Larry Moore Park

APPROVAL OF THE LARRY MOORE PARK

REVITALIZATION CONCEPT AND AUTHORIZATION TO

COMPLETE FINAL DESIGN
Call (805) 865-7276 to provide public comment during the meeting Background
• Neighborhood park developed in 1980s
• Decline in maintenance funding led to
deterioration
• City assumed ownership in 2016 and
restored key amenities

1. Additional
Factors
• Need for additional youth
sports fields identified
• Proceeds from Pioneer Park sale
used to fund design
Project Scope
Landscape Architecture
David Volz Design
CEQA and Transportation
Services Analysis
SWCA Environmental
Consultants
Community Outreach
• 3 outreach workshops (2024–2025)
• Parks and Recreation Advisory
Committee review (December 2025)
Community
Concerns
Key community concerns
identified through outreach:
◦ Traffic and parking impacts
◦ Lighting and neighborhood impacts
◦ Increased park usage
◦ Safety and homelessness
Design Responds to Community Input
97 parking spaces to
address parking
overflow
Below grade parking
lot to mitigate noise,
lighting, and visual
impacts
Controlled access
with lockable gates
Youth-focused
design to limit
intensity of use
Energy-efficient LED
lighting for visibility
and controlled use
Vehicle-graded
perimeter trail
Park Features
3 lighted youth
athletic fields
Playground areas
and climbing
features
Lighted
basketball and
drop shot court
Picnic areas and
shade structures
Restrooms,
storage, and
spectator seating
Native garden Senior fitness
area
Trail connections
to Riverwalk
system
Ongoing
Studies in
Support of
Project
Design
• Traffic circulation, speed,
intersection performance
Transportation
Analysis
• Biology, cultural, and air
quality
Environmental
Review (CEQA
Compliance)
Concept
Approval
Allows
Project to
Advance to
Final Design CEQA
Process will
include:

Preparation and public review of Initial
Study/Mitigated Negative Declaration
Final consideration by City Council along
with final design
Approval of
concept
plan allows
project to
advance to:

Final design and construction documents
Completion of traffic and environmental
studies
Financial
Outlook
Project will need to be reviewed along with other City park priorities, including:

Beechwood Park Parks & Trails Master
Plan
Additional westside
park space
Future phase (post final design) will identify funding for construction Design funding previously approved by City Council
Recommendation
Approve the Larry Moore Park
Concept Plan, direct staff to complete
the design documents, and find this
action exempt from CEQA pursuant to
State Guidelines Section 15262.
[email protected]
august 2025
Larry Moore Park
Larry Moore Park Concept Design
Overall Site Plan
25 1
5 3
23 24
16 4
1 7
18 2
7 8
21 15 23 14
13 20
18 12
15 23
19 17
10 19
10 4
11 20
16 19
23 17
6 20
26 26
22 22
9 27
27 21
LEGEND
Parking lot - 91 Spaces w/ 6 Handicap Stalls
New 6 Stall Restroom Building and Storage Area
New 3 Stall Restroom Building and Storage Area
New Field/Park Storage Buildings (2)
Salinas River Critters Playground
Pollinator Play Space and Pollinator Garden
Covered Paseo for Special Events (Farmers Market, Foot Truck, Etc.) Basketball Court - Lighted
Drop Shot Court
Sport Fields, 2 Baseball/Softball U12 Fields (with Lights) and U12 Soccer Musco Field Lighting for Sports Field - 10 Total
Fitness Area with Shade Structure and Seating, Senior Friendly Equipment Rock Climbing and Slack Line Area
California Native Low Maintenance Demonstration Garden and Art Silo Shade Structure - Small Group Picnic Area
Silo Shade Structure - Large Group Picnic Area
Fabric Shaded Structure - Large Group Picnic Area
Open Lawn and Passive Space
Shaded Spectator Bleachers
10’ Wide Paved Trail, Vehicular Rated with 4’ Wide Adjacent DG Path Stairs & ADA compliant walkway
Oak Tree Grove
Bridge Pedestrian and Vehicular Rated
New Vehicular Primary Entry and Exit, with Lockable Gates Vehicular Exit Only Driveway, with Lockable Gates
Existing Drain Swale w/ Enhanced Riparian Planting
Connection to Existing Trail System
123456789
10 11
12 13
14 15
16 17
18 19
20 SALINAS RIVER

RIVERBANK LANE

BRIDGEGATE LANE
21 22
0 25 50
NORTH
23 24
25 26
27 [email protected]
august 2025
Larry Moore Park
River Critter Playground and Pollinator Garden -
Plan Enlargement and Design Imagery

