ATTACHMENT J
ADDENDUM TO GENERAL PLAN EIR
Emergency Shelter and Other Code Amendments
Addendum
to the
Pasadena General Plan
Environmental Impact Report
Prepared for:
The City of Pasadena
Planning & Community Development Department
175 N. Garfield Avenue
Pasadena, CA 91101
Prepared by:
3760 Kilroy Airport Way, Suite 270
Long Beach, California 90806
April 2023
Page Intentionally Left Blank
Table of Contents Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Page i
Table of Contents
CHAPTER 1 PURPOSE AND BACKGROUND .................................................................. 1-1
1.1 Applicability and Use of an Addendum .......... ............................ 1-1
1.2 Format of This Addendum ....................... .................................. 1-3
1.3 Summary of Findings ........................... ...................................... 1-3
1.4 Lead Agency and Discretionary Approvals ....... ......................... 1-3 CHAPTER 2 PROJECT DESCRIPTION ........................................................................ .... 2-1
2.1 Introduction .................................. .............................................. 2-1
2.2 Project Location .............................. ........................................... 2-2
2.3 Project Intent ................................ ........................................... 2-11
2.4 Description of the Proposed Project ........... .............................. 2-12 CHAPTER 3 EVALUATION OF ENVIRONMENTAL IMPACTS ......................................... 3-1 I. AESTHETICS. .................................... ....................................... 3-2 II. AGRICULTURAL RESOURCES. ....................... ........................ 3-6 III. AIR QUALITY. ................................. .......................................... 3-9 IV. BIOLOGICAL RESOURCES .......................... ......................... 3-13 V. CULTURAL RESOURCES ............................. ......................... 3-18 VI. ENERGY ........................................ ......................................... 3-22 VII. GEOLOGY AND SOILS ............................ ............................... 3-24 VIII. GREENHOUSE GAS EMISSIONS .................... ...................... 3-29 IX. HAZARDS AND HAZARDOUS MATERIALS ............... ............ 3-32 X. HYDROLOGY AND WATER QUALITY .................... ............... 3-38 XI. LAND USE AND PLANNING ......................... .......................... 3-44 XII. MINERAL RESOURCES ............................ ............................. 3-48 XIII. NOISE ....................................... .............................................. 3-50 XIV. POPULATION AND HOUSING ....................... ........................ 3-54 XV. PUBLIC SERVICES................................ ................................. 3-57 XVI. RECREATION ................................... ...................................... 3-60 XVII. TRANSPORTATION/TRAFFIC ...................... .......................... 3-63 XVIII. UTILITIES AND SERVICE SYSTEMS .............. ....................... 3-69 Environmental Determination .............................................................. 3-74 CHAPTER 4 MITIGATION MEASURES ........................................................................ .... 4-1 CHAPTER 5 LIST OF PREPARERS .......................................................................... ........ 5-1
Table of Contents Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Page ii
List of Figures
Figure 1 – Regional Location Map...................................................................... ....................... 2-3 Figure 2 – Existing Zones for Emergency Shelters Permitted with Minor Conditional Use Permit………………………………………………………… …..2-4 Figure 3 – Existing Zones for Emergency Shelters, Limited Permitted By-Right ........................ 2-5 Figure 4 – Proposed Zones for Emergency Shelters Permitted with Minor Conditional Use Permit ..................... ................................................... .......... 2-6 Figure 5 – Proposed Zones for Emergency Shelters, Limited, Permitted By-Right .................... 2-7 Figure 6 – Proposed Low Barrier Navigation Centers Permitted By-Right ................................. 2-8 Figure 7 – Proposed Safe Parking Permitted with Minor Conditional Use Permit ...................... 2-9 Figure 8 – Housing Element Sites Inventory Map for Design Review Threshold Amendment…2-10
Table of Contents Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Page iii
Acronyms and Abbreviations
AB Assembly Bill
BMP Best Management Practice
CARB California Air Resources Board
CDSP Central District Specific Plan
CEQA California Environmental Quality Act
CG Commercial General
Checklist Environmental Checklist Form
City City of Pasadena
CL Limited Commercial
CMP Congestion Management Program
CO
ECSP
Commercial Office
East Colorado Specific Plan
EIR Environmental Impact Report
EPSP East Pasadena Specific Plan
FOOG Fair Oaks/Orange Grove Specific Plan
FTA Federal Transit Administration
GHG greenhouse gas
GP EIR 2015 Pasadena General Plan Environmental Impact Report HRA health risk assessment
IG General Industrial
IS Initial Study
LASP Lincoln Avenue Specific Plan
LTS Less than Significant Impact
LTS-M Less than Significant Impact with Mitigation
MERV Maximum efficiency rating value
MMRP Mitigation Monitoring and Reporting Program
NI No Impact
NLSP North Lake Specific Plan
O3 ozone
OSHA Occupational Safety and Health Administration
PFD Pasadena Fire Department
PM 2.5 fine particulate matter 2.5 microns or less in diameter PM 10 respirable particulate matter ten microns or less in diameter PMC Pasadena Municipal Code
PPD Pasadena Police Department
PPL Pasadena Public Library
PS Public, Semi -Public
PWP Pasadena Department of Water and Power
RM Multi-Family Residential
RS Single -Family Residential
RTP/SCS Regional Transportation Plan/Sustainable Co mmunities Strategy S-U Significant and Unavoidable Impact
SB Senate Bill
SCAB South Coast Air Basin
SCAG Southern California Association of Governments
SCAQMD South Coast Air Quality Management District
SFOSP South Fair Oaks Specific Plan
VMT vehicle miles traveled
VT vehicle trips
Chapter 1: Purpose and Background Emergency Shelte r and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
CHAPTER 1
PURPOSE AND BACKGROUND
The City of Pasadena (City) has prepared this Adden dum to the 2015 Pasadena General Plan Environmental Impact Report (GP EIR) (State Clearin ghouse No. 2013091009) to address the potential environmental impacts associated with the Emergency Shelter and Other Code Amendments (proposed amendments or proposed project ). This Addendum is prepared in accordance with the California Environmental Quality Act of 1970 (CEQA) (Cal. Public Resources Code Section 21000, et. seq ., as amended) and its implementing guidelines (Cal . Code Regs., Title 14, Section 15000 et. seq ., 2016). This Addendum has been prepared and will be processed consistent with CEQA Guidelines (Cal. Code Regs., Title 14, Section 15162 and Section 15164).
In 2015, the City updated the Pasadena General Plan and prepared the GP EIR to analyze potential citywide impacts, broad policy alternativ es, and programmatic mitigation measures associated with the update of the Pasadena General Plan and specific plan amendments. The changes focused on the Land Use and Mobility Elements and the Land Use Diagram. The update also included the consolidation of optional elements into required elements of the General Plan.
The Land Use and Mobility Elements, together with t he other General Plan elements, guide the overall physical development of the City through ho rizon year 2035. The GP EIR is a Program EIR as defined by CEQA Guidelines Section 15161, Ca lifornia Code of Regulations, Title 14, Division 6, Chapter 3 and prepared in compliance wi th CEQA Guidelines Section 15168. The Final GP EIR was certified and the findings, Statem ent of Overriding Considerations, and Mitigation Monitoring and Reporting Program (MMRP) adopted by the City Council on August 17, 2015 (Resolution No. 9451).
Following the adoption of the Pasadena General Plan and certification of the GP EIR, future discretionary actions include amendments and zone c hanges to provide consistency with the General Plan. In this regard, the City is proposing amendments to the Pasadena Municipal Code (PMC) to update standards and requirements for emergency shelters, emergency shelters, limited and define standards and requirements for Low Barrier Navigation Centers and Safe Parking. The City is also proposing amendments to the PMC to replace the procedures of Section 17.61.080.I, Modifications for individuals with disabilities, wi th new policies and procedures for reasonable accommodation, and add a provision for sites identi fied in previous Housing Elements and included in the current Housing Elements Sites Inventory as required by State law.
Per the GP EIR, future discretionary review may rel y on analysis provided in the GP EIR for the purpose of tiering and/or streamlining. The purpose of tiering is to use the analysis of general matters contained in a broader EIR (such as the GP EIR) with later CEQA documents on narrower or more site specific projects (CEQA Guidelines Sec tion 15152). Tiering serves to reduce repetitive analysis and provide subsequent site specific analysis at a time when it is meaningful.
Tiering is common and appropriate when the sequence of analysis is from a General Plan EIR to a program of lesser scope, such as zoning changes ( CEQA Guidelines Section 15152[b]).
Therefore, CEQA review required for the proposed project may tier from the GP EIR pursuant to CEQA Guidelines Section 15152.
1.1 Applicability and Use of an Addendum
Per the GP EIR, CEQA review required for the propos ed project may tier from the GP EIR pursuant to CEQA Guidelines Section 15152. In addition, per CEQA Guidelines Section 15152(h), Chapter 1: Purpose and Background Emergency Shelte r and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
other methods to streamline the environmental review process also exist. These methods include the use of a Program EIR (i.e., GP EIR) for later activities (CEQA Guidelines Section 15168) and preparing an addendum (CEQA Guidelines Section 1516 4). Lead agencies have discretion regarding which method may apply and should be used.
Under the process described in CEQA Guidelines Section 15168(c), later activities in the program must be examined in the light of the Program EIR to determine whether an additional environmental document must be prepared. No additio nal documentation is required for subsequent proposed actions (e.g., a proposed ordin ance relating to land use matters) if the examination determines that the potential impacts w ere within the scope of the GP EIR, and subsequent proposed actions implement appropriate f easible mitigation measures identified in the MMRP that accompanies the Final EIR. Whether a later activity is within the scope of a Program EIR is a factual question that the lead agency determines based on substantial evidence in the record. Factors that a legal agency may consider in making that determination include, but are not limited to, consistency of the later activi ty with the type of allowable land use, overall planned density and building intensity, geographic area analyzed for environmental impacts and covered infrastructure as described in the Program EIR. If the agency finds that pursuant to CEQA Guidelines Section 15162, no subsequent EIR would b e required, the agency can approve the activity as being within the scope of the project c overed by the program EIR, and no new environmental document would be required.
The conditions in CEQA Guidelines Section 15162 cal ling for the preparation of a subsequent EIR are:
1. Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the inv olvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
2. Substantial changes occur with respect to the ci rcumstances under which the project is undertaken which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environme ntal effects or a substantial increase in the severity of previously identified significant effects; or
3. New information of substantial importance which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
a. The project will have one or more significant ef fects not discussed in the previous EIR or negative declaration;
b. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
c. Mitigation measures or alternatives previously f ound not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adop t the mitigation measures or alternative; or
d. Mitigation measures or alternatives which are co nsiderably different from those analyzed in the previous EIR would substantially reduce one or more significant effects Chapter 1: Purpose and Background Emergency Shelte r and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
Pursuant to CEQA Guidelines Section 15164, the City , as the lead agency, has prepared this Addendum to confirm that none of the conditions ide ntified in CEQA Guidelines Section 15162 and Public Resources Code Section 21166(c) have bee n triggered. For a proposed modified project or related activity, CEQA Guidelines Sectio n 15164 provides that an Addendum to a previously certified Final EIR may be prepared if o nly minor technical changes or additions are necessary, or none of the conditions described in S ection 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred. The City must consider the whole of the data presented in the GP EIR with the information provided in this Addendum and the previously adopted MMRP.
1.2 Format of This Addendum
The previously certified GP EIR serves as the prima ry environmental compliance document for the project, and this Addendum provides minor chang es and additions to the GP EIR. This Addendum should be considered with the full text of the previously certified 2015 GP EIR. All applicable mitigation measures from the GP EIR would be applicable to the proposed project and, therefore, are incorporated by reference into this Addendum and included in Chapter 4. This Addendum relies on the use of an Environmental Chec klist Form (Checklist), as suggested in Section 15063(d)(3) of the CEQA Guidelines. Per the CEQA Guidelines, an addendum does not need to be circulated for public review but can be included in or attached to the Final EIR prior to making a decision on the project.
1.3 Summary of Findings
Based upon the Checklist prepared for the proposed amendments and supporting responses (see Chapter 3), adoption of the proposed amendments wou ld not result in substantial changes requiring major revisions to the previously certifi ed GP EIR. Further, the proposed amendments would not result in any new significant environmental impacts that were not discussed in the GP EIR or a substantial increase in the severity of pr eviously identified significant impacts. No new mitigation measures are required for the proposed a mendments. Since only minor changes and additions are required to the GP EIR, and none of t he conditions described in Public Resources Code Section 21166 or CEQA Guidelines Section 15162 (a-b) or Section 15163 requiring preparation of a subsequent or supplemental EIR hav e occurred, the City finds that the preparation of an addendum to the GP EIR is the app ropriate CEQA documentation for the proposed project and that the proposed project is within the scope of the GP EIR.
1.4 Lead Agency and Discretionary Approvals
This Addendum and the previously certified GP EIR a re intended to serve as the environmental documentation for the changes being proposed under the Emergency Shelter and Other Code Amendments. The City of Pasadena is the lead agency under CEQA and maintains authority to approve the Addendum for the adoption of the Emergency Shelter and Other Code Amendments.
Discretionary approvals being sought as part of the Emergency Shelter and Other Code Amendments include the following:
Chapter 1: Purpose and Background Emergency Shelte r and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
• Acknowledgement of this Addendum to the GP EIR and that no subsequent CEQA document is required;
• Zoning Code amendment(s) as necessary to implement the amendments related to emergency shelter, emergency shelter, limited, Low Barrier Navigation Centers, Safe Parking, reasonable accommodation policy and procedures, and design review to add the uses and standards proposed in the amendments t o the permitted uses and standards in the Zoning Code, to regulate zoning co nsistent with the General Plan, and any other minor technical updates needed for im plementation of the proposed ordinance.
Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
CHAPTER 2
PROJECT DESCRIPTION
2.1 Introduction
On August 18, 2015, the City certified the Pasadena General Plan Final Environmental Impact Report. The GP EIR analyzed potential citywide impa cts, broad policy alternatives, and programmatic mitigation measures. The GP EIR analyz ed the update of the Pasadena General Plan and specific plan amendments. The changes focu sed on the Land Use and Mobility Elements and the Land Use Diagram. The update also included the consolidation of optional elements into required elements of the General Plan . The Land Use and Mobility Elements, together with the other General Plan elements, guide the overall physical development of the City through horizon year 2035.
The City is proposing amendments to the PMC to amen d standards and requirements for the emergency shelters and emergency shelters, limited land use categories; add new land use categories for Low Barrier Navigation Centers and Safe Parking locations; update the policy and procedures for reasonable accommodation for persons with disabilities seeking fair access to housing; and exempt previously identified sites in Housing Elements from discretionary design review.
Proposed new land use categories include Low Barrie r Navigation Centers and Safe Parking locations. Low Barrier Navigation Centers would pro vide housing and services to individuals seeking permanent housing, along with their partners and/or pets, for up to 12 continuous months.
As Low Barrier Navigation Centers are currently permitted by-right in areas zoned for mixed use and nonresidential zones permitting multifamily use s per Government Code Section 65660, the City’s amendments will formalize the land use in the Zoning Code. Safe Parking locations would allow for the provision of designated off-street parking areas for unhoused individuals and families with vehicles creating a safe place to park overnight.
The purpose of the proposed project is to provide more inclusive standards and requirements to serve the City of Pasadena’s housing needs, thereby implementing elements of the City’s 6 th
Cycle Housing Element and bringing the City’s Zoning Ordinance into compliance with State law.
The proposed amendments would help achieve the goals and vision of the General Plan through amending the requirements for emergency shelters an d emergency shelters, limited, and providing new land use categories for Low Barrier Navigation Centers by-right and Safe Parking locations through a Minor Conditional Use Permit; improving zoning-related procedures for people with disabilities seeking housing; and exempting pr eviously identified sites in Housing Elements from discretionary design review.
The purpose of this Addendum to the GP EIR is to evaluate the environmental effects associated with the proposed Emergency Shelter and Other Code Amendments and to determine whether these impacts are consistent with the evaluation pr esented in the GP EIR in compliance with CEQA (Public Resources Code Sections 21000 et seq.) and the State CEQA Guidelines (Cal.
Code of Regs. Section 15000 et seq.).
Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
2.2 Project Location
The Emergency Shelter, Emergency Shelter, Limited, and Low Barrier Navigation Center amendments would apply to specific zones throughout the City of Pasadena. These zones are identified in Section 2.4.2 of this Addendum. Figur e 1 shows the regional location of the City.
Figures 2 and 3 show the existing zones where Emergency Shelters with a Minor Conditional Use Permit are allowed and Emergency Shelters, Limited are allowed by-right. Figures 4 and 5 show the proposed zones where Emergency Shelters would b e allowed with a Minor Conditional Use Permit and Emergency Shelters, Limited would be allowed by-right. Figure 6 shows the proposed zones where Low Barrer Navigation Centers would be allowed by-right. Figure 7 shows the zones where Safe Parking is proposed to be allowed with a Minor Conditional Use Permit. Figure 8 shows the specific Housing Element sites where the Design Review Threshold amendment would apply.
The Reasonable Accommodation Policy and Procedures amendment is not associated with a specific project location as it is a procedural change to the PMC. However, the amendment may be applied citywide.
Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Figure 1 – Regional Location Map
Chapter 2: Project Description Emergency Shelter and Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Figure 2 – Existing Zones for Emergency Shelters Permitted with Minor Conditional Use Permit
Chapter 2: Project Description Emergency Shelter and Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Figure 3 – Existing Zones for Emergency Shelters, Limited Permitted By-Right
Chapter 2: Project Description Emergency Shelter and Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Figure 4 – Proposed Zones for Emergency Shelters Permitted with Minor Conditional Use Permit
Chapter 2: Project Description Emergency Shelter and Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Figure 5 – Proposed Zones for Emergency Shelters, Limited Permitted By-Right
Chapter 2: Project Description Emergency Shelter and Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Figure 6 – Proposed Low Barrier Navigation Centers Permitted By-Right 1
1 The proposed zones and the existing zones are the same (i.e., no change in zones).
Chapter 2: Project Description Emergency Shelter and Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Figure 7 – Proposed Safe Parking Permitted with Minor Conditional Use Permit Chapter 2: Project Description Emergency Shelter and Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Figure 8 – Housing Element Sites Inventory Map for Design Review Threshold Amendment
Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
2.3 Project Intent
The primary goals and objectives identified in the 2015 GP EIR include:
• Objective 1: Provide a new Land Use Element that t argets growth to serve community needs and enhance the quality of life. Direct highe r density development away from residential neighborhoods and into the Central Dist rict, Transit Villages, and Neighborhood Villages.
