ST
Not expected to occur forbreeding or foraging; mayoccur as a migrant fly-over.

Aquila chrysaetos
golden eagle
Uncommon permanent resident andmigrant throughout California, exceptcenter of Central Valley. More common insouthern California than in north. Rangesfrom sea level up to 3833 m (0-11,500 ft).Generally, occurs in rolling foothills,mountain areas, sage-juniper flats, anddesert habitats. Breeding in SouthernCalifornia breeding birds are primarilyrestricted to rugged, mountainous country(Garrettand Dunn 1981).

FP
Not expected to occur forbreeding or foraging; mayoccur as a fly-over.

Athene cunicularia
burrowing owl (burrowand wintering sites)
Breeds and forages in grasslands andprefers flat to low, rolling hills in treelessterrain. Nests in burrows, typically in openhabitats, most often along banks androadsides. ssc Not expected to occur; no suitable habitat.

Vireo belli! pusillus
least Bell's vireo(nesting)
Riparian habitats dominated by willowswith dense understory vegetation betweensea level and 1,500 feet above msl.

FE SE No Not expected to occur; no suitable habitat.

Riparia riparia
bank swallow
Breeds in riparian areas with vertical cliffsand banks with fine-textured sandy soil inwhich it digs nesting holes.

ST Not expected to occur; no suitable habitat.

E-ll
Appendix E - Special Status Species Potentially Occurring in the Region TABLE E-2

SPECIAL STATUS WILDLIFE SPECIES REPORTED FROM THE PROJECT AREA Species General Habitat/Range Description | USFWS | CDFW Critical
Habitat
Present in the
Study Area" Potential for Occurrence
Polioptila californicacalifornica
coastal Californiagnatcataher
In California, this species is an obligateresident of several distinct subassociations of the coastal sage scrubvegetation type. The gnatcatcher has beenrecorded from sea level to approximately3,000 feet above msl (USFWS 2003);however, greater than 90 percent ofgnatcatcher records are from between sea level and 820 feet above msl along thecoast and between sea level and1,800 feet above msl inland (Atwood andBolsinger1992).

FT ssc No Not expected to occur; no suitable habitat.
lcteria wrens
yellow-breasted chat
For nesting, this species requires dense,brushy tangles near water and riparianwoodlands that support a thick understory. ssc Not expected to occur; no suitable habitat.

Agelaius tricolor
tricolored blackbird
(nesting)
This colonial nesting species prefers tobreed in freshwater marshes dominated bycattails (Typha spp.) and bulrushes{Scirpus or Schoenoplectus spp.), withwillows (SaA'xspp.) and nettles (Urticaspp.) also common. The introducedmustards (Brassica spp.), blackberries(Rubus spp.), thistles [Circium spp.), andmallows (Malva spp.) have beencommonly used for several decades.

ST,SSC Not expected to occur; no suitable habitat.

Setophaga petechia
yellow warbler
Riparian habitats dominated by willowswith dense understory vegetation betweensea level and 9,000 feet above msl. ssc Not expected to occur; no suitable habitat.

E-12
Appendix E - Special Status Species Potentially Occurring in the Region TABLE E-2

SPECIAL STATUS WILDLIFE SPECIES REPORTED FROM THE PROJECT AREA Species General Habitat/Range Description USFWS CDFW
CriticalHabitat
Present in the
Study Area" Potential for Occurrence
MammalsBassariscus astutus
Ring-tailed cat
Dry, rocky, or mountainous areas withscattered oaks and conifers. Dens amongrock crevices or in burrows, hollow trees,or attics by day. Strictly nocturnal, seldomemerges before dark. Fairly commonthroughout range.

FP Not expected to occur; no suitable habitat.

Neotoma lepida intermedia
San Diego desertwood rat
Common to abundant in Joshua tree,Pinyon-juniper, mixed and chamiseredshank chaparral, sagebrush, and mostdesert habitats. Also found in a variety ofother habitats. Most abundant in rockyareas with Joshua trees. Elevational rangefrom sea level to 2600 m(8500 ft).Northern and elevational distribution maybe limited by temperature. ssc Not expected to occur; no suitable habitat.

