Cities Index.
Attachment A - Exchange Agreement Between City of Palo Alto and Midpeninsula Regional Open Space District

Palo Alto City Council
June 2, 2025

Document
Attachment A - Exchange Agreement Between City of Palo Alto and Midpeninsula Regional Open Space District
Meeting
June 2, 2025
Body
Palo Alto City Council
Pages
9
Original file
25.3 MB
Text extracted from the city's file for reading and search. Open the original on cityofpaloalto.primegov.com. That file is the official record.
Page 1 of 7 ends

EXCHANGE AGREEMENT

BETWEEN CITY OF PALO ALTO AND MIDPENINSULA REGIONAL OPEN SPACE

DISTRICT
This exchange agreement (hereinafter, "Agreement") is made as of (“Effective Date”) by and between the Midpeninsula Regional Open Space District, a California special district (hereinafter "District"), and City of Palo Alto, a California chartered municipal corporation (hereinafter “City”), each of whom may be referred to individually as a “Party” and collectively as the “Parties.”

RECITALS
WHEREAS, the District is the owner of certain real property situated in the unincorporated County of Santa Clara, State of California, within Monte Bello Open Space Preserve and Rancho San Antonio Open Space Preserve, Assessor’s Parcel Numbers 351-25-014, 351-06-025, 351-09- 002 and 351-12-069, as depicted in Exhibit A attached hereto and incorporated herein by this reference (the “District Property”); and
WHEREAS, the City holds right-of-way and utility easements for electric distribution lines across the District Property, as assigned by Pacific Gas and Electric Company from Louis Oneal, Inc. (“Easement 1”), Bertha Hayes (“Easement 2”), and George Morell (“Easement 3”), which are attached hereto as Exhibit B and incorporated herein by this reference (collectively, the “Existing Utility Easements”); and
WHEREAS, the City has determined that its utility service territory west of Interstate 280, including the District Property, has an elevated risk of wildfire and therefore seeks to perform a project to convert its overhead utility facilities to underground utility facilities along Montebello Road within the District Property (the “Project”); and WHEREAS, the City has prepared a plan depicting: (1) the new underground electric distribution and fiber optic communications lines, fixtures and other appurtenances under, across and along Montebello Road as it crosses District Property, and (2) the existing overhead electric utility facilities, lines, poles, fixtures and other appurtenances on the District Property, which plan is attached hereto as Exhibit C and incorporated herein by reference (“Alignment Plan”); and
WHEREAS, the District and City desire to exchange and transfer certain real property interests as set forth in this Agreement; and
WHEREAS, District has determined that said exchange of interests in real property is of equal or greater value to the public and, said exchange has been determined to be in accordance with the District’s enabling legislation set out at Section 5540.5 of the Public Resources Code of the State of California;
NOW, THEREFORE, the parties mutually agree as follows:

1. INCORPORATION OF RECITALS.

Page 2 of 7 ends

The above Recitals and the exhibits attached to this Agreement are hereby incorporated herein and made a part hereof.

2. EXCHANGE AGREEMENT.

The District and City agree to the following exchange of real property interests, to be effective as of the Closing (defined below):
a. Grant of Underground Utility Easements from District to City: District hereby agrees to grant an easement and right of way for the City to construct, maintain, repair, replace and upgrade underground utility facilities and appurtenances thereto under, across and along Montebello Road as it crosses the District Property, in the form of easement agreement set forth in Exhibit D attached hereto and incorporated herein by reference (“Underground Utility Easement”).
b. Abandonment of Existing Utility Easements: City hereby agrees to quitclaim to District all right, title and interest in the Existing Utility Easements and any other rights to overhead utility facilities on District Property, including any rights of way in connection therewith, in the form of quitclaim deed set forth in Exhibit E attached hereto and incorporated herein by reference (“Quitclaim Deed”).

3. LICENSE AGREEMENT.

To allow the City to commence its undergrounding project prior to Closing, the District and City shall execute a license agreement in the form attached hereto as Exhibit F and incorporated herein by reference (“License Agreement”). The District’s acceptance of the Project in accordance with the License Agreement is a condition precedent to Closing.

4. TERM and CLOSING.

This Agreement shall commence on the Effective Date and shall terminate on the date of the Closing. The closing date (“Closing”) shall be the recordation date of the Underground Utility Easement and Quitclaim Deed in Santa Clara County. Following City’s preparation of a legal description and plat map of the Underground Utility Easement by a licensed surveyor, City shall promptly deliver executed copies of the Underground Utility Easement and Quitclaim Deed to District for recording. Within ten (10) business days of the Effective Date, City shall deliver an executed copy of the License Agreement to District. Closing shall occur after the satisfaction of all the following conditions:
a. City shall have completed the installation and commissioning of the underground utility facilities;
b. City shall have decommissioned, removed and disposed of existing overhead utility facilities, lines, poles and related fixtures on the District Property as specified in the License Agreement;
c. City shall have repaired and restored any portion of the District Property damaged or disturbed in carrying out the Project as specified in the License Agreement;

Page 3 of 7 ends

d. District shall have provided written acceptance of the Project, which shall not be unreasonably withheld; and
e. Following District’s acceptance of the Project, City shall have prepared a legal description and plat map of the Underground Utility Easement by a licensed surveyor and provided it to the District for its approval, which approval shall not be unreasonably withheld. Following District’s approval of the legal description and plat map, City shall deliver the plat map and legal description to District to include as part of the recorded Underground Utility Easement.

Within ten (10) business days following completion of the Project and the Parties’ mutual agreement that the above conditions to Closing have been satisfied, the District shall execute and concurrently record the Underground Utility Easement and Quitclaim Deed in Santa Clara County.

5. REPRESENTATIONS AND WARRANTIES.

For the purpose of consummating this exchange of interests in real property contemplated herein, each party represents and warrants to the other party, each of which is material, are being relied upon by the Parties, and shall survive the recording of the property rights being exchanged and conveyed herein.
a. Authority. The Parties have the full right, power and authority to enter into this Agreement and to perform the transactions contemplated hereunder. b. Valid and Binding Agreements. This Agreement and all other documents delivered by the Parties have been or will be duly authorized and executed and delivered by the Parties as legal, valid and binding obligations of the Parties to complete this exchange and conveyance of real property.

6. PAYMENT OF COSTS AND FEES. District shall pay any required recording costs and fees for the Underground Utility Easement and Quitclaim Deed. City shall pay the costs of preparing the legal description and plat map. Each Party shall be responsible for any other costs it incurs in performing this Agreement, unless specified herein to the contrary or otherwise agreed by the Parties in writing.

7. "AS-IS” CONVEYANCE. All Parties are acquiring the respective real property interests on an “As-Is” basis, without warranties, express or implied, regarding the physical condition of the properties to be exchanged. All Parties shall rely on their own inspections of the respective property interests.

8. MISCELLANEOUS PROVISIONS.
a. Choice of Law. The laws of the State of California, regardless of any choice of law principles, shall govern the validity of this Agreement, the construction of its terms and the interpretation of the rights and duties of the Parties.

Page 4 of 7 ends

b. Amendment. The Parties hereto may by mutual written agreement amend this Agreement in any respect.
c. Rights Cumulative. Each and all of the various rights, powers and remedies of the Parties shall be considered to be cumulative with and in addition to any other rights, powers and remedies which the Parties may have at law or in equity in the event of the breach of any of the terms of this Agreement. The exercise or partial exercise of any right, power or remedy shall neither constitute the exclusive election thereof nor the waiver of any other right, power or remedy available to such Party. d. Notice. Whenever any Party hereto desires or is required to give any notice, demand, or request with respect to this Agreement, each such communication shall be in writing and shall be deemed to have been validly served, given or delivered at the time stated below if deposited in the United States mail, registered or certified and return receipt requested, with proper postage prepaid, or if delivered by Federal Express or other private messenger, courier or other delivery service and addressed as indicated as follows:

City: City of Palo Alto
Attn: Utilities Department, Electric Engineering
250 Hamilton Avenue
Palo Alto, CA 94301
TEL: (650) 329-2161
With a copy to:

City of Palo Alto
Attn: Real Property Manager
250 Hamilton Avenue
Palo Alto, CA 94301
District: Midpeninsula Regional Open Space District
Attn: Real Property Manager
5050 El Camino Real
Los Altos, CA 94022-1404
TEL: (650) 691-1200
Service of any such communication made only by mail shall be deemed complete on the date of actual delivery as indicated by the addressee’s registry or certification receipt or at the expiration of the third (3rd) business day after the date of mailing, whichever is earlier in time. Either Party hereto may from time to time, by notice in writing served upon the other as aforesaid, designate a different mailing address or a different person to whom such notices or demands are thereafter to be addressed or delivered. Nothing contained in this Agreement shall excuse either Party from giving oral notice to the other when prompt notification is appropriate, but any oral notice given shall not satisfy the requirements provided in this Section.

Page 5 of 7 ends

e. Severability. If any of the provisions of this Agreement are held to be void or unenforceable by or as a result of a determination of any court of competent jurisdiction, the decision of which is binding upon the parties, the Parties agree that such determination shall not result in the nullity or unenforceability of the remaining portions of this Agreement. The Parties further agree to replace such void or unenforceable provisions, which will achieve, to the extent possible, the economic, business, and other purposes of the void or unenforceable provisions. f. Counterparts. This Agreement may be executed in separate counterparts, each of which shall be deemed as an original, and when executed, separately or together, shall constitute a single original instrument, effective in the same manner as if the parties had executed one and the same instrument. In the event of any disparity between the counterparts produced, the recorded counterpart shall be controlling. g. Waiver. No waiver of any term, provision or condition of this Agreement, whether by conduct or otherwise, in any one or more instances, shall be deemed to be, or be construed as, a further or continuing waiver of any such term, provision or condition or as a waiver of any other term, provision or condition of this Agreement. h. Entire Agreement. This Agreement, including its recitals and exhibits, is intended by the Parties to be the final expression of their agreement; it embodies the entire agreement and understanding between the Parties hereto; it constitutes a complete and exclusive statement of the terms and conditions thereof, and it supersedes any and all prior correspondence, conversations, negotiations, agreements or understandings relating to the same subject matter.
i. Time of the Essence. Time is of the essence of each provision of this Agreement in which time is an element.
j. Survival. All covenants of District or City which are expressly intended hereunder to be performed in whole or in part after the Closing, and all representations and warranties by either Party to the other, shall survive the Closing and be binding upon and inure to the benefit of the respective Parties hereto and their respective heirs, successors and permitted assigns.
k. Terms Run with the Land. The terms, covenants and conditions set out in this Agreement shall run with the land and be binding upon and inure to the benefit of the successors and assigns of the Parties hereto pursuant to California Civil Code Section 1468.
l. Assignment. Except as expressly permitted herein, neither Party to this Agreement shall assign its rights or obligations under this Agreement to any third party without the prior written approval of the other Party.
m. Further Documents and Acts. Each of the Parties hereto agrees to execute and deliver such further documents and perform such other acts as may be reasonably necessary or appropriate to consummate and carry into effect the transactions described and contemplated under this Agreement.

Page 6 of 7 ends

n. Captions. Captions are provided herein for convenience only and they form no part of this Agreement and are not to serve as a basis for interpretation or construction of this Agreement, nor as evidence of the intention of the Parties hereto. o. Pronouns and Gender. In this Agreement, if it be appropriate, the use of the singular shall include the plural, and the plural shall include the singular, and the use of any gender shall include all other genders as appropriate.

Space intentionally left blank

Path: G:\Projects\a_Districtwide\Easements\Easements.aprxCreated By: acostanza While the District strives to use the best available digital data, these data do not represent a legal survey and are merely a graphic illustration of geographic features.

Midpeninsula Regional
Open Space District
(Midpen)
4/3/2025
0 0.250.125
Miles
I
Proposed underground utility easement
(MROSD to grant to City of Palo Alto)
Other protected lands
Private property
Midpen preserves
Exhibit A - Project Area Map
!#

R A N C H O S A N

A N T O N I O O P E N

S P A C E P R E S E R V E

M O N T E B E L L O

O P E N S P A C E

P R E S E R V E
Indi an Cr eek
Adob e
Cr eek
Stev e n
s Cr eek
W
es t F
o r k A
dob e C r e e
k
Mon
tebelloRoa
d
Bella Vis ta Trail
Indian Creek Trail
Pag e Mil
l Tra
il Adob
e CreekTrail Black M
ountainTrail
SkidRoad Trail
Quarry T rail
O ld RanchTrail
CanyonTrail
Adobe C
reek Tr
ail
Adobe Creek Trail
Steven
s Creek Nature Trail
Black
Mountain
2,812'
2200
2000
1800
2600
2400
2200
2000
2000
1800
2000
1800
2800
2800 2400
2000
2000
2000
1800
1600
2000
2000
35125014
3510900235106025
35112069

HIDDEN VILLA
!
!
!!
!
!
!
!
!
!
!
Area of detail

FOOTHILLS

LA HONDA
CREEK

LONG RIDGE

SARATOGA
GAP

THORNEWOOD

WINDY HILL

RANCHO SAN

ANTONIOCOAL CREEK

LOS TRANCOS
MONTE

BELLORUSSIAN RIDGE
ÄÆ35
ÄÆ84
ÄÆ9
ÄÆ280
Los Altos
Existing overhead utility easement
(City of Palo Alto to vacate)
Trail
Unpaved all-season road
Unpaved seasonal road
Paved roadCounty parcel
NOTE: The easements shown are graphical
visualizations only; it is not an assessed interest.

For surveyed location of easements, reference
Cross Lands Surveying Inc. Project NO. 22-146
dated 3/15/2024.

Existing overhead electrical line
&
&
Easement 1
&
&
Easement 2
&
&
Easement 3
Exhibit B - Existing Utility Easements

1260

MONTE BELLO ROAD
3 2-1/0 AL
F8A ELF772
7498
55' 50'
6770
50'
6768
50'
6769
50'
6771
45'
6772
10 6461
F
P
P
P
PP
P
PP
P
P
P
P
S
TX PAD54" x60"
PPPPP
P
600'
700'
12'
60'
F
PB40409
3'X5'

FIBER BOX
30"X48"
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P

135'
P
P
P
P
P
P
P
P
P
P
P

P
P 550'PB40416
3'X5'

FIBER BOX
30"X48"
LB30070
LB VAULT - 3'X5'
LB PAD - 4'X6'
500'500'
16 17
18 19
20 F

FIBER BOX
30"X48"
Public
Utility
Easement
20' Wide

UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto

APPROVED
SR. ENGINEER / MANAGER
ENGR.

CHKD.

DRWN
CKT #MAP # SCALE
DATE APPR.

SHEET
W.O.# / DRAWING #
OF

DESCRIPTION
California 40027598

FOOTHILL FIRE MITIGATION PROJECT
PHASE 4

MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
---- HV-20
5 10
LOCATION 17 - LB30070

INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30070
1 - 4' X 6' LOAD BREAK PAD 30070
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE

FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 18 - PB40406

INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40406

WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE

FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 19 - XFMR PAD

INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 20 - PB40409

INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40409

WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE

FIBER BOX WITH FULL TRAFFIC TOP

CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 16 & 17
~550' - 2-3.63" PRIMARY CONDUIT FROM NEW
PB 40416 TO NEW LB 30070
~550' - 1- 3.63" FIBER CONDUIT FROM NEW

FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 17 & 18
~275' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB30070 TO NEW PB 40406
~275' - 1- 3.63" FIBER CONDUIT FROM NEW

FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 18 & 19
~10' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40406 TO NEW XFMR PAD
BETWEEN LOCATION 19 & 19A
~60' - 1-3.63" SECONDARY CONDUIT FROM

NEW XFMR PAD TO EXISTING JUNCTION
BOX
BETWEEN LOCATION 17 & 20
~700' - 2-3.63" PRIMARY CONDUIT FROM NEW
LB 30070 TO NEW PB 40409
~700' - 1- 3.63" FIBER CONDUIT FROM NEW

FIBER BOX TO NEW FIBER BOX
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL

APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED

FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman
Exhibit C - City Alignment Plans

MONTE BELLO ROAD
2-#6 COPPERWELD
2-#6 COPPERWELD
50'6771
45'6772
50'6773
45'6774
F
F

PPPPPPPPPPPPPP
P

PPPPPPPPPPPPPP
PB404033'X5'
PB404053'X5'
600'
600'
600'
FIBER BOX30"X48"
FIBER BOX30"X48"
FPB404043'X5'FIBER BOX30"X48"PPPPPPPPPPPPPP
F
PB404093'X5'FIBER BOX30"X48"PPPPPPPP
20 21
22 23
UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4MP NEXTLEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-206 10
LOCATION 20 - PB40409INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40409WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 21 - PB40405INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40405WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 22 - PB40404INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40404WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 23 - PB40403INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40403WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 20 & 21~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40409 TO NEW PB 40405~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 21 & 22~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40405 TO NEW PB 40404~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 22 & 23~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40404 TO NEW PB 40403~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

MONTE BELLO ROAD

MONTE BELLO ROAD
2-#6 COPPERWELD
2-#6 COPPERWELD
45'6774
45'6775
45'6776
40'6777
45'6778
45'6779
40'6781
45'6780
45'6784
F

F
PP
F

PPPPPPPP
F

PPPPPPPPP

F

PPPPPPP

PPPPPPPPP

PB403993'X5'
PB404003'X5'
PB404013'X5'
PB404023'X5'
PB404033'X5'
600'
600'
600'
600'
FIBER BOX30"X48"
FIBER BOX30"X48"
FIBER BOX30"X48"
FIBER BOX30"X48"
FIBER BOX30"X48"

PPPPPPPPP
600'
23 24
25 26
27 UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4MP NEXTLEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-207 10
LOCATION 24 - PB40402INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40402WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 25 - PB40401INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40401WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 26 - PB40400INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40400WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 24 & 25~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40402 TO NEW PB 40401~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 25 & 26~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40401 TO NEW PB 40400~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 26 & 27~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40400 TO NEW PB 40399~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

3 #2 TRI 2-#6 COPPERWELD
2-#6 COPPERWELD
45'6794
40'6796
45'6780
45'6784 45'6785

POLESERVICE
40'6787
35'6793
30'678950'6788
45'6791
106467
154503
F
P
F

PPPPPPPPPPPPPPPPPPPP
F
SS

TX PAD54"X60"
PB403953'X5'PB403963'X5'
PB403993'X5'
LB30060LB VAULT - 3'X5'LB PAD - 4'X6'
380'
95'575'600'85'
FIBER BOX30"X48"FIBER BOX30"X48"
25'
FIBER BOX30"X48"
PB403973'X5'

SSSSSSSSSSSSSS
585'
10'
2 - 3.63"

PPPPPPPPPPPPPPP

600'
F
PPPPPPPPPFIBER BOX30"X48"
BOX24"X36"
27 28
293030A
30B
30C
31 32 33
UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4MP NEXTLEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-208 10
LOCATION 27 - PB40399INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40399WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 28 - LB30060INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3'X 5' LOAD BREAK PAD 300601 - 3' X 5' LOAD BREAK PAD 30060LOCATION 29 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 30INSTALL1 - 24" X 36" JUNCTION BOXLOCATION 30B - PB40397INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40397WITH FULL TRAFFIC COVERLOCATION 31INSTALL1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 32 - PB40396INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40396WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 26 & 27~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40400 TO NEW PB 40399~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 27 & 28~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40399 TO NEW LB 30060BETWEEN LOCATION 28 & 29~25' - 1 -3.63" PRIMARY CONDUIT FROM NEWLB 30060 TO NEW XFMR PADBETWEEN LOCATION 29 & 30~10' - 4-3.63" SECONDARY CONDUIT FROMNEW 54" X 60" XFMR PAD TO NEW 24" X 36"JUNCTION BOXBETWEEN LOCATION 30 & 30A~95' - 1-3.63" SECONDARY CONDUIT FROMNEW 24" X 36" JUNCTION BOX TO EXISTINGJUNCTION BOXBETWEEN LOCATION 30 & 30B~585' - 1-3.63" SECONDARY CONDUIT FROMNEW 24" X 36" JUNCTION BOX TO NEW PB40397BETWEEN LOCATION 30B & 30C~6' - 1 - 3.63" SECONDARY CONDUIT FROMPB 40397 TO NEW 3" RISERBETWEEN LOCATION 30 & 32~400'- 1-3.63" PRIMARY CONDUIT FROM NEWLB 30060 TO NEW PB 40396BETWEEN LOCATION 27 & 31~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 31 & 32~400' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 32 & 33~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40396 TO NEW PB 40395~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX****NOTE****THE SCOPE OF WORK BETWEEN LOCATION30, 30B, & 30C MAY BE REMOVED AS OPENSPACE MAY NOT NEED CPAU ELECTRICSERVICE

