Cities Index.
AR 14 PPT POWERPOINT

Pasadena City Council
December 4, 2023

Document
AR 14 PPT POWERPOINT
Meeting
December 4, 2023
Body
Pasadena City Council
Original file
1.3 MB
Text extracted from the city's file for reading and search. Open the original on ww2.cityofpasadena.net. That file is the official record.

Planning & Community Development
Research and Development (R&D)
Zoning Code Amendments
City Council
December 4, 2023
Planning & Community Development
Background
• Pasadena is a hub for the life science industry in the Los Angeles region • The City Council’s Economic Development and Technology Committee (ED Tech) directed staff to identify incentives the City could implement to attract and retain life science facilities in Pasadena. • Staff met with life science industry stakeholders to get feedback on potential code amendments which were presented to the Planning Commission.
• Planning Commission held a Study Session and a Public Hearing to discuss potential zoning code amendments.
2 Planning & Community Development
Existing Development Standards
3 Research and Development –Office Research and Development - Non-Office Definition: Facilities that are primarily
office uses for scientific research. (over
50% office space)
Definition: A laboratory facility that is
primarily used for non-office scientific
research. (over 50% lab space)
Parking:
• 3 spaces per 1,000 sq. ft.
• In new Specific Plans, no parking
required for the first 5,000 sq. ft. of a
project
Parking:
• 2 spaces per 1,000 sq. ft.

Zones Allowed:
• Allowed by-right in non-residential and
mixed-use zones
• CUP for new construction over 25,000
square feet in all zones
Zones Allowed:
• Allowed with a CUP in certain
commercial zones
• Allowed by-right in non-residential and
mixed-use zones
• CUP for new construction over 25,000
square feet in all zones
Planning & Community Development
Proposed Code Amendments

1. R&D Land Use
> Consolidate the definition from R&D (office) and R&D (non-office) into R&D > Allow by-right in non-residential and mixed-use zones and with a CUP in the PS Zone

2. Conditional Use Permit Requirement
> Remove CUP requirement for major construction projects over 25,000 square feet > Remove the MCUP requirement for projects over 15,000 square feet in TOD areas

3. Parking Flexibility
> Allow a parking space ratio of 2 parking spaces per every 1,000 square feet of gross floor area for all R&D land uses

4. Building Height
> Allow additional 12 ft to building height by-right
> Allow additional height with an MCUP

5. Appurtenance Rooftop Coverage
> Allow additional rooftop coverage of 75% for appurtenance height of 18 ft > Allow additional coverage and appurtenance height with an MCUP 4 Planning & Community Development
Proposed Code Amendments

6. Floor Area Ratio (FAR) Requirements
> Exempt mechanical spaces from the FAR requirements

7. Open Space
> Reduce Open Space requirements for the use up to 60% and exclude mechanical space from the gross floor area calculation in relation to open space requirements

8. Frontage (Ground Floor) Requirements
> Remove the ground floor prohibition for R&D uses in Central District, East Colorado, and South Fair Oaks Specific Plans
> Clarify that the use prohibition would remain in the Central District Specific Plan in the CD- MU-C zone along two key corridors:
> Colorado Boulevard (within the Old Pasadena and Playhouse area) > South Lake Avenue within the CD-CL zone (east side of Lake Avenue) 5 Planning & Community Development
Planning Commission
Recommendation
6 • Staff supports incorporating the two recommendations from the Planning Commission:
> Clarify that the Research and Development (R&D) use should not include the distribution of products and clarify examples of the types of activities involved in the use, and
> Expand the use beyond scientific research and development to include other forms of research.

Planning & Community Development
Recommendation
7 • Staff recommends that City Council:

1. Find the proposed Amendments exempt from the California Environmental Quality Act (CEQA);

2. Adopt the Findings for the Amendments; and

3. Approve the recommended Amendments.

Planning & Community Development
Research and Development (R&D)
Zoning Code Amendments
City Council
December 4, 2023
Planning & Community Development
Existing and Proposed Zoning Code
9 Existing Proposed
R&D Land Use Research and Development —Office. Facilities that are primarily office uses for scientific research. This use can include the design, development, and testing of biological, chemical, electrical, magnetic, mechanical, and/or optical components in advance of product manufacturing. This use does not involve the fabrication, mass manufacture, or
processing of the products.

