Rose Bowl StadiumStrategic Plan – Summary Presentation June 6, 2022 Rose Bowl Operating Company
I.Introduction II.Financial OverviewIII.Capital Needs AssessmentIV.Market Overview V.Revenue Enhancement OpportunitiesVI.Ancillary Options VII.Revenue Opportunities SummaryVIII.Community ProgrammingIX.Economic ImpactX.Recommended Next StepsAppendix A – Naming RightsAppendix B – Athletic FieldsAppendix C – Revenue Enhancement Opportunities Presentation Outline
RBOC recognizes the iconic nature of the Rose Bowl and understands its role as managers of one the City’s most treasured assetsCity owns one of the world’s most iconic stadiums – 100-year old National Historic Landmark and a California Historic Civil Engineering Landmark – a source of community pride and significant economic impact locally and regionally Primary mission of the RBOC is to “return economic and civic value to the City of Pasadena by managing a world-class stadium and a professional quality golf course complex in a residential open-space environment” As the RBOC faces unprecedented challenges resulting from COVID-19, as well as increased competition in the regional and national markets, consideration must be given to potential opportunities to limit / minimize the financial impacts on theCity, while also allowing for the continued operation of one of the world’s most iconic venues, the Rose Bowl StadiumRBOC leadership and staff, with the support of leading sports industry specialists, have extensively studied the current situation, assessed the physical condition of the stadium, and developed a strategic plan and potential options for the City to consider to address current and future needs of the stadium OverviewI. Introduction
Continue to host national and international events that will generate direct and indirect economic impacts and enhance the Pasadena brandPrioritize community events and activities, as well as neighborhood relationsOperate the stadium and golf course in a fiscally responsible manner to meet its current and future financial obligations:Operating budgetDebt serviceCapital needs (prioritize safety and code issues)Work closely with existing partners to identify opportunities to enhance operations and meet the objectives aboveContinue to support Legacy Foundation fundraising effortsIdentify potential third-party partners for fundingSeek to collaborate more with PCOCAssess economic impact from RBOC activitiesMinimize general fund requests Strategic Plan – Key Objectives I. Introduction
Prior to COVID-19 pandemic, RBOC operated at a profit before and after debt service, preventative maintenance, and scheduled capital expensesIn FY2021 and FY2022, City support was required to meet debt service obligationsNote: Figures do not include major capital repairs/replacementHistorical Financial PerformanceII. Financial OverviewFY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2017-2021Actuals Actuals Actuals Actuals Actuals TotalStadium Net Income / (Loss) $12,292,120 $12,313,312 $9,298,142 $6,935,971($2,080,275)$38,759,271Golf Net Income / (Loss) $1,459,549 $1,241,929 $1,416,242 $891,856 $1,888,698 $6,898,273Net Income / (Loss) Before Debt Service, PM, and CapEx $13,751,669 $13,555,241 $10,714,384 $7,827,827($191,577)$45,657,544Preventative Maintenance and CapEx($724,000) ($766,905)$0 $0($1,880,124) ($3,371,029)Debt Service (Net of Subsidies)($9,941,461) ($9,668,927) ($10,378,131) ($10,946,851) ($11,448,307) ($52,383,676)City Contribution to Debt Service $0 $0 $0 $0 $11,448,307 $11,448,307Net Income / (Loss) $3,086,208 $3,119,409 $336,253($3,119,024) ($2,071,701)$1,351,146