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

2-#6 COPPERWELD
45'6797
F
F

PB403953'X5'
600'
FIBER BOX30"X48"

PPPPPPPPPPPPPP

PPPPPPPPPPP

600' 33
34 1719172117231725MONTE BELLO ROAD
N48PB10612-#4 ACSRTRI2-#4 ACSRF6AELF773679845'
40'6799PPPPPPPPPPPP
40'6800
F
TX PAD54"X60"LB30059LB VAULT - 3'X5'LB PAD - 4'X6'
125'125'
FIBER BOX30"X48"
5' PPPP

3536
3737ASS
SS
125'
PB403943'X5'FIBER BOX30"X48"
5'

UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECT PHASE 4MP NEXTLEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-209 10
LOCATION 33 - PB40395INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40395WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 34 - PB40394INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40394WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 35 - LB30059INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'X 6' LOAD BREAK PAD 300591 - 4' X 6' LOAD BREAK PAD 300591 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 36 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 37INSTALL1 - 24" X 36" JUNCTION BOXLOCATION 37AINSTALL1 - 3" RISERLOCATION 37BINSTALL1 - 24" X 36" JUNCTION BOXLOCATION 37CINSTALL1 - 3" RISER CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 33 & 34~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40395 TO NEW PB 40394~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 34 & 35~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40394 TO NEW LB 30059 ~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 35 & 36~5' - 1-3.63" PRIMARY CONDUIT FROM NEWLB 30059 TO NEW XFMR PADBETWEEN LOCATION 36 & 37~125' - 1-3.63" SECONDARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 SECONDARYBOX ~125' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW 24X36 SECONDARY BOXBETWEEN LOCATION 37 & 37A~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6799BETWEEN LOCATION 37 & 37B~125' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOXBETWEEN LOCATION 37B & 37C~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6800

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

1741
1757
17231725 17271729
2-#4 ACSRTRI2-#4 ACSR

OPEN WIRE
2-#4 ACSR
2-#4 ACSR
33-#2 STR CU
35'6801
35'6802
35'6803
35'6804
40'6805
40'6806
257747 257599
SET AT TAP "B"37.5780597.5%

PPPPPPPPPPPPPP
40'6800

SSSF F

TX PAD54"X60"
PB403913'X5'
PB403923'X5'
BOX24"X36"600'
175'
600'
FIBER BOX30"X48"
FIBER BOX30"X48"
TX PAD54"X60"

7'
25'5'
15'

PPPPPPPPPPPPPP
FPB404083'X5'FIBER BOX30"X48"PPPPPP

375'
37 38
39 40
4141A41B
42 37BSS125'
42B
5'37C

15'42A
UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4MP NEXT LEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-201010
LOCATION 36 - TX PADINSTALL1 - 54" X 60" XFMR PADLOCATION 37INSTALL1 - 24" X 36" JUNCTION BOXLOCATION 37AINSTALL1 - 3" RISERLOCATION 37BINSTALL1 - 24" X 36" JUNCTION BOXLOCATION 37CINSTALL1 - 3" RISERLOCATION 38 - PB40408INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40408WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 39 - PB40392INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40392WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 40 - PB40391INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40391WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 41 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 41AINSTALL1 - 24" X 36" JUNCTION BOXLOCATION 41B - POLE 6805INSTALL1 - 3" RISERLOCATION 42INSTALL1 - 24" X 36" JUNCTION BOXLOCATION 42A - EXISTINGJUNCTION BOXLOCATION 42B - POLE 6806INSTALL1 - 3" RISER CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 35 & 36~5' - 1-3.63" PRIMARY CONDUIT FROM NEWLB 30059 TO NEW TX PADBETWEEN LOCATION 36 & 37~125' - 1-3.63" SECONDARY CONDUIT FROMNEW TX PAD TO NEW 24X36 SECONDARYBOX ~125' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW 24X36 SECONDARY BOXBETWEEN LOCATION 37 & 37A~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6799BETWEEN LOCATION 37 & 37B~125' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOXBETWEEN LOCATION 37B & 37C~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6800BETWEEN LOCATION 35 & 38~270' - 1-3.63" PRIMARY CONDUIT FROM NEWLB30059 TO NEW PB 40408~270' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 38 & 39~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40408 TO NEW PB 40392~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 39 & 40~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40392 TO NEW PB 40391~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 40 & 41~15' - 1 -3.63" PRIMARY CONDUIT FROM NEWPB 40391 TO NEW XFMR PADBETWEEN LOCATION 41 & 41A~25' - 1 - 3.63" SECONDARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 JUNCTIONBOXBETWEEN LOCATION 41A & 41B~5' - 1 - 3.63" SECONDARY CONDUIT FROMNEW JUNCTION BOX TO NEW 3" RISERBETWEEN LOCATION 41 & 42~105' - 1 -3.63" PRIMARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 JUNCTIONBOX~105' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW 24X36 JUNCTION BOXBETWEEN LOCATION 42 & 42A~15' - 1 - 3.63" SECONDARY CONDUIT FROMNEW 24X36 JUNCTION BOX TO EXISTINGJUNCTION BOXBETWEEN LOCATION 42A & 42A~5' - 1 - 3" RISER FROM NEW 24X36JUNCTION BOX TO EXISTING POLE

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

RECORDING REQUESTED BY
AND WHEN RECORDED RETURNED TO:

City of Palo Alto
250 Hamilton Avenue
Palo Alto, California 94301
Attn: Real Estate Division
Space above this line for recorder’s use only

NO TRANSFER TAX DUE DULY RECORDED WITHOUT FEE
PUBLIC AGENCY ACQUIRING TITLE, Pursuant to Government Code CALIFORNIA REVENUE AND TAXATION Sections 6103, 27383 & 27388 CODE SECTION 11922.

Underground Utility Easement
This Underground Utility Easement (“Agreement”), dated , 2025 (“Effective Date”), is made and entered into, by, and between CITY OF PALO ALTO, a California chartered municipal corporation (“City”), and MIDPENINSULA REGIONAL OPEN SPACE DISTRICT, a Public District formed pursuant to Article 3 of Chapter 3 of Division 5 of the California Public Resources Code (“District”). City and District are sometimes referred to in this Agreement singularly as a “Party” and together as “Parties.”

RECITALS
WHEREAS, the District is the owner of the real property situated in unincorporated Santa Clara County known as Assessor’s Parcel Numbers 351-25-014, 351-06-025, 351-09-002 and 351-12-069 ("District Property"), as part of District’s Monte Bello Open Space Preserve and Rancho San Antonio Open Space Preserve, copies of which Deeds are attached hereto as Exhibit A and incorporated herein by reference; and
WHEREAS, the City holds three right-of-way and utility easements for overhead electric transmission lines across District Property, as assigned by Pacific Gas and Electric Company (“Existing Utility Easements”), copies of which Deeds are attached hereto as Exhibit B and incorporated herein by reference; and
WHEREAS, the City has been directed by the California Public Utilities Commission (“CPUC”) to identify areas within their jurisdiction that are susceptible to power-line ignited wildfires; and
WHEREAS, the City determined that their service territory west of Interstate 280, including the District Property, has an elevated risk of wildfire due to being in the Palo Alto foothills and wind, and therefore seeks to convert their overhead electric lines to underground lines along Montebello Road within District Property; and WHEREAS, the City wishes to convert its existing overhead utility lines and facilities to underground electric and communications lines and facilities along Montebello Road within District Property via three existing easements (Santa Clara County Document Number 228900, Exhibit D - Form of Underground Utility Easement

Page 2 ends

Volume 1053, Page 538; Document Number 227988, Volume 1048, Page 567; and Document Number 227989, Volume 1048, Page 562); and

WHEREAS, the District, in exchange for City quitclaiming all rights to maintain overhead utility facilities on District Property, is willing to grant City this Underground Utility Easement;

NOW, THEREFORE, in consideration of the foregoing recitals and the mutual promises and covenants herein contained, the City and District hereto agree as follows:

1. Grant of Underground Utility Easement.

(a) Easement Scope and Description. District hereby grants to City a perpetual, non-exclusive utility easement for the installation, operation, repair, replacement, upgrading, and maintenance of a subsurface conduit system for electric lines and communications transmission lines and associated subsurface and above ground cables, conduits, ducts, manholes, equipment and appurtenances used for transmitting and distributing electric energy and information (collectively, “Underground Utility System”) under, across and along Montebello Road as it crosses District Property (the “Underground Utility Easement”). A legal description and plat map of the Underground Utility Easement is included in Exhibit C attached hereto and incorporated by this reference. The Underground Utility Easement shall include the right of ingress and egress over Montebello Road and Black Mountain Trail on the District Property for purposes related to the City’s use of the Underground Utility Easement. The Underground Utility Easement is intended solely to serve District Property, and therefore, is not offered for, and shall not be dedicated to, public use.
(b) Term. The term of the Underground Utility Easement shall commence on the Effective Date and shall be perpetual.
(c) Use Restrictions. Use of the Underground Utility Easement by City shall be limited to construction, reconstruction, installation, operation, repair, replacement, upgrading, and maintenance of the Underground Utility System. The City shall use the Underground Utility Easement in accordance with the following:
(i) No at-grade or above-grade structures shall be installed pursuant to the Underground Utility Easement except for poles, pads, equipment cabinets, vaults and bollards that are appurtenant to the Underground Utility System. (ii) All subsurface utilities shall be enclosed in a conduit system, which shall be installed with a minimum cover of twenty-four (24) inches below grade at all locations on the District Property, regardless of mechanical protection . Exceptions to the minimum cover requirement are allowed only where cables and conductors rise for terminations or splices or where access is otherwise required by applicable law.
(iii) No other utilities shall be co -located in the Underground Utility Easement and City shall not have the right to apportion rights under the Underground Utility Easement to any other utility or service provider.

Page 3 ends

(iv) City shall restore District Property promptly following City’s performance of any work pursuant to the Underground Utility Easement to the condition the property was i n immediately prior to City’s work, or to a n equivalent condition subject to the District’s reasonable approval. City may not close , obstruct or otherwise interfere with use of Montebello Road or Black Mountain Trail without the District’s prior written approval. (d) Repair and Maintenance.
(i) City shall be solely responsible, at its sole cost and expense, for constructing, reconstructing, installing, operating, repairing and maintaining the Underground Utility System in accordance with the City of Palo Alto Utilities’ Rules and Regulations , which may include the addition of erosion control measures surrounding utility equipment. In addition, City shall be solely responsible for maintaining the Underground Utility System in a safe condition and free of hazardous conditions. Any maintenance activities shall be conducted by City so as to minimize impacts to District Property.
(ii) District shall not plant any trees or bushes, or erect, construct or install any fence, wall, irrigation or any other type of permanent structure , or private utilities, within, over, across or upon the Underground Utility Easement without first obtaining the City’s written consent, which shall not be unreasonably withheld. District shall maintain Montebello Road and Black Mountain Trail as unpaved, all-season roads. (e) Non-Exclusive Use. The Underground Utility Easement shall be non - exclusive, and District may make use of the Underground Utility Easement area provided that such use does not unreasonably interfere with City’s use of the Underground Utility Easement or its intended purposes as permitted under this Agreement.

2. Representation and Warranties. District represents and warrants to City that District has good and marketable title to the District Property, and there are no matters affecting title to the District Property that adversely affect the Underground Utility Easement or the rights granted under this Agreement.

3. Requirements of Law . City shall comply with all present and future laws, rules, orders, ordinances, regulations, statutes, requirements, codes, and executive orders (collectively, “Laws”) of all governmental authorities now existing or hereafter created affecting the Underground Utility Easement granted herein or uses thereof.

4. Mechanic’s Liens . City shall hold harmless, indemnify and defend District from and against any mechanic’s or other liens arising from City’s work, including any liabilities, costs, losses, damages, expenses, causes of action, claims or judgments (including court costs and reasonable attorneys’ fees) on account of such mechanic’s or other liens.

5. As-Is Conveyance. City agrees and acknowledges that District makes no representations or warranties as to the condition of the area contained within the Underground Utility Easement or its suitability for City’s purposes. Neither District nor anyone acting for or on behalf of District has made any representation, statement, warranty or promise to City concerning the physical aspects or condition of the Underground Utility Easement including, without limitation, conditions of the soil, land use restrictions, existence or non-existence of “Hazardous Materials” or suitability

Page 4 ends

for the purpose for which City plans on using the Underground Utility Easement. City specifically acknowledges that it is entering into this Agreement with respect to the “As-Is” physical condition and “As-Is” state of repair of the Underground Utility Easement. For purposes of this Agreement, “Hazardous Materials” includes, without limitation, any flammable materials, explosive, hazardous or toxic substances, or related materials defined in the Comprehensive Environmental Response, Compensation and Liabi lity Act of 1980, as now or hereafter amended (42 U.S.C.

Section 9601, et seq.), the Hazardous Materials Transportation Act, as now or hereafter amended (49 U.S.C. Sections 1801, et seq. ), the Resource Conservation and Recovery Act (42 U.S.C.

Sections 9601, et seq.), and in the regulations promulgated pursuant thereto, or any other similar federal, state or local government law, ordinance, rule or regulation. However, District shall be solely and completely responsible for responding to and complying with any administrative notice, order, request or demand, or third party claim or demand, relating to potential or actual Hazardous Materials contamination on, in, or under the Underground Utility Easement, including all costs of remediation and clean up, except to the extent such contamination was caused by City or City’s invitees.

6. Insurance. City, at City’s sole expense, shall maintain and keep in force during the term of the Underground Utility Easement a policy of general liability insurance against claims for bodily injury, personal injury, death and/or property damage arising from City’s use of the Underground Utility Easement, or from any occurrence in, on, about, or related to the Underground Utility Easement, with limits which shall not be less than Two Million Dollars ($2,000,000.00) per occurrence. District shall be named as an additional insured on such policy.

Upon District’s request, City shall promptly furnish to District an endorsement evidencing such insurance coverage. City shall require any contractors performing work on District Property to maintain insurance satisfying the above requirements. The District acknowledges that City’s insurance requirements may be satisfied in whole or in part by adequately funded self-insurance programs or self-insured retentions that have been pre-approved by the District. City agrees to furnish a certificate of its contractor(s)’s insurance to District, and evidence of any self-insurance program for City coverage, naming District as an additional insured upon District’s request. All such liability insurance shall insure performance by City of the indemnity provisions hereof, and the policy shall contain a cross-liability endorsement. No such policy of insurance shall be cancelable or subject to reduction of coverage or other modification except after thirty (30) days prior written notice. The limits of said insurance shall in no event be deemed to limit the liability of City hereunder.

7. Indemnity. Each Party (the “Indemnitor”) shall indemnify, defend, and hold harmless the other Party (“Indemnitee”) and its officers, employees, agents, administrators, successors, and assigns, from and against any and all claims made or threatened by any third party and all related losses, expenses, damages, costs and liabilities, including reasonable attorneys' fees and expenses incurred in investigation or defense, to the extent the foregoing arise out of or relate to any error, negligent act, omission or willful misconduct by the Indemnitor, its employees, agents, contractors, subcontractors or invitees.

The Indemnitee shall promptly notify the Indemnitor once it is aware of a potential action and shall cooperate with the Indemnitor in all reasonable respects in connection with the defense of any such action at the expense of the Indemnitor. The Indemnitor may, upon written notice to the Indemnitee, undertake to conduct all proceedings or negotiations in connection with the action,

Page 5 ends

assume the defense thereof, including settlement negotiations in connection with the action, and will be responsible for the costs of such defense, negotiations and proceedings. The Indemnitor will have sole control of the defense and settlement of any claims for which it provides indemnification hereunder, provided that the Indemnitor will not enter into any settlement of such claim without the prior approval of the Indemnitee, which approval will not be unreasonably withheld, delayed, or conditioned. The Indemnitee shall have the right to retain separate counsel and participate in the defense of the action or claim at its own expense.

8. No Liability. City waives all claims against District for damage to property, including the Underground Utility System and any Alterations thereto, and any equipment or machinery, and/or injury or death to persons occurring in, on, or about the Underground Utility Easement, from any cause arising at any time, except as may be caused by the District’s negligence or willful misconduct.

9. Notice. All notices, demands, consents, requests, approvals, disapprovals, designations or other communications (all of the foregoing hereinafter referred to as “notice”) that any Party hereto gives to any other Party shall be in writing and shall be deemed to have been properly given if (a) served personally, or (b) mailed, when deposited with the United States Postal Service within the boundaries of the continental United States for registered or certified delivery, return receipt requested, with posta ge prepaid, or (c) sent by overnight courier, postage prepaid, in each case addressed to the applicable recipient as follows:

If to City: City of Palo Alto
Attn: Utilities Department, Electric Engineering
250 Hamilton Avenue
Palo Alto, CA 94301
Telephone: (650) 329-2161

With a copy to:

City of Palo Alto
Attn: Real Property Manager
250 Hamilton Avenue
Palo Alto, CA 94301

If to District: Midpeninsula Regional Open Space District Attn: Real Property Manager
5050 El Camino Real
Los Altos, CA 94022-1404
Telephone: (650) 691-1200

12. Subordination. The Underground Utility Easement shall be superior to any and all deeds of trusts, mortgages, liens, ground leases, licenses, covenants or encumbrances recorded after the recordation of this Agreement that affect the District’s Property, and this Agreement shall survive the foreclosure or termination of any such instrument or interest.

Page 6 ends

13. Authority. The District and City, respectfully, represent and warrant that each has the power and authority to execute and carry out the terms and provisions of this agreement.

12. No Partnership. Nothing contained in this Agreement shall be construed as making District and City joint venturers or partners.

13. Miscellaneous

(a) Mediation of Disputes.

(i) Consultation and Resolution Process. In the event either party believes the other party to this Agreement has failed to comply with its terms, or wishes to propose an amendment to this Agreement to address any term or condition herein, or to discuss any operational issues concerning the Underground Utility Easement, the parties agree to meet and confer within thirty (30) days of receipt of a written request for consultation delivered to the other party as set out in Section 9 herein.

(ii) If the consultation process set out in Subsection (a) (i) fails to resolve any dispute arising out of or relating to this Agreement or the performance or breach thereof, the parties agree to participate in good faith in non-binding mediation in order to resolve their dispute prior to pursuing any available legal remedies.

(b) Captions. The captions of this Agreement are inserted only as a matter of convenience and for reference. They do not define, limit or describe the scope or intent of this Agreement and they shall not affect the interpretation hereof.

(c) Exhibits. Each of the Exhibits referenced in this Agreement is attached hereto and incorporated herein.

(d) Amendment. This Agreement may be amended only by an instrument in writing executed by the Parties hereto or by their successors and assigns.

(e) Time. Time is of the essence of this Agreement.

(f) Written Consent Required. Whenever a Party is requested to consent or to approve of any matter with respect to which its consent or approval is required by this Agreement, such consent or approval shall be given in writing.

(g) Further Assurances. The Parties shall execute such further documents and instruments as may reasonably be required from time to time by the other Party to effectuate and carry out the provisions hereof and to take such further actions as may reasonably be required to give the terms hereof full force and effect for the benefit of the Parties.

(h) Terms Run with the Land. The easements, terms, covenants and conditions contained herein shall run with the land and be binding upon and inure to the benefit of the successors and assigns of the Parties hereto pursuant to California Civil Code Section 1468.

Page 7 ends

(i) Severability. If any provision of this Agreement shall to any extent be invalid or unenforceable, the remainder of this Agreement (or the application of such provision to persons or circumstances other than those in respect of which it is invalid or unenforceable) sh all not be affected thereby, and each provision of this Agreement, unless specifically conditioned upon such invalid or unenforceable provision, shall be valid and enforceable to the fullest extent permitted by law.

(j) Governing Law . This Agreement shall be construed and governed in accordance with the laws of the State of California.

(k) Counterparts. This Agreement may be executed in counterparts, each of which shall constitute an original, and all of which together shall constitute one and the same instrument.

IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the date first written above.

