NORTH AMERICA | EUROPE | AFRICA | AUSTRALIA | ASIA
WWW.FIRSTCARBONSOLUTIONS.COM
Initial Study/Addendum
KDN Property Rezone Project
City of Patterson, Stanislaus County, California
Prepared for:

City of Patterson
1 Plaza
Patterson, CA 95363
209.895.8024
Contact: Joel Andrews, City Planner
Prepared by:

FirstCarbon Solutions
1350 Treat Boulevard, Suite 380
Walnut Creek, CA 94597
925.357.2562
Contact: Mary Bean, Project Director
Grant Gruber, Project Manager
Date: August 17, 2022

THIS PAGE INTENTIONALLY LEFT BLANK
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum Table of Contents
FirstCarbon Solutions iii Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Table of Contents
Acronyms and Abbreviations.......................................................................................................iii Section 1: Introduction.................................................................................................................1

1.1 - Environmental Checklist.................................................................................................... 1

1.2 - Environmental Analysis and Conclusions............................................................................ 1

1.3 - Mitigation Monitoring Program.......................................................................................... 3 Section 2: Project Description.......................................................................................................5

2.1 - Location and Setting.......................................................................................................... 5

2.2 - Project Background ........................................................................................................... 5

2.3 - Project Characteristics....................................................................................................... 6

2.4 - Discretionary Approvals .................................................................................................... 6 Section 3: CEQA Checklist...........................................................................................................15

3.1 - Explanation of Checklist Evaluation Categories................................................................. 15

3.2 - Discussion and Mitigation Sections................................................................................... 16 I. Aesthetics, Light, and Glare .......................................................................................... 18 II. Agricultural and Forest Resources ................................................................................ 21 III. Air Quality ..................................................................................................................... 25 IV. Biological Resources...................................................................................................... 28 V. Cultural and Tribal Cultural Resources.......................................................................... 35 VI. Energy ........................................................................................................................... 39 VII. Geology, Seismicity, and Soils ....................................................................................... 40 VIII. Greenhouse Gas Emissions........................................................................................... 44 IX. Hazards and Hazardous Materials................................................................................. 46 X. Hydrology and Water Quality........................................................................................ 51 XI. Land Use and Planning.................................................................................................. 56 XII. Mineral Resources......................................................................................................... 58 XIII. Noise ............................................................................................................................. 59 XIV. Population and Housing................................................................................................ 61 XV. Public Services............................................................................................................... 63 XVI. Recreation..................................................................................................................... 66 XVII. Transportation............................................................................................................... 67 XVIII. Utilities and Service Systems ........................................................................................ 74 XIX. Wildfire.......................................................................................................................... 78 List of Exhibits
Exhibit 1: Regional Location Map ........................................................................................................... 7 Exhibit 2: Local Vicinity Map Aerial Base................................................................................................ 9 Exhibit 3: Site Photograph .................................................................................................................... 11 Exhibit 4: Proposed Parcel Map and Rezone ........................................................................................ 13

THIS PAGE INTENTIONALLY LEFT BLANK
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum Acronyms and Abbreviations
FirstCarbon Solutions iii Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx

ACRONYMS AND ABBREVIATIONS
°C degrees Celsius (Centigrade)
°F degrees Fahrenheit
µg/m3 micrograms per cubic meter
ARB California Air Resources Board
BMP Best Management Practices
CalEEMod California Emissions Estimator Model
CEQA California Environmental Quality Act
DTSC Department of Toxic Substances Control
EIR Environmental Impact Report
FMMP Farmland Mapping and Monitoring Program
LAFCo Local Agency Formation Commission
MLD Most Likely Descendant
MMRP Mitigation Monitoring and Reporting Program
mph miles per hour
NAHC Native American Heritage Commission
ND Negative Declaration
NPDES National Pollutant Discharge Elimination System
RWQCB Regional Water Quality Control Board
SWPPP Storm Water Pollution Prevention Plan
USFWS United States Fish and Wildlife Service
USGS United States Geological Survey
Valley Air District San Joaquin Valley Air Pollution Control District VOC volatile organic compounds

THIS PAGE INTENTIONALLY LEFT BLANK
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum Introduction
FirstCarbon Solutions 1 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx SECTION 1: INTRODUCTION
This Initial Study/Addendum, checklist, and attached supporting documents have been prepared to determine whether and to what extent the West Patterson Business Park Expansion Project Environmental Impact Report (EIR) (State Clearinghouse No. 2011082016) prepared for the City of Patterson remains sufficient to address the potential impacts of the proposed West Patterson Business Park Expansion Project (proposed project), or whether additional documentation is required under the California Environmental Quality Act (CEQA) (Public Resources Code [PRC] § 21000, et seq.).

1.1 - Environmental Checklist
Pursuant to Public Resources Code Section 21166, and CEQA Guidelines Sections 15162 and 15164, subd. (a), the attached Initial Study/Addendum has been prepared to evaluate the proposed project.

The attached Initial Study/Addendum uses the standard environmental checklist categories provided in Appendix G of the CEQA Guidelines, but provides answer columns for evaluation consistent with the considerations listed under CEQA Guidelines Section 15162, subd. (a).

1.2 - Environmental Analysis and Conclusions
CEQA Guidelines Section 15164, subd. (a) provides that the lead agency or a responsible agency shall prepare an Initial Study/Addendum to a previously certified Environmental Impact Report or Negative Declaration (ND) if some changes or additions are necessary but none of the conditions described in CEQA Guidelines Section 15162 calling for preparation of a subsequent EIR or ND have occurred (CEQA Guidelines, § 15164, subd. (a)).

An Addendum need not be circulated for public review but can be included in or attached to the Final EIR or ND (CEQA Guidelines § 15164, subd. (c)). The decision-making body shall consider the Initial Study/Addendum to the Certified EIR prior to making a decision on the proposed project (CEQA Guidelines § 15164, subd. (d)). An agency must also include a brief explanation of the decision not to prepare a subsequent EIR or ND pursuant to Section 15162 (CEQA Guidelines § 15164, subd. (e)).

Consequently, once an EIR or ND has been certified for a project, no subsequent EIR or ND is required under CEQA unless, based on substantial evidence:
(1) Substantial changes are proposed in the project which will require major revisions of the previous EIR or ND . . . due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 1 (2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or ND . . . due to the 1 CEQA Guidelines Section 15382 defines “significant effect on the environment” as “ . . . a substantial, or potentially substantial adverse change in any of the physical conditions within the area affected by the project, including land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic significance . . .” (PRC § 21068).

City of Patterson—KDN Property Rezone Project
Introduction Initial Study/Addendum
2 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or (3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the ND was adopted. . . shows any of the following:

A. The project will have one or more significant effects not discussed in the previous EIR or ND.

B. Significant effects previously examined will be substantially more severe than shown in the previous EIR or ND.

C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative.

D. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR or ND would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative (CEQA Guidelines, Section 15162, subd. (a); see also Pub.

Resources Code, Section 21166).

This Initial Study/Addendum, checklist, and attached documents constitute substantial evidence supporting the conclusion that preparation of a supplemental or subsequent EIR or ND is not required prior to approval of the above-referenced permits by responsible and trustee agencies, and provides the required documentation under CEQA.

This Initial Study/Addendum addresses the conclusions of the West Patterson Business Park Expansion Project EIR.

1.2.1 - Findings
There are no substantial changes proposed by the KDN Property Rezone Project or in the circumstances under which the proposed project would be implemented that would require major revisions of the West Patterson Business Park Expansion Project EIR (Certified EIR). The proposed revisions do not require preparation of a new subsequent or supplemental EIR, due to either the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. As illustrated herein, the proposed project is consistent with the previous West Patterson Business Park Expansion Project EIR and would involve only minor changes; therefore, an Initial Study/Addendum is appropriate CEQA compliance for the proposed project. Additionally, none of the mitigation measures identified in the Certified EIR apply to the KDN Property Rezone Project because no development is proposed at this time.

1.2.2 - Conclusions
The City of Patterson may approve the KDN Property Rezone Project based on this Initial Study/Addendum. The impacts of the proposed project remain within the impacts analyzed in the Certified EIR (CEQA Guidelines § 15164).

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum Introduction
FirstCarbon Solutions 3 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx

1.3 - Mitigation Monitoring Program
As required by Public Resources Code Section 21081.6, subd. (a)(1), a Mitigation Monitoring and Reporting Program (MMRP) was adopted on July 31, 2012, for the West Patterson Business Park Expansion Project. However, the MMRP is not applicable to the KDN Property Rezone Project because no development is proposed at this time.

THIS PAGE INTENTIONALLY LEFT BLANK
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum Project Description
FirstCarbon Solutions 5 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx SECTION 2: PROJECT DESCRIPTION

2.1 - Location and Setting

2.1.1 - Location
The project site consists of approximately 101.96 acres located in the western portion of the City of Patterson, Stanislaus County, California; refer to Exhibit 1. The project site is bounded by the California Aqueduct (west), the Delta-Mendota Canal (north), and the balance of the undeveloped KDN Property (east and south); refer to Exhibit 2. The project site is located on the Patterson, California, United States Geological Survey (USGS) 7.5-minute Topographic Quadrangle Map, Township 5 South, Range 7 East, Section 9 (Latitude 37 28’16; Longitude 121 10’49” West).

2.1.2 - Environmental Setting
The project site contains fallow agricultural land and unpaved roads; there are no structures within this area. The project site contains flat relief that gently slopes toward the northeast. The project site is located at an elevation of 185 above mean sea level. The California Department of Conservation Farmland Mapping and Monitoring Program (FMMP) maps the project site as “Farmland of Local Importance.”
The California Aqueduct sits on a raised embankment at a higher elevation that the project site. The Delta-Mendota Canal is at the same elevation as the project site. No safety barriers are located along the canal to prevent or deter persons or vehicles from entering the waterway.

Exhibit 3 provides a photograph of the project site.

2.1.3 - General Plan and Zoning
The project site is designated ‘General Commercial’ by both the City of Patterson General Plan and Patterson Zoning Ordinance. This land use designation and zoning district permits a range of commercial land use activities including retail, restaurant (sit-down and drive-thru), lodging, and service uses (e.g., automotive and truck).

2.2 - Project Background

2.2.1 - West Patterson Business Park Expansion Project
The Patterson City Council approved the entitlements associated with the West Patterson Business Park Expansion Project and certified the associated EIR in 2012. In 2013, Stanislaus Local Agency Formation Commission (LAFCo) approved the annexation of the property into the Patterson city limits. The West Patterson Business Park Expansion Project contemplated 13.47 million square feet of light industrial and commercial uses on 776 net acres.

City of Patterson—KDN Property Rezone Project
Project Description Initial Study/Addendum
6 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx The 2012 West Patterson Business Park Expansion Project consists of two components: the Arambel Business Park (620 net acres) and the KDN Property (156 net acres). 2 The Arambel Business Park
occupies the northern, central, and western portion of the West Patterson Business Park Expansion Project boundaries and includes the Restoration Hardware distribution center and an approved but unbuilt automobile auction facility. The KDN Property occupies the southern portion of the West Patterson Business Park Expansion Project boundaries and is undeveloped. Exhibit 2 depicts the boundaries of the KDN Property relative to the project studied in the Certified EIR. The project site for purposes of the analysis in this Addendum consists of 101.96 acres on the KDN Property as shown in Exhibit 2.

2.3 - Project Characteristics

2.3.1 - Project Summary
The project represents minor changes to the prior approvals to reflect existing market conditions.

The applicant is proposing to (1) split 101.96-acres of the KDN Property into two parcels3 (Parcel 1 and Parcel 2) and (2) change both the General Plan land use designation and zoning for Parcel 2 from ‘General Commercial’ to ‘Light Industrial,’ which would allow end users such as e-commerce, light manufacturing, research and development, and warehouse. (Parcel 1 would remain designated for General Commercial use.) The applicant’s request reflects changes in market conditions that indicate that the City of Patterson has an overabundance of undeveloped commercially zoned land. No end users have been identified for either parcel at the time of Addendum publication. Exhibit 4 depicts the proposed parcel map and rezone.

