ATTACHMENT D
ADDENDUM TO THE GENERAL PLAN ENVIRONMENTAL IMPACT REPORT
Our Pasadena – Putting the Plan in Motion
North Lake Specific Plan Update
Addendum to the
Pasadena General Plan
Environmental Impact Report
DRAFT FOR REVIEW
Prepared for:
The City of Pasadena
Planning & Community Development Department
175 N. Garfield Avenue
Pasadena, CA 91101
Prepared by:
300 S. Grand Avenue, 9th Floor
Los Angeles, California 90071
September 2025
Page Intentionally Left Blank.
Table of Contents North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025 Page i
Table of Contents
CHAPTER 1 PURPOSE AND BACKGROUND ................................ ................................ ..... 1
1.1 Applicability and Use of an Addendum ............................................ 2
1.2 Format of This Addendum ................................................................... 3
1.3 Summary of Findings ............................................................................ 3
1.4 Lead Agency and Discretionary Approvals ....................................... 3 CHAPTER 2 PROJECT DESCRIPTION ................................ ................................ ............... 1
2.1 Introduction ............................................................................................ 1
2.2 Project Location ...................................................................................... 1
2.3 Project Objectives ................................................................................... 4
2.4 Description of the Proposed Project .................................................... 5
2.4.1 Relationship to 2015 General Plan ....................................................... 6
2.4.2 Relationship to 1997 North Lake Specific Plan ................................ 10
2.4.3 Proposed NLSP Updates .................................................................... 10 CHAPTER 3 EVALUATION OF ENVIRONMENTAL IMPACTS ................................ ............. 1 I. AESTHETICS. ....................................................................................... 3 II. AGRICULTURAL RESOURCES. ......................................................... 7 III. AIR QUALITY. ..................................................................................... 11 IV. BIOLOGICAL RESOURCES ............................................................... 18 V. CULTURAL RESOURCES .................................................................. 25 VI. ENERGY ................................................................................................ 31 VII. GEOLOGY AND SOILS ...................................................................... 35 VIII. GREENHOUSE GAS EMISSIONS .................................................... 44 IX. HAZARDS AND HAZARDOUS MATERIALS .............................. 48 X. HYDROLOGY AND WATER QUALITY ......................................... 55 XI. LAND USE AND PLANNING .......................................................... 64 XII. MINERAL RESOURCES ..................................................................... 71 XIII. NOISE .................................................................................................... 73 XIV. POPULATION AND HOUSING ....................................................... 79 XV. PUBLIC SERVICES .............................................................................. 82 XVI. RECREATION ...................................................................................... 85 XVII. TRANSPORTATION/TRAFFIC ....................................................... 89 XVIII. UTILITIES AND SERVICE SYSTEMS ............................................... 97 Environmental Determination ........................................................................ 105 CHAPTER 4 MITIGATION MEASURES ................................ ................................ ................ 1 CHAPTER 5 LIST OF PREPARERS ................................ ................................ ..................... 1
Table of Contents North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025 Page ii
List of Figures
Figure 1 – Regional Location Map ................................ ................................ ......................2-2 Figure 2 – Pasadena’s Specific Plan Update Areas ................................ ...........................2-3 Figure 3 – Proposed NLSP Boundary and General Plan Land Use Designations ...............2-8 Figure 4 – Proposed NLSP Subareas ................................ ................................ .............. 2-10 Figure 5 – Proposed NLSP Zoning Districts ................................ ................................ ..... 2-11 Table of Contents North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025 Page iii
Acronyms and Abbreviations
AB Assembly Bill
BMP Best Management Practice
CAAQS California Ambient Air Quality Standards
CARB California Air Resources Board
CEQA California Environmental Quality Act
CERCLA Comprehensive Environmental Response, Compensation and Liability Act CG General Commercial
Checklist Environmental Checklist Form
City City of Pasadena
CL Limited Commercial
CMP Congestion Management Program
du/ac dwelling units per acre
EIR Environmental Impact Report
FAR floor area ratio
FTA Federal Transit Administration
GHG greenhouse gas
GP EIR 2015 Pasadena General Plan Environmental Impact Report HRA health risk assessment
I-210 Interstate 210
IS Initial Study
LEED Leadership in Energy and Environmental Design
LOS level of service
LTS Less than Significant Impact
LTS-M Less than Significant Impact with Mitigation
MBTA Migratory Bird Treaty Act
MERV Maximum efficiency rating value
MMRP Mitigation Monitoring and Reporting Program
MU Mixed Use
NAAQS National Ambient Air Quality Standards
NI No Impact
NLSP North Lake Specific Plan
O3 ozone
OEHHA Office of Environmental Health Hazard Assessment
OSHA Occupational Safety and Health Administration
PFD Pasadena Fire Department
PM2.5 fine particulate matter 2.5 microns or less in diameter PM10 respirable particulate matter ten microns or less in diameter PPD Pasadena Police Department
PPL Pasadena Public Library
PUSD Pasadena Unified School District
PWP Pasadena Department of Water and Power
RCRA Resource Conservation and Recovery Act
RM Multifamily Residential
RTP/SCS Regional Transportation Plan/Sustainable Communities Strategy SB Senate Bill
SCAB South Coast Air Basin
SCAG Southern California Association of Governments
Table of Contents North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025 Page iv
SCAQMD South Coast Air Quality Management District
SOC Statement of Overriding Considerations
S-U Significant and Unavoidable Impact
T-BACTs best available control technologies for toxics
TACs toxic air contaminants
TDF Travel Demand Forecasting
VMT vehicle miles traveled
VOC volatile organic compound
VT vehicles traveled
Chapter 1: Purpose and Background North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
CHAPTER 1
PURPOSE AND BACKGROUND
The City of Pasadena (City) has prepared this Addendum to the 2015 Pasadena General Plan Environmental Impact Report (GP EIR) (State Clearinghouse No. 2013091009) to address the potential site-specific environmental impacts associated with the update to the North Lake Specific Plan (proposed project or project). This Addendum is prepared in accordance with the California Environmental Quality Act of 1970 (CEQA) (Cal. Public Resources Code Section 21000, et. seq., as amended) and its implementing guidelines (Cal. Code Regs., Title 14, Section 15000 et. seq., 2016). This Addendum has been prepared and will be processed consistent with CEQA Guidelines (Cal. Code Regs., Title 14, Section 15162 and Section 15164).
In 2015, the City updated the Pasadena General Plan and prepared t he GP EIR to analyze potential citywide impacts, broad policy alternatives, and programmatic mitigation measures associated with the update of the Pasadena General Plan and specific plan amendments , which updated development caps within each specific plan area. The changes focused on the Land Use and Mobility Elements and the Land Use Diagram. The update also included the consolidation of optional elements into required elements of the General Plan. The Land Use and Mobility Elements, together with the other General Plan elements, guide the overall physical development of the City through horizon year 2035. The GP EIR is a Program EIR as defined by CEQA Guidelines Section 15161, California Cod e of Regulations, Title 14, Division 6, Chapter 3 and prepared in compliance with CEQA Guidelines Section 15168. The Final GP EIR was certified and the findings, Statement of Overriding Considerations (SOC), and Mitigation Monitoring and Reporting Program (MMRP) adopted by the City Council on August 17, 2015 (Resolution No. 9451).
Following the adoption of the General Plan Update and certification of the GP EIR, future discretionary actions include specific plan updates and amendments and zone changes to provide consistency with the General Plan. Therefore, the City is updating seve n existing specific plans and creating one new specific plan to align with and implement the updated General Plan. The specific plan updates focus on establishing neighborhood-specific design and land -use goals resulting in new development standards and gu idelines that will help shape the City’s major commercial and mixed -use areas. The North Lake Specific Plan (NLSP) is one of the seven existing specific plans to be updated as part of the General Plan Implementation Program.
Per the GP EIR, future discretionary review may rely on analysis provided in the GP EIR for the purpose of tiering and/or streamlining. The purpose of tiering is to use the analysis of general matters contained in a broader EIR (such as the GP EIR) with later CEQA documents on narrower or more site specific projects (CEQA Guidelines Section 15152). Tiering serves to reduce repetitive analysis and provide subsequent site specific analysis at a time when it is meaningful. Tiering is common and appropriate whe n the sequence of analysis is from a General Plan EIR to a program of lesser scope, such as a specific plan (CEQA Guidelines Section 15152[b]). Therefore, CEQA review required for the City’s eight specific plan areas may tier from the GP EIR pursuant to CEQA Guidelines Section 15152.
Chapter 1: Purpose and Background North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
1.1 Applicability and Use of an Addendum
Per the GP EIR, CEQA review required for the City’s specific plan areas may tier from the GP EIR pursuant to CEQA Guidelines Section 15152. In addition, per CEQA Guidelines Section 15152(h), other methods to streamline the environmental review process also exist. These methods include the use of a Program EIR (i.e., GP EIR) for later activities (CEQA Guidelines Section 15168) and preparing an addendum (CEQA Guidelines Section 15164). Lead agencies have discretion regarding which method may apply and should be used.
Under the process described in CEQA Guidelines Section 15168(c), later activities in the program must be examined in the light of the Program EIR to determine whether an additional environmental document must be prepared. No additional documentation is req uired for subsequent proposed actions (e.g., updating of the City’s specific plans to implement the General Plan) if the examination determines that the potential impacts were within the scope of the GP EIR, and subsequent proposed actions implement approp riate feasible mitigation measures identified in the MMRP that accompanies the Final EIR. Whether a later activity is within the scope of a Program EIR is a factual question that the lead agency determines based on substantial evidence in the record. Factors that a lead agency may consider in making that determination include, but are not limited to, consistency of the later activity with the type of allowable land use, overall planned density and building intensity, geographic area analyzed for environmental impacts and covered infrastructure as described in the Program EIR. If the agency finds that pursuant to CEQA Guidelines Section 15162, no subsequent EIR would be required, the agency can approve the activity as being within the scope of the project covered by the program EIR, and no new environmental document would be required.
The conditions in CEQA Guidelines Section 15162 calling for the preparation of a subsequent EIR are:
1. Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
3. New information of substantial importance which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
a. The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
b. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant Chapter 1: Purpose and Background North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
effects of the project, but the project proponents decline to adopt the mitigation measures or alternative; or
d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
Pursuant to CEQA Guidelines Section 15164, the City, as the lead agency, has prepared this Addendum to confirm that none of the conditions identified in CEQA Guidelines Section 15162 and Public Resources Code Section 21166(c) have been triggered. For a proposed modified project or implementing activity, CEQA Guidelines Section 15164 provides that an Addendum to a previously certified Final EIR may be prepared if only minor technical changes or additions are necessary, or none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred. The City must consider the whole of the data presented in the GP EIR with the information provided in this Addendum and the previously adopted MMRP.
1.2 Format of This Addendum
The previously certified GP EIR serves as the primary environmental compliance document for the project, and this Addendum provides minor changes and additions to the GP EIR. This Addendum should be considered with the full text of the previously certified 2015 GP EIR. All applicable mitigation measures from the GP EIR would be applicable to the proposed project and, therefore, are incorporated by reference into this Addendum. This Addendum relies on the use of an Environmental Checklist Form (Checklist), as suggested in Section 15063(d)(3) of the CEQA Guidelines. Per the CEQA Guidelines, an addendum does not need to be circulated for public review but can be included in or attached to the Final EIR prior to making a decision on the project.
1.3 Summary of Findings
Based upon the Checklist prepared for the proposed project and supporting responses (see Chapter 3), adoption of the update to the NLSP would not result in substantial changes requiring major revisions to the previously certified GP EIR. Further, the proposed project would not result in any new significant environmental impacts that were not discussed in the GP EIR or a substantial increase in the severity of previously identified significant impacts. No new mitigation measures are required for the proposed project. Since only minor changes and additions are required to the GP EIR, and none of the conditions described in Public Resources Code Section 21166 or CEQA Guidelines Section 15162(a -b) or Section 15163 requiring preparation of a subsequent or supplemental EIR have occurred, the City finds that the preparation of an addendum to the GP EIR is the appropriate CEQA documentation for the proposed project and that the proposed project is within the scope of the GP EIR.
1.4 Lead Agency and Discretionary Approvals
This Addendum and the previously certified GP EIR are intended to serve as the environmental documentation for the changes being proposed under the NLSP Update. The City of Pasadena is the lead agency under CEQA and maintains authority to approve the Chapter 1: Purpose and Background North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Addendum for the adoption of the NLSP Update. Discretionary approvals being sought as part of the NLSP Update include the following:
• Acknowledgement of this Addendum to the GP EIR and that no subsequent CEQA document is required;
• General Plan Land Use Map amendment to update the land use categories depicted on the Land Use Diagram as proposed in the NLSP Update. This amendment would also update the Land Use Diagram to reflect the recommended NLSP boundary; • General Plan text amendment to align the plan boundary indicated on the General Plan Land Use Element with the boundary proposed for the NLSP area. Under this amendment, a few areas would be removed from the current plan, while additional parcels would be incorporated into the area;
• Specific Plan Amendment for the NLSP Update;
• Zoning Map amendment to replace zoning district designations indicated on the Zoning Map with the proposed NLSP zoning districts and subareas, and zoning assignment of parcels that are proposed additions to the plan area; • Zoning Code text amendment to replace existing permitted uses and standards in the Zoning Code with the uses and standards proposed in the NLSP to implement the plan;
• Zoning Code Amendment to incorporate a new NLSP ordinance to regulate zoning consistent with the General Plan, replacing the existing Pasadena Municipal Code Chapter 17.31; and
• Any other minor technical updates necessary for the General Plan Implementation Program/Specific Plan Updates project.
Chapter 1: Purpose and Background North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
CHAPTER 2
PROJECT DESCRIPTION
2.1 Introduction
On August 18, 2015, the City certified the Pasadena General Plan (GP) Final Environmental Impact Report (GP EIR). The GP EIR analyzed potential citywide impacts, broad policy alternatives, and programmatic mitigation measures. The GP EIR analyzed the update of the GP and specific plan amendments, which were limited to specific plan boundary changes and updated development caps within each of the City’s eight specific plan areas. The changes focused on the Land Use and Mobility Elements and the Land Use Diagram. The update also included the consolidation of optional elements into required elements of the General Plan.
The Land Use and Mobility Elements, together with the other General Plan elements, guide the overall physical development of the City through horizon year 2035.
The City is updating seven existing specific plans and creating one new specific plan to align with the updated 2015 General Plan. The specific plan updates focus on establishing neighborhood-specific design and land-use goals resulting in new development standards and guidelines that will help shape the City’s major commercial and mixed-use areas. The NLSP is one of the seven existing specific plan s to be updated as part of the General Plan Implementation Program.
The purpose of this Addendum to the GP EIR is to evaluate the environmental effects associated with the proposed NLSP Update and to determine whether these impacts are consistent with the evaluation presented in the GP EIR in compliance with CEQA (Public Resources Code Sections 21000 et seq.) and the State CEQA Guidelines (California Code of Regulations Section 15000 et seq.).
2.2 Project Location
The proposed NLSP area is generally bounded by Maple Avenue and the I-210 Freeway to the south; Elizabeth Street to the north; Catalina Avenue, Mentor Avenue, and Wilson Avenue to the east ; and El Molino Avenue and Hudson Avenue to the west. The existing NLSP boundary extends along a 1.38-mile segment of North Lake Avenue between the I -210 Freeway to the south and Elizabeth Street to the north. The Metro A Line Lake Station is located just outside the existing NLSP boundary to the south.
Figure 1 shows the general location of the existing NLSP area within the region . Figure 2 shows the NLSP Update area among the general locations of the City’s eight Specific Plans that make up the General Plan Implementation Program.
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Figure 1 - Regional Location Map
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
*Specific Plan Boundaries are Subject to Change Figure 2 - Pasadena’s Specific Plan Update Areas
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
2.3 Project Objectives
The primary goals and objectives identified in the 2015 GP EIR include:
• Objective 1: Provide a new Land Use Element that targets growth to serve community needs and enhance the quality of life. Direct higher density development away from residential neighborhoods and into the Central District, Transit Villages, and Neighborhood Villages.
• Objective 2: Reduce vehicle miles traveled for the City and the region by providing a diverse housing stock, job opportunities, and exciting districts with commercial and recreational uses, and transit opportunities in the Central District, Transit Villages, and Neighborhood Villages.