CITY:

CITY OF PALO ALTO, a California
chartered municipal corporation

By: _____________________________
City Manager or designee

Date: __________________________

APPROVED AS TO FORM:

By:

City Attorney or designee

DISTRICT:

MIDPENINSULA REGIONAL OPEN SPACE
DISTRICT, a Public District formed pursuant to
Section 3 of Chapter 3 of Division 5 of the
California Public Resources Code

By:

Ana M. Ruiz, General Manager

Date: ______________________________

APPROVED AS TO FORM:

By:

Hilary Stevenson, General Counsel

ATTEST:

By: _____________________________
Maria Soria, District Clerk
Exhibit A - District Property

r
K 27PAGE 501
L
Order No. 1003 - 87 9 r..

Escrow No. 1 ° 95794Sg
Loan No.

RECFEE ` Recordedat tt;a Raquestof
FirstAmericvTitleGi1arar:tyCo.

WHEN RECORDED MAIL TO: RMF
MICRO 8:00
iYli. dpeninsula Regional Open Space District JAN 2 51988 A.M.

Old Mill Office Ctr. , Bldg. C, Suite 1 5 LIENNOT
201 San Antonio Circle LAURIE KAN-, Recorder
Mountain view, Ca. 94040 Sh1PF SantaClaraCounty,OfficialRecords Attn: Sandy Voorhees PCOR

SPACE ABOVE THIS LINE FOR RECORDER' S USE

FULL RECONVEYANCE
FIRST AMERICAN TITLE INSURANCE COMPANY, a Corporation, Trustee under the Deed of Trust executed by MIDPENINSULA REGIONAL OPEN SPACE DISTRICT ( a Public Districts Trustor, and recorded__ ember 2, 1977 as Document No. 5860350 in Book D31 6 page_ ___ R8 of Official Records in the Office of the County Recorder of Santa Clara County, California, having been requested in writing by the holder of the obligation secured by said Deed of Trust, to reconvey the estate granted to Trustee under said Deed of Trust, does hereby reconvey to the person or persons legally entitled thereto, without warranty, all the estate, title and interest acquired by Trustee under said Deed of Trust.

DESCRIPTION " As described in said Deed of Trust."
IN WITNESS WHEREOF, said FIRST AMERICAN TITLE INSURANCE COMPANY, Trustee, hascaused itscorporate name and seal to be hereto affixed by its Assistant Secretary, thereunto duly authorized.

Dated: December 31, 1987 ...
sss/// (
iE INSu FIRST AMERICAN TITLE INSURANCE COMPANY
a" I11Por(l0 itCi1
Sept. 24, K02 By J 0. Turner
c%
Assistant Secretary
STATE OF CALIFORNIA C L!FOR'•b'
COUNTY OF San Mateo
On--_ December 31, 1987 before me,
the undersigned, a Notary Public in and for said State, personally appeared Jay 0. Turner
personally known to me to be the person who executed the within instru- ment as Assistant Secretary, on behalf of First American Title Insurance7NOIARY
111
Company, the corporation therein named, and acknowledged to me that Y DUNCAN PU6UC- CALIFORNIA
such corporation executed the within instrument as Trustee.

CiPAL OFFICE IN
WITNESS my and
officiaZ,4

SAN MATEO COUNTY
my Commiewon E Was"./. 19N
Signature,--/
This area for official seal)
N 426125
1323( 7/ 82)
Order- No.

Escrow No. 1- 4084
Loan No.
i
WHEN RECORDED MAIL TO:

Alyce Lee Burns

SPACE ABOVE THIS LINE FOR RECORDER' S USE

DEED OF TRUST WITH ASSIGNMENT OF RENTS

SHORT FORM)
This DEED OF TRUST, made November 21 , 1977 between
MIDPENINSULAREGIONALOPENSPACEDISTRICT (a Public District) hereincalledTRUSTOR, whose address is 375 Di stet Circle, Suite D- 1 Los Altos, California 94022 Number and Street) City) State)
FIRST AMERICAN TITLE INSURANCE COMPANY, a California corporation, herein called TRUSTEE, and

ALYCE LEE BURNS, A MARRIED WOMAN
herein called BENEFICIARY,
WITNESSETH: ThatTrustorgrantsto Trusteein Trust, with Powerof Sale, thatpropertyin the County of Santa Clara State of California, described as:

SEE EXHIBIT " A" ATTACHEDHERETOANDMADEA PARTHEREOFFORLEGALDESCRIPTION I
I
i
Togetherwiththerents,issuesandprofitsthereof,subject, however,totheright, powerandauthorityhereinaftergivento andconferreduponBeneficiaryto collect and apply such rents, issues and profits.
1 , 600, 000. 00For the Purpose of Securing( 1) payment of the sum of$ with interestthereonaccordingto the termsof a promissorynote or notesof evendate herewithmadeby Truster, payableto orderof Beneficiary, and extensionsor renewalsthereof, and (2) the performanceof each agreementof Trustorincorporatedby referenceor containedherein (3) Paymentof additionalsumsand interestthereonwhich mayhereafterbe loanedto Truster, or hissuccessorsor assigns,whenevidencedby a promissorynoteor notesrecitingthattheyaresecuredby thisDeedof Trust.

To protectthesecurityof this Deedof Trust, andwith respectto the propertyabovedescribed, Trustorexpresslymakeseachand all of the agreements, andadoptsandagreestoperformandbeboundbyeachandallof thetermsandprovisionssetforthin subdivisionA, andit is mutuallyagreedthateachandallof thetermsandprovisionssetforthinsubdivisionBof thefictitiousdeedof trustrecordedin OrangeCountyAugust17, 1964, andin all other countiesAugust18, 1964, in thebookandat thepageof OfficialRecordsin theofficeof thecountyrecorderof thecountywheresaidpropertyis heated,notedbelow oppositethe nameof suchcounty,namely:

COUNTY BOOK PAGE COUNTY BOOK PAGE COUNTY BOOK PAGE COUNTY BOOK PAGEAlameda 1288 556 Kings 858 713 Placer 1028 379 Sierra 38 187Alpine 3 13031 Lake 437 110 Plumas 166 1307 Siskiyou 506 762Amador 133 438 Lassen 192 367 Riverside 3778 347 Solano 1287 621Butte 1330 513 Los Angeles T• 3878 874 Sacramento 5039 124 Sonoma 2067 427Calaveras 185 338 Madera 911 136 San Benito 300 405 Stanistaus 1970 56Colusa 323 391 Marin 1849 122 San Bernardino 6213 76$ Sutter 655 585Contra Costa 4684 1 Mariposa 90 453 San Francisco A• 804 596 Tehama 457 183Del Norte 101 549 Mendocino 667 99 San Joaquin 2855 283 Trinity Toe 595El Dorado 704 635 Merced 1660 753 San Luis Obispo 1311 137 Tulare 2530 108Fresno 5052 623 Modoc 191 93 San Mateo 4778 175 Tuolumne 177 160Glenn 469 76 Mono 69 302 Santa Barbara 2065 881 Ventura 2607 237Humboldt 801 83 Monterey 357 239 Santa Clara 6626 664 Yolo 769 16Imperial 1189 701 Napa 704 742 Santa Cruz 1638 607 Yuba 398 693inyo 165 672 Nevada 363 94 Shasta Boo 633 Kern 3756 690 Orange 7182 18 San Diego SERIES 5 Book 1964, Page 149774 shaltinuretoandbindthepartieshereto, withrespecttothepropertyabovedescribed. Saidagreements, termsandprovisionscontainedinsaidsubdivisionAandB,(identicalinallcounties,andprintedonthereversesidehereof)arebythewithinreferencethereto, incorporatedhereinandmadeapartofthisDeedofTrustforallpurposesasfullyasifsetforthatlengthherein, andBeneficiarymaychargeforastatementregardingtheobligationsecuredhereby, providedthe chargetherefor doesnot exceedthe maximumallowed by law.

TheundersignedTrustor, requeststhatacopyofanynoticeofdefaultandanynoticeofsalehereunderbemailedtohimathisaddresshereinbeforesetforth.

STATE OF CALIFORNIA,
Signature of Trustor
COUNTY
ss.

On—__.._ -__— before me, the MIDPENINSULA REGIONAL OPEN SPACE DISTRICT undersigned, a Notary Public in and for said State, personally appeared i
President, Wcardof Direct `
known to me
to be the person_.— whose name_.__ subscribed to the within T
instrument and acknowledged that executed the some.

WITNFSS my hund and official seal.

Signature
i
1 Name ( Typed or Printed)
This area for official notarial seal) 115$( 11I681 ' EXHIBIT " A"

PARCEL ONE A
The Northwest 1/ 4 of Section 14 ; the North 1/ 2 of the Southeast 1/ 4 of Section 15 ; all that portion of the Fractional Northwest 1/ 4 of Section 15 , lying Easterly and Southerly of the center line of the Page Mill Road , and al that portion of the South 1/ 2 of the Northeast 1/ 4 of Section 15 , lyingEasterlyand Southerly of the cf, nter line of Page Mill Road ; all in Township7 , South Range 3 West, Mount Diablo Base and Meridian.

EXCEPTINGTHEREFROMall that portion thereof included within the Noun(-}s of the County of San Mateo, State of California.

ALSO EXCEPTING THEREFROMall that portion of the South 1/ 2 of the Northeast 1/ 4 of Section 15 lying Easterly and Southerly of the centerline of Page Mill Road and lying East of a line drawn due South from the intersec of the centerline of PageMill Roadwith the division line betweenthe Countyof Santa Clara and the County of San Mateo; said division line beingdesignated as " South 810 15 ' East" between " Station 64 and Station 6510 , all being shown on that certain Record of Survey recorded July 18 , 19512 in Book32 of Maps , page 33 .

PARCEL 01,1E B
Beginning at the Quarter Section corner on the center of Section 151Township 7 South, Range 3 West , M. D. M. , and running thence: along, the Quarter Section line running East and West throug;ht the center of said Section 15North 890 30' West 23. 58 chains to a stake marked D. M. 13 standi. r.g at the intersection of said Quarter Section line with a picket fence from which stake the Quarter Section corner between Sections 15 and 16 , bears Nort:.89 1/ 2' West 17. 27 chains said . stake D. H. 13 being the Northwesterly cornerof that 79 acre tract , more or less deeded to Lambert Dornberger by Deeddated September 7 , 1886 and recorded in Book 88 of Deeds , page 67 in theoffice of the County Recorder of Santa Clara County, California runningthence along the said picket fence, and the Westerly line of said 79 acre tra-South 42 1/ 40 East 9. 67 chains to a 6" x 6" fence post marked D- i-i 12 , andSouth 17 1/ 20 East 4. 80 chains to an elderberry tree marked D-M 11 standingat the end of said picket fence; thence running along the East side of a4 ravine South 22 3/ 40 East 2. 43 chains, South 14 3/ 4' West 1. 65 chains to aleaning laurel 30 inches in diameter marked D- 1-1 9 , South 6 1/ 20 East 1. 22 chains , South 44 3/ 41 East 2. 85 chains to Station D. M. 7 , South 71 3/ 40 East1. 15 chains to a live oak tree marked D- M 6 , South 18 1/ 41 East 1. 27 chains,to a white oak marked D- M 5 , South 161 East 2. 80 chains , South 18 1/ 1 0 East11. 30 chairs , South 30 1/ 1; 0 East 3. 80 chains ,
South 391 East 1. 20 chains ,South 1 p -,1 1 2 l. w t 1. 29 chains to the cent er of StevensCreek• thence upont} le center of said Creek, South 121 West 2. 31 chains South 5 1/ 110v ca.. s t1. 20 chains to Station; South 17 1/ 41 Hest at 0. 70 chains to a point fromwhich the Quarter Section corner between Section 15 and 22 , Township 7 Soj; LL-Rang; ct 3 t, est , bears North 83 3/ 40 East 5. 80 chains at 1. 72 chains - to Statior ,South 10" East 2 . 00 chain:: South 36 3/ 40 West 1. 95 chain: to station near.the confluence of two ravines forming Stevens Creek; thence up the center Cont' d on next page)
I
i
1 A
2 s f the Southerly ravine , South 12 3/ 40 East 1. 40 chains South 25 1/ 4cl t2. 30 chains South 28 1/ 40 Easto 1. 15 chains South 22 3 4 East 1. 20 chains ,South 9 1/ 40 East 1. 80 chains , South 34 1/ 40 East 1. 90 chains, South 20 1/ 40East 1. 80 chains , South 14 3/ 41 West 1. 73 chains South 63 3/ 40 West 2. 40chains , South 50 3/ 40 West 2. 87 chains , South 41 3/ 40 West 1. 23 chains to theconfluence of two ravines , South 46 3/ 41 East 0. 90 chains to station in roadto Dornberger from which Station a pine oak tree S" in diameter bears North82 1120 , East 0. 50 chains, thence continuing along the Westerly line of theaforementioned 79 acre tract South 2* East 4. 96 chains, South 80 East 2. 53chains to a tan oak 8" in diameter mar' ced D. M.D M. 4 Sou th 22 We ststto a i 4 . 00 chainspinep tree 6 feet in diame ter marked D. M. 3 - thence lea vingn the tle ster 1line of the aforementioned 79 acre tract and running North 780 17 ' East

11. 72chainsto a stakemarkedD. 3 standingat the mostSoutherlycornerthe fen of cc ar oundund an old orchard thence along1 ng the fence on the Southerly sideof said orchard and the prolongation of said fence, North 61t0 55 ' East 7. 82 chains to a stake marked D.4 standing in a fence running Northwestw est an dSoutheast , thence North 540 05' East 11. 88 3/4 chains to a fence Post mar ke dD. 5 standing at the corner of two fences, thence North 300 11' East 9 . 20chains , cross ravine at 10. 47 chains , a leaning madrone loll in diameter at

12. 57chainsa redwoodtree 8 feet in diameterat 15. 42chainsa madronetree4 feet in diameterat 18. 38chainsa tan oaktree 4 feet in diameterandat23. 24chainsto station in the centerof the StevensCreekfromwhichStationa 2" x 3" stake marked W. P. bears South 300 11' West 20 links and from whichstake a tan oak 12" in diameterbears South18 1/20 West0.15 chains and aleaning tan oak 9" in diameter bears South 83 1/ 41 West 0. 28 chains, runningthence along the center of the Stevens Creek, Southeasterly the followingcourses and distances: ' South 550 30 ' East 1. 75 chains North 600 56 ' East1. 95 chains , South 300 56 ' Fast 2 . 00 chains , South 480 36 ' East 1. 39 chainsNorth 840 09 ' East 1. 81 chains , South 90 38 ' East 1. 07 chains , South 880 oil 'East 1. 49 chains, South 660 45 ' East 1. 23 chains South 210 54 ' East 2. 73chains , South 58' 24 ' East 2. 23 chains , South 590 40 ' . East 3. 07 chains , South50' 59 ' Fast 1. 31 chains , South 4l' 49' East 3. 35 chains , South 830 19'East 2 . 8S chains , South 410 40' East 1. 87 chains, South 58' 24 ' East 1. 70chains , South 42° 43' East 1. 25 chains , South 740 15 ' East 2. 41 chains - to theEast line of the West one- half of the Northwest Quarter of Sec. 23. T. 75. 1' .3tW- , M. D. M. thence along said East line North 00 35' West 14 . 56 chains to t` iQNortheast corner of the West one- half of the Northwest Quarter of Sec. 23 ,T. 7S , R. 3W. , M. D. M, ; thence along the section line running between Sections14 and 23 , T. 7S. , R. 31-1. , M. D. M. , East 39. 65 chains to the Southwest cornerOf that 80 acre tract deeded to Arthur J. Bond by Deed dated April li , 189S andrecorded in Book 177 of Deeds , page 390 in the office of the County Y:ecor:lzrof Santa Clara County, California; thence along the Westerly line of said80 acre tract , 2lorth 30 35' East 40. 51 chains to the Northwest corner ofsaid 80 acre tract in the Quarter Section line running; East and tWest throughthe-.center of Section 14. T. 7S. , R. 3tW. , M. D. M. , thence along the Quart rSection line running East and West through the center of said Section t jl
t 1West to the Quarter Section corner on the West line of said Section It, , then- c.alon; the ; best line of said Section 14 , Southerly 20. 15 chains to a tF" x 4" stake standing at the Northeast corner of the South one-half of the Sout] _ as II Quarter of Section 15 T. 7S, , R. 3W. , t-S. D- 2'i. , thcncn- along the North lin ziof the South one-- half of the Southeast quarter of Section 15 , Piortti 880 30 , I Cont ' d on next pa, r,)
West 40. 80 chains to the Northwest corner of the South one-- half of the Southeast Quarter of said Section 15; thence along the Quarter Section line running North and South through the center of said Section 15 , North 20 East 18 . 1S chains to the place of beginning, being Parts of Sectio ns 14 15 22 and 23 , T. 7S. , R. 3W. , M. D. M.

EXCEPTINGTHEREFROMthat portion thereof conveyed by Sada Coe Robinson to John If. Richey by Deed dated March 13 , 1950 and recorded April 26 , 1950 in Book 1967 of Official Records , page 406 and more particularlydescribed as follows:

Beginning at the point of intersection of the Southerly line of the Skyline Boulevard, as the same existed in January 1950 , with the Westerlyline of he 5t + 4. 89 acre parcel of land conveyed by Bertha A. Hayes to Sada Coe Robinson by Deed dated January 14 , 1946, and recorded January 17 , 19463,in Book 1266 of Official Records, page 531, Santa Clara County Records , thence from said point of beginning Southerly along said Westerly line of the 454. 89 acre parcel above referred to, to the most Southerly corner thereof at a pine tree 6 feet in diameter marked D. M. 3 , thence Northeasterly
along the Southerly line of the said 454. 89 acre parcel to the intersection thereof with the said Southerly line of the Skyline Boulevard; thence Westerly along said line to the point of beginning, being a portion of the North 1/ 2 of Section 22 , Township 7 South, Range 3 West, M. D. B. 6M.

ALSO - the right of way from the lands and premises above described to the County Road , reserved in the Deed from Lambert Dornberger to Frances Mayer, dated June 25 , 1875 and recorded July 29 , 1875 in Book 36 of Deeds , page 506 , Santa Clara County Records.

ALSO the right to take ,
appropriate and use the water of a certain springysituated on the Northwest Quarter of Section 22 , Township 7 , South, Range 3 West M. D. M. , and Northerly from the above mentioned Madrone Tree marked D. M. 2 ,
said spring being the same heretofore used by Lambert Dornberger; also the right to lay down, keep and maintain suitable and proper pipes to conduct said water and to make , erect, keep and maintain there at all necessary and suitable improvement for collecting, storing and using said water and also the right of way for egress and ingress to and from said spring 'over , upon and across the land of Frances Mayer. Also the right of way over the travelled road leading from the Page Mill Road to the premises of Lambert Dornberger; all as reserved in the deed from Lambert Dornberger to Frances Mayer, dated September 7 , 1886 and recorded December 18 , 1886 in Book 87 of Deeds , page 202, Santa Clara County Records.

PARCEL ONE C
All that portion of the South 1/ 2 of the Northeast 1/ 4 of Section 15 , Township 7 South , Range 3 West , lying Easterly and Southerly of thr_ centerline. of Page Mill Road and lying East of a line drawn due South from the intersecti of the center line of PageMill Roadwith the division line betweenthe County Cont ' d on next page)
Of Santa Clara and the County of San Mateo saiddesignated as " South 810 15 ' Ea3t" between" Station v641
and
on
1Stationinen65" allbein€;' shown on that certain Record of Survey recorded July 18 , 1951in Boot: 32 of Maps , page 33.

EXCEPTINGTHEREFROMthe followingdescribedparcelof land:

A portion of the ri or thwest 1/ 21/ 11 of Section 15 , Township 7 South , oRange3oWest, SM.DJB. 6M. , t 1A of h
and
abeingst
more particularly described as follows :

Beginning at an iron pipe in the center line of Page Hill Road, ( 40. 00feet wide) ontheNorthline of theSouth1/2 of theNortheast1/4 of saidSection 15: thence along said North ling , South 89° 10' 07" Eastsfeet tt to an iron 1041. 62pi pepeon the Easterly line of aY private road d ( 20.n width) 00doh) known as Montebello feetntebello Road; then
ce along said Easterly line withfollowing courses and distances: hLance s.

