City of Pasadena
Transportation
Impact Fee Update —
Nexus Study
Prepared for:
City of Pasadena
June 2025
LA-23-3458.00
ATTACHMENT B
2 Table of Contents
Executive Summary ....................................................................................................................... 6 What is Transportation Impact Fee? ..................................................................................................................................... 6 Who pays the Transportation Impact Fee? ........................................................................................................................ 6 How is the Transportation Impact Fee calculated? ........................................................................................................ 6 How are fees assessed? ............................................................................................................................................................. 6
1. Introduction ............................................................................................................................... 7
1.1 Regulatory Context .............................................................................................................................................................. 7
1.2 Existing Transportation Impact Fee ............................................................................................................................... 8
2. Impact Fee Methodologies ...................................................................................................... 9
2.1 Fee Categories ....................................................................................................................................................................... 9
2.2 Fee Level Comparisons .....................................................................................................................................................12
3. Transportation Impact Fee Projects ...................................................................................... 18
4. Nexus Analysis ......................................................................................................................... 23
4.1 Methodology Overview ....................................................................................................................................................23
4.2 VMT Benefits .........................................................................................................................................................................24
4.3 Impact Fee Calculation .....................................................................................................................................................25
4.3.1 Growth Forecasts ....................................................................................................................................................25
4.3.2 Cost of Project List ..................................................................................................................................................26
4.4 Transportation Impact Fee ..............................................................................................................................................27
4.5 Findings: Compliance with Government Code Section 66001 .........................................................................32
5. Fee Implementation and Administration ............................................................................. 34
5.1 Administration Features and Costs ..............................................................................................................................34
5.2 Program Monitoring ..........................................................................................................................................................34
5.2.1 Annual Report ..........................................................................................................................................................34
5.2.2 Five-Year Report ......................................................................................................................................................35
3 Appendices
Appendix A: Impact Fee Program Transportation Project List Appendix B: AB-602 Calculations for Residential Units by Size Appendix C: Pasadena Travel Demand Forecasting Model Development Report
4 List of Figures
Figure 1. Transportation Impact Fees Per Dwelling Unit (DU) – Residential & Lodging Land Uses ................. 13 Figure 2. City of Fremont – Residential Transportation Impact Fees Per DU ............................................................ 14 Figure 3. Transportation Impact Fees Per Thousand Square Feet (KSF) – Industrial Land Uses ........................ 14 Figure 4. Transportation Impact Fees Per KSF – Office & Medical Office Land Uses ............................................. 15 Figure 5. Transportation Impact Fees Per KSF – Retail Land Uses ................................................................................. 15 Figure 6. Transportation Impact Fees Assessed for Other Land Uses (Burbank, Fremont, Culver City & Santa Monica) ............................................................................................................................................................ 16 Figure 7. Transportation Impact Fees Assessed on a Per Trip Basis ............................................................................. 17
List of Tables
Table 1: Residential Development Impact Fee Categories ............................................................................................... 10 Table 2: Non-Residential Development Impact Fee Categories ..................................................................................... 11 Table 3: City of Pasadena Infrastructure Projects ................................................................................................................ 19 Table 4: PM Peak Hour Traffic Volume Forecast Growth ................................................................................................. 26 Table 5: Project List Cost Estimates ........................................................................................................................................... 26 Table 6: Mobility Impact Fees per Average PM Peak Hour Trip .................................................................................... 27 Table 7: Equivalent Dwelling Units for Residential Uses per AB-602 .......................................................................... 29 Table 8: Transportation Impact Fees by Land Use Type ................................................................................................... 31 Table 9: Comparison of Existing and Proposed Transportation Impact Fees .......................................................... 32
5 This page intentionally left blank.
City of Pasadena Transportation Impact Fee Update
June 2025
6 Executive Summary
What is Transportation Impact Fee?
A Transportation Impact Fee (TIF) is a type of development impact fee created to address the impacts of new residents and workers utilizing transportation-related infrastructure, such as roads, intersections, bridges, as well as facilities that serve transit, pedestrians and/or non-motorized vehicles (e.g., trails, bike lanes, sidewalks, etc.). The fee anticipates and is aimed at addressing the impacts of growth on City streets, including protecting neighborhoods from increased traffic.
Who pays the Transportation Impact Fee?
Applicants of land use development and redevelopment projects—including residential, office, retail, and industrial developments—are responsible for paying Transportation Impact Fees.
How is the Transportation Impact Fee calculated?
The fee is determined through a Nexus Study conducted per the requirements of the Mitigation Fee Act.
Fees established herein follow the fundamental legal tenets of having an essential nexus (relationship) and rough proportionality to the impacts which the fee is designed to mitigate. The methodology ensures the fee maintains a legally required essential nexus (relationship) and rough proportionality to the impacts it aims to mitigate. The analysis establishes a connection between the transportation -related effects of future development and the infrastructure improvements necessary to accommodate increased demand.
The costs associated with these improvements are proportionally allocated based on the magnitude of anticipated growth.
How are fees assessed?
The fees are assessed based on the anticipated impact of new developments on the transportation infrastructure. The City of Pasadena Department of Transportation (DOT) administers the fee program and builds projects as fees are collected. The assessment process includes identifying the project's land use, calculating the net new units within the applicable land use category, and applying fees based on the adopted schedule. Developers are required to pay a one-time fee prior to receiving a Certificate of Occupancy. These impact fees apply exclusively to new development; however, developers must still conduct transportation studies and implement improvements if localized impacts are identified. The fee is subject to annual adjustments based on the Construction Cost Index.
City of Pasadena Transportation Impact Fee Update
June 2025
7 1. Introduction
The City of Pasadena (the “City”) is updating its city-wide Transportation Impact Fee (TIF) program to address the transportation needs of future development through 2035. The previous TIF was established in 2017 and had a horizon year of 2035. The updated program aims to ensure that new developments contribute their fair share of the cost of necessary transportation improvements using the City’s latest Travel Demand Forecasting Model (TDF Model, Appendix C) 1 while factoring in their effect on vehicle
miles traveled (VMT). The fees collected will help fund infrastructure projects, supplementing other sources like County sales tax measures and state or local grants. The program follows California's Mitigation Fee Act (AB 1600), which requires a direct nexus between development impacts and the fees imposed, ensuring they are proportional to the impact of the projects. The updated Transportation Impact Fee will use the new model data and be categorized based on land use. The list of transportation improvements and the methodology for calculating the TIF are detailed in the following sections of this report.
1.1 Regulatory Context
California Government Code
The California Government Code §§ 66000-66025, often referred to as the Mitigation Fee Act, governs how local governments can impose development impact fees. This legislation ensures that such fees are both legally defensible and equitable. The Mitigation Fee Act allows the City to adopt an ordinance that enables the fee and defines the program structure. The fee may be updated periodically when supported by a technical analysis and approved by City Council.
In establishing, increasing, or imposing a fee as a condition for the approval of a development project 2, Government Code §§ 66001(a) and (b) state that the local agency must:
• Identify the purpose of the fee.
• Identify how the fee is to be used.
• Determine how a reasonable relationship exists between the fee established and type of development project for which the fee is imposed.
• Determine how the need for the public facility relates to the type of development project for which the fee is imposed.
1 The City of Pasadena Travel Demand Forecasting Model was originally developed in 2011 and updated twice in 2013 and 2017. The latest model has been calibrated and validated to 2017 base year conditions using actual traffic counts, census data, Streetlight travel pattern data, and land use data compiled by City staff. The latest Model Development Report is available in Appendix C.
2 Development includes any land use activity that involves construction of residential, commercial, industrial, office, or other non-residential improvements which requires the issuance of a building permit. Such improvements are generally expected to create additional impacts to the City’s transportation infrastructure once completed through additional travel demand associated with the proposed use.
City of Pasadena Transportation Impact Fee Update
June 2025
8 • Demonstrate the relationship between the fee and the cost of the public facility.
Section 4.5 of this report summarizes findings complying with Government Code §§ 66001. Once the TIF update is adopted, this Nexus Study and the technical information it contains will be maintained and reviewed periodically by the City to ensure impact fee accuracy and to enable the adequate programming of funding sources. To the extent that transportation improvement requirements, costs, and development potential changes over time, the fee program will need to be updated.
California Assembly Bill 602
Effective January 1, 2022, AB 602 requires that impact fees levied on residential development must be calculated such that they are proportional to the square footage of future units. A nexus study must evaluate how existing and future residential development can be estimated by residential square feet or document why the use of residential square feet is not relevant as it would not appropriately reflect the relationship between the fee, facility demand, and residential land use. Section 4.3 outlines methodologies for implementing the AB 602 requirement in the TIF update.
1.2 Existing Transportation Impact Fee
City of Pasadena’s transportation improvement fee program was originally established in November 2006.
The most recent iteration of the adopted fee program was adjusted and adopted by City Council i n July 2017 (Ordinance No. 7309).
The existing Transportation Impact Fee Study identifies transportation improvements needed to support growth, including roads, public transit, bikeways, and pedestrian walkways. The cost of these improvements are distributed between future and existing development based on the benefits received.
The Fee Study divides land uses into five (5) categories: Single-Family Residential, Multi-Family Residential, Retail, Office, and Industrial. Chapter 2 examines the City's existing Transportation Impact Fee program in comparison to similar programs implemented by other jurisdictions.
Government Code Section 66016.5(a)(4) requires local agencies adopting increases to existing transportation impact fees review the assumptions of the nexus study supporting the original fee and evaluate the amount of fees collected under the original fee. Since City of Pasadena’s existing transportation impact fee will decrease across most land use categories (Table 9) following the implementation of proposed new fees, an assessment of the Existing Transportation Impact Fee is not required.
