Cities Index.
AR 28 ATTACHMENT A

Pasadena City Council
June 8, 2026

Document
AR 28 ATTACHMENT A
Meeting
June 8, 2026
Body
Pasadena City Council
Pages
5
Original file
3.2 MB
Text extracted from the city's file for reading and search. Open the original on ww2.cityofpasadena.net. That file is the official record.

Attachment A
FISCAL YEAR 2027 GENERAL FEE SCHEDULE
Note: The Fiscal Year 2026 General Fee Schedule was originally adopted June 16, 2025.December 8, 2025June 8, 2026 FEEDESCRIPTIONFY 2026

REVISED FEE
FY 2027

RECOMMENDED
FEE

FIRE DEPARTMENT
Base Rates Paramedic Ambulance Service
39EMS Transport$4,354.00$4,481.00
40 [Paramedic Subscription Fee$89.00$89.00
Mileage
41Mileage per mile$24.00$24.00
Special Charges - Paramedic Ambulance
42Basic Life Support Ambulance Supplies$34.00$34.00
43Advanced Life Support Ambulance Supplies$34.00$34.00
44Oxygen$125.00$128.00
45Electrocardiogram (EKG)$76.00$78.00
46 | Response Only-No Transport$435.00$447.00
47Cost Recovery for Apparatus and Personnel$269.00$276.00 48 | Medical Record Authorizations Pursuant to Evidence Code Section 1158Per StatutePer Statute Use of Paramedic Equipment Fee Exemptions: Refusal of service when patient DID NOT request response; determination of death without resuscitation. 49False Alarm Response (Second and subsequent responses within 12-month period)$463.00$558.00 50Fire Dept Response for willful or negligent acts, or acts in violation of Fire Code (1 hour minimum).

At CostAt Cost
51Fire Dispatch Fee$51.00$52.00
Rental/Lease of City Reserve Fire Engine and Ambulance for Non-Emergencies/Non- Mutual Aid
52Reserve Fire Engine, plus actual cost of personnel$70.00 per hour$70.00 per hour 53 [Reserve Rescue Ambulance, plus actual cost of personnel$77.00 per hour$77.00 per hour 54Type 1 Water Tender, plus actual cost of personnel$85.00 per hour$85.00 per hour Fireworks Violations
Possession Only of a Safe and Sane Firework, as defined in Health and Safety Code section 12529
55PMC 14.30.030 - First Violation of Possession Only of a Safe and Sane Firework$250.00$250.00 56 | PMC 14.30.030 - Second Violation of Possession Only of a Safe and Sane Firework$500.00$500.00 57PMC 14.30.030 - Each Additional Violation of Possession Only of a Safe and Sane Firework
$750.00$750.00
Possession Only of a Dangerous Firework, as defined in Health and Safety Code sections 12505 and 12561
58 | PMC 14.30.030 - First Violation of Possession Only of a Dangerous Firework$300.00$300.00 59PMC 14.30.030 - Second Violation of Possession Only of a Dangerous Firework$600.00$600.00 60PMC 14.30.030 - Each Additional Violation of Possession Only of a Dangerous Firework$800.00$800.00 Discharge Only of a Safe and Sane Firework, as defined in Health and Safety Code section 12529
61PMC 14.30.040- First Violation of Discharge Only of a Safe and Sane Firework$500.00$500.00 62PMC 14.30.040 - Second Violation of Discharge Only of a Safe and Sane Firework$750.00$750.00 63PMC 14.30.040- Each Additional Violation of Discharge Only of a Safe and Sane Firework$1,000.00$1,000.00 Discharge Only of
12505 and 12561.

Dangerous Firework, as defined in Health and Safety Code sections G4PMC 14.30.040-First Violation of Discharge Only of a Dangerous Firework$650.00$650.00 65PMC 14.30.040 - Second Violation of Discharge Only of a Dangerous Firework$850.00$850.00 66PMC 14.30.040 - Each Additional Violation of Discharge Only of a Dangerous Firework$1,000.00$1,000.00 67 | Fireworks / Pyrotechnic permit / inspectionNew$602.00 Hazardous Materials Permits/lnspections
Level I
68 |0-499 Pounds - Solids; 0-54 Gallons - Liquids; 0-199 Cubic Feet - Gases$145.00$149.00 Level II
69 |500-5,000 Pounds - Solids; 55-550 Gallons - Liquids; 200-2,000 Cubic Feet - Gases$292.00$300.00 Level III
705,001-25,000 Pounds - Solids; 551-2,750 Gallons - Liquids; 2,001-10,000 Cubic Feet - Gases
Level IV
$440.00$452.00