Onychomys torridus
southern grasshoppermouse
Common in arid desert habitats of theMojave Desert and southern Central Valleyof California. Alkali desert scrub and desertscrub habitats are preferred, withsomewhat lower densities expected inother desert habitats, including succulentshrub, wash, and riparian areas. Alsooccurs in coastal scrub, mixed chaparral,sagebrush, low sage, and bitterbrushhabitats. ssc Not expected to occur; no suitable habitat.

E-13
Appendix E - Special Status Species Potentially Occurring in the Region TABLE E-2

SPECIAL STATUS WILDLIFE SPECIES REPORTED FROM THE PROJECT AREA Species General Habitat/Range Description | USFWS CDFW
Critical
Habitat
Present in the
Study Area" Potential for Occurrence
Choeronycteris mexicana
Mexican longtongued bat
Occurs in arid habitats and roosts in caves,buildings, crevices, and mines. Speciestypically found in dimly lit areas nearpreferred food source of ornamental treesor large native plants with sufficient nectar,including agaves, cacti, avocado, bananaplants, etc. ssc Not expected to occur; no suitable habitat.

Macrotus californicus
California leaf-nosed bat
Occurs in desert lowlands. The speciesroosts in caves and cave-like structures,and forages in desert washes andfloodplains, and dry, sandy washes withriparian tree vegetation. Extirpated from allknown non-desert sites north of SanDiego. ssc Not expected to occur; no suitable habitat..

Antrozous pattidus
pallid bat
Occurs in grasslands, shrublands, andwoodlands and in open habitats with rockyareas or man-made structures for roosting.Species can also roost in caves and trees.Species typically forages in rural orundeveloped, natural areas and is mostlyabsent in urban and suburban areas. ssc Not expected to occur; no suitable habitat.

Corynorhinus townsendii
Townsend's big-earedbat
Occurs in oak woodlands, arid deserts,grasslands, along the coast, and highelevation forests and meadows. Populationcenters occur near large, minimallydisturbed cavities, including both naturalcaves and man-made structures. ssc Not expected to occur; no suitable habitat.

Lasiurus blossevillii
western red bat
Roosts in trees typically associated withriparian habitats where cottonwoods, oaks,sycamores, and walnuts are present. Alsoknown to roost in orchards trees. ssc Not expected to occur; no suitable habitat.

E-14
Appendix E - Special Status Species Potentially Occurring in the Region TABLE E-2

SPECIAL STATUS WILDLIFE SPECIES REPORTED FROM THE PROJECT AREA Species General Habitat/Range Description ] USFWS ] CDFW Critical
Habitat
Present in the
Study Area' Potential for Occurrence
Lasiurus xamtjomis
western yellow bat
This is a tree-roosting species mostcommonly found roosting in groves of palmtrees with skirts of dead fronds. Alsodocumented roosting in large cottonwoodtrees. Found in the arid environment of thesouthwestern U.S., the Mexican Plateau,and coastal western Mexico. ssc Not expected to occur; no suitable habitat.

Eumops perch'scalifornicus
western mastiff bat
Found in many open semi-arid to aridhabitats, including conifer and deciduouswoodlands, coastal scrub, grasslands,palm oases, chaparral, desert scrub, andurban areas. Typically forages in openareas with high cliffs and roosts in creviceson cliff faces and occasionally in manmade structures with at least 15 feet ofunobstructed space below roost. ssc Not expected to occur; no suitable habitat.

Nyctinomops macrotis
big free-tailed bat
Feeds primarily on moths caught whileflying over water sources in suitable habitatin the southwestern U.S. This migratoryspecies prefers rugged, rocky terrain androosts in crevices in high cliffs or rockyoutcrops. Uncommon in SouthernCalifornia. ssc Not expected to occur; no suitable habitat.

