Cities Index.
AR 9 Attachment B comb

Pasadena City Council
April 11, 2022

Document
AR 9 Attachment B comb
Meeting
April 11, 2022
Body
Pasadena City Council
Pages
44
Original file
213.8 MB
Text extracted from the city's file for reading and search. Open the original on ww2.cityofpasadena.net. That file is the official record.

The human ear perceives a 10 dB(A) increase in sound level as a doubling of sound.

The City has jurisdiction over noise regulation, as stated in the City’s Municipal Code, Title 9, Chapter 36 Noise Restrictions (Noise Ordinance). The Noise Ordinance is intended to enforce the City’s policy to prohibit “unnecessary, excessive, and annoying noises from all sources.” The City’s noise ordinance includes specific provisions regarding construction noise. Section 9.36.070 of the Municipal Code prohibits the operation of construction equipment and construction activity except from 7:00 AM to 7:00 PM Monday through Friday, and from 8:00 AM to 5:00 PM on Saturday in or within 500 feet of a residential district.

Operation of construction equipment is prohibited on Sunday and on defined holidays. Section 9.36.080 of the Municipal Code prohibits the operation of powered construction equipment that generates a noise level of 85 dB(A) when measured within a radius of 100 feet from such equipment. The Central Park Apartments Project would comply with all City noise regulations.
8 California Department of Transportation, Technical Supplement to the Traffic Noise Analysis Protocol. September 2013.

7.0. Responses to Comments
Impact Sciences, Inc. 7.0-47 Central Park Apartments
Sustainable Communities Environmental Assessment January 2022 Construction noise levels vary from hour-to-hour and day-to-day, depending on the equipment in use, the operations being performed, and the distance between the source and receptor. Construction of the proposed project and the related projects would generate noise that could expose nearby receptors to elevated noise levels that may disrupt communication and routine activities. The magnitude of the impact would depend on the type of construction activity, equipment, duration of the construction, distance between the noise source and receiver, and intervening structures. As noted above, section 9.36.080 of the Pasadena Municipal Code requires that construction equipment noise not exceed 85 dB(A) at 100 feet.

As shown in Table 4.13-2 of the SCEA, which lists the construction equipment that would be used for the Proposed Project for various construction phases and their noise levels for a reference receptor at 100 feet, the loudest single piece of construction equipment would be anticipated to have a maximum value of 83.6 dBA at 100 feet. All other anticipated equipment to be used for the Proposed Project would have a lower noise level, and thus all would be below the City’s threshold.

It is assumed that the nearest Related Project, located at 33-45 W. Green Street, approximately 350 feet from the project site9, would generate a similar maximum construction noise level as the Proposed Project.

As such, the construction noise level from the nearest Related Project would be 83.6 dBA at 100 feet, again, below the City’s threshold. The nearest sensitive receptor, the Green Hotel Apartments building is approximately 300 feet from the nearest Related Project construction activity. At this distance, construction noise would be reduced to approximately 71 dBA.10 Additionally, the nearest Related Project would be shielded from the Green Hotel Apartments building by existing buildings along both Fair Oaks Avenue and Green Street, which would further reduce construction noise by at least 10 dBA, resulting in a final construction noise level of 61 dBA at the Green Hotel Apartments building.

These temporary construction noise level increases would not exceed the requirements specified in Pasadena Municipal Code section 9.36.080. As a result, cumulative temporary construction noise impacts on ambient noise levels would be considered less than significant. 9 The other three Related Projects are approximately 500, 700, and 1,000 feet from the Project Site. Construction noise impacts associated with a particular development are generally localized and are not considered to be cumulatively considerable beyond 500 feet from the construction site or along roadways by which construction traffic would access the site.
10 Sound generated by a point source typically diminishes (attenuates) at a rate of 6 dB(A) for each doubling of distance from the source to the receptor at acoustically “hard” sites and 7.5 dB(A) at acoustically “soft” sites. For example, if a noise source produces a noise level of 89 dB(A) at a reference distance of 50 feet, the noise level would be 83 dB(A) at a distance of 100 feet from the noise source, 77 dB(A) at a distance of 200 feet, and so on. (Federal Highway Administration, Highway Noise Fundamentals, (1980) 97. Examples of “hard” or reflective sites include asphalt, concrete, and hard and sparsely vegetated soils. Examples of acoustically “soft” or absorptive sites include soft, sand, plowed farmland, grass, crops, heavy ground cover, etc.)

7.0. Responses to Comments
Impact Sciences, Inc. 7.0-48 Central Park Apartments
Sustainable Communities Environmental Assessment January 2022

7.10 DISCUSSION OF OPERATIONAL NOISE IMPACTS
Several comments were submitted regarding the construction of the Proposed Project creating ‘a threesided enclosed 75-90 foot tall building canyon’ and the potential for this to create a significant noise impact due to the volume of traffic entering and exiting via the Dayton Street driveway.

As discussed in Section 4.13 Noise of the SCEA Checklist Analysis prepared for the Proposed Project, the City of Pasadena’s Transportation Data Management System shows that Dayton Street between Fair Oaks Avenue and Raymond Avenue has a traffic volume of approximately 70 vehicles during the A.M. peak hour, and 118 vehicles during the P.M. peak hour.11 It takes a doubling of traffic volume to increase noise levels by 3 dB(A). Studies done by the California Department of Transportation (Caltrans)12 have shown that a 3 dB(A) increase in sound level pressure is barely detectable by the human ear. As such, the project’s addition of approximately 52 A.M. peak hour trips and 73 P.M. peak hour trips would not increase in traffic volumes enough to cause a significant audible increase in traffic noise.

Further, even if the receptor with the lowest ambient noise levels (Central Park 55.8 dBA Leq) is assumed to represent the noise levels at the Green Hotel Apartments, the 866 daily vehicles entering and exiting the parking garage would not substantially elevate ambient noise levels. This is due to three primary reasons.

First, the 866 daily vehicle trips generated by the proposed project would average 52 vehicles during A.M. peak hours, 73 vehicles during P.M. peak hours, and would dwindle down to 20 vehicles during nighttime hours. Using time-of-day data from the Institute of Traffic Engineers (assuming land use code 221- Multifamily Housing Mid-Rise), during A.M. peak hours, this is an average of less than one vehicle per minute; during P.M. peak hours, this is an average of 1.22 vehicles per minute, and one vehicle every three minutes during the night. This volume of vehicle travel is not enough to substantially elevate noise levels.

Second, these vehicles would be traveling at a slow rate of speed as they enter and exit the parking garage, navigating a turn from the driveway to the garage. Slower vehicles generate minimal noise from tires traveling over hardscape on a driveway. Finally, these vehicles would be entering a garage that would be 150 feet south of the Green Hotel Apartments. At that distance, low noise levels from vehicles entering and exiting the garage would be substantially attenuated, as noise can decrease by 6 dBA with each doubling of distance.

To confirm this, an analysis was run using the Federal Transit Administration’s Noise Impact Assessment spreadsheet (included as Appendix J, Supplemental Noise Analysis to this SCEA), a tool that calculates the traffic noise generated from a project site, which takes into consideration the number of vehicles per 11 City of Pasadena, Transportation Data Management System. Available at:
https://pasadena.ms2soft.com/tcds/tsearch.asp?loc =Pasadena&mod=. 12 California Department of Transportation, Technical Noise Supplement to the Traffic Noise Analysis Protocol, 2013.

7.0. Responses to Comments
Impact Sciences, Inc. 7.0-49 Central Park Apartments
Sustainable Communities Environmental Assessment January 2022 hour during daytime and nighttime hours, which indicates that there would be less than a 1 dBA change in ambient noise levels at the Green Hotel Apartments. As discussed above, as this increase would be less than 3 dBA, this increase in operational traffic would be inaudible to the nearby residents of the Hotel Green Apartments and impacts would be less than significant.

In addition, neither CEQA nor the City of Pasadena have thresholds specific to an increase in reflected noise as a result of a ‘canyon’ created by the Proposed Project and the existing buildings, and there are no studies or data to support this effect. As such, any further analysis would be speculative, and not required per CEQA Guidelines Section 15145 as an analysis need not engage in "sheer speculation" as to future environmental consequences.

7.0. Responses to Comments
Impact Sciences, Inc. 7.0-50 Central Park Apartments
Sustainable Communities Environmental Assessment January 2022

7.11 EMERGENCY (FIRE DEPARTMENT) ACCESS
Several comments were submitted regarding the project having inadequate Fire Department access in case of emergencies. As discussed in the SCEA Environmental Checklist, Section 4.17, Transportation, the ingress and egress for the site have been evaluated by the PasDOT and found to be adequate for emergency access and/or access to nearby uses. The project does not involve the elimination of a throughroute, does not involve the narrowing of a roadway, and all proposed roadways, access roads and drive lanes meet the Pasadena Fire Department’s access standards. More specifically, commenters were concerned about access to the site from Dayton Street. In specific discussions with the Pasadena Fire Department regarding this specific street, it was confirmed that the Fire Department currently is able to use Dayton Street as a throughfare when that is the best route for responding (including being able to access the south side of the Castle Green if necessary), and the project will not impact such access at all. In addition, the change in traffic volumes on Dayton Street and Fair Oaks Avenue will not impact the Fire Department’s ability to provide adequate emergency access to the project site and Castle Green, and will not impact the Fire Department’s ability to utilize the Fire Station traffic signal on Fair Oaks Avenue south of the project site, which is controlled by Fire Department personnel to stop traffic, to provide emergency services to its service area. The above statements were confirmed by Pari Bagayee, Supervising Fire Plans Examiner, and Deputy Chief/Fire Marshal, Anthony James, Fire and Environmental Safety Division of the Pasadena Fire Department via personal communications on July 7, 2021 and October 15, 2021, respectively
Further, the Project must comply with all State and local Building, Fire and Safety Codes, and all Project plans will be subject to review and approval by the Public Works and the Transportation Departments, and the Building Division and Fire Department. Therefore, there would be no significant impacts related to inadequate emergency access.

7.0. Responses to Comments
Impact Sciences, Inc. 7.0-51 Central Park Apartments
Sustainable Communities Environmental Assessment January 2022

7.12 RESPONSES TO TRANSPORTATION-RELATED COMMENTS
Several comments were submitted regarding the “Outside of CEQA” traffic analysis information that was included in the SCEA. The “Outside of CEQA” traffic analysis focuses on traffic congestion and automobile delay, which are not environmental impacts that may be addressed by CEQA, per SB 743. Therefore, the comments received in this regard are not relevant to the transportation analysis in the SCEA, which followed the City’s guidelines for addressing transportation impacts in CEQA documents consistent with SB 743.

Refer to the Agenda and supporting documentation presented at the November 3, 2014, City Council meeting for a detailed explanation about how the review of traffic impacts has changed since the EIR for the previous project was prepared, specifically the purpose of, and adopted guidelines for the “Outside of CEQA” traffic analysis.1314
Traffic Safety Response:

Several comments were received regarding the safety of street intersections in the vicinity of the project site, particularly the intersection of Fair Oaks Avenue at Dayton Street. Comments were received specifically noting the geometry of the offset intersection at Fair Oaks Avenue and Dayton Street. It should be noted that offset intersections in and of themselves are not more inherently unsafe than standard fourlegged intersections. Every intersection has unique circumstances that can contribute to the intersection’s safety and crash potential. This project does not alter the geometry of the intersection.

In addition, the City of Pasadena Department of Transportation (DOT) went the extra step of analyzing the intersections of Fair Oaks Avenue at Dayton Street and Raymond Avenue at Dayton Street to determine if a traffic signal would be installed based on traffic signal warrants in the California Manual of Uniform Traffic Control Devices, taking into account the added traffic volumes and pedestrian volumes. The analyses included a review of the existing vehicular and pedestrian traffic volumes, projected traffic volumes, and safety records at the intersections. For Fair Oaks Avenue at Dayton Street, the existing traffic volume and projected traffic volume from the development at 86 S Fair Oaks Avenue did not meet any of the vehicular/pedestrian volume warrants. The intersection had four collisions in the past five years and therefore did not meet the warrant for a traffic signal based on crash history. For Raymond Avenue at Dayton Street, the existing traffic volume and projected traffic volume from the development at 86 S Fair Oaks Avenue did not meet any of the vehicular/pedestrian volume warrants. The intersection had no 13 The full City Council Agenda for November 3, 2014, including Item 15, NEW TRANSPORTATION

PERFORMANCE MEASURES FOR TRANSPORTATION IMPACT ANALYSIS AND THRESHOLDS OF SIGNIFICANCE FOR CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) with links to all of the related reports is available on-line at: https://ww2.cityofpasadena.net/2014%20Agendas/Nov_03_14/agenda.asp 14 Staff Report available on-line at:
https://ww2.cityofpasadena.net/2014%20Agendas/Nov_03_14/AR%2015.pdf

7.0. Responses to Comments
Impact Sciences, Inc. 7.0-52 Central Park Apartments
Sustainable Communities Environmental Assessment January 2022 collisions in the past five years and therefore did not meet the crash warrant. Therefore, based on the projected traffic/pedestrian volumes and collision history, the intersections of Fair Oaks Avenue at Dayton Street and Raymond Avenue at Dayton Street do not warrant a traffic signal and do not present a potential public safety hazard.

DOT would not install a new marked crosswalk across Fair Oaks Avenue without a traffic signal. In addition to not meeting the signal warrants at the Fair Oaks Avenue at Dayton Street intersection, there are significant design issues for a signal because of the existing driveway, existing transit stop, and locations of the existing Fire Station signals south of the east leg of the intersection. With the high traffic volume and 35 miles per hour (mph) speed along Fair Oaks Avenue, pedestrians shall utilize the signalized Fair Oaks Avenue at Green Street intersection located approximately 250 feet from the intersection of Fair Oaks Avenue at Dayton Street for a safer and protected crossing across Fair Oaks Avenue. Also, due to the high traffic volumes, street width, and conflict points along Fair Oaks Avenue, installation of bicycle lanes along Fair Oaks Avenue adjacent to the project is not recommended.

7.0. Responses to Comments
Impact Sciences, Inc. 7.0-53 Central Park Apartments
Sustainable Communities Environmental Assessment January 2022

7.13 ADDITIONAL INFORMATION PROVIDED BY THE PROJECT APPLICANT Following the release of the SCEA for public review in March 2021, the Project Applicant provided additional clarifying exhibits. These exhibits are provided in this SCEA as informational items; they do not change any of the previous analysis or findings of the SCEA.

The height study exhibits (Figures 7.13-1a and 7.13-1b) demonstrate that the proposed project would be shorter than both the existing Green Hotel and Castle Green structures.

The distance study exhibits (Figures 7.13-2a and 7.13-2b) show the distances of the proposed project construction site to the existing buildings. This is relevant to the construction noise analysis; refer to Section

4.13, Noise, for a discussion of construction noise.

The shadow studies (Figures 7.13-3a and 7.13-3b) demonstrate the extent to which the existing buildings, particularly Hotel Green, would be shaded by the proposed project throughout the day on both the summer and winter solstices. As a reminder, Senate Bill 743, signed into law in September 2013, made several changes to CEQA for projects located in areas served by transit (i.e., TPAs). While the thrust of SB 743 addressed a major overhaul on how transportation impacts are evaluated under CEQA, it also limited the extent to which aesthetics and parking are defined as impacts under CEQA. Specifically, Section 21099 (d)(1) of the Public Resources Code (PRC) states that a project's aesthetic and parking impacts shall not be considered a significant impact on the environment if the project is located on an infill site within a transit priority area. As discussed in Section 2.0, Project Description, the project site is surrounded by existing development, thus qualifying the project site as an ‘infill’ site. In addition, the project consists of a mixeduse residential community. Further, the Los Angeles County Metropolitan Transportation Authority (Metro) Del Mar L Line (formerly known as the Gold Line) Light Rail Station is located less than a quarter of a mile to the southeast of the project site along Raymond Avenue just north of Del Mar Boulevard and the Memorial Park Station is located less than a half mile to the northeast of the project site along Holly Street at the terminus of N. Arroyo Parkway. For these reasons, the proposed project qualifies for SB 743 exemption from aesthetic and parking impacts, and these exhibits related to shade/shadow are provided for informational purposes only.

The turn analysis study (Figure 7.13-4) demonstrates the ability of a single unit delivery truck to successfully access the loading lock bay of the proposed project.


 

 

 

 

 

 

  



   

 
  $//0($685(0(1760$'()5207+(/2:(6732,17$7*5$'(/2&$7('$77+(6287+($67&251(52)7+(6,7( Height Study
FIGURE 7.13-1a
1136.004•11/2021
SOURCE: Architectural Resources Group, Inc., October 2021. 
 

 

 

 

 

 
 

 



   

 
  $//0($685(0(1760$'()5207+(/2:(6732,17$7*5$'(/2&$7('$77+(6287+($67&251(52)7+(6,7( Height Study
FIGURE 7.13-1b
1136.004•11/2021
SOURCE: Architectural Resources Group, Inc., October 2021. 












&$67/(*5((1




*5((1+27(/$3$570(176
6)$,5
2$.6












 

 









 



























  

   
 
   Distance Study
FIGURE 7.13-2a
1136.004•11/2021
SOURCE: Architectural Resources Group, Inc., October 2021. 

   









  



    

 













































 















  


  
  
&$67/(*5((1
*5((1+27(/$3$570(176
6)$,5
2$.6

83 
  
  

   
 

  Distance Study
FIGURE 7.13-2b
1136.004•11/2021
SOURCE: Architectural Resources Group, Inc., October 2021. 
816

   
     
 

  
Shadow Study
FIGURE 7.13-3a
1136.004•11/2021
SOURCE: Architectural Resources Group, Inc., October 2021. 
816

 
       
  

 
Shadow Study
FIGURE 7.13-3b
1136.004•11/2021
SOURCE: Architectural Resources Group, Inc., October 2021.

DATE

PROJECT NUMBER

DESIGNED BY

DRAWN BY

CHECKED BY
1700925
KE
DM
SW

SHEET NUMBER (EXHIBIT NUMBER)

CENTRAL PARK

APARTMENTS
86 S. FAIR OAKS AVENUE
PASADENA, CA 91105

DRAWING TITLE

PROJECT DESCRIPTION

TURN ANALYSIS

DATE ISSUED FOR
STAMP
EXH-01
700 South Flower Street, Suite 2100
Los Angeles, CA 90017
O: 213.418.0201
F: 213.266.5294
www.kpff.com
- The project will
accommodate loading and
deliveries, for residential and
commercial uses, via the
Dayton Avenue drive.
- A loading space is located
on the left side of the drive
aisle, adjacent to the parking
garage entrance ramp (12'
wide x 30' long x 14' tall).
- Ample room is provided
for trucks to reverse within
the site to enter and exit with
the cab facing Dayton in
order to avoid disruptions to
traffic.

DAYTON AVE. DAYTON AVE.

LOADING: INBOUND. LOADING: OUTBOUND
Turn Analysis
FIGURE 7.13-4
1136.004•11/2021
SOURCE: Architectural Resources Group, Inc., October 2021.

APPENDIX A
Incorporation of Applicable Mitigation Measures, Performance Standards, and Criteria from Prior Applicable EIRs
Impact Sciences, Inc. A-1 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020

APPENDIX A

INCORPORATION OF FEASIBLE MITIGATION MEASURES,

PERFORMANCE STANDARDS, AND CRITERIA

FROM PRIOR APPLICABLE EIRS
Public Resources Code Section 21151.2 requires that a transit priority project incorporate all feasible mitigation measures, performance standards, or criteria from prior applicable EIRs. The City has complied with PRC Section 21151.2 by reviewing all of the suggested mitigation measures in Connect SoCal (2020 – 2045 Regional Transportation Plan/Sustainable Communities Strategy) and the City of Pasadena General Plan EIR for imposition on the project. The mitigation measures were not imposed if the project was found to be in substantial compliance with the mitigation measure as proposed or if the mitigation measures were found not to be relevant. If the project was not found to be in substantial compliance or the mitigation measure was found relevant, the City considered whether to use the mitigation measure or an equally effective City mitigation measure (including the mitigation measures developed for the SCEA prepared for the proposed project). The applicable mitigation measures, performance standards, or criteria from the aforementioned documents are discussed in the tables below and are included in applicable technical sections of the Environmental Checklist portion of the SCEA.

Table 1
Connect SoCal (2020 – 2045 Regional Transportation Plan/Sustainable Communities Strategy) Applicable Mitigation Measures
Project Level Mitigation Measure Applicability to the Project Aesthetics
PMM AES-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to address potential aesthetic impacts to scenic vistas, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) Use a palette of colors, textures, building materials that are graffiti-resistant, and/or plant materials that complement the surrounding landscape and
development.
b) Use contour grading to better match surrounding
terrain. Contour edges of major cut-and-fill to
provide a more natural looking finished profile.
c) Design new corridor landscaping to respect existing
natural and man-made features and to complement
the dominant landscaping of the surrounding areas.
d) Replace and renew landscaping along corridors with
road widenings, interchange projects, and related
improvements.
e) Retain or replace trees bordering highways, so that
This Mitigation Measure is not relevant to the Proposed Project as Public Resources Code Section 21099, enacted by Senate Bill 743, provides that “aesthetic and parking impacts of a residential, mixed-use residential, or employment center project on an infill site within a transit priority area shall not be considered significant impacts on the environment.”
The project site is located in an urbanized area within the City of Pasadena. The proposed project is a 6-story plus
mezzanine transit-oriented mixed-use development that
includes retail, restaurants, and work/live units at the ground level and mixed-rate apartment units on levels 2-6. The project site is located less than one-quarter mile from the Metro Del Mar L Line (formerly Gold Line) station and less than one-half a mile to the Memorial Park Station. Therefore, the proposed project is located in a transit priority area as defined in Public Resources Code Section 21099. The proposed project’s
aesthetic impacts shall not be considered significant impacts on the environment pursuant to Public Resources Code
Section 21099.

Further, the Proposed Project would follow the City’s
guidelines regarding building design and provide a full landscape plan for approval by the City.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-2 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project clear-cutting is not evident.
f) Provide new corridor landscaping that respects and
provides appropriate transition to existing natural and man-made features and is complementary to the
dominant landscaping or native habitats of
surrounding areas.
g) Reduce the visibility of construction staging areas by fencing and screening these areas with low contrast
materials consistent with the surrounding
environment, and by revegetating graded slopes and
exposed earth surfaces at the earliest opportunity;
h) Use see-through safety barrier designs (e.g. railings rather than walls)
PMM AES-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to address potential aesthetic impacts that substantially degrade visual character, as applicable and feasible. Such measures may include the
following or other comparable measures identified by the Lead Agency:
a) Minimize contrasts in scale and massing between the
projects and surrounding natural forms and
development, minimize their intrusion into important
viewsheds, and use contour grading to better match
surrounding terrain in accordance with county and
city hillside ordinances, where applicable.
b) Design landscaping along highway corridors to add
significant natural elements and visual interest to
soften the hard-edged, linear transportation corridors. c) Require development of design guidelines for
projects that make elements of proposed
buildings/facilities visually compatible or minimize
visibility of changes in visual quality or character
through use of hardscape and softscape solutions.

Specific measures to be addressed include setback
buffers, landscaping, color, texture, signage, and
lighting criteria.
d) Design projects consistent with design guidelines of applicable general plans.
e) Require that sites are kept in a blight/nuisance-free condition. Remove blight or nuisances that
compromise visual character or visual quality of
project areas including graffiti abatement, trash
removal, landscape management, maintenance of
signage and billboards in good condition, and replace
compromised native vegetation and landscape.
f) Where sound walls are proposed, require sound wall
construction and design methods that account for
visual impacts as follows:
 use transparent panels to preserve views
where sound walls would block views from
residences;
 use landscaped earth berm or a
combination wall and berm to minimize
the apparent sound wall height;
 construct sound walls of materials whose
color and texture complements the
surrounding landscape and development;
This Mitigation Measure is not relevant to the proposed project as Public Resources Code Section 21099, enacted by Senate Bill 743, provides that “aesthetic and parking impacts of a residential, mixed-use residential, or employment center project on an infill site within a transit priority area shall not be considered significant impacts on the environment.”
The project site is located in an urbanized area within the City of Pasadena. The proposed project is a 6-story plus
mezzanine transit-oriented mixed-use development that
includes retail, restaurants, and work/live units at the ground level and mixed-rate apartment units on levels 2-6. The project site is located less than one-quarter mile from the Metro Del Mar L Line (formerly Gold Line) station and less than one-half a mile to the Memorial Park Station. Therefore, the proposed project is located in a transit priority area as defined in Public Resources Code Section 21099. The proposed project’s
aesthetic impacts shall not be considered significant impacts on the environment pursuant to Public Resources Code
Section 21099.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-3 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project g) Design sound walls to increase visual interest,
reduce apparent height, and be visually compatible
with the surrounding area; and landscape the sound
walls with plants that screen the sound wall,
preferably with either native vegetation or
landscaping that complements the dominant
landscaping of surrounding areas.

PMM AES-3: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to address potential aesthetic impacts that substantially degrade visual character, as applicable and feasible. Such measures may include the
following or other comparable measures identified by the Lead Agency:
a) Use lighting fixtures that are adequately shielded to a point below the light bulb and reflector and that
prevent unnecessary glare onto adjacent properties.
b) Restrict the operation of outdoor lighting for
construction and operation activities to the hours of
7:00 a.m. to 10:00 p.m. or as otherwise required by
applicable local rules or ordinances.
c) Use high pressure sodium and/or cut-off fixtures
instead of typical mercury-vapor fixtures for outdoor
lighting.
d) Use unidirectional lighting to avoid light trespass onto adjacent properties.
e) Design exterior lighting to confine illumination to the project site, and/or to areas which do not include lightsensitive uses. f) Provide structural and/or vegetative screening from
light-sensitive uses.
g) Shield and direct all new street and pedestrian
lighting away from light-sensitive off-site uses.
h) Use non-reflective glass or glass treated with a nonreflective coating for all exterior windows and glass used on building surfaces.
i) Architectural lighting shall be directed onto the
building surfaces and have low reflectivity to
minimize glare and limit light onto adjacent
properties.

This Mitigation Measure is not relevant to the Proposed Project as Public Resources Code Section 21099, enacted by Senate Bill 743, provides that “aesthetic and parking impacts of a residential, mixed-use residential, or employment center project on an infill site within a transit priority area shall not be considered significant impacts on the environment.”
The project site is located in an urbanized area within the City of Pasadena. The proposed project is a 6-story plus
mezzanine transit-oriented mixed-use development that
includes retail, restaurants, and work/live units at the ground level and mixed-rate apartment units on levels 2-6. The project site is located less than one-quarter mile from the Metro Del Mar L Line (formerly Gold Line) station and less than one-half a mile to the Memorial Park Station. Therefore, the proposed project is located in a transit priority area as defined in Public Resources Code Section 21099. The proposed project’s
aesthetic impacts shall not be considered significant impacts on the environment pursuant to Public Resources Code
Section 21099.

Agriculture and Forestry
PMM AG-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to address potential adverse effects on agricultural resources, as applicable and feasible.

Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Require project sponsors to mitigate for loss of
farmland by providing permanent protection of in-kind
farmland in the form of easements, fees, or
elimination of development rights/potential.
b) Project relocation or corridor realignment to avoid
Prime Farmland, Unique Farmland, or Farmland of
Local or Statewide Importance.
c) Maintain and expand agricultural land protections
such as urban growth boundaries.

This Mitigation Measure is not relevant to the proposed project as no farmland or agricultural activity exists on or in the vicinity of the project site. See Section 2, Agricultural Resources, of the SCEA for further information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-4 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project d) Provide for mitigation fees to support a mitigation
bank1that invests in farmer education, agricultural
infrastructure, water supply, marketing, etc. that
enhance the commercial viability of retained
agricultural lands.
e) Minimize severance and fragmentation of agricultural land by constructing underpasses and overpasses at
reasonable intervals to provide property access.
f) Use berms, buffer zones, setbacks, and fencing to
reduce conflicts between new development and
farming uses and protect the functions of farmland.

PMM AG-2: Project level mitigation measures can and should be considered by Lead Agencies as applicable and feasible.

Measures to reduce substantial adverse effects on Williamson Act contracts to the maximum extent practicable, as
determined appropriate by each Lead Agency, may include the following, or other comparable measures:
a) Project relocation or corridor realignment to avoid
lands in Williamson Act contracts.
b) Establish conservation easements consistent with
the recommendations of the Department of
Conservation, or 20-year Farmland Security Zone
contracts (Government Code Section 51296 et
seq.), 10-year Williamson Act contracts
(Government Code Section 51200 et seq.), or use of
other conservation tools available from the California
Department of Conservation Division of Land
Resource Protection.

This Mitigation Measure is not relevant to the proposed project as the project Site is not zoned for agricultural production, there is no farmland at the project site, and there are no Williamson Act Contracts in effect for the project site. See Section 2, Agricultural Resources, of the SCEA for further information.

PMM AG-3: Project level mitigation measures can and should be considered by Lead Agencies as applicable and feasible.

Measures to reduce substantial adverse effects, through the conversion of Farmland to maximum extent practicable, as determined appropriate by each Lead Agency, may include the following, or other comparable measures:
a) Minimize construction related impacts to agricultural and forestry resources by locating materials and
stationary equipment in such a way as to prevent
conflict with agriculture and forestry resources.

This Mitigation Measure is not relevant to the proposed project as the project Site is not zoned for agricultural production and there is no farmland at the project site. See Section 2, Agricultural Resources, of the SCEA for further information.

PMM AG-4: Project level mitigation measures can and should be considered by Lead Agencies as applicable and feasible.

Measures to reduce substantial adverse effects, through the conversion of Farmland, to the maximum extent practicable, as determined appropriate by each Lead Agency, may include the following, or other comparable measures:
a) Design proposed projects to minimize, to the greatest extent feasible, the loss of the highest valued
agricultural land.
b) Redesign project features to minimize fragmenting or isolating Farmland. Where a project involves
acquiring land or easements, ensure that the
remaining non-project area is of a size sufficient to
allow economically viable farming operations. The
project proponents shall be responsible for acquiring
easements, making lot line adjustments, and merging
affected land parcels into units suitable for continued commercial agricultural management.

This Mitigation Measure is not relevant to the proposed project as the project Site is not zoned for agricultural production and there is no farmland at the project site. See Section 2, Agricultural Resources, of the SCEA for further information. 1 The California Department of Fish and Wildlife provides a definition for conservation or mitigation banks on their website (please see https://www.wildlife.ca.gov/Conservation/Planning/Banking).

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-5 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project c) Reconnect utilities or infrastructure that serve
agricultural uses if these are disturbed by project
construction. If a project temporarily or permanently
cuts off roadway access or removes utility lines,
irrigation features, or other infrastructure, the project proponents shall be responsible for restoring access
as necessary to ensure that economically viable
farming operations are not interrupted.

PMM AG-5: Project level mitigation measures can and should be considered by Lead Agencies as applicable and feasible.

Measures to reduce substantial adverse effects, through the conversion of Farmland, to the maximum extent practicable, as determined appropriate by each Lead Agency, may include the following, or other comparable measures:
a) Manage project operations to minimize the
introduction of invasive species or weeds that may
affect agricultural production on adjacent agricultural land. Where a project has the potential to introduce
sensitive species or habitats or have other spill-over
effects on nearby agricultural lands, the project
proponents shall be responsible for acquiring
easements on nearby agricultural land and/or
financially compensating for indirect effects on
nearby agricultural land. Easements (e.g., flowage
easements) shall be required for temporary or
intermittent interruption in farming activities (e.g.,
because of seasonal flooding or groundwater
seepage). Acquisition or compensation would be
required for permanent or significant loss of
economically viable operations.

This Mitigation Measure is not relevant to the proposed project as the project Site is not zoned for agricultural production and there is no farmland at the project site. See Section 2, Agricultural Resources, of the SCEA for further information.

Air Quality
PMM AQ-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to violating air quality standards. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) Minimize land disturbance.
b) Suspend grading and earth moving when wind gusts
exceed 25 miles per hour unless the soil is wet
enough to prevent dust plumes.
c) Cover trucks when hauling dirt.
d) Stabilize the surface of dirt piles if not removed
immediately.
e) Limit vehicular paths on unpaved surfaces and
stabilize any temporary roads.
f) Minimize unnecessary vehicular and machinery
activities.
g) Sweep paved streets at least once per day where
there is evidence of dirt that has been carried on to
the roadway.
h) Revegetate disturbed land, including vehicular paths created during construction to avoid future off-road
vehicular activities.
i) On Caltrans projects, Caltrans Standard
Specifications 10-Dust Control, 17-Watering, and 18-
Dust Palliative shall be incorporated into project
The proposed project is subject to the South Coast Air Quality Management District (SCAQMD) rules and mentioned in
Section 3, Air Quality of the SCEA. Upon compliance, the project would satisfy the applicable requirements of this mitigation measure.

The projects impacts to Air Quality were analyzed in Section 3, Air Quality, of the SCEA analysis and were found to be less than significant and the project would not require any
mitigation measures for this impact.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-6 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project specifications.
j) Require contractors to assemble a comprehensive
inventory list (i.e., make, model, engine year,
horsepower, emission rates) of all heavy-duty offroad (portable and mobile) equipment (50 horsepower and greater) that could be used an
aggregate of 40 or more hours for the construction
project. Prepare a plan for approval by the applicable
air district demonstrating achievement of the
applicable percent reduction for a CARB-approved
fleet.
k) Ensure that all construction equipment is properly
tuned and maintained.
l) Minimize idling time to 5 minutes—saves fuel and
reduces emissions.
m) Provide an operational water truck on-site at all times.

Use watering trucks to minimize dust; watering should
be sufficient to confine dust plumes to the project
work areas. Sweep paved streets at least once per
day where there is evidence of dirt that has been
carried on to the roadway.
n) Utilize existing power sources (e.g., power poles) or clean fuel generators rather than temporary power
generators.
o) Develop a traffic plan to minimize community impacts as a result of traffic flow interference from
construction activities. The plan may include advance
public notice of routing, use of public transportation, and satellite parking areas with a shuttle service.

Schedule operations affecting traffic for off-peak
hours. Minimize obstruction of through-traffic lanes.

Provide a flag person to guide traffic properly and
ensure safety at construction sites. Project sponsors
should consider developing a goal for the
minimization of community impacts.
p) As appropriate require that portable engines and
portable engine-driven equipment units used at the
project work site, with the exception of on-road and
off-road motor vehicles, obtain CARB Portable
Equipment Registration with the state or a local
district permit. Arrange appropriate consultations with the CARB or the District to determine registration and
permitting requirements prior to equipment operation
at the site.
q) Require projects to use Tier 4 Final equipment or
better for all engines above 50 horsepower (hp). In
the event that construction equipment cannot meet to
Tier 4 Final engine certification, the Project
representative or contractor must demonstrate
through future study with written findings supported
by substantial evidence that is approved by SCAG
before using other technologies/strategies.

Alternative applicable strategies may include, but
would not be limited to, construction equipment with
Tier 4 Interim or reduction in the number and/or
horsepower rating of construction equipment and/or
limiting the number of construction equipment
operating at the same time. All equipment must be
tuned and maintained in compliance with the
manufacturer’s recommended maintenance schedule
and specifications. All maintenance records for each
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-7 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project equipment and their contractor(s) should make
available for inspection and remain on-site for a
period of at least two years from completion of
construction, unless the individual project can
demonstrate that Tier 4 engines would not be
required to mitigate emissions below significance
thresholds. Project sponsors should also consider
including ZE/ZNE technologies where appropriate
and feasible.
r) Projects located within the South Coast Air Basin
should consider applying for South Coast AQMD
“SOON” funds which provides funds to applicable
fleets for the purchase of commercially available lowemission heavy-duty engines to achieve near-term reduction of NOx emissions from in-use off-road
diesel vehicles.
s) Projects located within AB 617 communities should
review the applicable Community Emissions
Reduction Plan (CERP) for additional mitigation that
can be applied to individual projects.
t) Where applicable, projects should provide
information about air quality related programs to
schools, including the Environmental Justice
Community Partnerships (EJCP), Clean Air Ranger
Education (CARE), and Why Air Quality Matters
programs.
u) Projects should work with local cities and counties to install adequate signage that prohibits truck idling in certain locations (e.g., near schools and sensitive
receptors).
v) As applicable for airport projects, the following
measures should be considered:
a. Considering operational improvements to
reduce taxi time and auxiliary power unit
usage, where feasible. Additionally,
consider single engine taxing, if feasible
as allowed per Federal Aviation
Administration guidelines.
b. Set goals to achieve a reduction in
emissions from aircraft operations over
the lifetime of the proposed project.
c. Require the use of ground service
equipment (GSE) that can operate on
battery-power. If electric equipment
cannot be obtained, require the use of
alternative fuel, the cleanest gasoline
equipment, or Tier 4, at a minimum.
w) As applicable for port projects, the following
measures should be considered:
a. Develop specific timelines for transitioning
to zero emission cargo handling
equipment (CHE).
b. Develop interim performance standards
with a minimum amount of CHE
replacement each year to ensure
adequate progress.
c. Use short side electric power for ships,
which may include tugboats and other
ocean-going vessels or develop incentives
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-8 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project to gradually ramp up the usage of shore
power.
d. Install the appropriate infrastructure to
provide shore power to operate the ships.

Electrical hookups should be appropriately
sized.
e. Maximize participation in the Port of Los
Angeles’ Vessel Speed Reduction
Program or the Port of Long Beach’s
Green Flag Initiation Program in order to
reduce the speed of vessel transiting
within 40 nautical miles of Point Fermin.
f. Encourage the participation in the Green
Ship Incentives.
g. Offer incentives to encourage the use of
on-dock rail.
x) As applicable for rail projects, the following
measures should be considered:
a. Provide the highest incentives for electric
locomotives and then locomotives that
meet Tier 5 emission standards with a
floor on the incentives for locomotives that
meet Tier 4 emission standards.
y) Projects that will introduce sensitive receptors within 500 feet of freeways and other sources should
consider installing high efficiency of enhanced
filtration units, such as Minimum Efficiency
Reporting Value (MERV) 13 or better. Installation of
enhanced filtration units can be verified during
occupancy inspection prior to the issuance of an
occupancy permit.
z) Develop an ongoing monitoring, inspection, and
maintenance program for the MERV filters.
a. Disclose potential health impacts to
prospective sensitive receptors from living
in close proximity to freeways or other
sources of air pollution and the reduced
effectiveness of air filtration systems when
windows are open or residents are
outside.
b. Identify the responsible implementing and
enforcement agency to ensure that
enhanced filtration units are installed onsite before a permit of occupancy is issued.
c. Disclose the potential increase in energy
costs for running the HVAC system to
prospective residents.
d. Provide information to residents on where
MERV filters can be purchased.
e. Provide recommended schedule (e.g.,
every year or every six months) for
replacing the enhanced filtration units.
f. Identify the responsible entity such as
future residents themselves,
Homeowner’s Association, or property
managers for ensuring enhanced filtration
units are replaced on time.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-9 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project g. Identify, provide, and disclose ongoing
cost-sharing strategies, if any, for
replacing the enhanced filtration units.
h. Set criteria for assessing progress in
installing and replacing the enhanced
filtration units; and
i. Develop a process for evaluating the
effectiveness of the enhanced filtration
units.
aa) Consult the SCAG Environmental Justice Toolbox
for potential measures to address impacts to lowincome and/or minority communities.

