CITY COUNCIL
Regular Meeting
Monday, December 11, 2023
Council Chambers & Hybrid
5:30 PM
Amended Agenda
Amended agenda items in RED below
Palo Alto City Council meetings will be held as “hybrid” meetings with the option to attend by teleconference or in person. To maximize public safety while still maintaining transparency and public access, members of the public can choose to participate from home or attend in person.
Information on how the public may observe and participate in the meeting is located at the end of the agenda. Masks are strongly encouraged if attending in person. The meeting will be broadcast on Cable TV Channel 26, live on YouTube https://www.youtube.com/c/cityofpaloalto, and streamed to Midpen Media Center https://midpenmedia.org.
VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/362027238) Meeting ID: 362 027 238 Phone:1(669)900‐6833
PUBLIC COMMENTS
Public comments will be accepted both in person and via Zoom for up to three minutes or an amount of time determined by the Chair. All requests to speak will be taken until 5 minutes after the staff’s presentation. Written public comments can be submitted in advance to [email protected] and will be provided to the Council and available for inspection on the City’s website. Please clearly indicate which agenda item you are referencing in your subject line.
PowerPoints, videos, or other media to be presented during public comment are accepted only by email to [email protected] at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB’s or other physical electronic storage devices are not accepted.
TIME ESTIMATES
Listed times are estimates only and are subject to change at any time, including while the meeting is in progress. The Council reserves the right to use more or less time on any item, to change the order of items and/or to continue items to another meeting. Particular items may be heard before or after the time estimated on the agenda. This may occur in order to best manage the time at a meeting or to adapt to the participation of the public.
CALL TO ORDER
AGENDA CHANGES, ADDITIONS AND DELETIONS
PUBLIC COMMENT (5:30 ‐ 5:45 PM)
Members of the public may speak to any item NOT on the agenda. Council reserves the right to limit the duration of Oral Communications period to 30 minutes.
COUNCIL MEMBER QUESTIONS, COMMENTS, ANNOUNCEMENTS (5:45 ‐ 5:50 PM) Members of the public may not speak to the item(s).
CONSENT CALENDAR (5:50 ‐ 5:55 PM)
Items will be voted in one motion unless removed from the calendar by three Council Members.
1. Approval of Minutes from November 27, 2023 Meeting Supplemental Memo Added
2. Regional Water Quality Control Plant Joint Intercepting Sewer Rehabilitation Project Phase 1: Approval of Construction Contract, Construction Management Contract Amendment, and Addendum 12 to the Mountain View, Los Altos, and Palo Alto Agreement on Project Funding; CEQA status – Exempt under CEQA Guidelines Section 15301 (Repairs to Existing Facilities)
3. Approval of Contract Amendment Number 1 to Contract C23187506 with Momentum for Health to Extend Term by Eight (8) Months at No Additional Cost to the City, Revise the Not‐to‐Exceed Amount Down by $68,294 to $1,931,706 and Compensation Language, Provide Quarterly Invoicing, and Revise the Schedule of Rates; CEQA Status – Not a Project.
4. Adoption of an Ordinance Amending Chapters 4.10 (Licenses Obtained by Application to Chief of Police), 4.30 (Soliciting Funds), and Chapter 4.32 (Soliciting Information for Commercial Purposes); and Adding Chapter 4.12 to Title 4 (Business Licenses and Regulations) of the Palo Alto Municipal Code to Comply With Updates to the Law, Including 2018 Senate Bill 946 (Sidewalk Vendors). CEQA status – categorically exempt.
5. Adoption of an Urgency Ordinance and an Interim Ordinance That Allows the Director of Planning and Development Services to Extend Planning Entitlements for Housing Development Projects up to an Additional 18 Months. Environmental Review: Exempt from CEQA in Accordance with CEQA Guidelines 15061(b)(3).
6. SECOND READING: Adoption of an Ordinance Implementing Program 1.1A and 1.1B of the Housing Element, Including: 1) New Chapter 18.14: Housing Incentives, and 2) Modifications to Base Zoning Districts Throughout Title 18. Adoption of a Resolution Making Corresponding Changes to the Land Use and Design Element of the Comprehensive Plan. (FIRST READING: November 13, 2023 PASSED 5‐1‐1, Kou no, Veenker recused and PASSED 6‐1, Kou no)
CITY MANAGER COMMENTS (5:55 ‐ 6:10 PM)
BREAK (5‐10 MINUTES)
ACTION ITEMS (Item 7: 6:20 ‐ 7:20 PM, Item 8: 7:20 ‐ 9:00 PM, Item 9: 9:00 ‐ 9:30 PM, Item 10:
9:30 ‐ 9:45 PM)
Include: Report of Committees/Commissions, Ordinances and Resolutions, Public Hearings, Report of Officials, Unfinished Business and Council Matters.
7. LEGISLATIVE: Adopt Ordinances Amending Planned Community Ordinance 2343 for 2901‐ 2905 Middlefield Road and Establishing a Separate Planned Community Zoning Designation for 702 Ellsworth Place to Enable the Development of a new Single‐Story, Single‐Family Residence. CEQA Status ‐‐ Categorically Exempt Under CEQA Guidelines Sections 15061(b)(3), 15301, and 15303 (Continued from September 18 and November 6, 2023) Public Comment (Nov 6, 2023)
8. Direction to Pursue Development of New Parking and Refined Proposals for Housing in the University Avenue Downtown and Development Goals for Housing Investment. CEQA Status – Not a Project.
9. Adopt a Resolution Establishing the Council Annual Calendar of Meetings, Breaks and Council Events for the Calendar Year 2024.
10. Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment. CEQA Status ‐ Not a Project Supplemental Memo Added
ADJOURNMENT
INFORMATION REPORTS
Information reports are provided for informational purposes only to the Council and the public but are not listed for action during this meeting’s agenda.
11. Surveillance Technology Report for Fiscal Year 2023; CEQA Status – Not a Project OTHER INFORMATION
Standing Committee Meetings this week
Policy & Services Committee December 12, 2023
Policy & Services Committee December 13, 2023
City Schools Liaison Committee December 14, 2023
Public Comment Letters
Schedule of Meetings
AMENDED AGENDA ITEMS
1. Supplemental Memo ‐ Approval of Minutes from November 27, 2023 Meeting
10. Supplemental Memo ‐ Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment.
CEQA Status ‐ Not a Project
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email, teleconference, or by phone.
1. Written public comments may be submitted by email to [email protected].
2. For in person public comments please complete a speaker request card located on the table at the entrance to the Council Chambers and deliver it to the Clerk prior to discussion of the item.
3. Spoken public comments using a computer or smart phone will be accepted through the teleconference meeting. To address the Council, click on the link below to access a Zoom‐based meeting. Please read the following instructions carefully.
You may download the Zoom client or connect to the meeting in‐ browser. If using your browser, make sure you are using a current, up‐to‐date browser: Chrome 30 , Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in older browsers including Internet Explorer. Or download the Zoom application onto your smart phone from the Apple App Store or Google Play Store and enter in the Meeting ID below.
You may be asked to enter an email address and name. We request that you identify yourself by name as this will be visible online and will be used to notify you that it is your turn to speak.
When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will activate and unmute speakers in turn. Speakers will be notified shortly before they are called to speak.
When called, please limit your remarks to the time limit allotted. A timer will be shown on the computer to help keep track of your comments.
4. Spoken public comments using a phone use the telephone number listed below. When you wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will be asked to provide your first and last name before addressing the Council. You will be advised how long you have to speak. When called please limit your remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 362‐027‐238 Phone: 1‐669‐900‐6833 Americans with Disability Act (ADA) It is the policy of the City of Palo Alto to offer its public programs, services and meetings in a manner that is readily accessible to all. Persons with disabilities who require materials in an appropriate alternative format or who require auxiliary aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at (650) 329‐2550 (voice) or by emailing [email protected]. Requests for assistance or accommodations must be submitted at least 24 hours in advance of the meeting, program, or service.
1 Regular Meeting December 11, 2023
Materials submitted after distribution of the agenda packet are available for public inspection at
www.CityofPaloAlto.org/agendas
.
CITY COUNCIL
Regular Meeting
Monday, December 11, 2023
Council Chambers & Hybrid
5:30 PM
Amended Agenda
Amended agenda items in RED below
Palo Alto City Council meetings will be held as “hybrid” meetings with the option to attend by teleconference or in person. To maximize public safety while still maintaining transparency and public access, members of the public can choose to participate from home or attend in person.
Information on how the public may observe and participate in the meeting is located at the end of the agenda. Masks are strongly encouraged if attending in person. The meeting will be broadcast on Cable TV Channel 26, live on YouTube https://www.youtube.com/c/cityofpaloalto ,
and streamed to Midpen Media Center https://midpenmedia.org.
VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/362027238) Meeting ID: 362 027 238 Phone:1(669)900‐6833
PUBLIC COMMENTS
Public comments will be accepted both in person and via Zoom for up to three minutes or an amount of time determined by the Chair. All requests to speak will be taken until 5 minutes after the staff’s presentation. Written public comments can be submitted in advance to [email protected] and will be provided to the Council and available for inspection on the City’s website. Please clearly indicate which agenda item you are referencing in your subject line.
PowerPoints, videos, or other media to be presented during public comment are accepted only by email to [email protected] at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB’s or other physical electronic storage devices are not accepted.
TIME ESTIMATES
Listed times are estimates only and are subject to change at any time, including while the meeting is in progress. The Council reserves the right to use more or less time on any item, to change the order of items and/or to continue items to another meeting. Particular items may be heard before or after the time estimated on the agenda. This may occur in order to best manage the time at a meeting or to adapt to the participation of the public.
CALL TO ORDER
AGENDA CHANGES, ADDITIONS AND DELETIONS
PUBLIC COMMENT (5:30 ‐ 5:45 PM)
Members of the public may speak to any item NOT on the agenda. Council reserves the right to limit the duration of Oral Communications period to 30 minutes.
COUNCIL MEMBER QUESTIONS, COMMENTS, ANNOUNCEMENTS (5:45 ‐ 5:50 PM) Members of the public may not speak to the item(s).
CONSENT CALENDAR (5:50 ‐ 5:55 PM)
Items will be voted in one motion unless removed from the calendar by three Council Members.
1. Approval of Minutes from November 27, 2023 Meeting Supplemental Memo Added
2. Regional Water Quality Control Plant Joint Intercepting Sewer Rehabilitation Project Phase 1: Approval of Construction Contract, Construction Management Contract Amendment, and Addendum 12 to the Mountain View, Los Altos, and Palo Alto Agreement on Project Funding; CEQA status – Exempt under CEQA Guidelines Section 15301 (Repairs to Existing Facilities)
3. Approval of Contract Amendment Number 1 to Contract C23187506 with Momentum for Health to Extend Term by Eight (8) Months at No Additional Cost to the City, Revise the Not‐to‐Exceed Amount Down by $68,294 to $1,931,706 and Compensation Language, Provide Quarterly Invoicing, and Revise the Schedule of Rates; CEQA Status – Not a Project.
4. Adoption of an Ordinance Amending Chapters 4.10 (Licenses Obtained by Application to Chief of Police), 4.30 (Soliciting Funds), and Chapter 4.32 (Soliciting Information for Commercial Purposes); and Adding Chapter 4.12 to Title 4 (Business Licenses and Regulations) of the Palo Alto Municipal Code to Comply With Updates to the Law, Including 2018 Senate Bill 946 (Sidewalk Vendors). CEQA status – categorically exempt.
5. Adoption of an Urgency Ordinance and an Interim Ordinance That Allows the Director of Planning and Development Services to Extend Planning Entitlements for Housing Development Projects up to an Additional 18 Months. Environmental Review: Exempt from CEQA in Accordance with CEQA Guidelines 15061(b)(3).
6. SECOND READING: Adoption of an Ordinance Implementing Program 1.1A and 1.1B of the Housing Element, Including: 1) New Chapter 18.14: Housing Incentives, and 2) Modifications to Base Zoning Districts Throughout Title 18. Adoption of a Resolution Making Corresponding Changes to the Land Use and Design Element of the Comprehensive Plan. (FIRST READING: November 13, 2023 PASSED 5‐1‐1, Kou no, Veenker recused and PASSED 6‐1, Kou no)
CITY MANAGER COMMENTS (5:55 ‐ 6:10 PM)
BREAK (5‐10 MINUTES)
ACTION ITEMS (Item 7: 6:20 ‐ 7:20 PM, Item 8: 7:20 ‐ 9:00 PM, Item 9: 9:00 ‐ 9:30 PM, Item 10:
9:30 ‐ 9:45 PM)
Include: Report of Committees/Commissions, Ordinances and Resolutions, Public Hearings, Report of Officials, Unfinished Business and Council Matters.
7. LEGISLATIVE: Adopt Ordinances Amending Planned Community Ordinance 2343 for 2901‐ 2905 Middlefield Road and Establishing a Separate Planned Community Zoning Designation for 702 Ellsworth Place to Enable the Development of a new Single‐Story, Single‐Family Residence. CEQA Status ‐‐ Categorically Exempt Under CEQA Guidelines Sections 15061(b)(3), 15301, and 15303 (Continued from September 18 and November 6, 2023) Public Comment (Nov 6, 2023)
8. Direction to Pursue Development of New Parking and Refined Proposals for Housing in the University Avenue Downtown and Development Goals for Housing Investment. CEQA Status – Not a Project.
9. Adopt a Resolution Establishing the Council Annual Calendar of Meetings, Breaks and Council Events for the Calendar Year 2024.
10. Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment. CEQA Status ‐ Not a Project Supplemental Memo Added
ADJOURNMENT
INFORMATION REPORTS
Information reports are provided for informational purposes only to the Council and the public but are not listed for action during this meeting’s agenda.
11. Surveillance Technology Report for Fiscal Year 2023; CEQA Status – Not a Project OTHER INFORMATION
Standing Committee Meetings this week
Policy & Services Committee December 12, 2023
Policy & Services Committee December 13, 2023
City Schools Liaison Committee December 14, 2023
Public Comment Letters
Schedule of Meetings
AMENDED AGENDA ITEMS
1. Supplemental Memo ‐ Approval of Minutes from November 27, 2023 Meeting
10. Supplemental Memo ‐ Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment.
CEQA Status ‐ Not a Project
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email, teleconference, or by phone.
1. Written public comments may be submitted by email to [email protected].
2. For in person public comments please complete a speaker request card located on the table at the entrance to the Council Chambers and deliver it to the Clerk prior to discussion of the item.
3. Spoken public comments using a computer or smart phone will be accepted through the teleconference meeting. To address the Council, click on the link below to access a Zoom‐based meeting. Please read the following instructions carefully.
You may download the Zoom client or connect to the meeting in‐ browser. If using your browser, make sure you are using a current, up‐to‐date browser: Chrome 30 , Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in older browsers including Internet Explorer. Or download the Zoom application onto your smart phone from the Apple App Store or Google Play Store and enter in the Meeting ID below.
You may be asked to enter an email address and name. We request that you identify yourself by name as this will be visible online and will be used to notify you that it is your turn to speak.
When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will activate and unmute speakers in turn. Speakers will be notified shortly before they are called to speak.
When called, please limit your remarks to the time limit allotted. A timer will be shown on the computer to help keep track of your comments.
4. Spoken public comments using a phone use the telephone number listed below. When you wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will be asked to provide your first and last name before addressing the Council. You will be advised how long you have to speak. When called please limit your remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 362‐027‐238 Phone: 1‐669‐900‐6833 Americans with Disability Act (ADA)
It is the policy of the City of Palo Alto to offer its public programs, services and meetings in a manner that is readily accessible to all. Persons with disabilities who require materials in an appropriate alternative format or who require auxiliary aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at (650) 329‐2550 (voice) or by emailing [email protected]. Requests for assistance or accommodations must be submitted at least 24 hours in advance of the meeting, program, or service.
2 Regular Meeting December 11, 2023
Materials submitted after distribution of the agenda packet are available for public inspection at www.CityofPaloAlto.org/agendas.
CITY COUNCIL
Regular Meeting
Monday, December 11, 2023
Council Chambers & Hybrid
5:30 PM
Amended Agenda
Amended agenda items in RED below
Palo Alto City Council meetings will be held as “hybrid” meetings with the option to attend by teleconference or in person. To maximize public safety while still maintaining transparency and public access, members of the public can choose to participate from home or attend in person.
Information on how the public may observe and participate in the meeting is located at the end of the agenda. Masks are strongly encouraged if attending in person. The meeting will be broadcast on Cable TV Channel 26, live on YouTube https://www.youtube.com/c/cityofpaloalto ,
and streamed to Midpen Media Center https://midpenmedia.org.
VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/362027238) Meeting ID: 362 027 238 Phone:1(669)900‐6833
PUBLIC COMMENTS
Public comments will be accepted both in person and via Zoom for up to three minutes or an amount of time determined by the Chair. All requests to speak will be taken until 5 minutes after the staff’s presentation. Written public comments can be submitted in advance to [email protected] and will be provided to the Council and available for inspection on the City’s website. Please clearly indicate which agenda item you are referencing in your subject line.
PowerPoints, videos, or other media to be presented during public comment are accepted only by email to [email protected] at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB’s or other physical electronic storage devices are not accepted.
