Cities Index.
9-28-23_PC_Report_for_CC_Mtg

Patterson City Council
November 7, 2023

Document
9-28-23_PC_Report_for_CC_Mtg
Meeting
November 7, 2023
Body
Patterson City Council
Pages
1
Original file
29.5 MB
Text extracted from the city's file for reading and search. Open the original on pattersonca.iqm2.com. That file is the official record.

1 CITY OF PATTERSON
Planning Commission Staff Report
AT&T Wireless Tower – Community Center
Conditional Use Permit #23-01, Negative Declaration #23-01 September 28, 2023 Meeting

PROJECT SUMMARY
Consideration of a Conditional Use Permit for an unmanned wireless facility (cell tower) located on the north side of West Las Palmas Avenue, approximately 125 feet east of the intersection with Kestrel Drive, 1025 West Las Palmas Avenue, APN 021-070-002. The facility would include an 84.9’ tall decorative bell tower, an 8’x8’ pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. A draft Negative Declaration has been prepared noting that the project would not have a significant impact on the environment under the California Environmental Quality Act.

APPLICANT AND SITE INFORMATION
Applicant: New Cingular Wireless PCS
Property Owner: City of Patterson
Environmental Review: Draft Negative Declaration
Location: North side of W. Las Palmas Ave.,
approximately 125 feet east of Kestrel Dr.

Assessor Parcel Numbers: 021-070-002
Project Size: Approximately 900 sq. ft., excluding an access and utility easement
General Plan Designation: PQP, Public/Quasi-Public
Zoning Designation: PQP, Public/Quasi-Public
Present Use: Existing Vacant Space, Aquatics Center
Surrounding Land Uses: Aquatics Center, Community Center, Tilton Park, Commercial shopping center, Apartments

BACKGROUND
In January 2022, a similar item was presented to the Planning Commission for a cell tower of the same bell tower design at a location on the east side of Ward Avenue, approximately 500 feet north of the intersection with West Las Palmas Avenue. The Planning Commission adopted the Negative Declaration and approved the CUP with a 5-0 vote.

Since the project was located on city land, an agreement was subsequently submitted to the City Council for approval. Some councilmembers expressed concern that locating the cell tower as proposed could restrict development of the future Centennial Park site and the Council recommended that staff work with the applicant on an alternative site. This application represents that new site.
2 PROJECT DESCRIPTION AND ANALYSIS
Conditional use permit review is used to determine whether land use is, and will continue to be, compatible with the current and potential surrounding land uses and to ensure that the use will not become a nuisance to the surrounding land users. Cell towers typically require a conditional use permit due to the potential for aesthetic and maintenance issues associated with a structure of this height and mass.

The project is an unmanned wireless facility, consisting of an 84.9’ tall decorative bell tower, an 8’ x 8’ pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project would be located in a vacant 900 square-foot area near the southwest edge of the Aquatics Center. A minimal access easement would extend from West Las Palmas Avenue to provide all-weather access to the site.

The project site is located on City-owned property that currently includes existing facilities, such as the Aquatics Center, Hammon Senior Center, skate park, and Recreation Department offices. Tilton Park is located to the west.

Aesthetics
To conceal antennas and equipment as much as possible, the Municipal Code requires that all equipment shall be obscured from view or disguised, so as not to appear as telecommunication equipment. The City typically pursues towers disguised as palm trees, related to this requirement, however, in this instance, such a “mono palm” may look out of place. The proposed project includes a tower disguised as a decorative bell tower, and a solid wall to screen the ground equipment from view. The bell tower design was selected to blend with the architecture found in the community generally, and specifically with the surrounding Community Center buildings. The bell would be for aesthetic purposes only and would not be used to generate sound to avoid potential noise conflicts with neighbors.

To further reduce the potential aesthetic impact of cell towers on the skyline, co-location, or the placement of additional equipment on existing towers is encouraged through a staff level approval process. The proposed project includes space allowing for such co-location.

Noise
The project includes a generator to serve the facility during power outages. A noise analysis was prepared and reviewed as part of the environmental review. This study determined that the project would not generate noise levels that are considered significant.

Height
The municipal code allows towers to project a maximum of 15 feet above the maximum height outlined in the zoning district where it is located. The maximum height allowed in the Public/Quasi-Public Zone, where the project is located, is 50’. The 15’ projection would allow a maximum height of 65’. As noted, the applicant is requesting an 84.9’ tower. 3 The Municipal Code (Section 18.84.050 and 18.84.070) also includes provisions, specific to wireless communications towers, allowing the Planning Commission to approve additional height, as long as the tower meets specific criteria:
1) The project is required to show that the additional height is required to provide a more efficient coverage pattern. The applicant has provided information illustrating the existing coverage gap in the localized area and how the tower would fill that gap.
2) The municipal code requires that only facilities that are totally enclosed within a permitted building shall be allowed within two hundred percent of the fall zone of the facility to any existing residential district within the City. The fall zone is considered to be equivalent to the maximum height of the tower. In this case, the nearest residence is more than 200 feet from the tower site, over the required distance.

ENVIRONMENTAL REVIEW
An initial study prepared for this project concludes that the project will not have a significant impact on the environment and a draft negative declaration has been prepared reflecting this.

ALTERNATIVE ACTIONS

1. Determine that the findings for the Negative Declaration, Conditional Use Permit can be made, and motion to adopt Negative Declaration #2023-01 and approve Conditional Use Permit #2023-01 subject to the conditions recommended in the staff report.

2. Determine that the findings for the Negative Declaration, Conditional Use Permit can be made, and motion to adopt Negative Declaration #2023-01 and approve Conditional Use Permit #2023-01 subject to the conditions recommended in the staff report with changes/revisions as may be submitted by the Commission.

3. Determine that the findings for the Negative Declaration, Conditional Use Permit cannot be made and deny Conditional Use Permit #2023-01.

FINDINGS

To adopt the Negative Declaration, the Planning Commission must find the following:

1. The project will not have a significant adverse effect on water or air quality or increase noise levels;

2. The project will not have a significant adverse impact on the flora and fauna of the area;

3. The project will not degrade the aesthetic quality of the area; 4 4. The project will not have a significant adverse impact on traffic or land use;

5. In addition, the project will not:
a. Create impacts which have the potential to degrade the quality of the environment.
b. Create impacts which achieve short-term to the disadvantage of long term environmental goals;
c. Create impacts for a project which are individually limited, but cumulatively considerable;
d. Create environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly;

6. The Negative Declaration was prepared in compliance with CEQA and the CEQA Guidelines.

To approve the conditional use permit, including the additional height, the Planning Commission must find the following:

1. That the requested conditional use permit is consistent with the city general plan and the zoning code; and

2. That the establishment, maintenance, or operation of the proposed use or structure will conform to the requirements and intent of the zoning code; and that such proposed use or structure will not, under the circumstances of the particular case or as conditioned, be injurious or detrimental to the health, safety, or general welfare of persons or property in the vicinity of the proposed use, or to the general welfare of the city.

3. That the information provided demonstrates the height required by the Municipal Code is either infeasible or results in a less efficient development and coverage pattern.

RECOMMENDATION
If the Planning Commission feels that the findings can be made, staff recommends the following conditions:

1. That all conditions of approval shall be printed on corrected plans submitted for permits. The plans shall incorporate all changes resulting from these conditions of approval.

2. All construction shall be subject to the California Building Code and other applicable construction codes as adopted by the City of Patterson.

3. Vehicle access shall be, at a minimum, an all-weather driveway capable of accommodating emergency vehicles, and shall be maintained so that adequate site drainage is maintained, and no mud or silt is carried onto public streets.

4. That the project shall be subject to an encroachment permit.

5. All internal combustion engine driven equipment, including construction 5 equipment and permanently installed power generation equipment, shall be properly maintained and tuned in accordance with manufacturer’s specifications.

Idling of all internal combustion engine powered equipment should be limited to ten minutes at any given time.

6. Any signal interference with the City’s SCADA automated system must be resolved at the expense of the current tower operator.

7. The project applicants shall provide on-air RF studies, within 60 days of activation of the telecommunication equipment demonstrating both FCC compliance and that the site will not interfere with any local signals.

8. All building utilities shall be underground at the point where they enter the equipment shelter.

9. Project grading shall not interfere with the natural flow or adjacent lot drainage and shall not adversely impact downstream properties. Grading plans shall indicate the amount of cut and fill required for the project, including any necessary retaining walls.

10. The project shall be properly maintained in terms of dust accumulation and chipped and/or faded paint, etc.

11. That any on-site illumination shall not be excessive and shall be directed into the site.

12. That the lessee and/or operator of the tower site shall provide a minimum of 30 days’ notice of proposed non-operation or abandonment of improvements at the site. Tower, antennas, and all support equipment shall be removed from the site within 90 days of such abandonment.

13. That a Construction Waste Management Plan shall be submitted to the Public Works Department for review and approval.

14. That a 2A:10B:C or larger fire extinguisher shall be installed at locations as specified by the Fire Chief or his/her designated representative.

15. All disturbed areas, including storage piles, which are not being actively utilized for construction purposes, shall be effectively stabilized of dust emissions using water, chemical stabilizer/suppressant, covered with a tarp or other suitable cover or vegetative ground cover.

16. All on-site unpaved roads and off-site unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant.

17. All land clearing, grubbing, scraping, excavation, land leveling, grading, cut & fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking. 6 18. With the demolition of buildings up to six stories in height, all exterior surfaces of the building shall be wetted during demolition.

19. When materials are transported off-site, all material shall be covered, or effectively wetted to limit visible dust emissions, and at least six inches of freeboard space from the top of the container shall be maintained.

20. All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited except where preceded or accompanied by sufficient wetting to limit the visible dust emissions.) (Use of blower devices is expressly forbidden.)

21. Following the addition of materials to, or the removal of materials from, the surface of outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient water or chemical stabilizer/suppressant.

22. Within urban areas, track-out (earth material deposited on City streets by construction equipment) shall be immediately removed when it extends from the site and at the end of each workday.

23. Any site shall prevent carryout and track-out.

24. Limit traffic speeds on unpaved roads to 15 mph;

25. Install sandbags or other erosion control measures to prevent silt runoff to public roadways from sites with a slope greater than one percent.

26. Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving the site;

27. Install wind breaks at windward side(s) of construction areas;

28. Suspend excavation and grading activity when winds exceed 20 mph;

29. Limit area subject to excavation, grading, and other construction activity at any one time. Regardless of wind speed, an owner/operator must comply with Regulation VIII’s 20 percent opacity limitation.

30. Project shall install a Knox Key Box as required by the Fire Department.

31. That the project shall be subject to review and approval by the Stanislaus County Airport Land Use Commission.
7 32. That the project shall comply with all applicable State and Municipal Codes, and meet the requirements of the Public Works Director, City Engineer, Building Official, Community Development Director, and Fire Chief.

33. That the applicant shall indemnify, defend, and hold harmless the City of Patterson, its agents, officers, and employees from any and all claims, actions, or proceedings against the City of Patterson, its agents, officers and employees to attack, set aside, void, or annul, any approval by the City of Patterson and its advisory agency, appeal board, or legislative body concerning the project, which action is brought within the time period provided for by the Government Code of the State of California. The City of Patterson shall promptly notify the applicant of any claim, action or proceeding and shall cooperate fully in the defense. If the City fails to do so, the applicant shall not thereafter be responsible to defend, indemnify or hold the City harmless.

Respectfully submitted,
Joel Andrews
City Planner
Attachments
Project plans
Draft Negative Declaration
Initial Study
Environmental Noise Assessment
Radio Frequency – Electromagnetic Energy (RF-EME) Compliance Report Coverage maps
Central Valley Regional Water Quality Control Board letter Public Notice
-----
a
INITIATIVE / PROJECT: NSB
USID#: 324890
FA LOCATION CODE: 14758136
RFDS ID #: 5542661
RFDS VERSION: 3.00
RFDS DA TE: 03/07/2023
PACE JOB#: MRSFR053894
PTN#: 3701AOKTMF

PROJECT DESCRIPTION
A (N) I\T&l UNIAANNED TELEC0\41AUNICATION FACILITY CONSISllNG OF INSTALLING· (N) LEASE AREA W/ (N) WIC (WAUHN-CABINEl), & (NJ OIESEL GENERATOR, & (N) UTILITIES TO (N) SITE LOCATION , {N) BELL TOWc:R W/ (N) MHENNAS & ANTnlNA EaUIPIAENT INSIDE

PROJECT INFORMATION
AT&T SITE NUMBER: CVL01687
AT&T SITE NAME: PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363
JURISDICTION: CITY OF PATTERSON
APN: D21-070-002
SITE TYPE: WIC (WALK-IN CABINET)
/ BELL TOWER

VICINITY MAP
~ ~, ·•
' ·~ - Q
. ' / 1
~
SIT_~ LOCATION~
~ , ~
. ~ 9 9
~- \
\\ ~ 9 :

CODE COMPLIANCE All WORK & IAATERIALS SHAU RF PERFORMED & INSTALLED IN ACCORDM-JCE \',1TH Tl-ff CURRENT EDlllONS or THE f'OLLOIYING COD[S AS ADOPTED BY HI[ LOCAL GOVERNING AUTHORITl[S NOlHING IN THESf PLANS IS TO BE CONSTRUED TO PERIAIT WORK NOT CONFORMING TO lHESE CODES:
20:n CALir RNIA AOMINISTRMIVE CODE, PARI 1, TITLE 24 CCR 20n CAI lr RNIA llUlt DING COO[ (CllC). PART ], VOi.UM[ l&;l, nm ◄ CCR (7021 INTERNATIONAL BUILDING CODE J..ND 2022 CAlir RNIA A\4ENOM[NTS) 7022 CALlfORNIA [l[CTRICAL CODE (C[C), PART J, TITLE 24 CCR (2020 "-IATIONAL [L[ClRICAL CODE AND 2022 CAUrORNIA AM[NDIA[NTS) 2022 CAL!r RNIA MECHANICAL CODE {CMC) PART 4, TlTLE 24 CCR, (2021 UNIFORIA "4ECHANICAL COOE ANO 2022 CALIFORNIA AMENDMENTS) 2022 CALIFORNIA PLUMBING CODE {CPC), PART 5, TntE 24 CC R (2021 UNIFORIA PLUMBING CODE ANO 2022 CALIFORNIA A"4ENOl.mns) 2022 CALIFORNIA ENERGY COO[ (CEC), PART 6, TITLE 2~ CCR 2022 CAUr RNIA FIRE CODE. PART 9, TITLE 24 CCR
SITENAIAE:
smr
COUNTY:

PATTERSON
CVL016B7

STANISLAUS
CITYOFPAllERSON
021-070-002
~ . \ \ SHE A.CQUISITION COMPANY: COMPLETE
2009 V SlREEI WIRELESS CONSULTING I ~
SA.CRAMENfO, CA 95818
LEASING CONTACT AWi ROCKY CORDOVA ·\ \
(2021 INTERNATIONAL FIRE CODE AND 2022 CALIFORNIA Aij[NDMENTS) 2022 CALIFORNIA GREEN BUI\.DING STANDARDS CODE, PART 11, TITLE 24 CCR 2022 CALIFORNIA REFERENCED STAN01.RDS, PART 12, TITLE 24 CC.R ANSI/EIA-TIA-222-H
ALONG wrn-t ANY OTHER APPLIC1.BL[ LOCAL & STATE LAWS AND REGULATIONS JURISDICllON;
APN
sm:A00R[SS:

CURRENT ZONING:

CONSTRUCll0NTVfl[:

OCCUPANCY TYPE:

POWER·
LJ,TITUDE:

LONGITUDE:

GROUND ElEVAIION:

PROPERTY OWNER
APPLICANT:
1025 W LAS PAUAAS AV[
PATlERS0N,CA95J6J
0/0P /PUD (PUBLIC / OUASI-PUBUC-PLANNEO
UNIT DEVELOPl,lEfH)
V-B
U, (UNI.IANNEO COIAIAUNICATIONS FACILITY)

IURLOCKIRRIGATIONDISTRICT
N JT 28' 0077" NAD SJ
N37466882'NAD8J
I lfr Off ,ll,,0' WiD U W 121 H2557k N/\D 8J
119' AMSL

CITY OF PATTERSON
P,O, BOX 667
PAT1ER50N,CA9536J
.I.T&T MD111LITY
5001 mcUTJVEPARKW.I.Y
SAN R.I.YDN, C.I. 9458J
(916)616-0468 , 1 RCOROOVACCOMPLETE'MRELESSNET ,_ ______________________ -4 ZONING CONTACT: ATTN t.lATT MOOR[
CONSrRUCIION CONTACl·
{916) 247-JOH

MMOORECICOMPLETEWIRELESSNET

BECHTEL
KEllHCONNER
(40B)JD6-JBOI

CKCONNEROBECHTCL COM

DRIVING DIRECTIONS
F'ROl.l· 5001 EX[CUTIVE PARKWAY, S/\N RAMON, C.f. 945BJ TO: 1025 W LAS PAL\4AS A\/f., PATTERSON, CA 9536)
1 IIEAD SOUTIIOCST
2 TURN RIGHT
J TURN LEFl TOWARD EXECUTIVE PKWY
4 TURN RIGHT TOWARD EXECUTIVE PKWY
5 TURN RIGH [ ON ro EXECU11Vt PKWY
6 TURN RIGHT ONTO CAMINO RAMON
7 USE THE RIGHT 2 LANES TO TURN RIGHT ONTO BOLLINGER CANYON RD 8 US[ TIIE RIGIIT LAN[ TO "4ERC[ ONTO I-6B0 S \11/1 nic RA"4P TO SAN JOSE 9 "4ERGEONTOl-6BOS
10 USE THE RIGHT 2 LANES TD TAKE EXIT JOA 10 MERGE ONTO I-SBOE

TOWARD STOCKTON
11 1 TAKE THE INTERSTATE 580 EXIT TOWARD INTERSTATE 5 S/FRESNO/lOS ANGELES 12 CONTINUfONTOl-5BOE
l J ~C',(TOH1~l11
11, TAKE EXIT 04 TOWARD SPERRY AVE/DIABLO GRANDE PKWY
15 TURN LEFT ONTO CA-lJO
16 TURN LEFT ONTO W LAS PALMAS A.VE
17 TURNlEFT
18 TURN LEFT
END AT: 1025 W LA.S PAUAA.S AVE, PAl1ERSON, CA 95J6J
ESlllAAITDTI"4E:571.lINUlES ES1IMA1EODISTANCE:576"4ILES JJrT
J12 H
164FT
295FT
021.11
06"41
051,41
021,41
~ 0 1,41
2051.11
I81.ll

15..1 Ml
119 Ml
02"41
20MI
OJI.II
171FT
128FT

DISABLED ACCESS REQUIREMENTS
IHIS FACILITY IS UNMANNED & NOT FOR HUI.AAN HABITAllON DISABLED ACCESS & REOUIRE"4EN[S A.RE NOl REQUIRED IN /ICCORDANCE 'MTH CALIFORNIA STATE BUILDING CODE, TITLE 24 PARl 2, SECTION 118-2035 SHEET
T-1.1
C-1
A-11
A-1.2
A-21
A-J 1
A-41
A-'12
E-11
0"5ClilPTPU

TITLE SHEET

TOPOGRAPHIC SURVEY

OVERALL SITE PLAN
EQUIPMEN1 PLAN

ANTENNA PLAN

ELEVATIONS

ANTENNA DETAILS
EQUIPMENT DETAIi S

ELECTRICAL PLAN
SHEET INDEX ~Ell I SH<ET Dt 1rn~
CVL01687

PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363

PREPARED FOR
~at&t
fo~~
0 ~!~~~.':.,';~..,~~r~i
,-=
CDIIPl.ETE ~ W'll'llMt c.w.iloltlh~l, lfllt.
.UU SIIENO C~'\CllW
PROJECrNO:
0t.41\11j,l'J l •. 11tWAJII
c:Hl!,~ra:ii n 1, 01'.J\'¥
.,UP'tc,ifft.111'
'O.\U~~J.t.J\n,
I
I
, oiiMmh=Wt111![\t ,;:;;_
, rt>l'»m ID lCO,. tc
l w:1UD lct•U11:W ,I.C
c 11i,iiun , .... ,.,, M a!i I lll..i.lin-1n ,,.

