Cities Index.
Agenda packet

Palm Springs City Council
March 9, 2023

Document
Agenda packet
Meeting
March 9, 2023
Body
Palm Springs City Council
Pages
28
Original file
97.7 MB
Text extracted from the city's file for reading and search. Open the original on palmsprings.primegov.com. That file is the official record.

Catherine Howe, MS – Ganddini Group, Inc.

Noise
Roma Stromberg, INCE, MS – Ganddini Group, Inc.

Catherine Howe, MS – Ganddini Group, Inc.

Cultural Resources
Bai “Tom” Tang, Principal Investigator – CRM Tech
Michael Hogan, Principal Investigator – CRM Tech

Hydrology & WQMP
Rodney Reed, PE – MSA Consulting, Inc.

Traffic
John Kain, AICP – Urban Crossroads, Inc.

Marlie Whiteman, PE – Urban Crossroads, Inc.

Item 2B - Page 215

Final
RIOS Project
Initial Study/Mitigated Negative Declaration
Appendices

Appendices A though G are available for viewing on the City of Palm Springs website at https://www.palmspringsca.gov/government/departments/planning/ceqa-documents.

Item 2B - Page 216

ATTACHMENT M
Item 2B - Page 217
1 Heather Boland
From: Noriko Kikuchi <[email protected]> Sent: Wednesday, October 26, 2022 2:04 PM
To: Anna Choudhuri; Heather Boland
Cc: Edward Robertson
Subject: FW: SCH Number 2022100079
Just FYI…

From: Alexandra Owens <[email protected]>
Sent: Wednesday, October 26, 2022 2:00 PM
To: Noriko Kikuchi <[email protected]>
Subject: SCH Number 2022100079

NOTICE: This message originated outside of The City of Palm Springs -- DO NOT CLICK on links or open a�achments unless you are sure the content is safe.

Hello,
This email is no�fying you that the State Clearinghouse has received comments from a State Agency (CDFW) regarding your IS/MND for RIOS - 575 North Palm Canyon Drive. Normally, the State Clearinghouse staff does not no�fy lead agencies when they have received comments. We are doing so now only because your ISMND is not undergoing state review. You may find the CDFW comment le�er in the a�achments sec�on of the project’s page on either the CEQA Submit or CEQAnet profile.

To view your submission, use the following link.
h�ps://ceqasubmit.opr.ca.gov/Document/Index/282144/1
Thank you,
Alexandra Owens
CEQA Technician
Governor’s Office of Planning and Research
State Clearinghouse
[email protected]
(916)445-0613

1-1
Item 2B - Page 218
1 Heather Boland
From: Noriko Kikuchi <[email protected]> Sent: Thursday, October 20, 2022 8:41 AM
To: Anna Choudhuri; Heather Boland
Cc: Edward Robertson
Subject: FW: Requesting Attachments - RIOS North Palm Canyon Drive Project Importance: High
GoodmorningAnnaandHeather,

PleasefindtheeͲmailfromtheDepartmentofFishandWildlifebelow. Couldyoupleasetellmewherethedocumentsarelocated? 
Thankyou.

Noriko

NorikoKikuchi,AICP
AssociatePlanner
DepartmentofPlanningServices
CityofPalmSprings
3200E.TahquitzCanyonWay
PalmSprings,CA92262
Phone:(760)323Ͳ8245

Coronavirus(COVIDͲ19):
ForthelatestupdatesfromtheCityofPalmSprings:www.palmspringsca.gov/covid ExperiencingfluͲlikesymptoms?CoachellaValleyresidentsshouldcontacttheEisenhowerHospitalCoronavirushotline, beforereportingtoahospitalordoctor:(760)837Ͳ8988. 
From:Hockaday,Alyssa@Wildlife<[email protected]> Sent:Thursday,October20,20228:35AM
To:NorikoKikuchi<[email protected]>
Subject:RequestingAttachmentsͲRIOSNorthPalmCanyonDriveProject 
NOTICE:ThismessageoriginatedoutsideofTheCityofPalmSpringsͲͲDONOTCLICKonlinksoropenattachmentsunlessyouare surethecontentissafe.

HiNoriko,

OnbehalfofCDFWastheResponsibleAgencyforthesubmittedMNDpertainingtotheRIOSNorthPalmDriveProject,I amhavingtroublefindingseveralattachmentsintheInitialStudyplanappendices.Specifically,AttachmentDͲ PotentiallyOccurringSpecialͲStatusBiologicalResources,AttachmentEͲCVMSHCPAvoidanceandMinimization Measures,andAttachmentFͲRegulations.

Ifyoucouldemailthoseattachmentstomedirectly(ordirectmetothepagenumberifImistakenlybypassedthose), thatwouldbeverymuchappreciated.

2-1
Item 2B - Page 219
2 Thankyou,

AlyssaHockaday
SeniorEnvironmentalScientist
CaliforniaDepartmentofFishandWildlife
InlandDesertsRegion|HabitatConservationProgram|DesertEastUnit 3602InlandEmpireBlvd,SuiteCͲ220,Ontario,CA91764 Cell:(760)920Ͳ8252

Item 2B - Page 220
State of California – Natural Resources Agency GAVIN NEWSOM, Governor DEPARTMENT OF FISH AND WILDLIFE CHARLTON H. BONHAM, Director Inland Deserts Region
3602 Inland Empire Blvd, Suite C-220
Ontario, CA 91764
www.wildlife.ca.gov

October 25, 2022
Sent via e-mail

Noriko Kikuchi
Associate Planner
City of Palm Springs
3200 East Tahquitz Canyon Way
Palm Springs, CA 92262

RIOS PROJECT (PROJECT)

DRAFT INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION (IS/MND) SCH# 2022100079

Dear Ms. Kikuchi:

The California Department of Fish and Wildlife (CDFW) received a Notice of Intent to Adopt an IS/MND from the City of Palm Springs for the Project pursuant to the California Environmental Quality Act (CEQA) and CEQA Guidelines.
1 Thank you for the opportunity to provide comments and recommendations regarding those activities involved in the Project that may affect California fish and wildlife. Likewise, we appreciate the opportunity to provide comments regarding those aspects of the Project that CDFW, by law, may be required to carry out or approve through the exercise of its own regulatory authority under the Fish and Game Code.

CDFW ROLE

CDFW is California’s Trustee Agency for fish and wildlife resources and holds those resources in trust by statute for all the people of the State. (Fish & G. Code, §§ 711.7, subd. (a) & 1802; Pub. Resources Code, § 21070; CEQA Guidelines § 15386, subd. (a).) CDFW, in its trustee capacity, has jurisdiction over the conservation, protection, and management of fish, wildlife, native plants, and habitat necessary for biologically sustainable populations of those species. (Id., § 1802.) Similarly, for purposes of CEQA, CDFW is charged by law to provide, as available, biological expertise during public agency environmental review efforts, focusing specifically on projects and related activities that have the potential to adversely affect fish and wildlife resources.

CDFW is also submitting comments as a Responsible Agency under CEQA. (Pub.

Resources Code, § 21069; CEQA Guidelines, § 15381.) CDFW expects that it may need to exercise regulatory authority as provided by the Fish and Game Code. As proposed, for example, the Project may be subject to CDFW’s lake and streambed alteration regulatory authority (Fish & G. Code, § 1600 et seq.) Likewise, to the extent implementation of the Project as proposed may result in “take” as defined by State law of any species protected under the California Endangered Species Act (CESA) (Fish & G. Code, § 2050 et seq.), the project proponent may seek related take authorization as provided by the Fish and Game Code.

PROJECT DESCRIPTION SUMMARY

Proponent: City of Palm Springs

Objective: The objective of the Project is to implement a zoning change for the Project site from Central Business District (CBD) and Limited Multiple-Family Residential (R-2) to Retail Business (C-1). The discretionary approval by the City of the Change of Zone, Tentative Tract Map, Major Architectural Review, and a Variance would allow construction of a new mixed-use development that includes 24 residential condominiums and 2,214 square feet of commercial space. This development would be situated on 2.4-acres of

1 CEQA is codified in the California Public Resources Code in section 21000 et seq. The “CEQA Guidelines” are found in Title 14 of the California Code of Regulations, commencing with section 15000. 3-1
3-2
3-3
Item 2B - Page 221
Noriko Kikuchi, Associate Planner
City of Palm Springs
October 25, 2022

Page 2 ends

undeveloped parcels. Construction is expected to occur in five phases, including site preparation, grading, building construction, paving, and architectural coating.

Location: The Project is located in the City of Palm Springs on four parcels (Assessor’s Parcel Numbers 505-322-001 through 505-322-004) at the northwest corner of North Palm Canyon Drive and West Chino Drive (575 North Palm Canyon Drive), Riverside County, California. It is within the north-central portion of the City, approximately 2.5 miles west of the Palm Springs International Airport. Lands surrounding the parcels are developed residential units and commercial businesses. The Project’s parcels are located within the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSCP) boundary. The Project is within the Indio subbasin of the Coachella Valley Groundwater Basin.

Timeframe: Construction is anticipated to start in November 2022 and to be completed by May 2024 (18 months total).

COMMENTS AND RECOMMENDATIONS

CDFW has jurisdiction over the conservation, protection, and management of fish, wildlife, native plants, and habitat necessary for biologically sustainable populations of those species (i.e., biological resources). CDFW offers the comments and recommendations below to assist the City of Palm Springs in adequately identifying and/or mitigating the Project’s significant, or potentially significant, direct and indirect impacts on fish and wildlife (biological) resources. Editorial comments or other suggestions may also be included to improve the document. The IS/MND has not adequately identified and disclosed the Project’s impacts (i.e., direct, indirect, and cumulative) to biological resources and whether those impacts are less than significant. CDFW offers the following comments and recommendations to assist the City in adequately identifying and mitigating the Project’s significant, or potentially significant, impacts to biological resources.

CDFW’s comments and recommendations on the IS/MND are explained in greater detail below and summarized here. The IS/MND bases its analysis of impacts to biological resources on a report by ELMT Consulting, which conducted a habitat assessment of the Project site on February 25, 2022 (Appendix B of the IS/MND). CDFW is concerned about the potential for special-status species, including those not covered under the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP), to occur on the Project site. The habitat assessment was not conducted at the appropriate time(s) of year to detect all special-status species on-site. Surveys conducted at the appropriate times of the year and using standard survey protocols are needed to inform appropriate avoidance, minimization, and mitigation measures, as well as to determine whether impacts to biological resources have been mitigated to a level that is less than significant.

Furthermore, the mitigation measure provided in the IS/MND is not adequate to protect nesting birds.

Assessment of Impacts to Biological Resources

Nesting Birds

It is the Project proponent’s responsibility to comply with all applicable laws related to nesting birds and birds of prey. Fish and Game Code sections 3503, 3503.5, and 3513 afford protective measures as follows: section 3503 states that it is unlawful to take, possess, or needlessly destroy the nest or eggs of any bird, except as otherwise provided by Fish and Game Code or any regulation made pursuant thereto. Fish and Game Code section 3503.5 makes it unlawful to take, possess, or destroy any birds in the orders Falconiformes or Strigiformes (birds-of-prey) or to take, possess, or destroy the nest or eggs of any such bird except as otherwise provided by Fish and Game Code or any regulation adopted pursuant thereto. Fish and Game Code section 3513 makes it unlawful to take or possess any migratory nongame bird except as provided by rules and regulations adopted by the Secretary of the Interior under provisions of the Migratory Bird Treaty Act of 1918, as amended (16 U.S.C. § 703 et seq.).

The IS/MND (p. 37) indicates that “the Project site and surrounding area provides suitable 3-5
3-4
3-3
Item 2B - Page 222
Noriko Kikuchi, Associate Planner
City of Palm Springs
October 25, 2022

Page 3 ends

foraging and nesting habitat for avian species [year-round, seasonal, and migrating songbirds] adapted to human disturbance and desert environments.” CDFW is concerned about impacts to nesting birds from ground-disturbing activities and construction. Although the IS/MND includes Mitigation Measure (MM) BIO-1 for nesting birds, the timing and scope are insufficient to protect nesting birds. CDFW recommends the revised IS/MND include specific avoidance and minimization measures to ensure that impacts to nesting birds do not occur. Project-specific avoidance and minimization measures may include, but are not limited to, Project phasing and timing, monitoring of Project-related noise (where applicable), sound walls, and buffers, where appropriate. CDFW recommends that disturbance of occupied nests of migratory birds and raptors within the Project site be avoided any time birds are nesting onsite. Preconstruction nesting bird surveys shall be performed within 3 days prior to Project activities to determine the presence and location of nesting birds. CDFW recommends MM BIO-1 be revised as follows:

MM BIO-1: Avoidance of Nesting Birds

Nesting bird surveys shall be performed by a qualified avian biologist no more than (3) days prior to vegetation removal or ground-disturbing activities.

Pre-construction surveys shall focus on both direct and indirect evidence of nesting, including nest locations and nesting behavior. The qualified avian biologist will make every effort to avoid potential nest predation as a result of survey and monitoring efforts. If active nests are found during the pre- construction nesting bird surveys, a qualified biologist shall establish an appropriate nest buffer to be marked on the ground. Nest buffers are species specific and shall be at least 300 feet for passerines and 500 feet for raptors.

A smaller or larger buffer may be determined by the qualified biologist familiar with the nesting phenology of the nesting species and based on nest and buffer monitoring results. Established buffers shall remain on site until a qualified biologist determines the young have fledged or the nest is no longer active. Active nests and adequacy of the established buffer distance shall be monitored daily by the qualified biologist until the qualified biologist has determined the young have fledged or the Project has been completed. The qualified biologist has the authority to stop work if nesting pairs exhibit signs of disturbance.

Pursuant to the CEQA Guidelines, section 15097(f), CDFW has prepared a draft mitigation monitoring and reporting program (MMRP) for proposed MM BIO-1–7 (see Attachment 1).

Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP) Within the Inland Deserts Region, CDFW issued Natural Community Conservation Plan Approval and Take Authorization for the CVMSHCP per Section 2800, et seq., of the California Fish and Game Code on September 9, 2008. The CVMSHCP establishes a multiple species conservation program to minimize and mitigate habitat loss and provides for the incidental take of covered species in association with activities covered under the permit. Compliance with approved habitat plans, such as the CVMSHCP, is discussed in CEQA. Specifically, Section 15125(d) of the CEQA Guidelines requires that the CEQA document discuss any inconsistencies between a proposed Project and applicable general plans and regional plans, including habitat conservation plans and natural community conservation plans. An assessment of the impacts to the CVMSHCP as a result of this Project is necessary to address CEQA requirements. To obtain additional information regarding the CVMSHCP please go to: http://www.cvmshcp.org/.

The Project occurs within the CVMSHCP area and is subject to provisions and policies of the CVMSHCP. The Project does not occur within or share a common boundary with a Conservation Area of the CVMSHCP; however, Santa Rosa and San Jacinto Mountains Conservation Area is approximately 0.26 miles west of the Project, and Whitewater Floodplain Conservation Area is approximately 3.0 miles north of the Project. To be considered a covered activity, Permittees should demonstrate that proposed actions are consistent with the CVMSHCP and its associated Implementing Agreement. The City of Palm Springs is the Lead Agency and a Permittee of the CVMSHCP . The IS/MND includes
3-5
3-6
Item 2B - Page 223
Noriko Kikuchi, Associate Planner
City of Palm Springs
October 25, 2022

Page 4 ends

mitigation measure BIO-2 to address the Project occurring within the CVMSHCP. CDFW recommends MM BIO-2 be revised as follows:

MM BIO-2: CVMSHCP Compliance
Prior to construction and issuance of any grading permit, the City of Palm Springs shall ensure compliance with the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP) and its associated Implementing Agreement and shall ensure the collection of payment of the CVMSHCP Local Development Mitigation Fee.

Special-Status Plants

Based on review of the California Natural Diversity Database (CNDDB) and Biogeographic Information and Observation System (BIOS), plant species that are state and/or federally listed as endangered and plant species with California Rare Plant Ranks of 1B and 2B have the potential to occur in the Project area. The California Rare Plant Rank 1B indicates plants that are rare, threatened, or endangered in California and elsewhere, and California Rare Plant Rank 2B indicates plants that are rare, threatened, or endangered in California but more common elsewhere. Impacts to these species must be analyzed during preparation of environmental documents relating to CEQA because they meet the definition of rare or endangered under CEQA Guidelines §15125 (c) and/or §15380.

The IS/MND indicates that no special-status plants were observed during the habitat assessment conducted on February 25, 2022. The biological report indicates that 32 special-status plant species were identified in literature and database searches for the Palm Springs quadrangle, including species not covered by the CVMSHCP. CDFW is concerned that the habitat assessment was not conducted at the appropriate time of year to detect all special-status plants on the Project site. CNDDB/BIOS indicates that the following special-status plants have historically occurred near the Project location: Mecca- aster (Xylorhiza cognata), pygmy lotus (Acmispon haydonii), Latimer’s woodland-gilia (Saltugilia latimeri), Parry’s spineflower (Chorizanthe parryi var. parryi), Parish’s brittlescale (Atriplex parishii), slender cottonheads (Nemacaulis denudata var. gracilis), Payson’s jewelflower (Caulanthus simulans), and Horn’s milk-vetch (Astragalus hornii var. hornii). CDFW recommends that a thorough, recent, floristic-based assessment of special- status plants is completed at the appropriate time(s) of year before the City of Palm Springs adopts the MND. The results of this assessment should be included in a revised MND. If any rare, threatened, endangered, or other sensitive plant species are located within the Project site, CDFW recommends that the IS/MND be revised to include appropriate avoidance minimization, and mitigation measures. CDFW recommends adding the following mitigation measure:

MM BIO-3: Special-Status Plants

A thorough floristic-based assessment of special-status plants and natural communities, following CDFW's Protocols for Surveying and Evaluating Impacts to Special Status Native Plant Populations and Natural Communities (CDFW 2018 or most recent version) shall be performed by a qualified biologist prior to commencing Project activities. Should any state-listed plant species be present in the Project area, the Project proponent shall obtain an Incidental Take Permit for those species not covered under the CVMSHCP prior to the start of Project activities.

Burrowing Owl (Athene cunicularia)

Burrowing owl is a California Species of Special Concern. Take of individual burrowing owls and their nests is defined by Fish and Game Code section 86, and prohibited by sections 3503, 3503.5, and 3513. Fish and Game Code section 3513 makes it unlawful to take or possess any migratory nongame bird except as provided by rules and regulations adopted by the Secretary of the Interior under provisions of the Migratory Bird Treaty Act of 1918, as amended (16 U.S.C. § 703 et seq.). Burrowing owl is a Covered Species under 3-8
3-7
3-6
Item 2B - Page 224
Noriko Kikuchi, Associate Planner
City of Palm Springs
October 25, 2022

Page 5 ends

the CVMSHCP, which requires that avoidance and minimization measures be implemented for this species.

Attachment D of the biological report indicates that burrowing owl is presumed absent from the Project site. However, because of the potential for burrowing owl to move into disturbed sites, CDFW recommends that prior to commencing Project activities, pre- construction surveys for burrowing owl be conducted by a qualified biologist. CDFW recommends adding the following mitigation measure to the revised IS/MND:

MM BIO-4: Burrowing Owl Surveys

Pre-construction burrowing owl surveys shall be conducted no less than 14 days prior to the start of Project-related activities and within 24 hours prior to ground disturbance, in accordance with the Staff Report on Burrowing Owl Mitigation (CDFG 2012 or most recent version). Pre-construction surveys should be performed by a qualified biologist following the recommendations and guidelines provided in the Staff Report on Burrowing Owl Mitigation. If the pre-construction surveys confirm occupied burrowing owl habitat, Project activities shall be immediately halted. The qualified biologist shall coordinate with CDFW and USFWS to conduct an impact assessment to develop avoidance and minimization measures to be approved by CDFW prior to commencing Project activities.

Desert Tortoise (Gopherus agassizii)

According to the IS/MND, no desert tortoises were detected during the habitat assessment conducted on February 25, 2022. Chapter 4 of the Desert Tortoise (Mojave Population) Field Manual indicates that “surveys should be conducted during the desert tortoise’s most active periods (April through May or September through October)” (USFWS 2009, p. 4–8).

CDFW is concerned that the timing and scope of the survey were insufficient to determine the presence of desert tortoise on the Project site.

Although desert tortoise is covered under the CVMSHCP, Section 9.6.1.4 of the plan indicates: “Both inside and outside Conservation Areas, avoidance, minimization, and mitigation measures require relocation of individual tortoises if required surveys locate individuals on the site of Covered Activities. For more information about avoidance, minimization, and mitigation measures see Section 4.4.
” CDFW recommends that prior to
commencing Project activities, preconstruction surveys for desert tortoise following the Desert Tortoise (Mojave Population) Field Manual should be conducted by a qualified biologist. As a result, CDFW recommends adding the following mitigation measure:

MM BIO-5: Desert Tortoise Surveys

No more than 14 calendar days prior to start of Project activities, a qualified biologist shall conduct pre-construction surveys for desert tortoise as described in the USFWS Desert Tortoise (Mojave Population) Field Manual (USFWS 2009 or most recent version). Pre-construction surveys shall be completed using perpendicular survey routes within the Project area and 50- foot buffer zone. Pre-construction surveys cannot be combined with other surveys conducted for other species while using the same personnel. Project activities cannot start until two negative results from consecutive surveys using perpendicular survey routes for desert tortoise are documented. Should desert tortoise presence be confirmed during the survey, the qualified biologist shall immediately notify CDFW and USFWS to determine appropriate avoidance, minimization, and mitigation measures.

Desert Kit Fox (Vulpes macrotis arsipus)

Desert kit fox is protected as a fur-bearing mammal under Title 14 of the California Code of Regulations (Chap. 5, § 460) and may not be taken at any time. BIOS data layers showing 8 3-8
3-9
3-10
Item 2B - Page 225
Noriko Kikuchi, Associate Planner
City of Palm Springs
October 25, 2022

Page 6 ends

connectivity modeling for the California Desert Linkage Network indicate that the Project site falls within core breeding habitat for kit fox. Because desert kit fox has high fidelity to natal dens, it is crucial to adequately assess whether desert kit fox is present on the Project site well in advance of commencing Project activities. If desert kit fox is found onsite during breeding season, it could delay Project activities for the length of the breeding season.

The IS/MND (p. 36) indicates that the “Project site provides suitable foraging and denning habitat for mammalian species adapted to human disturbance and desert environments.

However, most mammal species are nocturnal and are difficult to observe during a diurnal field visit.” CDFW is concerned that the timing and scope of the habitat assessment were not sufficient to assess whether desert kit fox is present on the Project site. Therefore, CDFW recommends that prior to commencing Project activities, pre-construction surveys for desert kit fox be conducted by a qualified biologist. As a result, CDFW recommends adding the following mitigation measure:

MM BIO-6: Desert Kit Fox Surveys

No more than 14 days prior to the beginning of ground disturbance and/or Project activities, a qualified biologist shall conduct pre-construction surveys to determine if potential desert kit fox burrows/dens are present in the Project area. Pre-construction surveys should include 100-percent visual coverage of the Project area and cannot be combined with other surveys conducted for other species while using the same personnel. If the pre-construction surveys confirm occupied desert kit fox habitat, Project activities shall be immediately halted, and the qualified biologist shall notify CDFW and USFWS to develop avoidance, minimization, and mitigation measures. No disturbance of active dens shall take place when juvenile desert kit fox may be present and dependent on parental care.

Minimizing Impacts to Other Species

The IS/MND (p. 36) states the Project site has “limited foraging and cover habitat for support reptilian species… suitable foraging and denning habitat for mammalian species,” but includes no avoidance and minimization measures. CDFW recommends inclusion of the following mitigation measure:

MM BIO-7: Minimizing Impacts to Other Species

A qualified biologist shall be on-site prior to and during all ground- and habitat disturbing activities to move out of harm’s way wildlife that would otherwise be injured or killed from Project-related activities. Movement of wildlife out of harm’s way should be limited to only those individuals that would otherwise by injured or killed, and individuals should be moved only as far a necessary to ensure their safety. Measures shall be taken to prevent wildlife from re-entering the Project site. Only biologists with authorization by CDFW shall move CESA-listed species.

ENVIRONMENTAL DATA

CEQA requires that information developed in environmental impact reports and negative declarations be incorporated into a database which may be used to make subsequent or supplemental environmental determinations. (Pub. Resources Code, § 21003, subd. (e).) Accordingly, please report any special-status species and natural communities detected during Project surveys to the California Natural Diversity Database (CNDDB). The CNNDB field survey form can be filled out and submitted online at the following link:
https://wildlife.ca.gov/Data/CNDDB/Submitting-Data. The types of information reported to CNDDB can be found at the following link: https://www.wildlife.ca.gov/Data/CNDDB/Plants- and-Animals.

3-10
3-11
3-12
Item 2B - Page 226
Noriko Kikuchi, Associate Planner
City of Palm Springs
October 25, 2022

Page 7 ends

ENVIRONMENTAL DOCUMENT FILING FEES

The Project, as proposed, would have an impact on fish and/or wildlife, and assessment of environmental document filing fees is necessary. Fees are payable upon filing of the Notice of Determination by the Lead Agency and serve to help defray the cost of environmental review by CDFW. Payment of the environmental document filing fee is required in order for the underlying project approval to be operative, vested, and final. (Cal.

Code Regs, tit. 14, § 753.5; Fish & G. Code, § 711.4; Pub. Resources Code, § 21089.)

CONCLUSION

CDFW appreciates the opportunity to comment on the IS/MND to assist the City of Palm Springs in identifying and mitigating Project impacts on biological resources. CDFW concludes that the IS/MND does not adequately identify or mitigate for the Project’s significant, or potentially significant, impacts on biological resources. CDFW recommends that prior to adoption of the IS/MND, the City of Palm Springs revise the document to include a more complete assessment of the Project’s potential impacts on biological resources, as well as appropriate avoidance, minimization, and mitigation measures.

CDFW personnel are available for consultation regarding biological resources and strategies to minimize impacts.

Questions regarding this letter or further coordination should be directed to Alyssa Hockaday, Senior Environmental Scientist (Specialist), at (760) 920-8252 or [email protected].

Sincerely,

Kim Freeburn
Environmental Program Manager
Inland Deserts Region

Attachment 1: MMRP for CDW-Proposed Mitigation Measures

cc: Heather Brashear, Senior Environmental Scientist (Supervisor), CDFW [email protected]

Office of Planning and Research, State Clearinghouse, Sacramento [email protected]

ATTACHMENT 1: MITIGATION MONITORING AND REPORTING PROGRAM (MMRP)

Biological Resources (BIO)
Mitigation Measure (MM) Description Implementation
Schedule
Responsible
Party
MM-BIO-1: Avoidance of Nesting Birds
Nesting bird surveys shall be performed by a qualified
avian biologist no more than (3) days prior to
vegetation removal or ground-disturbing activities.

Pre-construction surveys shall focus on both direct
and indirect evidence of nesting, including nest
No more than
three (3) days prior
to vegetation
clearing or ground
disturbance
activities.

City of Palm
Springs
3-13
3-14
3-15
Item 2B - Page 227
Noriko Kikuchi, Associate Planner
City of Palm Springs
October 25, 2022

Page 8 ends

locations and nesting behavior. The qualified avian
biologist will make every effort to avoid potential nest predation as a result of survey and monitoring efforts.

If active nests are found during the pre-construction
nesting bird surveys, a qualified biologist shall
establish an appropriate nest buffer to be marked on
the ground. Nest buffers are species specific and
shall be at least 300 feet for passerines and 500 feet
for raptors. A smaller or larger buffer may be
determined by the qualified biologist familiar with the nesting phenology of the nesting species and based
on nest and buffer monitoring results. Established
buffers shall remain on site until a qualified biologist determines the young have fledged or the nest is no
longer active. Active nests and adequacy of the
established buffer distance shall be monitored daily
by the qualified biologist until the qualified biologist has determined the young have fledged or the Project
has been completed. The qualified biologist has the
authority to stop work if nesting pairs exhibit signs of disturbance.

MM-BIO-2: CVMSHCP Compliance
Prior to construction and issuance of any grading
permit, the City of Palm Springs shall ensure
compliance with the Coachella Valley Multiple
Species Habitat Conservation Plan (CVMSHCP) and
its associated Implementing Agreement and shall
ensure the collection of payment of the CVMSHCP
Local Development Mitigation Fee.

Prior to
construction and
issuance of any
grading permit.

City of Palm
Springs
MM-BIO-3: Special-status Plants
A thorough floristic-based assessment of special-
status plants and natural communities, following
CDFW's Protocols for Surveying and Evaluating
Impacts to Special Status Native Plant Populations
and Natural Communities (CDFW 2018 or most
recent version) shall be performed by a qualified
biologist prior to commencing Project activities.

Should any state-listed plant species not covered
under the CVMSHCP be present in the Project area,
the Project proponent shall obtain an Incidental Take
Permit for those species prior to the start of Project
activities.

Prior to
commencing
Project activities.

City of Palm
Springs
MM-BIO-4: Burrowing Owl Surveys

Pre-construction burrowing owl surveys shall be
conducted no less than 14 days prior to the start of
Project-related activities and within 24 hours prior to ground disturbance, in accordance with the Staff
Report on Burrowing Owl Mitigation (CDFG 2012 or
most recent version). Pre-construction surveys should
be performed by a qualified biologist following the
recommendations and guidelines provided in the Staff
Report on Burrowing Owl Mitigation. If the pre-
construction surveys confirm occupied burrowing owl
habitat, Project activities shall be immediately halted.

The qualified biologist shall coordinate with CDFW
and USFWS to conduct an impact assessment to
develop avoidance and minimization measures to be
Pre-construction
surveys: No less
than 14 days prior
to start of Project-
related activities
and within 24
hours prior to
ground
disturbance.

City of Palm
Springs
3-15
Item 2B - Page 228
Noriko Kikuchi, Associate Planner
City of Palm Springs
October 25, 2022

Page 9 ends

approved by CDFW prior to commencing Project
activities.

MM-BIO-5: Desert Tortoise Surveys
No more than 14 calendar days prior to start of
Project activities, a qualified biologist shall conduct pre-construction surveys for desert tortoise as
described in the USFWS Desert Tortoise (Mojave
Population) Field Manual (USFWS 2009 or most
recent version). Pre-construction surveys shall be
completed using perpendicular survey routes within
the Project area and 50-foot buffer zone. Pre-
construction surveys cannot be combined with other
surveys conducted for other species while using the
same personnel. Project activities cannot start until
two negative results from consecutive surveys using
perpendicular survey routes for desert tortoise are
documented. Should desert tortoise presence be
confirmed during the survey, the qualified biologist
shall immediately notify CDFW and USFWS to
determine appropriate avoidance, minimization, and
mitigation measures.

Pre-construction
surveys: No more
than 14 days prior
to start of Project-
related activities.

City of Palm
Springs
MM-BIO-6: Desert Kit Fox Surveys
No more than 14 days prior to the beginning of
ground disturbance and/or Project activities, a
qualified biologist shall conduct pre-construction
surveys to determine if potential desert kit fox
burrows/dens are present in the Project area. Pre-
construction surveys should include 100-percent
visual coverage of the Project area and cannot be
combined with other surveys conducted for other
species while using the same personnel. If the pre-
construction surveys confirm occupied desert kit fox
habitat, Project activities shall be immediately halted, and the qualified biologist shall notify CDFW and
USFWS to develop avoidance, minimization, and
mitigation measures. No disturbance of active dens
shall take place when juvenile desert kit fox may be
present and dependent on parental care.

Pre-construction
surveys: No more
than 14 days prior
to start of Project-
related activities.

City of Palm
Springs
MM-BIO-7: Minimizing Impacts to Other Species
A qualified biologist shall be on-site prior to and
during all ground- and habitat disturbing activities to move out of harm’s way wildlife that would otherwise
be injured or killed from Project-related activities.

Movement of wildlife out of harm’s way should be
limited to only those individuals that would otherwise
by injured or killed, and individuals should be moved
only as far a necessary to ensure their safety.

Measures shall be taken to prevent wildlife from re-
entering the Project site. Only biologists with
authorization by CDFW shall move CESA-listed
species.

Prior to and during
Project activities.

City of Palm
Springs

3-15
Item 2B - Page 229
Dear Noriko Kikuchi,
The Agua Caliente Band of Cahuilla Indians (ACBCI) appreciates your efforts to include the Tribal Historic Preservation Office (THPO) in the RIOS project. The project area is not located within the boundaries of the ACBCI Reservation. However, it is within the Tribe’s Traditional Use Area. For this reason, the ACBCI THPO requests the following:
[VIA EMAIL TO:[email protected]]
City of Palm Springs
Noriko Kikuchi
Post Office Box 2743
Palm Springs, CA 92263
October 12, 2022
Re: RIOS
Again, the Agua Caliente appreciates your interest in our cultural heritage. If you have questions or require additional information, please call me at (760) 883-1134. You may also email me at [email protected].

Cordially,
Nicole Raslich
Archaeological Technician
Tribal Historic Preservation Office

AGUA CALIENTE BAND

OF CAHUILLA INDIANS
03-004-2022-008
*The Mitigated Negative Declaration document included standard mitigation measures to address impacts to cultural resources. We found these measures to be sufficient.
*Before ground disturbing activities begin please contact the Tribal Historic Preservation Office at [email protected] to arrange cultural monitoring.
*At this time the concerns of the ACBCI THPO have been addressed and proper mitigation measures have been proposed to ensure the protection of tribal cultural resources. This letter shall conclude our AB52 consultation efforts. 4-1
4-2
4-3
Item 2B - Page 230
1 Heather Boland
From: Vega, Jaqueline <[email protected]>
Sent: Tuesday, October 11, 2022 9:28 AM
To: Noriko Kikuchi
Subject: 575 N Palm Canyon Drive
NOTICE: This message originated outside of The City of Palm Springs -- DO NOT CLICK on links or open a�achments unless you are sure the content is safe.

Hello Noriko,

Thank you for transmi�ng the above referenced project to ALUC for review. Please note that the proposed project is located outside the Airport Influence Area. Therefore, review by ALUC is not required.

Should you have any ques�ons, please contact me.

i¢⁄‹“ƒ?uƒ¤¢?
t·£¢fl?qƒ¤“–fl¢›?o›¢flflƒ·?h?

Con�identiality Disclaimer
This email is con�idential and intended solely for the use of the individual(s) to whom it is addressed. The information contained in this message may be privileged and con�idential and protected from disclosure.

If you are not the author's intended recipient, be advised that you have received this email in error and that any use, dissemination, forwarding, printing, or copying of this email is strictly prohibited. If you have received this email in error please delete all copies, both electronic and printed, and contact the author immediately.

County of Riverside California
5-1
Item 2B - Page 231

ATTACHMENT N
Item 2B - Page 232

Response to Comment Letters
575 N Palm Canyon RIOS

Lead Agency:

City of Palm Springs
3200 E Tahquitz Way
Palm Springs, CA 92262

Prepared by:

The Altum Group
Anna Choudhuri
Heather Boland
44-60 Village Court, Suite 100
Palm Desert, CA 92260

October 2022

Item 2B - Page 233

RESPONSE TO COMMENTS

While the City of Palm Springs is not required to respond to comments on an IS/MND, Sections 21091(d) (1) and 21092.5 of the Public Resources Code (PRC) and Section 150874 (b) of the California Environmental Quality Act (CEQA) Guidelines require that prior to project approval a Lead Agency must consider all comments received before making a final determination on the Initial Study/Mitigated Negative Declaration (IS/MND).

Also, the Lead Agency must notify in writing, any public agency that submitted comments on the IS/MND, of any public hearing on the proposed project for which the IS/MND has been prepared (PRC 21092.5 and CEQA Guidelines 15073(e).

All letters commenting on the Draft IS/MND f or the proposed project have been reproduced and are included in this section. All agencies from whom an individual letter was received during the public review period are listed below, along with our responses to comments received by each agency. All revisions to the Draft IS/MND have been made in response to the comments received during public review in strike-out/underline.

The City of Palm Springs prepared a Draft IS/MND for the 575 N Palm Canyon RIOS Project and circulated the Draft IS/MND for a 20-day public review period pursuant to the requirements of Chapter 3, Section 15105, of the California Environmental Quality Act (CEQA) Guidelines. The review period gave agencies, organizations, and members of the public the opportunity to review the Draft IS/MND and provide comments on the document and the environmental analysis presented therein. The 20 -day review period commenced on October 5, 2022, and ended on October 25, 2022. The Notice of Intent to Adopt for the proposed project was posted at City of Palm Springs City Hall located at 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262 and the City Library, located at 300 South Sunrise Way, Palm Spr ings, CA 92262, for the duration of the public review period. During the review period, the City received one formal letter and three emails from different agencies commenting on the Draft IS/MND. These comments have been attached to this document.

Date
Received Agency Comment Response
October
26th, 2022
State
Clearinghouse
(SCH)
1-1 Comment is noted. No further action is required in response to this comment
October
20th, 2022
California
Department of
Fish and
Wildlife
(CDFW)
2-1
Comment noted. Documents have been provided to
CDFW and were sent by the City to CDFW on October
20th, 2022. No further action is required in response to this comment.

October
25th,
2022
California
Department of
Fish and
Wildlife
(CDFW)
3-1 Comment noted. No further action is required in
response to this comment
3-2 Comment noted. No further action is required in
response to this comment
3-3 Comment noted. No further action is required in
response to this comment
Item 2B - Page 234

RESPONSE TO COMMENTS

3-4
Comment noted. Though the habitat assessment was
conducted in February of 2022, outside of the blooming
season for most of the special -status plants in the area, due to the level of disturbance the project site is subject to from events taking place onsite (i.e., pop up farmers markets, trailer shows, etc.) the project site does not have the potential to support special -
status plants. Further,
any potential seed base for special-status plants has been removed from decades of land uses and surrounding
development. The surrounding development and land
uses onsite have also precluded special- status species from occurring onsite due to continually anthropogenic
disturbances. As a result, the survey that was conducted was able to capture the site’s ability to support or not support suitable habitat for special -
status species. No
further surveys are needed or recommended, and no
further action is required in response to this comment.

