Cities Index.
Agenda packet

Paradise City Council
November 12, 2024

Document
Agenda packet
Meeting
November 12, 2024
Body
Paradise City Council
Pages
26
Original file
77.2 MB
Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

Town of Paradise
Town Council Meeting Agenda
6:00 PM – November 12, 2024
Town of Paradise Council Chamber – 5555 Skyway, Paradise, CA

Meeting Procedures
I. The Mayor is the Presiding Chair and is responsible for maintaining an orderly meeting. The Mayor calls the meeting to order and introduces each item on the agenda.

II. The Town staff then provides a report to Council and answers questions from the Council.

III. Citizens are encouraged to participate in the meeting process and are provided several opportunities to address Council. Any speaker addressing the Council is limited to three minutes per speaker - fifteen minutes per agenda item A. If you wish to address the Council regarding a specific agenda item, please complete a “Request to Address Council” card and give it to the Town Clerk prior to the beginning of the meeting. This process is voluntary and allows for citizens to be called to the speaker podium in alphabetical order.

Comments and questions from the public must be directed to the Presiding Chair and Town Council Members (please do not address staff.) Town staff is available to address citizen concerns Monday through Thursday at Town Hall between the hours of 8am and 5pm.

B. If you wish to address Council regarding an item not on the agenda, you may do so under Item 4, “Public Communication.” Again, please fill out a card and give it to the Town Clerk before the meeting. State Law prohibits Council action on items not listed on a public agenda.

In compliance with the Americans with Disabilities Act (ADA) Compliance, persons who need special accommodations to participate in the Town Council meeting may contact the Town Clerk at least three business days prior to the date of the meeting to provide time for any such accommodation.

Town Manager, Jim Goodwin
Town Attorney, Scott E. Huber
Town Clerk/Elections Official, Melanie Elvis
CDD, Planning & Onsite, Susan Hartman
CDD, Building & Code Enforcement, Tony Lindsey
Finance Director/Town Treasurer, Aimee Beleu
Public Works Director/Town Engineer, Marc Mattox
Division Chief, CAL FIRE/Paradise Fire, Garrett Needles Chief of Police, Eric Reinbold
Recovery & Economic Development Director, Colette Curtis Human Resources & Risk Management Director, Crystal Peters Information Systems Director, Luis Marquez
Mayor, Ron Lassonde
Vice Mayor, Greg Bolin
Council Member, Steve Crowder
Council Member, Steve “Woody” Culleton
Council Member, Rose Tryon
1 1. OPENING
1a. Call to Order
1b. Pledge of Allegiance to the Flag of the United States of America 1c. Invocation
1d. Roll Call
1e. Representatives from Voices United will accept a proclamation recognizing November as Homeless Youth Awareness Month. (Melanie Elvis/Town Clerk)
1f. Camp Fire Recovery Updates - Written reports are included in the agenda packet.
p5 Colette Curtis, Recovery and Economic Development Director - recovery projects, advocacy, economic recovery and development, communications, emergency operations and Housing updates.
p10 Marc Mattox, Public Works Director/Town Engineer -infrastructure and sewer updates.
p15 Tony Lindsey, CDD-Building and Code Enforcement- Code Enforcement update.

2. CONSENT CALENDAR
One roll call vote is taken for all items. Consent items are considered to be routine business that does not call for discussion.
2a. p19 Approve the minutes of the October 8, 2024 Regular Town Council meeting. (Melanie Elvis/Town Clerk)
2b. p25 Approve October 2024 Cash Disbursements in the amount of $10,692,438.24. (Aimee Beleu/Finance Director)
2c. p35 Review and file the 1st Quarter Investment Report for the Fiscal Year Ending June 30, 2025. (Aimee Beleu/Finance Director)
2d. p60 1. Waive the second reading of Town Ordinance No. 638 and read by title only; and, 2. Adopt Town Ordinance No. 638 “An Ordinance Amending Text Regulations within Paradise Municipal Code Title 17 [Zoning] Relative to Electronic Changeable Message Sign Regulations.” (Susan Hartman/Community Development Director)
2e. p65 1. Declare the attached described equipment as surplus property; and

2. Adopt Resolution No. 2024-___, “A Resolution of the Town Council of the Town of Paradise, Declaring Certain Town Equipment to be Surplus and Obsolete and Authorizing Disposal by the Town Manager or His Designee.” (Marc Mattox/Town Engineer)

3. ITEMS REMOVED FROM CONSENT CALENDAR

4. PUBLIC COMMUNICATION
For matters that are not on the Council business agenda, speakers are allowed three (3) minutes to address the Council. The Town Council is prohibited from taking action 2 3
on matters that are not listed on the public agenda. The Council may briefly respond for clarification and may refer the matter to the Town staff.

5. PUBLIC HEARINGS
For items that require a published legal notice and/or a mailed notice.

Public Hearing Procedure:

A. Staff Report
B. Mayor opens the hearing for public comment in the following order:
i. Ask Town Clerk if there are any cards submitted
ii. Ask if there is anyone else wishing to comment
C. Mayor closes the hearing
D. Council discussion and vote
5a. p67 1. Hold a public hearing to hear all objections to the proposed removal of vegetative growth or refuse and allow or overrule any objections; and,

2. Authorize staff to proceed and perform the abatement work as soon as possible; and, 3. Approve staff-recommended budget adjustment; or, 4.

Provide alternative direction to Town staff. (ROLL CALL VOTE) (Tony Lindsey/Community Development Director)

6. COUNCIL CONSIDERATION
Action items are presented by staff and the vote of each Council Member must be announced. A roll call vote is taken for each item on the action calendar. Citizens are allowed three (3) minutes to comment on agenda items.
6a. p86 1. Hear a report on the Expansion Study completed by Pioneer Community Energy; and 2. Consider directing staff to bring back a draft ordinance for Council consideration on a future agenda. (Colette Curtis/Recovery & Economic Development Director)
6b. p88 Consider approving a Memorandum of Understanding with Butte County for services with VEOCI virtual EOC software. (ROLL CALL VOTE) (Colette Curtis/Recovery & Economic Development Director) 6c. p102 Consider reviewing and approving the Town of Paradise Emergency Warning Sirens Guidelines. (ROLL CALL VOTE) (Colette Curtis/Recovery & Economic Development Director)
6d. p118 1. Provide staff with consensus on proposed standards for zoning amendments in the Downtown to present for adoption at a future council meeting, or, 2. Provide alternative direction to Town staff. (Susan Hartman/Community Development Director)
6e. p184 1. Consider adopting Town of Paradise Urgency Ordinance No. 639, “An Urgency Ordinance of the Town Council of the Town of Paradise Amending Portions of Chapter 2.45 of the Paradise Municipal Code Relating to the Town’s Purchasing System”; or, 2. Direct an alternative directive to Town staff. (ROLL CALL VOTE) (Scott E. Huber/Town Attorney)
6f. p188 Provide staff with direction on desired changes, if any, to the Paradise Municipal Code to present at a future Council meeting. (Tony Lindsey/Community Development Director)
3 6g. p191 1. Consider concurring with staff recommendation to file a CEQA Notice of Exemption for the Camp Fire Hydrant Repair Project; and,

2. Adopt Resolution No. 2024-___, “A Resolution of the Town Council of the Town of Paradise Approving the Plans, Specifications and Estimate for the Camp Fire Hydrant Repair Project and Authorizing Advertisement for Bids on the Project”. (ROLL CALL VOTE) (Marc Mattox/Town Engineer)

7. COUNCIL INITIATED ITEMS AND REPORTS
7a. Council initiated agenda items
7b. Council reports on committee representation
7c. Future Agenda Items

8. STAFF COMMUNICATION
8a. Town Manager Report

9. CLOSED SESSION - None

10. ADJOURNMENT

4 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 1(f)
ORIGINATED BY: Colette Curtis, Recovery and Economic
Development Director
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Monthly Recovery Update

LONG TERM
RECOVERY PLAN:

Yes
COUNCIL ACTION REQUESTED:

1. None
Background:

This report continues the Monthly Updates provided to keep the Town Council apprised of important developments related to the recovery of the Town of Paradise from the Camp Fire.

Included in this update are items related to recovery projects, advocacy economic recovery and development, communications and emergency operations.

Analysis:

ECONOMC DEVELOPMENT
CDBG-DR Economic Development
 The Town of Paradise submitted an application for a Workforce Training Center, located on the Paradise High School campus.
 The project is a partnership between the Town of Paradise, Butte College, PUSD, Valley Contractors Workforce Foundation, and NoRETC.
 The Standard Agreement is being routed for signature.

Healthcare
 The Town of Paradise and Adventist Health Feather River Foundation are working together to create a Strategic Healthcare Recovery Plan to assess current inventory, exiting gaps, projections, and a strategic plan for filling the gaps.  The Plan is expected to be ready by Spring 2025.

Biz Pro Academy
 In an effort to make the path to opening a business in Paradise easier, the Town is creating a training program for local volunteers to help potential business owners through the process as mentors.
 The program is under development, with a goal of holding the first training in Spring 2025. 5 RECOVERY
Overall Hazard Mitigation Project Update
Years of efforts are complete on the pre-award work on all our projects. All projects are fully approved and funded.

Category 4 Tree Removal Program
 Project is fully funded and moving forward.
 Work has officially begun on completing the required property survey work in order to have properties ready for tree removal that we anticipate beginning in January.  Contracts are in place and executed for all necessary roles with the exception of the tree cutting contractor. The RFP process for that is ongoing and we expect to bring a contract to council at the December meeting.
 376 properties are moving forward with tree removal. These properties represent over 90% of the total trees eligible for removal in the program from Phase 1 assessments..

Early Warning System
 All 21 Towers are standing and operational.
 21 of the 21 standing Towers have all aesthetic branches installed.  20 of the 21 Towers are now fully complete.
 The final tower is in the final stages of power engineering with PG&E.  Infrastructure for the in-home units is beginning we and expect the first units to arrive and be distributed this winter.
 We are working with contractors to turn over full control of the system to the TOP dispatch center.
 The operational guidelines are being presented to Town Council in November for approval.

Residential Ignition Resistant Retrofit Program
 Project is fully funded and moving forward.
 All necessary Archeological and Architectural survey contracts are in place and preconstruction survey work is beginning on properties moving forward with improvements  We recently reached out to all property owners to confirm their intent to move forward with improvements and confirm eligibility. Approximately 60% have responded already and are moving forward to the next step.
 We hope that the first properties will be moving forward with obtaining construction bids in the next month.

Hazardous Fuels Reduction Program
 Project is fully funded and moving forward.
 Town staff are working with involved monitoring tribes on a plan and timeline for implementation.
6 Defensible Space Code Enforcement
 The Defensible Space Code Enforcement project was fully approved and obligated in November 2023 by FEMA and CalOES.
 Town Staff are coordinating the process to implement this project in order to have the program operating for the Spring 2024 inspection season.  Town Council approved implementation plan in January 2024.  Grant funded staff have been hired and are in place and working in the community, this program has assisted in the Town reaching the record 92% compliance rate.

COMMUNICATIONS
6 th Anniversary Event Nov. 9th
 A community daffodil planting event was held on Saturday November 9th, in coordination with the Rebuild Paradise Foundation ribbon cutting for their “Future is Bright” murals in Paradise Community Park.

EMERGENCY MANAGEMENT
 The Town, in cooperation with Butte County and other local jurisdictions is contracting with VEOCI for virtual EOC solution. This item is on tonight’s Council agenda.

Financial Impact:

None.
7 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 1(f)
ORIGINATED BY: Sarah Richter, Housing Program Technician REVIEWED BY: James Goodwin, Town Manager
SUBJECT: Housing Recovery Update

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. None
Background:

This report provides the Town Council with an update on Housing activities.

Analysis:

We have 36.89% of our pre-disaster housing stock to-date (1,720 surviving units + 3,109 new CofOs to-date [an increase of 29 from last month] = 4,829 habitable dwellings / 13,091 housing units before the Camp Fire). An additional 240 building permits for 262 housing units were issued in 2024 and do not yet have their certificate of occupancy. In previous updates to Council, the number of pre-fire housing structures was being compared against post-fire housing units. Our total number of habitable dwellings does not include the number of mobile homes replaced in mobile home parks because those permits are issued by HCD instead of the Building Dept., but mobile homes are included in the total number of pre-fire housing units. A count of replaced mobile homes is under way which will add to the total number of habitable dwellings in Paradise.

Town of Paradise Owner-Occupied Rehabilitation/Reconstruction Program ($16 million) -- This program helps homeowners rehabilitate or reconstruct their home. We have completed 62 homes, 6 are under construction, and 4 applications in process. HCD recently allowed the grantees to increase loan amounts under the CalHome OOR program to $250,000 when reconstructing a residence. The Housing Dept. made a “last call” for applicants who need to rebuild their home because the expenditure deadline for funds is at the end of 2025. However, the Housing Dept will continue to take applications for non-fire related repairs as funding allows.

Town of Paradise First-Time Homebuyer Program ($7 million) -- Helping to make home ownership more affordable. We have assisted 47 households to-date and have 16 applications in process.

CDBG-DR Multifamily Rental Housing Program ($55 million) -- Affordable rental housing. Seven (7) projects are eligible for funding; a total of 292 units. One project (CHIP, 4 units) has leased up; Eagle Point (43 units) received a Certificate of Occupancy on Sept. 30th and is now accepting rental applications; Mayer Commons (12 units) on Kay Ct. continues to pass inspections, scheduled to be done in April of 2025; Northwind Senior (21 units) on the corner of Pentz and Kingdom Ct. is working on framing with an expected completion time of May of 2025; Cypress 8 Family (70 units) on Cypress Ln., is also working on framing and expects to be ready in December of 2025.

The 2 remaining projects (Cypress Senior, 70 units, and Clark Rd., 72 units) are working on securing additional funding and will be applying for tax credits in early 2025.

CDBG (2024 Annual Allocation=$52,474; unspent funds=$90,410.48) – Our annual grant for fiscal year 2024 is only 52% of the previous year’s award. Awards are determined by weighing a community’s population, rate of poverty, and number of overcrowded units. The data HUD uses is years behind, so our allocation is only now reflecting our Camp Fire population loss. The Annual Plan for 2024 allocates funds to economic development. CV funds ($208,244 not included above) can assist households living in RVs with emergency rental assistance; applications available now; 1 application has been approved.

HOME Infill New Construction ($700,000) -- Create affordable housing for first-time homebuyers.

Grant has been awarded but still waiting for Standard Agreement from HCD.

Permanent Local Housing Allocation (PLHA) ($399,166) – Allocates matching funds to North Valley Housing Trust to administer for affordable housing projects. A predevelopment loan of $400,000 has been made ($200,000 of PLHA funds) and another $75,000 of PLHA funds was loaned to build a small, single-family home, which is nearing completion.

Financial Impact:

None.
9 1

TOWN OF PARADISE
Council Agenda Summary
Date: November 12, 2024
Agenda No. 1(f)
ORIGINATED BY: Marc Mattox, Public Works Director / Town Engineer REVIEWED BY: Jim Goodwin, Town Manager

SUBJECT: Camp Fire Recovery Updates - Infrastructure
COUNCIL ACTION REQUESTED:

1. None, written monthly update only.

Background:

This report continues the Monthly Disaster Recovery Updates provided to keep the Town Council apprised of important developments related to the recovery of the Town of Paradise from the Camp Fire.

Analysis:

Road Rehabilitation
The Town of Paradise is endeavoring to pave every public road mile by the end of 2026. These projects are funded through Camp Fire Recovery Projects and are sequenced behind undergrounding of utilities and water service later replacements.

As of October 2024, the following paving progress can be reported:

25.3 mi. Completed

21.3 mi. Awarded/Under Construction

50.3 mi. Planned 2025 & 2026

96.9 mi. Total
In August 2024, Knife River Construction began work along various roadways in Town, map shown on next page. Recent work includes heavy road rehabilitation involving pulverizing and paving new roadway surfaces. Ongoing work includes final paving lifts, shoulder backing, driveway conforms, raising utility valves to grade and final striping. All work in the fall 2024 phase is anticipated to be completed before the end of November. Select roadways under the current contract will have work commence in spring 2025 due to ongoing utility clearance efforts. 10 2
Paradise Sewer Project
Work is ongoing for the Paradise Sewer Project’s Progressive Design Build delivery. 11 3
 Main Accomplishments
o Received the Draft BODR from the PDB team.
o Prepared for the November 15 project update meeting at Town Hall with the DFA, SWRCB and HCD teams to align on project funding support. o Met with City of Chico and Butte County teams for coordination on all project components including roadway design criteria and Chico WPCP connection details.
o Continue coordination of all permit applications, including interactions with USFWS, NMFS, CDFW, CVRWQCB, CVFPB, SHPO, and USACE.
 Key Activities (One Month Look-Ahead)
o Continue coordination of all permit applications, including interactions with USFWS,
o NMFS, CDFW, CVRWQCB, CVFPB, SHPO, and USACE.
o Meet with the DFA, SWRCB & HCD teams to align on project funding support. o Continue support for all project funding activities.
o Finalize review of the Draft BODR and updated project Cost Model and Schedule.

Capital Project Updates
Below is an abbreviated Project List intended to show the current status of each project. More information on each project’s scope and schedule can be found at www.townofparadise.com/pwe.

Typical project progressions and timeframes are as follows:
(1) Environmental, 6-24 months
(2) Design, 12 months
(3) Right of Way, 6-12 months
(4) Construction, 6-24 months
Project ID Project Title Project
Phase
Anticipated
Construction
Completion
Year
7301 On-System Culvert Replacement Complete -
7302 On-System Hardscape Replacement Complete -
7303 On-System Road Rehabilitation Construction 2026
7304 On-System Sign Replacement Complete -
7307 Neal Road Rehabilitation Design 2028
8404 Camp Fire Hydrant Repairs Design 2025
8407 Off-System Road Rehabilitation Construction 2026
8408 Off-System Culvert Repair Complete -
9389 Pentz Pathway Project Phase II Design 2028
9390 Paradise ATP Gateway Project (Neal Road
Class I) Environmental 2028
9391 Oliver Curve Pathway Phase I Design 2028
9394 Paradise Sewer Project Design 2031
12 4
9421 Forest Service Road Improvements Environmental 2027 9422 Foster/Black Olive Intersection Improvements Environmental 2027 9423 Elliott/Nunneley Road Extension Environmental 2027 9424 Skyway Link ATP (Bille to Wagstaff) Environmental 2027 9425 Upper Skyway Widening (Bille to Wagstaff) Environmental 2027 9426 Skyway/Pentz Intersection Improvements Environmental 2028 9427 Pentz Road Widening Environmental 2028
9428 Roe Road Phase 1 (Pentz to S. Libby) Environmental 2028 9430 Pearson-Hilltop Guard Rail Design 2025
9433 Animal Shelter Expansion Construction 2025
9434 Roe Road Phase 2 (S. Libby to Clark) Environmental 2028 Funding Pursuits
Below is a listing of active funding pursuits related to infrastructure recovery and status updates:

Program Project Title Amount
Requested
Anticipated
Award
Notification
Notes
RAISE 2025
Roe Road
Extension
Phase 2
Project
$25M June 2025
Project qualifies for reserved
funding in 2025 as a “Project of
Merit” in 2024. Streamlined reapplication process. Application due in early 2025.

Federal CDBGDR MIT RIP
Evacuation
Route
Changeable
Message Sign
Project
$5.4M Summer 2024
Project has been formally
awarded. Town waiting on HCD
Agreements to advance to
project kickoff.

Federal CDBGDR MIT RIP
Storm Drain
Resiliency
Project
$3.9M Summer 2024
Project has been formally
awarded. Town waiting on HCD
Agreements to advance to
project kickoff.

Federal CDBGDR MIT RIP
Private Road
Identification
Safety Project
$960,000 Summer 2024
Project has been formally
awarded. Town waiting on HCD
Agreements to advance to
project kickoff.
13 5
State CTC
Active
Transportation
Program Cycle
7 Oliver Curve
Pathway
Project
$15.5M October 2024
Project was not selected for
State funding. Program was over
subscribed and allocated only
$168M amongst $2.5B in
application requests.
14 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 1(f)
ORIGINATED BY: Tony Lindsey, Community Development Director, Building & Code Enforcement
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Camp Fire Recovery Updates – Code Enforcement

LONG-TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Code Enforcement Update
Background:

The Code Enforcement Division is committed to fostering a safe and appealing living and working environment. Our mission is to uphold and enhance our community's overall quality through the fair and impartial implementation of an enforcement program to rectify violations of municipal codes and land use regulations. In collaboration with residents, neighborhood associations, public service agencies, and other Town departments, we strive to:
 Promote voluntary compliance with Town codes.
 Identify and address violations promptly and fairly.
 Foster collaboration efforts to address community concerns.  Actively engage with the community in navigating the code enforcement process.

Analysis:

Under the original Urgency Ordinance, 206 RV Temporary Use Permits (TUPs) were issued.

However, only 56 are currently occupied (Exhibit A).

October September
Parcels permitted to occupy an RV 56 59
Accessory structures 13 13
RV Code Enforcement activity. Parcels with RV violations. (Exhibit B):

October September
Occupied/Unoccupied RVs 40 35
Occupied RVs with TUP Violations 2 7
Compliance gained/RV cases closed 6 8
The Community Enhancement Outreach Team, comprised of Disaster Case Managers, Fire Prevention, Housing, Police Department, and Code Enforcement personnel, visited permitted and unpermitted RV sites. Throughout these visits, the team engaged with community members to address unmet needs and provided information about available assistance programs. 15 October September
Sites Visited 13 11
Community members contacted 10 13
Tenants 3 8
Owner-occupied 7 5
Supplied contact information 8 8
Do not qualify/refused 0 0
Fire Prevention is crucial to our community's safety and supports our continued economic growth. It focuses on three primary goals: Education, Engineering, and Enforcement. Our defensible space and hazardous fuel management ordinance requires property owners to uphold fire-safe conditions regardless of residency. The dedicated Fire Prevention team conducts weed abatement inspections on 11,187 parcels throughout our community to ensure compliance and reduce fire hazards.

Escrow defensible space inspections October September
 Clearance requests received 85 78
 Certificates issued 76 71
 Land Surveyor's Certifications 25 9
 First inspection compliance rate 95% 83%
Weed abatement inspections
 Compliant parcels 10,586 – 94% 10,158 – 91%
 Active Code cases 560 756
 Commercial parcels 22 35
 Residential parcels 538 721
Other Code Enforcement Items:

Abandoned Vehicle Authority October September
 Vehicle Abatements 7 4
Additionally, Code Enforcement received complaints covering various issues, including waste and refuse problems, zoning violations, construction without the required permits, fire hazards, concerns about vehicles, unauthorized dwellings, cannabis, and the absence of garbage service.
16 TUPs under ORD 612 5/31/22
RV TUP STORAGE ONLY RV TUP OCCUPIED 7/27/2022
12/21/2023 12/21/2022
10 59 EXHIBIT A
632 6/26/2024
TUP - No Utilities Provided 5 RV TUP Extended 60 7/31/2024 8/28/2024 RV TUP OCCUPIED RV TUP Extended 606159 17 TUPs under ORD 612

RV TUP STORAGE ONLY RV TUP OCCUPIED
TUP Violations 5/31/22
Violations w/ TUP RV no TUP
12/21/2022 7/27/2022 EXHIBIT B 12 38
TUP Violations 12/21/2023 5/31/22 6/26/2024 7/27/2022 6/26/2024 12/21/2023 12/21/2022
7/31/2024 10 36 8/28/2024 8 33
18 TOWN COUNCIL
Meeting Minutes
6:00 PM – October 08, 2024

1. OPENING
The Regular meeting of the Paradise Town Council was called to order by Mayor Lassonde at 6:00 p.m. in the Town Council Chamber located at 5555 Skyway, Paradise, California who led the Pledge of Allegiance to the Flag of the United States of America.

An invocation was offered by Vice Mayor Bolin.

COUNCIL MEMBERS PRESENT: Greg Bolin, Steve Crowder, Steve “Woody” Culleton, Rose Tryon and Ronald Lassonde, Mayor
COUNCIL MEMBERS ABSENT: None
STAFF PRESENT: Town Manager Jim Goodwin, Town Attorney Scott E. Huber, Town Clerk/Elections Official Melanie Elvis, Finance Director/Town Treasurer Aimee Beleu, Community Development Director Susan Hartman, Community Development Director Tony Lindsey, Public Works Director/Town Engineer Marc Mattox, Recovery and Economic Development Director Colette Curtis, Recovery Project Manager Brian Solecki, Administrative Assistant Jacquelyn Blancett, Information Systems Technician Travis Thompson, Police Chief Eric Reinbold, Fire Chief Garrett Sjolund and Fire Chief Garrett Needles.

Mayor Lassonde opened the meeting with a reflection on former Mayor and Council Member Jody Jones and a moment of silence.
1a. Habitat for Humanity Butte County Executive Director Nicole Bateman, and Development Manager Jenny Fales presented project updates. 1b. Paradise Unified School District Superintendent Tom Taylor, Finance Director David McCready and Executive Director of Achieve Charter Schools of Paradise Casey Taylor provided an overview on Measure G and school reconstruction updates.
1c. Camp Fire Recovery Updates - Written reports are included in the agenda packet. (110-60-061)
Colette Curtis, Recovery and Economic Development Director - Recovery Projects, Advocacy, Economic Recovery and Development,
Communications, Emergency Operations and Housing Update.

Marc Mattox, Public Works Director/Town Engineer - Infrastructure and Sewer Update.
19 Tony Lindsey, CDD-Building and Code Enforcement-Code Enforcement Update.

2. CONSENT CALENDAR
MOTION by Bolin, seconded by Tryon, approved consent calendar items 2a through 2d and 2f through 2j with item 2e being removed from the consent calendar. Roll call vote was unanimous.
2a. Approved the Regular Minutes of the September 10, 2024 Town Council Meeting.
2b. Approved September 2024 Cash Disbursements in the amount of $3,826,964.18. (310-10-035)
2c. 1. Declared the described equipment as surplus property; and, 2. Adopted Resolution No. 2024-65, “A Resolution of the Town Council of the Town of Paradise Declaring Certain Town Equipment to be Surplus and Obsolete and Authorizing Disposal by the Town Manager or His Designee Thereof.” (380-10-003)
2d. Accepted a donation of $2,000 to help fund the Utility Box Mural Project. (395-50-024)
2e. ITEM REMOVED FROM THE CONSENT CALENDAR
2f. 1. Adopted Resolution No. 2024-66, “A Resolution of The Town Council of the Town of Paradise Authorizing Disposal of Certain Town Records Maintained in the Engineering Department Pursuant to Government Code Section 34090”; and, 2. Adopted Resolution No. 2024-67, “A Resolution of The Town Council of the Town of Paradise Authorizing Disposal of Certain Town Records Maintained in the Community Development Department Pursuant to Government Code Section 34090.” (160-20-017) 2g. 1. Approved Program Supplement Agreement No. 00000A678 to the Master Agreement Administering Agency-State Agreement for the FederalAid Projects, Agreement No. 03-5425S21 for Roe Road Extension Project Phase 2; and, 2. Adopted Resolution 2024-68 “A Resolution of the Town Council of the Town of Paradise authorizing the Town Manager of the Town of Paradise or their designee to sign the Program Supplement Agreement No. 00000A678 to the Administering Agency-State Agreement for FederalAid Projects corresponding to Project No. LTCL-5425(050).” (950-40-074) 2h. Approved the Archeological Professional Services Agreement and authorized the Town Manager to execute contract upon full obligation of the Residential Ignition Resistant Retrofit Program approval by FEMA and CalOES. (510-20-447, 440-60-021) Note: This action also adopted Resolution No. 2024-74, “A Resolution of the Town Council of the Town of Paradise Approving the Archeological Professional Services Agreement and Authorizing Execution of the Agreement” with Mountain Engineering, which 20 was not included in the “Council Requested Action” but was included as an attachment in the published agenda packet.
2i. Adopted Resolution No. 2024-69 “A Resolution of the Town Council of the Town of Paradise Adopting the September 2024 Local Hazard Mitigation Plan (LHMP).” (420-20-029)
2j. Adopted Resolution No. 2024-70, “A Resolution of The Town Council of The Town of Paradise Rescinding Resolution No. 2022-33 and Adopting New Home Owner-Occupied Housing Rehabilitation Program Guidelines.” (710-10-086)

3. ITEMS REMOVED FROM CONSENT CALENDAR
2e. Item 2e was pulled from the consent calendar by Council Member Tryon who asked Police Chief Eric Reinbold to provide an overview of the Selective Traffic Enforcement Program Grant.

MOTION by Culleton, seconded by Tryon, Approved an agreement with the California Office of Traffic Safety for the acceptance of the Selective Traffic Enforcement Program (STEP) grant award. Roll call vote was unanimous. (480-20-013)

4. PUBLIC COMMUNICATION
4a. Jon Remalia stated that the Town needs to figure out which properties it owns and to maintain them.
4b. Clint Front spoke on a notice of violation he received regarding signage on his property.

5. PUBLIC HEARINGS
5a. Community Development Director Susan Hartman provided an overview of proposed Ordinance No. 638 regarding electronic changeable message sign regulations.

Mayor Lassonde opened the public hearing at 6:50 p.m.

There were no public comments.

Mayor Lassonde closed the public hearing at 6:52 p.m.

MOTION by Culleton, seconded by Crowder, concurred with the project’s “CEQA determination” finding as presented and considered by the Planning Commission on September 17, 2024, and embodied within Planning Commission Resolution No 2024-02; and, 2. Waived the first reading of Town Ordinance No. 638 and read by title only; and, 3. Introduced Town Ordinance No. 638, “An Ordinance Amending Text Regulations within Paradise Municipal Code Title 17 [Zoning] Relative to Electronic 21 Changeable Message Sign Regulations”. Roll call vote was unanimous. (540-16-207)

6. COUNCIL CONSIDERATION
6a. Finance Director Aimee Beleu provided an overview of the Fiscal Year 2022/23 financial statement audit report.

MOTION by Bolin, seconded by Culleton, received and filed the Fiscal Year 2022/23 financial statement audit report, as submitted. Roll call vote was unanimous. (385-10-043)
6b. Finance Director Aimee Beleu provided an overview of the proposed resolution to amend the Salary Pay Plan to include Accounting Assistant I/II for the 24/25 FY.

MOTION by Bolin, seconded by Culleton authorized an Accounting Assistant I/II Full Time Equivalent (FTE) to be added to the Finance Department with the correlating budget adjustment; and, 2. Adopted Resolution No. 2024-71 “A Resolution of the Town Council of the Town of Paradise Adopting an Amended Salary Pay Plan for the Town of Paradise Employees to Include Accounting Assistant I/II for the Fiscal Year 2024- 2025.” Roll call vote was unanimous. (610-10-018)
6c. Community Development Director Tony Lindsey provided an overview of proposed Resolution No. 2024-72 declaring vegetative growth (noxious weeds) and refuse a public nuisance.

1. Jon Remalia spoke in favor of this item.

MOTION by Crowder, seconded by Culleton, 1. Adopted Resolution No. 2024-72, "A Resolution of the Town Council of the Town of Paradise Declaring Vegetative Growth (Noxious Weeds) and Refuse a Public Nuisance"; and, 2. Provided direction to staff that the Town would hold the first objection hearing to per Weed Abatement Implementation Plan at the November 12, 2024 Town Council meeting. Roll call vote was unanimous. (540-15-078)
6d. Fire Chief Garrett Needles provided an overview of the proposed contract amendment with the California Department of Forestry and Fire Protection (CAL FIRE).

MOTION by Bolin, seconded by Crowder, 1. Adopted Resolution No. 2024-73 “A Resolution of the Town Council of the Town of Paradise Approving the Third Amendment with the California Department of Forestry and Fire Protection (CAL FIRE) for Services from July 1, 2021 through June 30, 2025, Contract Agreement Number 2CA05233 for a maximum not to exceed amount of $19,148,445”. Roll call vote was unanimous. (510-20-296) 6e. Recovery and Economic Development Director Colette Curtis provided an overview of the proposed Workforce Development Memorandum of 22 Understanding (MOU) with Paradise Unified School District, Butte College, Valley Contractors Workforce Foundation, and NoRTEC.

MOTION by Tryon, seconded by Culleton, approved the Community Development Block Grant Disaster Recovery, Workforce Development Memorandum of Understanding (MOU) with Paradise Unified School District, Butte College, Valley Contractors Workforce Foundation, and NoRTEC. Roll call vote was unanimous. (710-10-104)

7. COUNCIL INITIATED ITEMS AND REPORTS
7a. Council initiated agenda items:
7a1. Council Member Crowder provided an overview of the proposed advocacy trip to Washington D.C.

1. Melissa Crick spoke in favor of this item.

MOTION by Culleton, seconded by Bolin, approved a trip to be taken by Council Member Steve Crowder to Washington D.C. to advocate for a tax relief bill for wildfire claimants to be funded by the Town Council budget up to $2000. Roll call vote was unanimous. 7b. Council reports on committee representation:

Council Member Tryon reported that she participated in a phone interview on Paradise’s rebuild process; attended the monthly Butte County Fire Safe Council Board meeting; and attended the Weed Abatement Standards Ad Hoc meeting.

Vice Mayor Bolin shared that there was no LAFCo meeting in October; he attended the Paradise High School Class of ‘84/’89 High School Reunion where he was asked to speak on recovery; and Johnny Appleseed Days.

Council Member Crowder attended the quarterly Town of
Paradise/Paradise Recreation and Park District Liaison meeting in September; a seminar with After the Fire; a presentation the County held on new proposed taxes; the Weed Abatement Ad Hoc meeting; and Johnny Appleseed Days.

Council Member Culleton shared that the monthly Solid Waste Committee meeting had been cancelled; and that he volunteered for the Paradise Ridge Chamber of Commerce during Johnny Appleseed Days.

Mayor Lassonde volunteered for Habitat for Humanity; met with members of the Butte County Grand Jury; attended Johnny Appleseed Days and had a meeting with staff on the Biz-Pro Process which seeks to streamline opening a business in Paradise.
23 7c. Future Agenda Items:

Council Member Tryon asked for a staff presentation on prescribed burns.

8. STAFF COMMUNICATION
8a. Town Manager Jim Goodwin shared that he hosted a meeting for Paradise Administrators from Paradise Recreation and Park District, Paradise Irrigation District, and Paradise Unified School District. 8b. Community Development Director Susan Harman shared that Eagle Pointe Apartments received a Certificate of Occupancy; Rental Guys received a temporary Certificate of Occupancy; the foundation has been poured on the Animal Control Expansion Project; that the Community Development Department is testing surface water samplings; a tire amnesty day to be hosted by NRWS; and, that Planning Commission will hold a public hearing on a 10-unit Multifamily Housing Complex at their next Regular Meeting.

9. CLOSED SESSION – None
Mayor Lassonde closed the meeting with a tribute to the late Jody Jones.

10. ADJOURNMENT
Mayor Lassonde adjourned the meeting at 8:20 p.m.

Date approved:

By: Attest:
____________________________ _____________________________ Ronald Lassonde, Mayor Melanie Elvis, Town Clerk/Elections Official 24 TOWN OF PARADISE

CASH DISBURSEMENTS REPORT

FOR THE PERIOD OF
October 1, 2024 - October 31, 2024
25 CASH DISBURSEMENTS REPORT
October 1, 2024 - October 31, 2024
Check Date Pay Period End Description Amount Total
10/11/2024 10/6/2024 Net Payroll - Direct Deposits and Checks $ 260,643.72 10/25/2024 10/20/2024 Net Payroll - Direct Deposits and Checks $ 260,089.15 $ 520,732.87
Accounts Payable
Payroll Vendors: Taxes, PERS, Dues, Insurance, Etc. 451,724.34 Operations Vendors: Supplies, Contracts, Utilities, Etc. $9,719,981.03 TOTAL CASH DISBURSEMENTS ACCOUNTS PAYABLE 10,171,705.37 GRAND TOTAL CASH DISBURSEMENTS $ 10,692,438.24
APPROVED BY:

Aimee Beleu - Finance Director/Town Treasurer
APPROVED BY:

Jim Goodwin - Town Manager
26 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
AP TCB - General Checking
Check
87548 10/03/2024 Open Accounts Payable 4LEAF, Inc $9,960.00 87549 10/03/2024 Open Accounts Payable ACCELA, INC. $4,204.72 87550 10/03/2024 Open Accounts Payable ACCELA, INC. $122,215.68 87551 10/03/2024 Open Accounts Payable ALHAMBRA $368.92 87552 10/03/2024 Open Accounts Payable ALLSTAR FIRE EQUIPMENT $2,192.13 87553 10/03/2024 Open Accounts Payable Amazon Capital Services $284.73 87554 10/03/2024 Open Accounts Payable AT&T $89.46
87555 10/03/2024 Open Accounts Payable AT&T & CALNET3 - CIRCUIT LINES $102.91 87556 10/03/2024 Open Accounts Payable AT&T/CALNET3 - REPEATER LINES $197.05 87557 10/03/2024 Open Accounts Payable AT&T/CALNET3 - COMMUNITY PARK
$28.86
87558 10/03/2024 Open Accounts Payable AT&T/CALNET3 - Summary $3,472.36 87559 10/03/2024 Open Accounts Payable AT&T/CALNET3 - Summary $29.06 87560 10/03/2024 Open Accounts Payable AT&T/CALNET3 - TH/FDPD FIBER LINES
$1,057.74
87561 10/03/2024 Open Accounts Payable Bear Electrical Systems, Inc $10,906.25 87562 10/03/2024 Open Accounts Payable Big O Tires $180.00 87563 10/03/2024 Open Accounts Payable Broad & Gusman $4,000.00 87564 10/03/2024 Open Accounts Payable Bug Smart $83.00 87565 10/03/2024 Open Accounts Payable Bureau Veritas North America, Inc $9,240.00 87566 10/03/2024 Open Accounts Payable Butte Co Environmental Health $434.00 87567 10/03/2024 Open Accounts Payable BUTTE CO RECORDER $2,051.00 87568 10/03/2024 Open Accounts Payable Butte County Information Systems $1,458.91 87569 10/03/2024 Open Accounts Payable CALIFORNIA STATE DEPARTMENT

OF JUSTICE
$625.00
87570 10/03/2024 Open Accounts Payable Corning Ford Inc. $59,268.53 87571 10/03/2024 Open Accounts Payable ENTENMANN-ROVIN COMPANY $476.67 87572 10/03/2024 Open Accounts Payable Explore Butte County $19,210.76 87573 10/03/2024 Open Accounts Payable FOOTHILL MILL & LUMBER $12.39 87574 10/03/2024 Open Accounts Payable FP/FRANCOTYP-POSTALIA

MAILING SOLUTIONS
$135.00
87575 10/03/2024 Open Accounts Payable GREAT AMERICA LEASING CORP. $215.07 87576 10/03/2024 Open Accounts Payable Habitat for Humanity of Butte County $125.00 87577 10/03/2024 Open Accounts Payable Hawkins Delafield & Wood LLP $3,750.00 87578 10/03/2024 Open Accounts Payable HDR Engineering, Inc $152,495.04 87579 10/03/2024 Open Accounts Payable HLP, INC / CHAMELEON

SOFTWARE PRODUCTS
$4.90
87580 10/03/2024 Open Accounts Payable Hope Crisis Response Network, Inc $20,836.80 87581 10/03/2024 Open Accounts Payable I.M.P.A.C. PAYMENTS IMPAC GOV

SVCS/US BANCORP
$1,079.98
87582 10/03/2024 Open Accounts Payable ILYA PETLINSKY $4,124.21 87583 10/03/2024 Open Accounts Payable JOHNNY ON THE SPOT

PORTABLES
$566.60
87584 10/03/2024 Open Accounts Payable Kevin Sharrah Designs $691.25 87585 10/03/2024 Open Accounts Payable KNIFE RIVER CONSTRUCTION $688.48 87586 10/03/2024 Open Accounts Payable LEHR AUTO ELECTRIC STOMMEL, INC.
$27,426.80
87587 10/03/2024 Open Accounts Payable LIFE ASSIST INC $226.94 87588 10/03/2024 Open Accounts Payable Look Ahead Veterinary Services $353.51 user: Aimee Beleu Pages: 1 of 8 Thursday, October 31, 2024 Payment Register

TOWN OF PARADISE
From Payment Date: 10/1/2024 - To Payment Date: 10/31/2024 27 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
87589 10/03/2024 Open Accounts Payable Matrix Consulting Group, LTD $9,650.00 87590 10/03/2024 Open Accounts Payable Meyers Police K-9 Training, LLC $1,050.00 87591 10/03/2024 Open Accounts Payable MID VALLEY TITLE & ESCROW $250.00 87592 10/03/2024 Open Accounts Payable MID VALLEY TITLE & ESCROW $602.00 87593 10/03/2024 Open Accounts Payable MID VALLEY TITLE & ESCROW $511.00 87594 10/03/2024 Open Accounts Payable MUNIMETRIX SYSTEMS CORP $39.99 87595 10/03/2024 Open Accounts Payable Murphys Construction $22,250.00 87596 10/03/2024 Open Accounts Payable Murphys Construction $9,300.00 87597 10/03/2024 Open Accounts Payable Murphys Construction $20,250.00 87598 10/03/2024 Open Accounts Payable NORTHSTAR $1,530.00 87599 10/03/2024 Open Accounts Payable Nutrien $33,318.50 87600 10/03/2024 Open Accounts Payable O'REILLY AUTO PARTS $889.66 87601 10/03/2024 Open Accounts Payable OFFICE DEPOT ACCT#36233169 $279.78 87602 10/03/2024 Open Accounts Payable Oroville Tow & Salvage $100.00 87603 10/03/2024 Open Accounts Payable PACIFIC GAS & ELECTRIC $1,601.64 87604 10/03/2024 Open Accounts Payable PARADISE IRRIGATION DIST $4,577.83 87605 10/03/2024 Open Accounts Payable Peters, Habib, McKenna, JuhlRhodes & Cardoza, LLP$1,150.50 87606 10/03/2024 Open Accounts Payable Richardson & Company, LLP $24,102.50 87607 10/03/2024 Open Accounts Payable Ridge Builders LLC $17,972.00 87608 10/03/2024 Open Accounts Payable SHI International Corp $3,181.61 87609 10/03/2024 Open Accounts Payable Sigler Pest Control $50.00 87610 10/03/2024 Open Accounts Payable Sigtronics Corporation $94.26 87611 10/03/2024 Open Accounts Payable SILAS BRANDON MCFALL $890.00 87612 10/03/2024 Open Accounts Payable Spherion Staffing $3,603.37 87613 10/03/2024 Open Accounts Payable Stratton Appraisals $400.00 87614 10/03/2024 Open Accounts Payable T MOBILE USA, INC. $1,830.73 87615 10/03/2024 Open Accounts Payable Tahoe Pure Water Co. $111.00 87616 10/03/2024 Open Accounts Payable TextMyGov $583.33 87617 10/03/2024 Open Accounts Payable Thau Handyman Services DBA Fire Safe NorCal
$800.00
87618 10/03/2024 Open Accounts Payable The Ferguson Group $239.30 87619 10/03/2024 Open Accounts Payable THOMAS ACE HARDWARE - ENG.

DEPT.
$1,147.97
87620 10/03/2024 Open Accounts Payable THOMAS ACE HARDWARE - FIRE DEPT.
$18.76
87621 10/03/2024 Open Accounts Payable THRIFTY ROOTER $7,812.88 87622 10/03/2024 Open Accounts Payable TOM'S TREE SERVICE $485.00 87623 10/03/2024 Open Accounts Payable Tri Flame Propane $29.74 87624 10/03/2024 Open Accounts Payable TUCKER PEST CONTROL INC $95.00 87625 10/03/2024 Open Accounts Payable Valley Iron Inc $1,287.01 87626 10/03/2024 Open Accounts Payable Vantage ID Applications, Inc. $13,459.13 87627 10/03/2024 Open Accounts Payable VERIZON WIRELESS $768.75 87628 10/03/2024 Open Accounts Payable Williams Scotsman, Inc. (Mobile Mini) $157.35 87629 10/03/2024 Open Accounts Payable WILSON PRINTING $432.01 87630 10/03/2024 Open Accounts Payable Amazon Capital Services $406.76 87631 10/03/2024 Open Accounts Payable Gustavo Diaz $494.50 87632 10/03/2024 Open Accounts Payable T MOBILE USA, INC. $1,671.95 87633 10/03/2024 Open Accounts Payable Tuck, Kevin $301.00 87634 10/10/2024 Open Accounts Payable Aflac $57.98
user: Aimee Beleu Pages: 2 of 8 Thursday, October 31, 2024 Payment Register

TOWN OF PARADISE
From Payment Date: 10/1/2024 - To Payment Date: 10/31/2024 28 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
87635 10/10/2024 Open Accounts Payable Met Life $12,856.44 87636 10/10/2024 Open Accounts Payable OPERATING ENGINEERS $986.00 87637 10/10/2024 Open Accounts Payable PARADISE POLICE OFFICERS

ASSOCIATION
$2,282.56
87638 10/10/2024 Open Accounts Payable SUN LIFE INSURANCE $9,846.08 87639 10/10/2024 Open Accounts Payable SUPERIOR VISION SVC INC $871.09 87640 10/10/2024 Open Accounts Payable TOP CONFIDENTIAL MID MGMT

ASSOCIATION
$95.00
87641 10/15/2024 Open Accounts Payable ICMA 457 - MissionSquare $2,060.28 87642 10/15/2024 Open Accounts Payable STATE DISBURSEMENT UNIT $656.29 87643 10/17/2024 Open Accounts Payable Cole Huber LLP $108,169.00 87644 10/17/2024 Open Accounts Payable ADVANCED DOCUMENT

CONCEPTS
$10.69
87645 10/17/2024 Open Accounts Payable ALLDATA $1,500.00 87646 10/17/2024 Open Accounts Payable Amazon Capital Services $948.08 87647 10/17/2024 Open Accounts Payable Asbury Environmental Services $102.00 87648 10/17/2024 Open Accounts Payable AT&T & CALNET3 - CIRCUIT LINES $764.08 87649 10/17/2024 Open Accounts Payable Axon Enterprise Inc $10,861.20 87650 10/17/2024 Open Accounts Payable Bear Electrical Systems, Inc $2,370.00 87651 10/17/2024 Open Accounts Payable Bidwell Truck & Auto $22,131.80 87652 10/17/2024 Open Accounts Payable Big O Tires $685.41 87653 10/17/2024 Open Accounts Payable Biometrics4ALL, Inc $8.25 87654 10/17/2024 Open Accounts Payable Blais & Associates, LLC $12,665.00 87655 10/17/2024 Open Accounts Payable Browns Towing $725.00 87656 10/17/2024 Open Accounts Payable Bug Smart $83.00 87657 10/17/2024 Open Accounts Payable Bureau Veritas North America, Inc $3,269.97 87658 10/17/2024 Open Accounts Payable BUTTE CO RECORDER $107.00 87659 10/17/2024 Open Accounts Payable BUTTE COLLEGE, PUBLIC

SERVICE CENTER
$3,697.36
87660 10/17/2024 Open Accounts Payable BUTTE REGIONAL TRANSIT $4.50 87661 10/17/2024 Open Accounts Payable BUTTE REGIONAL TRANSIT $373.35 87662 10/17/2024 Open Accounts Payable CALIFORNIA BUILDING

STANDARDS COMMISSION
$846.90
87663 10/17/2024 Open Accounts Payable CALIFORNIA STATE DEPARTMENT

OF CONSERVATION
$2,920.74
87664 10/17/2024 Voided Incorrect Vendor 10/29/2024 Accounts Payable Collision Pros - Paradise $8,944.12 87665 10/17/2024 Open Accounts Payable COMCAST CABLE $409.63 87666 10/17/2024 Open Accounts Payable COMCAST CABLE $429.63 87667 10/17/2024 Open Accounts Payable COMCAST CABLE $156.63 87668 10/17/2024 Open Accounts Payable COMCAST CABLE $414.63 87669 10/17/2024 Open Accounts Payable Contech Engineered Solutions $1,325.33 87670 10/17/2024 Open Accounts Payable CONTINENTAL BATTERY COMPANY $264.96 87671 10/17/2024 Open Accounts Payable DATCO SERVICES CORPORATION $328.50 87672 10/17/2024 Open Accounts Payable De Lage Landen Public Finance LLC $781.25 87673 10/17/2024 Open Accounts Payable Deja Vu Gardens Galore Nursery $1,616.25 87674 10/17/2024 Open Accounts Payable Dell Marketing LP $1,159.99 87675 10/17/2024 Open Accounts Payable Dokken Engineering, Inc. $75,165.91 87676 10/17/2024 Open Accounts Payable DURHAM PENTZ TRUCK CENTER $82.52 87677 10/17/2024 Open Accounts Payable Employment Development Dept $410.00 87678 10/17/2024 Open Accounts Payable ENERGUY $96.27
user: Aimee Beleu Pages: 3 of 8 Thursday, October 31, 2024 Payment Register

TOWN OF PARADISE
From Payment Date: 10/1/2024 - To Payment Date: 10/31/2024 29 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
87679 10/17/2024 Open Accounts Payable Entersect $109.95 87680 10/17/2024 Open Accounts Payable FOOTHILL MILL & LUMBER $23.59 87681 10/17/2024 Open Accounts Payable GREAT AMERICA LEASING CORP. $196.24 87682 10/17/2024 Open Accounts Payable GREEN RIDGE LANDSCAPING $7,660.64 87683 10/17/2024 Open Accounts Payable I.M.P.A.C. PAYMENTS IMPAC GOV

SVCS/US BANCORP
$20,281.05
87684 10/17/2024 Open Accounts Payable J.J.R. Enterprises Inc $1,853.24 87685 10/17/2024 Open Accounts Payable Jacobs Engineering Group Inc. $7,570.33 87686 10/17/2024 Open Accounts Payable Jennifer Arbuckle $4,250.00 87687 10/17/2024 Open Accounts Payable JOHNNY ON THE SPOT

PORTABLES
$186.65
87688 10/17/2024 Open Accounts Payable Kimball Midwest $17.68 87689 10/17/2024 Open Accounts Payable KNIFE RIVER CONSTRUCTION $111,515.75 87690 10/17/2024 Open Accounts Payable KNIFE RIVER CONSTRUCTION $104,969.39 87691 10/17/2024 Open Accounts Payable KOEFRAN INDUSTRIES $1,200.00 87692 10/17/2024 Open Accounts Payable L.N. CURTIS & SONS $538.63 87693 10/17/2024 Open Accounts Payable LACO Associates $7,500.00 87694 10/17/2024 Open Accounts Payable Law Office of Gregory P. Einhorn $1,280.00 87695 10/17/2024 Open Accounts Payable LIFE ASSIST INC $417.37 87696 10/17/2024 Open Accounts Payable Look Ahead Veterinary Services $359.03 87697 10/17/2024 Open Accounts Payable Mark Thomas & Company Inc $6,373.27 87698 10/17/2024 Open Accounts Payable Mercy Housing California 113, L.P. $1,718,987.81 87699 10/17/2024 Open Accounts Payable MODERN BUILDING INC. $172,650.80 87700 10/17/2024 Open Accounts Payable Mountain Cascade, Inc. $474,498.58 87701 10/17/2024 Open Accounts Payable NAPA Auto Parts $54.39 87702 10/17/2024 Open Accounts Payable NICHOLS, ROBERT $164.20 87703 10/17/2024 Open Accounts Payable North State Tire Co. Inc. $3,342.00 87704 10/17/2024 Open Accounts Payable NORTHERN RECYCLING & WASTE SERVICES, INC.
$6,029.69
87705 10/17/2024 Open Accounts Payable NORTHGATE PETROLEUM CO $7,411.00 87706 10/17/2024 Open Accounts Payable NORTHSTAR $714.00 87707 10/17/2024 Open Accounts Payable NV5, Inc. $27,917.69 87708 10/17/2024 Open Accounts Payable NV5, Inc. $3,190.90 87709 10/17/2024 Open Accounts Payable NV5, Inc. $958.95 87710 10/17/2024 Open Accounts Payable O'REILLY AUTO PARTS $1,319.30 87711 10/17/2024 Open Accounts Payable Oakley, Amannda $57.00 87712 10/17/2024 Open Accounts Payable OFFICE DEPOT ACCT#36233169 $57.37 87713 10/17/2024 Open Accounts Payable OROVILLE FORD $459.03 87714 10/17/2024 Open Accounts Payable Oroville Tow & Salvage $735.00 87715 10/17/2024 Open Accounts Payable Owen Equipment Sales $728.96 87716 10/17/2024 Open Accounts Payable PACIFIC GAS & ELECTRIC $17,163.97 87717 10/17/2024 Open Accounts Payable PARADISE POST $99.37 87718 10/17/2024 Open Accounts Payable Paradise Senior Associates, Limited Partnership
$363,219.98
87719 10/17/2024 Open Accounts Payable Payton Haury $494.50 87720 10/17/2024 Open Accounts Payable PICKERING, ROBERT $57.00 87721 10/17/2024 Open Accounts Payable PLATT ELECTRIC SUPPLY $65.83 87722 10/17/2024 Open Accounts Payable Redline Installations Inc $848.84 87723 10/17/2024 Open Accounts Payable Ridge Builders LLC $30,138.42 87724 10/17/2024 Open Accounts Payable Sheri Mailhiot $10.00 user: Aimee Beleu Pages: 4 of 8 Thursday, October 31, 2024 Payment Register

TOWN OF PARADISE
From Payment Date: 10/1/2024 - To Payment Date: 10/31/2024 30 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
87725 10/17/2024 Open Accounts Payable Sigler Pest Control $50.00 87726 10/17/2024 Open Accounts Payable Spherion Staffing $2,466.00 87727 10/17/2024 Open Accounts Payable Stiles Truck Body & Equipment, Inc. $6,296.65 87728 10/17/2024 Open Accounts Payable Stratti $6,178.85 87729 10/17/2024 Open Accounts Payable SUTTER BUTTES
COMMUNICATIONS, INC.
$4,790.24
87730 10/17/2024 Open Accounts Payable The Ferguson Group $5,000.00 87731 10/17/2024 Open Accounts Payable THOMAS ACE HARDWARE $48.52 87732 10/17/2024 Open Accounts Payable THOMAS ACE HARDWARE - ENG.

