Attachment C
Contractors Bid Documents

No. Bid Description QTY UOM Contractor Pricing
1A Mobilization 1 LS $160,000.00
2A Stormwater And Non-Stormwater Pollution Control 1 LS $35,000.00 3A Clearing And Grubbing 1 LS $220,000.00
4A Construction Surveying and Staking 1 LS $33,000.00
5A Temporary Traffic Control 1 LS $12,000.00
6A Tree Removal 4 EA $7,800.00
7A Tree Preservation 30 EA $22,500.00
8A Remove Existing Water Fountain 1 EA $5,000.00
9A Install 2" Water Tee 1 EA $2,500.00
10 A Install 2" Copper Potable Water Service Lateral 426 LF $85,200.00 11 A Install 22.5 Degree Bend 1 EA $350.00
12 A Install 45 Degree Bend 2 EA $700.00
13 A Install Drinking Fountains 3 EA $33,000.00
14 A Install Quick Coupler Valve 2 EA $1,700.00
15 A Install Gate Valve 2 EA $5,000.00
16 A Remove Existing Gate 22 LF $1,100.00
17 A Remove Existing Fence 1,650 LF $6,600.00
18 A Remove Site Improvements 1 LS $50,000.00
19 A Remove Existing Landscape and Irrigation 7,390 SF $7,390.00 20 A Sawcut and Remove Existing Curb and Gutter 280 LF $4,760.00 21 A Sawcut and Remove Asphalt Concrete 4,595 SF $27,570.00 22 A Sawcut and Remove Existing Sidewalk 120 SF $6,000.00 23 A Construct PCC Sidewalk (4" Thick) 18,318 SF $164,862.00 24 A Construct 4" AC Pavement 1,500 TON $232,500.00
25 A Construct 6" Concrete Curb 4,080 LF $134,640.00
26 A Construct Curb Ramp, Including Truncated Domes 4 EA $10,000.00 27 A Construct 8" Thick Concrete Cross Gutter 6,700 SF $100,500.00 28 A Construct Curb Inlet 2 EA $14,000.00
29 A Install 18" Reinforced Concrete Pipe 70 LF $33,600.00 30 A Install Rip-Rap 15 CY $5,700.00
31 A Construct Flared Headwall 2 EA $4,600.00
32 A Construct Class ll Aggregate Base 1,020 CY $100,980.00 33 A Trash Enclosure 1 LS $35,000.00
34 A Construct Concrete Trash Enclosure Approach 1,000 SF $18,000.00 35 A Install High Net Fencing 1 LS $175,000.00
36 A Install Signing and Striping 1 LS $29,000.00
37 A Unclassified Excavation (*F = Final Pay Item) 2,750 CY $145,750.00 38 A Install 6' Height Chainlink Fencing and Gates 65 LF $7,800.00 39 A Install 8' Height Perimeter Security Fencing and Gates 828 LF $78,660.00 40 A Install 8' Single Pedestrain Gate 4 EA $15,200.00
41 A Install 8' Maintenance Gate 1 EA $4,900.00
42 A Benches 8 EA $25,600.00
43 A Concrete Seat Wall 230 LF $98,900.00
44 A Table with Chairs 10 EA $70,500.00
45 A Trash Receptacles 3 EA $8,550.00
46 A Dog Waste Station 3 EA $2,250.00
47 A Shade Structures (Mariner Hexagon) 5 EA $260,000.00 48 A Shade Structures (Install) 1 LS $188,000.00
49 A Concrete Header Curb 1,030 LF $33,990.00
50 A 24" Box Tree 91 EA $38,675.00
51 A 5 Gallon Shrub 920 EA $30,360.00
52 A Boulder 39 EA $18,525.00
53 A Decomposed Granite 49,680 SF $149,040.00
54 A Sod 23,099 SF $32,107.61
55 A Root Barrier 2,485 LF $27,335.00
56 A Turf Seeding 3,160 SF $3,160.00
57 A Irrigation System (Overhead Spray and Drip Irrigation) 49,000 SF $157,290.00 Bid Results for City Project 21-16, Demuth Park Improvements Contractor: Zeco, Inc.