EMBANKMENT SLIDE NATURAL PLAYGROUND WITH SIMULATED RIVER BEAVER CRITTER CLIMBERS POLLINATOR HABITATS

POLLINATOR AND FLOWER EDUCATION PANELS SIMULATED DRY CREEK

BEAVER DAM LOG CLIMBER INTERACTIVE POLLINATOR AND FLOWER SCULPTURES POLLINATOR GARDEN POLLINATOR CRITTER CLIMBERS

BIRD AND CRITTER HABITATS LOG CLIMBER PLAYGROUND ELEMENT WITH BEAVER DAM RIVER CRITTER CLIMBERS

LOG CLIMBER PLAYGROUND ELEMENT WITH BRIDGE ACCESS

RIVER CRITTER PLAYGROUND AND POLLINATOR GARDEN ENLARGEMENT 0 10 20
NORTH
LEGEND
5-12 Log Climber Structure with Slides and Shade Sail
Elevated Walkway to Access Wood Bridge and Slides
Embankment Slides (2)
Fallen Log Climbers and Beaver Dam
Beaver Dam Bridges
Rope Swing
Basket Swing
3 Bay Swing Set
River Critters Climbers
1 2
3 4
5 6
7 8
9 LEGEND
Simulated Salinas River and Paso Robles Rolling Hills Play Surfacing Simulated Dry Creek, connecting to Drainage Ravine
Silo Shade Structure with Group Seating for Education Gatherings Pollinator Critter Climbers
Pollinator Garden
Interactive Pollinator/Flower Sculptures and Panels
3 Stall Bathroom and 115 sf of Storage Building
Large Group Shaded Picnic Area with BBQs
10’ Concrete Trail with 4’ DG path and Split Rail Fence 10 11
12 13
14 15
16 17
18 1
2 2
3 4
4 5
5 6
7 8
9 10
10 11
12 13
13 14
15 15
16 17
18 18
[email protected]
august 2025
Larry Moore Park
Sport Fields -
Plan Enlargement and Design Imagery
LEGEND
U12 and under Baseball/Softball fields
U12 and under Soccer Field Overlay with Goals
Shaded Dugouts
Shaded Metal Bleachers
All dirt infield
200 sf Maintenance/Storage Building (2 Total)
Fenced Bullpen at each Dugout
Musco Field Lights, 10 Lights Total
Large Group Picnic Area with 3 Silo Shade Structures, BBQs and Tables 1 2
3 4
5 6
7 8
9 LEGEND
Mounded Open Lawn Area for additional spectator seating Oak Grove Area
10’ Concrete Trail with 4’ DG path and Split Rail Fence Trail Connection down into Salinas River
Vehicular Rated Bridge at Existing Drainage Ravine
10 11

BACKSTOP WITH SHADED SEATING OAK GROVE PICNIC SEATING WITH SHADE

BASEBALL/SOFTBALL BLEACHERS AND SHADE STRUCTURE COMMUNAL PICNIC FURNITURE AND GATHERING SPACE

BASEBALL/SOFTBALL DUGOUT AND SHADE STRUCTURE YOUTH SOCCER FIELD OVERLAY PICNIC SEATING

COMMUNAL PICNIC FURNITURE AND GATHERING SPACE RIVER TRAIL WALKING AND HIKING TRAIL

BASEBALL/SOFTBALL DUGOUT AND SHADE STRUCTURE

PICNIC SEATING COMMUNAL GATHERING SILO STRUCTURE

SPORT FIELDS ENLARGEMENT
0 15 30
NORTH
12 13
14 1
1 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 12
12 13
14 10
[email protected]
august 2025
Larry Moore Park
Public Paseo, Sport Courts, Restroom Building and Native Garden - Plan Enlargement and Design Imagery

COMMUNAL SEATING AT PASEO PASEO MODULAR SHADE STRUCTURE INFORMAL SEATING STACKS DROP SHOT GAME

COMMUNAL SEATING AT PASEO PUBLIC ART SCULPTURES AT NATIVE GARDEN

FOOD TRUCK/COMMUNITY EVENTS AT PASEO SILO SHADE STRUCTURE BRIDGES AT NATURAL DRAINAGE RAVINES FULL SIZE BASKETBALL COURT WITH ART OVERLAY

