City of Palm Desert Staff Report
Meeting Date: November 12, 2026
Prepared By: Cesar Lopez, Senior Engineer
Department: Development Services
Subject: Release the Grading Faithful Performance Bond for Monterey Crossing located on the northeast corner of Dinah Shore Drive and Monterey Avenue Recommendation
Release the Grading Faithful Performance Bond in the amount of $55,759.80.
Background
On May 11, 2017, the City Council adopted the following: Ordinance No. 1323 approving the Monterey Crossing Specific Plan and adopting a Mitigated Negative Declaration for the development of a development of 73,200 square feet of commercial space and a hotel use (Monterey Crossing Project) on 18 acres of vacant land located at the northeast corner of Monterey Avenue and Dinah Shore Drive; Resolution No. 2017-38, approving a precise plan and a conditional use permit for the Monterey Crossing Specific Plan; and Resolution No. 2017-39 approving tentative parcel map 37157 to subdivide 18 acres in eleven parcels for the Monterey Crossing Specific Plan.
On April 18, 2022, the Public Works Department verified the completion of offsite improvement obligations for Parcel Map No. 37157, as stated in the conditions of approval of Resolution No. 2017-39, including the following: traffic signal modification, curb and gutter installation, and a median modification. A Record Drawing of the improvements is on file in the Development Services Department.
On May 12, 2022, the City Council accepted the offsite improvements and released the Faithful Performance Bond and Labor and Materials Bonds submitted by Monterey 2.0 LLC in the amounts of $219,684.73 for Faithful Performance and $109,842.36 for Labor and Materials, respectively. Pursuant to the Palm Desert Municipal Code Section26.28.140, the city accepted a Maintenance Bond for a one-year period after completion of improvements in the amount of $21,968.47.
On October 27, 2026, the Public Works Department verified the completion of grading associated with permit number RG24-0008 , including rough grading and storm drain improvements on phase 2A. The City accepted a Grading Faithful Performance Bond, submitted by Monterey 2.0 LLC, in the amount of $55,759.80 prior to the grading permit issuance.
Staff recommends that the City Council authorize the release of the Grading Faithful Performance Bond.
615
Environmental Review
This action proposes the release of the Grading Faithful Performance Bond for the Monterey Crossing Project. The City Council previously approved the Monterey Crossing Specific Plan and adopted a Mitigated Negative Declaration through Ordinance No. 1323, adopted June 8, 2017. The bond releases do not authorize additional construction, modify the approved project, or alter applicable mitigation requirements. No substantial changes to the project or its circumstances, or new information of substantial importance, have been identified that would trigger subsequent environmental review under CEQA Guidelines Section 15162. Accordingly, no further environmental documentation is required for the proposed bond releases.
Legal Review
This report has been reviewed by the City Attorney’s Office.
Financial Impact
There is no fiscal impact associated with this action.
Attachments
1. Vicinity Map
2. Grading Faithful Performance Bond
616
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☒ Yes
☐ No
If yes, identify the project site: See Vicinity Map, 18 acres of vacant land located at the northeast corner of Monterey Avenue and Dinah Shore Drive Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☒ Yes
☐ No
If yes, identify the party: Monterey 2.0 LLC
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 617
618
Vicinity Map Project N
619
620
621
622
623
624
625
626
627
628
City of Palm Desert Staff Report
Meeting Date: November 12, 2026
Prepared By: Francisco Torres, Public Works Superintendent Department: Public Works
Subject: Approve Change Order No. 2 to Maintenance Service Agreement C45050 with Horizon Professional Landscape, Inc., for Landscape Maintenance Area 6 Recommendation
1. Approve Change Order No. 2 to Contract No. C45050 with Horizon Professional Landscape, Inc., of Coachella, CA, to add an additional maintenance area and increase the annual contract amount to $196,728, subject to CPI increases.
2. Authorize the City Attorney to make necessary non-monetary changes to the amendments.
3. Authorize the City Manager to execute the change order, the final one-year extension in the annual amount of $196,728, and any other documents, changes, or amendments necessary to effectuate this action.
4. Recommend that the City Council find that, pursuant to the California Environmental Quality Act (CEQA) and the State CEQA Guidelines, the proposed actions are categorically exempt from CEQA under State CEQA Guidelines Sections 15301 and 15304.
Executive Summary
On April 13, 2023, City Council awarded a three-year contract to Horizon Professional Landscape, Inc. (Horizon) to maintain Landscape Maintenance Area No. 6 (LMA 6). MA 6 includes landscaped areas throughout and surrounding Desert Willow Golf Resort, including roundabout planters, medians, internal parkways and roadways, perimeter landscaping, and the overflow parking lot near Country Club Drive and Desert Willow Drive.
The contract has since been revised to include new areas and adjust compensation for CPI increases. Most recently, on August 20, 2026, the contract was extended for an additional one-year term, and a CPI increase was approved.
Following completion of the Desert Willow Parking Lot E construction project, additional landscape maintenance services will be required once the landscape establishment period concludes. Horizon provided a quote for the ongoing monthly maintenance of the newly landscaped areas. Therefore, staff recommends approval of Change Order 2 to incorporate the additional maintenance services into the existing agreement and increase the annual contract amount by $23,520, from $173,208 to $196,728.
629
Background
The City of Palm Desert (City) contracts with private landscape maintenance contractors to provide routine maintenance services for its Landscape Maintenance Areas (LMAs), including landscape medians, parkways, right-of-way, and other public landscaped areas.
LMA 6 encompasses several landscaped areas throughout and surrounding the Desert Willow Golf Resort. This includes the roundabout planters and medians located along Desert Willow Golf Resort, as well as the landscaped overflow parking lot near the intersection of Country Club Drive and Desert Willow Drive. It also includes native plantings along internal parkways and roadways, as well as landscaped perimeter areas.
On April 13, 2023, the City Council approved a three-year Maintenance Services Agreement with Horizon for Landscape Maintenance Area 6. At the same meeting, extra work and services were authorized in an annual amount not to exceed $70,000. On June 27, 2024, Change Order No. 1 increased the contract amount to $163,296 to include maintenance for the new Desert Willow parking lot. Subsequently, the City Council approved Amendments No. 1 and 2 to accommodate Consumer Price Index (CPI) increases, bringing the total annual contract amount to $173,208.
Analysis
Construction of Desert Willow Parking Lot E has been completed, and the landscaped areas are currently maintained under the project's establishment and warranty period through December 31, 2026.
Beginning January 1, 2027, the City will assume responsibility for ongoing maintenance of these areas. As the existing LMA 6 contractor, Horizon submitted a proposal of $1,960 per month, or $23,520 annually, to incorporate Parking Lot E into its maintenance responsibilities.
The proposed change order will allow the City to maintain the newly landscaped areas under the existing agreement, ensuring consistency with established maintenance standards and continuity of service.
The following table summarizes the contract's historical adjustments and proposed increase:
Item Monthly Cost Annual Cost
Yr 1 - Original Contract $10,648 $127,776
Change Order No. 1 (New Area) $2,640 $31,680
Change Order No. 1 (CPI Adjustment) $320 $3,840
Yr 2 - Revised Contract Amount $13,608 $163,296
Amendment No. 1 (CPI 2.9%) $392 $4,704
Yr 3 - Revised Contract Amount $14,000 $168,000
Amendment 2 (CPI 3.1%) $434 $5,208
Yr 4 - Current Contract Amount $14,434 $173,208
Change Order No. 2 (New Area)* $1,960 $23,520
Yr 4 - Proposed Revised Contract Amount* $16,394 $196,728 *Current request
630
Approval of Change Order No. 2 will increase the annual contract amount to $196,728. The additional services will commence January 1, 2027, resulting in a prorated increase of $11,760 for the remainder of FY 2026/27.
Environmental Review
The proposed actions are categorically exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines sections 15301 (Existing Facilities) and 15304 (Minor Alterations to Land). Approval of the change order and contract extension provide for routine maintenance of existing landscaped areas within Landscape Maintenance Area 6, including the completed Desert Willow Parking Lot E landscaping, with no expansion of existing use. Section 15301(h) specifically includes maintenance of existing landscaping. Minor landscape improvements, including new or replacement planting within existing landscaped areas, are also exempt under section 15304(b). Furthermore, none of work will involve removal of healthy, mature, scenic trees. None of the applicable exceptions to categorical exemptions under State CEQA Guidelines section 15300.2 applies. Therefore, no further environmental review is required under CEQA.
Legal Review
This report has been reviewed by the City Attorney’s Office.
Financial Impact
Sufficient funding is included in the approved FY 2026-27 Financial Plan in the various Public Works Department operations budgets to cover the requested adjustments; therefore, there is no additional financial impact to the General Fund with this action.
Approval of Change Order No. 2 will increase the annual contract amount by $23,520, from $173,208 to $196,728. Because the additional maintenance services will begin January 1, 2027, the financial impact for FY 2026/27 is limited to six months, or $11,760.
The table below outlines the Fiscal Year 2026/27 budget and contract amount for LMA 6:
Accounts / Description FY 26/27
Budget
FY 26/27
Expenses
Balance
4414195-4332000 $250,000
1104614-4337001 $30,000
C45050 LMA 6 – $173,208
CO 2 – Prorated Amount $11,760
Extra Work $70,000
Totals $280,000 $254,968 $25,032
The proposed adjustment can be accommodated within the existing approved budget; therefore, no additional appropriation or General Fund contribution is required for FY 2026/27.
Funding for subsequent fiscal years, including any applicable CPI adjustments, will be subject to approval through the City's annual budget process.
631
Attachments
1. C45050 Change Order 2 Horizon Professional Landscape - LMA 6
2. LMA 6 Map
632
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☐ Yes
☒ No
If yes, identify the project site: Desert Willow Parking Lot E and existing Landscape Maintenance Area 6, as shown in Attachment 2. This action concerns routine maintenance of existing landscaping; no new construction, landscape redesign, or change in site use is proposed.
Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☒ Yes
☐ No
If yes, identify the party: Horizon Professional Landscape, Inc.
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 633
634
CITY OF PALM DESERT
CONTRACT CHANGE ORDER
Justification:
YES NO
Description of Changes Decrease
In Contract Price
Increase
In Contract Price
Totals:
Net Change in Contract Price:
Original Contract Amount: +
Contingency: +
Total Budget Amount:
Less: Expend. / Encumb. To Date: -
Less: This Change Order Amount: -
Remaining for Project:
Contingency: +
Less: Prior Change Order(s): -
Less: This Change Order: -
Remaining of Contingency:
__________________________________________________________ dollars and ___/100 (___________) Revised Contract Total: ___________________________
Contractor shall construct, furnish all supervision, labor, services, equipment, and materials, and perform all work necessary or required to fully complete the changes to the Contract described in this Change Order for the amount agreed upon between the Contractor and the City of Palm Desert (“City”).
Contract Purpose:
Contractor Name:
Contract No / P.O. #:
Change Order No.:
Contingency:
Account No.:
Project No.:
Vendor No.:
YES NO
Project Manager:
This Change Order is hereby entered into on:
C45050 26272838 2
✔
4414195-433200 MLS00012 V0008445 Landscape Maintenance Area 6 Horizon Professional Landscape Francisco Torres November 12, 2026 Desert Willow Lot E Landscape Maintenance $ 23,520.00 $ 0.00 $ 23,520.00 $ 23,520.00 $ 23,520.00 $ 23,520.00 Additional landscape maintenance at Desert Willow Lot E parking lot. $ 127,776.00 $ 0.00 $ 127,776.00 $ 0.00 $ 173,208.00 -$ 68,952.00 $ 45,432.00 -$ 68,952.00 The amount of the contract will be increased by the sum of: Twenty-Three Thousand, Five Hundred and Twenty 00 $ 23,520.00 $ 196,728.00 Rev 04-26
635
Continued from Front
Contract No. _________ Contract Change Order No. ___
Contract Time Extension: __________________________
Contractor accepts the terms and conditions stated above as full and final settlement of any and all claims arising out of or related to the subject of this Change Order and acknowledges that the compensation (time and cost) set forth herein comprises the total compensation due for the work or change defined in the Change Order, including all impact on any unchanged work. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the City from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. The adjustments to the Contract Price and Contract Time in this Change Order constitute the entire compensation and/or adjustment thereto due to Contractor, including but not limited to all direct, indirect, consequential, profit, labor, equipment, tools, idle time, incidentals, and overhead (field and home office) costs, due to Contractor arising out of or related to the change in the work covered by this Change Order. The Contractor hereby releases and agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any further claim or request for equitable adjustment of any type, for any reasonably foreseeable cause that shall arise out of, or as a result of, this Change Order and/or its impact on the remainder of the work under the Contract. This Change Order will become a supplement to the Contract and all provisions will apply hereto.
1. REQUESTED BY: ______________________
Department Director 2. ACCEPTED BY: ______________________Contractor
3. CERTIFIED FUNDS
AVAILABLE
______________________
Deputy Finance Director 4. APPROVED BY: ______________________ City Manager
NOTE: No payments will be made prior
to City Manager or Council approval
QC: _____
C45050 2
N/A
Rev 04-26
636
Portola Ave
Portola
Ave
Portola
Ave
Frank Sinatra Dr
Shepher
Willow
Rdg
Desert Willow
Portola Ave Portola Ave
College
D
Covington Dr
Market Pl
Desert Falls Dr
Frank Sinatra Dr
Frank Sinatra Dr
Augusta Dr
Taylor Ave
Cook
Cook St Cook St
Palm Desert
Center
Market Pl
Desert Falls
Wil low Rdg
Cook St
Country Club Dr
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community
Date: 2026
I
VICINITY MAP
LMA 6
Desert Willow Parking Lot E
637
638
City of Palm Desert Staff Report
Meeting Date: November 12, 2026
Prepared By: Monique Lomeli, Senior Deputy Clerk
Department: City Clerk’s Office
Subject: Ratification of Letter of Supporting SunLine Transit Agency’s Autonomous Vehicle Transit Feasibility Study Grant Application
Recommendation
Ratify the issuance of the October 5, 2026, letter supporting SunLine Transit Agency’s application for a Fiscal Year 2027–28 Sustainable Transportation Planning Grant to conduct an Autonomous Vehicle Transit Feasibility Study.
Analysis
On October 5, 2026, the City issued a letter supporting SunLine Transit Agency’s application for a Fiscal Year 2027–28 Sustainable Transportation Planning Grant to conduct an Autonomous Vehicle Transit Feasibility Study.
The study would evaluate potential service areas, safety, accessibility, regulatory requirements, costs, and funding opportunities to determine the feasibility of autonomous vehicle transit within SunLine’s service area.
The City’s support is limited to the planning effort and does not commit the City to implementing autonomous vehicle services. Ratification would formally affirm the City’s previously expressed support.
In accordance with Resolution No. 2025-020, Mayor Trubee and Mayor Pro Tem Pradetto reviewed and approved the issuance of the letters in advance of formal ratification by the City Council.
Environmental Review
The proposed action consists of ratifying the issuance of letters expressing the City’s support for SunLine Transit Agency’s federal grant applications and is not subject to the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15060(c)(2) and (3) because it will not result in a direct or reasonably foreseeable indirect physical change in the environment and is not a project as defined in CEQA Guidelines section 15378. Accordingly, no CEQA review is required.
Legal Review
This report has been reviewed by the City Attorney’s Office. 639
Financial Impact
There is no direct fiscal impact associated with ratification of the letter of support.
Attachments
1. Letter of Support – SunLine Feasibility Study Grant Application 640
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☐ Yes
☒ No
If yes, identify the project site:
Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☐ Yes
☒ No
If yes, identify the applicant(s), appellant(s), party, or participant(s):
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 641
642
CITY OF PALM DESERT
73-510 Fred Waring Drive
Palm Desert, California 92260
Tel: 760-346-0611
[email protected]
October 5, 2026
VIA E-MAIL
Caltrans
District 8
464 W. 4th Street 6th Floor, Mail Station 722
San Bernardino, CA 92401
Subject: Support for SunLine’s FY 2027-28 Sustainable Transportation Planning Grant Application for an Autonomous Vehicle Transit Feasibility Study Dear Caltrans Grant Review Committee:
On behalf of the City of Palm Desert, I am pleased to support SunLine Transit Agency’s application for a FY 2027-28 Sustainable Transportation Planning Grant to conduct an Autonomous Vehicle Transit Feasibility Study.
Palm Desert residents, employees, and visitors depend on regional transit to reach jobs, schools, healthcare, and other essential destinations. As the Coachella Valley grows, thoughtful planning is needed to determine where new transportation options could improve connections while meeting the needs of the communities they would serve.
SunLine’s proposed study will examine where autonomous vehicle transit service could be safely and effectively deployed within its service area. It will assess potential routes and service needs, accessibility, roadway and regulatory considerations, technology options, costs, and possible funding sources. An equity analysis will help identify where service gaps exist and whose needs should guide future decisions.
This is a planning grant, not a request to purchase vehicles or launch autonomous service. The study will give SunLine and its community partners the information needed to determine whether an autonomous transit project is appropriate, where it may be useful, and what steps would be required before any deployment.
The City of Palm Desert supports SunLine’s effort to evaluate these possibilities with safety, accessibility, and community needs at the forefront. We appreciate Caltrans’ consideration of this planning grant application.
Sincerely,
Mayor Evan Trubee
City of Palm Desert
643
644
City of Palm Desert Staff Report
Meeting Date: November 12, 2026
Prepared By: Monique Lomeli, Senior Deputy Clerk
Department: City Clerk’s Office
Subject: Ratification of Coalition Letter Supporting Expansion of FY 2028 Community Project Funding Accounts
Recommendation
Ratify the City of Palm Desert’s participation in a coalition letter supporting the restoration and expansion of eligible funding accounts under the federal Fiscal Year 2028 Community Project Funding (CPF) process.
Analysis
On November 2, 2026, the City of Palm Desert joined a coalition of local governments and public agencies in supporting expanded funding opportunities through the federal Fiscal Year 2028 Community Project Funding (CPF) process. The coalition letter requests restoration of four previously eligible funding accounts for postsecondary education, behavioral health, energy projects, and forestry, and addition of two accounts for firefighting equipment and parks and conservation projects.
Of particular interest to Palm Desert is the proposed inclusion of the Assistance to Firefighters Grants program, which could provide a dedicated funding opportunity for fire apparatus and equipment. The requested changes would broaden potential federal funding sources but do not guarantee funding or commit the City to a project or expenditure.
In accordance with Resolution No. 2025-020, Mayor Trubee and Mayor Pro Tem Pradetto reviewed and approved the City’s participation in the coalition letter in advance of formal ratification by the City Council.
Environmental Review
The proposed action is to ratify the City’s participation in a coalition letter advocating for expanded federal funding opportunities. The action is not subject to the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines sections 15060(c)(2) and (3), because it will not result in a direct or reasonably foreseeable indirect physical change in the environment and is not a project as defined in CEQA Guidelines section 15378. Accordingly, no CEQA review is required.
645
Financial Impact
There is no direct fiscal impact associated with ratification of the letter. Any future grant application, award, or related City expenditure would be considered separately through the applicable approval process.
Attachments
1. FY 28 CPF Funding Account Expansion Letter
646
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☐ Yes
☒ No
If yes, identify the project site:
Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☐ Yes
☒ No
If yes, identify the applicant(s), appellant(s), party, or participant(s):
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 647
648
[LETTERHEAD]
The Honorable Rosa DeLauro
Ranking Member
House Committee on Appropriations
1036 Longworth House Office Building
Washington, DC 20515
The Honorable
US House of Representatives
[### Rayburn/Longworth/Cannon House
Office Building]
Washington, DC 20515
RE: Continued Availability and Expansion of Funding Accounts for Community Project Funding in the FY28 Appropriations Process
Dear XXXX:
We write on behalf of the ## undersigned local governments and public agencies to express our strong support for expanding the funding accounts available through the Fiscal Year 2028 (FY28) Community Project Funding (CPF) process. Representing [cities, counties, community college districts, water districts, and transportation planning organizations], we value CPF as a way to address critical local needs and to work directly with our Members of Congress on projects that deliver tangible benefits to our communities. As Congress considers potential changes to the House appropriations process for FY28, we respectfully request the restoration of several previously eligible funding accounts, as well as the addition of new accounts to better address local governments’ diverse needs.
We recognize that the CPF process is competitive and that resources will remain limited.
However, demand is currently concentrated in a small number of oversubscribed accounts, particularly under the Commerce, Justice, Science (CJS) and Transportation, Housing and Urban Development (THUD) appropriations bills, forcing many worthwhile projects to compete within the same accounts. Expanding the range of eligible accounts would ease this pressure and allow requests to better align with the purposes of specific federal programs.
House Appropriators may also consider restoring eligibility for nonprofit community-based organizations (CBOs). Our agencies value these organizations and frequently partner with them, including by sub-granting federal funding. Without a corresponding expansion of eligible accounts, however, restoring CBO eligibility would intensify competition for an already limited pool of resources. A broader range of accounts would allow our agencies to support CBO projects while still pursuing funding for essential public infrastructure, facilities, and services.
Under the current framework, the narrow scope of eligible accounts often requires us to be creative in structuring requests, and some high-priority projects identified through local planning and community engagement cannot be accommodated at all. While we respect Congress's responsibility to set priorities and maintain program requirements, restoring and adding accounts would help the CPF process reflect the full range of responsibilities local public agencies carry. 649
Specifically, we request restoration of the following CPF funding accounts:
• Fund for the Improvement of Postsecondary Education (FIPSE) account under the Labor, Health and Human Services, Education, and Related Agencies (LHHS) appropriations bill.
• Substance Abuse and Mental Health Services Administration (SAMHSA) account under the LHHS appropriations bill.
• Department of Energy (DOE) Energy Projects account under the Energy and Water Development and Related Agencies appropriations bill.
• State, Private, and Tribal Forestry account under the Interior, Environment, and Related Agencies (I&E) appropriations bill.
We also request the addition of two new CPF funding accounts:
• Assistance to Firefighters Grants (AFG) program under the Homeland Security appropriations bill, giving local fire departments a dedicated avenue to fund apparatus and equipment amid rising costs and service demands, while easing pressure on HUD’s heavily subscribed Community Development Fund for Economic Development Initiatives. • Land and Water Conservation Fund account under the I&E appropriations bill, supporting parks, trails, and conservation work in both rural and urban communities.
Notably, the Senate continues to accept Congressionally Directed Spending requests through several of these accounts, including FIPSE, which helps community college districts and other institutions fund workforce development, instructional equipment, and expanded access to postsecondary education.
These changes would expand opportunities for local agencies to serve our shared constituents while preserving Congress's ability to set priorities and maintain oversight, and would help Members respond to the differing needs of urban, suburban, and rural districts. Thank you for your continued support of Community Project Funding and for your consideration of these recommendations.
Sincerely,
[SIGNATURES]
650
Below is a list of potentially eligible projects under each funding account, some of which would not be eligible at all under current rules, and others which could be added or funded at a higher level:
SAMHSA: Mobile Health Clinics
- Funding under this account could be used to support mobile clinics, bringing healthcare directly to our shared constituents and connecting them with organizations that can provide ongoing support.
FIPSE: AI Workforce Development Program
- Funding under this account could be used to help community colleges launch AI and emerging technology workforce training programs, including curriculum development, instructional equipment, and industry-recognized credentials that prepare students for in-demand jobs.
Land & Water Conservation: Trail Development Funding
- Funding under this account could be used to plan, build, and improve trails and connected park space, expanding public access to outdoor recreation and protecting natural areas in both rural and urban communities.
DOE Energy Projects: Disaster Mitigation and Preparation - Funding under this account could be used to retrofit existing community centers with backup generators, solar panels, and other means to preserve power, heating, and cooling Forestry: Fuel Breaks, Wildfire Mitigation
- Funding under this account could be used to create and maintain fuel breaks, reduce hazardous vegetation, and carry out other wildfire mitigation work that protects homes, critical infrastructure, and surrounding forest lands.
AFG: Fire apparatus and equipment purchases
- Funding under this account could be used to purchase or replace fire engines, ladder trucks, and other essential firefighting and emergency response equipment, helping local fire departments keep pace with growing service demands. 651
652
City of Palm Desert Staff Report
Meeting Date: November 12, 2026
Prepared By: Lucero Leyva, Senior Project Manager
Department: Capital Projects and Public Works
Subject: Amendment No. 3 to Contract No. C48050 with PBK Architects California, Inc., for Fire Station 33 and 71 Temporary Facility Design Services.
Recommendation
1. Approve Amendment No. 3 to Contract No. C48050 with PBK Architects California, Inc., in an amount not to exceed $223,000, for additional architectural and engineering design services associated with the conversion of the East County Training Center into a temporary fire station to accommodate personnel from Fire Stations 33 and 71 during their respective construction projects.
2. Receive an overview of the additional proposed improvements at the former Sheriff’s Substation and City Hall and provide direction to staff, as appropriate.
3. Authorize the City Attorney to make any necessary non-monetary changes to the amendment.
4. Authorize the City Manager or designee to execute this amendment and any other documents necessary to effectuate the actions taken herewith, in accordance with Palm Desert Municipal Code Section 3.30.170(B).
Executive Summary
Staff recommend that the City Council approve Amendment No. 3 to Contract No. C48050 with PBK Architects California, Inc., in an amount not to exceed $223,000, for additional architectural and engineering design services to facilitate the conversion of the East County Training Center into a temporary fire station. The facility will accommodate fire personnel during the renovation of Fire Station 33 and reconstruction of Fire Station 71, ensuring continuity of emergency response services while minimizing costs by eliminating the need for two separate temporary facilities.
Staff also wishes to apprise the City Council of additional upcoming capital improvement projects planned for the East County Training Center building. These projects are provided for informational purposes only and are separate from, and not included in, the scope or funding of the proposed amendment.
Background
On July 11, 2024, the City Council approved a contract with PBK Architects California, Inc., to provide architectural and engineering design services for the renovation of Fire Station No. 33 (Project No. CFA00017) and reconstruction of Fire Station No. 71 (Project No. CFA00019). On August 20, 2026, the City Council authorized the use of the East County Training Center at the 653
Civic Center campus as a temporary fire station during construction of both projects. The facility is anticipated to become available in December 2026 and will require improvements to accommodate fire personnel and operational needs. Staff is therefore requesting approval of Amendment No. 3 in the amount of $223,000 for additional architectural and engineering design services associated with these improvements.
In addition to the improvements necessary to convert the facility into a temporary fire station, the City is planning several other capital improvement projects at the East County Training Center building. While some of these improvements are funded through existing capital project budgets, others will require additional appropriations.
Analysis
East County Training Center – Temporary Fire Station (Amendment No.3) On July 11, 2024, the City Council approved a contract with PBK Architects California, Inc. in the amount of $1,397,000 for architectural and engineering services associated with Fire Stations 33 and 71. The contract has since been amended as follows:
Amendment No. 1 increased the contract amount by $63,655 for to provide additional traffic signal design services for Fire Station 71 and additional plan review coordination and revisions for Fire Stations 33 and 71 to address agency comments and approval requirements.
Amendment No. 2 increased the contract amount by $32,430 for to provide additional surveying services associated with Coachella Valley Water District (CVWD) easements and update the construction plans to comply with the 2025 California Building Code.
The current contract amount is $1,493,085. The original agreement did not include design services for a temporary fire station. Proposed Amendment No. 3 would add $223,000 for the architectural and engineering services necessary to convert portions of the East County Training Center into a temporary fire station during construction of Fire Stations 33 and 71.
Approval of the amendment would result in a revised contract amount of $1,716,085.
The proposed scope of work includes:
Conversion of existing office spaces into sleeping quarters for fire personnel. Modifications to kitchen, laundry, restroom, and other support facilities. Design of covered apparatus parking structures and associated site improvements. Electrical, mechanical, and plumbing modifications, including electrical hookups for emergency vehicles.
Preparation of construction documents, permitting assistance, bidding support, and construction administration.
Additional details regarding the proposed scope of services are included in the attached proposal from PBK Architects California, Inc.
Additional Improvements – East County Training Center and City Hall 654
In addition to the temporary fire station, the City is evaluating improvements to existing municipal facilities to enhance emergency operations and public services. These improvements include:
Emergency Operations Center (EOC): The City is evaluating improvements to the basement of the East County Training Center to establish an EOC in that location. The final scope has not yet been determined. Additional design development and confirmation of operational requirements will be necessary to establish a comprehensive scope and more detailed cost estimates.
Citizens on Patrol (COPS) and Sheriff Substation Offices: The Facilities Division has obtained multiple bids estimating the proposed improvements at approximately $30,000. The scope includes interior painting, carpet replacement, and modifications to existing entrances to establish a separate area for the COPS program and a Sheriff’s Substation, including administrative workspace for Sheriff’s personnel. This area will have no direct access to the temporary fire station facilities. City Hall: Administrative Lobby Renovations: Proposed improvements include new tile, new carpet, interior paint, American Disability Act (ADA) upgrades to the restrooms, and new case work. Additionally, minor roof repairs throughout the building. The final scope and associated costs are still being evaluated, but estimated costs are between $500,000 and $650,000
These improvements are in various stages of planning and design and are presented to provide the City Council with an overview of ongoing and anticipated capital investments, as well as to seek Council direction regarding the proposed improvements. The identified projects are not exhaustive and are separate from, and outside the scope of, the proposed contract amendment.
Staff will continue to evaluate project scopes, costs, schedules, and priorities, taking into consideration life safety, emergency needs, and critical operational requirements. As projects advance, staff will return to the City Council, as necessary, to seek approval of design and construction contracts.
Environmental Review
The proposed action is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines section 15301 (Class 1, Existing Facilities). The Class 1 exemption applies to the minor alteration of existing public structures that involves a negligible expansion of use. The project consists of the conversion of the East County Training Center at the Civic Center campus as a temporary fire station during construction during the renovation of Fire Station 33 and reconstruction of Fire Station 71. The modifications associated with the conversion of the existing East County Training Center will only result in a negligible expansion of use. Therefore, the project falls within the Class 1 exemption.
Furthermore, the City has determined that none of the exceptions to the categorical exemption set forth in CEQA Guidelines section 15300.2 applies. Therefore, no further environmental review is required.
655
Legal Review
This report has been reviewed by the City Attorney’s Office.
Financial Impact
Funds for Amendment 3 are available in Account No. 2304220-4400200 as part of the approved budget for the Fire Station 33 and Fire Station 71 projects. Following approval of the $223,000 amendment, approximately $23.4 million will remain in the authorized project budget. No additional appropriation is requested, and there is no Genal Fund impact.
Fire Stations 33 & 71:
Authorized Budgets
Date
Authorized
Fire Tax
Fund 230
FY 2022-23 Original Budget 7/1/2022 28,000
FY 2023-24 Appropriation 7/1/2023 93,500
FY 2024-25 Appropriation 7/1/2024 976,803
FY 2025-26 Appropriation 7/1/2025 3,000,000
FY 2026-27 Appropriation 7/1/2026 24,620,000
Total Authorized Budget to Date 28,718,303
Less: Authorized Expenditures
Date
Authorized
Fire Tax
Fund 230
Building Assessments 7/26/2023 68,000
Constructability Review 7/12/2023 109,355
Construction Management Svcs: 8/20/2026 3,271,210
Various Fees: Permits, Staff Time, Etc. 70,711
Architectural Design Svcs: 7/1/2024 -
PBK Architects California, Inc. (C48050) 1,397,000
Amendment No. 1 63,655
Amendment No. 2 32,430
Remaining Contingency 43,616
Total Authorized Expenditures to Date 5,055,976
PBK Architects California, Inc., Amendment No. 3: 11/12/2026 *Temporary Fire Station Design Services 223,000
Remaining Project Budget Available 23,439,327
*This request
Attachments
1. Proposed Contract Amendment No. 3
2. Architect’s Proposal for Temp. Fire Station Facility Improvements
3. Vicinity Map
656
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☒ Yes
☐ No
If yes, identify the project site: 73520 Fred Waring Drive, Palm Desert, CA Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☒ Yes
☐ No
If yes, identify the party: PBK Architects California, Inc.
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 657
658
Contract No. C48050
1 Rev 09-25
72500.00001\44340560.1
AMENDMENT NO. 3 TO THE PROFESSIONAL SERVICES AGREEMENT
BY AND BETWEEN THE CITY OF PALM DESERT AND
PBK ARCHITECTS CALIFORNIA, INC.
1. Parties and Date.
This Amendment No. 3 (“Amendment No. 3”) to the Professional Services Agreement, Contract No. C48050, is made and entered into on November 12, 2026, by and between the City of Palm Desert, a municipal corporation organized under the laws of the State of California with its principal place of business at 73-510 Fred Waring Drive, Palm Desert, California, 92260-2578 (“City”) and PBK Architects California, Inc., a Corporation, with its principal place of business at 10760 4th Street, Suite 200, Rancho Cucamonga, CA 91730 (“Consultant”). City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties.”
1.1 City Council Approval. On November 12, 2026, City Council approved the award of this Amendment No. 3 to the Consultant named above.
2. Recitals.
2.1 Agreement. The City and PBK Architects California, Inc., entered into a Professional Services Agreement (“Agreement”) on July 11, 2024, for the purpose of retaining the services of PBK Architects California, Inc., for Architectural Design Services of FS 33 and FS 71 Project CFA00017 and CFA00019. (“Project”).
2.2 Background. The parties previously entered into Amendment No. 1, on January 28, 2026, for the purpose of expanding the scope of services, and increasing compensation.
2.3 Background. The parties previously entered into Amendment No. 2, on October 26, 2026, for the purpose of expanding the scope of services, and increasing compensation.
2.4 Amendment Authority. This Amendment No. 3 is authorized pursuant to Section 3.6.14 of the Agreement.
2.5 The purpose of this Amendment No. 3 is to expand the scope of services and increase compensation.
3. Terms. The Agreement is hereby amended as follows:
Exhibit “B-3” Exhibit “B-3” is hereby added to the contract record, attached hereto and incorporated herein by reference.
659
Contract No. C48050
2 Rev 09-25
72500.00001\44340560.1
Section 3.1.1 General Scope of Services. Consultant promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the services necessary for the Project (“Services”). The Services are more particularly described in Exhibit “A” in original agreement, Exhibit “B-1” and Exhibit “B-2” in Amendment No. 2, and Exhibit “B-3” attached hereto and
incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits and all applicable local, state, and federal laws, rules, and regulations.
Section 3.3.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreements at the rates set forth in Exhibit “A” in original agreement, Exhibit “B-1” and Exhibit “B-2” in Amendment No. 2, and Exhibit “B-3” attached hereto and incorporated herein by reference The total compensation shall not exceed ONE MILLION SEVEN HUNDRED SIXTEEN THOUSAND EIGHTY-FIVE AND 00/100 DOLLARS
($1,716,085.00) without written approval of the City Council or City Manager, as applicable.
3.1 Continuing Effect of Agreement. Except as amended by this Amendment No. 3, all other provisions of the Agreement remain in full force and effect and shall govern the actions of the Parties under this Amendment No. 3. From and after the date of this Amendment No. 3, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement as amended by this Amendment No. 3.
3.2 Adequate Consideration. The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No. 3.
3.3 Severability. If any portion of this Amendment No. 3 is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.
[SIGNATURES ON FOLLOWING PAGE]
660
Contract No. C48050
3 Rev 09-25
72500.00001\44340560.1
SIGNATURE PAGE FOR AMENDMENT NO. 3
TO PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF PALM DESERT AND PBK ARCHITECTS CALIFORNIA, INC.
CITY OF PALM DESERT
Chris Escobedo
City Manager
Attest:
Anthony J. Mejia
City Clerk
Approved to form by:
____________________________
Isra Shah
City Attorney
PBK ARCHITECTS CALIFORNIA, INC., A
CORPORATION
____________________________
Jesse Miller
Managing Senior Principal, West Region
____________________________
Jessamyn Davis
Chief Financial Officer
Office Use:
Quality Check Insurance Review
City Clerk Contracts Initial Final
661
Contract No. C48050
EXHIBIT “B-3”
Rev 09-25
72500.00001\44340560.1
EXHIBIT B-3
ADDITIONAL SERVICES
662
Contract No. C48050
EXHIBIT “B-3”
Rev 09-25
72500.00001\44340560.1
663
Contract No. C48050
EXHIBIT “B-3”
Rev 09-25
72500.00001\44340560.1
664
10760 4th Street, Suite 200
Rancho Cucamonga, CA 91730
P. +1 909-987-0909
PBK.com
October 19, 2026
Lucero Leyva
Senior Project Manager
City of Palm Desert
73510 Fred Waring Drive
Palm Desert, CA 92260
Re: Request for Additional Services – Fire Station 33 and 71 Temporary Facility Palm Desert Fire Station No. 33 and 71
Project 240327.1D
Dear Lucero:
This request pertains to the City of Palm Desert’s request for PBK to provide design services for the Fire Station 33 and 71 Temporary Facility, as outlined in the email received on August 27, 2026.
It is our understanding that the City of Palm Desert intends to renovate the existing Sheriff’s Substation located at 73520 Fred Waring Drive, Palm Desert, CA 92260, and convert it into a temporary facility to accommodate both Fire Stations 33 and 71.
The proposed scope of work includes renovations limited to the building’s main floor, with no basement work, as well as minor site modifications. Site improvements are anticipated to include freestanding shade structures for the various apparatus to be housed at the facility, potential replacement of the existing generator, and the installation of shore power lines.
The estimated construction cost for this project is $1,500,000.00, which may or may not include design and construction management fees.
Basic Services:
• Architectural
• Structural Engineering
• Mechanical/Plumbing Engineering
• Electrical Engineering
Phase of Service:
• Schematic Design: (10%)
• Design Development (15%)
• Construction Documents (40%)
• Agency Review / Approval (5%)
• Bidding / Award (5%)
• Construction Administration: (25%)
665
Preliminary Schedule:
• Schematic Design: (1 month)
• Design Development (2 months)
• Construction Documents (3 months)
• Agency Review / Approval (3 months)
• Bidding / Award (2 months)
• Construction Administration (6 months)
• Closeout (1 month)
Assumptions & Exclusions:
• Items not specifically indicated in our scope of services are excluded. The following is a list of items which, while excluded, may be required. These services can be included, if requested, or once additional information is known:
A. Topographical Surveys.
B. Geotechnical Investigations/Reports.
C. Off-Site Street or Utility Improvements and/or potholing and location. Our fee assumes utilities are available at the project site.
D. Environmental Planning/California Environmental Quality Act (CEQA) Reports.
E. Stormwater Pollution Prevention Plan (SWPPP) Reports.
F. Traffic Signalization.
G. Abatement and Forensic Studies.
H. LEED documentation and submittal/certification.
I. Commissioning.
J. Energy Modeling.
K. Acoustical, Noise, or Traffic Studies.
L. Specialized Audio Visual (AV) consultants.
M. Multiple Bid Packages.
N. State/Local Agency Review/Approval/Permit Fees.
O. County, State, Title Company and Utility Purveyor Fees.
P. Title Reports, Legal Descriptions, and Reference Deeds.
Q. Third party cost estimates.
R. Professionally Constructed Building Models.
S. Construction Surveying/Staking.
T. Shoring Design.
U. Cone Penetration Testing.
V. Fire Flow Testing.
W. QSP/QSD services during construction.
X. Radius maps, mailing lists and public hearing signage.
Y. General Plan Amendment, Master Plan Amendment, Zone Change, Conditional Use Permit, Environmental Information Forms, or Variance Applications, Forms, and Maps.
Z. Foundation System: Our fee assumes typical spread footings in average soil conditions. Any other type of foundation system required as a result of poor soil conditions would not be considered within our scope of services.
Additional Services:
• If additional work is required beyond what is noted in our initial scope, PBK will provide services for these items under a separate proposal per the attached Billing Rates Schedule (Attachment ‘A’). No additional services will be provided without receiving written permission from the City.
666
Reimbursable Exepnses:
• Reimbursable expenses are not expected to exceed Ten Thousand Dollars ($10,000.00) and must be authorized by the City prior to procurement. Items required or requested by the City, Fire Department, or approving agency will be invoiced as reimbursable without markup on monthly intervals.
• Reimbursable expenses will be limited to the following:
A. Any Drawings or Specifications requested or required by a reviewing agency, the City, or Fire Department.
B. Bulk paper copy or printing.
C. Express or overnight mail/courier service.
D. Agency permit fees.
The City and the Fire Department will not incur any cost for travel, travel time, phone calls, faxes or incidental printing or copying.
CONSULTANT FEE
1. PBK (Architectural)
2. MIYAMOTO (Structural)
$ 124,000.00
40,000.00
3. PDS (Mechanical/Plumbing)
4. A&F (Electrical)
5. Reimbursables
33,000.00
16,000.00
10,000.00
TOTAL $ 223,000.00
Lucero, thank you for your consideration regarding this matter. I have attached a copy of the various consultant proposals and documents received by the City for your review. If you have any questions, or require further information, please do not hesitate to contact me at any time.
