Title Projects - Street Description-From Description-To Type Description Est Useful Life Min Est Useful Life Max Est Start Est Completion Ward Avenue Overlay Ward Avenue Las Palmas Ave N. 9th Street 2.5" AC Overlay 2.5" AC Overlay 10 15 1-Aug-2024 28-Feb-2025 City Slurry Seal and Crack Seal
ABELIA LN: MARIGOLD DR to
AZALEA DR, CALVINSON PKWY:

WARD AVE TO Baldwin Rd,
American eagle: ward to End,
heartland Ranch: Ward to Pipit,
Shearwater Drive: Baldwin Rd to
Red Robin, Cliff Swallow:

Baldwin Rd to end, Lemon
Blossom: Garden Patch to
Imperial Lily, Park Center Drive:

Sperry to Keystone Pacific
Parkway, Miraggio: Ward to
End, Keystone Pacific Parkway:

Rogers Rd to Baldwin Rd, *All
locations subject to change, and
will be selected based on
priority, need and resources
throughout the year.

ABELIA LN: MARIGOLD DR to
AZALEA DR, CALVINSON PKWY:

WARD AVE TO Baldwin Rd,
American eagle: ward to End,
heartland Ranch: Ward to Pipit,
Shearwater Drive: Baldwin Rd to
Red Robin, Cliff Swallow:

Baldwin Rd to end, Lemon
Blossom: Garden Patch to
Imperial Lily, Park Center Drive:

Sperry to Keystone Pacific
Parkway, Miraggio: Ward to
End, Keystone Pacific Parkway:

Rogers Rd to Baldwin Rd, *All
locations subject to change, and
will be selected based on
priority, need and resources
throughout the year.

ABELIA LN: MARIGOLD DR to
AZALEA DR, CALVINSON PKWY:

WARD AVE TO Baldwin Rd,
American eagle: ward to End,
heartland Ranch: Ward to Pipit,
Shearwater Drive: Baldwin Rd to
Red Robin, Cliff Swallow:

Baldwin Rd to end, Lemon
Blossom: Garden Patch to
Imperial Lily, Park Center Drive:

Sperry to Keystone Pacific
Parkway, Miraggio: Ward to
End, Keystone Pacific Parkway:

Rogers Rd to Baldwin Rd, *All
locations subject to change, and
will be selected based on
priority, need and resources
throughout the year.

Slurry Seal and Crack Seal Slurry Seal and Crack Seal 5 7 1-Aug-2024 31-Oct-2024 9th Street Improvements 9th Street Las Palmas Ave Sperry Ave Construction: Complete
reconstruction of roadway section
Full Depth Reconstruction of
Road, new road section:
estimated 2" HMA/9" AB 15 20 1-Mar-2025 1-Aug-2025
Sunset Court Improvements Sunset Court Ward Ave Sunset Court Construction: Complete
reconstruction of roadway section
Full Depth Reconstruction of
Road, new road section:
estimated 2" HMA/9" AB 15 20 1-Mar-2025 1-Aug-2025