Based on these findings, approved the application for Concept Design Review subject to the conditions in Attachment A to be further reviewed during Final Design Review.
Effective Date Appeals Call for Review
You are hereby notified that any person affected or aggrieved by the decision of the Design Commission has the right to appeal this decision within ten days. The regular appeal fee is $5,287.51 If the tenth day falls on a day when City offices are closed, the appeal deadline is extended through the next day when offices are open. The last day to file an appeal is February 9, 2026. This decision becomes effective on February 10, 2026. Prior to such effective date, a member of the City Council may request that it be called for review to the City Council. However, if there is a request for a call for review, the appeal period will continue to run. Appeals must cite a reason for objecting to a decision. Please note that appeals and calls for review are conducted as de novo reviews, meaning that the lower decision is set aside and the entire application is reviewed as a new proposal.
This approval expires one year from the effective date. The approval may be extended for one year by filing a written request with the Planning Director before the expiration of the effective date (along with the fee for renewal of an approval). Any changes in the approved design for the project must be submitted to City staff for review and approval. Major or minor changes must be reviewed as part of a separate application for changes to an approved project. Major changes must be reviewed by the Design Commission at a noticed public hearing. Two applications for changes to the project may be filed during a calendar year. Changes may be approved only if there are findings of changed circumstances that justify the revisions.
Please contact me if you have any questions about this letter.
Sincerely,
Rathar Duong
Senior Planner
Design & Historic Preservation Section
Tel 626-744-7346
Email: [email protected]
Attachments:
A. Conditions of Approval
B. Approved Plans, Elevations & Renderings (Abridged – full plan set is available to view upon request)
cc: Address File; Energov; City Manager, City Clerk; City Council; City Council District 7 Liaison; Director of Planning & Community Development; Deputy Director of Planning & Community Development
ATTACHMENT A
CONDITIONS OF APPROVAL
1354 E. GREEN STREET
CONCEPT DESIGN REVIEW
The applicant or the successor in interest shall comply with the following conditions, which shall be reviewed and approval by the Design Commission during Final Design Review, and shall consider implementing the recommendation:
Design & Historic Preservation
1. The project shall comply with all Zoning Code requirements except as modified during the design review process.
2. Restudy and consider stepping the fourth floor along the south elevation to reduce the perceived building height from the adjacent St. Philip the Apostle School parking lot and playground and further study reducing the height of the rooftop mechanical screen and/or study ways to reduce its visual prominence through materiality, color or other means.
3. Roof drainage shall be routed within the building walls rather than in exposed downspouts.
4. Show vents/vent caps and their arrangement on the elevations, which shall be routed to the roof or, if infeasible, located on secondary elevations to the degree possible and arranged in a logical pattern. If vents are required to penetrate the building walls, provide specifications and details of the vent caps for staff review and approval.
5. If proposed, show the location of driveway security gates on the site and landscape plans and include drawings depicting their design.
6. A final landscape and irrigation plan, in compliance with Chapter 17.44 (Landscaping) of the Zoning Code, identifying all remaining and proposed vegetation and trees shall be submitted along with plans for Final Design Review. The plan shall include a mix of plant size and materials. Plant materials shall emphasize drought-tolerant and/or native species.
7. The project shall comply with the Model Water Efficient Landscape Ordinance and any changes to the proposed landscape design that may be required shall be reviewed and approved by staff prior to issuance of a building permit.
8. The project shall demonstrate compliance with Climate Action Plan (CAP) requirements.
9. RECOMMENDATION: Consider establishing the truck route for construction hauling to occur via Green Street rather than Holliston Avenue and establishing a delivery schedule for the operational building that occurs during non-peak school pick-up and drop-off hours to avoid conflicts with the adjacent St. Philip the Apostle School.
Department of Public Works
10. No private improvements may be placed within the public right-of-way, including, but not limited to, soldier beams, tie-backs, utility conduits, backflow preventers, transformers, fire sprinkler valve, decorative sidewalk and applicable parade post holes on Colorado Boulevard per Standard Drawing S-419. Private improvements may only be placed in the public right-of-way by submitting a license agreement, which must be approved by the City. The license agreement application for any private improvement within the public right-of-way shall be submitted to the Department of Public Works for review and shall be approved by the City before any permits are granted. The applicant shall submit the application, plan and processing fee/deposit, associated with processing the license agreement, at least three to four (3-4) months prior to the issuance of any building or demolition permits. An approved license agreement will allow the applicant to install and maintain the private improvements within the public right-of-way with conditions.
A license agreement for shoring requires an indemnity bond in order to guarantee that shoring and tie-backs are free from defect due to faulty material, workmanship and failure. Upon review of the license agreement exhibits, an indemnity bond estimate will be prepared and forwarded to the applicant. The estimated amount is equivalent to the cost of reconstructing the public right of way, including all affected utilities, public facilities, and infrastructures, based on the plane of failure at a 45-degree angle from the lowest point of excavation. The indemnity bond shall be submitted to the City prior to the execution of the agreement and the issuance of any building or demolition permits.
All steel rods in every tie-back unit shall be relieved of all tension and stresses, and any portion of soldier beams and any portion of the tie-backs located be removed entirely from the public right-of-way. A monthly monitoring report stamped and certified by a licensed surveyor shall be submitted to indicate that the deflection from any piles or soldier beams does not exceed one inch. Upon completion of construction, the developer or his contractor shall remove all tie-back rods within the public right-of-way.
The removal shall be documented by a report certified by a licensed deputy inspector.
The report shall be submitted to the City for review and approval. The applicant will be charged a penalty of $7,000 for each tie-back rod not removed from the public right-ofway. For temporary tie-backs or shoring, the maximum width of the license area fronting the development frontage(s) shall only extend to the centerline of the public right-of-way.
11. Green Street along the frontage of the subject property has an existing sidewalk width of 11 feet. In order to provide for a 12-foot wide sidewalk per the East Colorado Specific Plan, the applicant shall dedicate to the City a 1-foot strip of land along the subject frontage for street purposes, and construct a 12-ft wide sidewalk. Construction of new sidewalk and curb and gutter along the Green Street frontage is required.
The applicant shall be responsible for all the costs required to complete the dedications.
The dedication documents and processing fee/deposit shall be submitted to this office, at least three to four (3-4) months prior to the issuance of any permits. The dedication documents shall be executed and recorded prior to the issuance of a Certificate of Occupancy.
12. The applicant shall demolish existing and construct all new public improvements along the along the subject development frontages of Green Street and of Holliston Avenue, including concrete drive approach per Standard Plan S-403; concrete sidewalk per Standard Plan S-421; concrete curb and gutter per Standard Plan S-406. All public improvements shall be completed prior to the issuance of Certificate of Occupancy.
13. Green Street restoration, fronting the subject development, shall be a partial width (from the first lane line to gutter) cold milling and resurfacing of asphalt concrete roadway per Standard Plan S-415. The street restoration shall include the intersection at Holliston Avenue and shall be completed prior to the issuance of Certificate of Occupancy. Green Street contains asbestos paving material, see attached requirements for any work performed on said street.
14. The proposed development shall connect to the public sewer with one or more new sixinch diameter house sewers laid at a minimum slope of two percent. In accordance with PMC Chapter 13.24.010, house sewer “means that part of the horizontal piping beginning 24 inches from the exterior wall of the building or structure and extending to its connection with the public sewer.” The section of house sewers within the public right-ofway - from the property line to the public sewer, or within easement, shall be vitrified clay or cast iron pipe. The house sewer shall meet City Standards as determined by the Department of Public Works, and a permit issued by the Department of Public Works is required for work within the public right-of-way. The construction of all new house sewers shall be completed prior to the issuance of Certificate of Occupancy.
15. In order to accommodate an Americans with Disabilities Act (ADA) compliant curb ramp, the applicant shall verify, and reconstruct if necessary, a standard curb ramp at all four corners of the Green Street and Holliston Avenue intersection, if possible, per Caltrans Standard A88A or City of Pasadena Standard No. S-414. The curb ramp construction shall be completed prior to the issuance of Certificate of Occupancy. A separate permit from the Department of Public Works is required for all construction in the public right-ofway. Please contact [email protected] for the general process.
The applicant shall submit to the City for review any proposed designs that will comply with the ADA requirements. The applicant is responsible for the design, preparation of plans and specifications, and construction of the new curb ramp. Plans for the curb return improvements shall be prepared by a civil engineer, registered in the State of California. Upon submittal of improvement plans to the Departments of Public Works for review, the applicant will be required to submit fees, per the current General Fee Schedule, to cover the cost of plan checking and construction inspection of the improvements. Note that the building plans approved by the City’s Planning (Building) Department do not constitute approvals for work in the public right-of-way. Separate plans shall be submitted to the Department of Public Works – Engineering Division – at 175 North Garfield Avenue Window 6. The applicant shall submit the curb return improvement plans and the plan check fees at least two (2) months prior to the issuance of any building or demolition permits.
Upon review of the curb ramp improvement plans, the applicant may need to dedicate to the City for street purposes the land necessary at the subject property line corner rounding per Standard Plan S-423 to provide for the minimum clearance required by the Americans with Disabilities Act standards. If so, the applicant shall remove and reconstruct the sidewalk for the dedicated area, per Standard Plan No. S-421. The applicant shall be responsible for all the cost required to complete the dedication, if it is required. The dedication document and processing fee shall be submitted to this office, at least three to four (3-4) months, prior to issuance of any permits. The dedication documents shall be executed and recorded prior to the issuance of a Certificate of Occupancy.
16. The existing street lighting along the Green Street and Holliston Avenue frontages is substandard. In order to improve pedestrian and traffic safety, the applicant shall replace/renovate three existing street lighting, on the frontages of the subject property per the City requirements and current standards. The renovation shall include but not limited to new LED light(s), conductors, lamp socket, fuse, globe/lantern, globe holder, photo cell, and miscellaneous related parts.
17. The applicant is responsible for the design, preparation of plans and specifications, and construction of all required public improvements. Plans for the above improvements shall be prepared by a civil engineer, registered in the State of California. Upon submittal of improvement plans to the Departments of Public Works for review, the applicant will be required to place a deposit with the department to cover the cost of plan checking. The amount of deposit will be based on the current City’s General Fee Schedule. Note that building plans approved by the City’s Planning (Building) Department do not constitute approvals for work in the public right-of-way. Separate plans shall be submitted to the Department of Public Works – Engineering Division – at 175 North Garfield Avenue Window 6. The applicant shall submit public improvements plans and the plan check deposit at least two (2) months prior to the issuance of any building or demolition permits.
18. Pruning of street trees may be required to facilitate the construction of the project. The work shall be done by the City’s crew. The applicant shall be responsible for the cost of pruning the street trees and submit to the Department of Public Works the appropriate fee per General Fee Schedule, for the City crew to prune the street trees.
19. Any proposed removal of public street trees shall be subject to the review and support of the City’s Urban Forestry Advisory Committee.
20. All new drive approaches shall be at least seven (7) feet clear of the existing street trees measured from the edge of the trunk closest to the drive approach. All public trees shall be protected and fenced with a posting on the fences advising of the tree protection.
21. To protect existing City trees during construction, the applicant shall fully conform to the Tree Protection Guidelines signed by the City Manager. The full guidelines are available at the following link: https://www.cityofpasadena.net/public-works/engineering-andconstruction/engineering/
22. A Tree Protection Zone (TPZ) shall be established for all existing City trees within the scope of a construction project. The TPZ extends from the base of the tree to four (4) radial feet beyond the dripline of a tree and applies to the entirety of the tree – from the roots to the canopy of the tree.
23. The applicant is prohibited from the following within a designated TPZ: construction vehicle access, construction vehicle operation, staging of materials, and trenching without the consent of the Department of Public Works.
24. The applicant shall at minimum provide the following within a designated TPZ: mulching, irrigation, and protective fencing.
25. Prior to the issuance of any permit, the applicant shall submit a Preliminary Tree Protection Plan (PMC Ch. 8.52 – City Trees and Tree Protection Ordinance), prepared by a Landscape Architect or certified Arborist, showing the TPZ and all structures, footings, and grading that may impact City trees shall be submitted to the Department of Public Works, for review and approval. Given that each construction project poses unique conditions, it is the responsibility of the applicant to develop a Tree Protection Plan based off the TPZ standards to the extent feasible. The Plan shall conform to the Tree Protection Standards which specifically require showing the locations of all existing trees, their diameters, canopies, whether the tree is a public tree or private tree, as well as any trees to be planted with their canopy at mature size. The final conditions of the Tree Protection Plan shall be approved by the Forestry Superintendent. A nonrefundable flat fee, per the current General Fee Schedule, will be required for staff time to review the Tree Protection Ordinance compliance.
26. Prior to any construction, tree protections including the installation of fencing to protect public trees must be in place. The fencing material shall be chain-link attached to posts inserted into the ground at the edge of the dripline and shall be a minimum of 6’ in height. See Standard Plan S-642 – Tree Protection Chain Link Fencing. Fencing shall maintain visual lines of sight in order to avoid vehicle and pedestrian hazards. Fencing shall include a minimum 8.5” x 11” warning sign with the following information: ‘Tree Protection Zone’; name and contact information of project owner or authorized representative; ‘Please contact the City of Pasadena Citizen Service Center to report any concerns (626) 744-7311’. All protective fencing must be permitted, inspected and approved by Public Works prior to the commencement of any construction.
27. Prior to issuance of any permit, the applicant shall submit a valuation assessment report of the existing public tree(s) along the boundary of their project. The report shall be prepared by a registered Arborist and submitted to PNR for review and approval. If it is determined that the applicant has failed to care for any City tree within their Tree Protection Plan, and the health of the tree(s) was critically compromised requiring its removal, the applicant shall be liable for the following costs: assessed value of tree determined by a PNR Arborist using a current ISA assessment methodology; the removal cost determined by PNR; and any applicable infraction or administrative fines determined by Code Compliance
28. Prior to issuance of any permit, a deposit in the amount of the applicant’s total liabilities based on the aforementioned approved tree assessment report shall be submitted to the City. The deposit is fully refundable, less administrative fees, upon the satisfaction of Public Works prior to the issuance of a Certificate of Occupancy.
29. The applicant shall plant the officially designated street tree per the City’s approved Master Street Tree Plan along the boundary of the subject property – (4) maximum new Ficus (Ficus Microcarpa) trees on Green Street frontage, spaced 40 feet center-tocenter. The Department of Public Works will confirm eligible planting sites, and will provide the applicant the location, quantity and tree species to be planted as a result of the applicant’s project.
Trees planted by the applicant must meet the City’s tree stock standards, be inspected by the City, and be planted according to the details provided by the Parks and Natural Resources (PNR) Division. Planting shall include the installation of the following per tree:
no less than two tree stakes; one arbor guard; and the use of slow-release fertilizer tablets. The applicant shall contact PNR (626-744-3880) for tree planting approval, a minimum of two (2) months, prior to the issuance of a Certificate of Occupancy.
Trees planted by the applicant must be irrigated by either an existing or a new irrigation system constructed by the applicant. Plans for the irrigation system shall be prepared by a landscape architect registered in the State of California and submitted to PNR for review and approval. Irrigation facilities (main line, valve, pull box, timer, etc.) must be constructed within private property with the exception of the laterals and bubblers. The lateral shall be a minimum of 18” deep, and no above-ground structures are allowed.
Prior to issuance of the Certificate of Occupancy, the applicant shall submit a Tree Guarantee Deposit equal to the cost of all new trees planted to guarantee that newly planted trees are maintained by the applicant for a minimum of three calendar years.
Tree maintenance during this period shall include the following: watering no less than once a week; weed removal; reconstruction of tree wells as needed; re-staking as needed; adjustment to grade of any trees that settle; and any other operations needed to assure normal tree growth. The applicant shall replace any newly planted trees which, for any reason, die or whose health is compromised, within the applicant’s three-year establishment period. The three-year tree establishment period shall commence on the day that the Certificate of Occupancy is issued. PNR shall inspect all trees planted by the applicant at the end of the three-year establishment period, and if the trees are found to be in good health, the applicant’s deposit will be released. If the trees are found to be in poor health, the establishment period may be extended by PNR and the applicant’s deposit shall be held accordingly. Said deposit may be included as part of the construction guarantee if applicable, and is subject to partial refund or additional billing.
30. In order to ensure that the developer maintains a clean and safe site during the construction phase of development, the applicant shall place a $20,000 refundable deposit with the Department of Public Works prior to the issuance of any permit. This deposit is a guarantee that the applicant will keep the site clean and safe, and will make permanent repairs to the abutting street improvements that are damaged, including striping, slurry seal/ resurfacing, street trees, curb, gutter, and sidewalk, either directly or indirectly, by the construction on this site. This deposit may also be used for charges due to damage to existing street trees and for City personnel to review traffic control plans and maintain traffic control.
31. Prior to the start of construction or the issuance of any permits, the applicant shall submit a Construction Staging and Traffic Management Plan to the Department of Public Works for review and approval. The template for the Construction Staging and Traffic Management Plan can be obtained from the Department of Public Works webpage at:
https://www.cityofpasadena.net/public-works/engineering-and-construction/engineering/ .
A non-refundable flat fee, based on the current General Fee Schedule, is required for plan review and on-going monitoring during construction. This plan shall show the impact of the various construction stages on the public right-of-way (and the private street) including all street occupations, lane closures, detours, staging areas, and routes of construction vehicles entering and exiting the construction site. An occupancy permit shall be obtained from the department for the occupation of any traffic lane, parking lane, parkway, or any other public right-of-way. All lane closures shall be done in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) and California Supplement.
If the public right-of-way occupation requires a diagram that is not a part of the MUTCD or California Supplement, a separate traffic control plan must be submitted as part of the Construction Staging and Traffic Management Plan to the department for review and approval. No construction truck idling or staging, material storage, or construction trailer are allowed in the public right-of-way.
All costs associated with these conditions shall be the applicant’s responsibility. Unless otherwise noted in this memo, all costs are based on the General Fee Schedule that is in effect at the time these conditions are met.
In addition to the above conditions, the requirements of all applicable Pasadena Municipal Code (PMC) will apply and be implemented during the corresponding plan review and permitting. They may include but not limited to:
Sidewalk Ordinance - Chapter 12.04
Sewer Facility Charge – Chapter 4.53
Residential Impact Fee – Chapter 4.17
City Trees and Tree Protection Ordinance - Chapter 8.52 Construction and Demolition Waste Ordinance - Chapter 8.62 Holiday Moratorium of activities within public right-of-way – Chapter 12.24.100
EXCAVATION OF ASBESTOS-CONTAINING ASPHALT ON GREEN STREET Background:
In 1971, Green Street, between Orange Grove Boulevard and Hill Avenue, was paved with asphalt containing asbestos in the top two inches. The Department of Public Works has established policies and procedures for cutting and/or grinding the pavement on this street. All utility companies are requested to inform all field personnel of the asbestos on Green Street and to post a copy of these policies and procedures which are to be followed, including having a certified hazmat contractor on-site, even if not required by a permit.
Samples containing asbestos concentrations greater than 1% are considered asbestos containing materials, or ACMs, in accordance with the US EPA definition of ACM. Those samples containing greater than 0.1% but less than or equal to 1% are considered asbestos containing construction materials, or ACCMs, in accordance with Cal/EPA definition.
Areas of Green Street containing ACMs:
Pasadena Avenue to De Lacey Avenue
Fair Oaks Avenue to Raymond Avenue
Los Robles Avenue to Hudson Avenue
Catalina Avenue to Holliston Avenue
Areas of Green Street containing ACCMs:
Hudson Avenue to Catalina Avenue
Holliston Avenue to Hill Avenue
ACMs containing greater than 1% asbestos are required to be abated prior to the demolition or re-surfacing activities that will impact or disturb the ACMs resulting in the creation of airborne asbestos fibers. ACCMs require that they be disturbed by personnel with asbestos training but may be disposed of as non-regulated waste in accordance with applicable regulations. All ACMs and ACCMs shall be abated by a State of California licensed asbestos abatement contractor using 40-hour asbestos trained workers and appropriate wet methods and engineering controls.
All asbestos abatement workers must have current asbestos training documentation, current medical exams and releases, and current fit tests for the use of personal protective equipment (PPE). The asbestos abatement contractor shall be responsible for estimating and verifying dimensions and quantities of ACMs and ACCMs to be abated. Asbestos abatement methods must comply with Title 8, Section 1529 of the California Code of Regulations (CCR) and the South Coast Air Quality Management District (SCAQMD) Rule 1403.
Excavation Conditions:
32. Contractor shall show certification that it is a state approved environmental remediation firm.
33. All work must comply with the City of Pasadena “Utility Excavation Permits – Policies and Procedures.
34. Air monitoring data shall be recorded and copies provided daily to the City of Pasadena.
35. If exposure levels exceed 0.1 fiber per cubic centimeter, then it is mandatory that respiratory protection be worn and exposure levels reduced to the extent feasible.
36. The work shall be registered with CAL OSHA by the permittee and comply with CAL OSHA regulations.
37. All liquids will be vacuumed and disposed of at a designated, licensed disposal facility.
Vacuum equipment shall be equipped with a HEPA filter.
38. The composite structural section of asphalt on concrete shall be removed in one unit to the extent practical to minimize asbestos exposure.
39. The excavation area shall be constantly sprayed with water to control dust and other airborne particles.
40. Technicians will wear Personal Pump Air Monitoring devices as well as utilize air sniffers as required by law.
41. All personnel will wear the appropriate level of personal protection equipment and full face respirators with HEPA filter cartridges while in the work zone.
42. All personnel must have appropriate training in the removal of hazardous materials.
43. The following prohibitions apply:
(a) Using compressed air to remove asbestos or asbestos containing material. (b) Dry sweeping, shoveling or other dry clean-up of dust and debris containing asbestos.
(c) Employee rotation as a means of reducing employee exposure to asbestos.
Department of Transportation
44. In accordance with City Ordinance No. 7157 and PMC Chapter 10.64, the project is subject to the City’s Trip Reduction Ordinance (TRO) requirements. • Per the requirements, a Transportation Demand Management (TDM) Plan shall be submitted for review and approval prior to receipt of the Certificate of Occupancy and a review fee of $2,000 shall be paid prior to the issuance of the first permit for construction (demolition, grading, or building). • The plan shall conform to the requirements set forth in PMC Chapter 10.64, including the annual reporting requirement and fee.
• The plan shall include the following TDM strategies from the California Air Pollution Control Officers Association (CAPCOA) Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity (2024):
o Commute trip reduction program with mandatory monitoring (Strategy T-6)
o Employee parking cash-out (Strategy T-13)
• To understand the TDM Plan requirements and associated review fees for the report submittal, contact the Multimodal Planning Division at (626) 744- 7494 for submittal requirements.
• The review fee is based on the current General Fee Schedule and are subject to change.
The project is not expected to exceed any of the CEQA thresholds outlined in DOT’s Transportation Impact Analysis Guidelines.
45. Pursuant to the adopted East Colorado Specific Plan and PMC Section 17.31.050, the project shall comply with the following:
• Green Street is required to have a 12-foot sidewalk, consisting of a sevenfoot (7’) walk zone and five-foot (5’) amenity zone by additional right-of-way dedication.
• Per PMC 17.30.040, the project shall provide for sidewalks that meet the required widths. Where the existing sidewalk right-of-way is less than the required width, the difference shall be provided through a private property dedication.
46. Pursuant to the adopted Street Design Guidelines, the applicant shall comply with the following:
• Holliston Avenue is an Access Street and should have a minimum eightfoot (8’) sidewalk, including a minimum five-foot (5’) walk zone and threefoot (3’) amenity zone.
47. Driveway visibility shall comply with the minimum requirement specified in PMC Section 17.40.180 & 17.46.170. Please note that the edge of driveway or back of sidewalk may change due to right-of-way dedication, as specified in the Public Realm – Sidewalks condition. Driveway visibility triangle shall be included in plans and be approved by the Department of Transportation prior to the issuance of the first permit for construction (demolition, grading, or building). Any deviations will have to be approved by the City Traffic Engineer.
48. The applicant is responsible for the design, preparation of plans and specifications, and construction of all required public improvements. For transportation, such changes include, but are not limited to, the removal, relocation, and reconstruction of traffic control devices (i.e., longitudinal markings, pavement markings, curb markings, signage, and channelizing devices). All required public improvements shall be coordinated with the City of Pasadena’s Department of Public Works.
Reference Public Works Conditions of Approval for more information.
49. Driveway approaches shall be located a minimum distance of fifty feet (50’) from the curb of any intersecting street. Driveway approaches design shall comply with the latest City of Pasadena standards. Driveway approach locations must be approved by the Department of Transportation prior to the issuance of the first permit for construction (demolition, grading, or building). All required public improvements shall be coordinated with the City of Pasadena’s Department of Public Works. Reference Public Works Conditions of Approval for more information.
50. All existing bus zones and transit amenities shall remain in place and protected during and after construction. The existing bus zone will not be relocated without written approval from the Transit Division. Tree wells, streetlights, fire hydrants and other items shall not be placed in the public right of way within bus zone(s) without prior approval. The proposed project shall not interfere with bus operations (this includes, but is not limited to, building overhangs, awnings, landscaping, etc.).
51. Driveway design, width, and clearance shall comply with the minimum requirements specified in PMC Section 17.46.150.
• Given that the outbound driveway for the subterranean parking is located on Green Street, which is a one-way street (eastbound), install a porkchop or other type of physical diverter in the driveway to reinforce the right-out only access for this driveway.
• The driveway design shall be approved by the Department of Transportation prior to the issuance of the first permit for construction (demolition, grading, or building). Any deviations will have to be approved by the City Traffic Engineer.
52. Ramp design shall comply with the minimum requirements as specified in PMC Section 17.46.270.
• To improve the safety of pedestrians crossing the driveway, the ramp shall have a two percent (2%) or less grade for the first twenty feet (20’) from the back of the sidewalk.
• The driveway apron width shall match the ramp width.
• To improve the safety of pedestrians crossing the driveway, the design plans shall indicate either a 20-foot (20’) flat area beyond the property line to improve vehicular sight distance or include the installation of an exit arm. • The ramp grade shall not exceed sixteen percent (16%), with the first and last ten feet (10’) of the ramp not exceeding eight percent (8%). • Diverter in the driveway to reinforce the right-out access for this driveway. • The ramp design shall be included in the plans and be approved by the Department of Transportation prior to the issuance of the first permit for construction (demolition, grading, or building). Any deviations will have to be approved by the City Traffic Engineer.
53. If proposed, a vehicle entry gate shall be setback a minimum of twenty feet (20’) from the back of the sidewalk. The gate shall be included in plans and approved by the Department of Transportation prior to the issuance of the first permit for construction (demolition, grading, or building). Any deviations will have to be approved by the City Traffic Engineer.
54. Any loading/unloading spaces shall be off-street and on-site. A loading zone will not be installed in the public right of way. Off-Street loading shall comply with the minimum requirements as specified in PMC Section 17.46.260.
55. The parking, loading, and trash/recycling areas shall conform to the requirements of the Pasadena Municipal Code and a plan showing all pertinent dimensions for these areas shall be submitted to the Department of Transportation for review and approval prior to the issuance of the first permit for construction (demolition, grading, or building).
56. Prior to the start of construction or the issuance of any permits, the applicant shall submit a Construction Staging & Traffic Management Plan to the Department of Public Works for review and approval. This plan shall show the impact of the various construction stages on the public right-of-way including street occupations, parking space relocation agreements, closures, detours, staging areas, and routes of construction vehicles entering and exiting the construction site. Permitted hours for construction vehicles (delivery, haul) may be limited to the hours between 9:00 AM and 3:00 PM.
57. The Traffic Reduction and Transportation Improvement Fee (Ordinance No. 7076) will apply to all net new residential, retail, industrial, and office developments and is based on the City of Pasadena General Fee Schedule. The fee will be calculated and invoice prior to the issuance of Certificate of Occupancy. The fee per unit is subject to change based on the time of the project completion. Affordable housing projects may receive fee credits.
This study and conditions have been prepared based on the project scope provided to DOT. An update of the traffic study and its finding might be required if a significant change is made to the project scope, or if additional analysis is requested by the City.
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
PAS-G0.101
COVER SHEET
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
The Project Site is located at 1364 E Green Street, which consists of 3 parcels, containing 41,573 square feet and is bounded by Holliston Avenue to the west. There is an existing 117 stall surface parking lot that spans all 3 parcels. The proposed project will be a 4-story Multi-tenant Research and Development building, with Lab/Office spaces on the ground level along with 3 subterranean levels of parking.
APN 5736-002-013
SETBACKS 5-10’ FOR 50% ON HOLLISTON
3-8’ FOR 75% ON GREEN STREET
MINIMUM TRANSPARENCY GREEN ST OVERALL FACADE REQUIRED 30% MIN OVERALL FACADE PROPOSED 50% GROUND FLOOR REQUIRED 70% MIN GROUND FLOOR PROPOSED 73% HOLLISTON AVE OVERALL FACADE REQUIRED 30% MIN OVERALL FACADE PROPOSED 39% GROUND FLOOR REQUIRED 70% MIN GROUND FLOOR PROPOSED 72% OPEN SPACE REQUIREMENT 60% REDUCTION OF REQUIREMENT FOR R&D PROJECTS COMMON REQUIRED (5% OF GSF) 1,871 SF (93,539 X 5% = 4,677. 4,677 X 40% =1,871) COMMON PROPOSED: 5,917 SF PAOS REQUIRED (2% OF GSF) 748 SF (93,539 X 2% = 1,871. 1,871 X 40% = 748) PAOS PROPOSED: 1,060 SF
MODULATION
FACADE LENGTH EACH STREET-FACING FACADE EXCEEDING 150'
SHALL INCLUDE A BREAK OF AT LEAST 10% OF THE
FACADE LENGTH OR 20', WHICHEVER IS GREATER GREEN ST OVERALL FACADE LENGTH: 177'-0" MIN REQ. FACADE BREAK LENGTH/DEPTH: 20'-0" / 10'-0" PROPOSED FACADE BREAK LENGTH/DEPTH: 20'-0" / 15'-0"
HOLLISTON AVE OVERALL FACADE LENGTH: 177'-0" MIN REQ. FACADE BREAK LENGTH/DEPTH: 20'-0" / 10'-0" PROPOSED FACADE BREAK LENGTH/DEPTH: 20'-0" / 10'-0"
FACADE AREA EACH STREET-FACING FACADE EXCEEDING 50' IN
LENGTH SHALL MODULATE A MINIMUM OF 25% OF
THE AREA ABOVE THE FIRST STORY GREEN ST
PROPOSED PERCENTAGE OF MODULATION 29%
HOLLISTON AVE
PROPOSED PERCENTAGE OF MODULATION 29%
VICINITY MAP
ZONING INFORMATION BUILDING NARRATIVE
ADDITIONAL ZONING INFORMATION
TOTAL AREA OF SITE
GROSS BUILDING AREA CALCULATIONS
SQUARE FOOTAGE - EXISTING
SQUARE FOOTAGE - PROPOSED
NUMBER OF BUILDINGS - EXISTING
NUMBER OF BUILDINGS - PROPOSED
EXISTING BUILDING CONSTRUCTION DATES
VEHICULAR PARKING - EXISTING
VEHICULAR PARKING - MINIMUM REQ. PER CODE *
* PURSUANT TO GOVERNMENT CODE SECTION 65863.2
(AB2097) SINCE THE SITE IS WITHIN ONE-HALF MILE OF PUBLIC TRANSIT, THE CITY SHALL NOT IMPOSE OR
ENFORCE MINIMUM AUTOMOBILE PARKING ON THE
PROPOSED DEVELOPMENT. WHERE PARKING IS
PROVIDED VOLUNTARILY, SPACES SHALL COMPLY WITH APPLICABLE REQUIREMENTS OF THE ZONING CODE.
VEHICULAR PARKING - PROPOSED
BICYCLE PARKING - EXISTING
BICYCLE PARKING - MINIMUM REQ. PER CODE
BICYCLE PARKING - PROPOSED
LOADING SPACES - EXISTING
LOADING SPACES - MINIMUM REQ. PER CODE
LOADING SPACES - PROPOSED
FAR - EXISTING
FAR - MAX ALLOWED PER ZONING CODE
FAR - PROPOSED
BUILDING HEIGHTS & STORIES - EXISTING
BUILDING HEIGHTS & STORIES - PROPOSED
PROPOSED LANDSCAPING
PROPOSED HARDSCAPE/PAVING
EXISTING ZONING AND LAND USE DESIGNATION
COMMERCIAL LAND USE
OCCUPANCY GROUP, CONSTRUCTION - EXISTING
OCCUPANCY GROUP, CONSTRUCTION - PROPOSED
41,573 SF
N/A
93,539 SF N/A
1 N/A
117
2 PER 1,000 SF = 187 SPACES
ADDITIONAL SPACES ALLOWED BY RIGHT = 93
(187 + 50%); 280 SPACES
261 SPACES
0 5% OF MIN. REQ. VEHICULAR PARKING = 9 SPACES CLASS 1 (75% OF MIN. REQ.) = 7 CLASS 2 (25% OF MIN. REQ.) = 2 CLASS 1 = 7 CLASS 2 = 2 N/A
1 PER 40,000 SF WHERE GSF IS 40,001 SF AND MORE =
2 SPACES
2 SPACES AT 10' X 20' MIN, 12' VERTICAL CLEARANCE
N/A
2.25 93,539 / 41,573 = 2.25
N/A
63' + 15' MECH SCREEN / 4 STORIES
930 SF
721 SF
EC-MU-N: MIXED-USE NEIGHBORHOOD
RESEARCH & DEVELOPMENT
BUILDING ACTIVITIES AND SERVICES TYPICALLY
INCLUDE OFFICE WORK RELATED TO LAB R&D
S-2, N/A
B, TYPE I-B
SHEET NO. SHEET NAME
00 GENERAL
PAS-G0.101 COVER SHEET
PAS-G0.102 SURVEY
PAS-G0.103 SURVEY/TOPO
PAS-G0.201 GROSS AREA EXHIBIT
PAS-G0.202 OPEN AREA - PAOS EXHIBIT
PAS-G0.203 OPEN AREA - COMMON AREA EXHIBIT
01 CIVIL
PAS-C1.10 EXISTING/DEMO SITE PLAN
03 ARCHITECTURE
PAS-A1.102 PROPOSED SITE PLAN
PAS-A1.102A PROPOSED SITE PLAN - ZONING EXHIBIT
PAS-A1.102B PROPOSED SITE PLAN - FRONTAGE EXHIBIT
PAS-A1.103 PROPOSED CIRCULATION PLAN
PAS-A1.201 PROPOSED FLOOR PLAN - LEVEL 01
PAS-A1.202 PROPOSED FLOOR PLAN - LEVEL 02
PAS-A1.203 PROPOSED FLOOR PLAN - LEVEL 03
PAS-A1.204 PROPOSED FLOOR PLAN - LEVEL 04
PAS-A1.205 PROPOSED FLOOR PLAN - ROOF LEVEL
PAS-A1.205A PROPOSED FLOOR PLAN - ROOF LEVEL - AREA EXHIBIT PAS-A1.B01 PROPOSED FLOOR PLAN - LOWER LEVEL 01
PAS-A1.B02 PROPOSED FLOOR PLAN - LOWER LEVEL 02
PAS-A1.B03 PROPOSED FLOOR PLAN - LOWER LEVEL 03
PAS-A2.101 BUILDING ELEVATIONS
PAS-A2.102 BUILDING ELEVATIONS
PAS-A2.103 BUILDING ELEVATIONS
PAS-A2.104 BUILDING ELEVATIONS
PAS-A2.105 BUILDING ELEVATIONS - SECONDARY
PAS-A2.106 BUILDING ELEVATIONS - MODULATION EXHIBIT
PAS-A2.107 BUILDING ELEVATIONS - TRANSPARENCY EXHIBIT
PAS-A3.101 BUILDING SECTIONS
PAS-A3.102 BUILDING SECTIONS
PAS-A3.103 PARKING RAMP AND CLEARANCES EXHIBIT
PAS-A3.104 VIEW CORRIDOR EXHIBIT
PAS-A4.101 PERSPECTIVE RENDERINGS
PAS-A4.102 PERSPECTIVE RENDERINGS
PAS-A4.103 PERSPECTIVE RENDERINGS
PAS-A4.104 PERSPECTIVE RENDERINGS
PAS-A5.100 SHADOW STUDY
04 LANDSCAPE
L1.001 PLANTING PLAN - LEVEL 01
L1.002 HARDSCAPE PLAN - LEVEL 01
L1.003 TREE DEMOLITION PLAN - LEVEL 01
L1.004 PLANTING PLAN - LEVEL 04
L1.005 HARDSCAPE PLAN - LEVEL 04
SHEET INDEX
GROSS AREA BY FLOOR
AREA SCHEDULE (GROSS FLOOR AREA)
LEVEL NAME AREA
LOWER LEVEL 03
LOWER LEVEL 03 MECH 661 SF
661 SF
LOWER LEVEL 02
LOWER LEVEL 02 MECH 655 SF
655 SF
LOWER LEVEL 01
LOWER LEVEL 01 MECH 2,971 SF
2,971 SF
LEVEL 01
LEVEL 01 GROSS AREA 16,756 SF
LEVEL 01 MECH 1,772 SF
18,528 SF
LEVEL 02
LEVEL 02 GROSS AREA 28,554 SF
LEVEL 02 MECH 1,125 SF
29,678 SF
LEVEL 03
LEVEL 03 GROSS AREA 28,554 SF
LEVEL 03 MECH 1,125 SF
29,678 SF
LEVEL 04
LEVEL 04 GROSS AREA 19,321 SF
LEVEL 04 MECH 1,125 SF
20,446 SF
ROOF LEVEL
ROOF LEVEL ELEVATORS 353 SF
ROOF LEVEL MECH (APPURTENANCE) 1,680 SF
2,034 SF
Grand total 104,651 SF
GROSS FLOOR AREA IS THE TOTAL ENCLOSED AREA OF ALL FLOORS OF A BUILDING MEASURED TO THE
INSIDE FACE OF THE EXTERIOR WALLS INCLUDING HALLS, STAIRWAYS, ELEVATOR SHAFTS AT EACH FLOOR
LEVEL, SERVICE AND MECHANICAL EQUIPMENT ROOMS AND BASEMENT OR ATTIC AREAS HAVING A HEIGHT OF MORE THAN SEVEN FEET, BUT EXCLUDING AREA USED EXCLUSIVELY FOR PARKING OR LOADING OF VEHICLES OR BICYCLES. GROSS FLOOR AREA SHALL INCLUDE ROOF APPURTENANCES THAT ARE ENCLOSED AND IS SEPARATE FROM FLOOR AREA RATIO (FAR).
