Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
2021-2029 Housing Element (2021-2029). The City has transmitted the Housing Element to Pasadena Water and Power Department, Pasadena Public Works Department, and the Los Angel es County Sanitation District to allow for populati on projections to be incorporated into their plans accordingly. In addition, while the scale and specific sites of future developments are currently unknown, program operators of the proposed uses would be req uired to ensure infrastructure capacity and connect ions are reviewed and approved by the City. Therefore, the proposed emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites are not anticipated to result in an exceedance of the capacity of existing utility facilities, and no new or expanded facilities are a nticipated to be needed to service buildout of the zones identified by the proposed project. Similar to the General Plan Update, future developments implemented under the proposed project would also be required to adhere to all applicable solid waste regulations. Therefore, implementation of the proposed emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites would have no impact related to compliance with solid waste regulations.
The current CEQA Guidelines Appendix G checklist also includes assessment criteria for potential impacts related to the relocation or construction of new or expanded electric power, natural gas, or telecommunications facilities. Similar to water, wastewater, and solid waste facilities, existing service providers would manage electricity, natural gas, and telecommunicat ions services for future developments under the proposed project. As discuss ed, the zones permitted by the proposed project are primarily built out under existing conditions. Thus, it is anticipated that any new development of emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and safe parking uses in the allowed zones (by-right or with Minor Conditional Use Permits) would require lateral connections to mainlines in coordination with utility service providers, similar to what occurs under existing conditions. Therefore, the proposed emergency shelters, emergency shelters, li mited, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites would result in less than significant impacts related to the relocation or construction of new or expanded electric power, natural gas, and telecommunications facilities.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
In addition, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in impacts related to utilities and service systems.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
P age 3-74
Environmental Determination
B
ased upon the evidence in light of the whole record documented in the attached environmental checklist explanation, cited incorporations and attachments, the City finds that the Project:
H as previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. The proposed project is a component of the whole action analyzed in the previously adopted/certified CEQA document.
H as previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. Changes and additions to the earlier CEQA document are needed to make the previous documentation adequate to cover the project which are documented in this Addendum (CEQA Guidelines §15164). However, none of the conditions described in CEQA Guidelines Section 15162 that would require the preparation of a subsequent EIR have occurred.
H as previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. However, there is important new information and/or substantial changes have occurred requiring the preparation of an additional CEQA document (Negative Declaration or EIR) pursuant to CEQA Guidelines Sections 15162 through 15163.
Chapter 3: Evaluation of Environmental Impacts Eme rgency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Page Intentionally Left Blank
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
CHAPTER 4
MITIGATION MEASURES
A listing of applicable mitigation measures from the Pasadena General Plan Final Environmental Impact Report is presented below. The mitigation measures listed are the same as the measures in the Final EIR and would be applicable to the pro posed project. No new mitigation measures are required as a result of implementing the proposed project. The City, as the CEQA lead agency, is responsible for monitoring the implementation of the adopted mitigation measures.
Air Quality
2-1 Prior to issuance of any construction permits, dev elopment project applicants shall prepare and submit to the City of Pasadena Planning Division a technical assessment evaluating potential project construction-related a ir quality impacts. The evaluation shall be prepared in conformance with South Coast Air Quality Management District (SCAQMD) methodology for assessing air quality impacts. If construction-related criteria air pollutants are determined to have the potential to exceed the SCAQMD-adopted thresholds of significance, the City of Pasadena Planning Division shall require that applicants for new development projects incorporate mitigation measure s to reduce air pollutant emissions during construction activities. These identified me asures shall be incorporated into all appropriate construction documents (e.g., construction management plans) submitted to the City and shall be verified by the City’s Planning Division. Mitigation measures to reduce construction-related emissions include, but are not limited to:
• Requiring fugitive-dust control measures that exce ed SCAQMD’s Rule 403, such as:
• Use of nontoxic soil stabilizers to reduce wind er osion. • Applying water every four hours to active soil-dis turbing activities. • Tarping and/or maintaining a minimum of 24 inches of freeboard on trucks hauling dirt, sand, soil, or other loose materials.
• Using construction equipment rated by the United S tates Environmental Protection Agency as having Tier 3 (model year 2006 or newer) or Tier 4 (model year 2008 or newer) emission limits, applicable for engines between 50 and 750 horsepower. • Ensuring that construction equipment is properly s erviced and maintained to the manufacturer’s standards.