Biological Resources
PMM BIO-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to threatened and endangered species, as applicable and feasible. Such measures may include the
following or other comparable measures identified by the Lead Agency:
a) Require project design to avoid occupied habitat,
potentially suitable habitat, and designated critical
habitat, wherever practicable and feasible.
b) Where avoidance is determined to be infeasible,
provide conservation measures to fulfill the
requirements of the applicable authorization for
incidental take pursuant to Section 7 or 10(a) of the
federal ESA, Section 2081 of the California ESA to
support issuance of an incidental take permit, and/or
as identified in local or regional plans. Conservation
strategies to protect the survival and recovery of
federally and state-listed endangered and local
special status species may include:
i. Impact minimization strategies
ii. Contribution of in-lieu fees for in-kind
conservation and mitigation efforts
iii. Use of in-kind mitigation bank credits
iv. Funding of research and recovery efforts
v. Habitat restoration
vi. Establishment of conservation easements
vii. Permanent dedication of in-kind habitat
c) Design projects to avoid desert native plants
protected under the California Desert Native Plants
Act, salvage and relocate desert native plants,
and/or pay in lieu fees to support off-site long-term
conservation strategies.
d) Temporary access roads and staging areas will not
be located within areas containing sensitive plants,
wildlife species or native habitat wherever feasible,
so as to avoid or minimize impacts to these species.
e) Develop and implement a Worker Environmental
Awareness Program (environmental education) to
inform project workers of their responsibilities to
avoid and minimize impacts on sensitive biological
resources.

This Mitigation Measure is not relevant to the proposed project as the project site does not contain any critical habitat or support any species identified or designated as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service. The project site is located in an urbanized area of the City and is not identified as a vegetation zone that could serve as species’ habitat. No mitigation is required for this impact.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-10 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project f) Retain a qualified botanist to document the presence or absence of special status plants before project
implementation.
g) Appoint a qualified biologist to monitor construction activities that may occur in or adjacent to occupied
sensitive species’ habitat to facilitate avoidance of
resources not permitted for impact.
h) Appoint a qualified biologist to monitor
implementation of mitigation measures.
i) Schedule construction activities to avoid sensitive
times for biological resources (e.g. steelhead
spawning periods during the winter and spring,
nesting bird season) and to avoid the rainy season
when erosion and sediment transport is increased.
j) Develop an invasive species control plan associated
with project construction.
k) If construction occurs during breeding seasons in or adjacent to suitable habitat, include appropriate
sound attenuation measures required for sensitive
avian species and other best management practices
appropriate for potential local sensitive wildlife.
l) Conduct pre-construction surveys to delineate
occupied sensitive species’ habitat to facilitate
avoidance.
m) Where projects are determined to be within suitable
habitat and may impact listed or sensitive species
that have specific field survey protocols or guidelines outlined by the USFWS, CDFW, or other local
agency, conduct preconstruction surveys that follow
applicable protocols and guidelines and are
conducted by qualified and/or certified personnel.

PMM BIO-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to riparian habitats and other sensitive natural communities, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Consult with the USFWS and NMFS where such
state-designated sensitive or riparian habitats provide potential or occupied habitat for federally listed rare, threatened, and endangered species afforded
protection pursuant to the federal ESA.
b) Consult with the USFS where such state-designated
sensitive or riparian habitats provide potential or
occupied habitat for federally listed rare, threatened, and endangered species afforded protection
pursuant to the federal ESA and any additional
species afforded protection by an adopted Forest
Land Management Plan or Resource Management
Plan for the four national forests in the six-county
area: Angeles, Cleveland, Los Padres, and San
Bernardino.
c) Consult with the CDFW where such state-designated
sensitive or riparian habitats provide potential or
occupied habitat for state-listed rare, threatened, and endangered species afforded protection pursuant to
the California ESA, or Fully Protected Species
afforded protection pursuant to the State Fish and
This Mitigation Measure is not relevant to the proposed project as the project site does not contain any state-designated sensitive habitats, including riparian habitats that are in the jurisdiction and responsibility of U.S. Fish and Wildlife Service, the National Marine Fisheries Service, the California
Department of Fish and Wildlife; and other public agencies, and/or Lead Agencies. See Section 4, Biological Resources, of the SCEA for more information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-11 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project Game Code.
d) Consult with the CDFW pursuant to the provisions of
Section 1600 of the State Fish and Game Code as
they relate to Lakes and Streambeds.
e) Consult with the USFWS, USFS, CDFW, and
counties and cities in the SCAG region, where statedesignated sensitive or riparian habitats are occupied by birds afforded protection pursuant to the MBTA
during the breeding season.
f) Consult with the CDFW for state-designated sensitive or riparian habitats where furbearing mammals,
afforded protection pursuant to the provisions of the
State Fish and Game Code for fur-beaming
mammals, are actively using the areas in conjunction
with breeding activities.
g) Require project design to avoid sensitive natural
communities and riparian habitats, wherever
practicable and feasible.
h) Where avoidance is determined to be infeasible,
develop sufficient conservation measures through
coordination with local agencies and the regulatory
agency (i.e., USFWS or CDFW) to protect sensitive
natural communities and riparian habitats and
develop appropriate compensatory mitigation, where
required.
i) Appoint a qualified wetland biologist to monitor
construction activities that may occur in or adjacent to sensitive communities.
j) Appoint a qualified wetland biologist to monitor
implementation of mitigation measures.
k) Schedule construction activities to avoid sensitive
times for biological resources and to avoid the rainy
season when erosion and sediment transport is
increased.
l) When construction activities require stream
crossings, schedule work during dry conditions and
use rubber-wheeled vehicles, when feasible. Have a
qualified wetland scientist determine if potential
project impacts require a Notification of Lake or
Streambed Alteration to CDFW during the planning
phase of projects.
m) Consult with local agencies, jurisdictions, and
landowners where such state-designated sensitive or
riparian habitats are afforded protection pursuant an
adopted regional conservation plan.
n) Install fencing and/or mark sensitive habitat to be
avoided during construction activities.
o) Salvage and stockpile topsoil (the surface material
from 6 to 12 inches deep) and perennial native plants,
when recommended by the qualified wetland
biologist, for use in restoring native vegetation to
areas of temporary disturbance within the project
area. Salvage of soils containing invasive species,
seeds and/or rhizomes will be avoided as identified
by the qualified wetland biologist.
p) Revegetate with appropriate native vegetation
following the completion of construction activities, as identified by the qualified wetland biologist.
q) Complete habitat enhancement (e.g., through
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-12 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project removal of non-native invasive wetland species and
replacement with more ecologically valuable native
species).
r) Use Best Management Practices (BMPs) at
construction sites to minimize erosion and sediment
transport from the area. BMPs include encouraging
growth of native vegetation in disturbed areas, using
straw bales or other silt-catching devices, and using
settling basins to minimize soil transport.

PMM BIO-3: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to wetlands, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency.
a) Require project design to avoid federally protected
aquatic resources consistent with the provisions of
Sections 404 and 401 of the CWA, wherever
practicable and feasible.
b) Where the lead agency has identified that a project, or other regionally significant project, has the
potential to impact other wetlands or waters, such as
those considered Waters Of the State of California
under the State Wetland Definition and Procedures
for Dischargers of Dredged or Fill Material to Waters
of the State, not protected under Section 404 or 401
of the CWA, seek comparable coverage for these
wetlands and waters in consultation with the SWRCB,
applicable RWQCB, and CDFW.
c) Where avoidance is determined to be infeasible,
develop sufficient conservation measures to fulfill
the requirements of the applicable authorization for
impacts to federal and state protected aquatic
resource to support issuance of a permit under
Section 404 of the CWA as administered by the
USACE. The use of an authorized Nationwide
Permit or issuance of an individual permit requires
the project applicant to demonstrate compliance with
the USACE’s Final Compensatory Mitigation Rule.

The USACE reviews projects to ensure
environmental impacts to aquatic resources are
avoided or minimized as much as possible.

Consistent with the administration’s performance
standard of “no net loss of wetlands” a USACE
permit may require a project proponent to restore,
establish, enhance or preserve other aquatic
resources in order to replace those affected by the
proposed project. This compensatory mitigation
process seeks to replace the loss of existing aquatic
resource functions and area. Project proponents
required to complete mitigation are encouraged to
use a watershed approach and watershed planning
information. The new rule establishes performance
standards, sets timeframes for decision making, and
to the extent possible, establishes equivalent
requirements and standards for the three sources of
compensatory mitigation:
 Permittee-responsible mitigation
 Contribution of in-kind in-lieu fees
This Mitigation Measure is not relevant to the proposed project as the project site does not contain any state or federally protected wetlands. See Section 4, Biological Resources, of the SCEA for more information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-13 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project  Use of in-kind mitigation bank credits
d) Where avoidance is determined to be infeasible and
proposed projects’ impacts exceed an existing
Nationwide Permit (NWP) and/or California SWRCBcertified NWP, or applicable County Special Area Management Plan (SAMP), the lead agency should
provide USACE and SWRCB (where applicable) an
alternative analysis consistent with the Least
Environmentally Damaging Practicable Alternatives
in this order of priorities:
 Avoidance
 Impact Minimization
 On-site alternatives
 Off-site alternatives
e) Require review of construction drawings by a
certified wetland delineator as part of each projectspecific environmental analysis to determine whether aquatic resources will be affected and, if
necessary, perform formal wetland delineation.

PMM BIO-4: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to wildlife movement, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Consult with the USFS where impacts to migratory
wildlife corridors may occur in an area afforded
protection by an adopted Forest Land Management
Plan or Resource Management Plan for the four
national forests in the six-County area: Angeles,
Cleveland, Los Padres, and San Bernardino.
b) Consult with counties, cities, and other local
organizations when impacts may occur to open space
areas that have been designated as important for
wildlife movement related to local ordinances or
conservation plans.
c) Prohibit construction activities within 500 feet of
occupied breeding areas for wildlife afforded
protection pursuant to Title 14 § 460 of the California Code of Regulations protecting fur-bearing
mammals, during the breeding season.
d) Conduct a survey to identify active raptor and other migratory nongame bird nests by a qualified biologist
at least two weeks before the start of construction at
project sites from February 1 through August 31.
e) Prohibit construction activities with 300 feet of
occupied nest of birds afforded protection pursuant to
the Migratory Bird Treaty Act, during the breeding
season.
f) Ensure that suitable nesting sites for migratory
nongame native bird species protected under the
Migratory Bird Treaty Act and/or trees with
unoccupied raptor nests should only be removed prior
to February 1, or following the nesting season.
g) When feasible and practicable, proposed projects will be designed to minimize impacts to wildlife movement
and habitat connectivity and preserve existing and
This Mitigation Measure is not applicable to the proposed project as the project is located in a developed urban area and does not involve the dispersal of wildlife nor would the project result in a barrier to migration or movement. The project would also comply with the Migratory Bird Treaty Act which governs the taking, killing, possession, transportation, and importation of migratory birds, their eggs, parts, and nests.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-14 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project functional wildlife corridors.
h) Conduct site-specific analyses of opportunities to
preserve or improve habitat linkages with areas onand off-site. i) Long linear projects with the possibility of impacting wildlife movement should analyze habitat
linkages/wildlife movement corridors on a broad scale
to avoid critical narrow choke points that could reduce function of recognized movement corridor.
j) Require review of construction drawings and habitat
connectivity mapping by a qualified biologist to
determine the risk of habitat fragmentation.
k) Pursue mitigation banking to preserve habitat
linkages and corridors (opportunities to purchase,
maintain, and/or restore offsite habitat).
l) When practicable and feasible design projects to
promote wildlife corridor redundancy by including
multiple connections between habitat patches.
m) Evaluate the potential for installation of overpasses, underpasses, and culverts to create wildlife crossings
in cases where a roadway or other transportation
project may interrupt the flow of species through their habitat. Retrofitting of existing infrastructure in project areas should also be considered for wildlife crossings
for purposes of mitigation.
n) Install wildlife fencing where appropriate to minimize the probability of wildlife injury due to direct
interaction between wildlife and roads or
construction.
o) Where avoidance is determined to be infeasible,
design sufficient conservation measures through
coordination with local agencies and the regulatory
agency (i.e., USFWS or CDFW) and in accordance
with the respective counties and cities general plans
to establish plans to mitigate for the loss of fish and wildlife movement corridors and/or wildlife nursery
sites. The consideration of conservation measures
may include the following measures, in addition to
the measures outlined in MM-BIO-1(b), where
applicable:
 Wildlife movement buffer zones
 Corridor realignment
 Appropriately spaced breaks in center
barriers
 Stream rerouting
 Culverts
 Creation of artificial movement corridors
such as freeway under- or overpasses
 Other comparable measures
p) Where the lead agency has identified that a
RTP/SCS project, or other regionally significant
project, has the potential to impact other open space
or nursery site areas, seek comparable coverage for
these areas in consultation with the USFWS, CDFW,
NMFS, or other local jurisdictions.
q) Incorporate applicable and appropriate guidance
(e.g. FHWA-HEP-16-059), as well as best
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-15 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project management practices, to benefit pollinators with a
focus on native plants.

PMM BIO-5: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce conflicts with local policies and ordinances protecting biological resources, as applicable and feasible. Such measures may include the
following or other comparable measures identified by the Lead Agency:
a) Consult with the appropriate local agency responsible for the administration of the policy or ordinance
protecting biological resources.
b) Prioritize retention of trees on-site consistent with local regulations. Provide adequate protection during
the construction period for any trees that are to
remain standing, as recommended by an
International Society of Arboriculture (ISA) certified
arborist.
c) If specific project area trees are designated as
“Protected Trees,” “Landmark Trees,” or “Heritage
Trees,” obtain approval for encroachment or
removals through the appropriate entity, and develop
appropriate mitigation measures at that time, to
ensure that the trees are replaced. Mitigation trees
shall be locally collected native species, as directed
by a qualified biologist.
d) Appoint an ISA certified arborist to monitor
construction activities that may occur in areas with
trees are designated as “Protected Trees,”
“Landmark Trees,” or “Heritage Trees,” to facilitate
avoidance of resources not permitted for impact.

Before the start of any clearing, excavation,
construction or other work on the site, securely fence
off every protected tree deemed to be potentially
endangered by said site work. Keep such fences in
place for duration of all such work. Clearly mark all
trees to be removed.
e) Establish a scheme for the removal and disposal of
logs, brush, earth and other debris that will avoid
injury to any protected tree. Where proposed
development or other site work could encroach upon
the protected perimeter of any protected tree,
incorporate special measures to allow the roots to
breathe and obtain water and nutrients. Minimize any
excavation, cutting, filing, or compaction of the
existing ground surface within the protected
perimeter. Require that no change in existing ground
level occur from the base of any protected tree at any
time. Require that no burning or use of equipment
with an open flame occur near or within the protected
perimeter of any protected tree.
f) Require that no storage or dumping of oil, gas,
chemicals, or other substances that may be harmful
to trees occur from the base of any protected trees,
or any other location on the site from which such
substances might enter the protected perimeter.

Require that no heavy construction equipment or
construction materials be operated or stored within a
distance from the base of any protected trees.

Require that wires, ropes, or other devices not be
The proposed project would be subject to the provisions of PMC Chapter 8.52, the City Trees and Tree Protection
Ordinance and by complying therewith, would be in
compliance with this Mitigation Measure. Construction
activities would also be subject to the provisions of PMC Chapter 8.52, the City Trees and Tree Protection Ordinance.

Compliance with these provisions would ensure that there would be no potentially significant impacts to on-site biological resources.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-16 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project attached to any protected tree, except as needed for
support of the tree. Require that no sign, other than a tag showing the botanical classification, be attached
to any protected tree.
g) Thoroughly spray the leaves of protected trees with
water periodically during construction to prevent
buildup of dust and other pollution that would inhibit
leaf transpiration, as directed by the certified arborist. h) If any damage to a protected tree should occur during or as a result of work on the site, the appropriate local agency will be immediately notified of such damage.

If, such tree cannot be preserved in a healthy state,
as determined by the certified arborist, require
replacement of any tree removed with another tree or
trees on the same site deemed adequate by the local
agency to compensate for the loss of the tree that is
removed. Remove all debris created as a result of any
tree removal work from the property within two weeks
of debris creation, and such debris shall be properly
disposed of in accordance with all applicable laws,
ordinances, and regulations. Design projects to avoid
conflicts with local policies and ordinances protecting biological resources
i) Where avoidance is determined to be infeasible,
sufficient conservation measures to fulfill the
requirements of the applicable policy or ordinance
shall be developed, such as to support issuance of a
tree removal permit. The consideration of
conservation measures may include:
 Avoidance strategies
 Contribution of in-lieu fees
 Planting of replacement trees
 Re-landscaping areas with native
vegetation post-construction
 Other comparable measures developed in
consultation with local agency and
certified arborist.

PMM BIO-6: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects on HCPs and NCCPs, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) Consult with the appropriate federal, state, and/or
local agency responsible for the administration of
HCPs or NCCPs.
b) Wherever practicable and feasible, the project shall be designed to avoid lands preserved under the
conditions of an HCP or NCCP.
c) Where avoidance is determined to be infeasible,
sufficient conservation measures to fulfill the
requirements of the HCP and/or NCCP, which would
include but not be limited to applicable authorization
for incidental take pursuant to Section 7 or 10(a) of
the federal Endangered Species Act or Section 2081
of the California ESA, shall be developed to support
issuance of an incidental take permit or any other
permissions required for development within the
This Mitigation Measure is not relevant to the proposed project as no habitat conservation plan or natural community
conservation plans encompass the site and no locally
designated natural communities occur on or adjacent to the project site. See Section 4, Biological Resources, of the SCEA for further information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-17 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project HCP/NCCP boundaries. The consideration of
additional conservation measures would include the
measures outlined in SMM-BIO-2, where applicable.

Cultural Resources
PMM CULT-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to historical resources, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Pursuant to CEQA Guidelines Section 15064.5,
conduct a record search during the project planning
phase at the appropriate Information Center to
determine whether the project area has been
previously surveyed and whether historical resources
were identified.
b) During the project planning phase, retain a qualified architectural historian, defined as an individual who
meets the Secretary of the Interior’s (SOI)
Professional Qualification Standards (PQS) in
Architectural History, to conduct historic architectural surveys if a built environment resource greater than
45 years in age may be affected by the project or if
recommended by the Information Center.
c) Comply with Section 106 of the National Historic
Preservation Act (NHPA) including, but not limited
to, projects for which federal funding or approval is
required for the individual project. This law requires
federal agencies to evaluate the impact of their
actions on resources included in or eligible for listing in the National Register. Federal agencies must
coordinate with the State Historic Preservation
Officer in evaluating impacts and developing
mitigation. These mitigation measures may include,
but are not limited to the following:
 Employ design measures to avoid
historical resources and undertake
adaptive reuse where appropriate and
feasible. If resources are to be preserved,
as feasible, carry out the maintenance,
repair, stabilization, rehabilitation,
restoration, preservation, conservation or
reconstruction in a manner consistent with
the Secretary of the Interior’s Guidelines
for Preserving, Rehabilitating, Restoring,
and Reconstructing Historic Buildings. If
resources would be impacted, impacts
should be minimized to the extent
feasible.
 Where feasible, noise buffers/walls and/or
visual buffers/landscaping should be
constructed to preserve the contextual
setting of significant built resources.
d) If a project requires the relocation, rehabilitation, or alteration of an eligible historical resource, the
Secretary of the Interior’s Standards for the
Treatment of Historic Properties should be used to
the maximum extent possible to ensure the historical
significance of the resource is not impaired. The
The proposed project would not result in a substantial adverse change in the significance of the Old Pasadena Historic District or the Hotel Green/Castle Green or the building at 84 South Fair Oaks Avenue. Impacts on historical resources are less than significant and no mitigation measures are required. See Section 5, Cultural Resources, of the SCEA for further
information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-18 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project application of the standards should be overseen by
an architectural historian or historic architect
meeting the SOI PQS. Prior to any construction
activities that may affect the historical resource, a
report, meeting industry standards, should identify
and specify the treatment of character-defining
features and construction activities and be provided
to the Lead Agency for review and approval.
e) If a project would result in the demolition or
significant alteration of a historical resource eligible for or listed in the National Register of Historic
Places (NRHP), California Register of Historical
Resources (CRHR), or local register, recordation
should take the form of Historic American Buildings
Survey (HABS), Historic American Engineering
Record (HAER), or Historic American Landscape
Survey (HALS) documentation, and should be
performed by an architectural historian or historian
who meets the SOI PQS. Recordation should meet
the SOI Standards and Guidelines for Architectural
and Engineering, which defines the products
acceptable for inclusion in the HABS/HAER/HALS
collection at the Library of Congress. The specific
scope and details of documentation should be
developed at the project level in coordination with
the Lead Agency.
f) During the project planning phase, obtain a qualified archaeologist, defined as one who meets the SOI
PQS for archaeology, to conduct a record search at
the appropriate Information Center of the California
Historical Resources Information System (CHRIS) to
determine whether the project area has been
previously surveyed and whether resources were
identified.
g) Contact the NAHC to request a Sacred Lands File
search and a list of relevant Native American
contacts who may have additional information.
h) During the project planning phase, obtain a qualified archaeologist or architectural historian (depending
on applicability) to conduct archaeological and/or
historic architectural surveys as recommended by
the qualified professional, the Lead Agency, or the
Information Center. In the event the qualified
professional or Information Center will make a
recommendation on whether a survey is warranted
based on the sensitivity of the project area for
archaeological resources. Survey shall be
conducted where the records indicate that no
previous survey has been conducted, or if survey
has not been conducted within the past 10 years. If
tribal resources are identified during tribal outreach, consultation, or the record search, a Native
American representative traditionally affiliated with
the project area, as identified by the NAHC, shall be
given the opportunity to provide a representative or
monitor to assist with archaeological surveys.
i) If potentially significant archaeological resources are identified through survey, and impacts to these
resources cannot be avoided, a Phase II Testing
and Evaluation investigation should be performed by
a qualified archaeologist prior to any constructionrelated ground-disturbing activities to determine A. Applicable Mitigation Measures
Impact Sciences, Inc. A-19 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project significance. If resources determined significant or
unique through Phase II testing, and avoidance is
not possible, appropriate resource-specific mitigation
measures should be established by the lead agency,
in consultation with consulting tribes, where
appropriate, and undertaken by qualified personnel.

These might include a Phase III data recovery
program implemented by a qualified archaeologist
and performed in accordance with the OHP’s
Archaeological Resource Management Reports
(ARMR): Recommended Contents and Format and
Guidelines for Archaeological Research Designs.

Additional options can include 1) interpretative
signage, or 2) educational outreach that helps inform
the public of the past activities that occurred in this area. Should the project require extended Phase I
testing, Phase II evaluation, or Phase III data
recovery, a Native American representative
traditionally affiliated with the project area, as
indicated by the NAHC, shall be given the
opportunity to provide a representative or monitor to
assist with the archaeological assessments. The
long-term disposition of archaeological materials
collected from a significant resource should be
determined in consultation with the affiliated tribe(s), where relevant; this could include curation with a
recognized scientific or educational repository,
transfer to the tribe, or respectful reinternment in an area designated by the tribe.
j) In cases where the project area is developed and no
natural ground surface is exposed, sensitivity for
subsurface resources should be assessed based on
review of literature, geology, site development
history, and consultation with tribal parties. If this
archaeological desktop assessment indicates that
the project is located in an area sensitive for
archaeological resources, as determined by the
Lead Agency in consultation with a qualified
archaeologist, the project should retain an
archaeological monitor and, in the case of sensitivity
for tribal resources, a tribal monitor, to observe
ground disturbing operations, including but not
limited to grading, excavation, trenching, or removal
of existing features of the subject property. The
archaeological monitor should be supervised by an
archaeologist meeting the SOI PQS
k) Conduct construction activities and excavation to
avoid cultural resources (if identified). If avoidance is not feasible, further work may be needed to
determine the importance of a resource. Retain a
qualified archaeologist, and/or as appropriate, a
qualified architectural historian who should make
recommendations regarding the work necessary to
assess significance. If the cultural resource is
determined to be significant under state or federal
guidelines, impacts to the cultural resource will need
to be mitigated.
l) Stop construction activities and excavation in the
area where cultural resources are found until a
qualified archaeologist can determine whether these
resources are significant, and tribal consultation can
be conducted, in the case of tribal resources. If the
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-20 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project archaeologist determines that the discovery is
significant, its long-term disposition should be
determined in consultation with the affiliated tribe(s); this could include curation with a recognized
scientific or educational repository, transfer to the
tribe, or respectful reinternment in an area
designated by the tribe.

PMM CULT-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to human remains, as applicable and feasible.

Such measures may include the following or other comparable measures identified by the Lead Agency:
a) In the event of discovery or recognition of any human remains during construction or excavation activities
associated with the project, in any location other than a dedicated cemetery, cease further excavation or
disturbance of the site or any nearby area reasonably
suspected to overlie adjacent human remains until
the coroner of the county in which the remains are
discovered has been informed and has determined
that no investigation of the cause of death is required. b) If any discovered remains are of Native American
origin, as determined by the county Coroner, an
experienced osteologist, or another qualified
professional:
 Contact the County Coroner to contact the
NAHC to designate a Native American
Most Likely Descendant (MLD). The MLD
should make a recommendation to the
landowner or the person responsible for
the excavation work, for means of treating
or disposing of, with appropriate dignity,
the human remains and any associated
grave goods. This may include obtaining a
qualified archaeologist or team of
archaeologists to properly excavate the
human remains. In some cases, it is
necessary for the Lead Agency, qualified
archaeologist, or developer to also reach
out to the NAHC to coordinate and ensure
notification in the event the Coroner is not
available.
 If the NAHC is unable to identify a MLD, or
the MLD fails to make a recommendation
within 48 hours after being notified by the
commission, or the landowner or his
representative rejects the
recommendation of the MLD and the
mediation by the NAHC fails to provide
measures acceptable to the landowner,
obtain a culturally affiliated Native
American monitor, and an archaeologist, if
recommended by the Native American
monitor, and rebury the Native American
human remains and any associated grave
goods, with appropriate dignity, on the
property and in a location that is not
subject to further subsurface disturbance.

There are no known human remains on the site. The project site is not part of a formal cemetery and is not known to have been used for disposal of historic or prehistoric human remains. Thus, human remains are not expected to be
encountered during construction of the proposed project. In the unlikely event that human remains are encountered during project construction, State Health and Safety Code Section 7050.5 requires the project to halt until the County Coroner has made the necessary findings as to the origin and
disposition of the remains pursuant to Public Resources Code Section 5097.98. Compliance with these regulations would ensure the proposed project would satisfy applicable
requirements of this mitigation measure.

Geology and Soils
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-21 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project PMM-GEO-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to historical resources, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Consistent with the CBC and local regulatory
agencies with oversight of development associated
with the Plan, ensure that site-specific geotechnical
investigations conducted by a qualified geotechnical
expert are conducted to ascertain soil types prior to
preparation of project designs. These investigations
can and should identify areas of potential failure and
recommend remedial geotechnical measures to
eliminate any problems.
b) Consistent with the requirements of the State Water
Resources Control Board (SWRCB) for projects over
one acre in size, obtain coverage under the General
Construction Activity Storm Water Permit (General
Construction Permit) issued by the SWRCB and
prepare a stormwater pollution prevention plan
(SWPPP) and submit the plan for review and
approval by the Regional Water Quality Control Board
(RWQCB). At a minimum, the SWPPP should include
a description of construction materials, practices, and equipment storage and maintenance; a list of
pollutants likely to contact stormwater; site-specific
erosion and sedimentation control practices; a list of
provisions to eliminate or reduce discharge of
materials to stormwater; best management practices
(BMPs); and an inspection and monitoring program.
c) Consistent with the requirements of the SWRCB and
local regulatory agencies with oversight of
development associated with the Plan, ensure that
project designs provide adequate slope drainage and
appropriate landscaping to minimize the occurrence
of slope instability and erosion. Design features
should include measures to reduce erosion caused
by storm water. Road cuts should be designed to
maximize the potential for revegetation.
d) Consistent with the CBC and local regulatory
agencies with oversight of development associated
with the Plan, ensure that, prior to preparing project
designs, new and abandoned wells are identified
within construction areas to ensure the stability of
nearby soils.

As analyzed and concluded in Section 7, Geology and Soils, of the SCEA, the project does not have the potential for
significant effects related to the exposure of people and infrastructure to the effects of earthquakes, seismic related ground-failure, liquefaction, and seismically induced
landslides. The proposed project is not located adjacent to an active fault and is not in within an area subject to risk of liquefaction, landslide, or unstable or expansive soil. Further, the proposed project already complies to this Mitigation Measure as it is subject to the building construction protocols for reducing seismic hazards as provided in the Pasadena Municipal Code. Compliance would help avoid or reduce the potentially significant effects on the potential for projects to result in the exposure of people and infrastructure to the effects of earthquakes, seismic related ground-failure, liquefaction, and seismically induced landslides, that are in the jurisdiction and responsibility of public agencies, regulatory agencies, and/or Lead Agencies. The proposed project would also comply with all seismic standards provided in the
California Building Code as approved as approved by the Department of Building and Safety.

PMM GEO-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to paleontological resources. Such measures may include the following or other comparable measures
identified by the Lead Agency:
a) Ensure compliance with the Paleontological
Resources Preservation Act, the Federal Land Policy
and Management Act, the Antiquities Act, Section
5097.5 of the Public Resources Code (PRC), adopted
county and city general plans, and other federal, state and local regulations, as applicable and feasible, by
adhering to and incorporating the performance
The proposed project is not known to contain paleontological resources. Therefore, the project is not expected to encounter a unique paleontological resource or unique geologic feature.

As such, this mitigation measure is not applicable to the project. See Section 7, Geology and Soils, of the SCEA for further information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-22 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project standards and practices from the 2010 Society for
Vertebrate Paleontology (SVP) standard procedures
for the assessment and mitigation of adverse impacts
to paleontological resources.
b) Obtain review by a qualified paleontologist (e.g. who meets the SVP standards for a Principal Investigator
or Project Paleontologist or the Bureau of Land
Management (BLM) standards for a Principal
Investigator), to determine if the project has the
potential to require ground disturbance of parent
material with potential to contain unique
paleontological or resources, or to require the
substantial alteration of a unique geologic feature.

The assessment should include museum records
searches, a review of geologic mapping and the
scientific literature, geotechnical studies (if available), and potentially a pedestrian survey, if units with
paleontological potential are present at the surface.
c) Avoid exposure or displacement of parent material
with potential to yield unique paleontological
resources.
d) Where avoidance of parent material with the
potential to yield unique paleontological resources is
not feasible:

PMM-GHG-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to greenhouse gas emissions, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Integrate green building measures consistent with
CALGreen (California Building Code Title 24), local
building codes and other applicable laws, into
project design including:
i. Use energy efficient materials in building
design, construction, rehabilitation, and
retrofit.
ii. Install energy-efficient lighting, heating,
and cooling systems (cogeneration); water
heaters; appliances; equipment; and
control systems.
iii. Reduce lighting, heating, and cooling
needs by taking advantage of light-colored
roofs, trees for shade, and sunlight.
iv. Incorporate passive environmental control
systems that account for the
characteristics of the natural environment.
v. Use high-efficiency lighting and cooking
devices.
vi. Incorporate passive solar design.
vii. Use high-reflectivity building materials and
multiple glazing.
viii. Prohibit gas-powered landscape
maintenance equipment.
ix. Install electric vehicle charging stations.
x. Reduce wood burning stoves or
fireplaces.

Impacts regarding the generation of greenhouse gas
emissions were analyzed in Section 8, Greenhouse Gas
Emissions, in the SCEA. The proposed project would be
consistent with the Pasadena Climate Action Plan by
incorporating applicable actions intended to ensure that the project contributes its fair share to the City’s cumulative GHG reduction goals. The project would have a less than significant GHG impact and therefore mitigation is not required.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-23 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project xi. Provide bike lanes accessibility and
parking at residential developments.
b) Reduce emissions resulting from projects through
implementation of project features, project design, or
other measures, such as those described in
Appendix F of the State CEQA Guidelines.
c) Include off-site measures to mitigate a project’s
emissions.
d) Measures that consider incorporation of Best
Available Control Technology (BACT) during design,
construction and operation of projects to minimize
GHG emissions, including but not limited to:
i. Use energy and fuel-efficient vehicles and
equipment;
ii. Deployment of zero- and/or near zero
emission technologies;
iii. Use lighting systems that are energy
efficient, such as LED technology;
iv. Use the minimum feasible amount of
GHG-emitting construction materials;
v. Use cement blended with the maximum
feasible amount of flash or other materials
that reduce GHG emissions from cement
production;
vi. Incorporate design measures to reduce
GHG emissions from solid waste
management through encouraging solid
waste recycling and reuse;
vii. Incorporate design measures to reduce
energy consumption and increase use of
renewable energy;
viii. Incorporate design measures to reduce
water consumption;
ix. Use lighter-colored pavement where
feasible;
x. Recycle construction debris to maximum
extent feasible;
xi. Plant shade trees in or near construction
projects where feasible; and
xii. Solicit bids that include concepts listed
above.
e) Measures that encourage transit use, carpooling,
bike-share and car-share programs, active
transportation, and parking strategies, including, but
not limited to the following:
i. Promote transit-active transportation
coordinated strategies;
ii. Increase bicycle carrying capacity on
transit and rail vehicles;
iii. Improve or increase access to transit;
iv. Increase access to common goods and
services, such as groceries, schools, and
day care;
v. Incorporate affordable housing into the
project;
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-24 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project vi. Incorporate the neighborhood electric
vehicle network;
vii. Orient the project toward transit, bicycle
and pedestrian facilities;
viii. Improve pedestrian or bicycle networks, or
transit service;
ix. Provide traffic calming measures;
x. Provide bicycle parking;
xi. Limit or eliminate park supply;
xii. Unbundle parking costs;
xiii. Provide parking cash-out programs;
xiv. Implement or provide access to commute
reduction program;
f) Incorporate bicycle and pedestrian facilities into
project designs, maintaining these facilities, and
providing amenities incentivizing their use; and
planning for and building local bicycle projects that
connect with the regional network;
g) Improving transit access to rail and bus routes by
incentives for construction of transit facilities within developments, and/or providing dedicated shuttle
service to transit stations; and
h) Adopting employer trip reduction measures to
reduce employee trips such as vanpool and carpool
programs, providing end-of-trip facilities, and
telecommuting programs including but not limited to
measures that:
i. Provide car-sharing, bike sharing, and
ride-sharing programs;
ii. Provide transit passes;
iii. Shift single occupancy vehicle trips to
carpooling or vanpooling, for example
providing ride-matching services;
iv. Provide incentives or subsidies that
increase that use of modes other than
single-occupancy vehicle;
v. Provide on-site amenities at places of
work, such as priority parking for carpools
and vanpools, secure bike parking, and
showers and locker rooms;
vi. Provide employee transportation
coordinators at employment sites;
vii. Provide a guaranteed ride home service to
users of non-auto modes.
i) Designate a percentage of parking spaces for ridesharing vehicles or high-occupancy vehicles, and provide adequate passenger loading and unloading
for those vehicles;
j) Land use siting and design measures that reduce
GHG emissions, including:
i. Developing on infill and brownfields sites;
ii. Building compact and mixed-use
developments near transit;
iii. Retaining on-site mature trees and
vegetation, and planting new canopy
trees;
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-25 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project iv. Measures that increase vehicle efficiency,
encourage use of zero and low emissions
vehicles, or reduce the carbon content of
fuels, including constructing or
encouraging construction of electric
vehicle charging stations or neighborhood
electric vehicle networks, or charging for
electric bicycles; and
v. Measures to reduce GHG emissions from
solid waste management through
encouraging solid waste recycling and
reuse.
k) Consult the SCAG Environmental Justice Toolbox
for potential measures to address impacts to lowincome and/or minority communities. The measures provided above are also intended to be applied in
low income and minority communities as applicable
and feasible.

Hazards and Hazardous Materials
PMM HAZ-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to the routine transport, use, or disposal of hazardous materials, as applicable and feasible. Such
measures may include the following or other comparable
measures identified by the Lead Agency:
a) Where the construction or operation of projects
involves the transport of hazardous material, provide
a written plan of proposed routes of travel
demonstrating use of roadways designated for the
transport of such materials.
b) Specify Project requirements for interim storage and disposal of hazardous materials during construction
and operation. Storage and disposal strategies must
be consistent with applicable federal, state, and local statutes and regulations. Specify the appropriate
procedures for interim storage and disposal of
hazardous materials, anticipated to be required in
support of operations and maintenance activities, in
conformance with applicable federal, state, and local
statutes and regulations, in the business plan for
projects as applicable and appropriate.
c) Submit a Hazardous Materials Business/Operations
Plan for review and approval by the appropriate local
agency. Once approved, keep the plan on file with
the Lead Agency (or other appropriate government
agency) and update, as applicable. The purpose of
the Hazardous Materials Business/Operations Plan
is to ensure that employees are adequately trained
to handle the materials and provides information to
the local fire protection agency should emergency
response be required. The Hazardous Materials
Business/Operations Plan should include the
following:
 The types of hazardous materials or
chemicals stored and/or used on-site,
such as petroleum fuel products,
lubricants, solvents, and cleaning fluids.

The project does not involve the use or storage of hazardous substances other than the small amounts of pesticides,
fertilizers and cleaning agents required for normal
maintenance of the structure and landscaping. The project must adhere to applicable zoning and fire regulations
regarding the use and storage of any hazardous substances.