FAR EVALUATES ABOVE-GROUND GROSS AREA AND WHEN CALCULATED FOR R&D EXCLUDES FLOOR AREA DEVOTED TO MECHANICAL SPACE AND APPURTENANCES 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
ATTACHMENT C
E GREEN STREET
S HOLLISTON AVENUE
(N) PROPOSED
LAB/OFFICE BUILDING
CENTERLINE OF STREET
CENTERLINE OF STREET
(E) WALL TO REMAIN
(E) WALL TO REMAIN
(N) SUBTERRANEAN DRY WELL
(N) TRANSFORMER VAULT
ACCESS HATCH
2 0
7' - 0" P
R
O
P
E
R
TY
B
O
U
N
D
A
RY
78' - 0" 21' - 0" 78' - 0"
177' - 0" OVERALL BUILDING LENGTH
177' - 0" OVERALL BUILDING LENGTH
201' - 0" PROPERTY BOUNDARY
78' - 0" 21' - 0" 78' - 0"
177' - 0"
177' - 0"
PROPERTY LINE BEFORE DEDICATION
PROPERTY LINE AFTER DEDICATION
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
31' - 8"
LANDSCAPED AREA;
SEE LANDSCAPE DRAWINGS
ONE-WAY DRIVEWAY
10' - 0"
20' - 0"
20' - 0"
10' - 0"
LOADING SPACE 01
LOADING SPACE 02
R 25' - 0"
MIN DRIVEWAY WIDTH
12' - 0"
R 25' - 0"
14' - 0"
1' - 0"
MIN DRIVEWAY WIDTH
12' - 0" 1' - 0"
12'-0" VERTICAL CLEAR
12'-0" VERTICAL CLEAR
EL. ~490.75
+2'-3" ABOVE LOWEST
POINT ON LOT
EL. ~488.50
LOWEST POINT ON LOT
AT BUILDING EDGE
R 25' - 0"
8' - 0" 15' - 1"
8' - 6" 21' - 7"
11' - 6"
CARPOOL /
VANPOOL
LOADING
CARPOOL /
VANPOOL
LOADING
26' - 2"
FIRE ACCESS
5' - 0"
FIRE ACCESS
5' - 0"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.102
PROPOSED SITE PLAN
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1" = 10'-0" PROPOSED SITE PLAN 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01 PAS-A3.101
________________
01 PAS-A3.102
________________
LOBBY
PAOS
WOMEN
MEN
TENANT
IDF
ELEC
TENANT
LT BICYCLE
PARKING
01 PAS-A2.105 03
PAS-A2.105
07 05
(N) SUBTERRANEAN DRY WELL
(N) TRANSFORMER VAULT
ACCESS HATCH
GENERATOR
(MECH)
ST BICYCLE PARKING
207' - 0" PROPERTY BOUNDARY
1 3
4 6
2 5
A B C D E F
78' - 0" 21' - 0" 78' - 0"
78' - 0" 21' - 0" 78' - 0"
177' - 0"
177' - 0"
COMMERCIAL TENANT AVERAGE INTERIOR DEPTH
70' - 6"
COMMERCIAL TENANT AVERAGE INTERIOR DEPTH
55' - 9"
COMEMERCIAL TENANT AVERAGE INTERIOR DEPTH
91' - 3"
ENTRY CANOPY OVERHEAD
EL. 490.75
EL. 488.50
4' - 10" 26' - 2"
1' - 6" 10' - 0" 8' - 0" 10' - 0" 1' - 6"
G-09
G-01
01 PAS-A3.103
________________
22' - 0"
PAS-A2.107
01 PAS-A2.107 02
CARPOOL /
VANPOOL
LOADING REFUSE
STORAGE
8' - 6" 177' - 0" 21' - 7"
15' - 1" 177' - 0" 8' - 0"
201' - 0" PROPERTY BOUNDARY
EL. 488.50
12' - 7"
14' - 0"
7'-0" MIN
VERTICAL CLEARANCE
NARROWEST INTERIOR DEPTH
26' - 6"
5' - 7" 23' - 8 1/2" 1' - 3 1/2"
1' - 9" 17' - 6" 1' - 9"
1' - 6" 10' - 0" 8' - 0" 10' - 0" 1' - 6" 1' - 6" 10' - 0" 5' - 0" 10' - 0" 4' - 6" 1' - 6" 10' - 6" 5' - 0" 12' - 0" 2' - 0" ADA
STD
ADA
VAN
ADA
STD
ADA
VAN
ADA
STD
ACC
EVCS AMB
ACC
EVCS
STD
ACC
EVCS
VAN
G-08
G-10
ADA
STD
ADA
STD
18' - 0"
18' - 0"
5' - 0" 9' - 6"
10' - 0" 11' - 6" 4' - 0" 9' - 0"
CARPOOL /
VANPOOL
LOADING
8.0% 16.0% 5.0%
(MIN SLOPE TO DRAIN, 5% MAX)
65' - 0" RAMP
10' - 0" 45' - 0" 10' - 0"
8.0%
EL. 490.75
11' - 6"
LOADING
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.201
PROPOSED FLOOR PLAN - LEVEL 01
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED FLOOR PLAN - LEVEL 01 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01 PAS-A3.101
________________
01 PAS-A3.102
________________
TENANT
MEN
ELEC
IDF
WOMEN
MEP TI
(MECH)
01 PAS-A2.105 03
PAS-A2.105
07 05
MECH SHAFT
MECH SHAFT
MECH SHAFT
1 3
4 6
2 5
A B C D E F
PROPERTY BOUNDARY
207' - 0" PROPERTY BOUNDARY
201' - 0"
10' - 0" CLEAR
78' - 0" 21' - 0" 78' - 0"
78' - 0" 21' - 0" 78' - 0"
15' - 0" CLEAR
177' - 0"
177' - 0"
EL. 505.50
PAS-A2.107
01 PAS-A2.107 02
8' - 6" 177' - 0" 21' - 7"
15' - 1" 177' - 0" 8' - 0"
20' - 0" CLEAR
20' - 0" CLEAR
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.202
PROPOSED FLOOR PLAN - LEVEL 02
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED FLOOR PLAN - LEVEL 02 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01 PAS-A3.101
________________
01 PAS-A3.102
________________
01 PAS-A2.105 03
PAS-A2.105
07 05
CIRCULATION
ELEC
MEN
WOMEN
MEP TI
(MECH)
IDF
1 3
4 6
2 5
A B C D E F
MECH SHAFT
MECH SHAFT
MECH SHAFT
PROPERTY BOUNDARY
207' - 0" PROPERTY BOUNDARY
201' - 0"
10' - 0" CLEAR
78' - 0" 21' - 0" 78' - 0"
78' - 0" 21' - 0" 78' - 0"
177' - 0"
177' - 0"
EL. 520.50
PAS-A2.107
01 PAS-A2.107 02
8' - 6" 177' - 0" 21' - 7"
15' - 1" 177' - 0" 8' - 0"
20' - 0" CLEAR
20' - 0" CLEAR
15' - 0" CLEAR
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.203
PROPOSED FLOOR PLAN - LEVEL 03
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED FLOOR PLAN - LEVEL 03 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01 PAS-A3.101
________________
01 PAS-A3.102
________________
MEN
ELEC
IDF
WOMEN
MEP TI
(MECH)
01 PAS-A2.105 03
PAS-A2.105
07 05
MECH SHAFT
MECH SHAFT
MECH SHAFT
1 3
4 6
2 5
A B C D E F
PROPERTY BOUNDARY
207' - 0" PROPERTY BOUNDARY
201' - 0"
50' - 4" 129' - 1" 20' - 7"
19' - 5" 160' - 7" 27' - 1"
160' - 7 1/2"
EL. 535.50
PROPOSED PLANTING AREA;
SEE LANDSCAPE DRAWINGS
BUILDING EDGE TO ROOF TERRACE
5' - 0" MIN, TYP
TOTAL ROOF AREA: 26,077 SF
AREA OF ROOF DECK: 6,115 SF
COVERAGE OF ROOF DECK: 23%
(60% MAX)
UNOCCUPIED ROOF AREA
ROOF DECK
PAS-A2.107
01 PAS-A2.107 02
20' - 0" CLEAR
20' - 0" CLEAR
13' - 6" 26' - 7"
20' - 1"
46' - 0"
T.O. CANOPY
CANOPY ABOVE CANOPY ABOVE
EL. 546.83
T.O. CANOPY
EL. 546.83
36' - 0"
18' - 0"
36' - 0"
18' - 0"
15' - 0" CLEAR
10' - 0" CLEAR
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.204
PROPOSED FLOOR PLAN - LEVEL 04
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED FLOOR PLAN - LEVEL 04 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01 PAS-A3.101
________________
01 PAS-A3.102
________________
MECH
ROOF DRAIN, TYP
MECHANICAL SCREEN
CONCEPTUAL MECHANICAL
EQUIPMENT LAYOUT
PAS-A2.105
07 05
LOCATION OF
LOWEST EXISTING GRADE ELEVATION
(EL. 488.50)
TOP OF MECH SCREEN
TOP OF PARAPET
FINISH SURFACE AT ROOF
(HIGH POINT; VARIES W/ SLOPE)
MECH
ELEC
1 3
4 6
2 5
A B C D E F
EL. 566.50
EL. 551.25
EL. 551.50
PROPERTY BOUNDARY
207' - 0" PROPERTY BOUNDARY
201' - 0"
142' - 4" MECH SCREEN
8' - 0" 178' - 0" 21' - 1"
39' - 0" 146' - 6" 14' - 7"
109' - 4" MECH SCREEN
PAS-A2.107
01 PAS-A2.107 02
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.205
PROPOSED FLOOR PLAN - ROOF
LEVEL
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED FLOOR PLAN - ROOF LEVEL 01 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
78' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 16' - 0"
78' - 0"
63' - 0" 15' - 0"
S HOLLISTON AVE
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
10' - 5"
10' - 8"10' - 8"
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
78' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 16' - 0"
78' - 0"
MTL-04
MTL-03
CONC-01
CONC-01
GL-05
GL-01
CONC-01
GL-05
GL-01
MTL-02
EIFS-01
MTL-01
CONC-01
PROPERTY LINE
BUILDING ENVELOPE
~8' - 3" - 8' - 6"
8' - 3" (VARIES)
STEPBACK DEPTH
8' - 0" MIN STEPBACK HEIGHT 45' - 0"
~21' - 7" - 21' - 11"
21' - 7" (VARIES)
PROPERTY LINE
S HOLLISTON AVE
BUILDING ENVELOPE
3' - 3"
SETBACK
5' - 0" MIN
ARCH. PROJECTION
3"
INTERIOR SETBACK
15' - 0" MIN 6' - 7"
SHADE STRUCTURE
3"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
MTL-05 MTL-05
MTL-05
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01 METAL PANEL COLOR 01MTL-02 METAL PANEL COLOR 02
CONC-01 CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS W/ STUCCO
FINISH
MTL-03 MECH SCREEN OPAQUEMTL-04 MECH SCREEN
PERFORATED
MTL-05 CANOPY/TRELLIS
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.101
BUILDING ELEVATIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED BUILDING ELEVATION - NORTH / GREEN ST 01 SCALE: 1/8" = 1'-0" PROPOSED BUILDING ELEVATION - NORTH / GREEN ST (COLOR) 02 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
78' - 0"
16' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND
78' - 0"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
63' - 0" 15' - 0"
E GREEN ST
ENTRY CANOPY
BEYOND
10' - 8"
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
78' - 0"
16' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND
78' - 0"
E GREEN ST
PROPERTY LINE (AFTER DEDICATION)
BUILDING ENVELOPE
8' - 0"
SETBACK
3' - 0" MIN 5' - 0"
STEPBACK DEPTH
8' - 0" MIN
BUILDING ENVELOPE
STEPBACK DEPTH
50' - 0" MIN 4"
BUILDING ENVELOPE
PROPERTY LINE
INTERIOR SETBACK
15' - 0" MIN
MTL-04
MTL-03
CONC-01
CONC-01
GL-05
GL-01
CONC-01
GL-05
GL-01
MTL-02
EIFS-01
MTL-01
CONC-01
SHADE STRUCTURE
11' - 0"
ARCH. PROJECTION
6"
SHADE STRUCTURE
6"
ARCH. PROJECTION
6"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
63' - 0" 15' - 0"
ENTRY CANOPY
BEYOND
MTL-05
STEPBACK HEIGHT
20' - 0"
STEPBACK HEIGHT
51' - 0"
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01 METAL PANEL COLOR 01MTL-02 METAL PANEL COLOR 02
CONC-01 CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS W/ STUCCO
FINISH
MTL-03 MECH SCREEN OPAQUEMTL-04 MECH SCREEN
PERFORATED
MTL-05 CANOPY/TRELLIS
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.102
BUILDING ELEVATIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED BUILDING ELEVATION - WEST / HOLLISTON AVE 01 SCALE: 1/8" = 1'-0" PROPOSED BUILDING ELEVATION - WEST / HOLLISTON AVE (COLOR) 02 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
78' - 0"
16' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND 78' - 0"
OPEN TO BEYOND
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
15' - 0" 63' - 0"
S HOLLISTON AVE
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
78' - 0"
OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND 16' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
78' - 0"
OPEN TO BEYOND
S HOLLISTON AVE
STEPBACK HEIGHT
45' - 0"
PROPERTY LINE
BUILDING ENVELOPE
~8' - 3" - 8' - 6"
8' - 3" (VARIES)
SETBACK
5' - 0" MIN 3' - 0"
STEPBACK
8' - 0" MIN
21' - 7" - 21' - 11"
21' - 7" (VARIES)
6' - 7"
INTERIOR SETBACK
15' - 0" MIN
BUILDING ENVELOPE
PROPERTY LINE
MTL-04
MTL-03
CONC-01
CONC-01
GL-05
GL-01
CONC-01
GL-05
GL-01
MTL-02
EIFS-01
MTL-01
CONC-01
ARCH. PROJECTION
3"
SHADE STRUCTURE
3"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
15' - 0" 63' - 0"
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01 METAL PANEL COLOR 01MTL-02 METAL PANEL COLOR 02
CONC-01 CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS W/ STUCCO
FINISH
MTL-03 MECH SCREEN OPAQUEMTL-04 MECH SCREEN
PERFORATED
MTL-05 CANOPY/TRELLIS
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.103
BUILDING ELEVATIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED BUILDING ELEVATION - SOUTH 01 SCALE: 1/8" = 1'-0" PROPOSED BUILDING ELEVATION - SOUTH (COLOR) 02 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
78' - 0"
16' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND
78' - 0"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
63' - 0" 15' - 0"
E GREEN ST
10' - 8"
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
78' - 0"
OPEN TO BEYOND
16' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
78' - 0"
E GREEN ST
PROPERTY LINE (AFTER DEDICATION)
BUILDING ENVELOPEBUILDING ENVELOPEBUILDING ENVELOPE
PROPERTY LINE
8' - 0"
5' - 0"
SETBACK
3' - 0" MIN
4"
STEPBACK DEPTH
50' - 0" MIN
STEPBACK DEPTH
8' - 0" MIN
INTERIOR SETBACK
15' - 0" MIN
MTL-04
MTL-03
CONC-01
CONC-01
GL-05
GL-01
CONC-01
GL-05
GL-01
MTL-02
EIFS-01
MTL-01
CONC-01
SHADE STRUCTURE
6"
ARCH. PROJECTION
6"
SHADE STRUCTURE
11' - 0"
ARCH. PROJECTION
6"
63' - 0" 15' - 0"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
MTL-05
STEPBACK HEIGHT
20' - 0"
STEPBACK HEIGHT
51' - 0"
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01 METAL PANEL COLOR 01MTL-02 METAL PANEL COLOR 02
CONC-01 CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS W/ STUCCO
FINISH
MTL-03 MECH SCREEN OPAQUEMTL-04 MECH SCREEN
PERFORATED
MTL-05 CANOPY/TRELLIS
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.104
BUILDING ELEVATIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0" PROPOSED BUILDING ELEVATION - EAST 01 SCALE: 1/8" = 1'-0" PROPOSED BUILDING ELEVATION - EAST (COLOR) 02 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
NOT TO SCALE
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
PAS-A4.101
PERSPECTIVE RENDERINGS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
VIEW FROM GREEN ST,
LOOKING SOUTH
BUILDING ENTRY ON
GREEN ST
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
NOT TO SCALE
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
PAS-A4.102
PERSPECTIVE RENDERINGS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
VIEW FROM HOLLISTON AVE,
LOOKING SOUTHEAST
VIEW FROM GREEN ST,
LOOKING EAST
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
NOT TO SCALE
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
PAS-A4.103
PERSPECTIVE RENDERINGS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
VIEW FROM HOLLISTON AVE,
LOOKING NORTH
VIEW FROM HOLLISTON AVE,
LOOKING NORTH
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
NOT TO SCALE
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071 United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950 Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100 Newport Beach, CA 92660
Tel 949.955.3771
PAS-A4.104
PERSPECTIVE RENDERINGS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
VIEW FROM ADJACENT
PARKING LOT,
LOOKING NORTH
VIEW FROM HILL ST & GREEN ST,
LOOKING WEST
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL REVISION 2
12/22/2025 CONCEPT DESIGN REVIEW
CONTINUANCE SUBMITTAL
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
PAS-G0.101
COVER SHEET
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
The Project Site is located at 1364 E Green Street, which consists of 3 parcels, containing 41,573 square feet and is bounded by Holliston Avenue to the west. There is an existing 117 stall surface parking lot that spans all 3 parcels. The proposed project will be a 4-story Multi-tenant Research and Development building, with Lab/Office spaces on the ground level along with 3 subterranean levels of parking.
APN 5736-002-013
SETBACKS 5-10’ FOR 50% ON HOLLISTON
3-8’ FOR 75% ON GREEN STREET
MINIMUM TRANSPARENCY
GREEN ST
OVERALL FACADE REQUIRED 30% MIN
OVERALL FACADE PROPOSED 50%
GROUND FLOOR REQUIRED 70% MIN
GROUND FLOOR PROPOSED 73%
HOLLISTON AVE
OVERALL FACADE REQUIRED 30% MIN
OVERALL FACADE PROPOSED 39%
GROUND FLOOR REQUIRED 70% MIN
GROUND FLOOR PROPOSED 72%
OPEN SPACE REQUIREMENT 60% REDUCTION OF REQUIREMENT FOR R&D PROJECTS COMMON REQUIRED (5% OF GSF) 1,871 SF (93,539 X 5% = 4,677. 4,677 X 40% =1,871) COMMON PROPOSED: 5,917 SF
PAOS REQUIRED (2% OF GSF) 748 SF (93,539 X 2% = 1,871. 1,871 X 40% = 748) PAOS PROPOSED: 1,060 SF
MODULATION
FACADE LENGTH EACH STREET-FACING FACADE EXCEEDING 150'
SHALL INCLUDE A BREAK OF AT LEAST 10% OF THE
FACADE LENGTH OR 20', WHICHEVER IS GREATER
GREEN ST
OVERALL FACADE LENGTH: 177'-0"
MIN REQ. FACADE BREAK LENGTH/DEPTH: 20'-0" / 10'-0"
PROPOSED FACADE BREAK LENGTH/DEPTH: 20'-0" / 15'-0"
HOLLISTON AVE
OVERALL FACADE LENGTH: 177'-0"
MIN REQ. FACADE BREAK LENGTH/DEPTH: 20'-0" / 10'-0"
PROPOSED FACADE BREAK LENGTH/DEPTH: 20'-0" / 10'-0"
FACADE AREA EACH STREET-FACING FACADE EXCEEDING 50' IN
LENGTH SHALL MODULATE A MINIMUM OF 25% OF
THE AREA ABOVE THE FIRST STORY
GREEN ST
PROPOSED PERCENTAGE OF MODULATION 29%
HOLLISTON AVE
PROPOSED PERCENTAGE OF MODULATION 29%
VICINITY MAP
ZONING INFORMATION BUILDING NARRATIVE
ADDITIONAL ZONING INFORMATION
TOTAL AREA OF SITE
GROSS BUILDING AREA CALCULATIONS
SQUARE FOOTAGE - EXISTING
SQUARE FOOTAGE - PROPOSED
NUMBER OF BUILDINGS - EXISTING
NUMBER OF BUILDINGS - PROPOSED
EXISTING BUILDING CONSTRUCTION DATES
VEHICULAR PARKING - EXISTING
VEHICULAR PARKING - MINIMUM REQ. PER CODE *
* PURSUANT TO GOVERNMENT CODE SECTION 65863.2
(AB2097) SINCE THE SITE IS WITHIN ONE-HALF MILE
OF PUBLIC TRANSIT, THE CITY SHALL NOT IMPOSE OR
ENFORCE MINIMUM AUTOMOBILE PARKING ON THE
PROPOSED DEVELOPMENT. WHERE PARKING IS
PROVIDED VOLUNTARILY, SPACES SHALL COMPLY
WITH APPLICABLE REQUIREMENTS OF THE ZONING
CODE.
VEHICULAR PARKING - PROPOSED
BICYCLE PARKING - EXISTING
BICYCLE PARKING - MINIMUM REQ. PER CODE
BICYCLE PARKING - PROPOSED
LOADING SPACES - EXISTING
LOADING SPACES - MINIMUM REQ. PER CODE
LOADING SPACES - PROPOSED
FAR - EXISTING
FAR - MAX ALLOWED PER ZONING CODE
FAR - PROPOSED
BUILDING HEIGHTS & STORIES - EXISTING
BUILDING HEIGHTS & STORIES - PROPOSED
PROPOSED LANDSCAPING
PROPOSED HARDSCAPE/PAVING
EXISTING ZONING AND LAND USE DESIGNATION
COMMERCIAL LAND USE
OCCUPANCY GROUP, CONSTRUCTION - EXISTING
OCCUPANCY GROUP, CONSTRUCTION - PROPOSED
41,573 SF
N/A
93,539 SF
N/A
1 N/A
117
2 PER 1,000 SF = 187 SPACES
ADDITIONAL SPACES ALLOWED BY RIGHT = 93
(187 + 50%); 280 SPACES
261 SPACES
0 5% OF MIN. REQ. VEHICULAR PARKING = 9 SPACES
CLASS 1 (75% OF MIN. REQ.) = 7
CLASS 2 (25% OF MIN. REQ.) = 2
CLASS 1 = 7
CLASS 2 = 2
N/A
1 PER 40,000 SF WHERE GSF IS 40,001 SF AND MORE =
2 SPACES
2 SPACES AT 10' X 20' MIN, 12' VERTICAL CLEARANCE
N/A
2.25 93,539 / 41,573 = 2.25
N/A
63' + 16' MECH SCREEN / 4 STORIES
930 SF
721 SF
EC-MU-N: MIXED-USE NEIGHBORHOOD
RESEARCH & DEVELOPMENT
BUILDING ACTIVITIES AND SERVICES TYPICALLY
INCLUDE OFFICE WORK RELATED TO LAB R&D
S-2, N/A
B, TYPE I-B
SHEET NO. SHEET NAME
00 GENERAL
PAS-G0.101 COVER SHEET
PAS-G0.102 SURVEY
PAS-G0.103 SURVEY/TOPO
PAS-G0.201 GROSS AREA EXHIBIT
PAS-G0.202 OPEN AREA - PAOS EXHIBIT
PAS-G0.203 OPEN AREA - COMMON AREA EXHIBIT
01 CIVIL
PAS-C1.10 EXISTING/DEMO SITE PLAN
03 ARCHITECTURE
PAS-A1.102 PROPOSED SITE PLAN
PAS-A1.102A PROPOSED SITE PLAN - ZONING EXHIBIT
PAS-A1.102B PROPOSED SITE PLAN - FRONTAGE EXHIBIT
PAS-A1.103 PROPOSED CIRCULATION PLAN
PAS-A1.201 PROPOSED FLOOR PLAN - LEVEL 01
PAS-A1.202 PROPOSED FLOOR PLAN - LEVEL 02
PAS-A1.203 PROPOSED FLOOR PLAN - LEVEL 03
PAS-A1.204 PROPOSED FLOOR PLAN - LEVEL 04
PAS-A1.205 PROPOSED FLOOR PLAN - ROOF LEVEL
PAS-A1.205A PROPOSED FLOOR PLAN - ROOF LEVEL - AREA EXHIBIT PAS-A1.B01 PROPOSED FLOOR PLAN - LOWER LEVEL 01
PAS-A1.B02 PROPOSED FLOOR PLAN - LOWER LEVEL 02
PAS-A1.B03 PROPOSED FLOOR PLAN - LOWER LEVEL 03
PAS-A2.101 BUILDING ELEVATIONS
PAS-A2.102 BUILDING ELEVATIONS
PAS-A2.103 BUILDING ELEVATIONS
PAS-A2.104 BUILDING ELEVATIONS
PAS-A2.105 BUILDING ELEVATIONS - SECONDARY
PAS-A2.106 BUILDING ELEVATIONS - MODULATION EXHIBIT
PAS-A2.107 BUILDING ELEVATIONS - TRANSPARENCY EXHIBIT
PAS-A3.101 BUILDING SECTIONS
PAS-A3.102 BUILDING SECTIONS
PAS-A3.103 PARKING RAMP AND CLEARANCES EXHIBIT
PAS-A3.104 VIEW CORRIDOR EXHIBIT
PAS-A4.101 PERSPECTIVE RENDERINGS
PAS-A4.102 PERSPECTIVE RENDERINGS
PAS-A4.103 PERSPECTIVE RENDERINGS
PAS-A4.104 PERSPECTIVE RENDERINGS
PAS-A5.100 SHADOW STUDY
04 LANDSCAPE
L1.001 PLANTING PLAN - LEVEL 01
L1.002 HARDSCAPE PLAN - LEVEL 01
L1.003 TREE DEMOLITION PLAN - LEVEL 01
L1.004 PLANTING PLAN - LEVEL 04
L1.005 HARDSCAPE PLAN - LEVEL 04
SHEET INDEX
GROSS AREA BY FLOOR
AREA SCHEDULE (GROSS FLOOR AREA)
LEVEL NAME AREA
LOWER LEVEL 03
LOWER LEVEL 03 MECH 661 SF
661 SF
LOWER LEVEL 02
LOWER LEVEL 02 MECH 655 SF
655 SF
LOWER LEVEL 01
LOWER LEVEL 01 MECH 2,971 SF
2,971 SF
LEVEL 01
LEVEL 01 GROSS AREA 16,756 SF
LEVEL 01 MECH 1,772 SF
18,528 SF
LEVEL 02
LEVEL 02 GROSS AREA 28,554 SF
LEVEL 02 MECH 1,125 SF
29,678 SF
LEVEL 03
LEVEL 03 GROSS AREA 28,554 SF
LEVEL 03 MECH 1,125 SF
29,678 SF
LEVEL 04
LEVEL 04 GROSS AREA 19,321 SF
LEVEL 04 MECH 1,125 SF
20,446 SF
ROOF LEVEL
ROOF LEVEL ELEVATORS 353 SF
ROOF LEVEL MECH (APPURTENANCE) 1,680 SF
2,034 SF
Grand total 104,651 SF
GROSS FLOOR AREA IS THE TOTAL ENCLOSED AREA OF ALL FLOORS OF A BUILDING MEASURED TO THE
INSIDE FACE OF THE EXTERIOR WALLS INCLUDING HALLS, STAIRWAYS, ELEVATOR SHAFTS AT EACH FLOOR
LEVEL, SERVICE AND MECHANICAL EQUIPMENT ROOMS AND BASEMENT OR ATTIC AREAS HAVING A HEIGHT
OF MORE THAN SEVEN FEET, BUT EXCLUDING AREA USED EXCLUSIVELY FOR PARKING OR LOADING OF VEHICLES OR BICYCLES. GROSS FLOOR AREA SHALL INCLUDE ROOF APPURTENANCES THAT ARE ENCLOSED AND IS SEPARATE FROM FLOOR AREA RATIO (FAR).
FAR EVALUATES ABOVE-GROUND GROSS AREA AND WHEN CALCULATED FOR R&D EXCLUDES FLOOR AREA
DEVOTED TO MECHANICAL SPACE AND APPURTENANCES
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
ATTACHMENT H
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
1/16" = 1'-0"
8/7/2025 6:04:10 PM Autodesk Docs://005.4988.000 TCC E Green St/Caltech Innovation Center - ARCH.rvt PAS-G0.102
SURVEY
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
1/16" = 1'-0"
8/7/2025 6:04:11 PM Autodesk Docs://005.4988.000 TCC E Green St/Caltech Innovation Center - ARCH.rvt PAS-G0.103
SURVEY/TOPO
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
AREA (GSF)
GROSS AREA
MECH
MECH (APPURTENANCE)
ELEVATORS
PARKING (EXCLUDED)
PARKING & LOADING
(EXCLUDED)
LT BICYCLE PARKING
(EXCLUDED)
TERRACE (EXCLUDED)
16560 SF
GROSS AREA
707 SF
MECH
187 SF
MECH
178 SF
MECH
700 SF
MECH
12093 SF
PARKING &
LOADING
(EXCLUDED)
219 SF
LT BICYCLE
PARKING
(EXCLUDED)
196 SF
GROSS AREA
28554 SF
GROSS AREA
518 SF
MECH
177 SF
MECH
194 SF
MECH
236 SF
MECH
28554 SF
GROSS AREA
236 SF
MECH
194 SF
MECH
177 SF
MECH
518 SF
MECH
6212 SF
TERRACE
(EXCLUDED)
236 SF
MECH
194 SF
MECH
177 SF
MECH
518 SF
MECH
19321 SF
GROSS AREA
777 SF
MECH
(APPURTENANCE)
903 SF
MECH
(APPURTENANCE)
353 SF
ELEVATORS
OUTDOOR MECH YARD
(OPEN TO SKY)
35707 SF
PARKING
(EXCLUDED)
268 SF
MECH
89 SF
MECH
304 SF
MECH
35713 SF
PARKING
(EXCLUDED)
266 SF
MECH
89 SF
MECH
300 SF
MECH
33396 SF
PARKING
(EXCLUDED)
272 SF
MECH
166 SF
MECH
905 SF
MECH
605 SF
MECH
368 SF
MECH
300 SF
MECH
266 SF
MECH
89 SF
MECH
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-G0.201
GROSS AREA EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1" = 30'-0"
AREA PLAN (GSF) - LEVEL 01 04
SCALE: 1" = 30'-0"
AREA PLAN (GSF) - LEVEL 02 05
SCALE: 1" = 30'-0"
AREA PLAN (GSF) - LEVEL 03 06
SCALE: 1" = 30'-0"
AREA PLAN (GSF) - LEVEL 04 07
SCALE: 1" = 30'-0"
AREA PLAN (GSF) - ROOF 08
FLOOR AREA RATIO (PMC SECTION 17.31.070.B,
SECTION 17.50.240.C)
MAXIMUM ALLOWABLE FLOOR AREA RATIO (FAR) IS
2.25. GROSS FLOOR AREA
MAXIMUM ALLOWABLE GROSS FLOOR AREA IS
APPROXIMATELY 93,534.75 SQ FT.
THE TOTAL AREA OF THE BUILDING MEASURED
FROM THE INSIDE FACE OF EXTERIOR WALLS.
INCLUDING HALLS, STAIRWAYS, ELEVATOR
SHAFTS, SERVICE AND MECHANICAL ROOMS,
BASEMENT OR ATTIC AREAS HAVING A HEIGHT OF
MORE THAN SEVEN FEET BUT EXCLUDING PARKING
OR LOADING OF VEHICLES OR BICYCLES.
RESEARCH AND DEVELOPMENT FACILITIES SHALL
EXCLUDE MECHANICAL SPACE.
AREA SCHEDULE (GROSS FLOOR AREA)
LEVEL NAME AREA
LOWER LEVEL 03
LOWER LEVEL 03 MECH 661 SF
661 SF
LOWER LEVEL 02
LOWER LEVEL 02 MECH 655 SF
655 SF
LOWER LEVEL 01
LOWER LEVEL 01 MECH 2,971 SF
2,971 SF
LEVEL 01
LEVEL 01 GROSS AREA 16,756 SF
LEVEL 01 MECH 1,772 SF
18,528 SF
LEVEL 02
LEVEL 02 GROSS AREA 28,554 SF
LEVEL 02 MECH 1,125 SF
29,678 SF
LEVEL 03
LEVEL 03 GROSS AREA 28,554 SF
LEVEL 03 MECH 1,125 SF
29,678 SF
LEVEL 04
LEVEL 04 GROSS AREA 19,321 SF
LEVEL 04 MECH 1,125 SF
20,446 SF
ROOF LEVEL
ROOF LEVEL ELEVATORS 353 SF
ROOF LEVEL MECH (APPURTENANCE) 1,680 SF
2,034 SF
Grand total 104,651 SF
SCALE: 1" = 30'-0"
AREA PLAN (GSF) - LOWER LEVEL 03 01
SCALE: 1" = 30'-0"
AREA PLAN (GSF) - LOWER LEVEL 02 02
SCALE: 1" = 30'-0"
AREA PLAN (GSF) - LOWER LEVEL 01 03
AREA SCHEDULE (GROSS FLOOR AREA) - R & D FACILITIES
LEVEL NAME AREA
LEVEL 01 GROSS AREA 16,756 SF
LEVEL 02 GROSS AREA 28,554 SF
LEVEL 03 GROSS AREA 28,554 SF
LEVEL 04 GROSS AREA 19,321 SF
ROOF LEVEL ELEVATORS 353 SF
93,539 SF
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
434 SF
HARDSCAPE
(ENHANCED)
21' - 0"
30' - 7"
AREA (PAOS)
HARDSCAPE (ENHANCED)
LANDSCAPE
SEATING, TYP
142 SF
LANDSCAPE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(E) TREE TO
REMAIN
(E) TREE TO
REMAIN
(E) TREE TO BE
REMOVED
(E) TREE TO BE
REMOVED
8' - 6"
6' - 0"
(N) PROPOSED
TREE
(N) PROPOSED
TREE
1' - 6"
104 SF
LANDSCAPE
104 SF
LANDSCAPE
275 SF
HARDSCAPE
(ENHANCED)
21' - 0"
20' - 0"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-G0.202
OPEN AREA - PAOS EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
GROSS FLOOR AREA (EXCLUDING MECHANICAL AREA): 93,539 SF PUBLICLY ACCESSIBLE OPEN SPACE (PAOS) REQUIRED: 748 SF
PAOS REQUIRED (2% OF GSF, MIN): 1,871 SF (93,539 X 2%)
R&D ALLOWED REQUIREMENT REDUCTION (60% MAX): 748 SF (1,871 X 40%) PAOS PROPOSED: 1,060 SF
SEATING REQUIRED (1 SEAT PER 300 SF REQ. PAOS): 3 (748 / 300) SEATING PROVIDED (1 SEAT PER 24"): 12
LANDSCAPE (% OF PAOS, 25% MIN): 33% (351 / 1,060)
HARDSCAPE (% OF PAOS, 25% MAX STANDARD CONCRETE): 0%
HARDSCAPE, ENHANCED (% OF PAOS): 67% (709 / 1,060)
TREES REQUIRED (1 / 750 SF REQ. PAOS): 1 (748 / 750)
TREES PROVIDED (ONSITE): 6
TREES PROVIDED (OFFSITE): 10* (2 EXISTING, 8 NEW)
* ADHERE TO THE EAST COLORADO SPECIFIC PLAN - PROJECT IS PROVIDING 6 TREES ON HOLLISTON AT 30 FT DISTANCE.
ADHERE TO THE CITY'S APPROVED MASTER STREET PLAN - PROJECT IS PROVIDING 4 MAXIMUM NEW FICUS TREES AT 40 FT DISTANCE.
SEE LANDSCAPE DRAWINGS FOR ADDITIONAL INFORMATION
SCALE: 1" = 10'-0"
AREA PLAN EXHIBIT (PUBLICLY ACCESSIBLE OPEN SPACE) - LEVEL 01 01
AREA SCHEDULE (PAOS)
LEVEL NAME AREA
LEVEL 01 LANDSCAPE 209 SF
LEVEL 01 LANDSCAPE 142 SF
LEVEL 01 HARDSCAPE (ENHANCED) 275 SF
LEVEL 01 HARDSCAPE (ENHANCED) 434 SF
1060 SF
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
3312 SF
HARDSCAPE
(ENHANCED)
AREA (PAOS)
HARDSCAPE (ENHANCED)
LANDSCAPE
15' - 0" 22' - 11"
69' - 0" 30' - 0" 69' - 0"
168' - 0"
2337 SF
LANDSCAPE
267 SF
LANDSCAPE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
37' - 11"37' - 11"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-G0.203
OPEN AREA - COMMON AREA
EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1" = 10'-0"
AREA PLAN (COMMON AREA) - LEVEL 04 01
GROSS FLOOR AREA (EXCLUDING MECHANICAL AREA): 93,539 SF COMMON OPEN SPACE REQUIRED: 1,871 SF
COMMON OPEN SPACE (5% OF GSF, MIN): 4,677 SF (93,539 X 5%) R&D ALLOWED REQUIREMENT REDUCTION (60% MAX): 1,871 SF (4,677 X 40%) COMMON OPEN SPACE PROPOSED: 5,917 SF
LANDSCAPE (% OF COMMON OPEN SPACE, 25% MIN): 44% (2,605 / 5,917) HARDSCAPE (% OF COMMON OPEN SPACE, 25% MAX STANDARD): 0% HARDSCAPE, ENHANCED (% OF COMMON OPEN SPACE): 56% (3,312 / 5,917) TREES REQUIRED (1 PER 500 SF REQ. COMMON SPACE): 4 (1,871 / 500) TREES PROVIDED: 6
SEE LANDSCAPE DRAWINGS FOR ADDITIONAL INFORMATION
AREA SCHEDULE (COMMON AREA)
LEVEL NAME AREA
LEVEL 04 HARDSCAPE (ENHANCED) 3312 SF
LEVEL 04 LANDSCAPE 2605 SF
5917 SF
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
GREEN ST
HOLLISTON AVE
SHEET NOTES
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
8/7/2025 6:04:11 PM Autodesk Docs://005.4988.000 TCC E Green St/Caltech Innovation Center - ARCH.rvt PAS-C1.10
EXISTING/DEMO SITE PLAN
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL 09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
E GREEN STREET
S HOLLISTON AVENUE
(N) PROPOSED
LAB/OFFICE BUILDING
CENTERLINE OF STREET
CENTERLINE OF STREET
(E) WALL TO REMAIN
(E) WALL TO REMAIN
(N) SUBTERRANEAN DRY WELL
(N) TRANSFORMER VAULT
ACCESS HATCH
207' - 0" PROPERTY BOUNDARY
78' - 0" 21' - 0" 78' - 0"
177' - 0" OVERALL BUILDING LENGTH
177' - 0" OVERALL BUILDING LENGTH
201' - 0" PROPERTY BOUNDARY
78' - 0" 21' - 0" 78' - 0"
177' - 0"
177' - 0"
PROPERTY LINE BEFORE DEDICATION
PROPERTY LINE AFTER DEDICATION
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
31' - 8"
LANDSCAPED AREA;
SEE LANDSCAPE DRAWINGS
ONE-WAY DRIVEWAY
10' - 0"
20' - 0"
20' - 0"
10' - 0"
LOADING SPACE 01
LOADING SPACE 02
R 25' - 0"
MIN DRIVEWAY WIDTH
12' - 0"
R 25' - 0"
14' - 0"
1' - 0"
MIN DRIVEWAY WIDTH
12' - 0" 1' - 0"
12'-0" VERTICAL CLEAR
12'-0" VERTICAL CLEAR
EL. ~490.75
+2'-3" ABOVE LOWEST
POINT ON LOT
EL. ~488.50
LOWEST POINT ON LOT
AT BUILDING EDGE
R 25' - 0"
8' - 0" 15' - 1"
8' - 6" 21' - 7"
11' - 6"
CARPOOL /
VANPOOL
LOADING
CARPOOL /
VANPOOL
LOADING
26' - 2"
FIRE ACCESS
5' - 0"
FIRE ACCESS
5' - 0"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.102
PROPOSED SITE PLAN
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1" = 10'-0"
PROPOSED SITE PLAN 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
10' - 0"
5' - 0"
8' - 0"
CURB FACE
AMENITY ZONE
WALK ZONE
PROPERTY LINE
CURB FACE
MIN SETBACK
MAX SETBACK
SIDEWALK LINE
3' - 0" 5' - 0" AMENITY ZONE WALK ZONE
PROPERTY LINE
MIN SETBACK
MAX SETBACK
BELOW-GRADE
PARKING SETBACK
INTERIOR SETBACK
INTERIOR SETBACK
PROPERTY LINE
PROPERTY LINE
15' - 0"
15' - 0"
GREEN ST STEPBACK @ 51' H
8' - 0"
HOLLISTON STEPBACK @ 45' H
SIDEWALK
E GREEN STREET
S HOLLISTON AVENUE
1' - 0"
12' - 0"
7' - 0" 5' - 0"
STREET SETBACK
3' - 0"
8' - 0"
5' - 0"
DEDICATION
50' - 0"
FIREFIGHTER ACCESS PATH
FIREFIGHTER ACCESS PATH
(N) PROPOSED
LAB/OFFICE BUILDING
CENTERLINE OF STREET
CENTERLINE OF STREET
(E) PARISH CENTER
BUILDING
5' - 0"
5' - 0"
FACADE BREAK
GREEN ST STEPBACK @ 20' H
FACADE BREAK
10' - 0"
20' - 0"
20' - 0"
10' - 0"
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(E) TREE TO
REMAIN
(E) TREE TO
REMAIN
(E) TREE TO BE
REMOVED
(E) TREE TO BE
REMOVED
(E) WALL TO REMAIN
(E) WALL TO REMAIN
(N) SUBTERRANEAN DRY WELL
(N) TRANSFORMER VAULT
ACCESS HATCH
207' - 0"
SITE FRONTAGE
________________ 01
PAS-A1.102B
________________ 2
PAS-A1.102B
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(E) CURB CUT TO BE
CLOSED
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.102A
PROPOSED SITE PLAN - ZONING
EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1" = 10'-0"
PROPOSED SITE PLAN - ZONING EXHIBIT 01
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
207' - 0" SITE FRONTAGE
PROPERTY LINE
PROPERTY LINE AFTER 1'-0" DEDICATION
78' - 0" FACADE LENGTH 21' - 0" FACADE BREAK 78' - 0" FACADE LENGTH
E GREEN ST
GREEN ST SITE FRONTAGE: 207'-0"
LINEAL FEET OF BUILDING WITHIN SETBACK RANGE (3'-0" - 8'-0"): 78'-0" + 78'-0" = 156'-0" PROPOSED BUILDING FRONTAGE: 156 / 207 = 75% PROPERTY LINE 1' - 0" MIN SETBACK 3' - 0" MAX SETBACK 8' - 0" 177' - 0" BUILDING FACADE
STEPBACK REQ.
8' - 0"
M
NI S
E
T
B
A
C
K
5' - 0"
M
AX
S
E
T
B
A
C
K
10' - 0"
S HOLLISTON AVE
201' - 0" SITE FRONTAGE
78' - 0" FACADE LENGTH 21' - 0" FACADE BREAK 78' - 0" FACADE LENGTH HOLLISTON AVE SITE FRONTAGE: 201'-0"
LINEAL FEET OF BUILDING WITHIN SETBACK RANGE (5'-0" - 10'-0"): 78'-0" + 78'-0" = 156'-0" PROPOSED BUILDING FRONTAGE: 156 / 201 = 78%
PROPERTY LINE
PROPERTY LINE
177' - 0" BUILDING FACADE
S
T
E
P
B
A
C
K
R
E
Q.
