Cities Index.
Item 7 Staff Presentation

Palo Alto City Council
May 11, 2026

Document
Item 7 Staff Presentation
Meeting
May 11, 2026
Body
Palo Alto City Council
Original file
1.2 MB
Text extracted from the city's file for reading and search. Open the original on cityofpaloalto.primegov.com. That file is the official record.

May 11, 2026 www.paloalto.gov
3781 El Camino Real
(Builder’s Remedy)
City Council
Presenter:

Steven Switzer, Senior Planner
Zoning:
(CN) Neighborhood Commercial
(RM-30) Medium Density Multiple-
Family Residence District
Adjacent Land Uses:
• Commercial
• Residential

PROJECT LOCATION
1 PROJECT OVERVIEW
• Demo 10,100 sf of commercial space across four (4) parcels • Demo 14 residential units
• Construct multi-family residential rental project with 183 units • Seven (7) stories high (83 feet tall)
• Unit Mix:
• Studio (24 Units)
• 1 Bedroom (100 units)
• 2 Bedrooms (45 units)
• 3 Bedrooms (14 Units)
• 23 BMR units (>13% minimum), Affordable to 50-80% AMI • 215 parking spaces (183 EV) (36 Tandem)
• 144 long term bike spaces
• Lot Merger (Merging four parcels)
2 February 15, 2024 Senate Bill (SB) 330 pre-application submitted (24PLN-00048) June 10, 2024 Major ARB application submitted (24PLN-00161) September 22, 2025 Applicant requested consideration under Assembly Bill (AB) 130 (Public Resources Code Section 21080.66)
January 15, 2026 ARB (Recommended Approval 3-0)
May 11, 2026 City Council

BACKGROUND
3 • Recommended Approval (3-0) and that City Council consider the following conditions of approval:
• Add third elevator to the northeast wing of the structure. • Add door to the parking garage from the bike room.*
• Add an off-street loading space.
• Improve the parking garage screening to neighbors.*
• Recess the entrance along El Camino Real to ensure an 8 -foot clearance when doors are open.*
• Expand 3rd-floor balconies, where possible.*
• Streamline balcony materials to reduce transparency.* • Reduce the visual massing of the structure
• Provide detailed courtyard sections explaining the spa and plantings. *Items in bold were incorporated into the design.

BACKGROUND (January 15, 2026 – ARB Recommendation)
4 STATE LAW CONSTRAINTS
• “Builder’s Remedy” project as defined in Assembly Bill (AB) 1893.

• The project may not be denied based on inconsistency with the Zoning Ordinance or Comprehensive Plan land use.
• The project could be denied on finding a specific adverse impact on public health or safety that cannot be mitigated or avoided. • The City may only require compliance with objective standards that would apply to the project if it were proposed on a site that allows the density requested.
• This project, with a proposed 3.22:1 overall FAR and 152 du/ac density, would be permitted in the El Camino Real Focus Area. 5 • State Density Bonus Law allows the applicant waivers and/or concessions from applicable standards.
• AB 130 exempts infill housing projects from CEQA and sets strict timelines for City review and decision.
• (Informational Purposes only) Conformance with:
• El Camino Real Focus Area Development Standards
• Objective Design Standards
• El Camino Real Design Guidelines

STATE LAW CONSTRAINTS
6 CEQA STATUS
Exempt Pursuant to Assembly Bill (AB) 130 (Public Resources Code Section 21080.66).
• Statutory Exemption
• Permanent five (5) hearing limit on housing projects
• Sets timelines for Tribal Consultation
(60 days or 135 days)
• 30 days to approve/disapprove projects after Tribal
Consultation
7 RECOMMENDATION
Staff Recommends that City Council:

1. Consider the project exempt from California Environmental Quality Act (CEQA) in accordance with Assembly Bill (AB) 130 (Public Resources Code Section 21080.66); and

2. Approve the Major Architectural Review applications based on findings and subject to conditions of approval in the Draft Record of Land Use Action (RLUA) in Attachment B.
8 STEVEN SWITZER
Senior Planner
[email protected]
650-329-2321
9

← All documents from this meeting