Z-epus californicus bennettii
San Diego black-tailed
jackrabbit
Occurs in herbaceous and desert-shrubareas and open, early stages afforest andchaparral habitats. ssc Not expected to occur; no suitable habitat.

E-15
Appendix E - Special Status Species Potentially Occurring in the Region TABLE E-2

SPECIAL STATUS WILDLIFE SPECIES REPORTED FROM THE PROJECT AREA Species General Habitat/Range Description USFWS CDFW
Critical
Habitat
Present in the
Study Area" Potential for Occurrence
Taxidea taxus
American badger
Most abundant in the drier open stages ofmost shrub, forest, and herbaceoushabitats, with friable soils. When inactive,occupies underground burrow. ssc Not expected to occur; no suitable habitat.

USFWS: U.S. Fish and Wildlife Service; CDFW: California Department of Fish and Wildlife; USFS: U.S. Forest Service; msl: mean sea levelStatus Definitions Federal (USFWS) StatusFE EndangeredFT ThreatenedFC Candidate State (CDFW) Status
SE EndangeredST ThreatenedSCE Candidate EndangeredSSC Species of Special ConcernFP California Fully Protected Notes: Scientific and common names for wildlife species follow the most current list of Special Animals (October 2023) available from the CDFW (https://www.wildlife.ca.gov/Data/CNDDB/Plants-and-Animals).

Critical Habitat only applies to USFWS-listed species. As such, any species without a USFWS listing, will have a"-".

E-16

APPENDIX B

MITIGATION MONITORING AND

REPORTING PROGRAM (MMRP)
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party

AIR QUALITY
RR AQ-1 Construction activities must be conducted in
compliance with the South Coast Air QualityManagement District's (SCAQMD's) Rule 403, Fugitive Dust, which requires the implementation ofbest available control measures (BACM) for any activity or man-made condition capable of
generating fugitive dust including, but not limited to, earth-moving activities, construction/ demolitionactivities, disturbed surface area, or heavy-and light-duty vehicular movement. The BACMs include
stabilizing soil; watering surface soils and crushed
materials; covering hauls or providing freeboard;
preventing track-out; and limiting vehicle speeds
and wind barriers, among others.

Duringconstruction
Contractor PWP
RR AQ-2 In accordance with the City's Climate Action Plan, construction equipment and vehicles are required to
limit idling times to no more than three consecutive
minutes.

Duringconstruction Contractor
PWP
BIOLOGICAL RESOURCESMM BIO-1 Prior to the start of construction of the Explorer Well portion of the Project, an exclusionary fence shallbe installed to prevent coastal whiptail from entering the work area. The fence shall be installed alongthe eastern edge of the project disturbance limits atthe Explorer Well, which is located at the toe of the vegetated slope. The exclusionary fencing shallconsist of silt fencing, buried six inches deep wherefeasible and installed with no gaps in the fencing.

Fencing shall be installed under the supervision of a
qualified Biologist to ensure that wildlife are not
impacted during installation of the fence.Exclusionary fencing shall be maintained throughout construction of the Explorer Well and
shall be removed upon completion of the Explorer
Well construction activities.

Prior to start ofconstruction
Contractor PWP
BIO-2 If feasible, project construction shall be conducted between September 16 and January 31, which is
outside the bird nesting season. Constructionconducted within this period shall be considered incompliance with the conditions set forth in the Migratory Bird Treaty Act (MBTA) and California
Fish and Game Code with methods approved by
the U.S. Fish and Wildlife Service (USFWS) andCalifornia Department of Fish and Wildlife (CDFW) to protect active bird and raptor nests. If the natureof the proposed construction activities requires thatwork be conducted during the breeding season for nesting birds (March 15-3eptember 15) or nestingraptors (February 1-June 30), to avoid direct impacts on active nests, a pre-construction surveyshall be conducted by a qualified Biologist for During thebreedingseason fornesting birds(March 15-September 15)and nestingraptors(February 1-June 30),surveys shalloccur within 3days prior toany Projectconstruction or PWP,Contractor

PWP/CDFW
B-1 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party
nesting birds and/or raptors within 3 days prior toany construction or disturbance activities (i.e.,within 300 feet for nesting birds and within 500 feetfor nesting raptors). If the Biologist does not findany active nests within or immediately adjacent tothe impact area, the construction work shall be allowed to proceed. If a lapse of more than three
days occurs between outdoor disturbance activities,the nesting bird survey will need to be repeated as nesting activities may potentially occur in that time
frame. Results of the surveys will be provided to the
City and to CDFW.