RBOC staff has developed a comprehensive 5-year pro formaRBOC proforma has been reviewed by CAA ICON as an independent third-partyRBOC is estimated to operate at a profit before debt service, preventative maintenance, and capital expensesAfter debt service, preventative maintenance, and capital expenses, RBOC is estimated to operate at a net lossNote: These figures do not include capital major repairs/replacement (see Section III)5-Year ProformaII. Financial OverviewFY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 FY 2023-2027Forecast Pro-Forma Pro-Forma Pro-Forma Pro-Forma Pro-Forma TotalStadium Net Income / (Loss) $3,945,400 $7,109,347 $6,406,208 $6,152,951 $6,146,404 $5,484,363 $31,299,274Golf Net Income / (Loss) $2,564,521 $2,395,936 $2,651,594 $2,761,933 $2,796,699 $2,841,690 $13,447,852Net Income / (Loss) Before Debt Service, PM, and CapEx $6,509,921 $9,505,283 $9,057,802 $8,914,884 $8,943,104 $8,326,053 $44,747,126Preventative Maintenance and CapEx($681,135) ($1,804,110) ($1,894,289) ($1,941,152) ($1,989,423) ($2,039,140) ($9,668,114)Debt Service (Net of Subsidies)($11,960,717) ($12,306,340) ($12,712,815) ($13,116,184) ($13,520,880) ($13,930,779) ($65,586,998)City Contribution to Debt Service $9,434,093 $0 $0 $0 $0 $0 $0Net Income / (Loss) $3,302,163($4,605,166) ($5,549,302) ($6,142,452) ($6,567,199) ($7,643,866) ($30,507,986)
The estimated annual support required by the RBOC to meet operating (and debt service) needs through FY 2027 is summarized belowTotal support needed through FY 2027 is estimated at approximately $19.4 million, commencing in FY 2025 Operating Reserve BalanceII. Financial OverviewFY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027Forecast Pro-Forma Pro-Forma Pro-Forma Pro-Forma Pro-FormaOperating Reserve Balance - Beginning $12,584,399 $12,386,562 $6,534,179 $984,877($5,157,575) ($11,724,775)Net Income / (Loss) $3,302,163($4,605,166) ($5,549,302) ($6,142,452) ($6,567,199) ($7,643,866)Less: RBOC Reserve Policy($3,500,000) ($1,247,217)$0 $0 $0 $0Operating Reserve Balance - Ending $12,386,562 $6,534,179 $984,877($5,157,575) ($11,724,775) ($19,368,641)
RBOC engaged industry experts to complete a comprehensive capital needs assessmentAssessment was conducted by the following industry leading consultants (“Consulting Team”)CAA ICON – Project ManagerGensler – ArchitecturalMagnusson Klemencic Associates – StructuralME-Engineers – Mechanical, Electrical, Plumbing, and Fire ProtectionDuray – FoodserviceMillennium Sports – Turf ConsultantIconic Data – AV/Technology ConsultantAssessment began in February 2022 and completed in May 2022The Consulting Team recommended upgrades and corrective work that is typical of a publicly owned stadium that is 100-years old Capital NeedsIII. Capital Needs Assessment
Based on the assessment provided by the Consulting Team, RBOC staff has identified the follow improvements to be made over the next six (6) years (FY 2023 through FY 2028) – includes essential code-compliant and safety items RBOC has identified $11.1 million of capital needs in FY 2023$8.1 million has been allocated in the FY 2023 CIP budget, leaving $45.6 million to be funded Capital NeedsIII. Capital Needs AssessmentCapital Needs($Millions)IT $3.5Utilities $6.2Vertical Circulation $2.0Food and Beverage $1.0Concrete Overlay and Repair $11.0Structural $9.3Seating $20.5Other $0.2Total $53.7Note: Does not include contingency, soft costs, etc.
ITFiber upgradesSwitch upgradesWAP upgrades UtilitiesWaterGas PlumbingTelecomWasteVertical CirculationElevators EscalatorsFood and BeverageHealth code compliance upgrades Concrete Overlay and RepairUnderside of south endEntire bowl seating area patch and repairStructuralUpgrading, improving old structural footings and other areas up to new code complianceStructural ballast improvementsSeatingPink seat replacementsBench seat replacementsOtherSignage / directional for life safety way finding Environmental items Capital Needs (Summary of Items)III. Capital Needs Assessment
IV. Market OverviewIn 2020, CAA ICON was engaged to evaluate industry and market trends and competitive landscape on a national and regional basisCompetition from local and regional facilities is a significant issueNumber of events / attendance (concerts / soccer matches)Premium seating Advertising / sponsorshipImpact of deal terms on rental rates and profit margins for other events such as concerts (more competition is better for the artist / worse for the stadium) Competition from national facilities should also be considered – particularly related to major events Examples: Allegiant Stadium, AT&T Stadium, Levi’s Stadium, Mercedes-Benz Stadium, U.S. Bank StadiumCompetitive Facilities
