Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
B.1.1 Implement and periodically amend an Economic Development Policy to guide business development in the City in a manner consistent with Policy L‐1.10.

Planning and
Development Services &
City Manager's Office
Continuous Task Standard Ongoing
The City continues to monitor the office / Research & Development growth. In 2024, there was a net gain of 2600 sq. ft. of office/R&D as of September 2024. The 2023 Staff Comment was provided as a mid‐year update in 2023 ‐ by the end of the 2023 calendar year there was a net gain of 93,920 sq. ft office / R&D.

B3.2.1
Continue to refine tools, such as the Business Registry, as data sources on existing businesses, including the type of business, number of employees, size, location, and other metrics to track the diversity of Palo Alto businesses.

Administrative Services
Department Continuous Task Significant Ongoing
The new business tax program has launched and both the business tax and business registry processes are active resulting in existing and new businesses providing updated information to the City annually along with fees either quarterly for the tax or annually for the registration.

B4.2.1 Revise zoning and other regulations as needed to encourage the preservation of space to accommodate small businesses, start‐ups and other services.

Planning and
Development Services 2022‐2027 Significant Pending Work  has not commenced.

B4.2.2
Consider planning, regulatory, or other incentives to encourage property owners to include smaller office spaces in their buildings to serve small businesses, non‐ profit organizations, and independent professionals.

Planning and
Development Services 2022‐2027 Standard Pending Work  has not commenced.

B4.6.1 Work with local merchants to encourage Palo Alto residents, workers, and visitors to buy in Palo Alto.

Planning and
Development Services &
City Manager's Office
Continuous Task Standard Ongoing
The City continues to encourage Palo Alto residents, workers, and visitors to buy in Palo Alto through its Uplift Local campaign and opportunities for businesses to cross‐promote with City events.

B4.6.2 Study the overall viability of ground‐floor retail requirements in preserving retail space and creating an active street environment, including the types of locations where such requirements are most effective.

Planning and
Development Services 2022‐2027 N/A Complete The reports were presented to the PTC in 2024. Council reviewed the report per PTC and Council Retail Ad Hoc and directed staff to proceed with recommendations.

B4.6.3 Maintain distinct neighborhood shopping areas that are attractive, accessible, and convenient to nearby residents.

Planning and
Development Services Continuous Task Standard Ongoing This  is an ongoing effort.

B5.1.1 Regularly evaluate ways to improve coordination of the City’s environmental review, permitting, and inspection processes.

Planning and
Development Services Continuous Task Standard Ongoing This  is an ongoing effort.

B5.1.2 Improve design guidelines to reduce ambiguity and more clearly articulate compatibility principles to the business community and to the public.

Planning and
Development Services 2022‐2027 Significant Partially  Complete Objective Design Standards for housing development projects and for single‐family homes were approved in 2022.  Ongoing improvements will be made as needed. SOFA CAP zone regulations will be updated in 2026 to include objective design standards.

B5.1.3 Simplify the design review process for small‐scale changes to previously approved site plans and buildings. Planning and Development Services 2022‐2027 Significant Ongoing
Staff is processing more Architectural Review applications over the counter including sign applications.  These procedures were last updated in February 2024 to add additional items that can be processed OTC.

B5.1.4
Revise zoning and other regulations as needed to encourage the revitalization of aging retail structures and areas. Encourage the preservation of space to accommodate small, independent retail businesses and professional services.

Planning and
Development Services Continuous Task Significant Partially  Complete Retail study was completed in 2024 and shared with the Retail Ad Hoc and Council. Council reviewed the report and adopted an interim ordinance in December 2024 with direction to staff to proceed with work on a permanent ordinance in 2025.

B6.1.1 Actively work with Downtown businesses, professional associations and the Palo Alto Chamber of Commerce to retain successful retail businesses that contribute to the City’s goals for Downtown.

Planning and
Development Services &
City Manager's Office
Continuous Task Standard Ongoing
City Council approved City's Economic Development strategy in 2023. To progress on that strategy, the City continues collaborating with various stakeholders, including the Chamber of Commerce, University Avenue Downtown Businesses, California Avenue businesses, hoteliers, Stanford, and others to promote a strong business climate. Focused business support through programs like Uplift Local, public art installations, holiday events, and other ways to activate spaces will continue.

Goal B‐1: Businesses in Palo Alto that contribute to economic vitality, enhance the city’s physical environment, promote municipal revenues and provide needed local services.

Attachment A: Comprehensive Plan Implementation Program Status, 2024 Business & Economics Element
Goal B‐3: Careful management of City revenues and expenditures so that the fiscal health of the City is ensured and services are delivered efficiently and equitably.

Goal B‐4: The stimulation of diverse commercial, retail and professional service business opportunities through supportive business policies and a culture of innovation.

Goal B‐6: Attractive, vibrant retail centers, each with a mix of uses and a distinctive character.

Goal B‐7: Thriving business employment districts at Stanford Research Park, Stanford Medical Center, East Bayshore/San Antonio Road Area and Bayshore Corridor that complement the City’s business and neighborhood centers.

Goal B‐5: City regulations and operating procedures that provide certainty, predictability and flexibility and help businesses adapt to changing market conditions.

Page 1 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
B7.2.1
Review policies and regulations guiding development at Stanford Research Park and revise them as needed to allow improved responsiveness to changing market conditions in a manner consistent with Policy L‐1.10.

Planning and
Development Services 2022‐2027 Significant Ongoing
The City Council adopted the Housing Element in May 2023 and adopted a revised Housing Element in April 2024 which was certified by the State in August 2024. Staff meets regularly with Stanford University regarding land use on an ongoing basis.

B7.2.2
Study the feasibility of a “transfer of development rights” (TDR) program and other measures that would provide greater development flexibility within Stanford Research Park without creating significant adverse traffic impacts or increasing the allowable floor area.

Planning and
Development Services 2022‐2027 Significant Pending Work  has not commenced.

C.1.15.3 Collaborate with Palo Alto Community Child Care (PACCC) to identify, develop, and promote high quality early learning environments to serve all families in our community.

Community Services
Department Continuous Task Standard Ongoing
No change from previous year reporting. City staff continues to work collaboratively with Palo Alto Community Child Care (PACCC) by managing service contracts with them in order to provide the best care possible.

C.1.17.2 Develop programs and activities for teens that strengthen leadership skills, encourage a culture of community service, inclusiveness, tolerance and acceptance of others.

Community Services
Department Continuous Task Standard   Ongoing
The City supports Teen Leadership Groups, including the Art Center Teen Leadership Group (ACTL), Palo Alto Youth Council (PAYC), Teen Advisory Board (TAB), Teen Library Advisory Board (TLAB) and Teen Arts Council (TAC), as well as overseeing Think Fund, a supportive grant program for teens, and the makerspace, MakeX. The teen leadership groups give high school students in Palo Alto the opportunity to serve the teen community by acting as a voice toward action and change. The Teen Center at Mitchell Park Community Center is open for middle school students Monday – Friday from 3pm‐6pm, and now provides activities every Friday night for high School students from 6pm‐8pm. The Art Center continues to provide creative opportunities for teens through expanded teen classroom assistants and a larger, more engaged Art Center Teen Leadership (ACTL) group. In the past year, ACTL had 29 members. Participants were primarily from the Palo Alto schools, and attended artist talks and workshops, made holiday cards for Avenidas clients, organized and held a Teen Event with 75 teens in attendance, and exhibited their art at the Art Center. The City also continues to partner with local organizations support youth suicide prevention and mental health awareness through community education, outreach, and training; access to quality youth mental health services; and policy advocacy. The City also funds Youth Community Service's Connectedness Initiative.

C.1.18.2
Support, promote, and publicize the provision of comprehensive senior services in coordination with senior service providers. Comprehensive services include addressing senior nutrition, mental health and transportation.

Community Services
Department Continuous Task Standard   Ongoing
City continues to support Avenidas for a wide array of senior programming/services, La Comida for senior nutrition needs, and Senior Adult Legal Assistance for free legal services for seniors.

C.1.18.3
Establish a support program for caregivers of seniors and people with disabilities by partnering with private, nonprofit, faith‐based and public community service organizations.

Community Services
Department 2022‐2027 Standard Ongoing This work is part of Avenidas contracted scope of services.  The City has an agreement with Magical Bridge Foundation to programs for people with disabilities.

C.1.2.2 Explore a City solution to help residents and others to resolve questions and concerns and navigate the City’s community services and facilities.

Community Services
Department 2022‐2027 Significant Ongoing No  Change from Previous Year C1.1.1 Based on identified needs, continue to provide and expand the provision of multilingual literature, program information and educational displays at public community facilities and parks.

Community Services
Department Continuous Task Standard Ongoing   No change from Previous year Goal C‐1: Deliver community services effectively and efficiently.

Community Services & Facilities Element

Page 2 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
C1.1.2 Establish a cross‐cultural outreach program to engage residents of all ages, cultural, social and linguistic backgrounds in educational, recreational and cultural activities offered throughout the City of Palo Alto.

Community Services
Department 2022‐2027 Significant   Ongoing
The Palo Alto Art Center free‐admission exhibitions continue to showcase diverse cultural themes through art, engaging more than 20,000 diverse community members last fiscal year. In FY24, the Art Center presented the exhibition Boom Oaxaca, which celebrated the cultural traditions of Palo Alto’s sister city Oaxaca, Mexico. In Feast or Famine and What’s Cooking’? celebrated food traditions from countries as diverse as China, Vietnam, Mexico, and India, highlighting how food connects us to our identity and each other. With the support of the Friends of the Palo Alto Children’s Theatre, the Children’s Theatre commissioned new theatrical works supported by community collaborations and cross‐ cultural exchanges. In FY24, the Children’s Theatre produced an adaptation of The Velveteen Rabbit, in a version of the classic tale that featured all non‐binary roles, and aimed at teaching children about both having compassion for those who are different and coping with loss. Following The Velveteen Rabbit, The Children’s Theatre collaborated with local schools as well as the Palo Alto Junior Museum and Zoo to produce the world premiere of Meerkats – the Musical, a new play that combined science learning and art.

C1.12.1 In cooperation with public and private businesses, non‐ profit organizations, and PAUSD, develop a service program that will coordinate the efforts of agencies providing services to families and youth in Palo Alto.

Community Services
Department Continuous Task Significant   Ongoing  This is an ongoing task.

C1.13.1
Determine the potential for City shared use of PAUSD facilities for weekend, summer and evening use for community uses such as child care, libraries, recreational facilities, community meeting space, education, language education, health care, culture and computer resources.

Community Services
Department 2022‐2027 Significant Pending This  is an ongoing task.

C1.15.1 Support and promote the provision of comprehensive child care services in Palo Alto by public and private providers, including employers.

Community Services
Department By 2022 Standard Ongoing   City staff and the Early Care and Education Committee continue to work to support child care providers in the community.

C1.15.2
Utilize the Early Care and Education Committee to develop and update the Child Care Master Plan, and to connect providers and professionals working with families with young children, explore challenges and opportunities to programs and services for young children, and support early education programs in the community in their efforts to enhance quality.

Community Services
Department By 2022 Standard Ongoing
Staff requested an allocation from the Child Care Trust Fund from Council in December of 2024  to re‐establish the Child Care Mini Grant Program. This program will provide small grants to support professional development opportunities for providers and the provision of professional services to assist them in addressing the specialized needs of children in their programs.

C1.15.4 Explore opportunities to provide access to childcare for families of City employees. Community Services Department After 2027 Standard Ongoing This  program is in place and ongoing.

C1.16.1 Identify funding sources for expanded outreach and increased involvement to support youth and teen leadership programs and events.

Community Services
Department 2022‐2027 Standard Ongoing
This is an ongoing effort and the Community Services Department's nonprofit partners provide some support for these programs. The City Council approved funding for youth mental health support in the FY25 budget to help support these programs.

C1.16.2 Leverage available funding to pursue support of teen mental, physical, social and emotional health programs.

Community Services
Department Continuous Task Standard Ongoing
The City continues to support Project Safety Net, now a 501(c)(3) and Youth Community Service, to support teen mental health programs. The Human Services Resource Allocation Process (HSRAP) has historically funded several organizations focusing on teen health. The City also funds Youth Community Service's Youth Connectedness Initiative. The City Council provided funding in FY25 in support of youth mental health.

C1.17.1 Optimize participation in such programs by increasing the number of locations where the programs are provided and by supporting transportation options to these locations.

Community Services
Department By 2022 Standard Ongoing   Free Link rides are available to teens seeking to access places that support their mental health.

Page 3 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
C1.17.3 Promote a diverse range of interests and vocations among programs offered to children, youth and teens. Community Services Department 2022‐2027 Standard Ongoing
In FY24, the Art Center engaged 2,305 children and youth in after‐school and weekend classes throughout the school year and in eight weeks of summer camps focused on drawing, painting, comics, ceramics, fashion design, jewelry and more. The Art Center continues to provide creative opportunities for teens through expanded teen classroom assistants and a larger, more engaged Art Center Teen Leadership (ACTL) group. In the past year, ACTL had 29 members. Participants were primarily from the Palo Alto schools, and attended artist talks and workshops, made holiday cards for Avenidas clients, organized and held a Teen Event with 75 teens in attendance, and exhibited their art at the Art Center. A value of more than $320,000! The Art Center’s summer intern program continues to provide meaningful work experience in the arts for diverse teens from around the country. Last year, diverse undergraduate interns and graduate fellows were from University of San Francisco, Museum Studies Masters Program; UC Riverside, George Washington University, University of Washington, Syracuse, Barnard, and the University of Miami. In FY24, the Children’s Theatre worked with the Friends of Palo Alto Children’s Theatre to provide more than $20,000 in paid internships to 53 teens, who were able gain hands on teaching and mentorship opportunities in both production and theatre classroom settings. In 2023 the Palo Alto Junior Museum established an internship position in the Zoo as a way of engaging youth from local low‐income neighborhoods that are interested in pursuing a carrier in the zoo and aquarium fields. This year staff is working with education nonprofits in East Palo Alto to recruit high‐school or college age youth for the position.

C1.18.1 Develop a program to engage the talents and skills that seniors possess that would provide volunteer opportunities throughout the City.

Community Services
Department Continuous Task Standard Ongoing
The Palo Alto Art Center engages seniors through our adult studio program (approximately 18% of adult studio class takers identify as 65 years or older), through our volunteer program (in FY24, approximately 400 active volunteers contributed more than 10,000 hours), and our outreach program funded by the Palo Alto Art Center that provides free art making opportunities to low‐income senior communities in Palo Alto.

C1.2.1 Periodically review public information, outreach and community relations activities to evaluate effectiveness.

Community Services
Department Continuous Task Standard Ongoing   No change from previous year reporting. This is an ongoing task.

Page 4 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
C1.2.3
Identify barriers to participation in City programming and facilities across gender, age, socioeconomic and ethnic groups and sexual identity and orientation, as well as mental and physical abilities, and adopt strategies to remove barriers to participation.

Community Services
Department By 2022 Significant Ongoing
In FY24, the Art Center offered free use of Aira, an on‐demand app for use by people with vision impairment for live visual descriptions. The Art Center also purchased and promoted its accessible artmaking equipment, including an accessible potters’ wheel and easels.

Accessibility offerings are outlined on the Art Center’s access webpage, and also include social narratives for visiting our galleries and taking classes in our studios. Thanks to support from the Palo Alto Art Center Foundation, the Art Center can offer scholarships to East Palo Alto youth and low‐income seniors to reduce barriers to access classes and workshops. Community Services also continues to partner with Magical Bridge Foundation to offer inclusive programming for all‐abilities. Community Services also received approval to hire a .75 FTE Therapeutic Recreation Coordinator to provide access and inclusion support to the Department. In FY24, as part of the Children's Theatre's Magical Series Spectrum and Sensory Friendly offerings, developed in collaboration with the Magical Bridge Foundation, the Children’s Theatre offered Magical Series Sensory and Spectrum Friendly performances and classes, including acting, dance and music therapy offerings designed for differently abled participants. The Children’s Theatre Main Stage and Summer Hot Dog Series offered ASL designated performances, as well as a “Read‐Along” option for audiences, available at all performances. The Children’s Theatre also worked with PAUSD to offer free theatre classes in summer camps designed to serve to low‐income and traditionally under‐represented communities, as well as working in partnership with the Magical Bridge Foundation to provide free theatre and music classes in the “Magical Day Program,” a camp that serves participants with special needs who have aged out of traditional education programs.

C1.2.4 Based on identified needs, expand program offerings to underserved groups. Community Services Department Continuous Task Substantial Ongoing
The Palo Alto Art Center Foundation provides vital support to the Art Center to reach underserved communities. Thanks to the Foundation, Cultural Kaleidoscope, our artists‐in‐ the‐schools program, was offered free‐of‐charge in 34 Palo Alto and East Palo Alto classrooms to 816 students, fostering classroom learning through the arts in FY24. Thanks to the generosity of the Palo Alto Art Center Foundation, 22 scholarship Project Look school tours were provided, with bussing to East Palo Alto schools, allowing the participation of more than 500 students. In FY24, the Children’s Theatre worked with the Friends of Palo Alto Childrens Theatre to provide more than $20,000 in theatre field trip transportation grants to Title‐1 schools, as well as class and camp scholarships to low‐ income families. In FY24, Palo Alto Children’s Theatre continued to support the development of the Reparations Project, a national collaboration with The Breath Project and the Friends of Palo Alto Children’s Theatre, to encourage conversations around the topic of slavery reparations in educational and performing arts institutions, and was part of the Black Experience Festival in Mountain View, California. In addition to the Reparations Project, the theatre participated in a production about housing insecurity for the Black Experience Festival, and paid internships for Palo Alto teens were included in both projects. With funding from the Friends of the Junior Museum & Zoo the JMZ provided 22 scholarships to low income students to come to JMZ week‐long camps  and one Summer Camp Assistant position. 113 after school programs (Science with a Twist) in East Palo Alto schools,  433 programs in five 5 Boys and Girls Clubs,  5 field trips to Palo Alto Open Space Preserves, and four field trips to the JMZ.  With funding from Santa Clara County the JMZ provided 73 program for Title 1 schools in the county  plus 14 field trips to Open Space Preserves with transportation, and One class’s field trip to the JMZ. With funding from First 5 Santa Clara the JMZ provided 65 “Mommy and Me” preschool programs in five family resource centers.

C1.20.1 Partner with agencies for support and improved access so that all can participate as appropriate in Palo Alto recreational programs.

Community Services
Department Continuous Task Standard Ongoing   Council approved funding for Magical Bridge Foundation to provide more programming in the community.

Page 5 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
C1.22.1
Increase awareness about caring and compassion for the unhoused and those who suffer from mental and/or physical conditions through educational programming in partnership with community and business organizations throughout the region.

Community Services
Department Continuous Task Standard Ongoing
Staff is leading an effort to count unhoused members of the community for the Bienniel Point in Time Count, a national effort that requests that each community count and/or interview their unsheltered homeleess population. This is being done with the assistance of local serivces providers and community volunteers.

C1.22.2
Work with Santa Clara and San Mateo Counties, the State of California, the federal government, non‐ profit agencies, business and other organizations to define roles and responsibilities in the comprehensive provision of permanent supportive housing and temporary shelter, food, clothing and transportation for those in need.

Planning and
Development Services /
CMO
Continuous Task Standard Ongoing
This is an ongoing task. The City continues to be involved local, regional, State and federal partners in this work. This fall, the City joined a new intercity unhoused response collaborative launched by Mountain View, to bring together cities to share information, partner and learn from one another.