Use is permitted by-right in commercial and industrial zones Consolidate definition to from Research and Development — Office and Research and Development —Non-Office into
Research and Development.

Research and Development would be permitted:
• By-right in non-residential and mixed-use zones;
• With a Conditional Use Permit (CUP) in the Public and Semi-public (PS) Zone.

Research and Development —Non-Office. A laboratory
facility that is primarily used for non-office scientific research.

This use can include the design, development, and testing of biological, chemical, electrical, magnetic, mechanical, and/or optical components in advance of product manufacturing.

This use does not involve the fabrication, mass manufacture, or processing of the products.

Use is permitted by-right in some commercial and industrial zones and with a conditional use permit in some commercial and industrial zones.

CUP Requirements The CUP for major construction, specific to R&D land uses, is only required in certain zones.

A Minor Conditional Use Permit (MCUP) is required for any proposed commercial projects within a ¼ mile radius of a Metro A Line Station that exceed 15,000 square feet of gross floor area.

Remove CUP requirement for major construction over 25,000 square feet for consistency between zones and MCUP for
projects over 15,000 square feet within a ¼ mile radius of a Metro A Line Station.

Planning & Community Development
Existing and Proposed Zoning Code
10 Existing Proposed
Parking Flexibility Research and Development —Office.
3 spaces per 1,000 square feet
Create a parking ratio of 2 per 1,000 square feet, which may be exceeded by up to 50%.

Research and Development —Non-Office.
2 spaces per 1,000 square feet
Building Height Height limit may be exceeded by 10 feet to accommodate additional mechanical equipment with MCUP.

Allow R&D land uses to exceed the height 12 feet by-right. Any additional height would require a MCUP.

Appurtenance
Rooftop Coverage
The allowable appurtenance roof coverage for research and development facilities may exceed the height limit by 15 feet for up to 50 percent of the roof area with MCUP.

Allow R&D land uses to exceed the appurtenance height limit by 18 feet for up to 75 percent of the roof area. Any additional coverage and appurtenance height would require a MCUP.

Floor Area Ratio
(FAR) Requirements
Floor area as permitted by Zoning District. FAR calculations for R&D uses will exclude mechanical spaces.

Planning & Community Development
Existing and Proposed Zoning Code
11 Existing Proposed
Open Space Research and Development facilities with more than 40,000 square feet of non-residential floor area may reduce the Common Open Space area requirement by a maximum of 50
percent, subject to the review and approval of the Design Commission.

Research and Development facilities with more than 80,000 square feet of gross floor area may reduce the Publicly Accessible Open Space area requirement by a maximum of 50 percent, subject to the review and approval of the Design Commission.

Projects utilizing an Open Space reduction shall be restricted to Research and Development uses for a minimum period of 5 years after Certificate of Occupancy. Any change of use prior to 5 years shall be subject to standard Open Space
requirements.

Allow 60% reduction for R&D uses in all zones where the use is permitted and to exclude mechanical space from the floor area calculation in relation to open space requirements.

Ground Floor
Requirements
Use is not permitted on the ground floor within 35’ of the sidewalk in certain zones.

Remove ground floor prohibition in East Colorado and South Fair Oaks Specific Plans.

Clarify that the use prohibition would remain in CD-MU-C zone along Colorado Boulevard and in the CD-CL zone along the east side of South Lake Avenue.

