Cities Index.
AR 1 ATTACHMENT A - Pasadena SSMP Update 2025_FINAL

Pasadena City Council
June 2, 2025

Document
AR 1 ATTACHMENT A - Pasadena SSMP Update 2025_FINAL
Meeting
June 2, 2025
Body
Pasadena City Council
Pages
1
Original file
29.9 MB
Text extracted from the city's file for reading and search. Open the original on ww2.cityofpasadena.net. That file is the official record.

City of Pasadena
Sewer System Management Plan
California State Resources Control Board
Prepared for:

City of Pasadena Public Works Department
100 N. Garfield Ave, Room N306
Pasadena, California 91101
Contact: James Tong, P.E.

May 2025
Attachment A

INTENTIONALLY LEFT BLANK
City of Pasadena Sewer System Management Plan Page i
Table of Contents

SECTIONS
City of Pasadena .................................................................................................................................................................................. i Sewer System Management Plan ..................................................................................................................................................... i Table of Contents ................................................................................................................................................................................. i Acronyms and Abbreviations ............................................................................................................................................................ iii Definitions ............................................................................................................................................................................................ v Purpose and Background ................................................................................................................................................................. ix Elements of a SSMP .......................................................................................................................................................................... xi 1 SSMP Goal and Introduction ......................................................................................................................................................1 2 Organization .................................................................................................................................................................................5 3 Legal Authority .......................................................................................................................................................................... 15 4 Operation and Maintenance Program .................................................................................................................................. 21 5 Design and Performance Provisions ...................................................................................................................................... 25 6 Spill Emergency Response Plan ............................................................................................................................................. 27 7 Sewer Pipe Blockage Control Program ................................................................................................................................. 43 8 System Evaluation, Capacity Assurance, and Capital Improvements .................................................................................... 47 9 Monitoring, Measurement and Program Modifications ...................................................................................................... 51 10 Internal Audits ........................................................................................................................................................................... 57 11 Communication Program......................................................................................................................................................... 59 Appendix A......................................................................................................................................................................................... 61 The Reissued WDR: Order Number WQ 2022-0103-DWQ ................................................................................................. 61 Appendix B ........................................................................................................................................................................................ 63 Public Works Department Organizational Charts................................................................................................................. 63 Appendix C ........................................................................................................................................................................................ 65 Charter Chapter 8.14 (Grease and Oil Disposal Ordinance) of the Municipal Code....................................................... 65 Appendix D ........................................................................................................................................................................................ 67 Charter Chapter 13.24 (Sewer Construction and Maintenance) of the City Municipal Code ........................................ 67 Appendix E ........................................................................................................................................................................................ 69 Updated Sewer Collection System Map ................................................................................................................................ 69 Appendix F ......................................................................................................................................................................................... 72 Spill Emergency Response Plan ............................................................................................................................................. 73 Appendix G ........................................................................................................................................................................................ 75 Notification Requirements ...................................................................................................................................................... 75 Appendix H ........................................................................................................................................................................................ 79 Reporting Requirements ......................................................................................................................................................... 79 Appendix I .......................................................................................................................................................................................... 91 Table of Contents
City of Pasadena Sewer System Management Plan Page ii
Sewer Pipe Blockage Control Program Supporting Documentation ................................................................................. 91 Appendix J ......................................................................................................................................................................................... 93 Sewer System Management Plan Change Log .................................................................................................................... 93 Appendix K ........................................................................................................................................................................................ 97 SSMP Monitoring Parameters ................................................................................................................................................ 97 TABLES
1-1 SSMP Update Schedule ......................................................................................................................................................2 1-2 Sewer System Assets ..........................................................................................................................................................3 1-3 Number of Service Connections ........................................................................................................................................3 2-1 Key Staff Roles .....................................................................................................................................................................9 2-2 Department Roles & Responsibilities ...............................................................................................................................9 2-3 Positions that Implement the City’s SSMP .................................................................................................................... 11 2-4 Contact Numbers for Chain of Communication ............................................................................................................ 13 3-1 WDR Requirements .......................................................................................................................................................... 16 4-1 Equipment and Replacement Parts Inventory .............................................................................................................. 24 6-1 Spill Category 1: Spills to Surface Waters ...................................................................................................................... 33 6-2 Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters ........................... 34 6-3 Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters ........................................................................................................................................... 35 6-4 Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters ...................................... 36 6-5 City Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters .......................................... 37 9-1 SSMP Update Schedule ................................................................................................................................................... 51 9-2 SSMP Monitoring Parameters, by SSMP Element ....................................................................................................... 52 9-3 Preventive Operation and Maintenance Activities to Track ........................................................................................ 55 9-4 Spill Trends from 2014 to 2024 ..................................................................................................................................... 55

FIGURES
2-1 Organizational Chart ............................................................................................................................................................7 2-2 Spill Response Chain of Communication ...................................................................................................................... 12 City of Pasadena Sewer System Management Plan Page iii
Acronyms and Abbreviations
Abbreviation Acronym
BMP Best Management Practices
CCTV Closed-Circuit Television
CIP Capital Improvement Program or cast iron pipe
City City of Pasadena
CIWQS California Integrated Water Quality System
CPC California Plumbing Code
CSC City Service Center
CWEA California Water Environment Association
DIP Ductile Iron Pipe
DPD Department of Planning and Development
DPW Department of Public Works
FOG Fats, Oils, & Grease
GIS Geographic Information System
GPS Global Positioning System
Greenbook Standard Publication for Public Works and Standard Plans for Public Works I&I Inflow & Infiltration
LACFCD Los Angeles County Flood Control District
LACSD Los Angeles County Sanitation District
LRO Legally Responsible Official
NPDES National Pollutant Discharge Elimination System
O&M Operation and Maintenance
OES Office of Emergency Services (aka Cal OES)
Order SWRCB Order No. 2022-0103-DWQ adopted December 6, 2022 and effective June 5, 2023
RRR Resource, Recovery & Recycling
RWQCB Regional Water Quality Control Board
SCADA Supervisory Control and Data Acquisition
SERP Spill Emergency Response Plan
SSMP Sewer System Management Plan
SSO Sanitary Sewer Overflow
SWRCB State Water Resources Control Board
VCP Vitrified Clay Pipe
WDID Waste Discharge Identification Number
WDR Waste Discharge Requirements, also referred to as the Sanitary Sewer Systems Waste Discharge Requirements (SSSWDR)
Acronyms and Abbreviations
City of Pasadena Sewer System Management Plan Page iv

INTENTIONALLY LEFT BLANK
City of Pasadena Sewer System Management Plan Page v
Definitions
Annual Report - A mandatory report in which the Enrollee provides a calendar-year update of its efforts to prevent spills.

California Integrated Water Quality System (CIWQS) - The statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.

Data Submitter - An individual designated and authorized by the Enrollee’s Legally Responsible Official (LRO) to enter spill data into the online CIWQS Sanitary Sewer System Database. Data Submitters do not have the authority of an LRO to certify reports within the CIWQS Sanitary Sewer System Database.

Enrollee - A public, private, or other non -governmental entity that has obtained approval for regulatory coverage under the General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
o greater than one (1) mile in length (each individual sanitary sewer system); o one mile or less in length where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under the Order, or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under the Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

Exfiltration - The underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.

Governing Entity - A governing entity includes but is not limited to the following:
• A publicly elected governing board, council, or commission of a municipal agency; • A Department or Division director of a federal or state agency that is not governed by a board; • A governing board or commission of an organization or association; and • A private system owner/manager that is not governed by a board.

Lateral (including Lower and Upper Lateral) - An underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the Enrollee’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership. A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations. An upper lateral is the portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.

Legally Responsible Official - An official representative, designated by the Enrollee, with authority to sign and certify submitted information and documents required by the General Order.

Definitions
City of Pasadena Sewer System Management Plan Page vi
Nuisance - California Water Code Section 13050, subdivision (m), defines nuisance as anything which meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property. • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal. • Occurs during, or as a result of, the treatment or disposal of wastes.

Potential to Discharge, Potential Discharge - Any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.

Receiving Water - A water of the State that receives a discharge of waste.

Sanitary sewer system - A system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

For purpose of the Order, sanitary sewer systems include only systems owned and/or operated by the Enrollee.

Satellite Sewer System - A portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.

Sewer System Management Plan - A living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with the General Order.

Sewage - Sewage and its associated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Spill - A discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under the General Order if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.

Spill Reporting System – Online spill reporting system that is hosted, controlled, and maintained by the State Water Board. The web address for this site is http://ciwqs.waterboards.ca.gov. This online database is maintained on a secure site and is controlled by unique usernames and passwords.

Training - In-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with the General Order.

Untreated or partially treated wastewater – Any volume of waste discharged from the sanitary sewer system upstream of a wastewater treatment plant headworks.

Definitions
City of Pasadena Sewer System Management Plan Page vii Waste - As defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processin g operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal.

Waste Discharge Identification Number (WDID) – Number which identifies each individual sanitary sewer system enrolled under the General Order. A WDID number is assigned to each enrolled system upon an Enrollee’s approved regulatory coverage.

Waters of the State - Surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions. Waters of the State include waters of the United States.

Waters of the United States - Surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.

Water Quality Objective - The limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance.

WDR – State Water Resources Control Board (SWRCB) Order No. 202 2.0103-DWQ, known as the WASTE DISCHARGE REQUIREMENTS (WDR), which was adopted December 2, 2022 and became effective on June 5, 2023.

Definitions
City of Pasadena Sewer System Management Plan Page viii

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page ix
Purpose and Background
In December 2022, the State of California’s Water Resources Control Board (SWRCB) adopted Order Number WQ 2022-0103-DWQ that updated General WDRs for sanitary sewer systems designed to convey sewage greater than one (1) mile in length . The order became effective on June 5, 2023. This order supersedes the previous Order Number 2006-0003-DWQ and all amendments thereafter (i.e., Order No. WQ 2013-0058-EXEC). The WDR requires that all enrolled agencies develop a Sewer System Management Plan (SSMP) that describes the activities of the enrollee in managing, operating, and maintaining their sanitary sewer collection system. The purpose of the Order is to prevent sanitary sewer spills and to provide a plan and schedule for measures to be implemented for spill prevention including measures to effectively clean up and report spills. A copy of the reissued 2022 WDR is included in Appendix A.

The reissued WDR includes directives for owners and operators of sanitary sewer systems to demonstrate adequate and efficient management, operation, and maintenance of the sanitary sewer system. Generally, the WDR requires that:

In the event of a spill, all feasible steps are taken to control the released volume and prevent untreated wastewater from entering storm drains, creeks, etc.

If a spill occurs, it must be reported to the SWRCB using California Integrated Water Quality System (CIWQS), the online reporting system developed by the SWRCB.

An SSMP with all mandatory elements be developed and approved by the governing body that owns or is responsible for the operation of the sanitary sewer system. The SSMP must include provisions to provide proper and efficient management, operation, and maintenance of the sanitary sewer system.

Spills often contain high levels of suspended solids, pathogenic organisms, toxic pollutants, nutrients, oxygen - demanding organic compounds, oil and grease and other pollutants. Spills may cause a public nuisance and/or a public health hazard particularly when raw untreated wastewater is discharged to areas with high public exposure, such as streets or surface waters used for drinking, fishing, or body contact recreation. Spills may pollute surface or ground waters, threaten public health, adversely affect aquatic life, and impair the recreational use and aesthetic enjoyment of surface waters.

Sanitary sewer systems experience periodic failures resulting in discharges that may affect waters of the state.

There are many factors (including factors related to geology, design, construction methods and materials, age of the system, population growth, and system operation and maintenance), or excessive infiltration and inflow (I/I) which affect the likelihood of a spill. A proactive approach that requires agencies to ensure a system-wide operation, maintenance, and management plan is in place that will reduce the number and frequency of spills within the state.

This approach will in turn decrease the risk to human health and the environment caused by spills.

Purpose and Background
City of Pasadena Sewer System Management Plan Page x

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page xi
Elements of a SSMP
A Sewer System Management Plan (SSMP) is a living planning document that documents ongoing local sewer system management program activities, procedures, and decision-making – at the scale necessary to address the size and complexity of the subject sanitary sewer system(s). This SSMP may incorporate other programs and other plans by reference, to address short-term and long-term system resilience through:
• Proactive planning and decision-making;
• Local government ordinances;
• Updated operations and maintenance activities and procedures; • Implementation of capital improvements;
• Sufficient local budget to support staff resources, contractors, equipment, and training; and • Updated training of staff and contractors.

The Enrollee’s development, update, and implementation of a SSMP addressing the pertinent requirements is an enforceable component of the General Order. As specified in the General Order, consistent with the Water Code and the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts in implementing an effective SSMP to prevent, contain, control, and mitigate sp ills when considering Water Code section 13327 factors to determine necessary enforcement of the General Order.

The eleven (11) required SSMP Elements that must be included in an SSMP are as follows:

1. Sewer System Management Plan Goal and Introduction

2. Organization

3. Legal Authority

4. Operations and Maintenance Program

5. Design and Performance Provisions

6. Spill Emergency Response Plan

7. Sewer Pipe Blockage Control Plan

8. System Evaluation, Capacity Assurance, and Capital Improvements

9. Monitoring, Measurement and Program Modifications

10. Internal Audits

11. Communication Program

Elements of a SSMP
City of Pasadena Sewer System Management Plan Page xii

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 1
1 SSMP Goal and Introduction
This Sewer System Management Plan (SSMP) has been prepared in compliance with the requirements of the State Water Resources Control Board ’s Order Number WQ 2022-0103-DWQ. This chapter includes a summary of the regulations that serve as the impetus for the development of this SSMP, update schedule for the City of Pasadena’s (City) SSMP, and a brief overview of the City’s service area and sanitary sewer system.

Requirements:

D.1. SEWER SYSTEM MANAGEMENT PLAN GOAL AND INTRODUCTION: The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur. The Plan must include a narrative Introduction section that discusses the following items:

1.1. Regulatory Context: The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.

1.2. Sewer System Management Plan Update Schedule: The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.

1.3. Sewer System Asset Overview: The Plan Introduction section must provide a description of the Enrollee - owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons;
• Structures diverting stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and • Unique service boundary conditions and challenge(s).

Additionally, the Plan Introduction section must provide reference to the Enrollee’s up -to-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of the General Order’s Attachment D.

Element 1: SSMP Goal & Introduction

City of Pasadena Sewer System Management Plan Page 2

1.1 Regulatory Context
The City has implemented this SSMP in accordance with the requirements of the State Water Resources Control Board’s General Order. The City’s last SSMP was written and adopted by the City Council in 2019. The City plans to obtain approval of this SSMP Update by the City Council in 2025. The SSMP has been audited in 2024 in compliance with the State Water Resources Control Board’s regulations.

The WDR requires that the SSMP be updated and approved by the agency’s elected governing body every six (6) years after the date of its last Plan Update due date. In addition, the City is to conduct an internal audit every three (3) years of the SSMP in or der to assess the City’s progress towards meeting the goals, objectives and requirements set forth in the SSMP. The due dates for the City’s SSMP and SSMP audits can be found here using the City’s WDID (4SSO10416): https://www.waterboards.ca.gov/water_issues/programs/sso/lookup/.

The SSMP along with all references in the document, self -audits, and the adoption documents approved by City Council will be kept on file at City offices, the City’s website and an entry will be made in the California Integrated Water Quality System (CIWQS) database when SSMP updates and audits are completed.

The City has a goal of effectively implementing the SSMP to ensure cleaning , CCTV inspection, condition assessment, and rehabilitation are occurring regularly to ensure their sewer system is properly maintained.

1.2 Sewer System Management Plan Update Schedule
Table 1-1 shows important milestones and dates for the City to comply with the General Order in order to incorporate activities that shall prevent sewer spills.

Table 1-1: SSMP Update Schedule
Milestones Frequency Due DATES
Submit Annual Report Annually April 1st annually
Update System Mapping Monthly 3/1/2025, 4/1/2025, etc.

System Cleaning Entire system every year 1/1/2026 for entire system CCTV Inspections Entire system seven (7) years (or
~14% a year)
1/1/2032 for entire system
SSMP Focused Training Twice a year 1/1/2026 & 7/1/2026
Update Equipment Inventory Monthly 3/1/2025, 4/1/2025,
5/1/2025, 6/1/2025, etc.

Evaluate Design Criteria and
Construction Standards and
Specifications
3 years 5/2/2027 (next audit)
Evaluate Spill Emergency Response
Plan
3 years 5/2/2027 (next audit)
Evaluate Sewer Pipe Blockage
Control Program
3 years 5/2/2027 (next audit)
CIP Development 5 years 7/1/2026
Review SSMP and Update Change
Log
Annually 5/2/2026
SSMP Audit 3 years 5/2/2027
Evaluate Communication Program 3 years 5/2/2027 (next audit) SSMP Update 6 years 5/2/2031
Element 1: SSMP Goal & Introduction
City of Pasadena Sewer System Management Plan Page 3

1.3 Sewer System Asset Overview
The City of Pasadena (City) is located in Los Angeles County in the San Gabriel Valley and is approximately 10 miles northeast of downtown Los Angeles in Southern California. The City is accessible via Interstates 110 and 210 as well as State Highway 134. The City’s area is approximately 23.1 square miles. The City’s population is approximately 139,000.

The City of Pasadena owns and operates the sanitary sewer collection system within its service area . The City provides sewer service to most businesses and residents within the City . Table 1-2 documents the City’s sewer system assets, and Table 1-3 documents the number of service connections which connect into the City’s sewer system. General maintenance of the sanitary sewer collection system is performed by City staff.

The City maintains up-to-date mapping of its sanitary sewer system and storm drain system in its iMap database and plans on developing a system to keep their GIS maps up-to-date. These maps show gravity line segments and manholes, pumping facilities, pressure pipes , and applicable stormwater conveyance facilities within the sewer system service area boundaries. Additional information on these maps is included in section 4.1 (Updated Map of Sanitary Sewer System).

Table 1-2: Sewer System Assets
City Assets Value
Total Length 328.2 miles
Length of Gravity Mainlines 328 miles
Length of Pressure Force Mains 940 feet
Number of Lift Stations 3 (City-owned), 7 (privately owned) Number of Siphons 10
Structures Diverting Stormwater to the Sewer System NONE Data Management Systems Lucity
GIS

AUTOCAD
Sewer System Ownership and Operation
Responsibilities between Enrollee and Private Entities
for Upper and Lower Sewer Laterals
Enrollee is responsible for City-owned laterals.

Property owner is responsible for the lateral up to
the connection to the sewer main.

Estimated Number or Percent of Residential,
Commercial, and Industrial Service Connections
See Table 1-3
Unique Service Boundary Conditions and Challenge(s) City Limits Table 1-3: Number of Service Connections
Customer Class Service Connections
Single Family Residential 22,591
Multi-Family Residential 7,858
Commercial/Institutional 8,510
Industrial 1,122
Total Active Connections 40,081
Element 1: SSMP Goal & Introduction
City of Pasadena Sewer System Management Plan Page 4

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 5
2 Organization
This chapter describes the City’s organizational staffing responsible and integral for implementing the local Sewer System Management Plan.

Requirements:

D.2. ORGANIZATION: The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of the General Order;
• The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county health officer, county environmental health agency, and State Office of Emergency Services.)

2.1 Name of Legally Responsible Official
The City’s Assistant City Engineer serves as the City’s Legally Responsible Official (LRO) and oversees the management of the City’s sanitary sewer system. Currently, the LRO is Brent Maue which is the City’s acting City Engineer. His contact information is ( 626) 744-4307 (office) and [email protected]. In 2025, the City plans to designate the Public Works Administrator as the backup LRO.

Currently, only the LRO is authorized to certify electronic spill reports submitted to the SWRCB. Typically, the City Engineer/LRO will certify all electronic reports.

The Engineering department and the Streets and Maintenance staff are responsible for implementing and maintaining all elements of this SSMP.

2.2 Department Organization
The organizational lines of authority for the City’s Department of Public Works are indicated in Figure 2-1. Detailed organizational charts for each division are provided in Appendix B.

Element 2: Organization
City of Pasadena Sewer System Management Plan Page 6

INTENTIONALLY LEFT BLANK
Element 2: Organization

City of Pasadena Sewer System Management Plan Page 7
Figure 2-1: Organizational Chart

Element 2: Organization
City of Pasadena Sewer System Management Plan Page 8

INTENTIONALLY LEFT BLANK
Element 2: Organization

City of Pasadena Sewer System Management Plan Page 9

2.3 Roles and Responsibilities
The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements are indicated in Table 2-1. The responsibilities for these roles are detailed in Table 2 -2. The positions that implement the SSMP are detailed in Table 2-3.

Table 2-1: Key Staff Roles
Role Name Phone Number Email Address
Public Works Superintendent
(Street Maintenance)
Jeffrey Wong 626- 744-4808 [email protected] Administrative
Public Works Administrator
(Street Maintenance)
Garret Crawford 626-744-3883 [email protected] Public Works Administrator
(Administrative Services
Division and CSC)
Phyllis Hallowell 626-744-3952 [email protected] Public Information Officer Lisa Derderian 626-744-4755 [email protected] Deputy City Attorney Caroline Monroy 626-744-4143 [email protected] Public Works Administrator
Resource, Recovery &
Recycling (RRR)
Thanos Gauthier 626-744-6472 [email protected] Engineering
Acting City Engineer (LRO) Brent Maue 626-744-4307 [email protected] Acting Assistant City Engineer Richard Yee 626-744-4643 [email protected] Principal Engineer James Tong 626-744-3971 [email protected] Associate Engineer Janina Lyka Baiza 626-744-3703 [email protected] Street Maintenance
Public Works Administrator
(Street Maintenance)
Garrett Crawford 626-744-3883 [email protected] Public Works Crew
Supervisor II (Sewer
Maintenance & Storm Drains)
Anthony Merjil 626-744-4161 [email protected]

Table 2-2: Department Roles & Responsibilities
Role Responsibilities
Public Works Administrator (Street
Maintenance Division)
Under administrative direction plan, assign, direct and review through subordinate supervisors the work of staff performing preventive and corrective maintenance tasks including installation, maintenance and repair of streets, curbs, gutters, sidewalks; street painting and signing; streetlight and traffic signal repair; storm drain and sewer collection system maintenance; and street sweeping. Coordinate stand-by emergency response and/or respond to emergencies. Make regular field checks of crews in operation. Assist in the development of specifications for street maintenance and repair equipment. Work with elected officials, executive management, and the general public, as well as with federal, state, regional and other local agencies, Element 2: Organization
City of Pasadena Sewer System Management Plan Page 10
Table 2-2: Department Roles & Responsibilities
Role Responsibilities
departments, boards and commissions on street system, sewer and storm drain infrastructure maintenance.

City Engineer Under administrative direction, plans, directs, and coordinates engineering activities relating to City public works engineering projects and capital improvement projects; provides supervision and technical direction to professional and non-professional staff; performs related work as assigned.

Assistant City Engineer Under administrative direction, plans, directs, and coordinates engineering activities related to City public works engineering projects and capital improvement projects; performs related work as assigned.

Principal Engineer Under general direction, plans, directs and supervises a section of professional and para-professional engineering teams engaged in the application of engineering to a variety of projects and programs; conceptualizes, develops, designs and implements all phases of difficult design and engineering research projects; performs related work as assigned.

Associate Engineer Under general supervision, performs a variety of professional engineering work in the field or office; coordinates, assigns and oversees the work of professional and technical staff in engineering activities; performs related work as assigned.

Administration
Public Works Administrator
(Administrative Services Division and
CSC)
Under supervision, performs analytical, administrative and/or management duties and responsibilities in various administrative staff functions including budget/financial analysis,
program/organizational analysis, project management, legislative analysis and development, personnel administration, space management, asset control and contract administration; performs related work as assigned.

Public Works Administrator (Resource
Recovery & Recycling [RRR])
Under administrative direction manages the City's refuse collection and disposal, and recycling collection programs; ensure effective and efficient service at controlled costs.

Plan, assign, direct and review through subordinate supervisors, the work of refuse collection crews working on assigned routes; re-route and/or develop and implement new collection routes as needed.

Manage contracts and administer solid waste franchise agreements to ensure standards/specifications are met; oversee contract work activities. Administer the A.B. 939 public education program and meet solid waste mandated legislative requirements. Develop and integrate new programs into existing operations on an ongoing basis. Prepare grant applications; administer grants ensuring compliance with grant terms and conditions. Coordinate the timely repair, maintenance, and procurement of equipment. Assist in the development of
specifications for integrated waste equipment. Supervise the inspection of work crews while in progress; provide advice and assistance to subordinate supervisors. Regularly make field checks of crews in operation.

Public Information Officer Under general direction, oversees, develops and coordinates the public affairs program of the City. Advises management in public information/relations activities and performs related work as assigned.

Element 2: Organization

City of Pasadena Sewer System Management Plan Page 11
Table 2-2: Department Roles & Responsibilities
Role Responsibilities
Deputy City Attorney Under general supervision, performs a wide variety of professional legal duties, ranging in difficulty from moderate to complex, for all municipal departments, the City Council and advisory boards and commis­sions; prosecutes criminal misdemeanor cases; and performs related duties as assigned in either the Civil or Prosecution Division of the City Attorney/City Prosecutor’s Office.

Street Maintenance
Street Maintenance Superintendent
(Sewer Maintenance & Storm Drains)
Under general direction, manages, directs and organizes one or more maintenance sections in the Department of Public Works; provides day-to-day management of the section, including the preparation of fiscal, administrative and operational reports and recommendations; performs other related duties as required.

Public Works Crew Supervisor II
(Sewer Maintenance & Storm Drains)
Under general supervision, supervises the maintenance and repair of the City's streets, storm drains, sewers, graffiti and weed abatement, street painting, street signs; street sweeping; parks, park facilities, trees, trails, and landscaping, and irrigation systems maintenance; refuse collection and disposal; maintenance, repair, alteration and construction work to City facilities; maintenance and repair of Arroyo Seco and Rose Bowl; performs related work as assigned.

Table 2-3: Positions that Implement the City’s SSMP
SSMP Element [WDR Section No.] Position(s)
Legally Responsible Official (LRO) or
Duly Authorized Representative
[Section 5.1]
Assistant City Engineer
Goals
[SSSWDR D.1]
Principal Engineer
Organization
[SSSWDR D.2]
City Engineer
Legal Authority
[SSSWDR D.3]
Deputy City Attorney
Operation and Maintenance Program
[SSSWDR D.4]
Streets Maintenance Superintendent
Design and Performance Provisions
[SSSWDR D.5]
Principal Engineer
Spill Emergency Response Program
[SSSWDR D.6]
Public Works Administrator (Streets/Sewer) / Principal Engineer Sewer Pipe Blockage Control Program
[SSSWDR D.7]
Public Works Administrator (Streets/Sewer) / Stormwater Program Administrator/Public Works Administrator (Resource Recovery & Recycling (RRR))
System Evaluation, Capacity
Assurance and Capital Improvements
[SSSWDR D.8]
Principal Engineer
Monitoring, Measurement, and
Program Modifications
[SSSWDR D.9]
Public Works Administrator (Streets/Sewer) / Principal Engineer SSMP Internal Audits
[SSSWDR D.10]
Principal Engineer / Assistant City Engineer
Element 2: Organization
City of Pasadena Sewer System Management Plan Page 12
Table 2-3: Positions that Implement the City’s SSMP
SSMP Element [WDR Section No.] Position(s)
Communication Program
[SSSWDR D.11]
Principal Engineer / Public Information Officer
Funding
[SSSWDR D.8.4]
Public Works Administrator (Administrative Services Division)

2.4 Chain of Communication
The Order requires the chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. Figure 2-2 contains a flowchart depicting th is chain of communication. Table 2-4 lists contact phone numbers for the parties included in the chain of communication.

Figure 2-2: Spill Response Chain of Communication

Element 2: Organization

City of Pasadena Sewer System Management Plan Page 13
Table 2-4: Contact Numbers for Chain of Communication
Contact Telephone Number
City of Pasadena Main Line 626-744-7311
Public Works Department 626-744-3971
Street Maintenance Sewer Division 626-255-0778
Police Department Dispatch Center 626-744-4241
Active Capital Improvement Program Contractors:

Southwest Pipeline and Trenchless Corp
(Sewer Maintenance Services)
GRB Con, Inc.

Lift Stations:
- Multi-Tek (Rosemont and Busch Garden)
- Signal Mechanical (Rockwood)

(310) 329-8717

(626) 699-2380

(626) 333-2808
(949) 548-1125

Element 2: Organization

City of Pasadena Sewer System Management Plan Page 14

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 15
3 Legal Authority
This chapter describes the legal authority required to implement the SSMP plans and procedures.

Requirements:

D.3. LEGAL AUTHORITY: The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure;
• Require that sewer system components and connections be properly designed and constructed; • Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and • Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.

3.1 Compliance Documents
Supporting information for Element 3 is included in Appendi ces B and C . Th ese appendices include the following documents:

1. Chapter 8.14 (Grease and Oil Disposal) of the City Municipal Code (Appendix C)

2. Chapter 13.24 (Sewer Construction and Maintenance) of the City Municipal Code (Appendix D)

3.1.1 City Charter
The legal authority required for the SSMP by the SWRCB is contained within the City’s Charter:

Article III, General Law Powers, Section 301 General Law Powers - Provides for the declaration of power as provided for a charter city. (https://library.municode.com/ca/pasadena/codes/code_of_ordinances?nodeId= CH_ARTIIIPOCI_S301GEPO)
Element 3: Legal Authority

City of Pasadena Sewer System Management Plan Page 16

3.1.2 Municipal Code
The legal authority required for the SSMP by the SWRCB is also contained within the City’s Municipal Code. Chapter

8.14 (Grease and Oil Disposal) and Chapter 13.24 (Sewer Construction and Maintenance ) are dedicated to the sewer system.
(https://library.municode.com/ca/pasadena/codes/code_of_ordinances?nodeId=TIT13UTSE_CH13.24SECOMA)

3.2 Compliance Summary
The City’s legal authority to operate and maintain its sanitary sewer collection system is within the City Municipal Code. The WDR requires that the City have the legal authority in the areas shown in Table 3-1.

Table 3-1: WDR Requirements
Legal Authority Order Requirements Applicable Sections of the City Municipal Code a. Prevent illicit discharges into its sanitary sewer
system from inflow and infiltration (I&I);
unauthorized stormwater; chemical dumping;
unauthorized debris; roots; fats, oils, and grease;
and trash, including rags and other debris that
may cause
blockages
• Section 13.24.370 applies to industrial waste
discharges into sewer, restricts discharge into a
sewer connection of anything that may cause
stoppage, plugging, breakage or reduction of
sewer capacity (including roots, grease, oil, refuse,
etc.)
• Section 13.24.380 restricts the discharge of
corrosive and harmful wastes
• Section 13.24.390 & .400 states it is unlawful to
connect to the public sewer for the purpose of
discharging any of the wastes mentioned above
• Section 13.24.420 applies to illicit discharge of
rainwater, storm water, ground water, etc. into
sewer
• Section 13.24.430 applies to proper disposal of
swimming pool and cooling system discharge
• Section 13.24.460 applies to illicit discharge of
wastewater from automobile washing into the
sewer
• Section 13.24.540 provides general cleaning
policy of interceptors to prevent illicit discharges
• Section 13.24.620 applies to the maintenance of
plants, interceptors, and other facilities so that
they are kept in a safe and sanitary condition
b. Collaborate with storm sewer agencies to
coordinate emergency spill responses,
ensure access to storm sewer systems during
spill events, and prevent unintentional cross
connections of sanitary sewer infrastructure to
storm sewer infrastructure
• The City’s sewer and storm staff are all under the
same Streets Maintenance Division at the City and
therefore sewer staff are also well informed of the
storm drain system.
• The City coordinates with Los Angeles County Flood
Control District (LACFCD) in the event of a spill.
c. Require that sewer system components and
connections be properly designed and
constructed
• Section 8.14.060 applies to grease interceptor
requirements & standards
• Section 8.14.070 applies to grease trap
requirements & standards
• Section 13.24.190 thru .360 applies to general
sewer system design and construction
Element 3: Legal Authority

City of Pasadena Sewer System Management Plan Page 17
Table 3-1: WDR Requirements
Legal Authority Order Requirements Applicable Sections of the City Municipal Code • Section 13.16 applies to connections between
private property and public sewer main
d. Ensure access for maintenance, inspection,
and/or repairs for portions of the service lateral
owned and/or operated by the Enrollee
• Section 8.14.080 allows for right of entry in order
to inspect sewer connections
• Section 13.24.560 allows for access and
inspection of treatment plants, house sewers,
basins, etc.
• Section 13.24.550 allows for right to inspect any
sewer connection discharging into the City’s sewer
e. Enforce any violation of its sewer ordinances,
service agreements, or other legally binding
procedures
• Section 8.14.090 allows for enforcement of
violations from food service establishments
• Section 8.14.100 allows for enforcement of
violations from commercial businesses
• Section 13.24.030 allows for enforcement of
violations of industrial wastewater discharge
regulations
• Section 13.24.170, & .180 allows for enforcement
of violations to the connection, use, and
construction of sewer systems.
f. Obtain easement accessibility agreements for
locations requiring sewer system
operations and maintenance, as applicable
• Section 13.24.450 allows the City to access all
facilities at all reasonable times.

3.2.1 Prevention of Illicit Discharges
All measures prohibiting illicit discharges are included in Sections 13.24.370, .380, .390, .400, .420, .430, .460 and 8.14 of the City’s Municipal Code. The specific purpose of the chapter is to prevent the discharge of any pollutant into the sewers that would obstruct or damage the collection system, interfere with treatment, or threaten harm to human health or the environment.
• Stormwater and I/I - Section 13.24.420 prohibits the illicit discharge of rainwater, storm water, ground water, etc. into a sanitary sewer through direct or indirect connection. • Industrial Waste – Section 13.24.400 requires all industrial waste dischargers to obtain a permit and prohibits discharge in excess of the permit allowance.
• Chemical Dumping – Section 13.24.370 provides general liquid waste disposal policy. • Unauthorized Debris; Roots; Fats, Oils, and Grease; and Trash - Section 13.24.370 restricts discharge into a sewer connection of anything that may cause stoppage, plugging, breakage or reduction of sewer capacity. Section 8.14 restricts fats, oils, or grease being discharged into the City’s sewer system.

3.2.2 Storm Water Agency Collaboration
The maintenance of the City’s sewer and storm staff are all under the same Street Maintenance Division at the City and therefore sewer staff are also well informed of the storm drain system. The City controls their own Storm Water Protection Program which complies with all conditions of the State Water Resources Control Board. This enables a unified collaboration and flow of information between staff members. This department provides resources in responding to spills and access to storm sewer systems during spill events. Communication and training with staff Element 3: Legal Authority

City of Pasadena Sewer System Management Plan Page 18
allow both agencies to know their part in responding to spills and recognizing areas at risk, develop strategies in containing and preventing spills, and reduce risks of cross contamination. Additionally, the City’s personnel maintain knowledge of the locations of storm water collection facilities that are nearby sewer facilities.

Installation of sewer and storm water facilities are coordinated to prevent unintentional cross connections. To ensure that cross-connections between the City’s sanitary sewer and storm drain systems do not occur, the City maintains records of the alignments of both systems and when they were constructed. Additionally, the City coordinates with LACFCD in the event of a spill.

No connections to either system are allowed without a permit being first obtained from the City’s Public Works Department. Each such permit issued is to contain the following information:
• Line to which the connection was made
• Location of connection on the line
• Depth of the connection at property line
All connections to either system are inspected by a City inspector to ensure that all the above information is accurate and that the connection is made in accordance with established standards. Public Works inspectors , under the Engineering Division, are responsible for inspecting all connections within the public rights-of-way.

3.2.3 Proper Design and Construction of Sewers and Connections Regulations pertaining to the design, construction, and inspection of private sewer systems, building sewers, and connections are included in Chapter 13 of the City’s Municipal Code.

Permit Required - A permit is required prior to construction of any private sewage disposal system (plumbing code).

A permit is also required prior to constructing a building or lateral sewer or connecting to a public sewer as discussed in Section 13.24. The permit application may include review of plans and specifications by the City. • Section 13.16 applies to connections between private property and public sewer main • Section 13.24.190 thru .360 applies to general sewer system design and construction

3.2.4 Lateral Maintenance Access
Property owners are responsible for maintaining the house lateral to the property line per section 13.24.610.

Standard Drawings require a cleanout at the property line. • Section 13.24.550 allows for right to inspect any sewer connection discharging into the City’s sewer • Section 13.24.560 allows for right of entry in order to inspect sewer connections

3.2.5 Enforcement Measures
Chapter 13 permits the enforcement of sewer provisions. Written notice is provided to persons in violation, with a time limit for correction. Further enforcement provisions include declaration of a public nuisance and disconnection from public sewers. The person in violation is liable to the city for expense, loss, or damage resulting from the violation. • Section 8.14.090 allows for enforcement of violations from food service establishments • Section 8.14.100 allows for enforcement of violations from commercial businesses Element 3: Legal Authority

City of Pasadena Sewer System Management Plan Page 19
• Section 13.24.170 & .180 allows for enforcement of violations to the connection, use, and construction of sewer systems.
• Section 13.24.030 allows for enforcement of violations of industrial wastewater discharge regulations.

3.2.6 Easement Accessibility Agreements
Chapter 13, Section 24.450 grants the city engineer, superintendent, or chief engineer the authority to access and inspect sewer system connections at any reasonable time.

Element 3: Legal Authority

City of Pasadena Sewer System Management Plan Page 20

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 21
4 Operation and
Maintenance Program
This chapter describes the City’s ability to properly manage, operate, and maintain all parts of the sanitary sewer system owned and operated by the City, and that the system operators (including employees, contractors, or other agents) are adequately trained and possess adequate knowledge, skills, and abilities.

Requirements:

D.4. OPERATION AND MAINTENANCE PROGRAM: The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.

4.1. Updated Map of Sanitary Sewer System: An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valv es, and applicable stormwater conveyance facilities within the sewer system service area boundaries.

4.2. Preventive Operation and Maintenance Activities : A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.

The scheduling system must include:
• Inspection and maintenance activities;
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes. The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.

4.3. Training: In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of the General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.

4.4. Equipment Inventory : An inventory of sewer system equipment, including the identification of critical replacement and spare parts.

Element 4: Operation and Maintenance Program

City of Pasadena Sewer System Management Plan Page 22

4.1 Updated Map of Sanitary Sewer System
The City has created a comprehensive, customized, electronic based Geographic Information System (GIS) sewer collection system map, showing all pipeline segments and manholes within the City’s jurisdictional boundary. The City will prioritize keeping the GIS up-to-date and will establish a formal procedure for updating it when new assets are added to the City’s collection system or when existing assets are abandoned. The City has a full-time GIS/CAD technician that maintains the City’s GIS. The City’s engin eering staff will improve communication with the Department of Information Technology to ensure new or rehabilitated sewer system assets are accurately reflected in the GIS.

At the current time, digital maps are available indicating general pipelin e, lift station, and manhole locations. The City’s iMap database’s manhole and sewer pipeline IDs are used to store information in the City’s scheduled preventive maintenance, repair, and cleaning database, such as work order history . The City’s maintenance crew uses Lucity for accessing sewer line information and recording details of repairs and cleanings.

The City is responsible for maintaining the stormwater system and does have access to maps of the nearby storm water inlets and pipelines, as these are City-owned facilities.

The City will provide State and Regional Water Board staff with access to the map(s) through submitting the sewer geodatabase to the State and Regional Water Boards as well as including the map within this SSMP Update, which will be submitted to CIWQS once a year. An updated map of the sewer collection system is included in Appendix E.

4.2 Preventive Operation and Maintenance Activities
The City currently performs in -house preventive operation and maintenance activities. This includes periodic cleaning, regular inspection of pump stations, and investigation of customer complaints.

4.2.1 Sewer Cleaning & CCTV Inspection
The City has five dedicated crew s, made up of two staff each, for sewer line cleaning. A regular schedule is performed to ensure that the entire system is cleaned annually by zone with hot spots cleaned at least quarterly.

The City’s maintenance crew, along with th e current active CIP contractor, treat s the sewer system for roots and addresses any emergency repairs.

CCTV inspection has recently been performed on an as-needed basis rather than on a regular schedule by the street maintenance crew. If a problem is identified in the CCTV inspection, the Street Maintenance Supervisor notifies the Capital Improvements Engineer. The engineer documents the defects found and includes the repair into the Annual Sewer Relining and Point Repair Project, which is a component of the Capital Improvement Program (CIP).

The City plans to develop and implement a regular CCTV inspection schedule to ensure th at the entire system is CCTV inspected every 7 years (or approximately 14% a year). The City is planning to achieve this goal by developing a CCTV inspection schedule, including areas prone to root-intrusion. These inspections will be collected and filed in the City’s system.

4.2.2 Lift Station Maintenance
Two of the City’s sewer lift stations (Rosemont and Busch Garden) are maintained through an ongoing contract with MultiTech Pumps & Accessories, Co. The City has contracted Sigma to maintain one lift station (Rockwood). The Element 4: Operation and Maintenance Program

City of Pasadena Sewer System Management Plan Page 23
City has access to two backup generators in the case of a power outage. The contractors responsible for lift station maintenance are available 24 hours a day to service the pump stations as needed.

4.2.3 Odor Control
The City has received approximately 16 isolated odor complaints in the past 3 years , most of which were investigated and addressed. Although t he City has no official odor control program in place , it responds to complaints by inspecting the condition of the pipe sections and ensuring proper flow.

4.2.4 Corrosion Control
Over 90 percent of the pipe material in the City’s collection system is vitrified clay pipe (VCP), which is inert and does not need corrosion control. The remaining portion of the collection system is concrete pipe, cast iron pipe (CIP), or ductile iron pipe (DIP) which is not inert and does need corrosion control. To prevent corrosion, the City undertakes numerous relining projects as part of the Annual Sewer Relining and Point Repair Project within the annual Capital Improvement Program.

4.2.5 Investigation of Customer Complaints
The City promptly addresses customer complaints about the sewer system, which are typically related to sewer back-ups. The collection system staff responds immediately by conducting CCTV inspections of the lines and making necessary repairs to the affected sections or manholes. This response i nvolves assessing the complaint and resolving the issue efficiently.

4.2.6 Data Collection
City staff document their cleaning s and CCTV inspections electronically, filing them on the City’s server. They are committed to continuing to thoroughly document all maintenance activities. The City intends to add this information to their GIS database. The City plans to continue documenting and monitoring system deficiencies with recurrent issues based off complaints, field inspections, and CCTV inspection results.

4.3 Training
The City sends staff to trainings on the SSMP and all aspects of the Spill Emergency Response Plan (SERP) one to two times per year. The City also has multiple tailgate safety meetings each year. Currently these tailgate training meetings are focused on certain elements of the SSMP, such as emergency bypass training, equipment inventory, and routine sewer maintenance. The City will continue to review its training program to meet the demands of maintaining the sewer system. The City is planning on performing semiannual meetings to review sections of the SSMP. The City intends to cover the full SSMP over a year long period. The City will continue to implement training on the requirements of the General Order, Spill Emergency Response Plan procedures and practice drills, s killed estimation of spill volume for field operators, and electronic CIWQS reporting procedures for staff submitting data.

Currently, the City’s active CIP contractor does not conduct formal sewer spill response training. The contractor handles spill responses by following the documented SERP. The City plans to include formal SERP and SSMP training to its renewed contract with the active CIP contractor.

The City is committed to all trainings being documented and the records kept readily accessible.

Element 4: Operation and Maintenance Program

City of Pasadena Sewer System Management Plan Page 24

4.4 Equipment Inventory
The City maintains an equipment inventory. All sewer pipeline equipment and replacement parts are stored at the City’s Yards.

The City is responsible for ensuring that their equipment is kept in proper working condition and that backup supplies are available. The City ensures that their sewer trucks are in good working condition. The City has access to two backup generators in the case of a power outage.

The City contracts MultiTech Pumps & Accessories, Co. and Signa Mechanical for sewer pump station maintenance.

Both service providers are responsible for managing their own equipment inventory, such as spare parts for pumps.

The City contracts Herc Rentals, Inc. in case additional equipment and parts are needed for emergency repairs.

The City will create a database for spare parts and track the current inventory, ensuring that staff are updating this as repairs are made and parts are ordered. The equipment and spare parts will be checked regularly to make sure that they are in working order for use in emergencies.

Table 4-1 details the City’s current equipment and replacement parts inventory.

Table 4-1: Equipment and Replacement Parts Inventory
Item Item
Jetter main lines Gas Motors
Jetter nozzles Proofer Skids
Upper Manhole Steel Roller Guide 3 count – 400’ hose spools Tiger-Tail with Removable Rope & Clip 1 count – CCTV Camera Truck Root Cutter 4 count – Vactor Truck
Debris Baskets 1 count – Tripod & Harness
Catch Basin Spoons & Poles 4 count – Bypass Pumps
Hose Clamps 2 count – Temporary Pumps for Lift Stations

City of Pasadena Sewer System Management Plan Page 25
5 Design and Performance Provisions
This chapter references the design and construction standards & specifications for new sewer systems, pump stations, and other appurtenances, and for the rehabilitation and repair of existing sewer systems. Also included are the procedures and standards for the inspection and testing of these facilities.

Requirements:

D.5. DESIGN AND PERFORMANCE PROVISIONS: The Plan must include the following items as appropriate and applicable to the Enrollee’s system:

5.1. Updated Design Criteria and Construction Standards and Specifications : Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in the General Order section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of th e General Order’s Attachment D, the procedures must include component-specific evaluation of the design criteria.