Sincerely,
__________________________
JAIME MORENO LUCERO LEYVA DATE
Associate Principal, Client Executive Senior Project Manager PBK Architects City of Palm Desert
JM:/240327x4-ltr
cc: Stephanie Quintero, PBK
Jasmine Quintero, PBK
Shelagh Heenan, PBK
Uriel Quevedo, PBK
Attachments: Memo From City Requesting Services
CAL FIRE & City Space Planning Diagram
Proposal from Miyamoto dated October 12, 2026
Proposal PDS dated October 1, 2026
Proposal A&F dated October 1, 2026
Billing Rates (Attachment ‘A’)
667
1 Moreno, Jaime
From: Lucero Leyva <[email protected]>
Sent: Thursday, August 27, 2026 2:44 PM
To: Moreno, Jaime
Cc: kirk.streets; tony.gatoff; rachael.highley
Subject: Fw: FS 33/71 Temporary Facility (Existing Sheriff's Substation Upgrades) CAL FIRE ITEMS & FLOOR PLAN
Follow Up Flag: Follow up
Flag Status: Flagged
External ([email protected])
Graymail Spam Phish More... FAQ Protection by INKY
Hi Jaime,
See responses below.
Sending the OneDrive link shortly.
Let me know if you have any further questions
Best,
Lucero Leyva
Senior Project Manager
City of Palm Desert
73510 Fred Waring Drive, Palm Desert, CA 92260
[email protected] | 760.776.6465 | www.palmdesert.gov From: Streets, Kirk <[email protected]>
Sent: Wednesday, August 26, 2026 7:55 AM
To: Lucero Leyva <[email protected]>
Cc: Gatoff, Tony <[email protected]>; Highley, Rachael <[email protected]> Subject: RE: FS 33/71 Temporary Facility (Existing Sheriff's Substation Upgrades) CAL FIRE ITEMS & FLOOR PLAN
Hi Lucero,
Responses for your consideration.
1. Building address? 73520 Fred Waring Drive, Palm Desert, CA 92260
2. Are as-builts available? Sending a link with what I was able to find. o Building
o Site utilities survey/POCs
o Other relevant documentation
668
2 3. How much of the building will be within the limits of work? Main floor only. No basement.
4. Is the temporary apparatus bay OFCI? It is possible, it ultimately depends on what option we pursue.
5. Schedule / Budget? Currently moving into Phase 4, shown below. Per 8/20/26 Council Agenda Report, construction is estimated to be $1.5M. Budget includes design and CM team involvement, shown below.
6. Design Team
o Architectural, Mechanical, Electrical, and Plumbing only? Yes. o Civil, Structural, and Landscape scope does not appear to be required. Please confirm. Need structural for confirmation of temporary shade structure. No landscaping required.
7. Will City provide a Hazardous and Abatement Report? No, improvements are not anticipated to require this report however we do have a May 2026 report I can add to the link.
8. Will any sitework be required for this temporary facility? If so, is a topographic survey/geotechnical available? Yes, site work is required. Temporary shade structure to be installed. No, topographical survey/geotechnical is not available.
669
3 Kirk Streets
Construction Manager III
Infrastructure & Capital Projects (I&CP)
Palm Desert, CA, USA | Mobile: 714.473.6361
accenture.com | I&CP: We are Hiring!
From: Moreno, Jaime <[email protected]>
Sent: Tuesday, August 25, 2026 3:28 PM
To: Lucero Leyva <[email protected]>
Cc: Streets, Kirk <[email protected]>; Gatoff, Tony <[email protected]>; Highley, Rachael <[email protected]>
Subject: [External] RE: FS 33/71 Temporary Facility (Existing Sheriff's Substation Upgrades) CAL FIRE ITEMS & FLOOR PLAN
WARNING: External email. Be vigilant with links, attachments, and requests.
Good afternoon, Lucero,
The design team is available to meet onsite on Tuesday, September 1st, after the OAC meeting at FS 102. Ideally, anytime between 10 AM and noon would work, but early afternoon would also work for the team. Let me know what works best for you.
In the meantime, here are a few items for consideration:
1. Building address?
2. Are as-builts available?
o Building
o Site utilities survey/POCs
o Other relevant documentation
3. How much of the building will be within the limits of work?
4. Is the temporary apparatus bay OFCI?
5. Schedule / Budget?
6. Design Team
o Architectural, Mechanical, Electrical, and Plumbing only? o Civil, Structural, and Landscape scope does not appear to be required. Please confirm.
7. Will City provide a Hazardous and Abatement Report?
8. Will any sitework be required for this temporary facility? If so, is a topographic survey/geotechnical available? Best regards,
Jaime Moreno
Associate Principal, Client Executive
Office: 909.987.0909
670
4 From: Streets, Kirk <[email protected]>
Sent: Thursday, August 20, 2026 11:05 AM
To: Moreno, Jaime <[email protected]>
Cc: Lucero Leyva <[email protected]>; Gatoff, Tony <[email protected]>; Highley, Rachael <[email protected]>
Subject: FS 33/71 Temporary Facility (Existing Sheriff's Substation Upgrades) CAL FIRE ITEMS & FLOOR PLAN
Jaime,
CAL FIRE requested items (below) and attached floor plans for FS 33/71 Temporary Facility located at current Sheriff Substation that is at Palm Desert Civic Center attached to City Hall.
Kirk Streets
Construction Manager III
Infrastructure & Capital Projects (I&CP)
Palm Desert, CA, USA | Mobile: 714.473.6361
accenture.com | I&CP: We are Hiring!
From: Wright, Cody@CALFIRE <[email protected]>
Sent: Tuesday, June 23, 2026 4:20 PM
To: Lucero Leyva <[email protected]>; Daniel Hurtado <[email protected]> Cc: Wright, Cody@CALFIRE <[email protected]>; Whitaker, Michael@CALFIRE <[email protected]>; Roberts, Greg@CALFIRE <[email protected]>; Smith, Isom@CALFIRE <[email protected]>
Subject: Fw: Temporary housing discussion items
Lucero,
Before we have our walk through with our executive staff on July 22nd, we thought it would be a good idea to have some quotes or ballpark figure for the below necessary items needed for the temporary housing. This way we can all be on the same page together about the full conception we are trying to accomplish. Please loop in anyone else that needs to be in on these conversations and let us know if you have any questions.
671
5 • Apparatus parking area - We would like to put in permeant shade structures over the parking area to full cover that area. Metal covering would be preferred for total coverage of fire apparatus and equipment.
• Has the generator issue been solved yet? Our walk-thru the city stated there were still talks with if the current generator would be staying or leaving. If it is removed, obviously a new one must be placed in service.
• Power issues needed - We will need specific shore power lines for the new Engine 33 which has two (one for power and one for A/C) and also the specific Medic Unit Shore power plug for each unit.. These would be identical to the current ones that are at Station 33 and Station 71 that the city already maintains.
• Will the city be providing an air compressor? Will be needed to ensure proper tire inflation, cleaning off equipment etc.
• In the kitchen area, additional food storage pantry space will be needed for up to 10 personnel and additional stove and 2 microwaves.
• Portable BBQ will be needed since both stations currently have built in BBQ's
• A designated space for minimum of 2 sets of washers and dryers. 3 would be preferred if we have 10 personnel. One set can be utilized for station supplies, towels, etc. These could be stacked to save space if necessary. City will need to help evaluate due to drainage and vent space needed since the temporary housing does not have any of these.
• What will be the plan for Personal Protective Gear lockers? Station 33 are the old style and will most likely not work. Station 71 has newer style but will not be enough for all personnel assigned.
Cody Wright
Division Chief
West Desert - D1
CAL FIRE/Riverside County Fire
77-933 Las Montanas Rd Ste 205
Palm Desert, CA 92211
(951) 355-4360 Cell
This message is for the designated recipient only and may contain privileged, proprietary, or otherwise confidential information. If you have received it in error, 672
6 please notify the sender immediately and delete the original. Any other use of the e-mail by you is prohibited. Where allowed by local law, electronic communications with Accenture and its affiliates, including e-mail and instant messaging (including content), may be scanned by our systems for the purposes of information security, AI-powered support capabilities, and assessment of internal compliance with Accenture policy. Your privacy is important to us. Accenture uses your personal data only in compliance with data protection laws. For further information on how Accenture processes your personal data, please see our privacy statement at https://www.accenture.com/us-en/privacy-policy. ______________________________________________________________________________________ www.accenture.com
673
674
1047 W. 6th Street, Ontario, CA 91762
Sacramento • San Francisco Bay Area • San Jose • Pleasanton • Los Angeles • Ontario • Orange County • San Diego• Reno • Las Vegas • Phoenix Washington, D.C.
Puerto Rico • Mexico • Costa Rica • Colombia • Haiti • Italy • Ukraine• Turkey •Uzbekistan Afghanistan • India • Nepal • Thailand Indonesia • Japan • New Zealand October 12, 2026
Mr. Jaime Moreno
PBK Architects
10760 4th Street, Suite 200
Rancho Cucamonga, CA 91730
[email protected]
Subject: Proposal for Structural Engineering Services related to Palm Desert FS Temp Facility
Palm Desert, CA
MI2628029
Dear Mr. Moreno:
Miyamoto International, Inc. (“Miyamoto”) has reviewed the subject project and is pleased to submit the following proposal to PBK Architects (“Client”) for professional services.
1. Scope and Services. Existing building to receive improvements to house temporary operations for the Palm Desert FS 33 and 71 during reconstruction of the facilities. Existing facility, is not to receive any structural modifications to the existing building, with no impact to the existing lateral system, and with inconsequential mass being added. The scope of services includes structural considerations of new, replacement roof top mechanical units, and the addition of three shade canopies in the existing parking lot. Shade canopies are approximately:
Two canopies 22’ x 102’
One Canopy 22’ x 82’
Total canopy square footage approx. 6300 sf.
Shade canopies to be of structural steel and metal deck, with cantilevered column design.
Our services are for the design of the structural shell (primary structural system) only, unless noted otherwise. They do not include the design of form work, shoring and other means and methods required for construction, or construction cost estimating. Our services do not include site visits unless specifically included in this proposal. Miyamoto may visit the Project, but unless otherwise specified, the purpose of the site visits is for Miyamoto to familiarize itself with the features of the site and the general aspects of construction in order to be able to respond to requests for information. Our services do not include any inspections related to, or control over, or supervision of, construction means, methods, techniques, sequences, or safety procedures.
Miyamoto will perform its services consistent with the professional skill and care ordinarily provided by structural engineers practicing in the same or similar locality under the same or similar circumstances.
No services such as architectural, geotechnical, civil, mechanical, electrical, or fire protection engineering are included, unless noted otherwise. If such services are required, licensed professionals qualified in these fields should be retained.
675
Palm Desert FS Temp Facility
MI2628029
October 12, 2026
2. Compensation. The basic fee for our services will be $40,000.00 and will be billed monthly as services are rendered.
In addition to the fee listed above, Miyamoto will bill you for any reimbursable expenses incurred by Miyamoto at a rate of 1.15 for traveling, lodging, printing, and delivery services.
3. Extra Services. If Miyamoto is asked to perform services which are outside the Scope of Work, or if you change the Scope of Work, including changes in size, quality, complexity, and schedule, then any work performed by Miyamoto as a result of such request or change will be billed to you either upon a mutually agreeable increase in the basic fee, or upon a time and materials basis. Miyamoto current hourly billing rates are as follows: Principal $325.00/hr; Associate Principal $275.00/hr; Senior Associate $240.00/hr; Associate Engineer $220.00/hr; Associate Designer $170.00/hr; Senior Project Engineer $180.00/hr; Senior Designer $160.00/hr; Project Engineer $160.00/hr; Staff Engineer $135.00/hr; and BIM Engineer / Designer $130.00/hr. The rates are subject to change without notice. Unless noted otherwise, extra services include but are not limited to the following: tenant improvement work; anchorage of MEP, fire sprinkler and other non-structural equipment; remediation of hazardous materials; exterior elements such as fountains, signs, light poles, flagpoles, site walls, and retaining walls; non-bearing exterior metal stud framing and other façade systems; non-bearing interior partitions; design-build stairs; pre-engineered joists and trusses; creating book specifications; value engineering services after completion of the permit submittal package; preparing documents for alternate bids; preparing documents for multiple building permit packages; responding to owner-retained peer review comments; attending additional meetings beyond the scope of the structural system; designing and detailing repairs for defective construction; and preparing record drawings during or after construction.
4. Charge for Late Payments. Invoices which are not paid within 30 days of the due date will bear a service charge of 1.5% per month, compounded, with charges accrued from the due date.
5. Limitation of Liability. Miyamoto’s liability to Client in the event of Miyamoto’s negligence, errors, omissions, strict liability, or breach of contract, with respect to the project or this agreement, shall not exceed the amount of insurance available under Miyamoto’s errors and omissions policy or policies which cover such events, or fee paid, whichever is less. Client agrees that it will not bring a lawsuit or claim against individual employees, officers, or directors of Miyamoto, and that Client’s sole remedies under this contract shall be against Miyamoto.
6. Use of Miyamoto Documents. The drawings, specifications, structural calculations, and other documents, including those in electronic form, produced by Miyamoto under this agreement are for use solely with respect to the Project. Miyamoto shall be deemed the owner of these documents and shall retain all common law, statutory and other reserved rights, including copyright. Upon the execution of this agreement, Miyamoto grants the Client a nonexclusive license to reproduce such Miyamoto documents for the purpose of constructing, maintaining or using the Project. Any termination of this agreement prior to completion of the Project, or any failure of Client to pay Miyamoto for Miyamoto’s services, shall terminate this license. Client shall not use the Miyamoto documents for any future additions or alterations to the Project without written permission of Miyamoto. Any unauthorized use of Miyamoto documents shall be at Client’s sole risk and without liability to Miyamoto.
7. Suspension; Termination.
676
Palm Desert FS Temp Facility
MI2628029
October 12, 2026
a. Suspension. If the project is suspended by Client (or the owner of the Project) for more than 30 days, Client shall compensate Miyamoto for all services performed by Miyamoto prior to such suspension. When the project is resumed, Miyamoto shall be compensated for expenses incurred in the interruption and resumption of Miyamoto’s services. Miyamoto’s fees for the remaining services shall be equitably adjusted. If the suspension continues for more than 90 days, Miyamoto may terminate this agreement by not less than 7 days’ notice. b. Miyamoto’s Right to Suspend Work upon Non-Payment. If any Miyamoto invoice is not paid within 60 days, Miyamoto shall have the right to suspend work on the project until payment on such invoice is received, and Miyamoto shall have no liability for any damage, cost, fine or penalty due to delay in the Project caused by such suspension.
c. Termination for Convenience. Client may, upon no less than 7 days’ written notice, terminate this agreement for the convenience of the Client without cause. d. Terminate for Cause. Either party may terminate this agreement on not less than 7 days’ written notice if the other party fails to perform its obligations under this agreement. e. Payment upon Termination. In the event of a Termination for Convenience or other termination not the fault of Miyamoto, Client shall pay Miyamoto for all services performed prior to termination, plus expenses incurred in demobilizing, plus a termination fee equal to Miyamoto’s anticipated but unrealized profit as of the date of termination.
677
Palm Desert FS Temp Facility
MI2628029
October 12, 2026
If you agree to the above, please send a signed copy of this agreement to Miyamoto International, Inc., as notice to proceed.
We appreciate the opportunity to work with you. The conditions of this proposal shall be applicable for 90 days from the date of this proposal, after which Miyamoto reserves the right to review and/or negotiate them with the Client.
Best regards,
Miyamoto International, Inc.
Rick Byrd S.E.
Principal
I, the Client, agree to the above terms:
Signature Date
Name Billing Contact Name
Title Billing Contact Email Address
Client Purchase Order or Project Number Billing Contact Phone Number RB/jg
Byrd S3350
678
Consulting Engineers
14451 Chambers Road, Suite 210, Tustin, CA 92780 Phone (949) 417-3903 Fax (949) 419-1393 October 1, 2026
PBK
8163 Rochester Avenue, Ste. 100
Rancho Cucamonga, CA 91730
Attention: Jaime Moreno
Associate Principal, Client Executive
Project: Palm Desert Temporary Facility FS 33 & 71
Subject: Proposal for Consulting Mechanical Engineering Services I am pleased to submit this proposal for the consulting mechanical services necessary for the design and construction for the above project.
Project Summary:
The project consists of existing building and shall provide engineering services for mechanical and plumbing design for TI for a temporary fire station located in Palm Desert, CA. Proposal is based on e-mail received on 09/30/2026. The project will be done in AutoCAD.
My understanding of the scope of the mechanical work for this project is as follows.
1. Air Conditioning: Provide HVAC system, which complies with the requirements of the California Mechanical Code.
2. Plumbing: Domestic hot and cold water, sanitary waste and vent, storm drains and natural gas piping systems which comply with the requirements of the California Plumbing Code.
All the plumbing system will stub out only five feet from the building.
3. Fire Sprinklers: Prepare design build specifications for fire sprinkler contractors shall modify and extend the existing automatic fire sprinkler system as required to provide protection for the new tenant development in accordance with the requirements of the California Building Code, Chapter 9, and NFPA 13.
4. Fire Hydrants: No services will be provided.
5. Landscape: No services will be provided.
For this scope of work, Pocock Design Solutions will provide the following services:
1. Design Development Phase:
a. Attend coordination meetings Design Team.
b. Size mechanical units; provide weights, electrical loads, and unit locations in building(s).
c. Determine main duct sizes and diffuser locations.
d. Determine fixture locations of plumbing.
e. Contact local authorities to determine requirements, develop code review for and special requirements.
f. Develop Title 24 Energy Analysis.
g. Assemble product literature on all products being specified or used. 679
Jaime Moreno October 1, 2026
PBK Page 2
14451 Chambers Road, Suite 210, Tustin, CA 92780 Phone (949) 417-3903 Fax (949) 419-1393 h. Mechanical design development drawings shall show actual size to scale of ducts, register, mechanical units, and equipment. Identity required chases and spaces for equipment. Provide mechanical section and schedules of equipment as needed. i. Plumbing design development drawings shall show fixture locations and major piping. Provide enlarged plumbing plans, schedules, and major details as needed.
2. Construction Document Phase:
a. Attend coordination meetings Design Team.
b. Coordinate work with other consultants.
c. Prepare heating/cooling calculations, domestic hot water calculation. d. Review HVAC system options with Owner and Architect to select the most appropriate system of this application.
e. Submit catalog cuts of the HVAC equipment, plumbing fixtures and equipment complete with sizes, weights and electrical requirements to the Owner and Architect for review and approval.
f. Prepare construction plans and final specifications. Provide a final opinion of the probable construction cost.
g. Provide title 24 documentation for the mechanical systems. h. Prepare typed final specifications utilizing the Master specification system based upon the CSI format to include appropriate print type and page layout.
3. Bidding Phase:
a. Provide addenda as required to clarify the plans and specifications. b. Review bid proposal.
4. Construction Administration Phase:
a. Provide two (2) job site visits and construction observation reports. b. Review the Contractor's submittals and shop drawings. c. Provide interpretations and clarifications of the plans and specifications. d. Produce record drawings from Contractor’s as-built drawings.
5. Exclusions:
a. LEED.
b. Commissioning.
c. Printing and delivery costs.
d. Professional cost estimates.
e. Exhaust Extraction.
The proposed fee for these services is Thirty-Three Thousand dollars ($33,000.00). The breakdown of this fee is as follows:
1. Design Development Document Phase 25% or $8,250.00
2. Construction Document Phase 50% or $16,500.00
3. Bidding Phase 5% or $1,650.00
4. Construction Administration Phase 20% or $6,600.00
Fees will be billed monthly for the percentage of the engineering services completed.
Additional services will be provided as requested and will be charged based on the following rates.
Additional site visits with reports during construction will be provided at the rate of $600.00 each.
Classification Billing Rate
Principal $230.00
680
Jaime Moreno October 1, 2026
PBK Page 3
14451 Chambers Road, Suite 210, Tustin, CA 92780 Phone (949) 417-3903 Fax (949) 419-1393 Engineer $200.00
Project Manager $190.00
Sr. Designer $165.00
Designer $145.00
Cad Drafting $105.00
Clerical $85.00
If you have any questions concerning the proposed scope of work, services, fees, and agreement, please call me. If this proposal and agreement are acceptable, please return one signed copy of each for our records.
Thank you for this opportunity to be of service. I look forward to working with you and your office on this project.
Very sincerely yours,
Pocock Design Solutions, Inc. Accepted for PBK
By: ................................
Date: ..............................
Tim Pocock
Principal
681
A&F ENGINEERING GROUP, INC.
CONSULTING ELECTRICAL ENGINEERS
9320 BASELINE RD. SUITE C, RANCHO CUCAMONGA, CA 91701, Tel (909) 941-3008, Fax (909) 941-8211 October 1, 2026
Mr. Jaime Moreno
PBK
10760 4th Street, Suite 200
Rancho Cucamonga, CA 91730
Re: Temporary Fire Station – City of Palm Desert
A & F Engineering Group, Inc. Proposal
Mr. Moreno,
Pursuant to your request, we are pleased to submit this proposal to furnish Electrical Engineering services for the aforementioned project.
The Scope of Work includes preparation of electrical construction documents for the following:
• Convert existing office space into a temporary fire station. • Addition of an App Bay structure in the parking lot.
• Use existing service and power distribution system to provide power to the Temp. station. • Use existing generator to provide emergency power to the Temp. station. • Provide separation of power between the Temp. station and the Community spaces in the building.
• Replace existing fluorescent light fixtures with LED fixture and dimming controls for T24 compliance.
• Power for HVAC and plumbing equipment.
• Coordination with the alerting system consultant to determine 120V. power requirements and rough-in for alerting system devices.
• Site distribution of power, lighting and signal systems to the App Bay structure. • Single line diagram and panel/load schedules.
• Title 24 Energy Compliance
A & F Engineering Group, Inc. services for this project will include but not limited to the following:
I. SERVICES TO BE PROVIDED:
1. Construction Document Phase
A. Attend coordination meeting/conference call with the Architect and other design team members.
B. Complete drawing package which shall include plans, diagrams and details necessary for obtaining a building permit in accordance with the authority having jurisdiction, including, but not limited to:
1) Site plan indicating points of connections to the App Bay structure and routing of underground duct banks.
2) Lighting plan indicating fixtures, fixture types, control device location and required circuiting for the tent structure.
3) Power plan indicating the location of equipment, devices, and required circuiting/cabling for the tent structure.
682
A&F ENGINEERING GROUP, INC.
9320 BASELINE RD. SUITE C, RANCHO CUCAMONGA, CA 91701, Tel (909) 941-3008 fax (909) 941-8211
Temp Fire Station
City of Palm Desert
4) Signal plan indicating the location of tel/data outlets, network cabling to tel/data outlets, conduit only for routing of all other low voltage/signal systems. 5) Egress and emergency lighting as required.
6) Single Line Diagram and panel/load schedules.
7) Interior and exterior Title 24 calculations and compliance forms.
C. Preparation of Specifications.
D. Coordinate with the work of the Architect and other design team members.
E. Submit plans in pdf format to the Architect for City Plan Check.
F. Incorporate City Plan Check corrections and submit a written response to the City Plan Check corrections.
G. Submit one pdf copy of the completed (100%) drawings and specifications, electronically signed, to the Architect for City plan approval.
2. Construction Support Phase
A. Interpret electrical documents during bidding and assist the Architect in the preparation of addenda.
B. Review Shop drawings and submittals by the Contractor.
C. Interpret contract documents for proper execution of work during construction.
D. Assist the Architect in the preparation of bulletins and Change Orders.
E. Final site visit and punch list.
3. Work Not Included
A. Power for EV capable spaces and EV charging stations.
B. PV power plant.
C. Fire alarm system design. The fire alarm system is a deferred approval item, development of fire alarm plans and submittal to the Fire Department for review and approval shall be the responsibility of the Fire Alarm system vendor/contractor.
D. Alerting system design.
E. Upgrade of the power utility service to the building. It is assumed the existing service has sufficient capacity to serve the project.
F. Upgrade of the emergency generator and transfer switch. It is assumed the existing generator has sufficient capacity to serve the project.
G. Delivery of plans to the City for plan check and associated plan check fees.
H. Structural details/calculations for supporting/anchoring of equipment.
I. Preparation of “Record” drawings from the contractor’s as-built mark-ups.
II. COMPENSATION
1. The Construction Documents Scope of Work for Electrical Engineering services will be provided based on a lump sum fixed fee of Sixteen Thousand ($16,000.00).
2. Services shall be invoiced monthly based upon the work completed. Payment is due within 30 days of invoice date
683
A&F ENGINEERING GROUP, INC.
9320 BASELINE RD. SUITE C, RANCHO CUCAMONGA, CA 91701, Tel (909) 941-3008 fax (909) 941-8211
Temp Fire Station
City of Palm Desert
3. Additional fees, based on the following hourly rates, shall apply for any and all revisions to the Scope of Work:
Principal $250.00
Engineer $210.00
Project Manager $180.00
Sr. Designer $150.00
Designer $120.00
CAD Drafting $ 90.00
Clerical $ 70.00
4. Reimbursable expenses are in addition to compensation and include expenses for overnight delivery services, couriers and printing. Reimbursable expenses will be invoiced at cost.
We are looking forward to working with your office on this project. Please contact our office if you have any questions or require additional information.
Sincerely,
Luis E. Flores
Principal
LEF:ms
ACCEPTED ________________________________________ DATE ________________ 684
PBK Architects, Inc.
Billing Rates
Attachment 'A'
California
Effective June 1,2025 - May 31, 2026
Senior Principal $ 400.00
Principal/Client Executive/Director (President/VP) $ 350.00 Senior Project Manager/Director $ 310.00
Project Manager $ 300.00
Senior Project Architect $ 275.00
Project Architect $ 260.00
Construction Services Manager $ 250.00
Construction Services Coordinator/Construction
Administrator $ 200.00
Production Staff (Job Captain, Asst. PM, Project
Coord., Design Coord., Associates, Tech. Designer) $ 180.00 Draftsman $ 180.00
Interior Designer $ 170.00
Designer $ 130.00
Administrative $ 120.00
Architecture
26 75
685
686
SAN PASCUAL AVE SAN PASCU
SA
N
PA
B
L
O
A
VE
SA
N
PA
B
L
O
A
VE
SAN PASCUAL AVE
FRED WARING DR
RANC
Copyright nearmap 2015
Date: 2026
Former Sheriff Substation
I
VICINITY MAP
73520 Fred Waring Dr
687
688
City of Palm Desert Staff Report
Meeting Date: November 12, 2026
Prepared By: Martin Alvarez, Director of Economic Development Department: Economic Development
Subject: Real Estate Option and Purchase and Sale Agreement with Kam Sang Company for Desert Willow Lot Pads C and D
Recommendation
1. Authorize the Executive Director of the Successor Agency to the Palm Desert Redevelopment Agency (SARDA) to execute the Real Estate Option and Purchase and Sale Agreement and Joint Escrow Instructions (PSA) with Kam Sang Company for Desert Willow Lot Pads C and D at the appraised fair market value of $3,870,000, subject to required approval by the Riverside Countywide Oversight Board and the California Department of Finance.
2. Authorize SARDA legal counsel to make non-substantive modifications necessary to finalize the documents and implement the Agreement.
Executive Summary
The proposed Agreement would grant Kam Sang Company a 24-month option to purchase approximately 34.11 acres at Desert Willow Golf Resort, known as Lot Pads C and D, for the appraised value of $3,870,000. The conceptual project includes 200 hotel rooms, 26 hotel villas, and related amenities (see attached Desert Willow Lot C and D Site Map and Conceptual Site Plan).
As part of the PSA, the developer would make an initial $100,000 deposit, credited toward the purchase price, allowing the developer to pursue project entitlement approvals before acquiring the property. The closing of escrow would require approval of all project entitlements, a Development Agreement with the City, proof of complete project financing, and executed construction contracts. The Agreement also requires approval from the Riverside County Oversight Board and the State Department of Finance prior to execution and enforceability.
Any proposed City financial participation would be evaluated separately and presented to City Council for consideration.
Background
SARDA owns Desert Willow Lot Pads C and D, comprising approximately 34.11 acres within Desert Willow Golf Resort. In 2024, the properties completed the State-required Surplus Land Act process and received clearance for disposition. The properties are designated Resort Commercial in the General Plan and zoned Planned Residential at five units per acre.
In September 2024, SARDA entered into a six-month Exclusive Negotiating Agreement with the Kam Sang Company to evaluate the potential of a resort hotel and villa project on Lot Pads 689
C and D. Extensions approved in April and October 2025 allowed additional time for due diligence, conceptual design modifications, financial analysis, and the evaluation of relocating the City-owned Mountain View Golf Course Hole No. 5, which bisects the properties.
The conceptual project includes 200 hotel rooms, 26 hotel villas, food and beverage outlets, retail, spa, and fitness facilities. The golf hole relocation concept has been reviewed by Hurdzan Architects, the original course designer; Kemper Sports Management; and City staff (see attached Mountain View Golf Course Hole No. 5 Concept/Relocation Plan). The buyer’s proposal for evaluation is conceptual and creates no vested entitlement or assurance of approval.
Analysis
The Agreement would allow the developer to complete due diligence and obtain project entitlement approvals before purchasing the property. Key terms are summarized below.
Term Proposed requirement
Property and
purchase
price
Approximately 34.11 acres for $3,870,000, based on the Urban Property Advisors appraisal (see attached). The final legal description and map must be completed before execution.
Initial option
term
24 months from the Effective Date, defined in the draft as the date of State Department of Finance approval.
Initial option
payment
$100,000 deposited into escrow within three business days of the Effective Date and credited toward the purchase price.
Entitlement
application
A complete application, including required CEQA environmental documents, within 180 days of the Effective Date.
Closing
conditions
Final entitlements and CEQA clearance beyond applicable appeal or challenge periods; necessary maps, construction drawings, and permits; an executed Development Agreement; complete project financing; and executed construction contracts. Closing is required within the initial term, subject to extension provisions.
Construction
milestones
Begin construction within 30 days after closing and complete the project within 24 months after construction begins.
Entitlement
extensions
Up to six additional months, with payments of $10,000 per month.
Closing
extensions
Up to six months: $100,000 per month for the first three months and $150,000 per month for the next three months. Additional option consideration is credited toward the purchase price.
The property comprises APNs 620-450-013, 620-450-014, 620-450-016, 620-450-018, and 620-450-020
690
Related City Actions
A separate Development Agreement would require City Council approval and address proposed City participation and project obligations. Matters requiring further evaluation include regional infrastructure improvements, relocation of Mountain View Golf Course Hole No. 5, and potential shared parking.
If the sale proceeds, a separate exchange would be considered involving approximately 5.2 acres of City-owned golf course land (Mountain View Hole No. 5) and an equal-sized portion along the eastern boundary of Lot D.
Environmental Review
Approval of the Option Agreement is not subject to CEQA pursuant to CEQA Guidelines sections 15060(c) because it will not result in a direct or reasonably foreseeable indirect physical change in the environment.
The proposed action is limited to granting a preliminary purchase option that allows the applicant to conduct due diligence and pursue environmental review and discretionary approvals before acquiring the property. The action does not authorize the underlying development or construction and will not itself result in a direct or reasonably foreseeable indirect physical change in the environment.
Consistent with CEQA Guidelines sections 15004(b)(4) and 15352, the Agreement does not commit the Successor Agency or City to approve or implement the proposed development or any particular project feature. Conveyance remains subject to applicable CEQA compliance and subsequent discretionary approvals.
Legal Review
SARDA legal counsel has reviewed the report and final Agreement.
Financial Impact
If escrow closes, the property sale would generate gross proceeds of $3,870,000 for SARDA.
The City’s estimated share of the sale proceeds as a taxing entity is 3%, or approximately $116,100.
The completed hotel of this scale could generate Transient Occupancy Tax and sales tax revenue for the City’s General Fund estimated at $3.5M/ year. As part of the project entitlements and a future development agreement, the City will evaluate future costs associated with the relocation of the City-owned golf hole, utility/infrastructure improvements, and shared parking opportunities. Any proposed City funding would require subsequent consideration and approval by the City Council.
Attachments
1. Real Estate Option and Purchase and Sale Agreement and Joint Escrow Instructions (PSA)
2. Desert Willow Lot Pads C and D Site Map
691
3. Hotel Conceptual Site Plan
4. Mountain View Golf Course Hole No. 5 Concept/Relocation Plan 692
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☒ Yes
☐ No
If yes, identify the project site: Desert Willow Lot Pads C and D, APNs 620-450-013, 620-450-014, 620-450-016, 620-450-018, and 620-450-020
Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☒ Yes
☐ No
If yes, identify the party: Kam Sang Company
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 693
694
-1-
REAL ESTATE OPTION AND PURCHASE AND SALE AGREEMENT
AND JOINT ESCROW INSTRUCTIONS
This Real Estate Option and Purchase and Sale Agreement and Joint Escrow Instructions (this “Agreement”), dated for reference purposes only as of November 12, 2026 (the “Effective Date”) is entered into by and between Kam Sang Company, a California corporation, or its permitted assignee pursuant to Section 24 (“Buyer”), and the SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY (“Seller”), for the purchase and sale of that certain real property consisting of approximately 34.11 acres located in the City of Palm Desert, County of Riverside (“County”), State of California, as legally described on Exhibit A attached hereto and identified on the map attached hereto as Exhibit A-1 (the “Option Property”).
As used herein the term “Option Property” shall include all of Seller’s right, title and interest in and to all entitlements, easements, mineral rights, oil and gas rights, water, water rights, air rights, development rights and privileges appurtenant thereto and all improvements located thereon, excepting any right, title or interest to any public rights of way or public easements.
The term “Seller” or “Successor Agency” or “Agency” in all cases herein refers to the Successor Agency to the Palm Desert Redevelopment Agency and the term “City” as used herein means the City of Palm Desert, a municipal corporation. The term “Effective Date” as used in this Agreement shall be the date of State Approval of this Agreement as set forth in Recital G.
R E C I T A L S
This Agreement is entered into with reference to the following facts:
A. Pursuant to AB X1 26 (which became effective at the end of June 2011), as modified by the California Supreme Court’s decision in California Redevelopment Association, et al. v. Ana Matosantos, et al. (53 Cal. 4th 231(2011)), the Palm Desert Redevelopment Agency (the “Redevelopment Agency”) was dissolved as of February 1, 2012 and the Agency was constituted to wind down the affairs of the former Redevelopment Agency; B. AB 1484 (which became effective at the end of June 2012) amended and supplemented AB X1 26 (AB X1 26 and AB 1484, together, being referred to below as the “RDA Dissolution Act”);
C. Pursuant to the RDA Dissolution Act, all assets, properties, contracts, leases, books and records, buildings, and equipment of the former Redevelopment Agency have been transferred to the control of the Agency;
D. Agency owns the fee interest in the Option Property; E. Buyer desires to obtain an option to purchase the Option Property; F. The Countywide Oversight Board of Riverside County has adopted or will adopt a resolution approving this Agreement (the “Oversight Board Approval”). Seller and Buyer agree that such approval by the Countywide Oversight Board of Riverside County is a condition to the execution and enforceability of this Agreement;
695
-2-
G. The State of California, Department of Finance (“DOF”) has approved or will approve this Agreement as required by the RDA Dissolution Act (the “State Approval”). Seller and Buyer agree that such approval by DOF is a condition to the execution and enforceability of this Agreement;
H. An appraisal dated September 30, 2026 was conducted for the Option Property by Urban Property Advisors and concluded that the fair market value for the Option Property is $3,870,000 (the “Appraisal”); and
I. Seller desires to grant an option to purchase the Option Property and Buyer desires to receive an option to purchase the Option Property on the terms and conditions set forth herein.
NOW, THEREFORE, the parties hereto agree as follows:
1 GRANT OF OPTION
A. Grant of Option. Seller hereby grants to Buyer an option (the “Option”) to purchase the Option Property on the terms and conditions specified in this Agreement.
B. Option Consideration.
(1.) As consideration for Seller entering into this Agreement and granting the Option, Buyer shall pay to Seller via deposit with Escrow Holder $100,000 which shall be non-refundable to Buyer (except as otherwise expressly provided herein) as the “Initial Option Consideration.” The Initial Option Consideration shall be deposited with and held by escrow holder within three (3) business days of the Effective Date. Failure to make any deposit or payment of the Initial Option Consideration required by this Section 1 on or before the date specified shall cause this Option to terminate. As used in this Agreement, the term “Option Consideration” includes the Initial Option Consideration and Additional Option Consideration (defined below). As additional consideration for the initial term of the Option, Buyer shall pay the Independent Consideration described in Section 2.D. below. (2.) If Buyer desires to extend the term of the Option as provided in Section 1.C, below, Buyer, prior to the expiration of the initial Option Term (defined and described in Section 1.C), shall (i) give written notice to Seller of Buyer’s election to extend the Option Term, and (ii) deposit with Escrow Holder (defined below) “Additional Option Consideration,” calculated based on either of the following:
(a.) If Buyer requires additional time in excess of the Option Term (defined and described in Section 1.C) to obtain Entitlements (defined and described in Section 12.F) from the Effective Date, Buyer may extend the Option Term at a rate of $10,000 per month, for up to six months total. All monthly extension payments made under this subsection shall be held by Escrow Holder and shall be disbursed only as provided in Section
1.B.
(b.) If Buyer requires more than twelve (12) months to close from the date of obtaining Entitlements (defined and described in Section 12.F), Buyer may extend the Option Term (defined and described in Section 1.C) by up to three (3) months at a rate of $100,000; or up to six (6) months at a rate of $150,000. Any desired extension under this 696
-3-
Subsection by Buyer in excess of six (6) months is subject to the additional payment at the City Manager’s discretion
(3.) Except as provided in Sections 19 and 22, below, all Option Consideration paid hereunder for the Option shall be nonrefundable. However, should Buyer fail to obtain Entitlements (defined and described in Section 12.F) within the Option Term (defined and described in Section 1.C), Buyer shall receive refund of the Initial Option Consideration and all monthly extension payments paid pursuant to Section 1.B.2(a). This Agreement constitutes irrevocable instructions to Escrow Holder that the Initial Option Consideration and any Additional Option Consideration, if applicable, is to be disbursed to Seller within forty-eight (48) hours of deposit thereof by Buyer with Escrow Holder.
(4.) The Initial Option Consideration and the Additional Option Consideration, if made, shall be applicable to the Purchase Price (defined below); provided, however, the Independent Consideration shall not be applied to the Purchase Price.
C. Option Term. The initial term of this Option shall expire at 5:00 p.m. on the twenty four-month anniversary of the Effective Date (“Option Term”). If this Option has not theretofore expired or been exercised, Buyer may extend the Option Term, pursuant to Section
1.B.2. The extension of the Option Term shall expire at 5:00 p.m. on the last day of the applicable extension deadline, unless such day is not a Business Day, in which case the extension period shall expire on the next Business Day. The Option Term, as extended, shall collectively be referred to herein as the Option Term. A “Business Day” shall mean Monday through Friday, except for holidays on which the Riverside County Recorder’s office is closed.
D. Permission To Enter. Seller hereby grants to Buyer, or its authorized agents, permission to enter upon the Option Property at all reasonable times from the Effective Date until the expiration of the Option Term, and if the Option is exercised, from and after such exercise until close of this transaction for the purpose of conducting due diligence, including making necessary or appropriate inspections and surveys. Buyer will give Seller at least two (2) Business Days written or oral notice before going on the Option Property. Subject to the qualifications and limitations set forth in Section 11, Buyer does hereby indemnify and hold harmless Seller, Seller’s heirs, successors, assigns, officers, employees, agents and representatives (collectively, the “Seller Parties”) free and harmless from and against any and all liability, loss, damages and costs and expenses, demands, causes of action, claims or judgments (collectively, “Liabilities”), arising from or that is in any way connected with Buyer’s inspections or non-permanent improvements involving entrance onto the Option Property pursuant to this Section 1D. If Buyer fails to acquire the Option Property due to Buyer’s default, this license will terminate upon the termination of Buyer’s right to purchase the Option Property. In such event, Buyer will remove or cause to be removed all of Buyer’s personal property, facilities, tools and equipment from the Option Property.
If Buyer does not remove all of Buyer’s personal property, facilities, tools, and equipment from the Option Property within ten (10) Business Days of the date that Buyer’s license terminates under this Section, Seller has the right to remove said personal property, facilities, tools and equipment from the Option Property. In the event Buyer fails to remove Buyer’s personal property, facilities, tools and equipment from the Option Property after entering the Option Property to perform due diligence, including to make necessary or appropriate inspections and surveys as specified in this 697
-4-
Section 1D, Buyer is responsible for all reasonable costs incurred by Seller in any such removal by Seller.
2 PURCHASE PRICE/ ESCROW/ INDEPENDENT CONSIDERATION
A. The purchase price for the Option Property shall be equal to the value of the Option Property under the Appraisal, Three Million Eight Hundred and Seventy Dollars (3,870,000) (the “Purchase Price”), to be paid all cash to Seller at Closing (defined below). The Option Consideration payable under this Agreement shall be credited against the Purchase Price.
B. Within two (2) Business Days of the mutual execution of this Agreement, Buyer shall deliver a copy of this Agreement to First American Title Insurance Company National Commercial Services Attn: Trent Thomas, National Commercial Escrow Officer (“Escrow Holder”) for the purpose of opening an escrow (the “Escrow”) for the implementation and consummation of the transaction contemplated by this Agreement. Title Services will be provided by First American Title Insurance Company National Commercial Services Attn: Trent Thomas, National Commercial Escrow Officer.