PRELIMINARY:

NOT FOR

CONSTRUCTION
!([VIN R SORENSEN
54469
7 I • ~i]:;;r,·.~:1:.~ia~.~fii~:'.: l..CME••o~,,"'"''occ""'''" ··, • :l::;t:°!! - \lm •
:, ;5~! ~J.
~ ,I ·~• C;:i ''ff ~ I
.,.,1 == ·•! •·· '
·;J~ " I
. -== _;; "'"l ' Ill &~ "e I· ·ruP. ,· i - ~,5@ I u l I I I , I)! 1 H!l - · . ~u; . r!ill ;
!:'MU'Tflfl!:

TITLE SHEET
L I ~· .. r ~1.1
Q
I
,......
- -.«
'" ~
-------
dVLo 1887 Patter~on

PLOT PLAN AND
'8TE TOPOGRAPHY
\,
~at&t
,_,,MOBILITY
. j i ~~ §
,'/ ! i~ I gij ~
no j !i?. g
~:~ /a E
! ! - J:: l
~~ij ~ ~
p 2 0
I ~ ~
'-. ~ m
t
~
~
II
0 l
N01£: NO TECHNICIAN PARKlt,H, AT SITE
l.'IJST PARK IN PARKING LOT & WAU(
TO Sll[ FROM PARtUNG LOT.
-------------
{[) BUlDING
APN:
021 - 070- 001 j
!Ji
te l
II
I
I
I
(N) ,\T/.d 20'-o• l\lOE

NON-EXCLUSIVE ACCESS
&: UTILITY EASDAENT
I .4.l&-T TO SUPf'lY &: INSTALL (N) 4" SCH 40 PVC COOIXJll IN J6" OC[P TROICH sru6BCD OUT or mANSllJRU[R PAD
W/ POl'i£R ~l<[R O DI> CF COHDUIT
I
I
AT&T TO l0CA1[ rns11m: 4• CONDUIT /;
'~ / / iii:

SlUB,
INSTALL CONNECT {N) 4" 4" SCH CONOIJIT 40 P\JC & CONOUJT SUPPLY :A 1N59"0££PTRENCH8[l'M:EN ~
1AA.IHORl,ICRPAO&:C0001.JITST\J9 \ \
~ , , ,._ ... (E) 10'-0"'MOEPUBUCUTILITY ~ ,
USCM[IIT PCR 38/UAPS/53 ~~~\.._ __ iJ~--.;:;. i!, ~
AT&T TO SUPPLY & INSTALL (N) ~&"X~"
ffi'.NSrORU[R PAD Vf/ 13.1.FlRICR POST
Ar&l lO SUPl'L '!' & INSU,LL (N) 2" SCH. 40 PVC CONDI.Ill W/ 2/0 mlPLEX IN BETWEEN (N) TRANSFORI.IER PAD & (N)
IAETER PANEL IN (N) J6" DEEP TRENCH, APPROX, 60'
(N) Al&l J'-0V1'-o" U/G VAULT W/ mAmc
RA TrO l 10 roo rem "U[[l I.![" POINT & (N)
,H&:T naER POC
SHEARWATER DRIVE 0
'• r:----- f'O"l•IYL'I...:.....__.,_ - - -- - - ::) ---~ --------=.::::::_-_ _.:::-_:_: __ "\-.. : _____ ~ --7------Q_ . .. ,tt,,.,,.< ~~-l£!:{U.!1tt ,ti J.e~-~/U
, 0• WI!)( PUBLIC
(U11~~TY [Ai~~:5;~~
APN:
021-070-002
T(Olt.fOlN P.&RKING
SPiit[
i
(P) AT.T NOHXClUSVE
{[)BUI.DI~ ~ (N)~Tdi:T 10·-o·moc l!Otl-[XaUSIVE ACCESS
& UTILITY [ASEUENT
(E)lRANSrQRM(R
([) PAD ,ou,n:o~ - DROP lRAMSFORI.IER rr, I lt-r..El
I
I
I ~ , : , .... , ....
'I
([) DROP INlCT =
\'}
// / c::::::=JD , , ,, ,' , , ,r ,'
I
I
I
J
"\_(() S"'1EPARK'\_
-------- --------
• .
• •

LAS PALM AS A VENUE
lw
15 If-
~ OVERALL SITE PLAN l" 0'-0 '
~ "'
I
I I
I eo· o· (t_ Ol"·.,,-r
r
~ '.'.!
<(
51 el:

CVL01687

PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363

PREPARED FOR
~at&t
$c,~.:!,~~~::'!~du
CDnPLETe ~ Wlreln, Coneultlno, Int.
·,H l 1fflfl'f0 OWlW
,.-oJt-tf'«i>
CI U ff'-111 f.J,11.1,¥.1 11'1
CHECUD BY. J. GRAY
,IINCl'YIO .. ,
DI.UUIA.!Ul-
""' ~ x..,o•
·-
PRELIMINARY:

NOT FOR

CONSTRUCTION
KEVINR SORENSEN 54469
~I<~ , n<A1DN 0'•1'.W!O,,.,I\ P(e()N.
'"lW "'l•~"!•cr.,cu,a•ouf Uttc •o-.or,.,c:,.uo-«11fl:"..0W1 f,r,tlOlf• IO"-!ll•locoocUtJ11• ..
=-f.·1 i ii:! .:::::,
-~
!!
~ "
1J1tnm•t.
• - 111!1 ~~; ,;ii
•!- :Iii, ,., ;J" Vi !l1i1
,; , l' jl •h I~ i!! I ·u,! t!o ,h, ]~~ •Hll
.~; i,,,11 i w II

OVERALL

SITE PLAN
[ ""'"~A~ 1 . 1
(t,i) 8Ell TOWER "'/ (U) AT&.1 ANlHlNAS
& ANl[NSA [OUIFl.t[NT INSIOC. sec AUlCNIJA FLAli, Stl[ET A-2 1 (tl) ROCK W/ 'MID OARlll[R
THROUGHOOT l[A.S[ AR[A
{II) 41&1 l[CH LIGHT
(N)10·-o·xs·- o· CONCRETE GENER,\lOR SL/1.8
(N))OKWOIESELGENERATOROtJ 190 GALLON UL H2 RATED FUEL TANK & I E\JH 2 ACOUSTIC [NQOSUR[
(N)Al&.l JO'-O"XJ0'- 0"
(900 SO Fl) LEASE A.REA
,~·-o·
(N) AT&T UTILITY H-FRAVE AlTr\CHED 10 \I/IC (WALK-IN CABINET) W/ {N) R,\YC,.,P DC50 SURGE SUPPRESSION BOX, {N) FIBER Pl.Al CAN & {N) 2A:ro8CRr\TEOFIR[EXTIOOJISliERIN\\£AMRRESISTANTCAB:NET
+--------------------,0·-o· •
r 6."-1----------u· rr-----------+-- -t-s·+-,,4---- -
' ' ' ' '
--------------------------------:
' , (◄) (N) 4l&l nern TRUNK CABLIS
', & (12) (N) AT&T DC POWtR lRUNK
, CAOL(S A TTACHCD 10 (N) BELL .A
',,, TOll{R WALL tlSIIJ[ TO ANTENNAS ----;"
..... ,✓
', ,' ' , ', ,~ ' ,
I
I A- --- 1
I
I
' I
: I
I
I , ,,
,r
I
I
I •
', ~' I
>< : , ' 1 , ' I
/ ~ I
,," ',.. : , ' I
,' ', I , .,. I
,/ ',, : ; /,,,, ,,____ l 1 'l_,.
," , .. : f5 !------!
(N) HI/AC UNIT PROVIDED
W/ 'l'tlC [WALK- IN C/..Bf.lIT)
(N) SHl[LO[O OONil llLT LIGHT WITH WTIOH
SENSOR & AUIO SI IUTOff TUCR PRWOEO
l'ITTH WIC {W.UK-tl CAllllO). l'IP or (1)
(N} AT&l GPS ANIENl<IA
(N)RFRACK l 2
---(N)RFRACKfl
(N) POWER l"I.ANT RA( K W/ (2) STRINGS

OF BATTERIES
(N) AT&T WIC (WALK-IN CAGIN[l)
ON (NJ 6'-0·1s·-o· CONCR[T[ SL.AB
(N}.4.T&l 200A [L[ClRICAL PANEL
W/ ATS & (Al,I LOCK LUC BOX
{N) ACCESS OOOR ;;' ', I ~ L , ' I I , P---~---11----~~---""- ' : •·-0-- ',1 a: q' Q. (N) J'-o· X 4'-o· CONCRETE STOOP
,·
----------------4 ~ / I (N) .I.TltT 4· U/G CONDUIT, A / O • ,I.PPROX 25' FRO~ CIEW. W/ '7 I lELCO BOX BELO\\' 10 mo f5 <;> / PUll C4.N ~ SHELTER ¥.'ALL vV {Nl AT&T J'-o· c.
_.,,,., ,,,,- I """"" --......... ,l
~,,.,,....• ; "'
/ "
"
~ Y, , .., . ,,,, A~/\ I I 1 1 \ ti
M ATltT U/G GENER.ATOR ")t CONDUITS, Arl'RO:< JO' I ---- "tl381.:l - ~381.:l (N) Altl ~· U/G COUOUH FCft Q. ...-----nee~ r1arR FROM POC TO (N) ClfNA. W/ \ _,,;) lCLCO BOX BELON, 4?1'ROX 25'~~
0 ------/ - / _,,,'
L ,-1- ~ "1 i '
. " ,, \ I I , \ c..

I I I , ' \ I ~ w
• / \_ c.. ~ ~ , --- {N) FIR[ O[ PARTU HIT • , , ' r.1mxoox 11 •-r 1 • u·~•· '- ··•· I ,.,' ':i,_ «. I I ( / ~@ I (N)AT&:T12-0"~1DEDOUBLE
~ ~ _,.,- r~-- ~ !~~NE~:~;~/0R~~~~~:;;:L
(N) AT&T J"-o· CLEARANCE
(N) AT & T 2" U/G COHOUIT FOR
PO\l,'ER FROU (tl) ~[T[R PANEL TO
(N) (l[ClRICAL PANt:l, APPROX 10'
(N) UlllllY H- FRA.W: W/ (H) All.ti
21l0AMP METER PM£l W/ DISCOtl-l[CT
& (N) C{ NA, W/ TElCO 80:< BELOW
(N) AT&T 6'-0" TALL CIJU WALL
, * ~-~•~ IP MEN T PLAN ::~'~,:~; t1~"1::ic,r,:~~"1'" \ji7 1 (N) IRAUSf"OklJ!:R PAO .t (II) WE IER PAW£l K)-«L..5 T r IN (N) J6" O[lP IR(IICH, Af'PROIC 60' ~IIM ' \.'11'
CVL0l687

PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363

PREPARED FOR
~at&t
h•~~'~!~~~~:,t-.;~l
CCflFLETE ~ W4• it.1Nt CoNU~t,.loO..
.,,_ILi 111-lnb aiutlW
rtOJl;Ct tllO
OIAfflf U l,J J'EW~ ~J
Qill~• r I. GiA't
Allffl'(f?IIIT •
1'1Ulfl lA.,Ul,
·-

PRELIMINARY

NOT FOR

CONSTRUCTION

KEVINR SORENSEN
S4-¢69
,c, \U,< l p-io, l ~I\ 109 >>S, P(P..0-,
u,• fS"llll•>'l>C"OC U'ICUh•
~ (C11:,J! Of> ICf •t:.1 0 NOllf!:O•IO I

1..c.u1• •0 •,11• 11 ir.[JQ(; uo.mn
. - ... ~~ !
. ~a ~ ;:,tll it ~Ii ·a Ji
~;!!! .\· ; id S!' .___ I ,, I .z::;; cl!~ : i .l
,...,1111.1

EQUIPMENT
PLAN
['"W~A~1.2
(N) ATkl RRUS - 684J 82/866.\. IW
Of 6, Off (H) UtUSlR\Jl eELOW
AHTENf.lAS
SECIOR
Al Al
~ I /1:J
~ I A.:l
RI
82 8]
G Cl
A
" C1
" A CJ
D D1 [
l D1
.

T
DJ
AHlENNA. UOOU NO
CCI - IPA- 5R-KU8.\11-K
ERICSSON AIR5419 077G & AIRG40 8770
CO .. TPll-45R-l<UBAA-K
CCI • IPA-45R-KUBAA-K
ERICSS0NAIR6419B77C&AIR644987i0
CCI • 1PA-~5P-KUBM-K
CCl • TPA-45R-KUl!AA-K
ERICSSON AIR6419 877C ,le >lf~6449 8770
ca - 1PA-45R-KUBAA-K
CCI TPA-45R-KU5AA·K
ERICSSON A\R6419 877G & AIR6H9 A7m
CCI TJIA-451!-KUSAA-K
(N) Rf SCHEDUlE
I A.111.!UIH CENIERUIE I RRUt-0'5 111:l,IOOtL #
-rn·-o· IU) 4_44!1 BS/e12. (I) BB4J 87/B66A
t 76'-9" & ±7J'-2°IINTEGRATED
±1 ·-o· 10, •u1_~11 _(!)_ s&U OJ/IM,>
,,. tU'-0'" l( 1) _!449B5/B11,(1)BA4J87/866A
,,. t75'-9" & ±7J'-2'l1NTECRATED
270 +H·-o· l(IJ ~.u@ m\ [•> ~•l .,,.~u.
"" ±1 '-o" H1J 444!1 BS/812, (1J BB,:s B2/B66A
''" t76'-9" & ±7J'-2'IINTEG!UTED
180 :t74'-0" 1(1) 478814, (1) BB J 82/A66A
.. Hf-o" lr,1) 449 e~/812. (1) 88 :3 B2/1366A
,. t76'-9" & :flJ'-2' l!NT[CRAT[D
"' :t7f-O" {1) 478B14,(1)68 J82/B 66A
RrDS OAT[ 0l/ 01/23
RrDSRCV J OO
(N)FRPTUB(COlU!AN,TYP
(N) FRP TUBE GIRT ABOVE & B£LOW
ANl[NNAS,TYP(FRPlUBEGIRlABOVE
ANlENNASNOlSH0MlFORQARITY)
--~:IV- ) (N) Al&l FIBER IRUNK CABLES
"p==----Fl---,====,ef="'F"=-===== ... 1/1 ~A~~~)s(~;T:~:o~/(N):c~~UN~ I T0'N[P. WAf.L \~D[ TO ANT[NN/,S ~""270'

SECTOOB
(1-J)FOAl.!ROOfA!IO\'[,lOB[
DCSIGNCD ~ [NCI.NE(R[O DY OTH(RS
r-2·
h P
~
~
;,z •1u j;;
...