If the Biologist finds an active nest within orimmediately adjacent to the construction area and determines that the nest may be impacted or
breeding activities substantially disrupted, theBiologist shall delineate an appropriate buffer zone (at a minimum of 25 feet) around the nestdepending on the sensitivity of the species and the nature of the construction activity. Any nest found
during survey efforts shall be mapped on theconstruction plans. The active nest shall be protected until nesting activity has ended. Toprotect any nest site, the following restrictions to construction activities shall be required until nests
are no longer active, as determined by a qualified
Biologist: (1) clearing limits shall be establishedwithin a buffer around any occupied nest (the buffershall be 25-100 feet for nesting birds and 300-500feet for nesting raptors), unless otherwisedetermined by a qualified Biologist and (2) access and surveying shall be restricted within the buffer ofany occupied nest, unless otherwise determined bya qualified Biologist. Encroachment into the bufferarea around a known nest shall only be allowed if the Biologist determines that the proposed activity
would not disturb the nest occupants. Constructioncan proceed when the qualified Biologist hasdetermined that fledglings have left the nest, or the nest has failed.
disturbanceactivities
B-2 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party
CULTURAL RESOURCESRR CUL-1 If human remains are encountered during excavation activities, all work is required to halt in
the immediate vicinity of the discovery and the
County Coroner must be notified (California PublicResources Code Section 5097.98). The Coroner isrequired to determine whether the remains are of forensic interest. If the Coroner, with the aid of anarchaeologist, determines that the remains are prehistoric, they are required to contact the NativeAmerican hleritage Commission (NAHC). The NAHC is responsible for designating the most likely
descendant (MLD), who is responsible for the
ultimate disposition of the remains, as required bySection 7050.5 of the California Health and SafetyCode. The MLD is required to make theirrecommendation within 48 hours of being grantedaccess to the site. The MLD's recommendation isrequired to be followed, if determined by thelandowner to be feasible, and may include scientificremoval and non-destructive analysis of the human remains and any items associated with Native
American burials (California hlealth and Safety
Code Section 7050.5). If the landowner rejects theMLD's recommendations, at a minimum the landowner is required to rebury the remains with
appropriate dignity on the property in a location thatwill not be subject to further subsurface disturbance (California Public Resources Code Section
5097.98).

Duringexcavationactivities
County Coroner | PWP
CUL-1 Prior to commencement of earthmoving activities,
the City shall retain a qualified Archaeologist
meeting the Secretary of the Interior's Professional
Qualification Standards for Archaeology. TheArchaeologist shall be present at the pre-gradeconference; shall establish procedures forarchaeological resource surveillance; and shallestablish, in cooperation with the Contractor, procedures for temporarily halting or redirecting
work to permit the sampling, identification, andevaluation of the artifacts, as appropriate. At aminimum, in the event archaeological resources are exposed during construction activities, allconstruction work occurring within 100 feet of the find shall immediately stop until a qualifiedarchaeologist can evaluate the significance of thefind and determine whether additional study iswarranted. The Archaeologist shall first determine whether it is a "unique archaeological resource"
pursuant to the California Environmental Quality Act
(CEQA, i.e., Section 21083.2[g] of the California
Public Resources Code) or a "historical resource"
pursuant to Section 15064.5(a) of the State CEQA
Guidelines. If the archaeological resource is
Prior tocommencement ofearthmovingactivities
PWP,Contractor
PWP
B-3 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Pari:y
determined to be a "unique archaeologicalresource" or a "historical resource", the Archaeologist shall formulate a mitigation plan in
consultation with the City of Pasadena that satisfiesthe requirements of the above-referenced sections.The Archaeologist shall prepare a report of the results of any study prepared as part of a testing ormitigation plan, following guidelines of the CaliforniaOffice of Historic Preservation, and they shall record the site and submit the recordation form to
the City of Pasadena and the California Historic
Resources Information System (ChlRIS) at the
South-Central Coastal Information Center (SCCIC)at California State University, Fullerton. Work may proceed in other areas of the site, subject to the
direction of the Archaeologist.

