7.4.1 Mitigation Strategies
01 Title: Support and Expand Countywide Vegetation Management and Fire Prevention Efforts
Source: Los Angeles County Fire Department
Type: Natural Systems Protection
Description: Conduct passive protection measures such as creating defensible space buffers around residential and non-residential structures through the removal of
flammable vegetation, managing and/or reducing
hazardous fuels, creating firebreaks, fire-resistive
landscaping and construction, and clearing dead
vegetation, among others. Engage indigenous
communities to inform vegetation management and fire
prevention practices aligned with Traditional Ecological Knowledge (TEK).
Hazard: Wildfire
Hazard: Severe
Wind/Tornado
02 Title: Enhance Community Engagement in Wildfire Protection and Prevention
Source: Los Angeles County Department of Regional Planning Type: Education and Awareness Programs
Description: Engage residents and businesses in high fire risk communities to educate them on community-focused
mitigation and risk reduction strategies, emergency
preparedness and evacuation readiness, and opportunities to get involved in fire safety-related community initiatives.
Engage indigenous communities to inform protection and
prevention practices aligned with Traditional Ecological Knowledge (TEK).
Hazard: Wildfire
Hazard: Severe
Wind/Tornado
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
03 Title: Perform Post-Fire Flooding, Debris Flow, and Mud Flow Risk Assessments and Mitigation Activities
Source: Los Angeles County Department of Public Works
Type: Structure and Infrastructure Projects
Description: Following a wildfire, assess burn scar for significant mud and debris flow risks to produce mud and debris flow phase maps for first responding agencies to prepare for potential evacuations. Recommend mitigation strategies to prevent mud and debris flow impacts.
Hazard: Wildfire
Hazard: Flooding
04 Title: Strengthen Operational Continuity Capabilities for Critical Facilities Source: Los Angeles County Department Public Health, among others.
Type: Structure and Infrastructure Projects
Description: Conduct robust continuity planning to ensure the continued performance of essential functions in the event critical facilities are impacted by various hazards.
Build capabilities that support operational continuity such as alternate or uninterrupted power supply, workforce
development and cross-training, emergency
communications, and data backup or failover hardware.
Hazard: Wildfire
Hazard: Extreme Heat
Hazard: Severe
Wind/Tornado
DRAFT
Hazard: Cyber Incidents
County of Los Angeles
All-Hazards Mitigation Plan
05 Title: Incorporate Hazards in Local Planning, Land Use, and Development Codes
Source: Los Angeles County Department of Public Works and Regional Planning Type: Local Planning and Regulations
Description: Develop, maintain, and leverage
opportunities to strengthen relevant ordinances that
govern land use, building codes, and development in
high-risk hazard areas. Incorporate mitigation actions in community planning such as Community Wildfire Plans,
Flood Management Plans, and the County General Plan,
among many others.
Hazard: Wildfire
Hazard: Earthquake
Hazard: Land Movement
Hazard: Severe
Wind/Tornado
Hazard: Flooding
06 Title: Increase Public Awareness of Climate Change Effects on Local Hazards
Source: Los Angeles County Chief Sustainability Office
Type: Education and Awareness Programs
Description: Engage with communities on ways climate
change impacts various natural hazards along with
mitigation actions and available resources for climate
adaptation and resilience. Efforts should focus on how
communities can take action or support existing County
programs including funding available to the public. Public engagement efforts should be accessible, ensure people
with Access and Functional Needs are included in
outreach, and use materials with multiple language
options.
Hazard: Wildfire
Hazard: Extreme Heat
Hazard: Drought
Hazard: Land Movement
Hazard: Severe
Wind/Tornado
Hazard: Flooding
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
07 Title: Expand Stormwater Management, Drainage, and Outlet Planning Source: Los Angeles County Department of Public Works
Type: Local Planning and Regulations
Description: Continue robust stormwater management
programs. Conduct studies to inform measures to improve outlet and drainage planning and prevent flood damage
to communities in high-risk areas. These efforts should also prevent flood damage to County-maintained roadways,
including evacuation egress and emergency services
ingress, while supporting potential groundwater recharge.
Hazard: Flooding
Hazard: Drought
Hazard: Transportation
Incident
08 Title: Construct and Maintain Localized Flood Control Improvements Source: Los Angeles County Department of Public Works
Type: Structural and Infrastructure Projects
Description: Maintain existing flood control mechanisms by drainage system maintenance, sediment and debris
clearance, and other actions. Leverage opportunities to construct flood control improvements.
Hazard: Flooding
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
09 Title: Preserve Floodplains as Public Use Open Spaces Source: Los Angeles County Department of Public Works, among others.
Type: Natural Systems Protections
Description: Preserve and expand public use open spaces that capture stormwater with the aim of reducing localized flooding while also providing green space and
recreational opportunities to communities. Prioritize
floodplains and watersheds in County-owned public use
open spaces near flood risk areas. Use stormwater best
management practices in projects involving open spaces
to support natural water collection and conservation.
Incorporate floodplain preservation into future park
improvements.
Hazard: Flooding
10 Title: Harden Critical Facilities and Infrastructure from Seismic Damage Source: Los Angeles County Department of Public Works
Type: Structure and Infrastructure Projects
Description: Conduct seismic assessments to prioritize
retrofitting and other seismic mitigation actions such as bracing or seismic shutoff valves. Efforts should focus on critical facilities for community lifelines such as hospitals, public safety facilities, utility sites, high-hazard potential dams, and transportation assets (i.e., bridges, roadways, airports, and others).
Hazard: Earthquake
Hazard: Land Movement
Hazard: Dam Failure
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
11 Title: Prevent Impacts to the Transportation System
Source: Los Angeles County Department of Public Works
Type: Structure and Infrastructure Projects
Description: Hazard impacts to the transportation system in Los Angeles County have far-reaching potential for
cascading effects across multiple lifelines. Mitigation activities for multiple hazards should focus on preventing or lessening impacts to transportation. Activities may
include stabilization efforts along County-maintained
roads, reinforcing transportation assets, or other seismic mitigation actions.
Hazard: Earthquake
Hazard: Land Movement
Hazard: Transportation
Incident
12 Title: Continue Efforts to Enhance Dam Safety and Reduce Long-Term Vulnerabilities with High Hazard Potential Dams
Source: Los Angeles County Department of Public Works
Type: Structure and Infrastructure Projects
Description: Upgrade infrastructure to ensure the longterm integrity and safe operation of County-owned dam facilities. Potential actions could include strengthening of dams, sediment management activities, regular
inspections, continuous maintenance, integrating
advanced technologies, and emergency preparedness
efforts.
Hazard: Earthquake
DRAFT
Hazard: Dam Failure
County of Los Angeles
All-Hazards Mitigation Plan
13 Title: Assess Water Resilience in Los Angeles County Source: Los Angeles County Department of Public Works
Type: Local Planning and Regulations
Description: Conduct assessments and studies to monitor the water supply and develop recommendations for other
water systems. Identify potential secondary water sources or other contingency measures for ensuring water system resilience during drought conditions.
Hazard: Drought
14 Title: Expand Drought-Tolerant Landscaping and Design Source: Los Angeles County Chief Sustainability Office and Department of Regional Planning
Type: Natural Systems Protection
Description: Integrate drought mitigation into landscaping and design measures undertaken by the County. Prioritize native and drought-tolerant plants when selecting
landscaping designs. Use permeable materials for pavers, driveways, walkways, and roadways to reduce runoff and
promote groundwater recharge that incorporate
indigenous- informed practices aligned with Traditional Ecological Knowledge (TEK).
Hazard: Drought
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
15 Title: Address Urban Heat Islands by Investing in Green Infrastructure and Cooling Strategies
Source: Los Angeles County Chief Sustainability Office, Department of Regional Planning, Department of Economic Opportunity, Department of Public Health, and Department of Public Works, among others.
Type: Local Planning and Regulations
Description: Increase shade cover provided by vegetation such as planting native and drought-tolerant trees along with smaller plants such as shrubs, grasses, and
groundcover. Increase the tree canopy in County parks
and open concrete or asphalt spaces in the public right of way or County-owned parking lots. Conduct assessments
to identify communities considered urban heat islands that are at highest need for an increase in tree canopy or other heat mitigation activities. Advance cooling strategies such as constructing shade structures, installing splash pads, operating cooling centers, modernizing air conditioning systems, and expanding the availability of cool roofing infrastructure that reflects heat away from buildings.
Ensure mitigation actions address heat impacts faced by people with Access and Functional Needs. Many of these
actions have a secondary benefit mitigating the effects of climate change by promoting carbon sequestration, the
capture and storage of CO2 from the atmosphere.
Additionally, increasing green space and shade cover in urban areas can advance environmental justice.
Hazard: Extreme Heat
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
16 Title: Increase Coastal Resilience, Prevent Erosion, and Protect Shorelines Source: Los Angeles County Chief Sustainability Office and Department of Beaches and Harbors
Type: Natural Systems Protection
Description: Conduct activities to replace sediment lost due to erosion or coastal storms. Assess the need for other sediment protection measures such as planting certain
types of vegetation. Consider activities that prevent wind from blowing sand off beaches and impacts from storm
surge in high-risk areas. These actions help protect coastal roadways and other infrastructure along with ensuring
recreation opportunities remain for residents and visitors.
Hazard: Flooding
Hazard: Tsunami
17 Title: Conduct Multi-Discipline Training and Exercise Programs Source: Los Angeles County Sheriff’s Department and Office of Emergency Management
Type: Education and Awareness Programs
Description: Identify opportunities for joint training and exercises for mass violence and cyber incident response across disciplines of law enforcement, fire and emergency medical services, medical examiner, private sector, and others. Each training and exercise should include mass
violence rescue and evacuation techniques for AFN
populations.
Hazard: Mass Violence
Hazard: Cyber Incidents
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
18 Title: Strengthen Partnerships and Coordination Among Local Agencies Source: Los Angeles County Sheriff’s Department and Office of Emergency Management
Type: Education and Awareness Programs
Description: Expand collaborative agreements with other agencies to share resources during large-scale
emergencies. Strengthen partnerships with local agencies for resource sharing. Enhance response capabilities
during major incidents.
Hazard: Mass Violence
Hazard: Cyber Incidents
19 Title: Incorporate Mass Violence Prevention and Mitigation Efforts into Special Event Planning
Source: Los Angeles County Sheriff’s Department and Office of Emergency Management
Type: Education and Awareness Programs
Description: Use physical security measures such as
bollards, water-filled barricades, vehicle barriers, and others. Identify mitigation measures for upcoming special events such as the World Cup, Super Bowl, and Olympics.
Conduct special event training on topics such as crowd
management, sporting event safety, and stadium
evacuation. Incorporate Family Assistance Center
readiness into special event planning.
DRAFT
Hazard: Mass Violence
County of Los Angeles
All-Hazards Mitigation Plan
20 Title: Extreme Heat Risk Education and Safety Outreach for Residents and Vulnerable Workers
Source: Los Angeles County Chief Sustainability Office, Department of Economic Opportunity, Department of Public Health, and Department of Public Works Type: Education and Awareness Programs
Description: Implement outreach and education to
workers in low-wage and high hazard industries in LA
County that are disproportionately impacted by extreme
heat. Partner with organizations providing services to
people with Access and Functional Needs on heat
response strategies. Expand awareness of cooling centers and other heat respite options for unhoused populations.
Increase workforce development opportunities to expand
the availability of green infrastructure.
Hazard: Extreme Heat
21 Title: Increase Field Response and Coordination Capabilities Source: Los Angeles County Sheriff’s Department and Office of Emergency Management
Type: Education and Awareness Programs
Description: Enhance field coordination capabilities at large-scale planned events and no-notice incidents such as wildfires, mass violence, and others. Potential actions could include investments in new redundant
communications systems, response vehicles, alert and
warning capabilities, and other field operations
equipment.
Hazard: Wildfire
Hazard: Mass Violence
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
22 Title: Strengthen Public Health Prevention and Preparedness Measures Source: Los Angeles County Office of Emergency Management, Department of Public Health, Department of Health Services, and Fire Department Type: Education and Awareness Programs
Description: Continue and expand mass vaccination and
immunization efforts. Coordinate healthcare surge
preparedness and response efforts. Conduct disease
surveillance, monitor early warning systems, and
coordinate outbreak response. Educate communities and
businesses about health implications related to wildfire recovery and hazardous materials. Liaise with health
system partners to understand hospital surge capacity
within the County. Maintain and deploy emergency
stockpiles. Incorporate potential climate change-related infectious disease implications into public health
preparedness planning.
Hazard: Public Health
Emergencies
7.5 Status of Previous Mitigation Efforts
Table 7-6 below shows the status of mitigation strategies described in the 2020 AHMP.
Departments have made significant progress on some of these mitigation strategies, partially but not fully completing some of these efforts. As such, each strategy from the 2020 AHMP have been rolled into the mitigation strategies described in this section.
Table 7-6 Status of Mitigation Efforts
2020 AHMP Strategy Status 2025 AHMP Strategy
Red Flag Warning Public
Outreach
Not
Completed/
Ongoing
Enhance Community Engagement
in Wildfire Protection and
Prevention
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
2020 AHMP Strategy Status 2025 AHMP Strategy
Vegetation Management
Program
Not
Completed/
Ongoing
Support and Expand Countywide
Vegetation Management and Fire
Prevention Efforts
Fireproof Coating of Critical
Facilities
Not
Completed/
Ongoing
Enhance Community Engagement
in Wildfire Protection and
Prevention
Auxiliary Power for Critical
Facilities
Not
Completed/
Ongoing
Strengthen Operational Continuity
Capabilities for Critical Facilities
Earthquake-Resistant Ductile
Iron Pipes Replacement
Not
Completed/
Ongoing
Harden Critical Facilities and
Infrastructure from Seismic
Damage
Watershed Ecosystem
Restoration
Not
Completed/
Ongoing
Preserve Floodplains as Public Use
Open Spaces
Green Streets / Living Streets Not
Completed/
Ongoing
Expand Drought-Tolerant
Landscaping and Design
Coordinated Data Collection
and Database Systems
Not
Completed/
Ongoing
Strengthen Partnerships and
Resource Coordination Among
Local Agencies
Brush Clearance Program Not
Completed/
Ongoing
Support and Expand Countywide
Vegetation Management and Fire
Prevention Efforts
Wildland Urban-Interface
Ordinance
Not
Completed/
Ongoing
Incorporate Hazards in Local
Planning, Land Use, and
Development Codes
Urban Forest Management
Plan
Not
Completed/
Ongoing
Address Urban Heat Islands by
Investing in Green Infrastructure
and Cooling Strategies
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
2020 AHMP Strategy Status 2025 AHMP Strategy
Community Wildfire Protection
Plans
Not
Completed/
Ongoing
Incorporate Hazards in Local
Planning, Land Use, and
Development Codes
Pre-Disaster Professional
Support
Not
Completed/
Ongoing
Strengthen Operational Continuity
Capabilities for Critical Facilities
Fuel Trailer Project Not
Completed/
Ongoing
Strengthen Operational Continuity
Capabilities for Critical Facilities
7.6 Prioritization and Implementation of Mitigation Actions Potential mitigation actions were prioritized using the FEMA National Risk Index (NRI) score and information from the 2024 Los Angeles Threat and Hazard Identification and Risk Assessment (THIRA), which both address hazards by frequency, severity, and impact. Both the NRI and THIRA follow established processes and use a standardized risk assessment methodology. The NRI incorporates multiple variables including physical impacts posed by hazards in addition to social vulnerability data that communicates risks specific to a certain community. Table 7-7 provides an overview of the NRI results for Los Angeles County across 18 hazards. Hazards rated as Relatively Low, Not Applicable, or No Rating were not included in this AHMP as they are uncommon in frequency in Los Angeles County; all other hazards are covered in this plan.
Table 7-7 FEMA National Risk Index Hazards
Hazard NRI Score
(out of 100.0)
Score Description Covered in
Plan?
Earthquake 100.0 Very High Yes | Section 6.3
Wildfire 99.9 Very High Yes | Section 6.2
Extreme Heat 98.4 Relatively High Yes | Section 6.4
Tornado 97.6 Relatively High Yes | Section 6.10
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
Hazard NRI Score
(out of 100.0)
Score Description Covered in
Plan?
Landslide 96.3 Relatively High Yes | Section 6.8
Lightning 95.0 Relatively High Yes | Section 6.2/
6.6 Riverine Flooding 90.8 Relatively Moderate Yes | Section 6.6 Drought 73.8 Relatively Moderate Yes | Section 6.5
Strong Wind 73.5 Relatively Moderate Yes | Section 6.10 Tsunami 63.5 Relatively Moderate Yes | Section 6.10
Winter Weather 48.6 Relatively Low Not Prioritized
Hail 48.1 Relatively Low Not Prioritized
Coastal Flooding 43.3 Very Low Not Prioritized
Avalanche 33.7 Very Low Not Prioritized
Cold Wave 0.0 No Rating Not Prioritized
Hurricane N/A Not Applicable Not Prioritized
Ice Storm N/A Not Applicable Not Prioritized
Volcanic Activity N/A Not Applicable Not Prioritized
The THIRA is a process that communities undertake to assess risk and set capability targets to focus their preparedness efforts and strengthen response and recovery capabilities. There are three primary focuses of the THIRA: threat and hazard identification, impacts analyses that include the specific demographics of the community, and a description of existing response and recovery capabilities. The 2024 Los Angeles/Long Beach THIRA was reviewed as part of this hazard mitigation planning effort and all threats and hazards identified were included as part of this AHMP.
Additionally, the THIRA’s identification of several human-caused threats with potential to impact Los Angeles County influenced the decision to include such threats in this AHMP. Table 7-8 shows a crosswalk of the hazards and threats identified in the THIRA and their corresponding sections in this AHMP.
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
Table 7-8 2024 THIRA and 2025 AHMP Crosswalk
2024 THIRA
Hazard/Threat Name
2025 AHMP Hazard/Threat
Name
Covered in Plan?
Biological Attack Public Health Emergencies Yes | Section 6.14 Complex Coordinated
Terrorist Attack
Mass Violence Yes | Section 6.11
Cyber Attack Cyber Incident Yes | Section 6.12
Earthquake Earthquake Yes | Section 6.3
Flood Flooding Yes | Section 6.6
Pandemic – Human Public Health Emergencies Yes | Section 6.14 Radiological Attack Public Health Emergencies Yes | Section 6.14 Transportation Accident Transportation Incident Yes | Section 6.13 Wildfire Wildfire Yes | Section 6.2
Additional criteria used to prioritize potential mitigation actions also included the following components:
• Actions that prioritize equity and integrate vulnerable populations, including people with AFN.
• Potential benefits of the action to prevent a major hazard. • Actions that have social support to build a culture and practice of resilience. • Cost of the action versus the potential benefit to prevent a major hazard. • Availability of funding and actions that support grant requirements. • Political support to remedy or prevent a major health or safety hazard. • Actions that are technically, legally, environmentally, and economically feasible. • Actions that the County has the administrative capabilities to implement. • Actions that are related to mitigating long-term vulnerabilities to Countyowned High Hazard Potential Dams will automatically be given a HIGH priority.
7.6.1 Priority Levels
• High-Priority Mitigation Actions: are essential and require immediate attention to address critical risks and safeguard life, property, or essential systems.
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
• Medium-Priority Mitigation Actions: are important but less urgent, supporting overall risk reduction and resilience goals while allowing for planned implementation.
• Low-Priority Mitigation Actions: address lower-risk concerns or long-term objectives and can be deferred without immediate impact to safety or core functions.
7.6.2 Changes in Criteria
The 2014 Los Angeles County AHMP’s Mitigation Action Matrix was prioritized using the Social, Technical, Administrative, Political, Legal, Environmental, and Economic (STAPLEE) method, which FEMA had recommended as a prioritization procedure in the early to mid-2000s. The 2020 AHMP replaced the use of STAPLEE with a more streamlined prioritization process that included the following:
• To remedy or prevent a major health/safety hazard, a mitigation project must have political support.
• To build a culture and practice of disaster resilience, a mitigation project must have social support.
• To meet FEMA HMA grant criteria, a mitigation project must be technically, legally, environmentally, and economically feasible and the jurisdiction must have the administrative capabilities to implement it.
This prioritization method used in the 2020 AHMP has been adapted and incorporated into the prioritization criteria described previously in Section 7.6.
7.7 Integration with Other Plans
The County of Los Angeles ensures that mitigation is a countywide effort with multiple departments contributing to critical activities that reduce hazard risks. These actions are captured in other discipline-specific plans in addition to the AHMP, including those listed in Table 7-9.
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
Table 7-9 AHMP Integration with Other Plans
Plan Authored By Hazard(s) Covered
in Plan?
Comprehensive
Floodplain
Management Plan
Los Angeles County
Department of Public
Works
Flood Yes
Repetitive Loss Area
Analysis Report
Los Angeles County
Department of Public
Works
Flood Yes
Climate Action Plan Los Angeles County
Department of Regional
Planning
Wildfire
Extreme Heat
Flooding
Drought
Yes
Sustainability Plan Los Angeles County Chief
Sustainability Office
Wildfire
Extreme Heat
Flooding
Drought
Yes
County Fire Plan Los Angeles County Fire
Department
Wildfire Yes
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
7.8 Mitigation Action Plan
Table 7-10 represents a Mitigation Action Plan to reduce risks of the hazards identified in this AHMP. Notably, many County departments include discipline-specific mitigation actions within other related plans mentioned in the above section. Some actions that mitigate risk of natural hazards that are covered elsewhere may not be explicitly listed or may be referred to in general terms while specific details are available in other related plans.
Table 7-10 Mitigation Action Plan
Action
No.
Priority Hazard
Action Name
Potential
Funding
Source
Expected
Time
Frame
Lead
Agencies
01 HIGH
Wildfire Support and Expand Countywide
Vegetation Management and Fire
Prevention Efforts
HMGP Annual LACoFD, PW
Severe
Wind/Tornado
02 HIGH
Wildfire Enhance Community
Engagement in Wildfire
Protection and Prevention
HMGP Quarterly LACoFD, DRP,
OEM, LASD Severe
Wind/Tornado
03 HIGH
Wildfire Perform Post-Fire Flooding,
Debris Flow, and Mud Flow Risk
Assessments and Mitigation
Activities
HMGP, FMA Annual PW, LACoFD,
OEM
Flooding
04 HIGH
Wildfire UASI, SHSP Annual OEM, PW,
DPH, Extreme Heat
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
Action
No.
Priority Hazard
Action Name
Potential
Funding
Source
Expected
Time
Frame
Lead
Agencies
Severe
Wind/Tornado
Strengthen Operational
Continuity Capabilities for Critical
Facilities
LACoFD,
LASD, ISD
Cyber Incidents
05 HIGH
Wildfire
Incorporate Hazards in Local
Planning, Land Use, and
Development Codes
HMGP, FMA 1-3 Years DRP, PW
Earthquake
Land Movement
Severe
Wind/Tornado
Flooding
06 MEDIUM
Wildfire
Increase Public Awareness of
Climate Change Effects on Local
Hazards
FMA, Prop 4 Annual DRP, CSO,
CEO Extreme Heat
Drought
Land Movement
Severe
Wind/Tornado
Flooding
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
Action
No.
Priority Hazard
Action Name
Potential
Funding
Source
Expected
Time
Frame
Lead
Agencies
07 HIGH
Flooding Expand Stormwater
Management, Drainage, and
Outlet Planning
FMA 1-5 Years PW
Drought
Transportation
Incident
08 HIGH Flooding Construct and Maintain Localized
Flood Control Improvements
FMA 1-5 Years PW
09 MEDIUM Flooding Preserve Floodplains as Public
Use Open Spaces
FMA, Prop 4 1-5 Years PW, DRP, DPR
10 HIGH
Earthquake Harden Critical Facilities and
Infrastructure from Seismic
Damage
HMGP 1-5 Years PW, ISD
Land Movement
Dam Failure
11 MEDIUM
Earthquake Prevent Impacts to the
Transportation System
HMGP 1-5 Years PW, LASD
Land Movement
Transportation
Incident
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
Action
No.
Priority Hazard
Action Name
Potential
Funding
Source
Expected
Time
Frame
Lead
Agencies
12 HIGH
Earthquake Conduct Seismic Strengthening
at County-Owned Dams
FMA, HHPD 1-5 Years PW
Dam Failure
13 MEDIUM Drought Assess Water Resilience in Los
Angeles County
Prop 4 1-5 Years PW, DRP
14 MEDIUM Drought Expand Drought-Tolerant
Landscaping and Design
Prop 4 1-5 Years DPR, DRP,
PW, CSO
15 HIGH Extreme Heat
Address Urban Heat Islands by
Investing in Green Infrastructure
and Cooling Strategies
Prop 4 1-5 Years CSO, DRP,
DEO, DPH,
PW, DPR
16 HIGH
Flooding Increase Coastal Resilience,
Prevent Erosion, and Protect
Shorelines
FMA, Prop 4 1-5 Years CSO, DBH,
PW Tsunami
17 HIGH
Mass Violence Conduct Multi-Discipline Training
and Exercise Programs
UASI, SHSP 1-5 Years LASD, OEM,
LACoFD Cyber Incidents
18 MEDIUM
Mass Violence Strengthen Partnerships and
Resource Coordination Among
Local Agencies
UASI, SHSP 1-5 Years LASD, OEM,
LACoFD
Cyber Incidents
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
Action
No.
Priority Hazard
Action Name
Potential
Funding
Source
Expected
Time
Frame
Lead
Agencies
19 MEDIUM Mass Violence
Incorporate Mass Violence
Prevention and Mitigation Efforts
into Special Event Planning
UASI, SHSP 1-5 Years LASD, OEM,
LACoFD
20 HIGH Extreme Heat
Extreme Heat Risk Education and
Safety Outreach for Residents
and Vulnerable Workers
Prop 4 1-5 Years CSO, DEO,
DPH, PW,
DAD
21 HIGH
Public Health
Emergencies
Strengthen Robust Public Health
Prevention and Preparedness
Measures
UASI, SHSP,
PHEP, HPP
1-5 Years DPH, OEM,
DHS,
LACoFD
22 MEDIUM
Wildfire Increase Field Response and
Coordination Capabilities
UASI, SHSP 1-5 Years LASD, OEM,
LACoFD Mass Violence
Agency Key:
CEO = Los Angeles County Chief Executive Office
CSO = Los Angeles County Chief Sustainability Office
DAD=Los Angeles Department of Aging and Disabilities
DBH = Los Angeles County Department of Beaches and Harbors DEO = Los Angeles County Department of Economic Opportunity DHS = Los Angeles County Department of Health Services
DPH = Los Angeles County Department of Public Health
DPR = Los Angeles County Department of Parks and Recreation PW = Los Angeles County Public Works
DRP = Los Angeles County Department of Regional Planning ISD = Los Angeles County Internal Services Department
LACoFD = Los Angeles County Fire Department.
LASD = Los Angeles County Sheriff’s Department
OEM = Los Angeles County Chief Executive Office - Office of Emergency Management
Grant Program Key:
FMA = Flood Mitigation Assistance
HMGP = Hazard Mitigation Grant Program
HPP = Hospital Preparedness Program
PHEP = Public Health Emergency Preparedness
SHSP = State Homeland Security Program
UASI = Urban Area Security Initiative
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
8 Plan Maintenance
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
8.1 Community Participation in Plan Maintenance
The Hazard Mitigation Plan will be reviewed regularly, acknowledging the dynamic nature of hazard landscapes and the evolving understanding of risks. Stakeholders’ engagement will be prioritized throughout the development and monitoring process, fostering transparency and accountability.
To maintain transparency and community involvement, the County has outlined several measures for continued public participation:
• Public Access to Hazard Mitigation Documents: A copy of the 2025 AHMP will be maintained on the Los Angeles County Hazard Mitigation Program website along with contact information. Los Angeles County OEM will notify the public of any changes or updates, including mitigation projects identified in the plan as they are implemented, via social media, and traditional local media channels. • Annual Public Engagement Opportunities: Los Angeles County OEM will endeavor to hold multiple in-person public engagement opportunities for hazard mitigation to keep the public informed of progress on hazard mitigation projects, obtain ongoing public feedback, and educate the public about the County’s hazard mitigation efforts.
• Online Portal: A Los Angeles County Hazard Mitigation Program website will be established to provide the public with more information on hazard mitigation and project updates. This portal will serve as a mechanism to obtain continuous public feedback as projects are implemented and offers access to mitigation resources.
• Standing Advisory Committee: The Hazard Mitigation Advisory Committee will be expanded to a standing status and will meet at least once per year or more often as determined necessary to support hazard mitigation projects. The standing Hazard Mitigation Advisory Committee will be comprised of representatives from diverse community groups to provide ongoing input and oversight of hazard mitigation efforts. The standing Hazard Mitigation Advisory Committee will also serve as an important forum for future updates of the AHMP.
These activities ensure that the community remains informed and actively engaged in the plan’s implementation and maintenance.
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
8.2 Monitoring, Evaluation, and Maintenance
To ensure the continued effectiveness of this All-Hazard Mitigation Plan (AHMP), effective monitoring and evaluation will be conducted throughout the plan implementation period. Regular assessments will monitor progress and evaluate the achievements of the intended outcomes. Performance metrics will be developed to quantify the impact of each mitigation action, allowing for data driven adjustments and refinements.
The plan will be reviewed annually to assess progress on mitigation actions. Annual review will include the following elements:
• Annual Review Worksheets: Every year, LA County OEM will email each member of the Hazard Mitigation Advisory Committee an Annual Review Worksheet to complete. As shown in Appendix E, the Annual Review Worksheet reflects the FEMA Local Hazard Mitigation Plan Review Tool and includes the following sections: planning process, hazard profile, risk assessment, and mitigation strategy. Each member of the Hazard Mitigation Advisory Committee will email completed worksheets back to LA County OEM to review. LA County OEM will summarize these findings and email them out to the committee.
Additionally, the findings from the review worksheets will be presented to the full Hazard Mitigation Advisory Committee at its next regular meeting. • Mitigation Progress Project Reports: Mitigation actions will be monitored and updated using the Mitigation Project Progress Report. During each annual review, each department or agency currently administering a mitigation project will submit a progress report to LA County OEM. For projects that are being funded by a FEMA mitigation grant, FEMA quarterly reports may be used as the preferred reporting tool. As shown in Appendix E, the progress report will discuss the current status of the mitigation project, including any changes made to the project, identify implementation problems, and describe appropriate strategies to overcome them.
• Post-Incident Mitigation Review: Following a major disaster event impacting Los Angeles County, a post-disaster review will be initiated by LA County OEM to evaluate the need to update the AHMP based on the circumstances of the disaster and incorporate any specific mitigation actions required due to the DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
incident. If LA County OEM finds that an update to the AHMP is needed, the Hazard Mitigation Advisory Committee will be convened to begin drafting the update.
