CITY OF PATTERSON
Planning Commission Statf Report
AT&T Wireless Tower - Centennial Park
Conditional Use Permit #20-03, Negative Declaration #21-02 January 13, 2022 Meeting

PROJECT SUMMARY
Consideration of a Conditional Use Permit for an unmanned wireless facility (cell tower) located on the east side of Ward Avenue, approximately 500 feet north of the intersection of West Las Palmas Avenue, APN 048-048-010. The facility would include an 84.9' tall decorative bell tower, an 8'x8' pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. A draft Negative Declaration has been prepared noting that the project Would not have a significant impact on the environment under the California Environinental

APPLICANT AND SITE INFORMATION
Applicant: New Cingular Wireless PCS
Property Owner: City of Patterson
Environmental Review: Draft Negative Declaration
Location: East side of Ward Avenue, approximately 500
feet north of West Las Palmas Avenue
Assessor Parcel Numbers: 048-048-010
Project Size: Approximately 900 sq. ft., excluding an access and utility easement
General Plan Designation: HR, High-density Residential
Zoning Designation: HR, High-density Residential
Present Use: Existing Vacant Space
Surrounding Land Uses: Single family housing

PROJECT DESCRIPTION AND ANALYSIS
Conditional use permit review is used to determine whether a land use is, and will continue to be, compatible with the current and potential surrounding land uses and to ensure that the use will not become a nuisance to the surrounding land uses. Cell towers typically require a conditional use permit, due to the potential for aesthetic and maintenance issues associated with a structure of this height and mass.

The project is an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, an 8' × 8' pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project would be located near the southwest corner of the noted lot, on a 900 square foot area. An access easement would be extend from Ward Avenue to provide all- weather access to the site.
1 The project site is located on City-owned property purchased in 2019 and approved for the Centennial Park project. This park is a joint effort between the City and the Patterson Joint Unified School District. The site would include facilities such as a community center, the school district's performing arts theater, playgrounds, sport courts, and other recreation facilities.

Aesthetics
To conceal antennas and equipment as much as possible, the Municipal Code requires that all equipment shall be obscured from view or disguised, so as not to appear as telecommunication equipment. The City typically pursues towers disguised as palm trees, related to this requirement, however, in this instance, such a "mono-palm" may look out of place. The proposed project includes a tower disguised as a decorative bell tower, and a solid wall to screen the ground equipment from view. The bell tower design was selected to blend with the proposed architecture found in the community generally, and with the planned Centennial Park proposal specifically. The bell would be for aesthetic purposes only and would not be used to generate sound
To further reduce the potential aesthetic impact of cell towers on the skyline, co-location, or the placement of additional equipment on existing towers is encouraged through a staff level approval process. The proposed project includes space allowing for such co-location.

Noise
The project includes a generator to serve the facility during power outages. A noise analysis was prepared and reviewed as part of the environmental review. This study determined that the project would not generate noise levels that are considered significant.

Height
The municipal code allows tower to project a maximum of 15 feet above the maximum height outlined in the zoning district where it is located. The maximum height allowed in the High Density Residential Zone, where the project is located, is 45'. The 15' projection would allow a maximum height of 60°. As noted, the applicant is requesting an 84.9° tower. The municipal code also includes provisions, specific to wireless communications towers, allowing the Planning Commission to approve additional height, as long as the tower meets specific criteria:
1) The project is required to show that the additional height is required to provide a more efficient coverage pattern. The applicant has provided information illustrating the existing coverage gap in the localized area and how the tower would fill that gap. 2) The municipal code requires that only facilities that are totally enclosed within a permitted building shall be allowed within two hundred percent of the fall zone of the facility to any existing residential district within the City. The fall zone is considered to be equivalent to the maximum height of the tower. In this case, the nearest residence is more than 200 feet from the tower site, well over the required distance. 2 ENVIRONMENTAL REVIEW
An initial study prepared for this project concludes that the project will not have a significant impact on the environment and a draft negative declaration has been prepared reflecting this.

ALTERNATIVE ACTIONS

1. Determine that the findings for the Negative Declaration, Conditional Use Permit and Variance can be made, and motion to adopt Negative Declaration #2021-02 and approve Conditional Use Permit #2020-03 subject to the conditions recommended in the staff report.

2. Determine that the findings for the Negative Declaration, Conditional Use Permit and /ariance can be made, and motion to adopt Negative Declaration #2021-02 anc approve Conditional Use Permit #2020-03 subject to the conditions recommended ir the staff report with changes/revisions as may be submitted by the Commission.

3. Determine that the findings for the Negative Declaration, Conditional Use Permit cannot be made and deny Conditional Use Permit #2020-03.

FINDINGS
To adopt the Negative Declaration, the Planning Commission must find the following:

1. The project will not have a significant adverse effect on water or air quality or increase noise levels;

2. The project will not have a significant adverse impact on the flora and fauna of the area;

3. The project will not degrade the aesthetic quality of the area;

4. The project will not have a significant adverse impact on traffic or land use;

5. In addition, the project will not:
a. Create impacts which have the potential to degrade the quality of the environment;
b. Create impacts which achieve short-term to the disadvantage of long term environmental goals;
c. Create impacts for a project which are individually limited, but cumulatively considerable;
d. Create environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly;
3 6. The Negative Declaration was prepared in compliance with CEQA and the CEQA Guidelines.

To approve the conditional use permit, the Planning Commission must find the following:

1. That the requested conditional use permit is consistent with the city general plan and the zoning code.

2. That the establishment, maintenance, or operation of the proposed use or structure will conform to the requirements and intent of the zoning code; and that such proposed use or structure will not, under the circumstances of the particular case or as conditioned, be injurious or detrimental to the health, safety, or general welfare of persons or property in the vicinity of the proposed use, or to the general welfare of the city.

RECOMMENDATION
If the Planning Commission feels that the findings can be made, staff recommends the following conditions:

1. That all conditions of approval shall be printed on corrected plans submitted for permits. The plans shall incorporate all changes resulting from these conditions of approval.

2. All construction shall be subject to the California Building Code and other applicable construction codes as adopted by the City of Patterson.

3. Vehicle access shall be, at a minimum, an all-weather driveway capable of accommodating emergency vehicles, and shall be maintained so that adequate site drainage is maintained, and no mud or silt is carried onto public streets.

4. That the project shall be subject to an encroachment permit.

5. All internal combustion engine driven equipment, including construction equipment and permanently installed power generation equipment, shall be properly maintained and tuned in accordance with manufacturer's specifications Idling of all internal combustion engine powered equipment should be limited to ten minutes at any given time.

6. Any signal interference with the City's SCADA automated system must be resolved at the expense of the current tower operator.

7. The project applicants shall provide on-air RF studies, within 60 days of activian and telete site wari on tetire ent any oat signboth ECOM

8. All building utilities shall be underground at the point where they enter the equipment shelter.
4 9. Project grading shall not interfere with the natural flow or adjacent lot drainage, and shall not adversely impact downstream properties. Grading plans shall indicate the amount of cut and fill required for the project, including any necessary retaining walls.

10. The project shall be properly maintained in terms of dust accumulation and chipped and/or faded paint, etc.

11. That any on-site illumination shall not be excessive and shall be directed into the site.

12. That the lessee and/or operator of the tower site shall provide a minimum of 30 days' notice of proposed non-operation or abandonment of improvements at the site. Tower, antennas, and all support equipment shall be removed from the site within 90 days of such abandonment.

13. That a Construction Waste Management Plan shall be submitted to the Public Works Department for review and approval.

14. That a 2A: 10B:C or larger fire extinguisher shall be installed at locations as specified by the Fire Chief or his/her designated representative.

15. All disturbed areas, including storage piles, which are not being actively utilized for construction purposes, shall be effectively stabilized of dust emissions using water, chemical stabilizer/suppressant, covered with a tarp or other suitable cover or vegetative ground cover.

16. All on-site unpaved roads and off-site unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant.

17. All land clearing, grubbing, scraping, excavation, land leveling, grading, cut & fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking.

18. With the demolition of buildings up to six stories in height, all exterior surfaces of' the building shall be wetted during demolition.

19. When materials are transported off-site, all material shall be covered, or effectively wetted to limit visible dust emissions, and at least six inches of freeboard space from the top of the container shall be maintained

20. All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited except where preceded or accompanied by sufficient wetting to limit the visible dust emissions.) (Use of blower devices is expressly forbidden.)

21. Following the addition of materials to, or the removal of materials from, the surface of outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient chemical
stabilizer/suppressant.

22. Within urban areas, track-out (earth material deposited on City streets by construction equipment) shall be immediately removed when it extends from the site and at the end of each workday.

23. Any site shall prevent carryout and track-out.

24. Limit traffic speeds on unpaved roads to 15 mph;

25. Install sandbags or other erosion control measures to prevent silt runoff to public roadways from sites with a slope greater than one percent.

26. Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving the site;

27. Install wind breaks at windward side(s) of construction areas;

28. Suspend excavation and grading activity when winds exceed 20 mph;

29. Limit area subject to excavation, grading, and other construction activity at uny one time. Regardless of wind speed, an owner/operator must compl vith Regulation VIII's 20 percent opacity limitation

30. Project shall install a Knox Key Box as required by the Fire Department.

31. That the project shall comply with all applicable State and Municipal Codes, and meet the requirements of the Public Works Director, City Engineer, Building Official, Community Development Director, and Fire Chief.

32. That the applicant shall indemnify, defend, and hold harmless the City of Patterson, its agents, officers, and employees from any and all claims, actions, or proceedings against the City of Patterson, its agents, officers and employees to attack, set aside, void, or annul, any approval by the City of Patterson and its advisory agency, appeal board, or legislative body concerning the project, which action is brought within the time period provided for by the Government Code of the State of California. The City of Patterson shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. If the City fails to do so, the applicant shall not thereafter be responsible to defend, indemnify or hold the City harmless.
6 submitted,
Joel Andrews
City Planner
Attachments
Project plans
Draft Negative Declaration
Initial Study
Environmental Noise Assessment
Radio Frequency - Electromagnetic Energy (RF-EME) Compliance Report Coverage maps
Applicant Support Statement
TID letter
Stanislaus County Department of Environmental Resources letter Regional Water Quality Control Board letter
Public Notice
7 • 301 300
15401
JAMES BURKE AVE 15349
FT 298
250
1110
FT270
246
243
242
239 15421

RED ROBIN DR
Solar
235 236 M
31619 AB 100
231
234 WARD AVE
T4954
227
230

NEW DISTRICT DESIGNED FACILITIES
223 TO BE INSTALLED TO SERVE THE CELL
SITE
226
Solar
801
222
T2766
218
1025
Source: Esri, Maxar, GeoEye. Earthstar Geographics. CA
SITE NUMBER: CVL01687 CVL01687
PATTERSON 2-

CITY OF
SITE NAME: PATTERSON 2 - CITY OF PATTERSON
15421 NORTH 9TI| STREEt
PATTERSON PATTERSON, CA 25363

PREPARED FOR
at&t at&t
15421 NORTH 9TH STREET
PATTERSON, CA 95363
JURISDICTION: CITY OF PATTERSON
APN: 048-048-010
FA CODE: 14758136
USID#: 294157
PACE#: MRSFR065960 SITE TYPE: PREMANUFACTURED WALK-IN

CABINET / BELL TOWER
COmPLETE
Wireless Consulting, Inc.

PROJECT DESCRIPTION PROJECT INFORMATION PROJECT TEAM SHEET INDEX = nic cure: 18111+7
PAPEDY BEADMATON PROPERTY OWNER: APPUCANT / LESSEE: ARCHITECT ENGINEER:

SIE PLANE PATEPSON 2 -CHY OF - No GN-I GENERAL NOTES, ABBREVIATIONS & LEGEND 162 2753
ERY/S POWER /IFICO / FIRER TO SEE LOCATION GN-4 PHOTO SIMULATIONS C-1
• HEADED TORE CORINGTURED WAL NEARIET OVERALL SITE PLAN

SIT ADORESS ENLARGED SITE PLAN
CONSTRUCTION MANGER: A-21 EQUIPMENT AREA PLAN
SITE ACQUISITION: A-3.1 ANTENNA PLAN, SCHEDULE. & DETAILS •PORTED AREAS ASSOCIANEO ONCUADIO
ENCRANEIRO CA 95018 PROPOSED ELEVATIONS

ARE CRE ASHENNA CURRENT TORING ACCO CAME
A 82

URSDICIION ERY CE PATTERSCHI TID POWER DESIGN

POWER SINGLE LINE DIAGRAM

LATRUCE ANAR NADAS
LONGRE W0121°05 2504 rADA
CADUNO ELEVATION 112/1 AM5L 305/03/21 100% 20 REV2
1O0N TO RIVI
5: 159 54591 cm 10/06/20 1001,70

CODE COMPLIANCE VICINITY MAP
SURVEYOR:

I TOO CALFOREA LETHICAL COCE DIRECTIONS FROM AT&T
• SOLO CALFORM MECHANICA CODE F0V1103 STE
DIO CANOPIN PLUMANIE CODE DIPECIONS FROM A181 OFFICE AT 2600 CARENO RAMON SAN RAMON CA MERGE ONCE 1880 SOUFROM BOILIGER CANTON FOND
* are Carcene not 500E

A PIO CAR PEECE SIANDAROS CODE

TURRET CINO WESE LAS PALMAS AVERAG

PATTERSON, CA CUPIED CRO WARS AVINE

SUPERCH GIOSE ACCESS POND

MST ARCHITECTS

APPROVALS

OCCUPANCY AND CONSTRUCTION TYPE TITLE SHEET

GENERAL CONTRACIOR NOTES DIGALERT

OCCUPAY FURIOSCURED TELECOMMUTICATIONS FACITY) DO NOT SCALE DRAWINGS CORRIE ONE V9
ACCESS BILITY RE QUREMENTS T-1
800-227-2600