City of Pasadena Transportation Impact Fee Update
June 2025
9 2. Impact Fee Methodologies
This Chapter presents a comparison of the City of Pasadena’s existing Transportation Impact Fee (TIF) program with TIF programs from other comparable jurisdictions that were identified in consultation with Pasadena Department of Transportation staff. The jurisdictions that were selected for comparison include Burbank, Santa Monica, West Los Angeles3, Culver City, Orange, Anaheim, Fremont, and Palo Alto. The Cities of Glendale and Lancaster were evaluated for inclusion but were excluded from the analysis because the City of Glendale is currently in the process of updating its TIF program and the City of Lancaster’s TIF program serves to facilitate project-level VMT mitigation under CEQA, whereas the TIF programs in the City of Pasadena and the jurisdictions that were selected for comparison do not.
2.1 Fee Categories
Table 1 and Table 2 present the various development impact fee programs that have been adopted by each of the comparison jurisdictions for residential and non-residential land uses. As shown in the tables, each of the comparison jurisdictions assesses a transportation improvement fee on new residential and non-residential development. For residential development, parks & recreation fees are assessed in each of the jurisdictions, and fees for public art, public safety, and libraries are common. For non- residential development, several jurisdictions assess fees for public art, public safety, libraries, and affordable housing.
3 West Los Angeles comprises the West Los Angeles Transportation Improvement and Mitigation Specific Plan area.
Development projects that are proposed in this area pay distinct transportation improvement fees in addition to citywide impact fees for the City of Los Angeles in the categories of parks and recreation, affordable housing, and public art.
City of Pasadena Transportation Impact Fee Update
June 2025
10 Table 1: Residential Development Impact Fee Categories Fee Category Pasadena Burbank Santa
Monica West LA Culver City Orange Anaheim Fremont Palo Alto Year Adopted 2017 2022 2013 2019 2021 2020 1993 2021 2007 Transportation X X X X X X X X X
Residential
Parks & Recreation X X X X X X X X X
Public Art X X X X
Library X X X
Police X X X
Fire X X X X
Childcare X
Affordable Housing X X
Other IT Water
Demand Condo Tax Sanitation Capital
Facilities
Comm.
Facilities
Source: Fehr & Peers
City of Pasadena Transportation Impact Fee Update
June 2025
11 Table 2: Non-Residential Development Impact Fee Categories Fee Category Pasadena Burbank Santa
Monica West LA Culver City Orange Anaheim Fremont Palo Alto Year Adopted 2017 2022 2013 2019 2021 2020 1993 2021 2007 Transportation X X X X X X X X X
Residential
Parks & Recreation X X X
Public Art X X X X X
Library X X X
Police X X X
Fire X X X X
Childcare X
Affordable Housing X X X X
Other IT Water
Demand Commercial/I
ndustrial Tax Sanitation Capital
Facilities
Comm.
Facilities
Source: Fehr & Peers
City of Pasadena Transportation Impact Fee Update
June 2025
12 2.2 Fee Level Comparisons
Figure 1 shows the comparison of transportation impact fees for residential and lodging land uses across each of the comparison jurisdictions except for Fremont, which charges a residential fee for both single family and multifamily development on a per bedroom basis, and Palo Alto, which charges a transportation impact fee for residential and non-residential land uses on a per trip basis (per net new PM peak hour trip). Fee levels in Santa Monica differ according to the proximity of development projects to public transit. Because of this, the fee levels shown in Figure 1 reflect the average across the entire city.
Figure 2 shows the transportation fees for residential development in Fremont. Pasadena's residential transportation impact fees are the highest among compared jurisdictions for single-family uses. For multi- family uses, only West LA’s 'Apartment' and 'Condominium/Townhouse' categories exceed Pasadena’s current fee level.
Figure 3 shows the comparison of transportation impact fees for industrial land uses, Figure 4 shows the comparison for office and medical office land uses, and Figure 5 shows the comparison for retail land uses. For industrial land uses, Pasadena assesses a lower fee than all of the comparison jurisdictions except for the City of Orange. For office land uses, Pasadena assesses a lower fee than the other Los Angeles County jurisdictions, but higher than Fremont and the Orange County jurisdictions. For retai l land uses, Pasadena assesses a lower fee than all of the other Los Angeles County jurisdictions except for Burbank and West LA’s ‘less than 250 KSF’ category, but higher than Fremont and the Orange County jurisdictions.
Figure 6, Figure 7, and Figure 8 show the comparison of transportation impact fees in other jurisdictions for land uses not currently assessed in Pasadena or grouped under broader categories like retail and office. These land uses include hospitals, film studios, auto sales, schools (public, private, vocational/trade), religious facilities, research & development facilities, business parks, convalescent/nursing homes, and assisted living/congregate care facilities. The fee comparisons shown in these figures are presented for informational purposes should the City of Pasadena elect to update its TIF program to assess a fee for additional land uses beyond what is currently required from the existing TIF program. Figure 9 presents transportation impact fee comparisons for jurisdictions that assess a fee on a per trip basis, including Anaheim, Orange, and Palo Alto. It is important to note that the City of Orange only assesses a transportation impact fee on a per trip basis (per daily trip end) for atypical land uses that are not specified in the TIF program. In Anaheim, non-residential projects must pay a fee per peak hour trip end in addition to a fee that is unique by land use.
The fee schedules for these jurisdictions have been updated to reflect Fiscal Year 2025, except for the City of Orange (FY 2021), West LA (FY 2021), and Fremont (FY 2024), as FY 2025 data for these locations is not available online.
City of Pasadena Transportation Impact Fee Update
June 2025
13 Figure 1. Transportation Impact Fees Per Dwelling Unit (DU) – Residential & Lodging Land Uses
Note: Single family and multi-family fees for Santa Monica represent the citywide average. Affordable housing fees for Burbank reflect the average across both minimum-required and above-minimum affordable units.
$- $2,000 $4,000 $6,000 $8,000 $10,000 $12,000
Single Family
Multi-Family
Affordable Single Family
Affordable Multi-Family
Apartment/Condominium/Townhouse
Lodging (Per Room)
Pasadena Burbank Santa Monica Culver City Orange Anaheim - East of 55 Freeway Anaheim West LA City of Pasadena Transportation Impact Fee Update
June 2025
14 2
Figure 2. City of Fremont – Residential Transportation Impact Fees Per DU
Figure 3. Transportation Impact Fees Per Thousand Square Feet (KSF) – Industrial Land Uses
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
0 (studio) 1 bedroom 2 bedrooms 3 bedrooms 4 bedrooms >4 per bedroom $- $2,000 $4,000 $6,000 $8,000 $10,000 $12,000
Pasadena
Burbank
Santa Monica
Culver City
West LA
Orange
Anaheim
Fremont
Industrial Light Industrial Manufacturing Warehouse/Self-Storage Mini-Warehouse City of Pasadena Transportation Impact Fee Update
June 2025
15 Figure 4. Transportation Impact Fees Per KSF – Office & Medical Office Land Uses
Note: Fees for West LA office and medical office projects between 50 – 250 KSF are interpolated.
Figure 5. Transportation Impact Fees Per KSF – Retail Land Uses
Note: Fees for West LA office and medical office projects between 250 – 800 KSF are interpolated $- $10,000 $20,000 $30,000 $40,000 $50,000
Pasadena
Burbank
Santa Monica
Culver City
West LA (< 50 KSF)
West LA (> 250 KSF)
Orange
Anaheim
Fremont
Office
Medical Office
$- $5,000 $10,000 $15,000 $20,000 $25,000 $30,000 $35,000 $40,000 Pasadena
Burbank
Santa Monica
Culver City
West LA (< 250 KSF)
West LA (> 800 KSF)
Orange
Anaheim
Fremont
City of Pasadena Transportation Impact Fee Update
June 2025
16 2
Figure 6. Transportation Impact Fees Assessed for Other Land Uses (Burbank, Fremont, Culver City & Santa Monica)
Note: Fees for Culver City film studio projects represent the average of two categories - Active Production and Passive Production. $- $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 Auto Sales (per KSF)
Private School/College (per student)
Religious Facilities (per KSF)
R&D (per KSF)
Business Park (per KSF)
Convalescent Home/Nursing Home (per KSF)
Assisted Living/Congregate Care Facility (per KSF)
Hospital (per KSF)
Film Studio (per KSF)
Schools (K-12, per KSF)
Vocational Trade School (per KSF)
Burbank Fremont Culver City Santa Monica
City of Pasadena Transportation Impact Fee Update
June 2025
17 Figure 7. Transportation Impact Fees Assessed on a Per Trip Basis
Note: In Anaheim, non-residential projects must pay a fee per peak hour trip end in addition to a fee that is unique by land use.
$- $5,000 $10,000 $15,000
Orange - Atypical Land Uses (Per Daily Trip End)
Palo Alto - Citywide (Per Net New PM Peak Hour Trip)
Anaheim - Non-Residential Projects (Per Peak Hour Trip
End)
City of Pasadena Transportation Impact Fee Update
June 2025
18 3. Transportation Impact Fee
Projects
The City of Pasadena’s transportation infrastructure projects for the fiscal years (FY) 2026 to 2030 will be funded (in part) through the City’s fee program. Projects have been identified through the City’s budget cycle, planning efforts, and community needs. Key Capital Improvement Program (CIP) project categories and examples are shown below:
1. Active Transportation and Complete Streets: The improvements include new bikeways in Class II, III, or IV based on needs identified through the City’s Bicycle Transportation Action Plan , pedestrian needs identified through the Pasadena Pedestrian Transportation Action Plan (PTAP), and safety enhancement needs from the Local Road Safety Plan (LRSP). o Pasadena Bicycle Program FY 2026-2030: Focused on improving the city's bicycle infrastructure, this project has a proposed budget of $500,000. o Pedestrian Crossing Enhancements Program FY 2021-2028: Program is designed to improve pedestrian crossings across the city, with a proposed budget of $4.25 million.
2. Traffic Operations, Traffic Signals, and Intelligent Transportation Systems (ITS): The improvements include safety-focused multimodal improvements such as pedestrian hybrid beacons (HAWKS).
o Transportation System Safety Enhancements Project: A comprehensive initiative to manage traffic and enhance safety for pedestrians and cyclists, with a proposed budget of approximately $1.1 million.