5.2. Procedures and Standards: Procedures and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.

5.1 Updated Design Criteria and Construction
Standards and Specifications
The City has developed standard details for construction improvements ( https://www.cityofpasadena.net/public- works/engineering-and-construction/public-works-permitting/standard-plan-drawings/#standard-plan-code-300).

The City utilizes the current edition of the Standard Publication for Public Works and Standard Plans for Public Works (Greenbook) to provide design and performance provisions.

All City-owned public sewer mains and pump stations are designed by both City staff and the City-hired consultant and constructed by the City-hired capital improvement project (CIP) contractor. The City currently maintains on-call contracts with engineering firm s for design of construction and rehabilitation related projects. Under th ese contracts, all projects are designed by a Professional Engineer registered in the State of California. The City ensures that all Contractors working on projects are licensed and insured.

5.2 Procedures and Standards
The City maintains that their sewer system pipelines, pumps, and other equipment and appurtenances are installed, tested, inspected, repaired, and rehabilitated according to the current Greenbook standards.

Element 5: Design and Performance Provisions

City of Pasadena Sewer System Management Plan Page 26

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 27
6 Spill Emergency Response Plan
This chapter provides an overview and summary of the City’s spill response, detection, mitigation, clean up, investigation, documentation, and reporting.

Requirements:

D.6. SPILL EMERGENCY RESPONSE PLAN: The Plan must include an up-to-date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; • Comply with the notification, monitoring and reporting requirements of the General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities; • Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters;
• Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre -planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in the General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.

6.1 Background
The City of Pasadena (City) Department of Public Works (DPW) operates and maintains its own sanitary collection system. The City’s sanitary collection system consists of approximately 328 miles of gravity pipelines within its 23.1 Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 28
square mile sewer service area. The City’s wastewater collection system conveys untreated wastewater to Los Angeles County Sanitation District’s (LACSD) trunk sewer system via 120 separate connections.

The City of Pasadena collection system is subject to regulation and permitted under the General Order WQ 2022 - 0103-DWQ and is identified under WDID 4SSO10416. The City will annually review and assess the effectiveness of the Spill Emergency Response Plan ( SERP) and update as necessary. The latest version of the SERP, updated in 2024, is available in Appendix F.

Note: During the 10-year period extending from January 1, 2014 to December 31, 2024, the City experienced thirty- one (31) spills from within its sanitary sewer collection system.

6.2 Known Collection System Problems
The following are currently known collection system problems within the City’s system:

1. Heavy root intrusion – Tree roots infiltrate sewer pipes in search of moisture, often entering through small cracks or loose joints. Older pipes made from materials like clay, concrete, or metal are particularly susceptible to root intrusion.

2. Old and deteriorated pipes and manholes - the sanitary sewer system ranges in age from 18-138 years, with an average age of 91 years.

3. Manhole base erosion – There can be many reasons for manhole base erosion, such as heavy traffic loads, water infiltration, and hydrogen sulfide corrosion. Regular maintenance is crucial to prevent further degradation and ensure longevity of manholes.

4. Manhole cover failures - There are various possible reasons for manhole cover failures, such as heavy traffic loads, susceptibility to corrosion, and general wear and tear.

5. Cracks and fractures throughout sewer mains - Existing sewers are mostly clay pipes, which can crack as they deteriorate with age and by earth movement.

6.3 Causes of Sewer Backups
The following are currently known causes for sewer backups within the City’s system:

1. Debris -- Debris (i.e. rags, gloves, construction debris/materials, plastic bags, etc.) has caused frequent backups due to lack of scouring velocity in the laterals and main lines.

2. Root infiltration -- Root infiltration has been identified as a cause of sewer backups in laterals.

3. Grease – Grease has been identified as a cause of sewer backups in laterals.

6.4 Preventative Maintenance
Refer to Section 4.2 for the City’s preventative maintenance program.

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 29

6.5 Overflow Detection
Detection of a sanitary sewer spill may occur in numerous ways:

1. If an outside party calls in to report a spill, the Collection System Crew Supervisor in the Public Works/Street Maintenance Division or his/her designee shall be notified immediately. a. If this occurs after hours, the caller is directed to the Police Dispatch who will notify the on-call personnel.

2. The Collection System Crew Supervisor, or his/her designee, upon determining that the sewer problem is the City's responsibility, will mobilize necessary City personnel and equipment to the spill location and contact the City's active sewer maintenance/cap ital improvement program (CIP) services contractor for emergency service, if needed.

3. If there is a risk or threat to public safety, the Collection System Crew Supervisor will notify the Public Works Superintendent, or his/her designee, to oversee the response.

4. If the spill is contained within private property and is the responsibility of the private party , City personnel shall assist the responsible private property owner in contacting a qualified contractor to remove the waste material from their property.

5. City personnel involved in the Sewer Spill Response shall forward a report of the incident to their department head. The report shall detail the cause of the spill, actions taken to limit the spill, damage caused by the spill and action taken to remove the waste.

6. The City’s Legally Responsible Official (LRO), or his/her designee, shall report the spill event to the State and Regional Water Board and other agencies if applicable (such as County Health Officer, County Environmental Health Agency, Regional Water Board, and/or State Office of Emergency Services).

Section 2.4 of this SSMP details the chain of communication for reporting spills and contact numbers for these points of contact.

Pre-planned coordination and collaboration with the City’s stormwater staff will be implemented prior, during, and after a spill event.

6.6 Initial Spill Response

6.6.1 Containment Procedures
The City’s immediate response to a spill prioritizes containment. Following containment, City staff perform recovery operations, implement any necessary bypass procedures, and conduct emergency repairs. If the City crews require additional support, they may contact the City’s active pipeline CIP contractor s for emergency support. The City’s active CIP contractor s vary per fiscal year. The City’s current emergency pipeline contractor s and contact information are as follows:

Active CIP Contractor Southwest Pipeline and Trenchless Corp 310-329-8717 Active CIP Contractor GRBCon, Inc. 626-699-2380

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 30
The City’s crew will attempt to keep the spill in as small an area as possible. If reasonable, the crew should attempt to keep the spill in the street and out of the storm drain or other surface water bodies. To ensure the spill is contained, the crew will use the following methods:

1. Contain the spill immediately. Contain sewage on the ground using a temporary or manmade berm , if applicable.

2. Isolate, contain, and/or divert sewage flow from any open channels and storm drain structures using sandbags, inflatable dams, or soil barriers. Sandbags or absorbent material can be used around the spill to collect the sewage and prevent it from spreading.

3. Protect storm drains by blocking upstream and downstream storm drain openings or divert ing flow with sandbags and plastic sheets, prioritizing containment within the street or hard surface. Set up traffic control per the WATCH Manual. If traffic or crowd control is required, call police dispatch at (626) 744-4501.

4. Should the spill take place in an off-road area not normally accessible to the public (i.e. field, etc.) the crew will use any reasonable means to pool the flow in that area for recovery.

5. Capture the spill.
a. If necessary, berm flow and start pumping into the closest clear and flowing manhole. b. Contact the Public Works Superintendent at (626) 744-4808. c. Evaluate the sewer system spill rate. The most senior employee on scene will evaluate the spill rate.

6. Determine the source and/or cause of the spill (i.e., evaluate type and amount of debris, illegal activities, etc.). City staff may need to observe downstream manholes to establish the location of the cause of the spill such as a blockage.
a. If the cause is determined to be private ly generated, and the damage is limited to the property, upon request the City may provide a list of cont ractors to the private owner to assist with clean up and/or pipe clearance.

7. Clear the obstruction and restore flow.
a. Restore system flow by hydro jetting, rodding, open cut excavati ng, or any other means to clear the blockage or failure point.
b. If necessary, set up a hydro jetter downstream of the blockage and jet upstream from a clear manhole. c. Capture as much of the material causing the blockage as possible. d. If unable to relieve the blockage, request immediate assistance from additional staff and appropriate equipment.
e. If still unable to clear the blockage, request immediate assistance with the establishment of bypass pumping and CCTV support to determine the problem.
f. If engineering consultation is necessary, contact the Public Works Superintendent (or City Engineer if he/she cannot be reached). He/she shall initiate an emergency work order to the City’s on -call contractor to repair the pipe.
g. Ensure the downstream manholes are clear and flowing.

8. Should the flow be too much to be contained in the street and is identified as a danger to the public the crew will allow the flow to enter the storm drain or catch basin. The crew will plug upstream and downstream portions of impacted storm drains or catch basins and recover it from that point using a vacuum truck and/or set up a diversion to a downstream manhole.

9. If necessary, request additional personnel, materials, supplies, or equipment from Departments of Police, Fire and Health that will expedite and minimize the impact of the spill, such as traffic diversion, crowd control, and street closure.

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 31

10. Upon determining and correcting the source and/or cause of the spill, a sample of the sewage may be taken as evidence for possible analysis.

11. All sewage shall be captured and discharged into the closest clear and flowing manhole. Any contaminated materials unfit for the sewer and likely to cause blockages shall be transported to a local landfill for ultimate disposal. See Section 6.7 for treatment in dry or wet weather conditions and collection instructions.

12. Estimate volume of the spill as detailed in Section 6.13.2.

13. If required, safely perform all spill sampling as detailed in the Water Quality Monitoring Plan.

14. Notify regulatory agencies about the spill and follow any additional instructions they may have.

6.6.2 Sewer Bypassing
If the spill involves damage to or collapse of a pipeline, or the spill has been determined to be prolonged for any reason, and a bypass is necessary:

1. Bypass action is to be administered, as soon as conditions safely allow, by City personnel at the location where the damaged pipeline occurs.

2. Place appropriate pumps and hoses to keep sewage in the sewer line. Appropriate measures shall be taken to determine the proper size and number of pumps required to effectively handle the sewage flow. The City contracted Herc Rentals, Inc. for equipment rental in case additional pumps, piping, or hoses are required to conduct a bypass. The contact information for Herc Rentals, Inc. is provided below:

On-Call Equipment Rental Company Phone
Herc Rentals, Inc. 818-762-9282

3. Continuous or periodic monitoring of the bypass pumping operation shall be implemented as required.

4. Perform repairs to the damaged sewer line as soon as conditions safely allow and as resources are available.

5. Regulatory agency issues shall be addressed in conjunction with emergency repairs.

6. If engineering consultation is necessary, the City has a list of On -Call Engineering Firms. The following includes a current list of the City’s On-Call General Civil Engineering Firms:

On-Call Engineering Firm(s)* Phone
Dudek 760-942-5147
KOA Corporation 714-573-0317
Tetra Tech, Inc. 949-250-6788
Ardurra Group, Inc. 714-504-2753
GHD, Inc. 562-206-7983
Transtech Engineers, Inc. 909-595-8599
*Note: New On-Call Civil Engineering Firms will be contracted by fiscal year 2026 and changes will be noted in the Change Log.

6.7 Public Access and Warning
Where spills restrict public access and require public notice and/or health warnings, the Authority will perform the following to protect public health and safety:

1. Post warning signs at the site for the public to stay out of the area and block contaminated areas with yellow caution tape and/or barricades if spill poses a public threat or it has or will reach waters of the State.

2. Use traffic cones, barricades, or warning tapes to limit pedestrian and vehicle traffic access to affected areas.

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 32

3. If the spill discharges into surface waters or waters of the State , closures shall occur 100 feet upstream and downstream of the spill, unless regulatory agencies provide alternative instructions. Signage shall occur at the discharge point, and both upstream and downstream of the spill.

4. Warning signs and other public notices shall remain in effect until there is no further risk to public health and the environment.

5. The City’s Public Information Office through the City Manager’s Office is to communicate to the public.

6.8 Recovery and Clean-Up (Mitigation)

1. If the spill occurs during dry weather conditions:
a. If necessary, contact Pasadena Police Dispatch Center at (626) 744-4241 to assist with street closure, traffic diversion, or crowd control.
b. Secure the Spill Site: Restrict public access to the spill area until cleanup is complete. c. Remove Solid Waste: Once the spill has been eliminated, use manual tools ( rakes, brooms, etc.) to scrape up and remove all solids and debris for proper disposal. d. Remove Remaining Wastewater: Any remaining standing sewage shall be vacuum pumped and discharged into a flowing, unobstructed manhole.
e. Contaminated Soil Remediation:
i. Vacuum any free-standing wastewater from contaminated soil. ii. Transport the contaminated soil to an approved landfill for disposal. f. Contaminated Structure Disinfection:
i. Disinfect contaminated structures (streets, sidewalks, buildings, etc.) by pressure spraying with a 25-ppm sodium hypochlorite solution (liquid bleach).
ii. Allow a 1-hour contact time for disinfection.
iii. Rinse the disinfected structures with water.
iv. Vacuum the wash water and dispose of it into a flowing, unobstructed manhole. v. Important Considerations:

1. Prior to pressure washing, remove all contaminated materials and soil, and block catch basins. Ensure a vacuum truck is ready to collect the wash water.

2. Prevent any water, wastewater, bleach, or containment materials from entering the storm drain system.

3. Avoid using bleach in heavily populated areas or within 100 feet of surface water or storm drain inlets. Consider less hazardous alternatives for surface disinfection.

4. Document the team's standard sidewalk/structure cleaning procedure. g. Storm Drain Cleanup (if necessary): If wastewater enters a storm drain or catch basin, use a vactor truck to vacuum the sump at a downstream catch basin while flushing the upstream curb, gutter, and pipe with clean water. Vacuum until all wash water is collected. h. Final Cleanup: Thoroughly clean the area, removing all debris (rags, paper, etc.) from the contaminated zone and its surroundings.
i. Site Restoration: Return the affected area to its original condition, or as close as possible. j. Documentation: Complete detailed documentation of all pertinent spill information before leaving the site.

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 33

2. If the spill occurs during wet weather conditions:
a. If necessary, contact Pasadena Police Dispatch Center at (626) 744-4241 to assist with street closure, traffic diversion, or crowd control.
b. Secure the Spill Site: Restrict public access to the spill area until cleanup is complete. c. Remove Solid Waste: Once the spill has been eliminated, use manual tools ( rakes, brooms, etc.) to scrape up and remove all solids and debris for proper disposal. d. Remove Remaining Wastewater: A ny remaining standing sewage shall be vacuum pumped and discharged into a flowing, unobstructed manhole.
e. Contaminated Soil Remediation:
i. Vacuum any free-standing wastewater from contaminated soil. ii. Transport the contaminated soil to an approved landfill for disposal. f. Contaminated Structure Disinfection: Clean contaminated structures (streets, sidewalks, buildings, etc.) using clean water. Avoid using bleach during wet weather to prevent environmental harm. g. Storm Drain Cleanup (if necessary): If wastewater enters a storm drain or catch basin, use a vactor truck to vacuum the sump at a downstream catch basin while flushing the upstream curb, gutter, and pipe with clean water. Vacuum until all wash water is collected. h. Final Cleanup: Thoroughly clean the area, removing all debris (rags, paper, etc.) from the contaminated zone and its surroundings.
i. Site Restoration: Return the affected area to its original condition, or as close as possible. j. Documentation:
i. Complete detailed documentation of all pertinent spill information before leaving the site. ii. If a spill is caused by lack of capacity during wet weather conditions, document the storm event and forward information to the Public Works Administrator (Street Maintenance).

6.9 Summary of Notification, Reporting, Monitoring,
and Recordkeeping Requirements
The following tables provide a summary of notification, monitoring, reporting, and recordkeeping requirements, by spill category, and for City-owned laterals, for quick reference purposes only.

6.9.1 Notification and Reporting Requirements
Table 6-1: Spill Category 1: Spills to Surface Waters
Element Requirement Method
Notification Within two (2) hours of the City’s knowledge of a Category 1 spill of 1,000 gallons or greater,
discharging or threatening to discharge to surface
waters:
• Notify the California Office of Emergency
Services and obtain a notification control
number.
• Within 24 hours:
• Call Cal OES at: (800) 852-7550
• Call or email RWQCB Region 4 at:
(213) 576-6600 or
[email protected]
• Call Pasadena Police Department
at: (626) 744-4501
• Call Pasadena Public Health at:
(626) 744-6000
• Call LA County Public Health at:
(888) 700-9995
Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 34
Table 6-1: Spill Category 1: Spills to Surface Waters
Element Requirement Method
• Notify RWQCB Region 4, Pasadena Police
Department, Pasadena Environmental
Services, LA County Public Health, and
Caltrans District 7 (if applicable).
• Call Pasadena Public Information
Office at:
(626) 744-7455
• Call Caltrans District 7 (if
applicable) (213) 897-3656
See Appendix G.

Reporting • Submit Draft Spill Report within three (3)
business days of the City’s knowledge of the
spill;
• Submit Certified Spill Report within 15
calendar days of the spill end date;
• Submit Technical Report within 45 calendar
days after the spill end date for a Category 1
spill in which 50,000 gallons or greater
discharged to surface waters; and
• Submit Amended Spill Report within 90
calendar days after the spill end date.

Enter data into the online CIWQS
Sanitary Sewer System Database1
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)2.

See Appendix H, Section H-1.

Water Quality
Monitoring
• Conduct spill-specific monitoring;
• Conduct water quality sampling of the
receiving water within 18 hours of initial
knowledge of spill of 50,000 gallons or
greater to surface waters.

Water quality records shall be
maintained and uploaded into CIWQS
as a part of Reporting requirement
above.

Record Keeping • Spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 6.14.

Table 6-2: Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters
Element Requirement Method
Notification Within two (2) hours of the City’s knowledge of a Category 2 spill of 1,000 gallons or greater,
discharging or threatening to discharge to waters
of the State:

Notify California Office of Emergency Services and
obtain a notification control number.

Within 24 hours:

Notify RWQCB Region 4, Pasadena Police
Department, Pasadena Environmental Services,
• Call or email RWQCB Region 4 at:
(213) 576-6600 or
• [email protected]
• Call Pasadena Police Department
at: (626) 744-4501
• Call Pasadena Public Health at:
(626) 744-6000
• Call LA County Public Health at:
• (888) 700-9995

1 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e -mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file.
2 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, wil l be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected] Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 35
Table 6-2: Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters
Element Requirement Method
LA County Public Health, and Caltrans District 7 (if
applicable).
• Call Caltrans District 7 (if
applicable) (213) 897-3656
See Appendix G.

Reporting • Submit Draft Spill Report within three (3)
business days of the City’s knowledge of the
spill;
• Submit Certified Spill Report within 15
calendar days of the spill end date; and
• Submit Amended Spill Report within 90
calendar days after the spill end date.

Enter data into the online CIWQS
Sanitary Sewer System Database3
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)4.

See Appendix H, Section H-2.

Water Quality
Monitoring
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into CIWQS
as a part of Reporting requirement
above.

Record Keeping • Spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 6.14.

Table 6-3: Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters Element Requirement Method
Notification Not Applicable Not Applicable
Reporting • Submit monthly Certified Spill Report to the online CIWQS Sanitary Sewer System
Database within 30 calendars days after the
end of the month in which the spills occur;
and
• Submit Amended Spill Reports within 90
calendar days after the Certified Spill Report
due date.

Enter data into the online CIWQS
Sanitary Sewer System Database5
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)6.

See Appendix H, Sections H-3 and H-5.

Water Quality
Monitoring
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into CIWQS

3 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e -mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submi t the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file.
4 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, wil l be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected] 5 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e -mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submi t the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file.
6 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, wil l be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected] Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 36
Table 6-3: Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters Element Requirement Method
as a part of Reporting requirement
above.

Record Keeping • Spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 6.14.

Table 6-4: Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters

ELEMENT REQUIREMENT METHOD
Notification Not Applicable Not Applicable
Reporting • If, during any calendar month, Category 4
spills occur, certify monthly, the estimated
total spill volume exiting the sanitary sewer
system, and the total number of all Category
4 spills into the online CIWQS Sanitary
Sewer System Database, within 30 days
after the end of the calendar month in
which the spills occurred.
• Upload and certify a report, in an acceptable
digital format, of all Category 4 spills to the
online CIWQS Sanitary Sewer System
Database, by February 1st after the end of
the calendar year in which the spills occur.

Enter data into the online CIWQS
Sanitary Sewer System Database7
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)8.

See Appendix H, Sections H-4, H-6, and
H-7.

Water Quality
Monitoring
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into CIWQS as
a part of Reporting requirement above.

Record Keeping • Individual spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 6.14.

7 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file.
8 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected] Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 37
Table 6-5: City Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters
Element Requirement Method
Notification Within two (2) hours of the City’s knowledge of a spill of 1,000 gallons or greater, from a City- owned and/or
operated lateral, discharging or threatening to discharge to waters of the State:

Notify California Office of Emergency Services and obtain a notification control number.

Within 24 hours:

Notify RWQCB Region 7, Imperial County Public Health,
and Imperial County Environmental Health.

Not applicable to a spill of less than 1,000 gallons.
• Call Cal OES at:
• (800) 852-7550
• Call or email RWQCB Region
7 at:
• (760) 346-7491 or
RB7SpillReporting@waterbo
ards.ca.gov
• Call Imperial County Public
Health at:
• (442) 265-1444
• Call Imperial County
Environmental Health at:
• (442) 265-1888
See Appendix G.

Reporting • Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not discharge to a surface water) to the online CIWQS Sanitary Sewer
System Database, by February 1st after the end of the
calendar year in which the spills occur.
• Report a lateral spill of any volume that discharges to a surface water as a Category 1 spill.

Enter data into the online
CIWQS Sanitary Sewer System
Database9
(http://ciwqs.waterboards.ca.go
v/), certified by the Legally
Responsible Official(s)10.

See Appendix H, Sections H-6
and H-7.

Water Quality
Monitoring
• Conduct visual monitoring. Water quality records shall be maintained and uploaded into
CIWQS as a part of Reporting
requirement above.

See Appendix C within the
attached SERP (Appendix F) for
Water Quality Monitoring Plan.

Record Keeping • Individual spill event records
• Total annual spill records
• Collection system telemetry records if relied upon to document and/or estimate spill Volume
Self-maintained records shall be
available during inspections or
upon request.

See Section 6.14.

6.10 Notification
Appendix G of this SSMP details the notification requirements for reporting spills.

9 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file.
10 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected] Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 38

6.11 Reporting
Appendix H of this SSMP details the reporting requirements for spills.

6.12 Monitoring
Appendix C of the attached SERP (Appendix F) details the Water Quality Monitoring Plan that will be implemented immediately upon discovery of any Category 1 sewage spill in which an estimated 50,000 gallons or greater are discharged into a surface water.

6.13 Spill-Specific Monitoring Requirements

6.13.1 Spill Location and Spread
The City shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The City shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.
o For multiple appearance points of a single spill event, the points closest to the spill origin. • Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.

6.13.2 Spill Volume Estimation
To estimate the approximate magnitude and extent of a spill, the City will use updated volume estimation methods, calculations, and documentation for electronic reporting. Estimations are based on direct container measurements and dipstick readings. Spill volume is calculated using the rate at which a manhole fills during the event, based on its internal volume. As additional information becomes available during and after the spill, the City will update its notifications and reporting of the estimated volume, including any recovered spill.

6.14 Investigation, Recordkeeping and Documentation
For proper documentation of each spill, the City will perform the following, at a minimum:

1. Determine the Category of the spill.

2. Determine the size and extent of the spill. (Refer to Section 6.13 for additional information.)

3. Determine any potential hazards, such as vehicle and pedestrian traffic. (Refer to Section 6.7 for Public Access and Warning guidance.)

4. Identify receiving water that may be impacted by spill.

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 39

5. Document and recording all pertinent information of the spill. (Refer to Appendix H for a detailed list of information to be gathered.)

6. Determine the cause of the spill

7. Document findings of the investigation on the Public Works Emergency Call Out Sheet.

8. Determine what, if any, necessary repairs are needed.

9. Budget and schedule repairs, if required.

6.14.1 Recordkeeping Requirements
The City shall maintain records to document compliance with the provisions of the General Order, and previous General Order 2006 -0003-DWQ as applicable, for each sanitary sewer system owned, including any required records generated by a City’s contractor(s).

6.14.1.1 Recordkeeping Time Period
The City shall maintain records of this Spill Emergency Response Plan for five (5) years.

6.14.1.2 Availability of Documents
The City shall make the records readily available, either electronic or hard copies, for review by Water Board staff during on-site inspections or through an information request.

6.14.1.3 Spill Reports
The City shall maintain records for each of the following spill-related events and activities:
• Spill event complaint, including but not limited to records documenting how the City responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
o Date, time, and method of notification
o Date and time the complainant first noticed the spill, if available o Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available o Complainant’s contact information, if available
o Final resolution of the complaint
• Records documenting the steps and/or remedial action(s) undertaken by the City, using all available information • Records documenting how estimate(s) of volume(s) and, if applicable, volume(s) of spill recovered were calculated
• All California Office of Emergency Services notification records, as applicable • Records, in accordance with the Monitoring Requirements, once developed

6.14.2 Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills
The City must maintain the following records for each individual Category 4 spill and for each individual non - Category 1 City-owned and/or operated lateral spill, and report in accordance with Appendix H section H-6 (Annual Certified Spill Reporting of Category 4 and/or Lateral Spills).

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 40

6.14.2.1 Recordkeeping of Individual Category 4 Spill Information:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions

2. Spill location name

3. Description and GPS coordinates for the system location where the spill originated

4. Did the spill reach a drainage conveyance system? If Yes:
a. Description of drainage conveyance system location
b. Estimated spill volume fully recovered within the drainage conveyance system c. Estimated spill volume remaining within the drainage conveyance system

5. Estimated total spill volume exiting the sanitary sewer system

6. Spill date and start time

7. Spill cause(s) (for example, root intrusion, grease deposition, etc.)

8. System failure location (for example, main, pump station, etc.)

9. Description of spill response activities including description of immediate spill containment and cleanup efforts

10. Description of how the volume estimation was calculated, including, at minimum a. The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and b. The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time

14. Description of implemented system modifications and operating/maintenance modifications.

6.14.2.2 Recordkeeping of Individual Lateral Spill Information:

1. Date and time the City was notified of, or self-discovered, the spill

2. Location of individual spill

3. Estimated individual spill volume

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.)

5. Description of how the volume estimations were calculated

6.14.2.3 Total Annual Spill Information:

For all Category 4 spills, the City will collect and maintain the following information:

1. Estimated total annual spill volume

2. Description of spill corrective actions, including at minimum:
a. Local regulatory enforcement action taken against the sewer lateral owner in response to a spill, as applicable, and
b. System operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill location.

6.14.3 Sewer System Telemetry Records
The City shall maintain the following sewer system telemetry records if used to document compliance with the General Order, and previous General Order 2006-0003-DWQ as applicable, including spill volume estimates:

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 41
• Supervisory control and data acquisition (SCADA) system(s) • Alarm system(s)
• Flow monitoring device(s) or other instrument(s) used to estimate sewage flow rates, and/or volumes • Computerized maintenance management system records
• Asset management-related records

6.14.4 Sewer System Management Plan Implementation Records The City shall maintain records documenting the City’s implementation of its Sewer System Management Plan, including documents supporting its Sewer System Management Plan audits, corrections, modifications, and updates to the Sewer System Management Plan.

6.14.5 Audit Records
The City will maintain, at minimum, the following records pertaining to its Sewer System Management Plan audits, which includes this Spill Emergency Response Plan, and other internal audits:
• Completed audit documents and findings
• Name and contact information of staff and/or consultants that conducted or involved in the audit • Follow-up actions based on audit findings

6.14.6 Equipment Records
The City will maintain a log of all owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.

6.14.7 Work Orders
The City will maintain record of work orders for operations and maintenance projects.

6.15 Post Spill Assessment
After a spill, the City is to assess their spill response. The City is to analyze:
• The cause of the spill
• Average and maximum response time
• Percent of total spill volume contained or returned to sewer • Compliance with notification, monitoring, and reporting requirements • Public Notification
• What repairs were performed
This assessment is to be used to update the Spill Emergency Response Plan as necessary and to conduct additional training where needed.

Element 6: Spill Emergency Response Plan

City of Pasadena Sewer System Management Plan Page 42

6.16 Annual Review
The City is to annually review and assess the effectiveness of the Spill Emergency Response Plan. Updates to the Spill Emergency Response Plan should be made as necessary based on this review.

6.17 Annual Report
Section H-8 of Appendix H of this SSMP details the reporting requirements for the City’s Annual Report. The City shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of the General Order, for each calendar year (January 1 through December 31).

6.18 Spill Response Equipment
The following is a list of the City’s spill response equipment:
a. One (1) Vactor Combination Hydro Jet/Vacuum Truck
b. Three (3) Vacuum/Jetter Trucks
c. 1500-ft of 6” lay flat hose
d. 100-ft of Suction hose
e. 100-gal Big Orange degreaser
f. Video camera
g. Absorbing sock
h. Four (4) transfer pumps with a 3” suction and discharge capability i. Four (4) of the 3” X 100’ discharge hose
j. Two (2) of the 3” X 20’ suction hose.

6.19 Training
Training is conducted through the City of Pasadena’s Public Works Department. Staff and contractors are appropriately trained on the Spill Emergency Response Plan procedures and practice drills. Sewer staff and any contractors utilized for cleaning, CCTV i nspection and/or emergency response are trained twice a year . The City implements training with staff from sewer and storm to know their part in responding to spills and recognizing areas at risk, develop strategies in containing and preventing spills, and reduce risks of cross contamination.

City of Pasadena Sewer System Management Plan Page 43
7 Sewer Pipe Blockage
Control Program
This chapter discusses the City’s sewer pipe blockage control measures, including identification of problem areas, focused cleaning, and source control.

Requirements:

D.7. SEWER PIPE BLOCKAGE CONTROL PROGRAM: The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed. The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances;
• A plan and schedule for the disposal of pipe -blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements;
• Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance; • An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and • Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.

Fats, oils, and grease (FOG), rags and debris have been identified as one source of blockages in the City’s collection system. The City implements a Sewer Pipe Blockage Control Program, which aims to prevent the discharge of FOG, rags, and debris into the sanitary sewer and storm drain systems. The program also aims to prevent spills and illegal discharge into the storm drain, subsequently improving public health and safety , protecting waterways, and reducing sewer maintenance costs.

Over the last 10 years (2015 -2024), there have been twenty -nine (29) spills total, seven (7) spills of which are known to have been attributed to fats, oils, grease, rags, and debris. The City formally tracks sanitary sewer system sections subject to FOG blockages and cleans each segment on a quarterly basis. Appendix I provides a map showing the FOG cleaning runs across the city.

Element 7: Sewer Pipe Blockage Control Program

City of Pasadena Sewer System Management Plan Page 44
Chapter 8.14 (Grease and Oil Disposal Ordinance) of the City Municipal Code regulates the disposal of food service establishment cooking greases so as to prevent blockages in the city's sewer system caused by the collection of grease, thereby forcing raw sewage to escape through manhole covers, surface drainage systems or other inappropriate exit points.

All industrial dischargers are required to obtain a wastewater discharge permit from the City. All new restaurants are required to install a grease interceptor and must receive approval by the Department of Planning and Development (DPD) and Pasadena Public Health Department. Such establishments may request a variance to allow for the installation o f only a grease trap or an alternative pre -treatment technology. Any device installation must conform to the latest California Plumbing Code (CPC) and are inspected by the Pasadena Public Health Department for conformance with the latest CPC.

Chapter 13.24 (Sewer Construction and Maintenance) of the City Municipal Code prohibit s illicit discharges and identify measures to prevent spills and blockages to the City’s sanitary sewer system. It provides the legal authority for site inspections and enforcement of violations of industrial wastewater discharge regulations and enforcing the 2002 FOG ordinance (see Appendix I).

In January 2023, the City’s Stormwater Program Administrator embarked on a public outreach campaign with industrial and commercial facilities regarding the importance of N ational Pollutant Discharge Elimination System (NPDES) and FOG inspection programs to ensure public health safety, improve water quality and the environment.

To reduce the impacts to municipal infrastructure , t he City developed a formal FOG inspection program for inspecting and enforcing the 2002 FOG ordinance.supported by a new fee assessment.

As of July 1st, 2024, all commercial and industrial facilities whose activities produce FOG, are required to be inspected bi-annually by the City. The inspection will provide educational awareness on proper FOG disposal and will enforce activities found to be in violation of City Code and ordinances through the Code Enforcement staff. The City created a procedure for when the sewer staff notices any problems with the system arising from FOG, and debris, and to coordinate with the discharger to create mitiga tion strategies. The City also ensures all inspections and enforcement measures are being formally tracked in the Stormwater Multiple Application and Report Tracking System (SMARTs).

To continue educating City facilities and the public on proper FOG disposal practices and its importance to protect public health and water quality, the City developed Pasadena-specific NPDES and FOG Fact Sheets that are provided along with other NPDES inspection -related materials during the bi -annual inspection and distributed in annual business license renewal s. Department of Public Works is currently developing a public website that will house these educational links and other related materials on proper FOG disposal and overall best management practices (BMPs) for industrial and commercial facilities.

Additionally, California adopted Senate Bill 1383 (SB 1383) which requires communities to reduce organic waste disposal, such as food waste, by 75% by 2025. To achieve this mandate, the City launched its Curbside Organics Recycling program in 2022. Food waste sh all no longer be going in the trash - residential refuse customers must include bagged food waste in their Yard Waste containers. Businesses and multi-family properties are also required to subscribe and participate in organics collection services through City approved franchise haulers. These organics collection services may contribute to a decreased amount of food waste, including FOG, being disposed of down the drain. Additional information can be found at https://www.cityofpasadena.net/public-works/recycling- resources/organics-recycling/sb-1383-information-and-resources/ The City also participates in the Used Oil Payment Program offered by the Department of Resources Recycling and Recovery (CalRecycle), which provides funding for used oil and used oil filter collection and recycling programs. The funding allocated to the City are used to promote used oil recycling through advertising, Oil Filter Exchange Events, Element 7: Sewer Pipe Blockage Control Program

City of Pasadena Sewer System Management Plan Page 45
and our Curbside Used Motor Oil Pick-Up Program. The City aims to hold Oil Filter Exchange Events four to six times per year, depending on the funding and staffing availability, at local auto parts retailers. The goal of the event is to reward residents for recycling their used oil filters and provide them with oil change supplies that promote recycling and prevent spills. Customers who bring in used oil filters receive a coupon and exchange their used oil filters at the store for up to two new oil filters. The City promotes these events (and used oil recycling in general) via ads in local news outlets, City social media accounts, the City website, and flyers. Appendix I includes a sample flyer from one of the events promoting this program. Residents with City of Pasadena refuse service can also call our City Service Center (CSC) to schedule a pickup of their used motor oil and filters. City staff will deliver up to 5 containers to store the oil and pick them up at their regularly scheduled refuse pickup day by appointment only. The City also dedicates a section of their Waste Management and Recycling webpage to Used Motor Oil and Oil Filter Recycling.

This includes information on the above services, a list of Certified Collection Centers in Pasadena, and emphasizes that motor oil should never be poured into storm drains. Additional information can be found at https://www.cityofpasadena.net/public-works/recycling-resources/universal-hazardous-waste-recycling/used- motor-oil-filter-certified-collection-centers/.

Lastly, the City created maintenance requirements, best management practices requirements, recordkeeping and reporting requirements, and design standards for the removal of grease interceptors for wastewater discharge permit holders. Businesses or residences can contact the City about FOG disposal through CSC. CSC is a centralized service to help Pasadena residents connect with the City. It is available via web, LiveChat, mobile app and phone to assist in answering questions about City programs, services and events. They a re the main point of contact for residents reporting issues related to sewers or storm drains. Link to this application can be found at https://www.cityofpasadena.net/city-service-center/.

Element 7: Sewer Pipe Blockage Control Program

City of Pasadena Sewer System Management Plan Page 46

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 47
8 System Evaluation, Capacity
Assurance, and Capital Improvements
This chapter discusses the City’s capacity management measures, including the most recent Master Plan and recommended capacity improvement projects.

Requirements:

D.8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS: The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.

8.1 System Evaluation and Condition Assessment: The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available; • Identify and justify the amount (percentage) of its system for its condition to be assessed each year; • Prioritize the condition assessment of system areas that:
o Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies;
o Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas;
o Are within the vicinity of a receiving water with a bacterial -related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State; • Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.

8.2. Capacity Assessment and Design Criteria: The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; Element 8: System Evaluation, Capacity Assurance, and Capital Improvements

City of Pasadena Sewer System Management Plan Page 48
• The appropriate design storm(s) or wet weather events that causes or contributes to spill events; • The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information;
• Capacity of flood -prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher -intensity storm events as a result of climate change;
• Increases of erosive forces in canyons and streams near underground and aboveground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and
• Necessary redundancy in pumping and storage capacities.

8.3. Prioritization of Corrective Action: The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.

8.4. Capital Improvement Plan: The capital improvement plan must include the following items:
• Project schedules including completion dates for all portions of the capital improvement program; • Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.

8.1 System Evaluation and Condition Assessment
The City’s last sewer system master plan was performed in 2019. The master plan included a model of the collection system. Hydraulic simulations were performed for the present (2019), 2035 and build out time frames. Surcharged pipes were identified and recommendations made for upgrade.

Currently, the City performs CCTV inspection on an as-needed basis. If a problem is identified in the CCTV inspection, this is tracked by the maintenance crew and sent to the Engineering Department so it can be added to the Annual Sewer Relining and Point Repair Project so that it can be scheduled for repair.

The City has budgeted a sewer system master plan to be performed in fiscal year 2029. In this upcoming master plan, the City plans to utilize CCTV evaluation to assess their sewer system, identify capacity deficiencies in their system, and identify potential repair and replacement projects. The City plans to establish a regular CCTV inspection and cleaning program with a goal to CCTV inspect and clean the entire system every seven (7) years (or approximately 14% a year).

Element 8: System Evaluation, Capacity Assurance, and Capital Improvements

City of Pasadena Sewer System Management Plan Page 49
With the recent sewer rate increase approved by the City Council in the summer of 2024, the City will be able to address known issues associated with structural damage, corrosion, roots, and manhole degradation.

8.2 Capacity Assessment and Design Criteria
The 2019 Master Plan included a capacity evaluation and identified capacity-related improvement projects for the collection system only. The capacity assessment completed as part of the City’s Sewer Master Plan was based on hydraulic modeling of the City’s collection system under current (2019) and future design flows. Surcharged pipes were identified, and these pipe segments were recommended for upgrade.

City requirements state that new developments proposing a net increase of 50 Equivalent Dwelling Units (EDUs) or more must be simulated in the City’s sewer collection system hydraulic model to ensure the new connection does not negatively impact the existing system.

The City has not experienced any sanitary sewer overflows due to hydraulic deficiencies in the sewer system in the past four years. Likewise, modeling of the City’s sewer system conducted during the preparation of the 2019 Sewer Master Plan indicated no overflows were anticipated due to hydraulic deficiencies.

The City plans to include a hydraulic model in the 2029 master plan that evaluates the sewer system’s ability to convey existing and future peak flows. Additionally, this model will identify areas with limited capacity and the need for system improvements and rehabilitation based on any capacity issues identified.

8.3 Prioritization of Corrective Action
Previously, the City assessed recurring issues identified during CCTV inspections and prioritized them into specific projects. Additionally, problem areas within the sewer system were prioritized for lining as part of the Annual Sewer Relining and Point Repair Project.

8.4 Capital Improvement Plan
For capital improvements, the City has currently been performing rehabilitation and replacement projects as condition-related issues arise. If a pipeline condition-related problem is identified in the CCTV inspection, a work order is produced, and the repair is added to the annual program.

Pipelines needing immediate attention would be schedule d for rehabilitation or replacement immediately by the City’s CIP Contractor. All other rehabilitation or replacements will be generated into a project after consultant review.

The City completed four sewer relining and point repair projects from their 2019 master plan, including multiple relining projects. The City is anticipating pump station upgrade projects in the next fiscal year.

The City rehabilitated or replaced approximately 34,200 LF of pipeline in 2021, 28,250 LF in 2022, and 7,300 LF in 2023 and is anticipating to line 25,000 LF in 2024/2025.

The City only uses local funds from sewer facility charges for sewer construction and maintenance.

Once potential projects are identified in the 2029 master plan, schedules with completion dates will be included for all portions of the capital improvement program. Funding sources will also be identified in the master plan. Any coordination necessary between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects will be outlined.

Element 8: System Evaluation, Capacity Assurance, and Capital Improvements

City of Pasadena Sewer System Management Plan Page 50

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 51
9 Monitoring, Measurement and
Program Modifications
This section of the SSMP discusses parameters the City tracks to monitor the success of the SSMP and how the City plans to keep the SSMP current.

Requirements:

D.9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS : The Plan must include an Adaptive Management section that addresses Plan-implementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan Element; • Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.

In the past, the City did not have a formal process for tracking the success of SSMP elements. As issues arose and elements changed, the City tracked certain segments of each element of the SSMP such as organizational changes and system maintenance. Currently, the City is motivated to be proactive about spill prevention and understand how tracking their SSMP elements will improve efficacy of this goal.

The City will perform regular tracking of the SSMP elements and their effectiveness. The City will develop a database, or similar tool, to maintain specific information related to the SSMP, as a central repository for changes to the SSMP and regularly track the success of SSMP elements, including the preventative maintenance activities noted above. The City will evaluate whether SSMP elements have changed so that changes can be documented in a Change Log to include the specific change, the date of the change and the name of the person making the change.

The Change Log is included in Appendix J. Procedures and activities will be updated based on the tracking and assessment methods described therein. Table 9-1 details a schedule for evaluating the Monitoring, Measurement, and Program Modifications.

Table 9-1: SSMP Update Schedule
Milestones Frequency Due DATES
Evaluate whether SSMP elements
have changed
twice a year 1/1 and 7/1 every year
Track the Success of SSMP Elements twice a year 1/1 and 7/1 every year Assess the Preventative Operation
and Maintenance Activities
twice a year 1/1 and 7/1 every year

Element 9: Monitoring, Measurement and Program Modifications

City of Pasadena Sewer System Management Plan Page 52
The City has a renewed commitment to improved tracking and updating their procedures and activities as needed.

SSMP Audit findings will also be tracked and used to determine any necessary SSMP modifications. Table 9-2 describes the monitoring parameters for tracking the effectiveness of each Plan Element, which the City will also review during the SSMP Audit, in addition to the schedule depicted in Table 9-1.

Table 9-2: SSMP Monitoring Parameters, by SSMP Element
SSMP Element Summary of Element Purpose Parameters for Tracking Effectiveness (Annual)
SSMP Goal and
Introduction
Provide a plan and schedule to: (1)
properly manage, operate, and
maintain all parts of the City’s
sanitary sewer system(s), (2) reduce
and prevent spills, and (3) contain
and mitigate spills that do occur
• City is following SSMP Update Schedule
• Annually review section
Organization Document LRO(s), organization of
City staff, contact information, and
chain of communication for spill
response
• Annually review section
Legal Authority Ensure the City has sufficient legal
authority required to implement the
SSMP plans and procedures
• Annually review section
Operations and
Maintenance Program
Minimize blockages and spills;
properly manage, operate, and
maintain all parts of the sanitary
sewer system; ensure system
operators (including employees,
contractors, or other agents) are
adequately trained
• Percentage of gravity sewer lines
cleaned
• Percentage of sewer lines inspected by
televising
• Number of lift station failures
• Number of pipe failures
• Regular training related to SSMP
requirements
• Equipment inventory tracked
• Annually review section
Design and
Performance Provisions
Maintain updated design and
construction standards &
specifications for new sewer
systems, pump stations, and other
appurtenances, and for the
rehabilitation and repair of existing
sewer systems.
• Annually review section
Spill Emergency
Response Plan
Provide timely and effective
response, detection, mitigation,
clean up, investigation, and
documentation to spill emergencies;
and comply with regulatory reporting
requirements
• Average and maximum response time
• Percent of total overflow volume
contained or returned to sewer
• Compliance with notification, monitoring,
and reporting requirements
• Staff and contractors are implementing
the Spill Emergency Response Plan
• Perform regular training on the Spill
Emergency Response Plan.
• Contain any spills and prevent/minimize
discharge to waters of the State or any
drainage conveyance system
• Minimize and remediate public health
impacts and adverse impacts on
beneficial uses of waters of the State
Element 9: Monitoring, Measurement and Program Modifications

City of Pasadena Sewer System Management Plan Page 53
Table 9-2: SSMP Monitoring Parameters, by SSMP Element
SSMP Element Summary of Element Purpose Parameters for Tracking Effectiveness (Annual)
• Clean the spill area and drainage
conveyance system in a manner that does
not inadvertently impact beneficial uses in
the receiving waters
• Spill events are documented and reported
as required in the General Order
• Spill responses and assessed
• Conduct annual review of Spill Emergency
Response Plan
• Annually review section
Sewer Pipe Blockage
Control Plan
Incorporating sewer pipe blockage
control measures, including
identification of problem areas,
focused cleaning, and source control.
• Number of blockages due to FOG, rags,
debris, etc.
• Number of overflows due to FOG, rags,
debris, etc.
• Number of FOG producing facilities
inspected
• Number of enforcement measures at
FOG producing facilities
• An identification of sanitary sewer
system sections subject to fats, oils,
and grease blockages and
establishment of a cleaning schedule
• Implementation of source control
measures
• Plan and schedule for a public
education and outreach program
• Annually review section
System Evaluation,
Capacity Assurance, and
Capital Improvements
Evaluate procedures and activities
for: (1) routine evaluation and
assessment of system conditions; (2)
capacity assessment and design
criteria; (3) prioritization of corrective
actions; and (4) a capital
improvement plan.
• Number of spills due to capacity
limitations or wet weather
• Date of completion of most recent
sewer master plan, including flow
metering and/or hydraulic modeling
• 3-year backlog for capacity improvement
projects
• Utilize CCTV inspection and assessment
and tracking system deficiencies
• Prioritize projects based on their need for
repair and replacement
• Evaluate system deficiencies with
recurrent issues and how these can be
turned into rehabilitation or replacement
projects.
• Creation of a schedule to complete these
projects
• Document system evaluation and
condition assessment inspections and
activities
• Determine solutions to address infiltration
& inflow (I/I), aging infrastructure,
corrosion due to sulfuric acid, and sags in
the system due to unstable soil
Element 9: Monitoring, Measurement and Program Modifications

City of Pasadena Sewer System Management Plan Page 54
Table 9-2: SSMP Monitoring Parameters, by SSMP Element
SSMP Element Summary of Element Purpose Parameters for Tracking Effectiveness (Annual)
• Determine solutions to protect from heavy
rains, earthquakes, and other impacts of
climate change
• Determine funding sources
• Annually review section
Monitoring,
Measurement and
Program Modifications
Evaluate effectiveness of SSMP,
keep SSMP up-to-date, and identify
necessary changes
• Document SSMP information
• Follow schedule for reviewing SSMP
information
• Determine effectiveness of each Plan
Element
• Assess the success of preventive
operation and maintenance activities;
• Update Plan procedures and activities
based on evaluation
• Identify and illustrate spill trends
• Annually review section
Internal Audits Formally identify SSMP effectiveness,
limitations, and necessary changes
• Date of completion of last annual audit
• Audits occur during original audit cycle
• Audit is uploaded to CIWQS within 6
months of due date
• Deficiencies found during the audit are
addressed and corrected
• Annually review section
Communication
Program
Communicate with the public and
satellite agencies.
• SSMP is uploaded/updated on City’s
website & CIWQS
• Plan and schedule for a public
education and outreach program
• Notification program to the public for
sewer system management and
information on spills and discharges
• Annually review section

The City will use the specific monitoring parameters listed in Table 9 -2 and documented on the tracking sheet included in Appendix K to assist in completion of the annual SSMP Audit described in Plan Element 10, Internal Audits. The City will also continue to collect data for all performance measures currently tracked. This additional information that the City collects, such as customer complaints and length of pipe cleaned, will be used to support or further evaluate the success and limitations of the SSMP as needed.