8.3 Criteria for Updating the Hazard Mitigation Plan
The All-Hazards Mitigation Plan (AHMP) is required to be updated every five years in compliance with the Disaster Mitigation Act of 2000 (DMA 2000) and FEMA guidance (44 CFR § 201.6). The update process is not merely an administrative requirement but a critical mechanism to evaluate the plan’s effectiveness in reducing risk and guiding mitigation strategies.
1. Review of Past Actions and Effectiveness
The update process begins with a thorough review of the mitigation actions outlined in the previous plan. This includes:
• Evaluating the implementation status of each action (completed, in progress, not started).
• Assessing the impact and effectiveness of completed actions in reducing hazard risk.
• Determining if the objectives are still relevant or require modification based on new data or circumstances.
2. Integration of New Data and Changing Conditions
• Hazard profiles and risk assessments are updated with new hazard event data, climate science, and changes in development or land use. • Demographic shifts and infrastructure changes are reviewed to reassess vulnerability.
• Technological advancements or improved modeling tools (e.g., Hazus, National Risk Index) are incorporated to refine risk analysis.
3. Community and Stakeholder Input
The update process must actively include community participation to maintain transparency and ensure the plan reflects local priorities. This includes:
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
• Public workshops and surveys.
• Targeted outreach to vulnerable populations including those with Access and Functional Needs (AFN).
• Feedback from County departments, cities, NGOs, and regional partners.
4. Performance Evaluation and Metrics
To ensure effectiveness, the plan maintenance strategy includes:
• Annual progress reports that monitor implementation progress and identify barriers.
• Metrics to evaluate the reduction of risk or exposure over time. • Documentation of lessons learned from real events and exercises to inform changes.
5. Revision of Goals, Objectives, and Actions
Based on the evaluation findings, the plan’s goals and mitigation actions are revised to improve alignment with current capabilities, risk levels, and funding opportunities.
Each updated action includes:
• Clear responsibilities.
• Realistic timelines.
• Evaluation metrics to measure future success.
8.4 Plan Update
The 2025 LHMP includes an updated methodology for future revisions, ensuring compliance with federal and state guidelines. A full plan update will occur every five years.
• 2030 AHMP Update Kickoff: LA County OEM will convene the Hazard Mitigation Advisory Committee for a meeting to review the worksheet findings and endeavor to begin the process of updating the AHMP in approximately November 2028. The planning process should begin a minimum of 18 months prior to the plan’s expiration. LA County OEM, in consultation with the Hazard Mitigation Advisory Committee, will develop a work plan for the update, conduct DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
research and review relevant documentation, determine hazards to be included in the 2030 AHMP, and begin the process to draft an updated AHMP. • Plan Submission and Adoption: Once updated, the plan is submitted to Cal OES and FEMA for review. Upon conditional approval, it must be adopted by the Los Angeles County Board of Supervisors and participating jurisdictions to maintain eligibility for FEMA Hazard Mitigation Assistance (HMA) grants.
8.5 Integration with Other Plans
Los Angeles County is committed to ensuring that hazard mitigation planning is not a standalone effort, but a fully integrated component of broader County planning initiatives. By strategically weaving the goals, objectives, and actions of the All-Hazards Mitigation Plan (AHMP) into a variety of local and regional plans such as the General Plan, Capital Improvement Plans, Climate Action and Adaptation Plans, and departmental strategic plans; the County promotes a more cohesive and effective approach to building long-term resilience. This integration is achieved through ongoing collaboration with County departments, cities, and regional agencies to align land use, infrastructure development, and emergency preparedness efforts with identified hazard risks. Embedding hazard mitigation principles into existing policies and planning mechanisms ensures that they become an inherent part of decisionmaking processes, project funding prioritization, and long-term investment strategies ultimately reducing vulnerabilities and enhancing the resilience of communities across Los Angeles County.
The Los Angeles County AHMP will be shared across all jurisdictions within the operational area. Those jurisdictions will have the opportunity to incorporate the 2025 AHMP into their established planning process. The Hazard Mitigation Advisory Committee will assess the plan at a yearly basis, acknowledging the dynamic nature of hazard landscapes and the evolving understanding of risks. The OEM Hazard Mitigation Program will make the AHMP available for all county departments to incorporate into departmental planning efforts, and other relevant documents produced by Los Angeles County departments.
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
9 Plan Adoption
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
9.1 Plan Adoption Overview
Plan Adoption addressed Element F of the Local Mitigation Plan Regulation Checklist under single jurisdiction plan requirement.
The Los Angeles County Board of Supervisors officially adopted the 2025 All Hazard Mitigation Plan (AHMP) through a formal resolution on September 9, 2025. A scanned copy of the resolution is included in Appendix F. The Los Angeles County Office of Emergency Management (OEM) will retain the resolution for its records, while copies will be submitted to both Cal OES and FEMA.
This Plan adoption completes the mitigation planning process and department agencies, stakeholders, and community’s commitment to the goals and actions. It also recognizes the current planning process and acknowledges changes from the past five years and validates the priorities for hazard mitigation actions. It makes the community eligible for certain FEMA assistance that can fund some mitigation actions.
After being adopted by the Los Angeles County Board of Supervisors, the 2025 AHMP transitions into the implementation phase. The success of the plan hinges on the integrating its mitigation strategies and actions into the local plans and policies. The mitigation action items collectively establish a robust framework to guide the County’s hazard mitigation strategies over the next five years. To ensure these strategies are effective, actionable and well aligned with the county’s long term resilience goals, the Planning Advisory Committee has set clear objectives. Their prioritized approach focuses on seamlessly blending mitigation actions with current policies, plans, and emphasizing collaboration and coherence throughout.
DRAFT
County of Los Angeles
All-Hazards Mitigation Plan
Appendices
DRAFT
JULY 1, 2021
Strategic Plan 2021 - 2026
Central Basin Municipal Water District
DRAFT
Central Basin Municipal Water District Strategic Plan
2 TABLE OF CONTENTS
Strategic Planning Process…………………………………………………………………………………………………………………………………… 3 Message from the Board President..……………………………………………………………………………………………………………………. 4 Introduction………………………………………………………………………………………………………………………………………………………… 5 Mission, Vision & Values……………………………………………………………………………………………………………………………………… 5 Current Sate Analysis (SWOT)……………………………………………………………………………………………………………………………… 6 Summary of Accomplishments……………………………………………………………………………………………………………………………. 7 Focus Areas & Goals……………………………………………………………………………………………………………………………………………. 8 Business Value Decision Making…………………………………………………………………………………………………………………………. 9 Key Performance Indicators………………………………………………………………………………………………………………………………. 10 Annual Goals & Budget Planning……………………………………………………………………………………………………………………….. 11 DRAFT
Central Basin Municipal Water District Strategic Plan
3 Step I:
Understand the mission,
vision and business value
proposition
Step II:
Perform Current State
Analysis (SWOT)
Step III:
Focus Areas: Goals
Step IV:
Business Value Decision
Making
Step V:
Key Performance
Indicators & Budget
Development
Strategic Planning Process
This strategic plan represents the five year planning cycle for the Central Basin Municipal Water District and builds upon the previous strategic plan. The key elements of the strategic planning process are outlined in Figure 1 below.
Figure 1 – Strategic Planning Process:
What follows in this document is a strategic plan that includes the following sections:
Introduction
Step I: Mission, Vision and Values;
Step II: Current State Analysis;
Step III: Focus Areas: Goals;
Step IV: Business Value Decision Making; and
Step V: Determination of Key Performance Indicators & Budget Development.
DRAFT
Central Basin Municipal Water District Strategic Plan
4 Message from the Board President
Welcome to the Central Basin Municipal Water District’s (“CBMWD” or “District”) Five-Year Strategic Plan. This document is a blueprint for how CBMWD will respond to current challenges and make the best of future opportunities for the benefit of its customers. It confirms its mission and goals as a public agency dedicated to providing high quality water service to the nearly two million residents in CBMWD's service area. It establishes approaches for the preservation of our precious resources for future generations utilizing the principles of sustainability and prudent fiscal practices. It also outlines the specific goals, strategies, and objectives we will pursue to move us from where we are to where we want to be and establishes a process to measure our progress.
The Strategic Plan for Central Basin Municipal Water District represents a collaborative effort that recognizes the significant water supply challenges facing the communities in our service area and the need to improve our region’s water reliability as well as support local water resource development.
The Central Basin Municipal Water District will bring value to the region through developing trust-based relationships with its member agencies (customers) who rely on CBMWD as a strategic partner to support local water resource development as well as provide an imported water supply to our service area.
The implementation of the Strategic Plan will require strong collaboration with our communities, fellow water utilities, and State and Federal regulatory agencies. The Strategic Plan will be reviewed with the Board and member agencies (purveyors) and adapted as conditions change.
The District’s Board of Directors and staff are charting a course for continued success in the future through the development and execution of this Strategic Plan. The Strategic Plan defines the vision, mission, values, goals, and future business strategy for CBMWD.
Our commitments to the communities we serve fall into four areas: water supply, financial integrity, education & advocacy, and energy & technology. These commitments are established as the four goals of the Strategic Plan.
Our Board actions will consistently support these commitments and staff will track the progress against this plan.
We the Central Basin Municipal Water District Board, are confident the Strategic Plan will help us achieve the expectations of those we serve in the months and years to come.
On behalf of the Board of Directors, this strategic plan is presented for publication:
Mr. Arturo Chacon
Director Division III
Board President
Central Basin Municipal Water District
DRAFT
Central Basin Municipal Water District Strategic Plan
5 Introduction
CBMWD is a public agency that was formed by the California Legislature in 1952 for the purpose of providing an adequate supply of water within its service area. CBMWD purchases imported water from the Metropolitan Water District of Southern California (MWD), an agency which provides the region with imported water. CBMWD wholesales the imported water to cities, mutual water companies, investor- owned utilities and private companies in southeast Los Angeles County. CBMWD also supplies water used for groundwater replenishment and provides the region with recycled water for municipal commercial, and industrial use. The District serves 24 cities with an overall population of 1.7 million.
CBMWD was established to help mitigate the over-pumping of underground water resources in southeast Los Angeles County. CBMWD founders realized they would have to curtail the use of relatively inexpensive yet diminishing local groundwater by providing the region with imported water. In 1954, CBMWD became a member agency of MWD. The CBMWD Directors appoint two representatives to the 37-member MWD Board of Directors; CBMWD is one of the largest member agencies of MWD. Today, in addition to imported water, CBMWD provides recycled water for irrigation, commercial applications, and industrial processes.
Mission, Vision and Values
The strategic planning process reaffirms the mission and vision of the Central Basin Municipal Water District, the strategic priorities to accomplish the vision, and reconfirms values to maintain as the Central Basin Municipal Water District works towards meeting these priorities.
Mission
The mission of the Central Basin Municipal Water District is to deliver reliable and high-quality water, as well as recycled water services to its customers and communities through effective and collegial partnerships with its retailers and other wholesalers.
Vision Statement
Central Basin Municipal Water District is an innovative, responsive, and effective steward of the water service and management responsibility entrusted to it.
Values
CBMWD will embody the following core values in the setting and implementation of its policies and practices:
Integrity - CBMWD and its representatives will consistently adhere to high moral and ethical principles; Collaboration - CBMWD, and its representative, swill cooperatively work together and with stakeholders to further the mission and goals of the organization;
Customer Service - CBMWD, and its representatives, will professionally and responsively serve the needs of its customers;
Fair, open, and responsive - CBMWD, and its representative, swill engage its stakeholders and interact with them in a fair, open, and honest manner;
Accountability - CBMWD, and its representatives, will take responsibility for and be accountable for all its actions;
Innovation - CBMWD, and its representatives will encourage and value the introduction of new ideas and methods.
DRAFT
Central Basin Municipal Water District Strategic Plan
6 Current State Analysis
A current state analysis, or environmental scan, is a review of everything that impacts the Central Basin Municipal Water District – either positively or negatively. It is an exercise to consider all assets and opportunities for the Central Basin Municipal Water District. It also identifies gaps, or vulnerabilities, that could impede the Central Basin Municipal Water District’s success.
An environmental scan is always limited – we can never know everything or predict the future. However, it is also a useful tool to consider the operating environment that can affect the success of the Central Basin Municipal Water District’s efforts.
Figure 3 below outlines the Current State Analysis process.
Figure 3 – Current State Analysis Process
What follows is a summary of feedback on Central Basin Municipal Water District’s strengths, weaknesses, opportunities and threats that would be identified by community members, our strategic business partners, our customers/member agencies (purveyors), district staff, and the Board.
Strengths
The Central Basin Municipal Water District’s strengths include:
Recycled Water Capacity/Allocation
Stable Financial Outlook
Mixed Governance Model
Regional Presence (Service Area)
Engineering & Infrastructure Expertise
Improving Financial Reserves & Investments
Metropolitan Water District of Southern California Member Agency Diversity of our service area
Strengths on which we want to build
upon
Identify and select opportunities that are
aligned with our mission and vision
Identify weaknesses that are critical to
address vs those that are not
Identify and find ways to minimize obstacles
that may impact our strategic plan
DRAFT
Central Basin Municipal Water District Strategic Plan
7 Weaknesses
The Central Basin Municipal Water District also has areas where improvement is needed. Weaknesses can be changed – they are not fixed qualities. Weaknesses identified include:
Governance Instability
Brand/Reputation & Public and Media Relations
Customer Relationships
Position Control
Recycled Water Customer Growth
Capital Investment Imported Water Connections
Capital Investment Recycled Water System & Pump Stations Governance Protocols & Compliance with Administrative Code Strategic Plan Implementation, Goal Development & Performance, and Data Driven Decision Making Opportunities
At times there are changes in the operating environment that can benefit the Central Basin Municipal Water District. It is important to recognize these changes and take advantage of opportunity. These include:
Recycled Water Demand
Lower the cost of Imported Water
Imported Water Connection (Reliability, Conservation, Local Supply Demands) Improved Governance Efficiency & Administrative Code Compliance Improved Relationships with Customers
Diversification of Services & Revenue
Energy & Technology Innovations
Internal Controls & Long-term Fiscal Stability
Improve Education, Outreach & Public and Media Relations Protect Governance Protocols & Compliance with Administrative Code Threats
Threats are those things that the Central Basin Municipal Water District has no or little control over. That does not mean that the Central Basin Municipal Water District is helpless. It means that the Central Basin Municipal Water District has to take purposeful steps to mitigate the negative impact of those threats. These include:
Climate Change
Seismic, Natural & Man-made Disasters
Fiscal & Human Resources Water Quality Compliance Pressures on Customers Political Distractions & Expenditure of Fiscal/Human Capital on Non-Mission Critical Issues Declining Imported Water Demand
Governance Instability & Ineffectiveness
Targeted Legislation Adversely Impacting District Governance and Operations Summary of Accomplishments from Previous 5 Year Plan
It is useful to include at the beginning of the current strategic plan, key accomplishments achieved during the previous five year planning horizon. Figure 2 presents a summary of the Central Basin Municipal Water District’s accomplishments.
DRAFT
Central Basin Municipal Water District Strategic Plan
8 Figure 2 - Accomplishments of the Central Basin Municipal Water District’s last five years:
CBMWD is considered a leader for education and outreach due to its award winning education program Governor Newsom signed legislation preserving CBMWD’s two seats on the Metropolitan Water District of Southern California
CBMWD received the certificate of transparency from the Special District Leadership Foundation for completion of all transparency program requirements designed to promote transparency in operations and governance to the public and other stakeholders
Montebello Golf Course connected to our recycled water system CBMWD has been recognized for excellence in technology by MISAC every year since 2007 CBMWD complied with and implemented all of the state auditor recommendations from the 2015 state audit
Activities from the 2015 strategic plan that had significant progress and/or were completed, are not carried forward into the current strategic plan. Activities that were not completed in the last planning horizon have been incorporated into the current strategic plan where appropriate.
FOCUS AREAS: Goals
Based upon the Mission, Vision, Values, Previous Five Year Accomplishments and the Current State Analysis, the Central Basin Municipal Water District should determine and define focus areas that will assist the Central Basin Municipal Water District in achieving its goals.
Below are the four focus areas including Central Basin Municipal Water District’s one-year, three-year and fiveyear goals for each focus area.
1. Water Supply: CBMWD will partner with retailers and wholesalers to provide a level of regional water reliability that ensures customers'/member agencies’ (purveyors’) water needs are met:
1.1 One-year Goal: Increase recycled water sales by 20%.
1.2 Three-year Goal: Connect (2) customers to imported water supply. Increase recycled water sales by 30%.
1.3 Five-year Goal: Connect (4) customers to imported water supply. Increase recycled water sales by 40%.
2. Financial Integrity: CBMWD will manage its financial resources in a responsible, effective, and transparent fashion:
2.1 One-year Goal: Improve reserves to $8.5M. Maintain DCR of 120%+. Refund eligible bonds.
2.2 Three-year Goal: Improve reserves to $9.5M. Maintain DCR of 120%+. Lower Imported Water Rates.
2.3 Five-year Goal: Implement a new rate structure that stabilizes imported water revenue, lowers imported water costs, provides improved services to customers (no additional cost), provides sufficient capital improvement program investment, maintains 120%+ DCR, and grows reserves to $12.5M.
3. Education & Advocacy: CBMWD will proactively educate, engage, inform, and provide support services to our K14 educational communities, customers/member agencies (purveyors), and service area residents related to water conservation and local water demand management resources available for: recycled water, water efficiency, groundwater, and stormwater programs/projects.
3.1 One-year Goal: Grow on-site recycled water retrofit program and water conservation outreach.
DRAFT
Central Basin Municipal Water District Strategic Plan
9 3.2 Three-year Goal: Initiate one stormwater project. Add one new industrial recycled water customer. Reestablish our K14 educational outreach and educational program. Provide local resource development and groundwater support to our customers in collaboration with WRD.
3.3 Five-year Goal: Establish partnership(s) to provide certification and training opportunities for K14 students interested in a career as a water operator and/or civil engineer. Formalize support of ongoing local resource development and groundwater support with interested customers, small water systems and mutual water companies in collaboration with WRD.
4. Energy & Technology: CBMWD will implement energy and technology initiatives that result in efficient, cost effective and zero energy operations.
4.1 One-year Goal: Assess the options and solutions for technology and energy innovation/implementation.
4.3 Three-year Goal: Implement technology and energy solutions that results in a reduction of operational costs and/or improves revenues by 10%.
4.3 Five-year Goal: Implement technology and energy solutions that results in a reduction of operational costs, recovery of non-revenue water and/or improvement of revenues by 30%. Be a net-zero energy utility.
Business Value Decision Making
Determining which activities to focus on first is one of the greatest challenges of implementing a strategic plan. A process to prioritize the activities needs to be undertaken in order to focus the Central Basin Municipal Water District’s resources in implementing its strategic plan and leading to successful outcomes. The key benefits and costs of each activity should be outlined as much as possible. Figure 4 below outlines this process.
Figure 4 – Activity Prioritization Process
The above analysis can be organized into tables shown in Figure 5 on the following page.
DRAFT
Central Basin Municipal Water District Strategic Plan
10 Figure 5 – Activity Table Example
Focus Area: Energy & Technology: Goal: One-Year Goal: Move to Hosted (SAAS) Tyler Technologies Activities Owner Timeline Benefits (Value) Estimated
Costs
Estimated
Benefits ($)
Transition to
more secure
and affordable
ERP system
IT, GM, Finance Staff 1 month Tyler Technologies has been our ERP provider for over 10 years - -
Start transition IT, NICP, Tyler Tech,
Finance Staff 6 months
Tyler has a hosted ERP solution
with Improved security and
disaster recovery
$10,000 -
Complete
Transition
IT, GM, NICP, Tyler
Tech, Finance Staff 2 months Reduced operating, software, service & equipment costs $165,000 $45,000/yr cost savings Based upon each activity’s cost/benefit analysis, the Central Basin Municipal Water District can now prioritize all of the activities identified for each strategic priority. This prioritization of activities will be reflected in the multiyear financial plan as well as the annual budget, which are described in more detail in separate documents.
Determination of Key Performance Indicators & Budget Development Based on the goal, each activity should have specific key performance indicators that are Specific, Measurable, Attainable, Realistic and Timely (S.M.A.R.T.) making the vision more concrete by defining how success is measured. Performance indicators are used to monitor progress towards strategic priorities, closing the gap between the current state and the desired state, as defined by the vision. They will help track the realization of strategic priorities, measuring the progress towards realizing the vision. Performance indicators should focus on desired outcomes for strategic priorities.
When determining key performance indicators, the following principles should be kept in mind:
Link to the Central Basin Municipal Water District’s goals; Limit to the select few that measure success;
Guide desired decisions and behaviors;
Can be easily understood and measured; and
Are relevant to all Central Basin Municipal Water District’s stakeholders.
Once the Central Basin Municipal Water District has defined its key performance indicators, targets can be set, which are the value of a key performance indicator at a specific moment in time. Targets can be set on a yearly basis or by the end of the five year plan and focus on outcomes or actions.
In order to keep track of the progress towards achieving the strategic plan and the Central Basin Municipal Water District’s vision, a process to monitor and measure performance must be put in place. An owner should be identified for each process and the frequency of reporting should be specified and should aim to be at least annually, if not quarterly.
DRAFT
Central Basin Municipal Water District Strategic Plan
11 It is possible that certain activities may need to be revisited and recalibrated due to changes in the internal and external environment and reprioritized depending on the results attained each year.
Budget Development
In order to gain the full benefit of the strategic plan, it must be implemented in a way that helps to guide all actions of the staff and Board; furthermore, it must remain an integrated part of the annual budget planning process and supported by data-driven strategic decision making.
The Annual Budget Planning Document will ensure the annual budget development process is aligned to the strategic plan and focus area goals.
DRAFT
Central Basin Municipal Water District Strategic Plan
12 Annual Budget Planning Document
Focus Area: Water Supply: CBMWD will partner with retailers and wholesalers to provide a level of regional water reliability that ensures customers'/member agencies’ (purveyors’) water needs are met:
GOAL Annual Budget 1-YR 3-YR 5-YR
Increase Recycled Water Development $50,000 4,150/AF 4,950/AF 6,500/AF Districtwide grant writing, leak detection, UWMP services $500,000 20% participation
50%
participation
80%
participation
Water Conservation & Efficiency Participation $350,000 1 Project 3 Projects 5 Projects Professional Services & Support $500,000 1 Project 2 Projects 3 Projects DRAFT
Central Basin Municipal Water District Strategic Plan
13 Annual Budget Planning Document
Focus Area: Financial Integrity: CBMWD will manage its financial resources in a responsible, effective, and transparent fashion:
GOAL Annual Budget 1-YR 3-YR 5-YR
DCR of 120% or higher - 124.8% 125% 125%
Rate Structure affordable and adequate (REV) $10,545,240 $10,860,575 $11,186,392 $11,521,984 Annual CIP Budget $1,300,000 $1,750,000 $1,950,00 $2,100,000 RTS & Capacity Charges $969,753 $940,660 $912,440 $885,067 DRAFT
Central Basin Municipal Water District Strategic Plan
14 Annual Budget Planning Document
Focus Area: Education & Advocacy: CBMWD will proactively educate, engage, inform, and provide support services to our K14 educational communities, customers/member agencies (purveyors), and service area residents related to water conservation and local water demand management resources available for: recycled water, water efficiency, and stormwater programs/projects:
GOAL Annual Budget 1-YR 3-YR 5-YR
On-site Retrofit Program Participation $75,000 1 Project 2 Projects 3 Projects Water Conservation & Efficiency Participation $50,000 1 Project 2 Projects 3 Projects K14+ Educational Outreach $50,000 1 District 3 Districts 5 Districts Community Outreach & Education $250,000 1 Project 3 Projects 4 Projects DRAFT
Central Basin Municipal Water District Strategic Plan
15 Annual Budget Planning Document
Focus Area: Energy & Technology: CBMWD will implement energy and technology initiatives that result in efficient, cost effective and zero energy operations:
GOAL Annual Budget 1-YR 3-YR 5-YR
Reduce On-site Technology Infrastructure $150,000 20% CloudHosted 60% CloudHosted80% CloudHosted
Zero Energy Footprint $600,000 - 50% Progress
100% Zero
Energy
SMART Utility Implementation $250,000
CBMWD
Recycled Water
System
1 Proof of
Concept
1 Implementation
Artificial Intelligence: CIP Planning Software $50,000
CBMWD
Recycled Water
System
1 Proof of
Concept
1 Implementation
DRAFT
Appendix C
Water Loss Audits
DRAFT
Water Audit Report for:
Reporting Year:
All volumes to be entered as: ACRE-FEET PER YEAR
Master Meter and Supply Error Adjustments
WATER SUPPLIED Pcnt: Value:
Volume from own sources: 8 5,318.250 acre-ft/yr 3 acre-ft/yr Water imported: 7 203.540 acre-ft/yr 3 acre-ft/yr
Water exported: n/a 0.000 acre-ft/yr acre-ft/yr
Enter negative % or value for under-registration
WATER SUPPLIED: 5,575.900 acre-ft/yr Enter positive % or value for over-registration .
AUTHORIZED CONSUMPTION
Billed metered: 7 5,098.090 acre-ft/yr
Billed unmetered: n/a acre-ft/yr
Unbilled metered: n/a acre-ft/yr Pcnt: Value:
Unbilled unmetered: 5 13.940 acre-ft/yr 1.25% 24061 acre-ft/yr AUTHORIZED CONSUMPTION: 5,112.030 acre-ft/yr
WATER LOSSES (Water Supplied - Authorized Consumption) 463.870 acre-ft/yr Apparent Losses Pcnt: Value:
Unauthorized consumption: 13.940 acre-ft/yr 0.25% acre-ft/yr Customer metering inaccuracies: 4 77.636 acre-ft/yr 1.50% acre-ft/yr Systematic data handling errors: 5 12.745 acre-ft/yr 0.25% acre-ft/yr Apparent Losses: 104.321 acre-ft/yr
Real Losses (Current Annual Real Losses or CARL)
Real Losses = Water Losses - Apparent Losses: 359.549 acre-ft/yr WATER LOSSES: 463.870 acre-ft/yr
NON-REVENUE WATER
NON-REVENUE WATER: 477.810 acre-ft/yr
= Water Losses + Unbilled Metered + Unbilled Unmetered
SYSTEM DATA
Length of mains: 9 177.6 miles
Number of active AND inactive service connections: 8 7,604 Service connection density: 43 conn./mile main
Yes
Average length of customer service line: ft
Average operating pressure: 5 70.0 psi
COST DATA
Total annual cost of operating water system: 10 $9,926,450 $/Year Customer retail unit cost (applied to Apparent Losses): 8 $3.40 Variable production cost (applied to Real Losses): 5 $701.70 $/acre-ft WATER AUDIT DATA VALIDITY SCORE:
PRIORITY AREAS FOR ATTENTION:
1: Volume from own sources
2: Customer metering inaccuracies
3: Variable production cost (applied to Real Losses)
Based on the information provided, audit accuracy can be improved by addressing the following components:
$/100 cubic feet (ccf)
Default option selected for unauthorized consumption - a grading of 5 is applied but not displayed *** YOUR SCORE IS: 70 out of 100 ***
A weighted scale for the components of consumption and water loss is included in the calculation of the Water Audit Data Validity Score
1.000
13.570
Default option selected for Systematic data handling errors - a grading of 5 is applied but not displayed Average length of customer service line has been set to zero and a data grading score of 10 has been applied Are customer meters typically located at the curbstop or property line? AWWA Free Water Audit Software:
Reporting Worksheet
13.940
2020 7/2019 - 6/2020
City of Paramount (1910105)
<----------- Enter grading in column 'E' and 'J' ----------> -54.110 ?
?
?
?
?
? Click to access definition
?
?
?
?
?
?
Please enter data in the white cells below. Where available, metered values should be used; if metered values are unavailable please estimate a value. Indicate your confidence in the accuracy of the input data by grading each component (n/a or 1-10) using the drop-down list to the left of the input cell. Hover the mouse over the cell to obtain a description of the grades ?
?
?
?
?
?
(length of service line, beyond the property
boundary, that is the responsibility of the utility)
Use buttons to select percentage of water
supplied OR
value Click here: ?
for help using option buttons below
?
?
?
?
+
+ Click to add a comment WAS v5.0 +
+
+
+
+
+
American Water Works Association. Copyright © 2014, All Rights Reserved. ? ?
? +
+
+
+
+
+
+
+
+
+
+
+
+ Use Customer Retail Unit Cost to value real losses
?
To select the correct data grading for each input, determine the highest grade where the utility meets or exceeds all criteria for that grade and all grades below it.
AWWA Free Water Audit Software v5.0 Reporting Worksheet 1 DRAFT
Water Audit Report for:
Audit Year:
All volumes to be entered as: ACRE-FEET PER YEAR
WATER SUPPLIED choose entry option:
VOS Volume from Own Sources: n g 4 3,165.530 Acre-ft/Yr n g 10 percent acre-ft/yr under-registration VOSEA WI Water Imported: n g 4 2,205.400 Acre-ft/Yr n g 3 percent acre-ft/yr select….. WIEA WE Water Exported: n g n/a 0.000 Acre-ft/Yr n g n/a percent acre-ft/yr select….. WEEA 5,370.930 Acre-ft/Yr
.
AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 5 5,134.696 Acre-ft/Yr
BUAC Billed Unmetered: n g n/a 0.000 Acre-ft/Yr
UMAC Unbilled Metered: n g n/a 0.000 Acre-ft/Yr choose entry option:
UUAC Unbilled Unmetered: n g 3 12.837 Acre-ft/Yr 0.25% default acre-ft/yr 24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 5,147.533 Acre-ft/Yr
WATER LOSSES 223.397 Acre-ft/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:
SDHE Systematic Data Handling Errors: n g 3 12.837 Acre-ft/Yr 0.25% default acre-ft/yr CMI Customer Metering Inaccuracies: n g 2 0.000 Acre-ft/Yr percent acre-ft/yr under-registration UC Unauthorized Consumption: n g 3 12.837 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unauthorized Consumption, with automatic data grading of 3
25.673 Acre-ft/Yr
Real Losses
197.724 Acre-ft/Yr
223.397 Acre-ft/Yr
NON-REVENUE WATER
236.234 Acre-ft/Yr
SYSTEM DATA
Lm Length of mains: n g 6 177.6 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 10 7,400 (active and inactive) Service connection density: 42 conn./mile main
select...