GEOLOGY AND SOILSRR GEO-1 Grading, excavation, and construction is required to comply with the City's Building Code (Title 14 of the
Pasadena Municipal Code, which incorporates theCalifornia Building Code), as they relate to sitepreparation and construction; alteration; moving; demolition; repair; use and occupancy of buildings;
structures and building service equipment within the
City. The California Building Code requires the
preparation of engineering geologic reports,
supplemental ground-response reports, and/or
geotechnical reports for all new construction; new
structures on existing sites; and alterations toexisting buildings. It also includes seismic design criteria and requirements for use in the structuraldesign of buildings (i.e., based on seismic hazardmaps and the seismic design category) andspecifies building components that require specialseismic certification.

Prior tograding,excavation,andconstruction
PWP,Contractor
PWP
MM GEO-1 Prior to commencement of earthmoving activities, the City shall retain a qualified Paleontologist, foron-call services in the event of a discovery of paleontologically sensitive rock formations (i.e.,Quaternary older alluvial sediments) during ground disturbance activities. The Paleontologist shall be
present at the pre-grade conference; and shall
establish, in cooperation with the Contractor,procedures for temporarily halting or redirecting work to permit the sampling, identification, andevaluation of any discovered paleontological resources. Should these resources be found during
ground-disturbing activities for the Project, the
Paleontologist shall first determine whether it is asignificant paleontologically sensitive fossil locality or rock formation. If the above-mentioned resourcesare found during earthmoving activities, thePaleontologist shall formulate a report and a Prior tocommencement ofearthmovingactivities
PWP,Contractor
PWP
B-4 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party
mitigation plan in consultation with the City ofPasadena. For paleontological resources, the disposition of the resources shall be subject toapproval by the City. All recovered paleontologicallysensitive fossils and rock formations shall be deposited in an accredited institution or museum,such as the Natural hlistory Museum of Los AngelesCounty. If resources are discovered, work mayproceed in other areas of the Project site, subject to the direction of the Paleontologist.

HAZARDS AND HAZARDOUS MATERIALSRR HAZ-1 Construction activities are required to comply with existing federal, State, and local regulationsregarding hazardous material use, storage, disposal, and transport to prevent risks to public
health and safety, including but not limited toregulations set forth by the U.S. Environmental Protection Agency; U.S. Department of
Transportation (CFR Title 49, Hazardous Materials
Transportation Act; and Title 40 261.31, 261.21,
and 261.24); Comprehensive Environmental
Response, Compensation, and Liability Act
(CERCLA) (40 CFR parts 300, 311,355,370,and
373); Resource Conservation and Recovery Act
(RCRA) (40 CFR parts 240-299); Toxic Substances
Control Act (40 CFR parts 745, 761 and 763);
California Department of Toxic Substances Control(DTSC); California Department of Transportation(Caltrans); California Division of Drinking Water;and the California Occupational Safety and hlealth Administration (CalOSHA). All onsite generated
waste during both construction and operation that
meets hazardous waste criteria will be stored,manifested, transported, and disposed of in accordance with applicable regulations and in amanner to the satisfaction of the local CertifiedUnified Program Agency (CUPA).