TIME ESTIMATES
Listed times are estimates only and are subject to change at any time, including while the meeting is in progress. The Council reserves the right to use more or less time on any item, to change the order of items and/or to continue items to another meeting. Particular items may be heard before or after the time estimated on the agenda. This may occur in order to best manage the time at a meeting or to adapt to the participation of the public.
CALL TO ORDER
AGENDA CHANGES, ADDITIONS AND DELETIONS
PUBLIC COMMENT (5:30 ‐ 5:45 PM)
Members of the public may speak to any item NOT on the agenda. Council reserves the right to limit the duration of Oral Communications period to 30 minutes.
COUNCIL MEMBER QUESTIONS, COMMENTS, ANNOUNCEMENTS (5:45 ‐ 5:50 PM) Members of the public may not speak to the item(s).
CONSENT CALENDAR (5:50 ‐ 5:55 PM)
Items will be voted in one motion unless removed from the calendar by three Council Members.
1. Approval of Minutes from November 27, 2023 Meeting Supplemental Memo Added
2. Regional Water Quality Control Plant Joint Intercepting Sewer Rehabilitation Project Phase 1: Approval of Construction Contract, Construction Management Contract Amendment, and Addendum 12 to the Mountain View, Los Altos, and Palo Alto Agreement on Project Funding; CEQA status – Exempt under CEQA Guidelines Section 15301 (Repairs to Existing Facilities)
3. Approval of Contract Amendment Number 1 to Contract C23187506 with Momentum for Health to Extend Term by Eight (8) Months at No Additional Cost to the City, Revise the Not‐to‐Exceed Amount Down by $68,294 to $1,931,706 and Compensation Language, Provide Quarterly Invoicing, and Revise the Schedule of Rates; CEQA Status – Not a Project.
4. Adoption of an Ordinance Amending Chapters 4.10 (Licenses Obtained by Application to Chief of Police), 4.30 (Soliciting Funds), and Chapter 4.32 (Soliciting Information for Commercial Purposes); and Adding Chapter 4.12 to Title 4 (Business Licenses and Regulations) of the Palo Alto Municipal Code to Comply With Updates to the Law, Including 2018 Senate Bill 946 (Sidewalk Vendors). CEQA status – categorically exempt.
5. Adoption of an Urgency Ordinance and an Interim Ordinance That Allows the Director of Planning and Development Services to Extend Planning Entitlements for Housing Development Projects up to an Additional 18 Months. Environmental Review: Exempt from CEQA in Accordance with CEQA Guidelines 15061(b)(3).
6. SECOND READING: Adoption of an Ordinance Implementing Program 1.1A and 1.1B of the Housing Element, Including: 1) New Chapter 18.14: Housing Incentives, and 2) Modifications to Base Zoning Districts Throughout Title 18. Adoption of a Resolution Making Corresponding Changes to the Land Use and Design Element of the Comprehensive Plan. (FIRST READING: November 13, 2023 PASSED 5‐1‐1, Kou no, Veenker recused and PASSED 6‐1, Kou no)
CITY MANAGER COMMENTS (5:55 ‐ 6:10 PM)
BREAK (5‐10 MINUTES)
ACTION ITEMS (Item 7: 6:20 ‐ 7:20 PM, Item 8: 7:20 ‐ 9:00 PM, Item 9: 9:00 ‐ 9:30 PM, Item 10:
9:30 ‐ 9:45 PM)
Include: Report of Committees/Commissions, Ordinances and Resolutions, Public Hearings, Report of Officials, Unfinished Business and Council Matters.
7. LEGISLATIVE: Adopt Ordinances Amending Planned Community Ordinance 2343 for 2901‐ 2905 Middlefield Road and Establishing a Separate Planned Community Zoning Designation for 702 Ellsworth Place to Enable the Development of a new Single‐Story, Single‐Family Residence. CEQA Status ‐‐ Categorically Exempt Under CEQA Guidelines Sections 15061(b)(3), 15301, and 15303 (Continued from September 18 and November 6, 2023) Public Comment (Nov 6, 2023)
8. Direction to Pursue Development of New Parking and Refined Proposals for Housing in the University Avenue Downtown and Development Goals for Housing Investment. CEQA Status – Not a Project.
9. Adopt a Resolution Establishing the Council Annual Calendar of Meetings, Breaks and Council Events for the Calendar Year 2024.
10. Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment. CEQA Status ‐ Not a Project Supplemental Memo Added
ADJOURNMENT
INFORMATION REPORTS
Information reports are provided for informational purposes only to the Council and the public but are not listed for action during this meeting’s agenda.
11. Surveillance Technology Report for Fiscal Year 2023; CEQA Status – Not a Project OTHER INFORMATION
Standing Committee Meetings this week
Policy & Services Committee December 12, 2023
Policy & Services Committee December 13, 2023
City Schools Liaison Committee December 14, 2023
Public Comment Letters
Schedule of Meetings
AMENDED AGENDA ITEMS
1. Supplemental Memo ‐ Approval of Minutes from November 27, 2023 Meeting
10. Supplemental Memo ‐ Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment.
CEQA Status ‐ Not a Project
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email, teleconference, or by phone.
1. Written public comments may be submitted by email to [email protected].
2. For in person public comments please complete a speaker request card located on the table at the entrance to the Council Chambers and deliver it to the Clerk prior to discussion of the item.
3. Spoken public comments using a computer or smart phone will be accepted through the teleconference meeting. To address the Council, click on the link below to access a Zoom‐based meeting. Please read the following instructions carefully.
You may download the Zoom client or connect to the meeting in‐ browser. If using your browser, make sure you are using a current, up‐to‐date browser: Chrome 30 , Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in older browsers including Internet Explorer. Or download the Zoom application onto your smart phone from the Apple App Store or Google Play Store and enter in the Meeting ID below.
You may be asked to enter an email address and name. We request that you identify yourself by name as this will be visible online and will be used to notify you that it is your turn to speak.
When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will activate and unmute speakers in turn. Speakers will be notified shortly before they are called to speak.
When called, please limit your remarks to the time limit allotted. A timer will be shown on the computer to help keep track of your comments.
4. Spoken public comments using a phone use the telephone number listed below. When you wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will be asked to provide your first and last name before addressing the Council. You will be advised how long you have to speak. When called please limit your remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 362‐027‐238 Phone: 1‐669‐900‐6833 Americans with Disability Act (ADA)
It is the policy of the City of Palo Alto to offer its public programs, services and meetings in a manner that is readily accessible to all. Persons with disabilities who require materials in an appropriate alternative format or who require auxiliary aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at (650) 329‐2550 (voice) or by emailing [email protected]. Requests for assistance or accommodations must be submitted at least 24 hours in advance of the meeting, program, or service.
3 Regular Meeting December 11, 2023
Materials submitted after distribution of the agenda packet are available for public inspection at
www.CityofPaloAlto.org/agendas
.
CITY COUNCIL
Regular Meeting
Monday, December 11, 2023
Council Chambers & Hybrid
5:30 PM
Amended Agenda
Amended agenda items in RED below
Palo Alto City Council meetings will be held as “hybrid” meetings with the option to attend by teleconference or in person. To maximize public safety while still maintaining transparency and public access, members of the public can choose to participate from home or attend in person.
Information on how the public may observe and participate in the meeting is located at the end of the agenda. Masks are strongly encouraged if attending in person. The meeting will be broadcast on Cable TV Channel 26, live on YouTube https://www.youtube.com/c/cityofpaloalto ,
and streamed to Midpen Media Center https://midpenmedia.org.
VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/362027238) Meeting ID: 362 027 238 Phone:1(669)900‐6833
PUBLIC COMMENTS
Public comments will be accepted both in person and via Zoom for up to three minutes or an amount of time determined by the Chair. All requests to speak will be taken until 5 minutes after the staff’s presentation. Written public comments can be submitted in advance to [email protected] and will be provided to the Council and available for inspection on the City’s website. Please clearly indicate which agenda item you are referencing in your subject line.
PowerPoints, videos, or other media to be presented during public comment are accepted only by email to [email protected] at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB’s or other physical electronic storage devices are not accepted.
TIME ESTIMATES
Listed times are estimates only and are subject to change at any time, including while the meeting is in progress. The Council reserves the right to use more or less time on any item, to change the order of items and/or to continue items to another meeting. Particular items may be heard before or after the time estimated on the agenda. This may occur in order to best manage the time at a meeting or to adapt to the participation of the public.
CALL TO ORDER
AGENDA CHANGES, ADDITIONS AND DELETIONS
PUBLIC COMMENT (5:30 ‐ 5:45 PM)
Members of the public may speak to any item NOT on the agenda. Council reserves the right to limit the duration of Oral Communications period to 30 minutes.