• Objective 3 : Ensure new development builds upon Pasadena’s tradition of strong sense of place, great neighborhoods, gardens, plazas, parks, and trees. • Objective 4 : Preserve Pasadena’s historic resources by ensuring that new development is compatible with and differentiated from existing historic resources. • Objective 5 : Achieve economic vitality and fiscal responsibility by providing jobs, services, revenues, and opportunities with a diverse economic base. • Objective 6: Provide a General Plan that establishes the goals and policies to create a socially, economically, and environmentally sustainable community. Provide safe, well-designed, accessible, and human-scale residential and commercial areas where people of all ages can live, work, and play, including neighborhood parks, urban open spaces, and the equitable distribution of public and private recreational facilities. • Objective 7: Create a cultural, scientific, corporate, entertainment, and educational center for the region. Provide long -term growth opportunities for existing institutions and foster a healthy economy to attract new cultural, scientific, corporate, entertainment, and educational institutions.
• Objective 8: Create mobility guidelines and multimodal metrics consistent with Senate Bill (SB) 743. Incorporate new goals, policies, and programs that balance multiple modes of transportation and meet the requirements of the Complete Streets Act. • Objective 9 : Reduce greenhouse gas emissions and encourage walking, biking, transit, and other alternatives to motor vehicles by creating strategies to encourage nonautomotive travel and protect residential neighborhoods consistent with Assembly Bill (AB) 32, SB 375, and SB 743.
• Objective 10 : Reconcile General Plan buildout projections with regional and subregional estimates for growth creating consistency with the Southern California Association of Governments (SCAG).
• Objective 11: Incorporate housing sites identified in the adopted Housing Element Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
with the Land Use Element.
In accordance with the GP EIR goals and objectives, the proposed NLSP Update includes the following vision statement:
Vision Statement: The vision of North Lake Avenue is a vibrant and visually cohesive corridor, weaving together several distinct pedestrian-oriented districts that complement and build upon the cultural and architectural history of the community and its surrounding neighborhoods.
Vision Objectives:
• Sustainable Growth: A lively mix of new residential and neighborhood -serving retail shops, restaurants and services, close to transit and open space. • A Sense of Place. Places with a unique identity and character that people want to visit, built around engaging gathering spaces and inviting streetscapes. • High-Quality Homes. Well-designed multi -family housing that creates varied and affordable options to fit all kinds of Pasadena residents and families. • Economic Vitality. Small businesses and local institutions that contribute to the area’s economy, providing jobs as well as other benefits to the area. • Walkable Neighborhood. Sidewalks designed for pedestrian comfort, safety, and mobility, with easy connections to people’s daily needs and multimodal transport. • Green Community. Attractive streets lined with consistent, healthy tree canopies and landscaping that will support climate resiliency and improve public health.
2.4 Description of the Proposed Project
The proposed project would update the NLSP to implement the General Plan. As part of the proposed project, a General Plan Land Use Diagram amendment would be adopted so that the Land Use Diagram is consistent with the boundaries and land use categories proposed in the NLSP Update. The purpose of this Addendum to the GP EIR is to evaluate the environmental effects associated with the proposed NLSP Update as compared to the evaluation presented in the GP EIR.
This project proposes to update the following components of the NLSP to bring it into alignment with the General Plan:
• Specific Plan Area boundary
• Vision, objectives, goals and policies
• Zoning districts regulating allowed land uses
• Density and intensity of development
• Height and/or overall scale of buildings and structures • Distance of buildings and structures to the property line (setbacks/stepbacks) • Urban design standards
• Vehicle access and parking standards
• Types and amount of open space and landscaping requirements Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
• Public realm standards (sidewalks, parkways and street trees) • Implementation programs
Updates to the NLSP primarily focus on refining and/or establishing land uses and zoning districts, as well as objective development standards to achieve the goals and vision of the General Plan. This includes building upon the NLSP area’s existing strengt h as a neighborhood corridor with a mix of uses, walkable areas with shopping, restaurants, offices, and housing. Updates to the NLSP seek to stimulate housing and commercial development, encourage pedestrian-oriented retail and services, support pedestria n mobility, and target housing opportunities in a contextually sensitive manner. Through incremental development, the NLSP would strengthen North Lake’s role as a local “main street”, providing a wider variety of amenities, services, and housing options to residents, employees, and visitors. To support the land use and zoning district updates, the NLSP Update includes urban design standards related to scale, frontages, open space, and parking to encourage quality architecture that enhances the community’s unique character. Standards for the public realm are also included in the NLSP Update to address and regulate pedestrian infrastructure and amenities to support a safe, accessible, and comfortable pedestrian experience, including sidewalks, parkways, and street trees. The NLSP Update does not address public roadway modifications or improvements, which are within the purview of other City documents.
2.4.1 Relationship to 2015 General Plan
The 2015 General Plan represented an update to the City General Plan Elements, including the Mobility Element and the Land Use Element, which guide the overall physical development of the City. The 2015 General Plan also established new development caps fo r each of the Specific Plan areas, including the NLSP. However, the General Plan leaves the more detailed development and design standards to be identified in the Specific Plan. The proposed NLSP Update establishes the regulatory tools needed to implement the General Plan through the identification of development and design standards suited to the NLSP area. As this document compares the environmental impacts of the proposed NLSP Update to those analyzed in the GP EIR, it is important to note the following:
• The proposed NLSP Update does not modify or change the intent of the adopted General Plan. Rather, the updates to the NLSP are being proposed to achieve the goals and vision of the General Plan by adding the necessary regulatory tools for implementation. Additionally, a Zoning Code amendment would be required to incorporate a new NLSP ordinance to regulate zoning consistent with the General Plan, replacing the existing Pasadena Municipal Code Chapter 17.34. • The General Plan established land use and corresponding density and intensity ranges but did not establish development and/or design standards (e.g., height limits, setbacks, etc.). The NLSP Update adds more specific standards to implement the General Plan Land Use categories for the NLSP area. It provides those development and design standards through zoning districts and land use regulations, thereby, further regulating the land uses studied in the GP EIR. • The proposed NLSP Update follows the plan area boundary with minor revisions noted below, and sets densities and intensity standards which are within the General Plan ranges with the exception of the following recommended amendments:
o Update the land use designation for parcels north of Washington Boulevard and west of Washington Theater from Medium Mixed-Use (0-87 du/ac and 0- Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
2.25 FAR) and Low-Medium Mixed-Use (0-48 du/ac and 0-1.75 FAR) to Low Mixed-Use (0-32 du/ac and 0-1.0 FAR).
o Update the land use designation for parcels north of Washington Boulevard at North Lake Avenue from Medium Mixed-Use (0-87 du/ac and 0-2.25 FAR) to Low-Medium Mixed-Use (0-48 du/ac and 0-1.75 FAR).
o Remove the four parcels designated Low-Density Residential at Howard Street from the NLSP.
o Update the land use designation and remove from the NLSP an area at the southwest corner of Rio Grande and Mentor Avenue from Medium Mixed-Use (0-87 du/ac and 0-2.25 FAR) to Low Density Residential (0-6 du/acre).
o Add parcels at the southeast corner of Washington Park and update the land use designation from Medium-Density Residential (0-32 du/ac) to Open Space.
o Update the land use designation for parcels southwest of Washington Boulevard and Hudson Avenue from Medium Mixed-Use (0-87 du/ac and 0-
2.25 FAR) to Low-Medium Mixed-Use (0-48 du/ac and 0-1.75 FAR).
o Remove the area northeast of Hudson and Claremont from the NLSP and update the land use designation from Medium Mixed-Use (0-87 du/ac and 0-
2.25 FAR) to Medium-High Residential for the northernmost three parcels and to Low-Density Residential (0-6 du/ac) for the southernmost four parcels.
o Update the land use designation for parcels southeast of Washington Boulevard and North Lake Avenue from Medium Mixed-Use (0-87 du/ac and 0-2.25 FAR) to Low Mixed-Use (0-32 du/ac and 0-1.0 FAR).
o Update the land use designation for parcels south of Washington Boulevard between Mentor and Catalina avenues from Medium Density Residential (16 du/ac) to Low Mixed-Use (32 du/ac and 0-1.0 FAR).
o Update the land use designation for parcels at North Lake Avenue and Mountain Street south to Orange Grove Boulevard from Low Commercial (0-
1.0 FAR) to Low-Medium Mixed-Use (0-48 du/ac and 0-1.75 FAR).
o Add the parcel at 826 Boylston to the NLSP and update the land use designation from Medium-High Density Residential (0-32 du/ac) to Low- Medium Mixed-Use (0-48 du/ac and 0-1.75 FAR).
o Add the parcel at 840 Earlham Street and change the land use designation from Institutional to Medium Mixed-Use (0-87 du/ac and 0-2.25 FAR).
o Add the parcels at 819 East Villa Street and 812-834 Santa Barbara Street and update the land use designation from Low-Medium Density Residential (0-12 du/ac) to Medium Mixed-Use (0-87 du/ac and 0-2.25 FAR).
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
o Remove the area designated Low-Density Residential on Mentor Avenue north of Bell Street from the NLSP.
o Remove the area designated Low-Density Residential on Mentor Avenue south of Mountain Street from the NLSP.
o Update the land use designation for the parcels at 701 and 709 N. Mentor Avenue from Low-Density Residential (0-6 du/acre) to Medium-High Density Residential (0-32 du/ac) and remove from the NLSP.
o Update the land use designation for the parcel at 919 E. Orange Grove Boulevard from Medium-Density Residential (0-16 du/acre) to Medium-High Density Residential (0-32 du/ac).
• The proposed NLSP establishes an overall vision for North Lake Avenue, the policies and standards apply specifically to private development and adjacent sidewalks.
Figure 3 illustrates the proposed NLSP Update boundary and General Plan land use designations within the Specific Plan area. Each designation has a corresponding density and intensity as defined by the General Plan.
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Figure 3 – Proposed North Lake
Specific Plan Boundary and
General Plan Land Use
Designations
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
2.4.2 Relationship to 1997 North Lake Specific Plan
The existing North Lake Specific Plan was adopted by the City Council in 1997 and amended on June 25, 2007 . The 2015 GP and corresponding GP EIR included some policies carried over from the 1997 North Lake Specific Plan (1997 SP). The purpose of the 1997 NLSP was to provide a safe pedestrian environment, support development near the Gold Line station, and minimize vehicle intrusions and its associated uses such as vehicles sales and drive - through businesses . The 1997 SP explored the relationship between land uses, design standards, and economic strategies to help accomplish the goal of healthy pedestrian - oriented and transit -oriented neighborhoods serving mixed -use business and residential districts. As such, the development and design standards listed in the 1997 SP are applicable to the parcels in the NLSP area until the NLSP Update being analyzed in this Addendum is adopted.
The proposed updates to the NLSP would build on the progress initiated by the 1997 SP and further the vision set by the 2015 General Plan by establishing land uses and zoning districts for a more cohesive approach to mixed -use development and public realm connectivity to support transit usage. The specific plan land uses organize land use types by zoning districts while development standards such as height restrictions, density limitations, parking requirements, public realm, etc. are regulated by location-based maps. The primary changes between the 1997 SP and the NLSP Update are updated policies and standards that align with the General Plan and address current and future community needs, opportunities, and challenges.
2.4.3 Proposed NLSP Updates
The vision and goals of the proposed NLSP Update are implemented through three sets of tools set forth in the NLSP. These tools include land use regulations, design and development standards, and public realm standards. The unique characteristics of North Lake are articulated through defined subareas. Each subarea is implemented by one or more zoning districts that regulate permitted land use types. Figure 4 shows proposed subareas.
Development standards are regulated by location, not zoning districts, and include standards that improve building design and require site design that complements existing defining features of the neighborhood’s built form, such as consistent setbacks, open space requirements, parking location requirements, and landscaping. General discussions on the development and design standards to be implemented under the NLSP Update are included below.
The zoning district naming conventions reflect their location within a specific plan (NL is used as the zone prefix) as well as the land uses allowed within that zone. The proposed zoning districts would become effective once codified following Council adoption of the proposed NLSP Update. Figure 5 shows proposed zoning districts for the NLSP area.
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Figure 4 – Proposed North Lake
Specific Plan Subareas
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Figure 5 – Proposed North Lake
Specific Plan Zoning Districts
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Specific Plan Boundary
As discussed in Section 2.2, the proposed NLSP area is generally bounded by Maple Avenue and the I-210 Freeway to the south; Elizabeth Street to the north; Catalina Avenue, Mentor Avenue, and Wilson Avenue to the east; and El Molino Avenue and Hudson Avenue to the west. Specific modifications to the proposed plan boundary are described above in the Relationship to the 2015 General Plan section.
Land Use
The proposed updates to the NLSP would update zoning districts tailored to current community needs in alignment with the General Plan vision. The focus of the NLSP Update allows for financially feasible commercial and residential developments, and helps ensure that new buildings, streetscape improvements, and added amenities contribute positively to the pedestrian experience. This updated approach to land use regulation would support a mixed- use area that creates a range of opportunities for higher -density, transit-oriented development, served by multimodal linkage s, and pedestrian open space amenities. The NLSP Update would contain the following zones and corresponding objectives:
• Mixed-Use Core (NL -MU-C) – create mixed -use activity centers that encourage a range of active uses where people can walk to shops, restaurants, jobs, and entertainment in proximity to transit ; s upport projects that are entirely commercial, entirely residential, or mixed -use, with ground floor commercial required at key intersections.
• Mixed-Use Neighborhood (NL -MU-N) – promotes the development of pedestrian friendly neighborhoods with commercial uses that are sensitive to neighboring residents; support projects that are entirely commercial, entirely residential, or mixed- use, integrated either horizontally or vertically consistent with ground floor use requirements.
• Residential Multi-family (NL-RM-48/32/16) – maintain the current uses and protect the existing residential character using City of Gardens standards. • Residential Single -family (NL -RS-6) – provide areas for low density residential neighborhoods and relate new development to the existing environment. • Open Space (OS) – provide opportunities for parks and recreation to residents and visitors.
• Public Semi-Public (PS) – provide for large public or semi -public land uses that may not be appropriate in other base zoning districts.
Mass and Scale, Intensity and Density
The General Plan 2015 Land Use Element designates intensities and density ranges in the NLSP area to support the vision of a series of pedestrian -oriented villages and districts with unique identities, bolstered by their vibrant mix of uses, amenities, and streetscapes. Updates included in the NLSP are intended to:
• Implement the General Plan density ranges , measured as dwelling units per acre (du/ac), and intensity by floor area ratios (FAR);
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
• Shape development in a manner that creates a defined public realm and appropriate scale of buildings for a visually appealing community;
• Reduce building massing through setback and stepback requirements that create appropriate transitions to residential neighborhoods;
• Support high-quality architecture and urban design through modulation requirements and a height averaging incentive;
• Require appropriate transitions to designated historic resources; and • Support opportunities to increase housing near transit and require various unit sizes to support individuals and families.
The Specific Plan generally implements the allowed density (du/ac) ranges and intensity (FAR) set by the General Plan Land Use Diagram and regulates density within the maximum density studied by the General Plan EIR.
Urban Design
Design standards for ground floor frontages proposed by the NLSP Update would help refine building mass and scale and support high -quality architecture and urban design. Frontage standards would prioritize pedestrian access by ensuring doorways are open to a public sidewalk or other public space; increase visibility into ground floor uses to create visual interest for pedestrians; promote shade through arcades and shade structures; support a consistent character when different uses are allowed on the ground floor within the same black; and limit blank walls on the ground floor to enhance visual interest and pedestrian comfort. The proposed standards are established for each block and are complementary to the previously discussed land use permissions. In mixe d-use districts, ground floor requirements are regulated by frontage type, with varying setback depths depending on the percentage of commercial or residential ground floor space to allow for common space and other amenities. A successful ground floor design would create an inviting, visually engaging, shaded sidewalk and pedestrian environment that supports the intended commercial, residential, or mixed-use character of each district. Proposed ground floor standards would reflect community interest to improve the pedestrian experience at the street -level based on the following parameters:
• Façade Modulation
• Ground Floor Height
• Location of Primary Entrances
• Amount of Street-Facing Transparency
• Minimization of Blank Walls
Open Space
The proposed updates to the NLSP would include open space requirements that would support high quality, accessible and usable open space across a variety of types that contribute to an active public realm and successful building design. Residential open sp ace would be required based on the number of bedrooms, which would result in larger units having a larger open space requirement. Required open space may be private to individual units or common among tenants. The amount of publicly accessible open space required is also based on the size of a proposed project. These changes are intended to expand the amount of open space available to residents and employees along the corridor.