ABBREVIATIONS
GENERAL CONSTRUCTION NOTES: CVL01687
PATTERSON 2-

LESUENE , MENURE MANE BAD MBOR CES AE TE Y RAMESE ALE S ALAION AS NE AE ONTE DRAINSNG MATERIAIS CITY OF

PATTERSON
HE CONACIOR SHALL OSTAIN IN WRING, AUTORAION TO PROCEED BEFORE SARTING WORK ON ANY ITEM NOT CUCAR! Y DEFINED DO IRENIT ED AY THE CONIRAC- DOCUMENIS C2 NORI9HS1RE3
PASTERSON. CA 95363
) CONIRACICR SHALI CONTACIUSA TUNDERGROUD SERVICE ALERT: AT (800) 221 2600, FOR UMITY LOCAIIONS, 1S HOURS BEFORE

PREPARED SOR
* IECOCAAEOENED ORE SE O EE LOCA CODES OR AGUAOIS ANEPREACEURESS PECONMENDATONIS UNESS alli at&t
3 A0 ONED O PSG IGR NAUR, CENE GRD, MERC PAR OS AND MICHAEAI EOUHENU ALE WOEI MASI COMPY MELEPAI SAPIHAARE COMEAND PEGUl ANOS
10 9
" INORY, OF AS OTHARISE SIULATED EN TRE CODE EN ORCEMEN OFRE AL AVNG JURSDCION RIR TO THE COMMENC EMENTOF

ADO NOTEXCAVATE OR DISTURB BEYOND THE PROPERTY LINES OR LEASE LINES, UNLESS OIHERWSE NOTEU COMPLETE Niroloss Consulting. Inc.
162.2753

CHECHEO B
' EVAISNSP ECE O NA ASPECN O NRE AND M AREAS TO BE OSTURED BY COUISIEUCTON SHAL AE ADJUSICO IO FRASH 12 ASY DRAI AND/OR FIELD TILE ENCOUNIERED / DISIURBED DURNIG CONSIRUCTION SHALL BE RFIURNED TO ITS ORIGITIAL CONDHION

ADA PS DEWADE SUE BRATON ANA IYPEAE ANY LINREOCOOUNS URUHES OR WPROVMENIS CHALLBE ACCURAIEL

DO RO GRACID ON AS BULT DRAVINGS BY GENERAL COVIRACTOR, AND SSUED IO SHE ARCHIECI/ ENGRECR AI COMPIETOTI 1 AC COREANCE WIT CORRECT OCCUFAINAL SATEY AND HEALTH DAMISIA IO (OSA) REURENEY AID BACP OP BRACEDN MEDSvs 05/03/21| 100% ED REV2
03/16/21| 1007 20 /TV1
1A INICLUDE MISC.ITEMS PER AT&T SPECIFICNIONS 10/06/20100%70 69/16/29 605 10

SYMBOLS LEGEND
APPLICABLE CODES, REGULATIONS AND STANDARDS:

AUTISBIT AUTES URESDICION (ANITÉOR TE LOGATIGASIE NAIONAL. SIAIE AND LOGAI COOES AS ADORED BY HE LOCAI 1 WItICION

E DETON OET ADPED CODES AND SANDARDS EESTE ON THE DATE OF CONIRACI AWARD SHALI GOVERN THE DESICN, DIZEE GRAVE:

SURCONIRACIOR S WORY SHAIL COMPLY WTH THE I AIEST EDITION OF THE FOLLOWNG STANDARDS 0 sr6
mao cora cine

MAASTRNCI CO MST ARCHITECIS
IGUOAE NEONG SISIEM (RES PHISE PROICNNC REGUREMENIS FOR TLECOMMUCAIO TEICORRAA GR 63 MEINOPY FICORNACR3L7 CENIPAL OFFICE POWER WIRNG
CODOIA C.R12S GENERAL INSIALLATION REOUIREMENIS

REVANSH BATUM
ANE AND ALL OTHER LOCAL & STAIE LAWS AND REGULATIONS GENERAL NOTES.

ABBREVIATIONS, &
LEGEND

P DC SURCE SUPAESMOTI
saurpau

WAIL TIPE MAPA
GN-1
IS toUrVEN
CVL01687
PATTERSON 2 -

CITY OF

PATTERSON
B30S11.6H.8ON 1695
PATERSON, CA 95363
at&t
Existing Existing Existing

COMPLETE
1622753
Proposed Proposed
Proposed
03/16/21 100% 70 FEV
0/08/731005:20
39/16/20 105.70
yet These Solestellar
ACT Wirolene 2 ATET Wireless

MST ARCHITECTS
PHOTO

SIMULATIONS
GN-4
DATE OF SURVEY 03-26-20

BARTO FOR UNICE DRECIN OF KENNETH O

READO I THE COUNTY OF STANSAUS, STATE OF APPROVED

VERSAY TABC AN
ECT
NEVA CORRECTION, SUBTRACT 245 FROM
0A4E0 05-F6-20 2OIE X PER FEW 06087C0J87E, EN ENGINEERING CONTOUR INTERNAL: NA
ISSESSOR'S PARCEL NUVOIR 018-048-010

LANDLORES) CITY OF PATTERSON

VICINITY MAP
tate at Outerratien 03-26-20
Type ol talenna Mount Proposed Light Standerd
Cecrérales
Longise W 120005 (4063) 377002128(027
Loside W 1214026(483) 12153214(A023)
at&t MOBILITY
(LEVATION or Creand of Struciure (NAVORA) 15Y AUC
APN 048-040-010
AVENUE
APN 048-048-010
CA 95383
049-245-001 CVL01687 Patterson 15421 N, 9th Street PLOT PLAN AND SITE TOPOGRAPHY

SEE LEASE

AREA DETAIL

WARD AVENUE
(E) RESCENCE APN 048-018-001
SCALE 1" = 20'
SCALE 1"

OVERALL PROJECT AREA LEASE AREA DETAIL
A-1.1 OVERALL SITE PLAN 2 OVERALL SITE PLAN

UNLITY EASEMENT
PLAN

OVERALL SITE
SHEET FIF W. LAS PALMAS AVENUE EXISTING IT EASEMENT PER MST ARCHITECTS PROPOSED Se x102" PULLBOX -

EXUTES PO O WDERIGHT OF WAY- CONDITWED DO UCTION BOX
1O PROPERTY LINE INSTALL POWER MARKER

PROPOSED UNDERGROUND CONCUT SOUTH EXISTING INCO GROUND VAULT FEED - PAVEMENT
PROPOSED AIAT UNDERGROUND nEER]
Dea 048.001

CONDUIT STUB

XOTING CONCRETE SIDEWALK-
011120107511
0/50/20 1005.30
EXISTING I00 WE RIGHT OF WAY-
200/00/21100% 2D REV 2
3 10/04/21 100% 2D REV 3|

WARD AVENUE
162 2753
PROPOSEO VIVER (8SO5P-
048-048-010
APN:

Wireless Consulting, Ine

COMPLETE
at&t
049048 008

PREPARED TOR
PATERSON, CA 95363
15421 NORTH 9TH STREET

PATTERSON

CITY OF
PATTERSON 2-
CVL01687 THIS IS NOT A SITE SURVEY

ENLARGED SEE PLAN
A-1.2

PLAN LING INSIALL POWER MARKER ON

ENLARGED SITE CONDU SOUTH TO PROPERTY
uttity EASEMENT PER 52/PM/06
stain in Not Bal
comradelane 19815 ARE WAL NO A CONS FUTURE CURD BY OTHERS ATIVORNATIDCATON DE.

MST APCHITECIS

HUNY SACEMENT

DOSING RR GATION RISER MAN EXCITE ACCRA
PROPOSED 11210mbE
FIBER (1290-3)

PROPOSED AAT UNDERGROUND

AREA PLAN
ACES A LET EASE ENTE - 3313 -
29/10/20 90510
1008 20 R00 03/18/21 WARD AVENUE
05/03/21100% 10 REV 2

MATA TAKEN SARDANDY

ORVEWAY APPROACH PER

DALAN AT ARNADOE
160.2/53
CVL01687
Wireless Consulting. Inc

COMPLETE
at&t

PREPARED FOR
PATIERSON. CA 95363)
15421 NORTH 91H SIREET

PATTERSON

CITY OF
PATTERSON 2 -
CVL01687
30 O PACHOSED AIKE LEASE ANEA
CVL01687
LE CONCRETE SIDOR 3.6 PATTERSON 2-

DONE TED E CUST AT
5 D OENERAID S(A8 OPOSED ATE CAM LOR GERATOR INTERFACE CITY OF

MOUNIED OUTSIDE OF CONCIE WALKIE CABINET

PATTERSON
0010 ASSI PROPOSED ATA1 30 CIRCUIT LOAD CENTER
GY WITH CHIA ROX ARGUE MOUNTED ON A AND AUIOMATIC TRANSFER SWITCH MOUNTED 421 NORINOIS REE UTILITY II FPAME 121-1/2O MAC FOR OF FOWER IG ION ON PROPOSED CONCRETE STOOP QUISIDE OF CONCRETE WALE IN CADINE: PATERSON CA 95363

TO MISO ALISO

SHE ATOR ALARMY DEPORT ALI POINED PIANI
ROPOSED AT&I 200A SERVICE NETER PROPOSCO A1811 4%8 I CON CPETE SICON

MOUNTED ON A UTTY H FRAME
WITH • O DEEP CONCRETE SIER

PROPOSED AT&I MY BPID/FIF RACY
at&t

INSTALL IN WIATMRPROOF CABINET & LABEL

MEDIOSED AILT GAS ANTENNA

DON ATE USE AT

MONIES TERSECURINGHIS

LE SPONT ANS RACY OF CONCRETE

WAIT A CARDEE

PROPOSED AT&T IVAC UNT MOUNTED

MISIDE CONCOLTE WALK RIGASPIES
trit
ROPOSED ATA: 6 O TALL CAN COMPLETE
WALE A 12 O WIX CORFUDAITO C WALCASTA
Wireless Consulting, Inc.

AN 8C29.0 CONCRFIE SLAS

NOND ATLE ICO PACE

ANGUMED ON A BAD O CONCEI SIAS

CHEC-(DA-

PROPOSED AIRT ICE BROCE

LO GENERAJON HAZ
• PROPOSED CABIE PORI
05/03/21100170HPV3
03116/211001155V
108/20 100220

PROPORD AT&T BELL TOWER

POROSIO MINE N TAN TASTAREA
AEL LOWER 3.0' WDE ACCESS COGS.

MSTARCKITECIS

EQUIPMENT

AREA PLAN
1S0 SLOWE

DO PROPOSED AVAT LEASE AREA
A-2.1

RF SCHEDULE
MERIDIOT COAXIENGIH XIM EIVE PRU NO CVL01687
• 78-0 1) 4449 85/812 / 10; 8849 27/5544 • 020 PATTERSON 2- BASE CLIPA 41P CUBA 1 11.247881e / 111 68438222034 • 91-0 CITY OF • 24-0 11193US 9SUS E232° 2415830 94.0
762185: PATTERSON
Product Specifications COMMSCOPE
15421 NORTH 91I1 SIRECT
CCI IPA 458 RUBAN Y 01 228985/812 1 10) 8843 82/8564 PATTERSON, CA 95363) 270° (1) 22789147(1) 6343 82/3604
• 74 0 PREPAREO TOD
• 74 2 114249 85/812/118 6843 821844A at&t
CCI PA 159 KUBAA F : 14-0 1! 4478 814 / 18: 8543 B2/8-64 CCI TPA 158 rUBAA Y • 74-0 1gRRUS BRUS E2829/ (0) 1415 830 1) 4249 35/312 / (1) 8843 B2/486A

GALVANZED PIPE MOUNT
TO T TA C 24 2 10) PELS 62829/10 4815830
RE DATA SMEET V2 00 DATED 09/30/2020 HOI: ANTENNA POSTIONS ARE LEFT TO RIGHT FROMFROM OF ARIENNA COUPLIT IS PRELINARY MID SUBECT TO CHANGE

RF SCHEDULE COMPLETE
A Wireless Consulting, Inc.

PRAY TINERTO ANTENNIAC LOWED A GAGI
24) PROPOSED AIDI ERHS,

AS PER SECTOR VERICALLY
4 DC SURGE SUPPRESSION (SQUID) 15o instante TACTED ON ARH RACKS Faul ACTE hawaiiiinaus
Product Specifications COMMSCOPE | 05/03/21 ICOT ID VIVE 3/15/21 101 TD HIVI
TỒM

ANINIA -
MATEORM • ANSENNA I RUE
ACCESS MAICH • ANTENNA LEVEL -

MST ARCHITECIS
- Convin sinis

SENORTH ANTENNA PLAN,
RONT
SCHEDULE. &

DETAILS
A-3.1
3 PROPOSED ANIENNA SPEC ANTENNA LAYOUT PLAN

PROPOSED MW DISH SPEC
CVL01687
NOTE 121 24 PAIR FREO IRUNTS PATTERSON 2-

OWER TO ANTENNAS ABOVE CITY OF
гОЛОЛО F00I

BOTTOM OFFOO PATTERSON
5421 NORTH 9TH STREET
PATTERSON, CA 95363

CENTER DE ON PROPOND AIST ANTONLAS

CONLONE OF PROPOSED AIRT ANTENNAS
320. at&t

BOTTOMOE PROPOSED ATE ANTENNAS
CUTION OF PROPOSED ATE ANTENNAS 12-0 499 ACL
- ERP (OUVERS
@ COTTON OF TALL CREDIC
80 TRP: CUVERS -
801

EATION LEVATION O
S80AOL

COMPLETE

OR OF PROPOSED ATTAIN DISN STRACT

CENTERUINE OF PROPOSED AIST AN DISP
CENTER INE OF PROPOSED ATAT MN OD»

BOTIOM OF PROPOSED AI&I ARY DISH BOTTOM OF PROPOSED ATAL DON DE 260

INCE TO REV
10/09/20 1003,20
09/16/2090%10
• PROPOSEO A1&T IOWER PROPOSED ATAT 8 0 48 0°
/annie waiy.a.

PADINCTIANAACTA
- STUCCO EXTERIOR ONCOMIERA,

A FRANE
PROPOSED AT&I GPS.