CALIFORNIAN NATIVE PASSIVE GARDEN CALIFORNIAN NATIVE PASSIVE GARDEN

CALIFORNIAN NATIVE PASSIVE GARDEN INFORMAL SEATING CUBES AT PASEO

PUBLIC PASEO AREA WITH SHADE AND SEATING PREFABRICATED RESTROOM STRUCTURE

PUBLIC PASEO, SPORT COURTS, RESTROOM BUILDING AND NATIVE GARDEN ENLARGEMENT 0 10 20
NORTH
LEGEND
26’ Wide Paved Pedestrian Paseo, 13’ path for Food Truck Access Informal Mixed Furniture for Small or Large Gatherings
Modular Fabric Shade Structure over Paseo
DG Paving with Gridded Planting Areas under Paseo
6 Stall Bathroom and 230 sf of Storage Building
Open Lawn Space
‘Oak Leaves’ Art Pattern, Full Court Basketball
‘Oak Leaves’ Art Pattern, Drop Shot Court
Field Entry Gateway
1 2
3 4
5 6
7 8
9 LEGEND
Tree Grove at Paving Plaza, Tree Grates
Specimen Oak
Pedestrian Bridge over Existing Drainage Ravine
Silo Shade Structure Picnic Area
Low Maintenance California Native Demonstration Garden
Public Art Garden Opportunity
Pedestrian Access from Street, Stair and Ramp
10 11
12 13
14 15
16 1
1 2
2 3
3 4
5 6
6 7
8 9
10 10
11 12
13 14
15 16
16 6
[email protected]
august 2025
Larry Moore Park
North End Fitness, Open Lawn and Recreation Sport -
Plan Enlargement and Design Imagery
0 10 20
NORTH

FITNESS AREA WITH SHADE STRUCTURE NATIVE OAK PLANTINGS ROCKWALL CLIMBING ACTIVITY

PICNIC SEATING SPECIMEN SHADE TREE AT LAWN

OPEN SPACE LAWN FOR ACTIVE PROGRAMMING SLACK LINE ACTIVITY OPEN SPACE LAWN FOR PASSIVE USE

FITNESS AREA WITH SHADE STRUCTURE FABRIC SHADE STRUCTURE OVER FITNESS AREA

NATIVE PLANTING ALONG TRAIL BALANCE BOARD ACTIVITY

NATIVE PLANTING ALONG TRAIL

NORTH END FITNESS, OPEN LAWN AND RECREATION SPORT ENLARGEMENT LEGEND
Outdoor fitness area, 11 machines total. With fabric shade structure and various seating areas around machines. Fitness equipment will be available for use of all age groups, including seniors
Large Open Lawn
Specimen Shade Trees in Open Lawn
Slack Line and Rock Climbing Activity Area
Open Lawn at Activity Area
Silo Shade Structure Picnic Area
Existing Vegetated Drainage Ravine
1 2
3 4
5 6
7 LEGEND
Overlook Lawn area with Seating
Oak Grove Area
10’ Concrete Trail with 4’ DG path and Split Rail Fence Trail Connection down into Salinas River
Vehicular Rated Bridge at Existing Drainage Ravine
8 9
10 11
12 1
2 3
3 4
5 6
7 7
8 9
10 10
11 12
[email protected]
august 2025
Larry Moore Park
Conceptual Design 3d Views

COVERED PASEO GATHERING AREA AND INFORMAL SEATING

COVERED PASEO GATHERING AREA AND PASSIVE LAWN

SHADED BLEACHERS AT BALL FIELDS

SPORTS COURT AT PASEO AND BALL FIELDS
[email protected]
august 2025
Larry Moore Park
Conceptual Design 3d Views
SALINAS RIVER CRITTER ‘BEAVER’ PLAYGROUND’
SALINAS RIVER CRITTER ‘BEAVER’ PLAYGROUND’
‘SILO’ GROUP PICNIC AREA AT BALL FIELDS
SALINAS RIVER CRITTER ‘BEAVER’ PLAYGROUND’
[email protected]
august 2025
Larry Moore Park
Site Lighting - Design and Character Images