3-5
Comment noted. MM BIO-1 has been revised as follows:

If unavoidable project construction activities must begin during the nesting bird season (February 1st through
August 31st), a pre-construction nesting bird survey shall be conducted no more than 14 days prior to initiation of ground disturbance and vegetation removal activities.

The nesting pre -construction bird survey shall be
conducted by a biologist familiar with identification of avian species known to occur in Riverside County. The
nesting bird survey shall be conducted on foot inside the project boundary, including a 300 -foot buffer for
passerines (song birds) and 500-foot buffer for raptors in areas of suitable habitat. Inaccessible areas will be
surveyed using binoculars to the extent practical. If nests are found, an avoidance buffer (dependent upon species, the proposed work activity, the existing disturbances
associated with land use s outside of the site) shall be determined and demarcated by the biologist with bright
orange construction fencing, flagging, construction lathe, or other means to mark the boundary. If a raptor nest is observed in a tree proposed for removal, the applican t must consult with CDFW. All construction personnel be
notified of the existence of the buffer zone and to avoid entering the buffer zone during nesting season. No
ground disturbing activities shall occur within this buffer Item 2B - Page 235

RESPONSE TO COMMENTS

area until the avian biologist has confirmed the
breeding/nesting is completed and the young have
fledged. Encroachment into the buffer shall occur only at the discretion of the qualified biologist.

Nesting bird surveys shall be performed by a qualified
avian biologist no more than (3) days prior to vegetation removal or ground-disturbing activities. Pre-construction surveys shall focus on both direct and indirect evidence of nesting, including nest locations and nesting behavior.

The qualified avian biologist will make every effort to avoid potential nest predation as a result of survey and monitoring efforts. If active nests are found during the preconstruction nesting bird surveys, a qualified biologist shall establish an appropriate nest buffer to be marked on the ground. Nest buffers are species specific and shall be at least 300 feet for passerines and 500 feet for raptors. A smaller or larger buffer may be determined by the
qualified biologist familiar with the nesting phenology of the nesting species and based on nest and buffer
monitoring results. Established buffers shall remain on site until a qualified biologist determines the young have fledged or the nest is no longer active. Active nests and adequacy of the established buffer distance shall be
monitored daily by the qualified biologist until the
qualified biologist has determined the young have fledged or the Project has been completed. The qualified biologist has the authority to stop work if nesting pairs exhibit signs of disturbance.

3-6
Comment noted. MM BIO-2 has been revised as follows:

The applicant shall pay the CVMSHCP Local Development
Mitigation Fee prior to building permit issuance.

Prior to construction and issuance of any grading permit, the City of Palm Springs shall ensure compliance with the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP) and its associated Implementing
Agreement and shall ensure the collection of payment of the CVMSHCP Local Development Mitigation Fee.

3-7
Comment noted. As noted in comment response 3-4, the
project site is heavily disturbed, surrounded by existing development and is subject to routine anthropogenic
disturbances associated with events occurring onsite.

Item 2B - Page 236

RESPONSE TO COMMENTS

Due to these disturbances and surrounding
development, the project site does not have the
potential to support a seed base for special-status plants or support suitable habitat for any of the special-status species known to occur in the area. The special-status
plant species listed in this comment primarily occur in undisturbed native desert scrub habitats, which do not
occur onsite. Suggested Mitigation Measure BIO-3 does
not need to be conducted to determine
presence/absence of special-status species onsite and
will not be included in the MMRP. No further action is
required in response to this comment.
3-8
Comment noted. The City of Palm Springs has found
that, although the Biological Assessment performed by
ELMT is sufficient for the proposed project, CDFW’s
recommended mitigation measure should be included in
the document. The following will be included as MM
BIO-3:

Pre-c
onstruction burrowing owl surveys shall be
conducted no less than 14 days prior to the start of
Project-related activities and within 24 hours prior to ground disturbance, in accordance with the Staff Report on Burrowing Owl Mitigation (CDFG 2012 or most recent
version). Pre construction surveys should be performed
by a qualified biologist following the recommendations
and guidelines provided in the Staff Report on Burrowing Owl Mitigation. If the pre-construction surveys confirm occupied burrowing owl habitat, Project activities shall be immediately halted. The qualified biologist shall
coordinate with CDFW and USFWS to conduct an impact
assessment to develop avoidance and minimization
measures to be approved by CDFW prior to commencing
Project activities.
3-9
Comment noted. Desert tortoise clearance surveys do
not need to be conducted due to the site’s isolation from occupied habitat, onsite disturbance, and surrounding
development. Suggested Mitigation Measure BIO-5 does
not need to be included in the MMRP. No further action
is required in response to this comment.
3-10
Comment noted. Desert kit fox clearance surveys do not
need to be conducted due to the site’s isolation from
occupied habitat, onsite disturbance, and surrounding
development. Suggested Mitigation Measure BIO-6 does
Item 2B - Page 237

RESPONSE TO COMMENTS

not need to be included in the MMRP. No further action
is required in response to this comment.

3-11
Comment noted. Due to the site’s isolation from occupied habitat, onsite disturbance, and surrounding
development special -status reptilian species are not
expected to occur onsite. Suggested Mitigation Measure
Bio-7 does not need to be included in the MMRP. No
further action is required in response to this comment.

3-12 Comment noted. The City of Palm Springs will include this as a condition of approval.
3-13 Comment noted. The City of Palm Springs will include this as a condition of approval.
3-14
Comment noted. The City of Palm Springs has found the
Biological Assessment to be sufficient. In order to
mitigate any potential impacts on biological resources, we have included recommended mitigation measures
that are applicable to the project site offered by CDFW.

No further action is required in response to this
comment.
3-15
Comment noted. The City of Palm Springs will adopt the
Mitigation Monitoring and Reporting Program, as
revised, as a Condition of Approval.

October
12th,
2022
Agua Caliente
Band of
Cahuilla
Indians, Tribal
Historic
Preservation
Office
4-1 Comment noted. No further action is required in
response to this comment
4-2 Comment noted. The City of Palm Springs will include this as a Condition of Approval.
4-3 Comment noted. No further action is required in
response to this comment
October
11th,
2022
Riverside
County
Airport Land
Use
Commission
5-1 Comment noted. No further action is required in
response to this comment
Item 2B - Page 238

This page intentionally left blank.

Item 2B - Page 239

ATTACHMENT O
Item 2B - Page 240
1 MITIGATION MONITORING AND REPORTING PROGRAM (MMRP)
Mitigation Measure (MM) Description Implementation
Schedule
Responsible
Party

BIOLOGICAL RESOURCES
1 BIO-1. Nesting bird surveys shall be performed by a
qualified avian biologist no more than (3) days prior to vegetation removal or ground-disturbing activities. Pre- construction surveys shall focus on both direct and
indirect evidence of nesting, including nest locations
and nesting behavior. The qualified avian biologist will make every effort to avoid potential nest predation as a result of survey and monitoring efforts. If active nests are found during the preconstruction nesting bird
surveys, a qualified biologist shall establish an
appropriate nest buffer to be marked on the ground.

Nest buffers are species specific and shall be at least 300 feet for passerines and 500 feet for raptors. A
smaller or larger buffer may be determined by the
qualified biologist familiar with the nesting phenology of the nesting species and based on nest and buffer
monitoring results. Established buffers shall remain on site until a qualified biologist determines the young
have fledged or the nest is no longer active. Active
nests and adequacy of the established buffer distance
shall be monitored daily by the qualified biologist until the qualified biologist has determined the young have
fledged or the Project has been completed. The
qualified biologist has the authority to stop work if
nesting pairs exhibit signs of disturbance.

No more than 3
days prior to
vegetation
clearing or
ground
disturbance
activities.

City of Palm
Springs –
Planning
Department
2 BIO-2. Prior to construction and issuance of any grading permit, the City of Palm Springs shall ensure compliance with the Coachella Valley Multiple Species Habitat
Conservation Plan (CVMSHCP) and its associated
Implementing Agreement and shall ensure the collection
of payment of the CVMSHCP Local Development
Mitigation Fee.

Prior to
construction and
issuance of any
grading permit.

City of Palm
Springs –
Planning
Department
3 BIO-3. Pre-construction burrowing owl surveys shall
be conducted no less than 14 days prior to the start of Project-related activities and within 24 hours prior to ground disturbance, in accordance with the Staff
Report on Burrowing Owl Mitigation (CDFG 2012 or
most recent version). Pre construction surveys should
be performed by a qualified biologist following the
recommendations and guidelines provided in the Staff
Report on Burrowing Owl Mitigation. If the pre-
construction surveys confirm occupied burrowing owl
habitat, Project activities shall be immediately halted.

The qualified biologist shall coordinate with CDFW and
USFWS to conduct an impact assessment to develop
Pre-construction
surveys: No
less than 14
days prior to
start of Project-
related activities
and within 24
hours prior to
ground
disturbance.

City of Palm
Springs –
Planning
Department
Item 2B - Page 241
2 MITIGATION MONITORING AND REPORTING PROGRAM (MMRP)
Mitigation Measure (MM) Description Implementation
Schedule
Responsible
Party
avoidance and minimization measures to be approved
by CDFW prior to commencing Project activities.

CULTURAL RESOURCES
1 CUL-1. If buried cultural materials are discovered
during the earth-moving operations, all work in that
area shall be halted or diverted until a qualified
archaeologist can evaluate the nature and significance
of the finds and, if necessary, develop a treatment plan in consultation with the City of Palm Springs and the
appropriate Native American tribes.

During grading
activities or
excavations at
project site.

City of Palm
Springs –
Planning
Department
2 CUL-2. In the unexpected event human remains are
uncovered during construction activities, all
construction work taking place within the vicinity of the discovered remains must cease and the necessary
steps to ensure the integrity of the immediate area
must be taken. The County Coroner must be notified
within 24 hours of the discovery of human remains. If
the remains discovered are determined by the coroner
to be of Native American descent, the coroner shall
contact the Native American Heritage Commission
(NAHC) within 24 hours. The NAHC would in turn
contact the Most Likely Descendant (MLD) who would
determine further action to be taken. The MLD would
have 48 hours to access the site and make a
recommendation regarding disposition of the remains.

During grading
activities or
excavations at
project site.

City of Palm
Springs –
Planning
Department

TRIBAL CULTURAL RESOURCES
1 TBL-1. Prior to issuance of a Grading Permit, the
applicant shall obtain written approval to proceed with construction from the Los Coyotes Band of Cahuilla
and Cupeno Indians and Agua Caliente Band of
Cahuilla Indians, Tribal Historic Preservation Officer or Tribal Archaeologist. The applicant shall contact the
Tribal Historic Preservation Officer or the Tribal
Archaeologist at (760) 699-6800, to determine their
requirements, if any, associated with grading or other
construction. The applicant is advised to contact the
Tribal Historic Preservation Officer or Tribal
Archaeologist as early as possible. If required, it is the responsibility of the applicant to coordinate scheduling of Tribal monitors during grading or other construction, and to arrange payment of any required fees
associated with Tribal monitoring. The applicant shall coordinate scheduling of Agua Caliente Tribal cultural
monitors during grading or other construction, and to
arrange payment of any required fees associated with
Tribal monitoring.

By the
applicant.

City of Palm
Springs –
Planning
Department
Item 2B - Page 242
3 MITIGATION MONITORING AND REPORTING PROGRAM (MMRP)
Mitigation Measure (MM) Description Implementation
Schedule
Responsible
Party
2 TBL-2. Prior to the commencement of ground
disturbing activities, the applicant shall contact the
Tribal Historic Preservation Office at ACBCI-
[email protected] to arrange cultural
monitoring.

By the
applicant.

City of Palm
Springs –
Planning
Department

Item 2B - Page 243

ATTACHMENT P
Item 2B - Page 244
City of Palm Springs TIA Guidelines
July 2020
34 Project Scoping Form
This scoping form shall be submitted to the City of Palm Spring s to assist in identifying infrastructure improvements that may be required to support traffic from the proposed project.

Project Identification:

Case Number:

Related Cases:

SP No.

EIR No.

GPA No.

CZ No.

Project Name:

Project Address:

Project Opening
Year:

Project
Description:

Consultant: Developer:

Name:

Address:

Telephone:

Fax/Email:

Trip Generation Information:

Trip Generation Data Source:

Current General Plan Land Use: Proposed General Plan Land Use:

Current Zoning: Proposed Zoning:

Palm Canyon Multi-Family
North of W. Chino Dr. and west of Palm Canyon Dr.
24 multifamily residential units & 5,411 square feet retail Urban Crossroads, Inc. - Marlie Whiteman, P.E.
1133 Camelback St. #8329
Newport Beach, CA 92658
(714) 585-0574
[email protected]
ITE Trip Generation Manual, 11th Edition (2021)
RIOS - Brent Lucy
3101 Exposition Place
Los Angeles, CA 90018
(323) 200-2080
[email protected]
Central Business District Multi-Family Residential
CBD (Central Business District) &
R2 (Limited Multiple-Family Residential Zone) R2 (Limited Multiple-Family Residential Zone) Item 2B - Page 245
City of Palm Springs TIA Guidelines
July 2020
35 Existing Trip Generation Proposed Trip Generation
In Out Total In Out Total
AM Trips
PM Trips

Trip Internalization: Yes No ( % Trip Discount)
Pass-By Allowance: Yes No ( % Trip Discount)

Potential Screening Checks
Is your project screened from specific analyses (see Page 11 of the guidelines related to LOS assessment and Pages 24-26).

Is the project screened from LOS assessment? Y e s N o LOS screening justification (see Page 11 of the guidelines):

Is the project screened from VMT assessment? Yes No
VMT screening justification (see Pages 24-26 of the guidelines):

10 12 22
26 23 49
0 0 0
0 0 0
* Project generates less than 100 peak hour trips
* Project is less than 150 multi-family units
* Project is less than 50,000 sf retail
* Project is less than 147 dwelling units.
* Project is located in a high-quality transit area
Item 2B - Page 246
City of Palm Springs TIA Guidelines
July 2020
36 Level of Service Scoping
x Proposed Trip Distribution (Attach Graphic for Detailed Distribution):

North South East West
% % % %
x Attach list of Approved and Pending Projects that need to be considered (provided by the City of Palm Springs and adjacent agencies)
x Attach list of study intersections/roadway segments
x Attach site plan
x Not other specific items to be addressed:
o Site access
o On-site circulation
o Parking
o Consistency with Plans supporting Bikes/Peds/Transit
o O t h e r
x D a t e o f T r a f f i c C o u n t s
x Attach proposed analysis scenarios (years plus proposed forecasting approach) x Attach proposed phasing approach (if the project is phased) VMT Scoping
For projects that are not screened, identify the following:
x T r a v e l D e m a n d F o r e c a s t i n g M o d e l U s e d x Attach Screening VMT Assessment output or describe why it is not appropriate for use x Attach proposed Model Land Use Inputs and Assumed Conversion Factors (attach)

See attached traffic scoping letter, dated January 24, 2023 See attached VMT screening evaluation, dated January 24, 2023 Item 2B - Page 247
City of Palm Springs TIA Guidelines
July 2020
37 Detailed VMT Forecasting Information
Most trip-based models generate daily person trip-ends for each TAZ across various trip purposes (HBW, HBO, and NHB, for example) based on population, household , and employment variables.

This may create challenges for complying with the VMT guidance because trip generation is not directly tied to specific land use categories. The following me thodology addresses this particular challenge among others.

P r o d u c t i o n a n d a t t r a c t i o n t r i p - e n d s a r e s e p a r a t e l y c a l c u l a t e d for each zone, and generally:
production trip-ends are generated by residential land uses and attraction trip-ends are generated by non-residential land uses. OPR's guidance addresses resident ial, office, and retail land uses.

Focusing on residential and office land uses, the first step to forecasting VMT requires translating the land use into model terms, the closest approximations are:
x Residential: home-based production trips
x Office: home-based work attraction trips
Note that this excludes all non- home-based trips including wor k-based other and other-based other trips.

The challenges with computing VMT for these two types of trips in a trip-based model are 1) production and attraction trip-ends are not distinguishable after the PA to OD conversion process and 2) trip purposes are not maintained after the mode choice s tep. For these reasons, it not possible to use the VMT results from the standard vehicle assignment (even using a select zone re- assignment). A separate post-process must be developed to re-es timate VMT for each zone that includes trip-end types and trip purposes.

The procedure for extracting VMT from the model is described below:
x Re-skim final loaded congested networks for each mode and time period x Run a custom PA to OD process that replicates actual model steps, but:
o Keeps departure and return trips separate
o Keeps trip purpose and mode separate
o Converts person trips to vehicle trips based on auto occupancy rates and isolates automobile trips
o Factors vehicle trips into assignment time periods
x Multiply appropriate distance skim matrices by custom OD matrices to estimate VMT x Sum matrices by time period, mode, and trip purpose to calculate daily automobile VMT x Calculate automobile VMT for individual TAZs using marginal totals:
o Residential (home-based) - row of departure matrix plus column of return matrix o Office (home-based work) - column of departure matrix plus row of return matrix Item 2B - Page 248
City of Palm Springs TIA Guidelines
July 2020
38 Appropriateness Checks
Regardless of which method is used, the number of vehicle trips from the custom PA to OD process and the total VMT should match as closely as possible with the results from the traditional model p r o c e s s . T h e e s t i m a t e d r e s u l t s should be checked against the re sults from a full model run to understand the degree of accuracy. Note that depending on how each model is setup, these custom processes may or may not include IX/XI trips, truck trips, or special generator trips (airport, seaport, stadium, etc.).

When calculating VMT for comparison at the study area, citywide, or regional geography, the same methodology that was used to estimate project-specific VMT shou ld be used. The VMT for these comparisons can be easily calculated by aggregating the row or column totals for all zones that are within the desired geography.

Item 2B - Page 249
ATTACHMENT: TRAFFIC SCOPING LETTER
Item 2B - Page 250

13910‐02 ‐ Scope.docx

January 24, 2023

Mr. Peter Mahler
Old Las Palmas Partners, LLC
250 E Wisconsin Ave, Suite 1610
Milwaukee, WI 53202

SUBJECT:  PALM CANYON MULTI‐FAMILY TRAFFIC SCOPING LETTER Dear Mr. Peter Mahler:

The  firm  of  Urban  Crossroads,  Inc.  is  pleased  to  submit  this  Traffic  Scoping  Letter  for  the  proposed Palm  Canyon  Multi‐Family  (“Project”).   It  is  our  understanding  that  the  Project  consists  of  24  multi‐ family residential units and 5,411 square feet of retail located on a vacant lot north of W. Chino Drive and west of Palm Canyon Drive in the City of Palm Spring s.  This  letter describes the draft proposed
project trip generation and trip distribution.

A preliminary site plan for the proposed Project is shown on Exhibit 1.  Exhibit 2 depicts the location of the  proposed  project  in  relation  to  the  existing  roadway  network.  A   fu ll  access  (gated)  entry  to  the Project is provided via Belardo Road.

TRIP GENERATOR DESCRIPTION
Determining trip generation for a specific project is based upon estimates of the amount of traffic that is expected to be both attracted to and produced by the specific on‐site land use.  For this assessment, trip generation rates are based upon data collected by the Institute of Transportation Engineers (ITE) in the Trip Ge
neration Manual, 11th Edition, 2021.

The ITE Land Use (LU) Codes 220 and 822 and land use descriptions has been utilized to identify the appropriate ITE description of the proposed Project:

ITE Land Use Code: 220 – Multifamily Housing (Low‐Rise) Low‐rise  multifamily  housing  includes  apartments,  townhouses,  and  condominiums  located within  the  same  buildin
g  with  at  least  three  other  dwelling  units  and  that  have  one  or  two levels (floors).

ITE Land Use Code: 822 – Local Retail (<40k)
A retail center of less than 40,000 square feet that’s owned and operated by one entity.

Item 2B - Page 251
2 Item 2B - Page 252
TURN
STOP
STOP
STOP

A T T E M P
24 UNIT MULTI-FAMILY
2 STORIES
BUILDING HEIGHT 30'-0" ABOVE GRADE
1ST FLOOR: 38,123 SF
2ND FLOOR: 22,528 SF
COVERED EXTERIOR 14,687 SF
TOTAL: 75,338 SF
FAR: 0.73
DRIVEWAY & 24'-0" FIRE LANE

BELARDO ROAD

PALM CANYON DRIVE

CHINO DRIVE

BUILDING A

SETBACK
5' - 0"

EASEMENT & SETBACK
5' - 0" PEDESTRIAN
1 UNIT OVER RETAIL
2 STORIES2 STORIES2 STORIES

POOL & SPACOURTYARD
1 2
3 4
5 6
7 8
9 11 12
15 SETBACK
5' - 0"
(E) STREET

PARKING
10 TRASH/ RECYLING
ENCLOSURE. SEE A2.01

EXISTING HISTORIC

MONUMENT TO REMAIN

EXISTING STONE

PILLARS TO REMAIN

BUILDING B

BUILDING C
10' - 0"
10' - 0"
10' - 0"
10' - 0"

NO VISUAL

OBSTRUCTIONS
PER 93.02.00(D)

NO VISUAL

OBSTRUCTIONS
PER 93.02.00(D)
13 TYP.
9' - 0"
5' - 0"
TYP.
18' - 0"
9' - 0"
8' - 0"
9' - 0"
TYP.
18' - 0"
CANOPY
480 SF
CANOPY
300 SF
CANOPY
450 SF
(N) CURB. SEE CIVIL

DRAWINGS
(N) CURB. SEE CIVIL

DRAWINGS
PROVIDE 5'

SIDEWALK IN R/W
6' - 5 1/2" PLANTING
5' - 0" SIDEWALK
20' - 0" PER CIVIL

EASEMENT
30' - 0" UTILITY
(N) DRIVEWAY
APPROACH. SEE CIVIL

SETBACK
5' - 0"
451' - 6"
25' - 6"
9' - 0" TO BLDG
14' - 6"
10' - 4"
16 VAN
87' - 4" TO MOTORCOURT GATE

BUILDING D
14 CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
1" = 30'-0"
1/19/2023 9:43:33 AM
1/19/2023 9:43:33 AM
Palm Canyon
Residences

SITE PLAN
A1.01
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS
20155
1" = 30'-0"

SITE PLAN
1 PARKING REQUIRED PER 92.26.00 'D' DOWNTOWN PARKING COMBINED ZONE (5) 1 BEDROOM UNITS x .5 STALLS PER UNIT = 2.5 STALLS
(13) 2 BEDROOM UNITS x 1 STALLS PER UNIT = 13 STALLS
(6) 3 BEDROOM UNITS x 1 STALLS PER UNIT = 6 STALLS
TOTAL RESIDENTIAL STALLS = 26 STALLS
(3) EV READY
RETAIL 1/375 SF (5,411 SF) = 15 = 15 STALLS
(1) EV CHARGING
TOTAL = 41 STALLS REQUIRED
1 ADA ACCESSIBLE
1 VAN ACCESSIBLE
4 EV CHARGING

PARKING PROVIDED
(38) 1 CAR GARAGES = 38 STALLS
TOTAL ASSIGNED RESIDENTIAL STALLS = 38 STALLS
(14) STANDARD GUEST/RETAIL STALLS
(1) STANDARD ACCESSIBLE
(1) VAN ACCESSIBLE = 16 GUEST STALLS
= 56 TOTAL STALLS

EV STALLS
PER 93.06.00(B)(12)(c) 10% OF PROVIDED PARKING SHALL BE WIRED TO SUPPORT FUTURE ELECTIC VEHICLE CHARGING.

FLOOR AREA CALCULATIONS
LOT AREA = 104,437 SF
BUILDING SPACE LEVEL 1 LEVEL 2
A PARKING 2,310 SF
RESIDENTIAL 2,265 SF
COVERED EXTERIOR 705 SF 225 SF
B PARKING 2,414 SF
RESIDENTIAL 3,503 SF 4,091 SF
COVERED EXTERIOR 667 SF 1,235 SF
C RETAIL 1,200 SF
GATEHOUSE 819 SF
RESIDENTIAL 15,774 SF 7,080 SF
COVERED EXTERIOR 3,746 SF 1,743 SF
D PARKING 4,242 SF
AMENITY 1,822 SF
RETAIL 4,211 SF
RESIDENTIAL 1,691 SF 9,092 SF
COVERED EXTERIOR 1,489 SF 2,295 SF
MISC. CANOPIES 2,582 SF
TOTALS ENCLOSED BLDG 37,986 SF 22,528 SF
COVERED EXTERIOR 9,189 SF 5,498 SF
TOTAL: ENCLOSED BLDG 60,514 SF
COVERED 14,687 SF
BUILDABLE AREA 75,201 SF
FAR = 0.73

OPEN SPACE CALCULATION
REQUIRED:

C-1: N/A
DEFINITION PER PSZC 91.00.10:
'OPEN SPACE' MEANS ANY PARCEL OR AREA OF LAND OR WATER WHICH IS SET

ASIDE, DEDICATED, DESIGNATED, OR RESERVED FOR PUBLIC USE OR FOR

PRIVATE USE AND ENJOYMENT OF OWNERS AND OCCUPANTS OF LAND ADJOINING OR NEIGHBORING SUCH OPEN SPACE. OPEN SPACE MAY INCLUDE

NATURAL AREAS, PARKS, TRAILS, SIDEWALKS, LANDSCAPED MEDIANS,

SWIMMING POOLS, RECREATIONAL FACILITIES, WATER FEATURES, DRAINAGE

FACILITIES, AND SIMILAR FEATURES AND AMENITIES, BUT SHALL NOT INCLUDE STREETS, DRIVEWAYS, PARKING LOTS, OR HABITABLE BUILDINGS.

PROVIDED:

COMMON OPEN SPACE: 36,334 SF
PRIVATE OPEN SPACE*: 21,477 SF
TOTAL OPEN SPACE: 54,161 SF
% OF LOT AREA: 52%
*INCLUDES SECOND FLOOR EXTERIOR SPACE AND COVERED SPACE INCLUDED

IN TOTAL FLOOR AREA ABOVE

BUILDING PROGRAM & UNIT COUNT

BUILDING A
LEVEL 1 - (10) ASSIGNED PARKING STALLS 2,310 SF
LEVEL 2 - (2) RESIDENTIAL UNITS 2,265 SF
COVERED EXTERIOR 930 SF
TOTAL 5,506 SF

BUILDING B
LEVEL 1 - (10) ASSIGNED PARKING STALLS 2,414 SF
(2) RESIDENTIAL UNITS 3,503 SF
LEVEL 2 - (2) RESIDENTIAL UNITS 4,091 SF
COVERED EXTERIOR 1,902 SF
TOTAL 11,909 SF

BUILDING C
LEVEL 1 - RETAIL 1,200 SF
GATEHOUSE 819 SF
(8) RESIDENTIAL UNITS 15,774 SF
LEVEL 2 - (3) RESIDENTIAL UNIT 7,080 SF
COVERED EXTERIOR 5,489 SF
TOTAL 30,362 SF

BUILDING D
LEVEL 1 - (18) ASSIGNED PARKING STALLS 4,243 SF
AMENITY 1,822 SF
RETAIL 4,211 SF
(2) RESIDENTIAL UNITS 1,691 SF
LEVEL 2 - (5) RESIDENTIAL UNIT 9,092 SF
COVERED EXTERIOR 3,784 SF
TOTAL 24,843 SF
3 Item 2B - Page 253
Mr. Peter Mahler
Old Las Palmas Partners, LLC
January 24, 2023

13910‐02 ‐ Scope.docx
PROJECT TRIP GENERATION
Trip  generation  represents  the  amount  of  traffic  which  is  both  attracted  to  and  produced  by  a development. Determining traffic generation for a specific project is therefore based upon forecasting the amount of traffic that is expected to be both attracted to and produced by the specific land uses being proposed for a given development.

Trip  generation  rates  used  to  estimate  Project
traffic  are  shown  in  Table  1.  Table  1  also  shows  a summary of the Project’s trip generation.  The  proposed Project is anticipated  to generate a total of approximately  457  trip‐ends  per  day  with  22  vehicles  per  hour  during  the  AM  peak  hour  and  49 vehicles per hour during the PM peak hour.

TABLE 1: PROJECT TRIP GENERATION SUMMARY

Trip Generation Rates1
Land Use
ITE LU
Code Quantity 2
AM Peak Hour PM Peak Hour
Daily In Out Total In Out Total
Multifamily Housing (Low-Rise) 220 24 DU 0.10 0.30 0.40 0.32 0.19 0.51 6.74 Local Retail (<40k) 822 5.411 TSF 1.42 0.94 2.36 3.30 3.29 6.59 54.45

Trip Generation Results
Land Use
ITE LU
Code Quantity 2
AM Peak Hour PM Peak Hour
Daily In Out Total In Out Total
Multifamily Housing (Low-Rise) 220 24 DU 2 7 9 8 5 13 162 Local Retail (<40k) 822 5.411 TSF 8 5 13 18 18 36 295
TOTAL 10 12 22 26 23 49 457

1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, 11th Edition (2021). 2 DU = Dwelling Unites; TSF = Thousand Square Feet Z:\Shared\UcJobs\_13600-14000\_13900\13910\Excel\[13910 - Scope.xlsx]13910-TG

4 Item 2B - Page 254
Mr. Peter Mahler
Old Las Palmas Partners, LLC
January 24, 2023

13910‐02 ‐ Scope.docx
TRIP DISTRIBUTION AND TRIP ASSIGNMENT
The trip distribution pattern is heavily influenced by the geographical location of the site, the location of surrounding  uses,  and  the  proximity  to  the  regional  freeway  system.  Exhibit   3  displays  the  estimated Project traffic distribution pattern.

Based  on  the  identified  Project  traffic  generation  and  estimated  trip  distribution  pattern,  Project  peak hour intersection tur ning movement volumes are shown on Exhibit 4 for morning and evening peak hours, respectively.

GENERAL PLAN CIRCULATION ELEMENT
Exhibit 5 shows the City of Palm Springs Circulation Plan, and Exhibit 6 illustrates the City of Palm Springs Typical Street Cross‐Sections.

Palm Canyon Drive – Palm Canyon Drive is a north‐south oriented roadway located east of the Project and classified as a 4‐lane divided major thoroughfare in the City of Palm Springs Circulation Plan.  Palm Canyon Drive Road currently exists as a 3‐lane roadway, adj acent to the Project site.

Belardo  Road  –  Belardo  Road  is  a  north‐south  oriented  roadway  located  west  of  the  Project  and classified as a 2‐lane local roadway in the City of Palm Springs Circulatio n Plan.

Chino Drive – Chino Drive is an east‐west oriented roadway located south of the Project and classified as a 2‐lane local roadway in the City of Palm Springs Circulation Plan.

TRAFFIC IMPACT ANALYSIS (TIA) CRITERIA
Per the City of Palm Springs Traffic Impact Analysis Guidelines (July 2020), the proposed Project does not generate enough traffic to warrant a formal traffic impact analysis.  One of the exemptions for preparing a traffic impact analysis is if the Project generates less than 100 vehicle trips during the peak hours and less than 150 dwelling units.

SITE ACCESS
A full access entry to the Project is provided via Belardo Road (west of Palm Canyon Drive).  Peak hour turn volumes shown on Exhibit 4 illustrates that the entering and exiting project traffic at the Project driveway is less than 50 vehicles per hour.  Based  on the projected low peak hour turn volumes at the project driv
eway, cross‐street stop control the Project driveway location is appropriate.

5 Item 2B - Page 255
6 Item 2B - Page 256
7 Item 2B - Page 257
8 Item 2B - Page 258
9 Item 2B - Page 259
Mr. Peter Mahler
Old Las Palmas Partners, LLC
January 24, 2023

13910‐02 ‐ Scope.docx
CONCLUSION REGARDING TRAFFIC ANALYSIS
As mentioned previously, the City of Palm Springs Traffic Impact Guidelines indicate that traffic analysis is generally required when a proposed project consist of 150 or more multi‐family units and will add 100 or more peak hour trips to an adjacent intersection.  The project has less than 150 multi‐family units and traffic  contribution  to  the  nearest  intersections  of  Belardo  Road/Chino  Drive  and Palm  Canyon
Drive/Chino  Drive  are  minimal.   Therefore,  a  formal  traffic  impact  analysis  is  not  required  for  the Project site.

If you have any questions, please contact John Kain at (949) 375‐2435 or Marlie Whiteman (714) 585‐ 0574.

Respectfully submitted,
URBAN CROSSROADS, INC.

John Ka
in, AICP                                                                   Marlie Whiteman, PE Principal   Senior Associate

10 Item 2B - Page 260

13910-03 VMT.docx

January 24, 2023
Mr. Peter Mahler
Old Las Palmas Partners, LLC
250 E Wisconsin Ave, Suite 1610
Milwaukee, WI 53202

PALM CANYON MULTI-FAMILY VEHICLE MILES TRAVELED (VMT) SCREENING

EVALUATION
Mr. Peter Mahler,
Urban Crossroads, Inc. is pleased to provide the following Vehicle Miles Traveled (VMT) Screening Evaluation for the Palm Canyon Multi-Family development (Project) located on a vacant lot north of W. Chino Drive and west of Palm Canyon Drive in the City of Palm Springs (See Attachment A).

PROJECT OVERVIEW
It is our understanding that the Project is propos ed to consist of approximately 24 multi-family residential units and 5,411 square feet of retail (See Attachment A).

BACKGROUND
Changes to California Environmen tal Quality Act (CEQA) Guidelin es were adopted in December 2018, which require all lead agencies to adopt VMT as a replacement for automobile delay-based level of service (LOS) as the measure for identifying transportation impacts for land use projects.

T hi s stat ewi d e m and at e we nt i nto e f fe ct Jul y 1 , 2 02 0. T o ai d in thi s tr a nsi t i on, th e Go v er n or ’ s Office of Planning and Research (OPR) released a Technical Advisory on Evaluating Transportation Impacts in CEQA (December of 2018) (Technical Advisory) (1). Based on the Technical Advisory, the City of Palm Springs has developed and adopte d the Traffic Impact Analysis Guidelines (July 2020) ( City Guidelines ) (2). Riverside County has develo ped and adopted the Transportation Analysis Guidelines for Level of Service, Vehicle Miles Traveled (December 2020) ( County Guidelines) (3).

The City VMT Guidelines reference the use of the Riverside County Transportation Analysis Model (RIVTAM / RIVCOM), which is used throughout the Coachella Valley and in all of Riverside County for VMT screening and analysis pu rposes. The City criteria and th resholds for VMT analysis are based upon RIVTAM modeling.

Item 2B - Page 261
Mr. Peter Mahler
Old Las Palmas Partners, LLC
January 24, 2023

Page 2 of 3 ends

13910-03 VMT.docx

VMT SCREENING
Projects that meet certain VMT screening criteria m a y b e p r e s u m e d t o r e s u l t i n a l e s s t h a n significant transportation impact, including the following:
 Project Type Screening
 Projects Near High Quality Transit
 Map-Based Screening
A land use project need only meet one of the above screening criteria to result in a less than significant impact.

PROJECT TYPE SCREENING
Small projects such as retail buildings with area less than or equal to 50,000 square feet and multi-family residential projects less than or equal to 16 dwe lling units based upon City policy and less than or equal to 147 dwelling units base d on County thresholds may be presumed to have a less than significant impact.

The Project is proposing 5,411 square feet of retail which is a lower quantity than the City and County retail criteria. The Project is also pr oposing 24 residential dwelling units which exceeds the City criteria of 16 dwelling units but is well below the County criteria of 147 dwelling units.

The Project Type screening threshold is met for the retail use.

PROJECTS NEAR HIGH QUALITY TRANSIT
Projects located within a Transit Priority Area (TPA) (i.e., within ½ mile of an existing “major transit stop”1 or an existing stop along a “high-quality transit corridor”2) may be presumed to have a less than significant impact absent substantial evidence to the contrary.

Southern California Councils of Governments (SCAG) provides TPA data through their graphical information system (GIS). This data was utilized to locate if the Project site and its proximity to a TPA. Results as shown in Attachment B, identify the Project Site is located in a high-quality transit area.

TPA screening criteria is met.

1 Pub. Resources Code, § 21064.3 (“‘Major transit stop’ means a site containing an existing rail transit station, a ferry terminal served by either a bus or rail transit service, or the intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoo n peak commute periods.”).
2 Pub. Resources Code, § 21155 (“For purposes of this section, a high‐quality transit corridor means a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.”).

Item 2B - Page 262
Mr. Peter Mahler
Old Las Palmas Partners, LLC
January 24, 2023

Page 3 of 3 ends

13910-03 VMT.docx

MAP-BASED SCREENING
As noted in the Technical Advisory , “Residential and office projects that locate in areas with low VMT and that incorporate similar features (density, mix of uses, and transit accessibility) will tend to exhibit similarly low VMT.”
Based on the Daily VMT per Se rvice Population Co mpared to City Average (2012) map (see Attachment C), the Project is not found to be located within a low VMT generating zone.

Map-based screening criteria is not met.

CONCLUSION
Based on our review of applicable VMT screening thresholds, the Project meets the Project Type criteria for the retail use and the Projects Near High Quality Transit criteria for both residential and retail uses. The Project would therefore result in a less than significant VMT impact finding.

No additional VMT analysis is required.

If you have any questions, please contact us at [email protected] for John Kain or [email protected] for Marlie Whiteman.

Respectfully submitted,
URBAN CROSSROADS, INC.

J o h n K a i n , A I C P M a r l i e W h i t e m a n , P . E .

P r i n c i p a l S e n i o r A s s o c i a t e Item 2B - Page 263

REFERENCES

1. Office of Planning and Research. Technical Advisory on Evaluating Transportation Impacts in CEQA. State of California : s.n., December 2018.

