CITY OF PATTERSON

LOCAL ROAD SAFETY PLAN

CITY COUNCIL MEETING
September 5th, 2023
AGENDA
• What is Local Road Safety Plan (LRSP)?
• LRSP Development Process
• Benefits of LRSP
• Community Engagement and Comments
• Collision Analysis and Findings
• Emphasis Areas
• High Injury Intersections and Corridors
• Countermeasure Toolbox
• Safety Projects
• Questions
What is Local Road Safety Plan (LRSP)?
Overarching Goals:
o To reduce City’s roadways and intersections collisions that kill or severely injure (KSI)
o To identify, analyze and prioritize roadway and intersection safety improvements on local roads
o A required document to be eligible for the Highway Safety Improvement Program (HSIP) grant funding
• Considers Engineering and Non-engineering Strategies
o 5 E’s of Traffic Safety: Education, Enforcement,
Engineering, Equity and Emergency Medical Services
(EMS)
Benefits of Local Road Safety Plan
• Data driven approach to identify, analyze, and prioritize roadway safety improvements • Considers stakeholder and community feedback to identify additional traffic safety related concerns
• Holistic approach: incorporates more than just engineering solutions • Allows the City to implement a systemic approach to address collisions • Tailored to the City’s and Community specific traffic safety needs –based on the data • Implementation: City is eligible to apply for grants (HSIP, ATP and SS4A) • Highway Safety Improvement Program (HSIP):
o LRSP is required to apply for HSIP grant funding
o Safety Projects identified are eligible as long as certain criteria are met o Next HSIP Cycle 12
LRSP Development Process
Data Collection
(5 years – 2015-2019)
Collision Trend
Analysis
Identification of High-Risk
Network (intersection and
roadway segments)
Identify Emphasis
Areas
Develop Countermeasures
Toolbox
(Caltrans Approved)
Cost-Estimates
and BCR
LRSP Report Develop Safety
Projects
Stakeholder
Input
Community
Input (Project
Website)
Stakeholder
Input
Stakeholder
Input
All injury collisions Uses Caltrans Methodology
Community Engagement and Comments
• 159 responses • Map was promoted on City’s website and social media • Intersection Safety and speeding were the most
commented concerns
Community Engagement and Comments
0 10
20 30
40 50
60 70
80 Community Engagement and Comments
Corridors with most comments:
• Sperry Ave
• S 2nd St
• Ward Ave
Most comments on these
corridors
4 12
78 12
2 17
6 13
23 5
0 10
20 30
40 50
60 70
80 90
Most commented concern
Traffic Concerns Corridors with traffic concerns
• 78 residents are concerned about safety at intersections:
o These intersections are along Sperry Avenue, S 2nd St and Ward Avenue • 23 residents are concerned about speeding
• Additional concerns related to pedestrian safety and visibility Stakeholder Outreach
• Stakeholder Outreach #1– May 25th, 2022
• Stakeholder Outreach #2– May 30th, 2023
o Stakeholders included: City Staff, Patterson Police Department, Patterson Fire Department, Patterson Unified School District, Stanislaus County Transportation Authority, Caltrans, and Patterson Residents
o Introduction to LRSP process and review of collision analysis and high injury network
o Explanation and demonstration of interactive map on the project website used to solicit additional feedback and areas of concern from City of Patterson residents and stakeholders
o Feedback (other areas of concern not identified in data analysis) considered in developing the safety projects
Collision Analysis and Findings • 142 collisions between 2016 and 2020 • 18 killed and severe injury (KSI) collisions
Fatal
4%
Severe
Injury…
Visible
Injury…
Complaint
of Pain
56%
17 17
35 35
38 1
3 6
3 5
0 10
20 30
40 2016 2017 2018 2019 2020
Total KSI
Five Year Collision Trend (2016-2020)
Collisions by Severity (2016-2020)
Injury Collisions in the City of Patterson (2016 -2020) Collision Analysis and Findings
9% 8%
20%
34%
13%
2%
10%
5%
0%
6%
11% 11%
33%
6%
28%
6%
0%
5%
10%
15%
20%
25%
30%
35%
40%
Head- On Sideswipe Rear End Broadside Hit Object Overturned Vehicle/ Pedestrian
Other
Total KSI
4%
23%
3% 3%
12%
18%
4%
12%
20%
0%
39%
0%
6% 6%
0%
17%
11%
22%
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
DUI Unsafe
Speed
Wrong Side
of Road
Pedestrian
Right of
Way
Improper
Turning
Automobile
Right of
Way
Pedestrian
Violation
Traffic
Signals and
Signs
Other
Total KSI
2%
10%
54%
6% 6%
14%
8% 6%
33%
17%
28%
17%
0%
10%
20%
30%
40%
50%
60%
Total KSI
22%
78%
KSI Collisions
Roadway Segment Intersection
11%
89%
All Collisions
Roadway Segment Intersection
Collisions by Type
Primary Collision Factor Motor Vehicle Involved With
Emphasis Areas
• Address Hit Object Collisions
• Address Unsafe Speed Collisions
• Address Pedestrian Safety
• Address Nighttime Collisions
• Address Broadside Collisions
• Improve collisions on Sperry Avenue (Intersections)
Equivalent Property Damage Only (EPDO Score)
Collision Severity EPDO Score
Killed and Severe Injury (KSI)
Combined
Visible Injury
Complain of Pain
PDO
EPDO Score =
(165 x # of Fatal Collisions) +
(165 x # of Severe Injury Collisions) +
(11 x # of Other Visible Injury Collisions) +
(6 x # of Complaint of Pain Collisions) +
(1 x # of PDO Collisions)
(Source: Local Roadway Safety Manual 2020, Caltrans)
High Injury Network (Intersection)
ID Intersection
Total KSI EPDO
Score
Collisions
1 2
nd Street and Las Palmas Avenue 4 2 342
2 Las Palmas Avenue and Hartley
Street 6 1 205
3 1
st Street and Sperry Avenue 3 1 182
4 2
nd Street and El Circulo 3 1 177
5 Keystone Pacific Parkway and
Park Center Drive 2 1 176
6 Eucalyptus Avenue and Highway
33 2 1 171
7 Sperry Avenue and Las Palmas
Avenue 2 1 165
8 Cornflower Avenue and American
Eagle Avenue 1 1 165
9 Eucalyptus Avenue and Sycamore
Avenue 1 1 165
10 9
th Street and Ward Avenue 1 1 165
High Injury Network (Corridor)
ID Corridors
Total KSI EPDO
Score
Collisions
A
Las Palmas Avenue from East
City limit to 2nd Street 5 2 358
B
Sperry Avenue from Del Puerto
Avenue to Walker Ranch
Parkway
4 2 342
C
2 nd Street from North City limit
to 0.2 miles south of Walnut
Avenue
4 1 188
D
American Eagle Avenue from
Creekside Middle School to
Fawn Lily Drive
3 33
E
Sperry Avenue from West City
limit to Park Center Drive 2 17
Countermeasures- Signalized Intersections Improvements
S02- Improve Signal Hardware (lenses, backplates with retroreflective borders, mounting, size, and number )
S21PB- Modify signal phasing to implement a Leading
Pedestrian Interval (LPI)
S20PB- Advance Stop Bar (Bicycle Box)
S03- Improve Signal Timings
(coordination, phases, red, yellow, or
operation)
NS06- Install/upgrade larger or additional
stop signs or other intersection
warning/regulatory signs
NS08- Install Flashing Beacons at StopControlled Intersections NS07- Upgrade Intersection pavement
marking (NS.I)
NS05- Convert intersection to miniroundabout
Countermeasures- Non- Signalized Intersections Improvements R01- Add Segment Lighting R22- Install/Upgrade signs with new fluorescent sheeting (regulatory or warning)
R32PB- Install Bike Lanes
R35PB- Install/upgrade pedestrian crossing (with enhanced safety features)
Countermeasures- Roadway Segments Improvements
Safety Projects
Project 1: Systemic Improvements at Signalized Intersection Project 2: Citywide Signal Hardware and Retiming
Project 3: Systemic Improvements at Non-signalized Intersections Project 4: Systemic Improvements at Non-signalized intersections (mini-roundabouts) Project 5: Systemic Improvements at Roadway Segments (Pedestrian and Bicycle Safety improvements) Project 6: Citywide Sign Upgrade
Project 7: Funding for Sperry Ave & 2nd St-HSIP Cycle 11 Signalized Intersections
City of Patterson: High Injury Signalized Intersection