Southerly aloe theY h arthe right the tangent R c of , curve tog nt of which bears South 24° 32 ' 08" East having aradius of 170 feet throu ghti a ocentres tg 1 an gleeof 74. 05 feet to an iron pipe; thence South ao 251 57' 27 an are distance0 25 19 Westest 193 . 74an iron pipe at the beginning of a curve; thence along the arc ofeatcurveto the left , having a - radius of 440 feet; through a central angle of 11°49 ' 15" an arc distanceof 90. 78feet to an iron pipe at a point ofcurvature; thence along the arc of a compound curve to the left, havingpaunaradius of 50 feet , through a central angle of 97° 34' 30" an arc distanceOf 85. 15 feet to an iron pipe; thence North 710 01' 34" East 50. 28 feet toan iron pipe at the beginning of a curve, thence along the arc of a curveto the right, having a radius of 80. 00 feet , through a central angle of880 36 ' 55" an arc distance of 123. 73 feet to an iron pipe; thence South 20021' 34" East 41. 75 feet to an iron pipe at the beginning of a curve; thencealong the arc of a curve to the left having a radius - of 205 . 00 feet; througha central angle of 250 37 ' loll anarcdistanceof 91. 66feet to aniron pip:;,thence South 450 58 ' 41" East 45. 38 feet to an iron pipe at the beginningof a curve; thence along the arc of a curve to the right , having a radiuf185. 00 feet , through a central angle of 22' 49 ' 15" an arc distance of s o

73. 69 feet to an iron Pipe; thence South 231 09' 26" East 141. 68 feet to aniron pipe ; thence leaving said Easterly line of Montebello Road North 89°10 ' 07" West 1698. 75 feet to an iron pipe in the center line ofRoad; - thence along said centerline with the following courses andali,tances:North 400 21 ' 34" East 116. 35 feet to a 3/ 4 inch iron pipe; North 200 54 ' 34"East 179. 86 feet to a 3/ 4 inch iron pipe; North 13° 34 ' Otf" Ea;feet to a 3/ 4 inch iron pipe t 230. 02
Point of beginning.

P P" and North 6 54 ' 43" East 273. 98 feet - to the ALSO EXCEPTING FROM above mentioned Parcels No. 1 and 11o. 3 the f0110'4ingdescribedpropertyasconveyedin the Final Juc1merecorded November 13 , 1964 , in Book 6740 of Official Records , toC ' rnnatiar:
described as follows : pge 287
Cont' d on next page)
4 r
5 Beginning at an iron pipe in the center line of Page Mill Road marking-; es 270 acre tract of land conveyedcorner of that certa in 22most Westerly c rn Ythe t Y r et al dated March 18 1963 andJ. e J .Harry Be rb Alice Lem. Burns to HY Y Y recorded June 20 , 1963 in Book 6071 of official Records , page 412 , Records O i Tt ,
a r
County, California; thence North 88 5D 27 East along theof __:- it Clara u t Y> Southerly line of said Tract of land 1327. 57 feet to the true point of gbeS innin • thence from said true point of beginning North 88' 50' 27" East o r o
361. 43 feet; thence South 12 36 47 East 8 feet ; thence South 47 t ^ n o r ' S140 . 00 fEu 72 53 3 6 West feet ; thencee e SouthT 7 00 feet; thence53 3a test 1 1.

North 270 06' 24" West 263. 00 feet to the true point of beginning, and being a portion of Section 15 , Township 7 South, Range. 3 West , M. D. B. EM.

ALSO EXCEPTIUG FROM all the lands hereinabove described so much thereof as lies within the following described parcel of land:

Beginning at the center of Section 15 , Township 7 South, Range 3 West , M. D. B. EM. , thence Westerly along the Quarter Section line through the center of said Section 15 , North 890 30' West 1556 . 28 feet more or less to a stake marked " D. M. 13" , standing at the intersection of said Quarter Section line with a picket fence from which stake the Quarter Section corner between Sections 15 and 16 , bears North 891 30' West 1556. 28 feet pore or less , said stake " D. M. 13" being the Northwesterly corner of that tract of land deeded to Lambert Dornbarger by Deed dated September 7 , 1886 and recorded in Book 88 of Deeds , page 67 in the office of the County Recordei of Santa Clara County, California, said point being the TRUE P0114T OF BEGINNING , thence from said TRUE POINT OF BEGINNING Westerly along said Quarter Section line running through the center of said Section 15 North 890 30 ' West to the division line between San Mateo County and Santa Clara County ; thence Northerly and Easterly along said county division line , 1636 feet more or less, to the center line of Page' Mill Road ; thence Easterly along the centerline of Page Mill Road, 1230 feet more. or less , to said County division line; thence Easterly along said County Division line to a point lying 350 feet East of a line running North and South through the center of said Section 15 ; thence Southerly along a line, parallel with a North and South section line through the center of Section 15 , said line being 350 feet East of the center of Section 15 , to the Northerly Right of Way line of Skyline Boulevard; thence along the Northerly Right ofn k 1. g y Way line of Skyline Boulevard Westerly to the Westerly line of the 45ii . 8C_+ acre parcel of land conveyed by Bertha A. Hayes to Sada Coe Robinson by Deed dated January 14 , 1946 , and recorded January 17 , 1946 in Book 1266 of Official Records , page 531 , Santa Clara County Records ; thence Northerly t
lozig : id Westerly line of the 454. 89 acre parcel of land to the TRUE: POINIT

OF BEGINNING
I
10 15 14
160 00 AC.)
170. 00 Ac
r
4/
1 3.60AC`
Fa' CFv ryo. v
CIfiY SF V'. LO AL' J•
3 1
13 13693 A
MONTEaE
J
r P. 9RCfL ' C 1
e J AC) c T
C240.. oo AC) l
471. 55 AC TOTAL
8 f6+ AC. TOTAL
s
F
ti
2Yy -Y-lsf- u) s
Y 7> f
l
17 cikL 20. 73 AC.

Is
I
t co
vE. i
r

FORM OF ACKNOWLEDGEMENT
State of California
ss:

County of Santa Clara )
On this the 22 day of November lg 77-
before me, Stanley R. Norton personally appeared
the undersigned officers Daniel Wendin, President
Harry A. Turner , and Nonette Hanko Katherine M. Duffy Edward Shelley Richard Bishop Barbara Green
r
Directors of the Midpeninsula Regional Open
4 Space District, known to me to be the persons described in the foregoing instrument, and acknowledged that they executed the same in the capacity therein stated and for the purposes therein contained.

In witness whereof I hereunto set my hand and official seal. k,
Notar Public
f NOTA2YF
r' r SAt TA CL
Y1978y}
rY
Shra Ave., PaloAlto, CA94306
Ill

FORM OF ACKNOWLEDGEMENT
State of California
ss:

County of Santa Clara
On this the 22 day of November 19 77 ,
before me, Stanley R. Norton personally appeared
the undersigned officer Daniel Wendin, President
Director of the Midpeninsula Regional Open Space District, known to me to be the persons described in the foregoing instrument, and acknowledged that they executed the same in the capacity therein stated and for the purposes therein contained.

In witness whereof I hereunto set my hand and official seal .

SSS
STf NLEY 2. i 7' d ? Notar Public
NOTARY FL' 5UC - :,_, i;;:: p`•alA

SANTA CLALA COU'
iTYcorrm: ir ... ta "" 19731(
4306407 Sherman Ave., Palo Alto, CA 9

Page 1 ends

2Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991516 DEQ 02-27-1981

Page 2 ends

2Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991516 DEQ 02-27-1981

Page 1 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981

Page 2 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981

Page 3 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981

Page 1 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981

Page 2 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981

Page 3 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981

Page 1 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981

Page 2 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981

Page 3 ends

3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981 Exhibit B - Existing Utility Easements

EXHIBIT C
Underground Utility Easement Legal Description & Plat Map WHEN RECORDED MAIL TO:

Midpeninsula Regional Open Space District
Attn: Real Property Department
5050 El Camino Real
Los Altos, CA 94022
Recording Requested By:

City of Palo Alto, Attn: Utilities Department
250 Hamilton Avenue, Palo Alto, CA 94301

NO TRANSFER TAX DUE
Public agency relinquishing any
interest previously recorded on
August 14, 1941 (Volume 1053, Page
538 & Volume 1048, Page 567) and
August 26, 1941 (Volume 1048, Page
562)

QUITCLAIM DEED

DULY RECORDED WITHOUT FEE
Pursuant to Government Code
Sections 6103, 27383 & 27388
APNs 351-25-014, 351-06-025, 351-09-002 and 351-12-069
For Valuable Consideration, receipt of which is hereby acknowledged, CITY OF PALO ALTO, a California chartered municipal corporation, does
Hereby REMISE, RELEASE AND QUITCLAIM to MIDPENINSULA REGIONAL OPEN SPACE DISTRICT, a Public District formed pursuant to Article 3 of Chapter 3 of Division 5 of the California Public Resources Code,
Any and all of its right, title and interest to erect, maintain and use overhead electrical and communications facilities, including poles, wires, guys, anchors, crossarms, hardware, braces and other fixtures, facilities or appliances, along with any rights of way therefore, including the following three (3) easements assigned in the Assignment from Pacific Gas and Electric Company to City of Palo Alto, Official Records of Santa Clara County, recorded on September 19, 1966, Book 7509, Page 170:

Grantor Date Recording
Louis Oneal, Inc. August 14, 1941 Volume 1053 of O.R., Page 538 Bertha A. Hayes August 14, 1941 Volume 1048 of O.R., Page 567 George F. Morell and
wife
August 26, 1941 Volume 1048 of O.R., Page 562
Being more particularly described in Exhibit “A” as attached hereto and incorporated by this reference.

City of Palo Alto
__________________________________
City Manager or Designee
Exhibit E - Form of Quitclaim Deed
Exhibit A

Page 1 ends

CITY OF PALO ALTO ACCESS AND UTILITY LICENSE AGREEMENT
This License Agreement (“License”) is made and entered into this day of , 2025 (“Agreement Date”) by and between Midpeninsula
Regional Open Space District, a California special district, hereinafter called “District,” and City of Palo Alto, a California chartered municipal corporation, hereinafter called “Licensee” or “City.” District and Licensee are sometimes referred to herein individually as a “Party” and collectively as the “Parties.”

RECITALS
WHEREAS, District is the owner of certain real property situated along Montebello Road at Monte Bello and Rancho San Antonio Open Space Preserves in the County of Santa Clara, State of California, known as Santa Clara County Assessor’s Parcel Numbers 351- 25-014, 351-06-025, 351-09-002 and 351-12-069, shown on Exhibit A, attached hereto and incorporated herein by this reference (“District Property”); and WHEREAS, Licensee holds right-of-way and utility easements for electric transmission lines across District Property, as assigned by Pacific Gas and Electric Company from Louis Oneal, Inc., Bertha Hayes, and George Morell (collectively, “Existing Utility Easements”), in the locations generally depicted on Exhibit A; and WHEREAS, Licensee wishes to convert its existing overhead electric lines and facilities to underground electric and communications lines and facilities along Montebello Road within District Property (the “Project”), which lines and facilities are generally shown on Exhibit B, attached hereto and incorporated herein by this reference; and WHEREAS, the Project will take place on District Property in the designated areas (the “License Area”) shown on the construction plans, specifications and best management practices approved by the City and District (collectively “Construction Plans”), which Construction Plans are attached hereto as Exhibit C, and incorporated herein by this reference; and
WHEREAS, Licensee and District are, in addition to this License, entering into an Exchange Agreement wherein the District will grant a new easement for Licensee’s underground utility facilities in exchange for Licensee quitclaiming to District its rights to maintain overhead utility facilities on the District Property (“Exchange”); and WHEREAS, Licensee and District desire to enter into this License to allow Licensee to commence work on the Project on District Property prior to the Exchange; NOW THEREFORE, District and Licensee agree:
1) Incorporation. The above Recitals and the exhibits attached to this License are hereby incorporated herein and made a part hereof.

Exhibit F - Form of License Agreement

Page 2 ends

2) License Area. District hereby grants to Licensee and its agents, consultants, contractors, subcontractors and employees a revocable, non-exclusive license to use those certain portions of District Property designated as the “License Area” on Exhibit C, subject to the terms and conditions contained herein. No other portion of the District Property shall be used by Licensee without the District’s prior written consent.

3) Term. This License shall become effective as of the Agreement Date and, unless earlier terminated pursuant hereto, shall expire on December 31, 2025 or upon closing of the Exchange, whichever comes first. Upon mutual agreement of the Parties, the term of this License may be extended in the event that the Project is not yet complete.

4) Use. The Licensee must use the License Area in strict accordance with this License.

a) Project Description. The Project includes the following general categories of work on the District Property (the “Work”): (1) installing and commissioning underground electrical and fiber optic communications lines and related facilities under, across and along Montebello Road via a boring construction method, where practicable, as it crosses District Property; (2) decommissioning, removal and disposal of all existing overhead electrical and communications lines, poles, and related fixtures and facilities currently installed on District Property; and (3) repairing and restoring the License Area to the condition that existed upon the Agreement Date, or as otherwise agreed upon in Construction Plans or this License, and to the extent damaged by Licensee, any portion of District Property outside the License Area. b) Licensee Responsibility for Project. Licensee agrees that it will, with respect to the District, be solely responsible for all aspects of the Project and for the acts and omissions of its agents, consultants, contractors, subcontractors, employees and invitees and for persons directly or indirectly employed by them.
c) Project Work. Licensee must perform the Work in accordance with the Construction Plans, unless the District pre-approves any changes in writing.

District will designate individuals with authority to approve such changes promptly to avoid work delays. If there is any impact to District Property outside the License Area, the Licensee must provide a detailed proposal to District identifying the extent and duration of the impact and the Licensee’s proposed plan to restore impacted District Property to its original condition or better prior to expiration of the License. The Licensee’s proposal is subject to the District’s prior written approval, which approval shall not be unreasonably withheld, delayed, or conditioned.
d) Compliance with Laws. The License Area shall not be used for any other purpose without District's prior written consent. Licensee shall not use the License Area or permit anything to be done in or about the License Area which will in any way conflict with any statute, ordinance, rule, regulation, or other statement of lawful governmental authority now in force or which may hereafter be promulgated (collectively “Regulations”), and shall at its own

Page 3 ends

expense abide by and comply with any and all such Regulations regulating the use of the License Area. Such Regulations shall be deemed to include the then-current “Ordinance for Use of Midpeninsula Regional Open Space District Lands,” which is incorporated into the License by this reference. e) Protection of District Property. District and City have conducted a site visit to identify District Property, improvements, or resources that may be affected by the Work. The Parties acknowledge, however, that not all portions of District Property that may be affected by the Work can be identified before the Project commences. Licensee is solely responsible for any damage to the License Area or other portions of District Property caused by Licensee or its agents, consultants, contractors, subcontractors, employees and invitees. Licensee shall protect District Property and improvements or resources from damage or loss, including vegetation, pathways, roadways, structures and utilities not designated for removal or alteration. Unless specified otherwise in the Construction Plans or through approved changes, Licensee shall repair or provide replacement for any such damage or loss to the District’s reasonable satisfaction, all at no cost to District. When Licensee is working in or around existing vegetation, Licensee shall take adequate measures to preserve and protect all vegetation that is to remain. Particular care must be taken not to debark trees, break limbs, or damage root systems.
f) Project Completion. When the Project is complete, Licensee shall request from District a final inspection of the Work. District shall make the final inspection within ten (10) calendar days of the request. If District determines that the Work has been completed in accordance with this License, District will accept the Project in writing. Upon acceptance, Licensee shall be relieved of maintaining and protecting the License Area. District’s acceptance shall not be unreasonably withheld, delayed, or conditioned. If District determines that the Work is not complete or in accordance with this License, Licensee shall be notified in writing of deficiencies and Licensee shall again initiate the procedure for final inspection after all such deficiencies are corrected.

Concurrently with District’s acceptance of the Work, Licensee shall provide District with a copy of the “as-built” drawings showing the installed location of the underground facilities for District’s reference.

5) Maintenance and Repair. Licensee acknowledges that it has inspected the License Area, and Licensee accepts the License Area “as is” in the condition existing at commencement hereof. Licensee recognizes that the District Property is open to the public for recreational uses and that Licensee’s work must be performed in such a manner as to accommodate public use on the District Property.

a) Licensee, at Licensee’s sole expense, shall maintain the License Area in a safe and sanitary condition, and good working order and repair, and shall keep the License Area free from trash and other debris for the duration of the Project. Site inspections of the License Area may be conducted by District to ensure that the License Area is properly maintained, but Licensee shall be responsible for initiating, maintaining and supervising all safety precautions and programs on the

Page 4 ends

Project. If the District determines that the License Area is not being maintained in accordance with this section, or if District notices any other issues that represent a breach of the License or threat to District Property or the public health, safety or welfare, District may suspend the Work and take actions necessary to remedy the issue. District shall not assume Licensee's responsibilities by such actions and does not thereby release Licensee from its obligations under this License. At the end of each workday, Licensee shall make the worksite safe for recreational use or shall provide the District with at least 24 hours’ advance written notice if the worksite cannot be made safe for recreational use; provided, however, that such notice shall not release Licensee from its obligation to maintain the License Area in a safe condition.
b) Licensee shall not obstruct roads or trails that are to remain open during construction and shall allow unencumbered access through Preserve gate entrances. Licensee shall not close or obstruct driveways, trails, or other public passageways without District’s permission. In the event that any road or trail needs to be closed in association with the Project, Licensee shall give District five (5) days’ written notice so that District may post the closure notice.

6) Alterations. Licensee shall not make or permit to be made any alterations, additions or improvements (“Alterations”) to or of the License Area, except those set forth in the Construction Plans, without the prior written consent of District.

7) Liens. Licensee shall keep the License Area free from any liens arising out of any work performed, materials furnished or obligations incurred by Licensee in connection with the Project.

8) Surrender of License Area. At least fifteen (15) days prior to the expiration or termination of the License, Licensee, at its sole cost and expense, shall: (1) remove all equipment, materials, tools or other personal property from the License Area; and (2) restore the License Area to the condition that existed upon the Agreement Date and repair any other portion of District Property disturbed or damaged by Licensee, as required by this License.

9) Waiver of Claims and Indemnification.

a) Licensee waives all claims against District for damage to property, including the Work and any Alterations thereto, and any equipment or machinery, and/or injury or death to persons occurring in, on, or about the District Property, from any cause arising at any time, except as may be caused by the District’s negligence or willful misconduct.
b) Each Party (the “Indemnitor”) shall indemnify, defend, and hold harmless the other Party (“Indemnitee”) and its officers, employees, agents, administrators, successors, and assigns, from and against any and all claims made or threatened by any third party and all related losses, expenses, damages, costs and liabilities, including reasonable attorneys' fees and expenses incurred in investigation or defense, to the extent the foregoing arise out of or relate to any error, negligent

Page 5 ends

act, omission or willful misconduct by the Indemnitor, its employees, agents, contractors, subcontractors or invitees.
c) The Indemnitee shall promptly notify the Indemnitor once it is aware of a potential action and shall cooperate with the Indemnitor in all reasonable respects in connection with the defense of any such action at the expense of the Indemnitor. The Indemnitor may, upon written notice to the Indemnitee, undertake to conduct all proceedings or negotiations in connection with the action, assume the defense thereof, including settlement negotiations in connection with the action, and will be responsible for the costs of such defense, negotiations and proceedings. The Indemnitor will have sole control of the defense and settlement of any claims for which it provides indemnification hereunder, provided that the Indemnitor will not enter into any settlement of such claim without the prior approval of the Indemnitee, which approval will not be unreasonably withheld, delayed, or conditioned. The Indemnitee shall have the right to retain separate counsel and participate in the defense of the action or claim at its own expense.

10) Insurance.
a) Licensee, at Licensee’s sole expense, shall maintain and keep in force during the term of this License a policy of general liability insurance against claims for bodily injury, personal injury, death and/or property damage arising from Licensee’s use of the License Area, or from any occurrence in, on, about, or related to the License Area with limits which shall not be less than Two Million Dollars ($2,000,000.00) per occurrence. District shall be named as an additional insured on such policy. Upon District’s request, City shall promptly furnish to District an endorsement evidencing such insurance coverage. Licensee shall require any contractors performing work on District Property to maintain insurance satisfying the above requirements. The District acknowledges that Licensee’s insurance requirements may be satisfied in whole or in part by adequately funded self-insurance programs or self-insured retentions that have been pre-approved by the District. Licensee agrees to furnish a certificate of its contractor(s)’s insurance to District, and evidence of any self-insurance program for Licensee coverage, naming District as an additional insured upon District’s request. All such liability insurance shall insure performance by Licensee of the indemnity provisions hereof, and the policy shall contain a cross-liability endorsement. No such policy of insurance shall be cancelable or subject to reduction of coverage or other modification except after thirty (30) days prior written notice. The limits of said insurance shall in no event be deemed to limit the liability of Licensee hereunder.

b) District shall have no obligation to insure against any loss to Licensee’s Improvements, fixtures, machinery, equipment, or other personal property in or about the License Area occurring from any cause whatsoever, and Licensee shall have no interest in the proceeds of any insurance carried by District.