C1.3.1 Develop and implement a plan to collect and analyze data on demographics, use of community service facilities and needs of the community as related to parks, open spaces, recreation, arts and culture.

Community Services
Department 2022‐2027 Standard Ongoing
No change from previous year reporting. This is an ongoing task. Community Services Department’s program areas regularly collect and review demographic information from program participants. The Parks, Trails, Open Space and Recreation Master Plan contains information on community needs.

C1.6.1 Establish a program to facilitate continuing corporate support for community services through contributions of funds, time, materials and expertise.

Community Services
Department 2022‐2027 Significant   Pending No change from previous year reporting. A formal program to facilitate corporate support has not been established.  Corporate sponsorships for special events have been received.

C2.2.1 Establish performance review criteria for City employees that consider the quality of service provided. Human Resources Department 2022‐2027 Standard Partially  Complete No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

C2.2.2 Periodically perform evaluations of City service delivery and develop strategies for continuous improvement. Use metrics and make information publicly available.

Community Services
Department Continuous Task Standard Ongoing   No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

C3.2.1 Develop a proactive Asset Management Program for infrastructure requirements and costs.

Administrative Services
Department/

OMB/PWD
2022‐2027 Significant Ongoing
The Citywide Facility Condition Assessment (FCA) and Electrification Assessment (EA) inspections  have been completed. The data from the findings is being populated into Maintenance Connection. This data will allow staff to track and plan for deferred maintenance (catch‐up), regular maintenance (keep‐up), ADA Accessibility, Capital Renewals (New) and Energy and Sustainability (electrification) for future CIP projects and budgeting.

C3.3.1 Periodically evaluate how parks and recreational facilities are being used and develop strategies for improving their use overall.

Community Services
Department Continuous Task Standard Ongoing   This is an ongoing effort. Staff regularly analyze programs and solicit feedback from program participants to improve programs and provide desired amenities.

C3.3.2 Study and recommend methods of private and public financing for improved park maintenance, rehabilitation, and construction of facilities, including those used for arts and culture.

Community Services
Department By 2022 Standard Ongoing Staff continue to partner with stakeholders to design and fundraise for a new and improved Greer skate park.

C3.3.3
Estimate the costs of retrofitting all park facilities with water efficient appliances, fixtures and irrigation systems and develop an implementation schedule to phase‐in use of non‐potable water conservations measures where and when feasible.

Public Works
Department and
Community Services
Department
After 2027 Significant Ongoing
Staff continues to review all park facilities and determine where to upgrade systems to increase water efficiency.  This includes appliances, fixtures, and irrigation systems. Once evaluated, staff will develop an implementation schedule. Non‐potable water conservations measures will be included where and when feasible.

C3.3.4 Periodically assess the need to adjust parkland dedication or fees in lieu thereof to ensure they remain proportional to real estate values in Palo Alto.

Planning and
Development Services
and Community
Continuous Task Significant Partially  complete New fees were adopted but there are follow up items with the Planning and Development Services Department.

C4.1.1 Explore opportunities to dedicate City‐owned land as parkland to protect and preserve its community‐ serving purpose into the future.

Community Services
Department By 2022 Standard Ongoing Staff continue to review current parklands and determine which may be appropriate for future dedication.

C4.1.2 Encourage dedication of new land for parks through regulations and incentives for new development and programs to solicit bequests of land within the city.

Community Services
Department and
Planning and
2022‐2027 Significant   Pending This  work has not been started due to staff priorities.

C4.1.3 Pursue opportunities to create linear parks over the Caltrain tracks in the event the tracks are moved below grade.

Community Services
Department and
Planning and
After 2027 Substantial Pending The  Caltrain tracks have not been moved underground.

Goal C‐2: Demonstrate a commitment to excellence and high quality service to the public among City of Palo Alto officials and employees.

Goal C‐3: Recognize the intrinsic value and everyday importance of our parks and community centers, libraries, civic buildings and cultural assets by investing in their maintenance and improvement.

Goal C‐4: Plan for a future in which our parks, open spaces, libraries, public art, and community facilities thrive and adapt to the growth and change of Palo Alto.

Page 6 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
C4.1.4 Explore ways to dedicate a portion of in‐lieu fees towards acquisition of parkland, not just improvements.

Community Services
Department and
Planning and
2022‐2027 Significant Pending This  work has not been started due to staff priorities.

C4.5.1 Use Cubberley Community Center as a critical and vital part of the City’s service delivery system while also planning for its future.

Community Services
Department Continuous Task Substantial Ongoing   Progress has been made on negotiating a purchase of a portion of Cubberley. The master planning effort will be re‐initiated in January 2025.

C5.1.1 Allocate resources to create and support initiatives to increase the health and well‐being of the public. Community Services Department Continuous Task Standard Ongoing
In the FY24 budget process, the Council allocated an additional $200k for Human Resource Allocation Process grants, which provide grants to local non‐profits that support health and well‐being to vulnerable members of the community. In general, nearly all of CSD's programs and services support the well‐being of the public.

C5.1.2 Establish a community‐sourced online clearinghouse of information and activities related to health promotion in the community.

Community Services
Department Continuous Task Standard Ongoing   Community resources related to health and wellness have been provided through the City Manager’s Office as part of Uplift Local and communication and on the City's website.

C5.6.1 Incorporate health and well‐being topics, including arts and culture, into existing events and programs at City‐ owned park and recreation facilities.

Community Services
Department Continuous Task Standard Ongoing
In FY24, the Art Center continued to distribute its Social and Emotional Toolkit to community members throughout the City. The Art Center also continues to provide free artmaking experiences to a variety of city and community events, including the May Fete celebration, and Chili Cook Off. Free Family Days throughout the year at the Art Center draw hundreds of participants. The Teen Center has incorporated wellness topics and activities.

C5.6.2 Work with schools and community organizations to provide programs that educate residents, workers and visitors on health and well‐being topics.

Community Services
Department Continuous Task Significant   Ongoing
In FY24, the Children’s Theatre continued to serve all PAUSD K‐2 Elementary School students with a Dance in Schools program, an 8‐week onsite get‐up‐and‐move curriculum that promotes physical fitness and positive self‐esteem.

C5.9.1 Identify existing and potential indoor and outdoor locations for community gardens and farmers markets at City‐owned or leased facilities and spaces.

Community Services
Department 2022‐2027 Significant Ongoing
This is an ongoing effort. The Community Services Department continues to manage the City's community garden program. There are currently five community gardens in the program ‐ Arastradero Garden is currently a leased/partnership site with the owner.

G1.1.1 Consider making data available at a transactional level on the Open Data Portal. Planning and Development Services Continuous Task Standard Ongoing This  is an ongoing effort.

G1.2.1 Continue to hold regular, Town Hall‐style meetings in neighborhoods. City Council & City Clerk’s Office Continuous Task Standard Ongoing
Staff has implemented quarterly neighborhood town hall meetings in partnership with neighborhood groups.  All meeting materials are available online at www.cityofpaloalto.org/engage. There are also other topic‐specific community engagement meetings that occur throughout the year.

G1.2.2 Periodically review the suite of engagement options used to solicit citizen input and expertise on policy issues. City Manager’s Office Continuous  Task Significant Ongoing Staff presented community engagement activities as part of the adoption of the 2024 Council Priorities/Work Plans. Staff presented a series of community engagement approaches and gained input on the City's overall approach. Several efforts are underway including hosting one Neighborhood Town Hall in each quarter of the calendar year.

Council also receives a quarterly update on work completed.

G1.2.3
Continue to rely on neighborhood organizations, the City website, local media, online technologies and other communication platforms to keep residents informed of current issues and to encourage citizen engagement.

City Manager’s Office Continuous  Task Standard Ongoing This  is an ongoing task and staff continues to implement this goal.

Governance Chapter
Goal G‐1: Effective opportunities for public participation in local government.

Goal C‐5: Sustain the health, well‐being, recreation, and safety of residents and visitors, and improve the quality, quantity, and affordability of social services for all community members, including children, youth, teens, seniors, the unhoused, and people with disabilities.

Page 7 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
G1.2.4 Provide access to communications technologies at City facilities, including public libraries and City Hall, and explore innovative locations for communication. City Manager’s Office Continuous  Task Significant Ongoing A virtual receptionist in the City Hall Lobby assists the public with their service needs and this continues to be available, in addition to service assistance at the Revenue Collections and Utilities service counters. In terms of other communications focus areas, staff manages an interactive platform that shares information with the public and also supports new ways to engage the community on topic specific efforts including Fiber and Sustainability. Staff continues using the lobby screens to share City information, implemented a process to distribute printed materials to City facilities for public information, mailed postcards to residents informing them of the Neighborhood Town Halls, and during the storm season in addition to all digital ways to share information, staff recorded updates on the City’s public information line to share storm impacts and updates.

Staff hosted a City Hall Open House and staff is currently recruiting for a information service staff member to connect community members at City Hall with information and services.

G1.2.5 Continue to release City Council staff reports to the public up to 10 days prior to Council hearings to increase public awareness of City decision‐making. City Clerk’s Office Continuous  Task Standard ongoing We continue to release City Council staff reports up to 10 days prior to City Council meetings, with the exception of amended agenda items which are provided on the Thursdays before the meeting (latest).

G2.2.1
Continue to offer the use of City facilities to non‐profit civic, environmental, cultural, neighborhood and social service organizations for meetings and events at discounted or complimentary rates and via sponsorship programs.

City Manager’s Office Continuous  Task Standard Ongoing This  is an ongoing effort.

G4.1.1 Continue and expand volunteer opportunities and the community’s awareness of public and nonprofit organizations serving the City. City Manager's Office Continuous  Task Standard Ongoing The City continues to collaborate with established Advisory Groups to enhance policy development and foster information sharing. To promote transparency in nonprofit funding, the City will now regularly report on available funding opportunities as well as the nonprofits awarded service and lease contracts. Additionally, the City will strengthen communication channels with nonprofit partners who hold active contracts, helping to amplify their services to the broader community.

G4.1.2 Publicly recognize the efforts of individuals, groups, and businesses that provide volunteer services within the City. City Manager’s Office Continuous  Task Standard Ongoing The City continues to collaborate with established Advisory Groups to enhance policy development and foster information sharing. To promote transparency in nonprofit funding, the City will now regularly report on available funding opportunities as well as the nonprofits awarded service and lease contracts. Additionally, the City will strengthen communication channels with nonprofit partners who hold active contracts, helping to amplify their services to the broader community.

G4.1.3 Coordinate with the Palo Alto Unified School District to develop classroom‐based leadership, governance and civic participation programs. City Manager’s Office 2022 ‐2027 Significant Ongoing This is an ongoing task. The City regularly meets with PAUSD leadership and discusses recent issues of interest to both organizations.

G4.1.4 Support the transition from school‐based volunteering to civic participation via outreach to parent volunteers and student leaders.

City Manager’s Office
and Community
Services Department
2022‐2027 Standard Ongoing This  is an ongoing task.

G4.1.5 Coordinate with the real estate community to develop a welcome package for new residents, containing City resources, information and ways to contribute to livability. City Manager’s Office 2022 ‐2027 Significant Partially  complete No change from last year's reporting. Staff continues to send a digital welcome message to new residents and finalized a new welcome message that is both digital and in print formats. The City's website, provides  a comprehensive look at resident related information. The website includes a digital welcome packet and new resident resources are now available both at www.cityofpaloalto.org/residents and a new "My Neighborhood" map that highlights services available near a resident's home at www.cityofpaloalto.org/residents/my‐neighborhood
Goal G‐2: Informed and involved civic, cultural, environmental, social service and neighborhood organizations and residents.

Goal G‐4: Active involvement of local citizens as volunteers.

Page 8 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
G6.2.1 Provide clear information across multiple communications platforms to guide citizens and businesses through the City review and approval process.

Planning and
Development Services Continuous Task Standard Ongoing This is an ongoing effort. Development project submittal checklists are being updated on a regular basis on the City's webpage.

G6.2.2 Continue and expand customer‐oriented process improvement efforts. All  Departments Continuous  Task Standard Ongoing Continuous improvements to the Online Permitting System (OPS) including:
‐Launched a pilot program for over the counter residenƟal MEP (mechanical, electrical, plumbing) permits
‐Integrated online building permit applicaƟon form to the online permiƫng process ‐Launched instant permits for kitchen/bath remodel applicaƟons ‐Launched staff‐level pilot program an ArƟficial Intelligence (AI) firm to analyze AI capabilities in the plan review process
‐Published building permit checklists for more complete applicaƟons (reducing the iniƟal back and forth between staff and the applicant)
G6.2.3 Use the pre‐screening process to obtain early feedback from the City Council and the community regarding ordinance changes intended to facilitate specific development proposals.

Planning and
Development Services Continuous Task N/A Complete This  is required by PAMC Title 18 Chapter 18.79.

L1.6.1
Review regulatory tools available to the City and identify actions to enhance and preserve the livability of residential neighborhoods and the vitality of commercial and employment districts, including improved code enforcement practices.

Planning and
Development Services By 2022 Standard Ongoing
The code enforcement team as completed its initial goal to enhance the gas leaf blower program by adopting the ordinance in June of 2023.  Moving forward, the code enforcement has and will continue to proactive patrol neighborhoods, respond to complaints and utilize  established tools to accomplish the goal of bringing forth compliance with banning the use of gas leaf blowers.

L1.8.1
Maintain and update as appropriate the 1985 Land Use Policies Agreement that sets forth the land use policies of the City, Santa Clara County, and Stanford University with regard to Stanford unincorporated lands.

Planning and
Development Services Continuous Task Standard   Ongoing An update to the Stanford University Community Plan was adopted in October 2023.

However, the plan didn't change the 1985 land use policies agreement/protocol.

L2.2.1 Explore whether there are appropriate locations to allow small‐scale neighborhood‐serving retail facilities such as coffee shops and corner stores in residential areas.

Planning and
Development Services 2022‐2027 Standard Ongoing Staff continues to promote neighborhood‐serving retail as part of both current planning and long‐range planning projects.

L2.4.1 Amend the Housing Element to increase housing sites along San Antonio Road between Middlefield Road and East Charleston Road and increase residential densities in Downtown and the California Avenue.

Planning and
Development Services By 2022 N/A Complete
L2.4.2 Allow housing at Stanford Shopping Center, provided that adequate parking and vibrant retail is maintained and no reduction of retail square footage results from the new housing.

Planning and
Development Services By 2022 Standard Partially  Complete As part of the Housing Element update, a proposed program is included to engage in discussions with Stanford Shopping Center in preparation for the next Housing Element Cycle in 2031. See Program 1.5 in the adopted 2023‐2031 Housing Element. The outreach and engagement hasn't begun yet. Staff will meet with representatives of the Stanford Shopping Center in Q2 2025.

L2.4.3 Allow housing on the El Camino Real frontage of the Stanford Research Park. Explore multi‐family housing elsewhere in Stanford Research Park and near the SUMC.

Planning and
Development Services By 2022 standard partially  complete Stanford owned parcels along El Camino Real have been included in the housing sites inventory. Staff continues to explore possibilities of multi family housing in Research Park area with the ordinance to amend Conditional Use Permit (CUP) on Residential use in the Research Park Zone except for properties subject to or impacted by the City’s hazardous materials ordinance‐ see Program 1.5 in the adopted 2023‐2031 Housing Element. The Council will review the ordinance changes in January 2025.

Goal G‐6: More clearly defined procedures, standards, and expectations for development review.

Goal L‐1: A compact and resilient city providing residents and visitors with attractive neighborhoods, work places, shopping districts, public facilities, and open Goal L‐2: An enhanced sense of “community” with development designed to foster public life, meet citywide needs and embrace the principles of sustainability.

Land Use and Community Design Element

Page 9 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
L2.4.4
Assess non‐residential development potential in the Community Commercial, Service Commercial and Downtown Commercial Districts (CC, CS and CD) and the Neighborhood Commercial District (CN), and convert non‐retail commercial FAR to residential FAR, where appropriate. Conversion to residential capacity should not be considered in Town and Country Village.

Planning and
Development Services By 2022 Standard Ongoing
Council continues to review Planned Home Zoning (PHZ) prescreening converting commercially used land to housing. This includes a PHZ project (70 Encina) on a Town and Country Center parking lot that is not owned by Town and Country.

L2.4.5
Update the municipal code to include zoning changes that allow a mix of retail and residential uses but no office uses. The intent of these changes would be to encourage a mix of land uses that contributes to the vitality and walkability of commercial centers and transit corridors.

Planning and
Development Services By 2022 Standard Partially  Complete Retail study was completed in 2024 and shared with the Retail Ad Hoc and Council. Council reviewed the report and adopted an interim ordinance in December 2024 with direction to staff to proceed with work on a permanent ordinance in 2025.

L2.4.6
Explore changing the Transfer of Development Rights (TDR) ordinances for both buildings of historic significance and for seismic retrofits so that transferred development rights may only be used for residential capacity.

Planning and
Development Services 2022‐2027 Standard Pending This program has not been explored yet. It may be explored as part of the Downtown Housing Plan.

L2.4.7 Explore mechanisms for increasing multi‐family housing density near multimodal transit centers. Planning and Development Services By 2022 N/A Complete
WRT was awarded the contract to work on the Downtown Housing Plan and the project is currently in its assessment phase. First Community Open House is scheduled for the 10/10/24.

L2.4.8 Identify development opportunities for BMR and more affordable market rate housing on publicly owned properties in a way that is integrated with and enhances existing neighborhoods.

Planning and
Development Services By 2022 N/A Complete
L2.5.1 Collaborate with PAUSD in exploring opportunities to build housing that is affordable to school district employees.

Planning and
Development Services Continuous Task standard ongoing In  2024, no new housing opportunities were identified.

L2.7.1 Review development standards to discourage the net loss of housing units. Planning and Development Services By 2022 N/A Complete
L2.8.1 Conduct a study to evaluate various possible tools for preventing displacement of existing residents. Planning and Development Services 2022‐2027 Significant Partially  Complete In 2024, the City launched its new rental registry program to collect data on the current rental market landscape and to inform future housing policies. Staff also brought a Fair Chance Housing policy discussion to the Housing ad hoc committee, the HRC and City Council. Staff also brought an anti rent gouging policy discussion to the housing ad hoc committee. Further, the City has contracted with Project Sentinel to provide Fair Housing and Mediation services.

L2.8.2 Develop and implement a system to inventory the characteristics of existing housing units and track changes in those characteristics on a regular basis. Make the information publicly available.

Planning and
Development Services 2022‐2027 Significant Partially  Complete The newly launched rental registry program serves to collect key housing inventory data for rental units on properties containing three or more residential rental units.

L2.10.1 Collaborate with PAUSD to plan for space to accommodate future school expansions or new school sites, and evaluate zoning space to accommodate new schools.

Planning and
Development Services Continuous Task Significant Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

L3.2.1 Evaluate and implement strategies to prevent conversion of residential and neighborhood‐serving retail space to office or short‐term vacation rentals.

Planning and
Development Services Continuous Task N/A Complete
L.3.5.1
Develop a program to assess and manage both the positive and negative impacts of basement construction in single family homes on the community and the environment, including:
‐environment, such as potential impacts to the tree canopy, groundwater supply or quality, and soil compaction.
‐Safety issues such surface flooding increased groundwater intrusion with sea level rise, emergency access and egress, or sewage backflows.

