The City of Palo Alto’s 20245 Federal and State Legislative Guidelines Adopted January 22, 2024
These Guidelines reflect and activate the City Council’s priorities; they do not supplant  them.

They work to guide staff and the City’s legislative advocates on issues that are important to the City Council, and likely to become a legislative issue. These Guidelines are not rank‐ordered and are meant to allow for a flexible and quick response by staff and advocates, without the need to return to the City Council to seek guidance. The Guidelines work in conjunction with the City Council‐approved  Advocacy  Process  Manual  and  the  City  Council  action  to  do  “Strategic Weighing  in  on  Issues  of  Interest”1  (June  22,  2021  CMR  12344;  Minutes).  The  City  Council’s annual priorities are also guidance for the City’s legislative platform.

The below Foundational Principles represent the ideals that form the core of the City’s policy agenda. The Legislative Guidelines all rise from and strengthen four foundational principles:

1. Promote Local Fiscal Sustainability:

Support measures that promote fiscal stability, predictability, financial independence, and preserve the City’s revenue base and maximum control over local government budgeting.

Also protect local revenue sources and prevent unfunded mandates.

2. Support Funding Opportunities:

Protect, seek, and increase funding for programs, projects, and services. Seek opportunities that allow the City to compete for regional, state and federal funding. Support funding for programs including, but not limited to, economic development, infrastructure investment, housing,  transportation  projects  (such  as  road  improvements,  rail  grade  separations, bicycle  and  pedestrian  safety,  multi‐modal  transportation  systems  and  transit‐oriented development),  air  quality,  water  quality  and  local  water  reliability,  parks  and  recreation, historic preservation, natural resources, hazard mitigation, public safety and public health.

3. Preserve Local Control:

Preserve and protect the City’s powers, duties, and discretion to enact and engage in local processes  and  policy  making  concerning  local  affairs  and  oppose  efforts  and  legislation from  state  and  regional  bodies  that  preempt  local  authority  and  do  not  align  with  City priorities.  Advocate  for  longer  lead  times  for  implementation  of  new  legislation  that adversely impacts Palo Alto. Oppose items that preempt or reduce the authority or ability of  local  government  to  determine  how  to  effectively  operate  local  programs,  services, activities, and  governance.

4. Protect the health and safety of the community:

Support policies and funding that enrich the quality of life for the Palo Alto community with services  that  provide  for  a  safe,  fulfilling,  and  vibrant  life.  Support  policies  that  promote equity.

1 City Council, June 22, 2021; Agenda Item # 7; Staff Report # 12344 https://portal.laserfiche.com/Portal/DocView.aspx?id=99035&repo=r‐704298fc& Item 11
Attachment A - Draft
2025 State and Federal
Legislative Guidelines

Item 11: Staff Report
Pg.
3 Packet Pg. 118 of 227

Page 2 of 4 ends

The City of Palo Alto’s 20245 Federal and State Legislative Guidelines Adopted January 22, 2024
The Legislative Guidelines create the framework for organizing the City’s policy interests, while guiding staff and contracted legislative advocateslobbyists in their advocacy efforts on behalf of the City. The items below provide direction for the City’s efforts when addressing reasonable government actions.

Transportation

The City supports government action that:
• Deters single occupancy drivers and alleviates local traffic congestion • Supports local and regional public transportation
• Regulates technology that diverts traffic into residential neighborhoods • Provides funding for rail grade separations, rail efficiency improvements, and other means of reducing the local impacts of regional transportation systems • Streamlines funding between the state, federal, and local governments that help reduce the amount of time and resources it takes to fund and complete transportation projects. • Sustains local, regional, and state funding sources for the development and maintenance of transportation and does not condition receipt of funds  on non‐transportation related factors
• Supports expansion and/or maintaining and operations of public transit options throughout Palo Alto, especially funding for transit
• Supports  state  legislation  that  maximizes  local  control  related  to  land  use  requirements near  transit  (especially  if  it  impacts  the  City’s  approach  to  planning  for  complete communities)

Climate and Environment

The City supports government action that:

• Reduces GHG emissions and supports just, equitable, and cost‐effective progress toward GHG reduction, and carbon neutrality goals, and electrification • Maintains or expands funding resources for local governments to reduce GHG emissions • Reduces airplane noise, health impacts, and/or airplane emissions • Promotes residential, commercial, and vehicle electrification programs • Promotes  workforce  development  to  provide  increased  workforce  needed  for electrification and grid modernization
• Promotes the  use  of  renewable  resources, water conservation,  and  the  flexible  use  of existing resources
• Continues  support  for  a  statewide  ban  on  polystyrene  containers  and  packaging materials
• Provides  opportunities  for  staff,  in  partnership  with  the  San  Francisquito  Creek  Joint Powers  Authority  and  other  regional  stakeholders,  to  advance  efforts  to  improve  the creek’s watershed and floodplain (especially related to local bridges) • Supports efforts to protect local communities from sea level rise and other impacts of climate change
Item 11
Attachment A - Draft
2025 State and Federal
Legislative Guidelines

Item 11: Staff Report
Pg.
4 Packet Pg. 119 of 227

Page 3 of 4 ends

The City of Palo Alto’s 20245 Federal and State Legislative Guidelines Adopted January 22, 2024
• Supports responsible processing of recyclables once removed from Palo Alto and other communities,  including  promoting  processing  facilities  and  recyclables  markets  within the United States
• Strengthens and modernizes the State and Local electric grids and grid capacity • Supports  the  protection  of  our  natural  environment,  including  open  space,  trees/tree canopy, and biodiversity

Financial

The City supports government action that:

• Supports the long‐term stability of CalPERS and the ability of local governments to mitigate and manage with flexibility its pension obligations
• Protects the funding sources for the sustainable delivery of City services • Supports the continued deductibility of tax‐exempt municipal bonds and the restoration of Advance Refunding of Tax‐Exempt Municipal Bonds
• Supports  the  continuance  of  tax  credits  available  at  the  federal  level  to  support  low‐ income individuals in achieving housing affordability and financial stability • Supports the  lowering  or maintaining  maintenance  of  voter thresholds for  local revenue measures
• Supports  maximum  flexibility  for  local  government  in  contracting  and  contract negotiations
• Supports  reforms  to  local  revenue  financing  tools  for  the  purpose  of  supporting  the development of affordable housing and public infrastructure • Supports efforts to attract and retain resources for current and future smaller businesses in Palo Alto
• Preserves local discretion in the assessment, collection, and usage of development fees

Governance, Transparency, and Human Resources

The City supports government action that:

• Preserves local government’s ability to manage its own employment issues, including, but not limited to hiring, evaluating, disciplining, and/or terminating and negotiating collective bargaining agreements with employees’ representatives
• Supports  reasonable  regulatory  efforts  surrounding  policies  regarding  cybersecurity, drones, shared mobility services, returning to Obama‐era net neutrality regulations, and smart city initiatives
• Provides  for  the  incremental  and  thoughtful  integration  of  artificial  intelligence technologies
• Protects individual privacy and allows the City to safeguard customer information • Maintain existing records collection and retention requirements • Promote teleconferencing flexibilities under the Ralph M. Brown Act • Allows the City to support the collaborative work of regional partners, trade associations, Item 11
Attachment A - Draft
2025 State and Federal
Legislative Guidelines

Item 11: Staff Report
Pg.
5 Packet Pg. 120 of 227

Page 4 of 4 ends

The City of Palo Alto’s 20245 Federal and State Legislative Guidelines Adopted January 22, 2024
other local governments and organizations, and Joint Powers Authorities • Provides for the equal treatment of all individuals

Housing

The City supports government action that:
• Supports reasonable housing policies that recognize local autonomy to maintain the local public process and preserve local government’s ability to determine land use policies and development standards
• Provides  flexible,  ongoing  funding  for  (a)  affordable  housing,  (b)  homelessness,  and  (c) infrastructure (such as parks, utilities, roads, and transit) required to support the increased housing production and keep pace with local development goals • Promotes  the  development  and  enhancement  of  safe  and  affordable  housing  and accessible housing within the City for all economic segments of the population • Promotes  funding  and  tax  incentives  for  the  identification,  acquisition,  maintenance, adaptive reuse, and restoration of historic sites and vacant structures • Fosters reasonable ratios between jobs and housing
• Supports  the  development  and  implementation  of  efficient  and  environmentally sustainable land use and building practices
• Supports the provision of greater lead times for Palo Alto to implement state legislation when necessary to comply with new land use and housing requirements within the local context

Public Safety

The City supports government action that:

• Supports  efforts  which  seek  to  modify  policing  services,  including  but  not  limited  to alternative  public  safety  models  and  funding  to  address  community  mental  health issues,  expansion  of  requirements  regarding  police  data  and  rules  regarding  prior employment  information  transparency,  and  expansion  of  data  and  communications including radio encryption
• Provides for greater public safety support resources especially related to organized retail theft operations
• Reduces weapons‐related violence via the enactment of common‐sense firearm reforms • Enhances  fire  and  emergency  training  and  response  capabilities.  Mitigate  fire  safety risks.  Advocate  for  funding  and  policy  to  mitigate  wildfire  risks  and  funding  for  fire services in general as well as funding for emergency services. • Updates, implements, and refines processes, services, and programs affecting the City.

This  includes,  but  is  not  limited  to,  public  safety  reform  efforts  and  streamlining reporting mandates
• Support legislation that would address ongoing safety concerns and help prevent acts of violence motivated by hate, including improving data collection and reporting Item 11
Attachment A - Draft
2025 State and Federal
Legislative Guidelines

Item 11: Staff Report
Pg.
6 Packet Pg. 121 of 227

1 6
4 8
1 M E M O R A N D U M
To: The Honorable Greer Stone and Members of the Palo Alto City Council CC:Ed Shikada, City Manager
Chantal Cotton Gaines, Deputy City Manager
Christine Prior, Deputy City Clerk
From: Townsend Public Affairs
Christopher Townsend, President
Niccolo De Luca, Vice President
Alex Gibbs, Grants Director
Carlin Shelby, Senior Associate
Joseph Melo, Senior Federal Associate
Date: December 30, 2024
Subject: State and Federal Legislative Updates
Townsend Public Affairs, Inc. (TPA) has prepared this report for the City of Palo Alto to provide a summary of State, Federal, and funding efforts and highlight the current status of the legislative process.

STATE LEGISLATIVE UPDATES
Legislature Commences 2025-26 Session
On December 3, the California State Assembly and Senate reconvened for an Organizational Session to welcome new legislators, adopt house rules, and elect their respective leadership teams. Overall, 29 newly elected Senators and Assembly Members were sworn in during the convening of the 2025-26 Legislative Session. This number is slightly less than the 37 new lawmakers that were sworn in at the beginning of the 2023-24 Session. This means that over half of the state’s 120 legislators began their tenures on or after 2023.

One notable change to the Standing Rules in each house is a reduction in how many bills legislators may introduce during a two-year Session. Assemblymembers and Senators are now only permitted to introduce 35 bills, a change from 50 in the Assembly and 40 in the Senate, in order to allow more time for consideration of measures and improve the deliberative process. So far, approximately 140 bills, resolutions, and constitutional amendments have been introduced since December 2nd.

Assemblymember Robert Rivas and Senator Mike McGuire were re-elected as Assembly Speaker and Senate pro Tempore, respectively, and both addressed their chambers kicking off their Regular and Special Sessions. Members from both houses introduced bills in the Special Session related to shoring up resources for the Department of Justice (DOJ) to pay for federal litigation expenses, one of which appropriates $500,000 to the Department. More details on the Special Session and funding to DOJ are anticipated to coincide with the Governor’s January Item 11
Attachment B - Townsend
Public Affairs Update
Memo

Item 11: Staff Report
Pg.
7 Packet Pg. 122 of 227

2 6
4 8
1 Budget. Next, we can expect changes to committee chairs and membership as members and staff get settled in.

Key issues TPA looks forward to advocating on behalf of the City during the 2025 Legislative Session include:
•Ensuring grade separation funding rescinded in last year’s budget is reinstated and the City’s projects can move forward: In 2022, the Budget Act allocated $113,790,000 from the Transit and Intercity Rail Capital Program (TIRCP) for critical grade separation initiatives in Burlingame, Mountain View, and Palo Alto. The City of Palo Alto was specifically awarded $23.79 million for the Connecting Palo Alto project, which focuses on grade separation at Churchill Avenue, Meadow Drive, and Charleston Road.

In response to the proposed funding cuts, the City, TPA, and other stakeholders worked to craft budget trailer bill language (contained within AB/SB 173) that requires transportation funding agencies to coordinate and identify available funding in state transportation programs to supplement the funds eliminated under the TIRCP and other grade separation programs. The funding plan is required to be finalized by April 30, 2025 and will prioritize and directly allocate funding to projects that are at risk of losing or failing to secure federal and local funding commitments, or that are at risk of approved project delays. According to CalSTA program administrators, this funding strategy has already been finalized and will be included as part of the January budget proposal. •Protecting Locally Contracted Artists from Litigation: Local agencies, including the City of Palo Alto, have encountered difficulties in contracting with local artists using local funds due to different interpretations of state contracting law and the standards governing who is and is not a licensed artist. TPA will be working with the legislature and other local agencies to create clarity and allow the City to move forward with its robust local art program without the threat of costly litigation.
•Brown Act Flexibility extension: Several statutes associated with remote meeting flexibilities for elected officials during times of emergency or other extenuating circumstances are set to expire during the 2025-26 legislative session. TPA will be working with the legislature and other local stakeholders to extend and/or expand these flexibilities to accommodate the needs of elected officials, public transparency, and even the cities non decision making bodies, such as subcommittees.
•Proposition 36 Implementation: In the November 2024 election, voters overwhelmingly passed Proposition 36, which overturned certain provisions associated with penalizing serial theft offenses within Proposition 47 (2014). TPA will work with the legislature and local stakeholders on legislation aimed at the seamless implementation of some of the provisions contained within Proposition 36, including diversion programs and resources for repeat offenders with behavioral health or substance use disorders.

State Budget Update: November Income Tax Withholdings Below Projections; 2025-26 Fiscal Outlook Highlights Budget Challenges
November Personal Income Tax (PIT) withholdings came in $806 million, or about 10%, below projections, though year-to-date PIT withholdings for fiscal year 2024-25 remain roughly aligned with expectations. The shortfall largely reflects a shift in bonus and stock option remittances, Item 11
Attachment B - Townsend
Public Affairs Update
Memo

Item 11: Staff Report
Pg.
8 Packet Pg. 123 of 227

3 6
4 8
1 delayed from November to December due to the later Thanksgiving holiday. Encouragingly, the week following Thanksgiving saw collections rise approximately 20% over the same period last year, with this uptick likely bolstering December's totals.

Despite the immediate revenue dip, the state’s broader fiscal condition remains under evaluation.

In late November, the Legislative Analyst’s Office (LAO) released its Fiscal Outlook Report for the 2025-26 budget cycle, forecasting a small deficit of $2 billion. The report attributes this near-term stability to increased state revenues, particularly from high-income earners and stock market performance. However, significant challenges loom, with spending growth in health and human services programs driving projected deficits in subsequent years.

The LAO highlights a concerning trend: revenue growth over the forecast window (2025-26 to 2028-29) is estimated at just over 4%, below its historical average, while spending growth is projected at 5.8%. Much of this imbalance stems from rising obligations, particularly in education, outpacing revenue improvements. Without policy changes, the state faces the risk of growing structural deficits.

Legislative leaders are urging caution in the upcoming budget process. Assembly Speaker Rivas emphasized the importance of maintaining essential services while avoiding program expansions, stating, “It’s not a moment for expanding programs, but for protecting and preserving services that truly benefit all Californians.”
Looking ahead, the Governor and Department of Finance will incorporate these findings into the January Budget Proposal, set to be released by January 10, 2025. As always, the state’s fiscal outlook remains subject to adjustments, particularly as additional tax return filings are collected throughout the year.

FEDERAL UPDATES
Congressionally Directed Spending Submittal
For the FY 2024 Federal Appropriations Process, The City/TPA team worked in partnership to draft, fine-tune, and submit congressionally directed spending requests for funding to complete the Fire Station No. 4 Project and the Palo Alto Intermodal Station Project.

Both projects were determined to meet the required criteria to be eligible for federal community project request funding, including that they were shovel-ready and near completion, and had previous state and local community support.

Congresswoman Eshoo put forward the Fire Station No. 4 project funding in the amount of $3,000,000. Her office did not choose the Palo Alto Intermodal Station as a priority project.

Following her selection of the project and advocacy with federal appropriators, the House Transportation Housing and Urban Development (THUD) Committee included the request in its markup of the appropriations package for $1,250,000. This funding amount is reflective of bipartisan negotiations, budget topline numbers, and requests among all 50 states. It is anticipated that this funding will remain stabilized as the FY 25 Federal Appropriations process continues. TPA advocates will continue to advocate for its inclusion in subsequent appropriations process actions and will monitor the progress of the Senate.

Item 11
Attachment B - Townsend
Public Affairs Update
Memo

Item 11: Staff Report
Pg.
9 Packet Pg. 124 of 227

4 6
4 8
1 Federal Appropriations Update
After a week of rollercoaster negotiations, Congress has approved a legislative package to avert a government shutdown and extend current government funding levels until March 14, 2025. The bill, H.R.10545 also includes provisions providing more than $100 billion in disaster relief and several extensions of health care and agriculture programs.

This final package comes after two previous attempts failed earlier in the week. The first proposal, which Republicans negotiated with Democrats, included measures to regulate pharmacy benefit managers, limit trade with China, and allow year-round sales of certain ethanol-blended fuels.

However, this proposal was withdrawn after President-elect Donald Trump opposed it, urging Republican leaders to address the debt limit first.

A second plan, which removed most of the provisions from the first, aimed to suspend the debt limit until January 2027. This plan was rejected on December 19, with a vote of 174-235, as 38 Republicans opposed it and only two Democrats supported it.

The latest plan resembled the second but excluded the debt limit suspension and extensions for the Stephanie Tubbs Jones Child Welfare Services Program and the MaryLee Allen Promoting Safe and Stable Families Program. The House approved this plan by a vote of 366-34 with one member voting present.

Relevance to Palo Alto:

As a result of negotiations, the package was narrowly focused on four main provisions:

1. Extending current government funding until March 14, 2025.

2. Enacting supplemental appropriations for disaster relief efforts.

3. Extending certain expiring health care programs.

As a result, impacts on the City are limited to avoiding the impacts of expiring programs and a lapse in funding.

Summary of H.R. 10545, the American Relief Act, 2025
Spending Provisions
•The legislative package included a continuing resolution (CR) extending current funding from Fiscal Year 2024 appropriations through March 14, 2025. •Anomalies (adjustments to funding that differ from FY24 appropriations) include:
oAllocate an annualized $625 million to the National Oceanic and Atmospheric Administration to maintain the acquisition schedule for the Geostationary Earth Orbit weather satellite program.
oPermit the Federal Aviation Administration to use funds necessary for air traffic operations, aviation safety oversight, and the hiring and training of air traffic controllers. oAuthorize the Energy Department to utilize funds required for specialized security activities.
oGrant the Education Department the flexibility to allocate funds needed to administer federal student loan and aid programs.
•The bill blocks an automatic cost of living pay increase for Members of Congress, the Vice President, and other executive and senior-level government officials.

Item 11
Attachment B - Townsend
Public Affairs Update
Memo

Item 11: Staff Report
Pg.
10 Packet Pg. 125 of 227

5 6
4 8
1 Extensions
•Several programs that were set to expire are extended through March 14, 2025, these include:
oThe CFTC Whistleblower Program
oThe Domestic Trafficking Victims Fund
oTemporary Assistance for Needy Families program.
oFederal Emergency Management Agency’s National Flood Insurance Program. oDHS’ and the Justice Department’s authority to counter uncrewed aircraft systems that pose a credible threat.
oThe Homeland Security Department’s National Cybersecurity Protection System. oUS Agency for International Development’s Food for Peace program.

Disaster Aid
The measure provides $100.4 billion in supplemental emergency assistance for federal disaster relief programs to address recent natural disasters, plus an additional $10 billion for economic aid to farmers.

The total includes $29 billion to replenish the Federal Emergency Management Agency’s Disaster Relief Fund. The measure appropriates an additional $2.2 billion for the Small Business Administration’s Disaster Loan Program.

In summary:
•The measure provides $12 billion for the Housing and Urban Development Department’s Community Development Block Grant-Disaster Recovery program to support long-term recovery efforts in communities affected by major disasters in 2023 and 2024. •It provides $8.1 billion for the Federal Highway Administration’s Emergency Relief Program.
•It authorizes the use of funds to cover 100% of the costs associated with rebuilding the Francis Scott Key Bridge in Baltimore, which collapsed after being hit by a cargo ship in March. Any funds obtained by state and local authorities in Maryland from insurance or lawsuits related to the Key Bridge are used to reduce the federal government’s liability for the cost of reconstruction.
•The measure provides $1.5 billion for the Army Corps of Engineers to address emergency situations and repair damage to Corps flood control projects, including $745 million to prepare for floods and hurricanes.
•It allocates $3.3 billion for Environmental Protection Agency state and tribal assistance grants, including $3 billion for capitalization grants to help repair wastewater and drinking water infrastructure damaged by hurricanes or wildfires. •It provides $3.1 billion to the Interior Department for expenses related to natural disasters in 2024 and previous years, including $2.3 billion for the National Park Service. •The measure allocates $1 billion for the National Oceanic and Atmospheric Administration, including $399 million to acquire hurricane hunter aircraft, $344 million to replace or repair damaged property and equipment, and $300 million for fisheries disaster relief.

Item 11
Attachment B - Townsend
Public Affairs Update
Memo

Item 11: Staff Report
Pg.
11 Packet Pg. 126 of 227

6 6
4 8
1 •It provides $1.5 billion for the Commerce Department’s Economic Development Administration to aid areas that received a major disaster designation in 2023 and 2024. •The bill allows recipients of FEMA disaster relief and preparedness grants to retain unspent administrative funds for up to five years. It also permits them to repurpose these funds to assist with other declared disasters or to enhance their capacity to respond to future emergencies.

Health Programs
The funding package includes several extensions and flexibilities for health programs, including:
•An extension of flexibilities allowing for greater Medicare coverage of virtual telehealth services until March 31, 2025. These were set to expire at the end of 2024. •$1.1 billion from January 1 to March 31, 2025 for the Community Health Center Fund which provides federal funding for community health centers. Funding was set to expire on December 31, 2024.
•The measure extends several expiring provisions through March 31, 2025 including:
oIncreased Medicare payments to low-volume hospitals.
oAdd-on payments for ground ambulances.
oA floor on the geographic index used to calculate provider payment rates under Medicare.
oThe Medicare-dependent hospital program.
•Other health programs extended through March 31, 2025 include:
oThe National Health Service Corps, which provides scholarships and loans to medical students.
oThe Teaching Health Center Graduate Medical Education Program. oThe Special Diabetes Program and Special Diabetes Program for Indians. oThe Personal Responsibility Education Program and Sexual Risk Avoidance Education Program.

GRANT FUNDING UPDATES
The TPA team works directly with City staff and department heads to discuss funding needs and match them with available priorities. Each month, TPA provides the City with a grant opportunities memo, which details upcoming funding opportunities with a focus on transportation and infrastructure, environmental sustainability, public safety, community services, and clean energy needs. Further, the TPA team regularly meets with City staff to discuss these opportunities in greater detail, along with other local/regional programs.