DEPT.
$455.69
87733 10/17/2024 Open Accounts Payable THOMAS ACE HARDWARE -

MOTORPOOL
$11.49
87734 10/17/2024 Open Accounts Payable Top Notch Commercial Cleaning Inc. $6,200.00 87735 10/17/2024 Open Accounts Payable Tri Flame Propane $49.86 87736 10/17/2024 Open Accounts Payable TRUEPOINT SOLUTIONS, LLC $82.50 87737 10/17/2024 Open Accounts Payable Urban Design Associates. LTD $31,590.50 87738 10/17/2024 Open Accounts Payable Utility Associates, Inc. $16,754.69 87739 10/17/2024 Open Accounts Payable VERIZON WIRELESS $1,367.20 87740 10/17/2024 Open Accounts Payable WILLDAN FINANCIAL SERVICES $350.00 87741 10/24/2024 Open Accounts Payable ICMA 457 - MissionSquare $2,314.01 87742 10/24/2024 Open Accounts Payable STATE DISBURSEMENT UNIT $656.29 87743 10/31/2024 Open Accounts Payable ACCESS INFORMATION

PROTECTED
$147.34
87744 10/31/2024 Open Accounts Payable ADVANCED DOCUMENT

CONCEPTS
$252.14
87745 10/31/2024 Open Accounts Payable AIRGAS SAFETY, INC. $12.96 87746 10/31/2024 Open Accounts Payable ALHAMBRA $205.58 87747 10/31/2024 Open Accounts Payable Amazon Capital Services $3,611.73 87748 10/31/2024 Open Accounts Payable AT&T $89.46
87749 10/31/2024 Open Accounts Payable AT&T & CALNET3 - CIRCUIT LINES $102.91 87750 10/31/2024 Open Accounts Payable AT&T/CALNET3 - REPEATER LINES $197.05 87751 10/31/2024 Open Accounts Payable AT&T/CALNET3 - COMMUNITY PARK
$29.14
87752 10/31/2024 Open Accounts Payable AT&T/CALNET3 - Summary $29.18 87753 10/31/2024 Open Accounts Payable AT&T/CALNET3 - Summary $3,482.90 87754 10/31/2024 Open Accounts Payable Big O Tires $50.00 87755 10/31/2024 Open Accounts Payable Butte County Public Health Dept - Health Clinic
$30.00
87756 10/31/2024 Open Accounts Payable CALIFORNIA STATE DEPARTMENT

OF JUSTICE
$568.00
87757 10/31/2024 Open Accounts Payable Collision Masters and Framework, Inc. $8,944.12 87758 10/31/2024 Open Accounts Payable COMCAST CABLE $429.63 87759 10/31/2024 Open Accounts Payable CONTINENTAL BATTERY COMPANY $407.03 87760 10/31/2024 Open Accounts Payable Dewberry Engineers Inc. $7,931.23 87761 10/31/2024 Open Accounts Payable DIVISION OF THE STATE

ARCHITECT
$249.90
87762 10/31/2024 Open Accounts Payable Dokken Engineering, Inc. $58,725.67 87763 10/31/2024 Open Accounts Payable DURHAM PENTZ TRUCK CENTER $1,211.20 87764 10/31/2024 Open Accounts Payable FEDERAL EXPRESS $46.82 87765 10/31/2024 Open Accounts Payable GREAT AMERICA LEASING CORP. $156.25 user: Aimee Beleu Pages: 5 of 8 Thursday, October 31, 2024 Payment Register

TOWN OF PARADISE
From Payment Date: 10/1/2024 - To Payment Date: 10/31/2024 31 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
87766 10/31/2024 Open Accounts Payable Hat Creek Construction & Materials, Inc.
$398,167.99
87767 10/31/2024 Open Accounts Payable HDR Engineering, Inc $148,036.37 87768 10/31/2024 Open Accounts Payable HLP, INC / CHAMELEON

SOFTWARE PRODUCTS
$4.55
87769 10/31/2024 Open Accounts Payable Housing Authority of the County of Butte
$235,109.12
87770 10/31/2024 Open Accounts Payable I.M.P.A.C. PAYMENTS IMPAC GOV

SVCS/US BANCORP
$231.78
87771 10/31/2024 Open Accounts Payable INTERSTATE OIL COMPANY $1,642.90 87772 10/31/2024 Open Accounts Payable JOHNNY ON THE SPOT

PORTABLES
$379.95
87773 10/31/2024 Open Accounts Payable KNIFE RIVER CONSTRUCTION $1,070.70 87774 10/31/2024 Open Accounts Payable KNIFE RIVER CONSTRUCTION $2,417,082.27 87775 10/31/2024 Open Accounts Payable KNIFE RIVER CONSTRUCTION $1,256,828.75 87776 10/31/2024 Open Accounts Payable Kruger, Christopher $387.00 87777 10/31/2024 Open Accounts Payable L.N. CURTIS & SONS $409.60 87778 10/31/2024 Open Accounts Payable LEHR AUTO ELECTRIC STOMMEL, INC.
$9,611.21
87779 10/31/2024 Open Accounts Payable LIFE ASSIST INC $345.94 87780 10/31/2024 Open Accounts Payable Mark Thomas & Company Inc $1,306.50 87781 10/31/2024 Open Accounts Payable Matrix Consulting Group, LTD $4,600.00 87782 10/31/2024 Open Accounts Payable Mendes Supply Company $392.38 87783 10/31/2024 Open Accounts Payable MID VALLEY TITLE & ESCROW $815.00 87784 10/31/2024 Open Accounts Payable Mountain Cascade, Inc. $412,842.39 87785 10/31/2024 Open Accounts Payable MUNIMETRIX SYSTEMS CORP $39.99 87786 10/31/2024 Open Accounts Payable NAPA Auto Parts $121.93 87787 10/31/2024 Open Accounts Payable Nichols-Melburg + Rossetto, AIA + Associates Inc
$4,553.80
87788 10/31/2024 Open Accounts Payable NORTHGATE PETROLEUM CO $9,795.24 87789 10/31/2024 Open Accounts Payable NV5, Inc. $5,716.71 87790 10/31/2024 Open Accounts Payable NV5, Inc. $65,255.75 87791 10/31/2024 Open Accounts Payable O'REILLY AUTO PARTS $151.71 87792 10/31/2024 Open Accounts Payable OFFICE DEPOT ACCT#36233169 $1,147.04 87793 10/31/2024 Open Accounts Payable OROVILLE FORD $660.62 87794 10/31/2024 Open Accounts Payable Oroville Tow & Salvage $300.00 87795 10/31/2024 Open Accounts Payable PACIFIC GAS & ELECTRIC $1,020.53 87796 10/31/2024 Open Accounts Payable PARADISE POST $117.47 87797 10/31/2024 Open Accounts Payable Paradise Senior Associates, Limited Partnership
$341,590.29
87798 10/31/2024 Open Accounts Payable Peters, Habib, McKenna, JuhlRhodes & Cardoza, LLP$1,062.00 87799 10/31/2024 Open Accounts Payable Psomas $62,098.15 87800 10/31/2024 Open Accounts Payable SACRAMENTO REGIONAL PUBLIC SAFETY TRAINING CTR.
$268.00
87801 10/31/2024 Open Accounts Payable Samons, Patti $240.00 87802 10/31/2024 Open Accounts Payable Samuel Jacob Solecki $1,400.00 87803 10/31/2024 Open Accounts Payable Sigtronics Corporation $59.72 87804 10/31/2024 Open Accounts Payable Spherion Staffing $2,409.60 87805 10/31/2024 Open Accounts Payable SUTTER BUTTES
COMMUNICATIONS, INC.
$150.00
user: Aimee Beleu Pages: 6 of 8 Thursday, October 31, 2024 Payment Register

TOWN OF PARADISE
From Payment Date: 10/1/2024 - To Payment Date: 10/31/2024 32 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
87806 10/31/2024 Open Accounts Payable Tahoe Pure Water Co. $111.00 87807 10/31/2024 Open Accounts Payable THOMAS ACE HARDWARE $1,118.11 87808 10/31/2024 Open Accounts Payable THOMAS ACE HARDWARE - ENG.

DEPT.
$35.89
87809 10/31/2024 Open Accounts Payable THOMAS ACE HARDWARE - FIRE DEPT.
$55.53
87810 10/31/2024 Open Accounts Payable THOMAS ACE HARDWARE -

MOTORPOOL
$71.74
87811 10/31/2024 Open Accounts Payable TOM'S TREE SERVICE $1,170.00 87812 10/31/2024 Open Accounts Payable Top Notch Commercial Cleaning Inc. $1,800.00 87813 10/31/2024 Open Accounts Payable Tri Flame Propane $31.40 87814 10/31/2024 Open Accounts Payable TUCKER PEST CONTROL INC $95.00 87815 10/31/2024 Open Accounts Payable Utility Associates, Inc. $33.00 87816 10/31/2024 Open Accounts Payable VERIZON WIRELESS $287.59 87817 10/31/2024 Open Accounts Payable Wallis, Roy $275.00 87818 10/31/2024 Open Accounts Payable Waste Tire Products R & D $2,524.50 87819 10/31/2024 Open Accounts Payable WILGUS FIRE CONTROL INC $446.68 87820 10/31/2024 Open Accounts Payable Williams Scotsman, Inc. (Mobile Mini) $157.35 Type Check Totals: 273 Transactions $9,623,073.05
EFT
66 10/10/2024 Open Accounts Payable CALPERS $155,970.64 67 10/14/2024 Open Accounts Payable EMPLOYMENT DEVELOPMENT

DEPARTMENT
$13,741.55
68 10/14/2024 Open Accounts Payable INTERNAL REVENUE SERVICE $44,516.96 69 10/15/2024 Open Accounts Payable CALPERS - RETIREMENT $65,591.32 70 10/15/2024 Open Accounts Payable ING LIFE INS & ANNUITY COMPANY $8,924.11 71 10/24/2024 Open Accounts Payable EMPLOYMENT DEVELOPMENT

DEPARTMENT
$13,173.23
72 10/24/2024 Open Accounts Payable ING LIFE INS & ANNUITY COMPANY $8,924.11 73 10/24/2024 Open Accounts Payable INTERNAL REVENUE SERVICE $42,183.03 74 10/28/2024 Open Accounts Payable CALPERS - RETIREMENT $65,607.37 Type EFT Totals: 9 Transactions $418,632.32
AP TCB - General Checking Totals
Checks Status Count Transaction Amount Reconciled Amount Open 272 $9,614,128.93 $0.00
Reconciled 0 $0.00 $0.00
Voided 1 $8,944.12 $0.00
Stopped 0 $0.00 $0.00
Total 273 $9,623,073.05 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 9 $418,632.32 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 9 $418,632.32 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 281 $10,032,761.25 $0.00
Reconciled 0 $0.00 $0.00
Voided 1 $8,944.12 $0.00
user: Aimee Beleu Pages: 7 of 8 Thursday, October 31, 2024 Payment Register

TOWN OF PARADISE
From Payment Date: 10/1/2024 - To Payment Date: 10/31/2024 33 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Stopped 0 $0.00 $0.00
Total 282 $10,041,705.37 $0.00
AP - US Bank TOP AP Checking
Check
85620 10/07/2024 Open Accounts Payable Town of Paradise $130,000.00 Type Check Totals: 1 Transactions $130,000.00
AP - US Bank TOP AP Checking Totals
Checks Status Count Transaction Amount Reconciled Amount Open 1 $130,000.00 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 1 $130,000.00 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 0 $0.00 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 0 $0.00 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 1 $130,000.00 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 1 $130,000.00 $0.00
Grand Totals:

Checks Status Count Transaction Amount Reconciled Amount Open 273 $9,744,128.93 $0.00
Reconciled 0 $0.00 $0.00
Voided 1 $8,944.12 $0.00
Stopped 0 $0.00 $0.00
Total 274 $9,753,073.05 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 9 $418,632.32 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 9 $418,632.32 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 282 $10,162,761.25 $0.00
Reconciled 0 $0.00 $0.00
Voided 1 $8,944.12 $0.00
Stopped 0 $0.00 $0.00
Total 283 $10,171,705.37 $0.00
user: Aimee Beleu Pages: 8 of 8 Thursday, October 31, 2024 Payment Register

TOWN OF PARADISE
From Payment Date: 10/1/2024 - To Payment Date: 10/31/2024 34 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 2(c)
ORIGINATED BY: Aimee Beleu, Finance Director/Town Treasurer REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Quarterly Investment Report

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

Review and file the 1st Quarter Investment Report for the Fiscal Year Ending June 30, 2025.

Background:

Attached is the report on the Town’s cash and investments for the quarter ending September 30, 2024.

A Tri-Counties checking account is currently being used for payroll, accounts payable and other operating purposes. Most accounts payable disbursements are drawn through checks, and most payroll disbursements are processed through direct deposit.

The Town utilizes the State of California managed Local Agency Investment Fund (LAIF) for investment of General Fund cash in excess of immediately needed operating capital. LAIF provides for same day liquidity as funds can be transferred electronically through computer authorization between LAIF and the Town checking account. LAIF has also provided historically competitive yields, with a return of 4.58% for the period ending September 30, 2024.

California CLASS is a joint exercise of powers entity authorized under Section 6509.7, California Government Code. California CLASS is a pooled investment option that was created via a joint exercise of powers agreement (JPA Agreement) by and among California public agencies.

California CLASS provides the Town with a convenient method for investing in high-quality, shortto medium-term securities carefully selected to optimize interest earnings while maximizing safety and liquidity. The California CLASS Prime fund has provided the Town with an opportunity to strengthen and diversify its cash management programs in accordance with the safety, liquidity, and yield hierarchy that governs the investment of public funds. CLASS has provided a very competitive yield, with a return of 5.04% for the quarter ending September 30, 2024.

The newest addition to Town’s investment portfolio is Tri-Counties Bank Money Market Account.

The Town also utilizes Tri-Counties Money Market Account for cash in excess of immediately needed operating capital. Tri-Counties provides for same day liquidity as funds can be transferred electronically through computer authorization between the Town’s checking accounts. Tri35 Counties Bank is providing competitive yields, with a return of 5.49% for the period ending September 30, 2024.

In July 2020, the Town received a net settlement from PG&E related to the 2018 Camp Fire in the amount of $219,187,262. Since that time, the Town continues to utilize four investment vehicles to manage these funds. Securities purchases are held in a custodial account with US Bank. The Town has contracted with Meeder Investments to assist with management of these funds. Excess funds that are not invested in specific securities are held in the State of California managed Local Agency Investment Fund (LAIF), California CLASS and Tri-Counties Bank Money Market Account. Future use of these funds continues to be evaluated through a long-term fiscal sustainability model. Based on current rebuild rates and revenue growth trends, at this time it is expected that at least 80% of the total fund balance will be required to be utilized for long-term revenue backfill to ensure continued fiscal sustainability. US Bank Custodial has provided yields of 2.27% for the quarter ending September 30, 2024.

In June of 2011, the Town established an irrevocable trust to begin funding the future obligations associated with retiree health as required by GASB 45. The funds are being managed by SelfInsured Schools of California (SISC) and can only be used for the payment of retiree health benefits. SISC has provided yields of .96% for the quarter ending September 30, 2024.

Overall Principal Cost: $209,594,131 Market Value: $207,244,622 Financial Impact:

Total gross investment earnings for the quarter ending September 30, 2024 are:

Custody
Acct. Class Tri Counties
LAIF 19-
04-002
LAIF 98-
04-630 Total
Q1
$
1,132,880
$
221,096
$
98,129
$
591
$
12,872
$
1,465,567
Q2
$
-
$
-
$
-
$
-
$
-
$
-
Q3
$
-
$
-
$
-
$
-
$
-
$
-
Q4
$
-
$
-
$
-
$
-
$
-
$
-
36 Town of Paradise Operating
Account
Quarterly Investment Report
September 30, 2024
Your Investment Representative:

Jim McCourt
(614) 923-1151
[email protected]
For questions about your account please contact your investment representative or contact [email protected] Dublin, Ohio | Lansing, Michigan | Long Beach, California | Austin, Texas | 866-633-3371 | www.meederpublicfunds.com 37 QUARTERLY RECONCILIATION
Beginning Book Value 184,963,724.76
Contributions
Withdrawals
Prior Month Management Fees (16,500.00)
Prior Month Custodian Fees (4,116.51)
Realized Gains/Losses 16,906.23
Purchased Interest (73,438.49)
Gross Interest Earnings 1,132,880.44
Ending Book Value 186,019,456.43

PORTFOLIO CHARACTERISTICS
Portfolio Yield to Maturity 2.27%
Portfolio Effective Duration 1.98 yrs
Weighted Average Maturity 2.17 yrs
Weighted Average Life 2.04 yrs

PROJECTED MONTHLY INCOME SCHEDULE

SECTOR ALLOCATION MATURITY DISTRIBUTION CREDIT QUALITY
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 2 of 23 Town of Paradise Operating Account

PORTFOLIO SUMMARY
As of September 30, 2024
38 CUSIP SECURITY DESCRIPTION Oct 2024 Nov 2024 Dec 2024 Jan 2025 Feb 2025 Mar 2025 Apr 2025 May 2025 Jun 2025 Jul 2025 Aug 2025 Sep 2025 023135CF1 Amazon.com, Inc. 3.300%
04/13/2027
33,000 33,000
03667PHE5 Antelope Valley
Community College District

0.866% 08/01/2025
736 736
037833CJ7 Apple Inc. 3.350%
02/09/2027
25,125 25,125
037833DB3 Apple Inc. 2.900%
09/12/2027
14,500 14,500
037833EB2 Apple Inc. 0.700%
02/08/2026
17,500 17,500
05580AE67 BMW Bank of North
America 0.650%
10/08/2024
1,496
13034AL65 California Infrastructure
and Economic
Development Bank 0.765%
10/01/2025
3,825 3,825
13063DC48 California, State of 1.700%
02/01/2028
7,650 7,650
13063DGB8 California, State of 3.375%
04/01/2025
8,016
14913R2Q9 Caterpillar Financial
Services Corporation

1.150% 09/14/2026
14,375 14,375
20056XAC2 Commerce, City of 1.212%
08/01/2026
3,182 3,182
206849GN5 Conejo Valley Unified
School District 0.974%
08/01/2025
998 998
20772KNX3 Connecticut, State of

1.123% 06/01/2026
12,353 12,353
21969AAE2 Corona, City of 1.361%
05/01/2026
13,100 13,100
24422EWD7 John Deere Capital
Corporation 2.350%
03/08/2027
17,625 17,625
30303M8L9 Meta Platforms, Inc.

4.600% 05/15/2028
69,000 69,000
3130AMWE8 FHLBANKS 1.00%
06/30/2028
10,000 15,000
3130ATUS4 FHLB 4.250% 12/10/2027 14,875 14,875
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 3 of 23 Town of Paradise Operating Account

PROJECTED INCOME SCHEDULE
As of September 30, 2024
39 CUSIP SECURITY DESCRIPTION Oct 2024 Nov 2024 Dec 2024 Jan 2025 Feb 2025 Mar 2025 Apr 2025 May 2025 Jun 2025 Jul 2025 Aug 2025 Sep 2025 3132XFRD2 Federal Home Loan
Mortgage Corporation

4.200% 07/01/2029
15,435 8,348 8,221 8,093 7,964 7,835 7,705 7,575 7,444 7,312 7,180 7,047 3133EMDZ2 FFCB 0.520% 10/21/2025 13,000 13,000
3133EMMR0 FFCB 0.470% 01/12/2026 5,499 5,499
3133EP4A0 FFCB 4.250% 02/28/2029 21,250 21,250
3133EPNH4 FFCB 3.875 06/21/2028 21,313 21,313
3133ERAK7 FFCB 4.375% 04/10/2029 54,688 54,688
3134GXFA7 FMCC 0.650% 11/26/2025 9,750 9,750
3134GXFV1 FMCC 0.625% 12/17/2025 7,813 7,813
3134GXJQ8 FMCC 0.320% 01/06/2025 3,675
3134GXKU7 FMCC 0.375% 01/29/2025 11,112
3135G06E8 FNMA 0.420% 11/18/2024 14,250
3135G06Q1 FNMA 0.640% 12/30/2025 9,600 9,600
3135G06R9 FNMA 0.550% 01/28/2026 8,250 8,250
3135GA2A8 FNMA 0.580% 10/28/2025 14,500 14,500
3137FKUN4 Federal Home Loan
Mortgage Corporation

3.591% 10/25/2027
5,089 4,998 4,907 4,816 4,724 4,632 4,540 4,447 4,354 4,261 4,167 4,073 3137FQK77 Federal Home Loan
Mortgage Corporation

2.512% 10/25/2026
5,172 5,018 4,863 4,709 4,553 4,397 4,241 4,084 3,927 3,769 3,611 3,452 3137HFF59 Federal Home Loan
Mortgage Corporation

4.618% 07/25/2029
11,545 11,545 11,361 11,176 10,991 10,804 10,617 10,428 10,239 10,049 3140LLEB3 Federal National Mortgage
Association, Inc. 4.390%
07/01/2028
3,668 3,596 3,524 3,452 3,379 3,306 3,232 3,158 3,084 3,010 2,935 2,860 31422B6K1 AGM 0.480% 01/15/2026 8,400 8,400
38149MZJ5 Goldman Sachs Bank USA
Holdings LLC 1.050%
09/08/2026
1,297 1,318
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 4 of 23 Town of Paradise Operating Account

PROJECTED INCOME SCHEDULE
As of September 30, 2024
40 CUSIP SECURITY DESCRIPTION Oct 2024 Nov 2024 Dec 2024 Jan 2025 Feb 2025 Mar 2025 Apr 2025 May 2025 Jun 2025 Jul 2025 Aug 2025 Sep 2025 419792ZL3 Hawaii, State of 0.852%
10/01/2025
21,300 21,300
4581X0EN4 IADB 4.125% 02/15/2029 68,269 68,269
459058JA2 IBRD 0.750% 03/11/2025 (5,859)
459058JL8 IBRD 0.500% 10/28/2025 12,500 12,500
459058JS3 IBRD 0.650% 02/10/2026 6,500 6,500
45950VPU4 IFC 0.75% 03/23/2026 7,500 7,500
482124SP0 Jurupa Unified School
District 1.059% 08/01/2025
2,648 (1,617)
50420BDE9 La Quinta, City Of 1.168%
09/01/2025
11,680 (11,280)
574193TR9 Maryland, State of 0.660%
08/01/2025
9,900 (4,680)
649791RA0 New York, State of 0.910%
03/15/2025
(2,890)
68609TWD6 Oregon, State of 0.895%
05/01/2025
7,831 (23,056)
69371RR99 PACCAR Financial Corp.

3.550% 08/11/2025
35,500 33,480
696735QQ5 Palmdale School District

1.071% 08/01/2026
1,339 1,339
713448FX1 PepsiCo, Inc. 4.500%
07/17/2029
26,550 26,550
742651DY5 PEFCO 1.400%
07/15/2028
20,475 20,475
742651DZ2 PEFCO 3.900%
10/15/2027
33,150 33,150
742718FZ7 Procter & Gamble
Company, The 3.950%
01/26/2028
39,204 39,204
7954507A7 Sallie Mae Bank 1.000%
07/14/2026
1,250 1,230
797299MM3 San Diego, City of 1.450%
10/15/2024
(15,147)
797412DM2 San Diego County Water
Authority 0.743%
05/01/2025
3,994 (2,994)
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 5 of 23 Town of Paradise Operating Account

PROJECTED INCOME SCHEDULE
As of September 30, 2024
41 CUSIP SECURITY DESCRIPTION Oct 2024 Nov 2024 Dec 2024 Jan 2025 Feb 2025 Mar 2025 Apr 2025 May 2025 Jun 2025 Jul 2025 Aug 2025 Sep 2025 79771FFM4 San Francisco, City &
County of 0.723%
11/01/2024
(1,463)
79771FFP7 San Francisco, City &
County of 0.723%
11/01/2024
(12,730)
79773KBG8 San Francisco, City &
County of 0.766%
06/15/2025
766 766
798186N81 San Jose Unified School
District 0.558% 08/01/2025
2,790 2,790
80182AAE9 Santa Cruz, County of

1.024% 06/01/2026
10,931 10,931
802649TJ2 Santa Rosa, City of

0.977% 09/01/2025
7,474 (16,884)
880591EZ1 TVA 3.875% 03/15/2028 40,688 40,688
89236TJZ9 Toyota Motor Credit
Corporation 3.050%
03/22/2027
26,688 26,688
89236TLN3 Toyota Motor Credit
Corporation 5.000%
01/22/2029
52,500 52,500
9128284N7 UST 2.875% 05/15/2028 31,625 31,625
912828X88 UST 2.375% 05/15/2027 34,438 34,438
91282CCP4 UST 0.625% 07/31/2026 7,813 7,813
91282CCW9 UST 0.750% 08/31/2026 9,375 9,375
91282CCZ2 UST 0.875% 09/30/2026 12,906 12,906
91282CEV9 UST 3.250% 06/30/2029 43,875 43,875
91282CEW7 UST 3.250% 06/30/2027 40,625 40,625
91282CFH9 UST 3.125% 08/31/2027 35,938 35,938
91282CFM8 UST 4.125% 09/30/2027 19,594 19,594
91282CFZ9 UST 3.875% 11/30/2027 54,250 54,250
91282CGP0 UST 4.000% 02/29/2028 44,500 44,500
91282CHK0 UST 4.000% 06/30/2028 50,000 50,000
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 6 of 23 Town of Paradise Operating Account

PROJECTED INCOME SCHEDULE
As of September 30, 2024
42 CUSIP SECURITY DESCRIPTION Oct 2024 Nov 2024 Dec 2024 Jan 2025 Feb 2025 Mar 2025 Apr 2025 May 2025 Jun 2025 Jul 2025 Aug 2025 Sep 2025 91282CHQ7 UST 4.125% 07/31/2028 51,563 51,563
91282CHX2 UST 4.375% 08/31/2028 44,844 44,844
91282CJA0 UST 4.625% 09/30/2028 58,391 58,391
91282CJR3 UST 3.750% 12/31/2028 37,500 37,500
91282CKG5 UST 4.125% 03/31/2029 51,563 51,563
91412HGE7 Regents of the University
of California, The 0.883%
05/15/2025
25,519 (57,298)
91412HJL8 Regents of the University
of California, The 0.670%
05/15/2025
5,025 5,025
931142FB4 Walmart Inc. 3.900%
04/15/2028
42,900 42,900
969268DG3 William S. Hart Union High
School District 0.757%
08/01/2025
3,785 3,785
TOTAL 252,591 276,547 292,710 268,904 373,809 306,876 259,571 163,907 294,076 250,262 349,093 264,462 6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 7 of 23 Town of Paradise Operating Account

PROJECTED INCOME SCHEDULE
As of September 30, 2024
43 CUSIP Security
Description
Trade Date/
Settlement
Date
Par Value
Principal Cost/
Purchased
Interest
Total Cost Yield at
Cost
Maturity/
Duration
Market Price/
Market Value
Unrealized Gain/
(Loss)
% of
Assets
Moody's/
S&P
Rating
Cash and Cash Equivalents
00266CASH LAIF-PG&E 9/30/2024
9/30/2024
$49,795.34 $49,795.34 $49,795.34 4.58% 0.003

0.003
$1.00
$49,795.34
$0.00 0.02% NR
00365CASH LAIF-GENERAL 9/30/2024
9/30/2024
$1,085,392.35 $1,085,392.35 $1,085,392.35 4.58% 0.003

0.003
$1.00
$1,085,392.35
$0.00 0.52%
00378CASH Tri Counties Bank
Money Market
Account x4138
9/30/2024
9/30/2024
$5,891,536.19 $5,891,536.19 $5,891,536.19 5.49% 0.003

0.003
$1.00
$5,891,536.19
$0.00 2.84%
31846V567 First American
Funds, Inc.
9/30/2024
9/30/2024
$278,396.13 $278,396.13 $278,396.13 4.78% 0.003

0.003
$1.00
$278,396.13
$0.00 0.13%
AAAm
00343CASH California CLASS
Prime Fund
9/30/2024
9/30/2024
$16,547,951.37 $16,547,951.37 $16,547,951.37 5.04% 0.003

0.003
$1.00
$16,547,951.37
$0.00 7.98%
SubTotal $23,853,071.38 $23,853,071.38 $23,853,071.38 5.13% $23,853,071.38 $0.00 11.51% Agency Bond
3135G06E8 FNMA 0.420%
11/18/2024
11/23/2020
11/24/2020
$5,000,000.00 $4,996,250.00 $4,996,250.00 0.44% 0.134

0.133
$99.39
$4,969,500.00
($26,750.00) 2.40% Aaa
AA+
3134GXJQ8 FMCC 0.320%
01/06/2025
1/27/2021
1/28/2021
$1,750,000.00 $1,749,125.00 $1,749,125.00 0.33% 0.268

0.267
$98.80
$1,729,035.00
($20,090.00) 0.83% Aaa
AA+
3134GXKU7 FMCC 0.375%
01/29/2025
1/11/2021
1/29/2021
$3,500,000.00 $3,495,450.00 $3,495,450.00 0.41% 0.332

0.331
$98.54
$3,448,865.00
($46,585.00) 1.66% Aaa
AA+
3133EMDZ2 FFCB 0.520%
10/21/2025
11/19/2020
11/20/2020
$5,000,000.00 $4,986,000.00 $4,986,000.00 0.58% 1.058

1.054
$96.19
$4,809,400.00
($176,600.00) 2.32% Aaa
AA+
3135GA2A8 FNMA 0.580%
10/28/2025
12/21/2020
12/22/2020
$5,000,000.00 $5,013,800.00 $5,013,800.00 0.43% 1.077

1.073
$96.31
$4,815,300.00
($198,500.00) 2.32% Aaa
AA+
3134GXFA7 FMCC 0.650%
11/26/2025
11/24/2020
11/30/2020
$3,000,000.00 $3,000,000.00 $3,000,000.00 0.65% 1.156

1.151
$96.17
$2,885,040.00
($114,960.00) 1.39% Aaa
AA+
3134GXFV1 FMCC 0.625%
12/17/2025
12/3/2020
12/17/2020
$2,500,000.00 $2,498,750.00 $2,498,750.00 0.64% 1.214

1.209
$95.86
$2,396,575.00
($102,175.00) 1.16% Aaa
AA+
3135G06Q1 FNMA 0.640%
12/30/2025
12/23/2020
12/30/2020
$3,000,000.00 $3,003,750.00 $3,003,750.00 0.61% 1.249

1.292
$95.90
$2,877,060.00
($126,690.00) 1.39% Aaa
AA+
3133EMMR0 FFCB 0.470%
01/12/2026
1/5/2021
1/12/2021
$2,340,000.00 $2,336,536.80 $2,336,536.80 0.50% 1.285

1.280
$95.46
$2,233,787.40
($102,749.40) 1.08% Aaa
AA+
31422B6K1 AGM 0.480%
01/15/2026
1/7/2021
1/15/2021
$3,500,000.00 $3,496,500.00 $3,496,500.00 0.50% 1.293

1.288
$95.60
$3,346,035.00
($150,465.00) 1.61%
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 8 of 23 Town of Paradise Operating Account

POSITION STATEMENT
As of September 30, 2024
44 CUSIP Security
Description
Trade Date/
Settlement
Date
Par Value
Principal Cost/
Purchased
Interest
Total Cost Yield at
Cost
Maturity/
Duration
Market Price/
Market Value
Unrealized Gain/
(Loss)
% of
Assets
Moody's/
S&P
Rating
3135G06R9 FNMA 0.550%
01/28/2026
1/5/2021
1/28/2021
$3,000,000.00 $3,000,000.00 $3,000,000.00 0.55% 1.329

1.324
$95.48
$2,864,490.00
($135,510.00) 1.38% Aaa
AA+
742651DZ2 PEFCO 3.900%
10/15/2027
6/14/2023
6/16/2023
$1,700,000.00 $1,680,883.50 $1,680,883.50 4.19% 3.041

2.848
$100.36
$1,706,154.00
$25,270.50 0.82% Aaa
AA+
3130ATUS4 FHLB 4.250%
12/10/2027
12/20/2022
12/21/2022
$700,000.00 $710,829.00 $710,829.00 3.90% 3.195

2.986
$102.04
$714,273.00
$3,444.00 0.34% Aaa
AA+
880591EZ1 TVA 3.875%
03/15/2028
3/28/2023
3/30/2023
$2,100,000.00 $2,088,678.90 $2,088,678.90 4.00% 3.458

3.266
$101.11
$2,123,234.40
$34,555.50 1.02% Aaa
AA+
3133EPNH4 FFCB 3.875
06/21/2028
6/15/2023
6/21/2023
$1,100,000.00 $1,095,105.00 $1,095,105.00 3.97% 3.726

3.470
$100.89
$1,109,735.00
$14,630.00 0.54% Aaa
AA+
3130AMWE8 FHLBANKS 1.00%
06/30/2028
5/14/2024
5/15/2024
$2,000,000.00 $1,792,380.00 $1,792,380.00 4.80% 3.751

3.637
$93.78
$1,875,620.00
$83,240.00 0.91% Aaa
AA+
742651DY5 PEFCO 1.400%
07/15/2028
9/8/2023
9/12/2023
$2,925,000.00 $2,532,336.30 $2,532,336.30 4.52% 3.792

3.690
$91.70
$2,682,236.70
$149,900.40 1.29% Aaa
AA+
3133EP4A0 FFCB 4.250%
02/28/2029
2/28/2024
2/29/2024
$1,000,000.00 $996,480.00 $996,480.00 4.33% 4.416

4.060
$102.64
$1,026,390.00
$29,910.00 0.50% Aaa
AA+
3133ERAK7 FFCB 4.375%
04/10/2029
4/18/2024
4/19/2024
$2,500,000.00 $2,466,060.00
$2,734.38
$2,468,794.38 4.68% 4.529

4.082
$103.10
$2,577,582.50
$111,522.50 1.24% Aaa
AA+
SubTotal $51,615,000.00 $50,938,914.50
$2,734.38
$50,941,648.88 1.57% $50,190,313.00 ($748,601.50) 24.22% Corporate Bond
69371RR99 PACCAR Financial
Corp. 3.550%
08/11/2025
8/10/2022
8/12/2022
$2,000,000.00 $2,002,020.00 $2,002,020.00 3.51% 0.863

0.855
$99.51
$1,990,120.00
($11,900.00) 0.96% A1
A+
037833EB2 Apple Inc. 0.700%
02/08/2026
2/2/2021
2/8/2021
$5,000,000.00 $4,988,750.00 $4,988,750.00 0.75% 1.359

1.350
$95.96
$4,797,865.00
($190,885.00) 2.32% Aaa
AA+
14913R2Q9 Caterpillar Financial
Services
Corporation 1.150%
09/14/2026
9/17/2021
9/21/2021
$2,500,000.00 $2,506,275.00 $2,506,275.00 1.10% 1.956

1.938
$94.99
$2,374,625.00
($131,650.00) 1.15% A2
A
037833CJ7 Apple Inc. 3.350%
02/09/2027
8/23/2024
8/26/2024
$1,500,000.00 $1,476,285.00
$2,372.92
$1,478,657.92 4.03% 2.362

2.277
$99.25
$1,488,735.00
$12,450.00 0.72% Aaa
AA+
24422EWD7 John Deere Capital
Corporation 2.350%
03/08/2027
3/8/2022
3/10/2022
$1,500,000.00 $1,497,345.00 $1,497,345.00 2.39% 2.436

2.380
$96.38
$1,445,715.00
($51,630.00) 0.70% A1
A
89236TJZ9 Toyota Motor Credit
Corporation 3.050%
03/22/2027
3/18/2022
3/22/2022
$1,750,000.00 $1,757,752.50 $1,757,752.50 2.95% 2.474 $98.19 $1,718,307.50
($39,445.00) 0.83% A1
A+
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 9 of 23 Town of Paradise Operating Account

POSITION STATEMENT
As of September 30, 2024
45 CUSIP Security
Description
Trade Date/
Settlement
Date
Par Value
Principal Cost/
Purchased
Interest
Total Cost Yield at
Cost
Maturity/
Duration
Market Price/
Market Value
Unrealized Gain/
(Loss)
% of
Assets
Moody's/
S&P
Rating
023135CF1 Amazon.com, Inc.

3.300% 04/13/2027
5/17/2022
5/19/2022
$2,000,000.00 $1,982,220.00 $1,982,220.00 3.50% 2.534

2.416
$98.92
$1,978,380.00
($3,840.00) 0.95% A1
AA
037833DB3 Apple Inc. 2.900%
09/12/2027
1/30/2023
2/1/2023
$1,000,000.00 $946,510.00 $946,510.00 4.19% 2.951

2.844
$98.00
$979,990.00
$33,480.00 0.47% Aaa
AA+
931142FB4 Walmart Inc. 3.900%
04/15/2028
9/17/2024
9/18/2024
$2,200,000.00 $2,219,096.00
$36,465.00
$2,255,561.00 3.64% 3.542

3.285
$100.64
$2,214,146.00
($4,950.00) 1.07% Aa2
AA
30303M8L9 Meta Platforms, Inc.

4.600% 05/15/2028
6/25/2024
6/26/2024
$3,000,000.00 $3,000,180.00
$15,716.67
$3,015,896.67 4.60% 3.625

3.329
$102.60
$3,078,015.00
$77,835.00 1.49% Aa3
AA89236TLN3 Toyota Motor Credit
Corporation 5.000%
01/22/2029
1/11/2024
1/22/2024
$2,100,000.00 $2,100,000.00 $2,100,000.00 5.00% 4.315

3.895
$99.70
$2,093,700.00
($6,300.00) 1.01% A1
A+
713448FX1 PepsiCo, Inc.

4.500% 07/17/2029
7/15/2024
7/17/2024
$1,180,000.00 $1,179,480.80 $1,179,480.80 4.51% 4.797

4.339
$103.02
$1,215,588.80
$36,108.00 0.59% A1
A+
SubTotal $25,730,000.00 $25,655,914.30
$54,554.59
$25,710,468.89 3.03% $25,375,187.30 ($280,727.00) 12.24% Corporate Note
742718FZ7 Procter & Gamble
Company, The

3.950% 01/26/2028
8/29/2024
8/30/2024
$1,985,000.00 $1,984,206.00
$7,405.15
$1,991,611.15 3.96% 3.323

3.126
$100.83
$2,001,455.65
$17,249.65 0.97% Aa3
AASubTotal $1,985,000.00 $1,984,206.00
$7,405.15
$1,991,611.15 3.96% $2,001,455.65 $17,249.65 0.97%
Mortgage-backed Security (Commercial)
3137FQK77 Federal Home Loan
Mortgage
Corporation 2.512%
10/25/2026
8/29/2024
9/4/2024
$2,470,589.63 $2,387,110.72 $2,387,110.72 4.90% 2.068

1.407
$97.45
$2,407,535.36
$20,424.64 1.16% Aaa
AA+
3137FKUN4 Federal Home Loan
Mortgage
Corporation 3.591%
10/25/2027
9/16/2024
9/19/2024
$1,700,425.62 $1,685,746.16 $1,685,746.16 4.13% 3.068

2.172
$99.13
$1,685,585.93
($160.23) 0.81% Aaa
AA+
3140LLEB3 Federal National
Mortgage
Association, Inc.

4.390% 07/01/2028
8/15/2023
8/18/2023
$1,250,000.00 $1,222,656.25 $1,222,656.25 4.94% 3.753

1.977
$101.40
$1,267,506.25
$44,850.00 0.61% Aaa
AA+
3132XFRD2 Federal Home Loan
Mortgage
Corporation 4.200%
07/01/2029
9/9/2024
9/12/2024
$2,450,000.00 $2,486,462.89 $2,486,462.89 3.89% 4.753

2.466
$100.95
$2,473,358.30
($13,104.59) 1.19% Aaa
AA+
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 10 of 23 Town of Paradise Operating Account

POSITION STATEMENT
As of September 30, 2024
46 CUSIP Security
Description
Trade Date/
Settlement
Date
Par Value
Principal Cost/
Purchased
Interest
Total Cost Yield at
Cost
Maturity/
Duration
Market Price/
Market Value
Unrealized Gain/
(Loss)
% of
Assets
Moody's/
S&P
Rating
3137HFF59 Federal Home Loan
Mortgage
Corporation 4.618%
07/25/2029
8/13/2024
8/22/2024
$3,000,000.00 $3,052,422.00 $3,052,422.00 4.19% 4.819

2.462
$102.69
$3,080,835.00
$28,413.00 1.49% Aaa
AA+
SubTotal $10,871,015.25 $10,834,398.02 $10,834,398.02 4.36% $10,914,820.84 $80,422.82 5.27% Municipal Bond
797299MM3 San Diego, City of

1.450% 10/15/2024
4/12/2021
4/14/2021
$900,000.00 $921,672.00 $921,672.00 0.75% 0.041

0.042
$99.85
$898,610.40
($23,061.60) 0.43%
AA79771FFP7 San Francisco, City
& County of 0.723%
11/01/2024
8/24/2023
8/24/2023
$1,305,000.00 $1,322,447.85 $1,322,447.85 0.76% 0.088

0.086
$99.65
$1,300,488.62
($21,959.23) 0.63%
AA79771FFM4 San Francisco, City
& County of 0.723%
11/01/2024
8/24/2023
8/24/2023
$150,000.00 $152,005.50 $152,005.50 0.76% 0.088

0.086
$99.62
$149,429.10
($2,576.40) 0.07%
NR
649791RA0 New York, State of

0.910% 03/15/2025
4/19/2021
4/21/2021
$1,000,000.00 $1,007,440.00 $1,007,440.00 0.72% 0.455

0.458
$98.41
$984,128.00
($23,312.00) 0.47% Aa1
AA+
13063DGB8 California, State of

3.375% 04/01/2025
12/23/2020
12/28/2020
$475,000.00 $531,610.50 $531,610.50 0.54% 0.501

0.494
$99.44
$472,360.90
($59,249.60) 0.23% Aa2
AA68609TWD6 Oregon, State of

0.895% 05/01/2025
12/8/2020
12/10/2020
$1,750,000.00 $1,780,887.50 $1,780,887.50 0.49% 0.584

0.584
$98.03
$1,715,451.50
($65,436.00) 0.83% Aa1
AA+
797412DM2 San Diego County
Water Authority

0.743% 05/01/2025
11/24/2020
11/27/2020
$1,075,000.00 $1,081,987.50 $1,081,987.50 0.59% 0.584

0.584
$97.87
$1,052,083.15
($29,904.35) 0.51% Aa2
AAA
91412HGE7 Regents of the
University of
California, The

0.883% 05/15/2025
12/15/2020
12/17/2020
$1,425,000.00 $1,442,199.75 $1,442,199.75 0.61% 0.622

0.623
$97.81
$1,393,802.48
($48,397.27) 0.67% Aa2
AA
91412HGE7 Regents of the
University of
California, The

0.883% 05/15/2025
12/21/2020
12/23/2020
$1,355,000.00 $1,372,736.95 $1,372,736.95 0.58% 0.622

0.623
$97.81
$1,325,334.99
($47,401.96) 0.64% Aa2
AA
91412HGE7 Regents of the
University of
California, The

0.883% 05/15/2025
1/20/2021
1/22/2021
$3,000,000.00 $3,047,880.00 $3,047,880.00 0.51% 0.622

0.623
$97.81
$2,934,321.00
($113,559.00) 1.42% Aa2
AA
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 11 of 23 Town of Paradise Operating Account

POSITION STATEMENT
As of September 30, 2024
47 CUSIP Security
Description
Trade Date/
Settlement
Date
Par Value
Principal Cost/
Purchased
Interest
Total Cost Yield at
Cost
Maturity/
Duration
Market Price/
Market Value
Unrealized Gain/
(Loss)
% of
Assets
Moody's/
S&P
Rating
79773KBG8 San Francisco, City
& County of 0.766%
06/15/2025
11/20/2020
12/8/2020
$200,000.00 $200,000.00 $200,000.00 0.77% 0.707

0.706
$97.50
$194,993.40
($5,006.60) 0.09% Aaa
AAA
56781RJJ7 Marin Community
College District

5.000% 08/01/2025
11/25/2020
11/30/2020
$2,280,000.00 $2,742,270.00 $2,742,270.00 0.59% 0.836

0.824
$100.46
$2,290,542.72
($451,727.28) 1.11% Aaa
AAA
969268DG3 William S. Hart
Union High School
District 0.757%
08/01/2025
12/10/2020
12/23/2020
$1,000,000.00 $1,000,000.00 $1,000,000.00 0.76% 0.836

0.834
$97.14
$971,372.00
($28,628.00) 0.47% Aa2
574193TR9 Maryland, State of

0.660% 08/01/2025
11/18/2020
11/20/2020
$3,000,000.00 $3,014,580.00 $3,014,580.00 0.56% 0.836

0.834
$97.14
$2,914,059.00
($100,521.00) 1.41% Aaa
AAA
482124SP0 Jurupa Unified
School District

1.059% 08/01/2025
5/27/2021
6/1/2021
$500,000.00 $504,265.00 $504,265.00 0.85% 0.836

0.833
$97.39
$486,930.50
($17,334.50) 0.23% Aa3
798186N81 San Jose Unified
School District

0.558% 08/01/2025
1/8/2021
1/20/2021
$1,000,000.00 $1,000,000.00 $1,000,000.00 0.56% 0.836

0.835
$97.05
$970,538.00
($29,462.00) 0.47% Aaa
AA+
206849GN5 Conejo Valley
Unified School
District 0.974%
08/01/2025
9/1/2021
9/22/2021
$205,000.00 $205,000.00 $205,000.00 0.97% 0.836

0.834
$97.32
$199,500.06
($5,499.94) 0.10% Aa3
03667PHE5 Antelope Valley
Community College
District 0.866%
08/01/2025
8/11/2021
8/31/2021
$170,000.00 $170,000.00 $170,000.00 0.87% 0.836

0.834
$97.20
$165,235.07
($4,764.93) 0.08% Aa2
AA
802649TJ2 Santa Rosa, City of

0.977% 09/01/2025
11/24/2020
12/1/2020
$1,530,000.00 $1,554,357.60 $1,554,357.60 0.64% 0.921

0.917
$97.11
$1,485,753.93
($68,603.67) 0.72%
AA
50420BDE9 La Quinta, City Of

1.168% 09/01/2025
4/8/2021
4/14/2021
$2,000,000.00 $2,022,960.00 $2,022,960.00 0.90% 0.921

0.916
$97.31
$1,946,228.00
($76,732.00) 0.94%
AA419792ZL3 Hawaii, State of

0.852% 10/01/2025
11/19/2020
11/23/2020
$5,000,000.00 $5,052,250.00 $5,052,250.00 0.63% 1.003

0.996
$96.87
$4,843,520.00
($208,730.00) 2.34% Aa2
AA+
13034AL65 California
Infrastructure and
Economic
Development Bank

0.765% 10/01/2025
12/8/2020
12/17/2020
$1,000,000.00 $1,007,250.00 $1,007,250.00 0.61% 1.003

0.997
$96.75
$967,533.00
($39,717.00) 0.47%
AAA
21969AAE2 Corona, City of

1.361% 05/01/2026
9/30/2021
10/14/2021
$860,000.00 $860,000.00 $860,000.00 1.36% 1.584

1.565
$96.03
$825,859.72
($34,140.28) 0.40%
AA+
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 12 of 23 Town of Paradise Operating Account

POSITION STATEMENT
As of September 30, 2024
48 CUSIP Security
Description
Trade Date/
Settlement
Date
Par Value
Principal Cost/
Purchased
Interest
Total Cost Yield at
Cost
Maturity/
Duration
Market Price/
Market Value
Unrealized Gain/
(Loss)
% of
Assets
Moody's/
S&P
Rating
21969AAE2 Corona, City of

1.361% 05/01/2026
10/5/2021
10/14/2021
$1,065,000.00 $1,071,336.75 $1,071,336.75 1.23% 1.584

1.565
$96.03
$1,022,721.63
($48,615.12) 0.49%
AA+
20772KNX3 Connecticut, State of

1.123% 06/01/2026
6/4/2021
6/9/2021
$2,200,000.00 $2,213,090.00 $2,213,090.00 1.00% 1.668

1.652
$95.44
$2,099,715.20
($113,374.80) 1.01% Aa3
AA80182AAE9 Santa Cruz, County
of 1.024%
06/01/2026
9/21/2021
9/23/2021
$1,060,000.00 $1,060,763.20 $1,060,763.20 1.01% 1.668

1.654
$94.74
$1,004,224.92
($56,538.28) 0.48%
AAA
80182AAE9 Santa Cruz, County
of 1.024%
06/01/2026
9/28/2021
9/30/2021
$1,075,000.00 $1,071,237.50 $1,071,237.50 1.10% 1.668

1.654
$94.74
$1,018,435.65
($52,801.85) 0.49%
AAA
20056XAC2 Commerce, City of

1.212% 08/01/2026
8/25/2021
8/31/2021
$525,000.00 $525,000.00 $525,000.00 1.21% 1.836

1.818
$95.18
$499,717.58
($25,282.42) 0.24%
AA696735QQ5 Palmdale School
District 1.071%
08/01/2026
8/6/2021
9/2/2021
$250,000.00 $250,000.00 $250,000.00 1.07% 1.836

1.820
$95.08
$237,692.75
($12,307.25) 0.11% Aa3
13063DC48 California, State of

1.700% 02/01/2028
1/25/2023
2/1/2023
$900,000.00 $805,545.00 $805,545.00 4.04% 3.340

3.245
$93.72
$843,485.40
$37,940.40 0.41% Aa2
AASubTotal $38,255,000.00 $38,990,772.60 $38,990,772.60 0.80% $37,214,068.67 ($1,776,703.93) 17.96% Municipal Note
91412HJL8 Regents of the
University of
California, The

0.670% 05/15/2025
2/24/2021
3/10/2021
$1,500,000.00 $1,500,000.00 $1,500,000.00 0.67% 0.622

0.623
$97.69
$1,465,305.00
($34,695.00) 0.71% Aa2
AA
SubTotal $1,500,000.00 $1,500,000.00 $1,500,000.00 0.67% $1,465,305.00 ($34,695.00) 0.71% Negotiable Certificate of Deposit
05580AE67 BMW Bank of North
America 0.650%
10/08/2024
9/30/2021
10/8/2021
$249,000.00 $248,315.25 $248,315.25 0.74% 0.022

0.022
$99.91
$248,773.41
$458.16 0.12%
7954507A7 Sallie Mae Bank

1.000% 07/14/2026
7/14/2021
7/16/2021
$248,000.00 $246,760.00 $246,760.00 1.10% 1.786

1.771
$93.02
$230,677.20
($16,082.80) 0.11%
38149MZJ5 Goldman Sachs
Bank USA Holdings
LLC 1.050%
09/08/2026
8/31/2021
9/8/2021
$249,000.00 $247,879.50 $247,879.50 1.14% 1.940

1.924
$95.05
$236,684.46
($11,195.04) 0.11%
SubTotal $746,000.00 $742,954.75 $742,954.75 0.99% $716,135.07 ($26,819.68) 0.35% 6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 13 of 23 Town of Paradise Operating Account

POSITION STATEMENT
As of September 30, 2024
49 CUSIP Security
Description
Trade Date/
Settlement
Date
Par Value
Principal Cost/
Purchased
Interest
Total Cost Yield at
Cost
Maturity/
Duration
Market Price/
Market Value
Unrealized Gain/
(Loss)
% of
Assets
Moody's/
S&P
Rating
Supranational
459058JA2 IBRD 0.750%
03/11/2025
3/4/2021
3/9/2021
$3,150,000.00 $3,167,671.50 $3,167,671.50 0.61% 0.444

0.447
$98.38
$3,099,033.00
($68,638.50) 1.50% Aaa
AA+
459058JL8 IBRD 0.500%
10/28/2025
2/3/2021
2/8/2021
$5,000,000.00 $4,994,200.00 $4,994,200.00 0.52% 1.077

1.074
$96.38
$4,819,200.00
($175,000.00) 2.33% Aaa
AA+
459058JS3 IBRD 0.650%
02/10/2026
5/27/2021
6/1/2021
$2,000,000.00 $1,981,720.00 $1,981,720.00 0.85% 1.364

1.356
$94.95
$1,898,940.00
($82,780.00) 0.92% Aaa
AA+
45950VPU4 IFC 0.75%
03/23/2026
3/4/2021
3/23/2021
$2,000,000.00 $1,994,880.00 $1,994,880.00 0.80% 1.477

1.475
$94.91
$1,898,180.00
($96,700.00) 0.92% Aaa
AA+
4581X0EN4 IADB 4.125%
02/15/2029
2/16/2024
2/21/2024
$3,310,000.00 $3,273,358.30 $3,273,358.30 4.37% 4.381

4.033
$102.19
$3,382,489.00
$109,130.70 1.63% Aaa
AA+
SubTotal $15,460,000.00 $15,411,829.80 $15,411,829.80 1.48% $15,097,842.00 ($313,987.80) 7.29% U.S. Treasury Bond
91282CCW9 UST 0.750%
08/31/2026
9/23/2021
9/24/2021
$2,500,000.00 $2,481,054.69 $2,481,054.69 0.91% 1.918

1.870
$94.78
$2,369,585.00
($111,469.69) 1.14% Aaa
AA+
SubTotal $2,500,000.00 $2,481,054.69 $2,481,054.69 0.91% $2,369,585.00 ($111,469.69) 1.14% U.S. Treasury Note
91282CCP4 UST 0.625%
07/31/2026
9/23/2021
9/24/2021
$2,500,000.00 $2,462,792.97 $2,462,792.97 0.94% 1.833

1.825
$94.76
$2,369,042.50
($93,750.47) 1.14% Aaa
AA+
91282CCZ2 UST 0.875%
09/30/2026
9/28/2021
9/30/2021
$2,950,000.00 $2,930,525.39 $2,930,525.39 1.01% 2.000

1.949
$94.86
$2,798,254.95
($132,270.44) 1.35% Aaa
AA+
912828X88 UST 2.375%
05/15/2027
11/10/2023
11/13/2023
$2,900,000.00 $2,679,214.84 $2,679,214.84 4.76% 2.622

2.537
$97.11
$2,816,245.10
$137,030.26 1.36% Aaa
AA+
91282CEW7 UST 3.250%
06/30/2027
8/21/2023
8/22/2023
$2,500,000.00 $2,383,886.72 $2,383,886.72 4.58% 2.748

2.632
$99.36
$2,483,985.00
$100,098.28 1.20% Aaa
AA+
91282CFH9 UST 3.125%
08/31/2027
11/22/2023
11/24/2023
$2,300,000.00 $2,187,785.16 $2,187,785.16 4.55% 2.918

2.803
$98.96
$2,276,008.70
$88,223.54 1.10% Aaa
AA+
91282CFM8 UST 4.125%
09/30/2027
3/3/2023
3/6/2023
$950,000.00 $941,835.94 $941,835.94 4.33% 3.000

2.854
$101.81
$967,198.80
$25,362.86 0.47% Aaa
AA+
91282CFZ9 UST 3.875%
11/30/2027
5/9/2024
5/10/2024
$2,800,000.00 $2,735,796.88 $2,735,796.88 4.58% 3.167

2.975
$101.11
$2,830,948.40
$95,151.52 1.37% Aaa
AA+
91282CGP0 UST 4.000%
02/29/2028
2/23/2023
3/1/2023
$1,175,000.00 $1,165,866.21 $1,165,866.21 4.17% 3.416

3.220
$101.60
$1,193,785.90
$27,919.69 0.58% Aaa
AA+
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 14 of 23 Town of Paradise Operating Account

POSITION STATEMENT
As of September 30, 2024
50 CUSIP Security
Description
Trade Date/
Settlement
Date
Par Value
Principal Cost/
Purchased
Interest
Total Cost Yield at
Cost
Maturity/
Duration
Market Price/
Market Value
Unrealized Gain/
(Loss)
% of
Assets
Moody's/
S&P
Rating
91282CGP0 UST 4.000%
02/29/2028
8/21/2023
8/22/2023
$1,050,000.00 $1,028,548.83 $1,028,548.83 4.50% 3.416

3.220
$101.60
$1,066,787.40
$38,238.57 0.51% Aaa
AA+
9128284N7 UST 2.875%
05/15/2028
5/15/2023
5/16/2023
$2,200,000.00 $2,137,609.38 $2,137,609.38 3.50% 3.625 $97.79 $2,151,395.40
$13,786.02 1.04% Aaa
AA+
91282CHK0 UST 4.000%
06/30/2028
8/21/2023
8/22/2023
$2,500,000.00 $2,448,242.19 $2,448,242.19 4.48% 3.751

3.489
$101.74
$2,543,555.00
$95,312.81 1.23% Aaa
AA+
91282CHQ7 UST 4.125%
07/31/2028
8/21/2023
8/22/2023
$2,500,000.00 $2,463,964.84 $2,463,964.84 4.45% 3.836

3.566
$102.20
$2,555,022.50
$91,057.66 1.23% Aaa
AA+
91282CHX2 UST 4.375%
08/31/2028
9/27/2023
9/28/2023
$2,050,000.00 $2,027,818.36 $2,027,818.36 4.62% 3.921

3.635
$103.15
$2,114,542.20
$86,723.84 1.02% Aaa
AA+
91282CJA0 UST 4.625%
09/30/2028
4/18/2024
4/19/2024
$2,525,000.00 $2,519,377.93 $2,519,377.93 4.68% 4.003

3.705
$104.15
$2,629,747.10
$110,369.17 1.27% Aaa
AA+
91282CJR3 UST 3.750%
12/31/2028
1/16/2024
1/17/2024
$2,000,000.00 $1,983,750.00 $1,983,750.00 3.93% 4.255

3.934
$100.94
$2,018,750.00
$35,000.00 0.97% Aaa
AA+
91282CKG5 UST 4.125%
03/31/2029
5/9/2024
5/10/2024
$2,500,000.00 $2,460,742.19 $2,460,742.19 4.49% 4.501

4.084
$102.55
$2,563,672.50
$102,930.31 1.24% Aaa
AA+
91282CEV9 UST 3.250%
06/30/2029
8/20/2024
8/21/2024
$2,700,000.00 $2,643,257.81
$12,399.46
$2,655,657.27 3.73% 4.751

4.402
$98.81
$2,667,937.50
$24,679.69 1.29% Aaa
AA+
SubTotal $38,100,000.00 $37,201,015.64
$12,399.46
$37,213,415.10 3.91% $38,046,878.95 $845,863.31 18.36%
Grand Total $210,615,086.63 $209,594,131.68
$77,093.58
$209,671,225.26 2.60% $207,244,662.86 ($2,349,468.82) 100.00% 6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 15 of 23 Town of Paradise Operating Account

POSITION STATEMENT
As of September 30, 2024
51 Transaction
Type Trade Date Settlement Date CUSIP Security Description Par Value Principal Amount Purchased Interest Total Cost Yield at Cost Purchase
Purchase 7/15/2024 7/17/2024 713448FX1 PepsiCo, Inc. 4.500% 07/17/2029
1,180,000.00 1,179,480.80 1,179,480.80 4.51%
Purchase 8/20/2024 8/21/2024 91282CEV9 UST 3.250% 06/30/2029 2,700,000.00 2,643,257.81 12,399.46 2,655,657.27 3.73% Purchase 8/13/2024 8/22/2024 3137HFF59 Federal Home Loan Mortgage Corporation

4.618% 07/25/2029
3,000,000.00 3,052,422.00 8,081.50 3,060,503.50 4.19%
Purchase 8/23/2024 8/26/2024 037833CJ7 Apple Inc. 3.350% 02/09/2027
1,500,000.00 1,476,285.00 2,372.92 1,478,657.92 4.03%
Purchase 8/29/2024 8/30/2024 742718FZ7 Procter & Gamble Company, The 3.950%
01/26/2028
1,985,000.00 1,984,206.00 7,405.15 1,991,611.15 3.96%
Purchase 8/29/2024 9/4/2024 3137FQK77 Federal Home Loan Mortgage Corporation

2.512% 10/25/2026
2,470,589.63 2,387,110.72 517.18 2,387,627.90 4.90%
Purchase 9/9/2024 9/12/2024 3132XFRD2 Federal Home Loan Mortgage Corporation

4.200% 07/01/2029
2,450,000.00 2,486,462.89 3,144.17 2,489,607.06 3.89%
Purchase 9/17/2024 9/18/2024 931142FB4 Walmart Inc. 3.900% 04/15/2028
2,200,000.00 2,219,096.00 36,465.00 2,255,561.00 3.64%
Purchase 9/16/2024 9/19/2024 3137FKUN4 Federal Home Loan Mortgage Corporation

3.591% 10/25/2027
1,700,425.62 1,685,746.16 3,053.11 1,688,799.27 4.13%
Total 19,186,015.25 19,114,067.38 73,438.49 19,187,505.87 Transaction
Type Trade Date Settlement Date CUSIP Security Description Par Value Principal Cost Total Proceeds Realized Gain/Loss Maturity
Maturity 7/1/2024 7/1/2024 119174AC4 Buena Park, City of 0.595% 07/01/2024 1,000,000.00 1,000,000.00 1,000,000.00 0.00 Maturity 8/1/2024 8/1/2024 969268DF5 William S. Hart Union High School District

0.607% 08/01/2024
2,250,000.00 2,250,000.00 2,250,000.00 0.00
Maturity 8/1/2024 8/1/2024 798186N73 San Jose Unified School District 0.383% 08/01/2024
535,000.00 535,000.00 535,000.00 0.00
Maturity 8/1/2024 8/1/2024 482124SN5 Jurupa Unified School District 0.625% 08/01/2024
500,000.00 500,000.00 500,000.00 0.00
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 16 of 23 Town of Paradise Operating Account

TRANSACTION STATEMENT
As of September 30, 2024
52 Transaction
Type Trade Date Settlement Date CUSIP Security Description Par Value Principal Cost Total Proceeds Realized Gain/Loss Maturity 8/1/2024 8/1/2024 03667PHD7 Antelope Valley Community College District 0.545% 08/01/2024
225,000.00 225,000.00 225,000.00 0.00
Maturity 8/1/2024 8/1/2024 20056XAA6 Commerce, City of 0.667% 08/01/2024 525,000.00 525,000.00 525,000.00 0.00 Maturity 8/1/2024 8/1/2024 206849GM7 Conejo Valley Unified School District

0.702% 08/01/2024
200,000.00 200,000.00 200,000.00 0.00
Maturity 8/1/2024 8/1/2024 223047AC5 Covina, City of 0.738% 08/01/2024 1,000,000.00 999,490.00 1,000,000.00 510.00 Maturity 8/1/2024 8/1/2024 155105NM7 Central School District School Facilities Corporation 1.022% 08/01/2024
140,000.00 140,000.00 140,000.00 0.00
Maturity 8/30/2024 8/30/2024 13607EHW2 Canadian Imperial Holdings Inc. 08/30/2024
1,510,000.00 1,451,423.33 1,510,000.00 58,576.67
Maturity 9/1/2024 9/1/2024 802649TH6 Santa Rosa, City of 0.827% 09/01/2024 1,000,000.00 1,010,410.00 1,000,000.00 (10,410.00) Maturity 9/1/2024 9/1/2024 21976THG0 Corona-Norco Unified School District

0.667% 09/01/2024
2,480,000.00 2,480,000.00 2,480,000.00 0.00
Maturity 9/1/2024 9/1/2024 626905PP2 Murrieta Valley Unified School District

0.698% 09/01/2024
500,000.00 500,000.00 500,000.00 0.00
Maturity 9/3/2024 9/3/2024 87165HC32 Synchrony Bank 0.550% 09/03/2024 249,000.00 248,253.00 249,000.00 747.00 Maturity 9/9/2024 9/9/2024 89235MLN9 Toyota Financial Savings Bank 0.650% 09/09/2024
249,000.00 248,377.50 249,000.00 622.50
Maturity 9/10/2024 9/10/2024 649447VM8 Flagstar Bank, National Association.