Planning and
Development Services
and Public Works
Department
By 2022 N/A Complete
Goal L‐3: Safe, attractive residential neighborhoods, each with its own distinct character and within walking distance of shopping, services, schools, and/or other public gathering places.

Goal L‐4: Inviting pedestrian scale centers that offer a variety of retail and commercial services and provide focal points and community gathering places for the city’s residential neighborhoods and employment districts.

Page 10 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
L4.2.1 Study the overall viability of ground‐floor retail requirements in preserving retail space and creating an active street environment, including the types of locations where such requirements are most effective.

Planning and
Development Services 2022‐2027 Significant Ongoing
The Planning and Transportation reviewed consultant retail recommendations on May 8, 2024 and August 14, 2024. The PTC identified near‐, mid‐ and long‐term retail zoning recommendations. The Council’s Retail Committee reviewed the recommendation on September 18, 2024. In December 2024 the Ad Hoc’s recommendation was shared with the full Council along with an interim ordinance.  Direction was given to proceed with a permanent ordinance, and include a comprehensive update to the City’s zoning code as an objective for Council consideration in 2025 work plan.

L4.2.2 Evaluate the effectiveness of formula retail limits adopted for California Avenue. Develop incentives for local small businesses where warranted.

Planning and
Development Services 2022‐2027 significant ongoing See  above. This is being evaluated as part of the citywide retail zoning strategy.

L4.2.3 Explore and potentially support new, creative and innovative retail in Palo Alto. Planning and Development Services By 2022 significant Partially  Complete Significant progress here as part of changes to retail use adopted by Council in November 2024.

L4.4.1 Study the feasibility of using public and private funds to provide and maintain landscaping and public spaces such as parks, plazas, sidewalks and public art within commercial areas.

Community Services
Department 2022‐2027 Standard Ongoing
The Public Art Program launched its fourth round of ArtLift Grants commissioning twenty Palo Alto and Bay Area artists to transform utility boxes into distinctive works of art throughout commercial corridors and residential neighborhoods of Palo Alto. Public Art also commissioned Bay Area and California‐based artists to create five site‐specific murals, including works for the Cubberley Community Center and Fire Station #4 in south Palo Alto and three murals to be painted in the downtown district. Current King Artist in Residence, whose residency project is focused on the lived experiences of the LGBTQAI+ community members in Palo Alto is developing a temporary site specific artwork to be exhibited for a period of up to a year at King Plaza in front of the Palo Alto City Hall. Additionally, six artists and artist teams will be commissioned in January 2024 to create temporary interactive media artworks for the Code:ART festival  in downtown Palo Alto scheduled to take place October 16‐18, 2025. Additional public art projects in parks and public spaces underway including Boulware Park, the exterior of Fire Station 4, and the exterior and interior of the new Public Safety Building.

L4.4.2 Through public/private cooperation, provide well‐ signed, clean, and accessible restrooms.

Planning and
Development Services
and Department of
Continuous Task Standard Ongoing This is an ongoing effort.  Planning recently approved restrooms at Rinconada, Ramos and Boulware Parks and Cubberley Fields.

L4.4.3
Collaborate with merchants to enhance the appearance of streets and sidewalks within all Centers.

Encourage the formation of business improvement districts and undertake a proactive program of maintenance, repair, landscaping and enhancement.

Department of Public
Works  Continuous Task Significant Ongoing
Public Works Department along with The City Manager's Office has started working on the University Avenue and California Avenue streetscape improvement projects to enhance economic vitality of the two streets. The goal of these projects is to reduce congestion, maximize pedestrian and bicycle use, creation of inviting outdoor dining/patio places, installing gateway and wayfinding signages, and develop branding programs, among other things.

L4.4.4
Identify priority street improvements that could make a substantial contribution to the character of Centers, such as widening sidewalks, narrowing travel lanes, creating medians, restriping to allow diagonal parking, and planting trees.

Office of Transportation By 2022 Significant Ongoing
For University Avenue Streetscape project, per Council direction in December 2023, staff and its consultants conducted additional outreach discussions and Retail Committee meetings to refine project goals, vision, and design concepts. Per Council discussion in June 2023, staff continued with further outreach to Retail Committee and Stakeholder Working group. In the next few months, staff plans to refine concepts in line with Council direction and consensus from the community to recommend a preferred concept to Council later this year.

L4.5.1 Revise zoning and other regulations as needed to encourage the preservation of space to accommodate small businesses, start‐ups and other services.

Planning and
Development Services 2022‐2027 Significant pending Work  has not commenced.

L4.5.2
Consider planning, regulatory, or other incentives to encourage property owners to include smaller office spaces in their buildings to serve small businesses, non‐profit organizations, and independent professionals.

Planning and
Development Services 2022‐2027 Standard pending Work  has not commenced.

Page 11 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
L.4.6.1 Explore increasing hotel FAR from 2.0 to 3.0 in the University Avenue/Downtown area and 2.5 in areas outside of Downtown.

Planning and
Development Services 2022‐2027 Significant Pending Work  has not commenced.

L4.8.1 Prepare a Coordinated Area Plan for Downtown. Planning and Development Services Continuous Task Significant Ongoing Project kicked‐off in March 2024 with WRT hired as the primary consultant. The project is currently in its assessment phase with project team studying the data, organizing stakeholder interviews, and recruiting members of the Community Advisory Group. The Council approved revisions to the Project Boundary on the 23rd of September 2024 to include additional sites from the Housing Element Opportunity Sites Inventory List. The first community open house to formulate the vision of the Plan is scheduled for the 10th of October 2024.

L4.8.2 Study the feasibility of converting parts of University Avenue to a pedestrian zone. Public Works,  Office of Transportation, PDS 2022‐2027 Substantial Partially  Complete No  staff comments were received related to this program's implementation in 2024.

L4.9.1 While preserving adequate parking to meet demand, identify strategies to reuse surface parking lots.

Planning and
Development Services &
Office of Transportation
Continuous Task Standard Ongoing Due to other parking program priorities, there are no substantial actions to report at this time.

L4.9.2 Explore adding additional Floor Area Ratio (FAR) for retail at Stanford Shopping Center. Planning and Development Services 2022‐2027 standard Pending Work  has not commenced.

L4.10.1
Prepare a coordinated area plan for the North Ventura area and surrounding California Avenue area. The plan should describe a vision for the future of the North Ventura area as a walkable neighborhood with multi‐ family housing, ground floor retail, a public park, creek improvements, and an interconnected street grid. It should guide the development of the California Avenue area as a well‐designed mixed use district with diverse land uses and a network of pedestrian‐oriented streets.

Planning and
Development Services Continuous Task N/A Complete Completed for the North Ventura Area (not for the area surrounding California Avenue).

NVCAP adopted by the City Council on 8/5/2024.

L4.10.2 Create regulations for the California Avenue area that encourage the retention or rehabilitation of smaller buildings to provide spaces for existing retail, particularly local, small businesses.

Planning and
Development Services 2022‐2027 significant Pending Project  commencement is pending the availability of resources.

L4.16.1 Maintain distinct neighborhood shopping areas that are attractive, accessible and convenient to nearby residents.

Planning and
Development Services Continuous Task standard ongoing This  is an ongoing task.

L5.1.1
Explore with Stanford University various development options for adding to the Stanford Research Park a diverse mix of uses, including residential, commercial hotel, conference center, commercial space for small businesses and start‐ups, retail, transit hub, and other community‐supporting services that are compatible with the existing uses, to create a vibrant innovation‐oriented community.

Planning and
Development Services 2022‐2027 standard ongoing The  City meets regularly with Stanford University regarding land use on an ongoing basis.

L6.1.1 Promote awards programs and other forms of public recognition for projects of architectural merit that contribute positively to the community.

Planning and
Development Services Continuous Task Standard Ongoing
The Architectural Review Board (ARB) awards event was conducted in September 2022 due to the pandemic. The next awards will be held in 2025.  The Historic Resources Board (HRB) is looking to start its own awards program.

L6.3.1 Develop guidelines for bird‐friendly building design that minimizes hazards for birds and reduces the potential for collisions.

Planning and
Development Services 2022‐2027 Standard Ongoing A recommendation hearing with PTC was conducted in October 2024; adoption hearing with the City Council is tentatively scheduled for early 2025 (updated Jan 2025/KC) L6.6.1
Modify design standards for mixed use projects to promote a pedestrian‐friendly relationship to the street, including elements such as screened parking or underground parking, street‐facing windows and entries, and porches, windows, bays and balconies along public ways, and landscaping, and trees along the street. Avoid blank or solid walls at street level.

Planning and
Development Services Continuous Task Standard    Ongoing Objective Design Standards were adopted by Council in June 2022 for Title 18 zoning districts. Work on SOFA standards are planned for 2025.

L6.7.1 Implement architectural standards to assure they effectively address land use transitions. Planning and Development Services Continuous Task Standard    Ongoing This is an ongoing effort. The City's Objective Design Standards provide useful guidance in the implementation of this program.

Goal L‐5: High quality employment districts, each with their own distinctive character and each contributing to the character of the city as a whole.

Goal L‐6: Well‐designed buildings that create coherent development patterns and enhance city streets and public spaces.

Page 12 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
Program for
Policy L7.2
If a proposed project would substantially affect the exterior of a potential historic resource that has not been evaluated for inclusion into the City’s Historic Resources Inventory, City staff shall consider whether it is eligible for inclusion in State or federal registers prior to the issuance of a demolition or alterations permit. Minor exterior improvements that do not affect the architectural integrity of potentially historic buildings shall be exempt from consideration. Examples of minor improvements may include repair or replacement of features in kind, or other changes that do not alter character‐defining features of the building.”
Planning and
Development Services Continuous Task Standard    Ongoing Policy L 7.2 implementation continues.  Historic Review Board (HRB) is reviewing recommendations for nominations of properties to the local inventory and to add the properties found California Register and National Register Eligible during and since the 1998‐2000 history survey, following public outreach.

L7.1.1
Update and maintain the City’s Historic Resource Inventory to include historic resources that are eligible for local, State, or federal listing. Historic resources may consist of a single building or structure or a district.

Planning and
Development Services Continuous Task Standard Ongoing Inventory update project began in 2023 with the Historic Reconnaise Survey and is expected to complete with Council's designation of some properties to the inventory.

L7.1.2 Reassess the Historic Preservation Ordinance to ensure its effectiveness in the maintenance and preservation of historic resources, particularly in the University Avenue/Downtown area.

Planning and
Development Services 2022‐2027 Significant Pending The ordinance needs to be reassessed since it does not protect properties found eligible for National and California Register. Work has not commenced on this program.

L7.8.1
Promote and expand available incentives for the retention and rehabilitation of buildings with historic merit in all zones and revise existing zoning and permit regulations to minimize constraints to adaptive reuse.

Planning and
Development Services By 2022 Significant Ongoing Staff  is looking at incentives for retention and rehabilitation when resources are identified.

L7.8.2 Create incentives to encourage salvage and reuse of discarded historic building materials.

Planning and
Development Services &
Department of Public
By 2022 Standard Ongoing The Public Works Department and Planning and Development Services Department are monitoring the deconstruction ordinance for approved demolitions.

L7.8.3 Seek additional innovative ways to apply current codes and ordinances to older buildings. Use the State Historical Building Code for designated historic buildings.

Planning and
Development Services Continuous Task Standard Ongoing Staff routinely applies the California Historical Building Code to qualified projects as applicable.

L7.12.1 Review parking exceptions for historic buildings in the Zoning Code to determine if there is an effective balance between historic preservation and meeting parking needs.

Planning and
Development Services After 2027 Significant Pending Work  has not commenced.

L9.1.1 Evaluate existing zoning code setback requirements to ensure they are appropriate for scenic routes. Planning and Development Services After 2027 Significant Pending Work  has not commenced.

L9.3.1 Review standards for streets and signage and update as needed to foster natural, tree‐lined streets with a minimum of signage.

Planning and
Development Services,
Office of Transportation
2022‐2027 Standard Ongoing This  program is ongoing. There are no updates to report at this time.

L9.6.1
Analyze existing neighborhoods and determine where publicly accessible shared, outdoor gathering spaces are below the citywide standard. Create new public spaces, including public squares, parks and informal gathering spaces in these neighborhoods.

Planning and
Development Services 2022‐2027 Substantial Partially  Complete Planning and Development Services analyzes open space opportunities as a part of its area plans. In 2024, the NVCAP was adopted and laid the groundwork for several new open spaces. It will also be considered as part of the recently launched Downtown Housing Plan and the upcoming San Antonio Area Plan.

L9.7.1
Develop a strategy to enhance gateway sites with special landscaping, art, public spaces and/or public buildings. Emphasize the creek bridges and riparian settings at the entrances to the City over Adobe Creek and San Francisquito Creek.

Planning and
Development Services Continuous Task Standard Pending Work  has not commenced.

L9.8.1 Establish incentives to encourage native trees and low water use plantings in new development throughout the city.

Planning and
Development Services,
Office of Transportation
& Department of Public
Works
2022‐2027 Standard Ongoing
Staff continues to successfully encourage the planting of native trees and low water use plantings through the use of the ARB findings modified in the 2016 code update (including a focus on regional, indigenous, drought tolerant species).  The new Tree Protection Ordinance (Title 8 of PAMC) includes added emphasis on use of native, drought tolerant and climate adapted tree species.

L9.10.1 Continue the citywide undergrounding of utility wires. Minimize the impacts of undergrounding on street tree root systems and planting areas. City of Palo Alto Utilities Continuous Task Standard Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

Goal L‐7: Conservation and preservation of Palo Alto’s historic buildings, sites, and districts.

Goal L‐9: Attractive, inviting public spaces and streets that enhance the image and character of the city.

Page 13 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
L9.10.2
Encourage the use of compact and well‐designed utility elements, such as transformers, switching devices, backflow preventers and telecommunications infrastructure. Place these elements in locations that will minimize their visual intrusion.

City of Palo Alto Utilities Continuous Task standard Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

L9.11.1 Implement the findings of the City’s Infrastructure Blue Ribbon Committee and its emphasis for rebuilding our civic spaces.

Department of Public
Works Continuous Task Substantial Ongoing
The Infrastructure Blue Ribbon Committee’s findings resulted in City Council’s adoption of the 2014 Council Infrastructure Plan, including ten priority projects.  Implementation of the plan is underway, with four of the projects completed, two projects in construction and others in the design process.

L9.11.2 Identify City‐owned properties where combinations of wireless facilities can be co‐located, assuming appropriate lease agreements are in place.

City of Palo Alto Utilities
& Planning and
Development Services
2022‐2027 N/A Complete
L9.12.1 Coordinate with regional utility providers on activities that would impact their infrastructure and right‐of‐ way.

City of Palo Alto
Utilities, Planning and
Development Services
and Department of
Continuous Task Standard Ongoing Coordination  is ongoing on a project by project basis, as needed.

L10.1.1 Relocate the terminal building away from the Runway 31 clear zone and closer to the hangars, allowing for construction of a replacement terminal.

Department of Public
Works After 2027 Substantial Pending Project  is pending FAA funding.

L10.1.2 Update the Airport Layout Plan in accordance with Federal Aviation Administration requirements, as needed, while ensuring conformance with the Baylands Master Plan to the maximum extent feasible.

Department of Public
Works  2022‐2027 Significant Partially  Complete City Council provided feed back in Sept 2024. Additional, public outreach is required, and additional funding is likely to be required.

L10.1.3 Identify and pursue funding to address maintenance, safety and security improvements needed at PAO. Department of Public Works  Continuous Task Standard Ongoing There  are no updates to report at this time.

L10.3.1 Establish and implement a system for processing, tracking and reporting noise complaints regarding local airport operations on an annual basis,
Department of Public
Works  By 2022 Standard Partially  Complete
In 2024, the Airport entered into an agreement with a flight tracking software to monitor compliance with voluntary noise abatement procedures. Staff is in the process of implementing the software.

L10.3.2
Work with the airport to pursue opportunities to enhance the open space and habitat  value of the airport. These include:
‐Maintaining native grasses;
‐Reconstructing levees to protect the
airport from sea level rise while
enhancing public access and habitat
conservation; and
‐Evaluating the introduction of
burrowing owl habitat.

This program is subject to federal wildlife hazard requirements and guidelines for airports.

Community Services
Department and
Department of Public
Works
Continuous Task Significant Pending Staff will review the proposed opportunities and collaborate to determine potential future measures.

L10.4.1
Continue to provide a bicycle/pedestrian path adjacent to Embarcadero Road, consistent with the Baylands Master Plan and open space character of the Baylands subject to federal and State airport regulations.

Department of Public
Works and Office of
Transportation
Continuous Task Standard Ongoing No  change from 2023
N1.1.1 Develop Comprehensive Resource Conservation Plans for the Pearson Arastradero Preserve, Esther Clark Preserve, and Foothills Park to steward the protection of local ecosystems.

Community Services
Department 2022‐2027 Substantial Pending Staff are currently collaborating on a Baylands comprehensive conservation plan. Once complete, this will be reviewed.

N1.3.1 Work to maintain Williamson Act agricultural preserve contracts within the City. Planning and Development Services By 2022 Standard Ongoing The parcels under Williamson Act contract are reviewed by the City Council every year and extended for an additional one year term if the property owners choses to continue it.

N1.3.2 Provide information and support programs that encourage residents to enhance their private yards with native plant species and low impact landscaping.

Department of Public
Works and Office of
Transportation
Continuous Task Significant Ongoing
This is an ongoing program, no updates to report at this time. The updated Tree and Landscape Technical Manual that is scheduled to be published in CY25 includes details on the advantages of using native plants and low impact landscape designs.

Goal L‐10: Maintain an economically viable local airport with minimal environmental impacts.

Natural Environment Element
Goal N‐1: Protect, conserve and enhance Palo Alto’s citywide system of open space, including connected and accessible natural and urban habitats, ecosystems, and natural resources, providing a source of public health, natural beauty and enjoyment for Palo Alto residents.

Page 14 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N1.4.1
Periodically review California Environmental Quality Act (CEQA) thresholds of significance regarding special status species to identify changes in listed species recommended by professionally recognized scientific experts.

Planning and
Development Services Continuous Task Standard Ongoing This  is an ongoing program, no updates to report at this time.

N1.4.2
Explore the feasibility of expanding the use of overlay tools such as the Site and Design (D) Review Combining District or similar development review and restriction tools to protect special‐status species and their habitats from development.

Planning and
Development Services 2022‐2027 Standard Partially  Complete Work has begun on three different environmentally focused ordinances, which are expected to be adopted by the end of the year: Bird Safe Design Standards (see also L6.3.1), Dark Sky Ordinance, and Stream Corridor Protection (see also N3.3.1).

N1.1.2 Promote and support ecosystem protection and environmental education programs in Palo Alto and neighboring school districts.

Community Services
Department By 2022 Standard Ongoing
This is an ongoing outreach and educational item to promote and support the EEC and Open Space Areas.  The Art Center continues to support the City’s focus on environmental sustainability, continuing to work on our climate action plan and to make steps to promote a more sustainable ceramics studio. Exhibitions on few in FY24 highlighted the connections between food and sustainability, including In Feast or Famine and those elements were reinforced in our K‐5 school tour program Project Look.

N1.4.3 Assess opportunities to expand habitats of special – status species within publicly‐owned open spaces. Community Services Department Continuous Task Standard Ongoing
This is an ongoing task, there are no changes form previous years reporting. Annually plants approx. 10,000 native plants to support endangered species the Ridgway's rail and the saltmarsh harvest mouse at the Baylands Nature Preserve.

