Central Park Apartments
Mitigation Monitoring and Reporting Program
prepared by
City of Pasadena Planning & Community Development
175 North Garfield
Pasadena, California 91109
prepared with the assistance of
Impact Sciences, Inc.
811 W. 7th Street, Suite 200
Los Angeles, California 90017
January 2022
$77$&+0(17&

Central Park Apartments
Sustainable Communities Environmental Assessment MMRP-1 Mitigation Monitoring and Reporting Program
This document is the Mitigation Monitoring and Reporting Program (MMRP) for the Central Park Apartments Project (proposed project) proposed in the City of Pasadena. The purpose of the MMRP is to ensure that the required mitigation m easures identified in the Sustainable Communities Environmental Assessment (SCEA) are implemented as part of the overall project implementation. In addition, the MMRP provides feedback to agency staff and decision-makers during project implementation, and identifies the need for enforcement action before irreversible environmental damage occurs.

The following table summarizes the mitigation measures for each issue area identified in the SCEA for the proposed project. The table identifies the actions required for the measure to be implemented, the time at which the monitoring is to occur, the monitoring frequency, and the agency or party responsible for ensuring that the monitoring is performed. In addition, the table includes columns for compliance verification. These columns will be filled out by the monitoring agency or party and would document monitoring compliance. Where an impact was identified to be less than significant, no mitigation measures were required.

This MMRP will be used by City staff or the City’s consultant to determine compliance with permit conditions. Violations of these conditions may cause the City to revoke the operating permit.

Central Park Apartments
Sustainable Communities Environmental Assessment MMRP-3 Mitigation Measure/Condition of Approval Action Required When
Monitoring
to Occur
Monitoring
Frequency
Responsible
Agency or Party
Compliance Verification
Initial Date Comments

CULTURAL RESOURCES
Pasadena General Plan EIR Mitigation Measure: 4.1 : If cultural resources are discovered during construction of land
development projects in Pasadena that may be eligible for listing in the California Register for Historic Resources, all ground disturbing activities in the immediate vicinity of the find shall be halted until the find is evaluated by a Registered Professional Archaeologist. If testing determines that significance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; and provide a comprehensive final report including site record to the City and the South Central Coastal Information Center at California State University Fullerton. No further grading shall occur in the area of the discovery until Planning Department approves the report.

If archeological
resources are
discovered on-site
during
construction, verify
that construction
activities are halted
and the find is
evaluated by a
qualified
archaeologist
Field verification
during
construction
Field verification
periodically during
construction
City of
Pasadena
Planning &
Community
Development
Department

NOISE
MM NOI-1: Prior to approval of grading plans and/or prior to issuance of demolition, grading and building permits, and to the satisfaction of the City of Pasadena, the applicant shall retain a Professional Structural Engineer with experience in structural vibration analysis and monitoring for historic buildings and a Project Historical Architect with similar experience as a team to ensure project construction-induced vibration levels do not expose the existing Green Hotel Apartments or the restaurant building at 84 South Fair Oaks Avenue to vibration levels of 0.12 ppv in/sec or greater. The Professional Structural
Engineer/Project Historical Architect team shall perform the following tasks:
x Review the project plans for demolition and construction; x Survey the project site and the existing Green Hotel
Apartments and restaurant buildi ng at 84 South Fair Oaks Verify that a
Professional
Structural Engineer
with experience in
structural vibration
analysis and
monitoring for
historic buildings
and a Project
Historical Architect
with similar
experience are
retained by the
applicant to
prepare the
required
documentation.

Verify that an on-
site vibration
Verification prior
to grading permit
issuance; review
and approval of
of required
documentation.

Field verification
during ground
disturbance
Verification once
prior to grading
permit issuance;
Field verification
periodically during
ground
disturbance
City of
Pasadena
Planning &
Community
Development
Department

Central Park Apartments
Sustainable Communities Environmental Assessment MMRP-4 Mitigation Measure/Condition of Approval Action Required When
Monitoring
to Occur
Monitoring
Frequency
Responsible
Agency or Party
Compliance Verification
Initial Date Comments
Avenue, including photographic and/or videographic
documentation and geological testing, if required; and
x Prepare and submit a report to the Director of Planning and Community Development to include, but not be limited to, the following:
o Description of existing conditions at the existing Green Hotel Apartments and restaurant building at 84 South
Fair Oaks Avenue, including photographic and/or
videographic documentation;
o Vibration level limits based on building conditions, soil conditions, and planned demolition and construction
methods to ensure vibration levels would be below

0.12 ppv in/sec, the potential for damage to the
existing Green Hotel Apartments and restaurant
building at 84 South Fair Oaks Avenue;
o Specific measures to be taken during construction to
ensure the specified vibration level limits are not
exceeded; and
o A Prepare and submit a monitoring plan to be
implemented during demolition and construction that
includes post-construction and post-demolition
surveys of the existing Green Hotel Apartments and
restaurant building at 84 South Fair Oaks Avenue. The
plan should include, but not be limited to, monitoring
instrument specificatio ns, instrument calibration
certificates, list of exact monitoring locations, data
collection protocol, alarming and alerting protocol,
reporting protocol, and maintenance and service
outage protocol. Any of the measures can be removed
when no longer necessary to achieve the 0.12 ppv
in/sec threshold of structure damage at the existing
Green Hotel Apartments and restaurant building at 84
South Fair Oaks Avenue.
monitor is
obtained; Field
verify that monitor
is on-site during
ground disturbance