TPA’s efforts in crafting, editing, and submitting competitive grant applications on behalf of the City include:

Program Request Amount Description
California Business,
Consumer Services and
Housing Agency –
Encampment Resolution
Fund
$5,427,000 – PENDING
(evaluating if the changed
circumstances impact
eligibility)
Funding to be used for
encampment clean up and
connecting homeless individuals
to supportive services.

Item 11
Attachment B - Townsend
Public Affairs Update
Memo

Item 11: Staff Report
Pg.
12 Packet Pg. 127 of 227

7 6
4 8
1 Program Request Amount Description
MTC – Transit Oriented
Communities
$3,100,000 – PENDING Application for additional electric vehicle charging stations to be
installed within the City.

CalRecycle Beverage
Container Recycling
Grant
$165,000 – PENDING Application to install publicly
accessible water refill stations
throughout the City’s public
spaces.

CalOES State and Local
Cyber Security Grant
Program
$250,000 – NOT AWARDED Funding to be used to improve
local cybersecurity infrastructure
capabilities to prevent fraud and
attacks.

Bureau of State and
Community Corrections –
Organized Retail Theft
Grant
$5,176,812 – AWARDED Successfully awarded to assist
the City in combatting organized
retail theft occurrences through
increased public safety resource
coordination.

Item 11
Attachment B - Townsend
Public Affairs Update
Memo

Item 11: Staff Report
Pg.
13 Packet Pg. 128 of 227

City Council
Staff Report
From: City Manager
Report Type: ACTION ITEMS
Lead Department: Administrative Services
Meeting Date: January 13, 2025
Report #:2412-3846
TITLE
Review and Accept the FY 2026-FY 2035 Long Range Financial Forecast (LRFF) and FY 2026 Budget Development Guidelines as Recommended by the Finance Committee, CEQA Status – Not a Project

RECOMMENDATION
The Finance Committee and Staff recommend the City Council accept the General Fund Long Range Financial Forecast (LRFF) for Fiscal Year 2026-2035 (Attachment I) and the FY 2026 annual Budget Development Guidelines (Attachment A in Attachment I) and direct staff to use this forecast as the starting point for the initiation of the FY 2026 budget process.

EXECUTIVE SUMMARY
The FY 2026-2035 Long Range Financial Forecast (LRFF) was reviewed with the Finance Committee on December 3, 2024 (Attachment I) along with the annual Budget Development Guidelines (Attachment A in Attachment I) and were unanimously approved by the Committee.

The Base Case Long Range General Fund forecast projects a shortfall of $12.0 million in FY 2026, followed by shortfalls ranging from $7.9 million in FY 2027 down to $5.6 million in FY 2029.

These amounts are fairly consistent with previous projections used as part of the two-year budget balancing strategy when adopting the FY 2025 Budget; however, the FY 2026 shortfall increased by $1 million due to various factors outlined in Attachment I. The proposed multi- year financial strategy addresses the FY 2026 shortfall of $12 million with uncertainty reserves of $6.1 million remaining for FY 2026 budget planning1 and $5.9 million from the FY 2024 Year- end review2. This report summarizes the key discussion points with the Finance Committee and 1 FY 2025 Adopted Operating Budget: Page 10 General Fund Budget Balancing Strategy:
https://www.cityofpaloalto.org/files/assets/public/v/1/administrative-services/city-budgets/fy-2025-city- budget/adopted/palo-alto-adopted-operating-budget-book_final2.pdf 2 December 3, 2024 Finance Committee Meeting, FY 2024 Annual Comprehensive Financial Report (Staff Report 2404-2912): https://portal.laserfiche.com/Portal/DocView.aspx?id=111742&repo=r- 704298fc&searchid=48b115cb-ca8e-4d8c-8fb4-bebeceeb6c24
Item 12
Item 12 Staff Report

Item 12: Staff Report
Pg.
1 Packet Pg. 129 of 227

includes additional information to provide context and/or additional data points of reference to the City Council. Lastly, Budget Development Guidelines inform the development of the FY 2026 budget; these are discussed at the end of the LRFF document (Attachment A in Attachment I).

Per City Council policy, items that are unanimously approved by the Finance Committee are placed as a consent agenda item for the City Council. Though this report was approved unanimously, staff and the Committee have placed this item on the City Council’s action agenda for deliberation of the full Council in acknowledgement of the importance for financial planning in the continued variable economic conditions.

BACKGROUND
The LRFF is a preliminary ten-year forecast based on the most current information available, actual revenues for FY 2024, and projected results through FY 2025 at the point in time of release (December 2024). General Fund expenditures are based on current City Council approved service levels (Base Case) compared to projected revenues over the next ten years.

This Forecast allows staff and City Council to look at both the short-term and long-term financial status of current service levels in the General Fund to inform daily policy decisions and evaluate long-term goals and ongoing challenges. The Committee and staff recommend use of the Base Case for the FY 2026 Budget planning.
•Base Case Long Range General Fund forecast projects a shortfall of $12.0 million in FY 2026, followed by shortfalls ranging from $7.9 million in FY 2027 down to $5.6 million in FY 2029. FY 2030 has a surplus of $2.0 million which continues to grow through FY 2035.

This forecast maintains current service levels approved in FY 2025 and should be used for planning purposes to assist in gauging effects of major policy interventions against a likely “status quo” version of the future. These amounts are fairly consistent with previous projections used as part of the two-year budget balancing strategy when adopting the FY 2025 Budget; however, the FY 2026 shortfall increased by $1 million due to various factors outlined in Attachment I.
•Alternate forecast scenario that reflects a 1% loss in economically sensitive revenue.

Compared to the Base Case, this scenario reduces revenues by $2.3 million in FY 2026 and maintains and increases the projected shortfalls over the next ten years, ranging from $14.3 million in FY 2026 to $0.8 million in FY 2030. FY 2031 begins a surplus of $5.8 million which continues to grow through FY 2035.
•Alternate forecast that reflects a 1% compensation adjustment (1%) in FY 2026.

Compared to the Base Case, this scenario increases expenses by $1.1 million in FY 2026 and maintains and increases projected shortfalls over the next ten years, ranging from $13.1 million in FY 2026 to $6.8 million in FY 2029. FY 2030 begins a surplus of $0.8 million which continues to grow through FY 2035.

Item 12
Item 12 Staff Report

Item 12: Staff Report
Pg.
2 Packet Pg. 130 of 227

These alternate forecasts were calculated with 1% impacts to demonstrate funding levels that could be used to scale the scenarios for larger potential impacts. In addition, these scenarios were calculated separately to show the impacts of each scenario in isolation; however, aspects of both alternate forecasts may occur in conjunction in the future.

Consistent with the projections in the FY 2025 Adopted Budget, this LRFF reflects deficits in the near term with revenues falling below expenses. As previously recommended, the shortfall in FY 2025 will be addressed by the Uncertainty Reserve, that was proactively set aside during the prior year for this purpose. Development of the FY 2026 budget and planning for the subsequent years outlined in the forecast will need to be done strategically over the next several months to balance the increased service level desired by the community with the financial resources currently projected. With these variables, ongoing revenues are unable to keep pace with expenses over the next several years.

The LRFF is a tool to model financial forecasting assuming resources and services are operating at the current authorized levels. City staff will continue to review and refine these projections to establish the FY 2026 budget and use this forecast to begin internal planning for budget balancing solutions. Individual fiscal years will vary from this forecast such as changes in revenue estimates or operating transfers. These circumstances, specific to a given year, typically represent one-time resources that are factored into the annual budget planning process.

ANALYSIS
Finance Committee Review
As part of the Finance Committee’s review of the LRFF, several topics were discussed more in depth and staff has provided additional information for context and/or additional data points for reference to the City Council.
•Revenue categories volatility in the past – The potential national economic conditions and shifting policies cause challenges in forecasting revenues for the upcoming period.

Revenue categories in the city’s budget have demonstrated significant volatility during periods of economic downturn such as the COVID pandemic and Great Recession.

Historical data shows that during the Great Recession of 2008 and 2009, revenue decreases ranged from a sharp -4% in the first year to a more moderate -1% in the second year across certain major tax revenues that are more economic sensitive, particularly sales tax, transient occupancy tax, and documentary transfer tax. This pattern underscores the potential for varying magnitudes of revenue loss depending on the severity and duration of the economic disruption. For context, for FY 2026, a 1% decrease in these more economic sensitive major tax revenues is roughly equivalent to a reduction of $1.7 million of resources for the city. This experience band provides a useful framework for scaling potential revenue impacts, suggesting that while Item 12
Item 12 Staff Report

Item 12: Staff Report
Pg.
3 Packet Pg. 131 of 227

immediate losses can be substantial, the long-term effects may moderate with economic recovery. While staff currently do not forecast a recession, the city remains prepared for the possibility of revenue reductions through fiscal diligence and planning. •Vacancies – For the FY 2026 to 2035 budgetary outlook, one significant assumption is the city's vacancy rate. Our financial forecast currently assumes a 5% vacancy factor, up from the previous 3%, which has tightened the overall budget. The City’s current vacancy rate of 10% reflects a decrease from the pre-COVID level of 12%. Vacancy savings is typically used through alternative expenses such as overtime or contractual services to maintain or manage service levels or allow for flexibility to support Council priority workplans. Public safety vacancy savings is offset with overtime to maintain safety service levels. As of the date of this report, the Police department has zero vacancies and citywide recruitment and retention continue to improve. For context, in FY 2024, the budget assumed vacancy savings of 3%; at the end of FY 2024, net vacancy savings of $2 million translate to just approximately 1% of the salary and benefits expenditures. Setting the vacancy assumption too high could lead to unrealistic target and may result in expenditures exceeding budgeted amount if vacancies are not realized.
•Uncertainty Reserve – The Uncertainty Reserve (UR) was established as part of the FY 2023 Mid-Year Budget Review as a one-time source of funds of $14 million to bridge the funding needed to address community service needs in FY 2024 and FY 2025. The UR differs slightly from the Budget Stabilization Reserve (BSR) in that it can be approved for use with a simple majority vote rather than a 2/3 approval by Council. The UR is also meant to fund short-term budget gaps, while the BSR is meant to be maintained for emergency financial needs and critical budget adjustments needed throughout the fiscal year.

As part of the budget development strategy for the FY 2024 and FY 2025 adopted budgets, the UR was used to fund shortfalls to maintain services and maintain the BSR at 20% in FY 2024 and 18.5% in FY 2025. Adoption of the FY 2025 Budget left $6.1 million in the UR to use for development of the FY 2026 Budget. Staff is recommending increasing the UR to $12.0 million by shifting $5.9 million in surplus savings from FY 2024 from the BSR to the UR. The $12.0 million UR could be used to balance the full $12.0 million shortfall projected in FY 2026 as part of the 2026-2035 LRFF. However, this course of action will eliminate the UR as a strategy to solve the projected $7.9 million gap in FY 2027, unless higher revenues, cost savings and/or other one-time resources are available.

Item 12
Item 12 Staff Report

Item 12: Staff Report
Pg.
4 Packet Pg. 132 of 227

•Risk Mitigation Tools – In addition to the UR discussed above, there are several other tools that staff will explore to reduce the anticipated shortfall in FY 2026 and maintain more fiscal stability in the outer years of the LRFF. These other tools may include:
oInvestigating and recommending updates to existing revenue sources and/or new revenue sources that the City has not collected previously. The City is currently conducting a citywide cost of service study to update its municipal fees and also to identify any revenue sources that are not currently collected.

Depending on the nature of the new revenues, it will take time to conduct the necessary analysis, public outreach and implement the new revenue. oReviewing implementation of policies related to the BSR and funding long term liabilities such as pensions and retiree healthcare, and potentially rebalancing the funding from these priorities to increase funding for current services. The BSR is recommended to be maintained at 18.5% of the General Fund expense budget, but the funding level could be reduced closer to the lower end of the targeted 15 to 20% range. Similarly, the proactive funding for long term liabilities could be reduced in order to fund current services; however, this would prolong the City’s efforts to pay down the costs related to pension and retiree healthcare.
oUsing financing strategies such as Certificate of Participation (COP) to fund costs related to new capital infrastructure projects. These financing strategies could re-allocate funding dedicated to capital needs, such as reducing the base transfer from the General Fund to the Capital Fund and putting those funds towards operating services and maintenance/upkeep of current infrastructure. There would be associated costs for debt administration and longer-term repayment may ensure the City could maintain fiscal sustainability with this strategy. oReviewing service delivery models, approaches and/or innovations to reduce costs or enhance capacity with current resources. While this analysis is performed in each budget development cycle, it will be re-emphasized. •Fiscal discipline – Over the past couple years, the City has been strategically increasing service levels to invest in Council priorities. However, in order to maintain these service levels ongoing as the economy and financial resources stagnate coupled with potential higher uncertainty, continued fiscal discipline will need to be exercised throughout the FY 2026 budget development. Priorities not funded will need to be evaluated against current services to determine if the current services should be augmented with existing and/or additional resources. As stated in the 2026-2035 LRFF report, development of the FY 2026 budget and planning for the subsequent years outlined in the forecast will need to be done strategically over the next several months to balance the increased service level desired by the community with the financial resources currently projected.

Item 12
Item 12 Staff Report

Item 12: Staff Report
Pg.
5 Packet Pg. 133 of 227

The City needs to maintain fiscal discipline and agility while monitoring the upcoming federal policies and their impacts on national and local economies.

FISCAL/RESOURCE IMPACT
Financial implications from this report and input from the City Council will be considered in the City Manager’s development of the Fiscal Year 2026 budget. Upcoming milestones related to the City’s fiscal standing and the FY 2026 Budget Process include:
•February (Council) – FY 2025 Mid-Year Budget Review and Second Quarter Financial Report
•March/April (Finance Committee and Utilities Advisory Commission or UAC) – Five Year Utility Financial Plans and FY 2026 Utility Rate Recommendations •April/May (Finance Committee) – Citywide Cost Allocation Plan and Municipal Fee Study •May (Council) – FY 2026 Proposed Operating and Capital Budgets Published •May (Finance Committee) – FY 2026 Proposed Budget Hearings, including Utility Rates, Municipal Fees, and Five-Year Capital Improvement Plan
•June (Finance Committee) – FY 2025 Third Quarter Financial Report •June (Council) – Adoption of the FY 2026 Operating and Capital Budgets, Utility Rates, and Municipal Fees.

STAKEHOLDER ENGAGEMENT
The preliminary forecast for FY 2026 represents the beginning of the fiscal year 2026 budget development process. As in previous years, City Council discussion of the LRFF will provide guidance to staff in the budget development process. It is anticipated that conversations with City Council and the community will occur through public budget hearings in Spring 2025, according to the standard budget adoption process.

ENVIRONMENTAL REVIEW
This report is not a project for the purposes of the California Environmental Quality Act.

Environmental review is not required.

ATTACHMENTS
Attachment I: FY 2026-2035 Long Range Financial Report (LRFF), CMR 2405-3068 APPROVED BY: Lauren Lai, Administrative Services Director Item 12
Item 12 Staff Report

Item 12: Staff Report
Pg.
6 Packet Pg. 134 of 227

CITY OF PALO ALTO
Finance Committee
Regular Meeting
Tuesday, December 03, 2024
Agenda Item

2. Review and Forward Fiscal Year 2026-2035 Long Range Financial Forecast (LRFF) to City Council Late Packet Report, Staff Presentation
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
7 Packet Pg. 135 of 227

4 7
7 6
Finance Committee
Staff Report
From: City Manager
Report Type: ACTION ITEMS
Lead Department: Administrative Services
Meeting Date: December 3, 2024
Report #:2405-3068
TITLE
Review and Forward Fiscal Year 2026-2035 Long Range Financial Forecast to City Council

RECOMMENDATION
Staff recommends that the Finance Committee review and recommend that the City Council accept the General Fund Long Range Financial Forecast (LRFF) for Fiscal Year 2026-2035 and the FY 2026 annual Budget Development Guidelines (Attachment A) and direct staff to use this forecast as the starting point for the initiation of the FY 2026 budget process.

EXECUTIVE SUMMARY
Annually, the City presents a ten-year General Fund Long Range Financial Forecast (LRFF) in December that marks the beginning of the annual budget process. This preliminary forecast is based on the most current information available, actual revenues and expenses for FY 2024, and projected results through FY 2025 at the point in time of release. General Fund expenditures are based on current City Council approved service levels compared to projected revenues over the next year. The City service levels have increased during the 3-year period between FY 2024 to FY 2026, as the City continues to maintain a multi-year budget strategy, deliver excellent service level while supporting Council priority objectives and maintaining fiscal stability with anticipated upcoming volatility. The current outlook anticipates a modestly weak economy in 2025, followed by a gradual return to trend growth rates starting in 2026, assuming inflation continues to moderate, and consumer demand remains stable.

The Base Case Long Range General Fund forecast projects a $12.0 million shortfall in FY 2026, followed by shortfalls ranging from $7.9 million in FY 2027 to $5.6 million in FY 2029. FY 2030 has a projected surplus of $2.0 million which continues to grow through FY 2035. This forecast maintains current service levels approved in FY 2025 and should be used for planning purposes to assist in gauging effects of major policy interventions against a likely “status quo” version of the future. These amounts are fairly consistent with previous projections used as part of the two-year budget balancing strategy when adopting the FY 2025 Budget, however, the FY 2026 shortfall increased by $1 million due to the various factors discussed in detail below. The proposed multi-year financial Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
8 Packet Pg. 136 of 227

4 7
7 6
strategy addresses the FY 2026 shortfall of $12 million with uncertainty reserves of $6.1 million from FY 2023 Mid-Year review and $5.9 million from FY 2024 Year-end review.

Staff modeled an alternate forecast scenario that reflects a 1% loss in economically sensitive revenue and the impact on the General Fund over the forecast period.

Compared to the Base Case, this scenario increases the General Fund shortfall over the next ten years. FY 2026 changes from a shortfall of $12.0 million to $14.3 million, and revenues are not anticipated to be able to fund the annual expenditures until FY 2031.

Staff modeled an alternate forecast that reflects a one-time compensation adjustment (1%) in FY 2026 and the impacts on the General Fund over the next ten years. Compared to the Base Case, this scenario increases expenses by $1.1 million in FY 2026 and increases projected shortfalls in the forecast, ranging from $13.1 million in FY 2026 to $6.8 million in FY 2029. FY 2030 has a projected surplus of $0.7 million which continues to grow through FY 2035.

These alternate forecasts were done separately to show the impacts of each scenario in isolation; however, aspects of both alternate forecasts may occur in conjunction in the future.

Consistent with the projections in the FY 2025 Adopted Budget, this LRFF reflects deficits in the near term with revenues falling below expenses. As previously recommended, the shortfall in FY 2025 will be addressed by the Uncertainty Reserve, that was proactively set aside during the prior year for this purpose. Development of the FY 2026 budget and planning for the subsequent years outlined in the forecast will need to be done strategically over the next several months to balance the increased service level desired by the community with the financial resources currently projected. With these variables, ongoing revenues are unable to keep pace with expenses over the next several years.

The LRFF is a tool to model financial forecasting assuming resources and services are operating at the current authorized levels. City staff will continue to review and refine these projections to establish the FY 2026 budget and use this forecast to begin internal planning for budget balancing solutions. Individual fiscal years will vary from this forecast such as changes in revenue estimates or operating transfers. These circumstances, specific to a given year, typically represent one-time resources that are factored into the annual budget planning process. More detailed guidelines or Budget Policies to inform the development of the FY 2026 budget are discussed at the end of this document (Attachment A).

Included in this report and subsequent documents are the following:
 The Economy: discussion of the current financial climate of the United States to the local economy of the City of Palo Alto (details can be found in Attachment B)  Summary Long Range Financial Forecast including Revenue and Expense assumptions in FY 2026-2035 (details can be found in Attachments C and D)  Financial status of the General Fund as of the FY 2025 Adopted Budget Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
9 Packet Pg. 137 of 227

4 7
7 6
 Brief discussion of FY 2024 surplus funding
 Updated revenue assumptions based on current projections  FY 2026 Budget Development Guidelines to inform the Budget process (Attachment A)  Summary of Assumptions Not Included in Forecast (Attachment E)  Alternate scenarios to the base case forecast to demonstrate financial impacts to the City from:
 Impacts from a moderate recession
 Impacts from a citywide 1% increase of salaries and benefits

BACKGROUND
Annually the Office of Management and Budget produces a ten-year General Fund Long Range Financial Forecast (LRFF). The LRFF reflects staff’s best estimates on the projected revenues and expenditures over the next ten years based on the information that is currently available. It is important to note that the LRFF is a planning document and is separate and distinct from the development of the City’s annual Operating and Capital Budgets. There are assumptions and parameters modeled in the LRFF, and these assumptions are revised and refined as more information becomes available through the budget development process.

The LRFF contains a high-level comprehensive review of the costs to provide current City Council approved service levels, including current contracts, updates to salaries and benefits based on the current population of employees, and the current labor contracts in effect. The LRFF also reviews the status of the current economy and various economically sensitive revenues such as Sales Tax, Documentary Transfer Tax, Property Tax, and Transient Occupancy Tax to explain key trends in those areas. This Forecast allows staff and City Council to look at both the short-term and long-term financial status of current service levels in the General Fund to inform daily policy decisions and evaluate long-term goals and ongoing challenges.

The Economy
The economy continues to demonstrate resiliency to a formal recession and this forecast reflects a continued level of stagnation offset by inflation. Risks remain due to world conflicts and potential local economy impacts. At the national level, economic growth through the third quarter of calendar year 2024 has been driven by resilient consumer spending, although inflationary pressures remain elevated and borrowing costs continue to weigh on economic activity. The Federal Reserve’s monetary policy actions have kept interest rates at historically high levels, with the federal funds rate holding near its highest levels in over two decades. The Fed is maintaining its tight stance in an effort to achieve a “soft landing”, aiming for a slowdown in economic growth that avoids recession while containing inflation. Despite these efforts, inflation remains sticky, particularly in sections such as housing and services, leading to ongoing economic uncertainty. The current outlook anticipates a modestly weak economy in 2025, followed by a gradual return to trend growth rates starting in 2026, assuming inflation continues to moderate and consumer demand remains stable. Risks that will continue to be monitored include escalating political tensions, and political landscape shaped by the recent presidential election, all of which could lead to shifts in national economic policies in 2025 and beyond. These factors are creating heightened complexity in financial forecasting and budget development. The Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
10 Packet Pg. 138 of 227

4 7
7 6
City must navigate the challenge of addressing growing fiscal needs while ensuring long-term fiscal sustainability.

Nationally, as of October 2024, the consumer price index (CPI) which measures changes in the prices paid by consumers for a basket of goods and services, is 2.6%, down from 3.7% in October 2023, but still indicating persistent inflation. Assumptions in the LRFF report for general cost increases are using a CPI of 3% in FY 2026 and FY 2027 and 4% for FY2028 and beyond. The unemployment rate stands at 4.1% up from 3.7% in January of 2024, signaling a potential economic slowdown. Despite these pressures, GDP, a measure of all goods and services produced in the economy, grew at an annualized rate of 2.8% through third quarter of 2024, driven primary by strong consumer spending. The UCLA Anderson outlook predicts weak economic growth in 2025, with GDP growth expected to range from 1% to 2%, with a return to trend growth of 2% to 3% starting in 2026.