0.650% 09/10/2024
249,000.00 248,564.25 249,000.00 435.75
Maturity 9/13/2024 9/13/2024 14913R2P1 Caterpillar Financial Services Corporation

0.600% 09/13/2024
900,000.00 900,391.20 900,000.00 (391.20)
Total 13,512,000.00 13,461,909.28 13,512,000.00 50,090.72 Sell
Sell 8/26/2024 8/26/2024 3130AKQF6 FHLB 0.400% 01/27/2025 2,500,000.00 2,499,250.00 2,452,764.88 (46,485.12) Sell 8/29/2024 8/30/2024 91282CGH8 UST 3.500% 01/31/2028 2,000,000.00 1,960,156.25 1,984,296.88 24,140.63 6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 17 of 23 Town of Paradise Operating Account

TRANSACTION STATEMENT
As of September 30, 2024
53 Transaction
Type Trade Date Settlement Date CUSIP Security Description Par Value Principal Cost Total Proceeds Realized Gain/Loss Sell 8/16/2024 9/4/2024 546417DQ6 Louisiana, State of 0.840% 06/01/2025 400,000.00 401,512.00 390,672.00 (10,840.00) Total 4,900,000.00 4,860,918.25 4,827,733.76 (33,184.49) Transaction Type Payment Date Settlement Date CUSIP Security Description Interest Received Interest/Dividends
Interest/Dividends 7/1/2024 7/1/2024 119174AC4 Buena Park, City of 0.595% 07/01/2024 2,975.00 Interest/Dividends 7/1/2024 7/1/2024 3130AMWE8 FHLBANKS 1.00% 06/30/2028 10,000.00 Interest/Dividends 7/1/2024 7/1/2024 91282CJR3 UST 3.750% 12/31/2028 37,500.00 Interest/Dividends 7/1/2024 7/1/2024 91282CHK0 UST 4.000% 06/30/2028 50,000.00 Interest/Dividends 7/1/2024 7/1/2024 91282CEW7 UST 3.250% 06/30/2027 40,625.00 Interest/Dividends 7/1/2024 7/1/2024 3135G06Q1 FNMA 0.640% 12/30/2025 9,600.00 Interest/Dividends 7/1/2024 7/1/2024 31846V567 First American Funds, Inc. 7,115.18 Interest/Dividends 7/8/2024 7/8/2024 3134GXJQ8 FMCC 0.320% 01/06/2025 2,800.00 Interest/Dividends 7/12/2024 7/12/2024 3133EMMR0 FFCB 0.470% 01/12/2026 5,499.00 Interest/Dividends 7/15/2024 7/15/2024 31422B6K1 AGM 0.480% 01/15/2026 8,400.00 Interest/Dividends 7/15/2024 7/15/2024 742651DY5 PEFCO 1.400% 07/15/2028 20,475.00 Interest/Dividends 7/15/2024 7/15/2024 7954507A7 Sallie Mae Bank 1.000% 07/14/2026 1,236.60 Interest/Dividends 7/22/2024 7/22/2024 89236TLN3 Toyota Motor Credit Corporation 5.000% 01/22/2029 52,500.00 Interest/Dividends 7/25/2024 7/25/2024 3140LLEB3 Federal National Mortgage Association, Inc. 4.390% 07/01/2028
4,572.92
Interest/Dividends 7/29/2024 7/29/2024 3134GXKU7 FMCC 0.375% 01/29/2025 6,562.50 6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 18 of 23 Town of Paradise Operating Account

TRANSACTION STATEMENT
As of September 30, 2024
54 Transaction Type Payment Date Settlement Date CUSIP Security Description Interest Received Interest/Dividends 7/29/2024 7/29/2024 3135G06R9 FNMA 0.550% 01/28/2026 8,250.00 Interest/Dividends 7/29/2024 7/29/2024 3130AKQF6 FHLB 0.400% 01/27/2025 5,000.00 Interest/Dividends 7/31/2024 7/31/2024 91282CCP4 UST 0.625% 07/31/2026 7,812.50 Interest/Dividends 7/31/2024 7/31/2024 91282CGH8 UST 3.500% 01/31/2028 35,000.00 Interest/Dividends 7/31/2024 7/31/2024 91282CHQ7 UST 4.125% 07/31/2028 51,562.50 Interest/Dividends 8/1/2024 8/1/2024 13063DC48 California, State of 1.700% 02/01/2028 7,650.00 Interest/Dividends 8/1/2024 8/1/2024 155105NM7 Central School District School Facilities Corporation

1.022% 08/01/2024
715.40
Interest/Dividends 8/1/2024 8/1/2024 574193TR9 Maryland, State of 0.660% 08/01/2025 9,900.00 Interest/Dividends 8/1/2024 8/1/2024 56781RJJ7 Marin Community College District 5.000% 08/01/2025 57,000.00 Interest/Dividends 8/1/2024 8/1/2024 969268DF5 William S. Hart Union High School District 0.607% 08/01/2024
6,828.75
Interest/Dividends 8/1/2024 8/1/2024 969268DG3 William S. Hart Union High School District 0.757% 08/01/2025
3,785.00
Interest/Dividends 8/1/2024 8/1/2024 798186N73 San Jose Unified School District 0.383% 08/01/2024 1,024.53 Interest/Dividends 8/1/2024 8/1/2024 798186N81 San Jose Unified School District 0.558% 08/01/2025 2,790.00 Interest/Dividends 8/1/2024 8/1/2024 482124SN5 Jurupa Unified School District 0.625% 08/01/2024 1,562.50 Interest/Dividends 8/1/2024 8/1/2024 482124SP0 Jurupa Unified School District 1.059% 08/01/2025 2,647.50 Interest/Dividends 8/1/2024 8/1/2024 696735QQ5 Palmdale School District 1.071% 08/01/2026 1,338.75 Interest/Dividends 8/1/2024 8/1/2024 03667PHD7 Antelope Valley Community College District 0.545% 08/01/2024
613.13
Interest/Dividends 8/1/2024 8/1/2024 03667PHE5 Antelope Valley Community College District 0.866% 08/01/2025
736.10
Interest/Dividends 8/1/2024 8/1/2024 20056XAA6 Commerce, City of 0.667% 08/01/2024 1,750.88 6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 19 of 23 Town of Paradise Operating Account

TRANSACTION STATEMENT
As of September 30, 2024
55 Transaction Type Payment Date Settlement Date CUSIP Security Description Interest Received Interest/Dividends 8/1/2024 8/1/2024 20056XAC2 Commerce, City of 1.212% 08/01/2026 3,181.50 Interest/Dividends 8/1/2024 8/1/2024 206849GN5 Conejo Valley Unified School District 0.974% 08/01/2025 998.35 Interest/Dividends 8/1/2024 8/1/2024 206849GM7 Conejo Valley Unified School District 0.702% 08/01/2024 702.00 Interest/Dividends 8/1/2024 8/1/2024 223047AC5 Covina, City of 0.738% 08/01/2024 3,690.00 Interest/Dividends 8/1/2024 8/1/2024 31846V567 First American Funds, Inc. 2,837.15 Interest/Dividends 8/8/2024 8/8/2024 037833EB2 Apple Inc. 0.700% 02/08/2026 17,500.00 Interest/Dividends 8/12/2024 8/12/2024 69371RR99 PACCAR Financial Corp. 3.550% 08/11/2025 35,500.00 Interest/Dividends 8/12/2024 8/12/2024 459058JS3 IBRD 0.650% 02/10/2026 6,500.00 Interest/Dividends 8/15/2024 8/15/2024 4581X0EN4 IADB 4.125% 02/15/2029 73,957.81 Interest/Dividends 8/26/2024 8/26/2024 3140LLEB3 Federal National Mortgage Association, Inc. 4.390% 07/01/2028
4,725.35
Interest/Dividends 8/26/2024 8/26/2024 3130AKQF6 Federal Home Loan Bank of New York 0.40% 01/27/2025 805.56 Interest/Dividends 8/28/2024 8/28/2024 3133EP4A0 FFCB 4.250% 02/28/2029 21,250.00 Interest/Dividends 8/29/2024 8/30/2024 91282CGH8 Treasury, United States Department of 3.50% 01/31/2028 5,706.52 Interest/Dividends 9/3/2024 9/3/2024 802649TH6 Santa Rosa, City of 0.827% 09/01/2024 4,135.00 Interest/Dividends 9/3/2024 9/3/2024 802649TJ2 Santa Rosa, City of 0.977% 09/01/2025 7,474.05 Interest/Dividends 9/3/2024 9/3/2024 50420BDE9 La Quinta, City Of 1.168% 09/01/2025 11,680.00 Interest/Dividends 9/3/2024 9/3/2024 21976THG0 Corona-Norco Unified School District 0.667% 09/01/2024 8,270.80 Interest/Dividends 9/3/2024 9/3/2024 626905PP2 Murrieta Valley Unified School District 0.698% 09/01/2024 1,745.00 Interest/Dividends 9/3/2024 9/3/2024 91282CFH9 UST 3.125% 08/31/2027 35,937.50 6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 20 of 23 Town of Paradise Operating Account

TRANSACTION STATEMENT
As of September 30, 2024
56 Transaction Type Payment Date Settlement Date CUSIP Security Description Interest Received Interest/Dividends 9/3/2024 9/3/2024 91282CGP0 UST 4.000% 02/29/2028 44,500.00 Interest/Dividends 9/3/2024 9/3/2024 91282CHX2 UST 4.375% 08/31/2028 44,843.75 Interest/Dividends 9/3/2024 9/3/2024 91282CCW9 UST 0.750% 08/31/2026 9,375.00 Interest/Dividends 9/3/2024 9/3/2024 87165HC32 Synchrony Bank 0.550% 09/03/2024 690.38 Interest/Dividends 9/3/2024 9/3/2024 31846V567 First American Funds, Inc. 18,067.21 Interest/Dividends 8/16/2024 9/4/2024 546417DQ6 Louisiana, State of 0.84% 06/01/2025 868.00 Interest/Dividends 9/9/2024 9/9/2024 38149MZJ5 Goldman Sachs Bank USA Holdings LLC 1.050% 09/08/2026
1,317.99
Interest/Dividends 9/9/2024 9/9/2024 24422EWD7 John Deere Capital Corporation 2.350% 03/08/2027 17,625.00 Interest/Dividends 9/9/2024 9/9/2024 89235MLN9 Toyota Financial Savings Bank 0.650% 09/09/2024 815.90 Interest/Dividends 9/10/2024 9/10/2024 649447VM8 Flagstar Bank, National Association. 0.650% 09/10/2024 815.90 Interest/Dividends 9/11/2024 9/11/2024 459058JA2 IBRD 0.750% 03/11/2025 11,812.50 Interest/Dividends 9/12/2024 9/12/2024 037833DB3 Apple Inc. 2.900% 09/12/2027 14,500.00 Interest/Dividends 9/13/2024 9/13/2024 14913R2P1 Caterpillar Financial Services Corporation 0.600% 09/13/2024
2,700.00
Interest/Dividends 9/16/2024 9/16/2024 649791RA0 New York, State of 0.910% 03/15/2025 4,550.00 Interest/Dividends 9/16/2024 9/16/2024 880591EZ1 TVA 3.875% 03/15/2028 40,687.50 Interest/Dividends 9/16/2024 9/16/2024 14913R2Q9 Caterpillar Financial Services Corporation 1.150% 09/14/2026
14,375.00
Interest/Dividends 9/23/2024 9/23/2024 89236TJZ9 Toyota Motor Credit Corporation 3.050% 03/22/2027 26,687.50 Interest/Dividends 9/23/2024 9/23/2024 45950VPU4 IFC 0.75% 03/23/2026 7,500.00 Interest/Dividends 9/25/2024 9/25/2024 3140LLEB3 Federal National Mortgage Association, Inc. 4.390% 07/01/2028
4,725.35
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 21 of 23 Town of Paradise Operating Account

TRANSACTION STATEMENT
As of September 30, 2024
57 Transaction Type Payment Date Settlement Date CUSIP Security Description Interest Received Interest/Dividends 9/25/2024 9/25/2024 3137HFF59 Federal Home Loan Mortgage Corporation 4.618% 07/25/2029
11,545.00
Interest/Dividends 9/30/2024 9/30/2024 91282CKG5 UST 4.125% 03/31/2029 51,562.50 Interest/Dividends 9/30/2024 9/30/2024 91282CJA0 UST 4.625% 09/30/2028 58,390.63 Interest/Dividends 9/30/2024 9/30/2024 91282CFM8 UST 4.125% 09/30/2027 19,593.75 Interest/Dividends 9/30/2024 9/30/2024 91282CCZ2 UST 0.875% 09/30/2026 12,906.25 Total 1,132,880.44
Transaction Type Trade Date Settlement Date Transaction Description Amount Custodian Fee
Custodian Fee 7/25/2024 7/25/2024 Cash Out (1,485.16)
Custodian Fee 8/23/2024 8/23/2024 Cash Out (1,495.67)
Custodian Fee 9/25/2024 9/25/2024 Cash Out (1,135.68)
Total (4,116.51)
Management Fee
Management Fee 7/29/2024 7/29/2024 Cash Out (5,500.00)
Management Fee 8/21/2024 8/21/2024 Cash Out (5,500.00)
Management Fee 9/20/2024 9/20/2024 Cash Out (5,500.00)
Total (16,500.00)
6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 22 of 23 Town of Paradise Operating Account

TRANSACTION STATEMENT
As of September 30, 2024
58 Meeder provides monthly statements for its investment management clients to provide information about the investment portfolio. The information should not be used for audit or confirmation purposes. Please review your custodial statements and report any inaccuracies or discrepancies.

Certain information and data has been supplied by unaffiliated third parties. Although Meeder believes the information is reliable, it cannot warrant the accuracy of information offered by third parties. Market value may reflect prices received from pricing vendors when current market quotations are not available. Prices may not reflect firm bids or offers and may differ from the value at which the security can be sold.

Statements may include positions from unmanaged accounts provided for reporting purposes. Unmanaged accounts are managed directly by the client and are not included in the accounts managed by the investment adviser. This information is provided as a client convenience and the investment adviser assumes no responsibility for performance of these accounts or the accuracy of the data reported.

Investing involves risk. Past performance is no guarantee of future results. Debt and fixed income securities are subject to credit and interest rate risk. The investment return and principal value of an investment will fluctuate so that an investors shares, when redeemed, may be worth more or less than their original cost. Current performance may be lower or higher than the performance data quoted.

Meeder Investment Management is the global brand for the Meeder group of affiliated companies. Investment advisory services are provided through Meeder Public Funds, Inc. Please contact us if you would like to receive a copy of our current ADV disclosure brochure or privacy policy. 6125 Memorial Drive, Dublin Ohio 43017 | 866-633-3371 | www.meederpublicfunds.com Page 23 of 23 Town of Paradise Operating Account

STATEMENT DISCLOSURE
As of September 30, 2024
59 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 2(d)
ORIGINATED BY: Susan Hartman, Community Development Director – Planning & Wastewater
REVIEWED BY: Jim Goodwin, Town Manager
Scott Huber, Town Attorney
SUBJECT: Adoption of Town Ordinance No. 638

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Waive the second reading of Town Ordinance No. 638 and read by title only (roll call vote); and,

2. Adopt Town Ordinance No. 638 “An Ordinance Amending Text Regulations within Paradise Municipal Code Title 17 [Zoning] Relative to Electronic Changeable Message Sign Regulations.”
Background:

On October 8, 2024, the Town Council introduced the above-noted ordinance for purposes of eventual adoption. If adopted, the intent of the proposed ordinance is to allow for expanded use of electronic changeable message signs into the Community Commercial and Industrial Service zoning district subject to specific standards and prohibitions.

Analysis:

Town staff recommends that the Town Council waive the second reading of this entire ordinance; read it by title only; and formally adopt Town Ordinance No. 638 [copy attached]. Once adopted, the provisions of this ordinance will be effective thirty (30) days thereafter.

Financial Impact:

A nominal cost for publication of the ordinance within the local newspaper and for codification will be borne by the Town of Paradise.

Attachment:

1. Town of Paradise Ordinance No. 638 “An Ordinance Amending Text Regulations within Paradise Municipal Code Title 17 [Zoning] Relative to Electronic Changeable Message Sign Regulations”.
60 TOWN OF PARADISE
ORDINANCE NO. 638

AN ORDINANCE AMENDING TEXT REGULATIONS WITHIN
PARADISE MUNICIPAL CODE TITLE 17 [ZONING] RELATIVE TO ELECTRONIC CHANGEABLE

MESSAGE SIGN REGULATIONS
SECTION 1. The definition of the term “Sign, Electronic Changeable Message” in Paradise Municipal Code Chapter 17.04 shall be added to read as follows:

Sign, electronic changeable message. “Electronic changeable message sign” means a SIGN with a fixed or changing display composed of a series of lights, including LEDs and LCDs, that may be changed through electronic means, but not including time and temperature displays.

SECTION 2. Amend the excepted sign listings in Section 17.37.300.A [Prohibited Signs] to read:

The following signs are prohibited in all zones, except as specifically allowed or limited herein:

A. Animated signs, excepting the following specifically permitted types of animation:

1. Barber poles not exceeding three (3) feet in height nor projecting more than one foot from a building;

2. Electronic changeable message signs as permitted in Section 17.37.670.

SECTION 3. A new Section 17.37.670 shall be added to Paradise Municipal Code Chapter 17.37 [Sign Regulations] to read as follows:

Section 17.37.670 – Electronic changeable message signs.

A) Only permitted for public, quasi-public and community service land uses located upon property situated within the C-S or C-F zones and for non-residential land uses within the C-C and I-S zones.

B) A maximum of one electronic changeable message sign is permitted per site with a maximum electronic area of 40 square feet. New freestanding electronic changeable message signs shall have a maximum height of 6 feet.

C) Messages shall be static and unanimated for a minimum of 8 seconds.

D) Transition during messages shall be 2 seconds or less and shall either be instantaneous or fade in/out. Flashing is prohibited.
61 E) For signs in the C-C or I-S zones, adjacent to a residential zoning district or where an existing sign cabinet is proposed to be retrofitted and the existing sign exceeds the size and/or height limits for an electronic changeable message sign, a CONDITIONAL USE PERMIT will be required.

F) Electronic changeable message sign faces permitted after the effective date of the ordinance codified in this chapter shall be equipped with a photocell, timer, or other similar device which automatically dims the display during nighttime hours to prevent glare impacts.

G) Electronic changeable message signs permitted after the effective date of the ordinance codified in this chapter shall not be brighter than the illumination limit recommended by the International Sign Association (ISA) for Electronic Message Center signs, or 0.3 footcandles above ambient light when measured at the recommended distance as set forth by the ISA.

H) Electronic changeable message signs are not permitted to be installed as ROOF SIGNS or operate as BILLBOARDS.

SECTION 4. Amend the text in Section 17.37.600.A [Permitted signs (billboards)] to read:

17.37.600 Permitted signs (billboards).

A. Billboards may be permitted in the C-C, C-F, C-S and I-S zoning districts subject to town approval and issuance of an administrative permit in addition to the following limitations:

1. The sign face (poster panel) shall be limited to a display surface not to exceed one hundred (100) square feet.

2. Not more than one single-sided or double-sided billboard panel shall be located at any site.

3. Billboards shall not exceed sixteen (16) feet in height.

4. Billboards shall not be closer than fifty (50) feet from the centerline of a street unless the administrative permit provides for installation closer than fifty (50) feet.

5. Billboard sites shall be located at least five hundred (500) radial feet distance from any existing billboard of a size greater than one hundred (100) square feet; three hundred (300) radial feet from any other billboard. Separation distance requirements for benches displaying advertising other than those benches determined to be exempt from the provisions of this chapter shall be determined as a condition of an administrative permit approval, if required.

6. Billboards shall not be permitted to be established upon properties located within the town adopted "Downtown Revitalization Master Plan Area.

7. Billboards shall not be electronic changeable message signs. 62 SECTION 5. Amend the table in Section 17.37.700 [Business signs – Regulations in all zoning districts] to read:

Table 17.37.700
Regulations for Business Signs in All Districts
(The maximum allowable sizes and numbers are shown)
Type of Sign Zones Regulations
Roof signs R-C, AG-10, AG-20, AR-1, AR-3, AR-5, RR-1,
RR-2/3, RR-1/2, TR-1, TR-1/2, TR-1/3, M-F, NC, C-S, C-F Not permitted
C-B, C-C 1.0 square foot of sign area per linear foot of roof length; not above highest point of roof
or parapet; electronic changeable message
signs not permitted
I-S 1.0 square foot of sign area per linear foot of
roof length; not above highest point of roof
or parapet; electronic changeable message
signs not permitted
Projecting signs R-C, AG-10, AG-20, AR-1, AR-3, AR-5, RR-1, RR-2/3, RR-1/2, TR-1, TR-1/2, TR-1/3, M-F
Not permitted
C-S, C-F 16 square feet maximum; 5 feet from wall
N-C, C-B 16 square feet maximum; 5 feet from wall
C-C, I-S 32 square feet maximum; 5 feet from wall
Flush (wallmounted) signs R-C, AG-10, AG-20, AR-1, AR-3, AR-5, RR-1, RR-2/3, RR-1/2, TR-1, TR-1/2, TR-1/3
10% of the area of the building wall on which
the sign is established; 25 percent of wall
length
C-S, N-C, C-B, C-F 1.0 square foot of sign area per linear foot of wall length; 50 percent of wall length
C-C, I-S 1.5 square feet of sign area per linear foot of wall length; 50 percent of wall length
Freestanding
signs
R-C, AG-10, AG-20, AR-1, AR-3, AR-5, RR-1,
RR-2/3, RR-1/2, TR-1, TR-1/2, TR-1/3
Refer to identification signs section

17.37.400.G.

N-C, C-B, C-S, C-F, M-F 40 square feet; maximum 6 feet height; 1 per site
C-C, I-S (excepting scenic highway corridors) Monument, post or pole, 100 square feet, maximum height 10 feet (monument), and
16 feet (post, pole or pylon); 2 per site
Scenic highway corridors Monument or post, 100 square feet, maximum height 8 feet; 1 per site
SECTION6. CEQA COMPLIANCE. The Town Council finds and determines that the enactment of this Ordinance is exempt from the requirements of the California Environmental Quality Act (CEQA), pursuant to CEQA Guidelines section 15061(b)(3) (General Rule Exemption).

SECTION 7. This ordinance shall take effect thirty (30) days after the date of its passage. Before the expiration of fifteen (15) days after its passage, this ordinance or a summary thereof shall be 63 published in a newspaper of general circulation published and circulated within the Town of Paradise along with the names of the members of the Town Council of Paradise voting for and against same.

PASSED AND ADOPTED by the Town Council of the Town of Paradise, County of Butte, State of California, on this 12th day of November, 2024 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
__________________________________
Ronald Lassonde, Mayor
ATTEST:
___________________________________
Melanie Elvis, Town Clerk/Elections Official
APPROVED AS TO FORM:
________________________________
Scott E. Huber, Town Attorney
64 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 2(e)
ORIGINATED BY: Marc Mattox, Town Engineer
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Declaration of certain Town equipment to be surplus and obsolete

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Declare the attached described equipment as surplus property; and

2. Adopt Resolution No. 2024-___, “A Resolution of the Town Council of the Town of Paradise, Declaring Certain Town Equipment to be Surplus and Obsolete and Authorizing Disposal by the Town Manager or His Designee.” Background:

Over time, equipment purchased becomes obsolete. Vehicles and equipment listed below may be declared as unusable or outdated as they are no longer economical or effective to be used for Town purposes.

The vehicles/items listed below are well beyond their serviceable life. Maintenance costs are accumulating, and the cost of upkeep outweighs the benefit of having the vehicles. The vehicles have been replaced with a newer model, and the vehicle(s) is no longer able to maintain current emissions standards.

Financial Impact:

The disposal of these items will have no negative impact on the General Fund.

Property to Surplus:

1. PW12 1993 GMC DUMP TRUCK, VIN: 1GDP7H1J4PJ500162

2. PW34 1998 International BOOM TRUCK, VIN: 1HTSCABLWH515512

3. PW30 1981 CHAMPION GRADER, 12442

4. PD36 1994 International ARMORED TRUCK, VIN: 1HTSCACMXRH583943 65 TOWN OF PARADISE
RESOLUTION NO. 2024-__

A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF PARADISE

DECLARING CERTAIN TOWN PROPERTY TO BE SURPLUS AND

AUTHORIZING DISPOSAL THEREOF
WHEREAS, the Town of Paradise wishes to dispose of certain equipment from various departments through public auction, internet sale, salvage or other legal method that is no longer functional or necessary to the Town’s operations.

NOW, THEREFORE, BE IT RESOLVED by the Town Council of the Town of Paradise as follows:

Section 1. The following equipment is declared to be surplus:

1. PW12 1993 GMC DUMP TRUCK, VIN: 1GDP7H1J4PJ500162

2. PW34 1998 International BOOM TRUCK, VIN: 1HTSCABLWH515512

3. PW30 1981 CHAMPION GRADER, 12442

4. PD36 1994 International ARMORED TRUCK, VIN: 1HTSCACMXRH583943 Section 2. Pursuant to Paradise Municipal Code Section 2.45.130, the Town Manager is hereby authorized to dispose of the property set forth in Section 1 through public auction, internet, sale, salvage, donation or other legal method.

PASSED AND ADOPTED by the Town Council of the Town of Paradise on this 12 th day
of November, 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

By: ________________________________
Ronald Lassonde, Mayor
ATTEST:

Melanie Elvis, Town Clerk
APPROVED AS TO FORM:
______
Scott E. Huber, Town Attorney
66 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 5(a)
ORIGINATED BY: Tony Lindsey, Community Development Director – Building & Code Enforcement
REVIEWED BY: Jim Goodwin, Town Manager
Scott Huber, Town Attorney
SUBJECT: Weed Abatement Hearing of Objections

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Hold a public hearing to hear all objections to the proposed removal of vegetative growth or refuse and allow or overrule any objections; and,

2. Authorize staff to proceed and perform the abatement work as soon as possible; and,

3. Approve staff-recommended budget adjustment; or,

4. Provide alternative direction to Town staff. (ROLL CALL VOTE) Background:

At the October Council meeting, the Town Council adopted Resolution 2024-72, declaring vegetative growth and refuse as a public nuisance. This action allows for the abatement of privately owned parcels without the property owner's consent and facilitates the placement of all unrecovered assessment fees on the tax roll.

The Town Clerk mailed written notices of the proposed abatement to all affected property owners on Monday, October 14th. These notices provided a four-week notice period before the upcoming appeal hearing, scheduled for November 12th. Notices were sent to the addresses where the properties were assessed on the last equalized assessment roll and any alternative addresses that staff could obtain. This notification exceeded the minimum 14-day timeline to prepare objections for the Town Council meeting. Additionally, Code Enforcement and Fire Prevention Staff physically posted the same notices at each property subject to abatement, ensuring all affected parties were adequately informed.

At the October Council meeting, 396 properties were identified as having overgrown vegetation that posed a public nuisance. Since then, 155 properties have complied, decreasing the number of properties that require abatement operations and are eligible for appeal to 241.

As part of the abatement process, the Town Council must hear objections to the proposed removal of vegetative growth and refuse at this meeting. This hearing allows any affected property owner to object to the proposed abatement of hazards on their property. The Town Council will listen to and consider all objections and may accept or overrule them.

Analysis:
67 Section 8.04.135 of the Paradise Municipal Code, which deals with the abatement of vegetative growth or refuse that poses a hazard, is enforced through a systematic process starting with the adoption of a resolution. This marks the second step of the Implementation Plan and requires action by the Council.

Throughout the year, the Paradise Prevention Division conducts Defensible Space inspections of approximately 11,189 parcels within the Town. Notices are sent to the recorded owners of parcels identified as hazards. If mail is returned, staff consults county ownership records and utility provider information and employs people-finding software to contact unresponsive property owners. The Town Clerk’s Office maintains and makes available for public review a list of parcels identified as having problematic vegetative growth or refuse, designated as public nuisances, included as Exhibit A.

Compliance with the Weed Abatement Section of our Municipal Code is a critical component of our Fuel Management Plan. The Town of Paradise does not want to be in the mowing business.

This program intends to encourage citizens to independently manage the weeds on their properties. An efficient Fuel Management Program helps the Town keep wildland fires at a minimum.

After this November hearing, the Town Council gains the authority to carry out abatement work.

Properties identified for abatement will be publicly posted. Should unresolved fire hazards remain ten days following the hearing, the Town is empowered to eliminate these hazards. If the declared nuisance on a property has been addressed, that property will then be removed from the abatement list.

Staff recommends that abatement work on the non-compliant parcels begin as soon as possible due to the significant amount of overgrown vegetation. Completing the abatement for each parcel could take several days, potentially affecting our overall schedule. Furthermore, with the rainy season approaching, we anticipate potential weather delays, which could further impact the timely completion of abatement on these priority non-compliant parcels.

Financial Impact:

Cost of Abatement
The costs of the weed abatement program can potentially be recovered through the assessments charged to non-compliant parcels that a Contractor under the direction of Town staff is tasked with abating. Property owners who comply with the Municipal Code are not assessed or charged abatement costs.
241 parcels are out of compliance and meet the priority criterion (referenced in Exhibit A). Of these, 103 are currently in tax default status. With an estimated abatement cost of $1,600 per parcel, the total projected cost for this task is $401,600. This strategy targets these 241 noncompliant parcels to increase the compliance rate by 2%.

The remaining budget for weed abatement activities for the fiscal year 2024-2025 is $54,000. To fully cover the projected costs of $441,760 needed to manage the 241 priority non-compliant parcels, a budget adjustment of $387,760 from the General Fund is requested for the abatement account. This adjustment included a 10% contingency to address any unexpected costs related to the abatement of these parcels. Any unspent funds will be reverted to the general fund at the end of the fiscal year. The Town mitigates the costs of the abatement program by billing property owners for contractor fees and administrative expenses. These invoices encompass all applicable charges, with payments required within 45 days.
68 Potential Cost Recovery
Estimating the costs associated with abatement is straightforward, but our ability to recover these costs remains uncertain, posing significant challenges for financial planning and budgeting. It is reasonable to anticipate that some of these costs will be recovered, though not necessarily within the same fiscal year they are incurred. Implementing practical strategies and rigorous monitoring is crucial to navigate these uncertainties and ensure the program’s financial sustainability and success. The data collected from implementing this approach will provide more accurate estimates of our cost recovery capabilities each year.

Once the Town has completed abatement on properties, there are three primary options for cost recovery:

1. Payments:

Staff anticipates a certain percentage of property owners will pay the invoice for abatement upon receipt from the Town.

2. Property Tax Assessment Roll:

The abatement cost, excluding citations, can be included on the annual property tax bill, allowing it to be paid along with property tax payments in April and November each year.

To implement this, yearly assessments must be submitted to Butte County by August.

Depending on the timing of the abatement, recovering costs through this method could take up to a year, assuming the property owner makes timely payments. If the payment is not made, the property will be considered tax delinquent; see below. This approach is effective for property owners with a history of paying their property taxes on time, according to the provisions of section 29142 of the California Government Code. $0.30 per parcel fee will be charged for enrolling an item onto the tax roll.

3. Placing a Lien on the Property:

A lien placed on a property with a tax default status would cost $250 per parcel and take an estimated 60-84 months to recover at the point of tax default sale. According to the Town Attorney, the Town could accelerate this process by pursuing recovery through the courts.
a. Judicial foreclosure is a court-ordered process initiated by a lawsuit from the Town, leading to the property's auction, where proceeds repay the Town and other lien holders, with any surplus returned to the property owner. The estimated cost for this process is $7,500-$10,000, with an estimated 12 months to recover.

As previously mentioned, the data collected from our experience operating the program will improve our ability to project cost recovery accurately.

Attachment: Exhibit A Properties with overgrown vegetation posing a public nuisance. 69 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
050-012-005-000 9148 SKYWAY, PARADISE CA 95969
050-013-018-000 7237 PENTZ RD, PARADISE CA 95969
050-040-093-000* 1673 GINNY LN, PARADISE CA 95969
050-052-049-000 1667 MULBERRY LN, PARADISE CA 95969
050-052-073-000* 7091 PENTZ RD, PARADISE CA 95969
050-052-093-000* 7080 CLARK RD, PARADISE CA 95969
050-052-099-000 1663 SWEETBRIER LN, PARADISE CA 95969
050-052-102-000 1681 SWEETBRIER LN, PARADISE CA 95969
050-060-012-000 1433 COLDREN RD, PARADISE CA 95969
050-060-023-000 6848 QUAIL WAY, PARADISE CA 95969
050-060-040-000 1450 JUSTA RD, PARADISE CA 95969
050-060-087-000 0 QUAIL WAY, PARADISE CA 95969
050-081-039-000 1531 FOREST SERVICE RD, PARADISE CA 95969 050-081-042-000 6899 CLARK RD, PARADISE CA 95969
050-082-048-000* 1611 TIMBER LN, PARADISE CA 95969
050-082-083-000* 1640 TIMBER WALK WAY, PARADISE CA 95969 050-090-008-000* 1788 HONEYSUCKLE LN, PARADISE CA 95969 050-090-025-000* 1762 SPARKS DR, PARADISE CA 95969
050-090-036-000 1765 SPARKS DR, PARADISE CA 95969
050-100-029-000 1820 DRAYER DR, PARADISE CA 95969
050-100-078-000* 1779 SUNRISE LN, PARADISE CA 95969
050-100-083-000 1775 SUNRISE LN, PARADISE CA 95969
050-100-134-000* 1725 ARANY CT, PARADISE CA 95969
050-120-024-000 1924 DEAN RD, PARADISE CA 95969
050-120-096-000 6885 LUNAR LN, PARADISE CA 95969
70 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
050-120-121-000* 1871 DEAN RD, PARADISE CA 95969
050-120-134-000 1802 EL TORO CT, PARADISE CA 95969
050-120-145-000* 6890 PENTZ RD, PARADISE CA 95969
050-140-069-000 6849 CLARK RD, PARADISE CA 95969
050-150-007-000* 1337 TAYLOR LN, PARADISE CA 95969
050-150-021-000* 1456 MAYHEW LN, PARADISE CA 95969
050-150-074-000* 6526 HUMMINGBIRD LN, PARADISE CA 95969 050-210-017-000* 6250 FOREST LN, PARADISE CA 95969
050-210-028-000 1537 BILLE RD, PARADISE CA 95969
050-210-031-000* 1531 BILLE RD, PARADISE CA 95969
050-210-047-000 6294 VIRGINIA WAY, PARADISE CA 95969
050-220-010-000 1861 MERRILL RD, PARADISE CA 95969
050-220-075-000 6541 WHEELER RD, PARADISE CA 95969
050-230-010-000 6691 SHAY LN, PARADISE CA 95969
050-230-023-000 6678 SHAY LN, PARADISE CA 95969
050-230-035-000 1880 MERRILL RD, PARADISE CA 95969
050-230-043-000 1822 MERRILL RD, PARADISE CA 95969
050-240-018-000 1769 STARK LN, PARADISE CA 95969
050-240-072-000 1781 STARK LN, PARADISE CA 95969
050-250-065-000 6255 MOUNTAIN VIEW DR, PARADISE CA 95969 050-280-020-000 6262 LANCASTER DR, PARADISE CA 95969
050-330-038-000 6484 SIMON WAY, PARADISE CA 95969
050-330-047-000 6479 SIMON WAY, PARADISE CA 95969
050-330-049-000 6498 SIMON WAY, PARADISE CA 95969
050-330-055-000 6471 LONE CEDAR LN, PARADISE CA 95969
71 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
050-340-037-000 6420 MOSS LN, PARADISE CA 95969
050-340-038-000* 1345 WAGSTAFF RD, PARADISE CA 95969
050-340-061-000* 6433 MOSS LN #B, PARADISE CA 95969
050-350-039-000* 6455 RIX LN, PARADISE CA 95969
050-360-017-000 6452 RIX LN, PARADISE CA 95969
050-420-021-000* 1543 GATE LN, PARADISE CA 95969
050-450-002-000 1682 PARADISEWOOD DR, PARADISE CA 95969 051-040-070-000* 6731 WOODLAND DR, PARADISE CA 95969
051-040-075-000 6656 LINCOLN DR, PARADISE CA 95969
051-040-077-000 6785 WOODLAND DR, PARADISE CA 95969
051-050-026-000 777 WAGSTAFF RD, PARADISE CA 95969
051-050-087-000* 6539 LUCKY JOHN RD, PARADISE CA 95969
051-050-123-000 0 WAGSTAFF, PARADISE CA 95969
051-071-114-000 6312 W WAGSTAFF RD, PARADISE CA 95969
051-071-117-000* 542 ROBERTS RD, PARADISE CA 95969
051-071-122-000 6291 OLIVER RD, PARADISE CA 95969
051-072-048-000 6237 W WAGSTAFF RD, PARADISE CA 95969
051-072-068-000 6229 WAGSTAFF RD, PARADISE CA 95969
051-072-081-000 6379 OLIVER RD, PARADISE CA 95969
051-081-054-000* 6379 GRAHAM RD, PARADISE CA 95969
051-082-039-000* 6335 GRAHAM RD, PARADISE CA 95969
051-083-120-000* 6368 GRAHAM RD, PARADISE CA 95969
051-083-137-000 6360 GRAHAM RD, PARADISE CA 95969
051-091-107-000 750 MEYERS LN, PARADISE CA 95969
051-092-049-000* 6240 OLIVER RD, PARADISE CA 95969
72 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
051-102-032-000 8606 SKYWAY, PARADISE CA 95969
051-103-012-000* 8405 MONTNA DR, PARADISE CA 95969
051-104-046-000* 8412 MONTNA DR, PARADISE CA 95969
051-104-073-000 6611 QUAIL WAY, PARADISE CA 95969
051-104-139-000* 6598 FIRLAND DR, PARADISE CA 95969
051-104-149-000* 8605 STIRAS WAY, PARADISE CA 95969
051-104-151-000* 8619 STIRAS WAY, PARADISE CA 95969
051-120-004-000 919 WAGGONER RD, PARADISE CA 95969
051-120-046-000 0 LUCKY JOHN RD, PARADISE CA 95969
051-120-061-000* 6664 PARAGALIA WAY, PARADISE CA 95969
051-120-068-000* 983 WAGGONER RD, PARADISE CA 95969
051-120-069-000* 985 WAGGONER RD, PARADISE CA 95969
051-120-118-000 6720 MACHUGA LN, PARADISE CA 95969
051-120-131-000 879 WAGGONER RD, PARADISE CA 95969
051-120-135-000 6714 PARAGALIA WAY, PARADISE CA 95969
051-121-021-000 875 WAGSTAFF RD, PARADISE CA 95969
051-132-053-000 6417 ROCKY LN, PARADISE CA 95969
051-132-106-000* 6406 OAK WAY, PARADISE CA 95969
051-132-111-000 1250 SEVERNS LN, PARADISE CA 95969
051-132-116-000 6481 ROCKY LN, PARADISE CA 95969
051-142-008-000* 6367 BERKSHIRE WAY, PARADISE CA 95969
051-144-001-000* 6408 DIAMOND AVE, PARADISE CA 95969
051-144-009-000* 6345 OAK WAY, PARADISE CA 95969
051-144-033-000 1186 SOFT BREEZE LN, PARADISE CA 95969
051-145-017-000 6319 AZALEA LN, PARADISE CA 95969
73 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
051-145-044-000 6303 HARVEY RD, PARADISE CA 95969
051-146-023-000 6357 TABERNACLE LN, PARADISE CA 95969
051-146-048-000 6332 HARVEY RD, PARADISE CA 95969
051-151-021-000 8083 SKYWAY, PARADISE CA 95969
051-151-031-000 947 THOMASSON LN, PARADISE CA 95969
051-151-057-000 1074 WAGSTAFF RD, PARADISE CA 95969
051-151-071-000* 8095 SKYWAY, PARADISE CA 95969
051-152-030-000 888 THOMASSON LN, PARADISE CA 95969
051-161-019-000 6315 RUBY LN, PARADISE CA 95969
051-161-028-000 6366 LUCKY JOHN RD, PARADISE CA 95969
051-163-035-000 7785 SKYWAY, PARADISE CA 95969
051-164-047-000* 1071 BILLE RD, PARADISE CA 95969
051-171-058-000 6290 DIAMOND AVE, PARADISE CA 95969
051-171-081-000 6218 STINSON LN, PARADISE CA 95969
051-172-047-000* 6278 AZALEA LN, PARADISE CA 95969
051-172-051-000 6261 HARVEY RD, PARADISE CA 95969
051-180-045-000 406 VALLEY VIEW DR, PARADISE CA 95969
051-180-074-000* 400 VALLEY VIEW DR, PARADISE CA 95969
051-190-067-000 0 REDBUD DR, PARADISE CA 95969
051-190-107-000* 0 HIGH RIDGE AVE, PARADISE CA 95969
051-190-109-000 0 VALLEY VIEW, PARADISE CA 95969
051-190-110-000 122 VALLEY VIEW DR, PARADISE CA 95969
051-230-030-000* 4662 SKYWAY, PARADISE CA 95969
051-250-055-000* 380 BOW HUNTER LN, PARADISE CA 95969
051-250-061-000* 3960 NEAL RD, PARADISE CA 95969
74 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
051-250-101-000 280 OAK SPRING RD, PARADISE CA 95969
051-250-149-000 0 STARLIGHT CT, PARADISE CA 95969
051-260-012-000* 219 PRINCETON CIR, PARADISE CA 95969
051-300-001-000 333 REDBUD DR, PARADISE CA 95969
051-300-020-000 292 REDBUD DR, PARADISE CA 95969
051-300-037-000* 5898 CRESTMOOR DR, PARADISE CA 95969
051-320-002-000 247 REDBUD DR, PARADISE CA 95969
051-320-003-000 239 REDBUD DR, PARADISE CA 95969
051-330-014-000 226 REDBUD DR, PARADISE CA 95969
051-460-039-000 0 POINT WEST DR, PARADISE CA 95969
051-480-010-000 5771 ACORN RIDGE DR, PARADISE CA 95969
051-480-012-000 270 CHANDLER DR, PARADISE CA 95969
052-011-067-000 727 EDWARDS LN, PARADISE CA 95969
052-011-106-000* 724 SUNSET DR, PARADISE CA 95969
052-012-023-000* 810 BILLE RD, PARADISE CA 95969
052-012-064-000* 6100 RIPLEY LN, PARADISE CA 95969
052-012-065-000* 6102 RIPLEY LN, PARADISE CA 95969
052-024-079-000 613 CASTLE DR, PARADISE CA 95969
052-031-114-000 519 VALLEY VIEW DR, PARADISE CA 95969
052-031-124-000 605 VALLEY VIEW DR, PARADISE CA 95969
052-033-011-000* 6020 CRESTVIEW DR, PARADISE CA 95969
052-033-015-000 6032 CRESTVIEW DR, PARADISE CA 95969
052-040-036-000 664 EDWARDS LN, PARADISE CA 95969
052-050-039-000* 709 POPPY LN, PARADISE CA 95969
052-110-009-000 480 BOQUEST BLVD, PARADISE CA 95969
75 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
052-110-010-000* 484 BOQUEST BLVD, PARADISE CA 95969
052-110-037-000 624 ELLIOTT RD, PARADISE CA 95969
052-150-010-000 802 VIOLET WAY, PARADISE CA 95969
052-150-014-000 802 WINDSOR DR, PARADISE CA 95969
052-150-051-000 5848 JAMES DR, PARADISE CA 95969
052-170-010-000* 5935 OLIVER RD, PARADISE CA 95969
052-182-024-000 529 HORSESHOE HILL DR, PARADISE CA 95969 052-212-003-000* 52 PEARSON RD, PARADISE CA 95969
052-221-001-000 0 BIRCH ST, PARADISE CA 95969
052-226-001-000* 284 PEARSON RD, PARADISE CA 95969
052-226-002-000* 296 PEARSON RD, PARADISE CA 95969
052-235-029-000 5553 SIERRA PARK DR, PARADISE CA 95969
052-238-034-000 726 HIGHLAND LN, PARADISE CA 95969
052-241-027-000* 5748 HOLLY LN, PARADISE CA 95969
052-242-039-000 5726 SHADY LN, PARADISE CA 95969
052-242-042-000 5722 SHADY LN, PARADISE CA 95969
052-242-050-000 5741 ACADEMY DR, PARADISE CA 95969
052-250-046-000 5275 BLACK OLIVE DR, PARADISE CA 95969
052-260-010-000 0 HILLCREST DR, PARADISE CA 95969
052-260-011-000 593 HILLCREST DR, PARADISE CA 95969
052-271-074-000 5359 FOSTER RD, PARADISE CA 95969
052-272-020-000 434 CIRCLEWOOD DR, PARADISE CA 95969
052-300-001-000 5939 PINE VIEW DR, PARADISE CA 95969
052-310-031-000 585 VALSTREAM DR, PARADISE CA 95969
052-340-031-000 726 WINDING WAY, PARADISE CA 95969
76 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
052-340-045-000* 0 WINDING WAY, PARADISE CA 95969
052-360-019-000* 5490 FOSTER RD, PARADISE CA 95969
052-380-038-000* 616 CIRCLEWOOD DR, PARADISE CA 95969
052-390-009-000 6149 LAUREL DR, PARADISE CA 95969
052-390-040-000 456 SUNSET DR, PARADISE CA 95969
052-390-043-000 480 SUNSET DR, PARADISE CA 95969
053-011-048-000 1228 TAHOE WAY, PARADISE CA 95969
053-011-068-000 6352 TAHOE WAY, PARADISE CA 95969
053-011-101-000* 6150 CORAL AVE, PARADISE CA 95969
053-021-082-000 7321 SKYWAY, PARADISE CA 95969
053-021-089-000 7419 SKYWAY, PARADISE CA 95969
053-022-022-000 7500 SKYWAY, PARADISE CA 95969
053-022-025-000 7406 SKYWAY, PARADISE CA 95969
053-022-026-000 1010 BILLE RD, PARADISE CA 95969
053-023-005-000* 6153 BOWMAN DR, PARADISE CA 95969
053-050-021-000* 1012 CENTRAL PARK DR, PARADISE CA 95969 053-050-045-000 990 CENTRAL PARK DR, PARADISE CA 95969
053-060-005-000 903 CENTRAL PARK DR, PARADISE CA 95969
053-060-023-000 6144 GREENWOOD DR, PARADISE CA 95969
053-060-032-000* 839 CENTRAL PARK DR, PARADISE CA 95969 053-070-019-000 5977 WILLIAMS DR, PARADISE CA 95969
053-080-020-000* 6181 WOODBROOK CIR, PARADISE CA 95969
053-080-038-000 1000 BROOKWOOD CIR, PARADISE CA 95969
053-104-040-000 0 COPELAND RD, PARADISE CA 95969
053-110-018-000 991 MAPLE PARK DR, PARADISE CA 95969
77 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
053-110-076-000* 1073 ELLIOTT RD, PARADISE CA 95969
053-110-081-000 1021 PLEASANT LN, PARADISE CA 95969
053-110-087-000 0 PLEASANT LN, PARADISE CA 95969
053-131-048-000* 0 GOLDEN OAKS RD, PARADISE CA 95969
053-132-055-000* 5777 JUBILEE LN, PARADISE CA 95969
053-140-033-000* 1691 YOUNG AVE, PARADISE CA 95969
053-140-079-000 1687 BILLE RD, PARADISE CA 95969
053-150-093-000* 6170 OPAL LN, PARADISE CA 95969
053-150-142-000 6180 MAINORD LN, PARADISE CA 95969
053-150-180-000 1378 DELIA WAY, PARADISE CA 95969
053-162-079-000 6023 N LIBBY RD, PARADISE CA 95969
053-162-080-000 6027 N LIBBY RD, PARADISE CA 95969
053-162-083-000 1359 BRILL RD, PARADISE CA 95969
053-170-054-000 1658 NELSON LN, PARADISE CA 95969
053-170-073-000* 1550 KAY CT, PARADISE CA 95969
053-170-131-000 1610 YOUNG AVE, PARADISE CA 95969
053-170-145-000 1558 KAY CT, PARADISE CA 95969
053-180-030-000 5892 KIBLER RD, PARADISE CA 95969
053-180-086-000* 1651 LOG CABIN LN, PARADISE CA 95969
053-190-041-000 5909 DEL MAR AVE, PARADISE CA 95969
053-190-045-000 5933 DEL MAR AVE, PARADISE CA 95969
053-190-082-000 5883 ORRIN DR, PARADISE CA 95969
053-210-006-000 1489 FOX RD, PARADISE CA 95969
053-210-011-000 5917 HAZEL WAY, PARADISE CA 95969
053-210-014-000 5891 HAZEL WAY, PARADISE CA 95969
78 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
053-210-015-000* 5887 HAZEL WAY, PARADISE CA 95969
053-210-053-000 1428 SLEEPY HOLLOW LN, PARADISE CA 95969 053-210-058-000 5876 N LIBBY RD, PARADISE CA 95969
053-210-071-000 5921 HAZEL WAY, PARADISE CA 95969
053-210-077-000 1450 SLEEPY HOLLOW LN, PARADISE CA 95969 053-230-049-000* 1640 COTTONTAIL LN, PARADISE CA 95969
053-230-093-000 5801 NIELSEN DR, PARADISE CA 95969
053-230-101-000 1644 COTTONTAIL LN, PARADISE CA 95969
053-230-122-000 5857 KIBLER RD, PARADISE CA 95969
053-230-125-000 5855 KIBLER RD, PARADISE CA 95969
053-240-030-000 6347 PENTZ RD, PARADISE CA 95969
053-240-042-000* 6350 HAROLD LN, PARADISE CA 95969
053-240-045-000 6339 HAROLD LN, PARADISE CA 95969
053-250-009-000 6205 PENTZ RD, PARADISE CA 95969
053-250-011-000* 1823 HEYNEN RD, PARADISE CA 95969
053-250-038-000* 6285 PENTZ RD, PARADISE CA 95969
053-260-021-000 1876 CONIFER DR, PARADISE CA 95969
053-260-044-000 5733 CANYON VIEW DR, PARADISE CA 95969
053-260-055-000 1877 DEL RIO WAY, PARADISE CA 95969
053-272-072-000 5807 FICKETT LN, PARADISE CA 95969
053-300-004-000 1313 DEODARA WAY, PARADISE CA 95969
053-300-010-000 1322 DEODARA WAY, PARADISE CA 95969
053-300-029-000* 5780 KENGLO DR, PARADISE CA 95969
053-300-033-000 1303 NUNNELEY RD, PARADISE CA 95969
053-300-063-000 5784 BONNIE LN, PARADISE CA 95969
79 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
053-310-039-000 1866 CONIFER DR, PARADISE CA 95969
053-320-012-000 6089 VISTA KNOLLS DR, PARADISE CA 95969 053-330-087-000* 1415 NUNNELEY RD, PARADISE CA 95969
053-330-105-000 5780 DEERPARK, PARADISE CA 95969
053-330-112-000 5835 DEERPARK, PARADISE CA 95969
053-330-113-000* 5805 DEERPARK, PARADISE CA 95969
053-330-115-000* 5821 DEERPARK, PARADISE CA 95969
053-330-121-000* 5838 DEERPARK, PARADISE CA 95969
053-330-148-000* 1372 ELLIOTT RD, PARADISE CA 95969
053-330-149-000* 1376 ELLIOTT RD, PARADISE CA 95969
054-010-052-000* 829 PEARSON RD, PARADISE CA 95969
054-020-024-000 5724 PARADISE AVE, PARADISE CA 95969
054-030-014-000* 5703 PARADISE AVE, PARADISE CA 95969
054-030-025-000 5722 NEWMAN AVE, PARADISE CA 95969
054-030-029-000 5659 PARADISE AVE, PARADISE CA 95969
054-030-055-000* 5677 SCOTTY LAKE DR, PARADISE CA 95969 054-040-113-000 565 PEARSON RD, PARADISE CA 95969
054-040-114-000* 5708 SYDNEY LN, PARADISE CA 95969
054-040-136-000 5720 ACADEMY DR, PARADISE CA 95969
054-060-003-000 824 PEARSON RD, PARADISE CA 95969
054-060-005-000 5639 NEWLAND RD, PARADISE CA 95969
054-060-100-000* 5589 NEWLAND RD, PARADISE CA 95969
054-060-117-000 5623 GRAMERCY PL, PARADISE CA 95969
054-070-010-000 1190 GLEN CIR, PARADISE CA 95969
054-070-015-000 1182 GLEN CIR, PARADISE CA 95969
80 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
054-100-024-000 5519 PALOMA AVE, PARADISE CA 95969
054-120-053-000 5304 BENNETT RD, PARADISE CA 95969
054-120-059-000 5241 BENNETT RD, PARADISE CA 95969
054-141-022-000* 5684 CLARA LN, PARADISE CA 95969
054-141-053-000 5715 BONNIE LN, PARADISE CA 95969
054-151-051-000 1381 LANDS END, PARADISE CA 95969
054-151-068-000 5460 NEWLAND RD, PARADISE CA 95969
054-151-071-000* 5550 MARK LN, PARADISE CA 95969
054-163-032-000* 5583 BUTTE VIEW TERR, PARADISE CA 95969 054-171-065-000 5496 SAWMILL RD, PARADISE CA 95969
054-171-104-000 5525 BELVISO TERR, PARADISE CA 95969
054-171-113-000* 0 RED OAK RD, PARADISE CA 95969
054-172-032-000* 0 EDGEWOOD LN, PARADISE CA 95969
054-181-032-000* 1397 N-B LN, PARADISE CA 95969
054-182-013-000 1442 GRACEPHIL LN, PARADISE CA 95969
054-182-045-000* 1438 TONI DR, PARADISE CA 95969
054-182-058-000 1453 TONI DR, PARADISE CA 95969
054-191-030-000 1378 KERR LN, PARADISE CA 95969
054-191-046-000* 5431 T. J. WAY, PARADISE CA 95969
054-191-071-000 1358 MANHATTAN DR, PARADISE CA 95969
054-191-077-000 1395 KERR LN, PARADISE CA 95969
054-192-033-000* 1431 ROY LN, PARADISE CA 95969
054-192-064-000* 5360 S LIBBY RD, PARADISE CA 95969
054-192-095-000* 1424 DOTTIE LN, PARADISE CA 95969
054-202-043-000 5393 BREEZEWOOD DR, PARADISE CA 95969
81 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
054-210-011-000* 5665 CHANEY LN, PARADISE CA 95969
054-210-130-000* 5863 PENTZ RD, PARADISE CA 95969
054-210-038-000 5888 PENTZ RD, PARADISE CA 95969
054-210-115-000* 5721 CHANEY LN, PARADISE CA 95969
054-220-021-000 0 PENTZ RD, PARADISE CA 95969
054-230-040-000 5523 FEATHER RIVER PL, PARADISE CA 95969 054-240-009-000 1870 MOSURE RD, PARADISE CA 95969
054-240-011-000 5531 PENTZ RD, PARADISE CA 95969
054-240-034-000* 1850 MOSURE LN, PARADISE CA 95969
054-240-063-000* 2269 STEARNS RD, PARADISE CA 95969
054-240-064-000* 2279 STEARNS RD, PARADISE CA 95969
054-240-072-000* 2351 STEARNS RD, PARADISE CA 95969
054-260-031-000* 1899 DRENDEL CIR, PARADISE CA 95969
054-290-021-000 5709 COPELAND RD, PARADISE CA 95969
054-290-025-000 0 COPELAND RD, PARADISE CA 95969
054-290-027-000 5688 COPELAND RD, PARADISE CA 95969
054-310-013-000 5560 ANGEL DR, PARADISE CA 95969
054-310-026-000 5578 HEAVENLY PL, PARADISE CA 95969
055-020-008-000 283 ROE RD, PARADISE CA 95969
055-020-100-000 264 BURDEN TERR, PARADISE CA 95969
055-020-121-000* 321 BURDEN TERR, PARADISE CA 95969
055-030-047-000* 130 COAST RANGE LN, PARADISE CA 95969
055-030-048-000 132 COAST RANGE LN, PARADISE CA 95969
055-040-035-000* 5598 WILSON LN, PARADISE CA 95969
055-040-042-000 5566 WILSON LN, PARADISE CA 95969
82 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
055-050-054-000 88 BLUE JAY LN, PARADISE CA 95969
055-050-069-000 72 SEAMAN LN, PARADISE CA 95969
055-050-077-000 3565 LASSEN RD, PARADISE CA 95969
055-050-083-000* 85 BLUE JAY LN, PARADISE CA 95969
055-070-018-000 0 CHAPARRAL DR, PARADISE CA 95969
055-080-012-000 0 CHAPARRAL DR, PARADISE CA 95969
055-080-029-000 100 CHAPARRAL DR, PARADISE CA 95969
055-080-038-000 3370 NEAL RD, PARADISE CA 95969
055-090-029-000 3272 NEAL RD, PARADISE CA 95969
055-111-024-000 5295 SCOTTWOOD RD, PARADISE CA 95969
055-112-036-000* 810 ROE RD, PARADISE CA 95969
055-112-050-000 780 ROE RD, PARADISE CA 95969
055-112-051-000 786 ROE RD, PARADISE CA 95969
055-112-085-000* 804 ROE RD, PARADISE CA 95969
055-112-086-000 5276 BUCKBOARD LN, PARADISE CA 95969
055-120-071-000 367 ROE RD, PARADISE CA 95969
055-130-143-000* 5101 FOSTER RD, PARADISE CA 95969
055-140-063-000 5200 SCOTTWOOD RD, PARADISE CA 95969
055-150-069-000 522 ELDREDGE DR, PARADISE CA 95969
055-180-020-000 1239 BENNETT RD, PARADISE CA 95969
055-180-061-000 0 ANCHOR WAY, PARADISE CA 95969
055-180-062-000 1208 ANCHOR WAY, PARADISE CA 95969
055-180-068-000* 5100 WARNKE DR, PARADISE CA 95969
055-180-081-000 5195 BENNETT RD, PARADISE CA 95969
055-190-024-000 0 CIRCLE LN, PARADISE CA 95969
83 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
055-190-044-000 5021 CIRCLE LN, PARADISE CA 95969
055-201-003-000 5327 EDGEWOOD LN, PARADISE CA 95969
055-201-032-000* 5315 SAWMILL RD, PARADISE CA 95969
055-201-043-000 1587 SUNNY ACRES RD, PARADISE CA 95969
055-201-046-000* 1569 SUNNY ACRES RD, PARADISE CA 95969 055-211-001-000 1354 KELLER LN, PARADISE CA 95969
055-211-061-000 5277 S LIBBY RD, PARADISE CA 95969
055-211-063-000* 5279 S LIBBY RD, PARADISE CA 95969
055-212-010-000 5270 S LIBBY RD, PARADISE CA 95969
055-212-028-000 1439 BENNETT RD, PARADISE CA 95969
055-212-033-000 5246 S LIBBY RD, PARADISE CA 95969
055-212-036-000* 1433 BENNETT RD, PARADISE CA 95969
055-212-042-000* 1425 CARROLL LN, PARADISE CA 95969
055-220-008-000 5153 S LIBBY RD, PARADISE CA 95969
055-220-020-000 1342 BENNETT RD, PARADISE CA 95969
055-220-031-000 1332 BENNETT RD, PARADISE CA 95969
055-220-049-000 5154 CIRCLE LN, PARADISE CA 95969
055-261-042-000 2222 THORNBURG RD, PARADISE CA 95969
055-261-050-000* 2220 RICHMOND RD, PARADISE CA 95969
055-261-080-000 2220 STEARNS RD, PARADISE CA 95969
055-261-081-000* 0 DEMILLE RD, PARADISE CA 95969
055-262-009-000* 5449 PENTZ RD, PARADISE CA 95969
055-262-018-000* 5361 PENTZ RD, PARADISE CA 95969
055-262-046-000 2260 STEARNS RD, PARADISE CA 95969
055-270-012-000* 5390 PENTZ RD, PARADISE CA 95969
84 EXHIBIT A
Properties with overgrown vegetation posing a public
nuisance.