Chapter 2: Project Description North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Parking
Vehicle parking requirements proposed by the updates to the NLSP would lower the parking requirement for some commercial uses to allow more flexibility for business owners as uses change over time; these modified standards are designed to support economic stability and reduce vacancies through simplified regulation. Residential parking requirements would also be reduced in part of the plan area not exempt from parking requirements by State law. The NLSP further proposes as a future implementation action a Streetscape Program for North Lake Avenue which could study the feasibility of modifying the cross-section of the street and potentially changing its on-street parking.
Public Realm & Setbacks
Public realm requirements proposed by the NLSP Update would improve sidewalk conditions and the pedestrian experience by ensuring that a minimum sidewalk width is achieved by reinforcing existing widths or requiring slight increases in key locations as new development occurs. The NLSP Update builds on the Pasadena Street Design Guide to ensure sufficient widths to create a sidewalk environment that supports functional activities.
The sidewalk width requirements would correlate with the level of activity and surrounding densities, intensities, and uses identified in the NLSP area and address community desire for wider sidewalks. New width requirements for sidewalk zones of at least 12 -feet will support adequate space for street trees, parkways, pedestrian movement, and other amenities. The NLSP Update would require parkways and street trees to be provided by new development, and trees would be required to be planted in larger tree we lls and follow new planting requirements to better support tree health.
As mentioned in the open space sub -section, some developments in the NLSP area are required to provide plazas or paseos, particularly near the major intersections of North Lake Avenue/Villa Street and North Lake Avenue/Washington Avenue, to meet requirements for publicly accessible open space. Proposed requirements and guidelines are intended to increase pedestrian connectivity and visual interest by reducing large block sizes and providing additional publicly accessible open space , improving walkability and creating safe spaces for pedestrian gathering and movement.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
CHAPTER 3
EVALUATION OF ENVIRONMENTAL IMPACTS
The following evaluation assesses the environmental impacts of the proposed NLSP Update in relation to the analysis provided in the 2015 GP EIR. Determinations are made as to whether the proposed project would result in new significant impacts or substantially more severe effects, which would trigger the need for a Subsequent or Supplemental EIR.
For each threshold identified below, the following questions are addressed and discussed in the narrative for each issue:
What is the NLSP Update’s impact conclusion?
For each impact identified below, a level of significance of the impact is provided. While criteria for determining significant impacts are unique to each issue area, the environmental analysis applies a uniform classification of the impacts based on the following definitions consistent with CEQA and its implementing CEQA Guidelines:
• No Impact (NI) – A designation of no impact is given when no changes in the environment would occur.
• Less than Significant Impact (LTS) – A less than significant impact would cause no substantial adverse change in the environment.
• Less than Significant Impact with Mitigation (LTS-M) – A less than significant impact with mitigation incorporated avoids substantial adverse impacts on the environment with adherence to identified mitigation measures. For those issue areas where the impact of the NLSP Update would be less than significant with the incorporation of the same mitigation measure(s) identified in the GP EIR, the impact is identified as LTS-M(GP). The number of the mitigation measure from the MMRP will be referenced and summarized in Chapter 4.
• Significant and Unavoidable Impact (S-U) – A significant unavoidable impact would cause a substantial adverse effect on the environment, and no feasible mitigation measures would be available to reduce the impact to a less than significant level.
What is the GP EIR impact conclusion? The issues that were found to be either less than significant or were found to have no impact in the Initial Study prepared for the GP Update and were therefore excluded from further analysis in the GP EIR, are identified with (IS) after the impact conclusion.
Does the NLSP Update involve new significant impacts or substantially more severe impacts than those analyzed in the GP EIR?
Are there any new or changed circumstances involving new significant impacts or substantially more severe impacts than those analyzed in the GP EIR?
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Is there any new information of substantial importance that was not and could not have been known at the time of certification of the GP EIR that rises to the level of requiring new analysis or verification?
Are any new mitigation measures required for the NLSP Update?
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
I. AESTHETICS.
Would the project:
a) Have a substantial adverse
effect on a scenic vista? LTS LTS No No No No
b) Substantially damage scenic
resources, including, but not
limited to, trees, rock
outcroppings, and historic
buildings within a state
scenic highway?
LTS LTS (IS) No No No No
c) Substantially degrade the
existing visual character or
quality of the site and its
surroundings?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
d) Create a new source of
substantial light or glare
which would adversely affect
day or nighttime views in the
area?
LTS LTS No No No No
Discussion:
The GP EIR concluded that implementation of the approved General Plan Update, specifically including buildout of the NLSP area, would result in less than significant environmental impacts to aesthetics. While buildout of the General Plan would result in redevelopment in the NLSP area, the GP EIR found that development in accordance with the General Plan Land Use Element would not significantly impact views of the San Gabriel Mountains . The GP EIR concluded because the north –south alignment of the street grid and the low -density nature of the neighborhood would be preserved; continued views of the San Gabriel Mountains would be available at buildout.
As detailed in Section 2.4, proposed updates to the NLSP primarily focus on refining and/or establishing land uses and zoning districts, as well as objective development standards to achieve the goals and vision of the General Plan. The NLSP Update proposes two zoning Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
districts that allow for the development of higher intensity mix of retail, office, and multi -family housing uses in proximity to the Metro A Line station that expand the customer base for local businesses. Updates included in the proposed NLSP are intended to implement the densities and intensities analyzed in the GP EIR, shape development in a manner that creates a defined public realm and appropriate scale of buildings for a visually appealing community, reduce building massing through setback and stepback requirements that create appropriate transitions to residential neighborhoods, support high-quality architecture and urban design through modulation requirements and a height averaging exception , and require appropriate transitions to designated historic resources. To accomplish this, the NLSP Update generally implements the allowed density ranges and intensity set by the General Plan Land Use Diagram and regulates density within the maximum density studied by the General Plan EIR. Overall, the GP EIR concluded that proposed land use changes in the General Plan Update, and specifically as they pertain to the NLSP area, would not adversely impact visual and scenic quality, but would instead ensure that established residential neighborhoods would not be adversely affected by new mixed-use and commercial projects.
As the proposed NLSP Update would align with and implement the General Plan, buildout of the NLSP Update would not significantly impact visual character or quality.
Additionally, as discussed in the GP EIR, there are no designated state scenic highways located within the NLSP area. Although permitted development under the approved General Plan Update could result in increased light and glare, the NLSP area is primarily developed, Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
and any new development would be required to adhere to the Municipal Code and other regulations related to light and glare. Thus, the GP EIR found this issue to be less than significant.
Furthermore, the current CEQA Guidelines Appendix G checklist also recommends considering a project’s potential to conflict w ith applicable zoning and other regulations governing scenic quality if the project is located in an urbanized area. As discussed, the proposed NLSP updates include additional land use regulations and establish development/design standards. Similar to the General Plan Update, these NLSP updates would not significantly impact views of the San Gabriel Mountains and would improve the aes thetic quality of new development as well as help refine the existing character within the NLSP area through enhancements to the public realm . Therefore, impacts related to scenic quality would be less than significant with implementation of the NLSP Update.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the p roposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
II. AGRICULTURAL RESOURCES.
Would the project:
a) Convert Prime Farmland,
Unique Farmland, or
Farmland of Statewide
Importance (Farmland), as
shown on the maps prepared
pursuant to the Farmland
Mapping and Monitoring
Program of the California
Resources Agency, to non-
agricultural use?
NI NI (IS) No No No No
b) Conflict with existing zoning
for agricultural use, or a
Williamson Act contract?
NI NI (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
c) Conflict with existing zoning
for, or cause rezoning of,
forest land (as defined in
Public Resources Code
Section 12220[g]), timberland
(as defined by Public
Resources Code Section
4526), or timberland zoned for
Timberland Production (as
defined by Government Code
Section 51104[g])?
NI NI (IS) No No No No
d) Result in the loss of forest
land or conversion of forest
land to non-forest use?
NI NI (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
e) Involve other changes in the
existing environment which,
due to their location or nature,
could result in conversion of
Farmland, to non-agricultural
use?
NI NI (IS) No No No No
Discussion:
Agriculture and forestry resources were addressed in the Initial Study (IS) prepared for the GP EIR, which found that no impacts to this topic would occur following the implementation of the General Plan Update. The Zoning Code permits commercial growing in designated zoning districts; however, the IS stated that the General Plan Update did not alter uses permitted by the Zoning Code, and the objectives of the General Plan Update did not relate to or conflict with commercial growing. 1 The IS also stated that there are no Williamson Act contracts in the City, nor is any part of the City designated as timberland, forest land, or farmland; as such these types
1 City of Pasadena, Initial Study/Notice of Preparation, 2013.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
of lands would not be converted to another use. 2 The General Plan Update did not have any impacts on agriculture and forestry resources.
Similar to the General Plan Update, the proposed NLSP Update would not alter zoning districts or permitted land uses in a way that conflicts with the Zoning Code regarding the conversion of farmland, timberland, or forest land. While the proposed NLSP Update includes additional land use regulations and establishes development/design standards, the objectives of the NLSP Update do not include land use provisions or regulations around commercial growing and do not include any land designated as timberland, forest land, or farmland.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the p roposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
2 City of Pasadena, Initial Study/Notice of Preparation, 2013.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
III. AIR QUALITY.
Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
a) Conflict with or obstruct
implementation of the
applicable air quality plan?
S-U S-U No No No No
b) Violate any air quality
standard or contribute to an
existing or projected air
quality violation?
S-U S-U No No No No
c) Result in a cumulatively
considerable net increase
of any criteria pollutant for
which the project region is
non-attainment under an
applicable federal or state
ambient air quality
standard?
S-U S-U No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
d) Expose sensitive receptors
to substantial pollutant
concentrations?
LTS-M(GP) LTS-M No No No No
e) Result in other emissions
(such as those leading to
odors) adversely affecting a
substantial number of
people?
LTS-M(GP) LTS-M No No No No
Discussion:
The GP EIR found that potentially significant impacts to air quality would occur if mitigation measures were not incorporated; in some instances, the GP EIR found impacts to air quality to be significant and unavoidable because no feasible mitigation measures would be available to reduce impacts to a less than significant level. The City of Pasadena is entirely within the South Coast Air Bas in (SCAB) and therefore must comply with the rules and regulations imposed by the South Coast Air Quality Management District (SCAQMD).
The SCAB is also subject to the California Ambient Air Quality Standards (CAA QS) adopted by the California Air Resources Board Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
(CARB) and the National Ambient Air Quality Standards (NAAQS) adopted by the federal government. The SCAB is designated a nonattainment area (i.e., an area that does not meet the ambient air quality standards) for ozone (O3), fine inhalable particulate matter (PM2.5), and coarse inhalable particulate matter (PM10) under the CAAQS, and a nonattainment area for O 3, PM 2.5, and lead (Los Angeles County only) under the NAAQS.3 The GP EIR concluded that buildout of the General Plan Update would increase employment and population beyond current SCAG forecasts and contribute to cumulative SCAB nonattainment designations. While certain aspects of the General Plan Update Land Use Plan would lead to improvements in transportation and thus decrease emissions from that source, the GP EIR found that even with implementation of Mitigation Measure 2 -1, requiring the preparation of a technical assessment evaluating potential project construction-related air quality impacts to the City Planning Division prior to issuance of construction permits, and Mitigation Measure 2-2, requiring the preparation of a technical assessment evaluating potential project operation-related air quality impacts to the City Planning Division prior to project approval, construction and operation impacts would not be reduced below the required SCAQMD thresholds, and that future impacts could be significant and unavoidable. The GP EIR stated that although submission of a technical assessment for possible construction related impacts required by Mitigation Measure 2-1 could reduce criteria air pollutant impacts for individual projects, the cumulative impact of all future construction emissions would result in sig nificant and unavoidable impacts. In relation to the operation of buildout, the GP EIR stated that future activity would exceed SCAQMD thresholds
3 California Air Resources Board (CARB). 2014a, April 17. Area Designations Maps/State and National. http://www.arb.ca.gov/desig/adm/adm.htm Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
as well, and that while Mitigation Measure 2-2 requiring the submission of an emissions assessment for operation -related impacts for individual future development projects , could reduce individual project impacts, the cumulative impacts of the General Plan Update buildout would be significant and unavoidable. The GP EIR found that implementation of the General Plan Update could expose existing or planned sensitive receptors to criteria air pollutants and toxic air contaminants (TACs), but that Mitigation Measure 2-3, requiring the submittal of a Health Risk Assessment (HRA) for certain new industrial or warehousing land uses requiring use of diesel trucks within 1,000 feet of a sensitive land use prior to project approval, would ensure that mobile sources of TACs not covered under SCAQMD permits would be considered during subsequent project-level environmental review.
The HRA prepared for those projects identified under Mitigation Measure 2 -3 would identify project -specific measures to minimize health risk and individual projects would be required to achieve the incremental risk thresholds established by SCAQMD, thus reducing impacts to less than significant. This, however, would only reduce the impact on a project-by-project basis, and the GP EIR concluded that the future buildout of the General Plan Update would result in cumulative impacts to sensitive recept ors that are significant and unavoidable. The GP EIR found that Mitigation Measures 2 -4 and 2 -5 would require that major sources of air pollutants achieve incremental risk thresholds when placed near a sensitive receptor, as well as practice measures to minimize od ors, reducing both impacts to a less than significant level.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
The proposed NLSP falls within the City of Pasadena and thus within the bounds of the area analyzed by the GP EIR; however, the NLSP area only accounts for a small portion of the area analyzed under the GP EIR. The NLSP Update includes parcels that are generally bounded by Maple Avenue and the I-210 Freeway to the south; Elizabeth Street to the north; Catalina Avenue, Mentor Avenue, and Wilson Avenue to the east; and El Molino Avenue and Hudson Avenue to the west . The NLSP area is primarily built out, and the proposed NLSP Update would govern land uses and improvements.
Buildout of the proposed NLSP Update would address the following goals and policies related to Air Quality that the General Plan Update proposed for the City’s Land Use Element for North Lake: Goal 36, Policy LU 36.2: Provide for the development of a higher intensity mix of retail, office, and multi-family housing uses in proximity to the Metro A Line station that expand the customer base for local business and support Metro A Line ridership contributing to the reduction of vehicle trips, energy consumption, and GHG emissions; and Goal 36, Policy 36.5: Design Lake Avenue and Washington Boulevard as complete streets that accommodate transit, bicycle, and pedestrian use. This includes wider sidewalks, public plazas, parks and parklets, bike lanes, bicycle parking and wayfinding signage for pedestrians and bicyclists. Such goals and policies would contribute to reductions in vehicle trips, energy consumption, and GHG emissions.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP
Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at
the Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
It is likely that, similar to the impacts addressed in the GP EIR, impacts to air quality from the buildout of the proposed NLSP Update would be less than significant for each individual project (and will be analyzed on a project-by-project basis), but that the magnitude of future buildout , even though less than assumed under the GP EIR, could result in cumulative impacts that are significant and unavoidable. GP EIR Mitigation Measures 2-1 through 2-5 would be applicable to the proposed NLSP Update. Implementation of these mitigation measures would not result in increased impacts from those identified in the GP EIR and given that the NLSP area is proposed to be smaller in geographic area and with a smaller built out capacity than the area analyzed under the GP EIR, the NLSP would be anticipated to result in less impacts compared to those identified in the GP EIR.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur, nor would the significant unavoidable impacts identified in the GP EIR be worsened. Likewise, there is n o new information of substantial importance requiring new analysis or verification. The project does not propose substanti al changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
IV. BIOLOGICAL RESOURCES
Would the project:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
a) Have a substantial adverse
effect, either directly or
through habitat modifications,
on any species identified as a
candidate, sensitive, or
special status species in local
or regional plans, policies, or
regulations, or by the
California Department of Fish
and Wildlife or U.S. Fish and
Wildlife Service?
LTS LTS-M No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
b) Have a substantial adverse
effect on any riparian habitat
or other sensitive natural
community identified in local
or regional plans, policies,
regulations, or by the
California Department of Fish
and Game or U.S. Fish and
Wildlife Service?