8' - 0"
8' - 6"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.102B
PROPOSED SITE PLAN - FRONTAGE
EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1" = 10'-0"
FRONTAGE EXHIBIT - GREEN ST & HOLLISTON AVE 01
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
E GREEN STREET
S HOLLISTON AVENUE
(N) PROPOSED
LAB/OFFICE BUILDING
CENTERLINE OF STREET
CENTERLINE OF STREET
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(N) PROPOSED
TREE
(E) TREE TO REMAIN
(E) TREE TO
REMAIN
(E) TREE TO BE
REMOVED
(E) TREE TO BE
REMOVED
PARKING RAMP
LOADING
(N) PROPOSED
TREE
(N) PROPOSED
TREE
ONE-WAY DRIVEWAY
PEDESTRIAN
VEHICULAR | TENANT / VISITOR
VEHICULAR | SERVICE
FIRE ACCESS
COMMON USE
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.103
PROPOSED CIRCULATION PLAN
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1" = 10'-0"
PROPOSED CIRCULATION PLAN 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01
PAS-A3.101
________________
01 PAS-A3.102
________________
LOBBY
PAOS
WOMEN
MEN
TENANT
IDF
ELEC
TENANT
LT BICYCLE
PARKING
01 PAS-A2.105 03
PAS-A2.105
07 05
(N) SUBTERRANEAN
DRY WELL
(N) TRANSFORMER VAULT
ACCESS HATCH
GENERATOR
(MECH)
ST BICYCLE PARKING
207' - 0" PROPERTY BOUNDARY
1 3
4 6
2 5
A B C D E F
78' - 0" 21' - 0" 78' - 0"
78' - 0" 21' - 0" 78' - 0"
177' - 0"
177' - 0"
COMMERCIAL TENANT AVERAGE INTERIOR DEPTH
70' - 6"
COMMERCIAL TENANT AVERAGE INTERIOR DEPTH
55' - 9"
COMEMERCIAL TENANT AVERAGE INTERIOR DEPTH
91' - 3"
ENTRY CANOPY OVERHEAD
EL. 490.75
EL. 488.50
4' - 10" 26' - 2"
1' - 6" 10' - 0" 8' - 0" 10' - 0" 1' - 6"
G-09
G-01
01 PAS-A3.103
________________
22' - 0"
PAS-A2.107
01 PAS-A2.107 02
CARPOOL /
VANPOOL
LOADING
REFUSE
STORAGE
8' - 6" 177' - 0" 21' - 7"
15' - 1" 177' - 0" 8' - 0"
201' - 0" PROPERTY BOUNDARY
EL. 488.50
12' - 7"
14' - 0"
7'-0" MIN
VERTICAL
CLEARANCE
NARROWEST INTERIOR DEPTH
26' - 6"
5' - 7" 23' - 8 1/2" 1' - 3 1/2"
1' - 9" 17' - 6" 1' - 9"
1' - 6" 10' - 0" 8' - 0" 10' - 0" 1' - 6" 1' - 6" 10' - 0" 5' - 0" 10' - 0" 4' - 6" 1' - 6" 10' - 6" 5' - 0" 12' - 0" 2' - 0" ADA
STD
ADA
VAN
ADA
STD
ADA
VAN
ADA
STD
ACC
EVCS
AMB
ACC
EVCS
STD
ACC
EVCS
VAN
G-08
G-10
ADA
STD
ADA
STD
18' - 0"
18' - 0"
5' - 0" 9' - 6"
10' - 0" 11' - 6" 4' - 0" 9' - 0"
CARPOOL /
VANPOOL
LOADING
8.0% 16.0% 5.0%
(MIN SLOPE TO DRAIN, 5% MAX)
65' - 0" RAMP
10' - 0" 45' - 0" 10' - 0"
8.0%
EL. 490.75
11' - 6"
LOADING
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.201
PROPOSED FLOOR PLAN - LEVEL 01
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - LEVEL 01 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01
PAS-A3.101
________________
01 PAS-A3.102
________________
TENANT
MEN
ELEC
IDF
WOMEN
MEP TI
(MECH)
01 PAS-A2.105 03
PAS-A2.105
07 05
MECH SHAFT
MECH SHAFT
MECH SHAFT
1 3
4 6
2 5
A B C D E F
PROPERTY BOUNDARY
207' - 0"
PROPERTY BOUNDARY
201' - 0"
10' - 0" CLEAR
78' - 0" 21' - 0" 78' - 0"
78' - 0" 21' - 0" 78' - 0"
15' - 0" CLEAR
177' - 0"
177' - 0"
EL. 505.50
PAS-A2.107
01 PAS-A2.107 02
8' - 6" 177' - 0" 21' - 7"
15' - 1" 177' - 0" 8' - 0"
20' - 0" CLEAR
20' - 0" CLEAR
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.202
PROPOSED FLOOR PLAN - LEVEL 02
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - LEVEL 02 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01
PAS-A3.101
________________
01 PAS-A3.102
________________
01 PAS-A2.105 03
PAS-A2.105
07 05
CIRCULATION
ELEC
MEN
WOMEN
MEP TI
(MECH)
IDF
1 3
4 6
2 5
A B C D E F
MECH SHAFT
MECH SHAFT
MECH SHAFT
PROPERTY BOUNDARY
207' - 0"
PROPERTY BOUNDARY
201' - 0"
10' - 0" CLEAR
78' - 0" 21' - 0" 78' - 0"
78' - 0" 21' - 0" 78' - 0"
177' - 0"
177' - 0"
EL. 520.50
PAS-A2.107
01 PAS-A2.107 02
8' - 6" 177' - 0" 21' - 7"
15' - 1" 177' - 0" 8' - 0"
20' - 0" CLEAR
20' - 0" CLEAR
15' - 0" CLEAR
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.203
PROPOSED FLOOR PLAN - LEVEL 03
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - LEVEL 03 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01
PAS-A3.101
________________
01 PAS-A3.102
________________
MEN
ELEC
IDF
WOMEN
MEP TI
(MECH)
01 PAS-A2.105 03
PAS-A2.105
07 05
MECH SHAFT
MECH SHAFT
MECH SHAFT
1 3
4 6
2 5
A B C D E F
PROPERTY BOUNDARY
207' - 0"
PROPERTY BOUNDARY
201' - 0"
50' - 4" 129' - 1" 20' - 7"
19' - 5" 160' - 7" 27' - 1"
160' - 7 1/2"
EL. 535.50
PROPOSED PLANTING AREA;
SEE LANDSCAPE DRAWINGS
BUILDING EDGE TO ROOF TERRACE
5' - 0" MIN, TYP
TOTAL ROOF AREA: 26,077 SF
AREA OF ROOF DECK: 6,115 SF
COVERAGE OF ROOF DECK: 23%
(60% MAX)
UNOCCUPIED ROOF AREA
ROOF DECK
PAS-A2.107
01 PAS-A2.107 02
20' - 0" CLEAR
20' - 0" CLEAR
13' - 6" 26' - 7"
20' - 1"
46' - 0"
T.O. CANOPY
CANOPY ABOVE CANOPY ABOVE
EL. 546.83
T.O. CANOPY
EL. 546.83
36' - 0"
18' - 0"
36' - 0"
18' - 0"
15' - 0" CLEAR
10' - 0" CLEAR
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.204
PROPOSED FLOOR PLAN - LEVEL 04
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - LEVEL 04 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01
PAS-A3.101
________________
01 PAS-A3.102
________________
MECH
ROOF DRAIN, TYP
MECHANICAL SCREEN
CONCEPTUAL MECHANICAL
EQUIPMENT LAYOUT
PAS-A2.105
07 05
LOCATION OF
LOWEST EXISTING
GRADE ELEVATION
(EL. 488.50)
TOP OF MECH SCREEN
TOP OF PARAPET
FINISH SURFACE AT ROOF
(HIGH POINT; VARIES W/ SLOPE)
MECH
ELEC
1 3
4 6
2 5
A B C D E F
EL. 567.50
EL. 551.25
EL. 551.50
PROPERTY BOUNDARY
207' - 0"
PROPERTY BOUNDARY
201' - 0"
142' - 4" MECH SCREEN
8' - 0" 178' - 0" 21' - 1"
39' - 0" 146' - 6" 14' - 7"
109' - 4" MECH SCREEN
PAS-A2.107
01 PAS-A2.107 02
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.205
PROPOSED FLOOR PLAN - ROOF
LEVEL
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - ROOF LEVEL 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A2.104
PAS-A2.101
01 PAS-A2.102 01
PAS-A2.103
01 01
PAS-A3.101
________________
01 PAS-A3.102
________________
PAS-A2.105
07 05
ROOF AREA: 26,077 SF
MECHANICAL SCREEN
LOCATION OF
LOWEST EXISTING
GRADE ELEVATION
(EL. 488.50)
TOP OF MECH SCREEN
TOP OF PARAPET
TOP OF ELEVATOR
OVERRUN
TOP OF MECH
PENTHOUSE
FINISH FLOOR AT ROOF
(HIGH POINT; VARIES W/ SLOPE)
1 3
4 6
2 5
A B C D E F
EL. 567.50
EL. 551.25
EL. 551.50
EL. 568.75
EL. 558.75
MECH YARD (UNCOVERED)
PAS-A2.107
01 PAS-A2.107 02
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.205A
PROPOSED FLOOR PLAN - ROOF
LEVEL - AREA EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - ROOF LEVEL - AREA EXHIBIT 01
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A3.101
________________
01 PAS-A3.102
________________
MPOE
DOMESTIC
WATER PUMP TRANSFORMER
MAIN
ELECTRICAL
EMERGENCY
ELECTRICAL
EXHAUST FAN
ROOM
MAKEUP AIR
FAN ROOM
IDF
1 3
4 6
2 5
A B C D E F
PROPERTY BOUNDARY
207' - 0"
PROPERTY BOUNDARY
201' - 0"
1' - 0" 204' - 9" 1' - 4"
8' - 0" 183' - 9" 3' - 4"
167' - 0" 16' - 9"
179' - 6" 25' - 3"
BELOW-GRADE SETBACK
5' - 0" MIN
22' - 0"
9' - 0" 22' - 0"
4' - 6" 22' - 0" 4' - 6"
01 PAS-A3.103
________________
B1-01
B1-16
B1-15
B1-27
B1-28
B1-42 B1-55
B1-56 B1-57
B1-66 B1-60
B1-67 B1-69
B1-74
B1-70
B1-75
B1-71 B1-72 B1-73
B1-76
4' - 6" 8' - 6" 8' - 6" 9' - 6" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 8' - 9" 22' - 0" 3"
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 9' - 6" 8' - 6" 9' - 6" 10' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 5' - 3"
B1-41
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0"
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 9' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0"
9' - 6" 8' - 6" 9' - 6"
3' - 0"
TYP
18' - 0"
18' - 0"
17' - 0" 17' - 0"
17' - 0" 17' - 0"
10' - 0" 10' - 0" 10' - 0" 10' - 0" 17' - 0" 17' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
5.0% 8.0% 16.0% 8.0% 5.0%
(MIN SLOPE TO DRAIN, 5% MAX)
22' - 0"
B1-58 B1-59
B1-77
65' - 0" RAMP
(MIN SLOPE TO DRAIN, 5% MAX)
(MIN SLOPE TO DRAIN, 5% MAX)
PARKING
10' - 0" 45' - 0" 10' - 0"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.B01
PROPOSED FLOOR PLAN - LOWER
LEVEL 01
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - LOWER LEVEL 01 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A3.101
________________
01 PAS-A3.102
________________
PARKING
EXHAUST FAN
ROOM
IDF
MAKEUP AIR
FAN ROOM
1 3
4 6
2 5
A B C D E F
PROPERTY BOUNDARY
207' - 0"
PROPERTY BOUNDARY
201' - 0"
1' - 0" 204' - 9" 1' - 4"
8' - 0" 183' - 9" 3' - 4"
167' - 0" 16' - 9"
179' - 6" 25' - 3"
BELOW-GRADE SETBACK
5' - 0" MIN
9' - 0" 22' - 0"
01 PAS-A3.103
________________
10' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 17' - 0" 17' - 0" 4' - 6" 22' - 0" 4' - 6"
4' - 6" 8' - 6" 8' - 6" 9' - 6" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 8' - 9" 22' - 0" 3"
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 9' - 6" 8' - 6" 9' - 6" 10' - 0" 9' - 0" 5' - 3"
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0"
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 9' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0"
9' - 6" 8' - 6" 9' - 6"
3' - 0"
TYP
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
22' - 0"
10' - 0" 10' - 0" 17' - 0" 17' - 0"
1' - 0" 10' - 0" 9' - 0"
B2-01
B2-16
B2-15
B2-27
B2-28
B2-44 B2-59
B2-60 B2-61
B2-70 B2-64
B2-71 B2-73
B2-80
B2-74
B2-81
B2-75 B2-76 B2-77
B2-82
B2-43
B2-62 B2-63
B2-83
B2-78 B2-79
B2-84 B2-85
22' - 0" 5.0% 8.0% 16.0% 8.0% 5.0%
(MIN SLOPE TO DRAIN, 5% MAX)
(MIN SLOPE TO DRAIN, 5% MAX)
(MIN SLOPE TO DRAIN, 5% MAX)
65' - 0" RAMP
10' - 0" 45' - 0" 10' - 0"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.B02
PROPOSED FLOOR PLAN - LOWER
LEVEL 02
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - LOWER LEVEL 02 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
01 PAS-A3.101
________________
01 PAS-A3.102
________________
EXHAUST FAN
ROOM
IDF
MAKEUP AIR
FAN ROOM
PARKING
1 3
4 6
2 5
A B C D E F
PROPERTY BOUNDARY
207' - 0"
PROPERTY BOUNDARY
201' - 0"
1' - 0" 204' - 9" 1' - 4"
8' - 0" 183' - 9" 3' - 4"
167' - 0" 16' - 9"
179' - 6" 25' - 3"
BELOW-GRADE SETBACK
5' - 0" MIN
9' - 0" 22' - 0"
01 PAS-A3.103
________________
10' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 17' - 0" 17' - 0" 4' - 6" 22' - 0" 4' - 6"
4' - 6" 8' - 6" 8' - 6" 9' - 6" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 8' - 9" 22' - 0" 3"
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 9' - 6" 8' - 6" 9' - 6" 10' - 0" 10' - 0" 4' - 3"
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0"
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 9' - 0" 10' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 3" 10' - 0" 9' - 0" 10' - 0" 1' - 0"
9' - 6" 8' - 6" 9' - 6"
3' - 0"
TYP
18' - 0"
18' - 0"
18' - 0" 18' - 0"
18' - 0"
22' - 0"
10' - 0" 10' - 0" 17' - 0" 17' - 0"
1' - 0" 10' - 0" 9' - 0"
8.0% 5.0%
(MIN SLOPE TO DRAIN, 5% MAX)
(MIN SLOPE TO DRAIN, 5% MAX)
(MIN SLOPE TO DRAIN, 5% MAX)
16.0%
B3-01
B3-16
B3-15
B3-27
B3-28
B3-44 B3-59
B3-60 B3-61
B3-62
B3-75 B3-77
B3-84
B3-78
B3-85
B3-79 B3-80 B3-81
B3-86
B3-43
B3-74
B3-87
B3-82 B3-83
B3-88 B3-89
1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 1' - 0" 10' - 0" 9' - 0" 10' - 0" 1' - 0" 10' - 0" 10' - 0" 17' - 0" 17' - 0"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A1.B03
PROPOSED FLOOR PLAN - LOWER
LEVEL 03
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED FLOOR PLAN - LOWER LEVEL 03 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
79' - 0"
63' - 0" 16' - 0"
S HOLLISTON AVE
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
10' - 5"
10' - 8"10' - 8"
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
79' - 0"
MTL-04
MTL-03
CONC-01
CONC-01
GL-05
GL-01
CONC-01
GL-05
GL-01
MTL-02
EIFS-01
MTL-01
CONC-01
PROPERTY LINE
BUILDING ENVELOPE
~8' - 3" - 8' - 6"
8' - 3" (VARIES)
STEPBACK DEPTH
8' - 0" MIN STEPBACK HEIGHT 45' - 0"
~21' - 7" - 21' - 11"
21' - 7" (VARIES)
PROPERTY LINE
S HOLLISTON AVE
BUILDING ENVELOPE
3' - 3"
SETBACK
5' - 0" MIN
ARCH. PROJECTION
3"
INTERIOR SETBACK
15' - 0" MIN 6' - 7"
SHADE STRUCTURE
3"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
MTL-05 MTL-05
MTL-05
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01
METAL PANEL
COLOR 01
MTL-02
METAL PANEL
COLOR 02
CONC-01
CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS
W/ STUCCO
FINISH
MTL-03
MECH SCREEN
OPAQUE
MTL-04
MECH SCREEN
PERFORATED
MTL-05
CANOPY/TRELLIS
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.101
BUILDING ELEVATIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING ELEVATION - NORTH / GREEN ST 01
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING ELEVATION - NORTH / GREEN ST (COLOR) 02 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND
79' - 0"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
63' - 0" 16' - 0"
E GREEN ST
ENTRY CANOPY
BEYOND
10' - 8"
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND
79' - 0"
E GREEN ST
PROPERTY LINE (AFTER DEDICATION)
BUILDING ENVELOPE
8' - 0"
SETBACK
3' - 0" MIN 5' - 0"
STEPBACK DEPTH
8' - 0" MIN
BUILDING ENVELOPE
STEPBACK DEPTH
50' - 0" MIN 4"
BUILDING ENVELOPE
PROPERTY LINE
INTERIOR SETBACK
15' - 0" MIN
MTL-04
MTL-03
CONC-01
CONC-01
GL-05
GL-01
CONC-01
GL-05
GL-01
MTL-02
EIFS-01
MTL-01
CONC-01
SHADE STRUCTURE
11' - 0"
ARCH. PROJECTION
6"
SHADE STRUCTURE
6"
ARCH. PROJECTION
6"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
63' - 0" 16' - 0"
ENTRY CANOPY
BEYOND
MTL-05
STEPBACK HEIGHT
20' - 0"
STEPBACK HEIGHT
51' - 0"
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01
METAL PANEL
COLOR 01
MTL-02
METAL PANEL
COLOR 02
CONC-01
CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS
W/ STUCCO
FINISH
MTL-03
MECH SCREEN
OPAQUE
MTL-04
MECH SCREEN
PERFORATED
MTL-05
CANOPY/TRELLIS
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.102
BUILDING ELEVATIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING ELEVATION - WEST / HOLLISTON AVE 01
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING ELEVATION - WEST / HOLLISTON AVE (COLOR) 02 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND 79' - 0"
OPEN TO BEYOND
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
16' - 0" 63' - 0"
S HOLLISTON AVE
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND OPEN TO BEYOND 17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
79' - 0"
OPEN TO BEYOND
S HOLLISTON AVE
STEPBACK HEIGHT
45' - 0"
PROPERTY LINE
BUILDING ENVELOPE
~8' - 3" - 8' - 6"
8' - 3" (VARIES)
SETBACK
5' - 0" MIN 3' - 0"
STEPBACK
8' - 0" MIN
21' - 7" - 21' - 11"
21' - 7" (VARIES)
6' - 7"
INTERIOR SETBACK
15' - 0" MIN
BUILDING ENVELOPE
PROPERTY LINE
MTL-04
MTL-03
CONC-01
CONC-01
GL-05
GL-01
CONC-01
GL-05
GL-01
MTL-02
EIFS-01
MTL-01
CONC-01
ARCH. PROJECTION
3"
SHADE STRUCTURE
3"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
16' - 0" 63' - 0"
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01
METAL PANEL
COLOR 01
MTL-02
METAL PANEL
COLOR 02
CONC-01
CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS
W/ STUCCO
FINISH
MTL-03
MECH SCREEN
OPAQUE
MTL-04
MECH SCREEN
PERFORATED
MTL-05
CANOPY/TRELLIS
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.103
BUILDING ELEVATIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING ELEVATION - SOUTH 01
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING ELEVATION - SOUTH (COLOR) 02
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND
79' - 0"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
63' - 0" 16' - 0"
E GREEN ST
10' - 8"
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
OPEN TO BEYOND
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
79' - 0"
E GREEN ST
PROPERTY LINE (AFTER DEDICATION)
BUILDING ENVELOPEBUILDING ENVELOPEBUILDING ENVELOPE
PROPERTY LINE
8' - 0"
5' - 0"
SETBACK
3' - 0" MIN
4"
STEPBACK DEPTH
50' - 0" MIN
STEPBACK DEPTH
8' - 0" MIN
INTERIOR SETBACK
15' - 0" MIN
MTL-04
MTL-03
CONC-01
CONC-01
GL-05
GL-01
CONC-01
GL-05
GL-01
MTL-02
EIFS-01
MTL-01
CONC-01
SHADE STRUCTURE
6"
ARCH. PROJECTION
6"
SHADE STRUCTURE
11' - 0"
ARCH. PROJECTION
6"
63' - 0" 16' - 0"
LOWEST ELEVATION AT
EXISTING GRADE (488.50)
MTL-05
STEPBACK HEIGHT
20' - 0"
STEPBACK HEIGHT
51' - 0"
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01
METAL PANEL
COLOR 01
MTL-02
METAL PANEL
COLOR 02
CONC-01
CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS
W/ STUCCO
FINISH
MTL-03
MECH SCREEN
OPAQUE
MTL-04
MECH SCREEN
PERFORATED
MTL-05
CANOPY/TRELLIS
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.104
BUILDING ELEVATIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING ELEVATION - EAST 01
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING ELEVATION - EAST (COLOR) 02
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
15' - 0" 15' - 0" 17' - 0"
1 LEVEL 01
0' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
15' - 0" 15' - 0" 17' - 0"
LEVEL 01
0' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
15' - 0" 15' - 0" 17' - 0"
1 LEVEL 01
0' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
15' - 0" 15' - 0" 17' - 0"
GL-01
LAMINATED IGU
VISION GLASS
GL-05
LAMINATED IGU
SPANDREL GLASS
MTL-01
METAL PANEL
COLOR 01
MTL-02
METAL PANEL
COLOR 02
CONC-01
CONCRETE
SKIM COAT
EIFS-01
EXTERIOR
INSULATION AND
FINISH SYTEMS
W/ STUCCO
FINISH
MTL-03
MECH SCREEN
OPAQUE
MTL-04
MECH SCREEN
PERFORATED
MTL-05
CANOPY/TRELLIS
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
15' - 0" 15' - 0" 15' - 0" 17' - 0"
A
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0"
A
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0"
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
15' - 0" 15' - 0" 15' - 0" 17' - 0"
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.105
BUILDING ELEVATIONS -
SECONDARY
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PARTIAL ELEV - NORTH / WEST 01
SCALE: 1/8" = 1'-0"
PARTIAL ELEV - NORTH / WEST (COLOR) 02
SCALE: 1/8" = 1'-0"
PARTIAL ELEV - NORTH / EAST 03
SCALE: 1/8" = 1'-0"
PARTIAL ELEV - NORTH / EAST (COLOR) 04
SCALE: 1/8" = 1'-0"
PARTIAL ELEV - WEST / NORTH 07 SCALE: 1/8" = 1'-0"PARTIAL ELEV - WEST / SOUTH 05 SCALE: 1/8" = 1'-0"
PARTIAL ELEV - WEST / SOUTH (COLOR)
SCALE: 1/8" = 1'-0" 06 PARTIAL ELEV - WEST / NORTH (COLOR) 08 08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
79' - 0"
S HOLLISTON AVE
GREEN ST
FACADE A
FACADE AREA: 2,449 SF
MODULATED AREA: 713 SF
MODULATION PERCENTAGE (25% MIN): 29%
FACADE B
FACADE AREA: 2,449 SF
MODULATED AREA: 713 SF
MODULATION PERCENTAGE (25% MIN): 29%
FACADE A FACADE B
79' - 0"
FACADE BREAK
79' - 0" 20' - 0"
31' - 0"31' - 0"
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND
79' - 0"
E GREEN ST
HOLLISTON AVE
FACADE C
FACADE AREA: 2,449 SF
MODULATED AREA: 713 SF
MODULATION PERCENTAGE (25% MIN): 29%
FACADE D
FACADE AREA: 2,449 SF
MODULATED AREA: 713 SF
MODULATION PERCENTAGE (25% MIN): 29%
FACADE C FACADE D
79' - 0"
FACADE BREAK
20' - 0" 79' - 0"
31' - 0"31' - 0"
SEE DETAIL, TYP
FACADE AREA
PRIMARY FACADE PLANE
MODULATED AREA
GREEN ST
HOLLISTON AVE
24"
INT EXT
PILASTER
BEYOND
TYPICAL MODULATION DETAIL
PRIMARY
FACADE PLANE
MODULATION
PLANE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.106
BUILDING ELEVATIONS -
MODULATION EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
MODULATION EXHIBIT - NORTH / GREEN ST 02
SCALE: 1/8" = 1'-0"
MODULATION EXHIBIT - WEST / HOLLISTON AVE 01
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
79' - 0"
GREEN ST
OVERALL
FACADE AREA: 10,094 SF - 100%
TRANSPARENT AREA (30% MIN): 5,096 SF - 50%
GROUND FLOOR
FACADE AREA 1,400 SF - 100%
TRANSPARENT AREA (70% MIN) 1,018 SF - 73% 2' - 0" 10' - 0" LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
T.O. MEP SCREEN
79' - 0"
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0"
OPEN TO BEYOND
79' - 0"
HOLLISTON AVE
OVERALL
FACADE AREA: 9,516 SF - 100%
TRANSPARENT AREA (30% MIN): 3,745 SF - 39%
GROUND FLOOR
FACADE AREA: 1,106 SF - 100%
TRANSPARENT AREA (70% MIN): 796 SF - 72% 2' - 0" 10' - 0"
TRANSPARENT AREA - OVERALL
FACADE AREA - GROUND FLOOR
FACADE AREA - OVERALL
TRANSPARENT AREA - GROUND FLOOR
GREEN ST
HOLLISTON AVE
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A2.107
BUILDING ELEVATIONS -
TRANSPARENCY EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
TRANSPARENCY EXHIBIT - NORTH / GREEN ST 01
SCALE: 1/8" = 1'-0"
TRANSPARENCY EXHIBIT - WEST / HOLLISTON AVE 02
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
LOWER LEVEL 01
-10' - 0"
LOWER LEVEL 02
-19' - 6"
T.O. MEP SCREEN
79' - 0"
LOWER LEVEL 03
-29' - 0"
01 PAS-A3.102
________________
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0" 10' - 0" 9' - 6" 9' - 6" TENANT
TENANT
TENANT
LOADING DOCK
DRIVEWAY
STAIR
STAIR
STAIR
STAIR
STAIR
STAIR
STAIR
TENANT TERRACE
TENANT
TENANT
LOBBY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
CORRIDOR
MECHANICAL YARD
MECHANICAL
PLANTER
MECHANICAL SCREEN
MECH
SHAFT
6 5 4 3 2 1
63' - 0" 16' - 0"
EL. 490.50
15' - 0"
EL. 488.50
LOWEST ELEVATION AT
EXISTING GRADE
ELEVATION AT SIDEWALK
NEAREST ENTRANCE
MECH PLENUM (ANTICIPATED) MECH PLENUM (ANTICIPATED)
MECH PLENUM (ANTICIPATED) MECH PLENUM (ANTICIPATED)
MECH PLENUM (ANTICIPATED) MECH PLENUM (ANTICIPATED)
MECH PLENUM (ANTICIPATED)
EL. 490.75
3'-0" - 4'-0" TYP
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A3.101
BUILDING SECTIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING SECTION - N-S 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
ROOF LEVEL
62' - 0"
LEVEL 04
47' - 0"
LEVEL 03
32' - 0"
LEVEL 02
17' - 0"
LOWER LEVEL 01
-10' - 0"
LOWER LEVEL 02
-19' - 6"
T.O. MEP SCREEN
79' - 0"
LOWER LEVEL 03
-29' - 0"
01 PAS-A3.101
________________
17' - 0" 15' - 0" 15' - 0" 15' - 0" 17' - 0" 10' - 0" 9' - 6" 9' - 6"
MECHANICAL YARD
STAIR
TENANT
IDF VESTIBULE ELEV
LOBBY
CORRIDOR
TENANT
STAIR
TENANT
IDF VESTIBULE ELEV
LOBBY
CORRIDOR
MECHANICAL TENANT
STAIR
TENANT
IDF VESTIBULE ELEV
LOBBY
CORRIDOR
TENANT
STAIR
TENANT
IDF ELEV LOBBY CORRIDOR
PARKING RAMP
BOH
PARKING IDF ELEV LOBBY PARKING EXHAUST
FAN ROOM
EMERGENCY
ELECTRICAL
PARKING IDF ELEV LOBBY PARKING EXHAUST
FAN ROOM
PARKING
PARKING IDF ELEV LOBBY PARKING EXHAUST
FAN ROOM
PARKING
MECHANICAL
MECHANICAL SCREEN MECHANICAL YARD MECHANICAL SCREEN
DRIVEWAY
STAIR
STAIR
STAIR
STAIR
A B C D E F
01 PAS-A3.103
________________
16' - 0" 63' - 0"
MECH SHAFT
EL. 488.50
LOWEST ELEVATION AT
EXISTING GRADE
MECH PLENUM (ANTICIPATED) MECH PLENUM (ANTICIPATED)
MECH PLENUM (ANTICIPATED) MECH PLENUM (ANTICIPATED)
MECH PLENUM (ANTICIPATED) MECH PLENUM (ANTICIPATED)
MECH PLENUM (ANTICIPATED)
3'-0" - 4'-0" TYP
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A3.102
BUILDING SECTIONS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PROPOSED BUILDING SECTION - E-W 01
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
LEVEL 01
0' - 0"
LEVEL 02
17' - 0"
LOWER LEVEL 01
-10' - 0"
LOWER LEVEL 02
-19' - 6"
LOWER LEVEL 03
-29' - 0"
01 PAS-A3.102
________________
6 5 4 3 2 1 MIN 13' - 6" CLEARANCE CLEARANCE MIN 8' - 2" CLEARANCE MIN 8' - 2" CLEARANCE MIN 8' - 2" CLEARANCE MIN 8' - 2" CLEARANCE MIN 8' - 2" CLEARANCE MIN 8' - 2"
DRIVEWAY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
TENANT
12' - 0"
TYP LOADING SPACE
10' - 0" 45' - 0" 10' - 0"
65' - 0" RAMP
5.0%
5.0%
5.0%
15' - 3"
5' - 0"
5' - 0"
16.0%
16.0%
16.0%
8.0%
8.0%
8.0%
8.0%
8.0%
8.0%
8' - 9"
5.0%
8' - 9"
8' - 9"
5.0%
5.0%
GREEN ST
HOLLISTON AVE
LEVEL 01
0' - 0"
LEVEL 02
17' - 0"
01 PAS-A3.102
________________
1 2 3 4 5 6 CLEARANCE MIN 13' - 6"
VEHICLE ENTRANCE
LEVEL 01
0' - 0"
LEVEL 02
17' - 0"
01 PAS-A3.102
________________
6 5 4 3 2 1 CLEARANCE MIN 13' - 6"
VEHICLE ENTRANCE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A3.103
PARKING RAMP AND CLEARANCES
EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1/8" = 1'-0"
PARKING RAMP SECTION 01
SCALE: 1/8" = 1'-0"
VEHICLE ENTRANCE ON HOLLISTON AVE 02
SCALE: 1/8" = 1'-0"
VEHICLE ENTRANCE AT DRIVEWAY ON BLDG EAST 03
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
GREEN ST
HOLLISTON AVE
LEVEL 01
0' - 0"
LEVEL 02
17' - 0"
VEHICLE ENTRANCE /
ONE-WAY
DRIVEWAY
PROPERTY LINE
VIEW CORRIDOR
50' - 0"
VIEW CORRIDOR
26' - 4"
2' - 6"
MAX
2' - 6"
MAX
LEVEL 01
0' - 0"
LEVEL 02
17' - 0"
VIEW CORRIDOR
50' - 0"
DRIVEWAY
PROPERTY LINE
2' - 6"
MAX
E GREEN STREET
DRIVEWAY
50' - 0"
5' - 0" MIN
VIEW CORRIDOR
PROPERTY LINE (AFTER DEDICATION)
PROPERTY LINE
ONE
-WAY DRIVEWAY
26' - 11" 50' - 0"
S HOLLISTON AVE
PROPERTY LINE
VIEW CORRIDOR
PROPOSED LANDSCAPING
SHEET NOTES
LEGEND
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
As indicated
PAS-A3.104
VIEW CORRIDOR EXHIBIT
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 3/16" = 1'-0"
VIEW CORRIDOR EXHIBIT - HOLLISTON AVE 01
SCALE: 3/16" = 1'-0"
VIEW CORRIDOR EXHIBIT - GREEN ST 02
SITE PLAN - VIEW CORRIDOR - GREEN ST
ELEVATION - VIEW CORRIDOR - GREEN ST
SITE PLAN - VIEW CORRIDOR - HOLLISTON AVE
ELEVATION - VIEW CORRIDOR - HOLLISTON AVE
GREEN ST
VIEW CORRIDOR AREA 132 SF 100%
LANDSCAPED AREA (50% MIN) 78 SF 59%
HOLLISTON AVE
VIEW CORRIDOR AREA 221 SF 100%
LANDSCAPED AREA (50% MIN) 155 SF 70%
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
NOT TO SCALE
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
PAS-A4.101
PERSPECTIVE RENDERINGS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
VIEW FROM GREEN ST,
LOOKING SOUTH
BUILDING ENTRY ON
GREEN ST
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
NOT TO SCALE
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
PAS-A4.102
PERSPECTIVE RENDERINGS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
VIEW FROM HOLLISTON AVE,
LOOKING SOUTHEAST
VIEW FROM GREEN ST,
LOOKING EAST
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
NOT TO SCALE
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
PAS-A4.103
PERSPECTIVE RENDERINGS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
VIEW FROM HOLLISTON AVE,
LOOKING NORTH
VIEW FROM HOLLISTON AVE,
LOOKING NORTH
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
GREEN ST
HOLLISTON AVE
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
NOT TO SCALE
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
PAS-A4.104
PERSPECTIVE RENDERINGS
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
VIEW FROM ADJACENT
PARKING LOT,
LOOKING NORTH
VIEW FROM HILL ST & GREEN ST,
LOOKING WEST
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
N
E
S
W
8:03 PM 5:46 AM
9:00 AM
June 21
N
E
S
W
8:03 PM 5:46 AM
12:00 PM
June 21
N
E
S
W
8:03 PM 5:46 AM
3:00 PM
June 21
N
E
S
W
6:48 PM 6:43 AM
9:00 AM
September 21
N
E
S
W
6:48 PM 6:43 AM
12:00 PM
September 21
N
E
S
W
6:48 PM 6:43 AM
3:00 PM
September 21
N
E
S
W
5:42 PM 7:59 AM
9:00 AM December 21
N
E
S
W
5:42 PM 7:59 AM
12:00 PM
December 21
N
E
S
W
5:42 PM 7:59 AM
3:00 PM
December 21
SHEET NOTES
GENERAL NOTES
KEY PLAN
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
1" = 100'-0"
PAS-A5.100
SHADOW STUDY
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
SCALE: 1" = 100'-0"
SHADOW STUDY - JUNE 21 @ 9AM 1
SCALE: 1" = 100'-0"
SHADOW STUDY - JUNE 21 @ 12PM 2
SCALE: 1" = 100'-0"
SHADOW STUDY - JUNE 21 @ 3PM 3
SCALE: 1" = 100'-0"
SHADOW STUDY - MAR/ SEP 21 @ 9AM 4
SCALE: 1" = 100'-0"
SHADOW STUDY - MAR/ SEP 21 @ 12PM 5
SCALE: 1" = 100'-0"
SHADOW STUDY - MAR/ SEP 21 @ 3PM 6
SCALE: 1" = 100'-0"
SHADOW STUDY - DEC 21 @ 9AM 7
SCALE: 1" = 100'-0"
SHADOW STUDY - DEC 21 @ 12PM 8
SCALE: 1" = 100'-0"
SHADOW STUDY - DEC 21 @ 3PM 9
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
11/3/2025 1:20:15 PM Autodesk Docs://005.4988.000 TCC E Green St/Caltech Innovation Center - ARCH.rvt L1.001
PLANTING PLAN - LEVEL 01
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
S Holliston Ave
Green Street
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
Trees
Tristaniopsis laurina ‘Elegant’
Zamia
furfuracia
Clivia
miniata ‘Yellow’
Ophiopogon
planiscapus ‘Nigrescens’
Philodendron
xanadu
Lomandra
longifolia ‘Breeze’
Achillea
millefolium
Westringia
fruticosa ‘White’
Mahonia
eurybracteata
‘Soft Caress’
Carex
tumulicola
Yucca
recurvifolia
Liriope
muscari ‘Majestic’
Heuchera
‘Opal’
Alsophila australis
Small Screening Trees
ON-SITE LEVEL 01 LANDSCAPE
Groundcovers
Shrubs & Grasses
Building Entries, typical
Service Dock
Entry Plaza w/ Enhanced Paving
Ficus Trees
@ 40’ o.c.
Public Art Opportunity Parking/ Loading
Exit
Incense Cedar
Trees
@ 30’ o.c.
Seating Area
Loading/Parking Access
5’ Wide Fire Access Path
(2) Bike Parking
Bench
Bench
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
11/3/2025 1:20:15 PM Autodesk Docs://005.4988.000 TCC E Green St/Caltech Innovation Center - ARCH.rvt L1.001
PLANTING PLAN - LEVEL 01
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
Standard Concrete
Vehicular Concrete
Decorative Concrete Paver 1
Decorative Concrete Paver 2
Decorative Concrete Paver 3
Stabilized Decomposed Granite
Gravel
S Holliston Ave
Green Street
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
Building Entries, typical
Service Dock
Entry Plaza w/ Enhanced Paving
Public Art Opportunity Parking/ Loading
Exit
Seating Area
Loading/Parking Access
5’ Wide Fire Access Path
(2) Bike Parking
Bench
Bench
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
11/3/2025 1:20:15 PM Autodesk Docs://005.4988.000 TCC E Green St/Caltech Innovation Center - ARCH.rvt L1.001
PLANTING PLAN - LEVEL 01
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
Tree
No.
Botanical Name Common Name Impact
1 Washingtonia filifera California fan
palm
No Impact - Protect in
Place
2 Calocedrus decurrens Incense cedar No Impact - Protect in Place
3 Washingtonia filifera California fan
palm
Remove
4 Calocedrus decurrens Incense cedar Remove
S Holliston Ave
Green Street
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
(N) Proposed Trees
(E) Trees To Remain
(E) Trees To Be Removed
(E)
(E) Trees To Be Removed
(E) Trees To Remain
(N) Proposed Trees
1 2
34 SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
11/3/2025 1:20:15 PM Autodesk Docs://005.4988.000 TCC E Green St/Caltech Innovation Center - ARCH.rvt L1.001
PLANTING PLAN - LEVEL 01
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
Trees
Tristaniopsis laurina ‘Elegant’
Zamia
furfuracia
Clivia
miniata ‘Yellow’
Ophiopogon
planiscapus ‘Nigrescens’
Philodendron
xanadu
Lomandra
longifolia ‘Breeze’
Achillea
millefolium
Westringia
fruticosa ‘White’
Mahonia
eurybracteata
‘Soft Caress’
Carex
tumulicola
Yucca
recurvifolia
Liriope
muscari ‘Majestic’
Heuchera
‘Opal’
Alsophila australis
Small Screening Trees
ON-SITE LEVEL 01 LANDSCAPE
Groundcovers
Shrubs & Grasses
Shade Structure
Re-Charge Areas Working Tables
Shade Structure
Re-Charge Areas
Building Entries, typical
Seating Terrace
Planter
SHEET NOTES
LEGEND
VICINITY MAP
© Gensler
Date Description
Project Name
Project Number
Description
Scale
Seal / Signature
2025
2221 Rosecrans Ave
Suite 200
El Segundo, CA 90245
Tel 310.363.4700
NOT FOR
CONSTRUCTION
Tel 213.327.3600
Fax 213.327.3601
500 South Figueroa Street
Los Angeles, California 90071
United States
SAIFUL BOUQUET
STRUCTURAL ENGINEERS
725 S Figueroa St
37th Floor
Los Angeles, CA 90017
Tel 213.315.2277
Trammell Crow Company
EXP
330 N Brand Blvd
#950
Glendale, CA 91203
Tel 818.539.1110
KPFF
700 S Flower St
Suite 2100
Los Angeles, CA 90017
Tel 213.418.0201
SWA
811 W 7th St
8th Floor
Los Angeles, CA 90017
Tel 213.236.9090
DPR CONSTRUCTION
4665 MacArthur Ct
Suite 100
Newport Beach, CA 92660
Tel 949.955.3771
11/3/2025 1:20:15 PM Autodesk Docs://005.4988.000 TCC E Green St/Caltech Innovation Center - ARCH.rvt L1.001
PLANTING PLAN - LEVEL 01
05.4988.000
CALTECH INNOVATION
CENTER
CALTECH
INNOVATION
CENTER
1364 East Green Street
Pasadena, CA 91106
08/08/2025 CONCEPT DESIGN REVIEW SUBMITTAL
09/18/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION
11/05/2025 CONCEPT DESIGN REVIEW SUBMITTAL
REVISION 2
Decorative C.I.P. Paving 1
Decorative C.I.P. Paving 2
ATTACHMENT I
Please click link below for the 2022 East Colorado Specific Plan Private Realm Design Guidelines:
https://www.cityofpasadena.net/planning/wp-content/uploads/sites/30/East-ColoradoSpecific-Plan.pdf?v=1770675854797 Please click link below for the Design Guidelines for Neighborhood Commercial & MultiFamily Residential Districts:
https://www.cityofpasadena.net/planning/wp-content/uploads/sites/30/NeighborhoodCommercial-and-Multi-family-Residential-Districts.pdf?v=1770675848137 1364 E. Green
Street
Final Local Mobility Analysis Report
Prepared for:
City of Pasadena
Submitted on:
December 4, 2025
ATTACHMENT J
2 Table of Contents
1. Introduction ................................................................................................................................4
1.1 Project Description ..............................................................................................................................................4
2. Existing Transportation Network............................................................................................. 6
2.1 Existing Street System .......................................................................................................................................6
2.2 Existing Transit Service ....................................................................................................................................8
3. Proposed Project Traffic........................................................................................................... 9
4. Intersection Operational Analysis............................................................................................11
4.1 Analysis Methodology........................................................................................................................................11
4.1.1 Intersection Thresholds of Significance / Caps ...............................................................................12
4.2 Study Area, Analysis Scenarios, and Existing Volumes..........................................................................12
4.2.1 Existing Traffic Volumes........................................................................................................................12
4.3 Intersection Level of Service Analysis.........................................................................................................15
4.3.1 Existing Conditions.................................................................................................................................15
4.3.2 Existing Plus Project Conditions........................................................................................................16
4.3.3 Future Baseline Conditions.................................................................................................................21
4.3.4 Future with Project Conditions.........................................................................................................23
4.4 Off-Site Queuing Analysis............................................................................................................................ 25
5. Active Transportation Assessment ....................................................................................... 27
5.1 Existing Pedestrian Infrastructure.................................................................................................................29
5.2 Existing Bicycle Facilities...............................................................................................................................29
5.3 Existing Transit Amenities ............................................................................................................................ 30
5.4 Intersections..................................................................................................................................................... 30
5.5 Assessment.........................................................................................................................................................31
6. Conclusions .............................................................................................................................32 Appendices
Appendix A. Traffic Count Data
Appendix B. LOS Calculation Sheets
Appendix C. Queuing Calculation Sheets
3 List of Figures
Figure 1. Project Site Plan ...............................................................................................................................................5 Figure 2. Roadway Classifications ...............................................................................................................................7 Figure 3. Project Location and Study Intersections ...............................................................................................13 Figure 4. Peak Hour Traffic Volumes and Lane Configurations – Existing Conditions (2025) ............... 14 Figure 5. Project Trip Distribution ..............................................................................................................................17 Figure 6. Peak Hour Traffic Volumes and Lane Configurations – Project-Generated Trips..................... 18 Figure 7. Peak Hour Traffic Volumes and Lane Configurations – Existing Plus Project Conditions (2025) ........................................................................................................................................................ 20 Figure 8. Peak Hour Traffic Volumes and Lane Configurations - Future Baseline Conditions (2027)......................................................................................................................................................... 22 Figure 9. Peak Hour Traffic Volumes and Lane Configurations – Future Plus Project Conditions (2027).........................................................................................................................................................24 Figure 10. Active Transportation Inventory............................................................................................................. 28 Figure 11. Holliston Avenue Sidewalk Along Project Frontage........................................................................... 29 Figure 12. Green Street Sidewalk Along Project Frontage ................................................................................. 29 Figure 13. Green Street/Holliston Avenue Intersection ....................................................................................... 30 List of Tables
Table 1. Existing Transit Service Stop Locations ......................................................................................................8 Table 2. Project Trip Generation Estimates ............................................................................................................ 10 Table 3. Intersection Level of Service Definitions - HCM Methodology...........................................................11 Table 4. Intersection Level of Service Significance Thresholds / Caps ...........................................................12 Table 5. Existing Conditions (2025) Intersection Peak Hour Level of Service..............................................16 Table 6. Existing Plus Project Conditions (2025) Intersection Peak Hour Level of Service ......................19 Table 7. Future Baseline Conditions (2027) Intersection Peak Hour Level of Service................................21 Table 8. Future Plus Project Conditions (2027) Intersection Peak Hour Level of Service....................... 23 Table 9. Off-Site Queuing Analysis Summary........................................................................................................ 26 Table 10. Active Transportation Impact Assessment.............................................................................................31 4 1. Introduction
This report summarizes the results of a transportation analysis for the proposed Research and Development building located at 1364 E. Green Street (Project) in the City of Pasadena and provides detailed information on the existing and future transportation conditions in the vicinity of the project site. Seven (7) existing intersections in the vicinity of the project site were analyzed. Additionally, an Active Transportation Review was prepared to identify potential effects of the proposed project on the bicycle, pedestrian, and transit network. This report has been prepared based on requirements within the City of Pasadena Transportation Impact Analysis Guidelines (April 2022).
1.1 Project Description
The Project site is located at 1364 E. Green Street and is currently improved with 115 stalls of existing surface parking spanning all 3 parcels. The proposed project will be a 4-story Research and Development building, with Lab/Office spaces on the ground level, a terrace on the top occupiable floor, along with 3 subterranean levels of parking. Vehicle access to the parking garage will be provided via an inbound driveway on Holliston Avenue, on the west side of the site, and an outbound driveway on Green Street, on the north side of the site. The main pedestrian access to the building will be located along Green Street. Figure 1 shows the project site plan.
Pedestrian
Vehicular | Tenant / Visitor
Vehicular | Service
Fire Access
Common Use
LEGEND
Project Site Plan
FIGURE 1
6 2. Existing Transportation Network
This section describes the roadway system and transit service in the vicinity of the Project. The existing configurations of the transportation network within the study area are described below.
2.1 Existing Street System
Colorado Boulevard, oriented in an east-west direction, is designated as a City Connector. The roadway consists of two lanes in each direction with a painted median within the study area. The roadway has a posted speed limit of 30 mph and on-street parking is provided.
Green Street, oriented in an east-west direction, is designated as a City Connector. The roadway is a one-way street in the eastbound direction that consists of three lanes. The roadway has a posted speed limit of 30 mph and on-street parking is provided.
Cordova Street, oriented in an east-west direction, is designated as a Neighborhood Connector. The roadway consists of one lane in each direction with a center two-way left-turn lane and a Class II bicycle lane. The roadway has a posted speed limit of 35 mph and on-street parking is provided.
Del Mar Boulevard, oriented in an east-west direction, is designated as a City Connector. The roadway consists of two lanes in each direction. The roadway has a posted speed limit of 35 mph and on-street parking is provided.
Wilson Avenue, oriented in a north-south direction, is designated as a Neighborhood Connector. The roadway consists of one lane in each direction, with a Class II bicycle lane. The roadway has a posted speed limit of 25 mph and on-street parking is provided.
Michigan Avenue, oriented in a north-south direction, is designated as an Access roadway. The roadway consists of one lane in each direction and has an offset configuration at Colorado Boulevard.
On-street parking is provided on the west side of the street north of Colorado Boulevard and both sides of the street south of Colorado Boulevard. The roadway has a posted speed limit of 25 mph.
Chester Avenue, oriented in a north-south direction, is designated as an Access roadway. The roadway consists of one lane in each direction and has an offset configuration at Colorado Boulevard.
The roadway has a posted speed limit of 25 mph and on-street parking is provided.
Holliston Avenue, oriented in a north-south direction, is designated as an Access roadway. The roadway consists of one lane in each direction. On-street parking is provided on the west side of the street except between Colorado Boulevard and Green Street where parking is on the east side of the street. The roadway has a posted speed limit of 25 mph.
Hill Avenue, oriented in a north-south direction, is designated as a City Connector within the study area. The roadway consists of two lanes in each direction in the study area. The roadway has a posted speed limit of 30 mph and on-street parking is generally provided on both sides of the street.
Figure 2 shows the existing street network and classifications in the study area.
Roadway Classifications
Project Site
Neighborhood
Connector-City
ConnectorAccess
Access-Alley
Roadway Classifications
E Colorado Boulevard
Cordova Street
S Wilson Avenue
Holliston Avenue
S Hill Avenue
E Del Mar Avenue
S Michigan Avenue
S Chester Avenue
FIGURE 2
E Green Street
8 2.2 Existing Transit Service
LA Metro, Pasadena Transit and Foothill Transit provide transit services in the study area. The bus stop locations, per line, are summarized in Table 1.
Table 1. Existing Transit Service Stop Locations
Location LA Metro Route Foothill Transit Pasadena Transit Colorado Blvd / Hill Ave
Northwest corner
180
187 None
267
Southeast corner
180
None None
267
Del Mar Blvd / Hill Ave
Northwest corner 267 None 10
Southwest corner 267 None 10
Source: Fehr & Peers.
9 3. Proposed Project Traffic
This section describes the methodology used to determine Project-related trip generation. The first step in analyzing traffic conditions with the Project is to estimate the number of new trips expected to be generated by the Project. The proposed Project consists of a 4-story Research and Development building, with laboratory and office space, and three (3) subterranean levels of parking.
Trip generation estimates for the Project were developed using rates contained in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition. The trip generation estimates are shown in Table 2. As shown in Table 2, the proposed Project is estimated to generate a total of 1,036 daily vehicle trips, with 96 vehicle trips in the AM peak hour (79 in, 17 out) and 92 vehicle trips in the PM peak hour (15 in, 77 out).
10 Table 2. Project Trip Generation Estimates
Land Use
ITE
Land
Use
Code
Size Daily
Rate
Trip Generation Rates [a]
Daily
Trips
Estimated Trip Generation
AM Peak Hour PM Peak Hour AM Peak Hour Trips PM Peak Hour Trips Rate In % Out
% Rate In% Out% In Out Total In Out Total
Research &
Development
Center
760 93.54
KSF 11.08 1.03 82% 18% 0.98 16% 84% 1,036 79 17 96 15 77 92 Total External Vehicle Trips 1,036 79 17 96 15 77 92
Net Incremental External Trips 1,036 79 17 96 15 77 92
[a] Source: Institute of Transportation Engineers (ITE), Trip Generation, 11th Edition, 2021. All rates are Peak Hour of Adjacent Street Traffic 11 4. Intersection Operational Analysis
This section summarizes the operational analysis of intersections in the study area. This section includes a discussion of the analysis methodologies and thresholds used in the transportation analysis and summarizes existing and future traffic operations with and without the proposed Project.