• Limiting nonessential idling of construction equip ment to no more than five consecutive minutes.
• Using Super-Compliant volatile organic compound (V OC) paints for coating of architectural surfaces whenever possible. A list of Super-Compliant architectural coating manufactures can be found on the SCAQMD’s w ebsite at http://www.aqmd.gov/prdas/brochures/Super-Compliant_AIM.pdf. 2-2 Prior to future discretionary project approval, de velopment project applicants shall prepare and submit to the City of Pasadena Planning Division a technical assessment evaluating potential project operation phase-related air quali ty impacts. The evaluation shall be prepared in conformance with SCAQMD methodology in assessing air quality impacts. If operation-related air pollutants are determined to have the potential to exceed the Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
SCAQMD-adopted thresholds of significance, the City of Pasadena Planning Division shall require that applicants for new development project s incorporate mitigation measures to reduce air pollutant emissions during operational activities. The identified measures shall be included as part of the Standard Conditions of Approval. Below are possible mitigation measures to reduce long-term emissions:
• Site-specific developments with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with California Air Resources Board Rule 2845 (13 California Code of Regulations Chapter 10 § 2485).
• Site-specific development shall demonstrate that a n adequate number of electrical vehicle Level 2 charging stations are provided onsi te. The location of the electrical outlets shall be specified on building plans, and proper installation shall be verified by the Building Division prior to issuance of a Certificate of Occupancy. • Applicant-provided appliances shall be Energy Star appliances (e.g., dishwashers, refrigerators, clothes washers, and dryers). Installation of Energy Star appliances shall be verified by the Building & Safety Division during plan check. • Applicants for future development projects along e xisting and planned transit routes shall coordinate with the City of Pasadena, Metro, and Foothill Transit to ensure that bus pads and shelters are incorporated, as appropriate.
2-4 Prior to future discretionary approval, the City o f Pasadena Planning Division shall evaluate new development proposals for sensitive la nd uses (e.g., residences, schools, and day care centers) within the City for potential incompatibilities with regard to the California Air Resources Board’s Air Quality and La nd Use Handbook: A Community Health Perspective (April 2005). In addition, appli cants for siting or expanding sensitive land uses that are within the recommended buffer di stances listed in Table 1-1 of the California Air Resources Board (CARB) Handbook shal l submit a HRA to the City of Pasadena. The HRA shall be prepared in accordance with policies and procedures of the state Office of Environmental Health Hazard Assessm ent (OEHHA) and the SCAQMD.
The latest OEHHA guidelines shall be used for the a nalysis, including age sensitivity factors, breathing rates, and body weights appropriate for children. If the HRA shows that the incremental cancer risk and/or noncancer hazard index exceeds the respective thresholds, as established by the SCAQMD at the tim e a project is considered, the applicant will be required to identify and demonstrate that mitigation measures are capable of reducing potential cancer and noncancer risks to an acceptable level (i.e., below the aforementioned thresholds as established by the SCA QMD), including appropriate enforcement mechanisms. Measures to reduce risk may include but are not limited to:
• Air intakes oriented away from high-volume roadway s and/or truck loading zones. • Heating, ventilation, and air conditioning systems of the buildings provided with appropriately sized maximum efficiency rating value (MERV) filters. • Heating, ventilation, and air conditioning systems for units that are installed with MERV filters shall maintain positive pressure within the building’s filtered ventilation system to reduce infiltration of unfiltered outdoor air.
Mitigation measures identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site development plan as a component of the proposed project. The air intake d esign and MERV filter requirements Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
shall be noted and/or reflected on all building pla ns submitted to the City and shall be verified by the City’s Planning Division. The inten t of this mitigation measure is to reflect current CARB and SCAQMD Guidance/Standards as well as CEQA legislation and case law, and the City implementation of the measure shall adhere to current standards/law at the time such analyses are undertaken.