2. City of Palm Springs. Traffic Impact Analysis Guidelines. July 2020.

3. County of Riverside. Transportation Analysis Guidelines for Level of Service, Vehicle Miles Traveled.

December 2020.

Item 2B - Page 264

ATTACHMENT A

PRELIMINARY SITE PLAN
Item 2B - Page 265
TURN
STOP
STOP
STOP

A T T E M P
24 UNIT MULTI-FAMILY
2 STORIES
BUILDING HEIGHT 30'-0" ABOVE GRADE
1ST FLOOR: 38,123 SF
2ND FLOOR: 22,528 SF
COVERED EXTERIOR 14,687 SF
TOTAL: 75,338 SF
FAR: 0.73
DRIVEWAY & 24'-0" FIRE LANE

BELARDO ROAD

PALM CANYON DRIVE

CHINO DRIVE

BUILDING A

SETBACK
5' - 0"

EASEMENT & SETBACK
5' - 0" PEDESTRIAN
1 UNIT OVER RETAIL
2 STORIES2 STORIES2 STORIES

POOL & SPACOURTYARD
1 2
3 4
5 6
7 8
9 11 12
15 SETBACK
5' - 0"
(E) STREET

PARKING
10 TRASH/ RECYLING
ENCLOSURE. SEE A2.01

EXISTING HISTORIC

MONUMENT TO REMAIN

EXISTING STONE

PILLARS TO REMAIN

BUILDING B

BUILDING C
10' - 0"
10' - 0"
10' - 0"
10' - 0"

NO VISUAL

OBSTRUCTIONS
PER 93.02.00(D)

NO VISUAL

OBSTRUCTIONS
PER 93.02.00(D)
13 TYP.
9' - 0"
5' - 0"
TYP.
18' - 0"
9' - 0"
8' - 0"
9' - 0"
TYP.
18' - 0"
CANOPY
480 SF
CANOPY
300 SF
CANOPY
450 SF
(N) CURB. SEE CIVIL

DRAWINGS
(N) CURB. SEE CIVIL

DRAWINGS
PROVIDE 5'

SIDEWALK IN R/W
6' - 5 1/2" PLANTING
5' - 0" SIDEWALK
20' - 0" PER CIVIL

EASEMENT
30' - 0" UTILITY
(N) DRIVEWAY
APPROACH. SEE CIVIL

SETBACK
5' - 0"
451' - 6"
25' - 6"
9' - 0" TO BLDG
14' - 6"
10' - 4"
16 VAN
87' - 4" TO MOTORCOURT GATE

BUILDING D
14 CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
1" = 30'-0"
1/19/2023 9:43:33 AM
1/19/2023 9:43:33 AM
Palm Canyon
Residences

SITE PLAN
A1.01
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS
20155
1" = 30'-0"

SITE PLAN
1 PARKING REQUIRED PER 92.26.00 'D' DOWNTOWN PARKING COMBINED ZONE (5) 1 BEDROOM UNITS x .5 STALLS PER UNIT = 2.5 STALLS
(13) 2 BEDROOM UNITS x 1 STALLS PER UNIT = 13 STALLS
(6) 3 BEDROOM UNITS x 1 STALLS PER UNIT = 6 STALLS
TOTAL RESIDENTIAL STALLS = 26 STALLS
(3) EV READY
RETAIL 1/375 SF (5,411 SF) = 15 = 15 STALLS
(1) EV CHARGING
TOTAL = 41 STALLS REQUIRED
1 ADA ACCESSIBLE
1 VAN ACCESSIBLE
4 EV CHARGING

PARKING PROVIDED
(38) 1 CAR GARAGES = 38 STALLS
TOTAL ASSIGNED RESIDENTIAL STALLS = 38 STALLS
(14) STANDARD GUEST/RETAIL STALLS
(1) STANDARD ACCESSIBLE
(1) VAN ACCESSIBLE = 16 GUEST STALLS
= 56 TOTAL STALLS

EV STALLS
PER 93.06.00(B)(12)(c) 10% OF PROVIDED PARKING SHALL BE WIRED TO SUPPORT FUTURE ELECTIC VEHICLE CHARGING.

FLOOR AREA CALCULATIONS
LOT AREA = 104,437 SF
BUILDING SPACE LEVEL 1 LEVEL 2
A PARKING 2,310 SF
RESIDENTIAL 2,265 SF
COVERED EXTERIOR 705 SF 225 SF
B PARKING 2,414 SF
RESIDENTIAL 3,503 SF 4,091 SF
COVERED EXTERIOR 667 SF 1,235 SF
C RETAIL 1,200 SF
GATEHOUSE 819 SF
RESIDENTIAL 15,774 SF 7,080 SF
COVERED EXTERIOR 3,746 SF 1,743 SF
D PARKING 4,242 SF
AMENITY 1,822 SF
RETAIL 4,211 SF
RESIDENTIAL 1,691 SF 9,092 SF
COVERED EXTERIOR 1,489 SF 2,295 SF
MISC. CANOPIES 2,582 SF
TOTALS ENCLOSED BLDG 37,986 SF 22,528 SF
COVERED EXTERIOR 9,189 SF 5,498 SF
TOTAL: ENCLOSED BLDG 60,514 SF
COVERED 14,687 SF
BUILDABLE AREA 75,201 SF
FAR = 0.73

OPEN SPACE CALCULATION
REQUIRED:

C-1: N/A
DEFINITION PER PSZC 91.00.10:
'OPEN SPACE' MEANS ANY PARCEL OR AREA OF LAND OR WATER WHICH IS SET

ASIDE, DEDICATED, DESIGNATED, OR RESERVED FOR PUBLIC USE OR FOR

PRIVATE USE AND ENJOYMENT OF OWNERS AND OCCUPANTS OF LAND ADJOINING OR NEIGHBORING SUCH OPEN SPACE. OPEN SPACE MAY INCLUDE

NATURAL AREAS, PARKS, TRAILS, SIDEWALKS, LANDSCAPED MEDIANS,

SWIMMING POOLS, RECREATIONAL FACILITIES, WATER FEATURES, DRAINAGE

FACILITIES, AND SIMILAR FEATURES AND AMENITIES, BUT SHALL NOT INCLUDE STREETS, DRIVEWAYS, PARKING LOTS, OR HABITABLE BUILDINGS.

PROVIDED:

COMMON OPEN SPACE: 36,334 SF
PRIVATE OPEN SPACE*: 21,477 SF
TOTAL OPEN SPACE: 54,161 SF
% OF LOT AREA: 52%
*INCLUDES SECOND FLOOR EXTERIOR SPACE AND COVERED SPACE INCLUDED

IN TOTAL FLOOR AREA ABOVE

BUILDING PROGRAM & UNIT COUNT

BUILDING A
LEVEL 1 - (10) ASSIGNED PARKING STALLS 2,310 SF
LEVEL 2 - (2) RESIDENTIAL UNITS 2,265 SF
COVERED EXTERIOR 930 SF
TOTAL 5,506 SF

BUILDING B
LEVEL 1 - (10) ASSIGNED PARKING STALLS 2,414 SF
(2) RESIDENTIAL UNITS 3,503 SF
LEVEL 2 - (2) RESIDENTIAL UNITS 4,091 SF
COVERED EXTERIOR 1,902 SF
TOTAL 11,909 SF

BUILDING C
LEVEL 1 - RETAIL 1,200 SF
GATEHOUSE 819 SF
(8) RESIDENTIAL UNITS 15,774 SF
LEVEL 2 - (3) RESIDENTIAL UNIT 7,080 SF
COVERED EXTERIOR 5,489 SF
TOTAL 30,362 SF

BUILDING D
LEVEL 1 - (18) ASSIGNED PARKING STALLS 4,243 SF
AMENITY 1,822 SF
RETAIL 4,211 SF
(2) RESIDENTIAL UNITS 1,691 SF
LEVEL 2 - (5) RESIDENTIAL UNIT 9,092 SF
COVERED EXTERIOR 3,784 SF
TOTAL 24,843 SF
Item 2B - Page 266

13910-03 VMT.docx

ATTACHMENT B

TPA MAP
Item 2B - Page 267

13910-03 VMT.docx

Item 2B - Page 268

13910-03 VMT.docx

ATTACHMENT C
DAILY VMT PER SERVICE POPULATION COMPARED TO CITY AVERAGE (2012)

MAP-BASED SCREENING

Item 2B - Page 269

13910-03 VMT.docx

RED AREAS MORE THAN CITY AVERAGE

Item 2B - Page 270

ATTACHMENT Q
Item 2B - Page 271
CLIENT

OLD LAS PALMAS PARTNERS, LLC
250 East Wisconsin Avenue, Suite 1610
Milwaukee, WI 53202
Contact: Peter Mahler
email: [email protected]

ARCHITECT / LANDSCAPE ARCHITECT
RIOS
3101 W. Exposition Pl
Los Angeles, CA 90018
T: (323) 785-1800
F: (323) 785-1801
Contact:
email:

PROJECT MANAGEMENT
NAME
Address
Address Line 2
T:

Contacts:
e-mail:

GENERAL CONTRACTOR
NAME
Address
Address Line 2
T:

Contacts:
e-mail:

EXPEDITOR
NAME
Address
Address Line 2
T:

Contact:
e-mail:

STRUCTURAL
NAME
Address
Address Line 2
T:

Contacts:
e-mail:

CIVIL ENGINEER

MSA CONSULTING
A34200 Bob Hope Drive
Rancho Mirage, CA 92270
T: (760) 320-9811
F: (760) 323-7893
Contacts: Rodney Reed
e-mail: [email protected]

IRRIGATION CONSULTANT

SWEENEY & ASSOCIATES
38730 Sky Canyon Drive, Suite C
Murrieta, California 92563
T: (951) 461-6830
F: (951) 461-6850
Contacts: Daniel ZumMallen
e-mail [email protected]

GEOTECHNICAL ENGINEER
NAME
Address
Address Line 2
T:

F:

Contacts:
e-mail:

SURVEYOR

MSA CONSULTING
A34200 Bob Hope Drive
Rancho Mirage, CA 92270
T: (760) 320-9811
F: (760) 323-7893
Contacts: Charles Harris
e-mail: [email protected]

LIGHTING CONSULTANT
eSQUARED
2316 Ralston Ln
Redondo Beach, CA 90278
T:(310) 374-5316
F:

Contacts: Erin Erdman
email: [email protected]
TITLE 24 ENERGY CONSULTANT
NAME
Address
Address
T :

F:

Contacts:
email:

CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
1/8" = 1'-0"
1/25/2023 4:13:10 PM
1/25/2023 4:13:10 PM
Palm Canyon
Residences

TITLE SHEET
G0.01
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS
20155

PROJECT DATAPROJECT TEAM SHEET INDEX
THE DEVELOPMENT OF (4) EMPTY LOTS INTO 24 MULTI-FAMILY
CONDOMINIUMS.

PROJECT DESCRIPTION:
575 N PALM CANYON DRIVEADDRESS:

LEGAL INFORMATION
APN:

LOT AREA:

TRACT:

MAP:

BLOCK:

LOT:

GENERAL PLAN:

ZONING:

MAX HEIGHT LIMITS:

BUILDING HEIGHTS:

APPLICABLE CODE:

SETBACKS:

OCCUPANCY:

CONSTRUCTION TYPE:

BUILDABLE FLOOR AREA:

STORIES:

LOT COVERAGE:

DENSITY:

PARKING:

SPRINKLERS:

FLOOR AREA CALCULATION:
505-322-001-6; 505-322-002-7; 505-322-003-8; 505-322-004-9 26,189 SF + 26,215 SF + 26,100 SF + 26,100 SF = 104,604 SF LOT AREA AFTER CORNER R/W REDUCTION = 104,437 SF
XXX

VISTA ACRES
6 1, 2, 3, 4

CENTRAL BUSINESS DISTRICT
C-1
30'-0"
BUILDING 'A' = 24'-0"
BUILDING 'B' = 24'-0"
BUILDING 'C' = 26'-0"
2019 CALIFORNIA BUILDING CODE
2019 CALIFORNIA GREEN BUILDING CODE
2019 CALIFORNIA MECHANICAL CODE
2019 CALIFORNIA ELECTRICAL CODE
2019 CALIFORNIA PLUMBING CODE
2019 CALIFORNIA ENERGY CODE
2019 CALIFORNIA FIRE CODE
ALL w/ PALM SPRINGS AMENDMENTS
5'-0" AT STREET
R-2

TYPE VA
BUILDING 'A' = 5,506 SF
BUILDING 'B' = 11,909 SF
BUILDING 'C' = 30,362 SF
BUILDING 'D' = 24,843 SF
OUTDOOR CANOPIES = 1,193 SF
TOTAL 73,812 SF
2 STORIES
BUILDING FOOTPRINT 42,737 SF 41%
OPEN SPACE: 56,803 SF 54%
TOTAL FAR 0.71
REFER TO SHEET A1.01 SITE PLAN
FULLY SPRINKLERED PER 903.3.1.1

REFER TO SHEET A1.01 SITE PLAN

SHEET LIST - ARCHITECTURE
SHEET
NO. SHEET NAME
ISSUE
1 ISSUE
2 G0.01 TITLE SHEET • •
A1.01 SITE PLAN • •
A2.01 FLOOR PLAN - LEVEL 1 • •
A2.02 FLOOR PLAN - LEVEL 2 • •
A2.03 ROOF PLAN • •
A3.01 EXTERIOR ELEVATIONS • •
A3.02 EXTERIOR ELEVATIONS • •
A3.03 EXTERIOR ELEVATIONS • •
A3.04 EXTERIOR ELEVATIONS • •

NOT FOR CONSTRUCTION
Palm Canyon Residences
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

SHEET LIST - CIVIL
SHEET
NO. SHEET NAME
ISSUE
1 ISSUE
2 C SURVEY • •
C1 PRELIMINARY GRADING EXHIBIT • •
C2 SITE CROSS SECTIONS • •
C3 SITE PHOTOS • •
C4 PRELIMINARY WATER & SEWER EXHIBIT • •

SHEET LIST - LANDSCAPE
SHEET
NO. SHEET NAME
ISSUE
1 ISSUE
2 L0.20 OVERALL SITE PLAN • •
L0.21 ILLUSTRATIVE SITE PLAN - GROUND FLOOR • •
L0.22 ILLUSTRATIVE SITE PLAN - SECOND FLOOR • •
L0.30 ILLUSTRATIVE PLAN - ENLARGEMENT A • •
L0.31 ILLUSTRATIVE PLAN - ENLARGEMENT B • •
L0.32 ILLUSTRATIVE PLAN - ENLARGEMENT C • •
L0.33 ILLUSTRATIVE PLAN - ENLARGEMENT D • •
L6.00 IRRIGATION LEGEND & NOTES •
L6.01 OVERALL IRRIGATION PLAN •
L6.10 IRRIGATION PLAN A •
L6.11 IRRIGATION PLAN B •
L6.12 IRRIGATION PLAN C •
L6.13 IRRIGATION PLAC D •
L6.20 IRRIGATION DETAILS •
L6.21 IRRIGATION DETAILS •
L6.22 IRRIGATION DETAILS •
L7.00 PLANTING NOTES & SCHEDULE • •
L7.01 OVERALL PLANTING PLAN • •
L7.02 PARKING LOT SHADING EXHIBIT • •
L7.10 TREE PLAN A • •
L7.11 TREE PLAN B • •
L7.12 TREE PLAN C • •
L7.13 TREE PLAN D • •
L7.20 PLANTING PLAN A • •
L7.21 PLANTING PLAN B • •
L7.22 PLANTING PLAN C • •
L7.23 PLANTING PLAN D • •
LT2.01 EXTERIOR LIGHTING PLAN • •
Item 2B - Page 272
TURN
STOP
STOP
STOP

A T T E M P
24 UNIT MULTI-FAMILY
2 STORIES
BUILDING HEIGHT 30'-0" ABOVE GRADE
1ST FLOOR: 37,986 SF
2ND FLOOR: 22,528 SF
COVERED EXTERIOR 13,298 SF
TOTAL: 73,812 SF
FAR: 0.71
DRIVEWAY & 24'-0" FIRE LANE W/ TURNAROUND

BELARDO ROAD

PALM CANYON DRIVE

CHINO DRIVE

BUILDING A

SETBACK
5' - 0"

EASEMENT & SETBACK
5' - 0" PEDESTRIAN
1 UNIT OVER RETAIL
2 STORIES2 STORIES2 STORIES

POOL & SPACOURTYARD
1 2
3 4
5 6
7 8
9 11 12
15 ADA

SETBACK
5' - 0"
(E) STREET

PARKING
10 TRASH/ RECYLING
ENCLOSURE. SEE A2.01

EXISTING HISTORIC

MONUMENT TO REMAIN

EXISTING STONE

PILLARS TO REMAIN

BUILDING B

BUILDING C
10' - 0"
10' - 0"
10' - 0"
10' - 0"

NO VISUAL

OBSTRUCTIONS
PER 93.02.00(D)

NO VISUAL

OBSTRUCTIONS
PER 93.02.00(D)
13 TYP.
9' - 0"
5' - 0"
TYP.
18' - 0"
9' - 0"
8' - 0"
9' - 0"
TYP.
18' - 0"
CANOPY
480 SF
CANOPY
300 SF
CANOPY
450 SF
(N) CURB. SEE CIVIL

DRAWINGS
(N) CURB. SEE CIVIL

DRAWINGS
PROVIDE 5'

SIDEWALK IN R/W
6' - 5 1/2" PLANTING
5' - 0" SIDEWALK
20' - 0" PER CIVIL

EASEMENT
30' - 0" UTILITY
(N) DRIVEWAY
APPROACH. SEE CIVIL

SETBACK
5' - 0"
451' - 6"
25' - 6"
9' - 0" TO BLDG
14' - 6"
10' - 4"
16 VAN
87' - 4" TO MOTORCOURT GATE

BUILDING D
14 CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
1" = 30'-0"
1/25/2023 4:12:36 PM
1/25/2023 4:12:36 PM
Palm Canyon
Residences

SITE PLAN
A1.01
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS

01.24.23 ENTITLEMENTS
20155
1" = 30'-0"

SITE PLAN
1 PARKING REQUIRED PER 92.26.00 'D' DOWNTOWN PARKING COMBINED ZONE (5) 1 BEDROOM UNITS x .5 STALLS PER UNIT = 2.5 STALLS
(13) 2 BEDROOM UNITS x 1 STALLS PER UNIT = 13 STALLS
(6) 3 BEDROOM UNITS x 1 STALLS PER UNIT = 6 STALLS
TOTAL RESIDENTIAL STALLS = 26 STALLS
(3) EV READY
RETAIL 1/375 SF (5,411 SF) = 15 = 15 STALLS
(1) EV CHARGING
TOTAL = 41 STALLS REQUIRED
1 ADA ACCESSIBLE
1 VAN ACCESSIBLE
4 EV CHARGING

PARKING PROVIDED
(38) 1 CAR GARAGES = 38 STALLS
TOTAL ASSIGNED RESIDENTIAL STALLS = 38 STALLS
(14) STANDARD GUEST/RETAIL STALLS
(1) STANDARD ACCESSIBLE
(1) VAN ACCESSIBLE = 16 GUEST STALLS
= 54 TOTAL STALLS

EV STALLS
PER 93.06.00(B)(12)(c) 10% OF PROVIDED PARKING SHALL BE WIRED TO SUPPORT FUTURE ELECTIC VEHICLE CHARGING.

FLOOR AREA CALCULATIONS
LOT AREA = 104,437 SF
BUILDING SPACE LEVEL 1 LEVEL 2
A PARKING 2,310 SF
RESIDENTIAL 2,265 SF
COVERED EXTERIOR 705 SF 225 SF
B PARKING 2,414 SF
RESIDENTIAL 3,503 SF 4,091 SF
COVERED EXTERIOR 667 SF 1,235 SF
C RETAIL 1,200 SF
GATEHOUSE 819 SF
RESIDENTIAL 15,774 SF 7,080 SF
COVERED EXTERIOR 3,746 SF 1,743 SF
D PARKING 4,242 SF
RETAIL 4,211 SF
AMENITY 1,822 SF
RESIDENTIAL 1,691 SF 9,092 SF
COVERED EXTERIOR 1,489 SF 2,295 SF
MISC. CANOPIES 1,193 SF
TOTALS ENCLOSED BLDG 37,986 SF 22,528 SF
COVERED EXTERIOR 7,800 SF 5,498 SF
TOTAL: ENCLOSED BLDG 60,514 SF
COVERED 13,298 SF
BUILDABLE AREA 73,812 SF
FAR = 0.71

OPEN SPACE CALCULATION
REQUIRED:

C-1: N/A
DEFINITION PER PSZC 91.00.10:
'OPEN SPACE' MEANS ANY PARCEL OR AREA OF LAND OR WATER WHICH IS SET

ASIDE, DEDICATED, DESIGNATED, OR RESERVED FOR PUBLIC USE OR FOR

PRIVATE USE AND ENJOYMENT OF OWNERS AND OCCUPANTS OF LAND ADJOINING OR NEIGHBORING SUCH OPEN SPACE. OPEN SPACE MAY INCLUDE

NATURAL AREAS, PARKS, TRAILS, SIDEWALKS, LANDSCAPED MEDIANS,

SWIMMING POOLS, RECREATIONAL FACILITIES, WATER FEATURES, DRAINAGE

FACILITIES, AND SIMILAR FEATURES AND AMENITIES, BUT SHALL NOT INCLUDE STREETS, DRIVEWAYS, PARKING LOTS, OR HABITABLE BUILDINGS.

PROVIDED:

COMMON OPEN SPACE: 35,139 SF
PRIVATE OPEN SPACE*: 21,664 SF
TOTAL OPEN SPACE: 56,803 SF
% OF LOT AREA: 54%
*INCLUDES SECOND FLOOR EXTERIOR SPACE AND COVERED SPACE INCLUDED

IN TOTAL FLOOR AREA ABOVE

BUILDING PROGRAM & UNIT COUNT

BUILDING A
LEVEL 1 - (10) ASSIGNED PARKING STALLS 2,310 SF
LEVEL 2 - (2) RESIDENTIAL UNITS 2,265 SF
COVERED EXTERIOR 930 SF
TOTAL 5,506 SF

BUILDING B
LEVEL 1 - (10) ASSIGNED PARKING STALLS 2,414 SF
(2) RESIDENTIAL UNITS 3,503 SF
LEVEL 2 - (2) RESIDENTIAL UNITS 4,091 SF
COVERED EXTERIOR 1,902 SF
TOTAL 11,909 SF

BUILDING C
LEVEL 1 - RETAIL 1,200 SF
GATEHOUSE 819 SF
(8) RESIDENTIAL UNITS 15,774 SF
LEVEL 2 - (3) RESIDENTIAL UNIT 7,080 SF
COVERED EXTERIOR 5,489 SF
TOTAL 30,362 SF

BUILDING D
LEVEL 1 - (18) ASSIGNED PARKING STALLS 4,243 SF
RETAIL 4,211 SF
AMENITY 1,822 SF
(2) RESIDENTIAL UNITS 1,691 SF
LEVEL 2 - (5) RESIDENTIAL UNIT 9,092 SF
COVERED EXTERIOR 3,784 SF
TOTAL 24,843 SF
Item 2B - Page 273

A T T E M P
UPUPUP
UP
UPUP
UP

UPUPUPUP

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84
C
AL
K
IN
G
7 2
X
8 4
C
AL
K
IN
G
7 2
X
8 4
C
AL
K
IN
G
7 2
X
8 4
C
AL
K
IN
G
7 2
X
8 4
C
AL
K
IN
G
7 2
X
8 4

CAL KING
72X84

CAL KING
72X84
C
AL
K
IN
G
7 2
X
8 4
C
AL
K
IN
G
7 2
X
8 4

CAL KING
72X84

CAL KING
72X84
______________________________________
A3.01
3 ______________________________________
A3.02
3 ______________________________________
A3.02
1 ______________________________________
A3.01
1 ______________________________________
A3.03
11 22
44 5
6 8
77 99
1010
1111
1212
A
A
B
B
D
E
F
G
H
I
J
K
L
M
NO
O
P
P
Q
Q
R
R
S
S
450' - 6"
5' - 0" 32' - 6" 36' - 0" 14' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 31' - 2" 2' - 10" 5' - 0" 231' - 10 1/2"
5' - 0" 11' - 8" 37' - 10" 24' - 0" 42' - 10" 42' - 8" 42' - 0" 20' - 10 1/2" 5' - 0" 5' - 0" 32' - 6" 36' - 0" 14' - 0" 72' - 0" 72' - 0" 30' - 0" 72' - 0" 72' - 0" 7' - 0" 30' - 2" 2' - 10" 5' - 0"
450' - 6"
5' - 0" 11' - 8" 37' - 10" 13' - 3 1/2" 53' - 6 1/2" 2' - 0" 40' - 8" 42' - 0" 20' - 10 1/2" 5' - 0" ______________________________________
A3.03
2______________________________________
A3.03
4 ______________________________________
A3.04
______________________________________
A3.04
2 COURTYARD & LAWN.

SEE LANDSCAPE
G1 G2 G3 G4 G8 G10 G11 G12 G14 G16 G18 G20
G23 G25 G27 G29 G31 G34 G36 G38
#101
2 BEDROOM
UNIT 'B2'
#102
2 BEDROOM
UNIT 'B2'
#103
1 BEDROOM

UNIT 'C'
#104
1 BEDROOM

UNIT 'C'
#112
2 BEDROOM
UNIT 'B1'
#111
2 BEDROOM

UNIT 'B'
#110
2 BEDROOM
UNIT 'B1'
#109
2 BEDROOM

UNIT 'B'
#108
2 BEDROOM
UNIT 'B1'
#107
2 BEDROOM

UNIT 'B'
#106
3 BEDROOM

UNIT 'A'
#105
3 BEDROOM
UNIT 'A1'
PAVED DRIVEWAY.

SEE LANDSCAPE
RST RM
LOBBY

CONCIERGE /
GUARD

MAIL PKGS
4,193 SF
RETAIL
POOL & SPA.

SEE LANDSCAPE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
G33
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE

AMENITY
1 CAR
GARAGE
1 CAR
GARAGE

TRELLIS ABOVE
10' - 0"

DRIVEWAY
24' - 0" 8' - 0"

RESIDENT ENTRY
METERS
SERVICE / STO.
1,172 SF
RETAIL
1 CAR
GARAGE
1 CAR
GARAGE
G21
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
33 TRASH/RECYLING ENCLOSURE TO

HAVE STUCCO FINISH & METAL
GATES TO MATCH BUILDINGS9' - 0"
7' - 0"

TOOLSHED
CART STOR.

GOLF CART
STALL
13' - 2"
9' - 0"

MOTORCOURT
13' - 0"
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
1 CAR
GARAGE
G7G6G5 G9 G13 G15 G17 G19
G22 G24 G26 G28 G30 G32 G35 G37
C
CC.9
DOUBLE

HEIGHT SPACE

EMERGENCY

ACCESS GATE

DRIVEWAY SLIDING GATE

RESIDENT GARDEN
ENTRIES, TYP.

CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
1" = 20'-0"
1/25/2023 4:12:38 PM
1/25/2023 4:12:38 PM
Palm Canyon
Residences
FLOOR PLAN - LEVEL 1
A2.01
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS

01.24.23 ENTITLEMENTS
20155
1" = 20'-0"
LEVEL 01
1 Item 2B - Page 274

A T T E M P

DNDNDNDN

DN DN DN DN
DNDNDN
DN

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84

CAL KING
72X84
C
AL
K
IN
G
7 2
X
8 4
C
AL
K
IN
G
7 2
X
8 4
C
AL
K
IN
G
7 2
X
8 4

CAL KING
72X84
______________________________________
A3.01
3 ______________________________________
A3.02
3 ______________________________________
A3.02
1 ______________________________________
A3.01
1 ______________________________________
A3.03
11 22
44 5
6 8
77 99
1010
1111
1212
A
A
B
B
D
E
F
G
H
I
J
K
L
M
NO
O
P
P
Q
Q
R
R
S
S
450' - 6"SETBACK
5' - 0" 32' - 6" 36' - 0" 14' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 31' - 2" 2' - 10" SETBACK
5' - 0"
231' - 10 1/2"

SETBACK
5' - 0" 11' - 8" 37' - 10" 24' - 0" 42' - 10" 42' - 8" 42' - 0" 20' - 10 1/2"

SETBACK
5' - 0"

SETBACK
5' - 0" 32' - 6" 36' - 0" 14' - 0" 72' - 0" 72' - 0" 30' - 0" 72' - 0" 72' - 0" 7' - 0" 30' - 2" 2' - 10"

EASEMENT
5' - 0" PED
450' - 6"
5' - 0" 49' - 6" 13' - 3 5/8" 53' - 6 3/8" 2' - 0" 40' - 8" 42' - 0" 20' - 10 1/2" 5' - 0" ______________________________________
A3.03
2 ______________________________________
A3.04
______________________________________
A3.04
2 #205
2 BEDROOM
UNIT 'B3'
#206
2 BEDROOM
UNIT 'A2'
#207
2 BEDROOM
UNIT 'A2'
#208
2 BEDROOM
UNIT 'B3'
#201
1 BEDROOM
UNIT 'C1'
#202
1 BEDROOM
UNIT 'B6'
#203
1 BEDROOM
UNIT 'B6'
#204
2 BEDROOM
UNIT 'B6'
#209
3 BEDROOM
UNIT 'B4'
#210
3 BEDROOM
UNIT 'B4'
#211
3 BEDROOM
UNIT 'B4'
#212
3 BEDROOM
UNIT 'B5'
33 7' - 0"

OPEN TO
BELOW

OPEN TO
BELOW
C
CC.9

OPEN TO
BELOW
CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
1" = 20'-0"
1/25/2023 4:12:41 PM
1/25/2023 4:12:41 PM
Palm Canyon
Residences
FLOOR PLAN - LEVEL 2
A2.02
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS

01.24.23 ENTITLEMENTS
20155
1" = 20'-0"
LEVEL 02
1 Item 2B - Page 275

A T T E M P
______________________________________
A3.01
3 ______________________________________
A3.02
3 ______________________________________
A3.02
1 ______________________________________
A3.01
1 ______________________________________
A3.03
11 22
44 5
6 8
77 99
1010
1111
1212
A
A
B
B
D
E
F
G
H
I
J
K
L
M
NO
O
P
P
Q
Q
R
R
S
S
______________________________________
A3.03
2______________________________________
A3.03
4 ______________________________________
A3.04
______________________________________
A3.04
2 450' - 6"
5' - 0" 32' - 6" 36' - 0" 14' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 34' - 0" 5' - 0" 231' - 10 1/2"
5' - 0" 49' - 6" 24' - 0" 42' - 10" 42' - 8" 42' - 0" 20' - 10 1/2" 5' - 0" 5' - 0" 32' - 6" 36' - 0" 14' - 0" 72' - 0" 72' - 0" 30' - 0" 72' - 0" 72' - 0" 40' - 0" 5' - 0" 450' - 6"
5' - 0" 49' - 6" 13' - 3 5/8" 53' - 6 3/8" 2' - 0" 40' - 8" 42' - 0" 20' - 10 1/2" 5' - 0" SKYLIGHT, TYP. TRELLIS, TYP.

EL. 24' - 0"
EL. 21' - 6"
EL. 24' - 0" EL. 22' - 0"
EL. 14' - 0"
EL. 11' - 0"
EL. 24' - 0" EL. 21' - 6"EL. 24' - 0" EL. 21' - 6"
EL. 14' - 0"
EL. 11' - 0"
EL. 12' - 0"
EL. 14' - 0"
EL. 11' - 0"
EL. 14' - 6"
EL. 12' - 0"
EL. 14' - 6"
EL. 12' - 0"
EL. 24' - 0"
EL. 24' - 0"
EL. 24' - 0"
EL. 21' - 6"
EL. 24' - 0"
33 EL. 24' - 0" EL. 24' - 0"
EL. 24' - 0"EL. 24' - 0" EL. 24' - 0"
C
CC.9
EL. 26' - 1"
EL. 13' - 7"
EL. 28' - 0"
EL. 30' - 0"
EL. 24' - 0"EL. 24' - 0"EL. 24' - 0"
CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
1" = 20'-0"
1/25/2023 4:12:45 PM
1/25/2023 4:12:45 PM
Palm Canyon
Residences

ROOF PLAN
A2.03
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS

01.24.23 ENTITLEMENTS
20155
1" = 20'-0"

ROOF PLAN
1 Item 2B - Page 276
Item 2B - Page 277
Item 2B - Page 278
LEVEL 01
0"
LEVEL 02
11' - 6"

CLERESTORY ROOF
13' - 6"
TYP. OVERALL HEIGHT
24' - 0"

K M O P Q R S
MATCH LINE SEE /2 A3.03
11' - 6" 12' - 6"
24' - 0"
5' - 0"32' - 6"36' - 0"14' - 0"72' - 0"72' - 0"
2' - 0"
8' - 1"
8' - 0"
12' - 0"
PL 01
PL 02
PL 01

OPEN TO
BEYOND

OPEN TO
BEYOND
301303 304

MAX ALLOWABLE HEIGHT
30' - 0"
ROOF HEIGHT & PALM CANY.
26' - 1"
301
PL 01 MTL 04
306
301
LEVEL 01
0"
LEVEL 01
0"
LEVEL 02
11' - 6"

CLERESTORY ROOF
13' - 6"
TYP. OVERALL HEIGHT
24' - 0"

A B E G I
MATCH LINE SEE /1 A3.03
11' - 6" 12' - 6"
24' - 0"
72' - 0"72' - 0"7' - 0"30' - 2"
2' - 10"
5' - 0"
2' - 0"
PL 01PL 01
PL 02

OPEN TO
BEYOND

OPEN TO
BEYOND
303

MAX ALLOWABLE HEIGHT
30' - 0"
LVL 2 @ PALM CANYON
13' - 7"
13' - 7" 12' - 6"
26' - 1"
ROOF HEIGHT & PALM CANY.
26' - 1"
301
C C.9
RETAIL
301
MTL 04

OPEN TO
BEYOND
306 306
LEVEL 01
0"
LEVEL 02
11' - 6"
TYP. OVERALL HEIGHT
24' - 0"
ABEGI
MATCH LINE SEE /4 A3.03
24' - 0"
12' - 6"11' - 6"
72' - 0" 72' - 0" 7' - 0" 30' - 2" 2' - 10"5' - 0"
2' - 1"
PL 01PL 01PL 01PL 01PL 01PL 01PL 01

OPEN TO
BEYOND

OPEN TO
BEYOND

MAX ALLOWABLE HEIGHT
30' - 0"
LVL 2 @ PALM CANYON
13' - 7"
8' - 1"
PL 02 303
MTL 04MTL 04
ROOF HEIGHT & PALM CANY.
26' - 1"
308301301
CC.9
306
RETAIL
306

OPEN TO
BEYOND
306306
LEVEL 01
0"
LEVEL 02
11' - 6"

CLERESTORY ROOF
13' - 6"
TYP. OVERALL HEIGHT
24' - 0"
KMOP
MATCH LINE SEE /3 A3.03
12' - 6"11' - 6"
24' - 0"
14' - 0" 72' - 0" 72' - 0"
8' - 1"
2' - 0"3' - 6"8' - 0"
PL 01PL 01PL 01
PL 02
PL 01 PL 01 PL 01PL 01PL 01

OPEN TO
BEYOND

OPEN TO
BEYOND
303304
306

MAX ALLOWABLE HEIGHT
30' - 0"
MTL 04MTL 04
ROOF HEIGHT & PALM CANY.
26' - 1"
301 301
CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
3/32" = 1'-0"
1/25/2023 4:13:03 PM
1/25/2023 4:13:03 PM
Palm Canyon
Residences

EXTERIOR ELEVATIONS
A3.03
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS

01.24.23 ENTITLEMENTS
20155
3/32" = 1'-0"
NORTH ELEVATION @ DRIVEWAY COURT A
1 3/32" = 1'-0"
NORTH ELEVATION @ DRIVEWAY COURT B
2 3/32" = 1'-0"
SOUTH ELEVATION @ DRIVEWAY COURT A
3 3/32" = 1'-0"
SOUTH ELEVATION @ DRIVEWAY COURT B
4 KEYNOTE LEGEND
Key
Value Keynote Text
301 BREEZE BLOCK SCREENING WALL
303 GARAGE DOOR PER SPEC, TYP.
304 CMU PRIVACY WALL W/ PLASTER
FINISH
306 CUSTOM METAL SCREEN
308 EXISTING STONE PILLAR TO REMAIN
Item 2B - Page 279
LEVEL 01
0"
LEVEL 02
11' - 6"

CLERESTORY ROOF
13' - 6"
TYP. OVERALL HEIGHT
24' - 0"
J
L N O
MATCH LINE SEE /2 A3.04
11' - 6" 12' - 6"
24' - 0"
54' - 0"54' - 0"54' - 0"
11' - 0" 6" 2' - 0"
PL 01
PL 01 PL 01 PL 01
?PL 01
PL 01 PL 01 PL 01
PL 01PL 01 PL 01
PL 01PL 01 PL 02

OPEN TO
BEYOND

OPEN TO
BEYOND
301301 301

MAX ALLOWABLE HEIGHT
30' - 0"
LEVEL 01
0"
LEVEL 01
0"
LEVEL 02
11' - 6"

CLERESTORY ROOF
13' - 6"
TYP. OVERALL HEIGHT
24' - 0"

A B D F H J
MATCH LINE SEE /1 A3.04
11' - 6" 12' - 6"
24' - 0"
54' - 0"54' - 0"54' - 0"31' - 2"2' - 10"5' - 0"
8' - 6" 3' - 0" 2' - 0"
PL 01PL 01
PL 01
PL 01 PL 01 PL 01
PL 01PL 02PL 01PL 02 PL 01PL 01

OPEN TO
BEYOND
301

MAX ALLOWABLE HEIGHT
30' - 0"

MAX ALLOWABLE HEIGHT
30' - 0"
C
306
30' - 0"
12' - 0"
PL 01307
LEVEL 01
0"
LEVEL 02
11' - 6"

CLERESTORY ROOF
13' - 6"
TYP. OVERALL HEIGHT
24' - 0"
EGI
MATCH LINE SEE /4 A3.04 72' - 0" 72' - 0"
12' - 6"11' - 6"
24' - 0"
2' - 0"3' - 6"8' - 0"
PL 02
PL 01PL 01
PL 01PL 01PL 02

OPEN TO
BEYOND

OPEN TO
BEYOND

MAX ALLOWABLE HEIGHT
30' - 0"306
301301
MTL 04
LEVEL 01
0"
LEVEL 02
11' - 6"

CLERESTORY ROOF
13' - 6"
TYP. OVERALL HEIGHT
24' - 0"
KMO
MATCH LINE SEE /3 A3.04
12' - 6"11' - 6"
24' - 0"
72' - 0" 72' - 0"
2' - 0"
PL 01
PL 01

OPEN TO
BEYOND

OPEN TO
BEYOND
PL 01

MAX ALLOWABLE HEIGHT
30' - 0"
PL 01
301 304 304 301
CONSULTANTREVISIONSFILENAMEDRAWING TITLEDATESCALEDRAWING NO. [WHEN PRINTED ON 30"X42" SHEET]

NOT FOR

CONSTRUCTIONISSUES
Published:

PROJECT ID
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
3/32" = 1'-0"
1/25/2023 4:13:10 PM
1/25/2023 4:13:10 PM
Palm Canyon
Residences

EXTERIOR ELEVATIONS
A3.04
575 N PALM CANYON DR.