Page 1 of 5 ends

Attachment A
FISCAL YEAR 2027 GENERAL FEE SCHEDULE
Note: The Fiscal Year 2026 General Fee Schedule was originally adopted lune 15, 2025.December 8, 2025June 8, 2026 FEEDESCRIPTIONFY 2026

REVISED FEE
FY 2027

RECOMMENDED
FEE
71Over 25,00 Pounds - Solids; Over 2,750 Gallons - Liquids; Over 10,000 Cubic Feet - Gases$586.00$603.00 Surcharges (More Than One May Apply)
72Extremely Dangerous Materials Stored45%$161.00
73 | More Than Eight Chemicals45%$322.00
74All Other Hazardous Materials Handling Activities: At Cost (by Personnel). Fees are based on actual time required and the hourly rate of the personnel assigned, with a one-hour minimum. Hourly rates are fully burdened and include salary, benefits, and applicable overhead.
$169.00$181.00
75Hazardous Material processes / storage for non-H Occupancies (1 hour minimum, 15- minute increments thereafter)
New
At Cost
76HazMat: Plan review for public dining permits (1 hour minimum, 15-minute increments thereafter)
New
At Cost
77HazMat; Business license permit inspection for use of HazMat above threshold amountsNew$261.00 78HazMat: CERS reviews from regulated facilitiesNew$181.00 79HazMat: CalARP Risk Management Plan Reviews (5 year plan)New$1,227.00 Underground Storage Tanks
80 |Annual Operating Permit and Required Inspection (per tank)$377.00$388.00 81All Other Underground Tank Activities (per hour rate, 1 hour minimum, 15 minute increments)
$169.00$173.00
82 |Aboveground Tank Permit and Inspection (per tank)-Per Hr charge$169.00$173.00 83Penalty for California Environmental Reporting System CERS Late Submittal, per required Submittal (more than one may apply)
50%of Annual
Permit Fee
50% of Annual
Permit Fee
84 [Annual Inspection and Compliance Reporting Fee$48.00$49.00 85Risk Management Program (per unit)$490.00$490.00
86Filming Permit Fire Review, per Permit or Rider Review (billed in 15 minute increments)$148.96$153,32 87Filming Permit Fire Safety Officer Assignment Administration, per day assigned, per Permit or per Rider Review
$76.00$78.00
Hazardous Vegetation Inspection (P.M.C. 14.29) - Ordinance #6444 88 | Initial Inspection - (Fee waived, if compliance is made within 30 days)$202.00$207.00 89 jNon-Compliance Reinspection (2nd and 3rd Inspection)$863.00$888.00 90 |Additional Inspections (4th and Subsequent Inspections)$410.00$422.00 91AB 38 Brush inspectionNew$162.00
Inspections and Permits - (Excluding hazardous material) (P.M.C. Sec. 14.28.050) Rates are PER HOUR (minimum number of hours requirement may apply) 92Fire Inspection Billing Fee$18.50$18.50
93 |lnspections/Permits (Firefighter) - 30 minute minimums and increments$270.00$299.00 94 |lnspections/Permits (Fire Inspector)-30 minute minimumsand increments$147.00$128.00 95R1/R2 Inspections <16 unitsNew$147.00
96 | R1/R2 Inspections 16-50 unitsNew$220.00
97R1/R2 Inspections >51 unitsNew$441.00
98 | Detention FacilityNew$450.00
99 | Care Facility >6 clientsNew$235.00
100 I Hospitals, Nursing Homes, Mental Hospitals, & Surgical CentersNew$450.00 101 [ Pre-inspection of residential care facilityNew$163.00 102 ICommunity Care FacilityNew$163.00
103 | High RiseNew$594.00
104 |Schools & Child Care (E Occupancy)New$450.00
105 |Assembly OccupanciesNew$235.00
106 | Day Cares (1-4 Occupancy)New$235.00
Special StandbyNew
107 | OvercrowdingNew$237.00
108 (Dangerous & Hazardous OperationsNew$237.00
109 I Movie shootNew$196.00
110 |Speciat eventNew$237.00
IllPublic event, by requestNew$237.00
112Overtime Inspection (Firefighter) - 30 minute increments thereafter (before/after business hrs on City business day)
$270.00$578.00