ANTENNA

AND OWN INTED LED

PROPOSID ATRI GENERAC SECURIY LICHIIS AL FRONT

AND BACK OF CONCRETE

WALK IN CARNE

VICH A ISO GALLON FUEL MST ARCHITECIS

PROPOSE AT GPS ANTENNA PROPOSED ATAT HOODED PROPOSED AT&T TOWER ACCESS DOOR na 2 SHEET TIN =

PROPOSED

TOP OF PROPOSED CONCRETE STOCH ELEVATIONS
00 AGENTS AIRSIT
PROPOKD. A-4.1

ATAS FION BOX

NORTHWEST ELEVATION SOUTHWEST ELEVATION
CVL01687
PATTERSON 2.
1 112) DC POWER TRUNKS INSO: CITY OF

PATTERSON
1O% OF PROPOSED ATAT ANTENNAS 15421 NORTH 9TH SIREFI
PATTERSON. CA 25363]

CENTERLINE OF PROPOSED AIST AMIRIAS SPAREDICI
at&t

BOTSAO WOOND ALI ATE
Has Casta tamel
ton Rames Colonio 14993
ВИТО МАІСИ

HOP OF HOPORD AMALANDS D COMPLETE
Wireless Consulting. Inc.

CENTERUINE OF PROTOSED ATAT MAN OSH O

BOTTOM GE PROPOSED ARE AN EA

POTIOM OF PROPOSE MISTAN DOIL
15 2309
300 ACT. RP FRAMNG/CONSTRUGHON
FUTURE MACROWAVE LOCATION. FUTURE MICROWAVE LOCATION

INISH TO MAICH
10/04/21| 100% /0 REV3
06/00021100% 20 REV 2
AUNT TONE 2O REV I
0N/10/200/0

STUCCO EXTERIOR

STUCCO EXTERIOR
•PROPOSED AT&T TOWER

PROPOSED AT&T TOWER -
• PROPOSED ATAT ICE BROGE
PROPOSED ATAL 0X8 D CONCRETE WALK IN
8 058 0 CONCRETE SLAS
CONVENTONA, FRAMING/CONTRACTON PROPOSED AIL! CAS ANTENDIA

LED SECURITY CHIS AT FRONTAND BACK OP

MST APCHITECIS
PROPOSED AT&T 6 D TALI CAN
NAL &12 WIDE CORRUGATED
USTAL ACCESS GA1E

PROPOSED

ELEVATIONS

TOR GI PROPOSED CONCRET SOO O

DIATNO COADE
-DE AGE D920 AMISIO
NORTHEAST ELEVATION A-4.2

SOUTHEAST ELEVATION

CITY OF PATTERSON

COMMUNITY DEVELOPMENT DEPARTMENT
PO BOX 667, PATTERSON, CALIFORNIA 95363
(209) 895-8020, FAX (209) 895-8019

PROPOSED

NEGATIVE DECLARATION
A notice, pursuant to the California Environmental Quality Act of 1970, as amended (Public Resources Code 21,000, et. seq.) that the project for AT&T Wireless Tower - Centennial Park which, when implemented, will not have a significant impact on the environment.

PROJECT TITLE: AT&T Wireless Tower - Centennial Park
PROJECT LOCATION: APN 048-048-010, East side of Ward Avenue, approximately 500 feet north of the intersection with West Las Palmas Avenue, City of Patterson, County of Stanislaus DESCRIPTION OF PROJECT: The construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, an 8'x8' pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in High Density Residential Zone, on a site approved for a park.

FINDINGS AND BASIS FOR A NEGATIVE DECLARATION:

The project will not adversely allect water or air quality or increase noise levels; The project will not have adverse impacts on the flora and fauna of the area;

3. The project will not degrade the aesthetic quality of the area;

4. The project will not have adverse impacts on traffic or land use;

5. In addition, the project will not:

Create impacts which have the potential to degrade the quality of the environment; either directly or indirectly;
The City of Patterson has, therefore, determined that the potential environmental impact of the project is insignificant.

MITIGATION MEASURES INCLUDED IN THE PROJECT, IF ANY, TO AVOID POTENTIALLY SIGNIFICANT EFFECTS:

INITIAL STUDY: The City of Patterson Community Development Department has reviewed the Posinian. A cental the initial this project and has found that the probable impacts are potentially REVIEW PERIOD: November 18, 2021 through December 20, 2021 All comments regarding correctness, completeness, or adequacy of this Negative Declaration must be received by the City of Patterson Community Development Department, PO Box 667, Patterson, CA 95363 or at (209) 895-8020, no later than 5:00 p.m. on December 20, 2021.

DATE: November 18, 202l SIGNATURE:

Joel Andrews, City Planner
Phone: (209) 895-8020 Fax: (209) 895-8019

CITY OF PATTERSON
Initial Study of Environmental Impact
I. Summary of Findings
Project Name:

Project Description:

Sources:
implementation of CEQA.

Applicant: City of Patterson, 1 Plaza, PO Box 667, Patterson, CA 95363 Recommendation: Negative Declaration
Location: East side of Ward Avenue, approximately 500 feet north of the intersection with West Las Palmas Avenue, Patterson, CA 95363 - Assessor Parcel Number 048- 048-010
Date: November 18, 2021
II. Project Description
The project assessed by this initial study considers the construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, an 8'x8 pre- cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in High Density Residential Zone, on a site approved for a community park.

Environmental Setting
The project site is generally vacant and is part of an undeveloped section of the Centennial Park project, a joint project between the City of Patterson and the Patterson Joint Unified School District. The Centennial Park plan includes a future community center, an under-construction, school district performing arts theater, and various other outdoor recreation uses. Development bordering the site includes single family housing to the west, the Patterson Community Complex to the southwest, and generally vacant land, with some residences located to the north, east, and south. See Figure 1. No off-site work is planned. See Figure 2.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 1 Figure 1 - Project Location
tterson-Puerto Hig
Ward Ave
Nothist
Noth St
Ward Ave
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 2 Figure 2 - Project Site
013003 00-
NORTH 9TH AVENUE

INCARCEO PLANE

WARD AVENUE
EATING I00 O WIDE RIGHT OF WAT

NANA CONSUMALS
045-049001

I FRESPRED STE PLAN

BRING IN IT WOE RIGHT OF WAI
- EXISTING UTILITY POLE WI TRANSFORMER
W. LAS PALMAS AVENUE
EXISTING TA CO PEDESTA:

L SITE PLAN

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT Figure 3 - Enlarged Project Area
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 4 III. Initial Study Environmental Checklist
This section discusses potential environmental impacts associated with approval of the proposed project.

The following guidance, adapted from Appendix I of the State CEQA Guidelines, was followed in answering the checklist questions:

1. A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the discussion. A "No Impact" answer is adequately supported if the discussion shows that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained when it is based on project-specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis).

2. All answers must take account of the whole action involved, including offsite as well as onsite, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.

3. All analyses must be based on a comparison between conditions that would occur if the project were implemented and existing conditions (also known as baseline conditions).

4. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect is significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required.

5. "Potentially Significant unless Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less-Than-Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less-than-significant level (mitigation measures from earlier analyses may be cross-referenced).

6. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration (State CEQA Guidelines Section 15063|c|[D]). Earlier analyses are discussed in the project description above under "Previous Environmental Documents and Site-Specific Information".

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 5 The discussion that follows each section of checklist questions:
analyzes previously certified environmental analysis and/or mitigation relevant to the issue, including the potential for each effect to be significant and adverse and standard requirements and measures that will preclude adverse impacts; • describes proposed measures that will preclude adverse impacts; • analyzes the potential for residual or remaining significant adverse impacts following implementation of the project and all previously identified, standard, and proposed requirements and measures; and
• summarizes the applicable mitigation measures established by the various support documents and project-specific measures that will reduce the impacts to a less-than- significant level.

Identification of the potential for residual significant adverse environmental impacts would trigger the need for preparation of an EIR. For issue areas in which no significant adverse impact would result or impacts would be reduced to a less-than-significant level by mitigation, further analysis is not required.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 6 I. LAND USE AND PLANNING
Potentially Less-Than- No
Significant Significant | Impact
unless Impact
Mitigation
Issues Incorporated
Would the proposal:
a. Conflict with general plan designation or zoning?
•
So ice adopted by aliases wit pristition over
Cret incipalile with existing land us in the
d. Affect agricultural resources or operations (e.g., • impacts on soils or farmlands, or impacts from
incompatible land uses)?
e. Disrupt or divide the physical arrangement of an
established community (including a low-income or
minority community)?
Setting/
The project consists of a wireless communication facility consisting of an 84.9' tower and associated equipment within the High Density Residential General Plan District and the High Density Residential Zone.

Discussion
a,c. "Communication and Equipment Buildings" are permitted with a conditional use permit in the High Density Residential Zone. The municipal code allows communication equipment to reach a maximum height of 60' in the High Density Residential Zone, however, does allow the Planning Commission to approve an exception where additional height above the maximum may be approved, provided that the applicant provides information demonstrating that the increased height is necessary for a more efficient development and coverage pattern. In this instance, the applicant is requesting an exception to allow the additional 24.9' in height with information showing that the increased height adequately serves coverage gaps in the City of Patterson. The code also includes provisions related to minimum distances for towers from residences and residential zones. The project is located at least 180 feet from the nearest existing residence, sufficiently distant to meet required "fall distance" criteria and, while the project is located in the high density residential zone, the City has purchased the land and the City Council has approved the Centennial Park plan for the entire site, effectively removing any potential for residential development in the immediate area.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 7 The project has been designed with the look of a decorative bell tower, both to screen the cell tower use and to blend in with the surrounding development contemplated as part of the Centennial Park project.

Conclusion
The proposed project is not anticipated to significantly impact agricultural land or land use compatibility.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 8 II. POPULATION AND HOUSING
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigatio
Incorporated
Would the proposal:
a. Cumulatively exceed official regional or local
population projections?
b. Induce substantial growth in an area either
directly or indirectly (e.g., through projects in an
undeveloped area or extension of major
infrastructure)?
Fan Displace exting housing, especialy affordabile
Setting/Discussion
The project consists of wireless communication equipment in an undeveloped area. No impact to population or housing is anticipated.

Conclusion
The project will not have an impact on housing or population.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 9 III. GEOLOGIC HAZARDS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact
Incorporated
Would the proposal result in or expose people to potential •
D. Seismic ground shaking?
- Some susand lure and ning laudacion. •
Landslides or mudflows? •
f. Erosion, changes in topography or unstable soil
conditions from excavation, grading, or fill?
g. Subsidence of the land? •
Expansive soils? •
Unique geologic or physical features?
Setting
The area is within a zone of low seismic activity. All impacts have been addressed in the General Plan EIR. No significant soils effects or geological problems are expected which cannot be addressed through the use of current engineering standards adopted by the City and State.

Discussion
f.,h. Grading and excavation required to implement install equipment related to the project create the possibility of unstable soil conditions. However, no significant soils effects or geological problems are expected which can not be addressed through the use of current engineering standards adopted by the City and State.

Conclusion
The project will not result in impacts relating to geologic hazards considered to be significant.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 10 IV. DRAINAGE AND WATER SUPPLY
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact
Mitigation
Incorporated
Would the proposal result in:
a. Changes in absorption rates, drainage patterns, or • the rate and amount of surface runoff?
b. Exposure of people or property to water-related •
hazards such as flooding?
c. Discharge into surface waters or other alteration of surface water quality (e.g., temperature, dissolved
oxygen or turbidity)?
d. Changes in the amount of surface water in any water
body?
e. Changes in currents, or the course or direction of
water movements?
Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations or
through substantial loss of groundwater recharge
capability?
g. Alteration to the direction or rate of flow of
groundwater?
h. Impacts on groundwater quality?
Substantial reduction in the amount of groundwater
otherwise available for public water supplies?
Setting/ Discussion
Construction of the project would not have an effect on procurement, distribution or quality of drinking water.

Conclusion
The project is not expected to result in significant impacts relating to drainage and water quality or quantity.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 11 V. AIR QUALITY
Issues Potentially Potentially Less-Than- No
Significant Impact
simpact significant unless Impact
Mitigation
Incorporated
Would the proposal:
faiting or protected ali ain and of contribute to an
•
• Alert movement, porter at umperature, or •
ause any change in climate?
•
Setting
Currently, the San Joaquin Valley Air Basin is classified as a "Severe non-attainment" area for both the federal and State standards for ozone and a "serious" non-attainment area for the federal standard for respirable particulate matter (PMro, or particles 10 microns or smaller in diameter). Emissions of these air pollutants, and their precursors, will increase as a result of motor vehicle trips generated by the project, and from grading and onstruction operations. Together, these activities may hinder efforts to achieve an‹ maintain air quality standards established by federal and State laws.

Discussion
a. Development of the project site will result in short-term air pollutant emissions and dust generation from construction activities. Such activities will generate short-term fugitive dust and vehicle exhaust emissions as a result of excavation, grading, and construction- related vehicle trips.

Construction Emissions
A project's construction phase produces many types of emissions, but PM-10 is the pollutant of greatest concern. PM-10 emissions can result from a variety of construction activities, including excavation, grading, demolition, vehicle travel on paved and unpaved surfaces, and vehicle exhaust. Construction-related emissions can cause substantial increases in localized concentrations of PM-10, as well as affecting PM-10 compliance with ambient air quality standards on a regional basis. Particulate emissions from construction activities can lead to adverse health effects as well as nuisance concerns such as reduced visibility and soiling of exposed surfaces.

The SJVUAPCD's approach to CEQA analyses of construction impacts is to require implementation of effective and comprehensive control measures rather than to require CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 12 detailed quantification of emissions. PM-10 emitted during construction can vary greatly depending on the level of activity, the specific operations taking place, the equipment being operated, local soils, weather conditions, and other factors, making quantification difficult. Despite this variability in emissions, experience has shown that there are a number of feasible control measures that can be reasonably implemented to significantly reduce PM-10 emissions from construction. The SJVUAPCD has determined that compliance with Regulation VIII for all sites and implementation of all other control measures as appropriate, depending on the size and location of the project site will constitute sufficient mitigation to reduce PM-10 impacts to a level considered less-than- significant.