Biological Resources
3-1 The City of Pasadena shall require applicants of f uture development projects that disturb undeveloped land in the San Rafael Hills and tract of land at the northwest intersection of Crestford Drive and Florecita Drive, to prepare a biological resources survey. The survey shall be conducted by a qualified biologist and shall be a reconnaissance level field survey of the project site for the presence and quality of biological resources potentially affected by project development. These resources include, bu t are not limited to, special status species or their habitat, sensitive habitats such a s wetlands or riparian areas, and jurisdictional waters. If sensitive or protected bi ological resources are absent from the project site and adjacent lands potentially affected by the project, the biologist shall submit a written report substantiating such to the City of Pasadena before issuance of a grading permit by the City, and the project may proceed without any further biological investigation.
If sensitive or protected biological resources are present on the project site or may be potentially affected by the project, implementation of Mitigation Measure 3-2 shall be required.
3-2 A qualified biologist shall evaluate impacts to se nsitive or protected biological resources from development. The impact assessment may require focused surveys that determine absence or presence and distribution of biological resources on the site. These surveys may include, but are not limited to: 1) focused spe cial status animal surveys if suitable habitat is present; 2) appropriately timed focused special status plant surveys that will maximize detection and accurate identification of target plant species; and 3) a delineation of jurisdictional boundaries around potential wetlands, riparian habitat, and waters of the United States or State. The results of these surveys will assist in assessing actual project impacts, and with the development of project-specif ic mitigation measures. Alternatively, the project applicant may forgo focused plant and a nimal surveys and assume presence of special status species in all suitable habitats on the project site. The qualified biologist shall substantiate the impact evaluation or the ass umed presence of special-status species in all suitable habitats onsite in a written report submitted to the City of Pasadena before issuance of a grading permit by the City.
3-3 The City of Pasadena shall require applicants of d evelopment project to avoid potential impacts to sensitive or protected biological resour ces to the greatest extent feasible.
Depending on the resources potentially present on t he project site, avoidance may include: 1) establishing appropriate no-disturbance buffers around onsite or adjacent resources, and/or 2) initiating construction at a t ime when special status or protected animal species will not be vulnerable to project-re lated mortality (e.g., outside the avian nesting season or bat maternal or wintering roostin g season). Consultation with relevant regulatory agencies may be required in order to est ablish suitable buffer areas. If the project avoids all sensitive or protected biological resources, no further action is required.
If avoidance of all significant impacts to sensitiv e or protected biological resources is not feasible, the project shall implement Mitigation Measure 3-4.
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
3-4 The City of Pasadena shall require applicants to d esign development projects to minimize potential impacts to sensitive or protected biologi cal resources to the greatest extent feasible, in consultation with a qualified biologis t and/or appropriate regulatory agency staff. Minimization measures may include 1) exclusion and/or silt fencing, 2) relocation of impacted resources, 3) construction monitoring by a qualified biologist, and 4) an informative training program conducted by a qualified biologist for construction personnel on sensitive biological resources that may be impac ted by project construction. If minimization of all significant impacts to sensitiv e or protected biological resources is infeasible, the project shall implement Mitigation Measure 3-5.
3-5 A qualified biologist will develop appropriate mit igations that will reduce project impacts to sensitive or protected biological resources to a le ss than significant level, if feasible. The type and amount of mitigation will depend on the re sources impacted, the extent of the impacts, and the quality of habitats to be impacted . Mitigations may include, but are not limited to: 1) compensation for lost habitat or waters in the form of preservation or creation of in-kind habitat or waters, either onsite or offs ite, protected by conservation easement; 2) purchase of appropriate credits from an approved mitigation bank servicing the Pasadena area; and 3) payment of in-lieu fees.
3-6 Applicants of projects developed pursuant to the G eneral Plan Update shall obtain appropriate permit authorization(s) for impacts to jurisdictional waters, wetlands, and/or riparian habitats. The types of permits potentially required for impacts to jurisdictional waters are a Clean Water Act (Section 404) permit i ssued by the US Army Corps of Engineers, a California Water Certificate or Waste Discharge Order issued by the Regional Water Quality Control Board, and a Stream Alteration Agreement issued by the California Department of Fish and Wildlife.
Cultural Resources
4-1 If cultural resources are discovered during constr uction of land development projects in Pasadena that may be eligible for listing in the California Register for Historic Resources, all ground disturbing activities in the immediate vicinity of the find shall be halted until the find is evaluated by a Registered Professional Arch aeologist. If testing determines that significance criteria are met, then the project sha ll be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; and provide a comprehensive final report including site record to the City and the South Central Coastal Information Center at California State University Fullerton. No further grading shall occur in the area of the discovery until Planning Department approves the report.