Planning & Community Development
Parking Maximums
• Transit-Oriented Development (TOD)
> Applies to new Projects located within a designated TOD area of a radius of 1,320 feet (¼ mile) from a light-rail station platform.
> The minimum number of required off-street parking spaces shall be reduced by 25 percent
• Outside of TOD Areas
> Additional spaces up to a maximum of 50 percent above the required minimum/maximum are allowed as a matter of right, without any discretionary review by the City.
> Additional spaces above 50 percent of the required minimum/maximum are allowed only upon the approval of a Variance.
12 Planning & Community Development
Existing Land Uses Definitions
• Research and Development — Office (land use)
Facilities that are primarily office uses for scientific research. This use can include the design, development, and testing of biological, chemical, electrical, magnetic, mechanical, and/or optical components in advance of product manufacturing. This use does not involve the fabrication, mass manufacture, or processing of the products. • Research and Development — Non-Office (land use)
A laboratory facility that is primarily used for non-office scientific research. This use can include the design, development, and testing of biological, chemical, electrical, magnetic, mechanical, and/or optical components in advance of product manufacturing. This use does not involve the fabrication, mass manufacture, or processing of the products.
13 Planning & Community Development
Proposed Land Uses Definition
• Research and Development (land use)
Facilities that are used for research and development. This use can include the design, development, assembling, prototyping and testing of, but is not limited to, biological, chemical, electrical, magnetic, mechanical, and/or optical components or processes in advance of product manufacturing. This use may include fabrication and manufacturing for research and development purposes. This use does not involve the fabrication, manufacturing, or processing of products for mass distribution
14 Planning & Community Development
Existing Manufacturing Definitions
• Industry, Standard (land use).

The manufacturing of products, primarily from extracted or raw materials, or bulk storage and handling of the products and materials. Uses in this classification involve an incidence of truck or rail traffic, and/or outdoor storage of products, materials, equipment, or bulk fuel. These uses include food processing and packaging, laundry and dry- cleaning plants greater than 5,000 square feet in size, auto dismantling within an enclosed building, stonework and concrete products manufacture (excluding concrete ready-mix plants), small animal production and processing within an enclosed building, and power generation.
• Industry, Restricted (land use).

The manufacturing of finished parts or products primarily from previously prepared materials; and provision of industrial services within an enclosed building. These uses include processing, fabrication, assembly and treatment, but exclude basic industrial processing from raw materials, food processing, and vehicle/equipment services. Commercial bakeries that provide seating for on-site consumption shall be classified as take-out restaurants. • Industry, Restricted, Small-Scale (land use).

Limited to a maximum gross floor area of 5,000 square feet. 15 Planning & Community Development
Existing Zoning Map – R&D
16 Planning & Community Development
Proposed Zoning Map – R&D
17 Planning & Community Development
Existing PS Zone Permitted Uses
18 • Permitted with a CUP
> Residential land uses
 Caretaker quarters, Dormitories, Fraternity/sorority housing , multi-family, residential accessory uses and structures, residential car (limited and general), senior affordable housing, single-family housing, supportive housing, transitional housing > Recreation, Education & Public Assembly Uses
 Clubs, lodges, private meeting halls, colleges, commercial recreation outdoor, conference centers, cultural institutions, park and recreation facilities, religious facilities, religious facilities with temporary homeless shelter, schools- public and private > Office, Professional and Business Uses
 Offices (administrative business professional, government, medical) > Retail Sales
 Alcohol sales, bars or taverns, commercial nurseries, restaurants, retail sales, swap meets > Services
 Adult day care, general, Child day care centers, filming long term, life/care facilities, medical services (extended care, hospitals), Maintenance and service facilities, public safety facilities > Industry, Manufacturing and Processing Uses
 Recycling- small collection facilities
> Transportation, Communications & Utility Uses
 Heliports, Transportation terminals, utilities, wireless telecommunications facilities major • Permitted by-right
> Home occupations, filming – short term, vehicle services (washing/detailing, small scale), Wireless telecommunications facilities, SCL • Permitted with MCUP
> Religious facilities with columbarium, wireless telecommunications facilities minor Planning & Community Development
CUP Findings
19 • Findings and decision. Following a public hearing, the applicable review authority may approve, conditionally approve, or disapprove an application for a Conditional Use Permit. The review authority may approve a Conditional Use Permit (Major and Minor) only after first finding that:

1. The proposed use is allowed with a Conditional Use Permit (Major and Minor) or Hillside Development Permit within the applicable zoning district and complies with all applicable provisions of this Zoning Code;

2. The location of the proposed use complies with the special purposes of this Zoning Code and the purposes of the applicable zoning district;

3. The proposed use is in conformance with the goals, policies, and objectives of the General Plan and the purpose and intent of any applicable specific plan;

4. The establishment, maintenance, or operation of the use would not, under the circumstances of the particular case, be detrimental to the health, safety, or general welfare of persons residing or working in the neighborhood of the proposed use;

5. The use, as described and conditionally approved, would not be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the City; and

6. The design, location, operating characteristics, and size of the proposed use would be compatible with the existing and future land uses in the vicinity in terms of aesthetic values, character, scale, and view protection.