Locally, the economy continues to show resilience, with no recession expected due to strong employment. However, real personal income is projected to remain flat in 2024, with modest growth of 1% to 2% forecasted through 2025. California’s unemployment rate has risen to the

5.3% slightly above the 5.0% level at the same time last year. It is important to recognize that while the local economy within the City may exhibit trends similar to those at the state or national levels, its unique economic makeup will result in distinct variations. Staff is using the current available information to inform this forecast, which will change as new information becomes available and adjustments may be necessary to reflect evolving conditions. Additional details on economic statistics such as Gross Domestic Product (GDP), unemployment, and Consumer Price Index (CPI) can be found in Attachment B in greater length.

ANALYSIS
Palo Alto serves a diverse community with a broad range of unique services that adds to the complexity of managing a balanced budget and healthy fiscal outlook. This annual General Fund Long Range Financial Forecast is being developed at a time of perceived economic stagnation and geo-political unrest. It is important to recognize that while the local economy within the City may exhibit trends similar to those at the state or national levels, its unique economic makeup may result in distinct variations. As new information becomes available, adjustments may be necessary to reflect evolving conditions.

As with all forecasts, there is uncertainty regarding the revenue and expenditure estimates contained in this document. Instead of a recession, this forecast assumes economic stagnation at the beginning of the ten-year period, in line with current projections from UCLA Anderson.

Major tax revenues have rebounded from the impacts of the Covid-19 pandemic and projected to be at or above pre-pandemic levels through the ten-year forecast. Expenses are programmed to maintain service levels based on Council approval. As a result, some limited term programs are not extended through the entire ten-year forecast but discussed in this report to indicate that continuing the programs would require additional resources. Investments in Capital projects are consistent with the 2025-2029 Capital Improvement Plan with continued focus on Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
11 Packet Pg. 139 of 227

4 7
7 6
completing the Council approved 2014 Infrastructure Plan projects as well as maintaining and upkeeping the City’s current facilities and infrastructure. The Uncertainty Reserve that was established as part of the FY 2023 Mid-Year Review was used to balance the FY 2025 Adopted Budget, but as planned and approved by Council, still has funding available to solve the projected shortfall in FY 2026. Strategic planning and fiscal discipline will be needed to solve the estimated shortfalls in the subsequent years of the forecast.

Base Case
Table 1 displays the projected General Fund revenues and expenditures over ten years and the cumulative net operating margin. The operating margin reflects the variance between the projected General Fund revenues and expenditures for each year of the forecast or the annual surplus or shortfall. The net operating margin is presented on a one-time basis, as the annual surplus or shortfall for a given year, and on an incremental basis. The incremental forecast assumes that each shortfall is addressed completely with ongoing solutions in the year it appears and that each surplus is completely expended with ongoing expenditures. It is the City’s goal to remain in balance on an ongoing basis, so the incremental figure is useful to illustrate the additional surplus and/or shortfall attributed to a particular fiscal year. To the extent a shortfall is not resolved, or a surplus is not expended on an ongoing basis, it is important to understand that the remaining budget shortfall or surplus will remain and be pushed to the following year. The Base Case financial forecast projects a shortfall of $12.0 million in FY 2026, followed by shortfalls ranging from $7.9 million in FY 2027 down to $5.6 million in FY 2029. FY 2030 has a projected surplus of $2.0 million which continues to grow through FY 2035. Based on these assumptions, the cumulative net operating margin, or ongoing surplus, during the forecast period is a surplus of $25.4 million.

TABLE 1: FY 2026 – 2035 Long Range Financial Forecast (Base Case) Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
12 Packet Pg. 140 of 227

4 7
7 6
TABLE 2: FY 2026 – 2035 Long Range Financial Forecast Net Operating Margin (Base Case) Revenue Assumptions
The FY 2024 Annual Comprehensive Financial Report (ACFR), scheduled for review by the Finance Committee on December 3, 2024, reported General Fund revenues as compared to the prior year; most major tax revenues experienced growth back to pre-pandemic levels due to the improved local economy, high price trends, and inflation (CMR 2404-29121). Major tax revenues have continued to grow moderately through the first quarter (Q1) of FY 2024 and is projected to come in at the FY 2025 Adopted Budget level totaling 287.6 million. Further discussion of changes to specific categories can be found in Attachment C. Overall, revenues are projected to increase by $11.0 million in FY 2026, mainly in Property Tax, Transient Occupancy Tax, and Utility Users Tax. As part of the FY 2025 Mid-Year Budget Review, staff will be returning to Council to recommend using the FY 2024 budget saving to increase the budget uncertainty reserve to help mitigate impacts from a potential recession, as well as smooth the near-term shortfalls seen in this LRFF. A summary of revenue assumptions is discussed here, extensive information regarding each revenue category can be found in Attachment C.

Tax revenues constitute approximately 60% of General Fund resources. In FY 2026, the forecast projects a $7.6 million or 4.5% increase from FY 2025 projected levels ($169.8 million to $177.4million). This increase is primarily attributed to higher anticipated receipts across all categories, with Property Tax, Transient Occupancy Tax (TOT), and Utility Users Tax (UUT) accounting for the largest increases.
 Property Taxes makes up the largest source of General Fund’s revenue, approximately 25%. In FY 2026, this revenue is anticipated to increase $3.1 million or 4.5% from FY 2025 ($68.6 million to $71.7 million). Steady residential property sales resulting in higher property tax assessed valuation is projected to continue to grow this source annually.
1Finance Committee, December 3, 2024; Agenda Item #2; Staff Report #2404-2912, https://cityofpaloalto.primegov.com/portal/viewer?id=9637&type=3 Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
13 Packet Pg. 141 of 227

4 7
7 6
 Transient Occupancy Taxes are impacted by business and other leisure/non-leisure travel and experienced significant reductions in the past few years due to a number of factors resulting from the pandemic. However, this revenue was able to return to pre- pandemic levels in FY 2023. In FY 2026, this revenue is anticipated to increase $1.3 million or 4.6% from FY 2025 ($27.9 million to $29.1 million).  Utility Users Tax (UUT) is levied on electric, gas, and water consumption, as well as telephone usage. Revenue in this category is impacted by consumption levels and has continued to recover as the local economy recovered and workers returned to the office starting in FY 2023. In FY 2026, UUT revenue is anticipated to increase by $1.6 million or

7.9% from FY 2025 ($19.9 million to $21.5 million).

The forecast for non-tax revenues projects a $3.5 million or 3.9% increase in FY 2026 from FY 2025 adopted levels. This increase is primarily attributable to charges for services and investment income. These increases are partially offset by decreases in limited term revenue from other agencies such as the Staffing for Adequate Fire and Emergency Response (SAFER) Grant Program and decreased reimbursement revenue from other funds for centralized and administrative services.

The changes by revenue category can be seen in Tables 3 and 4 below. Major tax revenue trends are shown in Table 5 and discussed in greater detail in Attachment C.

TABLE 3: General Fund Revenue Forecast
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
14 Packet Pg. 142 of 227

4 7
7 6
TABLE 4: General Fund Revenue Forecast Year to Year Percentage Change TABLE 5: City of Palo Alto Major General Fund Revenues
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
15 Packet Pg. 143 of 227

4 7
7 6
Expense Assumptions
As part of developing the FY 2026-2035 Forecast expenditure budget, the General Fund expense categories have been adjusted by removing FY 2025 Adopted Budget one-time expenses and updating major cost elements such as salary and benefits costs. Table 6 below displays the expense forecast and when compared to the FY 2025 Adopted Budget, growth of 4.2% is expected in FY 2026. The overall annual growth is due mainly to increases in expense categories such as Salary and Benefits, Contractual Services, and Transfers to Other Funds.

A summary of expense assumptions is discussed here, extensive information regarding each expense category can be found in Attachment D.
 Salary and Benefits are projected to increase $8.4 million or 4.7% from the FY 2025 ($179.9 million to $188.3 million). This is primarily attributable to increases salaries ($4.5 million), retiree healthcare costs ($1.9 million) and pension costs ($1.4 million).  A general wage adjustment of 2% is included for all employees starting in either January 2025 or July 2025 for all years of the forecast since no MOA’s would be in effect at that time.
 A reserve is included for potential changes to future labor costs including, changes in vacancy rates, labor and benefit rate variability, and inflation assumptions.  A staff vacancy assumption of 5% is assumed, which is an increase from 3% assumption most recently a few years ago, creating a tighter budget forecast as the City continues to improve its actual vacancy rate through successful recruitment and retention programs.
 Long Term contributions to pension and other post-employment benefits reflect increases over the prior year and capital investments are being phased through the first three to five years of the forecast:
 Pension 115 Trust contributions are calculated using a lower 5.3% discount rate for normal cost as compared to CalPERS 6.8%. Through FY 2025, it is expected that $87.4 million ($56.4 million in the General Fund) in supplemental principal contributions will be made to the Pension Trust. The FY 2026 budget estimates $14.1 million ($8.5 million in the General Fund) in supplemental contributions, a $0.2 million or 1.0% decrease from FY 2025 Adopted levels of $14.2 million. This slight reduction is the result of the economic and demographic assumptions used in the annual CalPERS Valuation reports, including but not limited to investment returns.
 California Employers’ Retiree Benefit Trust (CERBT) Fund contributions for Retiree medical costs are calculated using a lower 5.75% discount rate as compared to a

6.25% assumption. Through FY 2025, it is expected that $14.7 million in supplemental principal contributions will be made to the CERBT Trust. The FY 2025 Budget estimates $12.4 million in the General Fund for ADC, an approximate $1.9 million or 18.4% increase from FY 2025 levels of $10.5 million.  Capital Infrastructure transfers reflect the goal established as part of the 2022- 2026 Capital Improvement Plan (CIP) to restore the base portion of this transfer to pre-pandemic levels by FY 2026. The local economy has recovered from the Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
16 Packet Pg. 144 of 227

4 7
7 6
COVID-19 pandemic, and estimated transfers from TOT revenues in FY 2026 are currently projected to increase to $14.2 million and the base transfer to increase to $17.2 million, along with estimated interest earnings of $2.0 million, for a total $33.4 million transfer to the Capital Improvement Fund.  Inflationary assumptions in this long range reflect lower inflation being seen at present.

A 3% annual inflation is assumed in FY 2026 and FY 2027 and increases to 4% in FY 2028 through the end of the ten-year forecast to estimate cost increases for non-salary services and equipment.
 Some limited term programs are not extended through the entire ten-year forecast, but discussed later in this report to indicate that continuing the programs would require additional resources. This LRFF also includes the City’s committed investment of $7.0 million in operating expenses for the partnership with LifeMoves and Project Homekey site services ($1.0 million annually from FY 2025 through FY 2031). The timing of the funding was shifted as a result of $2.0 million from FY 2023 and FY 2024 being approved by the Council to be used to fund expenses related to the Homekey Facilities capital project (PE-24005). Staff will monitor operating funding needs in FY 2025 to align allocations based on the timing of the completion of PE-24005.

TABLE 6: General Fund Expense Forecast and Year to Year Percentage Change Budget Stabilization Reserve
The City's Budget Stabilization Reserve (BSR) serves as the primary General Fund reserve. By policy, the BSR is maintained in the range of 15 to 20% of General Fund operating expenditures, with a target of 18.5%. As part of the FY 2025 Adopted Budget, the Council approved a targeted BSR of 18.5% or $54.4 million as part of the budget balancing strategy. Any reduction to the reserve below 15% requires City Council approval. At the discretion of the City Manager, any BSR balance above 18.5% may be transferred to the Infrastructure Reserve (IR) in the Capital Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
17 Packet Pg. 145 of 227

4 7
7 6
Improvement Fund and the City's Section 115 Pension Trust Fund, as outlined in the Retiree Benefit Policy. The BSR is used to fund unanticipated one-time costs as opposed to ongoing or recurring operating expenditures; ongoing revenue or expense trends are updated as part of the annual budget process to adjust ongoing needs. The City's intent is to fund ongoing programs and services with ongoing dollars. Maintaining the BSR at 18.5% or higher provides flexibility for the City to deal with unforeseen issues that may arise. Furthermore, establishing, and following, sound fiscal reserve policies has been a strong factor in the City being rated AAA by rating agencies.

Based on information reported in the FY 2024 Annual Comprehensive Financial Report (ACFR) CMR 2404-2912 2, the City’s current BSR balance is $65.9 million, approximately $8.9 million above the 18.5% target of $54.4 million for FY 2025. The proposed allocations are for the Capital Fund Infrastructure Reserve (IR) of $3.0 million and Budget Uncertainty Reserve of $5.9 million. While it is a departure from the current policy, this allocation provides flexibility to fund capital cost uncertainties and adequate funding to address the projected FY 2026 budget shortfall, ensuring the City maintains high quality service level. Staff anticipates returning to Council in February 2025 with the FY 2025 Mid-Year Review and recommendations in alignment with the allocation below for the appropriation of BSR funds above the 18.5% level. These actions will leave the BSR at $54.4 million per the 18.5% Council recommended level. 2Finance Committee, December 3, 2024; Agenda Item #2; Staff Report #2404-2912, https://cityofpaloalto.primegov.com/portal/viewer?id=9637&type=3 Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
18 Packet Pg. 146 of 227

4 7
7 6
TABLE 7: Budget Stabilization Reserve (BSR) Summary (in millions) General Fund BSR Balance, June 30, 2024 $65.9
FY 2025 Approved Adjustments to the BSR Balance
FY 2025 Adopted Budget ($2.6)
Subtotal: Approved Adjustments to the BSR Balance ($2.6) Subtotal: BSR Balance, After Approved Adjustments $63.3 FY 2025 RECOMMENDED Adjustments to the BSR Balance
(to be appropriated in FY 2025 Mid-Year Budget Review)
Transfer to Infrastructure Reserve (IR) in the Capital Improvement Fund ($3.0) Increase Uncertainty Reserve ($5.9)
Subtotal: RECOMMENDED Adjustments to the BSR Balance ($8.9) Current Projected FY 2025 BSR Level, (June 30, 2025) $54.4 As mentioned previously, major tax revenues have continued to grow moderately through the first quarter (Q1) of FY 2025 in alignment with projections and are expected to come in at the FY 2025 Adopted Budget levels. In FY 2025, staff estimates total revenues to be consistent with the Adopted Budget of $287.6 million. Further discussion of changes to specific categories for FY 2026 can be found in Attachment C. Staff will continue to monitor revenues especially amongst significant sources with anticipated increases and decreases and provide another update in FY 2025 mid-year budget update (February 2025).

In addition to the BSR, funding of approximately $6.1 million remains in an Uncertainty Reserve that was established as part of the FY 2023 Mid-Year Review to fund the two-year budget strategy for FY 2024 and FY 2025. These funds are one-time in nature so once they are spent, they are not available for ongoing needs.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
19 Packet Pg. 147 of 227

4 7
7 6
Assumptions NOT Included in Forecast
It should be noted that this forecast does not include several potential impacts to the FY 2026- 2035 LRFF that are outlined in Attachment E. These items are known projects or areas of investment that are priorities but have not been fully developed in terms of costs and timelines.

This is not intended to be a comprehensive list nor in any priority order.

FY 2026 Budget Development Guidelines
As discussed earlier in this document, this preliminary forecast represents the initial steps of the FY 2026 budget development process. Due to the clear overlap of projecting the City’s fiscal condition and the need to shape service level expectations, staff recommends that the inclusion of Budget Development Guidelines be incorporated into the discussions at the beginning of an annual budget process. The FY 2026 Budget Development Guidelines, which are detailed in Attachment A, are meant to reflect the anticipated fiscal condition of the City and to provide high-level budgetary direction to the organization. These guidelines will shape and inform the annual financial planning and the allocation of resources across the organization, especially in the General Fund.

Pairing Budget Development Guidelines with the forecast at the beginning of the budget process links the anticipated fiscal condition of the organization with the necessary context regarding service delivery prioritization and resource allocation that will be further explored through the process. This also ensures that the City is able to proactively address anticipated changes in its fiscal condition through the budget process.

Conclusion
This forecast maintains current service levels approved in FY 2025 and should be used for planning purposes to assist in gauging effects of major policy interventions against a likely “status quo” version of the future. The level of uncertainty in this forecast is similar to where it was a year ago in terms of impacts from economic and geo-political uncertainty and evaluating potential impacts on the local economy. Expense savings and uptick in several revenue categories that occurred in FY 2024 caused a one-time surplus of $8.9 million. These revenue trends continue in the forecast, although increases in the near term may be flattened due to economic stagnation. Staff will return to Council in February 2025 with the FY 2025 Mid-Year Review, recommending that the $8.9 million surplus be allocated to the Infrastructure Reserve d ($3.0 million) and Budget Uncertainty Reserve ($5.9 million) to help bridge the FY 2026 budget gap, in accordance with Council policy allowing the City Manager to direct amounts exceeding the BSR target.

The LRFF Base Case assumes a weak economy in 2025, followed by a return to trend growth rates starting in 2026 and through the remaining ten-year forecast period. Revenue growth is anticipated to stagnate through the end of FY 2025, and potentially into FY 2026, as inflationary pressures remain elevated and borrowing costs continue to weigh on economic activity. As a result, the LRFF projects a shortfall of $12.0 million in FY 2026, followed by shortfalls ranging from Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
20 Packet Pg. 148 of 227

4 7
7 6
$7.9 million in FY 2027 to $5.6 million in FY 2029. FY 2030 has a projected surplus of $2.0 million which continues to grow through FY 2035. These amounts are fairly consistent with previous projections used as part of the two-year budget balancing strategy when adopting the FY 2025 Budget. Additionally, this LRFF projects $287.6 million in total revenues in FY 2025, consistent with the adopted budget.

Funding of approximately $6.1 million remains in an Uncertainty Reserve that was established as part of the FY 2023 Mid-Year Review to fund the two-year budget strategy for FY 2024 and FY 2025. This forecast includes the addition of $5.9 to the Budget Uncertainty Reserve, bringing the total amount of the reserve to $12.0 million, These funds are one-time in nature so once they are spent, they are not available for ongoing needs.

In addition to the Base Case Forecast, staff modeled alternate forecast scenarios that are discussed below. The first alternative reflects a 1% loss in economically sensitive revenue in FY 2026 compared to the Base Case, and increases the General Fund shortfall over the next ten years. FY 2026 increases from a shortfall of $12.0 million to $14.3 million, and revenues are not anticipated to be able to fund the annual expenditures until FY 2030. Staff also modeled an alternate forecast that reflects a 1% compensation adjustment and the impacts on the General Fund over the next ten years. The shortfall in FY 2026 increases by $1.1 million, the shortfall in FY 2027 grows to $9.0 million from $7.9 million in the Base Case. These alternate forecasts were done separately to show the impacts of each scenario in isolation; however, aspects of both alternate forecasts may occur in conjunction in the future.

Alternative Scenarios for Consideration
Alternative Forecast Scenario A: Economically Sensitive Revenue Loss This alternative forecast models the impact of a 1% revenue loss on economically sensitive revenue. Since it is difficult to predict the timing of a recession, this scenario shows the cost of a revenue loss in FY 2026 and how it would impact the subsequent years of the forecast. The major taxes, charges for services, and permits and licenses revenue categories are typically impacted by economic changes, so the impact has been calculated on these revenue sources. The 1% loss from these revenue sources would reduce the overall revenue in FY 2026 by $2.3 million. The Base Case projected that by FY 2030, the City would begin to have a positive surplus; this alternative forecast changes the surplus of $2.0 million in FY 2030 to a shortfall of $0.8 million.

In this alternative, the General Fund would have a shortfall of approximately $14.3 million in the first year of the forecast. The summary table for this alternative forecast and the Net Operating Margin graph for this alternative forecast are below.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
21 Packet Pg. 149 of 227

4 7
7 6
TABLE 8: FY 2026 – FY 2035 Long Range Financial Forecast Alternative Forecast A
TABLE 9: FY 2026 –2035 Long Range Financial Forecast Net Operating Margin Alternative Forecast A
Alternative Forecast B: One-time Compensation Adjustment, Additional 1% Consistent with City Council direction and past practice, the Base Case assumes a 2% general wage adjustment in the years beyond the terms of existing Memorandum of Agreements (MOAs). As of the timing of this forecast, MOAs are in effect through January 2025 (Service Employees International Union) (SEIU) and June 2025 (all other full-time labor groups). To support ongoing efforts for competitive wages and other terms of employment, the Base Case forecast includes a reserve for potential changes in new labor agreements, pension, or other benefits. Offering competitive compensation plans aligns with industry standards for attracting and retaining a skilled and motivated workforce and better positions the City of Palo Alto as an Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
22 Packet Pg. 150 of 227

4 7
7 6
employer of choice. This level of funding is intended to offset potential future costs and may differ from actual outcomes. Negotiations for new labor agreements are anticipated to occur in FY 2025 for new terms beginning in FY 2025 and FY 2026.

This alternative scenario models the impact of a one-time adjustment in FY 2026 to increase compensation by an additional 1% above assumptions in the Base Case; this is the first full fiscal year for new MOA terms with all labor groups. As with other assumptions in the LRFF, this model is for forecasting purposes and does not reflect future commitment.

The one-time compensation adjustment would increase expenditures in FY 2026 by $1.1 million.

The Base Case projected that by FY 2030, the City would begin to have a positive surplus; this alternative forecast increases the operating shortfalls in the near-term, resulting in budget gaps ranging from $13.1million in FY 2026 to $6.8 million in FY 2029. The summary table for this alternative forecast and the Net Operating Margin graph for this alternative forecast are below.

TABLE 10: FY 2026 – FY 2035 Long Range Financial Forecast Alternative Forecast B
TABLE 11: FY 2026 – 2035 Long Range Financial Forecast Net Operating Margin Alternative Forecast B
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
23 Packet Pg. 151 of 227

4 7
7 6

FISCAL/RESOURCE IMPACT
Financial implications from this report and input from the Finance Committee and City Council will be considered in the City Manager’s development of the Fiscal Year 2026 budget.

STAKEHOLDER ENGAGEMENT
The preliminary forecast for 2026-2035 represents the beginning of the fiscal year 2026 budget development process. Information provided in this report will be discussed with the City Council after the Finance Committee reviews and provides recommendations. Those conversations will provide direction to staff in the budget development process. It is anticipated that conversations with City Council and the community will occur through public budget hearings in Spring 2025, according to the standard budget adoption process.

The community can track previous and upcoming FY 2026 budget discussions and information at www.cityofpaloalto.org/budget

ENVIRONMENTAL REVIEW
This report is not a project for the purposes of the California Environmental Quality Act.

Environmental review is not required.

ATTACHMENTS
Attachment A: FY 2026 Budget Policy Guidelines
Attachment B: The Economy
Attachment C: General Fund Base Case Revenue Assumptions Attachment D: General Fund Base Case Expense Assumptions Attachment E: Assumptions Not Included in Forecast
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
24 Packet Pg. 152 of 227

4 7
7 6
APPROVED BY:

Lauren Lai, Administrative Services Director
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
25 Packet Pg. 153 of 227

Attachment A – FY 2026 Budget Development Guidelines

1) Develop a structurally balanced budget that brings ongoing revenues and expenses into alignment. Develop a plan for any structural imbalance to ensure that the City maintains fiscal sustainability over the short, medium, and long-term.

2) Allocate one -time resources for one -time needs rather than committing one -time resources to ongoing services. Examine appropriate uses of revenue surpluses that exceed forecasted levels such as planning for recession needs, restoration needs, and strategic investments.

3) Review resource allocation for the City Council’s existing priorities and identify priority funding needs.