C. [Reserved.]
D. Within three (3) Business Days following the mutual execution and delivery of this Agreement to Escrow, Buyer shall pay directly to Seller outside of Escrow the amount of Two Hundred Dollars ($200.00) (the “Independent Consideration”). The Independent Consideration shall be non-refundable to Buyer as independent consideration for the rights and options extended to Buyer hereunder, including, without limitation, the Option granted under this Agreement and the right and option to terminate this Agreement as provided herein. Seller shall retain the Independent Consideration if Buyer elects to terminate or is deemed to have terminated this Agreement. The Independent Consideration shall not be applicable to the Purchase Price or treated as consideration given by Buyer for any purpose other than as provided herein. The parties agree that it is their intention that the amount of the Independent Consideration is bargained for and sufficient consideration, as such term is defined in Steiner v. Thexton, 48 Cal. 4th 411 (2010).
Buyer and Seller hereby acknowledge and confirm that they have had an opportunity to review this provision with their respective, independent counsel. 3 EXERCISE OF OPTION
A. Exercise. The Option shall be exercised, if at all, prior to the expiration of the Option Term. In order to exercise the Option and purchase the Option Property, Buyer must give written notice to Seller of election to exercise the Option in accordance herewith on or before the expiration of the Option Term (“Option Exercise”). If an expiration date or deadline would otherwise be a day which is not a Business Day, then the expiration date or deadline shall be the next Business Day.
B. Memorandum of Option. The parties shall immediately execute a memorandum or short form of this Agreement in customary form to be recorded in the Official Records of Riverside County within three (3) Business Days of the Effective Date.
C. Quitclaim Deed. Upon expiration or termination of this Option without the Option having been effectively exercised, Buyer agrees that it shall, within five (5) Business Days 698
-5-
execute and deliver to Seller a quitclaim deed to the Option Property in customary form. The provisions of this section shall survive the termination of this Agreement. 4 FAIR MARKET VALUE; NO SUBSIDY BY SELLER; NO AGENCY
OBLIGATIONS
Buyer and Seller acknowledge and agree that the Purchase Price represents the current fair market value of the Option Property as set for the in the Appraisal. Buyer and Seller further acknowledge and agree that neither Seller nor the City, in their regulatory capacity or otherwise, has provided or agreed to provide any subsidy to the Buyer in connection with Buyer’s acquisition, development, use and/or operation of the Option Property, nor is there any plan to provide any such subsidy to the Buyer.
5 REQUIRED SUBMITTALS TO CITY
A. By the end of the Feasibility Deadline, as set for in Section 11 below, Buyer shall submit its complete application package to the City for all required entitlements, maps and approvals (the “Project Application”) for an approximately 200-key hotel, 42 stand-alone villas, related commercial uses, and associated onsite and offsite improvements (the “Project”).
B. Buyer shall submit the studies and plans reasonably required of Buyer to commence City’s CEQA review with the Project Application and shall thereafter diligently provide further materials reasonably requested by City. 6 ESCROW
A. Closing. Close of Escrow means the date on which the Grant Deed is recorded in the Official Records of the County of Riverside. The Close of Escrow will occur sixty (60) days after Buyer’s receipt of the Entitlements (defined below), subject to satisfaction of all of Buyer’s conditions described under Section 14, but in no event shall the Close of Escrow be later than the end of the Option Term, including any extension(s) implemented pursuant to Section
1.B.2 (the “Closing Date” or “Closing”). The Closing Date may, upon Buyer’s written request, be extended by the Executive Director as set forth in Section 9. Buyer may elect to close the Escrow before the scheduled Closing Date upon ten (10) days prior written notice to Seller.
B. Escrow Instructions; Costs. The provisions hereof shall constitute joint instructions to Escrow Holder to consummate the purchase in accordance with the terms and provision hereof. The parties shall execute such additional escrow instructions, not inconsistent with the provisions hereof, as may be deemed reasonably necessary to carry out the intentions of the parties as expressed herein; provided, however, if the provisions of any such additional instructions contradict with the provisions of this Agreement, then the provisions of this Agreement shall control. At Closing, (i) real estate taxes shall be prorated between Buyer and Seller as of the closing date, and (ii) all other closing costs to be paid 50/50 and any other prorations shall be allocated and paid in accordance with customary practices for escrows in Riverside County.
C. Deposit of Documents.
(1.) At or before the Closing, Seller shall deposit into Escrow the duly executed and acknowledged Deed (defined below) conveying the Option Property to Buyer and 699
-6-
the executed General Assignment (in form mutually acceptable to the parties and pertaining to the entitlements, approvals and other intangible property); (2.) At or before the Closing, Buyer shall deposit into Escrow the funds necessary to close this transaction; and
(3.) Seller and Buyer shall each deposit such other instruments as are reasonably required by the Title Company (defined below) or otherwise required to close the Escrow and consummate the purchase of the Option Property in accordance with the terms hereof.
D. Prorations. The current property taxes and assessments shall be prorated as of the Closing Date based on the tax assessor’s most recent tax bill for the Option Property except all delinquent taxes and assessments shall be paid by Seller. The parties shall cooperate in good faith following the Closing (and outside of the Escrow) to reconcile any prorations made at the Closing that do not accurately reflect the actual prorated cost or revenue. All prorations of amounts for which Seller is responsible but which Buyer pays or agrees to pay in the future shall be credited against the Purchase Price.
E. Balance of Purchase Price. Prior to 10:00 a.m. on the day of Closing, Buyer shall deposit by wire transfer to Escrow Holder in immediately available funds the balance of the Purchase Price, together with such other amounts as may be required in order to pay Buyer’s share of closing costs and prorations.
F. Closing Procedure. Upon receipt of all funds and instruments described in this Section 6, and upon satisfaction or waiver of all contingencies and conditions set forth in this Agreement, Escrow Holder shall:
(1.) Record the Grant Deed in the Official Records of Riverside County, California and deliver the General Assignment to Buyer. (2.) Issue or cause to be issued the Title Policy (as defined below) to the Buyer.
(3.) Deliver the Purchase Price to Seller, less any costs and expenses allocated to Seller as shown on the closing statements approved by Seller and Buyer, which costs and expenses shall be disbursed as instructed by Seller and Buyer in escrow instructions delivered to Escrow Holder prior to the Closing Date.
7 TITLE
A. Title Review Period. Buyer has procured or will procure a current preliminary title report respecting the Option Property (the “Title Report”) issued by First American Title Insurance Company National Commercial Services or another title company reasonably acceptable to the parties (the “Title Company”). Within sixty (60) days following the Effective Date (“Title Review Period”), Buyer shall disapprove in writing any exceptions contained in the Title Report to which Buyer objects (the “Disapproved Exceptions”); all exceptions set forth in the Title Report not so objected to by Buyer in writing shall be referred to as “Approved Exceptions”. Seller shall have ten (10) days after Buyer delivers such notice to advise Buyer if Seller will agree to remove any of such Disapproved Exceptions from title as of the Closing. If Seller does not so agree in writing to remove all of the Disapproved Exceptions, 700
-7-
then, until the Feasibility Deadline, Buyer may elect to terminate this Agreement, in which event the parties shall have no further rights or obligations hereunder; or, alternatively, Buyer may elect to waive its objection to those Disapproved Exceptions in which event such Disapproved Exceptions will be deemed to be Approved Exceptions. At the Closing, Seller shall convey its fee interest in and to the Option Property to Buyer (or to such other, affiliated entity as may be specified in Buyer’s escrow instructions and reasonably approved by Agency) by grant deed in a form reasonably mutually acceptable to Buyer and Seller (the “Deed”). Title to the Option Property shall be subject only to (i) a lien for then current taxes, bonds and assessments not yet delinquent, and (ii) the Approved Exceptions (collectively, the “Permitted Exceptions”). Immediately following recordation of the Deed, Escrow Holder shall issue to Buyer an A.L.T.A. Standard Coverage Owner’s policy of title insurance, with coverage in the amount of the Purchase Price for the Option Property, showing fee simple title to the Option Property vested in Buyer, subject only to the Permitted Exceptions (the “Title Policy”). Buyer may elect to obtain an extended coverage policy or additional title endorsements at Buyer’s cost and Seller shall reasonably cooperate in such process (including providing any required Owner’s Affidavit to the Title Company in form reasonably acceptable to Seller).
B. Exceptions following Title Review Period. If, after the Title Review Period and prior to the Closing date, any new title exceptions (“New Exceptions”) are first disclosed to Buyer, then Buyer shall have five (5) business days after receiving notice of such New Exception to object to such New Exception by delivering notice of such objection to Seller (“New Objection Notice”). Seller shall have five (5) business days following receipt of any New Objection Notice to notify Buyer in writing whether or not Seller elects to, at Seller’s sole option, to cause such New Exception to be removed as an exception, which shall be deemed the cure of such title defect (the “Seller New Objection Response”). If Seller elects to cause such New Exception to be removed, then it shall be a condition precedent to Buyer's obligation to purchase the Property that such identified objections are eliminated or modified to Buyer's reasonable satisfaction. If the New Objection Notice or the Seller New Objection Response is due after the then scheduled Closing Date, then the Closing Date shall be extended until the fifth (5th) business day following Buyer’s receipt of the Seller New Objection Response. If such New Exception is not so cured, Buyer may (i) waive in writing such objectionable New Exception and proceed to Closing, or (ii) terminate this Agreement and, thereafter, the parties shall have no further rights or obligations hereunder except for those obligations which expressly survive the termination of this Agreement. 8 “AS IS” PURCHASE; RELEASE OF SELLER; LIQUIDATED DAMAGES A. Buyer’s Independent Investigation. Buyer represents and warrants to Seller that Buyer shall, prior to the Feasibility Deadline, conduct such inspections and investigations of the Option Property as Buyer, in its discretion, deems necessary and appropriate, either independently or through agents of Buyer's choosing, including, without limitation, the following matters (collectively, the “Option Property Conditions”):
(1.) Matters relating to title including, without limitation, the existence, quality, nature and adequacy of Seller’s interest in the Option Property and the existence of physically open and legally sufficient access to the Option Property. (2.) The zoning and other legal status of the Option Property, including, without limitation, the compliance of the Option Property or its operation with any applicable 701
-8-
codes, laws, regulations, statutes, ordinances and private or public covenants, conditions and restrictions, and all governmental and other legal requirements such as taxes, assessments, use permit requirements and building and fire codes.
(3.) The quality, nature, adequacy, and physical, geological and environmental condition of the Option Property (including soils and any groundwater), and the presence or absence of any Hazardous Materials in, on, under or about the Option Property or any other real Option Property in the vicinity of the Option Property. As used in this Agreement, “Hazardous Material” shall mean any material that, because of its quantity, concentration or physical or chemical characteristics, is now or hereafter deemed by any federal, state or local governmental authority to pose a present or potential hazard to human health or safety or to the environment.
(4.) The suitability of the Option Property for Buyer’s intended use of the Option Property.
(5.) The economics and development potential, if any, of the Option Property.
(6.) All other matters of material significance to Buyer affecting the Option Property.
B. Hazardous Materials Disclosure. California law requires sellers to disclose to buyers the presence or potential presence of certain Hazardous Materials. Accordingly, Buyer is hereby advised that occupation of the Option Property may lead to exposure to Hazardous Materials such as, but not limited to, gasoline, diesel and other vehicle fluids, vehicle exhaust, office maintenance fluids, tobacco smoke, methane and building materials containing chemicals, such as formaldehyde. By execution of this Agreement, Buyer acknowledges that the notices and warnings set forth above satisfy the requirements of California Health and Safety Code Section 25359.7 and related statutes.
C. As-Is Purchase. Except for Seller’s express representations set forth in this Agreement, Buyer specifically acknowledges and agrees that Seller is selling and Buyer is purchasing Seller’s interest in the Option Property on an “as is with all faults” basis. Except for Seller’s express representations set forth in this Agreement, Buyer is relying solely on its independent investigation and not on any representations or warranties of any kind whatsoever, express or implied, from Seller or its agents as to any matters concerning the Option Property, including its suitability for Buyer's intended uses. Seller does not guarantee the legal, physical, geological, environmental or other conditions of the Option Property, nor does it assume any responsibility for the compliance of the Option Property or its use with any statute, ordinance or regulation. It is Buyer's sole responsibility to determine all building, planning, zoning and other regulations relating to the Option Property and the uses to which it may be put.
D. No Representations as to Property. Except as expressly set forth in this Agreement, there are no representations, agreements, arrangements, or circumstances, oral or written, between the parties relating to the subject matter contained in this Agreement, and Seller has not made and does not make any representation or warranty concerning any matter or thing 702
-9-
affecting or relating to the Property, including but not limited to its fitness for a particular use, its physical condition or any other matter.
E. Release/Indemnity. Buyer shall defend, indemnify, and hold harmless Seller, the City and their respective officials, officers, employees, consultants, contractors and agents (collectively, “Indemnitees”) from and against any and all actual and alleged claims, losses, damages, fines, costs, penalties, expenses (including reasonable attorneys’ fees, costs of experts and other litigation expenses), and liabilities of any type or nature, including those related or due to death or injury to any person and injury to any Option Property, proximately resulting from any negligent acts or omissions by Buyer related to the activities described or contemplated by this Agreement. No officials, officers, employees, consultants, contractors or agents of Seller or City shall be personally liable to Buyer, any voluntary or involuntary successors or assignees, or any lender or other party holding an interest in the Option Property, in the event of any default or breach by Seller or City, or for any amount which may become due to Buyer or to its successors or assignees, or on any obligations arising under this Agreement. No officials, officers, members, managers, partners, employees, consultants, contractors or agents of Buyer shall be personally liable to City or Seller in the event of any default or breach by Buyer, or for any amount which may become due to Seller or City, or on any obligations arising under this Agreement.
The provisions of this Section 8.E. shall survive the Closing hereunder or the termination of this Agreement and shall not be merged into the Deed.
F. LIQUIDATED DAMAGES: BUYER AND SELLER AGREE THAT IF,
AFTER THE FEASIBILITY DEADLINE BUYER DEFAULTS ON ITS OBLIGATION TO
PURCHASE THE OPTION PROPERTY PURSUANT TO THE TERMS AND CONDITIONS
OF THIS AGREEMENT AND SUCH DEFAULT REMAINS UNCURED FOLLOWING THE NOTICE AND CURE REQUIRED BY SECTION 26.G, THE DAMAGES TO SELLER WOULD BE DIFFICULT AND IMPRACTICAL TO DETERMINE. ACCORDINGLY, BUYER
AND SELLER HAVE AGREED TO FIX AS LIQUIDATED DAMAGES THE OPTION
CONSIDERATION, AND SUCH AMOUNTS SHALL BE PAYABLE (OR RETAINED AS
APPLICABLE) TO SELLER AS LIQUIDATED DAMAGES, AND SHALL CONSTITUTE SELLER’S SOLE AND EXCLUSIVE REMEDY FOR SUCH DEFAULT. BUYER AND
SELLER AGREE THAT THIS LIQUIDATED DAMAGES PROVISION IS REASONABLE
UNDER THE CIRCUMSTANCES EXISTING AS OF THE EFFECTIVE DATE, GIVEN THE DIFFICULTY AND IMPRACTICALITY OF DETERMINING SELLER’S DAMAGES, THE
COSTS OF NEGOTIATING AND DRAFTING THIS AGREEMENT, PERFORMING SELLER’S OBLIGATIONS HEREUNDER, KEEPING THE OPTION PROPERTY OUT OF
THE MARKETPLACE, COSTS OF SEEKING ANOTHER BUYER AND OTHER COSTS INCURRED IN CONNECTION HEREWITH. PAYMENT OF SUCH AMOUNT TO SELLER
AS LIQUIDATED DAMAGES IS NOT INTENDED AS A FORFEITURE OR PENALTY UNDER CALIFORNIA CIVIL CODE SECTIONS 3275 OR 3369, BUT INSTEAD, IS
INTENDED TO CONSTITUTE LIQUIDATED DAMAGES TO SELLER PURSUANT TO SECTIONS 1671, 1676 AND 1677 OF THE CALIFORNIA CIVIL CODE. SELLER HEREBY WAIVES THE PROVISIONS OF CALIFORNIA CIVIL CODE SECTION 3389. SELLER
AGREES THAT THESE LIQUIDATED DAMAGES SHALL BE IN LIEU OF ANY OTHER
MONETARY RELIEF OR OTHER REMEDY, INCLUDING WITHOUT LIMITATION
SPECIFIC PERFORMANCE, TO WHICH SELLER OTHERWISE MIGHT BE ENTITLED 703
-10-
UNDER THIS AGREEMENT, AT LAW OR IN EQUITY. BUYERAND SELLER
SPECIFICALLY ACKNOWLEDGE THEIR AGREEMENT TO THE FOREGOING
LIQUIDATED DAMAGES PROVISION BY INITIALING THIS SECTION IN THE APPROPRIATE SPACES PROVIDED BELOW:
Buyer’s Initials _______ Seller’s Initials _______
9 POSSESSION; MAINTENANCE OF OPTION PROPERTY
Seller shall deliver to Buyer possession of the Option Property immediately on Closing, free of all uses, tenancies and occupancies unless approved by Buyer. Until possession is delivered to Buyer, subject to Buyer’s authorization to enter the Option Property as set forth in Section 11, Seller agrees, at its sole cost and expense, to maintain and keep the Option Property and all the improvements thereon in not less than the same order and condition as they are on the date this Agreement is executed by Seller. Pending the Closing, Seller shall continue to manage and operate the Option Property and maintain insurance covering the Option Property in substantially the same manner as Seller has managed and operated the Option Property for the last twelve (12) months, and shall not commit waste or otherwise materially and adversely affect the Option Property. 10 EXECUTIVE DIRECTOR AUTHORITY
The Executive Director of the Agency (“Executive Director”) shall have the authority to take all actions and execute all documents required or necessary for the Agency to perform its obligations under this Agreement, to extend each of the Closing Date or Feasibility Deadline for up to one hundred and eighty (180) days (or for an additional period beyond said one hundred and eighty (180) days), and to otherwise complete the Closing and conveyance of the Option Property to Buyer pursuant to this Agreement. Further, Executive Director may execute any entitlement applications in connection with the Buyer’s future use of the Option Property, where the signature of the Agency is required as the owner of the Option Property. 11 DUE DILIGENCE
Buyer shall have until the date that is one hundred and eighty (180) days following the Effective Date (the “Feasibility Deadline”) to determine the feasibility of the Option Property for Buyer’s intended use in Buyer’s sole discretion by its delivery of its written notice of feasibility approval (the “Buyer Feasibility Approval”) to Seller and Escrow Holder on or before 5:00 p.m.
Pacific Time on or before the Feasibility Deadline. Buyer’s failure to deliver to Seller and Escrow Holder the Buyer Feasibility Approval on or before the Feasibility Deadline shall automatically be deemed to constitute Buyer’s termination of this Agreement.
From and after the Effective Date of this Agreement, Buyer may enter upon the Option Property until the earlier of the Closing or termination of this Agreement to conduct any investigation, test, study or analysis related to the development thereof, including, but not limited to, soils studies, Phase I and/or Phase II toxic studies, engineering studies, tree surveys, archeological studies, biological studies, utilities and constraints study, hydrology studies and any other matters necessary to evaluate the development of the Option Property. Buyer shall pay all costs with respect to such studies and tests and shall be solely responsible for the disposal of any soil samples (including any Hazardous Materials or other wastes in these samples), which 704
-11-
obligation shall survive the termination of this Agreement. Buyer shall exercise due care, follow best commercial practices in connection with such entry and testing, and shall comply with all laws, ordinances, rules, regulations, orders and the like in connection with any entry onto or testing of the Option Property. Prior to any entry onto the Option Property, Buyer shall obtain and maintain, and shall require that its agents, consultants, contractors and representatives (collectively, the “Agents”) to obtain and maintain in full force during the term of this Agreement, at Buyer’s sole cost and expense, a policy of comprehensive liability insurance, including Option Property damage, which will insure Agency, City and their respective officers, members, employees and agents against liability for injury to persons, damage to Option Property, and death of any person arising in connection with Buyer or its Agents entry upon the Option Property and/or conducting of tests or studies thereon. The policy shall be approved as to form and insurance (including approval of the insurance company) by the Agency, and shall be in an amount not less than One Million Dollars ($1,000,000). Buyer shall provide Agency with a certificate for any insurance policy required hereunder, including an endorsement, if reasonably available, that states that the policy will not be cancelled except after thirty (30) days' notice in writing to Agency and names the additional insureds as required herein. Buyer shall provide Agency with evidence of such insurance coverage prior to any entry onto the Option Property by Buyer or its Agents.
Following any such tests or studies, Buyer shall leave the Option Property in substantially similar condition as of the Effective Date of this Agreement, and Buyer shall indemnify, defend and hold harmless Seller, City, and their respective officers, members, employees and agents from and against any liabilities, claims, damages (including injury or damage to person or Option Property), losses, costs, expenses and fees (including reasonable attorneys’ and experts’ fees and costs) to the extent resulting from the entry, inspections and studies conducted by Buyer and its Agents on, under, or about the Option Property, except that Buyer shall have no liability under this Section 11 for, and no obligation to remedy, any liabilities, claims, damages, costs, expenses, fees, conditions or defects on or under the Option Property to the extent (i) not caused by Buyer or its Agents, (ii) resulting from any conditions or defects discovered during Buyer’s investigations and inspections, including the discovery of any Hazardous Materials and the results or findings of any tests, or (iii) to the extent resulting from the acts or omissions of Seller, or Seller’s agents, engineers, contractors, consultants and representatives. Without limiting the foregoing, Buyer shall have no liability for any diminution in the value of the Option Property resulting from the activities excluded in (ii) above, provided in the event Buyer or its Agents discover any toxic or Hazardous Materials on or under the Option Property, Buyer and its Agents shall cease any further investigation in that area of the Option Property, promptly notify Seller by phone and email following discovery, exercise reasonable due care so as not to exacerbate that condition and properly dispose of any soils samples which contain such toxic or Hazardous Materials. Nothing in this Section is intended to limit or modify the indemnity contained in Section 8.E, provided that such qualifications and limitations on Buyer’s indemnity, defense and hold harmless obligations shall also apply to the Buyer indemnity and related obligations set forth in Section 1D. The foregoing indemnity shall survive beyond the Closing, or, if the sale is not consummated, beyond the termination of this Agreement.
To the extent Seller has not previously done so, Seller shall make available to Buyer for Buyer’s review and inspection, during the term of this Agreement at the office of Seller and upon at least twenty-four (24) hours’ prior notice, and in each case to the extent the materials are in the Seller’s possession or control, copies of all soil and hydrology reports, environmental or toxic material reports, biological reports, archeological reports, engineering reports, traffic studies, 705
-12-
environmental impact studies, or any public records which concern the Option Property (collectively the “Documents”). Buyer shall have the right, at Buyer’s cost, to make copies of the Documents for Buyer’s review and approval but if this Agreement is terminated, Buyer shall, upon the written request of Seller, return all such Documents and copies to Seller. Seller makes no representation or warranties whatsoever regarding the existence, availability, completeness or accuracy of the Documents. Buyer shall promptly deliver to Seller copies of any reports relating to any testing or other inspection of the Option Property performed by Buyer or its agents, employees or contractors (the “Buyer Work Product”), but shall not deliver copies of any such reports to any other person or entity without Seller’s prior written approval, except for Buyer’s attorneys, consultants, agents and others assisting Buyer in connection with the acquisition and development of the Option Property. Seller acknowledges and agrees that any and all of the Buyer Work Product is provided by Buyer for informational purposes only and do not constitute representations or warranties of Buyer of any kind, including any representations and warranties concerning the accuracy or completeness of any information in the Buyer Work Product. 12 CONDITIONS TO BUYER’S PERFORMANCE
Upon Buyer’s timely written Option Exercise, Buyer’s obligation to purchase the Option Property under this Agreement is subject to Buyer’s written approval of the following conditions precedent (“Buyer’s Closing Conditions”), but Buyer shall have the right to waive any such condition(s) in writing within the time period specified in such condition, or if not specified, prior to the Closing. Waiver of a Buyer’s Closing Condition shall not waive any underlying representation, warranty, covenant or accrued claim unless expressly stated in the written waiver.
In the event Buyer in good faith determines that any such condition is objectionable, unacceptable, or cannot be satisfied within the period specified below, or if no time period is specified then prior to Closing, Buyer may, in its sole and absolute discretion, fail to approve said condition.. The Option Consideration shall be retained by Seller, except as expressly provided in Sections 1.B, 19 and 22. If the Closing occurs and Buyer has failed to disapprove of any of the following Buyer’s Closing Conditions, then such condition(s) shall be deemed waived. Closing shall not release obligations or claims that expressly survive Closing.
A. Feasibility Study. Buyer’s approval of the feasibility of the Option Property for Buyer’s intended use in accordance with Section 11 prior to the Feasibility Deadline.
B. Truth and Accuracy of Seller’s Representations and Warranties. Seller’s representations and warranties as set forth in this Agreement shall be true and correct on the Effective Date of this Agreement and on the Closing Date.
C. Title. Escrow Holder is irrevocably and unconditionally committed to issue to Buyer the Title Policy at the Closing with no exceptions to coverage other than the Permitted Exceptions, and no person or entity has any right to use or occupy the Option Property, except as shown in any Permitted Exceptions in the Title Policy.
D. State Approval. Seller shall have obtained State Approval of this Agreement.
706
-13-
E. Seller’s Other Obligations. Seller shall have performed all of its other covenants and obligations as set forth in this Agreement.
F. Entitlements. Buyer shall have received final approval (beyond any challenge or appeal period with no challenge or appeal then pending) of all necessary land-use approvals (including CEQA clearance), authorizations and entitlements, including but not limited to a Tentative Tract Map, Final Map, a Precise Plan, all Building and Grading Permits, any Conditional Use Permit, any Planning Commission and City Council approvals, and all architectural approvals, to develop and construct the Project on the Option Property, consistent with the Project Application, with conditions of approval acceptable to Buyer (including any offsite obligations and required onsite improvements) (collectively, the “Entitlements”).
G. Development Agreement. Buyer shall execute a Development Agreement with the City, regarding the development of the Project.
H. Financial Commitments. Buyer shall provide Seller evidence of complete financing for the purchase of the Option Property and the development of the Project.
I. Execution of Construction Contracts. Buyer shall execute all necessary construction contracts for the development of the Project.
J. Compliance with Development Deadlines. Buyer shall comply with the following deadlines regarding the development of the Project:
(1.) Within six (6) months of the Effective Date, Buyer shall submit the Project Application to the City.
(2.) Within twenty-four (24) months of the Effective Date, Buyer shall obtain all Entitlements. This deadline may be extended pursuant to Section 1.B.2.a. (3.) Within twelve (12) months after entitlement approved, Buyer shall complete construction drawings sufficient for issuance of building permits, obtain all necessary permits to commence construction, execute all construction contracts, secure all construction financing, and close. This deadline may be extended pursuant to Section 1.B.2.b. (4.) Within thirty (30) days of closing, commence construction on the Project.
(5.) Within twenty-four (24) months of commencing construction, complete the Project.
13 CONDITIONS TO SELLER’S PERFORMANCE
The following are conditions precedent to Seller’s obligation to sell the Option Property to Buyer (“Seller’s Closing Conditions”):
A. Riverside County Oversight Board, and State Department of Finance (if required), shall have approved of this Agreement.
707
-14-
B. Buyer shall have received final approval (beyond any challenge or appeal period with no challenge or appeal then pending) of the Entitlements.
C. Buyer shall require that City:
(1.) Execute a Development Agreement with the Buyer, regarding the development of the Project;
(2.) Explore regional infrastructure improvements;
(3.) Relocate Desert Willow Mountain View Golf Course Hole No. 5; and
(4.) Consider shared parking opportunities for the Project at Desert Willow Mountain View Golf Course.
D. Approval of the building permit for the First Phase Improvements by the City Building and Safety Department and ability to issue upon only the payment of required fees.
E. Buyer shall have performed all of its obligations hereunder and all of Buyer’s representations and warranties shall be true and correct.
F. State Approval. Seller shall have obtained State Approval of this Agreement.
G. Seller’s Other Obligations. Seller shall have performed all of its other covenants and obligations as set forth in this Agreement.
H. Entitlements. Buyer shall have received final Entitlements.
I. Development Agreement. Buyer shall execute a Development Agreement with the City, regarding the development of the Project.
J. Financial Commitments. Buyer shall provide Seller evidence of complete financing for the purchase of the Option Property and the development of the Project.
K. Execution of Construction Contracts. Buyer shall execute all necessary construction contracts for the development of the Project.
Each of Seller’s conditions precedent are intended solely for the benefit of Seller and is deemed to be material to and of the essence of this Agreement. If any of Seller’s conditions precedent are not satisfied as provided above as a result of a Buyer material default, Seller may, at its option, terminate this Agreement. In such event, then (without limiting Seller’s remedies for a breach by Buyer of its obligations under this Agreement) the Option Consideration shall be delivered to Seller by Escrow Holder. If the Closing occurs and Seller has failed to disapprove of any of Seller’s Closing Conditions, then such condition(s) shall be deemed waived. 14 SELLER’S REPRESENTATIONS AND WARRANTIES AND
COVENANTS
708
-15-
A. Representations and Warranties. Seller hereby makes the representations and warranties set forth in this Section 14 for the benefit of Buyer and its successors and assigns for a period of one (1) year from and after the Closing Date, after which Seller’s representations and warranties will be of no further force or effect. Seller shall notify Buyer in writing within ten (10) Business Days after Seller’s Executive Director receives actual knowledge that any representation or warranty has become untrue or misleading in light of information obtained by Seller after the Effective Date of this Agreement, and if such ten (10) Business Day period would expire after the Closing, then the Closing shall be extended until the expiration of the ten (10) Business Day period. As used herein, “Seller’s knowledge” shall mean the present actual, not constructive, knowledge of Seller without any investigation or inquiry or duty to do so. All representations and warranties contained in the Agreement shall be deemed remade at Closing except as otherwise disclosed to Buyer in writing, shall survive the Closing for the prescribed one-year period and shall not merge with the Deed. (1.) Seller has received no notice of any litigation, arbitration or proceeding pending before any court or administrative agency or any other condition that relates to or affects the Option Property, Seller’s performance hereunder, Buyer’s intended use of the Option Property, or which will result in a lien, charge, encumbrance or judgment against any part of or any interest in the Option Property, except (i) as disclosed in the Title Report, or (ii) as otherwise disclosed to Buyer in writing.
(2.) Seller has received no notice that the Option Property is in violation of any federal, state or local law, statute, regulation, code or ordinance, including without limitation, any law, statute, code or ordinance relating to Hazardous Materials, and if any such notice is received, Seller shall promptly provide Buyer with a copy thereof. (3.) Seller is not a foreign person, foreign corporation, foreign partnership, foreign trust or foreign estate, as those terms are defined in the Internal Revenue Code Section 1145 and any related regulations and Seller is exempt from the withholding obligations imposed by California Revenue and Taxation Code Sections 18805, 18815, and 26131. (4.) In compliance with Executive Order 13224 and the USA Patriot Act of 2001, Seller affirmatively represents and warrants to Buyer that (a) neither it, nor any of its officers, directors, or principals, has committed or supported terrorist acts; or (b) neither it, nor any of its officers, directors, or principals is identified on the list of Specially Designated Nations and Blocked Persons generated by the Office of Foreign Assets Control. (5.) There are currently no other contracts for the sale of all or any portion of the Option Property pending, nor do there exist any rights of first negotiation, rights of first refusal, rights of first offer, purchase options or similar rights with respect to the Option Property.
B. Seller Covenants. From the Effective Date until the Closing, and in addition to any other covenants of Seller set forth in this Agreement:
(1.) Seller shall not, prior to the Closing, cause any Hazardous Materials to be brought onto the Option Property except in the ordinary course of operating the Option Property in compliance with all applicable laws.
709
-16-
(2.) Seller shall reasonably cooperate with Buyer, at no cost, expense or liability to Seller, in connection with Buyer’s processing of the Entitlements, which cooperation may include executing applications and other required submittals and consulting with Buyer regarding CEQA matters.
(3.) Seller shall not initiate, consent to, approve, enter into, modify, revise or otherwise take any affirmative action with respect to any permits, approvals, entitlements, easements, licenses, conditions, covenants, restrictions, regulations, land use or zoning restrictions and the like, or any other laws, other than such actions as required to maintain existing permits and approvals or to maintain the Option Property in compliance with such laws. (4.) Seller shall not take or fail to take any action which would (i) materially alter the physical condition of the Option Property, or (ii) have a material and adverse effect upon Buyer’s intended use of the Option Property. (5.) Seller shall not sell, convey, grant, assign, mortgage, pledge, hypothecate or otherwise transfer, restrict or dispose of all or any part of the Option Property or any interest therein.
(6.) Seller shall not permit, enter into, approve or consent to any covenant, agreement, condition, restriction, encumbrance, charge or lien upon, against or applicable to the Option Property, unless same (i) is specifically permitted by the terms of this Agreement, (ii) has been pre-approved by Buyer in writing, or (iii) is removed by Seller at or prior to the Closing.
15 BUYER’S REPRESENTATIONS AND WARRANTIES
A. Buyer hereby makes the representations and warranties set forth in this Section 15 for the benefit of Seller and its successors and assigns for a period of one (1) year from and after the Closing Date, after which Buyer’s representations and warranties will be of no further force or effect. Buyer shall notify Seller in writing within ten (10) Business Days after Buyer receives actual knowledge that any representation or warranty has become untrue or misleading in light of information obtained by Buyer after the Effective Date of this Agreement, and if such ten (10) Business Day period would expire after the Closing, then the Closing shall be extended until the expiration of the ten (10) Business Day period. As used herein, “Buyer’s knowledge” shall mean the present actual, not constructive, knowledge of Buyer without any investigation or inquiry or duty to do so. All representations and warranties contained in the Agreement shall be deemed remade at Closing except as otherwise disclosed to Seller in writing, and shall survive the Closing for the prescribed one-year period.
B. Buyer represents and warrants that it is a corporation duly organized under the laws of California, in good standing and authorized to conduct business in State of California, has the capacity and full power and authority to enter into and carry out the agreements contained in and the transactions contemplated by this Agreement, and that this Agreement has been duly authorized and executed by Buyer, and upon delivery to Seller following execution by Buyer, shall be a valid and binding agreement of Buyer.
710
-17-
C. There is no action, suit, arbitration, unsatisfied order or judgment, government investigation or proceeding pending or, to the actual knowledge of Buyer threatened, against Buyer which, if adversely determined, could individually or in the aggregate materially interfere with the consummation by Buyer of the transaction contemplated by this Agreement.
D. In compliance with Executive Order 13224 and the USA Patriot Act of 2001, Buyer affirmatively represents and warrants to Seller that (a) neither it, nor any of its officers, directors, or principals, has committed or supported terrorist acts; or (b) neither it, nor any of its officers, directors, or principals is identified on the list of Specially Designated Nations and Blocked Persons generated by the Office of Foreign Assets Control. 16 COMMISSIONS
Each party represents to the other that it has not dealt with any broker, agent, or finder for which a commission or fee is payable with respect to the Option Property or this Agreement, and each party shall indemnify, defend and hold harmless the other from any claims, demands, liabilities, or judgments for commissions or fees arising from such party’s breach of this Section.
The foregoing indemnification, defense and hold harmless obligations of the parties shall survive Closing and any termination of this Agreement.
17 FOREIGN INVESTOR DISCLOSURE
Seller understands that if Seller is unable to certify that it is U.S. citizen or a resident of the State of California at the time of the Closing, Buyer shall be entitled to withhold from the purchase price such amounts as are necessary to satisfy Buyer’s withholding obligations under the Foreign Investment in Real Property Tax Act and under California Revenue and Taxation Code Sections 18805, 18815 and 26131.
18 FUTURE LEASES, COMMITMENTS AND ENCUMBRANCES
From and after the Effective Date of this Agreement, except to the extent required by law or otherwise, Seller shall not (a) execute, modify and/or approve any leases, contracts or commitments affecting the Option Property that would extend beyond the Closing Date without Buyer’s written approval; which approval may be given or withheld in Buyer’s sole discretion; or (b) voluntarily encumber the Option Property with any liens, encumbrances or other instruments creating a cloud on title or securing a monetary obligation with the Option Property. 19 CONDEMNATION/CASUALTY
If after the Effective Date of this Agreement and prior to the Closing all or any part of the Option Property is taken or threatened to be taken by eminent domain or condemnation or is destroyed by fire, earthquake or other casualty, Buyer may elect either (a) to terminate this Agreement as to the entire Option Property, in which event the Option Consideration shall be returned to Buyer, and this Agreement shall be null and void and of no further force or effect, or (b) to consummate purchase of the Option Property as herein provided, in which event Seller shall pay or assign to Buyer all condemnation awards or payments in respect of the Option Property and/or all insurance proceeds paid or payable to Seller as a consequence of such casualty. If this Agreement is terminated in full pursuant to this Section 19, neither party shall have any further 711
-18-
rights, duties, obligations or liabilities, at law or in equity, arising out of or relating to this Agreement except for those that specifically survive termination of this Agreement pursuant to other provisions hereof.
20 TERMINATION
Seller reserves the right to terminate this Agreement at 5:00 p.m. on the fourth anniversary of the Effective Date.
21 AMENDMENTS
This Agreement expresses the agreement of the parties. There are no other understandings, oral or written, which in any manner alter or enlarge its terms. This Agreement supersedes any and all prior agreements between the parties hereto regarding the Option Property. Seller and Buyer agree to execute such additional documents as may be reasonable and necessary to carry out the provisions of this Agreement. This Agreement may be amended, but only in writing and only if such writing is executed by both parties.
22 BUYER’S REMEDIES; NO MONEY DAMAGES
If Seller defaults on its obligation to convey title to the Option Property to Buyer in the manner required hereby or otherwise breaches this Agreement, Buyer shall have the right to (i) seek specific performance of this Agreement, or (ii) alternatively, Buyer may terminate this Agreement, in which case Buyer shall be entitled to an immediate return of the Option Consideration. Buyer shall have no further right to seek damages, whether compensatory, incidental, general, special, consequential or punitive. The failure of Buyer to receive approval of any applicable development permits, maps, or other entitlements for the Option Property shall not constitute a default or breach of Seller’s obligations contained in this Agreement. Buyer acknowledges that, except as expressly described above, Seller would not have entered into this Agreement if doing so would subject it to the risk of incurring liability in money damages, either for breach of this Agreement, anticipatory breach, repudiation of the Agreement, or for any actions with respect to its negotiation, preparation, implementation or application. Notwithstanding the preceding provisions of this Section 22, nothing in this Section 22 shall limit Buyer’s remedies at law or in equity with respect to (a) any breach by Seller that constitutes fraud, (b) any claim made by Buyer after the Closing in respect of a breach by Seller of any covenants, representations, warranties or obligations that survive the Closing, subject to the limitations set forth in this Agreement applicable thereto, or (c) any claim for indemnification, defense or holding Buyer harmless based on the provisions of this Agreement (which by their express terms survive the Closing or termination of this Agreement) (the “Remedy Limitation Exclusions”). The parties further acknowledge that money damages and remedies at law generally are inadequate, and specific performance is the most appropriate remedy for the enforcement of this Agreement and should be available to Buyer. Therefore, the parties hereby acknowledge and agree that it is a material part of Buyer’s consideration to Seller that Seller shall not be at any risk whatsoever of liability for money damages relating to or arising from this Agreement except as provided in this Section 22. Except for the express indemnity obligations hereunder and the express remedies provided for herein, including the remedy of specific performance and the Remedy Limitation Exclusions, Buyer, for itself, its successors and assignees, hereby releases Agency, the City and 712
-19-
their respective officers, members, employees and agents from any and all claims, demands, actions, or suits of any kind or nature arising out of any liability, known or unknown, present or future, including, but not limited to, any claim or liability, based or asserted, pursuant to Article I, Section 19 of the California Constitution, the Fifth and Fourteenth Amendments of the United States Constitution, or any other law or ordinance which seeks to impose any money damages, whatsoever, upon the parties because the parties entered into this Agreement, because of the terms of this Agreement, or because of the manner of implementation or performance of this Agreement. 23 ATTORNEYS’ FEES
If this Agreement or the transaction contemplated herein gives rise to a lawsuit or other legal proceeding between the parties hereto, the prevailing party shall be entitled to recover its costs and reasonable attorneys’ fees and costs of litigation in addition to any other judgment of the court.
24 ASSIGNMENT
Without Seller’s written consent, which may be withheld, delayed or conditioned, in Seller’s reasonable discretion, Buyer’s rights and obligations under this Agreement may not be assigned to any other party. Prior to any proposed assignment hereunder, Buyer shall give Seller not less than fifteen (15) days prior written notice of such assignment. As a condition to any permitted assignment hereunder, the assignee shall assume in writing all of the obligations of Buyer under this Agreement and shall agree to perform all the obligations of Buyer hereunder as if such assignee were the original Buyer hereunder. Any such approved assignee shall have all the benefits, including rights to specific performance, damages, and enforcement of Seller’s representations and warranties that Buyer has under this Agreement. No such assignment, however, shall relieve Buyer of any of its obligations hereunder without Seller’s agreement to do so. Notwithstanding the foregoing, Buyer shall be permitted upon no less than fifteen (15) days’ written notice to assign this Agreement to a parent, affiliate, or subsidiary of Buyer or otherwise directly or indirectly owned or controlled by Buyer or a parent, affiliate or subsidiary of Buyer (each a "Permitted Assignee"). For purposes of clarity, any entity in which Buyer or a majority of the shareholders of Buyer have a direct or indirect ownership or economic interest and/or day to day management and control (subject to consent for major decisions and the like) shall be deemed to be a Permitted Assignee hereunder.
