Exhibit A
City of Pasadena
FY 2025 Road Maintenance and Rehabilitation Account (RMRA) Fund Project List
1. Project Name: Annual Citywide Street Resurfacing and ADA Improvement Program FY 2025
Total Estimated Project Cost: $10,200,000
FY 2025 RMRA Fund Appropriation Amount: $3,600,000
Description: This project provides for resurfacing or microsurfacing work on 30 streets (34 street segments) throughout the City for a total of 8.0 centerline miles. This resurfacing project will utilize rubberized asphalt, a noise-reducing pavement material that consists of a regular asphalt concrete mixed with crumb rubber made from recycled tires. This sustainable paving practice diverts tires from the waste stream, with this project having the capacity to divert over 10,000 tires from landfills. In addition, rubberized asphalt pavement lasts longer, is more resistant to cracking, reduces vehicle noise, provides for better skid resistance, and retains a darker color that provides contrast to new pavement markings.
Road segments listed below:
STREETLIMITS
1ARWIN STLA CANADA VERDUGO
RDTOWINSORAVE
2ATCHISON STLAKE AVETOEAST CITY LIMIT
3CANEDO PLWIERFIELD DRTOSOUTH END
4LAUREL BAY DRSYCAMORE GLENTOELMWOOD DR
5MICHILLINDAAVELANDFAIR RDTOGREENHILLROAD
6MOUNTAIN STCRAIG AVETOALTADENA DRIVE
7RANDOLPH AVESAN PASQUALE STTOCALIFORNIA BLVD
8RIDGE WAYOAK KNOLL AVETO1464 RIDGE WAY
9ROSITA LNNITHDALE RDTOSOUTH END
10SANTA PAULA AVEALAMEDA STTOFOOTHILL BLVD
11THORNDIKE RDWEST ENDTOEAST END
12WIERFIELD DRCAN EDO PLTOGLEN OAKS BLVD
13ARROYO BLVDARROYO BLVD ROSE
BOWL LOOPTOROSEMONT AVENUE
14ARROYO BLVDWASHINGTON
BOULEVARDTOROSEMONT AVENUE
15ARROYO BLVDARWIN STREET
TOWOODBURY ROAD
Exhibit A
City of Pasadena
FY 2025 Road Maintenance and Rehabilitation Account (RMRA) Fund Project List
16ARROYO BLVD
ROSE BOWL LOOPSECO STTOSECO ST
17ASBURY STHILL AVETOALLEN AVE
18CHULA VISTA AVENORTH ENDTOSOUTH END
19CHULA VISTA PLLINDA VtSTAAVETOCHULA VISTA AVE
20CORONA DRMARENGO AVETOROBINCROFT DR
21DOUGLAS STMARENGO AVETOLOS ROBLES AVE
22GLEN HOLLY DRLA LOMA RDTOCHEVIOTDALE DR
23INVERNESS DRNORMANDY DRTOLINDA VISTA AVE
24INVERNESS DRNORTH CITY LIMITTONORMANDY DR
25MADISON AVECOLORADO BLVDTODEL MAR BLVD
26Ml RA VISTA
TERRACELINDA VISTA AVETOLINDA VISTA AVE
27NORMANDY DRNORTH CITY LIMITTOINVERNESS DR
28PALISADE STMENTONE AVETOGLEN AVE
29PLEASANT WAY#1614 PLEASANT WAY TOKAWEAH DR
30QUEENSBERRY
RDALLEN AVETOALTADENA DR
31RAILROAD STFAIR OAKS AVETOSTATE ST
32ROBINCROFT DRMARENGO AVETOGARFIELDAVE
33ROSE BOWL DRARROYO BLVDTOROSEMONT AVE
34ROSEMONT AVEWASHINGTON BLVDTOSECO ST
Schedule: Resurfacing will be completed in FY 2025
Project Useful Life: 15 years