PALM SPRINGS, CA 92262

10.09.20 ENTITLEMENTS

08.04.21 ENTITLEMENTS

11.29.22 ENTITLEMENTS

01.24.23 ENTITLEMENTS
20155
3/32" = 1'-0"
NORTH ELEVATION @ COURTYARD A
1 3/32" = 1'-0"
NORTH ELEVATION @ COURTYARD B
2 3/32" = 1'-0"
SOUTH ELEVATION @ COURTYARD A
3 3/32" = 1'-0"
SOUTH ELEVATION @ COURTYARD B
4 KEYNOTE LEGEND
Key
Value Keynote Text
301 BREEZE BLOCK SCREENING WALL
304 CMU PRIVACY WALL W/ PLASTER
FINISH
306 CUSTOM METAL SCREEN
307 EXISTING HISTORIC MONUMENT TO
REMAIN
Item 2B - Page 280

UP UP UP
UP
UP UP

UP UP UP UP
UP
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CALKING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
ATTEMP

MAIN ENTRY
COURT

POOLSPA

DRIVE AISLE DRIVE AISLE
EAST
ENTRY
COURT

PALM CANYON DRIVE

CHINO DRIVE

PRIVATE
COURTYARDS, TYP.

PRIVATE ENTRY
PATIOS, TYP.

MULTIPURPOSE
LAWN

MULTIPURPOSE
LAWN

OUTDOOR

KITCHEN
PRIVATE COURTYARDS, TYP.

WEST ENTRY
COURT

GATEHOUSE

ARRIVAL

COURTPRIVATE
COURTYARDS, TYP.

BELARDO ROAD
TRASH/

RECYCLING

ENCLOSURE

COMMUNITY

FIRE TABLE
1 L0.32
1 L0.33
1 L0.30
1 L0.31
URBAN
PLAZA

FIRE ACCESS

TURN AROUND
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Overall Site Plan
1" = 20'
L0.20
Item 2B - Page 281
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Illustrated Site Plan -
Ground Floor
1" = 20'
L0.21
Item 2B - Page 282
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Illustrated Site Plan -
Second Floor
1" = 20
L0.22
Item 2B - Page 283
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Illustrated Plan
Enlargment A
1/8" = 1'-0"
L0.30
Item 2B - Page 284
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Illustrated Plan
Enlargement B
1/8" = 1'-0"
L0.31
Item 2B - Page 285
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Illustrated Plan
Enlargement C
1/8" = 1'-0"
L0.32
Item 2B - Page 286
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Illustrated Plan
Enlargement D
1/8" = 1'-0"
L0.33
Item 2B - Page 287
MODEL NO. / DESCRIPTION

IRRIGATION MATERIAL LEGEND
SYMBOL MANUFACTURERDETAIL RADIUSPSI FLOW RATE (GPM)P.R. (TRI.) 30 RAIN BIRD.50 (1.0 TOTAL)1 FT 1.00 IN./HR. A,B RD-06-S 6" POP-UP BUBBLER HEAD WITH A HUNTER MSBN-50Q STREAM BUBBLER NOZZLE EACH SYMBOL REPRESENTS TWO (2) BUBBLER TO PROVIDE A TOTAL OF TWO (2) BUBBLERS PER TREE OR PALM. PLACE THE BUBBLER HEADS SIX (6) INCHES FROM THE ROOT BALL OF THE TREE OR PALM AND ON OPPOSITE SIDES OF TREE OR PALM. ADJUST BUBBLER

STREAMS TO WET THE ROOT BALL AND ADJACENT AMENDED SOIL WITHOUT HITTING THE TRUNK OF THE TREE OR PALM.

HUNTER
O

AS APPROVED

AS APPROVED
N/A

GPH IRRIGATION

PAIGE ELECTRIC
LASCO
P.O.C.

WILKINS
NDS (K.B.I.)
V.I.T.

LASCO

AS APPROVED

BUCKNER

AS APPROVED

WELD-ON

GPH IRRIGATION/
PVC SUPPLY AND DISCHARGE HEADERS SHALL BE PVC LATERAL LINE PIPE (AS SHOWN BELOW), 1" MINIMUM SIZE WITH SCH. 40 PVC FITTINGS.AS APPROVED

NO SYMBOL

NO SYMBOL

NO SYMBOL
33DLRC 3/4" QUICK COUPLER VALVE WITH LOCKING VINYL COVER AND A LASCO G13T-212 SWING JOINT. INSTALL INSIDE A 10" ROUND VALVE BOX.

FOR 1" DRIP ZONES:

FOR 1" DRIP ZONES:

FOR 1 1/2" DRIP ZONES:

RAIN BIRD
HUNTER

WILKINS NO SYMBOL

NO SYMBOL

NO SYMBOL

NO SYMBOL

NO SYMBOL

NO SYMBOL

NO SYMBOL

NO SYMBOL

DESCRIPTION
10" ROUND BOXES

STANDARD RECTANGULAR BOXES

JUMBO RECTANGULAR BOXES
VB-10RNDB (BOX) AND VB-10RND (LID)

VB-STDB (BOX) AND VB-STD (LID)

VB-JMBB (BOX) AND VB-JMB (LID)

SHRUB AREAS (GREEN BOXES AND LIDS)

RAIN BIRD NO SYMBOL
C,D,E
C,D,E
C,D,E
C,D,E
D,F
N/A
G
G
G
H
I
J
K,N
L,N
M,N
P
N/A
Q
Q
R
N/A
N/A
N/A
Q,R,S
S
N/A
N/A
T
NDS (K.B.I.)

RAIN BIRD
TL SERIES 17mm BARBED FITTINGS FOR CONNECTIONS BETWEEN DRIP TUBING (TUBING-TO-TUBING ONLY). NO HEATING OF TUBING SHALL BE ALLOWED.

NETAFIM

NETAFIM

NETAFIM
HUNTER

RAIN BIRD

RAIN BIRD
FOR 1" DRIP ZONES:
100-PESB VALVE AND A PRB-QKCHK-100 PRESSURE REGULATING, 200 MESH BASKET FILTER. IN A STANDARD RECTANGULAR BOX. 100-PESB VALVE AND A QKCHK-100, 200 MESH BASKET FILTER. IN A STANDARD RECTANGULAR BOX. 100-PESB VALVE; A LCRBY-100D, 120 MESH WYE FILTER; AND A PSI-M40X-100 PRESSURE REGULATOR. IN A STD. RECT. BOX.

XCZ-150-PRB-COM; 150-PESB VALVE, TWO PRB-QKCHK-100 PRESSURE REGULATING, 200 MESH BASKET FILTERS, AND A PVC FOR 1 1/2" DRIP ZONES: XCZ-150-LCDR; PESB VALVE, LCRBY-150D, AND A 1 1/2" 40 PSI PRESSURE REGULATOR. IN A JUMBO RECTANGULAR BOX.

SUB-SURFACE DRIP TUBING AS DESCRIBED BELOW:0.53 GPH / EMITTERN/A 300.70 IN./HR.

N LASCO NO SYMBOL
FOR 1 1/2" DRIP ZONES: XCZ-150-LCS; PEB VALVE, LCRBY-150D, AND A 1 1/2" 40 PSI PRESSURE REGULATOR. IN A JUMBO RECTANGULAR BOX.

FITTING ASSEMBLY. IN A JUMBO RECTANGULAR BOX.

CONNECTION BETWEEN HCVXR-CS DRIP TUBING AND PVC SUPPLY AND DISCHARGE HEADERS SHALL BE MADE USING TL DRIP LINE BARBED FITTINGS, SCH. 40 PVC THREADED FITTINGS, SCH. 80 NIPPLES AND FLEXIBLE NIPPLES. WHEN THE CONNECTION IS AT THE END RUN OF THE TUBING USE A 1/2" SCH. 40 PVC THREADED 90° ELBOW, A 1/2" X LENGTH AS REQUIRED SCH. 80 PVC THREADED NIPPLE, A 1/2" X 6" MIPT X FIPT FLEXIBLE NIPPLE, AND A TL050MA 17mm BARB X 1/2" MIPT ADAPTER FITTING. WHEN THE CONNECTION IS IN THE MIDDLE OF THE TUBING RUN USE A 1/2" SCH. 40 PVC THREADED TEE FITTING, A 1/2" X LENGTH AS REQUIRED SCH. 80 PVC THREADED NIPPLE, A 1/2" X 6" MIPT X FIPT FLEXIBLE NIPPLE, AND TWO (2) TL050MA 17mm BARB X 1/2" MIPT ADAPTERS. ALL END RUNS OF TUBING SHALL BE CONNECTED WITH A PVC DISCHARGE HEADER. FLEXIBLE NIPPLES SHALL BE MODEL #GFN050600 AS MANUFACTURED BY GPH IRRIGATION PRODUCTS (866) 582-9684.

TLHCVXR5-CS-12 SUBSURFACE DRIP TUBING (BROWN EXTERIOR COLOR WITH A COPPER OXIDE STRIPE) WITH 0.53 GPH, PRESSURE COMPENSATING EMITTERS INTERNALLY INSTALLED IN THE DRIP TUBING AT 12" O.C. SPACING. DRIP TUBING SHALL BE EQUIPPED WITH A CONTINUOUS EXTERIOR CUPRON STRIPE, COPPER OXIDE INFUSED EMITTERS AND A PHYSICAL BARRIER TO PREVENT ROOT INTRUSION INTO THE DRIP EMITTER. DRIP EMITTERS SHALL BE CONTINUOUS FLUSHING TYPE AND EQUIPPED WITH A CHECK VALVE AND ANTI-SIPHON FEATURE. DRIP TUBING SHALL BE INSTALLED 4" BELOW THE FINISHED SOIL GRADE (NOT COUNTING MULCH) AND IN PARALLEL ROWS A MAXIMUM OF 16" ON CENTER. THE PERIMETER ROW OF DRIP TUBING SHALL BE INSTALLED A MAXIMUM OF 4" FROM THE EDGE OF ANY HARDSCAPE OR TURF EDGE. ALL SUBSEQUENT INTERIOR ROWS SHALL BE ADJUSTED TO PROVIDE AN EVEN SPACING ACROSS THE PLANTER WITHOUT EXCEEDING 16" MAXIMUM SPACING. INSTALL 9" PVC COATED GALVANIZED TUBING STAKES A MAXIMUM OF FIVE (5) FEET ON CENTER ALONG THE LENGTH OF THE TUBING. TUBING STAKES SHALL BE MODEL #GDTS140900 AS MANUFACTURED BY GPH IRRIGATION PRODUCTS (866) 582-9684. THE LINES SHOWN ON THE PLANS REPRESENT THE APPROXIMATE DIRECTION AND SPACING OF THE DRIP TUBING ROWS, SEE SPACING REQUIREMENTS ABOVE AND IN DETAILS.

GDFN DRIP FLUSH / INDICATOR NOZZLE, ORANGE IN COLOR, INSTALLED ONTO A RAIN BIRD 1812 12" POP-UP SPRINKLER BODY (NO PRS DEVICE).

THE FLUSH NOZZLE SHALL BE CLOSED FOR NORMAL OPERATION OF THE DRIP SYSTEM.

PVC PIPE SCH. 40 AS SLEEVING, 2.5 TIMES THE DIAMETER OF PIPE OR WIRE BUNDLE CARRIED (2" MINIMUM SIZE) INSTALL ALL PIPE AND WIRE UNDER PAVING, HARDSCAPE, ETC. (OR AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE) INSIDE SLEEVES. SLEEVES UNDER PEDESTRIAN PAVING SHALL BE INSTALLED 24" BELOW FINISHED GRADE. SLEEVES UNDER VEHICULAR PAVING SHALL BE INSTALLED 36" BELOW FINISHED GRADE.

ALL FITTINGS USED WITH SOLVENT WELD MAINLINE PIPE SHALL BE SCH. 80 PVC FITTINGS, GRAY IN COLOR, AND SIZED TO MATCH THE MAINLINE PIPE. ALL FITTINGS USED WITH SOLVENT WELD LATERAL LINE PIPE SHALL BE SCH. 40 PVC, WHITE IN COLOR, AND SIZED TO MATCH THE LATERAL LINE PIPE. ALL THREADED PVC NIPPLES SHALL BE SCH. 80 PVC PIPE, DARK GRAY IN COLOR, WITH MOLDED THREADS.

ALL SOLVENT WELD CONNECTIONS FOR BOTH MAINLINE AND LATERAL LINE SHALL BE MADE USING THE TWO-STEP PROCESS OF PRIMER AND SOLVENT CEMENT. PRIMER SHALL BE P-68 LOW VOC "PURPLE PRIMER". SOLVENT CEMENT SHALL BE 705 LOW VOC, GRAY COLORED "MEDIUM BODIED" CEMENT.

USE DAUBERS SIZED AT LEAST ONE-HALF THE SIZE OF THE LARGEST PIPE BEING JOINED. ALL SOLVENT CEMENTED JOINTS SHALL BE MADE PER THE PIPE AND FITTING MANUFACTURER'S RECOMMENDATIONS.
11/4" SCH. 40 PVC, GRAY ELECTRICAL CONDUIT FOR FLOW SENSOR / MASTER VALVE WIRES OR CENTRAL CONTROL COMMUNICATION CABLE, PROVIDE PULL BOX AT A MAXIMUM OF 200 FEET ON CENTER FOR A 3 FOOT WIRE LOOP OR ANY SPLICES. INSTALL INSIDE A STANDARD RECTANGULAR VALVE BOX.

P7079D POLYETHYLENE INSULATED, SOLID COPPER CONDUCTOR IRRIGATION CONTROL WIRE #14UF AWG DIRECT BURIAL (U.L. APPROVED). PILOT WIRES SHALL BE RED IN COLOR, COMMON GROUND WIRE SHALL BE WHITE IN COLOR, SPARE WIRES SHALL BE YELLOW IN COLOR. THE CONTRACTOR SHALL ROUTE TWO (2) SPARE CONTROL WIRES (YELLOW) FROM THE CONTROLLER ALONG THE MAINLINE IN ALL DIRECTIONS AWAY FROM THE CONTROLLER. LOOP SPARE WIRES UP AND INTO EACH VALVE BOX ALONG THE MAINLINE, PROVIDING A 3 FOOT MINIMUM LOOP. WHERE MULTIPLE CONTROLLERS ARE USED ON THE PROJECT, EACH CONTROLLER SHALL HAVE A DIFFERENT COLOR FOR PILOT WIRES.

GDBRY6 DIRECT BURIAL, 100% SILICONE GEL, WATER-PROOF WIRE CONNECTORS FOR USE ON ALL WIRE SPLICES AND CONNECTIONS KSC-XXX-S SWING CHECK VALVE, LATERAL LINE SIZE, INSTALL ONE (1) ON THE DOWNSTREAM SIDE OF EACH RCV WHEN THE RCV IS LOWER THAN THE SPRINKLERS, BUBBLERS OR DRIP EMITTERS. INSTALL WITHIN SPRINKLER / BUBBLER / DRIP ZONES AS REQUIRED TO PREVENT LOW HEAD DRAINAGE.

KC-XXX-S SPRING CHECK VALVE, LATERAL LINE SIZE, INSTALL ONE (1) ON THE DOWNSTREAM SIDE OF EACH RCV WHEN THE RCV IS HIGHER THAN THE SPRINKLERS, BUBBLERS OR DRIP EMITTERS. INSTALL WITHIN SPRINKLER / BUBBLER / DRIP ZONES AS REQUIRED TO PREVENT LOW HEAD DRAINAGE.

ALL VALVE BOXES SHALL BE VB SERIES, PLASTIC TYPE WITH OVERLAPPING LIDS. VALVE BOX BODIES AND LIDS SHALL BE GREEN IN COLOR. ALL BOXES SHALL BE SECURED WITH A RAIN BIRD VB-LOCK-H HEXAGON HEAD BOLT, WASHER AND CLIP. BOXES SHALL BE AS SHOWN BELOW:

PVC PIPE 3/4" - 1 1/4" SCH. 40, SOLVENT WELD WITH SCH. 40 PVC FITTINGS, AS LATERAL LINES INSTALLED 12" BELOW FINISHED GRADE PVC PIPE 2" CL. 315, SOLVENT WELD WITH SCH. 80 PVC FITTINGS, AS MAINLINES INSTALLED 18" BELOW FINISHED GRADE 120 VOLT ELECTRICAL POWER FOR CONTROLLER, PROVIDED BY ELECTRICIAN, VERIFY ACTUAL LOCATION IN FIELD RAIN CLIK WIRED RAIN SENSOR, MOUNT IN RGVRSS ENCLOSURE ON THE SIDE OF THE CONTROLLER ENCLOSURE, WIRE TO THE CONTROLLER.

ULTRA-ZONE SCH. 80 PVC MANIFOLD ASSEMBLIES SHALL BE USED TO INSTALL MULTIPLE 1" SIZED REMOTE CONTROL VALVES AND DRIP REMOTE CONTROL VALVES INSIDE A SINGLE STANDARD RECTANGULAR VALVE BOX. USE ALL COMPONENTS DESCRIBED IN THE DETAIL TO INSTALL THE VALVE ASSEMBLY.

PLASTIC DRIP REMOTE CONTROL VALVE ASSEMBLY, SIZE AS SHOWN (1" AND 1 1/2" SIZES). COMPLETE WITH PLASTIC CONTROL VALVE, DRIP FILTER AND PRESSURE REGULATION, AS SHOWN BELOW BY SIZE:

XXX-PESB-PRS-D PRESSURE REGULATING, PLASTIC REMOTE CONTROL VALVE (RCV), SIZE AS SHOWN (1", 1 1/2" AND 2" SIZES), SET PRS-D PRESSURE

REGULATOR TO PROVIDE THE OPERATING PRESSURE OF THE SPRINKLER / BUBBLER HEAD AT THE HIGHEST OR FARTHEST HEAD ON THE CONTROL VALVE ZONE (MEASURE PSI AT HEAD). INSTALL THE RCV INSIDE A STANDARD RECTANGULAR VALVE BOX.

VXX101N-SC XX" SLO-CLOSE SCH. 80 PVC, TRUE-UNION BALL VALVE WITH SOLVENT WELD SOCKET CONNECTIONS, LINE SIZE PER MAINLINE.

INSTALL INSIDE A 10" ROUND VALVE BOX.
3200-XX0 XX" NORMALLY CLOSED, BRASS MASTER CONTROL VALVE. WIRE MCV TO THE CONTROLLER USING A SEPARATE PILOT AND GROUND WIRE, ROUTE INSIDE CONDUIT WITH FLOW SENSOR WIRE. INSTALL INSIDE A STANDARD RECTANGULAR VALVE BOX.

FCT-XXX, X" FLOW SENSOR, WIRE TO CONTROLLER USING TWO (2) #14UF AWG WIRES INSIDE A 1" SCH. 40 PVC (GRAY) ELECTRICAL CONDUIT. INSTALL PER MANUFACTURER'S RECOMMENDATIONS AND INSIDE A STANDARD RECTANGULAR VALVE BOX.

STRONG BOX SBBC-XXSS "SMOOTH TOUCH" STAINLESS STEEL BACK FLOW DEVICE ENCLOSURE 500XL-HLR XX" BRONZE, HIGH LOW RANGE (10-125 PSI) PRESSURE REGULATOR, WITH SINGLE UNION FIPT X FIPT CONNECTIONS, INSTALL PRESSURE REGULATOR ON THE DOWNSTREAM SIDE OF THE BACK FLOW DEVICE. SET WATER PRESSURE TO 10 PSI ABOVE DESIGN PRESSURE SHOWN ON POC NOTES. 975XLS, 3/4" - 2" R/P BACK FLOW PREVENTION DEVICE WITH WYE STRAINER, INSTALL WITH BRASS NIPPLES, UNIONS AND FITTINGS, SIZED PER DEVICE X" POTABLE (DOMESTIC) / RECYCLED (RECLAIMED) DEDICATED IRRIGATION WATER METER WITH X" SERVICE LINE. VERIFY SIZE, LOCATION AND PRESSURE IN FIELD.

IC-600-SS 6 STATION I-CORE CONTROLLER WITH FOUR (4) ICM-600 6-STATION EXPANSION MODULES TO CREATE AN 30 STATION CONTROLLER WITHIN A STAINLESS STEEL WALL MOUNTED ENCLOSURE.

Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Irrigation Legend
and Notes
N.T.S
L6.00

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN

I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE

WATER EFFICIENT LANDSCAPE ORDINANCE AND SUBMIT A
COMPLETE LANDSCAPE DOCUMENTATION PACKAGESIGNATURE: DATE:
01-24-23

1. ALL LOCAL MUNICIPAL AND STATE LAWS, RULES AND REGULATIONS GOVERNING OR RELATING TO ANY PORTION OF

THIS WORK ARE HEREBY INCORPORATED INTO AND MADE A PART OF THESE SPECIFICATIONS AND THEIR PROVISIONS SHALL BE CARRIED OUT BY THE CONTRACTOR.

2. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES, STRUCTURES AND SERVICES BEFORE COMMENCING WORK. THE LOCATIONS OF UTILITIES, STRUCTURES AND SERVICES SHOWN IN THESE PLANS ARE APPROXIMATE ONLY. ANY DISCREPANCIES BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE.

3. THE CONTRACTOR SHALL OBTAIN THE PERTINENT ENGINEERING OR ARCHITECTURAL PLANS BEFORE BEGINNING WORK.

4. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS REQUIRED TO PERFORM THE WORK INDICATED HEREIN BEFORE BEGINNING WORK.

5. THIS DESIGN IS DIAGRAMMATIC. ALL EQUIPMENT SHOWN IN PAVED AREAS IS FOR DESIGN CLARITY ONLY AND IS TO BE INSTALLED WITHIN PLANTING AREAS.

6. THE CONTRACTOR SHALL NOT WILLFULLY INSTALL ANY EQUIPMENT AS SHOWN ON THE PLANS WHEN IT IS OBVIOUS

IN THE FIELD THAT UNKNOWN CONDITIONS EXIST THAT WERE NOT EVIDENT AT THE TIME THESE PLANS WERE PREPARED. ANY SUCH CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE

PRIOR TO ANY WORK OR THE IRRIGATION CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR ANY FIELD CHANGES DEEMED NECESSARY BY THE OWNER.

7. INSTALL ALL EQUIPMENT AS SHOWN IN THE DETAILS AND SPECIFICATIONS. CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH LOCAL CITY, COUNTY AND STATE REQUIREMENTS FOR BOTH EQUIPMENT AND INSTALLATION.

8. ACTUAL LOCATION FOR THE INSTALLATION OF THE BACKFLOW PREVENTER AND THE AUTOMATIC CONTROLLER IS TO BE DETERMINED IN THE FIELD BY THE OWNER'S AUTHORIZED REPRESENTATIVE.

9. CONTRACTOR IS TO PROVIDE AN ADDITIONAL PILOT WIRE FROM CONTROLLER ALONG ENTIRETY OF MAIN LINE TO THE LAST RCV ON EACH AND EVERY LEG OF MAIN LINE. LABEL SPARE WIRES AT BOTH ENDS.

10. ALL PIPE UNDER PAVED AREAS TO BE INSTALLED IN SLEEVING TWICE THE DIAMETER OF THE PIPE CARRIED. SEE LEGEND FOR TYPE. ALL WIRE UNDER PAVED AREAS TO BE INSTALLED IN A SCH. 40 SLEEVE THE SIZE REQUIRED TO EASILY PULL WIRE THROUGH. ALL SLEEVES TO BE INSTALLED WITH A MINIMUM DEPTH AS SHOWN ON THE SLEEVING DETAILS. SLEEVES TO EXTEND AT LEAST 12" PAST THE EDGE OF THE PAVING.

11. ALL QUICK COUPLER AND REMOTE CONTROL VALVES TO BE INSTALLED IN SHRUB OR GROUND COVER AREAS WHERE POSSIBLE. ALL QUICK COUPLER AND REMOTE CONTROL VALVES TO BE INSTALLED AS SHOWN ON THE INSTALLATION DETAILS. INSTALL ALL QUICK COUPLER AND REMOTE CONTROL VALVES WITHIN 18" OF HARDSCAPE.

12. ALL HEADS ARE TO BE INSTALLED WITH THE NOZZLE, SCREEN AND ARCS SHOWN ON THE PLANS. ALL HEADS ARE TO BE ADJUSTED TO PREVENT OVERSPRAY ONTO BUILDINGS, WALLS, FENCES AND HARDSCAPE. THIS INCLUDES,

BUT NOT LIMITED TO, ADJUSTMENT OF DIFFUSER PIN OR ADJUSTMENT SCREW, REPLACEMENT OF PRESSURE

COMPENSATING SCREENS, REPLACEMENT OF NOZZLES WITH MORE APPROPRIATE RADIUS UNITS AND THE REPLACEMENT OF NOZZLES WITH ADJUSTABLE ARC UNITS.

13. CONTRACTOR SHALL INSTALL ADDITIONAL CHECK VALVES TO HEADS AND LATERALS AS REQUIRED TO PREVENT LOW HEAD DRAINAGE.

14. THE CONTRACTOR SHALL USE PROPER GROUNDING TECHNIQUES FOR GROUNDING THE CONTROLLER AND RELATED EQUIPMENT PER MANUFACTURERS SPECIFICATIONS. SWEENEY AND ASSOCIATES RECOMMENDS

MEASURING FOR PROPER GROUND AT LEAST ONCE ANNUALLY, AND NECESSARY ADJUSTMENTS MADE TO COMPLY WITH MANUFACTURER SPECIFICATIONS.

15. THE CONTRACTOR IS REQUIRED TO CONTACT DIGALERT OR 811 A MINIMUM OF TWO (2) DAYS PRIOR TO THE START

OF ANY EXCAVATIONS ON THE PROJECT AND SPECIFICALLY PRIOR TO THE INSTALLATION OF ANY GROUNDING RODS. DIAL 811 OR LOG ONTO WWW.DIGALERT.ORG TO START A PROJECT TICKET. DIGALERT AND 811 IS A FREE SERVICE PROVIDED TO THE PROJECT. FAILURE TO CONTACT AND HAVE THE EXISTING UTILITIES IDENTIFIED, LOCATED AND MARKED SHALL MAKE THE CONTRACTOR SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES.

IRRIGATION NOTES
Item 2B - Page 288

UP UP UP
UP
UP UP
UP

UP UP UP
UP
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84CAL
KING72X84
ATTEMP
1 L6.12
1 L6.13
1 L6.10
1 L6.11
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Overall Irrigation
Plan
########
L6.01

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN
IRRIGATION POINT OF CONNECTION #1;
IRRIGATION CONTROLLER "A";
Item 2B - Page 289
UP
UP
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Irrigation Plan A
1/8" = 1'-0"
L6.10

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN
IRRIGATION POINT OF CONNECTION #1;
REFER TO NOTE "A"
NOTE A:

POINT OF CONNECTION (POC) #1 SHALL BE A X" DOMESTIC / RECYCLED WATER METER WITH A X" SERVICE LINE. THE CONTRACTOR SHALL VERIFY THE ACTUAL LOCATION,

WATER TYPE, METER SIZE AND WATER PRESSURE IN THE FIELD PRIOR TO STARTING WORK. MEASUREMENT OF THE STATIC (NO WATER MOVING) WATER PRESSURE IS

ACCEPTABLE FOR POTABLE WATER SYSTEMS WHERE NO PUMP HAS BEEN INDICATED ON THESE PLANS. WHEN USING RECYCLED WATER, OR ON POTABLE WATER SYSTEMS

REQUIRING A PUMP, ONLY THE MEASUREMENT OF DYNAMIC (WATER MOVING THROUGH THE METER) WATER PRESSURE, SHALL BE ACCEPTABLE. THE DYNAMIC WATER

PRESSURE SHALL BE MEASURED AT THE MAXIMUM SYSTEM DEMAND AS INDICATED BELOW. IF ANY OF THE POC INFORMATION SHOWN ON THESE DRAWING IS FOUND TO

BE DIFFERENT THAN THE ACTUAL POC INFORMATION GATHERED IN THE FIELD, IMMEDIATELY NOTIFY THE LANDSCAPE ARCHITECT AND IRRIGATION CONSULTANT.

SHOULD THE CONTRACTOR FAIL TO VERIFY THE POC INFORMATION AS SHOWN HEREIN,

ANY CHANGES REQUIRED BY LOW PRESSURE OR VOLUME SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

WATER PRESSURE AT POC: N/A PSI (STATIC / DYNAMIC)
DESIGN WATER PRESSURE: N/A PSI
MAXIMUM SYSTEM DEMAND: N/A GPM
PRESSURE BOOST REQUIRED: N/A PSI
RESIDUAL WATER PRESSURE: N/A PSI
NOTE B:

THESE PLANS ARE DIAGRAMMATIC, THE MAINLINE AND RELATED IRRIGATION EQUIPMENT IS SHOWN WITHIN THE PAVING FOR CLARITY ONLY. THE ACTUAL LOCATION

OF MAINLINE AND RELATED IRRIGATION EQUIPMENT SHALL BE WITHIN PLANTER AND A MINIMUM OF 18" OFF ADJACENT HARDSCAPE AND OTHER OBSTACLES, TYPICAL.

NOTE C:

THESE PLANS ARE DIAGRAMMATIC, TREE BUBBLERS AND LATERAL LINES ARE SHOWN

WITHIN THE PAVING FOR CLARITY ONLY, THE ACTUAL LOCATIONS SHALL BE WITHIN THE PLANTER. THE TREE BUBBLERS SHALL BE ALIGNED WITH TREES AS SHOWN ON THE PLANTING PLANS, AND AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE. THE

CONTRACTOR SHALL CONFIRM ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE D:

PRIOR TO START OF CONSTRUCTION THE CONTRACTOR SHALL SUBMIT TO THE OWNER

AND LANDSCAPE ARCHITECT A SCALED SHOP DRAWING INDICATING THE PROPOSED LOCATIONS FOR THE IRRIGATION EQUIPMENT LISTED BELOW. THE SHOP DRAWING

SHALL BE PREPARED TO THE SATISFACTION OF THE OWNER AND LANDSCAPE ARCHITECT. SHOP DRAWINGS MUST INCLUDE THE PROPOSED LOCATIONS FOR THE FOLLOWING ITEMS:

1. POINT OF CONNECTION (INCLUDING WATER POC, BACK FLOW DEVICES, MASTER CONTROL VALVES, FLOW SENSORS, ETC.)

2. ISOLATION VALVES

3. AUTOMATIC CONTROL VALVES (INDICATE STATION NUMBER)

4. QUICK COUPLING VALVES

5. IRRIGATION CONTROLLER(S)

6. RELATED EQUIPMENT (AS MAY BE DIRECTED).

EACH PIECE OF AFOREMENTIONED EQUIPMENT SHALL HAVE IT'S PROPOSED INSTALLED LOCATION SHOWN ON THE SHOP DRAWINGS. THE SYMBOL FOR EACH PRODUCT SHALL

BE A SCALED REPRESENTATION OF THE FOOTPRINT OF THE EQUIPMENT OR THE VALVE BOX IN WHICH THE EQUIPMENT IS INSTALLED. CONTRACTOR SHALL INSTALL ALL VALVE BOXES AND RELATED EQUIPMENT PER THE OWNER APPROVED SHOP DRAWINGS. ONCE

THE SHOP DRAWING LOCATIONS ARE APPROVED, THE LANDSCAPE ARCHITECT OR

OWNER'S AUTHORIZED REPRESENTATIVE WILL ALLOW NO ADJUSTMENTS TO THE APPROVED VALVE BOX PLACEMENT WITHOUT PRIOR WRITTEN ACCEPTANCE. ANY

IRRIGATION EQUIPMENT INSTALLED WITHOUT PRIOR APPROVAL WITH SHOP DRAWINGS

WILL BE SUBJECT TO RELOCATION BASED ON DIRECTION BY THE LANDSCAPE ARCHITECT AT THE CONTRACTOR'S EXPENSE.

Item 2B - Page 290
UP UP
UP

UP UP UP
CAL
KING72X84
CAL
KING72X84
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Irrigation Plan B
1/8" = 1'-0"
L6.11
NOTE A:

CONTROLLER "A" SHALL BE OF THE BRAND, MODEL AND STATION SIZE AS INDICATED ON THE IRRIGATION MATERIALS LEGEND. THE CONTROLLER SHALL BE INSTALLED IN THE APPROXIMATE LOCATION SHOWN. THE CONTRACTOR SHALL COORDINATE THE

REQUIRED ELECTRICAL POWER SUPPLY AT THIS LOCATION WITH THE OWNER'S AUTHORIZED REPRESENTATIVE. FINAL LOCATION OF CONTROLLER AND ELECTRICAL

POINT OF CONNECTION SHALL BE CONFIRMED WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE B:

THESE PLANS ARE DIAGRAMMATIC, THE MAINLINE AND RELATED IRRIGATION EQUIPMENT IS SHOWN WITHIN THE PAVING FOR CLARITY ONLY. THE ACTUAL LOCATION

OF MAINLINE AND RELATED IRRIGATION EQUIPMENT SHALL BE WITHIN PLANTER AND A MINIMUM OF 18" OFF ADJACENT HARDSCAPE AND OTHER OBSTACLES, TYPICAL.

NOTE C:

THESE PLANS ARE DIAGRAMMATIC, TREE BUBBLERS AND LATERAL LINES ARE SHOWN

WITHIN THE PAVING FOR CLARITY ONLY, THE ACTUAL LOCATIONS SHALL BE WITHIN THE PLANTER. THE TREE BUBBLERS SHALL BE ALIGNED WITH TREES AS SHOWN ON THE PLANTING PLANS, AND AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE. THE

CONTRACTOR SHALL CONFIRM ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN
IRRIGATION CONTROLLER "A";
REFER TO NOTE "B"
NOTE D:

PRIOR TO START OF CONSTRUCTION THE CONTRACTOR SHALL SUBMIT TO THE OWNER

AND LANDSCAPE ARCHITECT A SCALED SHOP DRAWING INDICATING THE PROPOSED LOCATIONS FOR THE IRRIGATION EQUIPMENT LISTED BELOW. THE SHOP DRAWING

SHALL BE PREPARED TO THE SATISFACTION OF THE OWNER AND LANDSCAPE ARCHITECT. SHOP DRAWINGS MUST INCLUDE THE PROPOSED LOCATIONS FOR THE FOLLOWING ITEMS:

1. POINT OF CONNECTION (INCLUDING WATER POC, BACK FLOW DEVICES, MASTER CONTROL VALVES, FLOW SENSORS, ETC.)

2. ISOLATION VALVES

3. AUTOMATIC CONTROL VALVES (INDICATE STATION NUMBER)

4. QUICK COUPLING VALVES

5. IRRIGATION CONTROLLER(S)

6. RELATED EQUIPMENT (AS MAY BE DIRECTED).

EACH PIECE OF AFOREMENTIONED EQUIPMENT SHALL HAVE IT'S PROPOSED INSTALLED LOCATION SHOWN ON THE SHOP DRAWINGS. THE SYMBOL FOR EACH PRODUCT SHALL

BE A SCALED REPRESENTATION OF THE FOOTPRINT OF THE EQUIPMENT OR THE VALVE BOX IN WHICH THE EQUIPMENT IS INSTALLED. CONTRACTOR SHALL INSTALL ALL VALVE BOXES AND RELATED EQUIPMENT PER THE OWNER APPROVED SHOP DRAWINGS. ONCE

THE SHOP DRAWING LOCATIONS ARE APPROVED, THE LANDSCAPE ARCHITECT OR

OWNER'S AUTHORIZED REPRESENTATIVE WILL ALLOW NO ADJUSTMENTS TO THE APPROVED VALVE BOX PLACEMENT WITHOUT PRIOR WRITTEN ACCEPTANCE. ANY

IRRIGATION EQUIPMENT INSTALLED WITHOUT PRIOR APPROVAL WITH SHOP DRAWINGS

WILL BE SUBJECT TO RELOCATION BASED ON DIRECTION BY THE LANDSCAPE ARCHITECT AT THE CONTRACTOR'S EXPENSE.