2.4 - Discretionary Approvals
The proposed project requires the following discretionary approvals from the City of Patterson • General Plan Amendment
• Rezone
• Parcel Map
2 The KDN ownership group sold its property to Baldwin Ranch Land Company LLC in July 2022. However, in the interests of avoiding confusion with the approved Baldwin North Master Plan and Baldwin Ranch Master Plan, it will be referred to as the KDN Property in this Addendum 3 Parcel 1 would total 42.08 acres and Parcel 2 would total 59.88 acres 57640001•08/2022| 1_Re gional_Location.m xd
Exhibit1
Re gionalLocation Map
Source :Census2000Data,The CaliforniaInform ation Library (CaSIL).

CITYOFPATTERSON

KDNPROPERTYREZONEPROJECT

INITALSTU DY/ADDENDU M
!
Henry Coe State Park
Stanislaus County
Stanislaus County
Santa Clara County
Merced County
Stanislaus County
San Joaquin County
Patterson
Gustine
Newman
Ceres
Modesto
Ripon
San
Joaquin
River
Crows landing
Westley
I 24,000 12,000 0 24,000
Fe e t
!
Text
Project Site
Project Site
·|þ}
·|þ}
§¨¦
·|þ}
·|þ}
·|þ}
Legend
City of Patterson
5 33
99 140
132
108

THIS PAGE INTENTIONALLY LEFT BLANK
57640001• 08/2022| 2_Local_V icin ity.mxd
Exhibit2
Local V icin ity Map
Source:Bin gAerial Imagery.

CITYOFPATTERSON

KDNPROPERTYREZONEPROJECT

INITALSTUDY/ADDENDUM
I 2,100 1,050 0 2,100
Feet
Legend
KDN Property
West Patterson Business Park Expansion Project Boundary §¨¦5
Villa
Del Lago

THIS PAGE INTENTIONALLY LEFT BLANK
57640001 • 08/2022 | 3_Site_Photograph.cdr
Exhibit 3
Site Photograph

CITY OF PATTERSON

KDN PROPERTY REZONE PROJECT

INITIAL STUDY / ADDENDUM
Source: Grant Gruber, August 2022.

THIS PAGE INTENTIONALLY LEFT BLANK
57640001 • 08/2022 | 4_Proposed_Parcel_Map_Rezone.cdr
Exhibit 4
Proposed Parcel Map And Rezone

CITY OF PATTERSON

KDN PROPERTY REZONE PROJECT

INITIAL STUDY / ADDENDUM
Source: BC Engineering Group, December 10, 2021.

Bioretention Area
Parcel Map
Proposed Change from
“General Commercial” to
“Light Industrial"

THIS PAGE INTENTIONALLY LEFT BLANK
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 15 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx SECTION 3: CEQA CHECKLIST
The purpose of the checklist is to evaluate the categories in terms of any changed condition (e.g., changed circumstances, project changes, or new information of substantial importance) that may result in a changed environmental result (e.g., a new significant impact or substantial increase in the severity of a previously identified significant effect) (CEQA Guidelines § 15162).

The questions posed in the checklist come from Appendix G of the CEQA Guidelines. A “no” answer does not necessarily mean that there are no potential impacts relative to the environmental category, but that there is no change in the condition or status of the impact since it was analyzed and addressed with mitigation measures in the Certified EIR. These environmental categories might be answered with a “no” in the checklist, since the proposed project does not introduce changes that would result in a modification to the conclusion of the previously approved CEQA document.

This Initial Study/Addendum addresses the conclusions of the West Patterson Business Park Expansion Project EIR.

3.1 - Explanation of Checklist Evaluation Categories
(1) Conclusion in West Patterson Business Park Expansion Project EIR and Related Documents
This column summarizes the conclusion of the West Patterson Business Park Expansion Project EIR and the Findings of the City in certifying the EIR and approving the project relative to the environmental issue listed under each topic. (2) Do the Proposed Changes Involve New Impacts?
Pursuant to CEQA Guidelines Section 15162, subd. (a)(1), this column indicates whether the changes represented by the revised project will result in new significant environmental impacts not previously identified or mitigated by the West Patterson Business Park Expansion Project EIR or whether the changes will result in a substantial increase in the severity of a previously identified significant impact. (3) New Circumstances Involving New Impacts?
Pursuant to CEQA Guidelines Section 15162, subd. (a)(2), this column indicates whether there have been substantial changes with respect to the circumstances under which the project is undertaken that will require major revisions to the West Patterson Business Park Expansion Project EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. (4) New Information Requiring New Analysis or Verification? Pursuant to CEQA Guidelines Section 15162, subd. (a)(3)(A-D), this column indicates whether new information of substantial importance, which was not known and could not have been City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
16 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx known with the exercise of reasonable diligence at the time the West Patterson Business Park Expansion Project EIR was certified, shows any of the following:
(A) The project will have one or more significant effects not discussed in the previous EIR or ND;
(B) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
(C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

If the additional analysis completed as part of this environmental review were to find that the conclusions of the West Patterson Business Park Expansion Project EIR remain the same and no new significant impacts are identified, or identified impacts are not found to be substantially more severe, or additional mitigation is not necessary, then the question would be answered “no” and no additional environmental document would be required. (5) Mitigation Measures Implemented or Address Impacts
Pursuant to CEQA Guidelines Section 15162, subd. (a)(3), this column indicates whether the West Patterson Business Park Expansion Project EIR provides mitigation measures to address effects in the related impact category. Any previously adopted mitigation measures will identified. The response will also address proposed revisions to previously adopted mitigation measures. These mitigation measures will be implemented with the construction of the project, as applicable. If “NA” is indicated, the Certified EIR has concluded that the impact either does not occur with this project or is not significant, and therefore no additional mitigation measures are needed.

3.2 - Discussion and Mitigation Sections
(1) Discussion
A discussion of the elements of the checklist is provided under each environmental category in order to clarify the answers. The discussion provides information about the particular environmental issue, how the project relates to the issue, and the status of any mitigation that may be required or that has already been implemented. (2) Mitigation Measures
Applicable mitigation measures from the West Patterson Business Park Expansion Project EIR that apply to the proposed project are listed under each environmental category.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 17 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx (3) Conclusions
A discussion of the conclusion relating to the analysis is contained in each section.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
18 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
I. Aesthetics, Light, and Glare
Except as provided in Public Resources Code Section 21099, would the project:
a) Have a substantial
adverse effect on a scenic
vista?
Less than
significant
impact
No No No None
b) Substantially damage
scenic resources,
including, but not limited
to, trees, rock
outcroppings, and historic
building within a State
Scenic Highway?
Less than
significant
impact
No No No None
c) In non-urbanized areas,
substantially degrade the
existing visual character
or quality of public views
of the site and its
surroundings? (Public
views are those that are
experienced from publicly
accessible vantage point).

If the project is in an
urbanized area, would
the project conflict with
applicable zoning and
other regulations
governing scenic quality?
Less than
significant
impact
No No No None
d) Create a new source of
substantial light or glare
which would adversely
affect day or nighttime
views in the area?
Less than
significant
impact
No No No None
Discussion
a) The Certified EIR found that the development of the approved business park would maintain views of the Diablo Range to the west because of topography, building height limits, setbacks from roadways and, therefore, not adversely affect views of a scenic vista. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and would rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 19 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx therefore, no adverse impacts on scenic vistas would occur. As such, the conclusions of the EIR remain unchanged.
b) The Certified EIR noted that Interstate 5 (I-5) is a designated State Scenic Highway, and the project site is visible from the freeway. The Certified EIR noted that I-5 sits on an embankment at a higher elevation that the project site and, thus, development of the business park would not obstruct views from the freeway. Furthermore, the business park’s master development plan includes design standards to break up building massing, limit buildings to no more than 45 feet above finished grade, screen parking and loading areas, and a prohibition on outdoor storage to ensure a visually compatible appearance. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no adverse impacts on state scenic highways would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR analyzed the development of 13.47 million square feet of business park uses on approximately 776 acres and, thus, would irreversibly change the visual character of the project site. The Certified EIR indicated that the City of Patterson General Plan designated the project site for light industrial and general commercial development and, thus, the development of such uses was consistent with the City’s long term planning objectives.

Furthermore, the business park’s master development plan includes design standards to break up building massing, limit buildings to no more than 45 feet above finished grade, screen parking and loading areas, and a prohibition on outdoor storage to ensure a visually compatible appearance. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no adverse impacts on visual character would occur. As such, the conclusions of the Certified EIR remain unchanged.
d) The Certified EIR indicated that development of the business park would introduce new exterior sources of light and glare including streetlights, parking lot lights, and illuminated signage. The business park’s master development plan includes design standards for lighting that include the use of cut-off fixtures, shielding, and require all lighting to be directed downward. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new sources of light and glare would be introduced. As such, the conclusions of the EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
20 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Mitigation Measures
None.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 21 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
II. Agricultural and Forest Resources
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the State’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project:
a) Convert Prime
Farmland, Unique
Farmland, or Farmland
of Statewide
Importance (Farmland),
as shown on the maps
prepared pursuant to
the Farmland Mapping
and Monitoring
Program of the
California Resources
Agency, to
nonagricultural use?
Significant
unavoidable
impact
No No No None
b) Conflict with existing
zoning for agricultural
use, or a Williamson Act
Contract?
Less than
significant
impact with
mitigation
incorporated
No No No MM AG-2
c) Conflict with existing
zoning for, or cause
rezoning of, forest land
(as defined in Public
Resources Code Section
12220(g)), timberland
(as defined by Public
Resources Code Section
4526), or timberland
zoned Timberland
Production (as defined
by Government Code
Section 51104(g))?
No impact No No No None
d) Result in the loss of
forest land or
conversion of forest
land to non-forest use?
No impact No No No None
City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
22 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
e) Involve other changes in
the existing
environment which, due
to their location or
nature, could result in
conversion of Farmland,
to nonagricultural use or
conversion of forest
land to non-forest use?
Less than
significant
impact with
mitigation
incorporated
No No No MM AG-3
Discussion
a) The Certified EIR found that buildout of the business park would result in the conversion of up to 1,108.69 acres of Important Farmland to nonagricultural use. The Certified EIR set forth Mitigation Measure AG-1, which required the preservation of an equivalent amount of converted farmland; however, that mitigation measure was found to be infeasible and stricken in the Final EIR Errata. As such, the Certified EIR concluded that impacts would be significant and unavoidable.

The KDN Property contains fallow farmland and is mapped as Farmland of Local Importance by the California Department of Conservation. Farmland of Local Importance does not fall under the Important Farmland umbrella. Regardless, the proposed project would split the KDN Property into two parcels and rezone one of them to Light Industrial use. No new development would occur and, thus, no farmland would be converted to nonagricultural use. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR indicated that the project site contained cultivated agricultural uses and two parcels were encumbered by active Williamson Act contracts, which were set to expire at the end of 2012 and 2014, respectively. The Certified EIR set forth Mitigation Measure AG-2, which required payment of the Williamson Act cancellation fee if they had not expired at the time of final map recordation. The Certified EIR also indicated that the project site was zoned “General Agriculture – 40 Acre Minimum” by the Stanislaus County Zoning Ordinance, an agricultural zoning district. The Certified EIR noted that the proposed project would prezone the site to “General Commercial” and “Light Industrial,” which would resolve any conflicts with existing zoning. The Certified EIR concluded that impacts would be less than significant.

The KDN Property was not encumbered by either of the two Williamson Act contracts.

Moreover, both contracts have expired, which eliminates any possibility of conflicts with an active Williamson Act contract. Hence, Mitigation Measure AG-2 is no longer applicable and does not apply. The KDN Property is currently zoned “General Commercial” and a portion is proposed to be rezoned to “Light Industrial.” Both of these zoning districts are nonagricultural City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 23 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx in nature. No conflicts with Williamson Act contracts or agricultural zoning would occur. As such, the conclusions of the Certified EIR remain unchanged. c-d) The Certified EIR indicated that the project site contained cultivated agricultural uses and did not support commercially harvestable stands of trees. The Certified EIR also indicated that the project site was zoned “General Agriculture – 40 Acre Minimum” by the Stanislaus County Zoning Ordinance, a non-forest zoning district. Thus, no forestland would be converted to nonforest use and no conflicts with forest zoning would occur. The Certified EIR concluded that no impact would occur.

The KDN Property contains fallow agricultural land and is zoned “General Commercial” by the Patterson Zoning Ordinance. The proposed project involves rezoning a portion of this property to “Light Industrial,” a non-forest zoning district. Thus, no forestland would be converted to non-forest use and no conflicts with forest zoning would occur. As such, the conclusions of the Certified EIR remain unchanged.
e) The Certified EIR found that buildout of the business park would create pressures to convert surround agricultural land to nonagricultural use. The Certified EIR set forth Mitigation Measure AG-3, which required the establishment of 150-foot buffers between the business park and agricultural land in unincorporated Stanislaus County zoned A-2. The Certified EIR concluded that impacts would be less than significant with mitigation.