• Objective 2: Reduce vehicle miles traveled for the City and the region by providing a diverse housing stock, job opportunities, and excit ing districts with commercial and recreational uses, and transit opportunities in the Central District, Transit Villages, and Neighborhood Villages.
• Objective 3: Ensure new development builds upon Pa sadena’s tradition of strong sense of place, great neighborhoods, gardens, plazas, parks, and trees. • Objective 4: Preserve Pasadena’s historic resource s by ensuring that new development is compatible with and differentiated from existing historic resources. • Objective 5: Achieve economic vitality and fiscal responsibility by providing jobs, services, revenues, and opportunities with a diverse economic base. • Objective 6: Provide a General Plan that establish es the goals and policies to create a socially, economically, and environmentally susta inable community. Provide safe, well-designed, accessible, and human-scale residential and commercial areas where people of all ages can live, work, and play, including neighborhood parks, urban open spaces, and the equitable distribution of public and private recreational facilities. • Objective 7: Create a cultural, scientific, corpor ate, entertainment, and educational center for the region. Provide long-term growth opp ortunities for existing institutions and foster a healthy economy to attract new cultura l, scientific, corporate, entertainment, and educational institutions.
• Objective 8: Create mobility guidelines and multim odal metrics consistent with Senate Bill (SB) 743. Incorporate new goals, policies, and programs that balance multiple modes of transportation and meet the requirements of the Complete Streets Act. • Objective 9: Reduce greenhouse gas emissions and e ncourage walking, biking, transit, and other alternatives to motor vehicles b y creating strategies to encourage nonautomotive travel and protect residential neighborhoods consistent with Assembly Bill (AB) 32, SB 375, and SB 743.
• Objective 10: Reconcile General Plan buildout proj ections with regional and subregional estimates for growth creating consisten cy with the Southern California Association of Governments (SCAG).
• Objective 11: Incorporate housing sites identified in the adopted Housing Element with the Land Use Element.
The overall purpose of the proposed project is to s erve the needs of the unhoused community through amending the requirements for emergency shelters and emergency shelters, limited, and providing new land use categories for Low Barrier Navigation Centers by-right and Safe Parking locations with a Minor Conditional Use Permit; to i mprove zoning-related procedures for people with disabilities seeking housing; and to exempt sites identified in previous Housing Elements that were carried forward to the current Housing Element ’s Sites Inventory from discretionary design Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
review. These amendments to the PMC would help achi eve the goals and vision of the General Plan by providing more inclusive standards and requ irements to serve the community’s housing needs such that the City of Pasadena can be an equi table, safe, accessible place for all its residents. The proposed amendments would also imple ment certain policies of the City’s 6th Cycle Housing Element and to bring the City’s Zoning Ordinance into compliance with State law.
2.4 Description of the Proposed Project
The City is proposing amendments to the PMC to amen d standards and requirements for emergency shelters and emergency shelters, limited, land uses, and to allow for a new land use, Low Barrier Navigation Center, which would provide housing and services to individuals seeking permanent housing, along with their partners and/or pets, for up to 12 continuous months.
Additionally, the City is proposing an amendment to the PMC to allow for designated safe off- street parking areas for unhoused individuals and f amilies with vehicles. The proposed amendments would also replace the public hearing process with an administrative review process for persons with disabilities seeking fair access t o housing and zoning-related reasonable accommodations. Lastly, the City is introducing a provision to exempt specific housing sites from discretionary design review. The proposed code amendments are detailed in Section 2.4.2 below.
2.4.1 Relationship to 2015 General Plan
The 2015 Pasadena General Plan represented an update to the General Plan Elements, including the Mobility Element and the Land Use Element, which guide the overall physical development of the City. As this document compares the environmental impacts of the proposed amendments to those analyzed in the GP EIR, it is important to note that the proposed amendments do not modify or change the intent of the adopted General Plan. Rather, the Emergency Shelter and Other Code Amendments are being proposed to achieve the goals and vision of the General Plan by providing more inclusive standards and requirements to serve the City of Pasadena’s housing needs. A Zoning Code amendment would be required to incorporate the proposed amendments related to emergency shelter, emergency shelter, limited, Low Barrier Navigation Centers, and Safe Parking to regulate zoning and specific development standards for applicable sites.
2.4.2 Proposed Amendments
Emergency Shelters
The City is proposing to amend the definitions and standards associated with the land uses referred to as “Emergency Shelters” and “Emergency Shelters, Limited”. Under amended definitions in PMC Section 17.80.020, such land use s would no longer require clients to vacate the facilities each morning. The amended definition s would also no longer refer to the lack of guarantee for a bed. In addition, the maximum clien t capacity for Emergency Shelters, Limited land uses would increase from 12 to 40 persons. The proposed amendment to PMC Section
17.50.105 would also increase the maximum length of stay for clients from six to 12 continuous months. Per proposed amendments to PMC 17.46.040, o ne off-street parking space would be required per on-site staff member instead of per every four beds.
With implementation of the Project, emergency shelt ers and emergency shelters, limited, would be permitted in the following zones (refer to Figures 4 and 5):
Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Emergency Shelters (Permitted with Minor Conditional Use Permit)
CDSP SFOSP ECSP
(2022)
ECSP
(2003)
EPSP LASP FOOG NLSP OTHER
CD-1 SFO-CG EC-MU-C ECSP-CG-5 EPSP-d1-CG LA-MU-N FGSP-CL-1b SP-1a CO CD-2 SFO-CL EC-MU-G ECSP-CG-6 EPSP-d1-IG FGSP-C-3a SP-1b CL CD-3 SFO-CF EC-MU-N EPSP-d2-CG FGSP-C-3b SP-1c CL-2
CD-4 SFO-IF EPSP-d2-IG FGSP-C-3d SP-1e
CD-5 SFO-MU-C EPSP-d3-CG
CD-6 SFO-MU-N
SFO-MU-T
Note: Newly permitted zones are shown in red .
CDSP = Central District Specific Plan; SFOSP = South Fair Oaks Specific Plan; ECSP = East Colorado Specific Plan; EPSP = East Pasadena Specific Plan; LASP = Lincoln Avenue Specific Plan; FOOG = Fair Oaks/Orange Grove Specific Plan; NLSP = North Lake Specific Plan; CO = Commercial Office; CL/CL-2 = Commercial Limited Emergency Shelters, Limited (Permitted By-Right)
CDSP SFOSP ECSP
(2022)
ECSP
(2003)
EPSP LASP FOOG NLSP OTHER
CD-1 SFO-CG EC-MU-C EPSP-d1-IG LA-MU-N FGSP-CL-1b
CD-2 SFO-CL EC-MU-G FGSP-C-3a
CD-3 SFO-CF EC-MU-N FGSP-C-3b
CD-4 SFO-IF FGSP-C-3d
CD-5 SFO-MU-C
CD-6 SFO-MU-N
SFO-MU-T
Note: Newly permitted zones are shown in red .
CDSP = Central District Specific Plan; SFOSP = South Fair Oaks Specific Plan; ECSP = East Colorado Specific Plan; EPSP = East Pasadena Specific Plan; LASP = Lincoln Avenue Specific Plan; FOOG = Fair Oaks/Orange Grove Specific Plan; NLSP = North Lake Specific Plan
Low Barrier Navigation Centers
Signed in 2019, AB 101 requires that a Low Barrier Navigation Center development be a use by- right, as defined, in areas zoned for mixed uses an d nonresidential zones permitting multifamily uses if it meets specified requirements. Accordingly, the City is addressing Low Barrier Navigation Centers as part of a Zone Code Amendment. Under the proposed amended PMC Section
17.80.020, a Low Barrier Navigation Center land use would be defined as:
A housing first, low-barrier, service-enriched shelter focused on moving people into permanent housing that provides temporary living fa cilities while case managers connect individuals experiencing homelessness to income, public benefits, health services, shelter, and housing. “Housing First” cor e components are defined in Chapter 6.5, Section 8255 of Division 8 of the Welfare and Institutions Code. “Low Barrier” means the use of best practices to reduce barriers to entry, including allowing partners, pets, storage of personal items, and privacy measures.
The proposed amendment would provide the permitted zones and operational requirements for Low Barrier Navigation Centers. Specifically, Low B arrier Navigation Centers would be allowed as a permitted use in all zones permitting mixed-us e development and commercial zones permitting multifamily development (refer to Figure 6). As Low Barrier Navigation Centers are currently permitted by-right per Government Code Section 65660, the Project would formalize the Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
use of Low Barrier Navigation Centers in the City Zoning Code within the following zones:
Low Barrier Navigation Centers (Permitted By-Right)
CDSP SFOSP ECSP
(2022)
ECSP
(2003)
EPSP LASP FOOG NLSP OTHER
CD-1 SFO-CG EC-MU-C ECSP-CG-5 EPSP-d1-IG LA-MU-N FG SP-CL-1b SP-1a CO CD-2 SFO-CL EC-MU-G ECSP-CG-6 EPSP-d1-CO FGSP-C-3a SP-1b CL CD-3 SFO-CF EC-MU-N EPSP-d1-CL FGSP-C-3b SP-1c CL -2
CD-4 SFO-IF EPSP-d1-CG FGSP-C-3d SP-1e
CD-5 SFO-MU-C EPSP-d2-CO
CD-6 SFO-MU-N EPSP-d2-CL
SFO-MU-T EPSP-d2-CG
SFO-MU-G EPSP-d3-CO
EPSP-d3-CG
CDSP = Central District Specific Plan; SFOSP = South Fair Oaks Specific Plan; ECSP = East Colorado Specific Plan; EPSP = East Pasadena Specific Plan; LASP = Lincoln Avenue Specific Plan; FOOG = Fair Oaks/Orange Grove Specific Plan; NLSP = North Lake Specific Plan; CO = Commercial Office; CL/CL-2 = Commercial Limited
As proposed, Low Barrier Navigation Centers would be available to clients seeking shelter, their partners and/or dependents (if not a population-spe cific site, such as for survivors of domestic violence or sexual assault, women, or youth), and t heir pets for up to 12 continuous months. A program operator (i.e., an agency or organization) would facilitate, administer, oversee, and provide staffing and connect clients of the Low Bar rier Navigation Centers to services and permanent housing. The program operator would also have a written management plan with provisions for staff training, neighborhood outreac h, security, screening of clients to ensure compatibility with proposed services provided, coun seling, particularly for assisting in finding permanent housing and a source of income, training and treatment programs for clients, drug and alcohol dependency referrals, and an exit strategy. The management plan would be subject to the review and approval of the Zoning Administrator. Low Barrier Navigation Centers would also be required to comply with Chapter 6.5 (commencing with Section 8255) of Division 8 of the Welfare and Institutions Code 2 and operate with a “coordinated entry system” developed pursuant to Section 578.7(a)(8) of Title 24 of the Code of F ederal Regulations 3 to coordinate program participant intake, assessment, and referrals. Data would also be collected to record client stays, demographics, income, and exit destinations through the local Homeless Management Information System, as defined by Section 578.3 of Title 24 of the Code of Federal Regulations. 4 Safe Parking
The proposed amendment would provide the applicabil ity, definitions, allowed locations, application requirements, and performance standards requirements for the land use referred to as “Safe Parking.” The Safe Parking amendment would allow for the provision of designated off- street parking areas with a Minor Conditional Use P ermit for unhoused clients and families with vehicles, which is intended to be a safe place for temporarily parking overnight while the clients and families transition to permanent housing. Under the proposed amendment, Safe Parking (land use) would be defined as:
2 https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?sectionNum=8255.&nodeTreePath=14.10&la wCode=WIC
3 https://www.ecfr.gov/current/title-24/subtitle-B/c hapter-V/subchapter-C/part-578/subpart-B/section-578.7 4 https://www.ecfr.gov/current/title-24/subtitle-B/c hapter-V/subchapter-C/part-578/subpart-A/section-578.3 Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
A parking program, operated on property located outside of the public right-of-way and managed by a social service provider, that prov ides individuals and families with vehicles a safe place to park overnight while working towards a transition to permanent housing.
Safe Parking locations would be provided by a Progr am Operator, which is an agency or organization that would facilitate, administer, oversee, and provide staffing for Safe Parking uses.
Furthermore, Safe Parking programs would be require d to meet specific requirements and performance standards. These criteria are detailed below.
Allowed Locations
Safe Parking would be conditionally permitted as an accessory use on sites occupied by a Religious Facility where the Religious Facility is the primary use as well as on sites occupied by a Public and Semi-Public use, as defined in Section 17.80.020, excluding Religious Facilities.
Safe Parking would be prohibited on RS (Single-Fami ly Residential) or RM (Multi-Family Residential) zoned property where a Religious Facility is not the primary use (refer to Figure 7).
Requirements
Under the Safe Parking amendment, the program opera tor must include a written management plan for the Safe Parking program. The plan must in clude a site plan indicating the location of trash and recycling facilities, water, restroom facilities, exterior lighting, location and distances to residential properties, location of nearest public transportation, and location of designated overnight parking spaces. The plan must also includ e the hours of operation, total number of vehicles to be served on-site, monitoring and overs ight program, and a neighborhood relations plan. In addition to the total number of vehicles to be served on-site, there must be one off-street parking space per staff member.
Performance Standards
Performance standards proposed by the Safe Parking amendment would include standards for case management, sanitation, residency preference, buffer from residential uses, authorized vehicles, and written agreement. A Safe Parking program would be allowed by a program operator that is currently participating in, or willing to p articipate in the Pasadena Continuum of Care Program and provides access or linkage to the Coordinated Entry System. The standards would also require that restroom, water, and trash facilities be provided and maintained during the Safe Parking hours of operation. Most safe parking sites, if not all, would use existing on-site restroom facilities or would bring in portable restrooms. Cl ients or families who could show proof of residency in Pasadena or adjacent cities would be g iven preference for any available spots.
Standards for the residential buffer would require that vehicles maintain a minimum distance of 50 feet from any property that contains a residential use as the primary use, with exceptions that may be approved by the Director of Planning and Com munity Development. Only vehicles registered in the Safe Parking program would be all owed to park in the designated spots during program hours. Additionally, participants would be required to enter into a written agreement with the Program Operator, which would provide terms and conditions for the Safe Parking program.
Reasonable Accommodation Policy and Procedures
As proposed, Reasonable Accommodation Policy and Procedures, would replace the procedures in Section 17.61.080.I, Modifications for individuals with disabilities, of the PMC. Currently under Chapter 2: Project Description Emergency Shelter a nd Other Code Amendments
Addendum to the Pasadena General Plan EIR April 2023
Section 17.61.080.I, Modifications for individuals with disabilities, the request for reasonable modifications would require a public hearing. The p roposed Reasonable Accommodation Policy and Procedures amendment would establish a procedure for persons with disabilities seeking fair access to housing to make requests for reasonable a ccommodation when the application of a zoning law or other land use regulation, policy, or practice acts as a barrier to fair housing opportunities for persons with disabilities. The re quest would be submitted on an official City application form that would be reviewed by the Director of Planning and Community Development, or their designee, who would be able to grant, modi fy, or deny the request. The modifications would not be granted to any applicable development standard relating to density, floor area ratio, gross floor area, or lot coverage. Additionally, th e modification would not be granted if it would require a fundamental alteration in the City’s over all land use and zoning, or result in a direct threat to the health and safety of other persons or physical damage to the property of others. The modification would be an accommodation for an individual and would not run with the land.
Design Review Thresholds
The proposed Design Review amendment would add a pr ovision to PMC Section 17.61.030 for sites identified in previous Housing Elements and included in the current Housing Element’s Sites Inventory (refer to Figure 8). With this amendment, previously identified sites that include at least 20 percent of housing units for lower-income households and which do not require a subdivision would be exempt from discretionary design review an d subject to by-right approval. By-right approval in this case means that projects cannot by subject to discretionary review or CEQA.
Since the City’s Design Review process is considered discretionary and subject to CEQA, projects in this category cannot be subject to Design Review . This is the City’s current practice, and this amendment memorializes the practice. As the adopted Housing Element states that these sites are not subject to design review, the Project would formalize this practice in the City Zoning Code.
Objective development standards may be applied thro ugh ministerial review. These previously identified sites have already been considered in the certified 2015 GP EIR.
Chapter 3: Evaluation of Environmental Impacts Eme rgency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
CHAPTER 3
EVALUATION OF ENVIRONMENTAL IMPACTS
The following evaluation assesses the environmental impacts of the proposed Emergency Shelter and Other Code Amendments in relation to the analys is provided in the 2015 GP EIR.
Determinations are made as to whether the proposed project would result in new significant impacts or substantially more severe effects, which would trigger the need for a Subsequent or Supplemental EIR.
For each threshold identified below, the following questions are addressed and discussed in the narrative for each issue:
What is the impact conclusion of the Emergency Shelter and Other Code Amendments? For each impact identified below, a level of significance of the impact is provided. While criteria for determining significant impacts are unique to each issue area, the environmental analysis applies a uniform classification of the impacts bas ed on the following definitions consistent with CEQA and its’ implementing CEQA Guidelines:
• No Impact (NI) – A designation of no impact is given when no chan ges in the environment would occur.
• Less than Significant Impact (LTS) – A less than significant impact would cause no substantial adverse change in the environment.
• Less than Significant Impact with Mitigation (LTS-M ) – A less than significant impact with mitigation incorporated avoids substant ial adverse impacts on the environment with adherence to identified mitigation measures. For those issue areas where the impact of the proposed project would be l ess than significant with the incorporation of the same mitigation measure(s) ide ntified in the GP EIR, the impact is identified as LTS-M(GP) . The number of the mitigation measure from the GP EIR MMRP will be referenced and summarized in Chapter 4.
• Significant and Unavoidable Impact (S-U) – A significant unavoidable impact would cause a substantial adverse effect on the environme nt, and no feasible mitigation measures would be available to reduce the impact to a less than significant level.
