Cities Index.
Attachment A - Heat Pump Water Heater Program Next Steps

Palo Alto City Council
November 13, 2023

Document
Attachment A - Heat Pump Water Heater Program Next Steps
Meeting
November 13, 2023
Body
Palo Alto City Council
Original file
1.3 MB
Text extracted from the city's file for reading and search. Open the original on cityofpaloalto.primegov.com. That file is the official record.

Heat Pump
Water Heater
Advanced Pilot:

Next Steps
S/CAP Committee
October 20, 2023
cityofpaloalto.org/ClimateAction Acting Now for a Resilient Future 2 2cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 2 Current Program Status
• Program Statistics (as of October 12, 2023):
– 571 signups
– 184 (32%) stopped responding or dropped out before getting an estimate – 100 more participants are still active, but are earlier in the process – 287 have received an estimate
– 148 of these (about 50%) chose to move forward, with 101 installs completed – In addition, 33 people managed their own install and received a rebate – TOTAL TO-DATE: 134 installs completed (with 47 more pending) • Insights:
– Challenges with staffing early in the program led to delays and dropouts – More post-estimate follow-up is needed to help people choose to move forward with their install - increase “take rate” from 50%

3 3cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 3 Current Program Status
• Recent performance (July through September)
– 8-9 average weekly new participants
– 4-5 weeks from signup to receiving an estimate, on average, for 2/3 of projects. • 1/3 of Jul-Sep signups do not have an estimate yet after 41 days (on average) – About 1/3 of participants are dropping out before receiving an estimate • Per program operator, this is a good dropout rate compared to other programs they run – Staff estimates this pace would result in 3-4 installs / week (about 150-200 per year, or 12% to 20% of all water heaters installed each year) • Insights
– Generating leads is the biggest challenge
– More work is needed on the participant intake process to reduce dropouts – Better post-estimate follow-up could also help

4 4cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 4 Current Program Status – Customer Satisfaction
• Of 118 confirmed dropouts from program start, reasons included:
– needed to move faster than program could accommodate (31 people) – cost (21 people)
– other (35 people)
– unknown reason (31 people)
• Post-install customer survey (about 20% response rate) – 100% cited the easiness of the program as their reason for participation – 80% said their experience with contractor was easy or very easy – High ratings for contractor quality, timeliness, and professionalism – 85% were satisfied or very satisfied with the value they got for what they paid

5 5cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 5 Current Program Status – Customer Satisfaction
• Cost may not be the primary driver – cost for those who moved forward not significantly different
1st Quartile
(cheapest
25%)
4th Quartile
(most costly
25%)
6 6cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 6 Electrification Outreach Plan Status
• Steadily ramping up. Implemented to-date:
– Utility bill inserts July, October
– Uplift Local, Utilities E-Newsletter, and Sustainability Newsletter outreach – Facebook and Instagram posts, social platform advertising – 350 Canvassing
– Google Ads – first set of ads to gauge which messages work best for each audience • Results: Doubled weekly signups (from 0-5 per week to 5-10 per week) • Upcoming outreach and resources:
– More bill inserts, newsletters, social posts and advertisements – Google Ads – Click to Call campaign and audience-targeted ad campaign using lessons learned in first run – Palo Alto Online advertising
– Community toolkit and student engagement
– Outreach at Development Center
– Gather testimonials from customer surveys

7 7cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 7 Current Program Status
• Lessons learned from pilot
– Marketing consultant has helped the City increase its leads through innovations like targeted Google Ads, for example
– Relying on a single installer has risks – consider this in future program design • Positive upcoming events that may drive more leads
– Lower pricing due to new State incentives
– Continued expansion of marketing efforts

8 8cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 8 Current Program Status
• Successes to-date
– Developed business process that can deliver about 150-200 installs / year • Higher participation rate than any previous energy program to-date – Achieved higher rate of signups than any previous program (35/month) – Developed new approaches to program outreach (e.g. targeted Google ads, audience segmentation, comprehensive, ongoing campaign themes)
• Challenges to-date
– Staff turnover early in the program with the City and its two program operators – Far more leads are needed to reach 20 installs per week (which represents 1000 installs per year, or 80% of water heaters replaced in Palo Alto each year) • With current dropout rates, 60 leads per week are needed • Lower numbers of leads would be needed with improvements in the dropout rate

9 9cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 9 Working Group and Ad Hoc Suggestions
• Find ways to integrate multiple contractors into the program • Explore more intensive use of 120V HPWH to reduce costs • Start an emergency replacement program
• Reach out to contractors to get more installers in Palo Alto • Look for regional partnerships on programs and contractor development • Advisory service with deep electrification expertise to help project design • Explore a leasing program
• Stay ahead of BAAQMD requirements / use them to spur action

10 10cityofpaloalto.org/ClimateAction Acting Now for A Resilient Future 1 0
Working Group and Ad Hoc Suggestions
• Outreach suggestions:
– Reach out to people with water heater permits from 10-15 years ago – Encourage people to provide the City their water heater’s serial number to find its age – Celebrate the 1000th HPWH installation
• Potential Next Step:
– In-person workshop to review lessons learned to date, upcoming actions already planned, and what other changes could be made

Thank You!