The City tracked scheduled preventative maintenance, repairs, and cleaning activities and is committed to improve on the consistency of this tracking, including beginning to track system deficiencies with recurrent issues to further support the success of the SSMP. The City has consistently track ed the components listed in Table 9 -3 to quantitatively determine the effectiveness of preventive operation and maintenance activities. Using this data and comparing it to spill data shown in Table 9-4, the current preventative operation and maintenance activities appear to be successful in reducing spills. However, once the City establishes a regular CCTV inspection program, they are confident this will ensure spills are further minimized by reaching their goal to CCTV inspect the entire system every seven (7) years (or approximately 14% a year), as well as performing regular rehabilitation and replacement projects to rectify condition- and capacity-deficient pipelines and infrastructure.

Element 9: Monitoring, Measurement and Program Modifications

City of Pasadena Sewer System Management Plan Page 55
Table 9-3 Preventive Operation and Maintenance Activities to Track Description of work event
Total length of gravity sewer lines cleaned
Percentage of gravity sewer lines cleaned
Total number of manhole inspections
Total length of sewer lines inspected by televising
Percentage of sewer lines inspected by televising

Table 9-4 shows the spill trends for the City. If spills do occur in the future, the City will include data related to spill frequency, locations, and estimated volumes.

Table 9-4: Spill Trends from 2014 to 2024
Year
No. of Spills
Category 1 Category 2 Category 3 Category 41 Total Spills 2014 0 0 2 N/A 2
2015 0 0 4 N/A 4
2016 1 3 6 N/A 10
2017 0 3 1 N/A 4
2018 0 0 0 N/A 0
2019 0 0 0 N/A 0
2020 1 0 0 N/A 1
2021 0 0 0 N/A 0
2022 4 0 2 N/A 6
2023 1 1 1 N/A 3
2024 0 0 0 1 1
Note:
1 Category 4 spills will be reported in 2023 and beyond.

Element 9: Monitoring, Measurement and Program Modifications

City of Pasadena Sewer System Management Plan Page 56

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 57
10 Internal Audits
This chapter discusses the City’s SSMP auditing program.

Requirements:

D.10. INTERNAL AUDITS: The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of the General Order.

The reissued State Water Resources Control Board’s Order Number WQ 2022-0103-DWQ requires that an agency conduct an internal audit of its SSMP at least once every three (3) years. The audit is to evaluate how the City has developed and implemented each of the eleven elements of the SSMP and how each element is functioning to assist in the prevention of sanitary sewer spills. The audit report shall be kept on file at the City offices and uploaded to the online California Integrated Water Quality System (CIWQS) database within 6 months after the end of the 3- year audit period. Any deficiencies found during the audit are addressed and corrected.

The due dates for the City’s SSMP and SSMP audits can be found here using the City’s WDID (4SSO10416):
https://www.waterboards.ca.gov/water_issues/programs/sso/lookup/ In 2024, the City contracted with Dudek to complete its audit and work closely with the City’s staff to review the SSMP, its implementation, and the effectiveness of the City’s efforts in reducing spills.

The City plans to complete audit requirements and due dates corresponding to the original audit cycle. The City’s next SSMP audit is to be completed and uploaded to CIWQS by 5/2/2027. During this next audit, the City will review the progress of SSMP elements and their success, areas of improvement in implementing the SSMP and preventing spills, evaluate whether they are tracking monitoring, measurement, and program modifications under Element 9, provide a description of system improvements from the previous year, and provide a description and schedule of system improvements for the upcoming year. Audit findings and recommendations will be incorporated into future SSMP Updates.

Element 10: Internal Audits

City of Pasadena Sewer System Management Plan Page 58

INTENTIONALLY LEFT BLANK

City of Pasadena Sewer System Management Plan Page 59
11 Communication Program
This section of the SSMP discusses the City’s communications with the public.

Requirements:

D.11. COMMUNICATION PROGRAM: The Plan must include the following items as appropriate and applicable to the Enrollee’s system:

The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and o The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operation, maintenance, and capital improvement-related activities.

The City maintains a website (https://www.cityofpasadena.net) to inform the public about City activities. The City’s website is an effective communication channel for providing alerts and news to the public. The main page of the website provides important announcements, agendas and minutes for City Council meetings , and other key information for City residents.

Once approved by the council on June 2, 2025 , the City will maintain its SSMP on the City’s Public Works section of their website (https://www.cityofpasadena.net/public-works/). The link to the document on the City’s website will include opportunities for public input on plan implementation and updates. The Pasadena City Council incorporates opportunities for public input regarding any sewer system concerns at its Board meetings. The City has presented the 2019 Master Sewer Plan in several public meetings and has provided the public an opportunity to comment on its findings and financial implications related to sewer use fees.

The City plans to communicate with LACSD regularly about any changes with its local industrial waste pretreatment and/or FOG program to enhance local source control efforts and improve local wastewater effluent as appropriate.

The City will use a section of the website to notify the public of important upcoming activities related to sewer system management in addition to information on spills and discharges requiring closures of public areas or that enter a source of drinking water. The City has a Public Information Office through the City Manager’s Office responsible for communicating to the public regarding the SSMP, as well as any spills and discharges. The City plans to hold public awareness events and presentations regarding SSMP implementation and updates.

Element 11: Communication Program

City of Pasadena Sewer System Management Plan Page 60

INTENTIONALLY LEFT BLANK

Appendix A
The Reissued WDR: Order Number WQ 2022-0103-DWQ

INTENTIONALLY LEFT BLANK
1 STATE WATER RESOURCES CONTROL BOARD
1001 I Street, Sacramento, California 95814
ORDER WQ 2022-0103-DWQ

STATEWIDE WASTE DISCHARGE REQUIREMENTS

GENERAL ORDER FOR SANITARY SEWER SYSTEMS
This Order was adopted by the State Water Resources Control Board on December 6, 2022.

This Order shall become effective 180 days after the Adoption Date of this General Order, on June 5, 2023.

The Enrollee shall comply with the requirements of this Order upon the Effective Date of this General Order.

This General Order does not convey any property rights of any sort or any exclusive privileges.

The requirements prescribed herein do not authorize the commission of any act causing injury to persons or property, protect the Enrollee from liability under federal, state, or local laws, nor create a vested right for the Enrollee to continue the discharge of waste.

CERTIFICATION
I, Jeanine Townsend, Clerk to the Board, do hereby certify that this Order with all attachments is a full, true, and correct copy of the Order adopted by the State Water Board on December 6, 2022.

AYE: Chair E. Joaquin Esquivel
Vice Chair Dorene D’Adamo
Board Member Sean Maguire
Board Member Laurel Firestone
Board Member Nichole Morgan
NAY: None
ABSENT: None
ABSTAIN: None
for
Jeanine Townsend
Clerk to the Board

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
2 Table of Contents

1. Introduction .................................................................................................................... 4

2. Regulatory Coverage and Application Requirements .................................................... 5

2.1. Requirements for Continuation of Existing Regulatory Coverage ....................... 5

2.2. Requirements for New Regulatory Coverage ...................................................... 5

2.3. Regulatory Coverage Transfer ............................................................................ 7

3. Findings ......................................................................................................................... 7

3.1. Legal Authorities ................................................................................................. 7

3.2. General ............................................................................................................. 11

3.3. Water Quality Control Plans, Policies and Resolutions ..................................... 14

3.4. California Environmental Quality Act ................................................................. 16

3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders ................................................................................................... 16

3.6. Notification to Interested Parties ....................................................................... 17

4. Prohibitions .................................................................................................................. 17

4.1 Discharge of Sewage from a Sanitary Sewer System ....................................... 17

4.2. Discharge of Sewage to Waters of the State..................................................... 17

4.3. Discharge of Sewage Creating a Nuisance ....................................................... 18

5. Specifications ............................................................................................................... 18

5.1. Designation of a Legally Responsible Official ................................................... 18

5.2. Sewer System Management Plan Development and Implementation ............... 18

5.3. Certification of Sewer System Management Plan and Plan Updates ................ 19

5.4. Sewer System Management Plan Audits .......................................................... 19

5.5. Six-Year Sewer System Management Plan Update .......................................... 21

5.6. System Resilience ............................................................................................. 22

5.7. Allocation of Resources .................................................................................... 22

5.8. Designation of Data Submitters ......................................................................... 22

5.9. Reporting Certification ....................................................................................... 22

5.10. System Capacity ............................................................................................... 23

5.11. System Performance Analysis .......................................................................... 23

5.12. Spill Emergency Response Plan and Remedial Actions ................................... 23

5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements ............. 24

5.14. Electronic Sanitary Sewer System Service Area Boundary Map ....................... 26

5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems ................................................................................... 26

5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services ..................................................... 27

5.17. Unintended Failure to Report ............................................................................ 27

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
3 5.18. Duty to Report to Water Boards ........................................................................ 27

5.19. Operation and Maintenance ............................................................................... 27

6. Provisions .................................................................................................................... 27

6.1. Enforcement Provisions .................................................................................... 27

6.2. Other Regional Water Board Orders ................................................................. 30

6.3. Sewer System Management Plan Availability ................................................... 31

6.4. Entry and Inspection ......................................................................................... 31

Table of Attachments
Attachment A – Definitions ..................................................................................................... A-1 Attachment B – Application for Enrollment ............................................................................. B-1 Attachment C - Notice of Termination ..................................................................................... C-1 Attachment D – Sewer System Management Plan – Required Elements .............................. D-1 Attachment E1 – Notification, Monitoring, Reporting and Recordkeeping Requirements ..... E1-1 Attachment E2 – Summary of Notification, Monitoring and Reporting Requirements ........... E2-1 Attachment F – Regional Water Quality Control Board Contact Information .......................... F-1

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
4 1. INTRODUCTION
This General Order regulates sanitary sewer systems designed to convey sewage. For the purpose of this Order, a sanitary sewer system includes, but is not limited to, pipes, valves, pump stations, manholes, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks. A sanitary sewer system includes:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

Sewage is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Sewage contains high levels of suspended solids, non-digested organic waste, pathogenic bacteria, viruses, toxic pollutants, nutrients, oxygen-demanding organic compounds, oils, grease, pharmaceuticals, and other harmful pollutants.

For the purpose of this General Order, a spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Sewage and its associated wastewater spilled from a sanitary sewer system may threaten public health, beneficial uses of waters of the State, and the environment.

This General Order serves as statewide waste discharge requirements and supersedes the previous State Water Resources Control Board (State Water Board) Order 2006-0003-DWQ and amendments thereafter. All sections and attachments of this General Order are enforceable by the State Water Board and Regional Water Quality Control Boards (Regional Water Boards). Through this General Order, the State Water Board requires an Enrollee to:
• Comply with federal and state prohibitions of discharge of sewage to waters of the State, including federal waters of the United States;
• Comply with specifications, and notification, monitoring, reporting and recordkeeping requirements in this General Order that implement the federal Clean Water Act, the California Water Code (Water Code), water quality control plans (including Regional Water Board Basin Plans) and policies;
• Proactively operate and maintain resilient sanitary sewer systems to prevent spills; • Eliminate discharges of sewage to waters of the State through effective implementation of a Sewer System Management Plan;
• Monitor, track, and analyze spills for ongoing system-specific performance improvements; and
• Report noncompliance with this General Order per reporting requirements.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
5 An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
o greater than one (1) mile in length (each individual sanitary sewer system); o one (1) mile or less in length where the State Water Board or a Regional Water Board requires regulatory coverage under this Order; or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Board or a Regional Water Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

For the purpose of this Order, a sanitary sewer system includes only systems owned and/or operated by the Enrollee.

2. REGULATORY COVERAGE AND APPLICATION REQUIREMENTS

2.1. Requirements for Continuation of Existing Regulatory Coverage To continue regulatory coverage from previous Order 2006-0003-DWQ under this General Order, within the 60-days-prior-to the Effective Date of this General Order, the Legally Responsible Official of an existing Enrollee shall electronically certify the Continuation of Existing Regulatory Coverage form in the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. The Legally Responsible Official will receive an automated CIWQS-issued Notice of Applicability email, confirming continuation of regulatory coverage under this General Order. All regulatory coverage under previous Order 2006-0003-DWQ will cease on the Effective Date of this Order.

An Enrollee continuing existing regulatory coverage is not required to submit a new application package or pay an application fee for enrollment under this General Order.

The annual fee due date for continued regulatory coverage from previous Order 2006-0003-DWQ to this General Order remains unchanged.

A previous Enrollee of Order 2006-0003-DWQ that fails to certify the Continuation of Existing Regulatory Coverage form in the online CIWQS database by the Effective Date of this Order is considered a New Applicant, and will not have regulatory coverage for its sanitary sewer system(s) until:
• A new application package for system(s) enrollment is submitted per section 2.2 (Requirements for New Regulatory Coverage) below; and
• The new application package is approved per section 2.2.2 (Approval of Application Package (For New Applicants Only)).

2.2. Requirements for New Regulatory Coverage
No later than 60 days prior to commencing and/or assuming operation and maintenance responsibilities of a sanitary sewer system, a duly authorized representative that

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
6 maintains legal authority over the public or private sanitary sewer system is required to enroll under this General Order by submitting a complete application package as specified below and as provided in Attachment B (Application for Enrollment Form) of this General Order.

Unless required by a Regional Water Board, a public agency that owns a combined sewer system subject to the Combined Sewer Overflow Control Policy (33 U.S. Code § 1342(q)), is not required to enroll, under this Order, the portions of its sanitary sewer system(s) that collects combined sanitary wastewater and stormwater.

2.2.1. Application Package Requirements
The Application for Enrollment package for new applicants must include the following items:
• Application for Enrollment Form. The form in Attachment B of this General Order must be completed, signed, and certified by a Legally Responsible Official, in accordance with section 5.1 (Designation of a Legally Responsible Official) of this General Order. If an electronic Application for Enrollment form is available at the time of application, a new applicant shall submit its application form electronically; and
• Application Fee. A fee payable to the “State Water Resources Control Board” in accordance with the Fee Schedule in the California Code of Regulations, Title 23, section 2200, or subsequent fee regulations updates.

The application fee for this General Order is based on the sanitary sewer system’s threat to water quality and complexity designations of category 2C or 3C, which is assigned based on the population served by the system. The current Fee Schedule for sanitary sewer systems is listed under subdivision (a)(2) at the following website:

Fee Schedule (https://www.waterboards.ca.gov/resources/fees/water_quality/).

2.2.2. Approval of Application Package (For New Applicants Only) The Deputy Director of the State Water Board, Division of Water Quality (Deputy Director) will consider approval of each complete Application for Enrollment package.

The Deputy Director will issue a Notice of Applicability letter which serves as approved regulatory coverage for the new Enrollee.

If the submitted application package is not complete in accordance with section 2.2.1 (Application Package Requirements) of this General Order, the Deputy Director will send a response letter to the applicant outlining the application deficiencies. The applicant will have 60 days from the date of the response letter to correct the application deficiencies and submit the identified items necessary to complete the application package to the State Water Board.

2.2.3. Electronic Reporting Account for New Enrollee
Within 30 days after the date of the Approval of Complete Application Package for System Enrollment, a duly authorized representative for the Enrollee shall obtain a CIWQS Sanitary Sewer System Database user account by clicking the “User Registration” button and following the directions on the CIWQS Login Page

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
7 (https://ciwqs.waterboards.ca.gov). If additional assistance is needed to establish an online CIWQS user account, contact State Water Board staff by email at [email protected]. The online user account will provide the Enrollee secure access to the online CIWQS database for electronic reporting.

2.3. Regulatory Coverage Transfer
Regulatory coverage under this General Order is not transferable to any person or party except after an existing Enrollee submits a written request for a regulatory coverage transfer to the Deputy Director, at least 60 days in advance of any proposed system ownership transfer. The written request must include a written agreement between the existing Enrollee and the new Enrollee containing:
• Acknowledgement that the transfer of ownership is solely of an existing system with an existing waste discharge identification (WDID) number; • The specific ownership transfer date in which the responsibility and regulatory coverage transfer between the existing Enrollee and the new Enrollee becomes effective; and
• Acknowledgement that the existing Enrollee is liable for violations occurring up to the ownership transfer date and that the new Enrollee is liable for violations occurring on and after the ownership transfer date.

The Deputy Director will consider approval of the written request. If approved, the Deputy Director will issue a Notice of Applicability letter which serves as an approved transfer of regulatory coverage to the new Enrollee.

3. FINDINGS

3.1. Legal Authorities

3.1.1. Federal and State Regulatory Authority
The objective of the Clean Water Act is to restore and maintain the chemical, physical, and biological integrity of the waters of the United States (33 U.S.C. 1251). The Water Code authorizes the State Water Board to implement the Clean Water Act in the State and to protect the quality of all waters of the State (Water Code sections 13000 and 13160).

3.1.2. Discharge of Sewage
A discharge of untreated or partially treated sewage is a discharge of waste as defined in Water Code section 13050(d) that could affect the quality of waters of the State and is subject to regulation by waste discharge requirements issued pursuant to Water Code section 13263 and Chapter 9, Division 3, Title 23 of the California Code of Regulations.

A discharge of sewage may pollute and alter the quality of the waters of the State to a degree that unreasonably affects the beneficial uses of the receiving water body or facilities that serve those beneficial uses (Water Code section 13050(l)(1)).

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
8 3.1.3 Water Boards Authority to Require Technical Reports, Monitoring, and Reporting Water Code sections 13267 and 13383 authorize the Regional Water Boards and the State Water Board to establish monitoring, inspection, entry, reporting, and recordkeeping requirements. Water Code section 13267(b), authorizes the Regional Water Boards to “require any person who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge waste within its region… or is suspected of having discharged or discharging, or who proposes to discharge, waste outside of its region that could affect the quality of water within its region shall furnish, under penalty of perjury, technical or monitoring reports which the regional board requires…In requiring those reports, the regional board shall provide the person with a written explanation with regard to the need for the reports and shall identify the evidence that supports requiring that person to provide the reports.” Water Code section 13267(f) authorizes the State Water Board to require this information if it consults with the Regional Water Boards and determines that it will not duplicate the efforts of the Regional Water Boards. The State Water Board has consulted with the Regional Water Boards and made this determination.

The technical and monitoring reports required by this General Order and Attachment E (Notification, Monitoring, Reporting and Recordkeeping Requirements) are necessary to evaluate and ensure compliance with this General Order. The effort to develop required technical reports will vary depending on the system size and complexity and the needs of the specific technical report. The burden and cost of these reports are reasonable and consistent with the interest of the state in protecting water quality, which is the primary purpose of requiring the reports.

Water Code section 13383(a) authorizes the Water Boards to “establish monitoring, inspection, entry, reporting, and recordkeeping requirements… for any person who discharges, or proposes to discharge, to navigable waters, any person who introduces pollutants into a publicly owned treatment works, any person who owns or operates, or proposes to own or operate, a publicly owned treatment works or other treatment works treating domestic sewage, or any person who uses or disposes, or proposes to use or dispose, of sewage sludge.” Section 13383(b) continues, “the state board or the regional boards may require any person subject to this section to establish and maintain monitoring equipment or methods, including, where appropriate, biological monitoring methods, sample effluent as prescribed, and provide other information as may be reasonably required.”
Reporting of spills from privately owned sewer laterals and systems pursuant to section

5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) of this General Order is authorized by Water Code section 13225(c) and encouraged by the State Water Board, wherein a local agency may investigate and report on any technical factors involved in water quality control provided the burden including costs of such reports bears a reasonable relationship to the need for the report and the benefits to be obtained therefrom. The burden of reporting private spills under section 5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) is minimal and is outweighed by the benefit of providing Regional Water Boards an opportunity to respond to these spills

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
9 when an Enrollee, which in many cases has a contractual relationship with the owner of the private system, has knowledge of the spills.

3.1.4. Water Board Authority to Prescribe General Waste Discharge Requirements Water Code section 13263(i) provides that the State Water Board may prescribe general waste discharge requirements for a category of discharges if the State Water Board finds or determines that:
• The discharges are produced by the same or similar operations; • The discharges involve the same or similar types of waste; • The discharges require the same or similar treatment standards; and • The discharges are more appropriately regulated under general waste discharge requirements than individual waste discharge requirements.

Since 2006, the State Water Board has been regulating over 1,100 publicly owned sanitary sewer systems (See section 3.1.5 (Previous Statewide General Waste Discharge Requirements) of this General Order). California also has a large unknown number of unregulated privately owned sanitary sewer systems. All waste conveyed in publicly owned and privately owned sanitary sewer systems (as defined in this General Order) is comprised of untreated or partially treated domestic waste and/or industrial waste. Generally, sanitary sewer systems are designed and operated to convey waste by gravity or under pressure; system-specific design elements and system-specific operations do not change the common nature of the waste, the common threat to public health, or the common impacts on water quality. Spills of waste from a sanitary sewer system prior to reaching the ultimate downstream treatment facility are unauthorized and enforceable by the State Water Board and/or a Regional Water Board. Therefore, spills from sanitary sewer systems are more appropriately regulated under general waste discharge requirements.

As specified in Water Code sections 13263(a) and 13241, the implementation of requirements set forth in this Order is for the reasonable protection of past, present, and probable future beneficial uses of water and the prevention of nuisance. The requirements implement the water quality control plans (Basin Plans) for each Regional Water Board and take into account the environmental characteristics of sewer service areas and hydrographic units within the state. Additionally, the State Water Board has considered water quality conditions that could reasonably be achieved through the coordinated control of all factors that affect water quality, costs associated with compliance with these requirements, the need for developing housing within California, and the need to protect sources of drinking water and other water supplies.

3.1.5. Previous Statewide General Waste Discharge Requirements On May 2, 2006, the State Water Board adopted Order 2006-0003-DWQ serving as Waste Discharge Requirements pursuant to Article 4, Chapter 4, Division 7 of the Water Code (commencing with section 13260) for inadvertent discharges to waters of the State. Order 2006-0003-DWQ prohibited discharges of untreated or partially treated sewage. Order 2006-0003-DWQ also required system-specific management, operation, and maintenance of publicly owned sewer systems greater than one mile in length.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
10 To decrease the impacts on human health and the environment caused by sewage spills, the previous Order required enrollees to develop a rehabilitation and replacement plan that identifies system deficiencies and prioritizes short-term and long-term rehabilitation actions. The previous Order also required enrollees to:

1. Maintain information that can be used to establish and prioritize appropriate Sewer System Management Plan activities; and

2. Implement a proactive approach to reduce spills.

The previous Order required Sewer System Management Plan elements for “the proper and efficient management, operation, and maintenance of sanitary sewer systems, while taking into consideration risk management.”
On July 30, 2013, the State Water Board amended General Order 2006-0003-DWQ with Order WQ 2013-0058-EXEC, Amending Monitoring and Reporting Program for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.

Many enrollees of Order 2006-0003-DWQ have already implemented proactive measures to reduce sewage spills. Other enrollees, however, still need technical assistance and funding to improve sanitary sewer system operation and maintenance for the reduction of sewage spills.

3.1.6. Existing Memorandum of Agreement with California Water Environment Association
The California Water Environment Association is a nonprofit organization dedicated to providing water industry certifications, training, and networking opportunities. The Association’s Technical Certification Program provides accredited sanitary sewer system operator certification for collection system operators and maintenance workers.

On February 10, 2016, the State Water Board entered into a collaborative agreement with the Association titled Memorandum of Agreement Between the California State Water Resources Control Board and the California Water Environment Association - Training Regarding Requirements Set Forth in Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. The Memorandum sets forth collaborative training necessary for regulated sanitary sewer system personnel to operate and maintain a well operating system and ensure full compliance with statewide sewer system regulations.

On March 15, 2018, the State Water Board and the California Water Environment Association amended the existing Memorandum of Agreement to include collaborative outreach and expand training needs associated with further updates to Water Board regulations for sanitary sewer systems. The State Water Board encourages further Agreement updates as necessary to support improved sewer system operations and the professionalism of collection system operators.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
11 3.2. General

3.2.1. Waters of the State
Waters of the State include any surface water or groundwater, including saline waters, within the boundaries of the state as defined in Water Code section 13050(e), and are inclusive of waters of the United States.

3.2.2. Sanitary Sewer System Spill Threats to Public Health and Beneficial Uses Sewage contains high levels of suspended solids, pathogenic organisms, toxic pollutants, nutrients, oxygen-demanding organic compounds, oil and grease and other pollutants. Sewage spills may cause a public nuisance, particularly when sewage is discharged to areas with high public exposure such as streets and surface waters used for drinking, irrigation, fishing, recreation, or other public consumption or contact uses.

More specifically, sanitary sewer spills may:
• Adversely affect aquatic life and/or threaten water quality when reaching receiving waters;
• Inadvertently release trash, including plastics;
• Impair the recreational use and aesthetic enjoyment of surface waters by polluting surface water or groundwater;
• Threaten public health through direct public exposure to bacteria, viruses, intestinal parasites, and other microorganisms that can cause serious illness such as gastroenteritis, hepatitis, cryptosporidiosis, and giardiasis; • Negatively impact ecological receptors and biota within surface waters; and • Cause nuisance including odors, closure of beaches and recreational areas, and property damage.

Sanitary sewer system spills may pollute receiving waters and threaten beneficial uses of surface water and groundwater. Potentially threatened beneficial uses include, but are not limited to the following (with associated acronym representations as included in statewide water quality control plans and Regional Water Boards’ Basin Plans):
• Municipal and Domestic Supply (MUN)
• Water Contact Recreation (REC-1) and Non-Contact Water Recreation (REC-2) • Cold Freshwater Habitat (COLD)
• Warm Freshwater Habitat (WARM)
• Native American Culture (CUL)
• Wildlife Habitat (WILD)
• Rare, Threatened, or Endangered Species (RARE)
• Spawning, Reproduction, and/or Early Development (SPWN) • Wetland Habitat (WET)
• Agricultural Supply (AGR)
• Estuarine Habitat (EST)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
12 • Commercial and Sport Fishing (COMM)
• Subsistence Fishing (SUB)
• Tribal Tradition and Culture (CUL)
• Tribal Subsistence Fishing (T-SUB)
• Aquaculture (AQUA)
• Marine Habitat (MAR)
• Preservation of Biological Habitats of Special Significance (BIOL) • Migration of Aquatic Organisms (MIGR)
• Shellfish Harvesting (SHELL)
• Industrial Process Supply (PROC)
• Industrial Service Supply (IND)
• Hydropower Generation (POW)
• Navigation (NAV)
• Flood Peak Attenuation/Flood Water Storage (FLD)
• Water Quality Enhancement (WQE)
• Fresh Water Replenishment (FRSH)
• Groundwater Recharge (GWR)
• Inland Saline Water Habitat (SAL)

3.2.3. Proactive Sanitary Sewer System Management to Eliminate Spill Causes Finding 3 of the previous Order, 2006-0003-DWQ, states: “Sanitary sewer systems experience periodic failures resulting in discharges that may affect waters of the state.

There are many factors (including factors related to geology, design, construction methods and materials, age of the system, population growth, and system operation and maintenance), which affect the likelihood of an SSO [sanitary sewer overflow].

A proactive approach that requires Enrollees to ensure a system-wide operation, maintenance, and management plan is in place will reduce the number and frequency of SSOs within the state. This approach will in turn decrease the risk to human health and the environment caused by SSOs.”
Many spills are preventable through proactive attention on sanitary sewer system management using the best practices and technologies available to address major causes of spills, including but not limited to:
• Blockages from sources including but not limited to:
o Fats, oils and grease;
o Tree roots;
o Rags, wipes and other paper, cloth and plastic products; and o Sediment and debris.
• Sewer system damage and exceedance of sewer system hydraulic capacity from identified system-specific environmental, and climate-change impacts, including but not limited to:

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
13 o Sea level rise impacts including flooding, coastal erosion, seawater intrusion, tidal inundation and submerged lands;
o Increased surface water flows due to higher intensity rain events; o Flooding;
o Wildfires and wildfire induced impacts;
o Earthquake induced damage;
o Landslides; and
o Subsidence.
• Infrastructure deficiencies and failures, including but not limited to:
o Pump station mechanical failures;
o System age;
o Construction material failures;
o Manhole cover failures;
o Structural failures; and
o Lack of proper operation and maintenance.
• Insufficient system capacity (temporary or sustained), due to factors including but not limited to:
o Excessive and/or increased storm or groundwater inflow/infiltration; o Insufficient capacity due to population increase and/or new connections from industrial, commercial and other system users; and
o Stormwater capture projects utilizing a sanitary sewer system to convey stormwater to treatment facilities for reuse.
• Community impacts, including but not limited to:
o Power outages;
o Vandalism; and
o Contractor-caused or other third party-caused damages.

3.2.4. Underground Sanitary Sewer System Leakage
Portions of some sanitary sewer systems may leak, causing underground exfiltration (exiting) of sewage from the system. Exfiltrated sewage that remains in the underground infrastructure trench and/or the soil matrix, and that does not discharge into waters of the State (surface water or groundwater) may not threaten beneficial uses.

Underground exfiltrated sewage may threaten beneficial uses if discharged to waters of the State. Exfiltrated sewage that discharges to groundwater may impact beneficial uses of groundwater and pollute groundwater supply. Additionally, if in close proximity, exfiltrated sewage may enter into a compromised underground drainage conveyance system that discharges into a water of the United States, or into groundwater that is hydrologically connected to (feeds into) a water of the United States, thus potentially causing: (1) a Clean Water Act violation, (2) threat and impact to beneficial uses, and/or (3) surface water pollution.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
14 3.2.5. Proactive Sanitary Sewer System Management to Reduce Inflow and Infiltration Excessive inflow (stormwater entering) and infiltration (groundwater seepage entering) to sanitary sewer systems is preventable through proactive sewer system management using the best practices and technologies available. The efficiency of the downstream wastewater treatment processes is dependent on the performance of the sanitary sewer system. When the structural integrity of a sanitary sewer system deteriorates, high volumes of inflow and infiltration can enter the sewer system. High levels of inflow and infiltration increase the hydraulic load on the downstream treatment plant, which can reduce treatment efficiency, lead to bypassing a portion of the treatment process, cause illegal discharge of partially treated effluent, or in extreme situations make biological treatment facilities inoperable (e.g., wash out the biological organisms that treat the waste).

3.3. Water Quality Control Plans, Policies and Resolutions The nine Regional Water Boards have adopted region-specific water quality control plans (commonly referred to as Basin Plans) that designate beneficial uses, establish water quality objectives, and contain implementation programs and policies to achieve those objectives. The State Water Board has adopted statewide water quality control plans, policies and resolutions establishing statewide water quality objectives, implementation programs and initiatives.

3.3.1. State Water Board Antidegradation Policy
On October 28, 1968, the State Water Board adopted Resolution 68-16, titled Statement of Policy with Respect to Maintaining High Quality of Waters in California, which incorporates the federal antidegradation policy. Resolution 68-16 requires that existing water quality be maintained unless degradation is justified based on specific findings.

The continued prohibition of sewage discharges from sanitary sewer systems into waters of the State aligns with Resolution 68-16. A sewage discharge from sanitary sewers to waters of the State is prohibited by this Order. Therefore, this Order does not allow degradation of waters of the State. In addition, this Order: (1) further expands the existing prohibition of sewage discharges to include waters of the State, in addition to waters of the United States as provided in previous Order 2006-0003-DWQ, and (2) enhances the ability for Water Board enforcement of violations of the established prohibitions.

3.3.2. State Water Board Sources of Drinking Water Policy On May 19,1988, the State Water Board adopted Resolution 88-63 (amended on February 1, 2006), titled Sources of Drinking Water, establishing state policy that all waters of the State, with certain exceptions, are suitable or potentially suitable for municipal or domestic supply.

3.3.3. State Water Board Cost of Compliance Resolution
On September 24, 2013, the State Water Board adopted Resolution 2013-0029, titled Directing Actions in Response to Efforts by Stakeholders on Reducing Costs of

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
15 Compliance While Maintaining Water Quality Protection. Through this resolution, the State Water Board committed to continued stakeholder engagement in identifying and implementing measures to reduce costs of compliance with regulatory orders while maintaining water quality protection and improving regulatory program outcomes.

3.3.4. State Water Board Human Right to Water Resolution On February 16, 2016, the State Water Board adopted Resolution 2016-0010, titled Adopting the Human Right to Water as a Core Value and Directing its Implementation in Water Board Programs and Activities, addressing the human right to water as a core value and directing Water Board programs to implement requirements to support safe drinking water for all Californians.

On November 16, 2021, the State Water Board adopted Resolution 2021-0050 titled Condemning Racism, Xenophobia, Bigotry, and Racial Injustice, and Strengthening Commitment to Racial Equity, Diversity, Inclusion, Access, and Anti-racism. Among other actions, through Resolution 2021-0050, the State Water Board, in summary as corresponding to this General Order, reaffirms its commitment to its Human Right to Water resolution, upholding that every human being in California deserves safe, clean, affordable, and accessible water for human consumption, cooking, and sanitation purposes. Resolution 2021-0050 provides the State Water Board commitment to:
• Protect public health and beneficial uses of waterbodies in all communities, including communities disproportionately burdened by wastes discharge of waste to land and surface water;
• Restore impaired surface waterbodies and degraded aquifers; and • Promote multi-benefit water quality projects.

Through Resolution 2021-0050, the State Water Board also commits to expanding implementation of its Climate Change Resolution to address the disproportionate effects of extreme hydrologic conditions and sea-level rise on Black, Indigenous, and people of color communities, prioritizing:
• The right to safe, clean, affordable, and accessible drinking water and sanitation; • Sustainable management and protection of local groundwater resources; • Healthy watersheds; and
• Access to surface waterbodies that support subsistence fishing.

On June 7, 2022, the State Water Board adopted a Resolution, titled Authorizing the Executive Director or Designee to Enter into One or More Multi-Year Contracts Up to a Combined Sum of $4,000,000 for a Statewide Wastewater Needs Assessment, supporting the equitable access to sanitation for all Californians and implementation of Resolutions 2016-0010 and 2021-0050.

This General Order supports the State Water Board priority in collecting a comprehensive set of data for California’s wastewater systems, including sanitary sewer systems. Data reported per the requirements of this Order will be used with data from other Water Boards’ programs, to further develop criteria and create a statewide risk

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
16 framework to prioritize critical funding and infrastructure investments for California’s most vulnerable populations, including disadvantaged or severely disadvantaged communities with inadequate or failing sanitation systems and threatened access to healthy drinking water supplies.

3.3.5. State Water Board Open Data Resolution
On July 10, 2018, the State Water Board adopted Resolution 2018-0032, titled Adopting Principles of Open Data as a Core Value and Directing Programs and Activities to Implement Strategic Actions to Improve Data Accessibility and Associated Innovation, directing regulatory programs to assure all monitoring and reporting requirements support the State Water Boards’ Open Data Initiative.

3.3.6. State Water Board Response to Climate Change
On March 7, 2017, the State Water Board adopted Resolution 2017-0012, titled Comprehensive Response to Climate Change, requiring a proactive response to climate change in all California Water Board actions, with the intent to embed climate change consideration into all programs and activities.

3.4. California Environmental Quality Act
The adoption of this Order is an action to reissue general waste discharge requirements that is exempt from the California Environmental Quality Act (Public Resources Code section 21000 et seq.) because it is an action taken by a regulatory agency to assure the protection of the environment and the regulatory process involves procedures for protection of the environment (Cal. Code Regs., Title 14, section 15308). In addition, the action to adopt this Order is exempt from CEQA pursuant to Cal. Code Regs., Title 14, section 15301, to the extent that it applies to existing sanitary sewer collection systems that constitute “existing facilities” as that term is used in sections 15301 and 15302, to the extent that it results in the repair or replacement of existing systems involving negligible or no expansion of capacity.

3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders
The State Water Board, Division of Financial Assistance administers the implementation of the State Water Board financial assistance programs, per Board-adopted funding policies. Among other funding areas, the Division administers loan and grant funding for the planning and construction of wastewater and water recycling facilities per funding program-specific policies and guidelines. Applicants may apply for Clean Water State Revolving Fund low-interest loan, Small Community Wastewater grant funding assistance, and other funding available at the time of application, for some of the costs associated with complying with this General Order.

Funding applicants may obtain further information regarding current funding opportunities, and Division of Financial Assistance staff contact information at the following website: Financial Assistance Funding - Grants and Loans | California State Water Resources Control Board.
(https://www.waterboards.ca.gov/water_issues/programs/grants_loans/)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
17 Section 13477.6 of the Water Code authorizes the Small Community Grant Fund.

The Small Community Grant Fund allows the State Water Board to provide grant funding assistance to small, disadvantaged communities and small severely disadvantaged communities that may not otherwise be able to afford a loan or similar financing for projects to comply with requirements of this General Order. The State Water Board also considers loan forgiveness on a disadvantaged community-specific basis.

For disadvantaged communities’ wastewater needs, the State Water Board places priority on the funding of projects that address:
• Public health;
• Violations of waste discharge requirements and National Pollutant Discharge Elimination System (NPDES) permits;
• Providing sewer system service to existing septic tank owners; and • High priority public health and water quality concerns identified by a Regional Water Board.

3.6. Notification to Interested Parties
On January 31, 2022, the State Water Board notified interested parties and persons of its intent to reissue Sanitary Sewer Systems General Order 2006-0003-DWQ by issuing a draft General Order for a 60-day public comment period. State Water Board staff conducted extensive stakeholder outreach and encouraged public participation in the adoption process for this General Order. On March 15, 2022, the State Water Board held a public meeting to hear and consider oral public comments. The State Water Board considered all public comments prior to adopting this General Order.

THEREFORE, IT IS HEREBY ORDERED, that pursuant to Water Code sections 13263, 13267, and 13383 this General Order supersedes Order 2006-0003-DWQ, Order WQ 2013-0058-EXEC, and any amendments made to these Orders thereafter, except for enforcement purposes and to meet the provisions contained in Division 7 of the Water Code (commencing with section 13000) and regulations adopted thereunder, and the provisions of the Clean Water Act and regulations and guidelines adopted thereunder, the Enrollee shall comply with the requirements in this Order.

4. PROHIBITIONS

4.1 Discharge of Sewage from a Sanitary Sewer System
Any discharge from a sanitary sewer system that has the potential to discharge to surface waters of the State is prohibited unless it is promptly cleaned up and reported as required in this General Order.

4.2. Discharge of Sewage to Waters of the State
Any discharge from a sanitary sewer system, discharged directly or indirectly through a drainage conveyance system or other route, to waters of the State is prohibited.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
18 4.3. Discharge of Sewage Creating a Nuisance
Any discharge from a sanitary sewer system that creates a nuisance or condition of pollution as defined in Water Code section 13050(m) is prohibited.

5. SPECIFICATIONS

5.1. Designation of a Legally Responsible Official
The Enrollee shall designate a Legally Responsible Official that has authority to ensure the enrolled sanitary sewer system(s) complies with this Order, and is authorized to serve as a duly authorized representative. The Legally Responsible Official must have responsibility over management of the Enrollee’s entire sanitary sewer system, and must be authorized to make managerial decisions that govern the operation of the sanitary sewer system, including having the explicit or implicit duty of making major capital improvement recommendations to ensure long-term environmental compliance.

The Legally Responsible Official must have or have direct authority over individuals that:
• Possess a recognized degree or certificate related to operations and maintenance of sanitary sewer systems, and/or
• Have professional training and experience related to the management of sanitary sewer systems, demonstrated through extensive knowledge, training and experience.

For example, a sewer system superintendent or manager, an operations manager, a public utilities manager or director, or a district engineer may be designated as a Legally Responsible Official.

The Legally Responsible Official shall complete the electronic CIWQS “User Registration” form (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp). A Legally Responsible Official that represents multiple enrolled systems shall complete the electronic CIWQS “User Registration” form for each system.

The Enrollee shall submit any change to its Legally Responsible Official, and/or change in contact information, to the State Water Board within 30 calendar days of the change by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.

5.2. Sewer System Management Plan Development and Implementation To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall develop and implement an updated Sewer System Management Plan.

The scale and complexity of the Sewer System Management Plan, and specific elements of the Plan, must match the size, scale and complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must address, at minimum, the required Plan elements in Attachment D (Sewer System Management Plan – Required Elements) of this General Order. To be effective, the Sewer System Management Plan must include procedures for the management, operation, and maintenance of the sanitary sewer system(s). The procedures must: (1) incorporate the

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
19 prioritization of system repairs and maintenance to proactively prevent spills, and (2) address the implementation of current standard industry practices through available equipment, technologies, and strategies.

For an existing Enrollee under Order 2006-0003-DWQ that has certified its Continuation of Existing Regulatory Coverage, per section 2.1 (Requirements for Continuation of Existing Regulatory Coverage) of this General Order:

Within six (6) months of the Adoption Date of this General Order:
• The Legally Responsible Official shall upload the Enrollee’s existing Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.

For a new Enrollee:

Within twelve (12) months of the Application for Enrollment approval date:
• The governing entity of the new Enrollee shall approve its Sewer System Management Plan; and
• The Legally Responsible Official shall certify and upload its Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.

5.3. Certification of Sewer System Management Plan and Plan Updates The Legally Responsible Official shall certify and upload its Sewer System Management Plan and all subsequent updates to the online CIWQS Sanitary Sewer System Database.

5.4. Sewer System Management Plan Audits
The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the Enrollee’s last required audit period. Within six months after the end of the required 3-year audit period, the Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (Sewer System Management Plan Audit Reporting Requirements) of Attachment E1 of this General Order.

Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff.

The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The Enrollee’s sewer system operators must be involved in completing the audit. At minimum, the audit must:
• Evaluate the implementation and effectiveness of the Enrollee’s Sewer System Management Plan in preventing spills;
• Evaluate the Enrollee’s compliance with this General Order; • Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
20 • Identify necessary modifications to the Sewer System Management Plan to correct deficiencies.

The Enrollee shall submit a complete audit report that includes:
• Audit findings and recommended corrective actions;
• A statement that sewer system operators’ input on the audit findings has been considered; and
• A proposed schedule for the Enrollee to address the identified deficiencies.

A new Enrollee of this General Order (that did not have a sanitary sewer system enrolled in the previous State Water Board Order 2006-0003-DWQ) shall conduct its first internal Sewer System Management Plan audit for the time period between the date of submittal of its certified Sewer System Management Plan and the third subsequent December 31st date. The audit report must be submitted into the online CIWQS Sanitary Sewer System Database by July 1 of the following calendar year.

See the following tables for clarification:

Initial Audit Period and Audit Due Date for New Enrollees Audit Period Audit Due Date
New Enrollee
Certified Sewer System Management
Plan Submittal Date
through
the third subsequent December 31st date
July 1st date after
audit period
Example
Certified Sewer System Management
Plan Submittal Date of August 2, 2025
Audit Period of August 2, 2025 through
December 31, 2027
July 1, 2028

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
21 Initial Audit Period for Transition from 2-Year Audit Required in Previous Order 2006-0003-DWQ to 3-Year Audit Required in this General Order Audit Period Audit Due Date
An Enrollee
previously
regulated by Order
2006-003-DWQ
A 3-year period starting from the end of
last required 2-year Audit Period
Within six months
after end of 3-year
Audit Period
Example
Last required Audit Period start date of
August 2, 2021;
Audit Period of August 2, 2021 through
August 1, 2024
February 1, 2025
Three-Year Ongoing Audit Period
Audit Period Audit Due Date
Each Enrollee A 3-year period starting from the end of
last required Audit Period
Within six months
after end of 3-year
Audit Period

5.5. Six-Year Sewer System Management Plan Update
At a minimum, the Enrollee shall update its Sewer System Management Plan every six (6) years after the date of its last Plan Update due date. (For an Enrollee previously regulated by Order 2006-0003-DWQ, the six-year period shall commence on the due date identified in section 3.11 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this Order. The Updated Sewer System Management Plan must include:
• Elements required in Attachment D (Sewer System Management Plan – Required Elements) of this Order;
• Summary of revisions included in the Plan update based on internal audit findings; and
• Other sewer system management-related changes.