4.1 Analysis Methodology
The quality of traffic operations is characterized using the concept of Level of Service (LOS). LOS is defined by a range of grades from A (best) to F (worst). At intersections, LOS A represents relatively free flow operating conditions with little or no delay. LOS F is characterized by extremely unstable flow conditions, severe congestion, and delay, with traffic volumes at or near an intersection’s design capacity. This typically results in long vehicular queues extending from all approaches of an intersection.
Per the City’s guidelines, LOS analysis is performed using the Highway Capacity Manual (HCM) methodology, which uses vehicular delay criteria to determine LOS. Table 3 presents a brief description of each Level of Service letter grade (Source: Highway Capacity Manual, 7th Edition (2022)).
Table 3. Intersection Level of Service Definitions - HCM Methodology Level
of
Service
Description Delay in
Seconds
A
Progression is extremely favorable and most vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay.
≤10.0
B Progression is good, cycle lengths are short, or both. More vehicles stop than with LOS A, causing higher levels of average delay. >10.0 to 20.0 C
Higher congestion may result from fair progression, longer cycle lengths, or both. Individual cycle failures may begin to appear at this level, though many still pass through the intersection without stopping. >20.0 to 35.0
D
The influence of congestion becomes more noticeable. Longer delays may result from some combination of unfavorable progression, long cycle lengths, or high V/C ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable.
>35.0 to 55.0
E
This level is considered by many agencies to be the limit of acceptable delay. These high delay values generally indicate poor vehicle progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences.
>55.0 to 80.0
F
This level is considered oversaturation, which is when arrival flow rates exceed the capacity of the intersection. This level may also occur at high V/C ratios below 1.0 with many individual cycle failures. Poor progression and long cycle lengths may also be contributing factors to such delay levels.
>80.0
12 4.1.1 Intersection Thresholds of Significance / Caps The City of Pasadena has established the following thresholds/caps for intersection LOS, as shown in Table 4.
Table 4. Intersection Level of Service Significance Thresholds / Caps Study Intersections Existing Plus Project LOS Cap
Citywide D
Transit Oriented District (TOD) E
Note that the proposed Project is not located within a Transit Oriented District.
4.2 Study Area, Analysis Scenarios, and Existing
Volumes
The study area for analysis includes the following seven signalized (7) intersections in the vicinity of the Project site:
1. Wilson Avenue & Green Street
2. Holliston Avenue & Colorado Boulevard
3. Hill Avenue & Colorado Boulevard
4. Holliston Avenue & Green Street
5. Hill Avenue & Green Street / Pasadena City College Driveway
6. Hill Avenue & Cordova Street / Pasadena City College Driveway
7. Hill Avenue & Del Mar Boulevard
The Project location and study intersections are shown in Figure 3.
Traffic operations were evaluated for each of the following scenarios during the weekday morning (7:00 – 9:00AM) and evening (4:00 – 6:00PM) peak periods during typical weekday conditions while school was in session:
• Existing Conditions (2025)
• Existing Plus Project Conditions (2025)
• Future Baseline Conditions (2027)
• Future Plus Project Conditions (2027)
Additionally, an off-site queuing analysis was performed for the Future Baseline Conditions (2027) and Future Plus Project Conditions (2027) scenarios to assess queue formation in exclusive turn lanes at the study intersections.
4.2.1 Existing Traffic Volumes
Existing traffic counts at the study intersections were collected in May and June 2025. All counts were conducted during the morning peak period (7:00 – 9:00AM) and evening peak period (4:00 – 6:00PM).
The traffic operations analysis is based on the highest single hour of traffic during each time period at each location. Detailed vehicle turning movement data is included in Appendix A. Figure 4 shows the existing peak hour volumes and lane configurations at the study intersections. 1 2 3
4 5
6 7
Project Location & Study Intersections
E Colorado Boulevard
E Green Street
E Del Mar Boulevard
Cordova Street
S Wilson Avenue
S Holliston Avenue
S Hill Avenue
Project Site Study Intersections
Outbound Driveway
Loading Dock
Inbound Driveway
FIGURE 3
FIGURE 4
Peak Hour Traffic Volumes and Lane Configurations
Existing Conditions (2025)
186 (246)
48 (33)
19 (68)
200 (531)
48 (50)
243 (161)41 (30)
1. Wilson Ave/Green St
14 (27)
10 (27)
49 (84)
6 (17)
242 (565)
21 (32)
3 (9)10 (10)
4 (18)
2 (3)
605 (562)
69 (59)
2. Holliston Ave/Colorado Blvd
62 (59)
55 4 (644)
110 (27
8)
98 (149)
160 (456)
24 (64)
153 (118)641 (343)
144 (121)
159 (197)
522 (418)
140 (117)
3. Hill Ave/Colorado Blvd
53 (53)29 (28)
34 (58)
188 (519)
69 (39)
87 (64)13 (18)
4. Holliston Ave/Green St
580 (676)
42 (28)
123 (276)
16 (6)
61 (205)716 (531)
85 (18)
35 (54)
21 (65)
5. Hill Ave/Green St/
Pasadena City College
323 (113)
460 (420)
60 (14)
103 (108)
16 (8)
75 (167)
232 (15
8)
495 (580)73 (15)
13 (121)
10 (34)
12 (82)
6. Hill Ave/Cordova St/
Pasadena City College
115 (38)
4 4
8 (237)
30 (35)
108 (102)
427 (866)
24 (28)
189 (130)250 (337)
143 (411)
243 (196)
814 (493)
11 (43)
7. Hill Ave/Del Mar Blvd
Green St
Wilson Ave
Colorado Blvd
Hill Ave
Green St
Holliston Ave
Green St PCC Parking Lot
Hill Ave
Cordova St PCC Parking Lot
Hill Ave
Del Mar Blvd
Hill Ave
Colorado Blvd
Holliston Ave
B
CF CE
B
AC
D
E
D ACE
ACCF ACC
F
ECA ACC
F
B
E CE
B
A
D
CE
F
CCA
A
F
A
ACE CF
ECA
A
E
A
ACE CE
ECA ACC
F
1 2 3
4 5
6 7
E Colorado Boulevard
E Green Street
E Del Mar Boulevard
Cordova Street
S Wilson Avenue
S Holliston Avenue
S Hill Avenue
Project Site Study Intersections
Outbound Driveway
Loading Dock
Inbound Driveway AM (PM) Peak Hour Turning Movement Volumes 15 4.3 Intersection Level of Service Analysis
This section summarizes the results of the LOS analysis that was performed for the study intersections in existing and future year conditions. All LOS tables show delay in seconds.
4.3.1 Existing Conditions
Existing intersection operations were evaluated during the AM and PM peak hours at the study intersections using HCM 7th Edition methodology. Per City of Pasadena DOT guidelines, the following Synchro model inputs for saturation flow rates and peak hour factors were included in the analysis:
Saturation Flow Rates:
• 1,800 vehicles per hour per lane (vphpl) for exclusive through and right-turn lanes, and shared thru/right-turn or left-turn lanes
• 1,700 vphpl for exclusive left-turn lanes
• 1,600 for exclusive dual left-turn lanes
Peak Hour Factors:
• The Peak Hour Factor (PHF) was determined for each intersection as a whole based on traffic volumes collected in the field. The existing conditions PHF was applied to the analysis of future conditions with and without the proposed Project.
Table 5 summarizes the existing LOS and delay at the study intersections. All LOS calculation sheets are provided in Appendix B.
16 Table 5. Existing Conditions (2025) Intersection Peak Hour Level of Service INT
# Study Intersection Control
AM Peak Hour PM Peak Hour
Delay (s) LOS Delay (s) LOS
1 Wilson Avenue & Green
Street Signal 14.6 B 14.0 B
2 Holliston Avenue & Colorado
Boulevard Signal 27.5 C 24.4 C
3 Hill Avenue & Colorado
Boulevard Signal 33.4 C 28.3 C
4 Holliston Avenue & Green
Street Signal 16.2 B 9.4 A
5 Hill Avenue & Green Street /
Pasadena City College Dwy Signal 8.5 A 9.8 A
6 Hill Avenue & Cordova Street
/ Pasadena City College Dwy Signal 10.6 B 12.9 B
7 Hill Avenue & Del Mar
Boulevard Signal 26.1 C 35.8 D
As shown in Table 5 above, all of the study intersections are currently operating at LOS C or better during the AM peak hour. During the PM peak hour, six of the seven study intersections operate at LOS C or better. The Hill Avenue and Del Mar Boulevard intersection operates at LOS C during the AM peak hour and LOS D during the PM peak hour.
4.3.2 Existing Plus Project Conditions
This section presents the analysis of Existing Plus Project conditions. Existing Plus Project conditions were developed by adding the vehicle trips estimated to be generated by the proposed Project to the existing conditions traffic volumes.
As a first step, trip distribution assumptions were developed to determine the origin and destination of new vehicle trips associated with the proposed Project. The Project trip distribution is based on the land use, the circulation network in the vicinity of the Project, and project access locations, and was derived by utilizing the City of Pasadena Travel Demand Model (via a select zone model run).
As a second step, the new trips estimated to be generated by the Project, as shown in Table 2, were then assigned to the surrounding roadway system based on the distribution pattern to estimate the Project-related peak-hour traffic at both study intersections. Figure 5 illustrates the distribution of Project-generated trips on the surrounding roadway network, and Figure 6 shows the Projectgenerated traffic volumes at the study intersections. 1 2 3
4 5
6 7
Project Trip Di stribution
Project Site Study Intersections
E Colorado Boulevard
E Green Street
E Del Mar Boulevard
Cordova Street
S Wilson Avenue
S Holliston Avenue
S Hill Avenue
Outbound Driveway
Loading Dock
Inbound Driveway Inbound Trips
Outbound Trips
25%
15% 50%
13%
12%
5%
15%
12%
42% 35%
25%
10%
15%
5%
5%
8%
15%
23%
52%
50%
27%
27%
5%
5%
15%
10%
5%
8%
20%
5%
10%
48%
100%
10%
10%
FIGURE 5
FIGURE 6
Peak Hour Traffic Volumes and Lane Configurations
Project Generated Trips
0 (0)
4 (1)
0 (0)
12 (2)
0 (0)
0 (0)4 (1)
1. Wilson Ave/Green St
0 (0)0 (0)
0 (0)
0 (0)
0 (0)
6 (1)
0 (0)4 (1)0 (0)
1 (4)
1 (6)
8 (1)
2. Holliston Ave/Colorado Blvd
2 (10)
4 (19)
2 (9)
0 (0)
0 (0)
0 (0)
8 (1)
12 (2)
0 (0)
0 (0)
0 (0)
9 (1)
3. Hill Ave/Colorado Blvd
0 (0)
0 (0)
0 (0)
0 (0)
20 (4)
18 (3)
0 (0)
4. Holliston Ave/Green St
0 (0)
0 (0)
8 (38)
0 (0)
9 (39)21 (3)
0 (0)
0 (0)
0 (0)
5. Hill Ave/Green St/
Pasadena City College
12 (2)
0 (0)0 (0)
0 (0)
0 (0)
0 (0)
24 (15)
6 (27)
0 (0)
0 (0)
0 (0)
0 (0)
6. Hill Ave/Cordova St/
Pasadena City College
4 (1)
12 (2)
0 (0)
0 (0)
0 (0)
0 (0)
2 (8)
3 (15)
1 (4)
0 (0)
4 (1)
0 (0)
7. Hill Ave/Del Mar Blvd
Green St
Wilson Ave
Colorado Blvd
Hill Ave
Green St
Holliston Ave
Green St PCC Parking Lot Hill AveCordova St PCC Parking Lot Hill Ave Del Mar Blvd
Hill Ave
Colorado Blvd
Holliston Ave
BCE
CF
B
ACE
D
D
ACE
ACCF
ACCF
ACE
ACCF
BCE
E
B
ADF
CE
ACC
AF
ACF
ACE
ACE
AE
ACE
ACE
ACE
ACCF
1 2 3
4 5
6 7
E Colorado Boulevard
E Green Street
E Del Mar Boulevard
Cordova Street
S Wilson Avenue
S Holliston Avenue
S Hill Avenue
Project Site Study Intersections
Outbound Driveway
Loading Dock
Inbound Driveway AM (PM) Peak Hour Turning Movement Volumes 38 (7)
41 (8)
17 (77)
19 Existing Plus Project LOS and delay at the study intersections is summarized in Table 6. Existing Plus Project traffic volumes are shown in Figure
7. Table 6. Existing Plus Project Conditions (2025) Intersection Peak Hour Level of Service INT # Study Intersection
Existing Conditions Existing Plus Project Conditions
Exceeds
LOS Cap? AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 1 Wilson Ave & Green St 14.6 B 14.0 B 14.6 B 14.0 B No
2 Holliston Ave & Colorado Blvd 27.5 C 24.4 C 27.5 B 24.5 C No 3 Hill Ave & Colorado Blvd 33.4 C 28.3 C 33.9 C 28.5 C No 4 Holliston Av & Green St 16.2 B 9.4 A 16.5 B 9.5 A No
5 Hill Ave & Green St / Dwy 8.5 A 9.8 A 8.7 A 10.0 A No 6 Hill Ave & Cordova St / Dwy 10.6 B 12.9 B 11.0 B 13.0 B No 7 Hill Ave & Del Mar Blvd 26.1 C 35.8 D 26.3 C 36.2 D No As shown in Table 6, all of the study intersections are forecasted to operate at LOS C or better during the AM peak hour. During the PM peak hour, six of the seven study intersections are forecasted to operate at LOS C or better. The Hill Avenue and Del Mar Boulevard intersection is forecasted to operate at LOS C during the AM peak hour and LOS D during the PM peak hour. These results are consistent with existing conditions. None of the study intersections exceed the LOS cap with the proposed Project.
FIGURE 7
Peak Hour Traffic Volumes and Lane Configurations
Existing Plus Project Conditions (2025)
186 (246)
52 (34)
19 (68)
212 (533)
48 (50)
243 (161)45 (31)
1. Wilson Ave/Green St
14 (27)
10 (27)
49 (8
4)
6 (17)
242 (565)
27 (33)
3 (9)14 (11)4 (18)
3 (7)
606 (568)
77 (60)
2. Holliston Ave/Colorado Blvd
64 (69)
55 8 (663)
112 (287)
98 (149)
160 (456)
24 (64)
161 (119)
653 (345)
144 (121)
159 (197)
522 (418)
149 (118)
3. Hill Ave/Colorado Blvd
53 (53)29 (28)
34 (58)
188 (519)
89 (43)
105 (67)
13 (18)
4. Holliston Ave/Green St
580 (676)
42 (28)
131 (314)
16 (6)
70 (244)
737 (534)
85 (18)
35 (54)
21 (65)
5. Hill Ave/Green St/
Pasadena City College
335 (115)
460 (420)
60 (14)
103 (108)
16 (8)
75 (167)
256 (173)
501 (607)
73 (15)
13 (121)
10 (34)
12 (82)
6. Hill Ave/Cordova St/
Pasadena City College
119 (39)
460 (239)
30 (35)
108 (102)
427 (866)
24 (28)
191 (138)
253 (352)
144 (415)
243 (196)
818 (494)
11 (43)
7. Hill Ave/Del Mar Blvd
Green St
Wilson Ave
Colorado Blvd
Hill Ave
Green St
HollistonAve
Green St PCC Parking Lot
Hill Ave
Cordova St PCC Parking Lot
Hill Ave
Del Mar Blvd
Hill Ave
Colorado Blvd
Holliston Ave
B
CF
CE
B
ACE
D
D
ACE
ACCF
ACCF
ACE
ACCF
B
E
CE
B
ADF
CE
ACC
A
F
ACF
ACE
ACE
A
E
ACE
ACE
ACE
ACCF
1 2 3
4 5
6 7
E Colorado Boulevard
E Green Street
E Del Mar Boulevard
Cordova Street
S Wilson Avenue
S Holliston Avenue
S Hill Avenue
Project Site Study Intersections
Outbound Driveway
Loading Dock
Inbound Driveway AM (PM) Peak Hour Turning Movement Volumes 21 4.3.3 Future Baseline Conditions
This section presents the analysis of Future Baseline conditions (without the proposed Project) for the proposed Project’s opening year of 2027. Future Baseline conditions traffic volumes were developed by utilizing the City of Pasadena Travel Demand Model to evaluate projected citywide growth in traffic volumes between the model’s base year (2017) and future year (2035) scenarios.
Based on the projected citywide growth in traffic volumes, a growth rate of 1.4% (0.7% per year) was applied to the Existing Conditions traffic volumes to derive Future Baseline conditions (2027) traffic volumes at the study intersections. Table 7 summarizes the Future Baseline conditions LOS and delay at the study intersections. Future Baseline conditions traffic volumes are shown in Figure 8.
Table 7. Future Baseline Conditions (2027) Intersection Peak Hour Level of Service INT
# Study Intersection Control
AM Peak Hour PM Peak Hour
Delay (s) LOS Delay (s) LOS
1 Wilson Avenue & Green
Street Signal 14.6 B 14.0 B
2 Holliston Avenue & Colorado
Boulevard Signal 27.6 C 24.5 C
3 Hill Avenue & Colorado
Boulevard Signal 33.7 C 28.4 C
4 Holliston Avenue & Green
Street Signal 16.3 B 9.4 A
5 Hill Avenue & Green Street /
Pasadena City College Dwy Signal 8.5 A 9.9 A
6 Hill Avenue & Cordova Street
/ Pasadena City College Dwy Signal 10.9 B 13.1 B
7 Hill Avenue & Del Mar
Boulevard Signal 26.3 C 36.9 D
As shown in Table 7, all of the study intersections are forecasted to operate at LOS C or better during the AM peak hour. During the PM peak hour, six of the seven study intersections are forecasted to operate at LOS C or better. The Hill Avenue and Del Mar Boulevard intersection is forecasted to operate at LOS C during the AM peak hour and LOS D during the PM peak hour. No intersections are anticipated to exceed the LOS threshold in 2027 under Future Baseline conditions.
FIGURE 8
Peak Hour Traffic Volumes and Lane Configurations
Future Baseline Conditions (2027)
189 (249)
49 (33)
19 (69)
203 (538)
49 (51)
246 (163)42 (30)
1. Wilson Ave/Green St
14 (27)
10 (27)
50 (85)
6 (17)
245 (573)
21 (32)
3 (9)10 (10)4 (18)
2 (3)
613 (570)
70 (60)
2. Holliston Ave/Colorado Blvd
63 (60)
562 (653)
112 (282)
99 (151)
162 (462)
24 (65)
155 (120)
650 (34
8)
146 (123)
161 (200)
529 (424)
142 (119)
3. Hill Ave/Colorado Blvd
54 (54)
29 (28)
34 (59)
191 (526)
70 (40)88 (65)
13 (18)
4. Holliston Ave/Green St
588 (685)
43 (28)
125 (280)
16 (6)
62 (208)726 (53
8)
86 (18)
35 (55)
21 (66)
5. Hill Ave/Green St/
Pasadena City College
328 (115)
466 (426)
61 (14)
104 (110)
16 (8)
76 (169)
235 (160)
502 (588)
74 (15)
13 (123)
10 (34)
12 (83)
6. Hill Ave/Cordova St/
Pasadena City College
117 (39)
454 (240)
30 (35)
110 (103)
433 (878)
24 (28)
192 (132)
25 4 (342)
145 (417)
246 (199)
825 (500)
11 (44)
7. Hill Ave/Del Mar Blvd
Green St
Wilson Ave
Colorado Blvd
Hill Ave
Green St
HollistonAve
Green St PCC Parking Lot
Hill Ave
Cordova St PCC Parking Lot
Hill Ave
Del Mar Blvd
Hill Ave
Colorado Blvd
Holliston Ave
B
CF
CE
B
ACE
D
D
ACE
ACCF
ACCF
ACE
ACCF
B
E
CE
B
ADF
CE
ACC
A
F
ACF
ACE
ACE
A
E
ACE
ACE
ACE
ACCF
1 2 3
4 5
6 7
E Colorado Boulevard
E Green Street
E Del Mar Boulevard
Cordova Street
S Wilson Avenue
S Holliston Avenue
S Hill Avenue
Project Site Study Intersections
Outbound Driveway
Loading Dock
Inbound Driveway AM (PM) Peak Hour Turning Movement Volumes 23 4.3.4 Future with Project Conditions
This section presents the analysis of Future Plus Project conditions. Future Plus Project conditions traffic volumes were developed by adding the trips estimated to be generated by the proposed Project to the Future Baseline conditions traffic volumes. Table 8 summarizes the Future Plus Project LOS and delay at the study intersections. Future Plus Project conditions traffic volumes are shown in Figure 9.
Table 8. Future Plus Project Conditions (2027) Intersection Peak Hour Level of Service INT # Study Intersection
Future Baseline Conditions Future Plus Project Conditions Exceeds
LOS Cap? AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Delay (s) LOS Delay (s) LOS Delay (s) LOS Delay (s) LOS 1 Wilson Ave & Green St 14.6 B 14.0 B 14.6 B 14.0 B No
2 Holliston Ave & Colorado Blvd 27.6 C 24.5 C 27.6 C 24.6 C No 3 Hill Ave & Colorado Blvd 33.7 C 28.4 C 34.2 C 28.6 C No 4 Holliston Av & Green St 16.3 B 9.4 A 16.5 B 9.5 A No
5 Hill Ave & Green St / Dwy 8.5 A 9.9 A 8.7 A 10.0 B No 6 Hill Ave & Cordova St / Dwy 10.9 B 13.1 B 11.4 B 13.2 B No 7 Hill Ave & Del Mar Blvd 26.3 C 36.9 D 26.5 C 37.4 D No As shown in Table 8, all of the study intersections are forecasted to operate at LOS C or better during the AM peak hour. During the PM peak hour, six of the seven study intersections are forecasted to operate at LOS C or better. The Hill Avenue and Del Mar Boulevard intersection is forecasted to operate at LOS C during the AM peak hour and LOS D during the PM peak hour. No intersections are anticipated to exceed the LOS threshold in 2027 under Future Plus Project conditions.
FIGURE 9
Peak Hour Traffic Volumes and Lane Configurations
Future Plus Project Conditions (2027)
189 (249)
53 (34)
19 (69)
215 (540)
49 (51)
246 (163)46 (31)
1. Wilson Ave/Green St
14 (27)
10 (27)
50 (85)
6 (17)
245 (573)
27 (33)
3 (9)14 (11)4 (18)
3 (7)
614 (576)
78 (61)
2. Holliston Ave/Colorado Blvd
65 (70)
566 (672)
114 (291)
99 (151)
162 (462)
24 (65)
163 (121)
662 (350)
146 (123)
161 (200)
529 (424)
151 (120)
3. Hill Ave/Colorado Blvd
54 (54)
29 (28)
34 (59)
191 (526)
90 (44)
106 (68)
13 (18)
4. Holliston Ave/Green St
588 (685)
43 (28)
133 (318)
16 (6)
71 (247)
747 (541)
86 (18)
35 (55)
21 (66)
5. Hill Ave/Green St/
Pasadena City College
340 (117)
466 (426)
61 (14)
104 (110)
16 (8)
76 (169)
259 (175)
508 (615)
74 (15)
13 (123)
10 (34)
12 (83)
6. Hill Ave/Cordova St/
Pasadena City College
121 (40)
466 (242)
30 (35)
110 (103)
433 (878)
24 (28)
194 (140)
257 (357)
146 (421)
246 (199)
829 (501)
11 (44)
7. Hill Ave/Del Mar Blvd
Green St
Wilson Ave
Colorado Blvd
Hill Ave
Green St
HollistonAve
Green St PCC Parking Lot
Hill Ave
Cordova St PCC Parking Lot
Hill Ave
Del Mar Blvd
Hill Ave
Colorado Blvd
Holliston Ave
B
CF
CE
B
ACE
D
D
ACE
ACCF
ACCF
ACE
ACCF
B
E
CE
B
ADF
CE
ACC
A
F
ACF
ACE
ACE
A
E
ACE
ACE
ACE
ACCF
1 2 3
4 5
6 7
E Colorado Boulevard
E Green Street
E Del Mar Boulevard
Cordova Street
S Wilson Avenue
S Holliston Avenue
S Hill Avenue
Project Site Study Intersections
Outbound Driveway
Loading Dock
Inbound Driveway AM (PM) Peak Hour Turning Movement Volumes 25 4.4 Off-Site Queuing Analysis
The exclusive turn lane movements at the study intersections were evaluated to determine if adequate storage would be provided with the addition of Project-related trips. Table 9 summarizes the 95th percentile queue lengths for Future Baseline and Future Plus Project conditions. The calculated 95th percentile queue lengths are rounded up to the nearest ten feet. Queue lengths highlighted in green indicate turning movements that the Project would add vehicle trips to, and queue lengths shown in bold text indicate that queue length would exceed the available storage capacity. Queue output sheets are provided in Appendix C.
As shown in Table 9, 95th percentile queues are expected to exceed current exclusive turn lane pocket lengths in both Future Baseline and Future Plus Project conditions at the Hill Avenue & Cordova Street and Hill Avenue & Del Mar Boulevard intersections. At both intersections, the northbound left turn lane pocket length is expected to be exceeded only in the AM peak hour. At the intersection of Hill Avenue & Del Mar Boulevard, the southbound left turn lane pocket length is expected to be exceeded during the AM and PM peak hours. Traffic generated by the Project is not expected to cause exclusive turn lanes that are under capacity under Future Baseline conditions to exceed their capacities. 26 Table 9. Off-Site Queuing Analysis Summary
Int
# Intersection Movement
Storage
Length
(ft)
Future Baseline
Conditions
Future Plus Project
Conditions
AM Peak
Hour
PM Peak
Hour
AM Peak
Hour
PM Peak
Hour
1 Wilson Ave & Green St NBR 60 20 20 20 20
2 Holliston Ave &
Colorado Blvd
EBL 130 10 20 10 20
WBL 130 60 80 70 80
3 Hill Ave & Colorado
Blvd
NBL 140 50 40 50 50
NBR 120 40 110 40 120
SBL 120 90 80 90 80
EBL 160 80 110 80 110
EBR 60 0 10 0 10
WBL 140 100 90 110 90
WBR 120 90 100 90 100
5 Hill Ave & Green St
EBL 380 70 140 70 160
EBR 380 30 50 30 50
SBL 140 70 20 70 20
6 Hill Ave & Cordova St
NBL 50 230 50 300 50
SBL 110 70 20 70 20
EBL 180 100 110 100 110
EBR 120 30 50 30 50
7 Hill Ave & Del Mar Blvd
NBL 80 150 60 160 60
SBL 100 120 600 120 610
EBL 150 150 140 150 140
WBL 130 30 70 30 70
27 5. Active Transportation Assessment
This Active Transportation Assessment evaluates existing pedestrian, bicycle, and transit infrastructure in the vicinity of the project site. An Active Transportation Inventory Map identifies key facilities within a ¼-mile radius of the project site, including bicycle infrastructure (e.g., bike lanes, Class IV cycle tracks), nearby bus stops, and land uses that are likely to attract pedestrian or bicycle trips, such as schools and businesses. In addition, this assessment documents existing conditions along the project frontages, including the presence and condition of sidewalks, curb ramps, bus stops, and bike facilities.
Figure 10 below identifies the following local conditions within ¼-mile of the project site:
Bicycle facilities are located along Cordova Street. Buffered Class II bike lanes are present along a
1.5-mile segment from Hill Avenue to Arroyo Parkway. These facilities are part of a broader complete streets effort by the City of Pasadena that enhances conditions for all users through pedestrian ADA upgrades, curb extensions at eight intersections, and new and upgraded traffic signals.
Transit stops are served by LA Metro, Pasadena Transit, and Foothill Transit with multiple bus lines stopping at Colorado Boulevard and Del Mar Boulevard near Hill Avenue. Key stops include Metro Routes 180, 187, and 267, Pasadena Transit Route 10, and limited Foothill Transit service at Colorado/Hill.
Bicycle and pedestrian trip generating land uses within the project vicinity include:
• Pasadena City College
• St. Philip The Apostle Church
• Hill Avenue Branch Library
• Caltech Student Housing
• The Aqua Courtyard Hotel
Active Transportation Assessment
Project Site
Quarter-Mile
Radius
E Colorado Boulevard
E Green Street
Cordova Street
E Del Mar Boulevard
S Holliston Avenue
S Hill Avenue
S Michigan Avenue
S Chester Avenue
Bicycle & Pedestrian
Trip Generators
Bike Lane
Bus Stop
Food
Services
Elementary
School
Church/School
Church
Library
Hotel
Student
Housing
Church
Food
Services
Community
College
Book
Store
FIGURE 10
29 5.1 Existing Pedestrian Infrastructure
Holliston Avenue, classified as an Access roadway, and Green Street, classified as a City Connector roadway, provide satisfactory pedestrian facilities adjacent to the Project site. Along the project frontage, Green Street provides 6 feet of amenity / curb zone and 5 feet of walk zone. Holliston Avenue provides 12 feet of amenity / curb zone and 5 feet of walk zone. There are no deficiencies present along the Project frontage for pedestrian accommodations. Figure 11 and Figure 12 show the existing conditions along the Project frontage.
Figure 11. Holliston Avenue Sidewalk Along
Project Frontage
Figure 12. Green Street Sidewalk Along Project
Frontage
5.2 Existing Bicycle Facilities
No bicycle facilities currently exist along the Project frontages. The closest bicycle facilities to the Project exist along Cordova Street as shown in Figure 10. However, cyclists may still choose to use Green Street as an alternative parallel route to Colorado Boulevard, which has a much higher vehicle volume.
30 5.3 Existing Transit Amenities
No transit stops currently exist along the Project frontages. The closest transit stop to the Project is located at the intersection of Colorado Boulevard and Chester Avenue. This bus stop (Stop ID 1319) serves Metro lines 180 and 267 travelling eastbound along Colorado Boulevard.
Metro's North Hollywood to Pasadena Bus Rapid Transit project is expected to run buses along Green Street, with the route terminating at Hill Avenue. The project is still in the planning phase and construction is forecast to be completed in 2027.
5.4 Intersections
The signalized intersection of Green Street and Holliston Avenue is located adjacent to the Project site. This intersection is equipped with continental sidewalks, advanced stops, push buttons, an Accessible Pedestrian Signal (APS), a pedestrian countdown signal, and diagonal curb ramps with no obstructions present at any corner or leg of the intersection. Figure 13 below presents the view of the signalized intersection facing eastbound from the northwest corner of the intersection.
Figure 13. Green Street/Holliston Avenue Intersection
31 5.5 Assessment
Per the City’s guidelines, a development project would result in a negative effect on the active transportation network if it resulted in the removal or degradation of existing infrastructure which supports pedestrian, bicycle, and transit travel modes. In addition, a development project would also have a negative effect on the transportation network if it resulted in increased pedestrian or bicycle demand for facilities which are missing, damaged, or not designed to current standards. Given these criteria, the assessment of the project’s impacts is shown in Table 10.
Table 10. Active Transportation Impact Assessment
Criteria Yes/
No
Assessment 1: Removal or degradation of existing infrastructure Would the project remove transit stops, public benches/shelters, or other transit amenities? No
Would the project remove bicycle lanes or public bicycle parking? No Would the project remove or obstruct sidewalks, pedestrian paths, or crossings? No Would the project degrade street buffering elements such as street trees, parkway strips, and bicycle lane buffers? No
Would the project degrade visibility and lines of sight? No Would the project degrade appropriate-scale lighting? No Assessment 2: Increased demand on missing/damaged/sub-standard facilities Would the project increase pedestrian demand where there are missing curb ramps/crosswalks, narrow or broken sidewalks, or where a controlled crossing is not available without significant rerouting?
No
Would the project increase bicycle demand where there are no bicycle lanes, poor quality pavement, or lack of secure and well-lit parking? No
Would the project increase transit demand where there are missing crossings or where stops are located in isolated, unshaded, or unlit areas? No 32 6. Conclusions
Fehr & Peers prepared a Local Mobility Analysis for the proposed Research and Development building located at 1364 E. Green Street in the City of Pasadena. The following describes the results of the Local Mobility Analysis:
• The proposed Project is estimated to generate a total of 1,036 daily vehicle trips, with 96 vehicle trips in the AM peak hour (79 in, 17 out) and 92 vehicle trips in the PM peak hour (15 in, 77 out).
• None of the seven (7) study intersections are forecasted to operate at a Level of Service (LOS) that exceeds the City’s LOS cap/threshold.
• The 95th percentile queues are expected to exceed current exclusive turn lane pocket lengths under both Future Baseline and Future Plus Project conditions at the Hill Avenue & Cordova Street and Hill Avenue & Del Mar Boulevard intersections. However, traffic generated by the Project is not expected to cause exclusive turn lanes that are under capacity under Future Baseline conditions to exceed their capacities.
• The proposed Project is not anticipated to remove or degrade existing active transportation infrastructure, or increase pedestrian, bicycle, or transit demand on facilities that are damaged or sub-standard within a 0.25-mile radius of the Project site.
Appendix A.