The KDN Property is located in the Patterson city limits and is entirely surrounded by land within the city limits. As such, it does not abut any agricultural land in unincorporated Stanislaus County zoned A-2. Thus, Mitigation Measure AG-3 would not apply. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM AG-2 In the event that the Williamson Act contracts that encumber Assessor’s Parcel Nos. 021-025-020 or 021-025-026 have not expired at the time of recordation of the first final map, the project applicant shall pay the Williamson Act contract cancellation fee as determined by the Stanislaus County Assessor’s Office. This mitigation measure does not apply if both Williamson Act contracts have expired prior to recordation of the final map. [This mitigation measure is no longer applicable and does not apply to the proposed project]
MM AG-3 Prior to recordation of the final maps that adjoin lands in unincorporated Stanislaus County, the project applicant shall prepare and submit plans to the City of Patterson demonstrating that 150-foot minimum setbacks have been established between the proposed project and all agricultural lands in unincorporated Stanislaus County zoned General Agriculture (A-2). Pursuant to the County’s policy, permitted uses within the setback may include public roadways, utilities, drainage facilities, rivers and adjacent riparian areas, landscaping, parking lots, and similar low-peopleintensive uses. Permitted uses may also include nonagricultural uses adjoining or City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
24 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx surrounding a project site (including but not limited to legal, non-conforming uses and home sites) that are of a permanent nature and are not likely to be returned to agriculture. Landscaping within a buffer setback area shall be designed to exclude turf areas that could induce activities and add to overall maintenance costs and water usage. [This mitigation measure does not apply to the proposed project] Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 25 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
III. Air Quality
Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project:
a) Conflict with or obstruct
implementation of the
applicable air quality
plan?
Significant
unavoidable
impact
No No No MMs AIR-3a,
AIR-3b, PSU6a, PSU-6b,
TRANS-6
b) Result in a cumulatively
considerable net
increase of any criteria
pollutant for which the
project region is
nonattainment under an
applicable federal or
State ambient air quality
standard?
Significant
unavoidable
impact
No No No MMs AIR-3a,
AIR-3b
c) Expose sensitive
receptors to substantial
pollutant
concentrations?
Less than
significant
impact
No No No None
d) Result in other
emissions (such as those
leading to odors or)
adversely affecting a
substantial number of
people?
Less than
significant
impact with
mitigation
incorporated
No No No MM AIR-5
Discussion
a) The Certified EIR found that buildout of the business park would result in criteria pollutant emissions that exceed San Joaquin Valley Air Pollution Control District (Valley Air District) thresholds. The Certified EIR set forth Mitigation Measures AIR-3a, AIR-3b, PSU-6a, PSU-6b, and TRANS-6, which required various types of emission reduction measures to be implemented during construction and operations. However, the mitigation measures would not reduce project-related emissions to below Valley Air District thresholds and, therefore, the project is inconsistent with the agency air quality management plan. As such, the Certified EIR concluded that impacts would be significant and unavoidable. A statement of overriding considerations was adopted prior to project approval.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 from ‘General Commercial’ to ‘Light Industrial.’ No new construction would occur as a result of City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
26 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx these actions and, therefore, no new criteria pollutant emissions would be emitted. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR found that buildout of the business park would result in criteria pollutant emissions that exceed Valley Air District thresholds. The Certified EIR set forth Mitigation Measures AIR-3a, AIR-3b, PSU-6a, PSU-6b, and TRANS-6, which required various types of emission reduction measures to be implemented during construction and operations.

However, the mitigation measures would not reduce project-related emissions to below Valley Air District thresholds. As such, the Certified EIR concluded that impacts would be significant and unavoidable.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 from ‘General Commercial’ to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new criteria pollutant emissions would be emitted. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR found that buildout of the business park would result in new sources of toxic air contaminants including diesel particulate matter and ground-disturbing activities could result in exposure to Valley Fever. Emissions modeling showed that toxic air contaminant concentrations at the nearest sensitive receptor would be within acceptable levels.

Furthermore, implementation of standard dust abatement measures in accordance with Valley Air District Regulation VIII would limit Valley Fever exposure. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 from ‘General Commercial’ to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new toxic air contaminant emissions would be emitted or a net increase in Valley Fever exposure would occur. As such, the conclusions of the Certified EIR remain unchanged.
d) The Certified EIR found that buildout of the business park would result in new sources of objectionable odors from an on-site wastewater treatment plant. The Certified EIR set forth Mitigation Measure AIR-5, which required an odor management plan to be prepared and implemented. The on-site wastewater treatment plant was subsequently eliminated from this project. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 from ‘General Commercial’ to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new sources of odors would be introduced. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM AIR-3a Prior to issuance of building permits for each use, the project applicant shall demonstrate compliance with all applicable requirements of San Joaquin Valley Air City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 27 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Pollution Control District, Rule 9510 via the submittal of a Rule 9510 Implementation Plan to the City of Patterson for review and approval. The implementation plan shall achieve a 33 percent reduction in NOX and a 45 percent reduction in PM10 over the first 10 years of operations through the use of on-site emissions reduction measures or through the payment of off-site mitigation fees to the SJVAPCD [Valley Air District] for purchase of emission reductions. The requirements of the approved implementation plan shall be incorporated into the proposed project.

MM AIR-3b Prior to issuance of building permits for any use that would receive 10 or more truck deliveries per week, the project applicant shall demonstrate that the following antiidling measures would be implemented:
• Provide available electricity hookups for trucks in the loading dock areas. • Signs shall be posted in dock areas advising drivers of the maximum allowable idling time in accordance with California Air Resources Board regulations. • Telephone numbers of the building facilities manager and the California Air Resources Board shall be posted on signs at truck entrances to report idling violations.

MM AIR-5 Prior to commencement of on-site wastewater treatment plant operations, the project applicant shall prepare and submit a plan outlining Odor Control Best Management Practices to the City of Patterson and the San Joaquin Valley Air Pollution Control District for review and approval. The plan shall identify measures and practices that would prevent or minimize the release of objectionable odors from plant operations. The approved plan shall be incorporated into the proposed project.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
28 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
IV. Biological Resources
Would the project:
a) Have a substantial
adverse effect, either
directly or through
habitat modifications,
on any species identified
as a candidate,
sensitive, or specialstatus species in local or
regional plans, policies,
or regulations, or by the
California Department
of Fish and Wildlife or
United States Fish and
Wildlife Service?
Less than
significant
impact with
mitigation
incorporated
No No No MMs BIO-1a,
BIO-1b, BIO1c, BIO-1d,
BIO-1e
b) Have a substantial
adverse effect on any
riparian habitat or other
sensitive natural
community identified in
local or regional plans,
policies, and regulations
or by the California
Department of Fish and
Wildlife or United States
Fish and Wildlife
Service?
Less than
significant
impact with
mitigation
incorporated
No No No MM BIO-2
c) Have a substantial
adverse effect on State
or federally protected
wetlands (including, but
not limited to, marsh,
vernal pool, coastal,
etc.) through direct
removal, filling,
hydrological
interruption, or other
means?
Less than
significant
impact with
mitigation
incorporated
No No No MM BIO-2
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 29 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
d) Interfere substantially
with the movement of
any native resident or
migratory fish or wildlife
species or with
established native
resident or migratory
wildlife corridors, or
impede the use of
wildlife nursery sites?
Less than
significant
impact with
mitigation
incorporated
No No No MM BIO-4
e) Conflict with any local
policies or ordinances
protecting biological
resources, such as a tree
preservation policy or
ordinance?
Less than
significant
impact with
mitigation
incorporated
No No No MMs BIO-1a,
BIO-1b, BIO1c, BIO-1d,
BIO-1e, BIO-2,
BIO-4
f) Conflict with the
provisions of an
adopted Habitat
Conservation Plan,
Natural Community
Conservation Plan, or
other approved local,
regional, or State
habitat conservation
plan?
No impact No No No None
Discussion
a) The Certified EIR found that buildout of the business park would result in potential impacts on special-status wildlife species. The Certified EIR set forth Mitigation Measures BIO-1a, BIO-1b, BIO-1c, BIO-1d, and BIO-1e, which required various pre-construction surveys and species protection measures. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts on special-status species would occur. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR found that buildout of the business park would result in potential impacts on riparian habitat as a result of the construction of a new bridge over Del Puerto Creek. The Certified EIR set forth Mitigation Measure BIO-2, which required compliance with permitting City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
30 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx requirements. The Certified EIR concluded that impacts would be less than significant with mitigation.

The KDN Property is 1.3 miles from Del Puerto Creek. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ Construction of a new bridge over Del Puerto Creek would be required and would be in constructed in substantially the same manner as analyzed in the Certified EIR. No new or additional construction (including bridge construction) would occur as a result of these actions and, therefore, no new impacts on riparian habitat would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR found that buildout of the business park would result in potential impacts on wetlands as a result of the construction of a new bridge over Del Puerto Creek. The Certified EIR set forth Mitigation Measure BIO-2, which required compliance with permitting requirements. The Certified EIR concluded that impacts would be less than significant with mitigation.

The KDN Property is 1.3 miles from Del Puerto Creek. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new or additional construction (including bridge construction) would occur as a result of these actions and, therefore, no new impacts on wetlands would occur. As such, the conclusions of the Certified EIR remain unchanged.
d) The Certified EIR found that buildout of the business park would result in potential impacts on wildlife movement as a result of develop near Del Puerto Creek including the construction of a new bridge. The Certified EIR set forth Mitigation Measure BIO-4, which requires a 100-foot setback from the creek for new development. The Certified EIR concluded that impacts would be less than significant with mitigation.

The KDN Property is 1.3 miles from Del Puerto Creek. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction (including bridge construction) would occur as a result of these actions and, therefore, no new impacts on wildlife movement would occur. As such, the conclusions of the Certified EIR remain unchanged.
e) The Certified EIR found that buildout of the business park would result in potential conflicts with locally adopted biological ordinances and policies. The Certified EIR set forth Mitigation Measures BIO-1a, BIO-1b, BIO-1c, BIO-1d, BIO-1e, BIO-2, and BIO-4 which required various preconstruction surveys and species protection measures. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new conflicts with locally adopted biological ordinances and policies would occur.

As such, the conclusions of the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 31 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx f) The Certified EIR found that the business park project site is not within the boundaries of an adopted conservation plan. This condition precludes the possibility of conflicts with such a plan. The Certified EIR concluded that no impact would occur.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction (including bridge construction) would occur as a result of these actions and, therefore, no conflicts with a conservation plan would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM BIO-1a No more than 14 days prior to ground-disturbing activities that occur within the nesting season (typically from mid-February to mid-September), a qualified biologist shall perform a pre-construction survey for burrowing owl, loggerhead shrike, or nesting migratory birds active within the project site and within a 200-foot buffer of the project site to determine the presence or absence of these species. If these species are determined to be present, the applicant shall follow the guidelines outlined by the California Department of Fish and Game and/or the U.S. Fish and Wildlife Service:
• If burrowing owls are found on-site during the nesting season (February 1 to August 31), they shall be avoided by a 250-foot work-free buffer until it has been determined by a qualified biologist that the young have fledged and are independent of their parents. The 250-foot week-free buffer will be clearly defined (e.g., with orange construction fencing), and a biological monitor will visit the site randomly throughout the breeding season to ensure the area remains work-free and the owls are not negatively affected by construction activities. • If loggerhead shrike or any other migratory birds are found nesting on-site, a 50- foot work-free buffer area will be established and monitored by a qualified biologist until young have fledged and are independent of their parents. Again, nests and work-free buffers would be monitored.
• If burrowing owls occur on the project area during the wintering season (September 1 to January 31), and construction is slated to begin during this time and active burrows cannot be avoided, an eviction of owls can be conducted to ensure owls move off the site prior to commencement of construction. The eviction process includes the installation of one-way doors that remain in all burrows of suitable size for at least 3 days, monitored by a qualified biologist, and then hand-excavating burrows to ensure no owl remains in the burrow. Once the site is clear of owls, the burrows can be backfilled, after which ground-disturbing construction activity can commence.
• In the unlikely event burrowing owls are found on-site, mitigation lands must be purchased to offset the loss of their habitat. The standard mitigation lands required to loss of habitat is 6.5 acres for every pair of owls found on-site.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
32 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx MM BIO-1b No more than 14 days prior to ground-disturbing activities during the breeding season (February 1 to August 31), a qualified biologist shall perform preconstruction surveys for the Swainson’s hawk in accordance with the Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in California’s Central Valley. In accordance with the guidelines, surveys shall occur within a 0.5-mile radius of the site, and shall involve a minimum of two survey periods. In the event that one or more Swainson’s hawks are observed to be nesting, a work-free buffer area shall be established and monitored by a qualified biologist. The biologist shall have the discretion to determine the appropriate buffer, which may involve consultation with the California Department of Fish and Game, as appropriate. The biologist shall determine when the nest has been vacated, at which point, the work-free buffer area can be removed.