Item 2B - Page 291
UP
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CALKING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CALKING72X84
CAL
KING72X84
CAL
KING72X84
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Irrigation Plan C
1/8" = 1'-0"
L6.12
NOTE A:

THESE PLANS ARE DIAGRAMMATIC, THE MAINLINE AND RELATED IRRIGATION EQUIPMENT IS SHOWN WITHIN THE PAVING FOR CLARITY ONLY. THE ACTUAL LOCATION OF MAINLINE AND RELATED IRRIGATION EQUIPMENT SHALL BE WITHIN PLANTER AND A MINIMUM OF 18" OFF ADJACENT HARDSCAPE AND OTHER OBSTACLES, TYPICAL.

NOTE B:

THESE PLANS ARE DIAGRAMMATIC, TREE BUBBLERS AND LATERAL LINES ARE SHOWN WITHIN THE PAVING FOR CLARITY ONLY, THE ACTUAL LOCATIONS SHALL BE WITHIN THE PLANTER. THE TREE BUBBLERS SHALL BE ALIGNED WITH TREES AS SHOWN ON THE PLANTING PLANS, AND AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE. THE CONTRACTOR SHALL CONFIRM ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE C:

PRIOR TO START OF CONSTRUCTION THE CONTRACTOR SHALL SUBMIT TO THE OWNER AND LANDSCAPE ARCHITECT A SCALED SHOP DRAWING INDICATING THE PROPOSED LOCATIONS FOR THE IRRIGATION EQUIPMENT LISTED BELOW. THE SHOP DRAWING SHALL BE PREPARED TO THE SATISFACTION OF THE OWNER AND LANDSCAPE ARCHITECT. SHOP DRAWINGS MUST INCLUDE THE PROPOSED LOCATIONS FOR THE FOLLOWING ITEMS:

1. POINT OF CONNECTION (INCLUDING WATER POC, BACK FLOW DEVICES, MASTER CONTROL VALVES, FLOW SENSORS, ETC.)

2. ISOLATION VALVES

3. AUTOMATIC CONTROL VALVES (INDICATE STATION NUMBER)

4. QUICK COUPLING VALVES

5. IRRIGATION CONTROLLER(S)

6. RELATED EQUIPMENT (AS MAY BE DIRECTED).

EACH PIECE OF AFOREMENTIONED EQUIPMENT SHALL HAVE IT'S PROPOSED INSTALLED LOCATION SHOWN ON THE SHOP DRAWINGS. THE SYMBOL FOR EACH PRODUCT SHALL BE A SCALED REPRESENTATION OF THE FOOTPRINT OF THE EQUIPMENT OR THE VALVE BOX IN WHICH THE EQUIPMENT IS INSTALLED. CONTRACTOR SHALL INSTALL ALL VALVE BOXES AND RELATED EQUIPMENT PER THE OWNER APPROVED SHOP DRAWINGS. ONCE THE SHOP DRAWING LOCATIONS ARE

APPROVED, THE LANDSCAPE ARCHITECT OR OWNER'S AUTHORIZED REPRESENTATIVE WILL ALLOW NO ADJUSTMENTS TO THE APPROVED VALVE BOX PLACEMENT WITHOUT PRIOR WRITTEN ACCEPTANCE. ANY IRRIGATION EQUIPMENT

INSTALLED WITHOUT PRIOR APPROVAL WITH SHOP DRAWINGS WILL BE SUBJECT TO RELOCATION BASED ON DIRECTION BY THE LANDSCAPE ARCHITECT AT THE CONTRACTOR'S EXPENSE.

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN
Item 2B - Page 292
UP
UP
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CALKING72X84
CAL
KING72X84
ATTEMP
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Irrigation Plan D
1/8" = 1'-0"
L6.13

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN
NOTE A:

THESE PLANS ARE DIAGRAMMATIC, THE MAINLINE AND RELATED IRRIGATION EQUIPMENT IS SHOWN WITHIN THE PAVING FOR CLARITY ONLY. THE ACTUAL LOCATION OF MAINLINE AND RELATED IRRIGATION EQUIPMENT SHALL BE WITHIN PLANTER AND A MINIMUM OF 18" OFF ADJACENT HARDSCAPE AND OTHER OBSTACLES, TYPICAL.

NOTE B:

THESE PLANS ARE DIAGRAMMATIC, TREE BUBBLERS AND LATERAL LINES ARE SHOWN WITHIN THE PAVING FOR CLARITY ONLY, THE ACTUAL LOCATIONS SHALL BE WITHIN THE PLANTER. THE TREE BUBBLERS SHALL BE ALIGNED WITH TREES AS SHOWN ON THE PLANTING PLANS, AND AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE. THE CONTRACTOR SHALL CONFIRM ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE C:

PRIOR TO START OF CONSTRUCTION THE CONTRACTOR SHALL SUBMIT TO THE OWNER AND LANDSCAPE ARCHITECT A SCALED SHOP DRAWING INDICATING THE PROPOSED LOCATIONS FOR THE IRRIGATION EQUIPMENT LISTED BELOW. THE SHOP DRAWING SHALL BE PREPARED TO THE SATISFACTION OF THE OWNER AND LANDSCAPE ARCHITECT. SHOP DRAWINGS MUST INCLUDE THE PROPOSED LOCATIONS FOR THE FOLLOWING ITEMS:

1. POINT OF CONNECTION (INCLUDING WATER POC, BACK FLOW DEVICES, MASTER CONTROL VALVES, FLOW SENSORS, ETC.)

2. ISOLATION VALVES

3. AUTOMATIC CONTROL VALVES (INDICATE STATION NUMBER)

4. QUICK COUPLING VALVES

5. IRRIGATION CONTROLLER(S)

6. RELATED EQUIPMENT (AS MAY BE DIRECTED).

EACH PIECE OF AFOREMENTIONED EQUIPMENT SHALL HAVE IT'S PROPOSED INSTALLED LOCATION SHOWN ON THE SHOP DRAWINGS. THE SYMBOL FOR EACH PRODUCT SHALL BE A SCALED REPRESENTATION OF THE FOOTPRINT OF THE EQUIPMENT OR THE VALVE BOX IN WHICH THE EQUIPMENT IS INSTALLED. CONTRACTOR SHALL INSTALL ALL VALVE BOXES AND RELATED EQUIPMENT PER THE OWNER APPROVED SHOP DRAWINGS. ONCE THE SHOP DRAWING LOCATIONS ARE

APPROVED, THE LANDSCAPE ARCHITECT OR OWNER'S AUTHORIZED REPRESENTATIVE WILL ALLOW NO ADJUSTMENTS TO THE APPROVED VALVE BOX PLACEMENT WITHOUT PRIOR WRITTEN ACCEPTANCE. ANY IRRIGATION EQUIPMENT

INSTALLED WITHOUT PRIOR APPROVAL WITH SHOP DRAWINGS WILL BE SUBJECT TO RELOCATION BASED ON DIRECTION BY THE LANDSCAPE ARCHITECT AT THE CONTRACTOR'S EXPENSE.

Item 2B - Page 293
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Irrigation Details
N.T.S
L6.20

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN

BACKFLOW DEVICEG

TREE BUBBLER LAYOUTB
SECTION VIEW - N.T.S.
12" POP-UP HEAD SWING JOINT CONFIGURATION
TWELVE (12) INCH POP-UP SPRINKLER HEAD
SIX (6) INCH POP-UP SPRINKLER HEAD
12"

LEGEND AND PIPE INSTALLATION DETAIL

FINISHED GRADE AT DEPTH SHOWN ON

PVC LATERAL LINE PIPE, TYPE AND SIZE AS

SHOWN ON DRAWINGS, INSTALL BELOW
1/2" SIZE WITH FIPT THREADS
SCH 40 PVC SxSxT TEE FITTING, LATERAL X LATERAL X
INSTALL SPRAY HEADS 4" FROM PAVING EDGE IN TURF AREAS.

AREA WITHOUT OVERSPRAY ONTO PAVING, FENCES, WALLS OR BUILDINGS.

INSTALL SPRAY HEADS PLUMB. ADJUST NOZZLE STREAM TO COVER THE LANDSCAPE INSTALL SPRAY HEADS 6" FROM PAVING EDGE IN SHRUB AND GROUND COVER AREAS.

INSTALL SPRAY HEADS 12" FROM THE FACE OF BUILDING WALLS OR WINDOWS.

NOTE:

INLET HAS 1/2" NPT THREADS.

FINISHED GRADE IN TURF AREAS

INSTALL POP-UP SPRAY HEAD FLUSH WITH

GRADE IN SHRUB AND GROUND COVER AREAS
INSTALL POP-UP SPRAY HEAD 1/2" ABOVE FINISHED

UNDISTURBED SOIL
MODEL, FEATURES, AND NOZZLES REQUIRED. SPRINKLER
POP-UP SPRAY HEAD, 6" - 12" HEIGHT, SEE LEGEND FOR BRAND, 1/2"
PRE-ASSEMBLED POLY, TRIPLE SWING JOINT, 1/2"
MIPT INLET AND OUTLET WITH A 12" LAY LENGTH,
SAME MANUFACTURER AS SPRINKLER HEAD.

WITH PVC STREET ELL. 6" POP-UP HEAD
CONFIGURATION SHOWN.

FLUSH VALVE/INDICATOR HEADF
NOTE:

INSTALL INDICATOR HEAD 10" FROM THE EDGE OF PAVING OR THE PLANTER EDGE.

INSTALL ORANGE COLORED INDICATOR NOZZLE ON POP-UP HEAD AND ADJUST TO FULLY CLOSED.

INSTALL POP-UP INDICATOR HEAD
1/2" ABOVE FINISHED GRADE IN
INSTALL POP-UP INDICATOR HEAD 10"

OFF OF PAVEMENT OR THE EDGE OF
SCH 40 PVC SxSxT TEE FITTING,
LATERAL X LATERAL X 1/2" SIZE

SIZE AS SHOWN ON LEGEND, OR

DRIP SYSTEM DISCHARGE HEADER,
1 1/4" MINIMUM SIZE PER THE DRIP

INSTALLATION DETAILS

PVC LATERAL LINE PIPE, TYPE AND
4"

PLANTED AREA SERVED BY DRIP TUBING
6"

POP-UP INDICATOR HEAD, WITH A

GPH IRRIGATION DRIP FLUSH NOZZLE,
MODEL #GDFN, ORANGE COLORED

NOZZLE TO REMAIN IN THE CLOSED
1/2"

SHRUB AND GROUND COVER AREAS

UNDISTURBED SOIL

WITH FIPT THREADS
12"

DISCHARGE HEADER SHALL BE
INSTALLED 12" BELOW FINISHED

SOIL GRADE, TYPICAL

SUBSURFACE DRIP TUBING, DEPTH

AS SHOWN ON LEGEND AND DETAIL
12" POP-UP HEAD, SEE LEGEND

POSITION DURING SYSTEM OPERATION
AND OPENED FOR SYSTEM FLUSHING.

DIRECT FLUSH STREAM INTO PLANTER.

DRIP CONNECTION ASSEMBLY, SEE

DRIP TUBING CONNECTION DETAIL
SECTION VIEW - N.T.S.

PRE-ASSEMBLED POLY, TRIPLE
SWING JOINT, 1/2" MIPT INLET AND
OUTLET WITH A 12" LAY LENGTH, GPH
IRRIGATION MODEL #GSJ0512. WITH
PVC STREET ELL.

DRIP CONNECTIONC

DRIP TUBING LAYOUTE

UNDISTURBED SOIL

ROOT BALL OF TREE OR PALM

AMENDED BACKFILL MIX, SEE PLANTING PLANS

DRIP LINE OF CANOPY TREE OR PALM
6" POP-UP STREAM BUBBLER HEAD WITH
A 90° ARC PATTERN THREE (3) STREAM

BUBBLER NOZZLE, SEE THE LEGEND FOR ALL
3/4" PVC LATERAL LINE PIPE FROM RCV
REQUIRED COMPONENTS. ADJUST THE

NOZZLE STREAMS TO WET THE ROOT BALL
S
3/4" PVC LATERAL LINE PIPE
3/4" PVC TEE FITTING
AND AMENDED SOIL AREA WITHOUT HITTING.

PLAN VIEW - N.T.S.
6"
THE TRUNK OF THE TREE OR PALM. SEE
POP-UP SPRINKLER DETAIL FOR INSTALLATION.

POSITION MSBN-25Q STREAM BUBBLER HEADS 1" FROM THE ROOT BALL.

S
NOTE:

POSITION MSBN-50Q STREAM BUBBLER HEADS 6" FROM THE ROOT BALL.

THE SOIL LEVEL IN THE PLANTER AREAS BE BROUGHT TO 4.5" BELOW FINISHED

GRADE AND PROPERLY COMPACTED AS PER THE LANDSCAPED DRAWINGS PRIOR WIRE HOOP STAKES AT 5 FEET ON CENTER SPACING.

INSTALL TUBING AS INDICATED ON THESE DRAWINGS AND SECURE TO GRADE USING TO THE INSTALLATION OF THE TUBING.

TO INSURE EVEN PARALLEL AND LEVEL TUBING ROWS IT IS RECOMMENDED THAT RECOMMENDED INSTALLATION:

AMENDED SOIL*
AMENDED SOIL/*

INSTALLED AFTER

TUBING INSTALLATION

FINISHED GRADE

TUBING INSTALLATION
BRING SOIL LEVEL * AS PER LANDSCAPE DRAWINGS

WIRE STAKE
TO 4.5" BELOW

PRIOR TO DRIP
4"

DRIP TUBING
BACKFILL FINAL 4.5" OF SOIL OVER THE TUBING AFTER INSTALLATION OF THE TUBING AND OBSERVATION BY THE OWNER'S AUTHORIZED REPRESENTATIVE.

DRIP TUBING LAYOUT (SECTION)D
SECTION VIEW - N.T.S. SECTION VIEW - N.T.S.

TURF, SEE PLANTING PLANS
INSTALLED FIVE (5) FEET ON CENTER

HEADER, PVC LATERAL LINE PIPE,
1" MINIMUM SIZE, OTHERWISE
6" IN TURF AREAS
TWO ADAPTER FITTINGS FOR THE CONNECTION.

FOR CONNECTIONS IN THE MIDDLE OF RUNS OF TUBING, USE A TEE FITTING AND NOTE:

DRIP TUBING CONNECTION REQUIRED FOR ALL CONNECTIONS BETWEEN DRIP TUBING AND PVC HEADERS.

FOR CONNECTIONS AT END RUNS OF TUBING, USE A 90° ELL FITTING AND ONE ADAPTER FITTING FOR CONNECTION.

FOR TEE FITTING, ONE (1) FOR 90° ELL

SHRUBS OR GROUND COVERS,

INLINE DRIP TUBING WITH

INTERNAL DRIP EMITTERS,

SEE LEGEND FOR BRAND,

MODEL AND PERFORMANCE
ADAPTER FITTING, TWO (2) REQUIRED
1/2" MIPT X 17mm BARB MALE

MULCH LAYER, SEE PLANTING PLANS

FINISHED GRADE

SEE PLANTING PLANS

SIZE PER THE DRAWINGS
SCH. 80 PVC THREADED NIPPLE,
1/2" X LENGTH AS REQUIRED

AMENDED SITE SOIL
12" MINIMUM

GPH IRRIGATION PRODUCTS FLEXIBLE NIPPLE,
TEE FITTING, HEADER SIZE BY 1/2"

FINISHED GRADE
#GFN050600, 1/2" MIPT X 1/2" FIPT X 6" LENGTH
SCH. 40 PVC SLIP X SLIP X 1/2" FIPT

DRIP TUBING SUPPLY OR DISCHARGE
4" IN SHRUB BEDS
GPH IRRIGATION PRODUCTS 9" PVC
COATED WIRE STAKE, #GDTS140900,
OR 90° ELL FITTING, 1/2" SIZE
SCH. 40 PVC THREADED TEE

POP-UP SPRINKLER HEADA
2"

BRASS NIPPLES, LENGTHS AS REQUIRED

COPPER FEMALE ADAPTER

TYPE K COPPER PIPE FROM WATER METER
"SMOOTH TOUCH" STAINLESS STEEL
BRASS NIPPLE, 12" MINIMUM LENGTH

FINISH GRADE
BRASS THREADED 90° ELL, FOUR (4)

R/P PRINCIPLE BACKFLOW DEVICE WITH
B
B
B
B C
BBB
A BRONZE WYE STRAINER AND TWO (2)

BRASS BALL VALVES, SEE LEGEND FOR

BACKFLOW ASSEMBLY ENCLOSURE
BRASS UNION, ONE (1) REQUIRED IF A

CONCRETE SLAB
SPEARS 835-0XXSR SPECIAL REINFORCED

PVC MAINLINE TO MASTER VALVE
12" MIN.

FLOW

BRAND, MODEL AND SIZE

IF SPECIFIED
B

PRESSURE REGULATOR, IF SPECIFIED
SECTION VIEW - N.T.S.

W
L
K
I
IS N
500
PRV IS SPECIFIED, TWO (2) REQUIRED
IF PRV NOT SPECIFIED, ONE (1) PER LEG
CONCRETE SLAB SHALL BE A MINIMUM OF 4" THICK, 18" WIDE AND EXTEND AT LEAST 8" PAST THE BACKFLOW ASSEMBLY PIPING, OR BE THE SIZE REQUIRED BY THE ENCLOSURE MANUFACTURER.

USE AN APPROVED, NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS.

ASSEMBLY PIPING AND FITTINGS SHALL BE SIZED EQUAL TO THE SIZE OF THE BACKFLOW PREVENTION DEVICE BACKFLOW DEVICE OUTLET SHALL BE INSTALLED A MINIMUM OF 12" ABOVE FINISHED GRADE.

NOTE:

INSTALL THE PRESSURE REGULATOR ONLY IF IT IS SPECIFIED IN THE LEGEND.

BP
SCH 80 PVC FEMALE ADAPTER
NO THREADED CONNECTIONS SHALL BE MADE UNDER THE CONCRETE SLAB.

REQUIRED, TYPICAL
PLAN VIEW - N.T.S.

VALVES AND PIPE SHOWN IN PAVING FOR CLARITY ONLY, ALL TO BE INSTALLED IN PLANTER.

DRIPLINE AND PVC HEADER

CONNECTION BETWEEN

PAVING SURROUNDING AND ADJACENT TO PLANTER AREA
TO THE PLANTER EDGE (PAVING) SHALL BE SPACED 4" FROM
NOT TO EXCEED SPACING ON THE LEGEND. ROWS ADJACENT

AS INDICATED ON THE LEGEND, ADJUST TO EVEN SPACING

DRIPLINE TUBING ROWS, SPACING APPROXIMATELY

SHOWN ON PLANS

EXTENDS TO LIMITS

DRIPLINE TUBING
PLANS FOR SIZE, 1" MINIMUM,

GRID OF DRIPLINE TUBING, SEE

PVC LATERAL LINE TO ADJACENT

END OF THE DRIP ZONE

HARDSCAPE EDGE OR THE
PVC HEADERS LOCATED 16" OFF

INSTALL ON DISCHARGE HEADER

FLUSH VALVE / INDICATOR HEAD,

SHOWN ON PLANS

EXTENDS TO LIMITS

DRIPLINE TUBING
MINIMUM SIZE, 12" BELOW GRADE
PVC SUPPLY HEADER, SEE PLANS, 1"
PLANS, 1" MINIMUM SIZE,

PVC DISCHARGE HEADER, SEE

FOR INSTALLATION

SEE PLANS AND DETAILS

DRIP CONTROL VALVE
F
1" MIN. SIZE, 12" BELOW GRADE

PVC SUPPLY HEADER, SEE PLANS,
12" BELOW GRADE
INSTALLED 12" BELOW GRADE

DRIPLINE AND PVC HEADER

CONNECTION BETWEEN
THE PAVING EDGE. ALL ROWS SHALL BE PARALLEL AND AT
THE SAME DEPTH.

PLANS FOR SIZE, 1" MINIMUM,

GRID OF DRIPLINE TUBING, SEE

PVC LATERAL LINE TO ADJACENT
INSTALLED 12" BELOW GRADE

DISCHARGE HEADER,END FEED SUPPLY HEADER, CENTER FEED SUPPLY HEADER, USE TEESUSE 90° ELBOWSUSE 90° ELBOW FITTINGS

FOR TUBING GRID

ACROSS PLANTED AREAS

DRIPLINE TUBING EXTEND

TUBING GRID (TYPICAL)

PLANTED AREAS FOR DRIPLINE

PVC HEADERS EXTEND ACROSS
Item 2B - Page 294
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Irrigation Details
N.T.S
L6.21

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN

QUICK COUPLER VALVEK MASTER CONTROL VALVEHFLOW SENSORIBALL VALVEJ SECTION VIEW - N.T.S.
2"
2" MIN.

FINISHED GRADE

IN SHRUB AREAS
2"

FINISH GRADE IN TURF AREAS
24" WIRE LOOPS AND

PVC MAINLINE TO FLOW
GPH GDBRY6 WATERPROOF

SENSOR, PIPE PER PLANS

WIRE CONNECTORS

LANDSCAPE FABRIC TO
3/4" CRUSHED GRAVEL,
4" MINIMUM DEPTH

COVER BOTTOM AND ALL

SIDES OF VALVE BOX

BRICK SUPPORTS,
FOUR (4) REQUIRED

ELECTRIC MASTER CONTROL

VALVE, SEE LEGEND FOR TYPE
MIN.

P
C

AND SPECIFICATIONS

WIRE PATH TO

CONTROLLER, IN CONDUIT
NOTE:

FLOW
USE STANDARD OPENINGS PROVIDED IN VALVE BOX FOR PIPE, DO NOT CUT BOX.

LASCO #896 PVC UNION

SLIP X MIPT, SIZE PER RCV,
2 REQUIRED FOR ASSEMBLY

PVC MAINLINE FROM

BACKFLOW DEVICE OR

BASKET STRAINER, USE
SCH 80 PVC 45° ELBOWS

TO ACHIEVE MAINLINE

DEPTH AS REQUIRED

PLASTIC RECTANGULAR VALVE BOX WITH T-COVER AND
CAPTIVE STAINLESS STEEL BOLT AND LOC-KIT. INSTALL
BOX AT RIGHT ANGLE TO ADJACENT HARDSCAPE EDGE.

HEAT BRAND "MCV" ONTO LID.

SECTION VIEW - N.T.S.
2" MIN.

FINISHED GRADE

IN SHRUB AREAS
2"

FINISH GRADE IN TURF AREAS
24" WIRE LOOPS AND
GPH GDBRY6 WATERPROOF

WIRE CONNECTORS

LANDSCAPE FABRIC TO
3/4" CRUSHED GRAVEL,
4" MINIMUM DEPTH

COVER BOTTOM AND ALL

SIDES OF VALVE BOX
BRICK SUPPORTS, 4 REQUIRED

FLOW SENSOR, SEE LEGEND

FOR BRAND, MODEL AND SIZE

WIRE PATH TO CONTROLLER
NOTE:

FLOW
4" MIN.
10 PIPE DIA.5 PIPE DIA.

USE STANDARD OPENINGS PROVIDED IN VALVE BOX FOR PIPE, DO NOT CUT BOX.

PVC MAINLINE TO THE
IRRIGATION SYSTEM.

USE SCH 80 PVC 45°

ELBOWS TO ACHIEVE

THE MAINLINE DEPTH

AS REQUIRED

PVC MAINLINE FROM MASTER CONTROL VALVE, NO FITTINGS

WITHIN UPSTREAM OR DOWNSTREAM OF THE SENSOR AS SHOWN

PLASTIC RECTANGULAR VALVE BOX WITH T-COVER AND
CAPTIVE STAINLESS STEEL BOLT AND LOC-KIT. INSTALL BOX
AT RIGHT ANGLE TO ADJACENT HARDSCAPE EDGE. HEAT
BRAND "FS" ONTO LID.

CL
LASCO "SLO-CLOSE" SCH. 80 PVC,

BRICK SUPPORTS,

FINISHED GRADE IN SHRUB AREAS

PVC IRRIGATION MAINLINE,
6" DIAMETER PVC CL. 160 PIPE,

ONE CUBIC FOOT OF
3/4" CRUSHED GRAVEL
6"
THREE (3) REQUIRED

TRU-UNION BALL VALVE, WITH PVC
LENGTH AS REQUIRED, 12" MINIMUM

SEE LEGEND FOR SPECIFICATION
SOCKET CONNECTIONS.

SOLVENT WELD PVC CONNECTIONS

SIZE PER MAINLINE SIZE
2"

FINISHED GRADE IN TURF AREAS
SECTION VIEW - N.T.S.

INSTALLED ON THE PROJECT.

NOTE:

PROVIDE ONE (1) 30" LONG STEEL "VALVE KEY" FOR EACH TEN (10) BALL VALVES PLASTIC 10" ROUND VALVE BOX WITH T-COVER AND
CAPTIVE STAINLESS STEEL BOLT AND LOCK-KIT. HEAT
BRAND "BV" ONTO LID.

SECTION VIEW - N.T.S.

USE A NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS.

CL
QUICK COUPLING VALVE WITH 1" FIPT INLET

FINISHED GRADE IN SHRUB AREAS
3"

THREADS AND A YELLOW VINYL LOCKING CAP
2"

LANDSCAPE FABRIC TO
3/4" CRUSHED GRAVEL, 4" MINIMUM DEPTH

COVER BOTTOM AND ALL

SIDES OF VALVE BOX

LASCO SNAP-LOK PVC SWING JOINT WITH
O-RINGS, A MALE 1" MIPT THREADED
LAY LENGTH AND SNAP-LOK COLLAR.

PVC INLET, PVC STABILIZER ELBOW, 12"

FINISHED GRADE IN TURF AREAS
BRICK SUPPORTS, THREE (3) REQUIRED
USE #G13S-218 WITH A 1" MIPT THREAD
REBAR STAKES, #3 X 24" LONG,
SCH. 80 PVC SST MAINLINE TEE FITTING,
MAINLINE SIZE X 1" FIPT FOR CONNECTION

TO THE SWING JOINT
TWO (2) REQUIRED
BRASS OUTLET.

WHEN USING A 3/4" QUICK COUPLER VALVE, USE A LASCO G13T-212 SWING JOINT WITH A 3/4" BRASS OUTLET FOR CONNECTION TO THE QCV INLET. ALL OTHER PARTS OF SWING JOINT SHALL REMAIN 1" SIZE.

COLORED T-COVER AND CAPTIVE STAINLESS
PLASTIC 10" ROUND VALVE BOX WITH BLACK
STEEL BOLT ANDLOCK-KIT. HEAT BRAND "QCV"
ONTO LID.

NOTE:

WHEN QCV IS LOCATED ON A MANIFOLD, USE A SCH. 80 SxT 90° ELBOW IN PLACE OF THE TEE FITTING.

SIZE THE ELBOW AS MANIFOLD MAINLINE SIZE X 1" FIPT.

COMBINED REMOTE CONTROL VALVE ASSEMBLY W / QCVN

BOTTOM OF RAIN BIRD STANDARD VALVE BOX

RAIN BIRD VB SERIES STANDARD VALVE BOX

TOP OF RAIN BIRD STANDARD VALVE BOX
1" SLIP OR
1 1/4" SPIGOT
1" SCH 40 PVC MAINLINE PIPE
1" SCH 80 PVC MALE ADAPTER, SOCKET X MIPT
LASCO END CAP # 1348-010
ENTIRE VALVE BOX BOTTOM AND SIDES TO BE WRAPPED WITH LANDSCAPE FABRIC.

INSTALL A 4" DEEP LAYER OF 3/4" CRUSHED GRAVEL IN THE BOTTOM OF THE VALVE BOX.

USE LASCO ULTRAZONE DOUBLE TEE (#1301210), TRIPLE TEE (#1301310), OR QUAD TEE (#1301410) UNITS FOR USE THIS ASSEMBLY FOR ANY GROUP OF TWO (2), THREE (3) OR FOUR (4) 1" REMOTE CONTROL VALVES, NOTE:

USE STANDARD BOX OPENINGS FOR ALL PIPING INTO THE BOX, DO NOT CUT THE BOX.

DO NOT USE TEFLON PASTE ON THE VALVE CONNECTIONS TO THE LASCO ULTRA ZONE MANIFOLD CONNECTIONS. 1" SCH 80 PVC FEMALE ADAPTER, SOCKET X FIPT
ASSEMBLIES AS NEEDED. CAP UNUSED OUTLETS ON MANIFOLD TEES.

FLOW
FLOW
FLOW
FLOW

FLOW FLOW
1" LASCO #896 SLIP X MPT SCH 80 PVC UNION FITTING
2 1
3 4
5 6
7 8
9 10
11 12
13 14
15 6 78 910
1 1
2 3
5 5 5
7 11
12 13
14 15
5 4 44
FLOW
FLOW
1" SLIP OR
1 1/4" SPIGOT
17 16
4 17
16 16
17 3
4 4
17 18
19 18
19 18
19 3
22 2
16 2
18 OR FOR GROUPS OF TWO (2) OR THREE (3) 1" REMOTE CONTROL VALVES AND A 3/4" QUICK COUPLER VALVE. 1" REMOTE CONTROL VALVE, FIPT ON

BOTH ENDS, SEE LEGEND

TELESCOPING VALVE ADAPTER, LASCO MODEL
#1336-010, FOR USE WITH FIPT VALVES
LATERAL LINE, 1" OR 1 1/4" PVC PIPE, SEE LEGEND FOR
TYPE. FOR 1 1/4" LATERAL LINE INSTALL A 1 1/4" SCH. 40

SLIP COUPLING ONTO THE END OF THE ADAPTER
QUAD MANIFOLD TEE, (NUT x MTHD x MVConn), LASCO
MODEL #1301-410, FOR USE WITH FIPT VALVES
MAINLINE SIZE SCH 80 PVC SLIP 90° ELBOW WITH A SCH 40
PVC REDUCER BUSHING TO REDUCE TO 1" SIZE PIPE
USE ONE (1) OF THREE (3) STANDARD OPENINGS ON THE SHORT SIDE OF

THE RAIN BIRD VALVE BOX FOR THE MAINLINE INTO THE VALVE BOX FOUR (4) STANDARD OPENINGS ON THE LONG SIDE OF THE RAIN BIRD

VALVE BOX FOR LATERAL LINES OUT OF THE VALVE BOX
QCV ASSEMBLY: TWO (2) 1" SCH 80 PVC THD. 90° ELLS, ONE (1) 1" X 4" SCH 80 THD. NIPPLE, ONE (1) 1" X 3/4" PVC THD. REDUCER BUSHING, ONE (1) 3/4" X 3" SCH 80 PVC THD. NIPPLE, ONE (1) 3/4" BRASS THD. 90° ELBOW, ONE (1) #3 X 24" REBAR STAKE, AND TWO (2) S.S. HOSE CLAMPS

TELESCOPING VALVE ADAPTER, LASCO MODEL
#1236-010, FOR USE WITH MIPT FILTER
1" PRESSURE REGULATING BASKET FILTER,

MIPT ON BOTH ENDS, SEE LEGEND
3/4" QUICK COUPLER VALVE, TOP OF QCV TO BE 1"

BELOW BOTTOM OF THE VALVE BOX LID

REMOTE CONTROL VALVELDRIP REMOTE CONTROL VALVEM
USE AN APPROVED, NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS.

USE STANDARD BOX OPENINGS FOR ALL PIPING INTO THE BOX, DO NOT CUT THE BOX. 2"
2" MIN.

FINISHED GRADE IN SHRUB AREAS2"

BRICK SUPPORTS,
FOUR (4) REQUIRED
LASCO #1336-010 TELESCOPING

VALVE ADAPTER, SIZE PER RCV,
MIN.

P
C
3/4" CRUSHED GRAVEL,
4" MINIMUM DEPTH
SCH. 80 PVC 90° ELL FITTING*

LANDSCAPE FABRIC TO

COVER BOTTOM AND ALL

SIDES OF VALVE BOX

ELECTRIC REMOTE CONTROL

VALVE, SEE LEGEND FOR TYPE

TAPE WIRES TO RISER USING

BLACK ELECTRICAL TAPE

FINISHED GRADE IN TURF AREAS

LATERAL LINE, SIZE

PER PLANS, TYPE

PVC PIPE, AS
24" WIRE LOOPS AND
GPH GDBRY6 WATERPROOF

WIRE CONNECTORS
SCH. 80 PVC TEE OR 90° ELL

FITTING ON MAINLINE,
ID

VALVE NUMBER ID TAG,
CHRISTY'S MODEL ID-STD-Y1
NOTE:

PER LEGEND

MAINLINE SIZE X RCV X RCV (TEE)

OR MAINLINE SIZE X RCV (ELL)
SECTION VIEW - N.T.S.

PLASTIC RECTANGULAR VALVE BOX WITH T-COVER AND
CAPTIVE STAINLESS STEEL BOLT AND LOC-KIT. INSTALL
BOX AT RIGHT ANGLE TO ADJACENT HARDSCAPE EDGE.

HEAT BRAND "RCV" AND CONTROL STATION # ONTO LID.
* ABOVE INDICATES 1" X

MAINLINE SIZE

PVC MAINLINE PIPE RISER, SIZE

PER PLAN, LENGTH AS REQUIRED
LASCO MODEL # 1301-410
QUAD MANIFOLD TEE 1" SIZE
NOTE:

USE STANDARD BOX OPENINGS FOR ALL PIPING INTO THE BOX, DO NOT CUT THE BOX.

USE AN APPROVED, NON-HARDENING, TEFLON ASSEMBLY PASTE ON ALL THREADED FITTINGS.

SECTION VIEW - N.T.S.
2"
2" MIN.

FINISHED GRADE IN SHRUB AREAS2"

BRICK SUPPORTS,
FOUR (4) REQUIRED
MIN.

P
C
3/4" CRUSHED GRAVEL,
4" MINIMUM DEPTH
SCH. 80 PVC 90° ELL FITTING*

LANDSCAPE FABRIC TO

COVER BOTTOM AND ALL

SIDES OF VALVE BOX

ELECTRIC REMOTE CONTROL

VALVE, SEE LEGEND FOR TYPE

TAPE WIRES TO RISER USING

BLACK ELECTRICAL TAPE

FINISHED GRADE IN TURF AREAS

LATERAL LINE, SIZE

PER PLANS, TYPE

PVC PIPE, AS
24" WIRE LOOPS AND
GPH GDBRY6 WATERPROOF

WIRE CONNECTORS
SCH. 80 PVC TEE OR 90° ELL

FITTING ON MAINLINE,
ID

VALVE NUMBER ID TAG,
CHRISTY'S MODEL ID-STD-Y1

PER LEGEND

MAINLINE SIZE X RCV X RCV (TEE)

OR MAINLINE SIZE X RCV (ELL)

PLASTIC RECTANGULAR VALVE BOX WITH T-COVER AND
CAPTIVE STAINLESS STEEL BOLT AND LOC-KIT. INSTALL
BOX AT RIGHT ANGLE TO ADJACENT HARDSCAPE EDGE.

HEAT BRAND "RCV" AND CONTROL STATION # ONTO LID.
* ABOVE INDICATES 1" X

MAINLINE SIZE

PVC MAINLINE PIPE RISER, SIZE

PER PLAN, LENGTH AS REQUIRED
LASCO MODEL # 1301-410
QUAD MANIFOLD TEE 1" SIZE

PRESSURE REGULATING BASKET FILTER, SEE LEGEND
LASCO #1336-010

TELESCOPING VALVE

ADAPTER, SIZE PER RCV
Item 2B - Page 295
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
January 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com
Irrigation Details
N.T.S
L6.22

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION

GUIDELINES AND APPLIED THEM ACCORDINGLY FOR THE

EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN

OPIPE INSTALLATIONQSLEEVE INSTALLATIONR

VALVE BOX LAYOUTT
12"12"12"
REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT.

5. BOX LOCATIONS SHALL BE STAKED IN THE FIELD PRIOR TO MAINLINE INSTALLATION FOR

QCV BOX, TYPICAL
18"
12"
BE INSTALLED IN TURF AREAS WITHOUT PRIOR APPROVAL BY THE LANDSCAPE ARCHITECT.

NOTE:

VALVE BOXES SHALL BE INSTALLED IN SHRUB AND GROUND COVER AREAS. NO VALVES SHALL

ALIGN BOX EDGES

VALVE BOX, TYPICAL BALL VALVE BOX, TYPICAL

EDGE OF TURF, WALKWAY, DRIVEWAY OR PAVING
18"
COLLAPSE AND / OR DEFORMATION OF VALVE BOXES.

4. AVOID HEAVILY COMPACTING SOIL AROUND VALVE BOXES TO PREVENT THE EVER POSSIBLE, VALVES IN TURF AREAS TO BE APPROVED BY LANDSCAPE ARCHITECT.

2. SET RCV AND VALVE BOX ASSEMBLY IN GROUND COVER OR SHRUB AREAS WHERE FACILITATE SERVICING OF THE VALVE OR EQUIPMENT.

1. CENTER VALVE BOX OVER REMOTE CONTROL VALVE OR DRIP ASSEMBLY TO

3. SET BOXES PARALLEL TO EACH OTHER AND PERPENDICULAR TO ADJACENT PAVING EDGE.

NOTE:

PLAN VIEW - N.T.S.

QCV
RCV
A13
RCV
A15
RCV
A14
BV

RAIN SENSORP
SECTION VIEW - N.T.S.

VERIFY THE SENSOR LOCATION WITH THE OWNER AND/OR ARCHITECT PRIOR TO INSTALLATION.

ADJUST SENSOR LOCATION AS NECESSARY.

VERIFY THE ROUTING OF THE WIRES AND CONDUIT ON WIRED SENSORS PRIOR TO INSTALLATION.