The Enrollee’s governing entity shall approve the updated Plan. The Legally Responsible Official shall upload and certify the approved updated Plan in the online CIWQS Sanitary Sewer System Database in accordance with section 3.11 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order. During the time period in between Plan updates, the Enrollee shall continuously document changes to its Sewer System Management Plan in a change log attached to the Plan.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
22 5.6. System Resilience
The Enrollee shall include and implement system-specific procedures in its Sewer System Management Plan to proactively prioritize: (1) operation and maintenance, (2) condition assessments, and (3) repair and rehabilitation, to address ongoing system resilience, as specified in Attachment D (Sewer System Management Plan – Required Elements) of this General Order.

5.7. Allocation of Resources
The Enrollee shall:
• Establish and maintain a means to manage all necessary revenues and expenditures related to the sanitary sewer system; and
• Allocate the necessary resources to its sewer system management program for:
o Compliance with this General Order,
o Full implementation of its updated Sewer System Management Plan, o System operation, maintenance, and repair, and
o Spill responses.

5.8. Designation of Data Submitters
The Legally Responsible Official may designate one or more individuals as a Data Submitter for reporting of spill data. The Legally Responsible Official shall authorize the designation of Data Submitter(s) through the online CIWQS database (https://ciwqs.waterboards.ca.gov) prior to the individuals establishing a CIWQS user account (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp) and entering spill data into the online CIWQS Sanitary Sewer System Database.

The Legally Responsible Official shall submit any change to its Data Submitter(s), and/or change in Data Submitter contact information, to the State Water Board within 30 calendar days of the change, by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.

5.9. Reporting Certification
The Legally Responsible Official shall electronically certify, on the Enrollee’s behalf, all applications, reports, the Sewer System Management Plan(s) and corresponding updates, and other information submitted electronically into the online CIWQS Sanitary Sewer System Database, as follows:
“I certify under penalty of perjury under the laws of the State of California that the electronically submitted information was prepared under my direction or supervision.

Based on my inquiry of the person(s) directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is true, accurate, and complete, and complies with the Statewide Sanitary Sewer Systems General Order.

I am aware that there are significant penalties for submitting false information.”

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
23 Hardcopy submittals to the State Water Board must be accompanied by the above certification statement.

5.10. System Capacity
The Enrollee shall maintain the system capacity necessary to convey: (1) base flows during dry weather conditions, and (2) wet weather peak flows consistent with designated local historic storms. Design storms must take into account system-specific stormwater contributions via inflow and infiltration, and location-specific depth of groundwater and storm frequencies. The Enrollee shall implement capital improvements to provide adequate hydraulic capacity to:
• Meet or exceed the design criteria as defined in the Enrollee’s System Evaluation and Capacity Assurance element of its Sewer System Management Plan; and • Prevent system capacity-related spills, and adverse impacts to the treatment efficiency of downstream wastewater treatment facilities.

5.11. System Performance Analysis
The Enrollee shall include a running 10-year system performance analysis in its Annual Report. The analysis must include two CIWQS-generated graphs presenting the following information:

Graph 1 – Total Spill Volume per Year:

X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total spill volume, per Spill Category, for each calendar year.

Graph 2 – Total Number of Spills per Year:

X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total number of spills, per Spill Category, for each calendar year.

The current calendar year is the calendar year covered in the Annual Report.

The Enrollee shall generate the graphs in CIWQS, using the existing data in the online CIWQS Sanitary Sewer System Database at the following graph generation link:
(https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/PublicReportSSOServlet?reportActio n=criteria&reportId=sso_operation_report).

5.12. Spill Emergency Response Plan and Remedial Actions For Existing Enrollees (with regulatory coverage under Order 2006-0003-DWQ):

Within six (6) months of the Adoption Date of this General Order, the Enrollee shall update and implement its Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
24 For New Enrollees:

Within six (6) months of the Application for Enrollment approval date, the Enrollee shall develop and implement a Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.

The Enrollee shall certify, in its Annual Report, that its Spill Emergency Response Plan is up to date.

The Spill Emergency Response Plan shall include measures to protect public health and the environment. The Enrollee shall respond to spills from its system(s) in a timely manner that minimizes water quality impacts and nuisance by:
• Immediately stopping the spill and preventing/minimizing a discharge to waters of the State;
• Intercepting sewage flows to prevent/minimize spill volume discharged into waters of the State;
• Thoroughly recovering, cleaning up and disposing of sewage and wash down water; and
• Cleaning publicly accessible areas while preventing toxic discharges to waters of the State.

5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements The Enrollee shall comply with notification, monitoring, reporting, and recordkeeping requirements in Attachment E1 of this General Order.

5.13.1. Spill Categories
Individual spill notification, monitoring and reporting must be in accordance with the following spill categories:
• Category 1 Spill
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under this General Order that results in a discharge to:
o A surface water, including a surface water body that contains no flow or volume of water; or
o A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
25 A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section

3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
• Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill. • Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.
• Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

5.13.2. Annual Report
The Enrollee shall submit an Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

For new Enrollees: Within 30 days of obtaining a CIWQS account, a new Enrollee shall submit its initial Annual Report, as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
26 5.14. Electronic Sanitary Sewer System Service Area Boundary Map For continuing enrollees, starting on July 1, 2025, and no later than December 31, 2025:

For new enrollees – no earlier than July 1, 2025, or within 12 months of the Application for Enrollment approval date, whichever date is later:

The Legally Responsible Official shall submit, to the State Water Board, geospatial data detailing the locations of the Enrollee’s sanitary sewer system service area boundary, per the required content and specifications in section 3.8 (Electronic Sanitary Sewer System Service Area Boundary Map) of Attachment E1 of this General Order, for each system identified by a WDID number.

An Enrollee of a disadvantaged community that may need assistance developing an electronic map to comply with this requirement, may contact State Water Board staff for assistance at [email protected].

5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems
Within 24 hours of becoming aware of a spill (as described below) from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to report the following observations to the online CIWQS Sanitary Sewer System Database at the following link:
https://ciwqs.waterboards.ca.gov:
• A spill equal or greater than 1,000 gallons that discharges (or has a potential to discharge) to a water of the State, or a drainage conveyance system that discharges to waters of the State; or
• Any volume of sewage that discharges (or has a potential to discharge) to surface waters.

In the CIWQS module, the Enrollee is encouraged to identify:
• Time of observation;
• Description of general spill location (for example, street name and cross street names);
• Estimated volume of spill;
• If known, general description of spill destination (for example, flowing into drainage channel, flowing directly into a creek, etc.); and
• If known, name of private system owner/operator.

The CIWQS database will make the name and contact information of the entity voluntarily reporting a private spill, accessible to State and Regional Water Board staff only. The CIWQS database will only make information regarding the actual spill, accessible to the public.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
27 5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services
Upon observing or acquiring knowledge of any of the following from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to notify the California Office of Emergency Services (as provided by Health and Safety Code section 5410 et. seq. and Water Code section 13271), or inform the responsible party that State law requires such notification to the Office of Emergency Services by any person that causes or allows a sewage discharge to waters of the State:
• A spill equal to 1,000 gallons or more that discharges (or has a potential to discharge) to waters of the State, or a drainage conveyance system that discharges to waters of the State; or
• A spill of any volume to surface waters.

5.17. Unintended Failure to Report
If an Enrollee becomes aware that they unintentionally failed to submit relevant facts in any report required in this General Order, the Enrollee shall promptly notify Regional Water Board and State Water Board staff. Regional Water Board contact information is included in Attachment F of this Order. State Water Board staff shall be contacted by email at [email protected] for assistance in formally amending the corresponding report(s) in the online CIWQS Sanitary Sewer System Database.

5.18. Duty to Report to Water Boards
In accordance with Water Code section 13267 and/or section 13383, upon request by the State Water Board Executive Director (or designee) or a Regional Water Board Executive Officer (or designee), the Enrollee shall provide the requested information which the State or Regional Water Board deems necessary to determine compliance with this General Order.

5.19. Operation and Maintenance
To prevent discharges to the environment, the Enrollee shall maintain in good working order, and operate as designed, any facility or treatment and control system designed to contain sewage and convey it to a treatment plant.

6. PROVISIONS

6.1. Enforcement Provisions
The following enforcement provisions are based on existing federal and state regulations, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy.

6.1.1. Enforceability of Clean Water Act and Water Code Violations Noncompliance with requirements of this General Order or discharging sewage without enrolling in this General Order constitutes a violation of the Water Code and a potential

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
28 violation of the Clean Water Act and is grounds for an enforcement action by the State Water Board or the applicable Regional Water Board. Failure to comply with the notification, monitoring, inspection, entry, reporting, and recordkeeping requirements may subject the Enrollee to administrative civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement. Discharging waste not in compliance with the requirements of this General Order or the Clean Water Act may subject the Enrollee to administrative civil liabilities up to $10,000 a day per violation and additional liability up to $10 per gallon of discharge not cleaned up after the first 1,000 gallons of discharge; up to $5,000 a day per violation pursuant to Water Code section 13350 or up to $20 per gallon of waste discharged; or referral to the Attorney General for judicial civil enforcement.

6.1.2. Monetary Penalties
The Water Code provides the State and Regional Water Boards the authority to pursue formal enforcement actions, including imposing administrative liability and civil monetary penalties, for non-compliance with the requirements of this General Order and violations of the Clean Water Act.

6.1.3. Falsifying or Failure to Report
The Water Code provides that any person failing or refusing to furnish technical or monitoring program reports, as required under this General Order, or falsifying any information provided in the technical or monitoring reports is subject to administrative liability and civil monetary penalties. Any person who knowingly fails or refuses to furnish technical or monitoring program reports or falsifies any information provided in reports required by this General Order is subject to criminal penalties.

6.1.4. Severability of General Order
The provisions of this General Order are severable; if any provision of this Order, or the application of any provision of this Order to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this Order shall not be affected thereby.

6.1.5. Indirect Discharges
In the event that a spill enters into a drainage conveyance system, the Enrollee shall take all feasible steps to prevent discharge of sewage into waters of the State by blocking or redirecting the flow in the drainage conveyance system, removing the sewage from the drainage conveyance system, and cleaning the system in a manner that does not inadvertently impact beneficial uses of the receiving water body.

6.1.6. Water Boards’ Considerations for Discretionary Enforcement Consistent with the State Water Board Enforcement Policy, when considering Water Code section 13327 factors, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to contain, control, clean up, and mitigate spills. In assessing the factors, the State Water Board or the applicable Regional Water Board will consider:

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
29 • The Enrollee’s compliance with this General Order with a focus on compliance with reporting requirements;
• The Enrollee’s provision of adequate funding to implement the requirements of this General Order;
• The Enrollee’s compliance with providing a complete and updated Sewer System Management Plan;
• The Enrollee’s compliance with implementing its Sewer System Management Plan; • The overall effectiveness of the Enrollee’s Sewer System Management Plan with respect to:
o System management, operation, and maintenance,
o Adequate treatment facilities, sanitary sewer system facilities, and/or components with an appropriate design capacity, to reasonably prevent spills (e.g. adequately enlarging treatment or collection facilities to accommodate growth, infiltration and inflow, etc.),
o Preventive maintenance (including cleaning, root grinding, and fats, oils, and grease control) and source control measures,
o Implementation of backup equipment,
o Inflow and infiltration prevention and control,
o Appropriate sanitary sewer system capacity to prevent spills, and o The Enrollee’s responsiveness to stop and mitigate the impact of the discharge; • The Enrollee’s compliance with identifying the cause of the spill; • The Enrollee’s use of available information and observations to accurately estimate the spill volume and identify the affected or potentially affected receiving waters; • The Enrollee’s thoroughness of cleaning up sewage in drainage conveyance systems after the spill(s);
• The Enrollee’s use of water quality and biological monitoring and assessment to determine the short-term and long-term impacts to beneficial uses and the environment;
• The Enrollee’s follow up actions to improve system performance; • The Enrollee’s implementation of feasible alternatives to prevent spills, such as:
o Use of temporary storage or waste retention,
o Reduction of system inflow and infiltration,
o Collection and hauling of waste to a treatment facility, o Prevention of and/ or containment of spills due to a design storm event identified in the Enrollee’s Sewer System Management Plan,

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
30 o Implementation of available equipment, technologies, strategies, and recommended industry practices for maintaining and managing sewer systems to prevent spills, and contain and eliminate discharges to waters of the State; and • The spill duration and factors beyond the reasonable control of the Enrollee causing the event.

6.1.7. Enforcement Discretion Based on Reporting Compliance Consistent with the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to comply with spill reporting requirements when determining compliance with Water Code section 13267 and section 13383. When assessing Water Code section 13227 factors, the State Water Board or the applicable Regional Water Board will consider:
• The Enrollee’s diligence to comply with all reporting requirements in this General Order;
• The use of best available information for the Enrollee’s reporting of spill start date and start time in which the release of sewage from the sanitary sewer system initiated;
• The Enrollee’s reporting of spill end date, and end time to be the date and time in which the release of sewage from the sanitary sewer system was stopped; • The Enrollee’s diligence to accurately estimate and report spill volumes; • The Enrollee’s subsequent verification and/or updates to initial Draft Spill Reports in accordance with this General Order; and
• The Enrollee’s timely certification of required spill reports.

Consistent with Water Code section 13267 and section 13383, the State Water Board or a Regional Water Board may require an Enrollee to report the results of a condition assessment of a specified portion of the Enrollee’s sanitary sewer system.

6.2. Other Regional Water Board Orders
It is the intent of the State Water Board that sanitary sewer systems be regulated in a manner consistent with federal and state regulations. This Order will not be interpreted or applied:
• In a manner inconsistent with the federal Clean Water Act; • To authorize a spill or discharge that is illegal under either the Clean Water Act, the Water Code, and/or an applicable Basin Plan prohibition or water quality standard; • To prohibit a Regional Water Board from issuing an individual National Pollutant Discharge Elimination System (NPDES) permit or individual waste discharge requirements superseding an Enrollee’s regulatory coverage under this General Order for a sanitary sewer system authorized under the Clean Water Act or Water Code;

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER

ORDER 2022-0103-DWQ December 6, 2022
31 • To supersede any more specific or more stringent waste discharge requirements or enforcement orders issued by a Regional Water Board; or • To supersede any more specific or more stringent state or federal requirements in existing regulation, an administrative/judicial order, or Consent Decree.

6.3. Sewer System Management Plan Availability
The Enrollee’s updated Sewer System Management Plan must be maintained for public inspection at the Enrollee’s offices and facilities and must be available to the public through CIWQS and/or on the Enrollee’s website, in accordance with section 3.8 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

6.4. Entry and Inspection

6.4.1. Entry and Availability of Information
The Enrollee shall allow State and Regional Water Board staff, upon presentation of credentials and other documents as may be required by law, to:
• Enter upon the Enrollee’s premises where a regulated facility or activity is located or conducted, or where records are kept under the requirements of this General Order; • Have access to and reproduce any records required to be maintained by this General Order;
• Inspect any facility and/or equipment (including monitoring and control equipment), practices, or operations required in this General Order; and • Sample or monitor substances or parameters for assuring compliance with this General Order, or as otherwise authorized by the Water Code.

6.4.2. Pre-Inspection Questionnaire
The Enrollee shall provide pre-inspection information to State and Regional Water Board staff through the completion of a Pre-Inspection Questionnaire provided by Water Board staff.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT A – DEFINITIONS December 6, 2022 A - 1

ATTACHMENT A - DEFINITIONS
Annual Report
An Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) is a mandatory report in which the Enrollee provides a calendar-year update of its efforts to prevent spills.

Basin Plan
A Basin Plan is a water quality control plan specific to a Regional Water Quality Control Board (Regional Water Board), that serves as regulations to: (1) define and designate beneficial uses of surface and groundwaters, (2) establish water quality objectives for protection of beneficial uses, and (3) provide implementation measures.

Beneficial Uses
The term “Beneficial Uses” is a Water Code term, defined as the uses of the waters of the State that may be protected against water quality degradation. Examples of beneficial uses include but are not limited to, municipal, domestic, agricultural and industrial supply; power generation; recreation; aesthetic enjoyment; navigation; and preservation and enhancement of fish, wildlife, and other aquatic resources or preserves.

California Integrated Water Quality System (CIWQS)
CIWQS is the statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.

Data Submitter
A Data Submitter is an individual designated and authorized by the Enrollee’s Legally Responsible Official to enter spill data into the online CIWQS Sanitary Sewer System Database. A Data Submitter does not have the authority of a Legally Responsible Official to certify reporting entered into the online CIWQS Sanitary Sewer System Database.

Disadvantaged Community
A disadvantaged community is a community with a median household income of less than eighty percent (80%) of the statewide annual median household income.

For the purpose of this General Order, there is no differentiation between a small and large disadvantaged community.

Drainage Conveyance System
A drainage conveyance system is a publicly- or privately-owned separate storm sewer system, including but not limited to drainage canals, channels, pipelines, pump stations, detention basins, infiltration basins/facilities, or other facilities constructed to transport stormwater and non-stormwater flows.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT A – DEFINITIONS December 6, 2022 A - 2
Enrollee
An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
• greater than one (1) mile in length (each individual sanitary sewer system); • one mile or less in length where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order, or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

Environmentally Sensitive Area
An environmentally sensitive area is a designated agricultural and/or wildlife area identified to need special natural landscape protection due to its wildlife or historical value.

Exfiltration
Exfiltration is the underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.

Flood Control Channel
A flood control channel is a channel used to convey stormwater and non-stormwater flows through and from areas for flood management purposes.

Governing Entity
A governing entity includes but is not limited to the following:
• A publicly elected governing board, council, or commission of a municipal agency; • A Department or Division director of a federal or state agency that is not governed by a board;
• A governing board or commission of an organization or association; and • A private system owner/manager that is not governed by a board.

Hydrologically Connected
Two waterbodies are hydrologically connected when one waterbody flows, or has the potential to flow, into the other waterbody. For the purpose of this General Order, groundwater is hydrologically connected to a surface water when the
groundwater feeds into the surface water. (The surface
waterbody in this example is termed a gaining stream as it gains flow from surrounding groundwater.)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT A – DEFINITIONS December 6, 2022 A - 3
Lateral (including Lower and Upper Lateral)
A lateral is an underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the Enrollee’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership.

A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations.

An upper lateral is the portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.

Legally Responsible Official
A Legally Responsible Official is an official representative, designated by the Enrollee, with authority to sign and certify submitted information and documents required by this General Order.

Nuisance
For the purpose of this General Order, a nuisance, as defined in Water Code section 13050(m), is anything that meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property; • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal; and
• Occurs during, or as a result of, the treatment or disposal of wastes.

Private Sewer Lateral
A private sewer lateral is the privately-owned lateral that transports sewage from private property(ies) into a sanitary sewer system.

Private Sanitary Sewer System
A private sanitary sewer system is a sanitary sewer system of any size that is owned and/or operated by a private individual, company, corporation, or organization. A private sanitary sewer system may or may not connect into a publicly owned sanitary sewer system.

Potential to Discharge, Potential Discharge
Potential to Discharge, or Potential Discharge, means any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT A – DEFINITIONS December 6, 2022 A - 4
Receiving Water
A receiving water is a water of the State that receives a discharge of waste.

Resilience
Resilience is the ability to recover from or adjust to adversity or change, and grow from disruptions. Resilience can be built through planning, preparing for, mitigating, and adapting to changing conditions.

Sanitary Sewer System
A sanitary sewer system is a system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

For purpose of this Order, sanitary sewer systems include only systems owned and/or operated by the Enrollee.

Satellite Sewer System
A satellite sewer system is a portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.

Sewer System Management Plan
A sewer system management plan is a living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with this General Order.

Sewage
Sewage, and its associated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Spill
A spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under this General Order if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.

Training
Training is in-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with this General Order.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT A – DEFINITIONS December 6, 2022 A - 5
Wash Down Water
Wash down water is water used to clean a spill area.

Waste
Waste, as defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal.

Waste Discharge Identification Number (WDID)
A waste discharge identification number (WDID) identifies each individual sanitary sewer system enrolled under this General Order. A WDID number is assigned to each enrolled system upon an Enrollee’s approved regulatory coverage.

Waters of the State
Waters of the State are surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions.

Waters of the State include waters of the United States.

Waters of the United States
Waters of the United States are surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.

Water Quality Objective
A water quality objective is the limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 1
ATTACHMENT B – APPLICATION FOR ENROLLMENT

1. Enrollment Status: (Mark only one item)
☐ New Enrollee
☐ New Enrollee with previous regulatory coverage under Order 2006-0003-DWQ (that failed to certify continuation of coverage in CIWQS per Order 2022-XXXX-DWQ) Existing WDID Number: __________________________________________________

2. Applicant Information:

Legally Responsible Official Submitting Application
First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ System Owner/Operator Name: ______________________________________________ Mailing Address: ________________________________________________________ City, State, Zip: _________________________________________________________ County: _______________________________________________________________ Sanitary Sewer System Name: ____________________________________________ Regional Water Quality Control Board(s): ____________________________________ Signature and Date: _____________________________________________________

3. Applicant Type (Check one):
☐ City ☐ County ☐ State ☐ Federal ☐ Special District
☐ Government Combination ☐ Private ☐ Other Non-governmental Entity

4. Wastewater Treatment Plant Receiving Sanitary Sewer System Waste:

Wastewater Treatment Plant Permittee:________________________________________ WDID No.: ______________________________________________________________ STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 2

5. Billing Information
Billing Address: ___________________________________________________________ City, State, Zip: ___________________________________________________________ Billing Contact Person and Title: ______________________________________________ Phone and Email Address: __________________________________________________

6. Application Fee:

The application fee, as required by Water Code section 13260, is based on the daily population served by the sanitary sewer system. See updated Fee Schedule. (https://www.waterboards.ca.gov/resources/fees/water_quality/) Check one of the following and enter fee amount:
☐ Population Served < 50,000 – Total Fee submitted: $ ___________ ☐ Population Served ≥ 50,000 – Total Fee submitted: $ ___________ Make the fee payment payable to the State Water Resources Control Board and mail the complete application package to:

State Water Resources Control Board, Accounting Office
P. O. Box 1888
Sacramento, CA 95812-1888
Attention: Statewide Sanitary Sewer System Program

7. Application Submittal Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge and belief, the information in the submitted application package is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________ Date: ________________ STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 1

ATTACHMENT C - NOTICE OF TERMINATION

1. Enrollee Information
Enrollee Name: ___________________________________________________________ WDID No: ________________________________________________________________ Legally Responsible Official Requesting Termination of Coverage: ___________________ First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ Mailing Address: __________________________________________________________ City, State, Zip: ___________________________________________________________ County: _________________________________________________________________ Sanitary Sewer System Name(s) or Unique Identifier(s): ___________________________ Regional Water Quality Control Board(s): _______________________________________ Signature and Date: ________________________________________________________

2. Basis of Termination
Explanation of termination, including subsequent regulatory coverage and subsequent owner/operator of enrolled sanitary sewer system, as applicable:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 2

3. Regulatory Coverage Termination Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge: 1) the sanitary sewer system I officially represent is not required to be regulated under the Statewide Waste Discharge Requirements for Sanitary Sewer Systems Order 2022-XXXX-DWQ, and 2) the information submitted in this Notice of Termination is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. Additionally, I understand that the submittal of this Notice of Termination does not release sanitary sewer system agencies from liability for any violations of the Clean Water Act.

Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________ Date: ________________ For State Water Board Use Only
☐ Approved for Termination ☐ Denied and Returned to Enrollee Deputy Director of Water Quality Signature: _____________________________________ Date: ____________________ Notice of Termination Effective Date: __________________

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 1
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS Table of Contents

1. Sewer System Management Plan Goal And Introduction ............................................ D-2

1.1. Regulatory Context ........................................................................................... D-2

1.2. Sewer System Management Plan Update Schedule ......................................... D-3

1.3. Sewer System Asset Overview ......................................................................... D-3

2. Organization ................................................................................................................ D-3

3. Legal Authority ............................................................................................................. D-4

4. Operation And Maintenance Program .......................................................................... D-4

4.1. Updated Map of Sanitary Sewer System .......................................................... D-4

4.2. Preventive Operation and Maintenance Activities ............................................. D-4

4.3. Training ............................................................................................................. D-5

4.4. Equipment Inventory ......................................................................................... D-5

5. Design And Performance Provisions ........................................................................... D-5

5.1. Updated Design Criteria and Construction Standards and Specifications ......... D-5

5.2. Procedures and Standards ................................................................................ D-5

6. Spill Emergency Response Plan .................................................................................. D-6

7. Sewer Pipe Blockage Control Program ........................................................................ D-7

8. System Evaluation, Capacity Assurance and Capital Improvements ........................... D-7

8.1 System Evaluation and Condition Assessment ................................................. D-7

8.2. Capacity Assessment and Design Criteria ........................................................ D-8

8.3. Prioritization of Corrective Action ...................................................................... D-9

8.4. Capital Improvement Plan ................................................................................. D-9

9. Monitoring, Measurement and Program Modifications ................................................. D-9

10. Internal Audits ............................................................................................................ D-10

11. Communication Program ........................................................................................... D-10

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 2
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS A Sewer System Management Plan (Plan) is a living planning document that documents ongoing local sewer system management program activities, procedures, and decision-making – at the scale necessary to address the size and complexity of the subject sanitary sewer system(s). This Plan may incorporate other programs and other plans by reference, to address short-term and long-term system resilience through:
• Proactive planning and decision-making;
• Local government ordinances;
• Updated operations and maintenance activities and procedures; • Implementation of capital improvements;
• Sufficient local budget to support staff resources, contractors, equipment, and training; and • Updated training of staff and contractors.

The Enrollee’s development, update, and implementation of a Sewer System Management Plan addressing the requirements of this Attachment is an enforceable component of this General Order. As specified in Provision 6.1 (Enforcement Provisions) of this General Order, consistent with the Water Code and the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts in implementing an effective Sewer System Management Plan to prevent, contain, control, and mitigate spills when considering Water Code section 13327 factors to determine necessary enforcement of this General Order.

This Attachment includes the following required elements that the Enrollee shall address in its Plan and subsequent updates. The Enrollee shall identify any requirement in this Attachment that is not applicable to the Enrollee’s sewer system and shall explain in its Plan why the requirement is not applicable.

1. SEWER SYSTEM MANAGEMENT PLAN GOAL AND INTRODUCTION
The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur.

The Plan must include a narrative Introduction section that discusses the following items:

1.1. Regulatory Context
The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 3

1.2. Sewer System Management Plan Update Schedule
The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.

1.3. Sewer System Asset Overview
The Plan Introduction section must provide a description of the Enrollee-owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons; • Structures diverting stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and
• Unique service boundary conditions and challenge(s).

Additionally, the Plan Introduction section must provide reference to the Enrollee’s up- to-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment.

2. ORGANIZATION
The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order; • The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 4
health officer, county environmental health agency, and State Office of Emergency Services.)

3. LEGAL AUTHORITY
The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure; • Require that sewer system components and connections be properly designed and constructed;
• Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and
• Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.

4. OPERATION AND MAINTENANCE PROGRAM
The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.

4.1. Updated Map of Sanitary Sewer System
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.

4.2. Preventive Operation and Maintenance Activities
A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.

The scheduling system must include:
• Inspection and maintenance activities;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 5
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.

The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.

4.3. Training
In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of this General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.

4.4. Equipment Inventory
An inventory of sewer system equipment, including the identification of critical replacement and spare parts.

5. DESIGN AND PERFORMANCE PROVISIONS
The Plan must include the following items as appropriate and applicable to the Enrollee’s system:

5.1. Updated Design Criteria and Construction Standards and Specifications Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component-specific evaluation of the design criteria.

5.2. Procedures and Standards
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 6

6. SPILL EMERGENCY RESPONSE PLAN
The Plan must include an up to date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State;
• Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities;
• Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; • Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in this General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 7

7. SEWER PIPE BLOCKAGE CONTROL PROGRAM
The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed.

The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances; • A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements; • Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance;
• An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and • Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.

8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.

8.1 System Evaluation and Condition Assessment
The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 8
• Identify and justify the amount (percentage) of its system for its condition to be assessed each year;
• Prioritize the condition assessment of system areas that:
o Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies; o Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas; o Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State;
• Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.

8.2. Capacity Assessment and Design Criteria
The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; • The appropriate design storm(s) or wet weather events that causes or contributes to spill events;
• The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information; • Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 9
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change; • Increases of erosive forces in canyons and streams near underground and above- ground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and • Necessary redundancy in pumping and storage capacities.

8.3. Prioritization of Corrective Action
The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.

8.4. Capital Improvement Plan
The capital improvement plan must include the following items:
• Project schedules including completion dates for all portions of the capital improvement program;
• Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.

9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS
The Plan must include an Adaptive Management section that addresses Plan- implementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan Element;
• Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ

ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 10

10. INTERNAL AUDITS
The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order.

11. COMMUNICATION PROGRAM
The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and
o The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operation, maintenance, and capital improvement-related activities.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 1
ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING AND

RECORDKEEPING REQUIREMENTS
Table of Contents

1. Notification Requirements ......................................................................................... E1-3

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services ...................................................................................... E1-3

1.2. Spill Notification Information ........................................................................... E1-4

1.3. Notification of Spill Report Updates ................................................................ E1-4

2. Spill-Specific Monitoring Requirements .................................................................... E1-5

2.1 Spill Location and Spread .............................................................................. E1-5

2.2 Spill Volume Estimation.................................................................................. E1-5

2.3. Receiving Water Monitoring ............................................................................ E1-5

2.4. Safety and Access Exceptions ........................................................................ E1-8

3. Reporting Requirements ............................................................................................ E1-8

3.1. Reporting Requirements for Individual Category 1 Spill Reporting ................. E1-8

3.2. Reporting Requirements for Individual Category 2 Spill Reporting ............... E1-12

3.3. Monthly Certified Spill Reporting for Category 3 Spills .................................. E1-14

3.4. Monthly Certified Spill Reporting for Category 4 Spills .................................. E1-16

3.5. Amended Certified Spill Reports for Category 3 Spills .................................. E1-16

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills ............. E1-16

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” ................................................................................................ E1-16

3.8. Electronic Sanitary Sewer System Service Area Boundary Map ................... E1-17

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ) .................................................................. E1-17

3.10. Sewer System Management Plan Audit Reporting Requirements ................ E1-19

3.11. Sewer System Management Plan Reporting Requirements ......................... E1-19

4. Recordkeeping Requirements ................................................................................. E1-20

4.1. Recordkeeping Time Period .......................................................................... E1-20

4.2. Availability of Documents .............................................................................. E1-20

4.3. Spill Reports .................................................................................................. E1-20

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills ....... E1-21

4.5. Sewer System Telemetry Records ................................................................ E1-22

4.6. Sewer System Management Plan Implementation Records ......................... E1-22

4.7. Audit Records ................................................................................................ E1-23 STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 2

4.8. Equipment Records ....................................................................................... E1-23

4.9. Work Orders .................................................................................................. E1-23

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 3
ATTACHMENT E1– NOTIFICATION, MONITORING, REPORTING AND RECORDKEEPING

REQUIREMENTS
The Notification Requirements (section 1), Spill-specific Monitoring Requirements (section 2), Reporting Requirements (section 3) and Recordkeeping Requirements (section 4) in this Attachment are pursuant to Water Code section 13267 and section 13383, and are an enforceable component of this General Order. For the purpose of this General Order, the term:
• Notification means the notifying of appropriate parties of a spill event or other activity. • Spill-specific Monitoring means the gathering of information and data for a specific spill event to be reported or kept as records.
• Reporting means the reporting of information and data into the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. • Recordkeeping means the maintaining of information and data in an official records storage system.

Failure to comply with the notification, monitoring, reporting and recordkeeping requirements in this General Order may subject the Enrollee to civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement.

Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Resources Control Board ( State Water Board ) to collect sanitary sewer spill information for each spill event and make this information available to the public. Sanitary sewer spill information for each spill event includes but is not limited to: Enrollee contact information for each spill event, spill cause, estimated spill volume and factors used for estimation, location, date, time, duration, amount discharged to waters of the State, response and corrective action(s) taken.

1. NOTIFICATION REQUIREMENTS

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the Enrollee shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The Enrollee has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.

The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from an Enrollee-owned and/or operated laterals, to a water of the State.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 4

1.2. Spill Notification Information
The Enrollee shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services;
• Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
o Brief narrative of the spill event, and
o Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks;
• Name and phone number of contact person on-scene;
• Date and time the Enrollee was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.

1.3. Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the Enrollee certifies the spill report in the online CIWQS Sanitary Sewer System Database, the Enrollee shall provide updates to the California Office of Emergency Services regarding substantial changes to:
• Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and
• Additional impact(s) to the receiving water(s) and beneficial uses.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 5

2. SPILL-SPECIFIC MONITORING REQUIREMENTS

2.1 Spill Location and Spread
The Enrollee shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The Enrollee shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.

For multiple appearance points of a single spill event, the points closest to the spill origin.
• Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.

2.2 Spill Volume Estimation
To assess the approximate spill magnitude and spread, the Enrollee shall estimate the total spill volume using updated volume estimation techniques, calculations, and documentation for electronic reporting. The Enrollee shall update its notification and reporting of estimated spill volume (which includes spill volume recovered) as further information is gathered during and after a spill event.

2.3. Receiving Water Monitoring

2.3.1. Receiving Water Visual Observations
Through visual observations and use of best available spill volume-estimating techniques and field calculation techniques, the Enrollee shall gather and document the following information for spills discharging to surface waters:
• Estimated spill travel time to the receiving water;
• For spills entering a drainage conveyance system, estimated spill travel time from the point of entry into the drainage conveyance system to the point of discharge into the receiving water;
• Estimated spill volume entering the receiving water; and • Photography of:
o Waterbody bank erosion,
o Floating matter,
o Water surface sheen (potentially from oil and grease), STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 6
o Discoloration of receiving water, and
o Impact to the receiving water.

2.3.2. Receiving Water – Water Quality Sampling and Analysis For sewage spills in which an estimated 50,000 gallons or greater are discharged into a surface water, the Enrollee shall conduct the following water quality sampling no later than 18 hours after the Enrollee’s knowledge of a potential discharge to a surface water:
• Collect one water sample, each day of the duration of the spill, at:
o The DCS-001 location as described in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment, if sewage discharges to a surface water via a drainage conveyance system; and/or
o Each of the three receiving water sampling locations in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment;
If the receiving water has no flow during the duration of the spill, the Enrollee must report “No Sampling Due To No Flow” for its receiving water sampling locations.

The Enrollee shall analyze the collected receiving water samples for the following constituents per section 2.3.3 (Water Quality Analysis Specifications) of this Attachment:
• Ammonia, and
• Appropriate bacterial indicator(s) per the applicable Basin Plan water quality objectives, including one or more of the following, unless directed otherwise by the Regional Water Board:
o Total Coliform Bacteria
o Fecal Coliform Bacteria
o E-coli
o Enterococcus
Dependent on the receiving water(s), sampling of bacterial indicators shall be sufficient to determine post-spill (after the spill) compliance with the water quality objectives and bacterial standards of the California Ocean Plan or the California Inland Surface Water Enclosed Bays, and Estuaries Plan, including the frequency and/or number of post-spill receiving water samples as may be specified in the applicable plans.

The Enrollee shall collect and analyze additional samples as required by the applicable Regional Water Board Executive Officer or designee.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 7

2.3.3. Water Quality Analysis Specifications
Spill monitoring must be representative of the monitored activity (40 Code of Federal Regulations section 122.41(j)(1)).

Sufficiently Sensitive Methods
Sample analysis must be conducted according to sufficiently sensitive test methods approved under 40 Code of Federal Regulations Part 136 for the sample analysis of pollutants. For the purposes of this General Order, a method is sufficiently sensitive when the minimum level of the analytical method approved under 40 Code of Federal Regulations Part 136 is at or below the receiving water pollutant criteria.

Environmental Laboratory Accreditation Program-Accredited Laboratories The analysis of water quality samples required per this General Order must be performed by a laboratory that has accreditation pursuant to Article 3 (commencing with section 100825) of Chapter 4 of Part 1 of Division 101 of the Health and Safety Code. (Water Code section 13176(a).) The State Water Board accredits laboratories through its Environmental Laboratory Accreditation Program (ELAP).

2.3.4. Receiving Water Sampling Locations
The Enrollee shall collect receiving water samples at the following locations.

Sampling of Flow in Drainage Conveyance System (DCS) Prior to Discharge Sampling
Location Sampling Location Description
DCS-001 A point in a drainage conveyance system before the drainage conveyance system flow discharges into a receiving water.

Receiving Surface Water Sampling (RSW)1

Sampling
Location Sampling Location Description
RSW-001
Point of Discharge
A point in the receiving water where sewage initially enters the receiving water.

RSW-001U:

Upstream of Point
of Discharge
A point in the receiving water, upstream of the point of sewage discharge, to capture ambient conditions absent of sewage discharge impacts.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 8
Sampling
Location Sampling Location Description
RSW-001D:

Downstream of
Point of Discharge
A point in the receiving water, downstream of the point of sewage discharge, where the spill material is fully mixed with the receiving water.
1 The Enrollee must use its best professional judgment to determine the upstream and downstream distances based on receiving water flow, accessibility to upstream/downstream waterbody banks, and size of visible sewage plume.

2.4. Safety and Access Exceptions
If the Enrollee encounters access restrictions or unsafe conditions that prevents its compliance with spill response requirements or monitoring requirements in this General Order, the Enrollee shall provide documentation of access restrictions and/or safety hazards in the corresponding required report.

3. REPORTING REQUIREMENTS
All reporting required in this General Order must be submitted electronically to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov), unless specified otherwise in this General Order. Electronic reporting may solely be conducted by a Legally Responsible Official or Data Submitter(s) previously designated by the Legally Responsible Official, as required in section 5.8 (Designation of Data Submitters) of this General Order.

The Enrollee shall report any information that is protected by the Homeland Security Act, by email to [email protected], with a brief explanation of the protection provided by the Homeland Security Act for the subject report to be protected from unauthorized disclosure and/or public access, and for official Water Board regulatory purposes only.

3.1. Reporting Requirements for Individual Category 1 Spill Reporting

3.1.1. Draft Spill Report for Category 1 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 1 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 9

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system;

11. Description and photographs of all discharge point(s) into the surface water;

12. Estimated spill volume that discharged to surface waters; and

13. Estimated total spill volume recovered.

3.1.2. Certified Spill Report for Category 1 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for Category 1 spills, to the online CIWQS Sanitary Sewer System Database.

Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.1.1 (Draft Spill Report for Category 1 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 10

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, lateral, pump station, etc.);

6. Description of the pipe material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion;

14. Name and type of receiving water body(s);

15. Description of the water body(s), including but not limited to:
o Observed impacts on aquatic life,
o Public closure, restricted public access, temporary restricted use, and/or posted health warnings due to spill,
o Responsible entity for closing/restricting use of water body, and o Number of days closed/restricted as a result of the spill.

16. Whether or not the spill was located within 1,000 feet of a municipal surface water intake; and

17. If water quality samples were collected, identify sample locations and the parameters the water quality samples were analyzed for. If no samples were taken, Not Applicable shall be selected.

3.1.3. Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water
For any spill in which 50,000 gallons or greater discharged into a surface water, within 45 calendar days of the spill end date, the Enrollee shall submit a Spill Technical Report to the online CIWQS Sanitary Sewer System Database. The Spill Technical Report, at minimum, must include the following information:

1. Spill causes and circumstances, including at minimum:
o Complete and detailed explanation of how and when the spill was discovered; STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 11
o Photographs illustrating the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions;
o Diagram showing the spill failure point, appearance point(s), the spill flow path, and ultimate destinations;
o Detailed description of the methodology employed, and available data used to calculate the discharge volume and, if applicable, the recovered spill volume; o Detailed description of the spill cause(s);
o Description of the pipe material, and estimated age of the pipe material, at the failure location;
o Description of the impact of the spill;
o Copy of original field crew records used to document the spill; and o Historical maintenance records for the failure location.

2. Enrollee’s response to the spill:
o Chronological narrative description of all actions taken by the Enrollee to terminate the spill;
o Explanation of how the Sewer System Management Plan Spill Emergency Response Plan was implemented to respond to and mitigate the spill; and o Final corrective action(s) completed and a schedule for planned corrective actions, including:
▪ Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable,
▪ Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences, and ▪ Necessary modifications to the Emergency Spill Response Plan to incorporate lessons learned in responding to and mitigating the spill.

3. Water Quality Monitoring, including at minimum:
o Description of all water quality sampling activities conducted; o List of pollutant and parameters monitored, sampled and analyzed; as required in section 2.3 (Receiving Water Monitoring) of this Attachment; o Laboratory results, including laboratory reports;
o Detailed location map illustrating all water quality sampling points; and o Other regulatory agencies receiving sample results (if applicable).

4. Evaluation of spill impact(s), including a description of short-term and long-term impact(s) to beneficial uses of the surface water.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 12

3.1.4. Amended Certified Spill Reports for Individual Category 1 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.2. Reporting Requirements for Individual Category 2 Spill Reporting

3.2.1. Draft Spill Report for Category 2 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 2 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system; STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 13
o Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; and

11. Estimated total spill volume recovered.

3.2.2. Certified Spill Report for Category 2 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for the Category 2 spill, to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov). Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.2.1 (Draft Spill Report for Category 2 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, pump station, etc.);

6. Description of the pipe/infrastructure material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion; and
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 14

14. Whether or not the spill was located within 1,000 feet of a municipal surface water intake.

3.2.3. Amended Certified Spill Reports for Individual Category 2 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.3. Monthly Certified Spill Reporting for Category 3 Spills The Enrollee shall report and certify all Category 3 spills to the online CIWQS Sanitary Sewer System Database within 30 calendar days after the end of the month in which the spills occurred. (For example, all Category 3 spills occurring in the month of February shall be reported and certified by March 30th). After the Legally Responsible Official certifies the spills, the online CIWQS Sanitary Sewer System Database will issue a spill event identification number for each spill.

The monthly reporting of all Category 3 spills must include the following items for each spill:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Description, photographs, and GPS coordinates where the spill originated:
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

7. Estimated total spill volume exiting the system;

8. Description and photographs of the extent of the spill and spill boundaries;

9. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry locations(s); o Estimated spill volume fully recovered from the drainage conveyance system; and STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 15
o Estimated spill volume discharged to a groundwater infiltration basis or facility, if applicable.

10. Estimated total spill volume recovered;

11. Description of the spill event destination(s), including GPS coordinates, if available, that represent the full spread and reaches of the spill;

12. Spill end date and time;

13. Description of how the spill volume estimations were calculated, including, at minimum:
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

14. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

15. System failure location (for example, main, pump station, etc.);

16. Description of the pipe/infrastructure material, and estimated age of the pipe/infrastructure material, at the failure location;

17. Description of the impact of the spill;

18. Whether or not the spill was associated with a storm event;

19. Description of spill response activities including description of immediate spill containment and cleanup efforts;

20. Description of spill corrective actions, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of the major milestones for those steps; including, at minimum:
o Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable, and
o Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences at the same spill event location, including:
▪ Adjusted schedule/method of preventive maintenance,
▪ Planned rehabilitation or replacement of sanitary sewer asset, ▪ Inspected, repaired asset(s), or replaced defective asset(s), ▪ Capital improvements,
▪ Documentation verifying immediately implemented system modifications and operating/maintenance modifications,
▪ Description of spill response activities,
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 16
▪ Spill response completion date, and
▪ Ongoing investigation efforts, and expected completion date of investigation to determine the full cause of spill;

21. Detailed narrative of investigation and investigation findings of cause of spill.

3.4. Monthly Certified Spill Reporting for Category 4 Spills The Enrollee shall report and certify the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills to the online CIWQS Sanitary Sewer System Database, within 30 calendar days after the end of the month in which the spills occurred.

3.5. Amended Certified Spill Reports for Category 3 Spills Within 90 calendar days of the certified Spill Report due date, the Enrollee may update or add additional information to a certified Spill Report by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The Enrollee shall certify the amended report.

After 90 calendar days, the Legally Responsible Official shall contact the State Water Board at [email protected] to request to amend a certified Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the 90-day timeframe for amending the certified Spill Report, as provided above.

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the Enrollee shall:
• Maintain records per section 4.4. of this Attachment; The Enrollee shall provide records upon request by State Water Board or Regional Water Board staff.
• Annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.

A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills”
If either (1) no spills occur during a calendar month or (2) only Category 4, and/or Enrollee-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the Enrollee shall certify, within 30 calendar days after STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 17
the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually (per section 3.6 of this Attachment) for the designated month.

If a spill starts in one calendar month and ends in a subsequent calendar month, and the Enrollee has no further spills of any category, in the subsequent calendar month, the Enrollee shall certify “no-spills” for the subsequent calendar month.

If the Enrollee has no spills from its systems during a calendar month, but the Enrollee voluntarily reported a spill from a private lateral or a private system, the Enrollee shall certify “no-spills” for that calendar month.

If the Enrollees has spills from its owned and/or operated laterals during a calendar month, the Enrollee shall not certify “no spills” for that calendar month.

3.8. Electronic Sanitary Sewer System Service Area Boundary Map The Legally Responsible Official shall submit, to the State Water Board, an up-to-date electronic spatial map of its sewer system service area boundaries. The map must be in accordance with section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order and the specification provided on the statewide Sanitary Sewer Systems program website. The map must include the location of wastewater treatment facility(ies) that treats the sewer system waste, if in the same sewer service boundary.