ANTENNA PLAN
if•(·O"
T•'f
,.,,.
' I
I
I
L-,""
1 I
I
I
•, I
-----"'
~ ~ ( i
Alli.I~

SCCTORD
(2) (N) AT&T AN'JENHAS

VCRTICALLYSTACKEOTHIS
POSlllON ONLY, TYP EACH SEClOR
(N)ACCESSHATCH
'~" ,r...,~• rc:-c1 r:.t,NH ""'" l~'!-!1' 3.1~<:0ll~or .. ~ ' '"' lll o<> I • I •
'""'' SHARED 51!,IJi[D
S11,V!CD SIIARED Sll-~(0
' '""' (l)DC9
SH,IJiED SHARED SHARED
SH,iJiED SHARED SHARED
' .... (l)DC9
SIi.iMO Sl!ARLD SIIARCD
''"'"' SHARED SHAR(O
,,., (l)OC9
"""" ""'" """ ""'"' SHARED """ NOIE:

I ANlEh'l,/A POSITIONS Al![ un TO l!IGHT rRou rRONT Of" IJH[NMA. 2_ £OOIPIA[NT IS PREllUt.A.RY & SUOJ(CI TO CHANCC
CVL01687

PATTERSON
1025 W LAS PALMAS AVE
PATTERSON, CA 95363
PREPARE0FOR
~at&t
!,a~.:.!::~~r!: .. ~~ln
\'.,.;ricr

CCXIFLETE
~ Wlreleu Con ultlng, Inc,
CYl.OlMJ
lURY.UI
J,0,l'A1
tatlffl-'Wl
i c..,._
PRELIMINARY:
~IOT FOR

CONSTRUCTION
l<E\111-J R SORENSEN S4469
n1<,vpv11:mo,1~w,o•,in"IO::Oi'< u,~ rs: ,~[• ~oe ~c••,c; u,,:11• 11~ r..- 1c1a.m ~ 11C:lrQ0 ,..,,r-::;,c.,~, (..e;OJl[OID , .. IO l ~O...C .... \l o,! I
:

I-"ll I ·; :
=
. -
~i!! ,ii!
•:-
!~~
ii! tp
•<I
~~r
~8!
i!;[i I"!' di'! 11,l!
·'JI' !Ml
11!1!
!l!li
dlll

ANTENNA PLAN
~HEHNU~BO
A-2.1
(:1) ROOF ~,'(tH
(N) FAN IUS()( W/
TEW'ERAnJRE SEIJSOR &
~UTOUIITIC GN/0rr s,·~TCH
(t-J) At-JTEWU L0O,TIOtJ
rRP lOU\lRS
(N) RA DIO LOCAII0W
FRP PMmSW/ SIUCCO
flNISHTQl.4ATCH
(N) JAJ.IITENAIICE PlAifORl.4
l~ISIOE W/ ACCfSS OPEttNC &
(N) ACCCSS LAOCl(R O(IOW
(tl)n&TD1[5£l
GfHLPA. 10/
(II) A.T&T lf-D' TALL
RLOCt:CREIE WALL
(N) l.41CRQll'AV[ 0ISII
L0C,,TION
STuCCOEtl(RIOR
' '
: :-LlID: '.=: 11, l-J
~ H -----· - ----- ,[!] --------- -1
r-,
r-,
,-,
t-i
,_,
, _J l-J
I I f-·1
,-,
1:1
EAST ELEVATION Jfl&.·•1· o·
~l t
, .. ,
fRP PAt.lHS 'N/ SIUCCO
rll/15H i0 IJ.\TCH
11cv,o01
• b'.g' ~GI
(N) BELL 101'0 10 EE 0ESti;tlED
k. H/Cf.lW!En AY OTHERS
(N) J.T&T 1'11C (WALK-IN CAlllN[T)
(N) AT&T CPS t.lJT[N/1/..
(H) AT&T IC[ GRI0G( W/ (U)
rlfFP TRUHK CM!L[S t, (II)
DC POl,ffi TRUii( CI\BL(S
~~n_ o·•C>' .A, Ci L
rP.P P-1,NCLS w/ srucco
nt,JISH TO MATCH
(N)Alk.117'-0"'Mru:0OlJf>.F
SYrNGSOLIDC~RUGATE0
UETAL ACCESS GI- T~
(N) BELL TOWER TO !JC D[StCtJCO
&HIGINWIED BY0lHlRS
(N) AT&T DIESEL

GENERAHR
(N) 1.1&1 a·-o· l ~LL
!lL0CKCP.[ I[ WAIi
t· o·
' ,-..
~
• '',
' ,
-r~r I
SOUTH ELEVATION 3/16"=1'-0"
~
(1J)R00:-•1t~T
(N)fl.HUJSIOC'N/
TEIIPfRATURE SfNSOR &
1-UlOUAllC OU/Off SWITCH
{H) .I.HTE/Jt/.1. LOCATION
rRP lOUV[RS
(ll)RAOt0L0O,TICN
rRFI Flf,U[LS W/ SlUCC0
flfllSH 10 ~AlCH
(ti) llAlllffllAt/(.£ PIAlfOill,I
IHSIDE "« / ACCESS OPENING &
(tl) ACCESS l~D[)[R BHOW
(N) ~tlCR!lWA'I( DISH
t OCATIOtl
srucco EXT(RICR
(tJ) AT&T ICE BRIDGE V. /( I)
flBfR TRUt,r, C,1,BLES & (t-J)
OC POWER TRUtlt< CABL[S
(N) AT&T 111C (VIAU(-!~ CA.BINET)
(H) AT&T CPS AtlTEHUA
(N) flil[ O[PARUl(tll l(tJOX ox
(N)SITES1GN/..CE
CVL01687

PATTERSON
\025 W LAS PALMAS AVE
PATTERSON, CA 9536J
PREPAfi'EDFO.!
~at&t
Jo,~c.,~:.:.~~-:,,e~:,~~l
(&)
CDfflPLETE
Wlul .... Col!W~f'CI.I.IIC.
·~1AtW. ,r.1. CV\OIW
H OA.e,JOC,,
0~AWN8Y T.STEWART
Cl~.C-ltDI! J G.!AY
~ 'fUI I
11,SW: :JIA1U)
PRELIMINARY:
~IOT FOR

CONSTRUCTION
~EVIN R SO!'IENS~N
S4~69
r:;,,,c,.,o,,o,,,,.ro~•"•'"L•->•• U'll l~•-C••-t •("1~ C.UIOl•I•( ,..-erc<1or,,ci,ao....,11-;::,o.r•1 1.u..-1• ,.,,.,,~,...,,...cuu(•II ~.! ~•I
1 1
r
1 . irir ~ ii - ·• ~ ; ti, l 1 ~g j
.::; ~~ !

SI-IEETTITLE
,1•'1
j,•l!! j
,r', 1!,h ·•li' iMI
11:11
i}Hi
'!!!!
!1·· .,, 11

ELEVATIONS
('"m•A:3.1
CCI 1PA-45R-KU8AA-K
(01
l
J

LEF L VIEW FRONT VIEW
ANTENNA DETAIL CD ,s·.?-o· IAAK Yl{IGH1: 67 6 LBS

ERICSSOO
RRUS-4~ 9 B5/812
1 ''"11 I

SIDE VIEW
C"',J
8 TOP VIEW

FRONT VIEW
RRUS-4449 B5/B12 DETAIL ® l "• I•~• \4AK WEIGHT: 71 LBS CRIC:.SSON AIR 6419
B77C/C - 8,i.ND 5£CTOR ANl[t,,l,IA 1j

TOP VIEW
7 (.1111
J
SI D 1 ____Y'.!.E_JY_ FRONT VIEW
ANTENNA DETAIL CDr=1·-o· l.4AK wrQH ss.4 LBS
= m:sSON
''"'·"""/86'03or view
8IJ8 . 1,011 U .:: _1

SIDE VIEW FRONT VIEW
RRUS-8843 B2 B66 DETAIL
6 1"•1•- o• IAA)( WEIGHT 75 LBS
[RIC5S01~ Al'R 6H9
B77D/C -84HD SECTOR IJ.JTHJNA

TOP VIEW
7 (306")
~J
SIDE _ Vl[W FRON T VIEW
ANTENNA DETAIL Q), .... 1'-fJ' \IAKY,{ICHT: B8 LBS
@ @.C:

TOP VIEW TOP VIEW W/ MOUNT
•
~~::.6().24-BMV
SURGE SUPPR[SSOR --~-
r 1
(J1k4") r =-iot'- l•H1
,,..,, '
J.-(11J"}-

FRONT VIEW FRONT VIEW W/ MOUNT
0~~0~GI:. SUPPRl:.SSO~, Esf =T,~IL~
r-(1'-40")7

ERICSSON
RRus • ..,,,,. OP Vl[W
'(!•"1t
rm r~1, Lill L u

SIDE VIEW FRONT VIEW
RRU S-4478 814 DETAIL ©r .. 1•--0• \IA)( Wt:JGHT: 594 LBS CVL01687

PATTERSON
1025 W tAS PALM AS AVE
PATTERSON, CA 95363

PREPARED FOR
~at&t
1001&ecuTtwPmtw"'I'
JnnRarrmn.Calf1>1nlaUS8l
·-(&)
COfflPLETE
W-lf•1"AColl•t1~1 jM.

MUUIIHQ 61-:0-IW
PHUfCl 1.i>
011,t,YWH"l' l, l U'WAII
QIC'o.ro .,. I. CRAY11.nllllA,M
PRELIMINARY:

NOT FOR

CONSTRUCTION
KEVINR~ENSEN
S4~69
•111,'Dl,.IOO,Ol'IIW fO • l•N n~.D<
U,~l\lll'll~Al'["CIO.O U1u•1"(
Ga'CC1C...OfAI C l·UD""""•!!.0,,,•1 lNC,tl(lO IO>l!IOIIISD..C~•I•• J
• t
-·,
·""4' ~ .
·a.- ~
-
_,,,,
c:::; I I
Ul(f)i.,
• - u;:l ~}i HJi .. : •'~ "'~• d t l:.1 11 I
m ·1i111
mUi ~!
1 ,ii, "• ! •11 !! 111 iu! ,JU

ANTENNA

DETAILS
['"m"A~4.1
GPSl,NTENNA
0 0
0 UIJSTRUT
rR.w.c .I.S R[O
llUSSllAR
0 0 0
>-----1ro1---~
s~
Sli:HOlD 00\l-ll IR.1
llGlil W/ lt.OltOt/
SWSOR k AUTO
SHuTorr 11~1rn
200>\ JO CIRCUITLOAO
CENTER W/ AUTOM.1.TIC
TR.lNSf[R SWITCH

ACC(SS DOOR

TOP VIEW

C,PS MH(NNA
SHIELDED OOW>J TILT LIG~T
W/ 1,10110N S£NSOR f.•
.t.UTO SHUTCff TIIJ[R

CPS ANTCIINA
200.1.JOCIRCUIT
LOAD CENTER W/ AUTQ~.t,TIC
TIUNSF'ER S"1TCH
""" CENEIUTQf! M(RFACt:
(~·••A·l
LlJ -11,..-l.j

BUSS BAR
>----( .. 01,---..J

FRONT VIEW
JO K ... GEN(RA lOR SDO.lO
0 ~~-S CABIN[T DET~!,~
[
( 6ll'. 1 1 11 , __ ,..)
(Jl,'1

FRONT VIEW
190 CAL UL
142 TANK
(916")--f
11h 1 , ,, , :u7
J
c,,,oi
I l~I --11 ,, --.- 1\ c::J~{J1
' I j [ I
n- >-----1,ou-i

SJDE VIEW
30KW GENERA TOR DETAIL CD 1r.,· ..rr l,jAx ML wrICHr ◄. ss Les TOP
t="'"'.=:1 r .
,~, I m
l. •tt••t••!t••t . • . FRON T
RAYCAP
DCSO-~B-60-96-50,
Eh'Cl.OSUR[
1'(9"l'f'
SIDE
RAYCAP DC50 DETAIL CD k "-1'0~ MAX WEIGHT: 165 LBS
[B3-!' l!il>
,.,._, TOP VIEW
1~••"H
L
HIERSON NUSURE 721
Ot ~~ .lf..»tl 'l,i:,(

FRONT VIEW
(D~{~. DC POWl:.R PLAN I .,,~0,~~
1(168")7
L l I I

TOP VIEW
D m~
FRONT_VIEW RIGt:!l_ VI[_½'
CN 3931 DETAIL © l~..,l'- D" ,•1't 11011 :"1\11~
r 1"'
0 •
1 1
I I I

FRONT VIEW
" (u·,
E.LECIRICIIL PANEL 10 MH.l
COYU[RCIAL PG&'.E REQUIREMENTS
WllHTfSTRYPASS
MILBANK MOOEL fU21dM1BL
:200 AJAP l.£TER/D~OtNECT

OR EOOIVALENT
LJ
SlDE VIEW
~ TER DETAIL
~
l PAC!flC IEClfllCALSOLUllONS PTSJ70H515
(Al>1
J

SIDE VIEW
>-(iU").J,

FRONT VIEW
FIF RACK DETAIL CD Jr•l"-C" YAX \IC!GIIT: 180
INT[RS(CT
PTLC-ATS-JS-12200-CL_ATT
POWER POWER TRANSrER LOAOCABIN[T
1•~•1
CP

TOP VIEW
n r'f GOJ INTERSECT
~ (l;oO"J 0

LEFT VIEW FRONT VIEW RIGHLVIEW
El_ECTRICAL PANEL
CABINET DETAIL ®)(' ~--- o• II.AX 'fltJCi1I. 1)0 LBS
CVL01687

PATTERSON
1025 W lAS PALMAS AVE
PATTERSON, CA 95363
f'5C, Alt(QJQI:
~at&t
,:~g~~~~~~:,t-;~u
COIIPLETE ~ 'Mn,!•1Con1:iddffvi,._,
·,uuwr-.o CV\01 .. I
H O.IC'Clt.O •
Cli! o1.w101, t. tmYA.tll
Qlt-'l«O IL~ J. Ql'A,Y
,1tr,uvu, 1, •
lllU£U'i1\Jl.

PRELIMINARY:
~IOT FOR

CONSTRUCTION
~[VIN R SORENSEN 54~6'1
, ~••n 1•ro-,or,,,. ,o•,,,. .. ~..o-1 .,. ...... . ,.. .. n 1:;nu:. ~11u1a , .. U'IICl,:;,IOJI. ICft<CIOPf0/1~.o,u, ( >£1'.((• IO<llf0l>cDOC UO.llo ~
•
'
.!!,! li~I
~ =
Mrlffl\l.

I~! ~·! •h
!i!
111
l.ii !~i
~~ I JP~
~u~
j!;!I
11n,
hi•;
11,!1
UU'
111!1
P' '!''I
1m1
ill!!

EQUIPMENT

DETAILS
[ '""~A~4.2
CL[CTRICAL l[G[NO
@
®
n
-4-
0 :0:

JL

IAECHANICAL INIERLOCK
IAElER
CIRCUITBR[AKEA
SCR\llC[ GROUND

WIRED CONNECTION
TIIAER SWITCH, WAlERPROOF

OUTDOOR UGI IT

GFI OUTLET, WATERPROOF
(N) JOKW DIESEL GENERATOR
..I
Mfl'iWi'':;DOC'l'OICI
WI, t1''-SSiS ro "=" C,W.O~Bf'ID/1
C
a
,.
,:/
a
(◄) llO, W/110 GND, IN¾" C
(4) f10, W/flO CND, IN¾" C
GFI OUTlET

WATERPROOF
(E)4"CONOUITSTU8,CONN[CT4"CONDUIT INCOl.41NGSER\llCE
~
g
"-
1 <>
& SUPPLY & INSTALL (N) ~- SCH 40 PVC
CONDUITIN59"DEEPTRENCHBETWEEN

TRANSFORIAER PAO & CONDUIT STUB
(N) 200A AT&T METER PANEL W/
DISCONNECT ON (N) Ull1TY
H-rRAL.4[ 111510( AT&T LEASE AR[A
~ ()) J/0, IF. GND, ')" C0NDUIT,APPR0X ,0'
:1 t! " "- :5
ta
e'
~
~
f'ERUlJUTY
IJ&C
1,y
PTLC-ATS-JS-12200-CL_ATT
(◄) f12, W/112 GND. IN 1·c
Ii

SINGLE LINE DIAGRAM
EXT£RIOR
LIGHT
(N) PAD MDUNl[D
lRMJSFDRIAER
(N) 2" SCH 40 PVC CONDUIT W/ 2/0
lRIPI.ElCINBETWEEN(N)TRANSFORIAER
PAD & (N) IAElER PANEL IN (N) J6"
DEEPlRENCH,APPRDX 60'
(N)200AELECIRICALPANEL-'11ACHEO
10 SIDE Of (N) Al&.l 'MC (WALK-IN
CABINET)INSIDE(N)ATrtTLEASEAREA
(N) AT&T CAI.I-LO:< CEN[RIITOR INTCRrACE
(<I-) ilO, W/110 GND, IN¾" C
(4) ,10. W/110 GND, IN¾" C
fliWIJ'l.,\i[ : PIJitl,A
Lo:AbO!rl t OUlff!C
LIOUUM · 1H
.. .. LOAD VA LOAD VA
mo u.-,, tl20
IJ,O
1320
lJl'/1
""' mo 1!10

1.!-JG
UJO IJ20
'"" Tlillll ,,.
9700 9520
'.!Of"'-'t" • .,..,,
(N) 200A AT&T
METER W/ DISCONfl[Cl
tQPU'~.ACl
(N)UNISIRUT,JVP
:J
~ RAME ELEVATION