25 NOTICES
All notices or tender required or permitted herein shall be in writing and shall be sent to the address set forth below (or such other address as a party may hereafter designate for itself by written notice to the other parties as required hereby) of the party for whom such notice or communication is intended:
If to Seller: Successor Agency to the Palm Desert
Redevelopment Agency
Attn: Executive Director
City of Palm Desert
73510 Fred Waring Drive
Palm Desert, CA 92260
713
-20-
Email:
Tel::
Fax: 760-341-6372
With copy to: Best Best & Krieger LLP
Attn: Seth Merewitz
300 South Grand Ave., 25th Floor
Los Angeles, CA 90071
Email: [email protected]
Tel: 213-787-2567
Fax:
If to Buyer: Kam Sang Company
With copy to:
Any such notice or communication shall be sufficient if sent by registered or certified mail, return receipt requested, postage prepaid; by hand delivery; by overnight courier service; or by fax or electronic mail if receipt is confirmed by the recipient. Any such notice or communication shall be effective on the Business Day delivered to the office of the addressee or upon refusal of such delivery, or three (3) Business Days after deposit by first class mail. Notice transmitted after 5:00 p.m. or on Saturday or Sunday shall be deemed to have been given on the next Business Day.
Should any act or notice required hereunder fall due on a weekend or holiday, the time for performance shall be extended to the next Business Day. 26 MISCELLANEOUS
A. Section headings contained herein are included solely for convenience of reference and shall in no way affect the construction of this Agreement.
B. Time is of the essence of this Agreement.
C. This Agreement shall be governed by the laws of the State of California.
D. Each party shall execute, acknowledge, and deliver, after the Effective Date of this Agreement, including at or after closing, such further assurances, instruments and documents as the other may reasonably request in order to fulfill the intent of this Agreement and the transactions contemplated hereby.
E. If any provision of this Agreement is held by a court of competent jurisdiction to be invalid or unenforceable, the remainder of this Agreement shall continue in full force and effect and shall in no way be impaired or invalidated, and the parties agree to substitute for the invalid or unenforceable provision a valid and enforceable provision that most closely approximates the intent and economic effect of the invalid or unenforceable provision.
F. This Agreement may be executed in counterparts, and transmitted by facsimile or as an attachment to electronic mail by and to each of the parties, and each such 714
-21-
counterpart shall be deemed an original, and all of them together shall constitute a single instrument.
G. If a party hereto believes the other party is in breach or default under this Agreement, the non-breaching party shall deliver written notice of the alleged breach or default to the other party, and the other party shall have ten (10) Business Days after receipt of such written notice in which to cure the breach or default, and if the breach or default is actually cured within such ten (10) Business Day period, the breaching party shall not be in breach or default under this Agreement by reason of the matter(s) alleged in the non-breaching party’s notice that have been so cured.
H. Except as expressly set forth herein, this Agreement is not intended nor shall it be construed to create any third party beneficiary rights in any person who is not expressly made a party and signatory hereto.
I. If Buyer executes this Agreement before Seller, such execution and delivery of the Agreement shall be deemed an offer to buy the above described Option Property for the price and upon the terms and conditions herein stated.
INTENTIONALLY LEFT BLANK;
SIGNATURES FOLLOW IMMEDIATELY ON NEXT PAGE
715
-22-
Seller: Buyer:
Successor Agency to the Palm Desert
Redevelopment Agency
Kam Sang Company, a California
Corporation
By: By:
Name: Name:
Title: Title:
Date: Date:
APPROVED AS TO FORM: APPROVED AS TO FORM:
By: By:
Name: Name:
Title: Special Legal Counsel Title: Buyer’s Counsel
Date: Date:
ATTESTS:
By:
Name:
Title: City Clerk
Dated:
List of Exhibits
A Description of Option Property
A-1 Map of Option Property
716
-23-
The undersigned representative of Escrow Holder hereby accepts the foregoing instructions and agrees to comply with them in connection with the purchase and sale of the Option Property.
Escrow Holder:
Effective Date:
By:
Authorized Representative
717
-24-
Exhibit A
Description of the Option Property
Approximately 34.11 acres known as the following in the City of Palm Desert, County of Riverside, California:
620-450-013
620-450-014
620-450-016
620-450-018
620-450-020
Legal Description
Real property in the City of Palm Desert, County of Riverside, State of California, described as follows:
Lots 5 and 6 of Tract Map No. 29528, in the City of Palm Desert, County of Riverside, State of California, as per plat recorded in Book 311 Pages 40 to 42 inclusive of Maps, records of Riverside County, California.
APN: 620-450-012 (Affects: Portion Of Lot 5); 620-450-013 (Affects: Portion Of Lot 5); 620- 450-014 (Affects: Portion Of Lot 5); 620-450-016 (Affects: Portion Of Lot 6); 620-450-017 (Affects: Portion Of Lot 6); 620-450-018 (Affects: Portion Of Lot 6); and 620-450-020 (Affects:
Portion Of Lot 6)
718
-25-
Exhibit A-1
Map of Option Property
719
720
WILLOW RIDGE
DESERT WILLOW DRIVE
MARKET PLACE
620450013
620450017
620450020
620450012
620450018
620450014
620450016
Copyright nearmap 2015
Desert Willow Lot Pads C and D
±
VICINITY MAP SARDA OWNED
721
722
723
724
V V V V V s FH V V V FH V V s V V V V V V V V V V V V V V V V V V V V V s s V s s V V FH s V V V s s V s V X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 255 255 260 265 265 270 275 265 265 265 260 255 250 265 270245 245 250 255 260 265 270 270 265 260 255 260 260 255 250 250 255 260 265 270 260 245 250 255 250
260
260
255 255
260 262.6 263.6 254.3 253.3 266.4 273.7 262.7 248.2 257.6 249.8 247.9 264.8 259.6 259.7 273.7 272.4 272.5 273.3 249.6 271.3 271.6 262.7 257.2 258.5 244.6 245.6 254.5 246.2 247.4 259.4 267.4 271.8 272.5 253.5 258.3 262.1 263.3 265.6 273.3 273.4 272.2 271.7 255.3 265.7 260.3 259.5 262.6 257.4 260.5 272.4 250.8 251.7 254.6 258.4 265.5 267.7 256.4 257.4 256.6 256.5 257.2 258.5 256.8 262.8 267.8 267.2 266.7 266.4263.8 263.3 262.3 262.7 261.7 265.5 266.5 274.5 271.4 259.9 262.6 264.3 264.5 260.3 263.4 263.4 260.6 262.5 261.7 260.7 258.7 257.5 246.5 249.5 260.4 262.5 262.5 257.7 259.2 260.5 250.6 246.6 246.8 250.5 245.6 256.4 253.3 261.8 272.4 272.4 271.6 271.6 271.7 272.8 272.7 272.8 272.3 260.5 262.8 259.6 264.6 267.6 264.2 267.6 268.5 273.4 255.8 265.4 262.3 271.7 270.7 272.5 270.5 266.6 259.5 263.5 256.5 258.5 253.6 253.5 265.8 252.7 255.5 249.4 252.5 257.6 258.5 263.7 263.6 258.7 257.4 252.5 257.4 267.5 267.1 242.1 244.5 244.6 248.5 272.4 272.3 272.6 272.6 271.7 272.3 261.8 272.8 272.5 272.5 262.7 260.4 263.5 263.3 262.3 271.6 259.4 Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured Ground Obscured 275.4 CONCEPTUAL L1.0 PLAN LIC# 2754 PH. (760) 777-9131 FAX (760) 777-9132 77-899 WOLF RD. PALM DESERT, CA HERMANN 92211 EXP. 4/30/28 DESIGN GROUP SUITE 102725 726
City of Palm Desert Staff Report
Meeting Date: November 12, 2026
Prepared By: Chris Gerry, Senior Project Manager
Department: Public Works
Subject: Design-Build Contract to Best Signs, Inc., for the Entry Monument Signage Project (Project No. CSS00001) and Provide Direction on the Wayfinding Signs and William F. Cody-Designed Monument Sign
Recommendation
1. Award a Design-Build Contract to Best Signs, Inc., for the Entry Monument Signage Project in the amount of $874,840, plus a contingency of $200,000 for unforeseen expenses.
2. Authorize the City Attorney to make necessary nonmonetary changes to the agreement.
3. Authorize the City Manager to execute the agreement and any written requests for amendments up to the $200,000 contingency amount, and any other documents necessary to effectuate this action.
4. Authorize the City Manager to execute the Notice of Completion (NOC) and the City Clerk to file the NOC upon satisfactory completion of the Project.
5. Provide direction on whether to proceed with the citywide wayfinding signs and William F. Cody-designed monument sign.
Background
In March 2023, the City Council directed staff to develop a new citywide wayfinding master plan, including three entry monument signs. The effort addresses two objectives: helping residents and visitors navigate to key destinations and identifying major gateways to Palm Desert. On January 22, 2026, the City Council approved the Citywide Wayfinding and Monument Sign Master Plan (Master Plan), establishing the design standards and locations for the improvements.
On October 8, 2026, the City Council considered a $2,434,055 design-build contract with Best Signs, Inc., to implement the approved Master Plan. Council directed staff to obtain separate proposals for the wayfinding and entry monument components and expressed greater interest in considering the entry monument signs. In response, staff obtained separate pricing and recommends awarding a design-build contract for the Entry Monument Signage Project. The October 8 staff report, included as Attachment 1, provides additional project history, scope, and selection details.
Separately, on September 10, 2026, Council directed staff to proceed with conceptual design of the historic William F. Cody-designed monument sign using up to $30,000 in reimbursement funding offered by the Palm Springs Preservation Foundation. 727
In addition to the recommended award of the Entry Monument Signage Project, staff seeks Council direction on whether to proceed with the citywide wayfinding signs and continue the William F. Cody monument sign effort.
Analysis
Entry Monument Signs
The proposed project includes final design, fabrication, and installation of three entry monument signs at the following locations:
Cook Street near Interstate 10
Monterey Avenue and Dinah Shore Drive
Washington Street and Fred Waring Drive
The signs would identify major gateways and reinforce Palm Desert’s visual identity, consistent with the approved Master Plan.
The project also includes relocating the Roadrunner public art monument to a location adjacent to the Desert Willow roundabout on Desert Willow Drive and relocating the Desert Gateway public art monument within the Desert Gateway shopping center. Supporting work includes foundations, structural and electrical components, landscaping and irrigation adjustments, grading, traffic control, and site restoration. The entry monument fee proposal is included as Attachment 2.
Proposed Design-Build Contract for Entry Monument Signs Staff recommends awarding a lump-sum design-build contract in the amount of $874,840, assigning final design and construction to Best Signs, providing the City with a single point of responsibility throughout the project. This approach allows engineering, utility, and other site-specific issues to be evaluated during final design before fabrication and installation.
The agreement establishes a total completion period of 334 calendar days after the initial notice to proceed, consisting of 120 calendar days for the construction document phase and an additional 214 calendar days for fabrication, installation, and final completion. The proposed agreement is included as Attachment 3.
Wayfinding Signs
The cost to proceed with the wayfinding improvements separately would be $1,559,214.06.
The scope includes 58 new signs and removal of 78 existing signs throughout Palm Desert.
Consistent with the approved Master Plan, the improvements would consolidate destination information, remove redundant signs, and replace existing signage with a coordinated design to help residents and visitors navigate to key destinations. Supporting fee information is included as Attachment 4.
The recommended contract award is limited to the Entry Monument Signage Project. If Council wishes to proceed with the wayfinding improvements, staff would prepare an amendment to the entry monument agreement for Council consideration. Any related funding needs would be addressed at that time.
728
William F. Cody Monument Sign
Council has recently considered several signage projects, including citywide wayfinding signs, entry monument signs, an El Paseo archway, El Paseo median monuments, and the historic William F. Cody-designed monument sign. These projects serve different purposes but collectively raise considerations regarding community identity, design consistency, project costs, and implementation priorities.
On September 10, 2026, Council directed staff to proceed with conceptual design of the historic William F. Cody-designed monument sign using up to $30,000 in reimbursement funding offered by the Palm Springs Preservation Foundation. The proposed effort includes documenting the original sign, preparing conceptual drawings, evaluating up to three potential locations, and developing a preliminary cost estimate. Council’s direction did not commit the City to constructing the sign. The September 10 staff report is included as Attachment 5.
A location has not yet been selected, and the project scope and cost remain preliminary. The conceptual design effort would help identify and evaluate potential sites and refine the anticipated project cost, currently estimated at $300,000 to $400,000. Actual costs would depend on the selected location, design, scope, and site-specific requirements.
Given Council’s recent consideration of these signage projects, staff is seeking direction on whether continued pursuit of the William F. Cody monument sign remains consistent with Council’s priorities. Council may direct staff to continue the conceptual design effort, defer the project, or discontinue further work. If Council wishes to continue, staff would return with the proposed grant and consultant agreements for consideration. Any future construction would require separate Council approval and identification of funding.
Environmental Review
The City has reviewed the project in accordance with the California Environmental Quality Act (CEQA) and recommends that the project is exempt from environmental review pursuant to Section 15303, Class 3 – New Construction or Conversion of Small Structures, of the State CEQA Guidelines. Class 3 applies to projects involving the construction and location of limited numbers of new, small structures that are unlikely to have a significant environmental impact.
The project consists of a design-build contract for the design, fabrication, and installation of three entry monument signs and relocation of two public art monuments, including associated foundations and minor site improvements. The project does not involve the construction or expansion of buildings or other substantial improvements and is not anticipated to result in significant environmental impacts.
Legal Review
This report has been reviewed by the City Attorney’s Office.
Financial Impact
Funds for the Entry Monument Signage Project are included in the approved FY 2026-27 Financial Plan and Ten-Year Capital Improvement Program (CIP) List. Funding is available from Bond Funds under Account No. 4514300-4400100. Therefore, there is no additional 729
financial impact to the General Fund with this action. The following table summarizes project budget and expenditure:
Description Budget Expenses Balance
FY 26/27 - 4514300-4400100 $1,199,203
Best Signs, Inc. $874,840
Contingency $200,000
Total $1,199,203 $1,074,840 $124,363
Direction regarding the citywide wayfinding signs would not authorize additional expenditures with this action. If Council wishes to proceed, staff will return with a proposed contract amendment and any related funding requests for consideration.
Direction regarding the William F. Cody monument sign would also not authorize additional expenditures with this action. If Council directs staff to continue, staff would return with the proposed agreements and a request to appropriate funds for conceptual design, with up to $30,000 anticipated to be reimbursed by the Palm Springs Preservation Foundation. Funding for final design and construction would be considered separately through a future budget process.
Attachments
1. Staff Report (October 8, 2026)
2. Entry Monument Signs Fee Proposal
3. Design-Build Agreement
4. Wayfinding Signs Fee Proposal
5. Staff Report (September 10, 2026)
730
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☒ Yes
☐ No
If yes, identify the project site: Proposed entry monument installations at Cook Street near Interstate 10, Monterey Avenue at Dinah Shore Drive, and Washington Street at Fred Waring Drive.
Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☐ Yes
☒ No
If yes, identify the applicant(s), appellant(s), party, or participant(s):
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 731
732
City of Palm Desert Staff Report
Meeting Date: October 8, 2026
Prepared By: Chris Gerry, Senior Project Manager
Department: Public Works
Subject: Award a Design-Build Contract to Best Signs, Inc., for Wayfinding and Entry Monument Sign Improvements (Project No. MST00003)
Recommendation
1. Award a Design-Build Contract to Best Signs, Inc., for Wayfinding and Entry Monument Sign Improvements in the amount of $2,434,054.06, plus a contingency of $500,000 for unforeseen expenses.
2. Authorize the City Attorney to make necessary non-monetary changes to the agreement.
3. Authorize the City Manager to execute the agreement and any written requests for amendments up to the $500,000 contingency amount, and any other documents necessary to effectuate this action, in accordance with Palm Desert Municipal Code Section 3.30.170(B).
4. Authorize the City Manager to execute the Notice of Completion (NOC) and the City Clerk to file the NOC upon satisfactory completion of the Project.
Executive Summary
The City of Palm Desert (City) has been working for several years to update its wayfinding and entry monument signage. Following the City Council’s approval of the Citywide Wayfinding and Monument Sign Master Plan (Master Plan), the next step is to complete final design and construction of the improvements. Staff recommends awarding a design-build contract to Best Signs, Inc., to complete this work.
The proposed work includes 58 new wayfinding signs, three new entry monument signs, removal of 78 existing wayfinding signs, and relocation of two public art monuments. Best Signs received the highest overall ranking through the City’s competitive selection process.
The proposed contract amount is $2,434,054.06, with final completion within 457 calendar days (15 months) after the initial notice to proceed.
Background
In March 2023, the City Council held a study session on citywide wayfinding and entry monument signage and directed staff to develop a new wayfinding master plan and design three entry monument signs. Wayfinding signage assists residents and visitors in navigating to key destinations, while entry monument signage identifies major gateways and reinforces Palm Desert’s visual identity. Since then, the City has advanced this effort through coordination with City departments, advisory bodies, and the broader community across multiple phases. A summary of prior meetings and key milestones is provided as Attachment 1. 733
On January 22, 2026, the City Council approved the Master Plan. The Master Plan establishes the design standards, sign types, locations, destination hierarchy, and messaging that will govern final design and construction. The approved Master Plan is provided as Attachment 2.
Analysis
Project Scope
The project will update wayfinding signage at locations throughout Palm Desert and includes 58 new wayfinding signs and removal of 78 existing wayfinding signs. In addition, the project includes installing three new entry monument signs at Cook Street near Interstate 10, Monterey Avenue and Dinah Shore Drive, and Washington Street and Fred Waring Drive.
The project also includes relocating the Roadrunner public art monument from Washington Street and Fred Waring Drive to a location adjacent to the Desert Willow roundabout on Desert Willow Drive. The Desert Gateway public art monument will be relocated to another location within the Desert Gateway shopping center. Supporting work includes foundations, structural and electrical components, landscaping and irrigation adjustments, grading, traffic control, and site restoration.
During final design, Best Signs will verify utilities, field conditions, structural requirements, and constructability and prepare construction documents for City review. Based on this review, exact sign placement and other site-specific refinements may be adjusted with City approval.
Selection Process
On April 16, 2026, the City released Request for Proposals No. 2026-RFP-016 for design-build services to implement the approved Master Plan. Four proposals were received by the deadline of June 4, 2026. The proposals were evaluated based on firm qualifications and relevant experience, the proposed project team, technical approach and design-build integration, and the fee proposal. The evaluation committee scored the four proposals as follows:
Firm Aggregate Score
Best Signs, Inc. 93.75
Monarka Development Corporation 81.13
Outdoor Dimensions 77.38
Premier Sign Service, Inc. 55.38
Following evaluation of the written proposals, the two highest-ranked firms were invited to interviews in August 2026. The interviews provided an opportunity to further evaluate each firm’s understanding of the project, proposed approach, ability to manage design and construction as an integrated team, and strategy for delivering the improvements within the available budget.
Best Signs was unanimously identified as the highest-ranked firm based on its specialized signage expertise, extensive local experience, strong references, and understanding of the project. The Coachella Valley-based firm has completed significant municipal wayfinding and monument-sign projects in neighboring cities, including La Quinta, Rancho Mirage, Indio, Indian Wells, Coachella, Palm Springs, and Desert Hot Springs. 734
Best Signs also went beyond the minimum proposal requirements by conducting preliminary site, technical, and constructability reviews and identifying issues warranting further evaluation during final design. This proactive approach, combined with the firm’s local knowledge and integrated design, fabrication, and installation capabilities, distinguished Best Signs as the firm best qualified to complete the project.
Proposed Design-Build Contract
The proposed agreement is a lump-sum design-build contract in the amount of $2,434,054.06.
This approach assigns final design and construction to Best Signs under one agreement, providing the City with a single point of responsibility throughout the project. It also allows engineering, utility, and other site-specific issues to be addressed before the signs are fabricated.
The agreement requires completion of the construction document phase within 120 calendar days and final completion within 457 calendar days (15 months) after the initial notice to proceed. Because the work will occur at numerous locations throughout Palm Desert, staff recommends a $500,000 contingency for unforeseen site conditions, utility conflicts that could not reasonably be identified before construction, and other City-authorized changes.
Environmental Review
The City of Palm Desert has reviewed the project in accordance with the California Environmental Quality Act (CEQA) and recommends that the project is exempt from environmental review pursuant to Section 15303, Class 3 – New Construction or Conversion of Small Structures, of the State CEQA Guidelines. Class 3 applies to projects involving the construction and location of limited numbers of new, small structures that are unlikely to have a significant environmental impact. The project consists of a Citywide design build contract for the design, fabrication, and installation of City monument and directional signs, including associated foundations and minor site improvements. The project does not involve the construction or expansion of buildings or other substantial improvements and is not anticipated to result in significant environmental impacts.
Legal Review
This report has been reviewed by the City Attorney’s Office.
Financial Impact
Funds for the Wayfinding and Monument Signage Improvements Project are included in the approved FY 2026-27 Financial Plan and Ten-Year Capital Improvement Program (CIP) List.
Funding is available from Measure A Funds, Account No. 2134300-5000910, and Bond Funds, Account No. 4514300-4400100. Therefore, there is no additional financial impact to the general fund with this action.
The following table summarizes project budget and expenditure:
735
Description Budget Expenses Balance
Contract Carryovers - 2134300-5000910 $167,500
FY 26/27 - 2134300-5000910 $1,825,000
FY 26/27 - 4514300-4400100 $1,199,203
*Best Signs, Inc. $2,434,054
*Contingency $500,000
Design Wayfinding Master Plan – A46980 $87,500
Contingency – A46980 $20,000
Design Entry Monument – A47210 $55,000
Contingency – A47210 $5,000
William Cody Monument Design $20,000
Total $3,191,703 $3,121,554 $70,149
*Current Request
Attachments
1. Project History Summary and Key Milestones
2. Citywide Wayfinding and Monument Sign Master Plan
3. Best Signs, Inc., Proposal
4. Design-Build Agreement – will be provided prior to the meeting 736
Conflict of Interest Awareness Checklist
Note: This checklist is informational only and does not constitute a legal determination. Each Councilmember remains responsible for identifying, disclosing, and evaluating any disqualifying interests under the Political Reform Act and applicable FPPC regulations.
1. Site-Specific Property Interest
Does this item involve a project site or other identifiable real property? ☐ Yes
☒ No
If yes, identify the project site:
Councilmembers should consider whether they own, lease, or hold interests in real property within 1,000 feet of the project site. (Gov. Code § 87103(b); FPPC Reg. 18702.2).
2. SB 1439 / Gov. Code § 84308 Applicability (Campaign Contributions) Does this item involve a license, permit, other entitlement for use, or a contract or franchise agreement that is not competitively bid, a labor agreement, or a personal employment contract?
☒ Yes
☐ No
If yes, identify the applicant(s), appellant(s), party, or participant(s): Best Signs, Inc.
Councilmembers should review campaign contributions received within the prior 12 months from parties or participants to the proceeding and must not accept contributions over $500 from those parties for 12 months following the final decision. (Gov. Code § 84308). 737
738
739
740
1 DESIGN-BUILD CONTRACT BETWEEN
CITY OF PALM DESERT AND BEST SIGNS, INC.,
FOR THE ENTRY MONUMENT SIGNAGE PROJECT
1. Parties and Date. This Design-Build Contract (“Contract”) is made and entered into on NOVEMBER 12, 2026, by and between the City of Palm Desert, a municipal corporation organized under the laws of the State of California with its principal place of business at 73-510 Fred Waring Drive, Palm Desert, California 92260-2578 (“City”) and BEST SIGNS, A CORPORATION, with its principal place of business at 1550 SOUTH GENE AUTRY TRAIL, PALM SPRINGS, CA 92264, CSLB #524483 ("Contractor"). The City and Contractor are sometimes individually referred to herein as "Party" and collectively as "Parties."
2. Recitals.
2.1 Project.
2.1.1 The City is in need of a Contractor to provide design-build services for the following project: Entry Monument Signage Project (hereinafter referred to as “the Project”).
2.1.2 City desires to engage a single design-build entity to provide turnkey design, engineering, fabrication, and construction services for the Entry Monument Signage Project (“Project”), and to assume full responsibility for complete delivery of the Project in accordance with this Contract. The Project includes three new City entry monument signs, relocation of two existing public art monuments, and associated design, engineering, permitting, fabrication, construction, and site improvements. Citywide vehicular and pedestrian wayfinding signs, including removal or replacement of existing wayfinding signs, are excluded from this Contract.
2.1.3 Contractor submitted a Proposal in response to the City’s Request for Proposals, which was evaluated and selected as providing the best value to the City.
2.1.4 Contractor desires to perform and assume responsibility for the provision of the design and construction services, and such other services as required by the City on the terms and conditions set forth in this Contract and Contractor represents that it is experienced in providing professional planning, design, and construction services to public entities, is appropriately licensed in the State of California to perform such services, and is familiar with the Scope of Work and that it and its subcontractors are duly registered with the Department of Industrial Relations to perform public works in the State of California.
3. Incorporation of Contract Documents.
3.1. The above referenced recitals are true and correct and are incorporated into this Contract by this reference. This Contract includes and hereby incorporates in full 741
2 by reference the following Contract Documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:
(a) City-approved Change Orders
(b) This Design-Build Contract
(c) Completed and City-approved Construction Documents
(d) Attachment 1 to this Contract – Scope of Work
(e) Attachment 1-1 to this Contract – Contractor’s Proposal (f) Attachment 2 to this Contract - General Conditions
(g) Attachment 3 to this Contract – Special Conditions
(h) Attachment 4 to this Contract – Performance Bond
(i) Attachment 5 to this Contract – Payment Bond
(j) Attachment 6 to this Contract – Rate Schedule
(k) Attachment 7 to this Contract – Workers’ Compensation Certification (l) Request for Proposal (RFP), addenda, attachments and appendices The RFP, addenda, attachments, appendices, and Bridging Documents are incorporated only to the extent applicable to the Entry Monument Signage Project described in Attachment 1. Requirements concerning citywide vehicular or pedestrian wayfinding signs, including their design, fabrication, installation, removal, or replacement, are excluded. References to the combined wayfinding and monument signage program do not expand the Work under this Contract.
Attachment 1-1 is incorporated only to the extent applicable to the Entry Monument Signage Project. References therein to wayfinding work and the original combined-project budget are excluded. The Contract Price and Contract Time stated in this Contract supersede inconsistent pricing and scheduling information in Attachment 1-1. Proposal qualifications or requests for exceptions that conflict with the express requirements of this Contract or the General Conditions do not modify those requirements.
4. Contractor’s Basic Obligations; Compensation.
4.1 Contractor promises and agrees, at its own cost and expense, to furnish to the City all design, engineering, fabrication, construction services, labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project as described in the Contract Documents (hereinafter the “Scope of Work” or “Work”).
4.2 City shall pay to Contractor, as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents and including all applicable taxes and costs, the sum of EIGHT HUNDRED SEVENTY FOUR THOUSAND EIGHT HUNDRED FORTY DOLLARS ($874,840) (“Contract Price”).
Payment shall be made as set forth in the General Conditions.
4.3 Unless otherwise expressly provided in the Contract Documents, the Contract Price is a lump sum amount and shall include all costs and expenses required 742
3 to fully design, engineer, fabricate, and construct the Project in accordance with the Contract Documents, including all costs associated with design development, coordination, refinement, and completion of the Project consistent with the Contract Documents, whether or not such work is expressly identified.
5. Change Orders; Adjustments to Contract Price or Contract Time.
5.1 Authorization Required. Any change in Scope of Work, method of performance, nature of materials, Contract Price, or Contract Time shall not be paid for, approved, or accepted unless such change is authorized in advance and in writing by a valid Change Order executed in accordance with the Contract Documents.
5.2 Condition Precedent; Waiver. Strict compliance with all notice and Change Order Request procedures set forth in the Contract Documents is a condition precedent to any adjustment of the Contract Price or Contract Time. Failure of Contractor to timely submit written notice and a Change Order Request in accordance with the Contract Documents shall constitute a waiver of Contractor’s right to any such adjustment.
6. Standard of Care.
6.1 Contractor’s performance shall be consistent with the standards set forth in the Contract and the General Conditions. Contractor warrants to City that all Design Work will be performed in accordance with the standard of care ordinarily exercised by design professionals practicing under similar circumstances and conditions for projects of similar type, scope, quality, and complexity utilizing the design-build contracting mode. Contractor warrants to City that all labor, materials, equipment, and furnishings used in, or incorporated into, the Construction Work will be of good quality, new (unless otherwise required or permitted by the Contract Documents), and that all work will be free of liens, claims, and security interests of third parties; that the work will be free from defects and will conform with the requirements of the Contract Documents.
Contractor shall supervise, inspect, and direct the Project competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Project in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of design and construction of the Project. Contractor shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions caused by Contractor’s failure to comply with the standard of care provided for herein. Contractor shall be fully responsible for the adequacy, completeness, and coordination of all design and construction performed under this Contract.
7. Period of Performance; Liquidated Damages.
7.1 Time is of the essence in the performance of the Work. The Contractor shall perform and complete all Work required by the Contract Documents, including design, permitting, fabrication, and construction, and shall achieve Final Completion of the Project 743
4 no later than Three Hundred Thirty Four (334) calendar days from the date specified in the initial Notice to Proceed issued for the Construction Document Phase (“Project Completion Date”). The Three Hundred Thirty Four (334) calendar day Contract Time includes both the Construction Document Phase and the Construction Phase.
7.2 Contractor shall be solely responsible for coordinating and sequencing all phases of the Work to ensure achievement of Final Completion within the Contract Time.
Issuance of a separate Notice to Proceed for the Construction Phase shall not extend, restart, or otherwise modify the Project Completion Date unless expressly provided in a written Change Order executed in accordance with the Contract Documents.
7.3. For purposes of this Contract, “Final Completion” shall mean completion of all Work, including correction of deficient or nonconforming Work, completion of all punch list items, delivery of all required closeout documents, and written acceptance of the Work by the City in accordance with the Contract Documents.
7.4 Pursuant to Government Code Section 53069.85 and subject to the Force Majeure clause set forth herein, the Contractor agrees that it shall be liable to the City for liquidated damages in the amount of One Thousand Dollars ($1,000.00) per calendar day for each and every calendar day beyond the Project Completion Date as adjusted by extensions of Contract Time to which Contractor is entitled under the Contract Documents that Final Completion of the Project has not been achieved to the extent the delay is attributable to Contractor or its Subcontractors or Suppliers. Liquidated damages shall not be assessed for periods of excusable delay for which Contractor is entitled to an extension of Contract Time under the Contract Documents, subject to the applicable notice and substantiation requirements. Concurrent delays shall be evaluated under the Contract’s concurrent-delay provisions. If Final Completion is not achieved by the Project Completion Date, it is understood that the City will suffer damage, and that it is and will be difficult and/or impossible to ascertain and determine the actual damage which the City will sustain by reason of the Contractor’s failure to complete the Work within the time required. Therefore, the Contractor shall pay to the City the stipulated sum as fixed and liquidated damages and not as a penalty. Any money due or to become due the Contractor may be retained to cover such liquidated damages.
8. Approval of Design; Commencement of Construction.
8.1 The Scope of Work shall consist of two phases: the Construction Document Phase and the Construction Phase. The City shall issue a Notice to Proceed for the Construction Document Phase and may issue one or more Notices to Proceed for the Construction Phase, including limited Notices to Proceed for approved portions of the Work as provided in Section 8.6.
8.2 The Contractor shall commence the Construction Document Phase after receipt of City’s Notice to Proceed and complete the Construction Document Phase work within One Hundred Twenty (120) calendar days of the Notice to Proceed date. The design shall consist of preparation of the Construction Documents as set forth in the 744
5 General Conditions. The Bridging Documents establish the City’s design intent, performance requirements, and minimum project requirements. Contractor shall be fully responsible for developing the design and delivering a complete Project consistent with such requirements.
Contractor shall submit the following to City for approval:
(a) Schematic Design;
(b) 60% Construction Documents;
(c) 90% Construction Documents; and
(d) 100% Construction Documents.
8.3 Contractor may submit the required design documents by sign type or other discrete work package, in a sequence approved by City. Each package shall include the applicable design submissions identified above and sufficient information for City to evaluate its coordination with the remainder of the Project. Separate review or approval of a package does not alter the 120-day deadline in Section 8.2 or authorize fabrication or construction except as provided in Section 8.6.
8.4 The City’s review and approval of the design shall not relieve the Contractor from its responsibilities under the Contract, provided that such review and approval is not unreasonably delayed or withheld. Such review shall not be deemed an approval or waiver by the City of any deviation from, or of the Contractor’s failure to comply with, any provision or requirement of the Contract Documents, unless such deviation or failure has been specifically identified in writing by the Contractor and expressly approved in writing by the City. City review or approval of Construction Documents shall not constitute verification of design adequacy, constructability, code compliance, structural integrity, or engineering sufficiency. Nothing in this Section precludes an adjustment to the Contract Price or Contract Time, in accordance with the Contract’s change order provisions, for a City-directed change to sign content, size, or location after the City has approved that element in writing.
8.5 The Contract Schedule shall indicate the time for the City to review the proposed Construction Documents and shall provide a reasonable time for review of same, not less than ten (10) calendar days. Contractor shall not be entitled to any increase in Contract Price or extension of Contract Time for delays occurring during the Construction Document Phase, except to the extent such delay is caused solely by the City’s failure to perform its review within the time periods expressly set forth in the Contract Documents.
8.6 Contractor shall not commence fabrication or construction of any portion of the Work until the City has issued a written Notice to Proceed authorizing that work. The City may issue a limited Notice to Proceed for a specified sign type or other portion of the Work after approving the applicable Construction Documents in writing. Each limited Notice to Proceed shall identify the work authorized and shall not authorize work requiring a permit before the applicable permit is obtained. Issuance of a limited or subsequent Notice to Proceed shall not extend, restart, or otherwise modify the Project Completion 745
6 Date or Contract Time except through a written Change Order.
8.7 If the City issues a limited Notice to Proceed under Section 8.6 before approving the 100% Construction Documents for the entire Project, Contractor shall remain responsible for coordinating the authorized work with the remaining design and construction work. The limited Notice to Proceed shall not relieve Contractor of responsibility for errors, omissions, or conflicts in its design documents or entitle Contractor to an adjustment in Contract Price or Contract Time arising from them.
9. City’s Representative
9.1 The City hereby designates Senior Project Manager, Chris Gerry, or his or her designee, as the person to act as its representative for the performance of this Contract (“City’s Representative”). The City’s Representative shall be authorized to act as liaison between City and the Contractor in the administration of this Contract and all work on the Project. The City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract, including for the purpose of approving the design. City may designate new and/or different individuals to act as City’s Representative from time to time upon written notice to the Contractor. The City’s Representative shall not have authority to approve Change Orders, amendments to the Contract, increases in Contract Price, or extensions of Contract Time unless expressly authorized in writing by the City Manager or City Council.
10. Contractor Representative.
10.1 The Contractor hereby designates Jim R. Cross, or his or her designee, to act as its representative for the performance of this Contract (“Contractor Representative”). Contractor’s Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Contract. Contractor’s Representative shall supervise and direct all work on the Project, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the work pursuant to this Contract.
11. Contractor’s License and Registration.
11.1 The Contractor shall have only appropriately licensed contractors performing work on the Project as required by the Business and Professions Code. The Contractor (<<License No.>>) shall act as the licensed contractor for the Project. Contractor shall perform all services required under the Contract Documents in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals qualified to perform such services in the same discipline in the State of California, and the Contractor shall be fully responsible to the City for any damages and/or delays to the Project as specified in the Contract. The licensed contractor shall be registered with the Department of Industrial Relations to perform public work (DIR Registration No. <<INSERT>>).
746
7 12. Contractor’s Design Professional.
12.1 The Contractor shall name a specific person to act as the Design Professional as described in the General Conditions, subject to the approval of the City. The Contractor hereby designates <<Name, Title>> (<<License No.>>) to act as the Design Professional for the Project. Contractor’s Design Professional shall perform all services required under the Contract Documents in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals qualified to perform such services in the same discipline in the State of California, and the Contractor shall be fully responsible to the City for any damages and/or delays to the Project as specified in the indemnification provisions of the Contract. Any change in the Design Professional shall be subject to the City’s prior written approval, which approval shall not be unreasonably withheld. The new Design Professional shall be of at least equal competence as the prior Design Professional. In the event that City and Contractor cannot agree as to the substitution of a new Design Professional, the City shall be entitled to terminate this Contract as described in the General Conditions.
13. Authority of Signatories.
13.1 The persons executing this Contract on behalf of their respective Parties represent and warrant that they have the authority to do so under law and from their respective Parties.
[SIGNATURES ON FOLLOWING PAGE]
747
8 SIGNATURE PAGE TO CONTRACT FOR DESIGN-BUILD
BY AND BETWEEN THE CITY OF PALM DESERT
BEST SIGNS, INC.
IN WITNESS WHEREOF, each of the Parties has caused this Agreement to be executed on the day and year first above written.
Office Use:
Quality Check Insurance
Review
City Clerk Contracts Initial Final Bonds
CITY OF PALM DESERT
_________________________________
Chris Escobedo
City Manager
Attest:
__________________________________
Anthony J. Mejia
City Clerk
Approved as to form:
_________________________________
Isra Shah
City Attorney
BEST SIGNS, A CORPORATION
__________________________________
Jim R. Cross
President
__________________________________
Johnathan R. Cross
Chief Financial Officer
CSLB #524483, C45, C-61/D42, C10
Contractor’s License Number and
Classification
1000022732
DIR Registration Number
748
9 749
A1-10
ATTACHMENT 1
SCOPE OF WORK
1. Project Overview
The Contractor shall provide final design, engineering, fabrication, installation, and construction services for the Entry Monument Signage Project.
The Project includes three new City entry monument signs at Cook Street near Interstate 10, Monterey Avenue and Dinah Shore Drive, and Washington Street and Fred Waring Drive. The Project also includes relocation of the Roadrunner public art monument to a location adjacent to the Desert Willow roundabout on Desert Willow Drive and relocation of the Desert Gateway public art monument within the Desert Gateway shopping center. Citywide vehicular and pedestrian wayfinding improvements are excluded.
The adopted Wayfinding and Monument Master Plan (“Master Plan”) establishes the City’s approved design framework, materials palette, typography, and overall design character and shall serve as the governing design standard for this project. The Contractor awarded the Contract shall implement the Master Plan faithfully while refining site-specific details necessary to achieve constructible, durable, and code-compliant improvements; provided, however, that such refinement shall not relieve the Contractor of responsibility to deliver a complete Project for the agreed Contract Price.
Only those portions of the Master Plan applicable to the entry monument signs and associated improvements govern the Work under this Contract. Wayfinding sign schedules, quantities, locations, messaging, and installation or removal requirements are excluded.
The Scope of Work includes all civil, structural, electrical, landscape, irrigation, grading, and site improvements necessary to deliver complete and fully operational installations consistent with the Master Plan. The Contractor shall provide all labor, materials, equipment, supervision, coordination, and incidental components necessary to deliver a complete, fully operational, and code-compliant Project consistent with the adopted Master Plan and Contract Documents.
No additional compensation shall be granted for Work that is reasonably inferable from the Contract Documents, industry standards, or necessary to achieve the intended function of the Project, even if not expressly described herein, provided such work is reasonably inferable based on the level of detail reasonably expected at the time of proposal. The Contractor acknowledges that the Contract Price includes all such Work.
The Project shall be developed using a design-to-budget approach. Contractor shall collaborate with the City during the design phase to evaluate alternatives, materials, systems, and sequencing to align the Project scope with the City’s budget priorities. 750
A1-11
The Project may be implemented in prioritized phases or adjusted in scope to align with available funding. The Contractor shall assist the City in identifying prioritization strategies and sequencing approaches to maximize the effectiveness of available project funds.
The City reserves the right to include, modify, defer, or exclude elements of the Project based on cost, value, and operational considerations, provided the final Project remains consistent with the Contract Documents.
2. Project Initiation and Coordination
Review the portions of the adopted Master Plan applicable to the entry monument signs and public art relocations, together with relevant background materials Conduct kickoff meetings with City staff.
Establish coordination protocols, design and construction milestones, and decision points.
Coordinate with City representatives, property owners, artists, utility providers, regulatory agencies, and other stakeholders as required. Contractor shall submit a detailed project schedule following Notice to Proceed, identifying design milestones, permitting durations, fabrication lead times, construction sequencing, critical path activities, and anticipated final completion. Contractor shall actively support value analysis throughout the design process and shall identify alternative materials, systems, or design approaches that may reduce cost, improve durability, or enhance long-term maintenance. Contractor shall present options to the City, including associated cost impacts, to support informed decision-making.
Contractor shall work collaboratively with the City throughout the design process, incorporating City feedback and participating in regular coordination meetings to review design progress, cost alignment, and project priorities.
3. Site Verification, Survey, and Utility Coordination
Perform field verification of proposed entry monument sign locations and existing and proposed public art monument locations.