Prior toconstruction
PWP,Contractor
PWP
HAZ-1 During the drilling of the Explorer Well, the drill cuttings and mud shall be placed directly into
California Department of Transportation-approvedsoil bins and the bins would be temporarily stored on site. Waste samples from these containers shall
be analyzed for the "medium-specific parameters"presented in the Sampling and Analysis Plan in NASA'S 2009 Final Remedial Design/Remedial
Action (RD/RA) Work Plan, prepared in accordancewith CERCLA requirements. Based on the laboratory results, the waste shall be classified ashazardous or non-hazardous and waste profilesand manifests for the waste shall be prepared. TheCity shall coordinate with NASA to ensure theselection of a U.S. Environmental Protection During thedrilling of thewell
Contractor PWP
B-5 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party
Agency (EPA)-certified waste disposal facility and a
licensed transporter to haul off the waste.

MM HAZ-2 During all earthmoving and construction activities, the City shall require the Contractors to implementthe following measures:

Trucks and equipment entering the site shall be
inspected to be free from oil, gasoline, or other
vehicle fluid leaks.

Equipment fueling areas shall be locatedoutside of the spreading basins and any jurisdictional waters as identified by the United
States Army Corps of Engineers (USAGE)andthe California Department of Fish and Wildlife (CDFW).

Any hazardous material spills and/or
contaminated soils shall be excavatedimmediately upon discovery and tested prior todisposal to ensure proper handling andtransport in compliance with applicable federal,state, and local regulations governing the handling of hazardous materials.

The Contractor shall maintain hazardous
materials spill control, containment, and
cleanup kits of adequate size and materials for
potential accidental spills and releases.

Duringearthmovingandconstructionactivities
Contractor PWP
HYDROLOGY AND WATER QUALITYRR HYD-1 The Explorer Well would be operated in compliance with Section 64560 of the California Code of
Regulations, which provides requirements
associated with installation of new drinking waterproduction wells and is administered by theCalifornia Division of Drinking Water (DDW). Thenew well must also comply with DDW-specifiedminimum horizontal distances to sanitary hazards.Additionally, the proposed well is required to comply with the community water system well requirements
in the California Department of Water Resources
Bulletins 74-81 and 74-90 and the American Water
Works Associated Standard A100-06 (Water Wells).

Duringoperation

PWP PWP
RR HYD-2 The Project is required to comply with the Statewide National Pollutant Discharge Elimination System
(NPDES) Permit for Drinking Water System
Discharges to Waters of the United States (Order
WQ 2014-0194-DWQ, General Order No.CAG14001).

Duringoperation
PWP,Contractor
PWP
B-6 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party
NOISERR N01-1 In accordance with Section 9.36.080 of the City of Pasadena Municipal Code, it is unlawful for any
person to operate any powered constructionequipment if the operation of such equipment emitsnoise at a level in excess of 85 dBA whenmeasured within a radius of 100 feet from such equipment.

Duringconstruction
PWP,Contractor
PWP
N01-1 The Construction Contractor shall implement the
following noise reduction measures during allconstruction activities:
a. All stationary or mobile construction
equipment shall be equipped with properlyoperating and maintained mufflers andengine enclosures, compliant with orexceeding manufacturers' standards. b. All construction equipment engine enclosures
and covers, as provided by manufacturers,shall be in place during construction activities. c. All construction equipment shall be shut down
when not in use. Construction equipment
shall not be allowed to idle for more than 3minutes.
d. During Project construction, export of drill
cuttings via trucks shall be limited to the
hours of 7 AM through 7 PM.
e. For nighttime activities, construction-standard
high-pitch backup alarms for constructionequipment and vehicles shall not be used during construction of the Project.Construction equipment and vehicles shall use low-impact backup alarms, including, but
not limited to, the following: manually
adjustable alarms, self-adjusting alarms, and
broadband (white noise) alarms. These
alarms shall conform to the safety
requirements established by the Occupational
Safety and Health Administration (OSHA).