Traffic Count
Data
Prepared by National Data & Surveying Services
ID: 25-020182-001 Day:
City: Pasadena Date:
AM 0 243 41 0 AM
NOON 0000 NOON
PM 0 161 29 1 PM
AM NOON PM PM NOON AM
0100 0 000
0 000
000 00 000
19 0 68 0 TEV 785 0 1119 0 000
200 0 531 3 PHF 0.95 0.90
48 0 50 0 0011
AM NOON PM PM NOON AM
PM 0 0 246 33 PM
NOON 0000 NOON
AM 0 0 186 48 AM
0 NONE
04:45 PM - 05:45 PM 315
S Wilson Ave & E Green St
Peak Hour Turning Movement Count
S Wilson Ave Tuesday
SOUTHBOUND 5/13/2025
PEAK HOURS
4:00 PM - 06:00 PM
08:00 AM - 09:00 AM 205 7:00 AM - 09:00 AM
COUNT PERIODS
NONE
593 0 289
Totals (AM) 211 Total Bikes (AM)
E Green St
EASTBOUND
WESTBOUND
E Green St
000
CONTROL
Siganlzed
Pedestrians (Crosswalks)
Totals (PM) Total Bikes (PM)
0 291
NORTHBOUND
S Wilson Ave
Totals (NOON) Total Bikes (NOON)
AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
PMNOONAMAMNOONPM
PMNOONAMAMNOONPM
14 0
20 16
0 4
100 2820
24 16
0 2
11 0
6 60 1250 9
0 1
0 0
2 2
020
060
0 0
0 0
0 0
000
000
0 0
1 0
1 0
190
000
0 0
50 0
531
68 016129
024633
0 0
0 0
0 0
000
000
0 0
48 0
200
19 024341
018648
DATE: LOCATION: PROJECT #: SC5439
Tue, Jun 3, 25 NORTH & SOUTH: LOCATION #: 1
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 2 0 1 2 0 0 0 0 0
7:00 AM 2 1 3 0 1 0 1 31 2 11 61 1 114 0 0 0 0 0
7:15 AM 3 2 4 2 1 1 0 38 2 15 65 0 133 0 0 0 0 0
7:30 AM 4 2 6 1 2 1 1 44 1 21 77 0 160 0 0 0 0 0
7:45 AM 3 3 8 0 1 2 1 41 3 44 141 2 249 0 0 0 0 0
8:00 AM 5 5 21 1 1 0 2 55 2 21 155 1 269 0 0 0 0 0
8:15 AM 4 2 9 2 2 1 1 58 5 15 151 0 250 0 0 0 0 0
8:30 AM 3 1 15 1 4 0 2 68 8 16 144 1 263 0 0 0 0 0
8:45 AM 2 2 4 0 3 2 1 61 6 17 155 0 253 0 0 0 0 0
VOLUMES 26 18 70 7 15 7 9 396 29 160 949 5 1,691 0 0 0 0 0 APPROACH % 23% 16% 61% 24% 52% 24% 2% 91% 7% 14% 85% 0% APP/DEPART 114 / 32 29 / 204 434 / 473 1,114 / 982 0
BEGIN PEAK HR
VOLUMES 14 10 49 4 10 3 6 242 21 69 605 2 1,035 0 0 0 0 APPROACH % 19% 14% 67% 24% 59% 18% 2% 90% 8% 10% 89% 0% PEAK HR FACTOR 0.589 0.850 0.862 0.955 0.962
APP/DEPART 73 / 18 17 / 100 269 / 295 676 / 622 0
4:00 PM 5 7 21 2 1 3 2 141 5 15 138 1 341 0 0 0 0 0
4:15 PM 6 5 22 3 2 2 4 145 6 11 144 2 352 0 0 0 0 0
4:30 PM 8 6 23 4 1 1 3 129 11 16 145 0 347 0 0 0 0 0
4:45 PM 7 11 21 5 3 4 5 135 8 14 135 1 349 0 0 0 0 0
5:00 PM 6 5 18 6 4 2 5 156 7 18 138 0 365 0 0 0 0 0
5:15 PM 4 4 15 4 5 2 4 148 9 15 121 3 334 0 0 0 0 0
5:30 PM 5 7 13 2 2 1 3 151 7 11 124 2 328 0 0 0 0 0
5:45 PM 8 2 11 2 1 0 2 158 6 10 121 0 321 0 0 0 0 0
VOLUMES 49 47 144 28 19 15 28 1,163 59 110 1,066 9 2,737 0 0 0 0 0 APPROACH % 20% 20% 60% 45% 31% 24% 2% 93% 5% 9% 90% 1%
APP/DEPART 240 / 84 62 / 188 1,250 / 1,335 1,185 / 1,130 0
BEGIN PEAK HR
VOLUMES 27 27 84 18 10 9 17 565 32 59 562 3 1,413 0 0 0 0 APPROACH % 20% 20% 61% 49% 27% 24% 3% 92% 5% 9% 90% 0%
PEAK HR FACTOR 0.885 0.771 0.914 0.969 0.968
APP/DEPART 138 / 47 37 / 101 614 / 667 624 / 598 0
N Holliston Ave
NORTH LEG
E Colorado Blvd WEST LEG EAST LEG E Colorado Blvd
SOUTH LEG
N Holliston Ave
N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 2 2 1 5 0 2 2 1 5 0 0 0 0 0
7:15 AM 2 3 1 0 6 1 3 0 0 4 1 0 1 0 2
7:30 AM 0 5 2 3 10 0 4 2 3 9 0 1 0 0 1
7:45 AM 4 3 1 2 10 1 3 1 2 7 3 0 0 0 3
8:00 AM 2 4 1 2 9 1 4 1 2 8 1 0 0 0 1
8:15 AM 3 7 1 3 14 3 6 1 3 13 0 1 0 0 1
8:30 AM 1 4 1 4 10 1 4 0 4 9 0 0 1 0 1
8:45 AM 1 5 2 3 11 1 5 2 3 11 0 0 0 0 0
TOTAL 13 33 11 18 75 8 31 9 18 66 5 2 2 0 9
BEGIN PEAK HR 6 19 4 12 41
4:00 PM 4 22 5 3 34 3 21 4 3 31 1 1 1 0 3
4:15 PM 7 17 4 4 32 5 15 4 4 28 2 2 0 0 4
4:30 PM 4 14 2 3 23 3 13 2 3 21 1 1 0 0 2
4:45 PM 4 14 1 5 24 4 14 1 5 24 0 0 0 0 0
5:00 PM 6 9 2 4 21 5 8 2 4 19 1 1 0 0 2
5:15 PM 4 9 1 3 17 3 9 1 3 16 1 0 0 0 1
5:30 PM 6 14 1 1 22 5 12 1 1 19 1 2 0 0 3
5:45 PM 7 25 0 1 33 7 25 0 1 33 0 0 0 0 0
TOTAL 42 124 16 24 206 35 117 15 24 191 7 7 1 0 15
17 50 9 16 92
AM PM AM
8:00 AM
PM
4:15 PM
ALL PED + BIKE & SCOOTER
8:00 AM
BEGIN PEAK HR 4:15 PM
PEDESTRIAN CROSSINGS BICYCLE & SCOOTER CROSSINGS
U-TURNS
N Holliston Ave N Holliston Ave E Colorado Blvd E Colorado Blvd
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Pasadena
N Holliston Ave
E Colorado Blvd
91 22 34 35 TOTAL 116
62 15 19 28 PM 84
297 157 AM 32
1,114 1,185 2,299
2,112 1,130
982
5 9
14 949
1,066 2,015
TOTAL
PM
AM
160 110 270
37 28
9 AM
PM
TOTAL
1,559 1,163
396
88 59 29
473
1,335 1,808
1,684 1,250
434
204 AM 26 18 70 114
188 PM 49 47 144 240
392 TOTAL 75 65 214 354
54 12 20 22 TOTAL 65
379 10 18 PM 47
173 104 AM 18
676 624
1,300
1,220
598 622
2 3 5
605 562
1,167
TOTAL
PM
AM
AM 8:00 AM
8:45 AM
69 59
128
23 17
6 #N/A
AM
PM
TOTAL
807 565 242
PM 4:15 PM
5:45 PM
53 32 21
295 667 962
883 614 269
100 AM 14 10 49 73
101 PM 27 27 84 138
201 Total 41 37 133 211
N Holliston Ave
N Holliston Ave
N Holliston Ave
E Colorado Blvd
E Colorado Blvd
PEAK HOUR
AimTD LLC
TURNING MOVEMENT COUNTS
N Holliston Ave
E Colorado Blvd
E Colorado Blvd
ALL HOURS
Pasadena
SC5439
Prepared by National Data & Surveying Services
ID: 25-020182-002 Day:
City: Pasadena Date:
AM 153 641 144 0 AM
NOON 0000 NOON
PM 118 343 121 0 PM
AM NOON PM PM NOON AM
0210 1 197 0 159
2 418 0 522
000 01 116 0 140
98 0 149 1 TEV 2767 0 2964 0 100
160 0 456 2 PHF 0.94 0.97
24 0 64 1 0121
AM NOON PM PM NOON AM
PM 0 59 644 278 PM
NOON 0000 NOON
AM 0 62 554 110 AM
0 NONE
04:15 PM - 05:15 PM 990
N/S Hill Ave & E Colorado Blvd
Peak Hour Turning Movement Count
N/S Hill Ave Tuesday
SOUTHBOUND 5/13/2025
PEAK HOURS
4:00 PM - 06:00 PM
07:45 AM - 08:45 AM 811 7:00 AM - 09:00 AM
COUNT PERIODS
NONE
856 0 414
Totals (AM) 523 Total Bikes (AM)
E Colorado Blvd
EASTBOUND
WESTBOUND
E Colorado Blvd
737 0 595
CONTROL
Siganlzed
Pedestrians (Crosswalks)
Totals (PM) Total Bikes (PM)
0 805
NORTHBOUND
N/S Hill Ave
Totals (NOON) Total Bikes (NOON)
AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
PMNOONAMAMNOONPM
PMNOONAMAMNOONPM
4 0
11 15
0 3
130 20120
23 20
0 6
6 0
12 110 5110 28
1 9
0 0
4 0
030
022
0 0
0 0
0 0
000
000
0 2
0 1
2 0
010
000
197
418
64 116
456
149
118343121
59644278
0 0
0 0
0 0
000
000
159
522
24 140
160
98 153641144
62554110
DATE: LOCATION: PROJECT #: SC5439
Tue, Jun 3, 25 NORTH & SOUTH: LOCATION #: 2
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X 1 0 0 1 X 0 3 0 X X X 0 0 0 0
7:00 AM 0 9 1 1 8 0 3 12 4 0 0 0 38 0 0 0 0 0
7:15 AM 0 10 4 2 11 0 1 11 6 0 0 0 45 0 0 0 0 0
7:30 AM 0 8 5 1 25 0 2 22 11 0 0 0 74 0 0 0 0 0
7:45 AM 0 11 8 3 38 0 5 38 35 0 0 0 138 0 0 0 0 0
8:00 AM 0 22 12 5 21 0 8 37 15 0 0 0 120 0 0 0 0 0
8:15 AM 0 9 5 3 13 0 11 41 11 0 0 0 93 0 0 0 0 0
8:30 AM 0 11 4 2 15 0 10 72 8 0 0 0 122 0 0 0 0 0
8:45 AM 0 10 3 3 13 0 6 62 9 0 0 0 106 0 0 0 0 0
VOLUMES 0 90 42 20 144 0 46 295 99 0 0 0 736 0 0 0 0 0
APPROACH % 0% 68% 32% 12% 88% 0% 10% 67% 23% 0% 0% 0%
APP/DEPART 132 / 136 164 / 243 440 / 357 0 / 0 0
BEGIN PEAK HR
VOLUMES 0 53 29 13 87 0 34 188 69 0 0 0 473 0 0 0 0
APPROACH % 0% 65% 35% 13% 87% 0% 12% 65% 24% 0% 0% 0%
PEAK HR FACTOR 0.603 0.610 0.808 0.000 0.857
APP/DEPART 82 / 87 100 / 156 291 / 230 0 / 0 0
4:00 PM 0 15 15 3 11 0 18 125 9 0 0 0 196 0 0 0 0 0
4:15 PM 0 14 11 4 12 0 15 124 10 0 0 0 190 0 0 0 0 0
4:30 PM 0 16 9 6 14 0 13 125 11 0 0 0 194 0 0 0 0 0
4:45 PM 0 14 6 4 15 0 15 121 9 0 0 0 184 0 0 0 0 0
5:00 PM 0 11 8 5 14 0 14 138 10 0 0 0 200 0 0 0 0 0
5:15 PM 0 12 5 3 21 0 16 135 9 0 0 0 201 0 0 0 0 0
5:30 PM 0 14 4 2 15 0 10 132 8 0 0 0 185 0 0 0 0 0
5:45 PM 0 10 2 2 14 0 5 111 0 0 0 0 144 0 0 0 0 0
VOLUMES 0 106 60 29 116 0 106 1,011 66 0 0 0 1,494 0 0 0 0 0 APPROACH % 0% 64% 36% 20% 80% 0% 9% 85% 6% 0% 0% 0%
APP/DEPART 166 / 212 145 / 182 1,183 / 1,100 0 / 0 0
BEGIN PEAK HR
VOLUMES 0 53 28 18 64 0 58 519 39 0 0 0 779 0 0 0 0
APPROACH % 0% 65% 35% 22% 78% 0% 9% 84% 6% 0% 0% 0%
PEAK HR FACTOR 0.810 0.854 0.951 0.000 0.969
APP/DEPART 81 / 111 82 / 103 616 / 565 0 / 0 0
S Holliston Ave
NORTH LEG
E Green St WEST LEG EAST LEG E Green St
SOUTH LEG
S Holliston Ave
N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 1 3 2 0 6 1 3 2 0 6 0 0 0 0 0
7:15 AM 2 2 1 0 5 2 2 1 0 5 0 0 0 0 0
7:30 AM 1 1 0 2 4 1 1 0 2 4 0 0 0 0 0
7:45 AM 2 3 0 1 6 2 2 0 1 5 0 1 0 0 1
8:00 AM 1 4 0 0 5 1 4 0 0 5 0 0 0 0 0
8:15 AM 1 3 0 0 4 1 3 0 0 4 0 0 0 0 0
8:30 AM 0 5 1 3 9 0 5 1 3 9 0 0 0 0 0
8:45 AM 0 8 0 1 9 0 8 0 1 9 0 0 0 0 0
TOTAL 8 29 4 7 48 8 28 4 7 47 0 1 0 0 1
BEGIN PEAK HR 4 14 1 4 23
4:00 PM 2 11 1 3 17 2 11 1 2 16 0 0 0 1 1
4:15 PM 1 8 2 2 13 1 8 2 2 13 0 0 0 0 0
4:30 PM 0 5 1 4 10 0 5 1 4 10 0 0 0 0 0
4:45 PM 0 3 1 3 7 0 3 1 3 7 0 0 0 0 0
5:00 PM 1 4 0 4 9 1 4 0 4 9 0 0 0 0 0
5:15 PM 0 5 1 3 9 0 5 1 3 9 0 0 0 0 0
5:30 PM 2 3 0 3 8 2 3 0 3 8 0 0 0 0 0
5:45 PM 2 2 1 1 6 2 2 1 1 6 0 0 0 0 0
TOTAL 8 41 7 23 79 8 41 7 22 78 0 0 0 1 1
1 17 3 14 35
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Pasadena
S Holliston Ave
E Green St
BEGIN PEAK HR 4:30 PM
PEDESTRIAN CROSSINGS BICYCLE & SCOOTER CROSSINGS
U-TURNS
S Holliston Ave S Holliston Ave E Green St E Green St
AM PM AM
7:45 AM
PM
4:30 PM
ALL PED + BIKE & SCOOTER
7:45 AM
309 0 260 49 TOTAL 348
145 0 116 29 PM 212
164 0 144 20 AM 136
0 0 0
0 0 0
0 0 0
0 0 0
TOTAL
PM
AM
0 0 0
152 106
46 AM
PM
TOTAL
1,306 1,011
295
165
66 99
357
1,100 1,457
1,623 1,183
440
243 AM 0 90 42 132
182 PM 0 106 60 166
425 TOTAL 0 196 102 298
182 0 151 31 TOTAL 198
82 0 64 18 PM 111
100 0 87 13 AM 87
0 0 0
0 0 0
0 0 0
0 0 0
TOTAL
PM
AM
AM 7:45 AM
8:45 AM
0 0 0
92 58 34
#N/A
AM
PM
TOTAL
707 519 188
PM 4:30 PM
5:45 PM
108
39 69
230 565 795
907 616 291
156 AM 0 53 29 82
103 PM 0 53 28 81
259 Total 0 106 57 163
AimTD LLC
TURNING MOVEMENT COUNTS
S Holliston Ave
E Green St
E Green St
ALL HOURS
Pasadena
SC5439
S Holliston Ave
S Holliston Ave
S Holliston Ave
E Green St
E Green St
PEAK HOUR
Prepared by National Data & Surveying Services
ID: 25-020182-003 Day:
City: Pasadena Date:
AM 0 716 85 0 AM
NOON 0000 NOON
PM 0 531 17 1 PM
AM NOON PM PM NOON AM
0210 1 54 0 35
0 000
000 01 65 0 21
123 0 276 1.3 TEV 1679 0 1859 0 000
16 0 6 0.3 PHF 0.95 0.92
61 0 205 1.3 0020
AM NOON PM PM NOON AM
PM 0 0 676 28 PM
NOON 0000 NOON
AM 0 0 580 42 AM
Pedestrians (Crosswalks)
Totals (PM) Total Bikes (PM)
0 798
NORTHBOUND
S Hill Ave
Totals (NOON) Total Bikes (NOON)
NONE
51 0 143
Totals (AM) 801 Total Bikes (AM)
E Green St/Pasadena City College - Lot 1 East Dwy
EASTBOUND
WESTBOUND
E Green St/Pasadena City College - Lot 1 East Dwy
000
CONTROL
Siganlzed
0 NONE
04:00 PM - 05:00 PM 1007
S Hill Ave & E Green St/Pasadena City College - Lot 1 East Dwy Peak Hour Turning Movement Count
S Hill Ave Tuesday
SOUTHBOUND 5/13/2025
PEAK HOURS
4:00 PM - 06:00 PM
07:45 AM - 08:45 AM 738 7:00 AM - 09:00 AM
COUNT PERIODS
AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
PMNOONAMAMNOONPM
PMNOONAMAMNOONPM
3 0
6 8
0 4
90 1440
21 4
0 1
4 0
5 00 000 0
0 0
0 1
0 2
040
070
0 0
0 0
0 0
000
000
0 0
0 1
0 0
030
000
54 0
205 65
6 276
053117
067628
0 0
0 0
0 0
000
000
35 0
61 21
16 123
071685
058042
Prepared by National Data & Surveying Services
ID: 25-020182-004 Day:
City: Pasadena Date:
AM 232 495 73 0 AM
NOON 0000 NOON
PM 158 580 15 0 PM
AM NOON PM PM NOON AM
0210 0.5 121 0 13
0.5 34 0 10
000 01 82 0 12
103 0 108 1 TEV 1872 0 1820 0 000
16 0 8 1 PHF 0.89 0.93
75 0 167 1 0120
AM NOON PM PM NOON AM
PM 0 113 420 14 PM
NOON 0000 NOON
AM 0 323 460 60 AM
Pedestrians (Crosswalks)
Totals (PM) Total Bikes (PM)
0 582
NORTHBOUND
S Hill Ave
Totals (NOON) Total Bikes (NOON)
NONE
37 0 149
Totals (AM) 829 Total Bikes (AM)
Cordova St/Pasadena parking lot Dwy
EASTBOUND
WESTBOUND
Cordova St/Pasadena parking lot Dwy
565 0 305
CONTROL
Siganlzed
0 NONE
04:00 PM - 05:00 PM 649
S Hill Ave & Cordova St/Pasadena parking lot Dwy
Peak Hour Turning Movement Count
S Hill Ave Tuesday
SOUTHBOUND 5/13/2025
PEAK HOURS
4:00 PM - 06:00 PM
07:45 AM - 08:45 AM 576 7:00 AM - 09:00 AM
COUNT PERIODS
AM NOON PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
PMNOONAMAMNOONPM
PMNOONAMAMNOONPM
4 0
4 7
0 4
30 310
2 5
0 4
3 0
2 50 140 6
2 2
0 0
0 2
230
020
0 0
0 0
0 0
000
000
0 1
0 0
0 0
110
000
121
34 167 82
8 108
15858015
11342014
0 0
0 0
0 0
000
000
13 10
75 12
16 103
23249573
32346060
DATE: LOCATION: PROJECT #: SC5439
Tue, Jun 3, 25 NORTH & SOUTH: LOCATION #: 3
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 2 0 1 2 0 1 2 0 1 2 1 0 0 0 0
7:00 AM 7 26 5 14 23 25 8 46 5 1 115 36 311 0 0 0 0 0
7:15 AM 12 48 3 19 34 21 10 51 4 2 159 51 414 0 0 0 0 0 7:30 AM 20 74 1 23 53 37 11 66 2 3 197 83 570 0 0 0 0 0 7:45 AM 41 114 5 34 67 48 23 102 8 3 217 57 719 0 0 0 0 0 8:00 AM 22 98 7 36 83 57 28 108 6 2 197 54 698 0 0 0 0 0 8:15 AM 28 114 4 32 40 44 25 112 4 3 194 68 668 0 0 0 0 0 8:30 AM 24 122 14 41 60 40 32 105 6 3 206 64 717 0 0 0 0 0 8:45 AM 28 134 11 41 43 38 21 92 5 4 178 80 675 0 0 0 0 0 VOLUMES 182 730 50 240 403 310 158 682 40 21 1,463 493 4,772 0 0 0 0 0 APPROACH % 19% 76% 5% 25% 42% 33% 18% 78% 5% 1% 74% 25% APP/DEPART 962 / 1,381 953 / 464 880 / 972 1,977 / 1,955 0
BEGIN PEAK HR
VOLUMES 115 448 30 143 250 189 108 427 24 11 814 243 2,802 0 0 0 0 APPROACH % 19% 76% 5% 25% 43% 32% 19% 76% 4% 1% 76% 23% PEAK HR FACTOR 0.927 0.827 0.977 0.964 0.974
APP/DEPART 593 / 799 582 / 285 559 / 600 1,068 / 1,118 0 4:00 PM 12 70 10 102 107 38 23 206 7 13 136 67 791 0 0 0 0 0 4:15 PM 10 65 9 104 95 33 16 211 7 15 127 45 737 0 0 0 0 0 4:30 PM 7 48 8 117 69 34 32 221 4 8 110 41 699 0 0 0 0 0 4:45 PM 9 54 8 88 66 25 31 228 10 7 120 43 689 0 0 0 0 0 5:00 PM 13 71 7 106 86 33 29 205 14 4 120 42 730 0 0 0 0 0 5:15 PM 16 53 12 106 95 27 23 230 14 4 129 39 748 0 0 0 0 0 5:30 PM 6 54 9 106 70 32 23 222 9 10 101 30 672 0 0 0 0 0 5:45 PM 9 62 5 94 58 33 22 202 10 10 106 41 652 0 0 0 0 0 VOLUMES 82 477 68 823 646 255 199 1,725 75 71 949 348 5,718 0 0 0 0 0 APPROACH % 13% 76% 11% 48% 37% 15% 10% 86% 4% 5% 69% 25% APP/DEPART 627 / 1,024 1,724 / 792 1,999 / 2,616 1,368 / 1,286 0
BEGIN PEAK HR
VOLUMES 38 237 35 411 337 130 102 866 28 43 493 196 2,916 0 0 0 0 APPROACH % 12% 76% 11% 47% 38% 15% 10% 87% 3% 6% 67% 27% PEAK HR FACTOR 0.842 0.889 0.926 0.847 0.922
APP/DEPART 310 / 535 878 / 408 996 / 1,312 732 / 661 0
S Hill Ave
NORTH LEG
E Del Mar Blvd WEST LEG EAST LEG E Del Mar Blvd
SOUTH LEG
S Hill Ave
N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 2 1 3 0 6 2 1 3 0 6 0 0 0 0 0
7:15 AM 3 1 3 0 7 3 1 3 0 7 0 0 0 0 0
7:30 AM 1 1 2 6 10 1 0 1 4 6 0 1 1 2 4
7:45 AM 0 3 1 4 8 0 2 1 4 7 0 1 0 0 1
8:00 AM 2 6 2 4 14 1 4 2 3 10 1 2 0 1 4
8:15 AM 6 3 4 4 17 6 3 4 3 16 0 0 0 1 1
8:30 AM 2 2 2 3 9 2 2 2 3 9 0 0 0 0 0
8:45 AM 7 2 5 8 22 7 2 5 7 21 0 0 0 1 1
TOTAL 23 19 22 29 93 22 15 21 24 82 1 4 1 5 11
BEGIN PEAK HR 9 11 9 13 42
4:00 PM 5 12 11 9 37 5 11 11 8 35 0 1 0 1 2
4:15 PM 2 6 6 4 18 1 6 5 4 16 1 0 1 0 2
4:30 PM 2 7 9 2 20 2 7 9 2 20 0 0 0 0 0
4:45 PM 2 1 1 6 10 2 1 1 6 10 0 0 0 0 0
5:00 PM 2 1 1 2 6 2 0 1 2 5 0 1 0 0 1
5:15 PM 1 5 5 3 14 1 5 2 3 11 0 0 3 0 3
5:30 PM 4 3 2 4 13 4 3 2 4 13 0 0 0 0 0
5:45 PM 4 4 0 3 11 4 4 0 3 11 0 0 0 0 0
TOTAL 22 39 35 33 129 21 37 31 32 121 1 2 4 1 8
10 25 26 20 81
AM PM AM
7:45 AM
PM
4:00 PM
ALL PED + BIKE & SCOOTER
7:45 AM
BEGIN PEAK HR 4:00 PM
PEDESTRIAN CROSSINGS BICYCLE & SCOOTER CROSSINGS
U-TURNS
S Hill Ave S Hill Ave E Del Mar Blvd E Del Mar Blvd
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Pasadena
S Hill Ave
E Del Mar Blvd
2,677 565 1,049 1,063 TOTAL 2,405
1,724 255 646 823 PM 1,024
953 310 403 240 AM 1,381
1,977 1,368 3,345
3,241 1,286 1,955
493 348 841
1,463
949
2,412
TOTAL
PM
AM
21 71 92
357 199 158
AM
PM
TOTAL
2,407 1,725
682
115
75 40
972
2,616 3,588
2,879 1,999
880
464 AM 182 730 50 962
792 PM 82 477 68 627
1,256 TOTAL 264 1,207 118 1,589
1,460 319 587 554 TOTAL 1,334
878 130 337 411 PM 535
582 189 250 143 AM 799
1,068
732
1,800
1,779
661
1,118
243 196 439
814 493
1,307
TOTAL
PM
AM
AM 7:45 AM
8:45 AM
11 43 54
210 102 108
#N/A
AM
PM
TOTAL
1,293
866 427
PM 4:00 PM
5:45 PM
52 28 24
600
1,312 1,912
1,555
996 559
285 AM 115 448 30 593
408 PM 38 237 35 310
693 Total 153 685 65 903
S Hill Ave
S Hill Ave
S Hill Ave
E Del Mar Blvd
E Del Mar Blvd
PEAK HOUR
AimTD LLC
TURNING MOVEMENT COUNTS
S Hill Ave
E Del Mar Blvd
E Del Mar Blvd
ALL HOURS
Pasadena
SC5439
Appendix B.
LOS Calculation
Sheets
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 1: Wilson Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 200 48 0 0 0 0 186 48 41 243 0 Future Volume (veh/h) 19 200 48 0 0 0 0 186 48 41 243 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.95 1.00 0.99 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 20 211 51 0 196 51 43 256 0
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 169 1764 401 0 681 573 114 590 0
Arrive On Green 0.48 0.48 0.48 0.00 0.39 0.39 0.39 0.39 0.00 Sat Flow, veh/h 355 3697 841 0 1758 1480 142 1523 0
Grp Volume(v), veh/h 98 90 94 0 196 51 299 0 0
Grp Sat Flow(s),veh/h/ln 1740 1600 1553 0 1758 1480 1665 0 0 Q Serve(g_s), s 2.2 2.2 2.4 0.0 5.4 1.5 0.0 0.0 0.0
Cycle Q Clear(g_c), s 2.2 2.2 2.4 0.0 5.4 1.5 8.8 0.0 0.0 Prop In Lane 0.20 0.54 0.00 1.00 0.14 0.00
Lane Grp Cap(c), veh/h 830 763 741 0 681 573 703 0 0
V/C Ratio(X) 0.12 0.12 0.13 0.00 0.29 0.09 0.43 0.00 0.00 Avail Cap(c_a), veh/h 830 763 741 0 681 573 703 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.1 10.1 10.2 0.0 14.8 13.6 15.8 0.0 0.0 Incr Delay (d2), s/veh 0.3 0.3 0.4 0.0 1.1 0.3 1.9 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.8 0.8 0.0 2.2 0.5 3.7 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 10.4 10.5 10.5 0.0 15.9 13.9 17.7 0.0 0.0 LnGrp LOS B B B B B B
Approach Vol, veh/h 282 247 299
Approach Delay, s/veh 10.5 15.5 17.7
Approach LOS B B B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 38.3 31.7 31.7
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 33.4 27.1 27.1
Max Q Clear Time (g_c+I1), s 4.4 10.8 7.4
Green Ext Time (p_c), s 0.3 0.4 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 14.6
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 2: Holliston Ave & Colorado Blvd Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 242 21 69 605 2 14 10 49 4 10 3 Future Volume (veh/h) 6 242 21 69 605 2 14 10 49 4 10 3 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.94 0.98 0.96 0.99 0.98 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 0.90 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1758 1758 1758 1758 1758 1758 Adj Flow Rate, veh/h 6 252 11 72 630 1 15 10 30 4 10 2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 149 823 36 274 867 1 257 176 451 250 587 112 Arrive On Green 0.25 0.25 0.25 0.25 0.25 0.25 0.62 0.62 0.62 0.62 0.62 0.62 Sat Flow, veh/h 699 3251 141 968 3421 5 320 283 723 311 940 179 Grp Volume(v), veh/h 6 129 134 72 308 323 55 0 0 16 0 0 Grp Sat Flow(s),veh/h/ln 699 1670 1722 968 1670 1757 1326 0 0 1429 0 0 Q Serve(g_s), s 0.6 5.0 5.1 5.2 13.5 13.5 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 14.1 5.0 5.1 10.3 13.5 13.5 1.2 0.0 0.0 0.3 0.0 0.0 Prop In Lane 1.00 0.08 1.00 0.00 0.27 0.55 0.25 0.12
Lane Grp Cap(c), veh/h 149 423 436 274 423 445 885 0 0 948 0 0 V/C Ratio(X) 0.04 0.30 0.31 0.26 0.73 0.73 0.06 0.00 0.00 0.02 0.00 0.00 Avail Cap(c_a), veh/h 183 503 519 321 503 529 885 0 0 948 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.87 0.87 0.87 0.91 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 33.8 24.2 24.2 28.3 27.3 27.3 5.9 0.0 0.0 5.7 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.4 0.4 0.4 3.7 3.6 0.1 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 2.0 2.0 1.2 5.6 5.9 0.4 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 33.9 24.6 24.6 28.8 31.1 30.9 6.0 0.0 0.0 5.7 0.0 0.0 LnGrp LOS C C C C C C A A
Approach Vol, veh/h 269 703 55 16
Approach Delay, s/veh 24.8 30.8 6.0 5.7
Approach LOS C C A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 54.8 25.2 54.8 25.2
Change Period (Y+Rc), s 4.9 4.9 4.9 4.9
Max Green Setting (Gmax), s 46.1 24.1 46.1 24.1
Max Q Clear Time (g_c+I1), s 3.2 16.1 2.3 15.5
Green Ext Time (p_c), s 0.3 0.9 0.1 2.8
Intersection Summary
HCM 7th Control Delay, s/veh 27.5
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 3: Hill Ave & Colorado Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 98 160 24 140 522 159 62 554 110 144 641 153 Future Volume (veh/h) 98 160 24 140 522 159 62 554 110 144 641 153 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.96 0.98 0.96 1.00 0.98 0.99 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 104 170 7 149 555 87 66 589 34 153 682 143 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 380 1150 492 552 1132 484 237 924 404 314 795 167 Arrive On Green 0.10 0.34 0.34 0.10 0.34 0.34 0.08 0.28 0.28 0.10 0.29 0.29 Sat Flow, veh/h 1581 3340 1429 1581 3340 1429 1581 3340 1461 1581 2731 572 Grp Volume(v), veh/h 104 170 7 149 555 87 66 589 34 153 417 408 Grp Sat Flow(s),veh/h/ln 1581 1670 1429 1581 1670 1429 1581 1670 1461 1581 1670 1633 Q Serve(g_s), s 3.9 3.5 0.3 5.9 13.2 4.3 2.8 15.5 1.7 6.7 23.6 23.6 Cycle Q Clear(g_c), s 3.9 3.5 0.3 5.9 13.2 4.3 2.8 15.5 1.7 6.7 23.6 23.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.35
Lane Grp Cap(c), veh/h 380 1150 492 552 1132 484 237 924 404 314 486 476 V/C Ratio(X) 0.27 0.15 0.01 0.27 0.49 0.18 0.28 0.64 0.08 0.49 0.86 0.86 Avail Cap(c_a), veh/h 403 1150 492 583 1132 484 307 1039 454 361 519 508 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.96 0.96 0.96 1.00 1.00 1.00 0.94 0.94 0.94 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.6 22.6 21.6 17.5 26.2 23.3 24.1 31.8 26.8 23.1 33.5 33.5 Incr Delay (d2), s/veh 0.4 0.3 0.1 0.3 1.5 0.8 0.6 1.7 0.2 1.2 14.3 14.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 1.4 0.1 2.1 5.4 1.5 1.1 6.4 0.6 2.5 11.3 11.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 18.0 22.9 21.6 17.8 27.7 24.1 24.7 33.5 27.0 24.3 47.8 48.2 LnGrp LOS B C C B C C C C C C D D
Approach Vol, veh/h 281 791 689 978
Approach Delay, s/veh 21.1 25.5 32.3 44.3
Approach LOS C C C D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 14.0 39.3 14.1 32.6 14.6 38.8 12.6 34.0 Change Period (Y+Rc), s 4.2 4.9 4.2 4.9 4.2 4.9 4.2 4.9 Max Green Setting (Gmax), s 11.8 26.1 12.8 31.1 11.8 26.1 12.8 31.1 Max Q Clear Time (g_c+I1), s 7.9 5.5 8.7 17.5 5.9 15.2 4.8 25.6 Green Ext Time (p_c), s 0.1 1.7 0.1 5.6 0.1 4.8 0.1 3.5 Intersection Summary
HCM 7th Control Delay, s/veh 33.4
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 4: Holliston Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 34 188 69 0 0 0 0 53 29 13 87 0
Future Volume (veh/h) 34 188 69 0 0 0 0 53 29 13 87 0
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 40 219 59 0 62 1 15 101 0
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 500 2725 703 0 148 2 58 150 0
Arrive On Green 0.80 0.80 0.80 0.00 0.10 0.10 0.10 0.10 0.00 Sat Flow, veh/h 626 3411 880 0 1552 25 131 1575 0
Grp Volume(v), veh/h 110 101 107 0 0 63 116 0 0
Grp Sat Flow(s),veh/h/ln 1727 1600 1590 0 0 1577 1705 0 0 Q Serve(g_s), s 1.2 1.2 1.3 0.0 0.0 3.4 2.5 0.0 0.0
Cycle Q Clear(g_c), s 1.2 1.2 1.3 0.0 0.0 3.4 5.9 0.0 0.0 Prop In Lane 0.36 0.55 0.00 0.02 0.13 0.00
Lane Grp Cap(c), veh/h 1380 1278 1271 0 0 150 208 0 0
V/C Ratio(X) 0.08 0.08 0.08 0.00 0.00 0.42 0.56 0.00 0.00 Avail Cap(c_a), veh/h 1380 1278 1271 0 0 493 570 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 0.00 1.00 0.98 0.00 0.00 Uniform Delay (d), s/veh 1.9 1.9 1.9 0.0 0.0 38.4 39.5 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.1 0.1 0.0 0.0 1.9 2.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.3 0.3 0.0 0.0 1.4 2.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 2.1 2.1 2.1 0.0 0.0 40.2 41.7 0.0 0.0 LnGrp LOS A A A D D
Approach Vol, veh/h 318 63 116
Approach Delay, s/veh 2.1 40.2 41.7
Approach LOS A D D
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 76.8 13.2 13.2
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 52.4 28.1 28.1
Max Q Clear Time (g_c+I1), s 3.3 5.4 7.9
Green Ext Time (p_c), s 2.2 0.3 0.6
Intersection Summary
HCM 7th Control Delay, s/veh 16.2
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 123 16 61 21 0 35 0 580 42 85 716 0 Future Volume (veh/h) 123 16 61 21 0 35 0 580 42 85 716 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 0 1758 0 1758 1758 1660 1758 0 Adj Flow Rate, veh/h 156 0 48 22 0 37 0 611 44 89 754 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 3 3 3 3 0 3 0 3 3 3 3 0
Cap, veh/h 798 0 363 0 0 0 0 1395 100 399 1475 0
Arrive On Green 0.25 0.00 0.25 0.00 0.00 0.00 0.00 0.44 0.44 0.44 0.44 0.00 Sat Flow, veh/h 3162 0 1440 0 0 3246 227 689 3428 0
Grp Volume(v), veh/h 156 0 48 0.0 0 323 332 89 754 0
Grp Sat Flow(s),veh/h/ln 1581 0 1440 0 1670 1715 689 1670 0 Q Serve(g_s), s 1.5 0.0 1.0 0.0 5.2 5.2 4.0 6.3 0.0
Cycle Q Clear(g_c), s 1.5 0.0 1.0 0.0 5.2 5.2 9.1 6.3 0.0 Prop In Lane 1.00 1.00 0.00 0.13 1.00 0.00
Lane Grp Cap(c), veh/h 798 0 363 0 738 757 399 1475 0
V/C Ratio(X) 0.20 0.00 0.13 0.00 0.44 0.44 0.22 0.51 0.00 Avail Cap(c_a), veh/h 2132 0 971 0 1299 1334 630 2599 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 11.3 0.0 11.1 0.0 7.5 7.5 10.6 7.8 0.0 Incr Delay (d2), s/veh 0.1 0.0 0.2 0.0 0.4 0.4 0.3 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 0.3 0.0 1.3 1.4 0.5 1.6 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 11.5 0.0 11.3 0.0 7.9 7.9 10.9 8.0 0.0 LnGrp LOS B B A A B A
Approach Vol, veh/h 204 655 843
Approach Delay, s/veh 11.4 7.9 8.3
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 20.9 17.6 20.9
Change Period (Y+Rc), s 3.9 7.9 3.9
Max Green Setting (Gmax), s 30.0 26.0 30.0
Max Q Clear Time (g_c+I1), s 7.2 3.5 11.1
Green Ext Time (p_c), s 4.2 0.7 5.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.5
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 103 16 75 12 10 13 323 460 60 73 495 232 Future Volume (veh/h) 103 16 75 12 10 13 323 460 60 73 495 232 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 116 18 8 13 11 2 363 517 58 82 556 192 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 247 250 209 242 205 37 546 2254 252 517 1427 491 Arrive On Green 0.14 0.14 0.14 0.14 0.14 0.14 0.11 0.74 0.74 0.59 0.59 0.59 Sat Flow, veh/h 1231 1758 1474 1217 1441 262 1581 3026 338 742 2419 832 Grp Volume(v), veh/h 116 18 8 13 0 13 363 285 290 82 383 365 Grp Sat Flow(s),veh/h/ln 1231 1758 1474 1217 0 1703 1581 1670 1695 742 1670 1581 Q Serve(g_s), s 8.1 0.8 0.4 0.8 0.0 0.6 7.5 4.7 4.8 4.6 11.0 11.1 Cycle Q Clear(g_c), s 8.7 0.8 0.4 1.6 0.0 0.6 7.5 4.7 4.8 4.6 11.0 11.1 Prop In Lane 1.00 1.00 1.00 0.15 1.00 0.20 1.00 0.53
Lane Grp Cap(c), veh/h 247 250 209 242 0 242 546 1244 1262 517 985 933 V/C Ratio(X) 0.47 0.07 0.04 0.05 0.00 0.05 0.66 0.23 0.23 0.16 0.39 0.39 Avail Cap(c_a), veh/h 429 510 427 422 0 494 581 1244 1262 517 985 933 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.80 0.80 0.80 0.91 0.91 0.91 Uniform Delay (d), s/veh 37.1 33.5 33.3 34.2 0.0 33.4 6.8 3.5 3.5 8.5 9.8 9.8 Incr Delay (d2), s/veh 2.0 0.2 0.1 0.1 0.0 0.1 1.9 0.3 0.3 0.6 1.1 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.4 0.2 0.3 0.0 0.3 2.2 1.3 1.3 0.8 4.0 3.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.1 33.6 33.4 34.3 0.0 33.5 8.7 3.9 3.9 9.1 10.9 11.0 LnGrp LOS D C C C C AAAABB
Approach Vol, veh/h 142 26 938 830
Approach Delay, s/veh 38.1 33.9 5.7 10.7
Approach LOS D C A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.9 18.1 13.9 58.0 18.1
Change Period (Y+Rc), s 4.9 5.3 4.2 4.9 5.3
Max Green Setting (Gmax), s 53.7 26.1 11.7 37.8 26.1
Max Q Clear Time (g_c+I1), s 6.8 10.7 9.5 13.1 3.6
Green Ext Time (p_c), s 5.9 0.6 0.2 8.2 0.1
Intersection Summary
HCM 7th Control Delay, s/veh 10.6
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 7: Hill Ave & Del Mar Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 108 427 24 11 814 243 115 448 30 143 250 189 Future Volume (veh/h) 108 427 24 11 814 243 115 448 30 143 250 189 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 0.99 0.97 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 111 440 22 11 839 70 119 462 27 147 258 74 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 166 1095 55 166 1131 492 296 737 43 348 1023 286 Arrive On Green 0.10 0.34 0.34 0.10 0.34 0.34 0.23 0.23 0.23 0.12 0.40 0.40 Sat Flow, veh/h 1581 3233 161 1581 3340 1453 920 3201 187 1581 2561 717 Grp Volume(v), veh/h 111 227 235 11 839 70 119 240 249 147 166 166 Grp Sat Flow(s),veh/h/ln 1581 1670 1725 1581 1670 1453 920 1670 1718 1581 1670 1608 Q Serve(g_s), s 5.8 8.9 9.0 0.5 19.0 2.9 9.8 11.1 11.2 5.5 5.7 5.9 Cycle Q Clear(g_c), s 5.8 8.9 9.0 0.5 19.0 2.9 9.8 11.1 11.2 5.5 5.7 5.9 Prop In Lane 1.00 0.09 1.00 1.00 1.00 0.11 1.00 0.45
Lane Grp Cap(c), veh/h 166 565 584 166 1131 492 296 385 396 348 667 642 V/C Ratio(X) 0.67 0.40 0.40 0.07 0.74 0.14 0.40 0.63 0.63 0.42 0.25 0.26 Avail Cap(c_a), veh/h 271 794 820 271 1588 691 410 592 608 435 667 642 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 37.0 21.7 21.7 34.6 25.1 19.7 29.2 29.7 29.7 20.0 17.2 17.3 Incr Delay (d2), s/veh 4.6 0.7 0.6 0.2 1.6 0.2 1.3 2.4 2.3 1.2 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 3.4 3.6 0.2 7.3 1.0 2.2 4.6 4.8 2.1 2.1 2.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 41.6 22.4 22.4 34.8 26.6 19.9 30.5 32.1 32.1 21.2 17.4 17.5 LnGrp LOS D C C C C B C C C C B B
Approach Vol, veh/h 573 920 608 479
Approach Delay, s/veh 26.1 26.2 31.7 18.6
Approach LOS C C C B
Timer - Assigned Phs 123456 8
Phs Duration (G+Y+Rc), s 13.5 33.6 14.5 24.3 13.5 33.6 38.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.7 40.8 14.7 30.4 14.7 40.8 30.4 Max Q Clear Time (g_c+I1), s 7.8 21.0 7.5 13.2 2.5 11.0 7.9 Green Ext Time (p_c), s 0.1 8.0 0.3 4.6 0.0 4.1 1.9
Intersection Summary
HCM 7th Control Delay, s/veh 26.1
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 1: Wilson Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 68 531 50 0 0 0 0 246 33 30 161 0 Future Volume (veh/h) 68 531 50 0 0 0 0 246 33 30 161 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.94 1.00 0.96 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 76 590 56 0 273 37 33 179 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 259 2006 189 0 655 534 117 554 0
Arrive On Green 0.49 0.49 0.49 0.00 0.37 0.37 0.37 0.37 0.00 Sat Flow, veh/h 527 4082 384 0 1758 1432 154 1486 0
Grp Volume(v), veh/h 250 230 242 0 273 37 212 0 0
Grp Sat Flow(s),veh/h/ln 1732 1600 1662 0 1758 1432 1640 0 0 Q Serve(g_s), s 6.0 6.0 6.1 0.0 8.1 1.2 0.0 0.0 0.0
Cycle Q Clear(g_c), s 6.0 6.0 6.1 0.0 8.1 1.2 6.0 0.0 0.0 Prop In Lane 0.30 0.23 0.00 1.00 0.16 0.00
Lane Grp Cap(c), veh/h 851 786 817 0 655 534 671 0 0
V/C Ratio(X) 0.29 0.29 0.30 0.00 0.42 0.07 0.32 0.00 0.00 Avail Cap(c_a), veh/h 851 786 817 0 655 534 671 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.6 10.6 10.6 0.0 16.3 14.1 15.7 0.0 0.0 Incr Delay (d2), s/veh 0.9 0.9 0.9 0.0 1.9 0.3 1.2 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.3 2.1 2.3 0.0 3.4 0.4 2.5 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 11.5 11.5 11.5 0.0 18.2 14.4 16.9 0.0 0.0 LnGrp LOS B B B B B B
Approach Vol, veh/h 722 310 212
Approach Delay, s/veh 11.5 17.8 16.9
Approach LOS B B B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 39.3 30.7 30.7
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 34.4 26.1 26.1
Max Q Clear Time (g_c+I1), s 8.1 8.0 10.1
Green Ext Time (p_c), s 0.9 0.2 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 14.0
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 2: Holliston Ave & Colorado Blvd Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 17 565 32 59 562 3 27 27 84 18 10 9 Future Volume (veh/h) 17 565 32 59 562 3 27 27 84 18 10 9 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.97 0.90 0.97 0.91 0.99 0.98 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 0.90 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1758 1758 1758 Adj Flow Rate, veh/h 18 582 28 61 579 2 28 28 69 19 10 5 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 197 944 45 186 1000 3 203 203 433 463 233 108 Arrive On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.58 0.58 0.58 0.58 0.58 0.58 Sat Flow, veh/h 718 3224 155 701 3413 12 253 347 740 673 398 185 Grp Volume(v), veh/h 18 301 309 61 283 298 125 0 0 34 0 0 Grp Sat Flow(s),veh/h/ln 718 1670 1709 701 1670 1754 1341 0 0 1255 0 0 Q Serve(g_s), s 1.8 12.4 12.5 6.6 11.6 11.6 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 13.3 12.4 12.5 19.1 11.6 11.6 3.2 0.0 0.0 0.8 0.0 0.0 Prop In Lane 1.00 0.09 1.00 0.01 0.22 0.55 0.56 0.15
Lane Grp Cap(c), veh/h 197 489 501 186 489 514 839 0 0 804 0 0 V/C Ratio(X) 0.09 0.62 0.62 0.33 0.58 0.58 0.15 0.00 0.00 0.04 0.00 0.00 Avail Cap(c_a), veh/h 203 503 515 192 503 529 839 0 0 804 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.92 0.92 0.92 0.92 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 29.8 24.4 24.4 32.6 24.1 24.1 7.6 0.0 0.0 7.1 0.0 0.0 Incr Delay (d2), s/veh 0.2 2.1 2.1 0.9 1.5 1.4 0.3 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 5.0 5.1 1.1 4.6 4.8 1.0 0.0 0.0 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.0 26.5 26.6 33.6 25.5 25.5 7.9 0.0 0.0 7.2 0.0 0.0 LnGrp LOS C C C C C C A A
Approach Vol, veh/h 628 642 125 34
Approach Delay, s/veh 26.6 26.3 7.9 7.2
Approach LOS C C A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 51.7 28.3 51.7 28.3
Change Period (Y+Rc), s 4.9 4.9 4.9 4.9
Max Green Setting (Gmax), s 46.1 24.1 46.1 24.1
Max Q Clear Time (g_c+I1), s 5.2 15.3 2.8 21.1
Green Ext Time (p_c), s 0.8 2.6 0.2 1.2
Intersection Summary
HCM 7th Control Delay, s/veh 24.4
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 3: Hill Ave & Colorado Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 149 456 64 117 418 197 59 644 278 121 343 118 Future Volume (veh/h) 149 456 64 117 418 197 59 644 278 121 343 118 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.95 0.99 0.95 0.99 0.96 0.99 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 154 470 15 121 431 107 61 664 133 125 354 88 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 436 1206 513 429 1166 494 338 881 376 274 735 180 Arrive On Green 0.11 0.36 0.36 0.10 0.35 0.35 0.08 0.26 0.26 0.10 0.28 0.28 Sat Flow, veh/h 1581 3340 1421 1581 3340 1415 1581 3340 1426 1581 2634 644 Grp Volume(v), veh/h 154 470 15 121 431 107 61 664 133 125 222 220 Grp Sat Flow(s),veh/h/ln 1581 1670 1421 1581 1670 1415 1581 1670 1426 1581 1670 1609 Q Serve(g_s), s 5.9 10.5 0.7 4.6 9.6 5.3 2.6 18.3 7.6 5.5 11.1 11.4 Cycle Q Clear(g_c), s 5.9 10.5 0.7 4.6 9.6 5.3 2.6 18.3 7.6 5.5 11.1 11.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.40
Lane Grp Cap(c), veh/h 436 1206 513 429 1166 494 338 881 376 274 466 449 V/C Ratio(X) 0.35 0.39 0.03 0.28 0.37 0.22 0.18 0.75 0.35 0.46 0.48 0.49 Avail Cap(c_a), veh/h 451 1206 513 463 1166 494 411 1039 444 323 519 500 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.62 0.62 0.62 1.00 1.00 1.00 0.77 0.77 0.77 1.00 1.00 1.00 Uniform Delay (d), s/veh 16.9 23.8 20.6 17.2 24.3 22.9 22.8 33.8 29.9 24.3 30.0 30.1 Incr Delay (d2), s/veh 0.3 0.6 0.1 0.4 0.9 1.0 0.2 2.9 0.9 1.2 1.6 1.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 4.2 0.2 1.7 3.9 1.9 1.0 7.6 2.7 2.1 4.6 4.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.2 24.4 20.7 17.5 25.2 23.9 23.0 36.7 30.8 25.5 31.6 31.9 LnGrp LOS B C C B C C C D C C C C
Approach Vol, veh/h 639 659 858 567
Approach Delay, s/veh 22.5 23.6 34.8 30.4
Approach LOS C C C C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.9 41.0 13.9 31.3 15.0 39.8 12.4 32.8 Change Period (Y+Rc), s 4.2 4.9 4.2 4.9 4.2 4.9 4.2 4.9 Max Green Setting (Gmax), s 11.8 26.1 12.8 31.1 11.8 26.1 12.8 31.1 Max Q Clear Time (g_c+I1), s 6.6 12.5 7.5 20.3 7.9 11.6 4.6 13.4 Green Ext Time (p_c), s 0.1 4.4 0.1 5.8 0.1 4.8 0.1 4.4 Intersection Summary
HCM 7th Control Delay, s/veh 28.3
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 4: Holliston Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 58 519 39 0 0 0 0 53 28 18 64 0
Future Volume (veh/h) 58 519 39 0 0 0 0 53 28 18 64 0
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 0.97 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 60 535 34 0 55 5 19 66 0
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 384 3423 216 0 137 12 70 134 0
Arrive On Green 0.80 0.80 0.80 0.00 0.10 0.10 0.10 0.10 0.00 Sat Flow, veh/h 481 4287 271 0 1424 129 223 1393 0
Grp Volume(v), veh/h 216 199 214 0 0 60 85 0 0
Grp Sat Flow(s),veh/h/ln 1734 1600 1706 0 0 1553 1616 0 0 Q Serve(g_s), s 2.6 2.6 2.6 0.0 0.0 3.3 1.2 0.0 0.0
Cycle Q Clear(g_c), s 2.6 2.6 2.6 0.0 0.0 3.3 4.5 0.0 0.0 Prop In Lane 0.28 0.16 0.00 0.08 0.22 0.00