MM BIO-1c Prior to issuance of grading permits, the applicant shall provide documentation to the City of Patterson demonstrating that Swainson’s hawk foraging habitat mitigation has been obtained at a ratio of 0.50 acre for each 1.00 acre of suitable foraging habitat developed. “Suitable foraging habitat” consists of row crops or fallow fields that would be affected by construction activities. Land planted as orchards shall not be treated as suitable foraging habitat pursuant to the guidance in the Mitigation Guidelines for Swainson’s Hawk. The applicant shall mitigate for the loss of Swainson’s hawk foraging habitat through (1) payment of $600 per acre for off-site preservation of foraging habitat to a resource agency or a third-party organization acceptable to a resource agency or (2) acquisition of an irrevocable instrument (e.g., deed restriction or easement) for preservation of foraging habitat on a property that provides habitat of equal or greater quality. This mitigation measure may be coordinated with Mitigation Measure AG-1.

MM BIO-1d The project applicant shall adhere to the following requirements to avoid or minimize adverse impacts on the San Joaquin kit fox:
• No more than 14 days prior to the first ground-disturbing activity, a qualified biologist shall thoroughly walk the project site, as well as a 200-foot buffer around the perimeter of the project site, to locate potential San Joaquin kit fox dens. If no dens are located, no further surveys efforts are required. If dens are located during this survey effort, the status of the dens shall be assessed and the USFWS and CDFG shall be consulted.
• All vehicles operating within the construction area shall observe a maximum 20- mph speed limit.
• All ground-disturbing construction activities shall occur during daylight hours. • All excavated, steep-walled holes or trenches more than 2 feet deep shall be covered at the close of each work day or shall have escape ramps constructed of earth fill or wooden planks installed. Before such holes or trenches are filled, they shall be thoroughly inspected for trapped animals. If an animal is found within these structures, the animal shall be allowed to leave on its own without harm or harassment.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 33 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx • All construction piles, culverts, or similar structures with a diameter of 4 inches or greater that are stored at the construction site shall be thoroughly inspected for animals prior to burial, capping, or moving. If a kit fox is found within any of these structures, the structure shall remain untouched until the kit fox has vacated the structure; if necessary, the USFWS and CDFG shall be consulted. • All food-related trash shall be disposed of in closed containers and removed from the construction site at a minimum of once per week.
• Prior to the first ground-disturbing activity, a qualified biologist shall conduct an employee education program for construction personnel. The education program shall include a physical description of the kit fox, methods of impact avoidance, and points of contact should an impact occur or potentially occur. A fact sheet covering all of this information shall be provided to each employee. • The applicant shall establish a point of contact for construction personnel in the event that a kit fox is accidentally injured or killed. • Prior to ground-disturbing activities, the City shall retain a qualified biologist to conduct periodic inspections of the project site during construction to ensure compliance with the above measures.
• The CDFG shall be notified immediately and the Sacramento Fish and Wildlife office shall be notified within 3 days if a kit fox is injured or killed.

MM BIO-1e Prior to removal of any trees (including orchard and ornamental) or structures (barns) on the project site, the project applicant shall retain a qualified biologist to conduct presence/absence surveys for bat species. Bats shall not be disturbed during the breeding season (typically between May and August), or when using a winter hibernaculum (typically between November and February). If bats are found to be present in trees on-site, systematic removal of select tree branches would be required several days prior to the removal of the trees. This work shall be done under the supervision of a qualified biologist. If bats are found to be present in structures, partial removal of the roof shall be required within several days of building demolition. This work shall be conducted under the supervision of a qualified biologist.

MM BIO-2 Prior to issuance of grading permits for construction activities that would occur within 100 feet of Del Puerto Creek, the project applicant shall retain a qualified biologist to prepare and submit a Jurisdictional Delineation to the appropriate resource agencies for review and approval. Such agencies may include but are not limited to the United States Army Corps of Engineers, the California Department of Fish and Game, and the Central Valley Regional Water Quality Control Board. Should the approved Jurisdictional Delineation determine that the project would impact regulated resources, the applicant shall obtain the necessary regulatory permits and mitigate impacts through (1) avoidance of the resources; (2) off-site restoration of features of equal or greater value; or (3) purchase of credits at an agency-approved mitigation bank in the region at no less than a 1:1 ratio.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
34 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx MM BIO-4 Prior to recordation of the final map for the proposed project, the project applicant shall prepare and submit plans to the City of Patterson that demonstrate that physical improvements associated with the proposed project maintain a minimum 100-foot setback from the Del Puerto Creek high water mark, or outside edge of existing riparian vegetation, whichever is greater. Stream crossings are exempt from this setback requirement; however, they must either (1) completely span the creek channel, where feasible; or (2) where a span is not feasible, footings must be located as far away from the creek’s low-flow channel as feasible. Utility improvements are also exempt from this setback requirement.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 35 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
V. Cultural and Tribal Cultural Resources
Would the project:
a) Cause a substantial
adverse change in the
significance of a
historical resource as
pursuant to Section
15064.5?
Less than
significant
impact with
mitigation
incorporated
No No No MM CUL-1
b) Cause a substantial
adverse change in the
significance of an
archaeological resource
pursuant to Section
15064.5?
Less than
significant
impact with
mitigation
incorporated
No No No MM CUL-1
c) Disturb any human
remains, including those
interred outside of
formal cemeteries?
Less than
significant
impact with
mitigation
incorporated
No No No MM CUL-4
Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
d) Listed or eligible for
listing in the California
Register of Historical
Resources, or in a local
register of historical
resources as defined in
Public Resources Code
Section 5020.1(k), or
N/A No No No None
e) A resource determined
by the lead agency, in its
discretion and
supported by
substantial evidence, to
be significant pursuant
to criteria set forth in
subdivision (c) of Public
Resources Code Section
5024.1. In applying the
criteria set forth in
subdivision (c) of Public
Resource Code Section
N/A No No No None
City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
36 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
5024.1, the lead agency
shall consider the
significance of the
resource to a California
Native American tribe.

Discussion
Cultural Resources
a) The Certified EIR found that buildout of the business park would result in potential impacts on undiscovered historic resources. The Certified EIR set forth Mitigation Measure CUL-1, which required inadvertent discovery measures to be implemented in the event such resources are encountered. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts on historic resources would occur. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR found that buildout of the business park would result in potential impacts on undiscovered archaeological resources. The Certified EIR set forth Mitigation Measure CUL-1, which required inadvertent discovery measures to be implemented in the event such resources are encountered. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts on archaeological resources would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR found that buildout of the business park would result in potential impacts on undiscovered human remains. The Certified EIR set forth Mitigation Measure CUL-4, which required inadvertent discovery measures to be implemented in the event such resources are encountered. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 37 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx therefore, no new impacts on human remains would occur. As such, the conclusions of the Certified EIR remain unchanged.

Tribal Cultural Resources
d-e) Tribal cultural resources was not on the CEQA Appendix G Checklist when the Certified EIR was prepared. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts on tribal cultural resources would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM CUL-1 If a potentially significant cultural resource is encountered during subsurface earthwork activities for the project, all construction activities within a 50-foot radius of the find shall cease until a qualified archaeologist determines whether the resource requires further study. The applicant shall include a standard inadvertent discovery clause in every construction contract to inform contractors of this requirement. Any previously undiscovered resources found during construction shall be evaluated for significance in terms of California Environmental Quality Act criteria by a qualified archaeologist and if significant, recorded on appropriate California Department of Parks and Recreation forms. Potentially significant cultural resources consist of but are not limited to stone, bone, glass, ceramics, fossils, wood, or shell artifacts, or features including hearths, structural remains, or historic dumpsites. If the resource is determined significant under CEQA, the qualified archaeologist shall prepare and implement a research design and archaeological data recovery plan that will capture those categories of data for which the site is significant. The archaeologist shall also conduct appropriate technical analyses, prepare a comprehensive report and file it with the appropriate Information Center, and provide for the permanent curation of the recovered materials.

MM CUL-4 In the event of the accidental discovery or recognition of any human remains, all activities must cease within 50 feet of the find and the following procedures shall be implemented, as applicable:

1. There shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until the Stanislaus County Coroner is contacted to determine if the remains are Native American and if an investigation of the cause of death is required. If the coroner determines the remains to be Native American, the coroner shall contact the Native American Heritage Commission (NAHC) within 24 hours, and the NAHC shall identify the person or persons it believes to be the “most likely descendant” (MLD) of the deceased Native American. The MLD may make recommendations to the landowner or the person responsible for the excavation work within 48 hours, for means of treating or disposing of, with appropriate dignity, the human City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
38 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx remains and any associated grave goods as provided in Public Resources Code Section 5097.98.

2. Where the following conditions occur, the landowner or his authorized representative shall rebury the Native American human remains and associated grave goods with appropriate dignity either in accordance with the recommendations of the most likely descendant or on the project site in a location not subject to further subsurface disturbance:
• The NAHC is unable to identify a most likely descendant or the most likely descendant failed to make a recommendation within 48 hours after being notified by the commission.
• The descendant identified fails to make a recommendation. • The landowner or his authorized representative rejects the recommendation of the descendant, and mediation by the NAHC fails to provide measures acceptable to the landowner.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 39 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
VI. Energy
Would the project:
a) Result in potentially
significant
environmental impact
due to wasteful,
inefficient, or
unnecessary
consumption of energy
resources, during
project construction or
operation?
N/A No No No None
b) Conflict with or obstruct
a State or local plan for
renewable energy or
energy efficiency?
N/A No No No None
Discussion
a-b) The Certified EIR found that energy consumption resulting from the proposed project would not be considered inefficient, unnecessary, or wasteful as defined by Appendix F of the CEQA Guidelines. As such, the Certified EIR concluded that energy impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 from ‘General Commercial’ to ‘Light Industrial.’ No additional or new construction beyond that analyzed in the approved Business Park would occur as a result of these actions; therefore, no new energy impacts would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
None.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
40 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
VII. Geology, Seismicity, and Soils
Would the project:
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i) Rupture of a known
earthquake fault, as
delineated on the
most recent AlquistPriolo Earthquake
Fault Zoning Map
issued by the State
Geologist for the area
or based on other
substantial evidence
of a known fault?
Refer to Division of
Mines and Geology
Special Publication 42.

Less than
significant
impact with
mitigation
incorporated
No No No MM GEO-1
ii) Strong seismic ground
shaking?
Less than
significant
impact with
mitigation
incorporated
No No No MM GEO-1
iii) Seismic-related
ground failure,
including
liquefaction?
Less than
significant
impact with
mitigation
incorporated
No No No MM GEO-1
iv) Landslides? Less than
significant
impact
No No No None
b) Result in substantial soil
erosion or the loss of
topsoil?
Less than
significant
impact with
mitigation
incorporated
No No No MM HYD-1
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 41 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
c) Be located on a geologic
unit or soil that is
unstable, or that would
become unstable as a
result of the project, and
potentially result in on- or
off-site landslide, lateral
spreading, subsidence,
liquefaction or collapse?
Less than
significant
impact with
mitigation
incorporated
No No No MM GEO-1
d) Be located on expansive
soil, as defined in Table
18-1-B of the Uniform
Building Code (1994),
creating substantial direct
or indirect risks to life or
property?
Less than
significant
impact with
mitigation
incorporated
No No No MM GEO-1
e) Have soils incapable of
adequately supporting
the use of septic tanks or
alternative wastewater
disposal systems where
sewers are not available
for the disposal of
wastewater?
No impact No No No None
f) Directly or indirectly
destroy a unique
paleontological resource
or site or unique geologic
feature?
Less than
significant
impact with
mitigation
incorporated
No No No MM CUL-3
Discussion
a) The Certified EIR found that buildout of the business park would result in potential exposure to seismic hazards such as strong ground shaking and liquefaction. The Certified EIR set forth Mitigation Measure GEO-1, which required compliance with the California Building Standards Code seismic design standards. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with seismic hazards would occur. As such, the conclusions of the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
42 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx b) The Certified EIR found that buildout of the business park would result in potential cause erosion and sedimentation. The Certified EIR set forth Mitigation Measure HYD-1, which required implementation of stormwater pollution prevention measures. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with erosion would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR found that buildout of the business park would result in potential exposure to unstable geologic units or soils. The Certified EIR set forth Mitigation Measure GEO-1, which required compliance with the California Building Standards Code seismic design standards. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with unstable geologic units or soils would occur. As such, the conclusions of the Certified EIR remain unchanged. d) The Certified EIR found that buildout of the business park would result in potential exposure to expansive soils. The Certified EIR set forth Mitigation Measure GEO-1, which required compliance with the California Building Standards Code grading and soil engineering standards.