Page 2 of 5 ends

Attachment A
FISCAL YEAR 2027 GENERAL FEE SCHEDULE
Note: The Fiscal Year 2026 General Fee Schedule was originally adopted June 16, 2025.December 8, 2025June 8, 2026 FEEDESCRIPTIONFY 2026

REVISED FEE
FY 2027

RECOMMENDED
FEE
113Overtime Inspection (Fire Inspector) - 30 minute increments thereafter (before/after business hrs on City business day)
$147.00$183.00
114 |Standby Firefighter - 4-hour minimum, billed in 30-minute increments thereafter$270.00$2,255.00 115Cancelled Standby Firefighter - 4-hour Minimum, billed in 30-minute increments thereafter
$270.00$2,255.00
116SPECIAL EVENT PERMITS / STANDBYS - 30-minute minimum, billed in 30-minute increments thereafter
$147.00$128.00
117 |Tents, canopies, temporary membranes Permit (per area covered) - 1-hour Minimum$147.00$128.00

FIRE CODE PERMITS (INCLUDES ONE INSPECTION)
118 lAerosolNew$195.00
119 lAmusement BuildingsNew$195.00
120 |Assembly<300 occupantsNew$195.00
121 [Assembly > 300 occupantsNew$304.00
122 ICarnivals/FairsNew$304.00
123 |Combustible Material Storage - recommend hourlyNew$195.00 124 | Compressed GassesNew$195.00
125 | CryogenicNew$195.00
126 |Dry Cleaning PlantsNew$195.00
127 | Dust Producing OperationNew$195.00
128 | Explosive/Blasting AgentsNew$195.00
129 |Flammable LiquidsNew$195.00
130 ICombustible LiquidsNew$195.00
131 | Fumigation & Insecticidal FoggingNew$195.00
132Hazardous MaterialsNew$195.00
133 | High Piled Combustible StorageNew$304.00
134Industrial OvensNew$195.00
135 |LP GasStorage/ExchangeNew$195.00
136 | Liquid/Compressed Gases - HazardousNew$195.00
137 |Liquid/Compressed Gases- IVledicalNew$195.00
138 | Lumber Yards & Woodworking PlantsNew$195.00
139 | Miscellaneous Combustible StorageNew$195.00
140 |Motor Vehicle Fuel DispensingNew$195.00
141 [Open Flames & CandlesNew$195.00
142 | Refrigeration EquipmentNew$195.00
143 |Repair& Service GarageNew$195.00
144 [Spraying or Dipping OperationNew$195.00
145 |Storage of Scrap Tires, Tire Byproducts & Tire RebuildingNew$195.00 146 | Hot WorkNew$195.00
147 |Self-Correction Verification for ReinspectionNew$46.00 148 |Non-Compliance Reinspection (2nd and 3rd Inspection)New$147.00 149 |Pre-citation Inspection (after third inspection)New$174.00 150 |Administrative Citation (after fourth unsuccessful inspection)New$736.00 Construction Permits (New, Alterations, Replacement, other than Hazardous Materials)
151 [Sprinkler System New Commercial - 100 heads or less with 1 riser$764.00$1,065.00 152 [Sprinkler System New Commercial - each additional RiserNew$219.00 153 [Sprinkler System New Commercial -101 to 200 heads$954.00$1,578.00 154 [Sprinkler System New Commercial - 201 to 300 heads$1,626.00$1,982.00 155 [Sprinkler System New Commercial - 301 to 400 heads$2,492.00$2,386,00 156 |Sprinkler System New Commercial - 401 to 500 heads$3,454.00$2,790.00 157 ISprinkler System New Commercial - Over 500 heads - each 100 heads$6,145.00$1,133.00 158 |Sprinkler System New Commercial-Over 1,000 heads-each 100 headsNew$404.00 159 [Sprinkler System Tenant Improvement-1 to 25 heads$184.00$405.00 160 jSprinkler System Tenant Improvement - 26 to 100 heads$472.00$553.00 161 |Sprinkler System Tenant Improvement - Over 101 heads, each 100 heads$662.00$621.00 162 [Sprinkler System 13 R Multifamily (3 -16 units per building)$2,105.00$1,174.00 163Sprinkler System 13 R Multifamily (17 and more units per building)New$1,578.00 164Sprinkler System 13 D One and Two Single Family Dwellings$938.00$661.00 165Underground Water System (up to 4 Buildings or Sprinkler Systems)$601.00$553.00