PANEL SCHEDULE
Sl:U'dl. 1 11,VOO 'la~'1Vt' 'l'IIV.lJ
eJSJ.~J(IOA
BKR "'"'""-
'" .. LOAfl DESCRIPTION /MP/ CIRCUITt,10 IYP/ LOAD DESCRIPTION " LOAD VA LOAD VA POLE POLE m1n.• 1 -= I , ---..,, .IJCTJU ,1 'Ji'O
- 1 ' . l.!lO ll!mu: YJn • • ,on lttlfO. U>ll . I ' . .,,. 1r,1ttt J ,. , ' .. ,.,, RI.C':.-0' TJNl . " " - 1.UO
in:arm1 ,.,, " ,, jffl ll[t;ll'(R 10 UlO . ,. .. - ,,,.. fr(,TRR I 70/l " .. >171 IUt1fD If UlO . " "' - ,,,. Jl!C!tMUI "1n ,, n "'" RtCTll'O 11. IJ,O . lJ ,. . ,,,. tNAC I ,~ ,. ,. :.0/1 EllrJ.:IIM. utK'T/Wi'I.D ICP1 .,., - " " ,.,, &lltOO aC<II RECEPTACLE 20/1 29 JO 20/1 BATTERY HE1iTER BLOCK 250 '""' PHASE TOTALS PHASE TOTALS B470 7920 'ID'IU .IJIIPS , ..
• ...... ,fw
CVL01687

PATTERSON
102$ \V W PAlMAI AVE
PA!l~ON,CA•).)1.3

PREPARED FOR
eat&t
SOOIEJacullVl!~arlway
5anRam:1r1,CaTla1n1a,Hel
·-
COfllPLETE ~ Wff.,_,Cot-111J11,rn0,. lr,,a,.
1,IUUlllilO C.\'t.OtW
N'Oll'Cl>.o
Cl:&wt,j~T LUtwJiar
CHll!flD I.Y J l;.l!lif
..,.f't:DW01l •
Ci\\lESfAiM

PRELIMINARY

NOT FOR

CONSTRUCTION
K[VIN R. SORENSEN
5~~69
111,,-0,.iONor,.,, roo~,,, P1.r-..o,,.
uruss11,1•>01•c1~,:;.,.,Dl•11,c
C:..A:IONC)r~(C!•"H) POOl(='L
CNG~rH I 10•,11•oe1DU::LWErJI
•
~i·1 .~
. 1.: ~
·: ~ i· =
~~! 5•! d.
a;;; :i
~Ji
liJ
lJ<
••I .,.
~i]
:8; i •
U;~I ,,ii,
•jhl
~!H;
11111
111''1 I,!!
um
!l!ll
,nu

ELECTRICAL PLAN
E-1.1
AT&T Wireless
,l\ d v a ,1: c ~ S ,i ,m=z-7 ) 1.ont,H"1ttJl•1i •
1r1.•;Vil1,
CVLO 1687 Patterson
1025 W. Las Pa/mas Avenue, Patterson, CA
Photosims Produced on 12-14-2022
Shot Point Map
·~ · AT&T Wireless CVL0/687 Parrerson
I 025 W. Las Patmos Ave,we, Parcerson, CA
Photosims Produced on 12-14-2022
Existing
Proposed
"='
ATa.T Wireless CVLO 1687 Pallerson
1025 W. Los Pa/mas Avenue, Parcerson, CA
PhotosfnH Produced on 1 i-1.1-2022
Existing
1-D ' l-oposea
O ,1
Proposed AT&T
Installation
ATr.T Wireless CVLO 1687 Parterson
1025 W. las Pa/mas Avenue, Pcmerson, CA
Photos rms Proclu ce cl on 12- 14-2022
Proposed
ATCaT Wireless CVLO i 687 Patterson
7 025 W. Los Pa/mas Avenue. Patrerson, CA
Photos irn s P1 od ucecl on 12-14-2022

ITY OF PATTERSON

COMMUNITY DEVELOPMENT DEPARTMENT
PO BOX667, PATTERSON, CALIFORNIA 95363
(209) 895-8020, FAX (209) 895-8019

PROPOSED

NEGATIVE DECLARATION
A notice, pursuant to the California Environmental Quality Act of 1970, as amended (Public Resources Code 21,000, et. seq.) that the project for AT&T Wireless Tower - Community Center which, when implemented, will not have a significant impact on the environment.

PROJECT TITLE: AT&T Wireless Tower - Community Center
PROJECT LOCATION: APN 021-070-002, North side of West Las Palmas Avenue, approximately 125 feet east of the intersection with Kestrel Drive, City of Patterson, County of Stanislaus DESCRIPTION OF PROJECT: The construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, an 8'x8' pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in the Public/Quasi-Public zone.

FINDINGS AND BASIS FOR A NEGATIVE DECLARATION:

1. The project will not adversely affect water or air quality or increase noise levels;

2. The project will not have adverse impacts on the flora and fauna of the area;

3. The project will not degrade the aesthetic quality of the area;

4. The project will not have adverse impacts on traffic or land use;

5. In addition, the project will not:
a. Create impacts which have the potential to degrade the quality of the environment; b. Create impacts which achieve short-term to the disadvantage of long term environmental goals; c. Create impacts for a project which are individually limited, but cumulatively considerable; d. Create environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly;
The City of Patterson has, therefore, determined that the potential environmental impact of the project is insignificant.

MITIGATION MEASURES INCLUDED IN THE PROJECT. IF ANY, TO AVOID POTENTIALLY SIGNIFICANT EFFECTS: NIA
INITIAL STUDY: The City of Patterson Community Development Depa1tment has reviewed the potential environmental impacts of this project and has found that the probable impacts are potentially insignificant. A copy of the Initial Study is attached.

REVIEW PERIOD: June 29, 2023 through July 31, 2023
All comments regarding correctness, completeness, or adequacy of this Negative Declaration must be received by the City of Patterson Community Development Department, PO Box 667, Patterson, CA DATE:
95363 or
June
at (209)
29, 2023
895-8020, no later
SIGNATURE:
than 5:00 p.rn. on July
~~
31,202
--- ~
_ . ~
Joel Andrews, City Planner
Phone: (209) 895-8020 Email:[email protected]

CITY OF PATTERSON
Initial Study of Environmental Impact
I. Summary of Findings
Project Name: AT&T Wireless Tower - Community Center - Project Description: The project assessed by this initial study considers the construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, a 8' x 8' pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in the Public/Quasi:-Public Zone.

Sources: This initial study was prepared using the Patterson Zoning Ordinance, 2010 General Plan, 2010 General Plan EIR, and the City's guidelines for the implementation of CEQA.

Applicant: City of Patterson, 1 Plaza, PO Box 667, Patterson, CA 95363 Recommendation: Negative Declaration
Location: North side of West Las Palmas Avenue, approximately 125 feet east of the intersection with Kestrel Drive, 1025 West Las Palmas Avenue, Patterson, CA 95363 - Assessor Parcel Numbers 021-070-002
Date: June 29, 2023
II. Project Description
The project assessed by this initial study considers the construction and operation of an unmanned wireless facility, consisting of an 84.9' tall decorative bell tower, an 8'x8' precast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in Public/Quasi-Public Zone, on a site approved for community center facilities.

Environmental Setting
The project site is generally vacant and is part of an undeveloped section of the Community Center project, a City of Patterson project that includes existing facilities such as the Aquatics Center, Hammon Senior Center, skate park, and Recreation Deparbnent offices. The master plan for this area includes additional community center space and an expansion of the aquatics center. Development bordering the site includes Tilton Park and the Las Palrnas Senior Apartments complex to the west, single family housing to the north, vacant land zoned for commercial development to the east, and the True Value shopp~g center to the south. See Figure 1. No off-site work is planned. See,Figure 2.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 1 Figure 1- Project Location
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 2 Figure 2 - Project Site
(£) 8"U>NG •-.,.

APN:
021-070-001
I
I
I
I
g/
t;-1
l!
I
I
(E) CONCRElr SOE\IIALX "' •
I
(N) AT&T s·-O·0·-o· U/G VAULT W/ TR.-FAC
RATI!J Lil FOft f'l3m "MEET Jilt :IQINT a: (N)
AT&T ABER POC ·
SHEARWA !ER DRIVE
APN:
021-070-002

SEE EQUIPMENT PLAN,
SHEET A-1 2
.,. --- (P} lil6:1 Ntl.'f-'Dt\USVC . l£0"'1CI.ON p- SP4C£ OVERALL Sl"E PLAN
i ·r
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 3 T
Figure 3- Enlarged Project Area
Oil ua:, em rCIER 'ff/ [NJ ATli:i .lH!0'11AS.t:AHIDlll•ECIJPuOITNSI)[, S'EE .oNmflA PUH, g.m ,.,_2.1- '".., (N)ffDQ('ff/'llaO~
MlllJGHCtlt~IJIEA ••
(N)AI.I IW11.MI
(N)ID'•lft5·-o· CIJIGElrlDIOIAfll!ISUB- -,
(NJ u.,,, JO"-o•x:;o•-o· (soason)LWE"-"EA • •
,1- 1,
' I
'
!
I
EOUIPl,F IT PLt.N J(, ... ,;"
' l • c
-•- (N)HW,CI.IITJ>RIMlED
W/IICf'AIJJ(- UICAata)
--- -~~~~ wnt«ti,u"-HW:!19),m>OICZJ ~~
-- (N)U&TG5$N,'19f,11,
··· -11,v.a.1:1-'J'~
- ... . · (•! "'" t'V,/QQOl#f0/1. ~~i~;:; \~ •• -IN)Ul'CITYH~W/\H)AlkT ~ l,HR J>All!l. W/t1500t<il:tt
"' Ct400U."/WDIIOIBO.OI!
• - l!l)F'RtOUM!llEJll
"""'" f"J AT,tl 11' t" ~ l!OUIU
S°iUICS(U)comllJCUtllUIT41,
o\Ct1'!SGA1':•/SITr~GII~
!N}.Ut:IYU/(; Q:)'11111 1011
PJ'll[Jlnt(W,OC:fO (H)lroA61P
Kr'-' ' NEJ.. >.PP'-00 ~!ti'
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 4 Ill. Initial Study Environmental Checklist
This section discusses potential environmental impacts associated with approval of the proposed project.

The following guidance, adapted from Appendix I of the State CEQA Guidelines, was followed in answering the checklist questions:

1. A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the discussion. A "No Impact" answer is adequately supported if the discussion shows that the impact simply does not apply to projects like the one involved ( e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained when it is based on project-specific factors as well as general standards ( e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis).

2. All answers must take account of the whole action involved, including offsite as well as onsite, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.

3. All analyses must be based on a comparison between conditions that would occur if the project were implemented and existing conditions (also known as baseline conditions).

4. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect is significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required.

5. "Potentially Significant unless Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less-Than-Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less-than-significant level (mitigation measures from earlier analyses may be cross-referenced).

6. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration (State CEQA Guidelines Section 15063[c][D]). Earlier analyses are discussed in the project description above under "Previous Environmental Documents and Site-Specific Information".

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 5 The discussion that follows each section of checklist questions:
• analyzes previously certified environmental analysis and/or mitigation relevant to the issue, including the potential for each effect to be significant and adverse and standard requirements and measures that will preclude adverse impacts; • describes proposed measures that will preclude adverse impacts; • analyzes the potential for residual or remaining significant adverse impacts following implementation of the project and all previously identified, standard, and proposed requirements and measures; and
• summarizes the applicable. mitigation measures established by the various support documents and project-specific measures that will reduce the impacts to a less-thansignificant level.

Identification of the potential for residual significant adverse environmental impacts would trigger the need for preparation of an EIR. For issue areas in which no significant adverse impact would result or impacts would be reduced to a less-than-significant level by mitigation, further analysis is not required.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 6 I. LAND USE AND PLANNING
Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Issues Incorporated
Would the proposal:
a. Conflict with general plan designation or zoning? ■
b. Conflict with applicable environmental plans or ■
policies adopted by agencies with jurisdiction over
he project?
C. Be incompatible with existing land use in the ■
!Vicinity?
d. Affect agricultural resources or operations (e.g., ■ impacts on soils or farmlands, or impacts from
incompatible land uses)?
e. Disrupt or divide the physical arrangement of an ■
established community (including a low-income or
!minority community)?
Setting/
The project consists of a wireless communication facility consisting of an 84.9' tower and associated equipment within the Public/Quasi-Public General Plan District and the Public/Quasi-Public Zone.

Discussion
a,c. "Public Utility Structures" are permitted with a conditional use permit in the Public/Quasi-Public Zone. The municipal code allows a maximum height of 60' for communication equipment in the Public/Quasi-Public zone. However, the Planning Commission may approve an exception where additional height above the maximum may be approved, provided that the applicant submits information demonstrating that the increased height is necessary for a more efficient development and coverage pattern. In this instance, the applicant is requesting an exception to allow the additional 24.9' in height with information showing that the increased height adequately serves coverage gaps in cell service in and around the City of Patterson. The code also includes provisions related to minimum distances for towers from residences and residential zones. The project is located at least 180 feet from the nearest existing residence, sufficiently distant to meet required "fall distance" criteria.

The project has been designed with the look of a decorative bell tower with mission revival-style architectural elements, both to screen the cell tower use and to blend in with the surrounding development contemplated as part of the Community Center project.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 7 Conclusion
The proposed project is not anticipated to significantly impact agricultural land or land use compatibility.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 8 II. POPULATION AND HOUSING
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Cumulatively exceed official regional or local •
population projections?
b. Induce substantial growth in an area either •
directly or indirectly (e.g., through projects in an
undeveloped area or extension of major
infrastructure)?
C. Displace existing housing, especially affordable ■
housing?
Setting/Discussion
The project consists of wireless communication equipment in an undeveloped area. No impact to population or housing is anticipated.

Conclusion
The project will not have an impact on housing or population.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 9 III. GEOLOGIC HAZARDS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Woula the proposal result in or expose people to potential impacts involvin5!:
a. Fault rupture? ■
~- Seismic j1,"rOund shaking? ■
C. Seismic ground failure, including liquefaction? ■
d . Seiche, tsunami, or volcanic hazard? ■
e. Landslides or mudflows? ■
f. Erosion, changes in topography or unstable soil ■
conditions from excavation, grading, or fill?
g. Subsidence of the land? ■
h. Expansive soils? ■
i. Unique geologic or physical features? ■
Setting
The area is within a zone of low seismic activity. All impacts have been addressed in the General Plan EIR. No significant soils effects or geological problems are expected, which cannot be addressed through the use of current engineering standards adopted by the City and State.

Discussion
f.,h. Grading and excavation required to implement install equipment related to the project create the possibility of unstable soil conditions. However, no significant soils effects or geological problems are expected, which can not be addressed through the use of current engineering standards adopted by the City and State.

Conclusion
The project will not result in impacts relating to geologic hazards considered to be significant.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 10 IV. DRAINAGE AND WATER SUPPLY
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in:
a. Changes in absorption rates, drainage patterns, or ■ he rate and amount of surface runoff?
b. Exposure of people or property to water-related ■
nazards such as flooding?
C. Discharge into surface waters or other alteration of ■ 15urface water quality (e.g., temperature, dissolved
oxygen or turbidity)?
d. Changes in the amount of surface water in any water ■ body?
e. Changes in currents, or the course or direction of ■ twater movements?
f. Change in the quantity of ground waters, either ■
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations or
hrough substantial loss of groundwater recharge
capability?
g. Alteration to the direction or rate of flow of ■
groundwater?
h. Impacts on groundwater quality? ■
i. Substantial reduction in the amount of groundwater ■ otherwise available for public water supplies?
Setting/ Discussion
Construction of the project would not have an effect on procurement, distribution or quality of drinking water.

Conclusion
The project is not expected to result in significant impacts relating to drainage and water quality or quantity.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 11 V. AIR QUALITY
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
lncorporated
Would the proposal:
a. Violate any air quality standard or contribute to an ■ existing or projected air quality violation?
b. Expose sensitive receptors to pollutants? ■
.... Alter air movement, moisture, or temperature, or • K:ause any change in climate?
kl. Create objectionable odors? ■
Setting
Currently, the San Joaquin Valley Air Basin is classified as a "Severe non-attainment" area for both the federal and State standards for ozone and a "serious" non-attainment area for the federal standard for respirable particulate matter (PM10, or particles 10 microns or smaller in diameter). Emissions of these air pollutants, and their precursors, will increase as a result of motor vehicle trips generated by the project, and from grading and construction operations. Together, these activities may hinder efforts to achieve and maintain air quality standards established by federal and State laws.

Discussion
a. Development of the project site will result in short-term air pollutant emissions and dust generation from construction activities. Such activities will generate short-term fugitive dust and vehicle exhaust emissions as a result of excavation, grading, and constructionrelated vehicle trips.

Construction Emissions
A project's construction phase produces many types of emissions, but PM-10 is the pollutant of greatest concern. PM-10 emissions can result from a variety of construction activities, including excavation, grading, demolition, vehicle travel on paved and unpaved surfaces, and vehicle exhaust. Construction-related emissions can cause substantial increases in localized concentrations of PM-10, as well as affecting PM-10 compliance with ambient air quality standards on a regional basis. Particulate emissions from construction activities can lead to adverse health effects as well as nuisance concerns such as reduced visibility and soiling of exposed surfaces.

The SJVUAPCD's approach to CEQA analyses of construction impacts is to require implementation of effective and comprehensive control measures rather than to require CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 12 detailed quantification of emissions. PM-10 emitted during construction can vary greatly depending on the level of activity, the specific operations taking place, the equipment being operated, local soils, weather conditions, and other factors, making quantification difficult. Despite this variability in emissions, experience has shown that there are a number of feasible control measures that can be reasonably implemented to significantly reduce PM-10 emissions from construction. The SJVUAPCD has determined that compliance with Regulation VIII for all sites and implementation of all other control measures as appropriate, depending on the size and location of the project site will constitute sufficient mitigation to reduce PM-10 impacts to a level considered less-thansignificant.

