P R O J E C T O V E R V I E W
9 Single -Family
Residences
7 Junior ADUs
(JADUs)
16 Total
Dwelling Units
1.02 Acres
(Vacant Site)
P R O J E C T D E T A I L S
Location: 4103 Old Trace Road, Esther Clarks Park
Low-Density Residential Project in close proximity
to excellent public schools
Self-Contained: Private Road connecting Old Trace
Rd to Arastradero Rd as well as Old Trace; no need or
reason to travel into existing neighborhood
[ SITE PLAN / LOCATION MAP ]
T H E O A K S · 4 1 0 3 O L D T R A C E R O A D , P A L O A L T O · P L A N N I N G A N D T R A N S P O R T A T I O N C O M M I S S I O N · A P R I L 2 9 , 2 0 2 6
C O M M U N I T Y
O U T R E A C H
Steel Bridge Homes Palo Alto, LP
4 1 0 3 O L D T R A C E R O A D , P A L O A L T O
2 5 P L N- 0 0 2 9 6 . 2 5 P L N- 0 0 2 9 8
• Two voluntary meetings with all interested
residents in 2025
• Invitation to review plans
• Invitation to discuss potential voluntary
upgrades on Old Trace Road after ARB hearing
(neighbors refused)
• Redesign of project after ARB to incorporate
more driveways for parking, two-car garages
for each unit
P R O J E C T O V E R V I E W
HOUSING ACCOUNTABILITY ACT & STATE DENSITY BONUS LAW PROTECTED
PROJECT
A P P R O V A L R E Q U I R E S :
Written, Objective and Verifiable Standards not speculation or worry, fear of what additional housing will do to existing home values
Limited Ability to Deny or Condition Project, e.g. Health & Safety Risks that cannot be mitigated and that are supported by written, objective and verifiable standards “Safety Risks” are not inchoate “traffic” issues or fire risks to residents who live on substandard streets in the hills of Palo Alto or Los Altos well above the proposed development.
Waivers must be granted upon request to facilitate the project as designed by the Developer at the density permitted by law
T H E O A K S · 4 1 0 3 O L D T R A C E R O A D , P A L O A L T O · C I T Y C O U N C I L · M A Y 1 8 , 2 0 2 6 Voluntary and Responsive Safety Improvements over
Existing Conditions
.
PEDESTRIAN SAFETY
New Sidewalk on
Old Trace Road
+ intersection ramp upgrades
Added in direct response to
community concerns about
existing conditions, with planned
upgrades to the intersection
sidewalk ramps to improve
accessibility.
PARKING
Secondary Access
to Arastradero
Second access route from Old
Trace Road
Added right turn on Arastradero
creates two means to access
Arastradero and limits the need
to use the crossing for both left
and right turns.
EMERGENCY ACCESS
Red Curb Striping
for Fire Access
Painted curb to prevent overflow
parking
Red curb striping will be added
along Old Trace Road opposite
the site to keep the curb clear
and guarantee fire trucks have
full, unobstructed access into the
project and for residents near
project frontage
T H E O A K S · 4 1 0 3 O L D T R A C E R O A D , P A L O A L T O · C I T Y C O U N C I L · M A Y 1 8 , 2 0 2 6 Thank You
D E V E L O P E R
Steel Bridge Homes
Palo Alto, LP
A P P L I C A T I O N
25PLN -00296
A D D R E S S
4103 Old Trace Road
Palo Alto, CA
T H E O A K S · 4 1 0 3 O L D T R A C E R O A D , P A L O A L T O · C I T Y C O U N C I L · M A Y 1 8 , 2 0 2 6