3. Transit: These projects include replacement to existing fleets and innovative sustainable mobility improvements.
o Bus Stop Improvement Program: A comprehensive program to upgrade bus stops with accessibility and safety enhancements, with a proposed budget of approximately $4.3 million.
4. Streets and Streetscapes: These projects include general roadway improvements, Specific Plans and granular enhancements to specific corridors.
o Pedestrian Safety Enhancements on Oak Knoll Ave: Focuses on improving accessibility along the right-of-way with a proposed budget of $300,000.
City of Pasadena Transportation Impact Fee Update
June 2025
19 These projects are essential to Pasadena’s long-term transportation planning goals in the General Plan, addressing various aspects like cycling infrastructure, pedestrian safety, and roadway efficiency. The full list of eligible projects through the City’s fee program is shown in Table 3.
Table 3: City of Pasadena Infrastructure Projects
Project
Category Project Name Type1 Source Document
& Page Number2
Active Transportation / Complete Streets
Pasadena Bicycle Program FY 2026-2030 Bike CIP (5.1)
Citywide Neighborhood Traffic Management Program FY
2026-2030 Bike/Ped/Roadway CIP (5.3)
Arterials Speed Management Program FY 2026-2030 Roadway Capacity CIP (5.4) Citywide Complete Streets Program FY 2025-2029 Bike/Ped/Roadway CIP (5.5) Pedestrian Transportation Action Plan - Outreach and
Conceptual Design Ped CIP (5.8) - 75511
Citywide Continental Crosswalk Implementation Ped CIP (5.12) - 75917 Compete Streets Project - Mountain St at Sierra Bonita Ave and Sinaloa Ave - Design Phase Ped/Roadway CIP (5.13) - 75107 Rose Bowl Pedestrian & Bicycle Access Study Ped/bike CIP (5.14) Two-Way Traffic Conversion - Mentor Ave from Walnut St to Colorado Blvd - Feasibility Study Roadway CIP (5.16) - 75918 Pedestrian Crossing Enhancements Program FY 2021-2028 Ped CIP (5.17) - 75112 El Molino Avenue Quick-Build Greenway Demonstration
Project Bike CIP (5.18)
Complete Streets Project - Rosemont Ave Pedestrian Safety Enhancements from Seco St to Orange Grove Blvd - Design Phase
Ped/Roadway CIP (5.48)
Arroyo Link Walking and Biking Path Ped/bike CIP (5.49) Traffic Operations, Traffic Signals, ITS Mobility Corridor Improvements FY 2026-2030 Roadway CIP (5.19) Old Pasadena Traffic Improvement - FY 2026-2030 Roadway CIP (5.20) ITS Equipment Upgrades/Replacement - FY 2021-2028 Ped CIP (5.21) - 75117 Citywide Leading Pedestrian Interval/Accessible Pedestrian Signal (LPI/APS) Implementation Program FY 2025-2029 Ped CIP (5.22) Implementation of Citywide Transportation Performance
Monitoring Network Roadway CIP (5.23) - 75602
Installation of Traffic Signal and Curb Extensions at Sierra Bonita Ave and Orange Grove Ped/Roadway CIP (5.30) - 75134 Installation of Pedestrian Hybrid Beacons (HAWKs) at Various Locations Ped CIP (5.35)
City of Pasadena Transportation Impact Fee Update
June 2025
20 Project
Category Project Name Type1 Source Document
& Page Number2
Mobility Hubs & First/Last Mile Improvements Ped CIP (5.36) Signal Preemption Equipment at Traffic Signals Citywide - Phase II Roadway CIP (5.38) - 75916
Transportation System Safety Enhancements Project – FY
2021-2028 Roadway CIP (5.39) - 75115
Transit
Purchase of Zero-Emission Pasadena Transit Vehicles and Supporting Infrastructure Transit CIP (5.40)
Purchase of Zero-Emission Pasadena Dial-A-Ride Vehicles and Supporting Infrastructure Transit CIP (5.41)
Systemwide Bus Zone Enhancements Transit CIP (5.42)
Purchase of Replacement Transit Vehicles and Expansion
Fixed-Route Transit Vehicles Transit CIP (5.43) - 75085 Purchase of Dial-a-Ride Vehicles Transit CIP (5.44) - 75086 Construction of Transit Operations Maintenance Facility Transit CIP (5.45) - 75707 Bus Stop Improvement Program Transit CIP (5.46) - 75900 Streets & Streetscape
Intersection Improvements at Colorado Blvd and Garfield Ave Ped/Roadway CIP (2.14) Pedestrian Safety Enhancements on Oak Knoll Ave Ped CIP (2.15) Improvement of Green Street - Orange Grove Blvd to Hill Ave Roadway CIP (2.16) Safe Routes to School - Sidewalk Repairs Ped CIP (2.17) Civic Center/Mid-Town Public Improvements & Related
Components - Phase II Ped/Roadway CIP (2.18)
New York Drive Bridges - Preventive Maintenance Misc CIP (2.19) Arroyo Boulevard Bridge - Seismic Retrofit Misc CIP (2.21) Annual Citywide Street Resurfacing and ADA Improvement
Program FY 2026 Ped/Roadway CIP (2.1)
Curb Ramp ADA Improvements Program FY 2022 - 2026 Ped CIP (2.4) - 73937 San Rafael Bridge Seismic Retrofit Misc CIP (2.9) - 73946 Street Lighting Program FY 2024-2028 Misc CIP (3.4) - 74422 Other
Playhouse Village - Colorado Blvd Enhancements from
Madison Ave to Oak Knoll Ave - Feasibility Study Ped/Roadway CIP (5.51) Playhouse Village - N Lake Ave. from E Colorado Blvd. to Corson St. - Feasibility Study Ped/Roadway CIP (5.52)
Traffic Signal and Pedestrian Improvements on Kinneloa Ave at Del Mar Blvd Ped/Roadway CIP (5.53)
City of Pasadena Transportation Impact Fee Update
June 2025
21 Project
Category Project Name Type1 Source Document
& Page Number2
Traffic Signal at Electronic Dr and Sierra Madre Villa Blvd Roadway CIP (5.54) Mountain Street Curb Extension Ped CIP (5.55)
Complete Streets Project - Sunnyslope Ave at Estado St - Construction Phase Ped/Roadway CIP (5.56)
Local Roadway Safety Plan (LRSP)
Retro-reflective backing plates Roadway LRSP (77)
Nearside Signals Ped LRSP (77)
Rectangular Rapid Flashing Beacons (RRFB) Ped LRSP (77) Regulatory Signs Roadway LRSP (77)
Lake Ave & Maple St High Visibility Crosswalks Ped LRSP (78) El Molino Av & Villa St High Visibility Crosswalks Ped LRSP (78) Optional Restriping Roadway LRSP (79)
Fair Oaks Ave & Maple Street Safety Improvements Roadway LRSP (77) Washington Boulevard Safety Improvements btwn Forest Ave and Catalina Ave Roadway LRSP (77)
Del Mar Boulevard Safety Improvements btwn Los Robles Ave and east City Limits Roadway LRSP (77)
Lake Ave & Washington Bl Optional Safety Enhancements Roadway LRSP (78) Fair Oaks Ave & Washington Bl Optional Safety
Enhancements Roadway LRSP (78)
Fair Oaks Ave & Orange Grove Bl Optional Safety
Enhancements Roadway LRSP (78)
Colorado Bl & Sierra Madre Bl Optional Safety Enhancements Roadway LRSP (78) Arroyo Pkwy & Green St Optional Safety Enhancements Roadway LRSP (78) Lake Ave btwn Mountain and California Optional Safety
Enhancements Roadway LRSP (79)
Los Robles Ave btwn Washington and Maple Optional Safety Enhancements Roadway LRSP (79)
Pedestrian
Transportation
Action Plan (PTAP)
Allen Avenue Pedestrian Improvement Project from north City limit to Colorado Blvd. Ped PTAP
(Appendix F)
Del Mar Boulevard Pedestrian Improvement Project from
Pasadena Avenue to east City limit Ped PTAP
(Appendix F)
Fair Oaks Avenue Pedestrian Improvement Project from north City limit to south City limit Ped PTAP
(Appendix F)
City of Pasadena Transportation Impact Fee Update
June 2025
22 Project
Category Project Name Type1 Source Document
& Page Number2
Foothill Boulevard Pedestrian Improvement Project from
Walnut Street to east City limit Ped PTAP
(Appendix F)
Lake Avenue Pedestrian Improvement Project from north City limit to Colorado Boulevard Ped PTAP
(Appendix F)
Lincoln Avenue Pedestrian Improvement Project from north City limit to Washington Boulevard Ped PTAP
(Appendix F)
Los Robles Avenue Pedestrian Improvement Project from
north City limit to Walnut Street Ped PTAP
(Appendix F)
Raymond Avenue Pedestrian Improvement Project from
Colorado Boulevard to E Glenarm Street Ped PTAP
(Appendix F)
San Gabriel Boulevard Pedestrian Improvement Project from Maple Street to California Boulevard Ped PTAP
(Appendix F)
Washington Boulevard Pedestrian Improvement Project from Lincoln Avenue to Lake Avenue Ped PTAP
(Appendix F)
Note:
1. Ped = Pedestrian, Misc = Miscellaneous
2. CIP = Capital Improvement Program (FY 2026), LRSP = Local Road Safety Plan (2022), and PTAP = Pedestrian Transportation Action Plan (2024)
City of Pasadena Transportation Impact Fee Update
June 2025
23 4. Nexus Analysis
The purpose of a nexus study is to establish the relationship, referred to as the “nexus ,” between anticipated new development and the need for new and expanded major public facilities. After establishing the nexus, the transportation fees to be levied for various land use types are calculated based on the proportionate share of the total facility use.
4.1 Methodology Overview
The improvements contained in the transportation project list will provide travel options for those driving, biking, and walking as part of a transportation system that is consistent with local and statewide policies .
