Automated Weather Observation System (AWOS) Project IFB 194026 IFB Post Date: 3/10/2025
IFB Due Date: 4/21/2025
UNIT PRICE TOTAL ITEM PRICE UNIT PRICE TOTAL ITEM PRICE UNIT PRICE TOTAL ITEM PRICE Base Bid
100-1 MOBILIZATION/DEMOBILIZATION 1 LS 85,564.00$ 85,564.00$ 115,000.00$ 115,000.00$ 98,800.00$ 98,800.00$ 109-1 UPGRADES TO ELECTRICAL SHELTER 1 LS 35,000.00$ 35,000.00$ 117,905.00$ 117,905.00$ 56,900.00$ 56,900.00$ 111-1 1-2”C HDPE CONDUIT, HORIZONTAL DIRECTIONAL DRILLING 200 LF 150.00$ 30,000.00$ 300.00$ 60,000.00$ 98.00$ 19,600.00$ 111-2 2-4”C HDPE HORIZONTAL DIRECTIONAL DIRLL AFL DUCTBANK 1500 LF 175.00$ 262,500.00$ 101.33$ 151,995.00$ 107.00$ 160,500.00$ 115-1 1-2”C or 1-4”C PVC CONDUIT, CONCRETE ENCASED IN DIRT OR NON-PAVED EARTH 600 LF 95.00$ 57,000.00$ 115.00$ 69,000.00$ 143.00$ 85,800.00$ 116-2 24” L-867D JUNCTION CAN IN NON PAVED EARTH 4 EA 10,000.00$ 40,000.00$ 10,700.00$ 42,800.00$ 8,000.00$ 32,000.00$ 128-1 REMOVE ELECTRICAL ITEMS 1 LS 25,000.00$ 25,000.00$ 56,600.00$ 56,600.00$ 76,200.00$ 76,200.00$ 128-2 MISCELLANEOUS ELECTRICAL WORK 1 LS 25,000.00$ 25,000.00$ 125,000.00$ 125,000.00$ 231,000.00$ 231,000.00$ 131-1 FURNISH AND INSTALL NEW SWITCHBOARD NEMA 3R 600A 1 LS 100,000.00$ 100,000.00$ 43,000.00$ 43,000.00$ 180,000.00$ 18,000.00$ 132-1 FURNISH AND INSTALL NEW 60KVA TRANSFORMER 1 LS 35,000.00$ 35,000.00$ 37,000.00$ 37,000.00$ 20,000.00$ 20,000.00$ 144-1 RUNWAY 31 PAPI POWER CABLES AND CONTROL CABLES 1 LS 60,000.00$ 60,000.00$ 205,000.00$ 205,000.00$ 29,400.00$ 29,400.00$ 144-2 RUNWAY 31 2 BOX LED PAPI REPLACEMENT, FOUNDATION AND PCU RACK 1 LS 75,000.00$ 75,000.00$ 55,000.00$ 55,000.00$ 161,000.00$ 161,000.00$ SubTotal Base Bid 830,064.00$ 1,078,300.00$ 1,151,200.00$ Alternative Bid 1A
144-3 RUNWAY 31 REIL POWER CABLES AND CONTROL CABLES 1 LS $ 60,000.00 $ 60,000.00 200,000.00$ 200,000.00$ 13,700.00$ 13,700.00$ 144-4 RUNWAY 31 LED REIL REPLACEMENT ON NEW FOUNDATION 1 LS $ 75,000.00 $ 75,000.00 35,000.00$ 35,000.00$ 66,110.00$ 66,110.00$ SubTotal Alt 1A 135,000.00$ 235,000.00$ 79,810.00$ Alternative Bid 2
102-1 RUNWAY 13/31 AWOS POWER CABLES 1800 LF $ 40.00 $ 72,000.00 140.00$ 252,000.00$ 36.00$ 64,800.00$ 102-2 RUNWAY 13/31 AWOS COMMUNICATION CABLES 2640 LF $ 30.00 $ 79,200.00 140.00$ 369,600.00$ 25.00$ 66,000.00$ 130-1 AWOS IIIPT ON NEW FOUNDATION 1 LS $ 300,000.00 $ 300,000.00 45,000.00$ 45,000.00$ 338,000.00$ 338,000.00$ Sub Total Alt 2 451,200.00$ 666,600.00$ 468,800.00$ Total 1,416,264.00$ 1,979,900.00$ 1,699,810.00$ Totals Summary
Total Bid
15% Contingency
Total Contract Amt
DESCRIPTION, WITH UNIT PRICE IN WORDS (EACH BID ITEM SHALL INCLUDE ALL
APPLICABLE TAXES, PROFIT, INSURANCE, BONDS, AND OTHER OVERHEAD)
ENGINEERS ESTIMATE
Vellutini Corporation DBA Royal
Electric Company
BID
ITEM
APPRO
X.QTY. UNIT
LOWEST BIDDER
Engineers Estimate Estate Design and Construction
Vellutini Coorporation DBA Royal
Electric Company
$ 1,416,264.00 Estate Design and Construction
% above Engineers Estimate 40% 20%
$ 1,628,704.00 1,979,900.00$
296,985.00$
2,276,885.00$
254,971.00$
1,699,810.00$
1,954,781.00$
$ 212,440.00