The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with expansive soils would occur. As such, the conclusions of the Certified EIR remain unchanged.
e) The Certified EIR indicated that the business park would be served with municipal sanitary sewer service provided by the City of Patterson. No septic or alternative wastewater systems would be employed. The Certified EIR concluded that no impact would occur.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with septic or alternative wastewater systems would occur. As such, the conclusions of the Certified EIR remain unchanged. f) The Certified EIR found that buildout of the business park may result in the inadvertent discovery of paleontological resources. The Certified EIR set forth Mitigation Measure CUL-3, which required implementation of inadvertent discovery measures in the event of a find. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 43 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx therefore, no new impacts associated with paleontological resources would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM GEO-1 Prior to the issuance of building permits for each building within the project site, the project applicant shall submit a geotechnical study and building plans to the City of Patterson for review and approval. The design-level geotechnical study shall be prepared by a qualified engineer and shall identify grading and building practices necessary to ensure stable building conditions, including the abatement of expansive soil conditions on the project site. The project applicant shall implement the recommendations of the approved geotechnical study into project plans. The project’s building plans shall demonstrate that they incorporate all applicable recommendations of the geotechnical study and comply with all applicable requirements of the latest adopted version of the California Building Standards Code. A licensed professional engineer shall prepare the plans, including those that pertain to soil engineering, structural foundations, pipeline excavation, and installation. The approved plans shall be incorporated into the proposed project. All on-site soil engineering activities shall be conducted under the supervision of a licensed Geotechnical Engineer or Certified Engineering Geologist.

MM CUL-3 In the event a fossil or fossil formations are discovered during any subsurface construction activities for the proposed project, all excavations within 100 feet of the find shall be temporarily halted until the find is examined by a qualified paleontologist, in accordance with Society of Vertebrate Paleontology standards. The paleontologist shall notify the City of Patterson, who shall coordinate with the paleontologist concerning any necessary investigation of the find. If the find is determined to be significant under CEQA, the City, based on the recommended mitigation measures of the qualified paleontologist, shall require the applicant to implement those measures, which may include avoidance, preservation in place, or other appropriate measures, as outlined in Public Resources Code Section 21083.2.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
44 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
VIII. Greenhouse Gas Emissions
Would the project:
a) Generate greenhouse
gas emissions, either
directly or indirectly,
that may have a
significant impact on the
environment?
Less than
significant
impact with
mitigation
incorporated
No No No MMs AIR-3b,
AIR-6a, AIR-6b,
PSU-3, TRANS6
b) Conflict with any
applicable plan, policy
or regulation adopted
for the purpose of
reducing the emissions
of greenhouse gases?
Less than
significant
impact with
mitigation
incorporated
No No No MMs AIR-3b,
AIR-6a, AIR-6b,
PSU-3, TRANS6
Discussion
a-b) The Certified EIR found that buildout of the business park would result in new greenhouse gas emissions Valley Air District required projects to achieve a 29 percent reduction relative to Business As Usual. The Certified EIR set forth Mitigation Measures AIR-3b, AIR-6a, AIR-6b, PSU3, and TRANS-6, which required various types of emission reduction measures to be implemented during operations. These measures would achieve a 36.5 percent reduction in greenhouse gas emissions and, thus, achieve the minimum 29 percent reduction. As such, the Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 from ‘General Commercial’ to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new greenhouse gas emissions would be emitted. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM AIR-6a Prior to issuance of building permits for each project use, the project applicant shall prepare and submit plans to the City of Patterson for review and approval demonstrating that Energy Star-rated roof materials or equivalent would be installed on all roofed facilities. Energy Star-rated roof specifications include:
• Metal roofing products
• Roof tiles
• Spray polyurethane foam roof systems
• Asphalt shingles
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 45 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx • Single-ply membranes
• Roof coating products, and
• Modified bitumen.

MM AIR-6b Prior to issuance of building permits for each project use, the applicant shall prepare and submit documentation to the City of Patterson for review and approval demonstrating that energy efficiency measures have been incorporated to result in an increased efficiency above Title 24 requirements. The applicant shall maintain a record of efficiency calculations for each proposed building, and demonstrate to the City of Patterson that each phase of the project shall achieve a minimum 5 percent increase of efficiency over the latest adopted edition of the Title 24 standards.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
46 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
IX. Hazards and Hazardous Materials
Would the project:
a) Create a significant
hazard to the public or
the environment
through the routine
transport, use, or
disposal of hazardous
materials?
Less than
significant
impact with
mitigation
incorporated
No No No MMs HAZ-1a,
HAZ-1b
b) Create a significant
hazard to the public or
the environment
through reasonably
foreseeable upset and
accident conditions
involving the release of
hazardous materials into
the environment?
Less than
significant
impact with
mitigation
incorporated
No No No MMs HAZ-1a,
HYD-1
c) Emit hazardous
emissions or handle
hazardous or acutely
hazardous materials,
substances, or waste
within one-quarter mile
of an existing or
proposed school?
No impact No No No None
d) Be located on a site
which is included on a
list of hazardous
materials sites compiled
pursuant to
Government Code
Section 65962.5 and, as
a result, would it create
a significant hazard to
the public or the
environment?
Less than
significant
impact with
mitigation
incorporated
No No No MMs HAZ-1a,
HAZ-1b
e) For a project located
within an airport land
use plan or, where such
a plan has not been
adopted, within two
miles of a public airport
or public use airport,
would the project result
Less than
significant
impact
No No No None
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 47 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
in a safety hazard or
excessive noise for
people residing or
working in the project
area?
f) Impair implementation
of or physically interfere
with an adopted
emergency response
plan or emergency
evacuation plan?
Less than
significant
impact with
mitigation
incorporated
No No No MM HAZ-4
g) Expose people or
structures, either
directly or indirectly to a
significant risk of loss,
injury or death involving
wildland fires?
No impact No No No None
Discussion
a) The Certified EIR found that buildout of the business park may result in potential exposure to hazardous materials including asbestos, lead paint, polychlorinated biphenyls, mercury, and agricultural chemicals (i.e., residual pesticides). The Certified EIR set forth Mitigation Measures HAZ-1a and HAZ-1b, which required assessments for hazardous materials prior to demolition or grading activities and implementation of remediation measures if determined to be present.

The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with hazardous materials would occur. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR found that buildout of the business park may create potential risk of upset conditions through the release of hazardous materials from industrial land use activities that use such materials in routine operations. The Certified EIR set forth Mitigation Measures HAZ1a and HYD-2, which required assessments for hazardous materials prior to demolition or grading activities and implementation of stormwater Best Management Practices (BMPs). The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
48 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx therefore, no new impacts associated with hazardous materials would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR found that the business park project site was 1.25 miles from the nearest school and, therefore, did not have the potential to expose any schools to hazardous materials releases or emissions. The Certified EIR concluded that no impact would occur.

The KDN Property is also 1.25 miles from the nearest school. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with hazardous materials exposure would occur. As such, the conclusions of the Certified EIR remain unchanged.
d) The Certified EIR found that although the project site was not listed on the Cortese List, buildout of the business park may result in potential exposure to hazardous materials from past uses including asbestos, lead paint, polychlorinated biphenyls, mercury, and agricultural chemicals (i.e., residual pesticides). The Certified EIR set forth Mitigation Measures HAZ-1a and HAZ-1b, which required assessments for hazardous materials prior to demolition or grading activities and implementation of remediation measures if determined to be present. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with hazardous materials would occur. As such, the conclusions of the Certified EIR remain unchanged.
e) The Certified EIR indicated that the business park project site was 0.5 mile west of the Patterson Airport and within Zone 4 of the Stanislaus County Airport Land Use Commission Plan. The business park’s commercial and industrial land use activities are consistent with the applicable provisions of Zone 4. Furthermore, the proposed project’s end uses do not have any characteristics that would create sources of aviation hazards including smoke, electrical interference, or avian attractants. The Certified EIR concluded that impacts would be less than significant.

The Patterson Airport closed in the early 2010s and the Stanislaus County Airport Land Use Commission Plan has been amended to remove any airport land use compatibility provisions within the Patterson City limits. Thus, the KDN Property would be subject to these provisions.

As such, the conclusions of the Certified EIR remain unchanged. f) The Certified EIR found that the portion of the business park between I-5 and the California Aqueduct would only have one point of connection to the rest of the business park. The Certified EIR set forth Mitigation Measure HAZ-4, which required the applicant to establish an Emergency Vehicle Access to Del Puerto Road in conjunction with the development of this portion of the business park. The Certified EIR concluded that impacts would be less than significant with mitigation.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 49 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx The KDN Property abuts Rogers Road and has multiple points for emergency access. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with emergency access would occur. As such, the conclusions of the Certified EIR remain unchanged.
g) The Certified EIR noted that the business park project site contained cultivated agricultural uses and was surrounded by urban development and infrastructure on three sides.

Furthermore, the business park project site does not abut any areas susceptible to wildland fires. The Certified EIR concluded that no impact would occur.

The KDN Property abuts Rogers Road, the California Aqueduct, and the Delta-Mendota Canal; it does not abut any wildland areas. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with wildland fire exposure would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM HAZ-1a Prior to issuance of demolition permits for any structures located on the project site (including the residence and storage structure), the project applicant shall retain a certified hazardous waste contractor to properly remove and dispose of all materials containing asbestos, lead paint, PCBs, mercury and CFCs in accordance with federal and state law. The applicant shall submit documentation to the City of Patterson demonstrating that this contractor has been retained as part of the demolition permit application. Upon completion of removal and disposal, the project applicant shall provide documentation to the City of Patterson demonstrating that these activities were successfully completed.

MM HAZ-1b Prior to issuance of grading permits for any portion of the project site where pesticides or other agricultural chemicals have been applied within the preceding 12 months, the project applicant shall retain a qualified consultant to perform Phase II testing of the project site soils for the presence of residual concentrations of agricultural chemicals. Soils shall be laboratory tested for agricultural chemical residuals in accordance with California Department of Toxic Substances Control (DTSC) guidelines. If the testing yields concentrations in excess of acceptable limits for commercial or light industrial development, the project applicant shall retain a qualified contractor to perform soil remediation in accordance with DTSC guidelines.