NOTE:

SEE LEGEND FOR

WIRED RAIN SENSOR, WIRED

MODEL AND TYPE TO BE USED

WIRES FOR WIRED MODEL
FASCIA, WALL OR POST AS REQUIRED.

ATTACH MOUNTING BRACKET TO
USE TWO (2) SCREWS OR BOLTS

BRACKET, AS SUPPLIED WITH

HINGED ALUMINUM MOUNTING

SENSOR, SEE LEGEND

SWEEPS TO ROUTE WIRES FROM THE
1/2" STEEL ELECTRICAL CONDUIT AND

SENSOR TO THE CONTROLLER (WIRED
MODELS). SECURE TO THE WALL WITH
CONDUIT SUPPORTS. PAINT CONDUIT
TO MATCH WALL OR BUILDING.

LOCATE THE SENSOR PER THE DRAWINGS AND IN AN AREA THAT WILL RECEIVE DIRECT RAINFALL.

SEAL END OF CONDUIT WITH SILICONE

WIRE CONNECTIONS
SECTION VIEW - N.T.S.

KIT SHALL INCLUDE A SCOTCHLOK SPRING CONNECTOR, A POLYPROPYLENE TUBE AND A 100% SILICONE WATERPROOF SEALING GEL. TUBE SHALL BE SUPPLIED PRE-FILLED WITH GEL.

WIRE CONNECTOR SHALL BE A GPH IRRIGATION GDBRY6 DIRECT BURY SPLICE KIT.

NOTE:

INSERTED INTO TUBE UNTIL THE

SCOTCHLOK CONNECTOR AND WIRES

CONNECTOR PASSES LOCK TABS

SILICONE WATERPROOF GEL
POLY TUBE PRE-FILLED WITH 100%

ONCE CONNECTOR IS INSERTED

LOCK TABS PREVENT WIRE REMOVAL

SCOTCHLOK ELECTRICAL SPRING
CONNECTOR. WIRES SHALL BE
PRE-STRIPPED OF 1/2" OF THE

INSULATION PRIOR TO INSERTION

CONNECTOR ONTO WIRES TO
INTO THE CONNECTIOR. TWIST
SEAT FIRMLY.

IS INSERTED INTO TUBE

WIRES PASS THROUGH GROOVES IN

TUBE LID TO ALLOW LID TO CLOSE

CLOSE TUBE LID AFTER WIRE
LOW VOLTAGE WIRES, 3 MAXIMUM
WALL MOUNTED CONT. ASSEMBLY
SECTION VIEW - N.T.S.

IN RIGID 1/2" CONDUIT (PAINT TO MATCH WALL)

TO RAIN SENSOR MOUNTED ON EVE OF ROOF
FOR MCV AND RCV WIRES.

LOW VOLTAGE WIRE IN RIGID PVC CONDUIT (2")
RIGID ELECTRICAL CONDUIT (1")
FOR SPECIFICATION.

CONTROLLER, SEE LEGEND

IF SPECIFIED

WALL MOUNTED ENCLOSURE

IN J-BOX, BY OTHERS
120 VOLT POWER SUPPLY

CONDUIT TO END BELOW FINISHED SURFACE

FINISHED GRADE
NOTE:
48"

FOR FLOW SENSOR WIRES, ROUTE CONDUIT BACK
LOW VOLTAGE WIRE IN RIGID PVC CONDUIT (1/2")

TO FLOW SENSOR LOCATION

CONTROL WIRES TO BE DIRECT BURIAL

PVC ELECTRICAL SWEEPS, TYPICAL
ROUTE 1/2" CONDUIT TO FLOW SENSOR
VALVE BOX LOCATION.

INSTALL ENCLOSURE AS INDICATED BY CITY STAFF & MANUFACTURER'S RECOMMENDATION.

ROUTE 1" CONDUIT TO GROUNDING ROD
VALVE BOX LOCATION.
(1") CONDUIT FOR GROUNDING WIRE
BARE #6 COPPER GROUND WIRE IN RIGID PVC
SECTION VIEW - N.T.S.

SIZES 3" AND 4"
SIZES 3/4" TO 2 1/2"

PIPE SIZESA

FINISH SOIL GRADE
ABC
DDDD
D

IRRIGATION NON-PRESSURE LATERAL LINE

IRRIGATION PRESSURE MAINLINE

LOW VOLTAGE CONTROL WIRES,

IN CONDUIT IF SPECIFIED ON LEGEND

UNDISTURBED SITE SOIL

CLEAN, COMPACTED BACKFILL SOIL,

CLEAN SOIL PIPE BEDDING, SEE CHART

SEPARATION BETWEEN PIPES AND

TRENCH WALLS, SEE CHART
12"
18"
B
18"
24"
C
18"
24"
D
4"
4"
SIZES 6" AND LARGER30" 24" 6"

SEE SPECIFICATIONS
CONTRACTOR IS REQUIRED TO CONTACT 811 OR DIGALERT A MINIMUM OF TWO (2) DAYS PRIOR TO ANY EXCAVATION ON THE PROJECT. DIAL 811 OR LOG ONTO WWW.DIGALERT.ORG.

NOTE:

SECTION VIEW - N.T.S.

UNDER PEDESTRIAN PAVING

PIPE SIZESA

PAVING, SEE SITE PLANS
ABC
DDDD
D

IRRIGATION LATERAL LINE IN SLEEVE

IRRIGATION MAINLINE IN SLEEVE

LOW VOLTAGE CONTROL WIRES,

OR CONDUIT, IN SLEEVE

UNDISTURBED SITE SOIL

SAND BACKFILL COMPACTED TO

CLEAN SOIL PIPE BEDDING, SEE CHART

SEPARATION BETWEEN PIPES AND

TRENCH WALLS, SEE CHART
12"
B
24"
C
24"
D
4"
UNDER VEHICULAR PAVING36" 36" 6"

EQUAL DENSITY OF EXISTING SOIL

OR PAVING BASE MATERIAL
24"

SLEEVES SHALL BE TWICE THE DIAMETER OF THE PIPE OR WIRE BUNDLE CARRIED WITHIN, EXCEPT WHEN SLEEVES SHALL EXTEND 12" PAST THE EDGE OF PAVING INTO THE PLANTER.

USING BELL AND GASKET PIPING WHERE MAINLINE SLEEVES SHALL BE 2.5 TIMES THE SIZE OF THE PIPE.

CONTRACTOR IS REQUIRED TO CONTACT 811 OR DIGALERT A MINIMUM OF TWO (2) DAYS PRIOR TO ANY EXCAVATION ON THE PROJECT. DIAL 811 OR LOG ONTO WWW.DIGALERT.ORG.

NOTE:

Item 2B - Page 296

TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
ARE ROM ARECASTRUM ROMANZOFFIANUMQUEEN PALM20`–25` H 25 CHI LIN CHILOPSIS LINEARISDESERT WILLOW60" BOX30
KOE BIP KOELREUTERIA BIPINNATACHINESE FLAME TREE60" BOX10 PAR PRA PARKINSONIA PRAECOXPALO BREA60" BOX20
PAR DES PARKINSONIA X `DESERT MUSEUM` DESERT MUSEUM PALO VERDE 60" BOX32 PHO DAC PHOENIX DACTYLIFERADATE PALM20`–25` H7
PRO THL PROSOPIS CHILENSIS `THORNLESS`THORNLESS CHILEAN MESQUITE60" BOX27 WAS FIL WASHINGTONIA FILIFERACALIFORNIA FAN PALM20`–25` H 76

TREE SCHEDULE

SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING
ASC SUB ASCLEPIAS SUBULATADESERT MILKWEED10 GAL24" o.c.

CAL CAL CALLIANDRA CALIFORNICABAJA FAIRY DUSTER10 GAL24" o.c.

DAL DAL DALEA CAPITATADALEA10 GAL24" o.c.

DAS WHE DASYLIRION WHEELERIDESERT SPOON15 GAL36" o.c.

ECH GRU ECHINOCACTUS GRUSONIIGOLDEN BARREL CACTUS15 GAL12" o.c. 108 ENC FAR ENCELIA FARINOSABRITTLE BUSH10 GAL24" o.c. 13
ERI TURERICAMERIA LARICIFOLIATURPENTINE BUSH10 GAL24" o.c.

ESC CAL ESCHSCHOLZIA CALIFORNICACALIFORNIA POPPY10 GAL24" o.c.

EUP RIG EUPHORBIA RIGIDAGOPHER PLANT10 GAL24" o.c. 18
FOU SPLFOUQUIERIA SPLENDENSOCOTILLO15 GAL48" o.c. 19
HES PAR HESPERALOE PARVIFLORARED YUCCA15 GAL18" o.c.

HYP EMO HYPTIS EMORYIDESERT LAVENDER10 GAL24" o.c. 13
IMP RU2IMPERATA CYLINDRICA `RUBRA`JAPANESE BLOOD GRASS10 GAL24" o.c.

JUS CAL JUSTICIA CALIFORNICACHUPAROSA10 GAL24" o.c.

LAR TRI LARREA TRIDENTATACREOSOTE BUSH10 GAL24" o.c. 160 LEU THULEUCOPHYLLUM CANDIDUM `THUNDER CLOUD` TM THUNDER CLOUD TEXAS SAGE10 GAL24" o.c.

LEU LAELEUCOPHYLLUM LAEVIGATUMCHIHUAHUAN RAIN SAGE10 GAL 24" o.c. 109 MUH AUTMUHLENBERGIA LINDHEIMERI `AUTUMN GLOW` TM LINDHEIMER`S MUHLY10 GAL 24" o.c.

OEN STU OENOTHERA STUBBEICHIHUAHUAN PRIMROSE10 GAL24" o.c.

OPU EL7 OPUNTIA CACANAPA `ELLISIANA`SPINELESS PRICKLY PEAR15 GAL36" o.c.

PAC MAR PACHYCEREUS MARGINATUSMEXICAN FENCEPOST15 GAL48" o.c.

SAL API SALVIA APIANAWHITE SAGE10 GAL24" o.c.

SEN ART SENNA ARTEMISIOIDESFEATHERY SENNA10 GAL24" o.c.

TEC ORA TECOMA X `ORANGE JUBILEE`ORANGE JUBILEE YELLOW TRUMPET FLOWER 15 GAL24" o.c.

YUC RIG YUCCA RIGIDABLUE YUCCA15 GAL36" o.c. 10

PLANT SCHEDULE
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Planting Notes &
Schedule
N.T.S.

L7.00
GENERAL NOTES:

1. THE CONTRACTOR SHALL REVIEW ALL UTILITY PLANS AND UTILITY LOCATIONS IN THE FIELD AND SHALL NOTIFY THE LANDSCAPE ARCHITECT IF CONFLICTS WITH PLANT MATERIAL LOCATIONS EXIST.

2. THE CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS TO ENSURE THERE ARE NO CONFLICTS IN FINAL PLACEMENT AND/OR PLACEMENT SEQUENCE AND STAGING OF ANY PLANT MATERIAL AS A RESULT OF OTHER SITE ELEMENTS, WALLS, UNDERGROUND STRUCTURES, OVERHEAD STRUCTURES, AND CONSTRUCTION ACTIVITIES. CONTRACTOR TO NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IF CONFLICT(S) ARISE.

3. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO SELECT AND TAG ALL TREES IN NURSERY PRIOR TO APPROVAL. ALL TAGGED TREES TO BEAR LANDSCAPE ARCHITECTS NUMBERED TAMPER-PROOF TAGS ON BOX OR CONTAINER. CONTRACTOR SHALL SUBMIT FOR APPROVAL PHOTOS OF EACH TAGGED, WITH EACH SUBMITTAL ENTRY CORRESPONDING TO TAG NUMBERS. SUBMITTAL ENTRIES TO CLEARLY INDICATE WHICH SIDE OF THE TREE WAS ORIENTED TOWARDS NORTH IN NURSERY.

4. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL PHOTOS OF ONE REPRESENTATIVE EXAMPLE OF EACH PLANT SELECTION. PHOTOS TO INCLUDE A PERSON OR MEASURING TAPE FOR SCALE PURPOSES.

DELIVERED PLANTS TO MEET OR EXCEED THE QUALITY OF THIS REPRESENTATIVE SUBMITTAL.

5. ANY PLANT DEEMED NOT AVAILABLE BY THE CONTRACTOR SHALL BE NOTED IN THE BID AS A CONDITION OF THE BID. FAILURE TO QUALIFY AVAILABILITY OF SPECIFIED MATERIAL AS SPECIFIED SHALL MAKE THE CONTRACTOR RESPONSIBLE FOR SUPPLYING ALL MATERIALS. LANDSCAPE ARCHITECT RESERVES THE RIGHT TO CHANGE PLANT SPECIES, VARIETY, SPACING, AND/OR QUANTITY OF ANY PLANT MATERIAL THAT DOES NOT MEET EXACT SPECIFICATIONS, UNLESS UNAVAILABILITY OF SPECIFIED MATERIAL IS INDICATED AS A CONDITION OF BID . CONTRACTOR MAY ISSUE A PRE-BID RFI (IF PERMISSIBLE WITHIN BIDDING PROCEDURES) TO QUALIFY AN ALTERNATE.

6. THE MAINTENANCE PERIOD MAY NOT BEGIN UNTIL ALL IRRIGATION SYSTEMS ARE OPERATIONAL, ALL SPECIFIED MATERIALS ARE INSTALLED AND ACCEPTED BY LANDSCAPE ARCHITECT, AND AS-BUILT DRAWINGS ARE PROVIDED BY CONTRACTOR PER SPECIFICATIONS.

7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FURNISH PLANT MATERIALS FREE OF PESTS OR PLANT DISEASES. PRE-SELECTED OR TAGGED MATERIAL MUST BE INSPECTED BY THE CONTRACTOR AND CERTIFIED PEST AND DISEASE FREE. IT IS THE CONTRACTOR'S OBLIGATION TO WARRANTY ALL PLANT MATERIALS PER THE SPECIFICATIONS.

8. ALL PLANT MATERIAL SHALL BE APPROVED ON SITE BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.

9. FINAL LOCATION OF ALL PLANT MATERIAL SHALL BE APPROVED ON SITE BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.

10. ALL OVER-EXCAVATION REQUIRED TO MEET PLANTING SPECIFICATIONS SHALL BE DONE PRIOR TO PAVING IF PAVING WILL CONFLICT WITH EXCAVATION OF PLANTING PITS.

11. SEE SPECIFICATIONS FOR PLANTING REQUIREMENTS, MATERIALS, AND EXECUTION.

12. SEE SPECIFICATIONS FOR STAKING AND GUYING METHODS.

13. MULTI-TRUNK INDICATES (3) TRUNKS MIN., BRANCHED FROM BASE OF TREE.

14. ALL GROUND COVERS SHALL BE APPLIED IN ALL PLANTING AREAS INDICATED ON PLANS, AS WELL AS UNDER SHRUBS. GROUND COVER KEY INDICATIONS ARE SHOWN IN THE LEGEND.

15. GROUNDCOVERS SHALL BE TRIANGULARLY SPACED, UNLESS OTHERWISE INDICATED.

16. ALL PLANTED AREAS SHALL BE COVERED WITH 3" DEEP ORGANIC MULCH UNLESS OTHERWISE NOTED. SEE SPECIFICATIONS FOR MATERIAL REQUIREMENTS. SUBMIT 1 CU. FT. SAMPLE PRIOR TO APPLICATION.

17. A MINIMUM OF TWO (2) SOIL SAMPLES SHALL BE TAKEN BY THE CONTRACTOR AFTER GRADING OPERATIONS ARE COMPLETED FOR SOIL FERTILITY AND AGRICULTURAL SUITABILITY TESTING AND RECOMMENDATIONS. APPROVED LABORATORIES ARE SOIL AND PLANT LABS (714) 282-8777 OR WALLACE LAB (310) 615-0116. SEE SPECIFICATIONS FOR SOIL AMENDMENTS; THESE ARE SPECIFIED FOR BIDDING PURPOSES ONLY. PROVIDE LANDSCAPE ARCHITECT WITH SOILS REPORT PRIOR TO INSTALLATION OF MATERIALS.

18. SOIL DEEMED NOT AVAILABLE PER LANDSCAPE ARCHITECT'S SPECIFICATIONS SHOULD BE NOTED AS CONDITION OF THE BID. FAILURE TO QUALIFY THE AVAILABILITY OF SOIL PER SPECIFICATIONS SHALL MAKE THE CONTRACTOR RESPONSIBLE FOR SUPPLYING THE SPECIFIED SOIL.

19. FOR PROJECTS WHERE SOIL IS PLACED ON SUSPENDED SLAB OR OTHERWISE ON STRUCTURE, SOIL NOT TO EXCEED MAXIMUM SATURATION DENSITY IN POUNDS PER CUBIC FEET AS SPECIFIED IN SPECIFICATIONS. CONTRACTOR TO SUBMIT TESTING FOR APPROVAL BY STRUCTURAL ENGINEER OF RECORD.

20. ALL PLANT MATERIALS WITHIN THE RIGHT OF WAY SHALL BE PLANTED TO CONFORM TO GOVERNING AGENCY STANDARDS. ALL PLANTING IN PUBLIC RIGHT OF WAY TO RECEIVE PERMITS FROM APPROPRIATE PUBLIC WORKS PERMITTING AGENCIES.

21. PLANT QUANTITIES AS NOTED ON THE PLANS ARE FOR THE CONVENIENCE OF THE CONTRACTOR. LANDSCAPE ARCHITECT DOES NOT TAKE RESPONSIBILITY FOR THE ACCURACY OF THESE QUANTITIES AS NOTED ON THIS SCHEDULE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL PLANTS AS REQUIRED TO MEET ON-CENTER SPACING AS NOTED IN THE PLANT SCHEDULE AND/OR TOTAL COUNT AS REQUIRED PER PLANTING PLANS.

22. CONTRACTOR IS RESPONSIBLE FOR PROCURING ALL PLANTS PER SPECIFICATIONS CRITERIA, INCLUDING BUT NOT LIMITED TO CONTAINER SIZE, WIDTH, HEIGHT, SPREAD, CANOPY WIDTH AND HEIGHT, OR ANY OTHER PHYSICAL CHARACTERISTICS SPECIFIED UNDER COMMENTS IN THIS SCHEDULE.

23. PLANT MATERIAL SHALL BE GUARANTEED TO BE AVAILABLE AND MEET OR EXCEED REQUIRED SPECIFICATIONS ON ESTIMATED DATE OF START OF PLANTING.

24. A MINIMUM 3-INCH LAYER OF MULCH SHALL BE APPLIED ON ALL EXPOSED SOIL SURFACES OF PLANTING AREAS EXCEPT TURF AREAS, CREEPING OR ROOTING GROUNDCOVERS, OR DIRECT SEEDING APPLICATIONS WHERE MULCH IS CONTRAINDICATED. APPLY MULCH PER SPECIFICATIONS. LEAVE 2" SPACE WITHOUT MULCH AROUND THE BASE OF TREE TRUNKS, AND 1" SPACE AROUND SHRUBS. DO NOT COVER SHRUBS WITH MULCH. SEE SPECIFICATIONS FOR MATERIAL REQUIREMENTS. SUBMIT 1 CU. FT. SAMPLE PRIOR TO APPLICATION.

25. FOR SOILS LESS THAN 6% ORGANIC MATTER IN THE TOP 6 INCHES OF SOIL, COMPOST AT A RATE OF A MINIMUM OF FOUR CUBIC YARDS PER 1,000 SQUARE FEET OF PERMEABLE AREA SHALL BE INCORPORATED TO A DEPTH OF SIX INCHES INTO THE SOIL.

26. ALL PLANTING TO COMPLY WITH GREEN BUILDING CODE, MWELO REQUIREMENTS, AND WHERE APPLICABLE CALFIRE DEFENSIBLE SPACE REQUIREMENTS PER CALIFORNIA PUBLIC RESOURCES CODE 4291.

27.NO TREE(S) MAY BE REMOVED, MOVED, PRUNED, ROOT PRUNED, OR OTHERWISE ALTERED OR DAMAGED WITHOUT EXPLICIT APPROVAL FROM LANDSCAPE ARCHITECT AND/OR PER DEMOLITION PLANS. THE TERM "REMOVED" SHALL INCLUDE ANY ACT THAT WILL CAUSE A TREE TO DIE, INCLUDING BUT NOT LIMITED TO ACTS THAT INFLICT DAMAGE UPON THE ROOT SYSTEM OR OTHER PARTS OF THE TREE BY FIRE, APPLICATION OF

TOXIC SUBSTANCES, OPERATION OF EQUIPMENT OR MACHINERY, CHANGING THE NATURAL GRADE OF LAND BY EXCAVATION OR FILLING WITHIN THE DRIP LINE AREA AROUND THE TRUNK, COMPACTION WITHIN THE DRIP LINE AREA, FLOODING OR CHANGE IN WATER TABLE AS A RESULT OF CONSTRUCTION ACTIVITY, DUMPING AND STAGING OF MATERIAL AND/OR EQUIPMENT WITHIN THE DRIP LINE AREA. SEE TREE PROTECTION NOTES BELOW.

SHRUB PLANTING NOTES:

1. DIG PLANTING HOLE AT LEAST 2X THE WIDTH OF THE ROOT BALL OR CONTAINER.

2. SCARIFY SUBGRADE AND SIDES OF PLANTING HOLE WHEN PLANTING IN CLAY SOIL.

3. SET THE TOP OF THE ROOT BALL LEVEL WITH THE SOIL SURFACE, OR 1-2" ABOVE IF THE SOIL IS PRONE TO SETTLING.

4. IF CONTAINER GROWN PLANT, GENTLY SLIDE PLANT OUT OF CONTAINER. DISTURB THE ROOTS.

5. IF B&B PLANT, REMOVE BURLAP FROM AT LEAST THE TOP 12 INCHES OF THE ROOTBALL, WITHOUT DISTURBING THE ROOTBALL. REMOVE ALL CORD FROM THE TRUNK. REMOVE BURLAP AND WIRE

1. BASKET (IF PRESENT) FROM THE ROOT BALL.

6. BACK FILL THE PLANTING HOLE WITH EXCAVATED NATIVE SOIL, BROKEN UP OR TILLED. WATER TO REMOVE AIR POCKETS. DO NOT ADD AMENDMENTS.

7. PLACE APPROVED MULCH ON THE SURFACE TO A (SETTLED) DEPTH OF 1 TO 3 INCHES PER SPECIFICATIONS.

Item 2B - Page 297

UP UP UP
UP
UP UP

UP UP UP UP
UP
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CALKING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CALKING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
ATTEMP
1 L7.12
1 L7.23
1 L7.10
1 L7.21
1 L7.11
1 L7.20
1 L7.22
1 L7.13
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Overall Planting
Plan
########
L7.01
Overall Planting
Plan
1" = 20'
L7.01
Item 2B - Page 298
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
CAL
KING72X84
ATTEMP
PARKINSONIA X 'DESERT MUSEUM', TYP.
25' DIAMETER CANOPY @ 15 YEARS
KOELREUTERIA BIPINNATA, TYP.
30' DIAMETER CANOPY @ 15 YEARS
PROSOPIS CHILENSIS 'THORNLESS, TYP.
30' DIAMETER CANOPY @ 15 YEARS
P1
P4
P9
P2 P3
P5 P6 P8 P7
P10
P11
P12
P13
P14
P15
P16
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Parking Lot
Shading Exhibit
1" = 20'
L7.02

PARKING LOT SHADING CALCULATIONS
TOTAL NUMBER OF PARKING STALLS: 16
TOTAL NUMBER OF TREE SHADED PARKING STALLS: 8
REQUIRED PERCENTAGE OF TOTAL PARKING AREA TO BE SHADED: 30% PROVIDED PERCENTAGE OF TOTAL SHADED PARKING AREA: 50%
Item 2B - Page 299

TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
ARE ROM ARECASTRUM ROMANZOFFIANUMQUEEN PALM20`–25` H11
CHI LIN CHILOPSIS LINEARISDESERT WILLOW60" BOX 12
KOE BIP KOELREUTERIA BIPINNATACHINESE FLAME TREE60" BOX3 PAR PRA PARKINSONIA PRAECOXPALO BREA60" BOX8
PAR DES PARKINSONIA X `DESERT MUSEUM` DESERT MUSEUM PALO VERDE 60" BOX6 PHO DAC PHOENIX DACTYLIFERADATE PALM20`–25` H 3
PRO THL PROSOPIS CHILENSIS `THORNLESS`THORNLESS CHILEAN MESQUITE60" BOX 12 WAS FIL WASHINGTONIA FILIFERACALIFORNIA FAN PALM20`–25` H17

TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Tree Plan A
1/8" = 1'-0"
L7.10
Item 2B - Page 300

TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
ARE ROM ARECASTRUM ROMANZOFFIANUMQUEEN PALM20`–25` H 9
KOE BIP KOELREUTERIA BIPINNATACHINESE FLAME TREE60" BOX5 PAR PRA PARKINSONIA PRAECOXPALO BREA60" BOX 2
PAR DES PARKINSONIA X `DESERT MUSEUM` DESERT MUSEUM PALO VERDE 60" BOX6

TREE SCHEDULE B
PHO DAC PHOENIX DACTYLIFERADATE PALM20`–25` H2
PRO THL PROSOPIS CHILENSIS `THORNLESS`THORNLESS CHILEAN MESQUITE60" BOX 4 WAS FIL WASHINGTONIA FILIFERACALIFORNIA FAN PALM20`–25` H22

TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Tree Plan B
1/8" = 1'-0"
L7.11
Item 2B - Page 301

TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
ARE ROM ARECASTRUM ROMANZOFFIANUMQUEEN PALM20`–25` H 13 CHI LIN CHILOPSIS LINEARISDESERT WILLOW60" BOX13
KOE BIP KOELREUTERIA BIPINNATACHINESE FLAME TREE60" BOX 1 PAR PRA PARKINSONIA PRAECOXPALO BREA60" BOX 11

TREE SCHEDULE C
PAR DES PARKINSONIA X `DESERT MUSEUM` DESERT MUSEUM PALO VERDE 60" BOX10 PHO DAC PHOENIX DACTYLIFERADATE PALM20`–25` H1
PRO THL PROSOPIS CHILENSIS `THORNLESS`THORNLESS CHILEAN MESQUITE60" BOX15 WAS FIL WASHINGTONIA FILIFERACALIFORNIA FAN PALM20`–25` H 18

TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Tree Plan C
1/8" = 1'-0"
L7.12
Item 2B - Page 302


TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
ARE ROM ARECASTRUM ROMANZOFFIANUMQUEEN PALM20`–25` H7
CHI LINCHILOPSIS LINEARISDESERT WILLOW60" BOX9
KOE BIP KOELREUTERIA BIPINNATACHINESE FLAME TREE60" BOX3 PAR PRA PARKINSONIA PRAECOXPALO BREA60" BOX 2

TREE SCHEDULE D
PAR DES PARKINSONIA X `DESERT MUSEUM` DESERT MUSEUM PALO VERDE 60" BOX13 PHO DAC PHOENIX DACTYLIFERADATE PALM20`–25` H2
PRO THL PROSOPIS CHILENSIS `THORNLESS`THORNLESS CHILEAN MESQUITE60" BOX 7 WAS FIL WASHINGTONIA FILIFERACALIFORNIA FAN PALM20`–25` H 26

TREES CODE BOTANICAL NAMECOMMON NAMESIZE QTY
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Tree Plan D
1/8" = 1'-0"
L7.13
Item 2B - Page 303

SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING QTY
CAL CAL CALLIANDRA CALIFORNICABAJA FAIRY DUSTER10 GAL24" o.c.122 DAL DAL DALEA CAPITATADALEA10 GAL24" o.c.24
ERI TURERICAMERIA LARICIFOLIATURPENTINE BUSH10 GAL24" o.c.27 IMP RU2IMPERATA CYLINDRICA `RUBRA`JAPANESE BLOOD GRASS10 GAL24" o.c. 32 LEU THULEUCOPHYLLUM CANDIDUM `THUNDER CLOUD` TM THUNDER CLOUD TEXAS SAGE10 GAL24" o.c.27 LEU LAELEUCOPHYLLUM LAEVIGATUMCHIHUAHUAN RAIN SAGE10 GAL24" o.c. 46 MUH AUTMUHLENBERGIA LINDHEIMERI `AUTUMN GLOW` TM LINDHEIMER`S MUHLY10 GAL24" o.c. 56 OEN STU OENOTHERA STUBBEICHIHUAHUAN PRIMROSE10 GAL24" o.c.21

PLANT SCHEDULE A

SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING QTY
OPU EL7 OPUNTIA CACANAPA `ELLISIANA`SPINELESS PRICKLY PEAR15 GAL36" o.c.1 PAC MAR PACHYCEREUS MARGINATUSMEXICAN FENCEPOST15 GAL48" o.c. 30 SAL API SALVIA APIANAWHITE SAGE10 GAL24" o.c. 19
SEN ART SENNA ARTEMISIOIDESFEATHERY SENNA10 GAL24" o.c.14 TEC ORA TECOMA X `ORANGE JUBILEE`ORANGE JUBILEE YELLOW TRUMPET FLOWER 15 GAL24" o.c. 82 YUC RIG YUCCA RIGIDABLUE YUCCA15 GAL36" o.c. 5
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Planting Plan A
1/8" = 1'-0"
L7.20
Item 2B - Page 304

SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING QTY SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING QTY ASC SUB ASCLEPIAS SUBULATADESERT MILKWEED10 GAL24" o.c. 40 CAL CAL CALLIANDRA CALIFORNICABAJA FAIRY DUSTER10 GAL24" o.c. 63 DAL DAL DALEA CAPITATADALEA10 GAL24" o.c. 13
DAS WHE DASYLIRION WHEELERIDESERT SPOON15 GAL36" o.c.12 ECH GRU ECHINOCACTUS GRUSONIIGOLDEN BARREL CACTUS15 GAL12" o.c. 16 ERI TURERICAMERIA LARICIFOLIATURPENTINE BUSH10 GAL24" o.c.27 FOU SPLFOUQUIERIA SPLENDENSOCOTILLO15 GAL48" o.c.11
JUS CAL JUSTICIA CALIFORNICACHUPAROSA10 GAL24" o.c. 29

PLANT SCHEDULE B
LAR TRI LARREA TRIDENTATACREOSOTE BUSH10 GAL24" o.c. 80 MUH AUTMUHLENBERGIA LINDHEIMERI `AUTUMN GLOW` TM LINDHEIMER`S MUHLY10 GAL24" o.c. 34 PAC MAR PACHYCEREUS MARGINATUSMEXICAN FENCEPOST15 GAL48" o.c.4 TEC ORA TECOMA X `ORANGE JUBILEE`ORANGE JUBILEE YELLOW TRUMPET FLOWER 15 GAL24" o.c. 54 Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Planting Plan B
1/8" = 1'-0"
L7.21
Item 2B - Page 305

SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING QTY SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING QTY CAL CAL CALLIANDRA CALIFORNICABAJA FAIRY DUSTER10 GAL24" o.c. 98 DAL DAL DALEA CAPITATADALEA10 GAL24" o.c. 28
ERI TURERICAMERIA LARICIFOLIATURPENTINE BUSH10 GAL24" o.c. 46 ESC CAL ESCHSCHOLZIA CALIFORNICACALIFORNIA POPPY10 GAL24" o.c.24 EUP RIG EUPHORBIA RIGIDAGOPHER PLANT10 GAL 24" o.c.18
HES PARHESPERALOE PARVIFLORARED YUCCA15 GAL 18" o.c.5
HYP EMO HYPTIS EMORYIDESERT LAVENDER10 GAL24" o.c. 13
IMP RU2IMPERATA CYLINDRICA `RUBRA`JAPANESE BLOOD GRASS10 GAL24" o.c. 40

PLANT SCHEDULE C
LEU THULEUCOPHYLLUM CANDIDUM `THUNDER CLOUD` TM THUNDER CLOUD TEXAS SAGE10 GAL24" o.c. 49 LEU LAELEUCOPHYLLUM LAEVIGATUMCHIHUAHUAN RAIN SAGE10 GAL24" o.c. 60 OEN STU OENOTHERA STUBBEICHIHUAHUAN PRIMROSE10 GAL24" o.c. 33 OPU EL7 OPUNTIA CACANAPA `ELLISIANA`SPINELESS PRICKLY PEAR15 GAL36" o.c. 5 SAL API SALVIA APIANAWHITE SAGE10 GAL 24" o.c.38
SEN ARTSENNA ARTEMISIOIDESFEATHERY SENNA10 GAL 24" o.c.42 TEC ORA TECOMA X `ORANGE JUBILEE`ORANGE JUBILEE YELLOW TRUMPET FLOWER 15 GAL24" o.c.74 YUC RIG YUCCA RIGIDABLUE YUCCA15 GAL36" o.c.5
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Planting Plan C
1/8" = 1'-0"
L7.22
Item 2B - Page 306


SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING QTY
ASC SUB ASCLEPIAS SUBULATADESERT MILKWEED10 GAL24" o.c. 31 CAL CAL CALLIANDRA CALIFORNICA BAJA FAIRY DUSTER10 GAL24" o.c. 64 DAL DAL DALEA CAPITATADALEA10 GAL24" o.c.22
DAS WHE DASYLIRION WHEELERIDESERT SPOON15 GAL36" o.c. 10 ECH GRU ECHINOCACTUS GRUSONII GOLDEN BARREL CACTUS15 GAL12" o.c. 92 ENC FAR ENCELIA FARINOSABRITTLE BUSH10 GAL24" o.c. 13
ERI TURERICAMERIA LARICIFOLIATURPENTINE BUSH10 GAL 24" o.c.39 FOU SPLFOUQUIERIA SPLENDENSOCOTILLO15 GAL 48" o.c. 8
HES PAR HESPERALOE PARVIFLORA RED YUCCA15 GAL18" o.c. 36

PLANT SCHEDULE D
IMP RU2IMPERATA CYLINDRICA `RUBRA` JAPANESE BLOOD GRASS10 GAL24" o.c. 26 LAR TRI LARREA TRIDENTATACREOSOTE BUSH10 GAL24" o.c. 80 LEU LAELEUCOPHYLLUM LAEVIGATUM CHIHUAHUAN RAIN SAGE10 GAL24" o.c.7 OEN STU OENOTHERA STUBBEICHIHUAHUAN PRIMROSE10 GAL24" o.c.14 PAC MAR PACHYCEREUS MARGINATUS MEXICAN FENCEPOST15 GAL48" o.c. 9 SAL API SALVIA APIANAWHITE SAGE10 GAL24" o.c.11
SEN ART SENNA ARTEMISIOIDESFEATHERY SENNA10 GAL 24" o.c.14 TEC ORA TECOMA X `ORANGE JUBILEE` ORANGE JUBILEE YELLOW TRUMPET FLOWER15 GAL 24" o.c. 68

SHRUBS CODE BOTANICAL NAMECOMMON NAMESIZE SPACING QTY
Palm Canyon
Residences
551 N Palm Canyon Drive
Palm Springs, CA 92262
20115
PLOTJanuary 24, 2023
3101 W EXPOSITION PLACE
LOS ANGELES, CA 90018
PH: 323.785.1800
FAX: 323.785.1801
rios.com

ENTITLEMENTS

ENTITLEMENTS

10.09.20 05.21.21
Planting Plan D
1/8" = 1'-0"
L7.23
Item 2B - Page 307
Aerial View from Palm Canyon Dr at W Chino Dr
2 Item 2B - Page 308
Perspective View of Gated Entry
3 Item 2B - Page 309
Perspective View of Garden Gates on Chino
4 Item 2B - Page 310
RIOS | Palm Canyon Multi-Family | Entitlement Package | July 22, 2021 4 Drive Aisle
5Perspective View of Parking Court
Item 2B - Page 311
RIOS | Palm Canyon Multi-Family | Entitlement Package | July 22, 2021 5 Courtyard
Perspective View of Pool/Spa
6 Item 2B - Page 312
Perspective View looking south on Palm Canyon Dr
7 Item 2B - Page 313
Perspective View from Palm Canyon Dr at W. Chino Dr
8 Item 2B - Page 314

CITY COUNCIL STAFF REPORT
03/09/2023
SUBJECT:

FISCAL YEAR 2021-22 FINANCIAL AUDIT REPORTS OF THE CITY OF PALM SPRING
RECOMMENDATION:

Receive and file the following Financial Audit Reports for the fiscal year June 30, 2022:

Annual Comprehensive Financial Report (ACFR)
Audit Communication Letter to the City Council
Passenger Facility Charge (PFC) Report
Housing Successor Audit Communication Letter to the City Council Public Financing Authority Financial Statements
Measure J Fund Report Annual Financial Report
Measure D Independent Accountant’s Agreed Upon Procedures Measure A Independent Accountant’s Agreed Upon Procedures (Conrad CPA Firm)
Attachments
Item 3A

CITY COUNCIL STAFF REPORT

DATE: MARCH 9, 2023 BUSINESS & LEGISLATIVE

SUBJECT: F ISCAL YEAR 2021-22 FINANCIAL AUDIT REPORTS OF THE CITY OF

PALM SPRINGS

FROM: Teresa Gallavan, Interim City Manager

BY: Department of Finance and Treasury

SUMMARY:

The certified public accounting firm of The Pun Group, LLC, completed the annual financial reports of the City as of June 30, 2022.

RECOMMENDATION:

Receive and file the following Financial Audit Reports for fiscal year June 30, 2022:

• Annual Comprehensive Financial Report (ACFR)
• Audit Communication Letter to the City Council
• Passenger Facility Charge (PFC) Report
• Housing Successor Audit Communication Letter to the City Council • Public Financing Authority Financial Statements
• Measure J Fund Report Annual Financial Report
• Measure D Independent Accountant’s Agreed Upon Procedures • Measure A Independent Accountant’s Agreed Upon Procedures (Conrad CPA Firm)

STAFF ANALYSIS:

Based on the results of their au dit, The Pun Group provided the City with an unqualified opinion on the financial statements, which means that the City’s financial statements are free of material misstatements and are in accordance with Generally Accepted Accounting Principles (GAAP).