LTS LTS-M No No No No
c) Have a substantial adverse
effect on state or federally
protected wetlands (including,
but not limited to, marsh,
vernal pool, coastal, etc.)
through direct removal, filling,
LTS LTS-M No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
hydrological interruption, or
other means?
d) Interfere substantially with the
movement of any native
resident or migratory fish or
wildlife species or with
established native resident or
migratory wildlife corridors, or
impede the use of native
wildlife nursery sites?
LTS LTS (IS) No No No No
e) Conflict with any local policies
or ordinances protecting
biological resources, such as
a tree preservation policy or
ordinance?
NI NI (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
f) Conflict with the provisions of
an adopted Habitat
Conservation Plan, Natural
Community Conservation
Plan, or other approved local,
regional, or state habitat
conservation plan?
NI NI (IS) No No No No
Discussion:
The GP EIR identified four areas within the boundaries of the General Plan Update area where sensitive natural habitats occur to varying degrees, including Arroyo Seco, Eaton Canyon Corridor, Hastings Canyon, and the San Rafael Hills ; however, the land use changes included within the General Plan Update would be confined to the eight specific plan areas within the City, none of w hich contain sensitive natural habitats and all of which are urbanized or suburban in character. Yet, becau se Arroyo Seco, Eaton Canyon Corridor, Hastings Canyon, and the San Rafael Hills all contain sensitive natural habitats, the GP EIR concluded that buildout of the General Plan Update could cause potentially significant impacts to biological resources. The GP EIR found that Arroyo Seco, E aton Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Canyon, and Hastings Canyon all contain jurisdictional waters, and that the San Rafael Hills contain riparian and/or wetland habitat.
No land use changes were proposed in these areas; however, the GP EIR states that buildout of the General Plan Update could have potentially significant impacts to sensitive species, sensitive natural communities, and jurisdictional waters and/or wetlands.
Mitigation Measures 3 -1 through 3 -6 would ensure that a qualified biologist would be involved in the assessment, mitigation, and monitoring of all projects occurring on land where impacts to biological resources could be potentially significant; impacts would then be reduced to a less than significant level following implementation of the mitigation measures. The IS prepared for the GP EIR found that development projects approved under the GP Update, including within the City’s eight specific plan areas , would be required to comply with the City’s Master Street Tree Plan, Chapter 17.44 (Landscaping) of the City’s Zoning Code, and the Migratory Bird Treaty Act (MBTA), as applicable. As such, the General Plan Update’s impact on overland wildlife movement and m igration would be less than significant and the General Plan Update would not conflict with the City’s tree protection ordinance. Additionally, the IS prepared for the GP EIR indicated that there are no adopted habitat conservation or natural community conservation plans within the City and, as such, concluded that no impacts to such plans would result from the General Plan Update.
As stated in the GP EIR, all proposed land use changes would be confined to the eight specific plan areas in the City, includ ing the proposed NLSP area. The proposed NLSP area is designated as urban and suburban developed land containing some developed Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
open space.4 The GP EIR concluded that the specific plan areas, inclusive of the proposed NLSP area, did not contain any sensitive natural habitats, jurisdictional waters, or wetlands. As such, there are no Mitigation Measures applicable to the proposed NLSP Update.
Similar to the General Plan Update, development under the NLSP Update would be required to comply with the City’s Master Street Tree Plan, Chapter 17.44 (Landscaping) of the City’s Zoning Code, and the MBTA, as applicable. Therefore, development under the NLSP Update would not conflict with the City’s tree protection ordinance and impacts to wildlife movement and migration would be less than significant. Additionally, as indic ated in the IS prepared for the GP, there are no adopted habitat conservation or natural community conservation plans within the City. Therefore, the proposed NLSP Update would not result in impacts to any such plans.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
4 City of Pasadena. 2015 General Plan EIR: Figure 5.3-1, Vegetation Zones.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
V. CULTURAL RESOURCES
Would the project:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
a) Cause a substantial adverse
change in the significance of a
historical resource pursuant to
CEQA Guidelines Section
15064.5?
LTS LTS-M No No No No
b) Cause a substantial adverse
change in the significance of
an archaeological resource
pursuant to CEQA Guidelines
Section 15064.5?
LTS-M(GP) LTS-M No No No No
c) Directly or indirectly destroy a
unique paleontological
resource or site or unique
geologic feature?
LTS LTS-M No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
d) Disturb any human remains,
including those interred
outside of formal cemeteries?
LTS LTS No No No No
Discussion:
The GP EIR found that, while the General Plan Update did not propose the alteration or demolition of any historic landmarks, any development under buildout of the General Plan Update could potentially impact a historic resource, as the GP EIR lists 7,440 historical resources throughout the City which meet at least one state or national criteria. The GP EIR states that the likelihood of encountering and impacting a historical resource is greater within a historic district, and that any specific plan area tha t is within or adjacent to a historic district has a greater likelihood for impacting historical resources. The Central District, North Lake, and Fair Oak s/Orange Grove Specific Plan Areas contain and/or are adjacent to historic landmarks and/or historic distri cts. The GP EIR states that future projects under the buildout of the General Plan Update can avoid significantly impacting historical resources by adhering to the Pasadena Municipal Code 17.61.030 design review, to state and federal regulations, and to the policies of the City’s Land Use Element, including Policy LU 8.5, Scale and Character of New Construction in Designated Landmark and Historic Districts.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Additionally, Mitigation Measure 9-4, which is discussed in Section XIII, would ensure that vibrations from construction activity would not impact architectural structures of historical significance. Impacts to archaeological resources can be reduced to a less than significant level upon implementation of Mitigation Measure 4 -1, which would halt construction upon discovery of an archaeological resource and require consultation with a registered archaeologist before proceeding with development. The GP EIR lists the Topanga Formation as an area sensitive to paleontological resources and states that implementation of Mitigation Measure 4 -2, which would enlist the service of a registered paleontologist prior to any grading activity in the vicinity of this area, as a sufficient measure to reduce the impact to a less than significant level. The GP EIR concluded that grading activities within the General Plan Update area are not expected to disturb human remains.
The NLSP area includes historically designated resources, City identified Landmark Buildings, and properties of significant historic character. The proposed NLSP Update would include development standards for Historic Adjacency. Projects on parcels with a designated historic resource in the NLSP Update would be subject to review for consistency with the Secretary of the Interior’s Standards. Projects sharing a property line with a designated historic resource in the NLSP Update would be subject to development standards, including height, massing, and setback limitations. Additionally, similar to the General Plan Update, proposed development in the NLSP area would be required to adhere to the Pasadena Municipal Code 17.61.030 design review, to state and federal regulations, and to the policies of the City’s Land Use Element, including Policy LU 8.5, Scale and Character of New Construc tion in Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Designated Landmark and Historic Districts. Therefore, buildout of the NLSP Update is not expected to significantly impact historical resources.
If archaeological resources are discovered during construction of any project under the buildout of the proposed NLSP Update, GP EIR Mitigation Measure 4-1 would be implemented, and the impact level would be less than significant. As the NLSP area is not listed as a sensitive paleontological area, projects under buildout of the proposed NLSP Update would not significantly impact these resources.5 As the NLSP area is within the area analyzed by the GP EIR and found not likely to contain unknown human remains, the proposed NLSP Update would not significantly impact human remains with the required compliance with the Health and Safety Code.
The current CEQA Guidelines Appendix G checklist also includes assessment criteria for potential impacts to tribal cultural resources.
Tribal cultural resources are defined in Public Resources Code section 21074 as either a site, feature, place, cultural l andscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a C alifornia Native American tribe. These types of resources were analyzed in the GP EIR and Native American consultation was conducted. No sacred lands were identified in the NLSP area during consultation. The GP EIR concluded that the results of the Native American
5 City of Pasadena. 2015 General Plan EIR. Figure 5.4-2: Paleontological Sensitivity.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
consultation did not result in new information or unknown impacts, but that while there are no known sacred lands within the City, the potential to uncover archaeological resources during grading remains. Buildout of the NLSP Update would incorporate GP EIR Mitigation Measure 4-1 if any archaeological resources, including tribal cultural resources, are discovered during construction, reducing the impact level to less than significant.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
Any New
Information
of
Substantial
Importance
That Was
Not and
Are Any
New
Mitigation
Measures
Required
for the
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Impacts than
those
analyzed in
the GP EIR?
More Severe
Impacts than
those analyzed
in the GP EIR?
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
NLSP
Update?
VI. ENERGY
Would the project:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
a) Conflict with adopted energy
conservation plans? LTS LTS (IS) No No No No
b) Use non-renewable resources
in a wasteful and inefficient
manner?
LTS LTS (IS) No No No No
Discussion:
Energy was not addressed in the GP EIR, as the IS prepared for the GP EIR found that impacts to this topic from buildout of the General Plan would be less than significant. The IS stated that Pasadena’s Department of Water and Power (PWP) had the capacity to service the projected buildout of the General Plan Update.6 Additionally, the IS stated that the City of Pasadena is wholly within the bounds of a Southern California Gas Company service area. Forecasted use from the buildout of the General Plan Update – which would be an increase in energy use - was found to be w ithin the capacity of existing facilities. 7 All new development and tenant
6 City of Pasadena, Initial Study/Notice of Preparation, 2013. 7 City of Pasadena, Initial Study/Notice of Preparation, 2013.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
improvements would be required to comply with the California Energy Code, Part 6 of the California Building Standards Code (T itle 24), CALGreen standards, Leadership in Energy and Environmental Design (LEED) standards, the City’s Green Action Plan, the City’s Green Building Standards Code (14.04.504), and the Open Space and Conservation Element of the General Plan, which together would increase efficiency and decrease consumption levels compared to existing structures built under the 2008 Building and Energy Efficiency Standards or targets established prior to those standards.8 As such, the intensification of energy use resulting from buildout of the General Plan Update would result in a less than significant impact.
The proposed NLSP Update is located within the boundaries of the area that was captured under the IS and GP EIR. New developments in the NLSP area would be required to comply with the California Energy Code, Part 6 of the California Building Standards Code (Title 24), CALGreen standards, the City’s Climate Action Plan, and the City’s Green Building Standards Code, which collectively would increase efficiency and decrease consumption levels. Any new developments in the NLSP area would require lateral connections to mainlines in coordination with existing utility service providers. While the land use types under the proposed NLSP Update would encourage multifamily residential and mixed -use zoning, and thereby potentially increase demand in energy over existing conditions, the proposed NLSP area is largely developed and urbanized under existing conditions, and this increase in
8 City of Pasadena, Initial Study/Notice of Preparation, 2013.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
development is not expected to exceed forecasted use captured under the IS and GP EIR. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
VII. GEOLOGY AND SOILS
Would the project:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
a) Expose people or structures to
potential substantial adverse
effects, including the risk of
loss, injury, or death involving:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
i. Rupture of a known
earthquake fault, as
delineated on the most
recent Alquist-Priolo
Earthquake Fault Zoning
Map issued by the State
Geologist for the area or
based on other substantial
evidence of a known fault?
Refer to California
Geological Survey Special
Publication 42.
LTS LTS (IS) No No No No
ii. Strong seismic ground
shaking? LTS LTS (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
iii. Seismic-related ground
failure, including
liquefaction as delineated
on the most recent
Seismic Hazards Zones
Map issued by the State
Geologist for the area or
based on other substantial
evidence of known areas
of liquefaction?
LTS LTS (IS) No No No No
iv. Landslides as delineated
on the most recent
Seismic Hazards Zones
Map issued by the State
Geologist for the area or
based on other substantial
LTS LTS (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
evidence of known areas
of landslides?
b) Result in substantial soil
erosion or the loss of topsoil? LTS LTS (IS) No No No No c) Be located on a geologic unit
or soil that is unstable, or that
would become unstable as a
result of the project, and
potentially result in on-or off-
site landslide, lateral
spreading, subsidence,
liquefaction or collapse?
LTS LTS (IS) No No No No
d) Be located on expansive soil,
as defined in Table 18-1-B of
the Uniform Building Code
LTS LTS (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
(1994), creating substantial
risks to life or property?
e) Have soils incapable of
adequately supporting the use
of septic tanks or alternative
wastewater disposal systems
where sewers are not
available for the disposal of
wastewater?
NI NI (IS) No No No No
Discussion:
Geology and soils were addressed in the IS prepared for the GP EIR, which found that impacts to this topic would be less than significant following the implementation of the General Plan Update. According to the Safety Element of the General Plan one Alquist -Priolo earthquake fault zone along the Raymond Fault, an active strand of the Sierra Madre Fault, and a possibly active strand of the Sierra Madre Fault pass through the City, and the San Fernando and Whittier Faults are located within 10.5 and 15.5 miles from the C ity, Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
respectively. All active faults could experience a surface rupture in the lifetimes of development resulting from buildout of the General Plan Update. The Safety Element, California Building Code, the City’s Building and Safety Division, and the City Build ing Code would require all new development to comply with policies and regulations surrounding surface ruptures and would be required to con duct and submit engineering geology and soils reports prior to permit approval. Policies within the above stated regulatory setting would also enforce specific building standards related to seismic ground shaking, as the soil in the City is either sandy, stony, or gra velly loam formed on the alluvial fan adjacent to the San Gabriel Mountains, which are soil types charac terized as loose and porous and thus susceptible to seismic ground shaking. Geotechnical investigations be required for all new development approval as the City contains zones where liquefaction could occur near Arroyo Seco, in the San Rafael Hills, and ne ar Eaton Canyon and Hastings Canyon. State and City building codes contain standards that new development must comply with pertaining to liquefaction as well. Geotechnical investigations would also be required to investigate and recommend measures to reduce the potential for landslides and building designs would be required to comply with slope standards, as the City is susceptible to earthquake -induced landslides originating in the San Gabriel Mountains and San Rafael Hills. The IS concluded that natural water soil erosion potential in the City is low, that future construction has the possibility to expose soil to erosion, and that all construction activity would be required to practice soil erosion mitigation practices and adhere to a transport and grading control plan as required by the Los Angeles County Stormwater Program.
The above-mentioned potential for landslides and liquefaction in addition to the susceptibility to lateral spreading and/or collapse due to the project location and quality of the soil would need to be included in each geotechnical investigation. Groundwater extraction Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
would be monitored by the Raymond Basin Management Board to ensure the continued prevention of regional subsidence. 9 Finally, each geotechnical investigation would be required to address soil expansion and each project would be required to comply with the associated standards of the Building and Safety Division and California Building Code. As the project area is urbanized, septic tanks would not be utilized during buildout of the General Plan Update. Development would include sewer lateral lines and would not rely on septic tanks or alternative wastewater disposal systems. With adherence to all regulations and policies, submission of a geotechnical report, and implementation of appropriate practices during construction, the IS concluded that buildout of the General Plan Update would have a less than significant impact to geology and soils.
The proposed NLSP falls within the same City boundaries as were analyzed in the IS, and therefore is subject to similar risks and associated potential impacts related to geology and soils. Therefore, the NLSP Update would not cause significant impacts beyond those analyzed in the IS for the GP EIR. Additionally, buildout of the proposed NLSP Update would be required to adhere to the same regulations, policies, and standards pertaining to geology and soil s impacts, both during construction and operation, including the preparation of project-specific geotechnical investigations for individual development projects.
9 City of Pasadena, Initial Study/Notice of Preparation, 2013.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the p roposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
VIII. GREENHOUSE GAS EMISSIONS
Would the project:
a) Generate greenhouse gas
emissions, either directly or
indirectly, that may have a
significant impact on the
environment?
S-U S-U No No No No
b) Conflict with an applicable
plan, policy or regulation
adopted for the purpose of
reducing the emissions of
greenhouse gases?