Growth in residents and employees is expected in the City of Pasadena with or without these transportation projects and the transportation impact fee program does not change the amount of anticipated growth. Pasadena’s General Plan Mobility Element guides the continuing development of the transportation system to support planned growth. The anticipated development pattern will increase the use of the City’s transportation system, including demand for local and regional roadways as well as pedestrian, bike, and public transit infrastructure. The impact fee is used to pay for transportation projects needed to accommodate the demands on the transportation system created by new development. These transportation projects were identified in or tied to guiding principles, objectives and/or policies in the General Plan Mobility Element. One of the goals of the impact fee is to provide improvements that result in the production of fewer vehicle miles traveled (VMT) on a “per capita/employee” basis.
VMT measures miles traveled by all vehicles (e.g., private automobiles, trucks, and buses) in the study area. In comparison to vehicle trips, VMT accounts for a vehicle’s true impact on the transportation system as it considers both the number of trips a driver makes along with the distance traveled during each of those trips. VMT will likely increase with the addition of new residents and employees, the City aims to reduce VMT on a “per capita/employee” basis with land use policies that help Pasadena resid ents and workers meet their daily needs within a short distance from home, reducing trip lengths, and by encouraging development in areas with access to various modes of transportation other than auto
4. The City’s General Plan prioritizes VMT reduction as a key sustainability goal. Its guiding principles emphasize a livable community with enhanced mobility options beyond automobiles. The Mobility Element outlines four objectives for transportation system management: Promote a livable and economically strong community, encourage non-auto travel, protect neighborhoods by discouraging traffic from passing through neighborhoods, and manage multimodal corridors to improve citywide transportation services5. Projects aligned with these objectives will support the VMT reduction goal.
4 City of Pasadena, Transportation Impact Analysis Guidelines, April 2022. 5 City of Pasadena, General Plan Mobility Element, August 15.
City of Pasadena Transportation Impact Fee Update
June 2025
24 4.2 VMT Benefits
The VMT benefits of transportation projects in Table 3 were assessed through two pathways: (1) alignment with Mobility Element objectives and other City-adopted plans and guidelines, and (2) anticipated VMT reduction benefits documented in the California Air Pollution Control Officers Association’s Quantifying Greenhouse Gas Mitigation Measures (CAPCOA) 6. Beyond VMT reduction, many projects also improve accessibility, mode share, and safety, with additional benefits identified where applicable.
Active Transportation/Complete Streets, Local Roadway Safety Plan (LRSP), and Pedestrian Transportation Action Plan (PTAP)
These projects include new bikeways in Class II, III, or IV based on needs identified through the City’s Bicycle Transportation Action Plan, pedestrian needs identified through the Pasadena Pedestrian Transportation Action Plan (PTAP), and safety enhancement needs from the Local Road Safety Plan (LRSP).
According to CAPCOA, expanding bikeway network encourages a mode shift from vehicles to bicycles, which contributes to up to 0.5% VMT reduction. Providing pedestrian network improvement encourages people to walk instead of drive, which results in up to 6.4% VMT reduction. In addition, Proximity and Quality of Bicycle Network and Pedestrian Accessibility are two of the City’s CEQA transportation metrics.
Implementing these projects will help the City improve measures of bike facility access and average walkability.
Traffic Operations, Traffic Signals, ITS
These projects include citywide signal and ITS upgrades to effectively manage the transportation network through design and technology solutions. While there are often emissions reductions associated with these types of projects as running time per mile decreases, there are no associated VMT reductions.
Although in some cases, these projects can induce additional VMT by lowering the cost and delay of traveling by vehicle, majority projects in the list are safety-focused multimodal improvements, such as the Transportation System Safety Enhancements Project, Citywide Leading Pedestrian Interval/Accessible Pedestrian Signal (LPI/APS) Implementation Program, and Installation of Pedestrian Hybrid Beacons (HAWKs). In addition, the City’s strategic combination of roadway improvements and VMT-reducing projects will help mitigate the effects of induced travel.
Transit
Transit projects include bus stop improvements, the purchase of replacement, expansion and zero- emission vehicles for fixed-route transit and Dial-A-Ride services. These initiatives support the Land Use Element by enhancing non-auto transportation options, improving access to neighborhoods, community centers, and mixed-use boulevards. They also address mobility needs for non-drivers, consistent with Mobility Element Policy 1.5-Consider the mobility needs of the disabled, students and especially seniors,
6 California Air Pollution Control Officers Association (CAPCOA), Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity, 2021.
City of Pasadena Transportation Impact Fee Update
June 2025
25 when designing new infrastructure and developing transportation programs. According to CAPCOA, extending transit network coverage or hours encourage the use of transit and therefore reduce VMT and associated GHG emissions up to 4.6%.
Streets and Streetscapes, Other
These projects include general roadway improvements with a focus on enhancing walkability and pedestrian safety. These projects align with Mobility Element policies, such as Policy 1.2 Promote greater linkages between land uses and transit, as well as non-vehicular modes of transportation to reduce vehicular trip related emissions, and Policy 1.11 Design Streets to reflect the mobility needs of the adjacent land use context to support healthy activities such as walking and bicycling.
4.3 Impact Fee Calculation
The impact fees were computed as follows:
• The Pasadena TDF Model was utilized to determine the anticipated growth within the City by 2035.
• The number of new PM Peak Hour vehicle trips generated by the aforementioned growth was calculated.
• A portion of the total costs (approximately 12.1%) of the Pasadena mobility fee project lists were divided by the total number of new trips to determine the cost per PM peak hour trip. • The percent of new trips generated by various land use types and trip length characteristics by land use were used to calculate the fees to account for VMT.
Each of these steps is explained in further detail below.
4.3.1 Growth Forecasts
The City of Pasadena TDF Model, a detailed and validated model for the City, provides the ability to evaluate the transportation system, generate performance measures for land use and transportation analysis, provide information on regional pass-through traffic versus locally generated trips, and graphically display these results. The model captures planned growth in the city, and is sensitive to emerging land use trends through improved sensitivity to built environment variables. The model forecasts AM and PM peak period daily vehicle and transit flows on the transportation network in the city.
The latest City of Pasadena TDF Model was used for nexus analysis, which forecasts the City’s General Plan build-out conditions in Future Year 2035. A model select zone run was conducted to isolate traffic volumes on the roadway network associated with anticipated growth within the City. The project team reviewed the incremental growth in traffic volumes that occurs either through or in the vicinity of transportation improvements in the project list. The most intensely impacted corridors and locations that have projects associated with them were identified and the fair share was determined by comparing the relationship to the existing baseline traffic. Table 4 summarizes the total PM peak hour volume forecasts City of Pasadena Transportation Impact Fee Update
June 2025
26 associated with Anticipated City Growth in 2024 Baseline, 2035 Future Year, and the fair share allocation of the new development.
Table 4: PM Peak Hour Traffic Volume Forecast Growth
Scenarios Total Traffic Volumes Generated by Anticipated Growth along/on Project Locations
[A] 2024 Baseline 65,523
[B] 2035 Future Year 73,424
[C] Volume Change 7,901
[D] New Development % Fair Share
(D = C/A) 12.1%
Source: Fehr & Peers, 2025.
4.3.2 Cost of Project List
Detailed project cost estimates were prepared for the transportation improvements in the project list, as shown in Appendix A. The cost estimates were based on the capital costs required to construct the projects. The transportation impact fee program only takes into account the unfunded project costs since many of these projects are partially funded by other grants or funding sources. Table 5 summarize the total costs along with unfunded project costs for each category of project in the mobility fee project list.
Costs may not represent the total expenses, especially for segmented or phased projects. Additionally, the transportation impact fee program has limitations, such as restrictions on addressing existing deficiencies, and does not cover all improvements within the City. For instance, Off-Street Parking Facility Maintenance and Repair Project, Annual ADA Citywide Sidewalk Improvement Program FY 2026 - 2030, and Miscellaneous Sidewalk Repair Program FY 2026 – 2030 in the CIP are excluded from the project list.
An administrative fee of 5% was added to the project list cost to provide oversight and implementation of the fee program by City of Pasadena DOT. Therefore, the total project costs including 5% administrative fee would be approximately $360 million.
Table 5: Project List Cost Estimates
Project Category Unfunded Cost Estimate % of Total Project List Cost Active Transportation/Complete Streets $106,782,725 31% Traffic Operations, Traffic Signals, ITS $36,134,721 10% Transit $98,299,675 29%
Streets and Streetscapes $51,323,555 15%
Other $3,672,000 1%
Local Roadway Safety Plan (LRSP) $6,735,123 2%
City of Pasadena Transportation Impact Fee Update
June 2025
27 Project Category Unfunded Cost Estimate % of Total Project List Cost Pedestrian Transportation Action Plan (PTAP) $41,221,036 12% Total Cost Estimate $344,168,835 100%
Total Project Cost (Include 5% Admin Fee) $361,377,277 N/A Source: City of Pasadena, 2025.
4.4 Transportation Impact Fee
As explained previously, fee programs require new development to contribute a fair share to complete regional improvements to mitigate the cumulative impacts of their projects to traffic conditions. The traffic volume forecast shows a 12.1% growth from existing conditions to future conditions in the PM peak hour as a result of new development. As shown in Table 6, new development would be responsible for funding the fair share (12.1%) of the approximately $360 million of the City’s planned transportation improvements contained in the project list, which would be approximately $44 million. The City will need to use alternative funding sources to fund existing development’s share of the planned transportation improvements. Potential sources of revenue include but are not limited to existing or new general fund revenues, existing or new taxes, special assessments, and grants. The City’s impact fees were calculated by dividing the fair-share allocation (12.1%) of the project list costs by the growth of PM peak hour trips.
Table 6 presents the average “per trip” fee for the initial year of the fee program update. Transportation impact fees will be paid by a developer as a one-time fee prior to the issuance of certificate of occupancy.