Provide surveying services necessary to support design and construction, including horizontal and vertical control.
Evaluate site-specific constraints including visibility, access, geometry, constructability, drainage, utilities, traffic considerations, and ADA compliance. Conduct utility coordination and incorporate utility constraints into final design. The Contractor shall verify existing field conditions and assume responsibility for coordination and resolution of conflicts reasonably discoverable through customary investigation.
Subsurface utility engineering or potholing shall be included only as required to support approved improvements.
The Contractor shall coordinate with applicable utility providers for all electrical service requirements associated with illuminated signage, including service 751
A1-12
upgrades, new connections, metering, and utility clearances as required to deliver fully operational illuminated signage.
Contractor shall perform all site investigations reasonably necessary to verify subsurface and field conditions affecting the Work.
Contractor shall bear the risk of conditions that could have been identified through customary investigation and shall not be entitled to additional compensation or extension of Contract Time for such conditions.
4. Permitting and Regulatory Approvals
Obtain all permits, encroachment approvals, traffic control approvals, electrical permits, utility clearances, and other regulatory approvals necessary to complete the work.
Prepare and submit all required documentation to applicable agencies and incorporate permit conditions into final design and construction. Coordinate inspections required by permitting authorities.
5. Public Art Monument Relocation
Provide planning, coordination, design, and construction services for relocation of existing public art monument signs, including:
o Deinstallation
o Transportation
o New foundations
o Electrical and lighting
o Installation
o Site restoration
Services shall include coordination with artists and property owners, constructability review, and full integration with fabrication and installation activities.
6. Design Development and Final Design
Advance entry monument sign designs consistent with the applicable portions of the adopted Master Plan.
Finalize sign locations, orientations, foundations, structural systems, lighting systems, landscaping interfaces, materials, and finishes. Prepare site-specific landscape design concepts and construction documents for monument locations, including planting layouts, irrigation modifications, grading adjustments, decorative rock or groundcover treatments, and hardscape integration necessary to deliver cohesive and visually integrated improvements. Prepare fabrication-ready drawings, details, structural calculations, and specifications.
Develop City-directed additive or deductive options that do not materially alter approved sign families or design character.
Final entry monument sign lettering, logos, and other content shall be refined during design development in coordination with the City prior to fabrication. 752
A1-13
7. Performance Standards
All signs and structural components shall meet the following minimum performance criteria:
o Structural design consistent with applicable California Building Code wind load requirements and site-specific conditions.
o Durable materials suitable for desert climate exposure, including high UV conditions and temperature fluctuations.
o Corrosion-resistant materials and coatings appropriate for long-term outdoor installation.
o Illumination systems (where applicable) designed for consistent nighttime visibility and energy efficiency.
o Major structural components shall be designed for a minimum service life of twenty (20) years under normal operating and environmental conditions. o Landscape improvements shall be designed for durability, water efficiency, proper drainage, and long-term maintainability consistent with City standards and desert climate conditions.
o Signage finishes shall incorporate graffiti-resistant coatings suitable for desert exposure conditions.
o Fasteners, access panels, and mounting systems shall incorporate tamper-resistant or anti-theft hardware where reasonably appropriate. Signage and associated improvements shall be designed to allow safe and efficient maintenance access using standard City maintenance equipment unless otherwise approved by the City.
8. Cost Control and Project Management
Manage and control project costs throughout design, fabrication, and construction. Identify cost drivers and opportunities for efficiencies without degradation of approved design quality, durability, or long-term maintenance performance. Deliver the project within the Contract Price, subject only to City-approved changes.
The Contractor shall continuously evaluate design decisions against budget impacts and shall promptly notify the City if projected costs indicate potential exceedance of available funding.
9. Fabrication and Construction
Fabrication and installation of entry monument signage. Deinstallation and relocation of public art monument signs. Foundations, structural supports, electrical systems, lighting systems, and site restoration.
Traffic control, coordination, and site management.
Provide record drawings, maintenance manuals, and recommended maintenance schedules for all installed components prior to final acceptance. Construct all approved landscape improvements associated with entry monument installations and public art monument relocations, including planting, irrigation installation or modification, grading, decorative rock or groundcover placement, hardscape restoration or replacement, and full restoration of disturbed areas. 753
A1-14
Work shall be sequenced to minimize disruption to public navigation, traffic operations, and adjacent businesses.
The Contractor may self-perform signage fabrication or use a qualified signage fabrication subcontractor. The signage fabricator shall demonstrate experience in fabricating and installing large-scale municipal entry monument signage of comparable size, complexity, materials, and environmental exposure conditions.
The Contractor shall identify the signage fabricator and provide representative project examples demonstrating comparable qualifications and experience. The Contractor may self-perform portions of the work or utilize subcontractors, provided all work is performed in accordance with applicable licensing requirements and approved by the City as required under the Contract.
10. Construction-Phase Design Support and Integration
Provide all design services necessary to support construction under a unified design–build delivery model, including internal coordination between design and construction personnel.
Prepare and manage submittals, shop drawings, fabrication details, and issue resolution without reliance on separate City design consultants. City shall provide Contractor with existing drawings and known requirements concerning the art monuments that are in City’s possession. Contractor remains responsible for developing the removal and reinstallation details in coordination with City and the artists.
Participate in coordination meetings as requested by the City.
11. Warranty
Provide a minimum one (1) year warranty for workmanship and installation from the date of the City’s written final acceptance of the work. Provide a minimum five (5) year warranty on finishes and coatings against peeling, cracking, excessive chalking, corrosion, or excessive fading under normal exposure conditions.
Where manufacturer warranties for finishes, coatings, lighting components, electrical systems, or specialty materials exceed the minimum warranty periods stated herein, such longer manufacturer warranties shall be assigned to the City upon project completion.
Provide all manufacturer warranties for lighting components, electrical systems, and specialty materials and assign such warranties to the City upon project completion.
Warranty periods shall commence upon the City’s written final acceptance of the work. Corrective work required during the applicable warranty period shall be performed at no cost to the City.
Warranty coverage shall not apply to damage resulting from vandalism, vehicular impact, Acts of God, or improper maintenance performed by others. The one (1) year workmanship warranty shall not limit any longer manufacturer warranties or statutory rights available to the City.
754
A1-15
12. City Authority and Discretion
The City retains final approval authority over:
o Sign locations and relocations
o Sign quantities
o Messaging and content
o Materials and finishes
o Acceptance of design deliverables
o Scope adjustments, additions, or deletions
The City may modify, defer, add, or eliminate elements of the project to remain within available funding and policy direction.
Any changes by City including any additions, deletions, modifications, or revisions, shall be subject to the Change Order process set forth in the General Conditions, with the Contract Price and/or Contract Time adjusted accordingly.
13. Budget and Authorization
The Contractor shall sequence and prioritize work as necessary to ensure delivery within the established budget. The Contractor shall deliver the project within the agreed-upon Contract Price, subject only to City-approved changes in scope. 755
A1-3-16
ATTACHMENT 1-1
PROPOSAL
PROPOSAL IS FOR ONLY THE ENTRY MONUMENT SIGNS
756
A1
-3-17
757
A1
-3-18
758
A1
-3-19
759
A1
-3-20
760
A1
-3-21
761
A1
-3-22
762
A1
-3-23
763
A1
-3-24
764
A1
-3-25
765
A1
-3-26
766
A1
-3-27
767
A1
-3-28
768
A1
-3-29
769
A1
-3-30
770
A2-31
ATTACHMENT 2
GENERAL CONDITIONS
1. DEFINITIONS AND TERMINOLOGY
1.1 Defined Terms.
1.1.1 Wherever used in the Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined below, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.
1.1.1.1 Act of God -- Act of God is an earthquake of magnitude 3.5 or higher on the Richter Scale or a tidal wave.
1.1.1.2 Additional Work -- New or unforeseen work will be classified as “Additional Work” when City’s Representative determines that it is not covered by the Contract.
1.1.1.3 Applicable Laws -- The laws, statutes, ordinances, rules, codes, regulations, permits, and licenses of any kind, issued by local, state or federal governmental authorities or private authorities with jurisdiction (including utilities), to the extent they apply to the Work.
1.1.1.4 Application for Payment -- The form acceptable to City’s Representative which is to be used by the Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents.
1.1.1.5 Bridging Documents – The documents prepared or provided by the City to establish the Project’s design intent, performance requirements, and scope parameters. The Bridging Documents include, without limitation, the following:
(i) Supporting Attachment B – Wayfinding and Monument
Sign Master Plan (Entry Monument Work Only);
(ii) Supporting Attachment C – Roadrunner Relocation –
Current and Proposed Location; and
(iii) Supporting Attachment D – Desert Gateway Rock
Sculpture Relocation – Current and Requested Location.
771
A2-32
The applicable portions of the Bridging Documents define the minimum requirements of the Entry Monument Signage Project, subject to the scope exclusions stated in this Contract. Contractor shall be responsible for completing the design and construction necessary to deliver a complete and fully functional Project consistent with such requirements, whether or not every detail is expressly shown or specified.
1.1.1.6 Certificate for Payment -- The form signed by City’s Representative attesting to the Contractor’s right to receive payment for certain completed portions of the Work on the Project in accordance with Article 12.
1.1.1.7 Change Order (“CO”) -- A document that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Project Completion Date, issued on or after the Effective Date of the Contract, in accordance with the Contract Documents and in the form contained in the Contract Documents.
1.1.1.8 Change Order Request (“COR”) -- A request made by the Contractor for an adjustment in the Contract Price and/or Project Completion Date as the result of a Contractor-claimed change to the Work.
1.1.1.9 Claim -- A demand or assertion by City or Contractor seeking an adjustment of the Contract Price or Project Completion Date, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim.
1.1.1.10 Construction Documents -- The plans and Technical Specifications prepared by the Contractor for the Project and approved by City. The Construction Documents shall set forth in detail all items necessary to complete the construction (other than such details customarily provided by others during construction) of the Project in accordance with the Contract Documents.
Following commencement of the Construction Phase,
Construction Documents become part of the Contract Documents upon their completion and approval by City. All amendments and modifications to the Construction Documents must be approved by City in writing.
1.1.1.11 Construction Documents Phase -- The first phase of the Work and will commence with the issuance of the Notice to Proceed.
1.1.1.12 Construction Phase -- The second phase of the Work. The Construction Phase may commence for a specified portion of the 772
A2-33
Work upon the City’s approval of the applicable Construction Documents and issuance of a written Notice to Proceed for that portion under Section 8.6, provided such approval is not unreasonably delayed or withheld. Other portions of the Work may commence only when separately authorized by the City.
1.1.1.13 Construction Work -- That portion of the Work on the Project consisting of the provision of labor, materials, furnishings, equipment and services in connection with the construction of the Project as set forth in the Contract Documents.
1.1.1.14 Contract -- The entire integrated written agreement between City and Contractor concerning the Work. “Contract” may be used interchangeably with “Agreement” in the Contract Documents.
The Contract supersedes prior negotiations, representations, or agreements, whether written or oral, and includes all Contract Documents.
1.1.1.15 Contract Documents -- The documents listed in Section 3.1 of the Contract. Some documents provided by City, including but not limited to reports and drawings of subsurface and physical conditions are not Contract Documents.
1.1.1.16 Contract Times -- The number of days or the dates stated in the Contract Documents and Project Schedule to achieve defined Milestones, if any, and to complete the Work so that it is ready for final payment.
1.1.1.17 Critical Supply Shortage -- An unusual shortage in materials that is (a) supported by documented proof that Contractor made every effort to obtain such materials from all available sources; (b) such shortage is due to the fact that such materials are not physically available from single or multiple sources or could have been obtained only at exorbitant prices entirely inconsistent with current and standard rates taking into account the quantities involved and the usual industry practices in obtaining such quantities; and (c) such shortages and the difficulties in obtaining alternate sources of materials could not have been known or anticipated by Contractor at the time it submitted its bid or entered the Contract. Market fluctuations in prices of materials, whether or not resulting from a Force Majeure Event, does not constitute a Critical Supply Shortage.
1.1.1.18 Day -- A calendar day of 24 hours measured from midnight to the next midnight.
773
A2-34
1.1.1.19 Defective Work -- Work that is unsatisfactory, faulty, or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard, test, or approval referenced in the Contract Documents.
1.1.1.20 Demobilization -- The complete dismantling and removal by the Contractor of all of the Contractor’s temporary facilities, equipment, and personnel at the Site.
1.1.1.21 Contractor -- The individual or entity with which City has contracted for performance of the Work.
1.1.1.22 Contractor Representative -- The person or firm identified as the primary contact person and representative of the Contractor as designated in the Contract and who shall not be changed without prior written consent of City.
1.1.1.23 Design Materials -- Any and all documents, shop drawings, electronic information, including computer programs and computer generated materials, data, plans, drawings, sketches, illustrations, specifications, descriptions, models and other information developed, prepared, furnished, delivered or required to be delivered by, or for, the Contractor: (1) to City under the Contract Documents or; (2) developed or prepared by or for the Contractor specifically to discharge its duties under the Contract Documents.
1.1.1.24 Design Professional -- The individuals or entities who will provide the Contractor with the required architectural, engineering, and other professional services required for the coordinated design of the Project and the administration of construction.
1.1.1.25 Design Work -- The portion of the Work on the Project consisting of the Design services and design deliverables required to be provided in connection with the Design of the Project as set forth in the Contract Documents.
1.1.1.26 Drawings -- The graphic and pictorial portions of the Contract Documents showing the design, location, and dimensions of the Work to be done on the Project, generally including plans, elevations, sections, details, schedules, and diagrams prepared as part of the Design Materials. The Drawings are listed in the List of Drawings.
1.1.1.27 Effective Date of the Contract – The date indicated in the Contract on which it becomes effective, but if no such date is indicated, it 774
A2-35
means the date on which the Contract is signed and delivered by the last of the two parties to sign and deliver.
1.1.1.28 Force Majeure Event -- An event that materially affects a party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the Site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the Work); (4) pandemics, epidemics or quarantine restrictions; (5) strikes and other organized labor action occurring at the Site and the effects thereof on the Work, only to the extent such strikes and other organized labor action are beyond the control of Contractor and its Subcontractors, of every Tier, and to the extent the effects thereof cannot be avoided by use of replacement workers; and (6) a Critical Supply Shortage. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of the City in its capacity as a municipal authority.
1.1.1.29 Governmental Approvals -- Those governmental actions required to be obtained by City and necessary for the completion of the Project.
1.1.1.30 Hazardous Materials – Any substance: the presence of which requires investigation or remediation under any federal, state or local law, statute, regulation, ordinance, order, action, policy, or common law; which is or becomes defined as a "hazardous waste," "hazardous substance," pollutant, or contaminant under any federal, state or local law, statute, regulation, rule or ordinance, or amendments thereto, including, without limitations, the Comprehensive Environmental Response, Compensation
and Liability Act, 42 U.S.C. Section 9601 et seq. ("CERCLA"), as amended, or the Resource, Conservation and Recovery Act, as amended, 42 U.S.C. Section 6901 et seq. ("RCRA"); which is petroleum, including crude oil or any fraction thereof not otherwise designated as a “hazardous substance” under
CERCLA including, without limitation, gasoline, diesel fuel, or other petroleum hydrocarbons; which is toxic, explosive, corrosive, flammable, infectious, radioactive, carcinogenic, mutagenic, or otherwise hazardous and is or becomes regulated by any regulatory City or instrumentality or the United States; the presence of which on the Site causes or threatens to cause a nuisance upon the Site or to the adjacent properties or poses or 775
A2-36
threatens to pose a hazard to the health or safety of persons on or about the Site; the presence of which on adjacent properties could constitute a trespass by the Contractor or the City; or as defined in the California Health and Safety Code. For the purposes of this Contract, “Hazardous Materials” shall also include, but are not limited to, “Underground Storage Tanks.” "Underground Storage Tank" shall have the definition assigned to that term by Section 9001 of RCRA, 42 U.S.C. Section 6991, and also shall include: any tank of one thousand one hundred (1,100) gallons or less capacity used for storing motor fuel; any tank used for storing heating oil for consumption on the premises where stored; any septic tank; and any pipes connected to the above items.
1.1.1.31 Holidays -- Holidays occur on:
New Year’s Day - January 1
Martin Luther King Jr. Day – Third Monday of January
President’s Day – Third Monday of February
Memorial Day - Last Monday in May
Independence Day - July 4
Labor Day - First Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth Thursday in November
Friday after Thanksgiving
Christmas Eve – December 24
Christmas Day – December 25
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are both Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday are both Holidays.
1.1.1.32 Liens -- Charges, security interests, or encumbrances upon Project funds, or personal property, including without limitation Stop Payment Notices.
1.1.1.33 Milestones -- A principal event specified in the Contract Documents associated with a required completion date or time prior to Completion of all the Work. Failure to achieve Milestones may result in Liquidated Damages as described in the Contract Documents.
1.1.1.34 Notice of Award -- The written notice by City to the Contractor stating that upon timely compliance by the Contractor with the conditions precedent listed therein, City will sign and deliver the Contract.
776
A2-37
1.1.1.35 Notice of Completion -- The form which may be executed by City and recorded by the county where the Project is located constituting final acceptance of the Project.
1.1.1.36 Notice to Proceed -- A written notice given by City to the Contractor fixing the date on which the Contractor may proceed with the Work and when Contract Time will commence to run.
1.1.1.37 Partial Utilization – Use by City of a substantially completed part of the Work prior to Completion of all the Work.
1.1.1.38 Performance Specifications -- That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and
procedural matters applicable thereto included within the Bridging Documents.
1.1.1.39 Project -- The total design and construction of which the Work performed under the Contract Documents may be the whole, or a part, and which may include separate design or construction work performed by City or by Separate Contractors for the Project.
1.1.1.40 Project Completion Date -- The date by which the Contractor agrees that all Work described in the Contract Documents shall be completed. The Project Completion Date is set forth in the Contract.
1.1.1.41 Project Schedule -- The graphical representation of a practical plan to complete the Work on the Project within the Project Completion Date and other Contract Times. The detailed
requirements for the Project Schedule are stated in Article 6.
1.1.1.42 Proposal -- The proposal submitted by the Contractor in response to the Request for Proposal for this Project.
1.1.1.43 Request for Proposal (“RFP”) -- The request for proposal issued by City for the Project and includes all documents, exhibits, attachments, and addenda thereto.
1.1.1.44 Samples -- Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged.
777
A2-38
1.1.1.45 Separate Contractor -- A person, or firm, under separate contract with City performing other work at the Project site which may affect the Work.
1.1.1.46 Shop Drawings -- All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.
1.1.1.47 Site -- Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor.
1.1.1.48 Stop Payment Notice -- A written notice as defined in Civil Code section 8044.
1.1.1.49 Subcontractor – An individual or entity that has a contract with the Contractor or with a Subcontractor of the Contractor to perform a portion of the Work on the Project. Unless otherwise specifically provided, the term Subcontractor includes Subcontractors of all tiers.
1.1.1.50 Submittal -- Written or graphic information and physical samples prepared and supplied by the Contractor demonstrating various portions of the Work.
1.1.1.51 Supplier -- A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment used in the performance of the Work or to be incorporated in the Work.\
1.1.1.52 Technical Specifications -- All documents developed by the Contractor and which are ready for final construction.
1.1.1.53 Tier -- The contractual level of a Subcontractor or supplier or consultant with respect to the Contractor. For example, a first tier Subcontractor is under subcontract with the Contractor, a second tier Subcontractor is under subcontract with a first tier Subcontractor, and so forth.
1.1.1.54 Underground Facilities -- Pipes, pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, and other similar underground structures or utilities, including appurtenances, 778
A2-39
used for conveying or storing water, sewer, storm drainage, gas, oil, electricity, telecommunications, or other utilities.
1.1.1.55 Warranty -- A written guarantee provided to City by the Contractor that the Work remain free of defects and suitable for its intended use for the period required by the Contract Documents or the longest period permitted by the law of this State, whichever is longer.
1.1.1.56 Work -- The entire design and construction, or the various separately identifiable parts thereof, required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such design and construction, and
furnishing, installing, and incorporating all materials and equipment into such design and construction, all as required by the Contract Documents.
1.2 Terminology.
1.2.1 The words and terms below are not defined but, when used in the Contract Documents, have the indicated meaning.
1.2.1.1 The word “furnish,” when used in connection with services, materials, or equipment, shall mean to supply and deliver said services, materials, or equipment to the Project site (or some other specified location) ready for use or installation and in usable or operable condition.
1.2.1.2 The word “install,” when used in connection with services, materials, or equipment, shall mean to put into use or place in final position said services, materials, or equipment complete and ready for intended use.
1.2.1.3 The words “perform” or “provide,” when used in connection with services, materials, or equipment, shall mean to furnish and install said services, materials, or equipment complete and ready for intended use.
1.2.1.4 Regardless of whether “furnish,” “install,” “perform,” or “provide” is used in connection with services, materials, or equipment, an obligation of Contractor is implied.
1.2.1.5 Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
779
A2-40
2. CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE
2.1 Intent.
2.1.1. The Contract Documents are complementary; what is required by one is as binding as if required by all. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be designed and constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City.
Clarifications and interpretations of the Contract Documents shall be issued by City’s Representative as provided in these General Conditions.
2.1.2. If utilities to equipment/fixtures are not shown but are necessary to operate the equipment/fixtures, the utilities service installation is considered to be part of the Work. The implied Work will conform to the appropriate sections of the Contract Documents.
2.1.3. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing Work among Subcontractors or in establishing the extent of Work to be performed by any trade.
2.1.4. Contractor and its subcontractors have all necessary licenses, permits, and registrations required by the State of California to perform the Work, including registration with the Department of Industrial Relations for public works projects.
2.2 Standards, Specifications, Codes, Laws, and Regulations.
2.2.1 Reference to federal specifications, federal standards, other standards, specifications, manuals, or codes of any technical society, organization, or association, or to Applicable Laws, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Applicable Laws in effect at the time of opening of proposals (or on the Effective Date of the Contract if there were no proposals), except as may be otherwise specifically stated in the Contract Documents.
2.2.2 No provision of any such standard, specification, manual, or code, or any instruction of a supplier, shall be effective to change the duties or responsibilities of City, Contractor, or City’s Representative, or any of their Subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City or City’s Representative, or any of their officers, directors, 780
A2-41
members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents.
2.3 Order of Precedence.
2.3.1 The intent of the Contract Documents is to include all necessary criteria to establish the scope and quality for completion of the Work on the Project by the Contractor. The Contract Documents are complementary and what is required by one shall be as binding as if required by all. Performance by the Contractor shall be required to the extent consistent with, and reasonably inferable from, the Contract Documents.
2.3.2 Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or code, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents); or the provisions of any Applicable Laws (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Applicable Law).
2.3.3 In resolving conflicts among any of the Contract Documents, the order of precedence shall be as follows:
2.3.3.1 Change Orders, most recent first;
2.3.3.2 This Design-Build Contract;
2.3.3.3 Construction Documents. To the extent applicable in the following order:
2.3.3.3.1 Local City standards and specifications;
2.3.3.3.2 Standard drawings; and
2.3.3.3.3 Reference documents.
2.3.3.4 Special Conditions;
2.3.3.5 Scope of Work;
2.3.3.6 General Conditions;
2.3.3.7 RFP, addenda, attachments and appendices; and
2.3.3.8 Contractor’s Proposal.
2.3.4 With reference to the Drawings the order of precedence shall be as follows:
2.3.4.1 Figures govern over scaled dimensions;
2.3.4.2 Detail drawings govern over general drawings;
2.3.4.3 Change Order drawings govern over Drawings; and
2.3.4.4 Drawings govern over standard drawings.
781
A2-42
2.3.5 In the event of conflicts, the interpretation requiring the higher standard and quality shall apply consistent with the Contract Documents and Applicable Law, subject to City direction.
2.4 Amending and Supplementing Contract Documents.
2.4.1 The Contract Documents may be amended by written agreement of the City and Contractor, except as otherwise permitted under the Contract Documents (unilateral change orders) to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof only by a Change Order.
2.5 Interpretation and Use of Contract Documents.
2.5.1 City and the Contractor acknowledge that the Contract Documents may differ in some respect(s) from the other documents included in the RFP upon which the Contractor based its Proposal. Prior to the commencement of construction on the Project, the parties shall confirm, in writing, the final form of the Contract Documents that are to be utilized as incorporated and prioritized under Section 2.3 (Order of Precedence). Specifically, once approved by City, the Construction Documents become a part of the Contract Documents and define the detailed scope of construction, so long as such documents incorporate all minimum requirements of the Bridging Documents and remain consistent with the Contract Documents. The Contractor shall certify that the Construction Documents are in full compliance with the Contract Documents, except as noted.
2.5.2 Organization of the Performance Specifications into various subdivisions and the arrangement of the Drawings shall not control the Contractor in dividing portions of the Work necessary for the Project among Subcontractors or in establishing the extent of Work to be performed by any trade.
2.5.3 Unless otherwise stated in the Contract Documents, technical words and abbreviations contained in the Contract Documents are used in accordance with commonly understood design professional and construction industry meanings; nontechnical words and abbreviations are used in accordance with their commonly understood meanings.
2.5.4 The Contract Documents may omit modifying words such as “all” and “any,” and articles such as “the” and “an,” but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement. The use of the word “including,” when following any general statement, shall not be construed to limit such statement to specific items or matters set forth immediately following such word or to similar items or matters, whether or not non limiting language 782
A2-43
(such as “without limitation,” “but not limited to,” or words of similar import) is used with reference thereto, but rather shall be deemed to refer to all other items or matters that could reasonably fall within the broadest possible scope of such general statement.
2.5.5 Whenever the context so requires, the use of the singular number shall be deemed to include the plural and vice versa. Each gender shall be deemed to include any other gender, and each shall include a corporation, partnership, trust, or other legal entity, whenever the context so requires.
The captions and headings of the various subdivisions of the Contract Documents are intended only for reference and convenience and in no way define, limit, or prescribe the scope or intent of the Contract Documents or any subdivision thereof.
2.5.6 Each and every provision of law required by law to be inserted in the Contract Documents shall be deemed to be inserted herein, and the Contract Documents shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon application of either party the Contract shall be amended in writing to make such insertion or correction.
2.5.7 Before commencing any Work on the Project, the Contractor shall check and review the Contract Documents, including the Construction Documents, for conformance and compliance with all laws, ordinances, codes, rules and regulations of all governmental authorities and public utilities affecting the construction and operation of the physical plant of the Project, all quasi-governmental and other regulations affecting the construction and operation of the physical plant of the Project, and other special requirements, if any, designated in the Contract. In the event the Contractor observes any violation of any law, ordinance, code, rule or regulation, or inconsistency with any such restrictions or special requirements of the Contract, the Contractor shall immediately notify City’s Representative in writing of the same and shall cause to be corrected any such violation or inconsistency in the manner provided hereunder. The Contractor shall be solely liable for any such violation, inconsistency or special requirement, if Contractor fails to conduct such review or notification to City.
2.5.8 Before commencing any Work on the Project, the Contractor shall carefully examine all Performance Specifications, the Contract, the Contract Documents and other information given to the Contractor as to Project requirements. The Contractor shall immediately notify City’s Representative of any perceived or alleged error, inconsistency, ambiguity, or lack of detail or explanation in such documents in writing. Neither the Contractor nor any Subcontractor shall take advantage of any apparent 783
A2-44
error or omission which may be found in the Performance Specifications, the Contract, the Contract Documents or other information given to Contractor. If the Contractor or its Subcontractors, material or equipment suppliers, or any of their officers, agents, and employees performs, permits, or causes the performance of any Work under the Contract, which it knows or should have known to be in error, inconsistent, or ambiguous, or not sufficiently detailed or explained, the Contractor shall bear any and all costs arising therefrom including, without limitation, the cost of correction thereof without increase or adjustment to the Contract Price or the Project Completion Date. In no case shall any Subcontractor proceed with Work if uncertain without the Contractor’s written direction and/or approval.
2.6 Reuse of Documents.
2.6.1 Contractor grants to City a nonexclusive, perpetual, royalty-free license to use the Construction Documents and all instruments of service prepared in connection with the Project for the Project and for future City projects.
Contractor shall not be responsible for any modification, reuse, or alteration of the Construction Documents by City or third parties without Contractor’s written authorization, and City shall indemnify and hold Contractor harmless from claims arising from such reuse.
2.7 Electronic Data.
2.7.1 The data furnished by City or City’s Representative to Contractor, or by Contractor to City or City’s Representative, in electronic media format is furnished for convenience. Any conclusion or information obtained or derived from such electronic files will be at the user’s sole risk. In the event of any discrepancy among versions of documents, the official version identified in the Contract Documents (including addenda, Change Orders, or City-issued final files) shall control.
2.7.2 Because data stored in electronic media format can deteriorate or be modified inadvertently or otherwise without authorization of the data’s creator, the party receiving electronic files agrees that it will perform acceptance tests or procedures within sixty (60) Days, after which the receiving party shall be deemed to have accepted the data thus transferred.
Any errors detected within the 60-Day acceptance period will be corrected by the transferring party.
2.7.3 When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application 784
A2-45
packages, operating systems, or computer hardware differing from those used by the data’s creator.
2.8 Ownership and Use of Construction Documents.
2.8.1 The Construction Documents, and all copies thereof, furnished to, or provided by, the Contractor are the property of City. City and the Contractor explicitly agree that all materials and documents developed in the performance of this Contract are the property of City pursuant to the requirements of City. City shall have unlimited rights, for the benefit of City, in all drawings, designs, technical specifications, notes and any other documentation and other Work developed in the performance of this Contract for the Project, including the right to re-use details of the Design on any other City Work at no additional cost to City. The license and reuse terms set forth in Section 2.6 shall govern City’s use and reuse of the Construction Documents and other instruments of service. Contractor shall maintain and provide access to such materials in accordance with applicable public records and records retention laws. Any use or reuse by City of the Construction Documents on any project other than this Project without employing the services of the Contractor shall be at City’s own risk with respect to third parties. City shall not remove or alter any professional seal or certification except as permitted by Applicable Law. Contractor shall not be responsible or liable for any revisions, reuse, or modifications to the Construction Documents made by any party other than Contractor (or those for whom Contractor is legally responsible), unless Contractor has provided written authorization for such revisions, reuse, or modifications..
2.9 Administration of the Contract by City’s Representative.
2.9.1 During the term of this Design-Build Contract, City’s Representative shall have the right to review the Contractor’s Work at such intervals as deemed appropriate by City’s Representative. However, no actions taken during such review or site visit by City’s Representative shall relieve the Contractor of any of its obligations of single point responsibility for the design and construction of this Project nor form the basis for a Claim or entitlement to additional compensation or time, even if such actions extend beyond the Project Completion Date.
2.9.2 City’s Representative will not have control over, will not be in charge of, and will not be responsible for design or construction means, methods, techniques, sequences, or procedures, or for safety precautions and programs in connection with the Work on the Project, since these are solely the Contractor’s responsibility.
2.9.3 Except as otherwise provided in the Contract Documents or when direct communications have been specifically authorized, City and the Contractor 785
A2-46
shall communicate through City’s Representative. Communications by the Contractor with City’s consultants and City’s Representative’s consultants shall be through City’s Representative. Communications by City and City’s Representative with Subcontractors will be through the Contractor.
Communications by the Contractor and Subcontractors with Separate Contractors shall be through City’s Representative. The Contractor shall not rely on oral or other non-written communications.
2.9.4 Based on City’s Representative’s Project site visits, review of the Work, and evaluations of the Contractor’s Applications for Payment, City’s Representative will recommend amounts, if any, due the Contractor and will issue Certificates for Payment in such amounts in a commercially reasonable manner.
2.9.5 City’s Representative will have the authority to reject Work on the Project, or any portion thereof, which does not conform to the Contract Documents.
City’s Representative will have the authority to stop Work on the Project, or any portion thereof. Whenever City’s Representative considers it necessary, or advisable, for implementation of the intent of the Contract Documents, City’s Representative will have the authority to require additional inspection or testing of the Work on the Project in accordance with the Contract Documents, whether or not such Work is fabricated, installed, or completed. However, no authority of City’s Representative conferred by the Contract Documents nor any decision made in good faith either to exercise, or to not exercise such authority, will give rise to a duty or responsibility of City or City’s Representative to the Contractor, or any person or entity claiming under, or through, the Contractor.
2.9.6 City’s Representative will have the authority to conduct inspections in connection with beneficial occupancy and to determine the dates of Completion; will receive for review and approval any records, written warranties, and related documents required by the Contract Documents and assembled by the Contractor; and will issue a final Certificate for Payment upon the Contractor’s compliance with the requirements of the Contract Documents.
2.9.7 City’s Representative will be, in the first instance, the interpreter of the requirements of the Contract Documents and the judge of performance thereunder by the Contractor. Should the Contractor discover any conflicts, omissions, or errors in the Construction Documents or the Contract Documents; have any questions about the interpretation or clarification of the Contract Documents; question whether Work is within the scope of the Contract Documents; then, before proceeding with the Work affected, the Contractor shall notify City’s Representative in writing and request interpretation, or clarification. City’s Representative’s response to questions and requests for interpretations, clarifications, instructions, or 786
A2-47
decisions will be made with reasonable promptness. Should the Contractor proceed with the Work affected before receipt of a response from City’s Representative, any portion of the Work on the Project which is not done in accordance with City’s Representative’s interpretations, clarifications, instructions, or decisions shall be removed or replaced and the Contractor shall be responsible for all resultant losses.
2.9.8 City may at any time and from time to time, without prior notice to or approval of the Contractor, replace City’s Representative with a new City Representative. Upon receipt of notice from City informing the Contractor of such replacement and identifying the new City’s Representative, the Contractor shall recognize such person or firm as City’s Representative for all purposes under the Contract Documents.
3. AVAILABILITY AND OWNERSHIP OF LANDS AND MATERIALS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS
3.1 Availability of Lands.
City shall make available a designated area at a City yard, at no charge to Contractor, for temporary staging of Project signs, materials, equipment, and tools pending installation. Contractor shall comply with the City’s access and use requirements and remain responsible for securing and insuring its property and restoring the staging area when its use ends. Contractor shall provide any other lands or access needed for temporary construction facilities or storage at no additional cost to City.
3.2 Ownership of Site Materials Found.
The title to water, soil, rock, gravel, sand, minerals, timber and any other materials developed or obtained in the excavation or other operations of Contractor or any of its Subcontractors in the performance of the Contract, and the right to use said items in carrying out the Contract, or to dispose of same, is hereby expressly reserved by City. Neither Contractor nor any of its Subcontractors nor any of their representatives or employees shall have any right, title, or interest in said materials, nor shall they assert or make any claim thereto. Contractor will, as determined by City’s Representative in its sole discretion, be permitted to use in the Work without charge, any such materials which meet the requirements of the Contract Documents, provided City shall have the right to use or consume these materials without payment to a third party.
3.3 Hazardous Material at Site.
3.3.1 The Contractor shall have no responsibility for detection, abatement, remediation, removal or disposal of any Hazardous Material, except Hazardous Materials introduced onto the Project site by the Contractor, its 787
A2-48
employees, subcontractors, agents, or other parties acting on behalf of the Contractor. In the event that the Contractor becomes aware of the presence of, or exposure of persons to, any Hazardous Material at the Project site, the Contractor shall inform City by notice immediately. Notwithstanding anything to the contrary herein, the Contractor shall not be responsible for, and the City shall bear full responsibility and remediation costs relating to any Hazardous Materials existing at the Project site prior to commencement of the Work that are uncovered, removed or disturbed by the Contractor on the Project site resulting from the Contractor’s performance of the work hereunder, except Hazardous Materials introduced onto the Project site by the Contractor, its employees, subcontractors, agents, or other parties acting on behalf of the Contractor. The City shall not be responsible for, and the Contractor shall bear full responsibility and remediation costs relating to any Hazardous Materials introduced onto the Project site by the Contractor, its employees, subcontractors, agents, or other parties acting on behalf of the Contractor.
3.3.2 The Contractor hereby specifically agrees to indemnify, defend and hold the City, its present and future directors, officers, employees, agents, representatives, successors and assigns harmless from and against any and all losses, liabilities, claims, demands, damages, causes of action, fines, penalties, costs and expenses (including, but not limited to, all reasonable consulting, engineering, attorneys’ or other professional fees), that they may incur or suffer by reason of: (a) the existence, uncovering or unveiling, or any release by the City or Contractor of, a Hazardous Material introduced onto the Project site by the Contractor, its employees, subcontractors, agents, or other parties acting on behalf of the Contractor; (b) any enforcement or compliance proceeding commenced by or in the name of any governmental authority because of the presence on the Project site of Hazardous Materials introduced onto the Project site by the Contractor, its employees, subcontractors, agents, or other parties acting on behalf of the Contractor; and (c) any action reasonably necessary to abate, remediate or prevent a violation or threatened violation of any Hazardous Material laws by the Contractor.
3.4 Protection and Restoration of Existing Improvements and Reference Points.
Contractor shall be responsible for laying out the Work, shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations without the prior written approval of City. Contractor shall report to City’s Representative whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points or property monuments by professionally qualified personnel. Contractor shall bear all costs associated with 788
A2-49
replacement or relocation of reference points or monuments damaged or disturbed by Contractor or its Subcontractors.
4. RESERVED.
5. BONDS AND INSURANCE
5.1 Insurance.
5.1.1Minimum Requirements. Without limiting Contractor’s indemnification of the City, and prior to commencement of Work, Contractor shall obtain, provide and maintain at its own expense during the term of this Contract, policies of insurance of the type and amounts described below and in a form that is satisfactory to the City.
5.1.2General Liability Insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000 per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $4,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
5.1.3Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Contract, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.
5.1.4Umbrella or Excess Liability Insurance. Contractor may opt to utilize umbrella or excess liability insurance in meeting insurance requirements. In such circumstances, Contractor may obtain and maintain an umbrella or excess liability insurance policy with limits that will provide bodily injury, personal injury, and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability, automobile liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
5.1.4.1 A drop-down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason;
5.1.4.2 Pay on behalf of wording as opposed to reimbursement; 789
A2-50
5.1.4.3 Concurrency of effective dates with primary policies;
5.1.4.4 Policies shall “follow form” to the underlying primary policies; and
5.1.4.5 Insureds under primary policies shall also be insureds under the umbrella or excess policies.
5.1.5Workers’ Compensation Insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for Contractor’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the City and their respective officers, agents, employees, volunteers, and representatives.
5.1.6 Professional Liability/Errors and Omissions Insurance. Contactor shall obtain and maintain Professional Liability Insurance (with limits of at least $2,000,000 per claim) insuring the Contractor, its officers, directors, stockholders, employees, agents, or partner, and all other persons for whose acts the Contractor may be liable, against any and all liabilities arising out of or in connection with the negligent acts, errors or omissions of any of the foregoing in connection with the carrying out of their professional responsibilities described in the Contract. Professional Liability Insurance shall remain in full force and effect, and shall be so certified to City by the insurer, for a period of five (5) years after the completion of all of Contractor’s services hereunder and City’s acceptance of the Project. All Subcontractors performing professional services shall have professional liability insurance with the same limits (additional requirements for Professional Liability/Errors and Omissions Insurance written on a “claims made” basis are set forth below).
5.1.7 Pollution Liability Insurance. [Reserved.]
5.1.8 Builder’s Risk Insurance. Upon commencement of construction and with approval of City, Contractor shall obtain and maintain builder’s risk insurance for the entire duration of the Project until only the City has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.
5.1.8.1 The named insureds shall be Contractor and the City and their respective officers, agents, employees, volunteers, and representatives. All subcontractors (excluding those solely 790
A2-51
responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear.
Contractor shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to City. The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the City of Palm Desert. The City will act as a fiduciary for all other interests in the Project.
5.1.8.2 Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to City to ensure adequacy of terms and sub-limits and shall be submitted to the City prior to commencement of construction.
5.2 Other Provisions or Requirements
5.2.1Proof of Insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this contract. City reserves the right to require complete, certified copies of all required insurance policies, at any time.
5.2.2Duration of Coverage. Contractor shall procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees, 791
A2-52
or subcontractors. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. The City and their respective officers, agents, employees, volunteers, and representatives shall continue as additional insureds under such policies.
5.2.3Primary/Non-Contributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance.
Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
5.2.4Products/Completed Operations Coverage. Products/ completed operations coverage shall extend a minimum of three (3) years after project completion.
Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City and their respective officers, agents, employees, volunteers, and representatives shall be included as additional insureds under the Products and Completed Operations coverage.
5.2.5City’s Rights of Enforcement. In the event any policy of insurance required under this Contract does not comply with these requirements, or is canceled and not replaced, City has the right, but not the duty, to obtain the insurance it deems necessary, and any premium paid by City will be promptly reimbursed by Contractor, or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Contract.
5.2.6Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager.
5.2.7Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the City and their respective officers, agents, employees, volunteers, and 792
A2-53
representatives, or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against the City and their respective officers, agents, employees, volunteers, and representatives and shall require similar written express waivers and insurance clauses from each of its subcontractors.
5.2.8Enforcement of Contract Provisions (non-estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.