What is the GP EIR impact conclusion? The issues th at were found to be either less than significant or were found to have no impact in the Initial Study (IS) prepared for the GP Update and were therefore excluded from further analysis i n the GP EIR, are identified with “(IS)” after the impact conclusion.
Do the Emergency Shelter and Other Code Amendments involve new significant impacts or substantially more severe impacts than those analyzed in the GP EIR? Are there any new or changed circumstances involvin g new significant impacts or substantially more severe impacts than those analyzed in the GP EIR?
Is there any new information of substantial importa nce that was not and could not have been known at the time of certification of the GP EIR that rises to the level of requiring new analysis or verification?
Are any new mitigation measures required for the Em ergency Shelter and Other Code Amendments?
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency Shelter
and Other Code
Amendments Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
I. AESTHETICS.
Would the project:
a) Have a substantial adverse
effect on a scenic vista? LTS LTS No No No No
b) Substantially damage scenic
resources, including, but not
limited to, trees, rock
outcroppings, and historic
buildings within a state scenic
highway?
LTS LTS (IS) No No No No
c) Substantially degrade the
existing visual character or
quality of the site and its
surroundings?
LTS LTS No No No No
d) Create a new source of
substantial light or glare which
would adversely affect day or
nighttime views in the area?
LTS LTS No No No No
Discussion:
The GP EIR concluded that implementation of the app roved General Plan Update would result in less than significant environmental impacts to aesthetics. While buildout of the General Plan would change the visual appearance of parcels in all areas of the Cit y and its Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency Shelter
and Other Code
Amendments Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
sphere of influence by allowing new development or redevelopment, the GP EIR stated that the City’s specific plan areas are most likely to experience changes in visual appearance and aesthetic character. The GP EIR found that development in accordance with the General Plan Land Use Element would not propose changes in the City’s topography, tall buildings that would block views, or the redevelopment of entire neighborhoods. Additionally, the overall visual appearance and character of older, single-fa mily residential neighborhoods is expected to remain intact, and no major obstructions of scenic views are anticipated. Scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway were addressed in the IS prepa red for the GP EIR, which found that impacts to this topic would be less than significant following the implementation of the General Plan Update. The GP EIR determined that although permitted development under the approved General Plan Update could result in increased light and glare, new development would be required to comply with the standards of t he Municipal Code, design guidelines, Land Use Elem ent policies that require that lighting be shielded and efficient, and other regul ations related to light and glare. Thus, the GP EIR found this issue to be less than significant. Overall, the GP EIR concluded that proposed land use changes in the General Plan Update would not adversely impact visual and scenic quality.
As detailed in Section 2.4.2, the proposed amendments for emergency shelters, emergency shelters, limited, and Low Barrier Navigation Centers would allow new uses in certain specific plan areas. Emergency shelters would be allowed with a Minor Conditional Use Permit in the South Fair Oaks Specific Plan, Lincoln Avenue Specific Plan, Fair Oaks/Orange Grove Specific Plan, and North Lake Specific Plan areas in zones where they previously were not allowed. Additionally, emergency shelters would be allowed with a Minor Conditional Use Permit in commercial office (CO) and commercial limited (CL, CL-2) districts where they previously were not allowed. Emergency shelters, limited, would be allowed by-right in the Central D istrict Specific Plan (previously only allowed in C D-6), East Colorado Specific Plan, Lincoln Avenue Specific Plan, and Fair Oaks/Orange Grove Specific Plan areas in zones where they were previously not allowed. The proposed amendments do not include any new criteria for development standards. However, future development of emergency shelters and emergency shelters, limited located within the specific plan areas would be required to comply wit h the General Plan policies and applicable specific plan design guidelines for context-sensitive design to ensure less than significant impacts related to aesthetics. Low Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency Shelter
and Other Code
Amendments Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Barrier Navigation Centers would be allowed by-righ t in specific plan areas in areas zoned for mixed u ses and nonresidential zones permitting multifamily uses, subject to operational requirements. The proposed amendment does not include any criteria for development standards. However, similar to development analyzed under the GP EIR, future development of Low Barrier Navigation Centers located within the specific plan areas would be required to comply with the General Plan policies and applicable specific plan design guidelines for context-sensitive design to ensure less than significant impacts related to aesthetics.
For safe parking uses, it is anticipated that the S afe Parking program would be located in existing pa rking lots, and would not result in any impacts related to aesthetics. No obstructions of scenic views are anticipated, similar to the uses analyzed in the GP EIR. The carried forward Housing Element sites were part of the buil dout scenario previously analyzed under the GP EIR and, thus, no new or different environmental impacts would occur from the proposed change in the City’s approval process for these sites. Furthermore, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in impacts related to aesthetics.
Similar to the GP EIR, development pursuant to the proposed amendments for emergency shelters, emergen cy shelters, limited, Low Barrier Navigation Centers, and carried forward Housing Element sites would generate new sources of li ght and glare that could affect day or nighttime views in the City from increased development intensities. It is not anticipated that safe parking uses would result in new light and glare impacts as the sites for safe parking uses would be located in existing parking lots with exterior lighting. However, similar to the development analyzed under the GP EIR, new development would be required to comply with standards outlined in the Municipal Code, design guidelines, Land Use Element policies that require lighting to be shielded and efficient, and other regulations related to light and glare. Furthermore, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in impacts related to light an d glare. Therefore, similar to the GP EIR, the prop osed amendments would result in less than significant impacts related to light and glare.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency Shelter
and Other Code
Amendments Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Additionally, as determined in the IS, impacts to scenic highways would be less than significant, which would be similar for implementation of the proposed amendments. No potential sites asso ciated with the proposed amendments are located nea r State Route 2, an area designated for open space. The potential sites that are located adjacent or near State Route 110 are currently built out and the removal of significant trees, rock outcroppings, or any historic buildings would not occur, and therefore, would be consistent with the General Plan Update. Therefore, the proposed amendments would result in less than significant impacts to state scenic highways.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new info rmation of substantial importance requiring new ana lysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
II. AGRICULTURAL RESOURCES.
Would the project:
a) Convert Prime Farmland, Unique
Farmland, or Farmland of
Statewide Importance (Farmland),
as shown on the maps prepared
pursuant to the Farmland
Mapping and Monitoring Program
of the California Resources
Agency, to non-agricultural use?
NI NI (IS) No No No No
b) Conflict with existing zoning for
agricultural use, or a Williamson
Act contract?
NI NI (IS) No No No No
c) Conflict with existing zoning for, or
cause rezoning of, forest land (as
defined in Public Resources Code
Section 12220[g]), timberland (as
defined by Public Resources
Code Section 4526), or
timberland zoned for Timberland
Production (as defined by
Government Code Section
51104[g])?
NI NI (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
d) Result in the loss of forest land or
conversion of forest land to
non-forest use?
NI NI (IS) No No No No
e) Involve other changes in the
existing environment which, due
to their location or nature, could
result in conversion of Farmland,
to non-agricultural use?
NI NI (IS) No No No No
Discussion:
Agriculture and forestry resources were addressed in the IS prepared for the GP EIR, which found that impacts to this topic would be less than significant following the implementation of the General Plan Update. The City of Pasadena has no farmland, land zoned for agricultural use, Williamson Act contracts, timberland or Timberland production, or forest land. The IS also stated that the Zoning Code permits commercial growing in general commercial (CG), commercial limited (CL), and general industrial (IG) zones and conditionally in the single-family residential (RS) and multi-fam ily residential (RM) designated zoning districts an d certain specific plan areas; however, the General Plan Update did not alter uses permitted by the Zoning Code, and the objectives o f the General Plan Update did not relate to or conflict with commercial growing. 5 Therefore, the General Plan Update did not have any impacts to agriculture and forestry resources.
As no farmland, land zoned for agricultural use, la nd with Williamson Act contracts, timberland, or fo rest land exists within the City, development of emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and sa fe parking uses as well as
5 City of Pasadena, Initial Study/Notice of Prepara tion, 2013.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
the carried forward Housing Element sites would not convert or conflict with the Zoning Code for land zoned for agricultural use, land with Williamson Act contracts, farmland, timberland , or forest land. The proposed amendments to the Zo ning Code for emergency shelters and emergency shelters, limited, would allow new emergency shelter uses with a Minor Conditional Use Permit in the South Fair Oaks Specific Plan area in general commercial (CG) and commercial limited (CL) zones, Fair Oaks/Orange Grove Specific Plan area in commercial limited (CL) zones, and other commercial limited (CL, CL-2) districts; and new emergency shelter, limited uses by- right in the Fair Oaks/Orange Grove Specific Plan a rea in commercial limited (CL) zones. Additionally, the proposed amendment for Low Barrier Navigation Centers would include a new land use that would allow for Low Barrier Navigation Centers by-right in all zones permitting mixed-use development and commercial zon es permitting multifamily development, which includ e zones that allow commercial growing: general commercial (CG), commercial limited (CL), and one general industrial (IG) zone (i.e., EPSP-d1-IG). The proposed safe parking amendment would include a new land use that would allow for safe parking with a Minor Conditional Use Permit as an accessory use on sites occupied by a Religiou s Facility as the primary use and on sites occupied by Public and Semi-Public uses. This may include zones that allow commercial growing. However, none of the proposed amendments include land use provisions or regulations related to commercial growing. Therefore, the proposed amendments would result in no impact to agricultural resources.
In addition, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not impact agricultural resources.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency Shelter
and Other Code
Amendments Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
III. AIR QUALITY.
Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project:
a) Conflict with or obstruct
implementation of the
applicable air quality plan?
S-U S-U No No No No
b) Violate any air quality standard
or contribute to an existing or
projected air quality violation?
S-U S-U No No No No
c) Result in a cumulatively
considerable net increase of
any criteria pollutant for which
the project region is non-
attainment under an applicable
federal or state ambient air
quality standard?
S-U S-U No No No No
d) Expose sensitive receptors to
substantial pollutant
concentrations?
LTS-M(GP) LTS-M No No No No
e) Result in other emissions (such
as those leading to odors)
adversely affecting a
substantial number of people?
LTS LTS-M No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency Shelter
and Other Code
Amendments Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Discussion:
The GP EIR found that potentially significant impacts to air quality would occur if mitigation measures were not incorporated; in some instances, the GP EIR found impacts to air quality to be significant and unavoidable because no feasible mitigation measures would be available to reduce impacts to a less than signific ant level. The City of Pasadena is entirely within the South Coast Air Basin (SCAB) and therefore must comply with the rules and regula tions imposed by the South Coast Air Quality Manage ment District (SCAQMD).
The SCAB is also subject to the California Ambient Air Quality Standards adopted by the California Air Resources Board (CARB) and the National Ambient Air Quality Standards adopted by the federal government. The SCAB is designated a nonattainment area (i.e., an area that does not meet the ambient air quality standards) for ozone (O 3), fine inhalable particulate matter (PM 2.5 ), and coarse inhalable particulate matter (PM 10 ) under the California Ambient Air Quality Standard s, and a nonattainment area for O 3, PM 2.5 , and lead (Los Angeles County only) under the National Ambient Air Quality Standards. The GP EIR concluded that buildout of the General P lan Update would increase employment and population beyond current SCAG forecasts and contribute to cumulative SCAB nonattainment designations. While certain aspects of the General Plan Update Land Use Plan would lead to improvements in transportation and thus decrease emissions from that source, the GP EIR found that even with implementation of GP EIR Mitigation Measure 2-1, requiring the preparation of a technical assessment evaluating potential project construction-related air quality impacts to the City Planning Division prior to issuance of construction permits, and GP E IR Mitigation Measure 2-2, requiring the preparatio n of a technical assessment evaluating potential project operation-related air quality impacts to the City Planning Division prior to project approval, construction and operation impacts would not be reduced below the re quired SCAQMD thresholds, and that future impacts c ould be significant and unavoidable. The GP EIR stated that although submission of a technical assessment for possible construction related impacts required by GP EIR Mitigation Measure 2-1 could reduce criteria air pollutant impacts for individual projects, the cumulative impact of all future construction emissions would result in significant and unavoidable impacts. In relation to the operation of buildout, the GP EIR stated that future activity would exceed SCAQMD thresholds as well, and that while GP EIR Mitigation Measure 2-2 requiring the submission of an emissions assessment for operation-related im pacts for individual future development projects, c ould reduce individual project Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency Shelter
and Other Code
Amendments Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
impacts, the cumulative impacts of the General Plan Update buildout would be significant and unavoidab le. The GP EIR found that implementation of the General Plan Update could expose existing or planned sensitive receptors to criteria air pollutants and toxic air contaminants, but that GP EIR Mitigation Measure 2- 3, requiring the submittal of a Health Risk Assessm ent (HRA) for certain new industrial or warehousing land uses requiring use o f diesel trucks within 1,000 feet of a sensitive la nd use prior to project approval, would ensure that mobile sources of toxic air conta minants not covered under SCAQMD permits would be c onsidered during subsequent project-level environmental review. The HRA prepared for those projects identified under GP EIR Mitigation Measure 2-3 would identify project-specific measures to minimiz e health risk and individual projects would be requ ired to achieve the incremental risk thresholds established by SCAQMD, thus reducing impacts to a less than significant level. This, h owever, would only reduce the impact on a project-by-project basis, and the GP EI R concluded that the future buildout of the General Plan Update would result in cumulative impacts to sensitive receptors that are significant and unavoidable. The GP EIR found that GP EIR Mitigation Measure 2-4 would require that major sources of air pollutants achieve incremental risk thresholds when placed near a sensitive receptor, and GP EIR Mitigation Measure 2-5 practice measures to minimize odors, reducing both impacts to a less than significant level.
The emergency shelters, emergency shelters, limited , Low Barrier Navigation Centers, and safe parking uses as well as the carried forward Housing Element sites would apply to sites that are located within the City of Pasadena and thus, within the bounds of the area analyzed by the GP EIR; however, sites associated with the proposed uses only account for a small portion of the City analyzed under the GP EIR. Under the project, zones that permit emergency shelters with a Minor Conditional Use Permit would be expanded to now include specific zones within the South Fair Oaks Specific Plan, Lincoln Avenue Specific Plan, Fair Oaks/Orange Grove Specific Plan, and North Lake Specific Plan areas as well as commercial office (CO) and commercial limited (CL, CL-2) districts; and zones that permit emergency shelters, limited, by-right would be expanded to include specific zones in the Central District Specific Plan, East Colorado Specific Plan, Lincoln Avenue Specific Plan, and th e Fair Oaks/Orange Grove Specific Plan areas. The n ewly proposed Low Barrier Navigation Centers would be permitted in all zones permitting mixed-use development and commercial zon es permitting multifamily development, subject to operational requirements. T he newly proposed safe parking uses would only be a llowed with a Minor Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency Shelter
and Other Code
Amendments Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Conditional Use Permit use on sites occupied by a religious facility as the primary use and those occupied by a Public or Semi-public use excluding religious facilities. Similar to the impacts addressed in the GP EIR, impacts to air qua lity from the buildout of the sites associated with the proposed amendments would be less than significant for each individual project (and will be analyzed on a project- by-project basis), but the magnitude of future buildout could result in cumulative impacts that are significant and unavoidable. GP EIR Mitigation Measures 2-1, 2-2, and 2-4 would be appl icable to development of the sites for emergency sh elters, emergency shelters, limited, Low Barrier Navigation Centers, and carrie d forward Housing Element sites. It is not anticipa ted that implementation of safe parking uses would require mitigation measures as the sites would be located in existing parking lots and would not require construction or operational uses that could generate air quality emissions. Additionally, the proposed changes for Reasonable Accommodation Policy and Procedures would be procedural in nature and would not impact air quality. Implementation of the proposed development of emergency shelters, emergency shelters, limited, Lo w Barrier Navigation Centers, and carried forward H ousing Element sites in accordance with the GP EIR mitigation measures would not result in increased impacts from those identified in the GP EIR, and given that the sites that would be developed pursuant to the proposed amendments for emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and carried forward Hou sing Element sites is pointedly small, and with a r educed built out capacity than that analyzed under the GP EIR, the proposed amendments would be anticipated to result in less impacts compared to those identified in the GP EIR.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur, nor would the significant unav oidable impacts identified in the GP EIR be worsene d. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not pro pose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
IV. BIOLOGICAL RESOURCES
Would the project:
a) Have a substantial adverse effect,
either directly or through habitat
modifications, on any species
identified as a candidate,
sensitive, or special status
species in local or regional plans,
policies, or regulations, or by the
California Department of Fish and
Wildlife or U.S. Fish and Wildlife
Service?
LTS-M(GP) LTS-M No No No No
b) Have a substantial adverse effect
on any riparian habitat or other
sensitive natural community
identified in local or regional
plans, policies, regulations, or by
the California Department of Fish
and Game or U.S. Fish and
Wildlife Service?
LTS-M(GP) LTS-M No No No No
c) Have a substantial adverse effect
on state or federally protected
wetlands (including, but not limited
to, marsh, vernal pool, coastal,
LTS-M(GP) LTS-M No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
etc.) through direct removal, filling,
hydrological interruption, or other
means?
d) Interfere substantially with the
movement of any native resident
or migratory fish or wildlife species
or with established native resident
or migratory wildlife corridors, or
impede the use of native wildlife
nursery sites?
LTS LTS (IS) No No No No
e) Conflict with any local policies or
ordinances protecting biological
resources, such as a tree
preservation policy or ordinance?
NI NI (IS) No No No No
f) Conflict with the provisions of an
adopted Habitat Conservation
Plan, Natural Community
Conservation Plan, or other
approved local, regional, or state
habitat conservation plan?