Table 6: Mobility Impact Fees per Average PM Peak Hour Trip Measure Pasadena
[E] Total Project Cost (Include 5% Admin Fee) $361,377,277 [F] 12.1% of Total Cost
(F = E * 12.1%, rounded to the nearest integer) $43,726,651 [C] PM Traffic Volume Growth (Vehicle Trips) 7,901
[H] Average Cost per PM Peak Hour Trip
(H = F/C, rounded to the nearest integer) $5,534
Following the calculation of the average “per trip” cost, additional variables were added to the fee calculations to further account for the transportation impacts of various land use types. • PM Peak Hour Trip Generation: ITE trip rates were used to estimate the number of trips by land use type to determine the equivalent fee on a per unit or square footage basis. • Average Vehicle-Trip Length: The distance drivers are willing to travel is largely dependent on the purpose of their trip. For example, a person traveling to work may be willing to commute 10 miles each day (20 miles of total driving) but choose to shop and dine in their local comm unity, resulting in shorter trips. The average vehicle trip lengths for various land use types (i.e., various trip types) are generated from the Pasadena TDF model.
City of Pasadena Transportation Impact Fee Update
June 2025
28 The average trip length data was used to generate a VMT factor for each land use type. The VMT factor was based on the average trip length generated by a single-family household. Since single family households generate different trip types, such as work, school and shopping trips, they are thought to reflect an average of a variety of trip types. Therefore, the VMT factor for a single - family household is 1.0, and uses with longer average trip lengths are greater than 1.0 while uses with shorter trip lengths, such as locally serving retail, are lower than 1.0. • Percent of New Vehicle-Trips: Trips generated by housing, employment centers and schools are considered to generate all “new” trips. However, a portion of trips associated with retail uses are not considered to be new trips; these trips are often referred to as “pass-by” trips. Pass-by trips are vehicles that are already traveling along a corridor that stop at a use on the way to their ultimate destination. For example, a person traveling from work to home may stop at a grocery store located along the corridor for a gallon of milk. In this situation, the grocery store is not generating a new trip as that vehicle would have already been traveling along the roadway. The pass-by trip credits are reflected in the fee calculations. • Residential Fee based on Unit Size: Assembly Bill (AB) 602 requires impact fee programs to establish fees for residential uses based on the size of the unit. Given that trip generation rates for residential uses have traditionally been calculated on a ‘per unit’ basis regardless of size, additional data was collected to estimate the number of vehicle trips based on household size (i.e., square feet, SF). Data from the National Household Travel Survey 7 and American Housing
Survey8 was used to develop trip rates based on unit size for single family housing. Using data that represents the State of California, the trip generation based on household size was estimated based on the following:
◦ The average daily trips per household were compiled based on the number of persons per household.
◦ The number of persons per household based on the size (SF) of the unit was then compiled. The data was grouped into four ranges for single family units: 1) Less than 2,000 SF, 2) 2,000 – 2,999 SF, 3) 3,000 – 3,999 SF, and 4) 4,000 SF or greater. ◦ According to the City of Pasadena, the median size of a new single-family home in Pasadena is 2,000 SF. Therefore, single family homes in the 2,000 – 2,999 SF size range were considered to be the typical size for a new home and used to create an Equivalent Dwelling Unit (EDU) factor for each of the size ranges noted above.
◦ The same methodology was applied for multi-family units with a smaller size range considered based on typical product type: 1) 800 SF or Less, 2) 801 – 1,600 SF, 3) Greater than 1,600 SF. Multi-family units in the 801 – 1,600 SF size range were considered to be the typical size for a new unit and used to create an EDU factor for the remaining size ranges. ◦ Table 7 summarizes the EDU factors for single family and multi-family units applied to the impact fees. Appendix B contains detailed calculations.
7 2017 National Household Travel Survey California Add-On. 8 2021 California American Housing Survey.
City of Pasadena Transportation Impact Fee Update
June 2025
29 Table 7: Equivalent Dwelling Units for Residential Uses per AB-602 Residential Type & Size Range Average Persons per
Household Average Trips EDU
Single Family Units
< 2,000 SF 2.63 8.44 86%
2,000 – 2,999 SF 3.13 9.8 100%
3,000 – 3,999 SF 3.24 10.11 103%
≥ 4,000 SF 3.5 10.74 110%
Multi-Family Units
≤ 800 SF 2.07 6.9 79%
801 – 1,600 SF 2.74 8.73 100%
≥ 1,601 SF 3.02 9.53 109%
Notes:
EDU = Equivalent Dwelling Unit. EDUs for single family units and multi-family units are calculated separately within their respective categories and are not directly comparable across categories.
Data compiled from 2017 National Household Travel Survey California Add-On and 2021 California American Housing Survey. • Accessory Dwelling Units (ADUs): An updated process for assessing fees on ADUs was established as part of Senate Bill (SB) 13. This legislation only allows a fee to be assessed on ADUs that are larger than 750 square feet. In order to be consistent with the procedures in the Planning Department, the City of Pasadena DOT will only assess a fee on ADUs that are greater than 800 square feet. In addition, the fee needs to be proportional to the size of the primary dwelling unit on the parcel. For example, if a 1,000 square foot ADU is proposed on a parcel with a 2,500 square foot primary residential unit, the size of ADU is 40 percent (1,000 ÷ 2,500 = 0.4) of the size of the primary dwelling unit. Then the fee assessed to the ADU would be 40 percent of the fee for a single-family residential unit in the 2,000 to 2,999 size range; $5,202 fee for units in applicable size range × 0.4 = $2,080.8 fee for ADU.
• Government Code Section 66005.19: This section requires local agencies to set reduced traffic impact fees for housing developments located within transit priority areas that are scheduled to
9 Government Code Section 66005.1 (a) – When a local agency imposes a fee on a housing development pursuant to Section 66001 for the purpose of mitigating vehicular traffic impacts, if that housing development satisfies all of the following characteristics, the fee, or the portion thereof relating to vehicular traffic impacts, shall be set at a rate that reflects a lower rate of automobile trip generation associated with such housing developments in comparison with housing developments without these characteristics, unless the local agency adopts findings after a public hearing establishing that the housing development, even with these characteristics, would not generate fewer automobile trips than a housing development without those characteristics:
(1) The housing development is located within a transit priority area and the major transit stop, if planned, is programmed to be completed before or within one year from the scheduled completion and occupancy of the housing development.
(2) Convenience retail uses, including a store that sells food, are located within one-half mile of the housing development.
(3) The housing development provides either the minimum number of parking spaces required by the local ordinance, or no more than one onsite parking space for zero- to two-bedroom units, and two onsite parking spaces for three or more bedroom units, whichever is less.
City of Pasadena Transportation Impact Fee Update
June 2025
30 be completed within a year of the housing development. These developments must meet specific criteria such as proximity to convenience retail (within ½ mile) and parking restrictions. If these criteria are met, local agencies cannot impose higher fees for vehicular traffic impacts. For City of Pasadena, most of the forecast development of housing projects used to calculate the general fees are already located within transit priority areas, are within one-half mile of convenience retail uses, and provide minimum amounts of parking. Therefore, the general fee structure assumes these projects will have lower VMT impacts. Accordingly, the City expects that few multi-family housing projects would be eligible for additional TIF reductions, because the fee already accounts for a lower rate of automobile trip generation.
The updated transportation impact fees by land use type for the initial year of the fee program are shown in Table 8. As shown, the transportation impact fee for residential uses ranges from $1,705 for a median size multi-family residential unit to $5,722 for a median size single-family unit. For commercial uses, the impact fee ranges from $1.15 per SF for light industrial uses to $20.66 per SF for medical office uses. Some uses, such as ADUs that are 800 square feet or smaller, affordable housing, government buildings, religious uses, and parking structures, were excluded from the TIF analysis calculations, as the City did not wish to impose TIFs on those uses. Compared to the existing transportation impact fees, the updated transportation impact fees decreased across most land use categories, except for m edical office uses (Table 9).
City of Pasadena Transportation Impact Fee Update
June 2025
31 Table 8: Transportation Impact Fees by Land Use Type Land Use Category Unit1 ITE Code2 PM Trip
Rate2
EDU/
% New Trips3
Trip
Length
VMT
Factor Fee per Unit4
Residential
Single Family DU 210 0.94 100%
17.5 1.00
$5,202 per DU
< 2,000 SF 86% $4,474 per DU
2,000 – 2,999 SF 100% $5,202 per DU
3,000 – 3,999 SF 103% $5,358 per DU
≥ 4,000 SF 110% $5,722 per DU
Multi-Family DU 221 0.39 100%
17.5 1.00
$2,158 per DU
≤ 800 SF 79% $1,705 per DU
801 – 1,600 SF 100% $2,158 per DU
≥ 1,601 SF 109% $2,352 per DU
ADU [>800 SF] DU Proportional to single family unit
Non-Residential
Lodging5 Room 310 0.59 100% 7.8 0.44 $1,437 per Room
Retail/Service SF 821 9.03 70% 6.0 0.34 $11.89 per SF
Office SF 710 1.44 100% 16.6 0.95 $7.57 per SF
Medical Office5 SF 720 3.93 100% 16.6 0.95 $20.66 per SF Hospital5 SF 610 0.86 100% 6.0 0.34 $1.62 per SF
Research and
Development5 SF 760 0.98 100% 16.6 0.95 $5.15 per SF
Light Industrial SF 110 0.65 100% 5.7 0.32 $1.15 per SF Notes:
1) Units = Dwelling Units (DU), Hotel (Rooms), and Square Feet (KSF). 2) Trip Generation, 11th Edition, Institute of Transportation Engineers. Setting/Location: General Urban/Suburban; Not Close to Rail Transit. PM peak hour trip rate per DU, Room, or KSF.
3) Pass-by Trips are accounted for retail uses.
4) Impact Fee = [PM Trip Rate] x [EDU/% New Trips] x [VMT Factor] x [Average Cost per PM Trip] 5) The study resulted in the designation of updated land use categories to better define proposed development and the establishment of updated fees in compliance with legislation passed within the past four years.