COUNCIL MEMBER QUESTIONS, COMMENTS, ANNOUNCEMENTS (5:45 ‐ 5:50 PM) Members of the public may not speak to the item(s).
CONSENT CALENDAR (5:50 ‐ 5:55 PM)
Items will be voted in one motion unless removed from the calendar by three Council Members.
1. Approval of Minutes from November 27, 2023 Meeting Supplemental Memo Added
2. Regional Water Quality Control Plant Joint Intercepting Sewer Rehabilitation Project Phase 1: Approval of Construction Contract, Construction Management Contract Amendment, and Addendum 12 to the Mountain View, Los Altos, and Palo Alto Agreement on Project Funding; CEQA status – Exempt under CEQA Guidelines Section 15301 (Repairs to Existing Facilities)
3. Approval of Contract Amendment Number 1 to Contract C23187506 with Momentum for Health to Extend Term by Eight (8) Months at No Additional Cost to the City, Revise the Not‐to‐Exceed Amount Down by $68,294 to $1,931,706 and Compensation Language, Provide Quarterly Invoicing, and Revise the Schedule of Rates; CEQA Status – Not a Project.
4. Adoption of an Ordinance Amending Chapters 4.10 (Licenses Obtained by Application to Chief of Police), 4.30 (Soliciting Funds), and Chapter 4.32 (Soliciting Information for Commercial Purposes); and Adding Chapter 4.12 to Title 4 (Business Licenses and Regulations) of the Palo Alto Municipal Code to Comply With Updates to the Law, Including 2018 Senate Bill 946 (Sidewalk Vendors). CEQA status – categorically exempt.
5. Adoption of an Urgency Ordinance and an Interim Ordinance That Allows the Director of Planning and Development Services to Extend Planning Entitlements for Housing Development Projects up to an Additional 18 Months. Environmental Review: Exempt from CEQA in Accordance with CEQA Guidelines 15061(b)(3).
6. SECOND READING: Adoption of an Ordinance Implementing Program 1.1A and 1.1B of the Housing Element, Including: 1) New Chapter 18.14: Housing Incentives, and 2) Modifications to Base Zoning Districts Throughout Title 18. Adoption of a Resolution Making Corresponding Changes to the Land Use and Design Element of the Comprehensive Plan. (FIRST READING: November 13, 2023 PASSED 5‐1‐1, Kou no, Veenker recused and PASSED 6‐1, Kou no)
CITY MANAGER COMMENTS (5:55 ‐ 6:10 PM)
BREAK (5‐10 MINUTES)
ACTION ITEMS (Item 7: 6:20 ‐ 7:20 PM, Item 8: 7:20 ‐ 9:00 PM, Item 9: 9:00 ‐ 9:30 PM, Item 10:
9:30 ‐ 9:45 PM)
Include: Report of Committees/Commissions, Ordinances and Resolutions, Public Hearings, Report of Officials, Unfinished Business and Council Matters.
7. LEGISLATIVE: Adopt Ordinances Amending Planned Community Ordinance 2343 for 2901‐ 2905 Middlefield Road and Establishing a Separate Planned Community Zoning Designation for 702 Ellsworth Place to Enable the Development of a new Single‐Story, Single‐Family Residence. CEQA Status ‐‐ Categorically Exempt Under CEQA Guidelines Sections 15061(b)(3), 15301, and 15303 (Continued from September 18 and November 6, 2023) Public Comment (Nov 6, 2023)
8. Direction to Pursue Development of New Parking and Refined Proposals for Housing in the University Avenue Downtown and Development Goals for Housing Investment. CEQA Status – Not a Project.
9. Adopt a Resolution Establishing the Council Annual Calendar of Meetings, Breaks and Council Events for the Calendar Year 2024.
10. Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment. CEQA Status ‐ Not a Project Supplemental Memo Added
ADJOURNMENT
INFORMATION REPORTS
Information reports are provided for informational purposes only to the Council and the public but are not listed for action during this meeting’s agenda.
11. Surveillance Technology Report for Fiscal Year 2023; CEQA Status – Not a Project OTHER INFORMATION
Standing Committee Meetings this week
Policy & Services Committee December 12, 2023
Policy & Services Committee December 13, 2023
City Schools Liaison Committee December 14, 2023
Public Comment Letters
Schedule of Meetings
AMENDED AGENDA ITEMS
1. Supplemental Memo ‐ Approval of Minutes from November 27, 2023 Meeting
10. Supplemental Memo ‐ Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment.
CEQA Status ‐ Not a Project
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email, teleconference, or by phone.
1. Written public comments may be submitted by email to [email protected].
2. For in person public comments please complete a speaker request card located on the table at the entrance to the Council Chambers and deliver it to the Clerk prior to discussion of the item.
3. Spoken public comments using a computer or smart phone will be accepted through the teleconference meeting. To address the Council, click on the link below to access a Zoom‐based meeting. Please read the following instructions carefully.
You may download the Zoom client or connect to the meeting in‐ browser. If using your browser, make sure you are using a current, up‐to‐date browser: Chrome 30 , Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in older browsers including Internet Explorer. Or download the Zoom application onto your smart phone from the Apple App Store or Google Play Store and enter in the Meeting ID below.
You may be asked to enter an email address and name. We request that you identify yourself by name as this will be visible online and will be used to notify you that it is your turn to speak.
When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will activate and unmute speakers in turn. Speakers will be notified shortly before they are called to speak.
When called, please limit your remarks to the time limit allotted. A timer will be shown on the computer to help keep track of your comments.
4. Spoken public comments using a phone use the telephone number listed below. When you wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will be asked to provide your first and last name before addressing the Council. You will be advised how long you have to speak. When called please limit your remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 362‐027‐238 Phone: 1‐669‐900‐6833 Americans with Disability Act (ADA)
It is the policy of the City of Palo Alto to offer its public programs, services and meetings in a manner that is readily accessible to all. Persons with disabilities who require materials in an appropriate alternative format or who require auxiliary aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at (650) 329‐2550 (voice) or by emailing [email protected]. Requests for assistance or accommodations must be submitted at least 24 hours in advance of the meeting, program, or service.
4 Regular Meeting December 11, 2023
Materials submitted after distribution of the agenda packet are available for public inspection at
www.CityofPaloAlto.org/agendas
.
CITY COUNCIL
Regular Meeting
Monday, December 11, 2023
Council Chambers & Hybrid
5:30 PM
Amended Agenda
Amended agenda items in RED below
Palo Alto City Council meetings will be held as “hybrid” meetings with the option to attend by teleconference or in person. To maximize public safety while still maintaining transparency and public access, members of the public can choose to participate from home or attend in person.
Information on how the public may observe and participate in the meeting is located at the end of the agenda. Masks are strongly encouraged if attending in person. The meeting will be broadcast on Cable TV Channel 26, live on YouTube https://www.youtube.com/c/cityofpaloalto ,
and streamed to Midpen Media Center https://midpenmedia.org.
VIRTUAL PARTICIPATION CLICK HERE TO JOIN (https://cityofpaloalto.zoom.us/j/362027238) Meeting ID: 362 027 238 Phone:1(669)900‐6833
PUBLIC COMMENTS
Public comments will be accepted both in person and via Zoom for up to three minutes or an amount of time determined by the Chair. All requests to speak will be taken until 5 minutes after the staff’s presentation. Written public comments can be submitted in advance to [email protected] and will be provided to the Council and available for inspection on the City’s website. Please clearly indicate which agenda item you are referencing in your subject line.
PowerPoints, videos, or other media to be presented during public comment are accepted only by email to [email protected] at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB’s or other physical electronic storage devices are not accepted.
TIME ESTIMATES
Listed times are estimates only and are subject to change at any time, including while the meeting is in progress. The Council reserves the right to use more or less time on any item, to change the order of items and/or to continue items to another meeting. Particular items may be heard before or after the time estimated on the agenda. This may occur in order to best manage the time at a meeting or to adapt to the participation of the public.
CALL TO ORDER
AGENDA CHANGES, ADDITIONS AND DELETIONS
PUBLIC COMMENT (5:30 ‐ 5:45 PM)
Members of the public may speak to any item NOT on the agenda. Council reserves the right to limit the duration of Oral Communications period to 30 minutes.
COUNCIL MEMBER QUESTIONS, COMMENTS, ANNOUNCEMENTS (5:45 ‐ 5:50 PM) Members of the public may not speak to the item(s).
CONSENT CALENDAR (5:50 ‐ 5:55 PM)
Items will be voted in one motion unless removed from the calendar by three Council Members.