Each property has been sent a Notice of Violation and three (3) or more citations. The properties identified with an asterisk * are in tax default status. Properties brought into compliance are shown in strike-through font.
055-270-017-000 5438 PENTZ RD, PARADISE CA 95969
055-270-020-000 0 GOLF RD, PARADISE CA 95969
055-270-030-000 2352 STEARNS RD, PARADISE CA 95969
055-320-001-000* 1354 BENNETT RD, PARADISE CA 95969
055-330-007-000 2012 HILLPARK LN, PARADISE CA 95969
055-330-014-000 0 HILLPARK LN, PARADISE CA 95969
055-400-023-000 861 SENECA DR, PARADISE CA 95969
055-400-025-000 820 SENECA DR, PARADISE CA 95969
055-400-039-000 5245 ROSEHILL RD, PARADISE CA 95969
055-400-052-000 841 SUN RIVER CT, PARADISE CA 95969
055-410-017-000 84 GRINDING ROCK RD, PARADISE CA 95969
055-420-006-000 2371 JOSEPHS CT, PARADISE CA 95969
055-430-020-000 2380 CLEARVIEW DR, PARADISE CA 95969
055-440-001-000* 4974 COUNTRY CLUB DR, PARADISE CA 95969 055-440-010-000* 5271 ROYAL CANYON LN, PARADISE CA 95969 055-440-021-000 5127 FEATHER ROCK CT, PARADISE CA 95969 055-440-028-000 5220 FALCONS VIEW CT, PARADISE CA 95969 055-440-134-000 5035 COUNTRY CLUB DR, PARADISE CA 95969 055-470-003-000* 2384 TOKAY CT, PARADISE CA 95969
055-470-005-000* 2388 TOKAY CT, PARADISE CA 95969
055-520-085-000* 5211 ROYAL CANYON LN, PARADISE CA 95969 85 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 6(a)
ORIGINATED BY: Colette Curtis, Recovery and Economic
Development Director
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Pioneer Community Energy Study

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Hear a report on the Expansion Study completed by Pioneer Community Energy; and

2. Consider directing staff to bring back a draft ordinance for Council consideration on a future agenda.

Background:

CCA programs are authorized under Assembly Bill 117 allowing local governments to function as energy providers, purchasing electrical energy from various sources on the wholesale market.

CCAs operate on behalf of residents and businesses, securing energy from alternative suppliers while still utilizing transmission and distribution services from existing utility providers like PG&E.

CCAs provide only electricity and do not own the infrastructure, such as poles or wires, relying on PG&E's transmission and distribution lines for electricity delivery.

Pioneer is a CCA that launched in 2018 and currently serves the counties of Placer and El Dorado, the cities of Auburn, Colfax, Lincoln, Grass Valley, Nevada City, Placerville, Rocklin, and the Town of Loomis.

In July 2024, Paradise Town Council heard a presentation from Pioneer Community Energy regarding an assessment study to determine if Paradise residents would benefit from joining Pioneer Community Energy, a Joint Powers Authority, not for profit public agency which serves other jurisdictions in California. Council approved an expenditure of $3.750 to be part of the assessment study, with the outcome of that study to be presented once completed. The study has now been completed, and tonight Council will hear a presentation regarding the findings of the study.

Analysis:

After hearing the presentation, if Council chooses to move forward with Pioneer Community Energy for the residents of Paradise, Council will need additional information from staff, including a draft ordinance to potentially join the JPA. The decision to officially move forward would not be made until an ordinance is drafted and considered by Council. 86 Financial Impact:

There is no general fund impact for this item, staff time to prepare a draft ordinance would be nominal. There may be future energy savings for the residents of Paradise, as well as the Town of Paradise as an organization, if Council moves forward with joining the JPA through a future vote.
87 Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 6(b)
ORIGINATED BY: Colette Curtis, Recovery and Economic
Development Director
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Memorandum of Understanding with Butte County for VEOCI, Virtual EOC

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Consider approving a Memorandum of Understanding with Butte County for services with VEOCI virtual EOC software. (ROLL CALL VOTE) Background:

The Town of Paradise provides support to first responders in an emergency through our Emergency Operation Center (EOC). Every Town employee functions as a disaster worker in an emergency, with a specific role to be performed in emergencies. Traditionally, EOCs have been conducted in person, in Paradise Council Chambers, and provide functional support to first responders through Planning and Intelligence, Logistics, Finance, Liaison, and Information sections.

Analysis:

Emergency situations are often fluid, requiring immediate response when employees may not be able to report to a physical EOC right away. During the COVID-19 pandemic, virtual protocols were developed to meet the social distancing requirements of the time while still responding to emergencies. Through that experience, it became clear that virtual EOC capabilities would be an important addition to the Town’s emergency response.

In 2023, the Town began exploring virtual EOC software. Regional partnerships are vital in emergencies, and so the Town worked with Butte County and other local jurisdictions to procure software that would fulfill our virtual EOC needs. Butte County issued an RFP and selected VEOCI as the contractor. Butte County will maintain the contract with VEOCI, with local jurisdictions, including the Town of Paradise, entering into an MOU with the County for services through their VEOCI contract.

Financial Impact:

The Town’s portion of the VEOCI contract is $15,737.44 for the first year, $16,524.31 for the second year, and $17,350.53 for the third year. The first year has already been included in the Recovery and Economic Development Department budget for 2024-25. 88

Page 1 of 13 ends

MEMORANDUM OF UNDERSTANDING

BETWEEN
COUNTY of BUTTE

AND THE TOWN OF PARADISE
FOR USE AND MAINTENANCE OF VEOCI INC. SOFTWARE
This Memorandum of Understanding, hereinafter referred to as MOU is effective upon execution, by and between the COUNTY OF BUTTE, a political subdivision of the State of California herein after referred to as “County” or “Customer” through its Department of Administration, and the Town of Paradise, hereinafter referred to as “Participant”, hereinafter individually “Party” and hereinafter collectively “Parties”.

The purpose of this MOU is to provide governance and guidelines in the use and maintenance of the Veoci Software. This document is intended to describe countywide policies and jurisdictional roles and responsibilities.

RECITALS
WHEREAS, the COUNTY OF BUTTE is designated as the Operational Area by the Butte County Board of Supervisors, § 3296, 8-2 (a) and the California Emergency Services Act, § 2409 and is responsible for the coordination of emergency activities and serving as a link in the system of communications and coordination between the state’s emergency operations centers and the operation centers of the Town of Paradise;
WHEREAS, the Town of Paradise is responsible for serving in the Emergency Management function at the local government level within the operational area; WHEREAS, County through Administration and the Division of Emergency Management, has executed contract X25758 with VEOCI, INC (Veoci) to provide an emergency management software designed to improve operational area coordination during an emergency, community event, or disaster;
WHEREAS, County and the Town of Paradise desire to enter into this MOU to use and maintain the Veoci software during the term of this agreement;
NOW THEREFORE, in consideration of the covenants contained hereinafter the Town of Paradise and County agree as follows:

Scope of Services
Participant shall receive from Veoci Inc. the agreed upon services and maintenance outlined in contract X25758. County’s involvement in the MOU is limited to maintaining contract X25758 and acting as a liaison between Veoci and Participant.

Statement of Work per X25758

1. Scope Statement
Veoci will provide a cloud-based, SaaS incident and emergency management solution by implementing Veoci's government CORE product.

This SOW, including all services and deliverables described herein, is proposed subject to the terms and conditions of the RFP response between Veoci and Customer, numbered RFP 61/23. 89

Page 2 of 13 ends

2. Change Management & Governance Plan
Veoci utilizes Project Management tools that follow standard practices, such as the Project Management Body of
Knowledge (PMBOK Guide), which describes established norms, methods, processes, and practices to ensure successful implementations and completion across all phases of the project life cycle.

Veoci also internally uses the system’s tools (i.e., Task Management, Plans, Forms, Workflows, Reports, Dashboards, Rooms, and Calendars) to manage customer projects. These provide a venue for planning, controlling, and coordinating projects in collaboration with all stakeholders while also presenting a clear and consistent methodology for logging and sharing project data and metrics to Users with permissions. Veoci’s tools facilitate updating project status information in real-time and allow for ongoing project reporting.

During project implementation, the customer may identify additional functionality. Any request that changes the scope of the project or the functionality beyond that identified in the SOW requires a change request and must be reviewed and approved by the project stakeholders.

Change requests are entered into Veoci via a Workflow where the impact of the proposed change on scope, deliverables, schedule, and cost are evaluated. The project sponsor then approves or rejects the change, a new SOW (or an SOW addendum) detailing the approved changes is generated, and the entire process is recorded in the Change Management Log.

3. Veoci Implementation Plan
Veoci’s approach to system implementation comprises five phases. The Veoci tools for Project Management will be available to manage the project following PMP standards during all the project phases. Individual project milestones may go through these phases independently and in parallel, completing one project milestone while others are still in progress.

Phase 1. Requirements and Planning
During this phase, the Customer Project Lead (and/or backup), other stakeholders identified by the customer, and the Veoci team work together to determine the project requirements, defining details about the implementation plan, identifying the material resources and staff (both from the customer and Veoci) needed to successfully complete the project, and creating the overall configuration plan.

The customer will be responsible for not only communicating requirements, but also gathering and organizing information from their internal stakeholders. The customer will provide the Veoci team with an understanding of its organization and processes, methods, and software applications in use that may need integration, as well as other information necessary to ensure a successful planning phase. As indicated throughout the proposal, Veoci will compile the requirements to implement the defined solution.

Both parties will also work together on the Planning phase when the customer’s team will provide the information needed to the Veoci team for the creation of the overall plan for the configuration of the defined solution.

Phase 2. Configuring, Piloting, and User Feedback
During this phase, the assigned Veoci Solutions Engineers will build, configure, and test the new system as defined in the previous phase. The customer will assign personnel as required to work with Veoci on final testing and specify any changes needed. The Veoci team will also work with the customer’s team to implement integrations with other systems if required. If development effort is needed, any additional cost associated with integration will be assessed.

Phase 3. User Acceptance and Go-Live
90

Page 3 of 13 ends

During this phase, the customer will accept the system implemented. Veoci provides technical support to the customer’s Administrators and Users to complete all knowledge transfer activities prior to the following training phase. Employees will answer Veoci team members’ questions, provide support and reviews, assist with migration and integration, and be available for UAT (User Acceptance Testing).

Phase 4. Training
Veoci is simple, intuitive, and easy to use, so most users need only an introductory formal training. Neither the end-users nor Administrators need a formal IT background or programming knowledge to learn Veoci.

Veoci's training empowers Administrators to modify and change the solution and add processes and methods due to the no-code configuration.

The training structure and delivery mechanisms are based on our understanding of a customer’s solutions and needs. Possible selections for training options are listed below but these items are not specifically included:
 Remote orientation webinars recorded for later viewing  Veoci's online Help/Knowledge Base that is part of the Veoci platform  Short Task and role-specific videos for end-users
 Train-the-trainer sessions
 Boot Camp training sessions for Administrators that are available in-person or online
An overview of Veoci knowledge resources, including webinars, Boot Camps, training courses, and downloadable training materials, can be found at veoci.com/knowledge-resources.

Phase 5: Maintenance & Technical Support
Once Veoci has completed the Implementation Phase and the customer verifies acceptance of the solution, the Maintenance and Technical Support Phase begins and remains in place for the duration of the associated software licenses. Maintenance includes updates to Veoci software, patches and fixes, and major upgrades to the platform to support operational effectiveness.

Maintenance includes only minor changes to customer-specific solutions. Technical support includes access to Veoci resources along with continued monitoring and assistance from the Implementation team.

Regarding maintenance, the Veoci Development team follows the agile methodology and delivers a new version of software every few weeks. The team completes this process transparently, and Users generally do not notice changes until their Administrators decide to implement the new functionality. In a majority of releases, changes are small, designed to be readily apparent, and require no training. If a change will significantly affect how Users navigate within the platform, Veoci provides extensive advance notice and, as needed, provides pop-ups and introductory text to facilitate adapting to the new version. New tools, applications, or functionalities requested by the customer are not included in software updates. New versions of the software are available to customers at no additional cost.

Veoci’s technical support encompasses access to the Veoci Knowledge Base, Help Desk, and community resources such as webinars and User groups. These resources dispense technical advice and innovative assistance to allow the customer to resolve problems with its solution.

A team of Veoci professionals, including Solutions Engineers and Customer Success Managers (CSMs), remain available to provide ongoing support and input as part of Veoci's commitment to helping customers maximize the value of their solution. If a customer requires additional features or significant changes to the existing solution, Veoci will respond to these requests and bill at our standing rate for professional service hours.
91

Page 4 of 13 ends

Engagement Model
The Veoci team will be engaged during implementation for an average of 5 hours per week until the implementation outlined in this SOW is complete with no additional fees beyond what is included in the MSA. Engagement includes weekly meetings plus offline work such as building solutions, project documentation, and completing software integrations. Should a customer need an implementation to be expedited, Veoci can be flexible if we have resources available.

The Veoci team will be available to perform the implementation, beginning at the agreed upon start date and continuing through the delivery of the completed solution. If implementation delays occur due to a lack of customer participation or cooperation, team resources may be removed from the implementation. Team resources would then be reassigned depending on availability.

Customer Participation Vital for Implementation Success Veoci’s implementation process is highly collaborative and includes regular participation from the customer’s team. Successful delivery of an on-time solution requires that customers provide data and information and respond to requests in a timely manner, as well as attend regular project status meetings to provide input on the solution.

Implementations are managed from within the customer’s Support and Collaboration room where task management, plans, forms and workflows, reports, dashboards, and calendars are integrated into the Veoci platform. These tools allow Veoci to plan, control, and coordinate projects in collaboration with all stakeholders involved. All communications, action items, tasks, and meeting minutes related to the project are logged and shared in Veoci rooms accessible and restricted to permissioned Users. The Room Dashboards provide project status information in real-time and allow for ongoing project reporting.

4. Verified Deliverables
Veoci uses the Deliverable Verification Workflow to automate the process of collecting customer acknowledgment and acceptance of each deliverable listed in the project plan. Once a deliverable has been built and undergone User Acceptance Testing (UAT) by the customer and no further additions or revisions are required to complete the deliverable, Veoci will request that the customer accept and acknowledge receipt of the deliverable. This is done through an automated Workflow process that generates an email notification for the Customer Project Manager to review and approve. The Project Management Dashboard displays the status of all project deliverables. As Deliverables are accepted and become part of the customer’s Veoci solution, Veoci considers implementation complete and is available to provide ongoing support.

5. Milestones and Deliverables

5.1. Incident / Event Response
The Incident / Event Response product provides a means to digitize and operationalize an organizations response plans and tasks for all-hazards events. A customizable and reusable template allows for adding predesignated members, sending notifications, prepopulating tasks and documents for planned events and no-notice incidents.

Upon launching the template, the virtual Emergency Operations Center (EOC) allows for communication and collaboration to manage the incident or event. Dashboards have been curated to create a common operating picture.

5.1.1. Incident Management
Whenever an organization is going to manage an all-hazards incident response, planned event, special event, exercises, situational awareness, or other collaboration is needed, it will create an Incident Room. All activity having to do with an incident or event is managed within a Room, which comes with a rich set of tools that are useful during the planning, response, 92

Page 5 of 13 ends

recovery, and mitigation stages. There is no restriction on how many Rooms can be created or open at the same time. This means that multiple incidents, exercises, and daily operations can be run in parallel.

Veoci will create an all-hazards “Room Template” that can be launched on-demand. This template incorporates the following NIMS and ICS/Compliant functionality.

5.1.2. Incident Logging
Veoci will implement its best practice Form for logging incidents. Incident status can be tracked and related to
Resource Requests and Mission Tasks. The following Reports will be created for incidents: All Incidents, Open Incidents, Incidents by Status, Incidents by Type, and if applicable Incidents by County and Incidents by Jurisdiction.

All Reports can be viewed in a tabular format, calendar, or map, or exported to PDF or Excel.

The customer can create an unlimited number of additional reports using Veoci’s point-andclick interface.

5.1.3. ICS Forms and Incident Action Plan
Veoci provides comprehensive, dynamic, and FEMA and CPG 101 compliant ICS forms for all departments and divisions in a given jurisdiction. Veoci has successfully deployed these to meet all customers' reporting requirements. When populated, ICS forms can roll up or be independently printed and exported to PDF. ICS Forms included: 201, 202, 203, 204, 205, 205A, 206, 207, 208, 213RR, 214.

Veoci will implement its best practice IAP solution. The IAP combines the appropriate forms as selected by the Incident Commander or Administrator, and when populated, can be printed and exported to PDF.

Veoci will implement its best practice ICS and IAP Dashboard which provides easy access to complete or view ICS Forms and the IAP and can be integrated with all maps, timelines, and threads.

5.1.4. Resource Request Management
Veoci will provide its best practice workflow for tracking resource requests. This workflow is based on the input fields and process outlined in ICS 213 RR. The following reports are included with this workflow: Requests by Status, Requests Initiated, Requests Awaiting Me, Resource Requests In Progress, Resource Requests Closed. All of these reports can be viewed in tabular format, calendar, or map, and can be exported to PDF or Excel.

Veoci will implement a Resource Request Dashboard which provides easy access to create, track or view all ICS 213 Resource Requests created for the incident/Room.

5.1.5. Windshield Survey
A Windshield Survey Form will be created to report damage. The Form and it's reports can be accessed from the Events Dashboard. The Form includes a Veoci default Print Template and a general saved view.

5.1.6. Damage Assessment Form
A Damage Assessment Form will be created that allows users to document damage that occurred at a property. This form captures critical information such as the address, property type, photos / videos, estimated damage amount, and contact information. A report will be created that shows all damage assessments completed and a second report will show the aggregate sum of estimated damage amounts. All Reports can be viewed in a tabular format, on a map, and on a dashboard.

5.1.7. After Action Report, Exercise Plan, and Improvement Plan 93

Page 6 of 13 ends

Veoci will implement its best practice solutions for After Action Reports, Exercise Plans, and Improvement Plans, based on the HSEEP principles. These Reports and Plans can be completed through online Forms and each will have an output template that can be printed or saved as a PDF. A Dashboard will be created that displays Reports and Plans and a tool for tracking outstanding corrective actions will be available. Corrective actions can be assigned and notification alerts are delivered via the web, mobile app, email, and SMS if desired.

5.1.8. Road Closures
A Form will be created which allows the customer to document planned or unplanned road closures. The road closure data is available on a Dashboard, Calendar, and Map.

5.1.9. Shelter Status Reports
A Form will be created that allows the customer to record shelter information including their location, type, resources, accessibility, and guest counts. This information will be displayed on a Dashboard and Map.

5.1.10. Meeting Schedule
A Form will be created that allows the customer to create a meeting schedule, document agendas, and record minutes. The information will be available on a Dashboard and on a Room Calendar.

5.1.11. Incident Briefing Form
Veoci will implement its best practice Form for quick Incident Briefing. This Form keeps track of all incident briefings and includes a summary of the situation, objectives, key decisions, and date/time of the next Incident Briefing.

The latest entry is always displayed in the Events Dashboard.

5.1.12. Daily Operations Room
Veoci provides a virtual standing room for managing Daily Operations of the County, City, Jurisdiction or department; In this room there will be a Monitoring Dashboard that includes the following:

A weather map,
An Operational Picture Map View with visibility and mapping of Incident Reports, Road Closures, Shelters,
Damage Assessments and Windshield Surveys,
Assignment and monitoring of tasks,
Room Messages, and
Notifications / Check-ins

5.2. County and Jurisdiction Structure / Relationship

5.2.1. Organizations
The Veoci team will create 7 Organizations in Veoci:

Butte Emergency Operations Center Command
Town of Paradise
City of Chico
City of Biggs
City of Gridley
City of Oroville
One other TBD
Each Organization will have 1 EOC Group and the Incident / Event Response milestone described in Section 5.1 will be replicated in each Group.

A total of 20 EOC management Lists will also be created to facilitate user management. 94

Page 7 of 13 ends

Within the Town’s platform, the Town will have:
 2 Full Time licenses
 15 Mid-Tier licenses
 100 Infrequent licenses

5.2.2. Organization Relationships - County and Jurisdictions A relationship will be established between each "jurisdiction" Organization and the County Organization. From a dashboard in each jurisdiction's Incident / Event Response room template, a jurisdiction can:

Refer / escalate an ICS 213 RR (Resource Request) to
the County Share Incident Reports to the County
A dashboard in the County's "Daily Operations Room" which will display all of the jurisdictions' shared data. This will allow the County to monitor jurisdictions on a daily basis and provide support when needed.

6. Training
For the Statement of Work included here, Veoci recommends the training program described below. Based on the size and complexity of the customer’s operation, additional training needs may be identified throughout the implementation and can be provided using Professional Service hours to tailor and deliver customized training.

End-User Training
Following the delivery of each of the milestones described in the SOW, Veoci will provide two (2) remote end user trainings that cover basic navigation and use of the solution implemented and described in this SOW.

The Veoci Team will develop End-User training material, based on the deliverables of this SOW.

The training sessions will be recorded and the customer will be able to keep these training materials for future reference, If any of the deliverables from the solution get updated or modified after the material has been delivered, it will be the customer's responsibility to keep the material updated as well, to be consistent with the current state of the Veoci solution.

Veoci Administrator Training Sessions
Veoci employs a train-the-trainer framework, so that post-implementation and training, customer Administrators will be empowered to train End Users to use the specific Veoci solutions.

Veoci offers of in-depth, virtual training sessions for administrators. These sessions are designed to provide customerdesignated Administrators with the skills necessary to manage, maintain, and modify the solution and to add processes and methods as needed. sessions are designed to provide customer-designated Administrators with the skills necessary to manage, maintain, and modify the solution and to add processes and methods as needed.

The course(s) listed below are appropriate for this implementation:

Incident Management: Veoci Administrator Training

7. Professional Services for Solution Customizations
Veoci is extremely flexible and can be easily configured and reconfigured to adapt to changing business processes. Veoci Solutions Engineers tailor solutions to meet customers' specific business needs through the use of Professional Service Hours. Professional Service Hours can 95

Page 8 of 13 ends

also be used by customers to finalize their solution at inception in order to have a completed solution that is available for use immediately.
20 hours of professional services are included in this SOW. The customer can direct these hours to be used for:
 Point-and-click customizations to solutions
 Building additional solutions using our point-and-click interface  Creating/updating print templates for Forms, Workflows, and Task Types  Developing custom training material
 Solution design consulting

8. Assumptions & Work Requirements
In addition to any other responsibilities or duties described in this SOW, set forth below is a list of the obligations for which the customer is responsible, and assumptions upon which Veoci has relied in creating this SOW.
 The customer will identify, and make available for the duration of this project, one primary contact to act as Project Lead.
 The Customer Project Lead will brief their project team on Veoci and the customer’s goals and objectives prior to the kick-off call.  The customer holds primary responsibility for data quality of sufficient standards to achieve customer goals.
 Customer data for migration must be in the format specified either in the Deliverable or as detailed by the Veoci implementation team following initial requirements gathering. Data to be migrated must be ready for upload, in addition to being in the specified format (CSV file, PDF, etc.). For example, if importing into a field that accepts blue/red/green as attributes, entries can not include lime green.

The customer will cooperate in good faith with Veoci in its performance of this SOW by:
 Allocating sufficient resources and time to perform any tasks reasonably necessary to enable Veoci to perform its obligations under the SOW.  Delivering in a timely manner any customer collateral and other obligations required for each Milestone included in this SOW.
 Responding in a timely manner to Veoci’s inquiries related to the SOW.  Actively participating in scheduled project meetings, completing accurate and timely information, data and feedback all as reasonably required.

Integration Requirements
To successfully complete an integration, Veoci will require assistance and cooperation from the customer as well as the integrating vendor. Integrations often require access credentials, sample data, and testing before being completed.

Veoci exposes a REST API that can be used by other systems to send data to Veoci or query data from Veoci. Use of this API is included in this SOW.

Veoci also has a console for configuring connections with APIs exposed by other systems - specifically ones that are accessible via the web and output either XML or JSON data. An unlimited number of these connections can be established by the customer.

Veoci can also connect with a web-facing SFTP site or an AWS S3 bucket to run a scheduled import of either CSV or XLSX data. This functionality is not self-service and needs to be configured by the Veoci team at an additional cost.
96

Page 9 of 13 ends

For new integrations that Veoci has not yet implemented, Veoci will work to implement a direct integration through REST API call to this system. Veoci’s API integrations are highly flexible and can be implemented easily; however successful integration is dependent on the application that is being integrated. Veoci will work with the customer and the application vendor to implement the integration to accomplish the goals specified by the vendor wherever possible. Should an API integration not be feasible other options such as flat file upload via a SFTP or S3 bucket can be explored as well.

Functionality related to non-standard integrations may require additional configuration by the Veoci team, which will be provided at an additional cost.

Data Migration Requirements
Customer data for migration must be in the format specified either in the Deliverable or as detailed by the Veoci implementation team following initial requirements gathering. Data to be migrated must also be ready for upload, in addition to being in the specified format (CSV file, xlxs). For example, if importing into a field that accepts blue/red/green as attributes, entries can not include lime green.

Legacy data provided to Veoci in a format other than that agreed upon will create an error in the system and not allow it to be uploaded. Veoci will not correct data errors, thus it is vital that the data provided to Veoci be in the exact format as agreed upon.

9. Veoci Solutions Building Blocks
Veoci tools are the elements that provide specific functionalities within Veoci solutions. During implementation, Veoci Solution Engineers select the tool or combination of tools to configure the solution based on the customer’s goals, existing processes, and available data.

Alerts, Notifications, and Check-Ins
Alerts, Notifications, and Check-ins can be configured for individuals or groups based on actions or conditions. Notifications include phone calls, conference calls, text/SMS, email, and mobile app Alerts. Additional costs are associated with configuring and on-going fees for conference calls.

Custom Actions
Custom Actions allow Administrators to define additional events to be triggered after someone creates or updates a Form Entry, Workflow, or Task. Dashboards Dashboards provide a visual summary of key information and metrics in one easily accessed location.

Forms
Forms are used to collect data in a structured format. Forms also serve as databases, often replacing multiple spreadsheets, and as ways to populate fields on Maps and Dashboards. Veoci provides considerable flexibility to configure fields included in Forms, and entries can include text, numbers, email addresses, selection options, date, and time fields.

Lists
Lists allow individual members to be grouped together for common activities or notifications.

Members can be both customer employees and outside stakeholders, such as local emergency responders. A robust system of permissions manages individual member access to ensure appropriate and secure access to the Veoci platform.

Mapping Capabilities
97

Page 10 of 13 ends

Veoci provides its own comprehensive mapping program and intuitive, real-time integration with other GIS software. Users can enable or disable layers of location data coming from Veoci content such as Forms, Workflows, and Tasks. Users can also add annotations (i.e., points, lines, polygons) and labels to Maps and enable or disable GIS layers.

Plans
Plans are repeatable Room Templates that can be launched when a Plan is triggered. Plans can be used to instantly create Rooms that are prepopulated with Dashboards, Workflows, contact lists, required documents, Tasks, and other Templates.

Print Views
Print Views are customized views of a Form or Workflow entry that can be printed, emailed, exported to PDF, or added to Veoci Dashboards to provide situational awareness. Many Veoci solutions include default Print Views, especially those needed for regulatory reporting or compliance. Customized Print Views can be created as needed. Print Templates are designed using a WYSIWYG or HTML.

Reports
Reports are created to capture and present information to stakeholders, both within and outside of Veoci. Reports are exported from Veoci using PDF print templates. Summary information from Reports is often displayed on Dashboards.

Rooms
A Room is a collaboration space in Veoci that contains tools for gathering information and making decisions. Rooms can have cascading or descendant Rooms—known as Side Rooms. Almost all end User activity occurs in a Room or Side Room.

Saved Views
Saved Views are customized views of Form or Workflow entries that are configured to show specific information in a distinct format. Saved Views are used to display information grouped by defined criteria. Saved Views can be created for Forms, Workflows, and Tasks.

Tasks
Tasks assign a specific responsibility or action to an individual. Tasks can be configured to include structured work requests, categories of Tasks, priorities, and Map locations.

Workflows
Workflows are used to automate work processes. The customer defines the people, data, and process involved, and Veoci manages the flow of information and provides transparency, reminders, escalations, and Reports. Workflows also include automatic conditional steps and assignments for those situations when processes follow alternative flows.

Note: County will determine training schedule and staffing required.

Terms and Conditions

1. Independent Contractor:

Participant is an independent contractor, working under his/her own supervision and direction and is not a representative or employee of County.

2. Mutual Hold Harmless:
98

Page 11 of 13 ends

It is agreed that Participant shall defend, save harmless and indemnify County, its officers and employees from any and all claims for injuries or damage to persons and/or property which arise out of the terms and conditions of this MOU and which result from the negligent acts or omissions of Participant its officers and/or employees.

It is further agreed that County shall defend, save harmless and indemnify Participant, its officers and employees from any and all claims for injuries or damage to persons and/or property which arise out of the terms and conditions of this MOU and which result from the negligent acts or omissions of County, its officers and/or employees.

In the event of concurrent negligence of Participant, its officers and/or employees, and County, its officers and/or employees then the liability for any and all claims for injuries or damages to persons and/or property which arise out of the terms and conditions of this MOU shall be apportioned under principles of comparative negligence as established presently by California law, or as may be hereafter modified.

This indemnity provision survives this MOU.

3. Term:

This MOU shall be in effect from date of execution through August 31, 2027.

4. Insurance:

Each party shall be responsible for its own actions or omissions and those of its employees. Each party shall be individually responsible for providing insurance coverage in accordance with its existing employee and volunteer policies and practices. Each party shall maintain its own equipment in safe and operational condition. Evidence of such insurance will be provided to the other party upon request.

5. Compensation:

All compensation owed by Participant shall be paid to County. County shall pay Veoci, Inc. a total of $136,552.00 over the term of the contract. Participant shall pay $15,737.44 to County upon receipt of invoice from County for year one. Participant shall pay County $16,524.31 for year two and $17,350.53 for year three. Payments are due Net 30 upon receipt of invoices from Butte County OEM for year one.

6. Confidentiality:

Each party agrees to maintain the confidentiality of all related records and information of the other party pursuant to all statutory laws relating to privacy and confidentiality that currently exist or exist at any time during the term of this MOU.

7. Termination:

This MOU shall terminate upon expiration of the Veoci Inc. contract. If Participant wishes to terminate this MOU prior to expiration of the Veoci Inc. contract, Participant shall do so by providing written notice within 90 days of the annual renewal of the Veoci Inc. contract (September 1, 2025 and September 1, 2026).

8. ALTERATION OF TERMS:

The body of this MOU fully expresses all understandings of the parties concerning all matters covered and shall constitute the total MOU. No addition to, or alteration of, the terms of this MOU whether by written or verbal understanding of the parties, their officers, agents or employees shall be valid unless made in the form of written amendment to this MOU which is formally approved and executed by all parties.

9. NOTICES:
99

Page 12 of 13 ends

All notices, claims, correspondence, reports and/or statements authorized or required by this MOU shall be addressed as follows:

County:

Butte County Office of Emergency Management
25 County Center Drive, Suite213
Oroville, CA 95965
(530)552-3330
[email protected]
Participant:

Town of Paradise
5555 Skyway
Paradise, Ca 95969

10. DISPUTE RESOLUTION:

Any disagreements that may occur shall be resolved at the lowest possible level within County and Participant and with a cooperative spirit. County and Participant will designate individuals who are responsible to resolve issues in a timely fashion regarding this MOU. Should agreement not be reached between County and Participant after working through the process already prescribed, then the matter should go for discussion and consideration between the Directors of each agency.

11. APPLICABLE LAW AND FORUM:

This MOU shall be construed and interpreted according to California law and any action to enforce the terms of this MOU for the breach thereof shall be brought and tried in the County of Butte.

12. INTEGRATION/ENTIRE AGREEMENT OF PARTIES:

This MOU constitutes the entire agreement between the Parties and supersedes all prior discussions, negotiations, and agreements, whether oral or written. This MOU may be amended or modified only by a written instrument executed by both Parties.

13. NO DELEGATION OR ASSIGNMENT:

Contractor shall not delegate, transfer or assign its duties or rights under this MOU, either in whole or in part, directly or indirectly, by acquisition, asset sale, merger, change of control, operation of law or otherwise, without the prior written consent of County and any prohibited delegation or assignment shall render the contract in breach. Upon consent to any delegation, transfer or assignment, the parties will enter into an amendment to reflect the transfer and successor to Contractor.

14. ENTIRE AGREEMENT:

This MOU and the listed exhibits represent the entire undertaking between the parties. This MOU may be signed in counterparts, each of which shall be deemed to be an original, but all of which, taken together, shall constitute one and the same MOU.

15. SIGNATURE AUTHORITY:

Each party has the full power and authority to enter into and perform this MOU, and the person signing this MOU on behalf of each Party has been properly authorized and empowered to enter into this MOU.

16. ELECTRONIC SIGNATURES:

Each Party of this agreement agrees to the use of electronic signatures, such as digital signatures that meet the requirements of the California Uniform Electronic Transactions Act ((“CUETA”) Cal. Civ. Code §§ 1633.1 to 1633.17), for executing this agreement. The Parties 100

Page 13 of 13 ends

further agree that the electronic signatures of the Parties included in this agreement are intended to authenticate this writing and to have the same force and effect as manual signatures.

Electronic signature means an electronic sound, symbol, or process attached to or logically associated with an electronic record and executed or adopted by a person with the intent to sign the electronic record pursuant to the CUETA as amended from time to time. The CUETA authorizes use of an electronic signature for transactions and contracts among Parties in California, including a government agency. Digital signature means an electronic identifier, created by computer, intended by the party using it to have the same force and effect as the use of a manual signature, and shall be reasonably relied upon by the Parties. For purposes of this section, a digital signature is a type of "electronic signature" as defined in subdivision (i) of Section 1633.2 of the Civil Code.

IN WITNESS WHEREOF, the parties hereto have caused this MOU to be executed by their duly authorized representatives as of the dates opposite the signatures.

Butte County Office of
Emergency Management Contractor
___________________________________ _________________________________ Katie Simmons Date Name Date
County Executing Authority
____________________________________
Sarah MacArthur Date
Deputy Director, General Services Department
Reviewed for Contract Policy Compliance
____________________________________
General Services Contracts Division Date
Approved as to Form
_____________________________________
Brad J. Stephens Date
Butte County Counsel
101

Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 6(c)
ORIGINATED BY: Colette Curtis, Recovery and Economic
Development Director
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Emergency Warning Sirens Guidelines

LONG TERM
RECOVERY PLAN:

Yes
COUNCIL ACTION REQUESTED:

1. Consider reviewing and approving the Town of Paradise Emergency Warning Sirens Guidelines. (ROLL CALL VOTE)
Background:

Following the 2018 Camp Fire, the Paradise community expressed the desire for a redundant warning system to be used in emergencies. The Long-Term Community Recovery Plan, adopted in June 2019, identified an emergency notification system as one of the top priorities in recovery.

Of the 1,111 comments received during the public engagement process for the Long-Term Community Recovery Plan, 1,068 were in favor of the system representing a 96% approval from those commenting.

Funded through two FEMA Hazard Mitigation Grant Program projects, one for design/scope and one for construction, the Emergency Warning Sirens, consisting of 21 siren towers throughout town, are being installed. The system is currently 95% complete as 20 of 21 siren towers are fully functional. Additional in-home components and related equipment are being installed and distribution is expected to occur this winter.

Analysis:

The operational guidelines were previously brought before Town Council for discussion and input.

Town staff have taken that information and revised the operational guidelines. The attached guidelines are designed to be a guide to Town officials in the operation of the Emergency Warning Sirens in the event of an actual evacuation.

The Emergency Warning Sirens are part of the overall emergency notification strategy known as “Alert Paradise”. The purpose of the Emergency Warning Sirens is to provide a redundant warning system for residents and visitors in Paradise of potential or emergent hazards that threaten life and property. The Emergency Warning Sirens are designed to work in coordination with existing emergency notification systems and processes and will be the last step in alerting residents of emergencies which require evacuation.
102
Financial Impact:

The approval of this document has no impact on the General Fund. The Hazard Mitigation Grant Program (HMGP) though FEMA has provided funding for this project, which has previously been approved and accepted by Council. Additional funds for the Town’s 25% match requirement are being provided through a grant from HCD.

Attachments:

1. Attachment A – Town of Paradise Emergency Warning System Guidelines 103
Town of Paradise Emergency Warning Sirens Guidelines
Working together to rebuild a thriving community.

The Town of Paradise Emergency Warning System (EWS) consists of twenty-one siren towers located within the town limits of Paradise, California. This system will be known as the Emergency Warning Sirens (EWS) and is part of the overall emergency notification strategy known as “Alert Paradise”. The purpose of the EWS is to provide a last step, redundant warning system for residents and visitors in Paradise of potential or emergent hazards that threaten life and property. The EWS is designed to work in coordination with existing emergency notification systems and processes and to be the highest level of alert of emergencies.

This document is intended to guide Town Officials in the operation of the Emergency Warning Sirens.

Sections:

Section 1. Siren Locations
Section 2. Activation
Section 3. Siren Tones and Voice Commands
Section 4. Testing Procedure
Section 5. Maps of Tower Activation by Evacuation Scenario Section 1: Siren Locations
Siren locations were chosen after analysis of the topography and geography of the Paradise ridge. The 21 sirens are located in public rights of way, or on public property, with the goal of providing audible warnings within Paradise Town limits. The tower locations are listed in table 1 below.

Eight siren locations will also have traffic cameras installed. These cameras are for Town of Paradise internal use only to monitor traffic and conditions during emergencies. Cameras with visibility to private property will have active private property permanently masked from view of the camera.

The traffic cameras will allow access to direct live-feed video to Town of Paradise emergency personnel..

This video is not recorded by the Town. Upon a reasonable belief that some video footage may hold evidentiary value, the Town Manager or his/her designee may endeavor to obtain that video footage from the camera itself. In the event that video footage with evidentiary value is obtained, it shall be retained pursuant to Government Code section 34090 and shared to the appropriate party or agency. 104
Town of Paradise Emergency Warning Sirens Guidelines
Working together to rebuild a thriving community.

Table 1: Siren Tower Locations
SITE DESCRIPTION LATITUDE LONGITUDE Camera
1 Police Department – TOP Property 39°45'15.54"N 121°37'27.86"W 2 Pearson & Clark ROW 39°45'7.77"N 121°36'23.77"W Yes
3 Maxwell & Fairview ROW 39°45'47.99"N 121°36'44.46"W
4 Sawmill & Nunneley ROW 39°45'21.00"N 121°35'20.80"W
5 Clark & Bille ROW 39°46'17.52"N 121°35'47.31"W Yes
6 Paradise Town Hall TOP Property 39°44'57.10"N 121°38'0.70"W Yes 7 Russell Drive & Skyway ROW 39°44'42.60"N 121°39'8.53"W Yes 8 Neal & Grinding Rock ROW 39°43'57.97"N 121°39'4.61"W
9 Foster & Apple ROW 39°43'59.55"N 121°38'10.12"W
10 American Way TOP Property 39°44'12.60"N 121°36'36.76"W Yes 11 Bennett & S. Libby ROW 39°44'15.75"N 121°35'38.06"W
12 Pentz & Water Tower ROW 39°44'3.05"N 121°34'24.84"W
13 Pentz & Ely ROW 39°46'36.30"N 121°34'47.03"W Yes
14 Crestmore & Rose ROW 39°45'38.00"N 121°38'18.70"W
15 Bille & West Wagstaff ROW 39°46'13.42"N 121°37'48.39"W 16 Clark & YSK Trail ROW 39°47'45.56"N 121°35'6.62"W Yes 17 Pentz & Peach ROW 39°45'30.40"N 121°34'20.90"W
18 Pentz & Pearson ROW 39°44'52.00"N 121°34'23.30"W Yes 19 Rocky Ln. & YSK Trail ROW 39°46'53.51"N 121°35'53.68"W 20 Gregory & Waggoner ROW 39°46'44.00"N 121°36'47.90"W
21 Roe & Scottwood ROW 39°44'28.26"N 121°37'18.28"W
105
Town of Paradise Emergency Warning Sirens Guidelines
Working together to rebuild a thriving community.

The most proximal areas to the towers can expect ~90db emitting from the towers, down to ~60db outside Town limits. The system has been tested and has confirmed volume levels of +110db at 30 meters from the towers and +90db at 400 meters. This system is designed to be audible for residents and visitors who are outdoors when the warning (siren tone or voice command) is given. The audibility levels of the system can vary due to the environment when activated. The system is designed to be one part of our emergency warning system and the last tool to be utilized in an actual emergency.

EWS Siren Tower EWS Siren Tower w/Camera
106
Town of Paradise Emergency Warning Sirens Guidelines
Working together to rebuild a thriving community.

Section 2: Activation
Standardized signals for Emergency warning devices have been established by the Federal Emergency Management Agency (FEMA). Additional information on policies and guidelines for Emergency Warning Systems can be found in the FEMS CPG 1-17 Outdoor Warning Systems Guide and the 2019 CA Alert Warning Guidelines. These standard guidelines have been incorporated in this document.

EWS Activation Procedure
In the event of an evacuation order being issued, the Emergency Warning Sirens will be activated at the direction of the Paradise Police Chief or their designee. The Police Chief or their designee will work in partnership with other emergency personnel to make the following two determinations:

1. Zone Determinations: Which evacuation zone(s) will be issued an evacuation warning and which evacuation zone(s) will be issued an evacuation order.

2. Scenario Determination: Which of the 8 Evacuation Scenarios best reflect the current emergency and should be activated by dispatch.

The activation process will be initiated by Town of Paradise Police Department Dispatch Center once approval has been granted:
• Level 1 EWS Activation: If 1,2 or 3 zones are ordered for evacuation, The EWS towers preidentified and coordinated with the selected Town Evacuation scenario would be activated. • Level 2 EWS Activation: If 4 or more zones are ordered for evacuation, all towers would be activated.

All Evacuation scenarios will be pre-programmed into the EWS control system for quick activation in the event of an emergency. Scenario maps provided in section 6.

Scenario 1 – Butte Creek Canyon
Evacuation Zones 1 and 4
Towers 3, 14, 15, 16, 19, 20
Scenario 2 – Lower Skyway/Neal Road
Evacuation Zones 9, 10 and 11
Towers 1, 6, 7, 8, 9, 21
Scenario 3 – Butte Valley/Lower Clark
Evacuation Zones 11, 12, and 13
Towers 2, 6, 9, 10, 11, 12, 18, 21
Scenario 4 – West Branch/Lower Pentz
Evacuation Zones 8, 13, and 14
Towers 11, 12, 17, 18,
Scenario 5 – West Branch/Concow
Evacuation Zones 3, 8 and 14
Towers 12, 13, 16, 17, 18,
Scenario 6 – Magalia
Evacuation Zones 1, 2 and 3
Towers 5, 13, 15, 16, 19, 20
Scenario 7 – Central Paradise
Evacuation Zones 5, 6 and 7
Towers 1, 2, 3, 4, 5, 17, 18
Scenario 8 – All Towers/All Zones (no
map included)
Evacuation Zones 1-14
Towers 1-21
107
Town of Paradise Emergency Warning Sirens Guidelines
Working together to rebuild a thriving community.

The process flow is shown visually below:

The Emergency Warning Sirens are only intended to be activated in a true emergency in which an evacuation has been ordered. No towers will be activated for evacuation warning(s). Additional notification and information channels are to be used prior to and in tandem with the siren towers. This emergency communication framework is known as Alert Paradise. The activation of the EWS is intended to indicate to all residents and visitors to seek further emergency information through radio, television, social media, or other channels.

Depending on the emergency, different levels of public notification will be appropriate. Activation of the Emergency Warning Sirens will be used for evacuation orders. The following table illustrates the hierarchy of notification channels within Alert Paradise. Once a notification channel is activated, all those below it in the hierarchy should also be utilized.

Alert Paradise Notification Hierarchy
108
Town of Paradise Emergency Warning Sirens Guidelines
Working together to rebuild a thriving community.

Section 3: Siren Tones and Voice Commands
Any activation of the EWS will include both siren tone and voice command. It is understood that sirens may be audible for a distance beyond the immediate area for which the notification is intended, and clear instruction through the voice commands and on other communication channels will be important for the system to be used effectively.

Emergency Activation Siren and Voice
Immediate Evacuation Orders will prompt the activation of the Emergency Warning Sirens. A 1-minutelong siren tone will indicate residents should evacuate immediately. The siren tone will then be followed by a Voice Command telling residents to evacuate. The default voice command will be “A mandatory evacuation order has been issued” The protocol will be as follows:

Siren Tone for a 1-minute duration
Voice Command:

Siren Tone for a 1-minute duration
This siren cycle will repeat until suspended by order of the Police Chief.

Section 4: Testing Procedures
The EWS will be tested both internally and externally. The EWS towers have built in internal testing that occur regularly and additional Internal-only tests will be performed periodically and will be done silently to test functionality but will not be audible to the public.

Audible tests will be performed monthly, on the 15th of each month at 12:00 pm. The public will be notified of these tests in advance, with press releases, social media posts, website information, and Code Red notifications sent prior to testing. The testing protocol will be as follows:

Voice Command: This is a test of the Paradise Emergency Warning Sirens Siren Tone for a 30-second duration
Voice Command: This was a test of the Paradise Emergency Warning Sirens. 109
Town of Paradise Emergency Warning Sirens Guidelines
Working together to rebuild a thriving community.

Section 5: Maps of Tower Activation by Evacuation Scenario 110

PARADISE

BUTTE CREEK
CANYON

MAGALIA
SKYWAY
191
PE-380
MA-287
CSE-361
MA-290
MA-289
MA-291
BV-466
CSE-365
BV-465
CSE-368
BV-464
MA-288
MA-292
MA-286
TOP-01
PE-381
TOP-10
TOP-11
BV-463
TOP-13
TOP-14
TOP-02
TOP-03
TOP-04
TOP-05 TOP-06 TOP-07
TOP-08
TOP-09
CON-507
BV-461
BV-462
CON-509
FR-273
CON-503
CON-508
CON-501
TOP-12
CSE-364
CSE-367
CSE-363
SKYWAY

CLARK RD

PENTZ RD

NEAL RD
0 0.5 1
Miles
Town of Paradise
Evacuation Zones
Scenario Fire Threat
Anticipated Resource Ingress
Route
Anticipated Egress Route
Potential One-Way Evacuation
Egress Route
LEGEND
Emergency Evacuation Review
Scenario 1 Butte Creek Canyon
Default Folder: J:\Paradise-SA-21111-TMP (EDA) TO #2\Graphics and Visualizations\GIS\Paradise TMP TO2 # TOP Emergency Warning Sirens
Towers 3, 14, 15, 16, 19, & 20
3 14
15 16
19 20
111

PARADISE

BUTTE CREEK
CANYON

MAGALIA
SKYWAY
191
PE-380
MA-287
CSE-361
MA-290
MA-289
MA-291
BV-466
CSE-365
BV-465
CSE-368
BV-464
MA-288
MA-292
MA-286
TOP-01
PE-381
TOP-10
TOP-11
BV-463
TOP-13
TOP-14
TOP-02
TOP-03
TOP-04
TOP-05 TOP-06 TOP-07
TOP-08
TOP-09
CON-507
BV-461
BV-462
CON-509
FR-273
CON-503
CON-508
CON-501
TOP-12
CSE-364
CSE-367
CSE-363
SKYWAY

CLARK RD

PENTZ RD

NEAL RD
0 0.5 1
Miles
Town of Paradise
Evacuation Zones
Scenario Fire Threat
Anticipated Resource Ingress
Route
Anticipated Egress Route
Potential One-Way Evacuation
Egress Route
LEGEND
Emergency Evacuation Review
Scenario 2 Lower Skyway/Neal Road
Default Folder: J:\Paradise-SA-21111-TMP (EDA) TO #2\Graphics and Visualizations\GIS\Paradise TMP TO2 # TOP Emergency Warning Sirens
Towers 1, 6, 7, 8, 9, & 21
1 6
7 8 9
21 112

PARADISE

BUTTE CREEK
CANYON

MAGALIA
SKYWAY
191
PE-380
MA-287
CSE-361
MA-290
MA-289
MA-291
BV-466
CSE-365
BV-465
CSE-368
BV-464
MA-288
MA-292
MA-286
TOP-01
PE-381
TOP-10
TOP-11
BV-463
TOP-13
TOP-14
TOP-02
TOP-03
TOP-04
TOP-05 TOP-06 TOP-07
TOP-08
TOP-09
CON-507
BV-461
BV-462
CON-509
FR-273
CON-503
CON-508
CON-501
TOP-12
CSE-364
CSE-367
CSE-363
SKYWAY

CLARK RD

PENTZ RD

NEAL RD
0 0.5 1
Miles
Town of Paradise
Evacuation Zones
Scenario Fire Threat
Anticipated Resource Ingress
Route
Anticipated Egress Route
Potential One-Way Evacuation
Egress Route
LEGEND
Emergency Evacuation Review
Scenario 3 Butte Valley/Lower Clark
Default Folder: J:\Paradise-SA-21111-TMP (EDA) TO #2\Graphics and Visualizations\GIS\Paradise TMP TO2 # TOP Emergency Warning Sirens
Towers 2, 6, 9, 10, 11, 12, 18 & 21
2 6
9 21
10 11
18 12
113

PARADISE

BUTTE CREEK
CANYON

MAGALIA
SKYWAY
191
PE-380
MA-287
CSE-361
MA-290
MA-289
MA-291
BV-466
CSE-365
BV-465
CSE-368
BV-464
MA-288
MA-292
MA-286
TOP-01
PE-381
TOP-10
TOP-11
BV-463
TOP-13
TOP-14
TOP-02
TOP-03
TOP-04
TOP-05 TOP-06 TOP-07
TOP-08
TOP-09
CON-507
BV-461
BV-462
CON-509
FR-273
CON-503
CON-508
CON-501
TOP-12
CSE-364
CSE-367
CSE-363
SKYWAY

CLARK RD

PENTZ RD

NEAL RD
0 0.5 1
Miles
Town of Paradise
Evacuation Zones
Scenario Fire Threat
Anticipated Resource Ingress
Route
Anticipated Egress Route
Potential One-Way Evacuation
Egress Route
LEGEND
Emergency Evacuation Review
Scenario 4 West Branch/Lower Pentz
Default Folder: J:\Paradise-SA-21111-TMP (EDA) TO #2\Graphics and Visualizations\GIS\Paradise TMP TO2 # TOP Emergency Warning Sirens
Towers 11, 12, 17, & 18
11 18
12 17
114

PARADISE

BUTTE CREEK
CANYON

MAGALIA
SKYWAY
191
PE-380
MA-287
CSE-361
MA-290
MA-289
MA-291
BV-466
CSE-365
BV-465
CSE-368
BV-464
MA-288
MA-292
MA-286
TOP-01
PE-381
TOP-10
TOP-11
BV-463
TOP-13
TOP-14
TOP-02
TOP-03
TOP-04
TOP-05 TOP-06 TOP-07
TOP-08
TOP-09
CON-507
BV-461
BV-462
CON-509
FR-273
CON-503
CON-508
CON-501
TOP-12
CSE-364
CSE-367
CSE-363
SKYWAY

CLARK RD

PENTZ RD

NEAL RD
0 0.5 1
Miles
Town of Paradise
Evacuation Zones
Scenario Fire Threat
Anticipated Resource Ingress
Route
Anticipated Egress Route
Potential One-Way Evacuation
Egress Route
LEGEND
Emergency Evacuation Review
Scenario 5 West Branch/Concow
Default Folder: J:\Paradise-SA-21111-TMP (EDA) TO #2\Graphics and Visualizations\GIS\Paradise TMP TO2 # TOP Emergency Warning Sirens
Towers 12, 13, 16, 17 & 18
13 17
18 12
16 115

PARADISE

BUTTE CREEK
CANYON

MAGALIA
SKYWAY
191
PE-380
MA-287
CSE-361
MA-290
MA-289
MA-291
BV-466
CSE-365
BV-465
CSE-368
BV-464
MA-288
MA-292
MA-286
TOP-01
PE-381
TOP-10
TOP-11
BV-463
TOP-13
TOP-14
TOP-02
TOP-03
TOP-04
TOP-05 TOP-06 TOP-07
TOP-08
TOP-09
CON-507
BV-461
BV-462
CON-509
FR-273
CON-503
CON-508
CON-501
TOP-12
CSE-364
CSE-367
CSE-363
SKYWAY

CLARK RD

PENTZ RD

NEAL RD
0 0.5 1
Miles
Town of Paradise
Evacuation Zones
Scenario Fire Threat
Anticipated Resource Ingress
Route
Anticipated Egress Route
Potential One-Way Evacuation
Egress Route
LEGEND
Emergency Evacuation Review
Scenario 6 Magalia
Default Folder: J:\Paradise-SA-21111-TMP (EDA) TO #2\Graphics and Visualizations\GIS\Paradise TMP TO2 # TOP Emergency Warning Sirens
Towers 5, 13, 15, 16, 19, & 20
16 13
15 19
20 5
116

PARADISE

BUTTE CREEK
CANYON

MAGALIA
SKYWAY
191
PE-380
MA-287
CSE-361
MA-290
MA-289
MA-291
BV-466
CSE-365
BV-465
CSE-368
BV-464
MA-288
MA-292
MA-286
TOP-01
PE-381
TOP-10
TOP-11
BV-463
TOP-13
TOP-14
TOP-02
TOP-03
TOP-04
TOP-05 TOP-06 TOP-07
TOP-08
TOP-09
CON-507
BV-461
BV-462
CON-509
FR-273
CON-503
CON-508
CON-501
TOP-12
CSE-364
CSE-367
CSE-363
SKYWAY

CLARK RD

PENTZ RD

NEAL RD
0 0.5 1
Miles
Town of Paradise
Evacuation Zones
Scenario Fire Threat
Anticipated Resource Ingress
Route
Anticipated Egress Route
Potential One-Way Evacuation
Egress Route
LEGEND
Emergency Evacuation Review
Scenario 7 Central Paradise
Default Folder: J:\Paradise-SA-21111-TMP (EDA) TO #2\Graphics and Visualizations\GIS\Paradise TMP TO2 # TOP Emergency Warning Sirens
Towers 1, 2, 3, 4, 5, 17 & 18
5 2
18 1
3 4 17
117

Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 6(d)
ORIGINATED BY: Susan Hartman, Community Development Director – Planning & Wastewater
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Zoning Recommendations for the CB Zoning District

LONG TERM
RECOVERY PLAN:

Yes – Tier 2 Economic Development Strategy & Walkable
Downtown
COUNCIL ACTION REQUESTED:

1. Provide staff with consensus on proposed standards for zoning amendments in the Downtown to present for adoption at a future council meeting, or,

2. Provide alternative direction to Town staff.

Background:

At the April 9, 2024 Town Council meeting, the Town Council requested a future agenda item, scheduled for a special council meeting on April 22, 2024, to discuss preserving the vision for the Town’s commercial downtown core. On April 22, 2024, the Town Council conducted a public hearing at a special council meeting to discuss the zoning in the downtown and the potential impacts of the continued construction of residential land uses on the Town’s vision for a revitalized and walkable commercial downtown district. At the conclusion of the hearing, the Town Council gave direction to staff to prepare an urgency ordinance for a moratorium on residential-type land uses in the Central Business (CB) Zoning District to be brought back to the regularly scheduled May 14, 2024 Council meeting.