N1.5.1 Maintain the value of local wetlands as habitats by ensuring adequate flow from the Bay and minimizing effluent.

Community Services
Department Continuous Task Standard Ongoing
The Baylands Tide Gate seismic retrofit and rehabilitation project is tentatively scheduled for September 2025 by Valley Water. Sluice gate operation will continue to manage water levels and ensure habitat protection and establishment.

N1.6.1 Continue to coordinate City review, particularly by Planning, Public Works and Community Services Departments, of projects that might impact the City’s foothills and hillside areas.

Planning and
Development Services Continuous Task Standard   Ongoing This  is an ongoing program, no updates to report at this time.

N1.7.1 Examine and improve existing management practices, including the provision of access to open space for City vehicles and equipment, to ensure that natural resources are protected.

Community Services
Department Continuous Task Standard Ongoing No  change from previous year reporting. This is an ongoing task.

N1.7.2
Protect wildlife in public open space areas by improving litter collection, restricting the use of non‐ recyclable plastics, prohibiting the feeding of wild, feral and stray animals in open space, and enforcing dog leash laws.

Community Services
Department Continuous Task Standard Ongoing Open Space staff continue to enforce the existing no feeding wild life rules and the dog leash laws. This continues to be an ongoing task.

N1.7.3 Provide information about responsible behavior in environmentally‐sensitive areas through signage, pamphlets and documents on the City’s website.

Community Services
Department Continuous Task Standard Ongoing Improved signage to educate visitors on leash laws, litter, and use of E‐Bikes in respective areas throughout parks and open spaces. This continues to be an ongoing task.

N1.7.4 Review and map existing easements and maintenance roads for potential trails and trail connections. Community Services Department By 2022 Significant Pending Work  has not commenced due to staff priorities.

N1.10.1 Use City funds and seek additional sources of funding, including State and federal programs, to finance open space acquisition, maintenance or conservation.

Community Services
Department Continuous Task Standard Ongoing City General funds were authorized for FY 24‐25. Fuel reduction Eucalyptus removal work has begun at Esther Clark Park Open Space.

N1.10.2
Create mechanisms to monitor, assess and respond quickly to land acquisition opportunities that would expand or connect the City’s system of parks and open spaces, and establish a long‐term funding strategy for acquisition that would enable the City to move quickly when opportunities arise.

Community Services
Department By 2022 Substantial Ongoing No  change from previous year reporting. This is an ongoing task.

N2.1.1 Explore ways to prevent and ameliorate damage to trees and tree roots by above and below ground infrastructure and buildings.

Department of Public
Works  Continuous Task Standard Ongoing This  is an ongoing program, no updates to report at this time.

Goal N‐2: A thriving urban forest that provides public health, ecological, economic, and aesthetic benefits for Palo Alto.

Page 15 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N2.2.1 Periodically update the UFMP and Tree Protection Ordinance to ensure policies and regulations remain relevant set leading standards for tree health practices.

Department of Public
Works  Continuous Task Significant Ongoing
This is an ongoing program. In 2024 a review of recent updates to the Tree Protection Ordinance was completed with minor changes recommended and adopted by council.

Initial review and potential update to the Urban Forest Master Plan is scheduled to begin in CY2025.

N2.4.1 Promote landscape design that optimizes soil volume, porosity, structure and health, as well the location, shape and configuration of soil beds.

Planning and
Development Services
and  Department of
Public Works
2022‐2027 Standard Ongoing
This is an ongoing task. Collaborative review  with Urban Forestry staff of major projects is conducted through Architectural Review Board. Detailed requirements and best practices for soils included in landscape projects are included in the upcoming Tree and Landscape Technical Manual.

N2.7.1 Maintain and irrigate healthy trees in parks, open space, parking lots, and City rights‐of‐way, while identifying and replacing unhealthy trees in those areas.

Department of Public
Works  By 2022 Significant Ongoing
This is an ongoing program. Summer time watering of newly planted street trees by city staff continues. City staff is also exploring the potential of succession planting in areas with large numbers of trees approaching the end of viable life span.

N2.7.2 Continue to invest in the care, irrigation and monitoring of street trees during drought conditions. Department of Public Works  Continuous Task Significant Ongoing This is an ongoing program. Annual summer time watering of newly planted street trees by city staff continues.

N2.7.3
Actively pursue funding for tree planting to increase canopy cover significantly across the city, avoid a net loss of canopy at the neighborhood level, and attain canopy size targets in parks, open space, parking lots, and City rights‐of‐way.

Department of Public
Works  Continuous Task Standard Ongoing This  is an ongoing program, no updates to report at this time.

N2.9.1 Increase awareness, severity and enforcement of penalties for tree damage. Department of Public Works  2022‐2027 Standard Ongoing
This is an ongoing program. Increased penalties associated with damage to and unauthorized removal of protected trees are included in Title 8 of Palo Alto Municipal Code. Additionally, changes to the administrative penalty schedule related to Title 8 code violations went into effect in FY24.

N2.9.2
Develop a program for using the City’s Urban Forestry Fund to replace trees lost to public improvement and infrastructure projects, with replanting occurring onsite or as close to the original site as is ecologically appropriate.

Department of Public
Works  2022‐2027 Significant Ongoing This  is an ongoing program, no updates to report at this time.

N2.10.1 Continue to require replacement of trees, including street trees lost to new development.

Planning and
Development Services
and Department of
Continuous Task Standard Ongoing This is an ongoing requirement as part of the architectural review and other development review processes. Replacement trees are required to ensure ‘no net loss of canopy’.

N2.10.2
As part of the update of the Tree and Landscape Technical Manual, consider expanding tree protections to include additional mature trees and provide criteria for making site‐specific determinations of trees that should be protected.

Planning and
Development Services
and Department of
Public Works
By 2022 Standard   Partially Complete
The Tree and Landscape Technical Manual is in the process of being finalized and will be submitted to the City Manager for review and approval in FY25. Expanded protections for mature trees are now included in Title 8 of Palo Alto Municipal Code.

N2.10.3 Consider revisions to the appeals process to increase transparency regarding tree removals and expanded opportunities for community members to appeal the removal of trees.

Planning and
Development Services
and Department of
Public Works
After 2027 N/A Complete Title  8 of Palo Alto Municipal Code includes an appeals process that is now active.

N2.11.1 Develop a transparent and publicly accessible street tree removal and replacement schedule. Department of Public Works  2022‐2027 Significant Pending
There are no substantial actions to report at this time. Staff have begun case studies on several residential blocks to better determine timing and costs associated with replacing street trees reaching the end of their lifespan. Progress city wide will be limited if the program is undertaken without  additional resources.

N2.11.2 Develop a program to replace unhealthy public trees over time. Department of Public Works  2022‐2027 Significant Ongoing This  is an ongoing program, no updates to report at this time.

N2.12.1 Explore ways to leverage the fact that Palo Alto’s urban forest alleviates climate change by capturing and storing carbon dioxide.

Department of Public
Works  2022‐2027 Significant Pending There  are no substantial actions to report at this time.

N2.13.1
Work with local nonprofits to establish one or more tree planting programs that are consistent with the UFMP, and rely on locally native, resilient species. Review existing tree planting guidelines to ensure they achieve these objectives.

Department of Public
Works  By 2022 Significant Partially  Complete
The South Palo Alto Tree Planting Program continues to be implemented by our non‐profit partner organization. The city has also created a preferred and restricted species list that has been incorporated into the Canopy online tree tool to prioritize locally native and climate resilient species.

Page 16 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N2.13.2 Provide on‐going education for City staff, residents, and developers regarding landscape, maintenance, and irrigation practices that protect the urban forest and wildlife species.

Department of Public
Works  Continuous Task Standard Pending
There are no substantial actions to report at this time. Efforts to provide education regarding landscape, maintenance, and irrigation practices that protect the urban forest and wildlife species is scheduled to begin in FY25 as part of the Tree and Landscape Technical Manual update outreach.

N2.13.3 Involve tree owners in tree maintenance programs.

Planning and
Development Services
and Department of
Public Works
Continuous Task Standard Ongoing
The Tree Protection Ordinance includes notification requirements for maintenance of protected trees. As part of this process, tree owners are informed of basic tree care best practices and are provided with links to more detailed information. The yet to be published Tree and Landscape Technical Manual will also provide basic best practices information on tree and landscape installation and maintenance.

N2.13.4
Cooperate with the Palo Alto Unified School District, Stanford University, Caltrain, Caltrans, Pacific Gas & Electric, and other public and private entities to ensure that their tree planting, tree removal, and maintenance practices are consistent with City guidelines.

Department of Public
Works  Continuous Task Standard   Pending There are no substantial actions to report at this time. Progress will begin once the updated Tree and Landscape Technical Manual is published.

N3.3.1
Update the Stream Corridor Protection Ordinance to explore 150 feet as the desired stream setback along natural creeks in open space and rural areas west of Foothill Expressway. This 150‐foot setback would prohibit the siting of buildings and other structures, impervious surfaces, outdoor activity areas and ornamental landscaped areas within 150 feet of the top of a creek bank. Allow passive or intermittent outdoor activities and pedestrian, equestrian and bicycle pathways along natural creeks where there are adequate setbacks to protect the natural riparian environment. Within the setback area, provide a border of native riparian vegetation at least 30 feet along the creek bank.

The update to the Stream Protection Ordinance should establish:
‐Design recommendations for development or redevelopment of sites within the setback, consistent with basic creek habitat objectives and significant net improvements in the condition of the creek. ‐Conditions under which single‐family property and existing development are exempt from the 150‐foot setback
‐Appropriate setbacks and creek conservation measures for undeveloped parcels.

Planning and
Development Services By 2022 Standard Ongoing
A community meeting is scheduled for February 2025. Staff will bring back the updated ordinance for
PTC recommendation in early 2025. Currently, an adoption hearing with the City Council is anticipated in June 2025.

N3.3.2
Examine the development regulations of the Stream Corridor Protection Ordinance, with stakeholder involvement to establish appropriate setback requirements that reflect the varying natural and channelized conditions along creeks east of Foothill Expressway. Ensure that opportunities to provide an enhanced riparian setback along urban creeks as properties are redeveloped or improved are included in this evaluation.

Planning and
Development Services By 2022 Standard Ongoing
A community meeting is scheduled for February 2025. Staff will bring back the updated ordinance for PTC recommendation in early 2025. Currently, an adoption hearing with the City Council is anticipated in June 2025.

N3.3.3
For all creeks, update the Stream Corridor Protection Ordinance to minimize impacts on wildlife by:

LimiƟng the development of recreaƟonal trails to one side of natural riparian corridors.

Requiring careful design of lighƟng surrounding natural riparian corridors to maximize the distance between nighttime lighting and riparian corridors
and direct lighting away from the riparian corridor.

Planning and
Development Services
and Department of
Public Works
By 2022 Significant Ongoing
A recommendation hearing for the updated lighting ordinance with PTC was conducted in October 2024; adoption hearing with the City Council is tentatively scheduled for early 2025
Goal N‐3: Conservation of both natural and channelized creeks and riparian areas as open space amenities, natural habitat areas, and elements of community design.

Page 17 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N3.4.1 Develop a community creek stewardship program to promote existing creek clean‐up days, organize new events, and increase appreciation of riparian corridors.

Department of Public
Works  2022‐2027 Significant Ongoing Continue to work with Grassroots Ecology who manage a creek stewardship and education program.

N3.6.1
Review and update the Grading Ordinance to ensure that it adequately protects creeks from the erosion and sedimentation impacts of grading. Department of Public Works  2022‐2027 Significant Partially  Complete  Target adoption for Stormwater ordinance is early 2025 N3.8.1
Work with the SCVWD to develop a maintenance, restoration and enhancement improvement program that preserves flood protection while preserving riparian habitat, and identifies specific stretches of corridor to be restored or daylighted, standards to be achieved, and sources of funding. Include provisions for tree and vegetation planting to enhance natural habitat and shade cover.

Department of Public
Works  2022‐2027 Significant Partially  complete Limited progress has been made, except for the work on the North Ventura Coordinated Area Plan.

N3.8.2 Participate cooperatively in the JPA to achieve increased flood protection, habitat preservation, enhancement and improved recreational opportunities along San Francisquito Creek.

Department of Public
Works  Continuous Task Standard Ongoing This  is an ongoing program, no updates to report at this time.

N4.2.1 Educate customers on efficient water use (indoor and outdoor), tree care, and landscaping options.

City of Palo Alto Utilities
& Department of Public
Works
Continuous Task Standard Ongoing
The City, in partnership with Valley Water, offers a suite of water efficiency programs including landscape conversion rebates, indoor and outdoor survey kits, graywater laundry to landscape rebates, irrigation system rebates and rain barrel rebates.  The City offers a variety of workshops on water efficiency and plant care throughout the year.

N4.5.1 Study the supply and quality of local groundwater aquifers to better understand their utility as natural water storage.

City of Palo Alto Utilities
& Department of Public
Works
By 2022 Standard Partially  Complete
In July 2022, the City initiated a One Water Plan that will analyze all water sources within the City. Preliminary results were presented to the Utilities Advisory Commission in June 2024. The report is expected to be complete by the end of the calendar year.

N4.5.2 Work with local public agencies to educate residents regarding the public health, fire, and overall quality of life risks associated with long‐term drought.

City of Palo Alto
Utilities,  Department of
Public Works & Office of
Continuous Task Standard Ongoing The 2023 Local Hazard Mitigation Plan describes the risks from drought and this information is posted on the city's website.

N4.6.1 Encourage residents to use rain barrels or other rainwater reuse systems. Department of Public Works  By 2022 Standard Ongoing
Staff continues to educate residents on this through the implementation of the Stormwater Rebate Program (in partnership with Valley Water), inter‐departmental coordination with Utilities (workshops, outreach efforts). Staff conducted outreach in 2024, and schedules outreach annually.

N4.7.1
Support and participate in the work of the SCVWD to prepare a high‐quality groundwater management plan that will address groundwater supply and quality, including, as appropriate:
‐An understanding of subsurface hydrology,
‐Strategies to reduce depletion,
‐Opportunities to recharge groundwater, including through use of recycled water and extracted groundwater,
‐Methods to ensure that
uncontaminated, toxin‐free groundwater is used in a manner that benefits the community, for example in irrigation of parks, street cleaning, and dust suppression, ‐An approach to metering extracted groundwater.

Department of Public
Works  By 2022 Standard Ongoing City staff continues to work with Valley Water on the monitoring of groundwater and map the toxic plumes in our region.

N4.7.2 Support the SCVWD and the Regional Water Quality Control Board (RWQCB) to implement their mandate to protect groundwater from the adverse impacts of urban uses.

Department of Public
Works  By 2022 Standard Ongoing This  is an ongoing program, no updates to report at this time.

N4.7.3
Work with the SCVWD and RWQCB to identify and map key groundwater recharge and stormwater management areas for use in land use planning and permitting and the protection of groundwater resources.

Department of Public
Works  Continuous Task Standard Ongoing
Staff is implementing the City's Green Stormwater Infrastructure (GSI) plan and is evaluating the best locations for GSI in the future and how to maintain the features to protect groundwater resources.

Goal N‐4: Water resources and infrastructure that are managed to sustain plant and animal life, support urban activities, and protect public health and safety.

Page 18 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N4.8.1 Research and promote new construction techniques and recharge strategies developed to reduce subsurface and surface water impacts and comply with City dewatering policies.

Department of Public
Works  Continuous Task Standard Ongoing This  on hold due to staff constraints N4.8.2 Explore appropriate ways to monitor all excavations and other projects to ensure that dewatering does not result in recharge into the aquifer where needed.

Department of Public
Works  By 2022 Standard Ongoing This  is an ongoing effort.

N4.10.1
Monitor and implement practices for reducing water pollution. Examples include state‐of‐the‐art best management practices (BMPs), land use planning approaches, and construction of modern stormwater management facilities.

Department of Public
Works  Continuous Task Substantial Ongoing
Stormwater ordinance anticipated to be adopted mid‐2025. Stormwater Program in Environmental Services addresses implementation of requirements such as construction of green stormwater infrastructure and best management practices at businesses.

N4.10.2 Continue public education programs on water quality issues, including BMPs for residents, businesses, contractors, and City employees.

Department of Public
Works  Continuous Task Standard Ongoing This work continues via flyers, tabling, bill inserts, targeted messages, social media, and the website.

N4.10.3 Implement swift and rigorous spill response, cleanup, and follow‐up investigation procedures to reduce the impacts of toxic spills on the city’s creeks and San Francisco Bay.

Department of Public
Works  Continuous Task Significant Ongoing
Stormwater ordinance anticipated to be adopted mid 2025. Stormwater Program in Environmental Services manages a spill response investigation program and coordinates with Fire and Public Works Public Services to ensure appropriate cleanup and reporting.

N4.10.4 Increase monitoring and enforcement of existing prohibitions on materials and practices known to impact local water quality, such as use of copper, in the design and construction industries.

Department of Public
Works  Continuous Task Significant Ongoing
Stormwater ordinance anticipated to be adopted early 2025. Stormwater Program in Environmental Services oversees a construction program to ensure appropriate stormwater best management practices at construction sites.

N4.11.1 Evaluate neighborhoods where parking controls may hinder street sweeping and recommend any changes that are needed.

Department of Public
Works  2022‐2027 Standard   Pending Work  has not commenced due to other pending items having higher priorities.

N4.12.1 Implement the City’s Integrated Pest Management Policy with periodic assessments of pesticide use and use of BMPs to reduce pesticide applications and toxicity, and maximize non‐chemical control.

Department of Public
Works  Continuous Task Standard Ongoing Continue to implement the City's Integrated Pest Management Policy N4.12.2 Revise the City’s Tree and Landscape Technical Manual to include stronger requirements for least‐toxic practices in the landscape permitting process.

Department of Public
Works  By 2022 Standard Partially  Complete
The draft updated Tree and Landscape Technical Manual is scheduled to be released for department feedback and public comment before the end of 2024, with a final draft released in 2025.

N4.12.3 Promote the value of toxin‐free landscape management, and educate residents about the impacts of common fertilizers, herbicides, insecticides and pesticides on local water quality.

Department of Public
Works  Continuous Task Standard Ongoing This is an ongoing effort. Staff continues to educate residents and businesses regarding proper pest control.

N4.13.1 Promote the use of permeable paving materials or other design solutions that allow for natural percolation and site drainage through a Storm Water Rebate Program and other incentives.

Department of Public
Works  By 2022 Standard Ongoing
Staff continues to educate residents on this through the implementation of the Stormwater Rebate Program (in partnership with Valley Water), inter‐departmental coordination with Utilities (workshops, outreach efforts). Will conduct outreach campaign in October 2024.

N4.13.2 Develop and implement a green stormwater infrastructure plan with the goal to treat and infiltrate stormwater.

Department of Public
Works  By 2022 Substantial Ongoing Currently  implementing the Green Stormwater Infrastructure Plan.

N4.13.3 Mitigate flooding through improved surface permeability or paved areas, and stormwater capture and storage.

Department of Public
Works  By 2022 Significant Ongoing Currently implementing the Green Stormwater Infrastructure (GSI) Plan. Began work on large GSI project to capture diverted flows from storm drain system.

N4.14.1 Establish a standardized process for evaluating the impacts of development on the storm drainage system, including point source discharge, base flow and peak flow.