San Joaquin Valley Unified Air Pollution Control District air quality mitigation measures are already included as mitigations for all projects as standard procedure to address these issues. Additionally, appropriate policies are dealt with in the 2010 General Plan EIR:

The City shall require all of the following as a condition of project approval of future development projects:
• All disturbed areas, including storage piles, which are not being actively utilized for construction purposes, shall be effectively stabilized of dust emissions using water, chemical stabilizer/suppressant, covered with a tarp or other suitable cover or vegetative ground cover.
• All on,site unpaved roads and 0££,site unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant. • All land clearing, grubbing, scraping, excavation, land leveling, grading, cut &: fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking.
• With the demolition of buildings up to six stories in height, all exterior surfaces of the building shall be wet during demolition.
• When materials are transported of£,site, all material shall be covered, or effectively wetted to limit visible dust emissions, and at least six inches of freeboard space from the top of the container shall be maintained.
• All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited except where preceded or accompanied by sufficient wetting to limit the visible dust emissions.) (Use of blower devices is expressly forbidden.) • Following the addition of materials to, or the removal of materials from, the surface of outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient water or chemical stabilizer/suppressant. • Within urban areas, track,out ( earth material deposited on City streets by construction equipment) shall be immediately removed when it extends 50 or more feet from the site and at the end of each workday.
• Any site with 150 or more vehicle trips per day shall prevent carryout and track,out. • Limit traffic speeds on unpaved roads to 15 mph;
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 13 • Install sandbags or other erosion control measures to prevent silt runoff to public roadways from sites with a slope greater than one percent. • Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving the site;
• Install wind breaks at windward side( s) of construction areas; • Suspend excavation and grading activity when winds exceed 20 mph; and limit area subject to excavation, grading, and other construction activity at any one time. Regardless of wind speed, an owner/operator must comply with Regulation VIII's 20 percent opacity limitation.
a. Impacts associated with the project are related to construction activities. temporary and have been addressed through the listed measures. significant impact is anticipated.

Conclusion
The project will not result in significant impacts to air quality.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 14 Such impacts are
As a result, no
VI. TRANSPORTATION/CIRCULATION
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in:
~- Increased vehicle trips or traffic congestion? ■
b. Hazards to safety from design features ( e.g., ■
sharp curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
Inadequate emergency access or access to nearby ■
tuses?
kl. Insufficient parking capacity onsite or offsite? ■
~- Hazards or barriers for pedestrians or bicyclists? ■ f. Conflicts with adopted policies supporting ■
alternative transportation (e.g., bus turnouts, bicycle racks)?
g. Rail, waterborne, or air traffic impacts? ■
Discussion
a. Construction of the project would incrementally add vehicle trips that are necessary to transport construction equipment, materials and personnel to the project site while the project is built.

Such impacts are not considered significant.

Conclusion
The project will not result in significant impacts to transportation or circulation systems.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 15 VII. BIOLOGICAL RESOURCES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in impacts on:
a. Endangered, threatened or rare species or their ■
habitats (including, but not limited to, plants, fish,
!insects, animals, and birds)?
!b. Locally designated species (e.g., heritage ■
trees)?
C. Locally designated natural communities (e.g., ■
oak forest)?
d. Wetland habitat (e.g., marsh, riparian, and ■
vernal pool)?
e. Wildlife dispersal or migration corridors? ■
Setting/Discussion
Endangered, threatened, or rare species in the Patterson area include the San Joaquin Kit Fox (Vulpes macrotis mutica), Swainson's Hawk (Buteo swainsoni), Western Pond Turtle (Clemmys marmorata), and Burrowing Owl (Athene cunicularia). The San Joaquin Kit Fox's preferred habitat is grassland and rolling hills. Swainson's Hawk and Burrowing Owl both prefer grasslands.

The project is located on vacant land, previously used for agricultural purposes in an otherwise urbanized area. Potential impacts associated with biological resources were addressed in the 2010 General Plan EIR.

Conclusion
The project will not result in significant impacts to biological resources.

CITY OF PATTERSON1 INITIAL STUDY OF ENVIRONMENTAL IMPACT 16 VIII. ENERGY AND MINERAL RESOURCES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in:
a. Conflict with adopted energy conservation ■
plans?
b. Use nonrenewable resources in a wasteful and ■
inefficient manner?
... "' Result in the loss of availability of a known ■
mineral resource that would be of future value to
the region and the residents of the state?
Discussion
The project will result in an incremental increase to the use of non-renewable energy sources.

Conclusion
The project would not result in a significant increase in the use of energy or mineral resources.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 17 IX. HAZARDS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the propos(I/ involve:
~- A risk of accidental explosion or release of •
!hazardous substances (including, but not limited
•o, oil, pesticides, chemicals, or radiation)?
b. Possible interference with an emergency •
response plan or emergency evacuation plan?
The creation of any health hazard or potential •
!health hazard?
d. Exposure of people to existing sources of •
potential health hazards?
e. Increased fire hazard in areas with flammable •
brush, grass, or trees?
Discussion
A Radio Frequency Electromagnetic Energy Compliance Report was prepared for the proposed project. The study determines potential exposure levels for the facility and compares that information to the Federal Communications Commission's Maximum Permissible Exposure Limits for both members of the public and those accessing the site for work related duties. The study determined that, under a worst case scenario, there is no modeled exposure for either occupational or the general public uses under FCC's limits.

The project is not expected to create or increase hazards.

Conclusion
The project will have a less than significant impact on health and safety.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 18 X. NOISE
Issues Potentially Potentially Less- No
Significant Significant Than- Impact
Impact unless Significan
Mitigation timpact
Incorporated
Would the proposal result in:
a. Increases in existing noise levels? ■
b. Exposure of people to severe noise levels? ■
Setting
The Noise Element of the General Plan provides goals, policies, and implementation measures intended to reduce the adverse effects of noise. The Noise Element sets standards for the maximum allowable noise exposure from transportation sources as summarized on Table HS-3, below.

Outdoor Activity Areas1 Interior Spaces
Land Use Ldn/CNEL, Dbldn/CNEL, dbleq, Db2
Residential 603 45
Transient Lodging 603 45
Hospitals, Nursing Homes 603 45
Theaters, Auditoriums, Music Halls 35
Churches, Meeting Halls 603 40
Office Buildings 603 45
Schools, Libraries, Museums 45
Playgrounds, Neighborhood Parks 70

1. vVhere the location of outdoor activity areas is unknown, the exterior noise level standard shall be applied to the property line of the receiving land use.

1. As determined for a typical worst-case hour during periods of use.

2. Where it is not possible to reduce noise in outdoor activity areas to 60 Db Ldn/CNEL or less using a practical application of the best available noise reduction measures, an exterior noise level of up to 65 Db Ldn/CNEL may be allowed, provided that available exterior noise level reduction measures have been implemented and interior noise levels are in compliance with this table.

Noise is typically expressed in decibels (dB). U,.e decibel scale is logarithmic because of the physical characteristics associated with noise transmission and reception. For example, a

3.0 decibel ( dB) increase in noise levels normally results in a doubling of noise energy; however, because of the structure of the human auditory system, a 10-decibel increase is required to perceive a doubling of noise. A l- to 2-decibel change in ambient noise levels is CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 19 generally not perceptible to the human ear. The A-weighted decibel (dBA) incorporates the human ear's sensitivity to sounds of different frequencies. On this scale, the sound level of normal talking is about 60 to 65 dBA.

Noise levels diminish (or attenuate) as distance from the source increases based on an inverse square rule, but the rate constant varies with the type of sound source. Sound from point sources, such as industrial facilities, attenuates at a rate of 6 dBA per doubling of distance. Heavily-traveled roads with few gaps in traffic behave as continuous line sources with an attenuation rate of 3 dBA per doubling of distance. Otherwise, roads typically have an attenuation rate of 4.5 dBA.

Construction work is the main source of noise as a result of the project.

A noise study was prepared for the project which reviewed predicted noise levels associated with the operation of the facility. The study determined that the project's noise exposure would be less than the City's required noise generation maximum requirements.

No ongoing significant noise impacts are expected as a result of this project.

Discussion
a., b. Noise levels on the project site will increase as a result of construction activities associated with the project. Such noise is temporary and is not considered significant.

Noise from the generator is not expected to exceed noise standards outlined in the 2010 General Plan EIR. No significant ongoing impacts are anticipated.

Conclusion
Noise levels resulting from construction and operation of the project have been addressed and can be mitigated per the 2010 General Plan EIR.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 20 XI. PUBLIC SERVICES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal have an effect upon, or result in a
need for new or altered government services in any of the "ollowin!i; areas:
a. Fire protection? ■
~- Police protection? ■
c. Schools? ■
d. Maintenance of public facilities, including roads? ■ e. Other governmental services? ■
Setting/Discussion
The project is not expected to affect the need for services. The project would result in increased wireless communication coverage to the westside of the City of Patterson.

Conclusion
The project will not result in a significant impact on the need for and maintenance of public services.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 21 XII. UTILITIES AND SERVICE SYSTEMS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal result in a need for new systems or
r,supplies, or substantial alterations to the following utilities:
~- Power or natural gas? ■
b. Communications systems? ■
c. Local or regional water treatment or distribution ■
facilities?
d. Sewer or septic tanks? ■
e. Stormwater drainage? ■
£. Solid waste disposal? ■
g. Local or regional water supplies? ■
Setting/Discussion
The project would increase the availability of signals for wireless networking, which is the purpose of the project. No other new utilities or service systems are anticipated as related to this project.

Conclusion
The project will not result in a significant impact to utility or service systems.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 22 XIII. AESTHETICS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Affect a scenic vista or scenic highway? ■
p. Have a demonstrable negative aesthetic effect? • C. Create light or glare? ■ Setting/Discussion
b. The project would be disguised as a decorative bell tower, designed to complement surrounding proposed development in the Community Center area, so as not to appear as telecommunication equipment. Further, the project site will be surrounded by a solid wall.

The limited scale and massing of the cell tower facility renders negative aesthetic effects as less than significant.

Conclusion
The project will not have a significant adverse effect on the aesthetic quality of the City.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 23 XIV. CULTURAL RESOURCES
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Disturb paleontological resources? •
I:>. Disturb archaeological resources? • C. Affect historical resources? • d. Have the potential to cause a physical change •
which would affect unique ethnic cultural values?
~- Restrict existing religious or sacred uses within •
~he potential impact area?
Setting
A review of relevant archaeological literature found no evidence of prehistoric, historic or archeological sites within the project vicinity according to the archival record. The construction project is subject to mitigation measures from the 2010 General Plan EIR. If cultural resources are unearthed during excavation or construction, the project will be halted and appropriate agencies will be contacted for further site assessment.

Conclusion
Development of the project site will have no effect on archaeological, historic or paleontological resources.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 24 XV. RECREATION
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Increase the demand for neighborhood or ■
regional parks or other recreational facilities?
b. Affect existing recreational opportunities? ■
Setting/Discussion
The project will not result in a significant impact to recreational resources. The project would be located in a regional park/community center area and has been designed to fit within the overall concept and placed in an unobtrusive location.

Conclusion
Project related impacts to recreation facilities and opportunities are considered less than significant.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 25 XVI. GREENHOUSE GAS EMISSIONS
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
Would the proposal:
a. Generate greenhouse gas emissions, either •
directly or indirectly, that may have a significant
impact on the environment?
b. Conflict with an applicable plan, policy or •
regulation adopted for the purpose of reducing the
emissions of greenhouse gases?
Setting/Discussion
a-b) The proposed project was analyzed for potential greenhouse gas emissions impacts within the City of Patterson General Plan EIR, that provided several mitigation measures, to which the project would be subject. The project represents a incremental and limited use, when compared with the baseline land use assumptions as analyzed in the General Plan EIR, therefore, greenhouse gas emissions impacts would be less than significant.

Additionally, the proposed project would not conflict with an applicable plan, policy, or regulation intended to reduce the emissions of greenhouse gases.

Conclusion
Project related impacts related to greenhouse gas emissions are considered less than significant.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 26 XVII. MANDATORY FINDINGS OF SIGNIFICANCE
Issues Potentially Potentially Less-Than- No
Significant Significant Significant Impact
Impact unless Impact
Mitigation
Incorporated
~- Does the project have the potential to degrade the ■ quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten o eliminate a plant or animal community, reduce the
tnumber or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory?
p. Does the project have the potential to achieve short- ■ term, to the disadvantage of long-term, environmental
goals?
C. Does the project have impacts that are individually ■ limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a
project are considerable when viewed in connection with he effects of past projects, the effects of other current [projects, and the effects of probable future projects.) d. Does the project have environmental effects that will ■ cause substantial adverse effects on human beings, either directly or indirectly?
Discussion of Checklist Answers
The project is not expected to result in significant adverse impacts on the environment.

CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 27 XVII. Determination
In accordance with Sections 15152 and 15168 of the State CEQA Guidelines, this initial study has been prepared to evaluate the potential impacts of the proposed project.

On the basis of this initial evaluation:

I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. _K__ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described in the initial study. A NEGATIVE DECLARATION will be prepared.

I find that the project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMP ACT REPORT is required.

I find that the proposed project MAY have a significant effect(s) on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets, if the effect is a "potentially significant impact" or "potentially significant unless mitigated." An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.

I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects (a) have been analyzed adequately in an earlier EIR pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project.
au~ {,L j, ]J
/ Joel Andrews Date
City Planner
City of Patterson
(209) 895-8024
CITY OF PATTERSON, INITIAL STUDY OF ENVIRONMENTAL IMPACT 28 Environmental Noise Assessment
CVL01687 AT&T Cellular Facility
Patterson, California
BAC Job# 2022-172
Prepared For:

Complete Wireless Consulting
Attn: Steve Proo
2009 V Street
Sacramento, CA 95818
Prepared By:

Bollard Acoustical Consultants, Inc.

Dario Gotchet, Principal Consultant
December 19, 2022

BOLLARD
Acoustical Consultants
Bollard Acoustical Consultants, Inc. • P.O. Box 7968, Auburn, CA. 95604 • Phone: (530) 537-2328 • bacnoise.com Bollard Acoustical Consultants, Inc.

Introduction
The CVL01687 AT&T Wireless Unmanned Telecommunications Facility Project (project) proposes the installation of cellular equipment within a lease area located at 1025 W Las Palmas Avenue in Patterson, California (APN: 021-070-002). The externally mounted HVAC unit of a premanufactured walk-in cabinet (WIC) and an emergency diesel standby generator have been identified as the primary noise sources associated with the project. The project site location with aerial imagery shown in Figure 1. The studied site drawings are dated December 1, 2022.

Bollard Acoustical Consultants, Inc. (BAC) has been contracted by Complete Wireless Consulting, Inc. to complete an environmental noise assessment regarding the proposed project cellular equipment operations. Specifically, the following assessment addresses daily noise production and exposure associated with operation of the project emergency generator and HVAC equipment.

Please refer to Appendix A for definitions of acoustical terminology used in this report. Appendix B illustrates common noise levels associated with various sources.

Criteria for Acceptable Noise Exposure
City of Patterson General Plan
The Health and Safety Element of the City of Patterson General Plan establishes performance standards for non-transportation (stationary) noise sources, such as those proposed by the project. The non-transportation noise level limits contained in the General Plan have been reproduced and are provided below in Table 1.

Table 1
Noise Level Performance Standards for New Projects Affected by or Including Non-Transportation Noise Sources1
Daytime Nighttime
Noise Level Descriptor (7:00 a.m. to 10:00 p.m.) (10:00 p.m. to 7:00 a.m.) Hourly Leq, dB 50 45
Maximum Level (Lmax), dB 70 65
1 Each of the noise level standards specified in Table 1 shall be reduced by five (5) dBA for pure tone noises, noise consisting primarily of speech or music, or for recurring impulsive noises. These noise level standards do not apply to residential units established in conjunction with industrial or commercial uses (e.g., caretaker units).

These standards are to be assessed at the property line of lands designated for noise-sensitive uses.

Source: City of Patterson General Plan, Health and Safety Element, Table HS-1 Project Noise Generation
As discussed previously, there are two project noise sources which are considered in this evaluation: the externally mounted HVAC unit of the pre-manufactured WIC and the emergency diesel generator. The evaluation of potential noise impacts associated with the operation of each noise source is evaluated separately as follows:

Environmental Noise Assessment
CVLOt 687 AT&T Cellular Facility- Patterson, California

Page 1 ends

Legend
D Proposed AT&T Cellular Equipment Lease Area
Parcel Boundaries (Approximate)
0 N
1'
Scale (Feet)
75 150
CVL01687 AT&T Cellular Facility
Patterson, California
Proposed Cellular Facility Lease Area
& Nearest Noise-Sensitive Use
Figure 1 tjB))
B~~4
Bollard Acoustical Consultants, Inc.

HVAC Equipment Noise Source and Reference Noise Level
The project proposes the installation of a pre-manufactured WIG equipped with one (1) externally mounted HVAC unit within the equipment lease area illustrated on Figure 1. According to the project site plan, the HVAC unit assumed for the project is a Marvair Airxcel, Inc. Model ECUA 18ACA. Based on reference noise level data obtained from the manufacturer (Marvair Airxcel, Inc.), this specific HVAC unit model has a reference noise level of 62 dB at a distance of 5 feet. The manufacturer's noise level data specification sheet for the proposed HVAC equipment is provided as Appendix C.

Generator Noise Source and Reference Noise Level
The project also proposes the installation of an emergency standby diesel generator within the lease area to maintain cellular service during emergency power outages. Specifically, the project proposes the installation of a Generac Industrial Power Systems Model SD030 equipped with a Level 2 Acoustic Enclosure. According to manufacturer documentation (provided as Appendix D), the SD030 with a Level 2 Acoustic Enclosure has a reference noise level of 68 dB at a distance of 23 feet.

The generator which is proposed at this site would only operate during emergencies (power outages) and brief daytime periods for periodic maintenance/lubrication. According to the project applicant, testing of the generator would occur twice per month, during daytime hours, for a duration of approximately 15 minutes. The emergency generator would not operate at night, except during power outages. It is expected that nighttime operation of the project emergency generator would be exempt from the city's exterior noise exposure criteria due to the need for continuous cellular service provided by the project equipment.