By the Effective Date of this General Order, specifications for the electronic sanitary sewer service area boundary map format will be provided on the statewide Sanitary Sewer Systems Order program website.

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)
A new Enrollee shall complete and submit its first certified Annual Report into the online CIWQS Sanitary Sewer System Database, within 30 days of obtaining a CIWQS account; Subsequent Annual Reports are due by April 1 of each year.

All enrollees shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of this General Order, for each calendar year (January 1 through December 31).

The Annual Report must be entered directly into the online CIWQS Sanitary Sewer System Database. The Enrollee’s Legally Responsible Official shall certify the Annual Report as instructed in CIWQS;
The Annual Report must address, and update as applicable, the following items:
• Population served;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 18
• Updated sewer system service area boundary map, if service area boundary has changed from original map submitted per section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order; • Number of system operation and maintenance staff:
o Entry level (less than two years of experience),
o Journey level (greater than two years of experience), o Supervisory level, and
o Managerial level;
• Number of operation and maintenance staff certified as a certified collection system operator by the California Water Environmental Association (CWEA), with:
o Corresponding number of certified collection system operator grade levels (Grade I, II, III, IV, and V);
• System information:
o Miles of system gravity and force mains,
o Number of upper and lower service laterals connected to system, o Estimated number of upper and lower laterals owned and/or operated by the Enrollee,
o Portion of laterals that is Enrollee’s responsibility, o Average age the major components of system infrastructure, o Number and age of pump stations, and
o Estimated total miles of the system pipeline not accessible for maintenance; • Name and location of the treatment plant(s) receiving sanitary sewer system’s waste;
• Name of satellite sewer system tributaries;
• Number of system’s gravity sewer above or underground crossings of water bodies throughout system;
• Number of force main (pressurized pipe) above or underground crossings of water bodies throughout system;
• Number of siphons used to convey waste throughout the sewer system; • Miles of sewer system cleaned;
• Miles of sewer system video inspected, or comparable (i.e., video closed-circuit television or alternative inspection methods);
• System Performance Evaluation as specified in section 5.11 (System Performance Analysis) of this General Order;
• Major spill causes (for example, root intrusion, grease deposition); STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 19
• System infrastructure failure points (for example, main, pump station, lateral, etc.); • Ongoing spill investigations; and
• Actions taken to address system deficiencies.

3.10. Sewer System Management Plan Audit Reporting Requirements The Enrollee shall submit its Sewer System Management Plan Audit and other pertinent audit information, in accordance with section 5.4 (Sewer System Management Plan Audits) of this General Order, to the online CIWQS Sanitary Sewer System Database by six (6) months after the end of the 3-year audit period.

If a Sewer System Management Plan Audit is not conducted as required: the Enrollee shall:
• Update the online CIWQS Sanitary Sewer System Database and select the justification for not conducting the Audit; and
• Notify its corresponding Regional Water Board (see Attachment F (Regional Water Quality Control Board Contact Information)) of the justification for the lapsed requirements.

The Enrollee’s reporting of a justification for not conducting a timely Audit does not justify non-compliance with this General Order. The Enrollee shall:
• Submit the late Audit as required in this General Order; and • Comply with subsequent Audit requirements and due dates corresponding with the original audit cycle.

3.11. Sewer System Management Plan Reporting Requirements For an Existing Enrollee previously regulated by Order 2006-0003-DWQ: Within every six (6) years after the required due date of its last Plan Update, the Legally Responsible Official shall upload and certify a local governing entity-approved Sewer System Management Plan Update to the online CIWQS Sanitary Sewer System Database. If the electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its updated Sewer System Management Plan posted on its own website.

Order 2006-0003-DWQ required each enrollee to develop its initial Sewer System Management Plan per the following schedule, with required Plan updates at a frequency of 5-years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2009 Between 100,000 and 10,000: August 2, 2009
Between 10,000 and 2,500: May 2, 2010
Less than 2,500: August 2, 2010
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 20
This Order carries forth the previously-required Plan Update schedule per Order 2006-0003-DWQ. Per the six-year Plan Update frequency required in this Order, the Enrollee shall upload and certify its first Plan Update, to the online CIWQS Sanitary Sewer System Database by the following due dates, with subsequent Plan Updates at the frequency of six years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2025 Between 100,000 and 10,000: August 2, 2025
Between 10,000 and 2,500: May 2, 2026
Less than 2,500: August 2, 2026
For a New Enrollee: Within twelve (12) months of its Application for Enrollment Approval date, the Legally Responsible Official of a new Enrollee shall upload and certify a local governing entity-approved Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database. If electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its Sewer System Management Plan posted on its own website. The due date for subsequent 6-year Plan updates, is six (6) years from the submittal due date of the new Enrollee’s first Sewer System Management Plan.

4. RECORDKEEPING REQUIREMENTS
The Enrollee shall maintain records to document compliance with the provisions of this General Order, and previous General Order 2006-0003-DWQ as applicable, for each sanitary sewer system owned, including any required records generated by an Enrollee’s contractor(s).

4.1. Recordkeeping Time Period
The Enrollee shall maintain records of documents required in this Attachment, including records collected for compliance with this General Order, and records collected in accordance with previous General Order 2006-0003-DWQ, for five (5) years.

4.2. Availability of Documents
The Enrollee shall make the records required in this General Order readily available, either electronic or hard copies, for review by Water Board staff during onsite inspections or through an information request.

4.3. Spill Reports
The Enrollee shall maintain records for each of the following spill-related events and activities:
• Spill event complaint, including but not limited to records documenting how the Enrollee responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
o Date, time, and method of notification,
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 21
o Date and time the complainant first noticed the spill, if available, o Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available,
o Complainant’s contact information, if available, and
o Final resolution of the complaint;
• Records documenting the steps and/or remedial action(s) undertaken by the Enrollee, using all available information, to comply with this General Order, and previous General Order 2006-0003-DWQ as applicable;
• Records documenting how estimate(s) of volume(s) and, if applicable, volume(s) of spill recovered were calculated;
• All California Office of Emergency Services notification records, as applicable; and • Records, in accordance with the Monitoring Requirements in this Attachment.

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills An Enrollee must maintain the following records for each individual Category 4 spill and for each individual non-Category 1 Enrollee-owned and/or operated lateral spill, and report in accordance to section 3.6 (Annual Certified Spill Reporting of Category 4 and/or Lateral Spills) of this Attachment.

Recordkeeping of Individual Category 4 Spill Information:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Description and GPS coordinates for the system location where the spill originated;

4. Did the spill reach a drainage conveyance system? If Yes:
o Description of drainage conveyance system location,
o Estimated spill volume fully recovered within the drainage conveyance system, and
o Estimated spill volume remaining within the drainage conveyance system;

5. Estimated total spill volume exiting the sanitary sewer system;

6. Spill date and start time;

7. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

8. System failure location (for example, main, pump station, etc.);

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of how the volume estimation was calculated, including, at minimum:

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 22
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, on- going spill rate at time of arrival (if applicable), and the spill end time;

11. Description of implemented system modifications and operating/maintenance modifications.

Recordkeeping of Individual Lateral Spill Information:

1. Date and time the Enrollee was notified of, or self-discovered, the spill;

2. Location of individual spill;

3. Estimated individual spill volume;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.); and

5. Description of how the volume estimations were calculated.

Total Annual Spill Information:

1. Estimated total annual spill volume;

2. Description of spill corrective actions, including at minimum:
o Local regulatory enforcement action taken against the sewer lateral owner in response to a spill, as applicable, and
o System operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill location.

4.5. Sewer System Telemetry Records
The Enrollee shall maintain the following sewer system telemetry records if used to document compliance with this General Order, and previous General Order 2006-0003-DWQ as applicable, including spill volume estimates:
• Supervisory control and data acquisition (SCADA) system(s); • Alarm system(s);
• Flow monitoring device(s) or other instrument(s) used to estimate sewage flow rates, and/or volumes;
• Computerized maintenance management system records; and • Asset management-related records.

4.6. Sewer System Management Plan Implementation Records The Enrollee shall maintain records documenting the Enrollee’s implementation of its Sewer System Management Plan, including documents supporting its Sewer System Management Plan audits, corrections, modifications, and updates to the Sewer System Management Plan.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 23

4.7. Audit Records
The Enrollee shall maintain, at minimum, the following records pertaining to its Sewer System Management Plan audits, and other internal audits:
• Completed audit documents and findings;
• Name and contact information of staff and/or consultants that conducted or involved in the audit; and
• Follow-up actions based on audit findings.

4.8. Equipment Records
The Enrollee shall maintain a log of all owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.

4.9. Work Orders
The Enrollee shall maintain record of work orders for operations and maintenance projects.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 1
ATTACHMENT E2 – SUMMARY OF NOTIFICATION, MONITORING AND REPORTING

REQUIREMENTS
This Attachment provides a summary of notification, monitoring and reporting requirements, by spill category, and for Enrollee-owned and/or operated laterals as required in Attachment E1 of this General Order, for quick reference purposes only.

Table E2-1
Spill Category 1: Spills to Surface Waters
Spill
Requirement Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of
a Category 1 spill of 1,000 gallons or greater,
discharging or threatening to discharge to surface
waters:

Notify the California Office of Emergency Services
and obtain a notification control number.

California Office
of Emergency
Services at:
(800) 852-7550
(Section 1 of
Attachment E1)
Monitoring
• Conduct spill-specific monitoring;
• Conduct water quality sampling of the receiving
water within 18 hours of initial knowledge of spill of
50,000 gallons or greater to surface waters.
(Section 2 of
Attachment E1)
Reporting
• Submit Draft Spill Report within three (3)
business days of the Enrollee’s knowledge of the
spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date;
• Submit Technical Report within 45 calendar days
after the spill end date for a Category 1 spill in
which 50,000 gallons or greater discharged to
surface waters; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.
(Section 3.1 of
Attachment E1)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 2
Table E2-2
Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters
Spill
Requirements Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of
a Category 2 spill of 1,000 gallons or greater,
discharging or threatening to discharge to waters of
the State:

Notify California Office of Emergency Services and
obtain a notification control number.

California Office of
Emergency
Services at: (800)
852-7550
(Section 1 of
Attachment E1)
Monitoring Conduct spill-specific monitoring. (Section 2 of Attachment E1)
Reporting
• Submit Draft Spill Report within three (3)
business days of the Enrollee’s knowledge of the
spill;
• Submit Certified Spill Report within 15 calendar
days of the spill end date; and
• Submit Amended Spill Report within 90 calendar
days after the spill end date.
(Section 3.2 of
Attachment E1)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 3
Table E2-3
Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters
Spill
Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring. (Section 2 of Attachment E1)
Reporting
• Submit monthly Certified Spill Report to the online
CIWQS Sanitary Sewer System Database within
30 calendars days after the end of the month in
which the spills occur; and
• Submit Amended Spill Reports within 90 calendar
days after the Certified Spill Report due date.
(Section 3.3 and 3.5 of
Attachment E1)
Table E2-4
Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters Spill
Requirements Due Method
Notification Not Applicable Not Applicable
Monitoring Conduct spill-specific monitoring. (Section 2 of Attachment E1)
Reporting
• If, during any calendar month, Category 4 spills
occur, certify monthly, the estimated total spill
volume exiting the sanitary sewer system, and the
total number of all Category 4 spills into the online
CIWQS Sanitary Sewer System Database, within
30 days after the end of the calendar month in
which the spills occurred.
• Upload and certify a report, in an acceptable digital format, of all Category 4 spills to the online CIWQS
Sanitary Sewer System Database, by February 1st
after the end of the calendar year in which the
spills occur.
(Section 3.4, 3.6, 3.7
and 4.4 of Attachment
E1)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E2 – SUMMARY TABLES FOR NOTIFICATION, December 6, 2022

MONITORING AND REPORTING REQUIREMENTS
E2 - 4
Table E2-5
Enrollee Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters Spill
Requirements Due Method
Notification
Within two (2) hours of the Enrollee’s knowledge of a
spill of 1,000 gallons or greater, from an enrollee-
owned and/or operated lateral, discharging or
threatening to discharge to waters of the State:

Notify California Office of Emergency Services and
obtain a notification control number.

Not applicable to a spill of less than 1,000 gallons.

California Office of
Emergency Services
at: (800) 852-7550

(Section 1 of Attachment
E1)
Monitoring Conduct visual monitoring. (Section 2 of Attachment E1)
Reporting
• Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not discharge to a surface water) to the online CIWQS Sanitary
Sewer System Database, by February 1st after the
end of the calendar year in which the spills occur.
• Report a lateral spill of any volume that discharges
to a surface water as a Category 1 spill.
(Sections 3.6, 3.7 and

4.4 of Attachment E1)

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT F – REGIONAL WATER QUALITY CONTROL December 6, 2022

BOARD CONTACT INFORMATION
F - 1

ATTACHMENT F – REGIONAL WATER QUALITY CONTROL BOARD CONTACT

INFORMATION
This Attachment provides a map, list of counties, and contact information to assist the Enrollee in identifying the corresponding Regional Water Quality Control Board office, for all Regional Water Board notification requirements in this General Order.

Region 1 -- North Coast Regional Water Quality Control Board:

Del Norte, Glenn, Humboldt, Lake, Marin, Mendocino, Modoc, Siskiyou, Sonoma, and Trinity counties.

[email protected] or (707) 576-2220
Region 2 -- San Francisco Bay Regional Water Quality Control Board:

Alameda, Contra Costa, San Francisco, Santa Clara (Northern most part of Morgan Hill), San Mateo, Marin, Sonoma, Napa, Solano counties.

[email protected] or (510) 622-2369
Region 3 -- Central Coast Regional Water Quality Control Board:

Santa Clara (most of Morgan Hill), San Mateo (Southern portion), Santa Cruz, San Benito, Monterey, Kern (small portions), San Luis Obispo, Santa Barbara, Ventura (Northern portion) counties.

[email protected] or (805) 549-3147
Region 4 -- Los Angeles Regional Water Quality Control Board:

Los Angeles, Ventura counties (small portions of Kern and Santa Barbara counties). [email protected] or (213) 576-6600

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT F – REGIONAL WATER QUALITY CONTROL December 6, 2022

BOARD CONTACT INFORMATION
F - 2

Region 5 -- Central Valley Regional Water Quality Control Board:

Rancho Cordova (Sacramento) Office: Colusa, Lake, Sutter, Yuba, Sierra, Nevada, Placer, Yolo, Napa, (North East), Solano (West), Sacramento, El Dorado, Amador, Calaveras, San Joaquin, Contra Costa (East), Stanislaus, Tuolumne counties.

[email protected] or (916) 464-3291 Fresno Office: Fresno, Kern, Kings, Madera, Mariposa, Merced, and Tulare counties, and small portions of San Benito and San Luis Obispo counties.

[email protected] or (559) 445-5116 Redding Office: Butte, Glen, Lassen, Modoc, Plumas, Shasta, Siskiyou, and Tehama counties.

[email protected] or (530) 224-4845 Region 6 -- Lahontan Regional Water Quality Control Board:

Lake Tahoe Office: Alpine, Modoc (East), Lassen (East side and Eagle Lake), Sierra, Nevada, Placer, El Dorado counties.

[email protected] or (530) 542-5400 Victorville Office: Mono, Inyo, Kern (East), San Bernardino, Los Angeles (North East corner) counties.

[email protected] or (760) 241-6583 Region 7 -- Colorado River Basin Regional Water Quality Control Board:

Imperial county and portions of San Bernardino, Riverside, San Diego counties.

[email protected] or (760) 346-7491
Region 8 -- Santa Ana Regional Water Quality Control Board:

Orange, Riverside, San Bernardino counties.

[email protected] or (951) 782-4130
Region 9 -- San Diego Regional Water Quality Control Board:

San Diego county and portions of Orange and Riverside counties.

[email protected] or (619) 516-1990

End of Order 2022-0103-DWQ

INTENTIONALLY LEFT BLANK

Appendix B
Public Works Department Organizational Charts

INTENTIONALLY LEFT BLANK

88224488
331111 Ca Callll Ce Cenntteerr
MMa an na ag ge err
8516
Customer
Service
Specialist
8516
Customer
Service
Specialist
Administration
Citizen Service
Center and
Administrative
Support
9 FTEs
Administration
Citizen Service
Center and
Administrative
Support
9 FTEs
311 Call Center
Representative
311 Call Center
Representative
1210
Executive
Assistant
1210
Executive
Assistant
11220077
DDiirreeccttoorr ooff
PPu ub bl li ic c WWo or rk kss

337 73 36 6
1596
617617
40344034
9171
Office
Assistant
9171
Office
Assistant
Office
Assistant

Administrative Services
Division (ASD)
Operating Budget,
Procurement, Capital
Improvement Program
(CIP) Budget,
Compliance, Grants
Management

6.63 FTEs
Administrative Services
Division (ASD)
Operating Budget,
Procurement, Capital
Improvement Program
(CIP) Budget,
Compliance, Grants
Management

6.63 FTEs
11220099
BBBuuudddgggeeettt & & & CCCIPIP IP
OOOpppeeerrraaatttiiiooonnnsss
MMMaaannnaaagggeeemmmeeennnttt
AAAnnnaaalllyyysssttt IV IV IV
22116688
PPPaaayyyroro rollllll
SSSeeervrv rviiiccceeesss
AAAdddmmmiiinnniiissstttrrraaatttiiivvveee
SSSpppeeeccciiiaaallliiisssttt
33557722
MMMaaannnaaagggeeemmmeeennnttt
AAAnnnaaalllyyysssttt II II IIIII
112 21 14 4
MMMaaannnaaagggeeemmmeeennnttt
AAAnnnaaalllyyyst st st VVV
22117700
AAAdddmmmiiinnniiissstttrrraaatttiiivvveee
Sp Sp Speeeccciiiaaallliiisssttt
22117711
MMMaaana na nagggeeemmmeeent nt nt
AAAnnnaaalllyyysssttt IIIIII
11227766
GGrraannttss
MMaannaaggeemmeenntt
MMaannaaggeemmeenntt
AAn na al ly ys st t II IIII
E
Public Works
Administrator

ASD & CSC
Building Systems and
Fleet Management
Division (BSFMD)
Facilities Maintenance
and Projects, Building
Systems, and Fleet
Services
71 FTEs
Building Systems and
Fleet Management
Division (BSFMD)
Facilities Maintenance
and Projects, Building
Systems, and Fleet
Services
71 FTEs
22337799
PPPrrrooojjjeeeccctttsss///
FFFaaacccilil ilit it itieie iesss
MMMaaain in inttteeennnaaannnccceee
PPPrrrooojjjeeecccttt MMMaaannnaaagggeeerrr
2178
Security
Ranger
2178
Security
Ranger
Security
Ranger
758758
FFFaaaccciiillliiitttiiieeesss
MMMaaaiiinnnttteeennnaaannnccceee
Co Co Coooorrrdddiiinnnaaatttooorrr
729729
PPPuuubbbllliiiccc WWWooorrrkkksss
AAAdddmmmiiinnniiist st strrraaatttooorrr
11778822
MMMaaannnaaagggeeemmmeeennnttt
AAAnnnaaalllyyysssttt III III III
11778866
WWWaaarrreeehhhooouuussseee
WWWooorrrkkkeeerrr
23782378
Bu Bu Builil ildddinin inggg SSSyyysssttteeemmmsss
CCCaaarrrpppeeennntttrrryyy///PPPaaainin inttt///
LLLoooccckkk
PPPuuubbblili liccc WWWooorrrkkksss
SSSuuupppeeerrrin in inttteeennndddeeennnttt
33992244
PPPubub ubllliiiccc WWWooorrrkkksss
CCCrrreeewww
SSSuuupppeeerrrvvviiisssooorrr III
40054005
756756
760760
763763
768768
773300
BBBuuuilil ildddinin inggg
SSSyyysssttteeemmmsss
HHHVVVAAACCC///PPPlulu lummmbbbinin inggg
PPPuuubbbllliiiccc WWWooorrrks ks ks
SSSuuupppeeerrriiinnnttteeennndddeeennnttt
22224466
MMMaaaiiinnnttteeennnaaannnccceee
RRReeepppaaaiiirrreeerrr
339 93 35 5
PPPuuubbbllliiic c c WWWooorrrkkksss
CCCrrreeewww SSSuuupppeeerrrvvviiisssooorrr
IIIIII
54005400
55991199
SSSeeennniiiooorrr HHHVVVAAACCC
TTTeeeccchhhnnniiiccciiiaaannn
739739
740740
742742
745745
746746
AAAuuutttooommmaaattteeeddd
CCCooonnntttrrrooolllsss
TTTeeeccchhhnnniiiccciiiaaannn
732732
BBBuuuiiillldddiiinnnggg SSSysys ystttemem emsss
EEEllleeeccctttrrriiicccaaalll
Pub Pub Publlliiiccc WWWooorrrksks ks
SSSuuupppeeerrriiinnnttteeennndddeeennnttt
764764
MMMaaaiiinnnttteeennnaaannnccceee
RRReeepppaaaiiirrreeerrr
37823782
39313931
752752
SSSeeeni ni niooorrr
EEEllleeeccctttrrriiiccciiiaaannn
11559944
MMMaaaiiinnnttteeennnaaannnccceee
RRReeepppaaaiiirrreeerrr
770770
782782
FFFllleeeeeettt SSSeeervrv rviiiccceeesss
FFFllleeeeeettt
MMMaaaiiinnnttteeennnaaannnccceee
SSSuuupppeeerrriiinnnttteeennndddeeennnttt
21802180
759759
MMMaaannnaaagggeeemmmeeennnttt
AAAnnnaaalllyyysssttt IIIIIIIII
778811
EEEqqquuuiiipppmmmeeennnttt
MMMeeeccchhhaaannniiiccc
Su Su Supppeeerrrvvviiisssooorrr
797797
798798
EEEqqquuuiiipppmmmeeennnttt
MMMeeeccchhhaaannniiiccc III III III
799799
807807
TTTiiirrreee RRReeepppaaaiiirrr
AAAtttttteeennndddaaannnttt
778833
EEEqqquuuiiipppmmmeeennnttt
MMMeeeccchhhaaannniiiccc
Su Su Supppeeerrrvvviiisssooorrr
35623562
793
Senior
Equipment
Mechanic
793
Senior
Equipment
Mechanic
Senior
Equipment
Mechanic
790
Assistant
Parts
Attendant
790
Assistant
Parts
Attendant
Assistant
Parts
Attendant
806
Equipment
806
Equipment Equipment
MMMeeeccchhhaaannniiiccc
Su Su Supppeeerrrvvviiisssooorrr
788788
792
Equipment
Mechanic I
792
Equipment
Mechanic I
Equipment
Mechanic I
795795
812
Garage
Attendant
812
Garage
Attendant
Garage
Attendant
853853
FFFinin inaaannnccciaia ial/l/ l/
AAAdddmmminin inisis istttrrraaatttiviv iveee
SSSuuuppppppooorrrttt
MMMaaannnaaagggeeemmmeeennnttt
AAAnnnaaaly ly lysssttt VVV
11773333
AAAdddmmmiiinnniiissstttrrraaatttiiivvveee
Sp Sp Speeeccciiiaaallliiisssttt
753753
808808
Office AssistantOffice Assistant
PainterPainter
CarpenterCarpenter
PlumberPlumber
HVAC TechnicianHVAC Technician
Angel
Electrician
Angel
Electrician
Senior Equipment
Mechanic
Senior Equipment
Mechanic
Equipment
Mechanic II
Equipment
Mechanic II
748748
SSSeeennniiiooorrr Pa Pa Paiiinnnttteeerrr
767767
750750
54205420
EEEqqquiui uipppmmmeeentnt nt
MMMeeecccha ha hani ni niccc IIIIII
811811
PPPaaarrrtttsss
TTTeeeccchni hni hniccciiiaaannn 339 90 04 4
Equipment
Mechanic III
Equipment
Mechanic III
747747
766766
786786
AAAut ut utooo SSSeeerrrvvviiiccceee
AAAtttttteeend nd ndaaant nt nt
800800
751751
23842384
Maintenance
Repairer
Maintenance
Repairer
E
773773
MMMaaaiiinnnttteeennnaaannnccceee
In In Inssspppeeeccctttooorrr
99116699
PPPW W W Cr Cr Creeewww
Su Su Supppeeerrrvvviiiso so sorrr III
Maintenance
Repairer
Maintenance
Repairer
91669166
91679167
91689168
54025402
33667766
Se Se Sennniiiooorrr
AAAdddmmmiiinnniiissstttrrraaatttiiivvveee
Sp Sp Speeeccciiiaaallliiisssttt
Engineering
Civil, Facilities, Street
Lights & Traffic
Signals, Engineering
Service, Inspections
50 FTEs
Engineering
Civil, Facilities, Street
Lights & Traffic
Signals, Engineering
Service, Inspections
50 FTEs
1247
Engineering
Services
1247
Engineering
Services
Engineering
Services
PPPrrriiinnnccciiipppaaalll
EEEnnngggiiinnneeeeeerrr
11225511
AAAdddmmmiiinnniiissstttrrraaatttiiivvveee
Sp Sp Speeeccciiiaaallliiisssttt
1259
Assistant
Engineer
1259
Assistant
Engineer
Assistant
Engineer
112 26 60 0
EEEnnngggiiinnneeeeeerrr
11226699
Pr Pr Prooogggrrraaammm
CCCoooooorrrdddiiinnnaaatttooorrr IIIIII
21172117
221 17 75 5
22119933
EEn ng gi inneee er ri in ng g
TTe ec ch hn ni ic ci ia an n
3163
Office
Assistant
3163
Office
Assistant
Office
Assistant
53785378
57095709
1266
Facilities
Principal
Engineer
1266
Facilities
Principal
Engineer
Facilities
Principal
Engineer
11227799
Se Se Sennniiiooorrr
EEEnnngggiiinnneeeeeerrriiinnnggg
TTTeeeccchhhnnniiiccciiiaaannn
333 39 99 9
32273227
52215221
52345234
5379
Office
Assistant
5379
Office
Assistant
Office
Assistant
57925792
5906
Associate
Engineer
5906
Associate
Engineer
Associate
Engineer
55008833
AAAssssssiiissstttaaannnttt CCCiiitttyyy
EEEnnngggiiinnneeeeeerrr
11223344
CCCooonnnssstttrrruuuccctttiiiooonnn
IIInnnssspppeeeccctttooorrr III
1257
Civil
1257
CivilCivil
PPPrrriiinnnccciiipppaaalll
EEEnnngggiiinnneeeeeerrr
11225555
SSStttooorrrmmmwwwaaattteeerrr
Pr Pr Prooogggrrraaammm
AAAdddmmmiiini ni nissstttrrraaatttooorrr
22111155
SSSuuurrrvvveeeyyy Pa Pa Parrrtttyyy
CCChhhiiieeefff
11442233
SSStttrere reeeettt LLLiiiggghtht htsss &&&
TTTrafraf raffffiiiccc SSSiiigggnnnaaalllsss
PPPrrriiinnnccciiipppaaalll EEEnnngggiiinnneeeeeerrr
12581258
11226633
SSSeeennniiiooorrr
EEEnnngggiiinnneeeeeerrriiinnnggg
TTTeeeccchni hni hniccciiiaaannn
12841284
12801280
5016
Assistant
Engineer
5016
Assistant
Engineer
Assistant
Engineer
EngineerEngineer
Associate EngineerAssociate Engineer
11225566
DDDeeepppuuutttyyy
DDDiiirrreeeccctttooorrr///
Ci Ci Citttyyy EEEnnngggiiinnneeeeeerrr
Project ManagerProject Manager
88223344
SSSeeennniiiooorrr OOOffffffiiiccceee
AAAssssssiiissstttaaannnttt
City Temporary
Worker
City Temporary
Worker
Senior Project
Manager
Senior Engineering
Technician
Senior Engineering
Technician
EngineerEngineer
33776622
SSSeeennniiiooorrr OOOffffffiiiccceee
AAAssssssiiissstttaaannnttt
112 26 65 5
23182318
12641264
11227755
SSSeeeni ni niooorrr PPPrrrooojjjeeecccttt
MMMaaannnaaagggeeerrr
Construction
Inspector II
Construction
Inspector II
11222233
CCCooonnnssstttrrruuuccctttiiiooonnn
IIInnnssspppeeeccctttooorrr IIIIII
11222244
CCCooonnnssstttrrruuuccctttiiiooonnn
IIInnnssspppeeeccctttooorrr IIIIII
337 72 25 5
11227788
SSe en ni io or r OOffi ffic ce e
AAs ss si is st ta an nt t
33222244
AAAssssssoooccciiiaaattteee
EEEnnngggiiinnneeeeeerrr
12711271
22226644
MMa an na ag ge em me en nt t
AAn na al ly ys st t IIV V
E
E
1222
Inspection
Supervisor
1222
Inspection
Supervisor
Inspection
Supervisor
E
E
85038503
12621262
E
Engineering TechnicianEngineering Technician
21752175
1277
Office
Assistant
1277
Office
Assistant
Office
Assistant
Resource Recovery
& Recycling (RRR)
Solid Waste
Operations and
Recycling
62 FTEs
Resource Recovery
& Recycling (RRR)
Solid Waste
Operations and
Recycling
62 FTEs
11442299
PPPuuubbbllliiiccc WWWooorrrksks ks
AAAdddmmmiiinnniiist st strrraaatttooorrr

14301430
AAAdddmmminin inisis istttrrraaatttioio ionnn
MMMaaannnaaagggeeemmmeeennnttt
An An Anaaalllyyysssttt VVV
1734
Office
Assistant
1734
Office
Assistant
Office
Assistant
34283428
EEEnnnvvviiirrrooonnnmmmeeennntttaaalll
PPPrrrooogggrrraaammmsss
MMMaaannnaaagggeeememe mennnttt
AAAnnnaaalllyyysssttt IIIVVV
55669955
PPPrrrooogggrrraaammm
CCCoooooorrrdddiiina na natttooorrr III
33993388
PPPrrrooogggrrraaammm
CCCoooooorrrdddiiinnnaaatttooorrr II II II
44004400
PPPrrrooogggrrraaammm
CCCoooooorrrdddiiinnnaaatttooorrr II II II
3431
Office
Assistant
3431
Office
Assistant
Office
Assistant
33776699
AAAdddmmmiiinnniiissstttrrraaatttiiivvveee
Sp Sp Speeeccciiiaaallliiisssttt
55008899
OOOffi ffi fficcceee
AAAssssssiiissstttaaannnttt
55669999
Pr Pr Prooogggrrraaammm
CCCoooooorrrdddiiinnnaaatttooorrr IIIIII
8259
Senior Code
Compliance
Officer
8259
Senior Code
Compliance
Officer
Senior Code
Compliance
Officer
8319
Code
Compliance
Officer
8319
Code
Compliance
Officer
Code
Compliance
Officer
38383838
SSSooolili liddd WWWaaasssttteee
OOOpppeeerrraaatttioio ionnnsss
PPPuuubbbllliiiccc WWWooorrrksks ks
SSSuuupppeeerrriiinnnttteeennndddeeennnttt
11445566
SSStttrrreeteet eet CCCllleeeaaannniiinnng/g/ g/
AAAbbbanan andddonon oneeeddd IIIttteeemmm
CCCooollllllecec ectttiiiooonnn
PPPuuubbbllliiiccc WWWooorrrkkksss
CCCrrreeewww SSSuuupppeeerrrvvviiisssooorrr IIIIII
114 44 40 0
14571457
14601460
114 46 65 5
22012201
39443944
440 03 31 1
11773366
SSSooollliiiddd WWWaaasssttteee
OOOpppeeerrratat atiiiooonsns ns
PPPuuubbbllliiiccc WWWooorrrkkksss
CCCrrreeewww SSSuuupppeeerrrvvviiisssooorrr IIIIII
114 44 48 8
117 73 38 8
17481748
17581758
17601760
17811781
334 45 52 2
35653565
440 02 29 9
40304030
559 90 08 8
559 91 14 4
11777722
SSSooollliiiddd WWWaaasssttteee
OOOpppeeeratrat ratiiiooonnnsss
PPPuuubbbllliiiccc WWWooorrrksks ks
CCCrrreeewww SSSuuupppeeerrrvvviiisssooorrr IIIIII
117 74 43 3
17471747
117 75 59 9
17671767
117 76 69 9
17711771
117 77 74 4
17791779
17801780
34513451
38373837
14451445
117 74 45 5
17551755
117 76 64 4
117 76 66 6
34903490
37973797
440 03 32 2
60366036
86168616
Maintenance Worker III
E
Maintenance Worker IIMaintenance Worker II
Maintenance Worker IIMaintenance Worker II
Holliday, TroyHolliday, Troy
Solid Waste Truck
Operator II
Holliday, Troy
Solid Waste Truck
Operator II
Solid Waste Truck
Operator II
Solid Waste Truck
Operator II
Solid Waste Truck
Operator II
Maintenance AssistantMaintenance AssistantMaintenance Assistant Maintenance Worker
III
Maintenance Worker
III
17681768
E
E
86158615
Maintenance Worker IMaintenance Worker IMaintenance Worker I E
36263626
E
117 77 70 0
85718571
33683368
Street Maintenance
(SM)
Street Maintenance,
Traffic Control, Street
Tree Administration
75 FTEs
Street Maintenance
(SM)
Street Maintenance,
Traffic Control, Street
Tree Administration
75 FTEs
88661144
PPPuuubb bllliiiccc WWWooorrrkk ksss
AAAdddmmmiiinnniiist st strrraaatttooorrr
14331433
SSStttrrreeeeeettt
MMMaaaiiinnnttteeennnaaannnccceee
PPPuuubbbllliiiccc WWWooorrrksks ks
SSSuuupppeeerrriiinnnttteeennndddeeennnttt
14461446
14501450
22002200
222 20 04 4
59925992
559 99 93 3
55999944
PPPuuubbbllliiiccc Wo Wo Worrrkkksss
CCCrrreeewww
SSSuuupppeeerrrvvviiisssooorrr III
59965996
8504
Roadway
8504
Roadway Roadway
RRReeepppaaaiiirsrs rs &&&
PPProro rojjjeeeccctttsss
PPPuuubbbllliiiccc WWWooorrrks ks ks
CCCrrreeewww SSSuuupppeeerrrvvviiisssooorrr IIIIII
14381438
114 44 41 1
114 44 47 7
14491449
114 45 53 3
14581458
114 45 59 9
14611461
114 46 66 6
17301730
21992199
334 43 33 3
14671467
TTTrrraaaffffffiiiccc CCCooonnntttrrrooolll
PPPuuubbbllliiiccc WWWooorrrks ks ks
SSSuuupppeeerrr---EEEllleeeccctttrrriiiccc
14771477
GGGrafraf raffffiiitttiii
RRReeemmmooovvvaaalll
PPPuuubbbllliiic c c WWWooorrrkkksss
CCCrrreeewww SSSuuupppeeerrrvvviiisssooorrr III
14781478
114 48 80 0
114 48 82 2
14851485
114 48 86 6
14871487
14881488
44004411
SSStttrrreeeeeettt LLLiiiggghtht ht &&&
SSSiiigggnnnaaalll
TTTeeeccchn hn hniiiccciiiaaannn
38453845
55331122
TTTrrraaaffffffiiiccc SSSiiigggnnnsss &&&
PPPaaaiiinnnttt
PPPuuubbbllliiiccc WWWooorrrkkksss
CCCrrreeewww SSSuuupppeeerrrvvviiisssooorrr IIIIII
114 47 75 5
15441544
222 20 03 3
82828282
14811481
AAAdddmmmii innniiissstttrrraaatttiiiooonnn
MMMaaannnaaagggeeemmmeeennnttt
An An Anaaalllyyysssttt IIIIIIIII
882 23 33 3
14931493
SSStttrrreeeeeettt TTTrrree eeee
AAAdddmmminin inisis istttrrraaatttioio ionnn
PPPuuubbbllliiiccc WWWooorrrks ks ks
SSSuuupppeeerrriiinnnttteeennndddeeennnttt
114 47 73 3
11551144
PPPuuubbbllliiiccc Wo Wo Worrrkkksss
CCCrrreeewww
Su Su Supppeeerrrvvviiisssooorrr II II II
15351535
15851585
222 20 07 7
PPPuuubbbllliiiccc Wo Wo Worrrkkksss
CCCrrreeewww Su Su Supppeeerrrvvviiisssooorrr
III
222 20 08 8
22092209
222 21 11 1
22132213
55227777
Pr Pr Prooogggrrraaammm
CCCoooooorrrdddiiina na natttooorrr

IIIIIIIII
83348334
11443344
SSSeeewwweeerrr
MMMaaaiiinnnttteeennnaaannnccceee &&&
SSStttooormrm rm DDDrairai rainnnsss
PPPuuubbbllliiiccc WWWooorrrksks ks
CCCrrreeewww SSSuuupppeeerrrvvviiisssooorrr IIIIII
114 43 36 6
114 43 39 9
114 44 42 2
14761476
117 75 57 7
Maintenance Worker IIIMaintenance Worker III
Office AssistantOffice Assistant
Maintenance Worker IIIMaintenance Worker III
Graffiti Removal
Maintenance Assistant
Graffiti Removal
Maintenance Assistant
Street Light & Signal
Mechanic
Street Light & Signal
Mechanic
Street Light & Signal
Repairer
Street Light & Signal
Repairer
Maintenance Worker IIIMaintenance Worker III
Maintenance Worker II Maintenance Worker II
Maintenance Worker IIIMaintenance Worker III
Maintenance Worker IIMaintenance Worker II
Maintenance Worker II Maintenance Worker II
Maintenance AssistantMaintenance Assistant
Maintenance Worker IIMaintenance Worker II
15241524
883 33 37 7
883 33 36 6
583583
14641464
40334033
Maintenance Worker I Maintenance Worker I
11445522
MMMaaaiiinnnttteeennnaaannnccceee
AAAssssssiiissstttaaannnttt
58065806
11447777
SSStttrere reeeettt LLLiiiggghtht htsss &&&
TTTrrraaaffffffiiiccc SSSiiigggnnnaaalllsss
SSSeeennniiiooorrr SSStttrrreeeeeetttllliiiggghhhttt &&& SSSiiigggnnnaaalll MMMeeech ch chaaannniiiccc
55442233
MMMaaaiiinnnttteeennnaaannnccceee
AAAssssssiiissstttaaannnttt
82818281
14631463
E
14841484
83358335
11777733
MMMaaaiiinnnttteeennnaaannnccceee
AAAssssssiiissstttaaannnttt

Appendix C
Charter Chapter 8.14 (Grease and Oil Disposal
Ordinance) of the Municipal Code

INTENTIONALLY LEFT BLANK

Appendix D
Charter Chapter 13.24 (Sewer Construction and
Maintenance) of the City Municipal Code

INTENTIONALLY LEFT BLANK

INTENTIONALLY LEFT BLANK

Appendix E
Updated Sewer Collection System Map

INTENTIONALLY LEFT BLANK

INTENTIONALLY LEFT BLANK

Appendix F
Spill Emergency Response Plan

INTENTIONALLY LEFT BLANK

City of Pasadena
Spill Emergency Response Plan
California State Resources Control Board
Prepared for:

City of Pasadena Department of Public Works
100 N. Garfield Avenue, Room N306
Pasadena, CA 91101
Contact: Richard Yee, P.E., Assistant City Engineer
October 2024

INTENTIONALLY LEFT BLANK
City of Pasadena Spill Emergency Response Plan Page i
1 Table of Contents

SECTIONS
Spill Emergency Response Plan ......................................................................................................................................................... i 1 Table of Contents.......................................................................................................................................................................... i 2 Acronyms and Abbreviations......................................................................................................................................................1 3 Definitions .....................................................................................................................................................................................3 4 Spill Emergency Response Plan ................................................................................................................................................6

4.1 Background ...........................................................................................................................................................................6

4.2 Chain of Communication ....................................................................................................................................................7

4.3 Known Collection System Problems ..................................................................................................................................8

4.4 Causes of Sewer Backups ..................................................................................................................................................8

4.5 Preventative Maintenance ..................................................................................................................................................8

4.6 Spill Detection .......................................................................................................................................................................9

4.7 Initial Spill Response ...........................................................................................................................................................9

4.7.1 Receipt of Information Regarding a Spill ...........................................................................................................9

4.7.2 Dispatch of Appropriate Personnel to Site, Site Assessment and Coordination ....................................... 10

4.8 Spill Correction and Containment ................................................................................................................................... 12

4.8.1 Responsibilities of Response Crew upon Arrival ............................................................................................ 13

4.8.2 Containment Procedures .................................................................................................................................. 14

4.8.3 Sewer Bypassing ................................................................................................................................................ 15

4.9 Recovery and Clean-Up (Mitigation) ............................................................................................................................... 15

4.10 Spill Categories .......................................................................................................................................................... 17

4.10.1 Category 1 Spill .............................................................................................................................................. 17

4.10.2 Category 2 Spill .............................................................................................................................................. 17

4.10.3 Category 3 Spill .............................................................................................................................................. 17

4.10.4 Category 4 Spill .............................................................................................................................................. 18

4.11 Spill Reporting and Tracking ..................................................................................................................................... 18

4.12 Summary of Notification, Reporting, Monitoring, and Recordkeeping Requirements .................................... 19

4.12.1 Notification and Reporting Requirements ................................................................................................. 19

4.13 Notification ................................................................................................................................................................. 24

4.14 Reporting .................................................................................................................................................................... 24

4.15 Monitoring ................................................................................................................................................................... 24

4.16 Spill-Specific Monitoring Requirements ................................................................................................................. 25

4.16.1 Spill Location and Spread ............................................................................................................................ 25

4.16.2 Spill Volume Estimation ............................................................................................................................... 25

4.17 Public Access and Warning ...................................................................................................................................... 25

4.18 Investigation and Documentation ........................................................................................................................... 25

City of Pasadena Spill Emergency Response Plan Page ii

4.18.1 Recordkeeping Requirements .................................................................................................................... 26

4.18.2 Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills ................................................ 26

4.18.3 Sewer System Telemetry Records .............................................................................................................. 27

4.18.4 Sewer System Management Plan Implementation Records .................................................................. 28

4.18.5 Audit Records ................................................................................................................................................ 28

4.18.6 Equipment Records ...................................................................................................................................... 28

4.18.7 Work Orders ................................................................................................................................................... 28

4.19 Post Spill Assessment ............................................................................................................................................... 28

4.20 Annual Review ............................................................................................................................................................ 28

4.21 Annual Report ............................................................................................................................................................ 29

4.22 Spill Response Equipment ....................................................................................................................................... 29

4.23 Training ....................................................................................................................................................................... 29

4.24 SERP Change Log ...................................................................................................................................................... 29 Appendix A......................................................................................................................................................................................... 30 Notification Requirements ...................................................................................................................................................... 30 NOTIFICATION REQUIREMENTS.............................................................................................................................................. 32 Appendix B ........................................................................................................................................................................................ 34 Reporting Requirements ......................................................................................................................................................... 34 REPORTING REQUIREMENTS ................................................................................................................................................. 35 B-1-1 Draft Spill Report for Category 1 Spills ............................................................................................................ 35 B-1-2 Certified Spill Report for Category 1 Spills ...................................................................................................... 36 B-1-3 Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water ......................................................................................................................................................... 37 B-1-4 Amended Certified Spill Reports for Individual Category 1 Spills .................................................................. 38 B-2-1 Draft Spill Report for Category 2 Spills .............................................................................................................. 38 B-2-2 Certified Spill Report for Category 2 Spills ........................................................................................................ 39 B-2-3 Amended Certified Spill Reports for Individual Category 2 Spills .................................................................. 39 Appendix C ........................................................................................................................................................................................ 44 Water Quality Monitoring Plan ................................................................................................................................................ 44 Appendix D ........................................................................................................................................................................................ 45 Spill Emergency Response Plan Change Log ....................................................................................................................... 45 Appendix E ........................................................................................................................................................................................ 48 SSMP Revised May 2019 ....................................................................................................................................................... 48 TABLES
Figure 1-1: Spill Response Chain of Communication ....................................................................................................................7 Table 1-1: Contact Numbers for Chain of Communication ...........................................................................................................8 Table 6-1: Spill Category 1: Spills to Surface Waters .................................................................................................................. 19 Table 6-2: Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters ........................ 21

City of Pasadena Spill Emergency Response Plan Page iii Table 6-3: Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters ........................................................................................................................................... 22 Table 6-4: Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters .................................. 22 Table 6-5: City Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters ...................................... 23

FIGURES
Figure 1-1: Spill Response Chain of Communication ....................................................................................................................7 Table 1-1: Contact Numbers for Chain of Communication ...........................................................................................................8 Table 6-1: Spill Category 1: Spills to Surface Waters .................................................................................................................. 19 Table 6-2: Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters ........................ 21 Table 6-3: Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters ........................................................................................................................................... 22 Table 6-4: Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters .................................. 22 Table 6-5: City Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters ...................................... 23

City of Pasadena Spill Emergency Response Plan Page 1
2 Acronyms and Abbreviations
BMP Best Management Practice
CCTV Closed-Circuit Television
CIP Capital Improvement Program
City City of Pasadena
CIWQS California Integrated Water Quality System
CWEA California Water Environment Association
EOC Emergency Operations Center
FSE Food Service Establishment
FY Fiscal year
GIS Geographic Information System
GPS Global Positioning System
Greenbook Standard Publication for Public Works and Standard Plans for Public Works I&I Inflow & Infiltration
LRO Legally Responsible Official
MACP Manhole Assessment Certification Program
NASSCO National Association of Sewer Service Companies
NPDES National Pollutant Discharge Elimination System
O&M Operation and Maintenance
OES Office of Emergency Services (aka Cal OES)
Order SWRCB Order No. 2022-0103-DWQ adopted December 6, 2022 and effective June 5, 2023 PACP Pipeline Assessment Certification Program
PD Police Department
PVC Polyvinyl chloride
RWQCB Regional Water Quality Control Board

City of Pasadena Spill Emergency Response Plan Page 2
SERP Spill Emergency Response Plan
SSMP Sewer System Management Plan
SWRCB State Water Resources Control Board
VCP Vitrified Clay Pipe
WDID Waste Discharge Identification Number
WDR Waste Discharge Requirements, also referred to as the Sanitary Sewer Systems Waste Discharge Requirements (SSSWDR)
WWTP Wastewater Treatment Plant

City of Pasadena Spill Emergency Response Plan Page 3
3 Definitions
Annual Report - A mandatory report in which the Enrollee provides a calendar-year update of its efforts to prevent spills.