The characteristics of local competitive venues are summarized belowEach venue’s competitive basis (patrons / events / sponsorships) is characterized as it relates to the Rose BowlThe Los Angeles market has significant competition for patron / household expenditures, events, and sponsorships / corporate expendituresLocal Competitive FacilitiesIV. Market OverviewFacilityYear Built Owner Operator CapacityLuxury SuitesLoge BoxesClub Seats Tenant(s)Rose Bowl 2014 (R) City of Pasadena Rose Bowl Operating Co. 91,136 54 48 1,180 NCAALos Angeles Memorial Coliseum 2019 (R) LAMCC University of Southern California 77,500 46 24 1,090 NCAA, NFLHigh High HighSoFi Stadium 2020 Kroenke Sports & Entertainment Kroenke Sports & Entertainment 70,240 274 TBC 10,820 NFLHigh High HighDodger Stadium 2020 (R) Guggenheim Baseball Management Guggenheim Baseball Management 56,000 68 8 2,500 MLBHighMidHighAngel Stadium of Anaheim 1998 (R) City of Anaheim Los Angeles Angels 45,050 81 37 5,075 MLBLow Low LowDignity Health Sports Park 2003 AEG AEG 27,000 42 6 1,500 MLS, NFLMidLowMidBanc of California Stadium 2018 Los Angeles FC Los Angeles FC 22,000 35 49 1,974 MLSMidLowMidCrypto.com Arena 1999 AEG AEG 20,000 171 27 2,500 NBA, NHL, WNBAMidLowMidIntuit Dome 2024 Los Angeles Clippers Los Angeles Clippers 18,500 TBC TBC TBC NBAMidLowMidKia Forum - (1) 2014 (R) Los Angeles Clippers Los Angeles Clippers 17,500 0 13 300 NAMidLowMidHonda Center 1993 City of Anaheim Anaheim Arena Management 17,147 88 0 1,750 NHLLow Low LowMinimum 17,147 0 0 300Average 42,007 86 24 2,869Maximum 91,136 274 49 10,820Note: (R) indicates renovation.Source: Industry research. Competitive BasisPatrons / Household ExpendituresSponsorships / Corporate ExpendituresEvents(1) - In March 2020, Steve Ballmer and the Los Angeles Clippers purchased The Forum from Madison Square Garden Company (MSG) for a reported $400 million, which resolved litigation between the two parties.
In 2020, CAA ICON compiled 15 case studies on “comparable” situations / stadiumsThe table below summarizes the type and amount (if available) of subsidy provided to each of the comparable stadiumsAs of 2020, the Rose Bowl was the only facility that was currently not receiving an operating or construction / renovation subsidy – golf course operation not considered a subsidy in comparison to direct subsidies provided to comparables“Comparable” FacilitiesIV. Market OverviewOwner OperatingConstruction / Renovation Operating CommentsRose Bowl Stadium City of Pasadena No No No No Renovation Golf Course Part of RBOC Operation/ OversightCotton Bowl City of Dallas Yes Yes NA $30,000,000 Renovation Part of Fair Park ComplexSDDCU Stadium City of San Diego Yes Yes $4,400,000 $92,200,000 Renovation Renovated for NFL ($4.7m Annual Debt Service)Legion Field City of Birmingham Yes Yes $1,000,000 $1,000,000 RenovationMontreal Olympic Stadium Government of Quebec Yes Yes NA $250,000,000 Renovation - (1) Part of Parc Olympique ComplexThe Dome at America's Center St. Louis Regional Sports Authority NA Yes NA $280,000,000 New Construction Constructed for NFLAlamodome City of San Antonio Yes Yes $3,000,000 $85,000,000 Renovation Two ProjectsCamping World Stadium City of Orlando Yes Yes $580,000 $267,700,000 Renovation Two ProjectsSimmons Bank Liberty Stadium City of Memphis Yes Yes NA NA NA City/University Announced $200m RenovationWar Memorial Stadium State of Arkansas Yes Yes $800,000 $2,100,000 RenovationIndependence Stadium City of Shreveport Yes Yes NA $32,000,000 RenovationAloha Stadium State of Hawaii Yes Yes $5,600,000 $71,000,000 Renovation Stadium to be ReplacedRFK Stadium District of Columbia Yes Yes Confidential $18,000,000 Renovation Renovation for MLBRentschler Stadium State of Connecticut Yes Yes $260,000 $91,200,000 New Construction Constructed for UConnLadd-Peebles Stadium City of Mobile NA Yes NA $2,200,000 Renovation(1) - Planned.Note: Los Angeles Memorial Coliseum not included.Type of Subsidy Amount of SubsidyConstruction / Renovation