Lp Average length of (private) customer service line: n g 1 6.0 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 8 70.0 psi
COST DATA
CRUC Customer Retail Unit Charge: n g 9 $2.94
VPC Variable Production Cost: n g $663.74 $/acre-ft $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:
Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
Unit Total Losses: gal/conn/day
Unit Apparent Losses: gal/conn/day
Unit Real LossesA: gal/conn/day
Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) go to start page
NON-REVENUE WATER:
If entering an
Error Adjustment,
select under- or overregistration
WATER SUPPLIED:
AUTHORIZED CONSUMPTION:
Apparent Losses:
Click 'g' for 1 parameter(s), then complete all visible data grading questions to enable the Data Validity Score to calculate $/100 cubic feet (ccf) Total Annual Operating Cost
Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:
Worksheet
City of Paramount
Jul 01 2020 - Jun 30 2021
Water Supplied Error Adjustments
2021 Fiscal
Real Losses:
WATER LOSSES:
Click 'g' to determine data validity grade Click 'n' to add notes FWAS v6.0 American Water Works Association. Copyright © 2020, All Rights Reserved.
To access definitions, click the input name
To edit water system info:
AWWA Free Water Audit Software v6.0 Worksheet 1
DRAFT
Water Audit Report for:
Reporting Year:
All volumes to be entered as: ACRE-FEET PER YEAR
Master Meter and Supply Error Adjustments
WATER SUPPLIED Pcnt: Value:
Volume from own sources: 8 2,705.610 acre-ft/yr acre-ft/yr Water imported: 7 2,606.050 acre-ft/yr acre-ft/yr
Water exported: n/a 0.000 acre-ft/yr acre-ft/yr
Enter negative % or value for under-registration
WATER SUPPLIED: 5,311.660 acre-ft/yr Enter positive % or value for over-registration .
AUTHORIZED CONSUMPTION
Billed metered: 7 5,152.544 acre-ft/yr
Billed unmetered: n/a acre-ft/yr
Unbilled metered: n/a acre-ft/yr Pcnt: Value:
Unbilled unmetered: 5 13.750 acre-ft/yr 1.25% 24061 acre-ft/yr AUTHORIZED CONSUMPTION: 5,166.294 acre-ft/yr
WATER LOSSES (Water Supplied - Authorized Consumption) 145.366 acre-ft/yr Apparent Losses Pcnt: Value:
Unauthorized consumption: 13.279 acre-ft/yr 0.25% acre-ft/yr Customer metering inaccuracies: 3 105.154 acre-ft/yr 2.00% acre-ft/yr Systematic data handling errors: 12.881 acre-ft/yr 0.25% acre-ft/yr Apparent Losses: 131.314 acre-ft/yr
Real Losses (Current Annual Real Losses or CARL)
Real Losses = Water Losses - Apparent Losses: 14.052 acre-ft/yr WATER LOSSES: 145.366 acre-ft/yr
NON-REVENUE WATER
NON-REVENUE WATER: 159.116 acre-ft/yr
= Water Losses + Unbilled Metered + Unbilled Unmetered
SYSTEM DATA
Length of mains: 9 177.6 miles
Number of active AND inactive service connections: 9 7,400 Service connection density: 42 conn./mile main
Yes
Average length of customer service line: ft
Average operating pressure: 5 70.0 psi
COST DATA
Total annual cost of operating water system: 10 $8,443,184 $/Year Customer retail unit cost (applied to Apparent Losses): 9 $34.32 Variable production cost (applied to Real Losses): 5 $1,957.17 $/acre-ft WATER AUDIT DATA VALIDITY SCORE:
PRIORITY AREAS FOR ATTENTION:
1: Customer metering inaccuracies
2: Water imported
3: Variable production cost (applied to Real Losses)
Default option selected for Systematic data handling errors - a grading of 5 is applied but not displayed Average length of customer service line has been set to zero and a data grading score of 10 has been applied Are customer meters typically located at the curbstop or property line? AWWA Free Water Audit Software:
Reporting Worksheet
13.750
2022 7/2021 - 6/2022
City of Paramount (1910105)
<----------- Enter grading in column 'E' and 'J' ----------> Based on the information provided, audit accuracy can be improved by addressing the following components:
$/100 cubic feet (ccf)
Default option selected for unauthorized consumption - a grading of 5 is applied but not displayed *** YOUR SCORE IS: 69 out of 100 ***
A weighted scale for the components of consumption and water loss is included in the calculation of the Water Audit Data Validity Score
1.000
13.570
?
?
?
?
?
? Click to access definition
?
?
?
?
?
?
Please enter data in the white cells below. Where available, metered values should be used; if metered values are unavailable please estimate a value. Indicate your confidence in the accuracy of the input data by grading each component (n/a or 1-10) using the drop-down list to the left of the input cell. Hover the mouse over the cell to obtain a description of the grades ?
?
?
?
?
?
(length of service line, beyond the property
boundary, that is the responsibility of the utility)
Use buttons to select percentage of water
supplied OR
value Click here: ?
for help using option buttons below
?
?
?
?
+
+ Click to add a comment WAS v5.0 +
+
+
+
+
+
American Water Works Association. Copyright © 2014, All Rights Reserved. ? ?
? +
+
+
+
+
+
+
+
+
+
+
+
+ Use Customer Retail Unit Cost to value real losses
?
To select the correct data grading for each input, determine the highest grade where the utility meets or exceeds all criteria for that grade and all grades below it.
AWWA Free Water Audit Software v5.0 Reporting Worksheet 1 DRAFT
Water Audit Report for:
Reporting Year:
All volumes to be entered as: ACRE-FEET PER YEAR
Master Meter and Supply Error Adjustments
WATER SUPPLIED Pcnt: Value:
Volume from own sources: 8 2,712.160 acre-ft/yr acre-ft/yr Water imported: 7 2,328.220 acre-ft/yr acre-ft/yr
Water exported: n/a 0.000 acre-ft/yr acre-ft/yr
Enter negative % or value for under-registration
WATER SUPPLIED: 5,040.380 acre-ft/yr Enter positive % or value for over-registration .
AUTHORIZED CONSUMPTION
Billed metered: 7 4,692.480 acre-ft/yr
Billed unmetered: n/a acre-ft/yr
Unbilled metered: n/a acre-ft/yr Pcnt: Value:
Unbilled unmetered: 5 13.750 acre-ft/yr 1.25% 24061 acre-ft/yr AUTHORIZED CONSUMPTION: 4,706.230 acre-ft/yr
WATER LOSSES (Water Supplied - Authorized Consumption) 334.150 acre-ft/yr Apparent Losses Pcnt: Value:
Unauthorized consumption: 12.601 acre-ft/yr 0.25% acre-ft/yr Customer metering inaccuracies: 3 95.765 acre-ft/yr 2.00% acre-ft/yr Systematic data handling errors: 11.731 acre-ft/yr 0.25% acre-ft/yr Apparent Losses: 120.097 acre-ft/yr
Real Losses (Current Annual Real Losses or CARL)
Real Losses = Water Losses - Apparent Losses: 214.053 acre-ft/yr WATER LOSSES: 334.150 acre-ft/yr
NON-REVENUE WATER
NON-REVENUE WATER: 347.900 acre-ft/yr
= Water Losses + Unbilled Metered + Unbilled Unmetered
SYSTEM DATA
Length of mains: 9 177.6 miles
Number of active AND inactive service connections: 9 7,400 Service connection density: 42 conn./mile main
Yes
Average length of customer service line: ft
Average operating pressure: 5 70.0 psi
COST DATA
Total annual cost of operating water system: 10 $8,813,350 $/Year Customer retail unit cost (applied to Apparent Losses): 9 $34.32 Variable production cost (applied to Real Losses): 5 $2,025.38 $/acre-ft WATER AUDIT DATA VALIDITY SCORE:
PRIORITY AREAS FOR ATTENTION:
1: Customer metering inaccuracies
2: Water imported
3: Variable production cost (applied to Real Losses)
Default option selected for Systematic data handling errors - a grading of 5 is applied but not displayed Average length of customer service line has been set to zero and a data grading score of 10 has been applied Are customer meters typically located at the curbstop or property line? AWWA Free Water Audit Software:
Reporting Worksheet
13.750
2023 7/2022 - 6/2023
City of Paramount (1910105)
<----------- Enter grading in column 'E' and 'J' ----------> Based on the information provided, audit accuracy can be improved by addressing the following components:
$/100 cubic feet (ccf)
Default option selected for unauthorized consumption - a grading of 5 is applied but not displayed *** YOUR SCORE IS: 69 out of 100 ***
A weighted scale for the components of consumption and water loss is included in the calculation of the Water Audit Data Validity Score
1.000
13.570
?
?
?
?
?
? Click to access definition
?
?
?
?
?
?
Please enter data in the white cells below. Where available, metered values should be used; if metered values are unavailable please estimate a value. Indicate your confidence in the accuracy of the input data by grading each component (n/a or 1-10) using the drop-down list to the left of the input cell. Hover the mouse over the cell to obtain a description of the grades ?
?
?
?
?
?
(length of service line, beyond the property
boundary, that is the responsibility of the utility)
Use buttons to select percentage of water
supplied OR
value Click here: ?
for help using option buttons below
?
?
?
?
+
+ Click to add a comment WAS v5.0 +
+
+
+
+
+
American Water Works Association. Copyright © 2014, All Rights Reserved. ? ?
? +
+
+
+
+
+
+
+
+
+
+
+
+ Use Customer Retail Unit Cost to value real losses
?
To select the correct data grading for each input, determine the highest grade where the utility meets or exceeds all criteria for that grade and all grades below it.
AWWA Free Water Audit Software v5.0 Reporting Worksheet 1 DRAFT
Water Audit Report for:
Audit Year:
All volumes to be entered as: ACRE-FEET PER YEAR
WATER SUPPLIED choose entry option:
VOS Volume from Own Sources: n g 4 2,811.950 Acre-ft/Yr n g 10 percent acre-ft/yr under-registration VOSEA WI Water Imported: n g 7 2,183.650 Acre-ft/Yr n g 3 percent acre-ft/yr select….. WIEA WE Water Exported: n g n/a 0.000 Acre-ft/Yr n g n/a percent acre-ft/yr select….. WEEA 4,995.600 Acre-ft/Yr
.
AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 8 4,769.000 Acre-ft/Yr
BUAC Billed Unmetered: n g n/a 0.000 Acre-ft/Yr
UMAC Unbilled Metered: n g n/a 0.000 Acre-ft/Yr choose entry option:
UUAC Unbilled Unmetered: n g 3 11.923 Acre-ft/Yr 0.25% default acre-ft/yr 24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 4,780.923 Acre-ft/Yr
WATER LOSSES 214.678 Acre-ft/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:
SDHE Systematic Data Handling Errors: n g 3 11.923 Acre-ft/Yr 0.25% default acre-ft/yr CMI Customer Metering Inaccuracies: n g 3 72.624 Acre-ft/Yr 1.50% percent acre-ft/yr under-registration UC Unauthorized Consumption: n g 3 11.923 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unauthorized Consumption, with automatic data grading of 3
96.469 Acre-ft/Yr
Real Losses
118.208 Acre-ft/Yr
214.678 Acre-ft/Yr
NON-REVENUE WATER
226.600 Acre-ft/Yr
SYSTEM DATA
Lm Length of mains: n g 8 184.9 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 5 7,556 (active and inactive) Service connection density: 41 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 7 65.0 psi
COST DATA
CRUC Customer Retail Unit Charge: n g 10 $4.19
VPC Variable Production Cost: n g 9 $948.51 $/acre-ft $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:
Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Customer Metering Inaccuracies (CMI) Unit Apparent Losses: gal/conn/day 3: Water Imported (WI) Unit Real LossesA
: gal/conn/day
Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) go to start page
NON-REVENUE WATER:
If entering an
Error Adjustment,
select under- or overregistration
WATER SUPPLIED:
AUTHORIZED CONSUMPTION:
Apparent Losses:
Average length of customer service line has been set to zero and a data grading of 10 has been applied A weighted scale for the components of supply, consumption and water loss is included in the calculation of the Water Audit Data Validity Score *** The Water Audit Data Validity Score is in Tier III (51-70). See Dashboard tab for additional outputs. *** $/100 cubic feet (ccf)
$9,145,505
Total Annual Operating Cost
Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:
Worksheet
13.750
City of Paramount
Jul 01 2023 - Jun 30 2024
Water Supplied Error Adjustments
2024 FY
Real Losses:
WATER LOSSES:
Click 'g' to determine data validity grade Click 'n' to add notes FWAS v6.0 American Water Works Association. Copyright © 2020, All Rights Reserved.
To access definitions, click the input name
To edit water system info:
AWWA Free Water Audit Software v6.0 Worksheet 1
DRAFT
Water Audit Report for:
Audit Year:
All volumes to be entered as: ACRE-FEET PER YEAR
WATER SUPPLIED choose entry option:
VOS Volume from Own Sources: n g 4 2,778.980 Acre-ft/Yr n g 10 1.90% percent acre-ft/yr under-registration VOSEA WI Water Imported: n g 7 2,289.100 Acre-ft/Yr n g 4 0.00% percent acre-ft/yr WIEA WE Water Exported: n g n/a 0.000 Acre-ft/Yr n g n/a percent acre-ft/yr WEEA 5,121.903 Acre-ft/Yr
.
AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 5 4,962.660 Acre-ft/Yr
BUAC Billed Unmetered: n g n/a 0.000 Acre-ft/Yr
UMAC Unbilled Metered: n g n/a 0.000 Acre-ft/Yr choose entry option:
UUAC Unbilled Unmetered: n g 3 12.407 Acre-ft/Yr 0.25% default acre-ft/yr 24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 4,975.067 Acre-ft/Yr
WATER LOSSES 146.837 Acre-ft/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:
SDHE Systematic Data Handling Errors: n g 3 12.407 Acre-ft/Yr 0.25% default acre-ft/yr CMI Customer Metering Inaccuracies: n g 7 47.092 Acre-ft/Yr 0.94% percent acre-ft/yr under-registration UC Unauthorized Consumption: n g 3 12.407 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unauthorized Consumption, with automatic data grading of 3
71.905 Acre-ft/Yr
Real Losses
74.932 Acre-ft/Yr
146.837 Acre-ft/Yr
NON-REVENUE WATER
159.243 Acre-ft/Yr
SYSTEM DATA
Lm Length of mains: n g 10 184.9 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 10 7,556 (active and inactive) Service connection density: 41 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 9 65.0 psi
COST DATA
CRUC Customer Retail Unit Charge: n g 5 $4.57
VPC Variable Production Cost: n g 10 $918.87 $/acre-ft $/yr (optional input) carbon
WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:
Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Billed Metered (BMAC) Unit Apparent Losses: gal/conn/day 3: Water Imported (WI) Unit Real LossesA
: gal/conn/day
Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) go to start page
NON-REVENUE WATER:
If entering an
Error Adjustment,
select under- or overregistration
WATER SUPPLIED:
AUTHORIZED CONSUMPTION:
Apparent Losses:
Average length of customer service line has been set to zero and a data grading of 10 has been applied A weighted scale for the components of supply, consumption and water loss is included in the calculation of the Water Audit Data Validity Score *** The Water Audit Data Validity Score is in Tier III (51-70). See Dashboard tab for additional outputs. *** $/100 cubic feet (ccf)
$4,656,893
Total Annual Operating Cost
Click here to calculate carbon emissions --->
Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:
Worksheet
City of Paramount
Jul 01 2024 - Jun 30 2025
Water Supplied Error Adjustments
2025 Fiscal
Real Losses:
WATER LOSSES:
Click 'g' to determine data validity grade Click 'n' to add notes FWAS v6.1 American Water Works Association. Copyright © 2025, All Rights Reserved.
To access definitions, click the input name
To edit water system info:
AWWA Free Water Audit Software v6.0 Worksheet 1
DRAFT
Appendix D
AWWA Standards
DRAFT
Table 1. Standards UPDATED: 1/30/2026
System name PWSID Baseline Real Loss (gpscd) Baseline Real Loss (gpmd) Real Loss Standard (gpscd) Real Loss Standard (gpmd) Required Real Loss Reduction from
Baseline (%)
30-yr Benefit-Cost
Ratio*
Paramount City Of CA1910105 61.8 - 20.2 - 67 12.1
**Apparent loss standards are equal to the baseline apparent loss, expressed here in gallons per connection per day, calculated from information in Table 2. *Benefit-cost ratios are only calculated for those with standards requiring reduction, not for those maintaining current real water loss. The model does not calculate benefit-cost ratios for those maintaining real water loss.
NOTE: Negative Real Losses are replaced with 0 gpcd to calculate a standard.
DRAFT
Table 2. Data for Standards
System Name PWSID Real Loss (AF/yr) Length of Mains (mi) Number of Connections Variable Production Cost ($) Avg Operating Pressure (psi) Apparent Loss (AF/yr) Paramount City Of CA1910105 515.2 165.7 7444.5 506.2 68.8 113.8 DRAFT
Appendix E
2024 Consumer Confidence Report
DRAFT
DRAFT
Since 1991, California water utilities have been providing information on water served to its consumers. This report, prepared in April 2025, is a snapshot of the tap water quality that we provided last year. Included are details about where your water comes from, how it is tested, what is in it, and how it compares with state and federal limits. We strive to keep you informed about the quality of your water, and to provide a reliable and economic supply that meets all regulatory requirements.
WHERE DOES MY TAP WATER COME FROM?
HOW DO I READ THE WATER QUALITY TABLE?
WHAT ARE DRINKING WATER STANDARDS?
Your tap water
comes from 2
sources:
groundwater and
surface water. We
pump groundwater
from local, deep
wells. We also use
Metropolitan Water
District of Southern
California’s (MWD)
surface water from
both the Colorado
River and the State Water Project in northern
California. These water sources supply our service area shown on the adjacent map. The quality of our
groundwater and MWD’s surface water supplies is
presented in this report.
Although we test for over 100 substances, regulations
require us to report only those found in your water. The first column of the water quality table lists substances detected in your water. The next columns list the
average concentration and range of concentrations
found in your drinking water. Following are columns
that list the MCL and PHG or MCLG, if appropriate. The
last column describes the likely sources of these
substances in drinking water.
To review the quality of your drinking water, compare
the highest concentration and the MCL. Check for
substances greater than the MCL. Exceedance of a
primary MCL does not usually constitute an immediate
health threat. Rather, it requires testing the source
water more frequently for a short duration.
If test results show that the water continues to exceed the MCL, the water must be treated to remove the
substance, or the source must be removed from
service.
HOW IS MY DRINKING WATER TESTED?
Your drinking water is tested regularly for unsafe levels of chemicals, radioactivity and bacteria at the source
and in the distribution system. We test weekly,
monthly, quarterly, annually or less often depending
on the substance. State and federal laws allow us to
test some substances less than once per year because
their levels do not change frequently. All water quality tests are conducted by specially trained technicians in state-certified laboratories.
The U.S Environmental Protection Agency (USEPA)
limits the amount of certain substances allowed in tap
water. In California, the State Water Resources Control Board (State Water Board) regulates tap water quality
by enforcing limits that are at least as stringent as the Federal EPA’s (USEPA). Historically, California limits are more stringent than the Federal ones.
There are two types of these limits, known as
standards. Primary standards protect you from
substances that could potentially affect your health.
Secondary standards regulate substances that affect
the aesthetic qualities of water. Regulations set a
Maximum Contaminant Level (MCL) for each of the
primary and secondary standards. The MCL is the
highest level of a substance that is allowed in your
drinking water.
Public Health Goals (PHGs) are set by the California
Environmental Protection Agency. PHGs provide more
information on the quality of drinking water to
customers, and are similar to
their federal counterparts,
Maximum Contaminant Level
Goals (MCLGs). PHGs and
MCLGs are advisory levels that
are non-enforceable. Both
PHGs and MCLGs are
concentrations of a substance
below which there are no known
or expected health risks.
DRAFT
WHY DO I SEE SO MUCH COVERAGE IN THE
NEWS ABOUT THE QUALITY OF TAP WATER?
SHOULD I TAKE ADDITIONAL PRECAUTIONS?
Contaminants that may be present in source water
include:
The sources of drinking water (both tap water and
bottled water) include rivers, lakes, streams, ponds,
reservoirs, springs and wells.
As water travels over the surface of the land or through the ground, it dissolves naturally occurring minerals
and, in some cases, radioactive material, and can pick
up substances resulting from the presence of animals
or from human activity.
Drinking water, including bottled water, may reasonably be expected to contain at least small amounts of some
contaminants. The presence of contaminants does not
necessarily indicate that water poses a health risk. More information about contaminants and potential health
effects can be obtained by calling the USEPA’s Safe
Drinking Water Hotline (1-800-426-4791). You can also get more information on tap water by logging on to these
helpful web sites:
Some people may be more vulnerable to contaminants
in drinking water than the general population.
Immunocompromised persons such as persons with
cancer undergoing chemotherapy, persons who have
undergone organ transplants, people with HIV/AIDS or
other immune system disorders, some elderly, and
infants can be particularly at risk from infections. These people should seek advice about drinking water from
their health care providers. The USEPA/Centers for
Disease Control guidelines on appropriate means to
lessen the risk of infection of Cryptosporidium and other microbial contaminants are available from the USEPA’s
Safe Drinking Water Hotline (1-800-426-4791).
If present, elevated levels of lead can cause serious health problem, especially for pregnant women and young
children. Lead in drinking water is primarily from
materials and components associated with services lines and home plumbing. The City of Paramount is
responsible for providing high quality drinking water, but cannot control the variety of materials used in plumbing components. When your water has been sitting for
several hours, you can minimize the potential for lead
exposure by flushing your tap for 30 seconds to 2
minutes before using water for drinking or cooking. If
you are concerned about lead in your water, you may
wish to have your water
tested. Information on lead in
drinking water, testing
methods, and steps you can
take to minimize exposure is
available from the Safe
Drinking Water Hotline or at
www.epa.gov/safewater/lead.
In order to ensure that tap water
is safe to drink, the USEPA and
the State Water Resources
Control Board (State Water
Board) prescribe regulations
that limit the amount of certain
contaminants in water provided
by public water systems. U.S.
Food and Drug Administration
regulations and California law
also establish limits for
contaminants in bottled water
that provide the same
protection for public health.
• Microbial contaminants, including viruses and
bacteria, that may come from sewage treatment
plants, septic systems, agricultural livestock operations, and wildlife.
• Inorganic contaminants, such as salts and metals,
that can be naturally-occurring or result from urban
stormwater runoff, industrial or domestic wastewater
discharges, oil and gas production, mining or farming.
• Pesticides and herbicides, which may come from a
variety of sources such as agriculture, urban
stormwater runoff, and residential uses.
• Organic chemical contaminants, including synthetic
and volatile organic chemicals, that are byproducts of
industrial processes and petroleum production, and
can also come from gas stations, urban stormwater
runoff, agricultural application, and septic systems.
• Radioactive contaminants, which can be naturally
occurring or be the result of oil and gas production
and mining activities.
www.epa.gov/ground-water-and-drinking-water/safedrinking-water-information (USEPA’s web site)
www.waterboards.ca.gov/drinking_water/certlic/
drinkingwater/Chemicalcontaminants.html
(State Board web site)
DRAFT
SOURCE WATER ASSESSMENT
HOW CAN I PARTICIPATE IN DECISIONS ON
WATER ISSUES THAT AFFECT ME?
HOW DO I CONTACT MY WATER AGENCY IF I
HAVE ANY QUESTIONS ABOUT WATER
QUALITY?
MWD completed an assessment of its Colorado River
and State Water Project supplies in 2002. Colorado
River supplies are considered most vulnerable to
recreation, urban/storm water runoff, increasing
urbanization in the watershed, and wastewater. State
Water Project supplies are considered most vulnerable
to urban/storm water runoff, wildlife, agriculture,
recreation and wastewater. A copy of the assessment
can be obtained by contacting MWD at (213) 217-6850.
The City of Paramount conducted an assessment of its
groundwater supplies in 2003. Groundwater supplies
are considered most vulnerable to chemical/petroleum
processing/storage, metal plating/finishing/fabricating, dry cleaners, automobile gas stations, automobile body
shops, automobile repair shops, junk/scrap/salvage
yards, and plastics/synthetics producers.
A copy of the Source Water Assessment is available by
contacting the Paramount Public Works Department
at (562) 220-2020.
The public is welcome to attend Public Works
Commission meetings located at Paramount City Hall,
16400 Colorado Avenue, Paramount, CA 90723.
Meetings are held on the 1st Thursday of each month
at 6:00 p.m.
If you have specific questions about your tap water
quality, please contact Adriana Figueroa, Director of
Public Works at (562) 220-2020.
SOME HELPFUL WATER CONSERVATION TIPS
• Fix leaky faucets in
your home – save up to
20 gallons every day for
every leak stopped
• Save between 15 and
50 gallons each time by
only washing full loads
of laundry
• Adjust your sprinklers
so that water lands on
your lawn/garden, not
the sidewalk/driveway – save 500 gallons per month
• Use organic mulch around plants to reduce
evaporation – save hundreds of gallons a year
• Use a water-efficient showerhead. They are
inexpensive, easy to install, and can save you up to 750 gallons a month.
Visit www.epa.gov/watersense for more details.
Visit us at www.paramountcity.gov
DRAFT
On behalf of the City of Paramount’s
Water Divison, we appreciate you taking
the time to review the 2024 Consumer
Confidence Report (CCR). Our Water
Division works hard every day to
deliver safe, clean, and reliable
water, maintaining 130 miles of
water lines, upgrading smart
meters, and improving
infrastructure to better serve
you. Thank you for your trust
and support!
En nombre de la División de Agua de la
Ciudad de Paramount, agradecemos su
tiempo para revisar el Informe de
Confianza del Consumidor (CCR) de
2024. Nuestra División de Agua trabaja
arduamente todos los días para
brindar agua segura, limpia y
confiable, manteniendo 210
kilómetros de tuberías,
modernizando medidores
inteligentes y mejorando la
infraestructura para
brindarle un mejor
servicio. ¡Gracias por su
confianza y apoyo!
-CITY OF PARAMOUNT WATER DIVISION
DRAFT
Results are from the most recent testing
performed in accordance with state and
federal drinking water regulations. The State
allows monitoring for some contaminants less
than once per year because the
concentrations of these contaminants do not
change frequently. Some of the data, though
representative, are more than one year old.
Los resultados provienen de las pruebas más
recientes realizadas de acuerdo con las
regulaciones estatales y federales sobre agua
potable. El Estado permite el monitoreo de
algunos contaminantes menos de una vez al
año porque las concentraciones de estos
contaminantes no cambian con frecuencia.
Algunos de los datos, aunque representativos,
tienen más de un año.
DRAFT
DRAFT
DRAFT
Desde 1991, las agencias proveedoras de recursos hidráulicos de California han emitido información sobre el agua que se provee al consumidor. Este informe, elaborado en abril de 2025, es una instantánea de la calidad del agua del grifo que proporcionamos el año pasado. Incluímos detalles sobre el origen del agua que toma, cómo se analiza, que contiene, y cómo se compara con los límites estatales y federales. Nos esforzamos por mantenerle informado sobre la calidad de su agua, y proveerle un abastecimiento confiable y económico que cumpla con todos los requisitios.
¿DE DÓNDE PROVIENE EL AQUA QUE TOMO?
¿CUALES SON LOS ESTÁNDARES DEL AGUA
POTABLE?
Su agua de la llave
proviene de 2
fuentes: de las
aguas naturales
(subterránea) y de
aguas superficiales
(de los ríos).
Bombeamos aguas
naturales de
profundos pozos
locales. También
usamos agua
superficial de la
agencia Metropolitan Water District del Sur de
California (MWD) importada del Río Colorado y del
proyecto State Water Project del Norte de California.
Estas dos fuentes de agua nos abastecen en las áreas
de servicio que se muestran en el mapa adjunto. Este
reporte informa sobre la calidad de nuestra agua
subterranea y el abastecimiento del agua superficial
del MWD. ¿CÓMO SE ANALIZA MI AGUA POTABLE?
El agua que toma se analiza regularmente para
asegurarnos de que no halla niveles altos de
sustancias químicas, de radioactividad o de bacteria
en el sistema de distribución y en las tomas de
servicios. Estos análisis se
llevan a cabo semanal,
mensual, trimestral, y
anualmente o con más
frecuencia, dependiendo de la
sustancia analizada. Bajo las
leyes estatales y federales, se
nos permite analizar algunas
sustancias menos
frecuentemente que los
periodos anuales porque los
resultados no cambian.
La Agencia de Protección Ambiental estadounidense
(USEPA) limita la cantidad de ciertas sustancias
permitidas en el agua del grifo. En California, la Junta de Control de Recursos Hídricos del Estado (State
Water Board) regula la calidad del agua de beber
siguiendo normas que sean al menos tan estrictas
como las normas federales. Históricamente, los límites
de California son más rigurosos que los Federales.
Hay dos tipos de límites conocidos como estándares.
Los estándares primarios lo protegen de sustancias
que potencialmente podrían afectar su salud. Las
normas establecen los Niveles Contaminantes
Máximos (MCL, en inglés) que se permite del
contaminante primario o secundario en el agua de
beber. Los abastecedores de agua deben asegurarse
de que la calidad de esta cumpla con los Niveles
Contaminantes Máximos (o MCLs, en inglés). No todas
las sustancias tienen un Nivel Contaminante Máximo.
El plomo y el cobre, por ejemplo, son regulados, por
cierto nivel de acción. Si cualquier sustancia química
sobrepasa el nivel de acción, se dará la necesidad de
un proceso de tratamiento para rebajar los niveles en
el agua de beber. Los abastecedores de agua deben
cumplir con los Niveles Contaminantes Máximos para
asegurar la calidad del agua.
Las Metas para la Salud Pública ( MSP [o PHGs, en
inglés]) son establecidas por la agencia estatal de
California-EPA. Las PHGs proveen más información
con respecto a la calidad del agua, y son similares a los reglamentos federales nombrados Metas para Los
Niveles de Contaminante Maximos (MNCM [o MCLGs,
en inglés]). Las PHGs y MCLGs son metas a nivel
recomendable. Las PHG y MCLG son ambas definidas
como los niveles de contaminantes en el agua potable
por debajo de los niveles donde no se esperan riesgos
a la salud y no enforzables. Ambos niveles PHG y
MCLG son concentraciones de una sustancia en las
que no hay riesgos a la salud aún conocidos.
Desde 1991, las agencias proveedoras de recursos hidráulicos de California han emitido información sobre el agua que se provee al consumidor. Este informe, elaborado en abril de 2025, es una instantánea de la calidad del agua del grifo que proporcionamos el año pasado. Incluímos detalles sobre el origen del agua que toma, cómo se analiza, que contiene, y cómo se compara con los límites estatales y federales. Nos esforzamos por mantenerle informado sobre la calidad de su agua, y proveerle un abastecimiento confiable y económico que cumpla con todos los requisitios.