Planning & Community Development
Open Space Requirements - ECSP
• Common Open Space
> For projects with over 40,000 square feet of building area is 5% of the gross floor area.
> Research and Development facilities may reduce the Common Open Space area requirement by a maximum of 50%, subject to the review and approval of the Design Commission.
• Publicly Accessible Open Space
> For projects over or 80,000 square feet ranges from 2 - 5% of gross floor area, scaling up based on the size of the project.
> Research and Development facilities may reduce the Publicly Accessible Open Space area requirement by a maximum of 50%, subject to the review and approval of the Design Commission.
• Must remain research and development use for a minimum period of 5 years after the Certificate of Occupancy
Project Size (GFA) 80,000—119,999 sq ft 120,000+ sq ft 160,000—199,999 sq ft 200,000+ sq ft Per Project, sq ft 2% 3% 4% 5%
Planning & Community Development
Open Space Requirements - SFOSP
• Common Open Space
> For projects with over 40,000 square feet of building area is 5% of the gross floor area.
• Publicly Accessible Open Space
> For projects over or 60,000 square feet ranges from 2 - 5% of gross floor area, scaling up based on the size of the project.

Project Size (GFA) 60,000-119,999 sq ft 120,000-159,999 sq ft 160,000—199,999 sq ft 200,000+ sq ft Projects within 500
feet of a Metro station
platform
4% 5%
Projects outside 500
feet of a Metro station
platform
2% 3% 4% 5%
Planning & Community Development
Open Space Requirements - LASP
• Common Open Space
> For projects with over 40,000 square feet of building area is 5% of the gross floor area.
• Publicly Accessible Open Space
> For projects over or 80,000 square feet ranges from 2 - 3% of gross floor area, scaling up based on the size of the project.

Project Size (GFA) 80,000-119,999 sq ft 120,000+ sq ft
Per Project, sq ft 2% 3%
Planning & Community Development
Open Space Requirements - CDSP
• Common Open Space
> For projects with over 40,000 square feet of building area is 5% of the gross floor area.
• Publicly Accessible Open Space
> For projects over or 80,000 square feet ranges from 2 - 5% of gross floor area, scaling up based on the size of the project.

Project Size (GFA) 80,000—119,999 sq ft 120,000+ sq ft 160,000—199,999 sq ft 200,000+ sq ft Per Project, sq ft 2% 3% 4% 5%
Exception: Projects with less than 80,000 square feet of GFA and selected for plaza development at the northeast corner of Lake Avenue and California Boulevard shall provide a minimum of 400 square feet of PAOS as a corner plaza.

Planning & Community Development
Use is not permitted on the ground floor within 35’ of the sidewalk Existing Ground Floor Requirement
Planning & Community Development
Use is not permitted on the ground floor within 35’ of
the sidewalk
Existing Ground Floor Requirement

Planning & Community Development
Use is not permitted on the ground floor within 35’ of the sidewalk Existing Ground Floor Requirement
Planning & Community Development
Continue to prohibit R&D use on ground floor within 35 feet include frontages along Colorado Blvd in the CD-MU-C zone and along the east side of S Lake Ave in the CD-CL zone, shown in pink.

Proposed Ground Floor Requirement
Planning & Community Development
Ground Floor Requirement
Planning & Community Development
Transparency Requirements - ECSP
• Windows and Doors
> Street-facing facades shall incorporate glass providing views into work, display, sales, lobby, or similar active areas.
> Minimum transparency requirement is 70% for ground floors and 30% for the overall façade > Windows recessed by a minimum of 2 inches from the facades > Use of color-tinted, mirrored, or highly reflect glass is prohibited > Blinds, drapes, posters, and shelving for product displays visible to the public right-of-way shall obscure a maximum of 10% of the transparent areas of each respective storefront or 50% for medical office uses
• Blank Walls
> Windowless expanses of walls shall not exceed 20 ft in length • Security Bars
> Any exterior or interior security bars shall be designed to be fully hidden from view during business hours with devices such as concealed side pockets and ceiling cavities.