In June 2021, CAA ICON, in collaboration with RBOC staff and RBOC Board Leadership, developed a comprehensive list of potential revenue opportunities in and around the Rose Bowl Stadium, including Brookside Golf Course and the ArroyoApproximately 130+ projects were initially identifiedThe goal of Phase 1 was to identify as many opportunities as possible, without regard to initial feasibility / viabilityInitial list of 130+ projects was shortened to 94 projects to exclude non-revenue generating opportunitiesThe output of Phase 1 resulted in the identification of potential projects for further study in Phase 212 projects were identified for further study in Phase 2Consideration was given to studies completed by Gensler, Jerde, Verde, Urban Land Institute (ULI), and othersOverviewV. Revenue Enhancement Opportunities
Opportunities were evaluated based on a number of key considerations, summarized in the following categories:Financial feasibilityLegal feasibilityPolitical / stakeholder feasibilityOperational feasibilityOtherAdditional considerations included, but were not limited to: Sustain revenue and event levels in competitive marketImproved fan experience (e.g., tread depth improvements / seat replacement)Address future necessary improvements (e.g., seat replacement / suite refresh / ADA needed improvements)Tenant relationship / agreementsDiversity, equity, and inclusion opportunities (programming / other opportunities)Community usage / needs (e.g., graduations)OtherIn some instances, certain opportunities were selected for further study despite presenting potential significant legal and /or political challenges, given the potential revenue generation OverviewV. Revenue Enhancement Opportunities
List of opportunities identifiedPhase 1 OpportunitiesV. Revenue Enhancement OpportunitiesA. Physical Modifications B. Ancillary Development OpportunitiesStadium: Traditional Real Estate Development:Premium Seating: 25 Residential1 Limited Suite Conversions (Gensler) 26 Commercial / Retail2 Sky Bar / Rooftop Opportunity 27 Hotel3 Bunker Suite 28 Destination-Based Development4 South Endzone (Gensler) Loge Boxes Arts and Entertainment:5 East Side Suites 29 Performing Arts Stage6 East Sideline Loge Platform (Gensler) Hall-of-Fame:Seating Bowl: 30 High School / California7 Capacity Reduction (Seat Replacement / Additional Aisles / Etc.) 31 Museum8 SRO Platforms (Gensler) 32 Holiday Light Show9 Concourse Extension (Food and Beverage Plaza) 33 Food Park (Jerde)New Spaces: Recreational:10 Esports (Community / LAN Gaming Center) 34 Ice Skating Rink11 Sports Betting Lounge 35 Amateur Sports Fields12 Lunch Club Pavilion / City Club Rose Bowl (Restaurant) 36 Accessible Park13 Pop-Up Soccer Stadium 37 Tennis Club / Additional CourtsRequirements for Potential New Events: Community:14 2028 Olympics 38 Wellness Center15 2026 World Cup (FIFA) 39 Physical Therapy Center16 Turf Conversion (Field Edge) 40 Wedding VenueParking Lot: 41 Community / Meeting / Classrooms / Multi-Purpose Center17 Turf Conversion (Shared Recreational Use)Golf Course:18 Redeveloped Club HouseNew Concepts:19 Driving Range Expansion 20 Mini Golf21 Membership ModelSustainability / Energy Efficiency Enhancements:22 Solar Farm / Panels23 Compost Facility (State)24 LEED Designation
List of opportunities identified (continued)Phase 1 OpportunitiesV. Revenue Enhancement OpportunitiesC. Naming Rights / Sponsorship Opportunities G. Financial / Capital SupportNaming Rights: City:42 Stadium 70 Direct Support43 Parking Lots / Tailgating 71 Redirect Sales / Hotel / Other Taxes44 Campus 72 Resources45 District 73 Services / Responsibility / Rates46 Stadium Amenities / Areas County:New Sponsorship Inventory: 74 Direct Support47 Interior 75 Redirect Sales / Hotel / Other Taxes48 Exterior State:49 Other 76 Direct SupportOff-Site Sponsorship: 77 Redirect Sales / Hotel / Other Taxes50 I-210 Signage Federal:51 Downtown Pasadena / Old Town Pasadena 78 Save America's Treasures52 TV Corner (Parade Route) 79 Shuttered Venue Operators Grant53 Other 80 Non-Profit Securities GrantD. Tenant / Partner / Stakeholder Contracts81 Urban Area Securities Initiatives54 UCLA Legacy Foundation:55 Tournament of Roses 82 Donor Recognition / Additional Fundraising56 Goldenvoice 83 Rose Bowl Institute57 IMG Other:58 Legends 84 LA Sports and Entertainment Commission59 TicketmasterH. Financing Options60 Levy 85 Debt Relief / Refinancing61 Other 86 Historic Tax CreditsE. Consolidate Operating Companies I. Sale / Lease62 Establish Pasadena Sports, Convention, & Hospitality Authority 87 Property / Stadium / Golf CourseF. Fiscal Opportunities88 Shareholder / Public Ownership ModelHotel Occupancy Tax:J. Event-Related Opportunities63 Hotel Occupancy Tax Increase 89 Ticketing Fees64 Hotel Occupancy Tax Rebate for Rose Bowl Events Parking Fees:Sales Tax: 90 Event Day Parking65 Sales Tax Increase 91 Non-Event Day Parking66 Sales Tax Rebate for Rose Bowl Events Personal Seat Licenses:67 New Years Day Grandstand Tax 92 UCLA68 Special Food and Beverage Tax Increase 93 Tournament of Roses69 Other Special Taxes (Sin, Utility, Earnings, Property / Parcel, etc.) 94 Concert Club Membership