On May 14, 2024, the Town Council adopted Ordinance No. 635 establishing a 45-day moratorium relating to the establishment of single-family, two-family, and multi-family residences within the entire Central Business (CB) zoning district. Additionally, Council authorized staff to enter into an agreement with Urban Design Associates (UDA) for an initial assessment of downtown Paradise to refine the area included in the downtown urgency ordinance. UDA reviewed the current conditions with staff and provided an estimation on the amount of commercial space appropriate for a walkable downtown that can be supported by the existing and projected population, based on the 2022 Commercial Market Analysis by Economic & Planning Systems, to help refine the area included in the moratorium.

At the June 18, 2024 Council meeting, prior the expiration of the initial 45-day moratorium, Ordinance No. 635 was extended an additional 10 months and 15 days to allow for a larger Phase II downtown strategy document from UDA that would serve as a conceptual master plan with recommendations for permanent zoning amendments to be brought back to the Council for consideration. In addition, the boundary of the housing moratorium was reduced to a more focused area encompassing primarily the southern half of the Central Business Zoning District (outlined in red below).
118
Current boundary of the housing moratorium under extended Urgency Ordinance No. 635:

Analysis:

Recovery and Economic Development Director Colette Curtis and Community Development Director Susan Hartman have been working with Barry Long and Rebecca Lefkowitz of UDA as they provided additional planning support by coordinating an updated high-level market analysis, providing a conceptual plan for the future of downtown, creating architectural perspective illustrations, and providing zoning recommendations for potential land use changes in the Central Business Zoning District focused on the area affected by the moratorium.

Outreach
Shortly after the June 18, 2024 Council meeting, where the urgency ordinance was extended, UDA began working on the Phase II conceptual plan for the future of downtown. This involved mapping key metrics for the downtown, utilizing information provided by Town staff, to identify areas of opportunity based on current vacancy as well as mapping current and former land uses in the downtown and conducting multiple listening sessions. UDA gathered feedback from community members, council members, and stakeholders between August and September 2024.

An in-person community workshop was held on Saturday, August 10, 2024, at the Paradise Community Park to solicit feedback from residents on proposed infill uses, types of retail businesses they’d like to see, preferred building styles, and what their priorities for the downtown area are. For those who were unable to attend the in-person workshop, an online survey with like questions was launched in September which had 550 respondents. 119
Feedback collected from both the drop-in session and the online survey is summarized below:

Question In-Person Responses (51) Online Responses (550) Paradise resident? Yes – 73% Yes – 77%
Desired types of uses in the
Downtown? (Top 5 listed)
1) Live/work (2-story)
2) Arts & Culture Event
Space
3) Food Truck Clusters
4) Bed & Breakfast
5) Open Air Farmers
Markets
1) Open Air Farmers
Markets
2) Food Truck Clusters
3) Arts & Culture Event
Spaces
4) Cultural Exhibits &
Museums
5) Sports & Health Clubs
Desired types of retail in the
Downtown? (Top 5 listed)
1) Restaurants
2) Ice Cream/Soda Shop
3) Brew Pubs
4) Coffee Shops
5) Bakeries
1) Restaurants
2) Ice Cream/Soda Shop
3) Bakeries
4) Coffee Shops
5) Brew Pubs
Where would you like to see
things happen? (opportunity
areas)
1) Fir Street / Skyway
2) Almond St / Fir Street
1) Almond St / Fir Street
2) Fir Street / Skyway
Maximum building height? 2-story 2-story
What type of building? (Free
standing, attached, or strip
mall)
Free standing Free standing
What type of architectural
style?
Main street style (like
downtown Chico)
Main street style (like
downtown Chico)
What mix of uses?
(Horizontal, vertical, or no
mixed use)
Vertical mixed use
(residential above
commercial)
No mixed use (no housing,
only commercial uses)
Additional events in the
Downtown?
1) Christmas lighted
truck parade
2) More Johnny
Appleseed themed
events
3) More parades
1) Christmas lighted
truck parade
2) Longer seasons for
events (into the cooler
seasons)
3) Art festivals
What are your priorities for
Downtown?
1) More destination
shops for visitors
2) Walkable streets
3) Bistros, places to
hang out, cocktails,
and outdoor dining
1) Bistros, places to
hang out, cocktails,
and outdoor dining
2) Shade and trees
3) Walkable streets
Commercial Market Study Report
The attached commercial market analysis was completed in October 2024 from Peloton Research and Economics. This market analysis aimed to estimate rebuilding timelines and project what the correlating demand for commercial uses would be, in approximate square feet of business space, and additionally determine how much of that square footage could be supported in the downtown.

Generally, every 1,000 residents help support approximately 30,000 to 45,000 square feet of commercial uses. With over 10,500 current residents, the 331,000 square feet of post-fire occupied retail space identified in the 2022 market study by EPS has a population base to support it. In the updated Peloton study, it is estimated that by 2060 the projected residential growth of 120
Paradise could support an additional 410,000 square feet of commercial space with 190,000 square feet of that projected for the downtown.

Utilizing that market analysis data and comparing it to the 33 acres of undeveloped land available in the downtown, which has capacity to accommodate more than 200,000 square feet of commercial space, shows that the downtown has the ability to support the current and future projected commercial square footage needs with a large portion of that being located in the walkable downtown core (moratorium area) which in itself currently has 13.61 acres of vacant land.

While the Town continues to recover, Peloton presented some short (2025-2030) and long-term (2030-2060) activation strategies for the downtown and walkable downtown core. In the shortterm, to bring a renewed interest to the downtown and attract local visitors, suggestions for areas around the Fir St/Almond St intersection and the Birch St/Foster Rd intersection included:
 Hosting weekly events such as farmers’ markets, food truck gatherings, and outdoor entertainment.
 Utilize existing street and sidewalk infrastructure to create pedestrian-friendly zones and encourage foot traffic.
 Introducing pop-up retail and temporary community uses to fill vacant spaces, generate excitement and test market demand.

In the long-term, to support sustainable growth and reflecting Paradise as a livable community, the suggestions included:
 Encourage mixed use development with ground-floor retail and upper-floor residential.  Promote public plazas and outdoor seating areas to foster community interaction.  Emphasize pedestrian and cycling infrastructure.

Recommendations
To support the development of the downtown, with a walkable downtown core, UDA and staff analyzed the existing zoning standards and looked for ways to best support the vision of the downtown based on the public’s feedback and the market analysis.  Walkable Downtown Core (WDC) boundaries
Based on feedback from stakeholders and the public, it is recommended that the boundaries of Central Business (CB) District, including the walkable downtown core (WDC), be extended to include the three parcels that used to house the PID corp yard, just north of the Community Park.  Use Recommendations for the CB District
121
Responding to consistent comment from community members about the need to remove obstacles for development, there is a recommendation to make some of the land uses that currently require some level of entitlement (use permit) permitted by right. Those include:
 Body piercing/tattoo shop
 Bed and breakfast
 Club or lounge
 Cocktail lounge
 Commercial recreation (indoor)
 Cultural service
 Daycare facility
 Financial services
 Food sales
 Liquor sales
 Manufacturing (custom)
 Medical offices
 Park and recreation
 Parking facility (public)
 Restaurant
 Uses Recommended to be added to the CB District
Temporary uses can be a good early activator while the market continues to recover and new permanent uses that make the downtown a desirable place to visit are encouraged. Those recommended uses to be added to the CB District include:
 Temporary uses listed in Paradise Municipal Code section 17.32.100 not currently permitted in the CB zone such as:
o Outdoor special sales, outdoor art and craft shows or exhibits, swap meets, farmers markets, flea markets, and parking lot sales.
o Seasonal retail sale or agricultural or horticultural products raised off premises.  Drive-in theater/outdoor amphitheater.
 Food truck vending.
 Uses Recommended to be removed from the CB District
What we heard from the public is that there is not a desire for the following land uses in the downtown:
 Auto repair
 Laundry services
 Any other uses that generate noxious fumes or excessive noise  Use Recommendations for the Walkable Downtown Core (WDC) Similar to the CB zoning district, which encompasses the greater downtown area, there are uses in the WDC recommended to be permitted by right instead of requiring any type of entitlement (use permit). Those include:
 Body piercing/tattoo shop
 Bed and breakfast
 Club or lounge
 Cocktail lounge
 Commercial recreation (indoor)
 Cultural service
 Daycare facility
 Dwelling, accessory (with permitted primary use) *for upper floors only  Financial services
122
 Food sales
 Liquor sales
 Manufacturing (custom)
 Medical offices
 Multiple-family residence *for upper floors only
 Park and recreation
 Parking facility (public)
 Restaurant
 Uses Recommended to be added to the WDC
Mirroring the recommended additions to the greater downtown area, the WDC is also recommended to allow:
 Temporary uses listed in Paradise Municipal Code section 17.32.100 not currently permitted in the CB zone such as:
o Outdoor special sales, outdoor art and craft shows or exhibits, swap meets, farmers markets, flea markets, and parking lot sales.
o Seasonal retail sale or agricultural or horticultural products raised off premises.  Drive-in theater/outdoor amphitheater.
 Food truck vending.
 Uses Recommended to be removed from the WDC
What we heard from the public is that there is not a desire for the following land uses in the WDC:
 Auto repair
 Laundry services
 Any other uses that generate noxious fumes or excessive noise  Dwelling, accessory (with permitted primary use) *on ground floors  Multiple-family residence *on ground floors
 Single-family residence
 Two-family residence
 Development Standard Changes for the CB District & WDC Feedback received from the public and stakeholders about desired building types in the downtown showed a consensus for standalone and/or attached buildings, like traditional Main Streets.

Knowing that there are slope considerations in the downtown as well as the potential desire to build smaller commercial buildings, there is a recommendation to consider reducing the minimum lot widths required in the downtown (measured at the building setback line) from 55 feet to 30 feet, to match the current street frontage requirements, when connected to a sewer system. To reduce the width without the benefit of a sewer connection could pose a hardship for the physical space requirements for installation of a septic system.

Overall, these recommendations are rooted in the belief that these changes can help activate early activity and interest in the downtown as well as support sustained growth in that area with uses the public wants to see and are more attainable to the local business owners.

Financial Impact:

There are no General Fund costs associated with this discussion item beyond what was already budgeted for consultants.

Attachments:
 Commercial Market Opportunity Assessment, Peloton Research + Economics 123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183

Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 6(e)
ORIGINATED BY: Scott E. Huber, Town Attorney
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Town Council Adoption of a Text Amendment to Chapter

2.45 Relating to the Town’s Purchasing Policy

LONG-TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Consider adopting Town of Paradise Urgency Ordinance No. 639, “An Urgency Ordinance of the Town Council of the Town Of Paradise Amending Portions of Chapter 2.45 of the Paradise Municipal Code Relating to the Town’s Purchasing System”; or,

2. Direct an alternative directive to town staff.

Background and Analysis:

Town Staff believes that clarity of the Paradise Municipal Code is necessary for the effective functioning of the Town and for certainty in the procurement process. Town Staff learned of a misunderstanding related to the application of protocol for evaluating proposals and the interplay of federal grant requirements versus the language of the Town Code.

Specifically, language in Section 2.45.010(B) of the Town Code may create a misunderstanding related to the implementation of federal grant guidelines for evaluation of proposals for work that is paid for with federal grant funds. In addition, this modification will clarify that Chapter 2.45 does not apply to the procurement of professional services.

The attached Urgency Ordinance, if approved, will implement the recommended modifications.

Staff recommends the approval of the Urgency Ordinance.

Financial Impact:

The cost for publication of the ordinance summary in the local newspaper will be borne by the Town of Paradise.

Attachments:

Proposed Urgency Ordinance No. 639
184

TOWN OF PARADISE
ORDINANCE NO. 639
1 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 TOWN OF PARADISE
URGENCY ORDINANCE NO. 639

AN URGENCY ORDINANCE OF THE TOWN COUNCIL OF THE
TOWN OF PARADISE AMENDING PORTIONS OF CHAPTER 2.45 OF THE PARADISE MUNICIPAL CODE RELATING TO THE TOWN’S PURCHASING SYSTEM The Town Council of the Town of Paradise does ordain as follows:

Section 1. Emergency Findings.

This Urgency Ordinance is adopted pursuant to California Government Code Section 36934 and shall take effect immediately upon its approval by at least a four-fifths vote of the Town Council. The Council finds that this Ordinance is necessary for the immediate preservation of the public peace, health and safety, based upon facts set forth in this Ordinance. The Council also finds that there is a significant need for clarification of the Town’s purchasing system to plainly outline the method of procurement of goods and services involving federal or state funding, or professional services.

Section 2. Purpose and Policy of Purchasing System
Section 2.45.010 (B) is hereby amended to read as follows, “This chapter shall apply to contracts for the procurement of town supplies and services. It shall apply to every expenditure of public funds irrespective of the source of funds. When the procurement involves the expenditure of federal funds, the procurement shall be conducted in accordance with all applicable 185

TOWN OF PARADISE
ORDINANCE NO. 639
2 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 federal laws and regulations and with the terms/conditions of any grant, gift or bequest consistent with law. In addition, this chapter shall not apply to contracts for professional services.

Section 3. Severability.

If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance. The Town Council hereby declares that it would have passed this Ordinance and every section, subsection, sentence, clause or phrase thereof irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared unconstitutional or invalid.

Section 4. Effective Date and Publication.

This Ordinance shall be and the same is hereby declared to be in full force and effect immediately upon its passage by a fourfifths (4/5) or greater vote. The Town Clerk of the Town of Paradise is authorized and directed to publish a summary of this Ordinance before the expiration of fifteen (15) days after its passage. This Ordinance shall be published once, with the names of the members of the Town Council Members voting for and against it, in the Paradise Post, a newspaper of general circulation published in the Town of Paradise, State of California. A complete copy of this Ordinance is on file with the Town Clerk of the Town 186

TOWN OF PARADISE
ORDINANCE NO. 639
3 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 Council and is available for public inspection and copying during regular business hours in the office of the Town Clerk.

PASSED AND ADOPTED by the Town Council of the Town of Paradise, County of Butte, State of California, on this 12th day of November, 2024 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
____________________________
Ronald Lassonde, Mayor
ATTEST: APPROVED AS TO FORM:
_________________________ ______________________________ Melanie Elvis Scott E. Huber
Town Clerk Town Attorney
187

Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 6(f)
ORIGINATED BY: Tony Lindsey, Community Development Director – Building & Code Enforcement
REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Fuel Break Requirement Discussion

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Provide staff with direction on desired changes, if any, to the Paradise Municipal Code to present at a future Council meeting.

Background:

At the Town Council meeting in September 2024, Council Member Culleton initiated a discussion regarding the potential expansion of fuel break requirements. During the meeting, the staff and council members discussed the current standards and the rationale for enhancing defensible space fuel break regulations. An ad hoc committee, consisting of Council Members Crowder and Tryon, was established to explore this issue further. This committee was tasked with developing and presenting recommendations on this matter. Additionally, the staff was directed to prepare and submit suggestions or potential changes to the existing regulations for the Council's consideration, aiming to refine and possibly strengthen the community's approach to managing fire risks.

Analysis:

The current regulations in the Paradise Municipal Code stipulate that a parcel of less than 1 ½ acres must completely abate weeds across the entire property. In contrast, parcels larger than 1 ½ acres are only required to maintain a fuel break along the perimeter that is 30 feet wide. This differentiation in requirements is designed to manage fire risks effectively while considering larger property sizes and management feasibility.

The committee reviewed various fire mitigation strategies and ultimately reached a consensus on potential amendments to the code, as outlined below.

Proposed Requirements

1. Perimeter Fuel Break: To enhance fire safety and facilitate fire department access, the 30- foot requirement should be increased to a 50-foot-wide fuel break around the entire property perimeter for parcels greater than 1 ½ acre.

2. Division of Parcel, Interior Fuel Breaks:
a. Add a requirement for parcels greater than 1 ½ acres, up to 5 acres, to bisect the parcel, dividing it into two roughly equal sections with a fifty (50) foot fuel break. 188
b. Add a requirement for parcels greater than 5 acres to require additional fuel breaks. Each fifty (50) feet in width shall intersect at the center of the parcel, dividing it into four approximately equal sections. This design aims to segment the property into manageable "burn zones" for better fire suppression control.

3. Standardization of Requirements: The specifications for these interior fuel breaks will align with those established for an unimproved parcel of one and one-half (1½) acres or less. a. Weeds, dry grass, and brush must be mowed to a height of four (4) inches. b. Ladder fuels (vegetation, brush, and small trees under mature trees) shall be removed.
c. Trees shall be pruned up to six (6) feet from the ground. Pruning shall not exceed one-third (⅓) of the height for shorter-height trees. Tree placement shall be planned to ensure the mature canopy is no closer than ten (10) feet to the edge of any structure.

Justification for Increased Fuel Break Width
The California Building and Fire codes strongly support the recommendation to increase the fuel break width from 30 to 50 feet, primarily due to the concept of Fire Separation Distance in the building code, which acknowledges the benefits of maintaining up to thirty feet of open space to mitigate fire spread through radiant heat. Additionally, the fire code mandates a minimum access road width of 20 feet. Expanding the fuel break not only complies with this requirement but also provides extra space that significantly eases access for fire responders, which is particularly beneficial on larger, undeveloped lots. This structural and access planning enhancement is crucial for improving fire safety measures.

Safety Benefits to the Community
Extending the operational safety zone an additional 20 feet beyond the current 30-foot standard fuel break provides firefighters with a larger area to operate safely, especially critical near property boundaries where unpredictable changes in fire behavior can occur.

The regulations for fire prevention include rigorous weed abatement on smaller parcels and extensive fuel breaks on larger ones, effectively reducing the amount of combustible materials.

This significant decrease in available fuel minimizes the risk of fire ignition and its spread across properties, enhancing safety for the entire community.

Uniform vegetation management practices enforced by these regulations are vital in establishing barriers that slow down or prevent fires. This is crucial for safeguarding homes, businesses, and vital infrastructure. Additionally, the 50-foot fuel breaks around larger and within properties create the necessary space for emergency vehicles and personnel, improving access and reducing response times during emergencies. These measures also facilitate safer and more efficient evacuation paths, minimizing the danger to residents during wildfire incidents.

Considerations of Fire Behavior
Fuel breaks can effectively mitigate the effects of radiant heat, a significant factor in wildfire spread, by increasing the distance between combustible materials and structures or other areas, thus decreasing the risk of ignition. Strategically placed, these breaks also act as barriers interrupting the linear progression of wildfires, segmenting the land into smaller, manageable "burn zones." These zones significantly slow the fire’s movement, enhancing firefighters' ability to effectively manage and extinguish the blaze.

In areas like Paradise, where strong winds are prevalent, fuel breaks are crucial for preventing wind-driven embers from igniting adjacent vegetation. These embers, capable of traveling long 189
distances, pose a substantial risk of sparking isolated spot fires. Maintaining cleared zones helps mitigate this risk, a frequent issue in windy conditions.

As environmental conditions change, so does fire behavior, necessitating adaptive management strategies. Regulations that enforce rigorous fuel management are designed to respond to the increasing severity and frequency of wildfires, helping communities better prepare for and withstand these evolving challenges.

Strategic Benefits
Enhanced fire containment strategies like those used in lumber yards or mills involve segmented fuel breaks. These breaks serve as barriers that help prevent or slow the spread of fire across a property by reducing the contiguous fuel load. Additionally, they improve access for fire departments and enhance the effectiveness of their operational tactics.

This report outlines the strategic need and regulatory basis for proposed enhancements to fuel break requirements on large properties, focusing on fire safety and operational efficiency for fire response teams.

If the majority of the Town Council would like to consider formally adopting regulations governing the expanded fuel breaks, staff would bring back a draft ordinance for review based on feedback from the November Council meeting.

Financial Impact:

Discussion of municipal code ordinances will not financially impact the Town of Paradise. 190

Town of Paradise
Council Agenda Summary
Date: November 12, 2024
Agenda Item: 6(g)
ORIGINATED BY: Louis Johnson, Supervising Project Manager REVIEWED BY: Jim Goodwin, Town Manager
SUBJECT: Camp Fire Hydrant Repair Project – PSE Approval and Authorize Advertisement for Bids.

LONG TERM
RECOVERY PLAN:

No
COUNCIL ACTION REQUESTED:

1. Consider concurring with staff recommendation to file a CEQA Notice of Exemption for the Camp Fire Hydrant Repair Project; and,

2. Adopt Resolution No. 2024- , “A resolution of the Town Council of the Town of Paradise Approving the Plans, Specifications and Estimate for the Camp Fire Hydrant Repair Project and Authorizing Advertisement for Bids on the Project”. (ROLL CALL VOTE)
Background:

In 2004 the Town of Paradise entered an agreement with Paradise Irrigation District (PID) which describes ownership and maintenance responsibilities of both parties relating to fire hydrants and appurtenances. As stated in the agreement, “the Town accepts and acknowledges ownership of all fire hydrants and appurtenances.” The agreement also defines fire hydrants and appurtenances as “fire hydrants, mainline tees, gate valves, supply runs and bury-risers.” In 2018 the Town experienced the devastating Camp Fire during which unprecedented damage occurred to both public and private property, including Town fire hydrants. Shortly after the start of the Camp Fire the Federal Emergency Management Agency (FEMA) declared FEMA-4407- DR-CA on November 12, 2018.

In 2020, FEMA then went on to award Project Worksheet 359, Project #130763, to repair damage to fire hydrants townwide.

Since 2018 PID has made substantial progress on repairing hydrants damaged by the fire.

However, 24 hydrants remain inoperable and require repair to be fully functional.

Analysis:

Staff has prepared the plans, specifications, and cost estimate for the Camp Fire Hydrant Repair Project. The total project includes the repair of 24 fire hydrants. Fire hydrants were identified in cooperation with Paradise Irrigation District who operates and maintains the hydrants within the Town. A general map of the hydrant locations is included as an attachment. 191
With Council approval of the plans and specifications and authorization to advertise for bids, staff proposes the following schedule:

Advertise for bid: January 14 – February 04, 2025
Award Contract: March 11, 2025
Construction: Spring 2025
The plans and specifications for the project are included as an attachment.

Financial Impact:

In 2020, FEMA awarded Project Worksheet 359, Project #130763, related to FEMA-4407-DR-CA (Camp Fire), to repair damage to fire hydrants townwide. The award is for a federal share (75%) of $543,750 with a local match (25%) of $181,250 resulting in a total project budget of $725,000.

The local match portion of the project will be sourced from the Town’s Hydrant Fund collected by Paradise Irrigation District.

Environmental Review:

The CEQA process requires the lead agency to examine the project proposal and evaluate potential impacts. Staff has evaluated the subject project thoroughly and found that the project is exempt under State CEQA Guidelines [Section 15301(c) – Existing Facilities] which states:

Class 1 consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. The types of “existing facilities” itemized below are not intended to be all-inclusive of the types of projects which might fall within Class 1. The key consideration is whether the project involves negligible or no expansion of use.
(b) Existing facilities of both investor and publicly-owned utilities used to provide electric power, natural gas, sewerage, or other public utility services; Based on CEQA Section 15301(c), staff is requesting the Council to concur and approve for filing the Notice of Exemption with the Butte County Recorder’s Office.

Attachments:

A. Resolution
B. Camp Fire Hydrant Repair Project Vicinity Map
C. Camp Fire Hydrant Repair Project Bid Book
D. Camp Fire Hydrant Repair Project Plans
E. Camp Fire Hydrant Repair Project CEQA Notice of Exemption 192
1 TOWN OF PARADISE
RESOLUTION NO. 2024-___

A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF PARADISE

APPROVING THE PLANS, SPECIFICATIONS AND ESTIMATE FOR THE CAMP FIRE

HYDRANT REPAIR PROJECT AND AUTHORIZING ADVERTISEMENT FOR BIDS ON THE PROJECT.

WHEREAS, Fire hydrants sustained damage as a result of the Camp Fire; and, WHEREAS, the Town of Paradise has received a $543,750 allocation of FEMA funding; and,
WHEREAS, the purpose of the FEMA funding is to repair Fire Hydrants which have suffered serious damage as a result of the Camp Fire.

WHEREAS, eligible repairs may include, but are not limited to, replacing damage hydrants, required piping, valves, couplers, Tees, any other miscellaneous hardware and surface restorations.

WHEREAS, the Town of Paradise has received a $543,750 allocation of FEMA funds; and,
WHEREAS, the required 25% match funding for the FEMA funds will be sourced from the Town of Paradise Hydrant Fund collected by Paradise Irrigation District; and, WHEREAS, the purpose of the funding is to repair critical, damaged fire suppression infrastructure within the Town.

WHEREAS, the Camp Fire Hydrant Repair Project is consistent in scope with the approved FEMA funds: and,
NOW, THEREFORE, BE IT RESOLVED by the Town Council of the Town of Paradise as follows
Section 1. The design, plans, specifications and estimate for the Camp Fire Hydrant Repair Project described in the Town Council Agenda Summary for this Resolution are hereby approved.

Section 2. The Public Works Department is authorized to advertise the Camp Fire Hydrant Repair Project.
193

TOWN OF PARADISE
RESOLUTION NO. 2024- ___
2 PASSED AND ADOPTED by the Town Council of the Town of Paradise on this 12th day of November 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

By:

Ronald Lassonde, Mayor
ATTEST:

Melanie Elvis, Town Clerk
APPROVED AS TO FORM:

Scott E. Huber, Town Attorney
194
Project Location Map
580
749
407
502
690
739
507
627
799
573
89 803
12 600
646
471
619
561
118
294
543
517
606
81 California State Parks, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, USDA, USFWS, Esri, NASA, NGA, USGS, FEMA
Hydrant
´
195
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 1

TOWN OF PARADISE
Department of Public Works
5555 Skyway, Paradise, California 95969
Bid Book
Notice to Bidders, Special Provisions,
Bid Documents, Contract and Project Area Exhibits
Paradise, CA
Camp Fire Hydrant Repair Project
Federal Project No. 130763
Contract No. 8404 CON

FOR USE IN CONNECTION WITH
2018 Standard Specifications of the California Department of Transportation, 2018 Standard Plans, Revised Standard Plans and Revised Standard Specifications dated October 2021 are incorporated in part with these Special Provisions, General Prevailing Wage Rates and Labor Surcharge, and Equipment Rental Rates in effect on the date the project work is accomplished.

Bid Opening Date and Time: February 04, 2025 at 2:00 PM (PST) 196
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 2
Signature Page
Camp Fire Hydrant Repair Project
Federal Project No. 130763
Contract No. 8404 CON
The Special Provisions contained herein have been prepared by or under the direction of the following Registered Persons:
___________________________________________01/09/2025
Marc A. Mattox, Registered Engineer Date
RCE 79885, Exp. 09/30/2026
___________________________________________01/09/2025
Michael Randall, Registered Engineer Date
RCE 81192, Exp. 09/30/2025

197
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 3
Vicinity Map
198
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 4
Location Map
199
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 5
Table of Contents
Bid Book………………………………………………………………………………………………………………………………………………….1 Signature Page………………………………………………………………………………………………………………………….…..………..2 Vicinity Map…………………………………………………………………………………………………………………………………………….3 Location Map…………………………………………………………………………………………………………………………………………..4 Table of Contents..........................................................................................................................................5 Important Special Notice ............................................................................................................................12 Notice to Bidders ........................................................................................................................................13 Bid Item Section Reference.........................................................................................................................17 Standard Plans List......................................................................................................................................25 Special Provisions........................................................................................................................................28 Section 1 General............................................................................................................................28

1.A Project Specifications and Plans .................................................................................................28

1.B Abbreviations..............................................................................................................................28

1.C Definitions and Terms.................................................................................................................28 Section 2 Bidding ............................................................................................................................30

2.A General........................................................................................................................................30

2.B Bid Ineligibility.............................................................................................................................30

2.C Contractor Registration...............................................................................................................30

2.D Bid Documents............................................................................................................................30

2.E Job Site and Document Examination ..........................................................................................31

2.F Bid Item List.................................................................................................................................31

2.G Subcontractor List.......................................................................................................................31

2.H Bid Document Completion and Submittal ..................................................................................35

2.J Bid Withdrawal ...........................................................................................................................32

2.K Bid Opening.................................................................................................................................32

2.L Department’s Decision on Bid ....................................................................................................32

2.M Bid Relief .....................................................................................................................................32

2.N Submittal Failure History ............................................................................................................32

2.O Bid Rigging...................................................................................................................................32 200
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 6

2.P Addenda and Explanations to Bidders........................................................................................37 Section 3 Contract Award and Execution .......................................................................................38

3.A General........................................................................................................................................38

3.B Contract Award...........................................................................................................................38

3.C Contractor License ......................................................................................................................39

3.D Contract Bonds............................................................................................................................39

3.E Contract Execution............................................................................................................. .... 39

3.F Bidder’s Securities ......................................................................................................................39 Section 4 Scope of Work.................................................................................................................40

4.A General........................................................................................................................................40

4.B Location of Work.........................................................................................................................40

4.C Contract Documents Provided to Contractor.............................................................................40

4.D Change Orders – General............................................................................................................40

4.E Differing Site Conditions.............................................................................................................41 Section 5 Control of Work ..............................................................................................................42

5.A General........................................................................................................................................42

5.B Contract Components.................................................................................................................42

5.C Subcontracting ............................................................................................................................43

5.D Coordination with Other Entities................................................................................................43

5.E Construction Water.....................................................................................................................43

5.F Permits, Licenses, Agreements and Certifications – After Award ..............................................44

5.G Submittals ...................................................................................................................................44

5.H Construction Surveys ..................................................................................................................44

5.I Records........................................................................................................................................45

5.J Construction Limits.....................................................................................................................45

5.K Temporary Use Permit................................................................................................................45

5.L Vandalism....................................................................................................................................46

5.M Property and Facility Preservation..............................................................................................46

5.N Final Inspection and Contract Acceptance..................................................................................47 Section 6 Control of Materials........................................................................................................47

6.A General........................................................................................................................................47 201
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 7

6.B Procurement of Recovered Materials.........................................................................................47

6.C Authorized Materials List............................................................................................................47

6.D Buy America ................................................................................................................................48

6.E Buy Clean California Act..............................................................................................................49

6.F Quality Assurance .......................................................................................................................51 Section 7 Legal Relations and Responsibility to the Public.............................................................52

7.A General........................................................................................................................................52

7.B Prevailing Wage ..........................................................................................................................52

7.C Occupation Safety and Health Standards...................................................................................53

7.D Lead Compliance.........................................................................................................................53

7.E Public Convenience.....................................................................................................................53

7.F Public Safety................................................................................................................................54

7.G Indemnification – General ..........................................................................................................54

7.H Insurance.....................................................................................................................................55

7.I Federal Laws for Federal-Aid Contracts......................................................................................56 Section 8 Prosecution and Progress ...............................................................................................63

8.A General........................................................................................................................................63

8.B Schedule......................................................................................................................................63

8.C Pre-Construction Conference .....................................................................................................63

8.D Start of Job Site Activities............................................................................................................64

8.E Time ............................................................................................................................................65

8.F Delays..........................................................................................................................................65

8.G Liquidated Damages....................................................................................................................66 Section 9 Payment..........................................................................................................................66

9.A General........................................................................................................................................66

9.B Payment Scope............................................................................................................................66

9.C Force Account .............................................................................................................................67

9.D Payment Adjustments for Price Index Fluctuations....................................................................67

9.E Progress Payments......................................................................................................................67

9.F Prompt Payment of Funds Withheld to Subcontractors.............................................................68

9.G Prompt Progress Payment to Subcontractors ............................................................................69 202
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 8

9.H DBE Running Tally of Attainments..............................................................................................69

9.I Final Payment and Claims...........................................................................................................69

9.J Quantities of Aggregate and Other Roadway Materials.............................................................70

9.K Arbitration...................................................................................................................................70 Section 10 General............................................................................................................................70

10.A Order of Work .............................................................................................................................70

10.B Work Sequencing ........................................................................................................................71

10.C Advanced Notification.................................................................................................................71

10.D Develop Water Supply ................................................................................................................72 Section 11 Welding ...........................................................................................................................73 Section 12 Temporary Traffic Control...............................................................................................73

12.A General........................................................................................................................................73

12.B Traffic Control System.................................................................................................................73

12.C Flagging Costs..............................................................................................................................74

12.D Portable Changeable Message Signs ..........................................................................................74

12.E Barricades....................................................................................................................................74

12.F Construction Area Signs..............................................................................................................74

12.G Pedestrian Facilities ....................................................................................................................74

12.H Temporary Pavement Delineation..............................................................................................74 Section 13 Water Pollution Control..................................................................................................75

13.A Definitions and Abbreviations.....................................................................................................75

13.B Prepare Stormwater Pollution Prevention Plan..........................................................................76

13.C Temporary Soil Stabilization .......................................................................................................76

13.D Temporary Sediment Control .....................................................................................................76

13.E Temporary Tracking Control .......................................................................................................77

13.F Temporary Concrete Washouts..................................................................................................77

13.G Temporary Linear Sediment Barriers..........................................................................................77

13.H Rain Event Action Plan ................................................................................................................77

13.I Stormwater Sampling, Analysis and Reports..............................................................................77

13.J Stormwater Annual Report.........................................................................................................78

13.K Job Site Management .................................................................................................................78 203
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 9

13.L Street Sweeping ..........................................................................................................................78 Section 14 Environmental Stewardship............................................................................................78

14.A Cultural Resources......................................................................................................................78

14.B Noise Control ..............................................................................................................................78

14.C Dust Control ................................................................................................................................78

14.D Species Protection.......................................................................................................................79 Section 15 Existing Facilities.............................................................................................................79

15.A Remove Concrete........................................................................................................................79

15.B Salvaging Facilities.......................................................................................................................79

15.C Adjust Existing Water Valve, Water Meter, Manhole Cover, Fire Hydrant, Utility Box to Grade 79 15.D Pothole Underground Utilities……………….……………………………………………………………………………..82

15.E Handling and Removal of Existing Pipe………..………………………..…………………………………………………82 Section 17 Clearing and Grubbing ....................................................................................................80 Section 19 Earthwork........................................................................................................................80

19.A Roadway Excavation ...................................................................................................................80

19.B Compaction.................................................................................................................................80

19.C Shoulder Backing.........................................................................................................................80

19.D Embankment...............................................................................................................................81 Section 26 Aggregate Bases..............................................................................................................81

26.A Class 2 Aggregate Base................................................................................................................81 Section 36 Surfacing and Pavements................................................................................................81 Section 39 Asphalt Concrete.............................................................................................................81

39.A Hot Mix Asphalt (Type A) ............................................................................................................81

39.B Pavement Edge Treatments........................................................................................................81

39.C Place Hot Mix Asphalt Dike (Type A) and Miscellaneous Areas..................................................81

39.D Minor Hot Mix Asphalt................................................................................................................82

39.E Remove Asphalt Concrete Dike...................................................................................................82

39.F Remove Base and Surfacing........................................................................................................82 Section 40 Concrete Pavement.........................................................................................................82

40.A Continuously Reinforced Concrete Pavement............................................................................82 204
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 10
Section 51 Concrete Structures........................................................................................................82

51.A Structural Concrete, Drainage Inlet ............................................................................................82

51.B Minor Concrete...........................................................................................................................83

51.C Minor Concrete (Minor Structure)..............................................................................................83 Section 64 Plastic Pipe ......................................................................................................................83

64.A Plastic Pipe ..................................................................................................................................83

64.B Trench Backfill.............................................................................................................................83

64.C Payment......................................................................................................................................83 Section 73 Concrete Curbs and Sidewalks........................................................................................83

73.A Minor Concrete (Curb & Gutter), Minor Concrete (Sidewalk), Minor Concrete (Curb Ramp), (Miscellaneous Construction) .................................................................................................................83

73.B 84Remove
Concrete…………………………………………………………………………………………………………………..84 Section 78 Incidental Construction.................................................................................................110

78.A Adjust Monument Cover to Grade and Remove and Replace Monument...............................110

78.B Adjust Access Box Frame and Cover (Utility), Adjust Manhole Frame and Cover (Utility), Lower and Raise Frame and Cover (Utility) .....................................................................................................111 Section 81 Miscellaneous Traffic Control Devices..........................................................................111

81.A Delineator (Class 1)...................................................................................................................111

81.B 81.B Retroreflective Pavement Markers (Recessed) ................................................................111 Section 84 Markings........................................................................................................................111

84.A Thermoplastic Stripes and Pavement Marking.........................................................................111

84.B Paint Traffic Stripe (2-Coat).......................................................................................................112 APPENDIX 113
Bid to the Town of Paradise..........................................................................................................................1 List of Subcontractors...................................................................................................................................4 Exhibit 12-B Bidder’s List of Subcontractors (DBE & Non-DBE) – Part 1.......................................................4 Exhibit 12-B Bidder’s List of Subcontractors (DBE & Non-DBE) – Part 2.......................................................5 Equal Employment Opportunity Certification ..............................................................................................6 Federal Minimum Wage Rates......................................................................................................................7 Non-Lobbying Certification for Federal-Aid Contracts .................................................................................8 DISCLOSURE OF LOBBYING ACTIVITIES.........................................................................................................9 205
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 11
Public Contract Code...................................................................................................................................11 Non-Collusion Affidavit...............................................................................................................................12 Debarment and Suspension Certification...................................................................................................13 Opt-Out Form…………...................................................................................................................................14 Bid Signature Page ......................................................................................................................................15 Bidder’s Bond……………………........................................................................................................................16 Certificate of Acknowledgement................................................................................................................17 Owner-Contractor Agreement......................................................................................................................1 Title VI Assurance (US DOT Order 1050.2A) .................................................................................................8 Bond of Faithful Performance.......................................................................................................................9 Certificate of Acknowledgement................................................................................................................10 Payment Bond……………...............................................................................................................................11 FHWA Form 1273, Federal Aid Contract Provisions ...................................................................................12 206
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 12
Important Special Notice
The Bid Documents are bound in a book together with the Notice to Bidders, Special Provisions, and Contract. The entire Bid Book does not need to be submitted with the Bid. It is the Bidder's responsibility to confirm the Bid includes all applicable forms, bonds and other attachments to remain a responsive bidder.

Submittal of a complete Subcontractors List must be submitted at bid opening. Refer to Section 2.G of these Special Provisions for more information.

Attention is directed that Section 12-1.03 “Flagging Costs” of the Standard Specifications is hereby deleted. All flagging costs will be borne by the contractor (100%) and no division of costs will be made therefor.

In accordance with FHWA requirements for federal-aid transportation projects, at least 30% of the total contract work is to be performed by the prime contractor.
207
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 13
Notice to Bidders
Town of Paradise
Department of Public Works
Sealed bids for the work shown in the plans and specifications entitled:

Camp Fire Hydrant Repair Project
Federal Project No. 130763
Contract No. 8404 CON
will be received at the Office of the Town of Paradise Town Clerk at 5555 Skyway, Paradise, California 95969 until February 04, 2025 at 2:00 PM at which time they will be publicly opened and read aloud in the conference room at the aforementioned address. The envelope enclosing the bid submittal shall be clearly marked “Bid for Contract No. 8404 CON, Camp Fire Hydrant Repair Project” and the date and hour for opening of bids. Bid forms for the project work are included herein.

Each bid must be accompanied by cash, cashier’s check, certified check, or a bidder’s bond executed by an admitted surety insurer made payable to the Town of Paradise for an amount equal to at least ten percent (10%) of the total bid amount, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract.

DESCRIPTION OF WORK
The work in general consists of fire hydrant replacement. The work will include removal of existing Warf hydrants, piping and valves and installation of new pipe, valves and Clow 850 fire hydrants, surface restoration and other items of work as indicated on the project bid book and plans.

ENGINEER’S ESTIMATE
The Engineer’s Estimate for this contract is $725,000.

TRAINEES OR APPRENTICES
The number of trainees or apprentices for this contract is 0.

WORKING DAYS
The project has 50 Working Days.

PRE-BID MEETING
No pre-bid meeting is scheduled for this project.

FUNDING
The work to be performed under this Contract will be funded by the Federal Emergency Management Agency (FEMA) funds. Contractor will be required to comply with all Federal Requirements set forth in the Special Provisions. In the event of a conflict between any Federal Requirement and any other provision in the Contract Documents, the more stringent provision shall control and prevail.
208
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 14

BUY AMERICA PROVISIONS
This project is subject to the "Buy America" provisions of the Surface Transportation Assistance Act of 1982 as amended by the Intermodal Surface Transportation Efficiency Act of 1991.

LIQUIDATED DAMAGES
Liquidated damages for all work are as shown in the following table:

Liquidated Damages
Total bid Liquidated damages per
From over To day
$0 $60,000 $1,400
$60,000 $200,000 $2,900
$200,000 $500,000 $3,200
$500,000 $1,000,000 $3,500
$1,000,000 $2,000,000 $4,000
$2,000,000 $5,000,000 $4,800
$5,000,000 $10,000,000 $6,800
$10,000,000 $20,000,000 $10,000
$20,000,000 $50,000,000 $13,500
$50,000,000 $100,000,000 $19,200
$100,000,000 $250,000,000 $25,300
CONTRACTOR’S LICENSE CLASSIFICATION
The contractor shall possess a California Class A license or a combination of classes required by the categories and types of project work included in this contract at the time this contract is awarded. This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990.

OBTAINING OR INSPECTING CONTRACT DOCUMENTS
The Project Bid Book and Construction Plans may be inspected at no cost at the Department’s offices, or copies of these documents may be obtained electronically only from the Town’s website at https://www.townofparadise.com/pwe/page/current-bid-notices-contractorsconsultants via Public Purchase.

Copies of the referenced Standard Specifications issued by the State of California, Department of Transportation, may be obtained from the State of California, Department of Transportation, Publications Distribution Unit, 1900 Royal Oaks Drive, Sacramento, CA 95819.

Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Any such inquiries or questions, submitted after bid opening, will not be treated as a bid protest.

Technical questions requests for information regarding the project must be submitted through Public Purchase on the project link. All inquiries shall be submitted prior to 5 calendar days of the bid opening date.

BIDDERS BOND
The successful bidder, at bidder’s own expense, shall furnish a faithful performance bond and a payment bond each in an amount of one hundred percent (100%) of the total bid, respectively, and in the form prescribed for use by the Town of Paradise. The bonds shall be provided to the Town at the time of contract execution. The Town of Paradise affirms that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. 209
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 15

FEDERAL AND CALIFORNIA PREVAILING WAGE REQUIREMENTS
The Project requires the payment of prevailing wage rates. Pursuant to California Labor Code Section 1770 et seq, the general prevailing wage rates in the county in which the project work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at Town of Paradise and available from the California Department of Industrial Relations’ Internet web site at http://www.dir.ca.gov/DLSR/PWD. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates.

Attention is directed to the Federal minimum wage rate requirements in the Special Provisions. The Federal minimum wage rates set forth in this project as predetermined by the United States Secretary of Labor are set forth in the books entitled “Notice to Contractors, Special Provisions, and Contract Documents”. The Federal minimum wage rates for this project may be obtained directly from the Department of Labor home page at www.gpo.gov/davisbacon. Click on “Browse All Determinations By State”, then click on “California”, and then click on the “Highway” determination for Butte County. Addenda to modify the Federal minimum wage rates, if necessary, will be issued to holders of the plans and specifications.

If there is a difference between the minimum wage rates predetermined by the United States Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate.

The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question.

The U.S. Department of Transportation (DOT) provides a toll-free “hotline” service to report bid rigging activities.

Bid rigging activities can be reported Mondays through Fridays, between 8:00 a.m. and 5:00 p.m., Eastern Time, Telephone No. 1-800-424-9071. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report these activities. The “hotline” is part of the DOT’s continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially, and caller anonymity will be respected.

TOWN’S DECISION ON BID
In its sole discretion, the Town of Paradise or its designee may reject any and all bids presented, may accept an item or group of items of any bid, may modify or cancel in whole or in part the notice inviting bids, and may determine to re-advertise for bids. Similarly, the Town Council or its designee reserves the right to waive non-material informalities and non-material irregularities in any bids received.

If two or more bids received are for the same total amount or unit price, quality and service being equal, the Town Council or its designee may accept the one it chooses or accept the lowest bid made after negotiation with tie bidders pursuant to Public Contract Code 20166.

The Town officer or employee conducting the bidding procedure shall present the bid tabulation to the Town Council or its designee for consideration and award if deemed appropriate. 210
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 16
Bids will be required to set forth the price of the items bid upon, the total sales and use taxes that will be due on the purchase or use of the items bid upon, and a total figure for the price plus tax. Any difference between the taxes shown on the bid as the total figure and that actually due shall be the responsibility of the bidder.

No charge for delivery, shipping, parcel post, packing, insurance, license fees, permits, or for any other purpose will be paid by the Town of Paradise unless expressly included and itemized in the bid.

PUBLIC CONTRACT CODE SECTION 7201
Pursuant to Public Contract Code Section 7201, Town will withhold five percent (5%) from each payment to contractor until completion of the project. Town will release such retention amount to the contractor 30 days after the recordation of the Notice of Completion for the Project, provided there are no pending stop notices.

PUBLIC CONTRACT CODE SECTION 22300
Pursuant to Public Contract Code Section 22300, for monies earned by the Contractor and withheld by the Town to ensure the performance of the Contract, the Contractor, may, at its option, choose to substitute securities meeting the requirements of said Public Contract Code Section 22300. Such securities shall be valued by the Town Treasurer, whose decision shall be final. Securities not listed under Public Contract Code Section 22300 or Government Code Section 16430 must be pre-qualified by the Town Treasurer before bid opening in order to be accepted by the Town as security.

TOWN OF PARADISE
01/09/2025
______________________________________________________
By: Town Manager Date
Advertisement Date: January 14, 2025
Advertisement Date: January 21, 2025
211
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 17
Schedule
Hydrant ID Description Estimated
Quantity
Unit of
Measure
12 REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" PIPE 3 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
4"x6" REDUCER 1 EA
6" PIPE 3 LF
SURFACE RESTORATION 3 LF
81 REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 10 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 10 LF
SURFACE RESTORATION 10 LF
89 REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 20 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 20 LF
SURFACE RESTORATION 20 LF
118 REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
212
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 18
Hydrant ID Description Estimated
Quantity
Unit of
Measure
REMOVE/DEMO 4" PIPE 6 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
4"x6" REDUCER 1 EA
6" PIPE 6 LF
SURFACE RESTORATION 6 LF
294
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 30 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 30 LF
SURFACE RESTORATION 30 LF
407
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 10 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
12"x12"x6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 10 LF
SURFACE RESTORATION 10 LF
471
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 20 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" 90-DEGREE ELBOW 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 20 LF
SURFACE RESTORATION 20 LF
213
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 19
Hydrant ID Description Estimated
Quantity
Unit of
Measure
502
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" PIPE 15 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
4"x6" REDUCER 1 EA
6" PIPE 15 LF
SURFACE RESTORATION 15 LF
507
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 7 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 7 LF
SURFACE RESTORATION 7 LF
517
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 30 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 30 LF
SURFACE RESTORATION 30 LF
543
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 10 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" 90-DEGREE ELBOW 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
214
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 20
Hydrant ID Description Estimated
Quantity
Unit of
Measure
6" PIPE 10 LF
SURFACE RESTORATION 10 LF
561
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 30 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 30 LF
SURFACE RESTORATION 30 LF
573
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" PIPE 6 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
4"x6" REDUCER 1 EA
6" PIPE 6 LF
SURFACE RESTORATION 6 LF
580
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 40 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 40 LF
SURFACE RESTORATION 40 LF
600
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 10 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
215
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 21
Hydrant ID Description Estimated
Quantity
Unit of
Measure
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 10 LF
SURFACE RESTORATION 10 LF
606
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" PIPE 50 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
4"x6" REDUCER 1 EA
6" PIPE 50 LF
SURFACE RESTORATION 50 LF
619
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 30 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 30 LF
SURFACE RESTORATION 30 LF
627
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 10 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 10 LF
SURFACE RESTORATION 10 LF
646
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
216
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 22
Hydrant ID Description Estimated
Quantity
Unit of
Measure
REMOVE/DEMO 4" PIPE 40 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 40 LF
SURFACE RESTORATION 40 LF
690
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 14 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 14 LF
SURFACE RESTORATION 14 LF
739
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 10 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 10 LF
SURFACE RESTORATION 10 LF
749
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 10 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
217
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 23
Hydrant ID Description Estimated
Quantity
Unit of
Measure
6" PIPE 10 LF
SURFACE RESTORATION 10 LF
799
REMOVE/DEMO 6" HYDRANT ASSEMBLY 1 EA
CLOW 850 HYDRANT ASSEMBLY 1 EA
SURFACE RESTORATION 3 LF
803
REMOVE/DEMO 4" WHARF HYDRANT ASSEMBLY 1 EA
REMOVE/DEMO 4" ISOLATION VALVE/VALVE BOX 1 EA
REMOVE/DEMO 4" PIPE 30 LF
CLOW 850 HYDRANT ASSEMBLY 1 EA
6" TEE AT MAIN 1 EA
6" ISOLATION VALVE/VALVE BOX 1 EA
6" PIPE 30 LF
SURFACE RESTORATION 30 LF
- TRAFFIC CONTOL 1 LS
- TRENCH SAFETY 1 LS
- DISINFECT/FLUSH 1 LS
- WATER POLLUTION CONTROL 1 LS
- PORTABLE CHANGEABLE MESSAGE SIGNS (MIN OF TWO) 1 LS
- MOBILIZATION/DEMOBILIZATION 1 LS
218
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 24
Bid Item Section Reference
Bid
Item Description Estimated Quantity
Unit of
Measure Unit Price Total Price
1 REMOVE/DEMO 6" WHARF HYDRANT
ASSEMBLY 1 EA
2 REMOVE/DEMO 4" WHARF HYDRANT
ASSEMBLY 23 EA
3 REMOVE/DEMO 4" PIPE 441 LF
4 CLOW 850 HYDRANT ASSEMBLY 24 EA
5 4"x6" REDUCER 5 EA
6 6” PIPE 441 LF
7 SURFACE RESTORATION 444 LF
8 REMOVE/DEMO 4" ISOLATION
VALVE/VALVE BOX 18 EA
9 6" TEE AT MAIN 15 EA
10 6" ISOLATION VALVE/VALVE BOX 18 EA
11 TRAFFIC CONTOL 1 LS
12 TRENCH SAFETY 1 LS
13 DISINFECT/FLUSH 1 LS
14 WATER POLLUTION CONTROL 1 LS
15 PORTABLE CHANGEABLE MESSAGE SIGNS
(MIN OF TWO) 1 LS
16 MOBILIZATION/DEMOBILIZATION 1 LS
219
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 25
Standard Plans List
The Standard Plan sheets and Town of Paradise Standard Details applicable to this contract include, but are not limited to those indicated below and are provided in the Appendix to the Special Provisions. Applicable Revised Standard Plans (RSP) and New Standard Plans (NSP) indicated below are also included in the Appendix to the Special Provisions.

PLAN NO.