Planning & Community Development
Transparency Requirements - SFOSP
• Windows and Doors
> Street-facing facades shall incorporate glass providing views into work, display, sales, lobby, or similar active areas.
> Windows recessed by a minimum of 2 inches from the facades > Use of color-tinted, mirrored, or highly reflect glass is prohibited > Blinds, drapes, posters, and shelving for product displays visible to the public right-of-way shall obscure a maximum of 10% of the transparent areas of each respective storefront or 50% for medical office uses
• Blank Walls
> Windowless expanses of walls shall not exceed 20 ft in length • Security Bars
> Any exterior or interior security bars shall be designed to be fully hidden from view during business hours with devices such as concealed side pockets and ceiling cavities.

Planning & Community Development
Transparency Requirements - LASP
• Windows and Doors
> Windows recessed by a minimum of 2 inches from the facades > Use of color-tinted, mirrored, or highly reflect glass is prohibited > Blinds, drapes, posters, and shelving for product displays visible to the public right-of-way shall obscure a maximum of 10% of the transparent areas of each respective storefront or 50% for medical office uses
• Blank Walls
> Windowless expanses of walls shall not exceed 20 ft in length • Security Bars
> Any exterior or interior security bars shall be designed to be fully hidden from view during business hours with devices such as concealed side pockets and ceiling cavities.

Planning & Community Development
Transparency Requirements - CDSP
• Windows and Doors
> Street-facing facades shall incorporate glass providing views into work, display, sales, lobby, or similar active areas.
> Minimum transparency requirement is 70% for ground floors and 30% for the overall façade > Windows recessed by a minimum of 3 inches from the facades > Use of color-tinted, mirrored, or highly reflect glass is prohibited > Blinds, drapes, posters, and shelving for product displays visible to the public right-of-way shall obscure a maximum of 10% of the transparent areas of each respective storefront or 50% for medical office uses
• Blank Walls
> Windowless expanses of walls shall not exceed 20 ft in length • Security Bars
> Any exterior or interior security bars shall be designed to be fully hidden from view during business hours with devices such as concealed side pockets and ceiling cavities.

Planning & Community Development
Appurtenance
• Existing Definition
> A tower, spire, cupola, chimney, penthouse, water tank, flagpole, theater scenery loft, radio or television antenna, transmission tower, fire equipment, or other similar structure that is attached to a structure and not intended for human occupancy.
33 Planning & Community Development
Existing Exceptions and Incentives
• Construction Tax Exception
• Pasadena Water and Power Rebate Programs
> EV Charger Incentive Program
> Simple Business Rebate Program
> Customized Incentive Program
> Economic Development Rate
• Zoning Code
> Section 17.50.240 (Research and Development Facilities)  Allows R&D uses to exceed the base zone height by 10 feet with a MCUP  Allows R&D facilities’ appurtenances covering no more than 50 percent of the roof to exceed the height limit established by the applicable zoning district by 15 feet with a MCUP 34 Planning & Community Development
Existing R&D Regulations in ECSP
• East Colorado Specific Plan (Adopted 2022)
> Dedicated Plan Subarea - Mid-City Innovation District > Open Space:
 Research and Development facilities with more than 40,000 square feet of non-residential floor area may reduce the Common Open Space area requirement by a maximum of 50 percent, subject to the review and approval of the Design Commission.  Research and Development facilities with more than 80,000 square feet of gross floor area may reduce the Publicly Accessible Open Space area requirement by a maximum of 50 percent, subject to the review and approval of the Design Commission.  Must remain research and development use for a minimum period of 5 years after the Certificate of Occupancy
> Parking Requirement R&D (Office) is 3 spaces per 1,000 sq. ft. In EC-MU-C Zone, the parking requirement is 2 per 1,000 sq. ft > No parking required for the first 5,000 sq. ft. of a project for the use > R&D uses in the EC-MU-C Zone are not permitted on the ground floor within 35 ft of the sidewalk line on Colorado Blvd, Green Street, and Allen Ave.
35

← All documents from this meeting