5.2.9Requirements Not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
5.2.10 Notice of Cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide the City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
5.2.11 Additional Insured Status. General liability, automobile liability, and if applicable, pollution liability policies shall provide or be endorsed to provide that the City and their respective officers, agents, employees, volunteers, and representatives shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies. Coverage shall be at least as broad as coverage provided by ISO’s Owners, Lessees, or Contractors Additional Insured Endorsement for the ongoing (i.e. ISO Form CG 20 10 07 04) and completed operations (i.e. ISO Form CG 20 37 07 04) of Contractor.
5.2.12 Prohibition of Undisclosed Coverage Limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing.
5.2.13 Separation of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply 793
A2-54
separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
5.2.14 Pass Through Clause. Contractor agrees to ensure that its sub-consultants, sub-contractors, and any other party involved with the Project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor.
Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the Project will be submitted to City for review.
5.2.15 City’s Right to Revise Requirements. The City or its Risk Manager reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor’s compensation. If the City reduces the insurance requirements, the change shall go into effect immediately and require no advanced written notice.
5.2.16 Self-Insured Retentions. Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by City.
5.2.17 Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Contract, and that involve or may involve coverage under any of the required liability policies.
5.2.18 Additional Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
5.2.19 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out the Work, the Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions, where applicable, shall include, but shall not be limited to: (A) 794
A2-55
adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.
5.3 Bond Requirements.
5.3.1Payment Bond. Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in an amount equal to one hundred percent (100%) of the Contract Price, in the form attached hereto as Attachment 5 or otherwise approved by the City. No payment will be made to Contractor until the bond has been received and approved by the City.
5.3.2Performance Bond. Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price, in the form attached hereto as Attachment 4 or otherwise approved by the City. No payment will be made to Contractor until the bond has been received and approved by the City.
5.3.3Bond Provisions. Should, in the City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from the City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the City, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. If Contractor fails to furnish any required bond, the City may terminate the Contract for cause.
5.3.4Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in 795
A2-56
conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.
6. CONTRACTOR’S RESPONSIBILITIES
6.1 Contractor Responsibility; Independent Contractor.
The Contractor shall be responsible to City for acts and omissions of the Contractor’s employees, Subcontractors, material and equipment suppliers, and their agents, employees, invitees, and other persons performing portions of Work on the Project under direct or indirect contract with the Contractor or any of its Subcontractors. City retains the Contractor on an independent contractor basis.
Contractor is an independent contractor and not an employee, agent, or representative of City. Contractor shall have no authority to bind City except as expressly provided in this Contract. The Contractor is not an employee, agent or representative of City. The Contractor represents that it is fully experienced and properly qualified to perform the class of Work provided for in this Contract and that it is properly licensed, equipped, organized, and financed to perform Work on the Project. Neither City, nor any of its officials, officers, directors, employees or agents shall have control over the conduct of Contractor or any of Contractor's officers, employees, or agents, except as set forth in this Contract. The Contractor shall maintain complete control over its employees and its Subcontractors and shall pay all wages, salaries and other amounts due such personnel in connection with their performance as required by law. The Contractor shall be responsible for all reports and obligations respecting such personnel, including but not limited to, social security taxes, income tax withholdings, unemployment insurance, and workers’ compensation insurance.
6.2 Review of Contract Documents and Field Conditions by The Contractor; Single Point Responsibility of The Contractor.
6.2.1In addition to the examination and reviews performed, and obligations assumed, incident to making the representations set forth in the Contract, the Contractor shall carefully study and compare each of the Contract Documents provided by City with the others and with information furnished by City, and shall promptly report in writing to City’s Representative any errors, inconsistencies, or omissions in the Contract Documents provided by City or inconsistencies with Applicable Law observed by the Contractor. The Contractor shall be solely responsible for any errors, inconsistencies or omissions in the Contract Documents if the Contractor fails to perform such review and examination or fails to report such errors, inconsistencies or omissions to City in writing. The City likewise shall report to Contractor any errors, inconsistencies, or omissions in the Contract Documents of which the 796
A2-57
City becomes aware in the ordinary course of business, although the City shall have no such obligation to study and compare.
6.2.2The Contractor is responsible for the design and construction of the Project and shall perform the Design Work in accordance with the standard of care ordinarily exercised by design professionals practicing under similar circumstances and conditions. The Contractor shall be solely responsible for any and all design errors including, but without limitation, errors, inconsistencies or omissions in the Construction Documents. The Contractor shall take field measurements, verify field conditions, and carefully compare with the Contract Documents such field measurements, conditions, and other information known to the Contractor before commencing Work on the Project.
Errors, inconsistencies, or omissions discovered at any time shall be promptly reported in writing to City’s Representative.
6.2.3If the Contractor performs any design and/or construction activity which it knows, or should know, involves an error, inconsistency, or omission referred to in this Article, without notifying and obtaining the written consent of City’s Representative, the Contractor shall be responsible for the resultant losses, including, without limitation, the costs of correcting Defective Work.
6.2.4City does not assume any obligation to employ the Contractor’s services or pay the Contractor royalties of any type as to future programs that may result from Work performed under this Contract.
6.2.5The Contractor shall be responsible for all plotting, printing, copying and distribution costs of any and all documents required in connection with Work on the Project.
6.2.6The Contractor agrees that it has single point responsibility for the design and construction of this Project, and agrees to utilize the highest standard of excellent design, engineering and construction practices.
6.3. Design, Supervision and Construction Procedures.
6.3.1. The Contractor shall supervise, coordinate, and direct all Work on the Project using the Contractor’s best skill and attention and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. The Contractor shall be solely responsible for, and have control over, the entire design effort, construction means, methods, techniques, sequences, procedures, and the coordination of all portions of Work on the Project, including, but without limitation, landscape and site work, utilities, and building systems.
6.3.2. The Contractor shall not be relieved of its obligation to perform all Work on the Project in accordance with the Contract Documents either by acts or 797
A2-58
omissions of City or City’s Representative in the administration of the Contract, or by tests, inspections, or approvals required, or performed, by persons or firms other than the Contractor.
6.3.3. The Contractor shall be responsible for inspection of all portions of Work on the Project to determine that such portions conform to the requirements of the Contract Documents and are ready to receive subsequent Work.
6.3.4. To facilitate communications and the management of the design process, the Contractor shall maintain an office in the City’s County for the duration of the design process.
6.3.5. Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for all professional design/engineering services, services, labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work on the Project, whether temporary or permanent and whether or not incorporated or to be incorporated in Work on the Project. The Contractor shall furnish architectural and engineering services for the preparation of Construction Documents necessary to complete the Project in accordance with the requirements of the Contract Documents. From the City-approved Construction Documents, which are developed from the City-accepted Proposal, the Contractor shall furnish all labor, materials, equipment, services, and transportation necessary to complete construction of the Project, including site work, structures and utilities.
6.3.6. The Contractor is required to deliver to City, if requested, any and all Design Materials including, but not limited to, calculations, preliminary drawings, construction drawings, shop drawings, electronic media data, tenant improvement documents, sketches, illustrations, specifications, descriptions, models, mockups, and other information developed, prepared, furnished, or delivered in the prosecution of the Design Work.
6.3.7. The Contractor is responsible for preparation of the Construction Documents for the entire Project. The Contractor is responsible for construction of the entire Project as required by the Contract Documents.
6.4 Labor; Working Hours.
6.4.1 The Contractor shall provide competent, suitably qualified personnel to survey and lay out the Work and perform construction as required by the Contract Documents. The Contractor shall at all times maintain good 798
A2-59
discipline and order at the Site. The Contractor will provide all labor needed to complete the Work within the Contract Times.
6.4.2 Except as required for the safety or protection of persons, the Work, or property, and except as otherwise stated in the Contract Documents, Work at the Site shall be performed during the regular Monday through Friday working hours established in the City-approved Construction Schedule, excluding Holidays and identified Schedule Constraints. Contractor shall not perform Work outside those hours, including on Saturdays, Sundays, Holidays, or during Schedule Constraints, without the City’s prior written consent. Contractor shall promptly notify City’s Representative of any emergency Work performed outside regular working hours. Costs of inspections outside regular working hours shall be allocated in accordance with Section 6.19.1.4.
6.5 Progress Meetings.
6.5.1 The Contractor shall schedule and hold regular on-site progress meetings at least weekly and at other times as requested by the City or as required by progress of the Work. The Contractor, City’s Representative, and all Subcontractors active on the Site shall attend each meeting. The Contractor may at its discretion request attendance by representatives of its suppliers, manufacturers, and other Subcontractors. City’s Representative will preside at the progress meetings and will arrange for keeping and distributing the minutes. The purpose of the meetings is to review the progress of the Work, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems which may develop.
During each meeting, the Contractor shall present any issues which may impact its progress with a view to resolve these issues expeditiously.
6.6 Cost-Loaded CPM Progress Schedule and Recovery Schedule.
6.6.1 Contractor shall adhere to the Project Schedule, which shall be a cost-loaded CPM progress schedule established in accordance with the Contract Documents as it may be adjusted from time to time as provided below:
6.6.2 Contractor shall submit to City’s Representative for acceptance proposed adjustments in the Project Schedule that will not result in changing the Project Completion Date. Such adjustments will comply with any provisions of the General Requirements applicable thereto.
6.6.3 Proposed adjustments in the Project Schedule that will change the Project Completion Date shall be submitted in accordance with the requirements of the Contract Documents. Adjustments in the Project Completion Date may only be made by a Change Order.
799
A2-60
6.6.4 Should any of the following conditions exist, City may direct Contractor to prepare, at no extra cost to City, a plan of action and a recovery schedule for completing the Work and achieving all contractual milestones within the Project Completion Date:
6.6.4.1 The Contractor's monthly progress report indicates delays that are, in the opinion of City, of sufficient magnitude that City questions the Contractor's ability to complete the Work;
6.6.4.2 The Project Schedule shows the Contractor to be thirty (30) or more Days behind the critical path at any time during construction;
6.6.4.3 The Contractor desires to make changes in the logic or the planned duration of future activities of the Project Schedule which, in the opinion of City, are major in nature.
6.6.4.4 The recovery schedule shall include proposed revisions to the Project Schedule, demonstrating how Contractor intends to achieve all contractual milestones including contract completion within the Project Completion Date. The submittal shall include a narrative describing the actions planned by the Contractor to recover the schedule.
6.6.4.5 Contractor shall submit the recovery schedule within seven (7) Days of City’s request:
6.6.4.5.1 If Contractor asserts that City is responsible for the delay, failure to submit the recovery schedule within seven (7) Days of City’s request will be considered a concurrent
delay event attributable to Contractor, and Contractor shall only be entitled to non-compensable adjustments to the
Project Completion Date.
6.6.4.5.2 If Contractor is responsible for the delay, this provision will not limit or affect Contractor's liability and failure to submit the recovery schedule with seven (7) Days of City’s
request may result in City withholding progress payments or other amounts due under the Contract Documents.
6.6.4.5.3 Contractor is responsible for all costs associated with the preparation and execution of the recovery schedule,
including any necessary recovery actions, which may
include, but are not limited to, assignment of additional labor, and/or equipment, shift or overtime work, expediting 800
A2-61
of submittals or deliveries, overlapping of activities or sequencing changes to increase activity concurrence.
6.6.4.5.4 Regardless of whether City directs Contractor to prepare a recovery schedule pursuant to this Article, Contractor shall promptly undertake appropriate action at no
additional cost to City to recover the schedule whenever the current Project Schedule shows that the Contractor will not achieve a milestone and/or complete the Work within the Project Completion Date.
6.6.4.6 Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, testing, start up, and completion of the Work within the Project Completion Date.
6.6.4.7 Failure of City’s Representative to discover errors or omissions in schedules that it has reviewed, or to inform the Contractor that the Contractor, Subcontractors, or others are behind schedule, or to direct or enforce procedures for complying with the Project Schedule shall not relieve the Contractor from its sole responsibility to perform and complete all Work on the Project within the Project Completion Date and shall not be a cause for an adjustment of the Project Completion Date or the Contract Price.
6.6.5 The Contractor shall perform all Work on the Project in accordance with the current accepted Project Schedule.
6.7 Materials.
6.7.1 All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All materials furnished by the Contractor shall be of the most suitable grade for the purpose intended considering strength, ductility, durability, and best industry practice.
6.7.2 All special warranties and guarantees required by the Contract Documents shall expressly run to the benefit of City. If required by City’s Representative, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment.
6.7.3 All materials and equipment shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with 801
A2-62
instructions of the applicable supplier, except as otherwise may be provided in the Contract Documents.
6.7.4 Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of the Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work until City has accepted the Work. Materials shall be stored on the Project site in such manner so as not to interfere with any operations of City or any independent contractor.
6.7.5 No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the work and agrees upon completion to deliver the Work to City free from any claims, liens, or encumbrances.
6.8 Inspection of Materials.
6.8.1 Materials furnished by the Contractor which will become a part of the Project shall be subject to inspection at any one or more of the following locations, as determined by City’s Representative: at the place of production or manufacture, at the shipping point, or at the site of the Work. To allow sufficient time to provide for inspection, the Contractor shall submit to City’s Representative, at the time of issuance, copies of purchase orders or other written instrument confirming procurement of the materials, including drawings and other pertinent information, covering materials on which inspection will be made.
6.8.2 The inspection of materials at any of the locations specified above or the waiving of the inspection thereof shall not impact whether the materials and equipment conform to the Contract Documents. Contractor will not be relieved from furnishing materials meeting the requirements of the Contract Documents due to City’s inspection or lack of inspection of the equipment or materials. Acceptance of any materials will be made only after materials are installed in the Project.
6.9 Submittals; Shop Drawings; Samples.
6.9.1 Submittals Generally.
6.9.1.1 Contractor shall prepare, review, and submit to City’s Representative all submittals required by the Contract
802
A2-63
Documents, including shop drawings, product data, samples, calculations, and test reports (“Submittals”).
6.9.1.2 Contractor shall be solely responsible for the completeness, accuracy, coordination, and compliance of all Submittals with the Contract Documents.
6.9.2 Contractor Responsibility and Certification.
6.9.2.1 Contractor is solely responsible for the completeness, accuracy, coordination, and compliance of Submittals with the Contract Documents and field conditions.
6.9.2.2 Before submitting any Submittal, Contractor shall review and approve it; verify field measurements, quantities, and conditions; and confirm coordination with related Work.
6.9.2.3 Each Submittal shall bear Contractor’s approval stamp or written certification. Submittals without Contractor’s approval will be returned without review.
6.9.3 Submittal Schedule.
6.9.3.1 Contractor shall prepare and maintain a Submittal Schedule integrated with the accepted Project Schedule and submit Submittals sufficiently in advance to avoid delay. Contractor is responsible for all impacts arising from untimely, incomplete, or noncompliant Submittals.
6.9.4 No Work Prior to Required Review/Approval.
6.9.4.1 Where the Contract Documents require Submittals to be reviewed or approved, Contractor shall not fabricate, procure, or install the related Work until the required review/approval is 803
A2-64
obtained. Any such Work performed early is at Contractor’s sole risk and expense.
6.9.5 City’s Review is Limited.
6.9.5.1 City’s review is for general conformance with the design intent and Contract Documents. City’s review (or lack of comment) does not:
6.9.5.1.1 Relieve Contractor of responsibility for Contractor’s errors, omissions, or deviations;
6.9.5.1.2 Relieve Contractor of responsibility for coordination; or
6.9.5.1.3 Approve means/methods, sequences, procedures, or safety programs.
6.9.5.2 Contractor shall not be responsible for an error in sign content furnished by City that Contractor accurately reproduces in a proof approved by City. Contractor remains responsible for errors it introduces in its proofs or during fabrication and installation.
6.9.6 Deviations.
6.9.6.1 Contractor shall clearly identify in writing any requested deviation from the Contract Documents at the time of
submission. City review does not approve any deviation unless City expressly approves it in writing.
6.10 Construction Documents.
6.10.1 Contractor shall cause its Design Professional to design Project and prepare the Construction Documents. The Construction Documents shall provide information customarily necessary in documents for projects of similar size, complexity, and quality. The Construction Documents shall include all information required by the building trades to complete the construction of the Project, other than such details customarily developed by others during construction. City’s review of the Construction Documents shall be conducted in accordance with the approved Project Schedule with procedures set forth in this Article. Such review shall not relieve the Contractor from its responsibilities under the Contract. Such review shall not be deemed an approval or waiver by City of any deviation from, or of the Contractor’s failure to comply with, any provision or requirement of the Contract Documents, unless such deviation or failure has been identified as 804
A2-65
such in writing in the Document submitted by the Contractor and approved by City.
6.10.2 However, it is acknowledged by the parties hereto that inherent in a design-build concept, bridging or otherwise, the production and review of Construction Documents may be a continuing process with portions thereof completed at different times. The Contractor will submit the Construction Document packages to City for review and approval in accordance with the agreed upon schedule, unless otherwise approved in writing by City. The Project Schedule shall indicate the times for City to review the completion of each such portion of the Construction Documents and a reasonable time for review of same.
6.10.3 The Contractor shall submit completed packages of the Construction Documents for review by City at the times indicated on the Project Schedule and as defined in the Scheduling Specification. Meetings between the Contractor and City to review the Construction Document packages, shall be scheduled at least every two weeks, or as otherwise agreed to by the parties, and held so as not to delay Work on the Project. The Contractor will conduct these design meetings with City in accordance with the schedule approved by City. The Contractor will be responsible for preparing and circulating for the parties review, design meeting minutes from all such meetings.
6.11 Field Engineering.
6.11.1 The Contractor shall retain and pay expenses of a civil engineer or land surveyor to establish on the Project site the required reference points and benchmarks, establish building lines and elevations, check for building framing, plumbness, and establish on building frame the required basic grid lines. The engineer or land surveyor shall be properly licensed in the State of California.
6.11.2 The Contractor shall locate and protect control points prior to starting Work on the Project site and preserve permanent reference points during construction, and shall require the engineer or surveyor to replace control points which become lost or destroyed.
6.12 Geotechnical and Survey.
6.12.1 The City shall arrange for the geotechnical and soils investigations, including any additional tests or borings, necessary to support the Project’s design and construction. Costs incurred by the City for these services shall be charged against the Contractor’s budget included within the Contract Price and shall not increase the Contract Price. The Contractor shall identify and coordinate the testing requirements with the City and remain 805
A2-66
responsible for incorporating the findings and recommendations into the design.
6.12.2 The Contractor shall verify the location and depth (elevation) of all existing utilities and services before performing any excavation work in accordance with Government Code section 4216 et seq.
6.13 Utility Location.
6.13.1 Location. It shall be Contractor’s responsibility to determine the exact location and depth of all utilities, including service connections, which Contractor believes may affect or be affected by Contractor’s operations, by calling Underground Service Alert to locate utilities in accordance with the procedures described in Government Code 4216 et seq. Contractor shall not be entitled to additional compensation nor time extensions for work necessary to avoid interferences nor for repair to damaged utilities if Contractor does not expose all such existing utilities as required by this Article. The locating of utilities shall be in conformance with Government Code section 4216 et seq. except for City’s utilities located on City’s property and not on public right-of-way.
6.13.2 Notification. Pursuant to Government Code section 4216.2, Contractor shall contact the appropriate regional notification center at least two (2) working days but not more than 14 Days before performing any excavation. The date of the notification shall not count as part of the two-working-day notice.
Before notifying the appropriate regional notification center, Contractor shall delineate the area to be excavated. Contractor shall request that the utility owners conduct a utility survey and mark or otherwise indicate the location of their service. Contractor shall furnish to the City’s Representative written documentation of its contact(s) with the regional notification center prior to commencing excavation at such locations.
6.13.3 Potholing. Where an existing utility may conflict with a proposed excavation, Contractor shall determine its actual location and depth by hand excavation or another method permitted by applicable law before using powered excavation equipment within the utility’s tolerance zone. Contractor shall notify City’s Representative before performing this investigation and promptly report any conflict that may require a change to the design or location of the Work. Contractor shall comply with Government Code section 4216.4
6.13.4 High Priority Subsurface Installation. If excavation is proposed within ten (10) feet of a high priority subsurface installation, Contractor shall comply with Government Code section 4216.2(c), including participating in any required onsite meeting with the operator before excavation. Contractor shall notify City’s Representative before the meeting and promptly report any conflict that may require a change to the design or location of the Work. 806
A2-67
6.14 Dust Control.
Contractor, at its expense, shall maintain all excavations, embankments, haul roads, permanent access rods, plant sites, waste disposal areas, borrow areas, and all other work areas free from dust. Industry accepted methods of dust control suitable for the area involved, such as sprinkling, chemical treatment, light bituminous treatment or similar methods, will be permitted.
6.15 Air Pollution.
6.15.1 To the extent applicable, Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine.
Contractor shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory District for violations of applicable laws, rules and/or regulations by Contractor, its sub-consultants, or others for whom Contractor is responsible under its indemnity obligations provided for in this Agreement.
6.15.2 The Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes. All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements.
Contractor shall not discharge into the atmosphere from any source whatever smoke, dust, or other air contaminants in violation of the laws, rules, and regulations of the governmental entities having jurisdiction.
6.15.3 To the extent applicable, Contractor shall comply, and shall ensure all Subcontractors comply, with all requirements of CARB including, without limitation, all applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all pending amendments (“CARB Regulation”). Throughout Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and Subcontractors’ fleet including, without limitation, the certificate of reported compliance, fuel/refueling records, maintenance records, emissions records, and any other information Contractor is required to produce, keep or maintain pursuant to the CARB Regulation upon two (2) calendar days’ notice from City. Contractor shall be solely liable for any and all costs associated with complying with the CARB Regulation 807
A2-68
as well as for any and all penalties, fines, damages, or costs associated with any and all violations, or failures to comply with the CARB Regulation. Contractor shall defend, indemnify and hold harmless City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the CARB Regulation.
6.16 Patent Fees and Royalties.
6.16.1 Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City or City’s Representative, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents.
6.16.2 To the fullest extent permitted by Applicable Laws, Contractor shall indemnify, defend, and hold harmless City and City’s Representative, and the officers, directors, members, partners, employees, agents, consultants and subcontractors of each and any of them, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents or specified in the Contract Documents and identified as being subject to payment of any license fee or royalty to others required by patent rights or copyrights.
6.17 Permits and Licenses.
6.17.1 Contractor shall obtain and pay for all other permits and licenses required for the Work, including excavation permit and permits for plumbing, mechanical and electrical work and for operations in or over public streets or right of way under jurisdiction of public agencies other than City.
6.17.2 The Contractor shall arrange and pay for all off-site inspection of the Work related to permits and licenses, including certification, required by the Performance Specifications, drawings, or by governing authorities, 808
A2-69
except for such off-site inspections identified as City's responsibility in the Contract Documents.
6.17.3 Before acceptance of the Work, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to City.
6.18 Applicable Laws.
Contractor shall give all notices required by and shall comply with all Applicable Laws applicable to the performance of the Work. Except where otherwise expressly required by Applicable Laws, neither City nor City’s Representative shall be responsible for monitoring Contractor’s compliance with any Applicable Laws.
If Contractor performs any Work knowing or having reason to know that it is contrary to Applicable Laws, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
6.19 Labor Laws and Contractor’s Obligations.
6.19.1 Hours of Work.
6.19.1.1 The Contractor and Subcontractors shall furnish sufficient forces to ensure the prosecution of the Work on the Project in accordance with the Construction Schedule and in such a manner to allow for the full and adequate completion of the Project within the Project Completion Date.
6.19.1.2 Work on the Project shall be performed during the regular working hours established in the City-approved Construction Schedule. Work outside those hours requires the City’s prior written consent, except in an emergency. Contractor shall promptly notify City of any emergency work performed outside regular working hours.
6.19.1.3 Eight (8) hours of work shall constitute a legal day’s work. The Contractor and each Subcontractor shall forfeit, as penalty to City, twenty-five dollars ($25) for each worker employed in the execution of Work on the Project by the Contractor or any Subcontractor for each day during which such worker is required or permitted to work more than eight (8) hours in any one day and forty (40) hours in any week in violation of the provisions of the Labor Code, and in particular, Section 1810 to Section 1815, except as provided in Labor Code Section 1815 which provides that work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon public work upon compensation for all hours 809
A2-70
worked in excess of 8 hours per day at not less than 11/2 times the basic rate of pay.
6.19.1.4 If the work done after hours is required by the Contract to be done outside the Contractor’s regular working hours, the costs of any inspections, if required to be done outside normal working hours, shall be borne by City. If City allows the Contractor to do Work outside regular working hours for the Contractor’s own convenience, the costs of any inspections required outside regular working hours shall be invoiced to the Contractor by City and deducted from the next progress payment. If the Contractor elects to perform Work outside the Inspector’s regular working hours, costs of any inspections required outside regular working hours shall be invoiced to the Contractor by City and deducted from the next progress payment.
6.19.1.5 No Work on the Project or other activities by or on behalf of the Contractor which presents a hazard or unreasonable disruption to City staff shall be allowed during normal working hours. The determination as to whether Work on the Project or some other activity presents a hazard or constitutes an unreasonable disruption to City staff shall be made by and pursuant to the sole discretion of a representative of City. All Work on the Project or other activities which could present a hazard or unreasonable disruption to City staff shall be performed before or after normal working hours, on weekends, or on an City recognized holiday.
Neither the Contractor nor its Subcontractors or anyone working on behalf of the Contractor or Subcontractors shall be entitled to additional compensation or an extension of the Project
Completion Date for having to arrange their Work schedule so as not to violate the provisions of this Article. The Contractor, Subcontractors and persons working on behalf of the Contractor shall be expected to arrange such Work and other activities in advance so as to avoid creating monetary or time impacts.
6.19.2 Wage Rates, Travel, and Subsistence.
6.19.2.1 The Contractor is aware of the requirements of Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since the Work on the Project involves an applicable “public works” or
“maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, the 810
A2-71
Contractor agrees to fully comply with such Prevailing Wage Laws. City has obtained the prevailing wage rates from the Director of the Department of Industrial Relations, State of California. Copies of the prevailing wage rates are on file at City’s office and shall be made available to any interested party on request. the Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to perform the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. The Contractor shall defend, indemnify and hold City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.
6.19.2.2 Pursuant to Labor Code Section 1775, the Contractor is hereby advised that in the event that the Contractor fails to pay prevailing wages, the Contractor will be held liable for penalties and for shortfalls in wages and such amounts may be withheld from progress payments. The Contractor and each
Subcontractor shall forfeit as a penalty to City not more than two hundred dollars ($200) for each Day, or portion thereof, for each worker paid less than the stipulated prevailing wage rate for any work done by him, or by any subcontract under him, in violation of the provisions of the Labor Code. The difference between such stipulated prevailing wage rate and the amount paid to each worker for each Day or portion thereof for which each worker was paid less than the stipulated prevailing wage rate shall be paid to each worker by the Contractor.
6.19.2.3 The Contractor shall post, at appropriate conspicuous points on the Project site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.
6.19.3 Labor Compliance/Payroll Records.
6.19.3.1 Pursuant to Labor Code Section 1776, the Contractor and each Subcontractor shall maintain weekly certified payroll records showing the name, address, social security number, work classification, straight time and overtime hours paid each day and week, and the actual per diem wages paid to each
journeyman, apprentice, worker or other employee employed in connection with the Project. The Contractor shall certify under penalty of perjury that records maintained and submitted by the 811
A2-72
Contractor are true and accurate. The Contractor shall also require Subcontractor(s) to certify weekly payroll records under penalty of perjury.
6.19.3.2 In accordance with Labor Code section 1771.4, the Contractor and each Subcontractor shall furnish the certified payroll records directly to the Department of Industrial Relations (“DIR”) on a weekly basis and in the format prescribed by the DIR. This may include electronic submission. Contractor shall ensure full compliance with all requirements and regulations from the DIR relating to labor compliance monitoring and enforcement and all other applicable labor law.
6.19.3.3 Any stop orders issued by the DIR against Contractor or any Subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility.
Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City.
Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against Contractor or any Subcontractor.
6.19.3.4 The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City.
The Contractor shall also provide the following:
6.19.3.5 A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.
6.19.3.6 A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the DIR.
6.19.3.7 Unless submitted electronically, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.
6.19.3.8 Any copy of records made available for inspection as copies and furnished upon request to the public or any public City, the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's name, 812
A2-73
address and social security number. The name and address of the Contractor awarded the Contract or performing the contract shall not be marked or obliterated.
6.19.3.9 In the event of noncompliance with the requirements of this Article, the Contractor shall have ten (10) Days in which to comply subsequent to receipt of written notice specifying any item or actions necessary to ensure compliance with this Article.
Should noncompliance still be evident after such ten (10) day period, the Contractor shall, as a penalty to the City, forfeit One Hundred Dollars ($100.00) for each day, or portion thereof, for each worker until strict compliance is effectuated. Upon the request of DIR, such penalties shall be withheld from contract payments.
6.19.3.10 In submitting the Proposal on this Project, it shall be the Contractor’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this Contract and Applicable Law in its Proposal.
6.19.3.11 The Contractor shall include provisions of this Article in all Subcontracts and require Subcontractors to comply with these provisions at no additional cost to City.
6.19.4 Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.
6.19.5 Nondiscrimination. Pursuant to Labor Code section 1735 and other applicable provisions of law, the Contractor and its Subcontractors shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap on this Work. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap.
6.19.6 Workers’ Compensation. Pursuant to Labor Code section 1860, Contractor shall secure the payment of workers’ compensation to its 813
A2-74
employees in accordance with the provisions of Labor Code section 3700. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work.
6.19.7 Public Works Registration. Pursuant to Labor Code sections 1725.5 and 1771.1, the Contractor and its Subcontractors must be registered with the Department of Industrial Relations prior to the execution of a contract to perform public works. By entering into this Contract, Contractor represents that it is aware of the registration requirement and is currently registered with the DIR. Contractor shall maintain a current registration for the duration of the Project. Contractor shall further include the requirements of Labor Code sections 1725.5 and 1771.1 in any Subcontract and ensure that all Subcontractors are registered at the time this Contract is entered into and maintain registration for the duration of the Project.
6.19.8 Debarment. Contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a contractor on the project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.
7. GENERAL CONSTRUCTION PROVISIONS
7.1 Taxes. The Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid in accordance with the Applicable Law of the place of the Project which are applicable during the performance of the Project. In accordance with Revenue and Taxation Code Section 107.6, the Contract Documents may create a possessory interest subject to personal property taxation for which the Contractor will be responsible.
7.2 Use of Site and Other Areas.
7.2.1 Limitation on Use of Site and Other Areas. The Contractor shall confine construction equipment, the storage of materials and equipment, and the 814
A2-75
operations of workers to the Site and other areas permitted by Applicable Laws, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the City or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. Should any claim be made by any such City or occupant because of the performance of the Work, Contractor shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law.
7.2.2 Removal of Debris. During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to Applicable Laws.
7.2.3 Cleaning. Prior to Completion of the Work, Contractor shall clean the Site and the Work and make it ready for utilization by City. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents.
7.2.4 Loading Structures. Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it.
7.3 Utility Usage. All temporary utilities, including but not limited to electricity, water, gas, and telephone, used on the Work shall be furnished and paid for by Contractor. Contractor shall provide necessary temporary distribution systems, including meters, if necessary, from distribution points to points on the Work where the utility is needed. Upon completion of the Work, Contractor shall remove all temporary distribution systems. All permanent meters installed shall be listed in the Contractor’s name until the Work is accepted. If Work is to be performed in existing City’s facilities, Contractor may, to the extent authorized by City in writing, use City’s existing utilities. If Contractor uses City utilities, it shall compensate City for utilities used.
7.4 Record Drawings.
7.4.1 Contractor shall maintain in a safe place at the Site one record copy of the Contract Documents and written interpretations and clarifications in good order and annotated to show changes made during construction. On these, it shall mark all Project conditions, locations, configurations, and any other changes or deviations which may vary from the information represented in the original Contract Documents, including buried or concealed construction 815
A2-76
and utility features which are revealed during the course of construction.
Said record drawings shall be supplemented by any detailed sketches as necessary or directed to fully indicate the Work as actually constructed.
These master record drawings of the as-built conditions, including all revisions made necessary by Addenda and Change Orders shall be maintained up-to-date during the progress of the Project. Red ink shall be used for alterations and notes. Notes shall identify relevant Change Orders by number and date.
7.4.2 Record drawings shall be accessible to City’s Representative at all times during the construction period. Upon Completion of the Project and as a condition of final acceptance, the Contractor shall finalize and deliver a complete set of record drawings to City’s Representative. The information submitted by the Contractor will be assumed to be correct, and the Contractor shall be responsible for, and liable to City, for the accuracy of such information, and for any errors or omissions which may or may not appear on the record drawings.
7.5 Excusable Delays.
7.5.1 Contract Time may be adjusted, subject to approval by the City which shall not be unreasonably withheld or conditioned, for delays beyond the reasonable control of the Contractor, including but not limited to utility coordination, third-party permitting, or material procurement delays not reasonably foreseeable at the time of proposal, provided the Contractor demonstrates that such delays could not have been avoided through reasonable planning and diligence.
7.6 Safety and Protection.
7.6.1 Contractor shall be solely responsible for all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety laws. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to:
7.6.1.1 All persons on the Site or who may be affected by the Work;
7.6.1.2 All the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and
7.6.1.3 Other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, 816
A2-77
and Underground Facilities not designated for removal,
relocation, or replacement in the course of construction.
7.6.2 Contractor shall comply with all Applicable Laws relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. Contractor shall comply with the applicable requirements of City’s safety programs, if any. Contractor shall inform City and City’s Representative of the specific requirements of Contractor’s safety program with which City’s and City’s Representative’s employees and representatives must comply while at the Site.
7.6.3 All damage, injury, or loss to any property caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
7.7 Safety Representative.
7.7.1 Contractor shall designate an OSHA-certified and experienced safety representative at the Project site whose duties and responsibilities shall include the prevention of accidents and the implementation, maintenance, and supervision of all safety precautions and programs in connection with the Work.
7.7.2 The safety representative shall be authorized to act on behalf of Contractor in all matters relating to safety. Contractor shall provide City’s Representative with the name and contact information of the designated safety representative in writing prior to commencement of the Work and shall promptly notify City of any change in such designation.
7.7.3 Hazard Communication Programs. Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the Project site in accordance with Applicable Laws.
7.7.4 Emergencies. In an emergency affecting safety of life or of Work or of adjoining property, Contractor, without special instruction or authorization from City, shall act to prevent such threatened loss or injury; and Contractor shall so act, without appeal, if directed or instructed by City. Any 817
A2-78
compensation claimed by Contractor on account of emergency work shall be determined in accordance with the Contract Documents.
7.8 Guarantee.
7.8.1 The Contractor unconditionally guarantees all Work on the Project will be completed in accordance with the requirements of the Contract Documents, and will remain free of defects in workmanship and materials for a period of one (1) year from the date of Project Completion, unless a longer guarantee period is specifically called for in the Contract Documents. However, a shorter guarantee period shall apply to landscape plants, trees, turf, etc.
Trees or shrubs greater than one gallon in size at the time of planting shall be guaranteed for one (1) year, and all other plant material shall be guaranteed for six (6) months. The Contractor shall repair or replace any and all Work, together with any adjacent work that may have been damaged or displaced, which was not in accordance with the requirements of the Contract Documents, or that may be defective in its workmanship or material within the guarantee period specified in the Contract Documents, without any expense whatsoever to City; ordinary wear and tear and abuse excepted.
7.8.2 The Contractor further agrees, within fourteen (14) Days, or as such shorter period as may be designated for emergency repairs, after being notified in writing by City, of any Work not in accordance with the requirements of the Contract Documents or any defects in the Work on the Project, that the Contractor shall commence and execute, with due diligence, all Work necessary to fulfill the terms of the guarantee. If City finds that the Contractor fails to perform any of the Work under the guarantee, City may elect to have the Work completed at the Contractor’s expense and the Contractor will pay costs of the Work upon demand. City will be entitled to all costs, including reasonable attorneys’ fees and consultants’ expenses necessarily incurred upon the Contractor’s refusal to pay the above costs.
7.8.3 Where Defective Work (or damage to other Work resulting therefrom) has been corrected or removed and replaced, the Warranty period hereunder with respect to such Work shall be extended for an additional period of one (1) year after such correction or removal and replacement has been satisfactorily completed.
7.8.4 Contractor’s obligations under this Article are in addition to any other obligation or warranty and do not limit City’s rights and remedies pursuant to California Code of Civil Procedure sections 337.10 and 337.15. or any other Applicable Law.
7.8.5 Notwithstanding the foregoing provisions, in the event of an emergency constituting an immediate hazard to health or safety of City employees, 818
A2-79
property, or licensees, City may undertake, at the Contractor’s expense and without prior notice, all Work necessary to correct such condition(s) when it is caused by Work of the Contractor not being in accordance with the requirements of the Contract Documents.
7.8.6 Warranty. The Contractor warrants to City that any and all materials, equipment and furnishings incorporated in the Project will be of good quality and new unless otherwise required or permitted by the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. The foregoing warranty excludes improper operation, or normal wear and tear under normal usage under the control of City. Such warranty shall exclude warranties relating to design, warranty of fitness, and any other express or implied warranties other than as set forth herein or in the Contract Documents; provided, however, that the foregoing shall not impair the rights of City to maintain an action for breach of contract against the Contractor. Nothing contained in these Contract Documents pertaining to warranty or guarantee shall be construed as limiting any other rights City may have at law, including rights for latent defects under Code of Civil Procedure Section 337.15.
7.9 Indemnification.
7.9.1 To the fullest extent allowed by law (including without limitation Civil Code Sections 2782 and 2782.8), the Contractor shall defend (with counsel of City’s choosing), indemnify and hold City, its officials, officers, agents, employees, and representatives free and harmless from and against any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages or injuries, in law or in equity, to property or persons, including wrongful death, regardless of whether the allegations are false, fraudulent, or groundless, arising out of, related to, or in connection with any acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants, contractors, and Subcontractors arising out of or in connection with the performance of the Work or this Contract, including claims made by Subcontractors for nonpayment, and including without limitation the payment of all attorney’s fees and other related costs and expenses except to the extent caused by the sole or active negligence or willful misconduct of the City. The Contractor shall defend, at the Contractor’s own cost, expense and risk, with counsel of City’s choosing, any and all such suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its officials, officers, agents, employees and representatives. The Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City, its officials, officers, agents, employees and representatives, in any such suit, action or other legal proceeding. The Contractor shall reimburse City, its officials, officers, agents, employees and representatives for any and all legal 819
A2-80
expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The Contractor agrees to pay, or reimburse City and City’s Representative, for regulatory City or court imposed fees, fines, or penalties imposed on City and City’s Representative arising from the Contractor’s failure to complete the Project in a timely manner and/or in accordance with the Contract Documents and any applicable permits or Applicable Laws. The Contractor’s responsibility and obligation to pay, or reimburse City and City’s Representative, for these fees, fines, or penalties shall be in addition to the assessment of liquidated damages for late completion of the Project. This indemnity provision shall apply to all liability, as provided for above, regardless of whether any insurance policies are applicable. Insurance policy limits do not act as a limitation upon the amount of the indemnification to be provided by the Contractor.
7.9.2 If the Contractor’s obligation to defend, indemnify, and/or hold harmless arises out of the Contractor’s performance as a “design professional” (as that term is defined under Civil Code Section 2782.8), then, and only to the extent required under Civil Code Section 2782.8, which is fully incorporated herein, the Contractor’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor, and, upon Contractor obtaining a final adjudication by a court of competent jurisdiction, Contractor’s liability for such claim, including the cost to defend, shall not exceed the Contractor’s proportionate percentage of fault.
7.9.3 In claims against any person or entity indemnified under this Article that are made by an employee of the Contractor or any Subcontractor, a person indirectly employed by the Contractor or any Subcontractor, or anyone for whose acts the Contractor or any Subcontractor may be liable, the indemnification obligation under this Article shall not be limited by any limitation on amount or type of damages, compensation, or benefits payable by or for Contractor or any Subcontractor under workers’ compensation acts, disability benefit acts, or other employee benefit acts or any other insurance limitations.
7.9.4 In the event the Contractor and one or more than one other party is connected with an accident or occurrence covered by this indemnification, then all such parties shall be jointly and severally responsible to each of the Indemnitees for indemnification, and the ultimate responsibility among such indemnifying parties for the loss and expense of any such indemnification shall be resolved without jeopardy to any indemnitee listed in this Article.
7.9.5 The provisions of this Article shall survive the termination of this Contract howsoever caused, and no payment, partial payment, or acceptance of 820
A2-81
occupancy in whole or part of the Work shall waive or release any of the provisions of this Article.
7.10 Superintendent.
7.10.1 The Contractor shall employ a competent Superintendent satisfactory to City who shall have overall responsibility for the Construction Work across all Project sites. The Superintendent or a qualified supervisor designated by the Superintendent shall be present at each active Project site while Construction Work is performed there. The Superintendent shall remain readily available during all Construction Work. Superintendent shall represent the Contractor and communications given to, and received from, Superintendent shall be binding on the Contractor provided that such communications are consistent with the terms of this Contract.
Superintendent must be able to proficiently speak, read and write in English.
Failure to maintain the supervision required by this Section while Construction Work is in progress shall be considered a material breach of this Contract, entitling City to terminate the Contract or, alternatively, issue a Suspension Order until the Superintendent is on the Project site. If, by virtue of issuance of said Suspension Order, the Contractor fails to complete the Contract by the Project Completion Date, the Contractor will be assessed Liquidated Damages in accordance with the Contract.