DRAFT
¿CÓMO INTERPRETO MI INFORME DE CALIDAD
DEL AGUA?
Aunque analizamos más de 100 sustancias, las normas
nos requireren que reportemos solo aquellas que se
encuentran en el agua. La primer columna en la tabla
de la calidad de agua muestra la lista de las sustancias detectadas en el agua. La siguiente columna muestra
la lista de la concentracion promedio y el rango de
concentraciones que se hallan encontrado en el agua
que usted toma. En seguida están las listas de el MCL,
el PHG y el MCLG, si estos son apropiados. La última
columna describe las probables fuentes u origen de las
sustancias detectadas en el agua potable.
Para revisar la calidad de su agua de beber, compare
los valores por encima del promedio, mínimos y
máximos y el Nivel Contaminante Máximo. Revise
todos los químicos que se encuentran por encima del
Nivel Contaminante Máximo. Si los químicos
sobrepasan el Nivel Contaminante Máximo no significa
que sea detrimental a la salud de inmediato. Más bien,
se requiere que se realizen análisis más
frecuentemente en el abastecimiento del agua por un
corto período. Si los resultados muestran sobrepasar el MCL, el agua debe ser tratada para remover esa
sustancia, o el abastecimiento de esta debe
decomisionarse.
¿POR QUÉ HAY TANTA PUBLICIDAD SOBRE LA
CALIDAD DEL AGUA POTABLE?
Entre los contaminantes que puenden existir en las
fuentes de agua se incluyen:
Las fuentes del agua potable (de ambas agua de la
llave y agua embotellada) incluye ríos, lagos, arroyos, lagunas, embalses, manantiales, y pozos. Al pasar el
agua por la superficie de los suelos o por la tierra, se disuelven minerales que ocurren al natural, y en
algunas ocasiones, material radioactivo, al igual que
pueden levantar sustancias generadas por la presencia
de animales o por actividades humanas.
Toda el agua potable, incluyendo el agua embotellada,
puede contener cantidades pequeñas de ciertos
contaminantes. La presencia de contaminantes no
necesariamente indica que haya algún riesgo de
salud. Para más información acerca de
contaminantes y riesgos a la salud favor de llamar a la USEPA encargada de proteger el agua potable al
teléfono (1-800-426-4791). Usted puede obtener más
información sobre el agua potable al conectarse al
Internet en los siguientes domicilios:
A fin de asegurar que el agua de
la llave es segura para beber, la
Agencia de Protección
Ambiental de Los Estados
Unidos (USEPA) y el Tablero de
Control de Recursos de Echar
agua Estatal (Bordo Estatal)
prescriben regulaciones que
limitan la cantidad de ciertos
contaminantes en el agua
proporcionada por sistemas de
agua públicas. Las regulaciones
de la Administración de
Alimentos y Medicamentos de
Estados Unidos y la ley de
California también establecen límites para los
contaminantes en el agua embotellada que brindan
la misma protección para la salud pública.
• Contaminantes microbiales como los viruses y la
bacteria, los que pueden venir de las plantas de
tratamiento de aguas negras, de los sistemas sépticos,
de las operaciones de ganadería, y de la vida salvaje.
• Contaminantes inorgánicos, como las sales y los
metales, los cuales pueden ocurrir naturalmente o
como resultado del desagüe pluvial, industrial, o de
alcantarillado, producción de gas natural y petróleo,
minas y agricultura.
www.epa.gov/ground-water-and-drinking-water/
safe-drinking-water-information
(el sitio Web del USEPA)
www.waterboards.ca.gov/drinking_water/certlic/
drinkingwater/Chemicalcontaminants.html
(sitio Web de Bordo Estatal)
• Pesticidas y herbicidas, los cuales pueden venir de
varias fuentes tales como la agricultura, del desagüe
pluvial, y de usos residenciales.
• Contaminantes de otras sustancias químicas
orgánicas, incluyendo químicos orgánicos volátiles y
sintéticos que son productos de procesos industriales
y de la producción de petróleo, y que pueden provenir
de las estaciones de gasolina, desagües pluviales
urbanos, y agricultura applicación y de sistemas
sépticos.
• Contaminantes radioactivos, los cuales puenden
ocurrir naturalmente o que puenden ser resultados de
las actividades de la producción de gas natural y
minería.
DRAFT
¿DEBERÍA TOMAR OTRAS PRECAUCIONES?
VALORACIÓN DE SU ABASTECIMIENTO DE
AGUA
Algunas personas pueden ser más vulnerables a los
contaminantes en el agua potable que el público en
general. Las personas que tienen problemas
imunológicos, o sea esas personas que estén en
tratamiento por medio de quimoterapia cancerosa;
personas que tienen órganos transplantados, o
personas con SIDA o desordenes imunológicos,
personas de edad avanzada, y los bebés que son
particularmente suseptibles a ciertas infecciones. Estas personas deben de consultar a sus proveedores de
salud médica. Las guias de la USEPA/Centros de
Control de Enfermedades aconsejan cómo disminuir
los riesgos para prevenir la infección de
Cryptosporidium y otros contaminantes microbiales
están disponibles por teléfono de la USEPA encargada
de proteger el agua potable al teléfono
(1-800-426-4791).
MWD terminó un gravamen de sus fuentes del
proyecto del agua del río y del estado de Colorado en
2002. Las fuentes del río de Colorado se consideran las más vulnerables a la reconstrucción, salida urbana/de
la precipitación excesiva, aumentando la urbanización
en la línea divisoria de las aguas, y las aguas residuales.
Las fuentes del proyecto del agua del estado se
consideran las más vulnerables a salida, a fauna, a
agricultura, a reconstrucción y a las aguas residuales
urbanas/de la precipitación excesiva. Una copia del
gravamen se puede obtener por MWD que entra en
contacto con en (213) 217-6850.
La ciudad de Paramount condujo un gravamen de sus
fuentes de la agua subterránea en 2003. Grlas fuentes
del oundwater se consideran las más vulnerables al
proceso/almacenaje, galjanoplastia de metal/el acabar/
el fabricar, tintoreros, gasolineras del automóvil, tiendas de cuerpo del automóvil, talleres de reparaciones del
automóvil, yardas de la chatarra/del desecho/del
salvamento, y plásticos/productores del producto
químico/del petróleo de los sintéticos. Una copia de la Evaluación de la fuente de agua está disponible
comunicándose con el Departamento de Obras
Públicas de Paramount al (562) 220-2020.
Si presente, los niveles elevados del plomo pueden
causar el problema de salud serio, sobre todo para
mujeres embarazadas y chiquitos. El plomo en el agua
potable es principalmente de materiales y
componentes asociados con líneas de servicios y a
casafontanería. Cuidad de Paramount es responsable
de proporcionar el agua potable de alta calidad, pero
no puede controlar la variedad de materiales usados en
la fontanería de componentes. Cuando su agua ha
estado sentándose durante varias horas, usted puede
minimizar el potencial para la exposición de plomo
limpiando con agua su
grifo durante 30 segundos
a 2 minutos antes de usar
el agua para beber o
cocinarse. Si usted está
preocupado por el plomo
en su agua, usted puede
desear hacer probar su
agua. La información en el
plomo en el agua potable, probando métodos, y pasos
que usted puede tomar para minimizar la exposición
está disponible de la Línea directa de Agua Potable
Segura o en www.epa.gov/safewater/lead.
El público es agradable assistir a las reuniones de la
Comisión de las obras públicas situadas en la ciudad
pasillo, avenida de 16400 Colorado, Paramount, CA de
Paramount 90723. Las reuniones se celebran en el
primer Jueves de cada mes en 6:00 P.M.
Si tiene preguntas específicas sobre la calidad del
agua de su grifo, comuníquese con Adriana Figueroa,
Director de Obras Públicas al (562) 220-2020.
¿CÓMO PUEDO PARTICIPAR EN LAS DECISIONES SOBRE ASUNTOS ACERCA DEL AGUA QUE ME PUEDAN AFECTAR ?
¿CÓMO ME PONGO EN CONTACTO CON MI
AGENCIA DEL AGUA SI TENGO PREGUNTAS
SOBRE LA CALIDAD DEL AGUA?
DRAFT
• Arreglar los grifos que
gotean en su hogar -
excepto hasta 20 galones
cada día por cada detenido
de fugas
• Guardar entre 15 y 50
galones por cada vez que el
lavado sólo cargas
completas de ropa
• Ajuste sus regaderas de
modo que el agua caiga en su césped / jardín, no la
acera / calzada - excepto 500 galones por mes
• Utilice pajote orgánico alrededor de las plantas para reducir la evaporación - guardar cientos de galones por año
• Usan cabezal de ducha eficiente de agua. Ellos son
baratos, fáciles para instalar, y pueden salvarle hasta 750 galones por mes.
Visite www.epa.gov/watersense para obtener más
información.
ALGUNAS EXTREMIDADES PROVECHOSAS DE
LA CONSERVACIÓN DEL AGUA
Visítenos en www.paramountcity.gov
DRAFT
Appendix F
City Resolution to Adopt the UWMP-WSCP
DRAFT
Appendix G
Ordinances
DRAFT
CITY OF PARAMOUNT
LOS ANGELES COUNTY, CALIFORNIA
ORDINANCE NO. 1050
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
PARAMOUNT, CALIFORNIA, ESTABLISHING A WATER
CONSERVATION AND WATER SUPPLY PROGRAM AND
REGULATIONS
WHEREAS, a reliable minimum supply of potable water is essential to the public health, safety and welfare of the people and economy of the southern California region;
WHEREAS, Southern California is a semi-arid region and is largely dependent upon imported water supplies. A growing population, climate change, environmental concerns and other factors in other parts of the State and western United States, make the region highly susceptible to water supply reliability issues;
WHEREAS, careful water management that includes active water conservation measures not only in times of drought, but at all times, is essential to ensure reliable minimum supply of water to meet current and future water supply needs;
WHEREAS, Article X, Section 2 of the California Constitution declares that the general welfare requires that water resources be put to beneficial use, waste or unreasonable use or unreasonable method of use of water be prevented, and conservation of water be fully exercised with a view to the reasonable and beneficial use thereof;
WHEREAS, California Water Code Section 375 et seq. requires water suppliers to adopt and enforce a comprehensive water conservation program to reduce water consumption and conserve supplies;
WHEREAS, on January 17, 2014 the Governor proclaimed a state of emergency caused by the dry conditions, which called for Californians to reduce water use twenty percent (20%);
WHEREAS, the State of California Water Resources Control Board, responding to the Governor’s call for water conservation, adopted provisions requiring urban water agencies to place mandatory water use restrictions on outdoor water use or to implement Water Shortage Contingency Plans to accomplish same;
DRAFT
Ordinance No. 1050
WHEREAS, California Water Code Section 350 et seq. authorizes any public entity, including a special district, to declare a water shortage emergency and, upon declaration of that emergency, adopt regulations and restrictions on the delivery and consumption of water in order to conserve water resources during the period of the emergency and until the supply of water available for distribution by the suppliers has been replenished or augmented; WHEREAS, the adoption and enforcement of water conservation and supply shortage program is necessary to manage the City’s potable water supply in the short- and long-term and to avoid or minimize the impacts of drought and shortage within the City. Such a program is essential to ensure a reliable and sustainable minimum supply of water for the public health, safety and welfare; and
WHEREAS, based upon the above findings, the City’s legal counsel advises, and the Council finds, that actions taken pursuant to this ordinance are categorically exempt from CEQA according to 14 California Code of Regulations 15301 and 15307.
THE CITY COUNCIL OF THE CITY OF PARAMOUNT, CALIFORNIA,
DOES HEREBY ORDAIN AS FOLLOWS:
Section 1. The Paramount Municipal Code is hereby amended by adding thereto Chapter 46, Article V. to read as follows:
Article V. Water Conservation.
Sec. 46-9. Declaration of purpose and intent.
(a) The purpose of this ordinance is to establish a water conservation and supply shortage program that will reduce water consumption within the City through conservation, enable effective water supply planning, assure reasonable and beneficial use of water, prevent waste of water, and maximize the efficient use of water within the City to avoid and minimize the effect and hardship of water shortage to the greatest extent possible. (b) This ordinance establishes three stages of water supply shortage response actions to be implemented during times of declared water shortage or declared water shortage emergency, with increasing restrictions on water use in response to worsening drought or decreasing supplies and emergency conditions.
Sec. 46-10. Definitions.
The following words and phrases whenever used in this ordinance shall have the meaning defined in this section:
DRAFT
Ordinance No. 1050
“City” means the City of Paramount.
“Landscape irrigation system” means an irrigation system with pipes, hoses, spray heads, or sprinkling devices that are operated by hand or through an automated system.
“Person” means any natural person or persons, corporation, public or private entity, governmental agency or institution or any other user of water provided by the City.
“Potable water” means water which is suitable for drinking. “Recycled water” means the reclamation and reuse of non-potable water for beneficial use.
Sec. 46-11. Application.
(a) The provisions of this ordinance apply to any person in the use of any potable water provided by the City.
(b) The provisions of this ordinance do not apply to uses of water necessary to protect public health and safety or for essential government services, such as police, fire and other similar emergency services. (c) The provisions of this ordinance do not apply to the use of recycled water. (d) The provisions of this ordinance do not apply to the use of water by commercial nurseries and commercial growers to sustain plants, trees, shrubs, crops or other vegetation intended for commercial sale. (e) This ordinance is intended solely to further the conservation of water. It is not intended to implement any provision of federal, state, or local statutes, ordinances, or regulations relating to protection of water quality or control of drainage or runoff. Refer to the local jurisdiction or Regional Water Quality Control Board for information on any state based ordinances and stormwater management plans.
Sec. 46-12. Stage 1 water supply shortage.
(a) A Stage 1 Water Supply Shortage condition exists when the City determines, in its sole discretion, that due to drought or other supply reductions, a consumer demand reduction is required in order to ensure that sufficient supplies will be available to meet anticipated demands.
Upon the declaration of a Stage 1 Water Supply Shortage condition, the City shall implement the mandatory Stage 1 conservation measures identified in this section. These requirements are in addition to the water conservation items stated in the Waste Water Ordinance.
DRAFT
Ordinance No. 1050
(b) Water conservation measures: The following water conservation requirements apply during a declared Stage 1 Water Supply Shortage:
(1) Limits on watering: Watering or irrigation of lawn, landscape or other vegetated area with potable water is limited to 3 designated days per week. During the months of November through March, watering or irrigation of lawn, landscape or other vegetated area with potable water is limited to no more than 2 designated days per week. This provision does not apply to landscape irrigation systems that exclusively use very low-flow drip type irrigation systems when no emitter produces more than 2 gallons of water per hour. This provision does not apply to use of a hand-held bucket or similar container, a hand-held hose equipped with a positive self closing water shut-off device, or for very short periods for the express purpose of adjusting or repairing an irrigation system. The days per week designated for use of irrigation shall be determined by the Director of Public Works and shall not be implemented until publically noticed.
(2) Obligation to fix leaks, breaks or malfunctions: All leaks, breaks, or other malfunctions in the water user’s plumbing, distribution, or irrigation system must be remedied within seventy two (72) hours of observation and/or notification by the City.
(3) No excessive water flow or run-off: Watering or irrigation of any lawn, landscape or other vegetated area in a manner that causes or allows excessive water flow or run-off onto an adjoining sidewalk, driveway, street, alley, gutter or ditch must be repaired within 5 days of observation and/or notification by the City.
(4) No washing down hard or paved surfaces: Washing down hard or paved surfaces, including but not limited to sidewalks, walkways, driveways, parking areas, tennis courts, patios or alleys is prohibited except when necessary to alleviate safety or sanitary hazards and only by use of a hand-held bucket or similar container, a low-volume high pressure cleaning machine equipped to recycle any water used or a low volume high pressure water broom.
(5) Re-circulating water required for water fountains and decorative water features: Operating a water fountain or other decorative water feature that does not use re-circulating water is prohibited. (6) Limits on washing vehicles: Using water to wash or clean a vehicle including but not limited to any automobile, truck, van, bus, motorcycle, boat or trailer whether motorized or not is prohibited, except by use of a hand-held bucket or similar container or a handheld hose equipped with a positive self-closing water shut-off nozzle or device.
DRAFT
Ordinance No. 1050
(7) Drinking water served upon request only: Restaurants are prohibited from providing drinking water to any person unless expressly requested by that person.
(8) Use only recycled water for construction site dust control, consolidation of backfill.
(9) Other prohibited uses: The City Council may implement other prohibited water uses as determined by the City after notice to customers.
Sec. 46-13. Stage 2 water supply shortage.
(a) A Stage 2 Water Supply Shortage condition exists when the City determines, in its sole discretion, that due to drought or other supply reductions a consumer demand reduction is required in order to ensure that sufficient supplies will be available to meet anticipated demands.
Upon the declaration of a Stage 2 Water Supply Shortage condition, the City shall implement the mandatory Stage 2 conservation measures identified in this section.
(b) Conservation measures: In addition to the prohibited uses of water identified in Section 46-12, the following additional water conservation requirements apply during a declared Stage 2 Water Supply Shortage:
(1) Limits on watering: Watering or irrigation of lawn, landscape or other vegetated area with potable water is limited to 2 designated days per week. During the months of November through March, watering or irrigation of lawn, landscape or other vegetated area with potable water is limited to no more than 1 designated day per week. This provision does not apply to landscape irrigation systems that exclusively use very low-flow drip type irrigation systems when no emitter produces more than 2 gallons of water per hour. This provision does not apply to use of a hand-held bucket or similar container, a hand-held hose equipped with a positive self closing water shut-off device, or for very short periods for the express purpose of adjusting or repairing an irrigation system. The days per week designated for use of irrigation shall be determined by the Director of Public Works and shall not be implemented until publically noticed.
(2) Obligation to fix leaks, breaks or malfunctions: All leaks, breaks, or other malfunctions in the water user’s plumbing, distribution, or irrigation system must be remedied within forty eight (48) hours of observation and/or notification by the City.
DRAFT
Ordinance No. 1050
(3) No filling, cleaning and/or refilling of decorative fountains, ornamental lakes or ponds except to the extent needed to sustain aquatic life, provided that such animals have been actively managed within the water feature prior to declaration of this supply shortage stage. (4) Residential car washing prohibited: Use car washes available with water recycling systems.
(5) The filling or topping off of any new or existing residential pools or outdoor spas is prohibited.
(6) Planting of new turf grass is prohibited.
(7) Outdoor evaporative mist coolers are prohibited.
(8) Main line flushing is allowed for emergency purposes only. (9) Other prohibited uses: The City may implement other prohibited water uses as determined by the City Council, after notice to customers.
Sec. 46-14. Stage 3 water supply shortage – emergency condition. (a) A Stage 3 Water Supply Shortage condition is also referred to as an “emergency” condition. A Stage 3 Water Supply Shortage condition exists when the City declares a water shortage emergency in a manner and upon the grounds set forth in California Water Code Section 350 et seq.
Upon the declaration of a Stage 3 Water Supply Shortage condition pursuant to California Water Code Section 350 et seq., the City will implement the mandatory Stage 3 conservation measures identified in this section.
(b) Additional conservation measures: In addition to the prohibited uses of water identified in Sections 46-12 and 46-13 the following water conservation requirements apply during a declared Stage 3 Water Supply Shortage Emergency:
(1) Limited watering or irrigating: Watering or irrigating of lawn, landscape or other vegetated area with potable water is restricted in accordance with allotments as set forth by the City during a Stage 3 Water Supply Shortage. This restriction does not apply to the use of recycled water or to the following categories of use, subject to the hardship waiver provisions as described in Section 46-16:
a. Maintenance of existing landscape necessary for fire protection; b. Maintenance of existing landscape for soil erosion control; DRAFT
Ordinance No. 1050
c. Maintenance of plant materials identified to be rare or essential to the well-being of protected species;
d. Maintenance of landscape within active public parks and playing fields, daycare centers, golf course greens, and school grounds, provided that such irrigation does not exceed 2 days per week; e. Actively irrigated environmental mitigation projects. (2) Obligation to fix leaks, breaks or malfunctions: All leaks, breaks, or other malfunctions in the water user’s plumbing, distribution, or irrigation system must be remedied within twenty four (24) hours of observation and/or notification by the City.
(3) Other prohibited uses: The City may implement other prohibited water uses as determined by the City Council, after notifying customers.
Sec. 46-15. Procedures for determination/notification of water supply shortage. (a) Determination and notification of a Stage 1 or Stage 2 Water Supply Shortage condition: The existence of a Stage 1 or Stage 2 Water Supply Shortage condition will be declared by resolution of the Council adopted at a regular or special public meeting held in accordance with State law. The mandatory conservation measures applicable to Stage 1 and Stage 2 Water Supply Shortage conditions, respectively, shall take effect on the tenth day after the date the shortage condition is declared. Within five days following the declaration of the shortage condition, the City shall publish a copy of the resolution once in a newspaper used for publication of official notices.
If the City Council establishes a water allocation, the City shall provide notice of the allocation by including it in the regular billing statement or by another mailing to the address to which the City customarily mails the billing statement for fees or charges for on-going water service. A water allocation shall be effective on the fifth day following the date of mailing or at such later date as specified in the notice.
(b) Determination and notification of a Stage 3 Water Supply Shortage condition (“emergency” condition): The existence of a Stage 3 Water Supply Shortage condition may be declared in accordance with the requirements and procedures specified in California Water Code Section 350 et seq.
The mandatory conservation measures applicable to a Stage 3 Water Supply Shortage condition shall take effect immediately upon the City Council declaration of a “Water Shortage Emergency” pursuant to California Water Code Section 350 et seq. As soon as practicable DRAFT
Ordinance No. 1050
following the Council’s declaration of a “Water Shortage Emergency,” the City shall publish a copy of the declaration once in a newspaper used for publication of official notices.
If the City Council establishes a water allocation, the City shall provide notice of the allocation by including it in the regular billing statement or by another mailing to the address to which the City customarily mails the billing statement for fees or charges for on-going water service. A water allocation shall be effective on the fifth day following the date of mailing or at such later date as specified in the notice.
Sec. 46-16. Hardship waiver.
(a) Undue and disproportionate hardship: If, due to unique circumstances, a specific requirement of this ordinance would result in undue hardship to a person using water or to property upon which water is used, that is disproportionate by the impacts to water users generally or to similar property or classes of water users, then the person may apply for a waiver to the requirements as provided in this section.
(b) Written finding: The waiver may be granted or conditionally granted only upon a written finding of the existence of facts demonstrating an undue hardship to a person using water or to property upon which water is used, that is disproportionate to the impacts to water users generally or to similar property or classes of water use due to specific and unique circumstances of the user or the user’s property:
(1) Application: Application for a waiver shall be on a form prescribed by the City and shall be accompanied by a non-refundable processing fee in an amount set by resolution of the Council.
(2) Supporting documentation: The application may be accompanied by photographs, maps, drawing and other information, including a written statement of the applicant.
(3) Required findings for variance: An application for a waiver shall be denied unless the appropriate authority finds, based in the information provided in the applications, supporting documents, or such additional information as may be requested, and on water use information for the property as shown by the records of the City or its Agent, all of the following:
a. That the waiver does not constitute a grant of special privilege inconsistent with the limitations upon other residents and businesses;
DRAFT
Ordinance No. 1050
b. That because of special circumstances applicable to the property or its use, the strict application of this ordinance would have a disproportionate impact on the property or use that exceeds the impacts to similarly situated residences and businesses;
c. That the authorizing of such waiver will not be of substantial detriment to adjacent properties, and will not materially affect the ability of the City to effectuate the purpose of this ordinance and will not be detrimental to the public interest; and d. That the condition or situation of the subject property or the intended use of the property for which the waiver is sought is not common or general in nature.
(4) Approval authority: The Director of Public Works (or designee) shall exercise approval authority and act upon any completed application no later than ten (10) days after submittal and may approve, conditionally approve, or deny the waiver. The applicant requesting the waiver shall be promptly notified in writing of any action taken.
Unless specified otherwise at the time a waiver is approved the waiver applies to the subject property during the term of the mandatory water supply shortage condition.
(5) Appeals to the Council: An applicant can appeal a decision or condition to the City Manager on a waiver application to the City of Paramount within 10 days of the decision upon written request for a hearing. The request shall state the grounds for the appeal. At a public meeting, the City of Paramount shall act as the approval authority and review the appeal following the regular waiver procedure. The decision of the City of Paramount is final.
Sec. 46-17. Penalties and violations.
(a) Misdemeanor: Any violation of City ordinances may be prosecuted as a misdemeanor punishable by imprisonment in the county jail for not more than thirty (30) days, or by a fine not exceeding one thousand dollars ($1,000), or by both.
(b) Civil penalties: Civil penalties for failure to comply with any provisions of the ordinance shall be as follows:
Stage 1
(1) First violation: The City shall issue a written courtesy door hanger describing the violation and deliver a copy of this ordinance by mail.
DRAFT
Ordinance No. 1050
(2) Second violation: A second violation within the preceding twelve (12) calendar months is punishable by a fine not to exceed one hundred dollars ($100.00).
(3) Third violation: A third violation within the preceding twelve (12) calendar months is punishable by a fine not to exceed one hundred and fifty dollars ($150.00).
(4) Fourth violation: A fourth violation is punishable by a fine not to exceed two hundred dollars ($200.00).
(5) Fifth and subsequent violations: A fifth and subsequent violation is punishable by a fine not to exceed five hundred dollars ($500.00). a. Water flow restrictor: In addition to any fines, the City may install a water flow restrictor device of approximately one gallon per minute capacity for services up to one and one-half inch size and competitively sized restrictors for larger services after written notice of intent to install a restrictor for a minimum of forty-eight (48) hours.
Stages 2 & 3
(1) First violation: The first violation is punishable by a fine not to exceed one hundred dollars ($100.00).
(2) Second violation: A second violation within the preceding twelve (12) calendar months is punishable by a fine not to exceed two hundred dollars ($200.00).
(3) Third violation: A third violation within the preceding twelve (12) calendar months is punishable by a fine not to exceed two hundred fifty dollars ($250.00).
(4) Fourth violation: A fourth violation is punishable by a fine not to exceed three hundred fifty dollars ($350.00).
(5) Fifth and subsequent violations: A fifth and subsequent violation is punishable by a fine not to exceed five hundred dollars ($500.00). a. Water flow restrictor: In addition to any fines, the City may install a water flow restrictor device of approximately one gallon per minute capacity for services up to one and one-half inch size and competitively sized restrictors for larger services after written notice of intent to install a restrictor for a minimum of forty-eight (48) hours.
DRAFT
Ordinance No. 1050
b. Termination of service: In addition to any fines and the installation of a water flow restrictor, the City may disconnect and/or terminate a customer’s water service.
(c) Cost of flow restrictor and disconnecting service: A person or entity that violates this ordinance is responsible for payment of the City charges for installing and/or removing any flow restricting device and for disconnecting and/or reconnecting service per the City’s schedule of charges, then in effect as a charge for installing and/or removing any flow restricting device shall be paid to the City before the device is removed. Nonpayment shall be subject to the same schedules as nonpayment of basic water rates. (d) Separate offenses: Once the City issues a violation for a particular offense, no further notice of violation will be issued for the same offense until such time as the penalty for the offense has been paid or the 10 day period to appeal has expired, whichever occurs first. If an appeal is timely filed after a violation is served, then no further notice of violation for the same offense will be issued until the appeal has been heard and a decision on that appeal rendered.
(e) Notice of hearing:
(1) The City shall issue a Notice of Violation by mail or personal delivery at least ten (10) days before taking enforcement action and said notice shall describe the action to be taken. A customer may appeal the Notice of Violation by filing a written notice of appeal with the City no later than the close of business on the day before the date scheduled for enforcement action.
Any Notice of Violation not timely appealed shall be final. Upon receipt of a timely appeal, a hearing on the appeal shall be scheduled in a timely manner, and the City shall mail written notice of the hearing to the customer at least ten (10) days before the date of the said hearing.
(2) Pending receipt of a written appeal or pending a hearing pursuant to an appeal, the City may take appropriate steps to prevent the unauthorized use of water as appropriate to the nature an extent of the violations and the current declared water Stage condition.
Section 2. Severability. If any section, subsection, sentence, clause or phrase in this ordinance or the application thereof to any person or circumstance is for any reason held invalid, the validity of the remainder of the ordinance or the application of such provision to other persons or circumstances shall be adopted thereby. The City Council hereby declares it would have passed this ordinance and each section, subsection, sentence, clause or phrase thereof, irrespective of the fact that one or more sections, subsections, sentences, clauses, or phrases or the application thereof to any person or circumstance be held invalid.
DRAFT
Ordinance No. 1050
Section 3. Effective Date. This Ordinance shall take effect thirty days after its adoption, shall be certified as to its adoption by the City Clerk, and shall be published once in the Paramount Journal within 15 days after its adoption together with the names and members of the City Council voting for and against the Ordinance.
PASSED, APPROVED, and ADOPTED by the City Council of the City of Paramount this 2nd day of September, 2014.
Diane J. Martinez, Mayor
ATTEST:
Lana Chikami, City Clerk
DRAFT
DRAFT
DRAFT
DRAFT
DRAFT
DRAFT
DRAFT
DRAFT
ORDINANCE NO. XXX
City of Paramount
Water Conservation Ordinance
DRAFT
June, 2011
Table of Contents
Water Conservation Ordinance
Section I: Title 1
Section II: Findings 1
Section III: Declaration of Purpose of Intent 2
Section IV: Definitions 2
Section V: Application 2
Section VI: Stage 1 Water Supply Shortage 3
Section VII: Stage 2 Water Supply Shortage 3
Section VIII: Stage 3 Water Supply Shortage 4
Section IX: Procedures, Determination and Notification 5 Section X: Hardship Waiver 6
Section XI: Penalties and Violations 7
Section XII: Severability 8
Section XIII: Effective Date 8
DRAFT
Ordinance No. TSD-67 Page 1
ORDINANCE NO. XXX
AN ORDINANCE OF THE CITY OF PARAMOUNT ESTABLISHING A WATER
CONSERVATION AND WATER SUPPLY SHORTAGE PROGRAM AND REGULATIONS Section I: Title
This ordinance will be known at the City of Paramount Water Conservation Program.