Predicted Facility Noise Levels at the Nearest Noise-Sensitive Use The nearest noise-sensitive uses have been identified as residential located west of the project parcel. Assuming standard spherical spreading loss (-6 dB per doubling of distance), project equipment noise exposure at the property line of the nearest residential use was calculated and the results of those calculations are presented in Table 2. Satisfaction of the city's noise criteria at the nearest noise-sensitive use would ensure for satisfaction of the criteria at noise-sensitive uses located farther away.

Table 2
Summary of Project-Related Noise Exposure at the Nearest Noise-Sensitive Use Distance from Predicted Equipment Noise Levels (dB)
APN1 Land Use Lease Area (ft)2 HVAC, Leq Generator, Lmax 021-040-055 Residential 180 31 50
1 Parcel boundaries are shown on Figure 1. 2 Distance was scaled using the provided site plans and City of Patterson Public Inquiry Map.

Source: BAC. 2022.

Because the proposed HVAC unit could potentially be in operation during nighttime hours, the operation of the HVAC unit would be subject to the General Plan nighttime noise level standard of 45 dB Leq (Table 1). As indicated in Table 2, the predicted HVAC equipment noise level of 31 Environmental Noise Assessment
CVL01687 AT&T Cellular Facility- Patterson, California
Page3
Bollard Acoustical Consultants, Inc.
dB Leq at the property line of the nearest noise-sensitive use (APN: 021-040-055, residential) would satisfy the General Plan 45 dB Leq nighttime noise level limit by a wide margin. As a result, no further consideration of HVAC equipment noise mitigation measures would be warranted for the project.

Because the project generator would only operate during daytime hours for brief periods required for testing and maintenance, and because generator noise is assumed to be exempt during emergency operations, noise from the generator would be subject to the General Plan daytime noise level standard of 70 dB Lmax. As shown in Table 2, the predicted generator noise level of 50 dB Lmax at the property line of the nearest noise-sensitive use (APN: 021-040-055, residential) would satisfy the General Plan 70 dB Lmax daytime noise level standard by a wide margin. As a result, no further consideration of emergency generator noise mitigation measures would be warranted for the project.

Conclusions
Based on the equipment noise level data and analyses presented above, project-related equipment noise exposure is expected to satisfy the applicable City of Patterson General Plan noise level criteria at the closest noise-sensitive uses. As a result, no further consideration of project equipment noise mitigation measures would be warranted for this project.

This concludes our environmental noise assessment for the proposed CVL01687 AT&T Cellular Facility in Patterson, California. Please contact BAC at (530) 537-2328 or [email protected] with any questions or requests for additional information.

Environmental Noise Assessment
CVL01687 AT&T Cellular Facility- Patterson, California
Page4
Appendix A
Acoustical Terminology
Acoustics The science of sound.

Ambient Noise The distinctive acoustical characteristics of a given space consisting of all noise sources audible at that location. In many cases, the term ambient is used to describe an existing or pre-project condition such as the setting in an environmental noise study.

Attenuation The reduction of an acoustic signal.

A-Weighting A frequency-response adjustment of a sound level meter that conditions the output signal to approximate human response.

Decibel or dB Fundamental unit of sound. A Bell is defined as the logarithm of the ratio of the sound pressure squared over the reference pressure squared. A Decibel is one-tenth of a Bell.

CNEL Community Noise Equivalent Level. Defined as the 24-hour average noise level with noise occurring during evening hours (7 - 10 p.m.) weighted by a factor of three and nighttime hours weighted by a factor of 10 prior to averaging.

Frequency The measure of the rapidity of alterations of a periodic signal, expressed in cycles per second or hertz.

IIC Impact Insulation Class (IIC): A single-number representation of a floor/ceiling partition's impact generated noise insulation performance. The field-measured version of this number is the FIIC.

Ldn Day/Night Average Sound Level. Similar to CNEL but with no evening weighting.

Leq Equivalent or energy-averaged sound level.

Lmax The highest root-mean-square (RMS) sound level measured over a given period of time.

Loudness A subjective term for the sensation of the magnitude of sound.

Masking The amount (or the process) by which the threshold of audibility is for one sound is raised by the presence of another (masking) sound.

Noise Unwanted sound.

Peak Noise The level corresponding to the highest (not RMS) sound pressure measured over a given period of time. This term is often confused with the "Maximum" level, which is the highest RMS level.

RT so The time it takes reverberant sound to decay by 60 dB once the source has been removed.

STC Sound Transmission Class (STC): A single-number representation of a partition's noise insulation performance. This number is based on laboratory-measured, 16-band (1/3- octave) transmission loss (TL) data of the subject partition. The field-measured version of this number is the FSTC.
~ \\\\ BOLLARD 1-'\J J J)) Acoustical Consultants
Appendix B
~
Typical A-Weighted Sound Levels of Common Noise Sources Decibel Scale (dBA)*
12-Gauge Shotgun 160
Chainsaw 110
Motorcycle 100
Lawn Mower 90
Vacuum Cleaner 80
Pin Falling 15
Jet Takeott 140
Pneumatic Riveter 124
Hammer Drill 114
Rock Concert 105
Tractor/Hand Drill 97
~
Cily i,affic 78
- - - -
fl.et1nr.Ji lrnn~~t" ~ I
·s.:vws
1/\W~ COC rp. ·r.1,;r;M~'J>O,'.,(a'~:C, r,e-,
n11p;:t-H=~..ll~crtl(n-al0',\!Q ma,,.ctrn
Appendix C
Distmce From
Unit (Feet)
5 10
20 30
40 50
60 70
80 Marvair 15ci Seelllng Dr111e
CCl'dele, Georgia 311115
229-273-07~
Sound Pressw-e LeYel for the lndU-strial Pioduct Air Conditioners (dBi\.) Model "umb-er
ECUA06ACA E(UAOSACA ECUAOUA(A ECt:AOlSACA

51.5 62

50.7 58

47.8 55

46.5 51

45.6 45.6
Notes: ( 1) Date: July 1,2019
(2) Bsckgroond SoiJlld Pressure Level: 41 d5A
(3) Sound Level Meter I Meter Above Gn,..md DiTealy in Line 'hith Outdo« Coil (4) All units -410A Refrigerant
Appendix D
GENERAC' j lI\11:JIJ~TRIAL
S0030
H ...,
w
HIE
H
~ ..
w
I!! E E
' ,, H ~ . ' ..
. 11 I
L
i El
H
did
c5
-
L w
~
0 MDEQ OPT
0 Florida DERM/DEP OPT
0 Chicago Fire Code OPT
0 IFC Certification CALL
0 ULC CALL
Other Custom Options Available from your
Generac Industrial Power Dealer
dimensions, weights and sound levels

OPEN SET

RUNTIME USABLE

HOURS CAPACITY
(GAL) L w H WT dBA'
NO TANK 76 38 46 2060
20 54 76 38 59 2540
48 132 76 38 71 2770 82
77 211 76 38 83 2979
109 300 93 38 87 3042

STANDARD ENCLOSURE

RUN TIME USABLE

HOURS CAPACITY
(GAL) L w H WT dBA"
NO TANK 95 38 50 2362
20 54 95 3B 63 2842
48 132 95 38 75 3072 77
77 211 95 38 87 3281
109 300 95 36 91 3344
LEVEL 1 ACOUSTIC ENCLOSURE

RUN TIME USABLE

HOURS CAPACITY
(GAL) L w H WT dBA'
NO TANK 11 3 38 50 2515
20 54 113 38 63 2995
48 132 11 3 38 75 3225 70
77 211 113 38 87 3434
109 300 11 3 38 91 3497
LEVEL 2 ACOUSTIC ENCLOSURE

RUN TIME USABLE
CAPACITY HOURS (GAL) L w H WT dBA'
NO TANK 95 38 62 2520
20 54 95 38 75 3000
48 132 95 36 67 3230 66
77 211 95 36 99 39
109 300 95 38 103 3502
• All measurements are approximate and lor estimalion purposes only Weights are without luel in tank Sound levels measured at 2311 (Im) and does 001 account lor ambienl sile cond itions.

YOUR FACTORY RECOGNIZED GENERAC INDUSTRIAL DEALER
Spec~ication characteristics may change without notice Dimensions and weights are for pr'tl1minary purposes Dtll:,o. Please consul! a Generac Power Systems Industrial Dealer lor detailed 1nstallabon drawings Generac Power Systems, Inc. • S45 W29290 HWY. 59, Waukesha, WI 53189 • generac.com Q2012 Genera, Power Systems, Inc All righls reseived. All specihc,tions are sut>ject 10 change WllhoU11101,ce Bulletin 0195010SBY-B / Pl'inted ill u SA 02/15112 Radio Frequency - Electromagnetic Energy
(RF-EME) Compliance Report
Site Number: CVL0 1687
RFDS ID: 5542661
Pace Number: MRSFR053894/MRSFR065826/MRSFR065873/
M RSFR065960/M RSFR065943/M RSFR089958/ M RSFR06584 I
Patterson
I 025 West Las Palmas Avenue
Patterson, California 95363
Stanislaus County .

37.46688056; -121.14255556 NAD83
Tower
The proposed AT&T installation will be in compliance with FCC regulations upon proper installation of recommended signage.

EBI Project No. 6223001457
April 19, 2023
Prepared for:

AT&T Mobility, LLC
c/o Complete Wireless Consulting Inc
2009 V Street
Sacramento, CA 95818
RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0l687
I 025 West Las Palmas Avenue, Patterson, California

TABLE OF CONTENTS
EXECUTIVE SUMMARY ..................................................................................................................... I

1.0 FEDERAL COMMUNICATIONS COMMISSION (FCC) REQUIREMENTS ................................... 3

2.0 AT&T RF EXPOSURE POLICY REQUIREMENTS .................................................................... 5

3.0 WORST-CASE PREDICTIVE MODELING ................................................................................. 5 4,0 RECOMMENDED SIGNAGE/COMPLIANCE PLAN .................................................................... 7

5.0 SUMMARY AND CONCLUSIONS ............................................................................................. 8

6.0 LIMITATIONS ......................................................................................................................... 8 Appendix A
Appendix B
Personnel Certifications
Compliance/Signage Plan

APPENDICES
EBI Consulting ♦ 21 B Street ♦ Burlington, MA 01803 ♦ 1.800.786.2346 RF-EME Compliance Report
EBI Project No. 6223001457

EXECUTIVE SUMMARY
Purpose of Report
USID No. 324890 Site No. CVL0 1687
1025 West Las Palmas Avenue, Patterson, California
EnviroBusiness Inc. (dba EBI Consulting) has been contracted by AT&T Mobility, LLC to conduct radio frequency electromagnetic (RF-EME) modeling for AT&T Site CVL0 1687 located at 1025 West Las Palmas Avenue in Patterson, California to determine RF-EME exposure levels from proposed AT&T wireless communications equipment at this site. As described in greater detail in Section 1.0 of this report, the Federal Communications Commission (FCC) has developed Maximum Permissible Exposure (MPE) Limits for general public exposures and occupational exposures. This report summarizes the results of RF-EME modeling in relation to relevant FCC RF-EME compliance standards for limiting human exposure to RF-EME fields.

This report contains the RF EME analysis for the site, including the following:
• Site Plan with antenna locations
• Graphical representation of theoretical MPE fields based on modeling • Graphical representation of recommended signage and/or barriers This document addresses the compliance of AT&T's transmitting facilities independently and in relation to all collocated facilities at the site.

Statement of Compliance
A site is considered out of compliance with FCC regulations if there are areas that exceed the FCC exposure limits and there are no RF hazard mitigation measures in place. Any carrier which has an installation that contributes more than 5% of the applicable MPE must participate in mitigating these RF hazards.

As presented in the sections below, based on worst-case predictive modeling, there are no modeled exposures on any accessible canopy and ground walking/working surface related to ATT's proposed antennas that exceed the FCC's occupational and/or general public exposure limits at this site.

Additionally, there are areas where elevated workers may be exposed to power densities greater than the occupational limits. The worst-case emitted power density may exceed the FCC's occupational limit within approximately 39 feet of AT&T's proposed antennas at the antenna face level. Workers and the general public should be informed about the presence and locations of antennas and their associated fields.

As such, the proposed AT&T installation is in compliance with FCC regulations upon proper installation of recommended signage and/or barriers.

AT&T Recommended Signage/Compliance Plan
AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, requires that:

I. All sites must be analyzed for RF exposure compliance;

2. All sites must have that analysis documented; and

3. All sites must have any necessary signage and barriers installed.

Site compliance recommendations have been developed based upon protocols presented in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, additional guidance provided by AT&T, EBl's understanding of FCC and OSHA requirements, and common EBI Consulting ♦ 21 B Street ♦ Burlington, MA 0 1803 ♦ 1.800.786.2346 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0l 687
1025 West Las Palmas Avenue, Patterson, California
industry practice. Barrier locations have been identified (when required) based on guidance presented in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014.

The following signage is recommended at this site:
• Yellow CAUTION 2B sign posted at the base of the tower near the climbing ladder.

The signage proposed for installation at this site complies with AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document and therefore complies with FCC and OSHA requirements. Barriers are not recommended on this site. To reduce the risk of exposure and/or injury, EBI recommends that access to the tower or areas associated with the active antenna installation be restricted and secured where possible. More detailed information concerning site compliance recommendations is presented in Section 4.0 and Appendix B of this report.

EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 2 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
1025 West Las Palmas Avenue, Patterson, California

1.0 FEDERAL COMMUNICATIONS COMMISSION (FCC) REQUIREMENTS The FCC has established Maximum Permissible Exposure (MPE) limits for human exposure to Radiofrequency Electromagnetic (RF-EME) energy fields, based on exposure limits recommended by the National Council on Radiation Protection and Measurements (NCRP) and, over a wide range of frequencies, the exposure limits developed by the Institute of Electrical and Electronics Engineers, Inc. (IEEE) and adopted by the American National Standards Institute (ANSI) to replace the 1982 ANSI guidelines. Limits for localized absorption are based on recommendations of both ANSI/IEEE and NCRP.

The FCC guidelines incorporate two separate tiers of exposure limits that are based upon occupational/controlled exposure limits {for workers) and general public/uncontrolled exposure limits for members of the general public.

Occupational/controlled exposure limits apply to situations in which persons are exposed as a consequence of their employment and in which those persons who are exposed have been made fully aware of the potential for exposure and can exercise control over their exposure. Occupational/ controlled exposure limits also apply where exposure is of a transient nature as a result of incidental passage through a location where exposure levels may be above general public/uncontrolled limits (see below), as long as the exposed person has been made fully aware of the potential for exposure and can exercise control over his or her exposure by leaving the area or by some other appropriate means.

General public/uncontrolled exposure limits apply to situations in which the general public may be exposed or in which persons who are exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure. Therefore, members of the general public would always be considered under this category when exposure is not employment-related, for example, in the case of a telecommunications tower that exposes persons in a nearby residential area.

Table I and Figure I (below), which are included within the FCC's OET Bulletin 65, summarize the MPE limits for RF emissions. These limits are designed to provide a substantial margin of safety. They vary by frequency to take into account the different types of equipment that may be in operation at a particular facility and are "time-averaged" limits to reflect different durations resulting from controlled and uncontrolled exposures.

The FCC's MPEs are measured in terms of power (mW) over a unit surface area (cm2). Known as the power density, the FCC has established an occupational MPE of 5 milliwatts per square centimeter (mW/cm2) and an uncontrolled MPE of I mW/cm2 for equipment operating in the 1900 MHz frequency range. For the AT&T equipment operating at 850 MHz, the FCC's occupational MPE is 2.83 mW/cm2 and an uncontrolled MPE of 0.57 mW/cm2. For the AT&T equipment operating at 700 MHz, the FCC's occupational MPE is 2.33 mW/cm2 and an uncontrolled MPE of 0.47 mW/cm2. These limits are considered protective of these populations.

Table I: Limits for Maximum Permissible Exposure (MPE)
(A) Limits for Occupational/Controlled Exposure
Frequency Range Electric Field Magnetic Field Power Density (S) Averaging Time (MHz) Strength (E) Strength (H) (mW/cm2
) [E]2, [H] 2
, or S
(Vim) (Alm) (minutes)

0.3-3.0 614 1.63 ( 100)* 6

3.0-30 1842/f 4.89/f (900/f)* 6
30-300 61.4 0.163 1.0 6
300-1,500 -- -- f/300 6
1,500-100,000 - -- 5 6
EBI Consulting ♦ 21 B Street ♦ Burlington, MA 0 1803 ♦ 1.800.786.2346 3 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
I 025 West Las Palmas Avenue, Patterson, California
(B) Limits for General PublidUncontrolled Exposure
Frequency Range Electric Field Magnetic Field Power Density (5) (MHz) Strength (E) Strength (H) (mW/cm2 ) (V/m) (Alm)

0.3-1.34 614 1.63 (100)*

1.34-30 824/f 2.19/f (180/f)*
30-300 27.5 0.073 0.2
300-1,500 -- - f/1 ,500

1.500-100,000 -- - 1.0
f = Frequency in (MHz)
* Plane-wave equivalent power density
Figure 1. FCC Limits for Maximum Permissible Exposure (MPE) Plane-wave Equivalent Power Density
100 N
E
0 ~
-S
~ 10
"iii
C: 5 Q)
0 ai
~ 1 0
a..