11) Default.

Page 6 ends

a) The occurrence of any of the following shall constitute a material default of this License by Licensee:
(i) The abandonment of the License Area by Licensee; or (ii) After District provides Licensee written notice of a failure by Licensee to observe and perform any provision of this License to be observed or performed by Licensee, Licensee fails to cure such failure within fifteen (15) calendar days. If the failure cannot be cured within fifteen (15) calendar days, Licensee will not be in default of this License Agreement if Licensee commences performance of such cure within such fifteen (15) calendar day period and thereafter diligently prosecutes the same to completion.

b) In the event of any such material default by Licensee, and in addition to any other remedies available to District at law or in equity, this License and all rights of the Licensee hereunder shall be terminated upon delivery by District of notice of such termination to Licensee. Upon such termination, District may recover from Licensee any amount necessary to compensate District for all the detriment proximately caused by Licensee’s failure to perform Licensee’s obligations under this License or which in the ordinary course of things would be likely to result therefrom, including but not limited to all expenses incurred by District in connection with demolishing structures or removing facilities and debris, and removing any other property left by Licensee, on District Property.

c) In addition to the remedies provided above, in the event Licensee shall fail to perform any obligation to be performed by Licensee under this License, District may, but shall not be obligated to do so, perform or pay the same or cause the same to be performed or paid, and Licensee shall promptly upon demand by District therefore, reimburse to District all costs reasonably incurred by District in connection therewith.

12) Entry by District. District shall, at any and all reasonable times, have the right to enter onto the License Area to inspect the same, to post notices of non-responsibility, and to alter, improve or repair the License Area; provided, however, that District agrees not to alter, improve or repair areas under active construction without first obtaining Licensee’s written approval, which shall not be unreasonably withheld, conditioned or delayed, unless waiting for Licensee’s approval may result in unsafe conditions at the worksite. Licensee hereby waives any claim for damages for any loss of occupancy or quiet enjoyment of the License Area occasioned thereby.

13) Waiver. The waiver by District of any breach of any term, covenant, or condition herein contained shall not be deemed to be a waiver of such term, covenant, or condition or any subsequent breach of the same or any other term, covenant, or condition hereof.

14) A copy of this License Agreement shall be available on site at all times.

Page 7 ends

15) Notices. All notices, statements, demands, requests, approvals, or consents (collectively “notices”) given hereunder by either party to the other shall be made in writing and shall be served personally or by first class mail, certified or return receipt requested, postage prepaid, and addressed to the parties as follows:

District: Midpeninsula Regional Open Space District
Attn: Real Property Manager
5050 El Camino Real
Los Altos, CA 94022
(650) 691-1200 (telephone)
(650) 691-0485 (fax)

Licensee: City of Palo Alto
Attn: Utilities Electric Engineering
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2161

With a copy to

City of Palo Alto
Attn: Real Property Manager
250 Hamilton Avenue
Palo Alto, CA 94301

or to such other address as either party may have furnished to the other as a place for the service of notice. Any notice so served by mail shall be deemed to have been delivered three (3) days after the date posted.

16) No Property Interest. City shall not acquire any interest or estate in District’s property pursuant to this License. City has elected to commence the Project at its risk and only the Exchange will provide City with permanent rights to maintain the underground utility facilities on District Property.

17) Entire Agreement. This License along with any exhibits and attachments constitutes the entire agreement and between the Parties with respect to the matters herein. Any and all prior oral or written agreements by and between the Parties and their agents or representatives relative to the matters herein are superseded entirely by this License.

This License shall not be construed more strongly against either Party regardless of who is responsible for its preparation.

18) Parties Not Agents or Partners. Notwithstanding anything to the contrary in this License, neither Party shall be deemed an agent for the other Party under this License and the Parties shall not be deemed partners on the Project.

Page 8 ends

19) General.
a) This License contains all of the terms, covenants, and conditions agreed to by District and Licensee, and this License may not be modified orally or in any manner other than by an agreement in writing signed by all of the Parties to this License or their respective successors in interest.
b) When the context of this License requires, the masculine gender includes the feminine, a corporation, or a partnership, and the singular number includes the plural.
c) The captions of this License are for convenience only and are not a part of this License and do not in any way limit or amplify the terms and provisions of this License.
d) This License shall be governed and construed in accordance with the laws of the State of California with venue in the County of Santa Clara. e) Time is of the essence as to all of the provisions of this License as to which time of performance is a factor.
f) All terms, conditions or obligations in this License which by their nature are to be performed or observed following expiration or termination of this Agreement shall survive.
g) Neither Party may assign any part of this License without the other’s prior written consent.

Space intentionally left blank

Page 9 ends

IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed by their duly authorized officers to be effective as of the date of final execution by District in accordance with the terms hereof.

DISTRICT: LICENSEE:

MIDPENINSULA REGIONAL OPEN CITY OF PALO ALTO

SPACE DISTRICT

Ana M. Ruiz, General Manager City Manager or designee

Date Date

ATTEST: APPROVED AS TO FORM:

Maria Soria, District Clerk City Attorney or designee

Date:

APPROVED AS TO FORM:

Hilary Stevenson, General Counsel

Attachments
Exhibit A – Site Map
Exhibit B – Alignment Plan
Exhibit C – Construction Plans
Path: G:\Projects\a_Districtwide\Easements\Easements.aprxCreated By: acostanza While the District strives to use the best available digital data, these data do not represent a legal survey and are merely a graphic illustration of geographic features.

Midpeninsula Regional
O
pen Space District
(Midpen)
4/3/2025
0 0.250.125
Miles
I
Proposed underground utility easement
(
MROSD to grant to City of Palo Alto)
Other protected lands
Private property
Midpen preserves
Exhibit A - Site Map
!#

R A N C H O S A N

A N T O N I O O P E N

S P A C E P R E S E R V E

M O N T E B E L L O

O P E N S P A C E

P R E S E R V E
I n d
i a n
Cr eek
A d
ob e
Cr eek
Stev e n
s Cr eek
W
es t F
o r k A
dob e C r e e
k
Mon
tebello
Roa
d
Bella Vis ta Trail
Indian Creek Trail
Pag e Mil
l Tra
il Adob
e CreekTrail Black M
oun
tainTrail
SkidRoad Trail
Quarry T rail
O ld RanchTrail
CanyonTrail
Adobe C
reek Trai
l
Adobe Creek Trail
Steven
s Creek Nature Trail
Black
Mountain
2,812'
2200
2000
1800
2600
2400
2200
2000
2000
1800
2000
1800
2800
2800 2400
2000
2000
2000
1800
1600
2000
2000
35125014
3510900235106025
35112069

HIDDEN VILLA
!
!
!!
!
!
!
!
!
!
!
Area of detail

FOOTHILLS

LA HONDA
CREEK

LONG RIDGE

SARATOGA
GAP

THORNEWOOD

WINDY HILL

RANCHO SAN

ANTONIOCOAL CREEK

LOS TRANCOS
MONTE

BELLORUSSIAN RIDGE
ÄÆ35
ÄÆ84
ÄÆ9
ÄÆ280
Los Altos
Existing overhead utility easement
(
City of Palo Alto to vacate)
Trail
Unpaved all-season road
Unpaved seasonal road
Paved roadCounty parcel
NOTE: The easements shown are graphical
visualizations only; it is not an assessed interest.

For sur
veyed location of easements, reference
Cross Lands Surveying Inc. Project NO. 22-146
dated 3/15/2024.

Existing overhead electrical line
&
&
Easement 1
&
&
Easement 2
&
&
Easement 3
1260

MONTE BELLO ROAD
3 2-1/0 AL
F8A ELF772
7498
55' 50'
6770
50'
6768
50'
6769
50'
6771
45'
6772
10 6461
F
P
P
P
PP
P
PP
P
P
P
P
S
TX PAD54" x60"
PPPPP
P
600'
700'
12'
60'
F
PB40409
3'X5'

FIBER BOX
30"X48"
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P

135'
P
P
P
P
P
P
P
P
P
P
P

P
P 550'PB40416
3'X5'

FIBER BOX
30"X48"
LB30070
LB VAULT - 3'X5'
LB PAD - 4'X6'
500'500'
16 17
18 19
20 F

FIBER BOX
30"X48"
Public
Utility
Easement
20' Wide

UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto

APPROVED
SR. ENGINEER / MANAGER
ENGR.

CHKD.

DRWN
CKT #MAP # SCALE
DATE APPR.

SHEET
W.O.# / DRAWING #
OF

DESCRIPTION
California 40027598

FOOTHILL FIRE MITIGATION PROJECT
PHASE 4

MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
---- HV-20
5 10
LOCATION 17 - LB30070

INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30070
1 - 4' X 6' LOAD BREAK PAD 30070
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE

FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 18 - PB40406

INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40406

WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE

FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 19 - XFMR PAD

INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 20 - PB40409

INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40409

WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE

FIBER BOX WITH FULL TRAFFIC TOP

CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 16 & 17
~550' - 2-3.63" PRIMARY CONDUIT FROM NEW
PB 40416 TO NEW LB 30070
~550' - 1- 3.63" FIBER CONDUIT FROM NEW

FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 17 & 18
~275' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB30070 TO NEW PB 40406
~275' - 1- 3.63" FIBER CONDUIT FROM NEW

FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 18 & 19
~10' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40406 TO NEW XFMR PAD
BETWEEN LOCATION 19 & 19A
~60' - 1-3.63" SECONDARY CONDUIT FROM

NEW XFMR PAD TO EXISTING JUNCTION
BOX
BETWEEN LOCATION 17 & 20
~700' - 2-3.63" PRIMARY CONDUIT FROM NEW
LB 30070 TO NEW PB 40409
~700' - 1- 3.63" FIBER CONDUIT FROM NEW

FIBER BOX TO NEW FIBER BOX
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL

APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED

FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman
Exhibit B - Alignment Plan

MONTE BELLO ROAD
2-#6 COPPERWELD
2-#6 COPPERWELD
50'6771
45'6772
50'6773
45'6774
F
F

PPPPPPPPPPPPPP
P

PPPPPPPPPPPPPP
PB404033'X5'
PB404053'X5'
600'
600'
600'
FIBER BOX30"X48"
FIBER BOX30"X48"
FPB404043'X5'FIBER BOX30"X48"PPPPPPPPPPPPPP
F
PB404093'X5'FIBER BOX30"X48"PPPPPPPP
20 21
22 23
UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4MP NEXTLEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-206 10
LOCATION 20 - PB40409INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40409WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 21 - PB40405INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40405WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 22 - PB40404INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40404WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 23 - PB40403INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40403WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 20 & 21~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40409 TO NEW PB 40405~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 21 & 22~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40405 TO NEW PB 40404~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 22 & 23~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40404 TO NEW PB 40403~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

MONTE BELLO ROAD

MONTE BELLO ROAD
2-#6 COPPERWELD
2-#6 COPPERWELD
45'6774
45'6775
45'6776
40'6777
45'6778
45'6779
40'6781
45'6780
45'6784
F

F
PP
F

PPPPPPPP
F

PPPPPPPPP

F

PPPPPPP

PPPPPPPPP

PB403993'X5'
PB404003'X5'
PB404013'X5'
PB404023'X5'
PB404033'X5'
600'
600'
600'
600'
FIBER BOX30"X48"
FIBER BOX30"X48"
FIBER BOX30"X48"
FIBER BOX30"X48"
FIBER BOX30"X48"

PPPPPPPPP
600'
23 24
25 26
27 UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4MP NEXTLEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-207 10
LOCATION 24 - PB40402INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40402WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 25 - PB40401INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40401WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 26 - PB40400INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40400WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 24 & 25~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40402 TO NEW PB 40401~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 25 & 26~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40401 TO NEW PB 40400~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 26 & 27~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40400 TO NEW PB 40399~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

3 #2 TRI 2-#6 COPPERWELD
2-#6 COPPERWELD
45'6794
40'6796
45'6780
45'6784 45'6785

POLESERVICE
40'6787
35'6793
30'678950'6788
45'6791
106467
154503
F
P
F

PPPPPPPPPPPPPPPPPPPP
F
SS

TX PAD54"X60"
PB403953'X5'PB403963'X5'
PB403993'X5'
LB30060LB VAULT - 3'X5'LB PAD - 4'X6'
380'
95'575'600'85'
FIBER BOX30"X48"FIBER BOX30"X48"
25'
FIBER BOX30"X48"
PB403973'X5'

SSSSSSSSSSSSSS
585'
10'
2 - 3.63"

PPPPPPPPPPPPPPP

600'
F
PPPPPPPPPFIBER BOX30"X48"
BOX24"X36"
27 28
293030A
30B
30C
31 32 33
UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4MP NEXTLEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-208 10
LOCATION 27 - PB40399INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40399WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 28 - LB30060INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3'X 5' LOAD BREAK PAD 300601 - 3' X 5' LOAD BREAK PAD 30060LOCATION 29 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 30INSTALL1 - 24" X 36" JUNCTION BOXLOCATION 30B - PB40397INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40397WITH FULL TRAFFIC COVERLOCATION 31INSTALL1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 32 - PB40396INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40396WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 26 & 27~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40400 TO NEW PB 40399~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 27 & 28~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40399 TO NEW LB 30060BETWEEN LOCATION 28 & 29~25' - 1 -3.63" PRIMARY CONDUIT FROM NEWLB 30060 TO NEW XFMR PADBETWEEN LOCATION 29 & 30~10' - 4-3.63" SECONDARY CONDUIT FROMNEW 54" X 60" XFMR PAD TO NEW 24" X 36"JUNCTION BOXBETWEEN LOCATION 30 & 30A~95' - 1-3.63" SECONDARY CONDUIT FROMNEW 24" X 36" JUNCTION BOX TO EXISTINGJUNCTION BOXBETWEEN LOCATION 30 & 30B~585' - 1-3.63" SECONDARY CONDUIT FROMNEW 24" X 36" JUNCTION BOX TO NEW PB40397BETWEEN LOCATION 30B & 30C~6' - 1 - 3.63" SECONDARY CONDUIT FROMPB 40397 TO NEW 3" RISERBETWEEN LOCATION 30 & 32~400'- 1-3.63" PRIMARY CONDUIT FROM NEWLB 30060 TO NEW PB 40396BETWEEN LOCATION 27 & 31~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 31 & 32~400' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 32 & 33~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40396 TO NEW PB 40395~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX****NOTE****THE SCOPE OF WORK BETWEEN LOCATION30, 30B, & 30C MAY BE REMOVED AS OPENSPACE MAY NOT NEED CPAU ELECTRICSERVICE

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

2-#6 COPPERWELD
45'6797
F
F

PB403953'X5'
600'
FIBER BOX30"X48"

PPPPPPPPPPPPPP

PPPPPPPPPPP

600' 33
34 1719172117231725MONTE BELLO ROAD
N48PB10612-#4 ACSRTRI2-#4 ACSRF6AELF773679845'
40'6799PPPPPPPPPPPP
40'6800
F
TX PAD54"X60"LB30059LB VAULT - 3'X5'LB PAD - 4'X6'
125'125'
FIBER BOX30"X48"
5' PPPP

3536
3737ASS
SS
125'
PB403943'X5'FIBER BOX30"X48"
5'

UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECT PHASE 4MP NEXTLEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-209 10
LOCATION 33 - PB40395INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40395WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 34 - PB40394INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40394WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 35 - LB30059INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'X 6' LOAD BREAK PAD 300591 - 4' X 6' LOAD BREAK PAD 300591 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 36 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 37INSTALL1 - 24" X 36" JUNCTION BOXLOCATION 37AINSTALL1 - 3" RISERLOCATION 37BINSTALL1 - 24" X 36" JUNCTION BOXLOCATION 37CINSTALL1 - 3" RISER CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 33 & 34~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40395 TO NEW PB 40394~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 34 & 35~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40394 TO NEW LB 30059 ~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 35 & 36~5' - 1-3.63" PRIMARY CONDUIT FROM NEWLB 30059 TO NEW XFMR PADBETWEEN LOCATION 36 & 37~125' - 1-3.63" SECONDARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 SECONDARYBOX ~125' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW 24X36 SECONDARY BOXBETWEEN LOCATION 37 & 37A~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6799BETWEEN LOCATION 37 & 37B~125' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOXBETWEEN LOCATION 37B & 37C~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6800

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

1741
1757
17231725 17271729
2-#4 ACSRTRI2-#4 ACSR

OPEN WIRE
2-#4 ACSR
2-#4 ACSR
33-#2 STR CU
35'6801
35'6802
35'6803
35'6804
40'6805
40'6806
257747 257599
SET AT TAP "B"37.5780597.5%

PPPPPPPPPPPPPP
40'6800

SSSF F

TX PAD54"X60"
PB403913'X5'
PB403923'X5'
BOX24"X36"600'
175'
600'
FIBER BOX30"X48"
FIBER BOX30"X48"
TX PAD54"X60"

7'
25'5'
15'

PPPPPPPPPPPPPP
FPB404083'X5'FIBER BOX30"X48"PPPPPP

375'
37 38
39 40
4141A41B
42 37BSS125'
42B
5'37C

15'42A
UTILITIES, ELECTRIC ENGINEERINGCity of Palo Alto
APPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALE DATEAPPR.

SHEETW.O.# / DRAWING #OF

DESCRIPTION
California40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4MP NEXT LEVEL SUBSTRUCTUREP.VALATHP.VALATH P.VALATHV.RIOS NTS----HV-201010
LOCATION 36 - TX PADINSTALL1 - 54" X 60" XFMR PADLOCATION 37INSTALL1 - 24" X 36" JUNCTION BOXLOCATION 37AINSTALL1 - 3" RISERLOCATION 37BINSTALL1 - 24" X 36" JUNCTION BOXLOCATION 37CINSTALL1 - 3" RISERLOCATION 38 - PB40408INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40408WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 39 - PB40392INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40392WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 40 - PB40391INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40391WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 41 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 41AINSTALL1 - 24" X 36" JUNCTION BOXLOCATION 41B - POLE 6805INSTALL1 - 3" RISERLOCATION 42INSTALL1 - 24" X 36" JUNCTION BOXLOCATION 42A - EXISTINGJUNCTION BOXLOCATION 42B - POLE 6806INSTALL1 - 3" RISER CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 35 & 36~5' - 1-3.63" PRIMARY CONDUIT FROM NEWLB 30059 TO NEW TX PADBETWEEN LOCATION 36 & 37~125' - 1-3.63" SECONDARY CONDUIT FROMNEW TX PAD TO NEW 24X36 SECONDARYBOX ~125' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW 24X36 SECONDARY BOXBETWEEN LOCATION 37 & 37A~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6799BETWEEN LOCATION 37 & 37B~125' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOXBETWEEN LOCATION 37B & 37C~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6800BETWEEN LOCATION 35 & 38~270' - 1-3.63" PRIMARY CONDUIT FROM NEWLB30059 TO NEW PB 40408~270' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 38 & 39~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40408 TO NEW PB 40392~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 39 & 40~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40392 TO NEW PB 40391~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 40 & 41~15' - 1 -3.63" PRIMARY CONDUIT FROM NEWPB 40391 TO NEW XFMR PADBETWEEN LOCATION 41 & 41A~25' - 1 - 3.63" SECONDARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 JUNCTIONBOXBETWEEN LOCATION 41A & 41B~5' - 1 - 3.63" SECONDARY CONDUIT FROMNEW JUNCTION BOX TO NEW 3" RISERBETWEEN LOCATION 41 & 42~105' - 1 -3.63" PRIMARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 JUNCTIONBOX~105' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW 24X36 JUNCTION BOXBETWEEN LOCATION 42 & 42A~15' - 1 - 3.63" SECONDARY CONDUIT FROMNEW 24X36 JUNCTION BOX TO EXISTINGJUNCTION BOXBETWEEN LOCATION 42A & 42A~5' - 1 - 3" RISER FROM NEW 24X36JUNCTION BOX TO EXISTING POLE

LEGEND-RED- NEW, INSTALL ELECTRICAL-MAGENTA- NEW, INSTALL FIBER-GREEN - REMOVE-BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTILAPPROVAL FROM CPAU ENGINEERING FOREASEMENT RELOCATION. DRAWINGS INCLUDEDFOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman
Brandon Grossman

UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto

APPROVED
SR. ENGINEER / MANAGER
ENGR.