Department of Public
Works  By 2022 Standard Ongoing
Projects that require a building permit are reviewed by Public Works staff to verify that the proposed runoff from project sites is equal to or less than the existing runoff. Any excess flow must be detained or retained on‐site.

N4.14.2 Complete improvements to the storm drainage system consistent with the priorities outlined in the City's Storm Drainage Master Plan, as amended.

Department of Public
Works  Continuous Task Substantial Ongoing Storm Drainage Master Plan projects are being implemented through the Capital Improvement Program using funding from the Stormwater Management Fee.

N4.15.1 Work with commercial and industrial dischargers to identify and implement pollution prevention measures and BMPs to eliminate or reduce the discharge of metals and other pollutants of concern.

Department of Public
Works  Continuous Task Significant Ongoing Environmental Services conducts inspections at industrial and commercial businesses and requires and educates about best management practices.

Page 19 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N4.15.2 Encourage commercial dischargers to consistently go beyond minimum requirements of the Clean Bay Business Program.

Department of Public
Works  Continuous Task Standard Partially  Complete Target  adoption for Stormwater ordinance is mid‐2025 N4.16.1 Implement approved recommendations based on the Long‐Term Facilities Plan prepared for the RWQCP. Department of Public Works  Continuous Task Substantial Ongoing
Design complete for the Outfall Project.  Substantial completion of construction for the Primary Sedimentation Tank Rehabilitation Project and construction started for the Secondary Treatment process and 12KV loop project.

N4.16.2 Develop a plan to address ongoing operations of the RWQCP taking potential sea level rise and growth in surrounding communities into account.

Department of Public
Works  2022‐2027 Substantial Ongoing
A Sea Level Rise vulnerability assessment is complete and RWQCP is iteratively raising all electrical and other equipment to adapt to 100 year storm and future sea level rise.  Sea level rise adaptation is included in the RWQCP Long Range Facility Plan Update.

N4.17.1 Evaluate the expansion of existing recycled water infrastructure to serve a larger area. Develop a plan to install “purple pipe” when streets are opened for other infrastructure work. City of Palo Alto Utilities 2022‐2027 Significant Ongoing Council accepted the Northwest County Recycled Water Strategic Plan in 2020. A plan to coordinate the installation of purple pipe when streets are open has not been developed and is not currently in the work plan.

N4.17.2 Evaluate the possibility of using recycled water as an emergency water supply. City  of Palo Alto Utilities After 2027 Standard Ongoing Using  recycled water as an emergency water supply is not under consideration.

N4.17.3 Investigate ways to reuse non‐traditional water sources including recycled, gray, black and storm water. City  of Palo Alto Utilities Continuous Task Standard Partially  Complete In July 2022, the City initiated a One Water Plan that will analyze all water sources within the City. Preliminary results were presented to the Utilities Advisory Commission in June 2024. The report is expected to be complete by the end of the calendar year.

N5.1.1 Provide City input on significant proposals for air quality legislation and state implementation plans. Planning and Development Services Continuous Task Standard Ongoing Planning  Department works with the City lobbyist to identify issues and provides ideas.

N5.1.2 Implement BAAQMD recommended standards for the design of buildings near heavily travelled roads, in order to minimize exposure to auto‐related emissions.

Planning and
Development Services By 2022 Standard Ongoing Bay Area Air Quality Management District (BAAQMD) standards are implemented through the CEQA process.

N5.1.3 Explore adopting new standards that target the reduction of very fine particulate matter (PM2.5), which is associated with increased impacts on health.

Planning and
Development Services By 2022 Standard Ongoing PM2.5  standards are implemented through the CEQA process.

N5.2.1 Promote understanding of the impacts of extended idling on air quality, for residents, auto‐dependent businesses, and schools.

Planning and
Development Services 2022‐2027 Standard Pending Work  has not commenced.

N5.2.2 Consider adopting and enforcing penalties for drivers that idle for longer than 3‐5 minutes. Office  of Transportation 2022‐2027 Standard Pending Work  has not commenced.

N5.3.1 Cooperatively work with Santa Clara County and the BAAQMD to ensure that mining and industrial operations mitigate environmental and health impacts.

Planning and
Development Services Continuous Task Standard Ongoing Industrial operations are mitigated through the CEQA process. There are no mining resources within the City limits.

N5.3.2 Monitor particulate emissions at local California Air Resources Board monitoring stations and make the information easily available to citizens.

Planning and
Development Services Continuous Task Standard Ongoing Bay Area Air Quality Management District (BAAQMD) provides monitoring information on their webpage ‐ http://www.baaqmd.gov/about‐air‐quality/current‐air‐quality.

N5.3.3
Promote understanding of the health impacts of particulate emissions and provide information to residents and businesses about steps they can take to reduce particulate emissions, such as reducing or eliminating wood burning or using low emission alternatives to wood‐burning stoves and fireplaces.

Planning and
Development Services Continuous Task Standard Ongoing Current Planning staff continues to implement CEQA but does not conduct additional outreach or education around this topic.

N5.3.4 Explore feasible and cost‐effective opportunities to reduce concrete and asphalt use by the City, in parks and other public projects.

Department of Public
Works  Continuous Task Standard Ongoing There  are no substantial actions to report at this time.

N6.3.1 Continue working to reduce noise impacts created by events and activities taking place in communities adjoining Palo Alto.

Planning and
Development Services Continuous Task Standard   Ongoing Staff  implements the City's noise ordinance.

N6.3.2 Evaluate the feasibility of adopting noise criteria in the purchase of new City vehicles and equipment. Department of Public Works  2022‐2027 Standard Pending No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

Goal N‐5: Clean, healthful air for Palo Alto and the San Francisco Bay Area.

Goal N‐6: An environment that minimizes the adverse impacts of noise.

Page 20 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N6.3.3 Update the Noise Ordinance, as needed, to provide for clear interpretation of the regulations, to review the effectiveness of existing standards, and to ensure that regulations address contemporary issues.

Planning and
Development Services By 2022 Standard Partially  Complete Residential  portion has been updated.

N6.7.1
Update noise impact review procedures in the Noise Ordinance and the Zoning Code to address appropriate requirements for analysis and thresholds for impacts on residential land uses and publicly‐ owned conservation land.

Planning and
Development Services By 2022 Standard Partially  Complete Residential  portion has been updated.

N6.10.1 Evaluate changes to the Noise Ordinance to further reduce the impacts of noise from leaf blowers and residential power equipment.

Planning and
Development Services 2022‐2027 N/A Complete
The code enforcement team as completed its initial goal to enhance the gas leaf blower program by adopting the ordinance in June of 2023.  Moving forward, the code enforcement has and will continue to proactive patrol neighborhoods, respond to complaints and utilize  established tools to accomplish the goal of bringing forth compliance with banning the use of gas leaf blowers.

N6.11.1
For larger development projects that demand intensive construction periods and/or use equipment that could create vibration impacts, such as the Stanford University Medical Center or major grade separation projects, require a vibration impact analysis, as well as formal, ongoing monitoring and reporting of noise levels throughout the entire construction process pertinent to industry standards. The monitoring plan should identify hours of operation and could include information on the monitoring locations, durations and regularity, the instrumentation to be used and appropriate noise control measures to ensure compliance with the noise
ordinance.

Planning and
Development Services Continuous Task Standard Ongoing
Construction noise and vibration are reviewed as part of the CEQA process. Mitigation measures, including limited hours of operation, are used to reduce noise and vibration impacts.

N6.12.1
Continue working to reduce noise associated with operations of the Palo Alto Airport. Also, ensure compliance with the land use compatibility standards for community noise environments, shown in Table N‐ 1, by prohibiting incompatible land use development within the 60 dBA CNEL noise contours of the airport.

Department of Public
Works  Continuous Task Standard Ongoing No  updates at this time.

N6.12.2
Participate in appropriate public forums and engage with other governmental agencies and representatives to ensure that activities at airports in the region do not negatively affect noise levels in Palo Alto.

Department of Public
Works  Continuous Task Substantial Ongoing
Airport staff continue to review current flight procedures at the Palo Alto Airport.

However, the airport has limited staffing to review regional flight patterns not related to the Palo Alto Airport.

N6.13.1 Encourage the Peninsula Corridors Joint Powers Board to pursue technologies and grade separations that would reduce or eliminate the need for train horns/whistles in communities served by rail service. Office of Transportation Continuous Task Standard Partially  Complete Staff procured the services of the Consultant to prepare design plans, specifications, and cost estimates. The 100% design plans are now complete. City submitted the project plans for approval of Caltrain's and requested their concurrence on submitting GO‐88B application to the CPUC.

N6.13.2
Evaluate changing at‐grade rail crossings so that they qualify as Quiet Zones based on Federal Railroad Administration (FRA) rules and guidelines in order to mitigate the effects of train horn noise without adversely affecting safety at railroad crossings.

Office of Transportation By 2022 Substantial Partially  Complete City procured the services of the consultant to conduct the study. The initial study report was reviewed by the Rail Committee in August 2024.  A diagnostic meeting consisting of staff from CPUC, FRA, Caltrain and City was conucted in October 2024. The conceptual plans for the required improvements are currently being developed.

N6.13.3
Participate in future environmental review of the California High‐Speed Rail (HSR) Project, planned to utilize existing Caltrain track through Palo Alto, to ensure that it adheres to noise and vibration mitigation measures.

Office of Transportation
& Planning Department By 2022 N/A Complete
N7.1.1 Meet customer electricity needs with least total cost resources after careful assessment of environmental cost and benefits. City of Palo Alto Utilities Continuous Task Standard Ongoing Implementation of the REC Exchange Program during CY 2024 has yielded approximately $10.9M in net revenue to be used to fund local decarbonization programs.

Goal N‐7: A clean, efficient energy supply that makes use of cost‐effective renewable resources.

Page 21 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N7.2.1 Promote the adoption of cost‐effective, renewable energy technologies from diverse renewable fuel sources by all customers.

City of Palo Alto Utilities
and Department of
Public Works
By 2022 Standard Ongoing Implementation of the REC Exchange Program during CY 2024 has yielded approximately $10.9M in net revenue to be used to fund local decarbonization programs.

N7.2.2
Assess the feasibility of using life cycle analysis and total cost of ownership analysis for public and private projects, funded by the project proponent, in order to minimize the consumption of energy, the production of greenhouse gases, including GHG emissions of construction materials and demolition and costs over the life of the project.

City of Palo Alto Utilities By 2022 Standard Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

N7.4.1 Continue timely incorporation of State and federal energy efficiency standards and policies in relevant City codes, regulations and procedures, and higher local efficiency standards that are cost‐effective.

Planning and
Development Services  Continuous Task Significant Ongoing Development Services staff worked collaboratively with Sustainability team to bring for the adoption of a new Green Building Standards Code and Energy Reach Code that complies with Ninth Circuit Court of Appeals finding that the Energy Policy and Conservation Act (EPCA) preempts state and local building codes that impermissibly regulate energy use by products covered by EPCA, like natural gas appliances.  The next update will be in 2025 when we adopt the 2025 California Energy Code and Green Building Standards Code.

N7.4.2 Implement cost effective energy efficiency programs for all customers, including low income customers. City  of Palo Alto Utilities Continuous Task Standard Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

N7.4.3 Incorporate cost‐effective energy conservation measures into construction, maintenance, and City operation and procurement practices.

Department of Public
Works Continuous Task Standard Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

N7.4.4 Implement gas and electric rate structures that encourage efficient use of resources while meeting State law requirements that rates be based on the cost of service. City of Palo Alto Utilities 2022‐2027 Standard Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

N7.4.5 Continue to provide public education programs addressing energy conservation and efficiency. City  of Palo Alto Utilities Continuous Task Standard Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

N7.5.1 Monitor professional and medically‐sound research and studies on light‐emitting diodes (LEDs). City  of Palo Alto Utilities 2022‐2027 N/A Complete Complete N7.6.1 Explore changes to building and zoning codes to incorporate solar energy, energy storage and other energy efficiency measures into major development projects, including City‐owned projects.

Planning and
Development Services By 2022 Significant Ongoing
Development Services staff worked collaboratively with Sustainability team to bring for the adoption of a new Green Building Standards Code and Energy Reach Code that complies with Ninth Circuit Court of Appeals finding that the Energy Policy and Conservation Act (EPCA) preempts state and local building codes that impermissibly regulate energy use by products covered by EPCA, like natural gas appliances.  The next update will be in 2025 when we adopt the 2025 California Energy Code and Green Building Standards Code.

N7.6.2 Promote use of the top floors of new and existing structured automobile garages for installation of photovoltaic panels and green roofs.

Planning and
Development Services  By 2022 Standard Ongoing This  effort is ongoing.

N7.6.3 Promote solar energy in individual private projects.

City of Palo Alto
Utilities, Planning and
Development Services
Continuous Task Significant Ongoing
This effort is linked to measure N7.6.1.  See update on N7.6.1.  Development Services launched the use of SolarAPP+ for qualifying residential PV and ESS projects via our instant permitting process.

N7.7.1 Evaluate the potential for a cost‐effective plan for transitioning to a completely carbon‐neutral natural gas supply. City of Palo Alto Utilities By 2022 Standard Ongoing Staff monitors the market for innovative green product availability and price. The Carbon Neutral Gas Plan using carbon offsets was reaffirmed by Council in December 2020.

Page 22 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N7.7.2 Explore the transition of existing buildings from gas to electric or solar water and space heating. City  of Palo Alto Utilities By 2022 Standard Ongoing The Business Energy Advisor program launched in August 2022 providing energy assessments to small to medium businesses, had a surge in participation as a result of tenacious outreach and promotions with in‐person visits to over 300 businesses in CY2024.

As of September 2024, 15 project completed total enrolled 91 since launch.

The Business Electrification Technical Assistance Program (BE TAP) was also launched in August 2022. This program offers free electrification assessment and technical assistance to implement building electrification projects to a variety of business types including but not limited to hotels, restaurants, churches, and office buildings. To date, program outreach activities have included in‐person visits, call campaigns, e‐newsletters, and utility bill inserts As of September 2024, there are 79 businesses enrolled in BETAP, 3 projects completed and 8 projects in the pipeline.

N7.8.1
Evaluate energy efficient approaches for the treatment and reuse of organic waste that maximize resource recovery and reduce greenhouse gas generation at the RWQCP located in Palo Alto and the Palo Alto Landfill.

Department of Public
Works  2022‐2027 Standard Ongoing
Reuse organic waste from the RWQCP; currently create Class A biosolids products and send a portion of the organics through an anaerobic digester to convert organics into a resource.

N8.1.1
Participate in cooperative planning with regional and local public agencies, including on the Sustainable Communities Strategy, on issues related to climate change, such as greenhouse gas reduction, water supply reliability, sea level rise, fire protection services, emergency medical services, and emergency response planning.

Office of Sustainability
and Office of Emergency
Services
Continuous Task Standard Ongoing
Office of Sustainability, Public Works, and Office of Emergency Services participated in regional working groups, including Santa Clara County. This aligns with the Sustainability and Climate Action Plan (S/CAP) goals and key actions as well as the 2023 ‐ 2025 S/CAP Work Plan.

N8.1.2 Pursue or exceed State goals of achieving zero net carbon for residential buildings by 2020 and commercial buildings by 2030, without compromising the urban forest.

Office of Sustainability,
City of Palo Alto Utilities
Department and
Planning and
Development Services
Department
By 2022 Standard Ongoing
On June 3, 2024, the City Council adopted the One Margin code ordinance, in light of the temporary moratorium on enforcement of Palo Alto’s current all‐electric new construction requirement. The City Council reviewed the Second Reading of the Ordinance on June 17, 2024. As required by state law, the ordinance was sent to the California Energy Commission for review and approval and was approved September 11, 2024.

N8.2.1
Periodically update the S/CAP consistent with the update schedule in the approved S/CAP; this update shall include an updated greenhouse gas inventory and updated short, medium, and long‐term emissions reduction goals.

Office of Sustainability 2022 ‐2027 Standard Partially  Complete In June 2023, the 2022 Sustainability and Climate Action Plan was adopted, the Comprehensive Plan Environmental Impact Report Addendum: Update to the Sustainability and Climate Action Plan was certified, and Council accepted the 2023‐2025 S/CAP Workplan. Staff completed the 2022 Greenhouse Gas Inventory, which will be brought to Council in October 2024. Staff completed a 2023 Greenhouse Gas Inventory.

There are no plans to update the S/CAP in 2024, as it was just adopted last year.

N8.3.1 Protect the Municipal Services Center, Utility Control Center, and RWQCP from the impacts of sea level rise.

Department of Public
Works  2022‐2027 Substantial Ongoing
A Sea Level Rise vulnerability assessment is complete and RWQCP is iteratively raising all electrical and other equipment to adapt to 100 year storm and future sea level rise.  Staff anticipates a proposal from Santa Clara County Office of Sustainability to partner on a sea level rise planning effort, and staff are exploring how to include sea level rise and shallow ground water conditions into project review in parallel.

Goal N‐8: Actively support regional efforts to reduce our contribution to climate change while adapting to the effects of climate change on land uses and city services.

Page 23 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
N8.4.1
Prepare response strategies that address sea level rise, increased flooding, landslides, soil erosion, storm events and other events related to climate change. Include strategies to respond to the impacts of sea level rise on Palo Alto’s levee system.

Office of Sustainability By  2022 Substantial Pending
A United States Army Corps of Engineers (USACE) cost/benefit analysis determined that there is no federal interest in funding Palo Alto shoreline improvements at this time, and that improvements would not be needed until approximately 2060. Valley Water and Shoreline II partners (Caltrans and the Cities of Palo Alto and Mountain View) developed an agency factsheetand Frequently Asked Questions for staff/public use and identified possible trigger points for when restarting an analysis could occur. Staff are now anticipating a proposal from Santa Clara County Office of Sustainability for next steps in developing a subrgional sea level rise adaptation plan now that  SB272 (Laird): Sea Level Rise Planning and Adaptation requirements are known‐‐likely starting with regional vulnerability assessment. City of Palo Alto staff will coordinate the development of its Sea Level Rise Adaptation Plan to align with these and other regional planning efforts.

Despite longer‐term regional planning horizons for sea level rise, staff are working on several near‐term goals. These efforts include rolling out the use of web‐based GIS maps which depict future sea level rise and shallow groundwater changes for use in City project planning,and including sea level rise in long range planning for the Regional Water Quality Control Plant and Palo Alto Airport.

S1.1.1
Expand public education programs that help and encourage each household in the City to be prepared to be self‐sufficient, with enough stored water and food to support the entire household for at least one week after a major earthquake, flood, terrorism event, COVID‐19 pandemic or other major disaster. Office of Emergency Services By 2022 Standard Ongoing
OES works with the City Manager's Office to provide community updates periodically across a number of mediums including City Manager comments, Uplift Local, Palo Alto Medium blog, Utility Inserts, and social media posts.   The OES Preparedness webpage also provides this information. We attempt to expand our public education to all groups in the Palo Alto community.

S1.1.2 Continue to implement and fund the Emergency Services Volunteer program. Office of Emergency Services By 2022 Standard Ongoing
Office of Emergency Services (OES) continues to manage the ESV program, there are currently over 800 registered volunteers. OES apportions funds annually to support this program including an annual community event, monthly training sessions, quarterly leader meetings, and several exercises per year.

S1.1.3 Conduct emergency hazard drills with key stakeholder organizations across the community to improve preparedness for known threats and hazards.