Central Park Apartments
Sustainable Communities Environmental Assessment MMRP-5 Mitigation Measure/Condition of Approval Action Required When
Monitoring
to Occur
Monitoring
Frequency
Responsible
Agency or Party
Compliance Verification
Initial Date Comments
x Examples of measures that may be specified for
implementation during demolition or construction include, but are not limited to:
o Prohibition of certain types of impact equipment;
o Requirement for lighter tracked or wheeled
equipment;
o Specifying demolition by non-impact methods, such as
sawing concrete;
o Phasing operations to avoid simultaneous vibration
sources; and
o Installation of vibration measuring devices to guide
decision making for subsequent activities. Monitoring
shall be conducted, at minimum, during all ground-
disturbing significant impa ct construction activities
(i.e., demolition, shoring excavation, and foundation
work). Warning thresholds, as specified in the
monitoring plan, shall be below the specified vibration limits to allow the Contractor to take the necessary
steps to reduce vibration, including but not limited to halting/staggering concurrent activities, utilizing
quieter or lower-vibratory techniques, or reducing the
speed or intensity of equipment. A monitoring record
that documents all alarms and includes information
regarding compliance with these vibration measures
shall be provided to the City of Pasadena upon request.

MM NOI-2: To the satisfaction of the City of Pasadena, in the unanticipated event of discovery of vibration-caused damage, the Professional Structural Engineer and the Project Historical Architect shall document any damage to the existing Green Hotel Apartments and/or restaurant buildi ng located at 84 South Fair Oaks Avenue caused by construction of the project and shall recommend necessary repairs. Until the conclusion of vibration causing activities, a report from the Professional Structural Verify that an on-
site vibration
monitor is
obtained; Field
verify that monitor
is on-site during
Verification prior
to grading permit
issuance; Field
verification
during ground
disturbance.

Verification of
repairs of any
repairs to
Verification once
prior to grading
permit issuance;
Field verification
periodically during
ground
disturbance.

City of
Pasadena
Planning &
Community
Development
Department

Central Park Apartments
Sustainable Communities Environmental Assessment MMRP-6 Mitigation Measure/Condition of Approval Action Required When
Monitoring
to Occur
Monitoring
Frequency
Responsible
Agency or Party
Compliance Verification
Initial Date Comments
Engineer or Project Historical Architect shall be submitted every 90 days to the City of Pasadena documenting the presence or absence of damage, and, if needed, the status of any required repairs. The project applicant shall be responsible for any repairs associated with vibration-caused damage as a result of
construction of the project. Any such repairs shall be undertaken and completed as required to conform to the Secretary of the Interior’s Standards for the Treatment of Historic Properties (36 Code of Federal Regulations 68), and shall apply the California Historical Building Code (California Code of Regulations, Title 24, Part 8) and other applicable codes.
ground
disturbance.

Verify that a
Professional
Structural Engineer
with experience in
structural vibration
analysis and
monitoring for
historic buildings
and a Project
Historical Architect
with similar
experience are
retained by the
applicant to
prepare the
required
documentation.
historic
structures
associated with
vibration caused
damage.

TRIBAL CULTURAL RESOURCES
MM TCR-1: During grading and excavation, a monitor meeting the satisfaction of the Gabrieleno Band of Mission Indians – Kizh Nation shall be present. Consistent with Mitigation Measure 4-1 in the Pasadena General Plan EIR, if Native American artifacts are found, all ground disturbing activities in the immediate vicinity of the find shall be halted until the find is evaluated by a Registered Professional Archaeologist. If testing determines that
significance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon data as applicable, and other special studies; and provide a comprehensive final report, including site record to the City and the South Central Coastal Informat ion Center at California State University, Fullerton. No further grading shall occur in the area of the discovery until the Planning Department approves the report.

Subsequently, the find shall be turned over to the tribe of the resource’s origin. In addition, any cultural resources found shall Verify that Native
American monitor
is obtained; Field
verify that monitor
is on-site during
ground disturbance
Verification prior
to grading permit
issuance; Field
verification
during ground
disturbance
Verification once
prior to grading
permit issuance;
Field verification
periodically during
ground disturbance
City of
Pasadena
Planning &
Community
Development
Department

Central Park Apartments
Sustainable Communities Environmental Assessment MMRP-7 Mitigation Measure/Condition of Approval Action Required When
Monitoring
to Occur
Monitoring
Frequency
Responsible
Agency or Party
Compliance Verification
Initial Date Comments
be treated in accordance with regulatory requirements. Grading and excavation may continue around the isolated area of the find so long as the activities do not impede or jeopardize the protection and preservation of any cultural resources as determined by the Registered Professional Archaeologist.

Central Park Apartments
Sustainable Communities Environmental Assessment MMRP-8 This page intentionally left blank.