NI NI (IS) No No No No
Discussion:
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
The GP EIR identified areas within the boundaries of the General Plan Update area where sensitive natural habitats occur to varying degrees, including Arroyo Seco, Eaton Canyon Corridor, Hastings Canyon, the San Rafael Hills, and a tract of land at the northwest of the intersection of Crestford Drive and Florecit a Drive; however, the land use changes included wit hin the General Plan Update would be confined to the eight specific plan areas within the City, none of which contain sensitive natural habitats and all of which are urbanized or suburban in character. Yet, because Ar royo Seco, Eaton Canyon Corridor, Hastings Canyon, and the San Rafael Hills all contain sensitive natural habitats, the GP EIR concluded that buildout of the General Plan Update could cause potentially significant impacts to biological resources. The GP EIR found t hat Arroyo Seco, Eaton Canyon, and Hastings Canyon all contain jurisdictional waters, and that the San Rafael Hills contain ripar ian and/or wetland habitat. No land use changes wer e proposed in these areas, however, the GP EIR states that buildout of the Gen eral Plan Update could have potentially significant impacts to sensitive species, sensitive natural communities, and jurisdictional waters and/or wetlands. GP EIR Mitigation Measures 3-1 through 3-6 would ensure that a qualified biologist would be involved in the assessment, mitigation, and monitoring of all projects occurring on land where impacts to biological resources could be potentially signif icant; impacts would then be reduced to a less than significant level following implementation of the mitigation measures. The IS prepared for the GP EIR found that development projects approved under the GP Update, including within the City’s eight specific plan areas, would be required to comply with the Ci ty’s Master Street Tree Plan, Chapter 17.44 (Landscaping) of the City’s Zoning Code, and the Migratory Bird Treaty Act, as applicable. As such, the General Plan Update’s impact on overland wildlife movement and migration would be less than significant and the General Plan Update would not conflict with the City’s tree protection ordinance. Additionally, the IS prepared for the GP EIR indic ated that there are no adopted habitat conservation or natural community conservation plans within the City and, as such, concluded t hat no impacts to such plans would result from the General Plan Update.
As stated in the GP EIR, proposed land use changes would be confined to the eight specific plan areas in the City, including the several specific plan areas to which the proposed a mendments for the emergency shelters, emergency she lters, limited, and Low Barrier Navigation Centers would apply. However, th e proposed amendments would also allow for emergenc y shelters with a Minor Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Conditional Use Permit within commercial office (CO ) and commercial limited (CL, CL-2) districts, of w hich future development was accounted for in the GP EIR as areas with no specific plan designation. Additionally, the proposed safe parking uses would be allowed with a Minor Conditional Use Permit as an accessory use on sites occupied by a Religious Facility where the Religious Facility is the primary use, and on sites occupied by a Public or Semi-Public use, of which future development was accounted for in the GP EIR as areas with no specific plan designation. The carrie d forward Housing Element sites were part of the bu ildout scenario previously analyzed under the GP EIR and, thus, no new or different environmental impacts would occur from the proposed change in the City’s approval process for these sites. As discussed in t he GP EIR, there are no natural habitats or sensiti ve species in the specific plan areas, and development pursuant to the proposed ame ndments in these areas would not result in impacts to sensitive biological resources. Additionally, the GP EIR concluded that the specific plan areas did not contain any jurisdi ctional waters or wetlands. The proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature a nd would not result in impacts to sensitive biological resources.
As discussed, the GP EIR identified areas within th e boundaries of the General Plan Update area where sensitive natural habitats occur to varying degrees, including Arroyo Seco, Eaton Canyon Corridor, Hastings Canyon, the San Rafael Hills, and a tract of land at the northwest of the intersection of Crestford D rive and Florecita Drive. The proposed safe parking uses would apply to sites that are zoned PS, which include sites located in the Sa n Rafael Hills and a tract of land at the northwest of the intersection of Crestford Drive and Florecita Drive. Those sites are develope d with Institutional Uses (Art Center College of De sign campus, Linda Vista Elementary School, and Odyssey Charter School), and the Safe Parking program could be a conditionally permitted use at these sites.
However, if safe parking uses would be implemented, they would be located in existing parking lots and would not require construction or operational uses that could impact sensitive nat ural habitats. Similar to the GP EIR, no other chan ges are proposed within the boundaries of any sites designated as Open Space under the General Plan, and implementation of the proposed amendments would not impact sensitive biological resources in these areas. Additionally, implementation of the proposed amendments would not impact jurisdictional waters or wetlands in Arroyo Seco, E aton Canyon, or Hastings Canyon as no land uses cha nge or development is Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
proposed in these areas. However, riparian and/or wetland habitats occur in several small drainages in the San Rafael Hills, including the PS (Public, Semi-Public) zones within the San R afael Hills. GP EIR Mitigation Measures 3-1 through 3-6 would be applicable should development of these sites be necessary for the proposed safe parking uses. The proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in impacts to sensitive natural habitats.
Similar to the General Plan Update, development pursuant to the proposed amendments would be required to comply with the City’s Master Street Tree Plan, Chapter 17.44 (Landscaping ) of the City’s Zoning Code, and the Migratory Bird Treaty Act, as applicable.
Therefore, development pursuant to the proposed amendments would not conflict with the City’s tree protection ordinance and impacts to wildlife movement and migration would be less th an significant. Additionally, as indicated in the I S prepared for the GP, there are no adopted habitat conservation or natural community conservation plans within the City. Therefore, the proposed amendments would not result in impacts to any such plans.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
V. CULTURAL RESOURCES
Would the project:
a) Cause a substantial adverse
change in the significance of a
historical resource pursuant to
CEQA Guidelines Section
15064.5?
LTS-M(GP) LTS-M No No No No
b) Cause a substantial adverse
change in the significance of an
archaeological resource pursuant
to CEQA Guidelines Section
15064.5?
LTS-M(GP) LTS-M No No No No
c) Directly or indirectly destroy a
unique paleontological resource
or site or unique geologic feature?
LTS-M(GP) LTS-M No No No No
d) Disturb any human remains,
including those interred outside of
formal cemeteries?
LTS LTS No No No No
Discussion:
The GP EIR found that, while the General Plan Updat e did not propose the alteration or demolition of a ny historic landmarks, any development under buildout of the General Plan Update could potentially impact a historic resource, as the GP EIR lists 7,440 historical Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
resources throughout the City which meet at least one state or national criteria. The GP EIR states that the likelihood of encountering and impacting a historical resource is greater with in a historic district, and that any specific plan area that is within or adjacent to a historic district has a greater likelihood for impa cting historical resources. The Central District, N orth Lake, and Fair Oaks/Orange Grove Specific Plan areas contain and/or are adjace nt to historic landmarks and/or historic districts. The GP EIR states that future projects under the buildout of the General Plan Update can avoid significantly impacting historical resources by adhering to the PMC
17.61.030 design review, to state and federal regulations, and to the policies of the City’s Land Use Element, including Policy LU 8.5, Scale and Character of New Construction in Designated Landmark and Historic Districts. Additionally, GP EIR Mitigation Measure 9- 4 would ensure that vibrations from construction activity would not impact architectural structures of historical significance. Impacts to archaeological resources can be reduced to a less than significant level upon implementation of GP EIR Mitigation Measure 4-1, which would halt construction upon discovery of an archaeological resource and require consultation with a registered archaeologist before proceeding with development. The GP EIR lists the Topanga Formation as an area sensitive to paleontological resources and states that implementation of GP EIR Mitigation Measure 4-2, which would enlist the service of a registered paleontologist prior to any grading activity in the vicinity of this area, as a sufficient measure to reduce the impact to a less than significant level. The GP EIR concluded that grading activities within the General Plan Update area are not expected to disturb human remains.
The proposed amendments for emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and carried forward Housing Element sites would apply to sites that are located within the City of Pasadena and thus, with in the bounds of the area analyzed by the GP EIR. Sites associated with the proposed amendments are located throughout the City and may be adjacent to or within a landmark or historic district within the City, specifically in the Central District, North Lake, and Fair Oaks/Orange Grove Specific Plan areas. However, similar to the GP EIR, develop ment pursuant to the proposed amendments can avoid significantly impacting historical resources by adhering to the PMC 17.61.030 design review, to state and federal regulations, and to the policies of the City’s Land Use Element, including Policy LU 8.5, Scale and Character of New Construction in Designated Landmark and Historic Districts.
Additionally, implementation of GP EIR Mitigation M easure 9-4 would ensure that vibrations from constr uction activity adjacent to Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
historic buildings would not impact architectural structures of historical significance. While the proposed amendment for safe parking uses would apply to sites that are located within the City of Pasadena, it is not anticipated that safe parking uses would impact historical resources as the sites would be located in existing parking lots and would not require construction th at could impact architectural structures of historical significance. The proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not impact historic resources.
If archaeological resources are discovered during c onstruction of any project that would be developed pursuant to the proposed amendments, GP EIR Mitigation Measure 4-1 would be implemented, and the impact level would be less than significant. Except for a small area located at the southwest portion of th e City, the sites associated with the proposed emer gency shelters, emergency shelters, limited, Low Barrier Navigation Centers are not located in a sensitive paleontological area.6 While the proposed amendment for safe parking uses could include sites located in a sensitive paleontological area, it is not anticipated that safe parking uses would impact paleontological resources as the sites would be located in existing parking lots and would not require construction, or in particular, excavation that could encounter or impact such resources. The proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and wo uld not impact paleontological resources. Nonethele ss, for future projects developed within paleontologically sensitive areas pursuant to the proposed ordinance, GP EIR Mitigation Measure 4-2 would apply, which would ensure any impacts to paleontological r esources would be less than significant. As the pro posed emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and carried forward Housing Element sites would apply to sites that are located within the City of Pasadena and, thus, with in the area analyzed in the GP EIR which is not lik ely to contain unknown human remains, with the required compliance with Health and Safety Code, implementation of the proposed ordinance would not significantly impact human remains. While the proposed amendment for safe parking uses would apply to sites that are located within the City of Pasadena, it is not anticipated that safe parking uses would impact archaeological resources as the sites would be located in existing
6 City of Pasadena. 2015 General Plan EIR. Figure 5 .4-2: Paleontological Sensitivity .
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
parking lots and would not require construction that could impact archaeological resources. The proposed change for the Reasonable Accommodation Policy and Procedures would be proced ural in nature and would not impact archaeological resources or human remains.
The current CEQA Guidelines Appendix G checklist also includes assessment criteria for potential impacts to tribal cultural resources.
Tribal cultural resources are defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object wit h cultural value to a California Native American tribe. These types of resources were analyzed in the GP EIR and Native American consultation was conducted. No sacred lands were identified during consultation in the City of Pasadena. The GP EIR concluded that the results of the Native American consultation did not result in new information or unknown impacts, but that while there are no known sacred lands within the City, the potential to uncover archaeological resources durin g grading remains. Development in accordance with t he proposed amendments would implement GP EIR Mitigation Measure 4-1 if an y archaeological resources, including tribal cultural resources, are discovered during construction, reducing the impact level to less than significant.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
VI. ENERGY
Would the project:
a) Conflict with adopted energy
conservation plans? LTS LTS (IS) No No No No
b) Use non-renewable resources in
a wasteful and inefficient manner? LTS LTS (IS) No No No No Discussion:
Energy was not addressed in the GP EIR, as the IS p repared for the GP EIR found that impacts to this t opic from buildout of the General Plan would be less than significant. The IS stated that Pasadena’s Department of Water and Power (PWP) had the capacity to service the projected buildout of the General Plan Update. 7 Additionally, the IS stated that the City of Pasadena is wholly within the bounds of a Southern California Gas Company service area. Forecasted use from the buildout of the Gene ral Plan Update – which would be an increase in energy use - was found to b e within the capacity of existing facilities. 8 All new development and tenant improvements would be required to comply with the C alifornia Energy Code, Part 6 of the California Bui lding Standards Code (Title 24), CALGreen standards, Leadership in Energy and Environmental Design (LEED) standards, the City’s Green Action Plan, the City’s Green Building Standards Code (14.04.504), and the Open Space and Conservation Element of the General Plan, which together would increase efficiency and decrease consumption levels compared to existing structures built under the 2008 Building and E nergy
7 City of Pasadena, Initial Study/Notice of Prepara tion, 2013. 8 City of Pasadena, Initial Study/Notice of Prepara tion, 2013.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Efficiency Standards or targets established prior to those standards. 9 As such, the intensification of energy use resulting from buildout of the General Plan Update would result in a less than significant impact.
The proposed amendments for emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and safe parking as well as the carried forward Housing Element sites w ould apply to sites that are located within the Cit y of Pasadena and thus, within the bounds of the area analyzed by the IS and GP EI R. The proposed amendments for emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers would allow new short-term lodging and temporary living facilities in zones where these uses were not previously allowed, and thereby could pote ntially increase demand in energy over existing con ditions. It is anticipated that the safe parking uses would be located in areas wit h existing restroom facilities and exterior lightin g, and as such, would nominally increase energy demand over existing conditions due to the overnight operation of the restroom facilities. However, given that the sites that would be developed pursuant to the proposed amendments is pointedly small compared to the build out capacity analyzed under the GP EIR, this increase in development is not expected to exceed forecasted use captured under the IS and GP EIR. Additionally, the proposed amendments for emergency shelters, eme rgency shelters, limited, Low Barrier Navigation Ce nters, safe parking, and carried forward Housing Element sites would not con flict with any adopted energy conservation plans. F urthermore, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not affect energy resources.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
9 City of Pasadena, Initial Study/Notice of Prepara tion, 2013.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
VII. GEOLOGY AND SOILS
Would the project:
a) Expose people or structures to
potential substantial adverse
effects, including the risk of loss,
injury, or death involving:
i. Rupture of a known
earthquake fault, as delineated
on the most recent Alquist-
Priolo Earthquake Fault
Zoning Map issued by the
State Geologist for the area or
based on other substantial
evidence of a known fault?
Refer to California Geological
Survey Special Publication 42.
LTS LTS (IS) No No No No
ii. Strong seismic ground
shaking? LTS LTS (IS) No No No No
iii. Seismic-related ground failure,
including liquefaction as
delineated on the most recent
Seismic Hazards Zones Map
issued by the State Geologist
for the area or based on other
LTS LTS (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
substantial evidence of known
areas of liquefaction?
iv. Landslides as delineated on
the most recent Seismic
Hazards Zones Map issued by
the State Geologist for the
area or based on other
substantial evidence of known
areas of landslides?
LTS LTS (IS) No No No No
b) Result in substantial soil erosion or
the loss of topsoil? LTS LTS (IS) No No No No
c) Be located on a geologic unit or
soil that is unstable, or that would
become unstable as a result of the
project, and potentially result in
on-or off-site landslide, lateral
spreading, subsidence,
liquefaction or collapse?
LTS LTS (IS) No No No No
d) Be located on expansive soil, as
defined in Table 18-1-B of the
Uniform Building Code (1994),
creating substantial risks to life or
property?
LTS LTS (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
e) Have soils incapable of adequately
supporting the use of septic tanks
or alternative wastewater disposal
systems where sewers are not
available for the disposal of
wastewater?
NI NI (IS) No No No No
Discussion:
Geology and soils were addressed in the IS prepared for the GP EIR, which found that impacts to this topic would be less than significant following the implementation of the General Plan Update. According to the Safety Element of the General Plan and, as was concluded in the IS, one Alquist-Priolo earthquake fault zone along the Raymond Fault, an active strand of the Sierra Madre Fault, and a possibly active strand of the Sierra Madre Fault pass throug h the City, and the San Fernando and Whittier Fault s are located within 10.5 and
15.5 miles from the City, respectively. All active faults could experience a surface rupture in the lifetimes of development resulting from buildout of the General Plan Update. The Safety Element, California Building Code, the City’s Building and Safety Division, and the City Building Code would require all new development to comply with policies and regulations surrounding surface ruptures and would be required to conduct and submit engineering geology and soils reports prior to permit approval. Policies within the above stated regulatory setting would also enforce specific building standards related to seismic ground shaking, as the soil in the City is either sandy, stony, or gravelly loam formed on the alluvial fan adjacen t to the San Gabriel Mountains, which are soil type s characterized as loose and porous and thus susceptible to seismic ground shaking. Geotechnical investigations would be required for all new development approval as the City contains zones where liquefaction could occur near Arroyo Seco, in the San Rafael Hills, a nd near Eaton Canyon and Hastings Canyon. State and City building codes cont ain standards that new development must comply with pertaining to liquefaction as well, which the General Plan Update would be subject to. The geotechnical investigations would also need to cover the potential for landslides and building designs would be required t o comply with slope standards, as the City is susce ptible to earthquake-induced landslides originating in the San Gabriel Mountains and San Rafael Hills. The IS concluded that natural water soil erosion potential in Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
the City is low, that future construction has the possibility to expose soil to erosion, and that all construction activity would be required to practice soil erosion mitigation practices and adhere to a transport and grading control plan as required by the Los Angeles County Stormwater Program. The above-mentioned threats of landslides and liquefaction in addition to the thre at of lateral spreading and/or collapse due to the project location and quality of the soil would need to be included in each geotech nical investigation. Groundwater extraction would be monitored by the Raymond Basin Management Board to ensure the continued prevention of regional subsidence.10 Finally, each geotechnical investigation would be required to address soil expansion and each project would be required to comply with the associated standards of the Building and Safety Division and California Building Code. As the project area is urbanized, septic tanks would not be utilized during buildout of the General Plan Update. Development would include sewer lateral lines and would not rely on septic tanks or alternative wastewater disposal systems. With adherence to all regulations and policies, submission of a geotechnical report, and implementation of appropriate practices during construction, the IS concluded that buildou t of the General Plan Update would have a less than significant impact to geology and soils.
The emergency shelters, emergency shelters, limited , Low Barrier Navigation Centers, and safe parking uses as well as the carried forward Housing Element sites would apply to sites that are located within the City of Pasadena, and thus, were analyzed in the IS and are subject to similar risks and associated potential impacts related to geology and soils. Therefore, development of these uses would not cause significant impacts beyond those analyzed in the IS for the GP EIR. Additionally, future development of these uses would be required to adhere to the same regulations, policie s, and standards pertaining to geology and soils im pacts, both during construction and operation, as any new development in the City w ould, including the preparation of project-specific geotechnical investigations for individual development projects, as needed. In addi tion, the proposed change for the Reasonable Accomm odation Policy and Procedures would be procedural in nature and would not affect geology and soils.
10 City of Pasadena, Initial Study/Notice of Prepara tion, 2013.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
VIII. GREENHOUSE GAS EMISSIONS
Would the project:
a) Generate greenhouse gas
emissions, either directly or
indirectly, that may have a
significant impact on the
environment?