Section II: Findings
WHEREAS, a reliable minimum supply of potable water is essential to the public health, safety and welfare of the people and economy of the southern California region; WHEREAS, Southern California is a semi-arid region and is largely dependent upon imported water supplies. A growing population, climate change, environmental concerns and other factors in other parts of the State and western United States, make the region highly susceptible to water supply reliability issues;
WHEREAS, careful water management that includes active water conservation measures not only in times of drought, but at all times, is essential to ensure reliable minimum supply of water to meet current and future water supply needs;
WHEREAS, Article X, Section 2 of the California Constitution declares that the general welfare requires that water resources be put to beneficial use, waste or unreasonable use or unreasonable method of use of water be prevented, and conservation of water be fully exercised with a view to the reasonable and beneficial use thereof; WHEREAS, California Water Code Section 375 et seq. requires water suppliers to adopt and enforce a comprehensive water conservation program to reduce water consumption and conserve supplies;
WHEREAS, California Water Code section 350 et seq. authorizes any public entity, including a special district, to declare a water shortage emergency and, upon declaration of that emergency, adopt regulations and restrictions on the delivery and consumption of water in order to conserve water resources during the period of the emergency and until the supply of water available for distribution by the suppliers has been replenished or augmented; WHEREAS, the adoption and enforcement of water conservation and supply shortage program is necessary to manage the City’s potable water supply in the short- and long-term and to avoid or minimize the impacts of drought and shortage within the City. Such a program is essential to ensure a reliable and sustainable minimum supply of water for the public health, safety and welfare; and
WHEREAS, based upon the above findings, the City’s legal counsel advises, and the Board finds, that actions taken pursuant to this ordinance are categorically exempt from CEQA according to 14 California Code of Regulations 15301 and 15307.
DRAFT
Water Conservation Ordinance Page 2
NOW, THEREFORE, BE IT RESOLVED AND DETERMINED THAT THE
BOARD OF THE CITY OF PARAMOUNT DOES ORDAIN AS FOLLOWS:
Section III. Declaration of Purpose and Intent
a. The purpose of this ordinance is to establish a water conservation and supply shortage program that will reduce water consumption within the City through conservation, enable effective water supply planning, assure reasonable and beneficial use of water, prevent waste of water, and maximize the efficient use of water within the City to avoid and minimize the effect and hardship of water shortage to the greatest extent possible. b. This ordinance establishes three stages of water supply shortage response actions to be implemented during times of declared water shortage or declared water shortage emergency, with increasing restrictions on water use in response to worsening drought or decreasing supplies and emergency conditions.
Section IV. Definitions
a. The following words and phrases whenever used in this ordinance shall have the meaning defined in this section:
1. “City” means the City of Paramount.
2. “Landscape Irrigation System” means an irrigation system with pipes, hoses, spray heads, or sprinkling devices that are operated by hand or through an automated system.
3. “Person” means any natural person or persons, corporation, public or private entity, governmental agency or institution or any other user of water provided by the City.
4. “Potable Water” means water which is suitable for drinking.
5. “Recycled Water” means the reclamation and reuse of non-potable water for beneficial use.
Section V. Application
a. The provisions of this ordinance apply to any person in the use of any potable water provided by the City.
b. The provisions of this ordinance do not apply to uses of water necessary to protect public health and safety or for essential government services, such as police, fire and other similar emergency services.
c. The provisions of this ordinance do not apply to the use of recycled water. d. The provisions of this ordinance do not apply to the use of water by commercial nurseries and commercial growers to sustain plants, trees, shrubs, crops or other vegetation intended for commercial sale.
e. This ordinance is intended solely to further the conservation of water. It is not intended to implement any provision of federal, state, or local statutes, ordinances, or regulations relating to protection of water quality or control of drainage or runoff. Refer to the local jurisdiction or Regional Water Quality Control Board for information on any state based ordinances and stormwater management plans.
DRAFT
Water Conservation Ordinance Page 3
Section VI: Stage 1 Water Supply Shortage
a. A Stage 1 Water Supply Shortage condition exists when the City determines, in its sole discretion, that due to drought or other supply reductions, a consumer demand reduction is required in order to ensure that sufficient supplies will be available to meet anticipated demands. Upon the declaration of a Stage 1 Water Supply Shortage condition, the City shall implement the mandatory Stage 1 conservation measures identified in this section.
These requirements are in addition to the water conservation items stated in the Waste Water Ordinance.
b. Water Conservation Measures: The following water conservation requirements apply during a declared Stage 1 Water Supply Shortage:
1. Limits on Watering: Watering or irrigation of lawn, landscape or other vegetated area with potable water is limited to 3 days per week. During the months of November through March, watering or irrigation of lawn, landscape or other vegetated area with potable water is limited to no more than 2 days per week. This provision does not apply to landscape irrigation systems that exclusively use very low-flow drip type irrigation systems when no emitter produces more than 2 gallons of water per hour. This provision does not apply to use of a hand-held bucket or similar container, a hand-held hose equipped with a positive self closing water shutoff device, or for very short periods for the express purpose of adjusting or repairing an irrigation system.
2. Obligation to Fix Leaks, Breaks or Malfunctions: All leaks, breaks, or other malfunctions in the water user’s plumbing, distribution, or irrigation system must be remedied within seventy two (72) hours of observation and/or notification by the City.
3. No Excessive Water Flow or Run-Off: Watering or irrigation of any lawn, landscape or other vegetated area in a manner that causes or allows excessive water flow or runoff onto an adjoining sidewalk, driveway, street, alley, gutter or ditch must be must be repaired within 5 days of observation and/or notification by the City.
4. No Washing Down Hard or Paved Surfaces: Washing down hard or paved surfaces, including but not limited to sidewalks, walkways, driveways, parking areas, tennis courts, patios or alleys is prohibited except when necessary to alleviate safety or sanitary hazards and only by use of a hand-held bucket or similar container, a lowvolume high pressure cleaning machine equipped to recycle any water used or a low volume high pressure water broom.
5. Re-Circulating Water Required for Water Fountains and Decorative Water Features:
Operating a water fountain or other decorative water feature that does not use recirculating water is prohibited.
6. Limits on Washing Vehicles: Using water to wash or clean a vehicle including but not limited to any automobile, truck, van, bus, motorcycle, boat or trailer whether motorized or not is prohibited, except by use of a hand-held bucket or similar container or a hand-held hose equipped with a positive self closing water shut-off nozzle or device.
7. Drinking Water Served Upon Request Only: Restaurants are prohibited from providing drinking water to any person unless expressly requested by that person.
8. Use only recycled water for construction site dust control, consolidation of backfill.
DRAFT
Water Conservation Ordinance Page 4
9. Other Prohibited Uses: The Board of Directors may implement other prohibited water uses as determined by the City after notice to customers.
Section VII. Stage 2 Water Supply Shortage
a. A Stage 2 Water Supply Shortage condition exists when the City determines, in its sole discretion, that due to drought or other supply reductions a consumer demand reduction is required in order to ensure that sufficient supplies will be available to meet anticipated demands. Upon the declaration of a Stage 2 Water Supply Shortage condition, the City shall implement the mandatory Stage 2 conservation measures identified in this section. b. Conservation Measures: In addition to the prohibited uses of water identified in Section VI, the following additional water conservation requirements apply during a declared Stage 2 Water Supply Shortage:
1. Limits on Watering: Watering or irrigation of lawn, landscape or other vegetated area with potable water is limited to 2 days per week. During the months of November through March, watering or irrigation of lawn, landscape or other vegetated area with potable water is limited to no more than 1 day per week. This provision does not apply to landscape irrigation systems that exclusively use very low-flow drip type irrigation systems when no emitter produces more than 2 gallons of water per hour. This provision does not apply to use of a hand-held bucket or similar container, a hand-held hose equipped with a positive self closing water shutoff device, or for very short periods for the express purpose of adjusting or repairing an irrigation system.
2. Obligation to Fix Leaks, Breaks or Malfunctions: All leaks, breaks, or other malfunctions in the water user’s plumbing, distribution, or irrigation system must be remedied within forty eight (48) hours of observation and/or notification by the City.
3. No filling, cleaning and/or refilling of decorative fountains, ornamental lakes or ponds except to the extent needed to sustain aquatic life, provided that such animals have been actively managed within the water feature prior to declaration of this supply shortage stage.
4. Residential car washing prohibited. Use car washes available with water recycling systems.
5. The filling or topping off of any new or existing residential pools or outdoor spas is prohibited.
6. Planting of new turf grass is prohibited.
7. Outdoor evaporative mist coolers are prohibited.
8. Main line flushing is allowed for emergency purposes only.
9. Other Prohibited Uses: The City may implement other prohibited water uses as determined by the Board of Directors, after notice to Customers.
Section VIII. Stage 3 Water Supply Shortage – Emergency Condition a. A Stage 3 Water Supply Shortage condition is also referred to as an “Emergency” condition. A Stage 3 Water Supply Shortage condition exists when the City declares a water shortage emergency in a manner and upon the grounds set forth in California Water Code Section 350 et seq.
DRAFT
Water Conservation Ordinance Page 5
Upon the declaration of a Stage 3 Water Supply Shortage condition pursuant to California Water Code Section 350 et seq., the City will implement the mandatory Stage 3 conservation measures identified in this section.
b. Additional Conservation Measures: In addition to the prohibited uses of water identified in Sections VI and VII the following water conservation requirements apply during a declared Stage 3 Water Supply Shortage Emergency:
1. Limited Watering or Irrigating: Watering or irrigating of lawn, landscape or other vegetated area with potable water is restricted in accordance with allotments as set forth by the City during a Stage 3 Water Supply Shortage. This restriction does not apply to the use of recycled water or to the following categories of use, subject to the hardship waiver provisions as described in Section X:
a. Maintenance of existing landscape necessary for fire protection; b. Maintenance of existing landscape for soil erosion control; c. Maintenance of plant materials identified to be rare or essential to the wellbeing of protected species; d. Maintenance of landscape within active public parks and playing fields, daycare centers, golf course greens, and school grounds, provided that such irrigation does not exceed 2 days per week;
e. Actively irrigated environmental mitigation projects.
2. Obligation to Fix Leaks, Breaks or Malfunctions: All leaks, breaks, or other malfunctions in the water user’s plumbing, distribution, or irrigation system must be remedied within twenty four (24) hours of observation and/or notification by the City.
3. Other Prohibited Uses: The City may implement other prohibited water uses as determined by the Board of Directors, after notifying customers.
Section IX. Procedures for Determination/Notification of Water Supply Shortage a. Determination and notification of a Stage 1 or Stage 2, Water Supply Shortage condition:
The existence of a Stage 1 or Stage 2 Water Supply Shortage condition will be declared by resolution of the Board adopted at a regular or special public meeting held in accordance with State law. The mandatory conservation measures applicable to Stage 1 and Stage 2 Water Supply Shortage conditions, respectively, shall take effect on the tenth day after the date the shortage condition is declared. Within five days following the declaration of the shortage condition, the City shall publish a copy of the resolution once in a newspaper used for publication of official notices.
If the Board of Directors establishes a water allocation, the City shall provide notice of the allocation by including it in the regular billing statement or by another mailing to the address to which the City customarily mails the billing statement for fees or charges for ongoing water service. A water allocation shall be effective on the fifth day following the date of mailing or at such later date as specified in the notice. b. Determination and notification of a Stage 3 Water Supply Shortage condition (“Emergency” condition): The existence of a Stage 3 Water Supply Shortage condition may be declared in accordance with the requirements and procedures specified in California Water Code Section 350 et seq.
The mandatory conservation measures applicable to a Stage 3 Water Supply Shortage condition shall take effect immediately upon the Board of Directors declaration of a “Water DRAFT
Water Conservation Ordinance Page 6
Shortage Emergency” pursuant to California Water Code Section 350 et seq. As soon as practicable following the Board’s declaration of a “Water Shortage Emergency,” the City shall publish a copy of the declaration once in a newspaper used for publication of official notices.
If the Board of Directors establishes a water allocation, the City shall provide notice of the allocation by including it in the regular billing statement or by another mailing to the address to which the City customarily mails the billing statement for fees or charges for ongoing water service. A water allocation shall be effective on the fifth day following the date of mailing or at such later date as specified in the notice.
Section X. Hardship Waiver
a. Undue and Disproportionate Hardship: If, due to unique circumstances, a specific requirement of this ordinance would result in undue hardship to a person using water or to property upon which water is used, that is disproportionate by the impacts to water users generally or to similar property or classes of water users, then the person may apply for a waiver to the requirements as provided in this section. b. Written Finding: The waiver may be granted or conditionally granted only upon a written finding of the existence of facts demonstrating an undue hardship to a person using water or to property upon which water is used, that is disproportionate to the impacts to water users generally or to similar property or classes of water use due to specific and unique circumstances of the user or the user’s property:
1. Application: Application for a waiver shall be on a form prescribed by the City and shall be accompanied by a non-refundable processing fee in an amount set by resolution of the Board.
2. Supporting Documentation: The application may be accompanied by photographs, maps, drawing and other information, including a written statement of the applicant.
3. Required Findings for Variance: An application for a waiver shall be denied unless the appropriate authority finds, based in the information provided in the applications, supporting documents, or such additional information as may be requested, and on water use information for the property as shown by the records of the City or its Agent, all of the following:
a. That the waiver does not constitute a grant of special privilege inconsistent with the limitations upon other residents and businesses; b. That because of special circumstances applicable to the property or its use, the strict application of this ordinance would have a disproportionate impact on the property or use that exceeds the impacts to similarly situated residences and businesses;
c. That the authorizing of such waiver will not be of substantial detriment to adjacent properties, and will not materially affect the ability of the City to effectuate the purpose of this ordinance and will not be detrimental to the public interest; and
d. That the condition or situation of the subject property or the intended use of the property for which the waiver is sought is not common or general in nature.
4. Approval Authority: The City Manager (or designee) shall exercise approval authority and act upon any completed application no later than ten (10) days after submittal and may approve, conditionally approve, or deny the waiver. The applicant DRAFT
Water Conservation Ordinance Page 7
requesting the waiver shall be promptly notified in writing of any action taken.
Unless specified otherwise at the time a waiver is approved the waiver applies to the subject property during the term of the mandatory water supply shortage condition.
5. Appeals to the Board: An applicant can appeal a decision or condition to the City Manager on a waiver application to the City of Paramount within 10 days of the decision upon written request for a hearing. The request shall state the grounds for the appeal. At a public meeting, the City of Paramount shall act as the approval authority and review the appeal following the regular waiver procedure. The decision of the City of Paramount is final.
Section XI. Penalties and Violations
a. Misdemeanor: Any violation of City ordinances may be prosecuted as a misdemeanor punishable by imprisonment in the county jail for not more than thirty (30) days, or by a fine not exceeding one thousand dollars ($1,000), or by both. b. Civil Penalties: Civil penalties for failure to comply with any provisions of the ordinance shall be as follows:
Stage 1
1. First Violation: The City shall issue a written courtesy door hanger describing the violation and deliver a copy of this ordinance by mail.
2. Second Violation: A second violation within the preceding twelve (12) calendar months is punishable by a fine not to exceed one hundred dollars ($100.00).
3. Third Violation: A third violation within the preceding twelve (12) calendar months is punishable by a fine not to exceed one hundred and fifty dollars ($150.00).
4. Fourth Violation: A fourth violation is punishable by a fine not to exceed two hundred dollars ($200.00).
5. Fifth and Subsequent Violations: A fifth and subsequent violation is punishable by a fine not to exceed two hundred and fifty dollars ($250.00). a. Water Flow Restrictor: In addition to any fines, the City may install a water flow restrictor device of approximately one gallon per minute capacity for services up to one and one-half inch size and competitively sized restrictors for larger services after written notice of intent to install a restrictor for a minimum of forty-eight (48) hours.
Stages 2 & 3
1. First Violation: The first violation is punishable by a fine not to exceed one hundred dollars ($100.00).
2. Second Violation: A second violation within the preceding twelve (12) calendar months is punishable by a fine not to exceed two hundred dollars ($200.00).
3. Third Violation: A third violation within the preceding twelve (12) calendar months is punishable by a fine not to exceed two hundred fifty dollars ($250.00).
4. Fourth Violation: A fourth violation is punishable by a fine not to exceed three hundred fifty dollars ($350.00).
5. Fifth and Subsequent Violations: A fifth and subsequent violation is punishable by a fine not to exceed five hundred dollars ($500.00).
a. Water Flow Restrictor: In addition to any fines, the City may install a water flow restrictor device of approximately one gallon per minute capacity for DRAFT
Water Conservation Ordinance Page 8
services up to one and one-half inch size and competitively sized restrictors for larger services after written notice of intent to install a restrictor for a minimum of forty-eight (48) hours.
b. Termination of Service: In addition to any fines and the installation of a water flow restrictor, the City may disconnect and/or terminate a customer’s water service.
c. Cost of Flow Restrictor and Disconnecting Service: A person or entity that violates this ordinance is responsible for payment of the City charges for installing and/or removing any flow restricting device and for disconnecting and/or reconnecting service per the City’s schedule of charges, then in effect as a charge for installing and/or removing any flow restricting device shall be paid to the City before the device is removed. Nonpayment shall be subject to the same schedules as nonpayment of basic water rates. d. Separate Offenses: Once the City issues a violation for a particular offense, no further notice of violation will be issued for the same offense until such time as the penalty for the offense has been paid or the 10 day period to appeal has expired, whichever occurs first. If an appeal is timely filed after a violation is served, then no further notice of violation for the same offense will be issued until the appeal has been heard and a decision on that appeal rendered.
e. Notice of Hearing:
1. The City shall issue a Notice of Violation by mail or personal delivery at least ten (10) days before taking enforcement action and said notice shall describe the action to be taken. A customer may appeal the Notice of Violation by filing a written notice of appeal with the City no later than the close of business on the day before the date scheduled for enforcement action. Any Notice of Violation not timely appealed shall be final. Upon receipt of a timely appeal, a hearing on the appeal shall be scheduled in a timely manner, and the City shall mail written notice of the hearing to the customer at least ten (10) days before the date of the said hearing.
2. Pending receipt of a written appeal or pending a hearing pursuant to an appeal, the City may take appropriate steps to prevent the unauthorized use of water as appropriate to the nature an extent of the violations and the current declared water Stage condition.
Section XII. Severability
If any section, subsection, sentence, clause or phrase in this ordinance or the application thereof to any person or circumstance is for any reason held invalid, the validity of the remainder of the ordinance or the application of such provision to other persons or circumstances shall be adopted thereby. The Board of Directors hereby declares it would have passed this ordinance and each section, subsection, sentence, clause or phrase thereof, irrespective of the fact that one or more sections, subsections, sentences, clauses, or phrases or the application thereof to any person or circumstance be held invalid.
Section XIII. Effective Date
This Ordinance is effective upon adoption.
PASSED, APPROVED AND ADOPTED this ___ day of __________, 20__.
DRAFT
Appendix H
Submittal Tables
DRAFT
CA1910105
Paramount -- City, Water
Department
7,556 5,122
7,556 5,122
Submittal Table 2-1 Retail: Public Water Systems
Add additional rows as needed
NOTES:
Volume of Water
Supplied 2025 (AF)
DWR NOTES:
Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3.
Total
Public Water System
Number
Public Water System
Name
Number of Municipal
Connections 2025
DRAFT
Select One
Name of Regional Alliance or
RUWMP (Drop Down List)
NOTES:
Submittal Table 2-2: Plan Identification
Type of Plan
Individual UWMP
If Water Supplier is also a member of a SB X7-7
Regional Alliance, select name from the drop-down.
Regional Urban Water Management Plan (RUWMP)
If Supplier selected RUWMP, select name from the
drop-down.
DRAFT
Supplier is a wholesale supplier
Supplier is a retail supplier
UWMP Tables are in calendar years
UWMP Tables are in fiscal years
Unit AF
Submittal Table 2-3: Supplier Identification
Type of Supplier (select one or both)
Fiscal or Calendar Year (select one)
If using fiscal years provide month and date that the fiscal year begins (mm/dd)
Units of measure used in UWMP
(Select from the drop down list).
DWR NOTES:
Units of measure (AF, CCF, MG) must remain consistent
throughout the UWMP as reported in Submittal Table 2-3.
NOTES:
DRAFT
Submittal Table 2-4 Retail: Water Supplier Information Exchange Water Code Section 10631(h)
The retail Supplier has informed the following wholesale supplier(s) of projected water use.
Wholesale Water Supplier Name
Add additional rows as needed
Central Basin Municipal Water District
NOTES:
10631(h) An urban water supplier that relies upon a wholesale agency for a source of water shall provide the wholesale agency with water use projections from that agency for that source of water in five-year increments to 20 years or as far as data is available.
DRAFT
2025 2030 2035 2040 2045 2050(opt)
52,371 53,962 55,602 57,292 59,033
Submittal Table 3-1 Retail: Population - Current and Projected Water Code Section 10631(a)
Population
Served
NOTES:
CWC 10631(a) describe the current and projected population of the service area including current and projected population…
DRAFT
Use Type
Drop down list
May select each use multiple times
These are the only use types that will be recognized
by the WUEdata online submittal tool
Potable or Non-Potable
(OPTIONAL)
Drop down list
Volume (AF)
Single Family Potable 1,172
Multi-Family Potable 2,253
Commercial Potable 525
Landscape Potable 105
Agricultural Potable 47
Industrial Potable 508
Other (optional) Potable 365
Distribution System Water Loss Potable 147
5122
0 Total 5,122
Submittal Table 4-1 Retail: Total Uses for Potable and Non-Potable Water — Actual Water Code Section 10631(d)(1)
NOTES:
DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3. 2025 Actual Water Use
Add additional rows as needed
Subtotal Potable
Subtotal Non-Potable
Additional Description
(as needed)
DRAFT
DRAFT
Use Type
Drop down list
May select each use multiple times
These are the only Use Types that will be
recognized by the WUEdata online
submittal tool
Potable or NonPotable
(OPTIONAL)
Drop down list
2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF) 2050 opt (AF)
Single Family Potable 1,266 1,305 1,345 1,385Multi-Family Potable 2,437 2,511 2,587 2,666Commercial Potable 567 585 602 621Landscape Potable 550 566 584 601Agricultural Potable 114 117 121 125Industrial Potable 51 52 54 55Other (optional) Potable 395 407 419 432Distribution System Water Loss Potable 147 147 147 147 5,527 5,690 5,859 6,032 0
0 0 0 0 0
5,527 5,690 5,859 6,032 0
Add additional rows as needed.
Submittal Table 4-2 Retail: Total Uses for Potable, and Non-Potable Water — Projected Water Code Section 10631(d)(1)
Projected Water Use
(Report To the Extent that Records are Available)
Additional
Description
(as needed)
NOTES:
Total
DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3.
Subtotal Non-Potable
Subtotal Potable
DRAFT
DRAFT
Are Future Water Savings Included in Projections?
Drop down list (y/n) No
If "Yes" to above, state the section or page number, in the cell to the right, where citations of the codes, ordinances, or otherwise are utilized in demand projections are found.
Optional Suppliers may complete Optional Submittal Table 4-4 R to quantify the expected savings.
Are Lower Income Residential Demands Included In Projections? Drop down list (y/n) No
Optional If the method for accounting Lower Income Residential Demands has been included, provide page number where this accounting can be found.
CWC10631 (d) (4) (A) Water use projections, where available, shall display and account for water savings estimated to result from adopted codes, standards, ordinances, or transpotation and land use plans identified by the urban water supplier, as applicable to the service area.
CWC 10631 (d) (4) (B) to the extent that an urban water supplier reports the information described in subparagraph (A), an urban water supplier shall do both of the following: (i) Provide citations of the various codes, standards, ordinances or transportation and land use plans utilized in making the projections. (ii) Indicate the extent that the water use projections consider savings from codes, standards, ordinances, or transportation and land use plans. Water use projections that do not account for these water savings shall be noted of that fact.
CWC 10631(a) Water use projections required by section 10631 shall include projected water use for single-family and multifamily residential housing needed for lower income households, as identified in the housing element of any city, county, or city and county, in the service area of the supplier .
Submittal Table 4-3 Retail: Inclusion in Water Use Projections Water Code Section 10631 (a), 10631 (d)(4)(A), and 10631 (d)(4)(B) NOTES:
DWR NOTES: Additional guidance is provided in Appendix K.
DRAFT
Public Water System ID # Reported
in Table 2-1 R Reporting Period Submitted to DWR Water Loss Audit Program (yes/no) 2020 Yes
2021 Yes
2022 Yes
2023 Yes
2024 Yes
CWC 10631(d)(3) (A) The distribution system water loss shall be quantified for each of the five years preceding the plan update, in accordance with rules adopted pursuant to Section 10608.34.
Submittal Table 4-5 Retail: Water Loss Audit Reporting
Water Code Section 10631(d)(3)(A)
DWR NOTES: Suppliers will provide a link to the WUEdata submittals of their Water Loss Audit Reports.
NOTES:
Report submittal status for all five years for each Public Water System as available.
Add rows as needed
DRAFT
2028 Real Water
Loss Standard per
Unit per day
Units for Real
Water Loss
Drop down list
Number of Units
(Connections or
Miles corresponding
with units selected)
Volume of Total Real
Loss
(from AWWA Water
Loss Audit)
(AF)
2028 Apparent
Water Loss
Standard per Unit
per Day
Units for
Apparent Water
Loss
Number of
Connections
Volume of Total
Apparent Loss
(from AWWA Water
Loss Audit)
(AF)
CA1910105 Yes 61.8
Gallons per
Service
Connection per
Day (GPSCD)
7,556 74.9 8.9 13.6
Gallons per
Service
Connection per
Day (GPSCD)
7,556 71.9 8.5
Submittal Table 4-6 Retail: Progress Towards 2028 Water Loss Standard Water Code Section 10631(d)(3)(C) NOTES:
Apparent Water Loss
Did the Water Board
Calculate a Water Loss
Standard for this Public
Water System? (y/n)
If no, Supplier will not
complete this row.
Real Water Loss
Water Board's Calculated Water Loss Standards
DWR NOTES: Units of measure (AF, CCF, MG) for Water Loss MUST remain consistent with units reported in Submittal Table 2-3. The units reported in Submittal Table 2-3 are used in this table's calculations.
Public Water
System ID # Reported in
Submittal Table
2-1 R
Add additional rows as needed.
Most Recent AWWA Water Loss Audit
Real Water
Loss Per Unit
per Day
Most Recent AWWA Water Loss Audit
Apparent Water
Loss Per Unit per
Day
State Water Board Standard State Water Board Standard
DRAFT
Actual 2025 GPCD
(From SB X7-7
Compliance Form)
Did Supplier meet the
2020 Target in 2025?
No Individual Target 114 89 Yes NA
10608.40 Urban water retail suppliers shall report to the department on their progress in meeting their urban water use targets as part of their urban water management plans submitted pursuant to Section 10631.Submittal Table 5-1 Retail: SB X7-7 2020 Target Progress Water Code Section 10608.40NOTES:
Did Supplier
Achieve Targeted
Reduction for
2020?
2020 Target Actual 2020 GPCD
Regional Alliance
Target or
Individual Target?
Drop down list
DWR NOTES: Suppliers calculating a 2025 GPCD will need to complete and submit SB X 7-7 Compliance Tables to verify the use of SB X7-7 Methodologies. Suppliers that were part of a merger or consolidation since 2020 see Chapter 5 and Appendix P for guidance. NA=Not Applicable Check the box if the Supplier was not an Urban Water Supplier during or before the 2020 UWMP reporting cycle. Proceed to the next table.
Only for suppliers that did not meet the
Target in 2020
See DWR NOTES below.
Was Supplier part of a
merger or
consolidation since
2020?
DRAFT
Groundwater Type
Drop Down List
May use each category
multiple times
Potable or
Non-Potable
(OPTIONAL)
Drop down list
Location or Basin Name 2021 (AF) 2022 (AF) 2023 (AF) 2024 (AF) 2025 (AF) Alluvial Basin Potable Central Basin 3,166 2,106 2,712 2,812 2,779 3,166 2,106 2,712 2,812 2,779
Add additional rows as needed
10631(4) If groundwater is identified as an existing or planned source of water available to the supplier, all of the following information:(C) A detailed description and analysis of the location, amount, and sufficiency of groundwater pumped by the urban water supplier for the past five years. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.
Submittal Table 6-1 Retail: Groundwater Volume PumpedWater Code Section 10631(4) and 10631(4)(c) DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3.NOTES
Total
Check the box if the Supplier does not pump groundwater.
Proceed to the next table. Check the box if all or part of the groundwater described below is desalinated. (OPTIONAL) DRAFT
Name of
Wastewater
Collection
Agency
Wastewater
Volume Metered
or Estimated?
OPTIONAL
Drop Down List
Volume of Wastewater
Collected from UWMP
Service Area 2025 (AF)
Name of Wastewater
Treatment Plant (WWTP) and
Place ID Number
Drop down list
Is WWTP
Located Within
UWMP Area?
Drop Down List
LACSD Estimated 139
A.K. Warren Water Resource
Facility, Place ID 234156 No
LACSD Estimated 139
Whittier Narrows Water
Reclamation Plant, Place ID
235826
No
LACSD Estimated 139
Los Coyotes WRP, Place ID
238646
No
LACSD Estimated 139
San Jose Creek Water
Reclamation Plant, Place ID
260156
No
LACSD Estimated 139
Long Beach WRP, Place ID
238562
No
LACSD Estimated 139
Pomona Water Reclamation
Plant, Place ID 250700 No
LACSD Estimated 139
La Canada WWRP, Place ID
237748
No
973
Check the box if there is no wastewater collection system.
Proceed to the next table.
NOTES:
Submittal Table 6-2 Retail: Wastewater Collected Within Service Area Water Code Section 10633(a)
Percentage of 2025 service area population served by wastewater collection system (OPTIONAL)
Percentage of 2025 service area served by wastewater collection system (OPTIONAL) DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3.
Additional Guidance: See Appendix M, Section M.21 for detailed guidance on this table.
Wastewater Collection Recipient of Collected Wastewater Total Wastewater Received from
UWMP Service Area in 2025:
Add additional rows as needed
DRAFT
Treatment Level
Drop down list
Volume
(AF)
Treatment Level
Drop down list
Volume
(AF)
Treatment Level
Drop down list
Volume
(AF)
Treatment Level
Drop down list
Volume
(AF)
Treatment Level
Drop down list
Volume
(AF)
Name of other
entity
A.K. Warren Water
Resource Facility, Place
ID 234156
Yes 139 139
Whittier Narrows Water
Reclamation Plant, Place
ID 235826
Yes 139 139 Secondary, Undisinfected
Los Coyotes WRP, Place
ID 238646
Yes 139 139 Secondary, Disinfected - 23
San Jose Creek Water
Reclamation Plant, Place
ID 260156
Yes 139 139
Long Beach WRP, Place
ID 238562
Yes 139 139
Pomona Water
Reclamation Plant, Place
ID 250700
Yes 139 139
La Canada WWRP, Place
ID 237748
Yes 139 139
973 973 0 0 0 0 0
Submittal Table 6-3 Retail: Wastewater Treatment and Outcomes Within UWMP Service AreaWater Code Section 10633(b) DWR NOTES:Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3.