California Integrated Water Quality System (CIWQS) - The statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.

Data Submitter - An individual designated and authorized by the Enrollee’s Legally Responsible Official to enter spill data into the online CIWQS Sanitary Sewer System Database. A Data Submitter does not have the authority of a Legally Responsible Official to certify reporting entered into the online CIWQS Sanitary Sewer System Database.

Enrollee - A public, private, or other non-governmental entity that has obtained approval for regulatory coverage under the General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
o greater than one (1) mile in length (each individual sanitary sewer system); o one mile or less in length where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under the Order, or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under the Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.

Exfiltration - The underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.

Governing Entity - A governing entity includes but is not limited to the following:
• A publicly elected governing board, council, or commission of a municipal agency; • A Department or Division director of a federal or state agency that is not governed by a board; • A governing board or commission of an organization or aspillciation; and • A private system owner/manager that is not governed by a board.

Lateral (including Lower and Upper Lateral) - An underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the Enrollee’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership. A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations. An upper lateral is the portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.

City of Pasadena Spill Emergency Response Plan Page 4
Legally Responsible Official - An official representative, designated by the Enrollee, with authority to sign and certify submitted information and documents required by the General Order.

Nuisance - California Water Code Section 13050, subdivision (m), defines nuisance as anything which meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property. • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal. • Occurs during, or as a result of, the treatment or disposal of wastes.

Potential to Discharge, Potential Discharge - Any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.

Receiving Water - A water of the State that receives a discharge of waste.

Sanitary sewer system - A system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.

For purpose of the Order, sanitary sewer systems include only systems owned and/or operated by the Enrollee.

Satellite Sewer System - A portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.

Sewer System Management Plan - A living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with the General Order.

Sewage - Sewage and its aspillciated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.

Spill - A discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under the General Order if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.

Spill Reporting System – Online spill reporting system that is hosted, controlled, and maintained by the State Water Board. The web address for this site is http://ciwqs.waterboards.ca.gov. This online database is maintained on a secure site and is controlled by unique usernames and passwords.

Training - In-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with the General Order.

City of Pasadena Spill Emergency Response Plan Page 5
Untreated or partially treated wastewater – Any volume of waste discharged from the sanitary sewer system upstream of a wastewater treatment plant headworks.

Waste - As defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal.

Waste Discharge Identification Number (WDID) – Number which identifies each individual sanitary sewer system enrolled under the General Order. A WDID number is assigned to each enrolled system upon an Enrollee’s approved regulatory coverage.

Waters of the State - Surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions.

Waters of the State include waters of the United States.

Waters of the United States - Surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.

Water Quality Objective - The limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance.

WDR – State Water Resources Control Board (SWRCB) Order No. 2022.0103-DWQ, known as the WASTE DISCHARGE REQUIREMENTS (WDR), which was adopted December 2, 2022 and became effective on June 5, 2023.

City of Pasadena Spill Emergency Response Plan Page 6
4 Spill Emergency Response Plan
This chapter provides an overview and summary of the City’s spill response, detection, mitigation, clean up, investigation, documentation, and reporting.

Requirements:

D.6. spill EMERGENCY RESPONSE PLAN: The Plan must include an up-to-date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; • Comply with the notification, monitoring and reporting requirements of the General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities; • Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters;
• Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in the General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.

4.1 Background
The City of Pasadena (City) Department of Public Works (DPW) operates and maintains its own sanitary collection system. The City’s sanitary collection system consists of approximately 328 miles of gravity pipelines within the City’s

23.1 square mile sewer service area. The City’s wastewater collection system conveys untreated wastewater to Los Angeles County Sanitation District’s (LACSD) trunk sewer system via 120 separate connections.

City of Pasadena Spill Emergency Response Plan Page 7
The City of Pasadena collection system is subject to regulation and permitted under the General Order WQ 2022-0103- DWQ and is identified under WDID 4SSO10416. The City will annually review and assess the effectiveness of the Spill Emergency Response Plan (SERP) and update as necessary.

Note: During the 4-year period extending from the beginning of fiscal year (FY) 2020/2021 through the end of FY 2023/2024, the City experienced 15 certified spills from within its sanitary sewer collection system.

4.2 Chain of Communication
The Order requires the chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. Figure 1-1 contains a flowchart depicting this chain of communication. Table 1-1 lists contact phone numbers for the parties included in the chain of communication.

Figure 1-1: Spill Response Chain of Communication

City of Pasadena Spill Emergency Response Plan Page 8

Table 1-1: Contact Numbers for Chain of Communication
Contact Telephone Number
City of Pasadena Main Line (626) 744-7311
Public Works Department (626) 744-3971
Street Maintenance (626) 255-0778
Police Department Dispatch Center (626) 744-4241
Active Capital Improvement Program Contractors:

Southwest Pipeline and Trenchless Corp
(Sewer Maintenance Services)
Multi-Tek (Lift Station Maintenance)

(310) 329-8717

(626) 333-2808

4.3 Known Collection System Problems
The following are currently known collection system problems within the City’s system:

1. Heavy root intrusion

2. Old and deteriorated pipes and manholes

3. Manhole base erosion

4. Manhole cover failures

5. Cracks and fractures throughout sewer mains

4.4 Causes of Sewer Backups
The following are currently known causes for sewer backups within the City’s system:

1. Heavy root intrusion

2. Pipe collapse

3. Construction material failures

4. Grease build-up

5. Structural failures

6. Concrete infiltration caused by Contractors

7. Excess debris

8. Damage due to construction

4.5 Preventative Maintenance
Refer to Section 5.2 of the City’s December 2019 SSMP (included in Appendix E herein) for the City’s preventative maintenance program.

City of Pasadena Spill Emergency Response Plan Page 9

4.6 Spill Detection
Detection of a sanitary sewer spill may occur in numerous ways:

1. If an outside party calls in to report a spill, the Collection System Crew Supervisor in the Public Works/Street Maintenance Division or his/her designee shall be notified immediately. a. If this occurs after hours, the caller is directed to the Police Dispatch who will notify the on-call personnel.

2. The Collection System Crew Supervisor, or his/her designee, upon determining that the sewer problem is the City's responsibility, will mobilize necessary City personnel and equipment to the spill location and contact the City's active sewer maintenance/capital improvement program (CIP) services contractor for emergency service, if needed.

3. If there is a risk or threat to public safety, the Collection System Crew Supervisor will notify the Public Works Superintendent, or his/her designee, to oversee the response.

4. City personnel shall attempt to limit the spread of sewage by safe and appropriate means.

5. If the spill is contained within private property and is the responsibility of the private party. City personnel shall assist the responsible private property owner in contacting a qualified contractor to remove the waste material from their property.

6. City personnel involved in the Sewer Spill Response shall forward a report of the incident to their department head. The report shall detail the cause of the spill, actions taken to limit the spill, damage caused by the spill and action taken to remove the waste.

7. The City’s Legally Responsible Official (LRO), or his/her designee, shall report the spill event to the State and Regional Water Board and other agencies if applicable (such as County Health Officer, County Environmental Health Agency, Regional Water Board, and/or State Office of Emergency Services).

Section 4.2 of this Spill Emergency Response Plan details the chain of communication for reporting spills and contact numbers for these points of contact.

Pre-planned coordination and collaboration with the City’s stormwater staff will be implemented prior, during, and after a spill event.

4.7 Initial Spill Response
The Sanitary Sewer Overflow Response Procedure presents a strategy for the City of Pasadena to mobilize labor, materials, tools and equipment to correct or repair any condition which may cause or contribute to an un-permitted discharge. The plan considers a wide range of potential system failures that could create a sanitary sewer overflow (spill) to surface waters, land or buildings.

4.7.1 Receipt of Information Regarding a Spill
A spill may be detected by system employees or by others. During regular working hours Street Maintenance is primarily responsible for receiving phone calls from the public of possible spill from the wastewater collection system. After hours, the Poli ce Department Dispatch is the primarily responsible for contacting the necessary personnel to respond to a spill. The Police Dispatch (PD) number is staffed 24 hours a day every day of the year.

1. The telephone operator receiving the call should obtain all relevant information available regarding the overflow including:

City of Pasadena Spill Emergency Response Plan Page 10 a. Time and date call was received;
b. Specific location;
c. Description of problem;
d. Time possible overflow was noticed by the caller;
e. Caller’s name and phone number;
f. Observations of the spill (e.g., odor, duration, back or front of property); and g. Other relevant information that will enable the responding personnel to quickly locate, assess, contain and stop the overflow.

If the call is received during working hours the SMIWM division telephone operator then records the spill information and creates a work order for assignment to Collection System Crew Supervisor (CSCS). If the call is received after hours and dispatched by the PD, the responding stand-by personnel will document their actions to be recorded at the first available opportunity.

2. Pump station failures are monitored and received by the CSCS. Should there be a failure; the CSCS will immediately initiate the investigation and response action.

3. Spills detected by any personnel in the course of their normal duties shall be reported immediately to the SMIWM division. Dispatch personnel should record all relevant spill information and dispatch the CSCS or appropriate crew.

4. The CSCS shall confirm the spill. Until verified, the report of a possible spill will not be referred to as a “sanitary sewer overflow or a spill.”

5. Spill incidents will be tracked on the City of Pasadena’s daily sewer maintenance sheet and then downloaded to the Collection System Sections software tracking system

4.7.2 Dispatch of Appropriate Personnel to Site, Site Assessment and Coordination
Failure of any element within the wastewater collection system that threatens to cause or causes a spill will trigger an immediate response from the CSCS, who is on call for duty, to isolate and correct the problem. Personnel and equipment shall be available to respond to any spill location. Response personnel will be dispatched to any site of a reported spill immediately.

1. Dispatching Personnel
• Dispatchers should receive notification of sewer overflows as outlined above in Section 4.7.1 entitled “Receipt of Information Regarding a Spill” and dispatch the CSCS and/or the appropriate personnel and resources as required.
• Dispatchers shall notify the appropriate manager or supervisor by any means necessary regarding spills and field personnel locations.

2. Personnel Instructions and Work Orders
• Responding crews should be dispatched by the Call Center (311) , or any means necessary. Street

City of Pasadena Spill Emergency Response Plan Page 11 Maintenance should receive instructions from sewer investigators or their supervisors regarding appropriate personnel, materials, supplies, and equipment needed. • Dispatchers shall ensure that the entire message has been received and acknowledged by the personnel who are dispatched. All standard communications procedures should be followed. All personnel being dispatched shall proceed immediately to the site of the overflow. Any delays or conflicts in assignments must be immediately reported to the CSCS for resolution. • Response personnel should in all cases report their findings, including possible damage to private and public property, to the CSCS immediately upon making their investigation. If the CSCS has not received findings from the field personnel within 30 minutes of being dispatched, the CSCS shall contact the response personnel to determine the status of the investigation. • CSCS shall refer all pertinent information to the Public Works Superintendent, including any details of the problems described by customers.

3. Additional Resources
• CSCS should receive and shall convey to appropriate parties’ requests for additional personnel, material, supplies, and equipment from crews working at the site of a spill.

4. Site Assessment
City staff shall investigate and assess the site conditions where the spill occurred using the following methods:
• Determine the Category of the spill. (Refer to Section 4.9, “Spill Categories,” for more information.) • Determine the size and extent of the spill.
• Determine any potential hazards, such as vehicle and pedestrian traffic. • Identify receiving water that may be impacted by spill. • Document and recording all pertinent information of the spill. • Implement traffic control measures as needed per the WATCH Manual. Should you need traffic or crowd control assistance, call Police dispatch at (626) 744-4501 to assist with street closure, traffic diversion, or crowd control.
• Post warning signs and block contaminated areas with yellow caution tape and/or barricades if spill poses a public threat or it has or will reach waters of the State. • If spill overflow location calls for it, the CSCS will contact the Public Works Superintendent to arrange for a partial activation of the Emergency Operations Center (EOC).

5. Preliminary Assessment of Damage to Private and Public Property • The response personnel shall not enter private property for purposes of assessing damage. It is the primary responsibility of the response personnel to contain sewage and attempt to clear any blockage in the collection system.

City of Pasadena Spill Emergency Response Plan Page 12 • Given consent by the private property owners, the Public Works Superintendent is responsible for entering private property taking the appropriate still photographs and/or video footage. If possible, pictures should be taken of all indoor and outdoor areas the spill has impacted. • Thoroughly document the nature and extent of impacts. • Available photographs are to be forwarded to Public Works Superintendent for documentation proposes.

6. Field Supervision and Inspection
• The Public Works Superintendent, who is on call, should visit the site of the spill to ensure that provisions of this SERP and other directives are met.
• The Public Works Superintendent is responsible for confirming that the spill is documented correctly, and that information conveyed to the SMIWM Division Administrator.

7. Coordination with Hazardous Material Response
• Upon arrival at the scene of a sewer spill, should a suspicious substance (e.g., oil sheen, foamy residue) be found on the ground surface, or should a suspicious odor (e.g., gasoline) not common to the sewer system be detected, the CSCS or the response personnel should immediately contact their supervisor for guidance before taking further action.
• Should the supervisor determine the need to alert the hazardous material response team, the CSCS and/or personnel on the scene shall await the arrival of the City of Pasadena’s Hazardous Materials Personnel (COPHMP) to take over the scene.
• Remember that any vehicle engine, portable pump or open flame (e.g., cigarette lighter) can provide the ignition for an explosion or fire should flammable fluids or vapors be present. Keep a safe distance and observe cautiously until assistance arrives.
• Upon arrival of the COPHMP, the CSCS and/or Collection System Personnel will take direction from the person with the lead authority of that team. Only when that authority determines it is safe and appropriate for the CSCS and/or Collection System Personnel to proceed under the SERP with the containment, clean-up activities and correction.

4.8 Spill Correction and Containment
Spills of various volumes occur from time to time in spite of concerted prevention efforts. Spills may result from blocked sewers, pipe failures, or mechanical malfunctions among other natural or man -made causes. City of Pasadena is constantly on alert and should be ready to respond upon notification and confirmation of a spill.

This section describes specific actions to be performed by the crews during a spill. The objectives of these actions are:
• To protect public health, environment and property from sewage spills and restore surrounding area back to normal as soon as possible;
• To establish perimeters and control zones with appropriate traffic cones and barricades, vehicles or use

City of Pasadena Spill Emergency Response Plan Page 13 of natural topography (e.g., hills, berms);
• To promptly notify the regulatory agency’s communication center of preliminary spill information and potential impacts;
• To contain the sewer spill to the maximum extent possible including preventing the discharge of sewage into surface waters; and
• To minimize the City of Pasadena’s exposure to any regulatory agency penalties and fines.

Under most circumstances, the City of Pasadena will handle all response actions with its own maintenance forces. They have the skills and experience to respond rapidly and in the most appropriate manner. An important issue with respect to an emergency response is to ensure that the temporary actions necessary to divert flows and mitigate or control the problem. For example, repair of a force main could require the temporary shutdown and diversion of the flow at an upstream location. If the closure is not handled properly, sewage system back-ups may create other SSO.

4.8.1 Responsibilities of Response Crew upon Arrival
It is the responsibility of the first personnel who arrive at the site of a sewer spill to protect the health and safety of the public by mitigating the impact of the overflow to the extent possible. Should the spill not be the responsibility of City of Pasadena but there is imminent danger to public health, public or private property, or to the quality of waters of the State, then prudent emergency action should be taken until the responsible party assumes responsibility and provides actions.

It should be noted that in case of emergency when public health, safety and welfare is jeopardized as declared by the Health Department, the following parties are empowered as Peace Officers to enter into private properties for immediate spill response: Police Officers, Fire Fighters, City Engineer and/or Public Works Director, and Health Officials.

Upon arrival at a spill, the response crew should do the following:
• Determine the cause of the spill, e.g. sewer line blockage, pump station mechanical or electrical failure, sewer line break, etc.;
• Once cause is determined, ownership of the problem needs to be identified. • Identify and request, if necessary, assistance or additional resources to correct and/or contain spill or to assist in the determination of its cause;
• Determine if private property is impacted. If yes, the dispatcher should be informed so that the Pasadena Health Department may be advised.
• Upon determination of private property being damage as a result of City of Pasadena collection system generated spill, the CSCS will contact a water damage clean-up contactor to execute emergency clean up at City expense.
• Take immediate steps to stop the spill, e.g. relieve pipeline blockage, manually operate pump station controls, repair pipe, etc. Extraordinary steps may be considered where spills from private property threaten public health and safety (e.g., a spill running off of private property into the public right-of-way); • If the cause is determined to be private generated spill, and the damage is limited to the property, upon request the CSCS may provide a list of contactors to assist with clean up and/or pipe clearance. • If necessary, request additional personnel, materials, supplies, or equipment from Departments of Police, Fire and Health that will expedite and minimize the impact of the overflow, such as traffic diversion, crowd control, and street closure.

City of Pasadena Spill Emergency Response Plan Page 14

4.8.2 Containment Procedures
Containment of the spill is the top priority. City staff respond initially to spill calls and perform spill to correct blockages, perform spill recovery and any necessary emergency repairs. If the City crews require additional support, they may contact the City’s active pipeline CIP contractor for emergency support. The City’s active CIP contractor varies per fiscal year. The City’s current emergency pipeline contractor and contact information are listed in this section by the City and are noted below:

Active CIP Contractor Southwest Pipeline and Trenchless Corp (310) 329-8717

The City’s crew will attempt to keep the spill in as small an area as possible. If reasonable, the crew should attempt to keep the spill in the street and out of the storm drain or other surface water bodies. To ensure the spill is contained, the crew will use the following methods:

1. Contain the spill immediately. Contain sewage on the ground using a manmade berm if applicable.

2. Isolate, contain, and/or divert sewage flow from any open channels and storm drain structures using sandbags, inflatable dams, or soil barriers. Sandbags or absorbent material can be used around the spill to collect the sewage and prevent it from spreading.

3. Block the storm drain openings or divert flow with sandbags and plastic sheets, which are available at several locations around the City. If reasonable, keep the flow contained on the street. Pay special attention to blocking storm drain inlets of any kind, both downstream and upstream of the spill. Setup traffic control per the WATCH Manual. Should you need traffic or crowd control assistance, call police dispatch at (626) 744-4501.

4. Should the spill take place in an area not normally accessible to the public (i.e. field, etc.) the crew will use any reasonable means to pool the flow in that area for recovery.

5. Capture the spill.
a. If necessary, berm flow and start pumping into the closest clear and flowing manhole. b. Contact the Public Works Superintendent at (626) 744-4808. c. Evaluate the sewer system spill rate. The most senior employee on scene will evaluate the spill rate.

6. Determine the source and/or cause of the spill (i.e., evaluate type and amount of debris, illegal activities, etc.). City staff may need to observe downstream manholes to establish the location of the cause of the spill such as a blockage.
a. If the cause is determined to be privately generated, and the damage is limited to the property, upon request the CSCS may provide a list of contactors to assist with clean up and/or pipe clearance.

7. Clear the obstruction and restore flow.
a. Restore system flow by hydro jetting, rodding, open cut excavating, or any other means to clear the blockage or failure point.
b. If necessary, City Staff should set up a hydro jetter downstream of the blockage and jet upstream from a clear manhole.
c. Capture as much of the material causing the blockage as possible. d. If unable to relieve the blockage, request immediate assistance from additional staff and appropriate equipment.
e. If still unable to clear the blockage, request immediate assistance with the establishment of bypass pumping and CCTV support to determine the problem. f. If engineering consultation is necessary, contact the Public Works Superintendent (or Public

City of Pasadena Spill Emergency Response Plan Page 15 Works Director if he/she cannot be reached). He/she shall initiate an emergency work order to the City’s on-call contractor to repair the pipe.
g. Ensure the downstream manholes are clear and flowing.

8. Should the flow be too much to be contained in the street and is identified as a danger to the public the crew will allow the flow to enter the storm drain or catch basin. The crew will plug upstream and downstream portions of impacted storm drains or catch basins and recover it from that point using a vacuum truck and/or set up a diversion to a downstream manhole.

9. If necessary, request additional personnel, materials, supplies, or equipment from Departments of Police, Fire and Health that will expedite and minimize the impact of the spill, such as traffic diversion, crowd control, and street closure.

10. Upon determining and correcting the source and/or cause of the spill, a sample of the sewage may be taken as evidence for possible analysis.

11. All sewage shall be captured and discharged into the closest clear and flowing manhole. Any contaminated materials unfit for the sewer and likely to cause blockages shall be transported to a local landfill for ultimate disposal. See Section 4.9 for treatment in dry or wet weather conditions and collection instructions.

12. Estimate volume of the spill as detailed in Section 4.16.2.

13. Notify regulatory agencies about the spill and follow any additional instructions they may have.

4.8.3 Sewer Bypassing
If the spill involves damage to or collapse of a pipeline, or the spill has been determined to be prolonged for any reason, and a by-pass is necessary:

1. By-pass action is to be administered, as soon as conditions safely allow, by City personnel at the location where the damaged pipeline occurs.

2. Place appropriate pumps and hoses to keep sewage in the sewerline. Appropriate measures shall be taken to determine the proper size and number of pumps required to effectively handle the sewage flow.

The City is considering keeping a list of contacts for equipment rental companies or contractors in case additional pumps, piping, or hoses are required to conduct a bypass. If this list is created, it will be in the change log.

3. Continuous or periodic monitoring of the by-pass pumping operation shall be implemented as required.

4. Perform repairs to the damaged sewerline as soon as conditions safely allow and as resources are available.

5. Regulatory agency issues shall be addressed in conjunction with emergency repairs.

6. If engineering consultation is necessary, the City has a list of On-Call Engineering Firms. The following includes a current list of the City’s On-Call General Civil Engineering Firms:

On-Call Engineering Firm(s) Phone
Dudek (760) 942-5147

4.9 Recovery and Clean-Up (Mitigation)

1. If the spill occurs during dry weather conditions:

City of Pasadena Spill Emergency Response Plan Page 16 a. If necessary, Police Officers should be dispatched to assist street closure, traffic diversion, or crowd control.
b. The spill site is to be secured to prevent contact by members of the public until the site has been thoroughly cleaned.
c. Once the spill has been eliminated, use rakes, brooms, and other applicable tools to scrape up and remove all solids and debris and transported for proper disposal. d. Any remaining standing sewage shall be vacuum pumped and discharged into the closest manhole (ensure it is clear and flowing).
e. Any contaminated soil shall have free standing sewage or water vacuumed up, lime applied, allowed to dry, and then removed (as necessary) by means of heavy equipment and transported to a local landfill for ultimate disposal.
f. Any contaminated structures such as streets, sidewalks, buildings, etc., shall be disinfected by pressure spraying with a 25 ppm sodium hypochlorite (liquid bleach) solution. After providing a contact time of 1 hour, the disinfected structures shall be rinsed with city water, and the wash water vacuumed and disposed of into the closest manhole (ensure it is clear and flowing). i. BEFORE PRESSURE WASHING CONTAMINATED AREA, ALL CONTAMINATED MATERIALS AND CONTAMINATED SOIL MUST BE REMOVED AND CATCH BASINS MUST BE BLOCKED.

VACUUM MUST BE READY TO PICK UP WATER FROM PRESSURE WASHING. No water, sewage, bleach, or containment materials are to be washed into the storm drain system. ii. If the spill occurred in a heavily populated area or is within 100 feet of surface water, bleach should not be used.
g. If wastewater enters the storm drain or catch basin, a vactor truck may be used to vacuum the sump at a downstream catch basin, while clean water is used to flush the curb, gutter, and pipe upstream.
h. Leave the area as clean as possible picking up rags, papers, etc. Emphasis should be placed on removing all materials that are on or around the contaminated area. i. Restore the area to its original condition, or as close as possible. j. Documentation and recording of all pertinent information of the spill shall be completed prior to leaving the site.

2. If the spill occurs during wet weather conditions:
a. If necessary, Police Officers should be dispatched to assist street closure, traffic diversion, or crowd control.
b. The spill site is to be secured to prevent contact by members of the public until the site has been thoroughly cleaned.
c. Once the spill has been eliminated, use rakes, brooms, and other applicable tools to scrape up and remove all solids and debris and transported for proper disposal. d. Any remaining standing sewage shall be vacuum pumped and discharged into the closest clear and flowing manhole.
e. Any contaminated soil shall have free standing sewage or water vacuumed up, lime applied, allowed to either dry or sit for an hour, and then removed (as necessary) by means of heavy equipment and transported to a local landfill for ultimate disposal. i. Omit lime application during heavy storm events with heavy runoff, where the surface water cannot be contained.
f. Any contaminated structures such as streets, sidewalks, buildings, etc., shall be cleaned with clean water. Avoid using bleach during wet weather as the bleach can harm the environment. g. If wastewater enters the storm drain or catch basin, a vactor truck may be used to vacuum the sump at a downstream catch basin, while clean water is used to flush the curb, gutter, and pipe

City of Pasadena Spill Emergency Response Plan Page 17 upstream.
h. Leave the area as clean as possible picking up rags, papers, etc. Emphasis should be placed on removing all materials that are on or around the contaminated area. i. Restore the area to its original condition, or as close as possible. j. Documentation and recording of all pertinent information of the spill shall be completed prior to leaving the site.
i. If a spill is caused by lack of capacity during wet weather conditions, document the storm event and forward information to the Public Works Manager.

4.10 Spill Categories
Per the Reissued WDR, there are now four (4) categories of spills. Individual spill notification, monitoring and reporting must be in accordance with the following spill categories:

4.10.1 Category 1 Spill
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under this General Order that results in a discharge to:
• A surface water, including a surface water body that contains no flow or volume of water; or • A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.

Note: Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.

A spill from a City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City will report all Category 1 spills per Appendix B, Section B-1 of this document.

4.10.2 Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill.

4.10.3 Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.

City of Pasadena Spill Emergency Response Plan Page 18

4.10.4 Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.

A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.

4.11 Spill Reporting and Tracking
Spill documentation shall be completed by the CSCS and reviewed by the Public Works Superintendent. Public Works Supervisor shall promptly notify the Street Maintenance (SM) Division Administrator when the overflow is eliminated. Information regarding the spill should include the following:

1. Indication that the spill had reached surface waters, i.e., all spills where sewage was observed running to surface waters or a drainage system where the flows were not fully captured, or there was obvious indication (e.g. sewage residue) that sewage flowed to surface waters; and

2. Indication that the spill had not reached surface waters. Guidance in characterizing these spills to include:
a. Sewage spills to covered storm drains (with no public access) where personnel verify, by inspection, that the entire volume is contained in a sump or impoundment and where complete clean-up occurs leaving no residue.
b. Preplanned or emergency maintenance jobs involving bypass pumping if access by the public to a bypass channel is restricted and subsequent complete clean -up occurs leaving no residue (Any preplanned bypass under these circumstances will not be considered spill); and c. Spills where observation or on-site evidence clearly indicates all sewage was retained on land and did not reach a surface water and where complete cleanup occurs leaving no residue.

3. Determination of the start time of the spill by one of the following methods:
a. Date and time information received and/or reported to have begun and later substantiated by the CSCS or response crew;
b. Visual observation.

4. Determination of the stop time of the spill by one of the following methods:
a. When the blockage is cleared or flow is controlled or contained; or b. The arrival time of the CSCS or response crew, if the spill stopped between the time it was reported and the time of arrival.

5. Visual observations, such as:
a. An estimation of the rate of spill in gallons per minute (GPM) by one of the following criteria:
i. Direct observations of the overflow; or

City of Pasadena Spill Emergency Response Plan Page 19 ii. Measurement of actual overflow from the sewer main.

6. Determination of the volume of the sewer overflow:
a. When the rate of spill is known, multiply the duration of the spill by the spill rate; or b. When the rate of spill is not known, investigate the surrounding area for evidence of ponding or other indications of spill volume; and
c. Refer to Section 4.16.2 for Spill Volume Estimation.

7. Photographs of the event, when possible.

8. Assessment of any damage to the exterior areas of public/private property. CSCS shall enter private property for purposes of estimating damage to structures, floor and wall coverings, and personal property.

4.12 Summary of Notification, Reporting, Monitoring, and Recordkeeping Requirements
The following tables provide a summary of notification, monitoring, reporting, and recordkeeping requirements, by spill category, and for City-owned laterals, for quick reference purposes only.

4.12.1 Notification and Reporting Requirements
Table 6-1: Spill Category 1: Spills to Surface Waters

ELEMENT REQUIREMENT METHOD
NOTIFICATION Within two (2) hours of the City’s knowledge of a Category 1 spill of 1,000 gallons or greater,
discharging or threatening to discharge to surface
waters:

Notify the California Office of Emergency Services and
obtain a notification control number.

Within 24 hours:

Notify RWQCB Region 4, Pasadena Police
Department, Pasadena Environmental Services, LA
County Public Health, and Caltrans District 7 (if
applicable).
• Call Cal OES at: (800) 852-7550
• Call or email RWQCB Region 4 at:
(213) 576-6600 or
[email protected]
• Call Pasadena Police Department
at: (626) 744-4501
• Call Pasadena Public Health at:
(626) 744-6000
• Call LA County Public Health at:
(888) 700-9995
• Call Caltrans District 7 (if
applicable) (213) 897-3656
See Appendix A.

City of Pasadena Spill Emergency Response Plan Page 20

1 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 2 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD
REPORTING • Submit Draft Spill Report within three (3)
business days of the City’s knowledge of the
spill;
• Submit Certified Spill Report within 15
calendar days of the spill end date;
• Submit Technical Report within 45 calendar
days after the spill end date for a Category 1
spill in which 50,000 gallons or greater
discharged to surface waters; and
• Submit Amended Spill Report within 90
calendar days after the spill end date.

Enter data into the online CIWQS Sanitary
Sewer System Database1
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)2.

See Appendix B, Section B-1.

WATER QUALITY

MONITORING
• Conduct spill-specific monitoring;
• Conduct water quality sampling of the
receiving water within 18 hours of initial
knowledge of spill of 50,000 gallons or
greater to surface waters.

Water quality records shall be maintained
and uploaded into CIWQS as a part of
Reporting requirement above.

RECORD

KEEPING
• Spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 4.15.

City of Pasadena Spill Emergency Response Plan Page 21 Table 6-2: Spill Category 2: Spills of 1,000 Gallons or Greater That Do Not Discharge to Surface Waters

3 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 4 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD
NOTIFICATION Within two (2) hours of the City’s knowledge of a Category 2 spill of 1,000 gallons or greater,
discharging or threatening to discharge to waters of
the State:

Notify California Office of Emergency Services and
obtain a notification control number.

Within 24 hours:

Notify RWQCB Region 4, Pasadena Police
Department, Pasadena Environmental Services, LA
County Public Health, and Caltrans District 7 (if
applicable).
• Call or email RWQCB Region 4 at:
(213) 576-6600 or
[email protected]
• Call Pasadena Police Department
at: (626) 744-4501
• Call Pasadena Public Health at:
(626) 744-6000
• Call LA County Public Health at:
(888) 700-9995
• Call Caltrans District 7 (if
applicable) (213) 897-3656
See Appendix A.

REPORTING • Submit Draft Spill Report within three (3)
business days of the City’s knowledge of the
spill;
• Submit Certified Spill Report within 15
calendar days of the spill end date; and
• Submit Amended Spill Report within 90
calendar days after the spill end date.

Enter data into the online CIWQS Sanitary
Sewer System Database3
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)4.

See Appendix B, Section B-2.

WATER QUALITY

MONITORING
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into CIWQS as a part of
Reporting requirement above.

RECORD

KEEPING
• Spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 4.15.

City of Pasadena Spill Emergency Response Plan Page 22 Table 6-3: Spill Category 3: Spills of Equal or Greater than 50 Gallons and Less than 1,000 Gallons That Does Not Discharge to Surface Waters

Table 6-4: Spill Category 4: Spills Less Than 50 Gallons That Do Not Discharge to Surface Waters

5 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 6 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected] 7 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file.

ELEMENT REQUIREMENT METHOD
NOTIFICATION Not Applicable Not Applicable
REPORTING • Submit monthly Certified Spill Report to the online CIWQS Sanitary Sewer System
Database within 30 calendars days after the
end of the month in which the spills occur;
and
• Submit Amended Spill Reports within 90
calendar days after the Certified Spill Report
due date.

Enter data into the online CIWQS
Sanitary Sewer System Database5
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)6.

See Appendix B, Sections B-3 and B-5.

WATER QUALITY

MONITORING
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into CIWQS
as a part of Reporting requirement
above.

RECORD

KEEPING
• Spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 4.15.

ELEMENT REQUIREMENT METHOD
NOTIFICATION Not Applicable Not Applicable
REPORTING • If, during any calendar month, Category 4
spills occur, certify monthly, the estimated
total spill volume exiting the sanitary sewer
system, and the total number of all Category 4
spills into the online CIWQS Sanitary Sewer
Enter data into the online CIWQS
Sanitary Sewer System Database7

City of Pasadena Spill Emergency Response Plan Page 23

Table 6-5: City Owned and/or Operated Lateral Spills That Do Not Discharge to Surface Waters

8 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD
System Database, within 30 days after the
end of the calendar month in which the spills
occurred.
• Upload and certify a report, in an acceptable
digital format, of all Category 4 spills to the
online CIWQS Sanitary Sewer System
Database, by February 1st after the end of the
calendar year in which the spills occur.
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)8.

See Appendix B, Sections B-4, B-6, and
B-7.

WATER QUALITY

MONITORING
• Conduct spill-specific monitoring; Water quality records shall be maintained and uploaded into CIWQS as
a part of Reporting requirement above.

RECORD

KEEPING
• Individual spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 4.15.

ELEMENT REQUIREMENT METHOD
NOTIFICATION Within two (2) hours of the City’s knowledge of a spill of 1,000 gallons or greater, from a City- owned and/or
operated lateral, discharging or threatening to
discharge to waters of the State:

Notify California Office of Emergency Services and
obtain a notification control number.

Within 24 hours:

Notify RWQCB Region 4, Pasadena Police Department,
Pasadena Environmental Services, LA County Public
Health, and Caltrans District 7 (if applicable).

Not applicable to a spill of less than 1,000 gallons.
• Call Cal OES at: (800) 852-7550
• Call or email RWQCB Region 4 at:
(213) 576-6600 or rb4-
[email protected]
• Call Pasadena Police
Department at: (626) 744-4501
• Call Pasadena Public Health at:
(626) 744-6000
• Call LA County Public Health at:
(888) 700-9995
• Call Caltrans District 7 (if
applicable) (213) 897-3656
See Appendix A.

City of Pasadena Spill Emergency Response Plan Page 24

4.13 Notification
Appendix A of this Spill Emergency Response Plan details the notification requirements for reporting spills.

4.14 Reporting
Appendix B of this Spill Emergency Response Plan details the reporting requirements for spills.

4.15 Monitoring
Appendix C contains the City’s Water Quality Monitoring Plan, which will be implemented immediately upon discovery of any Category 1 sewage spill in which an estimated 50,000 gallons or greater are discharged into a surface water.

9 In the event that the CIWQS database is not available, the City will notify SWRCB by phone and will fax or e-mail all required information to the RWQCB office in accordance with the time schedules identified above. In such an event, the City will submit the appropriate reports using the CIWQS database when it becomes available. A copy of all documents shall be retained in the spill file. 10 The City always has at least one LRO. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling (866) 792-4977 or emailing [email protected]

ELEMENT REQUIREMENT METHOD
REPORTING • Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not
discharge to a surface water) to the online
CIWQS Sanitary Sewer System Database, by
February 1st after the end of the calendar
year in which the spills occur.
• Report a lateral spill of any volume that
discharges to a surface water as a Category 1
spill.

Enter data into the online CIWQS
Sanitary Sewer System Database9
(http://ciwqs.waterboards.ca.gov/),
certified by the Legally Responsible
Official(s)10.

See Appendix B, Sections B-6 and B-7

WATER QUALITY

MONITORING
• Conduct visual monitoring. Water quality records shall be maintained and uploaded into CIWQS as
a part of Reporting requirement above.

RECORD

KEEPING
• Individual spill event records
• Total annual spill records
• Collection system telemetry records if relied
upon to document and/or estimate spill
Volume
Self-maintained records shall be
available during inspections or upon
request.

See Section 4.15.

City of Pasadena Spill Emergency Response Plan Page 25

4.16 Spill-Specific Monitoring Requirements

4.16.1 Spill Location and Spread
The City shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The City shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.
o For multiple appearance points of a single spill event, the points closest to the spill origin. • Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.

4.16.2 Spill Volume Estimation
To assess the approximate spill magnitude and spread, the City shall estimate the total spill volume using updated volume estimation techniques, calculations, and documentation for electronic reporting. The City utilizes direct measurement based on container volume as well as dipstick measurements. The estimated spill volume is calculated by the rate at which the manhole fills during the spill, using the volume inside the manhole. The City shall update its notification and reporting of estimated spill volume (which includes spill volume recovered) as further information is gathered during and after a spill event.

4.17 Public Access and Warning

1. Post warning signs at the site for the public to stay out of the area and block contaminated areas with yellow caution tape and/or barricades if spill poses a public threat or it has or will reach waters of the State.

2. Use traffic cones, barricades, or warning tape to limit pedestrian and vehicle traffic access to affected areas.

3. If the spill discharges into surface waters or waters of the State, closures shall occur 100 feet upstream and downstream of the spill, unless regulatory agencies provide alternative instructions. Signage shall occur at the discharge point, upstream, and downstream of the spill.

4. Warning signs and other public notices shall remain in effect until there is no further risk to public health and the environment.

5. The City’s Public Information Office through the City Manager’s Office is to communicate to the public.

4.18 Investigation and Documentation
For each spill, the City is to:

1. Determine the Category of the spill.

2. Determine the size and extent of the spill.

3. Determine any potential hazards, such as vehicle and pedestrian traffic.

4. Identify receiving water that may be impacted by spill.

City of Pasadena Spill Emergency Response Plan Page 26

5. Document and recording all pertinent information of the spill.

6. Determine the cause of the spill

7. Document findings of the investigation on the Public Works Emergency Call Out Sheet.

8. Determine what, if any, necessary repairs are needed.

9. Budget and schedule repairs, if required.

4.18.1 Recordkeeping Requirements
The City shall maintain records to document compliance with the provisions of the General Order, and previous General Order 2006-0003-DWQ as applicable, for each sanitary sewer system owned, including any required records generated by a City’s contractor(s).

4.18.1.1 Recordkeeping Time Period
The City shall maintain records of this Spill Emergency Response Plan for five (5) years.

4.18.1.2 Availability of Documents
The City shall make the records readily available, either electronic or hard copies, for review by Water Board staff during onsite inspections or through an information request.

4.18.1.3 Spill Reports
The City shall maintain records for each of the following spill-related events and activities:
• Spill event complaint, including but not limited to records documenting how the City responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
a. Date, time, and method of notification,
b. Date and time the complainant first noticed the spill, if available, c. Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available, d. Complainant’s contact information, if available, and e. Final resolution of the complaint;
• Records documenting the steps and/or remedial action(s) undertaken by the City, using all available information
• Records documenting how estimate(s) of volume(s) and, if applicable, volume(s) of spill recovered were calculated;
• All California Office of Emergency Services notification records, as applicable; and • Records, in accordance with the Monitoring Requirements, once developed.

4.18.2 Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills
The City must maintain the following records for each individual Category 4 spill and for each individual non-Category 1 City-owned and/or operated lateral spill, and report in accordance with Appendix B section B-6 (Annual Certified Spill Reporting of Category 4 and/or Lateral Spills).

City of Pasadena Spill Emergency Response Plan Page 27

4.18.2.1 Recordkeeping of Individual Category 4 Spill Information:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Description and GPS coordinates for the system location where the spill originated;

4. Did the spill reach a drainage conveyance system? If Yes:
a. Description of drainage conveyance system location,
b. Estimated spill volume fully recovered within the drainage conveyance system, and c. Estimated spill volume remaining within the drainage conveyance system;

5. Estimated total spill volume exiting the sanitary sewer system;

6. Spill date and start time;

7. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

8. System failure location (for example, main, pump station, etc.);

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of how the volume estimation was calculated, including, at minimum:
a. The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and
b. The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

11. Description of implemented system modifications and operating/maintenance modifications.

4.18.2.2 Recordkeeping of Individual Lateral Spill Information:

1. Date and time the City was notified of, or self-discovered, the spill;

2. Location of individual spill;

3. Estimated individual spill volume;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.); and

5. Description of how the volume estimations were calculated.

4.18.2.3 Total Annual Spill Information:

1. Estimated total annual spill volume;

2. Description of spill corrective actions, including at minimum:
a. Local regulatory enforcement action taken against the sewer lateral owner in response to a spill, as applicable, and
b. System operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill location.

4.18.3 Sewer System Telemetry Records
The City shall maintain the following sewer system telemetry records if used to document compliance with the General Order, and previous General Order 2006-0003-DWQ as applicable, including spill volume estimates:
• Supervisory control and data acquisition (SCADA) system(s);

City of Pasadena Spill Emergency Response Plan Page 28 • Alarm system(s);
• Flow monitoring device(s) or other instrument(s) used to estimate sewage flow rates, and/or volumes; • Computerized maintenance management system records; and • Asset management-related records.

4.18.4 Sewer System Management Plan Implementation Records The City shall maintain records documenting the City’s implementation of its Sewer System Management Plan, including documents supporting its Sewer System Management Plan audits, corrections, modifications, and updates to the Sewer System Management Plan.

4.18.5 Audit Records
The City shall maintain, at minimum, the following records pertaining to its Sewer System Management Plan audits, which includes this Spill Emergency Response Plan, and other internal audits:
• Completed audit documents and findings;
• Name and contact information of staff and/or consultants that conducted or involved in the audit; and • Follow-up actions based on audit findings.

4.18.6 Equipment Records
The City shall maintain a log of all owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.

4.18.7 Work Orders
The City shall maintain record of work orders for operations and maintenance projects.

4.19 Post Spill Assessment
After a spill, the City is to assess their spill response. The City is to analyze:
• The cause of the spill;
• Average and maximum response time;
• Percent of total spill volume contained or returned to sewer; • Compliance with notification, monitoring, and reporting requirements; • Public Notification; and
• What repairs were performed.

This assessment is to be used to update the Spill Emergency Response Plan as necessary and to conduct additional training where needed.

4.20 Annual Review
The City is to annually review and assess the effectiveness of the Spill Emergency Response Plan. Updates to the Spill Emergency Response Plan should be made as necessary based on this review.

City of Pasadena Spill Emergency Response Plan Page 29

4.21 Annual Report
Section B-8 of Appendix B of this Spill Emergency Response Plan details the reporting requirements for the City’s Annual Report. The City shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of the General Order, for each calendar year (January 1 through December 31).

4.22 Spill Response Equipment
The following is the City’s list of spill response equipment:
a. Vactor Combination Hydro Jet/Vacuum Truck
b. Vacuum/Jetter Truck
c. Sewer snake machine
d. Trash pumps 4” and 6”
e. 1500-ft of 6” lay flat hose
f. 100-ft of Suction hose
g. 1-Backhoe
h. 2-Dump Trucks
i. 3-Service Trucks
j. 100-gal Big Orange degreaser
k. SDR 35 Sewer Pipe – 4”, 6”, 8”
l. Flexible Fernco Coupling
m. Video camera
n. 30 sacks of white Lime powder
o. Absorbing sock
p. 2 transfer pumps with a 3” suction and discharge capability q. 4 of the 3” X 100’ discharge hose
r. 2 of the 3” X 20’ suction hose.

4.23 Training
Training is conducted through the City of Pasadena’s Public Works Department. Staff and contractors are appropriately trained on the Spill Emergency Response Plan procedures and practice drills. Sewer staff and any contractors utilized for cleaning, CCTV inspection and/or emergency response are trained every two months. The City implements training with staff from sewer and storm to know their part in responding to spills and recognizing areas at risk, develop strategies in containing and preventing spills, and reduce risks of cross contamination.

4.24 SERP Change Log
A change log for the SERP is included in Appendix D. The City will use this log to document changes and maintain up to date information about the SERP.

City of Pasadena Spill Emergency Response Plan Page 30 Appendix A
Notification Requirements

Appendix A: Notification Requirements

City of Pasadena Spill Emergency Response Plan Page 32

NOTIFICATION REQUIREMENTS
A-1 Notification of Spills of 1,000 Galloons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the City shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The City has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.

The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from a City-owned and/or operated laterals, to a water of the State.

The control number must be referred to in all communication, oral and written.

A-2 Spill Notification Information
The City shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services; • Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
o Brief narrative of the spill event, and
o Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks; • Name and phone number of contact person on-scene;
• Date and time the City was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.

A-3 Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the City certifies the spill report in the online CIWQS Sanitary Sewer System Database, the City shall provide updates to the California Office of Emergency Services regarding substantial changes to:

Appendix A: Notification Requirements

City of Pasadena Spill Emergency Response Plan Page 33 • Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and • Additional impact(s) to the receiving water(s) and beneficial uses.

