Cities Index.
The S Vision 2032_Presentation_081622_Patterson

Patterson City Council
August 16, 2022

Document
The S Vision 2032_Presentation_081622_Patterson
Meeting
August 16, 2022
Body
Patterson City Council
Original file
3.6 MB
Text extracted from the city's file for reading and search. Open the original on pattersonca.iqm2.com. That file is the official record.

The S Vision 2032
Presentation to the City of Patterson
Stanislaus Regional Transit Authority
August 16, 2022
• Integrate old StaRT and MAX routes into a cohesive network • Increase ridership on fixed-routes
• Equitable distribution of service hours in urban and rural areas • Ensure equitable service to low-income and minority
communities
• Right size the service provided in marginal areas
• Effective use of Demand Response service options
• Maintain a safety net for paratransit users
Ride The S
Service Goals and Priorities
The S Vision 2032 Project Goals
Introductions
Ride The S
Community Outreach: 22
engagements with
community and local
government
Developed Proposed
Alternatives: Based on first
round of outreach and
background data, developed
preliminary system service
recommendations
Service Guidelines:

Established quantifiable,
consistent measures to
evaluate service
effectiveness
Onboard and Online
Surveys: Documented rider
demographics, needs, and
concerns as well as
community opinions on
transit
Existing Conditions Report:

Produced from planning
documents, operations data,
and demographics
Regional Traffic Flow:

Documented through
Streetlight cellular/traffic
survey
Project Recap
Project Milestones to Date
Current Ceres Area
Ride The S
üRestructure Unproductive or Poorly Timed Routes
üExpand Service to Under-Served Areas of the
County
üImprove Service Reliability
üIncrease Service Frequency and Days of Operation
üAdd Bus Stops throughout Oakdale
üAdd Bus Shelters and Amenities
Project Recap
Early Community Feedback
• Introduce Sunday Service on All Routes
• Establish Service Frequency to 30- and 60-
minute Headways
• Add New Routes, eliminate Non-performing
Routes
• Improve Connectivity with Turlock Transit
• Develop Regional Transit Hubs in Ceres and
at Vintage Fair Mall
• Pilot weekend BART Commuter Service
Overall Service Schedule Deep Dive
Proposed System Alternatives
Proposed System
Highlights
Proposed Service Changes
Patterson, Newman, Crows
Landing
Ride The S
Patterson Service Area
Introductions
• Sunday Service • Increase Frequency to every 60
minutes from every 105 minutes
• Increase the Number of Bus Stops
and add Bus Stop Amenities
• Preserve BART and Newman
Routes by piloting new service
options
• Introduce a Redesigned Dial-A-
Ride Service option
Ride The S
Proposed Improvements
West Side Area Opportunities
Piloting Innovative BART Service
Ride The S
BART Commuter Service Pilot
• The Patterson “C” Commuter operates 1 trip in
the morning and 1 in the evening
• Meets the Modesto BART Commuter at the
joining of 132 and 580
• Passengers transfer onto the BART Commuter
• Easy Booking and Payment App
• Curb to Curb Shared Ride Bus Service
• Book 60 Minutes Prior to Desired
Travel Window
• Operate Sunday-Saturdays and
longer hours
• $2.50 one-way trip cost
• Open to the General Public Ride The S
Proposed Improvements
Patterson Dial-A-Ride
Ride The S
Timeline
• Local Agency
Presentations
• Route Testing
August
• Prepare Final
Alternatives
• Board
Presentation
September
•Route
Development
•Microtransit
Options
•Operator
Recruitment
October
• Collateral
Materials
• Operator
Recruitment
• Bus Stops
November
• Service
Change
Materials
• Local agency
Outreach
• Operator
Training
December
• Public
Outreach
• Driver
training on
new routes
• February
Launch
January
Introductions
Accepting Community Feedback Through August 15th
Review the Proposed changes at:
https://www.stanrta.org/506/The-S-Vision-2032
Submit Comments at:
https://www.stanrta.org/146/Submit-a-Comment
Ride The S
Final Plan
There’s Still Time to Get Involved
Questions
Discussion

← All documents from this meeting