IPR: Indirect Potable Reuse would have the treatment level of its end use requirement in the Level of Treatment drop-down.
Additional Guidance: See Appendix M, Section M.21 for detailed guidance on this table.
Water Recycled Outside of
UWMP Service Area
(enter data as applicable)
Effluent Discharge that is
not a Permitted Recycled
Water Use
(enter data as applicable)
Required Discharge for
Instream Flow
(enter data as applicable)
Delivered to Another Entity for Additional
Treatment
(enter data as applicable)
Add additional rows as needed
2025 Outcomes of Treated Wastewater
Check the box if no wastewater is treated or disposed of within the UWMP service area. Proceed to the next table.
Does This Plant
Treat
Wastewater
Generated
Outside the
UWMP Service
Area?
(OPTIONAL)
Drop down list
Wastewater Treatment
Plant Name and Place ID
Number
Drop down list
Total 2025
Volume of
Water
Treated (AF)
NOTES:
Total
2025 Volume of
Wastewater
Received from
UWMP Service
Area
(As Reported in
Submittal Table
6-2 R) (AF)
Water Recycled Within
UWMP Service Area
(enter data as applicable)
DRAFT
Volume Narrative page number (OPTIONAL)
Landscape irrigation (exc golf
courses) Non-Potable 253 253 253 253 253
Industrial use Non-Potable 13 13 13 13 13
0 0 0 0 0 0 0
266 266 266 266 266 0 0
266 266 266 266 266 0 0 0
10633. The plan shall provide, to the extent available, information on recycled water and its potential for use as a water source in the service area of the urban water supplier... and shall include...
(c) A description of the recycled water currently being used in the supplier’s service area, including, but not limited to, the type, place, and quantity of use d) A description and quantification of the potential uses of recycled water, including, but not limited to, agricultural irrigation, landscape irrigation, wildlife habitat enhancement, wetlands, industrial reuse, groundwater recharge, indirect potable reuse, and other appropriate uses, and a determination with regard to the technical and economic feasibility of serving those uses.(e) The projected use of recycled water within the supplier’s service area at the end of 5, 10, 15, and 20 years, and a description of the actual use of recycled water in comparison to uses previously projected pursuant to this subdivision.
Total
Use Type
Drop down list
Potable or Non-Potable
(after treatment if treated)
(OPTIONAL)
Drop down list
Additional Information
(as needed)
Add additional rows as neededDWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3.
Additional Guidance: See Appendix M, Section M.21 for detailed guidance on this table. Potential recycled water use: a description of the feasibility of these uses must be included in the narrative.Multiple Producers: If you have multiple recycled water producers, submit a separate table for each.NOTES:
2025 (AF) 2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF) 2050 (AF) Subtotal Potable
Subtotal Non-Potable
Check box if recycled water is not used and is not planned for use within the service area of the supplier. The supplier will only complete the column on "Potential Recycled Water Use" and submit an accompanying narrative on the feasibility of that potential recycled water use.
Submittal Table 6-4 Retail: Recycled Water Direct Beneficial Uses Within Service AreaWater Code Section 10633 (c),(d),(e) Potential Recycled Water Use
Name(s) of Facility/ies Producing (Treating) the Recycled Water (OPTIONAL) : LACSDName of Supplier Operating the Recycled Water Distribution System (OPTIONAL) : Central Basin MWD Volume of Supplemental Water Added in 2025 (OPTIONAL) : 0 Source of 2025 Supplemental Water (OPTIONAL) :
DRAFT
2020 Projection
for 2025 (AF)
2025 Actual
Use (AF)
245 253
44 0
23 13
312 266
Submittal Table 6-5 Retail: 2020 UWMP Recycled Water Use Projection Compared to 2025 Actual
Water Code Section 10633(e)
Check the box if recycled water was not used in 2025 nor previously projected for use in 2020.
Proceed to the next table.
Add additional rows as needed
Landscape irrigation (exc golf courses)
NOTES:
Total
DWR NOTES:
Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure reported in Submittal Table 2-3 Additional Guidance: See Appendix M, Section M.21 for detailed guidance on this table.
Use Type
Drop Down list
10633. The plan shall provide, to the extent available, information on recycled water and its potential for use as a water source in the service area of the urban water supplier. The preparation of the plan shall be coordinated with local water, wastewater, groundwater, and planning agencies that operate within the supplier’s service area, and shall include all of the following: (e) ...a description of the actual use of recycled water in comparison to uses previously projected pursuant to this subdivision
Golf course irrigation
Industrial use
DRAFT
Name of Action Description Expected Increase in Recycled Water Use (AF) 0 0
Total (AF)
10633. The plan shall provide, to the extent available, information on recycled water and its potential for use as a water source in the service area of the urban water supplier. The preparation of the plan shall be coordinated with local water, wastewater, groundwater, and planning agencies that operate within the supplier’s service area, and shall include all of the following:
(f) a description of actions, including financial incentives, which may be taken to encourage the use of recycled water, and the projected results of these actions in terms of acre feet of recycled water used per year.
DWR NOTES:
Units of measure (AF, CCF, MG) MUST remain consistent with units reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3.The unit conversion to Acre Feet addresses the Water Code's requirement that this value be provided in acre-feet. NOTES:
Submittal Table 6-6 Retail: Methods to Encourage Future Recycled Water UseWater Code Section 10633(f) Check the box if the Supplier does not plan to expand recycled water use in the future. Supplier will not complete the table below but will provide narrative explanation. Provide page location of narrative in the UWMP Add additional rows as needed
Unit Conversion to AF
Planned Implementation Year
DRAFT
Drop Down
List
(yes/no)
If Yes, Supplier
Name
Planned for Use in
Year Type
Drop Down List
NOTES:
Submittal Table 6-7 Retail: Expected Future Water Supply Projects or ProgramsWater Code Section 10631(f) DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure reported in Submittal Table 2-3.
Check the box if some or all of the supplier's future water supply projects or programs are not compatible with this table and are described in a narrative format. Check the box if there are no expected future water supply projects or programs that provide a quantifiable increase to the agency's water supply.Proceed to the next table.
Planned
Implementation
Year
Add additional rows as needed
Joint Project with other
suppliers? Expected
Increase in
Water Supply
to Supplier
(This may be a
range) (AF)
Provide page location of narrative in the UWMP
Name of Future
Projects or
Programs
Additional
Description
(as needed)
Potable or Non-Potable
(after treatment if treated)
(OPTIONAL)
Drop Down list
DRAFT
Water Supply
Drop down list
May use each category multiple times.
These are the only water supply
categories that will be recognized by the
WUEdata online submittal tool
Potable or Non-Potable
(after treatment if treated)
(OPTIONAL)
Drop Down list
Actual Volume
(AF)
Total Entitlement
(OPTIONAL)
See 'DWR Notes' below
(AF)
Groundwater (not desalinated) CBMWD Potable 4,583 5,883 Other (optional) Carryover Potable 0 3,530
Purchased or Imported Water CBMWD Potable 539
Recycled Water CBMWD Non-Potable 278
5,122 9,413
278 0
5,400 9,413
10631. A plan shall be adopted in accordance with this chapter that shall do all of the following... (b) Identify and quantify, to the extent practicable, the existing and planned sources of water available to the supplier over the same five-year increments described in subdivision (a), providing supporting and related information...
Submittal Table 6-8 Retail: Water Supplies — ActualWater Code Section 10631(b) 2025
NOTES:DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table identifies the unit of measure selected in Submittal Table 2-3.Total Entitlement: e.g. Water Right, Groundwater Allocation, Contracted Amount.
Add additional rows as needed
Total
Subtotal Potable
Subtotal Non-Potable
Additional Description
(as needed)
DRAFT
Water Supply
Reasonably
Available
Volume (AF)
Total Entitlement
(OPTIONAL)
See 'DWR Notes'
below (AF)
Reasonably
Available
Volume (AF)
Total Entitlement
(OPTIONAL)
See 'DWR Notes'
below (AF)
Reasonably
Available
Volume (AF)
Total Entitlement
(OPTIONAL)
See 'DWR Notes'
below (AF)
Reasonably
Available
Volume (AF)
Total Entitlement
(OPTIONAL)
See 'DWR Notes'
below (AF)
Reasonably
Available
Volume (AF)
Total Entitlement
(OPTIONAL)
See 'DWR Notes'
below (AF)
Groundwater (not
desalinated) CBMWD Potable 5,883 5,883 5,883 5,883 5,883 5,883 5,883 5,883 5,883 5,883 Other (optional) Carryover Potable 2,664 3,530 2,664 3,530 2,664 3,530 2,664 3,530 2,664 3,530 Purchased or Imported Water CBMWD Potable 500 500 500 500 500 Recycled Water CBMWD Non-Potable 338 338 338 338 338
9,047 9,413 9,047 9,413 9,047 9,413 9,047 9,413 9,047 9,413 338 0 338 0 338 0 338 0 338 0
9,385 9,413 9,385 9,413 9,385 9,413 9,385 9,413 9,385 9,413 Submittal Table 6-9 Retail: Water Supplies — ProjectedWater Code Section 10631 (b) Projected Water Supply (Report to the Extent Practicable) Drop down list
May use each category multiple
times. These are the only water
supply categories that will be
recognized by the WUEdata online
submittal tool
Additional
Detail on
Water Supply
Potable or Non-Potable
(after treatment if treated)
(OPTIONAL)
Drop Down list
10631. A plan shall be adopted in accordance with this chapter that shall do all of the following... (b) Identify and quantify, to the extent practicable, the existing and planned sources of water available to the supplier over the same five-year 2050 (opt)
Add additional rows as needed
Total
NOTES:
2030 2035 2040 2045
Subtotal Non-Potable
Subtotal Potable
DWR NOTES:
Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.
Total Entitlement: e.g. Water Right, Groundwater Allocation, Contracted Amount.
DRAFT
Retail Potable
Deliveries
1/1/2025
12/31/2025
No
Units for
Water
Volume
Extract and
Divert
Place
into
Storage
Conveyance Treatment Distribution Total Utility See DWR NOTES Hydropower Net Utility AF 5,122 0
N/A 5,444,758 5,444,758 5,444,758
N/A 0.0 0.0 0.0 0.0 3,262 0.0 0.0 0.00
Quantity of Self-Generated Renewable Energy
0 kWh
Data Quality (Estimate, Metered Data, Combination of Estimates and Metered Data) Data Quality Narrative:
Narrative:
Optional Submittal Table O-1A: Recommended Energy Reporting - SINGLE DELIVERY PRODUCT - WATER SUPPLY PROCESS APPROACH Water Delivery Product
drop down list
(If delivering more than one type of product recommend using Table O1C) Only for Water Delivery Products Under the Urban Water Supplier's Operational Control Start Date of Reporting Period
Water Management Process Non-Consequential Hydropower (if applicable) End Date of Reporting Period Is upstream embedded energy included in the values reported? Volume of Water Entering Process
Energy Consumed (kWh)
Energy Intensity (kWh/vol. converted to MG)
DWR NOTES: Total Utility:The volume of water entered in the “Total Utility” column should equal the volume of water entering the distribution system (excluding recycled water); in most cases, this is the total volume calculated in UWMP Table 4-1: 2025 Actual Total Uses for Potable and Non-Potable Water. Note if recycled water is included in your Submittal Table 4-1, you must exclude it from your volume in this table. NOTES:
DRAFT
% of Average Supply
Average Year 2016 100%Single-Dry Year 2018 104%
Consecutive Dry Years 1st Year 2011 105%Consecutive Dry Years 2nd Year 2012 108%Consecutive Dry Years 3rd Year 2013 107%Consecutive Dry Years 4th Year 2014 104%Consecutive Dry Years 5th Year 2015 106% 6,8527,094
Year Type
Base Year
If not using a calendar
year, type in the last
year of the fiscal,
water year, or range
of years, for example,
water year 2024-
2025, use 2025
Optional Submittal Table 7-1 Retail: Basis of Water Year Data (Reliability Assessment) Available Supplies if
Year Type Repeats
Check the box if quantification of available supplies is not compatible with this table and is provided elsewhere in the UWMP.Location: [insert location from UWMP] Volume Available (AF)
Quantification of available supplies is provided in this table as either volume only, percent only, or both.
7,1757,433
NOTES:
7,3087,1517,289
DWR NOTES: Supplier may use multiple versions of Submittal Table 7-1 R if different water sources have different base years and the supplier chooses to report the base years for each water source separately. If a Supplier uses multiple versions of Submittal Table 7-1 R, in the "Note" section of each submittal table, state that multiple versions of Submittal Table 7-1 R are being used and identify the particular water source that is being reported in each submittal table. Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3. This table reports the units of measure reported in Submittal Table 2-3.
DRAFT
2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF) 2050 (AF)
Supply totals
(autofill from Submittal Table 6-
9 R)
9,385 9,385 9,385 9,385 9,385
Use totals
(autofill from Submittal Table 4-
2 R)
5,527 5,690 5,859 6,032 6,086
Surplus/(shortfall) 3,858 3,695 3,526 3,353 3,299
WSCP - supply augmentation
benefit
WSCP - use reduction savings
benefit
Revised Surplus/(shortfall)
OPTIONAL Planned WSCP Actions
Submittal Table 7-2 Retail: Normal Year Supply and Use Comparison Water Code Section 10635 (a)
NOTES:
DWR NOTES : Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.
DRAFT
2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF) 2050 (AF)
Supply totals
(autofill from Submittal Table
6-9 R)
9,047 9,047 9,047 9,047 9,047
Use totals
(autofill from Submittal Table
4-2 R)
5,527 5,690 5,859 6,032 6,086
Surplus/(shortfall) 3,520 3,357 3,188 3,015 2,961
WSCP - supply augmentation
benefit
WSCP - use reduction savings
benefit
Revised Surplus/(shortfall)
If you choose to fill these optional tables, please paste the combin OPTIONAL Submittal Table 7-2 Retail: Normal Year Supply and Use Comparison - POTABLE OPTIONAL Planned WSCP Actions
NOTES:
DRAFT
2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF) 2050 (AF)
Supply totals
(autofill from Submittal Table
6-9 R)
338 338 338 338 338
Use totals
(autofill from Submittal Table
4-2 R)
0 0 0 0 0
Surplus/(shortfall) 338 338 338 338 338
WSCP - supply augmentation
benefit
WSCP - use reduction savings
benefit
Revised Surplus/(shortfall)
lease paste the combined information in the submittal table to the left.
OPTIONAL Submittal Table 7-2 Retail: Normal Year Supply and Use Comparison -
NON-POTABLE
OPTIONAL Planned WSCP Actions
NOTES:
DRAFT
Supply totals 9,717 9,717 9,717 9,717 9,717
Use totals 5,538 5,701 5,871 6,044 6,098
Surplus/(shortfall) 4,179 4,016 3,846 3,673 3,619
WSCP - supply
augmentation benefit
WSCP - use reduction
savings benefit
Revised Surplus/(shortfall)
2050 (AF)
10635. (a) Every urban water supplier shall include, as part of its urban water management plan, an assessment of the reliability of its water service to its customers during normal, dry, and multiple dry water years. This water supply and demand assessment shall compare the total water supply sources available to the water supplier with the long-term total projected water use over the next 20 years, in fiveyear increments, for a normal water year, a single dry water year, and a drought lasting five consecutive water years.
DWR NOTES : Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.
NOTES
Submittal Table 7-3 Retail: Single Dry Year Supply and Use Comparison Water Code Section 10635(a)
OPTIONAL Planned WSCP Actions
2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF)
DRAFT
2030 (AF) 2035 (AF) 2040 (AF) 2045 (AF) 2050 (AF)
Supply totals 9,828 9,828 9,828 9,828 9,828
Use totals 5,538 5,701 5,871 6,044 6,098
Surplus/(shortfall) 4,290 4,127 3,957 3,784 3,730
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Supply totals 10,181 10,181 10,181 10,181 10,181
Use totals 5,870 6,043 6,223 6,407 6,464
Surplus/(shortfall) 4,311 4,138 3,958 3,774 3,717
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Supply totals 10,010 10,010 10,010 10,010 10,010
Use totals 6,223 6,406 6,596 6,791 6,852
Surplus/(shortfall) 3,787 3,604 3,414 3,219 3,158
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Supply totals 9,795 9,795 9,795 9,795 9,795
Use totals 6,596 6,790 6,992 7,199 7,263
Surplus/(shortfall) 3,199 3,005 2,803 2,596 2,532
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Supply totals 9,984 9,984 9,984 9,984 9,984
Use totals 6,992 7,198 7,412 7,630 7,699
Surplus/(shortfall) 2,992 2,786 2,572 2,354 2,285
WSCP - supply augmentation benefit
WSCP - use reduction savings benefit
Revised Surplus/(shortfall)
Submittal Table 7-4 Retail: Multiple Dry Years Supply and Use Comparison Water Code Section 10635(a)
OPTIONAL Planned WSCP Actions
Third year
Fifth year
DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.
OPTIONAL Planned WSCP Actions
OPTIONAL Planned WSCP Actions
Fourth year OPTIONAL Planned WSCP Actions
NOTES:
First year
Second year OPTIONAL WSCP Actions
DRAFT
2026 Total
Total Water Use (AF) 5,226
Total Supplies (AF) 5,309
Surplus/Shortfall w/o WSCP Action 83
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
2027 Total
Total Water Use (AF) 5,258
Total Supplies (AF) 5,497
Surplus/Shortfall w/o WSCP Action 239
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
2028 Total
Total Water Use (AF) 5,291
Total Supplies (AF) 5,691
Surplus/Shortfall w/o WSCP Action 400
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
2029 Total
Total Water Use (AF) 5,324
Total Supplies (AF) 5,892
Surplus/Shortfall w/o WSCP Action 568
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
2030 Total
Total Water Use (AF) 5,356
Total Supplies (AF) 6,101
Submittal Table 7-5 Retail: Five-Year Drought Risk Assessment Water Code Section 10635(b)(3)
OPTIONAL Planned WSCP Actions (use reduction and supply augmentation) OPTIONAL Planned WSCP Actions (use reduction and supply augmentation) OPTIONAL Planned WSCP Actions (use reduction and supply augmentation) OPTIONAL Planned WSCP Actions (use reduction and supply augmentation) DRAFT
Surplus/Shortfall w/o WSCP Action 745
WSCP - supply augmentation benefit (AF)
WSCP - use reduction savings benefit (AF)
Revised Surplus/(shortfall)
10635 (b) Every urban water supplier shall
include, as part of its urban water management
plan, a drought risk assessment for its water
service... The drought risk assessment shall
include each of the following:
(1) A description of the data, methodology, and
basis for one or more supply shortage conditions
that are necessary to conduct a drought risk
assessment for a drought period that lasts five
consecutive water years, starting from the year
following when the assessment is conducted.
(2) A determination of the reliability of each source
of supply under a variety of water shortage
conditions. This may include a determination that a
particular source of water supply is fully reliable
under most, if not all, conditions.
(3) A comparison of the total water supply sources
available to the water supplier with the total
projected water use for the drought period.
(4) Considerations of the historical drought
hydrology, ...
NOTES:
DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.
OPTIONAL Planned WSCP Actions (use reduction and supply augmentation) DRAFT
Standard
Shortage
Levels
Percent Shortage
Range
Suppliers
Shortage
Levels
Percent
Shortage Range
1 Up to 10% N/A 0%
2 Up to 20% 1 Up to 15%
3 Up to 30% 2 15 to 25%
4 Up to 40% 3 25 to 35%
5 Up to 50%
6 >50%
Submittal Table 8-1: Cross-reference for Standard vs
Supplier Shortage Levels
Water Code Section 10632(a)(3)(B)
Check the box if the Supplier uses the Standard
six levels of water shortage.
Proceed to the next table.
NOTES:
4 35 to 50%
DRAFT
Volume or
Percentage
Drop down
Shortage Gap
Reduction Value
(May be a range) (AF)
All Stages Other Actions (describe) Reduce Water System Loss 4 - 6 Other Purchases
(E) For each action, an estimate of the extent to which the gap between supplies and demand will be reduced by implementation of the action.
Submittal Table 8-2 Retail: Supply Augmentation and Other ActionsWater Code Section 10632(a)(4)(A),(C) and (E) Add additional rows as needed
NOTES:
Is the Supplier completing this table using the standard six levels? (yes/no) 10632(a)(4) Shortage response actions that align with the defined shortage levels and include, at a minimum, all of the following:(A) Locally appropriate supply augmentation actions.(C) Locally appropriate operational changes.
How much is this going to reduce the
shortage gap?
DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.
Shortage
Level
Supply Augmentation Methods and
Other Actions by Water Supplier
Drop down list
These are the only categories that will be
accepted by the WUEdata online submittal tool
Additional Explanation or Reference
(OPTIONAL)
DRAFT
Yes
Volume or
Percentage
Drop down
Shortage Gap
Reduction Value
(May be a range)
(AF)
1 Landscape - Limit landscape irrigation to specific days Percentage 10 Yes 1 Other - Customers must repair leaks, breaks, and malfunctions in a timely manner Percentage 10 Yes
1 Landscape - Restrict or prohibit runoff from landscape irrigation Percentage 10 Yes1 Other - Prohibit use of potable water for washing hard surfaces Percentage 10 Yes2 Water Features - Restrict water use for decorative water features, such as fountains Percentage 20 Yes
2 CII - Restaurants may only serve water
upon request Percentage 20 Yes
2 Other - Prohibit use of potable water for construction and dust control Percentage 20 Yes3 Landscape - Limit landscape irrigation to specific times Percentage 30 Yes3 Other - Customers must repair leaks, breaks, and malfunctions in a timely manner Percentage 30 Yes
Is the Supplier completing this table using the standard six levels? (yes/no) Submittal Table 8-3 Retail: Demand Reduction ActionsWater Code Section 10632(a)(4)(B),(D), and (E) Add additional rows as needed
How much is this going to reduce the
shortage gap?
Shortage
Level
Demand Reduction Actions
Drop down list
These are the only categories that will be
accepted by the WUEdata online submittal
tool. Select those that apply.
Additional Explanation or Reference
(OPTIONAL)
Penalty, Charge, or
Other
Enforcement?
For Retail Suppliers Only
Drop Down List
DRAFT
3 Water Features - Restrict water use for decorative water features, such as fountains Percentage 30 Yes
4 Other - Prohibit vehicle washing except at facilities using recycled or recirculating water Percentage 40 Yes
4 Landscape - Other landscape restriction or prohibition Percentage 40 Yes4 Other Percentage 40 Main line flushing is allowed for emergency purposes only Yes5 Other - Customers must repair leaks, breaks, and malfunctions in a timely manner Percentage 50 Yes
6 Other Percentage 55 Additional prohibited uses as determined by the City Council Yes (D) Additional, mandatory prohibitions against specific water use practices that are in addition to state-mandated prohibitions and appropriate to the local condition (E) For each action, an estimate of the extent to which the gap between supplies and demand will be reduced by implementation of the action.10632(a)(4) Shortage response actions that align with the defined shortage levels and include, at a minimum, all of the following:(B) Locally appropriate demand reduction actions to adequately respond to shortages.NOTES:DWR NOTES: Units of measure (AF, CCF, MG) must remain consistent throughout the UWMP as reported in Submittal Table 2-3.
DRAFT
City Name 60 Day Notice
Drop Down (yes/no)
Notice of Public
Hearing
Drop Down (yes/no)
City of Long Beach Yes Yes
County Name
Drop Down List
60 Day Notice
Drop Down (yes/no)
Notice of Public
Hearing
Drop Down (yes/no)
CWC 10642 The water supplier is to provide the time and place of the hearing to any city or county within which the supplier provides water.
CWC 10621 (b)Notify at least 60 days prior to the public hearing any city or county within which the supplier provides water that the urban water supplier will be reviewing the plan and considering amendments or changes to the plan.
Submittal Table 10-1 Retail: Notification to Cities and Counties Water Code Section 10621(b) and 10642
Add additional rows as needed
Add additional rows as needed
NOTES:
DRAFT
Appendix I
Newspaper Notification
DRAFT
Appendix J
Checklist
DRAFT
Retail
(x = required)
Wholesale
(x = required) Order 2025 Guidebook Location Water Code Section Summary as Applies to UWMP Subject Relevant Submittal Table 2025 UWMP Location x x 1 Chapter 1 10615 A plan shall describe and evaluate sources of supply, reasonable and practical efficient uses, reclamation and demand management activities. Introduction and overview n/a x x 1 Chapter 1 10630.5
Each plan shall include a simple description of the Supplier’s plan including water availability, future requirements, a strategy for meeting needs, and other pertinent information. Additionally, a Supplier may also choose to include a simple description at the beginning of each chapter.
Plan preparation n/a
x x 2.1 Section 2.1 10620(b) Every person that becomes a Supplier shall adopt UWMP within one year after it has become a Supplier. Plan preparation n/a 1-1, 2-5
x n/a 2.5 Section 2.5 10644 Supplier shall report the Public Water Systems number, volume of delivered water, and number of connections that are included in this UWMP. Plan preparation 2-1 x x 2.5 Section 2.5 10644 Supplier shall report if this UWMP is an individual UWMP and whether the Supplier belongs to a regional UWMP or regional alliance. Plan preparation 2-2
x x 2.5 Section 2.5 10644 Supplier shall report whether the data is in fiscal or calendar years and the units of measure used for reporting water volumes. Plan preparation 2-3
x x 2.4 Section 2.4 10642
Provide supporting documentation that the Supplier has encouraged active involvement of diverse social, cultural, and economic elements of the population within the service area prior to and during the preparation of the plan and contingency plan.
Plan preparation n/a 2-5
x x 2.4 Section 2.4.2 10620(d)(3)
Coordinate the preparation of its plan with other appropriate agencies in the area, including other Suppliers that share a common source, water management agencies, and relevant public agencies, to the extent practicable.
Plan preparation n/a 2-5
x n/a 2.4 Section 2.4.1 10631(h) Retail Suppliers will include documentation that they have provided their Wholesale Supplier(s)—if any—with water use projections from that source. Plan preparation 2-4 R 6-1 n/a x 2.4 Section 2.4.1 10631(h)
Wholesale Suppliers will provide their Suppliers with identification and quantification of the existing and planned sources of water available from the Wholesale Supplier to the Supplier during various water year types.
Plan preparation 2-4 W 6-1
x x 3 Chapter 3.0 10631(a) Describe the Supplier service area. System description n/a 3-2 x x 3.3 Section 3.3 10631(a) Describe the climate of the Supplier’s service area. System description n/a 3-2 x x 3.4 Section 3.4.1 10631(a) Provide the current and projected service area populations for 2030, 2035, 2040, 2045 and optionally 2050. System description 3-1 3-2
x x 3.4 Section 3.4.2 10631(a) Describe other social, economic, and demographic factors affecting the Supplier’s water management planning. System description n/a 3-2
x x 3.5 Section 3.5 10631(a)
Describe the land uses within the service area… include the current and projected land uses within the existing or anticipated service area affecting the Supplier’s water management planning. Describe the land uses within the service area.
System description and baselines n/a 3-2
x Optional 4.2 Sections 4.2.3 and 4.2.4 10631(d)(1) Quantify past, current, and projected water use, identifying the uses among water use sectors. System water use 4-1 and 4-2 4-1 x Optional 4.3 Section 4.3.1 10631(d)(3)(A) Report the distribution system water loss for each of the five years preceding the plan update. System water use 4-5 x n/a 4.3 Section 4.3.2 10631(d)(3)(C) Retail Suppliers shall provide data to show the distribution loss standards were met. System water use 4-6 x n/a 4.2 Section 4.2.5.4 10631.1(a) Include projected water use needed for lower income housing projected in the service area of the Supplier. System water use 4-3
x n/a 4.2 Section 4.2.5.3 10631(d)(4)(A) In projected water use, include estimates of water savings from adopted codes, plans, and other policies or laws. System water use 4-3
x n/a 4.2 Section 4.2.5.3 10631(d)(4)(B) Provide citations of codes, standards, ordinances, or plans used to make water use projections. System water use 4-3 x n/a 4.2 Section 4.2.5.3 10631(d)(4)(B)(ii)
To the extent that a Supplier reports the information described in subparagraph (A), an urban water Supplier shall… Indicate the extent that the water use projections consider savings from codes, standards, ordinances, or transportation and land use plans. Water use projections that do not account for these water savings shall be noted of that fact.
System water use 4-3
x x 4.2 Section 4.2.5.6 10635(b) Demands under climate change considerations must be included as part of the drought risk assessment. System water use n/a 7-2
n/a x 5.1 Section 5.1 10608.36 Wholesale Suppliers shall include an assessment of present and proposed future measures, programs, and policies to help their Retail Suppliers achieve targeted water use reductions. Baselines and targets n/a x n/a 5.2 Section 5.2 10608.4
Retail Suppliers shall report on their compliance in meeting their water use targets. Reporting requirements will vary depending on whether the Supplier:
- Was considered an urban retail water supplier in 2020, - Met its 2020 target in 2020, or
- Was part of a merger or consolidation since 2020.
Chapter 5 Subsections 5.2.1, 5.2.2, and 5.2.3 address each of these situations.
Baselines and targets 5-1
x x 6.1 Section 6.1 10631(b)(2) When multiple sources of water supply are identified, describe the management of each supply in relationship to other identified supplies. System supplies n/a x x 6.1 Sections 6.1 and 6.2 10631(b)(1)
Provide a discussion of anticipated supply availability under a normal, single dry year, and a drought lasting five years, as well as more frequent and severe periods of drought, including changes in supply due to climate change.
System supplies n/a
x x 6.2 Section 6.2.2 10631(b)(4)(C)
Indicate whether groundwater is an existing or planned source of water available to the Supplier. If groundwater is identified as an existing or planned source of water… (include) a detailed description and analysis of the location, amount and sufficiency of groundwater pumped by the Supplier for the past five years.
Water supplies and recycled
water 6-1
x x 6.2 Section 6.2.2 10631(b)(4)(A)
Indicate whether a groundwater sustainability plan or groundwater management plan has been adopted by the Supplier or if there is any other specific authorization for groundwater management. Include a copy of the plan or authorization.
System supplies n/a 6-1
x x 6.2 Section 6.2.2 10631(b)(4)(B) Describe the groundwater basin. System supplies n/a 6-2 x x 6.2 Section 6.2.2 10631(b)(4)(B) Indicate if the basin has been adjudicated and include a copy of the court order or decree and a description of the amount of water the Supplier has the legal right to pump. System supplies n/a 6-2 x x 6.2 Section 6.2.2 10631(b)(4)(B) For unadjudicated basins… (include) information as to whether DWR has identified the basin as a high- or medium-priority basin in the most current official departmental bulletin… Water supplies and recycled
water n/a 6-2
x x 6.2 Section 6.2.2 10631(b)(4)(B) For unadjudicated basins… describe efforts by the Supplier to coordinate with sustainability or groundwater agencies to achieve sustainable groundwater conditions.