San Joaquin Valley Unified Air Pollution Control District air quality mitigation measures are already included as mitigations for all projects as standard procedure to address these issues. Additionally, appropriate policies are dealt with in the 2010 General Plan EIR:

The City shall require all of the following as a condition of project approval of future development projects:
• All disturbed areas, including storage piles, which are not being actively utilized for construction purposes, shall be effectively stabilized of dust emissions using water, chemical stabilizer/suppressant, covered with a tarp or other suitable cover or vegetative ground cover.
• All on-site unpaved roads and off-site unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant. • All land clearing, grubbing, scraping, excavation, land leveling, grading, cut & fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking.
• With the demolition of buildings up to six stories in height, all exterior surfaces of the building shall be wetted during demolition.
• When materials are transported off-site, all material shall be covered, or effectively wetted to limit visible dust emissions, and at least six inches of freeboard space from the top of the container shall be maintained.
• All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited except where preceded or accompanied by sufficient wetting to limit the visible dust emissions.) (Use of blower devices is expressly forbidden.) • Following the addition of materials to, or the removal of materials from, the surface of outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient water or chemical stabilizer/suppressant. • Within urban areas, track-out (earth material deposited on City streets by construction equipment) shall be immediately removed when it extends 50 or more feet from the site and at the end of each workday.
• Any site with 150 or more vehicle trips per day shall prevent carryout and track-out. • Limit traffic speeds on unpaved roads to 15 mph;
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 13 • Install sandbags or other erosion control measures to prevent silt runoff to public roadways from sites with a slope greater than one percent. • Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving the site;
• Install wind breaks at windward side(s) of construction areas; • Suspend excavation and grading activity when winds exceed 20 mph; and Limit area subject to excavation, grading, and other construction activity at any one time. Regardless of wind speed, an owner/operator must comply with Regulation VIII's 20 percent opacity limitation.
a. Impacts associated with the project are related to construction activities. Such impacts are temporary and have been addressed through the listed measures. As a result, no significant impact is anticipated.

Conclusion
The project will not result in significant impacts to air quality.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 14 VI. TRANSPORTATION/CIRCULATION
Issues Potentially Potentially Less-Than-
Significant Significant Significant Impact
Impact Impact
Would the proposal result in:

Increased vehicle trips or traffic congestion?
incompatible uses (eg., farm equipment)?
c. Inadequate emergency access or access to nearby •
uses?
d. Insufficient parking capacity onsite or offsite? •
•
Hazards or barriers for pedestrians or bicyclists? •
Conflicts with adopted policies supporting
alternative transportation (e.g., bus turnouts, bicycle racks)?
g. Rail, waterborne, or air traffic impacts?
Discussion
a. Construction of the project would incrementally add vehicle trips that are necessary to transport construction equipment, materials and personnel to the project site while the project is built.

Such impacts are not considered significant.

Conclusion
The project will not result in significant impacts to transportation or circulation systems.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 15 VII. BIOLOGICAL RESOURCES
Issues Potentially Potentially Less-Than- No
simificant Significant Simpaant impact
Mitigation
Incorporated
Would the proposal result in impacts on:
a. Endangered, threatened or rare species or their
habitats (including, but not limited to, plants, fish
insects, animals, and birds)?
b. Locally designated species (e.g., heritage
c. Locally designated natural communities (e.g.,
oak forest?
d. Wetland habitat (e.g., marsh, riparian, and
vernal pool)? •
e. Wildlife dispersal or migration corridors?
Setting/Discussion
Endangered, threatened, or rare species in the Patterson area include the San Joaquin Kit Fox (Vulpes macrotis mutica), Swainson's Hawk (Buteo swainsoni), Western Pond Turtle (Clemmys marmorata), and Burrowing Owl (Athene cunicularia). The San Joaquin Kit Fox's preferred habitat is grassland and rolling hills. Swainson's Hawk and Burrowing Owl both prefer grasslands.

The project is located on vacant land, previously used for agricultural purposes in an otherwise urbanized area. Potential impacts associated with biological resources were addressed in the 2010 General Plan EIR.

Conclusion
The project will not result in significant impacts to biological resources.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 16 VIII. ENERGY AND MINERAL RESOURCES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in:
a. Conflict with adopted energy conservation •
b. Use nonrenewable resources in a wasteful and
inefficient manner?
Discussion
The project will result in an incremental increase to the use of non-renewable energy sources.

Conclusion
The project would not result in a significant increase in the use of energy or mineral resources.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 17 IX. HAZARDS
Issues Potentially Potentially Less-Than- No
Significant Significant Impact
simicant unless Impact
Mitigation
Incorporated
Would the proposal involve:
hazardous substances (including, but not limited
o, oil, pesticides, chemicals, or radiation)?
. Possible interference with an emergency
- one elion ray eng chator potentia
health hazard?
d. Exposure of people to existing sources of
potential health hazards?
e. Increased fire hazard in areas with flammable
brush, grass, or trees?
Discussion
A Radio Frequency Electromagnetic Energy Compliance Report was prepared for the proposed project. The study determines potential exposure levels for the facility and compares that information to the Federal Communications Commission's Maximum Permissible Exposure Limits for both members of the public and those accessing the site for work related duties. The study determined that, under a worst case scenario, there is no modeled exposure for either occupational or the general public uses under FCC's limits.

The project is not expected to create or increase hazards.

Conclusion
The project will have a less than significant impact on health and safety.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 18 X. NOISE
Issues Potentially Less- No
Significant Than- Impact
unless Significan
Mitigation tImpact
Incorporated
Would the proposal result in:

Increases in existing noise levels?
D. Exposure of people to severe noise levels?
Setting
The Noise Element of the General Plan provides goals, policies, and implementation measures intended to reduce the adverse effects of noise. The Noise Element sets standards for the maximum allowable noise exposure from transportation sources as summarized on Table HS-3, below.

Table HS-3: Noise Level Performance Standards
For New Projects
Affected By Or Including Transportation Sources
Outdoor Activity Areas' Interior Spaces
Land Use dbLeq, Db?
Ldn/CNEL, DbLdn/CNEL,
Residential 60° 45
Transient Lodging 60° 45
Hospitals, Nursing Homes 603 45
Theaters, Auditoriums, Music Halls 35
Churches, Meeting Halls 603 40
Office Buildings 603 45
Schools, Libraries, Museums 45
Playgrounds, Neighborhood Parks 70
Where the location of outdoor activity areas is unknown, the exterior noise level standard shall be applied to the property line of the receiving land use.

As determined for a typical worst-case hour during periods of use. 3 Where it is not possible to reduce noise in outdoor activity areas to 60 Db Ldn/CNEL or less using a practical application of the best available noise reduction measures, an exterior noise level of up to 65 Db Ldn/CNEL may be allowed. provided that available exterior noise level reduction measures have been implemented and interior noise levels are in compliance with this table.

Noise is typically expressed in decibels (dB). The decibel scale is logarithmic because of the physical characteristics associated with noise transmission and reception. For example, a

3.0 decibel (dB) increase in noise levels normally results in a doubling of noise energy; however, because of the structure of the human auditory system, a 10-decibel increase is required to perceive a doubling of noise. A 1- to 2-decibel change in ambient noise levels is CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 19 generally not perceptible to the human ear. The A-weighted decibel (dBA) incorporates the human ear's sensitivity to sounds of different frequencies. On this scale, the sound level of normal talking is about 60 to 65 dBA.

Noise levels diminish (or attenuate) as distance from the source increases based on an inverse square rule, but the rate constant varies with the type of sound source. Sound from point sources, such as industrial facilities, attenuates at a rate of 6 dBA per doubling of distance. Heavily-traveled roads with few gaps in traffic behave as continuous line sources with an attenuation rate of 3 dBA per doubling of distance. Otherwise, roads typically have an attenuation rate of 4.5 dBA.

Construction work is the main source of noise as a result of the project.

A noise study was prepared for the project which reviewed predicted noise levels associated with operation of the facility. The study determined that the project's noise exposure would be less than the City's required noise generation maximum requirements.

No ongoing significant noise impacts are expected as a result of this project.

Discussion
a., b. Noise levels on the project site will increase as a result of construction activities associated with the project. Such noise is temporary and is not considered significant. Noise from the generator is not expected to exceed noise standards outlined in the 2010 General Plan EIR. No significant ongoing impacts are anticipated.

Conclusion
Noise levels resulting from construction and operation of the project have been addressed and can be mitigated per the 2010 General Plan EIR.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 20 XI. PUBLIC SERVICES
Issues Potentially Less-Than- No
Significant Impact
significant Impact
Mitigation
Incorporated
Following areas:

Fire protectior
Police protectio
Schools?
fa. Maice nancen pulsercie, induding roads) •
Other governmental services?
Setting/Discussion
The project is not expected to affect the need for services. The project would result in increased wireless communication coverage to the westside of the City of Patterson.

Conclusion
The project will not result in a significant impact on the need for and maintenance of public services.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 21 XII. UTILITIES AND SERVICE SYSTEMS
Issues Potentially Potentially Less-Than No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in a need for new systems or
supplies, or substantial alterations to the following
•
a. Power or natural gas?
b. Communications systems?
•
Fa local or regional water treatment or distribution
Stormwater drainage
¡olid waste disposal
g. Local or regional water supplies?
Setting/Discussion
The project would increase the availability of signals for wireless networking, which is the purpose of the project. No other new utilities or service systems are anticipated as related to this project.

Conclusion
The project will not result in a significant impact to utility or service systems CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 22 XIII. AESTHETICS
Issues Potentially 1 Less-Than- No
Significant Impact
Simificant Impact
Mitigation
Incorporated
Would the proposal:

Affect a scenic vista or scenic highway?
D. Have a demonstrable negative aesthetic effect?
•
Create light or glare?
Setting/Discussion
b. The project tower will be disguised as a decorative bell tower, designed to complement surrounding proposed development in the Centennial Park area, so as not to appear as a telecommunication equipment. Further, the project site will be surrounded by a solid wall.

Conclusion
The project will not have a significant adverse effect on the aesthetic quality of the City.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 23 XIV. CULTURAL RESOURCES
Issues Potentially Potentially Less-Than- No
Significant Significant Simificant Impact
Impact unless
Mitigation
Incorporated
Would the proposal:
: Affect historical resources?

1. Have the potential to cause a physical change
which would affect unique ethnic cultural values?
Restrict existing religious or sacred uses within
fine portensal impact area?
Setting
A review of relevant archaeological literature found no evidence of prehistoric, historic or archeological sites within the project vicinity according to the archival record. The construction project is subject to mitigation measures from the 2010 General Plan EIR. If cultural resources are unearthed during excavation or construction, the project will be halted and appropriate agencies contacted for further site assessment.

Conclusion
Development of the project site will have no effect on archaeological, historic or paleontological resources.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 24 XV. RECREATION
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Increase the demand for neighborhood or
regional parks or other recreational facilities?
• Affect existing recreational opportunities?
Setting/Discussion
The project will not result in a significant impact to recreational resources. The project would be located in a regional park/community center area and has been designed to fit within the overall concept and placed in an unobtrusive location.

Conclusion
Project related impacts to recreation facilities and opportunities are considered less than significant.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 25 XVI. MANDATORY FINDINGS OF SIGNIFICANCE
Issues Potentially Potentially Less-Than-
ignificant Significant Significant Impac
unless mpact
Mitigation
Incorporated
la. Does the project have the potential to degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten o eliminate a plant or animal community, reduce the
number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory?
b. Does the project have the potential to achieve short- • term, to the disadvantage of long-term, environmental
goals?
c. Does the project have impacts that are individually
limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a
project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) d. Does the project have environmental effects that will cause substantial adverse effects on human beings, either directly or indirectly?
Discussion of Checklist Answers
The project is not expected to result in significant adverse impacts on the environment.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 26 XVII. Determination
In accordance with Sections 15152 and 15168 of the State CEQA Guidelines, this initial study has been prepared to evaluate the potential impacts of the proposed project.

On the basis of this initial evaluation:
- I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.

X I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described in the initial study. A NEGATIVE DECLARATION will be prepared.
— I find that the project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
- I find that the proposed project MAY have a significant effects) on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets, if the effect is a "potentially significant impact" or "potentially significant unless mitigated." An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.

I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects (a) have been analyzed adequately in an earlier EIR pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project.

11.18-21
Joel Andrews Date
City Planner
City of Patterson
(209) 895-8024
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 27 Environmental Noise Assessment
CVL01687 Patterson 2 AT&T Cellular Facility
Patterson, California
BAC Job # 2019-209
Prepared For:

Complete Wireless Consulting
Attn: Steve Proo
2009 V Street
Sacramento, CA 95818
Prepared By:

Bollard Acoustical Consultants, Inc.

Pario Hitchet
Dario Gotchet, Senior Consultant
October 14, 2020
1) COLLARD
Acoustical Consultants
Bollard Acoustical Consultants, Inc. • 3551 Bankhead Road, Loomis, CA 95650 • Phone: (916) 663-0500 • bacnoise.com Bollard Acoustical Consultants, Inc.

Introduction
The CVL01687 Patterson 2 AT&T Wireless Unmanned Telecommunications Facility Project (project) proposes the installation of cellular equipment within a lease area located at 15421 North gth Street in Patterson, California (APN: 048-048-010). The externally mounted HVAC unit of a pre-manufactured concrete walk-in cabinet and an emergency diesel standby generator have been identified as the primary noise sources associated with the project. The project overall site plan is shown on Figure 1. The studied site drawings are dated September 16, 2020.

Bollard Acoustical Consultants, Inc. (BAC) has been contracted by Complete Wireless Consulting, Inc. to complete an environmental noise assessment regarding the proposed project cellular equipment operations. Specifically, the following assessment addresses daily noise production and exposure associated with operation of the project emergency generator and HVAC equipment.

Please refer to Appendix A for definitions of acoustical terminology used in this report. Appendix B illustrates common noise levels associated with various sources.