ABBREVIATIONS, LINES, SYMBOLS AND LEGEND
A3A Abbreviations (Sheet 1 of 3)
A3B Abbreviations (Sheet 2 of 3)
A3C Abbreviations (Sheet 3 of 3)
A10A Legend- Lines and Symbols (Sheet 1 of 5)
A10B Legend- Lines and Symbols (Sheet 2 of 5)
A10C Legend- Lines and Symbols (Sheet 3 of 5)
A10D Legend- Lines and Symbols (Sheet 4 of 5)
A10E Legend- Lines and Symbols (Sheet 5 of 5)

PAVEMENT MARKERS, TRAFFIC LINES, AND PAVEMENT MARKINGS
A20A Pavement Markers and Traffic Lines – Typical Details RSP A20B Pavement Markers and Traffic Lines – Typical Details RSP A20D Pavement Markers and Traffic Lines – Typical Details A24A Pavement Marking – Arrows
A24B Pavement Marking – Arrows and Symbols
A24C Pavement Marking – Symbols and Numerals
A24D Pavement Marking – Words
RSP A24E Pavement Marking – Words, Limit and Yield Lines A24F Pavement Marking - Crosswalks

EXCAVATION AND BACKFILL
A62A Excavation and Backfill - Miscellaneous Details
A26D Excavation and Backfill – Concrete Pipe Culverts
A26DA Excavation and Backfill – Concrete Pipe Culverts – Indirect Design Method A62F Excavation and Backfill – Metal and Plastic Culverts

OBJECT MARKERS, DELINEATORS, CHANNELIZERS AND BARRICADES A73C Delineators, Channelizers and Barricades

CURBS, DRIVEWAYS, DIKES, CURB RAMPS AND ACCESSIBLE PARKING A87A Curbs and Driveways
A87B Hot Mix Asphalt Dikes
A88B Curb Ramp and Island Passageway Details
A88A Curb Ramp Details

DRAINAGE INLETS, PIPE INLETS AND GRATES
D72E CIP Drainage Inlets – Types GO and GDO
D72F CIP Drainage Inlets Notes
220
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 26
D72G CIP Drainage Inlets Tables
D74 Drainage Inlet Details
D77A Grate Details No. 1
D77B Grate Details No. 2

GUTTER AND INLET DEPRESSIONS
D78A Gutter Depressions

FLARED END SECTIONS
D94A Metal and Plastic Flared End Sections

PIPE COUPLING AND JOINT DETAILS
D97H Reinforced Concrete Pipe or non-Reinforced Concrete Pipe – Standard and Positive joints
D97I Corrugated Polyvinyl Chloride pipe with Smooth Interior Standard and Positive Joints

TEMPORARY PEDESTRIAN ACCESS ROUTE
T30 Temporary Pedestrian Access Routes - Typical Sidewalk Closure and Pedestrian Detour T32 Temporary Pedestrian Access Routes - Typical Sidewalk/Crosswalk Closure and Pedestrian Detour
T33 Temporary Pedestrian Access Routes – Ramos
T34 Temporary Pedestrian Access Routes – Curb Ramp Options

TEMPORARY WATER POLLUTION CONTROL
T56 Temporary Water Pollution Control Details – (Temporary Fiber Rolls) T58 Temporary Water Pollution Control Details – (Temporary Construction Entrance) T59 Temporary Water Pollution Control Details – (Temporary Concrete Washout Facility) T61 Temporary Water Pollution Control Details – (Temporary Drainage Inlet Protection) T62 Temporary Water Pollution Control Details – (Temporary Drainage Inlet Protection) T63 Temporary Water Pollution Control Details – (Temporary Drainage Inlet Protection)

TEMPORARY CRASH CUSHIONS, RAILING AND TRAFFIC SCREEN
T1A Temporary Crash Cushion, Sand Filled (Unidirectional) T1B Temporary Crash Cushion, Sand Filled (Bidirectional) T2 Temporary Crash Cushion, Sand Filled (Shoulder Installations) T3A Temporary Railing (Type K)
T3B Temporary Railing (Type K)

ROADSIDE SIGNS
RS1 Roadside Signs, Typical Installation Details No. 1
RS2 Roadside Signs - Wood Post, Typical Installation Details No. 2 RS4 Roadside Signs, Typical Installation Details No. 4
ELECTRICAL SYSTEMS – LEGEND
RSP ES-1A Electrical Systems (Legend)
RSP ES-1B Electrical Systems (Legend)
RSP ES-1C Electrical Systems (Legend)

ELECTRICAL SYSTEMS - SIGNAL HEADS, SIGNAL FACES AND MOUNTINGS RSP ES-4A Electrical Systems (Signal Head Mounting)
221
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 27
RSP ES-4B Electrical Systems (Pedestrian Signal Heads)
RSP ES-4C Electrical Systems (Signal Heads and Mountings) RSP ES-4D Electrical Systems (Signal Head Mounting)
ELECTRICAL SYSTEMS – DETECTORS
ES-5A Electrical Systems (Loop Detectors)
RSP ES-5B Electrical Systems (Detectors)
RSP ES-5C Electrical Systems (Accessible Pedestrian Signal and Push Button Assemblies) RSP ES-5D Electrical Systems (Curb and Shoulder Termination, Trench, and Handhole Details) ELECTRICAL SYSTEMS – SIGNAL AND LIGHTING STANDARD
RSP ES-7B Electrical Systems (Signal and Lighting Standard, Type 1 and Equipment Identification Characters)
ELECTRICAL SYSTEMS – SIGNAL AND LIGHTING STANDARD DETAILS RSP ES-7M Electrical Systems (Signal and Lighting Standard - Detail No. 1) RSP ES-7N Electrical Systems (Signal and Lighting Standard - Detail No. 2) ELECTRICAL SYSTEMS – PULL BOX
RSP ES-8A Electrical Systems (Non-Traffic Pull Box)

ELECTRICAL SYSTEMS - ISOFOOTCANDLE CURVES AND FOUNDATION DETAILS ES-11 Electrical Systems (Foundation Installations)
ELECTRICAL SYSTEMS – SPLICE INSULATION METHODS, FUSE RATING, KINKING AND BANDING

DETAILS
ES-13A Electrical Systems (Splice Insulation Methods Details) 222
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 28
Special Provisions
Section 1 General

1.A Project Specifications and Plans
The work embraced herein shall conform to the provisions in the Standard Specifications dated 2018, Revised Standard Specifications dated April 15, 2022, the Standard Plans dated 2018, Revised Standard, the Butte County Standard Details, and these Special Provisions.

In case of conflict between the Standard Specifications and these Special Provisions, these Special Provisions shall take precedence over and shall be used in lieu of the conflicting portions.

Amendments to the Standard Specifications set forth in these Special Provisions shall be considered as part of the Standard Specifications for the purposes set forth in Section 1, "General," of the Standard Specifications.

Whenever either the term "Standard Specifications is amended" or the term "Standard Specifications are amended" is used in the special provisions, the text or table following the term shall be considered an amendment to the Standard Specifications. In case of conflict between such amendments and the Standard Specifications, the amendments shall take precedence over and be used in lieu of the conflicting portions.

1.B Abbreviations
Refer to Section 1-1.06, “Abbreviations” of the Standard Specifications.

1.C Definitions and Terms
Wherever in the Standard Specifications, Special Provisions, Notice to Bidders, Bid, Contract, or other contract documents the following terms are used; the intent and meaning shall be interpreted as follows:

Town - Town of Paradise, California, a legal entity organized and existing in the State of California, where reference is made to the agency administering the Contract.

Bid Package – Bid Book including Notice to Bidders, Bid Documents, Contract, Special Provisions and Project Plans.

Contract Documents – Refers collectively to the Contract, Special Provisions, Project Plans, Notice to Bidders, Bid Documents, and Standard Specifications.

Contract Time – Number of original working days as adjusted by any time adjustment.

Day – 24 consecutive hours running from midnight to midnight; calendar day. 1) business day: Day on the calendar except Saturday, Sunday or holiday. 2) working day: Time measure unit for work progress. A working day is any day except:
a. Saturday, Sunday and holiday.
b. Day when you cannot perform work on the controlling activity for at least 50 percent of the day with at least 50 percent of the normal labor and equipment due to any of the following:
i. Adverse weather-related conditions that cause the Contractor to dismiss the crew. ii. Any period of time declared by the National Weather Service as a Red Flag Warning encompassing the project area.
iii. Maintaining traffic under the Contract.
iv. Engineer's direction to suspend the controlling activities for reasons unrelated to the Contractor's performance.
v. Unanticipated event not caused by either party such as:
223
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 29

1. Act of God

2. Act of a public enemy.

3. Epidemic.

4. Fire.

5. Flood.

6. Governor-declared state of emergency.

7. Landslide.

8. Quarantine restriction.
vi. Issue involving a third party, including:

1. Industry or area-wide labor strike.

2. Material shortage.

3. Freight embargo.

4. Jurisdictional requirement of a law enforcement agency.

5. Workforce labor dispute of a utility or nonhighway facility owner resulting in a nonhighway facility rearrangement not described and not solely for the Contractor's convenience. Rearrangement of a nonhighway facility includes installation, relocation, alteration, or removal of the facility.

Department or Department of Transportation – Department of Public Works of the Town of Paradise, California.

Director or Director of Transportation – The Town Council of the Town of Paradise, California.

Disadvantaged Business Enterprise – Disadvantaged Business Enterprise as defined in 49 CFR 26.5.

Engineer – The Director of Public Works of the Town of Paradise, California, acting either directly or through duly authorized agents or consultants.

Early Completion Time – Difference in time between an early scheduled completion date and the Contract completion date.

Highway – Highway, roadway, street, avenue, lane, boulevard, or other public thoroughfare for vehicular traffic.

Job Site Activities – Work done within the physical limits of the Contract.

Laboratory or Transportation Laboratory – The established laboratory of the Town of Paradise Department of Public Works or laboratories authorized by the Town to test materials and work involved in the contract.

Liquidated Damages – The amount prescribed in the Special Provisions, pursuant to the authority of Government Code Section 53069.85 to be paid to the Town of Paradise or to be deducted from any payments due or to become due the Contractor for each day of delay in completing the whole or any specified portion of the work beyond the time allowed in the Special Provisions.

Mobilization – Preparatory work that must be performed or costs incurred before starting work on the various items on the job site (Pub Cont Code § 10104).

Scheduled Completion Date – Planned work completion date shown on the current schedule.

Standard Specifications – The 2018 edition of the Standard Specifications of the State of California, Department of Transportation. Any reference therein to the State of California or a State agency, office or officer shall be interpreted to refer to the Town of Paradise or its corresponding agency, office, or officer acting under this contract.

State – Town of Paradise, California, a legal entity organized and existing in the State of California, where reference is made to the agency administering the Contract. 224
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 30
State Contract Act – All applicable provisions of the Public Contract Code (excluding Chapter 1, Division 2, Part 2, therein), Government Code, Labor Code, Civil Code, Business & Professions Code, as they apply to contracts with local public agencies, as defined in said codes. No provision of the Standard Specifications or these special provisions shall be construed as an election under Public Contract Code section 20396 to have this project performed under the provisions of the State Contract Act. Individual provisions of the State Contract Act shall apply only as specifically referenced in these specifications or special provisions.

State Highway Engineer – The Town Engineer of the Town of Paradise, State of California Transportation Building, Sacramento – Department of Public Works, Town of Paradise State of California.

Section 2 Bidding
Refer to Section 2, "Bidding" of the Standard Specifications.

Section 2 is amended as deleted and replaced with the following provisions:

2.A General
Section 2 includes specifications related to bid eligibility and the bidding process.

The electronic bid specifications in Section 2 apply if Electronic Bidding Contract is shown on the cover of the Notice to Bidders and Special Provisions.

2.B Bid Ineligibility
A firm that has provided architectural or engineering services to the Department for this contract before bid submittal for this contract is prohibited from any of the following:

1. Submitting a bid

2. Subcontracting for a part of the work

3. Supplying materials

2.C Contractor Registration
No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

2.D Bid Documents

12.D General
The Bid book includes bid forms and certifications.

The Notice to Bidders and Special Provisions includes the Notice to Bidders, revised standard specifications, and special provisions.

The Project Bid Book and Construction Plans may be inspected at no cost at the Department’s offices, 5555 Skyway, Paradise, California 95969, or copies of these documents may be obtained electronically only from the Town’s website at https://www.townofparadise.com/pwe/page/current-bid-noticescontractorsconsultants via Public Purchase.

The Bid Documents are bound in a book together with the Notice to Bidders, special provisions, and contract. The project plans are a separate attachment. The entire Bid Book does not need to be submitted with the Bid. It is the Bidder's responsibility to confirm the Bid includes all applicable forms, bonds and other attachments to remain a responsive bidder. This includes all DBE related bid forms. 225
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 31

22.D Supplemental Project Information
The Department makes supplemental information available as specified in the special provisions.

The Department makes the following supplemental project information available:

Supplemental Project Information
Means Description
Included in the Appendix CEQA CE
If other supplemental project information is available for inspection, you may view it by phoning in a request.

Make your request at least 7 days before viewing. Include in your request:

1. Project Title

2. Contract number

3. Viewing date

4. Contact information, including telephone number

2.E Job Site and Document Examination
Examine the job site and bid documents. Notify the Department of apparent errors and patent ambiguities in the plans, specifications, and Bid Item List. Failure to do so may result in rejection of a bid or rescission of an award.

Bid submission is your acknowledgment that you have examined the job site and bid documents and are satisfied with:

1. General and local conditions to be encountered

2. Character, quality, and scope of work to be performed

3. Quantities of materials to be furnished

4. Character, quality, and quantity of surface and subsurface materials or obstacles

5. Requirements of the contract

2.F Bid Item List
Submit a bid based on the bid item quantities the Department shows on the Bid Item List.

2.G Subcontractor List
On the Bidders List of Subcontractor form, list each subcontractor to perform work in an amount in excess of 1/2 of 1 percent of the total bid or $10,000, whichever is greater (Pub Cont Code § 4100 et seq.).

For each subcontractor listed, the Subcontractor List form must show:

1. Business name and the location of its place of business

2. California contractor license number

3. Public works contractor registration number

4. Portion of work subcontractor will perform. Show the portion of the work by:
a. Bid item numbers for the subcontracted work
b. Dollar amount associated with the subcontracted work for each bid item listed c. Description of the subcontracted work if the percentage of the bid item listed is less than 100 percent

5. DBE status, DBE Certification Number and annual gross receipts 226
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 32
In accordance with Public Contract Code § 4104 (a)(2)(B), the Town requires a completed subcontractor list at the bid opening. An incomplete subcontractors list results in a non-responsive bid. Submittals after the bid opening will not be accepted.

2.H Equal Employment Opportunity
The regulation at 41 C.F.R. Part 60-1.4(b) requires the insertion of the following contract clause.

1. The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following:

Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

2. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.

3. The contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the contractor's legal duty to furnish information.

4. The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

5. The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

6. The contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.
227
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 33

7. In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.

8. The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance:

Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the contractor may request the United States to enter into such litigation to protect the interests of the United States. The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, That if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the contract.

The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance.

The applicant further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, Government contracts and federally assisted construction contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the
applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings

2.H.1 Contract Assurance
Under 49 CFR 26.13(b):
228
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 34
The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR 26 in the award and administration of federal-aid contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the contractor from future bidding as non-responsible.

2.H.2 Prompt Progress Payment
The prime contractor or subcontractor shall pay to any subcontractor, not later than seven days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the contractor on account of the work performed by the subcontractors, to the extent of each subcontractor’s interest therein. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the prime contractor or subcontractor to a subcontractor, the prime contractor or subcontractor may withhold no more than 150 percent of the disputed amount. Any violation of this requirement shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subcontractor, of 2 percent of the amount due per month for every month that payment is not made.

In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorney’s fees and costs. The sanctions authorized under this requirement shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal. This clause applies to both DBE and non-DBE subcontractors.

2.H.3 Prompt Payment of Withheld Funds to Subcontractors The Agency may hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency, of the contract work, and pay retainage to the prime contractor based on these acceptances. The Agency shall designate one of the methods below in the contract to ensure prompt and full payment of any retainage kept by the prime contractor or subcontractor to a subcontractor. The Agency shall include either Method 1, Method 2, or Method 3 below and delete the other two.

Method 3: The Agency shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency of the contract work and pay retainage to the prime contractor based on these acceptances. The prime contractor or subcontractor shall return all monies withheld in retention from all subcontractors within seven (7) days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the Agency. Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval. Any violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor; deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.
229
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 35
Any violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified therein. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor.

2.I Bid Document Completion and Submittal

12.D General
Complete the forms provided in the Bid book.

Use the forms provided by the Department except as otherwise noted for a bidder's bond.

Submit the forms to the Office of the Town of Paradise Town Clerk at 5555 Skyway, Paradise, California 95969.

Do not fax forms.

All Bids must be made on the required Bid form(s). All blank spaces for Bid prices must be filled in, in ink or typewritten, and the Bid form must be fully completed and executed when submitted. Any corrections to entries made on Bid forms must be initialed by the person signing the Bid. In case of discrepancy between words and figures, words will prevail. Only one copy of the Bid form is required.

If an agent other than the authorized corporate officer or a partnership member signs the bid, file a Power of Attorney with the Department either before opening bids or with the bid. Otherwise, the bid may be nonresponsive.

Submit your bid and any Bid book forms after you submit your bid:

1. Under sealed cover

2. Marked as a bid

3. Identifying the contract number and the bid opening date Failure to submit the forms and information as specified may result in a nonresponsive bid.

22.D Required Items for Bid
In conformance with Public Contract Code Section 7106, a Noncollusion Affidavit is included in the Bid Book. Signing the Bid Book shall also constitute signature of the Noncollusion Affidavit.

Failure of the bidder to fulfill the requirements of the Special Provisions for submittals required to be furnished after bid opening, including but not limited to escrowed bid documents, where applicable, may subject the bidder to a determination of the bidder's responsibility in the event it is the apparent low bidder on a future public works contract. Incomplete submittal of bid documents may result in a non-responsive bid. The entire Bid Book does not need to be submitted with the Bid. It is the Bidder's responsibility to confirm the Bid includes all applicable forms, bonds and other attachments to remain a responsive bidder.

2.I-2.a List of Required Items for Bid
The following lists of items are required to submitted with the Bid:

1. Bid Cover Page

2. Bid Item List
230
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 36

3. Bidder’s List of Subcontractors (DBE and Non-DBE)- Part I & II; Exhibit 12-B (Can be submitted as directed in Section 2.I-2.d “DBE/Non-DBE Listing of Subcontractors” of these Special Provisions)

4. Equal Employment Opportunity Certification

5. Non-Lobbying Certification For Federal-Aid Contracts

6. Standard Form – LLL, “Disclosure of Lobbying Activities”, if needed. Refer to Section

7.G-2, “FHWA- Form 1273”, Part XI of these Special Provisions for more information.

7. Public Contract Code Statements and Questionnaire

8. Noncollusion Affidavit

9. Debarment and Suspension Certification

10. Opt-Out Form

11. Section 3 Forms 1-5

12. Bid Signature Page

13. Bidder’s Bond and Acknowledgment

14. Addenda Signature Page

2.I-2.b DBE/Non-DBE Listing of Subcontractors
Pursuant to Title 49, Section 26.11 of the Code of Federal Regulations, the Contractor must provide information on the list of subcontractors (regardless of amount of work performed).

Part 1 of this form information is required at the time bids are due. Part 2 of this form must be received by the Engineer no later than 4:00pm on the 5th calendar day after bid opening.

2.I-2.c Bid Form Submittal Schedules
The Bid book includes forms specific to the contract. The deadlines for the submittal of the forms vary depending on the requirements of each contract. Determine the requirements of the contract and submit the forms based on the applicable schedule specified as follows:

Submit all documents at the time of bid, with the exception of the provisions in Sections 2.J2.b and 2.J-2.c of these Special Provisions.

32.D Bidder’s Security
Submit one of the following forms of bidder's security equal to at least 10 percent of the bid:

1. Cash

2. Cashier's check

3. Certified check

4. Signed bidder's bond by an admitted surety insurer

5. For an electronic bid, electronic bidder's bond by an admitted surety insurer submitted using an electronic registry service approved by the Department.

Submit cash, cashier’s check, certified check, or bidder's bond to the Department at the Bidders Exchange before the bid opening time.

Submit electronic bidder’s bond with the electronic bid.

If using a bidder's bond, you may use the form in the Bid book. If you do not use the form in the Bid book, use a form containing the same information.

The bidder’s bond must conform to either the bond form page in this Bid Book, or on a form that conforms to it.

Attorneys-in-fact who sign bid bonds, payment bonds or performance bonds must file with each bond a certified and effective dated copy of their power of attorney. 231
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 37

2.J Bid Withdrawal
For a submitted bid:

1. An authorized agent may withdraw a bid before the bid opening date and time by submitting a written bid withdrawal request at the location where the bid was submitted. Withdrawing a bid does not prevent you from submitting a new bid.

2. After the bid opening time, you cannot withdraw a bid.

2.K Bid Opening
The Department publicly opens and reads bids at the time and place shown on the Notice to Bidders.

2.L Department’s Decision on Bid
The Department's decision on the bid amount is final.

The Department may reject:

1. All bids

2. A nonresponsive bid

2.M Bid Relief
The Department may grant bid relief under Pub Cont Code § 5100 et seq. Submit any request for bid relief to the Office Engineer. The Relief of Bid Request form is available at the Department's website.

2.N Submittal Failure History
The Department considers a bidder's past failure to submit documents required after bid opening in determining a bidder's responsibility.

2.O Bid Rigging
The U.S. Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800) 424- 9071. The service is available 24 hours 7 days a week and is confidential and anonymous. The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General.

2.P Addenda and Explanations to Bidders
Any explanation regarding the meaning or interpretation of Plans, Specifications, or other Contract Documents must be requested in writing, with sufficient allowance of time for receipt of reply before the time set for opening of Bids. Any such explanations or interpretations shall be made in the form of Addenda to the Documents and shall be furnished to all Bidders, who shall acknowledge receipt of all Addenda in their Bids.

Oral explanations and interpretations shall not be binding.

When obtaining and making payment for the Bid Book, bidder shall sign a bidders list, and provide contact information (address, fax number, email address and phone number) for the sole purpose of providing any addenda for the project. Bidder should put the contact information of where addenda should be sent/ received.

An addendum will be issued no sooner than ten (10) days prior to Bid Opening and no later than three (3) days before Bid Opening to document and memorialize the federal wage determination for the project.

Confirmation of bidder accepting addenda is required.
232
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 38
Section 3 Contract Award and Execution

3.A General
Refer to Section 3, "Contract Award and Execution" of the Standard Specifications and these special provisions for the requirements and conditions concerning award and execution of contract.

Sections 3-1.08 of the Standard Specifications shall not apply.

3.B Contract Award
Refer to Section 3-1.04 “Contract Award” of the Standard Specification is amended to read:

If the Department awards the contract, the award is made to the lowest responsible and responsive bidder within 60 days after bid opening. The Department may extend the specified award period if the bidder agrees.

13.D Bid Protest
Submit any bid protest to the Engineer. Bid protests are to be delivered to the following address:

TOWN OF PARADISE
Attn: Public Works Director
5555 Skyway, Paradise, CA 95969

3.B-1.a Bid Protest Procedure
i. The initial bid protest must be submitted in writing to the above address no later than 5PM of the 5th business day following bid opening.

1. The initial protest shall refer to both the Contract number and the specific portion of the document which forms the basis for the protest.

2. The initial protest shall include the name, address, telephone number and signature of the person representing the protesting party.

3. The party filing the initial protest shall concurrently transmit a copy of the initial protest document and any attached documentation to all other parties with a direct financial interest which may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.
ii. The protesting bidder shall submit to the Department a full and complete written statement specifying the grounds for the protest no later than 5 PM of the 5th business day following the submittal of the initial protest.
iii. The Department will issue a proposed decision on the protest. The final decision on any protest shall be made by the Town of Paradise Town Council prior to the award of the Contract. If the Board determines that a protest is frivolous, the party originating the protest may be determined to be irresponsible and that party may be determined to be ineligible for future contract awards.
iv. The procedure and time limits set forth in this paragraph are mandatory and are the Bidder’s sole and exclusive remedy in the event of Bid protest and failure to comply with these procedures shall constitute a failure to exhaust administrative remedies and a waiver of any right to further pursue the bid protest or otherwise challenge the bid award, including filing a Government Code Claim or legal proceedings.

23.D Bid Evaluation
The Town will evaluate all bids for this project based on the Base Project, followed by the Base Project plus an Alternate Bid Item (if provided), prioritized to determine which bid provides the greatest benefit 233
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 39
as determined by the Town within the specified Funding Amount. The contract, if awarded, will be awarded to the responsive and responsible bidder who submitted the lowest bid, as determined by the method set forth in Public Contract Code section 20103.8, subdivision (c), which provides that:
• The lowest bid shall be the lowest total of the bid prices on the base contract and those additive or deductive items that when taken in order from a specifically identified list of those items in the solicitation, and added to, or subtracted from, the base contract, are less than, or equal to, a funding amount publicly disclosed by the local agency before the first bid is opened.

The award of the contract, if it be awarded, will be to the lowest responsible, responsive bidder based upon the base bid, and any additive bid items chosen by the Town, whose bid complies with all the requirements prescribed.

If, at the time the contract is to be awarded, the total of the lowest acceptable Bid exceeds the funds then estimated by the Town as available, the Town may reject all bids or take such other action as best serves the Town's interests. In any case, the Town reserves the right to reject all bids.

33.D Investigation of Bidder
The Town may make such investigations as it deems reasonably necessary to determine the ability of the Bidder to perform the project work, and the Bidder shall furnish to the Town all such information and data for this purpose as the Town may request. The Town reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Town that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the project work contemplated therein.

3.C Contractor License
The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (Public Contract Code § 10164).

3.D Contract Bonds
The provisions of Section 3-1.05 of the Standard Specifications shall not apply.

The successful bidder shall furnish two bonds for the contract. As required under Section 9550 of the Civil Code, the successful bidder shall furnish a Payment Bond; provided that the bond shall be in the amount of onehundred percent (100%) of the contract price to guarantee the payment of claims of laborers, mechanics, or material men employed to work under the contract.

In addition, the bidder shall furnish a Performance Bond in the amount of one-hundred percent (100%) of the contract price to guarantee the faithful performance of the contract.

All alterations, extensions of time, extra and additional work, and other changes authorized by these specifications or any part of the contract may be made without securing the consent of the surety or sureties on the contract bonds.

Bond forms are provided with the Contract Documents.

Sureties on each of said bonds shall be satisfactory to the Town Attorney.

3.E Contract Execution
The provisions of Section 3-1.18, “Contract Execution” of the Standard Specifications shall be changed to read as follows:

The successful bidder must sign the Contract form included in the Bid Book. 234
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 40
After Award of the Contract by the Town, the Engineer will issue a “Notice of Award”, which includes applicable contract documents. Upon Receipt of the Notice of Award, deliver to the Engineer:

1. Signed Contract form

2. Contract bonds

3. Documents identified in Section 3-1.07 of the Standard Specifications, “Insurance Policies”

4. Payee Data Record

5. For a Federal-Aid contract, Caltrans Bidder - DBE Information form These contract documents must be received by the Engineer before the 10th business day after the bidder receives the contract.

Executed contract documents shall be delivered to the following address:

TOWN OF PARADISE, DEPARTMENT OF PUBLIC WORKS
5555 SKYWAY, PARADISE, CALIFORNIA 95969
The bidder's security may be forfeited for failure to execute the contract within the time specified.

3.F Bidder’s Securities
The provisions of Section 3-1.19, “Bidders’ Securities” of the Standard Specifications shall be changed to read as follows:

Failure of the lowest responsible bidder, the second lowest responsible bidder, or the third lowest responsible bidder to execute the contract as required in Section 3.E “Contract Execution," within 10 business days of receiving the contract for execution shall be just cause for the forfeiture of the Bid guaranty. The successful bidder may file with the Department a written notice, signed by the bidder or the bidder's authorized representative, specifying that the bidder will refuse to execute the contract if it is presented. The filing of this notice shall have the same force and effect as the failure of the bidder to execute the contract and furnish acceptable bonds within the time specified.

Section 4 Scope of Work

4.A General
Refer to Section 4, "Scope of Work" of the Standard Specifications and these special provisions for the requirements and conditions concerning scope of work.

4.B Location of Work
• The project is located on various roads within the Town of Paradise, California.

4.C Contract Documents Provided to Contractor
The Engineer will furnish to the Contractor, upon request and free of charge, one (1) copy of Contract Documents. Additional copies of Contract Documents or Plans may be obtained upon request by paying appropriate costs for reproduction. Electronic files may be provided by the Engineer upon request. Prior to release of electronic files, the Town’s Electronic File(s) Liability Letter shall be executed by the contractor.

4.D Change Orders – General
The provisions of Section 4-1.05A, “General” of the Standard Specifications shall be changed to read as follows:

The Department may make changes within the scope of work and add extra work, subject to the limitations of Section 20395, subdivision (d) of the Public Contract Code. The Engineer describes the changes and extra work, the payment basis, and any time adjustment in a Change Order. 235
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 41
A Change Order is approved when the Department signs the Change Order.

Until the Department approves a Change Order, continue to perform the work under the Contract. If ordered in writing by the Engineer, you shall proceed with the work so ordered prior to actual receipt of an approved contract change order therefor. In those cases, the Engineer will, as soon as practicable, issue an approved contract change order for the ordered work.

Submit detailed cost data for a unit price adjustment for a bid item if:

1. the Engineer requests the data or,

2. you request a unit price adjustment resulting from a change of more than 25 percent in the bid item's quantity.

Refer to Section 5-1.27E, “Change Order Bills”.

4.E Differing Site Conditions
The provisions of Section 4-1.06, “Differing Site Conditions” of the Standard Specifications shall be changed to read as follows:

14.D Differing Site Conditions

1. During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.

2. Upon written notification, the engineer will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted.

3. No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice.

4. No contract adjustment will be allowed under this clause for any effects caused on unchanged work. (This provision may be omitted by the Local Agency, at their option.)

24.D Suspensions of Work Ordered by the Engineer

1. If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment.

2. Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit) and modify the contract in 236
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 42
writing accordingly. The contractor will be notified of the engineer's determination whether or not an adjustment of the contract is warranted.

3. No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed.

4. No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract.

34.D Significant Changes in the Character of Work

1. The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.

2. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract.

The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable.

3. If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contract, the altered work will be paid for as provided elsewhere in the contract.

4. The term “significant change” shall be construed to apply only to the following circumstances:
• When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or
• When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed.

Section 5 Control of Work

5.A General
The bidder's attention is directed to the provisions in Section 5 “Control of Work” of the Standard Specifications and these Special Provisions.

5.B Contract Components
Modify the 3rd paragraphs of section 5-1.02 to read:

1. Governing ranking of Contract parts in descending order is:

1.1. Town of Paradise Owner-Contractor Agreement

1.2. Special provisions

1.3. Project plans
237
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 43

1.4. Revised standard specifications

1.5. Standard specifications

1.6. Revised standard plans

1.7. Standard plans

1.8. Supplemental project information
Sections 5-1.13C and 5-1.13D of the Standard Specifications shall not apply.

5.C Subcontracting

5.D Coordination with Other Entities
Refer to Section 5-1.20 “Coordination with Other Entities” of the Standard Specifications, the following provision are added:

Utility facilities shown on the plans are based on the best available information provided by the utility owners, field observations, and as-builts. You are notified that Camp Fire recovery efforts are on-going, which include installation and reconfiguration of existing utilities within the Town’s limits. The ongoing utility work includes migration of overhead utility lines to underground, rehabilitation of water mains and appurtenances, repair or replacement of storm drain facilities, and reestablishing telecommunication and power service to residences and businesses. The scope of work and schedule for the utility work associated with the Camp Fire recovery is unknown at this time, and the utilities shown on the plans are subject to change. Contractor may have to coordinate with utility activities to avoid delays. Prior to excavation activities, you will verify the locations of the utilities shown on the plans. If conflicts are identified as part of the supplemental utility investigation, notify the Engineer.

The contractor will be required to positively identify the location of all underground utilities including high priority utilities per the California Government Code and Caltrans requirement within the project area before any excavation activities take place.

CONTRACTOR shall be responsible for potholing tie-in locations in advance of work and notifying ENGINEER of any conditions varying from what is shown on drawings. In advance of performing any work for installation of tees, tie-ins or water mains, CONTRACTOR shall coordinate with PID regarding the associated shut off of existing water mains. CONTRACTOR shall coordinate with PID to perform the installation of tees located on water mains and compensate PID for each tee installation performed by PID based on the time and number of PID staff required to complete the installation. PID shall be responsible for operating valves to facilitate the shut off during the tie-in. CONTRACTOR shall be responsible for flushing all water mains that were shut off during the outage.

5.E Construction Water
The Contractor can obtain construction water for construction by making arrangements with Paradise Irrigation District (530) 877-4971 for a temporary hydrant meter.

Full compensation for developing, maintaining, and distributing construction water will be considered as included in the contract price paid for the various items of project work and no additional compensation will be allowed therefor.
238
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 44

5.F Permits, Licenses, Agreements and Certifications – After Award Add to the end of the first paragraph in Section 5-1.20B(3), “After Award”:

Confirm with the Engineer which after-award PLACs are obtained by the Department and which are obtained by the Contractor. Unless otherwise specified by the Engineer in writing, all after-award PLACs are to be obtained by the Contractor.

To make a change to an after-award PLAC obtained by the Department, submit the proposed change. The Department sends the proposed change to the appropriate authority for consideration.

Obtain those PLACs to be issued to you and pay fees and costs associated with obtaining them. Submit copies of Contractor-obtained after-award PLACs for review.

5.G Submittals
Refer to Section 5-1.23, “Submittals” of the Standard Specifications and the following provisions

15.D General
Section 5-1.23A, “General” is amended as follows:

Replace the 4th paragraph of Section 5-1.23A with:

Each sheet of a submittal must include a cover sheet with the following information:

1. Contract number

2. Local Agency–Route–Post Mile/ Station (if applicable)

3. Contractor’s name and contact information

4. Date of Submittal

5. Submittal Number

6. Numbered in reference to the Bid Item Number/ List. If there is no bid item that applies to the submittal, the submittal shall be appropriately identified as to the subject matter.

7. Structure name and number, if any

25.D Action Submittals
Section 5-1.23B, “Action Submittals” is amended with the following provisions:

Modify the 4th paragraphs of section 5-1.23B(1) to read:

Except for shop drawings and test samples, provide two (2) copies of the submittal. Allow 15 days for review.

35.D As-Built Plans
Contractor shall provide the Town with a set of As-Built drawings at the end of the project. As-Built drawings shall be maintained and updated throughout construction, at the end of the project. As-Built drawings shall identify at a minimum all installations of typical and non-typical materials.

5.H Construction Surveys
Refer to Section 5-1.26, “Construction Surveys” of the Standard Specifications, which is deleted and replaced with the following provisions:

The Contractor must provide stakes and marks under Chapter 12, "Construction Surveys," of Caltrans’s Surveys Manual, or as needed and approved by the Engineer. The survey manual may be obtained at the Town Department of Public Works or at the following web address:
http://www.dot.ca.gov/hq/row/landsurveys/SurveysManual/Manual_TOC.html 239
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 45
Section 12.5 “Typical State-Furnished Control Stakes” of the Survey’s Manual is amended as follows:

12.5-1 Clearing Stakes may be placed less than 100 feet longitudinally as needed.

Preserve stakes and marks placed by your forces. If the stakes or marks are destroyed, the Department will not replace or pay for replacement staking. Re-staking costs will be borne by the Contractor.

Full compensation for construction surveying will be considered as included in the contract price paid for the various items of work and no additional compensation will be allowed therefor.

5.I Records
The Contractor agrees to provide the Town of Paradise, the FEMA Administrator, the Comptroller General of the United States, or any of their authorized representatives access to any books, documents, papers, and records of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts, and transcriptions.

The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed.

The Contractor agrees to provide the FEMA Administrator or his authorized representatives access to construction or other work sites pertaining to the work being completed under the contract.

In compliance with the Disaster Recovery Act of 2018, the Town of Paradise and the Contractor acknowledge and agree that no language in this contract is intended to prohibit audits or internal reviews by the FEMA Administrator or the Comptroller General of the United States.

Section 5-1.27E “Change Order Bills” of the Standard Specifications is amended to delete any reference to online or “internet change order billing system”. Change order bills shall be submitted hard copy and shall adhere to Section 5-1.23 “Submittals” of the Standard Specifications.

5.J Construction Limits
The Contractor shall confine his operations to designated property, road rights-of-way, existing easements, or as identified and designated on the Plans.

5.K Temporary Use Permit
Any encroachment onto lands outside of the designated construction limits will require the contractor to apply for a temporary use permit in accordance with Paradise Municipal Code Section 17.32.200. The application shall include a site plan, description of the proposed use and a written agreement which shows a right-of-entry, temporary construction easement, proof of ownership or other form of right to use such land(s) PRIOR to the encroachment or use of such lands.

Contractor shall acknowledge, understand and comply with the limitations of activities relating to the approved CEQA and NEPA environmental documents which may limit scope of impacts. Failure to comply with the environmental provisions shall result in the immediate suspension of all work until the provisions have been met.

Application shall be made at least nine (9) business days prior to the requested commencement date of the temporary use, and the planning director shall make a determination whether to approve, conditionally approve, or deny the proposed temporary use within five (5) business days after the date of application is determined complete for processing. The temporary use permit cost will be the responsibility of the contractor and shall be paid in full to the Town’s Planning Department. 240
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 46

5.L Vandalism
The Contractor is responsible for the protection of the entire jobsite, including protecting the fresh concrete against vandalism and damage. Any damaged concrete will be repaired or replaced as determined by the Engineer. Any additional security measures required to protect against vandalism will be included in the respective individual items and no additional compensation will be allowed.

Full compensation for vandalism control will be considered as included in the contract price paid for the various items of work and no additional compensation will be allowed therefor.

5.M Property and Facility Preservation
Attention is directed to Section 5-1.36 “Property and Facility Preservation” of the Standard Specifications.

Contractor shall adequately cover and protect all utility lids, vaults and manholes when placing Hot Mix Asphalt or performing Pavement Reclamation activities. Contractor shall perform a pre-construction lid assessment, including station and offset or GPS coordinates, to determine the location and quantity of lids to be covered.

This list shall be verified during construction and checked for quality assurance post-construction to prevent any lids being inadvertently covered.

The Town of Paradise is not a part of the Underground Service Alert (USA). Contractor shall call the Town of Paradise Public Works Department at least 2 working days prior to performing any excavation near Town owned subsurface installations, including, but not limited to Storm Water, Sewer, street lighting and traffic signal equipment.

15.D Non-Highway Facilities
Section 5-1.36C “Nonhighway Facilities” are amended as follows:

Add between the 2nd and 3rd paragraphs of section 5-1.36C(3):

No valves or other controls on existing utility systems shall be operated for any purpose by the Contractor without prior approval of the Engineer and/or the utility company.

25.D Monument Preservation and Re-Establishment
Section 5-1.36D “Survey Monuments” are amended as follows:

Contractor shall review section 8771 and section 8725 of the business and professions code and section 605 of the California Penal Code to ensure that monument conservation has been properly addressed. Any monuments to be disturbed as a result of construction activities will require preconstruction and post construction Corner Records or a Record of Survey performed by a Licensed Surveyor.

The contractor is responsible for perpetuating, preserving, and re-establishing all survey monumentation. Prior to construction, all monuments shall be located and referenced by or under the direction of a licensed land surveyor. If based upon record research, no monuments exist, then a statement from a licensed Land surveyor that no monuments exist will be sufficient.

A corner record or record of survey of the references shall be filed with the county surveyor. If the monument is inside an existing monument box, the contractor shall attempt to reuse the box. After roadway construction is complete contractor shall have a Licensed Surveyor to mark the location for the placement of the monument box and contractor shall install the monument box and lid to finished grade then the contractor shall have a Licensed Surveyor install the monument inside the existing box and complete post project corner records or a record of survey shall be filed at the completion of the project.
241
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 47

5.N Final Inspection and Contract Acceptance
Attention is directed to the provisions in Section 5-1.46 “Final Inspection and Contract Acceptance” of the Standard Specifications, which is amended to read:

When you complete the work, request the Engineer's final inspection. The Engineer will promptly inspect the project work.

If the Engineer determines that the work is complete, the Engineer recommends Contract acceptance.

Immediately after Contract acceptance, you are relieved from:

1. Maintenance and protection duties.

2. Responsibility for injury to persons or property or damage to the work occurring after Contract acceptance except as specified in section 5-1.47 of the Standard Specifications.

If the Engineer determines that the work is not complete, the Engineer will develop a final punch list, and the Contractor will be notified in writing of any defects or deficiencies to be remedied. When notified that this project work has been completed, the Engineer will again inspect the project work and when satisfied that all project work has been done in accordance with the contract drawings and these Special Provisions, he will recommend to the Town Council that they formally accept the contract as complete. The completion date, for purposes of computing “Time for Completion” and liquidated damages, if any, will be considered to be the date of Contractor’s first written completion notice, provided that, in the Engineer’s judgment, the project work is substantially complete and operational at that time.

Section 6 Control of Materials

6.A General
Refer to Section 6 ”Control of Materials” of the Standard Specifications.

6.B Procurement of Recovered Materials
In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired—

1. Competitively within a timeframe providing for compliance with the contract performance schedule;

2. Meeting contract performance requirements; or

3. At a reasonable price.

Information about this requirement, along with the list of EPA- designated items, is available at EPA’s Comprehensive Procurement Guidelines web site,
https://www.epa.gov/smm/comprehensive- procurement-guideline-cpg-program.

The Contractor also agrees to comply with all other applicable requirements of Section 6002 of the Solid Waste Disposal Act.

6.C Authorized Materials List
The Department adopts Caltrans’s maintained Pre-Qualified Products List (Authorized Materials List) for various construction materials, and can be found at: http://www.dot.ca.gov/hq/esc/approved_products_list/ Materials may be used or specified to be on this maintained list. The Engineer shall not be precluded from sampling and testing products on the Pre-Qualified Products List. 242
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 48
The manufacturer of products on the list of Prequalified and Tested Signing and Delineation Materials shall furnish the Engineer a Certificate of Compliance in conformance with the provisions in Section 6-3.05E, "Certificates of Compliance," of the Standard Specifications for each type of material supplied that applies to this list.

For those categories of materials included on the Pre-Qualified Products List, only those products shown within the listing may be used in the work. Other categories of products, not included on the list of Prequalified and Tested Signing and Delineation Materials, may be used in the work provided they conform to the requirements of the Standard Specifications.

Materials and products may be added to the Pre-Qualified Products List if the manufacturer submits a New Product Information Form to the New Product Coordinator at the Transportation Laboratory. Upon a Departmental request for samples, sufficient samples shall be submitted to permit performance of required tests. Approval of materials or products will depend upon compliance with the specifications and tests the Department may elect to perform.

6.D Buy America
Replace section 6-1.04 with:

16.D 6-1.04 BUY AMERICA

26.D 6-1.04A General
Buy America requirements do not apply to the following:

1. Tools and construction equipment used in performing the work

2. Temporary work that is not incorporated into the finished project

36.D 6-1.04B Crumb Rubber (Pub Res Code § 42703(d))
Furnish crumb rubber with a certificate of compliance. Crumb rubber must be:

1. Produced in the United States

2. Derived from waste tires taken from vehicles owned and operated in the United States

46.D 6-1.04C Steel and Iron Materials
Steel and iron materials must be melted and manufactured in the United States except:

1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials

2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total bid or $2,500, the material may be used if authorized Furnish steel and iron materials to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured.

All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.
243
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 49

56.D 6-1.04D Manufactured Products
Iron and steel used in precast concrete manufactured products must meet the requirements of section 6-

1.04C regardless of the amount used.

Iron and steel used in other manufactured products must meet the requirements of section 6-1.04C if the weight of steel and iron components constitute 90 percent or more of the total weight of the manufactured product.

66.D 6-1.04E Construction Materials
Buy America requirements apply to the following construction materials unless otherwise specified:

1. Non-ferrous metals

2. Plastic and polymer-based products such as:

2.1. Polyvinylchloride

2.2. Composite building materials

2.3. Polymers used in fiber optic cables

3. Glass

4. Lumber

5. Drywall
Where one or more of these construction materials have been combined by a manufacturer with other materials through a manufacturing process, Buy America requirements do not apply unless otherwise specified.

Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to Buy America compliance.

All manufacturing processes for these materials must occur in the United States

6.E Buy Clean California Act
Replace section 6-1.06 of the RSS with:

16.D 6-1.06A Summary
For projects with a total bid over $1 million and 175 or more original working days, the materials or products shown in the following table are subject to the Buy Clean California Act (Pub Cont Code § 3500 et seq.):
244
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 50
a For each mill providing 20,000 pounds or more on the project b For each mill providing 5,000 pounds or more on the project c For each manufacturer providing 2,000 square feet or more on the project d For each manufacturer providing 4,000 square feet or more on the project An informal-bid contract is not subject to Buy Clean California Act requirements.

For carbon steel rebar material subject to Buy Clean California Act, the source mill must be on the Authorized Material List for Buy Clean California Act compliant steel mills. Identify source mills on Notice of Materials to be Used form submittals.

For structural steel, flat glass, and mineral wool board insulation subject to Buy Clean California Act, submit an environmental product declaration for each applicable material or product at least 15 days before scheduled installation. The global warming potential of each applicable material or product as evidenced by its environmental product declaration shall not exceed the maximum acceptable global warming potential values established by the Department of General Services. Do not install the applicable material or product until the submittal has been authorized. The maximum acceptable global warming potential for each category of material or product is published on the Department of General Services website at:
https://www.dgs.ca.gov/
For product category rules for structural steel, flat glass, or mineral wool board insulation, go to the METS website. Use the product category rule in effect on the date of bid opening unless otherwise authorized.

An environmental product declaration for structural steel, flat glass, or mineral wool board is not required for either of the following conditions:

1. Applicable product category rule has expired without replacement as of the bid opening date.

2. Applicable product category rule was issued less than 100 days before the bid opening date.

Upon each jobsite shipment receipt of materials or products subject to these Buy Clean California Act requirements, report the represented quantity information using the Department’s Data Interchange for Materials Engineering.

26.D 6-1.06B Definitions
environmental product declaration: Independently verified document created and verified under International Organization for Standardization (ISO) 14025 for Type III environmental declarations that identifies the global warming potential emissions of the facility-specific material or product through a product stage life cycle assessment.
product category rule: Program operator established rule based on the science of life cycle assessment that governs the development of the environmental product declaration for the material or product. product stage: Boundary of the environmental product declaration that includes (1) raw material supply, 245
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 51
(2) transportation processes, and (3) processing operations, including operations such as melting, mixing, milling, finishing, curing, cooling, trimming, packaging and loading for transport delivery.

Commonly referred to as a "cradle-to-gate" life cycle assessment. program operator: Independent agency that supervises and confirms the full environmental product declaration development process under ISO 14025.
raw material supply: Upstream processes which can include allocations, extraction, refinement, reclamation, handling and processing of the constituents used in producing the material or product. transportation processes: Includes transportation of raw, reclaimed or recycled material constituents from the supplier to the gate of the manufacturer, producer or fabricator. Includes transport of related waste products.

36.D 6-1.06C Submittals
You must register on the Department’s Data Interchange for Materials Engineering at least 15 days before submitting either of the following:

1. Represented quantity information for materials or products subject to Buy Clean California Act

2. Environmental product declarations for structural steel, flat glass, or mineral wool board insulation Follow the registration process at:
https://dime.dot.ca.gov/
Submit environmental product declarations for structural steel, flat glass, and mineral wool board insulation to the Department’s Data Interchange for Materials Engineering and provide PDF copies to the Engineer.

Submit certified mill test reports upon delivery of carbon steel rebar and structural steel materials to the project documenting their compliance. Do not incorporate these materials and products into the work until compliant documentation has been provided to the Engineer.

For each material or product subject to Buy Clean California Act requirements, complete the represented quantity information on the Department’s Data Interchange for Materials Engineering within 5 business days of shipment receipt at the project site.

Immediately notify the Engineer if a program operator has determined their product category rule does not allow for development of a facility-specific environmental product declaration for structural steel, flat glass, or mineral wool board insulation. Include written correspondence from the program operator. If the Engineer determines the development of a facility-specific environmental product declaration for structural steel, flat glass, or mineral wool board insulation cannot be achieved, an environmental product declaration will not be required for that material or product.

46.D 6-1.06D Quality Assurance
Not Used

6.F Quality Assurance
The following shall be added as an eighth paragraph to Section 6-2.01A “General” of the Quality Assurance subsection of the Standard Specifications which refers to typical Caltrans Test Methods:

The Agency uses a Quality Assurance Program (QAP) to ensure a material is produced to comply with the Contract. The Quality Assurance Program is formally incorporated into this contract.

You may examine the records and reports of tests the Agency performs if they are available at the job site. 246
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 52
Schedule project work to allow time for QAP.

Section 7 Legal Relations and Responsibility to the Public

7.A General
Refer to Section 7, ”Legal Relations and Responsibility to the Public” of the Standard Specifications.

7.B Prevailing Wage
Attention is directed to Section 7-1.02K, “Labor Code” of the Standard Specifications are amended to modify the following provisions:

Contractor and subcontractors are directed to the Department of Industrial Relations website for further information and online registration information; http://www.dir.ca.gov/Public-Works/PublicWorks.html .

In accordance with §§ 1771.4 (a) (1), this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

The Department does not utilize a Labor Compliance Plan, and therefore California Labor Code 1771.4 and 1771.6 shall apply to this project.

17.D Wages
Attention is directed to Section 7-1.02K(2), “Wages” of the Standard Specifications are amended to include the following provisions:

If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor the Contractor and subcontractors shall pay not less than the higher wage rate. See Section IV of the Federal provisions. This includes "helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question.

The general prevailing wage rates determined by the Director of Industrial Relations, for the county or counties in which the work is to be done, are available at the Department of Public Works address.

Changes, if any, to the general prevailing wage rates will be available at the same location.

The minimum wage rates for the Director of the California Department of Industrial Relations can be found at: http://www.dir.ca.gov/DLSR/PWD/index.htm
The Contractor's attention is directed to California Labor Code 1815 and 40 U.S.C 3701-3708 regarding overtime pay and the requirement that penalties in accordance with current applicable Labor Codes will be levied for each workman for each calendar day during which the overtime pay provision is not met. The Contractor's attention is also directed to the requirements for travel and subsistence payments to all workers needed to execute the Contract.

27.D Certified Payroll Records (Labor Code 1776)
Attention is directed to Section 7-1.02K(3), “Certified Payroll Records” of the Standard Specifications are amended to include the following provisions:

Electronic submittal of certified payroll records in Section 7-1.02K(3) “Certified Payroll Records” of the Standard Specifications are amended to delete electronic (email) submittal provisions. Electronic 247
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 53
submittals of certified payroll records will not be accepted. Submittals shall be original hard copies of required documents. Submittal of payroll records shall continue to be submitted on a weekly basis as specified in the Standard Specifications.

In accordance with Labor Code §§ 1771.4, all CPRs must be submitted electronically to DIR in addition to original hard copies to the Department. Attention is directed to the DIR website for electronic submittal instructions.

7.C Occupation Safety and Health Standards
Attention is directed to Section 7-1.02K(6) “Occupational Safety and Health Standards” and subsection 7-

1.02K(6)(b) “Excavation Safety”. For an excavation 5 feet or more in depth, submit shop drawings for a protective system. No additional payment shall be made to contractor for temporary shoring required by OSHA guidelines.

7.D Lead Compliance
Attention is directed to Section 7-1.02K(6)(j)(ii), “Lead Compliance Plan” of the Standard Specifications.

7.E Public Convenience
Refer to Section 7-1.03, “Public Convenience” of the Standard Specifications are amended to include the following provisions:

17.D Working Hours Restrictions
Reference Section 7-1.02K(5) “Working Hours” of the Standard Specification and as amended in these Special Provisions.

Work on Saturdays, Sundays, or Holidays will not be allowed, unless otherwise stated or approved in advance by the Engineer and the Contractor is willing to pay the fully burdened rate for the Town Construction Inspector costs. The Contractor shall notify the Engineer in writing of Contractor’s project work schedule including hours to be worked and days off. The Contractor's representative shall be available at the project work site during the hours indicated in the project work schedule. The project work schedule will be used by the Engineer to schedule construction observation personnel. No project work shall be permitted outside the hours and days indicated by the schedule unless otherwise approved by the Engineer.

Contractor must keep their hours of work between 7 AM and 7 PM.

For both daytime and night-time project work, the contractor shall submit a detailed traffic plan that demonstrates that their operations will not interfere with or cause undue traffic queue delays (> 10 minutes).

The Contractor shall present their traffic control plan to the Engineer for approval prior to the pre-job conference. Contractor may propose performance of other operations of project work during night time hours for approval of the Engineer.

27.D Driveway Access
Reference Section 7-1.03 “Public Convenience” of the Standard Specification and as amended in these Special Provisions.

Driveway access must be maintained at all times to all occupied residences and businesses. Property owners shall be given 2-weeks advanced notification of impacts to their driveway(s). For occupied businesses and residences with only one driveway, construct the driveways in two halves where feasible or temporarily close the drive for up to 4 hours (or as permitted in writing by owner). 248
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 54
Driveways to vacant or unoccupied properties may be temporarily closed if no objection is received from the owner within 2 weeks of notification.

7.F Public Safety
Attention is directed to Section 7-1.04, “Public Safety” of the Standard Specifications are amended so that all work related to covering, maintaining and removing sign covers on all signs shall not be change order work, but shall be included in the contract price paid for various bid items and no additional compensation will be allowed therefor.

Section 7-1.04, “Public Safety” of the Standard Specifications are amended to include the following:

The duty of the Engineer to conduct construction review of the Contractor’s performance is not intended to include review of the adequacy of the Contractor’s safety measures in, on or near the construction site.

If death or serious injuries or serious damages are caused, the accident shall be reported immediately by telephone or messenger to both the Engineer and the Owner. In addition, the Contractor must promptly report in writing to the Engineer all accidents whatsoever arising out of, or in connection with, the performance of the project work whether on, or adjacent to the site, giving full details and statements of witnesses.

Personal vehicles of the Contractor's employees shall not be parked on the traveled way or shoulders, including any section closed to the public
The Contractor shall ensure and guarantee that any traffic control devices removed or damaged by Contractor’s operation are reinstalled and in good repair before leaving the project work site.

Contractor shall assume full responsibility for clearing the streets of parked vehicles or other obstructions located within the area of project work.

7.G Indemnification – General
The provisions of Section 7-1.05A, “General” of the Standard Specifications shall be changed to read as follows:

The Town of Paradise and all officers and employees thereof connected with the project work, including but not limited to the Director and the Engineer, shall not be answerable or accountable in any manner for any loss or damage that may happen to the project work or any part thereof; for any loss or damage to any of the materials or other things used or employed in performing the project work; for injury to or death of any person, either workers or the public; or for damage to property from any cause which might have been prevented by the Contractor, or Contractor’s workers, or anyone employed by Contractor.

The Contractor shall be responsible for any liability imposed by law and for injuries to or death of any person, including but not limited to workers and the public, or damage to property resulting from defects or obstructions or from any cause whatsoever during the progress of the project work or at any time before its completion and final acceptance.

The Contractor shall indemnify and save harmless the Town of Paradise and all officers and employees thereof connected with the project work, including but not limited to the Director and the Engineer, from all claims, suits or actions of every name, kind and description, brought forth, or on account of, injuries to or death of any person, including but not limited to workers and the public, or damage to property resulting from the performance of a contract, except as otherwise provided by statute. The duty of the Contractor to indemnify and save harmless includes the duties to defend as set forth in Section 2778 of the Civil Code.
249
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 55
With respect to third party claims against the Contractor, the Contractor waives any and all rights to any type of express or implied indemnity against the Town, its officers or employees.

You must, at your own expense, defend any suit or action founded upon a claim of the foregoing.

7.H Insurance
Attention is directed to the provisions in Section 7-1.06 “Insurance”. Sections 7-1.06C thru 7-1.06F are replaced with the following provisions:

The Contractor, in advance of performing any project work on the project under the contract between the Town and the Contractor, shall, at no expense to the Town:

The Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the project work hereunder by the Contractor, Contractor’s, her or its agents, representatives, employees or subcontractors.

Coverage shall be at least as broad as:

1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01), including products and completed operations.

2. Insurance Services Office form number CA 00 01 (Ed. 1/87) covering Automobile Liability, code 1 (any auto).

3. Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance.

4. Builders Risk (Course of Construction) insurance utilizing an “All Risk”(Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions.

Contractor shall maintain limits no less than:

1. Commercial General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: $2,000,000 per accident for bodily injury and property damage.

3. Employer’s Liability: $1,000,000 or more per accident for bodily injury or disease.

4. Builders Risk (Course of Construction): Completed value of the project.

Any deductibles or self-insured retention must be declared to and approved by the Town. At the option of the Town, either: the insurer shall reduce or eliminate such deductibles or self-insured retention as respects the Town, its officers, officials, employees and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the Town guaranteeing payment of losses and related investigations, claim administration and defense expenses.

The general liability and automobile liability policies shall contain, or be endorsed to contain, the following provisions:

1. The Town, its officers, officials, employees, and volunteers shall be covered as additional insured with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the contractor; and with respect to liability arising out of project work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such project 250
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 56
work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance, or as a separate owner’s policy.

2. For any claims related to this project, the Contractor’s insurance coverage shall be primary insurance as respects the Town, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Town, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party, except after thirty (30) days’ prior written notice by certified mail, return receipt requested, has been given to the Town.

The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, including, but not limited to, primary and non-contributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General Liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Contractor’s primary and excess liability policies are exhausted.

Builders Risk (Course of construction) policies shall contain the following provision:

1. The Town shall be named as loss payee.

Insurance shall be placed with insurers authorized to conduct business in the state with a current A.M.

Best’s rating of no less than A:VII.

Contractor shall furnish the Town with original certificates and amendatory endorsements effecting coverage required by this clause. The endorsements should be on forms provided by the Town or on other than the Town’s forms, provided those endorsements or policies conform to the requirements.

All certificates and endorsements are to be received and approved by the Town before project work commences. The Town reserves the right to require complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications at any time.

Contractor shall include all subcontractors as insured under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein.

All liability insurance policies shall be maintained for the duration of project construction and for 3 years after completion of the project.

Contractor hereby agrees to waive rights of subrogation that any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the Town for all project work performed by the Contractor, its employees, agents and subcontractors.