Impacts were found to be less than significant as analyzed in Section 9, Hazards and Hazardous Materials, of the SCEA and mitigation is not required.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-26 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project  The location of such hazardous materials.
 An emergency response plan including
employee training information.
 A plan that describes the way these
materials are handled, transported and
disposed.
d) Follow manufacturer’s recommendations on use,
storage, and disposal of chemical products used in
construction.
e) Avoid overtopping construction equipment fuel gas
tanks.
f) Properly contain and remove grease and oils during
routine maintenance of construction equipment.
g) Properly dispose of discarded containers of fuels
and other chemicals.
h) Prior to shipment remove the most volatile elements, including flammable natural gas liquids, as feasible.
i) Identify and implement more stringent tank car
safety standards.
j) Improve rail transportation route analysis, and
modification of routes based on that analysis.
k) Use the best available inspection equipment and
protocols and implement positive train control.
l) Reduce train car speeds to 40 miles per hour when
passing through urbanized areas of any size.
m) Limit storage of crude oil tank cars in urbanized
areas of any size and provide appropriate security in
storage yards for all shipments.
n) Notify in advance county and city emergency
operations offices of all crude oil shipments,
including a contact number that can provide realtime information in the event of an oil train derailment or accident.
o) Report quarterly hazardous commodity flow
information, including classification and
characterization of materials being transported, to all first response agencies (49 Code Fed. Regs. 15.5)
along the mainline rail routes used by trains carrying
crude oil identified.
p) Fund training and outfitting emergency response
crews that includes the cost of backfilling personnel
while in training.
q) Undertake annual emergency responses
scenario/field based training including Emergency
Operations Center Training activations with local
emergency response agencies.

PMM HAZ-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce hazards related to the reasonably foreseeable upsets and accidents involving the release of hazardous materials, as applicable and feasible.

Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Removal of the most volatile elements, including
flammable natural gas liquids, prior to shipment;
b) More stringent tank car safety standards;
The proposed project does not involve hazardous materials.

There is no significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions.

This mitigation measure is therefore not applicable to the project.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-27 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project c) Improved rail transportation route analysis, and
modification of routes based on that analysis;
d) Utilization of the best available inspection equipment and protocols, and implementation of positive train
control;
e) Reduced train car speeds to 40 miles per hour when
passing through urbanized areas of any size;
f) Limitations on storage of hazardous materials tank
cars in urbanized areas of any size and provide
appropriate security in storage yards for all
shipments;
g) Advance notification to county and city emergency
operations offices of all crude oil and hazardous
materials shipments, including a contact number that
can provide real-time information in the event of an oil train derailment or accident;
h) Quarterly hazardous commodity flow information,
including classification and characterization of
materials being transported, to all first response
agencies (49 Code Fed. Regs. 15.5) along the
mainline rail routes used by trains carrying
hazardous materials.

PMM HAZ-3: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to the release of hazardous materials within one-quarter mile of schools, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) Where the construction and operation of projects
involves the transport of hazardous materials, avoid
transport of such materials within one-quarter mile of
schools, when school is in session, wherever
feasible.
b) Where it is not feasible to avoid transport of
hazardous materials, within one-quarter mile of
schools on local streets, provide notifications of the
anticipated schedule of transport of such materials.

The project does not involve hazardous emissions or the handling of hazardous materials, substance, or waste and is not within one-quarter mile of an existing or proposed school; the closest schools are the Waverly School and St. Andrews Elementary School, both of which are approximately one-half mile away. Therefore, the proposed project would have no hazardous material related impacts to schools. This mitigation measure is not applicable to the project.

PMM HAZ-4: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to projects that are located on a site which is included on the Cortese List, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) For any listed sites or sites that have the potential for residual hazardous materials as a result of historic
land uses, complete a Phase I Environmental Site
Assessment, including a review and consideration of
data from all known databases of contaminated sites,
during the process of planning, environmental
clearance, and construction for projects.
b) Where warranted due to the known presence of
contaminated materials, submit to the appropriate
agency responsible for hazardous materials/wastes
oversight a Phase II Environmental Site Assessment
report if warranted by a Phase I report for the project site. The reports should make recommendations for
Searches conducted using the California State Water
Resources Control Board Geotracker and the Department of Toxic Substances Control EnviroStor did not reveal any
potentially hazardous sites within 1000 feet of the project site.

The site is not known or anticipated to have been
contaminated with hazardous materials and no hazardous
material storage facilities are known to exist onsite. This mitigation measure is not applicable.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-28 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project remedial action, if appropriate, and be signed by a
Registered Environmental Assessor, Professional
Geologist, or Professional Engineer.
c) Implement the recommendations provided in the
Phase II Environmental Site Assessment report,
where such a report was determined to be necessary
for the construction or operation of the project, for
remedial action.
d) Submit a copy of all applicable documentation
required by local, state, and federal environmental
regulatory agencies, including but not limited to:
permit applications, Phase I and II Environmental Site
Assessments, human health and ecological risk
assessments, remedial action plans, risk
management plans, soil management plans, and
groundwater management plans.
e) Conduct soil sampling and chemical analyses of
samples, consistent with the protocols established by
the U.S. EPA to determine the extent of potential
contamination beneath all underground storage tanks
(USTs), elevator shafts, clarifiers, and subsurface
hydraulic lifts when on-site demolition or construction activities would potentially affect a particular
development or building.
f) Consult with the appropriate local, state, and federal environmental regulatory agencies to ensure
sufficient minimization of risk to human health and
environmental resources, both during and after
construction, posed by soil contamination,
groundwater contamination, or other surface hazards
including, but not limited to, underground storage
tanks, fuel distribution lines, waste pits and sumps.
g) Obtain and submit written evidence of approval for
any remedial action if required by a local, state, or
federal environmental regulatory agency.
h) Cease work if soil, groundwater, or other
environmental medium with suspected contamination
is encountered unexpectedly during construction
activities (e.g., identified by odor or visual staining, or if any underground storage tanks, abandoned drums,
or other hazardous materials or wastes are
encountered), in the vicinity of the suspect material.

Secure the area as necessary and take all
appropriate measures to protect human health and
the environment, including but not limited to,
notification of regulatory agencies and identification
of the nature and extent of contamination. Stop work
in the areas affected until the measures have been
implemented consistent with the guidance of the
appropriate regulatory oversight authority.
i) Soil generated by construction activities should be
stockpiled on-site in a secure and safe manner. All
contaminated soils determined to be hazardous or
non-hazardous waste must be adequately profiled
(sampled) prior to acceptable reuse or disposal at an
appropriate off-site facility. Complete sampling and
handling and transport procedures for reuse or
disposal, in accordance with applicable local, state
and federal laws and policies.
j) Groundwater pumped from the subsurface should be
contained on-site in a secure and safe manner, prior
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-29 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project to treatment and disposal, to ensure environmental
and health issues are resolved pursuant to applicable
laws and policies. Utilize engineering controls, which
include impermeable barriers to prohibit groundwater
and vapor intrusion into the building.
k) As needed and appropriate, prior to issuance of any
demolition, grading, or building permit, submit for
review and approval by the Lead Agency (or other
appropriate government agency) written verification
that the appropriate federal, state and/or local
oversight authorities, including but not limited to the Regional Water Quality Control Board (RWQCB),
have granted all required clearances and confirmed
that the all applicable standards, regulations, and
conditions have been met for previous contamination
at the site.
l) Develop, train, and implement appropriate worker
awareness and protective measures to assure that
worker and public exposure is minimized to an
acceptable level and to prevent any further
environmental contamination as a result of
construction.
m) If asbestos-containing materials (ACM) are found to
be present in building materials to be removed,
submit specifications signed by a certified asbestos
consultant for the removal, encapsulation, or
enclosure of the identified ACM in accordance with all
applicable laws and regulations, including but not
necessarily limited to: California Code of Regulations, Title 8; Business and Professions Code; Division 3;
California Health and Safety Code Section 25915-
25919.7; and other local regulations.
n) Where projects include the demolitions or
modification of buildings constructed prior to 1978,
complete an assessment for the potential presence or
lack thereof of ACM, lead based paint, and any other
building materials or stored materials classified as
hazardous waste by state or federal law.
o) Where the remediation of lead-based paint has been
determined to be required, provide specifications to
the appropriate agency, signed by a certified Lead
Supervisor, Project Monitor, or Project Designer for
the stabilization and/or removal of the identified lead paint in accordance with all applicable laws and
regulations, including but not necessarily limited to:

California Occupational Safety and Health
Administration’s (Cal OSHA’s) Construction Lead
Standard, Title 8 California Code of Regulations
(CCR) Section 1532.1 and Department of Health
Services (DHS) Regulation 17 CCR Sections
35001–36100, as may be amended. If other
materials classified as hazardous waste by state or
federal law are present, the project sponsor should
submit written confirmation to the appropriate local
agency that all state and federal laws and
regulations should be followed when profiling,
handling, treating, transporting, and/or disposing of
such materials.

PMM HAZ-5: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
The construction and operation of the proposed project would not place any permanent or temporary physical barriers on any existing public streets. To ensure compliance with zoning, A. Applicable Mitigation Measures
Impact Sciences, Inc. A-30 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project consider mitigation measures to reduce substantial adverse effects which may impair implementation of or physically interfere with an adopted emergency response plan or
emergency evacuation plan, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) Continue to coordinate locally and regionally based
on ongoing review and integration of projected
transportation and circulation conditions.
b) Develop new methods of conveying projected and
real time information to citizens using emerging
electronic communication tools including social
media and cellular networks;
c) Continue to evaluate lifeline routes for movement of emergency supplies and evacuation.
building and fire codes, the applicant is required to submit appropriate plans for plan review prior to the issuance of a building permit. Adherence to these requirements ensures that the project will not have a significant impact on emergency response and evacuation plans. This mitigation measure is not applicable.

Hydrology and Water Quality
PMM HYD-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects from violation of any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality, as applicable and feasible.

Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Complete, and have approved, a Stormwater
Pollution Prevention Plan (SWPPP) prior to initiation
of construction.
b) Implement Best Management Practices to reduce the
peak stormwater runoff from the project site to the
maximum extent practicable.
c) Comply with the Caltrans storm water discharge
permit as applicable; and identify and implement Best
Management Practices to manage site erosion, wash
water runoff, and spill control.
d) Complete, and have approved, a Standard Urban
Stormwater Management Plan, prior to occupancy of
residential or commercial structures.
e) Ensure adequate capacity of the surrounding
stormwater system to support stormwater runoff from
new or rehabilitated structures or buildings.
f) Prior to construction within an area subject to Section 404 of the Clean Water Act, obtain all required permit
approvals and certifications for construction within the vicinity of a watercourse:
g) Where feasible, restore or expand riparian areas such that there is no net loss of impervious surface as a
result of the project.
h) Install structural water quality control features, such as drainage channels, detention basins, oil and
grease traps, filter systems, and vegetated buffers to
prevent pollution of adjacent water resources by
polluted runoff where required by applicable urban
storm water runoff discharge permits, on new
facilities.
i) Provide operational best management practices for
street cleaning, litter control, and catch basin cleaning are implemented to prevent water quality degradation
in compliance with applicable storm water runoff
Though the proposed project would add typical, urban,
nonpoint source pollutants to stormwater runoff, the proposed project will comply with local regulations as required by the countywide MS4 permit regarding stormwater runoff. This would ensure the proposed project complies with this
Mitigation Measure and would help avoid or reduce the
potential impacts on water quality or related waste discharge requirements that are within the jurisdiction and authority of the Regional Water Quality Control Boards and other regulatory agencies. See Section 10, Hydrology and Water Quality, of the SCEA for further information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-31 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project discharge permits; and ensure treatment controls are
in place as early as possible, such as during the
acquisition process for rights-of-way, not just later
during the facilities design and construction phase.
j) Comply with applicable municipal separate storm
sewer system discharge permits as well as Caltrans’
storm water discharge permit including long-term
sediment control and drainage of roadway runoff.
k) Incorporate as appropriate treatment and control
features such as detention basins, infiltration strips, and porous paving, other features to control surface
runoff and facilitate groundwater recharge into the
design of new transportation projects early on in the
process to ensure that adequate acreage and
elevation contours are provided during the right-ofway acquisition process. l) Upgrade stormwater drainage facilities to
accommodate any increased runoff volumes. These
upgrades may include the construction of detention
basins or structures that will delay peak flows and
reduce flow velocities, including expansion and
restoration of wetlands and riparian buffer areas.

System designs shall be completed to eliminate
increases in peak flow rates from current levels.
m) Encourage Low Impact Development (LID) and
incorporation of natural spaces that reduce, treat,
infiltrate and manage stormwater runoff flows in all
new developments, where practical and feasible.

PMM HYD-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects from violation of any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality, as applicable and feasible.

Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Avoid designs that require continual dewatering
where feasible.

For projects requiring continual dewatering facilities, implement monitoring systems and long-term
administrative procedures to ensure proper water
management that prevents degrading of surface
water and minimizes adverse impacts on
groundwater for the life of the project, Construction
designs shall comply with appropriate building codes
and standard practices including the Uniform
Building Code.
a) Maximize, where practical and feasible, permeable
surface area in existing urbanized areas to protect
water quality, reduce flooding, allow for groundwater
recharge, and preserve wildlife habitat. Minimize
new impervious surfaces, including the use of in-lieu
fees and off-site mitigation.
b) Avoid construction and siting on groundwater
recharge areas, to prevent conversion of those
areas to impervious surface.
c) Reduce hardscape to the extent feasible to facilitate groundwater recharge as appropriate.

Though the proposed project would add typical, urban,
nonpoint source pollutants to stormwater runoff, the proposed project will comply with local regulations as required by the countywide MS4 permit regarding stormwater runoff. This would ensure the proposed project complies with this
Mitigation Measure and would help avoid or reduce the
potential impacts on water quality or related waste discharge requirements that are within the jurisdiction and authority of the Regional Water Quality Control Boards and other regulatory agencies. See Section 10, Hydrology and Water Quality, of the SCEA for further information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-32 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project PMM HYD-4: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures capable of avoiding or reducing the potential impacts of locating structures that would impede or redirect flood flows, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) Ensure that all roadbeds for new highway and rail
facilities be elevated at least one foot above the 100- year base flood elevation. Since alluvial fan flooding
is not often identified on FEMA flood maps, the risk
of alluvial fan flooding should be evaluated and
projects should be sited to avoid alluvial fan flooding.

Delineation of floodplains and alluvial fan boundaries
should attempt to account for future hydrologic
changes caused by global climate change.

The proposed project would not substantially change the site’s drainage patterns and would not alter a discernable drainage course resulting in flooding. The proposed project would be required to submit a drainage plan to the Building Division and the Department of Public Works for review and approval.

Compliance with the City’s drainage plan review and approval process would reduce the likelihood that the proposed project would lead to on-site or off-site flooding. This mitigation measure is not applicable.

Land Use and Planning
PMM LU-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects that physically divide a community, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Facilitate good design for land use projects that build upon and improve existing circulation patterns
b) Encourage implementing agencies to orient
transportation projects to minimize impacts on
existing communities by:
 Selecting alignments within or adjacent to
existing public rights of way.
 Design sections above or below-grade to
maintain viable vehicular, cycling, and
pedestrian connections between portions
of communities where existing
connections are disrupted by the
transportation project.
 Wherever feasible incorporate direct
crossings, overcrossings, or under
crossings at regular intervals for multiple
modes of travel (e.g., pedestrians,
bicyclists, vehicles).
c) Where it has been determined that it is infeasible to avoid creating a barrier in an established
community, consider other measures to reduce
impacts, including but not limited to:
 Alignment shifts to minimize the area
affected.
 Reduction of the proposed right-of-way
take to minimize the overall area of
impact.
 Provisions for bicycle, pedestrian, and
vehicle access across improved
roadways.

The proposed project consists of an infill development within a highly urbanized area of the City of Pasadena. The project would not physically divide an existing community. This mitigation measure is not applicable to the project.

PMM LU-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse This mitigation measure is not applicable to the project as the proposed project would not physically divide an existing community and would not conflict with any land use plan, A. Applicable Mitigation Measures
Impact Sciences, Inc. A-33 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project effects that physically divide a community, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) When an inconsistency with the adopted general
plan policy or land use regulation (adopted for the
purpose of avoiding or mitigating an impact) is
identified modify the transportation or land use
project to eliminate the conflict; or, determine if the environmental, social, economic, and engineering
benefits of the project warrant an amendment to the
general plan or land use regulation.
policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.

Mineral Resources
PMM MIN-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce the use of mineral resources that could be of value to the region, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Provide for the efficient use of known aggregate and mineral resources or locally important mineral
resource recovery sites, by ensuring that the
consumptive use of aggregate resources is
minimized and that access to recoverable sources of
aggregate is not precluded, as a result of
construction, operation and maintenance of projects.
b) Where avoidance is infeasible, minimize impacts to
the efficient and effective use of recoverable sources
of aggregate through measures that have been
identified in county and city general plans, or other
comparable measures such as:
1) Recycle and reuse building materials
resulting from demolition, particularly
aggregate resources, to the maximum
extent practicable.
2) Identify and use building materials,
particularly aggregate materials, resulting
from demolition at other construction sites
in the SCAG region, or within a
reasonable hauling distance of the project
site.
3) Design transportation network
improvements in a manner (such as buffer
zones or the use of screening) that does
not preclude adjacent or nearby extraction
of known mineral and aggregate
resources following completion of the
improvement and during long-term
operations.
4) Avoid or reduce impacts on known
aggregate and mineral resources and
mineral resource recovery sites through
the evaluation and selection of project
sites and design features (e.g., buffers)
that minimize impacts on land suitable for
aggregate and mineral resource extraction
by maintaining portions of MRZ-2 areas in
open space or other general plan land use
categories and zoning that allow for
mining of mineral resources.

No active mining operations exist in the City of Pasadena. The project site is not within any of the areas designated by the City of Pasadena that may contain mineral resources. No active mining operations exist in the City of Pasadena and mining is not currently allowed within any of the City’s designated land uses. This mitigation measure is not
applicable.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-34 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project Noise
PMM NOISE-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects, as applicable and feasible. Such measures may
include the following or other comparable measures identified by the Lead Agency:
a) Install temporary noise barriers during construction. b) Include permanent noise barriers and soundattenuating features as part of the project design.

Barriers could be in the form of outdoor barriers,
sound walls, buildings, or earth berms to attenuate
noise at adjacent sensitive uses.
c) Schedule construction activities consistent with the allowable hours pursuant to applicable general plan
noise element or noise ordinance
d) Post procedures and phone numbers at the
construction site for notifying the Lead Agency staff,
local Police Department, and construction contractor
(during regular construction hours and off-hours),
along with permitted construction days and hours,
complaint procedures, and who to notify in the event
of a problem.
e) Notify neighbors and occupants within 300 feet of the project construction area at least 30 days in advance
of anticipated times when noise levels are expected
to exceed limits established in the noise element of
the general plan or noise ordinance.
f) Designate an on-site construction complaint and
enforcement manager for the project.
g) Ensure that construction equipment are properly
maintained per manufacturers’ specifications and
fitted with the best available noise suppression
devices (e.g., improved mufflers, equipment
redesign, use of intake silencers, ducts, engine
enclosures, and acoustically attenuating shields or
shrouds silencers, wraps). All intake and exhaust
ports on power equipment shall be muffled or
shielded.
h) Use hydraulically or electrically powered tools (e.g., jack hammers, pavement breakers, and rock drills) for
project construction to avoid noise associated with
compressed air exhaust from pneumatically powered
tools. However, where use of pneumatic tools is
unavoidable, an exhaust muffler on the compressed
air exhaust should be used; this muffler can lower
noise levels from the exhaust by up to about 10 dBA.

External jackets on the tools themselves should be
used, if such jackets are commercially available, and
this could achieve a further reduction of 5 dBA.

Quieter procedures should be used, such as drills
rather than impact equipment, whenever such
procedures are available and consistent with
construction procedures.
i) Where feasible, design projects so that they are
depressed below the grade of the existing noisesensitive receptor, creating an effective barrier between the roadway and sensitive receptors.
j) Where feasible, improve the acoustical insulation of There would be no significant noise impacts associated with the proposed project, therefore this Mitigation Measure is not applicable. The proposed project is subject to the following regulatory compliance measures that avoid or reduce the significant effects of noise impacts that are in the jurisdiction and responsibility of public agencies and/or Lead Agencies:

The project must comply with the City of Pasadena Noise Ordinance (Chapter 9.36 of the Pasadena Municipal Code) which establishes exterior noise standards by land use and the maximum duration of time that the noise standards may be exceeded without being considered a nuisance punishable by law. See Section 13, Noise, of the SCEA for more information A. Applicable Mitigation Measures
Impact Sciences, Inc. A-35 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project dwelling units where setbacks and sound barriers do
not provide sufficient noise reduction.
k) Using rubberized asphalt or “quiet pavement” to
reduce road noise for new roadway segments,
roadways in which widening or other modifications
require re-pavement, or normal reconstruction of
roadways where re-pavement is planned
l) Projects that require pile driving or other construction noise above 90 dBA in proximity to sensitive
receptors, should reduce potential pier drilling, pile
driving and/or other extreme noise generating
construction impacts greater than 90 dBA; a set of
site-specific noise attenuation measures should be
completed under the supervision of a qualified
acoustical consultant.
m) Use land use planning measures, such as zoning,
restrictions on development, site design, and buffers
to ensure that future development is compatible with
adjacent transportation facilities and land uses;
n) Monitor the effectiveness of noise reduction
measures by taking noise measurements and
installing adaptive mitigation measures to achieve the
standards for ambient noise levels established by the
noise element of the general plan or noise ordinance.
o) Use equipment and trucks with the best available
noise control techniques (e.g., improved mufflers,
equipment redesign, use of intake silencers, ducts,
engine enclosures, and acoustically attenuating
shields or shrouds, wherever feasible) for project
construction.
p) Stationary noise sources can and should be located
as far from adjacent sensitive receptors as possible
and they should be muffled and enclosed within
temporary sheds, incorporate insulation barriers, or
use other measures as determined by the Lead
Agency (or other appropriate government agency) to
provide equivalent noise reduction.
q) Use of portable barriers in the vicinity of sensitive receptors during construction.
r) Implement noise control at the receivers by
temporarily improving the noise reduction capability
of adjacent buildings (for instance by the use of sound blankets), and implement if such measures are
feasible and would noticeably reduce noise impacts.
s) Monitor the effectiveness of noise attenuation
measures by taking noise measurements.
t) Maximize the distance between noise-sensitive land
uses and new roadway lanes, roadways, rail lines,
transit centers, park-and-ride lots, and other new
noise-generating facilities.
u) Construct sound reducing barriers between noise
sources and noise-sensitive land uses.
v) Stationary noise sources can and should be located
as far from adjacent sensitive receptors as possible
and they should be muffled and enclosed within
temporary sheds, incorporate insulation barriers, or
use other measures as determined by the Lead
Agency (or other appropriate government agency) to
provide equivalent noise reduction.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-36 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project w) Use techniques such as grade separation, buffer
zones, landscaped berms, dense plantings, sound
walls, reduced-noise paving materials, and traffic
calming measures.
x) Locate transit-related passenger stations, central
maintenance facilities, decentralized maintenance
facilities, and electric substations away from sensitive receptors to the maximum extent feasible.
y) Consult the SCAG Environmental Justice Toolbox
for potential measures to address impacts to lowincome and/or minority communities.

PMM NOISE-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to vibration, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) For projects that require pile driving or other
construction techniques that result in excessive
vibration, such as blasting, determine the potential
vibration impacts to the structural integrity of the
adjacent buildings within 50 feet of pile driving
locations.
b) For projects that require pile driving or other
construction techniques that result in excessive
vibration, such as blasting, determine the threshold
levels of vibration and cracking that could damage
adjacent historic or other structure, and design means
and construction methods to not exceed the
thresholds.
c) For projects where pile driving would be necessary
for construction due to geological conditions, utilize
quiet pile driving techniques such as predrilling the
piles to the maximum feasible depth, where feasible.

Predrilling pile holes will reduce the number of blows
required to completely seat the pile and will
concentrate the pile driving activity closer to the
ground where pile driving noise can be shielded more
effectively by a noise barrier/curtain.
d) Restrict construction activities to permitted hours in accordance with local jurisdiction regulation.
e) Properly maintain construction equipment and outfit
construction equipment with the best available noise
suppression devices (e.g., mufflers, silences, wraps).
f) Prohibit idling of construction equipment for
extended periods of time in the vicinity of sensitive
receptors.

Implementation of Mitigation Measures NOI-1 and NOI-2,
listed in Section 13, Noise, of the SCEA, would reduce
potential vibration impacts during project construction to a less than significant level. These mitigation measures are
comparable to PMM NOISE-2 of the SCAG Connect SoCal
EIR.

Population and Housing
PMM-POP-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce the displacement of existing housing, as applicable and feasible. Such measures may include the following or other comparable measures
identified by the Lead Agency:
a) Evaluate alternate route alignments and
transportation facilities that minimize the
displacement of homes and businesses. Use an
The project site does not contain any existing dwelling units.

Therefore, the project would not displace existing housing and this mitigation measure is not applicable.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-37 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project iterative design and impact analysis where impacts to
homes or businesses are involved to minimize the
potential of impacts on housing and displacement of
people.
b) Prioritize the use existing ROWs, wherever feasible. c) Develop a construction schedule that minimizes
potential neighborhood deterioration from protracted
waiting periods between right-of-way acquisition and
construction.
d) Review capacities of available urban infrastructure
and augment capacities as needed to accommodate
demand in locations where growth is desirable to the
local lead Agency and encouraged by the SCS
(primarily TPAs, where applicable).
e) When General Plans and other local land use
regulations are amended or updated, use the most
recent growth projections and RHNA allocation plan.

Public Services
PMM PSP-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects of constructing new emergency response facilities, as applicable and feasible. Such measures may include the
following or other comparable measures identified by the Lead Agency:
• Coordinate with emergency response agencies to
ensure that there are adequate governmental
facilities to maintain acceptable service ratios,
response times or other performance objectives for
emergency response services and that any required
additional construction of buildings is incorporated in to the project description.
• Where current levels of services at the project site are found to be inadequate, provide fair share
contributions towards infrastructure improvements,
as appropriate and applicable, to mitigate identified
CEQA impacts.
• Project sponsors can and should develop traffic
control plans for individual projects. Traffic control
plans should include information on lane closures
and the anticipated flow of traffic during the
construction period. The basic objective of each
traffic control plan (TCP) is to permit the contractor
to work within the public right of way efficiently and
effectively while maintaining a safe, uniform flow of
traffic. The construction work and the public traveling through the work zone in vehicles, bicycles or as
pedestrians must be given equal consideration when
developing a traffic control plan.

This mitigation measure is not applicable to the project as the proposed project would not require the construction or
alteration of emergency response facilities. See Section 15, Public Services, of the SCEA for further information.

PMM PSS-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects of constructing new or physically altered school facilities, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Where construction or expansion of school facilities is required to meet public school service ratios,
require school district fees, as applicable.

This mitigation measure is addressed as the project would require fees to reduce impacts as to a less than significant impact. A fee is collected by the City’s Building Official for PSUD on each residential unit constructed, as well as a fee for non-residential development. Payment of this fee mitigates any impacts on schools.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-38 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project PMM PSL-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects of construction of new or altered library facilities, as applicable and feasible. Such measures may include the
following or other comparable measures identified by the Lead Agency:
a) Where construction or expansion of library facilities is required to meet public library service ratios,
require library fees, as appropriate and applicable, to mitigate identified CEQA impacts.

This mitigation measure is not applicable as the project would not cause a significant impact with regard to library services.

The City as a whole is well served by its Public Information (library) System; and the project would not significantly impact library services and no new or expanded library facilities would be needed.

Recreation
PMM REC-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects on the use of existing neighborhood and regional parks or other recreational facilities, as applicable and feasible. Such measures may include the following or other comparable
measures identified by the Lead Agency:
a) Prior to the issuance of permits, where projects
require the construction or expansion of recreational
facilities or the payment of equivalent Quimby fees,
consider increasing the accessibility to natural areas
and lands for outdoor recreation from the proposed
project area, in coordination with local and regional
open space planning and/or responsible
management agencies.
b) Prior to the issuance of permits, where projects
require the construction or expansion of recreational
facilities or the payment of equivalent Quimby fees,
encourage patterns of urban development and land
use which reduce costs on infrastructure and make
better use of existing facilities, using strategies such as:
i. Increasing the accessibility to natural
areas for outdoor recreation
ii. Utilizing “green” development techniques
iii. Promoting water-efficient land use and
development
iv. Encouraging multiple uses, such as the
joint use of schools
v. Including trail systems and trail segments
in General Plan recreation standards.

In accordance with Ordinance No. 6252, the City collects a park impact fee for each residential unit constructed and on each residential addition over 400 sq. ft. in size. These fees are used to fund land acquisition and capital improvements.

The project itself would not lead to substantial physical deterioration of any recreational facilities, and would have no related significant impacts.

Transportation
PMM-TRA-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects related to transportation-related impacts, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
• Transportation demand management (TDM)
strategies should be incorporated into individual land
use and transportation projects and plans, as part of
the planning process. Local agencies should
incorporate strategies identified in the Federal
Highway Administration’s publication: Integrating
The project would be subject to City standards for vehicle miles traveled (VMT) per capita, proximity and quality of bicycle network, proximity and quality of transit network, and pedestrian accessibility, as well as the Congestion
Management Plan. Transportation impacts were concluded to be less than significant. See Section 17, Transportation, of the SCEA for further information.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-39 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project Demand Management into the Transportation
Planning Process: A Desk Reference (August 2012)
into the planning process (FHWA 2012). For
example, the following strategies may be included to
encourage use of transit and non-motorized modes
of transportation and reduce vehicle miles traveled
on the region’s roadways:
 include TDM mitigation requirements for
new developments;
 incorporate supporting infrastructure for
non-motorized modes, such as, bike
lanes, secure bike parking, sidewalks, and
crosswalks;
 provide incentives to use alternative
modes and reduce driving, such as,
universal transit passes, road and parking
pricing;
 implement parking management
programs, such as parking cash-out,
priority parking for carpools and vanpools;
 develop TDM-specific performance
measures to evaluate project-specific and
system-wide performance;
 incorporate TDM performance measures
in the decision-making process for
identifying transportation investments;
 implement data collection programs for
TDM to determine the effectiveness of
certain strategies and to measure success
over time; and
 set aside funding for TDM initiatives.
 The increase in per capita VMT on
facilities experiencing LOS F represents a
significant impact compared to existing
conditions. To assess whether
implementation of these specific mitigation
strategies would result in measurable
traffic congestion reductions,
implementing actions may need to be
further refined within the overall
parameters of the proposed Plan and
matched to local conditions in any
subsequent project-level environmental
analysis.

PMM TRA-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects which may substantially impair implementation of an adopted emergency response plan or emergency evacuation plan, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Prior to construction, project implementation
agencies can and should ensure that all necessary
local and state road and railroad encroachment
permits are obtained. The project implementation
agency can and should also comply with all
applicable conditions of approval. As deemed
necessary by the governing jurisdiction, the road
The ingress and egress for the site have been evaluated by the PasDOT and found to be adequate for emergency access or access to nearby uses. The project does not involve the elimination of a through-route, does not involve the narrowing of a roadway, and all proposed roadways, access roads and drive lanes meet the Pasadena Fire Department’s access
standards.

The project must comply with all State and local Building, Fire and Safety Codes and plans are subject to review and
approval by the Public Works and the Transportation
Departments, and the Building Division and Fire Department.

Therefore, there will would be no significant impacts related to inadequate emergency access.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-40 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project encroachment permits may require the contractor to
prepare a traffic control plan in accordance with
professional engineering standards prior to
construction. Traffic control plans can and should
include the following requirements:
 Identification of all roadway locations
where special construction techniques
(e.g., directional drilling or night
construction) would be used to minimize
impacts to traffic flow.
 Development of circulation and detour
plans to minimize impacts to local street
circulation. This may include the use of
signing and flagging to guide vehicles
through and/or around the construction
zone.
 Scheduling of truck trips outside of peak
morning and evening commute hours.
 Limiting of lane closures during peak
hours to the extent possible.
 Usage of haul routes minimizing truck
traffic on local roadways to the extent
possible.
 Inclusion of detours for bicycles and
pedestrians in all areas potentially
affected by project construction.
 Installation of traffic control devices as
specified in the California Department of
Transportation Manual of Traffic Controls
for Construction and Maintenance Work
Zones.
 Development and implementation of
access plans for highly sensitive land uses
such as police and fire stations, transit
stations, hospitals, and schools. The
access plans would be developed with the
facility owner or administrator. To
minimize disruption of emergency vehicle
access, affected jurisdictions can and
should be asked to identify detours for
emergency vehicles, which will then be
posted by the contractor. Notify in
advance the facility owner or operator of
the timing, location, and duration of
construction activities and the locations of
detours and lane closures.
 Storage of construction materials only in
designated areas.
 Coordination with local transit agencies for
temporary relocation of routes or bus
stops in work zones, as necessary.
 Ensure the rapid repair of transportation
infrastructure in the event of an
emergency through cooperation among
public agencies and by identifying critical
infrastructure needs necessary for: a)
emergency responders to enter the
region, b) evacuation of affected facilities,
and c) restoration of utilities.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-41 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project  Enhance emergency preparedness
awareness among public agencies and
with the public at large.

Tribal Cultural Resources
PMM TCR-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects on tribal cultural resources, as applicable and feasible.

Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Avoidance and preservation of the resources in place, including, but not limited to, planning and construction to avoid the resources and protect the cultural and
natural context, or planning greenspace, parks, or
other open space, to incorporate the resources with
culturally appropriate protection and management
criteria;
b) Treating the resource with culturally appropriate
dignity taking into account the tribal cultural values
and meaning of the resource, including, but not
limited to, the following: protecting the cultural
character and integrity of the resource; protecting the traditional use of the resource; and protecting the
confidentiality of the resource;
c) Permanent conservation easements or other
interests in real property, with culturally appropriate management criteria for the purposes of preserving
or utilizing the resources or places; and protecting
the resource.

In compliance with this mitigation measure, the Lead Agency has considered mitigation measures consistent with Section 15064.5 of the State CEQA Guidelines and, accordingly,
incorporated a comparable mitigation measure. Mitigation Measure TCR-1, in Section 18, Tribal Cultural Resources, of the SCEA would reduce impacts to tribal cultural resources to a less than significant level.

Utilities and Service Systems
PMM USSW-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce the generation of solid waste, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:

Integrate green building measures with CALGreen (California Building Code Title 24) into project design, including but not limited to the following:
a) Reuse and minimization of construction and
demolition (C&D) debris and diversion of C&D waste
from landfills to recycling facilities.
b) Inclusion of a waste management plan that promotes
maximum C&D diversion.
c) Source reduction through (1) use of materials that are more durable and easier to repair and maintain, (2)
design to generate less scrap material through
dimensional planning, (3) increased recycled content,
(4) use of reclaimed materials, and (5) use of
structural materials in a dual role as finish material
(e.g., stained concrete flooring, unfinished ceilings,
etc.).
d) Reuse of existing structure and shell in renovation
projects.
e) Development of indoor recycling program and space.
f) Discourage the siting of new landfills unless all other This Mitigation Measure is not applicable to the proposed project. Solid waste generated from construction and operation of the proposed project would be able to be sufficiently served by available landfills, and the proposed project would comply with AB 939, which requires California cities to achieve at least a 50 percent diversion rate for all solid waste, and would be subject to PMC Chapters 8.61 and 8.62 relating to waste recycling and construction waste.

Further, the proposed project would be required to meet the standards of California Green Building Standards Code, and would be required to comply with design requirements for refuge storage areas (PMC Section 17.40.120).

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-42 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project waste reduction and prevention actions have been
fully explored. If landfill siting or expansion is
necessary, site landfills with an adequate landfillowned, undeveloped land buffer to minimize the potential adverse impacts of the landfill in neighboring communities.
g) Discourage exporting of locally generated waste
outside of the SCAG region during the construction
and implementation of a project. Encourage disposal
within the county where the waste originates as much
as possible. Promote green technologies for longdistance transport of waste (e.g., clean engines and clean locomotives or electric rail for waste-by-rail
disposal systems) and consistency with SCAQMD
and Connect SoCal policies can and should be
required.
h) Encourage waste reduction goals and practices and
look for opportunities for voluntary actions to exceed
the 80 percent waste diversion target.
i) Encourage the development of local markets for
waste prevention, reduction, and recycling practices
by supporting recycled content and green
procurement policies, as well as other waste
prevention, reduction and recycling practices.
j) Develop ordinances that promote waste prevention
and recycling activities such as: requiring waste
prevention and recycling efforts at all large events
and venues; implementing recycled content
procurement programs; and developing opportunities
to divert food waste away from landfills and toward
food banks and composting facilities.
k) Develop and site composting, recycling, and
conversion technology facilities that have minimum
environmental and health impacts.
l) Integrate reuse and recycling into residential
industrial, institutional and commercial projects.
m) Provide education and publicity about reducing waste and available recycling services.
n) Implement or expand city or county-wide recycling
and composting programs for residents and
businesses. This could include extending the types
of recycling services offered (e.g., to include food
and green waste recycling) and providing public
education and publicity about recycling services.

PMM-USWW-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to reduce substantial adverse effects on utilities and service systems, particularly for construction of wastewater facilities, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
• During the design and CEQA review of individual
future projects, implementing agencies and projects
sponsors shall determine whether sufficient
wastewater capacity exists for the proposed
projects. There CEQA determinations must ensure
that the proposed development can be served by its
existing or planned treatment capacity. If adequate
capacity does not exist, project sponsors shall
The proposed project would be subject to a County Sanitation Districts’ sewer connection fee when the project is hooked up to a sewer line. In order to cover current and future
infrastructure costs for sewer facilities located in the City, the proposed project may also be subject to a Sewer Facility Fee Charge as specified under PMC 4.53, if it is determined that there is an increase in the average daily flow compared to existing conditions. Therefore, impacts on available
wastewater treatment capacity of the wastewater treatment plants that serve the project site would be less than significant.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-43 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project coordinate with the relevant service provider to
ensure that adequate public services and utilities
could accommodate the increased demand, and if
not, infrastructure improvements for the appropriate
public service or utility shall be identified in each
project’s CEQA documentation. The relevant public
service provider or utility shall be responsible for
undertaking project-level review as necessary to
provide CEQA clearance for new facilities.

