Attachment D
DELETED FEES
FIRE DEPARTMENT FISCAL YEAR 2027 GENERAL FEE SCHEDULE
FY 2026
Fee (fDescriptionFY 2026
REVISED FEENotes
fire
50 69
79 80
81 82
87 88
95 96
97 98
99 123
135
Fire Reports, Per Copy MAXIMUM
Hazardous Materials Spill Response
Closed Day Inspection (Firefighter) -4-hour minimum, billed in 15- minute increments thereafter, [when City offices are closed) Closed Day Inspection (Fire Inspector) - 1-hour minimum, billed in 15- minute increments thereafter, (when City offices are closed) Cancelled Overtime Inspection (Firefighter) - 4-hour Minimum, billed in 15-minte increments thereafter
Cancelled Closed Day Inspection (Firefighter) - 4-hour Minimum, billed in 15-minute increments thereafter
Sprinkler System New Commercial -1 to 25 heads
Sprinkler System New Commercial - 26 to 50 heads
Sprinkler System New Commercial - 2001 to 3000 heads
Sprinkler System New Commercial - 3001 to 4000 heads
Sprinkler System New Commercial - 4001 to 5000 heads
Sprinkler System New Commercial - 5001 to 6000 heads
Sprinkler System New Commercial - Over 6,000, each 100 heads 102 [Sprinkler System Tenant Improvement- 51 to 100 heads System Piping & Manifolds
Tech Reports - Smoke Control - Alternate Methods of Protection - 6 At Cost
At Cost
$270.00
$147.00
$270.00
$270.00
$281.00
$377.00
$3,607.00
$11,149.00
$12,491.00
$14,033.00
$764.00
$662.00
$1,082.00
$1,147,00
The Department recommends removing these fees from the FY 2027 General Fee Schedule. Following an independent third-party review, the associated costs have been consolidated into the revised fee structure, resulting in a clearer and more transparent schedule that better reflects the actual cost of Fire Prevention Bureau services.