Public Works
Capital Projects Update
August 5, 2025
2 Projects in Progress
In-Progress Project Name Current Activity Public Impact Est. Completion Sherwood Waterline
Upgrades
Replacing water services Service interruptions; traffic control
November 2025
Creston Road Corridor
Phase 1
Traffic signal, paving, and
striping
Traffic control from Orchard
to S. River
February 2026
Public Safety Training
Facility
Finish paving No impact August 2025
Sherwood Park Pickleball
Court Complex
Parking lot, court lighting, and
curbs
Sidewalk closed along Via
Ramona
End of May 2026
Flamson School Pedestrian
Enhancements
Curb ramps and sidewalks are
under construction
Sidewalk closure north of
24th Street at Oak. Curb
ramps will not be
accessible for pedestrians
September 2025
3 In-Progress Project Name Current Activity Public Impact Est. Completion Downtown Parking Lot
Improvements
Retaining wall construction at
12th Street
12th and Railroad closed to
the public
December 2025
Annual Pavement Refresh of
Striping
Removal of existing striping and
placing new thermoplastic
striping, and raised placement
makers
Intermittent traffic control August 2025
Road repairs at Sleepy
Hollow, Cathedral Canyon,
Crystal Court, Tuley,
Rosemay, Ginger, and
Katherine
Curb ramps, dig-out repairs, and
asphalt overlay
Intermittent traffic control September 2025
4 • Sherwood
Water Mains
• Trenching at
Santa Fe to install
water mains.
•• Waterline installed
across Creston
Road, per the
Master Plan, to
improve fire flow.
5 • Creston Road
Corridor Phase 1
• First level of asphalt
placed with temporary
striping.
• Traffic signals at
Walnut/Bolen/Creston
are being installed.
6 7
Public Safety
Training Facility
The concrete pad and
the adjacent driveway
for the Training Tower
are completed.
Before
After
• Pickleball Court • Grading of the
parking lot is
currently in
progress.
8 • Pickleball Court • The court is
now paved
with the fence
posts and
court lighting
bases
installed.
9 10
Flamson Pedestrian
Improvements
Sidewalk north of 24th
Street is complete
• Flamson
Pedestrian
Improvements • Curb ramps
at south of
24th and east
and west side
of Oak are in
progress
11 12th & Railroad
Parking Lot Repairs
Constructors’ first order of
work is the removal and
replacement of the
retaining wall at 12th St
12 • Annual Pavement
Striping Refreshment
• Portions of 1st Street—Oak to Spring
• South River Road—south of Creston
and north of Navajo
• River Oaks Drive—South River to
Buena Vista
• Experimental Station—South River
to Buena Vista
• Airport Road—Hwy 46 east to Tower
Road
13 River Oaks Drive
1st Street
• Measure I
-24
• Roads completed: o - Sleepy Hollow o - Cathedral Canyon o - Crystal Court o - Tuley Road o - Rosemary o - Ginger o - Katherine • A portion of the asphalt trail along Charolais was
repaired due to root
intrusion.
14 15
Upcoming
Projects
Upcoming Project Name Description Status Est. Start Date Crestline and Fairview
Neighborhood Road
Repairs
Dig-out repairs replace AC berm
with concrete at park perimeter,
and dig-out repairs asphalt
overlay
Out to bid
Bids due August 21, 2025
November /
December 2025
West Side Fiberized Slurry
Seal
Install concrete cross gutters,
dig-out repairs, and place
fiberized slurry seal
Out to bid
Bids due August 21, 2025
November /
December 2025
Riverside / Capitol Hill /
Almond Court Pipeline
Repairs
Repair old pipelines in
preparation of repairing road
surface
Bids opened July 10, 2025
CC agenda August 5, 2025
October /
November 2025
Creston Road Phase 2 Roundabout at Rolling Hills curb
ramps, sidewalks, decorative
lights, landscaping, signal
modification, and road
resurfacing
95% final plans for bid
advertising
1st Quarter 2026
16 17
Creston Road
Corridor Phase 2
• Continuation of
sidewalk construction
• Numerous pipelines
installations at the
proposed
roundabout at
Creston and Rolling
Hills Existing and New (Black)
Pipeline @ Rolling Hills
18 • Please visit the City’s website for a full list of city projects and current status: prcity.com/363