4) Focus on business process redesign to enhance quality, flexibility, and cost-effectiveness of service delivery (include examining opportunities to streamline, simplify, reorganize, and reallocate resources to avoid duplication of effort).

5) Explore alternative service delivery models (such as partnerships with non -profits or other public/private sector groups) to minimize overlap, maximize cost share, and effectively use resources.

6) Continue to thoroughly analyze non -personnel/equipment/other costs, such as contract services, for cost savings opportunities or realignment with current needs.

7) Explore the expansion of existing revenue sources or the addition of new revenue sources, including the alignment of existing charges for services and the opportunity to establish new fees, when appropriate.

8) Continue to analyze and prioritize resource augmentations, seeking to offset augmentations with reductions elsewhere for net- zero impacts to the budget whenever possible; however, ensuring when resource augmentations are added, it is in alignment with one-time and ongoing forecasted sources.

9) Continue to prioritize proactively funding long term liabilities including but not limited to debt obligations, pension obligations, and capital infrastructure in accordance with City policies as approved by the City Council.

FY 2026 Budget Development Guidelines

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
26 Packet Pg. 154 of 227

ATTACHMENT B

The Economy

At the national level, economic growth through the third quarter of calendar year 2024, was led by GDP (gross domestic product) growth and strong consumer (retail) spending despite lower yet still higher than preferred inflation rate s and borrowing costs with interest rates . The gross domestic product (GDP), a measure of all goods and services produced in the economy, increased at an annualized rate of 2.8% in the third quarter of 2024 , in between the first quarter of 1.6% and second quarter of 3 .0% growth. As of October 2024, the consumer price index (CPI) , which measures changes in the prices paid by consumers for a basket of goods and services, was 2.6%.

This is lower than the 3.2% CPI from a year ago. Assumptions in the LRFF report for general cost increases are using a CPI of 3% in FY 2026 and FY 2027 and 4% for FY2028 and beyond. The unemployment rate, as of October 2024, is 4.1% which is up from 3.7% at the beginning of the 2024 calendar year and is consistent with a “soft-landing” economic slowdo wn. The unemployment rate in the past six months has been in the low 4% range as a result of the economy slowing down . As expected, the slowdown in economic growth intends to avoid recession for the purpose of stopping the economy from overheating and continuing to experience higher inflation. There are factors to monitor that could change the expected economic growth pattern such as the election results and changing national economic policies and geopolitical events.

The local economy continues to show sluggish performance in the calendar year 2024 with higher than U.S. growth expected in 2025 and 2026 led by technology and aerospace; however, recent election results has added additional market uncertainty to this outcome . The UCLA Anderson outlook states, “The California economy is expected to grow faster than the national economy in 2025 and 2026, but not by much. The risks to the fore cast are political and geopolitical, and on the downside, the interest rates could potentially still disrupt the current expansion and, on the upside, international immigration and accelerated onshoring of technical manufacturing could increase growth.”

According to the U.S. Bureau of Economic Analysis (BEA), t he US economy expanded an annualized 2.8% in the third (calendar) quarter of 2024, below 3% in the second quarter. Personal spending increased at the fastest pace since the first quarter of 2023 (2.8%), boosted by a 6.0% surge in consumption of goods and a robust spending on services, mostly prescription drugs, motor vehicles and parts, outpatient services and food services and accommodations.

Government consumption also rose more, led by defense s pending, and investment in equipment increased. In addition, the contribution from net trade was less negative, with increases in both exports and imports, led by capital goods, excluding autos. On the other hand, private inventories dragged from the growt h, and fixed investment slowed, led by a decline in structures and residential investment.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
27 Packet Pg. 155 of 227

Table 1: National Gross Domestic Product (GDP)
Real GDP: Percent Change from Preceding Quarter

U.S. Bureau of Labor Statistic

The national inflation rate remained steady but still slightly high compared to the 2% rate targeted by the federal reserve at 2.6% in October 2024, up from September (2.4%) which was the lowest rate since May 2020 (0.1%). It marks the first increase in inflation in seven months, as energy costs declined less, mainly due to gasoline and fuel oil while natural gas prices rose, the same as in September. Also, inflation for shelter steadied at 4.9%. On the other hand, inflation slowed for food and transportation and prices continued to fall for new vehicles and used cars and trucks. On a monthly basis, CPI rose by 0.2%, consistent with the previous three months. The index for shelter rose 0.4%, accounting for over half of the monthly increase. Meanwhile, core inflation remained steady at 3.3% as expected.

Table 2: National Inflation Rate (aka Consumer Price Index (CPI))

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
28 Packet Pg. 156 of 227

The nation’s unemployment rate is 4.1% as of October 2024, compared to a record high of 14.7% at the height of the pandemic in April 2020. The number of unemployed individuals was broadly unchanged at 7 million. Among those without employment, permanent unemployment rose slightly to 1.8 million, while temporary layoffs were little changed at 846,000. In turn, long-term unemployment was little changed from the previous month at 1.6 million. In the meantime, the labor force participation rate eased by 0.1 percentage points to 62.6%. Per the State of California's Employment Development Department, the state’s unemployment rate as of September 2024 is 5.3% with the prior year being 5% and the County of Santa Clara is 4.1%.

Historically, the Bay Area job growth has been led by the Peninsula for the past several years. The unemployment rate for the San Francisco Peninsula and Palo Alto is 4.2% and 3.5% respectively as of September 2024; last year it was 4% and 3.3%, respectively.

Table 3: U.S. Unemployment Rate

U.S. Bureau of Labor Statistic

The elevated inflation rate has resulted in the continued erosion of purchasing power ; however, there is still growth in U.S. consumer spending. Personal consumption expenditures (PCE) are the primary measure of consumer spending on goods and services in the U.S. economy. It accounts for about two -thirds of domestic final spending, and thus it is one of the main factors that indicates future economic growth.

Strength in PCE spending tends to prompt additional business spending. Personal spending in the United States rose by 0.5% from the previous month to an annualized rate of $20.024 trillion in September 2024, accelerating from the 0.3% increase in the previous month, and ahead of market expectations of a 0.4% increase. The result extended the period of resilience of the US consumer to higher interest rates, adding leeway for the Federal Reserve to hold rates at a restrictive level to combat inflation. The rise was owed to higher spending in goods, amid increases for durable goods and non-durable goods, consistent with the jump in spending for services.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
29 Packet Pg. 157 of 227

Table 4: Personal Consumption Spending Growth

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
30 Packet Pg. 158 of 227

ATTACHMENT C

Table 1: General Fund Base Case Revenue Assumptions

Sales Tax
Compared to FY 2019 pre-pandemic actuals of $36.5 million, sales tax revenue declined by $7.4 million, or 20.2%, during the pandemic in FY 2021. The recovery, which began in the last quarter of FY 2021, resulted in the FY 2022 and FY 2023 receipts increasing by $3.6 million or 12.3% and $4.2 million or 12.9%, respectively. The FY 2024 receipts increased by $0.6 million or 1.5%. With the economic “soft-landing”, the FY 2025 receipts is expected to be relatively flat; however, with the expected opening of a new car dealership at the end of this calendar year, a modest increase may develop compared to FY 2024 . The general retail, food products (includes restaurants ), transportation, and business to business (includes car leasing) categories experienced increases.

This economic trend was mixed in the San Francisco Bay Area and in California. A few municipalities had single digit increases in FY 202 4 while most had si ngle or double digit decreases.

The FY 2025 Adopted Budget for Sales Tax is $ 39.6 million, a $2.1 million or 5.6% increase from FY 2024 actuals of $37.5 million. Staff continues to monitor the FY 2025 sales tax trends. Revenue for FY 2026 is projected at $39.8 million, a slight $0.2 million or 0.6% increase over the FY 202 5 Adopted Budget due to many uncertainties surrounding the economy . The Base Case assumes

2.3% to 4% growth over the length of the forecast with a 10-year compound annual growth rate (CAGR) of 3.4%.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
31 Packet Pg. 159 of 227

TABLE 2: City of Palo Alto Sales Tax Revenues through FY 2035 Pr
operty Tax
Property tax revenue is the General Fund’s largest revenue source and represents approximately 25% of the total revenues. Historically, the 10 -year compound annual growth rate (CAGR) was

8.1%, with a low of 4.9% in FY 2022 and a high of 11.5% in FY 2015. During economic downturns, impacts to property tax occur a year later, as a result, the $2.8 million or 4.9% growth in FY 2022 was the lowest in the past decade. This category also includes receipts for excess Educational Revenue Augmentation Fund ( ERAF) distributions from the County of Santa Clara. ERAF is the fund used to collect and disburse property taxes that are shifted to/from cities, the County, and special districts prior to their reallocation to K -14 school agencies. When the state shifts more local property tax than required to support schools, these funds are returned and known as excess ERAF. As a result of the volatility of ERAF, it is not considered a permanent local revenue source even though it has performed strongly in the past decade.

ERAF
Reserve: Since FY 2021, the City has engaged in several disputes over the calculation and disbursement of excess ERAF Funds. In response, the City established reserves for potential estimated losses at 25% of total Excess ERAF receipts. There were favorable resolutions with the State and Santa Clara County, followed by the State and California School Board Association, for two prior disputes. The associated reserves have been released to the Budget Stabilization Reserve (BSR) or consolidated for potential future at-risk amounts.

A f
ew years ago, , the State Controller’s Office issued a negative audit finding against Marin County. The state asserts that former Redevelopment Agency funds, which are now part of the regular property taxes , should be excluded from the excess ERAF calculation. Marin County is challenging this finding and the County of Santa Clara has filed a lawsuit . The estimate is, if this audit finding is sustained, 22% of excess ERAF is at risk for fiscal years 2021, 2022, 2023, and 2024. If the finding holds, the County of Santa Clara, as well as other Excess ERAF counties, would be negatively impacted in FY 2025 and beyond. In FY 2024 , $5.6 million was set aside for the Reserve of excess ERAF for the at-risk amount. In addition, 22% or $1.5 million in FY 2025 budget Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
32 Packet Pg. 160 of 227

has been reduced by this amount. Staff will continue to monitor the status of this audit finding and report on any significant developments.

TABLE 3: City of Palo Alto Property Tax Actuals and Forecast through FY 2035

Transfer of ownership has been a significant driver of past growth; however, that growth did moderate in FY 2024 which is expected to continue i n FY 2025 due to the economic slowdown. For example, the median sales price of single family residential in the first (fiscal year) quarter of FY 2025 increased by 4% over the prior year.

The FY 2025 Adopted Budget for Property Tax is $ 68.6 million, a $2.3 million or 3.5% increase over the FY 202 4 actuals of $ 66.3 million. In FY 202 6, this revenue is anticipated to increase to $ 71.7 million, a $ 3.1 million or 4.5% increase over the FY 2025 Adopted Budget amount. The Base Case assumes 5.2% to 6.4% growth over the length of the forecast with a 10-year CAGR of 5.9%.

Transient Occupancy Tax (TOT)
Revenue in this category is impacted by business and other leisure/non -leisure travel and experienced significant reductions in FY 2020 and FY 2021 due to public health orders, travel restrictions, and diminishing business and personal travel plans resulting from the pandemic. TOT revenue declined by $20.5 million or 79.8% in FY 2021, when comparing the FY 2019 pre - pandemic actuals of $25.6 million. As public health conditions improved and travel resumed, this revenue began to recover, significantly grew in FY 2022, and i n FY 2023, currently, this revenue has recovered to pre-pandemic levels. The opening of the two Marriott hotels in mid and late FY 2021 and the re-opening of multiple hotels in FY 2021 and FY 2022 were positive developments that helped drive recovery for this tax revenue.

The FY 2025 Adopted Budget for TOT revenue is $27.9 million, a $ 0.1 million or 0.4 % increase over FY 2024 actuals of $27.8 million. In FY 2026, this revenue is anticipated to increase to $29.1 million. Year-to-date (as of August 2024), daily average room rates increased by 0.5% from $220 per day to $221 per day while occupancy rate decreased by 9.9% from 76.6% to 69.0%. Revenue Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
33 Packet Pg. 161 of 227

in this category is experiencing a near term stagnation; however, it’s anticipated to grow in FY 2026 and beyond at a projected rate of 1.3% to 5.3% over the length of the forecast, or a 4.9% 10-year CAGR.

TA
BLE 4: City of Palo Alto Transient Occupancy Tax Actuals and Forecast through FY 2035 Note: January 2015, TOT Rate went from 12% to 14%
April 2019, TOT Rate went from 14% to 15.5%
U
tility User’s Tax (UUT)
The UUT is levied on electric, gas, and water consumption, as well as on telephone usage.

Revenue in this category is impacted by consumption levels and has experienced reductions in prior periods due to water conservation programs and reduced workforces and business closures during the pandemic. This revenue has recovered as the local economy recover ed and workers returned to the office in FY 2023. In addition, higher utility commodity costs resulted in sizable utility rate increases and higher UUT revenues. The FY 2025 Adopte d Budget for UUT is $ 19.9 million, $0.9 million or 4. 7% higher than the FY 2024 actuals of $19.0 million. In FY 2026 , this revenue is anticipated to increase to $ 21.5 million, a $ 1.6 million or 7.9% increase over the FY 2025 budgeted amount . Revenue in th is category is expected to grow at 2.5% to 9.8% over the length of the forecast, or a 10-year CAGR of 4.0%.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
34 Packet Pg. 162 of 227

TABLE 5: City of Palo Alto Utility Users Tax Actuals and Forecast through FY 2035

Documentary Transfer Tax (DTT)
Revenue in this category is highly volatile and dependent on sales volume and the mix of commercial and residential sales. DTT experienced record receipts in FY 2021 and FY 2022 at $10.6 million and $12.0 million, respectively,which was followed by a sharp decline in FY 2023 at $5.8 million. In both record years, the primary drivers werelarge commercial transactions, six in FY 2021 and nine in FY 2022, and robust residential sales. In FY 2023, sales activities normalized, dropping revenue to $5.8 million, but the FY 2024 receipts were $7 million, a 10.1% increase in transactions. The FY 2025 Adopted Budget for DTT is $ 7.3 million, $0.3 million or 3.5% higher than FY 202 4 actuals. In FY 202 6, this revenue is projected to increase to $ 7.9 million, a $ 0.6 million or 9.4% increase, from the FY 2025 budgeted amount of $7.3 million.

As in past years, this revenue source is challenging to forecast and can fluctuate month to month depending on real estate transactions. The number of transactions through October 2024 (217) is 14.2% higher than October 2023, with the total revenue from these transactions increasing by

14.2%. The Palo Alto housing market remains strong, as discussed in the Property Taxes section, single family residential median sales price in Palo Alto has increased , which is an expected occurrence as the predicated econom ic soft landing and lower mortgage rate will impact property sales activity in FY 2025.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
35 Packet Pg. 163 of 227

TABLE 6: City of Palo Alto Documentary Transfer Tax Actuals and Forecast through FY 2035

Business Tax (BT)
In November 2022, voters approved Measure K (Business Tax) to provide additional funding for critical public safety needs, transportation safety improvements and grade separations, and affordable housing and unhoused services. The first BT payment was due on January 1, 2024, for calendar year 2023. As a result, the FY 2024 receipt of $5.3 million represents a year and half of collection. However, the initial collection was based on a BT rate of 3.75 cents per square foot which will increase to 7.5 per square foot starting on January 1, 2025. The tax applies to non - exempt businesses above 10,000 square feet with an annual single business cap of $500,000.

Both the rate and the cap will be increased annually by 2.5% beginning in FY 2027. A limited number of businesses have the option to offset this tax by their sales/use tax collection. After the initial first payment, filings will be submitted on a quarterly basis.

The FY 2025 Adopted Budget for BT is $4.8 million, a $0.5 million or 9.9% lower than the FY 2024 actuals of $5.3 million. In FY 2026, this revenue is anticipated to increase to $6.5 million. Revenue in this category, after an initial double -digit growth due to the rate increase, is expected to experience growth at 3% to 3.8% over the length of the forecast , with a 10-year CAGR of 5.6%.

Since this is a relatively new revenue source, staff continues to monitor collections and will make revisions if needed as part of FY 2026 budget process.

Return on Investment
The return- on-investment category reflects the interest earnings on the City’s investment portfolio. This category is a combination of past investments, new investments at current market rates, and available investable cash which fluctuates seasonally and annually. As of the timing of this LRFF, the Federal Open Market Committee (FOMC) has cut the federal funds rate twice totaling 0.75% to 4.75% (75 basis points). It is expected that further interest rates cuts will occur.

The actual FY 2024 interest earning was $3.7 million, higher than expected due an increasing interest rate environment. The average portfolio rate of return for the first quarter of FY 2025 Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
36 Packet Pg. 164 of 227

was 2.46%, and a 2.59% average yield as of the fourth quarter of FY 2024. The adopted General Fund FY 2025 budget for interest earning is $3.3 million, and is projected at $3.8 million for FY 2026, with a 4.2% CAGR over the ten-year period.

TABLE 7: Palo Alto Historical Investment Portfolio Yields and Citywide Interest Earnings R
ental Income
Rental Income of $16.4 million in FY 2026 primarily reflects rent paid to the General Fund from the City’s Enterprise Funds and tenants at the Cubberley Community Center. Rental income is projected to remain flat compared to the FY 202 5 Adopted Budget. This revenue category will be further reviewed and revised subsequent to this forecast, typically based on the December- to-December California Consumer Price Index (CCPI) in the San Francisco Bay Area.

C
harges for Services and Permits and Licenses
Revenues in the Charges for Services and the Permits and Licenses categories are anticipated to be $41.3 million and $11.6 million, respectively, in FY 2026. Together, these amounts total $52.9 million and are approximately $ 3.6 million higher than the FY 202 5 Adopted Budget of $4 9.3 million. Increases in these categories are primarily due to revenue adjustments for the agreement with Stanford to provide Fire and Dispatch services , and higher forecasts for permit and plan review services processed through the Development Center.

T
he revenue estimates in these categories are based on current activity levels, and these revenue sources are primarily driven by the cost of staff to provide services to the community. To ensure alignment with target cost recovery levels, the City has engaged a consulting firm to assist with a Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
37 Packet Pg. 165 of 227

comprehensive cost allocation plan and municipal fee study during FY 2025, with implementation anticipated in FY 2026. Staff will evaluate and bring forward recommendations to align fees with target cost recovery levels to cover general salary and benefits increases and CPI trends. These efforts aim to improve fee transparency and ensure equitable cost distribution across City services. One exception to this is Devel opment Services activities and related revenue.

Development Services fees are fully cost-recoverable, and the department has been modeled as cost-neutral in this forecast.

Charges for Service - Stanford Fire and Dispatch Services: The City and Stanford have two separate agreements for the provision of fire response and emergency dispatch services. The fire response services agreement became effective in July 2018 and outlines service level terms and a new cost allocation methodology as the baseline for agreement costs. The term extend ed through June 2023, with annual renewals in effect through June 2028 unless otherwise terminated. The agreement includes a staffing deployment model for suppression and medical services, which was approved by the City Council in October 2017 and deployed in January 2018. This forecast aligns with the new staffing model ; and, in accordance with the agreement, adjustments to revenue from Stanford have been aligned with the year -over-year changes to the operating expenses in the Fire Department over the forecast period . Similarly, changes to the revenue received for dispatching services have been aligned with the operating expenses in the Technical Services Division of the Police Department where the costs to provide these services are budgeted. For fire and police revenue, additional adjustments may be applicable if new labor agreements are negotiated for the forecast period. Revenues for these services are based on current anticipated changes in salary and benefits costs within the Fire Department and Police Department Dispatch Unit.

Charges to Other Funds
The main source of revenues in this category is General Fund administrative cost allocation plan charges to the Enterprise and Internal Service Funds. Internal support departments such as Administrative Services, Human Resources, and Council Appointed Offices provide services to Enterprise and Internal Service Funds. The costs for these services are recovered through the administrative cost allocation plan charges. The FY 2026 estimate for Charges to Other Funds of $15.1 million remains flat compared to the FY 2025 budgeted amount. To ensure alignment with target cost recovery levels, the City has engaged a consulting firm to assist with a comprehensive cost allocation plan and municipal fee study in FY 2025, with targeted implementation in FY 2026.

Staff will evaluate and bring forward cost allocation recommendations.

Operating Transfers-in
Operating Transfers -in materialize as expenses in other funds throughout the City and as a revenue in the General Fund. This budget category includes repayment of a previous loan from the General Fund to the Airport Fund, funding for police patrol in the downtown area, and the equity transfer from the Electric and Gas funds. Overall, the Operating Transfers-in are estimated to be $29.1 million for FY 2026. While this matches the total for FY 2025, the prior year included a one-time $2.0 million transfer from the General Benefits Fund. This transfer was a refund of allocated charges paid by General Fund departments into the General Benefits Fund in prior years, which had accumulated in fund balance. Additionally, the Electric Fund equity transfer Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
38 Packet Pg. 166 of 227

increased from $15.1 million to $18.3 million, while the Gas Fund equity transfer decreased from $10.9 million to $9.7 million, reflecting updated revenue forecasts for each fund.

I
n accordance with the methodology approved by the City Council in June 2009, the Electric Fund’s equity transfer to the General Fund equity transfer has been calculated by applying a rate of return on the capital asset base of the Electric Fund. This rate of return is based on PG&E ’s rate of return on equity as a pproved by the California Public Utilities Commission (CPUC). The Gas Fund’s equity transfer calculation was updated based on the passage of Measure L on the November 2022 ballot. As outlined in the ballot measure language, the Gas Fund equity transfer can be up to 18% of annual gross gas retail revenue. This LRFF increases the transfer to 18% in FY 2026, where it is projected to remain through 2035.

O
ther Revenue and Revenue from Other Agencies
Revenues in these two categories is projected at $3.6 million in FY 2026, $0.9 million lower than the FY 2025 adopte d budget of $4. 5 million. These two revenue categories mainly account for grants or reimbursements from the federal and state governments or other local jurisdictions.

Other Revenue decreased slightly by $0.2 million in FY 2026 as a result of limited time funding in FY 2025 from Lif eMoves, ,for reimbursement related to the Homekey Facility . Revenue from Other Agenc ies decreases by $0. 7 million in FY 2026 , because FY 2025 is the last year of the Staffing for Adequate Fire and Emergency Response (SAFER) grant funding awarded to the City in FY 2022.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
39 Packet Pg. 167 of 227

ATTACHMENT D
General Fund Base Case Expense Assumptions
Salary and Benefits
Consistent with prior years, the FY 2026 salaries and benefits costs represent approximately 60% of the General Fund budget expenditures. Salary and Benefits are projected to increase $ 8. 4 million or 4. 7% from the prior year, from $179 .9 million to $188 .3 million. Discussed in the following sections, this is primarily attributable to increases in salaries ($4.5 million), retiree healthcare costs ($1.9 million) and pension costs ($1.4 million).

Salary
Consistent with the City’s salary budget methodology for recent budgets, positions are budgeted at the actual rate o f pa y o f employee s i ncluding be nefit selections as o f Fal l 2024. T hen, by position, salary c o sts are upda ted in ac cordance with applicable Me m orandum o f Agreements (MOA’s) between the City and its labor groups and the Management and Professional Personnel and Council Appointees Compensation Plan(s).

In FY 2023, the City Council engaged with labor groups to negotiate new agreements for wages, benefits, and other terms and conditions of employment. These agreements extend through Janua
ry 2025 (SEIU) and June 2025 (all other labor groups) for full-time staffing and include target market adjustments to align salaries with benchmark studies, Cost of Living Adjustments (COLAs), and other benefits such as a flexible compensation benefit.