7.10.2 Any changes to the assignment of the Superintendent shall receive prior written approval from City. The Superintendent may not perform the work of any trade, pick up materials, or perform any work not directly related to the supervision and coordination of the Construction Work at the Project site when work is in progress. In addition, the Contractor will provide all key personnel identified in the Contract for the time periods stipulated.
7.11 Project Staffing.
7.11.1 The Contractor and each Subcontractor shall: furnish a competent and adequate staff as necessary for the proper administration, coordination, supervision, and superintendence of its portion of the Work on the Project; organize the procurement of all materials and equipment so that the materials and equipment will be available at the time they are needed for the Work; and keep an adequate force of skilled and fit workers on the job to complete all Work on the Project in accordance with all requirements of the Contract.
7.11.2 City shall have the right, but not the obligation, to require the removal from the Project of the Contractor’s Representative, or any other superintendent, staff member, agent, or employee of any contractor, Subcontractor, material or equipment supplier, or any other entity working on the Project. Removal may be required for any reason designated by City, including but not limited 821
A2-82
to, failure or refusal to perform Work on the Project in a manner acceptable to City, uncooperative or incompetent performance on the Project, threatening the adequate or timely completion of the Project, or threatening the safety of persons or property.
7.12 Compliance With State Storm Water Permit for Construction.
7.12.1 Storm, surface, ground, nuisance, or other waters may be encountered at various times during the Work. Contractor hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Proposal accordingly, and assumes any and all risks and liabilities arising therefrom.
7.12.2 Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the City’s ordinances regulating discharges of storm water; the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.); the California Porter-Cologne Water Quality Control Act (Water Code § 13000 et seq.); and any and all regulations, policies, or permits issued pursuant to any such authority. These include, as applicable, requirements of the California Regional Water Quality Control Board for the Colorado River Basin Region and the State Water Resources Control Board’s Construction General Permit, Order WQ 2022-0057-DWQ, as amended or superseded.
7.12.3 The Contractor shall be required to comply with all conditions of the State Water Resources Control Board National Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of Stormwater Runoff Associated with Construction Activity ("Permit") for all construction activity which results in the disturbance of in excess of one acre of total land area or which is part of a larger common plan of development or sale for which coverage is required. Contractor shall determine, in coordination with City, whether Permit coverage is required; prepare the required filing documents; coordinate with City regarding any required City signature or certification; and obtain required coverage before the regulated disturbance begins. If applicable, the Contractor shall be solely responsible for preparing and implementing a Stormwater Pollution Prevention Plan (“SWPPP”) prior to initiating work on the Project. It shall be the Contractor's responsibility to evaluate the cost of procuring the Permit and preparing the SWPPP as well as complying with the SWPPP and any necessary revision to the SWPPP to address storm water impacts.
The Contractor shall comply with all requirements of the State Water Resources Control Board. The Contractor shall include all costs of compliance with specified requirements in the Price. For Sites that do not require coverage under the Permit,, the Contractor shall be responsible for 822
A2-83
preparing and implementing an Erosion and Sediment Control Plan in accordance with applicable City and regional water quality requirements..
7.12.4 The Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, monitoring and reporting requirements as required by the Permit. The Contractor shall provide copies of all reports and monitoring information to the City’s Representative. The Contractor shall comply with the lawful requirements of any applicable municipality, the County, drainage authority, and other local agencies regarding discharges of storm water to separate storm drain system or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.
7.12.5 Failure to comply with laws, regulations, and ordinances listed in this Article is a violation of federal and state law. Notwithstanding any other indemnity contained in this Contract, Contractor agrees to indemnify and hold harmless the City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, losses or liabilities of any kind or nature which the City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the laws, regulations, and ordinances listed above, arising out of or in connection with the Project, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers. City reserves the right to defend any enforcement action or civil action brought against the City for Contractor’s failure to comply with any applicable water quality law, regulation, or policy. Contractor hereby agrees to be bound by, and to reimburse the City for the costs associated with, any enforcement action and/or settlement reached between the City and any relevant enforcement entity.
7.13 Monthly Report. The Contractor shall prepare and submit to City, during both the Construction Documents Phase and the Construction Phase, monthly reports on the Work accomplished during the prior month. Each report shall also set forth the Contractor’s projected progress for the forthcoming month.
7.14 Other Reports. The Contractor will cooperate with City in preparing, or causing to be prepared, all or part of, periodic project reports required by state or federal agencies.
7.15 Notice of Labor Dispute.
7.15.1 If the Contractor has knowledge that any actual or potential labor dispute is delaying, or threatens to delay, the timely performance of Work on the 823
A2-84
Project, the Contractor shall immediately give written notice including all relevant information to City.
7.15.2 The Contractor agrees to insert the substance of this Article in any subcontract to which a labor dispute may delay the timely performance of Work on the Project, except that each subcontract shall provide that in the event its timely performance is delayed or threatened by delay by any actual or potential labor dispute, the Subcontractor shall immediately notify the next higher tier Subcontractor or the Contractor, as the case may be, of all relevant information concerning the dispute.
7.16 Documents and Samples At Project Site.
7.16.1 The Contractor shall maintain the following at its designated project office or, where appropriate, electronically and make them readily available to City and Contractor personnel at each active work site.
7.16.1.1 One current copy of the Contract Documents (including Construction Documents), in good order and marked to record current changes and selections made during construction.
7.16.1.2 One copy of the prevailing wage rates applicable to the Project.
7.16.1.3 The current accepted Project Schedule.
7.16.1.4 Shop Drawings, Product Data, and Samples.
7.16.1.5 All other required submittals.
7.17 Cutting, Fitting, and Patching. The Contractor shall do all cutting, fitting, or patching work required to make all parts of the Project come together properly and to allow the Project to receive or be received by the work of Separate Contractors shown upon, or reasonably implied by, the Contract Documents. The Contractor shall not endanger the Project, or adjacent property by cutting, digging, or otherwise. The Contractor shall not cut or alter the work of any Separate Contractor without the prior written consent of City’s Representative.
7.18 Access to Work. City, City’s Representative, their consultants, and other persons authorized by City will at all times have access to the Work on the Project wherever it is in preparation or progress. The Contractor shall provide safe and proper facilities for such access and for inspection.
7.19 Differing Site Conditions.
7.19.1 Definition. Differing Site Conditions means concealed or latent physical conditions or subsurface conditions at the Site that: (i) Contractor believes may be hazardous waste, as defined in Section 25117 of the Health and 824
A2-85
Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; (ii) materially differ from those indicated by information about the Site made available to Contractor by City prior to executing the Contract; or (iii) are of an unusual nature, differing materially from the conditions ordinarily encountered and generally recognized as inherent in the Work. The term Differing Site Conditions does not include, among other things, conditions of which Contractor had knowledge of as of the Effective Date of the Contract, including conditions that could reasonably have been known or discovered by Contractor as part of design Work, including, but not limited to, the Contractor’s analysis and validation of all information about the Site expressly provided by the City prior to the Effective Date of the Contract, including any reports, plans, or data identified in the Contract Documents as being made available for Contractor’s review.
7.19.1.1 City has not provided geotechnical or subsurface investigation data for the Project as of the date of this Contract. City shall arrange for the investigations described in Section 6.12.1, with costs charged against the Contractor’s budget within the Contract Price.
7.19.1.2 Design Development and Coordination Risk. Contractor assumes the risk of design development, coordination, and refinement necessary to complete the Project in accordance with the Contract Documents. Such design development, coordination, and refinement shall not constitute a basis for adjustment to the Contract Price or Contract Time, except where the City directs a material change to the scope of the Project.
7.19.2 If the Contractor encounters a Differing Site Condition, Contractor shall promptly notify City’s Representative in writing within three (3) Days and before disturbing the conditions.
7.19.3 The written notice from Contractor shall describe the specific Differing Site Condition encountered and demonstrate that a Differing Site Condition exists, why Contractor could not reasonably have worked around the Differing Site Condition, and how the Differing Site Condition adversely impacted the Contract Price or Contract Time.
7.19.4 City shall promptly investigate the conditions and, if it finds that there is a Differing Site Condition that causes an increase in the Contract Price or Contract Time, shall issue a Change Order under the procedures described in these General Conditions.
7.19.5 In the event that a dispute arises between City and Contractor as to whether there is a Differing Site Condition or whether it causes an increase in the Contract Price or Contract Time, Contractor shall proceed with the Work pending resolution of the dispute. Contractor shall retain any and all rights 825
A2-86
provided either by contract or by law which pertain to the resolution of disputes and protests between the Parties.
7.19.6 Except as otherwise provided for in the Contract, the Contractor agrees:
7.19.6.1 To bear the risk of concealed or unknown conditions, if any, other than Differing Site Conditions, which may be encountered in performing the Contract, as described in the Contract
Documents, and/or can reasonably be inferred by the Contractor based on its experience and expertise; and
7.19.6.2 That the Contractor’s Contract Price for the Contract was made with full knowledge of this risk.
7.20 Liability for and Repair of Damaged Work. Subject to California Public Contract Code § 7105 and other applicable law, Contractor shall be liable for any and all damages and losses to the Project (whether by fire, theft, vandalism, earthquake, flood or otherwise) prior to City’s acceptance of the Project as fully completed, except to the extent such loss or damage is caused by the acts, omissions, negligence, or willful misconduct of City or its officers, employees, consultants, contractors or agents. Contractor shall not be responsible under this Section for loss of or damage to an identified portion of the Project after the City has taken control of that portion in writing, except to the extent caused by Contractor or arising from defective or nonconforming Work.
7.21 Environmental Quality Protection.
7.21.6 Landscape and Vegetation Preservation. The Contractor shall exercise care to preserve the natural landscape and vegetation, and shall conduct operations so as to prevent unnecessary destruction, scarring, or defacing of the natural surroundings in the vicinity of the Work. Movement of crews and equipment within the rights-of-way and over routes provided for access to the Work shall be performed in a manner to prevent damage to property.
When no longer required, construction roads shall be restored to original contours. Upon completion of the Work, and following removal of construction facilities and required cleanup, land used for construction purposes and not required for the completed installation shall be scarified and regraded, as required, so that all surfaces are left in a condition that will facilitate natural revegetation, provide for proper drainage, and prevent erosion.
7.22 Protected Species. If, in the performance of the Work, evidence of the possible occurrence of any Federally listed threatened or endangered plant or animal is discovered, the Contractor shall notify the City Representative immediately, giving the location and nature of the findings. Written confirmation of the evidence, location and nature of the findings shall be forwarded to City within 2 Days. The Contractor shall immediately cease all construction activities in the 826
A2-87
immediate area of the discovery to the extent necessary to protect the endangered plant or animal. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or alter its performance to ensure full compliance with all applicable permits, laws and regulations. Any City directed changes to the Work as a result of a siting will be pursuant to the Contract Documents. Any costs or delays incurred by City or the Contractor due to unreasonable or false notification of an endangered plant or animal will be borne by the Contractor.
7.23 Preservation of Historical and Archeological Resources. If, in the performance of the Work, Contractor should unearth cultural resources (for example, human remains, animal bones, stone tools, artifacts and/or midden deposits) through excavation, grading, watering or other means, the Contractor notify the City Representative immediately, giving the location and nature of the findings. The Contractor shall immediately cease all construction activities in the immediate area of the discovery to the extent necessary to protect the cultural resource. If directed by the City Representative, Contractor will refrain from working in the immediate area, suspend the Work in its entirety, or re-sequence and/or alter its performance to ensure full compliance with all applicable permits, laws and regulations. The Contractor shall provide such cooperation and assistance as may be necessary to preserve the cultural resources for removal or other disposition. Any City directed changes to the Work as a result of the cultural resource will be pursuant to the Contract Documents. Should Contractor, without permission, injure, destroy, excavate, appropriate, or remove any cultural resource on or adjacent to the Site, it will be subject to disciplinary action, arrest and penalty under applicable law. The Contractor shall be principally responsible for all costs of mitigation and/or restoration of cultural resources related to the unauthorized actions identified above. Contractor shall be required to pay for unauthorized damage and mitigation costs to cultural resources (historical and archeological resources) as a result of unauthorized activities that damage cultural resources and shall indemnify City pursuant to the Contract Documents.
7.24 Technical Manuals; Spare Parts.
7.24.1 The Contractor shall submit technical operation and maintenance information for each item of mechanical, electrical and instrumentation equipment in an organized manner in the Technical Manual. It shall be written so that it can be used and understood by City’s operation and maintenance staff. The Contractor shall furnish to City six (6) identical Technical Manuals. Each set shall consist of one or more volumes, each of which shall be bound in a standard binder.
7.24.2 The Contractor shall furnish to City six (6) identical sets of spare parts information for all mechanical, electrical, and instrumentation equipment.
The spare parts list shall include the current list price of each spare part.
The spare parts list shall include those spare parts which each 827
A2-88
manufacturer recommends be maintained by City in inventory. Each manufacturer or supplier shall indicate the name, address, and telephone number of its nearest outlet of spare parts to assist City in ordering. The Contractor shall cross-reference all spare parts lists to the equipment numbers designated in the Contract Documents. The spare parts lists shall be bound in standard size, 3-ring binder.
8. OTHER WORK AT THE PROJECT SITE
8.1 Coordination With Separate Contractors.
8.1.1 Nothing contained in the Contract Documents shall be interpreted as granting to Contractor exclusive occupancy at the Project site. City reserves the right to award separate contracts for, or to perform with its own forces, construction or operations related to the Work or other construction or operations at or affecting the Project site, including portions of Work on the Project which have been deleted by Change Order. The Contractor shall cooperate with City’s employees or through other direct contracts, or have other work performed by utility owners (collectively, “Other Contractors”). If such other work is not noted in the Contract Documents, then written notice thereof will be given to the Contractor prior to starting any such other work.
The Contractor shall participate with City and Separate Contractors in joint review of construction schedules and Project requirements when directed to do so. The Contractor shall make necessary revisions to the Project Schedule after such joint review.
8.1.2 Contractor shall be solely responsible for all costs associated with coordinating its Work with Separate Contractors. Contractor shall not be entitled to additional compensation from City for costs or damages resulting from simultaneous or concurrent Work by Separate Contractors, except to the extent the delay is attributable to City as provided in this Section. If necessary to avoid or minimize such damage or delay, Contractor shall redeploy its work forces to other parts of the Work, or adjust its Work schedule including reasonable acceleration of the Work. If a portion of the Work on the Project is dependent upon the proper execution or results of other construction or operations by City or Separate Contractors, the Contractor shall inspect such other design or construction or operations before proceeding with that portion of the Work on the Project. The Contractor shall promptly report to City’s Representative apparent discrepancies or defects which render the other design, construction or operations unsuitable to receive the Work on the Project. Unless otherwise directed by City’s Representative, the Contractor shall not proceed with the portion of the Work on the Project affected until apparent discrepancies or defects have been corrected. Failure of the Contractor to so report within a reasonable time after discovering such discrepancies or defects shall constitute an acknowledgment that the other construction or operations by 828
A2-89
City or Separate Contractors is suitable to receive the Work on the Project, except as to defects not then reasonably discoverable. City shall use reasonable efforts to coordinate work performed by City or under its separate contracts to avoid materially interfering with Contractor’s scheduled access to the Work. If such work causes a delay for which City is responsible, Contractor may request an adjustment to Contract Time or Contract Price in accordance with the Contract’s notice and change order procedures, subject to the applicable requirements for establishing the delay and its impact.
8.1.3 Contractor shall afford each Separate Contractor proper and safe access to the Project site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others’ work with the written consent of City’s Representative and the others whose work will be affected.
8.1.4 If the proper execution or results of any part of Contractor’s Work depends upon work performed by Separate Contractors, Contractor shall inspect such other work and promptly report to City’s Representative in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor’s Work.
Contractor’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor’s Work except for latent defects and deficiencies in such other work.
8.1.5 If any claims are made by Separate Contractors arising out of Contractor’s performance of the Work, Contractor shall be responsible to immediately resolve the dispute and indemnify City pursuant to the Contract Documents.
8.1.6 City’s Representative shall arrange meetings with Separate Contractors performing work to plan coordination of construction activities but will not be responsible to direct coordination efforts. Any difference or conflict arising between Contractor and any Separate Contractor shall be submitted to City’s Representative for a decision in the matter. Contractor shall comply with direction from City’s Representative whose decision on coordination matters will be final.
8.2 For Delays by Others. By entering into this Contract, Contractor acknowledges that there may be Separate Contractors on the Project site whose work will be coordinated with that of Contractor. Contractor expressly warrants and agrees that Contractor will cooperate with Separate Contractors and will do nothing to delay, 829
A2-90
hinder, or interfere with the work of Separate Contractors, City, or City’s Representative. If Contractor’s Work is hindered, delayed, interfered with, or otherwise affected by a Separate Contractor, Contractor’s remedy shall be against the Separate Contractor, except to the extent the delay is attributable to the City or Contractor has a remedy against the City under this Contract or applicable law.
Any request for an adjustment to Contract Price or Contract Time shall comply with the Contract’s notice and change order procedures.
8.3 Contractor’s Delay or Damage. Contractor shall be liable to City and any Separate Contractor for the direct delay and disruption costs or damages incurred by such Separate Contractor as a result of Contractor’s wrongful action or inactions.
9. SUBCONTRACTORS
9.1 Award of Subcontracts and Other Contracts for Portions of The Work.
9.1.1 All Subcontractors shall be retained in accordance with the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100 et seq.). The Contractor shall not, without the consent of City: substitute any person or entity as a Subcontractor in place of the Subcontractor designated in the Proposal; or permit any such Subcontractor to be assigned or transferred, or allow the Work to be performed by any person or entity other than the Subcontractor listed in the Contractor’s Proposal. Any assignment or substitution made without the prior written consent of the awarding authority or not in compliance with the Subletting and Subcontracting Fair Practices Act shall be void, and the assignees shall acquire no rights in the Contract. Any consent, if given, shall not relieve the Contractor or its Subcontractors from their obligations under the terms of the Contract. All requests by the Contractor for substitution will be handled through City’s Representative.
9.1.2 The Contractor shall submit to City’s Representative after selecting Subcontractors pursuant to an open and competitive process, an updated expanded list of Subcontractors, along with their respective addresses, telephone numbers, e-mail addresses and contractor’s license numbers.
The expanded list of Subcontractors shall be provided and/or updated no later than ten (10) Days after the date which the Contractor awards a contract for any portion of the Work to a Subcontractor not originally listed in the Contractor’s Proposal.
9.1.3 City has the right to request all documentation that supports the Contractor’s selection of a Subcontractor. City shall have the right to review the qualifications of any Subcontractor proposed to perform Work on the Project. City may determine that a Subcontractor is not qualified to perform Work on the Project if City or City’s Representative determines that the 830
A2-91
Subcontractor does not meet the requirements of the Contract Documents or otherwise lacks the qualifications, experience, or capacity necessary to perform the Work.
9.1.4 Any increase in the cost of the Work on the Project resulting from the replacement or substitution of a Subcontractor pursuant to this Article or as required by City or City’s Representative pursuant to this Article, shall be borne solely by the Contractor. The Contractor shall not be entitled to any increase in Contract Price or an extension of Project Completion Date due to such replacement or substitution.
9.1.5 Any part of the Work on the Project performed for the Contractor by a Subcontractor shall be pursuant to a written subcontract. Each such subcontract shall require the Subcontractor, to the extent of the work to be performed by the Subcontractor, to be bound to the Contractor by the terms of the Contract Documents, to assume toward the Contractor all the obligations and responsibilities which the Contractor assumes towards the City by the Contract Documents, and to perform such portion of the work on the Project in accordance with the Contract Documents. Each such subcontract shall preserve and protect the rights of the City under the Contract Documents, with respect to the work to be performed by Subcontractor, so that subcontracting thereof will not prejudice such rights.
The Contractor is responsible for reviewing and coordinating the Work of its Subcontractors and Design Professionals. Nothing contained in this Article shall create any contractual relationship between the City and any Subcontractor.
9.2 Contingent Assignment of Subcontracts.
The Contractor hereby assigns to City all its interest in first tier subcontracts now or hereafter entered into by the Contractor for performance of any part of the Work on the Project. The assignment will be effective upon acceptance by City in writing and only as to those subcontracts which City designates in writing. City may accept said assignment at any time during the course of the Work on the Project and prior to Final Completion in the event of a suspension or termination of the Contractor’s rights under the Contract Documents. Such assignment is part of the consideration to City for entering into the Contract with the Contractor and may not be withdrawn prior to Final Completion.
10. CHANGE IN CONTRACT PRICE; CHANGE IN CONTRACT TIMES
10.1 Contract Change Orders.
10.1.1 City, without invalidating the Contract, may order changes in the work consisting of additions, deletions or other revisions, and the Contract Price and/or Contract Time shall be adjusted accordingly. All such changes in the Work shall be authorized by written Change Order and shall be 831
A2-92
performed under the applicable conditions of the Contract Documents. A Change Order signed by the Contractor indicates the Contractor’s agreement therewith, including any adjustment in the Contract Price and/or Contract Time, and the full and final settlement of all costs (direct, indirect and overhead) related to the work authorized by the Change Order. No changes in the Work covered by this Contract shall exonerate any surety or any bond given in connection with this Contract. For changes within the general scope of the Contract, Contractor shall proceed with the changed Work upon receipt of a written City directive issued in accordance with Section 10.2.1.2, notwithstanding a disagreement concerning compensation or Contract Time. Performance of the directed Work shall not constitute acceptance of the City’s determination or waiver of Contractor’s right to pursue an adjustment under the Contract’s notice, change order, and claims procedures. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract Documents, and shall be subject to all terms, conditions and provisions of the original Contract Documents.
10.1.2 Contractor shall perform City-directed changes within the general scope of the Contract in accordance with Sections 10.2.1.2 and 10.3.6. Changes materially outside the general scope of the Contract shall require mutual written agreement before Contractor is obligated to perform them. All claims for additional compensation or time shall be presented in writing. No claim will be considered after the work in question has been done unless a written Change Order has been issued or a timely written notice of claim has been made by Contractor. Contractor shall not be entitled to anticipated profit on Work omitted or deleted by City. A City-directed deletion shall, however, be addressed through a Change Order that accounts for reasonable, documented costs properly incurred for the deleted Work before Contractor received written notice of the deletion, including completed design or fabrication and materials that cannot reasonably be canceled or repurposed. Any adjustment shall account for amounts already paid and costs avoided through reasonable mitigation. Contractor shall deliver to City, upon request, any materials or work product for which City pays under the Change Order.
10.2 Contract Change Order Procedures.
10.2.1 City Directive.
10.2.1.1 The City may direct changes in the Work, including deletion of Work, by delivering a written work directive. To the extent the work directive results in a change to the Contract Price and/or Contract Time, Contractor must timely submit a Change Order Request and comply with all Change Order procedures in
accordance with this Article. Notwithstanding issuance of a work 832
A2-93
directive, Contractor’s failure to timely submit a Change Order Request shall constitute a waiver by Contractor of any adjustment to the Contract Price and/or Contract Time for work performed under the directive. The City shall not be liable to Contractor for work performed or omitted by Contractor in reliance on verbal orders.
10.2.1.2 Before directing changed Work, the City and Contractor shall make reasonable efforts to agree on the adjustment to Contract Price and Contract Time. If agreement cannot be reached, the City may issue a written directive for changes within the general scope of the Contract. The directive shall describe the changed Work, identify any interim adjustment to Contract Time, and establish an interim payment basis using agreed pricing or, absent agreement, the City’s reasonable determination under Article 10. Contractor shall maintain supporting cost records, and the City shall make interim payments through the regular progress payment process. The interim amounts shall be subject to final adjustment by agreement or resolution under the Contract’s claims procedures. Neither issuance of the directive nor performance or payment of the changed Work shall waive either Party’s position concerning the final adjustment.
10.3 Contractor Change Order Requests
10.3.1 The Contractor and City acknowledge that a purpose of this Contract is to minimize the risk and occurrence of Change Orders.
10.3.2 The Contractor may request changes to the Contract Price and/or Contract Time for City directed changes in the Work or for Additional Work caused by the acts, errors, or omissions of the City, or caused by unforeseen conditions if, and only if, the Contractor follows the procedures specified in this Article. Work that should or could have been included as part of the Construction Documents or work resulting from ambiguities in the Construction Documents shall not be considered Additional Work and the City will not issue a Change Order for said work.
10.3.3 If Contractor intends to initiate a Change Order Request, then Contractor shall provide the City with written notice of the underlying facts and circumstances that give rise to the proposed change. Contractor shall submit the notice of change or delay prior to performing the affected Work and no later than five (5) Business Days after the City’s directive or discovery of the circumstances giving rise to the request. To be considered valid and complete, the notice of change/delay shall include a general statement of the circumstances giving rise to the notice of change/delay and a reasonable order of magnitude estimate of the additional costs and/or 833
A2-94
time. If the circumstances give rise to both a cost adjustment and time extension, Contractor shall submit the notice of change and notice of delay concurrently.
10.3.4 A Change Order Request will only be deemed timely submitted if it is submitted within fourteen (14) Days after Contractor’s notice of change or delay and before Contractor incurs expenses arising from the change, except when Contractor proceeds pursuant to a written City directive under Section 10.2.1.2. In that event, incurring expenses before submission of the Change Order Request shall not invalidate the request, provided Contractor complies with the applicable notice and submission deadlines. For a City-directed deletion under Section 10.1.2, Contractor may include costs properly incurred before receiving written notice of the deletion, provided Contractor submits its Change Order Request within that fourteen (14) Day period.
10.3.5 A Change Order Request must state that it is a Change Order Request, state and justify the reason for the request, and specify the amount of any requested adjustment to the Contract Price and/or Contract Time, if any.
The Change Order Request shall include all of the following information (unless inapplicable to the change): A detailed description of the circumstances giving rise to the request; A complete itemized cost proposal, including itemized pricing for costs; Supporting documentation for all costs; A time impact analysis showing the impact of the delay to the critical path to completion; If any added costs or information cannot be determined at the time of the Change Order Request, the reason the costs or information cannot be determined at the time; and Certification to the accuracy of the Change Order Request under penalty of perjury. The time impact analysis shall be in the critical path method format and shall show the sequencing of all critical and non-critical new activities and/or activity revisions affected by the delay, with logic ties to all affected existing activities noted on the schedule. The City may demand, and Contractor shall provide, any additional information supporting the Change Order Request, including but not limited to native electronic format version of schedules and time impact analyses. Contractor shall provide the requested additional information within five (5) Business Days of the request.
10.3.6 If the City denies the Change Order Request or disagrees with the proposal submitted by Contractor, it will notify the Contractor, and the City will provide its opinion of the appropriate change to the Contract Price and/or Contract Time. The City and Contractor will then use their best efforts to negotiate a resolution. If agreement cannot be reached, the City may direct changes within the general scope of the Contract in accordance with Section
10.2.1.2, and Contractor shall proceed under the interim payment provisions of that Section. Contractor may pursue any disputed adjustment to Contract Price or Contract Time under the Contract’s claims procedures. 834
A2-95
Contractor’s performance of the directed Work or acceptance of interim payment shall not constitute settlement of the disputed adjustment.
10.4 Change Order Formal. The City may designate the forms to be used for notices, Change Order Requests, and Change Orders. If so designated, Contractor may only use such forms. Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the Change Order. No Claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s Change Order form in an attempt to reserve additional rights.
10.5 Determining Adjustments to Compensation.
10.5.1 Limitation on Costs.
10.5.1.1 Contractor shall not be entitled to any compensation for Work subject to a Change Order except as expressly set forth in this Article. Except for Contractor-manufactured signs priced under Section 10.12.1, the mark-up allowed under Section 10.12 shall constitute the entire allowance for general administrative overhead and profit associated with Additional Work.
Reasonable, documented direct costs specifically attributable to the changed Work may be separately compensated as permitted by this Article. No cost, overhead, or profit shall be recovered more than once.
10.5.2 Lump Sum Change Orders.
10.5.2.1 Whenever possible, any changes affecting compensation shall be in a lump sum mutually agreed by the Contractor and the City.
10.6 Time and Materials Change Orders. The City may direct the Contractor to proceed with the Additional Work with payment to be made on the basis of actual cost of the labor and materials required to complete the Additional Work. If the Project is federally funded, a time and materials Change Order shall only be issued after a determination that no other Change Order is suitable and the Change Order shall include a ceiling price that the Contractor exceeds at its own risk.
10.7 Federally Funded Projects. If the Project is Federally funded, for any change in price to the Contract, general and administrative expenses shall be negotiated and must conform to the cost principles set forth under at 2 C.F.R. Part 200, subpart E, and profit shall be negotiated as a separate element of the cost. To establish a fair and reasonable profit, consideration must be given to the 835
A2-96
complexity of the Additional Work to be performed, the risk borne by the Contractor, the Contractor's investment, the amount of subcontracting, the quality of its record of past performance, and industry profit rates in the surrounding geographical area for similar work.
10.8 Allowed Costs. Estimates for lump sum quotations and accounting for time-and-material work shall be limited to direct expenditures necessitated specifically by the change and shall be segregated as follows:
10.9 Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the Additional Work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from federal, state or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the Additional Work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental.
10.10 Materials. The cost of materials reported shall be at the lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight and delivery. Materials costs shall be based upon supplier or manufacturer’s invoice.
10.11 Tool and Equipment Use.
10.11.1 Regardless of ownership, the rates to be used in determining equipment use shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, at the time the work is performed. The Contractor shall furnish cost data supporting the establishment of the rental rate. The rental rate to be applied for use of each items of equipment shall be the rate resulting in the least total cost to the City for the total period of use. The City shall the make the final determination as to an equitable rental rate for the equipment. No payment will be made for the use of small tools, which have a replacement value of $1,000 or less.
10.11.2 The rental time to be paid for equipment shall be the time the equipment is in productive operation on the Additional Work being performed. Rental time will not be allowed while equipment is inoperative due to breakdowns.
10.11.3 All equipment shall, in the opinion of the City, be in good working condition and suitable for the purpose for which the equipment is to be used.
Equipment with no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer.
836
A2-97
10.11.4 Before construction equipment is used on any Additional Work, the Contractor shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the City, in duplicate, a description of the equipment and its identifying number.
10.11.5 When hourly rates are listed, any part of an hour less than 30 minutes of operation shall be considered to be 1/2-hour of operation, and any part of an hour greater than 30 minutes will be considered one hour of operation.
When daily rates are listed, any part of a day less than 4 hours operation shall be considered to be 1/2-day of operation.
10.12 Allowed Mark-up. The allowed mark-up for overhead and profit on Work added to the Contract shall be determined in accordance with Sections 10.12.2 through 10.12.7, except for agreed prices for Contractor-manufactured signs and sign components under Section 10.12.1. Costs separately compensated as direct costs shall not also be recovered through mark-up.
10.12.1 Contractor-Manufactured Signs. Notwithstanding the cost documentation requirements of this Article, Contractor-manufactured signs and sign components may be priced using mutually agreed fixed unit prices or lump-sum quotations. Contractor shall identify quantities, specifications, unit or lump-sum prices, and the work included in each quotation, and provide reasonably available information supporting price reasonableness, such as comparable Contract prices or prices for similar products. Contractor shall not be required to disclose its internal fabrication costs, manufacturing methods, or internal profit margins for these agreed prices. Such prices shall include fabrication-related overhead and profit, shall not be subject to the percentage mark-up limitations below, and shall receive no additional mark-up.
Separately priced installation, foundations, electrical work, landscaping, irrigation, and other site work shall remain subject to the applicable cost documentation and mark-up provisions of this Article. If the parties have not agreed on a fixed manufacturing price, this exception shall not establish the amount payable for disputed Work.
10.12.2 “Net Cost” is defined as the actual costs of labor, materials and tools and equipment only, excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and Subcontractors at cost only, without mark-up. Except for agreed manufacturing prices under Section 10.12.1, Contractor shall provide the City with documentation of the costs, including but not limited to payroll records, invoices, and such other information as the City may reasonably request.
10.12.3 For Work performed by the Contractor’s forces the allowed mark-up shall not exceed fifteen (15%) percent of labor costs, ten percent (10%) of material costs, and ten percent (10%) of the cost of tools and equipment use.
837
A2-98
10.12.4 For Work performed by a Subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the Subcontractor’s Net Cost of the Work to which the Contractor may add up to five percent (5%) of the Subcontractor’s Net Cost.
10.12.5 For Work performed by a sub-subcontractor, the added cost for overhead and profit shall not exceed fifteen percent (15%) of the sub-subcontractor’s Net Cost for Work to which the Subcontractor and Contractor may each add up to an additional five percent (5%) of the Net Cost of the lower tier subcontractor.
10.12.6 No additional mark-up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by the City exceed twenty percent (20%) of the Net Cost as defined herein, of the party that performs the Work.
10.12.7 Calculation of the mark-up shall comply with Sections 10.12.2 through 10.12.6. Mark-up shall not be applied to another party’s mark-up.
10.13 Documentation of Time-and-Material Costs.
10.13.1.1 T&M Daily Sheets.
Contractor must submit timesheets, materials invoices, records of equipment hours, and records of rental equipment hours to the City’s for an approval signature each day that Work is performed on a time-and-material basis. The Engineer’s signature on time sheets only serves as verification that the Work was performed and is not indicative of the City’s agreement to Contractor’s entitlement to the cost.
10.13.1.2 T&M Summary Sheet.
Contractor shall submit a T&M Summary Sheet, which shall include total actual costs, within five (5) Days following completion of Additional Work on a time-and-material basis. Contractor’s total actual cost shall be presented in a summary table in an electronic spreadsheet file by labor, material, equipment, and any other costs, along with documentation supporting the costs. Contractor’s failure to submit the T&M Summary Sheet within five (5) Days of completion of the Additional Work will result in Contractor’s waiver for any reimbursement of any costs associated with the Additional Work.
838
A2-99
10.14 Excluded Costs.
Except as expressly permitted below or required by applicable law, the following costs shall not be separately reimbursable in Change Orders. This Section does not require disclosure of internal fabrication costs or profit included in agreed manufacturing prices under Section 10.12.1. General administrative costs shall be covered by the applicable mark-up. Reasonable, documented incremental design, engineering, field supervision, surveying, temporary facilities, and other direct costs specifically required by changed Work may be separately compensated when expressly identified in an agreed Change Order or a City directive under Section 10.2.1.2, provided they are not already included in another price, rate, or mark-up.
10.14.1 Overhead Cost.
Payroll costs and other compensation of Contractor’s officers, executives, principals, general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, timekeepers, clerks, and other personnel employed by Contractor whether at the Site or in Contractor’s principal office or any branch office, material yard, or shop for general administration of the Work. This exclusion applies to general administration and does not exclude incremental direct services expressly permitted under the introductory paragraph of Section 10.14.
10.14.2 Office Expenses.
Expenses of Contractor’s principal and branch offices.
10.14.3 Capital Expenses.
Any part of Contractor’s capital expenses, including interest on Contractor’s capital employed for the Additional Work and charges against Contractor for delinquent payments.
10.14.4 Negligence.
Costs due to the negligence of Contractor or any Subcontractor or Supplier, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including without limitation the correction of Defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property.
10.14.5 Small Tools.
Cost of small tools valued at less than $1,000 and that remain the property of Contractor.
10.14.6 Administrative Costs.
839
A2-100
Costs associated with preparing Change Order proposals and estimates shall be included in the applicable mark-up unless a separate allowance is expressly authorized in writing by City. Costs of preparing, filing, negotiating, or prosecuting Claims or disputes shall not be separately reimbursable, except as required by applicable law.
10.14.7 Anticipated Lost Profits.
Expenses of Contractor associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings, or unpaid retention.
10.14.8 Home Office Overhead.
Costs derived from the computation of a “home office overhead” rate by application of the Eichleay, Allegheny, burden fluctuation, or other similar methods.
10.14.9 Special Consultants and Attorneys.
Costs of special consultants or attorneys, whether or not in the direct employ of Contractor, employed for services specifically related to the resolution of a Claim, dispute, or other matter arising out of or relating to the performance of the Additional Work.
10.14.10 Other.
Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in the Contract Documents; including but not limited to: submittals, drawings, field drawings, shop drawings, including submissions of drawings; field inspection; general superintendence; computer services; reproduction services; salaries of project engineer, superintendent, timekeeper, storekeeper, and secretaries; janitorial services; small tools, incidentals and consumables; temporary on-site facilities (offices, telephones, high speed internet access, plumbing, electrical power, lighting; platforms, fencing, water); surveying; estimating; protection of work; handling and disposal fees; final cleanup; other incidental work; related warranties; insurance and bond premiums. The foregoing exclusions shall not prohibit reimbursement of incremental direct costs expressly permitted under the introductory paragraph of Section
10.14. Insurance and bond premiums directly attributable to Additional Work shall be reimbursable as provided in Section 10.12.2.
10.14.1 Compliance with Federal Cost Principles.
If the Project is federally funded, any costs that are not allowable, reasonable and allocable to the Project, under generally accepted accounting principles and the applicable federal requirements. 840
A2-101
10.15 Contractor’s Wavier of Further Relief.
10.15.1 Contractor’s failure to provide a complete and timely notice of a change/delay and Change Order Request, or to comply with any other requirement of this Article, shall constitute a waiver by Contractor of the right to an adjustment of the Contract Price and/or Project Completion Date arising from such circumstances. Contractor further waives any right to additional recourse or recovery related to such change through the claims or dispute resolution procedures set forth in the Contract Documents or through any other legal process available under Applicable Law.
10.15.2 Contractor recognizes and acknowledges that timely submission of a formal written notice of change/delay and Change Order Request, whether or not the circumstances of the change may be known to the City or available to the City through other means, is not a mere formality but is of crucial importance to the ability of the City to promptly identify, prioritize, evaluate and mitigate the potential effects of changes. Any form of informal notice, whether verbal or written (including, without limitation, statements in requests for information, statements in Submittals, statements at any job meeting or entries on monthly reports, daily logs or job meeting minutes), that does not strictly comply with the formal requirements of this Article, shall accordingly be insufficient.
10.16 City Reservation of Rights.
10.16.1 By signing the Contract, the parties agree that City has the right to do any or all of the following, which are reasonable and within the contemplation of the parties:
10.16.1.1 To order changes in the Work, including without limitation:
Changes to correct errors or omissions caused by City, if any, in the Contract Documents; Changes resulting from City’s decision to change the Work subsequent to execution of the Contract; and Changes due to unforeseen conditions.
10.16.1.2 To suspend Work on the Project or any part thereof.
10.16.1.3 To delay Work on the Project, including without limitation, delays resulting from the failure of City or City’s Representative to timely perform any Contract obligation and delays for City’s
convenience.
11. TIME FOR COMPLETION; LIQUIDATED DAMAGES
11.1Contractor Progress. The Contractor shall proceed expeditiously with adequate forces and shall complete the Work by the Project Completion Date. If the City’s 841
A2-102
Representative determines that the Contractor’s progress is insufficient to achieve completion by the Project Completion Date, the City’s Representative may notify the Contractor in writing. Upon receipt of such notice, the Contractor shall immediately take all measures necessary, at no additional cost to the City, including overtime, additional shifts, or weekend or holiday work, to ensure timely completion of the Work.
11.2 Contractor Time. The Contract Time shall commence: (1) on the date stated in the Notice to Proceed, or (2) if the Notice to Proceed does not specify a commencement date, then on the date of the Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The City is under no obligation to consider early completion of the Project; and the Project Completion Date shall not be amended by the City’s receipt or acceptance of the Contractor’s proposed earlier completion date. Any difference in time between the Contractor’s early completion and the Project Completion Date shall be considered a part of the Project float. Contractor shall not be entitled to compensation, and the City will not compensate Contractor, for delays which impact early completion. Contractor shall not, under any circumstances, receive additional compensation from the City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Project Completion Date.
11.3 Liquidated Damages. If the Work is not completed as stated in the Contract Documents, it is understood that the City will suffer damage. In accordance with Government Code section 53069.85, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each calendar day of delay until the Work is fully completed, subject to the Force Majeure clause set forth herein and extensions of Contract Time to which Contractor is entitled under the Contract Documents. Liquidated damages shall apply only to the extent the delay is attributable to Contractor or its Subcontractors or Suppliers and shall not be assessed for periods of excusable delay for which Contractor is entitled to an extension of Contract Time, subject to the applicable notice and substantiation requirements. Concurrent delays shall be evaluated under the Contract’s concurrent-delay provisions.
Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages.
11.4 Extension of Time.
11.4.1 City-Caused Extension of Time. Contractor’s entitlement to an extension of Contract Time for a City-caused delay shall only be allowed when, and then only to the extent that, the City-caused delay extends the Critical Path beyond the Contract Time. The delay to the 842
A2-103
critical path must be established by a proper time impact analysis. City shall ascertain the facts and extent of delay and grant extension of time for completing the Work when, in its judgment, the facts justify such an extension. Contractor shall not be entitled to an adjustment of Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. If approved, the increase in time required to complete Work shall be added to the Contract Time.
11.4.2 Concurrent Delay. In the event of Concurrent Delay, the Contract Time may be extended, as determined by City, however, such delay is non-compensable and the Contract Price shall not be adjusted.