Short-listed opportunities identified from Phase 11) Limited suite conversions – convert limited number of suites into loge clubs in pavilion 2) Sky bar / rooftop opportunity – develop sky bar to be located on the pavilion rooftop 3) South endzone project – develop south endzone club, seat modifications, and amphitheater set-up 4) Loge box seating project – convert limited seat inventory to loge box seating 5) Capacity reduction – seat replacement / additional aisles / etc.6) Performing arts stage / venue (amphitheater) – stand-along amphitheater adjacent to stadium 7) Ice skating rink – develop new ice complex with two indoor full-size ice sheets 8) Campus marquee / sponsorship program – additional sponsorship opportunities for a primary partner on campus9) Sponsorship I-210 / I-134 signage – rotational signage with highway visibility 10) Family golf – mini-golf and driving range improvements11) Athletic fields – convert portion of golf course to soccer, tennis, and track and field facility12) Establish Pasadena Sports, Convention and Hospitality Authority – consolidated operating companies (RBOC / PCOC) Phase 2 OpportunitiesV. Revenue Enhancement Opportunities
The following projects are expected to generate incremental revenue after debt serviceI-210 / I-134 signageCampus marquee / sponsorship programSouth endzone project (assumes significant modifications to tenant contracts – major assumption)Loge box seating (assumes significant modifications to tenant contracts – major assumption)Amphitheater Family golf[Athletics fields]The following projects are expected to break-even or fail to generate incremental revenue after debt serviceSky bar club Recreational ice rinkCapacity reductionLimited suite conversions Phase 2 OpportunitiesV. Revenue Enhancement Opportunities
In recent years, public and private sector stadium / arena owners and operators have developed small to large scale projects to redevelop surrounding areas and to fund capital and / or operating needs, among other reasonsExamples include, but are not limited to:The Battery Atlanta – Atlanta Braves Ballpark District – San Diego PadresMcGregor Square – Colorado RockiesDeer District – Milwaukee BucksDowntown Commons – Sacramento KingsICE District – Edmonton OilersTexas Live! – Texas Rangers / Dallas CowboysVictory Park (PNC Plaza) – Dallas Mavericks / Dallas Stars Wrigleyville Development – Chicago CubsAthletics Facilities District – Arizona State UniversitySnapDragon Stadium – San Diego State UniversityConsideration must be given to the unique nature of the Arroyo, as well as the revenue generating opportunityNature oriented – capture essence of ArroyoLow density development – minimal impact on neighbors Revenue opportunity – potentially significant revenue source OverviewVI. Ancillary Opportunities
Restaurant DevelopmentVI. Ancillary OpportunitiesThe Ranch – Laguna Beach, CATavern on the Green – New York, NY (Central Park) Klyde Warren Park – Dallas, TX
The Grove – Houston, TX
VI. Ancillary Opportunities
Ojai Valley Inn – Ojai, CA
The Lodge at Torrey Pines – La Jolla, CA
Old Course Hotel – St. Andrews (UK)
The Ahwahnee Hotel – Yosemite
The Ranch – Laguna Beach, CAHotel Development
Athletic Fields / ComplexesVI. Ancillary Opportunities
Great Park in Irvine – Irvine, CA
Round Rock Sports Center – Round Rock, TX
St. James Wellness and Entertainment Complex – Springfield, VA Ripken Experience – Aberdeen, MD
Bell Bank Park – Mesa, AZ
SummaryVII. Revenue Opportunities Summary