Appendix B
Reporting Requirements

Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 35

REPORTING REQUIREMENTS
All reporting required in the General Order must be submitted electronically to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov), unless specified otherwise in the General Order. Electronic reporting may solely be conducted by a Legally Responsible Official or Data Submitter(s) previously designated by the Legally Responsible Official, as required in section 5.8 (Designation of Data Submitters) of the General Order.

The City shall report any information that is protected by the Homeland Security Act, by email to [email protected], with a brief explanation of the protection provided by the Homeland Security Act for the subject report to be protected from unauthorized disclosure and/or public access, and for official Water Board regulatory purposes only.

B-1 Reporting Requirements for Individual Category 1 Spill Reporting
B-1-1 Draft Spill Report for Category 1 Spills
Within three (3) business days of the City’s knowledge of a Category 1 spill, the City shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the City was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the City notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated; a. If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
a. Description of the drainage conveyance system transporting the spill; b. Photographs of the drainage conveyance system entry location(s); c. Estimated spill volume fully recovered from the drainage conveyance system; d. Estimated spill volume remaining within the drainage conveyance system;

11. Description and photographs of all discharge point(s) into the surface water;

12. Estimated spill volume that discharged to surface waters; and

13. Estimated total spill volume recovered.

Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 36 B-1-2 Certified Spill Report for Category 1 Spills
Within 15 calendar days of the spill end date, the City shall submit a Certified Spill Report for Category 1 spills, to the online CIWQS Sanitary Sewer System Database.

Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section B-1.1 (Draft Spill Report for Category 1 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
a. The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and
b. The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, lateral, pump station, etc.);

6. Description of the pipe material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was aspillciated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion;

14. Name and type of receiving water body(s);

15. Description of the water body(s), including but not limited to:
a. Observed impacts on aquatic life,
b. Public closure, restricted public access, temporary restricted use, and/or posted health warnings due to spill,
c. Responsible entity for closing/restricting use of water body, and d. Number of days closed/restricted as a result of the spill.

16. Whether or not the spill was located within 1,000 feet of a municipal surface water intake; and

17. If water quality samples were collected, identify sample locations and the parameters the water quality samples were analyzed for. If no samples were taken, Not Applicable shall be selected.

Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 37 B-1-3 Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water
For any spill in which 50,000 gallons or greater discharged into a surface water, within 45 calendar days of the spill end date, the City shall submit a Spill Technical Report to the online CIWQS Sanitary Sewer System Database. The Spill Technical Report, at minimum, must include the following information:

1. Spill causes and circumstances, including at minimum:
a. Complete and detailed explanation of how and when the spill was discovered; b. Photographs illustrating the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions; c. Diagram showing the spill failure point, appearance point(s), the spill flow path, and ultimate destinations;
d. Detailed description of the methodology employed, and available data used to calculate the discharge volume and, if applicable, the recovered spill volume; e. Detailed description of the spill cause(s);
f. Description of the pipe material, and estimated age of the pipe material, at the failure location; g. Description of the impact of the spill;
h. Copy of original field crew records used to document the spill; and i. Historical maintenance records for the failure location.

2. City’s response to the spill:
a. Chronological narrative description of all actions taken by the City to terminate the spill; b. Explanation of how the Sewer System Management Plan Spill Emergency Response Plan was implemented to respond to and mitigate the spill; and
c. Final corrective action(s) completed and a schedule for planned corrective actions, including:
i. Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable,
ii. Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences, and
iii. Necessary modifications to the Emergency Spill Response Plan to incorporate lespillns learned in responding to and mitigating the spill.

3. Water Quality Monitoring, including at minimum:
a. Description of all water quality sampling activities conducted; b. List of pollutant and parameters monitored, sampled and analyzed; as required in Water Quality Monitoring Plan, once developed;
c. Laboratory results, including laboratory reports;
d. Detailed location map illustrating all water quality sampling points; and e. Other regulatory agencies receiving sample results (if applicable).

4. Evaluation of spill impact(s), including a description of short-term and long-term impact(s) to beneficial uses of the surface water.

Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 38 B-1-4 Amended Certified Spill Reports for Individual Category 1 Spills The City shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the City shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

B-2 Reporting Requirements for Individual Category 2 Spill Reporting
B-2-1 Draft Spill Report for Category 2 Spills
Within three (3) business days of the City’s knowledge of a Category 2 spill, the City shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the City was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the City notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;

If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
a. Description of the drainage conveyance system transporting the spill; b. Photographs of the drainage conveyance system entry location(s); c. Estimated spill volume fully recovered from the drainage conveyance system; d. Estimated spill volume remaining within the drainage conveyance system; e. Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; and

11. Estimated total spill volume recovered.

Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 39 B-2-2 Certified Spill Report for Category 2 Spills
Within 15 calendar days of the spill end date, the City shall submit a Certified Spill Report for the Category 2 spill, to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov). Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section B-2.1 (Draft Spill Report for Category 2 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
a. The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and
b. The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, pump station, etc.);

6. Description of the pipe/infrastructure material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was aspillciated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion; and

14. Whether or not the spill was located within 1,000 feet of a municipal surface water intake.

B-2-3 Amended Certified Spill Reports for Individual Category 2 Spills The City shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the City shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 40 B-3 Monthly Certified Spill Reporting for Category 3 Spills The City shall report and certify all Category 3 spills to the online CIWQS Sanitary Sewer System Database within 30 calendar days after the end of the month in which the spills occurred. (For example, all Category 3 spills occurring in the month of February shall be reported and certified by March 30th). After the Legally Responsible Official certifies the spills, the online CIWQS Sanitary Sewer System Database will issue a spill event identification number for each spill.

The monthly reporting of all Category 3 spills must include the following items for each spill:

1. Contact information: Name and telephone number of City contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the City was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Description, photographs, and GPS coordinates where the spill originated:
a. If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

7. Estimated total spill volume exiting the system;

8. Description and photographs of the extent of the spill and spill boundaries;

9. Did the spill reach a drainage conveyance system? If Yes:
a. Description of the drainage conveyance system transporting the spill; b. Photographs of the drainage conveyance system entry locations(s); c. Estimated spill volume fully recovered from the drainage conveyance system; and d. Estimated spill volume discharged to a groundwater infiltration basis or facility, if applicable.

10. Estimated total spill volume recovered;

11. Description of the spill event destination(s), including GPS coordinates, if available, that represent the full spread and reaches of the spill;

12. Spill end date and time;

13. Description of how the spill volume estimations were calculated, including, at minimum:
a. The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and
b. The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

14. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

15. System failure location (for example, main, pump station, etc.);

16. Description of the pipe/infrastructure material, and estimated age of the pipe/infrastructure material, at the failure location;

17. Description of the impact of the spill;

18. Whether or not the spill was aspillciated with a storm event;

19. Description of spill response activities including description of immediate spill containment and cleanup efforts;

20. Description of spill corrective actions, including steps planned or taken to reduce, eliminate, and prevent Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 41 reoccurrence of the spill, and a schedule of the major milestones for those steps; including, at minimum:
a. Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable, and
b. Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences at the same spill event location, including:
i. Adjusted schedule/method of preventive maintenance,
ii. Planned rehabilitation or replacement of sanitary sewer asset, iii. Inspected, repaired asset(s), or replaced defective asset(s), iv. Capital improvements,
v. Documentation verifying immediately implemented system modifications and operating/maintenance modifications,
vi. Description of spill response activities,
vii. Spill response completion date, and
viii. Ongoing investigation efforts, and expected completion date of investigation to determine the full cause of spill;

21. Detailed narrative of investigation and investigation findings of cause of spill.

B-4 Monthly Certified Spill Reporting for Category 4 Spills The City shall report and certify the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills to the online CIWQS Sanitary Sewer System Database, within 30 calendar days after the end of the month in which the spills occurred.

B-5 Amended Certified Spill Reports for Category 3 Spills Within 90 calendar days of the certified Spill Report due date, the City may update or add additional information to a certified Spill Report by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The City shall certify the amended report.

After 90 calendar days, the Legally Responsible Official shall contact the State Water Board at [email protected] to request to amend a certified Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the 90-day timeframe for amending the certified Spill Report, as provided above.

B-6 Annual Certified Spill Reporting of Category 4 and/or Lateral Spills
For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the City shall:
• Maintain records per section 1.15; The City shall provide records upon request by State Water Board or Regional Water Board staff.
• Annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.

Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 42 A spill from an City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City shall report all Category 1 spills per Water Quality Monitoring Plan, once developed.

B-7 Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills”
If either (1) no spills occur during a calendar month or (2) only Category 4, and/or City-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the City shall certify, within 30 calendar days after the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually (per Water Quality Monitoring Plan, once developed) for the designated month.

If a spill starts in one calendar month and ends in a subsequent calendar month, and the City has no further spills of any category, in the subsequent calendar month, the City shall certify “no-spills” for the subsequent calendar month.

If the City has no spills from its systems during a calendar month, but the City voluntarily reported a spill from a private lateral or a private system, the City shall certify “no-spills” for that calendar month.

If the City has spills from its owned and/or operated laterals during a calendar month, the City shall not certify “no spills” for that calendar month.

B-8 Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)
The City shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of the General Order, for each calendar year (January 1 through December 31).

The Annual Report must be entered directly into the online CIWQS Sanitary Sewer System Database. The City’s Legally Responsible Official shall certify the Annual Report as instructed in CIWQS; The Annual Report must address, and update as applicable, the following items:
• Population served;
• Updated sewer system service area boundary map, if service area boundary has changed from original map submitted per section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of the General Order;
• Number of system operation and maintenance staff:
o Entry level (less than two years of experience),
o Journey level (greater than two years of experience), o Supervisory level, and
o Managerial level;
• Number of operation and maintenance staff certified as a certified collection system operator by the California Water Environmental Aspillciation (CWEA), with:
o Corresponding number of certified collection system operator grade levels (Grade I, II, III, IV, and Appendix B: Reporting Requirements

City of Pasadena Spill Emergency Response Plan Page 43 V);
• System information:
o Miles of system gravity and force mains,
o Number of upper and lower service laterals connected to system, o Estimated number of upper and lower laterals owned and/or operated by the City, o Portion of laterals that is City’s responsibility,
o Average age the major components of system infrastructure, o Number and age of pump stations, and
o Estimated total miles of the system pipeline not accessible for maintenance; • Name and location of the treatment plant(s) receiving sanitary sewer system’s waste; • Name of satellite sewer system tributaries;
• Number of system’s gravity sewer above or underground crossings of water bodies throughout system; • Number of force main (pressurized pipe) above or underground crossings of water bodies throughout system;
• Number of siphons used to convey waste throughout the sewer system; • Miles of sewer system cleaned;
• Miles of sewer system video inspected, or comparable (i.e., video closed-circuit television or alternative inspection methods);
• System Performance Evaluation as specified in section 5.11 (System Performance Analysis) of the General Order;
• Major spill causes (for example, root intrusion, grease deposition); • System infrastructure failure points (for example, main, pump station, lateral, etc.); • Ongoing spill investigations; and
• Actions taken to address system deficiencies.

Appendix C
Water Quality Monitoring Plan

FINAL

City of Pasadena
Sanitary Sewer Spill Water Quality
Monitoring Plan
MAY 2025
Prepared for:

CITY OF PASADENA
Public Works
100 North Garfield Avenue
Pasadena, CA 91101
Contact: James Tong
Prepared by:

605 Third Street
Encinitas, California 92024
Contact: Shannon Brown, PE

Printed on 30% post-consumer recycled material.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 i MAY 2025

Table of Contents
SECTION PAGE NO.
1 Introduction .......................................................................................................................................................... 1 2 Background .......................................................................................................................................................... 2

2.1 Spill Monitoring Plan Framework ........................................................................................................... 2

2.2 Geographic Setting ................................................................................................................................. 4

2.3 Pasadena Assets .................................................................................................................................... 6

2.4 Potential Monitoring Locations .............................................................................................................. 6

2.5 Water Quality Sample Constituents ...................................................................................................... 8 3 Monitoring Site Selection ................................................................................................................................. 11

3.1 Downstream Monitoring Sites ............................................................................................................ 11

3.2 Upstream Monitoring Sites ................................................................................................................. 12 4 Monitoring Procedures Overview ..................................................................................................................... 14

4.1 Manual Sample Collection .................................................................................................................. 14

4.2 Flow Rate Estimation via Float Velocity Method ................................................................................ 15

4.3 Monitoring Equipment ......................................................................................................................... 15

4.4 Water Quality Laboratory .................................................................................................................... 16 5 Site Access and Safety Considerations ........................................................................................................... 17 6 Site Descriptions ............................................................................................................................................... 17

6.1 Receiving Water Monitoring Locations............................................................................................... 17

6.1.1 ARROYO SECO_US ................................................................................................................. 18

6.1.2 ARROYO SECO_DS ................................................................................................................. 20

6.1.3 RUBIO WASH_US.................................................................................................................... 22

6.1.4 EATON WASH_US1 ................................................................................................................. 24

6.1.5 EATON WASH_US2 ................................................................................................................. 26

6.1.6 EATON WASH_DS1 ................................................................................................................ 28

6.2 Drainage Conveyance Monitoring Locations ..................................................................................... 30

6.2.1 ALHAMBRA WASH_DC1 ......................................................................................................... 31

6.2.2 ALHAMBRA WASH_DC2 ......................................................................................................... 33

6.2.3 ALHAMBRA WASH_DC3 ......................................................................................................... 35

6.2.4 ALHAMBRA WASH_DC4 ......................................................................................................... 37

6.2.5 ALHAMBRA WASH_DC5 ......................................................................................................... 39

6.2.6 ALHMAMBRA WASH_DC6 ...................................................................................................... 41

6.2.7 ALHAMBRA WASH_DC7 ......................................................................................................... 43

6.2.8 RUBIO WASH_DC1 ................................................................................................................. 45

SANITARY SEWER SPILL MONITORING PLAN

15275.05 ii MAY 2025

6.2.9 RUBIO WASH_DC2 ................................................................................................................. 47

6.2.10 RUBIO WASH_DC3 ................................................................................................................. 49

6.2.11 RUBIO WASH_DC4 ................................................................................................................. 51

6.2.12 EATON WASH_DC1 ................................................................................................................ 53

6.2.13 EATON WASH_DC2 ................................................................................................................ 55

6.2.14 EATON WASH_DC3 ................................................................................................................ 57

6.2.15 EATON WASH_DC4 ................................................................................................................ 59 7 Summary ........................................................................................................................................................... 61 8 References ........................................................................................................................................................ 62 Appendix A ....................................................................................................................................................................... 64 Appendix B ...................................................................................................................................................................... 66 Appendix C ...................................................................................................................................................................... 68

SANITARY SEWER SPILL MONITORING PLAN

15275.05 iii MAY 2025

INTENTIONALLY LEFT BLANK

SANITARY SEWER SPILL MONITORING PLAN

15275.05 1 MAY 2025

1 Introduction
The Sanitary Sewer System Spill water Quality Monitoring Plan (Monitoring Plan) provides technical information for water quality monitoring locations and techniques that may be used to characterize the relative impacts to the receiving water quality in the event of a sanitary sewer spill (spill) within the City of Pasadena (City) service area. In the event of a spill, it is assumed response actions identified in the City’s Spill Emergency Response Plan and Sewer System Management Plan (SSMP) will be implemented to protect public health and the environment. This plan covers details on monitoring receiving water quality separate from the emergency response and cleanup efforts.

Recent updates to the waste discharge requirements general order for sanitary sewer systems 1 (WDR) require timely implementation of spill-specific notification, monitoring, and reporting tasks for spill events that exceed certain volume thresholds. In the event of a spill >50,000 gallons, the WDR outlines monitoring requirements generally aligned to estimate spill location and spread as well as receiving water conditions to support impact analysis documented in a spill report. This Monitoring Plan provides technical and procedural details to allow for rapid implementation of water quality monitoring activities that may be used to characterize the extent and magnitude of potential impacts related to a spill. These water quality activities are based on standard procedures implemented as part of municipal and industrial water quality monitoring programs.

Surface runoff in the geographical area served by City flows into both City of Pasadena storm drains and Los Angeles County Flood Control District (LACFCD) storm drains. Receiving water quality monitoring has been conducted in these drains as part of various compliance, special study , and third-party efforts over the past two decades. The suite of previously monitored locations provides a resource for efficient identification of logistically feasible locations for City spill response monitoring. Wet and/or dry weather water quality samples have been collected at these monitored locations. These data may be comparable to samples collected as part of a spill response or for other purposes.

The City operates and maintains a wide array of sanitary sewer piping, manholes, pump stations, force mains, and other associated infrastructure. The location of major collection system assets and components, watershed configuration, drainage characteristics, safety, and accessibility were used to select a distributed array of water quality monitoring locations that may be used during a spill response event. In the event of a spill , it is recommended that City staff evaluate the spill size, location, duration, volume, and ambient weather conditions to develop a focused water quality monitoring strategy and monitoring plan.

The overall purpose of this document is to provide the following information:
• A geographic overview of City assets
• Representative water quality monitoring locations that may be used for a spill response or guide identification of alternative locations in the future
• Site description and access information for the representative water quality monitoring locations

1 Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems. Order WQ 2022-0103-DWQ

SANITARY SEWER SPILL MONITORING PLAN

15275.05 2 MAY 2025

• A summary of water quality monitoring methods and protocols The following sections provide background information and sample collection methodology for the proposed monitoring locations. Detailed site descriptions for each proposed monitoring location are provided in Section 6. 2 Background
Wastewater and stormwater 2 discharges from the City are regulated through state issued permits that define management, monitoring, and reporting requirements. These WDRs are created based on evaluation of the City’s threat to water quality and quality of the receiving waters.

The City operates under the Coastal Watersheds of Los Angeles County Phase I municipal separate storm sewer system (MS4) permit (MS4 Permit) and is part of the Upper Los Angeles River Watershed Management Area Group.

Under the MS4 Permit, the City monitors storm drain outfalls during wet- and dry-weather to detect non-storm water discharges to its MS4 and monitoring water quality during storm events as part of the Coordinated Integrated Monitoring Program (CIMP). Non-stormwater discharges may come from many sources including, but not limited to, illicit connections, illicit discharges, and sewage spills. This document pertains to water quality as a result of a sewage spill, however, monitoring results from the regional CIMP are useful for comparison with spill event samples.

2.1 Spill Monitoring Plan Framework
The WDR Attachment E1 (Appendix A) includes spill notification, spill location and spread observations, monitoring, and reporting requirements. Implementation requirements for these elements are summarized below.

Notification
For any spill that discharges in or on any waters of the State, the discharger is to notify the California Office of Emergency Services (Cal OES) as soon as possible but no later than two (2) hours after: a) knowledge of the spill; and b) notification can be provided without interfering with cleanup/emergency measures.

Cal OES Warning Center: (800) 852-7550
Location and Spread Observations
In the event of a spill, the discharger visually assess es the spill locations and extent using photography, global positioning system (GPS) and other tools such as a measuring devices to quantify the spill area/length and depth.

Key documentation includes:
• The system location where spill originated
o For multiple appearance points of a single spill event, the points closest to the spill origin.

2 National Pollutant Discharge Elimination System (NPDES) Waste Discharge Requirements (WDRs) for Municipal Separate Storm Sewer System (MS4) Discharges within the Coastal Watersheds of Los Angeles County, Except those Discharges originating from the City of Long Beach MS4 Order R4-2012-0175-A01 NPDES NO. CAS004001

SANITARY SEWER SPILL MONITORING PLAN

15275.05 3 MAY 2025

• Drainage conveyance system spill entry locations
• Locations where spill discharges to receiving water
• Extent of spread and locations of cleanup
Additionally, the discharger needs to estimate the spill volume using appropriate techniques, calculations, and documentation for electronic reporting.

Following spill volume estimation, the discharger is required to perform visual observations for spills that discharge to receiving waters. Key documentation includes:
• Estimated spill travel time to receiving water
o For spills entering a drainage conveyance system, this includes travel time from entry into the drainage conveyance system to receiving water discharge • Spill volume entering receiving water
• Photography:
o Waterbody bank erosion (if applicable)
o Floating matter
o Surface sheen (oil and grease)
o Discoloration of receiving waters
Monitoring
A spill estimated at 50,000 gallons or greater discharged to receiving water requires the discharger to perform water quality monitoring. Monitoring must be conducted no later than 18-hours after the discharger’s knowledge of a potential discharge to a surface water.

Daily s amples must be collected at the discharge point to the receiving water and at location s upstream and downstream of the discharge point. If the spill entered the receiving water from a drainage conveyance, a sample must be taken from within the conveyance as well, given spill material is still present. Upstream samples should be taken at a sufficient distance from the discharge point to capture ambient conditions absent of spill material. The upstream sample point is ideally collected where the receiving water enters the City boundary, at a point where the water quality is unaffected by discharges from the City. Downstream sample point must be taken far enough from the discharge point where the spill material is fully mixed with the receiving water. The downstream sample point should be evaluated for conditions in the receiving water at the time spill such as flow rate and velocity. If a spill occurs during a large rain event, then mixing will occur more quickly (and less distance downstream from the spill) than during dry weather or low flow conditions. The furthest downstream point before the receiving water leaves the City boundary will yield the best mixing condition.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 4 MAY 2025

Once collected, the samples must be submitted to a certified laboratory in a timely manner for analysis of ammonia and fecal indicator bacteria.

Reporting
Electronic reporting to the California Integrated Water Quality System (CIWQS)3 is required for all spills. For spills greater than 50,000 gallons and discharged to receiving waters, a Spill Technical Report is required within 45 days of the spill end date. The Spill Technical Report must contain the following:
• Spill causes and circumstances
• Discharger’s response to spill
• Water quality monitoring information
• Evaluation of spill impacts, including short- and long-term impact(s) to beneficial uses of surface waters Spill report information is then used by Regional Water Quality Control Board staff to evaluate the relative impact to the environment and to form the basis of potential spill-specific enforcement actions.

2.2 Geographic Setting
The City’s sewer service area includes 23.1 square miles. Major water bodies within the City include three primary runoff drainages with seasonal and permanent water impoundments (Figure 1).

The City drains to the south and ranges in elevation from approximately 1,800 feet above mean sea level (AMSL) to 466 feet AMSL5. The major drainage areas within the City include Arroyo Seco, Alhambra Wash, Rubio Wash, and Eaton Wash. Generally, these drainage areas flow north to south. Arroyo Seco and Eaton Wash have surface water channels within the City whereas the portions of the City that are in Alhambra and Rubio Wash do not.

3 https://ciwqs.waterboards.ca.gov/

SANITARY SEWER SPILL MONITORING PLAN

15275.05 5 MAY 2025

SANITARY SEWER SPILL MONITORING PLAN

15275.05 6 MAY 2025

2.3 Pasadena Assets
The City operates and maintains a sanitary sewer collection system that provides service to approximately 133,560 residents4. The City operates and maintains approximately 328 miles of gravity pipelines and 41 miles of force mains, which serve the majority of the City’s 23.1 square mile City limits and conveys an annual average flow of approximately 14 million gallons per day 5. The City’s sanitary collection system conveys these untreated flows to the Los Angeles County Sanitation District’s (LACSD) trunk sewer system. A summary of the City’s pump stations and force mains are presented below in Figure 2. In general, these assets constitute infrastructure that have potential to contribute to spills that may require a monitoring program and were used in the sample location assessment presented in Section 3.

2.4 Potential Monitoring Locations
Within the context of the City’s geography and sewer system assets, a suite of p otential spill monitoring locations were identified for this Monitoring Plan. The monitoring locations were selected to provide core representation of locations where critical sewer infrastructure has potential for a large spill event, adjacent stormwater conveyance and other infrastructure has potential to be impacted by a large spill event, and during/post-event monitoring at the selected locations may provide reasonable capacity to characterize impacts to water quality from a spill. While specific monitoring locations have been identified, the City may at any time change these locations because of access constraints and/or changes in operations.

A spill that impacts water quality is likely to be conveyed through the MS4 before reaching the receiving water, however, in limited situations a spill immediately adjacent to a receiving water may discharge directly to the water body. The WDR defines four distinct monitoring location types (Figure 3):
• Flow in MS4 or non-sewer infrastructure conveyance(s) prior to the discharge point • Receiving Surface Water (RSW) discharge point
• RSW upstream of the discharge point
• RSW downstream of the discharge point
The location of a spill event will determine t he exact monitoring location (s) needed to be sampled based on discharge point to the receiving water . However, the core monitoring locations and methods documented in this Monitoring Plan allow for rapid identification and implementation of a monitoring program that will both meet the requirements of the WDR and provide critical information that may be used to inform the required Spill Technical Report impact analysis. Accordingly, this Monitoring Plan only identifies potential upstream and downstream monitoring locations. Monitoring in the MS4 or non -sewer infrastructure conveyance(s) as well as RSW discharge point monitoring locations will be assessed by the City on a spill-by-spill basis.

4 U.S. Census Bureau. 2023.
5 City of Pasadena Sewer System Management Plan Report, 2019

SANITARY SEWER SPILL MONITORING PLAN

15275.05 7 MAY 2025

SANITARY SEWER SPILL MONITORING PLAN

15275.05 8 MAY 2025

2.5 Water Quality Sample Constituents
Attachment E of the WDRs list two required constituents to monitor in surface water impacted by a sewer spill. All water quality samples are required to measure the concentration of ammonia and the concentration of the appropriate bacterial indicator(s) per the applicable Basin Plan water quality objectives. For Pasadena, the Los Angeles Regional Board's Basin Plan6 identifies E-coli and Enterococcus as the fecal indicator bacteria for the region. Table 1 identifies the required constituents to sample for and information on the specific requirements for each sample method.

6 Water Quality Control Plan Basin Plan for the Coastal Watersheds of Los Angeles and Ventura Counties Basin Plan for the Coastal Watersheds of Los Angeles and Ventura Counties | Los Angeles Regional Water Quality Control Board (ca.gov)

SANITARY SEWER SPILL MONITORING PLAN

15275.05 9 MAY 2025

Figure 3. Sewer Spill Water Quality Monitoring Locations

SANITARY SEWER SPILL MONITORING PLAN

15275.05 10 MAY 2025

Table 1. Water Quality Sample Collection, Preservation, and Analysis Constituent Analytical Method Minimum Sample
Volume Sample Container Preservation Method Maximum Holding Time Ammonia EPA 350.1 250 mL Plastic Sulfuric Acid, 4°Celcius 28 days E. Coli SM-9223-B 100 mL Plastic Sodium thiosulfate,
4°Celcius 6 hours
Enterococcus Enterolert 100 mL Plastic Sodium thiosulfate, 4°Celcius 6 hours

SANITARY SEWER SPILL MONITORING PLAN

15275.05 11 MAY 2025

3 Monitoring Site Selection
A desktop analysis was conducted using the location of known City assets, watershed boundaries, and the City boundary in geographic information system (GIS). The analysis resulted in a suite of potential monitoring locations that were prioritized based on the following characteristics:
• Proximity to City sewer assets
• Ability for a spill to flow to a receiving water
• Potential for monitoring site to serve as a reference point for the City The monitoring sites included in this Monitoring Plan were chosen based on their ability to characterize water quality conditions before and after being influenced by a spill. Due to the transient nature of a spill, only specific upstream and downstream monitoring locations are identified at this time.

3.1 Downstream Monitoring Sites
Downstream monitoring locations are defined in the WDR as being “a point in the receiving water, downstream of the point of sewage discharge, where the spill is fully mixed with the receiving water.” Receiving waters in the City are defined by four separate watersheds: Arroyo Seco, Alhambra Wash, Rubio Wash, and Eaton Wash. For Arroyo Seco, only a single downstream point is necessary to monitor a spill since this watershed has a single above ground channel leaving the City boundary. This point represents where a spill that discharged into Arroyo Seco upstream either from a storm drain outfall or direct surface runoff is fully mixed with the receiving water.

Alhambra and Rubio Wash do not have surface level receiving waters within the City boundary. Runoff in Alhambra and Rubio Wash leaves the City boundary through 11 underground discharge points that connect into the adjacent jurisdictions’ storm drains. Since the City does not have control over the water quality in the storm drain once it leaves the City , downstream drainage conveyance monitoring sites have been established for these 11 underground discharge points at the closest manhole before runoff leaves city limits. These specific locations act as the most downstream points in Alhambra and Rubio Wash to monitor water quality in the event of a sewer spill upstream within the washes.

Eaton Wash has both a downstream receiving water monitoring location as well as multiple drainage conveyance monitoring locations. Due to the geography and jurisdictional boundaries along the southeastern edge of the City, There are portions of Eaton Wash that receive runoff (or a spill) from the City but the open channel of the wash itself is outside the City boundary. Therefore, a receiving water monitoring location was placed at the most downstream point of the open channel portion of Eaton Wash before l eaving the City, and downstream drainage conveyance monitoring locations were placed on the storm drains that leave the City south of the surface water monitoring point.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 12 MAY 2025

3.2 Upstream Monitoring Sites
The WDR defines an upstream monitoring site as being “a point in the receiving w ater, upstream of the point of sewer discharge, to capture ambient conditions absent of sewage discharge impacts.” For the Monitoring Plan, upstream monitoring locations were selected for each of the major drain age areas upstream of City sewer assets and storm drain outfalls. Upstream monitoring locations were also selected based on proximity to major roads and ease of access to the receiving water. Upstream monitoring locations presented in this Monitoring Plan are intended to be used for any spill that occurs downstream in the specified drainage area. Specific monitoring locations have been identified in Arroyo Seco, Rubio Wash, and Eaton Wash. Since the Alhambra Wash originates within the City, the upstream monitoring location will be assessed by the City on a case by case basis as there may not be an upstream flow in the storm drain depending on the timing of the spill.

A suite of core monitoring locations derived from this assessment are presented below in Figure 4. More detailed site-specific fact sheets for these locations area presented in Section 6. In the event of a spill, it is recommended that City staff evaluate the spill location with respect to the sample locations presented in Figure 4 to determine an appropriate upstream and downstream monitoring location. Selection of drainage conveyance and discharge point monitoring location should be identified by visually inspecting the spill pattern on the ground surface and identifying if any material has flowed into the MS4 and/or directly discharged into a surface water.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 13 MAY 2025

SANITARY SEWER SPILL MONITORING PLAN

15275.05 14 MAY 2025

4 Monitoring Procedures Overview
In general, the core monitoring locations are located in open stormwater channels and use methodology derived from industry standard water quality sample collection procedures. Standard methods include documenting site conditions and sample characteristics (color, odor, turbidity, etc.) , flow estimations, and other observations and activities that may be used to evaluate water quality or sample collection specifics.

Water quality monitoring requires the coordination of both field personnel and the selected analytical laboratory during monitoring events, as well as proper management of field and laboratory data. Monitoring event preparation includes allocating sample collection equipment, bottles, labels, and chain of custodies (CoCs). Activities to be performed during a monitoring event include the proper collection and handling of water samples and the submission of samples within laboratory holding times. In addition to the field effort involved with monitoring, such as travel, parking, sample collection and handling, additional effort is required after a monitoring event to ensure the proper management of field and analytical data.

Monitoring locations should be assessed for representative conditions prior to collecting a water sample. For example, collection of a sample should target flowing water in riverine locations and avoid stagnant pools . If a monitoring location does not offer such conditions, a sample may still be collected, but field notes shall include observations such as pooled water, presence of algae (and volume estimates), and other biological conditions. It is recommended that City staff review available sample collection and handling resources [e.g., Caltrans Monitoring Guidance Manual 7 (Caltrans 2020), NPDES Stormwater Sampling Guidance Document 8 (EPA 1992)] prior to a monitoring event, and/or consult a water quality professional, as necessary. A brief synopsis of the key monitoring and flow measurement protocol are provided below in Section 4.1 and 4.2.

4.1 Manual Sample Collection
Manual sample collection involves filling a container from a runoff stream or receiving waterbody. This can be done either by collecting the sample directly into laboratory -supplied bottles or by using an intermediate container to pour the sample into the lab bottles. Note that samples for certain constituents, including oil and grease, bacteria, and low -level mercury, are best if collected directly into the appropriate sample bottle without use of an intermediate container to reduce the potential for cross contamination. However, in certain situations such as high flow it may not be feasible to collect directly into the sample bottle, therefore an intermediate container can be used to collect and transfer the sample.

An intermediate sample container can be an unused laboratory bottle.

Sample collection can be assisted by a device that is extended to dip, lower, or reach the sample container into the waterbody. This method is

7 https://dot.ca.gov/-/media/dot-media/programs/environmental-analysis/documents/env/ctws-ot-20-350-04-01-monitoring- guidance-manual-a11y.pdf
8 https://www3.epa.gov/npdes/pubs/owm0093.pdf
Manual sample collection methods
using an intermediate container

SANITARY SEWER SPILL MONITORING PLAN

15275.05 15 MAY 2025

ordinarily used when the waterbody is difficult to access, and an intermediate container must be lowered into the water or reached across some distance to collect a sample. Additionally, the use of an intermediate container when filling pre-preserved laboratory bottles can be beneficial because it eliminates the risk of accidentally rinsing out the preservative while filling the bottles.

4.2 Flow Rate Estimation via Float Velocity Method
To use this method, first it is necessary to determine the cross-sectional area of the flow at a specific location. This requires estimation of flow depth and width, as well as a general assessment of the bottom channel shape such as rectangular or trapezoidal. Then field technicians mark two places on the bank of the channel at least five feet apart (using a longer distance between the two points will result in a more accurate flow measurement).

When this setup is complete, the flow can be measured by releasing a buoyant object into the channel upstream of the two marked points on the bank and measuring the time it takes to flow between them. The rate of flow can be calculated by the following formula:

Equation 1:

𝐹𝑙𝑜𝑤 𝑅𝑎𝑡𝑒 (𝑓𝑡3
𝑠𝑒𝑐⁄ ) = 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝐵𝑒𝑡𝑤𝑒𝑒𝑛 𝑃𝑜𝑖𝑛𝑡𝑠 (𝑓𝑡)
𝑇𝑟𝑎𝑣𝑒𝑟𝑠𝑒 𝑇𝑖𝑚𝑒 (𝑠𝑒𝑐) × 𝐶𝑟𝑜𝑠𝑠 𝑆𝑒𝑐𝑡𝑖𝑜𝑛𝑎𝑙 𝐴𝑟𝑒𝑎 (𝑓𝑡2)
There are some disadvantages to the float method: (1) measuring the cross-sectional area of a large water body can be difficult, and inaccuracies in this value will affect the accuracy of the flow measurement, and (2) the method measures velocity of flow only at the surface of a channel, which may not be representative of the velocity throughout the entire cross section of flow. Therefore, when using this method, multiple measurements should be taken at different points across the channel and the results averaged.

The accuracy of the float method is improved by using an object that has a density similar to water and that tends to float totally submerged. For example, oranges are good floating objects for this method because they are easy to see, remain buoyant, and are environmentally safe.

The float method should only be used if a mechanical flow meter is not available. Mechanical flow meters, such as a turbine flow meter or ultrasonic flow meter, will provide more accurate flow velocity at a given point. The Cross- sectional area will still need to be estimated to calculate a flow rate , however, flow meters help reduce the time, effort, and potential inaccuracy introduced by the manual float method.

4.3 Monitoring Equipment
The use of proper monitoring equipment is necessary to ensure the safety of personnel collecting the samples and integrity of the samples themselves. Contact with raw sewage can have acute and long-term impacts to human health that can be avoided using the proper personal protective equipment (PPE). Additionally, contamination of the sample may occur if inappropriate equipment or handling methods are used.

Recommended PPE for receiving water monitoring includes:
• Disposable latex gloves

SANITARY SEWER SPILL MONITORING PLAN

15275.05 16 MAY 2025

• Close-toed shoes, long pants, and long sleeve shirt
• Optional Tyvek suit or similar if contact with the spill material is likely • Eye protection (glasses or goggles) and/or face shield • Disinfecting wipes and hand sanitizer
To be ready for a spill, it is recommended the following list of equipment is procured and stored in a centralized location. Store enough sampling bottles to be able to collect up to four days of samples at each of the four monitoring location types described in Section 2.4. In the event that any of the bottles are lost or compromised, it is recommended to also have a full set of backup bottles. • Four days’ worth of sample bottles plus one days’ worth of back-up includes:
o 40 100 mL plastic bottles with Sodium thiosulfate preservative o 20 250 mL plastic bottles with Sulfuric acid preservative • Sample bottle labels and water-resistant marker
• CoC sheets (Appendix B)
• Visual observation log (Appendix C)
• Cooler for ice to keep samples at or below 4°C
• Grab pole to safely reach into drains as needed
For additional resources, the Caltrans and/or EPA guidance documents referenced at the beginning of this section can serve as a general guide for collecting water quality samples. While these documents focus on stormwater sampling, the safety protocols and handling methods apply to the receiving water monitoring discussed in this plan.

4.4 Water Quality Laboratory
Monitoring samples must be taken to an Environmental Laboratory Accreditation Program (ELAP) certified laboratory for analysis. The City of Pasadena Water Quality Laboratory and Los Angeles Dept. of Water & Power, Water Quality Laboratory located in Pasadena are classified as non-public certified laboratories. The City should consider creating a purchase order with either of these laboratories to process monitoring results in case of a spill.

Otherwise, the closest public ELAP certified laboratory is in South Pasadena:
• EMSL Analytical, Inc. (public). Located at 520 Mission Street, South Pasadena.

In the event that the local laboratories are unavailable during a spill event , consult the State Water Resources Control Board ELAP webpage9 for a mapping tool that shows the closest laboratories and their contact information.

9 https://www.waterboards.ca.gov/drinking_water/certlic/labs/

SANITARY SEWER SPILL MONITORING PLAN

15275.05 17 MAY 2025

5 Site Access and Safety Considerations
Access to monitoring locations must be assessed for safety considerations during each visit. Field staff should use caution at all times in evaluating roadway safety and right of way conditions. Specific safety concerns relating to surface water sampling includes potential slip, trip, and fall hazards, biological hazards, and swift water. To reduce safety risks, grab poles should be considered for sample collection at difficult to reach monitoring locations.

Unlike receiving water monitoring locations, drainage conveyance monitoring locations are often located in the street and require some level of traffic control based on the type of road and time of day. Compounding this issue is that spills frequently occur during rain events which make for even more dangerous road conditions. Monitoring locations presented in this plan are intended to represent the most optimal location from a data standpoint, but not necessarily from a personnel safety standpoint. At all times, personnel safety should be the top priority, and monitoring should be delayed or relocated if safety is potentially compromised.

Site-specific access and safety considerations are presented in the following section. 6 Site Descriptions
Site-specific location, access, and monitoring considerations are presented on the following site information sheets.

For the purposes of this document, the core monitoring locations are identified using the name of the drainage and a designation of the monitoring location as upstream (US) or downstream (DS) or drainage conveyance (DC) . A numeric value is added to monitoring location name where there is two or more of the same type within the same drainage area.

As described in Section 3, spill monitoring locations are identified based on location and size of the spill, specific weather and hydrology conditions, and specific management considerations. A geographic reference for all sample location is provided in Figure 3.

6.1 Receiving Water Monitoring Locations
The following sections identify pre-determined US and DS surface water monitoring locations. Since we do not know the location of a potential future spill, the discharge point into the receiving water as well as the DC monitoring point are unknown. Therefore, specific locations for these samples cannot be pre-planned. US and DS monitoring locations can be pre -planned since they are best taken from where a water body enters a city before being influenced by runoff or non-stormwater discharges (i.e. sewer spills) and where a water body leaves a city before it comingles and is influenced by downstream conditions that are outside of the city’s control. Section 6.1.1 through

6.1.6 detail US and DS locations that fit these criteria as closely as possible. However, in certain situations, like with Alhambra and Rubio Wash and the eastern edge of Eaton Wash, there is not a receiving water present (channelized into storm drains). Therefore, DC monitoring locations as shown in Section 6.2.1 through 6.2.15 have been identified where the City may collect samples to categorize water in the storm drain before it crosses over the City boundary.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 18 MAY 2025

6.1.1 ARROYO SECO_US
Monitoring Location ID ARROYO SECO_US
Receiving Water Name Arroyo Seco
Monitoring Location Type Receiving Surface Water (RSW) Upstream Address /Intersection Gabrielino Trail 300 feet north of Explorer Rd Latitude/Longitude 34. 203 241N , -118. 1664 46W

Site Description:

The ARROYO SECO_US site is located in the Arroyo Seco Channel 300 feet north of the Explorer Rd bridge. The site is used to characterize the upstream condition of Arroyo Seco before comingling with storm drain outfalls. The site is a natural stream at the mouth of an undeveloped canyon and may experience high flows during storm events.

Access Notes:

Access to the site is by foot from the Gabrielino Trail or from Explorer Rd. There is a large dirt parking lot at the Explorer Rd bridge, however, access might by restricted by the adjacent Jet Propulsion Laboratory. Access to Gabrielino Trail is by foot from the trailhead at the end of W.

Altadena Dr.

Sampling Notes:

The trail provides access to the creek for sample collection using the grab pole or other non-contact method.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 19 MAY 2025

Google Earth Site Photos
Parking Along Explorer Rd to the left and
Gabrielino Trail to the right

Arroyo Seco at the upstream monitoring
location

SANITARY SEWER SPILL MONITORING PLAN

15275.05 20 MAY 2025

6.1.2 ARROYO SECO_DS
Monitoring Location ID ARROYO SECO_DS
Receiving Water Name Arroyo Seco
Monitoring Location Type Receiving Surface Water (RSW) Downstream Address /Intersection SW of S San Rafael Ave & S Arroyo Blvd Latitude/Longitude 34. 125137N , -118. 166203W

Site Description:

The ARROYO SECO_DS site is located in the Arroyo Seco Channel 0.06 miles west of S Arroyo Rd.

The site is located downstream of the confluence with Central Drain No. 3 as well as all other stormwater conveyances that drain the City. ARROYO SECO_DS is used as the RSW downstream sampling location for the ARROYO SECO_US upstream sewer spill monitoring location.

Access Notes:

Access to the site is from an unpaved road past the Saint Clair Equestrian parking lot that leads to bridge access to Arroyo Seco Channel . The unpaved road intersects with San Pascual Ave approximately 0. 14 miles south of the sampling bridge location . Driving on the unpaved road should be avoided if conditions are slippery during wet weather.

Sampling Notes:

The bridge provides access to the channel for sample collection using the grab pole. Samples collected at this location are used to characterize the downstream condition from any spill that occurs within the Arroyo Seco Channel.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 21 MAY 2025

Site Photos
S San Rafael Ave looking south at sampling
point from the bridge

Edge of parking lot of Saint Clair Equestrian
looking north at drain access bridge

SANITARY SEWER SPILL MONITORING PLAN

15275.05 22 MAY 2025

6.1.3 RUBIO WASH_US
Monitoring Location ID RUBIO WASH _US
Receiving Water Name Rubio Wash
Monitoring Location Type Receiving Surface Water (RSW) Upstream Address /Intersection E Woodbury Rd SE of Santa Rosa Ave Latitude/Longitude 34.180604 N, --118.140239 W

Site Description:

The RUBIO WASH_US site is located where the Rubio Wash enters the City and discharges into a channel east of the intersection of Santa Rosa Ave & E Woodbury Rd . The site is used to characterize the upstream condition in Rubio Wash before it comingles with stormwater outfalls south of the City boundary.

Access Notes:

The site is located at the manhole at the intersection of Santa Rosa Ave & E Woodbury Rd. Manhole access will likely require the setup of traffic cones to ensure safety during sampling.

Sampling Notes:

Collect samples using a grab pole or from the surface through the manhole . Observe the drain to ensure samples are collected from flowing pools.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 23 MAY 2025

Site Photos
View looking north at the sampling point along
E Woodbury Rd

View looking east at the sampling point along E
Woodbury Rd

SANITARY SEWER SPILL MONITORING PLAN

15275.05 24 MAY 2025

6.1.4 EATON WASH_US1
Monitoring Location ID EATON WASH_US 1
Receiving Water Name Eaton Wash
Monitoring Location Type Receiving Surface Water (RSW) Upstream Address /Intersection Mt. Wilson Toll Rd & Pinecrest Dr Latitude/Longitude 34.191672 N, -118.104471 W
Contact Information Name: Kevin Regan
Affiliation: LA County Parks and Recreation
Phone/Email: [email protected]

Site Description:

EATON WASH_US site is located in Eaton Canyon Park at the northern edge of the City 0.3 miles down Mt. Wilson Toll Rd from the intersection with Pinecrest Dr. The site is used to characterize the upstream condition in Eaton Wash before it comingles with stormwater outfalls from Altadena as well Pasadena.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 25 MAY 2025

Access Notes:

Access to the site is by foot from Pinecrest Dr. Follow Mt. Wilson Toll Rd north until you reach the bottom of the canyon, then cross the bridge and access the open water from the east side of the wash. Sample location should be determined on-site based on access to flowing water.

Sampling Notes:

Collect samples from the drain’s banks by hand or using a grab pole.

Site Photos
View looking north at the access point to the
Eaton Wash sampling point off of Mt. Wilson
Toll Rd.

Mt. Wilson Toll Rd. Turnoff from Pinecrest Dr.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 26 MAY 2025

6.1.5 EATON WASH_US2
Monitoring Location ID EATON WASH_US 2
Receiving Water Name Eaton Wash
Monitoring Location Type Receiving Surface Water (RSW) Upstream Address /Intersection SE of N Altadena Dr & E Washington Blvd Latitude/Longitude 34.16856389 N, -118.094597222 W
Contact Information Affiliation: Los Angeles County Public Works Department
Phone/Email: (626) 798 -6761

Site Description:

EATON WASH_US2 site is located in the above ground channel downstream of the Eaton Canyon Reservoir, maintained by Los Angeles County Public Works Department . This site should be considered a secondary monitoring location EATON WASH_US1 because it is downstream of a few City storm drains along Eaton Wash upstream of the reservoir. However, if EATON WASH_US1 is inaccessible, EATON WASH_DS2 maybe be a suitable alternative.