The forecast assumes step increases for employees in applicable positions, including Service Employees International Union (SEI
U), International Association of Fire Fighters ( IAFF), and Palo Alto Peace Officers’ Association (PAPOA), and merit increases for Management and Professional employees including Utilities Management & Professional Association of Palo Alto (UMPAPA) . A general wage adjustment of 2% is included for all employees starting in either January 2025 or July 2025 for all years of the forecast since no MOA’s would be in effect at that time. This is consistent with prior Council direction in previous LRFF reporting to use the 2% increase as a fo
recasting assumption, not as a commitment to future negotiations. The FY 2025 Budget includes MOA terms for a 4% C OLA adjustment (all labor groups), 2% market alignment (Safety o
nly), and increase in flexible compensation payment from $100 to $200 per month (all labor groups except SEIU).

A reserve is included for potential changes to future labor costs including changes in vacancy rates, labor and benefit rate variability, and inflation assumptions. Offering c ompetitive compensation plans aligns with industry standards for attracting and retaining a skilled and m
otivated workforce and better positions the City of Palo Alto as an employer of choice. This level of funding does not reflect a commitment to future negotiations and may differ from actual outcomes. Negotiations for new labor agreements are anticipated to occur in the next year for ne
w terms beginning in FY 2025-26. An alternative scenario is included in this report for increases be
yond the assumptions described above.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
40 Packet Pg. 168 of 227

Additionally, the budget includes vacancy savings that are expected to materialize as positions are
vacated and new employees are hired through the normal course of business. As of the timing of this LRFF, the vacancy rate is approximately 10%. Vacancy savings from public safety positions are typically exhausted by uses such as backfill, hire ahead programs, and overtime.

Consistent with changes in the previous LRFF, this forecast assumes a vacancy rate of 5% in all years. This results in additional savings of approximately $5.1 million in FY 2026 and increases to $6.5 million annually over the forecast period. Consistent with past practice, the vacancy assumption is lower than the actual vacancy rate to allow departmental use of those savings for other staffing strategies, such as filling staffing gaps by contracting for professional services, hiring ahead to allow overlap and smooth transitions, piloting new technologies to increase efficiency in the absence of staff, and supporting a summer internship program.

Benefits
Pension: Pensions a re budgeted based on CalPERS determined rates a s of the June 30, 202 3 valuation for the City’s miscellaneous and safety plans ( CM R 2405-30621). CalPERS de termines the City’s total contributions for a given Fiscal Year as the sum of two factors: Normal Cost (NC) and Unfunded Accrued Liability (UAL). Together the NC and the UAL expressed as a percentage of payroll is the ‘blended rate’ and is used to represent total costs in the discussion below.

The Normal Cost (NC) is expressed as a percentage of payroll and is paid as pa rt of the payroll reporting process of active employees. Commonly referred to as the ‘pay- go’ cost, the NC is variable and increases or decreases directly with the salary levels of the City. It represents the necessary funding for the City to pay for employees presuming that CalPERS meets the current set of assumptions.

In a
year that CalPERS does not meet assumptions, due to plan changes, assumption changes, method changes, or plan experience (incl uding investment gains/losses), there is an increase or decrease to the Unfunded Accrued Liability (UAL). Commonly referred to as the ‘catch- up’ cost, the UAL is expressed as a dollar amount and is calculated over an amortized period with defined annual pa yments, similar to a mortgage. The contributions for UAL are billed as a flat dollar amount as opposed to a percentage of payroll due to potential funding issues that could arise from a declining payroll or number of active members in the plan. However, CalPERS provides an estimated percentage of payroll for UAL to allow a consistent comparison of total costs.

The m
iscellaneous plan total costs are projected to de crease from the current 47.4% in FY 2025 to 43.7% in FY 2026 . In the safety plan, total costs are projected to de crease from the current

83.1% in FY 2025 to 81.7% in FY 2026. These rates do not consider the employee pick- up of the 1 Finance Committee, September 17, 2024; Agenda Item #1; CMR 2405-3062, https://portal.laserfiche.com/Portal/DocView.aspx?id=98648&repo=r-70 4298fc&searchid=1dfcc5e6-076e-444f- 8151-446c5257fe0f
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
41 Packet Pg. 169 of 227

employer share; that pick-up materializes as savings in the City’s pension costs. Consistent with applicable MOAs, the LRFF presumes that the miscellaneous plan will pick up 1 to 2% of the employer pension cost and that safety plan members will pick up 3 to 4%.

The
FY 2024 and FY 2025 budgets we re impacted by significant swings in investment gains and losses earned by Ca lPERS in the periods ending June 30, 2021 and 2022. The FY 2024 budget reflected significant investment returns of + 21.3% (+6.8% target) and changes to economic and demographic assumptions resulting from the CalPERS Asset Liability Management (ALM) process and Experience Study completed in November 2021. As part of the ALM, the CalPERS board approved a reduction to the discount rate (from 7.0 to 6.8%), revised actuarial assumptions (price inflation from 2.5 to 2.3%), and a new asset allocation targeting 1/3 investment in private assets, 5% leverage, and reduced public equity exposure. FY 2025 on the other hand reflect ed an investment loss of -6.1% (+6.8% target), nearly offsetting the positive impacts experienced in the prior year’s investment gains.

The
current LRFF uses an investment return of 5.8% as indicated in the June, 30, 2023 valuation report. Since the issuance of the current valuation, CalPERS announced a preliminary investment return of + 9.3% (+6.8% target) for the period ending June 30, 2024 2 which has been recently revised to 9.5%. These results will be included in the CalPERS valuation report issued in Fall 2025 to inform the development of the 2027-2036 LRFF and FY 2027 budget. The resulting liability from investment returns that did not meet target levels will be amortized over 20 years with a 5- year ramp -up period. To inform this LRFF, staff used the CalPERS Pension Outlook Tool to calculate the estimated impacts, resulting in additional costs of $ 0.2 million ($0.1 million in the General Fund) in FY 2026, and increasing to $1.2 million ($0.5 million in the General Fund) at the peak of the 5-year ramp in FY 2030.

In the
General Fund, it is anticipated the City will spend a total of $ 51.1 million on total pension costs in FY 2026 , including both CalPERS contributions and supplemental Pension Trust Fund contributions. This is approximately $1.4 million higher than the prior year costs of $49.7 million, or a 2.9% increase. These expenses represent approximately 1 6% of the General Fund’s total expenses.

TABLE 1: CalPERS’ Projected FY 2025-2035 Blended Retirement Rates (percentage of payroll)
FY
2025
FY
2026
FY
2027
FY
2028
FY
2029
FY
2030
FY
2031
FY
2032
FY
2033
FY
2034
FY
2035
Miscellaneous 47.4 43.7 40.6 41.0 43.1 42.7 42.2 38.7 37.2 34.5 32.7 Safety 83.1 81.7 82.8 83.3 86.3 85.4 84.4 80.2 77.6 72.3 69.7 2 CalPERS Reports Preliminary 9.3% Investment Return for 2023-24 Fiscal Year:
https://news.calpers.ca.gov/calpers-rep orts-preliminary-9-3-investment-return-for-2023-24-fiscal- year/#:~:text=CalPERS%20today%20reported%20a%20preliminary,were%20valued%20at%20%24502.9%20billion.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
42 Packet Pg. 170 of 227

Retiree Healthcare/Other Post-Employment Benefits (OPEB): Retiree Medical is based on the June 30, 2023 actuarial study prepared by Foster & Foster (previously Bartel Associates ), which is completed every two years. The most recent study was completed in J une 2024 to inform the development of the FY 2026 and FY 2027 operating budgets (CMR 2406-31403). Consistent with City Council direction and the Retiree Benefit Funding Policy, this forecast continues the practice to budget the full payment of the Actuarial Determined Contribution (ADC) for retiree healthcare and uses alternative assumptions, such as a more conservative 5.75% discount rate (6.25% assumption), to transmit amounts above the recommended payment as an additional discretionary payment (“prefunding”) to the California Employers’ Retiree Benefit Trust (CERBT) Fund.

CalP
ERS blends active employees with pre -Medicare retirees and charges the same medical premium, even though younger employees on average consume less healthcare. The higher premium t o younger employees thereby subsidizes older employees and retirees who, on average, have higher claims and premiums. The LRFF estimates $12.4 million in the General Fund in FY 2026 for ADC, an approximate $1.9 million or 18.4% increase from FY 2025 levels of $10.5 million in the General Fund. The implied subsidy is $2.9 million in FY 2026 and effectively lowers the funding necessary to meet the ADC.

TAB
LE 2: Retiree Medical General Fund Contributions
FY
2025
FY
2026
FY
2027
FY
2028
FY
2029
FY
2030
FY
2031
FY
2032
FY
2033
FY
2034
FY
2035
$10.5 $12.4 $12.8 $13.2 $13.6 $14.0 $14.5 $14.9 $15.4 $15.8 $16.3 Re
tiree Benefit Funding Policy (formerly “Pension Funding Policy”): The City has taken several proactive steps to address rising pension costs and long-term liabilities, including cost-sharing in labor agreements, establishing an irrevocable Section 115 Pension Trust (“Pension Trust”) and California Employers ’ Retiree Bene fit Trust (CERBT) Fund, and adopting a policy that guides financial planning of these benefits (CMR 11722 as modified by 2212-0513 4).

The
City initially contributed to the Pension Trust in FY 2017 on an ad- hoc basis, using one-time savings or excess rev enues. Beginning in FY 2019, the City Council directed staff to use a more conservative discount rate as compared to CalPERS for the Normal Cost (NC) portion of the payment and transferring the supplemental funding beyond CalPERS required employer contributions to the Pension Trust. This practice was reinforced with Council approval of the Retiree Benefit Funding Policy, and as of FY 2024 the City’s NC discount rate is 5.3% as compared to CalPERS 6.8%. Additionally, one -time contributions continue to be made each year if excess 3 City Council, June 17, 2024; Agenda Item #28; CMR 2406-3140 (Attachment D), https://portal.laserfiche.com/Portal/DocView.aspx?id=73983&repo=r-70 4298fc&searchid=2c9494ad-bd72-4ebd- b0f6-9b22ab7c6ca5
4 City Council, November 30, 2020; Agenda Item #7; CMR 11722, https://portal.laserfiche.com/Portal/DocView.aspx?id=105077&repo=r-704298fc Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
43 Packet Pg. 171 of 227

revenues or unspent savings are available, subject to City Council approval. As part of policy goals, the City seeks to reach a 90% funded status by FY 2036.

Ever
y four years, the City’s Retiree Benefit Funding P olicy requires that staff consult with an actuary to inform the City Council of progress the City has made towards achieving a 90% funded status goal and assess and respond to changes impacting the City’s retiree benefit plans. This comprehensive review was most recently completed in FY 2023 and resulted in several policy revisions, most notably reducing the discount rate used to calculate supplemental contributions to the Pension Trust from 6.2% to 5.3% and extending actuary reporting from 3 to 4 years to align with the CalPERS ALM Study. Additionally, the title of the policy was revised from the Pension Policy to the Retiree Benefit Policy to recognize actions approved by the City Council to proactively plan for retiree healthcare plans in a similar manner to pensions, including the use of a lower 5.75% discount rate (CMR 2212-05135). The most recent actuary analysis projects that the City will meet a 90% funded goal for pension plans by FY 2034 ( miscellaneous plan) and FY 2036-37 (safety plan); the City’s practice of transmitting excess one -time savings will help reach these goals sooner.

In thi
s forecast, approximately $8.5 million in the General Fund in supplemental contributions to the City’s Pension Trust is assumed in FY 202 6. Through FY 2025, a total of $ 87.4 million ($56.4 million in the General Fund) in principal contributions are expected to be made to the Pension Trust for pension benefits. Through FY 202 5, it is expe cted that $ 14.7 million in principal contributions will be made to the CERBT Fund for retiree healthcare benefits.

He
althcare: Consistent with the most recent labor agreements between the City and its bargaining units, the City’s contribution amounts towards medical costs for employees are based on a flat rate contribution from the City, with the employee contributing towards the remaining medical plan premium. Like salaries, healthcare costs are updated in accordance with applicable Memorandum of Agreements (MOA) between the City and its labor groups and the Management and Professional Personnel and Council Appointees Compensation Plan(s).

Wo
rkers’ Compensation: The budget appropriation for workers' compensation includes an estimate for claims incurred and reserves for current filings at an 85% confidence level, based on actuarial studies completed by Bickmore. Actuarial estimates completed in August 202 3 informed FY 2025 budget levels of $ 7.6 million (approximately 72% in the General Fund). Mo re recent actuary estimates completed in August 2024 project expense levels to increase, but the allocation between the General Fund and other funds to remain consistent. Staff will continue to monitor expenditures in the fund and bring forward adjustments as necessary. Claim estimates and reserves for FY 2026 are $9.0 million, representing a $1.4 million or 18.4% increase from the FY 2025 Adopted Budget. Estimates for workers' compensation increase in the forecast at rates consistent with general CPI increases.
5 City Council, February 6,2023; Agenda Item #3; CMR 2212-0513, https://portal.laserfiche.com/Portal/DocView.aspx?id=61647&repo=r-70 4298fc&searchid=d3b87446-2f24-46e1- a412-fa0ae4a0ee58
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
44 Packet Pg. 172 of 227

Contract Services
This forecast assumes contract services of $ 34.6 million in FY 2026, a 3.1% increase from the FY 2025 Adopted budget of $ 33.5 million. This in crease for FY 2026 is driven primarily by known contractual increases and a general 3% CPI cost increase on contracts that do not have defined annual increases, based on a review of the changes in the California Consumer Price Index (CCPI) in the San Francisco Bay Area from the August-to-August period. It is expected that the estimated CPI increases will be substituted with department base budget requests to adjust contract funding needs as part of the FY 2026 budget process.

Contract Services - Committed Additions
The Committed Additions included in this forecast account for anticipated operating and maintenance (O&M) costs in the General Fund for capital projects anticipated to come online within the ten- year forecast period. Costs for projects that came online in FY 202 5 have been annualized into the ongoing General Fund operating budget as part of the LRFF. The preliminary total estimate is $50,800 for costs associated with the following projects anticipated to come online in FY 2026: Dog Park Installation (PG-18001), Fire Station 4 (PE-18004), Library Automated Materials Handling (LB- 21000), and Park Restroom Installation (PG -19000). Additional cost increases of 3.0% annually are included throughout the ten- year forecast based on a review of the changes in the California Consumer Price Index (CCPI) in the San Francisco Bay Area from the August-to-August period. Timing and analysis of the funding needs for these projects will be evaluated as part of the FY 2026 Budget process a nd development of the 2026-2030 Capital Improvement Plan (CIP).

TABLE 3: FY 2026 – FY 2035 Committed Additions (Millions) FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 $0.05 $0.05 $0.07 $0.11 $0.12 $0.12 $0.14 $0.14 $0.16 $0.16 Supplies and Materials
The FY 202 5 Adopted Budget for the General Fund included $3. 5 million for Supplies and Materials, which is anticipated to increase by a 3 .0% CPI cost increase in FY 2026 to $3.6 million based on a review of the changes in the California Consumer Price Index (CCPI) in the San Francisco Bay Area from the August -to-August period . This annual increase is adjusted to 4% starting FY 2028 through the ten- year forecast period. It is expected that the estimated CPI increases will be substituted with department base budget requests to adjust funding for supplies and materials as part of the FY 2026 budget process.

General Expense
This category includes costs for travel and meetings, telephone and non-city utilities, contingency accounts and reserves, bank card service charges, and subsidies and grants provided through the Human Services Resource Allocation Program (HSRAP). The FY 202 5 Adopted Budget of $ 22.1 million is expected to decrease to $ 18.2 million in FY 202 6, primarily reflecting a planned year over year reduction in appropriations for Green Case settlement payouts and the anticipated use Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
45 Packet Pg. 173 of 227

of the Budget Uncertainty Reserve to balance the FY 2026 budget. This reserve was partially used to balance the FY 202 5 Adopted Budget ($6.1 million), leaving approximately $ 6.1 million to partially fund the anticipated gap in FY 2026 ($12.0 million). The reduction is partially offset by a

3.0% annual CPI cost increase on smaller items that do not have a set annual budget, based on a review of the changes in the California Consumer Price Index (CCPI) in the San Francisco Bay Area from the August-to- August period. It is expected that the estimated CPI increases will be substituted with department base budget requests to adjust funding for general expense items as part of the FY 2026 budget process.

Ge
neral Expense – Project Homekey: On September 27, 2021 the City Council directed staff to apply for Project Homekey funding in conjunction with LifeMoves to build an emergency shelter at the former Los Altos Treatment Plant (LATP) site (CMR 13595 6). This project will deploy modular housing to provide interim housing opportunities for homeless individuals and families in the City of Palo Alto. Project Homekey is a prog ram, funded by the State of California Department of Housing and Community Development, intended to provide grant funding and facilitate a partnership with the State to quickly acquire, rehabilitate, or master lease a variety of housing types. Once developed, these projects provide interim or permanent housing options for persons experiencing homelessness. The site will be operated for at least fifteen years as interim housing per the program’s durational requirement. This project w ill utilize a combination of funding sources including the Project Homekey Program for capital expenses and donations, grant funds, and City support for ongoing operations expenses. This LRFF includes the City’s committed investment of $7.0 million in operating expenses ($1.0 million annually FY 202 5 through FY 2031). Some operating funding support is expected from Project Homekey as well as the County of Santa Clara. Any remaining gaps in funding will need to be closed by fundraising, operating cost containment strategies, and/or grant funds.

Ge
neral Expense - Cubberley Lease: Recently, a tentative agreement between the City and PAUSD has been developed that will amend the City’s leased portion of the Cubberley site. Although this agreement still needs to be approved by the City Council, this report assumes a reduction to the annual lease costs for Cubberley to $2.0 million plus the ongoing $0.8 million for child daycare sites and utilities. As part of the original lease agreement, the City Council approved creation of the Cubberley Infrastructure Improvements Fund supported by an annual $1.9 million transfer from the General Fund, which is classified as an Operating Transfer-Out and discussed in further detail in that section of this report below.

Rents and Leases
The Rents and Leases expense category for FY 202 6 is estimated to increase from the FY 202 5 Adopted Budget level by approximately 2.7% to $1.4 5 million. This is based on current lease terms that include previously negotiated lease increases This category includes the lease agreement for Development Services staff at locations outside City Hall (285 Hamilton and 526 6 City Council, September 27,2021; Agenda Item #10; CMR 13595:
https://www.cityofpaloalto.org/files/assets/public/agendas-min utes-reports/agendas-minutes/city-council- agendas-minutes/2021/09-september/20210927/210927accsm-amended-final.pdf Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
46 Packet Pg. 174 of 227

Bryant) as well as lease with Stanford for El Camino Park. A new lease agreement was executed in December 2020 for the Development Services office location at 526 Bryant Street, limiting the space to the basement level (CMR 11426
7). The lease was amended in September 2022 to extend
the term initially for 12 months with the right to automatically extend for four successive 12 - month periods, potentially through January 31, 2028 (CMR 14713). In June 2021, the City entered into a seventh amendment for the Development Services office lease at 285 Hamilton Avenue to extend the term from February 2022 to January 2025 ( CMR 12334 8). As expenses for rent for
Development Services are adjusted, a corresponding revenue adjustment will be made to ensure Development Services maintains cost recovery levels.

Facilities and Equipment
Along with funding for various equipment needs across departments, this budget category includes subscription payments for equipment like public safety radios. The Facilities and Equipment expense category is expected to decrease from the FY 2025 Adopted level of $656,000 to $536,000 due to the elimination of one-time funding to replace fire equipment budgeted in FY 2025. It is expected that the estimated CPI increases will be substituted with department base budget requests to adjust funding for equipment needs as part of the FY 2026 budget process.

Allocated Charges
Allocated Charges represent expense allocations by the City’s Enterprise and Internal Service Funds for services and products they provide to other departments. The FY 2025 Adopted Budget for the General Fund included $26.9 million for these expenses, including utilities usage, general liability insurance, technology costs, vehicle equipment maintenance and replacement costs, and other charges for services provided by other City departments and funds. The FY 2026 allocated charges in the LRFF update the revenues and expenses for these various allocations based on the information available at the time of the LRFF development. FY 2025 is anticipated to experience an increase of 14.0% to a total of $30.7 million. This increase is primarily due to anticipated higher costs associated with technology services and utilities for City facilities such as water, electricity, and gas.

Operating Transfers Out
Operating Transfers Out include transfers from the General Fund to Debt Service Funds, the Technology Fund, and various other funds but excludes transfers to the Capital Improvement Fund, which are detailed in the following Transfer to Infrastructure section. The FY 2025 Adopted Budget included Operating Transfers Out of $6.3 million. In FY 2026, Operating Transfers Out are anticipated to increase to $6.4 million due to increases in the technology surchar ge transferred to the Technology Fund to cover the General Fund’s portion of new technology costs. Consistent with the FY 2025 Adopted Budget, a total of $2.0 million across the University Avenue, California 7 City Council, December 14, 2020; Agenda Item #5; CMR 11426, https://www.cityofpaloalto.org/files/assets/public/agendas-min utes-reports/reports/city-manager-reports- cmrs/year-archive/2020-2/id-11426.pdf?t=59979.32
8 City Council, June 21, 2021; Agenda Item #15; CMR 12334, https://www.cityofpaloalto.org/files/assets/public/agendas-min utes-reports/reports/city-manager-reports- cmrs/2021/id-12334.pdf
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
47 Packet Pg. 175 of 227

Avenue, and Residential Permit Parking Funds is factored into this LRFF . S taff will continue evaluating these funds as part of the FY 202 6 budget development and will bring forward recommendations as needed to keep the parking permit funds solvent.

Transfer to Infrastructure
Recovery from the COVID -19 pandemic is reflected in improved revenue levels in the FY 202 5 budget compared to the FY 2024 budget. The total General Fund transfer to the Capital Improvement Fund budgeted in FY 2025 is $ 30.2 million compared to the $ 24.7 million transferred in FY 2024. This is comprised of a $14.5 million base transfer, interest earnings of $2.0 million, and $ 13.7 million from TOT revenue generated through voter -approved rate increases and new hotels that is dedicated to the Capital Improvement Fund to support the 2014 Council Infrastructure Plan, consistent with City Council direction. Estimated transfers from TOT revenues in FY 2026 are currently projected to increase to $14.2 million and the base transfer to increase to $17.2 million, along with estimated interest earnings of $2.0 million, for a total $33.4 million transfer to the Capital Improvement Fund. This forecast continues the goal established as part of the 2022-2026 Capital Improvement Plan (CIP) to restore the base portion of this transfer to pre- pandemic levels by FY 2026. This budget category also includes the separate $1.9 million transfer to the Cubberley Property Infrastructure Fund. This transfer to the Cubberley Property Infrastructure Fund supports facilit y systems maintenance needs a t the Cubberley Community Center facility as well as capital improvement projects to maintain and upkeep the facility.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
48 Packet Pg. 176 of 227

ATTACHMENT E
Assumptions Not Included in Forecast
It should be noted that this forecast does not include several potential impacts to the FY 2026 - 2035 LRFF that are outlined below. These items are known projects or areas of investment that are priorities but have not been fully developed in terms of costs and timelines. This is not intended to be a comprehensive list nor in any priority order.