Office of Emergency
Services Continuous Task Significant Ongoing
Throughout the year, Office of Emergency Services (OES) conducts emergency drills with key stakeholders that include seminars, communications tests, table‐top exercises, functional, and full scale exercises.

S1.1.4 Support an annual community public safety fair to educate and engage the public on preparedness and offer the opportunity to buy emergency disaster supplies for home and vehicle.

Office of Emergency
Services Continuous Task Significant Ongoing
No public safety fairs were planned in this reporting period, instead OES participated in several citywide events to promote preparedness including the May Fete, MSC Open House, PAPD National Night Out, and the City Hall Open House.

Goal S‐1: A safe community that is aware of risks and prepared for emergencies.

Safety Element

Page 24 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
S1.1.5 Encourage local businesses and other organizations to have disaster preparedness, communication, mitigation and recovery plans in place.

Office of Emergency
Services Continuous Task Standard Ongoing OES works with businesses upon request to assist in preparedness planning. The OES website includes preparedness related information for businesses as well.

S1.2.1 Develop accessible, attractive marketing materials to promote involvement in community crime safety programs.

Office of Emergency
Services Continuous Task N/A Complete
S1.3.1 Explore the use of urban design principles to increase safety and prevent crime in Palo Alto.

Planning and
Development Services &
Office of Emergency
Services
Continuous Task Standard Ongoing
Office of Emergency Services (OES) maintains expertise and serves as a resource for Crime Prevention through Environmental Design (CPTED) https://www.ncpc.org/resources/home‐ neighborhood‐safety/crime‐prevention‐through‐environmental‐design‐training‐program/ and other safety and security best practices, in particular, for Critical Infrastructure and Key Resources (CIKR). OES is assisting City of Palo Alto Utilities (CPAU) with site protection and resilience matters.  OES is assisting Department of Public Works and Police Department with the Public Safety Building.

S1.3.2 Support programs such as the Department of Housing and Urban Development’s Good Neighbor Next Door, which incentivizes home purchase for first responders with discounts.

Planning and
Development Services Continuous Task Standard Pending Staff  is not aware of any progress on this program's implementation as of 2024.

S1.4.1 Make data available to maintain an accurate, up to date, and complete real‐time local crime mapping function to promote neighborhood safety. Police Department Continuous  Task Standard Ongoing Webpage  active S1.5.1
Promote neighborhood security by providing crime prevention information and training to residents, and continuing to fund resident involvement in neighborhood safety programs such as “Know Your Neighbor” grants and Block Preparedness
Coordinators.

Police Department and
Office of Emergency
Services
Continuous Task Standard Ongoing
OES provides BPC certification courses as part of our ESV program 3 times a year in which we encourage Neighborhood Watch activities.  OES also encourages the use of "Know Your Neighbor" grants by ESV members for block level parties.

S1.5.2 Collaborate with the Palo Alto Unified School District (PAUSD), other school districts in the city, private schools, businesses, non‐profits, and local faith‐based organizations provide community safety education. Police Department Continuous  Task Standard Ongoing No  change.

S1.5.3
Encourage the PAUSD to develop secure school facilities and collaborate with Emergency Services Volunteers on disaster preparedness activities; emergency disaster planning, exercises and drills; and disaster recovery.

Office of Emergency
Services Continuous Task Standard Ongoing OES and PAPD maintain contact with PAUSD and are available to provide support when requested by PAUSD.

S1.5.4 Continue to support and encourage participation in Police Department programs to introduce youth to the importance and benefits of local law enforcement. Police Department Continuous  Task Substantial Pending No  plan for program S1.6.1 Enhance public safety department training for evolving challenges, such as small‐ to large‐scale human threats, interacting with individuals with mental illness, and non‐lethal alternatives. Police Department Continuous  Task Substantial Ongoing Staff is working with Santa Clara County Behavioral Health Services (SCCO Behavioral Health) to hire a clinician. One PERT officer working solo.

S1.6.2
Support the PAPD in implementing and maintaining approved technologies for data gathering, surveillance, and recording interactions with the public. Incorporate best practices in use policies with special consideration in ensuring the programs protect the public’s privacy rights and civil liberties, in accordance with current legislation. Ensure transparency by communicating new equipment implementation, usage, privacy considerations, and retention of data.

Police Department Continuous  Task Standard Ongoing AB  481 report given to Council annually.

S1.6.3 Communicate transparently with the community regarding adoption of new PAPD equipment and/or tactics while balancing the need for operational security. Police Department Continuous  Task Standard Ongoing AB  481 report given to Council annually.

Page 25 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
S1.7.1
Regularly monitor and review the level of public safety staffing and satellite police station locations required for efficient local service delivery. Police  Department Continuous  Task Standard Ongoing No  change S1.7.2 Design the new Public Safety building to meet essential service standards, the needs of the public safety departments and be resilient against known threats and hazards.

Department of Public
Works  By 2022 Substantial Ongoing Construction  started in spring 2021 and is expected to be completed in fall 2024.

S1.7.3 Provide community notifications in the event of emergency using the best available methods and explore new technologies for emergency public information and warnings.

Office of Emergency
Services Continuous Task Significant Ongoing
OES remains proficient in the use of the Everbridge software system, that provides the AlertSCC mass notification functionality. OES also can provide notifications via Next door, and in working with City communications managers ‐ proliferate such messages on other social mediums.

S1.8.1 Update Palo Alto’s 2001 Terrorism Response Plan. Office  of Emergency  By 2022 N/A Complete S1.9.1
Develop an Infrastructure Master Plan that projects the future needs of streets, underground utilities, and all City assets and plans for the incorporation of new technology that improves efficiency and effectiveness.

Department of Public
Works  By 2022 Substantial Partially  Complete No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

S1.10.1 Regularly update and make publicly available the City of Palo Alto Emergency Operations Plan (EOP). Office of Emergency Services Continuous Task Significant Ongoing
OES will update the EOP in FY24/24 Q3.  This process started in August 2024 and we anticipate this will take approximately eight months to complete.  This update will take incorporate new legislative measures, emergency management, best practices, and whole community involvement.  The updated plan will be posted on the City of Palo Alto website.

S1.10.2 Participate in local and regional planning efforts to mitigate, prepare for, respond to, and recover from emergencies.

Office of Emergency
Services Continuous Task Standard Ongoing
OES continues to participate in regional planning efforts including the Urban Area Security Initiative (UASI), the Mutual Aid Regional Advisory Committee (MARAC), and Santa Clara County Operational Area Signatories Committee, and the Santa Clara County Emergency Managers Association ‐ among others.  OES continues to lead the San Francisquito Creek Multi‐Agency Coordination (SFC MAC) group as well as the Silicon Valley Homeland Security Coordination Group (SV‐HSCG).

S1.10.3 Implement the mitigation strategies and guidelines provided by the LHMP, including those that address evolving hazards resulting from climate change.

Office of Emergency
Services Continuous Task Standard Ongoing
Annually, Office of Emergency Services updates the status of Local Hazard Mitigation Plan (LHMP) projects. The City updated the LHMP in 2023, with Council adoption occurring in October 2024, as part of the Santa Clara County multi‐jurisdictional planning process.

S1.12.1 Encourage multiagency coordination in case of incidents that cross disciplinary or jurisdictional boundaries or coordination that involves complex incident management scenarios.

Office of Emergency
Services Continuous Task Standard Ongoing
OES, PAPD, and PAFD implement multi‐agency coordination by integrating agencies into response efforts through mutual aid systems. This is done in keeping with the National Incident Management System (NIMS) and the State of California Standardized Emergency Management System (SEMS). This is done for both internal city departments, as well as for multi‐jurisdictional incidents or events.

S1.12.2 Explore the establishment of mutually‐beneficial cooperative agreements between Palo Alto’s police and fire departments and those of neighboring cities.

Police Department &
Fire Department 2022‐2027 Standard   Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

S1.13.1 Identify solutions to add an additional power line to Palo Alto to ensure redundancy. City  of Palo Alto Utilities By 2022 Substantial Ongoing No staff comments were received related to this program but staff did provide updated level of effort rating and completion status info.

S1.13.2 Explore incentives to adopt emerging, residential off‐ grid capabilities and technologies, including back‐up power sources vital in the event of natural disasters or other threats. City of Palo Alto Utilities 2022‐2027 significant Ongoing No staff comments were received related to this program but staff did provide updated level of effort rating and completion status info.

S1.13.3 Continue citywide efforts to underground utility wires to limit injury, loss of life, and damage to property in the event of human‐made or natural disasters. City of Palo Alto Utilities Continuous Task Significant Ongoing No staff comments were received related to this program but staff did provide updated level of effort rating and completion status info.

Page 26 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
S1.13.4
Enhance the safety of City‐owned natural gas pipeline operations. Work with customers, public safety officials, and industry leaders to ensure the safe delivery of natural gas throughout the service area.

Provide safety information to all residents on City‐owned natural gas distribution pipelines. City of Palo Alto Utilities Continuous Task Significant Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

S1.13.5 Provide off‐grid and/or backup power sources for critical City facilities to ensure uninterrupted power during emergencies and disasters.

City of Palo Alto Utilities
and  Department of
Public Works
Continuous Task standard Ongoing No staff comments were received related to this program but staff did provide updated level of effort rating and completion status info.

S2.5.1 Periodically review and update the City’s Seismic Hazard Ordinance. Planning and Development Services Continuous Task Significant Ongoing We created a RFP for this scope of services and are reviewing the two responses that we received.

S2.5.2 Continue to provide incentives for seismic retrofits of structures throughout the city, particularly those building types that would affect the most people in the event of an earthquake.

Planning and
Development Services By 2022 Significant Ongoing This  effort is linked to measure S2.5.1.  See update on S2.5.1.

S2.6.1 Encourage efforts by individual neighborhood or block‐ level groups to pool resources for seismic retrofits. Planning and Development Services 2022‐2027 Significant Ongoing This  effort is linked to measure S2.5.1.  See update on S2.5.1.

S2.6.2 Continue to use a seismic bonus and a TDR Ordinance for seismic retrofits for eligible structures in the Commercial Downtown (CD) zone.

Planning and
Development Services Continuous Task Significant Ongoing This  effort is linked to measure S2.5.1.  See update on S2.5.1.

S2.6.3 Evaluate the TDR Ordinance so that transferred development rights may be used for residential development on the receiver sites.

Planning and
Development Services Continuous Task Standard Pending Work  has not commenced.

S2.6.4 Study the possibility of revising the transfer of development rights program to encourage seismic retrofits.

Planning and
Development Services 2022‐2027 Standard Pending Work  has not commenced.

S2.6.5 Explore the use of Community Development Block Grants, Palo Alto Housing Funds and other sources of funding to support owners of lower income and senior housing to retrofit seismically‐unsafe construction.

Planning and
Development Services By 2022 Standard Ongoing This  is an ongoing program, no updates to report at this time.

S2.7.1
As part of the construction permitting process for proposed new and redeveloped buildings in areas of identified hazard shown on MapS‐2, structures that would affect the most people in a seismic event require submittal to the City of a geotechnical/seismic report that identifies specific risks and appropriate mitigation measures.

Planning and
Development Services  By 2022 Significant Ongoing This  effort is linked to measure S2.5.1.  See update on S2.5.1.

S2.7.2 Review and update, as appropriate, City code requirements for excavation, grading, filling and construction to ensure that they conform to currently accepted and adopted State standards.

Department of Public
Works  2022‐2027 Standard Ongoing The code requirements are currently up‐to‐date. Staff will continue to monitor accepted and adopted standards and update code as needed.

S2.7.3
Utilize the results of Palo Alto’s Seismic Hazards Identification Program and inventory of potentially seismically vulnerable building types to establish priorities and consider incentives to encourage structural retrofits.

Planning and
Development Services
and Building Services
By 2022 Significant Ongoing This  effort is linked to measure S2.5.1.  See update on S2.5.1.

S2.8.1 Implement flood mitigation requirements of FEMA in Special Flood Hazard Areas as illustrated on the Flood Insurance Rate Maps.

Department of Public
Works  Continuous Task Substantial Ongoing All private and public development projects within the Special Flood Hazard Areas are reviewed for compliance with FEMA regulations.

S2.8.2 Continue participating in FEMA’s Community Rating System to reduce flood insurance for local residents and businesses and strive to improve Palo Alto’s rating in order to lower the cost of flood insurance.

Department of Public
Works  Continuous Task Standard Ongoing City of Palo Alto continues to participate in the Community Rating System and to evaluate opportunities to improve the rating.

S2.8.3
Collaborate with the San Francisquito Creek Joint Powers Authority and the Santa Clara Valley Water District on environmentally‐sensitive efforts to stabilize, restore, maintain and provide one percent (100‐ year) flood protection adjacent to San Francisquito Creek.

Department of Public
Works  Continuous Task Substantial Ongoing The Highway 101 to Bay project was completed in 2018. The Upstream of Highway 101 project is currently in the Design Development and Entitlements process.

Goal S‐2: Protection of life, ecosystems and property from natural hazards and disasters, including earthquake, landslide, flooding, and fire.

Page 27 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
S2.8.4
Work with East Palo Alto, Santa Clara Valley Water District and San Francisquito Creek Joint Powers Authority on efforts to increase the flows within the San Francisquito Creek possible solutions include replacing the City‐owned Newell Road Bridge and Francisquito Creek. District‐owned Pope Chaucer Street Bridge.

Department of Public
Works  By 2022 Substantial ongoing
Staff received 100% design and cost estimates for Newell Road Bridge in March 2023. All regulatory permits and construction easements were obtained in May 2024.  Staff is working to obtain right‐of‐way certification from Caltrans in October with bidding of the project anticipated to be in early 2025 and construction to start in summer 2025. Staff continues to work with the San Francisquito Creek Joint Powers Board (SFCJPA) member agencies to coordinate other Reach 2 projects with the Newell Road Bridge replacement project. The remaining Reach 2 projects (top of bank, creek‐widening, Pope‐Chaucer Bridge Replacement) are on hold pending creek model redesign based on recent winter storm results.

S2.10.1 Keep basement restrictions up to date with changing flood hazard zones. Department of Public Works By 2022 Standard Ongoing No staff comments were received related to this program's implementation in 2024. Level of Effort and Completion status assumed to be the same as last year.

S2.11.1
Review development standards applicable in areas susceptible to flooding from sea level rise, including east of Highway 101, West Bayshore and East Meadow Circle, the area east of San Antonio Road and north of East Charleston, and implement shoreline development regulations to ensure that new development is protected from potential impacts of flooding resulting from sea level rise and significant storm events. Regulations should be consistent with the Baylands Master Plan, as amended, and may include new shoreline setback requirements, limits on lot line adjustments to avoid the creation of vulnerable shoreline lots, and/or triggers for relocation or removal of existing structures based on changing site conditions and other factors.

Department of Public
Works  By 2022 Significant Ongoing This is still an on going effort. Development standards have not been implemented for flooding due to sea level rise
S2.11.2
Study appropriate restrictions on underground construction in areas outside of flood zones, as shown on Map S‐5, to accommodate expected higher groundwater levels due to sea level rise and minimize consequent flooding of underground construction.

Department of Public
Works  By 2022 Standard Pending Appropriate  standards and restrictions have not been implemented.

S2.12.1
Work cooperatively with the Santa Clara Valley Water District and the San Francisquito Creek Joint Powers Authority to provide flood protection from high tide events on San Francisco Bay, taking into account the impacts of future sea level rise, to provide one percent (100‐year) flood protection from tidal flooding, while being sensitive to preserving and protecting the natural environment.

Department of Public
Works  Continuous Task Substantial Ongoing The City of Palo Alto continues to work with the project team to plan for projects such as tide gate replacement and levee improvements in anticipation of future sea level rise.

S2.12.2 Work with regional, State, and federal agencies to develop additional strategies to adapt to flood hazards to existing or new development and infrastructure, including support for environmentally sensitive levees.

Department of Public
Works  Continuous Task Standard Ongoing A  horizontal levee enhancement design is complete planning on construction in 2025 S2.13.1 Regularly review and update the Fire Department’s operations, training facilities and programs to ensure consistency with current standards and Best Management Practices. Fire Department Continuous  Task standard ongoing   Study to be completed within 1 year.

S2.13.2 Explore technological tools, such as cameras or remote sensors, to identify smoke or fires and initiate response as quickly as possible. Fire Department By  2022 Significant Partially  complete N5 sensors installed in the WUI area. Policy and procedures for monitoring to be established. Collaboration with Stanford, Woodside and Palo Alto.

Page 28 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
S2.14.1 Regularly review and fund updates to the Palo Alto Foothills Fire Management Plan to ensure consistency with current standards and Best Management Practices. Fire Department 2022 ‐2027 Substantial Ongoing Draft  FFMP submitted by Carol Rice (contractor).

S2.14.2 Implement the Foothills Fire Management Plan to balance conservation of natural resources with reduction of fire hazards especially in open space areas. Fire Department Continuous  Task Substantial Ongoing Draft  FFMP submitted by Carol Rice (contractor).

S2.14.3 Minimize fire hazards by maintaining low density zoning in wildland fire hazard areas. Planning and Development Services  Continuous Task Standard Ongoing This  is an ongoing effort.

S2.14.4 Work collaboratively with other jurisdictions and agencies to reduce wildfire hazards in and around Palo Alto, with an emphasis on effective vegetation management and mutual aid agreements. Fire Department Continuous  Task Significant Ongoing Collaboration  with Stanford University and Woodside Fire on N5 sensor install.

S2.14.5
Consider implementation of CAL FIRE recommended programs in educating and involving the local community to diminish potential loss caused by wildfire and identify prevention measures to reduce those risks.

Fire Department By  2022 Significant Ongoing Contract with FireSafe Council for roadside clearance work. Moving forward with multi year contract with Fire Safe Council for work outlined in FFMP.

S2.15.1 Evaluate measures for optimal service delivery to improve efficiency; develop automatic or mutual aid agreements with other jurisdictions, including Stanford, to improve efficiencies. Fire Department 2022 ‐2027 significant ongoing The department has reviewed its in‐county aid agreements as is actively working with San Mateo agencies to update those agreements. The department is also proposing service delivery modifications this year
S2.15.2 Upgrade fire stations so that all remain fully functional following earthquakes. Fire  Department Continuous  Task significant Ongoing Fire  Station 4 project is going through plan check S2.15.3 Periodically update the Fire Department Standards of Cover document. Fire  Department 2022 ‐2027 significant ongoing   Dept. is updating its strategic plan and proposing service delivery changes.  Once known, the process can be completed.

S2.16.1 Provide public education on fire safety, including wildland and structural fire prevention, evacuation routes and guidelines for clearance of landscaping and other hazards around structures. Fire Department Continuous  Task Standard   ongoing Current programs: Annual WUI informational community meeting, annual Fire Prevention Week Open House, Community Hands only CPR classes
S3.1.1
Continue City permitting procedures for commercial and industrial storage, use, and handling of hazardous materials and regulate the commercial use of hazardous materials that may present a risk of off‐site health or safety effects.

Fire Department Continuous  Task Significant ongoing Added additional Hazmat program staffing including 2 Hazmat Inspectors, 1 Assistant Fire Marshal,  1 Administrative Asst. III
S3.1.2 Minimize the risks of biohazards in Palo Alto, including Level 4 biohazards, by continuing to review and update, as necessary, local regulations regarding use, handling and disposal. Fire Department By  2022 Significant ongoing Added additional Hazmat program staffing including 2 Hazmat Inspectors, 1 Assistant Fire Marshal,  1 Administrative Asst. III
S3.1.3 Strengthen development review requirements and construction standards for projects on sites with groundwater contamination.