Page 3 of 5 ends

Attachment A
FISCAL YEAR 2027 GENERAL FEE SCHEDULE
Note: The Fiscal Year 2026 General Fee Schedule was originally adopted June 16, 2025.December 8, 2025June 8, 2026 FEEDESCRIPTIONFY 2026

REVISED FEE
FY 2027

RECOMMENDED
FEE
166 | Underground Water System (5 to 10 Buildings or Sprinkler Systems)$823.00$1,065.00 167 [Fire Pump (not including fuel system)$1,595.00$532.00 168 IWaterTank$726.00$424.00
169 | Emergency Generator (not including fuel system)$847.00$532.00 170 | Hood & Duct$662.00$578.00
171 | Dry Chemical$764.00$828.00
172Carbon Dioxide (C02)$1,082.00$424.00
173 | Foam/Liquid System$1,275.00$1,232.00
174 llnertGas/Halon$1,533.00$424.00
175 | Spray Booths$764.00$532.00
176ndustrial Ovens$1,147.00$424.00
177 |Vapor Recovery$1,147.00$532.00
178 | Dust Collection$1,147.00$532.00
179 | Refrigeration$1,241.00$532.00
180 | Medical Gas$823.00$424.00
181 | Industrial Gas$1,082.00$532.00
182 ] Fire Alarm 0 to 25 Devices$601.00$553.00
183 | Fire Alarm 26 to 100 Devices$1,082.00$957.00
184 | Fire Alarm 101 to 200 Devices$2,141.00$1,361.00
185 | Fire Alarm 201 to 500 Devices$2,877.00$1,765.00
186 ] Fire Alarm 501 to 750 Devices$3,838.00$2,169.00
187 | Fire Alarm 751 to 1,000 Devices$4,801.00$2,573.00 188 | Fire Alarm - Over 1,001 Devices, each 50 Devices$954.00$828.00 189 ISite Review - Fire Lane$250.00$424.00
190 |Site Review - Underground Fire Mains, 1-5 Hydrant/Risers$857.00$532.00 191Site Review - Gate Plan Detail (Access Gate/Knox)$281.00$74.00 192 |HPD (High Piled Storage)$2,012.00$544.00
193 |Tech Reports - Smoke Control - Alternate Methods of Protection - each$184.00$489.00 194 | Fire Marshal, additional per hour$305.00$385.00
195 | Plans Examiner, additional per hour$184.00$143.00 196Technical Specialist (Subcontractor): Services provided by third-party consultants shall be billed at actual cost, including contract administration and associated City overhead, if applicable. Rates may vary based on the scope of services and consultant utilized. $101.00At Cost
197New construction preliminary plan review only - fire flow & construction requirementsNew$336.00 198 | Parcel development/subdivision - plan review onlyNew$336.00 199Fire Alarm System (sprinkler monitoring, elevator recall, etc.) - PLAN REVIEW AND

INSPECTION
New$532.00
200Dry Cleaning Plants - PLAN REVIEW AND INSPECTIONNew$532.00 201 |Battery systems- PLAN REVIEW AND INSPECTIONNew$828.00 202Smoke control systems - PLAN REVIEW AND INSPECTIONNew$828.00 203Photovoltaic System - Commercial (if requested by building official) -PLAN REVIEW AND

INSPECTION
New$719.00
Architectural Reviews and Inspections
204 |A (Assembly) Occupancy - less than 1,500 square feetNew$424.00 205 |A (Assembly) Occupancy - 1,500 to 10,000 square feetNew$828.00 206 |A (Assembly) Occupancy - more than 10,000 square feetNew$1,232.00 207 |E (Educational) Occupancy (other than day careNew$532.00 208 | Day Care - E or 1-4 portableNew$532.00
209B (Business), F (Factory/lndustrial), M (Mercantile), S (Storage) Occupancies if requested by Building Dept.