The specific financial documents on which the auditor expresses an opinion are: 1) the financial statements, and 2) notes to the basic financial statements which include required supplementary information. These documents, along with the auditor’s opinion, audit Item 3A - Page 1
City Council Staff Report
March 9, 2023 -- Page 2
FY 2021-22 Financial Audit Reports of the City of Palm Springs

communication letter, and report on internal controls f orm the core of the Annual Comprehensive Financial Report (ACFR).

Additional documents that make up the A CFR include the letter of transmittal, management’s discussion and analysis (MD&A), and a supplemental section which includes a statistical section presenting detailed information to assist the reader in assessing the economic condition of the City.

The Pun Group and City Staff are currently in the process of completing the single audit and the report should be issued by March 31, 2023. The single audit report will be a receive and file item in the consent agenda at a future City Council meeting.

The FY 2021-22 audited financial reports are available on the City’s webpage at the following link:
https://www.palmspringsca.gov/government/departments/finance- treasury/comprehensive-annual-financial-report

Hard copies of the reports are available by request to the Department of Finance and Treasury.

ALIGNMENT WITH STRATEGIC PLANNING:

This item aligns with City Council Strategic Priority 4D, Good Governance – Improve Financial Management.

FISCAL IMPACT:

None.

REVIEWED BY:

Acting Department Director: Kristopher J. Mooney
Interim City Manager: Teresa Gallavan

Item 3A - Page 2

CITY COUNCIL STAFF REPORT
03/09/2023
SUBJECT:

COUNCIL REQUEST FOR REVIEW OF A DECISION BY THE PUBLIC ARTS

COMMISSION TO DENY AN APPLICATION BY DESERT PEAK ENERGY AND WINTEC ENERGY, LTD, FOR REIMBURSEMENT OF $375,000 IN PUBLIC ART FUNDS FOR A PUBLIC ART PROJECT TO BE LOCATED AT 62950 20TH AVENUE; AND A REQUEST FOR WAIVERS OF THE ART PLACEMENT

REQUIREMENT AND REIMBURSEMENT PROCESS AS CONTAINED IN PALM SPRINGS MUNICIPAL CODE CHAPTER 3.37.

RECOMMENDATION:

Consider the application request and review all applicable testimony.1.

Adopt a Resolution entitled, “A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF PALM SPRINGS, CALIFORNIA, APPROVING THE
REIMBURSEMENT OF $375,000 IN PUBLIC ART FUNDS TO DESERT PEAK

ENERGY AND WINTEC ENERGY, LTD, FOR A PUBLIC ART PROJECT LOCATED AT 62950 20TH AVENUE; AND APPROVAL OF WAIVERS OF THE

ART PLACEMENT REQUIREMENT AND REIMBURSEMENT PROCESS AS
CONTAINED IN PALM SPRINGS MUNICIPAL CODE CHAPTER 3.37.”

2. Attachments
Item 3B

CITY COUNCIL STAFF REPORT

DATE: MARCH 9, 2023 BUSINESS & LEGISLATIVE

SUBJECT: COUNCIL REQUEST FOR REVIEW OF A DECISION BY THE PUBLIC

ARTS COMMISSION TO DENY AN APPLICATION BY DESERT PEAK

ENERGY AND WINTEC ENERGY, LT D, FOR REIMBURSEMENT OF
$375,000 IN PUBLIC ART FUNDS FOR A PUBLIC ART PROJECT TO BE LOCATED AT 62950 20
TH AVENUE; AND A REQUEST FOR WAIVERS

OF THE ART PLACEMENT REQUIREMENT AND REIMBURSEMENT

PROCESS AS CONTAINED IN PALM SPRINGS MUNICIPAL CODE
CHAPTER 3.37.

FROM: Teresa Gallavan, Interim City Manager

BY: Flinn Fagg, Deputy City Manager

SUMMARY:

This is a request by a member of City Council to review the decision by the Public Arts Commission to deny an application by Desert Peak Energy and Wintec Energy (“Applicants”) for reimbursement of $375,000 in public art funds for the installation of a public art project (“Project”) on private property. The proposed Project is intended to celebrate the renewable energy industry through the creation of murals and other artistic works to be painted on a collection of various types of recycled windmill blades arranged in a ver tical and horizontal array. Staff recommended approval of the application ; however, the Public Arts Commission voted 5- 0 to deny the application at the February 15, 2023 meeting.

Should the City Council approve the application, the Applicants have requested waivers of the following sections of the Public Arts Ordinance:

• Waive the location requirements for art on private property to allow the Project to be installed on an adjacent property; and
• Provide the reimbursement of the public art funds prior to the installation of the artwork.

RECOMMENDATION:

1. Consider the application request and review all applicable testimony; and

Item 3B - Page 1
City Council Staff Report
March 9, 2023 -- Page 2
Desert Peak Energy/Wintec Public Art Project

2. Adopt Resolution No. ____, “A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF PALM SPRINGS, CALIFORNIA, APPROVING THE REIMBURSEMENT OF $375,000 IN PUBLIC ART FUNDS TO DESERT PEAK ENERGY AND WINTEC ENERGY, LTD, FOR A PUBLIC ART PROJECT LOCATED AT 62950 20 TH A VENUE; AND APPROVAL OF WAIVERS OF THE ART PLACEMENT

REQUIREMENT AND REIMBURSEMENT PROCESS AS CONTAINED IN PALM SPRINGS MUNICIPAL CODE CHAPTER 3.37.”

BUSINESS PRINCIPAL DISCLOSURE:

The Public Integrity Disclosure Form is included as an Attachment E to this report.

BACKGROUND:

Desert Peak Energy, LLC, received approval by the Planning Commission on June 22, 2022, to construct a battery storage facility on land owned by Wintec Energy, LTD (“Applicants”). The facility is being developed on approximately 78 acres of a larger 357- acre site and consist s of up to 728 battery containers which will be installed on the property in two phases. Pursuant to Palm Springs Municipal Code Chapter 3.37, the applicant was required to pay $375,000 in public art fees as a condition of approval of the development. The applicant paid the public art fee upon issuance of the building permit for the project in December 2022.

In January 2023, the Applicants submitted a proposal for the Project on property to the south of the battery storage facility. The proposal was considered by the Public Arts Commission on February 15, 2023; the commission voted to deny the request by a vote of 5 to 0. A review of the Public Arts Commission discussion and action is provided in a later section of this report. A member of the City Council filed a formal request with the City Clerk on February 20, 2023, to review the decision of the Public Arts Commission.

STAFF ANALYSIS:

Chapter 3.37 of the Palm Springs Municipal Code (PSMC) requires a property owner to provide artwork or pay a development fee to the Public Arts Fund as part of new or reconstructed commercial or industrial development, and also for certain residential development. T he cost of the provided artwork or amount of the fee to be paid to the Public Arts Fund is based on a formula relative to the value of the proposed development.

The fee is to be paid prior to the issuance of a building permit; when a property owner provides the artwork, the fee is reimbursed to the property owner upon installation of the approved artwork on the developed property. Fees paid to the Public Arts Fund may be used by the Public Arts Commission for the installation of public art in public venues.

Artwork provided by a property owner must be approved by the Public Arts Commission prior to installation.

Item 3B - Page 2
City Council Staff Report
March 9, 2023 -- Page 3
Desert Peak Energy/Wintec Public Art Project

Project Description : The Applicants have proposed an art project that is intended to celebrate the renewable energy industry and its start in the Palm Springs area. The Project will utilize repurposed wind turbine blades and other artifacts as part of the display.

Murals will be painted on a collection of various types of recycled windmill blades arranged in both vertical and horizontal displays. Local artists will be engaged to create the art pieces on the turbine blades, focusing on the themes of climate change and green causes. In addition, the Applicants have proposed to include an original 1982 wind turbine generator (the “Carter Wind Turbine”) as part of the installation.

The proposed Project will be located on the property at 62950 20 th Avenue, which is the
site of the Palm Springs Windmill Tours. The justification for not locating the Project on the same parcel as the battery storage facility is due to the fact that the battery storage site will be fenced and inaccessible to the publ ic; in addition, the Windmill Tours site is adjacent to the I-10 Freeway and has greater visibility and access for the general public.

The budget for the Project is estimated at a total of $575,000. Approximately $200,000 will be in -kind donations from Wintec Energy, which includes the provision of windmill blades, the Carter Wind Turbine, project management fees, and engineering and permitting fees. A majority of the project budget will go towards the construction of foundations for the vertical windmill blades and the restoration/installation of the Carter Wind Turbine. Approximately $20,000 of the budget will be provided as an honorarium for artists to paint artwork or murals on the windmill blades. The applicants paid $375,000 in public art fees as part of the building permit application process for the battery storage facility and would be eligible for reimbursement of the fees pursuant to PSMC Section

3.37.130 upon installation of the Project.

A detailed description of the Project proposal and budget is included in Attachment B to this report.

Public Arts Commission Action
: The Public Arts Commission reviewed the application at their meeting of February 15, 2023, and voted to deny the application by a vote of 5 to 0.

The commissioners identified the following concerns with the Project relative to the requirements of the Public Arts Ordinance:

• The majority of funding for the project will be used for foundation work and restoration of the Carter Wind Turbine; the commissioners questioned whether the use of funds for this type of work was allowable pursuant to PSMC Section

3.37.040(d) (“Permissible Expenditures”).
• The $20,000 allocation for the artists’ honorarium represents a minor portion of the overall budget for the Project, which appears to be inconsistent with the purpose and intent of the Public Art program, and the actual artwork will be a minor component of the overall installation.
• The Applicants did not identify the artist or provide any sketches of the proposed work, as required by PSMC Section 3.37.110(3) (“Application Procedures”).

Item 3B - Page 3
City Council Staff Report
March 9, 2023 -- Page 4
Desert Peak Energy/Wintec Public Art Project

• The commissioners also raised concerns about the location of the artwork, and whether the installation would have limited accessibility.

Based on these concerns, the commission voted to deny the application. A n excerpt of the minutes from the meeting and a copy of the meeting action summary are included as Attachment C to this report.

Council Review of the Public Arts Commission Decision
: PSMC Section 2.06.030
establishes the procedures for councilmember review of decisions of board and commissions that would not otherwise be forwarded to the City Council. The code requires that a councilmember provide written notice to the City Clerk within 15 days following the date of the action which is the subject of the review. A councilmember filed a request for review of the Project with the City Clerk on February 20, 2023.

In considering the application, the City Council shall set aside the action of the board or commission and shall conduct a de novo review. The following paragraphs provide a discussion of the issues raised by the Public Arts Commission, and an assessment by staff relative to the applicable requirements of the Public Arts Ordinance (PSMC Chapter

3.37).

In considering this application, it should be noted that the development for which the public art fees were required, and the proposed theme of the Project are unique, and a certain degree of latitude may be appropriate in considering the application request. As noted by the Applicants, the art piece intends to celebrate the renewable energy industry and its start in Palm Springs, which serves as a justification for utilizing windmill blades and the Carter Wind Turbine as the principal components for the installation.

In responding to the concerns of the Public Arts Commission on the appropriate use Public Art funds for the Project, PSMC Section 3.37.040(d) stipulates that funds may be used for:
• The costs associated with the purchase and installation of the artwork; • Pedestals or other objects which are necessary for the proper presentation of the artwork; and
• Administrative expenses, such as permitting and project management.

Similarly, the code identifies ineligible expenditures, which include reproductions of original artwork, mass-produced artwork, non-artist designed landscape or architectural elements, and rehabilitation or preservation of historic buildings. Should the City Council determine that the Carter Wind Turbine is an integral component of the overall art installation, the use of funds for its refurbishment and installation would be appropriate.

The Public Arts Commission also identified an issue with the percentage of the project budget that would be directly attributed to the creation of artwork on the windmill blades; the Applicants have proposed that $20,000 of the overall $575,000 project budget be Item 3B - Page 4
City Council Staff Report
March 9, 2023 -- Page 5
Desert Peak Energy/Wintec Public Art Project

utilized for artwork. While this is a considerably minor amount based on the overall budget, it may be appropriate to consider the arrangement of the windmill blades as part of the overall composition of the artwork, and not just the painting of the windmill blades.

Consequently, the City Council may find that all of the components comprise the artwork, and that the distribution of the budget is appropriate based on the unique characteristics of the Project.

Another issue identified by the commission was the fact that the Applicants did not identify the artists or submit images of the proposed artwork as required by PSMC Section

3.37.110. It is recommended that the Applicants provide the artist biographies and proposed sketches to the City for review and approval prior to installation; this requirement is included as a condition of approval of the application.

The Public Arts Ordinance grants the City Council latitude in the reimbursement of public art fees. PSMC Section 3.37.070(f) allows the City Council to waive the requirements of the Public Arts Ordinance, subject to an agreement with the applicant, and provided that the approval is consistent with the purpose and intent of the ordinance. Staff would make the following findings in support of the Project:

1) The Project is consistent with the purpose of the Public Arts Ordinance in that it will enhance the economic vitality of the community and unique character of Palm Springs by celebrating the renewable energy industry and its place in the city’s history.
2) The Project is consistent with the funding requirements of PSMC Section

3.37.040(c), in that funding will go towards the purchase of components , construction of foundations, installation, artwork, and administrative expenses related to the Project.
3) The Project is consistent with PSMC 3.37.080 relative to the placement of the artwork, in that the proposed site will be open and accessible to the public.

Waiver Request – Project Location
: The Public Arts Ordinance requires that public art
provided by a property owner be installed on the property that is being developed. PSMC Section 3.37.080 requires that the art be placed in an outdoor area that is accessible and used by the public a minimum of 18 hours per day; indoor locations may be eligible if accessible to the public a minimum of 12 hours per day.

The Applicants have requested to install the Project on a parcel that is separate from the battery storage facility. As previously noted, the request is based on the fact that the battery storage parcel is fenced and inaccessible to the public; therefore, the parcel would not be in compliance with the Public Art Ordinance. As a solution to this issue, it is proposed that the Project would be located on the site of the Palm Springs Windmill Tours, located on 20
th Avenue adjacent to the I -10 Freeway. This site would comply with the accessibility requirements of the code and would provide greater visibility of the artwork.

A map showing the location of the Project site relative to the battery storage facility site is included below.

Item 3B - Page 5
City Council Staff Report
March 9, 2023 -- Page 6
Desert Peak Energy/Wintec Public Art Project

Off-site art installations for artwork provided by an applicant cannot be approved by the Public Arts Commission. However, PSMC Section 3.37.070(f) allows the City Council to waive the requirements of the Public Art Ordinance provided the requested deviation address the goals of the ordinance “…in a manner equally or more favorable to the city than would be achieved by strict compliance with this chapter.” It is staff’s assessment that the off-site installation meets the goals of the ordinance by providing greater visibility and accessibility to the proposed artwork.

FIGURE 1: PROJECT LOCATION

Item 3B - Page 6
--- Cit y Boundar y
City Council Staff Report
March 9, 2023 -- Page 7
Desert Peak Energy/Wintec Public Art Project

Waiver Request – Reimbursement of Funds : The Applicants have requested that the $375,000 of Public Arts Funds be reimbursed prior to installation of the artwork , rather than after the Project is completed. PSMC Section 3.37.070(c) requires that the public art fees be paid upfront prior to the issuance of a building permit; pursuant to PSMC Section 3.37.130, reimbursement of these funds is provided after the artwork has been installed, approved by the Public Arts Commission, and accepted by the City.

The procedural requirements of this process can be somewhat problematic for applicants, in that they are required to pay public art funds to the City to receive a building permit and then must pay that same amount of money (or more) to install the artwork before receiving a reimbursement. Conversely, the City must ensure that the artwork is installed in accordance with the approval granted by the Public Arts Commission as a means to guarantee compliance with the ordinance.

As a solution to this issue, the Applicants may enter into an agreement with the City which will establish the terms for the reimbursement of the funds in advance of installation of the artwork. These terms would include the requirement for all invoices to be submitted to the City for review and approval, schedule for completion of the Project, and issuance of a certificate of occupancy once the work is completed in accordance with the approved design. The agreement would also establish penalties for failure to comply with the terms of the agreement. The requirement for an agreement has been included in the approving resolution for this application.

REVIEWED BY:

Department Director: Jay Virata
Deputy City Manager: Flinn Fagg
Interim City Manager: Teresa Gallavan

ATTACHMENTS:

A. Resolution.

B. Application and Applicant Letters.

C. Public Arts Commission Minutes Excerpt and Action Minutes.

D. Public Arts Commission Staff Report – 02/15/23.

E. Public Integrity Disclosure Form.

Item 3B - Page 7

ATTACHMENT A

Item 3B - Page 8
RESOLUTION NO. _____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

PALM SPRINGS, CALIFORNIA, APPROVING THE
REIMBURSEMENT OF $375,000 IN PUBLIC ART FUNDS

TO DESERT PEAK ENERGY AND WINTEC ENERGY, LTD,
FOR A PUBLIC ART PROJECT LOCATED AT 62950 20
TH
AVENUE; AND APPROVAL OF WAIVERS OF THE ART

PLACEMENT REQUIREMENT AND REIMBURSEMENT

PROCESS AS CONTAINED IN PALM SPRINGS
MUNICIPAL CODE CHAPTER 3.37.

WHEREAS, the City Council created the Public Arts Commission according to chapter 2.24 of the Palm Springs Municipal Code (PSMC) Section 2.24.010; and

WHEREAS, the City Council created application procedures for placement of artwork on private property according to PSMC Section 3.37.110 of the Palm Springs Municipal Code; and

WHEREAS, the City Council created the procedure for refunding the payment of the public arts fee and provision of artwork in lieu of the fee; and

WHEREAS, the Applicants, Desert Peak Energy and Wintec Energy, LTD. (“Applicants”), filed an application for reimbursement of the public arts fee for a proposed artwork entitled “Palm Springs Renewable Energy History” (“Project”), to be located at 62950 20
th Avenue; and

WHEREAS, on February 15, 2023, the Public Arts Commission held a public meeting to consider the application for the Project in accordance with applicable law, and carefully reviewed and considered all of the evidence presented in connection with the discussion on the Project, and voted 5-0 to deny the Project based on an inability to find that the application met the purpose and intent of the public art ordinance; and

WHEREAS, on February 20, 2023, the City Council filed a timely request to review the Public Arts Commission decision pursuant to the procedures in Chapter 2.06 of the Palm Springs Municipal Code (PSMC); and

WHEREAS, on March 9, 2023, the City Council of the City of Palm Springs held a public meeting to consider the Application in accordance with applicable law; and

WHEREAS, the City Council has carefully reviewed and considered all of the evidence presented in connection with Application, including but not limited to the staff report, and all written and oral testimony presented; and

WHEREAS, the City Council makes the following findings relative to the proposed Project:
1) The Project is consistent with the purpose of the Public Arts Ordinance in that it will enhance the economic vitality of the community and unique Item 3B - Page 9
Resolution No. _____

Page 2 ends

character of Palm Springs by celebrating the renewable energy industry and its place in the city’s history.
2) The Project is consistent with the funding requirements of PSMC Section

3.37.040(c), in that funding will go towards the purchase of components, construction of foundations, installation, artwork, and administrative expenses related to the Project.
3) The Project is consistent with PSMC 3.37.080 relative to the placement of the artwork, in that the proposed site will be open and accessible to the public.
4) The Applicants shall enter into an agreement with the City, in form and content approved by the City Attorney and the City Manager, providing for the Applicant’s acquisition and installation of artwork in connection with the development of the project that, based on substantial evidence presented to the City Council, addresses the goals and aims of Chapter 3.37 in a manner equally or more favorable to the City than would be achieved by strict compliance with that chapter.

THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1.

T hat the foregoing Recitals are true and correct and are incorporated herein by this reference.

SECTION 2. That the City Council hereby approves the Project proposed for the property at 62950 20 th Avenue, Palm Springs, finding that the Project conforms to the requirements set forth in PSMC Section 3.37.110 and 3.37.130. Such approval is subject to the following condition(s):

A. Prior to installation, Applicants shall provide artist biographies and sketches, photographs, or other documentation to indicate the nature of the proposed artwork that will be applied to the windmill blades for review and approval by the City.

SECTION 3
. That the City Council hereby approves a waiver from PSMC Section

3.37.080 to allow the proposed Project to be installed on the parcel at 62950 20th Avenue (APN #668-411-010), which is separate from the development parcel for which the public art fees were paid, as the proposed location will allow public access to the artwork in conformance with PSMC Section 3.37.080(a).

SECTION 4
. That the City Council hereby approves a waiver from PSMC Section

3.37.130 to reimburse the Applicants for the Project in advance of installation, subject to the following condition(s):

A. Such reimbursement shall be subject to execution by City and Applicant(s) of an agreement in a form and content approved by the City Attorney and City Manager. The agreement shall provide for such matters as the use of Item 3B - Page 10
Resolution No. _____

Page 3 ends

funds, invoice review process, the acquisition, installation and maintenance of the artwork, insurance, and issuance of certificate of occupancy for the improvements.

ADOPTED THIS 9TH DAY OF MARCH, 2023.

TERESA GALLAVAN

INTERIM CITY MANAGER

ATTEST:

BRENDA PREE, MMC

CITY CLERK
Item 3B - Page 11
Resolution No. _____

Page 4 ends

CERTIFICATION

STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.

CITY OF PALM SPRINGS )

I, BRENDA PREE , City Clerk of the City of Palm Springs, h ereby certify that Resolution No. ____ is a full, true and correct copy, and was duly adopted at a regular meeting of the City Council of the City of Palm Springs on _______________________, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Palm Springs, California, this ______ day of ______________, _________.

Brenda Pree, City Clerk
City of Palm Springs, California
Item 3B - Page 12

ATTACHMENT B

Item 3B - Page 13
Item 3B - Page 14
t, •

PUBLIC ART PROPOSAL

ARTISTS COMMEMORATION OF PALM SPRINGS RENEWABLE ENERGY HISTORY

THE PROJECT
Desert Peak Energy Center proposes a Public Arts Project celebrating the birth of the renewable industry in Palm Springs. It will involve creation of murals and other artistic works to be painted on a collection of various types of recycled windmill blades to be placed in a vertical array installed in connection with the restoration of and re­ installation of Palm Springs first windmill. Funded by the $375,000 public art fee paid to the City in connection with the construction of NextEra's large utility grade battery facility currently under construction and additional funding of approximately $200,000 donated in kind by Wintec Energy.

Palm Springs and the surrounding area is arguably becoming the renewable energy capital of California with its modern wind and solar facilities and now NextEra's under construction largest battery project in California. The public interest in the history and future of wind energy has attracted large numbers of tourists and locals to visit the existing windmill energy museum currently located on the site of the Windmill Tour facility. This Project is conceived so that posterity will know how it all began, here in Palm Springs. The Museum and the surrounding art installation will be open to the public during regular business hours at no charge.

THE LOCATION
The artist's array and the refurbished original windmill will be located adjacent to the site of the current Windm ill Tour Facility and Museum, at the east entrance to the San Gorgonio Pass adjacent to Interstate 10 between Indian Canyon and Highway 62 at 62950 20th Avenue, Palm Springs. The project will be adjacent to an existing outdoor exhibit area displaying many original windmills so that the evolution of design and size may be experienced.

THE PROPOSAL
The Project is being proposed by Desert Peak Energy and Wintec Energy, LTD. Desert Peak Energy proposes using the $375,000 Public Art Fee it recently paid to the City to help create the Project In addition to the Public Arts Fee Wintec Energy will underwrite the additional in kind expenses which are estimated to be approximately $200,000.

Item 3B - Page 15
That will include contributing land rights for the art displays, windmill blades and other artifacts, renewable energy exhibits and staffing.

Wintec Energy will also donate the original Carter 25kW Wind Turbine generator to the project. It is the first wind turbine installed in Palm Springs in 1982 and marks the start of wind energy in Palm Springs. It stood on a 80-foot pole and was held in place with guy wires along four compass points. The turbine is a valuable artifact because it stands in stark contrast to the surrounding wind turbines and acts as a clear example of the innovations achieved in harnessing wind energy. Of the over 200 such windmills installed in Palm Springs the Carter Wind Turbine is the only one left of that groundbreaking step in renewable energy. As new innovations in wind energy were developed the turbine became obsolete and preserved in storage since its removal in 1987. As part of the Project it will be restored to operating condition and reinstalled by local experts with knowledge of the windmill. Fortunately original operat ing and installation documents still exist in Wintec's archives.

The project will also focus on creating and displaying an outdoor art exhibit made from repurposed wind turbine blades and other artifacts . An assortment of windmill blades ranging from 30 feet to 80 feet in length will be donated to the Project by Wintec and others. Local artists will be asked to bond their artistic vision to the blades to create art pieces dedicated to "save the planet", "climate change", "Palm Springs as a leader in green causes" and similar themes. Such a theme was pioneered on a single windmill blade currently located at the Palm Springs Art Museum in the heart of downtown Palm Springs. After completion, the blades will be installed both vertically, and in some cases horizontally, on concrete foundations and will form an attractive grouping of the artists' work. The blades decorated by local artists and visible from the 1-10 will be lit at night so that the quality of art is exhibited to all.

PROJECT MANAGEMENT
The overall Project will be managed by Wintec Energy under supervision of Desert Peak.

As such they will oversee the exhibits which will be curated by experts in the field of renewable energy. Blade art and artists will be supervised by the lead Artistic Director.

Item 3B - Page 16
f.

TIMELINE
The timeline for the Project will commence upon allocation of funds of the Desert Peak mandatory Art fees. The overall timeline to complete the project will be approximately 270 days. The following list is anticipated timelines fo r each facet of the overall plan and the necessary requirements to comp lete the Project:
• Complet ing drawings for the schematics of the site. Leveling and preparing the site for foundations and utilities. Fencing the area for security of the artwork and other installations , pouring foundations and installing blades vertically. 180 days • Moving from storage, restoring the Carter 25 kW windmill and placement on a new foundation: 120 days
• Locating sources and securing delivery of various surplus windmill blades: 60 days • Preparat ion of blades for artists, cleaning and repaint ing as necessary: 30 to 45 days (depending on how many blades are included.)
• Art creation start to finish, installation and lighting of blades, creation of signage and renewable energy exhibits: 180 days
• Completion of Project and opening date: 270 days
BUDGET
Restoration of Carter Wind Turbine, including , transporting to the site, Pouring new foundation and erection at the site. $275,000 Windmill blades (in kind donation). $ 50,000
Carter 25 kW windmill (in kind donation ). $100,000
Transportat ion of Windmill Blades, foundations and mounting . $ 50,000 Truck and crane rentals. $10,000
Artists' honorarium , $ 20,000
Reserve Contingencies, $ 20,000
Project management (in kind donation), $ 15,000
Land rights, engineering perm itting expense etc.(in kind). $ 35,000 TOTAL $575,000
Item 3B - Page 17
,,,._
June 15, 2022
Brenda Pree, MMC
Palm Springs City Clerk
3200 East Tahquitz Canyon Way
Palm Springs California 92262
c/o: City of Palm Springs Public Arts Commission
Russell Pritchard, Chair
Gary Armstrong
Shawnda Thomas Faveau
Matthew Lesniak
Barrett Newkirk
Jay Virata, Staff Liaison
Desert Peak Energy Center, LLC
700 Universe Blvd, Juno Beach, FL 33408
RE: Support Letter from Desert Peak Regarding Cultural/Public Arts Project Located at 62950 20th Avenue , Palm Springs, California (Item Hl on February 15, 2023's Public Arts Commission Agenda)
Dear Commissioners,
Desert Peak Energy Center, LLC (Desert Peak), an indirect and wholly -owned subsidiary of NextEra Energy Resources, is currently develop ing and constructing a 700 MW, util ity-scale battery storage project in two phases, located at the northern border of the City of Palm Springs. When complete , this battery w ill be one of the largest batteries deployed in the world - a testament to the City of Palm Springs' commitment toward s developing critica l energy infrastructure. Desert Peak also continues NextEra Energy Resources' long history of investing in the City of Palm Springs, Riverside County, and the state of California in enabling renewables and improving grid resiliency.

In November 2022, Desert Peak paid a public arts fee of $375,000 in connection with the issuance of the building permits for this battery storage project. Desert Peak's original plan was to provide an in-kind, artistic/cultural improvement proposal in cooperation with Wintec Energy in lieu of paying the pub lic arts fee . However, due to delays in the issuance of the build ing permit processes and a critical timeline in commencing construc tion in order to provide critica l grid capacity by the summer of 2023, Desert Peak funded the public arts fee in advance of the in-kind process in orde r to secure building permit s to meet our construction schedule.

Item 3B - Page 18
Desert Peak Energy Center, LLC
700 Universe Blvd, Juno Beach, FL 33408
At this time, we are excited that Wintec Energy has proceeded with design of the in-kind project located at 62950 20th Avenue, Palm Springs, CA 92262, as described in the proposal filed with you. We are part icularly pleased that the original wind turbine installed in the San Gorgon io Pass in 1982 will be restored and put back into service as an operating cultural exhibit . This wil l be a valuable artifact testifying to the long history of successful wind development powering the local Palm Springs area both electrically and economically. We under stand that the project will have a dedicate d parking lot, and appropriate monument signs describing the project and the circumstances of the project 's installat ion and operation . We recognize that the project will be installed on property adjacent to Inter state 10 and easily available to the public, especially given our battery project site is not easily accessible.

We are particu larly pleased that part of the project involves re purposing original windmill blade s in a fashion which will outline famous histo rical structures such as the Parthenon , Stonehenge, and a sundial composed of a 60-foot orig inal windmill blade together with appropriate hour marke rs. So much of the history of the Coachella Valley has been lost to the historical record, but this is a chance to preserve the unique history of renewable energy as it evolved here in Palm Springs to the benefit of fut ure generations . These improvement s will be available to tourists, families and particularly schoolchi ldren who wil l tour these facilities as wel l as an already existing solar generating facil ity, at no cost.

Desert Peak Energy Center, LLC respectfully requests that you refund our $375,000 public arts fee so that we may contract with Wintec Energy for thi s project or that the Public Arts Commission contracts with Wintec directly for this project, as the Commission sees fit.

To conclude, we strong ly support Wintec Energy's application for approval of this project and urge you to vote in the affirmative at the hearing on February 15th. Please do not hesitate to contact me at dexter.liu@n extera energy.com if you have any questions.

Sincerely,
Dexter Liu
Executive Director
Desert Peak Energy Center, LLC

Item 3B - Page 19

ATTACHMENT C

Item 3B - Page 20

EXCERPT OF MINUTES

At the Public Arts Commission meeting of the City of Palm Springs , held February 15, 2023, the Public Arts Commission took the following action:

H1. Consider request from Desert Peak Energy and Wintec Energy, LTD, for reimbursement of Public Art Funds in the amount of $375,000 for a public art project located at 62950 20th Avenue, Palm Springs.

Director Virata provided an overview of the application request.

Members of the Public Arts Commission offered the following comments regarding the application:
• Fees paid into the Public Art Fund are generally for an original work of art commissioned with an artist; no representation of the artwork was provided with the application, nor was an artist identified.
• The only aspect of original art identified in the application is for the painting of the wind turbine blades, which is estimated to be approximately $20,000 of the overall project cost; this seems to fall shor t of the justification for a refund of the Public Art fees.
• The proposed artwork does not meet the requirements of PSMC Section

3.37.070, in that the amount expended on art must be equal to the program allocation.
• The majority of the budget is for refurbis hing or restoring windmills, and a limited amount of the project budget is allocated to artwork. • The Public Art Fund is only allowed to fund art, and not for structures or refurbishing a building; the commission questioned if there is a way to define the entire installation as art.
• The commission cited the example of the sculpture “Isabelle,” which was installed by the property owner of the Rowan Hotel development, in that the work was completed by a world-renowned artist and renderings of the actual art piece were provided to the commission for review prior to installation. • The project is quite different in approach and scale than any other application that has come before the commission, but the amount dedicated to artwork is a small portion of the budget.
• The commission questioned the amount of budget used for foundation and site work; t he applicant noted that the cost of the foundation work is necessary to support the vertical installation of the blades, and that Public Art Funds may be used for such purposes.
• There is not a lot of art in the proposal; there are windmill blades, but the art is lacking.
• The commission suggested that the blade pieces should be brought closer to the community where more residents would have access to view them. • It was stated that the project was a good idea, but needs to be reworked.

Item 3B - Page 21
Public Arts Commission Meeting - Excerpt
City of Palm Springs
February 15, 2023

2 ACTION: Pritchard, seconded by Armstrong, to deny the application.

I, JAY VIRATA, Community and Economic Development Director for the City of Palm Springs, hereby certify that the above action was taken by Public Arts Commission of the City of Palm Springs on the 15th day of February, 2023, by the following vote:

AYES: Faveau, Lesniak, Newkirk, Vice Chair Armstrong, Chair Pritchard NOES: None
ABSENT: None

___________________________________
Jay Virata
Community and Economic Development Director

Item 3B - Page 22

PUBLIC ARTS COMMISSION MEETING MINUTES

CITY OF PALM SPRINGS, CALIFORNIA
February 15, 2023
Palm Springs City Hall
3200 E. Tahquitz Canyon Way
Large Conference Room

Pursuant to Assembly Bill 361, this meeting was conducted by teleconference and in- person.

A. CALL TO ORDER:

A regular meeting of the Palm Springs Public Arts Commission was called to order by Chair Pritchard on Wednesday, February 15, 2023, at 5:30 p.m.

B. ROLL CALL:

Present: Commissioners Shawnda Favreau, Matthew Lesniak, Barret Newkirk, Vice-chair Armstrong, Chair Pritchard.

City Staff: Jay Virata

C. PRESENTATIONS:

1. DesertX Installation Site Presentation

Mara Gladstone of Desert X provided a presentation on the planned exhibition by Lauren Bon and Metabolic Studio called Metabolism which incorporates art, science, and technology, to be devices of wonder and to suggest solutions for environmental issues. DesertX will take place March 4 – May 7, 2023. This item was heard after Item G (Remarks from the Vice-Chair).

D. ACCEPTANCE OF AGENDA:

MOTION BY COMMISSIONER LESNIAK, SECOND BY COMMISSIONER
NEWKIRK, CARRIED 5-0 TO ACCEPT THE AGENDA

E. PUBLIC COMMENTS:

There were no public comments

F. REMARKS FROM THE CHAIR:

Budget Update / Report tabled until March meeting.

Item 3B - Page 23
Public Arts Commission Meeting
Action Summary – February 15, 2023

Page 2 ends

G. REMARKS FROM THE VICE CHAIR:

Request of fellow commissioner to document and collect event and project information and be aware of relevant ordinances applicable to use of Public Arts Fund.

H. ITEMS FOR DISCUSSION/APPROVAL:

1. Consider request from Desert Peak Energy and Wintec Energy, LTD, for reimbursement of Public Art Funds in the amount of $375,000 for a public art project located at 62950 20th Avenue, Palm Springs.

MOTION BY CHAIR PRITCHARD, SECOND BY VICE-CHAIR ARMSTRONG, CARRIED 5-0 TO APPROVE DENIAL OF THE REQUEST FROM DESERT PEAK

ENERGY AND WINTEC ENERGY, LTD, FOR REIMBURSEMENT OF PUBLIC ART FUNDS INT EH AMOUNT OF $375,000 FOR A PUBLIC ART PROJECT LOCATED AT 62950 20TH AVENUE, PALM SPRINGS.

2. Discuss and approve a budget of $6,642 to support DesertX with permit fees ($1,642) and the art installation ($5,000) in a vacant hotel located at 2249 North Palm Canyon at Racquet Club.

MOTION BY COMMISSIONER NEWKIRK, SECOND BY VICE-CHAIR
ARMSTRONG, CARRIED 5-0 TO APPROVE A BUDGET OF $6,642 TO

SUPPORT DESERTX WITH PERMIT FEES AND THE ART INSTALLATION IN A VACANT HOTEL LOCATED AT 2249 NORTH PALM CANYON AT RACQUET CLUB.

3. Discuss and approve a budget of $25,000 to support "Illuminate Palm Springs" a Palm Springs life event curated by Lance Fung for Fall 2023.

MOTION BY CHAIR PRITCHARD, SECOND BY VICE-CHAIR ARMSTRONG, CARRIED 5-0 TO APPORVE A BUDGET OF $25,000 TO SUPPORT
“ILLUMINATE PALM SPRINGS” A PALM SPRINGS LIFE EVENT CURATED BY LANCE FUNG FOR FALL 2023.

4. Discuss and approve re-installation of Lawn Chair art piece at the mid-block of Museum Way between PS Art Museum and Marilyn Monroe Statue for $2,900 without a concrete pad, or for $13,500 on an 8’ x 16’ x 18” high concrete pad.

MOTION BY CHAIR PRITCHARD, SECOND BY COMMISSIONER NEWKIRK, CARRIED 3-2 TO RE-INSTALLATION OF LAWN CHAIR ART PIECE AT THE

MID-BLOCK OF MUSEUM WAY BETWEEN PS ART MUSEUM AND MARILYN MONROE FOR A COST OF $2,900 FOR A PERIOD OF ONE YEAR.

Item 3B - Page 24
Public Arts Commission Meeting
Action Summary – February 15, 2023

Page 3 ends

5. Discuss and approve a budget of $8,500 to move "Intersecting Cubes” from Tamarisk and North Palm Canyon to the west side of South Palm Canyon between Baristo Road and Ramon Road.

THIS ITEM WAS TABLED UNTIL MARCH.

6. Discuss and approve the "gift" of art piece "Pinwheel " by artist Larry Lubow from Ann Sheffer, valued at $20,000 with installation site to be determined after approval.