S-U S-U No No No No
b) Conflict with an applicable plan,
policy or regulation adopted for
the purpose of reducing the
emissions of greenhouse gases?
LTS LTS No No No No
Discussion:
The GP EIR concluded that while certain improvements under the buildout of the General Plan Update would reduce greenhouse gas (GHG) emissions per service population, the buildout would still create more GHG emissions than existing conditions and would not achieve long-term GHG reduction goals under Executi ve Order S-03-05 and target levels of AB 32; after implementing GP EIR Mitigation Measure 5-1, which required the City to prepare a community climate action plan/greenhouse gas reduction plan, the impacts related to GHG emissions would remain significant a nd unavoidable. Forecasting tools to measure future emissions from transportation, energy, waste, water/wastewater, an d other sources (e.g., landscaping equipment, light commercial equipment, and construction equipment) provided a short-term proje ction for future levels; however, these projections were found to be insufficient given the uncertainty of how the General Plan Update buildout would be phased. The GP EIR found that without implementation of a co mmunity climate action/GHG reduction plan and under current state and federal regulations, the population growth that would r esult Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
from buildout of the General Plan Update would prev ent the City from meeting AB 32 targets for emissio ns. While buildout would improve transportation by creating a live/work envi ronment, offering options for alternative and multi -modal mobility, and utilizing energy efficient design and technology, the GP EIR stated that the population growth would still create more emissions than existing conditions. The community climate action plan/green house gas reduction plan would establish community- wide targets, monitoring, and inventory reporting standards. The GP EIR concluded that it is uncertain whether buildout would create significant and unavoidable GHG related impacts without knowing the phasing of buildout or what future federal, state, and local p rograms will exist at the time.
The GP EIR found that the General Plan Update would not conflict with the CARB Scoping Plan or the SCA G’s 2012 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS).
The proposed amendments for emergency shelters and emergency shelters, limited, would amend standards and requirements for these existing land uses and allow for emergency sh elters and emergency shelters, limited, in addition al zones throughout the City.
The proposed amendment for Low Barrier Navigation Centers would allow for temporary living facilities as a land use in areas zoned for mixed uses and nonresidential zones permitting multifamily uses. The proposed amendments would allow new short-term lodging and temporary living facilities, which would result in an increased intensity of uses in some zones co mpared to existing conditions; however, the sites the proposed amendments would ap ply to would account for a small percentage of site s analyzed under the GP EIR. Additionally, the carried forward Housing Elem ent sites were previously analyzed under the GP EIR . Any new development pursuant to the proposed amendments would be subject to the policies of the City’s current Climate Action Plan, which was adopted in 2018 to fulfill the requirements under GP EIR Mitigation Measure 5-1, as well as any additional climate action/GHG reduction plans established locally, state-wide, or federally at th e time. Additionally, it is not anticipated that sa fe parking uses would result in GHG emissions as the sites for safe parking uses would be located in existing parking lots with restroom facilities and exterior lighting, and would not require construction or operational uses that would result in new GHG emissions. Furthermore, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in GHG emissions.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
The overall purpose of the proposed project is to serve the needs of the unhoused community through amending the requirements for emergency shelters and emergency shelters, limited, and providing new land use categories for Low Barr ier Navigation Centers by- right and Safe Parking locations with a Minor Conditional Use Permit; to improve zoning-related procedures for people with disabilities seeking housing; and to exempt sites identified in previous Housing Elements that were carried forward to the current Housing Element’s Sites Inventory from discretionary design review. The proposed amendments to the PMC would help achieve the goals and vision of the General Plan by providing more inclusive standards and requirements to serve the community’s housing needs such that the City of Pasadena can be an equitable, safe, accessible place for all its residents. The proposed amendments are not intended to result in direct or indirect reductions in GHG emissions. Nonetheless, similar to the impacts addressed in the GP EIR, it is likely that impacts related to GHG emissions from the buildout of the sites associated with the proposed amendment s would be less than significant for each individual project (and will b e analyzed on a project-by-project basis), but that the magnitude of future buildout could result in a substantial increase in GHG emissions within the City that is significant and unavoidable.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur, nor would the significant unav oidable impacts identified in the GP EIR be worsene d. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not pro pose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the Emergency
Shelter and
Other Code
Amendments?
IX. HAZARDS AND HAZARDOUS MATERIALS
Would the project:
a) Create a significant hazard to the
public or the environment through
the routine transport, use, or
disposal of hazardous materials?
LTS LTS No No No No
b) Create a significant hazard to the
public or the environment through
reasonably foreseeable upset and
accident conditions involving the
release of hazardous materials
into the environment?
LTS LTS No No No No
c) Emit hazardous emissions or
handle hazardous or acutely
hazardous materials, substances,
or waste within one-quarter mile of
an existing or proposed school?
LTS LTS No No No No
d) Be located on a site that is
included on a list of hazardous
materials sites compiled pursuant
to Government Code Section
65962.5 and, as a result, would it
create a significant hazard to the
public or the environment?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the Emergency
Shelter and
Other Code
Amendments?
e) For a project located within an
airport land use plan or, where
such a plan has not been adopted,
within two miles of a public airport
or public use airport, would the
project result in a safety hazard for
people residing or working in the
project area?
NI NI (IS) No No No No
f) For a project within the vicinity of a
private airstrip, would the project
result in a safety hazard for people
residing or working in the project
area?
LTS LTS (IS) No No No No
g) Impair implementation of or
physically interfere with an
adopted emergency response plan
or emergency evacuation plan?
LTS LTS No No No No
h) Expose people or structures to a
significant risk of loss, injury or
death involving wildland fires,
including where wildlands are
adjacent to urbanized areas or
where residences are intermixed
with wildlands?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the Emergency
Shelter and
Other Code
Amendments?
Discussion:
The GP EIR found that buildout in accordance with t he General Plan Update would involve the transport, use, and/or disposal of hazardous materials; however, impacts would be less than significant as construction would be short-te rm and in compliance with all California Health and Safety Code, Occupational Saf ety and Health Administration (OSHA), and SCAQMD re gulations; project operations would reduce industrial uses compared to existing conditions and all new development would comply with the City’s Safety Element. The GP EIR found that 844 hazardous materi al sites fall within the City or within a 0.25-mile radius thereof; however, compliance with the Comprehensive Environmental Response, Compensation and Liability Act, Resource Conservation and Recovery Act, California Code of Regulations, Title 22, and related requirements, as well as adherence to the City’s Land Use Element Policy LU
3.5 Hazardous Uses would bring the impact level to less than significant. The GP EIR concluded that project development could affect the implementation of an emergency response or evacuation plan due to population growth, development intensity, and road closures during construction; however, coordination with the Pasadena Fire Department (PFD) and compliance with the Los Angeles County Operational Area Emergency Response Plan and the City’s Emergency Operation Plan would ensure each project and buildout of the General Plan Update has a less than significant imp act related to this topic. Finally, the GP EIR foun d that areas of the city near very high fire hazard severity zones could expose struct ures and/or residences to fire hazards during build out of the General Plan Update.
However, compliance with the International Fire Cod e, California Fire Code, and the City’s Safety Elem ent would ensure that future development under the General Plan Update would not expose people or structures to substantial wildfire hazards, and impacts would be less than significant. The IS prepared for the G P EIR found that no portion of the City is located within an airport land use plan or within two miles of an airport, and no related impa ct would occur. Furthermore, the IS prepared for th e GP EIR concluded that the General Plan Update would not allow development of buildings with increased height that affect flight patterns or pose a safety hazard, and any related impacts would be less than significant.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the Emergency
Shelter and
Other Code
Amendments?
Similar to the buildout analyzed in the GP EIR, construction of future development of emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, or carried forward Housing Element sites could potentially involve the transport, use, and/or disposal of hazardous materials. Additionally, construction ass ociated with individual projects developed for emer gency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and carried forward Housing Element sites use would be temporary in nature, and all development would comply with the California Health and Safety Code, OSHA, and SCAQMD regulations. Sim ilar to the GP Update analyzed in the GP EIR, impacts resulting from the development of emergency shelters, emergency shelte rs, limited, Low Barrier Navigation Centers, and carried forward Housing Element sites would be less than significant as construction would be short-term and in compliance with all California Health and Safety Code, OSHA, and SCAQMD regulations. Additionally, the proposed amendments for emergency shelters, emergency shelters, limited, and carried forward Housing Element sites would not allow for development of those uses in a new zone designated for General Industria l uses, which are the land uses typically associate d with hazards and hazardous materials. The proposed amendment for Low Barrier Navigation Centers would allow for the use to be in the EPSP-d1-IG zone; however, as discussed in the GP EIR, the City has ordinances regulating hazardous materials and the General Plan contains policies and programs to ensure compliance with federal, state, and local regulations relating to hazardous waste production, use, storage, transport, or disposal of hazardous materials. The GP EIR identifies hazar dous material sites within the City, including site s that the proposed amendments would apply to; 11 however, future development would be required to c omply with the Comprehensive Environmental Response , Compensation and Liability Act, Resource Conservati on and Recovery Act, California Code of Regulations , Title 22, and related requirements, as well as adherence to the City’s Land Use Element Policy LU 3.5: Hazardous Uses, and as a result any related impacts would be less than significant.
It is not anticipated that safe parking uses would result in transport, use, and/or disposal of hazard ous materials as the sites for safe parking uses would be located in existing parking lots with restroom facilities and exterior lighting, and would not require construction or
11 City of Pasadena. 2015 General Plan EIR. Table 5. 6-3: EnviroStor Active and Inactive (Needs Evaluation) Cases in Pasadena Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the Emergency
Shelter and
Other Code
Amendments?
operational uses that would result in hazards. Furt hermore, the proposed change for the Reasonable Acc ommodation Policy and Procedures would be procedural in nature and would not result in impacts related to hazards and hazardous materials.
Future development of emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and carried forward Housing Element sites could result in temporary road closur es. Similar to the GP Update analyzed in the GP EIR , all future development implemented under the proposed amendments would be required to coordinate with the PFD. Additionally, future development implemented under the proposed amendments would not interfere with the Los Angeles County Operational Area Emergency Response Plan or the City’s Emergency Operation Plan. Furthermore, no future development project would be permitted to block any designated evacuation routes. Additionally, as discussed, it is not anticipated that safe parking uses would result in temporary closures or interfere with the County and City emergency operation plans as the sites for safe parking uses would be located in existing parking lots, and would not require construction or operational uses. Furthermore, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in impacts related to hazards and hazardous materials. Therefore, similar to the GP EIR, the proposed amendments are not expe cted to significantly affect the implementation of an emergency response or evacuation plan.
The current CEQA Guidelines Appendix G checklist al so includes assessment criteria for potential impac ts to wildfire for those areas located within or near a state responsibility area or on lands classified as Very High Fire Hazard Sev erity Zones. Some sites in the western portion of the City that are located within lands classified as Very High Fire Hazard Severity Zones would allow for safe parking uses. However, no development would occur with the proposed safe parking uses; instead, areas for safe parking would be allowed with a Minor Conditional Use Permit for temporary overni ght parking. Additionally, the safe parking program requires a monitoring and oversight program that would be operated by the Program Operator, which would allow the safe parking facility to be closed in the event of wildfire risk. Nonetheless, similar to the GP EI R, coordination with the PFD and compliance with th e City’s Safety Element, City’s Emergency Operation Plan, and the Los Angeles County Operational Area Emergency Response Plan would ensure that implementation Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the Emergency
Shelter and
Other Code
Amendments?
of the proposed amendments would not expose people or structures to substantial wildfire hazards, and impacts would be less than significant.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new info rmation of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
X. HYDROLOGY AND WATER QUALITY
Would the project:
a) Violate any water quality
standards or waste discharge
requirements?
LTS LTS No No No No
b) Substantially deplete groundwater
supplies or interfere substantially
with groundwater recharge such
that there would be a net deficit in
aquifer volume or a lowering of the
local groundwater table level (e.g.,
the production rate of pre-existing
nearby wells would drop to a level
which would not support existing
land uses or planned uses for
which permits have been
granted)?
LTS LTS No No No No
c) Substantially alter the existing
drainage pattern of the site or
area, including through the
alteration of the course of stream
or river, in a manner, which would
result in substantial erosion or
siltation on- or off-site?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
d) Substantially alter the existing
drainage pattern of the site or
area, including through the
alteration of the course of stream
or river, substantially increase the
rate or amount of surface runoff in
a manner, which would result in
flooding on- or offsite?
LTS LTS No No No No
e) Create or contribute runoff water
which would exceed the capacity
of existing or planned stormwater
drainage systems or provide
substantial additional sources of
polluted runoff?
LTS LTS No No No No
f) Otherwise substantially degrade
water quality? LTS LTS No No No No
g) Place housing within a 100-year
flood hazard area as mapped on a
federal Flood Hazard Boundary or
Flood Insurance Rate Map or dam
inundation area as shown in the
City of Pasadena adopted Safety
Element of the General Plan or
other flood or inundation
delineation map?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
h) Place within a 100-year flood
hazard area structures, which
would impede or redirect flood
flows?
NI NI (IS) No No No No
i) Expose people or structures to a
significant risk of loss, injury or
death involving flooding, including
flooding as a result of the failure of
a levee or dam?
LTS LTS No No No No
j) Inundation by seiche, tsunami, or
mudflow? LTS LTS No No No No
Discussion:
The GP EIR found that buildout of the General Plan Update could increase the amount of impervious surfaces in the City of Pasadena resulting in an increase in surface water flows int o drainage systems within the watershed, potentiall y resulting in altered drainage patterns, erosion, siltation, and/or flooding. In addition, construction phases of projects developed under the General Plan Update could potentially result in short-term increases in storm water pollutant concentrations, and operation of such projects could potentially affect water quality (sediment, nutrients, metals, pesticides, pathogens, and hydrocarbons) due to water and waste discharge. However, as described in the GP EIR, the City is primarily developed and urbanized, and all development would be required to adhere to applicable local, state, and federal hydrology and water quality regulations and standards. Accordingly, the development of emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and carried forward Housing Element sites would also be required to implement site-specific design measures, low-impact development (LID), and best management practices (BMPs), including infiltration features that contribute to groundwater recharge and minimize stormwater runoff, pollution, erosion, siltation, and/or flooding. All new Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
project applicants would also be required to submit a drainage plan to the Planning and Development Department and the Public Works Department for approval prior to issuance of grading or building permits. In addition, stormwater runoff from the proposed uses would be further regulated by Chapter 4.52 of the Municip al Code, Sewer Use Fee and Storm Drain Charge, whic h requires each property that discharges to the City’s storm drain or storm drain facility to pay a fee based on the quantity o f runoff, which is used for future improvements and to maintain the existing system. A s such, similar to buildout of the General Plan Upd ate, the development of emergency shelters, emergency shelters, limited, Lo w Barrier Navigation Centers, and carried forward H ousing Element sites would result in less than significant impacts related to drainage patterns, erosion, siltation, and flooding from surface runoff. Additionally, Safe Parking uses would occur in existing developed area s (i.e., paved parking lots), and would not result in an increase in impervious surface areas, runoff, and altered drainage patterns.
As discussed in the GP EIR, as most of the General Plan Update area is already built out, future devel opment is not anticipated to result in a significant increase in impervious surf aces that could lead to substantially reduced groun dwater recharge. In addition, as previously described, all new emergency shelters, e mergency shelters, limited, Low Barrier Navigation Centers, and development of carried forward Housing Element sites would be subj ect to all applicable water quality regulations, in cluding measures to minimize stormwater runoff and infiltration features that co uld contribute to groundwater recharge. Additionall y, due to depth of groundwater within the City, none of the proposed developments would be anticipated to encounter groundwater and require dewatering. Moreover, none of the proposed developments’ operations would include the extraction of groundwater. Therefore, the development of the proposed uses would not conflict with the implementation of a water quality control plan or sustainable groundwater management plan, and groundwater impacts would be less than significant.
The GP EIR stated that buildout of the General Plan Update would not place any housing within the Devil’s Gate Dam inundation zone, but the East Pasadena Specific Plan area and some areas designated Low Density Residential are located within the Eaton Wash dam inundation zone. As such, emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, carried forward Housing Element sites, and safe parking uses could potentially be located within the Eaton Wash dam inundation zone . However, the GP EIR Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
states that the probability that there would be sig nificant water behind the dam coinciding with a dam breach is extremely low.
Furthermore, dams are continually monitored by vari ous governmental agencies (i.e., California Divisio n of Safety of Dams and the U.S. Army Corps of Engineers), and dam owners are r equired to maintain Emergency Action Plans that include emergency warnings and procedures for damage assessment. Additionally, the City of Pasadena addresses the possibility of dam failure in the Safety Element of the General Plan and in the Hazard Mitigation Plan. Therefore, emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, carried forward Housing Element sites, and safe parking uses would not expose people or structures to a significant risk of loss, injury, or death in the case of dam failure, and development of these uses would not cause significant impacts beyond those analyzed in the GP EIR.
As discussed in the GP EIR, the very northernmost portions of the City, above Devil’s Gate Reservoir and Eaton Wash Reservoir, are mapped as areas of mud and debris flow. However, su ch mudflow areas are in designated open space to wh ich the project has no changes. As such, emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, carried forward Housing Element sites, and safe parking uses would not be located within these susceptible areas, and mudflow impacts would be less than significant.
With regard to floodplains, the IS prepared for the GP EIR found that no portions of the City are loca ted within a 100-year floodplain; therefore, no impact related to floodplains would occur. The City is also located more than 20 miles from the Pacific Ocean and is well outside of the tsunami inundation zone. In addition , due to the typically low reservoir levels of the Devil’s Gate Reservoir and Eaton Wash Reservoir, there would not be any significant impacts due to an earthquake-induced seiche.
Lastly, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not affect hydrology and water quality.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
New Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
XI. LAND USE AND PLANNING
Would the project:
a) Physically divide an established
community? LTS LTS (IS) No No No No
b) Conflict with any applicable land
use plan, policy, or regulation of
an agency with jurisdiction over
the project (including, but not
limited to the general plan,
specific plan, or zoning ordinance)
adopted for the purpose of
avoiding or mitigating an
environmental effect?