Water supplies and recycled
water n/a 6-2
x x 6.2 Section 6.2.2. 10631(b)(4)(C)
If groundwater is identified as an existing or planned source of water… (include) a detailed description and analysis of the location, amount and sufficiency of groundwater pumped by the Supplier for the past five years.
System supplies n/a
x x 6.2 Section 6.2.2 10631(b)(4)(D) Provide a detailed description and analysis of the amount and location of groundwater that is projected to be pumped. System supplies 6-9
x x 6.1 Section 6.1 10631(b) Identify and quantify the existing and planned sources of water available for 2025, 2030, 2035, 2040, 2045 and optionally 2050. System supplies 6-8 and 6-9
x x 6.2 Section 6.2.7 10631(c) Describe the opportunities for exchanges or transfers of water on a short-term or long-term basis. System supplies n/a 6-5 x n/a 6.2 Section 6.2.5 10633(a) Describe the wastewater collection and treatment systems in the Supplier’s service area with quantified amount of collection and treatment and the disposal methods. System supplies (recycled water) 6-2 x x 6.2 Section 6.2.5 10633(b) Describe the quantity of treated wastewater that meets recycled water standards, is being discharged, and is otherwise available for use in a recycled water project. System supplies (recycled water) 6-3 x x 6.2 Section 6.2.5 10633(c) Describe the recycled water currently being used in the Supplier's service area. System supplies (recycled water) 6-4 x x 6.2 Section 6.2.5 10633(d) Describe and quantify the potential uses of recycled water and provide a determination of the technical and economic feasibility of those uses. System supplies (recycled water) 6-4 x x 6.2 Section 6.2.5 10633(e) Describe the projected use of recycled water within the Supplier's service area at the end of 5, 10, 15, and 20 years, and describe the actual use of recycled water in comparison to uses previously projected. System supplies (recycled water) 6-4 and 6-5 DRAFT
x x 6.2 Section 6.2.5 10633(f) Describe the actions that may be taken to encourage the use of recycled water and the projected results of these actions in terms of acre-feet of recycled water used per year. System supplies (recycled water) 6-6 x x 6.2 Section 6.2.5 10633(g) Provide a plan for optimizing the use of recycled water in the Supplier's service area. System supplies (recycled water) n/a x x 6.2 Section 6.2.6 10631(g) Describe desalinated water project opportunities for long-term supply. System supplies 6-7 6-4 x x 6.2 Section 6.2.10 10631(f)
Describe the expected future water supply projects and programs that may be undertaken by the water Supplier to address water supply reliability in average, single-dry, and for a period of drought lasting five consecutive water years.
System supplies 6-7 9-1
x x 6.3 Section 6.3 and Appendix O 10631.2(a) The UWMP must include energy information, as stated in the code, that a Supplier can readily obtain. System suppliers, energy intensity O-1A, O-1B, O-1C, and O-2
x 7.1 Section 7.1 10634 Provide information on the quality of existing sources of water available to the Supplier and the manner in which water quality affects water management strategies and supply reliability.
Water supply reliability
assessment n/a 7-1
x x 7.2 Section 7.2 10635(a)
Service Reliability Assessment: Assess the water supply reliability during normal, dry, and a drought lasting five consecutive water years by comparing the total water supply sources available to the Supplier with the total projected water use over the next 20 years.
Water supply reliability
assessment 7-2, 7-3, and 7-4
x x 7.2 Section 7.2.3 10620(f) Describe water management tools and options to maximize resources and minimize the need to import water from other regions.
Water supply reliability
assessment n/a 1-1, 2-5
x x 7.3 Section 7.3 10635(b) Provide a drought risk assessment as part of information considered in developing the demand management measures and water supply projects.
Water supply reliability
assessment n/a 7-2
x x 7.3 Section 7.3 10635(b)(1)
Include a description of the data, methodology, and basis for one or more supply shortage conditions that are necessary to conduct a drought risk assessment for a drought period that lasts five consecutive years.
Water supply reliability
assessment n/a 7-3
x x 7.3 Section 7.3 10635(b)(2) Include a determination of the reliability of each source of supply under a variety of water shortage conditions.
Water supply reliability
assessment n/a
x x 7.3 Section 7.3 10635(b)(3) Include a comparison of the total water supply sources available to the Supplier with the total projected water use for the drought period.
Water supply reliability
assessment 7-5 7-4
x x 7.3 Section 7.3 10635(b)(4)
Include considerations of the historical drought hydrology, plausible changes on projected supplies and demands under climate change conditions, anticipated regulatory changes, and other locally applicable criteria.
Water supply reliability
assessment n/a
x x 8 Chapter 8 10632(a) Provide a water shortage contingency plan (WSCP) with specified elements below. Water shortage contingency planning n/a
x x 8 Chapter 8 10632(a)(1) Provide an analysis of water supply reliability (from Guidebook Chapter 7) in the WSCP. Water shortage contingency planning n/a
x x 8.2 Section 8.2 10632(a)(2)(A) Provide the written decision-making process and other methods that the Supplier will use each year to determine its water reliability.
Water shortage contingency
planning n/a
x x 8.2 Section 8.2 10632(a)(2)(B) Provide data and methodology to evaluate the Supplier’s water reliability for the current year and one dry year pursuant to factors in the code.
Water shortage contingency
planning n/a
x x 8.3 Section 8.3 10632(a)(3)(A)
Define six standard water shortage levels of 10%, 20%, 30%, 40%, 50% shortage, and greater than 50% shortage. These levels shall be based on supply conditions, including percent reductions in supply, changes in groundwater levels, changes in surface elevation, or other conditions. The shortage levels shall also apply to a catastrophic interruption of supply.
Water shortage contingency
planning n/a
x x 8.3 Section 8.3 10632(a)(3)(B) Suppliers with an existing WSCP that uses different water shortage levels must cross reference their categories with the six standard categories.
Water shortage contingency
planning 8-1
x x 8.4 Section 8.4 10632(a)(4)(A) Suppliers with WSCPs that align with the defined shortage levels must specify locally appropriate supply augmentation actions.
Water shortage contingency
planning 8-2
x x 8.4 Section 8.4 10632(a)(4)(B) Specify locally appropriate demand reduction actions to adequately respond to shortages. Water shortage contingency planning 8-3
x x 8.4 Section 8.4 10632(a)(4)(C) Specify locally appropriate operational changes. Water shortage contingency planning 8-2
x x 8.4 Section 8.4 10632(a)(4)(D) Specify additional mandatory prohibitions against specific water use practices that are in addition to State-mandated prohibitions are appropriate to local conditions.
Water shortage contingency
planning Table 8-3
x x 8.4 Section 8.4 10632(a)(4)(E) Estimate the extent to which the gap between supplies and demand will be reduced by implementation of the action.
Water shortage contingency
planning 8-2 and 8-3
x x 8.4 Section 8.4.6 10632.5 The UWMP shall include a seismic risk assessment and mitigation plan. Water shortage contingency plan n/a x x 8.5 Section 8.5 10632(a)(5)(A) Suppliers must describe that they will inform customers, the public and others regarding any current or predicted water shortages.
Water shortage contingency
planning n/a
x x 8.5 Section 8.5 10632(a)(5)(B),
10632(a)(5)(C)
Suppliers must describe that they will inform customers, the public and others regarding any shortage response actions triggered or anticipated to be triggered and other relevant communications.
Water shortage contingency
planning n/a
x n/a 8.6 Section 8.6 10632(a)(6) Retail Supplier must describe how it will ensure compliance with and enforce provisions of the WSCP. Water shortage contingency planning n/a
x x 8.7 Section 8.7 10632(a)(7)(A) Describe the legal authority that empowers the Supplier to enforce shortage response actions. Water shortage contingency planning n/a
x x 8.7 Section 8.7 10632(a)(7)(B) Provide a statement that the Supplier will declare a water shortage emergency per Water Code Chapter 3. Water Shortage Emergencies .
Water shortage contingency
planning n/a
x x 8.7 Section 8.7 10632(a)(7)(C) Provide a statement that the Supplier will coordinate with any city or county within which it provides water for the possible proclamation of a local emergency.
Water shortage contingency
planning n/a
x x 8.8 Section 8.8 10632(a)(8)(A) Describe the potential revenue reductions and expense increases associated with activated shortage response actions.
Water shortage contingency
planning n/a
x x 8.8 Section 8.8 10632(a)(8)(B) Provide a description of mitigation actions needed to address revenue reductions and expense increases associated with activated shortage response actions.
Water shortage contingency
planning n/a
x n/a 8.8 Section 8.8 10632(a)(8)(C) Retail Suppliers must describe the cost of compliance with Water Code Chapter 3.3, Excessive Residential Water Use During Drought.
Water shortage contingency
planning n/a
x n/a 8.9 Section 8.9 10632(a)(9) Retail Suppliers must describe the monitoring and reporting requirements and procedures that ensure appropriate data are collected, tracked, and analyzed for purposes of monitoring customer compliance.
Water shortage contingency
planning n/a
x x 8.10 Section 8.10 10632(a)(10) Describe reevaluation and improvement procedures for monitoring and evaluation the WSCP to ensure risk tolerance is adequate and appropriate water shortage mitigation strategies are implemented.
Water shortage contingency
planning n/a
x n/a 8.11 Section 8.11 10632(b) Analyze and define water features that are artificially supplied with water, including ponds, lakes, waterfalls, and fountains, separately from swimming pools and spas.
Water shortage contingency
planning n/a
x x 8.12 Section 8.12 10632(c) Make available the WSCP to customers and any city or county where it provides water within 30 days after adoption of the plan.
Water shortage contingency
planning n/a
x n/a 9.1 Sections 9.1 10631(e)(1)
Retail Suppliers shall provide a description of the nature and extent of each demand management measure implemented over the past five years. The description will address specific measures listed in code.
Demand management measures n/a 4-7
n/a x 9.2 Sections 9.2 10631(e)(2) Wholesale Suppliers shall describe specific demand management measures listed in code, their distribution system asset management program, and Supplier assistance program. Demand management measures n/a x n/a 10 Chapter 10 10608.26(a) Retail Suppliers shall conduct a public hearing to discuss adoption, implementation, and economic impact of water use targets (recommended to discuss compliance).
Plan adoption, submittal, and
implementation n/a
x x 10.2 Section 10.2.1 10621(b)
Notify, at least 60 days prior to the public hearing, any city or county within which the Supplier provides water that the Supplier will be reviewing the UWMP and considering amendments or changes to the plan.
Plan adoption, submittal, and
implementation 10-1 1-1
x x 10.4 Section 10.4 10621(f) Each urban water Supplier shall update and submit its 2025 plan to DWR by July 1, 202 6. Plan adoption, submittal, and implementation n/a
x x 10.2 Sections 10.2.2, 10.3, and 10.5 10642
Provide supporting documentation that the Supplier made the UWMP and WSCP available for public inspection, published notice of the public hearing, and held a public hearing about the UWMP and WSCP.
Plan adoption, submittal, and
implementation n/a 2-5
x x 10.2 Section 10.2.2 10642 The Supplier is to provide the time and place of the hearing to any city or county within which the Supplier provides water.
Plan adoption, submittal, and
implementation 10-1 2-5
x x 10.3 Section 10.3.2 10642 Provide supporting documentation that the UWMP and WSCP has been adopted as prepared or modified.
Plan adoption, submittal, and
implementation n/a 2-5
DRAFT
x
x 10.4 Section 10.4 10644(a) Provide supporting documentation that the Supplier has submitted their UWMP to the California State Library.
Plan adoption, submittal, and
implementation n/a
xx 10.4 Section 10.4 10644(a)(1) Provide supporting documentation that the Supplier has submitted their UWMP to any city or county within which the Supplier provides water no later than 30 days after adoption.
Plan adoption, submittal, and
implementation n/a
xx 10.4 Sections 10.4.1 and 10.4.2 10644(a)(2) The UWMP, or amendments to the UWMP, submitted to DWR shall be submitted electronically. Plan adoption, submittal, and implementation n/a 2-2
xx 10.7 Section 10.7.2 10644(b) If revised, submit a copy of the WSCP to DWR within 30 days of adoption. Plan adoption, submittal, and implementation n/a
xx 10.5 Section 10.5 10645(a) Provide supporting documentation that, not later than 30 days after filing a copy of its UWMP with DWR, the Supplier has or will make the plan available for public review during normal business hours.
Plan adoption, submittal, and
implementation n/a
xx 10.5 Section 10.5 10645(b) Provide supporting documentation that, not later than 30 days after filing a copy of its WSCP with DWR, the Supplier has or will make the plan available for public review during normal business hours.
Plan adoption, submittal, and
implementation n/a
xx 10.6 Section 10.6 10621(c) If Supplier is regulated by the Public Utilities Commission, include its plan and contingency plan as part of its general rate case filings.
Plan adoption, submittal, and
implementation n/a
DRAFT
DRAFT
To: Honorable City Council
From: John Moreno, City Manager
By: Yecenia Guillen, Community Services
Director
Date: June 23, 2026
SUBJECT: AGREEMENT WITH MUSEUM PROS FOR THE DESIGN OF HISTORICAL
DISPLAYS FOR THE PARAMOUNT SAW MUSEUM
BACKGROUND
As part of the Downtown Revitalization Project, the City researched ways to rehabilitate and preserve the Paramount Saw Property for a Historical Museum, Community Meeting Room, and a commercial restaurant space to support and create a vibrant community gathering space. Consistent with this vision, the City entered into an agreement with Paramount City Investors, LLC Development Group (Paramount City Investors), for the development of the Paramount Saw Property. As part of the City’s contribution to development of the Paramount Saw building, the City was allocated 3,000 square feet of space for the inclusion of a Paramount history museum and community meeting space.
As part of the project, the City Council authorized an agreement with Hamilton Architects, Inc. (Hamilton), to provide architectural design services for the Paramount History Museum and associated community meeting space. The museum component is planned as an integrated historical feature within the larger food hall development and will include approximately 1,500 square feet of open exhibit space highlighting Paramount’s history, artifacts, archival materials, signature exhibits, and an original early-model Zamboni ice resurfacing machine.
DISCUSSION
City staff, Hamilton Architects Inc. (Hamilton), and Paramount City Investors, LLC Development Group (Paramount City Investors) have been working together to design the elements and the construction plans for spaces that will be located within the Paramount Saw Building. As the project has progressed, it became necessary to obtain the services of a specialized historical consultant to identify the historical exhibits and artifacts best suited for inside the museum space. Staff retained services through Pat West Consulting and began working closely with their consultants to identify the potential artifacts that may be displayed that are currently in the City’s possession.
Additionally, as the design phase has continued, staff and the consultant also determined the need to begin the exhibit development phase, which is focused on the conceptual layout and display systems that will define the visitor experience within the museum Agenda Report June 23, 2026
AGREEMENT WITH MUSEUM PROS Page 2
space. This phase builds upon historical narratives, initial spatial concepts, and is now centered on determining the most appropriate exhibit structures and display strategies for the space.
As part of the exhibit development phase, the consultants and City staff visited other similar museum spaces in the nearby area, in particular, the Rancho Los Cerritos Gallery in the City of Long Beach to gain insight on potential design elements for the historical displays that will be located inside the museum. Given the unique nature of this project, it was determined that there is a need to work with a specialized vendor that has experience in designing museum exhibition displays. Staff contacted Museum Pros after visiting the Rancho Los Cerritos Gallery to solicit a quote for their services to design the exhibit displays.
Museum Pros has developed a design concept for City consideration. The main elements in the design include large metal frames that create and support a variety of interpretive content, Zamboni railing with heavy bases, dimensional back wall with multiple 3D features. This concept also includes builds that are specific to the City’s unique museum space that maintain interpretive quality and durability. Key design considerations include:
• Strong visual impact
• Fully custom display cubes and vitrines
• Memorable visitor experience
• High engagement for young audiences
• Professional artifact presentation
• Adaptable for future growth
• Rich narrative potential
• Custom-designed scaffold-style exhibit frameworks and display systems • Integration of artifact displays, archival materials, and interpretive panels • Flexible gallery layouts responsive to narrative and artifact quantity • Coordination with City operational needs, including installation responsibilities Given the custom designs involved in this project and the unique scope, staff found that Museum Pros is the only specialized vendor that can complete this type of work. Staff requested refined design concepts to align with project scope, including complete design, fabrication, signage components, and phasing opportunities for future enhancements.
The consultant has also evaluated alternative materials and off-the-shelf solutions; however, fully custom fabrication remains the preferred approach for long-term durability and exhibit quality. Museum Pros will also work closely with the City to coordinate and assist with the installation of the custom displays, which will be completed by City Public Works personnel.
The cost of the exhibit displays design services from Museum Pros is $81,000, excluding a ten percent (10%) contingency for potential change orders. Total project costs, including the ten percent (10%) contingency, amount to $89,100. The City’s Municipal Code Section 3.12.080 exempts professional/technical services from bidding requirements.
However, since the projected cost for the design services is over $40,000, City Council Agenda Report June 23, 2026
AGREEMENT WITH MUSEUM PROS Page 3
approval is required for the agreement. Also, with respect to City’s Municipal Code Section 3.12.070, exemptions to bidding may be acceptable at the City’s Council’s discretion, should the goods or services be deemed highly unique and only obtainable through a sole source vendor. Given the custom work involved in this project and the unique scope, staff found that Museum Pros is the most qualified and specialized vendor to complete this type of work. Staff recommend that the City Council approve an agreement with Museum Pros for the design services of the historical exhibit displays.
FISCAL IMPACT
Budget adjustment request of $89,100 in the Art Fund is needed. Funds were not included in the FY 2026-27 Art Fund budget for this expenditure. Based on the scope, this project is an allowable expenditure under the Art Fund. The total projected cost includes a ten percent (10%) contingency for contract change orders that may arise during the design process.
Expenditure Account Code
Fund Division Account Service Description Request
Amount
292 9550 7146 Historical Museum
Exhibit Displays
(Design)
$89,100
VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No 2: Community Health - Provide diverse recreational and cultural amenities that support healthy lifestyles and a sense of community. 5: Attractive and Well-Maintained Infrastructure - Develop and maintain City-owned infrastructure, parks, facilities, and amenities that enhance quality of life and the attractiveness of the community.
RECOMMENDED ACTION
1) Approve a budget adjustment of $89,100 in the Art Fund for this expense; and 2) Approve an agreement with Museum Pros, in an amount not to exceed $89,100 for the design of the exhibit displays for the Paramount Saw Museum project and authorize the Mayor or her designee to execute the agreement.
1 CITY OF PARAMOUNT
PROFESSIONAL SERVICES AGREEMENT
(With Professional Liability)
This Agreement is made and entered into as of June 24, 2026 by and between the City of Paramount, a municipal corporation organized and operating under the laws of the State of California with its principal place of business at 16400 Colorado Avenue, Paramount, CA 90723 (“City”), and MUSEUM PROS, LLC., an ARIZONA CORPORATION with its principal place of business at 25437 S. Illinois Ave., Sunlakes, AZ., 85248 (hereinafter referred to as “Consultant”).
City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.
RECITALS
A. City requires provision of the following professional services:
For the design, fabrication, and assistance with installation of the historical artifact displays and exhibits that will be located at the Paramount Historical Saw Museum, all as more fully set forth and described in this Agreement.
B. Consultant is duly licensed and/or otherwise fully authorized by law, and has the necessary experience and qualifications, to provide such services. City enters into this Agreement in substantial reliance on such experience and qualifications.
C. The Parties enter this Agreement in order to set forth terms and conditions governing Consultant’s performance of the services described herein.
AGREEMENT
NOW, THEREFORE, IT IS AGREED AS FOLLOWS:
1. Scope of Services.
Consultant shall perform the services generally described in (i) the Scope of Services attached hereto as Exhibit “A”; (ii) any applicable request for proposals issued by the City; and (iii) as otherwise required by this Agreement, all to City’s satisfaction (collectively, “Services” herein.)
2. Compensation.
a. Subject to Section 2.b, below, the City shall pay for the Services satisfactorily performed, in accordance with the Schedule of Rates/Payments set forth in Exhibit “B”, attached hereto.
b. In no event shall the total amount paid for the Services exceed the sum of $89,100.
This amount covers and is inclusive of all labor, materials, and any and all other costs incurred by Consultant in performing the Services, unless otherwise agreed upon in writing. Consultant shall be deemed to have made all necessary inquiries and site inspections prior to agreeing to perform the Services. Periodic payments for Paramount PSA_Prof Liability (January 2025) 2
undisputed work shall be made within thirty (30) days of receipt of an invoice which includes a detailed description of the work performed. Payments to Consultant for work performed will be made on a monthly billing basis.
3. Additional Work.
The Parties may agree on additional work to be provided as part of the Services. An amendment to this Agreement shall be prepared by the City and executed by both Parties authorizing such additional work and compensation therefor, prior to such work being performed.
4. Maintenance of Records.
Books, documents, papers, accounting records, and other evidence pertaining to costs incurred shall be maintained by Consultant and made available for review by the City at all reasonable times during the term of this Agreement and for four (4) years from the date of final payment by City.
5. Term; Time of Performance.
The term of this Agreement shall commence on the date first set forth above and shall expire on June 30, 2027, unless extended or earlier terminated as provided herein.
Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines agreed upon in writing. Consultant represents that it has the professional and technical personnel required to satisfactorily perform the Services as required by this Agreement. All indemnification provisions of this Agreement shall survive and remain in effect following the termination of this Agreement.
The Parties may, by mutual, written consent, extend the term of this Agreement.
6. Delays in Performance.
a. Force Majeure. Neither City nor Consultant shall be considered in default of this Agreement for delays in performance caused by force majeure events. Force majeure events mean and refer to circumstances beyond the reasonable control of the nonperforming party including, but not limited to, abnormal weather conditions; floods; earthquakes; fire; epidemics; war; riots and other civil disturbances; strikes, lockouts, work slowdowns, and other labor disturbances; sabotage or judicial restraint.
Consultant’s lack of financial capability, not due to any of the foregoing events, shall not constitute a force majeure event.
b. Should a force majeure event occur, the non-performing party shall, within a reasonable time of being prevented from performing, but not more than three (3) business days, give written notice to the other party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement.
7. Compliance with Law.
Paramount PSA_Prof Liability (January 2025) 3
a. Consultant shall comply with all applicable local, State, and federal laws, ordinances, statutes, codes and regulations, including Cal/OSHA requirements, in the performance of the Services.
b. City may, but is not required, to assist Consultant in obtaining and maintaining all permits required of Consultant by federal, state and/or local regulatory agencies. c. If applicable, and unless otherwise provided in the Scope of Services, Consultant is responsible for all costs of clean up and/or removal of hazardous and toxic substances spilled as a result of his or her services or operations performed under this Agreement.
8. Standard of Care.
Consultant’s Services shall be performed in accordance with the generally accepted professional standards of practice and principles and in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently performing similar services under similar conditions in the County of Los Angeles. Consultant shall, at all times herein, possess any and all State of California and/or federal professional licenses and certifications, as applicable, required to lawfully perform the Services.
9. Assignment and Subcontracting.
Consultant shall not assign or transfer this Agreement or any rights or obligations under, or any interest in this Agreement, or subcontract any required performance hereunder, without the prior written consent of the City, which may be withheld for any reason. The Services required to be performed by the Consultant are personal to the Consultant. Any attempt to so assign, transfer, or subcontract without such consent shall be void and without legal effect and shall constitute grounds for termination. Authorized subcontracts, if any, shall contain a provision making the subcontractor subject to all requirements of this Agreement.
10. Independent Contractor.
Consultant is retained as an independent contractor and is not an employee of City. No employee or agent of Consultant is or shall become an employee of City. The work to be performed shall be in accordance with the Scope of Services described in this Agreement, subject to such directions and amendments from City as herein provided. a. All work and other Services provided pursuant to this Agreement shall be performed by Consultant or by Consultant’s employees or other personnel under Consultant’s supervision, and Consultant and all of Consultant’s personnel shall possess the qualifications, permits, and licenses required by State and local law to perform the Services, including, without limitation, a City of Paramount business license as required by the Paramount Municipal Code. Consultant will determine the means, methods, and details by which Consultant’s personnel will perform the Services.
Consultant shall be solely responsible for the satisfactory work performance of all personnel engaged in performing the Services and compliance with the customary professional standards.
Paramount PSA_Prof Liability (January 2025) 4
b. None of Consultant’s employees and/or other personnel performing any of the Services under this Agreement on behalf of Consultant shall be employees of City and shall at all times be under Consultant’s exclusive direction and control. Consultant and Consultant’s personnel shall not supervise any of City’s employees; and City’s employees shall not supervise Consultant’s personnel. Consultant’s personnel shall not wear or display any City uniform, badge, identification number, or other information identifying such individual as an employee of City; and Consultant’s personnel shall not use any City e-mail address or City telephone number in the performance of any of the Services under this Agreement. Consultant shall acquire and maintain at its sole cost and expense such vehicles, equipment and supplies as Consultant’s personnel require to perform any of the Services required by this Agreement.
Consultant shall perform all Services off of City premises at locations of Consultant’s choice, except as otherwise may from time to time be necessary in order for Consultant’s personnel to receive projects from City, review plans on file at City, pick up or deliver any work product related to Consultant’s performance of any Services under this Agreement, or as may be necessary to inspect or visit City locations and/or private property to perform such Services. City may make a computer available to Consultant from time to time for Consultant’s personnel to obtain information about or to check on the status of projects pertaining to the Services under this Agreement. c. Consultant shall be responsible for and pay all wages, salaries, benefits and other amounts due to Consultant’s personnel in connection with their performance of any Services under this Agreement and as required by law. Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: Social Security taxes, other retirement or pension benefits, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance. Notwithstanding any other agency, State, or federal policy, rule, regulation, statute or ordinance to the contrary, Consultant and its officers, employees, agents, and subcontractors providing any of the Services under this Agreement shall not become entitled to, and hereby waive any claims to, any wages, salaries, compensation, benefit or any incident of employment by City, including but not limited to, eligibility to enroll in, or reinstate to membership in, the California Public Employees Retirement System (“PERS”) or any other retirement program, as an employee of City, and entitlement to any contribution to be paid by City for employer contributions or employee contributions for PERS benefits or any other retirement benefits.
d. To the maximum extent permitted by laws, Consultant shall indemnify, defend and hold harmless the City and other Indemnitees (as defined in Section 13.a herein), from any and all liabilities, damages, claims, costs and expenses of any nature to the extent arising from, caused by, or relating to Consultant’s violation of any provision of this Section 10, or any of Consultant’s personnel practices. In addition to all other remedies at law, City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to promptly pay to City any reimbursement or indemnification obligation arising under this Section. The duty of indemnification set forth in this Section is in addition to all other indemnification provisions of this Agreement.
Paramount PSA_Prof Liability (January 2025) 5
11. PERS Compliance.
General Requirements. The Parties acknowledge that City is a local agency member of PERS, and as such has certain pension reporting and contribution obligations to PERS on behalf of qualifying employees. Consultant agrees that, in providing its employees and any other personnel to City to perform any work or other Services under this Agreement, Consultant shall assure compliance with the Public Employees’ Retirement Law, commencing at Government Code § 20000, the regulations of PERS, and the Public Employees’ Pension Reform Act of 2013, as amended. Without limitation to the foregoing, Consultant shall assure compliance with regard to personnel who have active or inactive membership in PERS and to those who are retired annuitants and in performing this Agreement shall not assign or utilize any of its personnel in a manner that will cause City to be in violation of the applicable retirement laws and regulations. .
12. Insurance.
Unless otherwise permitted in writing by City’s Risk Manager, Consultant shall not commence work for the City until it has secured insurance in such forms and with such limits as set forth in Exhibit “C“ attached hereto, and provided evidence thereof that is acceptable to the City. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has secured all insurance required under this section.
13. Indemnification.
a. To the fullest extent permitted by law, Consultant shall defend (with counsel reasonably approved by City), indemnify and hold the City, its elected and appointed officials, officers, attorneys, agents, employees, servants, designated volunteers, successors, assigns and those City agents serving as independent contractors in the role of City officials (collectively “Indemnitees” in this Section 13) free and harmless with respect to any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages, stop notices and/or injury of any kind, in law or equity, to property or persons, including bodily injury, wrongful death, personal injury and property damage, in any manner arising out of, pertaining to, or incidental to any acts, errors, omissions, or willful misconduct of Consultant, its owners, officials, officers, employees, servants, subcontractors, consultants or agents in connection with the performance of the Consultant’s Services, and/or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by Consultant, or by the City or any of the other Indemnitees. Consultant’s duty to indemnify and hold harmless City shall not extend to the City’s sole or active negligence or willful misconduct. b. For Design Professional Services: If Consultant’s Services hereunder include the performance of professional services by a “design professional,” as the term is defined under California Civil Code § 2782.8(c), then to the fullest extent permitted by law, the Consultant shall, at its sole cost and expense, indemnify and hold harmless the Indemnitees, and each of them, from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, judgments, Paramount PSA_Prof Liability (January 2025) 6
penalties, liens, and losses of any nature whatsoever, including fees of accountants and other professionals, and all costs associated therewith, and reimbursement of attorneys’ fees and costs of defense, whether actual, alleged or threatened, to the extent arising out of, pertaining to, or relating to, in whole or in part, the negligence, recklessness or willful misconduct of the Consultant, and/or its officers, agents, servants, employees, subcontractors, contractors or their officers, agents, servants or employees (or any entity or individual for whom the Consultant shall bear legal liability) in the performance of design professional services under this Agreement.
Notwithstanding the foregoing and as required by Civil Code § 2782.8(a), in no event shall the cost to defend the Indemnitees that is charged to Consultant, exceed Consultant’s proportionate percentage of fault. Consultant’s duty to indemnify and hold harmless City shall not extend to the City’s sole or active negligence or willful misconduct.
c. The provisions of this Section 13 shall survive the termination of this Agreement.