Lane Grp Cap(c), veh/h 1384 1277 1362 0 0 149 204 0 0
V/C Ratio(X) 0.16 0.16 0.16 0.00 0.00 0.40 0.42 0.00 0.00 Avail Cap(c_a), veh/h 1384 1277 1362 0 0 312 373 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.96 0.96 0.96 0.00 0.00 1.00 0.93 0.00 0.00 Uniform Delay (d), s/veh 2.1 2.1 2.1 0.0 0.0 38.3 38.7 0.0 0.0 Incr Delay (d2), s/veh 0.2 0.2 0.2 0.0 0.0 1.7 1.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.6 0.7 0.0 0.0 1.3 1.9 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 2.3 2.3 2.3 0.0 0.0 40.0 40.0 0.0 0.0 LnGrp LOS A A A D D
Approach Vol, veh/h 629 60 85
Approach Delay, s/veh 2.3 40.0 40.0
Approach LOS A D D
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 76.8 13.2 13.2
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 62.4 18.1 18.1
Max Q Clear Time (g_c+I1), s 4.6 5.3 6.5
Green Ext Time (p_c), s 4.6 0.2 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 9.4
HCM 7th LOS A
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 276 6 205 65 0 54 0 676 28 18 531 0 Future Volume (veh/h) 276 6 205 65 0 54 0 676 28 18 531 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.96 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 0 1758 0 1758 1758 1660 1758 0 Adj Flow Rate, veh/h 372 0 151 71 0 59 0 735 30 20 577 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 3 3 0 3 0 3 3 3 3 0
Cap, veh/h 954 0 436 0 0 0 0 1234 50 318 1262 0
Arrive On Green 0.30 0.00 0.30 0.00 0.00 0.00 0.00 0.38 0.38 0.38 0.38 0.00 Sat Flow, veh/h 3162 0 1445 0 0 3353 133 622 3428 0
Grp Volume(v), veh/h 372 0 151 0.0 0 376 389 20 577 0
Grp Sat Flow(s),veh/h/ln 1581 0 1445 0 1670 1728 622 1670 0 Q Serve(g_s), s 3.4 0.0 3.0 0.0 6.7 6.7 1.0 4.8 0.0
Cycle Q Clear(g_c), s 3.4 0.0 3.0 0.0 6.7 6.7 7.6 4.8 0.0 Prop In Lane 1.00 1.00 0.00 0.08 1.00 0.00
Lane Grp Cap(c), veh/h 954 0 436 0 631 653 318 1262 0
V/C Ratio(X) 0.39 0.00 0.35 0.00 0.60 0.60 0.06 0.46 0.00 Avail Cap(c_a), veh/h 2231 0 1020 0 1360 1407 589 2719 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 10.2 0.0 10.0 0.0 9.2 9.2 12.3 8.6 0.0 Incr Delay (d2), s/veh 0.3 0.0 0.5 0.0 0.9 0.9 0.1 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 0.8 0.0 1.8 1.9 0.1 1.3 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 10.4 0.0 10.5 0.0 10.1 10.1 12.4 8.9 0.0 LnGrp LOS B B B B B A
Approach Vol, veh/h 523 765 597
Approach Delay, s/veh 10.5 10.1 9.0
Approach LOS B B A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 17.8 19.0 17.8
Change Period (Y+Rc), s 3.9 7.9 3.9
Max Green Setting (Gmax), s 30.0 26.0 30.0
Max Q Clear Time (g_c+I1), s 8.7 5.4 9.6
Green Ext Time (p_c), s 4.9 1.9 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 9.8
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 108 8 167 82 34 121 113 420 14 15 580 158 Future Volume (veh/h) 108 8 167 82 34 121 113 420 14 15 580 158 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 116 9 20 88 37 14 122 452 13 16 624 147 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 227 262 222 257 181 68 524 2446 70 571 1599 376 Arrive On Green 0.15 0.15 0.15 0.15 0.15 0.15 0.10 0.74 0.74 0.60 0.60 0.60 Sat Flow, veh/h 1202 1758 1490 1226 1215 460 1581 3315 95 823 2683 631 Grp Volume(v), veh/h 116 9 20 88 0 51 122 227 238 16 388 383 Grp Sat Flow(s),veh/h/ln 1202 1758 1490 1226 0 1675 1581 1670 1741 823 1670 1644 Q Serve(g_s), s 8.4 0.4 1.0 6.0 0.0 2.4 2.2 3.7 3.7 0.7 11.0 11.0 Cycle Q Clear(g_c), s 10.8 0.4 1.0 6.3 0.0 2.4 2.2 3.7 3.7 0.7 11.0 11.0 Prop In Lane 1.00 1.00 1.00 0.27 1.00 0.05 1.00 0.38
Lane Grp Cap(c), veh/h 227 262 222 257 0 249 524 1232 1284 571 995 980 V/C Ratio(X) 0.51 0.03 0.09 0.34 0.00 0.20 0.23 0.18 0.19 0.03 0.39 0.39 Avail Cap(c_a), veh/h 396 510 432 430 0 486 579 1232 1284 571 995 980 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.88 0.88 0.88 0.89 0.89 0.89 Uniform Delay (d), s/veh 38.4 32.8 33.0 35.5 0.0 33.6 5.2 3.6 3.6 7.5 9.6 9.6 Incr Delay (d2), s/veh 2.5 0.1 0.2 0.8 0.0 0.4 0.1 0.3 0.3 0.1 1.0 1.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.2 0.4 1.8 0.0 1.0 0.6 1.1 1.1 0.1 3.9 3.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.9 32.8 33.3 36.3 0.0 34.0 5.3 3.9 3.9 7.6 10.6 10.6 LnGrp LOS D C C D C AAAABB
Approach Vol, veh/h 145 139 587 787
Approach Delay, s/veh 39.4 35.4 4.2 10.5
Approach LOS D D A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.3 18.7 12.8 58.5 18.7
Change Period (Y+Rc), s 4.9 5.3 4.2 4.9 5.3
Max Green Setting (Gmax), s 53.7 26.1 11.7 37.8 26.1
Max Q Clear Time (g_c+I1), s 5.7 12.8 4.2 13.0 8.3
Green Ext Time (p_c), s 4.6 0.6 0.1 7.6 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 12.9
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Conditions (2025) 7: Hill Ave & Del Mar Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 102 866 28 43 493 196 38 237 35 411 337 130 Future Volume (veh/h) 102 866 28 43 493 196 38 237 35 411 337 130 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 0.98 0.95 0.98 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 111 941 28 47 536 59 41 258 26 447 366 102 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 153 1174 35 153 1185 511 235 599 60 443 1035 284 Arrive On Green 0.10 0.35 0.35 0.10 0.35 0.35 0.20 0.20 0.20 0.16 0.40 0.40 Sat Flow, veh/h 1581 3308 98 1581 3340 1440 804 3050 304 1581 2569 705 Grp Volume(v), veh/h 111 475 494 47 536 59 41 140 144 447 236 232 Grp Sat Flow(s),veh/h/ln 1581 1670 1736 1581 1670 1440 804 1670 1684 1581 1670 1603 Q Serve(g_s), s 6.3 23.8 23.8 2.6 11.5 2.6 4.0 6.8 7.0 14.7 9.1 9.4 Cycle Q Clear(g_c), s 6.3 23.8 23.8 2.6 11.5 2.6 4.0 6.8 7.0 14.7 9.1 9.4 Prop In Lane 1.00 0.06 1.00 1.00 1.00 0.18 1.00 0.44
Lane Grp Cap(c), veh/h 153 593 616 153 1185 511 235 328 330 443 673 646 V/C Ratio(X) 0.72 0.80 0.80 0.31 0.45 0.12 0.17 0.43 0.44 1.01 0.35 0.36 Avail Cap(c_a), veh/h 250 733 762 250 1467 632 341 546 551 443 673 646 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.8 27.0 27.0 39.1 23.0 20.2 31.6 32.8 32.8 29.4 19.3 19.4 Incr Delay (d2), s/veh 6.4 5.9 5.7 1.1 0.4 0.1 0.5 1.3 1.3 45.0 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 10.0 10.3 1.0 4.4 0.9 0.8 2.8 2.9 9.2 3.5 3.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 47.1 32.9 32.7 40.2 23.4 20.3 32.1 34.0 34.1 74.4 19.6 19.7 LnGrp LOS D C C D C C C C C F B B
Approach Vol, veh/h 1080 642 325 915
Approach Delay, s/veh 34.3 24.4 33.8 46.4
Approach LOS C C C D
Timer - Assigned Phs 123456 8
Phs Duration (G+Y+Rc), s 13.5 37.5 19.2 22.7 13.5 37.5 41.9 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.7 40.8 14.7 30.4 14.7 40.8 30.4 Max Q Clear Time (g_c+I1), s 8.3 13.5 16.7 9.0 4.6 25.8 11.4 Green Ext Time (p_c), s 0.1 5.6 0.0 2.6 0.0 7.1 2.7
Intersection Summary
HCM 7th Control Delay, s/veh 35.8
HCM 7th LOS D
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 1: Wilson Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 212 48 0 0 0 0 186 52 45 243 0 Future Volume (veh/h) 19 212 48 0 0 0 0 186 52 45 243 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.95 1.00 0.99 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 20 223 51 0 196 55 47 256 0
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 162 1789 387 0 681 573 121 579 0
Arrive On Green 0.48 0.48 0.48 0.00 0.39 0.39 0.39 0.39 0.00 Sat Flow, veh/h 340 3750 810 0 1758 1480 158 1495 0
Grp Volume(v), veh/h 102 93 98 0 196 55 303 0 0
Grp Sat Flow(s),veh/h/ln 1741 1600 1560 0 1758 1480 1653 0 0 Q Serve(g_s), s 2.3 2.3 2.5 0.0 5.4 1.7 0.0 0.0 0.0
Cycle Q Clear(g_c), s 2.3 2.3 2.5 0.0 5.4 1.7 8.9 0.0 0.0 Prop In Lane 0.20 0.52 0.00 1.00 0.16 0.00
Lane Grp Cap(c), veh/h 831 763 744 0 681 573 699 0 0
V/C Ratio(X) 0.12 0.12 0.13 0.00 0.29 0.10 0.43 0.00 0.00 Avail Cap(c_a), veh/h 831 763 744 0 681 573 699 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.2 10.2 10.2 0.0 14.8 13.7 15.9 0.0 0.0 Incr Delay (d2), s/veh 0.3 0.3 0.4 0.0 1.1 0.3 2.0 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.8 0.9 0.0 2.2 0.6 3.8 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 10.5 10.5 10.6 0.0 15.9 14.0 17.8 0.0 0.0 LnGrp LOS B B B B B B
Approach Vol, veh/h 294 251 303
Approach Delay, s/veh 10.5 15.5 17.8
Approach LOS B B B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 38.3 31.7 31.7
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 33.4 27.1 27.1
Max Q Clear Time (g_c+I1), s 4.5 10.9 7.4
Green Ext Time (p_c), s 0.4 0.4 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 14.6
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 2: Holliston Ave & Colorado Blvd Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 242 27 77 606 3 14 10 49 4 14 3 Future Volume (veh/h) 6 242 27 77 606 3 14 10 49 4 14 3 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.94 0.98 0.96 0.99 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 0.90 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1758 1758 1758 1758 1758 1758 Adj Flow Rate, veh/h 6 252 17 80 631 2 15 10 31 4 15 2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 149 803 54 272 867 3 252 173 457 197 685 87
Arrive On Green 0.25 0.25 0.25 0.25 0.25 0.25 0.62 0.62 0.62 0.62 0.62 0.62 Sat Flow, veh/h 698 3162 212 963 3415 11 313 278 733 229 1098 140 Grp Volume(v), veh/h 6 132 137 80 309 324 56 0 0 21 0 0 Grp Sat Flow(s),veh/h/ln 698 1670 1704 963 1670 1755 1324 0 0 1468 0 0 Q Serve(g_s), s 0.6 5.1 5.2 5.9 13.5 13.5 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 14.2 5.1 5.2 11.1 13.5 13.5 1.2 0.0 0.0 0.4 0.0 0.0 Prop In Lane 1.00 0.12 1.00 0.01 0.27 0.55 0.19 0.10
Lane Grp Cap(c), veh/h 149 424 433 272 424 446 883 0 0 969 0 0 V/C Ratio(X) 0.04 0.31 0.32 0.29 0.73 0.73 0.06 0.00 0.00 0.02 0.00 0.00 Avail Cap(c_a), veh/h 182 503 513 317 503 529 883 0 0 969 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.87 0.87 0.87 0.92 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 33.8 24.2 24.2 28.7 27.3 27.3 5.9 0.0 0.0 5.7 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.4 0.4 0.5 3.8 3.6 0.1 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 2.0 2.1 1.4 5.6 5.9 0.4 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 33.9 24.6 24.6 29.2 31.1 30.9 6.0 0.0 0.0 5.8 0.0 0.0 LnGrp LOS C C C C C C A A
Approach Vol, veh/h 275 713 56 21
Approach Delay, s/veh 24.8 30.8 6.0 5.8
Approach LOS C C A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 54.8 25.2 54.8 25.2
Change Period (Y+Rc), s 4.9 4.9 4.9 4.9
Max Green Setting (Gmax), s 46.1 24.1 46.1 24.1
Max Q Clear Time (g_c+I1), s 3.2 16.2 2.4 15.5
Green Ext Time (p_c), s 0.3 0.9 0.1 2.8
Intersection Summary
HCM 7th Control Delay, s/veh 27.5
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 3: Hill Ave & Colorado Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 98 160 24 149 522 159 64 558 112 144 653 161 Future Volume (veh/h) 98 160 24 149 522 159 64 558 112 144 653 161 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.96 0.98 0.96 1.00 0.98 0.99 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 104 170 7 159 555 88 68 594 35 153 695 151 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 376 1134 485 547 1117 478 236 939 411 316 799 174 Arrive On Green 0.10 0.34 0.34 0.10 0.33 0.33 0.08 0.28 0.28 0.10 0.29 0.29 Sat Flow, veh/h 1581 3340 1429 1581 3340 1428 1581 3340 1461 1581 2711 589 Grp Volume(v), veh/h 104 170 7 159 555 88 68 594 35 153 428 418 Grp Sat Flow(s),veh/h/ln 1581 1670 1429 1581 1670 1428 1581 1670 1461 1581 1670 1630 Q Serve(g_s), s 4.0 3.5 0.3 6.3 13.3 4.4 2.8 15.5 1.8 6.6 24.3 24.3 Cycle Q Clear(g_c), s 4.0 3.5 0.3 6.3 13.3 4.4 2.8 15.5 1.8 6.6 24.3 24.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.36
Lane Grp Cap(c), veh/h 376 1134 485 547 1117 478 236 939 411 316 492 481 V/C Ratio(X) 0.28 0.15 0.01 0.29 0.50 0.18 0.29 0.63 0.09 0.48 0.87 0.87 Avail Cap(c_a), veh/h 399 1134 485 578 1117 478 304 1039 454 363 519 507 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.96 0.96 0.96 1.00 1.00 1.00 0.94 0.94 0.94 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.9 23.0 21.9 17.9 26.6 23.6 24.0 31.4 26.5 22.8 33.4 33.4 Incr Delay (d2), s/veh 0.4 0.3 0.1 0.3 1.6 0.8 0.6 1.7 0.2 1.1 15.5 16.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.4 0.1 2.3 5.4 1.6 1.1 6.4 0.6 2.5 11.7 11.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 18.3 23.3 22.0 18.2 28.1 24.5 24.6 33.1 26.6 24.0 49.0 49.4 LnGrp LOS B C C B C C C C C C D D
Approach Vol, veh/h 281 802 697 999
Approach Delay, s/veh 21.4 25.8 31.9 45.3
Approach LOS C C C D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 14.1 38.8 14.1 33.0 14.6 38.3 12.7 34.4 Change Period (Y+Rc), s 4.2 4.9 4.2 4.9 4.2 4.9 4.2 4.9 Max Green Setting (Gmax), s 11.8 26.1 12.8 31.1 11.8 26.1 12.8 31.1 Max Q Clear Time (g_c+I1), s 8.3 5.5 8.6 17.5 6.0 15.3 4.8 26.3 Green Ext Time (p_c), s 0.1 1.7 0.1 5.6 0.1 4.8 0.1 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 33.9
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 4: Holliston Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 34 188 89 0 0 0 0 53 29 13 105 0 Future Volume (veh/h) 34 188 89 0 0 0 0 53 29 13 105 0
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 40 219 81 0 62 3 15 122 0
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 459 2502 872 0 162 8 56 174 0
Arrive On Green 0.79 0.79 0.79 0.00 0.11 0.11 0.11 0.11 0.00 Sat Flow, veh/h 584 3182 1109 0 1496 72 106 1609 0
Grp Volume(v), veh/h 118 109 113 0 0 65 137 0 0
Grp Sat Flow(s),veh/h/ln 1729 1600 1546 0 0 1569 1715 0 0 Q Serve(g_s), s 1.4 1.4 1.5 0.0 0.0 3.5 2.8 0.0 0.0
Cycle Q Clear(g_c), s 1.4 1.4 1.5 0.0 0.0 3.5 6.9 0.0 0.0 Prop In Lane 0.34 0.72 0.00 0.05 0.11 0.00
Lane Grp Cap(c), veh/h 1359 1258 1216 0 0 170 230 0 0
V/C Ratio(X) 0.09 0.09 0.09 0.00 0.00 0.38 0.60 0.00 0.00 Avail Cap(c_a), veh/h 1359 1258 1216 0 0 490 573 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 0.00 1.00 0.97 0.00 0.00 Uniform Delay (d), s/veh 2.2 2.2 2.2 0.0 0.0 37.3 38.8 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.1 0.2 0.0 0.0 1.4 2.4 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.4 0.4 0.0 0.0 1.4 3.1 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 2.3 2.3 2.4 0.0 0.0 38.8 41.2 0.0 0.0 LnGrp LOS A A A D D
Approach Vol, veh/h 340 65 137
Approach Delay, s/veh 2.3 38.8 41.2
Approach LOS A D D
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 75.7 14.3 14.3
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 52.4 28.1 28.1
Max Q Clear Time (g_c+I1), s 3.5 5.5 8.9
Green Ext Time (p_c), s 2.3 0.3 0.7
Intersection Summary
HCM 7th Control Delay, s/veh 16.5
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 131 16 70 21 0 35 0 580 42 85 737 0 Future Volume (veh/h) 131 16 70 21 0 35 0 580 42 85 737 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 0 1758 0 1758 1758 1660 1758 0 Adj Flow Rate, veh/h 168 0 55 22 0 37 0 611 44 89 776 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 3 3 3 3 0 3 0 3 3 3 3 0
Cap, veh/h 806 0 367 0 0 0 0 1398 101 397 1479 0
Arrive On Green 0.25 0.00 0.25 0.00 0.00 0.00 0.00 0.44 0.44 0.44 0.44 0.00 Sat Flow, veh/h 3162 0 1440 0 0 3246 227 689 3428 0
Grp Volume(v), veh/h 168 0 55 0.0 0 323 332 89 776 0
Grp Sat Flow(s),veh/h/ln 1581 0 1440 0 1670 1715 689 1670 0 Q Serve(g_s), s 1.6 0.0 1.2 0.0 5.2 5.2 4.0 6.6 0.0
Cycle Q Clear(g_c), s 1.6 0.0 1.2 0.0 5.2 5.2 9.2 6.6 0.0 Prop In Lane 1.00 1.00 0.00 0.13 1.00 0.00
Lane Grp Cap(c), veh/h 806 0 367 0 739 759 397 1479 0
V/C Ratio(X) 0.21 0.00 0.15 0.00 0.44 0.44 0.22 0.52 0.00 Avail Cap(c_a), veh/h 2106 0 959 0 1283 1318 622 2567 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 11.4 0.0 11.3 0.0 7.5 7.5 10.7 7.9 0.0 Incr Delay (d2), s/veh 0.1 0.0 0.2 0.0 0.4 0.4 0.3 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 0.3 0.0 1.3 1.4 0.5 1.7 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 11.6 0.0 11.5 0.0 7.9 7.9 11.0 8.2 0.0 LnGrp LOS B B A A B A
Approach Vol, veh/h 223 655 865
Approach Delay, s/veh 11.5 7.9 8.5
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 21.2 17.9 21.2
Change Period (Y+Rc), s 3.9 7.9 3.9
Max Green Setting (Gmax), s 30.0 26.0 30.0
Max Q Clear Time (g_c+I1), s 7.2 3.6 11.2
Green Ext Time (p_c), s 4.2 0.7 6.1
Intersection Summary
HCM 7th Control Delay, s/veh 8.7
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 103 16 75 12 10 13 335 460 60 73 501 256 Future Volume (veh/h) 103 16 75 12 10 13 335 460 60 73 501 256 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 116 18 5 13 11 2 376 517 58 82 563 217 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 246 249 209 242 204 37 536 2254 252 515 1372 527 Arrive On Green 0.14 0.14 0.14 0.14 0.14 0.14 0.11 0.74 0.74 0.59 0.59 0.59 Sat Flow, veh/h 1231 1758 1474 1220 1441 262 1581 3026 338 742 2338 898 Grp Volume(v), veh/h 116 18 5 13 0 13 376 285 290 82 402 378 Grp Sat Flow(s),veh/h/ln 1231 1758 1474 1220 0 1703 1581 1670 1695 742 1670 1566 Q Serve(g_s), s 8.1 0.8 0.3 0.8 0.0 0.6 7.8 4.7 4.7 4.6 11.8 11.8 Cycle Q Clear(g_c), s 8.7 0.8 0.3 1.6 0.0 0.6 7.8 4.7 4.7 4.6 11.8 11.8 Prop In Lane 1.00 1.00 1.00 0.15 1.00 0.20 1.00 0.57
Lane Grp Cap(c), veh/h 246 249 209 242 0 241 536 1244 1262 515 980 919 V/C Ratio(X) 0.47 0.07 0.02 0.05 0.00 0.05 0.70 0.23 0.23 0.16 0.41 0.41 Avail Cap(c_a), veh/h 429 510 427 423 0 494 565 1244 1262 515 980 919 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.80 0.80 0.80 0.91 0.91 0.91 Uniform Delay (d), s/veh 37.2 33.5 33.3 34.2 0.0 33.4 7.4 3.5 3.5 8.6 10.1 10.1 Incr Delay (d2), s/veh 2.0 0.2 0.1 0.1 0.0 0.1 2.7 0.3 0.3 0.6 1.2 1.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.4 0.1 0.3 0.0 0.3 2.4 1.3 1.3 0.8 4.3 4.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.1 33.7 33.3 34.3 0.0 33.5 10.1 3.9 3.9 9.2 11.3 11.4 LnGrp LOS D C C C C BAAABB
Approach Vol, veh/h 139 26 951 862
Approach Delay, s/veh 38.2 33.9 6.3 11.1
Approach LOS D C A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.9 18.1 14.2 57.7 18.1
Change Period (Y+Rc), s 4.9 5.3 4.2 4.9 5.3
Max Green Setting (Gmax), s 53.7 26.1 11.7 37.8 26.1
Max Q Clear Time (g_c+I1), s 6.7 10.7 9.8 13.8 3.6
Green Ext Time (p_c), s 5.9 0.6 0.2 8.5 0.1
Intersection Summary
HCM 7th Control Delay, s/veh 11.0
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 7: Hill Ave & Del Mar Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 108 427 24 11 818 243 119 460 30 144 253 191 Future Volume (veh/h) 108 427 24 11 818 243 119 460 30 144 253 191 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 0.99 0.97 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 111 440 22 11 843 79 123 474 27 148 261 75 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 165 1097 55 165 1133 493 297 746 42 345 1025 287 Arrive On Green 0.10 0.34 0.34 0.10 0.34 0.34 0.23 0.23 0.23 0.12 0.40 0.40 Sat Flow, veh/h 1581 3233 161 1581 3340 1453 917 3206 182 1581 2560 718 Grp Volume(v), veh/h 111 227 235 11 843 79 123 246 255 148 168 168 Grp Sat Flow(s),veh/h/ln 1581 1670 1725 1581 1670 1453 917 1670 1719 1581 1670 1608 Q Serve(g_s), s 5.8 9.0 9.0 0.5 19.3 3.3 10.3 11.5 11.5 5.6 5.8 6.0 Cycle Q Clear(g_c), s 5.8 9.0 9.0 0.5 19.3 3.3 10.3 11.5 11.5 5.6 5.8 6.0 Prop In Lane 1.00 0.09 1.00 1.00 1.00 0.11 1.00 0.45
Lane Grp Cap(c), veh/h 165 567 585 165 1133 493 297 388 400 345 669 644 V/C Ratio(X) 0.67 0.40 0.40 0.07 0.74 0.16 0.41 0.63 0.64 0.43 0.25 0.26 Avail Cap(c_a), veh/h 269 788 814 269 1577 686 406 587 604 431 669 644 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 37.3 21.8 21.8 34.9 25.2 19.9 29.4 29.9 29.9 20.1 17.3 17.4 Incr Delay (d2), s/veh 4.7 0.7 0.6 0.2 1.6 0.2 1.3 2.4 2.4 1.2 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 3.5 3.6 0.2 7.5 1.1 2.3 4.7 4.9 2.1 2.2 2.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 42.0 22.5 22.5 35.1 26.8 20.2 30.7 32.3 32.3 21.3 17.5 17.6 LnGrp LOS D C C D C C C C C C B B
Approach Vol, veh/h 573 933 624 484
Approach Delay, s/veh 26.3 26.4 32.0 18.7
Approach LOS C C C B
Timer - Assigned Phs 123456 8
Phs Duration (G+Y+Rc), s 13.5 33.8 14.5 24.6 13.5 33.8 39.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.7 40.8 14.7 30.4 14.7 40.8 30.4 Max Q Clear Time (g_c+I1), s 7.8 21.3 7.6 13.5 2.5 11.0 8.0 Green Ext Time (p_c), s 0.1 8.1 0.3 4.7 0.0 4.1 2.0
Intersection Summary
HCM 7th Control Delay, s/veh 26.3
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 1: Wilson Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 68 533 50 0 0 0 0 246 34 31 161 0 Future Volume (veh/h) 68 533 50 0 0 0 0 246 34 31 161 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.94 1.00 0.96 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 76 592 56 0 273 38 34 179 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 258 2008 188 0 655 534 119 550 0
Arrive On Green 0.49 0.49 0.49 0.00 0.37 0.37 0.37 0.37 0.00 Sat Flow, veh/h 525 4085 383 0 1758 1432 160 1476 0
Grp Volume(v), veh/h 251 231 243 0 273 38 213 0 0
Grp Sat Flow(s),veh/h/ln 1732 1600 1662 0 1758 1432 1636 0 0 Q Serve(g_s), s 6.0 6.0 6.1 0.0 8.1 1.2 0.0 0.0 0.0
Cycle Q Clear(g_c), s 6.0 6.0 6.1 0.0 8.1 1.2 6.1 0.0 0.0 Prop In Lane 0.30 0.23 0.00 1.00 0.16 0.00
Lane Grp Cap(c), veh/h 851 786 817 0 655 534 669 0 0
V/C Ratio(X) 0.29 0.29 0.30 0.00 0.42 0.07 0.32 0.00 0.00 Avail Cap(c_a), veh/h 851 786 817 0 655 534 669 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.6 10.6 10.6 0.0 16.3 14.1 15.7 0.0 0.0 Incr Delay (d2), s/veh 0.9 0.9 0.9 0.0 1.9 0.3 1.2 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.3 2.1 2.3 0.0 3.4 0.4 2.5 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 11.5 11.5 11.5 0.0 18.2 14.4 16.9 0.0 0.0 LnGrp LOS B B B B B B
Approach Vol, veh/h 724 311 213
Approach Delay, s/veh 11.5 17.8 16.9
Approach LOS B B B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 39.3 30.7 30.7
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 34.4 26.1 26.1
Max Q Clear Time (g_c+I1), s 8.1 8.1 10.1
Green Ext Time (p_c), s 0.9 0.2 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 14.0
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 2: Holliston Ave & Colorado Blvd Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 17 565 33 60 568 7 27 27 84 18 11 9 Future Volume (veh/h) 17 565 33 60 568 7 27 27 84 18 11 9 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.97 0.90 0.97 0.91 0.99 0.98 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 0.90 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1758 1758 1758 1758 1758 1758 Adj Flow Rate, veh/h 18 582 28 62 586 6 28 28 66 19 11 6 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 193 946 45 186 992 10 208 207 424 441 244 123 Arrive On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.58 0.58 0.58 0.58 0.58 0.58 Sat Flow, veh/h 712 3224 155 701 3383 35 261 354 725 637 418 211 Grp Volume(v), veh/h 18 301 309 62 289 303 122 0 0 36 0 0 Grp Sat Flow(s),veh/h/ln 712 1670 1709 701 1670 1748 1340 0 0 1265 0 0 Q Serve(g_s), s 1.8 12.4 12.5 6.7 11.8 11.9 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 13.6 12.4 12.5 19.2 11.8 11.9 3.1 0.0 0.0 0.8 0.0 0.0 Prop In Lane 1.00 0.09 1.00 0.02 0.23 0.54 0.53 0.17
Lane Grp Cap(c), veh/h 193 490 501 186 490 513 838 0 0 808 0 0 V/C Ratio(X) 0.09 0.61 0.62 0.33 0.59 0.59 0.15 0.00 0.00 0.04 0.00 0.00 Avail Cap(c_a), veh/h 199 503 515 192 503 527 838 0 0 808 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.92 0.92 0.92 0.92 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 30.0 24.4 24.4 32.7 24.2 24.2 7.6 0.0 0.0 7.1 0.0 0.0 Incr Delay (d2), s/veh 0.2 2.1 2.1 1.0 1.6 1.5 0.3 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 5.0 5.1 1.2 4.7 4.9 1.0 0.0 0.0 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.2 26.5 26.5 33.6 25.8 25.7 7.9 0.0 0.0 7.2 0.0 0.0 LnGrp LOS C C C C C C A A
Approach Vol, veh/h 628 654 122 36
Approach Delay, s/veh 26.6 26.5 7.9 7.2
Approach LOS C C A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 51.6 28.4 51.6 28.4
Change Period (Y+Rc), s 4.9 4.9 4.9 4.9
Max Green Setting (Gmax), s 46.1 24.1 46.1 24.1
Max Q Clear Time (g_c+I1), s 5.1 15.6 2.8 21.2
Green Ext Time (p_c), s 0.8 2.5 0.2 1.2
Intersection Summary
HCM 7th Control Delay, s/veh 24.5
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 3: Hill Ave & Colorado Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 149 456 64 118 418 197 69 663 287 121 345 119 Future Volume (veh/h) 149 456 64 118 418 197 69 663 287 121 345 119 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.95 0.99 0.95 0.99 0.96 0.99 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 154 470 19 122 431 108 71 684 142 125 356 89 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 433 1193 507 425 1154 488 343 893 381 271 732 180 Arrive On Green 0.11 0.36 0.36 0.10 0.35 0.35 0.09 0.27 0.27 0.10 0.28 0.28 Sat Flow, veh/h 1581 3340 1421 1581 3340 1414 1581 3340 1427 1581 2631 647 Grp Volume(v), veh/h 154 470 19 122 431 108 71 684 142 125 224 221 Grp Sat Flow(s),veh/h/ln 1581 1670 1421 1581 1670 1414 1581 1670 1427 1581 1670 1608 Q Serve(g_s), s 5.9 10.5 0.9 4.7 9.7 5.4 3.0 18.9 8.1 5.5 11.2 11.5 Cycle Q Clear(g_c), s 5.9 10.5 0.9 4.7 9.7 5.4 3.0 18.9 8.1 5.5 11.2 11.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.40
Lane Grp Cap(c), veh/h 433 1193 507 425 1154 488 343 893 381 271 464 447 V/C Ratio(X) 0.36 0.39 0.04 0.29 0.37 0.22 0.21 0.77 0.37 0.46 0.48 0.49 Avail Cap(c_a), veh/h 448 1193 507 459 1154 488 409 1039 444 320 519 500 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.62 0.62 0.62 1.00 1.00 1.00 0.76 0.76 0.76 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.1 24.0 20.9 17.4 24.6 23.2 22.5 33.8 29.8 24.2 30.1 30.2 Incr Delay (d2), s/veh 0.3 0.6 0.1 0.4 0.9 1.0 0.2 3.1 1.0 1.2 1.7 1.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 4.2 0.3 1.7 3.9 1.9 1.1 7.9 2.9 2.1 4.6 4.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.4 24.6 21.0 17.8 25.5 24.2 22.7 36.9 30.8 25.4 31.8 32.0 LnGrp LOS B C C B C C C D C C C C
Approach Vol, veh/h 643 661 897 570
Approach Delay, s/veh 22.8 23.9 34.8 30.5
Approach LOS C C C C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.9 40.6 13.9 31.6 15.0 39.4 12.8 32.7 Change Period (Y+Rc), s 4.2 4.9 4.2 4.9 4.2 4.9 4.2 4.9 Max Green Setting (Gmax), s 11.8 26.1 12.8 31.1 11.8 26.1 12.8 31.1 Max Q Clear Time (g_c+I1), s 6.7 12.5 7.5 20.9 7.9 11.7 5.0 13.5 Green Ext Time (p_c), s 0.1 4.4 0.1 5.7 0.1 4.8 0.1 4.5 Intersection Summary
HCM 7th Control Delay, s/veh 28.5
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 4: Holliston Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 58 519 43 0 0 0 0 53 28 18 67 0
Future Volume (veh/h) 58 519 43 0 0 0 0 53 28 18 67 0
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 0.97 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 60 535 38 0 55 5 19 69 0
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 381 3397 240 0 137 12 69 135 0
Arrive On Green 0.80 0.80 0.80 0.00 0.10 0.10 0.10 0.10 0.00 Sat Flow, veh/h 477 4256 301 0 1424 129 216 1404 0
Grp Volume(v), veh/h 218 200 215 0 0 60 88 0 0
Grp Sat Flow(s),veh/h/ln 1734 1600 1700 0 0 1553 1620 0 0 Q Serve(g_s), s 2.6 2.6 2.6 0.0 0.0 3.3 1.4 0.0 0.0
Cycle Q Clear(g_c), s 2.6 2.6 2.6 0.0 0.0 3.3 4.6 0.0 0.0 Prop In Lane 0.28 0.18 0.00 0.08 0.22 0.00
Lane Grp Cap(c), veh/h 1384 1277 1357 0 0 149 204 0 0
V/C Ratio(X) 0.16 0.16 0.16 0.00 0.00 0.40 0.43 0.00 0.00 Avail Cap(c_a), veh/h 1384 1277 1357 0 0 312 373 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.96 0.96 0.96 0.00 0.00 1.00 0.93 0.00 0.00 Uniform Delay (d), s/veh 2.1 2.1 2.1 0.0 0.0 38.2 38.8 0.0 0.0 Incr Delay (d2), s/veh 0.2 0.3 0.2 0.0 0.0 1.7 1.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.6 0.7 0.0 0.0 1.3 1.9 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 2.3 2.3 2.3 0.0 0.0 40.0 40.1 0.0 0.0 LnGrp LOS A A A D D
Approach Vol, veh/h 633 60 88
Approach Delay, s/veh 2.3 40.0 40.1
Approach LOS A D D
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 76.7 13.3 13.3
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 62.4 18.1 18.1
Max Q Clear Time (g_c+I1), s 4.6 5.3 6.6
Green Ext Time (p_c), s 4.6 0.2 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 9.5
HCM 7th LOS A
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 314 6 244 65 0 54 0 676 28 18 534 0 Future Volume (veh/h) 314 6 244 65 0 54 0 676 28 18 534 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.96 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 0 1758 0 1758 1758 1660 1758 0 Adj Flow Rate, veh/h 426 0 179 71 0 59 0 735 30 20 580 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 3 3 0 3 0 3 3 3 3 0
Cap, veh/h 956 0 437 0 0 0 0 1233 50 318 1262 0
Arrive On Green 0.30 0.00 0.30 0.00 0.00 0.00 0.00 0.38 0.38 0.38 0.38 0.00 Sat Flow, veh/h 3162 0 1445 0 0 3353 133 622 3428 0
Grp Volume(v), veh/h 426 0 179 0.0 0 376 389 20 580 0
Grp Sat Flow(s),veh/h/ln 1581 0 1445 0 1670 1728 622 1670 0 Q Serve(g_s), s 4.0 0.0 3.6 0.0 6.7 6.7 1.0 4.8 0.0
Cycle Q Clear(g_c), s 4.0 0.0 3.6 0.0 6.7 6.7 7.7 4.8 0.0 Prop In Lane 1.00 1.00 0.00 0.08 1.00 0.00
Lane Grp Cap(c), veh/h 956 0 437 0 631 653 318 1262 0
V/C Ratio(X) 0.45 0.00 0.41 0.00 0.60 0.60 0.06 0.46 0.00 Avail Cap(c_a), veh/h 2230 0 1019 0 1359 1406 589 2717 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 10.4 0.0 10.2 0.0 9.2 9.2 12.3 8.6 0.0 Incr Delay (d2), s/veh 0.3 0.0 0.6 0.0 0.9 0.9 0.1 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 1.0 0.0 1.8 1.9 0.1 1.3 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 10.7 0.0 10.9 0.0 10.1 10.1 12.4 8.9 0.0 LnGrp LOS B B B B B A
Approach Vol, veh/h 605 765 600
Approach Delay, s/veh 10.8 10.1 9.0
Approach LOS B B A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 17.8 19.0 17.8
Change Period (Y+Rc), s 3.9 7.9 3.9
Max Green Setting (Gmax), s 30.0 26.0 30.0
Max Q Clear Time (g_c+I1), s 8.7 6.0 9.7
Green Ext Time (p_c), s 4.9 2.2 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 10.0
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 108 8 167 82 34 121 115 420 14 15 607 173 Future Volume (veh/h) 108 8 167 82 34 121 115 420 14 15 607 173 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 116 9 21 88 37 15 124 452 13 16 653 162 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 227 263 223 258 178 72 506 2444 70 570 1578 391 Arrive On Green 0.15 0.15 0.15 0.15 0.15 0.15 0.10 0.74 0.74 0.59 0.59 0.59 Sat Flow, veh/h 1201 1758 1490 1225 1189 482 1581 3315 95 823 2652 657 Grp Volume(v), veh/h 116 9 21 88 0 52 124 227 238 16 411 404 Grp Sat Flow(s),veh/h/ln 1201 1758 1490 1225 0 1671 1581 1670 1741 823 1670 1640 Q Serve(g_s), s 8.4 0.4 1.1 6.0 0.0 2.5 2.2 3.7 3.7 0.7 11.9 11.9 Cycle Q Clear(g_c), s 10.9 0.4 1.1 6.4 0.0 2.5 2.2 3.7 3.7 0.7 11.9 11.9 Prop In Lane 1.00 1.00 1.00 0.29 1.00 0.05 1.00 0.40
Lane Grp Cap(c), veh/h 227 263 223 258 0 250 506 1231 1283 570 994 975 V/C Ratio(X) 0.51 0.03 0.09 0.34 0.00 0.21 0.24 0.18 0.19 0.03 0.41 0.41 Avail Cap(c_a), veh/h 395 510 432 430 0 485 561 1231 1283 570 994 975 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.88 0.88 0.88 0.89 0.89 0.89 Uniform Delay (d), s/veh 38.4 32.7 33.0 35.4 0.0 33.6 5.4 3.6 3.6 7.5 9.8 9.8 Incr Delay (d2), s/veh 2.5 0.1 0.3 0.8 0.0 0.4 0.2 0.3 0.3 0.1 1.1 1.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.2 0.4 1.8 0.0 1.0 0.6 1.1 1.1 0.1 4.3 4.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.9 32.8 33.3 36.2 0.0 34.0 5.6 3.9 3.9 7.6 10.9 11.0 LnGrp LOS D C C D C AAAABB
Approach Vol, veh/h 146 140 589 831
Approach Delay, s/veh 39.3 35.4 4.2 10.9
Approach LOS D D A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.2 18.8 12.8 58.4 18.8
Change Period (Y+Rc), s 4.9 5.3 4.2 4.9 5.3
Max Green Setting (Gmax), s 53.7 26.1 11.7 37.8 26.1
Max Q Clear Time (g_c+I1), s 5.7 12.9 4.2 13.9 8.4
Green Ext Time (p_c), s 4.6 0.6 0.1 8.0 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 13.0
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Existing Plus Project Conditions (2025) 7: Hill Ave & Del Mar Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 102 866 28 43 494 196 39 239 35 415 352 138 Future Volume (veh/h) 102 866 28 43 494 196 39 239 35 415 352 138 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 0.98 0.95 0.98 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 111 941 28 47 537 60 42 260 26 451 383 110 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 153 1174 35 153 1185 511 232 600 59 443 1027 291 Arrive On Green 0.10 0.35 0.35 0.10 0.35 0.35 0.20 0.20 0.20 0.16 0.40 0.40 Sat Flow, veh/h 1581 3308 98 1581 3340 1440 786 3052 302 1581 2548 721 Grp Volume(v), veh/h 111 475 494 47 537 60 42 141 145 451 249 244 Grp Sat Flow(s),veh/h/ln 1581 1670 1736 1581 1670 1440 786 1670 1684 1581 1670 1600 Q Serve(g_s), s 6.3 23.9 23.9 2.6 11.5 2.6 4.2 6.9 7.0 14.7 9.7 10.0 Cycle Q Clear(g_c), s 6.3 23.9 23.9 2.6 11.5 2.6 4.2 6.9 7.0 14.7 9.7 10.0 Prop In Lane 1.00 0.06 1.00 1.00 1.00 0.18 1.00 0.45
Lane Grp Cap(c), veh/h 153 593 616 153 1185 511 232 328 331 443 673 645 V/C Ratio(X) 0.73 0.80 0.80 0.31 0.45 0.12 0.18 0.43 0.44 1.02 0.37 0.38 Avail Cap(c_a), veh/h 250 733 762 250 1466 632 335 546 551 443 673 645 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.8 27.0 27.0 39.1 23.1 20.2 31.7 32.8 32.8 29.4 19.5 19.5 Incr Delay (d2), s/veh 6.4 5.9 5.7 1.1 0.4 0.1 0.5 1.3 1.3 47.7 0.3 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 10.0 10.3 1.0 4.4 0.9 0.8 2.9 3.0 9.6 3.7 3.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 47.2 33.0 32.7 40.2 23.4 20.3 32.2 34.0 34.1 77.1 19.8 19.9 LnGrp LOS D C C D C C C C C F B B
Approach Vol, veh/h 1080 644 328 944
Approach Delay, s/veh 34.3 24.4 33.8 47.2
Approach LOS C C C D
Timer - Assigned Phs 123456 8
Phs Duration (G+Y+Rc), s 13.5 37.5 19.2 22.8 13.5 37.5 42.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.7 40.8 14.7 30.4 14.7 40.8 30.4 Max Q Clear Time (g_c+I1), s 8.3 13.5 16.7 9.0 4.6 25.9 12.0 Green Ext Time (p_c), s 0.1 5.6 0.0 2.6 0.0 7.1 2.9
Intersection Summary
HCM 7th Control Delay, s/veh 36.2
HCM 7th LOS D
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 1: Wilson Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 203 49 0 0 0 0 189 49 42 246 0 Future Volume (veh/h) 19 203 49 0 0 0 0 189 49 42 246 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.95 1.00 0.99 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 20 214 52 0 199 52 44 259 0
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 167 1764 403 0 681 573 115 588 0
Arrive On Green 0.48 0.48 0.48 0.00 0.39 0.39 0.39 0.39 0.00 Sat Flow, veh/h 350 3697 845 0 1758 1480 144 1519 0
Grp Volume(v), veh/h 100 91 95 0 199 52 303 0 0
Grp Sat Flow(s),veh/h/ln 1740 1600 1552 0 1758 1480 1663 0 0 Q Serve(g_s), s 2.2 2.2 2.4 0.0 5.5 1.6 0.0 0.0 0.0
Cycle Q Clear(g_c), s 2.2 2.2 2.4 0.0 5.5 1.6 8.9 0.0 0.0 Prop In Lane 0.20 0.54 0.00 1.00 0.15 0.00
Lane Grp Cap(c), veh/h 830 763 740 0 681 573 703 0 0
V/C Ratio(X) 0.12 0.12 0.13 0.00 0.29 0.09 0.43 0.00 0.00 Avail Cap(c_a), veh/h 830 763 740 0 681 573 703 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.1 10.1 10.2 0.0 14.8 13.6 15.9 0.0 0.0 Incr Delay (d2), s/veh 0.3 0.3 0.4 0.0 1.1 0.3 1.9 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.8 0.8 0.0 2.3 0.5 3.8 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 10.4 10.5 10.6 0.0 15.9 13.9 17.8 0.0 0.0 LnGrp LOS B B B B B B
Approach Vol, veh/h 286 251 303
Approach Delay, s/veh 10.5 15.5 17.8
Approach LOS B B B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 38.3 31.7 31.7
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 33.4 27.1 27.1
Max Q Clear Time (g_c+I1), s 4.4 10.9 7.5
Green Ext Time (p_c), s 0.3 0.4 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 14.6
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 2: Holliston Ave & Colorado Blvd Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 245 21 70 613 2 14 10 50 4 10 3 Future Volume (veh/h) 6 245 21 70 613 2 14 10 50 4 10 3 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.94 0.98 0.96 0.99 0.98 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 0.90 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1758 1758 1758 1758 1758 1758 Adj Flow Rate, veh/h 6 255 14 73 639 2 15 10 31 4 10 2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 148 819 45 273 871 3 252 173 457 250 585 111 Arrive On Green 0.26 0.26 0.26 0.26 0.26 0.26 0.62 0.62 0.62 0.62 0.62 0.62 Sat Flow, veh/h 693 3208 175 963 3415 11 313 279 734 311 940 179 Grp Volume(v), veh/h 6 132 137 73 312 329 56 0 0 16 0 0 Grp Sat Flow(s),veh/h/ln 693 1670 1713 963 1670 1755 1326 0 0 1429 0 0 Q Serve(g_s), s 0.6 5.1 5.2 5.3 13.7 13.7 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 14.4 5.1 5.2 10.5 13.7 13.7 1.2 0.0 0.0 0.3 0.0 0.0 Prop In Lane 1.00 0.10 1.00 0.01 0.27 0.55 0.25 0.12