LTS LTS No No No No
Discussion:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
The GP EIR concluded that while certain improvements under the buildout of the General Plan Update would reduce Greenhouse Gas (GHG) emissions per service population, the buildout would still create more GHG emissions than existing conditions and would not achieve long-term GHG reduction goals under Executive Order S -03-05 and target levels of AB 32; after implementing Mitigation Measure 5-1, which required the City to prepare a community climate action plan/greenhouse gas reduction plan, the impacts related to GHG emissions would remain significant and unavoidable. Forecasting tools to measure future emissions from transportation, energy, waste, water/wastewater, and other sources (landscaping equipment, light commercial equipment, and construction equipment) provided a short -term projection for future levels; however, these projections were found to be insufficient given the uncertainty of how the General Plan Update buildout would be phased. The GP EIR found that without implementation of a community climate action/GHG reduction plan and under current state and federal regulations, the population growth that would result from buildout of the General Plan Update would prevent the City from meeting AB 32 targets for emissions. While buildout would imp rove transportation by creating a live/work environment, offering options for alternative and multi-modal mobility, and utilizing energy efficient design and technology, the GP EIR stated that the population growth would still create more emissions than existing c onditions. The community climate action plan/greenhouse gas reduction plan would establish community -wide targets, monitoring , and inventory reporting standards. The GP EIR established that the community-wide GHG emissions inventory would be updated every five years, and additional programs would be established to work in conjunction with the initial community climate action plan/greenhouse gas reduction plan (programs specific for building energy, transportation, waste, water, wastewater, agriculture, etc. ). The GP EIR Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
concluded that it is uncertain whether buildout would create significant and unavoidable GHG related impacts without knowing the phasing of buildout or what future federal, state, and local programs will exist at the time. The GP EIR found that the Gener al Plan Update would not conflict with the CARB Scoping Plan or the Southern California Association of Governments’ (SCAG) 2012 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS).
The proposed NLSP Update would further restrict the land uses from those analyzed in the GP EIR and establish additional development/design standards. The proposed NLSP Update would allow for increased intensity within the NLSP area compared to existing conditions; however, proposed density would be equal to or lower than limits analyzed under the GP EIR. Additionally, buildout of the NLSP Update would be within the General Plan buildout analyzed in the GP EIR. The NLSP improvements included in the proposed NLSP Update would create a district that supports a mix of housing and commercial development near transit and existing services to encourage walkability and transit usage, all supported by a public realm that invites residents, employees, and visitors to walk the district, with active streetscapes, open spaces, and rich landscaping that encourages public life and a sense of place. Buildout of the proposed NLSP Update would address the following goals and policies proposed by the General Plan Update for the City’s Land Use Element for North Lake: Goal 36, Policy LU 36.2: Provide for the development of a higher intensity mix of retail, office, and multi- family housing uses in proximity to the Metro A Line station that expand the customer base for local business and support Metro A Line ridership contributing to the reduction of vehicle trips, energy consumption, and GHG emissions; and Goal 36, Policy 36.5: Design Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Lake Avenue and Washington Boulevard as complete streets that accommodate transit, bicycle, and pedestrian use. Include wider sidewalks, public plazas, parks and parklets, bike lane, bicycle parking and wayfinding signage for pedestrians and bicyclists. Still, the GP EIR concluded that with buildout of the proposed General Plan Update, including buildout of the NLSP area, community-wide GHG emissions would not meet the long -term GHG reduction goal under Executive Order S -03-05. As such, new development under buildout of the proposed NLSP Update would be subject to the policies of the City’s current Climate Action Plan, which was adopted in 2018 to fulfill the requirements under GP EIR Mitigation Measure 5 -1, as well as additional climate action/GHG reduction plans established locally, state-wide, or federally at the time.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur, nor would the significant unavoidable impacts identified in the GP EIR be worsened. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
IX. HAZARDS AND HAZARDOUS MATERIALS
Would the project:
a) Create a significant hazard to
the public or the environment
through the routine transport,
use, or disposal of hazardous
materials?
LTS LTS No No No No
b) Create a significant hazard to
the public or the environment
through reasonably
foreseeable upset and
accident conditions involving
the release of hazardous
materials into the
environment?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
c) Emit hazardous emissions or
handle hazardous or acutely
hazardous materials,
substances, or waste within
one-quarter mile of an existing
or proposed school?
LTS LTS No No No No
d) Be located on a site that is
included on a list of hazardous
materials sites compiled
pursuant to Government Code
Section 65962.5 and, as a
result, would it create a
significant hazard to the public
or the environment?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
e) For a project located within an
airport land use plan or, where
such a plan has not been
adopted, within two miles of a
public airport or public use
airport, would the project
result in a safety hazard for
people residing or working in
the project area?
NI NI (IS) No No No No
f) For a project within the vicinity
of a private airstrip, would the
project result in a safety
hazard for people residing or
working in the project area?
LTS LTS (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
g) Impair implementation of or
physically interfere with an
adopted emergency response
plan or emergency evacuation
plan?
LTS LTS No No No No
h) Expose people or structures to
a significant risk of loss, injury
or death involving wildland
fires, including where
wildlands are adjacent to
urbanized areas or where
residences are intermixed with
wildlands?
LTS LTS No No No No
Discussion:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
The GP EIR found that buildout in accordance with the General Plan Update would involve the transport, use, and/or disposal of hazardous materials; however, impacts would be less than significant as construction would be short -term and in compliance with California Health and Safety Code, Occupational Safety and Health Administration (OSHA), and SCAQMD regulations; project operations would reduce industrial uses compared to existing conditions and new development would comply with the City’s Safe ty Element. The GP EIR found that 844 hazardous material sites fall within the City or within a 0.25 -mile radius thereof; however, compliance with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), California Code of Regulations, Title 22, and related requirements, as well as adherence to the City’s Land Use Element Policy LU 3.5 Hazardous Uses would bring the impact level to less than significant. The GP EIR concluded that project development could affect the implementation of an emergency response or evacuation plan due to population growth, development intensity, and road closures during construction; however, coordination with the Pasadena Fire Department (PFD) and compliance with the Los Angel es County Operational Area Emergency Response Plan and the City’s Emergency Operation Plan would ensure each project and buildout of the General Plan Update has a less than significant impact related to this topic. Finally, the GP EIR found that areas of the City near very high fire hazard severity zones could expose structures and/or residences to fire hazards during buildout of the General Plan Update. However, compliance with the International Fire Code, California Fire Code, and the City’s Safety El ement would ensure that future development under the General Plan Update would not expose people or structures to substantial wildfire hazards, and impacts would be less than significant. The IS prepared for the GP EIR found that no portion of the City is loca ted within Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
an airport land use plan or within two miles of an airport, and no related impact would occur. Furthermore, the IS prepared for the GP EIR concluded that the General Plan Update would not allow development of buildings with increased height that affect flight patterns or pose a safety hazard, and related impacts would be less than significant.
Similar to the buildout analyzed in the GP EIR, construction under the proposed NLSP Update could potentially involve the transport, use, and/or disposal of hazardous materials. However, the further regulation of land uses under the proposed NLSP Update would reduce industrial uses compared to existing conditions. Additionally, construction associated with individual development projects under buildout of the NLSP Update would be temporary in nature, and development would comply with the California Health and Safety Code, OSHA, and SCAQMD regulations. The NLSP Update is not expected to result in significant impacts related to the transport, use, and/or disposal of hazardous materials. The GP EIR did not list any hazardous material sites in the NLSP area; however, if a site were to be located with a 0.25 -mile radius of the NLSP area, future development would be required to comply with CERCLA, RCRA, California Code of Regulations, Title 22, and related requirements, as well as adhere to the City’s Land Use Element Policy LU 3.5: Haza rdous Uses. As a result, hazardous material-related impacts would be less than significant. Future development under buildout of the NLSP Update could result in temporary road closures. Similar to the GP Update analyzed in the GP EIR, future development under buildout of the NLSP Update would be required to coordinate with the PFD. Additionally, buildout of the NLSP Update would not interfere with the Los Angeles County Operational Area Emergency Response Plan or the City’s Emergency Operation Plan. Furthermore, no future Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
development project would be permitted to block any designated evacuation routes. Therefore, similar to the GP EIR, the NLSP Update is not expected to significantly affect the implementation of an emergency response or evacuation plan.
The current CEQA Guidelines Appendix G checklist also includes assessment criteria for potential impacts to wildfire for those areas located within or near a state responsibility area or on lands classified as Very High Fire Hazard Severity Zones. The propos ed NLSP Update is not located within a Very High Fire Hazard Severity Zone for local and state responsibility areas, and no impact would occur.10 No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
10 City of Pasadena. 2015 General Plan EIR. Figure 5.6-1, Fire Hazard Severity Zones.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
X. HYDROLOGY AND WATER QUALITY
Would the project:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
a) Violate any water quality
standards or waste discharge
requirements?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
b) Substantially deplete
groundwater supplies or
interfere substantially with
groundwater recharge such
that there would be a net
deficit in aquifer volume or a
lowering of the local
groundwater table level (e.g.,
the production rate of pre-
existing nearby wells would
drop to a level which would
not support existing land uses
or planned uses for which
permits have been granted)?
LTS LTS No No No No
c) Substantially alter the existing
drainage pattern of the site or LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
area, including through the
alteration of the course of
stream or river, in a manner,
which would result in
substantial erosion or siltation
on- or off-site?
d) Substantially alter the existing
drainage pattern of the site or
area, including through the
alteration of the course of
stream or river, substantially
increase the rate or amount of
surface runoff in a manner,
which would result in flooding
on- or offsite?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
e) Create or contribute runoff
water which would exceed the
capacity of existing or planned
stormwater drainage systems
or provide substantial
additional sources of polluted
runoff?
LTS LTS No No No No
f) Otherwise substantially
degrade water quality? LTS LTS No No No No
g) Place housing within a 100-
year flood hazard area as
mapped on a federal Flood
Hazard Boundary or Flood
Insurance Rate Map or dam
inundation area as shown in
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
the City of Pasadena adopted
Safety Element of the General
Plan or other flood or
inundation delineation map?
h) Place within a 100-year flood
hazard area structures, which
would impede or redirect flood
flows?
NI NI (IS) No No No No
i) Expose people or structures to
a significant risk of loss, injury
or death involving flooding,
including flooding as a result
of the failure of a levee or
dam?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
j) Inundation by seiche, tsunami,
or mudflow? LTS LTS No No No No
Discussion:
The GP EIR found that buildout of the General Plan Update could increase the amount of impervious surfaces in the City of Pasadena resulting in an increase in surface water flows into drainage systems within the watershed, potentially resulting in erosion, siltation, and/or flooding. However, the City is primarily developed and urbanized and development would be required to adhere to applicable local, state, and federal regulations and standards, as well as implement site design measures, low -impact development, and best management practices (BMPs), including infiltration features that contribute to groundwater recharge and minimize stormwater runoff, erosion, siltation, and/or flooding. As such, these impacts would be less than significant. The GP EIR stated that with the implementation of evacuation plans, as required by the City’s Safety Element, the impact to risk of loss, injury, or death in the case of dam failure less than significant. The GP EIR found that during the construction phases of projects developed under the General Plan Update, there is the potential for short-term unquantifiable increases in storm water pollutant concentrations; and during operation of such projects, the quality of storm runoff (sediment, nutrients, metals, pesticides, path ogens, and hydrocarbons) may be altered. Compliance with applicable local, state, and federal regulations would reduce water quality impacts associated with construction and operational impacts Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
related to stormwater pollution and water quality to less than significant levels. While the GP EIR found that portions of th e City are susceptible to inundation by mudflows, none of the proposed development under the General Plan Update fell within these susceptible areas, and the impact was found to be less than significant. The IS prepared for the GP EIR found that no portions of the Cit y of Pasadena are located within a 100-year floodplain and, therefore, no impact related to floodplains would occur.
The proposed NLSP Update would further restrict land uses from those analyzed in the NLSP area in the GP EIR and would establish additional development/design standards. The NLSP area is currently developed and urbanized. New development under the buildout of the proposed NLSP Update would be subject to applicable local, state, and federal regulations and standards pertaining to water quality, waste discharges, and hydraulic hazard risk reduction. Impacts to hydrology and water quality would be less than significant.
Furthermore, as indicated in the IS prepared for the GP, no portion of the City, including the NLSP area, is located within a 100 -year floodplain. Therefore, the proposed NLSP Update would not place structures within the flow of a 100 -year flood and no impact would occur.
The current CEQA Guidelines Appendix G checklist also recommends considering a project’s potential to conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan. As previously discussed, new development under the buildout of the proposed NLSP Update would be subject to applicable water quality regulations. Additionally, Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
no development in the NLSP area would include the extraction of groundwater. Therefore, the proposed NLSP Update would not conflict with the implementation of a water quality control plan or sustainable groundwater management plan, and the impact would be l ess than significant.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
XI. LAND USE AND PLANNING
Would the project:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
a) Physically divide an
established community? LTS LTS (IS) No No No No
b) Conflict with any applicable
land use plan, policy, or
regulation of an agency with
jurisdiction over the project
(including, but not limited to
the general plan, specific plan,
or zoning ordinance) adopted
for the purpose of avoiding or
mitigating an environmental
effect?
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
c) Conflict with any applicable
habitat conservation plan
(HCP) or natural community
conservation
plan (NCCP)?
NI NI (IS) No No No No
Discussion:
The IS prepared for the GP EIR found that land use changes proposed within the specific plan areas are intended to be integrated into the existing uses and surrounding neighborhoods. As such, the General Plan update would not physically divide an existing community and the impact would be less than significant. The GP EIR compared the General Plan Update’s proposed land use changes - including proposed net increases in development and new policies pertaining to building intensity and urban design - to existing land uses in the City and concluded that possible direct impacts to land use and planning would be less than significant. As found by the GP EIR and in accordance with California Government Code Section 65302, the General Plan Update would address two of the seven required Elements: Land Use and Mobility. The GP EIR also found that the General Plan Update would be consistent with the SCAG RTP/SCS, as required
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
It was concluded that implementation of the General Plan Update would result in a net increase of 12,312 additional residenti al dwelling units and 10,988,959 square feet of nonresidential uses; this net increase would be framed and regulated by the goal s and policies of the City’s Land Use and Mobility Elements, which support growth through 2035. Changes to prior land use designations proposed by the General Plan Update primarily allow ed for more mixed-use and redevelopment of existing industrial uses for more integrated non-residential land uses that would foster local goods and services and business in the City. Buildout capacity would be limited by the following standards for density (du/ac) and Floor Area Ratio (FAR): commercial uses with FARs between 0.0 and 3.0; Research and Development designations (which would replace Industrial designation) with FARs of 0 .9 and 0.0 -1.25, respectively; Low Mixed Use (0.0–1.0 FAR, 0–32 du/ac), Low Medium Mixed Use (0.0– 1.75 FAR, 0–48 du/ac), Medium Mixed Use (0.0–2.25 FAR, 0–87 du/ac), and High Mixed Use (0.0–3.0 FAR, 0–87 du/ac).
The GP EIR concluded that modifying land use designations and the corresponding buildout would create a positive live/work environment, which would enhance quality of life while reducing environmental impacts related to consumption, pollution, and emissions due to transit orientation, reduced commutes, and improved multi-modal options. Moreover, the GP EIR found that additional goals and policies added to the Land Use and Mobility Elements by the General Plan Update would ensure new development would be compatible with the existing character of the City while enhancing urban design and regulating sustainable growth. The GP EIR Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
stated that in addition to the goals and policies of the Land Use and Mobility Elements, new development would also be requir ed to comply with Title 17 of the City’s Municipal Code and applicable design guidelines.
The GP EIR stated that additional environmental impacts from changes to land use patterns and building intensity and design, such as impacts to air quality, hazards, flooding, and traffic, would be addressed individually in each corresponding section. As such, the GP EIR found that the proposed updates would not conflict with any existing applicable policies or regulations and would be implemented in such a way that creates compatibility within the plan area; impacts to land use and planning were determined to be less than significant in the GP EIR. Additionally, the IS prepared for the GP EIR found that there are no adopted habitat conservation or natural community conservation plans within the City and, as such, concluded that no impacts to such plans would result fr om the General Plan Update.
The proposed NLSP Update would have similar land use objectives as the GP EIR and includes further regulations around land uses and establishment of additional development/design standards to reflect development patterns within the NLSP area that have occurred since adoption of the General Plan Update. Similar to the General Plan Update, the NLSP Update is intended to be integrated into the existing uses and surrounding neighborhoods and would not physically divide an established community. The NLSP proposes six zoning districts that would allow for the creation of a vibrant and visually cohesive corridor, weaving together several distinct Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
pedestrian-oriented districts that complement and build upon the cultural and architectural history of the community and surrounding neighborhoods. The City’s General Plan Land Use Element designates a range of intensities and densities in the NLSP area to support the vision of a series of pedestrian-oriented villages and districts with unique identities, bolstered by their vibrant mix of uses, amenities, and streetscapes.