14. California Labor Code Requirements.
a. Consultant is aware of the requirements of California Labor Code Sections 1720, et seq. and 1770, et seq., which require the payment of prevailing wages and the performance of other requirements on certain “public works” and “maintenance” projects (“Prevailing Wage Laws”). If the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with the Prevailing Wage Laws. These rates are on file with the City Clerk or may be obtained at: http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. (i) Copies of the prevailing wage rates may be obtained at cost at the City Clerk's office. Consultant shall post a copy of such wage rates at the job site and shall pay the adopted prevailing wage rates as a minimum. Consultant shall comply with the provisions of Sections 1775, 1776, 1777.5, 1777.6, and 1813 of the Labor Code. Pursuant to the provisions of 1775 of the Labor Code, Consultant shall forfeit to the City, as a penalty, not more than $200.00 for each calendar day, or portion thereof, for each laborer, worker, or mechanic employed, paid less than the stipulated prevailing rates for any work done under this Agreement, by them or by any subcontractor under them, in violation of the provisions of this Agreement. (ii) Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It shall be mandatory upon the Consultant and all subcontractors to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code Section 1771.4 shall not apply to Paramount PSA_Prof Liability (January 2025) 7
work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4. b. If the Services are being performed as part of an applicable “public works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and all subcontractors performing such Services must be registered with the Department of Industrial Relations. Consultant shall maintain registration for the duration of this Agreement and require the same of any subcontractors, as applicable.
Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
c. This Agreement may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements. Any stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor that affect Consultant’s performance of the Services, including any delay, shall be Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Consultant caused delay and shall not be compensable by the City. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor.
15. Data Security.
a. As used in this Agreement, “City Data” means any and all information and data provided or made accessible, directly or indirectly, to Consultant by City, or otherwise acquired from City, in connection with Consultant’s performance of the Services. As between the Consultant and the City, any and all City Data is solely owned by City.
Consultant is granted a limited, non-exclusive, and revocable license to use City Data solely as necessary to perform the Services. At no time shall Consultant use City Data for its own purposes, or sell, disclose or disseminate City Data, except as required by law or to provide the Services. At all times herein, Consultant shall protect and maintain the security of City Data using methods providing not less than the level of security Consultant uses for its own confidential data, and that otherwise comply with recognized industry data security standards applicable to similar kinds of governmental data and information.
b. To the extent any City Data consists of personal information as defined in the California Consumer Privacy Act (Civil Code Section 1798.100, et seq.), Consultant shall comply with that statute and with Civil Code Section 1798.80. et seq., including providing the required notifications in the event of any unauthorized access or disclosure of personal information stored, maintained, accessed, used or transmitted by Consultant in connection with this Agreement. Notwithstanding the foregoing, Consultant shall within 24 hours notify the City Representative by telephone and in writing of any unauthorized access of City Data. Thereafter, Consultant shall render Paramount PSA_Prof Liability (January 2025) 8
any assistance to City and law enforcement as necessary to ascertain the nature and extent of such unauthorized access.
c. Consultant shall not store City Data using cloud-based storage without City’s prior, written consent, unless the use of such storage is clearly described in the Scope of Services. Where permitted herein, any and all cloud-based storage shall be on servers and other hardware located within the continental United States, and shall be in compliance with ISO/IEC 27001 - 27018, as applicable, unless otherwise agreed to in writing by the City Representative. Cloud storage using Amazon Web Service or Microsoft Azure shall be deemed to satisfy the requirements of this subsection (c).
16. Confidential Information
Consultant understands and agrees that, in the performance of the Services under this Agreement or in contemplation thereof, Consultant may have access to private or confidential information which may be owned or controlled by the City and that, if disclosed to third parties, could be damaging to the City. Consultant agrees that all City information and data provided to or made accessible to Consultant by City shall be held in confidence and disclosed only as needed in performance of this Agreement, or as required by law.
Consultant shall exercise the same standard of care to protect such information as a reasonably prudent consultant would use to protect its own confidential and/or proprietary information and data.
17. Laws and Venue.
This Agreement shall be interpreted in accordance with the laws of the State of California without regard for conflicts of laws rules. If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a state or federal court situated in the County of Los Angeles, State of California. Consultant must comply with the claim procedures set forth in Government Code section 900, et seq. prior to filing any lawsuit against the City.
18. Termination.
a. City has the right to terminate any portion or all of the Services under this Agreement with or without cause, by giving ten (10) calendar days’ prior, written notice to Consultant. In such event, City shall be immediately given title to and possession of all Work Product, including all related intellectual property rights, and original field notes, drawings and specifications, written reports and all other documents produced or developed pursuant to this Agreement. Provided Consultant is not then in breach, City shall pay Consultant the reasonable value of services rendered for any portion of the Services completed prior to termination. If said termination occurs prior to completion of any specific task for which a payment request has not been received, the charge for Services performed shall be the reasonable value of such Services, based on an amount agreed to by City and Consultant. City shall not be liable for any costs other than the charges or portions thereof which are specified herein.
Consultant shall not be entitled to payment for unperformed services or services within the Scope Services performed prior to the effective date of this Agreement, and shall Paramount PSA_Prof Liability (January 2025) 9
not be entitled to damages or compensation resulting from such termination of the Services.
b. Consultant may terminate its obligation to provide further Services under this Agreement by serving written notice of termination to the City, provided Consultant has first served the City with a written notice of default and demand to cure, and City has failed to cure such default within thirty (30) days of receipt of such notice.
19. Ownership of Work Product.
a. Except as otherwise provided in Section 18, “Termination”, above, and unless otherwise agreed upon in writing, all draft and final reports, documents, and other written material, and any and all images, ideas, concepts, designs including website designs, source code, object code, electronic data and files, and/or other media whatsoever created or developed by Consultant in the performance of this Agreement (collectively, “Work Product”) shall be considered to be “works made for hire” for the benefit of City. All Work Product and any and all intellectual property rights arising from their creation, including, but not limited to, all copyrights and other proprietary rights, shall be and remain the property of City without restriction or limitation upon their use, duplication or dissemination by City upon final payment being made or termination of the Agreement by City, provided that any such use shall be at City’s sole risk. Consultant shall not obtain or attempt to obtain copyright protection as to any of the Work Product. “Work Product” does not include intellectual property lawfully owned by or licensed to Consultant prior to the effective date of this Agreement. b. Consultant hereby assigns to City all rights of ownership to the Work Product, including any and all related intellectual property and proprietary rights that are not otherwise vested in the City pursuant to subsection (a), above. c. Consultant warrants and represents that it has secured all necessary licenses, consents or approvals necessary to the production of the Work Product, and that upon final payment or Consultant’s default, City shall have full legal title to the Work Product, and full legal authority and the right to use and reproduce the Work Product for any purpose. Consultant shall defend, indemnify and hold City, and the other Indemnitees (as defined in Section 13(a), above) harmless from any and all loss, claim or liability in any way related to a claim that City’s use of any of the Work Product violates federal, state or local laws, or any contractual provisions, or any rights or laws relating to trade names, licenses, franchises, copyrights, patents or other means of protecting intellectual property rights and/or interests in products, ideas or inventions. Consultant shall bear all costs arising from the use of patented, copyrighted, trade secret or trademarked documents, materials, equipment, devices or processes in connection with its provision of the Work Product produced under this Agreement. In the event the use of any of the Work Product or other deliverables hereunder by City is held to constitute an infringement and the use of any of the same is enjoined, Consultant, at its expense, shall: (a) secure for City the right to continue using the Work Product and other deliverables by suspension of any injunction, or by procuring a license or licenses for City; or (b) modify the Work Product and other deliverables so that they Paramount PSA_Prof Liability (January 2025) 10
become non-infringing while remaining in compliance with the requirements of this Agreement. This covenant shall survive the termination of this Agreement.
20. Party Representatives.
Consultant hereby designates _____________________________, or his or her designee, as Consultant’s Representative for this Agreement, unless and until written notice of a new representative acceptable to City is provided to City. City hereby designates _________________________, or his or her designee, as City’s Representative for this Agreement. The foregoing Representatives shall be authorized to approve non-monetary revisions to this Agreement, provide consent where required herein, and to make other administrative decisions that will be binding on their respective Party, except as otherwise specifically required herein.
21. Notices.
Any notice or instrument required or permitted to be given or delivered by this Agreement may be given or delivered by depositing the same in any United States Post Office, certified mail, return receipt requested, postage prepaid, addressed to:
CITY:
City of Paramount
16400 Colorado Avenue
Paramount, CA 90723
Attn: Yecenia Guillen, Community
Services Department
CONSULTANT:
Michelle Reid
Owner
25437 S. Illinois Ave., Sunlakes AZ.,
85248
and shall be effective upon receipt thereof.
22. Third Party Rights.
Nothing in this Agreement shall be construed to give any rights or benefits to anyone other than the City and the Consultant.
23. Equal Opportunity Employment.
Consultant represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.
24. Entire Agreement.
This Agreement, with its exhibits, all of which are incorporated by reference herein, and all documents incorporated by reference, represents the entire understanding of City and Consultant as to those matters contained herein, and supersedes and cancels any prior Paramount PSA_Prof Liability (January 2025) 11
or contemporaneous oral or written understanding, promises or representations with respect to those matters covered hereunder. Each party acknowledges that no representations, inducements, promises or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. This Agreement may not be modified or altered except in writing signed by both Parties hereto.
This is an integrated Agreement. In the event of any conflict or inconsistency between the provisions of this Agreement and any exhibit hereto or document incorporated by reference herein, the provisions of this Agreement shall govern.
25. Severability.
The unenforceability, invalidity or illegality of any provision(s) of this Agreement shall not render any other provisions unenforceable, invalid or illegal.
26. Successors and Assigns.
This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each party to this Agreement.
However, Consultant shall not assign or transfer by operation of law or otherwise any or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.
27. Non-Waiver.
None of the provisions of this Agreement shall be considered waived by either party, unless such waiver is agreed to in writing, and any such waiver shall be limited to that set of circumstances and not to any future circumstances unless another written waiver is executed.
28. Time of Essence.
Time is of the essence in each and every provision of this Agreement.
29. City’s Right to Employ Other Consultants.
City reserves its right to employ other consultants to provide the Services or similar services to the City.
30. Interest of Consultant.
Consultant covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the Services under this Agreement. Consultant certifies that no one who has or will have any financial interest under this Agreement is an officer or employee of the City.
31. Interest of Subcontractors.
Paramount PSA_Prof Liability (January 2025) 12
Consultant further covenants that, in the performance of this Agreement, no subcontractor or person having any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the Services under this Agreement shall be employed. Consultant has provided City with a list of all subcontractors and the key personnel for such subcontractors that are retained or to be retained by Consultant in connection with the performance of the Services, to assist the City in affirming compliance with this Section.
32. Prohibited Interests.
Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. If required, Consultant further agrees to file, or shall cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Services. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
[SIGNATURES ON FOLLOWING PAGE]
Paramount PSA_Prof Liability (January 2025) 13
SIGNATURE PAGE FOR PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF PARAMOUNT
AND MUSEUM PROS, LLC.
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.
CITY OF PARAMOUNT CONSULTANT: MUSEUM PROS, LLC.
By:____________________________ By:____________________________ Brenda Olmos, Mayor MICHELLE REID, OWNER
By: ____________________________
DAVID REID, PARTNER
[Two corporate signatures required if corporation]
ATTEST:
By:___________________________
Heidi Luce, City Clerk
Paramount PSA_Prof Liability (January 2025) Exhibit - 1
EXHIBIT A
Scope of Services
Museum Pros, LLC - 509-863-3662 - museumprosllc.org
April 24, 2026
Chris Callard
Re: City of Paramount Community Center and Museum
Dear Chris,
Thank you for the opportunity to propose work with the City of Paramount. We feel our experience uniquely positions us to help bring your vision to reality. We look forward to working with you to imagine an engaging new museum space celebrating the region’s unique history.
We propose the following full service, design, fabrication, and installation scope of work:
• Collaborate with staff and stakeholders to complete content and storytelling; • Develop a full gallery concept, with emphasis on history delivered in a multi-use space; • Evaluate opportunities for new features and components; • Ensure content is inclusive of all ages, cultures, learning styles, and backgrounds; • Display artifacts and archival assets in support of partnering repositories; • Complete all approved designs, builds, and installation of the following:
o Bespoke metal framing system for signage, artifacts and other interpretive elements o Zamboni display system to protect the artifact from damage or misuse o All graphic design components and signage
o Display pedestals, artifact mounts, and protective, secure vitrines o Casework as needed
o Complete design, fabrication and installation of new components • Assist staff (Public Works) with hard construction needs (i.e.. elements requiring attachment to the building’s structure, lighting needs, and large artifact placement); • Deliver final reports, maintenance guide and original design files.
Terms of Agreement:
Duration: 1 May 2026 – 1 September 2026 (subject to change based on construction schedule, City approval of a defined scope, and artifact availability) Pricing: $ 81,000
Preferred payment terms: Progressive monthly
Pricing includes full-service design, fabrication and installation Travel and Per Diem is included
Museum Pros, LLC proposes completing the above-mentioned scope of work based on conversations, emails and other means of communication with City staff and stakeholders.
Museum Pros, LLC - 509-863-3662 - museumprosllc.org
Termination: Either party may terminate this agreement with 15 days’ written notice. If this agreement is terminated for any reason, Museum shall pay to the Contractor all undisputed amounts owed through the date of termination.
Status: It is understood that Museum Pros LLC is an independent contractor as defined by A.R.S. Section 23-902.
Contractor will provide signed IRS W9 Form and proof of insurance if requested.
Exclusions:
• If the City/Museum staff desires specialized equipment, security procedures, or cases for valuable artifacts above and beyond museum best-practices, Museum Pros, LLC may consult on acquisition of such but will not be responsible for providing specialized security devices or furnishings not already specified in this proposal.
• Museum Pros, LLC is not a general contractor and is not responsible for installation services that require attachment, securing or other means of installation directly to the building’s structure, flooring or roofing support systems. Museum Pros, LLC may consult on such work but will not be responsible for alterations to the existing building.
• Lights and lighting elements are excluded.
• Electrical work is excluded.
• Permits, Payment Bonds, Performance Bonds are excluded. • Due to the abbreviated timeline for deliverables, formal submittals and as-builts will not be provided.
We look forward to the opportunity to bring to life an exciting museum experience to the community of Paramount and the surrounding area by supporting your vision with creativity, craftsmanship, and care.
Respectfully,
Michelle R. Reid
Museum Pros, LLC
Museum Pros, LLC - 509-863-3662 - museumprosllc.org
• Project tasking is general in nature and relies on lead time and other factors. • Tasks and dates may change. Museum Pros, LLC will communicate regularly with City on changes and alterations to the dates and tasks shown above.
City of Paramount
Community Center and
Museum
11 May 2026
Full Gallery Option ($81,000)
Main Elements:
- Large metal frames that create scale and
support a variety of interpretive
content.
- Zamboni railing with heavy bases
- Dimensional back wall (orange) with
multiple 3D features
Pros:
- Strong visual impact
- Memorable visitor experience
- Excellent wayfinding and sightlines
- High engagement for young audiences
- Professional artifact presentation
- Adaptable for future growth
- Rich narrative potential
- Customization for the City of Paramount
- Fully ADA compliant
Cons:
- Higher cost for custom large-scale builds
- Complex fabrication
- Climbing risk remains despite deterrents
Note:
This design can be phased over two fiscal
years.
Paramount PSA_Prof Liability (January 2025) Exhibit B - 1
EXHIBIT B
Schedule of Rates/Payments
Consultant will invoice City on a monthly cycle, or otherwise as expressly provided in this Agreement. Consultant will include with each invoice a detailed progress report that indicates the amount of budget spent on each task, as applicable. Consultant will inform City regarding any out-of-scope work being performed by Consultant. Any other terms and conditions relating to the amount of compensation to be paid to Consultant are as follows:
Pricing: $ 81,000 total
Preferred payment terms: Progressive monthly
Pricing includes full-service design, fabrication and installation Travel and Per Diem is included
Paramount PSA_Prof Liability (January 2025) Exhibit C - 1
EXHIBIT C
INSURANCE
1. Time for Compliance. Consultant shall not commence work under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this section, or as may otherwise be permitted or required in writing by the City’s risk manager.
2. Types of Insurance Required. As a condition precedent to the effectiveness of this Agreement for work to be performed hereunder, and without limiting the indemnity provisions of the Agreement, the Consultant, in partial performance of its obligations under such Agreement, shall procure and maintain in full force and effect during the term of the Agreement the following policies of insurance. If the existing policies do not meet the insurance requirements set forth herein, Consultant agrees to amend, supplement or endorse the policies to do so.
A. Commercial General Liability: Commercial General Liability Insurance which affords coverage at least as broad as Insurance Services Office “occurrence" form CG 0001, or the exact equivalent, with limits of not less than $1,000,000 per occurrence and no less than $2,000,000 in the general aggregate. Defense costs shall be paid in addition to the limits. The policy shall contain no endorsements or provisions (1) limiting coverage for contractual liability; (2) excluding coverage for claims or suits by one insured against another (cross-liability); or (3) containing any other exclusion(s) contrary to the terms or purposes of this Agreement.
B. Workers' Compensation: Workers' Compensation Insurance, as required by the State of California and Employer's Liability Insurance with a limit of not less than $1,000,000 per accident for bodily injury and disease.
C. Professional Liability (Errors & Omissions): Consultant shall maintain professional liability insurance that covers the services to be performed in connection with this Agreement, in the minimum amount of $1,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this Agreement. If a “claims-made” policy is provided, it shall include an extended reporting period of not less than three (3) years.
D. Commercial Automobile Liability Insurance: Consultant shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned, or rented vehicles, in an amount not less than 1,000,000 combined single limit for each accident. The City of Paramount, its elected or appointed officers, officials, employees and volunteers shall be named as additional insureds on such policy.
E. Reserved.
F. For Commercial General Liability and Commercial Automobile Liability (CGL Coverage):
The City will be named as an additional insured, under the commercial general liability (“CGL”) insurance policy coverage, for all liability arising out of the operations by or on Paramount PSA_Prof Liability (January 2025) Exhibit C - 2 behalf of the named insured, and this CGL policy protects the additional insured, its officers, agents and employees against liability for personal and bodily injuries, deaths or property damage or destruction arising in any respect, directly or indirectly, in the performance of the contract.
(i) Each such CGL policy shall be endorsed with the following language: The City of Paramount, its elected or appointed officers, officials, employees and volunteers are included as insureds with regard to damages and defense of claims arising from: (a) activities performed by or on behalf of the Named Insured, including the insured's general supervision of the Named Insured, (b) products and completed operations of the Named Insured, or (c) premises owned, leased or used by the Named Insured. (ii) This CGL policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers. Any insurance maintained by the City, including any self-insured retention the City may have, shall be considered excess insurance only and shall not contribute with it. (iii) The inclusion of more than one insured shall not operate to impair the rights of one insured against another insured, and the coverages afforded shall apply as though separate policies had been issued to each insured.
(iv)The Additional Insured coverage under the Consultant’s policy shall be primary and non-contributory and will not seek contribution from the City’s insurance or selfinsurance and shall be at least as broad as CG 20 01 04 13.
G. Deductibles and Self-Insured Retentions: Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible, or require proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
3. Waiver of Subrogation. All policies of Commercial General Liability, Commercial Automobile Liability, and Worker’s Compensation shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against the City, its officials, officers, employees, and agents to the extent of such coverage.
4. Evidence of Insurance. The Consultant shall deliver redacted copies of the required policies or original certificates of insurance and redacted or specimen endorsements issued by their insurer. The Consultant and its insurer are solely responsible for ensuring that the required insurance complies with this Agreement and provides adequate coverage for all services performed. The Consultant shall procure insurance policies that meet the stated standards.
At least fifteen (15) days before any policy expires, or within a reasonable time after policy renewal, the Consultant shall provide evidence of renewal or replacement coverage. If any policy is canceled or reduced, the Consultant must file evidence of reinstatement or replacement coverage within ten (10) days of receipt of written notice of the change.
Paramount PSA_Prof Liability (January 2025) Exhibit C - 3 The City may request copies of insurance policies and endorsements for informational purposes only, without assuming any obligation to verify compliance or adequacy.
5. Failure to Maintain Coverage. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced immediately so as to avoid a lapse in the required coverage, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement effective upon notice.
6. Acceptability of Insurers. Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A- VII and authorized to transact business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.
7. Enforcement of Agreement Provisions (non-estoppel). Consultant acknowledges and agrees that actual or alleged failure on the part of the City to inform Consultant of noncompliance with any requirement imposes no additional obligation on the City nor does it waive any rights hereunder.
8. Requirements Not Limiting. Requirement of specific coverage or minimum limits contained in this Agreement are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance.
Paramount PSA_Prof Liability (January 2025) Exhibit C - 4 WORKER’S COMPENSATION INSURANCE CERTIFICATION
WORKERS' COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations: (ONE OF THE
PARAGRAPHS BELOW MUST BE CHECKED)
I have and will maintain a certificate of consent from the California Labor Commission to self-insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work to be performed under this Agreement. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work to be performed under this contract.
My workers' compensation insurance carrier and policy number are:
Carrier ____________________________________________
Policy Number ______________________________________
I certify that, in the performance of the work under this Agreement, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and I hereby agree to indemnify, defend, and hold harmless the City of Paramount and all of its officials, employees, and agents from and against any and all claims, liabilities, and losses relating to personal injury or death, economic losses, and property damage arising out of my failure to provide such worker’s compensation insurance. I further agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION COVERAGE IS
UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES.
By: _________________________________ Dated:______________, 20_________ To: Honorable City Council
From: John Moreno, City Manager
By: John King, AICP, Planning and Building
Director
Date: June 23, 2026
SUBJECT: ANNUAL PUBLIC ART WORKPLAN
BACKGROUND
The Paramount Municipal Code requires the City Council to approve an annual public art workplan. This plan recommends the use of public art fund monies consistent with the purpose of the Art in Public Places section of the Code, including the administrative costs of the public art program annually, staff support and related expenses; curatorial services; documentation; publicity, community education, and any other services or programs in accordance with the intent of public art.
Public art in Paramount is funded by development fees applicable to construction projects valued at $100,000 or more. For Fiscal Year (FY) 2027, additional Public Art Program revenues are anticipated from upcoming development projects, including the self-storage facility at Garfield Avenue and Petterson Lane and Dutch Bros Coffee.
The Public Art Advisory Committee reviewed the draft workplan at its May 28, 2026 meeting and recommended approval.
DISCUSSION
The following workplan for 2026-2027 Fiscal Year is proposed:
• Spane Learning Center Mural – artist will complete project in summer 2026 following City Council approval of revised artwork.
BUDGETED AMOUNT: $10,000
• Museum/Community Center Wall Artwork – Public Art Advisory Committee will recommend finalists to City Council; the artist will complete the project by fall 2026 following City Council approval of artwork.
BUDGETED AMOUNT: $65,000
• COVID-19 Memorial Sculpture – Public Art Advisory Committee will review applicant proposals upon receipt of proposals following discussion of project and call to artists is released; City Council will approve artist in fall 2026 and work to begin thereafter.
BUDGETED AMOUNT: $100,000
Agenda Report June 23, 2026
PUBLIC ART WORKPLAN Page 2
• Murals - Hay Tree Public Market Exterior. City to solicit proposals in summer 2026.
BUDGETED AMOUNT: $30,000
• Paramount Paints Refurbishment – Contract with existing artists to repair/rehab faded/damaged utility box art. Ongoing refurbishment program.
BUDGETED AMOUNT: $10,000
• Paramount Paints Wall Mural/Utility Box – future wall mural projects.
BUDGETED AMOUNT: $85,000
• Hay Tree Event – cultural event administered by Community Services Department.
BUDGETED AMOUNT: $8,000
• Museum Historical Displays – professionally designed displays and content for Paramount Museum administered by Community Services Department.
ESTIMATED AMOUNT: $89,100 (not currently in Fiscal Year 2027 budget) • Go Store It Mural – Public Art Advisory Committee will review applicant proposal upon receipt and make recommendation for City Council review.
BUDGETED AMOUNT: Not applicable (developer to compensate artist directly) TOTAL AMOUNT: $397,100
FISCAL IMPACT
An additional budget adjustment of $89,100 from the Public Art Fund (Fund 292) is needed to implement the proposed Annual Public Art Workplan, for a total Fiscal Year 2026-2027 Public Art Program budget of $397,100. The Fiscal Year 2026-2027 Budget currently includes $308,000 in Public Art Fund appropriations for projects included in the workplan; however, the proposed Museum Historical Displays project was not included in the adopted budget.The City Council considered a budget adjustment earlier this evening with an agreement with Museum Pros, an exhibit consulting company specializing in custom displays.
Budget Adjustment (Considered with Agreement with Museum Pros) Fund Division Account Service Description Request
Amount
Public Art
Fund (292)
9550 (CIP) 292-9550-7111 Museum Historical
Displays
$89,100
Agenda Report June 23, 2026
PUBLIC ART WORKPLAN Page 3
VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity, and guidelines; and provide the framework for policy decisionmaking. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No. 2: Community Health - Provide diverse recreational and cultural amenities that support healthy lifestyles and a sense of community; and No. 6: Efficient, Effective, and Fiscally Responsible - Deliver an efficient and effective City government in a fiscally responsible, transparent and collaborative manner.
RECOMMENDED ACTION
Approve the Fiscal Year 2026-2027 Public Art Workplan.
To: Honorable City Council
From: John Moreno, City Manager
By: Heidi Luce, City Clerk
Date: June 23, 2026
SUBJECT: ADOPTION OF A TECHNOLOGICAL DISRUPTION POLICY FOR
HYBRID PUBLIC MEETINGS
BACKGROUND
The Ralph M. Brown Act establishes California's open meeting requirements for local legislative bodies, ensuring that public business is conducted openly and transparently.
During the COVID-19 pandemic, temporary emergency provisions allowed local agencies to conduct meetings remotely while maintaining public access. Following the expiration of those emergency authorities, the Legislature adopted several teleconferencing options to facilitate public participation.
Senate Bill 707 (Durazo), signed into law in 2025, further revised the Brown Act by creating a more permanent framework for remote public access to meetings. The legislation seeks to increase civic engagement by allowing members of the public to observe and participate in local government meetings through telephone and internetbased platforms while maintaining transparency and accountability.
Starting on July 1, 2026, public meetings held by an eligible legislative body are required to include an opportunity for members of the public to attend via a two-way telephonic service or a two-way audiovisual platform (such as Zoom), commonly referred to as a “hybrid meeting.”
In addition to modernizing Brown Act requirements by establishing permanent procedures for remote public access, SB 707 requires agencies to adopt procedures that establish how meetings will be managed when a technological disruption occurs.
DISCUSSION
Purpose of the Policy
The proposed Technological Disruption Policy establishes procedures to ensure that members of the public retain meaningful access to meetings when remote participation options are offered.
Agenda Report June 23, 2026
TECHNOLOGICAL DISRUPTION POLICY Page 2
The policy provides direction to City staff and the City Council regarding:
• Identification of technological disruptions.
• Temporary suspension of meeting proceedings when necessary. • Restoration of public access.
• Continuation, postponement, or adjournment of meetings when disruptions cannot be resolved.
• Documentation of disruptions in meeting records.
Definition of Technological Disruption
For purposes of the policy, a technological disruption includes any interruption or failure of internet, telephone, audiovisual, streaming, or other technology used to provide public access or public comment opportunities during a meeting. Examples include:
• Loss of internet connectivity.
• Failure of the virtual meeting platform.
• Audio transmission failures.
• Video transmission failures.
• Public inability to access remote participation links. • Power outages affecting meeting technology.
Proposed Procedures
The proposed policy establishes the following procedures:
1. Temporary Suspension of Proceedings
When City staff becomes aware of a technological disruption that prevents remote public participation, the presiding officer shall suspend the meeting for a minimum of one hour to allow staff to assess and restore service.
2. Restoration Efforts
Staff shall make reasonable efforts to restore remote access, including:
• Re-establishing internet connections.
• Restarting meeting software or equipment.
• Providing alternative access methods when available.
• Communicating status updates through available channels.
3. Determination to Continue or Adjourn
If the disruption cannot be resolved within the one hour period of time, the legislative body may:
Agenda Report June 23, 2026
TECHNOLOGICAL DISRUPTION POLICY Page 3
• Continue the meeting if the following findings are made upon motion, second and roll call vote: (i) that good faith efforts to restore the telephonic or internet service have been made in accordance with the City’s Technological Disruption Policy for Hybrid Public Meetings; and (ii) that the public interest in continuing the meeting outweighs the public interest in remote public access;
• Continue the recess until service is restored; or
• Adjourn and continue the remaining business to a future meeting date.
4. Public Comment Protection
No action shall be taken on an agenda item during a technological disruption if members of the public are unable to access the meeting or provide public comment as required by law.
5. Recordkeeping
Any technological disruption and resulting actions taken by the legislative body shall be documented in the meeting minutes.
FISCAL IMPACT
There is no fiscal impact.
VISION, MISSION, VALUES, AND STRATEGIC OUTCOMES
The City’s Vision, Mission, and Values set the standard for the organization, establish priorities, uniformity and guidelines; and provide the framework for policy decision making. The Strategic Outcomes were implemented to provide a pathway to achieving the City’s Vision. This item aligns with Strategic Outcome No 6: Efficient, Effective, and Fiscally Responsible - Deliver an efficient and effective City government in a fiscally responsible, transparent and collaborative manner. 1: Safe Community - Provide a safe place to live, work, and visit.
RECOMMENDED ACTION
Adopt Resolution No. 26:026, adopting a technological disruption policy for hybrid public meetings.
CITY OF PARAMOUNT
LOS ANGELES COUNTY, CALIFORNIA
RESOLUTION NO. 26:026
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARAMOUNT
ADOPTING A TECHNOLOGICAL DISRUPTION POLICY FOR PUBLIC
MEETINGS CONDUCTED PURSUANT TO THE RALPH M. BROWN ACT
WHEREAS, the Ralph M. Brown Act (Government Code Section 54950 et seq.) requires that meetings of local legislative bodies be open and public and that members of the public be provided opportunities to participate in the conduct of local government business; and
WHEREAS, the California Legislature enacted Senate Bill 707 (Durazo), which amended provisions of the Brown Act relating to teleconferenced and hybrid public meetings; and
WHEREAS, Senate Bill 707 requires local agencies utilizing remote public participation technology to establish procedures for addressing technological disruptions that interfere with the public's ability to observe, access, or participate in public meetings; and
WHEREAS, the City Council finds that providing clear procedures for responding to technological disruptions promotes transparency, protects public participation rights, and ensures compliance with state law; and
WHEREAS, the City Council desires to adopt a Technological Disruption Policy applicable to meetings of the City Council and all legislative bodies subject to the Brown Act; and
WHEREAS, the proposed Technological Disruption Policy is attached hereto as Exhibit A and incorporated herein by this reference.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARAMOUNT AS FOLLOWS:
SECTION 1. The above recitations are true and correct.
SECTION 2. The City Council hereby adopts the Technological Disruption Policy attached as Exhibit A.
SECTION 3. The Technological Disruption Policy shall apply to all meetings of the City Council for which remote public access or participation is provided.
RESOLUTION NO. 26:015