AR 13 ATTACHMENT C

Pasadena City Council
April 24, 2023

Document
AR 13 ATTACHMENT C
Meeting
April 24, 2023
Body
Pasadena City Council
Original file
3.5 MB
Text extracted from the city's file for reading and search. Open the original on ww2.cityofpasadena.net. That file is the official record.

FY 2024 - 2028 Recommended Capital Improvement Program - New Projects Attachment C Project Name Total Estimated FY 2024
Project Cost Recommended
Appropriation
Municipal Buildings and Facilities (1)
1 Improvements at City Yards Facilities 5,000,000 500,000 Transportation (9)
2 Columbia Street Multimodal Improvements 9,900,000 9,900,000 3 Rose Bowl Pedestrian and Bicycle Access Study 250,000 4 Arroyo Link Walking and Biking Path 45,000,000
5 Traffic Signal Improvements at Orange Grove Blvd and Holly St, and at Orange Grove Blvd and 4,500,000 4,500,000 Colorado Blvd
6 Multimodal Improvements on San Rafael Ave at Linda Vista Ave and at Colorado Blvd 4,800,000 4,800,000 7 Mobility Hubs and First/Last Mile Improvements 24,000,000 0 8 Installation of Pedestrian Hybrid Beacons (HAWKs) at Various Locations 2,000,000 9 Hydrogen Fueling Station 16,000,000 250,000
10 Pasadena Light Rail Train (LRT) Tracking and Network Monitoring System - Phase I! 2,500,000 2,500,000 Sewers and Storm Drains (3)
11 East Side Storm Drain Project 9,000,000
12 Kinneloa Yard Stormwater Capture Project - Design Phase 2,292,762 13 Brookside Park Stormwater Capture Project - Design Phase 2,198,612 Parks and Landscaping (7)
14 Villa Parke Community Center - ADA Improvements - Locker Room and Parking Lot 750,000 750,000 15 Citywide Park Structure Installations Phase | 1,800,000 600,000 16 Citywide Park Structure Installations FY 2024-2028 7,500,000 0 17 Victory Park Installation of Foul Ball Netting, Bleachers, and Shae Structure - Design Phase 75,000 0 18 Villa Parke Small Soccer Field Improvements - Concept Study 75,000 0 19 Central Park - Lawn Bowling Clubhouse - Design Phase 200,000 200,000 20 Centenial Square Landscaping Project 900,000 0
Electric System (5)
21 GT-5 Upgrades and Replacements 1,630,800 1,130,800
22 Subtransmission Cable Upgrade (34-20) 3,200,000 1,941,000 23 Power Substation Weatherizing Enhancements 1,836,000 352,000 24 Oak Knoll Substation Upgrades 2,349,372 132,000
25 Villa Substation Upgrades 2,349,372 132,000
Total 150,106,918 27,687,800