The Specific Plan generally implements the allowed density ranges and intensity set by the General Plan Land Use Diagram and regulates density within the maximum density studied by the General Plan EIR, with some residential capacity moved within the Plan area towards high-quality transit of the Metro A Line. The additional development/design standards would further the goals set forth in the Land Use and Mobility Elements as well as the objectives presented in the GP EIR ; additionally, b uildout of the NLSP Update would be within the General Plan buildout analyzed in the GP EIR . The NLSP Update would not conflict with Title 17 of the City’s Municipal Code, California Government Code Section 65302, or SCAG’s RTP/SCS. Furthermore, as indicated in the IS prepared for the GP EIR, there are no adopted habitat conservation or natural community conservation plans within the City. Therefore, the proposed NLSP would not result in impacts to any such plans.
As discussed in Chapter 2, Project Description, the NLSP Update defines these current uses and future development of these new land use types would occur in compliance with policies and regulations set forth under the updated NLSP, once adopted, and the Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Pasadena Municipal Code. Additionally, the Zoning Code would be amended to incorporate a new NLSP ordinance to regulate zoning consistent with the General Plan, replacing the existing Pasadena Municipal Code Chapter 17.3 4. Furthermore, as previously discussed, buildout of the NLSP Update would be within the General Plan buildout analyzed in the GP EIR . Therefore, the updated NLSP boundary and the four new land use types proposed under the NLSP Update would not result in significant land use and planning impacts.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
XII. MINERAL RESOURCES
Would the project:
a) Result in the loss of
availability of a known mineral
resource that would be of
value to the region and the
residents of the state?
NI NI (IS) No No No No
b) Result in the loss of
availability of a locally-
important mineral resource
recovery site delineated on a
local general plan, specific
plan or other land use plan?
NI NI (IS) No No No No
Discussion:
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Mineral resources were addressed in the IS prepared for the GP EIR , which concluded that there would be no impact to mineral resources following implementation of the General Plan Update.11 The IS states that there is no active mining in the City. Based on the California Geological Survey and as stated in the IS, the Eaton Wash and Arroyo Seco Wash are classified as Mineral Resource Sectors and may contain mineral resources within the City, but neither contain active mines or reserves, and buildout of the General Plan Update would not result in development in either area. Additionally, there are no mineral resource recovery sites in the City . As the proposed NLSP Update would occur within the same boundaries as those analyzed in the GP EIR and it is not located within any of the identified Mineral Resource Sectors, the proposed NLSP area would not contain mineral resources or develop on Mineral Resource Sectors.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the p roposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
11 City of Pasadena, Initial Study/Notice of Preparation, 2013.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
XIII. NOISE
Would the project result in:
a) Exposure of persons to or
generation of noise levels in
excess of standards
established in the local
general plan or noise
ordinance, or applicable
standards of other agencies?
LTS LTS No No No No
b) Exposure of persons to or
generation of excessive
groundborne vibration or
groundborne noise levels?
S-U S-U No No No No
c) A substantial permanent
increase in ambient noise LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
levels in the project vicinity
above levels existing without
the project?
d) A substantial temporary or
periodic increase in ambient
noise levels in the project
vicinity above levels existing
without the project?
S-U S-U No No No No
e) For a project located within an
airport land use plan or, where
such a plan has not been
adopted, within two miles of a
public airport or public use
airport, would the project
expose people residing or
NI NI (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
working in the project area to
excessive noise levels?
f) For a project within the vicinity
of a private airstrip, would the
project expose people
residing or working in the
project area to excessive
noise levels?
LTS LTS (IS) No No No No
Discussion:
The GP EIR analyzed impacts to noise from construction and operation of buildout of the General Plan Update, including statio nary noise, traffic noise, rail noise, industrial noise, and affiliated levels of vibration. The GP EIR assessed the updates for compatibility with the City’s Land Use and Noise Elements. The GP EIR concluded that increased stationary and traffic noises from buildout would have a less than significant impact; if residential and sensitive land uses continue to be developed in compatible areas, and those uses that Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
are compatible with transportation noises are developed in compliance with the Noise and Land Use Elements, as well as other state and local regulations pertaining to noise, then this impact would be less than significant as well.
Regarding exposure to long-term groundborne vibration, the GP EIR found that both rail and industrial uses could cause a potentially significant impact. Portions of the City are designated for and operated as industrial uses. Mitigation Measure 9-1 requires all industrial projects to submit a vibration study providing evidence that vibration -causing activity would not exceed levels set forth by the Federal Transit Administration (FTA). The City of Pasadena is served by the Metro A Line. The portion of this line in the City runs north -south parallel to Arroyo Parkway and then turns to an east-west orientation along I-210, with its current terminus in the City of Azusa. Mitigation Measure 9-2 requires all new development within screening distance of the Metro A Line to submit a study conducted by an acoustic engineer to the City’s Planning Division that identifies vibration impacts and possible reduction measures, if needed. Implementation of Mitigation Measures 9-1 and 9-2 would reduce groundborne vibration impacts to a less than significant level.
The GP EIR concluded that short -term impacts from construction vibration would be significant and unavoidable for buildout of the General Plan Update; Mitigation Measure 9-3 would reduce impacts to sensitive receptors within 25 feet of activity by substituting less intensive equipment when possible and utilizing vibration reduction techniques; however, because each new development involved in the buildout is project-specific, the GP EIR determined it is not possible to mitigate this impact below a significant and unavoidable level.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Mitigation Measure 9-4 further addresses vibrations from construction on sensitive architectural structures within 25 feet of activity; yet, similar to construction vibration impacts to sensitive receptors, this impact would remain significant and unavoidable in the context of total buildout as each project would present individual circumstances.
Mitigation Measure 9-5 requires all construction permits to be issued only after submission of a plan for noise and vibration reducing BMPs for all development within 500 feet of a noise-sensitive receptor; nevertheless, the GP EIR concluded that this mitigation measure would not reduce the impacts of construction activities to a less than significant level as the phasing, location, and magnitude of future development under buildout is unknown. Therefore, the GP EIR concluded that construction related noise impacts are significant and unavoidable. The IS prepared for the GP EIR found that no portion of the City is located within an airport land use plan or w ithin two miles of an airport, and no impact would occur. Furthermore, the IS prepared for the GP EIR concluded that noise from helicopter flights would be periodic and, thus, the impact resulting from noise from private use heliports would be less than significant.
Buildout of the proposed NLSP Update could have potentially significant noise impacts due to construction-related noise and vibration, as the phasing and location of future projects are currently unknown. However, similar to the updates analyzed under the GP EIR, the proposed NLSP Update would implement GP EIR Mitigation Measures 9-3 through 9-5 to ensure activity within the vicinity of sensitive land uses, receptors, and architectural structures is compliant with FTA criteria and that BMPs are utilized throughout the construction Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
phase of each future development project. As the proposed NLSP Update would not support the development of industrial uses within the NLSP area, the proposed NLSP Update would not create impacts to vibration from this use. The proposed NLSP area is adjacent to the Metro A Line and therefore would be subject to noise and vibration levels from rail use. As such, the proposed NLSP Update would implement GP EIR Mitigation Measures 9 -2 to assess vibration impacts from rail use and implement reduction measures. As indicated in the IS prepared for the GP, there are no airports within two miles of the City. Therefore, the proposed NLSP Update would not result in noise impacts related to an airport land use plan or public airport. Furthermore, similar to the General Plan Update, helicopter flights within the NLSP area would be periodic and, as the proposed NLSP Update would have no effect on helicopter usage or flight patterns, it would cause no new helicopter noise impacts.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur, nor would the significant unavoidable impacts identified in the GP EIR be worsened. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
XIV. POPULATION AND HOUSING
Would the project:
a) Induce substantial unplanned
population growth in an area,
either directly (for example, by
proposing new homes and
businesses) or indirectly (for
example, through extension of
roads or other infrastructure)?
LTS LTS No No No No
b) Displace substantial numbers
of existing housing,
necessitating the construction
of replacement housing
elsewhere?
LTS LTS (IS) No No No No
c) Displace substantial numbers
of people, necessitating the LTS LTS (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
construction of replacement
housing elsewhere?
Discussion:
The GP EIR concluded that, while population, housing, and employment growth induced by buildout of the General Plan update would likely surpass SCAG’s forecast, the impact of buildout would be less than significant. The General Plan Update accommodates growth in all sectors; it permits new housing opportunities and it opens more opportunities for employment. The GP EIR found that th e City- wide utilities and infrastructure required to service the projected buildout population would be sufficient, and each service is discussed in more detail within its individual section of this document ( i.e., Hydrology and Water Quality, Public Services, Transportation and Traffic, Utilities and Service Systems). One of the central objectives of the General Plan Update is to create a housing/job balance within a more work/live environment; the GP EIR found that buildout would achieve this goal, which would offset the detrimental impacts that growth would have. The IS prepared for the GP EIR found that the General Plan Update would increase the number of dwelling units by allowing higher intensity residential uses and mixed -use development and that growth in accordance with the proposed General Plan Update was not expected to displace existing housing or people, as the General Plan Update would increase the number Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
of dwelling units by allowing higher intensity residential uses and mixed-use development. Therefore, the IS concluded that the impacts related to displacement of housing and people would be less than significant.
The NLSP area previously analyzed by the GP EIR shares the same objective of creating a more balanced housing/job ratio. Since the GP EIR was certified, changes in development patterns within the NLSP have resulted in more opportunities for multifamily residential uses and mixed-use development, further achieving this goal. The NLSP area is primarily built out under existing conditions and buildout of the proposed NLSP Update would not exceed the projected growth analyzed in the GP EIR. Additionally, buildout of the NLSP Update would be within the General Plan buildout analyzed in the GP EIR , with some residential capacity transferred to a new mixed-use area that is currently a commercial-only zoning district. Therefore, similar to the GP EIR, the NLSP Update would not displace substantial numbers of housing or people, and the impacts would be less than significant.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
XV. PUBLIC SERVICES
Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
a) Fire protection? LTS LTS No No No No
b) Police Protection? LTS LTS No No No No
c) Schools? LTS LTS No No No No
d) Libraries? LTS LTS No No No No
Discussion:
The General Plan Update area is within the City of Pasadena and is serviced by the Pasadena Fire Department ( PFD), Pasadena Police Department (PPD), Pasadena Unified School District (PUSD), and the Pasadena Public Library (PPL).
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
The PFD operates eight stations throughout the City, with an average daily staff of 51. The GP EIR found that, while population growth and increased infrastructure from buildout of the General Plan Update would result in higher demand for service from the PFD and possibly require new or expanded facilities, compliance with existing regulations and coordination during road closures related to future construction would ensure impacts remain less than significant. The PPD aims to employ 1.63 officers per capita and 0.72 officers per 1,000 residents.
The GP EIR found that, while population growth and increased infrastructure from buildout of the General Plan Update would result in higher demand for service from the PPD and possibly require new or expanded facilities, compliance with existing regulation s would ensure impacts remain less than significant. The GP EIR concluded that while population growth from buildout of the General Plan Update would create new students in the population, the majority of which would be concentrated in three specific plan areas including the NLSP area, it is unlikely that forecasted growth would exceed the capacity of existing facilities; additionally, per SB 50, all new development in the City is subject to a School Impact Fee to ensure that school services continue to meet the needs of the population.
The PPL operates 10 facilities, all within 1 mile or walking distance of each residence. The GP EIR found that while buildout of the General Plan update would induce population growth, the estimated growth would not exceed the PPL’s capacity to serve the Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
community; additionally, all new development is subject to fees and taxes that fund public services, including a Library Special Tax, to ensure continued funding for the PPL. The GP EIR concluded that all impacts to public services would be less than significant.
The proposed NLSP Update would further restrict land uses from those analyzed in the GP EIR and establish additional development/design standards. The NLSP area is primarily built out under existing conditions and buildout of the proposed NLSP Update would not exceed the projected growth analyzed in the GP EIR. Additionally, buildout of the NLSP Update would be within the General Plan buildout analyzed in the GP EIR. Therefore, the proposed NLSP Update is not anticipated to increase demand for public services beyond the level analyzed in the GP EIR, and impacts would be less than significant.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
XVI. RECREATION
Would the project:
a) Would the project result in a
substantial adverse physical
impact associated with the
provisions of new or physically
altered governmental facilities,
need for new or physically
altered governmental facilities,
the construction of which
could cause significant
environmental impacts, in
order to maintain acceptable
service ratios, response times
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
or other performance
objectives for parks?
b) Would the project increase the
use of existing neighborhood
and regional parks or other
recreational facilities such that
substantial physical
deterioration of the facility
would occur or be
accelerated?
LTS LTS No No No No
c) Does the project include
recreational facilities or
require the construction or
expansion of recreational
facilities, which might have an
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
adverse physical effect on the
environment?
Discussion:
The City’s Municipal Code does not dictate a resident/acreage ratio for parkland and open space. While buildout of the General Plan Update would induce population growth and likely increase demand for parkland and open space and potentially result in the deterioration of existing facilities, the GP EIR found that improvements to existing and development of new open space and recreation amenities included in buildout, in conjunction with the Residential Impact Fee that each new development would be subject to as well as other in-lieu fees, impacts would be less than significant. The GP EIR concluded that the increase in population projected by buildout of the General Plan Update would increase demand for parkland, open space, and recreational facilities; increased use could deteriorate existing facilities or require the development of additional facilities. The GP EIR found that land uses permitting parkland, open space, and recreational activities would not be converted and that there would be opportunities for additional facilities to be built.
All residential development under the buildout of the GP would be required to pay a Residential Impact Fee; any type of project that acquires open space would also be subject to in -lieu fees. As such, the GP EIR found that impacts to recreation would be less than significant with adherence to existing regulations, including payment of applicable fees.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
The proposed updates to the NLSP would include open space requirements that would support high quality, accessible and usable open space across a variety of types that contribute to an active public realm. Residential open space would be required according to the number of bedrooms, resulting in units with more bedrooms having a larger open space requirement. Similar to future development projects under the GP EIR, new development under the proposed NLSP Update would comply with the City’s Municipal Code, Residential Impact Fees, and any other in-lieu and/or acquisition fees to ensure a less than significant impact to parks and recreation.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
XVII. TRANSPORTATION/TRAFFIC
Would the project:
a) Conflict with an applicable
plan, ordinance or policy
establishing measures of
effectiveness for the
performance of the circulation
system, taking into account all
modes of transportation
including mass transit and
non-motorized travel and
relevant components of the
circulation system, including
but not limited to intersections,
streets, highways and
freeways, pedestrian and
LTS-M(GP) LTS-M No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
bicycle paths, and mass
transit?
b) Conflict with an applicable
congestion management
program, including, but not
limited to level of service
standards and travel demand
measures, or other standards
established by the county
congestion management
agency for designated roads
or highways?
LTS S-U No No No No
c) Result in a change in air traffic
patterns, including either an
increase in traffic levels or a
NI NI (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
change in location that results
in substantial safety risks?
d) Substantially increase
hazards due to a design
feature (e.g., sharp curves or
dangerous intersections) or
incompatible uses (e.g., farm
equipment)?
LTS LTS No No No No
e) Result in inadequate
emergency access? LTS LTS No No No No
f) Conflict with adopted policies,
plans, or programs regarding
public transit, bicycle, or
pedestrian facilities, or
otherwise decrease the
LTS-M(GP) LTS-M No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
performance or safety of such
facilities?
Discussion:
The GP EIR analyzed the General Plan Updates for impacts to traffic and transportation based on calculations for vehicle miles traveled (VMT) per capita, vehicle trips (VT) per capita, proximity and quality of bicycle networks, proximity and quality of transit networks, and pedestrian accessibility, as well as compatibility with the City’s Mobility Element. The GP EIR concluded that implementation of the General Plan Update would not conflict with the City’s plans, ordinances, or policies establishing measu res of effectiveness for the performance of the complete circulation system, and complies with adopted policies, plans, and programs for alternative transportation.