Criteria for Acceptable Noise Exposure
City of Patterson General Plan
The Health and Safety Element of the City of Patterson General Plan establishes performance standards for non-transportation (stationary) noise sources, such as those proposed by the project. The non-transportation noise level limits contained in the General Plan have been reproduced and are provided below in Table 1.

Table 1
Noise Level Performance Standards for New Projects Affected by or Including Non-Transportation Noise Sources'
Daytime Nighttime
Noise Level Descriptor (7:00 a.m. to 10:00 p.m.) (10:00 p.m. to 7:00 a.m.) Hourly Lea, dB 50 45
Maximum Level (Lmax), dB 70 65
Source: City of Patterson General Plan, Health and Safety Element, Table HS-1 Project Noise Generation
As discussed previously, there are two project noise sources which are considered in this evaluation: the externally mounted HVAC unit of the pre-manufactured concrete walk-in cabinet and the emergency diesel generator. The evaluation of potential noise impacts associated with the operation of each noise source is evaluated separately as follows:

Environmental Noise Assessment
CVL 01687 Patterson 2 AT&T Cellular Facility - Patterson, California

WARD AVENUE PROPERTY LINE
APN: 048-048-010
Project Parcel
208-4
EXISTING 100'-0 WIDE RIGHT OF WAY

EXISTING CONCRETE SIDEWALK

PROPERTY JINE
EXISTING RESIDENCE (TYP.) -
Lo-Denty Residential

PROPOSED AT&T UNDERGROUND FIBER
12900)

ENLARGED SITE PLAN
A-1.2)

EXISTING TELCO GROUND VAULT, PROPOSED
AT&T FIBER P.O.F.

EXISTING 80'-0" WIDE RIGHT OF WAY
Legend CVL01687 Patterson 2 AT&T Cellular Facility
Proposed AT&T Cellular Facility Lease Area Patterson, California Parcel Boundaries
Project Overall Site Plan
Scale (Feet)
Figure 1 1)) BOLLARIN
100 Acoustical Consulants
Bollard Acoustical Consultants, Inc.

HVAC Equipment Noise Source and Reference Noise Level
The project proposes the installation of a pre-manufactured concrete walk-in cabinet equipped with one (1) externally mounted HVAC unit within the equipment lease area illustrated on Figure

1. According to the project site plan, the HVAC unit assumed for the project is a Marvair Airxcel, Inc. Model ECUA18ACA. Based on reference noise level data obtained from the manufacturer (Marvair Airxcel, Inc.), this specific HVAC unit model has a reference noise level of 62 dB at a distance of 5 feet. The manufacturer's noise level data specification sheet for the proposed HVAC equipment is provided as Appendix C.

Generator Noise Source and Reference Noise Level
The project also proposes the installation of an emergency standby diesel generator within the lease area to maintain cellular service during emergency power outages. Based on the project site plans, the generator assumed for this project is a Generac Industrial Power Systems Model SDO30. It is further assumed that the proposed generator will be equipped with the Level 2 Acoustic Enclosure resulting in a reference noise level of 68 dB at a distance of 23 feet. The manufacturer's noise level data specification sheet for the proposed generator and acoustical enclosure is provided as Appendix D.

The generator which is proposed at this site would only operate during emergencies (power outages) and brief daytime periods for periodic maintenance/lubrication. According to the project applicant, testing of the generator would occur twice per month, during daytime hours, for a duration of approximately 15 minutes. The emergency generator would not operate at night, except during power outages. It is expected that nighttime operation of the project emergency generator would be exempt from the city's exterior noise exposure criteria due to the need for continuous cellular service provided by the project equipment.

Predicted Facility Noise Levels at the Nearest Noise-Sensitive Property Lines According to footnote 1 of Table 1, the city's noise standards are to be applied at the property line of a noise-sensitive land use. The nearest noise-sensitive uses have been identified as low- density residential uses located west of the project. According to the project site plans, the proposed cellular facility lease area maintains a separation of approximately 208 feet from the nearest residential property line to the west, APN: 021-036-043. Assuming standard spherical spreading loss (-6 dB per doubling of distance), project equipment noise exposure at the property line of the nearest residential use was calculated and the results of those calculations are presented in Table 2. Satisfaction of the city's noise criteria at the nearest residential use would ensure for satisfaction of the criteria at residential uses located farther away.

Table 2
Summary of Project-Related Noise Exposure at the Nearest Noise-Sensitive Property Line Distance from Cellular Predicted Equipment Noise Levels, dBA APN' Facility Lease Area (ft)? HVAC, Lea Generator, Lmax 021-036-043 208 30 49
" Parcel boundaries are shown on Figure 1.
2 Distance was scaled using the provided site plans dated 9/16/20 Environmental Noise Assessment
CVL01667 Patterson 2 AT&T Cellular Facity - Patterson, Califoge a Bollard Acoustical Consultants, Inc.

Because the proposed HVAC unit could potentially be in operation during nighttime hours, the operation of the HVAC unit would be subject to the General Plan nighttime noise level standard of 45 dB Leg (Table 1). As indicated in Table 2, the predicted HVAC equipment noise level of 30 dB Leq at the property line of the nearest noise-sensitive use (low-density residential) would satisfy the General Plan 45 dB Leq nighttime noise level limit by a wide margin. As a result, no further consideration of HVAC equipment noise mitigation measures would be warranted for the project.

Because the project generator would only operate during daytime hours for brief periods required for testing and maintenance, and because generator noise is assumed to be exempt during emergency operations, noise from the generator would be subject to the General Plan daytime noise level standard of 70 dB Lmax. As shown in Table 2, the predicted generator noise level of 49 dB Lmax at the property line of the nearest noise-sensitive use (low-density residential) would satisfy the General Plan 70 dB Lmax daytime noise level standard by a wide margin. As a result, no further consideration of emergency generator noise mitigation measures would be warranted for the project.

Conclusions
Based on the equipment noise level data and analyses presented above, project-related equipment noise exposure is expected to satisfy the applicable City of Patterson General Plan noise level criteria at the closest noise-sensitive uses. As a result, no further consideration of project equipment noise mitigation measures would be warranted for this project.

This concludes our environmental noise assessment for the proposed CVL01687 Patterson 2 AT&T Cellular Facility in Patterson, California. Please contact BAC at (916) 663-0500 or [email protected] with any questions or requests for additional information.

Environmental Noise Assessment
CVL01687 Patterson 2 AT&T Cellular Facility - Patterson, California

Page 4 ends

Appendix A
Acoustical Terminology
Acoustics The science of sound.

Ambient The distinctive acoustical characteristics of a given space consisting of all noise sources Noise audible at that location. In many cases, the term ambient is used to describe an existing or pre-project condition such as the setting in an environmental noise study.

Attenuation The reduction of an acoustic signal.

A-Weighting A frequency-response adjustment of a sound level meter that conditions the output signal to approximate human response.

Decibel or dB Fundamental unit of sound, A Bell is defined as the logarithm of the ratio of the sound pressure squared over the reference pressure squared. A Decibel is one-tenth of a Bell.

CNEL Community Noise Equivalent Level. Defined as the 24-hour average noise level with noise occurring during evening hours (7 - 10 p.m.) weighted by a factor of three and nighttime hours weighted by a factor of 10 prior to averaging.

Frequency The measure of the rapidity of alterations of a periodic signal, expressed in cycles per second or hertz.

Lon Day/Night Average Sound Level. Similar to CNEL but with no evening weighting.

Leg Equivalent or energy-averaged sound level.

Lmax The highest root-mean-square (RMS) sound level measured over a given period of time.

Loudness A subjective term for the sensation of the magnitude of sound.

Masking The amount (or the process) by which the threshold of audibility is for one sound is raised by the presence of another (masking) sound
Noise Unwanted sound.

Peak Noise The level corresponding to the highest (not RMS) sound pressure measured over a given period of time. This term is often confused with the Maximum level, which is the highest RMS level.

RTen The time it takes reverberant sound to decay by 60 dB once the source has been removed.

Sabin The unit of sound absorption. One square foot of material absorbing 100% of incident sound has an absorption of 1 sabin.

SEL A rating, in decibels, of a discrete event, such as an aircraft flyover or train passby, that compresses the total sound energy of the event into a 1-s time period.

Threshold The lowest sound that can be perceived by the human auditory system, generally of Hearing considered to be 0 dB for persons with perfect hearing.

Threshold Approximately 120 dB above the threshold of hearing of Pain

BOLLARD
Acoustical Consultants
Appendix B
Typical A-Weighted Sound Levels of Common Noise Sources Decibel Scale (dBA)*
160
12-Gauge Shotgun 160
150
140
Jet Takeotf 140
130
120 Pneumatic Riveter 124
110 Hammer Drill 114
Chainsaw 110
100 Rock Concert 105
Motorcycle 100
90 Tractor/Hand Drill 97
Lawn Mower 90
80 Vacuum Cleaner 80
City Traffic 78
70 Conversation 65 60
Air Conditioning Unit 60
50 Floor Fan 50
40 Electrical Transformer 45
Refrigerator Hum 40
30 •Scurces
Rustling Leaves 30
20 Pin Falling 15 •
10 Appendix C
Marvair
156 Seeding Drive
Cordele, Georgia 31015
229-273-0753
Sound Pressure Level for the Industrial Product Air Conditioners (dBA) Distance From Model Number
Unit (Feet) ECUADSACA ECUAOSACA ECUAO1ZACA ECUADISACA

51.5 62

50.7 58
20 47.8 55
30 46.5 51
40 45.6
50 45.6
60 70
80 Notes: (1) Date: July 1,2019
(2) Background Sound Pressure Level: 41 dA
(3) Sound Level Meter 1 Meter Above Ground Directly in Line with Outdoor Coil (4) All units - 410A Refrigerat
Appendix D GENERAC* INDUSTRIAL
Diesel
SD030 dimensions, weights and sound levels

OPEN SET

RUN TIME USABLE

HOURS CAPACITY
(GAL) H WT dBA*
H
NO TANK 76 38 46 2060
54฿ 76 38 59 2540 5 of 5
20 48 132 38 71 2770 82
" 211 76 3B 63 2979
109 300 93 38 87 3042

STANDARD ENCLOSURE

RUN TIME USABLE

HOURS CAPACITY
(GAL) H WT dBA•
H NO TANK 2362
50 20 54 95 38 63 2842
48 132 95 75 3072
77 211 95 38 87 3281
109 300 95 38 91 3344
LEVEL 1 ACOUSTIC ENCLOSURE

RUN TIME USABLE

HOURS CAPACITY
(GAL) H WT dBA-
NO TANK 113 38 50 2515
H
20 54 113 38 63 2995
48 132 113 38 75 3225 70
77 211 113 36 87 3434
109 300 113 38 91 3497
LEVEL 2 ACOUSTIC ENCLOSURE

RUN TIME USABLE

CAPACITY
HOURS (GAL) L H WT dBA•
NO TANK 95 38 62 2520
20 54 95 38 75 3000
H
48 132 95 36 87 3230 68
77 211 95 99 3439
109 300 95 38 103 3502
W
Tank Options YOUR FACTORY RECOGNIZED GENERAC INDUSTRIAL DEALER

MDEO OPT
Florida DERM/DEP OPT
Chicago Fire Code OPT
IFC Certification CALL

ULC CALL
Olher Custom Options Available from your
Generac Industrial Power Dealer
Speciation charactenslics may change without nobce. Dimensions and weights are for prelimanary purposes only Please consult a Generac Power Systems Industrial Dealer for detailed installation drawings Generac Power Systems, Inc. • 545 W29290 HWY. 59, Waukesha, WI 53189 • generac. com 32012 Generac Power Systems, Inc All nghts reserved All speciticatons are subyect to change without notice. Bullet 0195010SBY-B/ Printed in US.A 02/15/12 Radio Frequency - Electromagnetic Energy
(RF-EME) Compliance Report
Site No. CVL01687
MRSFR065960/MRSFR065841/MRSFR065943/
MRSFR053894/MRSFR065826/MRSFR065873
Patterson 2
15421 N. 9th Stir 95363
Patterson,
Stanislaus County

37.46837500; - 12I.14050600 NAD83
The proposed AT&T installation will be in compliance with FCC regulations upon proper installation of recommended signage.

EBI Project No. 6220005716
November 4, 2020
218 Red Robin Dr,
Patterson, CA 95363, US
Prepared for:

AT&T Mobility, LLC
c/o Complete Wireless Consulting, Inc.
2009 V Street
Sacramento, CA 95818
Prepared by:
environmental | engineering | due diligence
RF-EME Compliance Report USID No. 294157 Site No. CVL01687 EBl Project No. 6220005716 1542| N 9th Street, Patterson, California

TABLE OF CONTENTS
EXECUTIVE SUMMARY........ 1

1.0 FEDERAL COMMUNICATIONS COMMISSION (FCC) REQUIREMENTS ...3

2.0 AT&T RF EXPOSURE POLICY REQUIREMENTS ... 5

3.0 WORST-CASE PREDICTIVE MODELING.. ... 5

4.0 RECOMMENDED SIGNAGE/COMPLIANCe PLAN. .... 7

5.0 SUMMARY AND CONCLUSIONS......... .. 8

6.0 LIMITATIONS.... 8

APPENDICES
Appendix A Personnel Certifications
Appendix B Compliance/Signage Plan
EBI Consulting • 21 B Street • Burlington, MA 01803 + 1.800.786.2346 RF-EME Compliance Report USID No. 294157 Site No. CVL01 687 EBI Project No. 6220005716 1542| N 9th Street, Patterson, California

EXECUTIVE SUMMARY
Purpose of Report
EnviroBusiness Inc. (dba EBI Consulting) has been contracted by AT&T Mobility, LLC to conduct radio frequency electromagnetic (RF-EME) modeling for AT&T Site CVL01687 located at 15421 N 9th Street in Patterson, California to determine RF-EME exposure levels from proposed AT&T wireless communications equipment at this site. As described in greater detail in Section I.0 of this report, the Federal Communications Commission (FCC) has developed Maximum Permissible Exposure (MPE) Limits for general public exposures and occupational exposures. This report summarizes the results of RF-EME modeling in relation to relevant FCC RF-EME compliance standards for limiting human exposure to RF-EME fields.