Project Homekey: H
omekey Palo Alto is a modular interim housing shelter for unhoused individuals and families codeveloped by the City of Palo Alto and LifeMoves. This LRFF includes the City’s committed investment of $7.0 million in operating expenses ($1.0 million annually for seven years) to fund Homekey Palo Alto. The City’s costs for this project could fluctuate throughout the ten-year period, but some of those costs could be funded by business tax revenue for affordable housing and homeless services that has not been fully all ocated. Upon the completion of the 7 years, ongoing funding remains to be determined.

Hou
sing Growth Impacts : On August 20, 2024, the City’s FY 2023 -31 Housing Element 1 was certified, outlining the condition of the City’s current housing and future needs of its residents through citywide housing goals, objectives, and policies. The City is required to ensure adequate planning for its “fair share” of affordable and marke t rate housing, and must demonstrate a strategy for removing barriers to increase housing production and counter well- documented housing shortage. The City’s housing target for the eight-year planning period (January 31, 2023 to January 31, 2031) is defined by its RHNA allocation which assigns an additional 6,086 total units into four income categories. The financial implications of this housing growth would increase costs for land acquisition, planning and design, and construction, with offset by new revenues such as sales tax and other economic benefits derived from more affordable housing.

The Housing Element
2 and the associated Environmental Impact Report (EIR) 3 provide more detail; however, such financial impacts, especially to the General Fund, have yet to be determined and incorporated into the LRFF.

Geng Road Safe Parking Program: T
he Geng Road program began in early 2021 as a place for households dwelling in their vehicles to park their vehicles in a designated off-street parking lot.

The City launched the program in partnership with Santa Clara County to offer recreational vehicle (RV) dwellers a safe place to park, case management, and assistance with finding permanent homes. On August 19, 2024, City Council approved the site expansion at 2000 Geng

1 City of Palo Alto FY 2023-31 Housing Element, https://paloaltohousingelement.com/wp- content/uploads/2024/08/Palo-Alto-Housing-Element.pdf
2 City of Palo Alto FY 2023-31 Housing Element, https://paloaltohousingelement.com/wp- content/uploads/2024/08/Palo-Alto-Housing-Element.pdf
3 Addendum to the 2030 Comprehensive Plan Environmental Impact Report, https://files.ceqanet.opr.ca.gov/80033-5/ attachment/XqcKmj04NCYoJsEb- _sTj8ondOwUj0KbDwiMk56gQ1DCexjgecgNZzQ5LYmJyKBi2EBHmZ65ks5lb4s00 Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
49 Packet Pg. 177 of 227

Road to increase the number of safe parking spaces by 10 (CMR 2407-32744). Staff is working to secure funding for this expansion through the California Department of Housing and Community Development’s (HCD) Permanent Local Housing Allocation Program (PLHA). Even if granted, PLHA funding is not expected to fully fund the expansion, and any balance of the costs may be funded by business tax revenue for affordable housing and homeless services that has not yet been fully allocated, or other sources as may be identified during the budget process.

S
ustainability and Climate Action Plan (S/CAP): In early 2020, the City launched an update of the Sustainability and Climate Action Plan (S/CAP) Framework to determine the goals and key actions needed to meet its sustainability goals, including the goal of reducing greenhouse gas (GHG) emissions to 80 percent below 1990 level s by 2030 (the “80x30” goal). Investments have been made across various City funds related to S/CAP including: a new Grid Modernization for Electrification capital project (EL -24000), realignment of staff to manage infrastructure improvement projects; scaling existing successful energy efficiency programs; performing and analyzing research in alternative energy sources, sustainable water supplies, carbon sequestration options; and increasing incentives for voluntary electrification programs. The S/CAP Thre e-Year Work Plan for 2023 –2025, approved by Council in Spring 2023, provided a roadmap for these efforts, and the City has accounted for known capital projects and programmatic needs in its forecasts. However, there are uncertainties related to external factors that could impact the scope and scale of work needed to achieve the City’s long -term sustainability goals. These unknowns are not fully reflected in this forecast.

S
ignificant Code and O rdinance Updates: Updates to several significant programs, codes and ordinances are expected to be necessary in the near future. Some of these updates include:

Seismic Inventory Ordinance and Program Development, Historic Building Survey and Ordinance Development, Zoning Code Updates, and the development of the 2040 Comprehensive Plan, the successor plan to the 2030 Comprehensive Plan . While some costs associated with zoning code updates and the preparation of the 2040 Comprehensive Pl an were included in the forecast, additional resources may be required depending on future Council direction and the extent and pace of implementation efforts.

F
ee and Organizational Studies: The Planning and Development Services (PDS) Department is in the process of finalizing a fee study which is tentatively scheduled for Finance Committee in February 2025. At the same time, the City is conducting a Citywide Municipal Fee Study and Cost Allocation Plan, with plans to implement its recommendations in FY 2026. Periodically completing fee studies with an outside consultant is a best practice to ensure the City’s fees align with its cost recovery policies. Recently the Park, Community Center, and Library Development Impact Fees for residential development were converted from a per dwelling unit basis to a per square foot basis, aligning with AB 602 requirements for a more equitable distribution of fees based on 4 City Council, August 19, 2024; Agenda Item #10; Staff Report #2407-3274, https://portal.laserfiche.com/Portal/DocView.aspx?id=88920&repo=r -704298f c&searchid=1196faea-adb3-49fd- 9006-dfb863754685
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
50 Packet Pg. 178 of 227

development size. Additional impact fee modifications are anticipated, with a staff report providing further details expected in Spring.

Labor Ne gotiations: As of the timing of this report, all labor agreements for full -time employees are scheduled to expire by June 2025 except for the Service Employees International Union (SEIU) agreement, which expires January 2025. Consistent with Council direction in previous LRFF’s, a general 2% assumption is included for all employees starting in either January or July 2025 for all years of the forecast since no MOA’s would be in effect at that time; this is not as a commitment to future negotiations and is for forecasting purposes. Additionally, this forecast includes a level of reserve for potential changes in employee compensation in future agreements for competitive wages and other terms of employment. Actual funding needs may differ, depending on outcomes of future labor negotiations. Additional information on salary and benefit assumptions and reserves for future agreements is included in Attachment D.

Grade Separation: T
he grade separation project consists of four at- grade crossings along the Caltrain corridor in the City of Palo Alto located at Palo Alto Avenue, Churchill Avenue, Meadow Drive, and Charleston Road. As part of the FY 2024 Capital budget, the Council approved two capital projects to separate them , specifying the funding sources and costs associated with Churchill Avenue (PL-24001) and Meadow Drive and Charleston Road (PL-24000) which are being designed together. The Palo Alto Avenue project is currently on hold. In June 2024, City Council authorized staff to advance the project into Preliminary Engineering and Environmental Documentation (PE&ED) Phase (CMR 2404 -2861
5) for the three crossings at Churchill Avenue
Meadow drive, and Charleston Road. The phase will lead to the development of 35% plans, renderings, and cost estimates as well as completion of CEQA and NEPA documentation to obtain necessary environmental clearances.

Currently, staff is working on developing a three-party cooperative agreement between the City, Valley Transportation Authority (VTA) and the Peninsula Corridor Joints Power Board (PCJPB) or also known as Caltrain to allocate $14.0 million from Santa Clara County 2016 Measure B Caltrain Grade Separation funding toward PE&ED phase. The 2016 Measure B program tax revenue amounts to a total of $700 million in 2017 dollars for all at-grade crossings in Santa Clara County, and the City anticipates an allocation of 50% of this funding. The VTA is currently programming these funds in two -year increments. As Grade Separation 2016 Measure B funding requires matching local funds as a result, additional funding sources will need to be identified to perform this work in upcoming years (FY 2025-FY 2033). Additional resources will need to be explored to plan and fund these grade separations, including City staff pursuing additional funding through grant opportunities as they become available and other financing mechanisms.

5 City Council, June 17, 2024; Staff Report #2404-2861, https://portal.laserfiche.com/Portal/DocView.aspx?id=73967&repo=r -7042 98fc&searchid=948efea6-f77f-4463- a371-dabd04cd097d
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
51 Packet Pg. 179 of 227

Parks Master Plan: The Parks, Trails, Natural Open Space and Recreation Master Plan 6 was adopted in 2017; and presents a long-term vision for the system. Potential funding mechanisms have been identified for several high-priority projects and programs, however, a strategy to fund implementation of the entire plan has not been completed. As such, this forecast does not yet contemplate the necessary investments to fully execute this plan.

City-o
wned Assets Operated by N on-profit Organizations: This Forecast does not include any additional capital or operating investments for the Avenidas Senior Center, the Ventura Childcare Center, nor the Sea Scout Building. As costs around potential capital or operating investments for these assets solidify, staff will return to City Council to address them as appropriate. The Roth Building Rehabilitation Phase 1 capital project (PF-23001) is proceeding under a funding strategy outlined in the Tenant Work Letter and included in the LRFF; however, if costs for rehabilitating the facility further increase, additional sources of funding would need to be identified.

Additionally, the City’s newly approved community center at 445 Bryant Street will operate with part-time use by La Comida for a senior nutrition program, alongside potential programming and shared uses coordinated by the Community Services Department. While La Comida’s rental terms are being defined, future revenue opportunities from shared programming or facility rentals remain uncertain.

Cubberley Community Center Redevelopment: O
n October 7, 2024, the City Council (CMR 2409 -
35007) approved the MOU with PAUSD for Cubberley Site purchase and lease. The LRFF includes the revised lease financial terms and maintains the Real Estate Investment Reserve of $1 million annually which will fund the critical professional service contracts (i.e. master plan, community outreach, polling, etc.) in the next 24 months, and also serve as a placeholder for future real estate investment appropriations. However, the LRFF does not reflect any General Obligation bond cashflow as that is yet to be determined and hopefully will have an insignificant net impact on the General Fund. The LRFF does not factor in other costs such as future Cubberley operating costs and/or repairs, as these fiscal impacts will be informed in the upcoming 24 months with the development of the proposed operational and financial models.

Loans for S pe
cial Projects: From time to time the City’s General Fund will assist other City operations with modest cash flow loans to bridge fiscal years. For example, the City provided over $3 million in loans to the Airport Fund as it worked to secure significant grant funding from the Federal Aviation Administration (FAA) for capital improvement costs. As of FY 2020, the Airport Fund began paying back the loan to the General Fund. Additions and other initiatives funded in other funds may need financial support from the General Fund to ensure they are fully implemented. In FY 2023 the Residential Preferential Parking (RPP) Fund received a $0.4 million General Fund loan to remain solvent while continuing operations, given the sustained drop in parking demand during the pandemic. A s imilar loan for $50,000 to the Residential Preferential

6The Parks, Trails, Natural Open Space and Recreation Master Plan, 2017; https://www.cityofpaloalto.org/files/assets/public/public-works/palo-alto-parks-master-plan.pdf 7 City Council, October 7, 2024; Agenda Item #AA1; Staff Report #2409-3500, https://portal.laserfiche.com/Portal/DocView.aspx?id=98620&repo=r -7042 98fc&searchid=d8e93928-24cc-47b6- b45b-978951b272c4
Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
52 Packet Pg. 180 of 227

Parking (RPP) Fund and $450,000 to the California Avenue Parking Fund were approved as part of the FY 2024 budget. As parking continues to be impacted by effects from the Covid- 19 pandemic and remote/hybrid work, additional loans from the General Fund of $2.0 million annually to the parking funds are assumed in this forecast. This LRFF also assumes repayment revenue to the General Fund from previous parking loans including $0.4 million (RPP) in FY 2033, $500,000 (RPP and California Avenue Parking Fund) in FY 2034, and $2.0 million (RPP, California Avenue Parking Fund, and University Avenue Parking Fund) in FY 2035. Staff will continue to review costs in the parking funds and revise funding needs and evaluate support as a loan or subsidy from the General Fund as part of the development of the FY 2026 budget.

Legislative Updates: V
arious actions at the state and federal level that could impact the City of Palo Alto have not been incorporated into this forecast due to the changing context and uncertainty of the quantitative impacts of potential legislative changes. As the potential impacts of various legislative initiatives are clarified, appropriate adjustments will be identified and brought forward as part of future budget development cycles.

Aging or Noncompliant Infrastructure: The City maintains indoor and outdoor facilities, many of which have been identified in the City’s ADA transition plan and by the Infrastructure Blue Ribbon Commission as requiring capital project work to bring them up to full ADA compliance and/or sufficient conditions. Facilities of concern include Cubberley Community Center, Foothills Park Restrooms, and Lucie Stern Community Theatre restrooms. Staff continues the program work needed in this area as part of the Americans with Disabilities Act Compliance capital project (PF- 93009); however, the entire scope of work needed in this area exceeds current resources.

General Liability Umbrella Excess Premiums: T
he City’s General Liability Program provides funding
to cover various insurance policies for City -owned equipment and machinery. The City is self - insured for the first $1.0 million in losses per occurrence and participates in a Joint Powers Authority for coverage up to $55 million per occurrence. These expenses are allocated to citywide departments. General Liability Umbrella Excess Premiums are anticipated to increase in future years due to significant national events and natural disasters such as claim costs for Hurricane Ian. Staff will bring forward adjustments for these costs as part of future budget cycles as they become available.

Fire and A
mbulance Service Expansion: On November 19, 2024, the Finance Committee reviewed and discussed fire and ambulance service expansion options (CMR 2406 -3310). Staff continues to analyze these services, and any funding, appropriation and labor negotiation will be guided by future City Council direction, and as such not incorporated into the LRFF at this time.

Fire Training Center: A
s part of the FY 2023 Adopted Capital Budget the City Council approved the Fire Training Facility Replacement capital project (FD -24000) to identify an appropriate site and construct a new fire training facility in Palo Alto. Funding was only appropriate d for the feasibility study portion of the project in FY 2024, and additional resources will need to be appropriated in future budget cycles based on the results of the study. In addition, the Fire Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
53 Packet Pg. 181 of 227

Department is also evaluating opportunities to partner with other local jurisdictions for training needs, instead of building a permanent facility in Palo Alto. Staff from Public Works and Fire Departments are working on a scope of work to study the facility needs and potential locations for the center and plan on engaging a consultant in early 2025.

Limited Term Programs: T
here are several programs currently in progress that are funded on a limited term basis per Council approval. If these programs are recommended to continue through the ten-year forecast period additional resources would be needed. • The Psychiatric Emergency Response Team (PERT) program in the Police Department pairs a police officer in plain clothes and a mental health clinician to respond to calls for mental health emergencies. In FY 2024, PERT funds were unspent due to the inability to source and supply a clinician. The funds were returned to the Stanford University Medical Center (SUMC) Fund and recommended to be used in the future to support the PERT program when the County can provide a clinician. The PERT program is recommended to be supported with SUMC funding through FY 2028.

• PA Link, the on-demand transit service, is continuing its pilot program with grant funding from the Transportation Fund for Clean Air (TFCA) and contributions from the Stanford Research Project (SRP) in conjunction with CIty funding in FY 2025. Staff is looking for new funding sources including grant funding and potential strategic partnerships with companies. With the continuation of the SRP cost sharing agreement and current fare structure in FY 2026, it is estimated that an additional $0.4 million in funding is required to fully fund the program in FY 2026.

Vehicle Fleet Electrification:

Currently the City’s policy is to consider electric vehicles and then other alternative fuel vehicles when replacing existing vehicles. Transitioning the vehicle fleet to full Electric Vehicles (EVs) is part of the City’s sustainability goals. It has been estimated that at least $6.0 million across all funds will be needed annually ($2.4 million above the FY 2025 budget) in order to replace all City vehicles with EVs.

Green Storm Infrastructure (GSI) Maintenance : The City is subject to the requirements of the Municipal Regional Stormwater National Pollutant Discharge Elimination System Permit in the San Francisco Bay Area (Order R2-2015-0049,) also known as the Municipal Regional Permit (MRP). The MRP applies to 79 municipalities and flood control agencies that discharge stormwater into the San Francisco Bay. MRP Provision C.3 requires “Regulated Projects,” defined as new development and redevelopment projects that exceed certain impervious surface size thresholds, to mitigate stormwater quality impacts by incorporating site design, pollution control measures, and stormwater treatment measures --typically known as green stormwater infrastructure (GSI). Section C.3.j.ii.(2) also requires that the City, by June 30, 2027, construct GSI that treats 3.92 acres of impervious surface (based on a required ratio of 3 acres/50,000 residents). Moreover, the City is required to integrate GSI into Capital Improvement Program projects wh en possible. Consequently, the City expects to have significantly more GSI and associated maintenance in the coming years, the cost of which is still being quantified.

Attachment I
Item 12
Attachment I - FY 2026-
2035 Long Range
Financial Forecast (LRFF),
CMR 2405-3068

Item 12: Staff Report
Pg.
54 Packet Pg. 182 of 227

DECEMBER 3, 2024 www.cityofpaloalto.org
FY 2026 – FY 2035

LONG RANGE

FINANCIAL FORECAST
Finance Committee Item #2
Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
55 Packet Pg. 183 of 227

2 OVERVIEW
• Forecast the economy remains weak in 2025, returning to growth tre
nd in 2026
o Stagnation, uncertainty and potential volatility at Fe deral level • Expense projections based on current approved service levels o Maintain funding for long-te rm liabilities and 18.5% BSR • LRFF is fairly consistent with FY 2025 Adopted Budget o M
ulti-year budget balancing s trategy
o One-time funding continues to be used for near-t erm fiscal s
tability
o Continued strategic pla nning and fiscal discipline
Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
56 Packet Pg. 184 of 227

3 Fiscal Year 2026 - 2035 Base Case Forecast
• FY 2026 projected shortfall of $12.0 million, previously anticipated at $11.0 million • Uncertainty Reserve of a recommended $12M offsets projected FY 2026 shortfall • Annual Shortfall in FY 2027-2029 range from $7.9M to 5.6M • Budgeted revenues projected to support expenditures starting in FY 2030 Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
57 Packet Pg. 185 of 227

4 MAJOR TAX REVENUE PROJECTIONS
Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
58 Packet Pg. 186 of 227

3 BSR and Recommended FY24 Surplus Allocation
5 POLICY & STRATEGY:
• Maintaining FY 2025 BSR at

18.5%
target level
• Multi-year strategy to balance
an
ticipated shortfalls
RECOMMENDATION:
• $3.0M to Infrastructure
Re
serve and $5.9M to Budget
Uncertainty Reserve
APPROPRIATION ACTION:
• FY 2025 Mid-Ye ar Review
(February 2025)
Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
59 Packet Pg. 187 of 227

6 ALT SCENARIO A: ECONOMICALLY SENSITIVE REVENUE IN FY26 • Models the impact of a 1% loss in economically sensitive revenue categories starting in FY 2026 • Major Taxes, Charges for Services, and Permits and Licenses • Revenues decrease by $2.3M in FY 2026 and increase projected shortfalls • Gap of $14.3M in FY 2026
• Gaps of $10.2M to $0.8M in FY 2027 – FY 2030
Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
60 Packet Pg. 188 of 227

7 • Models the impact of a 1% compensation adjustment once negotiated agreements sunset • Maintains 5% Vacancy Factor
• Increases reserve for potential changes to future labor costs and benefit rate variability • Expenses increase by $1.1M in FY 2026 and increase projected shortfalls • Gap of $13.1M in FY 2026
• Gaps of $9.0M to $6.8M in FY 2027 – FY 2029
ALT SCENARIO B: COMPENSATION ADJUSTMENT IN FY26
Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
61 Packet Pg. 189 of 227

7 FY 2026 BUDGET DEVELOPMENT GUIDELINES (Attachment A)
• Develop a structurally balanced budget to maintain fiscal sustainability • E
xamine appropriate use o f surpluses
• Review resource allocation for City Council’s identified priorities • Focus on business process redesign and explore alternative service de
livery models
• Explore expansion of existing revenue sources or th e addition of new revenue sources
• Continue to prioritize proactively funding long term liabilities 8 Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
62 Packet Pg. 190 of 227

9 ASSUMPTIONS NOT INCLUDED IN FORECAST (Attachment E)
List is not comprehensive nor in any priority order
• Labor Negotiations (contracts expire in Jan/Jun 2025); LRFF includes an estimated reserve for changes in vacancy rates, labor and benefit variability, and inflation
• Housing Growth Impacts
• Cubberley Community Center Redevelopment
• Fire and Ambulance Service Expansion
• Parks Master Plan
• Railroad Grade Separation
• Vehicle Fleet Electrification
Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
63 Packet Pg. 191 of 227

7 Next Steps Annual Budget Process
• Jan 2025: Council review LRFF
• Feb 2025: FY 2025 Mid-Year Budget
• May 2025: FY 2026 Proposed Budget

CONCLUSION AND NEXT STEPS
10 • 2026-2 035 LRFF is fairly consistent with FY 2025 Adopted Budget • Economic stagnation and potential volatility
• Focus on i nvesting in key areas of priority or urgent needs • Uncertainty Reserve and one-t ime surpluses are critical to manage the near-term fiscal stability and investments in priority initiatives • Strategic planning and fiscal discipline needed to solve estimated shortfalls in s
ubsequent years of the forecast
• Policy planning tool that informs the budget process.

Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
64 Packet Pg. 192 of 227

11 RECOMMENDED ACTION
Staff recommends that the Finance Committee:

Review and recommend that the City Council accept the Fiscal Year 2026 – 2035 Long Range Financial Forecast Base Case and the FY 2026 Budget Development Guidelines (Attachment A).

Direct staff to use this forecast as a starting point for theFY 2026 budget process.

Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
65 Packet Pg. 193 of 227

Paul Harper
Budget Manager
[email protected]
Kitty Dandan
Budget Manager
[email protected]
Attachment I
Item 12
Attachment I - FY 2026-2035 Long
Range Financial Forecast (LRFF), CMR
2405-3068

Item 12: Staff Report
Pg.
66 Packet Pg. 194 of 227

City Council
Staff Report
From: City Manager
Report Type: INFORMATION REPORTS
Lead Department: Planning and Development Services
Meeting Date: January 13, 2025
Report #:2411-3781
TITLE
Accessory Dwelling Unit (ADU) - 2024 Quarter 3 (July - September 2024) Report

RECOMMENDATION
This is an informational report, and no action is required.

ANALYSIS
This report transmits information related to application activity for accessory dwelling units (ADU), including junior accessory dwelling units (JADU) for quarters 1 through 3 of calendar year 2024. Since 2015, the City has received 772 ADU/JADU building permit applications and issued 642 building permits. In quarters 1 through 3 of 2024, the City received 108 new applications, issued 92 ADU permits, and provided an approved Final Inspection on 75 ADU/JADU permits. As it relates to the Housing Element, the data continues to support the anticipated housing unit production expected from ADU/JADUs for the current housing element cycle, which is an average of 64 units per year over the 8-year planning period or a total of 512 units.

In the first 3 quarters of 2024, the ADU sizes of open applications in this period range from 165 to 1,000 square feet, with an average size of 559 square feet. Approximately 45% of applications are located north of Oregon Expressway, and 55% are located south of Oregon Expressway. Since 2017, the majority of ADU/JADU permits relative to the Oregon Expressway has shifted between north and south from year to year. Further details can be found in Table 1 of Attachment A.

FISCAL/RESOURCE IMPACT
This action has no fiscal impact.