PMM USWS-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to ensure sufficient water supplies, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Reduce exterior consumptive uses of water in public
areas, and should promote reductions in private
homes and businesses, by shifting to drought-tolerant
native landscape plantings, using weather-based
irrigation systems, educating other public agencies
about water use, and installing related water pricing
incentives.
b) Promote the availability of drought-resistant
landscaping options and provide information on
where these can be purchased. Use of reclaimed
water especially in median landscaping and hillside
landscaping can and should be implemented where
feasible.
c) Implement water conservation best practices such as
low-flow toilets, water-efficient clothes washers,
water system audits, and leak detection and repair.
d) For projects located in an area with existing
reclaimed water conveyance infrastructure and
excess reclaimed water capacity, use reclaimed
water for non- potable uses, especially landscape
irrigation. For projects in a location planned for
future reclaimed water service, projects should
install dual plumbing systems in anticipation of future use. Large developments could treat wastewater
onsite to tertiary standards and use it for nonpotable uses onsite.

This mitigation measure is not applicable for the proposed project. Impacts from the project on water supply are analyzed in Section 19, Utilities and Service Systems, of the SCEA.

Impacts were found to be less than significant and therefore, mitigation is not required.

Wildfire
PMM WF-1: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to wildfire risk, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) Launch fire prevention education for local cities and counties such that local fire agencies, homeowners,
as well as commercial and industrial businesses are
aware of potential sources of fire ignition and the
related procedures to curb or lessen any activities
that might initiate fire ignition.
b) Ensure structures in high fire risk areas are built to current state and federal standards which serve to
greatly increase the chances the structure will survive a wildfire and also allow for people to shelter-in-place. c) Improve road access for emergency response and
evacuation so people can evacuate safely and timely
This mitigation measure is not applicable to the proposed project as impacts would be less than significant. The project site is in a low fire hazard zone. In the event a fire begins during construction or operation of the project, the nearest fire station is the City of Pasadena Fire Station No. 31, located approximately 130 feet from the project site. Being in a developed urban area, there are several fire protection facilities in the project vicinity that could respond to an emergency at the site. There would be a less than significant impact and no mitigation is required.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-44 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Project Level Mitigation Measure Applicability to the Project when necessary.
d) Improve, and educate regarding, local emergency
communications and notifications with residents and
businesses.
e) Enforce defensible space regulations to keep
overgrown and unmanaged vegetation,
accumulations of trash and other flammable material
away from structures.
f) Provide public education about wildfire risk and fire prevention measures, and safety procedures and
practices to allow for safe evacuation and/or options
to shelter-in-place
PMM WF-2: In accordance with provisions of sections
15091(a)(2) and 15126.4(a)(1)(B) of the State CEQA
Guidelines, a Lead Agency for a project can and should
consider mitigation measures to wildfire risk, as applicable and feasible. Such measures may include the following or other comparable measures identified by the Lead Agency:
a) New development or infrastructure activity within
very high hazard severity zones or SRAs shall be
required to
 Submit a fire protection plan including the
designation of fire watch staff;
 Maintain water and other fire suppression
equipment designated solely for
firefighting on site for any construction and
maintenance activities;
 Locate construction and maintenance
equipment in designated “safe areas”
such that they do not discharge
combustible materials; and
 Designate trained fire watch staff during
project construction to reduce risk of fire
hazards.

This mitigation measure is not applicable to the proposed project as impacts would be less than significant. The project site is in a low fire hazard zone. In the event a fire begins during construction or operation of the project, the nearest fire station is the City of Pasadena Fire Station No. 31, located approximately 130 feet from the project site. Being in a developed urban area, there are several fire protection facilities in the project vicinity that could respond to an emergency at the site. There would be a less than significant impact and no mitigation is required.

Source: SCAG Connect SoCal (2020 – 2045 Regional Transportation Plan/ Sustainable Communities Strategy.

Table 2
2015 Pasadena General Plan EIR Applicable Mitigation Measures Mitigation Measure Applicability to the Project
Air Quality
2-1. Prior to issuance of any construction permits, development project applicants shall prepare and submit to the City of Pasadena Planning Division a technical assessment evaluating potential project constructionrelated air quality impacts. The evaluation shall be prepared in conformance with South Coast Air Quality Management District (SCAQMD) methodology for assessing air quality impacts. If construction-related criteria air pollutants are determined to have the potential to exceed the SCAQMDadopted thresholds of significance, the City of Pasadena Planning Division shall require that applicants for new development projects incorporate mitigation measures to reduce air pollutant emissions during construction activities. These identified measures shall be incorporated into all appropriate construction documents (e.g., construction management plans) submitted to the City and shall be verified by the City’s Planning Division. Mitigation measures to reduce construction-related emissions include, but are not limited to:

The proposed project is subject to the South
Coast Air Quality Management District
(SCAQMD) rules and regulations mentioned in
Section 3, Air Quality of the SCEA. Upon
compliance, the project would satisfy the
applicable requirements of this mitigation
measure.

The projects impacts to Air Quality were
analyzed in Section 3, Air Quality, of the SCEA
and were found to be less than significant and
the project would not require any mitigation
measures for this impact.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-45 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 • Requiring fugitive-dust control measures that exceed SCAQMD’s Rule 403, such as:
• Use of nontoxic soil stabilizers to reduce wind erosion • Applying water every four hours to active soil-disturbing activities. • Tarping and/or maintaining a minimum of 24 inches of freeboard on trucks hauling dirt, sand, soil, or other loose materials. • Using construction equipment rated by the United States Environmental Protection Agency as having Tier 3 (model year 2006 or newer) or Tier 4 (model year 2008 or newer) emission limits, applicable for engines between 50 and 750 horsepower. • Ensuring that construction equipment is properly serviced and maintained to the manufacturer’s standards.
• Limiting nonessential idling of construction equipment to no more than five consecutive minutes.
• Using Super-Compliant VOC paints for coating of architectural surfaces whenever possible. A list of Super-Compliant architectural coating manufactures can be found on the SCAQMD’s website at http://www.aqmd.gov/prdas/brochures/SuperCompliant_AIM.pdf.

2.2. Prior to future discretionary project approval, development project applicants shall prepare and submit to the City of Pasadena Planning Division a technical assessment evaluating potential project operation phaserelated air quality impacts. The evaluation shall be prepared in conformance with South Coast Air Quality Management District (SCAQMD) methodology in assessing air quality impacts. If operation-related air pollutants are determined to have the potential to exceed the SCAQMD-adopted thresholds of significance, the City of Pasadena Planning Division shall require that applicants for new development projects incorporate mitigation measures to reduce air pollutant emissions during operational activities. The identified measures shall be included as part of the Standard Conditions of Approval.

Below are possible mitigation measures to reduce long-term emissions:
• For site-specific development that requires refrigerated vehicles, the construction documents shall demonstrate an adequate number of electrical service connections at loading docks for plugin of the anticipated number of refrigerated trailers to reduce idling time and emissions.
• Applicants for manufacturing and light industrial uses shall consider energy storage and combined heat and power in appropriate applications to optimize renewable energy generation systems and avoid peak energy use.
• Site-specific developments with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with California Air Resources Board Rule 2845 (13 CCR Chapter 10 § 2485).
• Site-specific development shall demonstrate that an adequate number of electrical vehicle Level 2 charging stations are provided onsite. The location of the electrical outlets shall be specified on building plans, and proper installation shall be verified by the Building Division prior to issuance of a Certificate of Occupancy. • Applicant-provided appliances shall be Energy Star appliances (e.g., dishwashers, refrigerators, clothes washers, and dryers).

Installation of Energy Star appliances shall be verified by the Building & Safety Division during plan check.
• Applicants for future development projects along existing and planned transit routes shall coordinate with the City of Pasadena, Metro, and Foothill Transit to ensure that bus pads and shelters are incorporated, as appropriate.

The proposed project complies with this
Mitigation Measure as the analysis required by
this measure has been included in the analysis
for the proposed project. The project’s
construction and operational emissions do not
exceed applicable thresholds with compliance
with SCAQMD regulations and implementation
of project-specific mitigation. See Section 3, Air
Quality, of the SCEA for further detail.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-46 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 2-3. Prior to future discretionary project approval, applicants for new industrial or warehousing land uses that 1) have the potential to generate 100 or more diesel truck trips per day or have 40 or more trucks with operating dieselpowered transport refrigeration units, and 2) are within 1,000 feet of a sensitive land use (e.g., residential, schools, hospitals, or nursing homes), as measured from the property line of the project to the property line of the nearest sensitive use, shall submit a health risk assessment (HRA) to the City of Pasadena Planning Division. The HRA shall be prepared in accordance with policies and procedures of the state Office of Environmental Health Hazard Assessment and the South Coast Air Quality Management District. If the HRA shows that the incremental cancer risk and/or noncancer hazard index exceeds the respective thresholds, as established by the SCAQMD at the time a project is considered, the applicant will be required to identify and demonstrate that best available control technologies for toxics (TBACTs), including appropriate enforcement mechanisms, are capable of reducing potential cancer and noncancer risks to an acceptable level. TBACTs may include, but are not limited to, restricting idling onsite or electrifying warehousing docks to reduce diesel particulate matter, or requiring use of newer equipment and/or vehicles. T-BACTs identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site plan.

This Mitigation Measure is not relevant to the
project because the project does not involve
new industrial or warehousing land uses.

2.4. Prior to future discretionary approval, the City of Pasadena Planning Division shall evaluate new development proposals for sensitive land uses (e.g., residences, schools, and day care centers) within the City for potential incompatibilities with regard to the California Air Resources Board’s Air Quality and Land Use Handbook: A Community Health Perspective (April 2005). In addition, applicants for siting or expanding sensitive land uses that are within the recommended buffer distances listed in Table 1-1 of the CARB Handbook shall submit a health risk assessment (HRA) to the City of Pasadena. The HRA shall be prepared in accordance with policies and procedures of the state Office of Environmental Health Hazard Assessment (OEHHA) and the South Coast Air Quality Management District (SCAQMD).

The latest OEHHA guidelines shall be used for the analysis, including age sensitivity factors, breathing rates, and body weights appropriate for children.

If the HRA shows that the incremental cancer risk and/or noncancer hazard index exceeds the respective thresholds, as established by the SCAQMD at the time a project is considered, the applicant will be required to identify and demonstrate that mitigation measures are capable of reducing potential cancer and noncancer risks to an acceptable level (i.e., below the aforementioned thresholds as established by the SCAQMD), including appropriate enforcement mechanisms. Measures to reduce risk may include but are not limited to:
• Air intakes oriented away from high-volume roadways and/or truck loading zones.
• Heating, ventilation, and air conditioning systems of the buildings provided with appropriately sized maximum efficiency rating value (MERV) filters.
• Heating, ventilation, and air conditioning systems for units that are installed with MERV filters shall maintain positive pressure within the building’s filtered ventilation system to reduce infiltration of unfiltered outdoor air
Mitigation measures identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site development plan as a component of the proposed project. The air intake design and MERV filter requirements shall be noted and/or reflected on all building plans submitted to the City and shall be verified by the City’s Planning Division. The intent of this mitigation measure is to reflect current CARB and SCAQMD Guidance/Standards as well as CEQA legislation and case law, and the City implementation of the measure shall adhere to current standards/law at the time such analyses are undertaken.

This Mitigation Measure is not relevant to the
project’s CEQA document as a result of the
2015 California Supreme Court’s decision in the
California Building Industry Association v. Bay
Area Air Quality Management District (2015)
case.

2.5. Prior to future discretionary approval, if it is determined that a project has the potential to emit nuisance odors beyond the property line, an odor This Mitigation Measure is not relevant to the
proposed project as the development of mixed-
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-47 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 management plan shall be prepared by the project applicant, subject to review and approval by the Planning & Community Development Director or their designee. Facilities that have the potential to generate nuisance odors include but are not limited to:
• Wastewater treatment plants
• Composting, green waste, or recycling facilities
• Fiberglass manufacturing facilities
• Painting/coating operations
• Large-capacity coffee roasters
• Food-processing facilities
The odor management plan shall show compliance with the South Coast Air Quality Management District’s Rule 402 for nuisance odors. The Odor Management Plan shall identify the best available control technologies for toxics (T-BACTs) that will be utilized to reduce potential odors to acceptable levels, including appropriate enforcement mechanisms. T-BACTs may include but are not limited to scrubbers (i.e., air pollution control devices) at the industrial facility. TBACTs identified in the odor management plan shall be identified as mitigation measures in the environmental document and/or incorporated into the site plan.
use projects involving residential and
commercial and residential uses are not
typically associated with odor nuisances or
complaints. Further, the project would comply
with SCAQMD Rule 402, which prohibits the
discharge of air contaminants that would cause
injury, detriment, nuisance, or annoyance to the
public.

Biological Resources

3.1. The City of Pasadena shall require applicants of future development projects that disturb undeveloped land in the San Rafael Hills and tract of land at the northwest intersection of Crestford Drive and Florecita Drive, shown on Figure 5.3-2, to prepare a biological resources survey. The survey shall be conducted by a qualified biologist and shall be a reconnaissance level field survey of the project site for the presence and quality of biological resources potentially affected by project development. These resources include, but are not limited to, special status species or their habitat, sensitive habitats such as wetlands or riparian areas, and jurisdictional waters. If sensitive or protected biological resources are absent from the project site and adjacent lands potentially affected by the project, the biologist shall submit a written report substantiating such to the City of Pasadena before issuance of a grading permit by the City, and the project may proceed without any further biological investigation. If sensitive or protected biological resources are present on the project site or may be potentially affected by the project, implementation of Mitigation Measure 3-2 shall be required.

This Mitigation Measure is not relevant to the
proposed project is not located near
undeveloped land in the San Rafael Hills or tract
of land at the northwest intersection of Crestford
Drive and Florecita Drive, shown on Figure 5.3-
2 of the General Plan EIR. The project site is in
an urbanized area within the City of Pasadena.

The project site does not contain any critical
habitat or support any species identified or
designated as a candidate, sensitive, or special
status species in local or regional plans,
policies, or regulations, or by the California
Department of Fish and Game or U.S. Fish and
Wildlife Service. Further the project site is not
located on protected wetlands that are in the
jurisdiction and responsibility of the U.S. Army
Corps of Engineers, public agencies and/or
Lead Agencies.

3.2. A qualified biologist shall evaluate impacts to sensitive or protected biological resources from development. The impact assessment may require focused surveys that determine absence or presence and distribution of biological resources on the site. These surveys may include, but are not limited to: 1) focused special status animal surveys if suitable habitat is present; 2) appropriately timed focused special status plant surveys that will maximize detection and accurate identification of target plant species; and 3) a delineation of jurisdictional boundaries around potential wetlands, riparian habitat, and waters of the United States or State. The results of these surveys will assist in assessing actual project impacts, and with the development of project specific mitigation measures. Alternatively, the project applicant may forgo focused plant and animal surveys and assume presence of special status species in all suitable habitats on the project site. The qualified biologist shall substantiate the impact evaluation or the assumed presence of special-status species in all suitable habitats onsite in a written report submitted to the City of Pasadena before issuance of a grading permit by the City.

This Mitigation Measure is not relevant to the
proposed project is not located near
undeveloped land in the San Rafael Hills or tract
of land at the northwest intersection of Crestford
Drive and Florecita Drive, shown on Figure 5.3-
2 of the General Plan EIR. The project site is
located in an urbanized area of the City, and
therefore the project site is not located within or
adjacent to migratory fish, wildlife species, or
established native resident and/or migratory
wildlife corridors, and native wildlife nursery
sites.

3.3. The City of Pasadena shall require applicants of development project to avoid potential impacts to sensitive or protected biological resources to the greatest extent feasible. Depending on the resources potentially present on the project site, avoidance may include: 1) establishing appropriate nodisturbance buffers around onsite or adjacent resources, and/or 2) initiating This Mitigation Measure is not applicable to the
proposed project as the project is located in a
developed urban area and does not involve the
dispersal of wildlife nor would the project result
in a barrier to migration or movement. This
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-48 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 construction at a time when special status or protected animal species will not be vulnerable to project-related mortality (e.g., outside the avian nesting season or bat maternal or wintering roosting season). Consultation with relevant regulatory agencies may be required in order to establish suitable buffer areas. If the project avoids all sensitive or protected biological resources, no further action is required. If avoidance of all significant impacts to sensitive or protected biological resources is not feasible, the project shall implement Mitigation Measure 3-4.

Mitigation Measure is not relevant to the
proposed project as the project site does not
contain any critical habitat or support any
species identified or designated as a candidate,
sensitive, or special status species in local or
regional plans, policies, or regulations, or by the
California Department of Fish and Game or U.S.

Fish and Wildlife Service. The project site is
located in an urbanized area of the City and is
not identified as a vegetation zone that could
serve as species’ habitat. The project would
also comply with the Migratory Bird Treaty Act
which governs the taking, killing, possession,
transportation, and importation of migratory
birds, their eggs, parts, and nests.

3.4. The City of Pasadena shall require applicants to design development projects to minimize potential impacts to sensitive or protected biological resources to the greatest extent feasible, in consultation with a qualified biologist and/or appropriate regulatory agency staff. Minimization measures may include 1) exclusion and/or silt fencing, 2) relocation of impacted resources, 3) construction monitoring by a qualified biologist, and 4) an informative training program conducted by a qualified biologist for construction personnel on sensitive biological resources that may be impacted by project construction. If minimization of all significant impacts to sensitive or protected biological resources is infeasible, the project shall implement Mitigation Measure 3-5.

This Mitigation Measure is not applicable to the
proposed project as the project is located in a
developed urban area and does not involve the
dispersal of wildlife nor would the project result
in a barrier to migration or movement. This
Mitigation Measure is not relevant to the
proposed project as the project site does not
contain any critical habitat or support any
species identified or designated as a candidate,
sensitive, or special status species in local or
regional plans, policies, or regulations, or by the
California Department of Fish and Game or U.S.

Fish and Wildlife Service. The project site is
located in an urbanized area of the City and is
not identified as a vegetation zone that could
serve as species’ habitat. The project would
also comply with the Migratory Bird Treaty Act
which governs the taking, killing, possession,
transportation, and importation of migratory
birds, their eggs, parts, and nests.

3.5. A qualified biologist will develop appropriate mitigations that will reduce project impacts to sensitive or protected biological resources to a less than significant level, if feasible. The type and amount of mitigation will depend on the resources impacted, the extent of the impacts, and the quality of habitats to be impacted. Mitigations may include, but are not limited to: 1) compensation for lost habitat or waters in the form of preservation or creation of in-kind habitat or waters, either onsite or offsite, protected by conservation easement; 2) purchase of appropriate credits from an approved mitigation bank servicing the Pasadena area; and 3) payment of in-lieu fees.

This Mitigation Measure is not applicable to the
proposed project as the project is located in a
developed urban area and does not involve the
dispersal of wildlife nor would the project result
in a barrier to migration or movement. This
Mitigation Measure is not relevant to the
proposed project as the project site does not
contain any critical habitat or support any
species identified or designated as a candidate,
sensitive, or special status species in local or
regional plans, policies, or regulations, or by the
California Department of Fish and Game or U.S.

Fish and Wildlife Service. The project site is
located in an urbanized area of the City and is
not identified as a vegetation zone that could
serve as species’ habitat. The project would
also comply with the Migratory Bird Treaty Act
which governs the taking, killing, possession,
transportation, and importation of migratory
birds, their eggs, parts, and nests.

3.6. Applicants of projects developed pursuant to the General Plan Update shall obtain appropriate permit authorization(s) for impacts to jurisdictional waters, wetlands, and/or riparian habitats. The types of permits potentially required for impacts to jurisdictional waters are a Clean Water Act (Section 404) permit issued by the US Army Corps of Engineers, a California Water Certificate or Waste Discharge Order issued by the Regional Water Quality Control Board, and a Stream Alteration Agreement issued by the California Department of Fish and Wildlife
This Mitigation Measure is not relevant to the
proposed project as the project site is not
located on protected wetlands or other
jurisdictional waters that are in the jurisdiction
and responsibility of the U.S. Army Corps of
Engineers, the Regional Water Quality Control
Board, or the California Department of Fish and
Wildlife.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-49 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Cultural Resources

4.1. If cultural resources are discovered during construction of land development projects in Pasadena that may be eligible for listing in the California Register for Historic Resources, all ground disturbing activities in the immediate vicinity of the find shall be halted until the find is evaluated by a Registered Professional Archaeologist. If testing determines that significance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; and provide a comprehensive final report including site record to the City and the South Central Coastal Information Center at California State University Fullerton. No further grading shall occur in the area of the discovery until Planning Department approves the report.

The proposed project would not result in a
substantial adverse change in the significance
of the Old Pasadena Historic District or the
Hotel Green/Castle Green or the building at 84
South Fair Oaks Avenue. Impacts on historical
resources are less than significant and no
mitigation measures are required. See Section
5, Cultural Resources, of the SCEA for further
information.

4.2. The City shall require applicants for development permits that involve grading in areas within the paleontologically sensitive Topanga formation (see Figure 5.4-2 of the DEIR) to provide studies by a qualified paleontologist assessing the sensitivity of the project for buried paleontological resources.

On properties determined to be moderately to highly sensitive for paleontological resources, such studies shall provide a detailed mitigation plan, including a monitoring program and recovery and/or in situ preservation plan, based on the recommendations of a qualified paleontologist. The mitigation plan shall include the following requirements:
• A paleontologist shall be retained for the project and will be on call during grading and other significant ground-disturbing activities more than six feet below the ground surface.
• Should any potentially significant fossil resources be discovered, no further grading shall occur in the area of the discovery until the Planning and Community Development Director concurs in writing that adequate provisions are in place to protect any significant resources. Work may continue outside a minimum radius of 25 feet from the discovery pending review by the Director.
• Unanticipated discoveries shall be evaluated for significance by a qualified paleontologist. If evaluation determines that significance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; and provide a comprehensive final report, including catalog with museum numbers.

This Mitigation Measure is not relevant to the
proposed project is not located within the
Topanga formation , as shown on Figure 5.4-2
of the City’s General Plan EIR.

Greenhouse Gas Emissions

5.1. Within approximately 18 months of adoption of the proposed General Plan Update, the City of Pasadena shall prepare and present to the City Council for adoption a community climate action plan/greenhouse gas reduction plan (Plan). The Plan shall identify strategies to be implemented to reduce GHG emissions associated with the City, and shall include as one alternative a program that achieves the AB 32 targets. In addition, the City shall monitor GHG emissions by updating its community-wide GHG emissions inventory every five years upon adoption of the initial Plan. Upon the next update to the Plan, the inventory, GHG reduction measures, and GHG reductions shall be forecast to year 2035 to ensure progress toward achieving the interim target that aligns with the longterm GHG reduction goals of Executive Order S-03-04. The Plan update shall take into account the reductions achievable from federal and state actions and measures as well as ongoing work by the City and the private sector. The 2035 Plan update shall be completed by January 1, 2021, with a plan to achieve GHG reductions for 2035 or 2040, provided the state has an actual plan to achieve reductions for 2035 or 2040. New reduction programs in similar sectors as the proposed Plan (building energy, transportation, waste, water, wastewater, agriculture, and others) will likely be necessary. Future targets shall be considered in alignment with state reduction targets, to the maximum extent feasible, but it is premature at this time to determine whether or not such targets can be feasibly met through the combination of federal, state, and local action given technical, logistical and financial constraints. Future updates to the Plan shall account for the horizon beyond 2035 as the state This Mitigation Measure is not relevant to the
proposed project as the development of a
community action plan/greenhouse reduction
plan is a City-directed measure and is under
City jurisdiction. It is not applicable at the project
level. Furthermore, impacts regarding the
generation of greenhouse gas emissions were
analyzed in Section 8, Greenhouse Gas
Emissions, in the SCEA. The proposed project
would be consistent with the Pasadena Climate
Action Plan by incorporating applicable actions
intended to ensure that the project contributes
its fair share to the City’s cumulative GHG
reduction goals. The project would have a less
than significant GHG impact and therefore
mitigation is not required.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-50 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 adopts actual plans to meet post-2035 targets. In all instances, the Plan and any updates shall be consistent with state and federal law Noise

9.1. Prior to issuance of building and occupancy permits, applicants of industrial projects that involve vibration-intensive machinery or activities adjacent to sensitive receptors shall prepare a study to evaluate potential vibration impacts. The study shall prepared by an acoustical engineer and be submitted to the City of Pasadena Planning Division. The study shall evaluate the vibration levels associated with operation of project-related equipment and activities experienced by nearby sensitive receptors. If it is determined that vibration impacts to nearby receptors exceed the Federal Transit Administration (FTA) vibration-annoyance criterion, the study shall recommend and the applicant shall implement the identified measures with the purpose of reducing vibration impacts to a less than significant level. The City of Pasadena shall verify implementation of all identified measures.

Implementation of Mitigation Measures NOI-1
and NOI-2, listed in Section 13, Noise, of the
SCEA, would reduce potential vibration impacts
during project construction to a less than
significant level.

9.2. Prior to issuance of building permits for the new construction of habitable area, applicants for development projects shall adhere to the appropriate Vibration Category 2 and Vibration Category 3 screening distances for light rail transit as recommended in Table 9- 2 of the Federal Transit Administration’s (FTA) Transit Noise and Vibration Impact Assessment (FTA 2006) in evaluating vibration impacts related to trains on the Metro Gold Line.

Applicants for development projects that fall within the screening distances shall prepare and submit to the City of Pasadena Planning Division a study evaluating vibration impacts to the proposed development from train operations. The study shall be prepared by an acoustical engineer who shall identify measures to reduce impacts to habitable structures to below the FTA vibration annoyance criterion. The identified measures shall be incorporated into all design plans submitted to the City of Pasadena.

This Mitigation Measure is not relevant to the
proposed project since the project site would not
be within the FTA screening distances for light
rail transit. FTA recommended screening
distance for light rail transit in relation to
residential uses is 150 feet between the rail
tracks and the property line. The nearest station
is approximately one-quarter mile and therefore,
the proposed project would be outside of the
appropriate screening distances for light rail
transit and would not be affected by vibration
impacts from train operations.

9.3. Prior to issuance of any grading and construction permits, applicants for individual projects that involve vibration-intensive construction activities, such as pile drivers, jack hammers, and vibratory rollers, within 25 feet of sensitive receptors (e.g., residences and historic structures) shall prepare and submit to the City of Pasadena Planning Division a study to evaluate potential construction-related vibration impacts. The study shall be prepared by an acoustical engineer and shall identify measures to reduce impacts to habitable structures to below the FTA vibration annoyance criterion. If construction-related vibration is determined to be perceptible at vibrationsensitive uses, additional requirements, such as use of less-vibrationintensive equipment or construction technique, shall be implemented during construction (e.g., drilled piles, static rollers, and nonexplosive rock blasting).

Identified measures shall be included on all construction and building documents and submitted for verification to the City of Pasadena Planning Division.

Implementation of Mitigation Measures NOI-1
and NOI-2, listed in Section 13, Noise, of the
SCEA, would reduce potential vibration impacts
during project construction to a less than
significant level.

9.4. Prior to issuance of any construction permits, applicants for individual projects that involve vibration-intensive construction activities, such as pile drivers, jack hammers, bulldozers, and vibratory rollers, within 25 feet of sensitive receptors (e.g., residences) or 50 feet of historic structures, shall prepare and submit to the City of Pasadena Planning Division a study to evaluate potential construction-related vibration impacts. The vibration assessment shall be prepared by an acoustical engineer and be based on the FTA vibration-induced architectural damage criterion. If the study determines a potential exceedance of the FTA thresholds, measures shall be identified that ensure vibration levels are reduced to below the thresholds.

Measures to reduce vibration levels can include use of less-vibrationintensive equipment (e.g., drilled piles and static rollers) and/or construction techniques (e.g., nonexplosive rock blasting and use of hand tools) and preparation of a preconstruction survey report to assess the condition of the affected sensitive structure. Notwithstanding the above, pile drivers shall not be allowed within 150 feet of any historic structures. Identified measures shall be included on all construction and building documents and submitted for verification to the City of Pasadena Planning Division.

Implementation of Mitigation Measures NOI-1
and NOI-2, listed in Section 13, Noise, of the
SCEA, would reduce potential vibration impacts
during project construction to a less than
significant level.

A. Applicable Mitigation Measures
Impact Sciences, Inc. A-51 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 Prior to issuance of construction permits, applicants for new development projects within 500 feet of noise-sensitive receptors shall implement the following best management practices to reduce construction noise levels:
• Consider the installation of temporary sound barriers for construction activities immediately adjacent to occupied noisesensitive structures. • Equip construction equipment with mufflers.
• Restrict haul routes and construction-related traffic. • Reduce nonessential idling of construction equipment to no more than five minutes
The identified best management practices shall be noted on all site plans and/or construction management plans and submitted for verification to the City of Pasadena Planning Division.

The project would comply with this measure as
noise levels from construction equipment would
comply to PMC Section 9.36, which restricts
noise from construction equipment to 85 dBA,
and limits hours of operation.

Transportation

13.1. The City of Pasadena shall update its existing transportation impact fee program by 2020. The City shall prepare a “Nexus” Study that will serve as the basis for requiring development impact fees under AB 1600 legislation, as codified by California Code Government Section 66000 et seq. The established procedures under AB 1600 require that a “reasonable relationship” or nexus exist between the traffic improvements and facilities required to mitigate the traffic impacts of new development pursuant to the proposed project. After approval of the Nexus Study, the City shall update the transportation impact fee program to fund all citywide circulation improvements, including the pedestrian and bicycle network. The fee program shall stipulate that fees are assessed when there is new construction or when there is an increase in square footage within an existing building or the conversion of existing square footage to a more intensive use.

Fees are calculated by multiplying the proposed square footage or dwelling unit by the rate identified. The fees are included with any other applicable fees payable at the time the building permit is issued. The City will use the development fees to fund construction (or to recoup fees advanced to fund construction).

This Mitigation Measure is not relevant to the
proposed project as updating the City’s
transportation impact fee program is a City
directed measure and is under City jurisdiction.

It is not applicable at the project level.

Source: City of Pasadena General Plan EIR 2015.

Table 3
Central District Specific Plan EIR Applicable Mitigation Measures Mitigation Measure Applicability to the Project
Aesthetics
The following mitigation measure will be applied at the individual project level to avoid potential new light and glare effects.

1. For development proposals subject to environmental review and/or design review, the City will examine potential light and glare effects associated with structures and on-site activities, and will ensure that features are incorporated into projects to avoid any adverse light and glare impacts.

2. The Zoning Code will limit the use of reflective and glare-producing building materials.

3. The Zoning Code will require that all nighttime lighting be focused down onto the site and not onto adjacent properties.

4. The City will establish a program to encourage the use of low wattage bulbs in nighttime lighting by offering an incentive that discounting the cost of energy- conserving nighttime lighting.

This Mitigation Measure is not relevant to the
proposed project as Public Resources Code
Section 21099, enacted by Senate Bill 743,
provides that “aesthetic and parking impacts of
a residential, mixed-use residential, or
employment center project on an infill site within
a transit priority area shall not be considered
significant impacts on the environment.”
The project site is located in an urbanized area
within the City of Pasadena. The proposed
project is a 6-story plus mezzanine transitoriented mixed-use development that includes retail, restaurants, and work/live units at the
ground level and mixed-rate apartment units on
levels 2-6. The project site is located less than
one-quarter mile from the Metro Del Mar L Line
(formerly Gold Line) station and less than onehalf a mile to the Memorial Park Station.

Therefore, the proposed project is located in a
transit priority area as defined in Public
Resources Code Section 21099. The proposed
A. Applicable Mitigation Measures
Impact Sciences, Inc. A-52 Central Park Apartments
Sustainable Communities Environmental Assessment September 2020 project’s aesthetic impacts shall not be
considered significant impacts on the
environment pursuant to Public Resources
Code Section 21099.

Air Quality
At the individual development project level, the City will apply the following mitigation measures which will work toward regional emissions reductions:

The City will encourage the incorporation of energy conservation techniques (i.e. installation of energy saving devices, construction of electric vehicle charging stations, use of sunlight-filtering window coatings or double-paned windows, utilization of light-colored roofing materials as opposed to darkcolored roofing materials, and placement of shady trees next to habitable structures) in new developments.

The proposed project is subject to the South
Coast Air Quality Management District
(SCAQMD) rules and regulations mentioned in
Section 3, Air Quality of the SCEA. Upon
compliance, the project would satisfy the
applicable requirements of this mitigation
measure.

The projects impacts to Air Quality were
analyzed in Section 3, Air Quality, of the SCEA
and were found to be less than significant and
the project would not require any mitigation
measures for this impact.

Noise

1. If a 15-20 dBA reduction is needed, the following shall be included in development projects as directed by the Building Official:
• Air conditioning or a mechanical ventilation system
• Windows and sliding glass doors should be double-paned glass and mounted in low air infiltration rate frames (0.5 cfm or less, per American National Standard Institute [ANSI] specifications) • Solid core exterior doors with perimeter weather stripping and threshold seals

2. If a 20-25 dBA reduction is needed, the following shall be included in development projects as directed by the Building Official:
• Same as No. 1(a) – (c)
• Exterior walls consist of stucco or brick veneer. Wood siding with a 1/2” minimum thickness fiberboard underlayer may also be used • Glass in both windows and doors should not exceed 20% of the floor area in a room
• Roof or attic vents facing the noise source should be baffled

3. If a 25-30 dBA reduction is needed, the following shall be included in development projects as directed by the Building Official:
• Same as No. 2(a) – (d)
• The interior sheetrock of exterior wall assemblies should be attached to studs by resilient channels. Staggered studs or double walls are acceptable alternatives
• Window assemblies should have a laboratory-tested STC rating of 30 or greater (Windows that provide superior noise reduction capability and that are laboratory-tested are sometimes called “sound-rated” windows. In general, these windows have thicker glass and/or increased air space between panes. In contrast, standard energy conservation double-pane glazing with a 1/8” or 1/4” air space may be less effective in reducing noise from some noise sources than single pane glazing).

This proposed project is not anticipated to have
a significant noise impact and therefore would
not require noise mitigation for nearby
receptors.

Source: City of Pasadena, 2004 Land Use and Mobility Elements, Zoning Code Revisions, and Central District Specific Plan EIR

APPENDIX B
Air Quality
Air Quality Impact Assessment
Impact Sciences, Inc. 1 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1

1.0 INTRODUCTION
This study describes the existing air quality of the proposed mixed-use development at 86 S. Fair Oaks Avenue, and evaluates the potential air quality impacts. This report has been prepared by Impact Sciences, Inc., under contract to the City of Pasadena, in support of the environmental documentation being prepared pursuant to the California Environmental Quality Act (CEQA). This analysis considers both the temporary air quality impacts that would result from project construction and the long-term impacts associated with the operation of the project.

1.1 Project Location
The 86 S. Fair Oaks Avenue project site in the City of Pasadena is bounded by S. Fair Oaks Avenue to the west, Dayton Street to the south, Castle Green to the east, and the Green Hotel Apartments to the north.

The Project site is located within the boundaries of the Old Pasadena National Register Historic District and the Hotel Green National Register listing. Major transportation facilities in the vicinity of the proposed project site include the Del Mar Metro Gold Line Station located 800 feet from the site and the Memorial Park Metro Gold Line Station located 0.4 miles from the site.

1.2 Project Description
The proposed project is a 6-story plus mezzanine transit-oriented mixed-use development that includes retail, restaurants, and work/live units at the ground level and mixed-rate apartment units on levels 2-6.

Along Fair Oaks Avenue, the ground floor of the proposed building includes approximately 6,200 square feet of retail and food uses. Four work/live units, approximately 1,300 square feet each, are proposed in the ground floor along Dayton Street, facing Central Park. The proposed project contains 84 apartment units (24 studios, 37 one-bedroom flats, three (3) one-bedroom townhouses, 18 two-bedroom flats, and two (2) two-bedroom townhouses), including eight (8) on-site residences for very low-income residents. All parking for the proposed project would be located in four (4) levels of underground parking that accommodate 195 parking spaces, including replacement of existing parking spaces for the adjacent Green Hotel Apartments, which currently utilizes the surface parking located on the project site.

The proposed project would include amenity space for project residents, including a swimming pool and spa with cabana and changing rooms, gym, lounge and multiple roof decks/terraces.

The proposed project would provide 16,231 sf of open space, which would be divided between approximately 12,037 sf of hardscape and 4,194 sf of landscape (softscape). Landscaping for the proposed project would include native and adaptive species that are drought tolerant. The proposed project would include 38 new trees, including one 96” box tree, 10 - 60” box trees, 21 - 24” box trees and 6 – 36” box trees.

Impact Sciences, Inc. 2 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1

2.0 AIR QUALITY

2.1 Air Quality Setting
South Coast Air Basin
South Coast Air Basin Characteristics
The California Air Resources Board (CARB) divides the state into air basins that share similar meteorological and topographical features. The City of Pasadena is located within the South Coast Air Basin (SCAB), which incorporates approximately 12,000 square miles consisting of Orange County and the non-desert portions of Los Angeles, Riverside, and San Bernardino Counties, in addition to the San Gorgonio Pass area in Riverside County. The SCAB is a coastal plain with connecting broad valleys and low hills, bounded by the Pacific Ocean to the southwest and high mountains around the rest of its perimeters.

Temperature and Precipitation
The general region lies in the semi-permanent high-pressure zone of the eastern Pacific, resulting in a mild climate tempered by cool sea breezes with light average wind speeds. It is considered semi-arid and is characterized by warm summers, mild winters, infrequent seasonal rainfall, moderate daytime onshore breezes, and moderate humidity. This usually mild climatological pattern is interrupted occasionally by periods of extremely hot weather, winter storms, or Santa Ana winds. The annual average temperature varies little throughout the SCAB region, ranging from the low 60s to the high 80s, measures in degrees Fahrenheit (F°). With a more pronounced oceanic influence, coastal areas show less variability in annual minimum and maximum temperatures than inland areas.

In contrast to a very steady pattern of temperature, rainfall is seasonally and annually highly variable.

Almost all annual rains fall between November and April. Summer rainfall is normally restricted to widely scattered thundershowers near the coast, with slightly heavier shower activity in the east and over the mountains.

Humidity
Although the SCAB has a semiarid climate, the air near the earth’s surface is typically moist because of the presence of a shallow marine layer. Except for infrequent periods when dry, continental air is brought into the SCAB by offshore winds, the “ocean effect” is dominant. Periods of heavy fog, especially along the Impact Sciences, Inc. 3 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
coast, are frequent, and low clouds, often referred to as high fog, are a characteristic climate feature. Annual average humidity is 70 percent at the coast and 57 percent in the eastern portions of the SCAB.