7.I Federal Laws for Federal-Aid Contracts
Replace Section 7-1.11, “Federal Laws for Federal-Aid Contacts” of the Standard Specifications with the provisions within this section.
251
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 57
This project is funded with Federal Emergency Management Agency (FEMA) - (Project # 130763).

A copy of form FHWA-1273 is included in the proposed contract. The training and promotion section of section II refers to training provisions as if they were included in the special provisions. The Department specifies the provisions in section 7-1.11D of the Standard Specifications. If a number of trainees or apprentices is required, the Department shows the number on the Notice to Bidders.

Interpret each FHWA-1273 clause shown in the following table as having the same meaning as the corresponding Department clause:

FHWA-1273 Nondiscrimination Clauses
FHWA-1273 section FHWA-1273 clause Department clause
Training and Promotion In the event a special provision for training is provided under
this contract, this subparagraph
will be superseded as indicated
in the special provision.

If section 7-1.11D applies,
section 7-1.11D supersedes this
subparagraph.

Records and Reports If on-the-job training is being
required by special provision,
the contractor will be required
to collect and report training
data.

If the Contract requires on-thejob training, collect and report training data.

17.D Female and Minority Goals
To comply with Section II, "Nondiscrimination," of "Required Contract Provisions Federal-Aid Construction Contracts," the following are goals for female and minority utilization goals for Federalaid construction contracts and subcontracts that exceed $10,000:

The nationwide goal for female utilization is 6.9 percent.

The goals for minority utilization [45 Fed Reg 65984 (10/3/1980)] are as follows:

MINORITY UTILIZATION GOALS
Economic Area Goal
174
Redding CA:

Non-SMSA (Standard Metropolitan Statistical Area) Counties: 6.8 CA Lassen; CA Modoc; CA Plumas; CA Shasta; CA Siskiyou; CA Tehama 175
Eureka, CA
Non-SMSA Counties: 6.6
CA Del Norte; CA Humboldt; CA Trinity
176
San Francisco-Oakland-San Jose, CA:

SMSA Counties:
7120 Salinas-Seaside-Monterey, CA 28.9
CA Monterey
7360 San Francisco-Oakland 25.6
252
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 58
CA Alameda; CA Contra Costa; CA Marin; CA San Francisco; CA San Mateo 7400 San Jose, CA
CA Santa Clara, CA 19.6
7485 Santa Cruz, CA
CA Santa Cruz 14.9
7500 Santa Rosa
CA Sonoma 9.1
8720 Vallejo-Fairfield-Napa, CA
CA Napa; CA Solano 17.1
Non-SMSA Counties:

CA Lake; CA Mendocino; CA San Benito 23.2
177
Sacramento, CA:

SMSA Counties:
6920 Sacramento, CA 16.1
CA Placer; CA Sacramento; CA Yolo
Non-SMSA Counties 14.3
CA Butte; CA Colusa; CA El Dorado; CA Glenn; CA Nevada; CA Sierra; CA Sutter; CA Yuba 178
Stockton-Modesto, CA:

SMSA Counties:
5170 Modesto, CA 12.3
CA Stanislaus
8120 Stockton, CA 24.3
CA San Joaquin
Non-SMSA Counties 19.8
CA Alpine; CA Amador; CA Calaveras; CA Mariposa; CA Merced; CA Tuolumne 179
Fresno-Bakersfield, CA
SMSA Counties:
0680 Bakersfield, CA 19.1
CA Kern
2840 Fresno, CA 26.1
CA Fresno
Non-SMSA Counties: 23.6
CA Kings; CA Madera; CA Tulare
180
Los Angeles, CA:

SMSA Counties:
253
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 59
0360 Anaheim-Santa Ana-Garden Grove, CA 11.9
CA Orange
4480 Los Angeles-Long Beach, CA 28.3
CA Los Angeles
6000 Oxnard-Simi Valley-Ventura, CA 21.5
CA Ventura
6780 Riverside-San Bernardino-Ontario, CA 19
CA Riverside; CA San Bernardino
7480 Santa Barbara-Santa Maria-Lompoc, CA 19.7
CA Santa Barbara
Non-SMSA Counties 24.6
CA Inyo; CA Mono; CA San Luis Obispo
181
San Diego, CA:

SMSA Counties
7320 San Diego, CA 16.9
CA San Diego
Non-SMSA Counties 18.2
CA Imperial
For each full week of July during which project work is performed under the contract, the prime contractor and each non material-supplier subcontractor with a subcontract of $10,000 or more must complete Form FHWA PR-1391 (Appendix C to 23 CFR 230). Submit the forms by August 15.

27.D Federal Trainee Program
For the Federal training program, the number of trainees or apprentices is 0.

This section applies if a number of trainees or apprentices is specified in the special provisions.

As part of the prime contractor’s equal opportunity affirmative action program, provide on-the-job training to develop full journeymen in the types of trades or job classifications involved.

The Prime Contractor has primary responsibility for meeting this training requirement.

If the prime contract subcontracts a contract part, they shall determine how many trainees or apprentices are to be trained by the subcontractor. Include these training requirements in each subcontract.

Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1st year of apprenticeship or training.

Distribute the number of apprentices or trainees among the project work classifications on the basis of the prime contractor’s needs and the availability of journeymen in the various classifications within a reasonable recruitment area.

Before starting project work, the prime contractor shall submit to the Town of Paradise:

1. Number of apprentices or trainees to be trained for each classification 254
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 60

2. Training program to be used

3. Training starting date for each classification
The prime contractor shall obtain the Town’s approval for this submitted information before the prime contractor starts work. The Town of Paradise credits you for each apprentice or trainee the prime contractor employs on the project who is currently enrolled or becomes enrolled in an approved program.

The primary objective of this section is to train and upgrade minorities and women toward journeymen status. The prime contractor shall make every effort to enroll minority and women apprentices or trainees, such as conducting systematic and direct recruitment through public and private sources likely to yield minority and women apprentices or trainees, to the extent they are available within a reasonable recruitment area and show that you have made the efforts. In making these efforts, the prime contractor shall not discriminate against any applicant for training.

The prime contractor shall not employ as an apprentice or trainee an employee:

1. In any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman

2. Who is not registered in a program approved by the US Department of Labor, Bureau of Apprenticeship and Training
The prime contractor shall ask the employee if the employee has successfully completed a training course leading to journeyman status or has been employed as a journeyman. The prime contractor’s records must show the employee's answers to the questions.

In the training program, the prime contractor shall establish the minimum length and training type for each classification. The Town of Paradise and FHWA approves a program if one of the following is met:

1. It is calculated to:
a. Meet the equal employment opportunity responsibilities b. Qualify the average apprentice or trainee for journeyman status in the classification involved by the end of the training period

2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, and it is administered in a way consistent with the equal employment responsibilities of Federalaid highway construction contracts The prime contractor shall obtain the State's approval for their training program before you start project work involving the classification covered by the program.

The prime contractor shall provide training in the construction crafts, not in clerk-typist or secretarialtype positions. Training is allowed in lower level management positions such as office engineers, estimators, and timekeepers if the training is oriented toward construction applications. Training is allowed in the laborer classification if significant and meaningful training is provided and approved by the division office. Off-site training is allowed if the training is an integral part of an approved training program and does not make up a significant part of the overall training.

The Town of Paradise reimburses the prime contractor 80 cents per hour of training given an employee on this contract under an approved training program:

1. For on-site training

2. For off-site training if the apprentice or trainee is currently employed on a Federal-aid project 255
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 61
and prime contractor does do at least one of the following:
a. Contribute to the cost of the training
b. Provide the instruction to the apprentice or trainee c. Pay the apprentice's or trainee's wages during the off-site training period

3. If the prime contractor complies with this section.

Each apprentice or trainee must:

1. Begin training on the project as soon as feasible after the start of project work involving the apprentice's or trainee's skill

2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's project work classification or until the apprentice or trainee has completed the training program
The prime contractor shall furnish the apprentice or trainee with a copy of the program that the prime contractor will comply with in providing the training.

37.D Title VI Assurances
During the performance of this Agreement, the contractor, for itself, its assignees and successors in interest (hereinafter collectively referred to as Contractor) agrees as follows:

1. Compliance with Regulations: CONTRACTOR shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the REGULATIONS), which are herein incorporated by reference and made a part of this agreement.

2. Nondiscrimination: CONTRACTOR, with regard to the project work performed by it during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub-applicants, including procurements of materials and leases of equipment. CONTRACTOR shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the agreement covers a program set forth in Appendix B of the Regulations.

3. Solicitations for Sub-agreements, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by CONTRACTOR for project work to be performed under a Sub-agreement, including procurements of materials or leases of equipment, each potential sub-applicant or supplier shall be notified by CONTRACTOR of the CONTRACTOR’S obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

4. Information and Reports: CONTRACTOR shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the California Department of Transportation or FHWA to be pertinent to ascertain compliance with such Regulations or directives. Where any information required of CONTRACTOR is in the exclusive possession of another who fails or refuses to furnish this information, CONTRACTOR shall so certify to the California Department of Transportation or the FHWA as appropriate, and shall set forth what efforts CONTRACTOR has made to obtain the information. 256
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 62

5. Sanctions for Noncompliance: In the event of CONTRACTOR’s noncompliance with the nondiscrimination provisions of this agreement, the California Department of Transportation shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:
a. withholding of payments to CONTRACTOR under the Agreement within a reasonable period of time, not to exceed 90 days; and/or
b. cancellation, termination or suspension of the Agreement, in whole or in part.

6. Incorporation of Provisions: CONTRACTOR shall include the provisions of paragraphs (1) through (6) in every sub-agreement, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto.

CONTRACTOR shall take such action with respect to any sub-agreement or procurement as the California Department of Transportation or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that, in the event CONTRACTOR becomes involved in, or is threatened with, litigation with a sub-applicant or supplier as a result of such direction, CONTRACTOR may request the California Department of Transportation enter into such litigation to protect the interests of the State, and, in addition, CONTRACTOR may request the United States to enter into such litigation to protect the interests of the United States.

47.D Use of United States Flag Vessels
The contractor agrees –

1. To utilize privately owned United State-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for Unites States-flag commercial vessels.

2. To furnish within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated, ‘on-board’ commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590.

3. To insert the substance of the provisions of this clause in all subcontracts issued pursuant to this contract.

57.D Compliance with Federal Law, Regulations and Executive Order This is an acknowledgement that FEMA financial assistance will be used to fund all or a portion of the contract. Contractor shall at all times comply with all applicable regulations, policies, procedures, and FEMA Directives as they may be amended or promulgated from time to time during the term of this Contract, included but not limited to the requirements of 2 C.F.R. §§ 200.317 through 200.326 and more fully set forth in Appendix II to Part 200 – Contract Provisions for Non-Federal Entity Contracts Under Federal Awards, which is included herein by this reference. Contractor’s failure to so comply shall constitute a material breach of this Contract.
257
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 63
Contractor agrees to include the above clause in each third-party subcontract financed in whole or in part with Federal assistance provided by FEMA. It is further agreed that the clause shall not be modified, except to identify the subcontractor who will be subject to its provisions

67.D No Obligation by Federal Government
The Federal Government is not a party to this contract and is not subject to any obligations or liabilities to the non-Federal entity, contractor, or any other party pertaining to any matter resulting from the contract.

77.D DHS Seal, Logo, and Flags
The contractor shall not use the DHS seal(s), logos, crests, or reproductions of flags or likenesses of DHS agency officials without specific FEMA pre-approval.

Section 8 Prosecution and Progress

8.A General
Refer to Section 8 “Prosecution and Progress” of the Standard Specifications.

8.B Schedule
Contractor shall adhere to “Level 1 Critical Path Method Schedule” provisions in Section 8-1.02B of the Standard Specifications.

Or
The appropriate Critical Path Method based on working days and base bid of the project shall be used per section 8-1.02 “Schedule” of the Standard Specifications.

8.C Pre-Construction Conference
Attend a preconstruction conference with key personnel, including your assigned representative, at a time and location determined by the Engineer. Submit documents as required before the preconstruction conference. You may start work before the preconstruction conference.

Be prepared to discuss the topics and documents shown in the following table:

TOPICS DOCUMENT OR DESCRIPTION
Potential claim and dispute
resolution Potential claim forms
Contractor's representation Assignment of Contractor's representative DBE Final utilization reports and other requirements
Equipment Equipment list
Labor compliance and equal
employment opportunity Job site posters and benefit and payroll reports Material inspection Notice of Materials to be Used
Materials on hand Request for Payment for Materials on Hand Measurements --
258
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 64
Landscape Materials Material changes
Quality control QC plans and protocol
Safety Injury and Illness Prevention Program and job site posters
Schedule
Baseline critical path schedule, 3-week
lookaheads and Weekly Statement of Working
Days
Subcontracting Subcontracting Request
Surveying --
Traffic control Traffic contingency plan and traffic control plans Auxiliary Changeable Message
Boards Purpose, Message, Timing, Placement, Duration,
Utility work
Locating, potholing, timing of work, adjusting.

Town of Paradise utilities (storm drain, traffic
signal, lighting electrical) are not a part of USA.

Project Limits/ Adjacent Properties --
Water pollution control SWPPP or WPCP
Weight limitations
Work restrictions PLACs (Permits, License, Approvals, and Certificates)
Jobsite Photographs --
24 Hour Emergency Contact
Information Contact information
Record drawings --
Action submittals --

8.D Start of Job Site Activities
Section 8-1.04B does not apply.

Contract time will start after the issuance of the Notice to Proceed and this first working day will be THE EARLIER OF the start of job site activities, OR 15 calendar days after the issuance of a Notice to Proceed, OR on the date mutually agreed upon between the Contractor and the Engineer.

Contractor is encouraged to start the pre-construction submittal and approval process after the issuance of the Notice of Award.

Do not start job site activities until the Department authorizes or accepts your submittal for:

1. Contractor-supplied biologist, if applicable.

2. Biological resource information program, if applicable. 259
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 65

3. CPM baseline schedule

4. WPCP or SWPPP, whichever applies

5. Notification DRA or DRB nominee and disclosure statement, if applicable

6. Natural resource protection plan, If applicable
If the submittals for Contractor-supplied biologist and biological resource information program are authorized, you may enter the job site only to measure controlling field dimensions and locating utilities.

You may enter the job site only to measure controlling field dimensions and locating utilities.

Do not start other job site activities until all the submittals from the above list are authorized or accepted and the following information is received by the Engineer:

7. Notice of Materials To Be Used.

8. Contingency plan for reopening closures to public traffic.

9. Written statement from the vendor that the order for the sign panels has been received and accepted by the vendor. The statement must show the dates that the materials will be shipped.

10. Written statement from the vendor that the order for electrical material has been received and accepted by the vendor. The statement must show the dates that the materials will be shipped.

11. Written statement from the vendor that the order for structural steel has been received and accepted by the vendor. The statement must show the dates that the materials will be shipped.

12. Submit a notice 72 hours before starting job site activities. If the project has more than 1 location of work, submit a separate notice for each location.

If the Contract is not approved, leave the job site in a neat condition. If a facility has been changed, restore it to its former condition or an equivalent condition. The Department does not pay for the restoration.

8.E Time
This work shall be diligently prosecuted to completion before the expiration of 50 working days after the date provided in Section 8.D, “Start of Job Site Activities”.

8.F Delays
Attention is directed to Section 8-1.07, “Delays” of the Standard Specifications.

Add to the end of section 8-1.07C:

The Department does not make a payment adjustment for overhead incurred during non–working days that extend the Contract into an additional construction season.

Replace the 1st paragraph of section 8-1.07C with:

For an excusable delay that affects your costs, the Department may make a payment adjustment.

18.D Wildland Fire Area
The Contractor is advised that the Town of Paradise is in a Wildland Fire Area and during the summer months the fire hazard is EXTREME. Fire safe conduct by the contractor and Contractor’s employees is to be observed at all times. Fire extinguishers or other approved fire suppressants are to be available at all times while contract operations are underway. 260
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 66
Contractor shall not perform any work during any period of time declared as a Red Flag Warning by the National Weather Service encompassing the project area. Further, at any time time during the progress of this contract it may be necessary to shut down operations due to Emergency Operations by the Town in response to a wildland fire. If a shutdown should occur during the Contractor’s normal operations, contractor may request delay-related time or payment adjustment by per Section 8-1.07, of the Standard Specifications and as amended in these Special Provisions.

8.G Liquidated Damages
The provisions of Section 8-1.10A, “General” of the Standard Specifications shall be changed to read as follows:

Liquidated damages, if any, accrue starting on the 1st day after the expiration of the working days through the day of Contract acceptance except as specified in sections 8-1.10B and 8-1.10C. The Department withholds liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work.

Liquidated damages for all work are as shown in the following table:

Liquidated Damages
Total bid Liquidated damages per
From over To day
$0 $60,000 $1,400
$60,000 $200,000 $2,900
$200,000 $500,000 $3,200
$500,000 $1,000,000 $3,500
$1,000,000 $2,000,000 $4,000
$2,000,000 $5,000,000 $4,800
$5,000,000 $10,000,000 $6,800
$10,000,000 $20,000,000 $10,000
$20,000,000 $50,000,000 $13,500
$50,000,000 $100,000,000 $19,200
$100,000,000 $250,000,000 $25,300
Section 9 Payment

9.A General
Refer to Section 9, “Payment” of the Standard Specifications.

9.B Payment Scope
Attention is directed to the provisions in Section 9-1.03 “Payment Scope” of the Standard Specifications, and the following amendments:

Add to the list in the 1st paragraph of section 9-1.03:

3. Any royalties and costs arising from patents, trademarks, and copyrights involved in the work Replace item 1 in the 3rd paragraph of section 9-1.03 which describes payments with:
261
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 67

1. Full compensation for all work involved in each bid item shown on the Bid Item List by the unit of measure shown for that bid item
Replace "10" in the last paragraph of section 9-1.03 with:
7 9.C Force Account
Attention is directed to the provisions in Section 9-1.04A “Force Account” of the Standard Specifications, and the following amendments:

Replace table in the last paragraph of section 9-1.04A with:

For non-subcontracted work paid by force account for a contract with a TRO bid item, the markups are those shown in the following table instead of those specified in sections 9-1.04B–D:

COST PERCENT MARKUP

1. Labor 15

2. Materials 10

3. Equipment rental 10
Replace item 2 in the 3rd paragraph of section 9-1.04D(3) with:

2. Operated less than 4 hours is paid as 1/2 day

9.D Payment Adjustments for Price Index Fluctuations
As described in Section 2-1.31 “Opt Out Of Payment Adjustments For Price Index Fluctuations” of the Standard Specifications and these Special Provisions, you may opt out of the payment adjustments for price index fluctuations specified in Section 9-1.07.

Attention is directed to the provisions in Section 9-1.07 of the Standard Specifications and these Special Provisions.

An Opt-Out form is in the Bid Documents.

9.E Progress Payments
In addition to the provisions in Section 9-1.16A “General” in the Standard Specifications, “Retention” is additionally reflected in progress payments.

19.D Prompt Payment from the Agency to the Contractor
The Agency shall make any progress payment within 30 days after receipt of an undisputed and properly submitted payment request from a contractor on a construction contract. If the Agency fails to pay promptly, the Agency shall pay interest to the contractor, which accrues at the rate of 10 percent per annum on the principal amount of a money judgment remaining unsatisfied. Upon receipt of a payment request, the Agency shall act in accordance with both of the following:

1. Each payment request shall be reviewed by the Agency as soon as practicable after receipt for the purpose of determining that it is a proper payment request.

2. Any payment request determined not to be a proper payment request suitable for payment shall be returned to the contractor as soon as practicable, but not later than seven (7) days, after receipt. A request returned pursuant to this paragraph shall be accompanied by a document setting forth in writing the reasons why the payment request is not proper. 262
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 68

29.D Mobilization
Attention is directed to Section 9-1.16D “Mobilization” of the Standard Specifications and is amended to include the provisions in this Section.

The Department makes partial payments for Mobilization costs which shall adhere to Public Contract Code § 10264 as follows and not to exceed the following:
• When 5 percent of the original contract amount is earned, 50 percent of the amount bid for mobilization, or 5 percent of the original contract amount, whichever is lesser, may be paid. • When 10 percent of the original contract amount is earned, 75 percent of the amount bid for mobilization or 7.5 percent of the original contract amount, whichever is lesser, may be paid. • When 20 percent of the original contract amount is earned, 95 percent of the amount bid for mobilization, or 9.5 percent of the original contract amount, whichever is lesser, may be paid. • When 50 percent of the original contract amount is earned, 100 percent of the amount bid for mobilization, or 10 percent of the original contract amount, whichever is lesser, may be paid.

Upon completion of all work on the project, payment of any amount bid for mobilization in excess of 10 percent of the original contract amount will be paid.

The adjustment provisions in Section 4-1.05 “Changes and Extra Work” of the Standard Specifications and the retention of payment provisions in Section 9.E-1 “Retention” shall not apply to the contract lump sum item of mobilization.

When other contract bid item(s) are adjusted as provided in Section 4-1.05 “Changes and Extra Work” of the Standard Specifications, if the costs applicable to an item of work include mobilization costs, those mobilization costs will be deemed to have been recovered by the Contractor by the payments made for mobilization, and will be excluded from consideration in determining compensation under said Section 4-1.05.

39.D Retention
Section 9-1.16F “Retentions” of the Standard Specifications is replaced with the following:

Pursuant to Public Contract Code § 7201, the Town shall retain five percent (5%) of Progress Payments as part security for the fulfillment of the contract by the Contractor, and shall monthly pay to the Contractor, while carrying on the work, the balance not retained as aforesaid, after deducting therefrom all previous payments and all sums to be kept or retained under the provision of the contract. No such estimate or payment shall be required to be made when, in the judgment of the Engineer, the work is not proceeding in accordance with the provisions of the contract.

For federally funded projects, release of retention shall adhere to Section 9.F, “Prompt Payment of Funds Withheld to Subcontractors” of these Special Provisions.

9.F Prompt Payment of Funds Withheld to Subcontractors
The agency shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the agency, of the contract work, and pay retainage to the prime contractor based on these acceptances. The prime contractor, or subcontractor, shall return all monies withheld in retention from a subcontractor within 30 days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the agency. Federal law (49CFR26.29) requires that any delay or postponement of payment over 30 days may take place only for good cause and with the agency’s prior written 263
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 69
approval. Any violation of this provision shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified in Section 7108.5 of the Business and Professions Code. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor.

9.G Prompt Progress Payment to Subcontractors
A prime contractor or subcontractor shall pay any subcontractor not later than 10 days of receipt of each progress payment in accordance with the provision in Section 7108.5 of the California Business and Professions Code concerning prompt payment to subcontractors. The 10 days is applicable unless a longer period is agreed to in writing. Any delay or postponement of payment over 30 days may take place only for good cause and with the agency’s prior written approval. Any violation of Section 7108.5 shall subject the violating contractor or subcontractor to the penalties, sanction and other remedies of that section. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor.

9.H DBE Running Tally of Attainments
After submitting an invoice for reimbursement that includes a payment to a DBE, but no later than the 10th of the following month, the prime contractor/consultant shall complete and email the Exhibit 9- F: Disadvantaged Business Enterprise Running Tally of Payments to [email protected] with a copy to the Agency.

9.I Final Payment and Claims
Attention is directed to Section 9-1.17 “Payment After Contract Acceptance” of the Standard Specifications. Section 9.1.17D “Final Payment and Claims” of the Standard Specifications is amended to include the following provisions:

The final payment will not be due and payable until the expiration of thirty-five (35) days from the date of recordation of the notice of acceptance of completion in the Office of the County Recorder of Butte County.

It is mutually agreed between the parties to the contract that no payments made under the contract shall be conclusive evidence of the performance of the contract, either wholly or in part, against any claim of the Town, and no payment shall be construed to be acceptance of any defective project work or improper material.

19.D Claim Statement
Section 9-1.17D(2)(a), “General” of the Standard Specifications is amended to include the following provisions:

Pursuant to Public Contract Code § 9204, upon receipt of a claim the Department shall conduct a reasonable review of the claim and, within 45 days, provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. The claimant shall furnish reasonable documentation to support the claim. Payment on an undisputed portion of the claim shall be made within 60 days after the Department issues its written statement. If the public entity fails to issue a written statement, the claim is deemed rejected.

If the claimant disputes the Department’s response, or if the Department fails to respond to a claim, the claimant may demand in writing by registered or certified mail return receipt 264
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 70
requested an informal conference to meet and confer. The Department shall then schedule a meet and confer conference within 30 days.

Within 10 business days following the meet and confer conference, the Department shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Payment on the undisputed portion of the claim shall be made within 60 days. Any disputed portion of the claim shall be submitted to nonbinding mediation. If mediation is unsuccessful, the parts of the claim remaining in dispute may be arbitrated or litigated.

Failure by the Department to follow these procedures shall be deemed a rejection of the claim.

A claim that is denied by reason of the Department’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.

29.D Program Fraud and False or fraudulent Statements or Related Acts The Contractor acknowledges that 31 U.S.C. Chap. 38 (Administrative Remedies for False Claims and Statements) applies to the Contractor’s actions pertaining to this contract.

9.J Quantities of Aggregate and Other Roadway Materials Attention is directed to Section 9-1.02D “Quantities of Aggregate and Other Roadway Materials” of the Standard Specifications. This section will not be used unless the Engineer deems necessary to determine water weight of material.

9.K Arbitration
Section 9-1.22 “Arbitration” of the Standard Specifications is deleted in its entirety. All unresolved claims shall be resolved in a court of competent jurisdiction located in the County of Butte. Any reference in the Standard Specifications to arbitration shall be deemed to refer to such litigation in a court of competent jurisdiction
Section 10 General

10.A Order of Work
In general, the following items of work shall commence in this order:

1. Preconstruction Conference

2. Submit Project Schedule

3. Coordinate with Utilities

4. Submit Temporary Traffic Control Plan

5. Submit IIPP

6. Submit WPCP/SWPPP

7. Material Submittals

8. Complete and/or submit PLAC’s prior to starting work

9. Agency and Public Advanced Notice

10. USA utility locates

11. Mobilization

12. Traffic Control System

13. Perform Utility Potholing

14. Place temporary BMP’s

15. Construction Survey/ Layout
265
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 71

16. Reference Tie Existing Utilities for Adjustment

17. Demo and remove existing facilities

18. Place Pipe and required fittings

19. Install new Fire Hydrants

20. Backfill per trench detail

21. Surface Restoration

10.B Work Sequencing
Coordinate work activities such that will garbage pick-up will not disrupt access to garbage bins. Do not place seals or paving during days of garbage pick-up. Refer to Section 10.C “Advanced Notification”.

Before obliterating any traffic stripes, pavement markings, and pavement markers to be replaced at the same location, reference the stripes, markings, and markers. Include limits and transitions with control points to reestablish the new stripes, markings, and markers.

Construction of the new structural section adjacent to the existing traveled way must be performed in successive operations until completed. Excavation within 8 feet of the existing traveled way must not precede the paving operation by more than 2 working days unless:

1. Authorized

2. Material is placed and compacted against the vertical cuts within 0.15 feet of the existing traveled way. During excavation operations, native material may be used for this purpose except once the placing of the structural section starts, structural material must be used. Place the material up to the top of the existing pavement and taper at a slope of 4:1 (horizontal:vertical) or flatter to the bottom of the excavation. Do not use treated base for the taper.

At the end of each working day if a difference in excess of 0.17’ feet exists between the elevation of the existing pavement and the elevation of an excavation within 8 feet of the traveled way, place and compact material against the vertical cut adjacent to the traveled way. During the excavation operation, you may use native material for this purpose except once the placing of the structural section starts, structural material must be used. Place the material up to the top of the existing pavement and taper at a slope of 4:1 (horizontal: vertical) or flatter to the bottom of the excavation. Do not use treated base for the taper.

Before any paving operation that may cover existing utility or monument, reference and record the location of all utility covers and monument.

10.C Advanced Notification
110.D Advance Notification of Agencies
Contractor shall have available at all times during Contractor’s working hours, a public relations person to deal with public and business concerns and shall report to the Engineering Division, Department of Public Works.

The Contractor shall notify all agencies which may be affected by the construction.

Notification shall be in writing and at least 72 hours prior to construction. The notice shall include the project limits, starting date, scheduled date of completion, Contractor contact person and Contractor telephone number. The agencies shall include, but not be limited to:

AGENCY FAX NO:
266
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 72

1. Northern Recycling (530) 877-3825

2. Cal Fire (530) 877-5957

3. Paradise Irrigation District (530) 876-0438

4. U. S. Postal Service (530) 872-9045

5. Paradise Unified School District (Transportation) (530) 872-6464

6. First Responder (530) 891-5854

7. Butte County Transit (BCAG B-Line) (530) 879-2468

8. The Paradise Post (530) 877-1326

9. Paradise Express (530) 342-8871

10. Town of Paradise Police Department (530) 872-4950
The Contractor shall keep current and notify the local Police and Fire Departments of Contractor’s construction operation and traffic control changes three (3) days before project work is to begin or traffic changes are made. The Contractor shall cooperate with local authorities relative to handling traffic through the area and shall make Contractor’s own arrangements in keeping the project work area clear of parked vehicles Failure to comply with the provisions for notification shall result in the suspension of all project work until the provisions have been met.
210.D Advanced Notification to Residents
The Contractor shall notify all residents, businesses, and tenants that may be affected by or are in the immediate vicinity of the construction at least 72 hours prior to construction. Where a residential driveway is shown to be constructed, you must notify that resident two (2) weeks before the driveway reconstruction. Notification shall be in writing and include a brief description of the project work, starting date, planned date of completion, Contractor contact person and Contractor phone number. Notice shall be hand carried by Contractor Representative. Should a change in the project work schedule occur after the residents and/or businesses have been notified the Contractor shall notify the residents and/or businesses of the change in schedule within 24 hours of the originally scheduled starting date.

Contractor shall have at the job site, at all times during Contractor's working hours, a full time public relations person to deal with public and business concerns and shall report to the Town Engineer.

When the construction requires prohibiting parking, "No Parking" signs shall be posted along the construction routes. The signs shall include the dates and times that no parking periods will be in effect. "No Parking" signs shall be mounted on Class I barricades and placed in the gutter pan not more than 500 feet apart. Signs shall be posted a minimum of 24 hours in advance of construction and immediately removed upon completion. Should the Contractor not commence project work after 24 hours from placement of the signs, the signs shall be removed. If a vehicle is parked in a properly posted no parking area and is prohibiting the progression of project work, the Contractor shall notify the Paradise Police Department to arrange for removal of the vehicle.

Failure to comply with the provisions for notification shall result in the suspension of all project work until the provisions have been met.

10.D Develop Water Supply
Attention is directed to Section 10-6 “Watering” of the Standard Specifications and Section 5.D of these Special Provisions.
267
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 73
Section 11 Welding
Refer to Section 11, “Welding” of the Standard Specifications.

Section 12 Temporary Traffic Control
Refer to Section 12, “Temporary Traffic Control” of the Standard Specifications.

12.A General
Section 12-1.01 “General” of the Standard Specifications is amended to include the following:

12.B Traffic Control System
Attention is directed to Section 12-4, “Maintaining Traffic” of the Standard Specifications and are amended to include the following:
112.D General
Section 12-4.01 “General” is amended to include the following provisions:

Emergency vehicles shall be permitted to pass through project work area without delay at all times.

During any period of time declared as a Red Flag Warning by the National Weather Service encompassing the project area, Contractor shall remove all temporary traffic controls affecting lane closures or ingress/egress within the project area. In events where the course of construction prohibits the contractor from removing the traffic control, Contractor shall undertake immediate interim efforts to safely open the roadway, as approved by Engineer.
212.D Temporary Traffic Control Plan
Prepare and submit to the Engineer a Temporary Traffic Control Plan for approval. The Temporary Traffic Control Plan must adhere to the California Manual on Uniform Traffic Control Devices. Refer to Section 5-1.23B of the Standard Specifications and as amended in these special provisions for submittal requirements.

Where subgrade and paving activities are underway, provide 1 lane of traffic in each direction on arterial and collector roads, where feasible, and 1 lane with reversing traffic control on residential roads. During standard construction hours, temporary road closures with detours between certain blocks are allowable with prior approval from the Town Engineer, as long as emergency ingress and egress is maintained at all times. The Temporary Traffic Control Plan shall include a contingency plan to reopen temporary closures at the end of the working day in the event of equipment failure or delays.

The Contractor or Contractor’s representative and all subcontractors shall have a copy of the approved Temporary Traffic Control Plan pertinent to the project work in progress at all times. Failure to adhere to the Traffic Control Plan shall be grounds for the Town of Paradise to require the Contractor to stop the project work until traffic control is in compliance with the approved Temporary Traffic Control Plan Add to Section 12-1.04 “Payment” with:

Traffic Control System, as described by the Standard Specifications and Section 12 of these Special Provisions, except Portable Changeable Message Signs, will be paid by lump sum and no additional compensation will be made thereof.
268
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 74

12.C Flagging Costs
Section 12-1.04 “PAYMENT” of the Standard Specifications is hereby deleted. All flagging costs will be borne by the contractor (100%) and included in Temporary Traffic Control and no division of costs will be made therefor.

12.D Portable Changeable Message Signs
Attention is directed to Section 12-3.32, “Portable Changeable Message Signs” of the Standard Specifications.

Add to section 12-3.32A(1) “Summary”:

Provide portable changeable message signs (PCMS) as shown that will provide the public a minimum of seven (7) days advance notification of the proposed road project work at all times. PCMS’ shall remain in place the duration of work, unless otherwise approved by the Engineer.

The sign placement and message shall be approved by the Engineer and be included in the Temporary Traffic Control Plan. Message will be current to describe work activities and traffic control activities. 112.D Payment
Replace Section 12-3.32D “Payment” with:

Payment for Portable Changeable Message Signs shall be paid per each as indicated in the Bid Item List.

Unit price for each includes the installation for the duration of the work. Separate payment will not be made for moving the same PCMS from location to location.

12.E Barricades
Attention is directed to Section 12-3.10, “Barricades” of the Standard Specifications. 112.D Payment
Replace Section 12-3.10D “Payment” with:

Payment for Barricades shall be included in the cost of Traffic Control System and no additional payment will be allowed therefor.

12.F Construction Area Signs
Attention is directed to Section 12-3.11, “Construction Area Signs” of the Standard Specifications. 112.D Payment
Replace Section 12-3.11D “Payment” with:

Payment for Construction Area Signs shall be included in the cost of Traffic Control System and no additional payment will be allowed therefor.

12.G Pedestrian Facilities
Attention is directed to Section 12-4.04 “Pedestrian Facilities” of the Standard Specifications 112.D Payment
Replace Section 12-3.11D “Payment” with:

Payment for Pedestrian Facilities shall be included in the cost of Traffic Control System and no additional payment will be allowed therefor.

12.H Temporary Pavement Delineation
Attention is directed to Section 12-6 “Temporary Pavement Delineation” of the Standard Specifications 269
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 75
112.D Payment
Replace Section 12-6.04 “Payment” with:

Payment for Temporary Pavement Delineation shall be included in the cost of Traffic Control System and no additional payment will be allowed therefor.

Section 13 Water Pollution Control
Refer to Section 13, “Water Pollution Control” of the Standard Specifications.

Discharges of storm water from the project must comply with most current NPDES General Permit for "Stormwater Discharges Associated with Construction and Land Disturbance Activities" (Order No 2022-0057- DWQ, NPDES No. CAS000002).

Add to section 13-3.01A:

Contractor to determine the project risk level.

13.A Definitions and Abbreviations
Active and inactive areas: (1) Active areas have soil disturbing work activities occurring at least once within 14 days, and (2) Inactive areas are areas that have not been disturbed for at least 15 days.

BMPs: Best Management Practices are water pollution control practices. construction phase: Construction phases are (1) Highway Construction including work activities for building roads and structures, (2) Plant Establishment including maintenance on vegetation installed for final stabilization, and (3) Suspension where work activities are suspended and areas are inactive.

CSMP: Construction Site Monitoring Program.

NAL: Numeric Action Level
NEL: Numeric Effluent Limit
NPDES: National Pollutant Discharge Elimination System
NOI: Notice of Intent
normal working hours: The hours you normally work on this project Preparation Manual: The Department's "Storm Water Pollution Prevention Plan and Water Pollution Control Program Preparation Manual."
QSD: Qualified SWPPP Developer
QSP: Qualified SWPPP Practitioner
REAP: Rain Event Action Plan.

RWQCB: Regional Water Quality Control Board.

SAP: Sampling and Analysis Plan
SSC: Suspended Sediment Concentration
SWRCB: State Water Resources Control Board
SWPPP: Storm Water Pollution Prevention Plan
WDID: Waste Discharge Identification Number
WPC: Water Pollution Control
270
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 76
WPC Manager: Water Pollution Control Manager. The WPC Manager implements water pollution control work described in the SWPPP and oversees revisions and amendments to the SWPPP.

13.B Prepare Stormwater Pollution Prevention Plan
Attention is directed to Section 13-3, “Stormwater Pollution Prevention Plan” of the Standard Specifications. 113.D Payment
Add to Section 13-3.04 “Payment” with:

Payment for Prepare Stormwater Pollution Prevention Plan shall include the cost of permit fees, preparing the plan, installing, maintaining, replacing and removing all temporary soil stabilization, sediment control,sediment tracking and linear sediment barriers, including erosion control blankets, mulch, check dams, drainage inlet protection, fiber rolls, gravel bag berms, silt fences, construction entrances, and concrete washouts and monitoring including rain event action plan, storm water sampling, analysis and reports and storm water annual report, and no additional payment will be allowed therefor.

All costs to maintain temporary sediment and erosion control measures will be totally (100%) borne by the contractor and no division of costs will be made therefor.

13.C Temporary Soil Stabilization
Refer to Section 13-5, “Temporary Soil Stabilization” of the Standard Specifications. 113.D Temporary Erosion Control Blanket
Attention is directed to Section 13-5.02B “Erosion Control Blankets” of the Standard Specifications. 213.D Temporary Mulch
Attention is directed to Section 13-5 .02C “Temporary Mulch” of the Standard Specifications. 313.D Payment
Replace Section 13-5.04 “Payment” with:

Payment for Temporary Soil Stabilization is included in the cost for Prepare Stormwater Pollution Prevention Plan, and no additional payment will be allowed therefor.

13.D Temporary Sediment Control
Refer to Section 13-6, “Temporary Sediment Control” of the Standard Specifications. 113.D Temporary Check Dam
Attention is directed to Section 13-6.03B “Temporary Check Dams” of the Standard Specifications. 213.D Temporary Drainage Inlet Control
Attention is directed to Section 13-6.03C “Temporary Drainage Inlet Protection” of the Standard Specifications. 313.D Temporary Fiber Roll
Attention is directed to Section 13-6.03E “Temporary Fiber Rolls” of the Standard Specifications. 413.D Temporary Gravel Bag Berm
Attention is directed to Section 13-6.03F “Temporary Gravel Bag Berms” of the Standard Specifications. 513.D Payment
Replace Section 13-6.04 “Payment” with:

Payment for Temporary Sediment Control is included in the cost for Prepare Stormwater Pollution Prevention Plan, and no additional payment will be allowed therefor. 271
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 77

13.E Temporary Tracking Control
Refer to Section 13-7, “Temporary Tracking Control” of the Standard Specifications. 113.D Temporary Construction Entrance
Attention is directed to Section 13-7.03 “Temporary Construction Road and Entrance” of the Standard Specifications.
213.D Payment
Replace Section 13-7.03D “Payment” with:

Payment for Temporary Construction Entrance is included in the cost for Prepare Stormwater Pollution Prevention Plan , and no additional payment will be allowed therefor.

13.F Temporary Concrete Washouts
Refer to Section 13-9, “Temporary Concrete Washouts” of the Standard Specifications. 113.D Payment
Replace Section 13-9.04 “Payment” with:

Payment for Temporary Concrete Washouts is included in the cost for Prepare Stormwater Pollution Prevention Plan, and no additional payment will be allowed therefor.

13.G Temporary Linear Sediment Barriers
Refer to Section 13-10, “Temporary Linear Sediment Barriers” of the Standard Specifications. 113.D Temporary Silt Fence
Attention is directed to Section 13-10.3F “Temporary Silt Fence” of the Standard Specifications.

Add Section 13-10.03F(1) “Payment”:

Payment for Temporary Silt Fence is included in the cost for Prepare Stormwater Pollution Prevention Plan , and no additional payment will be allowed therefor.

Refer to Section 13-10, “Temporary Linear Sediment Barriers” of the Standard Specifications.

13.H Rain Event Action Plan
Attention is directed to Section 13-3.01C(3), “Rain Event Action Plan” of the Standard Specifications. 113.D Payment
Replace the last 2 paragraphs of Section 13-3.04 “Payment” with:

Payment for Rain Event Action Plan is included in the cost for Prepare Stormwater Pollution Prevention Plan and no additional payment will be allowed therefor.

13.I Stormwater Sampling, Analysis and Reports
Attention is directed to Section 13-3.01C(2)(b)(v), “Sampling and Analysis Plan”, Section 13-3.01C(2)(b)(v), “Sampling and Analysis Plan for Nonvisible Pollutants”, Section 13-3.01C(2)(b)(vi), “Sampling and Analysis Reports” of the Standard Specifications.

Add to Section 13-3.04 “Payment”:

Payment for Stormwater Sampling, Analysis and Reportsis included in the cost for Prepare Stormwater Pollution Prevention Plan, and no additional payment will be allowed therefor. 272
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 78

13.J Stormwater Annual Report
Attention is directed to Section 13-3.01C(4), “Stormwater Annual Report” of the Standard Specifications.

Add to Section 13-3.04 “Payment”:

Payment for Stormwater Annual Report is included in the cost for Prepare Stormwater Pollution Prevention Plan , and no additional payment will be allowed therefor.

13.K Job Site Management
Contractor must maintain a clean job site and comply with the provision of Section 13-4 of the Standard Specifications as needed.

13.L Street Sweeping
Attention is directed to Section 13-7.02, “Street Sweeping” of the Standard Specifications.

Section 14 Environmental Stewardship
Refer to Section 14, “Environmental Stewardship” of the Standard Specifications.

The Contractor shall make themselves aware all environmental requirements contained within the Bid Book documents and, on the plans, and adhere to those requirements. Unless otherwise specified in these Special Provisions, on Contract Plans or included in the bid list, all work considered under this section will be paid for under other various items of work and no additional compensation will be allowed.

Prior to the commencement of any work in the vicinity of any tree, each tree shall be visually surveyed, from all sides, for the sole purpose of detecting the presence of bird nests or wildlife of any type. If a nest is found and is determined to be active, there shall be no work of any type in the tree in which the nest is found without the written permission of the Town. At no time shall any nest or wildlife be removed from its location. In the event that wildlife is accidentally displaced, the Contractor shall notify the Engineer for assistance.

14.A Cultural Resources
Attention is directed to Section 14-2 “Cultural Resources” of the Standard Specifications.

14.B Noise Control
Replace Section 14-8.02 “Noise Control” of the Standard Specifications with the following:

Section 14-8.02 includes specifications relating to noise control.

Do not exceed 86 dBA LMax at 50 feet from the job site activities from 7 p.m. to 6 a.m. You must comply with local ordinances regulating noise level. The noise level requirement must apply to the equipment on the job or related to the job, including, but not limited to, trucks, transit mixers, or transient equipment that you may or may not own.

Equip an internal combustion engine with the manufacturer-recommended muffler. Do not operate an internal combustion engine on the job site without the appropriate muffler.

14.C Dust Control
In addition to the provisions in Section 14-11.04 “Dust Control” of the Standard Specifications, the Contractor must comply with the requirements of the Butte County Air Pollution Control District. If required, compliance may include submitting Dust Control Plan(s) and/or obtaining necessary permits. 273
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 79
114.D Payment
A fee may be required to obtain a fugitive dust permit. Full compensation for conforming to the provisions in the Section and the requirements of the permit, including the cost of the permit, shall be considered as included in the contract prices paid for the various items of work and no additional compensation will be allowed therefor.

14.D Species Protection
Replace the 2nd paragraph in Section 14-6.03B “Bird Protection” of the Standard Specifications with the following:

The Department anticipates nesting or attempted nesting by migratory and nongame birds from February 1 to August 31.

Section 15 Existing Facilities
Attention is directed to Section 15 “Existing Facilities” of the Standard Specifications.

15.A Remove Concrete
Replace “3 feet” in the first paragraph in Section 15-1.03B “Removing Concrete” of the Standard Specifications with the following:
12-inches
Replace “1-inch deep” in third paragraph of Section 15-1.03B “Removing Concrete” with the following:
3-inches deep
Add at the end of paragraph 3:

15.B Sawcut at nearest joint of sidewalk or driveway to be removed. Salvaging Facilities Add to the end of section 15-1.03C:

At least 2 business days before hauling the material to the salvaged material stockpile location, notify the Engineer.

15.C Adjust Existing Water Valve, Water Meter, Manhole Cover, Fire Hydrant, Utility Box to Grade Add Section 15-1.03D “Adjust Existing Utilities to Grade”:

Contractor must coordinate with utility companies during construction and prior to the adjustment of any pull boxes, water meter boxes, covers or lids, large pull boxes, manhole covers or utility vaults.

The utility contact information is as follow:

Utility Contact Phone Number
Town of Paradise Kevin Serrao (530) 872-6291 x123
Town of Paradise Traffic Signal Bear Electrical Solutions (408) 449-5178 Pacific Gas and Electric (PG&E) Adam Egbert (916) 591-6130 Paradise Irrigation District (PID) Blaine Allen (530) 876-2062 AT&T Court Schreiber (530) 891 -2392
Comcast Cable Brandon Stokes (530) 206-6172
274
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 80
It is the contractor’s responsibility to adjust all existing Town facilities (storm drain manhole covers, manholes, and inlets), PID, AT&T and Comcast Cable as shown on the plans.

PG&E will be relocating their own facilities with coordinating with the contractor. It is the contractor’s responsibility to contact PG&E and coordinate construction schedule and utility relocation tasks and sequencing during and prior to construction.

15.D Pothole Underground Utilities
Full compensation for Pothole Underground Utilities shall be included in the costs of various items of work and will be considered as included in the contract price paid for the various items of work and no additional compensation will be allowed therefor and shall include all labor, materials, tools, equipment and incidentals in doing all work involved in Pothole Underground Utilities as specified in these Special Provisions, the Standard Specifications, and as directed by the Engineer and no additional compensation will be allowed therefor.

15.E Handling and Removal of Existing Pipe
CONTRACTOR shall be responsible for disposal of all demolished materials; this includes demolition of asbestos cement pipe. Demolished materials shall be disposed of in accordance with applicable federal, state, and local regulations. CONTRACTOR is responsible for determining these regulations and shall bear cost associated with disposal of the materials. Pothole Underground Utilities Section 17 Clearing and Grubbing
Refer to Section 17-2, “Clearing and Grubbing” of the Standard Specifications and the following provisions.

Clear and grub before performing work covered in Section 15.

Replace the 1st Paragraph of section 17-2.03B, “Clearing” with:

Clear all construction areas above original ground of (1) tree and shrubs as shown on plans; (2) all, dead trees, logs, upturned stumps, roots of downed trees, brush, grass, and weeds and (3) other objectionable material including concrete, masonry, and debris to the right-of-way lines or 5’ beyond the construction area, whichever is less.

Section 19 Earthwork
Attention is directed to Section 19 “Earthwork” of the Standard Specifications.

19.A Roadway Excavation
Attention is directed to Section 19-2 “Roadway Excavation” of the Standard Specifications.

Add item 5 to the list in the third paragraph of the section 19-2.01A:

5. Excavating, replacing and compacting soil in the dig-out areas and to the depth as designated on the plans.

19.B Compaction
Attention is directed to Section 19-5 “Compaction” of the Standard Specifications.

19.C Shoulder Backing
Attention is directed to Section 19-9 “Shoulder Backing” of the Standard Specifications.

Add to section 19-9.02 "Materials":
275
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 81
The unit weight of shoulder backing used is 145 lb/cu ft per Caltrans Pavement Tech Notes Shoulder Backing September 30, 2006.

Add to section 19-9.03 "Construction":

Shoulder backing includes material placed to conform to existing gravel or native dirt driveway locations from edge of payment. Preparation of the existing grade, including but not limited to grading and compacting of existing material will be included in the price paid for Shoulder Backing and no additional compensation will be allowed therefor.

19.D Embankment
Attention is directed to Section 19-6 “Embankment Construction” of the Standard Specifications.

Section 26 Aggregate Bases
Refer to Section 26 “Aggregate Bases” of the Standard Specifications.

Delete “either 1-1/2 inch or” from the second paragraph in Section 26-1.02A “General.”

26.A Class 2 Aggregate Base
Attention is directed to Section 26-1.02B “Class 2 Aggregate Base” of the Standard Specifications.

Section 36 Surfacing and Pavements
Attention is directed to Section 36-3 “Pavement Smoothness” of the Standard Specifications.

Replace Section 36-3.01D(3)(b)(i) with:

Test pavement smoothness using a 12-foot straightedge.

Section 39 Asphalt Concrete
Refer to Section 39 “Asphalt Concrete” of the Standard Specifications.

39.A Hot Mix Asphalt (Type A)
Attention is directed to Section 39-2.02 “Type A Hot Mix Asphalt” of the Standard Specifications.

Asphalt Concrete shall be Type-A HMA, 1/2” aggregate gradation, PG 64-10 asphalt binder. Tack coat shall conform to the provisions in Section 39-2.01C(3)(f), “Tack Coat,” of the Standard Specifications and shall be included in the per ton price for HMA and no additional payment will be allowed therefor.

HMA paving on street and behind driveways must conform to HMA requirement found in section 39-2.02 of the Standard Specifications.

In the overlay areas the existing cross slopes are variable, the contractor shall notify the Engineer of existing roadway paved areas where the existing slope is not 1.5% minimum. The Engineer will direct the corrective paving as change order work.

39.B Pavement Edge Treatments
Attention is directed to Section 39-2.01C(5) “Pavement Edge Treatments” of the Standard Specifications.

39.C Place Hot Mix Asphalt Dike (Type A) and Miscellaneous Areas Attention is directed to Section 39-2.01D “Payment” of the Standard Specifications.

Delete the 6th paragraph of Section 39-2.01D:
276
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 82
Payment for place hot mix asphalt (miscellaneous areas), will be included in the price paid for Surface Restoration and no additional compensation will be allowed therefor.

39.D Minor Hot Mix Asphalt
Attention is directed to Section 39-2.07 “Minor Hot Mix Asphalt” of the Standard Specifications.

Minor Hot Mix Asphalt shall be Type-A Hot Mix Asphalt (HMA), PG 64-10 asphalt binder, and 1/2“aggregate gradation, and the thickness of Minor HMA will be a minimum of 0.17’ unless otherwise noted on the plans.

39.E Remove Asphalt Concrete Dike
Attention is directed to Section 39-3.03 “Remove Asphalt Concrete Dike” of the Standard Specifications.

39.F Remove Base and Surfacing
Attention is directed to Section 39-3.05 “Remove Base and Surfacing” of the Standard Specifications.

Section 40 Concrete Pavement
Refer to Section 40 “Concrete Pavement” of the Standard Specifications.

40.A Continuously Reinforced Concrete Pavement
Attention is directed to Section 40-2 “Continuously Reinforced Concrete Pavement” of the Standard Specifications. All references to wide flange beam terminals and pavement anchors shall be deleted. 140.D Summary
Replace section 40-2.01A with:

Section 40-2 includes specifications for constructing continuously reinforced concrete pavement.

Constructing continuously reinforced concrete pavement includes terminal joints and expansion joints.

Do not install wide flange beam terminals or pavement anchors.

The concrete shall be integrally pigmented colored concrete. 240.D Payment
Replace section 40-2.04 with:

Bar reinforcement is included in the payment for continuously reinforced concrete pavement.

Section 51 Concrete Structures
Refer to Section 51, “Concrete Structures” of the Standard Specifications.

51.A Structural Concrete, Drainage Inlet
Attention is directed to Section 51-1 “Concrete Structures” of the Standard Specifications. 151.D Payment
Add to section 51-1.04:

Metal frames and covers or frames and grates are included in the payment for structural concrete, drainage inlet.
277
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 83

51.B Minor Concrete
Attention is directed to Section 90-2 “Minor Concrete” of the Standard Specifications.

51.C Minor Concrete (Minor Structure)
Attention is directed to Section 51-7 “Minor Structures” of the Standard Specifications. 151.D Payment
Replace the 2nd paragraph of section 51-7.01D with:

Metal frames and covers or frames and grates are included in the payment for minor concrete, (minor structure) required for storm drain manholes.

Section 64 Plastic Pipe
Refer to Section 64 “Plastic Pipe” of the Standard Specifications.

64.A Plastic Pipe
Attention is directed to Section 64-2 “Plastic Pipe” of the Standard Specifications.

64.B Trench Backfill
Attention is directed to Section 64-2.02B “Backfill” of the Standard Specifications.

Attention is directed to details as shown on the plans. In certain circumstances where the cover is less than 36 inches, backfill shall be placed following these scenarios:
• 24 inches or less - the backfill required shall be surface type per plan and then slurry down to the halfway depth of the pipe.
• Between 24 inches and 36 inches - backfill will consist of surface type per plan, 18 inches of slurry and then native soil down to the pipe.
• 36 inches or more - backfill shall follow the town of paradise standard detail TB1 referring to trench backfill and restoration requirements.

64.C Payment
Full compensation for sawcutting, trenching, excavation, backfill, and connection appurtenances shall be included in the various bid items for plastic pipe, and no additional payment will be allowed, therefore.

Section 73 Concrete Curbs and Sidewalks
Refer to Section 73, “Concrete Curbs and Sidewalks” of the Standard Specifications.

Add to section 73-1.02A:

Concrete must be minor concrete complying with section 90-2 and may contain returned plastic concrete complying with section 90-9.

73.A Minor Concrete (Curb & Gutter), Minor Concrete (Sidewalk), Minor Concrete (Curb Ramp), (Miscellaneous Construction)
Attention is directed to Section 73-2 “Curbs” and 73-3 “Sidewalks, Gutter Depressions, Island Paving, Curb Ramps, Driveways.
278
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 84
Add to Section 73-1.03A:

Four inches (4") Class II Aggregate Base will be underneath all new Curb and Gutter, Sidewalk, and Curb Ramp per the Town of Paradise's requirement and has been quantified separately under the Section 26 “Class II Aggregate Base”.

Add to Section 73-3.03
Where curb ramps and sidewalks are to be constructed adjacent to existing asphalt concrete paving that is outside of the roadway, you will sawcut the existing pavement in a neat line, remove existing asphalt and subgrade to the required depth to complete the concrete installation, and place Minor HMA upon placement of the minor concrete as shown.

73.B Remove Concrete
Attention is directed to Section 15-1.03B “Removing Concrete” of the Standard Specifications.

Section 77 Local Infrastructure
Add the following Sections:
77-1: Ductile Iron Pipe and Fittings
77-2: Polyvinyl Chloride (PVC) Pressure Pipe and Fittings 77-3: Conveyance Piping General
77-4: Water Utility Distribution Valves
77-5: Water Utility Distribution Fire Hydrants
77-6: Disinfection of Water Utility Distribution Facilities 77-1 Ductile Iron Pipe and Fittings
77-1-1 PART 1 GENERAL

1.01 REFERENCES
A. The following is a list of standards that may be referenced in this section:

1. American Association of State Highway and Transportation Officials (AASHTO): T99, Standard Method of Test for the Moisture-Density Relations of Soils Using a 2.5 kg (5.5 lb) Rammer and a 305 mm (12 in.) Drop.

2. American Society of Mechanical Engineers (ASME):
a. B16.21, Nonmetallic Flat Gaskets for Pipe Flanges.
b. B16.42, Ductile Iron Pipe Flanges and Flanged Fittings Classes 150 and 300.

3. American Water Works Association (AWWA):
a. C104/A21.4, Cement-Mortar Lining for Ductile-Iron Pipe and Fittings. b. C105/A21.5, Polyethylene Encasement for Ductile-Iron Pipe Systems. c. C110/A21.10, Ductile-Iron and Gray-Iron Fittings.
d. C111/A21.11, Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings. e. C115/A21.15, Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Fittings. 279
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 85
f. C116/A21.16, Protective Fusion-Bonded Epoxy Coatings for the Interior and Exterior Surfaces of Ductile-Iron and Gray-Iron Fittings for Water Supply Service. g. C150/A21.50, Thickness Design of Ductile-Iron Pipe.
h. C151/A21.51, Ductile-Iron Pipe. Centrifugally Cast, for Water. i. C153/A21.53, Ductile-Iron Compact Fittings for Water Service. j. C600, Installation of Ductile-Iron Water Mains and Their Appurtenances. k. C606, Grooved and Shouldered Joints.
l. C651, Disinfecting Watermains.

4. ASTM International (ASTM):
a. A307, Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength.
b. A563, Standard Specification for Carbons and Alloy Steel Nuts. c. A674, Polyethylene Encasement for Ductile Iron Pipe. d. A746, Ductile Iron Gravity Sewer Pipe.
e. D882, Standard Test Method for Tensile Properties of Thin Plastic Sheeting. f. D1330, Standard Specification for Rubber Sheet Gaskets. g. D1922, Standard Test Method for Propagation Tear Resistance of Plastic Film and Thin Sheeting by Pendulum Method.
h. D2000, Standard Classification System for Rubber Products in Automotive Applications. i. D4976, Standard Specification for Polyethylene Plastics Molding and Extrusion Materials.