This report contains the RF EME analysis for the site, including the following:
• Site Plan with antenna locations
• Graphical representation of theoretical ME fields based on modeling • Graphical representation of recommended signage and/or barriers This document addresses the compliance of AT&T's transmitting facilities independently and in relation to all collocated facilities at the site.

Statement of Compliance
A site is considered out of compliance with FCC regulations if there are areas that exceed the FCC exposure limits and there are no RF hazard mitigation measures in place. Any carrier which has an installation that contributes more than 5% of the applicable MPE must participate in mitigating these RF hazards.

As presented in the sections below, based on worst-case predictive modeling, there are no modeled exposures on any accessible ground walking/working surface related to ATT's proposed antennas that exceed the FCC's occupational and/or general public exposure limits at this site.

As such, the proposed AT&T installation is in compliance with FCC regulations upon proper installation of recommended signage and/or barriers.

AT&T Recommended Signage/Compliance Plan
AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, requires that:

1. All sites must be analyzed for RF exposure compliance;

2. All sites must have that analysis documented; and

3. All sites must have any necessary signage and barriers installed.

Site compliance recommendations have been developed based upon protocols presented in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, additional guidance provided by AT&T, EBl's understanding of FCC and OSHA requirements, and common industry practice. Barrier locations have been identified (when required) based on guidance presented in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 20/4.

EBI Consulting • 21 B Street + Burlington, MA 01803 • 1.800.786.2346 T RF-EME Compliance Report USID No. 294157 Site No. CVL01687 EBI Project No. 6220005716 15421 N 9th Street, Patterson, California The following signage is recommended at this site:
• Yellow CAUTION 2B sign posted at the base of the faux water tank near the climbing ladder.

The signage proposed for installation at this site complies with AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document and therefore complies with FCC and OSHA requirements. Barriers are not recommended on this site. To reduce the risk of exposure and/or injury, EBl recommends that access to the faux water tank or areas associated with the active antenna installation be restricted anc secured where possible. More detailed information concerning site compliance recommendations is presented in Section 4.0 and Appendix B of this report.

EBI Consulting • 2l B Street • Burlington, MA 01803 • 1.800.786.2346 RF-EME Compliance Report USID No. 294157 Site No. CVL01687 EBI Project No. 6220005716 15421 N 9th Street, Patterson, California

1.0 FEDERAL COMMUNICATIONS COMMISSION (FCC) REQUIREMENTS The FCC has established Maximum Permissible Exposure (MPE) limits for human exposure to Radiofrequency Electromagnetic (RF-EME) energy fields, based on exposure limits recommended by the National Council on Radiation Protection and Measurements (NCRP) and, over a wide range of frequencies, the exposure limits developed by the Institute of Electrical and Electronics Engineers, Inc (IEEE) and adopted by the American National Standards Institute (ANSI) to replace the 1982 ANSI guidelines. Limits for localized absorption are based on recommendations of both ANSI/IEEE and NCRP.

The FCC guidelines incorporate two separate tiers of exposure limits that are based upon occupational/controlled exposure limits (for workers) and general public/uncontrolled exposure limits for members of the general public.

Occupationallcontrolled exposure limits apply to situations in which persons are exposed as a consequence of their employment and in which those persons who are exposed have been made fully aware of the potential for exposure and can exercise control over their exposure. Occupational/ controlled exposure limits also apply where exposure is of a transient nature as a result of incidental passage through a location where exposure levels may be above general public/uncontrolled limits (see below), as long as the exposed person has been made fully aware of the potential for exposure and can exercise control over his or her exposure by leaving the area or by some other appropriate means.

General public/uncontrolled exposure limits apply to situations in which the general public may be exposed or in which persons who are exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure. Therefore, members of the general public would always be considered under this category when exposure is not employment-related, for example, in the case of a telecommunications tower that exposes persons in a nearby residential area.

Table | and Figure I (below), which are included within the FCC's OET Bulletin 65, summarize the MPE limits for RF emissions. These limits are designed to provide a substantial margin of safety. They vary by frequency to take into account the different types of equipment that may be in operation at a particular facility and are "time-averaged" limits to reflect different durations resulting from controlled and uncontrolled exposures.

The FCC's MPEs are measured in terms of power (mW) over a unit surface area (cm2). Known as the power density, the FCC has established an occupational MPE of 5 milliwatts per square centimeter (mW/cm?) and an uncontrolled MPE of | mW/cm2 for equipment operating in the 1900 MHz frequency range. For the AT&T equipment operating at 850 MHz, the FCC's occupational MPE is 2.83 mW/cm? and an uncontrolled MPE of 0.57 mW/cm?. For the AT&T equipment operating at 700 MHz, the FCC's occupational MPE is 2.33 mW/cm? and an uncontrolled MPE of 0.47 mW/cm?. These limits are considered protective of these populations.

Table I: Limits for Maximum Permissible Exposure (MPE)
(A) Limits for Occupational/Controlled Exposure
Frequency Range Electric Field Magnetic Field Power Density (S) Averaging Time (MHiz) Strength (E) Strength (H) (mW/cm?) (EX, [H], or S (V/m) (Alm) (minutes)

0.3-3.0 614 1.63 (100)* 6

3.0-30 1842/f 4.89/f (900/P)* 6
30-300 61.4 0.163 1.0
300-1,500 - f/300
1,500-100,000 5
EBI Consulting • 21 B Street + Burlington, MA 01803 • 1.800.786.2346 3 RF-EME Compliance Report USID No. 294157 Site No. CVLO1 687 EBl Project No. 6220005716 15421 N 9th Street, Patterson, California (B) Limits for General Public/Uncontrolled Exposure
Frequency Range Electric Field Magnetic Field Power Density (S) (MHz) Strength (E) Strength (H) (mW/cm?)
(V/m) (A/m) (minutes)

0.3-1.34 614 1.63 (100)* 30

1.34-30 824/F 2.19/f (180/P)* 30
30-300 27.5 0.073 0.2 30
300-1,500 f/1,500 30
1,500-100,000 1.0 30
f= Frequency in (MHz)
* Plane-wave equivalent power density
Figure 1. FCC Limits for Maximum Permissible Exposure (MPE) Plane-wave Equivalent Power Density
1,000 T - T
• Occupational/Controlled Exposure
- - General Population/Uncontrolled Exposure
100H
10-
Power Density (mW/cm?)

0.2-

0.1 L 30,000

0.03 0.3 300 13,000 $ 300,000

1.34 1,500 100,000
Frequency (MHz)
Based on the above, the most restrictive thresholds for exposures of unlimited duration to RF energy for several personal wireless services are summarized below:

Approximate Occupational Public MPE
Personal Wireless Service MPE
Frequency
Microwave (Point-to-Point) 5,000 - 80,000 MHz 5.00 mW/cm? 1.00 mW/cm? Broadband Radio (BRS) 2,600 MHz 5.00 mW/cm? 1.00 mW/cm* Wireless Communication (WCS) 2,300 MHz 5.00 mW/cm? 1.00 mW/cm? Advanced Wireless (AWS) 2,100 MHz 5.00 mW/cm' 1.00 mW/cm? Personal Communication (PCS) 1,950 MHz 5.00 mW/cm? 1.00 mW/cm' Cellular Telephone 870 MHz 2.90 mW/cm? 0.58 mW/cm'
Specialized Mobile Radio (SMR) 855 MHz 2.85 mW/cm? 0.57 mW/cm' Long Term Evolution (LTE) 700 MHz 2.33 mW/cm' 0.47 mW/cm? Most Restrictive Frequency Range 30-300 MHz 1.00 mW/cm? 0.20 mW/cm? MPE limits are designed to provide a substantial margin of safety. These limits apply for continuous exposures and are intended to provide a prudent margin of safety for all persons, regardless of age, gender, size, or health.

EBI Consulting * 21 B Street + Burlington, MA 01803 • 1.800.786.2346 4 USID No. 294157 Site No. CVL01687
RF-EME Compliance Report
EBI Project No. 6220005716 15421 N 9th Street, Patterson, California Personal Communication (PCS) facilities used by AT&T in this area operate within a frequency range of 700-1900 MHz. Facilities typically consist of: I) electronic transceivers (the radios or cabinets) connected to wired telephone lines; and 2) antennas that send the wireless signals created by the transceivers to be received by individual subscriber units (PCS telephones). Transceivers are typically connected to antennas by coaxial cables.

Because of the short wavelength of PCS services, the antennas require line-of-site paths for good propagation, and are typically installed above ground level. Antennas are constructed to concentrate energy towards the horizon, with as little energy as possible scattered towards the ground or the sky.

This design, combined with the low power of PCS facilities, generally results in no possibility for exposure to approach Maximum Permissible Exposure (MPE) levels, with the exception of areas directly in front of the antennas.

2.0 AT&T RF EXPOSURE POLICY REQUIREMENTS
AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, requires that:

I. All sites must be analyzed for RF exposure compliance;

2. All sites must have that analysis documented; and

3. All sites must have any necessary signage and barriers installed.

Pursuant to this guidance, worst-case predictive modeling was performed for the site. This modeling is described below in Section 3.0. Lastly, based on the modeling and survey data, EBl has produced a Compliance Plan for this site that outlines the recommended signage and barriers. The recommended Compliance Plan for this site is described in Section 4.0.

3.0 WORST-CASE PREDICTIVE MODELING
In accordance with AT&T's RF Exposure policy, EBl performed theoretical modeling using RoofMaster ™ communications services. Using the computational methods set forth in Federal Communications (FCC) Office of Engineering & Technology (OET) Bulletin 65, "Evaluating Compliance with FCC Guidelines for predicted power density in a scalable grid based on the contributions of all RF sources characterized in the study scenario. At each grid location, the cumulative power density is expressed as a percentage of the FCC limits. Manufacturer antenna pattern data is utilized in these calculations. RoofMaster T models consist of the Far Field model as specified in OET-65 and an implementation of the OET-65 Cylindrical Model (Sula9). The models utilize several operational specifications for different types of antennas to produce a plot of spatially-averaged power densities that can be expressed as a percentage of the applicable exposure limit.

For this report, EBl utilized antenna and power data provided by AT&T and compared the resultant worst-case MPE levels to the FCC's occupational/controlled exposure limits outlined in OET Bulletin 65.

The assumptions used in the modeling are based upon information provided by AT&T and information gathered from other sources. There are no other wireless carriers with equipment installed at this site.

Based on worst-case predictive modeling, there are no modeled exposures on any accessible ground walking/working surface related to ATT's proposed antennas that exceed the FCC's occupational and/or general public exposure limits at this site.

EBI Consulting • 21 B Street • Burlington, MA 01803 • 1.800.786.2346 RF-EME Compliance Report USID No. 294157 Site No. CVL0I687 EBI Project No. 6220005716 1542| N 9th Street, Patterson, California At the nearest walking/working surfaces to the AT&T antennas on the ground, the maximum power density generated by the AT&T antennas is approximately 0.34 percent of the FCC's general public limit (0.07 percent of the FCC's occupational limit). The composite exposure level from all carriers on this site is approximately 0.34 percent of the FCC's general public limit (0.07 percent of the FCC's occupational limit) at the nearest walking/working surface to each antenna.

A graphical representation of the RoofMaster ™ modeling results is presented in Appendix B.

Microwave dish antennas are designed for point-to-point operations at the elevations of the installed equipment rather than ground-level coverage. Based on AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, microwave antennas are considered compliant if they are higher than 20 feet above any accessible walking/working surface. There are no microwaves installed at this site.

EBI Consulting • 2l B Street • Burlington, MA 01803 • 1.800.786.2346 RF-EME Compliance Report USID No. 294157 Site No. CVLO1687 EBI Project No. 6220005716 15421 N 9th Street, Patterson, California

4.0 RECOMMENDED SIGNAGE/COMPLIANCE PLAN
Signs are the primary means for control of access to areas where RF exposure levels may potentially exceed the MPE. As presented in the AT&T guidance document, the signs must:

Be posted at a conspicuous point;
Be posted at the appropriate locations;
Be readily visible; and
• Make the reader aware of the potential risks prior to entering the affected area.

The table below presents the signs that may be used for AT&T installations.

CRAN / HETNET Small Cell Decals / Signs Alerting Signs
NOTICE
NOTICE (10))
RF energy emitted by this antenna may exceed the FCC's NOTICE exposure limits for the general population
DECAL
Stay at least 1 feet away from the antenna.

Call AT&T at 800-638-2822. option 9 then 3, for help if you need access within feet. SCAR HOUS Rosen

TRILINGUAL
NOTICE NOTICE 2

A CAUTION A CAUTION
NOTICE
AT&T operates antennas at this structure
this point you are entering an
area where radio frequency (RF) fields
nay exceed the FCC General Population
NOTICE Pered s Pass pos at mares a an
Follow safety guidelines for working in an
le The Satal line you see ratestos so are
RF environment
SIGN
Keep ft away from the fronts of the
antennas.

Contact ATST at 800-638-2822 opL 9. 3 MATT 00000e 9 mos and follow their instrucilons prior to and ferna bei intract sos prior to perferned pertorming any maintenanco or repairs They tom wounde died ara above this point CAUTION 2 -
This is AT&T Site USID.

ROOFTOP CAUTION 2A
A CAUTION® A CAUTION®
A CAUTION A 1(8)
On this tower:
&F energy omitted by this antonna may exceed the FCC'S red as Poet you are mirag, an

CAUTION
ccupational exposure limits
DECAL fate at puerten to make a is
Stay at least 1 feol away from the antenna.

Call ATaT at 800-638-2822, option 9 then 3, for halp if you Anure diably the lor lead he thank boringele
need access within 1 feet. anana raring de sure seen
• Martia
CAUTION 2B - CAUTION 2C -

TOWER PARAPETS

A CAUTION A A WARNING A WARNING
AT&T operates entennas at this structure.
this point you are entering ar
area where radio frequency (RF; fieldi
may excoed the FCC Occupational ((o)
exposure limits.