It found that transportation performance would improve, and pedestrian and bicycle accessib ility would increase from buildout of the General Plan Update, which would satisfy Mobility Plan goals around livability, non-motorized transit, and economic viability. The GP EIR stated that all improvements within the City are funded through the City’s transportation fee program with the exception of bicycle and pedestrian improvements. The proposed General Plan Update included Policy 2 .10, requiring the City to amend the existing transportation impact fee to include pedestrian and bicycle improvements.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
The GP EIR concluded that without full funding of circulation improvements, the General Plan Update would result in a signifi cant impact. As such, Mitigation Measure 13-1 was identified in the GP EIR, which required the City to update the transportation impact fee program in place at the time the GP EIR was prepared by 2020 to ensure that impacts to traffic and transportation resulting from buildout of the General Plan Update remain less than significant . The City implemented Mitigation Measure 13 -1 and upd ated the transportation impact free program, as mandated by AB 1600 legislation, as codified by California Code Government Section 66000 et seq. The GP EIR found that buildout traffic conditions would result in designated road and/or highways exceeding county congestion management program thresholds, resulting in a significant project impact at the intersection of Pasadena Avenue at California Boulevard during the AM peak hour; impacts at all other intersections under Metro’s Congestion Management Program (CMP) would be less than significant. The GP EIR also identified significant impacts at two CMP Freeway Mainline Segments on Route 210.
However, these intersections and CMP Freeway Mainline Segments on Route 210 are not within the NLSP Update area.
The GP EIR also concluded that there was no feasible mitigation to reduce CMP impacts to a less than significant level, as improvements to road capacity would require changes to road infrastructure, which would have secondary impacts such as loss o f bicycle lanes, parking, sidewalk space, etc. that would conflict with General Plan goals and policies and would cause other impacts to traffic and transportation. As such, this impact was determined to be significant and unavoidable. Finally, the GP EIR found that under buildout, project circulation improvements would be designed to adequately address potentially hazardous conditions (sharp cu rves, Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
etc.), potential conflicting uses, and emergency access. The IS prepared for the GP EIR found that no portion of the City is located within an airport land use plan or within two miles of an airport. As such, the General Plan Update would not affect air tr affic patterns and no impact would occur.
Roadways and mobility within the proposed NLSP area were analyzed within the GP EIR; the proposed NLSP Update does not include modifications to roadways and infrastructure outside of the project area analyzed in the GP EIR. While the modifications within the proposed NLSP would permit more residential units and uses, thus accommodating population growth, like the GP EIR concluded, the circulation improvements to which the proposed NLSP would contribute – improved sidewalk zones, bicycle and pedestrian accessibility, parking, proximity to live/work/shop for residents, allowing more residential and mixed use development in close proximity to the Metro A Line station – would be beneficial for the community and City as a whole. Further, per GP EIR Mitigation Measure 13- 1, each project developed under buildout of the proposed NLSP Update would be subject to whatever transportation impact fee is in effect at the time of permitting, thus ensuring that funds for future improvements would be available.
Additionally, the proposed NLSP Update would support the Department of Transportation’s Bicycle Transportation Action Plan by reinforcing pedestrian-friendly design and development and requiring bicycle parking. As such, and considering the availability of transit, bicycle, and pedestrian facilities in the NLSP area, impacts from the NLSP Update related to proximity and quality of bicycle Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
networks, proximity and quality of transit networks, pedestrian accessibility, and mixed-uses in proximity to the Metro A Line would be less than significant. According to the GP EIR, t he proposed NLSP area does not include CMP intersections where traffic impacts would occur. Regardless, the Los Angeles County CMP has been dissolved. Additionally, as indicated in the IS prepared for the GP EIR, there are no airports within two miles of the City. Therefore, the proposed NLSP Update would not affect air traffic patterns and no impact would occur.
The current CEQA Guidelines Appendix G checklist also recommends considering a project’s potential to conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b), which requires the use of VMT as the updated measurement of traffic impacts, replacing the level of service (LOS) method previously used. As discussed, the GP EIR included a City-wide VMT analysis for impacts to traffic and transportation based on calculations for VMT per capita and VT per capita. The analysis used the City of Pasadena Travel Demand Forecasting (TDF) Model, which was validated to 2013 traffic conditions and later updated to reflect 2017 conditions. Both the 2013 and 2017 models assumed that the I -710 extension would be constructed by 2035, which is no longer a valid assumption.
As such, an assessment was conducted to update the model to reflect the 2035 horizon year without the I -710 extension.12 This assessment concluded that there were no substantial deviations from the VMT and VT analyses with the removal of the I-710 from the
12 Pasadena Future Year TDF Model Update and New VMT/VT Metrics Memorandum, Fehr & Peers, October 2020.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
model. Thus, both versions of the Pasadena TDF Model are consistent with the changes to the CEQA metrics establishing VMT as the measurement of traffic impacts. Additionally, buildout of the NLSP Update would be within the General Plan buildout analyzed in the GP EIR. As such, the VMT analysis previously prepared for the GP EIR would also be applicable to the NLSP Update. Further, it should be noted that there is no development project identified under the proposed NLSP Update. Rather, future development projects would implement the land use and design modifications proposed in the NLSP Update. Future residential development projects consisting of 50 or more dwelling units and non -residential development projects greater than 50,000 square feet in size would be required to include a VMT assessment as part the environmental documentation prepared for that project. As such, the proposed NLSP Update would not conflict or be inconsistent with CEQA Guidelines Section 15064.3(b), and the impact would be less than significant.
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur, nor would the significant unavoidable impacts identified in the GP EIR be worsened. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
XVIII. UTILITIES AND SERVICE SYSTEMS
Would the project:
a) Exceed wastewater treatment
requirements of the applicable
Regional Water Quality
Control Board?
LTS LTS No No No No
b) Require or result in the
construction of new water or
wastewater treatment facilities
or expansion of existing
facilities, the construction of
which could cause significant
environmental effects?
LTS LTS No No No No
c) Require or result in the
construction of new storm LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
water drainage facilities or
expansion of existing facilities,
the construction of which
could cause significant
environmental effects?
d) Have sufficient water supplies
available to serve the project
from existing entitlements and
resources, or are new or
expanded entitlements
needed?
LTS LTS No No No No
e) Result in a determination by
the wastewater treatment
provider, which serves or may
serve the project that it has
LTS LTS No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
adequate capacity to serve
the project’s projected
demand in addition to the
provider’s existing
commitments?
f) Be served by a landfill with
sufficient permitted capacity to
accommodate the project’s
solid waste disposal needs?
LTS LTS No No No No
g) Comply with federal, state,
and local management and
reduction statutes and
regulations related to solid
waste?
NI NI (IS) No No No No
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
Discussion:
The GP EIR found that regarding wastewater treatment and collection, services provided by the Sanitation Districts of Los Ang eles County, Los Angeles County Public Works Department, and PWP would adequately manage wastewater generated by buildout of the General Plan Update. Upon implementation of regulatory requirements and standard conditions of approval, such as payment of development fees and implementation of a site-specific Storm Water Pollution Preventions Plan for construction, the impact would be less than significant. Regarding water supply and distribution, the GP EIR found that buildout of the General Plan Update wou ld fall within projections for PWP’s capacity; project requirements would be met by current services provided by PWP. Upon implementation of regulatory requirements and standard conditions of approval, such as implementation of mandatory conservation measures, requiring the preparation of a Water Supply Assessment for development projects meeting certain size criteria, and requiring affirmative verification of sufficient water supply for certain residential subdivisions pursuant to SB 221, the impact would be less than significant.
Regarding solid waste, the GP EIR found that project buildout would be accommodated by existing service p roviders and facilities.
Upon implementation of regulatory requirements and standard conditions of approval, such as the inclusion of storage areas for recyclable materials at future nonresidential and multifamily residential development projects pursuant to AB 341, recycling at least 50 Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
percent of construction and demolition waste pursuant to the California Green Building Code, and solid waste reduction strate gies under General Plan Policies 10.2 and 10.4, the impact would be less than significant.
Regarding other utilities, including electricity, natural gas, and communications, the GP EIR concluded that future development under the General Plan Update would be accommodated by existing service providers, and the impact would be less than significant. The GP EIR found that the project satisfied and complied with the City’s adopted General Plan Open Space and Conservation Element pertaining to water conservation, General Plan Safety Element pertaining to continued earthquake strengthening for utilities and protection of water supply, and state codes and regulations pertaining to utility services, and that the proposed updates to the General Plan Land Use Element regarding energy and water efficiency and conservation and solid waste reduction would create more sustainable standards for the future of the City. The IS prepared for the GP EIR found that buildout of the General Plan Update would be required to comply with all applicable solid waste regulations, including the California Integrated Waste Manage ment Act and the City of Pasadena Zoning Code Section 17.40.120 (Refuse Storage Facilities) and, as such, no impact related to compliance with solid waste regulations would occur.
The proposed NLSP area is within the area analyzed by the GP EIR , and the same service providers would manage utility services for future development projects under the proposed NLSP Update. The proposed NLSP Update would further restrict land uses from Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
those analyzed in the GP EIR and establish additional development/design standards. While there will be a shift in residential density towards the Metro A Line, t he NLSP area is primarily built out under existing conditions and buildout of the proposed NLSP Update would not exceed the projected growth analyzed in the GP EIR. Therefore, the proposed NLSP Update is not anticipated to exceed the capacity of existing utility facilities and no new or expanded facilities are anticipated to be needed to service build out of the NLSP.
Similar to the General Plan Update, future projects implemented under the NLSP Update would be required to adhere to all applicable solid waste regulations. Therefore, implementation of the proposed NLSP Update would have no impact related to compliance with solid waste regulations.
The current CEQA Guidelines Appendix G checklist also includes assessment criteria for potential impacts related to the relocation or construction of new or expanded electric power, natural gas, or telecommunications facilities. Similar to water, wastewater, and solid waste facilities, existing service providers would manage electricity, natural gas, and telecommunications services for projects under the proposed NLSP Update. As discussed, the NLSP area is primarily built out under existing conditions. Thus , it is anticipated that any new development in the NLSP area would require lateral connections to mainlines in coordination with utility service providers, similar to what occurs under existing conditions. Therefore, the NLSP Update would result in less than significant impacts related to the relocation or construction of new or expanded electric power, natural gas, and telecommunications facilities.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Issues and Supporting Data
Sources:
NLSP
Update
Impact
Conclusion
GP EIR
Impact
Conclusion
Does the
NLSP Update
Involve New
Significant
Impacts or
Substantially
More Severe
Impacts than
those
analyzed in
the GP EIR?
Any New or
Changed
Circumstances
Involving New
Significant
Impacts or
Substantially
More Severe
Impacts than
those analyzed
in the GP EIR?
Any New
Information
of
Substantial
Importance
That Was
Not and
Could Not
Have Been
Known at the
Time of
Certification
of the GP
EIR that
Rises to the
Level of
Requiring
New
Analysis or
Verification?
Are Any
New
Mitigation
Measures
Required
for the
NLSP
Update?
No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The project does not propose substantial changes that require major revisions to the GP EIR, and no new mitigation measures are required.
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Page Intentionally Left Blank
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Environmental Determination
Based upon the evidence in light of the whole record documented in the attached environmental checklist explanation, cited incorporations and attachments, I find that the Project:
Has previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. The proposed project is a component of the whole action analyzed in the previously adopted/certified CEQA document.
Has previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. Changes and additions to the earlier CEQA document are needed to make the previous documentation adequate to cover the project which are documented in this Addendum (CEQA Guidelines §15164).
However, none of the conditions described in CEQA Guidelines Section 15162 that would require the preparation of a subsequent EIR have occurred.
Has previously been analyzed as part of an earlier CEQA document (which either mitigated the project or adopted impacts pursuant to findings) adopted/certified pursuant to State and City CEQA Guidelines. However, there is important new information and/or substantial changes have occurred requiring the preparation of an additional CEQA document (N egative Declaration or EIR) pursuant to CEQA Guidelines Sections 15162 through 15163.
Prepared By Date Reviewed By Date
_______________________
Printed Name Printed Name
Addendum approved on: ______________________
Approval attested to by: _______________________ ________ Signature Date
_________________________________
Printed Name
Chapter 3: Evaluation of Environmental Impacts North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Page Intentionally Left Blank
Chapter 4: Mitigation Measures North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
CHAPTER 4
MITIGATION MEASURES
The mitigation measures listed below are from the Pasadena General Plan Final Environmental Impact Report and would be applicable to the proposed project. No new mitigation measures are required as a result of implementing the proposed project. The City, as the CEQA lead agency, is responsible for monitoring the implementation of the adopted mitigation measures.
Air Quality
2-1 Prior to issuance of any construction permits, development project applicants shall prepare and submit to the City of Pasadena Planning Division a technical assessment evaluating potential project construction -related air quality impacts. The evaluation shall be prepared in conformance with South Coast Air Quality Management District (SCAQMD) methodology for assessing air quality impacts. If construction -related criteria air pollut ants are determined to have the potential to exceed the SCAQMD - adopted thresholds of significance, the City of Pasadena Planning Division shall require that applicants for new development projects incorporate mitigation measures to reduce air pollutant emi ssions during construction activities. These identified measures shall be incorporated into all appropriate construction documents (e.g., construction management plans) submitted to the City and shall be verified by the City’s Planning Division. Mitigation measures to reduce construction -related emissions include, but are not limited to:
• Requiring fugitive-dust control measures that exceed SCAQMD’s Rule 403, such as:
• Use of nontoxic soil stabilizers to reduce wind erosion. • Applying water every four hours to active soil-disturbing activities. • Tarping and/or maintaining a minimum of 24 inches of freeboard on trucks hauling dirt, sand, soil, or other loose materials.
• Using construction equipment rated by the United States Environmental Protection Agency as having Tier 3 (model year 2006 or newer) or Tier 4 (model year 2008 or newer) emission limits, applicable for engines between 50 and 750 horsepower. • Ensuring that construction equipment is properly serviced and maintained to the manufacturer’s standards.
• Limiting nonessential idling of construction equipment to no more than five consecutive minutes.
• Using Super -Compliant volatile organic compound ( VOC) paints for coating of architectural surfaces whenever possible. A list of Super -Compliant architectural coating manufactures can be found on the SCAQMD’s website at http://www.aqmd.gov/prdas/brochures/Super-Compliant_AIM.pdf.
Chapter 4: Mitigation Measures North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
2-2 Prior to future discretionary project approval, development project applicants shall prepare and submit to the City of Pasadena Planning Division a technical assessment evaluating potential project operation phase-related air quality impacts. The evaluation shall be prepared in conformance with SCAQMD methodology in assessing air quality impacts. If operation -related air pollutants are determined to have the potential to exceed the SCAQMD -adopted thresholds of significance, the City of Pasadena Planning Division shall require that applicants for new development projects incorporate mitigation measures to reduce air pollutant emissions during operational activities. The identified measures shall be included as part of the Standard Conditions of Approval. Below are possible mitigation measures to reduce long-term emissions:
• For site-specific development that requires refrigerated vehicles, the construction documents shall demonstrate an adequate number of electrical service connections at loading docks for plug-in of the anticipated number of refrigerated trailers to reduce idling time and emissions.
• Applicants for manufacturing and light industrial uses shall consider energy storage and combined heat and power in appropriate applications to optimize renewable energy generation systems and avoid peak energy use. • Site-specific developments with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with California Air Resources Board Rule 2845 (13 California Code of Regulations Chapter 10 § 2485).
• Site-specific development shall demonstrate that an adequate number of electrical vehicle Level 2 charging stations are provided onsite. The location of the electrical outlets shall be specified on building plans, and proper installation shall be verified by the Building Division prior to issuance of a Certificate of Occupancy. • Applicant-provided appliances shall be Energy Star appliances (e.g., dishwashers, refrigerators, clothes washers, and dryers). Installation of Energy Star appliances shall be verified by the Building & Safety Division during plan check. • Applicants for future development projects along existing and planned transit routes shall coordinate with the City of Pasadena, Metro, and Foothill Transit to ensure that bus pads and shelters are incorporated, as appropriate.