CHKD.

DRWN
CKT #MAP # SCALE
DATE APPR.

SHEET
W.O.# / DRAWING #
OF

DESCRIPTION
California 40027598

FOOTHILL FIRE MITIGATION PROJECT
PHASE 4

TITLE SHEET
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
---- HV-20
1 27
26 F
Exhibit C - Construction Plans

PPPPPPP
50'6768
50'6769
F
STX PAD54" x60"PPPPPPPP5'30' PPP
135'

PPPPPPPPPPPPPPPPPPPPPPP
550'PB403963'X5'FIBER BOX30"X48"
LB30070LB VAULT - 3'X5'LB PAD - 4'X6'
500'500'
16 171819
FFIBER BOX30"X48"
PublicUtilityEasement20' Wide

UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-20227 WORK DONE PREVIOUSLY TOLOCATION 17, 18, AND 19. FURTHERWORK REQUIRES EASEMENT FROMMID-PENINSULA OPEN SPACE.THESE DRAWINGS AREOVERLAYED ON THE MOST RECENTSURVEY OF THE AREA DATED3.15.2024. THIS DRAWING PACKAGEHAS REMOVED PREVIOUSLYFINISHED WORK FROM SCOPE.THIS PHASE OF THE PROJECTWILL BEGIN FROM LOCATION 17AND END AT LOCATION 42A.LOCATION 16 - PB40396INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40396WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 17 - LB30070INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'X 6' LOAD BREAK PAD 300701 - 4' X 6' LOAD BREAK PAD 300701 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 18 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 19 - STUB OUTINSTALLINSTALL CONDUIT TO EXISTING VAULT NEARPOLESTUB OUT CONDUIT OUTSIDE OFRESERVOIR GATE CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 16 & 17~550' - 2-3.63" PRIMARY CONDUIT FROM NEWPB 40416 TO NEW LB 30070~550' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 17 & 18~5' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40406 TO NEW XFMR PADBETWEEN LOCATION 18 & 19~30' - 1-3.63" SECONDARY CONDUIT FROMNEW XFMR PAD TO EXISTING JUNCTIONBOX~60' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO STUB OUTBETWEEN LOCATION 17 & 20~700' - 2-3.63" PRIMARY CONDUIT FROM NEWLB 30070 TO NEW PB 40409~700' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP). 1260 MONTE BELLO ROAD50'6769
STX PAD54" x60"PPPPPPPP
700'
5'30'

PPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
135'PPPPPPLB30070LB VAULT - 3'X5'LB PAD - 4'X6'171819
FFIBER BOX30"X48"

MATCHLINE AMATCHLINE A

PROPOSEDBORE PIT 2PROPOSEDBORE PIT 1TEMPORARYSTAGINGAREA 1PROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-20327 WORK DONE PREVIOUSLY TOLOCATION 17, 18, AND 19. FURTHERWORK REQUIRES EASEMENT FROMMID-PENINSULA OPEN SPACE.THESE DRAWINGS AREOVERLAYED ON THE MOST RECENTSURVEY OF THE AREA DATED3.15.2024. THIS DRAWING PACKAGEHAS REMOVED PREVIOUSLYFINISHED WORK FROM SCOPE.THIS PHASE OF THE PROJECTWILL BEGIN FROM LOCATION 17AND END AT LOCATION 42A.LOCATION 17 - LB30070INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'X 6' LOAD BREAK PAD 300701 - 4' X 6' LOAD BREAK PAD 300701 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 18 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 19 - STUB OUTINSTALLINSTALL CONDUIT TO EXISTING VAULT NEARPOLESTUB OUT CONDUIT OUTSIDE OFRESERVOIR GATE CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 16 & 17~550' - 2-3.63" PRIMARY CONDUIT FROM NEWPB 40416 TO NEW LB 30070~550' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 17 & 18~5' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40406 TO NEW XFMR PADBETWEEN LOCATION 18 & 19~30' - 1-3.63" SECONDARY CONDUIT FROMNEW XFMR PAD TO EXISTING JUNCTIONBOX~60' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO STUB OUTBETWEEN LOCATION 17 & 20~700' - 2-3.63" PRIMARY CONDUIT FROM NEWLB 30070 TO NEW PB 40409~700' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP).

MONTE BELLO ROAD50'677145'6772
F

PPPPPPPPPPPPPPPPPPPPPPPPPPPPP
PB404053'X5'
600'
FIBER BOX30"X48"PPPPP
FPB404093'X5'FIBER BOX30"X48"PPPPPPP
20 21MATCHLINE AMATCHLINE AMATCHLINE BMATCHLINE BPROPOSEDBORE PIT 3PROPOSEDBORE PIT 2EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIREDPROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-20427 LOCATION 20 - PB40409INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40409WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 21 - PB40405INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40405WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 17 & 20~700' - 2-3.63" PRIMARY CONDUIT FROM NEWLB 30070 TO NEW PB 40409~700' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 20 & 21~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40409 TO NEW PB 40405~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP). 50'6773PPPPPPPPPPPPPPP

600'
600'
FPB404043'X5'FIBER BOX30"X48"

PPPPPPPPPPPPPPPPPPPPPPPP
22 MATCHLINE BMATCHLINE B

MATCHLINE CMATCHLINE C
OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 4AND 5PROPOSEDBORE PIT 4EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)PROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-20527 LOCATION 22 - PB40404INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40404WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPCPAU CONDUIT INSTALLATIONBETWEEN LOCATION 21 & 22~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40405 TO NEW PB 40404~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 22 & 23~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40404 TO NEW PB 40403~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP). 45'6774
45'6775
F

PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP

PB404033'X5'
600'
FIBER BOX30"X48"23

MATCHLINE CMATCHLINE C

MATCHLINE DMATCHLINE D
PROPOSEDBORE PIT 5OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 4AND 5EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-20627 LOCATION 23 - PB40403INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40403WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPCPAU CONDUIT INSTALLATIONBETWEEN LOCATION 22 & 23~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40404 TO NEW PB 40403~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 23 & 24~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40403 TO NEW PB 40402~600' - 1- 3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP).

MONTE BELLO ROAD
45'6776

PPPPPPPPPPPPPPPPPPPPPP

F
PPPPPPPPPPPPPPPPPPB404023'X5'
600'
600'FIBER BOX30"X48"24
MATCHLINE DMATCHLINE DMATCHLINE EMATCHLINE EPROPOSEDBORE PIT 6EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIREDPROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-20727 LOCATION 24 - PB40402INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40402WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPCPAU CONDUIT INSTALLATIONBETWEEN LOCATION 24 & 25~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40402 TO NEW PB 40401~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 25 & 26~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40401 TO NEW PB 40400~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP).

MONTE BELLO ROAD40'6777
45'6778
45'6779
F
F
PPPPP

PPPPPPP
PB404003'X5'
PB404013'X5'
FIBER BOX30"X48"
FIBER BOX30"X48"

PPPPPPPPPPPPPPPPPPPPPPPPPPP
600'
25 26

MATCHLINE EMATCHLINE E
MATCHLINE FMATCHLINE FPROPOSEDBORE PIT 8
PROPOSEDBORE PIT 7TEMPORARYSTAGINGAREA 2

PROPOSED
OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 8AND 9EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-20827 LOCATION 25 - PB40401INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40401WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 26 - PB40400INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40400WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 24 & 25~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40402 TO NEW PB 40401~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 25 & 26~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40401 TO NEW PB 40400~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 26 & 27~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40400 TO NEW PB 40399~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP). 45'6779
40'6781
45'6780
F

PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP

PB403993'X5'
600'
FIBER BOX30"X48"
FIBER BOX30"X48"
27 MATCHLINE FMATCHLINE F
MATCHLINE GPROPOSEDBORE PIT 9
OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 8AND 9
OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 8AND 9
PROPOSEDBORE PIT 8
EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIRED PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-20927 LOCATION 27 - PB40399INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40399WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPCPAU CONDUIT INSTALLATIONBETWEEN LOCATION 26 & 27~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40400 TO NEW PB 40399~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 27 & 28~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40399 TO NEW LB 30060 CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP). 40'678730'678950'6788
F

PPPPPPPPPPPPPPPPP

TX PAD54"X60"
PB403963'X5'
LB30060LB VAULT - 3'X5'LB PAD - 4'X6'
450'
95'575'600'
FIBER BOX30"X48"
2 - 3.63"P

PPPPPPPPPPPP
F
PPPPPPPPPPPPPPPPPPPPFIBER BOX30"X48"SECONDARYBOX24"X36"282930 31 32
3RD PARTYSERVICE POLEMATCHLINE GMATCHLINE G

MATCHLINE HMATCHLINE H
SSS40'20'POLE 6789 AND 3RDPARTY SERVICEPOLE INTENDING TOREMAIN. WILL BEOWNED BY 3RDPARTY PROPOSEDBORE PIT 11PROPOSEDBORE PIT 10TEMPORARYSTAGINGAREA 3 EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENTEXTENSION FORPROPOSEDEQUIPMENT 20'X40'EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIREDEASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)

PROPOSED EASEMENT
PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201027 LOCATION 28 - LB30060INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3'X 5' LOAD BREAK PAD 300601 - 3' X 5' LOAD BREAK PAD 300603 - BOLLARDSLOCATION 29 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 30 - SECONDARY BOXNO SUBSTRUCTURE WORK TO BEPERFORMED. BOX MAY REQUIREREPLACEMENT.LOCATION 31 - FIBER BOXINSTALL1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 32 - PB40396INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40396WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 27 & 28~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40399 TO NEW LB 30060BETWEEN LOCATION 28 & 29~25' - 1 -3.63" PRIMARY CONDUIT FROM NEWLB 30060 TO NEW XFMR PADBETWEEN LOCATION 29 & 30~30' - 1-3.63" SECONDARY CONDUIT FROMNEW 54" X 60" XFMR PAD TO EXISTINGSECONDARY BOXBETWEEN LOCATION 28 & 32~450'- 1-3.63" PRIMARY CONDUIT FROM NEWLB 30060 TO NEW PB 40396BETWEEN LOCATION 27 & 31~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 31 & 32~450' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 32 & 33~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40396 TO NEW PB 40395~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX****NOTE****THE SCOPE OF WORK TO BRING POWER TOPUMP NEAR "BACKPACK CAMP" ISREMOVED. POLE LINE TO BE ENTIRELYREMOVED TO THAT PUMP.PROPOSED EASEMENT DIMENSION TO BE20'X40' AS SHOWN ON PLAN. FIELDCONDITIONS MAY DICTATE AN ALIGNMENTADJUSTMENT CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP).

F

PB403953'X5'600'FIBER BOX30"X48"PPPPPPPPPPPPPPPPPPPPP

PPPPPPPPPPPPPPPPP
600' 33MATCHLINE HMATCHLINE HMATCHLINE IMATCHLINE IPROPOSEDBORE PIT 13PROPOSEDBORE PIT 12 EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIREDPROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECT PHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201127 LOCATION 33 - PB40395INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40395WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPCPAU CONDUIT INSTALLATIONBETWEEN LOCATION 32 & 33~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40396 TO NEW PB 40395~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 33 & 34~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40395 TO NEW PB 40394~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP). 45'6797
F

PPPPPPPPP34
1719172117231725MONTE BELLO ROAD679845'40'6799

PPPPPPPPPPPPPPPPPPPPPPPPPPPP
40'6800
F
TX PAD54"X60"LB30059LB VAULT - 3'X5'LB PAD - 4'X6'
125'
FIBER BOX30"X48"5'

PPPPPPPPPPPPPP

375'
3536
3737A37BSSSSSS
SSSSSS
125'
PB403943'X5'FIBER BOX30"X48"
5' 5'37C

MATCHLINE IMATCHLINE IMATCHLINE JMATCHLINE J
40'20'
10' WIDEEASEMENT
EASEMENT EXTENSIONFOR PROPOSEDEQUIPMENT 20'X40'
POLE 6799 AND 6800POLE INTENDING TOREMAIN. CO-OWNEDBY CPAU AND AT&T,EXISTING ELECTRICSERVICE DROPS TOBUILDINGS ON SITEPROPOSEDBORE PIT 16PROPOSEDBORE PIT 15 PROPOSEDBORE PIT 14
TEMPORARYSTAGINGAREA 4
EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)

EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIRED
PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECT PHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201227 LOCATION 34 - PB40394INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40394WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 35 - LB30059INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'X 6' LOAD BREAK PAD 300591 - 4' X 6' LOAD BREAK PAD 300593 - BOLLARDS1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 36 - XFMR PADINSTALL1 - 54" X 60" XFMR PADLOCATION 37 - SECONDARY BOXINSTALL1 - 24" X 36" SECONDARY BOXLOCATION 37A - POLE 6799INSTALL1 - 3" RISERLOCATION 37B - SECONDARYINSTALL1 - 24" X 36" SECONDARY BOXLOCATION 37C - POLE 6800INSTALL1 - 3" RISER CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 33 & 34~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40395 TO NEW PB 40394~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 34 & 35~600' - 1-3.63" PRIMARY CONDUIT FROM NEWPB 40394 TO NEW LB 30059 ~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 35 & 36~5' - 1-3.63" PRIMARY CONDUIT FROM NEWLB 30059 TO NEW XFMR PADBETWEEN LOCATION 36 & 37~125' - 1-3.63" SECONDARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 SECONDARYBOX ~125' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW 24X36 SECONDARY BOXBETWEEN LOCATION 37 & 37A~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6799BETWEEN LOCATION 37 & 37B~125' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW24X36 SECONDARY BOX TO NEW 24X36SECONDARY BOXBETWEEN LOCATION 37B & 37C~5' - 1-3.63" SECONDARY CONDUIT FROMNEW 24X36 SECONDARY BOX TO POLE 6800BETWEEN LOCATION 35 & 38~375' - 1-3.63" PRIMARY CONDUIT FROM NEWLB30059 TO NEW PB 40408~375' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP). 17271729
35'680135'6802
35'6803
35'6804PPPPPPPPPPPP
F
PB403923'X5'
600'
600'
FIBER BOX30"X48"

PPPPPPPPPPPPPPPPPPPPPPPPPPPP
FPB404083'X5'FIBER BOX30"X48"
PPPPP 38
39 MATCHLINE J

MATCHLINE KMATCHLINE K
POLE 6799 AND 6800POLE INTENDING TO
PROPOSEDBORE PIT 18
PROPOSEDBORE PIT 17
EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIREDPROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201327 LOCATION 38 - PB40408INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40408WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 39 - PB40392INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40392WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 35 & 38~375' - 1-3.63" PRIMARY CONDUIT FROM NEWLB30059 TO NEW PB 40408~375' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 38 & 39~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40408 TO NEW PB 40392~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 39 & 40~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40392 TO NEW PB 40391~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP). 1741 175733-#2 STR CU
40'680540'6806PPPPPPPPPPPPPPPPP

SSSSSSSF
PB403913'X5'SECONDARYBOX24"X36"150'FIBER BOX30"X48"SSSSSSSTX PAD54"X60" 7'P
5' 404141A41B
424215'P42
MATCHLINE KMATCHLINE K20'20'EASEMENT EXTENSIONFOR PROPOSEDEQUIPMENT 20'X20' POLE 6805 AND 6806POLE INTENDING TOREMAIN. OWNED BYCPAU, EXISTINGELECTRIC SERVICEDROPS TOBUILDINGS ON SITE150'PROPOSEDBORE PIT 19PROPOSEDBORE PIT 20SECONDARYBOX24"X36"EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONFOR PROPOSEDEQUIPMENT 20'X20'
EASEMENT EXTENSIONFOR PROPOSEDEQUIPMENT 20'X20'
PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4SUBSTRUCTUREB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201427 LOCATION 40 - PB40391INSTALL1 - 3' X 5' CPA3546 PRIMARY VAULT #40391WITH FULL TRAFFIC COVER1 - 30" X 48" PG3048 OR SIMILAR INNER SIZEFIBER BOX WITH FULL TRAFFIC TOPLOCATION 41 - XFMR PADINSTALL1 - 54" X 60" XFMR PAD3 - BOLLARDSLOCATION 41A - SECONDARY BOXINSTALL1 - 24" X 36" SECONDARY BOXLOCATION 41B - POLE 6805INSTALL1 - 3" RISERLOCATION 42 - SECONDARY BOXINSTALL1 - 24" X 36" SECONDARY BOX (INSTALLOUTSIDE FENCE)LOCATION 42A - EXISTINGJUNCTION BOXLOCATION 42B - POLE 6806INSTALL1 - 3" RISER CPAU CONDUIT INSTALLATIONBETWEEN LOCATION 39 & 40~600' - 1 -3.63" PRIMARY CONDUIT FROMNEW PB 40392 TO NEW PB 40391~600' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW FIBER BOXBETWEEN LOCATION 40 & 41~15' - 1 -3.63" PRIMARY CONDUIT FROM NEWPB 40391 TO NEW XFMR PADBETWEEN LOCATION 41 & 41A~25' - 1 - 3.63" SECONDARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 JUNCTIONBOXBETWEEN LOCATION 41A & 41B~5' - 1 - 3.63" SECONDARY CONDUIT FROMNEW JUNCTION BOX TO NEW 3" RISERBETWEEN LOCATION 41 & 42~105' - 1 -3.63" PRIMARY CONDUIT FROMNEW XFMR PAD TO NEW 24X36 JUNCTIONBOXBETWEEN LOCATION 40 & 42~105' - 1-3.63" FIBER CONDUIT FROM NEWFIBER BOX TO NEW 24X36 JUNCTION BOXBETWEEN LOCATION 42 & 42A~15' - 1 - 3.63" SECONDARY CONDUIT FROMNEW 24X36 JUNCTION BOX TO EXISTINGJUNCTION BOXBETWEEN LOCATION 42A & 42A~5' - 1 - 3" RISER FROM NEW 24X36JUNCTION BOX TO EXISTING POLE CONSTRUCTION NOTES:1.ALL OPEN EXCAVATIONS REQUIRETRENCH PLATES AND PROPERDELINEATIONS AT THE END OFEVERY DAY.2.COMPACT AND BACKFILL ANYOPEN EXCAVATION PER CITY OFPALO ALTO STANDARDDT-SS-U-1003 NOTE 8. BACKFILL INUNIMPROVED AREAS3.SEE APPENDIX FOR DETAILSREGARDING BEST MANAGEMENTPRACTICES (BMP).