1. Approval of Minutes from November 27, 2023 Meeting Supplemental Memo Added
2. Regional Water Quality Control Plant Joint Intercepting Sewer Rehabilitation Project Phase 1: Approval of Construction Contract, Construction Management Contract Amendment, and Addendum 12 to the Mountain View, Los Altos, and Palo Alto Agreement on Project Funding; CEQA status – Exempt under CEQA Guidelines Section 15301 (Repairs to Existing Facilities)
3. Approval of Contract Amendment Number 1 to Contract C23187506 with Momentum for Health to Extend Term by Eight (8) Months at No Additional Cost to the City, Revise the Not‐to‐Exceed Amount Down by $68,294 to $1,931,706 and Compensation Language, Provide Quarterly Invoicing, and Revise the Schedule of Rates; CEQA Status – Not a Project.
4. Adoption of an Ordinance Amending Chapters 4.10 (Licenses Obtained by Application to Chief of Police), 4.30 (Soliciting Funds), and Chapter 4.32 (Soliciting Information for Commercial Purposes); and Adding Chapter 4.12 to Title 4 (Business Licenses and Regulations) of the Palo Alto Municipal Code to Comply With Updates to the Law, Including 2018 Senate Bill 946 (Sidewalk Vendors). CEQA status – categorically exempt.
5. Adoption of an Urgency Ordinance and an Interim Ordinance That Allows the Director of Planning and Development Services to Extend Planning Entitlements for Housing Development Projects up to an Additional 18 Months. Environmental Review: Exempt from CEQA in Accordance with CEQA Guidelines 15061(b)(3).
6. SECOND READING: Adoption of an Ordinance Implementing Program 1.1A and 1.1B of the Housing Element, Including: 1) New Chapter 18.14: Housing Incentives, and 2) Modifications to Base Zoning Districts Throughout Title 18. Adoption of a Resolution Making Corresponding Changes to the Land Use and Design Element of the Comprehensive Plan. (FIRST READING: November 13, 2023 PASSED 5‐1‐1, Kou no, Veenker recused and PASSED 6‐1, Kou no)
CITY MANAGER COMMENTS (5:55 ‐ 6:10 PM)
BREAK (5‐10 MINUTES)
ACTION ITEMS (Item 7: 6:20 ‐ 7:20 PM, Item 8: 7:20 ‐ 9:00 PM, Item 9: 9:00 ‐ 9:30 PM, Item 10:
9:30 ‐ 9:45 PM)
Include: Report of Committees/Commissions, Ordinances and Resolutions, Public Hearings, Report of Officials, Unfinished Business and Council Matters.
7. LEGISLATIVE: Adopt Ordinances Amending Planned Community Ordinance 2343 for 2901‐ 2905 Middlefield Road and Establishing a Separate Planned Community Zoning Designation for 702 Ellsworth Place to Enable the Development of a new Single‐Story, Single‐Family Residence. CEQA Status ‐‐ Categorically Exempt Under CEQA Guidelines Sections 15061(b)(3), 15301, and 15303 (Continued from September 18 and November 6, 2023) Public Comment (Nov 6, 2023)
8. Direction to Pursue Development of New Parking and Refined Proposals for Housing in the University Avenue Downtown and Development Goals for Housing Investment. CEQA Status – Not a Project.
9. Adopt a Resolution Establishing the Council Annual Calendar of Meetings, Breaks and Council Events for the Calendar Year 2024.
10. Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment. CEQA Status ‐ Not a Project Supplemental Memo Added
ADJOURNMENT
INFORMATION REPORTS
Information reports are provided for informational purposes only to the Council and the public but are not listed for action during this meeting’s agenda.
11. Surveillance Technology Report for Fiscal Year 2023; CEQA Status – Not a Project OTHER INFORMATION
Standing Committee Meetings this week
Policy & Services Committee December 12, 2023
Policy & Services Committee December 13, 2023
City Schools Liaison Committee December 14, 2023
Public Comment Letters
Schedule of Meetings
AMENDED AGENDA ITEMS
1. Supplemental Memo ‐ Approval of Minutes from November 27, 2023 Meeting
10. Supplemental Memo ‐ Approval of Amendments to the Employment Agreements between the City of Palo Alto and Council Appointed Officers, specifically the City Manager, and City Attorney and Adoption of Amended Resolution Amending Appointment Term for Interim City Clerk through March 31, 2024 and salary adjustment.
CEQA Status ‐ Not a Project
PUBLIC COMMENT INSTRUCTIONS
Members of the Public may provide public comments to teleconference meetings via email, teleconference, or by phone.
1. Written public comments may be submitted by email to [email protected].
2. For in person public comments please complete a speaker request card located on the table at the entrance to the Council Chambers and deliver it to the Clerk prior to discussion of the item.
3. Spoken public comments using a computer or smart phone will be accepted through the teleconference meeting. To address the Council, click on the link below to access a Zoom‐based meeting. Please read the following instructions carefully.
You may download the Zoom client or connect to the meeting in‐ browser. If using your browser, make sure you are using a current, up‐to‐date browser: Chrome 30 , Firefox 27 , Microsoft Edge 12 , Safari 7 . Certain functionality may be disabled in older browsers including Internet Explorer. Or download the Zoom application onto your smart phone from the Apple App Store or Google Play Store and enter in the Meeting ID below.
You may be asked to enter an email address and name. We request that you identify yourself by name as this will be visible online and will be used to notify you that it is your turn to speak.
When you wish to speak on an Agenda Item, click on “raise hand.” The Clerk will activate and unmute speakers in turn. Speakers will be notified shortly before they are called to speak.
When called, please limit your remarks to the time limit allotted. A timer will be shown on the computer to help keep track of your comments.
4. Spoken public comments using a phone use the telephone number listed below. When you wish to speak on an agenda item hit *9 on your phone so we know that you wish to speak. You will be asked to provide your first and last name before addressing the Council. You will be advised how long you have to speak. When called please limit your remarks to the agenda item and time limit allotted.
CLICK HERE TO JOIN Meeting ID: 362‐027‐238 Phone: 1‐669‐900‐6833 Americans with Disability Act (ADA)
It is the policy of the City of Palo Alto to offer its public programs, services and meetings in a manner that is readily accessible to all. Persons with disabilities who require materials in an appropriate alternative format or who require auxiliary aids to access City meetings, programs, or services may contact the City’s ADA Coordinator at (650) 329‐2550 (voice) or by emailing [email protected]. Requests for assistance or accommodations must be submitted at least 24 hours in advance of the meeting, program, or service.
5 Regular Meeting December 11, 2023
Materials submitted after distribution of the agenda packet are available for public inspection at
www.CityofPaloAlto.org/agendas
.
City Council
Staff Report
Report Type: CONSENT CALENDAR
Lead Department: City Clerk
Meeting Date: December 11, 2023
Report #:2311-2290
TITLE
Approval of Minutes from November 27, 2023 Meeting
RECOMMENDATION
That the minutes be reviewed and approved.
ATTACHMENTS
Attachment A: November 27, 2023 Draft Action Minutes
APPROVED BY:
Mahealani Ah Yun
Item 1
Item 1 Staff Report
Item 1: Staff Report
Pg.
1 Packet Pg. 6 of 368
CITY COUNCIL
DRAFT ACTION MINUTES
Special Meeting
November 27, 2023
The City Council of the City of Palo Alto met on this date in the Council Chambers and by virtual teleconference at 5:30 P.M.
Present In Person: Burt, Kou, Lauing, Lythcott-Haims, Stone, Tanaka, Veenker Present Remotely:
Absent:
Special Orders of the Day
1. Presentation on 2023 Palo Alto Community Health Fair Gratitude & Better Health
2. Proclamation Honoring iSing’s Performance at the 2023 World Choir Games
Closed Session
3. CONFERENCE WITH LABOR NEGOTIATORS Authority: Cal. Gov. Code section 54957.6; Agency representative: Jeremy Dennis, MRG; Unrepresented Employees: City Manager and City Attorney
MOTION: Vice Mayor Stone moved, seconded by Mayor Kou to go into Closed Session.
MOTION PASSED: 7-0
Council went into Closed Session at 5:54 P.M.
Council returned from Closed Session at 7:15 P.M.
Mayor Kou announced no reportable action.
Consent Calendar
Mayor Kou registered a no vote on Agenda Item Number 14.
Item 1
Attachment A -
November 27, 2023 Draft
Action Minutes
Item 1: Staff Report
Pg.
2 Packet Pg. 7 of 368
DRAFT ACTION MINUTES
Sp. City Council Meeting
Draft Action Minutes: 11/27/2023
Council Member Tanaka registered a no vote on Agenda Item Number 7, 8, 9, 13.
Council Member Burt registered a no vote on Agenda Item Number 6.
MOTION: Council Member Lythcott-Haims moved, seconded by Mayor Kou to approve Agenda Item Numbers 4-15.