4-2 The City shall require applicants for development permits that involve grading in areas within the paleontologically sensitive Topanga formation to provide studies by a qualified paleontologist assessing the sensitivity of the project for buried paleontological resources.
On properties determined to be moderately to highly sensitive for paleontological resources, such studies shall provide a detailed mi tigation plan, including a monitoring program and recovery and/or in situ preservation plan, based on the recommendations of a qualified paleontologist. The mitigation plan shall include the following requirements:
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
• A paleontologist shall be retained for the project and will be on call during grading and other significant ground-disturbing activities more than six feet below the ground surface.
• Should any potentially significant fossil resource s be discovered, no further grading shall occur in the area of the discovery until the Planning and Community Development Director concurs in writing that adequate provision s are in place to protect any significant resources. Work may continue outside a minimum radius of 25 feet from the discovery pending review by the Director.
• Unanticipated discoveries shall be evaluated for s ignificance by a qualified paleontologist. If evaluation determines that signi ficance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; and provide a comprehensive final report, including catalog with museum numbers.
Greenhouse Gas Emissions
5-1 Within approximately 18 months of adoption of the p roposed General Plan Update, the City of Pasadena shall prepare and present to the City Council for adoption a community climate action plan/greenhouse gas reduction plan. The Plan shall identify strategies to be implemented to reduce GHG emissions associated with the City and shall include as one alternative a program that achieves the AB 32 targe ts. In addition, the City shall monitor GHG emissions by updating its community-wide GHG em issions inventory every five years upon adoption of the initial Plan. Upon the n ext update to the community climate action plan/greenhouse gas reduction plan, the inventory, GHG reduction measures, and GHG reductions shall be forecast to year 2035 to en sure progress toward achieving the interim target that aligns with the long-term GHG r eduction goals of Executive Order S- 03-04. The Plan update shall take into account the reductions achievable from federal and state actions and measures as well as ongoing work by the City and the private sector.
The 2035 Plan update shall be completed by January 1, 2021, with a plan to achieve GHG reductions for 2035 or 2040, provided the state has an actual plan to achieve reductions for 2035 or 2040. New reduction programs in similar sectors as the proposed Plan (building energy, transportation, waste, water, was tewater, agriculture, and others) will likely be necessary. Future targets shall be consid ered in alignment with state reduction targets, to the maximum extent feasible, but it is premature at this time to determine whether or not such targets can be feasibly met through the combination of federal, state, and local action given technical, logistical and financial constraints. Future updates to the community climate action plan/greenhouse gas reduct ion plan shall account for the horizon beyond 2035 as the state adopts actual plan s to meet post-2035 targets. In all instances, the community climate action plan/greenh ouse gas reduction plan and any updates shall be consistent with state and federal law.
Noise
9-1 Prior to issuance of building and occupancy permits, applicants of industrial projects that involve vibration-intensive machinery or activities adjacent to sensitive receptors shall prepare a study to evaluate potential vibration impacts. The study shall be prepared by an acoustical engineer and be submitted to the City of Pasadena Planning Division. The study shall evaluate the vibration levels associated with operation of project-related equipment and activities experienced by nearby sensitive receptors. If it is determined that vibration impacts to nearby receptors exceed the Federal Tran sit Administration (FTA) vibration- Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
annoyance criterion, the study shall recommend and the applicant shall implement the identified measures with the purpose of reducing vi bration impacts to a less than significant level. The City of Pasadena shall verif y implementation of all identified measures.
9-2 Prior to issuance of building permits for the new construction of habitable area, applicants for development projects shall adhere to the approp riate Vibration Category 2 and Vibration Category 3 screening distances for light rail transit as recommended in Table 9- 2 of FTA’s Transit Noise and Vibration Impact Asses sment (FTA 2006) in evaluating vibration impacts related to trains on the Metro Go ld Line. Applicants for development projects that fall within the screening distances s hall prepare and submit to the City of Pasadena Planning Division a study evaluating vibra tion impacts to the proposed development from train operations. The study shall be prepared by an acoustical engineer who shall identify measures to reduce impacts to ha bitable structures to below the FTA vibration annoyance criterion. The identified measures shall be incorporated into all design plans submitted to the City of Pasadena.