Duringconstructionactivities
Contractor PWP
MM N01-2 During nighttime construction activity (i.e., from 7 PM to 7 AM), the Construction Contractor shall
ensure that the following best management
practices for sound barriers are implemented:
a. Sound barrier enclosures of a minimum
height of 12 feet shall enclose all stationaryequipment sources of noise on four sides.These enclosures shall be constructed ofeither %-inch plywood or greater thickness orsound blankets with a minimum STC rating of 25 and cover all sides as well as the top of
the equipment. Minimal gaps in the enclosure
Duringconstructionactivities
Contractor PWP
B-7 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party
are acceptable to ensure adequate air intake,exhaust ventilation, and heat dissipation for proper equipment functioning.
b. Temporary sediment settling tanks (i.e.,
Baker tanks) shall be strategically placed
between the circulation tank motor and thenearest residential use.

MM N01-3 Prior to commencement of nighttime Project
construction, the City of Pasadena shall establish adesignated phone hotline and email address for Project-related information and complaints from thesurrounding neighborhood. The City shall designatea Noise Complaint Manager to monitor this phonehotline and email. Fliers or posters must be posted and visible at the Project boundary at least oneweek prior to commencement of nighttimeconstruction activity and continue throughout thenighttime construction duration. These posters must provide the following information: nighttimeconstruction duration and other related details andcontact information for the phone hotline and emailaddress.

Prior to andduringconstructionactivities

PWP PWP
MM N01-4 Prior to commencement of nighttime construction activities, the City shall retain a Noise Monitor tomonitor noise levels during nighttime construction activities (i.e., from 7 PM to 7 AM). The Noise
Monitor shall monitor and record noise at the
property line for the nearest residential uses (westand east of the Project site) to ensure that noise levels from the Project construction site do not
exceed 50 A-weighted decibels (dBA) at night. If
Project-related noise levels exceed 50 dBA duringnighttime activities, additional noise reductionmeasures shall be implemented to further reduce construction noise at the Project site to a level at or below 50 dBA, such as additional vertical andhorizontal sound barriers.

Prior to andduringconstructionactivities
PWP,Contractor
PWP
MM N01-5 Once the Project is operational, the City of
Pasadena shall conduct a post-construction noisesurvey to ensure the operation of the well equipment is compliant with the City's noiseordinances.

Duringoperation

PWP PWP
PUBLIC SERVICESRR PS-1 The Project shall be designed and constructed in accordance with the Pasadena Fire Prevention
Code (Chapter 14.28 of the City's Municipal Code),
which adopts the California Fire Code with changes
and additions to the adopted code.

During designphase

PWP PWP
B-8 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party

TRANSPORTATION
RR TRA-1 Construction activities will be conducted in
accordance with the Standard Specifications forPublic Works Construction (Greenback) and the City's Supplements and Modifications to the
Greenbook to maintain access to all parcels in andnear the construction sites. This includesnotification of residents and businesses affected by the road work; utility agencies with facilities in thearea; the Pasadena Fire and Police Departments;and other emergency service providers. The Greenbook also requires that access be made
available at the end of each workday.

Duringconstructionactivities
Contractor PWP
RR TRA-2 Temporary traffic control devices and methods used during construction are required to conform to therequirements of the latest edition of the Manual onUniform Traffic Control Devices (MUTCD) and theCalifornia Supplement to the MUTCD. Thecontractor shall provide traffic tapers, traffic control devices, barricading, and signs necessary to ensuredriver awareness and safety in construction areasand to assist fire and law enforcement personnel.