Wind
Wind patterns across the south coastal region are characterized by westerly or southwesterly onshore winds during the day and by easterly or northeasterly breezes at night. Wind speed is higher during the dry summer months than during the rainy winter.

Between periods of wind, air stagnation may occur in both the morning and evening hours. Air stagnation is one of the critical determinants of air quality conditions on any given day. During the winter and fall, surface high-pressure systems over the SCAB, combined with other meteorological conditions, can result in very strong, downslope Santa Ana winds. These winds normally continue a few days before predominant meteorological conditions are reestablished.

The mountain ranges to the east affect the diffusion of pollutants by inhibiting the eastward transport of pollutants. Air quality in the SCAB generally ranges from fair to poor and is similar to air quality in most of coastal Southern California. The entire region experiences heavy concentration of air pollutants during prolonged periods of stable atmospheric conditions.

Inversions
In conjunction with the two characteristic wind patterns that affect the rate and orientation of horizontal pollutant transport, two similarly distinct types of temperature inversions control the vertical depth through which pollutants are mixed. These inversions are the marine/subsidence inversion and the radiation inversion. The height of the base of the inversion at any given time is known as the “mixing height.” The combination of winds and inversions is a critical determinant leading to highly degraded air quality in the summer and generally good air quality in the winter in Pasadena.

Air Pollutants of Concern
Criteria air pollutants are defined as pollutants for which the federal and state governments have established ambient air quality standards for outdoor concentrations. The federal and state ambient air quality standards have been set at levels above which concentrations could be harmful to human health and welfare. These standards are designed to protect the most sensitive persons such as children, pregnant women, and the elderly, from illness or discomfort. Criteria air pollutants include ozone (O3), nitrogen dioxide (NO2), carbon monoxide (CO), sulfur dioxide (SO2), particulate matter 2.5 microns or less in diameter (PM2.5), particulate matter ten microns or less in diameter (PM10), and lead (Pb). Note that Impact Sciences, Inc. 4 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
Reactive Organic Gases (ROGs), which are also known as reactive organic compounds (ROCs) or volatile organic compounds (VOCs), and Nitrogen oxide (NOx) are not classified as criteria pollutants. However, ROGs and NOx are widely emitted from land development projects and participate in photochemical reactions in the atmosphere to form O3; therefore, NOx and ROGs are relevant to the proposed project and are of concern in the air basin and are listed below along with the criteria pollutants. Sources and health effects commonly associated with criteria pollutants are summarized in Table 1, Criteria Pollutants Summary of Common Sources and Effects.

Table 1
Criteria Pollutants Summary of Common Sources and Effects Pollutant Major Man-Made Sources Human Health & Welfare Effects Carbon Monoxide
(CO)
An odorless, colorless gas formed when carbon in
fuels is not burned completely; a component of
motor vehicle exhaust.

Reduces the ability of blood to deliver oxygen to
vital tissues, affecting the cardiovascular and
nervous system. Impairs vision, causes dizziness,
and can lead to unconsciousness or death.

Nitrogen Dioxide
(NO2)
A reddish-brown gas formed during fuel
combustion for motor vehicles and industrial
sources. Sources include moto vehicles, electric
utilities, and other sources that burn fuel.

Respiratory irritant; aggravates lung and heart
problems. Precursor to ozone and acid rain.

Contributes to global warming and nutrient
overloading which deteriorates water quality.

Causes brown discoloration of the atmosphere.

Ozone (O3)
Formed by a chemical reaction between volatile
organic compounds (VOC) and nitrous oxides
(NOx) in the presence of sunlight. VOCs are also
commonly referred to as reactive organic gases
(ROGs). Common sources of these precursor
pollutants include motor vehicle exhaust,
industrial emissions, gasoline storage and
transport, solvents, paints, and landfills.

Irritates and causes inflammation of the mucous
membranes and lung airways; causes wheezing,
coughing, and pain when inhaling deeply;
decreases lung capacity; aggravates lung and heart
problems. Damages plants; reduces crop yield.

Damages rubber, some textiles, and dyes.

Particulate Matter
(PM10 & PM2.5)
Produced by power plants, steel mills, chemical
plants, unpaved roads and parking lots, woodburning stoves and fireplaces, automobiles, and others.

Increased respiratory symptoms, such as irritation
of the airways, coughing or difficulty breathing;
aggravated asthma; development of chronic
bronchitis; irregular heartbeat; nonfatal heart
attacks; and premature death in people with heart
or lung disease. Impairs visibility (haze).

Sulfur Dioxide (SO2)
A colorless, nonflammable gas formed when fuel
containing sulfur is burned; when gasoline is
extracted from ore. Examples are petroleum
refineries, cement manufacturing, metal
processing facilities, locomotives, and ships.

Respiratory irritant; aggravates lung and heart
problems. In the presence of moisture and oxygen,
sulfur dioxide converts to sulfuric acid which can
damage marble, iron, and steel. Damages crops
and natural vegetation. Impairs visibility.

Precursor to acid rain.

Source: CAPCOA, 2013.

Impact Sciences, Inc. 5 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
Ambient Air Quality
Criteria Air Pollutant Monitoring Data
Ambient air quality in Pasadena can be inferred from ambient air quality measurements conducted at nearby air quality monitoring stations. Existing levels of ambient air quality and historical trends and projections in the vicinity of Pasadena are documented by measurements made by the South Coast Air Quality Management District (SCAQMD), the air pollution regulatory agency in the SCAB regions maintains air quality monitoring stations which process ambient air quality measurements.

The purpose of the monitoring station is to measure ambient concentrations of pollutants and determine whether ambient air quality meets the National Ambient Air Quality Standards (NAAQS) and the California Ambient Air Quality Standards (CAAQS). Ozone and particulate meter (PM10 and PM2.5) are pollutants of particular concern in the SCAB. The monitoring stations located closest to the proposed project site and most representative of air quality near the project site are the Pasadena South Wilson Avenue station, located approximately 1.5 miles southeast of the project site, and the Los Angeles North Main Street station, located approximately 7.0 miles southwest of the project site. Ambient emission concentrations vary due to localized variations in emissions sources and climate and should be considered “generally” representative of ambient concentrations in Pasadena. The Pasadena South Wilson Avenue station monitors O3, PM2.5, and NO2, see Table 2, Pasadena South Wilson Avenue Air Monitoring Station Ambient Pollutant Concentrations. The Los Angles North Main Street station monitors O3, PM2.5, PM10, and NO2, see Table 3, Los Angeles North Main Street Air Monitoring Station Ambient Pollutant Concentrations.

Table 2
Pasadena South Wilson Avenue Air Monitoring Station Ambient Pollutant Concentrations Pollutant Standards1
Year
2016 2017 2018
OZONE (O3)
Maximum 1-hour concentration monitored (ppm) 0.126 0.139 0.112 Maximum 8-hour concentration monitored (ppm) 0.090 0.100 0.090 Number of days exceeding state 1-hour standard 0.09 ppm 12 18 8 Number of days exceeding federal/state 8-hour standard 0.070 ppm 18 36 19 NITROGEN DIOXIDE (NO2)
Maximum 1-hour concentration monitored (ppm) 0.0719 0.0723 0.0682 Annual average concentration monitored (ppm) 0.015 0.015 0.014 Number of days exceeding state 1-hour standard 0.18 ppm 0 0 0 FINE PARTICULATE MATTER (PM2.5)
Impact Sciences, Inc. 6 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
Pollutant Standards1
Year
2016 2017 2018
Maximum 24-hour concentration monitored (µg/m3) 29.2 22.8 32.5 Annual average concentration monitored (µg/m3) 9.5 9.6 10.2 Number of samples exceeding federal standard 35 µg/m3 0 0 0 Source: California Air Resources Board, “Air Quality Data Statistics,” http://www.arb.ca.gov/adam/. 2019.

NA = not available
1 Parts by volume per million of air (ppm), micrograms per cubic meter of air (µg/m3), or annual arithmetic mean (aam). 2 The 8-hour federal O3 standard was revised from 0.075 ppm to 0.070 ppm in 2015. The statistics shown are based on the 2015 standard of

0.070 ppm.

Table 3
Los Angeles North Main Street Air Monitoring Station Ambient Pollutant Concentrations Pollutant Standards1
Year
2016 2017 2018
OZONE (O3)
Maximum 1-hour concentration monitored (ppm) 0.103 0.116 0.098 Maximum 8-hour concentration monitored (ppm) 0.078 0.086 0.073 Number of days exceeding state 1-hour standard 0.09 ppm 2 6 2 Number of days exceeding federal/state 8-hour standard 0.070 ppm 4 14 4 NITROGEN DIOXIDE (NO2)
Maximum 1-hour concentration monitored (ppm) 0.065 0.081 0.070 Annual average concentration monitored (ppm) 0.021 0.021 0.019 Number of days exceeding state 1-hour standard 0.18 ppm 0 0 0 RESPIRABLE PARTICULATE MATTER (PM10)
Maximum 24-hour concentration monitored (µg/m3) 74.6 96.2 81.2 Annual average concentration monitored (µg/m3) 25.8 25.7 30.2 Number of samples exceeding state standard 50 µg/m3 21 40 31 Number of samples exceeding federal standard 150 µg/m3 0 0 0 FINE PARTICULATE MATTER (PM2.5)
Maximum 24-hour concentration monitored (µg/m3) 44.3 54.9 61.4 Annual average concentration monitored (µg/m3) 11.7 12.0 12.8 Number of samples exceeding federal standard 35 µg/m3 2 6 6 Source: California Air Resources Board, “Air Quality Data Statistics,” http://www.arb.ca.gov/adam/. 2019.

NA = not available
1 Parts by volume per million of air (ppm), micrograms per cubic meter of air (µg/m3), or annual arithmetic mean (aam). 2 The 8-hour federal O3 standard was revised from 0.075 ppm to 0.070 ppm in 2015. The statistics shown are based on the 2015 standard of

0.070 ppm.

The attainment status for the SCAB region is included in Table 4, Attainment Status of Criteria Pollutants in the South Coast Air Basin. Areas that meet ambient air quality standards are classified as attainment areas, while areas that do not meet these standards are classified as nonattainment areas. The SCAB region is designated as a nonattainment area for federal ozone, PM2.5, and lead standards and are designated as nonattainment for state ozone, PM10, and PM2.5 standards.

Impact Sciences, Inc. 7 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
Table 4
Attainment Status of the South Coast Air Basin (SCAB)
Pollutant State Federal
Ozone (O3) Non-Attainment Non-Attainment
Particulate Matter (PM10) Non-Attainment Attainment
Particulate Matter (PM2.5) Non-Attainment Non-Attainment Carbon Monoxide (CO) Attainment Attainment
Nitrogen Dioxide (NO2) Attainment Attainment
Sulfur Dioxide (SO2) Attainment Attainment
Lead Attainment Non-Attainment (Partial)1
Source: SCAQMD. 2016. National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (CAAQS) Attainment Status for South Coast Air Basin.
1 The Los Angeles County portion of the Basin is designated as a non-attainment area for the federal lead standard on the basis of source-specific monitoring at two locations as determined by U.S. EPA using 2007-2009 data. However, all stations in the Basin, including the near-source monitoring in Los Angeles County, have remained below the lead NAAQS for the 2012 through 2015 period. The SCAQMD will request that the U.S. EPA re-designated the Los Angeles County portion of the Basin as attainment for lead.

Toxic Air Contaminants
In addition to the criteria pollutants discussed above, toxic air contaminants (TACs) are another group of pollutants of concern. TACs are considered either carcinogenic or noncarcinogenic based on the nature of the health effects associated with exposure to the pollutant. For regulatory purposes, carcinogenic TACs are assumed to have no safe threshold below which health impacts would not occur, and cancer risk is expressed as excess cancer cases per one million exposed individuals. Noncarcinogenic TACs differ in that there is generally assumed to be a safe level of exposure below which no negative health impact is believed to occur. These levels are determined on a pollutant-by-pollutant basis.

There are many different types of TACs, with varying degrees of toxicity. Sources of TACs include industrial processes, such as petroleum refining and chrome-plating operations; commercial operations, such as gasoline stations and dry cleaners; and motor vehicle exhaust. Public exposure to TACs can result from emissions from normal operations, as well as from accidental releases of hazardous materials during upset conditions. The health effects associated with TACs are quite diverse and generally are assessed locally, rather than regionally. TACs can cause long-term health effects such as cancer, birth defects, neurological damage, asthma, bronchitis, or genetic damage, or short-term acute affects such as eye watering, respiratory irritation (a cough), running nose, throat pain, and headaches.

To date, CARB has designated 244 compounds as TACs. Additionally, CARB has implemented control measures for a number of compounds that pose high risks and show potential for effective control. The majority of the estimated health risks from TACs can be attributed to a relatively few compounds.

Impact Sciences, Inc. 8 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
CARB identified diesel particulate matter (DPM) as a TAC. DPM differs from other TACs in that it is not a single substance but rather a complex mixture of hundreds of substances. Diesel exhaust is a complex mixture of particulates and gases produced when an engine burns diesel fuel. DPM is a concern because it causes lung cancer; many compounds found in diesel exhaust are carcinogenic. DPM includes the particlephase constituents in diesel exhaust. The chemical composition and particle sizes of DPM very between different engine types (heavy-duty, light-duty), engine operating conditions (idle, accelerate, decelerate), fuel formulations (high/low sulfur fuel), and the year of the engine. Some short-term (acute) effects of diesel exhaust include eye, nose, throat, and lung irritation, and diesel exhaust can cause coughs, headaches, lightheadedness, and nausea. DPM poses the greatest health risk among the TACs. Almost all diesel exhaust particle mass is 10 microns or less in diameter. Because of their extremely small size, these particles can be inhaled and eventually trapped in the bronchial and alveolar regions of the lung.

Sensitive Receptors
Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved. Sensitive population groups include children, the elderly, the acutely ill, and the chronically ill, especially those with cardiovascular diseases.

Residential areas are considered to be sensitive receptors to air pollutions because residents (including children and the elderly) tend to be at home for extended periods of time, resulting in sustained exposure to any pollutants present. Children are considered more susceptible to health effects of air pollution due to their immature immune systems and developing organs (OEHHA 2007). As such, schools are also considered sensitive receptors, as children are present for extended durations and engage in regular outdoor activities. Recreational land uses are considered moderately sensitive to air pollution. Although exposure periods are generally short, exercise places a high demand on respiratory functions, which can be impaired by air pollution. In addition, noticeable air pollution can detract from the enjoyment of recreation.

2.2 Regulatory Framework
Federal
Clean Air Act
The Clean Air Act (CAA) of 1970 and the CAA Amendments of 1971 required the U.S. Environmental Protection Agency (EPA) to establish NAAQS, with states retaining the option to adopt more stringent standards or to include other specific pollutants. On April 2, 2007, the Supreme Court found that carbon Impact Sciences, Inc. 9 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
dioxide is an air pollutant covered by the CAA; however, no NAAQS have been established for carbon dioxide.

These standards are the levels of air quality considered safe, with an adequate margin of safety, to protect the public health and welfare. They are designed to protect those “sensitive receptors” most susceptible to further respiratory distress such as asthmatics, the elderly, very young children, people already weakened by other disease or illness, and persons engaged in strenuous work or exercise. Healthy adults can tolerate occasional exposure to air pollutant concentrations considerably above these minimum standards before adverse effects are observed.

The EPA has classified air basins (or portions thereof) as being in attainment, nonattainment, or unclassified for each criteria air pollutant, based on whether or not the NAAQS have been achieved. If an area is designated unclassified, it is because inadequate air quality data were available as a basis for a nonattainment or attainment designations. Table 4 lists the federal attainment status of the SCAB for the criteria pollutants.

National Emissions Standards for Hazardous Air Pollutants Program Under federal law, 187 substances are currently listed as hazardous air pollutants (HAPs). Major sources of specific HAPs are subject to the requirements of the National Emissions Standards for Hazardous Air Pollutants (NESHAPS) program. The EPA is establishing regulatory schemes for specific source categories and requires implementation of the Maximum Achievable Control Technologies (MACT) for major sources of HAPs in each source category. State law has established the framework for California’s TAC identification and control program, which is generally more stringent than the federal program and is aimed at HAPs that are a problem is California. The state has formally identified 244 substances as TACs and is adopting appropriate control measures for each. Once adopted at the state level, each air district will be required to adopt a measure that is equally or more stringent.

National Ambient Air Quality Standards
The federal CAA required the U.S. EPA to establish NAAQS. The NAAQS set primary standards and secondary standards for specific air pollutants. Primary standards define limits for the intention of protecting public health, which include sensitive populations such as asthmatics, children, and the elderly.

Secondary Standards define limits to protect public welfare to include protection against decreased visibility, damage to animals, crops, vegetation, and buildings. A summary of the federal ambient air quality standards is shown in Table 5, National Ambient Air Quality Standards.

Impact Sciences, Inc. 10 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
Table 5
National Ambient Air Quality Standards
Pollutant Primary/Secondary Averaging Time Level
Carbon Monoxide Primary 8 hours 9 ppm
1 hour 35 ppm
Lead Primary and secondary Rolling 3-month average 0.15 µg/m3 Nitrogen dioxide Primary 1 hour 100 ppb
Primary and secondary Annual 0.053 ppm
Ozone Primary and secondary 8 hours 0.070 ppm
Particulate
Matter
PM2.5 Primary Annual 12 µg/m3
Secondary Annual 15 µg/m3
Primary and secondary 24 hours 35 µg/m3
PM10 Primary and secondary 24 hours 150 µg/m3
Sulfur dioxide Primary 1 hour 75 ppb
Secondary 3 hours 0.5 ppm
Source:

California Air Resources Board. May 2016. Ambient Air Quality Standards. Available online at:
https://www.arb.ca.gov/research/aaqs/aaqs2.pdf, accessed November 16, 2018.

State
California Clean Air Act of 1988
The California CAA of 1988 (CCAA) allows states to adopt ambient air quality standards and other regulations provided that they are at least as stringent as federal standards. The California Air Resources Board (CARB), a part of the California Environmental Protection Agency (Cal EPA), is responsible for the coordination and administration of both federal and state air pollution control programs within California, including setting the CAAQS. The CCAA, amended in 1992, requires all air quality management districts (AQMDs) in the state to achieve and maintain the CAAQS. The CAAQS are generally stricter than national standards for the same pollutants and has also established state standards for sulfates, hydrogen sulfide, vinyl chloride, and visibility-reducing particles, for which there are no national standards. CARB also conducts research, compiles emission inventories, develops suggested control measures, and provides oversight of local programs. CARB also has primary responsibility for the development of California’s State Implementation Plan (SIP), for which it works closely with the federal government and the local air districts.

Impact Sciences, Inc. 11 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
California Ambient Air Quality Standards
The federal CAA permits states to adopt additional or more protective air quality standards if needed.

California has set standards for certain pollutants, such as particulate matter and ozone, which are more protective of public health than respective federal standards. California has also set standards for some pollutants that are not addressed by federal standards. The state standards for ambient air quality are summarized in Table 6, California Ambient Air Quality Standards.

Table 6
California Ambient Air Quality Standards
Pollutant Averaging Time Level
Carbon monoxide 8 hours 9 ppm
1 hour 20 ppm
Lead 30-day average 1.5 µg/m3
Nitrogen dioxide 1 hour 0.180 ppm
Annual 0.030 ppm
Ozone 8 hours 0.070 ppm
1 hour 0.09 ppm
Particulate
matter
PM2.5 Annual 12 µg/m3
PM10 24 hours 50 µg/m3
Annual 20 µg/m3
Sulfur dioxide 1 hour 0.25 ppm
24 hours 0.04 ppm
Sulfates 24 hours 25 µg/m3
Hydrogen sulfide 1 hour 0.03 ppm
Vinyl chloride 24 hours 0.01 ppm
Source:

California Air Resources Board. 2016. Ambient Air Quality Standards. May. Available online at:
https://www.arb.ca.gov/research/aaqs/aaqs2.pdf, accessed November 16, 2018.

California State Implementation Plan
The federal CAA (and its subsequent amendments) requires each state to prepare an air quality control plan referred to as a SIP. The SIP is a living document that is periodically modified to reflect the latest emissions inventories, plans, and rules and regulations of air basins as reported by the agencies with jurisdiction over them. The CAA Amendments dictate that states containing areas violating the NAAQS revise their SIPs to include extra control measures to reduce air pollution. The SIP includes strategies and control measures to attain the NAAQS by deadlines established by the CAA. The EPA has the responsibility to review all SIPs to determine if they conform to the requirements of the CAA.

Impact Sciences, Inc. 12 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
State law makes CARB the lead agency for all purposes related to the SIP. Local air districts and other agencies prepare SIP elements and submit them to CARB for review and approval. CARB then forwards SIP revisions to the EPA for approval and publication in the Federal Register. The 2016 Air Quality Management Plan (2016 AQMP) is the SIP for SCAB. The 2016 AQMP is a regional blueprint for achieving air quality standards and healthful air in the SCAB and those portions of the Salton Sea Air Basin (SSAB) that are under the SCAQMD’s jurisdictions. The 2016 AQMP represents a new approach, focusing on available, proven, and cost effective alternatives to traditional strategies, while seeking to achieve multiple goals in partnerships with other entities promoting reductions in greenhouse gases and toxic risk, as well as efficiencies in energy use, transportation, and goods movement. The most effective way to reduce air pollution impacts is to reduce emissions from mobile sources. The AQMP relies on regional and multi-level partnerships of governmental agencies at the federal, state, regional, and local level. Those agencies (EPA, CARB, local governments, Southern California Association of Governments [SCAG] and the SCAQMD) are the primary agencies that implement the AQMP programs. The 2016 AQMP incorporates the latest scientific and technical information and planning assumptions, including SCAG’s 2016-2035 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), updated emission inventory methodologies for various source categories, and SCAG’s latest growth forecasts. The 2016 AQMP includes integrated strategies and measures to meet the NAAQS.

California Air Toxics “Hot Spots” Information and Assessment Act (AB 2588) The California Air Toxics Program is supplemented by the Air Toxics “Hot Spots” program, which became law (AB 2588, Statutes of 1987) in 1987. In 1992, the AB 2588 program was amended by Senate Bill 1731 to require facilities that pose a significant health risk to the community to perform a risk reduction audit and reduce their emissions through implementation of a risk management plan. Under this program, which is required under the Air Toxics “Hot Spots” Information and Assessment Act (Section 44363 of the California Health and Safety Code), facilities are required to report their air toxics emissions, assess health risks, and notify nearby residents and workers of significant risks when present.

Typically, land development projects generate diesel emissions from construction vehicles during the construction phase, as well as some diesel emissions from small trucks during the operational phase. Diesel exhaust is mainly composed of particulate matter and gases, which contain potential cancer-causing substances. Emissions from diesel engines currently include over 40 substances that are listed by EPA as hazardous air pollutants and by CARB as TACs. On August 27, 1998, CARB identified particulate matter in diesel exhaust as a TAC, based on data linking diesel particulate emissions to increased risks of lung cancer and respiratory disease.

Impact Sciences, Inc. 13 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
In March 2015, the OEHHA adopted “The Air Toxics Hot Spots Program Guidance Manual for Preparation of Health Risk Assessments” in accordance with the Health and Safety Code, Section 44300. The Final Guidance Manual incorporates the scientific basis from three earlier developed Technical Support Documents to assess risk from exposure to facility emissions. The 2015 OEHHA Final Guidance has key changes including greater age sensitivity in particular for children, decreased exposure durations, and higher breathing rate profiles. Because cancer risk could be up to three times greater using this new guidance, it may result in greater mitigation requirements, more agency backlog, and increased difficulty in getting air permits. Regardless of the change in calculation methodology, actual emissions and cancer risk within South Coast Air Basin has declined by more than 50 percent since 2005.

The CARB provides a computer program, the Hot Spots Analysis and Reporting Program (HARP), to assist in a coherent and consistent preparation of an HRA. HARP2, an update to HARP, was released in March 2015. HARP2 has a more refined risk characterization in HRA and CEQA documents and incorporates the 2015 OEHHA Final Guidance.

Regional
South Coast Air Quality Management District
The SCAQMD is the air pollution control district for Orange County and the non-desert portions of Los Angeles, Riverside, and San Bernardino Counties. The agency’s primary responsibility is ensuring that the SCAB region meets attainment for the federal and state standards. The SCAQMD is responsible for preparing an air quality management plan in order to meet federal attainment status. The SCAQMD is also responsible for adopting and enforcing rules and regulations concerning air pollutant sources, issuing permits for stationary sources of air pollutants, inspecting stationary sources of air pollutants, responding to citizen complaints, monitoring ambient air quality and meteorological conditions, awarding grants to reduce motor vehicle emissions, and conducting public education campaigns, as well as many other activities. All projects are subject to SCAQMD rules and regulations in effect at the time of construction.

SCAQMD Rules and Regulations
The following is a list of noteworthy SCAQMD rules that are required of construction activities associated with the proposed project:
• Rule 402 (Nuisance) – This rule prohibits the discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or which endanger the comfort, repose, health, or safety of any such persons or the public, or which cause, or have a natural Impact Sciences, Inc. 14 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
tendency to cause, injury or damage to business or property. This rule does not apply to odors emanating from agricultural operations necessary for the growing of crops or the raising of fowl or animals.
• Rule 403 (Fugitive Dust) – This rule requires fugitive dust sources to implement best available control measures for all sources, and all forms of visible particulate matter are prohibited from crossing any property line. This rule is intended to reduce PM10 emissions from any transportation, handling, construction, or storage activity that has the potential to generate fugitive dust. PM10 suppression techniques are summarized blow.
a) Portions of a construction site to remain inactive longer than a period of three months will be seeded and watered until grass cover is grown or otherwise stabilized. b) All on-site roads will be paved as soon as feasible or watered periodically or chemically stabilized.
c) All material transported off-site will be either sufficiently watered or securely covered to prevent excessive amounts of dust.
d) The area disturbed by clearing, grading, earthmoving, or excavation operations will be minimized at all times.
e) Where vehicles leave a construction site and enter adjacent public streets, the streets will be swept daily or washed down at the end of the work day to remove soil tracked onto the paved surface.
• Rule 1113 (Architectural Coatings) – This rule requires manufacturers, distributors, and end-uses of architectural and industrial maintenance coatings to reduce ROG emissions from the use of these coatings, primarily by placing limits on the ROG content of various coating categories.

2.3 Impacts and Mitigation Measures
Thresholds of Significance
The impact analysis provided below is based on the application of the California Environmental Quality Act (CEQA) Guidelines Appendix G, which indicates that a project would have a significant impact on air quality if it would:
1) Conflict with or obstruct implementation of any applicable air quality plan.

Impact Sciences, Inc. 15 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
2) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or state ambient air quality standard. 3) Expose sensitive receptors to substantial pollutant concentrations. 4) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.

The significance criteria established by the applicable air quality management or air pollution control district (SCAQMD) may be relied upon to make the above determinations. According to the SCAQMD, an air quality impact is considered significant if the proposed project would violate any ambient air quality standard, contribute substantially to an existing or projected air quality violation, or expose sensitive receptors to substantial pollutant concentrations. The SCAQMD has established thresholds of significance for air quality for construction and operational activities of land use development projects, shown in Table 7 – South Coast Air Quality Management District Regional Significance Thresholds – Pounds per Day.

Table 7
South Coast Air Quality Management District Regional Significance Thresholds – Pounds per Day Mass Daily Thresholds a
Pollutant Construction b Operation c
NOx 100 lbs/day 55 lbs/day
VOC 75 lbs/day 55 lbs/day
PM10 150 lbs/day 150 lbs/day
PM2.5 55 lbs/day 55 lbs/day
SOx 150 lbs/day 150 lbs/day
CO 550 lbs/day 550 lbs/day
Lead 3 lbs/day 3 lbs/day
Toxic Air Contaminants (TACs), Odor, and GHG Thresholds TACs
(including carcinogens and noncarcinogens)
Maximum Incremental Cancer Risk ≥ 10 in 1 million
Cancer Burden > 0.5 excess cancer cases (in areas ≥ 1 in 1 million) Chronic & Acute Hazard Index ≥ 1.0 (project increment)
Odor Project creates an odor nuisance pursuant to South Coast AQMD Rule 402 GHG 10,000 MT/yr CO2eq for industrial facilities
Ambient Air Quality Standards for Criteria Pollutants d NO2
1-hour average
annual arithmetic mean
South coast AQMD is in attainment; project is significant if it causes or contributes to an exceedance of the following attainment standards:

0.18 ppm (state)

0.03 ppm (state) and 0.0534 ppm (federal)
PM10
24-hour average
annual average

10.4 µg/m3 (construction) e & 2.5 µg/m3 (operation)

1.0 µg/m3
Impact Sciences, Inc. 16 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
PM2.5
24-hour average 10.4 µg/m3 (construction) e & 2.5 µg/m3 (operation) SO2
1-hour average
24-hour average

0.25 ppm (state) & 0.075 ppm (federal - 99th percentile)

0.04 ppm (state)
Sulfate
24-hour average 25 µg/m3 (state)
CO
1-hour average
8-hour average
South Coast AQMD is in attainment; project is significant if it causes or contributes to an exceedance of the following attainment standards:
20 ppm (state) and 35 ppm (federal)

9.0 ppm (state/federal)
Lead
30-day Average
Rolling 3-month average

1.5 µg/m3 (state)

0.15 µg/m3 (federal)
a SOURCE: South Coast AQMD CEQA Handbook (South Coast AQMD, 1993) b Construction thresholds apply to both the South Coast Air Basin and Coachella Valley (Salton Sea and Mojave Desert Air Basins). c For Coachella Valley, the mass daily thresholds for operation are the same as the construction thresholds. d Ambient air quality thresholds for criteria pollutants based on South Coast AQMD Rule 1303, Table A-2 unless otherwise stated. e Ambient air quality threshold based on South Coast AQMD Rule 403.

CO Hotspot Analysis
In addition to the daily thresholds listed above, development associated with the proposed project would also be subject to the ambient air quality standards. These are addressed through an analysis of localized CO impacts. The California 1-hour and 8-hour CO standards are:
• 1-hour = 20 parts per million
• 8-hour = 9 parts per million
The significance of localized impacts depends on whether ambient CO levels in the vicinity of the project site are above state and federal CO standards. Carbon monoxide concentrations in Pasadena no longer exceed either the CAAQS or the NAAQS criteria. Additionally, the SCAB region is designated as attainment under the 1-hour and 8-hour standards (see Table 4).

Localized Significance Thresholds
In addition to regional emissions and the CO hotspot analysis, the SCAQMD has developed a set of mass emissions rate look-up tables called localized significance thresholds (LSTs) that can be used to evaluate localized impacts that may result from construction and operational-period emissions. If the on-site emissions from proposed construction activities are below the emission levels found in the LST mass rate look-up tables for the project site receptor area (SRA), then emissions would not have the potential to cause a significant localized air quality impact. When quantifying mass emissions for LST analysis, only Impact Sciences, Inc. 17 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
emissions that occur on site are considered. Consistent with SCAQMD LST guidance, emissions from offsite delivery hauling trucks, or employee trips are not considered in the evaluation of localized impacts.

The City of Pasadena lies within SCAQMD SRA 8 and the project site is approximately 0.74-acres.

Therefore, Table 8, Local Significance Thresholds – Pounds per Day shows the LST screening threshold for a 1-acre project site in SRA 8 with sensitive receptors located within 25 meters of the project site.

Table 8
Local Significance Thresholds – Pounds per Day
Phase Nitrogen Oxide
(NOx)
Carbon
Monoxide (CO)
Coarse Particulate
Matter (PM10)
Fine Particulate
Matter (PM2.5)
Construction 69 535 4 3
Operation 69 535 1 1
Source:

SCAQMD. 2009. Appendix C Mass Rate Look Up Table. Available at: http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/localized-significance-thresholds/appendix-c-mass-rate-lst-look-up-tables.pdf?sfvrsn=2.

Toxic Air Contaminant Thresholds
Certain groups of people are more affected by air pollution than others. The California Air Resources Board (CARB) has identified the following persons who are most likely to be affected by air pollution: children under 14, the elderly over 65, athletes, and people with cardiovascular and chronic respiratory diseases.

These groups are classified as sensitive receptors. Locations that may contain a high concentration of these sensitive population groups include residential areas, hospitals, daycare facilities, elder care facilities, elementary schools, and parks. The closest sensitive receptors to the site are residences located adjacent to the Project. However, due to the limited scale and the short duration of construction, the proposed Project would not expose sensitive receptors to substantial pollutant concentrations during construction.

Additionally, the proposed Project would not include any operational sources of TACs, and operational emissions were estimated to be far below significance thresholds. Therefore, the proposed Project would not expose sensitive receptors to a potential health risk during operation.

Methodology
Air quality impacts were evaluated in accordance with the methodologies recommended by CARB and the SCAQMD. Where criteria air pollutant quantification was required, emissions modeled using the California Emissions Estimator Model version 2016.3.2 (CalEEMod). CalEEMod is a statewide land use Impact Sciences, Inc. 18 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
emissions computer model designed to quantify potential criteria pollutant emissions associated with both construction and operations from a variety of land use projects.

Project Impacts and Mitigation Measures
Conflict with the 2016 Air Quality Management Plan
Impact 1 Implementation of the proposed project would not conflict with or obstruct implementation of the 2016 Air Quality Management Plan. Therefore, the project would cause no impact related to conflicts with the Air Quality Management Plan.

As part of its enforcement responsibilities, the EPA requires each state with nonattainment areas to prepare and submit a State Implementation Plan (SIP) that demonstrates the means to attain the federal standards.

The SIP must integrate federal, state, and local plan components and regulations to identify specific measures to reduce pollution in nonattainment areas, using a combination of performance standards and market-based programs. Similarly, under state law, the CCAA requires an air quality attainment plan to be prepared for areas designated as nonattainment with regard to the federal and state ambient air quality standards. Air quality attainment plans outline emissions limits and control measures to achieve and maintain these standards by the earliest practical date.

As previously mentioned, the project site is located within the SCAB, which is under the jurisdiction of the SCAQMD. The SCAQMD is required, pursuant to the federal Clean Air Act, to reduce emissions of criteria pollutants for which the SCAB is in nonattainment. In order to reduce such emissions, the SCAQMD drafted the 2016 Air Quality Management Plan (AQMP). The 2016 AQMP establishes a program of rules and regulations directed at reducing air pollutant emissions and achieving California and national air quality standards. The 2016 AQMP is a regional and multi-agency effort including the SCAQMD, CARB, SCAG, and the U.S. EPA. The plan’s pollutant control strategies are based on the latest scientific and technical information and planning assumptions, including SCAG’s 2016 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), updated emission inventory methodologies for various source categories, and SCAG’s latest growth forecasts. (SCAG’s latest growth forecasts were defined in consultation with local governments and with reference to local general plans.) The project is subject to the SCAQMD’s AQMP.

Criteria for determining consistency with the AQMP are defined in Chapter 12, Section 12.2 and Section

12.3 of the SCAQMD’s 1993 CEQA Air Quality Handbook, and include the following:
• Consistency Criterion No. 1: The proposed project will not result in an increase in the frequency or severity of an existing air quality violation, or cause or contribute to new violations, or delay the Impact Sciences, Inc. 19 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
timely attainment of air quality standards or the interim emissions reductions specified in the AQMP.
• Consistency Criterion No. 2: The proposed project will not exceed the assumptions in the AQMP or increments based on the years of the project build-out phase.

The violations to which Consistency Criterion No. 1 refers are the CAAQS and the NAAQS. As evaluated under Impacts 2 and 3 below, the project would not exceed the short-term construction standards or longterm operational standards and in so doing would not violate any air quality standards (see Table 9 and Table 10). Thus, no impact is expected, and the project would be consistent with first criterion.

Concerning Consistency Criterion No. 2, the 2016 AQMP contains air pollutant reduction strategies based on SCAG’s latest growth forecasts, and SCAG’s growth forecasts were defined in consultation with local governments and with reference to local general plans. The proposed project is consistent with the land use designation and development density prepared in the City of Pasadena’s General Plan and therefore would not exceed the population or job growth projections used by the SCAMQD to develop the 2016 AQMP. Thus, no impact would occur, as the project is also consistent with the second criterion.

Short-Term Construction-Generated and Long-Term Operation-Generated Pollutant Emissions Resulting in Violation of Air Quality Standards or Contributing to Existing Violations Impact 2 Project-generated construction and operational emissions would not exceed applicable significance thresholds and therefore would not contribute to regional nonattainment conditions. As a result, the project’s short-term construction and long-term operational emissions of air pollutants are considered a less than significant impact.

Regional Construction Significance Analysis
Construction associated with the proposed project would generate short-term emissions of criteria air pollutants. The criteria pollutants of primary concern within the project area include ozone-precursor pollutants (i.e., ROG and NOx), PM10, and PM2.5. Construction-generated emissions are short term and of temporary duration, lasting only as long as construction activities occur, but would be considered a significant air quality impact if the volume of pollutants generated exceeds the SCAQMD’s thresholds of significance.

Construction results in the temporary generation of emissions resulting from site grading and excavation, road paving, motor vehicle exhaust associated with construction equipment and worker trips, and the Impact Sciences, Inc. 20 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
movement of construction equipment, especially on unpaved surfaces. Emissions of airborne particulate matter are largely dependent on the amount of ground disturbance associated with site preparation activities as well as weather conditions and the appropriate application of water.

The duration of construction activities associated with the proposed project is estimated to last approximately 28 months, beginning in 2022. Construction-generated emissions associated with the proposed project were calculated using the SCAQMD and CARB-approved California Emissions Estimator Model (CalEEMod) model. CalEEMod is designed to model construction and operational emissions for land use development projects. The model incorporates typical construction requirements such as construction equipment, demolition debris, and hauling trips. The CalEEMod model assumed that construction of the proposed project would include approximately 45,500 cubic yards of grading soil export and construction equipment was based on information provided by the project applicant, including the use of Tier 3 construction equipment. Predicted maximum daily construction-generated emissions for the proposed project are summarized in Table 9, Construction-Related Criteria Pollutant and Precursor Emissions – Maximum Pounds per Day.

During construction, the contractors are required to comply with SCAQMD Rule 402 (Nuisance) and Rule 403 (Fugitive Dust), among others, which assist in reducing short-term construction-related air pollutant emissions. Rule 402 prohibits emissions that would cause a public nuisance and Rule 403 requires fugitive dust sources to implement best available control measures for all sources, and all forms of visible particulate matter are prohibited from crossing any property line. As shown below, all criteria pollutant emissions would remain below their respective thresholds. The proposed project would be subject to Rules 402, 403, and 113, described in the Regulatory Framework subsection above. In addition, the project would utilize Tier 3 construction equipment (or better) which would reduce NOx and particulate matter.