Access Notes:

The access gate to the channel is located along E Washington Blvd, adjacent to the building Fastest Labs of Pasadena. Access to the site is gated and may require coordination with Los Angeles County Public Works Department at (626) 798-6761.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 27 MAY 2025

Sampling Notes:

Collect samples from the drain’s banks using a grab pole.

Site Photos
View of driveway access point on E Washington Blvd from Woodlyn Rd

SANITARY SEWER SPILL MONITORING PLAN

15275.05 28 MAY 2025

6.1.6 EATON WASH_DS1
Monitoring Location ID EATON WASH_DS1
Receiving Water Name Eaton Wash
Monitoring Location Type Receiving Surface Water (RSW) Downstream Address /Intersection E Del Mar Blvd SW of S Kinneloa Ave Latitude/Longitude 34. 142026 N, -118. 086098 W

Site Description:

The EATON WASH_DS1 site is located in the open channel at the most downstream location before leaving the City boundary. Due to the topography and jurisdictional boundaries, there are portions of the City that drain into Eaton Wash downstream from this location and are monitored through separate downstream drainage conveyance monitoring locations. Unless there is a spill in the area tributary to these downstream drainage conveyance monitoring locations, this location is used as the primary RSW downstream monitoring location for the two Eaton Wash upstream monitoring location.

Access Notes:

Access to the site is from the adjacent right of way along E. Del Mar Blvd.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 29 MAY 2025

Sampling Notes:

Collect samples by lowering a sample container over the bridge using a grab pole.

Site Photos
View looking south at Eaton Wash bridge
sampling point from E. Del Mar Blvd.

View looking north at E. Del Mar Blvd. from
edge of Eaton Wash.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 30 MAY 2025

6.2 Drainage Conveyance Monitoring Locations
Portions of Pasadena, specifically in Alhambra and Rubio Wash and the far eastern edge of the City along Eaton Wash, do not have a receiving water location for the purpose of spill monitoring within city limits. Therefore, the City should consider identifying downstream drainage conveyance monitoring locations (typically in a storm drain manhole or inlet) just upstream of where the storm drains cross the City boundary. Monitoring at these locations will provide valuable data on the impact from spill that made its way into the storm before being influenced by runoff or other non-stormwater discharges from a downstream jurisdiction that’s outside of the City’s control.

The following sections provide overview maps and street view images for the downstream drainage conveyance system monitoring locations identified for Alhambra Wash, Rubio Wash and Eaton Wash . In Eaton Wash, the majority of the area can be monitored at the designed downstream monitoring location (EATON WASH_DS1) except for the eastern most edge of the drainage area that flows into Arcadia and East Pasadena. In this area, a designated drainage conveyance monitoring point is located in the storm drain at the intersection of Foothill Blvd and Michillinda Ave. In Alhambra and Rubio Wash, drainage conveyance monitoring locations have been identified for each storm drain that crosses the City boundary.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 31 MAY 2025

6.2.1 ALHAMBRA WASH_DC1
Monitoring Location ID ALHAMBRA WASH_DC1
Receiving Water Name Alhambra Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection Columbia St E/O Brookmere Rd.

Latitude/Longitude 34.124025 N, -118.156297 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 32 MAY 2025

ALHAMBRA WASH_DC1
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 33 MAY 2025

6.2.2 ALHAMBRA WASH_DC2
Monitoring Location ID ALHAMBRA WASH_DC2
Receiving Water Name Alhambra Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection Blair High School ( 1201 S Marengo Ave, Pasadena, CA 91106)
Latitude/Longitude 34. 123 957 N, -118. 145 978 W
Contact Information Name: Blair High School – Pasadena Unified School District
Affiliation: Operations and Maintenance
Phone/Email: (626) 396 -5850

SANITARY SEWER SPILL MONITORING PLAN

15275.05 34 MAY 2025

ALHAMBRA WASH_DC2

SANITARY SEWER SPILL MONITORING PLAN

15275.05 35 MAY 2025

6.2.3 ALHAMBRA WASH_DC3
Monitoring Location ID ALHAMBRA WASH_DC3
Receiving Water Name Alhambra Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection Old Mill Rd E/O Ardmore Rd
Latitude/Longitude 34.118305 N, -118.135383 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 36 MAY 2025

ALHAMBRA WASH_DC3
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 37 MAY 2025

6.2.4 ALHAMBRA WASH_DC4
Monitoring Location ID ALHAMBRA WASH_DC4
Receiving Water Name Alhambra Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection Old Mill Rd E/O Staats Pl
Latitude/Longitude 34.117902 N, -118.131586 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 38 MAY 2025

ALHAMBRA WASH_DC4
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 39 MAY 2025

6.2.5 ALHAMBRA WASH_DC5
Monitoring Location ID ALHAMBRA WASH_DC5
Receiving Water Name Alhambra Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection Arden Rd W/O S. Wilson Ave
Latitude/Longitude 34.131702 N, -118.128295 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 40 MAY 2025

ALHAMBRA WASH_DC5
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 41 MAY 2025

6.2.6 ALHMAMBRA WASH_DC6
Monitoring Location ID ALHAMBRA WASH_DC6
Receiving Water Name Alhambra Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection Rosalind Rd S/O Arden Rd
Latitude/Longitude 34.130987 N, -118.126189 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 42 MAY 2025

ALHAMBRA WASH_DC6
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 43 MAY 2025

6.2.7 ALHAMBRA WASH_DC7
Monitoring Location ID ALHAMBRA WASH_DC7
Receiving Water Name Alhambra Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection Arden Rd & Cameron Dr
Latitude/Longitude 34.132289 N, -118.123186 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 44 MAY 2025

ALHAMBRA WASH_DC7
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 45 MAY 2025

6.2.8 RUBIO WASH_DC1
Monitoring Location ID RUBIO WASH_DC 1
Receiving Water Name Rubio Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection San Pasqual St W/O S. Greenwood Ave Latitude/Longitude 34.137759 N, -118.110923 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 46 MAY 2025

RUBIO WASH_DC1
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 47 MAY 2025

6.2.9 RUBIO WASH_DC2
Monitoring Location ID RUBIO WASH_DC 2
Receiving Water Name Rubio Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection S. Craig Ave S/O E. Del Mar Blvd Latitude/Longitude 34.141882 N, -118.106193 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 48 MAY 2025

RUBIO WASH_DC2
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 49 MAY 2025

6.2.10 RUBIO WASH_DC3
Monitoring Location ID RUBIO WASH_DC 3
Receiving Water Name Rubio Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection S. Sierra Madre Blvd N/O Oneida St Latitude/Longitude 34.14112 N, -118.101615 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 50 MAY 2025

RUBIO WASH_DC3
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 51 MAY 2025

6.2.11 RUBIO WASH_DC4
Monitoring Location ID RUBIO WASH_DC 4
Receiving Water Name Rubio Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection E. Del Mar Blvd & S. Altadena Dr Latitude/Longitude 34.142053 N, -118.098749 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 52 MAY 2025

RUBIO WASH_DC4
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 53 MAY 2025

6.2.12 EATON WASH_DC1
Monitoring Location ID EATON WASH_DC 1
Receiving Water Name Eaton Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection E. Foothill Blvd & N. Michillinda Ave Latitude/Longitude 34.150322 N, -118.06783 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 54 MAY 2025

EATON WASH_DC1
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 55 MAY 2025

6.2.13 EATON WASH_DC2
Monitoring Location ID EATON WASH_DC2
Receiving Water Name Eaton Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection San Pasqual St & Plumosa Dr
Latitude/Longitude 34.13793717 N, --118.085394 8W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 56 MAY 2025

EATON WASH_DC2
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 57 MAY 2025

6.2.14 EATON WASH_DC3
Monitoring Location ID EATON WASH_DC 3
Receiving Water Name Eaton Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection E California Blvd & Brightside Ln Latitude/Longitude 34.135932 N, --118.084759 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 58 MAY 2025

EATON WASH_DC3
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 59 MAY 2025

6.2.15 EATON WASH_DC4
Monitoring Location ID EATON WASH_DC4
Receiving Water Name Eaton Wash
Monitoring Location Type Drainage Conveyance (DC)
Address /Intersection Sunnyslope Blvd & Le Presa Dr
Latitude/Longitude 34.131425 N, --118.086064 W

SANITARY SEWER SPILL MONITORING PLAN

15275.05 60 MAY 2025

EATON WASH_DC4
Street View

SANITARY SEWER SPILL MONITORING PLAN

15275.05 61 MAY 2025

7 Summary
This Monitoring Plan provides the City with technical guidance for monitoring receiving water quality in the event of a sewer spill. Water quality monitoring can help the City determine the relative impact of a spill and help guide management decisions relating to remediation and spill response. These monitoring protocols, and site -specific descriptions, provide City staff with a detailed guidance document for performing water quality monitoring and assessing impact to waterbodies following a sewer spill.

Selection of the monitoring locations for this Monitoring Plan was determined based on proximity to City assets, drainage characteristics, safety, accessibility, and ability to isolate runoff from a spill that is only influenced by the City. This document provides multiple locations that may be used as downstream and upstream monitoring locations to assess, not only the downstream impacts of spills, but also the upstream pollutant characteristics to document the relative impact in each receiving water . Drainage conveyance and point of discharge monitoring locations will be determined in real time if a spill reaches the receiving water. All monitoring sites are subject to change should a different site be identified as preferable for properly characterizing impacts to water quality from a spill event. It is recommended that the City annually visit the monitoring locations identified in this plan to ensure access is still available and safe.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 62 MAY 2025

8 References
Caltrans 2020. Stormwater Monitoring Guidance Manual. https://dot.ca.gov/-/media/dot- media/programs/environmental-analysis/documents/env/ctws-ot-20-350-04-01-monitoring-guidance- manual-a11y.pdf
Environmental Protection Agency 1992. NPDES Storm Water Sampling Guidance Document. https://www3.epa.gov/npdes/pubs/owm0093.pdf
State Water Resources Control Board 2022. Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems. Order WQ 2022-0103-DWQ.
https://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2022/wqo_2022- 0103-dwq.pdf

SANITARY SEWER SPILL MONITORING PLAN

15275.05 63 MAY 2025

INTENTIONALLY LEFT BLANK

SANITARY SEWER SPILL MONITORING PLAN

15275.05 64 MAY 2025

Appendix A
Waste Discharge Requirements (WQ 2003-0005-DWQ)
Attachment E.1
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 1
ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING AND

RECORDKEEPING REQUIREMENTS
Table of Contents

1. Notification Requirements ......................................................................................... E1-3

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services ...................................................................................... E1-3

1.2. Spill Notification Information ........................................................................... E1-4

1.3. Notification of Spill Report Updates ................................................................ E1-4

2. Spill-Specific Monitoring Requirements .................................................................... E1-5

2.1 Spill Location and Spread .............................................................................. E1-5

2.2 Spill Volume Estimation.................................................................................. E1-5

2.3. Receiving Water Monitoring ............................................................................ E1-5

2.4. Safety and Access Exceptions ........................................................................ E1-8

3. Reporting Requirements ............................................................................................ E1-8

3.1. Reporting Requirements for Individual Category 1 Spill Reporting ................. E1-8

3.2. Reporting Requirements for Individual Category 2 Spill Reporting ............... E1-12

3.3. Monthly Certified Spill Reporting for Category 3 Spills .................................. E1-14

3.4. Monthly Certified Spill Reporting for Category 4 Spills .................................. E1-16

3.5. Amended Certified Spill Reports for Category 3 Spills .................................. E1-16

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills ............. E1-16

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” ................................................................................................ E1-16

3.8. Electronic Sanitary Sewer System Service Area Boundary Map ................... E1-17

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ) .................................................................. E1-17

3.10. Sewer System Management Plan Audit Reporting Requirements ................ E1-19

3.11. Sewer System Management Plan Reporting Requirements ......................... E1-19

4. Recordkeeping Requirements ................................................................................. E1-20

4.1. Recordkeeping Time Period .......................................................................... E1-20

4.2. Availability of Documents .............................................................................. E1-20

4.3. Spill Reports .................................................................................................. E1-20

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills ....... E1-21

4.5. Sewer System Telemetry Records ................................................................ E1-22

4.6. Sewer System Management Plan Implementation Records ......................... E1-22

4.7. Audit Records ................................................................................................ E1-23 STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 2

4.8. Equipment Records ....................................................................................... E1-23

4.9. Work Orders .................................................................................................. E1-23

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 3
ATTACHMENT E1– NOTIFICATION, MONITORING, REPORTING AND RECORDKEEPING

REQUIREMENTS
The Notification Requirements (section 1), Spill-specific Monitoring Requirements (section 2), Reporting Requirements (section 3) and Recordkeeping Requirements (section 4) in this Attachment are pursuant to Water Code section 13267 and section 13383, and are an enforceable component of this General Order. For the purpose of this General Order, the term:
• Notification means the notifying of appropriate parties of a spill event or other activity. • Spill-specific Monitoring means the gathering of information and data for a specific spill event to be reported or kept as records.
• Reporting means the reporting of information and data into the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. • Recordkeeping means the maintaining of information and data in an official records storage system.

Failure to comply with the notification, monitoring, reporting and recordkeeping requirements in this General Order may subject the Enrollee to civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement.

Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Resources Control Board ( State Water Board ) to collect sanitary sewer spill information for each spill event and make this information available to the public. Sanitary sewer spill information for each spill event includes but is not limited to: Enrollee contact information for each spill event, spill cause, estimated spill volume and factors used for estimation, location, date, time, duration, amount discharged to waters of the State, response and corrective action(s) taken.

1. NOTIFICATION REQUIREMENTS

1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the Enrollee shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The Enrollee has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.

The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from an Enrollee-owned and/or operated laterals, to a water of the State.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 4

1.2. Spill Notification Information
The Enrollee shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services;
• Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
o Brief narrative of the spill event, and
o Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks;
• Name and phone number of contact person on-scene;
• Date and time the Enrollee was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.

1.3. Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the Enrollee certifies the spill report in the online CIWQS Sanitary Sewer System Database, the Enrollee shall provide updates to the California Office of Emergency Services regarding substantial changes to:
• Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and
• Additional impact(s) to the receiving water(s) and beneficial uses.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 5

2. SPILL-SPECIFIC MONITORING REQUIREMENTS

2.1 Spill Location and Spread
The Enrollee shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The Enrollee shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.

For multiple appearance points of a single spill event, the points closest to the spill origin.
• Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.

2.2 Spill Volume Estimation
To assess the approximate spill magnitude and spread, the Enrollee shall estimate the total spill volume using updated volume estimation techniques, calculations, and documentation for electronic reporting. The Enrollee shall update its notification and reporting of estimated spill volume (which includes spill volume recovered) as further information is gathered during and after a spill event.

2.3. Receiving Water Monitoring

2.3.1. Receiving Water Visual Observations
Through visual observations and use of best available spill volume-estimating techniques and field calculation techniques, the Enrollee shall gather and document the following information for spills discharging to surface waters:
• Estimated spill travel time to the receiving water;
• For spills entering a drainage conveyance system, estimated spill travel time from the point of entry into the drainage conveyance system to the point of discharge into the receiving water;
• Estimated spill volume entering the receiving water; and • Photography of:
o Waterbody bank erosion,
o Floating matter,
o Water surface sheen (potentially from oil and grease), STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 6
o Discoloration of receiving water, and
o Impact to the receiving water.

2.3.2. Receiving Water – Water Quality Sampling and Analysis For sewage spills in which an estimated 50,000 gallons or greater are discharged into a surface water, the Enrollee shall conduct the following water quality sampling no later than 18 hours after the Enrollee’s knowledge of a potential discharge to a surface water:
• Collect one water sample, each day of the duration of the spill, at:
o The DCS-001 location as described in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment, if sewage discharges to a surface water via a drainage conveyance system; and/or
o Each of the three receiving water sampling locations in section 2.3.4 (Receiving Water Sampling Locations) of this Attachment;
If the receiving water has no flow during the duration of the spill, the Enrollee must report “No Sampling Due To No Flow” for its receiving water sampling locations.

The Enrollee shall analyze the collected receiving water samples for the following constituents per section 2.3.3 (Water Quality Analysis Specifications) of this Attachment:
• Ammonia, and
• Appropriate bacterial indicator(s) per the applicable Basin Plan water quality objectives, including one or more of the following, unless directed otherwise by the Regional Water Board:
o Total Coliform Bacteria
o Fecal Coliform Bacteria
o E-coli
o Enterococcus
Dependent on the receiving water(s), sampling of bacterial indicators shall be sufficient to determine post-spill (after the spill) compliance with the water quality objectives and bacterial standards of the California Ocean Plan or the California Inland Surface Water Enclosed Bays, and Estuaries Plan, including the frequency and/or number of post-spill receiving water samples as may be specified in the applicable plans.

The Enrollee shall collect and analyze additional samples as required by the applicable Regional Water Board Executive Officer or designee.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 7

2.3.3. Water Quality Analysis Specifications
Spill monitoring must be representative of the monitored activity (40 Code of Federal Regulations section 122.41(j)(1)).

Sufficiently Sensitive Methods
Sample analysis must be conducted according to sufficiently sensitive test methods approved under 40 Code of Federal Regulations Part 136 for the sample analysis of pollutants. For the purposes of this General Order, a method is sufficiently sensitive when the minimum level of the analytical method approved under 40 Code of Federal Regulations Part 136 is at or below the receiving water pollutant criteria.

Environmental Laboratory Accreditation Program-Accredited Laboratories The analysis of water quality samples required per this General Order must be performed by a laboratory that has accreditation pursuant to Article 3 (commencing with section 100825) of Chapter 4 of Part 1 of Division 101 of the Health and Safety Code. (Water Code section 13176(a).) The State Water Board accredits laboratories through its Environmental Laboratory Accreditation Program (ELAP).

2.3.4. Receiving Water Sampling Locations
The Enrollee shall collect receiving water samples at the following locations.

Sampling of Flow in Drainage Conveyance System (DCS) Prior to Discharge Sampling
Location Sampling Location Description
DCS-001 A point in a drainage conveyance system before the drainage conveyance system flow discharges into a receiving water.

Receiving Surface Water Sampling (RSW)1

Sampling
Location Sampling Location Description
RSW-001
Point of Discharge
A point in the receiving water where sewage initially enters the receiving water.

RSW-001U:

Upstream of Point
of Discharge
A point in the receiving water, upstream of the point of sewage discharge, to capture ambient conditions absent of sewage discharge impacts.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 8
Sampling
Location Sampling Location Description
RSW-001D:

Downstream of
Point of Discharge
A point in the receiving water, downstream of the point of sewage discharge, where the spill material is fully mixed with the receiving water.
1 The Enrollee must use its best professional judgment to determine the upstream and downstream distances based on receiving water flow, accessibility to upstream/downstream waterbody banks, and size of visible sewage plume.

2.4. Safety and Access Exceptions
If the Enrollee encounters access restrictions or unsafe conditions that prevents its compliance with spill response requirements or monitoring requirements in this General Order, the Enrollee shall provide documentation of access restrictions and/or safety hazards in the corresponding required report.

3. REPORTING REQUIREMENTS
All reporting required in this General Order must be submitted electronically to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov), unless specified otherwise in this General Order. Electronic reporting may solely be conducted by a Legally Responsible Official or Data Submitter(s) previously designated by the Legally Responsible Official, as required in section 5.8 (Designation of Data Submitters) of this General Order.

The Enrollee shall report any information that is protected by the Homeland Security Act, by email to [email protected], with a brief explanation of the protection provided by the Homeland Security Act for the subject report to be protected from unauthorized disclosure and/or public access, and for official Water Board regulatory purposes only.

3.1. Reporting Requirements for Individual Category 1 Spill Reporting

3.1.1. Draft Spill Report for Category 1 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 1 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 9

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system;

11. Description and photographs of all discharge point(s) into the surface water;

12. Estimated spill volume that discharged to surface waters; and

13. Estimated total spill volume recovered.

3.1.2. Certified Spill Report for Category 1 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for Category 1 spills, to the online CIWQS Sanitary Sewer System Database.

Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.1.1 (Draft Spill Report for Category 1 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 10

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, lateral, pump station, etc.);

6. Description of the pipe material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion;

14. Name and type of receiving water body(s);

15. Description of the water body(s), including but not limited to:
o Observed impacts on aquatic life,
o Public closure, restricted public access, temporary restricted use, and/or posted health warnings due to spill,
o Responsible entity for closing/restricting use of water body, and o Number of days closed/restricted as a result of the spill.

16. Whether or not the spill was located within 1,000 feet of a municipal surface water intake; and

17. If water quality samples were collected, identify sample locations and the parameters the water quality samples were analyzed for. If no samples were taken, Not Applicable shall be selected.

3.1.3. Spill Technical Report for Individual Category 1 Spill in which 50,000 Gallons or Greater Discharged into a Surface Water
For any spill in which 50,000 gallons or greater discharged into a surface water, within 45 calendar days of the spill end date, the Enrollee shall submit a Spill Technical Report to the online CIWQS Sanitary Sewer System Database. The Spill Technical Report, at minimum, must include the following information:

1. Spill causes and circumstances, including at minimum:
o Complete and detailed explanation of how and when the spill was discovered; STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 11
o Photographs illustrating the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions;
o Diagram showing the spill failure point, appearance point(s), the spill flow path, and ultimate destinations;
o Detailed description of the methodology employed, and available data used to calculate the discharge volume and, if applicable, the recovered spill volume; o Detailed description of the spill cause(s);
o Description of the pipe material, and estimated age of the pipe material, at the failure location;
o Description of the impact of the spill;
o Copy of original field crew records used to document the spill; and o Historical maintenance records for the failure location.

2. Enrollee’s response to the spill:
o Chronological narrative description of all actions taken by the Enrollee to terminate the spill;
o Explanation of how the Sewer System Management Plan Spill Emergency Response Plan was implemented to respond to and mitigate the spill; and o Final corrective action(s) completed and a schedule for planned corrective actions, including:
▪ Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable,
▪ Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences, and ▪ Necessary modifications to the Emergency Spill Response Plan to incorporate lessons learned in responding to and mitigating the spill.

3. Water Quality Monitoring, including at minimum:
o Description of all water quality sampling activities conducted; o List of pollutant and parameters monitored, sampled and analyzed; as required in section 2.3 (Receiving Water Monitoring) of this Attachment; o Laboratory results, including laboratory reports;
o Detailed location map illustrating all water quality sampling points; and o Other regulatory agencies receiving sample results (if applicable).

4. Evaluation of spill impact(s), including a description of short-term and long-term impact(s) to beneficial uses of the surface water.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 12

3.1.4. Amended Certified Spill Reports for Individual Category 1 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.2. Reporting Requirements for Individual Category 2 Spill Reporting

3.2.1. Draft Spill Report for Category 2 Spills
Within three (3) business days of the Enrollee’s knowledge of a Category 2 spill, the Enrollee shall submit a Draft Spill Report to the online CIWQS Sanitary Sewer System Database.

The Draft Spill Report must, at minimum, include the following items:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Date and time the Enrollee notified the California Office of Emergency Services, and the assigned control number;

7. Description, photographs, and GPS coordinates of the system location where the spill originated;
If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

8. Estimated total spill volume exiting the system;

9. Description and photographs of the extent of the spill and spill boundaries;

10. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry location(s); o Estimated spill volume fully recovered from the drainage conveyance system; o Estimated spill volume remaining within the drainage conveyance system; STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 13
o Estimated spill volume discharged to a groundwater infiltration basin or facility, if applicable; and

11. Estimated total spill volume recovered.

3.2.2. Certified Spill Report for Category 2 Spills
Within 15 calendar days of the spill end date, the Enrollee shall submit a Certified Spill Report for the Category 2 spill, to the online CIWQS Sanitary Sewer System Database (https://ciwqs.waterboards.ca.gov). Upon completion of the Certified Spill Report, the online CIWQS Sanitary Sewer System Database will issue a final spill event identification number.

The Certified Spill Report must, at minimum, include the following mandatory information in addition to all information in the Draft Spill Report per section 3.2.1 (Draft Spill Report for Category 2 Spills) above:

1. Description of the spill event destination(s), including GPS coordinates if available, that represent the full spread and reach of the spill;

2. Spill end date and time;

3. Description of how the spill volume estimations were calculated, including at a minimum:
o The methodology, assumptions and type of data relied upon, such as supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology(ies), assumptions and type of data relied upon for estimations of the spill start time and the spill end time;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

5. System failure location (for example, main, pump station, etc.);

6. Description of the pipe/infrastructure material, and estimated age of the pipe material, at the failure location;

7. Description of the impact of the spill;

8. Whether or not the spill was associated with a storm event;

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of major milestones for those steps;

11. Spill response completion date;

12. Detailed narrative of investigation and investigation findings of cause of spill;

13. Reasons for an ongoing investigation (as applicable) and the expected date of completion; and
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 14

14. Whether or not the spill was located within 1,000 feet of a municipal surface water intake.

3.2.3. Amended Certified Spill Reports for Individual Category 2 Spills The Enrollee shall update or add additional information to a Certified Spill Report within 90 calendar days of the spill end date by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database.

The Enrollee shall certify the amended report.

After 90 calendar days, the Enrollee shall contact the State Water Board at [email protected] to request to amend a Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the Amended Spill Report due date.

3.3. Monthly Certified Spill Reporting for Category 3 Spills The Enrollee shall report and certify all Category 3 spills to the online CIWQS Sanitary Sewer System Database within 30 calendar days after the end of the month in which the spills occurred. (For example, all Category 3 spills occurring in the month of February shall be reported and certified by March 30th). After the Legally Responsible Official certifies the spills, the online CIWQS Sanitary Sewer System Database will issue a spill event identification number for each spill.

The monthly reporting of all Category 3 spills must include the following items for each spill:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Date and time the Enrollee was notified of, or self-discovered, the spill;

4. Operator arrival time;

5. Estimated spill start date and time;

6. Description, photographs, and GPS coordinates where the spill originated:
o If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field;

7. Estimated total spill volume exiting the system;

8. Description and photographs of the extent of the spill and spill boundaries;

9. Did the spill reach a drainage conveyance system? If Yes:
o Description of the drainage conveyance system transporting the spill; o Photographs of the drainage conveyance system entry locations(s); o Estimated spill volume fully recovered from the drainage conveyance system; and STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 15
o Estimated spill volume discharged to a groundwater infiltration basis or facility, if applicable.

10. Estimated total spill volume recovered;

11. Description of the spill event destination(s), including GPS coordinates, if available, that represent the full spread and reaches of the spill;

12. Spill end date and time;

13. Description of how the spill volume estimations were calculated, including, at minimum:
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, on-going spill rate at time of arrival (if applicable), and the spill end time;

14. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

15. System failure location (for example, main, pump station, etc.);

16. Description of the pipe/infrastructure material, and estimated age of the pipe/infrastructure material, at the failure location;

17. Description of the impact of the spill;

18. Whether or not the spill was associated with a storm event;

19. Description of spill response activities including description of immediate spill containment and cleanup efforts;

20. Description of spill corrective actions, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill, and a schedule of the major milestones for those steps; including, at minimum:
o Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable, and
o Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences at the same spill event location, including:
▪ Adjusted schedule/method of preventive maintenance,
▪ Planned rehabilitation or replacement of sanitary sewer asset, ▪ Inspected, repaired asset(s), or replaced defective asset(s), ▪ Capital improvements,
▪ Documentation verifying immediately implemented system modifications and operating/maintenance modifications,
▪ Description of spill response activities,
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 16
▪ Spill response completion date, and
▪ Ongoing investigation efforts, and expected completion date of investigation to determine the full cause of spill;

21. Detailed narrative of investigation and investigation findings of cause of spill.

3.4. Monthly Certified Spill Reporting for Category 4 Spills The Enrollee shall report and certify the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills to the online CIWQS Sanitary Sewer System Database, within 30 calendar days after the end of the month in which the spills occurred.

3.5. Amended Certified Spill Reports for Category 3 Spills Within 90 calendar days of the certified Spill Report due date, the Enrollee may update or add additional information to a certified Spill Report by amending the report or by adding an attachment to the Spill Report in the online CIWQS Sanitary Sewer System Database. The Enrollee shall certify the amended report.

After 90 calendar days, the Legally Responsible Official shall contact the State Water Board at [email protected] to request to amend a certified Spill Report. The Legally Responsible Official shall submit justification for why the additional information was not reported within the 90-day timeframe for amending the certified Spill Report, as provided above.

3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills For all Category 4 spills and spills from its owned and/or operated laterals that are caused by a failure or blockage in the lateral and that do not discharge to a surface water, the Enrollee shall:
• Maintain records per section 4.4. of this Attachment; The Enrollee shall provide records upon request by State Water Board or Regional Water Board staff.
• Annually upload and certify a report, in an appropriate digital format, of all recordkeeping of spills to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occurred.

A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section 3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.

3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills”
If either (1) no spills occur during a calendar month or (2) only Category 4, and/or Enrollee-owned and/or operated lateral spills (that do not discharge to a surface water) occur during a calendar month, the Enrollee shall certify, within 30 calendar days after STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 17
the end of each calendar month, either a “No-Spill” certification statement, or a “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” certification statement, in the online CIWQS Sanitary Sewer System Database, certifying that there were either no spills, or Category 4 and/or Non-Category 1 Lateral Spills that will be reported annually (per section 3.6 of this Attachment) for the designated month.

If a spill starts in one calendar month and ends in a subsequent calendar month, and the Enrollee has no further spills of any category, in the subsequent calendar month, the Enrollee shall certify “no-spills” for the subsequent calendar month.

If the Enrollee has no spills from its systems during a calendar month, but the Enrollee voluntarily reported a spill from a private lateral or a private system, the Enrollee shall certify “no-spills” for that calendar month.

If the Enrollees has spills from its owned and/or operated laterals during a calendar month, the Enrollee shall not certify “no spills” for that calendar month.

3.8. Electronic Sanitary Sewer System Service Area Boundary Map The Legally Responsible Official shall submit, to the State Water Board, an up-to-date electronic spatial map of its sewer system service area boundaries. The map must be in accordance with section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order and the specification provided on the statewide Sanitary Sewer Systems program website. The map must include the location of wastewater treatment facility(ies) that treats the sewer system waste, if in the same sewer service boundary.

By the Effective Date of this General Order, specifications for the electronic sanitary sewer service area boundary map format will be provided on the statewide Sanitary Sewer Systems Order program website.

3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ)
A new Enrollee shall complete and submit its first certified Annual Report into the online CIWQS Sanitary Sewer System Database, within 30 days of obtaining a CIWQS account; Subsequent Annual Reports are due by April 1 of each year.

All enrollees shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of this General Order, for each calendar year (January 1 through December 31).

The Annual Report must be entered directly into the online CIWQS Sanitary Sewer System Database. The Enrollee’s Legally Responsible Official shall certify the Annual Report as instructed in CIWQS;
The Annual Report must address, and update as applicable, the following items:
• Population served;
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 18
• Updated sewer system service area boundary map, if service area boundary has changed from original map submitted per section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order; • Number of system operation and maintenance staff:
o Entry level (less than two years of experience),
o Journey level (greater than two years of experience), o Supervisory level, and
o Managerial level;
• Number of operation and maintenance staff certified as a certified collection system operator by the California Water Environmental Association (CWEA), with:
o Corresponding number of certified collection system operator grade levels (Grade I, II, III, IV, and V);
• System information:
o Miles of system gravity and force mains,
o Number of upper and lower service laterals connected to system, o Estimated number of upper and lower laterals owned and/or operated by the Enrollee,
o Portion of laterals that is Enrollee’s responsibility, o Average age the major components of system infrastructure, o Number and age of pump stations, and
o Estimated total miles of the system pipeline not accessible for maintenance; • Name and location of the treatment plant(s) receiving sanitary sewer system’s waste;
• Name of satellite sewer system tributaries;
• Number of system’s gravity sewer above or underground crossings of water bodies throughout system;
• Number of force main (pressurized pipe) above or underground crossings of water bodies throughout system;
• Number of siphons used to convey waste throughout the sewer system; • Miles of sewer system cleaned;
• Miles of sewer system video inspected, or comparable (i.e., video closed-circuit television or alternative inspection methods);
• System Performance Evaluation as specified in section 5.11 (System Performance Analysis) of this General Order;
• Major spill causes (for example, root intrusion, grease deposition); STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 19
• System infrastructure failure points (for example, main, pump station, lateral, etc.); • Ongoing spill investigations; and
• Actions taken to address system deficiencies.

3.10. Sewer System Management Plan Audit Reporting Requirements The Enrollee shall submit its Sewer System Management Plan Audit and other pertinent audit information, in accordance with section 5.4 (Sewer System Management Plan Audits) of this General Order, to the online CIWQS Sanitary Sewer System Database by six (6) months after the end of the 3-year audit period.

If a Sewer System Management Plan Audit is not conducted as required: the Enrollee shall:
• Update the online CIWQS Sanitary Sewer System Database and select the justification for not conducting the Audit; and
• Notify its corresponding Regional Water Board (see Attachment F (Regional Water Quality Control Board Contact Information)) of the justification for the lapsed requirements.

The Enrollee’s reporting of a justification for not conducting a timely Audit does not justify non-compliance with this General Order. The Enrollee shall:
• Submit the late Audit as required in this General Order; and • Comply with subsequent Audit requirements and due dates corresponding with the original audit cycle.

3.11. Sewer System Management Plan Reporting Requirements For an Existing Enrollee previously regulated by Order 2006-0003-DWQ: Within every six (6) years after the required due date of its last Plan Update, the Legally Responsible Official shall upload and certify a local governing entity-approved Sewer System Management Plan Update to the online CIWQS Sanitary Sewer System Database. If the electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its updated Sewer System Management Plan posted on its own website.

Order 2006-0003-DWQ required each enrollee to develop its initial Sewer System Management Plan per the following schedule, with required Plan updates at a frequency of 5-years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2009 Between 100,000 and 10,000: August 2, 2009
Between 10,000 and 2,500: May 2, 2010
Less than 2,500: August 2, 2010
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 20
This Order carries forth the previously-required Plan Update schedule per Order 2006-0003-DWQ. Per the six-year Plan Update frequency required in this Order, the Enrollee shall upload and certify its first Plan Update, to the online CIWQS Sanitary Sewer System Database by the following due dates, with subsequent Plan Updates at the frequency of six years thereafter:

Systems serving populations: Greater than 100,000: May 2, 2025 Between 100,000 and 10,000: August 2, 2025
Between 10,000 and 2,500: May 2, 2026
Less than 2,500: August 2, 2026
For a New Enrollee: Within twelve (12) months of its Application for Enrollment Approval date, the Legally Responsible Official of a new Enrollee shall upload and certify a local governing entity-approved Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database. If electronic document format or size capacity prevents the electronic upload of the Plan, the Legally Responsible Official shall report an electronic link to its Sewer System Management Plan posted on its own website. The due date for subsequent 6-year Plan updates, is six (6) years from the submittal due date of the new Enrollee’s first Sewer System Management Plan.

4. RECORDKEEPING REQUIREMENTS
The Enrollee shall maintain records to document compliance with the provisions of this General Order, and previous General Order 2006-0003-DWQ as applicable, for each sanitary sewer system owned, including any required records generated by an Enrollee’s contractor(s).

4.1. Recordkeeping Time Period
The Enrollee shall maintain records of documents required in this Attachment, including records collected for compliance with this General Order, and records collected in accordance with previous General Order 2006-0003-DWQ, for five (5) years.

4.2. Availability of Documents
The Enrollee shall make the records required in this General Order readily available, either electronic or hard copies, for review by Water Board staff during onsite inspections or through an information request.

4.3. Spill Reports
The Enrollee shall maintain records for each of the following spill-related events and activities:
• Spill event complaint, including but not limited to records documenting how the Enrollee responded to notifications of spills. Each complaint record must, at a minimum, include the following information:
o Date, time, and method of notification,
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 21
o Date and time the complainant first noticed the spill, if available, o Narrative description of the complaint, including any information the caller provided regarding whether the spill has reached surface waters or a drainage conveyance system, if available,
o Complainant’s contact information, if available, and
o Final resolution of the complaint;
• Records documenting the steps and/or remedial action(s) undertaken by the Enrollee, using all available information, to comply with this General Order, and previous General Order 2006-0003-DWQ as applicable;
• Records documenting how estimate(s) of volume(s) and, if applicable, volume(s) of spill recovered were calculated;
• All California Office of Emergency Services notification records, as applicable; and • Records, in accordance with the Monitoring Requirements in this Attachment.

4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills An Enrollee must maintain the following records for each individual Category 4 spill and for each individual non-Category 1 Enrollee-owned and/or operated lateral spill, and report in accordance to section 3.6 (Annual Certified Spill Reporting of Category 4 and/or Lateral Spills) of this Attachment.

Recordkeeping of Individual Category 4 Spill Information:

1. Contact information: Name and telephone number of Enrollee contact person to respond to spill-specific questions;

2. Spill location name;

3. Description and GPS coordinates for the system location where the spill originated;

4. Did the spill reach a drainage conveyance system? If Yes:
o Description of drainage conveyance system location,
o Estimated spill volume fully recovered within the drainage conveyance system, and
o Estimated spill volume remaining within the drainage conveyance system;

5. Estimated total spill volume exiting the sanitary sewer system;

6. Spill date and start time;

7. Spill cause(s) (for example, root intrusion, grease deposition, etc.);

8. System failure location (for example, main, pump station, etc.);

9. Description of spill response activities including description of immediate spill containment and cleanup efforts;

10. Description of how the volume estimation was calculated, including, at minimum:

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 22
o The methodology and type of data relied upon, including supervisory control and data acquisition (SCADA) records, flow monitoring or other telemetry information used to estimate the volume of the spill discharged, and the volume of the spill recovered (if any volume of the spill was recovered), and o The methodology and type of data relied upon to estimate the spill start time, on- going spill rate at time of arrival (if applicable), and the spill end time;

11. Description of implemented system modifications and operating/maintenance modifications.

Recordkeeping of Individual Lateral Spill Information:

1. Date and time the Enrollee was notified of, or self-discovered, the spill;

2. Location of individual spill;

3. Estimated individual spill volume;

4. Spill cause(s) (for example, root intrusion, grease deposition, etc.); and

5. Description of how the volume estimations were calculated.

Total Annual Spill Information:

1. Estimated total annual spill volume;

2. Description of spill corrective actions, including at minimum:
o Local regulatory enforcement action taken against the sewer lateral owner in response to a spill, as applicable, and
o System operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill location.

4.5. Sewer System Telemetry Records
The Enrollee shall maintain the following sewer system telemetry records if used to document compliance with this General Order, and previous General Order 2006-0003-DWQ as applicable, including spill volume estimates:
• Supervisory control and data acquisition (SCADA) system(s); • Alarm system(s);
• Flow monitoring device(s) or other instrument(s) used to estimate sewage flow rates, and/or volumes;
• Computerized maintenance management system records; and • Asset management-related records.

4.6. Sewer System Management Plan Implementation Records The Enrollee shall maintain records documenting the Enrollee’s implementation of its Sewer System Management Plan, including documents supporting its Sewer System Management Plan audits, corrections, modifications, and updates to the Sewer System Management Plan.

STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 23

4.7. Audit Records
The Enrollee shall maintain, at minimum, the following records pertaining to its Sewer System Management Plan audits, and other internal audits:
• Completed audit documents and findings;
• Name and contact information of staff and/or consultants that conducted or involved in the audit; and
• Follow-up actions based on audit findings.

4.8. Equipment Records
The Enrollee shall maintain a log of all owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.

4.9. Work Orders
The Enrollee shall maintain record of work orders for operations and maintenance projects.

SANITARY SEWER SPILL MONITORING PLAN

15275.05 65 MAY 2025

INTENTIONALLY LEFT BLANK

SANITARY SEWER SPILL MONITORING PLAN

15275.05 66 MAY 2025

Appendix B
Chain of Custody Example Sheet

SAMPLER NAME SAMPLE LOCATION

SUPERVISOR NAME SAMPLE TYPE
Drainage Conveyance System (DCS) Prior to Discharge
Receiving Water Sample (RSW) Point of Discharge
OTHER PERSONNEL Receiving Water Sample (RSW) Upstream of Point of Discharge Receiving Water Sample (RSW) Downstream of Point of Discharge ID# DATE TIME # OF
(Lab Use Only) SAMPLED SAMPLED CONT.

DATE / TIME RECEIVED BY DATE / TIME

DATE / TIME RECEIVED BY DATE / TIME

Y / N
Samples Preserved Y / N

DATE / TIME RECEIVED BY DATE / TIME
Evidence Seals Present Y / N
Container Attacked Y / N

SPECIAL REQUIREMENTS / BILLING INFORMATION

RELINQUISHED BY

RELINQUISHED BY
OL = Oil
WW = Waste Water
DW = Drinking Water
SO = Soild/Soil
SL = Sludge
GW = Ground Water
SAMPLE TYPE CODE:

SAMPLE CONDITION:

SEWER SPILL RECEIVING WATER MONITORING PLAN CHAIN OF CUSTODY RECORD SM-992-B E. Coli
SM-9223-B Enterococcus
WORK ORDER#______________________________
Fac ID
SW = Sea Water
Actual Temperature: Thermometer #:

Received On Ice
Sample Point ID/Name
OT = Other Matrix
SF = Surface Water

SPECIAL HANDLING

COMMENTS

RELINQUISHED BY

ANALYSES REQUESTED
EPA 350.1 Ammonia Nitrogen
Check
Check
Check
Check

Page_______ of _______

SANITARY SEWER SPILL MONITORING PLAN

15275.05 67 MAY 2025

INTENTIONALLY LEFT BLANK

SANITARY SEWER SPILL MONITORING PLAN

15275.05 68 MAY 2025

Appendix C
Sewer Spill Visual Observation Log

SANITARY SEWER SPILL MONITORING PLAN

15275.05 69 MAY 2025

Sewer Spill Visual Observation Log – Receiving Water Sampling Events Date and Time of Sample:

Sample ID:

Sample Location Description:

Sample Type (check one):
□ Drainage Conveyance System (DCS) Prior to Discharge
□ Receiving Water Sample (RSW) Point of Discharge
□ Receiving Water Sample (RSW) Upstream of Point of Discharge □ Receiving Water Sample (RSW) Downstream of Point of Discharge Weather:

Antecedent Conditions (last 48 hours):

Precipitation Total Last 48 Hours: (inches)
Sample Event Ambient Conditions:

Sampling Event Observations:

Estimate spill travel time to receiving water: (minutes) For spills entering a drainage conveyance system, estimated spill travel time from the point of entry into the drainage conveyance system to the point of discharge into the receiving water:
(minutes)
Estimated spill volume entering the receiving water: (gallons) Estimated receiving water flow rate: (Cubic feet per second) Odors: Yes □ No □
Floating Material: Yes □ No □
Suspended Material: Yes □ No □
Sheen: Yes □ No □
Discoloration: Yes □ No □
Turbidity: Yes □ No □

SANITARY SEWER SPILL MONITORING PLAN

15275.05 70 MAY 2025

Photos (check all that apply):

Waterbody bank erosion: Yes □ No □
Floating material: Yes □ No □
Water surface sheen (potentially from oil and grease): Yes □ No □ Discoloration of receiving water: Yes □ No □
Impact to the receiving water: Yes □ No □
General Notes:

Appendix D
Spill Emergency Response Plan Change Log

Appendix D: Spill Emergency Response Plan Change Log

City of Pasadena Spill Emergency Response Plan Page 46

City of Pasadena
Spill Emergency Response Plan Change Log

DATE SERP ELEMENT DESCRIPTION OF CHANGE/REVISION MADE CHANGE AUTHORIZED BY

Appendix D: Spill Emergency Response Plan Change Log

City of Pasadena Spill Emergency Response Plan Page 47

DATE SERP ELEMENT DESCRIPTION OF CHANGE/REVISION MADE CHANGE AUTHORIZED BY

Appendix E
SSMP Revised May 2019

CITY OF PASADENA

SEWER SYSTEM MANAGEMENT PLAN

DECEMBER 2019

CITY OF PASADENA

SEWER SYSTEM MANAGEMENT PLAN (SSMP)

CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS
100 N. Garfield Avenue Room N306
Pasadena, California 91101

Pursuant to the provisions of the

CALIFORNIA STATE WATER RESOURCES CONTROL BOARD
ORDER NO. 2006.0003-DWQ

STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS (WDR)

FOR SANITARY SEWER SYSTEMS

December 2019

Table of Contents

City of Pasadena - Sewer System Management Plan DRAFT Report Page i

TABLE OF CONTENTS
INTRODUCTION ............................................................................................................. 1 DEFINITIONS ................................................................................................................. 2 CHAPTER 1 – PROHIBITIONS AND PROVISIONS ....................................................... 4

1.1 Prohibitions ................................................................................................ 4

1.2 Provisions .................................................................................................. 4 CHAPTER 2 – GOALS .................................................................................................... 8

2.1 Purpose ..................................................................................................... 8

2.2 Goals ......................................................................................................... 8

2.3 About This Document ................................................................................ 9 CHAPTER 3 – ORGANIZATION ................................................................................... 10

3.1 Name of Responsible or Authorized Representative ............................... 10

3.2 Administrative and Maintenance Positions .............................................. 11

3.3.1 Compliance Summary ................................................................ 11

3.3.2 Compliance Documents ............................................................. 11

← All documents from this meeting