CAUTION All: careen arts at for vee
ollow safety quidelines for working in a
F environment SIGN
Kenna" amy from the fronts of the
ntact AT&T at 800-638-2822. opt. Landed 1241 0457352 open and! 1 follow their instructions prior
performing any maintenance of repairs
above this point.

Coll See USID_
WARNING IB WARNING 2A
EBl Consulting • 21 B Street + Burlington, MA 01803 • 1.800.786.2346 7 RF-EME Compliance Report USID No. 294157 Site No. CVL01687 EBI Project No. 6220005716 15421 N 9th Street, Patterson, California Based upon protocols presented in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, and additional guidance provided by AT&T, the following signage is recommended on the site:
• Yellow CAUTION 2B sign posted at the base of the faux water tank near the climbing ladder.

No barriers are required for this site. Barriers should be constructed of weather-resistant plastic or wood fencing. Barriers may consist of railing, rope, chain, or weather-resistant plastic if no other types are permitted or are feasible. Painted stripes should only be used as a last resort and only in regions where there is little chance of snowfall. If painted stripes are selected as barriers, it is recommended that the stripes and signage be illuminated. The signage and any barriers are graphically represented in the Signage Plan presented in Appendix B.

5.0 SUMMARY AND CONCLUSIONS
EBl has prepared this Radiofrequency Emissions Compliance Report for the proposed AT&T telecommunications equipment at the site located at 1542l N 9th Street in Patterson, California.

EBI has conducted theoretical modeling to estimate the worst-case power density from AT&T antennas to document potential MPE levels at this location and ensure that site control measures are adequate to meet FCC and OSHA requirements, as well as AT&T's corporate RF safety policies. As presented in the preceding sections, based on worst-case predictive modeling, there are no modeled exposures on any accessible ground walking/working surface related to ATT's proposed antennas that exceed the FCC's occupational and/or general public exposure limits at this site.

To reduce the risk of exposure and/or injury, EBl recommends that access to the faux water tank or areas associated with the active antenna installation be restricted and secured where possible. Signage is -ecommended at the site as presented in Section 4.0 and Appendix B. Posting of the signage brings the site into compliance with FCC rules and regulations and AT&T's corporate RF safety policies.

6.0 LIMITATIONS
This report was prepared for the use of AT&T Mobility, LLC to meet requirements outlined in AT&T's corporate RF safety guidelines. It was performed in accordance with generally accepted practices of other consultants undertaking similar studies at the same time and in the same locale under like client. The observations in this report are valid on the date of the investigation. Any additional information that becomes available concerning the site should be provided to EBI so that our conclusions may be revised and modified, if necessary. This report has been prepared in accordance vith Standard Conditions for Engagement and authorized proposal, both of which are integral parts of his report. No other warranty, expressed or implied, is made EBI Consulting * 21 B Street + Burlington, MA 01803 • 1.800.786.2346 8 USID No. 294157 Site No. CVL01687
RF-EME Compliance Report
EBI Project No. 6220005716 15421 N 9th Street, Patterson, California Appendix A
Personnel Certifications
EBI Consulting + 21 B Street • Burlington, MA 01803 • 1.800.786.2346 9 RF-EME Compliance Report USID No. 294157 Site No. CVLO1687 EBI Project No. 6220005716 1542| N 9th Street, Patterson, California Preparer Certification
I, Andrew Simpson, state that:
• I am an employee of EnviroBusiness Inc. (d/b/a EBl Consulting), which provides RF-EME safety and compliance services to the wireless communications industry.

I have successfully completed RF-EME safety training, and am aware of the potential hazards from RF-EME and would be classified "occupational" under the FCC regulations. • I am fully aware of and familiar with the Rules and Regulations of both the Federal Communications Commissions (FCC) and the Occupational Safety and Health Administration (OSHA) with regard to Human Exposure to Radio Frequency Radiation. • I have been trained in on the procedures outlined in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document (dated October 28, 2014) and on RF-EME modeling using RoofMaster ™M modeling software.
• I have reviewed the data provided by the client and incorporated it into this Site Compliance Report such that the information contained in this report is true and accurate to the best of my knowledge.

Oncew smpson
EBI Consulting • 21 B Street • Burlington, MA 01803 • 1.800.786.2346 10 RF-EME Compliance Report USID No. 294157 Site No. CVL01687 EBI Project No. 6220005716 15421 N 9th Street, Patterson, California Reviewed and Approved by:

STEL A. MCC
E8898
EXP. 30 SEPZI/

SATE OF CALIFORN ELECTRICAL
sealed 04nov2020
Michael McGuire
Electrical Engineer
[email protected]
Note that EBl's scope of work is limited to an evaluation of the Radio Frequency - Electromagnetic Energy (RF-EME) field generated by the antennas and broadcast equipment noted in this report. The engineering and design of the building and related structures, as well as the impact of the antennas and broadcast equipment on the structural integrity of the building, are specifically excluded from EBl's scope of work.

EBI Consulting • 2l B Street + Burlington, MA 01803 • 1.800.786.2346 USID No. 294157 Site No. CVLOI687
EF: Projeco o. 620009016 1542| N 9th Street, Patterson, California Appendix B
Compliance/Signage Plan
EBI Consulting • 2l B Street • Burlington, MA 01803 • 1.800.786.2346 12 RF-EME Compliance Report USID No. 294157 Site No. CVL01687 EBI Project No. 6220005716 1542| N 9th Street, Patterson, California Nearest Walking Surface Simulation

SECTOR A
nn Bi Pn
Eo-

SECTOR D

SECTOR B
20-
"ACAUTION
Proposed CAUTION
2B Sign at Base of
Faux Water Tank

SECTOR C
Percent MPE Legend
0% - 100%
100% - 500%
500% - 5000%
5000%+
Public Limits
Sula 9
10 foot grid size
Avg: 0 to 6 Feet
Carrier Color Code
O ATT

SIGN IDENTIFICATION LEGEND
AT&T NOTICE 2 Sign AT&T CAUTION 2 - Rooftop Sign
Existing Sign
AT&T WARNING IB and 2A Signs AT&T CAUTION 2B - Tower Sign Proposed Sign ALITE
AT&T NOTICE Small Cell Signs de AT&T CAUTION 2C - Parapet Sign Installed Sign 1249000 AT&T CAUTION Small Cell Signs AT&T TRILINGUAL NOTICE Sign EBI Consulting • 21 B Street • Burlington, MA 01803 • 1.800.786.2346 13 CVL01687 Zoning Propagation Map
January 11, 2021
Existing LTE 700 Coverage
IS vasur
-ta tynn Dr Paramalla
Sitter Greet
Sara Crook
Patterson
High School
NESian S: ath St
Goersey S •CVL01687
Tersk Ct
Ken contente
Save Mart
Legend
Reliable Service Indoors/Outdoors
Reliable Coverage in Transit
Walmart
Supercenter Indoor Coverage Less Reliable
Reliable Coverage Outdoors Only
Indoor Coverage Less Reliable
January 11, 2021 Existing site
Proposed site
at&t
Proposed LTE 700 Coverage - 15421 NORTH 9TH STREET @ RC = 74 ft is persing Иродон
Sanse: Ct
a tynn
Id jasso
High Sct
Healtard Blanch Ave
Doabcher Dr GVL01687
be La
IS 0
15421 NORTH 9TH STREET 5 em
Ballinch Lt- Save Mart
Hammer Dr Legend
Janics Burke Ave
Reliable Service Indoors/Outdoors
Reliable Coverage in Transit
• Priman Ave Orkney Dr Indoor Coverage Less Reliable
Meray Niay
toray Reliable Coverage Outdoors Only
Indoor Coverage Less Reliable
Winter ton
January 11, 2021 = Existing site
in Goat Ln
алу Soug Proposed site
miles
at&t
Project Support Statement
AT&T Mobility
Site Name: CVL01687 - Patterson 2
Location: 14521 North 9*h Street, Patterson, CA 95363
APN: 048-048-010
Introduction
AT&T Mobility is seeking to improve communications services to residences, businesses, public services, and area travelers in the City of Patterson, California. AT&T maintains a strong customer base in Patterson and constantly strives to improve coverage for both existing and potential customers. This project will expand AT&T's existing network and improve call quality, signal strength, and wireless connection services within both the City and the County, benefitting residents, travelers, public services, and roadway safety in the area.

Project Location
shearwater Of
agglo-Dra
2019 Google
Facility Design and Description
AT&T Mobility proposes the installation of a new wireless communications facility at the above-referenced address in order to improve coverage and capacity of the existing AT&T network. The facility has been designed as an 84.9' tall stealth bell tower, which will serve to provide AT&T with the necessary antenna centerline of 74' while also screening the antennas from public view. The tower, along with all of the necessary ground equipment, will be placed within a 30' × 30' ground lease area and surrounded by a 6' CMU wall with a 12' wide corrugated steel access gate.

Details of the site layout include:
• A 30' x 30' lease area enclosing:
• An 84.9' faux bell tower with antennas mounted at a centerline of 74'. • 1 walk-in equipment cabinet
• 130kw standby diesel generator with a 190 gallon fuel tank • A 6' CMU wall with a 12' corrugated steel access gate.

Please see the attached site plans, elevations and photosimulations for further information regarding the layout and nature of the proposed facility.

Location Selection and Need for Facility
AT&T seeks to improve wireless communication services in the City of Patterson and greater Stanislaus County. Presently, the targeted area of southern Patterson suffers from poor wireless coverage and low capacity levels, which can cause lack of overall network connectivity, recurring lost calls and ineffective service. The need for this proposed facility is due to complaints from AT&T customers, business, and travelers in this area. To remedy these problems, AT&T proposes this facility, which will bring improved service and capacity coverage to AT&T subscribers and emergency services in the area, as well as close the significant gap in coverage that currently exists.

Below, please see the comparison of the two maps. The first map shows the target area currently lacking wireless coverage on the AT&T network. The second map shows what the coverage will be like upon activation of the proposed facility. Please note that a significant geographic area without any indoor or transit coverage will receive significantly improved coverage following activation of the proposed facility within the targeted coverage area.

Coverage Map showing Existing Coverage
Legend
Retable Service Indoors/Outdoors
Reliable Covcrage in Transie
Indoor Courage Less Reliable
Reliable Coverage Outdoors Only
Indoor Coverege Less Reliable
Red Heatri Qi Existing site
Proposed site
October 03. 2019
Coverage Map showing Existing Coverage
Legend
Rediable Service Indoors/Outdoors
Reliable Coverage in Transie
Indoor Coverage Less Reliable
Reliable Coverage Outdoor: Only
Indoor Coverage Less Reliable
Existing site
Proposed site
1025 West Las Palmas Avenue
miles
October 03,2019
As shown in these coverage maps, a significant geographic area will benefit from the installation of this facility, particularly along the major roadways surrounding the site.

Findings

1. The requested Conditional Use is Consistent with the City of Paterson General Plan and Zoning Ordinance:

The City's General Plan provides a vision for Patterson's future, and this vision encompasses large scale residential and economic development due in significant part to "spill-over" from Bay Area expansion. It is inarguable that wireless infrastructure is a necessary and integral part of everyday life in today's day and age, and will continue to be for any contemplated future growth.

Additionally, this is a stealth facility, and while AT&T is seeking to exceed the overall height limit of the underlying zone in order to reach the necessary antenna centerline, the facility has been designed to comply with all other facets of the City of Patterson's Municipal Code.

2. The establishment, maintenance, or operation of the proposed use or structure will conform to the requirements and the intent of this title; and that such proposed use or structure will not, under the circumstances of the particular case or as conditioned, be injurious or detrimental to the health, safety, or general welfare of persons or property in the vicinity of the proposed use, or to the general welfare of the City:

This proposal will conform for all requirements of this title, and will at all times comply with all local, state and federal design, construction and safety standards.

Safety Benefits of Improved Wireless Service
AT&T offers its customers multiple services such as voice calls, text messaging, mobile email, picture/video messaging, mobile web, navigation, broadband access, V CAST, and E911 services. Mobile phone use has become an extremely important tool for first responders and serves as a back-up system in the event of a natural disaster.

Operations & Maintenance
The site is unmanned and requires no on-site personnel. Visitation to the site by a service technician for routine maintenance may occur up to once per week. The proposed site is entirely self-monitored and connected directly to a central office where sophisticated computers alert personnel to any equipment malfunction. Because the wireless facility is unmanned, there are no regular hours of operation and no impacts to existing local traffic patterns. No water or sanitation services will be required
Compliance with FCC Standards
AT&T Wireless complies with all FCC rules governing construction requirements, technical standards, interference protection, power and height limitations and radio frequency standards. An RF report has been prepared by independent licensed engineering firm Hammett & Edison, Inc., demonstrating that the ATT facility has been designed to, comply with FCC requirements. In addition, AT&T complies with all FAA rules on site location and operation.

Notice of Actions Affecting This Development Permit
In accordance with California Government Code Section 65945(a), AT&T Mobility requests notice of any proposal to adopt or amend the: general plan, specific plan, zoning ordinance, ordinance(s) affecting building or grading permits that would in any manner affect this development permit. Any such notice may be sent to 2009 V Street, Sacramento, CA 95818.

WATER & POWER
Serving Central California since 1887 (209) 883.8300 • www.tid.org 333 East Canal Drive • P O Box 949 • Turlock, CA 95381-0949 November 29, 2021
City of Patterson
Community Development - Planning Division
Attn: Lisa Ochoa
P.O. Box 667
Patterson, CA 95363
RE: Proposed Neg. Dec. #21-02 - AST&T Wireless Tower Centennial Park Dear Ms. Ochoa:

The Turlock Irrigation District (District) acknowledges the opportunity to review and comment on the referenced project. District standards require development occurring within the District's boundary that impacts irrigation and electric facilities, to meet the District's requirements.

The District has no comments concerning irrigation facilities on the subject property, as it is not within the District's irrigation service areas.

The District currently has no electric facilities on the property. The District will require the owner to install underground primary conduit, per District specifications and design, from the southeast corner of James Burke Avenue and Red Robin Drive to the to the wireless tower site on the east side of Ward Avenue.