Table 9
Construction-Related Criteria Pollutant and Precursor Emissions – Maximum Pounds per Day Construction Year ROG NOx CO SO2 PM10 PM2.5
2022 3.3 60.1 68.7 0.2 4.6 3.3
2023 1.3 20.3 26.7 0.1 2.2 1.5
2024 15.1 21.6 28.9 0.1 2.5 1.6
Regional Threshold 75 100 550 150 150 55
Exceed? No No No No No No
Source: Impact Sciences, CalEEMod modeling, 2020. See Appendix A.

The emissions include measures within CalEEMod and as required by the SCAQMD through Rule 403. This includes the following: properly maintain mobile and other construction equipment; replace ground cover in disturbed areas quickly; water exposed surfaces three times daily; cover stock piles with tarps; water all haul roads twice daily; and limit speeds on unpaved roads to 15 miles per hours. Reductions percentages from the SCAQMD Impact Sciences, Inc. 21 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
CEQA Handbook (Tables XI-A through XI-E) were applied. Consistent with CARB fleet requirements, construction equipment was assumed to meet minimum Tier 3 standards.

Regional Operational Significance Analysis
Project-generated emissions would be associated with motor vehicle use and area sources, such as the use of natural-gas-fired appliances, landscape maintenance equipment, and architectural coatings associated with the operation of an 84-unit apartment building with 6,200 square feet of retail space and 4 work/live units. Long-term operational emissions attributable to the proposed project are summarized in Table 10, Long-Term Operational Emissions – Maximum Pounds per Day.

Table 10
Long-Term Operational Emissions – Maximum Pounds per Day Source ROG NOx CO SO2 PM10 PM2.5
Area Source 24.2 1.8 49.7 0.11 6.5 6.46
Energy Use 0.03 0.24 0.10 .002 0.02 0.02
Mobile Source 1.23 5.3 15.5 0.06 5.4 1.49
Total 25.5 7.4 65.3 0.17 11.92 7.96
Regional Threshold 75 100 550 150 150 55
Exceed? No No No No No No
Source: Impact Sciences, CalEEMod modeling, 2020. See Appendix A.

As shown in Table 9 and Table 10, neither the project’s construction nor operational emissions would exceed the SCAQMD’s thresholds for any criteria air pollutants. Therefore, regional construction and operation operational emissions would not result in a significant long-term regional air quality impact.

Adverse health effects induced by criteria pollutant emissions are highly dependent on a multitude of interconnected variables (e.g., cumulative concentrations, local meteorology and atmospheric conditions, and the number and character of exposed individual [e.g., age, gender]). In particular, O3 precursors, VOCs, and NOx affect air quality on a regional scale. Health effects related to O3 are therefore the product of emissions generated by numerous sources throughout a region. Existing models have limited sensitivity to small changes in criteria pollutant concentrations, and, as such, translating project-generated criteria pollutants to specific health effects or additional days of nonattainment would produce meaningless results. In other words, the project’s less than significant increases in regional air pollution from criteria air Impact Sciences, Inc. 22 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
pollutants would not have measurable effect on the human health implications of the Basin’s ambient air quality.

As noted in the Brief of Amicus Curiae by the SCAQMD (April 6, 2015) for the Sierra Club vs. County of Fresno, the SCAMQD acknowledged it would be extremely difficult, if not impossible to quantify health impact of criteria pollutants for various reasons including modeling limitations as well as where in the atmosphere air pollutants interact and form. Further, as noted in the Brief of Amicus Curiae by the San Joaquin Valley Air Pollution Control District (SJVAPCD) (April 13, 2015) for the Sierra Club vs. County of Fresno, SJVAPCD has acknowledged that currently available modeling tools are not equipped to provide a meaningful analysis of the correlation between an individual development project’s air emissions and specific human health impacts.

The SCAQMD acknowledges that quantifying the health impacts from O3 is difficult. The health impacts an individual may face from O3 depends on the ambient levels of O3 that an individual person breathes.

However, measuring changes in ambient levels of O3 presents a challenge. SCAQMD’s Brief of Amicus Curiae states that it would take a large amount of additional emissions to cause a modeled increase in ambient O3 levels over the entire region. The SCAQMD states that based on their own modeling in the SCAQMD’s 2012 Air Quality Management Plan, a reduction of 432 tons (864,000 pounds) per day of NOx and a reduction of 187 tons (374,000 pounds) per day of VOC would reduce O3 levels at the highest monitored site by only nine parts per billion. As such, the SCAQMD concludes that it is not currently possible to accurately quantify O3-related health impacts caused by NOx or VOC emissions from relatively small projects (defined as projects with regional scope) due to photochemistry and regional model limitations. Thus, as the project would not exceed SCAQMD thresholds for construction and operational air emissions, the project would have a less than significant impact for air quality health impacts.

Exposure of Sensitive Receptors to Substantial Pollutant Concentrations Impact 3 Implementation of the project would not expose sensitive receptors to substantial air pollutant concentrations. This is considered a less than significant impact.

Localized Significance Thresholds
Localized Construction Significance Analysis
The nearest receptors to the project site are residents located adjacent to the north and east of the project site. In order to identify impacts to sensitive receptors, the SCAQMD recommends addressing Localized Significance Thresholds (LSTs) for construction.

Impact Sciences, Inc. 23 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
LSTs were developed in response to SCAQMD Governing Boards’ Environmental Justice Enhancement Initiative (I-4). The SCAMQD provided the Final Localized Significance Threshold Methodology for guidance (SCAQMD 2008). The LST methodology assists lead agencies in analyzing localized impacts associated with project-specific analysis.

As detailed above, the SRA for the LST is the West San Gabriel Valley area (SRA 8) since this area includes the project site. LSTs apply to CO, NO2, PM10, and PM2.5. The SCAMQD produced look-up tables for projects that disturb areas less than or equal to 5 acres in size. The project site is approximately 0.74-acres, therefore, the LST threshold for one acre was utilized for the construction LST analysis.

The SCAQMD’s methodology clearly states that “off-site mobile emissions from the project should not be included in the emissions compared to LSTs.” Therefore, for purposes of the construction LST analysis, only emissions included in the CalEEMod “on-site” emissions outputs were considered. The nearest sensitive receptors to the project site are the residents adjacent to the north and east. LST screening thresholds are provided for distances to sensitive receptors of 25, 50, 100, 200, and 500 meters. According to SCAQMD methodology, “It is possible that a project may have receptors closer than 25 meters. Projects with boundaries located closer than 25 meters to the nearest receptor should use the LSTs for receptors located at 25 meters.” Therefore, LSTs for receptors located at 25 meters were utilized in this analysis.

Table 11, Localized Significance of Construction Emissions – Maximum Pounds per Day, presents the results of the localized emissions during construction activity of the proposed project. As shown in Table 10, the on-site air pollutant emissions on the peak day of construction would not exceed the applicable LST.

Therefore, impacts would be less than significant.

Table 11
Localized Significance of Construction Emissions – Maximum Pounds per Day Construction Year NOx CO PM10 PM2.5
2022 31.02 38.49 1.44 1.42
2023 18.48 23.20 0.95 0.95
2024 18.47 23.20 0.95 0.95
LST Screening Threshold 69 535 4 3
Exceed? No No No No
Localized Operational Significance Analysis
According to the SCAQMD LST methodology, LSTs would apply to operational phase of a proposed project only if the project includes stationary sources or attracts mobile sources that may spend long periods queuing and idling at the site (e.g., warehouse or transfer facilities). The project is proposing a mixed-use Impact Sciences, Inc. 24 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
residential and commercial development and, therefore, does not include such land uses. Thus, due to the lack of queuing and idling emissions, no long-term localized significance threshold analysis is needed.

Operational LST impacts would be less than significant in this regard.

Localized Air Quality Health Impacts
As evaluated above, the project’s air emissions would not exceed the SCAQMD’s LST thresholds.

Therefore, the project would not cause or contribute to an exceedance of the most stringent applicable NAAQS or CAAQS for emissions of CO, NOx, PM10, or PM2.5. It should be noted that the ambient air quality standards are developed and represent levels at which the most susceptible persons are protected.

In other words, the ambient air quality standards are purposely set in a stringent manner to protect children, the elderly, and those with existing respiratory problems. Thus, air quality health impacts would be less than significant in this regard.

Carbon Monoxide Hotspots
CO emissions are a function of vehicle idling time, meteorological conditions, and traffic flow. Under certain extreme meteorological conditions, CO concentrations near a congested roadways or intersections may reach unhealthful levels (i.e., adversely affecting residents, school children, hospital patients, the elderly, etc.).

The SCAB is designated as an attainment/maintenance area for the federal CO standards and an attainment area for state standards. There has been a decline in CO emissions even though vehicle miles traveled (VMT) on U.S. urban and rural roads have increased nationwide; estimated anthropogenic CO emissions have decreased 68 percent between 1990 and 2014. In 2014, mobile sources accounted for 82 percent of the nation’s total anthropogenic CO emissions (EPA 2018). Three major control programs have contributed to the reduced per-vehicle CO emissions: exhaust standards, cleaner burner fuels, and motor vehicle inspection/maintenance programs.

According to the SCAQMD CEQA Air Quality Handbook, a potential CO hotspot may occur at any location where the background CO concentration already exceeds 9.0 ppm, the CAAQS for 8-hour ozone. The SCAQMD prepared a detailed CO analysis in the Federal Attainment Plan for Carbon Monoxide as part of the 2003 AQMP. The 2003 AQMP is the most recent AQMP that addresses CO concentrations. The CO analysis included microscale modeling of CO at the worst-case intersections in SCAB. Of these locations, the Wilshire Boulevard and Veteran Avenue intersection in Los Angeles experienced the highest CO concentration of 4.6 ppm. At the time of analysis, the Wilshire Boulevard and Veteran Avenue intersection was the most congested intersection in Los Angeles County with an average daily traffic volume of approximately 100,000 vehicles per day. As CO impacts at the Wilshire Boulevard and Veteran Avenue Impact Sciences, Inc. 25 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
intersection did not exceed the 8-hour CAAQS, it can be inferred that the intersections near the project site would not create any CO hotspots. Furthermore, as previously discussed, the site is located in SRA 8, West San Gabriel Valley. Communities within SRAs are expected to have similar climatology and ambient air pollutant concentrations. The monitoring station representative of SRA 8 is the Pasadena-South Wilson Avenue air quality monitoring station located approximately 1.5 miles southeast of the site. According to data obtained from the EPA’s AirData database for CO pollutants, the highest eight-hour concentration reported for the Pasadena station in 2018 was 1.4 ppm. As such, the background CO concentration in combination with the CO concentration at worst-case scenario intersection in SCAB do not exceed 9.0 ppm and a CO hotspot would not occur. Therefore, CO hotspot impacts would be less than significant in this regard.

Diesel Particulate Matter
Construction would result in the generation of diesel particulate matter (diesel PM) emissions from the use of off-road diesel equipment required for grading and excavation, paving, and other construction activities.

The amount to which the receptors are exposed (a function of concentration and duration of exposure) is the primary factor used to determine health risk (i.e., potential exposure to TAC emission levels that exceed applicable standards). Health-related risks associated with diesel-exhaust emissions are primarily linked to long-term exposure and the associated risk of contracting cancer.

The use of diesel-powered construction equipment would be temporary and episodic. The duration of exposure would be short and exhaust from construction equipment dissipates rapidly. Current methodology for conducting health risk assessments are associated with long term exposure periods (9, 30, and 70 years). Therefore, short-term construction activities would not generate a significant health risk.

Additionally, the project site is approximately 0.74-acres and, as a result, construction activities would occur in an area of less than 5 acres. CARB generally considers construction projects contained in a site of such size to represent less than significant health risk impacts due to limitations of the off-road diesel equipment able to operate and thus a reduced amount of generated diesel particulate matter (DPM), the reduced amount of dust-generating ground-disturbance possible compared to larger construction sites, and the reduced duration of construction activities compared to the development of larger sites.

Furthermore, construction would be subject to and would comply with California regulations limiting the idling of heavy-duty construction equipment to no more than 5 minutes, which would further reduce nearby sensitive receptors’ exposure to temporary and variable DPM emissions. For these reasons, DPM generated by construction activities, in and of itself, would not be expected to expose sensitive receptors to substantial amounts of air toxics and the project would have a less than significant impact.

Impact Sciences, Inc. 26 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
Result in Other Emissions (Such as those Leading to Odors) Adversely Affecting a Substantial Number of People
Impact 4 The proposed project would not include sources that could create other emissions (such as those leading to odors) adversely affecting a substantial number of people. Thus, the project would cause a less than significant impact in this regard.

The SCAQMD CEQA Air Quality Handbook (1993) identifies certain land uses as sources of odors. These land uses include agriculture (farming and livestock), wastewater treatment plants, food processing plants, chemical plants, composting facilities, refineries, landfills, dairies, and fiberglass molding. The proposed project would not include any of the land uses that have been identified by the SCAQMD as odor sources.

Construction activities associated with the project may generate detectable odors from heavy-duty equipment exhaust and architectural coatings. However, construction-related odors would be short-term in nature and cease upon project completion. In addition, the project would be required to comply with the California Code of Regulations, Title 13, sections 2449(d)(3) and 2485, which minimizes the idling time of construction equipment either by shutting it off when not in use or by reducing the time of idling to no more than five minutes. This would reduce the detectable odors from heavy-duty equipment exhaust. The project would also be required to comply with the SCAQMD Rule 1113 – Architectural Coating, which would minimize odor impacts from ROG emissions during architectural coating. Any odor impacts to existing adjacent land uses would be short-term and not substantial. As such, the project would not result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.

Impacts would be less than significant in this regard.

2.4 Cumulative Setting, Impacts, and Mitigation Measures Cumulative Setting
The cumulative setting for air quality includes Pasadena and SCAB. SCAB is designated as nonattainment area for state standards of ozone, PM2.5, and PM10. SCAB is designated as a nonattainment area for federal standards of ozone and PM2.5. SCAB is designated as being unclassified and/or attainment for all other pollutants. Cumulative growth in population and vehicle use could inhibit efforts to improve regional air quality and attain the ambient air quality standards.

Impact Sciences, Inc. 27 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
Cumulative Impacts and Mitigation Measures
Result in a Cumulatively Considerable Net Increase in Nonattainment Criteria Pollutants Impact 5 Implementation of the proposed project would not result in a cumulatively considerable net increase of criteria air pollutants for which the SCAB is designated nonattainment. This is considered a less than cumulatively considerable impact.

The SCAQMD’s approach to assessing cumulative impacts is based on the 2016 AQMP forecasts of attainment of ambient air quality standards in accordance with the requirements of the CAA and the CCAA. The SCAQMD neither recommends quantified analyses of cumulative construction or operational emissions, nor does it provide separate methodologies or thresholds of significance to be used to assess cumulative construction or operational impacts. Instead, the SCAQMD recommends that a project’s potential contribution to cumulative impacts should be assessed using the same significance criteria as those for project-specific impacts. Therefore, individual development projects that generate constructionrelated or operational emissions that exceed the SCAQMD recommended daily thresholds for projectspecific impacts would also cause a cumulative considerable increase in emissions for those pollutants for which the Basin is nonattainment.

As discussed in Impact 1, the proposed project would be consistent with the 2016 AQMP, which is intended to bring the SCAB into attainment for all criteria pollutants. Furthermore, operational and construction emissions calculated for the proposed project do not exceed the applicable SCAQMD daily significance thresholds that are designed to assist the region in attaining the applicable ambient air quality standards (see Table 9, Construction-Related Criteria Pollutant and Precursor Emissions and Table 10, Long-Term Operational Emissions).

Additionally, with respect to the proposed project’s construction-related air quality emissions and cumulative basin-wide conditions, the SCAQMD has developed strategies to reduce criteria pollutant emissions outlined in the 2016 AQMP pursuant to federal CAA mandates. As such, the proposed project would comply with SCAQMD Rule 403 requirements and with adopted 2016 AQMP emissions control measures. Per SCAQMD rules and mandates, these same requirements (i.e., Rule 403 compliance and compliance with adopted AQMP emissions control measures) would also be imposed on construction projects throughout the SCAB, which would include related projects.

The proposed project would also not result in cumulative operational air quality impacts because emissions would not exceed the SCAQMD-adopted operational thresholds and the project’s contribution is not a significant proportion of the cumulative total emissions. Cumulative projects would likewise be required Impact Sciences, Inc. 28 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
to reduce their emissions per SCAQMD rules and mandates. The project’s emissions would not considerably contribute to an exceedance of the NAAQS or CAAQS and would, therefore, comply with the goals of the 2016 AQMP. Therefore, the project’s contribution to regional pollutant concentrations would not be cumulatively considerable and cumulative impacts would not be significant.

Impact Sciences, Inc. 29 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
References
U.S. Environmental Protection Agency. 2018. Monitor Values Report. Available:
https://www.epa.gov/outdoor-air-quality-data/monitor-values-report.

U.S. Environmental Protection Agency. Carbon Monoxide Emissions. Available:
https://cfpub.epa.gov/roe/indicator.cfm?i=10.

South Coast Air Quality Management District. 2005. Rule 403. Fugitive Dust. Available:
http://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-403.pdf.

South Coast Air Quality Management District. 2017. Final 2016 Air Quality Management Plan. Available:
http://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality-management-plans/2016-airquality-management-plan/final-2016-aqmp/final2016aqmp.pdf?sfvrsn=15.

South Coast Air Quality Management District. 2016. Rule 1113. Architectural Coatings. Available:
http://www.aqmd.gov/docs/default-source/rule-book/reg-xi/r1113.pdf?sfvrsn=24.

South Coast Air Quality Management District. 2008. Final Localized Significance Threshold Methodology.

Available: http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significancethresholds/final-lst-methodology-document.pdf?sfvrsn=2.

South Coast Air Quality Management District. 2009. Appendix C – Mass Rate LST Look-Up Tables. Available:
http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/appendix-cmass-rate-lst-look-up-tables.pdf?sfvrsn=2.

South Coast Air Quality Management District. 1993. CEQA Air Quality Handbook.

South Coast Air Quality Management District. 2014. Application of the South Coast Air Quality Management District for Leave to File of Amicus Curiae in Support of Neither Party and Brief of Amicus Curiae. In the Supreme Court of California. Sierra Clube, Revive the San Joaquin, and League of Women Voters of Fresno v. County of Fresno.

South Coast Air Quality Management District. 2017. Rule 1401. New Source Review of Toxic Air Contaminants.

Available: http://www.aqmd.gov/docs/default-source/rule-book/reg-xiv/rule-1401.pdf?sfvrsn=4.

South Coast Air Quality Management District. 2019. South Coast AQMD Air Quality Significance Thresholds.

Available: http://www.aqmd.gov/docs/default-source/ceqa/handbook/scaqmd-air-quality-significancethresholds.pdf?sfvrsn=2.

Impact Sciences, Inc. 30 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
South Coast Air Quality Management District. National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (CAAQS) Attainment Status for South Coast Air Basin. Available:
http://www.aqmd.gov/docs/default-source/clean-air-plans/air-quality-management-plans/naaqs-caaqsfeb2016.pdf.

South Coast Air Quality Management District. 2003. Final 2003 AQMP Appendix V Modeling and Attainment Demonstrations. Available: www.aqmd.gov/docs/default-source/clean-air-plans/air-quality-managementplans/2003-air-quality-management-plan/2003-aqmp-appendix-v.pdf?sfvrsn=2.

South Coast Air Quality Management District. 1976. Rule 402. Nuisance. Available:
http://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-402.pdf?sfvrsn=4.

California Air Resources Board. 2016. Ambient Air Quality Standards. Available online at:
https://ww3.arb.ca.gov/research/aaqs/aaqs2.pdf.

California Air Resources Board. Hotspots Analysis and Reporting Program (HARP). Accessed online at:
https://ww3.arb.ca.gov/toxics/harp/harp.htm.

California Air Resources Board. Air Quality Data Statistics. Available: http://www.arb.ca.gov/adam/.

Office of Environmental Health Hazard Assessment. 2015. Air Toxics Hot Spots Program Risk Assessment Guidelines. Available online at: https://oehha.ca.gov/media/downloads/crnr/2015guidancemanual.pdf, accessed December 18, 2019.

Impact Sciences, Inc. 31 86 Fair Oaks Ave. Project
1136.04 June 2020
#PZ270KS40D8ZTSv1
CalEEMod Output Files

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Enclosed Parking with Elevator 195.00 Space 0.00 78,000.00 0 Apartments Mid Rise 84.00 Dwelling Unit 0.74 84,000.00 240 Strip Mall 7.50 1000sqft 0.00 7,500.00 0

1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
12 Wind Speed (m/s) 2.2 Precipitation Freq (Days) 31

1.3 User Entered Comments & Non-Default Data

1.0 Project Characteristics
Utility Company Pasadena Water & Power
Operational Year 2024
CO2 Intensity
(lb/MWhr)
1664.14 CH4 Intensity 0.029
(lb/MWhr)
N2O Intensity 0.006
(lb/MWhr)
86 Fair Oaks
South Coast Air Basin, Annual
CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
Project Characteristics - CO2e intensity factor updated per SoCal Edison's 2018 Sustainability Report, see:
https://www.edison.com/content/dam/eix/documents/sustainability/eix-2018-sustainability-report.pdf Land Use - 4 work/live units (1,300 sf) included as a retail land use.

Construction Phase - Schedule per the Applicant's Construction Questionnaire.

Off-road Equipment - Construction equipment per the Applicant's Construction Questionnaire. Any hours changed based on Appendix D of CalEEMod Users Guide for a lot under 1 acre.

Off-road Equipment - Construction equipment per the Construction Questionnaire.

Off-road Equipment - From construction questionnaire.

Trips and VMT - haul route round trip = 26 miles
Demolition -
Grading - size of the project site
Construction Off-road Equipment Mitigation - Tier 3 equipment per the Construction Questionnaire. Soil stabilizers and ground cover reductions from SCAQMD CEQA Guidelines.

Mobile Land Use Mitigation - Project site near two Metro Gold Line stations.

Energy Mitigation -
Water Mitigation -
Waste Mitigation -
Off-road Equipment -
Energy Use -
Table Name Column Name Default Value New Value
tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 12 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 13.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
CalEEMod Version: CalEEMod.2016.3.2 Page 3 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
tblConstructionPhase NumDays 5.00 45.00
tblConstructionPhase NumDays 100.00 458.00
tblConstructionPhase NumDays 10.00 21.00
tblConstructionPhase NumDays 2.00 130.00
tblConstructionPhase PhaseEndDate 6/14/2022 3/1/2024
tblConstructionPhase PhaseEndDate 6/7/2022 3/1/2024
tblConstructionPhase PhaseEndDate 1/14/2022 1/31/2022
tblConstructionPhase PhaseEndDate 1/18/2022 8/1/2022
tblConstructionPhase PhaseStartDate 6/8/2022 1/1/2024
tblConstructionPhase PhaseStartDate 1/19/2022 6/1/2022
tblConstructionPhase PhaseStartDate 1/15/2022 2/1/2022
tblGrading AcresOfGrading 0.00 0.74
tblGrading MaterialExported 0.00 45,500.00
tblLandUse LotAcreage 1.75 0.00
tblLandUse LotAcreage 2.21 0.74
tblLandUse LotAcreage 0.17 0.00
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblOffRoadEquipment OffRoadEquipmentType Off-Highway Trucks tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Concrete/Industrial Saws tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Bore/Drill Rigs tblOffRoadEquipment OffRoadEquipmentType Off-Highway Trucks tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment CalEEMod Version: CalEEMod.2016.3.2 Page 4 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

2.0 Emissions Summary
tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Concrete/Industrial Saws tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment tblOffRoadEquipment OffRoadEquipmentType Paving Equipment tblOffRoadEquipment OffRoadEquipmentType Rollers
tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Surfacing Equipment tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblTripsAndVMT HaulingTripLength 20.00 13.00
tblTripsAndVMT HaulingTripLength 20.00 13.00
CalEEMod Version: CalEEMod.2016.3.2 Page 5 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

2.1 Overall Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2022 0.6732 6.6554 6.6216 0.0154 0.1596 0.2794 0.4390 0.0424 0.2593 0.3017 0.0000 1,370.462 7 1,370.462
7 0.3430 0.0000 1,379.037
0 2023 0.5091 4.7310 5.3396 0.0114 0.1558 0.2131 0.3688 0.0418 0.1977 0.2395 0.0000 1,005.640 3 1,005.640
3 0.2517 0.0000 1,011.9335
2024 0.3984 0.8000 0.9727 2.0700e0030.0317 0.0355 0.0671 8.4800e0030.0330 0.0415 0.0000 182.7857 182.7857 0.0439 0.0000 183.8832 Maximum 0.6732 6.6554 6.6216 0.0154 0.1596 0.2794 0.4390 0.0424 0.2593 0.3017 0.0000 1,370.462 7 1,370.462
7 0.3430 0.0000 1,379.037
0 Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
2022 0.2387 4.3534 5.0035 0.0154 0.1567 0.1774 0.3340 0.0420 0.1772 0.2192 0.0000 936.3437 936.3437 0.2056 0.0000 941.4826 2023 0.1685 2.6403 3.4485 0.0114 0.1558 0.1252 0.2810 0.0418 0.1251 0.1669 0.0000 608.2794 608.2794 0.1258 0.0000 611.4236 2024 0.3400 0.4879 0.6453 2.0700e0030.0317 0.0238 0.0555 8.4800e0030.0238 0.0323 0.0000 114.0135 114.0135 0.0221 0.0000 114.5661 Maximum 0.3400 4.3534 5.0035 0.0154 0.1567 0.1774 0.3340 0.0420 0.1772 0.2192 0.0000 936.3437 936.3437 0.2056 0.0000 941.4826 Mitigated Construction
CalEEMod Version: CalEEMod.2016.3.2 Page 6 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

52.73 38.61 29.66 0.00 0.83 38.18 23.36 0.45 33.43 28.18 0.00 35.18 35.18 44.66 0.00 35.24 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2022 3-31-2022 1.4984 1.0806
2 4-1-2022 6-30-2022 2.2776 1.5780
3 7-1-2022 9-30-2022 2.0919 1.1989
4 10-1-2022 12-31-2022 1.4601 0.7294
5 1-1-2023 3-31-2023 1.2960 0.6948
6 4-1-2023 6-30-2023 1.3086 0.7008
7 7-1-2023 9-30-2023 1.3230 0.7085
8 10-1-2023 12-31-2023 1.3248 0.7103
9 1-1-2024 3-31-2024 1.1607 0.8020
Highest 2.2776 1.5780
CalEEMod Version: CalEEMod.2016.3.2 Page 7 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.6679 0.0318 1.4025 1.4100e0030.0850 0.0850 0.0850 0.0850 8.9224 18.5658 27.4882 0.0280 6.1000e00428.3682 Energy 5.0400e0030.0431 0.0186 2.7000e0043.4800e0033.4800e0033.4800e0033.4800e0030.0000 728.3444 728.3444 0.0128 3.3600e003729.6653 Mobile 0.2001 0.9555 2.5896 0.0104 0.9285 7.5900e0030.9361 0.2488 7.0500e0030.2558 0.0000 961.9549 961.9549 0.0433 0.0000 963.0366 Waste 0.0000 0.0000 0.0000 0.0000 9.4431 0.0000 9.4431 0.5581 0.0000 23.3950 Water 0.0000 0.0000 0.0000 0.0000 1.9126 91.0436 92.9562 0.1980 4.9700e00399.3868 Total 0.8731 1.0304 4.0107 0.0121 0.9285 0.0961 1.0246 0.2488 0.0956 0.3443 20.2781 1,799.908 7 1,820.186
8 0.8401 8.9400e0031,843.851
8 Unmitigated Operational
CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Area 0.6679 0.0318 1.4025 1.4100e0030.0850 0.0850 0.0850 0.0850 8.9224 18.5658 27.4882 0.0280 6.1000e00428.3682 Energy 4.7900e0030.0410 0.0177 2.6000e0043.3100e0033.3100e0033.3100e0033.3100e0030.0000 695.4182 695.4182 0.0122 3.2100e003696.6786 Mobile 0.1869 0.8808 2.2508 8.8200e0030.7779 6.4900e0030.7844 0.2084 6.0300e0030.2145 0.0000 816.2253 816.2253 0.0376 0.0000 817.1651 Waste 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Water 0.0000 0.0000 0.0000 0.0000 1.9126 91.0436 92.9562 0.1980 4.9700e00399.3868 Total 0.8596 0.9536 3.6709 0.0105 0.7779 0.0948 0.8728 0.2084 0.0944 0.3028 10.8350 1,621.252 9 1,632.087
8 0.2758 8.7900e0031,641.598
7 Mitigated Operational

3.0 Construction Detail
Construction Phase
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

1.54 7.45 8.47 13.09 16.21 1.32 14.82 16.21 1.25 12.06 46.57 9.93 10.33 67.17 1.68 10.97 CalEEMod Version: CalEEMod.2016.3.2 Page 9 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Demolition Demolition 1/1/2022 1/31/2022 5 21
2 Grading Grading 2/1/2022 8/1/2022 5 130
3 Building Construction Building Construction 6/1/2022 3/1/2024 5 458 4 Architectural Coating Architectural Coating 1/1/2024 3/1/2024 5 45 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Grading Excavators 2 8.00 158 0.38
Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Grading Concrete/Industrial Saws 1 8.00 81 0.73
Demolition Excavators 1 8.00 158 0.38
Demolition Off-Highway Trucks 1 8.00 402 0.38
Demolition Other Construction Equipment 3 8.00 172 0.42 Demolition Rough Terrain Forklifts 1 8.00 100 0.40
Demolition Rubber Tired Loaders 1 8.00 203 0.36
Demolition Signal Boards 2 8.00 6 0.82
Building Construction Forklifts 0 6.00 89 0.20
Grading Bore/Drill Rigs 1 8.00 221 0.50
Grading Off-Highway Trucks 2 8.00 402 0.38
Residential Indoor: 170,100; Residential Outdoor: 56,700; Non-Residential Indoor: 11,250; Non-Residential Outdoor: 3,750; Striped Parking Area: 4,680 (Architectural Coating ±sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0.74
Acres of Paving: 0
CalEEMod Version: CalEEMod.2016.3.2 Page 10 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
Demolition Tractors/Loaders/Backhoes 1 6.00 97 0.37
Grading Other Construction Equipment 5 8.00 172 0.42
Grading Rough Terrain Forklifts 1 8.00 100 0.40
Grading Tractors/Loaders/Backhoes 1 6.00 97 0.37
Grading Rubber Tired Loaders 1 8.00 203 0.36
Grading Signal Boards 2 8.00 6 0.82
Building Construction Cranes 1 4.00 231 0.29
Demolition Rubber Tired Dozers 0 1.00 247 0.40
Grading Rubber Tired Dozers 0 1.00 247 0.40
Building Construction Concrete/Industrial Saws 1 8.00 81 0.73 Building Construction Other Construction Equipment 5 8.00 172 0.42 Building Construction Paving Equipment 1 7.00 132 0.36
Building Construction Rollers 1 7.00 80 0.38
Building Construction Rough Terrain Forklifts 1 6.00 100 0.40 Building Construction Rubber Tired Loaders 1 8.00 203 0.36 Building Construction Signal Boards 2 8.00 6 0.82
Building Construction Surfacing Equipment 2 8.00 263 0.30 Building Construction Tractors/Loaders/Backhoes 1 8.00 97 0.37 Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 11 28.00 0.00 12.00 14.70 6.90 13.00 LD_Mix HDT_Mix HHDT Grading 16 40.00 0.00 5,688.00 14.70 6.90 13.00 LD_Mix HDT_Mix HHDT Building Construction 16 96.00 23.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 19.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Page 11 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 1.3400e0030.0000 1.3400e0032.0000e0040.0000 2.0000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0300 0.2784 0.2986 5.9000e0040.0129 0.0129 0.0120 0.0120 0.0000 51.7292 51.7292 0.0150 0.0000 52.1043 Total 0.0300 0.2784 0.2986 5.9000e0041.3400e0030.0129 0.0142 2.0000e0040.0120 0.0122 0.0000 51.7292 51.7292 0.0150 0.0000 52.1043 Unmitigated Construction On-Site

3.1 Mitigation Measures Construction
Use Alternative Fuel for Construction Equipment
Use Cleaner Engines for Construction Equipment
Use Soil Stabilizer
Replace Ground Cover
Water Exposed Area
Water Unpaved Roads
Reduce Vehicle Speed on Unpaved Roads
CalEEMod Version: CalEEMod.2016.3.2 Page 12 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 3.0000e0051.1500e0032.5000e0040.0000 7.0000e0050.0000 7.0000e0052.0000e0050.0000 2.0000e0050.0000 0.3091 0.3091 2.0000e0050.0000 0.3097 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.1500e0038.2000e0049.4700e0033.0000e0053.2300e0032.0000e0053.2500e0038.6000e0042.0000e0058.8000e0040.0000 2.7118 2.7118 7.0000e0050.0000 2.7135 Total 1.1800e0031.9700e0039.7200e0033.0000e0053.3000e0032.0000e0053.3200e0038.8000e0042.0000e0059.0000e0040.0000 3.0209 3.0209 9.0000e0050.0000 3.0232 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 4.4000e0040.0000 4.4000e0047.0000e0050.0000 7.0000e0050.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.1500e0030.1868 0.2363 5.9000e0049.4100e0039.4100e0039.4100e0039.4100e0030.0000 33.6916 33.6916 9.3800e0030.0000 33.9260 Total 9.1500e0030.1868 0.2363 5.9000e0044.4000e0049.4100e0039.8500e0037.0000e0059.4100e0039.4800e0030.0000 33.6916 33.6916 9.3800e0030.0000 33.9260 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 13 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 3.0000e0051.1500e0032.5000e0040.0000 7.0000e0050.0000 7.0000e0052.0000e0050.0000 2.0000e0050.0000 0.3091 0.3091 2.0000e0050.0000 0.3097 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.1500e0038.2000e0049.4700e0033.0000e0053.2300e0032.0000e0053.2500e0038.6000e0042.0000e0058.8000e0040.0000 2.7118 2.7118 7.0000e0050.0000 2.7135 Total 1.1800e0031.9700e0039.7200e0033.0000e0053.3000e0032.0000e0053.3200e0038.8000e0042.0000e0059.0000e0040.0000 3.0209 3.0209 9.0000e0050.0000 3.0232 Mitigated Construction Off-Site

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 2.9700e0030.0000 2.9700e0034.3000e0040.0000 4.3000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2967 2.7434 2.9338 6.2900e0030.1255 0.1255 0.1164 0.1164 0.0000 549.5642 549.5642 0.1671 0.0000 553.7408 Total 0.2967 2.7434 2.9338 6.2900e0032.9700e0030.1255 0.1285 4.3000e0040.1164 0.1168 0.0000 549.5642 549.5642 0.1671 0.0000 553.7408 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 14 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0150 0.5450 0.1198 1.4900e0030.0318 1.3300e0030.0331 8.7300e0031.2800e0030.0100 0.0000 146.5198 146.5198 0.0114 0.0000 146.8038 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0102 7.2400e0030.0838 2.7000e0040.0285 2.1000e0040.0287 7.5800e0031.9000e0047.7700e0030.0000 23.9821 23.9821 6.0000e0040.0000 23.9972 Total 0.0252 0.5522 0.2036 1.7600e0030.0603 1.5400e0030.0619 0.0163 1.4700e0030.0178 0.0000 170.5019 170.5019 0.0120 0.0000 170.8010 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Fugitive Dust 9.8000e0040.0000 9.8000e0041.4000e0040.0000 1.4000e0040.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1011 2.0161 2.5018 6.2900e0030.0925 0.0925 0.0925 0.0925 0.0000 367.3389 367.3389 0.1094 0.0000 370.0742 Total 0.1011 2.0161 2.5018 6.2900e0039.8000e0040.0925 0.0935 1.4000e0040.0925 0.0926 0.0000 367.3389 367.3389 0.1094 0.0000 370.0742 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 15 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0150 0.5450 0.1198 1.4900e0030.0318 1.3300e0030.0331 8.7300e0031.2800e0030.0100 0.0000 146.5198 146.5198 0.0114 0.0000 146.8038 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0102 7.2400e0030.0838 2.7000e0040.0285 2.1000e0040.0287 7.5800e0031.9000e0047.7700e0030.0000 23.9821 23.9821 6.0000e0040.0000 23.9972 Total 0.0252 0.5522 0.2036 1.7600e0030.0603 1.5400e0030.0619 0.0163 1.4700e0030.0178 0.0000 170.5019 170.5019 0.0120 0.0000 170.8010 Mitigated Construction Off-Site

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.2868 2.8965 2.8982 5.5700e0030.1386 0.1386 0.1286 0.1286 0.0000 485.5620 485.5620 0.1445 0.0000 489.1740 Total 0.2868 2.8965 2.8982 5.5700e0030.1386 0.1386 0.1286 0.1286 0.0000 485.5620 485.5620 0.1445 0.0000 489.1740 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.7500e0030.1624 0.0410 4.4000e0040.0111 3.0000e0040.0114 3.2000e0032.9000e0043.4900e0030.0000 42.3444 42.3444 2.6600e0030.0000 42.4109 Worker 0.0287 0.0205 0.2367 7.5000e0040.0806 5.9000e0040.0812 0.0214 5.4000e0040.0219 0.0000 67.7401 67.7401 1.7100e0030.0000 67.7828 Total 0.0334 0.1829 0.2776 1.1900e0030.0917 8.9000e0040.0926 0.0246 8.3000e0040.0254 0.0000 110.0845 110.0845 4.3700e0030.0000 110.1937 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0687 1.4134 1.7744 5.5700e0030.0730 0.0730 0.0730 0.0730 0.0000 251.7059 251.7059 0.0704 0.0000 253.4646 Total 0.0687 1.4134 1.7744 5.5700e0030.0730 0.0730 0.0730 0.0730 0.0000 251.7059 251.7059 0.0704 0.0000 253.4646 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 17 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.7500e0030.1624 0.0410 4.4000e0040.0111 3.0000e0040.0114 3.2000e0032.9000e0043.4900e0030.0000 42.3444 42.3444 2.6600e0030.0000 42.4109 Worker 0.0287 0.0205 0.2367 7.5000e0040.0806 5.9000e0040.0812 0.0214 5.4000e0040.0219 0.0000 67.7401 67.7401 1.7100e0030.0000 67.7828 Total 0.0334 0.1829 0.2776 1.1900e0030.0917 8.9000e0040.0926 0.0246 8.3000e0040.0254 0.0000 110.0845 110.0845 4.3700e0030.0000 110.1937 Mitigated Construction Off-Site