0.2 0. 1
\
\
- Occupational/Controlled Exposure
- - - - General Population/Uncontrolled Exposure
\ / ,_ - - - _.,. /
✓
/
,,- - - - - - - - - -
Averaging Time
[E] 2, [H] 2, or S
(minutes)
30 30
30 30
30 0.03 0.3 1 3 30

1.34 300 13,000
t,500
30,000 1300,000
100,000
Frequency (MHz)
Based on the above, the most restrictive thresholds for exposures of unlimited duration to RF energy for several personal wireless services are summarized below:

Personal Wireless Service Approximate Occupational Public MPE Frequency MPE Microwave (Point-to-Point) 5,000 - 80,000 MHz 5.00 mW/cm2 1.00 mW/cm2 Broadband Radio (BRS) 2,600 MHz 5.00 mW/cm2 1.00 mW/cm2 Wireless Communication (WCS) 2,300 MHz 5.00 mW/cm2 1.00 mW/cm2 Advanced Wireless (AWS) 2, 100 MHz 5.00 mW/cm2 1.00 mW/cm2 Personal Communication (PCS) 1,950 MHz 5.00 mW/cm2 1.00 mW/cm2 Cellular Telephone 870 MHz 2.90 mW/cm2 0.58 mW/cm2
Specialized Mobile Radio (SMR) 855 MHz 2.85 mW/cm2 0.57 mW/cm2 Lonj!'. Term Evolution (L TE) 700 MHz 2.33 mW/cm2 0.47 mW/cm2 Most Restrictive Frequency Ranj!'.e 30-300 MHz 1.00 mW/cm2 0.20 mW/cm2 MPE limits are designed to provide a substantial margin of safety. These limits apply for continuous exposures and are intended to provide a prudent margin of safety for all persons, regardless of age, gender, size, or health.

EBI Consulting ♦ 21 B Street ♦ Burlington, MA 0 1803 ♦ 1.800.786.2346 4 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
1025 West Las Palmas Avenue, Patterson, California
Personal Communication (PCS) facilities used by AT&T in this area operate within a frequency range of 700-1900 MHz. Facilities typically consist of: I) electronic transceivers (the radios or cabinets) connected to wired telephone lines; and 2) antennas that send the wireless signals created by the transceivers to be received by individual subscriber units (PCS telephones). Transceivers are typically connected to antennas by coaxial cables.

Because of the short wavelength of PCS services, the antennas require line-of-site paths for good propagation, and are typically installed above ground level. Antennas are constructed to concentrate energy towards the horizon, with as little energy as possible scattered towards the ground or the sky.

This design, combined with the low power of PCS facilities, generally results in no possibility for exposure to approach Maximum Permissible Exposure (MPE) levels, with the exception of areas directly in front of the antennas.

2.0 AT&T RF EXPOSURE POLICY REQUIREMENTS
AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, requires that:

I. All sites must be analyzed for RF exposure compliance;

2. All sites must have that analysis documented; and

3. All sites must have any necessary signage and barriers installed.

Pursuant to this guidance, worst-case predictive modeling was performed for the site. This modeling is described below in Section 3.0. Lastly, based on the modeling and survey data, EBI has produced a Compliance Plan for this site that outlines the recommended signage and barriers. The recommended Compliance Plan for this site is described in Section 4.0.

3.0 WORST-CASE PREDICTIVE MODELING
In accordance with AT&T's RF Exposure policy, EBI performed theoretical modeling using RoofMaster™ software to estimate the worst-case power density at the site canopy and ground-level and/or nearby rooftops resulting from operation of the antennas. RoofMaster TM is a widely-used predictive modeling program that has been developed to predict RF power density values for rooftop and tower telecommunications sites produced by vertical collinear antennas that are typically used in the cellular, PCS, paging and other communications services. Using the computational methods set forth in Federal Communications (FCC) Office of Engineering & Technology (OET) Bulletin 65, "Evaluating Compliance with FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields" (OET-65), RoofMaster TM calculates predicted power density in a scalable grid based on the contributions of all RF sources characterized in the study scenario. At each grid location, the cumulative power density is expressed as a percentage of the FCC limits. Manufacturer antenna pattern data is utilized in these calculations. RoofMaster™ models consist of the Far Field model as specified in OET-65 and an implementation of the OET-65 Cylindrical Model (Sula9). The models utilize several operational specifications for different types of antennas to produce a plot of spatially-averaged power densities that can be expressed as a percentage of the applicable exposure limit. A statistical power factor may be applied to the antenna system based on guidance from the carrier and system manufacturers.

For this report, EBI utilized antenna and power data provided by AT&T and compared the resultant worst-case MPE levels to the FCC's occupational/controlled exposure limits outlined in OET Bulletin 65.

The assumptions used in the modeling are based upon information provided by AT&T and information gathered from other sources. There are no other wireless carriers with equipment installed at this site.

Based on worst-case predictive modeling, there are no modeled exposures on any accessible canopy and ground walking/working surface related to ATT's proposed antennas that exceed the FCC's EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 5 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0l687
1025 West Las Palmas Avenue, Patterson, California
occupational and/or general public exposure limits at this site. Additionally, there are areas where elevated workers may be exposed to power densities greater than the occupational limits. The worstcase emitted power density may exceed the FCC's occupational limit within approximately 39 feet of AT&T's proposed antennas at the antenna face level. Workers and the general public should be informed about the presence and locations of antennas and their associated fields.

At the nearest walking/working surfaces to the AT&T antennas on the canopy, the maximum power density generated by the AT&T antennas is approximately 15.03 percent of the FCC's general public limit (3.0 I percent of the FCC's occupational limit). The composite exposure level from all carriers on this site is approximately 15.03 percent of the FCC's general public limit (3.0 I percent of the FCC's occupational limit) at the nearest walking/working surface to each antenna. Based on worst-case predictive modeling, there are no areas at ground/street level related to the proposed AT&T antennas that exceed the FCC's occupational or general public exposure limits at this site. At ground/street level, the maximum power density generated by the antennas is approximately 8.05 percent of the FCC's general public limit ( 1.61 percent of the FCC's occupational limit).

A graphical representation of the RoofMaster ™ modeling results is presented in Appendix B.

Microwave dish antennas are designed for point-to-point operations at the elevations of the installed equipment rather than ground-level coverage. Based on AT& T's RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, microwave antennas are considered compliant if they are higher than 20 feet above any accessible walking/working surface. All microwaves on site are considered compliant with AT&T's guidance and were not included in the modeling analysis.

EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 6 RF-EME Compliance Report
EBI Project No. 6223001457

4.0 RECOMMENDED SIGNAGE/COMPLIANCE PLAN
USID No. 324890 Site No. CVL0 1687
I 025 West Las Palmas Avenue, Patterson, California
Signs are the primary means for control of access to areas where RF exposure levels may potentially exceed the MPE. As presented in the AT&T guidance document, the signs must:
• Be posted at a conspicuous point;
■ Be posted at the appropriate locations;
• Be readily visible; and
• Make the reader aware of the potential risks prior to entering the affected area.

The table below presents the signs that may be used for AT&T installations.

CRAN/ HETNET Small Cell Decals/ Signs Alerting Signs
NOTICE (Cf>)
RF energy emitted by lhl• antenna m•y uceed lhe FCC"• npMure limits fot the general population.

Sby al leasl 1 feel away from the antenna.

Call AT&T al 800-638-2822. option 9 lhen 3, lor help of you need acctss within ftet. nOM,oou- kDl9't
NOTICE Cy) AT&T operaln 1n1onn.11 at 1h11, structur•
thb; po,nt you are entonng 1n
,,.,. where radio fr~uency tRFJ ~kf•
may HC'Nd 1h• FCC Gen•r•I Population
Up(KUfe limits
Follow safety guldehnn for ~Ing jn an
RF environment
KNp ft away from the front& ol the
antonn,11 .•
Contact AT&T at 800-6l8·2822, opt 9. 3
ornd foll.ow their ln5ll'\lc0ons pnor to
porforml11g any mJinlonanco or r•~i"
:,bove lht'S polnl
This 11 AT&T Sile USIO __ _
RF onorgy omlttod by lhlunlonna m~y n<ff<llho FCC's
occupallonal exposu,e limits.

Slay at leasl 1 leel away lrom lhe antenna.

Call AT&T al 800-638-2822. option 9 lhen J, lor help II you need access within 1 foel. ur• ,u..1u ..,m:i
A CAUTION &, AT&T operaln 1ntonnn 1t lh.S 1lru~lure,
lh~ point you Art entitring 1n
Utui wh.,. radio froqu.ncy tRF') rlelds
m..y oxcHd lhe FCC OccupaUon.al
uposure limtts.
fol'°1iw ufaty ;uhklinn to, .....otklng in 1n
RF 1,wlr011ment
KNp fl awAy from the fronts of~
Antitnnas.

ContACI AT&T .11800-638-2822. opt 9. l
1nd lollow thei, Instructions prior IO
porlonnlr.g 1n1 malnlenar,c• or rtp.alra
abaw• this ~nl Coll Sito USIO __ _
NOTICE
DECAL
NOTICE
SIGN

CAUTION
DECAL

CAUTION
SIGN
m -=~- ----

TRILINGUAL
NOTICE
0 .A.CAUTION°
M i'U•.-0--.11•••
!:'!:t::;-=:.;~11! fl!~(~ .....
...... ,_""'"',_,_ ... ~·-· c-,a lo11:d-UlllU,,_,.._, _. I ,ftJIIAla~-----·,..._. __,.,.,.......,., .. ,_ CAUTION 2-

ROOFTOP
0 .A.CAUTION.

M ~..,._,..,..,. ___ artu,
-,,--,a,f«Clit.-.,~I
t,..dC-11-----llb.-fMI M
....
....... .. , .
.......
. ..,....~- " .. ~ ..... ..__.....,.._.,_...,_,.,....,.. ----::a•N--ll!lt"l...-11 •---_a •--- 11:--•••r. __ __...... __ CAUTION 2BTOWER
~1,1.c:p11Mae-•.,..·· ,.,..,,..,,.,_.. .. ~il"-
.._r»,"""')l. 1"4t\...,r,, H:CC<~l~:,w.
f,i.,, .. W,-1,;i«1'1't"'~b..-..... 11••~-talf-Qn..--.....-. t,t,,.11:,1,1:-u.sa.:1:t.,r.ntft)
.::.,...i:.,.t1.1ta:ru1t~ _.. .. _ .....

WARNING 1B
EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 NOTICE
.,__,,,,,,,, '7ll ... ~---•11111• ,... _____ ,. __ ...,. • .,...t-111~ --,..... ..,,a:"'9u~W.-Ui!!b , ... W11rr,-...n111 .. ..,.. .....
-
O-.J&:&1••w!ffl~-..,.,,. •• ---.-....~_......,,, ~·~~n...-.

NOTICE 2

A CAUTION
A .&JlillPfll~C!flllt\.rtftr.Wf
qB,Sll#pff .... JQ,JL'THlnlt>i'h/nl
Mm1.1t.cl~fl'k'J!Pll~-,f:fffHlllf
K(Duur,.ihct11il,:p,wtlllnt\.
lotb,i,w.'rtJ~rlmnlcrntill;l
_, 11n.r
(l"l\1rtAJ,1111«'1H11&2l,c,:to,119~1
................ ,.,.... ~~r,;" o, """n.,dwi 111t i:,lf"'C n, CAUTION 2A 0
.A. CAUTION.

M ,,,,..,, .. ,_,.._~-~ - --~M.,._,,~ _.. t«~llu~Lllla. , ... U'IMI ........ ~----· -
~.&!ilflQ,lllJJJl.~•wt ---~
~.,...,, ... ~ ... ... tM -~ ...
. ---------=--·
CAUTION 2CPARAPETS
~/ )~\' :· '-: , /1:'~
~u:.._t1., _:..d:•
»,! ..... - ....... .,.,...., ... ,-:..,-,.,,,..,. ..... ~~ra::•...,,-..:-w •a~r~1,-. . .. ,,~ ... ~.-~-~ .. ... ~c-.1"""""_ .. ,.., C..,;1&·.i111)QU.:tll.1D1:0al .. l r,bkwr-w..,_,,....~ .. prt,,-i ~,:, ..... .,-.!!',~ .. , --- ---- WARNING 2A
7 RF-EME Compliance Report
EBI Project No. 622300 I ~57
USID No. 324890 Site No. CVL0 1687
I 025 West Las Pal mas Avenue, Patterson, California
Based upon protocols presented in AT&Ts RF Exposure: Responsibilities, Procedures & Guidelines document, dated October 28, 2014, and additional guidance provided by AT&T, the following signage is recommended on the site:
• Yellow CAUTION 2B sign posted at the base of the tower near the climbing ladder.

No barriers are required for this site. Barriers should be constructed of weather-resistant plastic or wood fencing. Barriers may consist of railing, rope, chain, or weather-resistant plastic if no other types are permitted or are feasible. Painted stripes should only be used as a last resort and only in regions where there is little chance of snowfall. If painted stripes are selected as barriers, it is recommended that the stripes and signage be illuminated. The signage and any barriers are graphically represented in the Signage Plan presented in Appendix B.

5.0 SUMMARY AND CONCLUSIONS
EBI has prepared this Radiofrequency Emissions Compliance Report for the proposed AT&T telecommunications equipment at the site located at I 025 West Las Palmas Avenue in Patterson, California.

EBI has conducted theoretical modeling to estimate the worst-case power density from AT&T antennas to document potential MPE levels at this location and ensure that site control measures are adequate to meet FCC and OSHA requirements, as well as AT&Ts corporate RF safety policies. As presented in the preceding sections, based on worst-case predictive modeling, there are no modeled exposures on any accessible canopy and ground walking/working surface related to ATT's proposed antennas that exceed the FCC's occupational and/or general public exposure limits at this site. Additionally, there are areas where elevated workers may be exposed to power densities greater than the occupational limits. The worst-case emitted power density may exceed the FCC's occupational limit within approximately 39 feet of AT&T's proposed antennas at the antenna face level. Workers and the general public should be informed about the presence and locations of antennas and their associated fields.

To reduce the risk of exposure and/or injury, EBI recommends that access to the tower or areas associated with the active antenna installation be restricted and secured where possible. Signage is recommended at the site as presented in Section 4.0 and Appendix B. Posting of the signage brings the site into compliance with FCC rules and regulations and AT&T's corporate RF safety policies.

All workers and individuals accessing the tower or persons (including arborists), accessing elevated structures or trees within areas exceeding the general public MPE, must be made aware of the presence and locations of antennas and t heir associated fields, where applicable.

6.0 LIMITATIONS
This report was prepared for the use of AT&T Mobility, LLC to meet requirements outlined in AT&Ts corporate RF safety guidelines. It was performed in accordance with generally accepted practices of other consultants undertaking similar studies at the same time and in the same locale under like circumstances. The conclusions provided by EBI and its partners are based solely on information supplied by AT&T, including modeling instructions, inputs, parameters and methods. Calculations, data, and modeling methodologies for C Band equipment include a statistical factor reducing the power to 32% of maximum theoretical power to account for spatial distribution of users, network utilization, time division duplexing, and scheduling time. AT&T recommends the use of this factor based on a combination of guidance from its antenna system manufacturers, .supporting international industry standards, industry publications, and its extensive experience. The observations in this report are valid on the date of the investigation. Any additional information that becomes available concerning the site EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 • 1.800.786.2346 8 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVLOl687
I 025 West Las Pal mas Avenue, Patterson, California
should be provided to EBI so that our conclusions may be revised and modified, if necessary. This report has been prepared in accordance with Standard Conditions for Engagement and authorized proposal, both of which are integral parts of this report. No other warranty, expressed or implied, is made.

EBI Consulting ♦ 21 B Street ♦ Burlington, MA O 1803 ♦ 1.800.786.2346 9 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0l687
I 025 West Las Palmas Avenue, Patterson, California
Appendix A
Personnel Certifications
EBI Consulting ♦ 21 B Street ♦ Burlington, MA 0 1803 ♦ 1.800.786.2346 10 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
1025 West Las Palmas Avenue, Patterson, California
Preparer Certification
I, Ian Swanson, state that:
•
•
•
•
•
I am an employee of EnviroBusiness Inc. (d/b/a EBI Consulting), which provides RF-EME safety and compliance services to the wireless communications industry.

I have successfully completed RF-EME safety training, and I am aware of the potential hazards from RF-EME and would be classified "occupational" under the FCC regulations.

I am fully aware of and familiar with the Rules and Regulations of both the Federal Communications Commissions (FCC) and the Occupational Safety and Health Administration (OSHA) with regard to Human Exposure to Radio Frequency Radiation.

I have been trained in on the procedures outlined in AT&T's RF Exposure: Responsibilities, Procedures & Guidelines document (dated October 28, 2014) and on RF-EME modeling using RoofMaster ™ modeling software.

I have reviewed the data provided by the client and incorporated it into this Site Compliance Report such that the information contained in this report is true and accurate to the best of my knowledge.

EBI Consulting • 21 B Street • Burlington, MAO 1803 ♦ 1.800.786.2346 11 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
I 025 West Las Pal mas Avenue, Patterson, California
Reviewed and Approved by:
sealed 19apr2023
Michael McGuire
Electrical Engineer
[email protected]
Note that EBl's scope of work is limited to an evaluation of the Radio Frequency - Electromagnetic Energy (RF-EME) field generated by the antennas and broadcast equipment noted in this report. The engineering and design of the building and related structures, as well as the impact of the antennas and broadcast equipment on the structural integrity of the building, are specifically excluded from EBl's scope of work.