The soil remediation activities shall be completed prior to grading activities. The applicant shall submit documentation to the City of Patterson demonstrating that soil testing was performed and any necessary remediation was completed as part of the grading permit application. This mitigation measure does not apply in locations where pesticides or other agricultural chemicals have not been applied within the preceding 12 months.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
50 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx MM HAZ-4 Prior to approval of the final map for Phase IV, the project applicant shall prepare and submit plans to the City of Patterson for review and approval demonstrating that the portion of the project site located between the California Aqueduct and Interstate 5 can be served with two points of emergency access in accordance with California Fire Code requirements. The approved plans shall be incorporated into the proposed project.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 51 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
X. Hydrology and Water Quality
Would the project:
a) Violate any water quality
standards or waste
discharge requirements
or otherwise substantially
degrade surface or
ground water quality?
Less than
significant
impact with
mitigation
incorporated
No No No MMs HYD-1,
HYD-2, HYD6a, HYD-6b
b) Substantially decrease
groundwater supplies or
interfere substantially
with groundwater
recharge such that the
project may impede
sustainable groundwater
management of the
basin?
Less than
significant
impact
No No No None
c) Substantially alter the
existing drainage pattern
of the site or area,
including through the
alteration of the course of
a stream or river or
through the addition of
impervious surfaces, in a
manner which would:

Less than
significant
impact with
mitigation
incorporated
No No No MM HYD-4
(i) result in substantial
erosion or siltation
on- or off-site;
Less than
significant
impact with
mitigation
incorporated
No No No MM HYD-4
(ii) substantially increase
the rate or amount of
surface runoff in a
manner which would
result in flooding onor off-site;
Less than
significant
impact with
mitigation
incorporated
No No No MM HYD-4
City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
52 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
(iii) create or contribute
runoff water which
would exceed the
capacity of existing or
planned stormwater
drainage systems or
provide substantial
additional sources of
polluted runoff; or
Less than
significant
impact with
mitigation
incorporated
No No No MM HYD-4
(iv)impede or redirect
flood flows?
Less than
significant
impact with
mitigation
incorporated
No No No MM HYD-4
d) In flood hazard, tsunami,
or seiche zones, risk
release of pollutants due
to project inundation?
No impact No No No None
e) Conflict with or obstruct
implementation of a
water quality control plan
or sustainable
groundwater
management plan?
N/A No No No None
Discussion
a) The Certified EIR found that buildout of the business park would result in potential cause erosion and sedimentation. The Certified EIR set forth Mitigation Measures HYD-1 and HYD-2, which required implementation of stormwater pollution prevention measures during construction and operations. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with water quality would occur. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR found that the City of Patterson was entirely reliant on groundwater for both non-potable and potable water supply. The business park was estimated to demand 1,397 acre-feet of water annually at buildout, of which 742 acre-feet would be for potable use and 654 acre-feet would be non-potable use. The safe yield of the upper aquifer (non-potable) was City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 53 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx estimated to be 3,500 acre-feet and the City of Patterson’s total consumption in Year 2032 (including business park) was estimated to be 3,220 acre-feet. The safe yield of the lower aquifer (potable) was estimated to be 8,900 acre-feet and the City of Patterson’s total consumption in Year 2032 (including business park) was estimated to be 6,986 acre-feet. Thus, Citywide demand would be within the safe yield of both aquifers. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with groundwater overdraft would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR noted that the business park proposed a storm drainage system consisting of underground piping and basins that would capture and detain runoff during storm events. The basins would be sized for a 50-year, 24-hour storm event, which is equivalent to 2.24 inches of rainfall. After a storm event, runoff would be released into the City’s municipal storm drainage system. Overall, these storm drainage improvements would be designed to prevent inundation of downstream facilities with excessive runoff, thereby eliminating the need for off-site storm drainage improvements. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with conflicts with flooding, new drainage facilities, or polluted runoff would occur. As such, the conclusions of the Certified EIR remain unchanged. d) The Certified EIR found that the business park would not be susceptible to a seiche because it was not bear any large inland bodies of water. It would also not be susceptible to a tsunami because it was more than 70 miles from the Pacific Ocean. Lastly, the Certified EIR found that the project site was not in a volcanically active area and, thus, would not be susceptible to a mudflow. The Certified EIR concluded that no impact would occur.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with conflicts with water quality control or sustainable groundwater management plans would occur. As such, the conclusions of the Certified EIR remain unchanged.
e) Conflicts with water quality control or sustainable groundwater management plans was not a question on the CEQA Appendix G Checklist when the Certified EIR was certified. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new or more intense construction would occur as a result of these actions and, therefore, no new impacts associated with conflicts with water quality control or sustainable groundwater management plans would occur. As such, the conclusions of the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
54 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Mitigation Measures
MM HYD-1 Prior to the issuance of grading permits or building permits for each phase of the project (whichever occurs first), the project applicant shall prepare and submit a Stormwater Pollution Prevention Plan (SWPPP) to the Central Valley RWQCB that identifies specific actions and Best Management Practices (BMPs) to prevent stormwater pollution during construction activities in accordance with the revised NPDES General Permit for Storm Water Discharges Associated with Construction Activity (Order 2009-0009 DWQ). The City of Patterson shall confirm that the RWQCB has approved the SWPPP prior to issuance of grading or building permits.

The SWPPP shall identify a practical sequence for BMP implementation and maintenance, site restoration, contingency measures, responsible parties, and agency contacts. The SWPPP shall include but not be limited to the following elements:
• Temporary erosion control measures shall be employed for disturbed areas. • No disturbed surfaces shall be left without erosion control measures in place during the winter and spring months.
• Sediment shall be retained on-site by a system of sediment basins, traps, or other appropriate measures.
• The construction contractor shall prepare Standard Operating Procedures for the handling of hazardous materials on the construction site to eliminate or reduce discharge of materials to storm drains.
• BMP performance and effectiveness shall be determined either by visual means where applicable (e.g., observation of above-normal sediment release), or by actual water sampling in cases where verification of contaminant reduction or elimination (such as inadvertent petroleum release) is required by the RWQCB to determine adequacy of the measure.
• In the event of significant construction delays or delays in final landscape installation, native grasses or other appropriate vegetative cover shall be established on the construction site as soon as possible after disturbance, as an interim erosion control measure throughout the wet season.

MM HYD-2 Prior to the issuance of building permits for the proposed project, the project applicant shall submit a stormwater quality management plan to the City of Patterson for review and approval. The stormwater quality management plan shall identify Low Impact Development techniques and pollution prevention measures and practices to prevent polluted runoff from leaving the project site. Examples of stormwater pollution prevention measures and practices that may be included in the plan but are not limited to:
• Strategically placed bioswales and landscaped areas that promote percolation of runoff
• Pervious pavement
• Roof drains that discharge to landscaped areas
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 55 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx • Trash enclosures with screen walls and roofs
• Stenciling on storm drains (e.g., “No Dumping”)
• Curb cuts in parking areas to allow runoff to enter landscaped areas • Rock-lined areas along landscaped areas in parking lots • Catch basins
• Oil/water separators
• Regular sweeping of parking areas and cleaning of storm drainage facilities • Employee training to inform store personnel of stormwater pollution prevention measures
MM HYD-4 Prior to issuance of grading permits for the proposed project, the project applicant shall retain a qualified civil engineer to prepare and submit a detailed drainage plan to the City of Patterson for review and approval. The drainage plan shall demonstrate compliance with City of Patterson standards regarding drainage designs, including sizing basins to accommodate a 50-year, 24-hour storm event. The approved plan shall be incorporated into the project design and final improvement plans.

MM HYD-6a Prior to any construction activities that would involve work within the California Aqueduct right-of-way, the project applicant shall obtain from the California Department of Water Resources an Encroachment Permit in accordance with the Division of Operations and Maintenance Encroachment Permit Guidelines.

Conditions of the Encroachment Permit shall be incorporated into project plans, which may include but may not be limited to installation of water pollution prevention measures along the California Aqueduct (e.g., fencing, full span roadway crossings, and avoidance of runoff discharge into the waterway).

MM HYD-6a Prior to any construction activities that would involve work within the DeltaMendota Canal right-of-way, the project applicant shall submit project grading, building, and drainage plans to the San Luis and Delta-Mendota Water Authority for review and approval. The project applicant shall incorporate measures into the proposed project that protect the Delta-Mendota Canal as recommended by the Water Authority. Such recommendations may include but may not be limited to:
• Bridge crossings with public walkways must be designed to prevent unwanted debris from being discharged into the canal.
• No roadway drainage shall be allowed to be discharged into the canal. • All roadway crossing support systems shall be full span. • Existing drain inlets shall be plugged.
• All storm drainage shall be conveyed either over or under the canal.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
56 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XI. Land Use and Planning
Would the project:
a) Physically divide an
established community?
No impact No No No None
b) Cause a significant
environmental impact
due to a conflict with
any land use plan, policy,
or regulation adopted
for the purpose of
avoiding or mitigating an
environmental effect?
Less than
significant
impact
No No No None
Discussion
a) The Certified EIR indicated that the business park project site contained mostly agricultural uses as well as one single-family residence within the Arambel portion of the project. The removal of one residence would not constitute the division of an established community. The Certified EIR concluded that no impact would occur.

There are no dwelling units within the KDN Property. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with division of an established community. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR found that the business park project involved annexing the project site into the City of Patterson, which required corresponding General Plan Amendment and Prezoning discretional approvals. The Certified EIR noted that the General Plan Amendment and Prezone were indispensable parts of the project and served to reconcile any conflicts with the City of Patterson General Plan and Zoning Ordinance. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ Parcel 2 abuts the portion of the Arambel Business Park designated ‘Light Industrial’ and, thus, would be compatible with its neighbors. Furthermore, because the purpose of the rezone is to rectify the oversupply of land designated ‘General Commercial,’ it serves to advance the planning objectives of the City of Patterson General Plan. As such, the conclusions of the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 57 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Mitigation Measures
None.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
58 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More
Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XII. Mineral Resources
Would the project:
a) Result in the loss of
availability of a known
mineral resource that
would be of value to the
region and the residents of
the State?
No impact No No No None
b) Result in the loss of
availability of a locallyimportant mineral
resource recovery site
delineated on a local
general plan, specific plan
or other land use plan?
No impact No No No None
Discussion
a-b) The Certified EIR found that the business park project site did not support mineral extraction land use activities and was not designated as a mineral resource zone by the State of California or the City of Patterson. Thus, there would be no loss of mineral resources of statewide or local importance. The Certified EIR concluded that no impact would occur.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with loss of mineral resources. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
None.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 59 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XIII. Noise
Would the project:
a) Generation of a
substantial temporary
or permanent increase
in ambient noise levels
in the vicinity of the
project in excess of
standards established in
the local general plan or
noise ordinance, or
applicable standards of
other agencies?
Less than
significant
impact
No No No None
b) Generation of excessive
groundborne vibration
or groundborne noise
levels?
Less than
significant
impact
No No No None
c) For a project located
within the vicinity of a
private airstrip or an
airport land use plan or,
where such a plan has
not been adopted,
within two miles of a
public airport or public
use airport, would the
project expose people
residing or working in
the project area to
excessive noise levels?
Less than
significant
impact
No No No None
Discussion
a) The Certified EIR found that construction would not exceed adopted thresholds because of the distance from the nearest sensitive receptor. The Certified EIR found that outdoor activity areas located within 500 feet of I-5 may be exposed to excessive noise levels. The Certified EIR set forth Mitigation Measure NOI-6, which required that outdoor activity areas be shielded from freeway noise. The Certified EIR concluded that potential permanent operational noise impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
60 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx therefore, no new impacts associated with construction or operational would occur. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR found that construction and operational vibration would not exceed adopted thresholds because of the distance from the nearest sensitive receptor. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with vibration would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR found that the business park project site was within 0.5 mile of the Patterson Airport. Noise measurements indicate that the project site was exposed to 58.4 dBA Ldn, which is within acceptable noise levels for commercial and light industrial land uses. The Certified EIR concluded that impacts would be less than significant.

The Patterson Airport closed in the early 2010s. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with aviation noise exposure would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM NOI-6 Prior to issuance of building permits for any office buildings that would be located within 500 feet of Interstate 5 or Rogers Road, the project applicant shall submit plans to the City of Patterson for review and approval demonstrating that any outdoor uses (e.g., seating areas) are located on the side of the building that is shielded from the roadway. The approved plans shall be incorporated into the proposed project.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 61 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XIV. Population and Housing
Would the project:
a) Induce substantial
unplanned population
growth in an area,
either directly (for
example, by proposing
new homes and
businesses) or indirectly
(for example, through
extension of roads or
other infrastructure)?
Less than
significant
impact
No No No None
b) Displace substantial
numbers of existing
people or housing,
necessitating the
construction of
replacement housing
elsewhere?
Less than
significant
impact
No No No None
Discussion
a) The Certified EIR found that buildout of the business park would create 10,093 new jobs or an average of 505 new jobs a year over a 20-year buildout period. Stanislaus County had 40,400 unemployed persons in 2012 and, thus, there was adequate labor available to fill the new jobs.

As such, there would not be substantial population growth from an influx of project employees into Stanislaus County. Furthermore, the business park was consistent with the City of Patterson General Plan’s land use designations and, thus, represents planned growth. As such, growth inducement would not occur. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new employment growth would occur. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR noted that there was one single-family residence within the Arambel portion of the project site that would eventually be removed as the business park builds out. The removal of one single-family residence would not trigger the need for the construction of replacement housing elsewhere such that significant impacts on the environment would occur.