2-3 Prior to future discretionary project approval, applicants for new industrial or warehousing land uses that 1) have the potential to generate 100 or more diesel truck trips per day or have 40 or more trucks with operating diesel -powered transport refrigeration units, and 2) are within 1,000 feet of a sensitive land use (e.g., residential, schools, hospitals, or nursing homes), as measured from the property line of the project to the property line of the nearest sensitive use, shall submit a health risk assessment (HRA) to the City of Pasadena Planning Division. The HRA shall be prepared in accordance with policies and procedures of the state Office of Environmental Health Hazard Assessment and the South Coast Air Quality Management District. If the HRA s hows that the incremental cancer risk and/or noncancer hazard index exceeds the respective thresholds, as established by the SCAQMD at the time a project is considered, the applicant will be required to identify and demonstrate that best available control technologies for toxics (T -BACTs), including appropriate enforcement mechanisms, are capable of reducing potential cancer and noncancer risks to an acceptable level. T-BACTs may include, but are not Chapter 4: Mitigation Measures North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
limited to, restricting idling onsite or electrifying warehousing docks to reduce diesel particulate matter, or requiring use of newer equipment and/or vehicles. T -BACTs identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site plan.
2-4 Prior to future discretionary approval, the City of Pasadena Planning Division shall evaluate new development proposals for sensitive land uses (e.g., residences, schools, and day care centers) within the City for potential incompatibilities with regard to the California Air Resources Board’s Air Quality and Land Use Handbook: A Community Health Perspective (April 2005). In addition, applicants for siting or expanding sensitive land uses that are within the recommended buffer distances listed in Table 1-1 of the California Air Resources Board ( CARB) Handbook shall submit a HRA to the City of Pasadena. The HRA shall be prepared in accordance with policies and procedures of the state Office of Environmental Health Hazard Assessment (OEHHA) and the SCAQMD. The latest OEHHA guidelines shall be used for t he analysis, including age sensitivity factors, breathing rates, and body weights appropriate for children. If the HRA shows that the incremental cancer risk and/or noncancer hazard index exceeds the respectiv e thresholds, as established by the SCAQMD at the time a project is considered, the applicant will be required to identify and demonstrate that mitigation measures are capable of reducing potential cancer and noncancer risks to an acceptable level (i.e., below the aforementioned thresholds as established by the SCAQMD), including appropriate enforcement mechanisms.
Measures to reduce risk may include but are not limited to:
• Air intakes oriented away from high-volume roadways and/or truck loading zones. • Heating, ventilation, and air conditioning systems of the buildings provided with appropriately sized maximum efficiency rating value (MERV) filters. • Heating, ventilation, and air conditioning systems for units that are installed with MERV filters shall maintain positive pressure within the building’s filtered ventilation system to reduce infiltration of unfiltered outdoor air.
Mitigation measures identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site development plan as a component of the proposed project. The air intake design and MERV filter requirements shall be noted and/or reflected on all building plans submitted to the City and shall be verified by the City’s Planning Division. The intent of this mitigation measure is to reflect current CARB and SCAQMD Guidance/Standards as well as CEQA legislation a nd case law, and the City implementation of the measure shall adhere to current standards/law at the time such analyses are undertaken.
2-5 Prior to future discretionary approval, if it is determined that a project has the potential to emit nuisance odors beyond the property line, an odor management plan shall be prepared by the project applicant, subject to review and approval by the Planning & Community Development Director or their designee. Facilities that have the potential to generate nuisance odors include but are not limited to:
• Wastewater treatment plants
• Composting, green waste, or recycling facilities
• Fiberglass manufacturing facilities
• Painting/coating operations
Chapter 4: Mitigation Measures North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
• Large-capacity coffee roasters
• Food-processing facilities
The odor management plan shall show compliance with the South Coast Air Quality Management District’s Rule 402 for nuisance odors. The Odor Management Plan shall identify the T-BACTs that will be utilized to reduce potential odors to acceptable levels, including appropriate enforcement mechanisms. T -BACTs may include but are not limited to scrubbers (i.e., air pollution control devices) at the industrial facility. T-BACTs identified in the odor management plan shall be identified as mitigation measures in the environmental document and/or incorporated into the site plan.
Biological Resources
3-1 The City of Pasadena shall require applicants of future development projects that disturb undeveloped land in the San Rafael Hills and tract of land at the northwest intersection of Crestford Drive and Florecita Drive, to prepare a biological resources survey. The survey shall be conducted by a qualified biologist and shall be a reconnaissance level field survey of the project site for the presence and quality of biological resources potentially affected by project development. These resources include, but are not limited to, special status species or their habitat, sensitive habitats such as wetlands or riparian areas, and jurisdictional waters. If sensitive or protected biological resources are absent from the project site and adjacent lands potentiall y affected by the project, the biologist shall submit a written report substantiating such to the City of Pasadena before issuance of a grading permit by the City, and the project may proceed without any further biological investigation. If sensitive or pr otected biological resources are present on the project site or may be potentially affected by the project, implementation of Mitigation Measure 3-2 shall be required.
3-2 A qualified biologist shall evaluate impacts to sensitive or protected biological resources from development. The impact assessment may require focused surveys that determine absence or presence and distribution of biological resources on the site. These surveys may include but are not limited to: 1) focused special status animal surveys if suitable habitat is present; 2) appropriately timed focused special status plant surveys that will maximize detection and accurate identification of target plant species; and 3) a delineation of jurisdictional boundaries around potential wetlands, riparian habitat, and waters of the United States or State. The results of these surveys will assist in assessing actual project impacts, and with the development of project - specific mitigation measures. Alternatively, the project applicant may forgo focused plant and animal surveys and assume presence of special status species in all suitable habitats on the project site. The qualified biologist shall substantiate the impact evaluation or the assumed presence of special -status species in all suitable habitats onsite in a written report submitted to the City of Pasadena before issuance of a grading permit by the City.
3-3 The City of Pasadena shall require applicants of development project to avoid potential impacts to sensitive or protected biological resources to the greatest extent feasible.
Depending on the resources potentially present on the project site, avoidance m ay include: 1) establishing appropriate no-disturbance buffers around onsite or adjacent resources, and/or 2) initiating construction at a time when special status or protected animal species will not be vulnerable to project-related mortality (e.g., outside the avian nesting season or bat maternal or wintering roosting season). Consultation with Chapter 4: Mitigation Measures North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
relevant regulatory agencies may be required in order to establish suitable buffer areas. If the project avoids all sensitive or protected biological resources, no further action is required. If avoidance of all significant impacts to sensitive or protecte d biological resources is not feasible, the project shall implement Mitigation Measure 3-
4. 3-4 The City of Pasadena shall require applicants to design development projects to minimize potential impacts to sensitive or protected biological resources to the greatest extent feasible, in consultation with a qualified biologist and/or appropriate regulatory agency staff. Minimization measures may include 1) exclusion and/or silt fencing, 2) relocation of impacted resources, 3) construction monitoring by a qualified biologist, and 4) an informative training program conducted by a qualified biologist for construction personnel on sensitive biological resources that may be impacted by project construction. If minimization of all significant impacts to sensitive or protected biological resources is infeasible, the project shall implement Mitigation Measure 3-5.
3-5 A qualified biologist will develop appropriate mitigations that will reduce project impacts to sensitive or protected biological resources to a less than significant level, if feasible. The type and amount of mitigation will depend on the resources impact ed, the extent of the impacts, and the quality of habitats to be impacted. Mitigations may include, but are not limited to: 1) compensation for lost habitat or waters in the form of preservation or creation of in-kind habitat or waters, either onsite or offsite, protected by conservation easement; 2) purchase of appropriate credits from an approved mitigation bank servicing the Pasadena area; and 3) payment of in-lieu fees.
3-6 Applicants of projects developed pursuant to the General Plan Update shall obtain appropriate permit authorization(s) for impacts to jurisdictional waters, wetlands, and/or riparian habitats. The types of permits potentially required for impacts to jurisdictional waters are a Clean Water Act (Section 404) permit issued by the US Army Corps of Engineers, a California Water Certificate or Waste Discharge Order issued by the Regional Water Quality Control Board, and a Stream Alteration Agreement issued by the California Department of Fish and Wildlife.
Cultural Resources
4-1 If cultural resources are discovered during construction of land development projects in Pasadena that may be eligible for listing in the California Register for Historic Resources, all ground disturbing activities in the immediate vicinity of the find shall be halted until the find is evaluated by a Registered Professional Archaeologist. If testing determines that significance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates a s applicable, and other special studies; and provide a comprehensive final report including site record to the City and the South Central Coastal Information Center at California State University Fullerton. No further grading shall occur in the area of the discovery until Planning Department approves the report.
4-2 The City shall require applicants for development permits that involve grading in areas within the paleontologically sensitive Topanga formation to provide studies by a qualified paleontologist assessing the sensitivity of the project for buried paleontological resources. On properties determined to be moderately to highly sensitive for paleontological resources, such studies shall provide a detailed mitigation Chapter 4: Mitigation Measures North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
plan, including a monitoring program and recovery and/or in situ preservation plan, based on the recommendations of a qualified paleontologist. The mitigation plan shall include the following requirements:
• A paleontologist shall be retained for the project and will be on call during grading and other significant ground -disturbing activities more than six feet below the ground surface.
• Should any potentially significant fossil resources be discovered, no further grading shall occur in the area of the discovery until the Planning and Community Development Director concurs in writing that adequate provisions are in place to protect any significant resources. Work may continue outside a minimum radius of 25 feet from the discovery pending review by the Director. • Unanticipated discoveries shall be evaluated for significance by a qualified paleontologist. If evaluation determines that significance criteria are met, then the project shall be required to perform data recovery, professional identification, radiocarbon dates as applicable, and other special studies; and provide a comprehensive final report, including catalog with museum numbers.
Greenhouse Gas Emissions
5-1 Within approximately 18 months of adoption of the proposed General Plan Update, the City of Pasadena shall prepare and present to the City Council for adoption a community climate action plan/greenhouse gas reduction plan. The Plan shall identify strategies to be implemented to reduce GHG emissions associated with the City and shall include as one alternative a program that achieves the AB 32 targets. In addition, the City shall monitor GHG emissions by updating its community-wide GHG emissions inventory every five years upon adoption of the initial Plan. Upon the next update to the community climate action plan/greenhouse gas reduction plan, the inventory, GHG reduction measures, and GHG reductions shall be forecast to year 2035 to ensure progress toward achieving the interim target that aligns with the long -term GHG reduction goals of Executive Order S-03-04. The Plan update shall take into account the reductions achievable from federal and state actions and measures as well as ongoing work by the City and the private sector. The 2035 Plan update shall be completed by January 1, 2021, with a plan to achieve GHG reductions for 2035 or 2040, provided the state has an actual plan to achieve reductions for 2035 or 2040.
New reduction programs in similar sect ors as the proposed Plan (building energy, transportation, waste, water, wastewater, agriculture, and others) will likely be necessary. Future targets shall be considered in alignment with state reduction targets, to the maximum extent feasible, but it is premature at this time to determine whether or not such targets can be feasibly met through the combination of federal, state, and local action given technical, logistical and financial constraints. Future updates to the community climate action plan/greenhouse gas reduction plan shall account for the horizon beyond 2035 as the state adopts actual plans to meet post - 2035 targets. In all instances, the community climate action plan/greenhouse gas reduction plan and any updates shall be consistent with state and federal law.
Chapter 4: Mitigation Measures North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
Noise
9-1 Prior to issuance of building and occupancy permits, applicants of industrial projects that involve vibration-intensive machinery or activities adjacent to sensitive receptors shall prepare a study to evaluate potential vibration impacts. The study shall be prepared by an acoustical engineer and be submitted to the City of Pasadena Planning Division. The study shall evaluate the vibration levels associated with operation of project-related equipment and activities experienced by nearby sensitive receptors. If it is determined that vibration impacts to nearby receptors exceed the Federal Transit Administration (FTA) vibration -annoyance criterion, the study shall recommend and the applicant shall implement the identified measures with the purpose of reducing vibration impacts to a less than significant level. The City of Pasadena shall verify implementation of all identified measures.
9-2 Prior to issuance of building permits for the new construction of habitable area, applicants for development projects shall adhere to the appropriate Vibration Category 2 and Vibration Category 3 screening distances for light rail transit as recommended in Table 9-2 of FTA’s Transit Noise and Vibration Impact Assessment (FTA 2006) in evaluating vibration impacts related to trains on the Metro Gold Line. Applicants for development projects that fall within the screening distances shall prepare and submit to the City of Pasadena Planning Division a study evaluating vibration impacts to the proposed development from train operations. The study shall be prepared by an acoustical engineer who shall identify measures to reduce impacts to habitable structures to below the FTA vibration annoyance criterion. The identified measures shall be incorporated into all design plans submitted to the City of Pasadena.
9-3 Prior to issuance of any grading and construction permits, applicants for individual projects that involve vibration -intensive construction activities, such as pile drivers, jack hammers, and vibratory rollers, within 25 feet of sensitive receptors (e.g., residences and historic structures) shall prepare and submit to the City of Pasadena Planning Division a study to evaluate potential construction -related vibration impacts. The study shall be prepared by an acoustical engineer and shall identify measures to reduce impacts to habitable structures to below the FTA vibration annoyance criterion. If construction-related vibration is determined to be perceptible at vibration-sensitive uses, additional requirements, such as use of less -vibration- intensive equ ipment or construction technique, shall be implemented during construction (e.g., drilled piles, static rollers, and nonexplosive rock blasting). Identified measures shall be included on all construction and building documents and submitted for verification to the City of Pasadena Planning Division.
9-4 Prior to issuance of any construction permits, applicants for individual projects that involve vibration-intensive construction activities, such as pile drivers, jack hammers, bulldozers, and vibratory rollers, within 25 feet of sensitive receptors (e.g., residences) or 50 feet of historic structures, shall prepare and submit to the City of Pasadena Planning Division a study to evaluate potential construction-related vibration impacts.
The vibration assessment shall be prepared by an acoustical engineer and be based on the FTA vibration-induced architectural damage criterion. If the study determines a potential exceedance of the FTA thresholds, measures shall be identified that ensure vibration levels are reduced to below the thresholds. Measures to redu ce vibration levels can include use of less -vibration-intensive equipment (e.g., drilled piles and static rollers) and/or construction techniques (e.g., nonexplosive rock blasting and use Chapter 4: Mitigation Measures North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
of hand tools) and preparation of a preconstruction survey report to assess the condition of the affected sensitive structure. Notwithstanding the above, pile drivers shall not be allowed within 150 feet of any historic structures. Identified measures shall be included on all construction and building documents and submitted for verification to the City of Pasadena Planning Division.
9-5 Prior to issuance of construction permits, applicants for new development projects within 500 feet of noise -sensitive receptors shall implement the following best management practices to reduce construction noise levels:
• Consider the installation of temporary sound barriers for construction activities immediately adjacent to occupied noise-sensitive structures. • Equip construction equipment with mufflers.
• Restrict haul routes and construction-related traffic. • Reduce nonessential idling of construction equipment to no more than five minutes.
The identified best management practices shall be noted on all site plans and/or construction management plans and submitted for verification to the City of Pasadena Planning Division.
Transportation and Traffic
13-1 The City of Pasadena shall update its existing transportation impact fee program by 2020. The City shall prepare a “Nexus” Study that will serve as the basis for requiring development impact fees under AB 1600 legislation, as codified by California Code Government Section 66000 et seq. The established procedures under AB 1600 require that a “reasonable relationship” or nexus exist between the traffic improvements and facilities required to mitigate the traffic impacts of new development pursuant to the proposed project. After approval of the Nexus Study, the City shall update the transportation impact fee program to fund all citywide circulation improvements, including the pedestrian and bicycle network. The fee program shall stipulate that fees are ass essed when there is new construction or when there is an increase in square footage within an existing building or the conversion of existing square footage to a more intensive use. Fees are calculated by multiplying the proposed square footage or dwelling unit by the rate identified. The fees are included with any other applicable fees payable at the time the building permit is issued. The City will use the development fees to fund construction (or to recoup fees advanced to fund construction).
Chapter 5: List of Preparers North Lake Specific Plan Update
Addendum to the Pasadena General Plan EIR September 2025
CHAPTER 5
LIST OF PREPARERS
LEAD AGENCY
The City of Pasadena
Planning & Community Development Department
175 N. Garfield Avenue
Pasadena, CA 91101
Anita Cerna, Principal Planner
David Sinclair, Senior Planner
PREPARED BY
AECOM Technical Services, Inc.
300 S. Grand Avenue, 9th Floor
Los Angeles, California 90071
Rod Jeung, Project Director
Susan Ambrosini, Principal Urban Planner
Lori Keller, Environmental Analyst
Mike Peterson, Urban Planner
Aryeh Cohen, Urban Planner
Jang Seo, GIS/Graphic Specialist