City of Pasadena Transportation Impact Fee Update
June 2025
32 Table 9: Comparison of Existing and Proposed Transportation Impact Fees Existing TR/TIF Category Current FY 2025 Rate Proposed TR/TIF Rate Single family (per dwelling unit) $11,141.89 $4,474 - $5,722 Multi-family (per dwelling unit) $4,314.10 $1,705 - $2,352 Industrial use (per square foot) $1.38 $1.15
Office use (per square foot) $10.14 $7.57
Retail use (per square foot) $13.48 $11.89
*Lodging use (per room) $13.48/SF (treated as retail) $1,437 per room *Medical Office use (per square foot) $10.14 (treated as office) $20.66 *Hospital use (per square foot) $10.14 (treated as office) $1.62 *R&D use (per square foot) $10.14 (treated as office) $5.15 Note: Asterisk (*) indicates recategorized land use.
4.5 Findings: Compliance with Government Code Section 66001 This section summarizes findings demonstrating the nexus between fees imposed, the use of the fees, and the development projects on which the fees are imposed, in compliance with Government Code Section 66001.
Identify the Purpose of the Fee
Fees collected from the TIF program funds the implementation or construction of transportation improvements in support of livability, neighborhood protection, and mobility goals as identified in the current City’s General Plan Land Use and Mobility Elements and to accommodate new development’s additional demand on roadways and non-vehicular transportation infrastructure.
Identify how the fee is to be used.
Funds collected will be used to implement the municipal transportation projects ( Table 3) required to address vehicular and non-vehicular demand generated by new development, improving the infrastructure for pedestrians and bicyclists, and increasing frequency of service on Pasadena Transit System.
Determine how a reasonable relationship exists between the fee established and type of development project for which the fee is imposed.
Pasadena’s General Plan projects growth in residents and employees by 2035. The anticipated development pattern is expected to elevate the demand for the City’s transportation system, including increased traffic, VMT, transit ridership, and bicycle and pedestrian activity.
City of Pasadena Transportation Impact Fee Update
June 2025
33 Furthermore, this growth exacerbates safety risks by increasing potential conflicts at intersections, pedestrian crossings, and other high-use areas. Consequently, safety improvements – such as intersection enhancements, protected non-motorized facilities, and modernized traffic controls – are essential to maintaining a safe and efficient transportation system while accommodating new development.
This demonstrates a direct link between new development and the necessity for transportation infrastructure improvements. To maintain service standards, the fees to be imposed on new development will ensure new development contributes its fair share of funds to mitigate the impacts caused by such development.
Determine how the need for the public facility relates to the type of development project for which the fee is imposed.
Funds collected through TIF will be used to implement transportation projects listed in Table 3. These projects were identified in the General Plan Mobility Element, the City’s Capital Improvement Program , Pedestrian Transportation Action Plan, and Local Road Safety Plan. These projects are essential to Pasadena’s long-term transportation planning goals to support increased demand for new developments.
The TIF program will not be used to address existing transportation deficiencies. The City has funded and is implementing several major intersection and roadway improvement projects to address existing and future traffic that are not funded through the Fee. Therefore, the TIF differentiates this relationship by aligning fees assessed with the projected impacts of each type of future development.
Demonstrate the relationship between the fee and the cost of the public facility.
The Nexus Study uses the Pasadena TDF Model to determine the anticipated growth within the City by 2035. A model select zone run was conducted to isolate traffic volumes on the roadway network associated with anticipated growth within the City. The project team reviewed the incremental growth in traffic volumes that occurs either through or in the vicinity of transportation improvements in the project list. The traffic volume forecast shows a 12.1% growth from existing conditions to future conditions in th e PM peak hour as a result of new development. Therefore, new developments would be responsible for funding the fair share (12.1%) of the City’s planned transportation improvements contained in the project list (Table 3). Section 4.2 demonstrates the calculations of the fee.
City of Pasadena Transportation Impact Fee Update
June 2025
34 5. Fee Implementation and
Administration
5.1 Administration Features and Costs
Transportation impact fees (Table 8) include a five percent (5%) administrative charge to cover overhead costs for City programs (legal, accounting, and administrative support) and fee program expenses such as revenue collection, cost accounting, public reporting, and fee justification analyses.
Since the impact fees developed in this study are based on future facilities costs in 2025 dollars, applying an annual escalator is appropriate to account for inflation. Therefore, beginning on January 1, 2026 and annually thereafter, these fees will be adjusted to reflect changes in the Construction Cost Index (CCI). This ensures that as costs rise, new development continues to contribute to funding improvements at the time of payment. The City of Pasadena DOT will calculate the updated impact fee each year.
Transportation impact fees will be paid by a developer as a one-time fee prior to the issuance of the certificate of occupancy. Additionally, a development project may be conditioned to provide local transportation and streetscape improvements to offset the negative effects on local circulation system due to increased traffic on adjacent roadways. These improvements may include, but are not limited to, signal system upgrades, phasing adjustments, lane reassignment, and enhancements to bicycle or pedestrian facilities that are not part of the transportation project list in this analysis. Developments may be eligible to credit the cost of any specific improvement required as a condition of approval against the required transportation impact fee so long as such improvement would be considered a part of the Transportation Impact Fee Project List contained in Appendix A.
5.2 Program Monitoring
The California Mitigation Fee Act requires all municipalities to complete both an annual public report and a five-year public report summarizing the status of their fee programs.
5.2.1 Annual Report
Government Code Section 66006(b) requires the City to publicly disclose following information, with the Annual Report due within 180 days of the end of each fiscal year:
• A brief description of the type of fee in the account or fund. • The amount of the fee.
• The beginning and ending balance of the account or fund. • The amount of the fees collected and the interest earned.
City of Pasadena Transportation Impact Fee Update
June 2025
35 • An identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded with fees.
• An identification of an approximate date when construction will begin if the City determines that it has sufficient funds to complete financing for an incomplete public improvement; verification of previously reported projects began as scheduled; and the provision of reason for the delay and a revised start date if construction did not commence.
• A description of each interfund transfer or loan made from the account or fund. • The amount of refunds made from the accounts.
5.2.2 Five-Year Report
Pursuant to Government Code Section 66001(d)(1), The submittal of the Five-Year Report to the City Council must occur every five years following the first deposit of impact fees into an account. The City Council is required to make specific legislative findings to continue its collection of the fees if any unexpended funds remain in the account, or must return any fees to the property owners who paid them.
The Council must approve the Five-Year Report, which does the following:
• Identify the purpose of imposing the fee;
• Demonstrate a reasonable relationship between the fee and the purpose for which it is charged; • Identify all sources and amounts of funding anticipated to complete financing any incomplete improvements that were identified when enacting the fee; and • Identify the approximate dates when the anticipated funds are expected to be received.
Appendix A: Impact Fee Program
Transportation Project List
Project
Category Project Name Type1
Estimated
Total Project
Cost
Unfunded
Project
Cost
Source
Document &
Page Number2
Active Transportation / Complete Streets
Pasadena Bicycle Program FY 2026-2030 Bike $500,000 $400,000 CIP (5.1) Citywide Neighborhood Traffic Management
Program FY 2026-2030
Bike/Ped/Roa
dway $1,199,915 $1,199,915 CIP (5.3)
Arterials Speed Management Program FY
2026-2030
Roadway
Capacity $660,500 $660,500 CIP (5.4)
Citywide Complete Streets Program FY 2025-
2029
Bike/Ped/Roa
dway $20,000,000 $20,000,000 CIP (5.5)
Pedestrian Transportation Action Plan -
Outreach and Conceptual Design Ped $2,200,000 $2,000,000 CIP (5.8) - 75511 Citywide Continental Crosswalk