The Certified EIR concluded that impacts would be less than significant.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
62 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx There are no dwelling units within the KDN Property. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no dwelling units would be removed. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
None.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 63 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XV. Public Services
Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
a) Fire protection? Less than
significant
impact with
mitigation
incorporated
No No No MMs HAZ-4,
PSU-1,
TRANS-1a
b) Police protection? Less than
significant
impact with
mitigation
incorporated
No No No MM PSU-2
c) Schools? No impact No No No None
d) Parks? No impact No No No None
e) Other public facilities? No impact No No No None
Discussion
a) The Certified EIR found that buildout of the business park would increase demand for fire protection and emergency medical services. The Patterson Fire Department indicated that there would be a need for a new fire station in the western portion of the city limits. The Certified EIR set forth Mitigation Measure PSU-1, which requires the Arambel Business Park to make an irrevocable dedication offer to the City of Patterson for a new fire station site. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in demand for fire protection or emergency medical services would occur. Furthermore, Mitigation Measure PSU-1 applies to the Arambel portion of the site and not the KDN portion. As such, the conclusions of the Certified EIR remain unchanged. b) The Certified EIR found that buildout of the business park would increase demand for police protection. The Patterson Police Department indicated that the business park would primarily generate calls for service for property crimes, alarms, vehicle accidents, and nuisance violations. The EIR set forth Mitigation Measure PSU-2, which requires the applicant to consult with the Police Department about appropriate security measures prior to issuance of the City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
64 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx certificate of occupancy. The Certified EIR concluded that impacts would be less than significant with mitigation
The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in demand for police protection would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR found that the business park is entirely nonresidential and, therefore, would not directly increase enrollment in K-12 schools. Thus, no new or expanded school facilities would be required. The EIR concluded that no impact would occur.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in demand for K-12 education would occur. As such, the conclusions of the Certified EIR remain unchanged.
d) The Certified EIR found that the business park is entirely nonresidential and, therefore, would not directly increase demand for parks. Thus, no new or expanded park facilities would be required. The Certified EIR concluded that no impact would occur.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in demand for parks would occur. As such, the conclusions of the Certified EIR remain unchanged.
e) The Certified EIR found that the business park is entirely nonresidential and, therefore, would not directly increase demand for public facilities such as libraries or community centers. Thus, no new or expanded public facilities would be required. The Certified EIR concluded that no impact would occur.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in demand for public facilities would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM PSU-1 Prior to recordation of the final map for the Arambel Business Park for where the new fire station would be located, the project applicant shall make an irrevocable dedication offer to the City of Patterson for a new fire station site. The fire station site shall provide the minimum amount of acreage necessary to meet industry standards for a fire station site. The terms of the dedication shall be negotiated as part of the Development Agreement. Should the City of Patterson elect to develop the new fire station at another location, the applicant shall have the ability to retain the acreage for private use. The Community Facility District or similar financing City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 65 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx mechanism would fund construction of the fire station. [This mitigation measure does not apply to the proposed project]
MM PSU-2 Prior to the issuance of the certificate of occupancy for each project building, the project applicant shall consult with the Patterson Police Department regarding appropriate security measures. Such measures may include video surveillance systems, fencing, lighting, on-site security personnel, parking lot patrols, or other appropriate measures. The mutually agreed upon measures shall be incorporated into the plans for each building.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
66 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XVI. Recreation
Would the project:
a) Would the project
increase the use of
existing neighborhood
and regional parks or
other recreational
facilities such that
substantial physical
deterioration of the
facility would occur or
be accelerated?
No impact No No No None
b) Does the project include
recreational facilities or
require the construction
or expansion of
recreational facilities,
which might have an
adverse physical effect
on the environment?
No impact No No No None
Discussion
a-b) The Certified EIR found that the business park is entirely nonresidential and, therefore, would not directly increase demand for recreational facilities. Thus, no new or expanded park facilities would be required. The Certified EIR concluded that no impact would occur.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in demand for recreational facilities would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
None.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 67 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XVII. Transportation
Would the project:
a) Conflict with a program
plan, ordinance or policy
of the circulation
system, including transit,
roadway, bicycle and
pedestrian facilities?
Less than
significant
impact with
mitigation
incorporated
No No No MMs TRANS1a, TRANS-1b,
TRANS-1c,
TRANS-1d,
TRANS-1e,
TRANS-1f,
TRANS-1g,
TRANS-1h,
TRANS-1i,
TRANS-2a,
TRANS-2b,
TRANS-2c,
TRANS-2d,
TRANS-2e,
TRANS-2f,
TRANS-2g,
TRANS-2h,
TRANS-2i,
TRANS-2j,
TRANS-2k,
TRANS-2l,
TRANS-2m,
TRANS-2n,
TRANS-2o,
TRANS-2p
b) Would the project
conflict or be
inconsistent with CEQA
Guidelines Section
15064.3, subdivision (b)?
N/A No No No TRANS-6
c) Substantially increase
hazards due to a
geometric design
feature (e.g., sharp
curves or dangerous
intersections) or
incompatible uses (e.g.,
farm equipment)?
Less than
significant
impact
No No No None
d) Result in inadequate
emergency access?
Less than
significant
impact with
mitigation
incorporated
No No No MM HAZ-4
City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
68 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Discussion
a) The Certified EIR found that the business park would generate 11,755 AM (7:00 a.m. to 9:00 a.m.) peak-hour trips and 15,319 PM (4:00 p.m. to 6:00 p.m.) peak-hour trips at buildout.

These trips would contribute to unacceptable intersection operations, roadway segment operations, and freeway operations. The Certified EIR set forth Mitigation Measures TRANS-1a, TRANS-1b, TRANS-1c, TRANS-1d, TRANS-1e, TRANS-1f, TRANS-1g, TRANS-1h, TRANS-1i, TRANS2a, TRANS-2b, TRANS-2c, TRANS-2d, TRANS-2e, TRANS-2f, TRANS-2g, TRANS-2h, TRANS-2i, TRANS-2j, TRANS-2k, TRANS-2l, TRANS-2m, TRANS-2n, TRANS-2o, and TRANS-2p, which require payment of fees or installation of traffic improvements. The Certified EIR noted that a number of the improvements were outside the jurisdictional control of the City of Patterson and, therefore, there was uncertainty regarding whether they would be implemented as envisioned.

The Certified EIR concluded that impacts would be significant and unavoidable.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in peak-hour trips would occur such that transportation facilities would experience unacceptable operations. As such, the conclusions of the Certified EIR remain unchanged.
b) Vehicle miles traveled question was not on the CEQA Appendix G Checklist when the Certified EIR was prepared and was not recognized by the City as a threshold of significance for analyzing traffic impacts on the environment. The business park is located adjacent to I-5, a regional and interstate goods movement corridor. Thus, it minimizes the distance vehicles need to travel to get to and from I-5, which contributes to a reduction in vehicle miles traveled. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in vehicle miles traveled would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR found that the business park’s internal circulation network met City and industry standards for commercial and industrial development and would allow for safe and efficient heavy vehicle travel. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in peak-hour trips would occur such that roadway safety hazards would be created. As such, the conclusions of the Certified EIR remain unchanged. d) The Certified EIR found that the portion of the business park between I-5 and the California Aqueduct would only have one point of connection to the rest of the business park. The Certified EIR set forth Mitigation Measure HAZ-4, which required the applicant to establish an Emergency Vehicle Access to Del Puerto Road in conjunction with the development of this City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 69 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx portion of the business park. The Certified EIR concluded that impacts would be less than significant with mitigation.

The KDN Property abuts Rogers Road and has multiple points for emergency access. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with emergency access would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM TRANS-1a Prior to recordation of the first final map, the project applicant and the City of Patterson shall establish a Community Facilities District or other financing mechanism to fund transportation improvements. Applicants that pursue development in accordance with the Master Development Plan shall contribute a fair share of the costs of necessary improvements at the time building permits are sought through participation in the Community Facilities District or other financing mechanism.

MM TRANS-1b At the time of 5 percent of Phase I buildout, the intersection of Sperry Avenue/I-5 Southbound Ramps shall be signalized. At the time of 80 percent of Phase I buildout, left-turn lanes shall be added to the southbound and westbound approaches. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-1c At the time of 5 percent of Phase I buildout, the intersection of Sperry Avenue/I-5 Northbound Ramps shall be signalized and the signal operation shall be coordinated with the signal at the Sperry Avenue/I-5 Southbound Ramps intersection. At the time of 80 percent of Phase I buildout, the following improvements shall be implemented:
(1) Install a left-turn lane on the eastbound approach, (2) install a right-turn lane on the westbound approach, and (3) install a right-turn lane on the northbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-1d At the time of 50 percent of Phase I buildout, the intersection of Rogers Road/State Route 33 shall be signalized. This improvement shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-1e At the time of 8 percent of Phase I buildout, the intersection of Sycamore Avenue/East Las Palmas Avenue shall be signalized. This improvement shall be City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
70 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-1f At the time of 10 percent of Phase I buildout, intersection of East Las Palmas Avenue/Poplar Avenue shall be signalized. At the time of 60 percent of Phase I buildout, a right-turn lane shall be installed on the westbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-1g At the time of 30 percent of Phase I buildout, intersection of West Main Avenue/Carpenter Road shall be signalized. At the time of 60 percent of Phase I buildout, the following improvements shall be implemented: (1) install a left-turn lane on the eastbound approach, and (2) install a left-turn lane on the westbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS1a.

MM TRANS-1h At the time of 20 percent of Phase I buildout, intersection of West Main Avenue/Crows Landing Road shall be signalized. At the time of 60 percent of Phase I buildout, the following improvements shall be implemented: (1) install a left-turn lane on the eastbound approach, and (2) install a left-turn lane on the westbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS1a.

MM TRANS-1i When intersection operations approach unacceptable levels, but not later than 50 percent buildout of Phase I, the intersection of Rogers Road/North-South Internal Roadway shall be signalized. This improvement shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2a When intersection operations approach unacceptable levels, the intersection of Sperry Avenue/Rogers Road shall be improved. The improvements shall consist of (1) installing a through and right-turn lane on the eastbound approach; (2) installing two left-turn lanes, a through lane, and two right-turn lanes on the westbound approach; (3) installing a left-turn lane, a through lane, and a right-turn lane on the northbound approach; and (4) installing a through lane on the southbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS1a.

MM TRANS-2b When intersection operations approach unacceptable levels, the intersection of Sperry Avenue/Baldwin Road shall be improved. The improvements shall consist of (1) signalizing the intersection; (2) installing a left-turn and a right-turn lane on the eastbound approach; (3) installing a left-turn, a through lane, and two right-turn City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 71 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx lanes on the westbound approach; (4) installing two left-turn lanes on the northbound approach; and (5) installing two left-turn lanes on the southbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS1a.

MM TRANS-2c When intersection operations approach unacceptable levels, the intersection of Sperry Avenue/Ward Avenue shall be improved. The improvements shall consist of (1) installing a left-turn lane on the eastbound approach, (2) installing a left-turn lane on the northbound approach, and (3) installing a right-turn lane on the southbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS1a.

MM TRANS-2d When intersection operations approach unacceptable levels, the intersection of Sperry Avenue/S. Del Puerto Avenue shall be improved. The improvements shall consist of (1) installing a left-turn lane on the eastbound approach and (2) installing a left-turn lane on the westbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2e In the event that the intersection of Sperry Avenue/State Route 33 has not been signalized at the time of issuance for the first certificate of occupancy for Phase II of the proposed project, the intersection shall be signalized. This improvement shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a. This mitigation measure shall not apply if the intersection is signalized prior to issuance for the first certificate of occupancy for Phase II of the proposed project.

MM TRANS-2f When intersection operations approach unacceptable levels, the intersection of Ward Avenue/American Eagle Drive shall be improved. The improvements shall consist of installing a right-turn lane on the southbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2g When intersection operations approach unacceptable levels, the intersection of Ward Avenue/SR-33 shall be improved. The improvements shall consist of (1) signalizing the intersection and (2) installing a left-turn lane on the northbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS1a.