Lane Grp Cap(c), veh/h 148 426 437 273 426 448 882 0 0 946 0 0 V/C Ratio(X) 0.04 0.31 0.31 0.27 0.73 0.73 0.06 0.00 0.00 0.02 0.00 0.00 Avail Cap(c_a), veh/h 180 503 516 318 503 529 882 0 0 946 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.87 0.87 0.87 0.90 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 33.9 24.1 24.1 28.4 27.3 27.3 5.9 0.0 0.0 5.8 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.4 0.4 0.5 4.0 3.8 0.1 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 2.0 2.1 1.2 5.7 6.0 0.4 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.0 24.5 24.5 28.8 31.3 31.1 6.1 0.0 0.0 5.8 0.0 0.0 LnGrp LOS C C C C C C A A
Approach Vol, veh/h 275 714 56 16
Approach Delay, s/veh 24.7 30.9 6.1 5.8
Approach LOS C C A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 54.7 25.3 54.7 25.3
Change Period (Y+Rc), s 4.9 4.9 4.9 4.9
Max Green Setting (Gmax), s 46.1 24.1 46.1 24.1
Max Q Clear Time (g_c+I1), s 3.2 16.4 2.3 15.7
Green Ext Time (p_c), s 0.3 0.9 0.1 2.8
Intersection Summary
HCM 7th Control Delay, s/veh 27.6
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 3: Hill Ave & Colorado Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 99 162 24 142 529 161 63 562 112 146 650 155 Future Volume (veh/h) 99 162 24 142 529 161 63 562 112 146 650 155 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.96 0.98 0.96 1.00 0.98 0.99 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 105 172 7 151 563 90 67 598 35 155 691 144 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 376 1143 489 549 1124 481 237 931 407 313 801 167 Arrive On Green 0.10 0.34 0.34 0.10 0.34 0.34 0.08 0.28 0.28 0.10 0.29 0.29 Sat Flow, veh/h 1581 3340 1429 1581 3340 1428 1581 3340 1461 1581 2735 569 Grp Volume(v), veh/h 105 172 7 151 563 90 67 598 35 155 422 413 Grp Sat Flow(s),veh/h/ln 1581 1670 1429 1581 1670 1428 1581 1670 1461 1581 1670 1634 Q Serve(g_s), s 4.0 3.6 0.3 6.0 13.4 4.5 2.8 15.7 1.8 6.8 23.9 23.9 Cycle Q Clear(g_c), s 4.0 3.6 0.3 6.0 13.4 4.5 2.8 15.7 1.8 6.8 23.9 23.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.35
Lane Grp Cap(c), veh/h 376 1143 489 549 1124 481 237 931 407 313 489 479 V/C Ratio(X) 0.28 0.15 0.01 0.28 0.50 0.19 0.28 0.64 0.09 0.50 0.86 0.86 Avail Cap(c_a), veh/h 398 1143 489 580 1124 481 306 1039 454 359 519 508 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.96 0.96 0.96 1.00 1.00 1.00 0.94 0.94 0.94 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.8 22.8 21.7 17.7 26.5 23.5 24.0 31.7 26.7 23.1 33.4 33.5 Incr Delay (d2), s/veh 0.4 0.3 0.1 0.3 1.6 0.9 0.6 1.8 0.2 1.2 14.8 15.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.4 0.1 2.2 5.5 1.6 1.1 6.5 0.6 2.6 11.5 11.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 18.2 23.1 21.8 18.0 28.1 24.3 24.7 33.4 26.8 24.3 48.3 48.7 LnGrp LOS B C C B C C C C C C D D
Approach Vol, veh/h 284 804 700 990
Approach Delay, s/veh 21.2 25.7 32.3 44.7
Approach LOS C C C D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 14.0 39.1 14.1 32.8 14.6 38.6 12.6 34.2 Change Period (Y+Rc), s 4.2 4.9 4.2 4.9 4.2 4.9 4.2 4.9 Max Green Setting (Gmax), s 11.8 26.1 12.8 31.1 11.8 26.1 12.8 31.1 Max Q Clear Time (g_c+I1), s 8.0 5.6 8.8 17.7 6.0 15.4 4.8 25.9 Green Ext Time (p_c), s 0.1 1.8 0.1 5.6 0.1 4.8 0.1 3.4 Intersection Summary
HCM 7th Control Delay, s/veh 33.7
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 4: Holliston Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 34 191 70 0 0 0 0 54 29 13 88 0
Future Volume (veh/h) 34 191 70 0 0 0 0 54 29 13 88 0
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 40 222 59 0 63 3 15 102 0
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 495 2732 696 0 145 7 57 151 0
Arrive On Green 0.80 0.80 0.80 0.00 0.10 0.10 0.10 0.10 0.00 Sat Flow, veh/h 621 3426 872 0 1498 71 127 1563 0
Grp Volume(v), veh/h 111 102 108 0 0 66 117 0 0
Grp Sat Flow(s),veh/h/ln 1727 1600 1592 0 0 1569 1689 0 0 Q Serve(g_s), s 1.3 1.2 1.3 0.0 0.0 3.6 2.4 0.0 0.0
Cycle Q Clear(g_c), s 1.3 1.2 1.3 0.0 0.0 3.6 6.0 0.0 0.0 Prop In Lane 0.36 0.55 0.00 0.05 0.13 0.00
Lane Grp Cap(c), veh/h 1377 1276 1269 0 0 152 209 0 0
V/C Ratio(X) 0.08 0.08 0.08 0.00 0.00 0.43 0.56 0.00 0.00 Avail Cap(c_a), veh/h 1377 1276 1269 0 0 490 569 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 0.00 1.00 0.98 0.00 0.00 Uniform Delay (d), s/veh 2.0 2.0 2.0 0.0 0.0 38.3 39.4 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.1 0.1 0.0 0.0 1.9 2.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.3 0.3 0.0 0.0 1.5 2.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 2.1 2.1 2.1 0.0 0.0 40.3 41.7 0.0 0.0 LnGrp LOS A A A D D
Approach Vol, veh/h 321 66 117
Approach Delay, s/veh 2.1 40.3 41.7
Approach LOS A D D
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 76.7 13.3 13.3
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 52.4 28.1 28.1
Max Q Clear Time (g_c+I1), s 3.3 5.6 8.0
Green Ext Time (p_c), s 2.2 0.3 0.6
Intersection Summary
HCM 7th Control Delay, s/veh 16.3
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 125 16 62 21 0 35 0 588 43 86 726 0 Future Volume (veh/h) 125 16 62 21 0 35 0 588 43 86 726 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 0 1758 0 1758 1758 1660 1758 0 Adj Flow Rate, veh/h 159 0 49 22 0 37 0 619 45 91 764 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 3 3 3 3 0 3 0 3 3 3 3 0
Cap, veh/h 795 0 362 0 0 0 0 1406 102 397 1489 0
Arrive On Green 0.25 0.00 0.25 0.00 0.00 0.00 0.00 0.45 0.45 0.45 0.45 0.00 Sat Flow, veh/h 3162 0 1440 0 0 3244 229 683 3428 0
Grp Volume(v), veh/h 159 0 49 0.0 0 327 337 91 764 0
Grp Sat Flow(s),veh/h/ln 1581 0 1440 0 1670 1715 683 1670 0 Q Serve(g_s), s 1.5 0.0 1.0 0.0 5.3 5.3 4.1 6.4 0.0
Cycle Q Clear(g_c), s 1.5 0.0 1.0 0.0 5.3 5.3 9.4 6.4 0.0 Prop In Lane 1.00 1.00 0.00 0.13 1.00 0.00
Lane Grp Cap(c), veh/h 795 0 362 0 744 764 397 1489 0
V/C Ratio(X) 0.20 0.00 0.14 0.00 0.44 0.44 0.23 0.51 0.00 Avail Cap(c_a), veh/h 2110 0 961 0 1285 1320 618 2571 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 11.5 0.0 11.3 0.0 7.4 7.5 10.7 7.8 0.0 Incr Delay (d2), s/veh 0.1 0.0 0.2 0.0 0.4 0.4 0.3 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 0.3 0.0 1.4 1.4 0.5 1.6 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 11.6 0.0 11.5 0.0 7.9 7.9 11.0 8.0 0.0 LnGrp LOS B B A A B A
Approach Vol, veh/h 208 664 855
Approach Delay, s/veh 11.6 7.9 8.4
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 21.3 17.7 21.3
Change Period (Y+Rc), s 3.9 7.9 3.9
Max Green Setting (Gmax), s 30.0 26.0 30.0
Max Q Clear Time (g_c+I1), s 7.3 3.5 11.4
Green Ext Time (p_c), s 4.2 0.7 6.0
Intersection Summary
HCM 7th Control Delay, s/veh 8.5
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 104 16 76 12 10 13 328 466 61 74 502 235 Future Volume (veh/h) 104 16 76 12 10 13 328 466 61 74 502 235 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 117 18 5 13 11 2 369 524 60 83 564 207 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 247 250 210 243 205 37 538 2247 256 512 1395 510 Arrive On Green 0.14 0.14 0.14 0.14 0.14 0.14 0.11 0.74 0.74 0.59 0.59 0.59 Sat Flow, veh/h 1231 1758 1474 1220 1441 262 1581 3019 345 735 2374 869 Grp Volume(v), veh/h 117 18 5 13 0 13 369 289 295 83 396 375 Grp Sat Flow(s),veh/h/ln 1231 1758 1474 1220 0 1703 1581 1670 1694 735 1670 1573 Q Serve(g_s), s 8.2 0.8 0.3 0.8 0.0 0.6 7.7 4.8 4.9 4.7 11.5 11.6 Cycle Q Clear(g_c), s 8.8 0.8 0.3 1.6 0.0 0.6 7.7 4.8 4.9 4.7 11.5 11.6 Prop In Lane 1.00 1.00 1.00 0.15 1.00 0.20 1.00 0.55
Lane Grp Cap(c), veh/h 247 250 210 243 0 243 538 1243 1260 512 981 924 V/C Ratio(X) 0.47 0.07 0.02 0.05 0.00 0.05 0.69 0.23 0.23 0.16 0.40 0.41 Avail Cap(c_a), veh/h 429 510 427 423 0 494 570 1243 1260 512 981 924 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.80 0.80 0.80 0.91 0.91 0.91 Uniform Delay (d), s/veh 37.1 33.4 33.2 34.1 0.0 33.3 7.2 3.6 3.6 8.6 10.0 10.0 Incr Delay (d2), s/veh 2.0 0.2 0.1 0.1 0.0 0.1 2.4 0.4 0.3 0.6 1.1 1.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.4 0.1 0.3 0.0 0.3 2.3 1.3 1.4 0.8 4.2 4.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.1 33.6 33.3 34.2 0.0 33.4 9.5 3.9 3.9 9.2 11.2 11.2 LnGrp LOS D C C C C AAAABB
Approach Vol, veh/h 140 26 953 854
Approach Delay, s/veh 38.2 33.8 6.1 11.0
Approach LOS D C A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.9 18.1 14.1 57.8 18.1
Change Period (Y+Rc), s 4.9 5.3 4.2 4.9 5.3
Max Green Setting (Gmax), s 53.7 26.1 11.7 37.8 26.1
Max Q Clear Time (g_c+I1), s 6.9 10.8 9.7 13.6 3.6
Green Ext Time (p_c), s 6.1 0.6 0.2 8.4 0.1
Intersection Summary
HCM 7th Control Delay, s/veh 10.9
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 7: Hill Ave & Del Mar Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 110 433 24 11 825 246 117 454 30 145 254 192 Future Volume (veh/h) 110 433 24 11 825 246 117 454 30 145 254 192 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 0.99 0.97 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 113 446 22 11 851 81 121 468 27 149 262 75 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 164 1106 54 164 1141 497 295 740 43 345 1021 285 Arrive On Green 0.10 0.34 0.34 0.10 0.34 0.34 0.23 0.23 0.23 0.12 0.40 0.40 Sat Flow, veh/h 1581 3236 159 1581 3340 1453 916 3204 184 1581 2562 716 Grp Volume(v), veh/h 113 230 238 11 851 81 121 243 252 149 169 168 Grp Sat Flow(s),veh/h/ln 1581 1670 1725 1581 1670 1453 916 1670 1718 1581 1670 1608 Q Serve(g_s), s 6.0 9.1 9.1 0.5 19.5 3.4 10.1 11.4 11.4 5.7 5.8 6.1 Cycle Q Clear(g_c), s 6.0 9.1 9.1 0.5 19.5 3.4 10.1 11.4 11.4 5.7 5.8 6.1 Prop In Lane 1.00 0.09 1.00 1.00 1.00 0.11 1.00 0.45
Lane Grp Cap(c), veh/h 164 571 589 164 1141 497 295 386 397 345 665 641 V/C Ratio(X) 0.69 0.40 0.40 0.07 0.75 0.16 0.41 0.63 0.63 0.43 0.25 0.26 Avail Cap(c_a), veh/h 268 787 813 268 1574 685 405 586 603 430 665 641 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 37.4 21.7 21.8 35.0 25.2 19.9 29.5 30.0 30.0 20.3 17.4 17.5 Incr Delay (d2), s/veh 5.0 0.7 0.6 0.2 1.7 0.2 1.3 2.4 2.4 1.2 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 3.5 3.6 0.2 7.5 1.1 2.3 4.7 4.9 2.1 2.2 2.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 42.5 22.4 22.4 35.2 26.8 20.1 30.8 32.4 32.4 21.5 17.6 17.7 LnGrp LOS D C C D C C C C C C B B
Approach Vol, veh/h 581 943 616 486
Approach Delay, s/veh 26.3 26.3 32.1 18.8
Approach LOS C C C B
Timer - Assigned Phs 123456 8
Phs Duration (G+Y+Rc), s 13.5 34.1 14.5 24.5 13.5 34.1 39.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.7 40.8 14.7 30.4 14.7 40.8 30.4 Max Q Clear Time (g_c+I1), s 8.0 21.5 7.7 13.4 2.5 11.1 8.1 Green Ext Time (p_c), s 0.1 8.1 0.3 4.7 0.0 4.1 2.0
Intersection Summary
HCM 7th Control Delay, s/veh 26.3
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 1: Wilson Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 69 538 51 0 0 0 0 249 33 30 163 0 Future Volume (veh/h) 69 538 51 0 0 0 0 249 33 30 163 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.94 1.00 0.96 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 77 598 57 0 277 37 33 181 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 259 2005 190 0 655 534 116 555 0
Arrive On Green 0.49 0.49 0.49 0.00 0.37 0.37 0.37 0.37 0.00 Sat Flow, veh/h 526 4081 386 0 1758 1432 152 1489 0
Grp Volume(v), veh/h 253 233 246 0 277 37 214 0 0
Grp Sat Flow(s),veh/h/ln 1732 1600 1662 0 1758 1432 1641 0 0 Q Serve(g_s), s 6.1 6.1 6.2 0.0 8.2 1.2 0.0 0.0 0.0
Cycle Q Clear(g_c), s 6.1 6.1 6.2 0.0 8.2 1.2 6.1 0.0 0.0 Prop In Lane 0.30 0.23 0.00 1.00 0.15 0.00
Lane Grp Cap(c), veh/h 851 786 817 0 655 534 671 0 0
V/C Ratio(X) 0.30 0.30 0.30 0.00 0.42 0.07 0.32 0.00 0.00 Avail Cap(c_a), veh/h 851 786 817 0 655 534 671 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.6 10.6 10.6 0.0 16.3 14.1 15.7 0.0 0.0 Incr Delay (d2), s/veh 0.9 1.0 0.9 0.0 2.0 0.3 1.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 2.2 2.3 0.0 3.5 0.4 2.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 11.5 11.6 11.6 0.0 18.3 14.4 16.9 0.0 0.0 LnGrp LOS B B B B B B
Approach Vol, veh/h 732 314 214
Approach Delay, s/veh 11.5 17.9 16.9
Approach LOS B B B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 39.3 30.7 30.7
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 34.4 26.1 26.1
Max Q Clear Time (g_c+I1), s 8.2 8.1 10.2
Green Ext Time (p_c), s 0.9 0.3 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 14.0
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 2: Holliston Ave & Colorado Blvd Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 17 573 32 60 570 3 27 27 85 18 10 9 Future Volume (veh/h) 17 573 32 60 570 3 27 27 85 18 10 9 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.97 0.90 0.97 0.91 0.99 0.98 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 0.90 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1758 1758 1758 1758 1758 1758 Adj Flow Rate, veh/h 18 591 28 62 588 2 28 28 68 19 10 6 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 195 949 45 184 1003 3 204 204 429 450 227 126 Arrive On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.58 0.58 0.58 0.58 0.58 0.58 Sat Flow, veh/h 713 3227 153 695 3413 12 256 350 735 653 389 216 Grp Volume(v), veh/h 18 305 314 62 288 302 124 0 0 35 0 0 Grp Sat Flow(s),veh/h/ln 713 1670 1709 695 1670 1755 1340 0 0 1258 0 0 Q Serve(g_s), s 1.8 12.6 12.7 6.8 11.8 11.8 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 13.5 12.6 12.7 19.5 11.8 11.8 3.2 0.0 0.0 0.8 0.0 0.0 Prop In Lane 1.00 0.09 1.00 0.01 0.23 0.55 0.54 0.17
Lane Grp Cap(c), veh/h 195 491 503 184 491 516 837 0 0 803 0 0 V/C Ratio(X) 0.09 0.62 0.62 0.34 0.59 0.59 0.15 0.00 0.00 0.04 0.00 0.00 Avail Cap(c_a), veh/h 200 503 515 189 503 529 837 0 0 803 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.92 0.92 0.92 0.91 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 29.9 24.4 24.4 32.8 24.1 24.1 7.6 0.0 0.0 7.1 0.0 0.0 Incr Delay (d2), s/veh 0.2 2.3 2.3 1.0 1.6 1.5 0.3 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 5.1 5.2 1.2 4.7 4.9 1.0 0.0 0.0 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.1 26.7 26.7 33.8 25.6 25.6 7.9 0.0 0.0 7.2 0.0 0.0 LnGrp LOS C C C C C C A A
Approach Vol, veh/h 637 652 124 35
Approach Delay, s/veh 26.8 26.4 7.9 7.2
Approach LOS C C A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 51.6 28.4 51.6 28.4
Change Period (Y+Rc), s 4.9 4.9 4.9 4.9
Max Green Setting (Gmax), s 46.1 24.1 46.1 24.1
Max Q Clear Time (g_c+I1), s 5.2 15.5 2.8 21.5
Green Ext Time (p_c), s 0.8 2.6 0.2 1.1
Intersection Summary
HCM 7th Control Delay, s/veh 24.5
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 3: Hill Ave & Colorado Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 151 462 65 119 424 200 60 653 282 123 348 120 Future Volume (veh/h) 151 462 65 119 424 200 60 653 282 123 348 120 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.95 0.99 0.95 0.99 0.96 0.99 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 156 476 19 123 437 111 62 673 136 127 359 89 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 432 1199 510 425 1159 491 338 886 378 273 739 180 Arrive On Green 0.11 0.36 0.36 0.10 0.35 0.35 0.08 0.27 0.27 0.10 0.28 0.28 Sat Flow, veh/h 1581 3340 1421 1581 3340 1415 1581 3340 1427 1581 2636 643 Grp Volume(v), veh/h 156 476 19 123 437 111 62 673 136 127 225 223 Grp Sat Flow(s),veh/h/ln 1581 1670 1421 1581 1670 1415 1581 1670 1427 1581 1670 1609 Q Serve(g_s), s 6.0 10.7 0.9 4.7 9.8 5.6 2.7 18.5 7.7 5.6 11.2 11.6 Cycle Q Clear(g_c), s 6.0 10.7 0.9 4.7 9.8 5.6 2.7 18.5 7.7 5.6 11.2 11.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.40
Lane Grp Cap(c), veh/h 432 1199 510 425 1159 491 338 886 378 273 468 451 V/C Ratio(X) 0.36 0.40 0.04 0.29 0.38 0.23 0.18 0.76 0.36 0.47 0.48 0.49 Avail Cap(c_a), veh/h 446 1199 510 458 1159 491 410 1039 444 322 519 500 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.61 0.61 0.61 1.00 1.00 1.00 0.77 0.77 0.77 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.0 24.0 20.8 17.3 24.5 23.1 22.7 33.8 29.8 24.3 29.9 30.1 Incr Delay (d2), s/veh 0.3 0.6 0.1 0.4 0.9 1.1 0.2 3.0 0.9 1.2 1.6 1.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 4.2 0.3 1.7 4.0 2.0 1.0 7.8 2.7 2.1 4.7 4.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.4 24.6 20.9 17.7 25.5 24.2 22.9 36.8 30.8 25.5 31.6 31.9 LnGrp LOS B C C B C C C D C C C C
Approach Vol, veh/h 651 671 871 575
Approach Delay, s/veh 22.7 23.8 34.9 30.4
Approach LOS C C C C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.9 40.8 13.9 31.4 15.1 39.6 12.4 32.9 Change Period (Y+Rc), s 4.2 4.9 4.2 4.9 4.2 4.9 4.2 4.9 Max Green Setting (Gmax), s 11.8 26.1 12.8 31.1 11.8 26.1 12.8 31.1 Max Q Clear Time (g_c+I1), s 6.7 12.7 7.6 20.5 8.0 11.8 4.7 13.6 Green Ext Time (p_c), s 0.1 4.4 0.1 5.8 0.1 4.8 0.1 4.5 Intersection Summary
HCM 7th Control Delay, s/veh 28.4
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 4: Holliston Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 59 526 40 0 0 0 0 54 28 18 65 0
Future Volume (veh/h) 59 526 40 0 0 0 0 54 28 18 65 0
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 0.97 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 61 542 35 0 56 5 19 67 0
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 385 3418 220 0 137 12 70 133 0
Arrive On Green 0.80 0.80 0.80 0.00 0.10 0.10 0.10 0.10 0.00 Sat Flow, veh/h 482 4281 275 0 1426 127 218 1389 0
Grp Volume(v), veh/h 219 202 217 0 0 61 86 0 0
Grp Sat Flow(s),veh/h/ln 1734 1600 1705 0 0 1553 1607 0 0 Q Serve(g_s), s 2.6 2.6 2.6 0.0 0.0 3.3 1.3 0.0 0.0
Cycle Q Clear(g_c), s 2.6 2.6 2.6 0.0 0.0 3.3 4.6 0.0 0.0 Prop In Lane 0.28 0.16 0.00 0.08 0.22 0.00
Lane Grp Cap(c), veh/h 1384 1277 1361 0 0 149 203 0 0
V/C Ratio(X) 0.16 0.16 0.16 0.00 0.00 0.41 0.42 0.00 0.00 Avail Cap(c_a), veh/h 1384 1277 1361 0 0 312 372 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.96 0.96 0.96 0.00 0.00 1.00 0.93 0.00 0.00 Uniform Delay (d), s/veh 2.1 2.1 2.1 0.0 0.0 38.3 38.7 0.0 0.0 Incr Delay (d2), s/veh 0.2 0.3 0.2 0.0 0.0 1.8 1.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.6 0.7 0.0 0.0 1.3 1.9 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 2.3 2.3 2.3 0.0 0.0 40.1 40.0 0.0 0.0 LnGrp LOS A A A D D
Approach Vol, veh/h 638 61 86
Approach Delay, s/veh 2.3 40.1 40.0
Approach LOS A D D
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 76.8 13.2 13.2
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 62.4 18.1 18.1
Max Q Clear Time (g_c+I1), s 4.6 5.3 6.6
Green Ext Time (p_c), s 4.7 0.2 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 9.4
HCM 7th LOS A
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 280 6 208 66 0 55 0 685 28 18 538 0 Future Volume (veh/h) 280 6 208 66 0 55 0 685 28 18 538 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.96 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 0 1758 0 1758 1758 1660 1758 0 Adj Flow Rate, veh/h 377 0 153 72 0 60 0 745 30 20 585 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 3 3 0 3 0 3 3 3 3 0
Cap, veh/h 950 0 434 0 0 0 0 1244 50 316 1272 0
Arrive On Green 0.30 0.00 0.30 0.00 0.00 0.00 0.00 0.38 0.38 0.38 0.38 0.00 Sat Flow, veh/h 3162 0 1445 0 0 3355 131 616 3428 0
Grp Volume(v), veh/h 377 0 153 0.0 0 381 394 20 585 0
Grp Sat Flow(s),veh/h/ln 1581 0 1445 0 1670 1728 616 1670 0 Q Serve(g_s), s 3.5 0.0 3.1 0.0 6.8 6.8 1.0 4.9 0.0
Cycle Q Clear(g_c), s 3.5 0.0 3.1 0.0 6.8 6.8 7.8 4.9 0.0 Prop In Lane 1.00 1.00 0.00 0.08 1.00 0.00
Lane Grp Cap(c), veh/h 950 0 434 0 636 658 316 1272 0
V/C Ratio(X) 0.40 0.00 0.35 0.00 0.60 0.60 0.06 0.46 0.00 Avail Cap(c_a), veh/h 2220 0 1015 0 1353 1400 581 2706 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 10.3 0.0 10.1 0.0 9.2 9.2 12.3 8.6 0.0 Incr Delay (d2), s/veh 0.3 0.0 0.5 0.0 0.9 0.9 0.1 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 0.8 0.0 1.9 1.9 0.1 1.3 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 10.6 0.0 10.6 0.0 10.1 10.1 12.4 8.9 0.0 LnGrp LOS B B B B B A
Approach Vol, veh/h 530 775 605
Approach Delay, s/veh 10.6 10.1 9.0
Approach LOS B B A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 18.0 19.0 18.0
Change Period (Y+Rc), s 3.9 7.9 3.9
Max Green Setting (Gmax), s 30.0 26.0 30.0
Max Q Clear Time (g_c+I1), s 8.8 5.5 9.8
Green Ext Time (p_c), s 5.0 1.9 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 9.9
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 110 8 169 83 34 123 115 426 14 15 588 160 Future Volume (veh/h) 110 8 169 83 34 123 115 426 14 15 588 160 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 118 9 22 89 37 16 124 458 13 16 632 149 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 229 267 226 260 177 76 518 2437 69 565 1590 374 Arrive On Green 0.15 0.15 0.15 0.15 0.15 0.15 0.10 0.73 0.73 0.59 0.59 0.59 Sat Flow, veh/h 1199 1758 1490 1224 1164 503 1581 3317 94 819 2683 631 Grp Volume(v), veh/h 118 9 22 89 0 53 124 230 241 16 393 388 Grp Sat Flow(s),veh/h/ln 1199 1758 1490 1224 0 1667 1581 1670 1741 819 1670 1644 Q Serve(g_s), s 8.6 0.4 1.1 6.0 0.0 2.5 2.2 3.8 3.8 0.7 11.3 11.3 Cycle Q Clear(g_c), s 11.1 0.4 1.1 6.4 0.0 2.5 2.2 3.8 3.8 0.7 11.3 11.3 Prop In Lane 1.00 1.00 1.00 0.30 1.00 0.05 1.00 0.38
Lane Grp Cap(c), veh/h 229 267 226 260 0 253 518 1227 1279 565 990 974 V/C Ratio(X) 0.52 0.03 0.10 0.34 0.00 0.21 0.24 0.19 0.19 0.03 0.40 0.40 Avail Cap(c_a), veh/h 394 510 432 429 0 484 572 1227 1279 565 990 974 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.88 0.88 0.88 0.89 0.89 0.89 Uniform Delay (d), s/veh 38.3 32.5 32.9 35.3 0.0 33.4 5.3 3.7 3.7 7.6 9.8 9.8 Incr Delay (d2), s/veh 2.6 0.1 0.3 0.8 0.0 0.4 0.2 0.3 0.3 0.1 1.1 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 0.2 0.4 1.8 0.0 1.0 0.6 1.1 1.1 0.1 4.0 4.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.8 32.6 33.1 36.0 0.0 33.8 5.5 4.0 4.0 7.7 10.8 10.9 LnGrp LOS D C C D C AAAABB
Approach Vol, veh/h 149 142 595 797
Approach Delay, s/veh 39.2 35.2 4.3 10.8
Approach LOS D D A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.0 19.0 12.8 58.2 19.0
Change Period (Y+Rc), s 4.9 5.3 4.2 4.9 5.3
Max Green Setting (Gmax), s 53.7 26.1 11.7 37.8 26.1
Max Q Clear Time (g_c+I1), s 5.8 13.1 4.2 13.3 8.4
Green Ext Time (p_c), s 4.6 0.6 0.1 7.7 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 13.1
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Baseline Conditions (2027) 7: Hill Ave & Del Mar Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 103 878 28 44 500 199 39 240 35 417 342 132 Future Volume (veh/h) 103 878 28 44 500 199 39 240 35 417 342 132 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 0.98 0.95 0.98 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 112 954 28 48 543 62 42 261 26 453 372 104 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 152 1183 35 152 1194 515 234 599 59 440 1031 284 Arrive On Green 0.10 0.36 0.36 0.10 0.36 0.36 0.20 0.20 0.20 0.16 0.40 0.40 Sat Flow, veh/h 1581 3309 97 1581 3340 1440 798 3054 301 1581 2566 707 Grp Volume(v), veh/h 112 481 501 48 543 62 42 141 146 453 240 236 Grp Sat Flow(s),veh/h/ln 1581 1670 1736 1581 1670 1440 798 1670 1684 1581 1670 1603 Q Serve(g_s), s 6.4 24.3 24.3 2.6 11.7 2.7 4.2 6.9 7.1 14.7 9.4 9.6 Cycle Q Clear(g_c), s 6.4 24.3 24.3 2.6 11.7 2.7 4.2 6.9 7.1 14.7 9.4 9.6 Prop In Lane 1.00 0.06 1.00 1.00 1.00 0.18 1.00 0.44
Lane Grp Cap(c), veh/h 152 597 621 152 1194 515 234 328 331 440 671 644 V/C Ratio(X) 0.74 0.81 0.81 0.32 0.45 0.12 0.18 0.43 0.44 1.03 0.36 0.37 Avail Cap(c_a), veh/h 249 729 758 249 1458 629 337 543 548 440 671 644 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.1 27.1 27.1 39.4 23.0 20.2 31.9 33.0 33.0 29.6 19.5 19.6 Incr Delay (d2), s/veh 6.7 6.2 6.0 1.2 0.4 0.1 0.5 1.3 1.3 50.6 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 10.2 10.6 1.1 4.5 0.9 0.8 2.9 3.0 9.9 3.6 3.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 47.8 33.3 33.1 40.5 23.4 20.3 32.4 34.3 34.4 80.3 19.9 20.0 LnGrp LOS D C C D C C C C C F B B
Approach Vol, veh/h 1094 653 329 929
Approach Delay, s/veh 34.7 24.4 34.1 49.3
Approach LOS C C C D
Timer - Assigned Phs 123456 8
Phs Duration (G+Y+Rc), s 13.5 37.9 19.2 22.8 13.5 37.9 42.0 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.7 40.8 14.7 30.4 14.7 40.8 30.4 Max Q Clear Time (g_c+I1), s 8.4 13.7 16.7 9.1 4.6 26.3 11.6 Green Ext Time (p_c), s 0.1 5.7 0.0 2.6 0.0 7.1 2.8
Intersection Summary
HCM 7th Control Delay, s/veh 36.9
HCM 7th LOS D
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 1: Wilson Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 19 215 49 0 0 0 0 189 53 46 246 0 Future Volume (veh/h) 19 215 49 0 0 0 0 189 53 46 246 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.95 1.00 0.99 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 20 226 52 0 199 56 48 259 0
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 160 1789 389 0 681 573 121 577 0
Arrive On Green 0.48 0.48 0.48 0.00 0.39 0.39 0.39 0.39 0.00 Sat Flow, veh/h 336 3749 815 0 1758 1480 160 1491 0
Grp Volume(v), veh/h 104 95 99 0 199 56 307 0 0
Grp Sat Flow(s),veh/h/ln 1741 1600 1559 0 1758 1480 1651 0 0 Q Serve(g_s), s 2.3 2.3 2.5 0.0 5.5 1.7 0.0 0.0 0.0
Cycle Q Clear(g_c), s 2.3 2.3 2.5 0.0 5.5 1.7 9.1 0.0 0.0 Prop In Lane 0.19 0.52 0.00 1.00 0.16 0.00
Lane Grp Cap(c), veh/h 831 763 744 0 681 573 699 0 0
V/C Ratio(X) 0.12 0.12 0.13 0.00 0.29 0.10 0.44 0.00 0.00 Avail Cap(c_a), veh/h 831 763 744 0 681 573 699 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.2 10.2 10.2 0.0 14.8 13.7 15.9 0.0 0.0 Incr Delay (d2), s/veh 0.3 0.3 0.4 0.0 1.1 0.3 2.0 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.8 0.9 0.0 2.3 0.6 3.8 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 10.5 10.5 10.6 0.0 15.9 14.0 17.9 0.0 0.0 LnGrp LOS B B B B B B
Approach Vol, veh/h 298 255 307
Approach Delay, s/veh 10.5 15.5 17.9
Approach LOS B B B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 38.3 31.7 31.7
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 33.4 27.1 27.1
Max Q Clear Time (g_c+I1), s 4.5 11.1 7.5
Green Ext Time (p_c), s 0.4 0.4 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 14.6
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 2: Holliston Ave & Colorado Blvd Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 245 27 78 614 3 14 10 50 4 14 3 Future Volume (veh/h) 6 245 27 78 614 3 14 10 50 4 14 3 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.94 0.98 0.96 0.99 0.98 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 0.90 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1758 1758 1758 1758 1758 1758 Adj Flow Rate, veh/h 6 255 17 81 640 2 15 10 31 4 15 2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 148 809 54 272 873 3 252 173 456 196 683 87
Arrive On Green 0.26 0.26 0.26 0.26 0.25 0.26 0.62 0.62 0.62 0.62 0.62 0.62 Sat Flow, veh/h 692 3165 209 961 3415 11 313 278 733 229 1099 140 Grp Volume(v), veh/h 6 134 138 81 313 329 56 0 0 21 0 0 Grp Sat Flow(s),veh/h/ln 692 1670 1705 961 1670 1755 1324 0 0 1468 0 0 Q Serve(g_s), s 0.6 5.2 5.3 6.0 13.7 13.8 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 14.4 5.2 5.3 11.2 13.7 13.8 1.2 0.0 0.0 0.4 0.0 0.0 Prop In Lane 1.00 0.12 1.00 0.01 0.27 0.55 0.19 0.10
Lane Grp Cap(c), veh/h 148 427 436 272 427 449 881 0 0 966 0 0 V/C Ratio(X) 0.04 0.31 0.32 0.30 0.73 0.73 0.06 0.00 0.00 0.02 0.00 0.00 Avail Cap(c_a), veh/h 180 503 514 316 503 529 881 0 0 966 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.86 0.86 0.86 0.92 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 33.9 24.1 24.1 28.7 27.4 27.4 6.0 0.0 0.0 5.8 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.4 0.4 0.5 3.9 3.7 0.1 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 2.0 2.1 1.4 5.7 6.0 0.4 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.0 24.5 24.5 29.2 31.3 31.1 6.1 0.0 0.0 5.8 0.0 0.0 LnGrp LOS C C C C C C A A
Approach Vol, veh/h 278 723 56 21
Approach Delay, s/veh 24.7 31.0 6.1 5.8
Approach LOS C C A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 54.6 25.4 54.6 25.4
Change Period (Y+Rc), s 4.9 4.9 4.9 4.9
Max Green Setting (Gmax), s 46.1 24.1 46.1 24.1
Max Q Clear Time (g_c+I1), s 3.2 16.4 2.4 15.8
Green Ext Time (p_c), s 0.3 0.9 0.1 2.8
Intersection Summary
HCM 7th Control Delay, s/veh 27.6
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 3: Hill Ave & Colorado Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 99 162 24 151 529 161 65 566 114 146 662 163 Future Volume (veh/h) 99 162 24 151 529 161 65 566 114 146 662 163 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.96 0.98 0.96 1.00 0.98 0.99 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 105 172 7 161 563 89 69 602 38 155 704 153 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 372 1126 482 544 1109 474 235 946 414 316 804 175 Arrive On Green 0.10 0.34 0.34 0.10 0.33 0.33 0.09 0.28 0.28 0.10 0.30 0.30 Sat Flow, veh/h 1581 3340 1428 1581 3340 1428 1581 3340 1461 1581 2711 589 Grp Volume(v), veh/h 105 172 7 161 563 89 69 602 38 155 433 424 Grp Sat Flow(s),veh/h/ln 1581 1670 1428 1581 1670 1428 1581 1670 1461 1581 1670 1630 Q Serve(g_s), s 4.0 3.6 0.3 6.5 13.5 4.4 2.9 15.8 1.9 6.7 24.7 24.7 Cycle Q Clear(g_c), s 4.0 3.6 0.3 6.5 13.5 4.4 2.9 15.8 1.9 6.7 24.7 24.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.36
Lane Grp Cap(c), veh/h 372 1126 482 544 1109 474 235 946 414 316 495 483 V/C Ratio(X) 0.28 0.15 0.01 0.30 0.51 0.19 0.29 0.64 0.09 0.49 0.88 0.88 Avail Cap(c_a), veh/h 394 1126 482 574 1109 474 303 1039 454 362 519 507 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.95 0.95 0.95 1.00 1.00 1.00 0.94 0.94 0.94 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.1 23.2 22.1 18.1 26.8 23.8 23.9 31.3 26.4 22.8 33.4 33.4 Incr Delay (d2), s/veh 0.4 0.3 0.1 0.3 1.7 0.9 0.6 1.7 0.2 1.2 16.2 16.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 1.4 0.1 2.4 5.6 1.6 1.1 6.5 0.7 2.5 12.0 11.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 18.5 23.4 22.1 18.4 28.5 24.7 24.6 33.0 26.6 24.0 49.7 50.1 LnGrp LOS B C C B C C C C C C D D
Approach Vol, veh/h 284 813 709 1012
Approach Delay, s/veh 21.6 26.1 31.9 45.9
Approach LOS C C C D
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 14.1 38.6 14.1 33.2 14.6 38.1 12.7 34.6 Change Period (Y+Rc), s 4.2 4.9 4.2 4.9 4.2 4.9 4.2 4.9 Max Green Setting (Gmax), s 11.8 26.1 12.8 31.1 11.8 26.1 12.8 31.1 Max Q Clear Time (g_c+I1), s 8.5 5.6 8.7 17.8 6.0 15.5 4.9 26.7 Green Ext Time (p_c), s 0.1 1.8 0.1 5.7 0.1 4.8 0.1 3.0 Intersection Summary
HCM 7th Control Delay, s/veh 34.2
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 4: Holliston Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 34 191 90 0 0 0 0 54 29 13 106 0 Future Volume (veh/h) 34 191 90 0 0 0 0 54 29 13 106 0
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 40 222 82 0 63 3 15 123 0
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 453 2505 872 0 163 8 56 175 0
Arrive On Green 0.79 0.79 0.79 0.00 0.11 0.11 0.11 0.11 0.00 Sat Flow, veh/h 577 3188 1110 0 1498 71 105 1610 0
Grp Volume(v), veh/h 120 110 114 0 0 66 138 0 0
Grp Sat Flow(s),veh/h/ln 1729 1600 1546 0 0 1569 1715 0 0 Q Serve(g_s), s 1.4 1.4 1.5 0.0 0.0 3.5 2.8 0.0 0.0
Cycle Q Clear(g_c), s 1.4 1.4 1.5 0.0 0.0 3.5 7.0 0.0 0.0 Prop In Lane 0.33 0.72 0.00 0.05 0.11 0.00
Lane Grp Cap(c), veh/h 1359 1257 1215 0 0 171 231 0 0
V/C Ratio(X) 0.09 0.09 0.09 0.00 0.00 0.39 0.60 0.00 0.00 Avail Cap(c_a), veh/h 1359 1257 1215 0 0 490 573 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 0.00 1.00 0.97 0.00 0.00 Uniform Delay (d), s/veh 2.2 2.2 2.2 0.0 0.0 37.3 38.8 0.0 0.0 Incr Delay (d2), s/veh 0.1 0.1 0.2 0.0 0.0 1.4 2.4 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.4 0.4 0.0 0.0 1.4 3.1 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 2.3 2.4 2.4 0.0 0.0 38.7 41.2 0.0 0.0 LnGrp LOS A A A D D
Approach Vol, veh/h 344 66 138
Approach Delay, s/veh 2.4 38.7 41.2
Approach LOS A D D
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 75.6 14.4 14.4
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 52.4 28.1 28.1
Max Q Clear Time (g_c+I1), s 3.5 5.5 9.0
Green Ext Time (p_c), s 2.4 0.3 0.7
Intersection Summary
HCM 7th Control Delay, s/veh 16.5
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 133 16 71 21 0 35 0 588 43 86 747 0 Future Volume (veh/h) 133 16 71 21 0 35 0 588 43 86 747 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 0 1758 0 1758 1758 1660 1758 0 Adj Flow Rate, veh/h 170 0 56 22 0 37 0 619 45 91 786 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 3 3 3 3 0 3 0 3 3 3 3 0
Cap, veh/h 803 0 365 0 0 0 0 1410 102 396 1493 0
Arrive On Green 0.25 0.00 0.25 0.00 0.00 0.00 0.00 0.45 0.45 0.45 0.45 0.00 Sat Flow, veh/h 3162 0 1440 0 0 3244 229 683 3428 0
Grp Volume(v), veh/h 170 0 56 0.0 0 327 337 91 786 0
Grp Sat Flow(s),veh/h/ln 1581 0 1440 0 1670 1715 683 1670 0 Q Serve(g_s), s 1.7 0.0 1.2 0.0 5.3 5.3 4.2 6.7 0.0
Cycle Q Clear(g_c), s 1.7 0.0 1.2 0.0 5.3 5.3 9.5 6.7 0.0 Prop In Lane 1.00 1.00 0.00 0.13 1.00 0.00
Lane Grp Cap(c), veh/h 803 0 365 0 746 766 396 1493 0
V/C Ratio(X) 0.21 0.00 0.15 0.00 0.44 0.44 0.23 0.53 0.00 Avail Cap(c_a), veh/h 2086 0 949 0 1271 1305 610 2542 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 11.6 0.0 11.4 0.0 7.5 7.5 10.8 7.9 0.0 Incr Delay (d2), s/veh 0.1 0.0 0.2 0.0 0.4 0.4 0.3 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 0.3 0.0 1.4 1.4 0.5 1.7 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 11.7 0.0 11.6 0.0 7.9 7.9 11.1 8.2 0.0 LnGrp LOS B B A A B A
Approach Vol, veh/h 226 664 877
Approach Delay, s/veh 11.7 7.9 8.5
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 21.5 17.9 21.5
Change Period (Y+Rc), s 3.9 7.9 3.9
Max Green Setting (Gmax), s 30.0 26.0 30.0
Max Q Clear Time (g_c+I1), s 7.3 3.7 11.5
Green Ext Time (p_c), s 4.2 0.7 6.1
Intersection Summary
HCM 7th Control Delay, s/veh 8.7
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 104 16 76 12 10 13 340 466 61 74 508 259 Future Volume (veh/h) 104 16 76 12 10 13 340 466 61 74 508 259 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.98 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 117 18 5 13 11 2 382 524 60 83 571 234 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 247 250 210 243 205 37 527 2247 256 509 1338 547 Arrive On Green 0.14 0.14 0.14 0.14 0.14 0.14 0.11 0.74 0.74 0.58 0.58 0.58 Sat Flow, veh/h 1231 1758 1474 1220 1441 262 1581 3019 345 735 2291 937 Grp Volume(v), veh/h 117 18 5 13 0 13 382 289 295 83 416 389 Grp Sat Flow(s),veh/h/ln 1231 1758 1474 1220 0 1703 1581 1670 1694 735 1670 1558 Q Serve(g_s), s 8.2 0.8 0.3 0.8 0.0 0.6 8.0 4.8 4.9 4.8 12.4 12.5 Cycle Q Clear(g_c), s 8.8 0.8 0.3 1.6 0.0 0.6 8.0 4.8 4.9 4.8 12.4 12.5 Prop In Lane 1.00 1.00 1.00 0.15 1.00 0.20 1.00 0.60
Lane Grp Cap(c), veh/h 247 250 210 243 0 243 527 1243 1260 509 975 910 V/C Ratio(X) 0.47 0.07 0.02 0.05 0.00 0.05 0.73 0.23 0.23 0.16 0.43 0.43 Avail Cap(c_a), veh/h 429 510 427 423 0 494 553 1243 1260 509 975 910 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.79 0.79 0.79 0.91 0.91 0.91 Uniform Delay (d), s/veh 37.1 33.4 33.2 34.1 0.0 33.3 7.9 3.6 3.6 8.8 10.4 10.4 Incr Delay (d2), s/veh 2.0 0.2 0.1 0.1 0.0 0.1 3.3 0.3 0.3 0.6 1.2 1.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.4 0.1 0.3 0.0 0.3 2.5 1.3 1.4 0.8 4.5 4.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.1 33.6 33.3 34.2 0.0 33.4 11.2 3.9 3.9 9.4 11.6 11.7 LnGrp LOS D C C C C BAAABB
Approach Vol, veh/h 140 26 966 888
Approach Delay, s/veh 38.2 33.8 6.8 11.5
Approach LOS D C A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.9 18.1 14.4 57.5 18.1
Change Period (Y+Rc), s 4.9 5.3 4.2 4.9 5.3
Max Green Setting (Gmax), s 53.7 26.1 11.7 37.8 26.1
Max Q Clear Time (g_c+I1), s 6.9 10.8 10.0 14.5 3.6
Green Ext Time (p_c), s 6.1 0.6 0.2 8.7 0.1
Intersection Summary
HCM 7th Control Delay, s/veh 11.4