MOTION SPLIT FOR THE PURPOSE OF VOTING
MOTION PASSED ITEMS 4-5, 10-12, 15: 7-0
MOTION PASSED ITEM 6: 6-1, Burt no
MOTION PASSED ITEMS 7, 8, 9, 13: 6-1, Tanaka no
MOTION PASSED ITEM 14: 6-1, Kou no
4. Approval of Minutes from November 6, 2023 Meeting
5. Approval of Professional Services Contract Number C24185875 With Woodard & Curran in an Amount Not to Exceed $498,866 for the Sewer Master Plan Study Services for a Period of two Years
6. Adoption of a Resolution Approving a Consent and Direct Agreement With HA RNG 1 Lender LLC and Ameresco Half Moon Bay LLC Consenting to Ameresco Half Moon Bay LLC’s Assignment of its Rights in its 2005 Power Purchase Agreement With the City to HA RNG 1 Lender LLC , and Authorizing the City Manager or Designee to Execute any Documents Necessary to Administer Six Renewable En ergy Power Purchase Agreements Approved From 2004-2010 in a Manner Consistent with the City Council‘s Prior Funding Authorization, the Palo Alto Municipal Code and City Council Approved Policies. CEQA Status – Not a Project under Public Resources Code 21065
7. Approval of Budget Amendments in the Residential Housing In-Lieu Fund and the General Fund to Reflect Prior City Council Funding Commitments for the Development of 525 East Charleston Road/Mitchell Park Place and Authorization of 525 East Charleston Road/Mitchell Park Place Loan Preparation and Execution
8. Approval of Amendment No. 5 to Contract No. C12142825 with NV5, Inc. to add $295,083, increasing the not -to-exceed amount to $2,176,406, for Right -of-Way Appraisal and Acquisition Support for the Newell Road/San Francisquito Creek Bridge Replacement Project, Capital Improvement Program Project PE -12011. CEQA: Environmental Impact Report for Newell Road/San Francisquito Creek Bridge (Resolution No.9889).
Item 1
Attachment A -
November 27, 2023 Draft
Action Minutes
Item 1: Staff Report
Pg.
3 Packet Pg. 8 of 368
DRAFT ACTION MINUTES
Sp. City Council Meeting
Draft Action Minutes: 11/27/2023
9. Approval of a License Agreement with E quinix, LLC for a Three -Year Term in an Amount Not-to-Exceed $536,528, and Authorization of a Contingency Amount Not- To-Exceed $106,900 for Related, Additional but Unforeseen Services Which may Develop During the Project; CEQA Status - Not a Project
10. Approval of Amendment Number 2 of Six Development Services On -Call Consulting Contracts to Increase the Not-to-Exceed amount by $3.40 million for a Total Not to Exceed $9.75 Million Through December 2024 to Provide Expertise for Plan Review and Inspection Servic es With all Work Subject to Assigned Task Order and Availability of Funds; Environmental Assessment: Exempt in Accordance with CEQA Guidelines Section 15061(b)(3).
11. Approval of Two Sublease Agreements with Palo Alto Community Child Care and Kids Choice for an Initial 12-Month Term
12. Approval of Purchase Orders with WESCO (Representative of EATON/COOPER) and Anixter (Representative of S&C) to Purchase Dielectric Switches for Electric Grid Modernization in an Annual amount of $2,000,000 for Five Years for a Tota l-Not-to- Exceed Amount of $10,000,000
13. SECOND READING: Adoption of an Ordinance Amending the Stanford University Medical Center (SUMC) Development Agreement Adjusting the Timeline for Achieving the SUMC Alternative Mode Share Targets. Zoning District: HD (H ospital District). Environmental Review: Project is Consistent with the 2011 Certified Environmental Impact Report (EIR) for the SUMC Facilities Renewal and Replacement Project. (FIRST READING: October 23, 2023 PASSED 4-2-1, Lythcott-Haims and Tanaka No, Veenker Recused)
14. SECOND READING: Interim Ordinance Temporarily Continuing Expansion of Outdoor Dining Retail and Other Activities until December 31, 2024 (FIRST READING: November 7, 2023 PASSED 5-2, Kou, Veenker no)
15. SECOND READING: Adoption of an Ordinance Renewing the Police Department's Military Equipment Use Policy Under AB 481 (FIRST READING: November 13, 2023 PASSED 7-0)
Action Items
16. PUBLIC HEARING: Adoption of an Ordinance Amending the Palo Alto Municipal Code to Add Chapter 9.65 and Amend Chapter 9.72 to Establish a Mandatory Registry Program of Residential Rental Units in the City of Palo Alto; Provide Direction to Staff on the Rental Registry Program Implementation. CEQA Status – Exempt under CEQA Guidelines Section 15061(b)(3).
MOTION: Vice Mayor Stone moved, seconded by Council Member Veenker to:
Item 1
Attachment A -
November 27, 2023 Draft
Action Minutes
Item 1: Staff Report
Pg.
4 Packet Pg. 9 of 368
DRAFT ACTION MINUTES
Sp. City Council Meeting
Draft Action Minutes: 11/27/2023
1. Adopt an Ordinance (Attachment A) establishing a mandatory rental registry program that collects rental unit information for multifamily units and single-family rental units, enables cost recovery fees, and allows for enforcement.
2. Direct staff to commence with a phased implementation initially with multifamily housing (3-units and above), and return to Council to evaluate the potential expansion to all rental properties including single family homes at the end of year two.
3. Return to Council with a contract for professional services, authorization for one new full- time position in FY 2024-2025, and resolutions as detailed in the staff report.
4. Direct staff to survey existing enforcement mechanisms and Ghost House (extended vacancy) data collection in other jurisdictions and return to Council by end of calendar year 2024.
5. Amend Attachment A to include an event -based registration on unlawful detainers and rent increases.
MOTION PASSED: 6-1, Tanaka no
17. Policy and Services Committee Recommendations for Changes to the City Council Procedures and Protocols Handbook based on Prior City Council Referrals Agenda Item 17 was deferred to a date to be determined.
Adjournment: The meeting was adjourned at 10:57 P.M.
Item 1
Attachment A -
November 27, 2023 Draft
Action Minutes
Item 1: Staff Report
Pg.
5 Packet Pg. 10 of 368
DRAFT ACTION MINUTES
Sp. City Council Meeting
Draft Action Minutes: 11/27/2023
ATTEST: APPROVED:
____________________ ____________________
City Clerk Mayor NOTE: Action minutes are prepared in accordance with Palo Alto Municipal Code (PAMC)
2.04.160(a) and (b). Summary minutes (sense) are prepared in accordance with PAMC Section
2.04.160(c). Beginning in January 2018, in accordance with Ordinance No. 5423 , the City Council
found action minutes and the video/audio recordings of Council proceedings to be the official records of both Council and committee proceedings. These recordings are available on the City’s website.
Item 1
Attachment A -
November 27, 2023 Draft
Action Minutes
Item 1: Staff Report
Pg.
6 Packet Pg. 11 of 368
City Council
Staff Report
From: City Manager
Report Type: CONSENT CALENDAR
Lead Department: Public Works
Meeting Date: December 11, 2023
Report #:2308-1879
TITLE
Regional Water Quality Control Plant Joint Intercepting Sewer Rehabilitation Project Phase 1:
Approval of Construction Contract, Construction Management Contract Amendment, and Addendum 12 to the Mountain View, Los Altos, and Palo Alto Agreement on Project Funding; CEQA status – Exempt under CEQA Guidelines Section 15301 (Repairs to Existing Facilities)
RECOMMENDATION
Staff recommends that Council:
1) Approve and authorize the City Manager or their designee to execute the contract with SAK Construction, LLC in the amount of $7,347,700 for the Joint Intercepting Sewer Rehabilitation (Phase 1) Project, funded in Wastewater Treatment Enterprise Fund Capital Improvement Program, Project WQ-24000, at the Regional Water Quality Control Plant;
2) Authorize the City Manager or their designee to execute one or more change orders to the contract with SAK Construction, LLC for related, additional but unforeseen work that may develop during the project, the total value of which shall not exceed $734,770 or 10% of the contract amount, for a total not-to-exceed amount of $8,082,470; 3) Approve and authorize the City Manager or their designee to execute Amendment No. 1 to Contract No. C21176592E with Tanner Pacific, Inc. to increase the contract amount by $852,499 to provide construction management and inspection services during construction of the Joint Intercepting Sewer Rehabilitation (Phase 1) Project (CIP WQ- 24000). The revised total contract amount is not to exceed $852,500 including $775,000 for basic services and $77,500 for additional services; and 4) Approve and authorize the City Manager or their designee to execute Addendum No. 12 to the basic agreement between the City of Palo Alto, the City of Mountain View, and the City of Los Altos.