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.4573 4.4925 4.9064 9.4600e0030.2119 0.2119 0.1965 0.1965 0.0000 825.0794 825.0794 0.2451 0.0000 831.2077 Total 0.4573 4.4925 4.9064 9.4600e0030.2119 0.2119 0.1965 0.1965 0.0000 825.0794 825.0794 0.2451 0.0000 831.2077 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 18 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.9900e0030.2070 0.0624 7.2000e0040.0188 2.4000e0040.0191 5.4400e0032.3000e0045.6700e0030.0000 69.7363 69.7363 3.9800e0030.0000 69.8358 Worker 0.0459 0.0315 0.3708 1.2300e0030.1369 9.8000e0040.1379 0.0364 9.0000e0040.0373 0.0000 110.8246 110.8246 2.6200e0030.0000 110.8900 Total 0.0519 0.2385 0.4332 1.9500e0030.1558 1.2200e0030.1570 0.0418 1.1300e0030.0429 0.0000 180.5609 180.5609 6.6000e0030.0000 180.7258 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.1167 2.4018 3.0153 9.4600e0030.1240 0.1240 0.1240 0.1240 0.0000 427.7185 427.7185 0.1192 0.0000 430.6978 Total 0.1167 2.4018 3.0153 9.4600e0030.1240 0.1240 0.1240 0.1240 0.0000 427.7185 427.7185 0.1192 0.0000 430.6978 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 19 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.9900e0030.2070 0.0624 7.2000e0040.0188 2.4000e0040.0191 5.4400e0032.3000e0045.6700e0030.0000 69.7363 69.7363 3.9800e0030.0000 69.8358 Worker 0.0459 0.0315 0.3708 1.2300e0030.1369 9.8000e0040.1379 0.0364 9.0000e0040.0373 0.0000 110.8246 110.8246 2.6200e0030.0000 110.8900 Total 0.0519 0.2385 0.4332 1.9500e0030.1558 1.2200e0030.1570 0.0418 1.1300e0030.0429 0.0000 180.5609 180.5609 6.6000e0030.0000 180.7258 Mitigated Construction Off-Site

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0759 0.7309 0.8498 1.6400e0030.0339 0.0339 0.0314 0.0314 0.0000 142.7959 142.7959 0.0424 0.0000 143.8560 Total 0.0759 0.7309 0.8498 1.6400e0030.0339 0.0339 0.0314 0.0314 0.0000 142.7959 142.7959 0.0424 0.0000 143.8560 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 20 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.0100e0030.0357 0.0105 1.2000e0043.2600e0034.0000e0053.3000e0039.4000e0044.0000e0059.8000e0040.0000 12.0265 12.0265 6.8000e0040.0000 12.0434 Worker 7.5200e0034.9600e0030.0599 2.1000e0040.0237 1.7000e0040.0239 6.2900e0031.5000e0046.4500e0030.0000 18.5476 18.5476 4.1000e0040.0000 18.5580 Total 8.5300e0030.0407 0.0703 3.3000e0040.0270 2.1000e0040.0272 7.2300e0031.9000e0047.4300e0030.0000 30.5741 30.5741 1.0900e0030.0000 30.6014 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Off-Road 0.0202 0.4157 0.5219 1.6400e0030.0215 0.0215 0.0215 0.0215 0.0000 74.0238 74.0238 0.0206 0.0000 74.5389 Total 0.0202 0.4157 0.5219 1.6400e0030.0215 0.0215 0.0215 0.0215 0.0000 74.0238 74.0238 0.0206 0.0000 74.5389 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 21 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.0100e0030.0357 0.0105 1.2000e0043.2600e0034.0000e0053.3000e0039.4000e0044.0000e0059.8000e0040.0000 12.0265 12.0265 6.8000e0040.0000 12.0434 Worker 7.5200e0034.9600e0030.0599 2.1000e0040.0237 1.7000e0040.0239 6.2900e0031.5000e0046.4500e0030.0000 18.5476 18.5476 4.1000e0040.0000 18.5580 Total 8.5300e0030.0407 0.0703 3.3000e0040.0270 2.1000e0040.0272 7.2300e0031.9000e0047.4300e0030.0000 30.5741 30.5741 1.0900e0030.0000 30.6014 Mitigated Construction Off-Site

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 0.3084 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.0700e0030.0274 0.0407 7.0000e0051.3700e0031.3700e0031.3700e0031.3700e0030.0000 5.7448 5.7448 3.2000e0040.0000 5.7529 Total 0.3125 0.0274 0.0407 7.0000e0051.3700e0031.3700e0031.3700e0031.3700e0030.0000 5.7448 5.7448 3.2000e0040.0000 5.7529 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 22 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4900e0039.8000e0040.0118 4.0000e0054.6900e0033.0000e0054.7200e0031.2500e0033.0000e0051.2800e0030.0000 3.6709 3.6709 8.0000e0050.0000 3.6729 Total 1.4900e0039.8000e0040.0118 4.0000e0054.6900e0033.0000e0054.7200e0031.2500e0033.0000e0051.2800e0030.0000 3.6709 3.6709 8.0000e0050.0000 3.6729 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 0.3084 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.3400e0030.0305 0.0412 7.0000e0052.1400e0032.1400e0032.1400e0032.1400e0030.0000 5.7448 5.7448 3.2000e0040.0000 5.7529 Total 0.3098 0.0305 0.0412 7.0000e0052.1400e0032.1400e0032.1400e0032.1400e0030.0000 5.7448 5.7448 3.2000e0040.0000 5.7529 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 23 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

4.0 Operational Detail - Mobile

4.1 Mitigation Measures Mobile
Increase Transit Accessibility

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4900e0039.8000e0040.0118 4.0000e0054.6900e0033.0000e0054.7200e0031.2500e0033.0000e0051.2800e0030.0000 3.6709 3.6709 8.0000e0050.0000 3.6729 Total 1.4900e0039.8000e0040.0118 4.0000e0054.6900e0033.0000e0054.7200e0031.2500e0033.0000e0051.2800e0030.0000 3.6709 3.6709 8.0000e0050.0000 3.6729 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 24 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.1869 0.8808 2.2508 8.8200e0030.7779 6.4900e0030.7844 0.2084 6.0300e0030.2145 0.0000 816.2253 816.2253 0.0376 0.0000 817.1651 Unmitigated 0.2001 0.9555 2.5896 0.0104 0.9285 7.5900e0030.9361 0.2488 7.0500e0030.2558 0.0000 961.9549 961.9549 0.0433 0.0000 963.0366

4.2 Trip Summary Information

4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments Mid Rise 558.60 536.76 492.24 1,865,765 1,563,250 Enclosed Parking with Elevator 0.00 0.00 0.00
Strip Mall 332.40 315.30 153.23 579,075 485,184
Total 891.00 852.06 645.47 2,444,840 2,048,434
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 14.70 5.90 8.70 40.20 19.20 40.60 86 11 3 Enclosed Parking with Elevator 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Strip Mall 16.60 8.40 6.90 16.60 64.40 19.00 45 40 15

4.4 Fleet Mix
CalEEMod Version: CalEEMod.2016.3.2 Page 25 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Electricity
Mitigated

0.0000 0.0000 0.0000 0.0000 0.0000 647.9827 647.9827 0.0113 2.3400e003648.9612 Electricity
Unmitigated

0.0000 0.0000 0.0000 0.0000 0.0000 678.4776 678.4776 0.0118 2.4500e003679.5022 NaturalGas
Mitigated

4.7900e0030.0410 0.0177 2.6000e0043.3100e0033.3100e0033.3100e0033.3100e0030.0000 47.4355 47.4355 9.1000e0048.7000e00447.7173 NaturalGas
Unmitigated

5.0400e0030.0431 0.0186 2.7000e0043.4800e0033.4800e0033.4800e0033.4800e0030.0000 49.8667 49.8667 9.6000e0049.1000e00450.1631

5.1 Mitigation Measures Energy
Exceed Title 24
Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Mid Rise 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Enclosed Parking with Elevator 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Strip Mall 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Historical Energy Use: N
CalEEMod Version: CalEEMod.2016.3.2 Page 26 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Apartments Mid
Rise
922167 4.9700e0030.0425 0.0181 2.7000e0043.4400e0033.4400e0033.4400e0033.4400e0030.0000 49.2104 49.2104 9.4000e0049.0000e00449.5028 Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Strip Mall 12300 7.0000e0056.0000e0045.1000e0040.0000 5.0000e0055.0000e0055.0000e0055.0000e0050.0000 0.6564 0.6564 1.0000e0051.0000e0050.6603 Total 5.0400e0030.0431 0.0186 2.7000e0043.4900e0033.4900e0033.4900e0033.4900e0030.0000 49.8667 49.8667 9.5000e0049.1000e00450.1631 Unmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Apartments Mid
Rise
877581 4.7300e0030.0404 0.0172 2.6000e0043.2700e0033.2700e0033.2700e0033.2700e0030.0000 46.8311 46.8311 9.0000e0048.6000e00447.1094 Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Strip Mall 11325.4 6.0000e0055.6000e0044.7000e0040.0000 4.0000e0054.0000e0054.0000e0054.0000e0050.0000 0.6044 0.6044 1.0000e0051.0000e0050.6080 Total 4.7900e0030.0410 0.0177 2.6000e0043.3100e0033.3100e0033.3100e0033.3100e0030.0000 47.4355 47.4355 9.1000e0048.7000e00447.7173 Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 27 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

6.0 Area Detail

5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Apartments Mid
Rise
340505 257.0271 4.4800e0039.3000e004257.4153
Enclosed Parking
with Elevator
457080 345.0228 6.0100e0031.2400e003345.5438
Strip Mall 101250 76.4277 1.3300e0032.8000e00476.5431 Total 678.4776 0.0118 2.4500e003679.5022
Unmitigated
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Apartments Mid
Rise
338055 255.1779 4.4500e0039.2000e004255.5633
Enclosed Parking
with Elevator
422529 318.9424 5.5600e0031.1500e003319.4240
Strip Mall 97851.5 73.8624 1.2900e0032.7000e00473.9739 Total 647.9827 0.0113 2.3400e003648.9612
Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 28 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

6.1 Mitigation Measures Area

6.0 Area Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 0.6679 0.0318 1.4025 1.4100e0030.0850 0.0850 0.0850 0.0850 8.9224 18.5658 27.4882 0.0280 6.1000e00428.3682 Unmitigated 0.6679 0.0318 1.4025 1.4100e0030.0850 0.0850 0.0850 0.0850 8.9224 18.5658 27.4882 0.0280 6.1000e00428.3682 CalEEMod Version: CalEEMod.2016.3.2 Page 29 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating

0.0308 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products

0.3357 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2751 0.0218 0.5340 1.3600e0030.0802 0.0802 0.0802 0.0802 8.9224 17.1458 26.0682 0.0266 6.1000e00426.9139 Landscaping 0.0263 0.0100 0.8685 5.0000e0054.8100e0034.8100e0034.8100e0034.8100e0030.0000 1.4201 1.4201 1.3700e0030.0000 1.4543 Total 0.6679 0.0318 1.4025 1.4100e0030.0850 0.0850 0.0850 0.0850 8.9224 18.5658 27.4882 0.0280 6.1000e00428.3682 Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 30 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
Use Water Efficient Landscaping

7.1 Mitigation Measures Water

7.0 Water Detail

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating

0.0308 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products

0.3357 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hearth 0.2751 0.0218 0.5340 1.3600e0030.0802 0.0802 0.0802 0.0802 8.9224 17.1458 26.0682 0.0266 6.1000e00426.9139 Landscaping 0.0263 0.0100 0.8685 5.0000e0054.8100e0034.8100e0034.8100e0034.8100e0030.0000 1.4201 1.4201 1.3700e0030.0000 1.4543 Total 0.6679 0.0318 1.4025 1.4100e0030.0850 0.0850 0.0850 0.0850 8.9224 18.5658 27.4882 0.0280 6.1000e00428.3682 Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 31 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
Total CO2 CH4 N2O CO2e
Category MT/yr
Mitigated 92.9562 0.1980 4.9700e00399.3868
Unmitigated 92.9562 0.1980 4.9700e00399.3868

7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Apartments Mid
Rise

5.47294 /

3.45033

84.4641 0.1798 4.5100e00390.3023
Enclosed Parking
with Elevator
0 / 0 0.0000 0.0000 0.0000 0.0000
Strip Mall 0.555544 /

0.340495

8.4921 0.0183 4.6000e0049.0846
Total 92.9562 0.1980 4.9700e00399.3868
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 32 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

8.1 Mitigation Measures Waste
Institute Recycling and Composting Services

7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Apartments Mid
Rise

5.47294 /

3.45033

84.4641 0.1798 4.5100e00390.3023
Enclosed Parking
with Elevator
0 / 0 0.0000 0.0000 0.0000 0.0000
Strip Mall 0.555544 /

0.340495

8.4921 0.0183 4.6000e0049.0846
Total 92.9562 0.1980 4.9700e00399.3868
Mitigated

8.0 Waste Detail
CalEEMod Version: CalEEMod.2016.3.2 Page 33 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual
Total CO2 CH4 N2O CO2e
MT/yr
Mitigated 0.0000 0.0000 0.0000 0.0000
Unmitigated 9.4431 0.5581 0.0000 23.3950
Category/Year

8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Apartments Mid
Rise

38.64 7.8436 0.4635 0.0000 19.4321
Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000
Strip Mall 7.88 1.5996 0.0945 0.0000 3.9629
Total 9.4431 0.5581 0.0000 23.3950
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 34 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Apartments Mid
Rise

0.0000 0.0000 0.0000 0.0000
Enclosed Parking
with Elevator

0.0000 0.0000 0.0000 0.0000
Strip Mall 0.0000 0.0000 0.0000 0.0000
Total 0.0000 0.0000 0.0000 0.0000
Mitigated

9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type

10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2016.3.2 Page 35 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

11.0 Vegetation
CalEEMod Version: CalEEMod.2016.3.2 Page 36 of 36 Date: 4/29/2020 5:38 PM 86 Fair Oaks - South Coast Air Basin, Annual

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Enclosed Parking with Elevator 195.00 Space 0.00 78,000.00 0 Apartments Mid Rise 84.00 Dwelling Unit 0.74 84,000.00 240 Strip Mall 7.50 1000sqft 0.00 7,500.00 0

1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
12 Wind Speed (m/s) 2.2 Precipitation Freq (Days) 31

1.3 User Entered Comments & Non-Default Data

1.0 Project Characteristics
Utility Company Pasadena Water & Power
Operational Year 2024
CO2 Intensity
(lb/MWhr)
1664.14 CH4 Intensity 0.029
(lb/MWhr)
N2O Intensity 0.006
(lb/MWhr)
86 Fair Oaks
South Coast Air Basin, Summer
CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer
Project Characteristics - CO2e intensity factor updated per SoCal Edison's 2018 Sustainability Report, see:
https://www.edison.com/content/dam/eix/documents/sustainability/eix-2018-sustainability-report.pdf Land Use - 4 work/live units (1,300 sf) included as a retail land use.

Construction Phase - Schedule per the Applicant's Construction Questionnaire.

Off-road Equipment - Construction equipment per the Applicant's Construction Questionnaire. Any hours changed based on Appendix D of CalEEMod Users Guide for a lot under 1 acre.

Off-road Equipment - Construction equipment per the Construction Questionnaire.

Off-road Equipment - From construction questionnaire.

Trips and VMT - haul route round trip = 26 miles
Demolition -
Grading - size of the project site
Construction Off-road Equipment Mitigation - Tier 3 equipment per the Construction Questionnaire. Soil stabilizers and ground cover reductions from SCAQMD CEQA Guidelines.

Mobile Land Use Mitigation - Project site near two Metro Gold Line stations.

Energy Mitigation -
Water Mitigation -
Waste Mitigation -
Off-road Equipment -
Energy Use -
Table Name Column Name Default Value New Value
tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 12 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer
tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 13.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
CalEEMod Version: CalEEMod.2016.3.2 Page 3 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer
tblConstructionPhase NumDays 5.00 45.00
tblConstructionPhase NumDays 100.00 458.00
tblConstructionPhase NumDays 10.00 21.00
tblConstructionPhase NumDays 2.00 130.00
tblConstructionPhase PhaseEndDate 6/14/2022 3/1/2024
tblConstructionPhase PhaseEndDate 6/7/2022 3/1/2024
tblConstructionPhase PhaseEndDate 1/14/2022 1/31/2022
tblConstructionPhase PhaseEndDate 1/18/2022 8/1/2022
tblConstructionPhase PhaseStartDate 6/8/2022 1/1/2024
tblConstructionPhase PhaseStartDate 1/19/2022 6/1/2022
tblConstructionPhase PhaseStartDate 1/15/2022 2/1/2022
tblGrading AcresOfGrading 0.00 0.74
tblGrading MaterialExported 0.00 45,500.00
tblLandUse LotAcreage 1.75 0.00
tblLandUse LotAcreage 2.21 0.74
tblLandUse LotAcreage 0.17 0.00
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblOffRoadEquipment OffRoadEquipmentType Off-Highway Trucks tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Concrete/Industrial Saws tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Bore/Drill Rigs tblOffRoadEquipment OffRoadEquipmentType Off-Highway Trucks tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment CalEEMod Version: CalEEMod.2016.3.2 Page 4 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

2.0 Emissions Summary
tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Concrete/Industrial Saws tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment tblOffRoadEquipment OffRoadEquipmentType Paving Equipment tblOffRoadEquipment OffRoadEquipmentType Rollers
tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Surfacing Equipment tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblTripsAndVMT HaulingTripLength 20.00 13.00
tblTripsAndVMT HaulingTripLength 20.00 13.00
CalEEMod Version: CalEEMod.2016.3.2 Page 5 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2022 9.1355 90.6934 90.0197 0.2130 2.2100 3.7774 5.9874 0.5884 3.5046 4.0930 0.0000 20,896.17 23 20,896.17
23 5.1775 0.0000 21,025.61
07 2023 3.9167 36.3491 41.2768 0.0883 1.2202 1.6390 2.8592 0.3270 1.5204 1.8474 0.0000 8,580.604 1 8,580.604
1 2.1348 0.0000 8,633.973
4 2024 17.7056 35.5099 43.4662 0.0928 1.4326 1.5759 3.0085 0.3833 1.4659 1.8491 0.0000 9,015.844 7 9,015.844
7 2.1513 0.0000 9,069.626
8 Maximum 17.7056 90.6934 90.0197 0.2130 2.2100 3.7774 5.9874 0.5884 3.5046 4.0930 0.0000 20,896.17 23 20,896.17
23 5.1775 0.0000 21,025.61
07 Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2022 3.2759 60.1179 68.6844 0.2130 2.1795 2.4122 4.5917 0.5840 2.4103 2.9942 0.0000 14,436.19 00 14,436.19
00 3.1316 0.0000 14,514.47
92 2023 1.2970 20.2670 26.7301 0.0883 1.2202 0.9632 2.1835 0.3270 0.9626 1.2895 0.0000 5,211.2590 5,211.2590 1.0667 0.0000 5,237.927 0 2024 15.1101 21.6394 28.9144 0.0928 1.4326 1.0597 2.4923 0.3833 1.0589 1.4421 0.0000 5,646.591 0 5,646.591
0 1.0833 0.0000 5,673.672
5 Maximum 15.1101 60.1179 68.6844 0.2130 2.1795 2.4122 4.5917 0.5840 2.4103 2.9942 0.0000 14,436.19 00 14,436.19
00 3.1316 0.0000 14,514.47
92 Mitigated Construction
CalEEMod Version: CalEEMod.2016.3.2 Page 6 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

36.01 37.24 28.86 0.00 0.63 36.57 21.83 0.34 31.72 26.49 0.00 34.29 34.29 44.19 0.00 34.35 CalEEMod Version: CalEEMod.2016.3.2 Page 7 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.3439 2.3585 0.0534 2,386.221
7 Energy 0.0276 0.2361 0.1019 1.5100e0030.0191 0.0191 0.0191 0.0191 301.1981 301.1981 5.7700e0035.5200e003302.9880 Mobile 1.2341 5.2965 15.4900 0.0618 5.4007 0.0433 5.4440 1.4447 0.0403 1.4850 6,296.683 9 6,296.683
9 0.2743 6,303.541
8 Total 25.4913 7.3555 65.2580 0.1726 5.4007 6.5175 11.9182 1.4447 6.5144 7.9591 786.8212 8,122.404 7 8,909.225
9 2.6386 0.0589 8,992.751
5 Unmitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.3439 2.3585 0.0534 2,386.221
7 Energy 0.0263 0.2246 0.0968 1.4300e0030.0182 0.0182 0.0182 0.0182 286.5131 286.5131 5.4900e0035.2500e003288.2157 Mobile 1.1573 4.9027 13.3844 0.0524 4.5250 0.0371 4.5621 1.2105 0.0345 1.2449 5,343.517 2 5,343.517
2 0.2378 5,349.462
0 Total 25.4131 6.9502 63.1475 0.1632 4.5250 6.5103 11.0354 1.2105 6.5077 7.7181 786.8212 7,154.553 0 7,941.374
2 2.6018 0.0587 8,023.899
4 Mitigated Operational
CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Demolition Demolition 1/1/2022 1/31/2022 5 21
2 Grading Grading 2/1/2022 8/1/2022 5 130
3 Building Construction Building Construction 6/1/2022 3/1/2024 5 458 4 Architectural Coating Architectural Coating 1/1/2024 3/1/2024 5 45 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Grading Excavators 2 8.00 158 0.38
Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Grading Concrete/Industrial Saws 1 8.00 81 0.73
Demolition Excavators 1 8.00 158 0.38
Demolition Off-Highway Trucks 1 8.00 402 0.38
Demolition Other Construction Equipment 3 8.00 172 0.42 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.31 5.51 3.23 5.47 16.21 0.11 7.41 16.21 0.10 3.03 0.00 11.92 10.86 1.40 0.46 10.77 Residential Indoor: 170,100; Residential Outdoor: 56,700; Non-Residential Indoor: 11,250; Non-Residential Outdoor: 3,750; Striped Parking Area: 4,680 (Architectural Coating ±sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0.74
Acres of Paving: 0
CalEEMod Version: CalEEMod.2016.3.2 Page 9 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer
Demolition Rough Terrain Forklifts 1 8.00 100 0.40
Demolition Rubber Tired Loaders 1 8.00 203 0.36
Demolition Signal Boards 2 8.00 6 0.82
Building Construction Forklifts 0 6.00 89 0.20
Grading Bore/Drill Rigs 1 8.00 221 0.50
Grading Off-Highway Trucks 2 8.00 402 0.38
Demolition Tractors/Loaders/Backhoes 1 6.00 97 0.37
Grading Other Construction Equipment 5 8.00 172 0.42
Grading Rough Terrain Forklifts 1 8.00 100 0.40
Grading Tractors/Loaders/Backhoes 1 6.00 97 0.37
Grading Rubber Tired Loaders 1 8.00 203 0.36
Grading Signal Boards 2 8.00 6 0.82
Building Construction Cranes 1 4.00 231 0.29
Demolition Rubber Tired Dozers 0 1.00 247 0.40
Grading Rubber Tired Dozers 0 1.00 247 0.40
Building Construction Concrete/Industrial Saws 1 8.00 81 0.73 Building Construction Other Construction Equipment 5 8.00 172 0.42 Building Construction Paving Equipment 1 7.00 132 0.36
Building Construction Rollers 1 7.00 80 0.38
Building Construction Rough Terrain Forklifts 1 6.00 100 0.40 Building Construction Rubber Tired Loaders 1 8.00 203 0.36 Building Construction Signal Boards 2 8.00 6 0.82
Building Construction Surfacing Equipment 2 8.00 263 0.30 Building Construction Tractors/Loaders/Backhoes 1 8.00 97 0.37 Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
CalEEMod Version: CalEEMod.2016.3.2 Page 10 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.1274 0.0000 0.1274 0.0193 0.0000 0.0193 0.0000 0.0000 Off-Road 2.8580 26.5180 28.4394 0.0566 1.2279 1.2279 1.1439 1.1439 5,430.634 2 5,430.634
2 1.5754 5,470.018
4 Total 2.8580 26.5180 28.4394 0.0566 0.1274 1.2279 1.3552 0.0193 1.1439 1.1632 5,430.634 2 5,430.634
2 1.5754 5,470.018
4 Unmitigated Construction On-Site

3.1 Mitigation Measures Construction
Use Alternative Fuel for Construction Equipment
Use Cleaner Engines for Construction Equipment
Use Soil Stabilizer
Replace Ground Cover
Water Exposed Area
Water Unpaved Roads
Reduce Vehicle Speed on Unpaved Roads
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 11 28.00 0.00 12.00 14.70 6.90 13.00 LD_Mix HDT_Mix HHDT Grading 16 40.00 0.00 5,688.00 14.70 6.90 13.00 LD_Mix HDT_Mix HHDT Building Construction 16 96.00 23.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 19.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Page 11 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 2.9700e0030.1071 0.0231 3.0000e0046.4900e0032.7000e0046.7600e0031.7800e0032.5000e0042.0300e00332.7936 32.7936 2.4600e00332.8551 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1099 0.0691 0.9722 3.0000e0030.3130 2.2500e0030.3152 0.0830 2.0700e0030.0851 298.8337 298.8337 7.5500e003299.0225 Total 0.1129 0.1761 0.9953 3.3000e0030.3195 2.5200e0030.3220 0.0848 2.3200e0030.0871 331.6272 331.6272 0.0100 331.8776 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.0422 0.0000 0.0422 6.3900e0030.0000 6.3900e0030.0000 0.0000 Off-Road 0.8718 17.7889 22.4996 0.0566 0.8960 0.8960 0.8960 0.8960 0.0000 3,537.013 2 3,537.013
2 0.9846 3,561.628
0 Total 0.8718 17.7889 22.4996 0.0566 0.0422 0.8960 0.9382 6.3900e0030.8960 0.9023 0.0000 3,537.013 2 3,537.013
2 0.9846 3,561.628
0 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 12 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 2.9700e0030.1071 0.0231 3.0000e0046.4900e0032.7000e0046.7600e0031.7800e0032.5000e0042.0300e00332.7936 32.7936 2.4600e00332.8551 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1099 0.0691 0.9722 3.0000e0030.3130 2.2500e0030.3152 0.0830 2.0700e0030.0851 298.8337 298.8337 7.5500e003299.0225 Total 0.1129 0.1761 0.9953 3.3000e0030.3195 2.5200e0030.3220 0.0848 2.3200e0030.0871 331.6272 331.6272 0.0100 331.8776 Mitigated Construction Off-Site

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.0456 0.0000 0.0456 6.6500e0030.0000 6.6500e0030.0000 0.0000 Off-Road 4.5649 42.2054 45.1350 0.0968 1.9306 1.9306 1.7904 1.7904 9,319.858 1 9,319.858
1 2.8332 9,390.688
7 Total 4.5649 42.2054 45.1350 0.0968 0.0456 1.9306 1.9762 6.6500e0031.7904 1.7970 9,319.858 1 9,319.858
1 2.8332 9,390.688
7 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 13 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.2276 8.1972 1.7713 0.0231 0.4971 0.0203 0.5174 0.1362 0.0194 0.1557 2,510.976 6 2,510.976
6 0.1886 2,515.692
1 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1571 0.0986 1.3889 4.2800e0030.4471 3.2100e0030.4503 0.1186 2.9600e0030.1215 426.9053 426.9053 0.0108 427.1750 Total 0.3846 8.2959 3.1601 0.0274 0.9442 0.0235 0.9677 0.2548 0.0224 0.2772 2,937.881 9 2,937.881
9 0.1994 2,942.867
0 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.0151 0.0000 0.0151 2.2000e0030.0000 2.2000e0030.0000 0.0000 Off-Road 1.5561 31.0176 38.4897 0.0968 1.4231 1.4231 1.4231 1.4231 0.0000 6,229.574 6 6,229.574
6 1.8554 6,275.960
1 Total 1.5561 31.0176 38.4897 0.0968 0.0151 1.4231 1.4383 2.2000e0031.4231 1.4253 0.0000 6,229.574 6 6,229.574
6 1.8554 6,275.960
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 14 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.2276 8.1972 1.7713 0.0231 0.4971 0.0203 0.5174 0.1362 0.0194 0.1557 2,510.976 6 2,510.976
6 0.1886 2,515.692
1 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1571 0.0986 1.3889 4.2800e0030.4471 3.2100e0030.4503 0.1186 2.9600e0030.1215 426.9053 426.9053 0.0108 427.1750 Total 0.3846 8.2959 3.1601 0.0274 0.9442 0.0235 0.9677 0.2548 0.0224 0.2772 2,937.881 9 2,937.881
9 0.1994 2,942.867
0 Mitigated Construction Off-Site

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 3.7484 37.8633 37.8849 0.0728 1.8117 1.8117 1.6810 1.6810 6,996.608 1 6,996.608
1 2.0818 7,048.654
0 Total 3.7484 37.8633 37.8849 0.0728 1.8117 1.8117 1.6810 1.6810 6,996.608 1 6,996.608
1 2.0818 7,048.654
0 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 15 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0607 2.0922 0.5064 5.7600e0030.1472 3.9100e0030.1511 0.0424 3.7400e0030.0461 617.2515 617.2515 0.0372 618.1811 Worker 0.3769 0.2367 3.3333 0.0103 1.0731 7.7100e0031.0808 0.2846 7.1000e0030.2917 1,024.572 6 1,024.572
6 0.0259 1,025.219
9 Total 0.4376 2.3289 3.8397 0.0160 1.2202 0.0116 1.2319 0.3270 0.0108 0.3378 1,641.824 1 1,641.824
1 0.0631 1,643.401
0 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.909 4 3,626.909
4 1.0137 3,652.2511
Total 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.909 4 3,626.909
4 1.0137 3,652.251
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0607 2.0922 0.5064 5.7600e0030.1472 3.9100e0030.1511 0.0424 3.7400e0030.0461 617.2515 617.2515 0.0372 618.1811 Worker 0.3769 0.2367 3.3333 0.0103 1.0731 7.7100e0031.0808 0.2846 7.1000e0030.2917 1,024.572 6 1,024.572
6 0.0259 1,025.219
9 Total 0.4376 2.3289 3.8397 0.0160 1.2202 0.0116 1.2319 0.3270 0.0108 0.3378 1,641.824 1 1,641.824
1 0.0631 1,643.401
0 Mitigated Construction Off-Site

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 3.5173 34.5577 37.7416 0.0728 1.6296 1.6296 1.5118 1.5118 6,996.1107 6,996.1107 2.0786 7,048.074 3 Total 3.5173 34.5577 37.7416 0.0728 1.6296 1.6296 1.5118 1.5118 6,996.110 7 6,996.110
7 2.0786 7,048.074
3 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 17 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0450 1.5772 0.4571 5.5800e0030.1472 1.8100e0030.1490 0.0424 1.7300e0030.0441 598.0839 598.0839 0.0329 598.9056 Worker 0.3544 0.2142 3.0782 9.9000e0031.0731 7.5100e0031.0806 0.2846 6.9200e0030.2915 986.4095 986.4095 0.0234 986.9934 Total 0.3995 1.7914 3.5353 0.0155 1.2202 9.3200e0031.2296 0.3270 8.6500e0030.3356 1,584.493 4 1,584.493
4 0.0562 1,585.899
1 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.765 6 3,626.765
6 1.0105 3,652.027
9 Total 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.765 6 3,626.765
6 1.0105 3,652.027
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 18 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0450 1.5772 0.4571 5.5800e0030.1472 1.8100e0030.1490 0.0424 1.7300e0030.0441 598.0839 598.0839 0.0329 598.9056 Worker 0.3544 0.2142 3.0782 9.9000e0031.0731 7.5100e0031.0806 0.2846 6.9200e0030.2915 986.4095 986.4095 0.0234 986.9934 Total 0.3995 1.7914 3.5353 0.0155 1.2202 9.3200e0031.2296 0.3270 8.6500e0030.3356 1,584.493 4 1,584.493
4 0.0562 1,585.899
1 Mitigated Construction Off-Site

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 3.3717 32.4842 37.7690 0.0728 1.5043 1.5043 1.3951 1.3951 6,995.802 2 6,995.802
2 2.0774 7,047.737
3 Total 3.3717 32.4842 37.7690 0.0728 1.5043 1.5043 1.3951 1.3951 6,995.802 2 6,995.802
2 2.0774 7,047.737
3 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 19 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0441 1.5731 0.4441 5.5500e0030.1472 1.7900e0030.1490 0.0424 1.7100e0030.0441 595.8910 595.8910 0.0324 596.7008 Worker 0.3354 0.1952 2.8741 9.5700e0031.0731 7.4100e0031.0805 0.2846 6.8200e0030.2914 953.9089 953.9089 0.0214 954.4441 Total 0.3795 1.7683 3.3182 0.0151 1.2202 9.2000e0031.2294 0.3270 8.5300e0030.3355 1,549.799 9 1,549.799
9 0.0538 1,551.144
9 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.548 6 3,626.548
6 1.0094 3,651.783
0 Total 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.548 6 3,626.548
6 1.0094 3,651.783
0 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 20 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0441 1.5731 0.4441 5.5500e0030.1472 1.7900e0030.1490 0.0424 1.7100e0030.0441 595.8910 595.8910 0.0324 596.7008 Worker 0.3354 0.1952 2.8741 9.5700e0031.0731 7.4100e0031.0805 0.2846 6.8200e0030.2914 953.9089 953.9089 0.0214 954.4441 Total 0.3795 1.7683 3.3182 0.0151 1.2202 9.2000e0031.2294 0.3270 8.5300e0030.3355 1,549.799 9 1,549.799
9 0.0538 1,551.144
9 Mitigated Construction Off-Site

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 13.7072 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 13.8880 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 21 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0664 0.0386 0.5688 1.8900e0030.2124 1.4700e0030.2138 0.0563 1.3500e0030.0577 188.7945 188.7945 4.2400e003188.9004 Total 0.0664 0.0386 0.5688 1.8900e0030.2124 1.4700e0030.2138 0.0563 1.3500e0030.0577 188.7945 188.7945 4.2400e003188.9004 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 13.7072 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e0030.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.8443 Total 13.7667 1.3570 1.8324 2.9700e0030.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.8443 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 22 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

4.0 Operational Detail - Mobile

4.1 Mitigation Measures Mobile
Increase Transit Accessibility

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0664 0.0386 0.5688 1.8900e0030.2124 1.4700e0030.2138 0.0563 1.3500e0030.0577 188.7945 188.7945 4.2400e003188.9004 Total 0.0664 0.0386 0.5688 1.8900e0030.2124 1.4700e0030.2138 0.0563 1.3500e0030.0577 188.7945 188.7945 4.2400e003188.9004 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 23 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 1.1573 4.9027 13.3844 0.0524 4.5250 0.0371 4.5621 1.2105 0.0345 1.2449 5,343.517 2 5,343.517
2 0.2378 5,349.462
0 Unmitigated 1.2341 5.2965 15.4900 0.0618 5.4007 0.0433 5.4440 1.4447 0.0403 1.4850 6,296.683 9 6,296.683
9 0.2743 6,303.541
8 4.2 Trip Summary Information

4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments Mid Rise 558.60 536.76 492.24 1,865,765 1,563,250 Enclosed Parking with Elevator 0.00 0.00 0.00
Strip Mall 332.40 315.30 153.23 579,075 485,184
Total 891.00 852.06 645.47 2,444,840 2,048,434
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 14.70 5.90 8.70 40.20 19.20 40.60 86 11 3 Enclosed Parking with Elevator 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Strip Mall 16.60 8.40 6.90 16.60 64.40 19.00 45 40 15

4.4 Fleet Mix
CalEEMod Version: CalEEMod.2016.3.2 Page 24 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas
Mitigated

0.0263 0.2246 0.0968 1.4300e0030.0182 0.0182 0.0182 0.0182 286.5131 286.5131 5.4900e0035.2500e003288.2157 NaturalGas
Unmitigated

0.0276 0.2361 0.1019 1.5100e0030.0191 0.0191 0.0191 0.0191 301.1981 301.1981 5.7700e0035.5200e003302.9880

5.1 Mitigation Measures Energy
Exceed Title 24
Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Mid Rise 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Enclosed Parking with Elevator 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Strip Mall 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Historical Energy Use: N
CalEEMod Version: CalEEMod.2016.3.2 Page 25 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

6.0 Area Detail

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments Mid
Rise
2526.49 0.0273 0.2328 0.0991 1.4900e0030.0188 0.0188 0.0188 0.0188 297.2336 297.2336 5.7000e0035.4500e003298.9999 Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Strip Mall 33.6986 3.6000e0043.3000e0032.7800e0032.0000e0052.5000e0042.5000e0042.5000e0042.5000e0043.9645 3.9645 8.0000e0057.0000e0053.9881 Total 0.0276 0.2361 0.1019 1.5100e0030.0191 0.0191 0.0191 0.0191 301.1981 301.1981 5.7800e0035.5200e003302.9880 Unmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments Mid
Rise

2.40433 0.0259 0.2216 0.0943 1.4100e0030.0179 0.0179 0.0179 0.0179 282.8627 282.8627 5.4200e0035.1900e003284.5436 Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Strip Mall 0.0310284 3.3000e0043.0400e0032.5600e0032.0000e0052.3000e0042.3000e0042.3000e0042.3000e0043.6504 3.6504 7.0000e0057.0000e0053.6721 Total 0.0263 0.2246 0.0969 1.4300e0030.0181 0.0181 0.0181 0.0181 286.5131 286.5131 5.4900e0035.2600e003288.2157 Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 26 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

6.1 Mitigation Measures Area

6.0 Area Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.3439 2.3585 0.0534 2,386.221
7 Unmitigated 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.3439 2.3585 0.0534 2,386.221
7 CalEEMod Version: CalEEMod.2016.3.2 Page 27 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating

0.1690 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products

1.8393 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 22.0110 1.7429 42.7184 0.1090 6.4166 6.4166 6.4166 6.4166 786.8212 1,512.000 0 2,298.821
2 2.3465 0.0534 2,373.396
8 Landscaping 0.2102 0.0800 6.9478 3.7000e0040.0385 0.0385 0.0385 0.0385 12.5227 12.5227 0.0121 12.8249 Total 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.343
9 2.3585 0.0534 2,386.221
7 Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 28 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

8.1 Mitigation Measures Waste
Institute Recycling and Composting Services
Use Water Efficient Landscaping

7.1 Mitigation Measures Water

7.0 Water Detail

8.0 Waste Detail

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating

0.1690 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products

1.8393 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 22.0110 1.7429 42.7184 0.1090 6.4166 6.4166 6.4166 6.4166 786.8212 1,512.000 0 2,298.821
2 2.3465 0.0534 2,373.396
8 Landscaping 0.2102 0.0800 6.9478 3.7000e0040.0385 0.0385 0.0385 0.0385 12.5227 12.5227 0.0121 12.8249 Total 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.343
9 2.3585 0.0534 2,386.221
7 Mitigated

9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Page 29 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

11.0 Vegetation

10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2016.3.2 Page 30 of 30 Date: 4/29/2020 5:39 PM 86 Fair Oaks - South Coast Air Basin, Summer

1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Enclosed Parking with Elevator 195.00 Space 0.00 78,000.00 0 Apartments Mid Rise 84.00 Dwelling Unit 0.74 84,000.00 240 Strip Mall 7.50 1000sqft 0.00 7,500.00 0

1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
12 Wind Speed (m/s) 2.2 Precipitation Freq (Days) 31

1.3 User Entered Comments & Non-Default Data

1.0 Project Characteristics
Utility Company Pasadena Water & Power
Operational Year 2024
CO2 Intensity
(lb/MWhr)
1664.14 CH4 Intensity 0.029
(lb/MWhr)
N2O Intensity 0.006
(lb/MWhr)
86 Fair Oaks
South Coast Air Basin, Winter
CalEEMod Version: CalEEMod.2016.3.2 Page 1 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter
Project Characteristics - CO2e intensity factor updated per SoCal Edison's 2018 Sustainability Report, see:
https://www.edison.com/content/dam/eix/documents/sustainability/eix-2018-sustainability-report.pdf Land Use - 4 work/live units (1,300 sf) included as a retail land use.

