INITIAL STUDY / MITIGATED NEGATIVE DECLARATION
Public Comment Period January 17 – March 3, 2023Project Description and BackgroundCEQA ProcessAnalysis of 21 Topical AreasSupporting Technical AppendicesLighting Study Air Quality and Greenhouse Gas ModelingBiological ResourcesHistorical ResourcesNoiseTransportation PROJECT DESCRIPTIONReorient and expand the existing driving range and construct a new miniature golf facility within the existing driving range area at the Brookside Golf Course. Improvements on 16 acres within the exiting driving range, Hole 10 of the C.W. Koiner Course, and Holes 6 and 7 of the E.O. Nay Course (Project Site). •Driving range expanded from 20 to 60 hitting bays, to serve the existing demand of golfers. Reoriented to northern direction of play.Replacement of driving range netting with 56 total poles (20 existing to remain and 36 new) to support replacement netting. Pole height ranges from 38 feet to 130 feet with an average pole height of 90.67 feet.Lighting to be provided on 14 poles, at 60 feet in height (not top of poles). “Top Tracer” type technology with instant shot replays and statistical feedback to enhance player experience.
PROJECT DESCRIPTION(Continued)Addition of 36 family-friendly holes of modern miniature golf on approximately one acre within the footprint of the existing driving range and adjacent to the Arroyo channel.Located in proximity to existing paths of travel, Brookside Clubhouse, and parking areas.Design of the miniature golf area would incorporate an arrangement of pathways and landscape elements. Structures less than 8 feet in height.Drought tolerant landscaping and artificial turf.Replacement turf, modified irrigation system, and other minor landscape modifications would be installed. Site furniture, signage, and markers would be updated. A new electrical service line with generator would be provided.
PROJECT DESCRIPTION(Continued)Project is intended to serve existing demand on driving range and further engage the youth and community that already live, recreate, and visit the Central Arroyo Seco area for recreational purposes. No new staff required. Hours of operation until 10:00 p.m.No conflict with other operational needs of the Golf Course or Stadium.Construction 8 months (driving range), then miniature golf (4 months).The RBOC is undertaking this environmental review concurrent with a substantial allocation of public funds toward the Project, even though the RBOC is not yet ready to break ground. There is no final design of the project at this stage.Design subject to the City’s Design Review process as defined in the Pasadena Municipal Code to ensure compatibility policies and objectives of the Arroyo Seco Design Guidelines and overall visual harmony with surroundings.
Figure 2Existing Project Site
Figure 3Driving Range andMiniature GolfConceptual Site Plan
Figure 4Driving Range Poles and Netting
No ImpactAgricultural and Forestry ResourcesEnergyHazards and Hazardous MaterialsHydrology and Water QualityLand UseMineral ResourcesPopulation and Housing Less than Significant ImpactAir QualityGeology and Soils Greenhouse Gas EmissionsNoise Public Services RecreationTransportation Utilities Wildfire AESTHETICSLight and Glare
Quantified Lighting Study using City thresholds.14 lighting poles, lighting fixtures at approx. 60 feet.Compliance with PMC 17.40.080, Outdoor Lighting.LED technology, remote operated, precise lighting directionality.Low-level illumination from miniature golf.Demonstrates lighting spill would not exceed 1 foot candle. Given no final design at this time, potentially significant.MITIGATION MEASURESLighting plan for final design and further testing to confirm no exceedance of 1 footcandle.
BIOLOGICAL RESOURCES
Biological Survey and ResearchTree Survey and ReportConsidered 47 Trees Potentially Removed.Compliance with City Tree Ordinance and coordination with Urban Forestry Advisory Commission (UFAC) and City ManagerLikely reduced to 27 (all non-native)Met with UFAC, RBOC will be requesting a 2:1 replacement ratio for tree removals.MITIGATION MEASURESPreconstruction surveys for nesting raptors.Ensure lighting is directed downward away from trees.
CULTURAL RESOURCESHistorical Resources •First Opened in 1925•NRHP & CRHR•Contributing feature of Arroyo Park and Recreation District•Changes consistent with historical uses•Changes to approx. 0.4% of DistrictWhile no impact to integrity of resource, no final design – therefore potential impactMITIGATION MEASURESRetain a qualified historic preservation professional to ensure alterations to the driving range, design of the miniature golf course, and overall modifications to the Course are compatible with the existing Brookside Golf Course landscape, the Pasadena Arroyo Park and Recreational District, and the ArroyoSeco Design Guidelines.
TRIBAL AND ARCHAEOLOGICAL RESOURCESConsultation with Native American tribes pursuant to AB 52Potential impacts from ground disturbing activities in native soilsMITIGATION MEASURESTribal and archeological monitors during construction activities.
RESPONSE TO PUBLIC COMMENTSPublic review Jan 17 – March 341 comment emails/lettersVerbal comments at public meetingsResponse to comments documentSix “topical responses”Responses to all comments providedAll comments adequately addressed in CEQA documentMND content and process meet requirements of CEQA OUTREACH9/22/2021 – Pasadena Heritage Meeting 9/20/2022 – Virtual Neighborhood Meeting10/4/2022 – Golf Committee Presentation10/5/2022 – Golf Advisory Committee 10/5/2022 – Virtual West Pasadena Residents Association Meeting10/6/2022 – RBOC Board Presentation10/11/2022 – Ladies Club EO Nay Presentation10/11/2022 – Greens Committee Presentation10/12/2022 – Ladies Club Presentation11/8/2022 – Men’s Club Presentation11/17/2022 – Linda Vista | Annandale Association Resident In-Person Meeting1/17/2023 – Mailer to 1k+ Residents1/30/2023 – Email Men’s Club Database1/30/2023 – Email RBOC Board and Stakeholders 2/1/2023 – Email 15k RBOC Resident Database2/2/2023 – Email 27k in Brookside Database2/13/2023 – CEQA Informational Meeting5/4/2023 - RBOC Board Meeting5/16/2023 – RBOC Board Meeting
POSITIVE IMPACT FOR FIRST TEE OF GREATER PASADENAThe expansion and reorientation of the driving range, aswell as the addition to the 36 hole miniature golf coursewould create positive impact on the First T ee of GreaterPasadena. As a non-profit organization that annuallywelcomes and services more than 40,000 youth andveterans to the chapter’s programs through the game ofgolf, these improvements at Brookside w i l l undoubtedlyprovide expanded areas for training, teaching, andlearning amongst all skill levels. The range expansion alsoaccounts for the current range needs of the First T ee ofGreater Pasadena enabling to continue their programing atBrookside.
REQUESTED ACTIONSAdopt Initial Study/Mitigated Negative Declaration and Mitigation Monitoring Reporting ProgramApprove $1,000,000 loan toward further development of project VIDEO