EXECUTIVE SUMMARY
The Joint Intercepting Sewer Rehabilitation (Phase 1) Project will install a structural liner onto the interior surfaces of severely corroded concrete pipe, measuring 2,364 linear feet in length and 72 inches in diameter, near the Regional Water Quality Control Plant. The new liner will extend the life of the sewer pipe and prevent a future collapse of the concrete pipe in the Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
1 Packet Pg. 12 of 368
absence of rehabilitation such as liner installation. Council approval is needed for a construction contract with a specialty contractor, a construction management contract amendment to oversee the contractor’s work, and an Addendum No. 12 to the Basic Agreement with Palo Alto, Mountain View, and Los Altos to repay costs for the construction work in Fiscal Year 2024 and 2025.
BACKGROUND
The Regional Water Quality Control Plant (RWQCP, Plant) owns and maintains a 72-inch diameter trunk sewer known as the Joint Intercepting Sewer, which conveys raw sewage from Mountain View, Los Altos, Los Altos Hills, and a portion of Palo Alto. There are other sewers leading to the RWQCP, but these are maintained by the Utilities Department, Stanford University, and the East Palo Alto Sanitary District.
The Joint Intercepting Sewer was constructed in 1972 and consists of multiple sections of 60- inch and 72-inch diameter reinforced concrete pipes with gasketed bell and spigot joints. The original pipe is unlined with no external coating. The pipes are approximately 9,000 feet long.
The pipeline’s alignment starts at a metering station located at 1151 San Antonio Road on the border of Palo Alto and Mountain View. The alignment runs northwest and below grade through the Baylands Nature Preserve and along the western edge of the City’s closed landfill.
The pipeline ends at an influent junction box inside the RWQCP.
The need for rehabilitation or replacement of the Joint Intercepting Sewer was first identified in the Long Range Facilities Plan (LFRP)1, which was accepted by the Council in July 20122. The need for rehabilitation was confirmed in 2020 via a condition assessment, which included closed circuit television (CCTV) inspection, sonar inspection, and visual inspections of the entire pipe length. Based on the findings, the downstream sections (approximately 2,364 feet) closest to the Plant exhibited the greatest deterioration. The lower section of pipeline has exposed and corroded structural rebar, spalling and cracked concrete, and noticeable offset and separation at some pipe joints and manholes. This Joint Intercepting Sewer Rehabilitation Phase 1 Project will rehabilitate the deteriorated 2,364-feet section of pipeline and manholes. A design contract was awarded to Jacobs Engineering Group, Inc. by Council on May 16, 20223. The design was completed in August 2023.
1 Long Range Facilities Plan for the Regional Water Quality Control Plant, 2012; https://www.cityofpaloalto.org/files/assets/public/public-works/water-quality-control-plant/lrfp-final-report-08- 2012.pdf
2 City Council, July 2, 2012; Consent Item #1; SR #2914, https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes-reports/reports/city-manager-reports- cmrs/year-archive/2012/id-2914.pdf
3 City Council, May 16, 2022; Consent Item #7; SR #14164, https://www.cityofpaloalto.org/files/assets/public/v/1/agendas-minutes-reports/reports/city-manager-reports- cmrs/year-archive/2021/2022/id.-14164.pdf
Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
2 Packet Pg. 13 of 368
Based on the 2020 sewer inspection, the upstream sections (approximately 6,600 feet to the metering station) show less severe deterioration and will be reassessed in the next five to ten years to establish the timing and need for the Phase 2 rehabilitation work. Attachment A is a figure showing the project phases.
The Joint Intercepting Sewer’s maximum allocated flow capacity and cost sharing allocation for each partner agency is shown in Table 1 below. Maximum flow capacity is reached during high flow events during wet weather.
Table 1: Maximum Flow Capacity Allocation and Fixed Cost Share Item Mountain View Palo Alto Los Altos Los Altos Hills Total Maximum Allocated Flow
Capacity
(million gallons per day)
50.00 14.59 12.00 3.41 80.0
Allocated Share (percent) 62.50% 18.24% 15.00% 4.26% 100%
ANALYSIS
This Project will rehabilitate approximately 2,364 feet of the 9,000 feet of the Joint Intercepting Sewer from Manhole No. 4 to the Plant’s influent junction box (a.k.a., JB-0). This section of the pipe is shown in Attachment A as the Phase 1 project. Rehabilitation includes repair and recoating the interior of existing manholes and the influent junction box. An above grade temporary bypass pumping system consisting of pumps and piping will be installed in the vicinity of the existing sewer pipeline to allow the contractor to access, clean, inspect, and rehabilitate the interior of the sewer line and manholes. Pipe rehabilitation will use the cured- in-place pipe (CIPP) method, in which a resin-impregnated liner is inserted, expanded, cured, and adhered onto the existing pipe’s interior surfaces. The cured liner will become a new pipe inside the existing host pipe, providing structural strengthening as well as smoother and corrosion resistant surfaces that will not reduce the trunk sewer’s service capacity. Its service life is expected to be extended by 25 to 50 years. This method will result in minimal site disturbance and require the least amount of construction staging area compared to other repair methods such as open trench pipe replacement. The Utilities Department has utilized CIPP lining on City sewers, having rehabilitated approximately 23,025 feet (4.36 miles) of the City’s pipes ranging from 6 inches to 42 inches in diameter.
Construction activities are expected to take place inside the RWQCP (30 percent of the work) and outside the RWQCP (70 percent of the work) along the alignment of the sewer interceptor on small undeveloped areas outside the plant’s fence line and gravel access road west of Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
3 Packet Pg. 14 of 368
Byxbee Park. Temporary fencing will be set up along the boundary of the project site.
Construction fences will have six to eight inches of openings at the bottom to allow wildlife to pass through the area. Screening will be attached to project fencing to reduce noise and light outside the construction area. An informational site map showing the URL to the project’s website and detour signs will be set up on trails at appropriate locations. Construction activities lasting up to five months will occur during daytime only and traffic will be limited to material and fuel deliveries. When construction vehicles travel outside of fenced work area, traffic control flaggers will walk ahead and behind each truck to ensure public safety. The contractor’s personnel will be onsite 24/7 to monitor the temporary bypass pumping system, which is expected to last two to four months. The temporary bypass pumps will be enclosed to comply with noise ordinances while pumps and piping will be sealed to contain odors. Illumination, as needed to meet OSHA safety requirements at the bypass pumps, will be soft lights with directional shields and with on/off switches. City staff will coordinate with other projects in the Baylands (e.g., the Horizontal Levee Project) to minimize schedule and parking impacts.
A biological survey was conducted by two qualified biologists from the project’s design consultant, Jacobs Engineering Group, Inc., on March 1, 2023 at the proposed project site and throughout a 250-feet buffer zone beyond the perimeter of the project site. The field survey showed no sensitive habitat within the project site and found that construction activities are not anticipated to directly or indirectly impact adjacent aquatic resources or special-status plants and animals, which were determined to be absent or unlikely to occur within the project footprint. Special-status birds, including salt marsh common yellowthroat, Alameda song sparrow, and burrowing owl, could nest outside and near the project footprint. Preconstruction surveys for nesting birds and burrowing owls will be conducted at 24 days and at 24 hours prior to the start of field construction activities. If active nests are detected, buffers around nests will be established to ensure breeding is not disrupted or adversely impacted by construction. With these measures in place, potential adverse impacts to special status animals will be avoided or minimized.
Bid Process
On August 29, 2023, the City solicited formal bids from qualified contractors for this Project.
The bidding period was 49 calendar days. Three bids were received on October 16, 2023, with bid prices ranging from $7,347,700 to $11,051,740 as listed in the attached Bid Summary (Attachment B).
Table 2: Summary of Invitation for Bids
Project Bid Name/Number Joint Intercepting Sewer Rehabilitation (Phase 1) Project, IFB #189237
Proposed Length of Project 9 months after Notice to Proceed Total Days to Respond to Bid 49
Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
4 Packet Pg. 15 of 368
Table 2: Summary of Invitation for Bids
Mandatory Pre-Bid Meeting Yes
Number of Company Attended Pre-Bid Meeting 9
Number of Bids Received: 3
Base Bid and Additive Alternate Price Range $7,347,700 to $11,051,740 Public Link to Solicitation https://procurement.opengov.com/portal/palo-alto- ca/projects/58535/document
Staff has reviewed all bids submitted and recommends the bid of $7,347,700 submitted by SAK Construction, LLC be accepted and SAK Construction, LLC be declared the lowest responsible bidder. The base bid is 7.3% above the engineer's estimate of $6,850,287 and is within the expected level of estimating accuracy. A contingency amount of $734,770 (10% of the bid price) is requested for related, additional but unforeseen work that may develop during the project.
