Cities Index.
agenda-report Accept all bids for the Pedestrian Controlled Crosswalk Safety Project, award construction to Zara Construction, Inc., authorize Staff to execute the Contract and authorize the Finance Department to allocate additional funds in the amount of $903,685.00 from Fund 329.

Patterson City Council
August 20, 2024

Document
agenda-report Accept all bids for the Pedestrian Controlled Crosswalk Safety Project, award construction to Zara Construction, Inc., authorize Staff to execute the Contract and authorize the Finance Department to allocate additional funds in the amount of $903,685.00 from Fund 329.
Meeting
August 20, 2024
Body
Patterson City Council
Original file
98 KB
Text extracted from the city's file for reading and search. Open the original on pattersonca.iqm2.com. That file is the official record.

City Council Agenda Report
TO: Mayor Clauzel and Members of the City Council
FROM: Ken Irwn, City Manager
BY: Fernando Ulloa, City Engineer
MEETING DATE: August 20, 2024
ITEM NO: 6.6
SUBJECT: Accept all bids for the Pedestrian Controlled Crosswalk Safety Project, award construction to Zara Construction, Inc., authorize Staff to execute the Contract and authorize the Finance Department to allocate additional funds in the amount of $903,685.00 from Fund 329.

RECOMMENDATION
Motion to Accept all bids for the Pedestrian Controlled Crosswalk Safety Project, award construction to Zara Construction, Inc., authorize Staff to execute the Contract and authorize the Finance Department to allocate additional funds in the amount of $903,685.00 from Fund 329.

BACKGROUND
The City was awarded $908,280 in funding through the Measure L Community Connection or Rail Services Grant to make necessary pedestrian improvements at two specific locations. The grant also has a 5% local Measure L funding match. During the design phase, a third location by Walnut Grove School was added. The third location will be paid for with local Measure L Dollars only.

ANALYSIS
The proposed Project will install two new pedestrian crosswalks and upgrade another existing crosswalk with new pedestrian safety elements. The existing crosswalk on Sperry Avenue and 9th Street will be upgraded with a High Intensity Activated Crosswalk (HAWK) System on mast arms, with new striping, and ADA ramps. A new crosswalk will be constructed on Ward Avenue and Las Palmas Avenue/Mackilhaffy Drive with a rectangular Rapid Flashing Beacon (RRFB) System on mast arms, with new striping, and ADA ramps. Another new crosswalk will be installed on Hartley Street and Somerset Way. These improvements include a new ADA ramp, streetlight, bike lane delineators, with striping and signage to increase pedestrian and bike safety in the vicinity of Walnut Grove School.

Expected benefits for the new pedestrian safety elements include safer access to StanRTA facilities and an increase in walking trips by residents to nearby schools, grocery stores, health care centers, active recreation centers, and employment centers.

FISCAL IMPACT
This project was advertised on the CIP List, the City’s website, and the Patterson Irrigator Newspaper. Bid opening was held on July 18, 2024 at 2:00 P.M. The City received two (2) bids for this project. The two bids received are listed below from lowest to highest:

Bids
Zara Construction, Inc. $967,186.00
McFadden Construction, Inc. $1,264,676.00
After reviewing the bid documents, Zara Construction, Inc., was deemed the lowest responsible bidder.

Budget for this project is as follows:
$ 967,186.00 Base Bid
$ 96,718.60 10% Contingency
$ 1,063,904.60 TOTAL
Funding for this Project is as follows:
$8,011 Measure L Local Funds - 5% Grant Match
(previously appropriated)
$152,209.00 Measure L Community Connections Grant
(previously appropriated)
$219,131.00 Measure L Local Funds - Additional Crosswalk Location $34,227.70 Measure L Local Funds - 5% Grant Match
$650,326.30 Measure L Community Connections Grant
$1,063,904.60 Total Funds Available
Authorize the Finance Department to allocate funds in the amount of $903,685.00 from the unobligated fund balance in fund 329 number to account number 329-000-7400.