11. S 2
nd St and W Las Palmas Avenue

17. Sperry Ave & Rogers Rd

16. Sperry Ave & Park Center Dr

15. Sperry Ave & Baldwin Rd

14. Sperry Ave & Walker Ranch Pkwy

12. Sperry Ave & American Eagle Ave

13. Sperry Ave & W Las Palmas Ave

10. Sperry Ave & Ward Ave

9. Sperry Ave & S Del Puerto Ave

8. E Las Palmas Ave & N Harley St

7. E Las Palmas Ave & N 1st St

6. W Las Palmas Ave & N 2nd St

5. W Las Palmas Ave & Ward Ave

4. Walnut Ave & N Hartley St

3. Walnut Ave & N 1st St

2. M St & N 2nd St

1. American Eagle Ave & Ward Ave
1 2 3
4 5
6 7
8 9
10 11
12 13 17 14 15 16
Project 1: Systemic Improvements at Signalized
Intersection
Location CM1 CM2 CM3
Project 1 – Signalized Intersection:

S 2nd St and W Las Palmas Ave S02 S20PB S21PB
S02 – Improve signal hardware: lenses, back-plates with retroreflective borders, mounting, size, and number
S20PB – Install advance stop bar before crosswalk (Bicycle Box) S21PB – Modify signal phasing to implement a Leading Pedestrian Interval (LPI) Project 2: Citywide Signal Hardware and Retiming
Location CM1 CM2 CM3
Project 2 – Citywide Signal Hardware and Retiming:

Citywide Signalized Intersections S02 S03 S21PB
S02 – Improve signal hardware: lenses, back-plates with retroreflective borders, mounting, size, and number
S03 – Improve signal timing (co-ordination, phases, red, yellow, or operation) S21PB – Modify signal phasing to implement a Leading Pedestrian Interval (LPI) Non-Signalized Intersections
City of Patterson: High Injury Non-Signalized Intersection

4. S 2nd St & S El Circulo

3. Keystone Pacific Parkway & Park Center Drive

2. Eucalyptus Ave & Highway 33

8. Cornflower Ave & American Eagle Ave

1. Eucalyptus Ave & Sycamore Ave

7. S 7th St & E St

6. S 4th St & E St

5. S 3rd St & E St
1 3
4 5
6 8
2 7
Project 3: Systemic Improvements at Non-signalized
Intersections
Location CM1 CM2 CM3
S 2nd St & S El Circulo NS07
Keystone Pacific Parkway & Park Center Drive NS06 NS07 NS08 Eucalyptus Ave & Highway 33 NS06 NS07 NS08
Cornflower Ave & American Eagle Ave NS06
Eucalyptus Ave & Sycamore Ave NS06 NS07 NS08
NS06 – Install/upgrade larger or additional stop signs or other intersection warning/regulatory signs
NS07 – Upgrade intersection pavement marking (NS.I)
NS08 – Install Flashing Beacons at Stop- Controlled Intersections Project 4: Systemic Improvements at Non-signalized
intersections (mini-roundabouts)
Location CM1
Eucalyptus Ave & Sycamore Ave NS05mr
S 7th St & E St NS05mr
S 4th St & E St NS05mr
S 3rd St & E St NS05mr
NS05mr – Convert intersection to mini- roundabout
Roadway Segments
City of Patterson: High Injury Roadway Segments

6. Las Palmas Ave: East City Limit to 2nd St

5. Sperry Ave: Del Puerto Ave to Walker Ranch
Parkway

1. 2nd St: North City Limit to 0.2 miles south of Walnut Ave

3. American Eagle Ave: Creekside Middle School to
Fawn Lily Dr

4. Sperry Ave: West City Limit to Park Center Dr

2. Baldwin Rd: Henley Pkway to Kohl's Driveway
1 3
4 5
2 6
Project 5: Systemic Improvements at Roadway
Segments (Pedestrian and Bicycle Safety)
Location CM1 CM2 CM3
Las Palmas Ave: East City limit to 2nd St R32PB R35PB
Sperry Ave: Del Puerto Ave to Walker Ranch Parkway R32PB R35PB 2nd St: North City limit to 0.2 miles south of Walnut Ave R01 R32PB R35PB American Eagle Ave: Creekside Middle School to Fawn Lily Dr R32PB Sperry Ave: West City limit to Park Center Dr R01 R32PB Baldwin Rd: Henley Pkwy to Kohl's Driveway R35PB
R01 – Add Segment lighting
R32PB – Install Bike Lanes
R35PB – Install/upgrade pedestrian crossing (with enhanced safety features) Project 6: Citywide Sign Upgrade
Location CM1
Project 6 – Citywide Sign Upgrade
Citywide Roadways R22
R22 – Install/Upgrade signs with new fluorescent sheeting (regulatory or warning)
Note*: Project 6: Assume 20 regulatory and warning
signs per mile, 89 miles= 1780 (round to 1800)
Additional Locations identified from Public Comments and Recommended Countermeasures
Location CM1 CM2
S 2nd St and Sperry Ave NS03
S 9th St and Sperry Ave NS23PB NS11
Heartland Ranch Ave and Shearwater Dr NS02
Ward Ave and Heartland Ranch Ave NS03
Highway 33 and Ward Ave NS11
Calvinson Pkwy: Baldwin Rd and Ward Ave R26 Traffic Calming Non Engineering Strategies
• Education
• Conduct public information and education campaign for intersection safety laws, unsafe speeds, distracted driving, improper turning and driving under the influence. • Conduct bicycle and pedestrian safety campaigns and outreach to raise their awareness of bicycle and pedestrian safety needs through media outlets and social platforms • Implement tactical urbanism/public art projects
• Enforcement
• Targeted enforcement at high-injury locations.
• Increase the number of personnel who have completed Advanced Roadside impaired Driving Enforcement (ARIDE) training
• EMS
• Install emergency vehicle pre-emption systems
• Increase the number of EMS/fire control personnel taking Traffic Incident Management Training Implementation
Evaluate
countermeasures
Continue monitoring
high-risk locations
Approve
LRSP
Implement
countermeasures
under E-strategies
Monitor high-risk
locations
Analyze
performance
measure
Discuss with safety
partners
Evaluate number of
collisions
Update LRSP every + 2-5 years
Successful reduction in
the number of collisions
No reduction in the
number of collisions
Thank You!