PAC BELL METER4X4PB11862-#6 COPPERWELD & 1-#6 B CU1/0 AL TRI50'6767

PPPPPPPPPPPPPPPPPPPPPPP
42013-#2 AL PRI
50'6768
150120/208Y6024
F

PPPPPPPPP
550'PB403963'X5'FIBER BOX30"X48"
500'500'PublicUtilityEasement20' Wide
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201527 LOCATION 1CPAU POLE 6767REMOVE3 - 8' CROSSARMS1 - 10' CROSSARMS4 - BELLS6 - D.E. INSULATORS6 - CUTOUTS3 - FUSESTOP WOOD POLELOCATION 2CPAU POLE 6768REMOVE1 - 50' WOOD POLE2 - 8' CROSSARMS4 - BELLS CPAU CABLE REMOVALBETWEEN LOCATION 1 & 2~630' - 3-1/0 AL WIRE FROM POLE 6767 TOPOLE 6768BETWEEN LOCATION 2 & 3~350' - 3-1/0 AL WIRE FROM POLE 6768 TOPOLE 67691 2 1260 MONTE BELLO ROAD50'6769
STX PAD54" x60"PPPPPPPP
700'
5'30'

PPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
135'PPPPPPLB30070LB VAULT - 3'X5'LB PAD - 4'X6'
FFIBER BOX30"X48"

MATCHLINE AMATCHLINE A

PROPOSEDBORE PIT 2PROPOSEDBORE PIT 1TEMPORARYSTAGINGAREA 1PROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201627 LOCATION 3CPAU POLE 6769REMOVE1 - 50' WOOD POLE4 - 8' CROSSARMS2 - FUSES16 - D.E. INSULATORS4 - CUTOUTS1 - GUY ANCHORSCPAU CABLE REMOVALBETWEEN LOCATION 2 & 3~350' - 3-1/0 AL WIRE FROM POLE 6768 TOPOLE 6769BETWEEN LOCATION 3 & 4~460' - 3-1/0 AL WIRE FROM POLE 6769 TOPOLE 6771 3 MONTE BELLO ROAD50'677145'6772
F

PPPPPPPPPPPPPPPPPPPPPPPPPPPPP
PB404053'X5'
600'
FIBER BOX30"X48"PPPPP
FPB404093'X5'FIBER BOX30"X48"PPPPPPP
MATCHLINE AMATCHLINE AMATCHLINE BMATCHLINE BPROPOSEDBORE PIT 3PROPOSEDBORE PIT 2EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIREDPROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201727 LOCATION 4CPAU POLE 6771REMOVE1- 50' WOOD POLE1 - 8' CROSSARMS2 - BELLSLOCATION 5CPAU POLE 6772REMOVE1 - 45' WOOD POLE2 - 8' CROSSARMS4 - BELLS1 - GUY ANCHORS CPAU CABLE REMOVALBETWEEN LOCATION 3 & 4~460' - 3-1/0 AL WIRE FROM POLE 6769 TOPOLE 6771BETWEEN LOCATION 4 & 5~340' - 3-1/0 AL WIRE FROM POLE 6771 TOPOLE 6772BETWEEN LOCATION 5 & 6~700' - 3-1/0 AL WIRE FROM POLE 6772 TOPOLE 6773 4 5
50'6773PPPPPPPPPPPPPPP

600'
600'
FPB404043'X5'FIBER BOX30"X48"

PPPPPPPPPPPPPPPPPPPPPPPPMATCHLINE BMATCHLINE B

MATCHLINE CMATCHLINE C
OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 4AND 5PROPOSEDBORE PIT 4EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)PROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201827 LOCATION 6CPAU POLE 6773REMOVE1 - 50' WOOD POLE1 - 8' CROSSARMS2 - BELLS1 - GUY ANCHORSCPAU CABLE REMOVALBETWEEN LOCATION 5 & 6~700' - 3-1/0 AL WIRE FROM POLE 6772 TOPOLE 6773BETWEEN LOCATION 6 & 7~350' - 3-1/0 AL WIRE FROM POLE 6773 TOPOLE 6774 6 45'6774
45'6775
F

PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP

PB404033'X5'
600'
FIBER BOX30"X48"

MATCHLINE CMATCHLINE C

MATCHLINE DMATCHLINE D
PROPOSEDBORE PIT 5OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 4AND 5EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-201927 LOCATION 7CPAU POLE 6774REMOVE1 - 45' WOOD POLE1 - 8' CROSSARMS2 - BELLSLOCATION 8CPAU POLE 6775REMOVE1 - 45' WOOD POLE2 - 8' CROSSARMS4 - BELLS1 - GUY ANCHORS CPAU CABLE REMOVALBETWEEN LOCATION 6 & 7~350' - 3-1/0 AL WIRE FROM POLE 6773 TOPOLE 6774BETWEEN LOCATION 7 & 8~500' - 3-1/0 AL WIRE FROM POLE 6774 TOPOLE 6775BETWEEN LOCATION 8 & 9~520' - 3-1/0 AL WIRE FROM POLE 6775 TOPOLE 67767 8 MONTE BELLO ROAD
45'6776

PPPPPPPPPPPPPPPPPPPPPP

F
PPPPPPPPPPPPPPPPPPB404023'X5'
600'
600'FIBER BOX30"X48"
MATCHLINE DMATCHLINE DMATCHLINE EMATCHLINE EPROPOSEDBORE PIT 6EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIREDPROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-202027 LOCATION 9CPAU POLE 6776REMOVE1 - 45' WOOD POLE1 - 8' CROSSARMS2 - BELLSCPAU CABLE REMOVALBETWEEN LOCATION 8 & 9~520' - 3-1/0 AL WIRE FROM POLE 6775 TOPOLE 6776BETWEEN LOCATION 9 & 10~440' - 3-1/0 AL WIRE FROM POLE 6776 TOPOLE 6777 9 MONTE BELLO ROAD40'6777
45'6778
45'6779
F
F
PPPPP

PPPPPPP
PB404003'X5'
PB404013'X5'
FIBER BOX30"X48"
FIBER BOX30"X48"

PPPPPPPPPPPPPPPPPPPPPPPPPPP
600'

MATCHLINE EMATCHLINE E
MATCHLINE FMATCHLINE FPROPOSEDBORE PIT 8
PROPOSEDBORE PIT 7TEMPORARYSTAGINGAREA 2

PROPOSED
OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 8AND 9EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-202127 LOCATION 10CPAU POLE 6777REMOVE1 - 40' WOOD POLE1 - 8' CROSSARMS2 - BELLSLOCATION 11CPAU POLE 6778REMOVE1 - 45' WOOD POLE2 - 8' CROSSARMS4 - BELLS1 - GUY ANCHORSLOCATION 12CPAU POLE 6779REMOVE1 - 45' WOOD POLE2 - 8' CROSSARMS4 - BELLS2 - GUY ANCHORS CPAU CABLE REMOVALBETWEEN LOCATION 9 & 10~440' - 3-1/0 AL WIRE FROM POLE 6776 TOPOLE 6777BETWEEN LOCATION 10 & 11~410' - 3-1/0 AL WIRE FROM POLE 6777 TOPOLE 6778BETWEEN LOCATION 11 & 12~260' - 3-1/0 AL WIRE FROM POLE 6778 TOPOLE 6779BETWEEN LOCATION 12 & 13~350' - 3-1/0 AL WIRE FROM POLE 6779 TOPOLE 6780 10 11
12 45'6779
40'6781
45'6780
F

PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP

PB403993'X5'
600'
FIBER BOX30"X48"
FIBER BOX30"X48"MATCHLINE FMATCHLINE F
MATCHLINE GPROPOSEDBORE PIT 9
OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 8AND 9
OPEN TRENCHREQUIREDBETWEENPROPOSEDBORE PIT 8AND 9
PROPOSEDBORE PIT 8
EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIRED PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-202227 LOCATION 13CPAU POLE 6780REMOVE1- 45' WOOD POLE2 - 8' CROSSARMS4 - D.E. INSULATORS4 - BELLS3 - GUY ANCHORSLOCATION 14CPAU POLE 6781REMOVE1 - 40' WOOD POLE4 - BELLS4 - 8' CROSSARMS4 - D.E. INSULATORS3 - GUY ANCHORS CPAU CABLE REMOVALBETWEEN LOCATION 12 & 13~350' - 3-1/0 AL WIRE FROM POLE 6779 TOPOLE 6780BETWEEN LOCATION 13 & 14~185' - 3-1/0 AL WIRE FROM POLE 6780 TOPOLE 6781BETWEEN LOCATION 14 & 15~230' - 3-1/0 AL WIRE FROM POLE 6781 TOPOLE 678412 13 14
45'6780
45'678445'6785
40'678730'678950'6788
45'6791
F

PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP

TX PAD54"X60"
PB403993'X5'
LB30060LB VAULT - 3'X5'LB PAD - 4'X6'95'575'600'
FIBER BOX30"X48"
2 - 3.63"P
F
PPPPPFIBER BOX30"X48"SECONDARYBOX24"X36"3RD PARTYSERVICE POLEMATCHLINE GMATCHLINE G SSS40'20'POLE 6789 AND 3RDPARTY SERVICEPOLE INTENDING TOREMAIN. WILL BEOWNED BY 3RDPARTY PROPOSEDBORE PIT 10
EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EASEMENTEXTENSION FORPROPOSEDEQUIPMENT 20'X40'EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIRED EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-202327 LOCATION 15CPAU POLE 6784REMOVE1 - 45' WOOD POLE4 - BELLS2 - 8' CROSSARMS4 - D.E. INSULATORS2 - GUY ANCHORSLOCATION 16CPAU POLE 6785REMOVE1 - 45' WOOD POLE4 - BELLS2 - 8' CROSSARMS4 - D.E. INSULATORS1 - GUY ANCHORSLOCATION 17CPAU POLE 6787REMOVE1 - TOP 40' WOOD POLE1 - 10 KVA PT TX 64672 - 8' CROSSARMS2 - D.E. INSULATORS4 - BELLS2 - CUTOUTS2 - FUSESLOCATION 18CPAU POLE 6789REMOVE1 - RISERTOP WOOD POLE. POLE TO BERELINQUISHED TO AT&TLOCATION 19THIRD PARTY OWNED SERVICE POLENO WORK PROPOSED TO THIS POLE AS IT ISOWNED BY THIRD PARTYLOCATION 20CPAU POLE 6788REMOVE1 - 50' WOOD POLE4 - 8' CROSSARMS2 - D.E. INSULATORS5 - BELLS2 - GUY ANCHORSLOCATION 21CPAU POLE 6791REMOVE1 - 45' WOOD POLE4 - 8' CROSSARMS4 - BELLS2 - GUY ANCHORS CPAU CABLE REMOVALBETWEEN LOCATION 14 & 15~230' - 3-1/0 AL WIRE FROM POLE 6781 TOPOLE 6784BETWEEN LOCATION 15 & 16~230' - 3-1/0 AL WIRE FROM POLE 6784 TOPOLE 6785BETWEEN LOCATION 16 & 17~260' - 3-1/0 AL WIRE FROM POLE 6785 TOPOLE 6787BETWEEN LOCATION 17 & 18~100' - 1-1/0 AL TRIPLEX WIRE FROM POLE6787 TO POLE 6789BETWEEN LOCATION 17 & 20~80' - 3-1/0 AL WIRE FROM POLE 6787 TOPOLE 6788BETWEEN LOCATION 20 & 21~280' - 3-1/0 AL WIRE FROM POLE 6788 TOPOLE 679113 14 15 16
171819
20 21
45'6794 40'6796
POLESERVICE35'6793
45'6791
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECT PHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-202427 LOCATION 22CPAU POLE 6794REMOVE1 - TOP 45' WOOD POLE1 - 15 KVA PT TX 45034 - 8' CROSSARMS6 - BELLS2 - GUY ANCHORS3 - D.E. INSULATORS2 - CUTOUTS2 - FUSESLOCATION 23CPAU POLE 6793REMOVE1 - 35' WOOD POLE1 - GUY ANCHORLOCATION 24CPAU SERVICE POLEREMOVE1 - 35' WOOD POLE1 - RISER1 - METERTHE SCOPE OF WORK TO BRING POWER TOPUMP NEAR "BACKPACK CAMP" ISREMOVED. POLE LINE TO BE ENTIRELYREMOVED TO THAT PUMP. DISCONNECTMETER AND PEDS.LOCATION 25CPAU POLE 6796REMOVE1 - 40' WOOD POLE1 - 8' CROSSARMS2 - BELLS CPAU CABLE REMOVALBETWEEN LOCATION 21 & 22~200' - 3-1/0 AL WIRE FROM POLE 6791 TOPOLE 6794BETWEEN LOCATION 22 & 23~150' - 1-1/0 AL TRIPLEX WIRE FROM POLE6794 TO POLE 6793BETWEEN LOCATION 23 & 24~120' - 1-1/0 AL TRIPLEX WIRE FROM POLE6793 TO SERVICE POLEBETWEEN LOCATION 22 & 25~430' - 3-1/0 AL WIRE FROM POLE 6794 TOPOLE 6796BETWEEN LOCATION 25 & 26~815' - 3-1/0 AL WIRE FROM POLE 6796 TOPOLE 679721 2223
24 25
45'6797
F

PPPPPPPPP
1719172117231725MONTE BELLO ROAD679845'40'6799

PPPPPPPPPPPPPPPPPPPPPPPPPPPP
40'6800
F
TX PAD54"X60"LB30059LB VAULT - 3'X5'LB PAD - 4'X6'
125'
FIBER BOX30"X48"5'

PPPPPPPPPPPPPP

375'SSSSSS
SSSSSS
125'
PB403943'X5'FIBER BOX30"X48"
5' 5'

MATCHLINE IMATCHLINE IMATCHLINE JMATCHLINE J
40'20'
10' WIDEEASEMENT
EASEMENT EXTENSIONFOR PROPOSEDEQUIPMENT 20'X40'
POLE 6799 AND 6800POLE INTENDING TOREMAIN. CO-OWNEDBY CPAU AND AT&T,EXISTING ELECTRICSERVICE DROPS TOBUILDINGS ON SITEPROPOSEDBORE PIT 16PROPOSEDBORE PIT 15 PROPOSEDBORE PIT 14
TEMPORARYSTAGINGAREA 4
EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)

EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIRED
PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECT PHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-202527 LOCATION 26CPAU POLE 6797REMOVE1 - 45' WOOD POLE2 - BELLS1 - 8' CROSSARMS1 - GUY ANCHORLOCATION 27CPAU POLE 6798REMOVE1- 45' WOOD POLE2 - 8' CROSSARMS4 - CUTOUTS2 - FUSES2 - BELLS8 - D.E. INSULATORS2 - GUY ANCHORLOCATION 28CPAU POLE 6799REMOVE3 - 8' CROSSARMS4 - BELLS5 - D.E. INSULATORS2 - GUY ANCHORTOP WOOD POLE, LEAVE SECONDARYSERVICE DROP TO STRUCTURES. POLEWILL BE INCLUDED IN EASEMENT TRANSFERUNTIL ALL SERVICES ATTACHED TO POLEARE UNDERGROUNDED.LOCATION 29CPAU POLE 6800REMOVE1 - 8' CROSSARMS2 - BELLS2 - D.E. INSULATORS2 - GUY ANCHOR1 - 37.5 KVA PT TX 78052 - CUTOUTS2 - FUSESTOP WOOD POLE, LEAVE SECONDARYSERVICE DROP TO STRUCTURES. POLEWILL BE INCLUDED IN EASEMENT TRANSFERUNTIL ALL SERVICES ATTACHED TO POLEARE UNDERGROUNDED.

CPAU CABLE REMOVALBETWEEN LOCATION 25 & 26~815' - 3-1/0 AL WIRE FROM POLE 6796 TOPOLE 6797BETWEEN LOCATION 26 & 27~400' - 3-1/0 AL WIRE FROM POLE 6797 TOPOLE 6798BETWEEN LOCATION 27 & 28~150' - 3-1/0 AL WIRE FROM POLE 6798 TOPOLE 6799BETWEEN LOCATION 28 & 29~180' - 3-1/0 AL WIRE FROM POLE 6799 TOPOLE 6800BETWEEN LOCATION 28 & 30~290' - 3-1/0 AL WIRE FROM POLE 6799 TOPOLE 6801 26 27 28
29 17271729
35'680135'6802
35'6803
35'6804PPPPPPPPPPPP
F
PB403923'X5'
600'
600'
FIBER BOX30"X48"

PPPPPPPPPPPPPPPPPPPPPPPPPPPP
FPB404083'X5'FIBER BOX30"X48"
PPPPP

MATCHLINE J

MATCHLINE KMATCHLINE K
POLE 6799 AND 6800POLE INTENDING TO
PROPOSEDBORE PIT 18
PROPOSEDBORE PIT 17
EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.)EXCLUSION MEASUREAT TRAIL JUNCTIONSREQUIREDPROPOSED EASEMENT6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-202627 LOCATION 30CPAU POLE 6801REMOVE1- 35' WOOD POLE2 - 8' CROSSARMS4 - BELLS1 - GUY ANCHORLOCATION 31CPAU POLE 6802REMOVE1- 35' WOOD POLE1 - 8' CROSSARMS2 - BELLS1 - GUY ANCHORLOCATION 32CPAU POLE 6803REMOVE1- 35' WOOD POLE1 - 8' CROSSARMS2 - BELLS1 - GUY ANCHORLOCATION 33CPAU POLE 6804REMOVE1- 35' WOOD POLE1 - 8' CROSSARMS2 - BELLS4 - D.E. INSULATORS1 - GUY ANCHOR CPAU CABLE REMOVALBETWEEN LOCATION 28 & 30~290' - 3-1/0 AL WIRE FROM POLE 6799 TOPOLE 6801BETWEEN LOCATION 30 & 31~225' - 3-1/0 AL WIRE FROM POLE 6801 TOPOLE 6802BETWEEN LOCATION 31 & 32~250' - 3-1/0 AL WIRE FROM POLE 6802 TOPOLE 6803BETWEEN LOCATION 32 & 33~300' - 3-1/0 AL WIRE FROM POLE 6803 TOPOLE 6804BETWEEN LOCATION 33 & 34~270' - 3-1/0 AL WIRE FROM POLE 6804 TOPOLE 6805 30 31
32 33
1741 175733-#2 STR CU
40'680540'6806PPPPPPPPPPPPPPPPP

SSSSSSSF
PB403913'X5'SECONDARYBOX24"X36"150'FIBER BOX30"X48"SSSSSSSTX PAD54"X60" 7'P
5'
15'P
MATCHLINE KMATCHLINE K20'20'EASEMENT EXTENSIONFOR PROPOSEDEQUIPMENT 20'X20' POLE 6805 AND 6806POLE INTENDING TOREMAIN. OWNED BYCPAU, EXISTINGELECTRIC SERVICEDROPS TOBUILDINGS ON SITE150'PROPOSEDBORE PIT 19PROPOSEDBORE PIT 20SECONDARYBOX24"X36"EASEMENT EXTENSIONTO ENCOMPASSELECTRIC AND FIBERVAULTS 9' WIDE (TYP.) EASEMENT EXTENSIONFOR PROPOSEDEQUIPMENT 20'X20'
EASEMENT EXTENSIONFOR PROPOSEDEQUIPMENT 20'X20'
PROPOSED EASEMENT6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERINGCity of Palo AltoAPPROVEDSR. ENGINEER / MANAGERENGR.CHKD.DRWN CKT #MAP #SCALEDATEAPPR.

SHEETW.O.# / DRAWING #OF
DESCRIPTIONCalifornia40027598FOOTHILL FIRE MITIGATION PROJECTPHASE 4REMOVALB. GROSSMANP.VALATHP.VALATHB. GROSSMANNTS----HV-202727 34 35
LOCATION 34CPAU POLE 6805REMOVE1 - 8' CROSSARMS2 - BELLS1 - GUY ANCHOR1 - 25 KVA PT TX 77472 - CUTOUTS2 - FUSESTOP WOOD POLE, LEAVE SECONDARYSERVICE DROP TO STRUCTURES. POLEWILL BE INCLUDED IN EASEMENT TRANSFERUNTIL ALL SERVICES ATTACHED TO POLEARE UNDERGROUNDED.LOCATION 35CPAU POLE 6806REMOVE2 - 8' CROSSARMS2 - BELLS2 - GUY ANCHORS2 - D.E. INSULATORS1 - 25 KVA PT TX 75992 - CUTOUTS2 - FUSESTOP WOOD POLE, LEAVE SECONDARYSERVICE DROP TO STRUCTURES. POLEWILL BE INCLUDED IN EASEMENT TRANSFERUNTIL ALL SERVICES ATTACHED TO POLEARE UNDERGROUNDED.

CPAU CABLE REMOVALBETWEEN LOCATION 33 & 34~270' - 3-1/0 AL WIRE FROM POLE 6804 TOPOLE 6805BETWEEN LOCATION 34 & 35~310' - 3-1/0 AL WIRE FROM POLE 6805 TOPOLE 6806

Best Management Practices for On-Site Handling of Spoils:

1. Designated Storage Areas:
o Establish clearly marked, stable areas for spoil storage that are located away from sensitive environments like water bodies, wetlands, or steep slopes. o Use temporary barriers, such as silt fences, wattles, or berms, to prevent spoil migration due to rain or wind.
o Regularly inspect storage areas for runoff issues and address them promptly with drainage systems or sediment traps.

2. Segregation of Spoils:
o Separate spoils by type (e.g., soil, rock, demolition debris) for efficient reuse or recycling later.
o Keep contaminated or hazardous materials isolated from clean spoils to prevent cross-contamination.
o Hazardous Materials (as defined by the EPA) shall be stored with a method for secondary containment in the event of a leak or spill. Secondary containment may take the form of a larger container that can sufficiently hold the contents of a spill.