Planning and
Development Services
and Department of
By 2022 Standard Ongoing This  is an ongoing effort.

S3.1.4 Establish protocols to monitor the movement of hazardous materials on Palo Alto roadways and respond effectively to spills via established truck and construction routes. Fire Department 2022 ‐2027 Significant pending With  addition of staffing, work on this goal can start in January.

S3.1.5
Work with non‐profit organizations to provide information to the public regarding pesticides and other commonly used hazardous materials, environmentally preferable alternatives, and safe recycling and disposal practices to all user groups.

Fire Department Continuous  Task Standard pending With  addition of staffing, work on this goal can start in January.

S3.1.6 Continue providing regular household hazardous waste collection events at the Palo Alto Regional Water Quality Control Plant and strive to make these programs more convenient and accessible to residents.

Department of Public
Works  Continuous Task Standard Ongoing The City provides input when requested. There are no substantial actions to report currently.

S3.1.7 Continue to allow small quantity generators to dispose of hazardous waste at cost. Department of Public Works  Continuous Task Standard Ongoing Program  continues to be available to small businesses.

Goal S‐3: An environment free of the damaging effects of human‐caused threats and hazardous materials.

Page 29 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
S3.1.8
Continue to educate residents on the proper disposal of pharmaceutical and household hazardous waste.

Encourage proper disposal of medications through pharmacies or drug take‐back programs rather than flushing.

Department of Public
Works  Continuous Task Standard Ongoing Advertising pharmaceutical disposal options and providing locations to residents is a continuous effort.

S3.6.1 Work with the freight industry to monitor the contents of freight trains intersecting Palo Alto for potentially hazardous materials, and to establish accountability for accidents and spills.

Office of Emergency
Services Continuous Task Significant Pending
No accidents or spills occurred during this reporting period.  OES has not established a process to track this action in a meaningful way as yet.  We anticipate having more coordination with freight carriers in the coming year.

S3.6.2 Work with Caltrain and the PAUSD, to educate students and the public on the dangers of rail trespass and the benefits of suicide support services available in Palo Alto.

Community Services
Department Continuous Task Standard Ongoing
No change from previous year reporting. This is an ongoing task. Project Safety Net, now a 501(c)(3) and its partners continue to collaborate and educate the community.  The City remains committed to participating and supporting Project Safety Net and youth mental health.

S3.8.1 Encourage residential and commercial food waste reduction through incentives, educational outreach and programs.

Department of Public
Works  Continuous Task Standard Ongoing This work continues and is increasing as it is a key activity, to approach Zero Waste.  Will expand ordinance requirements to improve diversion of organic waste.

S3.8.2 To the extent allowed by law, use refuse rate structures that incentivize waste reduction. Department of Public Works  Continuous Task Standard Ongoing Will continue to review rates to ensure that this program charges the correct amount for the service.

S3.8.3
Continue to work with CalRecycle and the Department of Toxic Substances Control to develop and promote long‐term solid waste management, such as environmentally responsible recycling programs, composting of food waste and other organics, and citywide electronics and digital hardware recycling efforts.

Department of Public
Works  Continuous Task Standard Ongoing This  work continues and new campaigns are cycled through.

S3.9.1 Periodically review and update the adopted Construction and Debris program. Department of Public Works  Continuous Task Standard Ongoing Monitoring  the new requirement in this area that was adopted in July 2020.

S3.9.2
Educate Palo Alto residents and developers about available incentives to use environmentally friendly deconstruction activities to minimize our carbon footprint, and to save natural resources, as well as space in our landfills.

Department of Public
Works Continuous Task Standard Ongoing This  is an ongoing task.

S3.10.1 Support efforts to enforce extended producer responsibility for solid waste to reduce waste produced from manufacturing, shipping, packaging and the entire life‐cycle of the product. Office of Sustainability Continuous  Task Standard Ongoing This  is an ongoing task.

S3.12.1 Complete an inventory of the City’s digital infrastructure to locate vulnerabilities and gaps in system redundancies and develop recommendations for improved cybersecurity. City of Palo Alto Utilities 2022‐2027 Significant Ongoing This  is an ongoing task.

S3.12.2 Establish criteria for the installation of high security telecommunications technology in new local government projects. City of Palo Alto Utilities 2022‐2027 Substantial Partially  Complete Staff is deploying a pilot to determine how to align the electric grid modernization with fiber‐to‐the‐premises to minimize and streamline engineering design work, pole replacements, noise disruption, and construction activity in the neighborhoods.  The pilot is scheduled to be completed by June 2025.

S3.12.3 Establish a wi‐fi network that will be available to public safety responders and Emergency Service Volunteers in the event of power interruption during an emergency or disaster.

City of Palo Alto Utilities
and Office of Emergency
Services
By 2022 Significant Partially  Complete
OES is moving forward to establish a Amateur Radio Emergency Data Network (AREDN) to provide a limited wi‐fi mesh across the City that ESV members can utilize in a widespread emergency.  This is a multiphased project.  Phase 1 ‐ establishing a network backbone to cover Palo Alto is complete.  Phase 2 ‐ create 4 mesh nodes to provide an limited mesh is underway.  Phase 3 ‐ expand the mesh to additional carrier sites will be initiated in CY25.

This project is moving forward while a more comprehensive and dedicated public safety wife network is considered.

Goal T‐1: Create a sustainable transportation system, complemented by a mix of land uses, that emphasizes walking, bicycling, use of public transportation, and other methods to reduce greenhouse gas emissions and the use of single occupancy motor vehicles.

Transportation Element

Page 30 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
T1.2.1
Create a long‐term education program to change the travel habits of residents, visitors, shoppers, and workers by informing them about transportation alternatives, incentives, and impacts. Work with the PAUSD and with other public and private interests, such as the Chamber of Commerce and Commuter Wallet partners, to develop and implement this program.

Office of Transportation Continuous Task Standard Partially  Complete OOT staff is hired and focusing on grant‐funded bicycle safety work and micro mobility program.

T1.2.2 Advocate for improved connectivity to transit to serve workers who live in the South Bay and work in Palo Alto. Office of Transportation Continuous Task Standard Ongoing This is an ongoing effort by city staff and council members appointed to various boards and commissions. City staff successfully requested that Measure B funding for innovative transit be allowed to fund continuing programs and not just the launch of these programs.

T1.2.3
Formalize TDM requirements by ordinance and require new developments above a certain size threshold to prepare and implement a TDM plan to meet specific performance standards. Require regular monitoring/reporting and provide for enforcement with meaningful penalties for non‐compliance. The ordinance should also:
‐Establish a list of effective TDM measures that include transit promotion, prepaid transit passes, commuter checks, car sharing, carpooling, parking cash‐out, bicycle lockers and showers, shuttles to Caltrain, requiring TMA membership and education and outreach to support the use of these modes. ‐Allow property owners to achieve reductions by contributing to citywide or employment district shuttles or other proven transportation programs that are not directly under the property owner’s control. ‐Provide a system for incorporating alternative measures as new ideas for TDM are developed. ‐Establish a mechanism to monitor the success of TDM measures and track the cumulative reduction of peak hour motor vehicle trips. TDM measures
should at a minimum achieve the following: reduction in peak hour motor vehicle trips, with a focus on single‐occupant vehicle trips. Reductions should be based on the rates included in the Institute of Transportation Engineers’ Trip Generation Manual for the appropriate land use category and size:
45 percent reduction in the Downtown district
35 percent reduction in the California Avenue area
30 percent reduction in the Stanford Research Park
30 percent reduction in the El Camino Real Corridor
20 percent reduction in other areas of the city
‐Require new development projects to pay a Transportation Impact Fee for all those peak‐hour motor vehicle trips that cannot be reduced via TDM measures. Fees collected would be used for capital improvements aimed at reducing vehicle trips and traffic congestion. ‐Ensure a stable, sustained funding source to support implementation of TDM measures.

Office of Transportation By 2022 Significant Partially  Complete Newly recruited OOT staff is focusing on grant‐funded bicycle safety work and micro mobility program.

T1.2.4
Evaluate the performance of pilot programs implemented by the Palo Alto Transportation Management Association and pursue expansion from Downtown to California Avenue and other areas of the city when appropriate.

Office of Transportation Continuous Task Standard   Ongoing The City Council receives Palo Alto Transportation Management Association Annual Reports. For FY25, Council allocated $200K to the TMA for outreach citywide.

T1.2.5 Site City facilities near high‐capacity transit and revise existing regulations, policies, and programs to encourage telecommuting, satellite office concepts, and work‐at‐home options.

Planning and
Development Services,
Office of Transportation
& Human Resources
Continuous Task Standard Partially  Complete No staff comments were received related to this program but staff did provide updated level of effort rating and completion status info.

T1.2.6 Pursue full participation of Palo Alto employers in the TMA. Office  of Transportation Continuous Task Significant Ongoing No change, where appropriate, Planning and Development Services includes Transportation Management Association (TMA) membership in development conditions.

The TMA conducts ongoing outreach to employers, and the TMA's mode shift survey now doubles as an outreach tool.

T1.3.1 Develop an electric vehicle promotion program that identifies policy and technical issues, barriers and opportunities to the expansion of electric vehicles. Office of Sustainability 2022 ‐2027 Significant Ongoing This program is ongoing in conjunction with City of Palo Alto Utilities and Office of Transportation. Staff are currently developing an E‐mobility Strategic Plan that include electric vehicles.

Page 31 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
T1.3.2
Use low‐emission vehicles for the Palo Alto Free Shuttle and work with transit providers, including SamTrans and VTA, to encourage the adoption of electric, fuel cell or other zero emission vehicles. Also work with private bus and shuttle providers, delivery companies, and ride services.

Office of Transportation 2022‐2027 Substantial Partially  complete The on‐demand transit service vendor is currently operating electric and hybrid vehicles in Palo Alto.

T1.4.1 Update the Zoning Code to ensure compatibility with the electric vehicle infrastructure requirements. Planning and Development Services Continuous Task N/A Complete
T1.4.2
Periodically review requirements for electric and plug‐ in vehicle infrastructure in new construction.

Consider and periodically review requirements for electric and plug‐in infrastructure for remodels.

Consider costs to the City, including identifying payment options.

Office of Sustainability
and City of Palo Alto
Utilities Department
Continuous Task Standard Ongoing This program is ongoing in conjunction with City of Palo Alto Utilities and Planning & Development.

T1.6.1
Collaborate with transit providers, including Caltrain, bus operators and rideshare companies, to develop first/last mile connection strategies that boost the use of transit and shuttle service for local errands and commuting.

Office of Transportation By 2022 Standard   Partially complete The on‐demand transit service vendor is currently operating electric and hybrid vehicles in Palo Alto. While staff have received grant funding to convert the remaining hybrid vehicles to electric, long‐term funding of this service has not been identified.

T1.6.2 Continue to work with Caltrain, Amtrak, and public bus operators to expand bicycle storage on public transit vehicles and at transit hubs during both peak and off‐peak hours. Office of Transportation Continuous Task Standard Ongoing No  updates to report at this time.

T1.11.1
Collaborate with Stanford University, VTA, Caltrain and other agencies to pursue improvements to the Palo Alto Transit Center area aimed at enhancing pedestrian experience and improving circulation and access for all modes, including direct access to El Camino Real for transit vehicles.

Office of Transportation Continuous Task Substantial Ongoing VTA is leading a project and coordinating with other transit partners in developing a master plan for the Transit Master Plan. The plan is in preliminary stage to develop the scope of work. In addition, Stanford is working on a ballot measure for securing land titles to construct direct access between El Camino Real and Bus Terminal. The Quarry Road Extension project was passed by the voters. See
https://www.cityofpaloalto.org/Departments/Transportation/Transportation‐ Projects/Quarry‐Road‐Transit‐Connection‐at‐El‐Camino‐Park T1.11.2
In collaboration with Caltrain and Stanford Research Park, pursue expansion of service to the California Avenue Caltrain Station and creation of an enhanced transit center at the Station, including connections to VTA bus service, the Palo Alto Free Shuttle, the Marguerite, and other private shuttles serving the Research Park.

Office of Transportation 2022‐2027 Substantial Pending No updates to report at this time. In the long term, a California Ave Transit Center plan is needed to address this program.

T1.12.1 Strongly recommend that VTA maintain existing service and coverage levels in Palo Alto. Office  of Transportation Continuous Task Standard   Ongoing VTA's 2025 Transit Service Plan provides roughly the same frequency and coverage as 2024, with some adjustments for less productive routes.

T1.12.2 Work with VTA to expand VTA express bus service routes to serve the Stanford Research Park, California Avenue, Stanford University, and Downtown. Office of Transportation By 2022 Significant Ongoing No  change to report.

T1.12.3
Work with VTA to study the feasibility of, and if warranted provide, traffic signal prioritization for buses at Palo Alto intersections, focusing first on regional transit routes. Also, advocate for bus service improvements on El Camino Real such as queue jump lanes and curbside platforms.

Office of Transportation  By 2022 Significant Ongoing
Caltrans will initiate a Comprehensive Multimodal Corridor Plan for El Camino Real in the coming months, and will include VTA and local jurisdictions. This plan will include transit, biking, walking, and vehicle considerations. Transit signal priority, bus boarding islands, and queue jump lanes are likely strategies to be included.

T1.13.1 Investigate a pilot program to subsidize a taxi, rideshare, or transit program for Palo Altans to get to/from downtown, including offering education and incentives to encourage users. Office of Transportation 2022‐2027 Standard Ongoing The pilot on‐demand transit service vendor is currently operating electric and hybrid vehicles in Palo Alto and offers fare incentives. While staff have won grant funds to convert the fleet to all‐electric vehicles, long‐term funding of this service has not been identified.

The Transportation Management Association (TMA) continues to subsidize ridesharing and transit for downtown service workers.

Page 32 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
T1.14.1
Evaluate the shuttle system in collaboration with community members, people with special needs, and PAUSD to:
‐Evaluate current routes and ridership;
‐Identify potential service improvements, including new or modified routes; expanded schedules that accommodate daytime, evening, and weekend demand; facilitating transit connections, and improvements to the safety and appearance of shuttle stops; ‐Explore partnerships with other services that could complement and supplement the Palo Alto Shuttle; ‐Develop clear and engaging materials to explain and promote shuttle use with the purpose of reducing barriers to use; and
‐Establish a schedule for regular evaluation and reporting to optimize shuttle system use and effectiveness.

Office of Transportation Continuous Task Substantial Ongoing The on‐demand transit service vendor is currently operating electric and hybrid vehicles in Palo Alto. This pilot project provides transit service to most of Palo Alto on weekdays from 7am to 7pm.  While staff won grant funding to convert to an all‐electric fleet, long‐term funding of this service has not been identified.

T1.16.1 Continue regular surveys of bicycle use across the city, by collecting bicycle counts on important and potential bicycle corridors. Office of Transportation Continuous Task Significant Ongoing Ongoing as part of City of Palo Alto's  Bicycle + Pedestrian Transportation Plan (BPTP) implementation.

T1.16.2 Consider marketing strategies such as a recurring Palo Alto Open Streets program of events, potentially in coordination with local business groups, which would include street closures and programming. City Manager’s Office 2022 ‐2027 Significant Partially  complete No change from last year's reporting. Staff continues to send a digital welcome message to new residents and finalized a new welcome message that is both digital and in print formats. The City's website, provides  a comprehensive look at resident related information. The website includes a digital welcome packet and new resident resources are now available both at www.cityofpaloalto.org/residents and a new "My Neighborhood" map that highlights services available near a resident's home at www.cityofpaloalto.org/residents/my‐neighborhood
T1.16.3 Encourage private schools to develop Walk and Roll Maps as part of Transportation Demand Management strategies to reduce vehicle trips. Office of Transportation Continuous Task Standard Ongoing This is an ongoing effort. Gideon Hausner Jewish Day School developed their own map in 2014.

T1.16.4
Participate in local and regional encouragement events such as Palo Alto Walks and Rolls, Bike to Work Day, and Bike Palo Alto! that encourages a culture of bicycling and walking as alternatives to single occupant vehicle trips.

Office of Transportation 2022‐2027 Standard Ongoing Coordination  with City staff and various event sponsors is ongoing.

T1.19.1
Adjust the street evaluation criteria of the City's Pavement Management Program to ensure that areas of the road used by bicyclists are maintained at the same standards as, or at standards higher than, areas used by motor vehicles. Include bicycle and e‐bike detection in intersection upgrades.

Department of Public
Works  2022‐2027 Standard Ongoing
City‐wide street surveys are completed biennially and include pavement inspections of bike lanes and bike boulevards. Installation of video detection equipment is included with street maintenance projects when
appropriate.

T1.19.2
Prioritize investments for enhanced pedestrian access and bicycle use within Palo Alto and to/from surrounding communities, including by incorporating improvements from related City plans, for example the 2012 Bicycle + Pedestrian Transportation Plan and the Parks, Trails & Open Space Master Plan, as amended, into the Capital Improvements Program.

Department of Public
Works  Continuous Task Substantial Ongoing This  program is ongoing. There are no substantial actions to report at this time.

T1.19.3 Increase the number of east‐west pedestrian and bicycle crossings across Alma Street and the Caltrain corridor, particularly south of Oregon Expressway.

Department of Public
Works  After 2027 Substantial Partially  Complete The project to determine the location of two bike/pedestrian crossings of the rail corridor south of Oregon Expressway began in September 2024.

T1.19.4 Encourage the use of bike sharing, and the provision of required infrastructure throughout Palo Alto, especially at transit stations and stops, job centers, community centers, and other destinations. Office of Transportation Continuous Task Standard Partially  Complete Newly recruited OOT staff is focusing on grant‐funded bicycle safety work and micro mobility (bikeshare/e‐scooter) program.

Page 33 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
T1.19.5
Improve amenities such as seating, lighting, bicycle parking, street trees, public art, and interpretive stations along bicycle and pedestrian paths and in City parks to encourage walking and cycling and enhance the feeling of safety.

Office of Transportation
and Department of
Public Works
Continuous Task Substantial Ongoing There  are no substantial actions to report at this time. Ongoing as opportunities arise.

T1.22.1 Collect, analyze and report transportation data through surveys and other methods on a regular basis.

Track progress on build‐out of the 2012 Bicycle + Pedestrian  Transportation Plan network. Office of Transportation Continuous Task Significant Ongoing This  program is ongoing. There are no updates to report at this time.

T1.25.1
As part of the effort to reduce traffic congestion, regularly evaluate the City’s current Transportation Impact Fee and modify as needed to implement transportation infrastructure improvements.

Modifications to the impact fee program should be structured in keeping with the City’s desire to require new development to reduce peak hour motor vehicle contributions to the provision of transit services, shuttles, carpool/ rideshare incentives, and similar programs.

Office of Transportation Continuous Task Standard Ongoing No  updates to report at this time.

T1.26.1 In collaboration with regional agencies and neighboring jurisdictions, identify and pursue funding for rail corridor improvements and grade separation. Office of Transportation  By 2022 Significant Ongoing Executed a funding agreement with FRA for $6.0 Million funding for Preliminary Engineering and Environmental Phase for Churchill Avenue, Meadow Drive, & Charleston Road Grade Separations. In addition City was awarded a $23.79 Million for final design for the same crossings.

T2.1.1 Implement computerized traffic management systems to improve traffic flow when feasible. Office  of Transportation Continuous Task Substantial Ongoing Intend  to be partial to mostly complete by end of 2024.