Preliminary Annual Net Annual NetEstimated Incremental Revenue Incremental RevenueConstruction After Expenses After ExpensesCostsBefore Debt ServiceAfter Debt ServiceFamily Golf Center $7.5M to $10.0M $1.6M $1.0MCampus Marque/Sponsorship Program $4.5M $0.9M to $1.5M $0.6M to $1.5MI-210 Freeway Sponsorship Program $3.0M $1.1M $1.0MSouth End Zone and In-Stadium Amphitheater $31.8M $3.1M $1.3MParking Tax TBD $3.0M $3.0MTransient Occupancy Tax TBD $3.0M $3.0MAncillary Opportunities TBD TBD TBDAlignment of Interests in Contracts with Tenants TBD TBD TBDThird Party Funding Opportunities TBD TBD TBD
The Rose Bowl Stadium is known as a community stadium and prides itself in giving back to the local community Community events and programmingEgg Bowl at the Rose BowlCinco de Mayo at the Rose Bowl AmericaFest 4th of July CelebrationTurkey TussleInvesting in the communityCentral Arroyo Community Recreation LoopPasadena Unified School District meal serviceCOVID-19 testingFEMA siteEnhancing educational opportunitiesField Trip to the Rose BowlBook Donation and School VisitsPUSD Robotics RallyRose Bowl InstituteWomen’s Empowerment ProgrammingRace and Sports Programming (in honor of Jackie Robinson)Other (Programming / Scholarships)Community business partnerships OverviewVIII. Community Programming
PCOC estimated economic impact results from two music festival events in May 2022 Just Like HeavenCruel World Rose Bowl Events – Economic ImpactIX. Economic Impact
IX. Economic Impact
IX. Economic Impact
IX. Economic Impact
RBOC faces a cumulative deficit of $19.5 million after debt service through FY 2027RBOC staff and its team of experts have identified approximately $45.6 million of unfunded capital repair, replacement, and improvement needs through FY 2028In order to address those needs, the RBOC is requesting the following:Authorize the General Manager, on behalf of the RBOC, to diligently pursue the following revenue generating opportunities in a pre-development phase: Family Golf CenterCampus Marquee/Sponsorship ProgramSponsorship I-210 / I-134 signageSouth End Zone seating projectAlignment of interests in contracts with UCLA and Tournament of RosesConsider potential city-wide parking tax Consider potential increase of Transient Occupancy Tax Third-party funding opportunities related to future capital improvementsExplore additional opportunities in the Rose Bowl area that would broaden the monetization opportunities while being cognizant of acceptable use within the Arroyo SecoAuthorize incoming City Manager and incoming RBOC CEO to work together and report to the RBOC and City Council (or subcommittee) quarterly with updates on progress RecommendationX. Recommended Next Steps
While not as common as in professional sports, there are a number of college football stadiums with corporate naming rights dealsSan Diego State University – Snapdragon 15-year, $45.0 million agreementColorado State University – Canvas Bank 12-year, $22.2 million agreementIn 2018, Los Angeles Memorial Coliseum reportedly agreed to a stadium naming rights agreement with United Airlines (16-year, $69 million), which would have changed the stadium’s name to “United Airlines Memorial Coliseum” – after public scrutiny, the deal was amended in 2019 to only include naming rights for the field (financial terms not disclosed)In addition to corporate naming rights deals, many other stadiums have naming rights based on major philanthropic gifts from donorsConsideration should be given to potential impacts of naming rights on the Rose Bowl brand and Legacy FoundationTenants have certain rights / restrictions regarding naming rightsRBOC engaged Elevate to estimate naming rights value at the Rose Bowl StadiumEstimated year 1 value of $4.2 millionEstimated total deal value of $48.2 million (10-year total)Estimated annual average value of $4.8 million OverviewAppendix A – Naming Rights
RBOC engaged Verde Design to evaluate the revenue potential of converting one of the two 18-hole golf courses at Brookside Golf Complex to a multi-purpose athletic facilityThe athletic facility could consist of three distinct areas14 field soccer facility, with 6 lighted synthetic turf fieldsLighted tennis facility with eight tennis courts and eight pickleball courtsDedicated all-weather track and field facility Verde estimated total annual revenue from the project at approximately $5.8 million (operating expenses not included –must be estimated)RBOC estimated revenue loss from golf at approximately $1.1 millionDoes not include lost parking revenue from other eventsVerde estimated total build-out costs for the project at approximately $39.3 millionConsideration should be given to operational impacts (ingress/egress, parking, etc.) OverviewAppendix B – Athletic Fields