3. Accessibility and Safety:
o Ensure spoil storage areas are accessible for easy loading and unloading while maintaining a safe distance from active construction zones. o Provide workers with personal protective equipment (PPE) and training on safe spoil handling techniques.

4. Disposal of Spoils:
o Larger spoils (such as cut conduit or broken boring rods) may be temporarily stored in designated areas identified by the AHJ. These spoils should be removed from these temporary areas at the end of every working week (typically Friday unless there is a holiday than the day before).

Best Management Practices (BMP) Procedure for Underground Electric Distribution Projects
Techniques Used: Horizontal Directional Drilling (HDD) & Open Trenching

1. Horizontal Directional Drilling (HDD) Best Practices • Drilling Path Design & Bore Planning
o Utilize GPS tracking and hydraulic calculations to plan bore paths and ensure accurate drill trajectories.
o Avoid congested utility corridors and environmentally sensitive areas. • Drill Fluid Management & Environmental Controls
o Implement fluid containment measures, such vacuum recovery systems (Vac-Truck).
• Pullback & Conduit Installation
o Conduct pre-pullback inspections to ensure the borehole is properly conditioned for conduit installation.
o Use HDPE or reinforced PVC conduit rated for underground electrical distribution.
• Post-Drill Verification & Testing
o Perform integrity testing on installed conduits (Mandrel-test).

2. Open Trenching Best Practices
• Excavation & Utility Coordination
o Use soft digging techniques (hydro excavation or vacuum excavation) to expose existing utilities safely.
o Employ trench shoring methods, such as trench boxes or sloping, to prevent collapses.

• Cable Placement & Bedding Material
o Ensure cables are placed at the correct depth per utility standards (typically 30 inches minimum below grade).
o Utilize clean sand or crushed stone as bedding material to protect conduit and cables.
• Backfilling & Surface Restoration
o Use controlled compaction methods to prevent future settlement and ground disturbances.
o Restore pavement, landscaping, or sidewalks to their original condition, ensuring compliance with municipal standards.

3. Weather, Environmental & Sustainability Considerations • Erosion & Sediment Control
o Use silt fences and sediment traps to prevent runo3 from trenching areas. • Drilling Waste Management
o Dispose of excess drilling fluids responsibly and avoid contamination of stormwater systems.
• Wildlife Protections
o Maintain bu3er zones around protected environmental areas. o Utilize construction tree wrap on any trees in proximity to the trench. • Weather Consideration
o In the event of heavy rain or other weather that would make construction infeasible, crews to make best e3ort to prepare the worksite for the weather and pause construction until safe to resume work.
o In the event of a red flag warning in the Foothills area, all construction to cease and resume once the warning has lifted. Activities such as plating open trenches, cleaning up trash, or other “housekeeping” are permitted.

4. Post-Construction & Quality Assurance
• Documentation & Reporting
o Submit as-built drawings and project completion reports for regulatory compliance.
o Maintain detailed records of cable installations, drill logs, and trenching activities.

Discovery of Human Remains or Burial Items:

The following actions must be taken immediately upon the discovery of human remains:
• Stop immediately and contact the County Coroner.
• The coroner has two working days to examine human remains after being notified by the responsible person. If the remains are Native American, the Coroner has 24 hours to notify the Native American Heritage Commission. • The Native American Heritage Commission will immediately notify the person it believes to be the most likely descendent of the deceased Native American. • The most likely descendent has 48 hours to make recommendations to the owner, or representative, for the treatment or disposition, with proper dignity, of the human remains and grave goods.

If the descendent does not make recommendations within 48 hours the owner shall reinter the remains in an area of the property secure from further disturbance, or:
• If the landowner does not accept the descendant’s recommendations, the owner or the descendent may request mediation by the Native American Heritage Commission.
• Discuss and confer means the meaningful and timely discussion with careful consideration of the views of each party’s cultural values and, where feasible, seeking agreement.
• If mediation fails, the landowner shall reinter the human remains with appropriate dignity on the property in a location not subject to future subsurface disturbance.

Primary Electric Vault Spec
Alhambra A-1252 Cover,
see following sheet
3x5 Vault Lid:
3x5 Loadbreak Lid:

Vault Examples
70"
6"
12"
12"
12"
12"
37"
46"
94"
113"
70"
12"
12"
12"
46"
94"
55"
12"
12"
55"
12"
12"
37"
12"
3"
79"
176"
113"
43"
NTS
NTS
LoadBreak and Transformer
Equipment Examples
Temporary Staging Area
Layout
30'
50'
Temporary staging area to serve
as a location to park the bore rig
and vacuum trailer, store conduit
reels, store spoils, and stage a
port-a-potty. Likely area to be
30'x50', this may be variable
depending on current equipment in
use.

Cones to be placed
on boundaries of
staging area with
caution tape wrapped
at the tops
Biodegradable
Wattles typ.

Port-a Potty
with wattles
for secondary
containment.

Location may
vary.

Any food waste to be
stored in trash bags
and taken off-site for
disposal.

Any earthen material
to require secondary
containment.

STANDARD

INSTALLATION TYPES
Existing Conduit
Plow
Directional Bore

STANDARD COLORS

FEATURES

SMOOTHWALL
• Manufactured from flexible HDPE, makes gradual bends without special equipment
• Continuous lengths reduce joining costs
• Excellent low temperature properties, allows installation in cold climates
• Outstanding long term cable protection from shifting ground, rock and root impingement
• Provides a permanent pathway, simpifies future cable repairs or replacement
UV
UV

SIZE RANGE AVAILABLE

0.5"

0.75"

1.0"

1.25"

1.5"

2.0"

2.5"

3.0"

4.0"

5.0"

6.0"

8.0"

10.0"

12.0"

WALL TYPES
SDR-9
SDR-11
SDR-13.5
SDR-15.5
SDR-17
SCH-40
SCH-80
SIDR-9
SIDR-11

STANDARD
FOOTAGE MARKINGS Sequential foot or meter markings. Custom print streams available.

SPECIFICATIONS All Smoothwall conduit dimensions meets or exceeds one or more of the following:

ASTM F-2160, ASTM D-3350, ASTM D-2239, ASTM D-3485, NEMA TC-7, UL 651, UL 1990, Bellcore GR-356.

OPTIONS
SILICORE is co-extruded with the tough HDPE jacket creating a super, slick permanent lining. SILICORE lined ducts allow for higher speed cable jetting and longer cable pulls.

PREINSTALLED TAPE Factory pre-installed Bull-Line™ Pull Tape with EVEN-LOAD™, ensures extra slack at any access point throughout the reel. Available 500lb–6,000lb tensile strength or locatable.

UL LISTING AVAILABLE from ½"–6" for SDR 13.5, SCH 40 and SCH 80.

EXTERNAL STRIPES can be added from our standard color offering to facilitate visual identification.

UV PROTECTANT available for aerial/lashed placement.
+1 800 847 7661
WWW.DURALINE.COM
UV
UV
DL.SMOOTHWALL.9.2020

WALL TYPE
PIPE SIZE ½" ¾" 1" 1¼" 1½" 2" 2 ½"
NOM OD (IN) 0.840 1.050 1.315 1.660 1.900 2.375 2.875
OD TOLERENCE +/– 0.004 0.005 0.007 0.008 0.010 0.012 0.014 BEND RADIUS (IN) SUPPORTED 8 10 13 17 19 24 29
BEND RADIUS (IN) UNSUPPORTED 16 20 26 34 38 48 58
SDR-9
MIN. WALL (IN) 0.093 0.117 0.146 0.184 0.211 0.264 0.319 WALL TOLERANCE + 0.020 0.020 0.020 0.022 0.025 0.032 0.038 AVG ID (IN) 0.634 0.796 1.003 1.270 1.453 1.815 2.199
MIN ID (IN) 0.614 0.776 0.983 1.248 1.428 1.783 2.161
WEIGHT (#/FT) 0.098 0.152 0.234 0.370 0.485 0.759 1.110 SWPS (LBS) 525 821 1,288 ,052 2,688 4,200 6,155
SDR-11
MIN. WALL (IN) 0.076 0.095 0.120 0.151 0.173 0.216 0.261 WALL TOLERANCE + 0.020 0.020 0.020 0.020 0.021 0.026 0.031 AVG ID (IN) 0.668 0.840 1.055 1.338 1.533 1.917 2.322
MIN ID (IN) 0.648 0.820 1.035 1.318 1.512 1.891 2.291
WEIGHT (#/FT) 0.084 0.128 0.199 0.312 0.408 0.636 0.930 SWPS (LBS) 440 687 1078 1717 2249 3515 5151
SDR-13.5
MIN. WALL (IN) 0.062 0.078 0.097 0.123 0.141 0.176 0.213 WALL TOLERANCE + 0.020 0.020 0.020 0.020 0.020 0.021 0.026 AVG ID (IN) 0.696 0.874 1.101 1.394 1.598 2.002 2.423
MIN ID (IN) 0.676 0.854 1.081 1.374 1.578 1.981 2.397
WEIGHT (#/FT) 0.072 0.110 0.167 0.263 0.342 0.528 0.775 SWPS (LBS) 365 570 894 1425 1867 2917 4274
SDR-15.5
MIN. WALL (IN) 0.062 0.068 0.084 0.107 0.123 0.153 0.185 WALL TOLERANCE + 0.018 0.020 0.020 0.020 0.020 0.020 0.022 AVG ID (IN) 0.698 0.894 1.127 1.426 1.634 2.049 2.483
MIN ID (IN) 0.680 0.874 1.107 1.406 1.614 2.029 2.461
WEIGHT (#/FT) 0.071 0.098 0.149 0.234 0.304 0.467 0.680 SWPS (LBS) 792 1,234 1,607 2,466 3,592
SDR-17
MIN. WALL (IN) 0.062 0.077 0.098 0.112 0.140 0.169
WALL TOLERANCE + 0.020 0.020 0.020 0.020 0.020 0.020
AVG ID (IN) 0.906 1.141 1.444 1.656 2.075 2.517
MIN ID (IN) 0.886 1.121 1.424 1.636 2.055 2.497
WEIGHT (#/FT) 0.091 0.138 0.217 0.281 0.432 0.625
SWPS (LBS) 460 722 1150 1507 2355 3450
SMOOTHWALL (SDR) TECHNICAL SPECIFICATIONS (SIZES 3"-12" NEXT PAGE) (SIZES 3"-12: NEXT PAGE)
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV

WALL TYPE
PIPE SIZE 3" 4" 5" 6" 8" 10" 12"
NOM OD (IN) 3.500 4.500 5.563 6.625 8.625 10.750 12.750 OD TOLERENCE +/– 0.018 0.023 0.028 0.033 0.043 0.054 0.064 BEND RADIUS (IN) SUPPORTED 39 50 61 73 155 194 230
BEND RADIUS (IN) UNSUPPORTED 78 100 122 146 233 290 344 SDR-9
MIN. WALL (IN) 0.389 0.500 0.618 0.736 0.958 1.194 1.417 WALL TOLERANCE + 0.047 0.060 0.074 0.088 0.115 0.143 0.170 AVG ID (IN) 2.675 3.440 4.253 5.065 6.593 8.219 9.746
MIN ID (IN) 2.628 3.380 4.179 4.977 6.479 8.076 9.576
WEIGHT (#/FT) 1.648 2.723 4.161 5.901 10.001 15.534 21.866 SWPS (LBS) 9,122 15,080 23,045 32,684 55,397 8,6057 121,056 SDR-11
MIN. WALL (IN) 0.318 0.409 0.506 0.602 0.784 0.977 1.159 WALL TOLERANCE + 0.038 0.049 0.061 0.072 0.094 0.117 0.139 AVG ID (IN) 2.826 3.633 4.490 5.349 6.963 8.679 10.293
MIN ID (IN) 2.788 3.584 4.429 5.277 6.869 8.562 10.154
WEIGHT (#/FT) 1.380 2.282 3.490 4.944 8.383 13.019 18.319 SWPS (LBS) 7633 12618 19284 27349 46355 72010 101297
SDR-13.5
MIN. WALL (IN) 0.259 0.333 0.412 0.491 0.639 0.796 0.944 WALL TOLERANCE + 0.031 0.040 0.049 0.059 0.077 0.096 0.113 AVG ID (IN) 2.951 3.794 4.690 5.584 7.270 9.062 10.749
MIN ID (IN) 2.920 3.754 4.641 5.525 7.193 8.966 10.636
WEIGHT (#/FT) 1.146 1.895 2.896 4.112 6.969 10.821 15.214 SWPS (LBS) 6335 10472 16004 22697 38470 59762 84067
SDR-15.5
MIN. WALL (IN) 0.226 0.290 0.359 0.427
WALL TOLERANCE + 0.027 0.035 0.043 0.051
AVG ID (IN) 3.021 3.885 4.802 5.720
MIN ID (IN) 2.994 3.850 4.759 5.669
WEIGHT (#/FT) 1.011 1.669 2.552 3.615
SWPS (LBS) 5,342 8,814 13,483 19,123
SDR-17
MIN. WALL (IN) 0.206 0.265 0.327 0.390
WALL TOLERANCE + 0.025 0.032 0.039 0.047
AVG ID (IN) 3.063 3.938 4.870 5.798
MIN ID (IN) 3.038 3.906 4.831 5.751
WEIGHT (#/FT) 0.928 1.534 2.339 3.324
SWPS (LBS) 5114 8453 12918 18321
SMOOTHWALL (SDR) TECHNICAL SPECIFICATIONS (SIZES ½"-2½" PREVIOUS PAGE) (SIZES ½"-2½" PREVIOUS PAGE)
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV

WALL TYPE
PIPE SIZE ½" ¾" 1" 1¼" 1½" 2" 2 ½"
NOM OD (IN) 0.840 1.050 1.315 1.660 1.900 2.375 2.875
OD TOLERENCE +/– 0.004 0.005 0.007 0.008 0.010 0.012 0.014 BEND RADIUS (IN) SUPPORTED 8 10 13 17 19 24 29
BEND RADIUS (IN) UNSUPPORTED 16 20 26 34 38 48 58
SCH-40
MIN. WALL (IN) 0.109 0.113 0.133 0.140 0.145 0.154 0.203 WALL TOLERANCE + 0.020 0.020 0.020 0.020 0.020 0.020 0.024 MIN ID (IN) 0.582 0.784 1.009 1.340 1.570 2.027 2.421
AVG ID (IN) 0.602 0.804 1.029 1.360 1.590 2.047 2.445
WEIGHT (#/FT) 0.111 0.148 0.217 0.293 0.350 0.469 0.740 SWPS (LBS) 601 798 1340 1604 1919 2579 4090
SCH-80
MIN. WALL (IN) 0.147 0.154 0.179 0.191 0.200 0.218 0.276 WALL TOLERANCE + 0.020 0.020 0.021 0.023 0.024 0.026 0.033 MIN ID (IN) 0.506 0.702 0.915 1.232 1.452 1.887 2.257
AVG ID (IN) 0.526 0.722 0.936 1.255 1.476 1.913 2.290
WEIGHT (#/FT) 0.139 0.188 0.276 0.382 0.463 0.641 0.978 SWPS (LBS) 768 1040 1533 2116 2564 2545 5409

SMOOTHWALL SDR & SCHEDULE NOTES

1. Bend Radius
½" through 2 ½" Supported Bend Radius 10 times the OD Unsupported Bend Radius 20 times the OD 3" through 6" Supported Bend Radius 11 times the OD Unsupported Bend Radius 22 times the OD 8" through 16" Supported Bend Radius 18 times the OD Unsupported Bend Radius 27 times the OD

2. During cable placement, large sweeping bends are recommended over tighter bends.

Pre-formed sweeps are recommended for conduit sizes 8" through 16" diameters.

3. SWPS (Safe Working Pull Strength) is calculated using a 25% safety factor with the minimum resin tensile strength of 3,000 psi, the average OD and average wall thickness.

SMOOTHWALL (SCH) TECHNICAL SPECIFICATIONS (SIZES 3"-12" NEXT PAGE) (SIZES 3"-12: NEXT PAGE)
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV

WALL TYPE
PIPE SIZE 3" 4" 5" 6" 8" 10" 12"
NOM OD (IN) 3.500 4.500 5.563 6.625 8.625 10.750 12.750 OD TOLERENCE +/– 0.018 0.023 0.028 0.033 0.043 0.054 0.064 BEND RADIUS (IN) SUPPORTED 39 50 61 73 155 194 230
BEND RADIUS (IN) UNSUPPORTED 78 100 122 146 233 290 344 SCH-40
MIN. WALL (IN) 0.216 0.237 0.258 0.280 0.322 0.365 0.406 WALL TOLERANCE + 0.026 0.028 0.031 0.034 0.039 0.044 0.049 MIN ID (IN) 3.016 3.970 4.985 5.997 7.903 9.932 11.840
AVG ID (IN) 3.042 3.998 5.016 6.031 7.942 9.976 11.889
WEIGHT (#/FT) 0.969 1.380 1.872 2.432 3.661 5.215 6.846 SWPS (LBS) 5348 7618 10320 13395 20158 28580
SCH-80
MIN. WALL (IN) 0.300 0.337 0.375 0.432
WALL TOLERANCE + 0.036 0.040 0.045 0.052
MIN ID (IN) 2.828 3.746 4.723 5.657
AVG ID (IN) 2.864 3.786 4.768 5.709
WEIGHT (#/FT) 1.310 1.914 2.657 3.656
SWPS (LBS) 7238 10578 14669 20172
SMOOTHWALL (SCH) TECHNICAL SPECIFICATIONS (SIZES ½"-2½" PREVIOUS PAGE) (SIZES ½"-2½" PREVIOUS PAGE)
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV

WALL TYPE
PIPE SIZE ½" ¾" 1" 1 ¼" 1 ½" 2" 2 ½" 3" 4" 6"
MIN ID (IN) 0.622 0.824 1.049 1.380 1.610 2.067 2.469 3.068 4.026 6.065 ID TOLERENCE + 0.010 0.010 0.010 0.010 0.015 0.015 0.015 0.015 0.020 0.020 ID TOLERENCE – 0.010 0.015 0.020 0.020 0.020 0.020 0.020 0.030 0.020 0.035

BEND RADIUS (IN)
SUPPORTED 8 10 13 17 19 24 29 39 50 73

BEND RADIUS (IN)
UNSUPPORTED 16 20 26 34 38 48 58 78 100 146
SIDR-9
MIN. WALL (IN) 0.069 0.092 0.117 0.153 0.230
WALL TOLERANCE + 0.020 0.020 0.020 0.020 0.028
AVG OD (IN) 0.780 1.026 1.298 1.701 2.553
WEIGHT (#/FT) 0.072 0.122 0.192 0.324 0.729
SWPS (LBS) 445 760 1471 1652 4535
SIDR-11.5
MIN. WALL (IN) 0.060 0.072 0.091 0.120 0.140 0.180 0.215 0.267 0.350 0.527 WALL TOLERANCE + 0.020 0.020 0.020 0.020 0.020 0.022 0.026 0.032 0.042 0.063 AVG OD (IN) 0.762 0.986 1.246 1.635 1.908 2.447 2.919 3.627 4.768 7.175 WEIGHT (#/FT) 0.063 0.096 0.150 0.253 0.341 0.558 0.792 1.225 2.111 4.782 SWPS (LBS) 390 597 891 1,549 2,123 3,468 4,934 7,627 13,119 29,750 SMOOTHWALL SIDR NOTES:

1. Bend Radius ½” through 2 ½”
Supported Bend Radius 10 times the OD Unsupported Bend Radius 20 times the OD 3” through 6” Supported Bend Radius 11 times the OD Unsupported Bend Radius 22 times the OD 8” through 16” Supported Bend Radius 18 times the OD Unsupported Bend Radius 27 times the OD

2. During cable placement, large sweeping bends are recommended over tighter bends.

Pre-formed sweeps are recommended for conduit sizes 8” through 16” diameters.

3. SWPS (Safe Working Pull Strength) is calculated using a 25% safety factor with the minimum resin tensile strength of 3,000 psi, the average OD and average wall thickness.

4. Internal or external ribs are in addition to the average wall and for determining OD and ID dimensions.

The average rib height to be added is 0.020”

5. Add 0.016 #/ft for ribbed products 1 1/2” and less. For 2” and larger, add 0.025 #/ft

SMOOTHWALL (SIDR) TECHNICAL SPECIFICATIONS
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV
AT SNSILECEOFOFLACI UExp._____RERST
ADEDLMOD.CNOINARRYEVL.S. 6766KRISTINAER

← All documents from this meeting