Implementation Ped $18,300,000 $18,225,000 CIP (5.12) - 75917 Compete Streets Project - Mountain St at
Sierra Bonita Ave and Sinaloa Ave - Design
Phase
Ped/Roadway $4,500,000 $4,420,000 CIP (5.13) - 75107
Rose Bowl Pedestrian & Bicycle Access Study Ped/bike $9,436,889 $9,436,889 CIP (5.14) Two-Way Traffic Conversion - Mentor Ave
from Walnut St to Colorado Blvd - Feasibility
Study
Roadway $200,000 $103,000 CIP (5.16) - 75918
Pedestrian Crossing Enhancements Program
FY 2021-2028 Ped $4,250,000 $2,991,771 CIP (5.17) - 75112 El Molino Avenue Quick-Build Greenway
Demonstration Project Bike $1,945,650 $1,945,650 CIP (5.18) Complete Streets Project - Rosemont Ave
Pedestrian Safety Enhancements from Seco St
to Orange Grove Blvd - Design Phase
Ped/Roadway $400,000 $400,000 CIP (5.48)
Arroyo Link Walking and Biking Path Ped/bike $45,000,000 $45,000,000 CIP (5.49) Traffic Operations, Traffic
Signals, ITS
Mobility Corridor Improvements FY 2026-
2030 Roadway $612,144 $612,144 CIP (5.19)
Old Pasadena Traffic Improvement - FY 2026-
2030 Roadway $310,000 $280,000 CIP (5.20)
ITS Equipment Upgrades/Replacement - FY
2021-2028 Ped $950,802 $450,000 CIP (5.21) - 75117
Citywide Leading Pedestrian
Interval/Accessible Pedestrian Signal
(LPI/APS) Implementation Program FY 2025-
2029
Ped $5,500,000 $5,500,000 CIP (5.22)
Project
Category Project Name Type1
Estimated
Total Project
Cost
Unfunded
Project
Cost
Source
Document &
Page Number2
Implementation of Citywide Transportation
Performance Monitoring Network Roadway $3,182,428 $2,520,500 CIP (5.23) - 75602 Installation of Traffic Signal and Curb
Extensions at Sierra Bonita Ave and Orange
Grove
Ped/Roadway $970,000 $132,077 CIP (5.30) - 75134
Installation of Pedestrian Hybrid Beacons
(HAWKs) at Various Locations Ped $2,000,000 $2,000,000 CIP (5.35) Mobility Hubs & First/Last Mile
Improvements Ped $24,000,000 $24,000,000 CIP (5.36)
Signal Preemption Equipment at Traffic
Signals Citywide - Phase II Roadway $280,000 $240,000 CIP (5.38) - 75916 Transportation System Safety Enhancements
Project – FY 2021-2028 Roadway $1,097,710 $400,000 CIP (5.39) - 75115 Transit
Purchase of Zero-Emission Pasadena Transit
Vehicles and Supporting Infrastructure Transit $43,300,000 $43,300,000 CIP (5.40) Purchase of Zero-Emission Pasadena Dial-A-
Ride Vehicles and Supporting Infrastructure Transit $3,542,500 $3,542,500 CIP (5.41) Systemwide Bus Zone Enhancements Transit $3,000,000 $3,000,000 CIP (5.42) Purchase of Replacement Transit Vehicles and
Expansion Fixed-Route Transit Vehicles Transit $42,445,364 $10,628,276 CIP (5.43) - 75085 Purchase of Dial-a-Ride Vehicles Transit $7,884,316 $3,969,278 CIP (5.44) - 75086 Construction of Transit Operations
Maintenance Facility Transit $100,000,000 $31,540,000 CIP (5.45) - 75707 Bus Stop Improvement Program Transit $4,332,093 $2,319,621 CIP (5.46) - 75900 Streets & Streetscape
Intersection Improvements at Colorado Blvd
and Garfield Ave Ped/Roadway $400,000 $400,000 CIP (2.14) Pedestrian Safety Enhancements on Oak Knoll
Ave Ped $300,000 $300,000 CIP (2.15)
Improvement of Green Street - Orange Grove
Blvd to Hill Ave Roadway $4,000,000 $4,000,000 CIP (2.16) Safe Routes to School - Sidewalk Repairs Ped $1,000,000 $1,000,000 CIP (2.17) Civic Center/Mid-Town Public Improvements
& Related Components - Phase II Ped/Roadway $8,500,000 $8,500,000 CIP (2.18) New York Drive Bridges - Preventive
Maintenance Misc $2,181,000 $2,181,000 CIP (2.19)
Arroyo Boulevard Bridge - Seismic Retrofit Misc $5,844,000 $5,844,000 CIP (2.21) Annual Citywide Street Resurfacing and ADA
Improvement Program FY 2026 Ped/Roadway $54,200,000 $20,400,000 CIP (2.1) Curb Ramp ADA Improvements Program FY
2022 - 2026 Ped $5,000,000 $2,201,950 CIP (2.4) - 73937 San Rafael Bridge Seismic Retrofit Misc $10,215,001 $1,121,661 CIP (2.9) - 73946 Street Lighting Program FY 2024-2028 Misc $6,775,000 $5,374,944 CIP (3.4) - 74422
Project
Category Project Name Type1
Estimated
Total Project
Cost
Unfunded
Project
Cost
Source
Document &
Page Number2
Other
Playhouse Village - Colorado Blvd
Enhancements from Madison Ave to Oak
Knoll Ave - Feasibility Study
Ped/Roadway $250,000 $250,000 CIP (5.51)
Playhouse Village - N Lake Ave. from E
Colorado Blvd. to Corson St. - Feasibility
Study
Ped/Roadway $250,000 $250,000 CIP (5.52)
Traffic Signal and Pedestrian Improvements
on Kinneloa Ave at Del Mar Blvd Ped/Roadway $1,500,000 $1,500,000 CIP (5.53) Traffic Signal at Electronic Dr and Sierra
Madre Villa Blvd Roadway $950,000 $950,000 CIP (5.54)
Mountain Street Curb Extension Ped $297,000 $297,000 CIP (5.55) Complete Streets Project - Sunnyslope Ave at
Estado St - Construction Phase Ped/Roadway $425,000 $425,000 CIP (5.56) Local Roadway Safety Plan (LRSP)
Retro-reflective backing plates Roadway $689,910 $689,910 LRSP (77) Nearside Signals Ped $105,628 $105,628 LRSP (77)
Rectangular Rapid Flashing Beacons (RRFB) Ped $499,590 $499,590 LRSP (77) Regulatory Signs Roadway $163,913 $163,913 LRSP (77)
Lake Ave & Maple St High Visibility
Crosswalks Ped $14,274 $14,274 LRSP (78)
El Molino Av & Villa St High Visibility
Crosswalks Ped $19,032 $19,032 LRSP (78)
Optional Restriping Roadway $3,218,430 $3,218,430 LRSP (79) Fair Oaks Ave & Maple Street Safety
Improvements Roadway $109,612 $109,612 LRSP (77)
Washington Boulevard Safety Improvements
btwn Forest Ave and Catalina Ave Roadway $190,891 $190,891 LRSP (77) Del Mar Boulevard Safety Improvements btwn
Los Robles Ave and east City Limits Roadway $310,621 $310,621 LRSP (77) Lake Ave & Washington Bl Optional Safety
Enhancements Roadway $59,951 $59,951 LRSP (78)
Fair Oaks Ave & Washington Bl Optional
Safety Enhancements Roadway $59,951 $59,951 LRSP (78)
Fair Oaks Ave & Orange Grove Bl Optional
Safety Enhancements Roadway $516,719 $516,719 LRSP (78) Colorado Bl & Sierra Madre Bl Optional
Safety Enhancements Roadway $59,951 $59,951 LRSP (78)
Arroyo Pkwy & Green St Optional Safety
Enhancements Roadway $613,782 $613,782 LRSP (78)
Lake Ave btwn Mountain and California
Optional Safety Enhancements Roadway $55,288 $55,288 LRSP (79)
Project
Category Project Name Type1
Estimated
Total Project
Cost
Unfunded
Project
Cost
Source
Document &
Page Number2
Los Robles Ave btwn Washington and Maple
Optional Safety Enhancements Roadway $47,580 $47,580 LRSP (79) Pedestrian Transportation Action Plan (PTAP)
Allen Avenue Pedestrian Improvement Project
from north City limit to Colorado Blvd. Ped $6,951,691 $6,951,691 PTAP (Appendix F)
Del Mar Boulevard Pedestrian Improvement
Project from Pasadena Avenue to east City
limit
Ped $4,817,903 $4,817,903 PTAP
(Appendix F)
Fair Oaks Avenue Pedestrian Improvement
Project from north City limit to south City
limit
Ped $6,363,397 $6,363,397 PTAP
(Appendix F)
Foothill Boulevard Pedestrian Improvement
Project from Walnut Street to east City limit Ped $1,614,389 $1,614,389 PTAP (Appendix F)
Lake Avenue Pedestrian Improvement Project
from north City limit to Colorado Boulevard Ped $3,563,718 $3,563,718 PTAP (Appendix F)
Lincoln Avenue Pedestrian Improvement
Project from north City limit to Washington
Boulevard
Ped $1,647,458 $1,647,458 PTAP
(Appendix F)
Los Robles Avenue Pedestrian Improvement
Project from north City limit to Walnut Street Ped $4,113,529 $4,113,529 PTAP (Appendix F)
Raymond Avenue Pedestrian Improvement
Project from Colorado Boulevard to E
Glenarm Street
Ped $3,329,173 $3,329,173 PTAP
(Appendix F)
San Gabriel Boulevard Pedestrian
Improvement Project from Maple Street to
California Boulevard
Ped $2,103,690 $2,103,690 PTAP
(Appendix F)
Washington Boulevard Pedestrian
Improvement Project from Lincoln Avenue to
Lake Avenue
Ped $6,716,088 $6,716,088 PTAP
(Appendix F)
Note:
1. Ped = Pedestrian, Misc = Miscellaneous
2. CIP = Capital Improvement Program (FY 2026), LRSP = Local Road Safety Plan (2022), and PTAP = Pedestrian Transportation Action Plan (2024)
Appendix B: AB-602 Calculations for
Residential Units by Size
Table: Average Trip Generation by Dwelling Unit Size for Single Family and Multi Family Units to Comply with AB 602
1. Single Family
Number of
Units**
Percent of
Units Trips Number of
Units**
Percent of
Units Trips Number of
Units**
Percent of
Units Trips Number of
Units**
Percent of
Units Trips
1 person 3.82 2,606 27% 1.02 223 10% 0.38 47 8% 0.32 40 14% 0.55 2 persons 6.88 2,963 30% 2.08 785 35% 2.39 192 34% 2.33 65 23% 1.60 3 persons 9.44 1,548 16% 1.49 396 18% 1.65 103 18% 1.72 36 13% 1.22 4 persons 12.61 1,512 15% 1.95 460 20% 2.57 111 20% 2.47 57 20% 2.58 5 persons 14.72 710 7% 1.07 222 10% 1.45 59 10% 1.53 40 14% 2.11 6 persons 15.28 237 2% 0.37 101 4% 0.68 27 5% 0.73 20 7% 1.10 7 persons or more 21.08 217 2% 0.47 75 3% 0.70 27 5% 1.01 21 8% 1.59 Total 9,794 100% 8.44 2,261 100% 9.80 566 100% 10.11 279 100% 10.74 *Source: 2017 National Household Travel Survey California Add-On. **Source: 2021 California American Housing Survey.
2. Multi-Family
Number of
Units**
Percent of
Units Trips Number of
Units**
Percent of
Units Trips Number of
Units**
Percent of
Units Trips
1 person 3.82 955 45% 1.73 1,295 23% 0.88 579 13% 0.51
2 persons 6.88 560 27% 1.82 1,715 31% 2.11 1,472 34% 2.33 3 persons 9.44 253 12% 1.13 947 17% 1.60 743 17% 1.62
4 persons 12.61 234 11% 1.40 881 16% 1.98 857 20% 2.49
5 persons 14.72 72 3% 0.51 474 8% 1.25 386 9% 1.31
6 persons 15.28 19 1% 0.14 163 3% 0.45 155 4% 0.55
7 persons or more 21.08 17 1% 0.17 125 2% 0.47 149 3% 0.72 Total 2,111 100% 6.90 5,601 100% 8.73 4,342 100% 9.53
*Source: 2017 National Household Travel Survey California Add-On. **Source: 2021 California American Housing Survey.