Duringconstructionactivities
Contractor PWP
TRIBAL CULTURAL RESOURCESMM TCR-1 Prior to commencement of ground-disturbing activities, the City of Pasadena (City) shall retain aNative American Monitor (NAM) culturally affiliated with the geographic area of the proposed project as
recognized by the Native American HeritageCommission (NAHC) and/or a recognized scientific entity such as the South Central Coastal
Information Center or the California State Office of
Historic Preservation to obsen/e ground-disturbingactivities, which may include, but are not limited to,pavement removal, pot-holing or auguring, grubbing, tree removals, boring, grading,excavation, drilling, and trenching, within the Project Area. Additionally, per MM CUL-1, prior tocommencement of ground-disturbing activities, theCity shall retain a qualified Archaeologist for on-callservices in the event of discovery of culturalresources. Monitoring by the NAM is only to occur onsite when well drilling is scheduled within 50 feetbelow the ground surface (bgs) and is not to exceed five consecutive working days. The NAM shall
complete daily monitoring logs providing
descriptions of the day's activities including
construction activities, locations, soil, and anycultural materials identified. All discovered TCRsfound during ground-disturbing activities for the Project within 50 feet below ground surface, shallbe temporarily curated in a secure location on siteby the Project Archaeologist. If removal of artifacts from the Project site is necessary, each artifact
Prior togrounddisturbingactivities
PWP,Contractor
PWP
B-9 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party
shall be catalogued, and an inventory will be
provided to the Tribal monitor upon each addition.Following the completion of the Project, all TCRsshall be returned to the Tribe. Regardless of discovery, at the completion of all ground-disturbingactivities, the Project Archaeologist shall formulatea Monitoring Report and submit said report to theCity of Pasadena and the South-Central Coastal Information Center (SCCIC) located at CaliforniaState University, Fullerton and the Gabrieleno Band of Mission Indians-Kizh Nation Tribal Government.The report will document all monitoring efforts and the NAM and be completed within 60 days of
conclusion of all ground-disturbing activities. The
disposition of the resources shall be subject to
approval by the City. If resources are discovered,
work may proceed in other areas of the site, subjectto the direction of the Archaeologist or NAM.

MM TCR-2 Upon discovery of any Tribal Cultural Resources, all construction activities shall cease in the immediatevicinity of the discovery (not less than thesurrounding 50 feet) and shall not resume until the find can be assessed. All Tribal Cultural Resources
unearthed by project activities shall be evaluated by
the tribal monitor and a qualified archaeologist. Ifthe resources are Native American in origin, the consulting tribe will retain it/them in the form and/or manner the tribe deems appropriate, foreducational, cultural, and/or historic purposes.

Duringconstructionactivities
PWP,Contractor
PWP
MM TCR-3 If human remains and/or grave goods are
discovered or recognized at the project sites, all
ground disturbance shall immediately cease, andthe county coroner shall be notified per PublicResources Code Section 5097.98, and Health & Safety Code Section 7050.5. Human remains and
grave/burial goods shall be treated alike perCalifornia Public Resources Code section5097.98(d)(1) and (2). Work may continue in other parts of the project sites while evaluation and, ifnecessary, mitigation takes place (CEQAGuidelines Section 15064.5[f|). Presen/ation in place (i.e., avoidance) is the preferred manner of
treatment for human remains and/or burial goods. If
preservation in place is not feasible, treatment mayinclude implementation of archaeological datarecovery excavations to remove the resource along with subsequent laboratory processing and
analysis. Any discovery of human remains/burial
goods that are Native American in origin shall be
kept confidential to prevent further disturbance.

Any historic archaeological material that is notNative American in origin (non-TCR) shall be curated at a public, non-profit institution with a
research interest in the materials, such as the
Duringconstructionactivities
County Coroner | PWP
B-10 Mitigation Monitoring and Reporting Program
Explorer Well Project
Final IS/MND
Mitigation Measures Timing
Implementing
Party
Monitoring
Party
Natural History Museum of Los Angeles County or
the Fowler Museum, if such an institution agrees to
accept the material. If no institution accepts thearchaeological material, it shall be offered to a localschool or historical society in the area for educational purposes.

UTILITIES AND SERVICE SYSTEMSRR UTIL-1 The Contractor is required to comply with the City's Construction and Demolition Waste Management
Ordinance (Chapter 8.62 of the Pasadena
Municipal Code), which requires preparation andimplementation of a Waste Management Plan that shows how at least 75 percent of construction anddemolition debris would be diverted away fromlandfills. The Waste Management Plan is subject toCity approval prior to the start of constructionactivities, and the Contractor shall provide monthly reports to demonstrate compliance during the
construction phase.

Duringdemolition andconstruction
Contractor PWP
Source: Psomas 2023.

B-11 Mitigation Monitoring and Reporting Program