LTS LTS No No No No
c) Conflict with any applicable
habitat conservation plan (HCP)
or natural community
conservation plan (NCCP)?
NI NI (IS) No No No No
Discussion:
The IS prepared for the GP EIR found that land use changes proposed within the specific plan areas are intended to tie into the existing uses and surrounding neighborhoods. As such, it was concluded that the General Plan Update would not physically divide an existing community and the impact would be less than signifi cant. Under the project, zones that permit emergenc y shelters (with a Minor Conditional Use Permit) would be expanded from several zones within the Central District Specific Plan, East Colorado Specific Plan, Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
and East Pasadena Specific Plan areas to include se veral zones within the South Fair Oaks Specific Pla n, Lincoln Avenue Specific Plan, Fair Oaks/Orange Grove Specific Plan, and North Lake Specific Plan areas as well as commercial office (CO) and commercial limited (CL, CL-2) districts. Zones that permit eme rgency shelters, limited, by-right would be expande d to overlap with several emergency shelter-permitted zones and as well as several zones of the Lincoln Avenue Specific Plan and the Fair Oaks/Orange Grove Specific Plan areas. As Low Barrier Navigation Centers are currently permitted by-right per Government Code Section 65660 in areas zoned for mixed uses and nonresidential zones permi tting multifamily uses, the project would formalize the use of Low Barrier Navigation Centers in the City Zoning Code within t hese zones permitting multifamily development in th e specific plan areas. The newly proposed safe parking uses would only be allo wed with a Minor Conditional Use Permit at Religiou s Facilities sites and sites occupied by Public and Semi-Public. Furthermore, th e project would establish operational requirements and/or buffer areas for proposed emergency shelter, emergency shelter, limi ted, Low Barrier Navigation Centers, and safe parki ng land uses from existing emergency shelters, emergency shelters, limited, Lo w Barrier Navigation Centers, and residential zonin g district boundaries. As described in the GP EIR, the City is almost entirely built out, and future development of the General Plan Update would be mostly infill.
Similarly, development of the proposed land uses would also occur within existing urban areas and predominately infill sites. Therefore, the proposed land uses would not physically divide an established community. In addition, as indicated in the IS prepared for the GP, there are no adopted habitat conservation or natura l community conservation plans within the City. The refore, the proposed uses would not result in impacts to such plans.
The GP EIR compared the General Plan Update’s proposed land use changes—including proposed net increases in development and new policies pertaining to building intensity and u rban design—to existing land uses in the City and c oncluded that possible direct impacts to land use and planning would be less than significant. As found by the GP EIR and in accordance with California Government Code Section 65302, the General Plan Update would a ddress two of the seven required Elements: Land Use and Mobility. The GP EIR also found that the General Plan Update would b e consistent with the SCAG RTP/SCS, as is required. It was concluded that implementation of the General Plan Update could result in a net increase of 12,312 additional residential dwelling units and 10,988,959 Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
square feet of nonresidential uses; this net increase would be framed and regulated by the goals and policies of the City’s Land Use and Mobility Elements, which accommodate growth through 2035. The GP EIR stated that in addition to the goals and policies of the Land Use and Mobility Elements, all new development would also be required to comply with Title 17 of the City’s Municipal Code and applicable design guidelines. As such, the GP EIR f ound that the proposed updates would not conflict w ith any existing applicable policies or regulations and would be implemented in such a way that creates compatibility within the p lan area; impacts to land use and planning were determined to be less than significant in the GP EIR.
As described in the GP EIR, the Land Use Element in cludes a goal to have a mix of land uses that meets the diverse needs of Pasadena’s residents and businesses, fostering impr oved housing conditions, offering a variety of empl oyment and recreation opportunities, and supporting a healthy population while protecting the environment. Policy Land Use 2 .1 refers to the provision of opportunities for a full range of housing types, de nsities, locations, and affordability levels to add ress the community’s fair share of regional, senior, and workforce housing needs, whil e the types, densities, and location of housing sha ll be determined by the Land Use Diagram and reflect the projected needs specified in the Housing Element. The purpose of the proposed project is to provide more inclusive standards and requirements to serve the City of Pasadena’s housing needs, thereby implementing elements of the City’s 6 th Cycle Housing Element and bringing the City’s Zoning Ordinance into compliance with State law. As described in the City’s 2021-2029 Housing Element, the COVID ‐19 pandemic and resulting economic shutdown exacerb ated the pre-pandemic housing challenges related to rising costs, equal access, and quality. The proposed amendments would help achieve the goals and vision of the General Plan through amending the requirements for emergenc y shelters and emergency shelters, limited, and pro viding new land use categories for Low Barrier Navigation Centers (by-r ight) and Safe Parking (with Minor Conditional Use Permits) to avoid further displacement of the unhoused community and provide supportive services and assistance for clients’ transitions to permanent housing.
Furthermore, the proposed project would also improv e zoning-related procedures for people with disabil ities seeking housing and exempt previously identified sites in Housing Elements from discretionary design review. With the project’s zoning code amendments, the City would be better equipped to respond to com munities in need, efficiently permit land uses to s upport them, and streamline Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
procedural processes. Further, it should be noted that the proposed zone code amendments do not specifically identify any emergency shelter, emergency shelter, limited, Low Barrier Na vigation Center, or safe parking land use developme nt projects. Rather, future development projects would implement the land use s tandards and requirements proposed by the project w ithin the proposed zone code amendments, and overall impacts related to consistency with land use plans and policies would be less than significant.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
XII. MINERAL RESOURCES
Would the project:
a) Result in the loss of availability of
a known mineral resource that
would be of value to the region
and the residents of the state?
NI NI (IS) No No No No
b) Result in the loss of availability of
a locally-important mineral
resource recovery site delineated
on a local general plan, specific
plan or other land use plan?
NI NI (IS) No No No No
Discussion:
Mineral resources were addressed in the IS prepared for the GP EIR, which found that impacts in this topic would be less than significant following the implementation of the General Plan Update. The IS states that there is no active mining in the City. Based on the California Geological Survey and as stated in the IS, the Eato n Wash and Arroyo Seco Wash are classified as Miner al Resource Sectors and may contain mineral resources within the City, but neither contain active mines or reserves, and buildout of the General Plan Update would not result in development in either area. Additionally, there are no mineral resource recovery sites in the City. The IS concluded that there would be no impact to mineral resources following implementation of the General Plan Update. 12 As the emergency shelters,
emergency shelters, limited, Low Barrier Navigation Centers, and safe parking uses would occur within the same boundaries as those analyzed in the GP EIR and would not be located wit hin any of the identified Mineral Resource Sectors, the uses would not contain
12 City of Pasadena, Initial Study/Notice of Prepara tion, 2013.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
mineral resources or develop on Mineral Resource Se ctors. In addition, the proposed change for the Rea sonable Accommodation Policy and Procedures would be procedural in nature and would not affect mineral resources.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
XIII. NOISE
Would the project result in:
a) Exposure of persons to or
generation of noise levels in
excess of standards established in
the local general plan or noise
ordinance, or applicable standards
of other agencies?
LTS LTS No No No No
b) Exposure of persons to or
generation of excessive
groundborne vibration or
groundborne noise levels?
S-U S-U No No No No
c) A substantial permanent increase
in ambient noise levels in the
project vicinity above levels
existing without the project?
LTS LTS No No No No
d) A substantial temporary or
periodic increase in ambient noise
levels in the project vicinity above
levels existing without the project?
S-U S-U No No No No
e) For a project located within an
airport land use plan or, where
such a plan has not been adopted,
within two miles of a public airport
NI NI (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
or public use airport, would the
project expose people residing or
working in the project area to
excessive noise levels?
f) For a project within the vicinity of a
private airstrip, would the project
expose people residing or working
in the project area to excessive
noise levels?
LTS LTS (IS) No No No No
Discussion:
The GP EIR analyzed impacts to noise from construct ion and operation of buildout of the General Plan U pdate, including stationary noise, traffic noise, rail noise, industrial noise, and all affiliated levels of vibration. The GP EIR assessed the updates for compatibility with the City’s Land Use and Noise Elements. The GP EIR concluded that increased stationary and traffic noises from buildout would have a less than significant impact; if residential and sensitive land uses continue to be developed in compatible areas, and those uses that are compatible with transportation noises are developed in compliance with the Noise and Land Use Elements, as well as other state and local regulations pertaining to noise, then this impact would be less than significant as well. Regarding exposure to long-term groundborne vibration, the GP EIR found that both rail and industrial uses could cause a potentially significant impact. Portions of the City are designated for and operate as industrial u ses. GP EIR Mitigation Measure 9-1 requires all ind ustrial projects to submit a vibration study providing evidence that vibration-causing activity would not exceed levels set forth by the Federal Transit Administration (FTA). The City of Pasadena is served by the Metro L (Gold) Line. The portion of this line in the City runs north-south parallel to Arroyo Parkway and then turns to an east-west orientation along I-210, with its current terminus in the City of Azusa. GP EIR Mitigation Measure 9-2 requires all new development within screening distance of the L (Gold) Line to submit a study conducted by an acoustical engineer to the City’s Planning Division that demonstrates v ibration impacts and possible reduction measures. I mplementation of GP EIR Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Mitigation Measures 9-1 and 9-2 would reduce ground borne vibration impacts to a less than significant level. The GP EIR concluded that short-term impacts from construction vibration would be significant and unavoidable for buildout of the General Plan Update; GP EIR Mitigation Measure 9-3 would reduce impacts to sensitive receptors within 25 feet of activity by substituting less intensive equipment when possible and utilizing vibration reduction techniques; however, because each new development involved in the buildout is project- specific, the GP EIR determined it is not possible to mitigate this impact below a significant and unavoidable level. GP EIR Mitigation Measure 9-4 further addresses vibrations from construction on sensitive architectural structures within 25 feet of activity; yet, similar to construction vibration impacts to sensitive receptors, this impact would remain significant and unavoidable in the context of total buildout as each project would present individual circumstances. GP EIR Mitigation Measure 9-5 requires all construction permits be issued only after submission of a plan for noise and vibration reducing BMPs for all development within 500 feet of a noise-sensitive receptor; still, the GP EIR concluded that this mitigation measure would not reduce the impacts of construction activities to a less than significant level as the phasing, location, and magnitude of future d evelopment under buildout is unknown. Therefore, th e GP EIR concluded that construction related noise impacts are significant and unavoidable. The IS prepared for the GP EIR found that no portion of the City is located within an airport land use plan or within t wo miles of an airport, and no impact would occur. Furthermore, the IS prepared for the GP EIR concluded that noise from helicopter fli ghts would be periodic and, thus, the impact result ing from noise from private use heliports would be less than significant.
While safe parking uses would not require any construction, buildout of emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and carried forward Housing Ele ment sites could have potentially significant noise impacts due to construction- related noise and vibration, as the phasing and spe cific sites of future developments are currently un known. However, similar to the updates analyzed under the GP EIR, such development s would implement GP EIR Mitigation Measures 9-3 th rough 9-5 to ensure activity within the vicinity of sensitive land uses, receptors, and architectural structures is compliant with FTA criteria and that BMPs are utilized throughout the construction phase of each future development project. As existing and newly p ermitted zones for emergency shelters, Low Barrier Navigation Centers, and safe parking uses would potentially include those along or near the Metro Gold (L) Line such as the Central District Specific Plan, South F air Oaks Specific Plan, East Colorado Specific Plan, East Pasadena Specific Plan, Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance That
Was Not and
Could Not Have
Been Known at
the Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
and North Lake Specific Plan, and, thus, sensitive uses could potentially be exposed to strong levels of long-term groundborne vibration from train operations. As such, the proposed develo pments within these zones would implement GP EIR Mi tigation Measure 9-2 to assess vibration impacts from rail use and implemen t reduction measures. As indicated in the IS prepar ed for the GP, there are no airports within two miles of the City. Therefore, the proposed emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites would not result in noise impacts related to an airport land use plan or public airport. Furthermore, similar to the General Plan Update, helicopter flights within zones proposed for potential emergency shelters, low barrier navigation centers, safe park ing uses, and carried forward Housing Element sites would be periodic; as such, developments would have no effect on helicopter usage or flight patterns and would cause no new helicopter noise impacts. In addition, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in noise and vibration impacts.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur, nor would the significant unav oidable impacts identified in the GP EIR be worsene d. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not pro pose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
XIV. POPULATION AND HOUSING
Would the project:
a) Induce substantial unplanned
population growth in an area,
either directly (for example, by
proposing new homes and
businesses) or indirectly (for
example, through extension of
roads or other infrastructure)?
LTS LTS No No No No
b) Displace substantial numbers of
existing housing, necessitating
the construction of replacement
housing elsewhere?
LTS LTS (IS) No No No No
c) Displace substantial numbers of
people, necessitating the
construction of replacement
housing elsewhere?
LTS LTS (IS) No No No No
Discussion:
The GP EIR concluded that while population, housing, and employment growth induced by buildout of the General Plan update would likely surpass SCAG’s forecast, the impact of buildout would be less than significant. The General Plan Update accommodates growth in all sectors; it permits new housing opportunities, and it opens more opportunities for employment. The GP EIR found that the City- wide utilities and infrastructure required to service the projected buildout population would be sufficient, and each service is discussed in more detail within its individual section of thi s document (i.e., Hydrology and Water Quality, Public Services, Trans portation and Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Traffic, Utilities and Service Systems). One of the central objectives of the General Plan Update is t o create a housing/job balance within a more work/live environment; the GP EIR found that buildout would achieve this goal, which would offset the detrimental impacts that growth would have. The IS prepared for the GP EIR found that the General Plan Update would increase the number of dwelling units by allowing higher intensity residential uses and mixed-use development and that growth in accor dance with the proposed General Plan Update was not expected to displace existing housing or people, as the General Plan Update would increase the number of dwelling units by allowing higher intensity residential uses and mixed-use development. Therefore, the IS concluded that the impacts related to displacement of housing and people would be less than significant.
As previously discussed, the emergency shelters, emergency shelters, limited, and Low Barrier Navigation Centers would be meant for temporary use by clients and, for Low Barrier Navigation Centers, for allowed individuals and/or pets with stays up to 12 continuous months. The uses would not be considered new homes that would be occupied by permanent residents, and clients of the uses would likely be unhoused persons from the local vicinity. Moreover, for safe parking uses, preference would be given to those with proof of residency in Pasadena and/or adjacent cities within the last two years, for a minimum period of six mo nths. Based on the temporary nature of the uses and clients, the emergency shelt ers, emergency shelters, limited, and Low Barrier N avigation Centers, and safe parking uses would not induce substantial unplanned population growth in the City.
Under the project, zones that permit emergency shel ters (with a Minor Conditional Use Permit) would be expanded to now include specific zones within the South Fair Oaks Specific Plan, Lincoln Avenue Specific Plan, Fair Oaks/Orang e Grove Specific Plan, and North Lake Specific Plan areas as well as commercial office (CO) and commercial limited (CL, CL-2) districts; and zones that permit emergency shelters, limited, by-right would be expanded to include specific zones in the Central District Specific Plan, East Colorado Specific Plan, Lincoln Avenue Specific Plan, and the Fair Oaks/Orange Grove Specific Plan areas. The newly proposed Low Barrier Navigation Centers would be permitted in all zones permitting mixed-use development and commercial zones permitting multifamily development, subject to operational requirements. T he newly proposed safe parking uses would only be a llowed with a Minor Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Conditional Use Permit at Religious Facilities sites and sites occupied by Public and Semi-Public use. Since the phasing and specific sites of future developments are currently unknown, it is theoretically possible that emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites could dis place existing housing and persons. However, the purpose of the project is to provide more inclusive standards and requirements t o serve the City’s housing needs, thereby implementing elements of the City’s 6 th Cycle Housing Element (2021-2029) and bringing the City’s Zoning Ordinance into compliance with State law. As described in the City’s 2021-2029 Housing Element, the COVID ‐19 pandemic and resulting economic shutdown exacerbated the pre-pandemic housing challenges related to rising costs, equal access, and quality. As such, the City is also undertaking the project in order to avoid further displacement of the unhoused community and instead provide supportive services and assistance for clients’ transition to permanent housing. Therefore, similar to the GP EIR, the project’s emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and safe parking uses would not displace substantial numbers of existing housing or people. In addition, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in population or housing impacts.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
XV. PUBLIC SERVICES
Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
a) Fire protection? LTS LTS No No No No
b) Police Protection? LTS LTS No No No No
c) Schools? LTS LTS No No No No
d) Libraries? LTS LTS No No No No
Discussion:
The General Plan Update area is within the City of Pasadena and is serviced by the PFD, Pasadena Polic e Department (PPD), Pasadena Unified School District, and the Pasadena Public Library (PPL). The PFD operates eight stations throughout the City, with an average daily staff of 51. The GP EIR found that, while population growth and increased infrastructure from buildout of the General Plan Update would result in higher demand for service from the PFD and possibly require new or expanded facilities, compliance with existing regulations and coordination during road c losures related to future construction would ensure impacts remain less than significant. The PPD aims to employ 1.63 officers p er capita and 0.72 officers per 1,000 residents. Th e GP EIR found that, while population growth and increased infrastructure from buildout of the General Plan Update would result i n higher demand for service from the PPD and possibly require new or expanded facilities, compliance with existing regulations would ensure impacts remain less than significant. The GP EIR concluded that while p opulation growth from buildout of the General Plan Update would create new students in the population, it is unlikely that forecasted growth would exceed the capacity of existing facilities; additionally, per SB 50, all new development in the City is subject to a Sch ool Impact Fee to ensure that school services conti nue to meet the needs of the Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
population. The PPL operates 10 facilities, all within 1 mile or walking distance of each residence. The GP EIR found that while buildout of the General Plan update would induce population growth, the estimated growth would not exceed the PPL’s capacity to serve the community; additionally, all new development is subject to fees and taxes that fund public services, including a Library Special Tax, to ensure continued funding for the PPL. The GP EIR concluded that all impacts to public services would be less than significant.