EXISTING STREET LIGHT

RIVERBANK LANE

PROPOSED PARKING LOT

PROPOSED
BERM

EXISTING

HOUSE PLOTS

RIVERBANK LANE PROPOSED BERM PROPOSED PARKING LOT

EXISTING STREET LIGHT

PROPOSED PAVED

PATHWAY

RIVERBANK LANE PROPOSED

BERM PROPOSED PARKING LOT

EXISTING

HOUSE PLOTS

PROPOSED PAVED PATHWAY

PROPOSED PARK

PROPOSED PARK

PROPOSED PARK

EXISTING

HOUSE PLOTS

PROPOSED PARKING

LOT LIGHT WITH OPTIC

CONTROL PROPOSED PEDESTRIAN

LIGHT WITH OPTIC

CONTROL

PROPOSED PARKING

LOT LIGHT WITH OPTIC

CONTROL

PROPOSED PARKING

LOT LIGHT WITH OPTIC

CONTROL

PROPOSED PEDESTRIAN

LIGHT WITH OPTIC

CONTROL

EXISTING STREET LIGHT

PROPOSED PAVED

PATHWAY

PROPOSED PEDESTRIAN

LIGHT WITH OPTIC

CONTROL

SECTION KEY MAP
SECTION 3
SECTION 2
SECTION 1
1 2 3

LIGHT GLARE REDUCED

WITH CUTOFF AND LED

TECHNOLOGY

LIGHT CUTOFF KEEPS LIGHT

FOCUSED ON SPORTS FIELDS, NO

LIGHT SPILLAGE INTO REST OF

THE PROJECT

SENSITIVE HABITAT AND

ADJOINING NEIGHBORHOOD

BUFFERED FROM WASTE LIGHT

SPORT LIGHTING TECHNOLOGY

ADVANCEMENT TO REDUCE THE
AMOUNT OF THE ‘SOURCE’ LIGHT FOR

BOTH ATHLETES AND SPECTATORS

MULTI USE LIGHT ALLOWS FOR

FLEXIBILITY IN SPECIFIC ZONES

DOWNWARD LIGHT FIXTURE TO

HELP REDUCE LIGHT SPILLAGE

AND CONTROL UNWANTED LIGHT

WASTE INTO NEIGHBORHOOD

SMALL BOLLARD FIXTURES

IN SENSITIVE ZONE TO HELP

REDUCE LIGHT SPILLAGE INTO

NEIGHBORHOOD

MUSCO FIELD LIGHTING WITH CUTOFF CONTROL MUSCO FIELD LIGHTING WITH CUTOFF CONTROL MUSCO FIELD LIGHTING WITH CUTOFF CONTROL

EXAMPLE PARKING LOT LIGHT CONTROL MUSCO FIELD LIGHTING WITH CUTOFF CONTROL SPORT GLARE REDUCING TECHNOLOGY

OLD TECHNOLOGY PROPOSED TECHNOLOGY

PASEO/EVENT LIGHT POLE PARK WIDE LIGHT FIXTURE PARK WIDE BOLLARD FIXTURE PARKING LOT LIGHT FOCUSED AND KEPT ON PAVING, NO SPILLAGE EXAMPLE: NO BACK CONTROL, LIGHT SPILLS EXAMPLE: WITH CUTOFF CONTROL, LIGHT FOCUSED [email protected]
august 2025
Larry Moore Park
Larry Moore Park Concept Design
Overall Site Plan
25 1
5 3
23 24
16 4
1 7
18 2
7 8
21 15 23 14
13 20
18 12
15 23
19 17
10 19
10 4
11 20
16 19
23 17
6 20
26 26
22 22
9 27
27 21
LEGEND
Parking lot - 91 Spaces w/ 6 Handicap Stalls
New 6 Stall Restroom Building and Storage Area
New 3 Stall Restroom Building and Storage Area
New Field/Park Storage Buildings (2)
Salinas River Critters Playground
Pollinator Play Space and Pollinator Garden
Covered Paseo for Special Events (Farmers Market, Foot Truck, Etc.) Basketball Court - Lighted
Drop Shot Court
Sport Fields, 2 Baseball/Softball U12 Fields (with Lights) and U12 Soccer Musco Field Lighting for Sports Field - 10 Total
Fitness Area with Shade Structure and Seating, Senior Friendly Equipment Rock Climbing and Slack Line Area
California Native Low Maintenance Demonstration Garden and Art Silo Shade Structure - Small Group Picnic Area
Silo Shade Structure - Large Group Picnic Area
Fabric Shaded Structure - Large Group Picnic Area
Open Lawn and Passive Space
Shaded Spectator Bleachers
10’ Wide Paved Trail, Vehicular Rated with 4’ Wide Adjacent DG Path Stairs & ADA compliant walkway
Oak Tree Grove
Bridge Pedestrian and Vehicular Rated
New Vehicular Primary Entry and Exit, with Lockable Gates Vehicular Exit Only Driveway, with Lockable Gates
Existing Drain Swale w/ Enhanced Riparian Planting
Connection to Existing Trail System
123456789
10 11
12 13
14 15
16 17
18 19
20 SALINAS RIVER

RIVERBANK LANE

BRIDGEGATE LANE
21 22
0 25 50
NORTH
23 24
25 26
27 Recommendation
Approve the Larry Moore Park
Concept Plan, direct staff to complete
the design documents, and find this
action exempt from CEQA pursuant to
State Guidelines Section 15262.