No. Bid Description QTY UOM Contractor Pricing
58 A 120 Day Maintenance Period for Landscape areas 1 LS $20,000.00 59 A Signage (Regulatory/Informational) 7 EA $3,850.00
60 A Pedestrian Lighting -Single Luminaire Poles (Poles, Fixtures, Foundations and Install) 30 EA $300,000.00 61 A Parking Lot Lighting-Single Luminaire (Poles, Fixtures, Foundation, and install) 24 EA $240,000.00 62 A Parking Lot Lighting- Double Luminaire Poles (Poles, Fixtures Foundations and install ) 14 EA $126,000.00 63 A 2" PVC Conduit (trench) 4,040 LF $133,320.00
64 A Lighting Conductors (#12) 14,355 LF $57,420.00
65 A #3 1/2 Pull Box, Traffic-Rated 72 EA $122,400.00
66 A #6 Pull Box, Traffic-Rated 2 EA $4,400.00
67 A Control Panel/Service Connection 3 EA $10,500.00
68 A Field Allowance 1 FA $350,000.00
$4,550,034.61
69 B Mobilization 1 LS $55,000.00
70 B Clearing and Grubbing 1 LS $85,000.00
71 B Construction Surveying and Staking 1 LS $20,000.00 72 B Install 2" Copper Potable Water Service Lateral 234 LF $23,400.00 73 B Install 2" Water Tee 1 EA $2,500.00
74 B Install Backflow Device 1 EA $20,000.00
75 B Install Water Meter 1 EA $15,000.00
76 B Install 90 Degree Bend 1 EA $1,000.00
77 B Install Sewer Lateral Saddle Connection 1 EA $1,000.00 78 B Install 6" VCP Sewer Pipe 37 LF $12,950.00
79 B Install 11.25 Degree VCP Bend 1 EA $1,000.00
80 B Install 45 Degree VCP Bend 1 EA $1,000.00
81 B Sawcut and Remove Existing Curb/Curb and Gutter 20 LF $300.00 82 B Sawcut and Remove Asphalt Concrete 50 SF $2,000.00 83 B Remove Existing Landscape/Vegetation 10,990 SF $8,792.00 84 B Remove Existing Water Fountains 12 EA $6,000.00
85 B Sawcut and Remove Concrete Sidewalk 220 SF $4,400.00 86 B Remove Catch Basin 1 EA $1,500.00
87 B Construct Bathroom 1 EA $490,000.00
88 B Construct PCC Sidewalk (4" thick) 2,460 SF $21,894.00 89 B Construct Curb Ramp, Including Truncated Domes 3 EA $8,400.00 90 B Construct Curb Inlet 2 EA $17,000.00
91 B Construct 6" Concrete Curb 80 LF $3,440.00
92 B Construct 4" Thick Concrete Pad 240 SF $2,400.00
93 B Unclassified Excavation (*F = Final Pay Item) 110 CY $7,150.00 94 B Install Drinking Fountains 8 EA $84,000.00
95 B Install 1" Service Line Connection 120 LF $3,000.00 96 B Constuct Stormchamber 2 EA $130,000.00
97 B Install Signing and Striping 1 LS $7,500.00
98 B Furnish and Install Infield Dirt 1,750 SF $7,000.00 99 B Decomposed Granite 5,700 SF $17,328.00
100 B Remove Existing Grass 5,700 SF $5,700.00
$1,065,654.00
101 C Mobilization 1 LS $50,000.00
102 C Clearing And Grubbing 1 LS $50,000.00
103 C Construction Surveying and Staking 1 LS $2,500.00 104 C Remove Existing Landscape/Vegetation and Irrigation 1,730 LF $10,380.00 105 C Sawcut and Remove Existing Curb/Curb and Gutter 1,080 LF $16,200.00 106 C Sawcut and Remove AC 50,350 SF $153,567.50
107 C Sawcut and Remove Existing Curb Ramp 370 SF $3,700.00 108 C Remove Existing Cross Gutter 600 SF $6,000.00
109 C Construct Curb Ramp 2 EA $10,000.00
110 C Construct 4" AC Pavement 1,260 TON $176,400.00
111 C Construct 8" Thick Cross Gutter 3,550 SF $50,055.00 112 C Trash Enclosure 1 LS $35,000.00
113 C Construct Concrete Trash Enclosure Approach 1,000 SF $16,000.00 114 C Install Signing and Striping 1 LS $20,000.00
115 C Construct 6" Concrete Curb 1,120 LF $36,176.00

BID SCHEDULE A SUBTOTAL

BID SCHEDULE B SUBTOTAL
No. Bid Description QTY UOM Contractor Pricing
116 C Construct Curb/Curb & Gutter 40 LF $2,168.00
117 C Install 18" Reinforced Concrete Pipe 52 LF $13,000.00 118 C Construct Flared Headwall 1 EA $5,000.00
119 C Install Rip-Rap 8 CY $8,000.00
120 C Unclassified Excavation (*F = Final Pay Item) 1,900 CY $102,600.00 121 C Construct Class ll Aggregate Base 935 CY $93,500.00 122 C Decomposed Granite 3,320 SF $10,126.00
123 C Turf Seeding 2,141 SF $2,569.20
124 C Install 3" Irrigation Line 190 LF $1,520.00
$874,461.70BID SCHEDULE C SUBTOTAL
TOTAL OF ALL BID SCHEDULES $6,490,150.31