New$424.00
210Repair Garage - Sl (include above ground hazardous materials review)New$424.00 211Structures for non-ambulatory or incapacitated occupancies: 1-1,1-2,12.1, R2.1 (HOURLY) New$828.00
212 |Structure with restrained occupants - 3 cells or lessNew$424.00 213 [Structure with restrained occupants -More than 3 cellsNew$828.00 R1/R2 Occupancy - Residential hotel, motel, apartment, condominium - PLAN REVIEW ONLY
214|^ 50 dwelling units per buildingNew$611.00

Page 4 of 5 ends

Attachment A
FISCAL YEAR 2027 GENERAL FEE SCHEDULE
Note: The Fiscal Year 2026 General Fee Schedule was originally adopted June 16, 2025.December 8, 2025June 8, 2026 FEEDESCRIPTIONFY 2026

REVISED FEE
FY 2027

RECOMMENDED
FEE
215 ]< 50 dwelling units per building - INSP ONLYNew$345.00 216 |51-150 units per buildingNew$906.00
217 |51-150 units per building- INSP ONLYNew$562.00
218 |>150 units per buildingNew$1,202.00
219 |>150 units per building - INSP ONLYNew$1,105.00
220 | R 3.1/R4 Licensed Residential Day Care/Assisted Living - 7-16 clientsNew$828.00 221Fire Clearance Inspection (for non-licensing requests for fire clearance from fire department)
New$192.00
222 |STD850 fire clearance (when requested by community care licensing/state agency)New$487.00 223 |Cellular Communicator Replacement/lnstallation (Fire Alarm)New$315.00 224 | Fire Alarm Panel ReplacementNew$315.00
225 | PV System (Single Family Dwelling)New$315.00
226 | PV System (Multifamily)New$463.00
227 |Two-Way Communication SystemNew$1,679.00
228 |Resubmittal Meetings (1 hour minimum, billed in 1 hour increments)NewAt Cost 229Alternate Method & Material Request - 2 hour minimumNew$719.00 230 [Written Response to Inquiry (1 hour minimum, billed in 1 hour increments)NewAt Cost 231 | Plan Resubmittal: charged on 3rd and subsequent submittals (minimum 1 hr)New$315.00 232Plan RevisionNew$315.00
233 |Re-stampofplansNew$168.00
234 |Accelerated Plan Review-1 hour minimum/additional 50% of feeNew$611.00 235Plan Review Time & Materials-1 hour minimumNew$163.00 236Reinspection fee: charged when project is not ready for inspection or not approved during initial inspection
New$128.00
237Inspection Cancellation Fee (inspections must be canceled at least 24 hours in advance to avoid the fee) - 50%
New$64.00
238 | Expedited Inspection - 1 hour minimum/additional 50% of feeNew$237.00 Miscellaneous Fees, Review, & Inspections
239 |Alternative Method Request/Deferred Submittal RequestNew$611.00 240 |Cell Tower (outside roof, pole, etc.)New$242.00
241 | Design Review/Consultation Meeting - Hourly Rate (1/2 hour minimum)New$611.00 242 ITechnical ResearchNew$611.00
243 ] New Business InspectionNew$192.00
244 | Perimeter Fencing/Gates Plan reviewNew$424.00
245 [Single Family Dwelling ReviewNew$572.00
246 I Public Schools Site ReviewNew$572.00
247 |Over-the-Counter Plan review - Hourly Rate (1 hour minimum)New$315.00 248 lOvertime Inspection/Review - After Normal Office Hours (2 hour minimum)New$237.00 249 [Expedited Plan Review, in addition to normal feeNew$611.00 250 ISpecial Requests or Uncategorized - Hourly Rate (1 hour minimum)NewAt Cost 251 | Investigation of Construction Without a Permit (1 hour minimum)New$196.00 Administrative Fees
252Fire Reports, Per Copy$22.00$25.00
253File Review - Hourly Rate (to be prorated to the nearest quarter hour)NewAt Cost 254Fire Prevention Personnel - Hourly Rate (to be prorated to the nearest quarter hour)NewAt Cost

Page 5 of 5 ends
← All documents from this meeting