5. International Organization for Standardization (ISO):
a. 9001, Quality Management Systems—Requirements.
b. 8179-1: Ductile iron pipes, fittings, accessories and their joints—External zinc-based coating—Part 1: Metallic zinc with finishing layer.
c. Part 2: Zinc Rich Paint.

6. NSF/ANSI 61: Drinking Water System Components – Health Effects. 77-1-1.02 SUBMITTALS
A. Action Submittals:

1. Shop Drawings: Marking plan and details of standard pipe section showing dimensions, pipe joints, fitting and special fitting pressure rating and thickness, size, coating, and lining data.

B. Informational Submittals:

1. Manufacturer’s certification of facility’s experience.

2. Confirmation of manufacturer’s ISO registration or names of proposed independent agency for factory quality assurance.

3. Manufacturing inspection report from ISO certified manufacturer or independent inspection agency.

4. Furnish manufacturer’s certification that pipe and fittings have been manufactured, tested, and inspected in accordance with this Specification and referenced standards. 280
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 86

5. Field Hydrostatic Testing Plan: Submit at least 15 days prior to testing and at minimum, include the following:
a. Testing dates.
b. Piping systems and section(s) to be tested.
c. Method of isolation.
d. Method of conveying water from source to system being tested. e. Calculation of maximum allowable leakage for piping section(s) to be tested.

6. Certifications of Calibration: Approved testing laboratory certificate if pressure gauge for hydrostatic test has been previously used. If pressure gauge is new, no certificate is required.

7. Test documentation form and results.

1.03 QUALITY ASSURANCE
A. Pipe Manufacturer: If not ISO 9001 registered, provide services of an independent inspection agency.

B. Independent inspection agency requirements for manufacturer’s not ISO 9001 registered:

1. Submit names of at least two independent inspection agencies for approval minimum of 2 weeks prior to start of manufacturing.

2. Approved Inspection Agency Daily Responsibilities: Sample monitoring of chemical and mechanical tests, sample visual inspection of quality assurance tests performed on inprocess pipe and fittings, and sample visual and dimensional inspection on finished products.
77-1-2 PART 2 MATERIALS

2.01 MATERIALS
A. General:

1. Ductile Iron Pipe: Manufactured, lined, coated, and tested domestically in the United States of America.

2. Ductile Iron Fittings: Manufactured, lined, coated, and tested domestically in the United States of America.

3. Source Manufacturing Facility Experience: Certify production of ductile iron pipe of specified diameters, pressure, dimensions, and standards for a period of not less than 10 years.

4. Ductile iron pipe and fitting shall be supplied by single manufacturer.

B. Pipe:

1. General:
a. Pipe: New and recently manufactured. Refurbished pipe is not acceptable. b. Lined and coated as specified.

2. Meet requirements of AWWA C150/A21.50, AWWA C151/A21.51, and AWWA C111/A21.11.

3. Centrifugally cast, grade 60 42 10 iron.
281
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 87

4. Pressure Rating of Pipe from 4 Inches to 12 Inches in Diameter: 200psi.

5. Minimum Pipe Wall Thickness:
a. Threaded Pipe for Flanged Pipe End: Special thickness Class 53 from 12 inch to 54 inchpipe in accordance with AWWA C115/A21.15.
b. Grooved End Pipe: Special Class 53.

C. Joints:

1. Push-On Joint: Rated at minimum working pressure equal to pipe material design.

2. Restrained Joint:
a. Manufactured proprietary joint that mechanically restrains pipe to adjoining pipe. b. Manufacturers and Products:
1) American Cast Iron Pipe; Flex-Ring, Field Flex-Ring, and Lok-Ring. 2) McWane Ductile; Thrust-Lock.
3) U.S. Pipe; TR Flex and HP Lok.

3. Type Joint:
a. Prior to purchase and installation, submit type and application of this joint for approved by the Engineer.

4. Set screws for restraint or field-lock gaskets are not allowed.

5. Grooved Joint:
a. Rigid type radius cut grooved, conforming to AWWA C606. b. Manufacturer: Victaulic Company of America.

6. Ball Joint:
a. Meet requirements of AWWA C151/A21.51.
b. Minimum Working Pressure:
1) 4 inch through 12 inch Diameter: 250 psi.
2) Larger than 12 inch Diameter: 250 psi.
c. Manufacturers and Products:
1) American Cast Iron Pipe; Flex-Lock.
2) U.S. Pipe; USIFLEX.

D. Fittings:

1. New and recently manufactured. Refurbished fittings will not be accepted.

2. Mechanical, Push-On, Flanged, or Restrained Joint: In accordance with the following table:

Minimum Pressure Ratings for AWWA C110/A21.10 and C115/A21.15 Ductile Iron Fittings Diameter
(inches) Rubber Gasket Joints
(Push-on, Mechanical, Restrained)
(psi) Flanged Joints
(psi)
3 to 24 350 250
30 to 48 250 250
Minimum Pressure Ratings for AWWA C153/A21.53 Ductile Iron Fittings 282
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 88
Diameter
(inches) Rubber Gasket Joints
(Push-on, Mechanical, Restrained)
(psi) Flanged Joints
3 to 24 350 Not included in C153/A21.53 (refer to the C110/A21.10 Standard) 30 to 48 250 Not included in C153/A21.53 (refer to the C110/A21.10 Standard) 54 to 64 150 150 psi

3. Rubber Gasket Joints Including Mechanical Joints, Push-On Joints, and Flanged Joints: In accordance with AWWA C111/A21.11 [B: or ASME B16.42].

4. Mechanical Joint Fittings: In accordance with AWWA C110/A21.10 and AWWA C153/A21.53.

5. Grooved End Fittings:
a. Radius cut grooved, rigid]type conforming to AWWA C110/A21.10 and AWWA C153/A21.53.
b. Manufacturers:
1) Victaulic Company of America.
2) Gustin-Bacon.

E. Welded Outlet: Only weld to pipe in manufacturer’s shop.

F. Lining:

1. Pipe and Fittings for Clean Water Applications: cement-lined and asphaltic seal coated as recommended by manufacturer in accordance with AWWA C104/A21.4.

2. 3. Pipe and Fitting Lining for Domestic Water Service: Comply with requirements of AWWA C116/A21.16.

G. Coating: Asphaltic type, 1 mil thick, in accordance with AWWA C151/A21.51, AWWA C115/A21.15, AWWA C110/A21.10, and AWWA C153/A21.53.

H. Polyethylene Encasement:

1. Virgin polyethylene raw material conforming to requirements of ASTM D4976.

2. Elongation: 800 percent, minimum, in machine and transverse direction (ASTM D882).

3. Tensile Strength: 3,600 psi, minimum.

4. Dielectric Strength: 800V per mil-thickness, minimum.

5. Propagation Tear Resistance: 2,550 gram force (gf), minimum, in machine and transverse direction (ASTM D1922).

6. Tube Form: Conform to AWWA C105/A21.5.

7. Film: 0.008 inch (8 mil) thick, minimum.

8. Number of Film Layers: One.

I. Bolting:

1. Flanged Connection Bolts: Carbon steel, ASTM A307, Grade A hex bolts and ASTM A563, Grade A hex head nuts.

2. Grooved End Connections Bolts: Manufacturer’s standard.

J. Gaskets:

1. Flat Faced Flange Gaskets:
283
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 89
a. Pipe Smaller Than 54 Inches: Rated for working pressure 150 psi to 250 psi, 1/8 inch thick, red rubber (SBR), hardness 80 (Shore A), rated to 200 degrees F, conforming to ASME B16.21, AWWA C207, and ASTM D1330, Grade 1 and Grade 2. b. Pipe 54 Inches and Larger: Rated for working pressure greater than 250 psi; Toruseal gaskets as manufactured by American Ductile Iron Pipe or Flange-Tyte gaskets as manufactured by U.S. Pipe.

2. Grooved End Joint Gaskets: Halogenated butyl, conforming to ASTM D2000 and AWWA C606.

2.02 SOURCE QUALITY CONTROL
A. Factory Tests:

1. General:
a. Perform tests on pipe with metal thickness equal to that specified. b. Confirm that pipe passes hydrostatic test prior to shipment.

2. Hydrostatic Proof Test:
a. Pipe: Perform at 500 psi for a minimum duration of 10 seconds. b. Pipe 30 Inches and Larger:
1) Additionally test to 75 percent of minimum yield strength 2) Minimum Test Duration: 10 seconds.
c. Record each test cycle on a strip chart.
d. Mark test cycle for 30 inch and larger pipe by pipe number. e. Inspect pipe during testing for leaks.
f. Reject pipe which shows evidence of leaks.
g. Repair welding of leaks is not permitted.

3. Perform 15 psi air test on welded-on outlet pipe.

4. Measure pipe ends (spigot end, bell, and socket) with suitable gauges at sufficiently frequent intervals to confirm compliance to standard dimensions of AWWA C151/A21.51. a. Inspect each socket and spigot in well-lighted area for significant defects which could affect joint performance.
b. Remove defects by cutting pipe ends.
c. Reject pipe with significant defects in the bell.
d. Document measurement of each end of each 18 inch diameter and larger pipe, including pipe number, and approval by manufacturer’s quality assurance inspector to meet tolerances.

5. Document successful testing of restrained joints in the sizes specified to at least twice the specified pressure rating of the joint without leakage or failure.

6. Submit a certified inspection report of witnessed tests, with results organized by pipe number, within 10 days of the inspection.
77-1-3 PART 3 CONSTRUCTION

3.01 EXAMINATION
A. Inspect pipe and fittings to confirm no cracked, broken, or otherwise defective materials are used.
284
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 90

3.02 PREPARATION
A. Trench Grade:

1. Grade bottom of trench to specified line and grade with proper allowance for pipe thickness and pipe base. Prepare trench bottom to form a continuous and uniform bearing and support for pipe between bell holes.

2. Before laying each section of pipe, check grade and correct irregularities found. Grade may be disturbed for removal of lifting tackle.

B. Pipe Bedding:

1. Place and compact pipe bedding material as follows:
a. Install to full width of trench, from the following depths below bottom to springline of pipe:
1) Pipe 12 Inch Diameter: 4 inches to 6 inches.
2) Pipe Larger than 12 Inch Diameter: 6 inches to 8 inches. b. Compact to at least 95percent of its maximum density as determined by AASHTO T99. c. Confirm that no unfilled or uncompacted areas occur beneath pipe.

C. Bell (Joint) Holes: At each joint, dig bell holes of ample dimensions in bottom of trench, and at sides where necessary, to permit joint to be made properly and to permit easy visual inspection of entire joint.

3.03 INSTALLATION
A. General:

1. Provide and use proper implements, tools, and facilities for safe prosecution of the Work.

2. Lower pipe, fittings, and appurtenances into trench, piece by piece, with a crane, slings, or other suitable tools and equipment, taking care to prevent damage to pipe materials, protective coatings, and linings.

3. Do not drop or dump pipe materials into trench.

B. Cleaning Pipe and Fittings:

1. Remove lumps, blisters, and excess coal tar coating from bell and spigot ends of each pipe. Wire brush outside of spigot and inside of bell and wipe clean, dry, and free from oil and grease before pipe is laid.

2. Wipe ends of mechanical joint pipe and fittings and of rubber gasket joint pipe and fittings clean of dirt, grease, and foreign matter.

C. Laying Pipe:

1. Direction of Laying: Lay pipe with bell end facing in direction of laying. For lines on an appreciable slope, face bells upgrade at discretion of Engineer.

2. Mechanical Joint, Push-On Joint, and Restrained Joint Pipe: After first length of pipe is installed in trench, secure pipe in place with approved backfill material tamped under and along sides to prevent movement. Keep ends clear of backfill. After each section is jointed, place backfill as specified to prevent movement.

3. Take precautions necessary to prevent floating of pipe prior to completion of backfill operation.
285
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 91

4. When using movable trench shield, prevent pipe joints from pulling apart when moving shield ahead.

5. Do not allow foreign material to enter pipe while it is being placed in trench.

6. Close and block open end of last laid section of pipe to prevent entry of foreign material or creep of gasketed joints when laying operations are not in progress, at close of day’s work, and whenever workers are absent from Job.

D. Joining Push-On Joint Pipe and Mechanical Joint Fittings:

1. Join pipe with push-on joints and mechanical joint fittings in accordance with manufacturer’s recommendations.

2. Provide special tools and devices, such as special jacks, chokers, and similar items required for installation.

3. Lubricate pipe gaskets using lubricant furnished by pipe manufacturer. No substitutes will be permitted.

4. Clean ends of fittings of dirt, mud, and foreign matter by washing with water and scrubbing with a wire brush, after which, slip gland and gasket on plain end of pipe. If necessary, lubricate end of pipe to facilitate sliding gasket in place, then guide fitting onto spigot of pipe previously laid.

E. Ball Joint Pipe:

1. Assemble and install in accordance with manufacturer’s recommendations.

2. Hydrostatic Test:
a. Conduct on ball joint pipe independent of other pipe systems/type being installed. b. Conduct test in accordance with requirements of these Specifications and manufacturer’s recommendations.

F. Cutting Pipe:

1. General: Cut pipe for inserting valves, fittings, or closure pieces without damaging pipe or lining and leaving a smooth end, at right angles to axis of pipe.

2. Pipe: Cut pipe with milling type cutter or saw. Do not flame cut.

3. Dressing Cut Ends: Dress cut end of mechanical joint pipe to remove sharp edges or projections which may damage rubber gasket. Dress cut ends of push-on joint pipe by beveling, as recommended by manufacturer.

G. Field Welding:

1. Use of field welded outlets will not be allowed. Perform welding for outlets only in pipe manufacturer’s shop.

2. Field installed outlets may be installed with saddle approved by Engineer. a. Machine cut pipe opening, do not use a cutting torch.

3. Field welding of bars for restrained joint systems will not be allowed. Perform welding in pipe manufacturer’s shop.

H. Line and Grade:

1. Minimum Pipe Cover: 3 feet, unless otherwise indicated.

2. No high points will be allowed between air valves.

3. Maintain pipe grade between invert elevations to provide minimum clearance at air valve locations of 4 feet from existing ground surface to top of pipe. 286
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 92

4. Install air valves as shown and field verify intervening low points. When field conditions warrant, exceptions may be made upon approval of Engineer.

5. Deviations exceeding 6 inches from specified line or 1 inch from specified grade will not be allowed without express approval of Engineer.

6. Reinstall pipeline sections that are not installed to elevations shown or otherwise approved by Engineer to proper elevation.

I. Thrust Restraint:

1. Primary Method of Restraint: Restrained joint pipe. Thrust blocking shall be used where detailed on Drawings and as approved by Engineer.

J. Pipeline Hydrostatic Test:

1. General:
a. Notify Engineer in writing 5 days in advance of testing. Perform testing in presence of Engineer.
b. Successful final hydrostatic test with water is required for newly installed pipelines prior to acceptance.
c. Furnish testing equipment and perform tests in accordance with approved hydrostatic testing plan. Use testing equipment that provides observable and accurate measurements of make-up water under specified conditions.
d. Isolate new pipelines from existing pipelines.
e. Conduct tests on entire pipeline after trench has been backfilled. Testing may be done prior to placement of asphaltic concrete or roadway structural section. f. Contractor may, if field conditions permit and as determined by Engineer, partially backfill trench, leave joints open for inspection, and conduct an initial hydrostatic test.

Initial test does not replace final hydrostatic test conducted after backfill is complete. g. Test Water Supply: Is available from hydrants within the Town. Secure written permission for connection and use from PID and meet requirements for use. h. Dispose of water used in testing in accordance with Specifications and regulations.

2. Procedure:
a. Maximum Filling Velocity: 0.25 foot per second, calculated based on the full area of pipe.
b. Expel air from pipe system during filling. Expel air through air release valve or through corporation stop installed at high points and other strategic points. c. Test Pressure: 150 psi as measured at low point of pipeline. d. Apply and maintain specified test pressure with hydraulic force pump. Valve off piping system when test pressure is reached.
e. Maintain hydrostatic test pressure continuously for 2 hours minimum, adding make-up water only as necessary to restore test pressure.
f. Determine actual make-up volume by measuring quantity of water necessary to maintain specified test pressure for duration of test.
g. If measured make-up volume exceeds allowable amount or if leaks are visible, repair defective pipe section and repeat hydrostatic test.
287
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 93

3. Maximum Allowable Make-up Water Volume: Applicable testing allowance stated in AWWA C600.

END OF SECTION 77-1
77-2 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE AND FITTINGS 77-2-1 PART 1 GENERAL

1.01 REFERENCES
A. The following is a list of standards which may be referenced in this section:

1. American Water Works Association (AWWA):
a. C110, Ductile-Iron and Gray-Iron Fittings.
b. C153, Ductile-Iron Compact Fittings, for Water Service. c. C605, Underground Installation of Polyvinyl Chloride (PVC) and Molecularly Oriented Polyvinyl Chloride (PVCO) Pressure Pipe and Fittings.
d. C900, Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 Inches Through 12 Inches (100 mm Through 300 mm), for Water Transmission and Distribution. e. C905, Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 14 Inches through 48 Inches (350 mm through 1,200 mm) for Water Transmission and Distribution. f. C907, Injection-Molded Polyvinyl Chloride (PVC) Pressure Fittings, 4 Inches through 12 Inches (100 mm Through 300 mm), for Water, Wastewater, and Reclaimed Water Service.

2. ASTM International (ASTM):
a. D2241, Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series).
b. D2321, Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications.
c. D2466, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40. d. D2467, Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80. e. D2672, Standard Specification for Joints for IPS PVC Pipe Using Solvent Cement. f. D2855, Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings.
g. D3139, Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals.

3. NSF International (NSF).
77-2-1.02 SUBMITTALS
288
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 94
A. Action Submittals: Drawings showing pipe diameter, pipe class, dimension ratio (DR) and fitting details.

B. Informational Submittals:

1. Hydrostatic Testing Plan: Submit at least 15 days prior to testing and at minimum, include the following:
a. Testing dates.
b. Piping systems and section(s) to be tested.
c. Method of isolation.
d. Method of conveying water from source to system being tested. e. Method of disposing of test water.
f. Calculation of maximum allowable leakage for piping section(s) to be tested.

2. Certification of Calibration: Approved testing laboratory certificate if pressure gauge for hydrostatic test has been previously used. If pressure gauge is new, no certificate is required.

3. Test report documentation.

1.03 DELIVERY, STORAGE, AND HANDLING
A. Solvent Cement: Store in accordance with ASTM D2855. 77-2-2 PART 2 MATERIALS

2.01 MATERIALS
A. Pipe:

1. PVC, conforming to requirements of AWWA C900

2. DR shall be 18.

3. Pipe to be used for potable water conveyance shall meet the requirements of NSF 61 B. Joints:

1. Rubber gasketed.

2. Conform to AWWA C900
C. Fittings: Ductile iron, conforming to AWWA C153 or AWWA C110. PVC conforming to AWWA C900, C905, or C907
D. Restrained Joints:

1. Provide pipe restraint, where indicated on Drawings, by system designed specifically for use with PVC pipe using wedges. Do not use systems with set screws, gripper rings, or gripper gaskets.

2. Minimum Pressure Rating: 250
77-2-3 PART 3 CONSTRUCTION

3.01 INSTALLATION
A. In accordance with AWWA C605
B. Solvent cement used for joints as recommended by pipe manufacturer.

C. Joints:

1. Rubber Gasketed: In accordance with manufacturer’s written instructions.

2. Solvent Cemented: In accordance with ASTM D2855.
289
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 95

3. Restrained Joint Systems: In accordance with manufacturer’s written instructions.

D. Pipe Bending for Horizontal or Vertical Curves:

1. Bending of pipe barrels larger than 12 inches in diameter is not allowed.

2. Radius of curves shall not exceed 75 percent of manufacturer’s recommended values.

3. Use blocks or braces at pipe joints to ensure axial deflection in gasketed or mechanical joints does not exceed allowable deflection.

E. Maximum Joint Deflection at Mechanical Joint: 75 percent of manufacturer’s recommended values.

3.02 INSPECTION AND HYDROSTATIC TESTING
A. General:

1. Notify Engineer in writing at least 5 days in advance of testing. Perform testing in presence of Engineer.

2. Using water as test medium, all newly installed pipelines must successfully pass hydrostatic leakage test prior to acceptance.

3. Conduct field hydrostatic test on buried piping after trench has been completely backfilled and compacted. Testing may, as approved by Engineer, be done prior to placement of asphaltic concrete or roadway structural section.

4. Contractor may, if field conditions permit and as approved by Engineer, partially backfill trench and leave joints open for inspection and conduct an initial informal service leak test. Final field hydrostatic test shall not, however, be conducted until backfilling has been completed as specified above.

5. Supply of Temporary Water

6. Dispose of water used in testing in accordance with federal, state, and local requirements.

7. Install temporary thrust blocking or other restraint as necessary to prevent movement of pipe and protect adjacent piping or equipment. Make necessary taps in piping prior to testing.

8. Wait a minimum of 5days after concrete thrust blocking is installed to perform pressure tests. If high-early strength cement is used for thrust blocking, wait may be reduced to2days.

9. Prior to test, remove or suitably isolate appurtenant instruments or devices that could be damaged by pressure testing.

10. New Piping Connected to Existing Piping:
a. Isolate new piping with grooved-end pipe caps, blind flanges, or other means as acceptable to Engineer.
b. Provide appropriate thrust blocking.

B. Hydrostatic Testing Procedure:

1. Furnish testing equipment, as approved by Engineer, which provides observable and accurate measurements of leakage under specified conditions.

2. Maximum Filling Velocity: 0.25 foot per second calculated based on full area of pipe.

3. Expel air from piping system during filling.

4. Test Pressure: 150 psi as measured at low point of pipeline.

5. Apply and maintain specified test pressure with hydraulic force pump. Valve off piping system when test pressure is reached.
290
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 96

6. Maintain hydrostatic test pressure continuously for 2 hours minimum, adding make-up water only as necessary to restore test pressure to within 5 psi of specified hydrostatic test pressure.

7. Determine actual leakage by measuring quantity of water necessary to maintain specified test pressure for duration of test.

C. Maximum Allowable Leakage:
where:

L = Allowable leakage, in gallons per hour.

N = Number of joints in tested line.

D = Nominal diameter of pipe, in inches.

P = Average test pressure during leakage test, in pounds per square inch.

END OF SECTION 77-2
77-3 CONVEYANCE PIPING GENERAL
77-3-1 PART 1 GENERAL

1.01 REFERENCES
A. The following is a list of standards which may be referenced in this section:

1. American Concrete Institute (ACI): 301, Specifications for Structural Concrete.

2. American Water Works Association (AWWA):
a. C110/A21.10, Ductile-Iron and Gray-Iron Fittings.
b. C115/A21.15, Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded Flanges. c. C207, Steel Pipe Flanges for Waterworks Service - Sizes 4 in. Through 144 in. (100 mm Through 3,600 mm).
d. C210 Liquid-Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines. e. C213, Fusion-Bonded Epoxy Coating for the Interior and Exterior of Steel Water Pipelines. f. C217, Petrolatum and Petroleum Wax Tape Coatings for the Exterior of Connections and Fittings for Steel Water Pipelines.
g. C219, Bolted, Sleeve-Type Couplings for Plain-End Pipe. h. C221, Fabricated Steel Mechanical Slip-Type Expansion Joints. i. C606, Grooved and Shouldered Joints.

3. ASTM International (ASTM):
a. A497/A497M, Standard Specification for Steel Welded Wire Reinforcement, Deformed, for Concrete.
b. A615/A615M, Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement.
c. C94/C94M, Standard Specification for Ready-Mixed Concrete. d. C150/C150M, Standard Specification for Portland Cement. e. F593, Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs.

4. NSF International (NSF):
291
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 97
a. NSF/ANSI 61, Drinking Water System Components - Health Effects. b. NSF/ANSI 372, Drinking Water System Components - Lead Content. 77-3-1.02 SUBMITTALS
A. Action Submittals:

1. Detailed pipe fabrication drawings showing pipe details, special fittings and bends, dimensions, coatings, and other pertinent information.

2. Layout drawing showing location of each pipe section and each special length.

3. Pipe pressure class.

4. Wall thickness, reinforcing, and strength calculations.

5. Product Data: Manufacturer’s data for couplings, saddles, gaskets, and other pipe accessories. Indicate maximum rated working pressure and test pressure for each item.

1.03 DELIVERY, STORAGE, AND HANDLING
A. In accordance with manufacturer’s recommendations
B. Marking at Plant: Mark each pipe and fitting at plant. Include date of manufacture, manufacturer’s identification, specification standard, diameter of pipe dimension ratio, pipe class, and other information required for type of pipe.

C. Pipe, specials, and fittings received at Project Site in damaged condition will not be accepted.

D. Gasket Storage: Store rubber gaskets in cool, well ventilated place, and do not expose to direct rays of sun. Do not allow contact with oils, fuels, petroleum, or solvents.

E. Store and support pipe securely to prevent accidental rolling and to avoid contact with mud, water, or other deleterious materials.

F. Handling:

1. Pipe shall be handled with proper equipment in a manner to prevent distortion or damage.

Use of hooks, chains, wire ropes, or clamps that could damage pipe, damage coating or lining, or kink and bend pipe ends is not permitted.

2. Use heavy canvas, or nylon slings of suitable strength for lifting and supporting materials.

3. Lifting pipe during unloading or lifting into trench shall be done using two slings placed at quarter point of pipe section. Pipe may be lifted using one sling near center of pipe, provided pipe is guided to prevent uncontrolled swinging and no damage will result to pipe or harm to workers. Slings shall bear uniformly against pipe.

4. Pipe and fittings shall not be stored on rocks or gravel, or other hard material that might damage pipe. This includes storage area and along pipe trench. 77-3-2 PART 2 PRODUCTS

2.01 GENERAL
A. Components and Materials in Contact with Water for Human Consumption: Comply with the requirements of the Safe Drinking Water Act and other applicable federal, state, and local requirements.

Provide certification by manufacturer or an accredited certification organization recognized by the 292
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 98
Authority Having Jurisdiction that components and materials comply with the maximum lead content standard in accordance with NSF/ANSI 61 and NSF/ANSI 372.

1. Use or reuse of components and materials without a traceable certification is prohibited.

2.02 PIPE
A. As specified in the individual specification(s) following this section.

2.03 JOINTS
A. As specified in the individual specification(s) following this section.

2.04 COUPLINGS
A. General:

1. Coupling linings for use in potable water systems shall be in conformance with NSF/ANSI 61.

2. Couplings shall be rated for appropriate operating pressure and hydrostatic test pressure.

3. Exposed, bolted, sleeve-type couplings shall be lined and coated with fusion bonded epoxy in accordance with AWWA C213

4. Buried, bolted, sleeve-type couplings shall be lined and coated with fusion-bonded epoxy in accordance with AWWA C213
B. Bolting Materials for Couplings: In accordance with the applicable AWWA standard.

2.05 SERVICE SADDLES
A. Double strap design rated for 150 psi minimum working pressure.

2.06 SLAB, FLOOR, WALL, AND ROOF PENETRATIONS
A. Modular Mechanical Seal:

1. Type: Interconnected synthetic rubber links shaped and sized to continuously fill annular space between pipe and wall sleeve opening.

2. Assemble interconnected rubber links with Type 316 stainless steel bolts, nuts, and pressure plates.

3. Size modular mechanical seals according to manufacturer’s instructions for the size of pipes shown to provide a watertight seal between pipe and wall sleeve opening.

4. Manufacturers and Products:
a. Thunderline/LinkSeal, Div. of PSI, Houston, TX; Link Seal. b. Calpico, Inc., South San Francisco, California; Sealing Linx. c. Advance Products and Systems, Lafayette, Louisiana; Innerlynx.

B. Wall Sleeves:

1. Diameter, ends, and length shall be as shown on Drawings.

2. Shall include integral seep ring to minimize seepage between metal sleeve and concrete.

C. Wall Couplings:

1. Diameter, ends, and length shall be as shown on Drawings.

2. Wall couplings shall provide flexible mechanical joint.

3. Body and end rings shall be coated with fusion bonded epoxy.

4. Body shall include integral seep ring.

5. Shall comply with AWWA C219.

2.07 FLANGES, FLANGE GASKETS, AND BOLTING MATERIALS
293
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 99
A. As specified in individual specifications following this section.

B. Flanges, bolting materials, and flange gaskets for steel flanges shall conform to AWWA C207.

C. Flanges, bolting materials, and flange gaskets for ductile iron flanges shall conform to AWWA C110 and AWWA C115.

2.08 FLANGE INSULATION KITS AND INSULATING COUPLINGS

2.09 CONCRETE FOR THRUST BLOCKS
A. Thrust Block Concrete: The quantity of water used shall be just sufficient, with a normal mixing period, to produce a concrete, which, in the judgment of the District, can be worked into place without segregation.

B. Reinforcing Steel: ASTM A615/A615M, Grade 60 deformed bars.

C. Welded Wire Fabric: ASTM A497/A497M.

D. Formwork: Plywood
E. Mix: ASTM C94/C94M, Option A.

1. Cement: ASTM C150/C150M, Type I

2. Coarse Aggregate Size: 1 1/2inch(es).

3. Design for Minimum Compressive Strength at 28 Days: 1,500 psi.

2.10 PIPE LOCATING TAPE
A. Detectable (Install with nonmetallic pipelines):

1. Solid aluminum foil, visible on unprinted side, encased in protective high visibility, inert polyethylene plastic jacket.

2. Foil Thickness: Minimum 0.35 mils.

3. Laminate Thickness: Minimum 5 mils.

4. Width: 6 inches.

5. Identifying Lettering: Minimum 1-inch high, permanent black lettering imprinted continuously over entire length.

6. Joining Clips: Tin or nickel-coated furnished by tape manufacturer.

7. Color: In accordance with APWA Uniform Code
B. Nondetectable

1. Inert polyethylene, impervious to known alkalis, acids, chemical reagents, and solvents likely to be encountered in soil.

2. Thickness: Minimum 5 mils.

3. Width: 6 inches.

4. Identifying Lettering: Minimum 1-inch high, permanent black lettering imprinted continuously over entire length.

5. Color: In accordance with APWA Uniform Code
C. TRACER WIRE (Install with nonmetallic pipelines):

1. Material: Minimum 12-gauge solid copper or copper jacket with a steel core, with high-density polyethylene (HDPE) or high-molecular weight polyethylene (HMWPE) insulation suitable for direct bury.
294
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 100

2. Splices: Use wire nut or lug suitable for direct burial as recommended by tracer wire manufacturer.

2.11 PIPE BEDDING AND PIPE ZONE MATERIAL
A. Granular material or Controlled low strength material as specified in Section

2.12 TRENCH STABILIZATION MATERIAL
A. As specified in Section
77-3-3 PART 3 CONSTRUCTION

3.01 GENERAL
A. Notify Engineer at least 2 weeks prior to field fabrication of pipe or fittings.

B. Furnish feeler gauges of proper size, type, and shape for use during installation for each type of pipe furnished.

C. Distributing Materials: Place materials along trench only as will be used each day, unless otherwise approved by Engineer. Placement of materials shall not be hazardous to traffic or to general public, obstruct access to adjacent property, or obstruct others working in area.

3.02 EXAMINATION
A. Verify size, material, joint types, elevation, and horizontal location of existing pipeline to be connected to new pipeline or new equipment.

B. Inspect size and location of structure penetrations to verify adequacy of wall pipes, sleeves, and other openings.

C. Damaged Coatings and Linings: Repair using coating and lining materials in accordance with manufacturer’s instructions.

3.03 PREPARATION OF TRENCH
A. Prepare trench as specified in Section
B. Unless otherwise permitted by Engineer, maximum length of open trench shall not exceed 500 feet.

3.04 INSTALLATION
A. General:

1. Join pipe and fittings in accordance with manufacturer’s instructions, unless otherwise shown or specified.

2. Install individual pipe lengths in accordance with approved lay diagram. Misplaced pipe shall be removed and replaced.

3. Inspect pipe and fittings before installation, clean ends thoroughly, remove foreign matter and dirt from inside.

4. Flanged Joints:
a. Install perpendicular to pipe centerline.
b. Bolt Holes: Straddle vertical centerline, aligned with connecting equipment flanges or as shown on Drawings.
c. Use torque-limiting wrenches to provide uniform bearing and proper bolt tightness. d. Flange Type: Use flat-faced flange when joining with flat-faced ductile or cast iron flange. 295
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 101

5. Couplings:
a. Install in accordance with manufacturer’s written instructions. b. Before coupling, clean pipe holdback area of oil, scale, rust, and dirt. c. Remove pipe coating, if necessary, to obtain smooth surface. d. Clean gaskets before installation.
e. If necessary, lubricate with gasket lubricant for installation on pipe ends. f. Tighten coupling bolts progressively, drawing up bolts on opposite sides gradually until bolts have uniform tightness.

B. Buried Pressure Pipe:

1. Concrete Encased or Embedded Pipe: Do not encase joints in concrete, unless specifically shown on Drawings.

2. Placement:
a. Keep trench dry until pipe laying and joining is completed. b. Exercise care when lowering pipe into trench to prevent twisting or damage to pipe. c. Measure for grade at pipe invert, not at top of pipe. d. Excavate trench bottom and sides of ample dimensions to permit proper joining, welding, visual inspection, and testing of entire joint.
e. Prevent foreign material from entering pipe during placement. f. Close and block open end of last laid pipe section when placement operations are not in progress and at close of day’s work.
g. In general, lay pipe upgrade with bell ends pointing in direction of laying. h. Deflect pipe at joints for pipelines laid on a curve using unsymmetrical closure of spigot into bell. If joint deflection of standard pipe lengths will not accommodate horizontal or vertical curves in alignment, provide:
1) Shorter pipe lengths.
2) Special mitered joints.
3) Standard or special fabricated bends.
i. Check gasket position with feeler gauge to assure proper seating. j. After joint has been made, check pipe alignment and grade. k. Place sufficient pipe zone material to secure pipe from movement before next joint is installed.
l. Prevent uplift and floating of pipe prior to backfilling.

3. Tolerances:
a. Deflection From Horizontal Line: Maximum 2 inches.
b. Deflection From Vertical Line: Maximum 1 inch(es).
c. Joint Deflection: Maximum of 75 percent of manufacturer’s recommendation. d. Horizontal position of pipe centerline on alignment around curves maximum variation of 1 foot from position shown.

4. Cover Over Top of Pipe: Minimum 3 feet, unless otherwise shown.

5. Disposal of Excess Excavated Material: As specified in Section

3.05 THRUST RESTRAINT
A. Location: At pipeline tees, plugs, caps, bends, and locations where unbalanced forces exist. 296
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 102
B. Thrust Blocking:

1. Place only where shown on Drawings.

2. Quantity of Concrete: Sufficient to cover bearing area of pipe and provide required soil bearing area as shown on Drawings.

3. Place blocking so pipe and fitting joints are accessible for repairs.

4. Place concrete in accordance with ACI 301.

3.06 CORROSION PROTECTION
A. Buried Pipe: As specified in the individual specifications following this section.

B. Notify Engineer at least 3 days prior to start of surface preparation, coating application, and corrosion protection work.

3.07 PLACEMENT OF PIPE LOCATING TAPE
A. Place pipe locating tape in accordance with Section

3.08 PIPE BEDDING AND ZONE MATERIAL
A. Place pipe bedding and pipe zone material in accordance with Section

3.09 FIELD QUALITY CONTROL
A. Pressure Leakage Testing: As specified in the individual specification(s) following this section.

3.10 CLEANING AND DISINFECTION
A. Following assembly and testing, and prior to disinfection and final acceptance, flush pipelines with water at 2.5 fps minimum flushing velocity until foreign matter is removed. Dispose of water and flushed foreign matter.

B. Remove accumulated debris through blowoffs 2 inches and larger or by removing spools and valves from piping.

C. Disinfection: Disinfect according to AWWA Standards.

END OF SECTION 77-3
77-4 WATER UTILITY DISTRIBUTION VALVES
77-4-1 PART 1 GENERAL

1.01 REFERENCES
A. The following is a list of standards which may be referenced in this section:

1. American Water Works Association (AWWA):
a. C500, Metal-Seated Gate Valves for Water Supply Service. b. C504, Rubber-Seated Butterfly Valves.
c. C509, Resilient-Seated Gate Valves for Water Supply Service. d. C515, Reduced-Wall Resilient-Seated Gate Valves for Water Supply Service. e. C550, Protective Interior Coatings for Valves and Hydrants.

2. NSF International (NSF):
a. NSF/ANSI 61, Drinking Water System Components—Health Effects. b. NSF/ANSI 372, Drinking Water System Components—Lead Content.

1.02 SUBMITTALS
297
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 103
A. Action Submittals:

1. Shop Drawings:
a. Product data sheets for each make and model. Indicate valve type number b. Complete catalog information, descriptive literature, specifications, and identification of materials of construction.
c. Product data sheets for coating and lining products. d. Certification for compliance to NSF/ANSI 61 for valves used for drinking water service.

B. Informational Submittals:

1. Manufacturer’s Certificate of Compliance
a. Metal seated gate valves, full compliance with AWWA C500. b. Butterfly valves, full compliance with AWWA C504.
c. Resilient-seated gate valves, full compliance with AWWA C509. d. Reduced-wall, resilient-seated gate valves, full compliance with AWWA C515

2. Method for hydrostatic testing.

3. Tests and inspection results.

4. Operation and Maintenance Data

5. Manufacturer’s Certificate of Proper Installation

6. Required clear distance for proper operation of butterfly valve disc. 77-4-2 PART 2 MATERIALS

2.01 GENERAL
A. Valve same size as adjoining pipe, unless otherwise indicated.

B. Valve ends to suit adjacent piping.

C. Valves shall have no leakage (drip tight) in either direction at valve rated design pressure, unless otherwise allowed for in this section or in referenced valve standard.

D. Valve to open by turning counterclockwise, unless otherwise specified.

E. Valve materials in contact with or intended for drinking water service shall comply with requirements of NSF/ANSI 61 and other applicable federal, state, and local requirements.

F. Components and Materials in Contact with Water for Human Consumption: Comply with the requirements of the Safe Drinking Water Act and other applicable federal, state, and local requirements. Provide certification by manufacturer or an accredited certification organization recognized by the Authority Having Jurisdiction that components and materials comply with the maximum lead content standard in accordance with NSF/ANSI 61 and NSF/ANSI 372.

1. Use or reuse of components and materials without a traceable certification is prohibited.

2.02 GATE VALVES
A. General:

1. AWWA gate valves to be in compliance with referenced AWWA standard.

2. Provide 2 inch operating nut for buried valves

3. Provide totally enclosed spur or bevel gear operator with indicator for AWWA gate valves 14 inches and larger.
298
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 104

4. Mark AWWA gate valves with manufacturer’s name or mark, year of valve casting, valve size, and working water pressure.

5. Repaired AWWA gate valves will not be allowed.

B. Metal-Seated Gate Valve 3 Inches to 48 Inches:

1. AWWA C500, iron body, bronze mounted, ends as shown on Drawings], double-disc gate, non-rising bronze stem.

2. Working Water Pressure:
a. 3 Inches through 12 Inches: 200 psi.
b. 14 Inches through 48 Inches: 150 psi.

3. Manufacturers and Products:
a. M&H Valve Company; Style 67.
b. Clow Valve Company; AWWA C500.

C. Resilient-Seated Ductile Iron Gate Valve 3 Inches to 36 Inches:

1. Ductile-iron body, resilient seat, bronze stem and stem nut, ends as shown on Drawings, nonrising stem, full port in accordance with AWWA C509.

2. Minimum Design Working Water Pressure: 200250 psig.

3. Manufacturers:
a. M&H Valve; AWWA C509.
b. U.S. Pipe.

D. Reduced-Wall, Resilient-Seated Gate Valve 3 Inches to 36 Inches:

1. Ductile-iron body, resilient seat, bronze stem and stem nut, flanged ends as shown on Drawings, non-rising stem, full port in accordance with AWWA C515 and NSF 61 certified.

2. Minimum Design Working Water Pressure: 200 psig.

3. Manufacturers and Products:
a. American Flow Control; Series 2500.
b. M&H; Style 7000 and C515 Large RW Valves.

E. Factory Finishing of Gate Valve:

1. In accordance with Section 91 Paint.

2. Lining and Coating:
a. Interior Lining:
1) Manufacturer’s standard.
2) In accordance with AWWA C550.
3) Formulated from materials deemed acceptable to NSF/ANSI 61. b. Exterior Coating:
1) If valve and operator will not be subsequently field-coated, factory-applied coating shall be either two-part liquid material or heat-activated (fusion) material. 2) In accordance with AWWA C550.
3) Dry Film Thickness: Minimum 10 mils.
77-4-3 PART 3 CONSTRUCTION

3.01 INSTALLATION
299
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 105
A. Mount buried valves such that operating nut is accessible and operable from above.

B. Install in accordance with manufacturer’s written instructions.

3.02 DISINFECTION
A. Valves used for potable water service shall be disinfected in accordance with AWWA Standards.

3.03 FUNCTIONAL AND HYDROSTATIC TESTING
A. Functional Test:

1. Test that valves open and close smoothly under operating pressure conditions.

2. Test that two-way valves open and close smoothly under operating pressure conditions from both directions.

3. Count and record number of turns to open and close valve; account for discrepancies with manufacturer’s data.

B. Hydrostatic Testing:

1. Valve may be tested while testing pipeline or as a separate step after pipeline has been tested.

2. Apply test pressure to one side of valve and measure the pressure on the opposite side to determine if there is an increase in pressure caused by leakage. Then apply test pressure to the other side, and measure the pressure on the opposite side.

END OF SECTION 77-4
77-5 WATER UTILITY DISTRIBUTION FIRE HYDRANTS
77-5-1 PART 1 GENERAL

1.01 REFERENCES
A. The following is a list of standards which may be referenced in this section:

1. American Water Works Association (AWWA):
a. C502, Dry-Barrel Fire Hydrants.
b. C503, Wet Barrel Fire Hydrants.
c. C600, Installation of Ductile-Iron Mains and Their Appurtenances.

2. ASTM International (ASTM): C94, Standard Specification for Ready-Mixed Concrete.

3. FM Global Approved.

4. NSF International (NSF):
a. NSF/ANSI 61, Drinking Water System Components - Health Effects. b. NSF/ANSI 372, Drinking Water System Components - Lead Content.

5. Underwriters Laboratories, Inc. (UL): 246, Standard for Hydrants for Fire-Protection Service.

1.02 SUBMITTALS
A. Action Submittals: Catalog cuts of system components.

1. Include calculations for thrust blocks for high-pressure installations (if required).

B. Informational Submittal:
300
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 106

1. Certificate of Compliance: Upon completion of the system installation, verify all fire department hose connections, and check all fire safety devices to ensure their readiness for emergency connection and operation.
77-5-2 PART 2 MATERIALS

2.01 GENERAL
A. Components and Materials in Contact with Water for Human Consumption: Comply with the requirements of the Safe Drinking Water Act and other applicable federal, state, and local requirements. Provide certification by manufacturer or an accredited certification organization recognized by the Authority Having Jurisdiction that components and materials comply with the maximum lead content standard in accordance with NSF/ANSI 61 and NSF/ANSI 372.

1. Use or reuse of components and materials without a traceable certification is prohibited.

2.02 LOW PRESSURE HYDRANTS
A. Hydrant:

1. Break flangetype.

2. Nominal 4 1/2 inch main valve opening with 6 inch bottom connections.

3. Conform to AWWA C503.

4. Two 2 1/2 inch hose nozzles.

5. One 4 1/2 inch pumper nozzle.

6. Operating Nuts: 1 1/2 inch National Standard pentagon nut.

7. Mechanical jointinlet connection.

8. Yellow aboveground line.

9. Manufacturers and Product:
a. Clow Valve Co.

B. Main Valve:

1. Depth of Bury: 3 feet.

2. Equip with O ring seals.

3. Valve opens on counterclockwise rotation.

2.03 PRECAST CONCRETE PIER BLOCK
A. Nominal dimensions of 8 inch thickness by 16 inch square base.

B. Compressive Strength: 3,000 psi at 28 days.

2.04 GRAVEL FOR DRAINAGE
A. Washed 3/4 inch crushed rock or graded river gravel. Free of organic matter, sand, loam, clay, and other small particles that will restrict water flow through gravel.

2.05 FOUNDATION STABILIZATION MATERIAL
A. Furnish when existing trench material or imported pipe base material will not support soft or flooded spots in excavated trench.

B. Maximum 3 inch hard rock free from excessive clay material, but enough fines to bind larger fragments.

2.06 CONCRETE FOR THRUST BLOCKING
A. Ready mix meeting ASTM C94, Alternative 2.
301
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 107
B. Compressive Strength: 2,500 psi at 28 days.

C. Aggregate Size: 1 1/2 inches.

D. Slump: 2 inches to 4 inches.

2.07 THRUST TIES
A. 3/4 inch-diameter steel rods.

B. Duc-Lugs Manufacturer: Romac.
77-5-3 PART 3 CONSTRUCTION

3.01 GENERAL
A. Install hydrants in accordance with Section 3.7 and Section 3.8 of AWWA C600, unless specified otherwise.

3.02 EXCAVATION
A. Excavate to subgrade. Fill over excavated areas with foundation stabilization material. Tamp to provide firm foundation.

3.03 BASE BLOCK
A. Place on firm, level subgrade to ensure uniform support.

3.04 INSTALLATION OF HYDRANTS
A. Locate hydrants to provide accessibility and to minimize potential damage from vehicles.

1. Relocate improperly set hydrants.

2. Hydrant Located behind Curbs: Set barrel so pumper nozzle or hose nozzle caps are a minimum of 18 inches from gutter face of curb.

3. Hydrant Located in Space between Curb and Sidewalk: Not less than 6 inches, clear from sidewalks.

4. Hydrant Located between Sidewalk and Property Line: Minimum clearance8 inches from sidewalk.

5. Set hydrants so safety flange is a minimum of 2 inches above finished ground or sidewalk level.

B. Place hydrant on base block carefully to prevent the base block from breaking.

C. Joints shall conform to Section 3.4 of AWWA C600 when cast or ductile iron pipe is used.

D. Maintain hydrant in a plumb position during subsequent Work.

3.05 GRAVEL FOR DRAINAGE
A. Place gravel around base block and hydrant bottom in accordance with Section 3.7 of AWWA C600.

3.06 CONCRETE THRUST BLOCKING
A. Place blocking after hydrant is set in final position and join to pipe.

B. Concrete thrust block shall have a minimum of 4 square feet of bearing area against undisturbed earth for a standard pressure installation.

1. Calculate required bearing area for high pressure installation.

3.07 THRUST TIES
A. Install thrust ties in lieu of concrete thrust blocking when ground surface behind hydrant is less than 2 feet above top of hydrant base.
302
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 108

1. Install two tie rods between main valve and hydrant, water main tee and main valve.

2. Install mechanical joint glands with lugs in joints between hydrant, main valve and main line tee.

END OF SECTION 77-5
77-6 DISINFECTION OF WATER UTILITY DISTRIBUTION FACILITIES 77-6-1 PART 1 GENERAL

1.01 REFERENCES
A. The following is a list of standards which may be referenced in this section:

1. American Water Works Association (AWWA):
a. B300, Hypochlorites.
b. B301, Liquid Chlorine.
c. C651, Disinfecting Water Mains.
d. C652, Disinfection of Water Storage Facilities.
e. C653, Disinfection of Water Treatment Plants.
f. C655, Field Dechlorination.

2. Standard Methods for the Examination of Water and Wastewater, as published by American Public Health Association, American Water Works Association, and the Water Environment Federation.

1.02 SUBMITTALS
A. Informational Submittals:

1. Plan describing and illustrating conformance to appropriate AWWA standards and this specification.

2. Procedure and plan for cleaning system.

3. Procedures and plans for disinfection and testing.

4. Proposed locations within system where Samples will be taken.

5. Type of disinfecting solution and method of preparation.

6. Method of disposal for highly chlorinated disinfecting water.

7. Independent Testing Agency: Certification that testing agency is qualified to perform chlorine concentration testing and bacteriological testing] in accordance with AWWA standards, agency requirements, and this specification.

8. Certified Bacteriological Test Results:
a. Facility tested is free from coliform bacteria contamination. b. Forward results directly to Owner.

B. Independent Testing Agency: Certified in the State of California , with 10 years’ experience in field of water sampling and testing. Agency shall use calibrated testing instruments and equipment and documented standard procedures for performing specified testing.]

1.03 SEQUENCING
A. Commence disinfection after completion of following:

1. Completion and acceptance of internal painting of system(s).

2. Hydrostatic and pneumatic testing, pressure testing, functional and performance testing and acceptance of pipelines, pumping systems, structures, and equipment.

3. Disinfection of:
a. Pumps and associated system piping.
b. Treatment plant basins and processes used to supply water to system. 303
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 109
77-6-2 PART 2 MATERIALS

2.01 WATER FOR DISINFECTION AND TESTING
A. Clean, uncontaminated, and potable.

B. Convey Owner-supplied potable water in disinfected pipelines or containers.

2.02 DISINFECTANT
A. Provide disinfectant product conforming to AWWA standards. 77-6-3 PART 3 CONSTRUCTION

3.01 GENERAL
A. Conform to AWWA C651 for pipes and pipelinesexcept as modified in these Specifications.

B. Contractor’s Equipment:

1. Furnish chemicals and equipment, such as pumps and hoses, to accomplish disinfection.

2. Water used to fill pipeline may be supplied using a temporary connection to existing distribution system. Provide protection against cross-connections as required by AWWA C651.

C. Disinfect the following items installed or modified under this Project, intended to hold, transport, or otherwise contact potable water:

1. Pipelines: Disinfect new pipelines that connect to existing pipelines up to point of connection.

2. Disinfect surfaces of materials that will contact finished water, both during and following construction, using one of the methods described in AWWA C652 and AWWA C653. Disinfect prior to contact with finished water. Take care to avoid recontamination following disinfection.

D. Prior to application of disinfectants, clean pipelines of loose and suspended material.

E. Allow freshwater and disinfectant solution to flow into pipe or vessel at a measured rate so chlorinewater solution is at specified strength. Do not place concentrated liquid commercial disinfectant in pipeline or other facilities to be disinfected before it is filled with water.

3.02 TURBIDITY
A. Cleaning of equipment and facilities shall include removal of materials that result in a turbidity exceeding limits stated in Article Testing.

3.03 PIPING
A. Cleaning:

1. Before disinfecting, clean foreign matter from pipe in accordance with AWWA C651.

2. If continuous feed method or slug method of disinfection, as described in AWWA C651, are used, flush pipelines with potable water at a velocity as described in AWWA C651 until clear of suspended solids and color.

Provide hoses, temporary pipes, ditches, and other conduits as needed to dispose of flushing water without damage to adjacent properties.

3. Flush service connections and hydrants. Flush distribution lines prior to flushing hydrants and service connections. Operate valves during flushing process at least twice during each flush.

B. Disinfecting Procedure: In accordance with AWWA C651, unless herein modified.

3.04 DISPOSAL OF CHLORINATED WATER
A. Do not allow flow into a waterway without neutralizing disinfectant residual.

B. Dechlorination Procedure: In accordance with AWWA C655, unless herein modified.

3.05 TESTING
A. Collection of Samples:

1. Coordinate activities to allow Samples to be taken in accordance with this specification.

2. Provide valves at sampling points.
304
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 110

3. Provide access to sampling points.

B. Chlorine Concentration Sampling and Analysis:

1. Collect and analyze Samples in accordance with AWWA 651 C. After facilities or piping have been cleaned, disinfected, and refilled with potable water, an independent laboratory will take water Samples and have them analyzed for conformance to bacterial limitations for public drinking water supplies.

1. Collect Samples in accordance with applicable AWWA Standard.

2. Analyze Samples for coliform concentrations in accordance with latest edition of Standard Methods for the Examination of Water and Wastewater.

D. If minimum Samples required above are bacterially positive, disinfecting procedures and bacteriological testing shall be repeated until bacterial limits are met.

END OF SECTION 77-6
Section 78 Incidental Construction
Refer to Section 78, “Incidental Construction” of the Standard Specifications.

78.A Adjust Monument Cover to Grade and Remove and Replace Monument Attention is directed to Section 78-2 “Survey Monuments” of the Standard Specifications.

Replace the 2nd paragraph of Section 78-2.01 with:

Notify the Engineer at least 7 days before you construct a survey monument, adjust a monument cover to grade or remove and replace a monument.

Add Section 78-2:
78-2.01A Remove and Replace Monument
Contractor shall review section 8771 and section 8725 of the business and professions code and section 605 of the California Penal Code to ensure that monument conservation has been properly addressed. Any monuments to be disturbed as a result of construction activities will require preconstruction and post construction Corner Records or a Record of Survey performed by a Licensed Surveyor.

The contractor is responsible for perpetuating, preserving, and re-establishing all survey monumentation.

Prior to construction, all monuments shall be located and referenced by or under the direction of a licensed land surveyor.

Remove and Replace monuments shown. Visually confirm the locations shown prior to construction. Request and collect corner records from the Engineer or Butte County. If no corner records are available, set reference points and file a corner record with Butte County prior to construction. Following construction and monument replacement, file a post-construction corner record with Butte County. Provide all records to the Engineer.

Delete the 2nd, 3rd and 4th paragraphs of Section 78-2.02 and add:

If the moment is located where it is subject to vehicular traffic, replaced monuments must conform to Town of Paradise Standard D-7A. If the monument is located in the curb, gutter or sidewalk, replaced monuments must conform to Town of Paradise Standard D-7B.

Add to Section 78-2.03:
305
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 111
Comply with Section 78-23 “Adjust Utility Frames, Covers, and Manholes” for adjusting monument covers to grade.

78.B Adjust Access Box Frame and Cover (Utility), Adjust Manhole Frame and Cover (Utility), Lower and Raise Frame and Cover (Utility)
Attention is directed to Section 78-23 “Adjust Utility Frames, Covers, and Manholes” of the Revised Standard Specifications.

Adjust Access Box Frame and Cover (Utility) to include Paradise Irrigation District Water Meters, Pacific Gas and Electric pull boxes and vaults. Payment for this item to include all work and material to complete this work.

Adjust Manhole Frame and Cover (Utility) to include AT&T Manholes and Town of Paradise Storm Drain Manholes. Payment for this item to include all work and material to complete this work.

Lower and Raise Frame and Cover (Utility) to include Paradise Irrigation District water valves. Payment for this item to include all work and material to complete this work, including purchase and installation of new boxes and lids. Boxes and lids in good condition shall be salvaged in accordance with the provisions in Section 15-1.03C “Salvaging Facilities” of the Standard Specifications.

Section 81 Miscellaneous Traffic Control Devices
Refer to Section 81, “Miscellaneous Traffic Control Devices” of the Standard Specifications.

81.A Delineator (Class 1)
Attention is directed to Section 81-2 “Delineators” of the Standard Specifications.

81.B 81.B Retroreflective Pavement Markers (Recessed)
Attention is directed to Section 81‐3.02C “Retroreflective Pavement Markers” of the Standard Specifications.

Add to Section 81-3.03D:

Two-way blue retroreflective pavement markers shall be recessed and placed 6-inches from the centerline stripe, or 6-inches from the approximate center of pavement where there is no centerline stripe, on the side nearest to the fire hydrant at locations determined by the Engineer.

Section 84 Markings
Refer to Section 84, “Markings” of the Standard Specifications.

84.A Thermoplastic Stripes and Pavement Marking
Attention is directed to Section 84-2 “Traffic Stripes and Pavement Markings” of the Standard Specifications.

Replace Section 84-2.02B with:
184.D Materials
Thermoplastic material shall be free of lead and chromium and shall conform to the requirements in State Specification PTH 02ALKYD.

Retroreflectivity of the thermoplastic pavement traffic stripes and markings shall conform to the requirements in ASTM Designation: D7585 (2015). White thermoplastic traffic stripes and pavement markings shall have a minimum initial retroreflectivity of 250 mcd m 2 lx 1. Yellow thermoplastic traffic stripes pavement markings shall have a minimum initial retroreflectivity of 150 mcd m 2 lx 1. 306
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 112
Replace the 2nd paragraph of section 84‐2.03B(2)(b) the RSS for section 84‐2 with:

Apply extruded thermoplastic for traffic stripes in a single pass. The applied thermoplastic must be at least 0.08‐ inch thick.
284.D Construction
Contractor is responsible for establishing the pavement delineation, including traffic stripes, traffic markers, and markings. The Contractor shall allow at least 24-hours for Engineer approval of layout, prior to beginning application of thermoplastic stripes and markings.

Minimum Marking Thickness = 0.120-inch

84.B Paint Traffic Stripe (2-Coat)
Attention is directed to Section 84-2 “Paint” of the Standard Specifications. 307
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Page 113

APPENDIX

TO THE SPECIAL PROVISIONS
The following contents of the Appendix are included as part of the Special Provisions:

APPENDIX # DESCRIPTION

A CEQA CE
308
Camp Fire Hydrant Repair Project Town of Paradise
Contract No. 8404 CON Bid Forms

Page 1 ends
← All documents from this meeting