The District has received an application from AT&T, the District fees have been paid, and we have an approved design (attached). Please inform the District should there be any City land use requirements, which would affect the District's electrical design.

The front building setback is to be a minimum of 15-feet from the property line and a minimum of 15-feet from the back-of-sidewalk to enable the safe placement of utilities.

If you have any questions concerning irrigation system requirements, please contact me at (209) 883-8367. Questions regarding electric utility requirements should be directed to David Porath at (209) 883-8659.

Sincerely,
Soft
Todd Troglin
Supervising Engineering Technician, Civil
CF: 2021049
Enclosure

DEPARTMENT OF ENVIRONMENTAL RESOURCES
Stanislaus
3800 Cornucopia Way, Suite C, Modesto, CA 95358-9492
Phone: (209) 525-6700 Fax: (209) 525-6774
County
Striving to be the Best
December 1, 2021
TO: JOEL ANDREWS, CITY OF PATTERSON, COMMUNITY DEVELOPMENT

DEPARTMENT, PLANNING DIVISION
FROM: STEPHANIE FREIER, DEPARTMENT OF ENVIRONMENTAL RESOURCES SUBJECT: ENVIRONMENTAL REFERRAL - CITY OF PATTERSON - PROPOSED NEGATIVE DECLARATION #21-02 - AT&T WIRELESS TOWER -

CENTENNIAL PARK
The Department has reviewed the information available on the proposed project and our current determination is that the project will not have a significant effect on the environment.

However, listed below are areas that still require our Department to be notified due to the scope of the project submitted:

BUSINESSES W/ HAZMAT
The applicant should contact the Department of Environmental Resources (DER) regarding appropriate permitting requirements for hazardous materials and/or wastes. Applicant and/or occupants handling hazardous materials or generating hazardous wastes must notify the Department of Environmental Resources relative to the following: (Calif. H&S, Division 20) A. Permits for the underground storage of hazardous substances at new or the modification of an existing tank facilities
B. Requirements and fees for installing aboveground storage tanks holding petroleum substances (i.e. diesel, gasoline, waste oil, new oil, etc.).

C. Requirements for registering as a handler of hazardous materials in the County.

D. Submittal of hazardous materials Business information into the California Electronic Reporting System (CERS) by handlers of materials in excess of 55 gallons, 500 pounds of a hazardous material, or of 200 cubic feet of compressed gas.

E. Generators of hazardous waste must notify the Department relative to the:
(1) quantity of waste generated; (2) plans for reducing wastes generated; and (3) proposed waste disposal practices. Generators of hazardous waste must also use the CERS data base to submit chemical and facility information to the DER.

MONITORING WELLS AND EXPLORATORY BORINGS
If the project involves the installation of monitoring wells and/or borings, the applicant must submit a current permit application for groundwater monitoring wells and exploratory borings to the Hazardous Materials Division within DER. Please contact the DER to obtain guidance on this process. If the work will be conducted within the City of Modesto, then they are the lead agency for wells and/or borings and must be contacted for their requirements.

GAVIN NEWSOM

GOVERNOR

JARED BLUMENFELD

SECRETARY FOR

ENVIRONMENTAL PROTECTION
Water Boards
Central Valley Regional Water Quality Control Board
20 December 2021
Joel Andrews
City of Patterson
1 Plaza, 2nd Floor
Patterson, CA 95363
[email protected]

COMMENTS TO REQUEST FOR REVIEW FOR THE NEGATIVE DECLARATION, AT&T WIRELESS TOWER - CENTENNIAL PARK PROJECT, SCH#2021110279,

STANISLAUS COUNTY
Pursuant to the State Clearinghouse's 18 November 2021 request, the Central Valley Regional Water Quality Control Board (Central Valley Water Board) has reviewed the Request for Review for the Negative Declaration for the AT&T Wireless Tower - Centennial Park Project, located in Stanislaus County.

Our agency is delegated with the responsibility of protecting the quality of surface and groundwaters of the state; therefore our comments will address concerns surrounding those issues.

I. Regulatory Setting
Basin Plan
The Central Valley Water Board is required to formulate and adopt Basin Plans for all areas within the Central Valley region under Section 13240 of the Porter-Cologne Water Quality Control Act. Each Basin Plan must contain water quality objectives to ensure the reasonable protection of beneficial uses, as well as a program of implementation for achieving water quality objectives with the Basin Plans. Federal regulations require each state to adopt water quality standards to protect the public health or welfare, enhance the quality of water and serve the purposes of the Clean Water Act. In California, the beneficial uses, water quality objectives, and the Antidegradation Policy are the State's water quality standards. Water quality standards are also contained in the National Toxics Rule, 40 CFR Section 131.36, and the California Toxics Rule, 40 CFR Section 131.38.

The Basin Plan is subject to modification as necessary, considering applicable laws, policies, technologies, water quality conditions and priorities. The original Basin Plans were adopted in 1975, and have been updated and revised periodically as required, using Basin Plan amendments. Once the Central Valley Water Board has adopted a Basin Plan amendment in noticed public hearings, it must be approved by the State Water Resources Control Board (State Water Board), Office of Administrative Law (OAL) and in some cases, the United States Environmental DENISE KADARA, ACTING CHAIR | PATRICK PULUPA, EXECUTIVE OFFICER 11020 Sun Center Drive #200, Rancho Cordova, CA 95670 | www.waterboards.ca.gov/centralvalley AT&T Wireless Tower - 2- 20 December 2021
- Centennial Park Project
Stanislaus County
Protection Agency (USEPA). Basin Plan amendments only become effective after they have been approved by the OAL and in some cases, the USEPA. Every three (3) years, a review of the Basin Plan is completed that assesses the appropriateness of existing standards and evaluates and prioritizes Basin Planning issues. For more information on the Water Quality Control Plan for the Sacramento and San Joaquin River Basins, please visit our website:
http://www.waterboards.ca.gov/centralvalley/water issues/basin plans/ Antidegradation Considerations
All wastewater discharges must comply with the Antidegradation Policy (State Water Board Resolution 68-16) and the Antidegradation Implementation Policy contained in the Basin Plan. The Antidegradation Implementation Policy is available on page 74 https://www.waterboards.ca.gov/centralvalley/water issues/basin plans/sacsir 2018 In part it states:

Any discharge of waste to high quality waters must apply best practicable treatment or control not only to prevent a condition of pollution or nuisance from occurring, but also to maintain the highest water quality possible consistent with the maximum benefit to the people of the State.

This information must be presented as an analysis of the impacts and potential impacts of the discharge on water quality, as measured by background concentrations and applicable water quality objectives.

The antidegradation analysis is a mandatory element in the National Pollutant Discharge Elimination System and land discharge Waste Discharge Requirements (WDRs) permitting processes. The environmental review document should evaluate potential impacts to both surface and groundwater quality.

Il. Permitting Requirements
Construction Storm Water General Permit
Dischargers whose project disturb one or more acres of soil or where projects disturb less than one acre but are part of a larger common plan of development that in total disturbs one or more acres, are required to obtain coverage under the General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Construction General Permit), Construction General Permit Order No. 2009-0009-DWQ. Construction activity subject to this permit includes clearing, grading, grubbing, disturbances to the ground, such as stockpiling, or excavation, but does not include regular maintenance activities performed to restore the original line, grade, or capacity of the facility. The Construction General Permit requires the development and implementation of a Storm Water Pollution Prevention Plan (SWPPP). For more information on the Construction General Permit, visit the State Water Resources Control Board website at:
http://www.waterboards.ca.gov/water issues/programs/stormwater/constpermits.sht ml
AT&T Wireless Tower - 3- 20 December 2021
- Centennial Park Project
Stanislaus County
Industrial Storm Water General Permit
Storm water discharges associated with industrial sites must comply with the regulations contained in the Industrial Storm Water General Permit Order No. 2014- 0057-DWQ. For more information on the Industrial Storm Water General Permit, visit the Central Valley Water Board website at:
http://www.waterboards.ca.gov/centralvalley/water issues/storm water/industrial ge neral permits/index.shtml
Clean Water Act Section 404 Permit
If the project will involve the discharge of dredged or fill material in navigable waters or wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the United States Army Corps of Engineers (USACE). If a Section 40 ermit is required by the USACE, the Central Valley Water Board will review the permit application to ensure that discharge will not violate water quality standards. If the project requires surface water drainage realignment, the applicant is advised to contact the Department of Fish and Game for information on Streambed Alteration Permit requirements. If you have any questions regarding the Clean Water Act Section 404 permits, please contact the Regulatory Division of the Sacramento District of USACE at (916) 557-5250.

Clean Water Act Section 401 Permit - Water Quality Certification If an USACE permit (e.g., Non-Reporting Nationwide Permit, Nationwide Permit, Letter of Permission, Individual Permit, Regional General Permit, Programmatic General Permit), or any other federal permit (e.g., Section 10 of the Rivers and Harbors Act or Section 9 from the United States Coast Guard), is required for this project due to the disturbance of waters of the United States (such as streams and wetlands), then a Water Quality Certification must be obtained from the Central Valley Water Board prior to initiation of project activities. There are no waivers for 401 Water Quality Certifications. For more information on the Water Quality Certification, visit the Central Valley Water Board website at:
https://www.waterboards.ca.gov/centralvalley/water issues/water quality certificatio n/
Waste Discharge Requirements - Discharges to Waters of the State If USACE determines that only non-jurisdictional waters of the State (i.e., "non- federal" waters of the State) are present in the proposed project area, the proposed project may require a Waste Discharge Requirement (WDR) permit to be issued by Central Valley Water Board. Under the California Porter-Cologne Water Quality Control Act, discharges to all waters of the State, including all wetlands and other waters of the State including, but not limited to, isolated wetlands, are subject to State regulation. For more information on the Waste Discharges to Surface Water NDES Program and WDR processes, visit the Central Valley Water Board website at: https://www.waterboards.ca.gov/centralvalley/water issues/waste to surface wat er/
AT&T Wireless Tower - 4- 20 December 2021
- Centennial Park Project
Stanislaus County
Projects involving excavation or fill activities impacting less than 0.2 acre or 400 near teet or non-jurisdictional waters of the state and projects involving dredgin! ctivities impacting less than 50 cubic yards of non-jurisdictional waters of the stat may be eligible for coverage under the State Water Resources Control Board Water Quality Order No. 2004-0004-DWQ (General Order 2004-0004). For more information on the General Order 2004-0004, visit the State Water Resources Control Board website at:
https://www.waterboards.ca.gov/board decisions/adopted orders/water quality/200 4/wqo/wqo2004-0004.pdf
Dewatering Permit
If the proposed project includes construction or groundwater dewatering to be discharged to land, the proponent may apply for coverage under State Water Board General Water Quality Order (Low Threat General Order) 2003-0003 or the Central Valley Water Board's Waiver of Report of Waste Discharge and Waste Discharge Requirements (Low Threat Waiver) R5-2018-0085. Small temporary construction dewatering projects are projects that discharge groundwater to land from excavation activities or dewatering of underground utility vaults. Dischargers seeking coverage under the General Order or Waiver must file a Notice of Intent with the Central Valley Water Board prior to beginning discharge.

For more information regarding the Low Threat General Order and the application process, visit the Central Valley Water Board website at:
http://www.waterboards.ca.gov/board decisions/adopted orders/water quality/2003/ wqo/wqo2003-0003.pdf
For more information regarding the Low Threat Waiver and the application process, visit the Central Valley Water Board website at:
https://www.waterboards.ca.gov/centralvalley/board decisions/adopted orders/waiv ers/r5-2018-0085.pdf
If you have questions regarding these comments, please contact me at (916) 464-4856 or Nicholas. [email protected].

Nir White
Nicholas White
Water Resource Control Engineer
CC: State Clearinghouse unit, Governor's Office of Planning and Research, Sacramento

PUBLIC NOTICE

THE CITY OF PATTERSON PLANNING COMMISSION

REGULAR MEETING
NOTICE IS HEREBY GIVEN that the City of Patterson Planning Commission will hold a public hearing on Thursday, January 13, 2022, at 7:00 p.m., in accordance with AB 361 (Gov. Code, § 54950 et seq.), and the Federal Americans with Disabilities Act, to consider the following:

Public Hearing: AT&T Wireless Tower - Centennial Park, Negative Declaration #21-02, APN#048-048-010
A public hearing to consider adopting a negative declaration for the construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, an 8'x8' pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in the High Density Residential Zone. Located on a site approved for a park, on the east side of Ward Avenue, approximately 500 feet north of the intersection of West Las Palmas Avenue.

NOTICE: THIS MEETING WILL BE PHYSICALLY OPEN TO THE PUBLIC. ALL MEMBERS OF

THE PUBLIC MAY ALSO PARTICIPATE IN THE MEETING VIA VIDEO CONFERENCING AND VIA ZOOM TELECONFERENCE BY CALLING 1-669-900-6833, MEETING ID: 868-5236-5893 PASSWORD: 178963 AND WILL BE GIVEN THE OPPORTUNITY TO PROVIDE PUBLIC COMMENT. JOIN FROM A PC, MAC, IPAD, IPHONE, OR ANDROID DEVICE BY USING THIS URL:
https://us06web.zoom.us/j/86852365893?pwd=LzRKRU5EZnB0WjliRVZNdkJmVHh1dz09 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the Planning Department at (209) 895-8020. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. [28 CFR 35. 102-35.104 ADA Title II].

The Planning Commission agenda and supporting public documents are available for viewing at City Hall, Planning Department, 1 Plaza, 2nd Floor, Patterson, California, during normal business hours.

The Planning Commission agenda and supporting public documents will be available on the City web site www.ci.patterson.ca.us listed under Agenda Center "Planning Commission" At the above noted time and place, testimony from interested persons will be heard by the Planning Commission and duly considered prior to making a recommendation. Any material submitted to the Planning Commission for consideration (photographs, petitions, letters, etc.) will be retained by the City and cannot be returned. If a challenge to the above application is made in court, persons may be limited to raising only those issues they or someone else raised at the Public Hearing.

Lisa Ochoa, Planning Technician II, Community Development Department