Since the phasing and specific sites of future developments are currently unknown, the volume of clients who would be served by the proposed uses and who would add to such demands are also undetermined. Program operators of emergency shelters, emergency shelters, limited, and Low Barrier Navigation Centers would be required to have a written management plan that would entail security provisions, screening of clients to ensure compatibility with proposed services provided, and other requirements. Program operators of safe parking uses would also include a monitoring and oversight program, neighborhood relations plan, and would not permit illegal drugs, alcohol, and fires on its sites. All such pl ans would also be subject to the review and approva l by the Zoning Administrator.
Furthermore, the City would continue to fund police and fire protection services through the general f und. Each emergency shelter, emergency shelter, limited, Low Barrier Navigation Center, safe parking use, carried forward Housing Element sites would be required to comply with existing regulations related to safety, design, and development fees and taxes, as applicable, which would contribute to the provision of public services within the City. In addition, as discussed above, clients of the emergency shelter, emergency shelter, limited, Low Barrier Navigation Center, and safe pa rking uses would likely be unhoused persons from th e local vicinity who will transition to permanent housing. As such, the clients and/or their partners, families, and dependents of such proposed uses would not represent a newly generated population that would substantially add to the demand for schools and libraries. Therefore, the emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and safe parking uses would not be anticipated to increase demand for public services beyond the level analyzed in the GP EIR, which was determined to have less than significant impacts. In addition, the proposed changes for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in impacts related to public services.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project would not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
XVI. RECREATION
Would the project:
a) Would the project result in a
substantial adverse physical
impact associated with the
provisions of new or physically
altered governmental facilities,
need for new or physically altered
governmental facilities, the
construction of which could cause
significant environmental impacts,
in order to maintain acceptable
service ratios, response times or
other performance objectives for
parks?
LTS LTS No No No No
b) Would the project increase the
use of existing neighborhood and
regional parks or other
recreational facilities such that
substantial physical deterioration
of the facility would occur or be
accelerated?
LTS LTS No No No No
c) Does the project include
recreational facilities or require LTS LTS No No No No Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
the construction or expansion of
recreational facilities, which might
have an adverse physical effect
on the environment?
Discussion:
The City’s Municipal Code does not dictate a resident/acreage ratio for parkland and open space. While buildout of the General Plan Update would induce population growth and likely in crease demand for parkland and open space and poten tially result in the deterioration of existing facilities, the GP EIR found that improvements to existing and development of new open space and recreation amenities included in buildout, in conjunction with the Residential Impact Fee that each new development would be subject to as well as other in-lieu fees, impacts would be less than significant. The GP EIR concluded that the increase in population projected by buildout of the General Plan Update would increase demand fo r parkland, open space, and recreational facilities ; increased use could deteriorate existing facilities or require the development of additional facilities. The GP EIR found that land uses permitting parkland, open space, and recreational activities would not be converted and that there would be opportunities for additional facilities to be built.
All residential development under the buildout of the GP Update would be required to pay a Residential Impact Fee; any type of project that acquires open space would also be subject to i n-lieu fees. As such, the GP EIR found that impacts to recreation would be less than significant with adherence to existing regulations, including payment of applicable fees.
Since the phasing and specific sites of future developments are currently unknown, the volume of clients who would be served by the proposed uses and who would add to such demand is u ndetermined. However, as previously described, emer gency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and safe parking uses would not be considered residential developments that would be occupied by permanent residents and w ould not be required to pay Residential Impact Fees . In addition, these uses would not be required to provide open space and rec reational facilities on its sites, and the clients of the proposed uses would likely Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
be unhoused persons from the local vicinity. As suc h, the clients and/or their partners, families, and dependents of such proposed uses would not represent a newly generated population that would substantially add to the demand for parks and recreational facilities.
Also, the development of emergency shelters, emerge ncy shelters, limited, Low Barrier Navigation Cente rs, and safe parking uses would not preclude the City from improving or developing parkland, open space, and recreational facilities as outlined in the goals and policies of the General Plan Update. In addition, a s the carried forward Housing Element Sites would o ccur within areas designated by the GP allowing multifamily uses, buildout of these sites have already been considered in the GP EIR. Lastly, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not res ult in impacts related to parks and recreation.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
XVII. TRANSPORTATION/TRAFFIC
Would the project:
a) Conflict with an applicable plan,
ordinance or policy establishing
measures of effectiveness for the
performance of the circulation
system, taking into account all
modes of transportation including
mass transit and non-motorized
travel and relevant components of
the circulation system, including
but not limited to intersections,
streets, highways and freeways,
pedestrian and bicycle paths, and
mass transit?
LTS-M(GP) LTS-M No No No No
b) Conflict with an applicable
congestion management
program, including, but not limited
to level of service standards and
travel demand measures, or other
standards established by the
county congestion management
agency for designated roads or
highways?
LTS S-U No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
c) Result in a change in air traffic
patterns, including either an
increase in traffic levels or a
change in location that results in
substantial safety risks?
NI NI (IS) No No No No
d) Substantially increase hazards
due to a design feature (e.g.,
sharp curves or dangerous
intersections) or incompatible
uses (e.g., farm equipment)?
LTS LTS No No No No
e) Result in inadequate emergency
access? LTS LTS No No No No
f) Conflict with adopted policies,
plans, or programs regarding
public transit, bicycle, or
pedestrian facilities, or otherwise
decrease the performance or
safety of such facilities?
LTS-M(GP) LTS-M No No No No
Discussion:
The GP EIR analyzed the General Plan Updates for impacts to traffic and transportation based on calculations for vehicle miles traveled (VMT) per capita, vehicle trips (VT) per capita, proximity and quality of bicycle networks, proximity and quality of transit networks, and pedestrian accessibility, as well as compatibility with the City’s Mobility Element. The GP EIR conclu ded that implementation of the Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
General Plan Update would not conflict with the Cit y’s plans, ordinances, or policies establishing mea sures of effectiveness for the performance of the complete circulation system, and would comply with adopted policies, plans, and pro grams for alternative transportation. It found that transportation performance would improve, and pedestrian and bicycle accessibility would increase from buildout of the General Plan Update, which would sa tisfy Mobility Plan goals around livability, non-mo torized transit, and economic viability. The GP EIR stated that all improvements within the City are funded through the City’s trans portation fee program with the exception of bicycle and pedestrian improvements. T he proposed General Plan Update included Policy 2.1 0, requiring the City to amend the existing transportation impact fee to include pedestrian and bicycle improvements. The GP EIR concluded that without full funding of circulation improvements, the General Plan Update would result in a significant impact. As such, GP EIR Mitigation Measure 13-1 was identified in the GP EIR, which required the City to update the transportation impact fee program in place at the time the GP EIR was prepared by 2020 to ensure that impacts to traffic and transportation resulting from buildout of the General Plan Update remain less than significant. The City implemented GP EIR Mitigation Measure 13-1 and updated the tran sportation impact fee program, as mandated by AB 1600 legislation, as codified by California Code Government Section 66000 et seq.
The GP EIR found that buildout traffic conditions w ould result in designated road and/or highways exce eding county congestion management program thresholds, resulting in a signi ficant project impact at the intersection of Pasade na Avenue at California Boulevard during the AM peak hour; impacts at all other intersections under Metro’s Congestion Management Program (CMP) would be less than significant. The GP EIR also identified significant impacts at two CMP Freeway Mainline Segments on Interstate 210. The GP EIR concluded that there was no feasible mitigat ion to reduce CMP impacts to a less than significan t level, as improvements to road capacity would require changes to road infrastructure, which would have secondary impacts such as loss of bicycle lanes, parking, sidewalk space, etc., that would conflict with Gene ral Plan goals and policies and would cause other i mpacts to traffic and transportation. As such, this impact was determined to be significant and unavoidable.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
Finally, the GP EIR found that under buildout, project circulation improvements would be designed to adequately address potentially hazardous conditions (e.g., sharp curves, etc.), po tential conflicting uses, and emergency access. The IS prepared for the GP EIR found that no portion of the City is located within an airport land use plan or within two miles of an airport. As such, the General Plan Update would not affect air traffic patterns, and no impact would occur.
The project would not include modifications to roadways and infrastructure but would potentially contribute to circulation improvements by improving proximity to public transportation and places of retail and employment. The emergency she lters, emergency shelters, limited, Low Barrier Navigation Centers, and carried forward Housing Element sites would also be subject to whatever transportation impact fee is in effect at the time of permitting, per GP EIR Mitigation Measure 13-1, which would ens ure circulation improvements continue. The safe parking uses would be located on specific sites with allowed vehicles to remain parked off-street and would not be anticipated to affect circulation. As such, impacts from emergency shelters, emergency shelters, limit ed, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites related to proximity and quality of bicycle networks, proximity and quality of transit networks, and pedestrian accessibility would be less than significant. In addition, emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and safe parking uses would be required to adhere to the proposed standards and operational requirements according to the proposed zone code amendments and would not be considered in compatible uses.
Furthermore, proper design and City review and approval of such projects would avoid substantially increased hazards or inadequate emergency access. Since the publication of the GP EIR, the Los Angeles County CMP has been dissolved. Additionally, as indicated in the IS prepared for the GP EIR, there are no airports within two miles of the City. Therefore, emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, safe parki ng uses, and carried forward Housing Element sites would not affect air traffic patterns, and no impact would occur.
The current CEQA Guidelines Appendix G checklist al so recommends considering a project’s potential to conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b), which requires the use of VMT as the updated measurement of traffic im pacts, Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
replacing the level of service (LOS) method previously used. As discussed, the GP EIR included a City-wide VMT analysis for impacts to traffic and transportation based on calculations for VMT per capita and VT per capita. The analysis used the City of Pasadena Travel Demand Forecasting Model, which was validated to 2013 traffic conditions and later updated to reflect 2017 conditions. Both the 2013 and 2017 models assumed that the I-710 extension wo uld be constructed by 2035, which is no longer a va lid assumption. As such, an assessment was conducted to update the model to reflect the 2035 horizon year without the I-710 ext ension. 13 This assessment concluded that there were no substantial deviations from the VMT and VT analyses with the removal of t he I-710 from the model.
Thus, both versions of the Pasadena Travel Demand F orecasting Model are consistent with the changes to the CEQA metrics establishing VMT as the measurement of traffic impa cts. The VMT analysis previously prepared for the G P EIR would also be applicable to the proposed uses. Further, it should be noted that there is no specific development pro ject identified by the proposed zone code amendments. Rather, future development projects would implement the land use standards and requirements proposed in the proposed zone code amendments. As emergency she lters, emergency shelters, limited, or Low Barrier Navigation Centers, and safe parking uses would be meant for temporary use by clients, these uses would not provide permanent dwelling onsite and would instead support those transitioning into permanent housing. Such future non-residential development pr ojects that are greater than 50,000 square feet in size would be required to inc lude a VMT assessment as part the environmental doc umentation prepared for a specific project. As such, the proposed zone code a mendments related to emergency shelters, emergency shelter, limited, Low Barrier Navigation Center, and safe parking uses would not conflict or be inconsistent with CEQA Guidelines Section 15064.3(b), and impacts would be less than significant.
Lastly, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in impacts related to transportation/traffic.
13 Pasadena Future Year Travel Demand Forecasting Mo del Update and New VMT/VT Metrics Memorandum, Fehr & Peers, October 2020.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur, nor would the significant unav oidable impacts identified in the GP EIR be worsene d. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not pro pose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
XVIII. UTILITIES AND SERVICE SYSTEMS
Would the project:
a) Exceed wastewater treatment
requirements of the applicable
Regional Water Quality Control
Board?
LTS LTS No No No No
b) Require or result in the
construction of new water or
wastewater treatment facilities or
expansion of existing facilities, the
construction of which could cause
significant environmental effects?
LTS LTS No No No No
c) Require or result in the
construction of new storm water
drainage facilities or expansion of
existing facilities, the construction
of which could cause significant
environmental effects?
LTS LTS No No No No
d) Have sufficient water supplies
available to serve the project from
existing entitlements and
resources, or are new or
expanded entitlements needed?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
e) Result in a determination by the
wastewater treatment provider,
which serves or may serve the
project that it has adequate
capacity to serve the project’s
projected demand in addition to
the provider’s existing
commitments?
LTS LTS No No No No
f) Be served by a landfill with
sufficient permitted capacity to
accommodate the project’s solid
waste disposal needs?
LTS LTS No No No No
g) Comply with federal, state, and
local management and reduction
statutes and regulations related to
solid waste?
NI NI (IS) No No No No
Discussion:
The GP EIR found that regarding wastewater treatmen t and collection, services provided by the Sanitati on Districts of Los Angeles County, Los Angeles County Public Works Department, and PWP would adequately manage wastewater generated by buildout of the General Plan Update. Upon implementation of regulat ory requirements and standard conditions of approva l, such as payment of development fees and implementation of a site-specific Storm Water Pollution Preventions Plan for construction, the impact would be less than significant. Regarding water supply and d istribution, the GP EIR found that buildout of the General Plan Update would fall Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
within projections for PWP’s capacity; project requirements would be met by current services provided by PWP. Upon implementation of regulatory requirements and standard conditions of approval, such as implementation of mandatory co nservation measures, requiring the preparation of a Water Supply Assessment for development projects meeting certain size criteria, and requiring affirmative verification of sufficient water supply for certain residential subdivisions pursuant to SB 221, the impact would be less than significant.
Regarding solid waste, the GP EIR found that projec t buildout would be accommodated by existing servic e providers and facilities.
Upon implementation of regulatory requirements and standard conditions of approval, such as the inclus ion of storage areas for recyclable materials at future nonresidential and m ulti-family residential development projects pursuant to AB 341, recycling at least 50 percent of construction and demolition waste pursuant to the California Green Building Code, and solid waste reduction strategies under General Plan Policies 10.2 and 10.4, the impa ct would be less than significant. Regarding other utilities, including electricity, natural gas, and telecommunications, the GP EIR con cluded that future development under the General Pl an Update would be accommodated by existing service providers, and the impact would be less than significant. The GP EIR found that the project satisfied and complied with the City’s adopted General Plan Open Space and Conservation Element pertaining to water conservation, General Plan Safety Element pertaining to continued earthquake strengthening for utilities and protection of water supply, and state codes and regulations pertaining to utility services, and that the proposed updates to the General Plan Land Use Element regarding energy and water efficiency and conservation and solid waste reduction would create more sustainable standards for the future of the City. The IS prepared for the GP EIR found that buildout of the General Plan Update would be required to comply wit h all applicable solid waste regulations, including the California Integrated Wa ste Management Act and the City of Pasadena Zoning Code Section 17.40.120 (Refuse Storage Facilities) and, as such, no impact related to compliance with solid waste regulations would occur.
The specific zones identified by the project that would permit emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and safe parking uses are within the area analyzed by the GP EIR, and the same service provid ers would manage utility services for the future project uses within the pro posed zones. Furthermore, as discussed above, the p urpose of the project is to provide more inclusive standards and requirements to serve the City’s housing needs and, in part, impl ement elements of the City’s Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
2021-2029 Housing Element (2021-2029). The City has transmitted the Housing Element to Pasadena Water and Power Department, Pasadena Public Works Department, and the Los Angel es County Sanitation District to allow for populati on projections to be incorporated into their plans accordingly. In addition, while the scale and specific sites of future developments are currently unknown, program operators of the proposed uses would be req uired to ensure infrastructure capacity and connect ions are reviewed and approved by the City. Therefore, the proposed emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites are not anticipated to result in an exceedance of the capacity of existing utility facilities, and no new or expanded facilities are a nticipated to be needed to service buildout of the zones identified by the proposed project. Similar to the General Plan Update, future developments implemented under the proposed project would also be required to adhere to all applicable solid waste regulations. Therefore, implementation of the proposed emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites would have no impact related to compliance with solid waste regulations.
The current CEQA Guidelines Appendix G checklist also includes assessment criteria for potential impacts related to the relocation or construction of new or expanded electric power, natural gas, or telecommunications facilities. Similar to water, wastewater, and solid waste facilities, existing service providers would manage electricity, natural gas, and telecommunicat ions services for future developments under the proposed project. As discuss ed, the zones permitted by the proposed project are primarily built out under existing conditions. Thus, it is anticipated that any new development of emergency shelters, emergency shelters, limited, Low Barrier Navigation Centers, and safe parking uses in the allowed zones (by-right or with Minor Conditional Use Permits) would require lateral connections to mainlines in coordination with utility service providers, similar to what occurs under existing conditions. Therefore, the proposed emergency shelters, emergency shelters, li mited, Low Barrier Navigation Centers, safe parking uses, and carried forward Housing Element sites would result in less than significant impacts related to the relocation or construction of new or expanded electric power, natural gas, and telecommunications facilities.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Issues and Supporting Data
Sources:
Emergency
Shelter and
Other Code
Amendments
Impact
Conclusion
GP EIR Impact
Conclusion
Any New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information of
Substantial
Importance
That Was Not
and Could Not
Have Been
Known at the
Time of
Certification of
the GP EIR that
Rises to the
Level of
Requiring New
Analysis or
Verification?
Are Any New
Mitigation
Measures
Required for
the
Emergency
Shelter and
Other Code
Amendments?
In addition, the proposed change for the Reasonable Accommodation Policy and Procedures would be procedural in nature and would not result in impacts related to utilities and service systems.
No new significant impacts and no substantial incre ase in the severity of previously identified impact s associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
P age 3-74
Environmental Determination
B
ased upon the evidence in light of the whole record documented in the attached environmental checklist explanation, cited incorporations and attachments, the City finds that the Project:
H as previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. The proposed project is a component of the whole action analyzed in the previously adopted/certified CEQA document.
H as previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. Changes and additions to the earlier CEQA document are needed to make the previous documentation adequate to cover the project which are documented in this Addendum (CEQA Guidelines §15164). However, none of the conditions described in CEQA Guidelines Section 15162 that would require the preparation of a subsequent EIR have occurred.
H as previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. However, there is important new information and/or substantial changes have occurred requiring the preparation of an additional CEQA document (Negative Declaration or EIR) pursuant to CEQA Guidelines Sections 15162 through 15163.
Chapter 3: Evaluation of Environmental Impacts Eme rgency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Page Intentionally Left Blank
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
CHAPTER 4
MITIGATION MEASURES
A listing of applicable mitigation measures from the Pasadena General Plan Final Environmental Impact Report is presented below. The mitigation measures listed are the same as the measures in the Final EIR and would be applicable to the pro posed project. No new mitigation measures are required as a result of implementing the proposed project. The City, as the CEQA lead agency, is responsible for monitoring the implementation of the adopted mitigation measures.