ATTACHMENTS
Attachment A: Table 1 - Q3 2024 ADU Data
APPROVED BY:

Jonathan Lait, Planning and Development Services Director Item 13
Item 13 Staff Report

Item 13: Staff Report
Pg.
1 Packet Pg. 195 of 227

Table 1: Summary of ADU Permits from 2015-2024 (Q1-Q3)
Category 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 (Q1-Q3)
New ADU Applications
Filed1 10 9 28 55 75 78 136 151 122 108
Permits: Ready to Issue
(City Approved)2 8 5 12 39 62 46 112 127 135 96
Permits: Issued (Permit
Obtained)3 8 5 12 36 62 43 89 120

125 92
Permits: Final Inspection
Approved4 3 4 9 12 33 46 37 62 101 75
Permits Expired 1 1 1 5

Detached ADUs
(Submitted)5 20 35 52 52 80 80 48 45
Detached ADUs (Issued)5 8 24 41 33 55 64 57 34

Attached ADUs
(Submitted)6 8 20 23 20 56 44 43 40
Attached ADUs (Issued)6 4 11 21 9 34 32 40 42

Junior ADUs (Submitted)7 1 1 1 25 27 31 23
Junior ADUs (Issued)7 1 1 1 9 24 28 16
Item 13
Attachment A - Table 1 - Q3 2024
ADU Data

Item 13: Staff Report
Pg.
2 Packet Pg. 196 of 227

Category 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 (Q1-Q3)
Average Application
Processing Time (Days
Including Weekends)8
127 214 118 183 135 197 162 193 187 192
Average Construction
Time (Days Including
Weekends)
9 578 751 330 287 173 262 455 431 496 505

City Impact Fees
Collected for New
ADUs10
$451,514 $402,012 $198,962 $44,057 $139,592 $540,453

$487,322 $389,253

ADU Size Smallest 150 SF 159 SF 220 SF 208 SF 178 SF 192 SF 227 SF 165 SF ADU Size Largest 900 SF 900 SF 1,031 SF 1,000 SF 1,218 SF 2,217 SF 1000 SF 1000 SF Average ADU Size 470 SF 469 SF 383 SF 518 SF 550 SF 589 SF 571 SF 559 SF

ADU Location
Relative to
Oregon
Expressway
North 46% 49% 52% 55% 49% 52% 41% 45%
South 54% 51% 48% 45% 51% 48% 59% 55%

Source: City of Palo Alto Accela Data January 2015 through October 2024

Item 13
Attachment A - Table 1 - Q3 2024
ADU Data

Item 13: Staff Report
Pg.
3 Packet Pg. 197 of 227

Notes:

1. Any ADU/JADU Application SUBMITTED for the year

2. Any ADU/JADU application Permit 'READY TO Issue' for the year (regardless of when it was submitted)

3. Any ADU/JADU Permit ISSUED for the year (regardless of when it was submitted)

4. Any ADU/JADU Permit receiving a Final Inspection (Ready to Occupy) for the year, regardless of when the application wassubmitted. Years 2015-2017 data point not available.

5. Any Detached ADU Permit Application submitted for the year/Any Detached ADU Permit Issued for the year, regardless of when the application was submitted. Years 2015-2016 data point not available.

6. Any Attached ADU Permit Application submitted for the year/Any Attached ADU Permit Issued for the year, regardless of when the application was submitted. Years 2015-2016 data point not available.

7. Any JADU Permit Application submitted for the year/Any JADU Permit Issued for the year, regardless of when the application was submitted. Years 2015- 2016 data point not available.

8. Average number of days from permit application submittal to when permit is approved and ready to issue. This average includes weekends and days application is pending due to applicant preparation of resubmittal or additional information from applicant.

9. Average number of days from permit issued to final inspection completed. This average includes weekends and days staff is waiting for applicant to schedule the next required inspection; it also includes time related to the construction of a primary residence when the J/ADU is built at the same time.

10. Impact Fees collected for ADU’s permitted for the year. Years 2015-2016 data point not available.

Item 13
Attachment A - Table 1 - Q3 2024
ADU Data

Item 13: Staff Report
Pg.
4 Packet Pg. 198 of 227

ADU/JADU Permits Submitted for CY 2024 (Q1) New Construction Conversion Type of Conversion # of
Apps
Dwelling
Type
Project
Location
Zoning
District Date Filed Application Status Attached Detached Attached Detached Garage Other Acc.

Structure
of Space
# of
bdrms ADU Size
1 ADU South R-1 (8000) 1/2/24 Permit Issued x x 0 485 2 ADU North RM-15 1/8/24 Pending Resubmittal x 1 566 3 JADU South R-1 1/11/24 Pending Resubmittal x x 1 478 4 ADU South R-1 1/12/24 Permit Issued x 1 461 5 ADU South R-1 (7000) 1/16/24 Permit Issued x x 1 238 6 ADU South R-1 1/29/24 Permit Issued x 2 750 7 ADU North R-1 1/30/24 Permit Issued x x 1 488 8 ADU North R-1 2/1/24 Permit Issued x 1 495 9 ADU South R-1 2/1/24 Pending Resubmittal x 1 600 10 ADU North R-1 2/2/24 Pending Resubmittal x 1 300 11 JADU North R-1 2/5/24 Permit Issued x 1 479 12 ADU South R-1 2/7/24 Permit Issued x 2 749 13 ADU North R-1 2/9/24 Pending Resubmittal x 1 324 14 ADU North R-1 2/10/24 Permit Issued x x 1 412 15 JADU North R-1 2/12/24 Permit Issued x 1 493 16 JADU South R-1 2/13/24 Finaled x x 1 357
17 ADU South R-1 (S) 2/14/24 Permit Issued x x 1 519 18 ADU North R-1 2/15/24 Permit Issued x x 2 720 19 ADU North R-1 2/20/24 Permit Issued x 1 536 20 ADU South R-1 2/27/24 Permit Issued x x 1 337 21 ADU South R-1 2/29/24 Permit Issued x 1 750 22 ADU South R-1 2/29/24 Pending Resubmittal x x 1 402 23 ADU South R-1 2/29/24 Permit Issued x 2 749 24 ADU South R-1 3/5/24 Permit Issued x 2 805 25 ADU North RM-15 3/5/24 Submitted x x 1 645
26 ADU South R-1 (S) 3/6/24 Pending Resubmittal x 2 750 27 ADU North R-1 (10000) 3/6/24 Permit Issued x x 1 524 28 ADU South R-1 (8000) 3/12/24 Permit Issued x 0 608 29 ADU North R-1 3/13/24 Permit Issued x x 0 392 30 ADU North R-1 3/13/24 Permit Issued x 2 749 31 ADU North R-1 3/15/24 Pending Resubmittal x x 1 479 Item 13
Attachment A - Table 1 - Q3 2024
ADU Data

Item 13: Staff Report
Pg.
5 Packet Pg. 199 of 227

ADU/JADU Permits Submitted for CY 2024 (Q2) New Construction Conversion Type of Conversion # of
Apps
Dwelling
Type
Project
Location
Zoning
District Date Filed Application Status Attached Detached Attached Detached Garage Other Acc.

Structure
or Space
# of
bdrms ADU Size
40 ADU South R-1 4/2/24 Permit Issued x 1 766 41 ADU South R-1 4/3/24 Permit Issued x 1 750 42 JADU South R-1 4/4/24 Pending Resubmittal x x 1 270 43 JADU North R-1 4/5/24 Pending Resubmittal x 1 366 44 ADU North R-1 4/5/24 Pending Resubmittal x 1 432 45 ADU North R-1 4/9/24 Permit Issued x 1 534 46 ADU North R-1 4/10/24 Pending Resubmittal x x 2 750 47 JADU North R-1 4/12/24 Permit Issued x 1 400 48 ADU South R-1 4/12/24 Pending Resubmittal x 1 399 49 ADU North R-1 4/15/24 Pending Resubmittal x 0 567 50 ADU North R-1 4/16/24 Permit Issued x x 1 275 51 ADU North R-1 4/19/24 Permit Issued x 1 534 52 ADU South RM-15 4/23/24 Pending Resubmittal x 1 400 53 JADU North R-1 (10000) 4/24/24 Permit Issued x 1 165 54 JADU South R-1 5/3/24 Pending Resubmittal x x 1 400 55 ADU North R-1 5/7/24 Pending Resubmittal x x 1 261 56 ADU North R-1 5/9/24 Pending Resubmittal x x 0 340

ADU/JADU Permits Submitted for CY 2024 (Q1) New Construction Conversion Type of Conversion # of
Apps
Dwelling
Type
Project
Location
Zoning
District Date Filed Application Status Attached Detached Attached Detached Garage Other Acc.

Structure
or Space
# of
bdrms ADU Size
32 ADU South RE 3/15/24 Incomplete x x 1 675
33 ADU North R-2 3/18/24 Permit Issued x x 1 360 34 ADU South R-1 3/19/24 Permit Issued x 2 743 35 ADU North R-1 (10000) 3/19/24 Permit Issued x 2 868 36 ADU South R-1 (8000) 3/20/24 Pending Resubmittal x 1 523 37 ADU South R-1 3/21/24 Permit Issued x 2 750 38 JADU North R-1 3/26/24 Pending Resubmittal x x 1 196 39 ADU South R-1 3/28/24 Permit Issued x 2 1,000 Item 13
Attachment A - Table 1 - Q3 2024
ADU Data

Item 13: Staff Report
Pg.
6 Packet Pg. 200 of 227

ADU/JADU Permits Submitted for CY 2024 (Q3) New Construction Conversion Type of Conversion # of
Apps
Dwelling
Type
Project
Location
Zoning
District
Date
Filed Application Status Attached Detached Attached Detached Garage Other Acc.

Structure
or Space
# of
bdrms ADU Size
75 ADU North R-1 7/3/24 Permit Issued x x 1 551 76 ADU South R-1 7/16/24 Pending Resubmittal x 1 796 77 ADU South R-1 7/16/24 Pending Resubmittal x 1 495 78 JADU North R-1 7/17/24 In Plan Check x x 1 361 79 JADU North R-1 7/18/24 In Plan Check x x 1 411 80 ADU South R-1 7/19/24 Pending Resubmittal x 2 798 81 JADU South R-1 7/23/24 Pending Resubmittal x 1 494 82 ADU North R-1 (10000) 7/25/24 Pending Resubmittal x 0 678 83 ADU South R-1 7/30/24 Pending Resubmittal x x 1 326 84 ADU North R-1 7/30/24 In Plan Check x 2 438 ADU/JADU Permits Submitted for CY 2024 (Q2) New Construction Conversion Type of Conversion # of
Apps
Dwelling
Type
Project
Location
Zoning
District Date Filed Application Status Attached Detached Attached Detached Garage Other Acc.

Structure
or Space
# of
bdrms ADU Size
57 JADU South R-1 5/10/24 In Plan Check x x 1 238 58 ADU South R-1 (8000) 5/14/24 In Plan Check x 2 809 59 JADU South R-1 5/16/24 Permit Issued x x 1 451 60 ADU North R-1 5/23/24 In Plan Check x x 1 553 61 ADU South R-1 (7000) 5/28/24 Permit Issued x 2 609 62 JADU South R-1 5/30/24 In Plan Check x 1 476 63 ADU South R-1 5/30/24 In Plan Check x 2 800 64 ADU North R-1 (10000) 6/3/24 Pending Resubmittal x 2 800 65 JADU South R-1 6/4/24 Permit Issued x 1 500 66 ADU North R-1 6/4/24 Permit Issued x x 1 445 67 ADU North R-1 6/5/24 Pending Resubmittal x 1 355 68 ADU South R-1 6/7/24 Permit Issued x 2 749 69 JADU South R-1 6/13/24 In Plan Check x 1 466 70 ADU South RM-30 6/13/24 In Plan Check x 1 565 71 ADU South R-1 6/17/24 Pending Resubmittal x x 1 613 72 JADU North R-1 6/19/24 In Plan Check x 1 478 73 ADU South R-1 (7000) 6/20/24 In Plan Check x 1 735 74 ADU South R-1 6/24/24 Pending Resubmittal x 1 798 Item 13
Attachment A - Table 1 - Q3 2024
ADU Data

Item 13: Staff Report
Pg.
7 Packet Pg. 201 of 227

ADU/JADU Permits Submitted for CY 2024 (Q3) New Construction Conversion Type of Conversion # of
Apps
Dwelling
Type
Project
Location
Zoning
District
Date
Filed Application Status Attached Detached Attached Detached Garage Other Acc.

Structure
or Space
# of
bdrms ADU Size
85 ADU North R-1 7/31/24 In Plan Check x x 1 413 86 ADU North R-2 8/12/24 Pending Resubmittal x 2 672 87 ADU South R-1 8/16/24 Pending Resubmittal x x 1 494 88 ADU South R-1 8/16/24 Pending Resubmittal x 2 1,000 89 ADU South R-1 (S) 8/19/24 Pending Resubmittal x x 1 360 90 ADU South R-1 8/20/24 Pending Resubmittal x 1 522 91 ADU South R-1 8/21/24 Pending Resubmittal x 3 1,000 92 JADU South R-2 8/27/24 Pending Resubmittal x 1 499 93 ADU North R-1 8/27/24 Pending Resubmittal x 1 667 94 ADU South R-1 (8000) 8/29/24 Pending Resubmittal x 1 799 95 ADU South R-1 (7000)(S) 9/4/24 Pending Resubmittal x 2 520 96 JADU North R-1 (10000) 9/5/24 Pending Resubmittal x x 0 483 97 ADU North R-1 9/5/24 Pending Resubmittal x 2 921 98 ADU North R-1 9/5/24 Pending Resubmittal x 2 991 99 ADU South R-1 9/9/24 In Plan Check x 1 800 100 ADU North R-1 9/10/24 Pending Resubmittal x x 0 292 101 ADU South R-1 9/10/24 In Plan Check x 1 800 102 JADU South R-1 9/12/24 In Plan Check x 1 390 103 ADU North R-1 9/18/24 Pending Resubmittal x 0 336 104 ADU North R-1 (10000) 9/19/24 Pending Resubmittal x 2 748 105 JADU South R-1 9/20/24 In Plan Check x 0 423 106 ADU North R-1 9/24/24 In Plan Check x 1 749 107 ADU South R-1 9/25/24 In Plan Check x 1 435 108 ADU South R-1 9/27/24 In Plan Check x 3 950

Item 13
Attachment A - Table 1 - Q3 2024
ADU Data

Item 13: Staff Report
Pg.
8 Packet Pg. 202 of 227

City Council
Staff Report
From: City Manager
Report Type: INFORMATION REPORTS
Lead Department: City Manager
Meeting Date: January 13, 2025
Report #:2410-3572
TITLE
Update on Palo Alto Homekey (Interim Housing Shelter at 1237 San Antonio Road)

RECOMMENDATION
This is an informational report as a status update on the Palo Alto Homekey project. No Council action is requested.

BACKGROUND
Project Homekey is an initiative of the California Department of Housing and Community Development (HCD) that supports eligible entities, including local governments, in forming partnerships with the State to purchase, renovate, or lease diverse housing options. These developments offer temporary or permanent homes for individuals facing homelessness and those vulnerable to health issues. To expedite housing solutions, Project Homekey offers numerous regulatory waivers and enforces strict timelines.

In 2021, the City partnered with LifeMoves to apply for Homekey funding for a modular interim housing facility that includes on-site support services and was awarded the funds in August 2022. In November 2022, the City and LifeMoves reassessed the project’s scope due to sharp cost increases driven by economic instability, high inflation, and supply chain disruptions.

LifeMoves engaged a new construction firm, Devcon, in December 2022. Although the change led to identified cost savings, it also impacted the construction timeline as the team revised project plans. Proposed savings included adjustments such as relocating the fire loop road, creating separate entrances for GreenWaste and the Palo Alto Homekey site, and repositioning buildings away from San Antonio Road to avoid interference with an existing gas line.

On June 12, 2023, City Council approved a lease agreement with LifeMoves for use of 1237 San Antonio Road for a term of nine years and approved a revenue agreement with Santa Clara County to enable the County to execute an operating agreement with LifeMoves for interim Item 14
Item 14 Staff Report

Item 14: Staff Report
Pg.
1 Packet Pg. 203 of 227

housing operations.1 Additionally, Council approved $4.5 million in the City’s annual budget for the project, consisting of $2 million to help close the project’s capital funding gap, $500,000 to cover City permit fees, and $2 million to reinstate certain project elements removed as cost savings (decorative fencing, shade sails, photovoltaic system, electric vehicle charging, and storage/trash enclosure fire sprinklers). Later that summer, in August 2023, Council approved an extraterritorial utility service agreement with the City of Mountain View to connect the Homekey project to City of Mountain View water and sewer utility services.2

ANALYSIS
Project Update
The below timeline highlights some milestones in the Homekey project since the last time a related item appeared before Council.

Table 1 Palo Alto Homekey Project Recent Milestones
Date Milestone
September 2023 HCD approved an extension for the Homekey project, allowing construction to be completed by February 2025. This approval followed extensive advocacy efforts by the City, in partnership with Palo Alto’s state delegation, Santa Clara County, and Townsend Public Affairs.

October 2023 The City of Palo Alto and partners broke ground at the Homekey site.3 January 2024 The City facilitated a Good Neighbor Agreement between LifeMoves and GreenWaste to proactively address potential noise impacts.4 The City issued the building permit.

Modular unit construction begins at an offsite factory in Pennsylvania.

June 2024
City Council approved $185,000 in Community Development Block Grant (CDBG) funds for an on-site play structure and recreation area.5 September 2024 Overall construction is 67% complete as of September 31 and the first shipment of modulars arrived.

December 2024 Modular production is 100% complete. Overall construction is 75% complete.
1 City Council Staff Report, June 12, 2023
https://cityofpaloalto.primegov.com/meetings/ItemWithTemplateType?id=2481&meetingTemplateType=2 2 City Council Staff Report, August 21, 2023
https://cityofpaloalto.primegov.com/meetings/ItemWithTemplateType?id=2894&meetingTemplateType=2 3 City of Palo Alto Press Release, October 31, 2023 News Release: Officials Break Ground on Homekey Palo Alto – City of Palo Alto, CA
4 See Attachment B: Good Neighbor Agreement.
5 Council Report, June 22, 2024,
https://cityofpaloalto.primegov.com/meetings/ItemWithTemplateType?id=5122&meetingTemplateType=2&comp iledMeetingDocumentId=10522
Item 14
Item 14 Staff Report

Item 14: Staff Report
Pg.
2 Packet Pg. 204 of 227

By early October 2024, the construction team had completed installing underground utilities, pouring the building pads, installing the elevator, framing the community building, and delivering three modular housing units. However, there have been significant delays relating to modular production. These delays, as detailed in the memo from LifeMoves included as Attachment A, have been mitigated as much as feasible by focusing on sitework and changing construction activity sequencing (e.g., installing light posts). The initial anticipated date to set the modulars was November, but as of mid-December, 45 modules, approximately 2/3 of the total units had arrived in California. These units require additional mechanical component installation and exterior finishing once delivered in California. Once all units have arrived, been finished and set, the construction team will provide a recovery schedule. Upon receipt of the recovery schedule, staff will inform Council of overall schedule impacts. Should the recovery schedule be insufficient to meet the required HCD deadlines, the City, Santa Clara County, and LifeMoves will request an extension with HCD.

FISCAL/RESOURCE IMPACT
This report is for information sharing only. No additional funding is requested with this item. As reported previously, the Palo Alto Homekey project is funded with $26.6 million in Project Homekey funds from HCD, combined with City and Santa Clara County funding, generous local donations, including from Palo Alto Community Fund, Sobrato Philanthropies, and The Peery Foundation. The City’s initial financial contributions to the project included land for the project, staff time, and a pledge of $1 million a year towards operations, for seven years. In response to a capital funding gap, last year City Council approved contributing $4.5 million to capital costs, consisting of $2 million towards unspecified capital costs, $2 million towards specific project elements (solar and EV chargers, decorative fencing, and sunshade sails). Additionally, earlier this year, the City approved $185,000 in CDBG funds towards a recreation area.

STAKEHOLDER ENGAGEMENT
Stakeholder engagement includes regular and additional as-needed meetings between partners (LifeMoves, Santa Clara County Office of Supportive Housing, and Santa Clara County Housing Authority). Staff and LifeMoves will plan press events during significant milestones such as when the units are being stacked/set and at the opening of the facility. Also, this informational report serves as an update to the public about the project status.

ENVIRONMENTAL REVIEW
This item is presented only for Council’s information and therefore it is not a project subject to environmental review by the California Environmental Quality Act (CEQA).

ATTACHMENTS
Attachment A: Schedule Update Memo
Attachment B: Good Neighbor Agreement
Item 14
Item 14 Staff Report

Item 14: Staff Report
Pg.
3 Packet Pg. 205 of 227

APPROVED BY:

Ed Shikada, City Manager
Item 14
Item 14 Staff Report

Item 14: Staff Report
Pg.
4 Packet Pg. 206 of 227

2550 Great America Way, Suite 201
Santa Clara, CA 95054
650.685.5880
www.lifemoves.org
Board of Directors
Melissa Selcher
CHAIR
Lori Castillo Martinez
1st VICE CHAIR
Lauren Koenig
2nd VICE CHAIR
Greg Eckert

TREASURER
Pamela Weiss

SECRETARY
Sheriff Christina Corpus
Ahmed Khatib
May Topper
Danielle Fontaine
Laura Green
Ajwang Rading
Carrie O. Plietz
Tammy Crown
Leslie Little
Chair Emeritus Circle
Patrick Heron
Rod Ferguson
Marcia Pade
Christina Dickerson
William “Bill” Regan
Joe Stockwell
CEO
Aubrey Merriman
LifeMoves
2550 Great America Parkway, Suite 201
Santa Clara, CA 95054
December 18, 2024
Palo Alto City Council
250 Hamilton Ave
Palo Alto, CA 94301
RE: Palo Alto Homekey Schedule Update
Dear City Council Members,
Progress has continued both onsite and offsite for the Palo Alto Homekey Project.

Since our last update, we have completed the following items:
ü Completed fabrication of the modular units in Berwick, PA ü Completed all site work that is feasible prior to setting modules ü Connected to Palo Alto Electric with permanent power anticipated any day ü Finished the exteriors for the community building and elevator shaft ü Delivered most modular units to a staging yard, with all units anticipated to be delivered by end of December
o Modules at staging yard: 45
o Modules in transit from PA: 21
o Modules in PA ready to ship: 1
This project has encountered and successfully navigated a series of unique challenges inherent to modular construction. O ur modular manufacturing supplier, VBC, made the strategic decision to shift production from their anticipated Tracy, California facility to their main factory in Berwick, Pennsylvania. While this move ultimately ensured the highest quality housing units by leveraging VBC's experienced workforce and established production lines, it did necessitate adjustments to our initial timeline.

Despite a slower-than-anticipated start, production steadily increased as the factory crews gained familiarity w it h the intricacies of our specific modules. We are pleased to report that production is now 100% complete. VBC has attributed the initial production delay to the integration of cast i r on plumbing, a unique requirement for our project not standard in East Coast construction, and the ongoing challenges of filling all vacant positions within their factory.