11.4.3 Inclement Weather. Contractor shall abide by City’s determination of what constitutes inclement weather. Extreme heat or high winds may constitute inclement weather when Contractor demonstrates that the conditions prevent safe performance of scheduled Work despite reasonable safety measures and practicable adjustments to work hours or sequencing, subject to City approval where required. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the applicable CPM Schedule.
11.4.4 Utility-Related Delays. If a delay to the critical path results from acts of public utilities or delays caused by failure of a public agency or owner of a utility to provide for removal or relocation of existing main or trunkline utility facilities or other known utility facilities, Contractor will be entitled to a time extension, but will not receive an adjustment to the Contractor Price or any other compensation.
11.5Force Majeure.
11.5.1 Contractor shall not be charged liquidated damages for delays resulting from a Force Majeure Event. If a Force Majeure Event delays the critical path of the Work, Contractor shall be entitled to a non-compensable extension of Contract Time. Such time extension shall be Contractor’s sole and exclusive remedy for delays caused by Force Majeure Events.
11.6No Damages for Reasonable Delay. The City’s liability to Contractor for delays for which the City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other 843
A2-104
ongoing costs. Any damages resulting from unreasonable delay by the City shall be limited to the Contractor’s actual, proven costs.
11.7Procedure for Time Extensions and Delay Damages. Contractor shall not be entitled to any extension of time unless Contractor properly notices the delay and adjustment to compensation and requests a Change Order in accordance with the Contract Documents. Contractor’s failure to timely and fully comply with the Change Order procedures in the Contract Documents shall constitute a waiver of Contractor’s right to a time extension.
12. TEST AND INSPECTIONS; CORRECTION, REMOVAL, OR ACCEPTANCE OF DEFECTIVE WORK; NOTICE OF DEFECTS
12.1 Notice of Defective Work. Prompt notice of Defective Work of which the City or City’s Representative has actual knowledge will be given to the Contractor.
Defective Work may be rejected, corrected, or accepted as provided in the Contract Documents.
12.2 Access to Work. City, City’s Representative, their consultants and other representatives and personnel, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Project site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor’s safety procedures and programs.
12.3 Tests and Inspections.
12.3.1 Contractor shall give City’s Representative timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests.
12.3.2 Except as provided by the Contract Documents, City shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents.
12.3.3 If Applicable Laws of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested, or approved by an employee or other representative of such public body, Contractor shall assume full responsibility for arranging and obtaining such inspections, tests, or approvals, pay all costs in connection therewith, and furnish City’s Representative the required certificates of inspection or approval.
12.3.4 Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, or approvals required for City and City’s Representative’s acceptance of materials or equipment to 844
A2-105
be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor’s purchase thereof for incorporation in the Work. Such inspections, tests, or approvals shall be performed by organizations acceptable to City.
12.3.5 City will provide inspection during normal working hours from 8:00 a.m. to 5:00 p.m. Monday through Friday. Inspection before or after this time will be charged to the contractor as reimbursable inspection time. Inspections on weekends requires two days’ notice for review and approval. Upon written request and approval the 8.5 hour working day may be changed to other limits subject to City ordinance.
12.4 Uncovering Work.
12.4.1 If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City’s Representative, Contractor shall, if requested by City’s Representative, uncover such Work for observation.
12.4.2 Uncovering Work shall be at Contractor’s expense unless Contractor has given City’s Representative timely notice of Contractor’s intention to cover the same and City’s Representative has not acted with reasonable promptness in response to such notice.
12.4.3 If Contractor has given City’s Representative timely notice of Contractor’s intention to cover the work and City’s Representative has not acted with reasonable promptness in response to such notice, and City’s Representative later considers it necessary or advisable that covered Work be observed by City’s Representative or inspected or tested by others, Contractor, at City’s Representative’s request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City’s Representative may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment.
12.4.4 If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and City shall be entitled to an appropriate decrease in the Contract Price.
12.4.5 If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price and/or an extension of the 845
A2-106
Contract Times, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction.
12.5 City May Stop The Work. If the Work is defective, City may, in its sole discretion, order the Contractor to stop the Work. All delays associated with the stop Work order will be the responsibility of the Contractor.
12.6 Correction of Defective Work.
12.6.1 Promptly after receipt of written notice, the Contractor shall (1) correct Defective Work that becomes apparent during the progress of the Work on the Project and (2) replace, repair, or restore to City’s satisfaction any other parts of the Work on the Project and any other real or personal property which is damaged or destroyed as a result of Defective Work or the correction of Defective Work. The Contractor shall promptly commence such correction, replacement, repair, or restoration upon notice from City’s Representative or City, but in no case later than fourteen (14) Days after receipt of such notice; and the Contractor shall diligently and continuously prosecute such correction to completion. The Contractor shall bear all costs of such correction, replacement, repair, or restoration, and all losses resulting from such Defective Work, including additional testing, inspection, and compensation for City’s Representative’s services and expenses. The Contractor shall perform corrective Work on the Project at such times that are acceptable to City and in such a manner as to avoid, to the extent practicable, disruption to City’s activities. When correcting Defective Work, the Contractor shall take no action that would void or otherwise impair any special warranty or guarantee applicable to the Work..
12.6.2 If immediate correction of Defective Work is required for life safety or the protection of property and is performed by City or Separate Contractors, the Contractor shall pay to City all reasonable costs of correcting such Defective Work. The Contractor shall replace, repair, or restore to City’s satisfaction any other parts of the Construction Work and any other real or personal property which is damaged or destroyed as a result of such Defective Work or the correction of such Defective Work.
12.6.3 The Contractor shall remove from the Project site portions of the Construction Work and materials which are not in accordance with the Contract Documents and which are neither corrected by the Contractor nor accepted by City.
12.6.4 Enforcement of the Contractor’s express warranties and guarantees to repair contained in the Contract Documents shall be in addition to and not in limitation of any other rights or remedies City may have under the Contract Documents or at law or in equity for Defective Work. Nothing contained in this Article shall be construed to establish a period of limitation 846
A2-107
with respect to other obligations of the Contractor under the Contract Documents.
12.7 Acceptance of Defective Work.
12.7.1 If, instead of requiring correction or removal and replacement of Defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to City’s evaluation of and determination to accept such Defective Work and for the diminished value of the Work.
12.7.2 If any acceptance of Defective Work occurs prior to release of the Project retention, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work and all costs incurred by City.
12.7.3 If the Project retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of retention to be paid to City.
12.7.4 If the acceptance of defective Work occurs after release of the Project retention, an appropriate amount will be paid by Contractor to City.
12.8 City May Correct Defective Work.
12.8.1 If the Contractor fails, within a reasonable time after written notice from the City’s Representative, to correct Defective Work, remove and replace rejected Work, perform the Work in accordance with the Contract Documents, or comply with any other provision of the Contract Documents, the City may, after seven (7) Days written notice to the Contractor, correct or remedy the deficiency.
12.8.2 In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s services related thereto, take possession of Contractor’s tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City and City’s Representative, and the agents, employees, other contractors, and consultants of each of them, access to the Site to enable City to exercise the rights and remedies to correct the defective work.
847
A2-108
12.8.3 All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by City correcting the defective work will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of Defective Work.
12.8.4 If the Change Order is executed after all payments under the Contract have been paid by City and the Project Retention is held in an escrow account as permitted by the Contract Documents, Contractor will promptly alert the escrow holder, in writing, of the amount of Retention to be paid to City.
12.8.5 If the Change Order is executed after release of the Project Retention, an appropriate amount will be paid by Contractor to City.
12.8.6 Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to City correcting defective work.
13. PAYMENTS TO CONTRACTOR AND COMPLETION
13.1 Schedule of Values.
The Contractor shall submit a schedule of values to the City before the first Application for Payment, allocating the entire Contract Price to the various portions of the Work. The schedule of values shall be prepared in the form, and supported by the data to substantiate its accuracy, required by the City. This schedule, unless objected to by the City, shall be used as the basis for reviewing the Contractor’s Applications for Payment. Any changes to the schedule of values shall be submitted to the City and supported by such data to substantiate its accuracy as the City may require, and unless objected to by the City, shall be used as a basis for reviewing the Contractor’s subsequent Applications for Payment.
13.2 Applications for Payments.
13.2.1 By the twenty-fifth (25th) day of each month, the Contractor shall submit to City’s Representative for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application for Payment and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location 848
A2-109
agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect City’s interest therein, all of which must be satisfactory to City.
13.2.2 Beginning with the second Application for Payment, each Application shall include an affidavit executed by the Contractor stating that it has paid all amounts due on account of the Work paid by City in the prior Applications for Payment.
13.3 Review of Applications.
13.3.1 City’s Representative will either indicate in writing a recommendation of payment to City or return the Application for Payment to Contractor indicating in writing City’s Representative’s reasons for refusing to recommend payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application for Payment.
13.3.2 In reviewing the Contractor’s Applications for Payment, the City shall be entitled to rely on the accuracy and completeness of the information furnished by the Contractor and shall not be deemed to have conducted a detailed examination, audit, or arithmetic verification of the documentation submitted in support of the Application for Payment. Such examinations, audits and verifications, if required by the City, will be performed by the City’s auditors acting in the sole interest of the City.
13.3.3 By recommending any such payment City’s Representative will not thereby be deemed to have represented that:
13.3.3.1 Inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City’s Representative in the Contract Documents; or
13.3.3.2 There may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor.
13.3.4 Neither City’s Representative’s review of Contractor’s Work for the purposes of recommending payments nor City’s Representative’s recommendation of any payment, including final payment, will impose responsibility on City’s Representative:
849
A2-110
13.3.4.1 To supervise, direct, or control the Work;
13.3.4.2 For the means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto;
13.3.4.3 For Contractor’s failure to comply with Applicable Laws applicable to Contractor’s performance of the Work;
13.3.4.4 To make any examination to ascertain how or for what purposes Contractor has used the moneys paid on account of the Contract Price; or
13.3.4.5 To determine that title to any of the Work, materials, or equipment has passed to City free and clear of any Liens.
13.3.5 City’s Representative may refuse to recommend the whole or any part of any payment due to subsequently discovered evidence or the results of subsequent inspections or tests. City retains the right to revise or revoke any such payment recommendation previously made, to such extent as may be necessary in City’s opinion to protect City from loss.
13.4 Payment Becomes Due. Thirty (30) Days after presentation of an undisputed and properly submitted Application for Payment to the City’s Representative, and subject to the City’s Representative’s recommendation, the amount recommended shall become due and, when due, shall be paid by the City to the Contractor.
13.5 Retention and Securities in Lieu of Retention.
13.5.1 Unless Project has been deemed substantially complex as noted in the Contract Documents, City will retain five percent (5%) of the amount invoiced in accordance with Applicable Laws.
13.5.2 Pursuant to Public Contract Code section 22300, Contractor may substitute securities for any moneys withheld as a retention by City to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with City, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to Contractor. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor.
13.5.3 Alternatively, Contractor may request, and City shall make payment of retentions earned directly to the escrow agent selected by the Contractor.
At the expense of Contractor, Contractor may direct the investment of the payments into securities and Contractor shall receive the interest earned on 850
A2-111
the investments upon the same terms provided for in Public Contract Code section 22300 for securities deposited by Contractor. Upon satisfactory completion of the Contract, Contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent when City authorizes the escrow agent to release these funds to the Contractor, pursuant to the terms of Public Contract Code section 22300.
13.5.4 Securities eligible for investment shall include those listed in Government Code section 16430, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by Contractor and City.
13.5.5 Contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon.
13.5.6 The escrow agreement shall be in the form of the Escrow Agreement provided as part of the Contract Documents.
13.6 City’s Reduction in Recommended Payment.
13.6.1 In addition to reductions recommended by City’s Representative, City may refuse to make payment of the full amount recommended by City’s Representative because:
13.6.1.1 Claims have been made against City on account of Contractor’s performance or furnishing of the Work.
13.6.1.2 Stop Payment Notices or Liens have been filed in connection with the Work.
13.6.1.3 Defective Work not remedied.
13.6.1.4 Failure of Contractor to make proper payments to its subcontractors or suppliers.
13.6.1.5 Completion of the Contract if there exists a reasonable doubt that the Work can be completed for the unpaid Contract balance.
13.6.1.6 Damage to another contractor or third party.
13.6.1.7 Amounts which may be due the City for claims against Contractor.
13.6.1.8 Failure of Contractor to keep the record (‘as-built”) drawings up to date.
851
A2-112
13.6.1.9 Failure to provide updates on the construction schedule.
13.6.1.10 Site cleanup.
13.6.1.11 Failure of the Contractor to comply with requirements of the Contract Documents.
13.6.1.12 Liquidated Damages.
13.6.2 Upon completion of the Contract, City will reduce the final Contract Price to reflect costs charged to the Contractor, back charges or payments withheld pursuant to the Contract Documents.
13.7 Contractor’s Warranty of Title. Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens.
13.8 Partial Utilization. City reserves the right to occupy or utilize any portion of the Work at any time before completion, and such occupancy or use shall not constitute acceptance of any part of the Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.
13.9 Final Inspection. Upon written notice from Contractor that the entire Work is complete, City’s Representative will promptly make a final inspection with City and Contractor and will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies.
13.10 Final Acceptance. After Contractor has, in the opinion of City’s Representative, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance, certificates of inspection, marked-up record documents, and other documents required by the Contract Documents, City shall execute and file with the County in which the Project is located a Notice of Completion, constituting final acceptance and completion of the Project, except as may be expressly noted.
13.11 Final Payment.
13.11.1 Application for Payment.
13.11.1.1 Upon execution of the Notice of Completion, Contractor may submit a final accounting for the cost of the Work and a final 852
A2-113
Application for Payment. Final payment shall constitute the entire unpaid balance of the Contract Price.
13.11.1.2 Prior to Final Payment, the City may conduct an audit of the Work or notify the Contractor that it will not conduct an audit and issue a final Certificate for Payment. If the City conducts an audit of the Work, the City will either issue to the Contractor a final Certificate for Payment, or notify the Contractor in writing of the City’s reasons for withholding a certificate. If the City’s auditors report the cost of the Work as substantiated by the Contractor’s final accounting to be less than claimed by the Contractor, the Contractor shall be entitled to make a claim. Pending a final resolution of the disputed amount, the City shall pay the Contractor the amount certified in the City’s final Certificate for Payment.
13.11.1.3 The final Application for Payment shall be accompanied (except as previously delivered) by:
13.11.1.3.1 All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance;
13.11.1.3.2 Consent of the surety to final payment;
13.11.1.3.3 A fully completed Conditional Waiver and
Release on Final Payment.
13.12 City’s Representative’s Review of Application and Acceptance. If, on the basis of City’s Representative’s observation of the Work during construction and final inspection, and City’s Representative’s review of the final Application for Payment and accompanying documentation as required by the Contract Documents, City’s Representative is satisfied that the Work has been completed and Contractor has satisfied all other requirements for final payment, City’s Representative will indicate in writing City’s Representative’s recommendation of payment and present the Application for Payment to City for payment. Otherwise, City’s Representative will return the Application for Payment to Contractor, indicating in writing the reasons for refusing to recommend final payment, in which case Contractor shall make the necessary corrections and resubmit the Application for Payment.
13.13 Payment Becomes Due. Within sixty (60) Days after presentation of the proper and complete final Application for Payment and accompanying documentation, the amount recommended by the City’s Representative, less any sums the City is entitled to set off pursuant to the Contract Documents, shall become due and shall be paid by the City to the Contractor. 853
A2-114
13.14 Waiver of Claims. The making and acceptance of final payment will constitute a waiver of all Claims by Contractor against City other than those previously made in accordance with the requirements herein and expressly acknowledged by City in writing as still unsettled.
14. SUSPENSION OF WORK; TERMINATION
14.1 City May Suspend Work.
14.1.1 City may, at its sole option, decide to suspend at any time the performance of all or any portion of the Work by notice in writing to Contractor. Such notice of suspension of Work will designate the amount and type of plant, labor, and equipment to be committed to the Project during the period of suspension. Contractor shall use its best efforts to utilize its plant, labor, and equipment in such a manner as to minimize costs associated with suspension.
14.1.2 Upon receipt of any such notice, Contractor shall, unless the notice requires otherwise:
14.1.2.1 Immediately discontinue Work on the date and to the extent specified in the notice;
14.1.2.2 Place no further orders or subcontracts for material, services, or facilities with respect to suspended Work other than to the extent required in the notice;
14.1.2.3 Promptly make every reasonable effort to obtain suspension upon terms satisfactory to City’s Representative of all orders, subcontracts, and rental agreements to the extent they relate to performance of Work suspended; and
14.1.2.4 Continue to protect and maintain the Work including those portions on which Work has been suspended.
14.1.3 Except as provided by this article, as full and complete compensation for such suspension, Contractor shall be granted an adjustment in the Contract Price based on a negotiated daily rate that reflects the Contractor’s actual costs associated with the demobilized condition of the Site and an extension of the Contract Times equal to the number of days performance of Work is suspended; provided, however, that no adjustment of Contract Price or 854
A2-115
extension of Contract Times shall be granted if the suspension results from Contractor's non-compliance with the requirements of the Contract.
14.1.4 Notwithstanding any other provision of the Contract Documents, when immediate action is necessary to protect life, safety, property, or to reduce significant exposure or liability, City may immediately order Contractor to cease all or any portion of the Work. Contractor shall immediately comply with such order and shall not resume the affected Work until directed by City. Any suspension ordered under this subsection shall be treated as a suspension of Work under this Article.
14.2 City May Terminate for Cause.
14.2.1 City may, without prejudice to any other right or remedy, serve written notice upon Contractor of its intention to terminate this Contract in whole or in part if the Contractor: (i) refuses or fails to prosecute the Work or any part thereof with such diligence as will ensure its completion within the Project Completion Date; (ii) fails to complete the Work within the required time; (iii) files a petition in bankruptcy, is adjudicated bankrupt, or becomes insolvent; (iv) makes a general assignment for the benefit of its creditors; (v) has a receiver appointed; (vi) refuses or fails to supply enough properly skilled workers or proper materials to complete the Work; (vii) fails to make prompt payment to subcontractors or for material or labor; (viii) disregards Applicable Laws, other requirements or instructions of City; or (ix) violates any of the provisions of the Contract Documents.
14.2.2 The Notice of Default and Intent to Terminate shall state the reasons for termination. Unless within five (5) Days after the service of such notice, Contractor resolves the circumstances giving rise to the Notice of Default to City’s satisfaction, or commences and diligently prosecutes corrective action acceptable to City, City may terminate this Contract. In such case, Contractor shall not be entitled to receive any further payment until the Work has been finished. City may take over and complete the Work by any method it may deem appropriate, including enforcement of the Project Performance Bond. Contractor and its surety shall be liable to City for any excess costs or other damages incurred by City to complete the Work. If City takes over the Work, City may, without liability for so doing, take possession of and utilize in completing the Work such materials, appliances, plant, and other property belonging to the Contractor as may be on the Site.
14.3 City May Terminate for Convenience.
14.3.1 In addition to its right to terminate this Contract for default, City may terminate the Contract, in whole or in part, at any time upon seven (7) Days written notice to Contractor. The Notice of Termination shall specify that the termination is for the convenience of City, the extent of termination, and 855
A2-116
the effective date of such termination (“Effective Date of Termination”). City shall exercise this right in good faith. Termination after substantial completion shall not reduce Contractor’s entitlement to payment at the applicable Contract prices for conforming Work performed before the Effective Date of Termination, including overhead and profit included in those prices, subject to prior payments and lawful deductions or offsets.
Compensation for remaining terminated Work and termination costs shall be determined under this Section 14.3.
14.3.2 After receipt of Notice of Termination, and except as directed by City, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this Termination for Convenience clause, immediately proceed with the following obligations:
14.3.2.1 Stop Work as specified in the Notice.
14.3.2.2 Complete any Work specified in the Notice of Termination in a manner that minimizes cost and time while maintaining the quality required by the Contract Documents.
14.3.2.3 Leave the Site and any other property upon which the Contractor was working in a safe and sanitary manner such that it does not pose any threat to the public health or safety.
14.3.2.4 Terminate all subcontracts and purchase orders to the extent that they relate to the portions of the Work terminated.
14.3.2.5 Place no further subcontracts or orders, except as necessary to complete the remaining portion of the Work.
14.3.2.6 Submit to City, within thirty (30) Days after the Contractor receives the Notice of Termination, all of the documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the Notice of Termination. Any documentation
substantiating costs incurred by the Contractor solely as a result of City's exercise of its right to terminate this Contract pursuant to this clause, which costs the Contractor is authorized under the Contract Documents to incur, shall: (i) be submitted to and received by City no later than forty-five (45) Days after Contractor receives the Notice of Termination; (ii) describe the costs incurred with particularity; and (iii) be conspicuously identified as "Termination Costs Occasioned by City's Termination for Convenience."
856
A2-117
14.3.3 City’s total liability to Contractor by reason of the termination shall be limited to the total (without duplication of any items) of:
14.3.3.1 The reasonable cost to the Contractor for all Work performed prior to the Effective Date of Termination, including the Work done to secure the Project for termination. Reasonable cost may not exceed the applicable percentage completion values derived from the progress schedule and the schedule of values. For purposes of this Section, Work performed includes documented off-site fabrication and assembly of signs, including partially completed signs, whether or not delivered or installed. The schedule of values shall separately identify fabrication and installation so the value of that Work can be determined.
Contractor shall deliver to City, upon request, any materials or partially completed Work for which City pays. Deductions shall be made for cost of materials to be retained by the Contractor, cost of Work defectively performed, amounts realized by sale of materials, and for other appropriate credits or offsets against cost of Work as allowed by the Contract Documents.
14.3.3.2 When, in City’s opinion, the cost of any item of Work is excessively high due to costs incurred to remedy or replace defective or rejected Work, reasonable cost to be allowed will be the estimated reasonable cost of performing the Work in compliance with requirements of the Contract Documents and excessive actual cost shall be disallowed.
14.3.3.3 Any Work required by the Termination for Convenience that is not included in Contract Documents will be negotiated pursuant to the Contract Change Order provisions.
14.3.3.4 Reasonable costs to the Contractor of handling material returned to vendors, delivered to City or otherwise disposed of as directed by City.
14.3.3.5 A reasonable allowance for the Contractor’s internal administrative costs directly related to termination closeout documentation required by this Article, excluding attorney fees and costs of preparing, negotiating, or prosecuting a claim or dispute.
14.3.3.6 The documented, nonrefundable portion of performance and payment bond premiums paid before Contractor received the Notice of Termination and reasonably allocable to the terminated Work, less any refund or credit and to the extent not already included in amounts paid for completed Work.
857
A2-118
14.3.4 In no event shall City be liable for unreasonable costs incurred by the Contractor or subcontractors after receipt of a Notice of Termination. Such non-recoverable costs include, but are not limited to, the cost of or anticipated profits on Work not performed as of the date of termination, post-termination employee salaries, unreasonable post-termination administrative expenses, post-termination overhead or unabsorbed overhead, surety costs other than the bond premiums expressly recoverable under Section 14.3.3.5, costs of preparing and submitting the Contractor’s termination claim, attorney fees of any type, and all other costs relating to prosecution of a claim or lawsuit.
14.3.5 City shall have no obligation to pay the Contractor under this Article unless and until the Contractor provides City with updated and acceptable as-builts and Record Documents for Work completed prior to termination as required by the Contract Documents.
14.3.6 In arriving at the amount due the Contractor under this clause there shall be deducted in whole, or in the appropriate part(s) if the termination is partial:
14.3.6.1 All unliquidated advances or other payments on account previously made to the Contractor, including without limitation all payments which are applicable to the terminated portion of the Contract Documents;
14.3.6.2 Any claim City may have against the Contractor in connection with the Work or any amounts that may be withheld in accordance with the Contract Documents; and
14.3.6.3 The agreed price for, or proceeds of sale of, any materials, supplies, or other things kept by the Contractor and not otherwise recovered by or credited to City.
14.3.7 Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss or consequential damages arising out of or resulting from such termination for Work not performed under the Contact.
14.3.8 Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, City may immediately order Contractor to cease Work until such safety or liability issues are addressed to the satisfaction of City or the Contract is terminated.
14.3.9 If City terminates Contractor for cause and the termination is subsequently determined, by written agreement of the Parties or a final decision under the Contract’s dispute-resolution procedures, to have been wrongful, the 858
A2-119
termination shall be treated as a termination for convenience under this Section 14.3. Except as provided below, Contractor’s recovery arising from the termination shall be limited to the amounts payable under this Section, without duplicate recovery. This conversion and limitation shall not apply if the same agreement or final decision establishes that City acted in bad faith or engaged in fraud or willful misconduct in effecting the termination. In that event, Contractor’s remedies shall be determined under applicable law.
Nothing in this Section shall limit liability or remedies that cannot lawfully be limited.
15. CLAIMS, DISPUTE AVOIDANCE AND RESOLUTION
15.1 Procedure for Resolving Claims. Contractor shall timely comply with any and all requirement of the Contract Documents pertaining to notices and requests for changes to the Contract Price and/or the Project Completion Date, including but not limited to all requirements of Article 9 and Article 14.1, as a prerequisite to filing any Claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely submit a Change Order Request, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the Claim under the Contract or at law.
15.2 Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Article shall be construed to be consistent with all applicable law, including but not limited to these statutes.
15.3 Claims. For purposes of this Article, “Claim” means a written demand by the Contractor for: (1) a time extension, including without limitation relief from damages or penalties for delay assessed by City, (2) payment of money or damages arising from Work done by or on behalf of the Contractor and payment of which is not otherwise expressly provided for or the Contractor is not otherwise entitled, or (3) payment of an amount which is disputed by City. A “Claim” does not include any demand for payment for which the Contractor has failed to provide notice, submit a Change Order Request, or otherwise failed to follow any procedures contained in the Contract Documents.
15.4 Filing Claims. Claims governed by this Article may not be filed unless and until the Contractor completes any and all requirements of the Contract Documents pertaining to notices and requests for changes to the Contract Price and/or the Project Completion Date, and Contractor’s request for a change has been denied in whole or in part. Claims governed by this Article must be filed no later than 859
A2-120
thirty (30) Days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the City and shall include on its first page the following words in 16 point capital font: “THIS IS A CLAIM.” The Claim shall include all information and documents necessary to substantiate the Claim, including but not limited to those identified below. Nothing in this Article is intended to extend the time limit or supersede notice requirements otherwise provided by Contract Documents.
Failure to follow such contractual requirements shall bar any Claims or subsequent proceedings for compensation or payment thereon.
15.5 Documentation.
15.5.1 The Contractor will submit the claim justification in the following format:
15.5.1.1 Summary description of Claim including basis of entitlement, merit and amount of time or money requested, with specific reference to the Contract Document provisions pursuant to which the Claim is made;
15.5.1.2 List of documents relating to the Claim;
15.5.1.3 Specifications;
15.5.1.4 Drawings;
15.5.1.5 Clarifications (Requests for Information);
15.5.1.6 Schedules; and
15.5.1.7 Other.
15.5.1.8 Chronology of events and correspondence;
15.5.1.9 Narrative analysis of Claim merit;
15.5.1.10 Analysis of Claim cost, including calculations and supporting documents;
15.5.1.11 Time impact analysis in the form required by the Contract Documents or, if the Contract Documents do not require a particular format, CPM format, if an adjustment of the Contract Time is requested; and
15.5.1.12 Cover letter and certification of validity of the Claim. 860
A2-121
15.6 City Response to Claim.
15.6.1 Upon receipt of a Claim pursuant to this Article, City shall conduct a reasonable review of the Claim and, within a period not to exceed 45 days of receipt of the Claim, or as extended by mutual agreement, shall provide a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the Claim will be processed and made within 60 days after City issues its written response.
15.6.2 If City needs approval from its governing body to provide Contractor a written statement as set forth above, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a Claim, City shall have up to three (3) days following the next publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide Contractor a written statement identifying the disputed portion and the undisputed portion of the Claim.
15.6.3 City may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the Claim or relating to defenses or Claims City may have. If additional information is needed thereafter, it shall be provided upon mutual agreement of the City and the Contractor. City’s written response shall be submitted 30 days (15 days if the Claim is less than $50,000) after receiving the additional documentation, or within the same period of time taken by the Contractor to produce the additional information, whichever is greater.
15.7 Meet and Confer Conference. If the Contractor disputes the City’s response, or if City fails to respond within the statutory time period(s), the Contractor may so notify City, in writing, within 15 days of the receipt of the response or the failure to respond, and demand an informal conference to meet and confer for settlement of those portions of the Claim that remain in dispute. Upon such demand, City shall schedule a meet and confer conference within 30 Days.
15.8 Mediation.
15.8.1 Within 10 business days following the conclusion of the meet and confer conference, if the Claim or any portion of the Claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the Claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within 60 Days after the City issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The public entity and Contractor shall mutually agree to a mediator within 10 business days after the disputed 861
A2-122
portion of the Claim has been identified in writing, unless the parties agree to select a mediator at a later time.
15.8.2 If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
15.8.3 For purposes of this Article, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this Article.
15.8.4 Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
15.8.5 Unless otherwise agreed by the parties, the mediation shall be held after completion of the Work or the date the Contractor last performs Work, whichever occurs first. All unresolved Claims shall be considered jointly in a single mediation, unless a new unrelated Claim arises after mediation is completed.
15.9 Procedures After Mediation. If following the mediation, the Claim or any portion remains in dispute, the Contractor must file a Claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation. For purposes of those provisions, the running of the period of time within which a Claim must be filed shall be tolled from the time the Contractor submits its written Claim pursuant to subdivision (a) until the time the Claim is denied, including any period of time utilized by the meet and confer conference.
15.10 Civil Actions.
15.10.1 The following procedures are established for all civil actions filed to resolve Claims of $375,000 or less:
15.10.2 Within 60 Days, but no earlier than 30 Days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of this Contract. The mediation process shall provide for the selection within 15 Days by both 862
A2-123
parties of a disinterested third person as mediator, shall be commenced within 30 Days of the submittal, and shall be concluded within 15 Days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.
15.10.3 If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.
15.11 Government Code Claim Procedures.
15.11.1 This Article does not apply to tort claims and nothing in this Article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.5 of Title 1 of the Government Code.
15.11.2 In addition to any and all requirements of the Contract Documents pertaining to notices of and requests for adjustment to the Contract Time, Contract Price, or compensation or payment for Additional Work, disputed Work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City.
15.11.3 Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to adjustment of the Contract Time or Contract Price for Additional Work, disputed Work, construction claims, and/or changed conditions have been followed by Contractor. If Contractor does not comply with the Government Code claim procedure or the prerequisite contractual requirements, Contractor may not file any action against the City.
15.11.4 A Government Code claim must be filed no earlier than the date the Work is completed or the date the Contractor last performs Work on the Project, whichever occurs first. A Government Code claim shall be inclusive 863
A2-124
of all unresolved Claims known to Contractor or that should reasonably be known to Contractor excepting only new unrelated Claims that arise after the Government Code claim is submitted.
15.12 Non-Waiver. The City’s failure to respond to a Claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the Claim being deemed rejected in its entirety, and shall not constitute a waiver of any rights under this Article.
15.13 Litigation. Any claims, disputes, or controversies between the parties arising out of or related to the Contract, which have not been resolved in accordance with the procedures set forth herein shall be resolved in a court of competent jurisdiction.
15.14 Duty to Continue Performance. Unless provided to the contrary in the Contract Documents, Contractor shall continue to perform the Work and City shall continue to satisfy its payment obligations to Contractor, pending the final resolution of any dispute or disagreement between Contractor and City.
16. MISCELLANEOUS PROVISIONS
16.1 Limitations On City’s Responsibilities. City shall not supervise, direct, or have control or authority over, nor be responsible for, the Contractor’s means, methods, techniques, sequences, or procedures of design or construction, or the safety precautions and programs incident thereto, or for any failure of the Contractor to comply with Applicable Laws applicable to the performance of the Work. City will not be responsible for the Contractor’s failure to perform the Project in accordance with the Contract Documents.
16.2 Successors. This Contract shall be binding upon and shall inure to the benefit of the parties and their respective successors and permitted assigns. The Contractor may not either voluntarily or by action of law, assign any obligation assumed by the Contractor hereunder without the prior written consent of the City.
16.3 Cumulative Remedies. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Applicable Laws, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Article will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply.
16.4 Survival of Obligations. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract 864
A2-125
Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Project or termination or completion of the Contract or termination of the services of the Contractor.
16.5 Controlling Law. Notwithstanding any subcontract or other contract with any Subcontractor, Supplier, or other person or organization performing any part of the Project, this Contract shall be governed by the law of the State of California without regard to conflict of law principles.
16.6 Jurisdiction; Venue. The Contractor and any Subcontractor, supplier, or other person or organization performing any part of the Project agree that any action or suits at law or in equity arising out of or related to the proposal process, award, or performance of the Project shall be maintained in the Superior Court of Riverside County, California, and expressly consent to the jurisdiction of said court, regardless of residence or domicile, and agree that said court shall be a proper venue for any such action.
16.7 Headings. Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions.
16.8 City’s Right to Audit.
16.8.1 Contractor shall maintain records relevant to performance of the Project, payments requested or received, Change Order Requests, and Claims, including applicable contracts, subcontracts, invoices, payroll records, equipment records, and supporting cost documentation. Records shall be retained for at least three (3) years after final payment, or longer if required by applicable law. Records relevant to an unresolved Claim, audit, or litigation shall be retained until that matter is finally resolved.
16.8.2 City and its authorized representatives shall have an independent right to examine, audit, and obtain copies of records reasonably relevant to verifying performance, payments, quantities, reimbursable costs, mark-ups, Change Order Requests, and Claims under this Contract, subject to Section
16.8.3. This right shall not depend upon an examination or audit by the California State Auditor. Access shall be provided upon reasonable written notice during normal business hours, without unreasonable interference with Contractor’s operations. Contractor shall require Subcontractors to retain and provide access to relevant records on the same terms.
16.8.3 For Contractor-manufactured signs and sign components priced at mutually agreed fixed unit prices or lump-sum amounts under Section
10.12.1, City’s contractual audit rights shall not require disclosure of Contractor’s internal fabrication costs, manufacturing methods, or internal profit margins. Contractor shall nevertheless provide records sufficient to 865
A2-126
verify agreed prices, quantities, specifications, included work, delivery, and performance. This exception shall not apply to separately priced installation or other site work, Subcontractor charges, or amounts for which Contractor seeks reimbursement based on actual costs, including amounts claimed in connection with termination. Exercise of City’s audit rights shall not convert agreed fixed prices into cost-reimbursable amounts.
16.8.4 In accordance with Government Code Section 8546.7, the contracting parties shall be subject to examination and audit by the California State Auditor for a period of three (3) years after final payment under the Contract.
Contractor shall provide records and cooperation required for such examination and audit. Nothing in this Section, Section 10.12.1, or any other provision of the Contract shall limit records access or audit authority required by applicable law.
16.9 Assignment.
16.9.1 Contractor shall not assign, transfer, convey, sublet, or otherwise dispose of this Contract or any part thereof including any claims, without prior written consent of City. Any assignment without the written consent of City shall be void. Any assignment of money due or to become due under this Contract shall be subject to a prior lien for services rendered or Material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such Materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.
16.9.2 As set forth in Public Contract Code section 7103.5, in entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment by the parties.
16.10 All Legal Provisions Included.
16.10.1 Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified by their terms. References to specific laws, rules or regulations in this Contract are for reference purposes only, and shall not limit or affect the applicability of provisions not specifically mentioned. If 866
A2-127
Contractor observes that drawings and specifications are at variance therewith, the Contractor shall promptly notify City in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in Work. If Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to City, he shall bear all costs arising therefrom.
16.10.2 Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA laws, rules and regulations. Contractor shall comply with the Historic Building Code, including, but not limited to, as it relates to the ADA, whenever applicable.
16.10.3 Contractor acknowledges and understands that, pursuant to Public Contract Code section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code section 2717(b) in order to supply mined material for this Contract.
16.10.4 No City official or representative who is authorized in such capacity and on behalf of City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the Work, shall be or become directly or indirectly interested financially in the Contract.
16.10.5 All provisions of law required to be inserted in the Contract or Contract Documents pursuant to any Applicable Laws shall be and are inserted herein. If through mistake, neglect, oversight, or otherwise, any such provision is not herein inserted or inserted in improper form, upon the application of either party, the Contract or Contract Documents shall be changed by City, at no increase in the Contract Price or Contract Time, so as to strictly comply with the Applicable Laws and without prejudice to the rights of either party hereunder.
16.11 State License Board Notice. Contractors are required by law to be licensed and regulated by the Contractor’s State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, the Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826. 867
A2-128
16.12 Noise.
16.12.1 The Contractor shall use only such equipment on the Project and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by CAL-OSHA.
16.12.2 The Contractor shall comply with the most restrictive of the following:
(1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not return that equipment to the Project site until the device is repaired or replaced. Noise and vibration level requirements shall apply to all equipment on the jobsite or related to the Project, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.
16.13 Change In Name Or Nature of Contractor’s Legal Entity. Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify City in order that proper steps may be taken to have the change reflected in the Contract Documents and all related documents. No change of the Contractor’s name or nature will affect City’s rights under the Contract Documents, including but not limited to the bonds and insurance.
16.14 Complete Contract. The Contract Documents constitute the full and complete understanding of the parties and supersede any previous agreements or understandings, oral or written, with respect to the subject matter hereof. The Contract may be modified only by a written instrument signed by both parties or as otherwise provided in the Contract Documents.
16.15 Notice of Third Party Claims. Pursuant to Public Contract Code section 9201, City shall provide Contractor with timely notification of the receipt of any third-party claim relating to the Contract.
16.16 Severability of Provisions. If any one or more of the provisions contained in the Contract Documents should be invalid, illegal, or unenforceable in any respect, the validity, legality, and enforceability of the remaining provisions contained herein shall not in any way be affected or impaired thereby.
16.17 Correction of Errors and Omissions.
16.17.1 The Contractor shall be responsible for the accuracy and completeness of the Construction Documents prepared as part of the Work 868
A2-129
and shall correct any errors, omissions, or inconsistencies in the Construction Documents at no additional cost to the City.
16.18 Interpretation of Contract Documents. The Contract Documents shall not be construed in favor of or against any party, but shall be construed as if all parties participated equally in their preparation.
END OF GENERAL CONDITIONS
869
A3-130
ATTACHMENT 3
SPECIAL CONDITIONS
MODIFICATIONS TO THE GENERAL CONDITIONS
Reserved.
870
A6-131
ATTACHMENT 4
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the City of Palm Desert (hereinafter referred to as “City”) has awarded to Best Signs, Inc., (hereinafter referred to as the “Contractor”) an agreement for Entry Monument Signage Project (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated November 12, 2026, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, Best Signs, Inc., the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of Eight Hundred Seventy Four Thousand Eight Hundred Forty Dollars, ($874,840), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its elected or appointed officers, and their respective agents, officials, employees, volunteers and representatives, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the 871
A6-132
Contractor or Surety’s obligations under the Contract, law, or equity, including, but not limited to, California Code of Civil Procedure section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code. 872
A6-133
[SIGNATURES ON NEXT PAGE]
873
A6-134
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20____.
(Corporate Seal) Contractor/ Principal
By _________________ ____
Printed name: ____________________
Title: ___________________________
(Corporate Seal) Surety By:_____________________________ Printed Name: ____________________
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate)
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)
(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety and
Agent or Representative for
service of process in California)
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto
874
A6-135
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared ___________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
875
A6-136
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared _____________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
876
A6-137
PAYMENT BOND
KNOW ALL PERSONS BY THESE PRESENTS That
WHEREAS, the City of Palm Desert (hereinafter designated as the “City”), by action taken or a resolution passed November 12, 2026, has awarded to Best Signs, Inc., hereinafter designated as the “Principal,” a contract for the work described as follows:
Entry Monument Signage Project (the “Project”).; and
WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated November 12, 2026, (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of Eight Hundred Seventy Four Thousand Eight Hundred Forty Dollars, ($874,840) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Section 9100 877
A6-138
of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.
It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code.
[SIGNATURES ON FOLLOWING PAGE]
878
A6-139
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By:__________________ ____
Printed name: ____________________
Title: ___________________________
(Corporate Seal) Surety
By:_____________________________
Printed Name: ____________________
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate)
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.
879
A6-140
NOTE: This acknowledgment is to be completed for Contractor/Principal.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On _________________, 20___, before me, _______________________________, Notary Public, personally appeared _______________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
880
A6-141
NOTE: This acknowledgment is to be completed for the Attorney-in-Fact. The Power-of-Attorney to local representatives of the bonding company must also be attached.
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On _________________, 20___, before me, _______________________________, Notary Public, personally appeared _______________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
881
A6-142
ATTACHMENT 6
HOURLY RATE SCHEDULE FOR EXTRA WORK
Reserved.
882
A7-143
ATTACHMENT 7
WORKERS’ COMPENSATION CERTIFICATION
Labor Code section 3700 in relevant part provides:
Every employer except the State shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this state. b. By securing from the Director of Industrial Relations a certificate of consent to self-insure, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his employees.
I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work of this Contract.
Date:
Name of Contractor:
Signature:
Print Name:
Title:
(In accordance with Article 5 - commencing at section 1860, chapter 1, part 7, division 2 of the Labor Code, the above certificate must be signed and filed with the awarding body prior to performing any Work under this Contract.)
883
884
885
886