Air Quality
2-1 Prior to issuance of any construction permits, dev elopment project applicants shall prepare and submit to the City of Pasadena Planning Division a technical assessment evaluating potential project construction-related a ir quality impacts. The evaluation shall be prepared in conformance with South Coast Air Quality Management District (SCAQMD) methodology for assessing air quality impacts. If construction-related criteria air pollutants are determined to have the potential to exceed the SCAQMD-adopted thresholds of significance, the City of Pasadena Planning Division shall require that applicants for new development projects incorporate mitigation measure s to reduce air pollutant emissions during construction activities. These identified me asures shall be incorporated into all appropriate construction documents (e.g., construction management plans) submitted to the City and shall be verified by the City’s Planning Division. Mitigation measures to reduce construction-related emissions include, but are not limited to:
• Requiring fugitive-dust control measures that exce ed SCAQMD’s Rule 403, such as:
• Use of nontoxic soil stabilizers to reduce wind er osion. • Applying water every four hours to active soil-dis turbing activities. • Tarping and/or maintaining a minimum of 24 inches of freeboard on trucks hauling dirt, sand, soil, or other loose materials.
• Using construction equipment rated by the United S tates Environmental Protection Agency as having Tier 3 (model year 2006 or newer) or Tier 4 (model year 2008 or newer) emission limits, applicable for engines between 50 and 750 horsepower. • Ensuring that construction equipment is properly s erviced and maintained to the manufacturer’s standards.
• Limiting nonessential idling of construction equip ment to no more than five consecutive minutes.
• Using Super-Compliant volatile organic compound (V OC) paints for coating of architectural surfaces whenever possible. A list of Super-Compliant architectural coating manufactures can be found on the SCAQMD’s w ebsite at http://www.aqmd.gov/prdas/brochures/Super-Compliant_AIM.pdf. 2-2 Prior to future discretionary project approval, de velopment project applicants shall prepare and submit to the City of Pasadena Planning Division a technical assessment evaluating potential project operation phase-related air quali ty impacts. The evaluation shall be prepared in conformance with SCAQMD methodology in assessing air quality impacts. If operation-related air pollutants are determined to have the potential to exceed the Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
SCAQMD-adopted thresholds of significance, the City of Pasadena Planning Division shall require that applicants for new development project s incorporate mitigation measures to reduce air pollutant emissions during operational activities. The identified measures shall be included as part of the Standard Conditions of Approval. Below are possible mitigation measures to reduce long-term emissions:
• Site-specific developments with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with California Air Resources Board Rule 2845 (13 California Code of Regulations Chapter 10 § 2485).
• Site-specific development shall demonstrate that a n adequate number of electrical vehicle Level 2 charging stations are provided onsi te. The location of the electrical outlets shall be specified on building plans, and proper installation shall be verified by the Building Division prior to issuance of a Certificate of Occupancy. • Applicant-provided appliances shall be Energy Star appliances (e.g., dishwashers, refrigerators, clothes washers, and dryers). Installation of Energy Star appliances shall be verified by the Building & Safety Division during plan check. • Applicants for future development projects along e xisting and planned transit routes shall coordinate with the City of Pasadena, Metro, and Foothill Transit to ensure that bus pads and shelters are incorporated, as appropriate.
2-4 Prior to future discretionary approval, the City o f Pasadena Planning Division shall evaluate new development proposals for sensitive la nd uses (e.g., residences, schools, and day care centers) within the City for potential incompatibilities with regard to the California Air Resources Board’s Air Quality and La nd Use Handbook: A Community Health Perspective (April 2005). In addition, appli cants for siting or expanding sensitive land uses that are within the recommended buffer di stances listed in Table 1-1 of the California Air Resources Board (CARB) Handbook shal l submit a HRA to the City of Pasadena. The HRA shall be prepared in accordance with policies and procedures of the state Office of Environmental Health Hazard Assessm ent (OEHHA) and the SCAQMD.
The latest OEHHA guidelines shall be used for the a nalysis, including age sensitivity factors, breathing rates, and body weights appropriate for children. If the HRA shows that the incremental cancer risk and/or noncancer hazard index exceeds the respective thresholds, as established by the SCAQMD at the tim e a project is considered, the applicant will be required to identify and demonstrate that mitigation measures are capable of reducing potential cancer and noncancer risks to an acceptable level (i.e., below the aforementioned thresholds as established by the SCA QMD), including appropriate enforcement mechanisms. Measures to reduce risk may include but are not limited to:
• Air intakes oriented away from high-volume roadway s and/or truck loading zones. • Heating, ventilation, and air conditioning systems of the buildings provided with appropriately sized maximum efficiency rating value (MERV) filters. • Heating, ventilation, and air conditioning systems for units that are installed with MERV filters shall maintain positive pressure within the building’s filtered ventilation system to reduce infiltration of unfiltered outdoor air.
Mitigation measures identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site development plan as a component of the proposed project. The air intake d esign and MERV filter requirements Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
shall be noted and/or reflected on all building pla ns submitted to the City and shall be verified by the City’s Planning Division. The inten t of this mitigation measure is to reflect current CARB and SCAQMD Guidance/Standards as well as CEQA legislation and case law, and the City implementation of the measure shall adhere to current standards/law at the time such analyses are undertaken.
Biological Resources
3-1 The City of Pasadena shall require applicants of f uture development projects that disturb undeveloped land in the San Rafael Hills and tract of land at the northwest intersection of Crestford Drive and Florecita Drive, to prepare a biological resources survey. The survey shall be conducted by a qualified biologist and shall be a reconnaissance level field survey of the project site for the presence and quality of biological resources potentially affected by project development. These resources include, bu t are not limited to, special status species or their habitat, sensitive habitats such a s wetlands or riparian areas, and jurisdictional waters. If sensitive or protected bi ological resources are absent from the project site and adjacent lands potentially affected by the project, the biologist shall submit a written report substantiating such to the City of Pasadena before issuance of a grading permit by the City, and the project may proceed without any further biological investigation.
If sensitive or protected biological resources are present on the project site or may be potentially affected by the project, implementation of Mitigation Measure 3-2 shall be required.
3-2 A qualified biologist shall evaluate impacts to se nsitive or protected biological resources from development. The impact assessment may require focused surveys that determine absence or presence and distribution of biological resources on the site. These surveys may include, but are not limited to: 1) focused spe cial status animal surveys if suitable habitat is present; 2) appropriately timed focused special status plant surveys that will maximize detection and accurate identification of target plant species; and 3) a delineation of jurisdictional boundaries around potential wetlands, riparian habitat, and waters of the United States or State. The results of these surveys will assist in assessing actual project impacts, and with the development of project-specif ic mitigation measures. Alternatively, the project applicant may forgo focused plant and a nimal surveys and assume presence of special status species in all suitable habitats on the project site. The qualified biologist shall substantiate the impact evaluation or the ass umed presence of special-status species in all suitable habitats onsite in a written report submitted to the City of Pasadena before issuance of a grading permit by the City.
3-3 The City of Pasadena shall require applicants of d evelopment project to avoid potential impacts to sensitive or protected biological resour ces to the greatest extent feasible.
Depending on the resources potentially present on t he project site, avoidance may include: 1) establishing appropriate no-disturbance buffers around onsite or adjacent resources, and/or 2) initiating construction at a t ime when special status or protected animal species will not be vulnerable to project-re lated mortality (e.g., outside the avian nesting season or bat maternal or wintering roostin g season). Consultation with relevant regulatory agencies may be required in order to est ablish suitable buffer areas. If the project avoids all sensitive or protected biological resources, no further action is required.
If avoidance of all significant impacts to sensitiv e or protected biological resources is not feasible, the project shall implement Mitigation Measure 3-4.
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
3-4 The City of Pasadena shall require applicants to d esign development projects to minimize potential impacts to sensitive or protected biologi cal resources to the greatest extent feasible, in consultation with a qualified biologis t and/or appropriate regulatory agency staff. Minimization measures may include 1) exclusion and/or silt fencing, 2) relocation of impacted resources, 3) construction monitoring by a qualified biologist, and 4) an informative training program conducted by a qualified biologist for construction personnel on sensitive biological resources that may be impac ted by project construction. If minimization of all significant impacts to sensitiv e or protected biological resources is infeasible, the project shall implement Mitigation Measure 3-5.
3-5 A qualified biologist will develop appropriate mit igations that will reduce project impacts to sensitive or protected biological resources to a le ss than significant level, if feasible. The type and amount of mitigation will depend on the re sources impacted, the extent of the impacts, and the quality of habitats to be impacted . Mitigations may include, but are not limited to: 1) compensation for lost habitat or waters in the form of preservation or creation of in-kind habitat or waters, either onsite or offs ite, protected by conservation easement; 2) purchase of appropriate credits from an approved mitigation bank servicing the Pasadena area; and 3) payment of in-lieu fees.
3-6 Applicants of projects developed pursuant to the G eneral Plan Update shall obtain appropriate permit authorization(s) for impacts to jurisdictional waters, wetlands, and/or riparian habitats. The types of permits potentially required for impacts to jurisdictional waters are a Clean Water Act (Section 404) permit i ssued by the US Army Corps of Engineers, a California Water Certificate or Waste Discharge Order issued by the Regional Water Quality Control Board, and a Stream Alteration Agreement issued by the California Department of Fish and Wildlife.
Cultural Resources
4-1 If cultural resources are discovered during constr uction of land development projects in Pasadena that may be eligible for listing in the California Register for Historic Resources, all ground disturbing activities in the immediate vicinity of the find shall be halted until the find is evaluated by a Registered Professional Arch aeologist. If testing determines that significance criteria are met, then the project sha ll be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; and provide a comprehensive final report including site record to the City and the South Central Coastal Information Center at California State University Fullerton. No further grading shall occur in the area of the discovery until Planning Department approves the report.
4-2 The City shall require applicants for development permits that involve grading in areas within the paleontologically sensitive Topanga formation to provide studies by a qualified paleontologist assessing the sensitivity of the project for buried paleontological resources.
On properties determined to be moderately to highly sensitive for paleontological resources, such studies shall provide a detailed mi tigation plan, including a monitoring program and recovery and/or in situ preservation plan, based on the recommendations of a qualified paleontologist. The mitigation plan shall include the following requirements:
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
• A paleontologist shall be retained for the project and will be on call during grading and other significant ground-disturbing activities more than six feet below the ground surface.
• Should any potentially significant fossil resource s be discovered, no further grading shall occur in the area of the discovery until the Planning and Community Development Director concurs in writing that adequate provision s are in place to protect any significant resources. Work may continue outside a minimum radius of 25 feet from the discovery pending review by the Director.
• Unanticipated discoveries shall be evaluated for s ignificance by a qualified paleontologist. If evaluation determines that signi ficance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; and provide a comprehensive final report, including catalog with museum numbers.
Greenhouse Gas Emissions
5-1 Within approximately 18 months of adoption of the p roposed General Plan Update, the City of Pasadena shall prepare and present to the City Council for adoption a community climate action plan/greenhouse gas reduction plan. The Plan shall identify strategies to be implemented to reduce GHG emissions associated with the City and shall include as one alternative a program that achieves the AB 32 targe ts. In addition, the City shall monitor GHG emissions by updating its community-wide GHG em issions inventory every five years upon adoption of the initial Plan. Upon the n ext update to the community climate action plan/greenhouse gas reduction plan, the inventory, GHG reduction measures, and GHG reductions shall be forecast to year 2035 to en sure progress toward achieving the interim target that aligns with the long-term GHG r eduction goals of Executive Order S- 03-04. The Plan update shall take into account the reductions achievable from federal and state actions and measures as well as ongoing work by the City and the private sector.
The 2035 Plan update shall be completed by January 1, 2021, with a plan to achieve GHG reductions for 2035 or 2040, provided the state has an actual plan to achieve reductions for 2035 or 2040. New reduction programs in similar sectors as the proposed Plan (building energy, transportation, waste, water, was tewater, agriculture, and others) will likely be necessary. Future targets shall be consid ered in alignment with state reduction targets, to the maximum extent feasible, but it is premature at this time to determine whether or not such targets can be feasibly met through the combination of federal, state, and local action given technical, logistical and financial constraints. Future updates to the community climate action plan/greenhouse gas reduct ion plan shall account for the horizon beyond 2035 as the state adopts actual plan s to meet post-2035 targets. In all instances, the community climate action plan/greenh ouse gas reduction plan and any updates shall be consistent with state and federal law.
Noise
9-1 Prior to issuance of building and occupancy permits, applicants of industrial projects that involve vibration-intensive machinery or activities adjacent to sensitive receptors shall prepare a study to evaluate potential vibration impacts. The study shall be prepared by an acoustical engineer and be submitted to the City of Pasadena Planning Division. The study shall evaluate the vibration levels associated with operation of project-related equipment and activities experienced by nearby sensitive receptors. If it is determined that vibration impacts to nearby receptors exceed the Federal Tran sit Administration (FTA) vibration- Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
annoyance criterion, the study shall recommend and the applicant shall implement the identified measures with the purpose of reducing vi bration impacts to a less than significant level. The City of Pasadena shall verif y implementation of all identified measures.
9-2 Prior to issuance of building permits for the new construction of habitable area, applicants for development projects shall adhere to the approp riate Vibration Category 2 and Vibration Category 3 screening distances for light rail transit as recommended in Table 9- 2 of FTA’s Transit Noise and Vibration Impact Asses sment (FTA 2006) in evaluating vibration impacts related to trains on the Metro Go ld Line. Applicants for development projects that fall within the screening distances s hall prepare and submit to the City of Pasadena Planning Division a study evaluating vibra tion impacts to the proposed development from train operations. The study shall be prepared by an acoustical engineer who shall identify measures to reduce impacts to ha bitable structures to below the FTA vibration annoyance criterion. The identified measures shall be incorporated into all design plans submitted to the City of Pasadena.
9-3 Prior to issuance of any grading and construction permits, applicants for individual projects that involve vibration-intensive construction activities, such as pile drivers, jack hammers, and vibratory rollers, within 25 feet of sensitive receptors (e.g., residences and historic structures) shall prepare and submit to the City of Pasadena Planning Division a study to evaluate potential construction-related vibration impacts. The study shall be prepared by an acoustical engineer and shall identify measures to reduce impacts to habitable structures to below the FTA vibration annoyance criterion. If construction-related vibration is determined to be perceptible at vibration-sensitive uses, additional requirements, such as use of less-vibration-intensive equipment or con struction technique, shall be implemented during construction (e.g., drilled pile s, static rollers, and nonexplosive rock blasting). Identified measures shall be included on all construction and building documents and submitted for verification to the City of Pasadena Planning Division.
9-4 Prior to issuance of any construction permits, applicants for individual projects that involve vibration-intensive construction activities, such as pile drivers, jack hammers, bulldozers, and vibratory rollers, within 25 feet of sensitive receptors (e.g., residences) or 50 feet of historic structures, shall prepare and submit to th e City of Pasadena Planning Division a study to evaluate potential construction-related vi bration impacts. The vibration assessment shall be prepared by an acoustical engin eer and be based on the FTA vibration-induced architectural damage criterion. I f the study determines a potential exceedance of the FTA thresholds, measures shall be identified that ensure vibration levels are reduced to below the thresholds. Measure s to reduce vibration levels can include use of less-vibration-intensive equipment ( e.g., drilled piles and static rollers) and/or construction techniques (e.g., nonexplosive rock blasting and use of hand tools) and preparation of a preconstruction survey report to assess the condition of the affected sensitive structure. Notwithstanding the above, pile drivers shall not be allowed within 150 feet of any historic structures. Identified measure s shall be included on all construction and building documents and submitted for verificati on to the City of Pasadena Planning Division.
9-5 Prior to issuance of construction permits, applicants for new development projects within 500 feet of noise-sensitive receptors shall impleme nt the following best management practices to reduce construction noise levels:
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
• Consider the installation of temporary sound barri ers for construction activities immediately adjacent to occupied noise-sensitive structures. • Equip construction equipment with mufflers.
• Restrict haul routes and construction-related traf fic. • Reduce nonessential idling of construction equipme nt to no more than five minutes.
The identified best management practices shall be n oted on all site plans and/or construction management plans and submitted for ver ification to the City of Pasadena Planning Division.
Transportation and Traffic
13-1 The City of Pasadena shall update its existing transportation impact fee program by 2020.
The City shall prepare a “Nexus” Study that will se rve as the basis for requiring development impact fees under AB 1600 legislation, as codified by California Code Government Section 66000 et seq. The established pr ocedures under AB 1600 require that a “reasonable relationship” or nexus exist bet ween the traffic improvements and facilities required to mitigate the traffic impacts of new development pursuant to the proposed project. After approval of the Nexus Study , the City shall update the transportation impact fee program to fund all citywide circulation improvements, including the pedestrian and bicycle network. The fee program shall stipulate that fees are assessed when there is new construction or when there is an increase in square footage within an existing building or the conversion of existing squ are footage to a more intensive use.
Fees are calculated by multiplying the proposed squ are footage or dwelling unit by the rate identified. The fees are included with any oth er applicable fees payable at the time the building permit is issued. The City will use the development fees to fund construction (or to recoup fees advanced to fund construction)
.
Chapter 4: Mitigation Measures Emergency Shelter a nd Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
Page Intentionally Left Blank
Chapter 5: List of Preparers Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023
CHAPTER 5
LIST OF PREPARERS
LEAD AGENCY
The City of Pasadena
Planning & Community Development Department
175 N. Garfield Avenue
Pasadena, CA 91101
David Sanchez, Principal Planner
Martin Potter, Senior Planner
PREPARED BY
Michael Baker International
3760 Kilroy Airport Way, Suite 270
Long Beach, California 90806
John Bellas, Project Director
Kathalyn Tung, Project Manager
Frankie Tong, Senior Environmental Planner
Vicky Rosen, Environmental Analyst
Chapter 5: List of Preparers Emergency Shelter and Other Code Amendments Addendum to the Pasadena General Plan EIR April 2023