Staff confirmed with the Contractor's State License Board that the contractor has an active license on file. It is recommended that Council approve and authorize the City Manager or their designee to execute the contract with SAK Construction, LLC4.
Construction Management Contract Amendment
The RWQCP capital program requires specialized consultant services to manage the construction and inspection of construction contract work. These services are an extension of staff and essential for providing quality assurance to ensure that: 1) the construction contractor is adhering to the project-specific specifications and contract requirements; and 2) the City is receiving the as-designed infrastructure in an efficient, timely, and coordinated manner.
On June 21, 2021, Council approved five separate five-and-a-half-year contracts (Contract Nos.
C21179265A through C21179265A E) with MNS Engineers, Inc.; CDM Smith; Carollo Engineers, Inc.; MCK Americas, Inc. and Tanner Pacific, Inc. for RWQCP On-Call Construction Management and Inspection Services with a total not-to-exceed amount of $1 for each contract5.
On September 8, 2023, staff requested proposals from all five construction management consultants for Task 4 Services for the Joint Intercepting Sewer Rehabilitation (Phase 1) Project.
No proposals were received initially on October 6, 2023. To ensure timely construction completion, staff reached out to all five consultants to request a proposal by November 7, 2023. The five consultants are experiencing resource constraints due to multiple, ongoing, Bay 4 SAK Construction, LLC., Construction Contract for the Joint Intercepting Sewer Rehabilitation (Phase 1) Project, C24189237; https://www.cityofpaloalto.org/files/assets/public/v/1/public-works/water-quality-control-plant/files- for-staff-reports/joint-intercepting-sewer/c24189237_sak-construction-contract-for-sr1879.pdf 5 City Council, June 21, 2021; Agenda Item #21; SR #12324, https://www.cityofpaloalto.org/files/assets/public/v/2/agendas-minutes-reports/reports/city-manager-reports- cmrs/year-archive/2021/id-12324.pdf
Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
5 Packet Pg. 16 of 368
Area construction projects. Furthermore, specialty inspectors are limited for the key tasks of CIPP lining and fusion of high density polyethylene bypass piping. On November 7, 2023, staff received a proposal from Tanner Pacific, Inc. who previously provided construction management and inspection services to the City of Mountain View for their large diameter sewer pipe rehabilitation project, which utilized CIPP technology similar to this project.
Mountain View staff provided positive feedback regarding Tanner Pacific’s construction management services in Mountain View.
Staff recommends that Council approve and authorize the City Manager or their designee to execute Amendment No. 1 to Contract No. C21179265E (Attachment C) with Tanner Pacific, Inc. to: 1) add Task 4 Services to provide construction management and inspectional services during the construction of the Joint Intercepting Sewer Rehabilitation (Phase 1) Project; and 2) increase compensation by $852,499, from $1 to $852,500. A 10% contingency has been included with the requested amount.
Partner Agencies Agreements
The Joint Intercepting Sewer receives flows from Mountain View, Los Altos, Los Altos Hills, and a portion of Palo Alto. Addendum No. 12 (Attachment D) is added to the Basic Agreement between Palo Alto, Mountain View, and Los Altos. Addendum No. 12 was approved by the Cities of Mountain View and Los Altos on December 5, 2023 and November 28, 2023, respectively. The City’s agreement with Los Altos Hills does not require approval for capital improvement projects. Addendum No. 12 covers:
•agreement by all partners to construct the Phase 1 Project by rehabilitating the 72-inch- diameter Joint Intercepting Sewer from Manhole No. 4 to the Influent Junction Box JB-0; •the maximum amount of funding authorized by all partners for the construction of the Joint Intercepting Sewer Rehabilitation Phase 1 Project, including design engineering, construction management, program management, and construction costs; and •agreement by all partners to provide for the sharing of costs associated with this project.
Staff recommends that Council approve Addendum No. 12 (Attachment D) to the basic agreement between the City of Palo Alto, the City of Mountain View, and the City of Los Altos.
After construction commencement, the submittal review process will take three to four months. Construction field activities will be performed during the dry season in 2024 (around mid-April to End of September). Field activities, including mobilization and demobilization, materials procurement, equipment set up and construction work are anticipated to take approximately five months to complete. The Project is expected to achieve substantial completion by September 16, 2024, with final completion by September 30, 2024.
Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
6 Packet Pg. 17 of 368
FISCAL/RESOURCE IMPACT
Funding for project construction is available in the FY 2024 Capital Budget (WQ-24000).
Mountain View, Palo Alto, Los Altos, and Los Altos Hills will fund the project in accordance with the percentages shown in Table 3 below.
Table 3: Cost Share
Item Unit Mountain View Palo Alto Los Altos Los Altos Hills Total Trunk Line Cost
Share % 62.50% 18.24% 15.00% 4.26% 100%
Some of the project expense included in the total project cost of $8.9 million is for the work on the RWQCP site described in Bid Item 6 (approximately $1,896,995), and is the responsibility of all six partner agencies, because the RWQCP continues to use the 72-inch Joint Intercepting Sewer to receive and convey the RWQCP plant-wide return flows to the headworks (e.g., from building sewers, clarifier scum overflow, grit washing process drain, etc.). Each partner is contributing to the return flows. As such, the East Palo Alto Sanitary District and Stanford University will also share in project expenses for the in-plant bypass pumping systems, along with Mountain View, Palo Alto, Los Altos, and Los Altos Hills. The specific bid item for in plant sewer bypassing will be split between all partners based on their share of the ongoing pay-as- you-go capital budget. Palo Alto’s share of the onsite bypassing work cost to be shared by all partners is estimated to be about 35% (i.e., about $663,379 of the estimated $1,896,995 expense).
Actual cost share will be calculated after project completion based on wastewater flows and strength contributed by each partner for 2024.
Table 4 shows the estimated total project construction expenses. See Attachment E for a detailed cost breakdown.
Table 4: Not-to-Exceed Construction Expense by Partner Agencies Partner Agency Cost Sharing
Mountain View $5,159,619
Palo Alto $1,947,106
Los Altos $1,262,089
Los Altos Hills $338,516
East Palo Alto Sanitary District $104,904
Stanford University $122,736
Total Not-to-Exceed Construction Expense including 10%
contingency $8,934,970
Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
7 Packet Pg. 18 of 368
STAKEHOLDER ENGAGEMENT
This project is part of the RWQCP’s major capital improvement program funded by the City of Palo Alto and its five partner agencies who use the RWQCP for wastewater treatment. The five partner agencies are regularly updated on both the need for and the progress of wastewater treatment capital work. Updates are provided each year at an annual meeting and at other periodic meetings established to inform partner agency staff about the major capital improvement program. With respect to Palo Alto itself, the open meetings on the budget process serve as the main vehicle for engaging the community on both new projects such as this and associated rate impacts.
Staff reached out to Mountain View, Los Altos, and Los Altos Hills staff to explain the project and cost allocation. Mountain View completed CIPP relining work on a 42-inch diameter sanitary sewer near Shoreline Park in March 2022. Given Mountain View’s experience, staff conducted outreach with Mountain View’s engineering and operational staff to understand key issues associated with CIPP installation in a public park.
In addition, staff has coordinated with the Community Services Department and other Public Works Department staff to coordinate construction activities, bypass pumping, access, and trail detours in parkland and at the closed landfill. On February 28, 2023, staff presented the project to the City’s Parks and Recreation Commission6. Recommendations received from the commissioners were incorporated into the project’s contract documents.
ENVIRONMENTAL REVIEW
The construction of this project has been determined to be exempt from CEQA under CEQA Guidelines Section 15301, subsection (b) as it involves the repair and maintenance of an existing publicly-owned utility used to provide sewerage treatment services with no expansion on the existing facility. A Notice of Exemption was submitted to and recorded by the State Clearing House and Santa Clara County Clerk-Recorder’s Office on August 7, 2023 (File No.
ENV24700).
6 Parks and Recreation Commission, February 28, 2023; Agenda Item #4; https://www.cityofpaloalto.org/Departments/Community-Services/Other-Services/Commissions/Parks-and- Recreation-Commission/PRC-Current-Year-Agendas-and-Minutes Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
8 Packet Pg. 19 of 368
ATTACHMENTS
Attachment A: Site Map Showing the Project Phases
Attachment B: Bid Summary
Attachment C: Amendment No. 1 to Contract C21179265E with Tanner Pacific, Inc. for Construction Management and Inspection Services
Attachment D: Addendum No.12 to the Basic Agreement between the City of Palo Alto, the City of Mountain View, and the City of Los Altos
Attachment E: Partner Agencies Cost Share Summary
APPROVED BY:
Brad Eggleston, Director Public Works/City Engineer
Item 2
Item 2 Staff Report
Item 2: Staff Report
Pg.
9 Packet Pg. 20 of 368
Legend ±Condition Assessment