T2.1.2 Implement a program to monitor, coordinate, and optimize traffic signal timing a minimum of every two years along arterial and residential arterial streets. Office of Transportation Continuous Task Significant   Ongoing Numerous projects in process.  On‐going monitoring is limited and subject to staffing availability
T2.2.1
Work in partnership with the Palo Alto TMA and Stanford University to aggregate data and realize measurable reductions in single‐occupant vehicle commuting to and from Downtown and in the Stanford Research Park.

Office of Transportation Continuous Task Significant Ongoing This program is ongoing. For FY25, Council allocated to the TMA $200K for citywide outreach.

T2.3.1
When adopting new CEQA significance thresholds for VMT for compliance with SB 743 (2013), adopt standards for vehicular LOS analysis for use in evaluating the consistency of a proposed project with the Comprehensive Plan, and also explore desired standards for MMLOS, which includes motor vehicle LOS, at signalized intersections.

Office of Transportation  By 2022 Significant Pending No  updates to report at this time.

T2.4.1 Revise protocols for reviewing office, commercial, and multi‐family residential development proposals to evaluate multimodal level of service and identify gaps in the low stress bicycle and pedestrian network. Office of Transportation By 2022 Standard   Pending Methodologies for Multimodal Level of Service (MMLOS) are neither standardized nor widely used. Level of stress analysis of the bicycle and pedestrian network is anticipated in the current update of the Bicycle and Pedestrian Transportation Plan. This analysis will inform development review by staff.

T3.5.1
Continue to use best practices in roadway design that are consistent with complete streets principles and the Urban Forest Master Plan, focusing on bicycle and pedestrian safety and multi‐modal uses. Consider opportunities to incorporate best practices from the National Association of City Transportation Officials guidelines for urban streets and bikeways, tailored to the Palo Alto context.

Office of Transportation
& Department of Public
Works
By 2022 Significant   Ongoing No  updates to report at this time.

T3.5.2 Establish procedures for considering the effects of street design on emergency vehicle response time.

Department of Public
Works & Palo Alto
Police Department &
Continuous Task Standard Ongoing No  changes.

T3.10.1 Support increased public transit, traffic management and parking solutions to ensure safe, convenient access to and from the Stanford Shopping Center/ Medical Center area. Office of Transportation  Continuous Task Substantial Ongoing The  Quarry Road Extension project was approved by the voters.

Goal T‐3: Maintain an efficient roadway network for all users.

Goal T‐2: Decrease delay, congestion, and vehicle miles travelled with a priority on our worst intersections and our peak commute times, including school traffic.

Page 34 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
T3.10.3
Provide safe, convenient pedestrian, bicycle, and transit connections between the Stanford Shopping Center/Medical Center areas and housing along the Sand Hill Road/Quarry Road corridors to Palo Alto Transit Center, Downtown Palo Alto, and other primary destinations.

Office of Transportation Continuous Task Substantial Partially  Complete The  Quarry Road Extension project was approved by the voters.

T3.10.4
Pursue extension of Quarry Road for transit, pedestrians and bicyclists to access the Palo Alto Transit Center from El Camino Real. Also study the feasibility of another pedestrian and bicycle underpass of Caltrain at Everett Street. Office of Transportation  2022‐2027 Significant Partially  Complete The  Quarry Road Extension project was approved by the voters.

T3.15.1
Undertake studies and outreach necessary to advance grade separation of Caltrain to become a “shovel ready” project and strongly advocate for adequate State, regional, and federal funding for design and construction of railroad grade separations.

Office of Transportation  By 2022 Substantial ongoing
Staff completed the additional studies, including updates to the plans, profiles, sections, and renderings for the Rail Committee and the City Council Review. The Rail Committee reviewed and recommended the City Council for elimination of Trench Alternatives at Meadow and Charleston Road crossings. The City Council reviewed and directed staff to initiate Preliminary Engineering and Environmental Phase with Partial Underpass Alternative and bike/ped undercrossing at Seale Ave as preferred alternative and Closure as backup alternative. For Meadow and Charleston, city council directed to move forward the underpass and hybrid options to review in early phase of PE & Environmental.

T3.15.2 Conduct a study to evaluate the implications of grade separation on bicycle and pedestrian circulation. Office  of Transportation By 2022 Significant Ongoing Staff presented to the Rail committee on the alternative location of crossings for Churchill Underpass option. Rail Committee after review of the crossings recommended Council to select Seale Avenue crossing. The Council at the June 10th meeting selected and directed staff to pursue the Seale Avenue Crossing for Churchill Partial Underpass alternative.

T3.17.1 Complete a Palo Alto Avenue crossing study to identify potential near‐term safety and accessibility improvements. Office of Transportation By 2022 Significant Ongoing The conceptual plans for the improvements required for implementing quiet zone at this location were completed. Staff is working on completing the final plans and seek permits to construct necessary improvements.

T3.17.2 Work with Caltrain to ensure that the rail tracks are safe and secure with adequate fencing and barriers. Office  of Transportation  By 2022 Standard Ongoing Staff worked with Caltrain to develop the project plans for enhanced fencing to replace existing 7 feet fencing with 9 feet fencing with winglet between Churchill Avenue and Palo Alto Station. Caltrain has completed the project design and currently working on the procurement of the contractor services to construct these improvements.

T4.2.1 Periodically evaluate residential areas for traffic impacts and use the results of that evaluation to prioritize traffic calming measures. Office of Transportation Continuous Task Standard Ongoing Staff  evaluates traffic calming requests on first come first serve bases.

T4.4.1 Use landscaping and other improvements to establish clear “gateways” at the points where the Oregon Expressway, University Avenue and Embarcadero Road transition from freeways to neighborhoods.

Department of Public
Works  After 2027 Substantial Ongoing This  is an ongoing effort. There are no substantial actions to report at this time.

T3.10.2 Implement and monitor Development Agreement traffic mitigations at Stanford Medical Center. Office  of Transportation Continuous Task Standard Ongoing We received the 23‐24 Annual Mode Share Report on time, results get incorporated into a Annual Report for Council. SUMC did not meet 2024 goals, but fees only apply if they also do not meet 2025 goals.

T5.1.1
Evaluate the need to update parking standards in the municipal code, based on local conditions, different users’ needs and baseline parking need. Allow the use of parking lifts for Office/R&D and multifamily housing as appropriate.

Planning and
Development Services
and Office of
Transportation
By 2022 Standard Ongoing Additional recommendations will be presented along with the development of a commercial pilot process. Parking lifts are allowed for office, R&D and multifamily projects.

Goal T‐4: Protect local streets that contribute to neighborhood character and provide a range of local transportation options.

Goal T‐5: Encourage attractive, convenient, efficient and innovative parking solutions for all users.

Page 35 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
T5.1.2 Consider reducing parking requirements for retail and restaurant uses as a way to encourage new businesses and the use of alternative modes.

Planning and
Development Services 2022‐2027 Significant Partially  Complete Council Ad Hoc has requested additional parking  study that may inform next steps as part of retail revitalization efforts.

T5.1.3 Work with stakeholders in each commercial center and employment district to monitor conditions and determine the appropriate timing for revisions to parking requirements.

Planning and
Development Services
and Office of
Transportation
2022‐2027 Standard Partially  Complete Retail revitalization efforts and preliminary Downtown Housing Plan work are advancing this program.

T5.1.4
Study the feasibility of unbundled parking for office, commercial, and multi‐family residential developments (including senior housing developments) that are well‐ served by transit and demonstrated walking and biking connections.

Planning and
Development Services
and Office of
Transportation
By 2022 Standard Partially  Complete Preliminary Downtown Housing Plan and Housing Incentive Program work may advance this program.

T5.1.5
Consider reducing parking requirements for multi‐ family uses as a way to encourage new multi‐family housing and the use of alternative modes, where reduction in parking would not impact the neighborhood.

Planning and
Development Services By 2022 Standard Partially  Complete The Housing Incentive Program and Affordable Housing Incentive Program updates are underway and a recommendation to City Council from the Planning and Transportation Commission on code amendments are anticipated before the end of 2024. The efforts include consideration of appropriate parking standards.

T5.2.1 Use technology to help identify parking availability and make it easy to pay any parking fees. Office  of Transportation By 2022 Substantial Partially  Complete Staff and a consultant will present in December 2024 options for improved permit and fee payment options.

T5.2.2
Study and implement pricing strategies for public parking in commercial districts, taking into consideration both employee parking demand and the needs of retailers and customers. Use pricing to encourage short term parking on street, long term parking in parking garages, and the use of alternative modes of transportation
Office of Transportation Continuous Task Significant Partially  Complete Staff will present in December 2024 options for a pilot curb management pricing strategies in select Downtown parking facilities, on‐street and in select city‐owned parking lots.

T5.2.3
Implement Council‐adopted recommendations from the parking management study for the Downtown area, which address the feasibility of removing color‐ coded parking zones, and dynamic pricing and management policies to prioritize short‐term parking spaces closest to the commercial core for customers, garage parking for employees, and neighborhood parking for residents.

Office of Transportation By 2022 Substantial Partially  Complete Staff will present in December 2024 next steps for potential curb management strategies in select Downtown parking facilities, on‐street and in select city‐owned parking lots.

T5.4.1
Explore incentives to encourage privately initiated shared parking among individual property owners when developments have excess parking that can be available for other businesses to use. Office  of Transportation By 2022 Standard Pending Work  has not commenced.

T5.8.1
Study the feasibility of retrofitting City‐owned surface parking lots to implement best management practices for stormwater management and urban heat island mitigation, including green infrastructure, permeable pavement and reflective surfaces.

Department of Public
Works  By 2022 Significant Ongoing This  is an ongoing program. There are no substantial actions to report at this time.

T5.8.2
Identify incentives to encourage the retrofit of privately owned surface parking areas to incorporate best management practices for stormwater management and urban heat island mitigation as well as incentives for the provision of publicly accessible pavement and reflective surfaces.

Department of Public
Works  By 2022 Standard Ongoing This  is an ongoing program, no updates to report at this time.

T5.8.3 Update City requirements regarding trees and other landscaping that capture and filter stormwater within surface parking lots to take advantage of new technology.

Department of Public
Works  Continuous Task Standard Ongoing This  is an ongoing program. There are no substantial actions to report at this time.

T5.11.1 Coordinate with neighborhood groups and local businesses and other stakeholders to evaluate the need for a residential parking permit program in areas without existing programs. Office of Transportation By 2022 Significant Ongoing This  is an ongoing program. There are no substantial actions to report at this time.

T5.12.1
Work with employers, merchants, schools, and community service providers, to identify ways to provide more bicycle parking, including e‐bike parking with charging stations, near existing shops, services and places of employment.

Office of Transportation Continuous Task Standard   Ongoing This is an ongoing program via 311 requests for parking in the public Right‐of‐Ways and through coordination with the Safe Routes to School program.

Page 36 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
T5.12.2 Install secure electronic bike lockers such as the BikeLink system, at high theft locations, including transit stations and parking garages. Office of Transportation 2022‐2027 Significant Pending Work  has not commenced.

T5.12.3 Assess the need to provide additional bicycle parking in City‐owned parking lots and rights‐of‐way. Office  of Transportation 2022‐2027 Significant Ongoing This  is an ongoing program via 311 requests for parking in the public Right‐of‐Ways.

T6.1.1
Follow the principles of the safe routes to schools program to implement traffic safety measures that focus on Safe Routes to work, shopping, downtown, community services, parks, and schools, including all designated school commute corridors.

Office of Transportation Continuous Task Significant Ongoing Bicycle network planning has commenced with the current update of the Bicycle and Pedestrian Transportation Plan. In addition, a roadway safety plan funded by a federal grant and currently under development, will identify systemic transportation network changes to improve safety for all road users.

T6.1.2
Develop, distribute and aggressively promote maps and apps showing safe routes to work, shopping, community services, parks and schools within Palo Alto in collaboration with stakeholders, including PAUSD, major employers, TMAs, local businesses and community organizations.

Office of Transportation Continuous Task Significant Ongoing This is an ongoing program. A Palo Alto bike route map is posted on the City website.

School Walk and Roll Maps and the Walk and Roll to Libraries Map are posted online, updated as needed, and distributed at libraries, schools, and community events.

T6.1.3 Address pedestrian safety along Alma Street between Embarcadero Road and Lytton Street. Office  of Transportation By 2022 Significant Pending Work  has not commenced.

T6.1.4 Address pedestrian safety on shared‐use paths through the use of signs, pavement markings, and outreach to users, encouraging them to be safe and courteous. Office of Transportation Continuous Task Standard   Ongoing This  is an ongoing program, no updates to report at this time.

T6.2.1
Regularly collect severity and location data on roadway collisions for all modes of travel, including fatalities and severe injuries, and use this data to make roadway design decisions. In collaboration with Santa Clara County, develop an up‐to‐date, public database for this information.

Office of Transportation Continuous Task Standard Ongoing This  is an ongoing program via the County's collision database.

T6.4.1
Consider the Adopted School Commute Corridors Network and adopted “Walk and Roll” maps when reviewing development applications and making land use and transportation planning decisions.

Incorporate these requirements into City code when feasible.

Office of Transportation Continuous Task Standard   Ongoing This  is an ongoing program, no updates to report at this time.

T6.4.2 Establish standards and procedures for maintaining safe bicycling routes, including signage for warnings and detours during construction projects. Office of Transportation Continuous Task Standard   Ongoing The  Traffic Control Plan Guidelines were updated in 2016 and are regularly reviewed.

T6.4.3 In collaboration with PAUSD, provide adult crossing guards at school crossings that meet established warrants. Police Department Continuous  Task Significant Ongoing Two  intersections added to the contract this year per Council direction.

T6.6.1
Periodically evaluate safety on roadways and at intersections and enhance conditions through the use of signal technology and physical changes. Consider the construction of traffic circles for improved intersection safety.

Office of Transportation Continuous Task Substantial Ongoing The Safe Streets for All Safety Action Plan currently under development will provide strategies for eliminating traffic‐related deaths and serious injuries by a target date to be chosen by Council.

T6.6.2
Continue to provide educational programs for children and adults, in partnership with community‐based educational organizations, to promote the safe walking and safe use of bicycles, including the City‐ sponsored bicycle education programs in the public schools and the bicycle traffic school program for juveniles.

Office of Transportation Continuous Task Significant Ongoing This  is an ongoing program, no updates to report at this time.

T6.6.3
Work with PAUSD and employers to promote roadway safety for all users, including motorized alternatives to cars and bikes such as mopeds and e‐bikes, through educational programs for children and adults.

Office of Transportation Continuous Task Significant Ongoing This  is an ongoing program, no updates to report at this time.

T6.6.4 Complete a mobility and safety study for downtown Palo Alto, looking at ways to improve circulation and safety for all modes. Office of Transportation 2022‐2027 Significant Partially  Complete The City began the development of a new federally funded Safe Streets for All (SS4A) Safety Action Plan in August of 2023 to identify systemic transportation network changes to improve safety for all road users.

Goal T‐6: Provide a safe environment for motorists, pedestrians, and bicyclists on Palo Alto streets.

Page 37 of 38 ends

Program
Number Program Text Lead   Department
Target
Completion Date
at Comp Plan
Adoption
2024 Level of
Effort to
Complete
2024 Completion
Status
(as of December
31, 2024)
Staff Comments 2024
T6.6.5 Identify and construct safety improvements for pedestrian underpasses, including on Embarcadero Road. Office  of Transportation After 2027 Substantial Pending Work  has not commenced.

T6.6.6 Improve pedestrian crossings by creating protected areas and better pedestrian and traffic visibility. Use a toolbox including bulb outs, small curb radii, high visibility crosswalks, and landscaping. Office of Transportation Continuous Task Substantial Ongoing The City began the development of a new federally funded Safe Streets for All (SS4A) Safety Action Plan in August of 2023 to identify systemic transportation network changes to improve safety for all road users. it includes a toolbox of roadway safety strategies.

T6.6.7 Establish a program to educate residents to keep sidewalks clear of parked cars, especially on narrow local streets in neighborhoods with rolled curbs. Survey for compliance annually. Office of Transportation 2022‐2027 Significant Pending Work  has not commenced. A rolled curb parking flyer is available on the City website.

T6.7.1 Evaluate the performance of safety improvements and identify methods to encourage alternative transportation modes. Office of Transportation Continuous Task Standard   Ongoing This  is an ongoing program, no updates to report at this time.

T7.1.1
Expand transportation opportunities for transit‐ dependent riders by supporting discounts for taxi fares, rideshare services, and transit, by coordinating transit systems to be shared by multiple senior housing developments, and by maintaining a database of volunteer drivers, and other transit options.

Office of Transportation 2022‐2027 Significant Partially  Complete The on‐demand transit service vendor is currently operating electric and hybrid vehicles in Palo Alto and offers fare discounts for the disabled, seniors, youth, low‐income, and wheelchair users. This pilot project provides transit service to most of Palo Alto on weekdays from 7am to 7pm.  While staff have won grant funding to convert to an all‐ electric fleet, long‐term funding of this service has not been identified.

T7.1.2
Coordinate with social service agencies and transit agencies to fill gaps in existing transportation routes and services accessible to transit‐dependent riders no matter their means and design new bus routes that enable them to access those services.

Office of Transportation Continuous Task Substantial Ongoing The on‐demand transit service vendor is currently operating electric and hybrid vehicles in Palo Alto and offers fare discounts for the disabled, seniors, youth, low‐income, and wheelchair users. This pilot project provides transit service to most of Palo Alto on weekdays from 7am to 7pm.  While staff have won grant funding to convert to an all‐ electric fleet, long‐term funding of this service has not been identified.

T7.1.3 Pursue expanded evening and night time bus service to enhance mobility for all users during off‐peak times. Office of Transportation Continuous Task Standard   Pending This program is unlikely to be pursued with VTA's 2025 New Service Plan as post‐pandemic transit funding is limited.

T8.1.1 Continue to participate in regional efforts to develop technological solutions that make alternatives to the automobile more convenient. Office of Transportation  Continuous Task Standard   Ongoing The  Dumbarton Forward Project is in construction by AC Transit.

T8.3.1
Advocate for provision of a new southbound entrance ramp to Highway 101 from San Antonio Road, in conjunction with the closure of the southbound Charleston Road on‐ramp at the Rengstorff Avenue interchange in Mountain View.

Office of Transportation By 2022 Standard   Ongoing With grant funding, VTA is leading work effort to identify and analyze project alternatives.

Public engagement is forthcoming.

T8.7.1 Work with regional transportation providers to improve connections between Palo Alto and the San Francisco International Airport and Norman Y. Mineta San Jose International Airport. Office of Transportation Continuous Task Standard   Pending No  Updates to Report T8.8.1
Identify and improve bicycle connections to/from neighboring communities in Santa Clara and San Mateo counties to support local trips that cross city boundaries. Also advocate for reducing barriers to bicycling and walking at freeway interchanges, expressway intersections, and railroad grade crossings. Office of Transportation  Continuous Task Substantial Ongoing This will be addressed in the ongoing Bicycle and Pedestrian Transportation Plan Update that is expected to conclude in 2025.

Source: City of Palo Alto, Planning and Development Services, January 2025 Goal T‐8: Influence the shape and implementation of regional transportation policies and technologies to reduce traffic congestion and greenhouse gas emissions.

Goal T‐7: Provide mobility options that allow people who are transit dependent to reach their destinations.

Page 38 of 38 ends