Currently, 21 modules are en route to staging yard, facing the potential delays of winter
weather conditions. We are closely monitoring their transit and projecting their arrival at the staging yard before the end of the year. Upcoming phases of construction, particularly siding, roofing, and the crucial setting of the modules, are weather
dependent. Significant rain or wind could impact the overall schedule in the coming months. However, once t he modules are set, interior finish wor k can Item 14
Attachment A - Schedule
Update Memo

Item 14: Staff Report
Pg.
5 Packet Pg. 207 of 227

2550 Great America Way, Suite 201
Santa Clara, CA 95054
650.685.5880
www.lifemoves.org
Board of Directors
Melissa Selcher
CHAIR
Lori Castillo Martinez
1st VICE CHAIR
Lauren Koenig
2nd VICE CHAIR
Greg Eckert

TREASURER
Pamela Weiss

SECRETARY
Sheriff Christina Corpus
Ahmed Khatib
May Topper
Danielle Fontaine
Laura Green
Ajwang Rading
Carrie O. Plietz
Tammy Crown
Leslie Little
Chair Emeritus Circle
Patrick Heron
Rod Ferguson
Marcia Pade
Christina Dickerson
William “Bill” Regan
Joe Stockwell
CEO
Aubrey Merriman
proceed largely unaffected by winter weather. Proactively, we accelerated the paving of the site, which will help mitigate potential weather-related delays.

Our dedicated team, in close collaboration with our general contractor, DevCon, remains committed to maximizing site work progress in preparation for the modules' arrival. This involves a modified sequencing of site elements to ensure efficient integration with the modules once they are set.

Due to the factors outlined above, the projected completion date has been adjusted from January 2025 to June 2025, with initial occupancy expected to follow in July 2025. DevCon is diligently developing a comprehensive recovery schedule that explores all options to accelerate the project timeline. This schedule will be finalized and confirmed once the modules are successfully set.

We remain steadfast in our commitment to delivering this project with the highest levels of quality and efficiency. We are confident that this development will be a source of pride for the community and will provide exceptional living spaces for our future clients.

Regards
Paul Simpson
Chief Financial Officer
Item 14
Attachment A - Schedule
Update Memo

Item 14: Staff Report
Pg.
6 Packet Pg. 208 of 227

Main Project Site
Staging Yard
Item 14
Attachment A - Schedule
Update Memo

Item 14: Staff Report
Pg.
7 Packet Pg. 209 of 227

Interior shots from production line in Berwick, PA

Item 14
Attachment A - Schedule
Update Memo

Item 14: Staff Report
Pg.
8 Packet Pg. 210 of 227

Item 14
Attachment A - Schedule
Update Memo

Item 14: Staff Report
Pg.
9 Packet Pg. 211 of 227

Item 14
Attachment A - Schedule
Update Memo

Item 14: Staff Report
Pg.
10 Packet Pg. 212 of 227

Good Neighbor Agreement
LifeMoves Palo Alto

LifeMoves and the City of Palo Alto ( “Developers”) are joint applicants coordinating the development and construction of a shelter at 1237 San Antonio Road, Palo Alto (“Project”). LifeMoves will be the Lead Service Provider (LSP) at the Project, serving households experiencing homelessness (“Clients”).

Developers have conducted a Noise Study, prepared by Salter and dated May 12, 2023, and will implement the recommendations contained within the Noise Study. The Noise Study was developed to analyze the potential impacts associated with operations from GreenWaste of Palo Alto, LLC (“GreenWaste”), which is contracted by the City of Palo Alto to provide refuse services in the City.

GreenWaste had no input into the Noise Study. Developers, LSP, and GreenWaste met on October 12, 2023, to discuss potential noise impacts and proactively address them.

In order to facilitate a good neighbor relationship, this document formally acknowledges that Developers, LSP, and GreenWaste understand the following to be true:
 GreenWaste operations are expected to typically begin each morning at 3:00 AM and conclude by 5:00 PM. Normal operations include noise associated with trucks, including but not limited to backing up (i.e. “beeping”), and picking up/setting down large metal containers.  Prior to intake, LSP will inform Clients of the anticipated noise impacts associated with living at the property.
 LSP will offer noise mitigation tools to Clients, which may include earplugs or white noise machines.
 GreenWaste will not exceed the noise levels permitted under the Palo Alto Municipal Code.  GreenWaste will use electric vehicles at the site as often as possible if available and commercially reasonable to perform the work (electric vehicles are quieter than diesel operated vehicles).
 When commercially reasonable, GreenWaste will prioritize container pick up and drop off at the rear of the site, as far from the Project as possible under current operations.  Both parties will be in communication with one another if circumstances change materially on either site.
 Contact information is provided for representatives below. In the event that contact information or designated contact person changes, all parties shall be notified and provided new contact information.

Contact Information
LSP: Andrew Niklaus
Interim Chief Program Officer
LifeMoves
(650) 685-5880
[email protected]

GreenWaste: Eric Cissna
General Manager
GreenWaste of Palo Alto, LLC
(650) 798-5994
[email protected]
DocuSign Envelope ID: EDAD815E-0EB3-461A-BE1B-D47CC810D784 Item 14
Attachment B - Good
Neighbor Agreement

Item 14: Staff Report
Pg.
11 Packet Pg. 213 of 227

We, signed below, have read and agree to the terms in this Good Neighbor Agreement.

_________________________________
Eric Cissna
General Manager
GreenWaste of Palo Alto, LLC

_________________________________
Andrew Niklaus
Interim Chief Program Officer
LifeMoves
DocuSign Envelope ID: EDAD815E-0EB3-461A-BE1B-D47CC810D784 Item 14
Attachment B - Good
Neighbor Agreement

Item 14: Staff Report
Pg.
12 Packet Pg. 214 of 227

City Council
Staff Report
Report Type: INFORMATION REPORTS
Lead Department: City Clerk
Meeting Date: January 13, 2025
Report #:2407-3293
TITLE
Boards, Commissions, and Committees Annual Attendance Report; CEQA Status - Not a Project

RECOMMENDATION
This is an informational report, and no action is recommended.

BACKGROUND
The Boards, Commissions, and Committees (BCC) Handbook specifies that a compilation of attendance will be submitted to the City Clerk and presented to City Council at least annually listing absences for all commissions/committee members.

ANALYSIS
The Board, Commissions, and Committees (BCCs) plays a crucial role in fostering civic engagement within the community. Regular attendance by all members is essential to ensure meaningful public participation. The BCC Handbook requires a compilation of absences for all commissions/committee members be submitted to the City Council annually. The Handbook places an emphasis on the significance of consistent attendance and outlines the policies surrounding absences. Members are expected to make every effort to attend all scheduled meetings. Should a member be absent from more than one-third of the BCC meetings within a calendar year, their absences will be reported to the City Council, which could result in removal from the BCC.

FISCAL/RESOURCE IMPACT
There is no Fiscal/Resource Impact.

STAKEHOLDER ENGAGEMENT
Staff collaborated with the assigned administrative support to compile a comprehensive report detailing the attendance and absences of the members and commissioners.

ENVIRONMENTAL REVIEW
Item 15
Item 15 Staff Report

Item 15: Staff Report
Pg.
1 Packet Pg. 215 of 227

Council action on this item is not a project as defined by CEQA because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. CEQA Guidelines section 15378(b)(5).

ATTACHMENTS
Attachment A: Boards, Commissions, and Committees Total Absences for 2024 and 2023 APPROVED BY:

Mahealani Ah Yun, City Clerk
Item 15
Item 15 Staff Report

Item 15: Staff Report
Pg.
2 Packet Pg. 216 of 227

BOARDS, COMMITTEE, & COMMISSIONS TOTAL ABSENCES
2024

Name Board, Committee, Commission Total
Mousam Adcock Architectural Review Board
Peter Baltay Architectural Review Board
Yingxi Chen Architectural Review Board 1
David Hirsch Architectural Review Board
Kendra Rosenberg Architectural Review Board 1

Alisa Eagleston-Cieslewicz Historic Resources Board 1 Gogo Heinrich Historic Resources Board 4
Michael Makinen Historic Resources Board 3
Christian Pease Historic Resources Board
Samantha Rohman Historic Resources Board
Gedes Ulinskas Historic Resources Board
Caroline Willis Historic Resources Board
Margaret Wimmer Historic Resources Board 3

Katie Causey Human Relations Commission 1
Donald Barr Human Relations Commission
Adriana Eberle Human Relations Commission 1
Amy Hsieh Human Relations Commission 3
Michelle Kraus Human Relations Commission 1
Tracy Navichoque Human Relations Commission
Daryl Savage Human Relations Commission 1
Kalona Smith Human Relations Commission 4
Mary Kate Stimmler Human Relations Commission 1

Amanda Brown Parks and Recreation Commission 2
Anne Warner Cribbs Parks and Recreation Commission
Yudy Deng Parks and Recreation Commission
Nellis Freeman Parks and Recreation Commission
Item 15
Attachment A - Boards,
Commissions, and
Committees Total
Absences for 2024 and
2023

Item 15: Staff Report
Pg.
3 Packet Pg. 217 of 227

Jeff Greenfield Parks and Recreation Commission 2
Shani Kleinhaus Parks and Recreation Commission 1
Joy Oche Parks and Recreation Commission
Bing Wei Parks and Recreation Commission 3

Allen Akin Planning and Transportation Commission
Bryna Chang Planning and Transportation Commission
Barton Hechtman Planning and Transportation Commission 1 George Lu Planning and Transportation Commission 1
Keith Reckdahl Planning and Transportation Commission 1 Doria Summa Planning and Transportation Commission
Carolyn Templeton Planning and Transportation Commission 1

Loren Gordon Public Art Commission 1
Tara De La Garza Public Art Commission
Ben Miyaji Public Art Commission 2
Hsinya Shen Public Art Commission
Amber Smith Public Art Commission 1
Harriet Stern Public Art Commission 1
Lisa Waltuch Public Art Commission 2

Gregory Bennet Storm Water Management Oversight Committee David Bower Storm Water Management Oversight Committee 1 Marilyn Keller Storm Water Management Oversight Committee 1 Hal Mickelson Storm Water Management Oversight Committee Kevin Mayer Storm Water Management Oversight Committee Dena Mossar Storm Water Management Oversight Committee Ron Owes Storm Water Management Oversight Committee 1 Ambika Pajjuri Storm Water Management Oversight Committee Catherine Perman Storm Water Management Oversight Committee Bob Wenzlau Storm Water Management Oversight Committee 2

Rachel Croft Utilities Advisory Commission 1
Item 15
Attachment A - Boards,
Commissions, and
Committees Total
Absences for 2024 and
2023

Item 15: Staff Report
Pg.
4 Packet Pg. 218 of 227

Utsav Gupta Utilities Advisory Commission
Meagan Mauter Utilities Advisory Commission 1
Phil Metz Utilities Advisory Commission 1
Robert Phillips Utilities Advisory Commission
Greg Scharff Utilities Advisory Commission 2
Chris Tucher Utilities Advisory Commission

BOARDS, COMMITTEE, & COMMISSIONS TOTAL ABSENCES
2023

Name Board, Committee, Commission Total
Mousam Adcock Architectural Review Board
Peter Baltay Architectural Review Board
Yingxi Chen Architectural Review Board 1
David Hirsch Architectural Review Board
Kendra Rosenberg Architectural Review Board
Osma Thompson Architectural Review Board 3

Item 15
Attachment A - Boards,
Commissions, and
Committees Total
Absences for 2024 and
2023

Item 15: Staff Report
Pg.
5 Packet Pg. 219 of 227

David Bower Historic Resources Board
Alisa Eagleston-
Cieslewicz
Historic Resources Board 1
Gogo Heinrich Historic Resources Board 3
Michael Makinen Historic Resources Board 4
Christian Pease Historic Resources Board 4
Samantha Rohman Historic Resources Board 1
Caroline Willis Historic Resources Board 1
Margaret Wimmer Historic Resources Board 1

Katie Causey Human Relations Commission 2
Adriana Eberle Human Relations Commission 1
Amy Hsieh Human Relations Commission 1
Michelle Kraus Human Relations Commission 1
Tracy Navichoque Human Relations Commission 1
Daryl Savage Human Relations Commission 1
Kalona Smith Human Relations Commission 3
Mary Kate Stimmler Human Relations Commission 3

Amanda Brown Parks and Recreation Commission
Anne Warner Cribbs Parks and Recreation Commission
Nellis Freeman Parks and Recreation Commission 1
Jeff Greenfield Parks and Recreation Commission 2
Shani Kleinhaus Parks and Recreation Commission
Joy Oche Parks and Recreation Commission
Bing Wei Parks and Recreation Commission 2

Allen Akin Planning and Transportation Commission
Bryna Chang Planning and Transportation Commission 1
Barton Hechtman Planning and Transportation Commission 3 George Lu Planning and Transportation Commission 1
Giselle Roohparvar Planning and Transportation Commission 3 Keith Reckdahl Planning and Transportation Commission 6 Item 15
Attachment A - Boards,
Commissions, and
Committees Total
Absences for 2024 and
2023

Item 15: Staff Report
Pg.
6 Packet Pg. 220 of 227

Doria Summa Planning and Transportation Commission
Carolyn Templeton Planning and Transportation Commission 2

Loren Gordon Public Art Commission 3
Ben Miyaji Public Art Commission
Hsinya Shen Public Art Commission 1
Nia Taylor Public Art Commission 2
Lisa Waltuch Public Art Commission 1

David Bower

Storm Water Management Oversight Committee 1
Marilyn Keller Storm Water Management Oversight Committee Kevin Mayer Storm Water Management Oversight Committee Dena Mossar Storm Water Management Oversight Committee Ron Owes Storm Water Management Oversight Committee
Ambika Pajjuri Storm Water Management Oversight Committee Catherine Perman Storm Water Management Oversight Committee Bob Wenzlau Storm Water Management Oversight Committee

Rachel Croft Utilities Advisory Commission
Utsav Gupta Utilities Advisory Commission
Meagan Mauter Utilities Advisory Commission
Phil Metz Utilities Advisory Commission 2
Robert Phillips Utilities Advisory Commission
Lauren Segal Utilities Advisory Commission 1
Greg Scharff Utilities Advisory Commission 2
Chris Tucher Utilities Advisory Commission

Item 15
Attachment A - Boards,
Commissions, and
Committees Total
Absences for 2024 and
2023

Item 15: Staff Report
Pg.
7 Packet Pg. 221 of 227

City Council
Supplemental Report
From: Mahealani Ah Yun, City Clerk
Meeting Date: January 13, 2025
Item Number: 15
Report #:2501-3981
TITLE
SUPPLEMENTAL REPORT: Boards, Commissions, and Committees Annual Attendance Report; CEQA Status - Not a Project

BACKGROUND
Staff identified the number of board and commission meetings held in 2024 and have updated the below table to include the number of meetings held and the percentage of missed meetings per board or commission member.

The Boards, Commissions, and Committees Handbook states that “If you miss more than one- third of the BCC meetings during the calendar year, this will be reported to Council and may result in your removal from the BCC”.

ANALYSIS
The chart below reflects the number of absents, total of meetings attended since appointed term, and percentage. The 33% limit is based off of the one-third rule of the Boards, Commissions, and Committees Handbook. Commissioners who finished their terms before the end of calendar year 2024 have been struck through.

Calculation for the year 2024:

Name Boards, Commissions, and
Committees
Absent Total BCC
Meetings
%
(limit 33%)
Mousam Adcock Architectural Review Board 0 18
Peter Baltay Architectural Review Board 0 18
Yingxi Chen Architectural Review Board 1 18 5%
David Hirsch Architectural Review Board 0 18
Kendra Rosenberg Architectural Review Board 1 18 5%
Item 15
Item 15 Supplemental
Report

Item 15: Staff Report
Pg.
1 Packet Pg. 222 of 227

Name Boards, Commissions, and
Committees
Absent Total BCC
Meetings
%
(limit 33%)
Alisa Eagleston-
Cieslewicz
Historic Resources Board 1 10
Gogo Heinrich Historic Resources Board 4 6 66%
Michael Makinen Historic Resources Board 3 7 42%
Christian Pease Historic Resources Board 0 10
Samantha Rohman Historic Resources Board 0 10
Gedes Ulinskas Historic Resources Board 0 10
Caroline Willis Historic Resources Board 0 10
Margaret Wimmer Historic Resources Board 3 6 50%
Katie Causey Human Relations Commission 1 12 8%
Donald Barr Human Relations Commission 0 12
Adriana Eberle Human Relations Commission 1 12 8%
Amy Hsieh Human Relations Commission 3 12 25%
Michelle Kraus Human Relations Commission 1 12 8%
Tracy Navichoque Human Relations Commission 0 12
Daryl Savage Human Relations Commission 1 12 8%
Kaloma Smith Human Relations Commission 4 12 33%
Mary Kate Stimmler Human Relations Commission 1 12 8%
Amanda Brown Parks and Recreation Commission 2 12 16%
Anne Warner Cribbs Parks and Recreation Commission 0 12 Yudy Deng Parks and Recreation Commission 0 3
Nellis Freeman Parks and Recreation Commission 0 12
Jeff Greenfield Parks and Recreation Commission 2 12 16% Shani Kleinhaus Parks and Recreation Commission 1 12 8% Joy Oche Parks and Recreation Commission 0 8
Bing Wei Parks and Recreation Commission 3 12 25%
Allen Akin Planning and Transportation
Commission
0 18
Bryna Chang Planning and Transportation
Commission
0 18
Item 15
Item 15 Supplemental
Report

Item 15: Staff Report
Pg.
2 Packet Pg. 223 of 227

Name Boards, Commissions, and
Committees
Absent Total BCC
Meetings
%
(limit 33%)
Barton Hechtman Planning and Transportation
Commission
1 18 5%
George Lu Planning and Transportation
Commission
1 18 5%
Keith Reckdahl Planning and Transportation
Commission
1 18 5%
Doria Summa Planning and Transportation
Commission
0 18
Carolyn Templeton Planning and Transportation
Commission
1 18 5%
Loren Gordon Public Art Commission 1 11 9%
Tara De La Garza Public Art Commission 0 7
Ben Miyaji Public Art Commission 2 11 18%
Hsinya Shen Public Art Commission 0 11
Amber Smith Public Art Commission 1 7 14%
Harriet Stern Public Art Commission 1 7 14%
Lisa Waltuch Public Art Commission 2 11 18%
Gregory Bennet Storm Water Management
Oversight Committee
0 1
David Bower Storm Water Management
Oversight Committee
1 2 50%
Marilyn Keller Storm Water Management
Oversight Committee
1 2 50%
Hal Mickelson Storm Water Management
Oversight Committee
0 3
Kevin Mayer Storm Water Management
Oversight Committee
0 1
Dena Mossar Storm Water Management
Oversight Committee
0 3
Ron Owes Storm Water Management
Oversight Committee
1 3 33%
Item 15
Item 15 Supplemental
Report

Item 15: Staff Report
Pg.
3 Packet Pg. 224 of 227

Name Boards, Commissions, and
Committees
Absent Total BCC
Meetings
%
(limit 33%)
Ambika Pajjuri Storm Water Management
Oversight Committee
0 1
Catherine Perman Storm Water Management
Oversight Committee
0 3
Bob Wenzlau Storm Water Management
Oversight Committee
2 2 100%
Rachel Croft Utilities Advisory Commission 1 10 10%
Utsav Gupta Utilities Advisory Commission 1 5 20%
Meagan Mauter Utilities Advisory Commission 1 10 10%
Phil Metz Utilities Advisory Commission 1 10 10%
Robert Phillips Utilities Advisory Commission 1 10 10%
Greg Scharff Utilities Advisory Commission 2 9 22%
Chris Tucher Utilities Advisory Commission 1 5 20%
Calculation for the year 2023
Name Boards, Commissions, and
Committees
Absent Total BCC
Meetings
%
(limit 33%)
Mousam Adcock Architectural Review Board 0 2
Peter Baltay Architectural Review Board 0 10
Yingxi Chen Architectural Review Board 1 10 10%
David Hirsch Architectural Review Board 0 10
Kendra Rosenberg Architectural Review Board 0 10
Osma Thompson Architectural Review Board 3 10 30%
David Bower Historic Resources Board 0 3
Alisa Eagleston-
Cieslewicz
Historic Resources Board 1 14 7%
Gogo Heinrich Historic Resources Board 3 14 21%
Michael Makinen Historic Resources Board 4 14 28%
Christian Pease Historic Resources Board 4 14 28%
Samantha Rohman Historic Resources Board 1 11 9%
Caroline Willis Historic Resources Board 1 14 7%
Item 15
Item 15 Supplemental
Report

Item 15: Staff Report
Pg.
4 Packet Pg. 225 of 227

Name Boards, Commissions, and
Committees
Absent Total BCC
Meetings
%
(limit 33%)
Margaret Wimmer Historic Resources Board 1 14 7%
Katie Causey Human Relations Commission 2 6 33%
Adriana Eberle Human Relations Commission 1 10 10%
Amy Hsieh Human Relations Commission 1 6 16%
Michelle Kraus Human Relations Commission 1 10 10%
Tracy Navichoque Human Relations Commission 1 3 33%
Daryl Savage Human Relations Commission 1 10 10%
Kalona Smith Human Relations Commission 3 10 30%
Mary Kate Stimmler Human Relations Commission 3 6 50%
Amanda Brown Parks and Recreation Commission 0 11
Anne Warner Cribbs Parks and Recreation Commission 0 11 Nellis Freeman Parks and Recreation Commission 1 11
Jeff Greenfield Parks and Recreation Commission 2 11 18% Shani Kleinhaus Parks and Recreation Commission 0 11
Joy Oche Parks and Recreation Commission 0 11
Bing Wei Parks and Recreation Commission 2 11 18%
Allen Akin Planning and Transportation
Commission
0 15
Bryna Chang Planning and Transportation
Commission
1 19 5%
Barton Hechtman Planning and Transportation
Commission
3 19 15%
George Lu Planning and Transportation
Commission
1 15 6%
Giselle Roohparvar Planning and Transportation
Commission
3 4 75%
Keith Reckdahl Planning and Transportation
Commission
6 19 31%
Doria Summa Planning and Transportation
Commission
0 19
Carolyn Templeton Planning and Transportation
Commission
2 19 10%
Item 15
Item 15 Supplemental
Report

Item 15: Staff Report
Pg.
5 Packet Pg. 226 of 227

Name Boards, Commissions, and
Committees
Absent Total BCC
Meetings
%
(limit 33%)
Loren Gordon Public Art Commission 3 10 30%
Ben Miyaji Public Art Commission 0 10
Hsinya Shen Public Art Commission 1 10 10%
Nia Taylor Public Art Commission 2 10 20%
Lisa Waltuch Public Art Commission 1 10 10%

David Bower Storm Water Management
Oversight Committee
1 3 33%
Marilyn Keller Storm Water Management
Oversight Committee
0 3
Kevin Mayer Storm Water Management
Oversight Committee
0 3
Dena Mossar Storm Water Management
Oversight Committee
0 3
Ron Owes Storm Water Management
Oversight Committee
0 3
Catherine Perman Storm Water Management
Oversight Committee
0 3
Bob Wenzlau Storm Water Management
Oversight Committee
0 3

Rachel Croft Utilities Advisory Commission 0 8
Meagan Mauter Utilities Advisory Commission 1 7 14%
Phil Metz Utilities Advisory Commission 1 10 10%
Robert Phillips Utilities Advisory Commission 0 8
Lauren Segal Utilities Advisory Commission 1 10 10%
Greg Scharff Utilities Advisory Commission 2 10 20%
Lisa Forrsell Utilities Advisory Commission 0 10

APPROVED BY:

Mahealani Ah Yun, City Clerk
Item 15
Item 15 Supplemental
Report

Item 15: Staff Report