EBI Consult ng ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 12 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
I 025 West Las Palmas Avenue, Patterson, California
Appendix B
Compliance/Signage Plan
EBI Consulting ♦ 21 B Street ♦ Burlington, MAO 1803 ♦ 1.800.786.2346 13 RF-EME Compliance Report
EBI Project No. 6223001457
USID No. 324890 Site No. CVL0 1687
I 025 West Las Palmas Avenue, Patterson, California
Nearest Walking Surface Simulation
D
fl 'IU"P••Ptll•-
1 : I .,.. ........ . ,---,
'- --'
Proposed CAUTION
2B Sign at the Base of
the tower
Existing Sign
Proposed Sign
Installed Sign
SECTOR 8
GROUND= O'
GROUND= O'
C!IZD
,.~
..
--• ... ,··:·. :~;:
~ -;..-.:.~::=. ~-~--- --- c~,- -·s
· ..- - '?' , ... ¥;
Percent M PE Legehd
□ 0% -100%
• 100% · 500%
□ 500% · 5000%
• 5000% +
Generol Populallon Limb
Sula 09
F arField Overlay
Reflection f1 , 61
10 foot grid size
[Avg: 20 to 26 Feet)
Carrier Color Code
ATT
IT]

SIGN IDENTIFICATION LEGEND
AT&T NOTICE 2 Sign ·-.4. AT&T CAUTION 2 - Rooftop Sign 2= AT&TWARNING IBand2ASigns -a,-~ -" AT&T CAUTION 2B-TowerSign AT&T NOTICE Small Cell Signs ·-..Q-. AT&T CAUTION 2C - Parapet Sign AT&T CAUTION Small Cell Signs ~ AT&T TRILINGUAL NOTICE Sign ~ EBI Consulting ♦ 21 B Street ♦ Burlington, MA O 1803 ♦ 1.800.786.2346 14

Disclaimer
"AT&T PROPRIETARY -- This information constitutes confidential trade secrets and commercial or financial information owned by AT&T and is shared for Critical Infrastructure Protection purposes only. It is exempt from disclosure under the Freedom of Information Act (5 U.S.C. 552), Exemptions (b)(3)&(4), and its disclosure is prohibited under the Trade Secrets Act (18 U.5.C. 1905), the Critical Infrastructure Information Act of 2002, 6 U.S.C. § 133, and any State or local law requiring disclosure of information or records. This information must not be copied or distributed to others not agreed upon by AT&T, but in all events do not copy or distribute to such others without notification pursuant to Executive Order 12600." Prr.ii111<>li:1 IY ~nd c,111fkl1-11t:il l Bt15.1i1•·~s ltr\il'IJlcrtl<ln 0f ATaT ,' - ·
·- at&t '· ,.
isting ,_
L TE 700 Cover
~
I Reliable Service Indoors/Outdoors
Reliable Coverage in Transit
Indoor Coverage Less Reliable
I Reliable Coverage Outdoors Only
Indoor Coverage Less Reliable
e Existing site
e Proposed site
Proprietary and Confidential Business lnfom1ation of AT&T ~~11~ ,
-~~\Jw ,--~.
:'wlL: .... . . if ~ · ... .;-...=., - ~ -
~ I ' ~,/·r!~ - . - '- l :~, ~ --~ ,'--· • I «:;--""t"•' ~.. . ~ ..• • c ~~ - ~~t ~(••- J. - . ,1\\. -
- ;.,::;.,.; . ').. " ¾~ . t ~\~~~~
~ . . \\ ~ .".".,,, 1. , ~... .? •• -<"I: I 'I!
-- itllll
,i - _I,
r.;~ . ~
, wr
0 ~
1 ~ .,yr t . .

5.- -~1
J~!
-:- "' I ., .,.,. ..II.
~, , I~
miles
. :-
, ;e. • ~ - .. '·--=---··at~t
Proposed L TE 700 Coverage - 1025 West Las Palmas Avenue @ RC = 74 ft r _:L. ~ .. ~. E•- ~\ ~J. ~ I .... ::ill., ~... .,,•. '\ , .. ~ •~

11.L ···~,, . .. • • ..,, . I\\,~ . : ..... · ·• • :ci~~ . ,'-: <.•;:,·,··' • .,, ' . -· --._, ~. ·r ~\·. ;, .·., l·.',,-!::, ·1 ~-:1;:;e'i ~I c~· .. ,~ .. _, ~ 1·: ,;'_ ~ ,.. .. """\ ,., '- :: ;: • ,. c,1,1•,,, ,. ., Ii·#~~\
:: ~ . ;.: ' (,,;J" ::,,-, ,._ , •. -:. i <• •••••n,i," .~ ·. ~~-.I.:. 11,·::_!, ',, 1 '· I ._ I . 1 ::!"'I - _ _ .-_.• .. ., .1 ·1 - l ·-~ .... -- 1 .r. "Ii r ,.. ---' ,~ . - ~ -~ ~~
= ==:}/ l I C I .~~: ~ - ~ ,) ,~,ll;.'!./i7 j ,,p_., ·,, :', '? ]• ...... ,:,.. ----.~ - 1', ·, 11:':•,"')l f~J ''f,:•/', r ,~ .. ~1 \ .., 0'' ,P I
--·-· ' I- ,
f,·-1~· .: •·b •1-.. ;~ .. ··
Legend
I Reliable Service Indoors/Outdoors
Reliable Coverage in Transit
Indoor Coverage Less Reliable
I Reliable Coverage Outdoors Only
Indoor Coverage Less Reliable
e Existing site
e Proposed site
,- ,J
/;.,,,,,, •'11 C
~
'1_ I_ Jt, 1-. .,.. ·~
_J r ....r ,-: ..... :~ --
- . .
r . 1-;:;-=---. ~ "" .:. : . :: ,, ;, ·,· ........... - --- Proprietary and Confidential Business Information of AT&T ·-i~ ~ ..... ~~, , :.,mm,I.~ ~ ~ L,~, I L
~.
~ -i:.~.~- .... ' ~-( ._, • -t'-.,: _ IIQ:llf
·--:;_ ~-~, .
~ #'J ~ -j
~ ~ -~"'T•. , , ~-:--, I ~
~~ i -; ~ ~(~' ··~ -j.. ~ . -~J.~
1 -- I ,,:, * .~
\\ "' ' Ill . ,,. ~ .,ai_ ~· ·~ ·'.
·'
... (I -. - - - - -
•· -'; I -,
\
' i . I, -~- .\ ..,
• H I,' I.' II ~.·,] •· ': •._r_· ~. I I
• 1 • ~,l . ,-". J 111111 • r ~ , ri ,1 ,., .. ,. • 1
11 LJ -
1 ~ , ,r / '.c;. 1 '-·4.
- :. = - ri .~- n ~ ..
:
. "L,, _ c:, -. I ~ .:~ ..: .,•,:r•r· i, , :. ; _ ~~ u
7 "II ~ ~
,. h. 111 ] - ~-
~ D.5
miles
;-: __ .... _ -
;• l ,_ :at&t ,..,__..- ·
,,>

GAVIN NEWSOM
GOVfHNOH
t;ALIFOANIA ......... YANA GARCIA
~~ St'GAFTARY fOA Water Boards .,...., ENVIRONMENTAL rAOTECTION Central Valley Regional Water Quality Control Board
31 July 2023
Joel Andrews
City of Patterson
1 Plaza
Patterson, CA 95363
[email protected]. us

COMMENTS TO REQUEST FOR REVIEW FOR THE NEGATIVE DECLARATION, AT&T WIRELESS TOWER -COMMUNITY CENTER PROJECT, SCH#2023060742,

STANISLAUS COUNTY
Pursuant to the State Clearinghouse's 28 June 2023 request, the Central Valley Regional Water Quality Control Board (Central Valley Water Board) has reviewed the Request for Review for the Negative Declaration for the AT&T Wireless Tower - Community Center Project, located in Stanislaus County.

Our agency is delegated with the responsibility of protecting the quality of surface and groundwaters of the state; therefore, our comments will address concerns surrounding those issues.

I. Regulatory Setting
Basin Plan
The Central Valley Water Board is required to formulate and adopt Basin Plans for all areas within the Central Valley region under Section 13240 of the Porter-Cologne Water Quality Control Act. Each Basin Plan must contain water quality objectives to ensure the reasonable protection of beneficial uses, as well as a program of implementation for achieving water quality objectives with the Basin Plans. Federal regulations require each state to adopt water quality standards to protect the public health or welfare, enhance the quality of water and serve the purposes of the Clean Water Act. In California, the beneficial uses, water quality objectives, and the Antidegradation Policy are the State's water quality standards. Water quality standards are also contained in the National Toxics Rule, 40 CFR Section 131.36, and the California Toxics Rule, 40 CFR Section 131.38.

The Basin Plan is subject to modification as necessary, considering applicable laws, policies, technologies, water quality conditions and priorities. The original Basin Plans were adopted in 1975, and have been updated and revised periodically as required, using Basin Plan amendments. Once the Central Valley Water Board has adopted a Basin Plan amendment in noticed public hearings, it must be approved by the State Water Resources Control Board (State Water Board), Office of MARK BRADFORD, CHAIR I PATRICK PuLUPA, Esa., EXECUTIVE OFFICER 11020 Sun Center Drive #200, Rene ho Cordova, CA 95670 I www.waterboards.ca.gov/centralvalley AT&T Wireless Tower -
Community Center Project
Stanislaus County
- 2 - 31 July 2023
Administrative Law (OAL) and in some cases, the United States Environmental Protection Agency (USEPA). Basin Plan amendments only become effective after they have been approved by the OAL and in some cases, the USEPA. Every three (3) years, a review of the Basin Plan is completed that assesses the appropriateness of existing standards and evaluates and prioritizes Basin Planning issues. For more information on the Water Quality Control Plan for the Sacramento and San Joaquin River Basins, please visit our website:
http://www.waterboards.ca.gov/centralvalley/water issues/basin plans/ Antidegradation Considerations
All wastewater discharges must comply with the Antidegradation Policy (State Water Board Resolution 68-16) and the Antidegradation Implementation Policy contained in the Basin Plan. The Antidegradation Implementation Policy is available on page 74 at:
https://www. waterboa rds. ca. gov /centralva lley/wate r issues/basin pla ns/sacsj r 2018

05.pdf
In part it states:

Any discharge of waste to high quality waters must apply best practicable treatment or control not only to prevent a condition of pollution or nuisance from occurring, but also to maintain the highest water quality possible consistent with the maximum benefit to the people of the State.

This information must be presented as an analysis of the impacts and potential impacts of the discharge on water quality, as measured by background concentrations and applicable water quality objectives.

The antidegradation analysis is a mandatory element in the National Pollutant Discharge Elimination System and land discharge Waste Discharge Requirements (WDRs) permitting processes. The environmental review document should evaluate potential impacts to both surface and groundwater quality.

II. Permitting Requirements
Clean Water Act Section 404 Permit
If the project will involve the discharge of dredged or fill material in navigable waters or wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the United States Army Corps of Engineers (USAGE). If a Section 404 permit is required by the USAGE, the Central Valley Water Board will review the permit application to ensure that discharge will not violate water quality standards. If the project requires surface water drainage realignment, the applicant is advised to contact the Department of Fish and Game for information on Streambed Alteration Permit requirements. If you have any questions regarding the Clean Water Act Section 404 permits, please contact the Regulatory Division of the Sacramento District of USAGE at (916) 557-5250.

Clean Water Act Section 401 Permit-Water Quality Certification If an USAGE permit (e.g., Non-Reporting Nationwide Permit, Nationwide Permit, Letter of Permission, Individual Permit, Regional General Permit, Programmatic AT&T Wireless TowerCommunity Center Project
Stanislaus County
- 3 - 31 July 2023
General Permit), or any other federal permit (e.g., Section 10 of the Rivers and Harbors Act or Section 9 from the United States Coast Guard), is required for this project due to the disturbance of waters of the United States (such as streams and wetlands), then a Water Quality Certification must be obtained from the Central Valley Water Board prior to initiation of project activities. There are no waivers for 401 Water Quality Certifications. For more information on the Water Quality Certification, visit the Central Valley Water Board website at:
https://www.waterboards.ca.gov/centralvalley/water issues/water quality certificatio n/
Waste Discharge Requirements - Discharges to Waters of the State If USACE determines that only non-jurisdictional waters of the State (i.e., "nonfederal" waters of the State) are present in the proposed project area, the proposed project may require a Waste Discharge Requirement (WDR) permit to be issued by Central Valley Water Board. Under the California Porter-Cologne Water Quality Control Act, discharges to all waters of the State, including all wetlands and other waters of the State including, but not limited to, isolated wetlands, are subject to State regulation. For more information on the Waste Discharges to Surface Water NPDES Program and WDR processes, visit the Central Valley Water Board website at:https://www.waterboards.ca.gov/centralvalley/water issues/waste to surface wat er/
Projects involving excavation or fill activities impacting less than 0.2 acre or 400 linear feet of non-jurisdictional waters of the state and projects involving dredging activities impacting less than 50 cubic yards of non-jurisdictional waters of the state may be eligible for coverage under the State Water Resources Control Board Water Quality Order No. 2004-0004-DWQ (General Order 2004-0004). For more information on the General Order 2004-0004, visit the State Water Resources Control Board website at:
https://www.waterboards.ca.gov/board decisions/adopted orders/water guality/200 4/wgo/wqo2004-0004. pdf
Dewatering Permit
If the proposed project includes construction or groundwater dewatering to be discharged to land, the proponent may apply for coverage under State Water Board General Water Quality Order (Low Threat General Order) 2003-0003 or the Central Valley Water Board's Waiver of Report of Waste Discharge and Waste Discharge Requirements (Low Threat Waiver) RS-2018-0085. Small temporary construction dewatering projects are projects that discharge groundwater to land from excavation activities or dewatering of underground utility vaults. Dischargers seeking coverage under the General Order or Waiver must file a Notice of Intent with the Central Valley Water Board prior to beginning discharge.

For more information regarding the Low Threat General Order and the application process, visit the Central Valley Water Board website at:
http://www. waterboards. ca. gov/board decisions/adopted orders/water qua lity/2003/ wqo/wqo2003-0003. pdf
AT&T Wireless TowerCommunity Center Project
Stanislaus County
-4- 31 July 2023
For more information regarding the Low Threat Waiver and the application process, visit the Central Valley Water Board website at:
https://www.waterboards.ca.gov/centralvalley/board decisions/adopted orders/waiv ers/r5-2018-0085. pdf
Limited Threat General NPDES Permit
If the proposed project includes construction dewatering and it is necessary to discharge the groundwater to waters of the United States, the proposed project will require coverage under a National Pollutant Discharge Elimination System (NPDES) permit. Dewatering discharges are typically considered a low or limited threat to water quality and may be covered under the General Order for Limited Threat Discharges to Surface Water (Limited Threat General Order). A complete Notice of Intent must be submitted to the Central Valley Water Board to obtain coverage under the Limited Threat General Order. For more information regarding the Limited Threat General Order and the application process, visit the Central Valley Water Board website at:
https://www. wate rboa rd s. ca. gov /central valley/boa rd decisions/ad opted orders/gene ral orders/rS-2016-0076-01.pdf
NPDES Permit
If the proposed project discharges waste that could affect the quality of surface waters of the State, other than into a community sewer system, the proposed project will require coverage under a National Pollutant Discharge Elimination System (NPDES) permit. A complete Report of Waste Discharge must be submitted with the Central Valley Water Board to obtain a NPDES Permit. For more information regarding the NPDES Permit and the application process, visit the Central Valley Water Board website at: https://www.waterboards.ca.gov/centralvalley/help/permit/ If you have questions regarding these comments, please contact me at (916) 464-4684 or [email protected].
/Jlltu~
Peter Minkel
Engineering Geologist
cc: State Clearinghouse unit, Governor's Office of Planning and Research, Sacramento

PUBLIC NOTICE

THE CITY OF PATTERSON PLANNING COMMISSION

REGULAR MEETING
NOTICE IS HEREBY GIVEN that the City of Patterson (“City”) Planning Commission will hold a Regular Meeting on Thursday, September 14, 2023, at 7:00 p.m., in person AND via video conferencing and Zoom teleconference, to consider the following:

Public Hearing: AT&T Wireless Tower – Conditional Use Permit #23-01, Community Center, Negative Declaration #23-01, APN#021-070-002
Consideration of a Conditional use permit for an unmanned wireless tower facility (cell tower) located on the north side of West Las Palmas Avenue, approximately 125 feet east of the intersection with Kestrel Drive and to consider adopting a negative declaration for the construction and operation of an unmanned wireless facility, consisting of an 84.9’ tall decorative bell tower, an 8’x8’ pre-cast concrete shelter, and a 30 KW generator, enclosed by a solid wall. The project site is located in the Public/Quasi-Public zone.

NOTICE: THIS MEETING WILL BE PHYSICALLY OPEN TO THE PUBLIC. ALL MEMBERS OF THE PUBLIC

MAY ALSO PARTICIPATE IN THE MEETING VIA VIDEO CONFERENCING AND ZOOM TELECONFERENCE BY CALLING 1-669-900-6833, MEETING ID: 701-906-1477, PASSWORD: 20995363 AND WILL BE GIVEN THE OPPORTUNITY TO PROVIDE PUBLIC COMMENT. JOIN FROM A PC, MAC, IPAD, IPHONE, OR ANDROID DEVICE BY USING THIS URL:
https://us06web.zoom.us/j/7019061477?pwd=VEIrMTlYdmNZTk53ZitzZUdSZUQxZz09 In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the Planning Department at (209) 895-8020. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. [28 CFR 35.102-

35.104 ADA Title II]. The Planning Commission agenda and supporting public documents are available for viewing in City Hall, Planning Department, 1 Plaza, 2nd Floor, Patterson, California, during normal business hours. The Planning Commission agenda and supporting public documents are also available online on the City web site www.ci.patterson.ca.us listed under Agenda Center “Planning Commission” At the above noted time and place, testimony from interested persons will be heard by the Planning Commission and duly considered prior to making a recommendation. Any material submitted to the Planning Commission for consideration (photographs, petitions, letters, etc.) will be retained by the City and cannot be returned. If a challenge to the above application is made in court, persons may be limited to raising only those issues they or someone else raised at the Public Hearing.

Lisa Ochoa, Administrative Assistant II, Community Development Department

← All documents from this meeting