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 7: Hill Ave & Del Mar Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 110 433 24 11 829 246 121 466 30 146 257 194 Future Volume (veh/h) 110 433 24 11 829 246 121 466 30 146 257 194 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 0.99 0.97 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 113 446 22 11 855 80 125 480 27 151 265 79 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 163 1107 54 163 1142 497 295 748 42 341 1014 295 Arrive On Green 0.10 0.34 0.34 0.10 0.34 0.34 0.23 0.23 0.23 0.11 0.40 0.40 Sat Flow, veh/h 1581 3236 159 1581 3340 1453 911 3209 180 1581 2536 738 Grp Volume(v), veh/h 113 230 238 11 855 80 125 249 258 151 172 172 Grp Sat Flow(s),veh/h/ln 1581 1670 1725 1581 1670 1453 911 1670 1719 1581 1670 1604 Q Serve(g_s), s 6.0 9.1 9.2 0.5 19.7 3.3 10.6 11.7 11.8 5.8 6.0 6.3 Cycle Q Clear(g_c), s 6.0 9.1 9.2 0.5 19.7 3.3 10.6 11.7 11.8 5.8 6.0 6.3 Prop In Lane 1.00 0.09 1.00 1.00 1.00 0.10 1.00 0.46
Lane Grp Cap(c), veh/h 163 571 590 163 1142 497 295 390 401 341 667 641 V/C Ratio(X) 0.69 0.40 0.40 0.07 0.75 0.16 0.42 0.64 0.64 0.44 0.26 0.27 Avail Cap(c_a), veh/h 267 782 808 267 1564 680 400 583 600 427 667 641 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 37.7 21.9 21.9 35.3 25.3 20.0 29.7 30.1 30.1 20.4 17.5 17.6 Incr Delay (d2), s/veh 5.2 0.7 0.6 0.2 1.7 0.2 1.4 2.5 2.5 1.3 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 3.5 3.7 0.2 7.6 1.1 2.4 4.9 5.0 2.2 2.3 2.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 42.9 22.5 22.5 35.4 27.1 20.2 31.1 32.6 32.6 21.7 17.7 17.8 LnGrp LOS D C C D C C C C C C B B
Approach Vol, veh/h 581 946 632 495
Approach Delay, s/veh 26.5 26.6 32.3 19.0
Approach LOS C C C B
Timer - Assigned Phs 123456 8
Phs Duration (G+Y+Rc), s 13.5 34.3 14.5 24.8 13.5 34.3 39.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.7 40.8 14.7 30.4 14.7 40.8 30.4 Max Q Clear Time (g_c+I1), s 8.0 21.7 7.8 13.8 2.5 11.2 8.3 Green Ext Time (p_c), s 0.1 8.1 0.3 4.8 0.0 4.1 2.0
Intersection Summary
HCM 7th Control Delay, s/veh 26.5
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 1: Wilson Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 69 540 51 0 0 0 0 249 34 31 163 0 Future Volume (veh/h) 69 540 51 0 0 0 0 249 34 31 163 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.94 1.00 0.96 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 77 600 57 0 277 38 34 181 0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 258 2007 189 0 655 534 118 551 0
Arrive On Green 0.49 0.49 0.49 0.00 0.37 0.37 0.37 0.37 0.00 Sat Flow, veh/h 525 4084 385 0 1758 1432 157 1479 0
Grp Volume(v), veh/h 254 234 246 0 277 38 215 0 0
Grp Sat Flow(s),veh/h/ln 1732 1600 1662 0 1758 1432 1636 0 0 Q Serve(g_s), s 6.1 6.1 6.2 0.0 8.2 1.2 0.0 0.0 0.0
Cycle Q Clear(g_c), s 6.1 6.1 6.2 0.0 8.2 1.2 6.1 0.0 0.0 Prop In Lane 0.30 0.23 0.00 1.00 0.16 0.00
Lane Grp Cap(c), veh/h 851 786 817 0 655 534 670 0 0
V/C Ratio(X) 0.30 0.30 0.30 0.00 0.42 0.07 0.32 0.00 0.00 Avail Cap(c_a), veh/h 851 786 817 0 655 534 670 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.6 10.6 10.6 0.0 16.3 14.1 15.7 0.0 0.0 Incr Delay (d2), s/veh 0.9 1.0 0.9 0.0 2.0 0.3 1.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 2.2 2.3 0.0 3.5 0.4 2.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 11.5 11.6 11.6 0.0 18.3 14.4 17.0 0.0 0.0 LnGrp LOS B B B B B B
Approach Vol, veh/h 734 315 215
Approach Delay, s/veh 11.5 17.9 17.0
Approach LOS B B B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 39.3 30.7 30.7
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 34.4 26.1 26.1
Max Q Clear Time (g_c+I1), s 8.2 8.1 10.2
Green Ext Time (p_c), s 0.9 0.3 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 14.0
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 2: Holliston Ave & Colorado Blvd Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 17 573 33 61 576 7 27 27 85 18 11 9 Future Volume (veh/h) 17 573 33 61 576 7 27 27 85 18 11 9 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.97 0.90 0.97 0.92 0.99 0.98 0.99 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 0.90 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1758 1758 1758 1758 1758 1758 Adj Flow Rate, veh/h 18 591 29 63 594 6 28 28 68 19 11 6 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 192 948 46 184 997 10 204 204 428 440 243 123 Arrive On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.58 0.58 0.58 0.58 0.58 0.58 Sat Flow, veh/h 707 3220 158 695 3384 34 256 350 735 637 417 211 Grp Volume(v), veh/h 18 306 314 63 293 307 124 0 0 36 0 0 Grp Sat Flow(s),veh/h/ln 707 1670 1708 695 1670 1748 1340 0 0 1265 0 0 Q Serve(g_s), s 1.8 12.7 12.7 6.9 12.0 12.0 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 13.8 12.7 12.7 19.6 12.0 12.0 3.2 0.0 0.0 0.8 0.0 0.0 Prop In Lane 1.00 0.09 1.00 0.02 0.23 0.55 0.53 0.17
Lane Grp Cap(c), veh/h 192 492 503 184 492 515 836 0 0 806 0 0 V/C Ratio(X) 0.09 0.62 0.62 0.34 0.60 0.60 0.15 0.00 0.00 0.04 0.00 0.00 Avail Cap(c_a), veh/h 197 503 514 189 503 527 836 0 0 806 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.92 0.92 0.92 0.92 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 30.1 24.4 24.4 32.9 24.1 24.2 7.6 0.0 0.0 7.1 0.0 0.0 Incr Delay (d2), s/veh 0.2 2.3 2.3 1.0 1.7 1.6 0.3 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 5.1 5.2 1.2 4.8 5.0 1.0 0.0 0.0 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.3 26.7 26.7 33.9 25.8 25.8 8.0 0.0 0.0 7.2 0.0 0.0 LnGrp LOS C C C C C C A A
Approach Vol, veh/h 638 663 124 36
Approach Delay, s/veh 26.8 26.6 8.0 7.2
Approach LOS C C A A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 51.5 28.5 51.5 28.5
Change Period (Y+Rc), s 4.9 4.9 4.9 4.9
Max Green Setting (Gmax), s 46.1 24.1 46.1 24.1
Max Q Clear Time (g_c+I1), s 5.2 15.8 2.8 21.6
Green Ext Time (p_c), s 0.8 2.5 0.2 1.0
Intersection Summary
HCM 7th Control Delay, s/veh 24.6
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 3: Hill Ave & Colorado Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 151 462 65 120 424 200 70 672 291 123 350 121 Future Volume (veh/h) 151 462 65 120 424 200 70 672 291 123 350 121 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 0.99 0.95 0.99 0.95 0.99 0.96 0.99 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 156 476 19 124 437 111 72 693 145 127 361 91 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 428 1187 505 421 1148 486 342 898 384 270 734 182 Arrive On Green 0.11 0.36 0.36 0.10 0.34 0.34 0.09 0.27 0.27 0.10 0.28 0.28 Sat Flow, veh/h 1581 3340 1420 1581 3340 1414 1581 3340 1427 1581 2626 652 Grp Volume(v), veh/h 156 476 19 124 437 111 72 693 145 127 228 224 Grp Sat Flow(s),veh/h/ln 1581 1670 1420 1581 1670 1414 1581 1670 1427 1581 1670 1607 Q Serve(g_s), s 6.0 10.7 0.9 4.8 9.9 5.6 3.1 19.1 8.3 5.5 11.4 11.7 Cycle Q Clear(g_c), s 6.0 10.7 0.9 4.8 9.9 5.6 3.1 19.1 8.3 5.5 11.4 11.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.41
Lane Grp Cap(c), veh/h 428 1187 505 421 1148 486 342 898 384 270 467 449 V/C Ratio(X) 0.36 0.40 0.04 0.29 0.38 0.23 0.21 0.77 0.38 0.47 0.49 0.50 Avail Cap(c_a), veh/h 443 1187 505 455 1148 486 408 1039 444 319 519 500 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.61 0.61 0.61 1.00 1.00 1.00 0.75 0.75 0.75 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.3 24.2 21.1 17.5 24.8 23.4 22.4 33.7 29.8 24.2 30.1 30.2 Incr Delay (d2), s/veh 0.3 0.6 0.1 0.4 1.0 1.1 0.2 3.2 1.0 1.3 1.7 1.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 4.3 0.3 1.7 4.0 2.0 1.2 8.0 2.9 2.1 4.7 4.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.6 24.9 21.1 17.9 25.7 24.5 22.6 36.9 30.7 25.5 31.7 32.0 LnGrp LOS B C C B C C C D C C C C
Approach Vol, veh/h 651 672 910 579
Approach Delay, s/veh 23.0 24.1 34.8 30.5
Approach LOS C C C C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.9 40.4 13.9 31.8 15.1 39.3 12.8 32.8 Change Period (Y+Rc), s 4.2 4.9 4.2 4.9 4.2 4.9 4.2 4.9 Max Green Setting (Gmax), s 11.8 26.1 12.8 31.1 11.8 26.1 12.8 31.1 Max Q Clear Time (g_c+I1), s 6.8 12.7 7.5 21.1 8.0 11.9 5.1 13.7 Green Ext Time (p_c), s 0.1 4.4 0.1 5.7 0.1 4.8 0.1 4.5 Intersection Summary
HCM 7th Control Delay, s/veh 28.6
HCM 7th LOS C
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 4: Holliston Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 59 526 44 0 0 0 0 54 28 18 68 0
Future Volume (veh/h) 59 526 44 0 0 0 0 54 28 18 68 0
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.96 0.97 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1758 1758 1758 0 1758 1758 1758 1758 0 Adj Flow Rate, veh/h 61 542 39 0 56 5 19 70 0
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 3 3 3 0 3 3 3 3 0
Cap, veh/h 382 3392 243 0 137 12 69 135 0
Arrive On Green 0.80 0.80 0.80 0.00 0.10 0.10 0.10 0.10 0.00 Sat Flow, veh/h 479 4250 304 0 1426 127 212 1401 0
Grp Volume(v), veh/h 221 203 218 0 0 61 89 0 0
Grp Sat Flow(s),veh/h/ln 1734 1600 1699 0 0 1554 1613 0 0 Q Serve(g_s), s 2.7 2.6 2.7 0.0 0.0 3.3 1.4 0.0 0.0
Cycle Q Clear(g_c), s 2.7 2.6 2.7 0.0 0.0 3.3 4.7 0.0 0.0 Prop In Lane 0.28 0.18 0.00 0.08 0.21 0.00
Lane Grp Cap(c), veh/h 1384 1277 1356 0 0 150 204 0 0
V/C Ratio(X) 0.16 0.16 0.16 0.00 0.00 0.41 0.44 0.00 0.00 Avail Cap(c_a), veh/h 1384 1277 1356 0 0 312 373 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.96 0.96 0.96 0.00 0.00 1.00 0.93 0.00 0.00 Uniform Delay (d), s/veh 2.1 2.1 2.1 0.0 0.0 38.2 38.8 0.0 0.0 Incr Delay (d2), s/veh 0.2 0.3 0.2 0.0 0.0 1.8 1.4 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.6 0.7 0.0 0.0 1.3 2.0 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 2.3 2.4 2.3 0.0 0.0 40.0 40.2 0.0 0.0 LnGrp LOS A A A D D
Approach Vol, veh/h 642 61 89
Approach Delay, s/veh 2.3 40.0 40.2
Approach LOS A D D
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 76.7 13.3 13.3
Change Period (Y+Rc), s 4.9 4.6 4.6
Max Green Setting (Gmax), s 62.4 18.1 18.1
Max Q Clear Time (g_c+I1), s 4.7 5.3 6.7
Green Ext Time (p_c), s 4.7 0.2 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 9.5
HCM 7th LOS A
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 318 6 247 66 0 55 0 685 28 18 541 0 Future Volume (veh/h) 318 6 247 66 0 55 0 685 28 18 541 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.96 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 0 1758 0 1758 1758 1660 1758 0 Adj Flow Rate, veh/h 432 0 181 72 0 60 0 745 30 20 588 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 3 3 0 3 0 3 3 3 3 0
Cap, veh/h 951 0 435 0 0 0 0 1244 50 316 1272 0
Arrive On Green 0.30 0.00 0.30 0.00 0.00 0.00 0.00 0.38 0.38 0.38 0.38 0.00 Sat Flow, veh/h 3162 0 1445 0 0 3355 131 616 3428 0
Grp Volume(v), veh/h 432 0 181 0.0 0 381 394 20 588 0
Grp Sat Flow(s),veh/h/ln 1581 0 1445 0 1670 1728 616 1670 0 Q Serve(g_s), s 4.1 0.0 3.7 0.0 6.8 6.8 1.0 4.9 0.0
Cycle Q Clear(g_c), s 4.1 0.0 3.7 0.0 6.8 6.8 7.8 4.9 0.0 Prop In Lane 1.00 1.00 0.00 0.08 1.00 0.00
Lane Grp Cap(c), veh/h 951 0 435 0 636 658 316 1272 0
V/C Ratio(X) 0.45 0.00 0.42 0.00 0.60 0.60 0.06 0.46 0.00 Avail Cap(c_a), veh/h 2219 0 1014 0 1352 1399 580 2704 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 10.5 0.0 10.4 0.0 9.2 9.2 12.3 8.6 0.0 Incr Delay (d2), s/veh 0.3 0.0 0.6 0.0 0.9 0.9 0.1 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 0.0 1.0 0.0 1.9 1.9 0.1 1.3 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 10.8 0.0 11.0 0.0 10.1 10.1 12.4 8.9 0.0 LnGrp LOS B B B B B A
Approach Vol, veh/h 613 775 608
Approach Delay, s/veh 10.9 10.1 9.0
Approach LOS B B A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 18.0 19.1 18.0
Change Period (Y+Rc), s 3.9 7.9 3.9
Max Green Setting (Gmax), s 30.0 26.0 30.0
Max Q Clear Time (g_c+I1), s 8.8 6.1 9.8
Green Ext Time (p_c), s 5.0 2.2 4.2
Intersection Summary
HCM 7th Control Delay, s/veh 10.0
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement.
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 110 8 169 83 34 123 117 426 14 15 615 175 Future Volume (veh/h) 110 8 169 83 34 123 117 426 14 15 615 175 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 118 9 22 89 37 16 126 458 13 16 661 163 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 229 267 226 260 177 76 501 2437 69 565 1573 388 Arrive On Green 0.15 0.15 0.15 0.15 0.15 0.15 0.10 0.73 0.73 0.59 0.59 0.59 Sat Flow, veh/h 1199 1758 1490 1224 1164 503 1581 3317 94 819 2656 654 Grp Volume(v), veh/h 118 9 22 89 0 53 126 230 241 16 415 409 Grp Sat Flow(s),veh/h/ln 1199 1758 1490 1224 0 1667 1581 1670 1741 819 1670 1640 Q Serve(g_s), s 8.6 0.4 1.1 6.0 0.0 2.5 2.3 3.8 3.8 0.7 12.1 12.2 Cycle Q Clear(g_c), s 11.1 0.4 1.1 6.4 0.0 2.5 2.3 3.8 3.8 0.7 12.1 12.2 Prop In Lane 1.00 1.00 1.00 0.30 1.00 0.05 1.00 0.40
Lane Grp Cap(c), veh/h 229 267 226 260 0 253 501 1227 1279 565 989 972 V/C Ratio(X) 0.52 0.03 0.10 0.34 0.00 0.21 0.25 0.19 0.19 0.03 0.42 0.42 Avail Cap(c_a), veh/h 394 510 432 429 0 484 555 1227 1279 565 989 972 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.88 0.88 0.88 0.89 0.89 0.89 Uniform Delay (d), s/veh 38.3 32.5 32.9 35.3 0.0 33.4 5.5 3.7 3.7 7.6 10.0 10.0 Incr Delay (d2), s/veh 2.6 0.1 0.3 0.8 0.0 0.4 0.2 0.3 0.3 0.1 1.2 1.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 0.2 0.4 1.8 0.0 1.0 0.6 1.1 1.1 0.1 4.4 4.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.8 32.6 33.1 36.0 0.0 33.8 5.7 4.0 4.0 7.7 11.1 11.1 LnGrp LOS D C C D C AAAABB
Approach Vol, veh/h 149 142 597 840
Approach Delay, s/veh 39.2 35.2 4.3 11.1
Approach LOS D D A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.0 19.0 12.8 58.2 19.0
Change Period (Y+Rc), s 4.9 5.3 4.2 4.9 5.3
Max Green Setting (Gmax), s 53.7 26.1 11.7 37.8 26.1
Max Q Clear Time (g_c+I1), s 5.8 13.1 4.3 14.2 8.4
Green Ext Time (p_c), s 4.6 0.6 0.1 8.1 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 13.2
HCM 7th LOS B
HCM 7th Signalized Intersection Summary Future Plus Project Conditions (2027) 7: Hill Ave & Del Mar Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 103 878 28 44 501 199 40 242 35 421 357 140 Future Volume (veh/h) 103 878 28 44 501 199 40 242 35 421 357 140 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 0.98 0.95 0.98 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1660 1758 1758 1660 1758 1758 1660 1758 1758 1660 1758 1758 Adj Flow Rate, veh/h 112 954 28 48 545 62 43 263 26 458 388 112 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 3 3 3 3 3 3 3 3 3 3 3
Cap, veh/h 152 1183 35 152 1194 515 231 601 59 440 1023 291 Arrive On Green 0.10 0.36 0.36 0.10 0.36 0.36 0.20 0.20 0.20 0.16 0.40 0.40 Sat Flow, veh/h 1581 3309 97 1581 3340 1440 781 3056 299 1581 2545 724 Grp Volume(v), veh/h 112 481 501 48 545 62 43 142 147 458 253 247 Grp Sat Flow(s),veh/h/ln 1581 1670 1736 1581 1670 1440 781 1670 1685 1581 1670 1599 Q Serve(g_s), s 6.4 24.3 24.3 2.6 11.7 2.7 4.4 7.0 7.2 14.7 10.0 10.2 Cycle Q Clear(g_c), s 6.4 24.3 24.3 2.6 11.7 2.7 4.4 7.0 7.2 14.7 10.0 10.2 Prop In Lane 1.00 0.06 1.00 1.00 1.00 0.18 1.00 0.45
Lane Grp Cap(c), veh/h 152 597 621 152 1194 515 231 328 331 440 671 643 V/C Ratio(X) 0.74 0.81 0.81 0.32 0.46 0.12 0.19 0.43 0.44 1.04 0.38 0.38 Avail Cap(c_a), veh/h 249 729 758 249 1457 628 331 543 548 440 671 643 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.1 27.1 27.1 39.4 23.1 20.2 31.9 33.0 33.1 29.6 19.7 19.8 Incr Delay (d2), s/veh 6.7 6.2 6.0 1.2 0.4 0.1 0.5 1.3 1.3 54.3 0.3 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.7 10.2 10.6 1.1 4.5 0.9 0.9 2.9 3.0 10.3 3.8 3.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 47.8 33.3 33.1 40.6 23.5 20.3 32.5 34.3 34.4 83.9 20.1 20.2 LnGrp LOS D C C D C C C C C F C C
Approach Vol, veh/h 1094 655 332 958
Approach Delay, s/veh 34.7 24.4 34.1 50.6
Approach LOS C C C D
Timer - Assigned Phs 123456 8
Phs Duration (G+Y+Rc), s 13.5 37.9 19.2 22.9 13.5 37.9 42.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 14.7 40.8 14.7 30.4 14.7 40.8 30.4 Max Q Clear Time (g_c+I1), s 8.4 13.7 16.7 9.2 4.6 26.3 12.2 Green Ext Time (p_c), s 0.1 5.7 0.0 2.7 0.0 7.1 2.9
Intersection Summary
HCM 7th Control Delay, s/veh 37.4
HCM 7th LOS D
Appendix C.
Queuing
Calculation
Sheets
Queues Future Baseline Conditions (2027)
1: Wilson Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Lane Group EBT NBT NBR SBT
Lane Group Flow (vph) 286 199 52 303
v/c Ratio 0.13 0.29 0.09 0.48
Control Delay (s/veh) 8.5 16.4 4.9 19.3
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 8.5 16.4 4.9 19.3
Queue Length 50th (ft) 19 58 0 95
Queue Length 95th (ft) 32 104 19 163
Internal Link Dist (ft) 283 463 342
Turn Bay Length (ft) 75
Base Capacity (vph) 2197 676 595 631
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.13 0.29 0.09 0.48
Intersection Summary
Queues Future Baseline Conditions (2027)
2: Holliston Ave & Colorado Blvd Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Lane Group EBL EBT WBL WBT NBT SBT
Lane Group Flow (vph) 6 277 73 641 77 17
v/c Ratio 0.06 0.32 0.30 0.74 0.08 0.02
Control Delay (s/veh) 21.8 23.1 26.0 32.1 3.7 6.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 21.8 23.1 26.0 32.1 3.7 6.5
Queue Length 50th (ft) 2 54 29 150 5 3
Queue Length 95th (ft) 11 84 62 201 22 11
Internal Link Dist (ft) 633 381 399 649
Turn Bay Length (ft) 130 130
Base Capacity (vph) 118 991 278 1000 948 1013
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.05 0.28 0.26 0.64 0.08 0.02
Intersection Summary
Queues Future Baseline Conditions (2027)
3: Hill Ave & Colorado Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 105 172 26 151 563 171 67 598 119 155 856 v/c Ratio 0.30 0.17 0.05 0.31 0.51 0.31 0.28 0.62 0.24 0.50 0.79 Control Delay (s/veh) 19.7 28.0 0.2 19.5 31.4 13.1 17.3 33.3 7.0 21.4 35.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 19.7 28.0 0.2 19.5 31.4 13.1 17.3 33.3 7.0 21.4 35.1 Queue Length 50th (ft) 40 44 0 59 166 29 22 163 3 54 246 Queue Length 95th (ft) 75 73 0 103 226 86 46 224 43 94 323 Internal Link Dist (ft) 381 304 397 1152
Turn Bay Length (ft) 150 150 140 50 100 100 120
Base Capacity (vph) 358 1005 504 489 1101 550 287 1046 529 333 1088 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.29 0.17 0.05 0.31 0.51 0.31 0.23 0.57 0.22 0.47 0.79 Intersection Summary
Queues Future Baseline Conditions (2027)
4: Holliston Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 4
Lane Group EBT NBT SBT
Lane Group Flow (vph) 343 97 117
v/c Ratio 0.10 0.43 0.53
Control Delay (s/veh) 2.5 30.0 44.2
Queue Delay 0.0 0.0 0.0
Total Delay (s/veh) 2.5 30.0 44.2
Queue Length 50th (ft) 10 35 63
Queue Length 95th (ft) 22 71 103
Internal Link Dist (ft) 1485 580 399
Turn Bay Length (ft)
Base Capacity (vph) 3455 487 519
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.10 0.20 0.23
Intersection Summary
Queues Future Baseline Conditions (2027)
5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 5
Lane Group EBL EBT EBR WBL WBR NBT SBL SBT
Lane Group Flow (vph) 78 78 58 22 37 664 91 764
v/c Ratio 0.21 0.21 0.15 0.07 0.09 0.40 0.31 0.45
Control Delay (s/veh) 21.8 20.5 7.2 25.2 0.5 12.8 17.4 13.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 21.8 20.5 7.2 25.2 0.5 12.8 17.4 13.5 Queue Length 50th (ft) 23 21 0 6 0 85 22 104
Queue Length 95th (ft) 65 64 25 28 0 155 67 185
Internal Link Dist (ft) 380 644 397
Turn Bay Length (ft) 140
Base Capacity (vph) 870 886 821 352 425 2190 384 2214
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.09 0.09 0.07 0.06 0.09 0.30 0.24 0.35 Intersection Summary
Queues Future Baseline Conditions (2027)
6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 117 18 85 13 26 369 593 83 828
v/c Ratio 0.55 0.06 0.26 0.06 0.09 0.72 0.26 0.25 0.55
Control Delay (s/veh) 42.3 27.8 8.5 27.8 17.4 18.7 5.4 18.8 17.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.2 0.6 0.0 0.0
Total Delay (s/veh) 42.3 27.8 8.5 27.8 17.4 19.0 5.9 18.8 17.1 Queue Length 50th (ft) 62 9 0 6 5 62 47 28 148
Queue Length 95th (ft) 101 23 33 19 23 #225 100 66 219
Internal Link Dist (ft) 826 139 213 644
Turn Bay Length (ft) 175 50 50 110
Base Capacity (vph) 352 506 484 355 468 509 2322 329 1518 Starvation Cap Reductn 0 0 0 0 0 9 1268 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.33 0.04 0.18 0.04 0.06 0.74 0.56 0.25 0.55 Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Queues Future Baseline Conditions (2027)
7: Hill Ave & Del Mar Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Lane Group EBL EBT WBL WBT WBR NBL NBT SBL SBT
Lane Group Flow (vph) 113 471 11 851 254 121 499 149 460 v/c Ratio 0.59 0.39 0.08 0.76 0.39 0.66 0.66 0.48 0.34
Control Delay (s/veh) 58.7 24.6 51.2 35.8 5.3 56.4 40.3 26.7 12.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.2
Total Delay (s/veh) 58.7 24.6 51.2 35.8 5.3 56.4 40.3 27.4 12.8 Queue Length 50th (ft) 71 113 7 255 0 73 157 65 59
Queue Length 95th (ft) 145 176 27 377 56 152 232 121 106 Internal Link Dist (ft) 848 1556 421 213
Turn Bay Length (ft) 110 130 80 100
Base Capacity (vph) 238 1452 238 1400 755 249 1035 339 1664 Starvation Cap Reductn 0 0 0 0 0 0 0 51 576
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.47 0.32 0.05 0.61 0.34 0.49 0.48 0.52 0.42 Intersection Summary
Queues Future Baseline Conditions (2027)
1: Wilson Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Lane Group EBT NBT NBR SBT
Lane Group Flow (vph) 732 277 37 214
v/c Ratio 0.32 0.43 0.07 0.36
Control Delay (s/veh) 10.8 18.9 5.8 18.0
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 10.8 18.9 5.8 18.0
Queue Length 50th (ft) 62 87 0 65
Queue Length 95th (ft) 86 148 17 117
Internal Link Dist (ft) 283 463 342
Turn Bay Length (ft) 75
Base Capacity (vph) 2294 651 551 601
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.32 0.43 0.07 0.36
Intersection Summary
Queues Future Baseline Conditions (2027)
2: Holliston Ave & Colorado Blvd Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Lane Group EBL EBT WBL WBT NBT SBT
Lane Group Flow (vph) 18 624 62 591 144 38
v/c Ratio 0.16 0.73 0.60 0.69 0.15 0.04
Control Delay (s/veh) 24.7 31.7 50.6 30.6 5.4 6.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 24.7 31.7 50.6 30.6 5.4 6.1
Queue Length 50th (ft) 7 145 27 136 18 5
Queue Length 95th (ft) 24 194 #78 183 44 18
Internal Link Dist (ft) 633 381 399 649
Turn Bay Length (ft) 130 130
Base Capacity (vph) 135 991 120 999 945 916
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.13 0.63 0.52 0.59 0.15 0.04
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Queues Future Baseline Conditions (2027)
3: Hill Ave & Colorado Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 156 476 67 123 437 206 62 673 291 127 483 v/c Ratio 0.41 0.47 0.13 0.34 0.44 0.41 0.17 0.69 0.51 0.45 0.45 Control Delay (s/veh) 20.6 30.8 2.0 19.6 30.7 14.2 16.0 35.1 11.3 20.9 25.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 20.6 30.8 2.0 19.6 30.7 14.2 16.0 35.1 11.3 20.9 25.1 Queue Length 50th (ft) 57 126 0 44 117 35 22 197 36 47 117 Queue Length 95th (ft) 106 190 10 86 174 104 43 256 109 78 157 Internal Link Dist (ft) 381 304 397 1152
Turn Bay Length (ft) 150 150 140 50 100 100 120
Base Capacity (vph) 384 1017 507 375 995 506 411 1042 594 312 1115 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.41 0.47 0.13 0.33 0.44 0.41 0.15 0.65 0.49 0.41 0.43 Intersection Summary
Queues Future Baseline Conditions (2027)
4: Holliston Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 4
Lane Group EBT NBT SBT
Lane Group Flow (vph) 644 85 86
v/c Ratio 0.17 0.41 0.44
Control Delay (s/veh) 2.8 31.4 42.5
Queue Delay 0.0 0.0 0.0
Total Delay (s/veh) 2.8 31.4 42.5
Queue Length 50th (ft) 24 32 47
Queue Length 95th (ft) 52 69 84
Internal Link Dist (ft) 1485 580 399
Turn Bay Length (ft)
Base Capacity (vph) 3788 320 319
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.17 0.27 0.27
Intersection Summary
Queues Future Baseline Conditions (2027)
5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 5
Lane Group EBL EBT EBR WBL WBR NBT SBL SBT
Lane Group Flow (vph) 185 183 169 72 60 775 20 585
v/c Ratio 0.48 0.46 0.36 0.27 0.17 0.66 0.15 0.50
Control Delay (s/veh) 25.8 22.2 6.4 30.3 2.0 20.2 18.7 17.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 25.8 22.2 6.4 30.3 2.0 20.2 18.7 17.7 Queue Length 50th (ft) 62 52 0 24 0 119 5 84
Queue Length 95th (ft) 137 127 45 73 6 220 23 160
Internal Link Dist (ft) 380 644 397
Turn Bay Length (ft) 140
Base Capacity (vph) 722 716 736 292 368 1847 215 1858
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.26 0.26 0.23 0.25 0.16 0.42 0.09 0.31 Intersection Summary
Queues Future Baseline Conditions (2027)
6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 118 9 182 89 169 124 473 16 804
v/c Ratio 0.69 0.03 0.43 0.39 0.43 0.29 0.20 0.04 0.45
Control Delay (s/veh) 53.2 26.3 7.6 35.1 11.9 7.0 5.6 12.5 13.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
Total Delay (s/veh) 53.2 26.3 7.6 35.1 11.9 7.0 6.1 12.5 13.4 Queue Length 50th (ft) 63 4 0 45 18 19 41 4 124
Queue Length 95th (ft) 110 15 48 80 64 50 82 17 216
Internal Link Dist (ft) 826 139 213 644
Turn Bay Length (ft) 175 50 50 110
Base Capacity (vph) 268 506 559 359 541 463 2317 437 1792 Starvation Cap Reductn 0 0 0 0 0 0 1328 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.44 0.02 0.33 0.25 0.31 0.27 0.48 0.04 0.45 Intersection Summary
Queues Future Baseline Conditions (2027)
7: Hill Ave & Del Mar Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Lane Group EBL EBT WBL WBT WBR NBL NBT SBL SBT
Lane Group Flow (vph) 112 984 48 543 216 42 299 453 515 v/c Ratio 0.56 0.80 0.29 0.47 0.34 0.33 0.53 1.20 0.42
Control Delay (s/veh) 52.2 32.4 47.5 26.0 5.0 43.4 38.2 140.8 20.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.2
Total Delay (s/veh) 52.2 32.4 47.5 26.0 5.0 43.4 38.2 141.2 21.0 Queue Length 50th (ft) 63 257 27 126 0 22 83 ~254 104
Queue Length 95th (ft) 135 410 70 210 51 59 133 #601 164 Internal Link Dist (ft) 848 1556 421 213
Turn Bay Length (ft) 110 130 80 100
Base Capacity (vph) 248 1455 248 1463 757 246 1071 377 1709 Starvation Cap Reductn 0 0 0 0 0 0 0 14 485
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.45 0.68 0.19 0.37 0.29 0.17 0.28 1.25 0.42 Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Queues Future Plus Project Conditions (2027)
1: Wilson Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Lane Group EBT NBT NBR SBT
Lane Group Flow (vph) 298 199 56 307
v/c Ratio 0.14 0.29 0.09 0.49
Control Delay (s/veh) 8.6 16.4 4.8 19.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 8.6 16.4 4.8 19.5
Queue Length 50th (ft) 20 58 0 97
Queue Length 95th (ft) 34 104 20 166
Internal Link Dist (ft) 283 463 342
Turn Bay Length (ft) 75
Base Capacity (vph) 2201 676 597 627
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.14 0.29 0.09 0.49
Intersection Summary
Queues Future Plus Project Conditions (2027)
2: Holliston Ave & Colorado Blvd Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Lane Group EBL EBT WBL WBT NBT SBT
Lane Group Flow (vph) 6 283 81 643 77 22
v/c Ratio 0.06 0.33 0.34 0.74 0.08 0.02
Control Delay (s/veh) 21.8 22.9 27.0 32.2 3.7 6.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 21.8 22.9 27.0 32.2 3.7 6.6
Queue Length 50th (ft) 2 55 32 151 5 3
Queue Length 95th (ft) 11 84 68 202 22 13
Internal Link Dist (ft) 633 381 399 649
Turn Bay Length (ft) 130 130
Base Capacity (vph) 117 990 275 999 948 1027
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.05 0.29 0.29 0.64 0.08 0.02
Intersection Summary
Queues Future Plus Project Conditions (2027)
3: Hill Ave & Colorado Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 105 172 26 161 563 171 69 602 121 155 877 v/c Ratio 0.30 0.17 0.05 0.34 0.52 0.31 0.29 0.62 0.24 0.50 0.80 Control Delay (s/veh) 19.8 28.2 0.2 19.9 31.7 13.2 17.5 33.0 7.2 21.2 35.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 19.8 28.2 0.2 19.9 31.7 13.2 17.5 33.0 7.2 21.2 35.6 Queue Length 50th (ft) 40 45 0 64 166 29 23 164 4 54 255 Queue Length 95th (ft) 75 73 0 109 226 86 47 226 44 94 334 Internal Link Dist (ft) 381 304 397 1152
Turn Bay Length (ft) 150 150 140 50 100 100 120
Base Capacity (vph) 355 992 499 484 1091 546 283 1055 533 334 1096 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.30 0.17 0.05 0.33 0.52 0.31 0.24 0.57 0.23 0.46 0.80 Intersection Summary
Queues Future Plus Project Conditions (2027)
4: Holliston Ave & Green St Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 4
Lane Group EBT NBT SBT
Lane Group Flow (vph) 367 97 138
v/c Ratio 0.11 0.41 0.58
Control Delay (s/veh) 2.5 28.9 45.4
Queue Delay 0.0 0.0 0.0
Total Delay (s/veh) 2.5 28.9 45.4
Queue Length 50th (ft) 11 34 75
Queue Length 95th (ft) 23 71 118
Internal Link Dist (ft) 1485 580 399
Turn Bay Length (ft)
Base Capacity (vph) 3390 487 523
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.11 0.20 0.26
Intersection Summary
Queues Future Plus Project Conditions (2027)
5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 5
Lane Group EBL EBT EBR WBL WBR NBT SBL SBT
Lane Group Flow (vph) 83 82 67 22 37 664 91 786
v/c Ratio 0.23 0.22 0.17 0.07 0.09 0.39 0.31 0.46
Control Delay (s/veh) 22.2 20.7 7.9 25.5 0.5 12.7 17.3 13.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 22.2 20.7 7.9 25.5 0.5 12.7 17.3 13.6 Queue Length 50th (ft) 25 23 0 6 0 85 22 108
Queue Length 95th (ft) 68 67 29 28 0 155 67 192
Internal Link Dist (ft) 380 644 397
Turn Bay Length (ft) 140
Base Capacity (vph) 865 878 817 350 423 2176 381 2199
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.10 0.09 0.08 0.06 0.09 0.31 0.24 0.36 Intersection Summary
Queues Future Plus Project Conditions (2027)
6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: AM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 117 18 85 13 26 382 593 83 862
v/c Ratio 0.55 0.06 0.26 0.06 0.09 0.73 0.26 0.27 0.60
Control Delay (s/veh) 42.3 27.8 8.5 27.8 17.4 21.5 5.4 19.8 18.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 1.0 0.6 0.0 0.0
Total Delay (s/veh) 42.3 27.8 8.5 27.8 17.4 22.5 5.9 19.8 18.6 Queue Length 50th (ft) 62 9 0 6 5 82 47 30 165
Queue Length 95th (ft) 101 23 33 19 23 #297 100 66 227
Internal Link Dist (ft) 826 139 213 644
Turn Bay Length (ft) 175 50 50 110
Base Capacity (vph) 352 506 484 355 468 521 2322 308 1436 Starvation Cap Reductn 0 0 0 0 0 31 1268 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.33 0.04 0.18 0.04 0.06 0.78 0.56 0.27 0.60 Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Queues Future Plus Project Conditions (2027)
7: Hill Ave & Del Mar Blvd Timing Plan: AM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Lane Group EBL EBT WBL WBT WBR NBL NBT SBL SBT
Lane Group Flow (vph) 113 471 11 855 254 125 511 151 465 v/c Ratio 0.59 0.39 0.08 0.77 0.39 0.67 0.66 0.49 0.34
Control Delay (s/veh) 59.6 24.8 51.5 36.4 5.3 56.7 40.3 26.9 12.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.3
Total Delay (s/veh) 59.6 24.8 51.5 36.4 5.3 56.7 40.3 27.7 13.0 Queue Length 50th (ft) 73 117 7 265 0 77 164 67 61
Queue Length 95th (ft) 145 176 27 380 56 156 238 122 108 Internal Link Dist (ft) 848 1556 421 213
Turn Bay Length (ft) 110 130 80 100
Base Capacity (vph) 235 1434 235 1381 748 245 1021 337 1644 Starvation Cap Reductn 0 0 0 0 0 0 0 51 598
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.48 0.33 0.05 0.62 0.34 0.51 0.50 0.53 0.44 Intersection Summary
Queues Future Plus Project Conditions (2027)
1: Wilson Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 1
Lane Group EBT NBT NBR SBT
Lane Group Flow (vph) 734 277 38 215
v/c Ratio 0.32 0.43 0.07 0.36
Control Delay (s/veh) 10.8 18.9 5.7 18.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 10.8 18.9 5.7 18.1
Queue Length 50th (ft) 63 87 0 65
Queue Length 95th (ft) 86 148 17 117
Internal Link Dist (ft) 283 463 342
Turn Bay Length (ft) 75
Base Capacity (vph) 2294 651 552 599
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.32 0.43 0.07 0.36
Intersection Summary
Queues Future Plus Project Conditions (2027)
2: Holliston Ave & Colorado Blvd Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 2
Lane Group EBL EBT WBL WBT NBT SBT
Lane Group Flow (vph) 18 625 63 601 144 39
v/c Ratio 0.16 0.73 0.61 0.70 0.15 0.04
Control Delay (s/veh) 24.9 31.8 51.5 31.0 5.4 6.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 24.9 31.8 51.5 31.0 5.4 6.1
Queue Length 50th (ft) 7 145 27 140 18 5
Queue Length 95th (ft) 24 194 #80 187 44 18
Internal Link Dist (ft) 633 381 399 649
Turn Bay Length (ft) 130 130
Base Capacity (vph) 131 991 120 998 945 919
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.14 0.63 0.53 0.60 0.15 0.04
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Queues Future Plus Project Conditions (2027)
3: Hill Ave & Colorado Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT
Lane Group Flow (vph) 156 476 67 124 437 206 72 693 300 127 486 v/c Ratio 0.41 0.47 0.13 0.35 0.44 0.41 0.20 0.70 0.52 0.46 0.45 Control Delay (s/veh) 20.7 31.0 2.0 19.8 30.9 14.3 16.2 35.4 12.0 21.0 25.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 20.7 31.0 2.0 19.8 30.9 14.3 16.2 35.4 12.0 21.0 25.2 Queue Length 50th (ft) 58 128 0 45 118 35 25 203 40 46 117 Queue Length 95th (ft) 106 190 10 87 174 104 48 266 118 78 160 Internal Link Dist (ft) 381 304 397 1152
Turn Bay Length (ft) 150 150 140 50 100 100 120
Base Capacity (vph) 382 1011 504 374 989 504 410 1042 594 307 1112 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.41 0.47 0.13 0.33 0.44 0.41 0.18 0.67 0.51 0.41 0.44 Intersection Summary
Queues Future Plus Project Conditions (2027)
4: Holliston Ave & Green St Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 4
Lane Group EBT NBT SBT
Lane Group Flow (vph) 648 85 89
v/c Ratio 0.17 0.41 0.45
Control Delay (s/veh) 2.9 31.2 42.7
Queue Delay 0.0 0.0 0.0
Total Delay (s/veh) 2.9 31.2 42.7
Queue Length 50th (ft) 24 32 48
Queue Length 95th (ft) 52 69 86
Internal Link Dist (ft) 1485 580 399
Turn Bay Length (ft)
Base Capacity (vph) 3782 320 320
Starvation Cap Reductn 0 0 0
Spillback Cap Reductn 0 0 0
Storage Cap Reductn 0 0 0
Reduced v/c Ratio 0.17 0.27 0.28
Intersection Summary
Queues Future Plus Project Conditions (2027)
5: Hill Ave & Green St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 5
Lane Group EBL EBT EBR WBL WBR NBT SBL SBT
Lane Group Flow (vph) 215 210 196 72 60 775 20 588
v/c Ratio 0.52 0.50 0.38 0.27 0.17 0.67 0.15 0.51
Control Delay (s/veh) 26.2 22.1 6.0 31.8 1.9 21.4 19.9 18.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 26.2 22.1 6.0 31.8 1.9 21.4 19.9 18.7 Queue Length 50th (ft) 74 62 0 25 0 128 5 91
Queue Length 95th (ft) 158 143 47 75 6 228 24 166
Internal Link Dist (ft) 380 644 397
Turn Bay Length (ft) 140
Base Capacity (vph) 701 694 733 283 361 1791 204 1802
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.31 0.30 0.27 0.25 0.17 0.43 0.10 0.33 Intersection Summary
Queues Future Plus Project Conditions (2027)
6: Hill Ave & Cordova St/Pasadena City College Parking Lot Timing Plan: PM Peak Hour 1364 E Green Street Synchro 12 Report
Fehr & Peers Page 6
Lane Group EBL EBT EBR WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 118 9 182 89 169 126 473 16 849
v/c Ratio 0.69 0.03 0.43 0.39 0.43 0.30 0.20 0.04 0.47
Control Delay (s/veh) 53.2 26.3 7.6 35.1 11.9 7.2 5.6 12.5 13.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.0 0.0
Total Delay (s/veh) 53.2 26.3 7.6 35.1 11.9 7.2 6.1 12.5 13.7 Queue Length 50th (ft) 63 4 0 45 18 19 41 4 133
Queue Length 95th (ft) 110 15 48 80 64 50 82 17 232
Internal Link Dist (ft) 826 139 213 644
Turn Bay Length (ft) 175 50 50 110
Base Capacity (vph) 268 506 559 359 541 447 2317 437 1791 Starvation Cap Reductn 0 0 0 0 0 0 1328 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.44 0.02 0.33 0.25 0.31 0.28 0.48 0.04 0.47 Intersection Summary
Queues Future Plus Project Conditions (2027)
7: Hill Ave & Del Mar Blvd Timing Plan: PM Peak Hour
1364 E Green Street Synchro 12 Report
Fehr & Peers Page 7
Lane Group EBL EBT WBL WBT WBR NBL NBT SBL SBT
Lane Group Flow (vph) 112 984 48 545 216 43 301 458 540 v/c Ratio 0.56 0.80 0.29 0.47 0.34 0.35 0.54 1.22 0.44
Control Delay (s/veh) 52.2 32.5 47.6 26.1 5.0 44.1 38.3 146.6 21.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.2
Total Delay (s/veh) 52.2 32.5 47.6 26.1 5.0 44.1 38.3 147.0 21.3 Queue Length 50th (ft) 63 258 27 127 0 23 83 ~261 111
Queue Length 95th (ft) 135 410 70 211 51 60 134 #609 173 Internal Link Dist (ft) 848 1556 421 213
Turn Bay Length (ft) 110 130 80 100
Base Capacity (vph) 248 1454 248 1462 757 240 1070 376 1709 Starvation Cap Reductn 0 0 0 0 0 0 0 14 481
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.45 0.68 0.19 0.37 0.29 0.18 0.28 1.27 0.44 Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Created: 2026-01-29 15:32:55 [EST]
(Supp. No. 78, Update 2)