3.50 79% 100% 109%
Persons per Household Trips per
Household*
Less than or equal to 800 sq.ft 801 to 1,600 sq.ft Greater than 1,600 sq.ft Average Persons Per Household 2.07 2.74 3.02
Greater than 4,000 sq.ft
Equivalent Dwelling Unit
Persons per Household Trips per
Household*
Less than 2,000 sq.ft 2,000 to 3,000 sq.ft 3,000 sq.ft to 4,000 sq.ft Equivalent Dwelling Unit 86% 100% 103% 110%
Average Persons Per Household 2.63 3.13 3.24
Appendix C: Pasadena Travel Demand
Forecasting Model Development Report
Pasadena Travel Demand Forecasting
Model Development Report
Prepared for:
City of Pasadena
Ref. LA17-2944
December 2018
Table of Contents
Introduction .................................................................................................................. ............................. 1 General Discussion of the TDF Model ................................................................................................................. 1 What Is a TDF Model? ................................................................................................................................... 1 How Is a TDF Model Useful? ......................................................................................................................... 1 How Do We Know if the TDF Model is Accurate? ........................................................................................ 1 Is the City of Pasadena TDF Model Consistent with Standard Practices? ................................................. 2 How Can the TDF Model Be Used? ............................................................................................................... 2 Study Area and Street Network ........................................................................................................................... 2 Summary of the Input Data ..................................................................................................... .................. 4 Data Collection ............................................................................................................... ...................................... 4 Land Use Data ...................................................................................................................................................... 4 Traffic Analysis Zone System ............................................................................................................................... 8 Street Network .................................................................................................................................................... 11 HOV Lanes ..................................................................................................................... .............................. 13 Description of the Model Calibration Process .................................................................................. ..... 15 Trip Generation Rates ........................................................................................................................................ 15 Production and Attraction Balancing ................................................................................................................. 17 Further Refinement ............................................................................................................................................ 18 Area Types .................................................................................................................... ............................... 18 Trip Distribution (Gravity Model) ........................................................................................................................ 23 Friction Factors ............................................................................................................................................ 23 K Factors ...................................................................................................................................................... 25 Trips between the Model Area and External Areas ................................................................................... 25 Through Trips ............................................................................................................................................... 26 Trip Assignment ............................................................................................................... ....................... 28 Turn Penalties .............................................................................................................................................. 28 Model Validation .................................................................................................................................... 29 Static Validation .................................................................................................................................................. 29 Comparison Techniques ............................................................................................................................. 30 Validation Guidelines .................................................................................................................................. 32 Dynamic Validation ............................................................................................................................................. 33 Vehicle Miles Traveled (VMT) .................................................................................................. ............... 38 2012 California Household Travel Survey (CHTS) ............................................................................................ 38 Streetlight Data ................................................................................................................................................... 39 Mode Shift Analysis Tool ...................................................................................................... .................. 42 MSAT Approach ................................................................................................................. ................................. 42 Strategies Analyzed ............................................................................................................................................ 43 Sensitivity Testing and Updates to 2017 Model ............................................................................................... 45 Running the Model ............................................................................................................. .................... 48 Model Post Processing ....................................................................................................................................... 48 APPENDIX A: Traffic Analysis Zones Key Map ................................................................................... ... 51
List of Figures
Figure 1 –Pasadena Study Area and Street Network ................................................................................................ 3 Figure 2 – Pasadena External Station Locations ..................................................................................................... 10 Figure 3 – Model Area Types .................................................................................................................................... 22 Figure 4 – Friction Factors ........................................................................................................................................ 24 Figure 5 – Increase Speed on Colorado between Marengo and El Molino, from 35 mph to 45 mph .................. 34 Figure 6 – Add Capacity on Wilson between Walnut and Green, from 600 to 900 .............................................. 35 Figure 7 – Add Lanes on Mountain between Wheeler and Lake, from 1 to 2 lanes in each direction ................ 36 Figure 8 – Remove Lanes on Lake between Villa and Mountain, from 2 to 1 ....................................................... 37 Figure 9 – Trip Length Comparison ......................................................................................................................... 39 Figure 10 – Scatter Plot Comparing Streetlight and Pasadena Model Trip Distribution ..................................... 40 Figure 11 – Streetlight Zones .................................................................................................................................... 41 Figure 12 – Mode Shift Analysis Tool Structural Procedure ................................................................................... 45 Figure 13 – Proximity Analysis: Bike ......................................................................................................................... 49 Figure 14 – Proximity Analysis: Transit .................................................................................................................... 50
List of Tables
Table 1 – Base Year Model Land Use Categories ..................................................................................................... 6 Table 2 – Future Model Land Use Categories .......................................................................................................... 7 Table 3 – External Stations ......................................................................................................................................... 9 Table 4 – Network Changes ...................................................................................................................................... 12 Table 5 - Typical Roadway Speeds and Capacities ................................................................................................ 14 Table 6 – Trip Purpose Percentages ........................................................................................................................ 18 Table 7 - Vehicle Per Person in Pasadena ............................................................................................................... 19 Table 8 - Daily Vehicle Trip Generation Rate Comparison ....................................................................................... 20 Table 9 – Average K Factor by Area Type ............................................................................................................... 25 Table 10 - Pasadena Commuting Patterns .............................................................................................................. 26 Table 11 - Matrix of Daily Through (EE) Trips .......................................................................................................... 27 Table 12 - Results of Daily Model Validation .......................................................................................................... 30 Table 13 - Results of Peak Period Model Validation ............................................................................................... 31 Table 14 - Results of Peak Hour Model Validation ................................................................................................. 31 Table 15 – Vehicle Miles Traveled (VMT) Comparison ........................................................................................... 38 Table 16 – Trip Length Comparison ......................................................................................................................... 39 Table 17 - Mode Shift Analysis Tool Strategies Tool Kit ......................................................................................... 46 Table 18 - Metro Gold Line Daily Ridership ............................................................................................................ 47 Table 19 - Mode Shift Analysis Tool Coefficients Recalibration ............................................................................ 47
Pasadena Model Development Report
December 2018
1 Introduction
The purpose of this report is to introduce and describe updates to the Travel Deman d Forecasting (TDF) model built for the City of Pasadena. This report describes the model development process in general, and how this process was applied to develop the City of Pasadena model, including the sources of data used to develop key model inputs. This process was originally completed in 2011, then updated in 2013, and again in 2017. Most comparisons in the report compared the 2017 version of the model with the 2013 version.
General Discussion of the TDF Model
This section summarizes the answers to commonly asked questions related to TDF models and how the City can use a TDF model.
What Is a TDF Model?
A TDF model is a computer program that simulates traffic levels and travel patterns for a specific geographic area. The program consists of in put files that summarize the ar ea’s land uses, street network, travel characteristics, and other key f actors. Using this data, the mo del performs a series of calculations to determine the amount of trips generated, the beginning and endi ng location of each trip, and the route taken by the trip. The model’s output includes projections of traffic volumes on major roads, and peak hour turning movements at certain key intersections.
How Is a TDF Model Useful?
The City TDF model is a valuable tool for preparing long-range transportation planning studies, such as Pasadena’s General Plan and Mobility Element Update. The travel m o d e l c a n b e u s e d t o e s t i m a t e t h e average daily and peak hour traffic volumes and Vehicle Miles T raveled (VMT) on the major roads in response to future land use, transportation infrastructure, and policy assumptions. It can also be used to form a consistent basis by which to analyze the different poten tial land use scenarios. Additionally, using these traffic projections, transportation improvements will be identified to accommodate the changing traffic patterns associated with the General Plan’s preferred land use alternative.
How Do We Know if the TDF Model is Accurate?
To be deemed accurate for projecting traffic volumes in the future, a model must first be calibrated to a year in which actual land use data and traffic volumes are avai lable and well documented. A model is accurately calibrated when it replicates the actual traffic counts on the major roads within certain ranges of
Pasadena Model Development Report
December 2018
2 error established in 2010 California Regional Transportation Plan Guidelines (California Transportation Commission, 2010) and it demonstrates stable responses to varying levels of inpu ts. The Pasadena model has been calibrated to 2017 base year conditions using actual traffic counts, census data, Streetlight travel pattern data, and land use data compiled by City staff.
Is the City of Pasadena TDF Model Consistent with
Standard Practices?
The City of Pasadena model is consistent in form and function with standard travel forecasting models used in transportation planning. The model includes a land use/trip g e n e r a t i o n m o d u l e , a g r a v i t y - b a s e d t r i p distribution model, and a capacity-restrained equilibrium traff ic assignment process. The travel model utilizes Version 7.0 (Build 12410) o f the TransCAD Transportati on GIS software, which is consistent with m a n y o f t h e m o d e l s u s e d b y l o c a l j u r i s d i c t i o n s i n C a l i f o r n i a a nd throughout the nation. The Southern California Association of Governments (SCAG), the metropolitan planning organization (MPO) for Southern California, maintains their current regional travel demand model in TransCAD.
How Can the TDF Model Be Used?
The TDF model can be used for many purposes related to the plan ning and design of the City’s transportation system. The following is a partial listing of the potential uses of the TDF model:
• To update the land use and circulation elements of the General Plan • To conduct a city-wide traffic impact fee program
• To evaluate the traffic impacts of area-wide land use plan alternatives • To evaluate the shift in traffic resulting from a roadway improvement • To evaluate the traffic impacts of land development proposals • To determine trip distribution patterns of larger land development proposals • To support the development of transportation sections of Environmental Impact Reports (EIRs) • To support the preparation of project development reports for Caltrans • To calculate Vehicle Miles Traveled (VMT) and Vehicle Trips (VT) per capita per the City’s transportation impact guidelines
Study Area and Street Network
Figure 1 shows the study area for the City travel demand forecasting model. The model area encompasses the City of Pasadena, and neighboring areas that have high leve ls of interaction with Pasadena. The study area contains all areas that may experience land use changes un der the Pasadena General Plan Land Use Update.