9-3 Prior to issuance of any grading and construction permits, applicants for individual projects that involve vibration-intensive construction activities, such as pile drivers, jack hammers, and vibratory rollers, within 25 feet of sensitive receptors (e.g., residences and historic structures) shall prepare and submit to the City of Pasadena Planning Division a study to evaluate potential construction-related vibration impacts. The study shall be prepared by an acoustical engineer and shall identify measures to reduce impacts to habitable structures to below the FTA vibration annoyance criterion. If construction-related vibration is determined to be perceptible at vibration-sensitive uses, additional requirements, such as use of less-vibration-intensive equipment or con struction technique, shall be implemented during construction (e.g., drilled pile s, static rollers, and nonexplosive rock blasting). Identified measures shall be included on all construction and building documents and submitted for verification to the City of Pasadena Planning Division.
9-4 Prior to issuance of any construction permits, applicants for individual projects that involve vibration-intensive construction activities, such as pile drivers, jack hammers, bulldozers, and vibratory rollers, within 25 feet of sensitive receptors (e.g., residences) or 50 feet of historic structures, shall prepare and submit to th e City of Pasadena Planning Division a study to evaluate potential construction-related vi bration impacts. The vibration assessment shall be prepared by an acoustical engin eer and be based on the FTA vibration-induced architectural damage criterion. I f the study determines a potential exceedance of the FTA thresholds, measures shall be identified that ensure vibration levels are reduced to below the thresholds. Measure s to reduce vibration levels can include use of less-vibration-intensive equipment ( e.g., drilled piles and static rollers) and/or construction techniques (e.g., nonexplosive rock blasting and use of hand tools) and preparation of a preconstruction survey report to assess the condition of the affected sensitive structure. Notwithstanding the above, pile drivers shall not be allowed within 150 feet of any historic structures. Identified measure s shall be included on all construction and building documents and submitted for verificati on to the City of Pasadena Planning Division.
9-5 Prior to issuance of construction permits, applicants for new development projects within 500 feet of noise-sensitive receptors shall impleme nt the following best management practices to reduce construction noise levels:
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
• Consider the installation of temporary sound barri ers for construction activities immediately adjacent to occupied noise-sensitive structures. • Equip construction equipment with mufflers.
• Restrict haul routes and construction-related traf fic. • Reduce nonessential idling of construction equipme nt to no more than five minutes.
The identified best management practices shall be n oted on all site plans and/or construction management plans and submitted for ver ification to the City of Pasadena Planning Division.
Transportation and Traffic
13-1 The City of Pasadena shall update its existing transportation impact fee program by 2020.
The City shall prepare a “Nexus” Study that will se rve as the basis for requiring development impact fees under AB 1600 legislation, as codified by California Code Government Section 66000 et seq. The established pr ocedures under AB 1600 require that a “reasonable relationship” or nexus exist bet ween the traffic improvements and facilities required to mitigate the traffic impacts of new development pursuant to the proposed project. After approval of the Nexus Study , the City shall update the transportation impact fee program to fund all citywide circulation improvements, including the pedestrian and bicycle network. The fee program shall stipulate that fees are assessed when there is new construction or when there is an increase in square footage within an existing building or the conversion of existing squ are footage to a more intensive use.
Fees are calculated by multiplying the proposed squ are footage or dwelling unit by the rate identified. The fees are included with any oth er applicable fees payable at the time the building permit is issued. The City will use the development fees to fund construction (or to recoup fees advanced to fund construction)
.
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Page Intentionally Left Blank
Chapter 5: List of Preparers Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
CHAPTER 5
LIST OF PREPARERS
LEAD AGENCY
The City of Pasadena
Planning & Community Development Department
175 N. Garfield Avenue
Pasadena, CA 91101
David Sanchez, Principal Planner
Martin Potter, Senior Planner
PREPARED BY
Michael Baker International
3760 Kilroy Airport Way, Suite 270
Long Beach, California 90806
John Bellas, Project Director
Kathalyn Tung, Project Manager
Frankie Tong, Senior Environmental Planner
Vicky Rosen, Environmental Analyst
Chapter 5: List of Preparers Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Page Intentionally Left Blank