MOTION BY CHAIR PRITCHARD, SECOND BY VICE-CHAIR ARMSTRONG, CARRIED 5-0 TO APPROVE GIFT OF ART PIECE “PINWHEEL”BY ARTIST LARRY LUBOW FROM ANN SHEFFER, VALUED AT $20,000 WITH
INSTALLATION SITE TO BE DETERMINED AFTER APPROVAL.

7. Discuss and approve a budget of $1,000 for art materials and outreach supplies for the OnePS Picnic on March 25th, 2023.

MOTION BY COMMISSIONER NEWKIRK, SECOND BY VICE-CHAIR
ARMSTRONG, CARRIED 5-0 TO APPROVE A BUDGET OF $1,000 FOR

PRINTING, OUTREACH SUPPLIES, AND AWNING FOR THE ONEPS PICNICK ON MARCH 25, 2023.

I. PROJECT UPDATES:

1. General commissioner reports or comments.

Vice-chair Armstrong provided updates on liaison activities with the Parks and Recreation Commission, Airport Commission, and Human Rights Commission, noting Banned Booty was installed in the Airport. Vice-chair reiterated commissioners be present and document Public Art related events.

Commissioner Newkirk reported he met with another neighborhood organization for a potential grant.

Commissioner Faveau reported on the next level of electric box art that is taking place. She also reported Richard Wyatt is ill but working with other artists on options to continue the James O Jesse mural project and will work with staff and City Attorney on whether a modification to the agreement will be necessary.

Commissioner Lesniak reported that the price of Crawler was estimated to be $65,000 in October 2022 when first presented, but the price had increased to $126,000.

Item 3B - Page 25
Public Arts Commission Meeting
Action Summary – February 15, 2023

Page 4 ends

J. REPORT FROM DIRECTOR/STAFF:

None.

ADJOURNMENT: The Public Arts Commission will adjourn to a March 15, 2023, at 5:30 p.m. in the Large Conference Room of Palm Springs City Hall located at 3200 E.

Tahquitz Canyon Way.

MOTION BY CHAIR PRITCHARD, SECOND BY VICE-CHAIR ARMSTRONG, CARRIED 5-0 TO ADJOURN AT 6:45 PM TO A REGULAR MEETING ON MARCH 15, 2023, AT 5:30 PM IN THE LARGE CONFERENCE ROOM OF CITY HALL LOCATED AT 3200 E. TAHQUITZ CANYON WAY.

Respectfully submitted,

/s/ Jay Virata
______________________________
Jay Virata, Director
Community & Economic Development Department

Item 3B - Page 26

ATTACHMENT D

Item 3B - Page 27

MEMORANDUM

DATE: February 15, 2023

TO: PALM SPRINGS PUBLIC ARTS COMMISSION

FROM: JAY VIRATA, COMMUNITY & ECONOMIC DEVELOPMENT DIRECTOR

SUBJECT: CONSIDER REQUEST FROM DESERT PEAK ENERGY AND WINTEC

ENERGY, LTC, FOR REIMBURSEMEENT OF PUBLIC ART FUNDS IN
THE AMOUNT OF $375,000 FOR A PUBLIC ART PROJECT LOCATED AT 62950 20
TH AVENUE, PALM SPRINGS.

RECOMMENDATION:

1. Consider request from Desert Peak Energy and Wintec Energy, LTD, for reimbursement of Public Art Funds in the amount of $375,000 for a public art project locate at 62950 20th Avenue, Palm Springs.

2. If approved, adopt Resolution No. 23-0 01 PAC recommending the City Council approve the Public Arts Project proposal celebrating the birth of the renewable industry in Palm Springs by Desert Peak Energy Center and Wintec Energy, LTD

REPORT:

On January 23, 2023, Desert Peak Energy Center and Wintec Energy, LTD, (Proposer) submitted a proposal for a Public Arts Pr oject (Project) celebrating the birth of the renewable industry in Palm Springs (Attachment 1). The artwork will involve creation of murals and other artistic works by local artists to be painted on a collection of various types of recycled windmill blades ranging from 30 feet to 80 feet in length to be arranged in a vertical array. The Project will also include the restoration of and reinstallation of Palm Springs’ first windmill.

Proposer is requesting the Palm Springs Public Art Commission recommend the City council refund $375,000 of Public Art Fees pa id to the City for the NextERA large utility grade batter facility currently under construct ion. Proposer. Wintec Energy, LTD, will underwrite the additional in-kind expenses which are estimated to be approximately $200,000, for a total Project cost of $575,000.

Chapter 3.37 of the City Municipal Code for Public Arts Fee, Fund and Program is provided as Attachment 2.

Section 3.37.070 of the City Municipal Code requires developers to provide artwork or pay the art fee. Key provisions of this Section include:
x 3.37.070 (a) The applicant shall be deemed to have satisfied his or her obligations under this chapter through the placement of artwork in a manner consistent with this chapter, valued at an amount equal to the program allocation.

Item 3B - Page 28
Wintec Public Art
February 15, 2023 Page 2

x 3.37.070 (b) In lieu of placement of an approved artwork, the applicant may, at his or her discretion, pay to the city for d eposit into the public arts fund an amount equal to the program allocation set forth in subsection (d) of this section.

x 3.37.070 (e) Nothing in this section shal l prohibit the applicant from placing an approved artwork with acquisition and installation costs in an amount less than the program allocation; provided that the applicant shall also pay to the public arts fund an amount equal to the difference betwee n the program allocation and the costs of acquisition and installation of such artwork.

x 3.37.070 (f) Nothing herein shall restri ct the city council from waiving the requirements of this chapter, in whole or in part, with respect to any project otherwise subject to the prov isions of this chapter, provided that the city council determines that the project applicant has entered into an agreement with the city providing for the applicant’s acquisition a nd installation of artwork in connection with the development of the project which addresses the goals and aims of this chapter in a manner equally or more favorable to the city than would be achieved by strict compliance with this chapter. In such an event, the city council shall make findings to this effect on the basis of substantial evidence.

Section 3.37.080 provides criteria for art site acceptability as follows:
x 3.37.080 (a) Placement of Art by Applic ant. The applicant shall place artwork in outdoor areas of the private property that are accessible and used by the public a minimum of eighteen hours per day. Interior spaces, including lobbies, courtyards, malls, etc., may be eligible if they are accessible to the public a minimum of twelve hours per day.

x 3.37.080 (b) Art Purchased through Public Arts Fund. When selecting the location for art purchased through the public arts fund, preference shall be given to publicly accessible public places. This would inclu de libraries, parks, office buildings, sidewalks, traffic islands, etc. Lobbies, plazas, adjacent open spaces or exterior treatment of publicly owned buildings shall be potential sites, but the offices themselves of publicly owned buildings shall not be considered acceptable sites.

Section 3.37.090 of the Municipal Code provides Criteria for Artwork Selection which includes quality, media, style, environme nt, permanence, elements of design, and diversity.

Section 3.37.110 of the Municipal Code provides application procedures for placement of artwork on private property. This includes:

3.37.110.3 (A) Preliminary sketches, phot ographs, or other documentation of sufficient descriptive clarity to indicate the nature of the proposed artwork;

3.37.110.3 (B) An appraisal or other evidence of the value of the proposed artwork, including acquisition and installation costs;
Item 3B - Page 29
Wintec Public Art
February 15, 2023 Page 3

3.37.110.3 (C) Preliminary plans containing such detailed information as may be required by the public arts commission to adequately evaluate the location of the artwork in relation to the proposed development, and its compatibility with the proposed development (the artwork shall be an integral part of the landscaping and/or architecture of the building), including compatibility with the character of adjacent conforming developed parcels and existing neighborhoods if necessary to evaluate the proposal;

3.37.110.3 (D) A narrative statement to demonstrate that the artwork will be displayed in an area open and freely available to the general public, or otherwise provide public accessibility in an equivalent manner based on the characteristics of the artwork or its placement on the site; and

3.37.110.3 (E) Maintenance factors required to insure its permanence.

Section 3.37.130 provides procedures for refund of Public Arts Fees for artwork in lieu of fee.
x If in-lieu artwork has been placed subsequent to payment of a public arts fee, the applicant shall submit to the arts administr ator a written request for refund of the amount spent on the artwork placed on the applicant’s property. The amount to be refunded shall not exceed the amount that would have been paid into the public arts fund should the applicant have chosen to pay a fee instead of place artwork on the site. The request for reimbursement shall be submitted after the artwork is installed, approved by the public arts commission and accepted by the city.

The Proposer has paid into the Public Arts Fund approximately $375,000. According to the Proposer the total cost of the artwork is estimated to be $575,000. The timeline to complete the project is 270 days.

Minutes from the Public Arts Commission meeting of September 14, 2017, when the most recent request for refund of Public Art Fees was discussed, are also provided for reference (Attachment 3).

A resolution for Public Arts Commission adoption is provided as Attachment 4 should the Public Arts Commission wish to approve the Project.

Item 3B - Page 30

PUBLIC ART PROPOSAL

ARTISTS COMMEMORATION OF PALM SPRINGS RENEWABLE ENERGY HISTORY

THE PROJECT
Desert Peak Energy Center proposes a Public Arts Project celebrating the birth of the renewable industry in Palm Springs. It will involve creation of murals and other artistic works to be painted on a collection of various types of recycled windmill blades to be placed in a vertical array installed in connection with the restoration of and re- installation of Palm Springs first windmill. Funded by the $375,000 public art fee paid to the City in connection with the construction of NextEra’s large utility grade battery facility currently under construction and additional funding of approximately $200,000 donated in kind by Wintec Energy.

Palm Springs and the surrounding area is arguably becoming the renewable energy capital of California with its modern wind and solar facilities and now NextEra’s under construction largest battery project in California. The public interest in the history and future of wind energy has attracted large numbers of tourists and locals to visit the existing windmill energy museum currently located on the site of the Windmill Tour facility. This Project is conceived so that posterity will know how it all began, here in Palm Springs. The Museum and the surrounding art installation will be open to the public during regular business hours at no charge.

THE LOCATION
The artist’s array and the refurbished original windmill will be located adjacent to the site of the current Windmill Tour Facility and Museum, at the east entrance to the San Gorgonio Pass adjacent to Interstate 10 between Indian Canyon and Highway 62 at 62950 20
th Avenue, Palm Springs. The project will be adjacent to an existing outdoor exhibit area displaying many original windmills so that the evolution of design and size may be experienced.

THE PROPOSAL
The Project is being proposed by Desert Peak Energy and Wintec Energy, LTD. Desert Peak Energy proposes using the $375,000 Public Art Fee it recently paid to the City to help create the Project In addition to the Public Arts Fee Wintec Energy will underwrite the additional in kind expenses which are estimated to be approximately $200,000.

Item 3B - Page 31

That will include contributing land rights for the art displays, windmill blades and other artifacts, renewable energy exhibits and staffing.

Wintec Energy will also donate the original Carter 25kW Wind Turbine generator to the project. It is the first wind turbine installed in Palm Springs in 1982 and marks the start of wind energy in Palm Springs. It stood on a 80-foot pole and was held in place with guy wires along four compass points. The turbine is a valuable artifact because it stands in stark contrast to the surrounding wind turbines and acts as a clear example of the innovations achieved in harnessing wind energy. Of the over 200 such windmills installed in Palm Springs the Carter Wind Turbine is the only one left of that groundbreaking step in renewable energy. As new innovations in wind energy were developed the turbine became obsolete and preserved in storage since its removal in 1987. As part of the Project it will be restored to operating condition and reinstalled by local experts with knowledge of the windmill. Fortunately original operating and installation documents still exist in Wintec’s archives.

The project will also focus on creating and displaying an outdoor art exhibit made from repurposed wind turbine blades and other artifacts. An assortment of windmill blades ranging from 30 feet to 80 feet in length will be donated to the Project by Wintec and others. Local artists will be asked to bond their artistic vision to the blades to create art pieces dedicated to “save the planet”, “climate change”, “Palm Springs as a leader in green causes” and similar themes. Such a theme was pioneered on a single windmill blade currently located at the Palm Springs Art Museum in the heart of downtown Palm Springs. After completion, the blades will be installed both vertically, and in some cases horizontally, on concrete foundations and will form an attractive grouping of the artists’ work. The blades decorated by local artists and visible from the I-10 will be lit at night so that the quality of art is exhibited to all.

PROJECT MANAGEMENT
The overall Project will be managed by Wintec Energy under supervision of Desert Peak.

As such they will oversee the exhibits which will be curated by experts in the field of renewable energy. Blade art and artists will be supervised by the lead Artistic Director.

Item 3B - Page 32

TIMELINE
The timeline for the Project will commence upon allocation of funds of the Desert Peak mandatory Art fees. The overall timeline to complete the project will be approximately 270 days. The following list is anticipated timelines for each facet of the overall plan and the necessary requirements to complete the Project:
● Completing drawings for the schematics of the site. Leveling and preparing the site for foundations and utilities. Fencing the area for security of the artwork and other installations, pouring foundations and installing blades vertically. 180 days

● Moving from storage, restoring the Carter 25 kW windmill and placement on a new foundation: 120 days

● Locating sources and securing delivery of various surplus windmill blades: 60 days

● Preparation of blades for artists, cleaning and repainting as necessary: 30 to 45 days

(depending on how many blades are included.)

● Art creation start to finish, installation and lighting of blades, creation of signage and renewable energy exhibits: 180 days

● Completion of Project and opening date: 270 days

BUDGET
Restoration of Carter Wind Turbine, including, transporting to the site, Pouring new foundation and erection at the site. $275,000 Windmill blades (in kind donation). $ 50,000
Carter 25 kW windmill (in kind donation ). $100,000 Transportation of Windmill Blades, foundations and mounting. $ 50,000 Truck and crane rentals. $ 10,000
Artists’ honorarium, $ 20,000
Reserve Contingencies, $ 20,000
Project management (in kind donation), $ 15,000
Land rights, engineering permitting expense etc.(in kind). $ 35,000

TOTAL $575,000

Item 3B - Page 33

Item 3B - Page 34
CITY OF PALM SPRINGS – PUBLIC INTEGRITY DISCLOSURE

APPLICANT DISCLOSURE FORM

Page 1 of 2 ends

(Revised 05/16/19)

PUBLIC INTEGRITY DISCLOSURE

APPLICANT DISCLOSURE FORM

1. Name of Entity

2. Address of Entity (Principle Place of Business)

3. Local or California Address (if different than #2)

4. State where Entity is Registered with Secretary of State If other than California, is the Entity also registered in California? F Yes F No

5. Type of Entity
F Corporation F Limited Liability Company F Partnership F Trust F Other (please specify)

6. Officers, Directors, Members, Managers, Trustees, Other Fiduciaries (please specify) Note: If any response is not a natural person, please identify all officers, directors, members, managers and other fiduciaries for the member, manager, trust or other entity _________________________________________________ F Officer F Director F Member F Manager [name]
F General Partner F Limited Partner
F Other ____________________________________
_________________________________________________ F Officer F Director F Member F Manager [name]
F General Partner F Limited Partner
F Other ____________________________________
_________________________________________________ F Officer F Director F Member F Manager [name]
F General Partner F Limited Partner
F Other ____________________________________
Desert Peak Energy Center, LLC
700 Universe Blvd, Juno Beach, FL 33408
Delaware
✔
■
See attached list
■
Item 3B - Page 35
CITY OF PALM SPRINGS – PUBLIC INTEGRITY DISCLOSURE

APPLICANT DISCLOSURE FORM

Page 1 of 2 ends

(Revised 05/16/19)

7. Owners/Investors with a 5% beneficial intere st in the Applicant Entity or a related entity

EXAMPLE

JANE DOE
[name of owner/investor]
50%, ABC COMPANY, Inc.
[percentage of beneficial interest in entity
and name of entity]
A.
[name of owner/investor] [percentage of beneficial interest in entity and name of entity]
B.
[name of owner/investor] [percentage of beneficial interest in entity and name of entity]
C.
[name of owner/investor] [percentage of beneficial interest in entity and name of entity]
D.
[name of owner/investor] [percentage of beneficial interest in entity and name of entity]
E.
[name of owner/investor] [percentage of beneficial interest in entity and name of entity]

I DECLARE UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA THAT THE FOREGOING IS TRUE AND CORRECT.

Signature of Disclosing Party, Printed Name, Title Date

PENALTIES
Falsification of information or failure to report information required to be reported may subject you to administrative action by the City.
-RKQ'L'RQDWR9LFH3UHVLGHQW
ure of DDDDDDDDDDDisclosininininininnng ggggggggggggggggggggggggg PaPaPaPaaaart ''''''''''''''''''''''''''''LLLLLLLLLLLLLLLL 'R'R'R'R'''''''R'R'R'''''R'''''''R'R'R'''''''''''''''''''''''''' QDWR9LFH3UHV NextEra Energy, Inc. (indirect parent) 100% of Desert Peak Energy Center, LLC The Vanguard Group 9.12% of NextEra Energy, Inc.

BlackRock, Inc. 8.20% of NextEra Energy, Inc.

State Street Corporation 5.08% of NextEra Energy, Inc.

June 9, 2022
Item 3B - Page 36
I
JPPJ)i'
I I
I I
Officer List for:

Item 3B - Page 37
Deeert Peak Energy Center, UC
!Name
Rosko t, Matthew President
Beilhart , Kathy A. Vice President & Treasurer
Cutler, Paul I. Vice President
Di Donato, John Vice President
Handel, Matthew S. Vice President
Patten, Mark B. IV Vice President
Pedroni, Anthony Vice President
Priore, Carmine A. Ill Vice President
Rose, Kristin Longenecker Vice President
Scrima, Vincent J. Vice President
Witten, Lane S. Vice President
Anderson, Charlotte B. Secretary
Pear, Jason B. Assistant Sec retary
Balzano, Joseph Assistant Treasu rer
LaBar, Susan D. Assistant Treasurer
Portales, Aldo Assistant Treasu rer

CITY COUNCIL STAFF REPORT
03/09/2023
SUBJECT:

REQUEST TO ADD CHAPTER 5.89 TO THE PALM SPRINGS MUNICIPAL CODE RELATING TO SIDEWALK VENDING; AN AMENDMENT TO CHAPTER 5.48 RELATIVE TO COMMERCIAL SOLICITATION; AND AMENDMENTS TO CHAPTER

6.15 RELATING TO THE REGULATION OF MOBILE FOOD VENDING VEHICLES RECOMMENDATION:

Waive the reading of the ordinance text in its entirety and read by title only.1.

Introduce on first reading an Ordinance entitled, “AN ORDINANCE OF THE CITY OF PALM SPRINGS, CALIFORNIA, ADDING CHAPTER 5.89 TO THE

PALM SPRINGS MUNICIPAL CODE, ESTABLISHING REGULATIONS ON SIDEWALK VENDING IN COMPLIANCE WITH SENATE BILL 946; AN AMENDMENT TO CHAPTER 5.48 RELATIVE TO COMMERCIAL
SOLICITATION; AND AMENDMENTS TO CHAPTER 6.15 RELATIVE TO MOBILE FOOD VENDING VEHICLES.”

2. Attachments
Item 3C

CITY COUNCIL STAFF REPORT

DATE: MARCH 9, 2023 BUSINESS & LEGISLATIVE

SUBJECT: REQUEST TO ADD CHAPTER 5.89 TO THE PALM SPRINGS MUNICIPAL CODE RELATING TO SIDEWALK VENDING ; AN AMENDMENT TO
CHAPTER 5.48 RELATIVE TO COMMERCIAL SOLICITATION ; AND
AMENDMENTS TO CHAPTER 6.15 RELATING TO THE REGULATION

OF MOBILE FOOD VENDING VEHICLES

FROM: Teresa Gallavan, Interim City Manager

BY: Flinn Fagg, Deputy City Manager

SUMMARY:

This is a request to add Chapter 5.89 to the Palm Springs Municipal Code (PSMC) to establish regulations for sidewalk vending in residential and commercial neighborhoods.

In addition, it is proposed to amend PSMC Chapter 5.48 (Solicitation Commercial and Charitable) to distinguish sidewalk vending from the existing commercial solicitation regulations, and to amend PSMC Chapter 6.15 relating to the regulations for Mobile Food Vending Vehicles (food trucks). These topics were discussed at the City Council meeting of November 28, 2022; the draft ordinance included with this staff report incorporates regulations based on the direction provided by councilmembers at that meeting.

RECOMMENDATION:

1. Waive the reading of the ordinance text in its entirety and read by title only; and

2. Introduce on first reading Ordinance No. ____, “AN ORDINANCE OF THE CITY OF PALM SPRINGS, CALIFORNIA, ADDING CHAPTER 5.89 TO THE PALM

SPRINGS MUNICIPAL CODE, ESTABLISHING REGULATIONS ON SIDEWALK VENDING IN COMPLIANCE WITH SENATE BILL 946 ; AN AMENDMENT TO CHAPTER 5.48 RELATIVE TO COMMERCIAL SOLICITATION; AND
AMENDMENTS TO CHAPTER 6.15 RELATIVE TO MOBILE FOOD VENDING VEHICLES.”

BACKGROUND:

Senate Bill 946 (SB 946) was signed into law in 2018 and establishes protections for sidewalk vending activities. While municipalities may adopt regulations pertaining to Item 3C - Page 1
City Council Staff Report
March 9, 2023 -- Page 2
Sidewalk Vending/Mobile Food Vending Vehicle Ordinance

sidewalk vending, such regulations must be consistent with SB 946. The legislation includes the following:

• Prohibits cities from limiting the total number of sidewalk vendors. • Prohibits cities from imposing sidewalk vending regulations within specific parts of the public right-of-way or within certain neighborhoods or areas. • Cities cannot restrict or prohibit roaming sidewalk vendors but can restrict stationary sidewalk vendors from residential neighborhoods. • Prohibits cities from restricting sidewalk vending in public parks unless there is an exclusive concession agreement for the park; however, cities may impose restrictions on a concentration of vendors in parks where the activity unreasonably interferes with the scenic and natural character of the park. • Requires cities to cease criminal prosecution as an enforcement option for sidewalk vending violations but does allow the issuance of administrative citations. • Authorizes cities to adopt time, place and manner restrictions for sidewalk vending, provided those restrictions are directly related to objective health, safety or welfare concerns.
• Allows cities to require compliance with sanitary standards and regulations. • Authorizes cities to require a permit or business license for sidewalk vending activities.
• Allows cities to prohibit sidewalk vending from the vicinity of farmers ’ markets, swap meets, or temporary special events.

It is important to note that SB 946 applies only to public rights -of-way and public parks and does not apply to private property. Vending on private property is already addressed by the City’s zoning code, which allows the use upon approval of a Land Use Permit (approved administratively by staff).

The City’s Mobile Food Vending Vehicle Ordinance was adopted by City Council in 2015.

A moratorium had been adopted in March of 2014 in anticipation of modifications to the County of Riverside’s health regulations for food trucks. The City assembled a stakeholder group comprised of restaurant owners, Main Street representatives, and other downtown representatives to study the issue and review regulations from other municipalities. The recommendations of the stakeholder group informed the content of the ordinance that was eventually adopted by the City Council. The proposed modifications being considered as part of this agenda item will be the first major changes to the ordinance since its adoption.

STAFF ANALYSIS – SIDEWALK VENDING:

Sidewalk vending has grown in popularity in recent years with the protections that are now in place under State law. While SB 946 regulates sidewalk vending, municipalities may adopt their own regulations to address local issues provided such requirements are not more restrictive than allowed under State law. An initial draft ordinance was presented Item 3C - Page 2
City Council Staff Report
March 9, 2023 -- Page 3
Sidewalk Vending/Mobile Food Vending Vehicle Ordinance

to the City Council on November 28, 2022, at which time councilmembers provided direction to staff and requested additional research and public input.

The following summary provides an overview of the revised draft ordinance, which is included as Attachment A to this staff report:

• Licensing Requirements: It is proposed that sidewalk vendors will be required to obtain a City of Palm Springs business license and a California seller’s permit from the Department of Tax and Fee Administration. Those vendors that will be preparing or selling food products will need to obtain the appropriate permits from the County of Riverside Department of Environmental Health. • Zone Districts Where Permitted: Roaming sidewalk vendors may sell products in all zone districts; stationary vendors may set up on public sidewalks in all commercial and industrial zone districts. Stationary vendors would need to identify the specific location where they intend to set up as part of the business license application process.
• Location Requirements – General: Due to issues of public safety, sidewalk vendors may not set up within corner visibility areas at street intersections, nor may they locate within ten feet of fire hydrants, fire escapes, bus stops, handicapped parking spaces or access ramps, loading zones, or fire/police station driveways. Stationary vendors are also restricted from blocking entrances to buildings, blocking building windows, locating in private driveways, or locating in parking spaces.
• Location Requirements – Farmers Markets/Special Events: Consistent with State law, sidewalk vending would be prohibited within 500’ of farmers markets, swap meets, or temporary special events. Temporary special events include City - sponsored events such as VillageFest and parades, as well as private events where the organizer has secured approval from the City to close public rights -of- way.
• Location Requirements – Public Parks: The proposed ordinance would prohibit sidewalk vendors within parks that are less than two acres in size as a means to address overconcentration issues, while allowing vendors in the larger City parks.

In addition, it is proposed that sidewalk vendors be prohibited in parks where an exclusive concessionaire agreement is in place, unless they are vending merchandise that is different than that being offered by the concessionaire. • Sidewalk Clearance Requirement: It is proposed that sidewalk vendors maintain a minimum 48” clear pedestrian path on all sidewalks in order to comply with ADA requirements and provide adequate space for pedestrian circulation. • Operating Hours: It is proposed that roaming sidewalk vendors may operate in residential zones between the hours of 8:00am and 7:00pm; sidewalk vendors in commercial and industrial zones may operate between the hours of 8:00am and 12:00am.
• Shade Structures/Tables: Stationary sidewalk vendors may have one umbrella or tent structure, not to exceed 64 square feet, and may have one table or cart for Item 3C - Page 3
City Council Staff Report
March 9, 2023 -- Page 4
Sidewalk Vending/Mobile Food Vending Vehicle Ordinance

food service. Dining tables and chairs are not permitted. • Signage: The ordinance allows each stationary sidewalk vendor to have one sign of up to 16 square feet in area, or two signs of up to eight square feet in area each.

The sign(s) must be attached to the shade structure or table/cart , and cannot be freestanding so as reduce impediments in the public right-of-way. • Lighting/Amplified Sound: Vendors may have lighting, provided the lighting is downward directed and complies with the City’s outdoor lighting requirements.

Use of amplified sound by vendors is regulated by the City’s noise ordinance contained in PSMC Chapter 11.74.043(f).
• Smoke/Fire: Smoke and odors produced by cooking will be regulated by PSMC Chapter 6.08.020 (“Air Pollution”), which is intended to address public concerns. • Maintenance: Vendors must ke ep sidewalk areas clean and in a sanitary condition. Liquids such as water, beverages, grease, and oil shall not be discharged in the street, catch basins, or storm drains. Vendors shall not store merchandise in sidewalk areas.
• Sidewalk Vending Zones: It is proposed that designated sidewalk vending zones could be established, such as in public plaza or public park, where vendors would be encouraged to locate. The zones would be designated by a resolution of City Council and could include relaxed operational standards as there would not be the same safety concerns as vending in public rights-of-way.

To help illustrate the changes that have been made to the draft ordinance since the initial proposal in November 2022, the ordinance in Attachment A is provided in a strikeout/underlined version which is intended to show the changes that have been made since the initial discussion.

At the meeting of November 28, 2022, staff discussed three optional requirements related to public safety that had been recommended by the City Attorney:

• Requirement for stationary vendors to obtain an encroachment permit; • Requirement for vendors to maintain general liability insurance; and • Requirement for vendors to obtain a LiveScan report as part of the licensing process.

Based on the discussion by councilmembers, none of these requirements has been included in the current proposal.

In preparing the sidewalk vending ordinance, it has been identified that there is a potential conflict with the existing regulations pertaining to commercial and charitable solicitation contained in PSMC Chapter 5.48. In order to prevent confusion in the administration and enforcement of the ordinances, it is recommended that language be added to the definitions in Chapter 5.48 to identify that sidewalk vending is separate and distinct from commercial solicitation. The ordinance included as Attachment A includes this revised definition.

Item 3C - Page 4
City Council Staff Report
March 9, 2023 -- Page 5
Sidewalk Vending/Mobile Food Vending Vehicle Ordinance

STAFF ANALYSIS – MOBILE FOOD VENDING VEHICLES:

Based on City Council direction from the meeting of November 28, 2022, staff has drafted changes to PSMC Chapter 6.15, “Mobile Food Vending Vehicles” (food trucks). The majority of changes are related to the existing locational restrictions which significantly limit the areas where food truck operators may conduct business. Please note that mobile food trucks do not have the same protections under State law as are afforded to sidewalk vendors.

In addition to easing locational restrictions, the proposed revisions are intended to provide some parity with the regulations for sidewalk vendors. This includes extending the hours of operation for food trucks to match those of sidewalk vendors, and allowing food trucks in parks where an exclusive concession is not in place. The following table provides a summary of the proposed changes.

Regulation Existing Ordinance Proposed Ordinance
Commercial
Zones
Allowed in all commercial
zones, but prohibited in the
defined Downtown area.

Allowed in all commercial
zones; prohibited on Palm
Canyon between Ramon Road
and Vista Chino due to
congestion/on-street parking
issues. Additional restriction
added relative to blocking
business entrances, driveways,
or building windows.

Residential
Zones
Allowed in residential zones if a
customer has pre-ordered
goods.

No change.

Public Parks
Not allowed within 500’ of
public parks, except as part of
a special event.

Allowed in public parks, except
where an exclusive concession
is in place.

Schools
Not allowed within 500’ of
schools, unless as part of a
farmers’ market. Allowed on
school property upon approval
by school authority.

No change.

Private
Property
Allowed on private property
upon approval of a LUP. No change.

Farmers’ Markets/
Swap Meets
Allowed as part of a farmers’
market or swap meet. No change.

Street
Restrictions
Only permitted on streets
where the speed limit is less
than 35 mph.

Modified to allow on streets
where the speed limit is less
than 40 mph.

Item 3C - Page 5
City Council Staff Report
March 9, 2023 -- Page 6
Sidewalk Vending/Mobile Food Vending Vehicle Ordinance

Regulation Existing Ordinance Proposed Ordinance
Hours of
Operations
10/1 to 4/30: 9am – 5pm
5/1 to 9/30: 9am – 7pm
May operate between the hours
of 8am – 12am.

Licensing
Requirements
• Business license;
• Mobile Food Facility permit;
• Food handlers card.

No change.

The complete changes to the mobile food vending vehicles regulations are included in the draft resolution included as Attachment A to this staff report and are shown in strikeout/underlined formatting.

No modifications have been proposed to the licensing, inspection, or insurance requirements. Should the City Council wish to modify these requirements, staff will prepare the appropriate amendments for consideration at a future meeting.

ENVIRONMENTAL ASSESSMENT
:

The proposed Ordinance is not subject to the California Environmental Quality Act (“CEQA”) (Public Resources Code Section 21000 et seq.) pursuant to Section 15060(c)(2) of the State Guidelines, because the text amendment will not result in a direct or reasonably foreseeable indirect physical change in the environment and is not a “project” as that term is defined in Section 15378 of the State CEQA Guidelines.

FISCAL IMPACT
:

The proposed requirement for sidewalk vendors to obtain a business license will generate additional revenue for the City; however, this revenue will generally offset the additional staffing costs necessary to review and issue licenses and to enforce the or dinance. The relaxation of certain locational standards for food trucks may result in additional licensing revenue, which will also be offset by increased staff review and enforcement costs.

REVIEWED BY:

Deputy City Manager: Flinn Fagg
City Attorney: Jeffrey S. Ballinger
Interim City Manager: Teresa Gallavan

ATTACHMENTS:

A. Ordinance
B. Senate Bill 946
Item 3C - Page 6

ATTACHMENT A

Item 3C - Page 7
ORDINANCE NO. ____

AN ORDINANCE OF THE CITY OF PALM SPRINGS ,
CALIFORNIA, ADDING CHAPTER 5.89 TO THE PALM

SPRINGS MUNICIPAL CODE, ESTABLISHING

REGULATIONS ON SIDEWALK VENDING IN
COMPLIANCE WITH SENATE BILL 946 ; AN AMENDMENT
TO CHAPTER 5.48 RELATIVE TO COMMERCIAL
SOLICITATION; AND AMENDMENTS TO CHAPTER 6.15
RELATIVE TO MOBILE FOOD VENDING VEHICLES.

City Attorney’s Summary
The proposed ordinance adopts licensing and operational standards for sidewalk vendors pursuant to Senate Bill 946.

In addition, amendments to the City’s Mobile Food Vending Vehicle (food truck) ordinance are proposed to provide parity with the sidewalk vending regulations and encourage food truck businesses.

A. The City of Palm Springs, California (“City”) is a municipal corporation, duly organized under the California Constitution and laws of the State of California; and

B. P ursuant to the police powers delegated to it by the California Constitution, the City has the authority to enact laws which promote the public health, safety, and general welfare of its citizens, including sidewalk vending, as long as these are consistent with SB 946; and

C. I n 2018, the California Legislature passed SB 946 which prohibits cities from regulating sidewalk vendors, except in accordance with the provisions of SB 946; and

D. SB 946 states that it applies to both charter and general law cities; and

E. SB 946 authorizes the implementation of regulations that are directly related to objective health, safety, or welfare concerns, and that do not restrict sidewalk vendors to operate only in a designated neighborhood or area, except as specified; and

F. The permit requirements proposed are consistent with SB 946, as they are reasonable, related to objective health, safety, and welfare concerns, and are based upon compliance with other generally applicable laws including the Americans with Disabilities Act; and

G. The standards imposed on stationary sidewalk vendors requiring a minimum path of accessible travel are necessary to comply with the Americans with Disabilities Act and maintain minimum safe access along public sidewalks; and

H. Standards for maintaining access to building entrances, and not blocking Item 3C - Page 8
Ordinance No. _____

Page 2 ends

driveways, fire hydrants, parking areas and building storefront windows are necessary to guard the health and safety of patrons, drivers, vendors and existing business owners and promote fire suppression and law enforcement practices that allow the City’s safety personnel to observe activities within buildings and maintain access; and

I. The City Council finds and determines that the installation, repair, maintenance, and removal of encroachments in the public way must be regulated in order to protect the public health, safety, and welfare and to provide for the orderly administration and maintenance of the public access ways for the benefit of the community, while at the same time allowing reasonable accommodation and cooperative flexibility for providing necessary utility and other convenience services to the community; and

J. The City Council finds that public and private persons who maintain and/or install encroachments in the public way bear a responsibility to help preserve the public way and to contribute to the administrative and liability costs incurred by the community and caused by such encroachments; and

K. The City Council finds that, unless properly regulated, sidewalk vending poses a unique risk to the health, safety, and welfare of the public, including, but not limited to, impacts to traffic, pedestrian safety, mobility, unsanitary conditions involving food preparation, risks to children, and consumer protection; and

L. The inherent nature of sidewalk vending and the ability of such vendors to be located on private property and public streets and move quickly from place to place in the community, including near parks, schools, and other places frequented by children, warrants imposing certain regulatory measures to protect the health, safety, and welfare of the community; and

M. SB 946 continues to authorize cities to prohibit sidewalk vendors in areas located within the immediate vicinity of a permitted certified farmers market and a permitted swap meet, as specified, and to restrict or prohibit sidewalk vendors within the immediate vicinity of an area designated for a temporary special permit issued by a city; and

N. The City Council finds that, unless properly regulated, sidewalk vending in public parks may infringe on the use and enjoyment of the park, and regulations are necessary to prevent an undue concentration of commercial activity that interferes with the scenic and natural character of the park; and

O. Fraud or misrepresentation in the course of vending constitutes an objective harm to the health, safety, and welfare of the City’s residents; and

P. Fraud or misrepresentation in the application for the permit constitutes an objective harm to health, safety, and welfare of the City’s residents; and Item 3C - Page 9
Ordinance No. _____

Page 3 ends

Q. Vending in a manner that creates a public nuisance or constitutes a danger to the public constitutes an objective harm to the health, safety, and welfare of the City’s residents; and

R. The City Council finds that, unless properly regulated, mobile food vending vehicles pose a unique risk to the health, safety, and welfare of the public, including, but not limited to, impacts to traffic, pedestrian safety, unsanitary conditions involving food preparation, and consumer protection; and

S. The City Council also finds that, unless properly regulated, vending from mobile food vehicles in public parks may infringe on the use and enjoyment of the park, and regulations are necessary to prevent an undue concentration of commercial activity that interferes with the scenic and natural character of the park; and

T. Standards for mobile food vending vehicles relative to maintaining access to building entrances, and not blocking driveways, and building storefront windows are necessary to guard the health and safety of patrons, drivers, mobile food vendors and existing business owners and promote fire suppression and law enforcement practices that allow the City’s safety personnel to observe activities within buildings and maintain access.

THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY ORDAIN AS FOLLOWS:

SECTION 1
. That the findings and determinations reflected above are true and correct, and are incorporated by this reference herein as the cause and foundation for the action taken by the and through this Ordinance.

SECTION 2. Chapter 5.89 is hereby added to the Palm Springs Municipal Code to read as follows:

“Chapter 5.89 SIDEWALK VENDING.

Section 5.89.010 Purpose.

The City finds that the vending of prepared or pre- packaged foods, goods, and/or wares at semi -permanent locations on public sidewalks and rights -of-way may pose unsafe conditions and special dangers to the public health, safety, and welfare of residents a nd visitors. The purpose of this Chapter is to implement regulations on both roaming and stationary sidewalk vending that protect the public health, safety, and welfare of the community while complying with the requirements of general state law, as amended from time to time, to promote safe vending practices, prevent safety, traffic, and health hazards, and preserve the public peace, safety, and welfare of the community.

Item 3C - Page 10
Ordinance No. _____

Page 4 ends
← All documents from this meeting