MM TRANS-2h When intersection operations approach unacceptable levels, the intersection of Zacharias Road/SR-33 shall be improved. The improvements shall consist of (1) signalizing the intersection, (2) installing two left-turn lanes on the northbound City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
72 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx approach, and (3) installing a right-turn lane on the eastbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2i When intersection operations approach unacceptable levels, the intersection of Baldwin Road/SR-33 shall be improved. The improvements shall consist of (1) signalizing the intersection, (2) installing a left-turn lane on the northbound approach, and (3) installing a right-turn lane on the southbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2j When intersection operations approach unacceptable levels, the intersection of Rogers Road/SR-33 shall be improved. The improvements shall consist of (1) signalizing the intersection and (2) installing a left-turn lane on the northbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS1a.

MM TRANS-2k When intersection operations approach unacceptable levels, the intersection of SR33/Eucalyptus Avenue shall be improved. The improvements shall consist of (1) installing a left-turn and a through lane on the southbound approach and (2) installing a through lane on the northbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2l When intersection operations approach unacceptable levels, the intersection of Olive Avenue/SR-33 shall be improved. The improvements shall consist of (1) signalizing the intersection, (2) installing a left-turn lane on the eastbound approach, (3) installing a left-turn lane on the westbound approach, (4) installing a left-turn lane on the northbound approach, and (5) installing a left-turn lane on the southbound approach. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2m When intersection operations approach unacceptable levels, the intersection of Walnut Avenue/Sycamore Avenue shall be improved. The improvements shall consist of signalizing the intersection. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2n When intersection operations approach unacceptable levels, but not later than issuance of the first certificate of occupancy for Phase III of the proposed project, the intersection of Rogers Road/Keystone Pacific Parkway shall be improved. The improvements shall consist of signalizing the intersection. These improvements shall City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 73 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2o When intersection operations approach unacceptable levels, but not later than issuance of first certificate of occupancy for Phase IV of the proposed project, the intersection of Zacharias Road/Rogers Road shall be improved. The improvements shall consist of signalizing the intersection. These improvements shall be programmed into the Community Facilities District or other financing mechanism contemplated by Mitigation Measure TRANS-1a.

MM TRANS-2p Prior to issuance of building permits for each project building, the project applicant shall provide fair-share fees for the planned I-5/Zacharias Road interchange, if this improvement is programmed into an adopted fee program. This mitigation measure does not apply if the improvement is not programmed into an adopted fee program at the time building permits are sought.

MM TRANS-6 Prior to issuance of the first certificate of occupancy for each project use, the applicant shall prepare and submit documentation to the City of Patterson demonstrating that feasible Transportation Demand Management measures have been incorporated. The documentation shall either (1) show how at least one or more of the following Transportation Demand Management measures has been integrated into the use or (2) explain why such a measure is not feasible (such as workforce characteristics, facility operational characteristics, health and safety, etc.):
• Pedestrian facilities (e.g., internal pedestrian facilities that provide connectivity to sidewalks or nearby land uses)
• End-of-trip bicycle facilities (e.g., racks, lockers, changing/locker rooms, shower facilities)
• Alternative (flex-time) work schedules that allow non-peak travel by employees • Commute Trip Reduction Programs that provide incentives for employees to carpool, use transit, ride bicycles, or use other modes of non-single-occupant vehicle transportation.
• Multi-Modal Transportation Guides that provide information to employees regarding various routes to a particular location via different modes of transportation
• The establishment of a Transportation Management Association for a large employer or a group of employers. The association would provide transportation (e.g., employee shuttles) for employees of companies that participate in the organization.
• Telecommute (or work-from-home) options for employees who can work remotely.
• Any other Transportation Demand Management measure not specified on this list.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
74 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XVIII. Utilities and Service Systems
Would the project:
a) Require or result in the
relocation or construction
of new or expanded
water, wastewater
treatment or stormwater
drainage, electric power,
natural gas, or
telecommunications
facilities, the construction
or relocation of which
could cause significant
environmental effects?
Less than
significant
impact
No No No None
b) Have sufficient water
supplies available to serve
the project and
reasonably foreseeable
future development
during normal, dry and
multiple dry years?
Less than
significant
impact with
mitigation
incorporated
No No No MM PSU-3
c) Result in a determination
by the wastewater
treatment provider which
serves or may serve the
project that it has
adequate capacity to
serve the project’s
projected demand in
addition to the provider’s
existing commitments?
Less than
significant
impact with
mitigation
incorporated
No No No MM PSU-4
d) Generate solid waste in
excess of State or local
standards, or in excess of
the capacity of local
infrastructure, or
otherwise impair the
attainment of solid waste
reduction goals?
Less than
significant
impact with
mitigation
incorporated
No No No MM PSU-6a,
PSU-6b
e) Comply with federal,
State, and local
management and
reduction statutes and
regulations related to
solid waste?
Less than
significant
impact with
mitigation
incorporated
No No No MM PSU-6a,
PSU-6b
City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 75 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Discussion
a) The Certified EIR disclosed that off-site utility connections would need to be made to municipal utilities within the Villa Del Lago area. The utility alignments would follow existing roads and infrastructure easements and avoid natural areas where significant impacts may occur.

Furthermore, no upgrades to the City of Patterson water treatment, wastewater treatment, or downstream storm drainage facilities are necessary. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no increase in demand for utilities would occur. As such, the conclusions of the Certified EIR remain unchanged.
b) The Certified EIR found that the City of Patterson was entirely reliant on groundwater for both non-potable and potable water supply. The business park was estimated to demand 1,397 acre-feet of water annually at buildout, of which 742 acre-feet would be for potable use and 654 acre-feet would be non-potable use. The safe yield of the upper aquifer (non-potable) was estimated to be 3,500 acre-feet and the City of Patterson’s total consumption in Year 2032 (including business park) was estimated to be 3,220 acre-feet. The safe yield of the lower aquifer (potable) was estimated to be 8,900 acre-feet and the City of Patterson’s total consumption in Year 2032 (including business park) was estimated to be 6,986 acre-feet. Thus, adequate water supply was available for the business park and the City of Patterson as a whole. The Certified EIR set forth Mitigation Measure PSU-3, which requires new development to incorporate water conserving features into their plans. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with water supply would occur. As such, the conclusions of the Certified EIR remain unchanged.
c) The Certified EIR estimated that the business park would generate 533,900 gallons per day of wastewater at buildout. The City of Patterson Water Quality Control Facility had an existing capacity of 2.25 million gallons per day and treated an average of 1.25 million gallons per day under dry weather conditions. The City had approved a facility expansion that would increase treatment capacity to 3.5 million gallons. The EIR set forth Mitigation Measure PSU-4, which requires the applicant to either connect to the City’s municipal sewer system or construction an on-site package plant. Note that the applicant withdrew the package plant proposal and the entire business park would be served by the City’s municipal system. The Certified EIR concluded that impacts would be less than significant.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
76 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx therefore, no new impacts associated with wastewater treatment would occur. As such, the conclusions of the Certified EIR remain unchanged.
d-e) The Certified EIR estimated that construction activities would generate 36,680 cubic yards of solid waste and operational activities would generate 45,261 cubic yards of solid waste annually. The Certified EIR indicated that the Fink Road Landfill near Crows Landing had 10 million cubic yards of remaining capacity. The Certified EIR set forth Mitigation Measures PSU6a and PSU-6b, which requires implementation of construction and demolition debris recycling practices and solid waste management plans for operational activities to promote diversion of recoverable materials and green waste from the waste stream. The Certified EIR concluded that impacts would be less than significant with mitigation.

The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with solid waste would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
MM PSU-3 Prior to the issuance of building permits for each project building, the project applicant shall submit plans to the City of Patterson for review and approval that demonstrate that applicable water conservation Best Management Practices have been incorporated into project design and landscaping. Examples of Best Management Practices include but are not limited to low-water-use fixtures (e.g., restroom sinks, urinals, and toilets) and water-conserving landscaping (e.g., droughttolerant species). The approved plans shall be incorporated into the proposed project.

MM PSU-4 Prior to issuance of building permits for each project building, the applicant shall do one of the following:
1) Prepare and submit improvement plans demonstrating that the proposed use(s) would connect to the City of Patterson’s municipal wastewater collection and treatment system. The applicant must obtain confirmation that adequate collection and treatment capacity exist to serve the proposed use(s). The applicant shall provide fair-share fees to the City of Patterson for wastewater treatment system improvements through participation in a Community Facilities District or other financing mechanism.
2) Prepare and submit improvement plans demonstrating that the proposed use(s) would connect to a privately owned and operated on-site wastewater treatment plant. The applicant must obtain confirmation that adequate collection and treatment capacity exist to serve the proposed use(s). The treatment plant must be fully permitted by the state and County of Stanislaus prior to occupancy of the uses. The project applicant is responsible for the full cost of construction and operation of the on-site wastewater treatment plant.

City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 77 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx MM PSU-6a Prior to issuance of building permits, the project applicant shall retain a qualified contractor to perform construction debris recycling. The applicant shall establish an objective of diverting a minimum of 50 percent of construction debris from the waste stream. The project applicant shall provide documentation to the satisfaction of the City of Patterson demonstrating that construction and demolition debris was recycled.

MM PSU-6b Prior to the issuance of final certificates of occupancy for each building developed within the West Patterson Business Park Expansion, the project applicant shall provide information to the City of Patterson describing the methods by which recycling and waste diversion activities shall be achieved. This information shall include but is not limited to the type and location of facilities necessary to collect and store recyclable materials, contractors who would pick-up recyclable and reusable materials, and how recycling and waste diversion activities would be integrated into operational practices. To the extent feasible, centralized recycling facilities within each use are encouraged to enhance the ease and efficiency of such practices.

Conclusion
The conclusions from the Certified EIR remain unchanged.

City of Patterson—KDN Property Rezone Project
CEQA Checklist Initial Study/Addendum
78 FirstCarbon Solutions Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Environmental Issue
Area
Conclusion in
Certified EIR
Do the
Proposed
Changes Involve
New or More
Severe Impacts?
New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Requiring New
Analysis or
Verification?
Mitigation
Measures
XIX. Wildfire
If located in or near State Responsibility Areas or lands classified as very high fire hazard severity zones, would the project:
a) Substantially impair an
adopted emergency
response plan or
emergency evacuation
plan?
Less than
significant
impact with
mitigation
No No No MM HAZ-4
b) Due to slope, prevailing
winds, and other factors,
exacerbate wildfire risks,
and thereby expose
project occupants to,
pollutant concentrations
from a wildfire or the
uncontrolled spread of a
wildfire?
N/A No No No None
c) Require the installation or
maintenance of
associated infrastructure
(such as roads, fuel
breaks, emergency water
sources, power lines or
other utilities) that may
exacerbate fire risk or
that may result in
temporary or ongoing
impacts to the
environment?
N/A No No No None
d) Expose people or
structures to significant
risks, including
downslope or
downstream flooding or
landslides, as a result of
runoff, post-fire slope
instability, or drainage
changes?
N/A No No No None
Discussion
a) The Certified EIR found that the portion of the business park between I-5 and the California Aqueduct would only have one point of connection to the rest of the business park. The Certified EIR set forth Mitigation Measure HAZ-4, which required the applicant to establish an City of Patterson—KDN Property Rezone Project
Initial Study/Addendum CEQA Checklist
FirstCarbon Solutions 79 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/5764/57640001/Addendum/57640001 KDN Property Rezone Project IS Addendum.docx Emergency Vehicle Access to Del Puerto Road in conjunction with the development of this portion of the business park. The Certified EIR concluded that impacts would be less than significant with mitigation.

The KDN Property abuts Rogers Road and has multiple points for emergency access. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with emergency access would occur. As such, the conclusions of the Certified EIR remain unchanged.
b-d) Wildfire-specific impacts were not on the CEQA Appendix G Checklist when the EIR was prepared. However, the Certified EIR addressed potential impacts associated with wildfire in its analysis of hazards. The KDN Property abuts Rogers Road, the California Aqueduct, and the Delta-Mendota Canal; it does not abut any State Responsibility Areas, lands classified as very high fire hazard severity zones, or wildland areas and, thus, would not be susceptible to wildland fires or post-fire impacts. The proposed project would subdivide the KDN Property into two parcels and rezone Parcel 2 to ‘Light Industrial.’ No new construction would occur as a result of these actions and, therefore, no new impacts associated with wildland fire exposure would occur. As such, the conclusions of the Certified EIR remain unchanged.

Mitigation Measures
None.

Conclusion
The conclusions from the Certified EIR remain unchanged.

THIS PAGE INTENTIONALLY LEFT BLANK