Construction Phase - Schedule per the Applicant's Construction Questionnaire.

Off-road Equipment - Construction equipment per the Applicant's Construction Questionnaire. Any hours changed based on Appendix D of CalEEMod Users Guide for a lot under 1 acre.

Off-road Equipment - Construction equipment per the Construction Questionnaire.

Off-road Equipment - From construction questionnaire.

Trips and VMT - haul route round trip = 26 miles
Demolition -
Grading - size of the project site
Construction Off-road Equipment Mitigation - Tier 3 equipment per the Construction Questionnaire. Soil stabilizers and ground cover reductions from SCAQMD CEQA Guidelines.

Mobile Land Use Mitigation - Project site near two Metro Gold Line stations.

Energy Mitigation -
Water Mitigation -
Waste Mitigation -
Off-road Equipment -
Energy Use -
Table Name Column Name Default Value New Value
tblConstDustMitigation WaterUnpavedRoadMoistureContent 0 12 tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 0 15 tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation FuelType Diesel Electrical
tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter
tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 13.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
tblConstEquipMitigation Tier No Change Tier 3
CalEEMod Version: CalEEMod.2016.3.2 Page 3 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter
tblConstructionPhase NumDays 5.00 45.00
tblConstructionPhase NumDays 100.00 458.00
tblConstructionPhase NumDays 10.00 21.00
tblConstructionPhase NumDays 2.00 130.00
tblConstructionPhase PhaseEndDate 6/14/2022 3/1/2024
tblConstructionPhase PhaseEndDate 6/7/2022 3/1/2024
tblConstructionPhase PhaseEndDate 1/14/2022 1/31/2022
tblConstructionPhase PhaseEndDate 1/18/2022 8/1/2022
tblConstructionPhase PhaseStartDate 6/8/2022 1/1/2024
tblConstructionPhase PhaseStartDate 1/19/2022 6/1/2022
tblConstructionPhase PhaseStartDate 1/15/2022 2/1/2022
tblGrading AcresOfGrading 0.00 0.74
tblGrading MaterialExported 0.00 45,500.00
tblLandUse LotAcreage 1.75 0.00
tblLandUse LotAcreage 2.21 0.74
tblLandUse LotAcreage 0.17 0.00
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblOffRoadEquipment OffRoadEquipmentType Excavators
tblOffRoadEquipment OffRoadEquipmentType Off-Highway Trucks tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Concrete/Industrial Saws tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Bore/Drill Rigs tblOffRoadEquipment OffRoadEquipmentType Off-Highway Trucks tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment CalEEMod Version: CalEEMod.2016.3.2 Page 4 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

2.0 Emissions Summary
tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Concrete/Industrial Saws tblOffRoadEquipment OffRoadEquipmentType Other Construction Equipment tblOffRoadEquipment OffRoadEquipmentType Paving Equipment tblOffRoadEquipment OffRoadEquipmentType Rollers
tblOffRoadEquipment OffRoadEquipmentType Rough Terrain Forklifts tblOffRoadEquipment OffRoadEquipmentType Rubber Tired Loaders tblOffRoadEquipment OffRoadEquipmentType Signal Boards
tblOffRoadEquipment OffRoadEquipmentType Surfacing Equipment tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblTripsAndVMT HaulingTripLength 20.00 13.00
tblTripsAndVMT HaulingTripLength 20.00 13.00
CalEEMod Version: CalEEMod.2016.3.2 Page 5 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2022 9.2028 90.7466 89.7817 0.2113 2.2100 3.7780 5.9880 0.5884 3.5052 4.0936 0.0000 20,726.74 30 20,726.74
30 5.1869 0.0000 20,856.41
49 2023 3.9574 36.3615 41.0170 0.0875 1.2202 1.6391 2.8593 0.3270 1.5205 1.8475 0.0000 8,503.224 8 8,503.224
8 2.1352 0.0000 8,556.605
5 2024 17.7526 35.5246 43.1640 0.0919 1.4326 1.5760 3.0086 0.3833 1.4659 1.8492 0.0000 8,928.818 9 8,928.818
9 2.1515 0.0000 8,982.606
4 Maximum 17.7526 90.7466 89.7817 0.2113 2.2100 3.7780 5.9880 0.5884 3.5052 4.0936 0.0000 20,726.74 30 20,726.74
30 5.1869 0.0000 20,856.41
49 Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2022 3.3431 60.1711 68.4464 0.2113 2.1795 2.4128 4.5923 0.5840 2.4109 2.9948 0.0000 14,266.76 08 14,266.76
08 3.1409 0.0000 14,345.28
33 2023 1.3376 20.2794 26.4703 0.0875 1.2202 0.9633 2.1835 0.3270 0.9626 1.2896 0.0000 5,133.879 8 5,133.879
8 1.0672 0.0000 5,160.559
1 2024 15.1571 21.6542 28.6122 0.0919 1.4326 1.0597 2.4923 0.3833 1.0590 1.4422 0.0000 5,559.565 3 5,559.565
3 1.0835 0.0000 5,586.652
1 Maximum 15.1571 60.1711 68.4464 0.2113 2.1795 2.4128 4.5923 0.5840 2.4109 2.9948 0.0000 14,266.76 08 14,266.76
08 3.1409 0.0000 14,345.28
33 Mitigated Construction
CalEEMod Version: CalEEMod.2016.3.2 Page 6 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

35.83 37.22 28.99 0.00 0.63 36.57 21.83 0.34 31.72 26.49 0.00 34.59 34.59 44.14 0.00 34.65 CalEEMod Version: CalEEMod.2016.3.2 Page 7 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.3439 2.3585 0.0534 2,386.221
7 Energy 0.0276 0.2361 0.1019 1.5100e0030.0191 0.0191 0.0191 0.0191 301.1981 301.1981 5.7700e0035.5200e003302.9880 Mobile 1.1798 5.3896 14.6029 0.0586 5.4007 0.0435 5.4443 1.4447 0.0405 1.4852 5,977.168 4 5,977.168
4 0.2746 5,984.033
3 Total 25.4370 7.4486 64.3709 0.1694 5.4007 6.5177 11.9184 1.4447 6.5146 7.9593 786.8212 7,802.889 2 8,589.710
4 2.6389 0.0589 8,673.243
0 Unmitigated Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.3439 2.3585 0.0534 2,386.221
7 Energy 0.0263 0.2246 0.0968 1.4300e0030.0182 0.0182 0.0182 0.0182 286.5131 286.5131 5.4900e0035.2500e003288.2157 Mobile 1.1050 4.9722 12.7188 0.0497 4.5250 0.0373 4.5623 1.2105 0.0347 1.2451 5,069.367 7 5,069.367
7 0.2391 5,075.344
0 Total 25.3608 7.0197 62.4818 0.1605 4.5250 6.5105 11.0356 1.2105 6.5079 7.7183 786.8212 6,880.403 5 7,667.224
6 2.6031 0.0587 7,749.781
4 Mitigated Operational
CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Demolition Demolition 1/1/2022 1/31/2022 5 21
2 Grading Grading 2/1/2022 8/1/2022 5 130
3 Building Construction Building Construction 6/1/2022 3/1/2024 5 458 4 Architectural Coating Architectural Coating 1/1/2024 3/1/2024 5 45 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Grading Excavators 2 8.00 158 0.38
Demolition Concrete/Industrial Saws 1 8.00 81 0.73
Grading Concrete/Industrial Saws 1 8.00 81 0.73
Demolition Excavators 1 8.00 158 0.38
Demolition Off-Highway Trucks 1 8.00 402 0.38
Demolition Other Construction Equipment 3 8.00 172 0.42 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction

0.30 5.76 2.93 5.31 16.21 0.11 7.41 16.21 0.10 3.03 0.00 11.82 10.74 1.36 0.46 10.65 Residential Indoor: 170,100; Residential Outdoor: 56,700; Non-Residential Indoor: 11,250; Non-Residential Outdoor: 3,750; Striped Parking Area: 4,680 (Architectural Coating ±sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0.74
Acres of Paving: 0
CalEEMod Version: CalEEMod.2016.3.2 Page 9 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter
Demolition Rough Terrain Forklifts 1 8.00 100 0.40
Demolition Rubber Tired Loaders 1 8.00 203 0.36
Demolition Signal Boards 2 8.00 6 0.82
Building Construction Forklifts 0 6.00 89 0.20
Grading Bore/Drill Rigs 1 8.00 221 0.50
Grading Off-Highway Trucks 2 8.00 402 0.38
Demolition Tractors/Loaders/Backhoes 1 6.00 97 0.37
Grading Other Construction Equipment 5 8.00 172 0.42
Grading Rough Terrain Forklifts 1 8.00 100 0.40
Grading Tractors/Loaders/Backhoes 1 6.00 97 0.37
Grading Rubber Tired Loaders 1 8.00 203 0.36
Grading Signal Boards 2 8.00 6 0.82
Building Construction Cranes 1 4.00 231 0.29
Demolition Rubber Tired Dozers 0 1.00 247 0.40
Grading Rubber Tired Dozers 0 1.00 247 0.40
Building Construction Concrete/Industrial Saws 1 8.00 81 0.73 Building Construction Other Construction Equipment 5 8.00 172 0.42 Building Construction Paving Equipment 1 7.00 132 0.36
Building Construction Rollers 1 7.00 80 0.38
Building Construction Rough Terrain Forklifts 1 6.00 100 0.40 Building Construction Rubber Tired Loaders 1 8.00 203 0.36 Building Construction Signal Boards 2 8.00 6 0.82
Building Construction Surfacing Equipment 2 8.00 263 0.30 Building Construction Tractors/Loaders/Backhoes 1 8.00 97 0.37 Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
CalEEMod Version: CalEEMod.2016.3.2 Page 10 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.1274 0.0000 0.1274 0.0193 0.0000 0.0193 0.0000 0.0000 Off-Road 2.8580 26.5180 28.4394 0.0566 1.2279 1.2279 1.1439 1.1439 5,430.634 2 5,430.634
2 1.5754 5,470.018
4 Total 2.8580 26.5180 28.4394 0.0566 0.1274 1.2279 1.3552 0.0193 1.1439 1.1632 5,430.634 2 5,430.634
2 1.5754 5,470.018
4 Unmitigated Construction On-Site

3.1 Mitigation Measures Construction
Use Alternative Fuel for Construction Equipment
Use Cleaner Engines for Construction Equipment
Use Soil Stabilizer
Replace Ground Cover
Water Exposed Area
Water Unpaved Roads
Reduce Vehicle Speed on Unpaved Roads
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Demolition 11 28.00 0.00 12.00 14.70 6.90 13.00 LD_Mix HDT_Mix HHDT Grading 16 40.00 0.00 5,688.00 14.70 6.90 13.00 LD_Mix HDT_Mix HHDT Building Construction 16 96.00 23.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 19.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Page 11 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 3.0800e0030.1074 0.0252 2.9000e0046.4900e0032.7000e0046.7600e0031.7800e0032.6000e0042.0400e00331.9788 31.9788 2.5800e00332.0434 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1215 0.0758 0.8785 2.8100e0030.3130 2.2500e0030.3152 0.0830 2.0700e0030.0851 280.2741 280.2741 7.0600e003280.4506 Total 0.1245 0.1832 0.9037 3.1000e0030.3195 2.5200e0030.3220 0.0848 2.3300e0030.0871 312.2529 312.2529 9.6400e003312.4940 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.0422 0.0000 0.0422 6.3900e0030.0000 6.3900e0030.0000 0.0000 Off-Road 0.8718 17.7889 22.4996 0.0566 0.8960 0.8960 0.8960 0.8960 0.0000 3,537.013 2 3,537.013
2 0.9846 3,561.628
0 Total 0.8718 17.7889 22.4996 0.0566 0.0422 0.8960 0.9382 6.3900e0030.8960 0.9023 0.0000 3,537.013 2 3,537.013
2 0.9846 3,561.628
0 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 12 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.2 Demolition - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 3.0800e0030.1074 0.0252 2.9000e0046.4900e0032.7000e0046.7600e0031.7800e0032.6000e0042.0400e00331.9788 31.9788 2.5800e00332.0434 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1215 0.0758 0.8785 2.8100e0030.3130 2.2500e0030.3152 0.0830 2.0700e0030.0851 280.2741 280.2741 7.0600e003280.4506 Total 0.1245 0.1832 0.9037 3.1000e0030.3195 2.5200e0030.3220 0.0848 2.3300e0030.0871 312.2529 312.2529 9.6400e003312.4940 Mitigated Construction Off-Site

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.0456 0.0000 0.0456 6.6500e0030.0000 6.6500e0030.0000 0.0000 Off-Road 4.5649 42.2054 45.1350 0.0968 1.9306 1.9306 1.7904 1.7904 9,319.858 1 9,319.858
1 2.8332 9,390.688
7 Total 4.5649 42.2054 45.1350 0.0968 0.0456 1.9306 1.9762 6.6500e0031.7904 1.7970 9,319.858 1 9,319.858
1 2.8332 9,390.688
7 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 13 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.2358 8.2240 1.9318 0.0225 0.4971 0.0208 0.5178 0.1362 0.0199 0.1561 2,448.594 7 2,448.594
7 0.1978 2,453.540
0 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1735 0.1083 1.2550 4.0200e0030.4471 3.2100e0030.4503 0.1186 2.9600e0030.1215 400.3915 400.3915 0.0101 400.6437 Total 0.4093 8.3323 3.1868 0.0265 0.9442 0.0240 0.9682 0.2548 0.0228 0.2776 2,848.986 2 2,848.986
2 0.2079 2,854.183
7 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 0.0151 0.0000 0.0151 2.2000e0030.0000 2.2000e0030.0000 0.0000 Off-Road 1.5561 31.0176 38.4897 0.0968 1.4231 1.4231 1.4231 1.4231 0.0000 6,229.574 6 6,229.574
6 1.8554 6,275.960
1 Total 1.5561 31.0176 38.4897 0.0968 0.0151 1.4231 1.4383 2.2000e0031.4231 1.4253 0.0000 6,229.574 6 6,229.574
6 1.8554 6,275.960
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 14 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.3 Grading - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.2358 8.2240 1.9318 0.0225 0.4971 0.0208 0.5178 0.1362 0.0199 0.1561 2,448.594 7 2,448.594
7 0.1978 2,453.540
0 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1735 0.1083 1.2550 4.0200e0030.4471 3.2100e0030.4503 0.1186 2.9600e0030.1215 400.3915 400.3915 0.0101 400.6437 Total 0.4093 8.3323 3.1868 0.0265 0.9442 0.0240 0.9682 0.2548 0.0228 0.2776 2,848.986 2 2,848.986
2 0.2079 2,854.183
7 Mitigated Construction Off-Site

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 3.7484 37.8633 37.8849 0.0728 1.8117 1.8117 1.6810 1.6810 6,996.608 1 6,996.608
1 2.0818 7,048.654
0 Total 3.7484 37.8633 37.8849 0.0728 1.8117 1.8117 1.6810 1.6810 6,996.608 1 6,996.608
1 2.0818 7,048.654
0 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 15 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0638 2.0857 0.5631 5.6100e0030.1472 4.0400e0030.1512 0.0424 3.8600e0030.0462 600.3509 600.3509 0.0397 601.3436 Worker 0.4164 0.2599 3.0119 9.6400e0031.0731 7.7100e0031.0808 0.2846 7.1000e0030.2917 960.9397 960.9397 0.0242 961.5450 Total 0.4802 2.3457 3.5750 0.0153 1.2202 0.0118 1.2320 0.3270 0.0110 0.3379 1,561.290 5 1,561.290
5 0.0639 1,562.888
5 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.909 4 3,626.909
4 1.0137 3,652.2511
Total 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.909 4 3,626.909
4 1.0137 3,652.251
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.4 Building Construction - 2022
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0638 2.0857 0.5631 5.6100e0030.1472 4.0400e0030.1512 0.0424 3.8600e0030.0462 600.3509 600.3509 0.0397 601.3436 Worker 0.4164 0.2599 3.0119 9.6400e0031.0731 7.7100e0031.0808 0.2846 7.1000e0030.2917 960.9397 960.9397 0.0242 961.5450 Total 0.4802 2.3457 3.5750 0.0153 1.2202 0.0118 1.2320 0.3270 0.0110 0.3379 1,561.290 5 1,561.290
5 0.0639 1,562.888
5 Mitigated Construction Off-Site

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 3.5173 34.5577 37.7416 0.0728 1.6296 1.6296 1.5118 1.5118 6,996.110 7 6,996.110
7 2.0786 7,048.074
3 Total 3.5173 34.5577 37.7416 0.0728 1.6296 1.6296 1.5118 1.5118 6,996.110 7 6,996.110
7 2.0786 7,048.074
3 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 17 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0474 1.5687 0.4994 5.4300e0030.1472 1.9000e0030.1491 0.0424 1.8100e0030.0442 581.9693 581.9693 0.0349 582.8409 Worker 0.3927 0.2351 2.7761 9.2800e0031.0731 7.5100e0031.0806 0.2846 6.9200e0030.2915 925.1449 925.1449 0.0218 925.6903 Total 0.4401 1.8038 3.2754 0.0147 1.2202 9.4100e0031.2296 0.3270 8.7300e0030.3357 1,507.114 1 1,507.114
1 0.0567 1,508.531
2 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.765 6 3,626.765
6 1.0105 3,652.027
9 Total 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.765 6 3,626.765
6 1.0105 3,652.027
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 18 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.4 Building Construction - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0474 1.5687 0.4994 5.4300e0030.1472 1.9000e0030.1491 0.0424 1.8100e0030.0442 581.9693 581.9693 0.0349 582.8409 Worker 0.3927 0.2351 2.7761 9.2800e0031.0731 7.5100e0031.0806 0.2846 6.9200e0030.2915 925.1449 925.1449 0.0218 925.6903 Total 0.4401 1.8038 3.2754 0.0147 1.2202 9.4100e0031.2296 0.3270 8.7300e0030.3357 1,507.114 1 1,507.114
1 0.0567 1,508.531
2 Mitigated Construction Off-Site

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 3.3717 32.4842 37.7690 0.0728 1.5043 1.5043 1.3951 1.3951 6,995.802 2 6,995.802
2 2.0774 7,047.737
3 Total 3.3717 32.4842 37.7690 0.0728 1.5043 1.5043 1.3951 1.3951 6,995.802 2 6,995.802
2 2.0774 7,047.737
3 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 19 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0463 1.5651 0.4852 5.4100e0030.1472 1.8700e0030.1490 0.0424 1.7900e0030.0442 579.9498 579.9498 0.0343 580.8079 Worker 0.3728 0.2142 2.5876 8.9700e0031.0731 7.4100e0031.0805 0.2846 6.8200e0030.2914 894.5688 894.5688 0.0200 895.0680 Total 0.4191 1.7792 3.0728 0.0144 1.2202 9.2800e0031.2295 0.3270 8.6100e0030.3356 1,474.518 6 1,474.518
6 0.0543 1,475.876
0 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.548 6 3,626.548
6 1.0094 3,651.783
0 Total 0.8975 18.4756 23.1949 0.0728 0.9539 0.9539 0.9539 0.9539 0.0000 3,626.548 6 3,626.548
6 1.0094 3,651.783
0 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 20 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.4 Building Construction - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0463 1.5651 0.4852 5.4100e0030.1472 1.8700e0030.1490 0.0424 1.7900e0030.0442 579.9498 579.9498 0.0343 580.8079 Worker 0.3728 0.2142 2.5876 8.9700e0031.0731 7.4100e0031.0805 0.2846 6.8200e0030.2914 894.5688 894.5688 0.0200 895.0680 Total 0.4191 1.7792 3.0728 0.0144 1.2202 9.2800e0031.2295 0.3270 8.6100e0030.3356 1,474.518 6 1,474.518
6 0.0543 1,475.876
0 Mitigated Construction Off-Site

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 13.7072 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 13.8880 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 21 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0738 0.0424 0.5121 1.7800e0030.2124 1.4700e0030.2138 0.0563 1.3500e0030.0577 177.0501 177.0501 3.9500e003177.1489 Total 0.0738 0.0424 0.5121 1.7800e0030.2124 1.4700e0030.2138 0.0563 1.3500e0030.0577 177.0501 177.0501 3.9500e003177.1489 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 13.7072 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e0030.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.8443 Total 13.7667 1.3570 1.8324 2.9700e0030.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0159 281.8443 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 22 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

4.0 Operational Detail - Mobile

4.1 Mitigation Measures Mobile
Increase Transit Accessibility

3.5 Architectural Coating - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0738 0.0424 0.5121 1.7800e0030.2124 1.4700e0030.2138 0.0563 1.3500e0030.0577 177.0501 177.0501 3.9500e003177.1489 Total 0.0738 0.0424 0.5121 1.7800e0030.2124 1.4700e0030.2138 0.0563 1.3500e0030.0577 177.0501 177.0501 3.9500e003177.1489 Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2 Page 23 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 1.1050 4.9722 12.7188 0.0497 4.5250 0.0373 4.5623 1.2105 0.0347 1.2451 5,069.367 7 5,069.367
7 0.2391 5,075.344
0 Unmitigated 1.1798 5.3896 14.6029 0.0586 5.4007 0.0435 5.4443 1.4447 0.0405 1.4852 5,977.168 4 5,977.168
4 0.2746 5,984.033
3 4.2 Trip Summary Information

4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Apartments Mid Rise 558.60 536.76 492.24 1,865,765 1,563,250 Enclosed Parking with Elevator 0.00 0.00 0.00
Strip Mall 332.40 315.30 153.23 579,075 485,184
Total 891.00 852.06 645.47 2,444,840 2,048,434
Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Apartments Mid Rise 14.70 5.90 8.70 40.20 19.20 40.60 86 11 3 Enclosed Parking with Elevator 16.60 8.40 6.90 0.00 0.00 0.00 0 0 0 Strip Mall 16.60 8.40 6.90 16.60 64.40 19.00 45 40 15

4.4 Fleet Mix
CalEEMod Version: CalEEMod.2016.3.2 Page 24 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas
Mitigated

0.0263 0.2246 0.0968 1.4300e0030.0182 0.0182 0.0182 0.0182 286.5131 286.5131 5.4900e0035.2500e003288.2157 NaturalGas
Unmitigated

0.0276 0.2361 0.1019 1.5100e0030.0191 0.0191 0.0191 0.0191 301.1981 301.1981 5.7700e0035.5200e003302.9880

5.1 Mitigation Measures Energy
Exceed Title 24
Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Mid Rise 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Enclosed Parking with Elevator 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Strip Mall 0.553363 0.042540 0.203692 0.115607 0.014606 0.005830 0.021800 0.032323 0.002120 0.001725 0.004837 0.000711 0.000846 Historical Energy Use: N
CalEEMod Version: CalEEMod.2016.3.2 Page 25 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

6.0 Area Detail

5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments Mid
Rise
2526.49 0.0273 0.2328 0.0991 1.4900e0030.0188 0.0188 0.0188 0.0188 297.2336 297.2336 5.7000e0035.4500e003298.9999 Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Strip Mall 33.6986 3.6000e0043.3000e0032.7800e0032.0000e0052.5000e0042.5000e0042.5000e0042.5000e0043.9645 3.9645 8.0000e0057.0000e0053.9881 Total 0.0276 0.2361 0.1019 1.5100e0030.0191 0.0191 0.0191 0.0191 301.1981 301.1981 5.7800e0035.5200e003302.9880 Unmitigated
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Apartments Mid
Rise

2.40433 0.0259 0.2216 0.0943 1.4100e0030.0179 0.0179 0.0179 0.0179 282.8627 282.8627 5.4200e0035.1900e003284.5436 Enclosed Parking
with Elevator
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Strip Mall 0.0310284 3.3000e0043.0400e0032.5600e0032.0000e0052.3000e0042.3000e0042.3000e0042.3000e0043.6504 3.6504 7.0000e0057.0000e0053.6721 Total 0.0263 0.2246 0.0969 1.4300e0030.0181 0.0181 0.0181 0.0181 286.5131 286.5131 5.4900e0035.2600e003288.2157 Mitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 26 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

6.1 Mitigation Measures Area

6.0 Area Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.3439 2.3585 0.0534 2,386.221
7 Unmitigated 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.3439 2.3585 0.0534 2,386.221
7 CalEEMod Version: CalEEMod.2016.3.2 Page 27 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating

0.1690 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products

1.8393 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 22.0110 1.7429 42.7184 0.1090 6.4166 6.4166 6.4166 6.4166 786.8212 1,512.000 0 2,298.821
2 2.3465 0.0534 2,373.396
8 Landscaping 0.2102 0.0800 6.9478 3.7000e0040.0385 0.0385 0.0385 0.0385 12.5227 12.5227 0.0121 12.8249 Total 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.343
9 2.3585 0.0534 2,386.221
7 Unmitigated
CalEEMod Version: CalEEMod.2016.3.2 Page 28 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

8.1 Mitigation Measures Waste
Institute Recycling and Composting Services
Use Water Efficient Landscaping

7.1 Mitigation Measures Water

7.0 Water Detail

8.0 Waste Detail

6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating

0.1690 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products

1.8393 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Hearth 22.0110 1.7429 42.7184 0.1090 6.4166 6.4166 6.4166 6.4166 786.8212 1,512.000 0 2,298.821
2 2.3465 0.0534 2,373.396
8 Landscaping 0.2102 0.0800 6.9478 3.7000e0040.0385 0.0385 0.0385 0.0385 12.5227 12.5227 0.0121 12.8249 Total 24.2295 1.8229 49.6662 0.1094 6.4551 6.4551 6.4551 6.4551 786.8212 1,524.522 7 2,311.343
9 2.3585 0.0534 2,386.221
7 Mitigated

9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Page 29 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

11.0 Vegetation

10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2016.3.2 Page 30 of 30 Date: 4/29/2020 5:41 PM 86 Fair Oaks - South Coast Air Basin, Winter

APPENDIX C
Biological Resources
Updated Tree Condition Letter
March 12, 2019
Linda Silverstein, Project Administrator
Goldrich Kest
5150 Overland Avenue
Culver City, California 90230
Re: 86 South Fair Oaks Avenue, Pasadena, California 91105 Dear Ms. Silverstein,
In June 2018, Carlberg Associates conducted a tree inventory on the property located at 86 South Fair Oaks Avenue in Pasadena. The existing parking lot is proposed to be demolished to accommodate a new mixeduse development. Carlberg prepared a tree inventory, tree location map, and Protected Tree Removal applications that were submitted to the City of Pasadena by the project architect, Architectural Resources Group (ARG), in September 2018.

It has come to our attention that Tree #24, a protected Indian laurel fig (Ficus microcarpa), failed from the root plate during one of the rain storms in January 2018. Photographs provided by ARG at the end of this letter illustrate the failure. I did not see the tree in its failed condition. In 2018, we noted fungal fruiting bodies on several of the structural roots. Based on the prior presence of fungal fruiting bodies and the nature of the failure, this tree failure appears to have occurred due to storm-related pressure on a significantly compromised root structure. These are natural causes and not related to any project-related activity.

It is my opinion that mitigation should not be required for the loss of this tree. Please feel welcome to contact me at our Sierra Madre office with questions. Thank you.

Sincerely,
Christy Cuba
ASCA Registered Consulting Arborist, #502
ISA Certified Arborist, WE-1982A
[email protected]
CC. Liz MacLean/ARG
Central Park Protected Tree Location Exhibit
M A R C H 1 2 , 2 0 1 9 / G O O D R I C H K E S T
P A G E 2 8 6 S O U T H F A I R O A K S , P A S A D E N A — T R E E F A I L U R E Exhibit A – Illustrating the location of Tree 24 on the Tree Location Map Not to Scale
M A R C H 1 2 , 2 0 1 9 / G O O D R I C H K E S T
P A G E 3 8 6 S O U T H F A I R O A K S , P A S A D E N A — T R E E F A I L U R E Above – Facing north - Illustrating Tree 24 in July 2017 Below – Illustrating some of the fungal fruiting bodies on the roots M A R C H 1 2 , 2 0 1 9 / G O O D R I C H K E S T
P A G E 4 8 6 S O U T H F A I R O A K S , P A S A D E N A — T R E E F A I L U R E Above and Below - Illustrating Tree 24 after the failure in January 2018 .

M A R C H 1 2 , 2 0 1 9 / G O O D R I C H K E S T
P A G E 5 8 6 S O U T H F A I R O A K S , P A S A D E N A — T R E E F A I L U R E Illustrating Tree 24 after the failure in January 2018
.

TREE INVENTORY LEGEND City of Pasadena Protected Tree Protected Tree Canopy Inventoried Non-Protected Tree #
#
Note: Inventoried trees plotted outside property line boundaries are designated "OS" for off-site and "ST" for city street trees ST1
ST2
ST3
ST4
ST5
ST6
ST7
ST8
12 13 14
16 15 17
18 19
20 26
23 24
31 35
38 21
22 25
27 28 29 30 32 33 34 36
37 Central Park Tree Inventory
May 2018 TREE INVENTORY 86 South Fair Oaks Ave. Pasadena Tree
ID Common Name / Botanical Name DBH / BT Ht. Height Spread (N/E/S/W) Health Grade Structure Grade Comments Disposition Protected Y/N ST1 Crape myrtle/ Lagerstroemia indica 3 20 4/4/5/4 B B tree well, sparse interior Retain City right-of-wayST2 Crape myrtle/ Lagerstroemia indica 3 15 6/6/5/3 A A tree well, minor basal damage Retain City right-of-wayST3 Crape myrtle/ Lagerstroemia indica 2 13 4/4/5/5 A- B planted low, dry Retain City right-of-wayST4 Crape myrtle/ Lagerstroemia indica 1 10 2/2/2/2 F F dead Retain City right-of-wayST5 Crape myrtle/ Lagerstroemia indica 1 10 1/1/1/1 B B codominant stems at 6 feet Retain City right-of-wayST6 Crape myrtle/ Lagerstroemia indica stump sprouts 4 2/2/2/2 A- C powdery mildew Retain City right-of-way ST7 Queen palm/ Syagrus romanzoffiana 20' BT* 30 10/10/10/10 A A Remove City right-of-way ST8 Queen palm/ Syagrus romanzoffiana 15' BT 20 7/7/7/7 A B shaded by phoenix canariensis to north Remove City right-of-way 12 Tree of Heaven/ Ailanthus altissima 8.5 30 10/12/14/20 A B codominant stems, concrete all around Remove No 13 Mexican fan palm/ Washingtonia robusta 50' BT 58 10/10/10/10 A A old tags 71, 38 Remove No 14 Mexican fan palm/ Washingtonia robusta 65' BT 73 8/8/8/8 A A Remove No 15 Canary Island pine/ Pinus canariensis 21 80 8/8/12/12 B B topped (laterals), shaded on west by other, epicormic growth Remove No
16 Canary Island pine/ Pinus canariensis 18.5 75 12/12/12/13 A B- topped (laterals), shaded on east by other, epicormic growth Remove No
17 Mexican fan palm/ Washingtonia robusta 42' BT 50 8/8/8/8 A A Remove No 18 Camphor/ Cinnamomum camphora 19, 21, 31 45 15/21/25/15 B C multiple pruning events, topped, epicormic, history of breakage, mechanical damage, good Remove Yes 19 Camphor/ Cinnamomum camphora 16, 16.5 45 12/18/15/20 B B multiple pruning events, codominant stems, epicormic, twig dieback, old mechanical damage Remove Yes 20 Camphor/ Cinnamomum camphora 18.5, 23.5 45 15/21/21/30 B B multiple pruning events, epicormic, twig dieback, old mechanical damage, history of breakage Remove Yes 21 Chinese elm/ Ulmus parvifolia 15 25 9/12/20/12 B C old tag 10, 2 trunks, anthracnose at base, mechanical damage, lost a codominant stem at Remove No 22 Mexican fan palm/ Washingtonia robusta 50' BT 57 7/7/7/7 A A- woodpeckers, old tags 235 and 77 Remove No 23 California fan palm/ Washingtonia filifera 45' BT 55 10/10/10/10 A A- woodpeckers, spiked, old tag 11 Relocate Yes 24 Indian laurel fig/ Ficus microcarpa 40.5 at 4 ft 45 30/15/18/27 B C white fungi on roots at all sides (only on bark), old tags 12 and 55 Remove Yes 25 Mexican fan palm/ Washingtonia robusta 50' BT 58 8/8/8/8 A A old tags 27 and 78, curved trunk Remove No May 2018 TREE INVENTORY 86 South Fair Oaks Ave. Pasadena Tree
ID Common Name / Botanical Name DBH / BT Ht. Height Spread (N/E/S/W) Health Grade Structure Grade Comments Disposition Protected Y/N 26 Canary Island date palm/ Phoenix canariensis 50' BT 58 10/10/10/10 A A old tags 13 and 65 Remove Yes 27 Mexican fan palm/ Washingtonia robusta 55' BT 62 8/8/8/8 A A spiked, old tag 29, woodpeckers Remove No 28 Mexican fan palm/ Washingtonia robusta 55' BT 62 8/8/8/8 A A curved trunk, old tag 30, woodpeckers Remove No 29 Mexican fan palm/ Washingtonia robusta 60' BT 68 8/8/8/8 A A old tag 31, woodpeckers in skinned part Remove No 30 Southern Magnolia/ Magnolia
grandiflora 15 30 10/10/8/12 B B old tag 82, multiple pruning events, root pruned on westside 2ft Remove No 31 California fan palm/ Washingtonia filifera 50' BT 60 8/8/8/8 A B old tag 6 and 53, eroded trunk on south and west, spiked, mechanical damage on trunk Relocate Yes 32 Hollywood juniper/ Juniperus chinensis 'Torulosa' 5, 8, 10 30 4/12/9/6 A- A- codominant stems, minor dieback, old tags 34 and 74 Remain No 33 Hollywood juniper/ Juniperus chinensis 'Torulosa' 13 30 3/10/10/12 A- A minor dieback, old tag 75 Remain No 34 Hollywood juniper/ Juniperus chinensis 'Torulosa' 10 25 3/5/9/12 A B- old tag 32, leans southwest, cable imbedded (trunk and branch) Remain No 35 Camphor/ Cinnamomum camphora 24 45 21/12/12/24 B B- topped laterals and top, multiple pruning events, old pruning callus is good, old tags 7 and 68 Remain Yes 36 Victorian box/ Pittosporum undulatum 10 28 1/6/10/10 C C- old tags 8 and 83, canker on southwest, topped, epicormic shoots Remain No 37 Weeping fig/ Ficus benjamina 2, 4, 6 30 14/15/14/10 A B potted plant escapee, shaded out Remain No38 Canary Island date palm/ Phoenix canariensis 20' BT 30 15/15/15/15 A A old tag 67 Retain Yes Tree Aging Report

MEMORANDUM
To: Kristopher Forsythe 8 Mills Place, Suite 300
Goldrich and Kest Industries, LLC Pasadena
5150 Overland Ave. California
Culver City, CA 90230 91105
626.583.1401
Project: 86 South Fair Oaks, Hotel Green Apartments fax 626.583.1414 Project No.: 09190 www.arg-la.com
Date: June 7, 2013
Phone: (310) 204-2050 x 217
Fax: (310) 280-5770
Via: e-mail: [email protected]
Remarks:

ARG has reviewed the findings of the draft Tree Aging study by Jan C. Scow Consulting Arborists, LLC dated June 3, 2013. The study was commissioned by Goldrich & Kest Industries in order to provide an assessment of the ages of the trees on the Hotel Green Apartments project site, which lies within the historic property of the Hotel Green. As a part of this review, ARG examined historic photos in our research collection about the site with special attention to the project site. We reviewed the findings of the study and compared it to what we know about the historic character of the project site. We also estimated a period of significance for the historic Hotel Green property based on our prior research in order to put the estimated ages of the trees in the context of the project site’s historical period.

No period of significance has yet been determined for the property. The National Register nomination was written before this became an obligatory part of a nomination. Our historic context report didn’t make a call either. However, based on our research the period would begin in 1899 with the opening of the “West Annex,” now the Castle Green. We believe that most qualified interpreters would place the end of the period of significance at end of the resort hotel era. We would argue for 1924, the year that the Castle Green became individually-owned apartment units and was no longer a hotel; this was presumably the year that the property was subdivided, though the date on the subdivision map we have is not legible. Trees that are more than 85 years old would then fall within the period of significance.

This age category would include six trees from the study’s list:
5 Camphor 90-110 years old
13 Canary Island Date Palm 100-110 years old
11 California Fan Palm 75-85 years old
6 California Fan Palm 75-85 years old
35 Mexican Fan Palm 75-95 years old
37 Mexican Fan Palm 80-90 years old

MEMORANDUM

Page 2 of 4 ends
← All documents from this meeting