Attachment C
REVISED FEES
FISCAL YEAR 2027 GENERAL FEE SCHEDULE
FY 2027
Fee f(
Fire
Description
FY 2026
REVISED FEE
FY 2027
RECOMMENDED |
FEE ;
Validation of FY26 to
27 Fees
Change from FY 26
Revised Fee
49alse Alarm Response (Second and subsequent responses within 12-month period)$463.00$558.0020.5184%$95.00 50Fire Dept Response for willful or negligent acts, or acts in violation of Fire Code (1 hour minimum).
At CostAt Cost
72Extremely Dangerous Materials Stored45%$161.000.0000% 73More Than Eight Chemicals45%$322.000.0000%
74All Other Hazardous Materials Handling Activities: At Cost (by Personnel). Fees are based on actual time required and the hourly rate of the personnel assigned, with a one-hour minimum.
Hourly rates are fully burdened and include salary, benefits, and applicable overhead. $169.00$181.007.1006%$12.00
93inspections/Permits (Firefighter) - 30 minute minimums and increments$270.00$299.0010.7407%$29.00 94Inspections/Permits (Fire Inspector) - 30 minute minimums and increments$147.00$128.00-12.9252%($19.00) 112Overtime Inspection (Firefighter) - 30 minute increments thereafter (before/after business hrs on City business dav)
$270.00$578.00114.0741%$308.00
113Overtime Inspection (Fire Inspector) - 30 minute increments thereafter (before/after business hrs on Citv business dav)
$147.00$183.0024.4898%$36.00
114Standby Firefighter - 4-hour minimum, billed in 30-minute increments thereafter$270.00$2,255.00735.1852%$1,985.00 115Cancelled Standby Firefighter - 4-hour Minimum, billed in 30-minute increments thereafter$270.00$2,255.00735.1852%$1,985.00 116SPECIAL EVENT PERMITS / STANDBYS - 30-minute minimum, billed in 30-minute increments thereafter
$147.00$128.00-12.9252%($19.00)
117Tents, canopies, temporary membranes Permit (per area covered) - 1-hour Minimum$147.00$128.00-12.9252%($19.00) 151Sprinkler System New Commercial - 100 heads or less with 1 riser$764.00$1,065.0039.3979%$301.00 153iprinkler System New Commercial - 101 to 200 heads$954.00$1,578.0065.4088%$624.00 154Sprinkler System New Commercial - 201 to 300 heads$1,626.00$1,982.0021.8942%$356.00 155Sprinkler System New Commercial - 301 to 400 heads$2,492.00$2,386.00-4.2536%($106.00) 156Sprinkler System New Commercial - 401 to 500 heads$3,454.00$2,790.00-19.2241%($664.00) 157Sprinkler System New Commercial - Over 500 heads-each 100 heads$6,145.00$1,133.00-81.5622%($5,012.00) 159Sprinkler System Tenant Improvement -1 to 25 heads$184.00$405.00120.1087%$221.00 160Sprinkler System Tenant Improvement - 26 to 100 heads$472.00$553.0017.1610%$81.00 161Sprinkler System Tenant Improvement - Over 101 heads, each 100 heads$662.00$621.00-6.1934%($41.00) 162Sprinkler System 13 R Multifamily (3 -16 units per building)$2,105.00$1,174.00-44.2280%($931.00) 164Sprinkler System 13 D One and Two Single Family Dwellings$938.00$661.00-29.5303%($277.00) 165Underground Water System (up to 4 Buildings or Sprinkler Systems)$601.00$553.00-7.9867%($48.00) 166Underground Water System (5 to 10 Buildings or Sprinkler Systems)$823.00$1,065.0029.4046%$242.00 167Fire Pump (not including fuel system)$1,595.00$532.00-66.6458%($1,063.00) 168Water Tank$726.00$424.00-41.5978%($302.00)
169Emergency Generator (not including fuel system)$847.00$532.00-37.1901%($315.00) 170Hood & Duct$662.00$578.00-12.6888%($84.00)
171Dry Chemical$764.00$828.008.3770%$64.00
172:arbon Dioxide (C02)$1,082.00$424.00-60.8133%($658.00) 173Foam/Liquid System$1,275.00$1,232.00-3.3725%($43.00) 174Inert Gas/Halon$1,533.00$424.00-72.3418%($1,109.00)
175Spray Booths$764.00$532.00-30.3665%($232.00)
176Industrial Ovens$1,147.00$424.00-63.0340%($723.00)
177Vapor Recovery$1,147.00$532.00-53.6181%($615.00)
178Dust Collection$1,147.00$532.00-53.6181%($615.00)
179Refrigeration$1,241.00$532.00-57.1313%($709.00)
180Medical Gas$823.00$424.00-48.4812%($399.00)
181Industrial Gas$1,082.00$532.00-50.S31S'/.($550.00)
182Fire Alarm 0 to 25 Devices$601.00$553.00-7.9867%($48.00) 183Fire Alarm 26 to 100 Devices$1,082.00$957.00-11.5527%($125.00) 184Fire Alarm 101 to 200 Devices$2,141.00$1,361.00-36.4316%($780.00) 185Fire Alarm 201 to 500 Devices$2,877,00$1,765.00-38.6514%($1,112.00) 186Fire Alarm 501 to 750 Devices$3,838.00$2,169.00-43.4862%($1,669.00) 187Fire Alarm 751 to 1,000 Devices$4,801.00$2,573.00-46.4070%($2,228.00) 188Fire Alarm - Over 1,001 Devices, each 50 Devices$954.00$828.00-13.2075%($126.00)
Attachment C
REVISED FEES
FISCAL YEAR 2027 GENERAL FEE SCHEDULE
FY 2027
Fee #DescriptionFY 2026
REVISED FEE
FY 2027
RECOMMENDED
FEE i
Validation of FY26 to I Change from FY 26
27 Fees i Revised Fee
189Site Review - Fire Lane$250.00$424.0069.6000%$174.00 190 [Site Review - Underground Fire Mains, l-5 Hydrant/Risers$857.00$532.00-37.9230%($325.00) 191 ISite Review - Gate Plan Detail (Access Gate/Knox)$281.00$74.00-73.6655%($207.00) 192 |HPD (High Piled Storage)$2,012.00$544.00-72.9622%($1,468.00) 193 |Tech Reports - Smoke Control - Alternate Methods of Protection - each$184.00$489.00165.7609%$305.00 194Fire Marshal, additional per hour$305.00$385.0026.2295%$80.00 195Plans Examiner, additional per hour$184.00$143.00-22.2826%($41.00) 196:Technical Specialist (Subcontractor): Services provided by third-party consultants shall be billed at actual cost, including contract administration and associated City overhead, if applicable. Rates may vary based on the scope of services and consultant utilized. $101.00At Cost
252Fire Reports, Per Copy$22.00$25.0013.6364%$3.00