Campus South EndzoneI-210 Marque and In-Stadium FamilySignage Program Amphitheater Golf - (1)Construction Costs (Estimated) $3,000,000 $4,500,000 $31,800,000 $7,770,000Incremental Net Revenue (Year 1) $1,142,250 $923,313 $3,149,864 $1,552,900Less: Debt Service Required($261,901) ($392,917) ($2,776,243) ($680,966)Add: Debt Service Surplus $87,300 $130,972 $925,414 $226,989Incremental Net Revenue - After Debt Service $967,650 $661,368 $1,299,035 $1,098,922Financial Returns15-Year Project IRR40.7% 21.9%8.1%21.3%15-Year Payback Period 2.9 4.9 9.0 5.0(1) - Assumptions provided by RBOC.Note: For illustrative purposes, calculations do not consider debt financing. Project IRR/NPV/etc. have been estimated.SummaryAppendix C – Revenue Enhancement Opportunities
Limiting Conditions and AssumptionsThe analysis has been prepared for internal decision making purposes of the Client only and shall not be used for any other purposes without the prior written permission of CAA ICON.The analysis includes findings and recommendations; however, all decisions in connection with the implementation of such findings and recommendations shall be Client’s responsibility.Ownership and management of the facility are assumed to be in competent and responsible hands. Ownership and management can materially impact the findings of this analysis.Any estimates of historical or future prices, revenues, rents, expenses, occupancy, net operating income, mortgage debt service, capital outlays, cash flows, inflation, capitalization rates, yield rates or interest rates are intended solely for analytical purposes and are not to be construed as predictions of the analysts. They represent only the judgment of the authors based on information provided by operators and owners active in the market place, and their accuracy is in no way guaranteed.Our work has been based in part on review and analysis of information provided by unrelated sources which are believed accurate, but cannot be assured to be accurate. No audit or other verification has been completed.Current and anticipated market conditions are influenced by a large number of external factors. We have not knowingly withheld any pertinent facts, but we do not guarantee that we have knowledge of all factors which might influence the operating potential of the facility. Due to rapid changes in the external factors, the actual results may vary significantly from estimates presented in this report.The analysts reserve the right to make such adjustments to the analyses, opinions, and conclusions set forth in this report as may be required by consideration of additional data or more reliable data which may become available.The analysis is intended to be read and used as a whole and not in parts. Separation of any section or page from the main body of the report is expressly forbidden and invalidates the analysis.Possession of the analysis does not carry with it the right of publication. It shall be used for its intended purpose only and by the parties to whom it is addressed. Other parties should not rely on the findings of this report for any purpose and should perform their own due diligence. Our performance of the tasks completed does not constitute an opinion of value or appraisal, or a projection of financial performance or audit of the facility in accordance with generally accepted audit standards. Estimates of value (ranges) have been prepared to illustrate current and possible future market conditions.The analysis shall not be used in any matters pertaining to any financing, or real estate or other securities offering, registration, or exemption with any state or with the federal Securities and Exchange Commission.No liability is assumed for matters which are legal or environmental in nature.
This analysis is subject to our contractual terms, as well as the following limiting conditions and assumptions: