The proposed Zone Reclassification No. 328 will apply an R-40 overlay zone to the 69 parcels thereby increasing their allowable density up to 40 dwelling units per acre. The proposed Zone Code Amendment No. 190 will amend Title 18 Zoning, for the creation of development standards for the R-40 Overlay Zone. It will also amend Title 18 Zoning by creating Objective Design Standards and a streamlined ministerial approval process for affordable housing proposals as required by California Senate Bill 35.
Planning Commission
On June 5, 2023, the Planning Commission held a public hearing and voted 4-0 recommending City Council approval of Zone Reclassification No. 328, Zone Code Amendment No.190 and an Addendum to a Mitigated Negative Declaration.
Environmental Analysis:
In consultation with the City, Rincon Consultants, Inc. prepared a Mitigated Negative Declaration Addendum to the previously adopted Housing Element IS-MND (Initial StudyMitigated Negative Declaration). Pursuant to the provisions of the California Environmental Quality Act (CEQA) Guidelines, Section 15164, a Lead Agency shall prepare an Addendum to an Environmental Impact Report (EIR) or IS-MND if some changes or additions are necessary that will not have significant new impacts or substantially increase previously identified significant impacts. Specifically, the CEQA Guidelines state:
• The lead agency or responsible agency shall prepare an addendum to a previously certified EIR or adopted negative declaration if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred (Section 15164(a));
• An addendum need not be circulated for public review but can be included in or attached to the final EIR or adopted negative declaration (Section 15164€);
• The decision-making body shall consider the addendum with the final EIR or adopted negative declaration prior to making a decision on the project (Section 15164(d)); and
• A brief explanation of the decision not to prepare a subsequent EIR or negative declaration pursuant to Section 15162 should be included in an addendum to an EIR or negative declaration, the lead agency’s findings on the project, or elsewhere in the record. The explanation must be supported by substantial evidence (Section 15164(e)).
CITY COUNCIL AGENDA REPORT – MEETING OF SEPTEMBER 12, 2023 SECOND READING – ADOPTION OF ORDINANCE NO. 1173 APPROVING ZONE RECLASSIFICATION NO. 328 TO APPLY AN R-40 OVERLAY TO THE HOUSING ELEMENT SITES AND ADOPTION OF ORDINANCE NO. 1174 APPROVING ZONE CODE AMENDMENT NO. 190
In compliance with applicable requirements of the California Environmental Quality Act of 1970 (as amended) and the CEQA Guidelines, an Addendum to the previously adopted 2021-2029 Housing Element MND has been produced.
According to Section 15164 of the CEQA Guidelines, an addendum to a previously certified EIR or Negative Declaration (ND) is the appropriate environmental document in instances when “only minor technical changes or additions are necessary” and when the new information does not involve new significant environmental effects beyond those identified in the previous MND.
Conclusion:
Staff recommends the adoption of Ordinance No. 1173, approving Zone Reclassification No. 328 and adopt Ordinance No. 1174 approving Zone Code Amendment No. 190. If adopted, Ordinance 1173 and Ordinance 1174 will become effective 30 days from the adoption date.
Steve Carmona
SC:AB:EF:jj
Enclosures: 1) Ordinance No. 1173
2) Ordinance No. 1174
ORDINANCE NO. 1173
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PICO
RIVERA, CALIFORNIA, APPROVING A ZONE RECLASSIFICATION TO APPLY AN R-40 OVERLAY ZONE TO THE HOUSING ELEMENT SITES AS DESCRIBED IN ATTACHMENT “A” ATTACHED HERETO AND
FURTHER DESIGNATED HEREIN AS ZONE RECLASSIFICATION NO.
328 AND APPROVE AN ADDENDUM TO THE MITIGATED NEGATIVE
DECLARATION FOR THE SIXTH CYCLE 2021-2029 HOUSING
ELEMENT
WHEREAS, the State of California Department of Housing and Community Development requires that cities identify areas within the City to meet the sixth cycle 2021-2029 Housing Element Regional Housing Needs Assessment (RHNA); and WHEREAS, the City must amend the zoning classification to parcels to meet the RHNA as per the Sixth Cycle 2021-2029 Housing Element; and WHEREAS, per Section 18.62.190 of the Pico Rivera Municipal Code the Community and Economic Development Director initiated the zoning reclassification; and WHEREAS, Section 18.62.230 of the Pico Rivera Municipal Code authorizes the City Council of City of Pico Rivera, upon receipt of Resolution from the Planning Commission of the City of Pico Rivera, upon holding of public hearing, upon hearing all testimony, upon examination and review of the investigative staff report and upon conclusion of the public hearing to make determinations and findings of fact as deemed necessary in the best interest of all parties involved and approve the Planning Commission recommendation to adopt the zoning reclassifications; and WHEREAS, the City Council of the City of Pico Rivera conducted a public hearing to consider a Zone Reclassification to amend the zoning to several properties; and WHEREAS, the City Council of the City of Pico Rivera has carefully considered all pertinent testimony and the staff report offered in the case as presented at the public hearing; and
NOW THEREFORE, BE IT ORDAINED by the City Council of the City of Pico Rivera as follows:
SECTION 1. The City Council finds that the above recitals are true and correct and incorporated herein as part of the findings.
SECTION 2. A Mitigated Negative Declaration (MND) Addendum included as Attachment “B” was prepared in accordance with Section 15164 of the California Environmental Quality Act (“CEQA”) Guidelines, which based on substantial evidence set Enclosure 1
5a
ORDINANCE NO. 1173
forth in the record, including but not limited to the Addendum, staff report, and public comment, the City Council finds, that an addendum to the MND is the appropriate document for disclosing the minor changes and additions that are necessary to assess the potential environmental impacts of the Project. The City Council hereby finds and determines that none of the conditions under Sections 15162(a)(1)-(3) of the CEQA Guidelines requiring subsequent environmental review have occurred.
SECTION 3. In accordance with Section 18.66.040, Zone classifications additions of the Pico Rivera Municipal Code, the Zone Classification to amend real properties described in Attachment “A”, are hereby amended and further designated herein as Zone Reclassification No. 328.
SECTION 4. The Zone Reclassification shall be in accordance with the provisions of the Zoning Ordinance adopted by the City Council of the City of Pico Rivera by Ordinance No. 534, adopted April 7, 1975.
SECTION 5. In accordance with Section 18.08.060, Official Zone Map and
18.62.090, Statutory and City Council Authority, the Zoning Ordinance is hereby amended which is comprised of the real properties described on Attachment “A” attached hereto.
SECTION 6. This Zone Reclassification is adopted by Ordinance pursuant to public hearings held before the City Planning Commission and City Council.
SECTION 7. The City Council finds that the Zone Reclassification is consistent with the sixth cycle 2021-2029 Housing Element of the General Plan which is required by the State of California.
SECTION 8. If any part of this Ordinance, or its application to any person or circumstance, is held to be invalid, the remainder of the ordinance, including the application or provision to other persons or circumstances, shall not be affected and shall continue in full force and effect. To this end, the provisions of this ordinance are severable.
SECTION 9. The City Clerk shall certify to the passage and adoption of this Ordinance, causing it to be posted as required by law, and it shall be effective thirty (30) days after its adoption.
[Signatures on following page]
ORDINANCE NO. 1173
APPROVED AND ADOPTED this 12th day of September, 2023.
________________________________
Erik Lutz, Mayor
ATTEST: APPROVED AS TO FORM:
________________________________ _________________________________ Cynthia Ayala, Jr. Deputy City Clerk Arnold M. Alvarez-Glasman, City Attorney
STATE OF CALIFORNIA )
) §
COUNTY OF LOS ANGELES )
I, Cynthia Ayala, Jr. Deputy City Clerk of the City of Pico Rivera, do hereby certify that the foregoing Ordinance No. 1173 was adopted at a regular meeting of the City Council of the City of Pico Rivera, held on Tuesday, September 12, 2023, with the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________
Cynthia Ayala, Jr. Deputy City Clerk
ZONE RECLASSIFICATION NO. 328
ATTACHMENT “A”
NO. PARCEL NUMBER SITE
ADDRESS EXISTING ZONING EXISTING GENERAL PLAN
EXISTING
OVERLAY
ZONE
PROPOSED
OVERLAY
ZONE
1 5272-004-035 8540 BEVERLY
BLVD
COMMUNTY
COMMERCIAL (C-C)
COMMERCIAL
(C) R40-OV
2 5272-005-012 8642 BEVERLY
BLVD
COMMUNTY
COMMERCIAL (C-C)
COMMERCIAL
(C) R40-OV
3 5272-005-045 8554 BEVERLY
BLVD
COMMUNTY
COMMERCIAL (C-C)
COMMERCIAL
(C) R40-OV
4 5272-017-019 (1) 4335 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
5 5272-018-900 IBSEN ST PUBLIC FACILITIES (PF)
PUBLIC
FACILITY (P-F) R40-OV
6 5272-018-901 IBSEN ST SINGLE-FAMILY (S-F) PUBLIC
FACILITY (P-F) R40-OV
7 5272-018-902 8736 IBSEN ST SINGLE-FAMILY (S-F) PUBLIC FACILITY (P-F) R40-OV
8 5272-018-903 8804 IBSEN ST SINGLE-FAMILY (S-F) PUBLIC FACILITY (P-F) R40-OV
9 5272-022-024 (1) 8923 BEVERLY
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
10 5272-022-025 (1) 8957 BEVERLY
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
11 5272-023-017 (1) 8922 BEVERLY
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
12 5272-023-024 (1) (2) 8914 BEVERLY
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
13 5272-023-027 (1) 8924 BEVERLY
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
14 5272-023-030 (2) 4425 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
15 5272-023-031 (2) 4425 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
16 5272-029-011 (1) 4525 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
17 5272-030-028 (2) 4525 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
18 6368-005-028 7801 ROSEMEAD
BLVD
GENERALINDUSTRIAL (I-G)GENERALINDUSTRIAL (I) R40-OV
19 6368-005-042 7925 ROSEMEAD
BLVD
GENERALINDUSTRIAL (I-G)GENERALINDUSTRIAL (I) R40-OV
20 6369-002-012
8340
WASHINGTON
BLVD
GENERALINDUSTRIAL (I-G)GENERALINDUSTRIAL (I) R40-OV
21 6370-013-014 (1) 6605 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C) R40-OV
22 6370-013-021 (1) 6623 ROSEMEAD
BLVD
COMMUNITYCOMMERCIAL (C-C)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
23 6370-013-032 6505 ROSEMEAD
BLVD
COMMUNITYCOMMERCIAL (C-C)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
24 6370-022-025
8605
WASHINGTON
BLVD
COMMUNITYCOMMERCIAL (C-C)COMMERCIAL
(C) R40-OV
ORDINANCE NO. ______
PAGE 2 OF 3
NO. PARCEL NUMBER SITE
ADDRESS EXISTING ZONING EXISTING GENERAL PLAN
EXISTING
OVERLAY
ZONE
PROPOSED
OVERLAY
ZONE
25 6370-024-033 (1)
8701
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
26 6370-025-009 (1)
8737
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
27 6370-027-014 (1)
8809
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
28 6370-027-018 (1)
8825
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
29 6370-027-021
8913
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C) R40-OV
30 6371-001-026 (1) 6101 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
31 6371-001-027 (1) 6003 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
32 6377-003-032 9100 WHITTIER
BLVD
COMMUNITY
PLANNED
DEVELOPMENT (CPD)
COMMERCIAL
(C) R40-OV
33 6377-003-033 9050 WHITTIER
BLVD
COMMUNITY
PLANNED
DEVELOPMENT (CPD)
COMMERCIAL
(C) R40-OV
34 6377-003-036 5006 ROSEMEAD
BLVD
COMMUNITY
PLANNED
DEVELOPMENT (CPD)
COMMERCIAL
(C) R40-OV
35 6378-017-001 (1) 6508 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
36 6378-017-004 (1) 6540 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED USE
(M-U) R40-OV
37 6378-019-019 (1) 6750 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
38 6378-019-037 (1)
9055
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
39 6378-019-052 (1)
9033
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
40 6378-019-053 (1)
9049
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
41 6378-019-058 (1) 6730 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
42 6378-019-071 (1) 6722 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
43 6378-019-072 (1) 6620 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
44 6378-020-026
9107
WASHINGTON
BLVD
COMMUNITYCOMMERCIAL (C-C)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
45 6378-029-022 (2)
9337
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
46 6378-029-801 (2)
9317
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
47 6378-029-802 (2) COMMERCIALGENERAL (C-G)
COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
ORDINANCE NO. _____
PAGE 3 OF 3
NO. PARCEL NUMBER SITE
ADDRESS EXISTING ZONING EXISTING GENERAL PLAN
EXISTING
OVERLAY
ZONE
PROPOSED
OVERLAY
ZONE
48 6378-029-900 (2) 6767 PASSONS
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
49 6379-034-024 (2)
9437
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
50 6379-034-025 (2) 6750 PASSONS
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
51 6379-034-026 (2) 6758 PASSONS
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
52 6379-034-027 (2)
9411
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
53 6381-014-007 7226 ROSEMEAD
BLVD
COMMUNITYCOMMERCIAL (C-C)COMMERCIAL
(C) R40-OV
54 6382-018-029 9011 BERMUDEZ
ST
LIGHT-INDUSTRIAL (IL)LI - LIGHT
INDUSTRIAL R40-OV
55 6382-021-036 (2) 9315 SLAUSON AVE COMMERCIALGENERAL (C-G)
COMMERCIAL
(C) R40-OV
56 6382-021-038 (2) 9335 SLAUSON AVE COMMERCIALGENERAL (C-G)
COMMERCIAL
(C) R40-OV
57 6382-021-040 (2) 9311 SLAUSON AVE COMMERCIALGENERAL (C-G)
COMMERCIAL
(C) R40-OV
58 6382-021-041 (2) 9335 SLAUSON AVE COMMERCIALGENERAL (C-G)
COMMERCIAL
(C) R40-OV
59 6383-001-025 (2)
9414
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED- USE
(M-U) R40-OV
60 6383-001-026 (2)
9414
WASHINGTON
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED- USE
(M-U) R40-OV
61 8121-025-017 4502 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
62 8121-026-017 4518 ROSEMEAD
BLVD
COMMERCIALGENERAL (C-G)COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
63 8121-026-020 9001 BEVERLY RD COMMERCIALGENERAL (C-G)
COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
64 8122-005-039 4334 SAN GABRIEL
RIVER PKWY
INDUSTRIAL
PLANNED
DEVELOPMENT (IPD)
LI - LIGHT
INDUSTRIAL R40-OV
65 8122-011-027 9612 BEVERLY
BLVD
INDUSTRIAL
PLANNED
DEVELOPMENT (IPD)
LI - LIGHT
INDUSTRIAL R40-OV
66 6368-017-002 (1) 8345 TELEGRAPH
RD
PROFESSIONALADMINISTRATIVE (PA)
COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
67 6368-017-003 (1) 8359 TELEGRAPH
RD
PROFESSIONALADMINISTRATIVE (PA)
COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
68 6368-017-005 (1) 8432 BIRCHBARK
AVE
PROFESSIONALADMINISTRATIVE (PA)
COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
69 6368-017-006 (1) 8337 TELEGRAPH
RD
PROFESSIONALADMINISTRATIVE (PA)
COMMERCIAL
(C)
MIXED-USE
(M-U) R40-OV
Note: 1. Sites used in previous housing element update cycles subject to by-right per Housing Program.
Note 2. An analysis of small sites identified in the City’s inventory can be found in Table B‐3 of the 6th Cycle Housing Element.
Zone Code Amendments and Zone
Reclassification
Addendum to the Pico Rivera 6th Cycle
Housing Element Update IS-MND
(SCH#2021120397)
prepared by
City of Pico Rivera
Community and Economic Development Department
6615 Passons Boulevard
Pico Rivera, California 90660
Contact: Estefany Franco, Planner
prepared with the assistance of
Rincon Consultants, Inc.
250 East 1st Street, Suite 1400
Los Angeles, California 90012
February 2023
ATTACHMENT "B"
Zone Code Amendments and Zone
Reclassification
Addendum to the Pico Rivera 6th Cycle
Housing Element Update IS-MND
(SCH#2021120397)
prepared by
City of Pico Rivera
Community and Economic Development Department
6615 Passons Boulevard
Pico Rivera, California 90660
Contact: Estefany Franco, Planner
prepared with the assistance of
Rincon Consultants, Inc.
250 East 1st Street, Suite 1400
Los Angeles, California 90012
February 2023
This report prepared on 50% recycled paper with 50% post-consumer content.
Table of Contents
Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND i Table of Contents
1 Introduction....................................................................................................................................1 2 Background.....................................................................................................................................2
2.1 Previously Approved Housing Element Update..................................................................2
2.2 Proposed Zone Amendments and Reclassification.............................................................5 3 Decision Not to Prepare a Subsequent EIR or MND.......................................................................7 4 Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification .8
4.1 Aesthetics............................................................................................................................9
4.2 Agriculture and Forestry Resources..................................................................................10
4.3 Air Quality .........................................................................................................................11
4.4 Biological Resources..........................................................................................................16
4.5 Cultural Resources............................................................................................................19
4.6 Energy ...............................................................................................................................21
4.7 Geology and Soils..............................................................................................................23
4.8 Greenhouse Gas Emissions...............................................................................................24
4.9 Hazards and Hazardous Materials ....................................................................................26
4.10 Hydrology and Water Quality ...........................................................................................28
4.11 Land Use Planning.............................................................................................................30
4.12 Mineral Resources ............................................................................................................31
4.13 Noise .................................................................................................................................31
4.14 Population and Housing....................................................................................................36
4.15 Public Services...................................................................................................................37
4.16 Recreation.........................................................................................................................39
4.17 Transportation ..................................................................................................................40
4.18 Tribal Cultural Resources..................................................................................................43
4.19 Utilities and Service Systems ............................................................................................45
4.20 Wildfire..............................................................................................................................49 5 Conclusion.....................................................................................................................................50 6 References and Preparers.............................................................................................................51
6.1 References ........................................................................................................................51
6.2 List of Preparers................................................................................................................51 Tables
Table 1 Pico Rivera 6th Cycle Housing Element Update RHNA ........................................................2 Table 2 Summary of Sites Inventory................................................................................................6 Table 3 Daily Construction Emissions per Year..............................................................................14 Table 4 Daily Operational Emissions..............................................................................................15 City of Pico Rivera
Zone Code Amendments and Zone Reclassification
ii
Table 5 Annual Emissions ..............................................................................................................25 Table 6 Normal Year Supply and Demand Comparison (AF).........................................................46 Table 7 Single Dry Year Supply and Demand Comparison (AF).....................................................47 Table 8 Multiple Dry Years Supply and Demand Comparison (AF) ...............................................47 Figures
Figure 1 Regional Location Map .......................................................................................................3 Figure 2 Candidate Housing Sites .....................................................................................................4 Appendices
Appendix A CalEEMod Results
Appendix B VMT Analysis
Introduction
Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 1 1 Introduction
This document is an Addendum to the Pico Rivera 6th Cycle Housing Element Update Initial Study – Mitigated Negative Declaration (IS-MND). This Addendum has been prepared in accordance with relevant provisions of the California Environmental Quality Act (CEQA) of 1970 (as amended) and the CEQA Guidelines.
In accordance with Section 15164 of the CEQA Guidelines, a lead agency shall prepare an addendum to an adopted negative declaration as the appropriate environmental document in instances when “only minor changes or additions are necessary” that will not have significant new impacts or substantially increase previously identified significant impacts. Specifically, Section 15164 of the CEQA Guidelines states:
An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calling for preparation of a subsequent Environmental Impact Report (EIR) or negative declaration have occurred (Section 15164(b));
An addendum need not be circulated for public review but can be included in or attached to the final EIR or adopted negative declaration (Section 15164(c)); The decision-making body shall consider the addendum with the final EIR or adopted negative declaration prior to making a decision on the project (Section 15164(d)); and A brief explanation of the decision not to prepare a subsequent EIR or negative declaration pursuant to Section 15162 should be included in an addendum to an EIR or negative declaration, the lead agency's findings on the project, or elsewhere in the record. The explanation must be supported by substantial evidence (Section 15164(e)).
This Addendum describes the details of the proposed Zone Code Amendments and Zone Reclassification (herein referred to as “proposed Zone Amendments and Reclassification” or “proposed Project”) and compares project impacts to those identified in the final IS-MND adopted by City of Pico Rivera in 2022 for the Pico Rivera 6th Cycle Housing Element Update (herein referred to as “approved Housing Element Update”). Specifically, Section 2, Background, contains a description of the approved Housing Element Update and proposed Zone Amendments and Reclassification, whereas the analysis in Section 4, Environmental Checklist and Impacts of the Proposed Project, demonstrates that the proposed Project would not result in any new significant environmental impacts or any substantial increase in the severity of previously identified significant environmental impacts compared to the approved Housing Element Update. Consequently, this Addendum is the appropriate environmental document for the proposed Zone Amendments and Reclassification under CEQA.
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
2 2 Background
The final IS-MND for the Pico Rivera 6th Cycle Housing Element Update (State Clearinghouse [SCH]#2021120397; “approved Housing Element Update”) was adopted in September 2022 and is herein referred to as “2022 IS-MND”. The approved Housing Element Update includes the City’s Housing Policy Plan for the 2021-2029 6th Cycle planning period, which in turn includes goals, policies, and programs concerning housing and housing-related services, as well as the City’s approach to addressing its share of the regional housing need. The 2022 IS-MND provides an analysis of the potential environmental impacts resulting from implementation of the Housing Element Update, including the General Plan Amendment for adoption of the Housing Element Update into the City’s General Plan. No other entitlements, including zone code changes, were proposed as part of the Housing Element Update analyzed in the 2022 IS-MND. Information and technical analyses from the 2022 IS-MND are utilized and/or referenced throughout this Addendum.
The City of Pico Rivera now proposes zone code changes in the form of a new overlay zone and objective design standards (“proposed Zone Amendments and Reclassification” or “proposed Project”) to further implement the approved Housing Element Update since adoption of the 2022 ISMND. This section provides an overview of the previously approved Housing Element Update, the accompanying 2022 IS-MND, and the proposed Zone Amendments and Reclassification to provide context for this Addendum prior to evaluating the potential environmental impacts of the proposed Project.
2.1 Previously Approved Housing Element Update
The City approved the Pico Rivera 6th Cycle Housing Element Update on September 27, 2022. For the 2021-2029 6th Cycle planning period, the Southern California Association of Governments (SCAG) identified a regional housing needs assessment (RHNA) allocation of 1,024 units. To meet the City’s RHNA allocation, the approved Housing Element Update identified 69 candidate housing sites covering 91.7 acres in the city, which were determined by the City to be available to accommodate the City’s RHNA allocation by income level. Figure 1 shows the regional location of the city and shows the location of the 69 candidate sites within the city. Table 1 shows the breakdown of the City’s RHNA by four income categories: very low income, low income, moderate income, and above moderate income.
Table 1 Pico Rivera 6th Cycle Housing Element Update RHNA Income Category Percent of County AMFI Units Percent
Very Low 0-50% 299 29%
Low 51-80% 146 14%
Moderate 81-120% 149 15%
Above Moderate >120% 430 42%
Total -- 1,024 100%
AMFI = Average Median Family Income
Source: Pico Rivera 2021
Background
Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 3 Figure 1 Regional Location Map
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
4 Figure 2 Candidate Housing Sites
Background
Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 5 As shown in Table 1, the City’s RHNA allocation for lower-income housing is 445 housing units, including 299 very-low-income housing units and 146 low-income housing units. The City has identified several sites currently located on non-residentially zoned parcels that could accommodate lower-income housing. The City’s General Commercial Zone and Special Commercial Zone allow for development of housing in a mixed-use setting at a density of 20 dwelling units per acre (du/ac). In addition, affordable units can be accommodated through accessory dwelling unit (ADU) development throughout the city. The City’s RHNA allocation for moderate-income housing is 579 housing units, including 149 moderate-income housing units and 430 above-moderate-income housing units. The City anticipates growth to meet the moderate- and above-moderate- income need from existing residentially and commercially zoned parcels (that presently permit residential development as a primary use) through the development of new units and through the development of ADUs and junior accessory dwelling units (JADUs) (Pico Rivera 2021).
The approved Housing Element Update does not directly propose new residential or other development on any of the 69 candidate housing sites identified in the Housing Element Update; rather, it demonstrates capacity for future development consistent with State law. Nonetheless, the 2022 IS-MND evaluated potential environmental impacts associated with implementation of the Housing Element Update and identified mitigation measures to reduce significant environmental impacts to a less-than-significant level. The 2022 IS-MND assumed project buildout by 2029 to meet the City’s RHNA allocation of 1,024 housing units and analyzed a potential development capacity of 1,332 housing units, which includes a 30 percent buffer atop the original RHNA allocation. The 2022 IS-MND also acknowledges that an additional 400 ADUs are proposed throughout the city (Pico Rivera 2021). The following is a summary of the overall goals identified by the City for the approved Housing Element Update (Pico Rivera 2021):
Preservation and Improvement of existing housing stock and neighborhoods; Access to opportunities for affordable housing;
Adequate supply and of housing and identification of resources for households with special needs;
Identification of adequate sites to meet the existing and future housing needs of the City at all income levels;
Evaluation of governmental constraints; and
Fair housing opportunities for all segments of the community, regardless of age, race, religion, sex, marital status, sexual orientation, ancestry, national origin, or disability.
2.2 Proposed Zone Amendments and Reclassification
The 2022 IS-MND assumed that future housing on the 69 candidate housing sites would be developed to have greater density than assumed in the City’s General Plan and SCAG growth projections. To meet the RHNA allocation for the 6th Cycle planning period, the proposed Zone Amendments and Reclassification involves the creation of the new R-40 Overlay Zone to apply to the 69 candidate sites, which would allow a density of up to 40 du/ac. The proposed Zone Amendments and Reclassification does not change the number or location of any candidate sites in the city. Furthermore, the R-40 Overlay Zone would be in addition to the existing zoning and would not change the existing underlying zoning. Property owners would still have the ability to exercise the development standards associated with their existing zone. The intent of the R-40 Overlay Zone City of Pico Rivera
Zone Code Amendments and Zone Reclassification
6 is to provide property owners and developers with additional options should they seek to develop affordable housing units. Table 2 shows the breakdown of the sites by income category identified to accommodate the 1,732 housing units, including a potential development capacity of 1,332 housing units from the R-40 Overlay Zone and an additional 400 ADUs in single-family residential areas.
Table 2 Summary of Sites Inventory
Extremely Low/
Very Low Income
Low
Income
Moderate
Income
Above
Moderate Income Total
Sites Available
R-40 Overlay Zone 239 371 722 1,332
ADU Production 272 8 120 400
Total Units Available 511 379 842 1,732
Unit Surplus 66 230 412 708
Source: Pico Rivera 2021
To incentivize development, the State requires that a streamlined process occur for affordable housing units that were identified in the approved Housing Element Cycle. As such, through the use of the R-40 Overlay Zone, a Conditional Use Permit will not be required for developers wishing to develop affordable housing units within the 69 candidate sites. As part of the proposed Project, the City has also prepared objective design standards which developers would have to meet to utilize the streamlined process per Senate Bill (SB) 35. The objective design standards would be applicable to any by-right residential or mixed-use project qualifying for a streamlined, ministerial approval (no matter its location within the city), and would address items such as (but not limited to) site design, building mass, lighting, and open space.
Decision Not to Prepare a Subsequent EIR or MND
Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 7 3 Decision Not to Prepare a Subsequent EIR
or MND
As outlined in Section 15164(b) of the CEQA Guidelines, a lead agency shall prepare an addendum to an adopted negative declaration if only minor technical changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR or negative declaration have occurred.
As discussed in the following impact analysis, the technical changes and additions associated with the proposed Zone Amendments and Reclassification would not introduce new significant environmental impacts beyond those that have already been identified and characterized in the 2022 IS-MND for the approved Housing Element Update. None of the conditions described in Section 15162 of the CEQA Guidelines calling for preparation of a subsequent EIR or MND have occurred or would occur as a result of the proposed Project. Therefore, this Addendum to the adopted 2022 IS-MND for the approved Housing Element Update is consistent with CEQA, and is the appropriate level of environmental documentation to provide under CEQA. This Addendum will be considered by the City of Pico Rivera decision-making body in making a determination on the proposed Zone Amendments and Reclassification.
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
8 4 Environmental Checklist and Impacts of
the Proposed Zone Amendments and
Reclassification
This Addendum evaluates potential environmental impacts that could result from the proposed Zone Amendments and Reclassification. The existing environmental conditions throughout the city, and within the 69 candidate housing sites, are substantially the same under present conditions as described in the approved Housing Element Update. Nonetheless, the analysis below provides updates where necessary to characterize potential impacts associated with the proposed Project.
Appendix G of the CEQA Guidelines provides a checklist of environmental issues areas that are suggested as the issue areas that should be assessed in CEQA analyses. Consistent with the impacts analyses included in the 2022 IS-MND for the approved Housing Element Update, this Addendum addresses all 20 environmental issue areas included in Appendix G of the CEQA Guidelines, as listed:
1. Aesthetics
2. Agriculture and Forestry Resources
3. Air Quality
4. Biological Resources
5. Cultural Resources
6. Energy
7. Geology and Soils
8. Greenhouse Gas Emissions
9. Hazards and Hazardous Materials
10. Hydrology and Water Quality
11. Land Use Planning
12. Mineral Resources
13. Noise
14. Population and Housing
15. Public Services
16. Recreation
17. Transportation
18. Tribal Cultural Resources
19. Utilities and Service Systems
20. Wildfire
The 2022 IS-MND assumed project buildout by 2029 to meet the City’s RHNA allocation of 1,024 housing units and analyzed a potential development capacity of 1,332 housing units, which includes a 30 percent buffer atop the original RHNA allocation. Potential environmental impacts of the proposed Zone Amendments and Reclassification are analyzed to determine whether impacts are consistent with the impact analysis provided in the 2022 IS-MND for the approved Housing Element Update, and whether additional mitigation measures are required to minimize or avoid potential impacts. Where impacts are identified in the following analysis, discussion of existing applicable regulations and identified mitigation measures from the 2022 IS-MND are included as relevant to the avoidance of potential impacts from the proposed Project. As discussed in Section 2.2, Proposed Zone Amendments and Reclassification, the City assumed a potential development capacity of 1,332 housing units in the 69 candidate housing sites from the R-40 Overlay Zone and an additional 400 ADUs in single-family residential areas. While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, the analysis in this Addendum evaluates impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the proposed Project.
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 9
4.1 Aesthetics
As discussed in Section 4.1, Aesthetics, of the 2022 IS-MND , aesthetic impacts from implementation of the 2022 approved Housing Element Update would be less than significant with mitigation required. The proposed Project would not result in direct housing construction but would facilitate and provide a policy framework for future housing development throughout the City. The City of Pico Rivera General Plan (General Plan) does not identify any scenic vistas in the City. There are no State- or County-designated scenic highways in or near the City. The Arroyo Seco Historic Parkway Scenic Byway (federal byway) is approximately nine miles northwest of the City’s northwestern boundary. Because there are no State- or County-designated scenic highways in or proximate to the City, similar to the approved Housing Element Update, housing development under the proposed Project would not damage scenic resources and there would be no impact associated with scenic vistas and scenic highways.
Future housing development under the approved Housing Element Update would require consistency with General Plan policies and compliance with Pico Rivera Municipal Code (Municipal Code) standards, which would be verified through the City’s development review process, and therefore, would not conflict with zoning or regulations governing scenic quality. Further, future housing development would be required to comply with Measure SC AES-1, which requires applicants to provide a lighting and photometric plan demonstrating that there shall not be any light spillage to nearby residential properties. Considering these requirements and the City’s standard conditions, future housing development facilitated by the Housing Element Update would not create new sources of substantial light or glare. Therefore, impacts would be less than significant with mitigation incorporated.
Similar to the approved Housing Element Update, the proposed Project would be required to comply with Measure SC AES-1, which requires applicants to provide a lighting and photometric plan demonstrating that there shall not be any light spillage to nearby residential properties, in order to reduce impacts regarding light and glare. Any development resulting from the proposed Zone Amendments and Reclassification would be subject to these detailed design and development standards, similar to the approved Housing Element Update, and thus, the proposed Project would result in no new impacts related to aesthetics or impacts that would be substantially more severe than those discussed in the 2022 IS-MND for the approved Housing Element Update.
Measure SC AES-1: The applicant shall provide a lighting and photometric plan demonstrating that there shall not be any light spillage to nearby residential properties.
The proposed Zone Amendments and Reclassification identified up to 1,332 residential units on 69 candidate housing sites throughout the city (refer to Figure 2) and an additional 400 ADUs.
Development under the proposed Project would occur in already-developed urban areas, similar to the approved Housing Element Update. The R-40 Zoning Overlay would allow sites to be utilized for higher density low-income projects and increase the density of the sites that utilize the overlay to 40 units per acre. The densities of the candidate housing sites currently range from 25 to 35 units per acre. Implementation of the R-40 Zoning Overlay would increase the density on candidate housing sites by 5 to 15 units per acre, which would likely increase the heights of proposed housing developments. Nonetheless, future housing development under the proposed Project would be subject to the City’s development review process and be required to demonstrate consistency with General Plan policies and Municipal Code standards. Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the City of Pico Rivera
Zone Code Amendments and Zone Reclassification
10 additional residential units under the proposed Project would not result in a new significant impact affecting the existing aesthetic quality of the urban area as they would be compatible with the primary residences of single-family residential areas and they would comply with City development standards.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant with Mitigation (Same as Approved Housing Element Update)
4.2 Agriculture and Forestry Resources
The 2022 approved Housing Element Update area consists of developed urban areas that do not contain Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmlands); agricultural uses; or forest land. Additionally, the approved Housing Element Update area is not under a Williamson Act contract or zoned for agriculture or forestry. No impact on agriculture and forestry resources would occur from implementation of the approved Housing Element Update.
The proposed Zone Amendments and Reclassification do not include any additional candidate housing sites that were not previously evaluated. Similar to the approved Housing Element Update, the proposed Project would not include agriculture or forestry uses and would not introduce nonagriculture or non-forest uses to areas designated/zoned for agriculture or forest land, nor would there be any sites under a Williamson Act contract or zoned for agriculture or forestry in the Plan area. The proposed Project does not change the number or location of any candidate housing sites in the city. Under the proposed Zone Amendments and Reclassification, owners and developers may utilize the R-40 Zoning Overlay in order to increase housing density to 40 units per acre and encourage the development of low-income housing. Similar to the approved Housing Element Update, the proposed Zone Amendments and Reclassification would not result in changes to land use or zoning that could lead to the conversion of agricultural or forested land in the City.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting the existing agricultural or forestry resources provided that they would be built within existing single-family residential areas. As a result, the proposed Project would not introduce new impacts or substantially increased impacts related to agriculture and forestry resources and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
No Impact (Same as Approved Housing Element Update)
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 11
4.3 Air Quality
The 2022 IS-MND determined that the approved Housing Element Update would be consistent with the standards and policies set forth in the 2016 Air Quality Management Plan (AQMP) and would not conflict with or obstruct implementation of the AQMP. The 2022 IS-MND also determined future housing development on candidate housing sites, at a minimum, would be required to meet CALGreen and Energy Code (CCR Title 24, Part 6) mandatory energy requirements in effect at the time of the development application. Projects would benefit from the efficiencies associated with these regulations as they relate to building heating, ventilating, and air conditioning mechanical systems, water heating systems, and lighting. Future housing development facilitated by the approved Housing Element Update would not result in a cumulatively considerable net increase of any criteria pollutant for which the South Coast Air Basin (SCAB) is in nonattainment under an applicable federal or State ambient air quality standard. In regard to sensitive receptor exposure to substantial pollutant concentrations, the approved Housing Element Update would not result in direct housing construction but would facilitate future housing development throughout the city consistent with State Housing laws.
Future housing development facilitated by the approved Housing Element Update would be subject to the City’s development review process to demonstrate that both daily construction emissions and operations would not exceed South Coast Air Quality Management District’s (SCAQMD) significance thresholds for any criteria air pollutant. Future housing development could result in odors generated from vehicles and/or equipment exhaust emissions during construction. Such odors would be temporary and generally would occur at magnitudes that would not affect substantial numbers of people. Therefore, all impacts related to air quality would be less than significant.
While the approved Housing Element Update was not found to have significant and unavoidable air quality impacts, future housing development would be required to follow all standard conditions as well as the following mitigation measures:
Measure SC AQ-1: The following measures shall be incorporated to minimize pollutant emissions associated with construction activities:
Construction activities shall require the use of 2010 and newer diesel haul trucks (e.g., material delivery trucks and soil import/export) to the extent feasible. Under conditions where it is determined that 2010 model year or newer diesel trucks are not readily available or obtainable for a project, the applicant shall be required to provide this evidence to the City and shall instead use trucks that meet USEPA 2007 model year emissions requirements.
All off-road diesel-powered construction equipment greater than 50 horsepower shall meet Tier 4 emission standards, where available. In addition, all stationary construction equipment shall be outfitted with the BACT devices certified by CARB. Any emissions control device used by the contractor shall achieve emissions reductions that are no less than what could be achieved by a Level 3 diesel emissions control strategy for a similarly sized engine as defined by CARB regulations. A copy of each equipment unit’s certified tier specification, BACT documentation, and City of Pico Rivera
Zone Code Amendments and Zone Reclassification
12 CARB or South Coast AQMD operating permit shall be provided to the City at the time of mobilization of each applicable unit of equipment.
Measure SC AQ-2: The applicant shall require by contract specifications that constructionrelated equipment, including heavy-duty equipment, motor vehicles, and portable equipment, shall be turned off when not in use for more than five minutes. Contract specification language shall be reviewed by the City prior to issuance of a grading permit.
Measure SC AQ-3: The applicant shall require by contract specifications that construction operations rely on the electricity infrastructure surrounding the construction site rather than electrical generators powered by internal combustion engines to the extent feasible. Contract specification language shall be reviewed by the City prior to issuance of a grading permit.
Measure SC AQ-4: The applicant shall require by contract specifications that all off-road construction equipment engines shall be maintained in good condition and in proper tune per manufacturer’s specifications, to the satisfaction of the City Engineer. Equipment maintenance records and equipment design specifications data sheets shall be kept onsite during construction for periodic review by the City Inspector. Contract specification language shall be reviewed by the City prior to issuance of a grading permit.
Measure SC AQ-5: A project-specific localized emissions analysis shall be prepared that identifies the project’s construction emissions using either South Coast AQMD’s LST screening tables (for projects that are less than five acres) or dispersion modeling (for projects that exceed five acres in size). Where it is determined that construction emissions would exceed the applicable LSTs or the most stringent applicable federal or state ambient air quality standards, the project shall reduce its daily construction intensity (e.g., reducing the amount of equipment used daily, reducing the amount of soil graded/excavated daily, etc.) and/or use off-road construction equipment outfitted with the most stringent emissions control technology (e.g., equipment meeting Tier 4 emissions standards) such that the project’s resulting construction emissions would no longer exceed South Coast AQMD’s LSTs or result in pollutant emissions that would cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standards.
Measure SC AQ-6: New sensitive land uses shall not be located within 1,000 feet of an existing or proposed distribution center/warehouse facility that generates more than 100 trucks per day, more than 40 trucks with operating TRUs per day, or where TRU unit operations exceed 300 hours per week. Under conditions where the 1,000-feet siting distance cannot be met, a health risk assessment (HRA) shall be conducted to evaluate the health risks to the new sensitive land uses from the TAC emissions generated from the mobile sources associated with the distribution center/warehouse facility. Based on the findings in the HRA, appropriate measures shall be taken, if necessary, to reduce the cancer risk resulting from TAC-exposure from mobile sources to below 10 in one million for the maximally-exposed individual. These measures may include, but are not limited to, implementation of appropriate Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 13 Minimum Efficiency Reporting Value (MERV) filters at the new sensitive land use development.
Measure SC AQ-7: For all residential projects proposed adjacent to the BNSF and Union Pacific railroads, an air quality study shall be prepared to determine the most effective buffering technique to ensure the exterior living areas are not exposed to substantial pollutant concentrations from the railroad.
Appropriate buffering shall be incorporated into the tentative subdivision map or other form of site plan submitted for approval by the City of Pico Rivera.
Measure SC AQ-8: All housing sites shall include air filtration systems designed to have a Minimum Efficiency Reporting Value (MERV) of 13 as indicated by the American Society of Heating Refrigerating and Air Conditioning Engineers (ASHRAE) Standard 52.2. The air handling systems shall be maintained on a regular basis per manufacturers recommendations by a qualified technician employed or contracted by the project proponent. Operation and maintenance of the system shall ensure that it performs at or above the minimum reporting value.
Measure SC AQ-9: Any development within the Emergency Shelter zone shall be designed and sealed inoperable windows combined with HVAC systems.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project.
The approved Housing Element Update identifies policies and programs that could be implemented to provide additional capacity for future development of housing units consistent with State Housing Law. The approved Housing Element Update was found to be consistent with the standards and policies set forth in the 2016 AQMP and did not conflict with or obstruct implementation of the AQMP. The proposed Zone Amendments and Reclassification would increase the population to 67,764 residents by 2045 (see Section 14, Population and Housing). The current 2022 AQMP is based on the population projections in the 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) (Southern California Association of Governments [SCAG] 2020).
Population for Pico Rivera in the 2020-2045 RTP/SCS was estimated at 67,400 by 2045 (SCAG 2020).
This would constitute a 0.5 percent increase over SCAG’s 2045 population projection. In connection with the goals, policies, and programs of the approved Housing Element Update, the proposed Zone Amendments and Reclassification would provide the opportunity for higher-density development with affordable housing units. Individual projects under the proposed Project would be required to comply with applicable federal, State, regional, and local housing laws and policies. Therefore, it is not anticipated that future housing development facilitated by the proposed Zone Amendments and Reclassification would interfere with South Coast AQMD goals for improving air quality in the SCAB or conflict with or obstruct implementation of applicable air quality plans. As such, with respect to conflicting with or obstructing implementation of the applicable air quality plan, the proposed Project would be less than significant which is consistent with the approved Housing Element Update.
Regional and localized construction emissions under the proposed Zone Amendments and Reclassification would be similar in nature to those identified in the approved Housing Element City of Pico Rivera
Zone Code Amendments and Zone Reclassification
14 Update. Construction under the proposed Project would span eight years starting in 2023. As shown in Table 3, the daily construction emissions for each year of construction would be below the SCAQMD thresholds. Implementation of Measures SC AQ-1 through SC AQ-4 from the approved Housing Element Update would also apply to the future housing development under the proposed Project and would further reduce construction emissions. Therefore, due to the level of construction activities, construction emissions are anticipated to remain less than significant, which is consistent with the approved Housing Element Update.
Table 3 Daily Construction Emissions per Year
Estimated Emissions (lbs/day)
Emissions Source ROG NOX CO SOX PM10 PM2.5
2023 4.0 39.8 36.9 0.1 21.7 11.8
2024 7.0 34.4 111.0 0.1 18.5 5.1
2025 6.7 22.5 103.0 0.1 18.4 4.7
2026 5.8 21.1 96.6 0.1 18.3 4.7
2027 18.8 21.5 107.0 0.1 21.5 5.4
2028 18.5 20.6 101.0 0.1 21.5 5.4
2029 18.3 19.4 95.6 0.1 21.5 5.3
2030 18.0 18.3 90.7 0.1 21.5 5.3
SCAQMD Thresholds 75 100 550 150 150 55
Threshold Exceeded? No No No No No No
See Appendix A for CalEEMod results. Note: Totals have been rounded. Construction emissions were pulled from Table 2.2 Construction Emissions by Year, Unmitigated. Daily, Summer (Max) are included as a conservative measure of the proposed Zone Amendments and Reclassification’s predicted emissions.
Source: SCAQMD 2019
Operational emissions from the proposed Zone Amendments and Reclassification would vary from the approved Housing Element Update due to the change in the type of land use anticipated in the proposed Project and associated zoning code amendments. Therefore, the proposed Project’s operational emissions were modeled in California Emissions Estimator Model (CalEEMod) (included as Appendix A) consistent with the methodology of the SCAQMD.1 As shown in Table 4, the net emissions would be below the SCAQMD’s regulatory thresholds for criteria pollutants. 1 Specific single-family residential sites are not identified for buildout of the additional 400 ADUs; however, they would be in single-family residential areas throughout the city. Based on zoning and development standards in Sections 18.40.040 and 18.42.040 of the Municipal Code, ADUs have a floor area not exceeding 1,200 square feet in a single-family residential zone. Therefore, for the purposes of the CalEEMod referenced in technical portions of this Addendum, this analysis assumes that the 400 ADUs would have a total floor area of 480,000 square feet and would be built on 12 acres (480,000 square feet = 12 acres). Furthermore, the 1,332 housing units from the R-40 Overlay Zone would be built upon 91.7 acres consistent with the acreage of the 69 candidate sites. The floor area associated with the 1,332 units was based on the CalEEMod default value, which assumed a floor area of 1,278,720 square feet (Appendix A).
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 15 Table 4 Daily Operational Emissions
Estimated Emissions (lbs/day)
Emissions Source ROG NOX CO SOX PM10 PM2.5
Area 50.8 31.0 111.0 0.2 2.5 2.5
Energy 0.3 5.4 2.3 <0.1 0.4 0.4
Mobile 0.1 <0.1 0.6 <0.005 0.1 <0.1
Project Total 51.1 36.4 114.0 0.2 3.0 2.9
SCAQMD Thresholds 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
See Appendix A for CalEEMod results. Note: Totals may not add up due to rounding. Operational emissions were pulled from Table 2.5 Operations Emissions by Sector, Unmitigated. Daily, Summer (Max) are included as a conservative measure of the proposed Zone Amendment and Reclassification’s predicted emissions.
Source: SCAQMD 2019
Construction and operational impacts with respect to toxic air contaminants (TAC) would not substantially increase compared to those identified in the approved Housing Element Update since the nature of the development would not change under the proposed Zone Amendment and Reclassification. Construction impacts were determined to be less than significant under the approved Housing Element Update and, while activities are anticipated to increase under the proposed Project, construction impacts to health risk are anticipated to remain less than significant.
Due to the nature of the proposed land uses, the proposed Project is not anticipated to result in non-permitted emission sources and, consistent with the approved Housing Element Update, would not represent a risk to existing sensitive receptors from operational activities. Additionally, Measures SC AQ-1 through SC AQ-9 from the approved Housing Element Update would be implemented under the proposed Zone Amendment and Reclassification and would reduce potential exposure of new sensitive receptors to existing TAC sources. Therefore, these mitigation measures would also reduce potential impacts to new sensitive receptors under the proposed Project to less than significant levels.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting the existing air quality. With respect to construction impacts, construction under the proposed Zone Amendment and Reclassification would be consistent with those impacts identified in the approved Housing Element Update; therefore, as with the approved Housing Element Update, the proposed Project is not anticipated to exceed regulatory thresholds for criteria pollutants and therefore would be less than significant.
With respect to operational impacts, the proposed Zone Amendment and Reclassification would be consistent with the AQMP and would not exceed the regulatory thresholds. Therefore, consistent with the approved Housing Element Update, the proposed Zone Amendment and Reclassification would be less than significant.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact with Mitigation (Same as Approved Housing Element Update) City of Pico Rivera
Zone Code Amendments and Zone Reclassification
16 4.4 Biological Resources
Given that the approved Housing Element Update area is a highly disturbed, urban environment, the 2022 IS-MND determined that biological impacts would be less than significant. However, mitigation measures for future housing development will be required due to the City’s proximity to three major open space areas, and the potential impacts on candidate, sensitive, or special status wildlife or plant species through direct or indirect disturbance or elimination of essential habitat. All future housing developments facilitated by the Housing Element Update would also be required to incorporate measures for protecting biological resources from construction-related activities such as vegetation removal and degradation to plant and wildlife habitat.
The approved Housing Element Update would not result in direct housing construction but would facilitate future housing development throughout the City. There are no candidate housing sites proposed within the Whittier Narrows Recreation Area. The nearest candidate housing site is #64, which is about 1.7 miles south of the Whittier Narrows Recreation Area. All future housing development facilitated by the Housing Element Update would be required to demonstrate compliance with federal, State, and local requirements aimed at protecting biological resources.
Additionally, all future housing development facilitated by the Housing Element Update would be required to comply with measures for avoiding and minimizing construction and operations impacts to riparian habitat or other sensitive vegetation communities. The 2022 IS-MND determined that future housing development where the City has determined a potential for impacts to a wildlife corridor, would be required to prepare a site-specific general biological resources survey on sites that contain the presence of any sensitive biological resources. If vegetation clearing would occur during the bird breeding season (February 1 to July 15 for raptors and January 15 to August 31 for other birds), direct impacts to nesting birds could occur. Following compliance with the established regulatory framework, as well identified measures, future housing development would mitigate potential impacts to a less than significant level.
The City regulates roadside and parkway trees to protect biological resources. According to General Plan Environmental Resources Policy 8.6-4, Tree Preservation, the City shall preserve significant native and heritage trees and reduce the loss of these trees through mitigation and replanting programs, when feasible. All future housing development would be subject to the City’s development review process and requirements to demonstrate compliance with General Plan policies and Municipal Code regulations related to the removal or installation of public trees. The City of Pico Rivera is not located within the boundaries of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State habitat conservation plan.
The 2022 IS-MND found that the following measures shall be implemented as standard conditions/conditions of approval for future housing projects:
Measure SC BIO-1: Applications for future housing development facilitated by the Housing Element Update, where the City has determined a potential for impacts to special-status wildlife and plants species, shall be required to comply with the following mitigation framework:
Prior to the issuance of any permit for future development consistent with the Housing Element Update, a site-specific general biological resources survey shall be conducted on sites that contain the presence of any sensitive biological resources, including any sensitive plant or wildlife species. A Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 17 biological resources report shall be submitted to the City to document the results of the biological resources survey. The report shall include (1) the methods used to determine the presence of sensitive biological resources; (2) vegetation mapping of all vegetation communities and/or land cover types; (3) the locations of any sensitive plant or wildlife species; (4) an evaluation of the potential for occurrence of any listed, rare, and narrow endemic species; and (5) an evaluation of the significance of any potential direct or indirect impacts from the proposed project. If
potentially significant impacts to sensitive biological resources are identified, future project-level grading and site plans shall incorporate project design features required by the applicant to minimize direct impacts on sensitive biological resources to the extent feasible, and the report shall also recommend appropriate mitigation to be implemented by the applicant to reduce the impacts to below a level of significance.
Measure SC BIO-2: Applications for future housing development facilitated by the Housing Element Update, where the City has determined a potential for impacts to protected wetlands or other waters of the U.S. and State, shall be required to comply with the following mitigation framework: Prior to issuance of a permit for grading or vegetation removal, future housing development of candidate housing sites wherein the City has determined the potential for impacts to sensitive biological resources, shall be required to prepare a site specific biological resources survey. The limits of any riparian habitats on-site under the sole jurisdiction of CDFW shall be delineated, as well as any special aquatic sites (excluding vernal pools) that may not meet Federal jurisdictional criteria but are regulated by Coastal Commission and the RWQCB.
Measure SC BIO-3: Housing development activities facilitated by the Housing Element Update shall avoid the bird breeding season (typically January through July for raptors and February through August for other avian species), if feasible. If breeding season avoidance is not feasible, the applicant shall be responsible for a qualified biologist to conduct a pre-construction nesting bird survey prior to the commencement of any ground disturbing activities to determine the presence/absence, location, and status of any active nests on or adjacent to the survey area. The extent of the survey buffer area surrounding each site shall be established by the qualified biologist to ensure that direct and indirect effects to nesting birds are avoided. To avoid the destruction of active nests and to protect the reproductive success of birds protected by the Migratory Bird Treaty Act and the California Fish and Game Code and minimize the potential for project delay, nesting bird surveys shall be performed by the qualified biologist prior to project commencement.
In the event that active nests are discovered, a suitable buffer (distance to be determined by the biologist or overriding agencies) shall be established around such active nests, and no construction within the buffer shall allowed until the biologist has determined that the nest(s) is no long ger active (i.e., the nestlings have fledged and are no longer reliant on the nest).
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this City of Pico Rivera
Zone Code Amendments and Zone Reclassification
18 analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Given that the Project area would remain the same for the proposed Zone Amendment and Reclassification, the proposed Project may have an impact on candidate, sensitive, or special status wildlife or plant species through direct or indirect disturbance or elimination of essential habitat. All future housing developments facilitated by the proposed Zone Amendment and Reclassification would also be required to incorporate measures from the approved Housing Element Update for protecting biological resources from constructionrelated activities such as vegetation removal and degradation to plant and wildlife habitat.
Similar to the approved Housing Element Update, there are no candidate housing sites proposed within the Whittier Narrows Recreation Area. The nearest candidate housing site is #64, which is about 1.7 miles south of the Whittier Narrows Recreation Area. Where the City has determined a potential for impacts to a wildlife corridor, would be required to prepare a site-specific general biological resources survey on sites that contain the presence of any sensitive biological resources. future housing development where the City has determined a potential for impacts to a wildlife corridor, would be required to prepare a site-specific general biological resources survey on sites that contain the presence of any sensitive biological resources. If vegetation clearing would occur during the bird breeding season (February 1 to July 15 for raptors and January 15 to August 31 for other birds), direct impacts to nesting birds could occur. Thus, the proposed Zone Amendment and Reclassification would incorporate the measures from the approved Housing Element Update to reduce impacts to sensitive biological resources to a less than significant level.
The proposed Zone Amendment and Reclassification would also be required to comply with the City’s General Plan Policy 8.6-4, Tree Preservation, in order to reduce the loss of trees though mitigation and replanting programs where feasible. Similar to the approved Housing Element Update, the proposed Project is not within the boundaries of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State habitat conservation plan. All future housing development facilitated by the proposed Project would be required to demonstrate compliance with federal, State, and local requirements aimed at protecting biological resources. Following compliance with the established regulatory framework, as well identified measures, future housing development would mitigate potential impacts to a less than significant level.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting biological resources. The proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to biological resources and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant with Mitigation (Same as Approved Housing Element Update) Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 19
4.5 Cultural Resources
The 2022 IS-MND identified 13 buildings and sites with the potential for historical significance. One of the 13 sites, the La Mano building located at 9235 Whittier Boulevard, is on the California Register of Historical Resources. None of the other sites are currently listed on federal, State, or local registers. None of the candidate housing sites are located on the 13 identified, potentially historically significant sites. Nonetheless, future development on candidate housing sites could impact unidentified historical resources; therefore, projects would be required to comply with the established regulatory framework and apply Mitigation Measure SC CR-1 to preclude or mitigate impacts to historical resources.
The 2022 IS-MND determined that future housing development could disturb and potentially destroy subsurface prehistoric/historic archaeological resources or human remains through ground disturbances. All future housing development facilitated by the approved Housing Element Update on candidate housing sites would be subject to the City’s development review process and be required to adhere to all federal, State, and local requirements for avoiding impacts to archeological resources, including General Plan Policies 3.12-3 and 8.7-4, which require consultation with appropriate organizations and individuals to minimize potential impacts to historic and cultural resources and cultural resource surveys for all applicable projects. Mitigation Measures SC CR-2 and SC CR-3 may also be required by City staff. Future housing projects would be required to comply with the established regulatory framework and implement the mitigation program under the 2022 IS-MND to reduce impacts to a less than significant level.
The 2022 IS-MND found that the following measures shall be implemented as standard conditions/conditions of approval for future housing projects:
Measure SC CR-1: Applications for future development facilitated by the Housing Element Update, where the City has determined a potential for impacts to historic resources, shall be required to comply with the following mitigation framework: For any building/structures in excess of 50 years of age having its original structural integrity intact, the applicant shall retain a qualified professional historian to determine whether the affected building/structure is historically significant. The evaluation of historic architectural resources shall be based on criteria such as age, location, context, association with an important person or event, uniqueness, or structural integrity, as indicated in State CEQA Guidelines Section 15064.5. A historical resource report shall be submitted by the applicant to the City and shall include the methods used to determine the presence or absence of historical resources, identify potential impacts from the proposed project, evaluate the significance of any historical resources identified, and measures to avoid or mitigate significant impacts.
Measure SC CR-2: Applications for future development consistent with the Housing Element Update, where the City has determined a potential for impacts to archeological resources, shall be required to comply with the following mitigation framework: Prior to the issuance of any permit for future development located on a previously undisturbed site, the applicant shall retain a qualified archaeologist to conduct an archaeological survey to evaluate the presence of cultural resources and the need for project impact mitigation by preservation, relocation, or other methods. An archaeological resource report shall be submitted by the applicant to the City and shall City of Pico Rivera
Zone Code Amendments and Zone Reclassification
20 include the methods used to determine the presence or absence of archaeological resources, identify potential impacts from the proposed project, and evaluate the significance of any archaeological resources identified. If there are potentially significant impacts to an identified archaeological/cultural resource, the report shall also recommend appropriate mitigation required by the applicant to reduce impacts to below a level of significance.
Measure SC CR-3: If currently unknown resources are discovered during grading or demolition, such activity shall be halted or diverted away from the affected area of the project site, until a qualified archaeologist can examine the archaeological resources to determine their significance. If the find(s) are determined to be significant, the archaeologist shall provide recommendations regarding the collection, documentation, and disposition of the archaeological resources and shall provide recommendations on whether the remainder of the site that has not yet been disturbed should be monitored
The 2022 IS-MND analyzes the buildout of 1,332 units over 69 candidate housing sites but does not analyze the buildout of an additonal 400 ADUs. The proposed Zone Amendment and Reclassification does not change the number or location of any housing opportunity sites in the city. The proposed Project would accommodate up to 1,732 total future residential units which includes a 30 percent buffer and 400 ADUs. Under the proposed Zone Amendment and Reclassification , owners and developers may utilize the R-40 Zoning Overlay in order to increase housing density to 40 units per acre and encourage the development of low-income housing. Similar to the approved Housing Element Update area, the area for the proposed Project includes previously disturbed, urbanized developments. One of the 69 candidate housing sites is currently vacant, while the remaining 68 candidate housing sites contain existing development.
Similar to the approved Housing Element Update, none of the candidate housing sites under the proposed Project are located on the 13 identified, potentially historically significant sites. The likelihood of encountering archeological resources is greatest on undeveloped sites that have been minimally disturbed in the past (e.g., undeveloped parcels, vacant lots, and lots containing undeveloped areas), while previously disturbed sites are generally considered to have a lower potential for archeological resources since previous construction activities may have already removed or disturbed soil that may have contained resources. Notwithstanding, future housing development could disturb and potentially destroy subsurface prehistoric/historic archaeological resources through ground disturbances. For this reason, development projects under the proposed Zone Amendment and Reclassification would be required to comply with the established regulatory framework and implement Mitigation Measure SC CR-2.
There are no known burial sites or cemeteries in the City. Therefore, it is not anticipated that human remains would be present in the City outside formal cemeteries. However, human remains could be disturbed as a result of future development facilitated by the Housing Element Update. If human remains are found, those remains would require proper treatment in accordance with applicable laws, including State of California Health and Safety Code (HSC) Sections 7050.5 through 7055 and PRC Section 5097.98 and Section 5097.99. HSC Sections 7050.5 through 7055 describe the general provisions for treatment of human remains. In addition, development under the proposed Project would be required to comply with the established regulatory framework and implement Mitigation Measure SC CR-3, as needed, in order to reduce impacts to cultural resources.
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 21 Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting cultural resources. Overall, the proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to historic and archaeological resources and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact with Mitigation (Same as Approved Housing Element Update)
4.6 Energy
The 2022 IS-MND determined that it is expected that construction fuel consumption associated under the Housing Element Update would not be any more inefficient, wasteful, or unnecessary than other similar projects of this nature. Future development facilitated by the approved Housing Element Update would consume energy during operations through building electricity, water, and natural gas usage, as well as fuel usage from on-road vehicles. Future housing development must also comply with Mitigation Measure SC ENE-1, which requires the integration of energy conservation practices into new development projects, and all other applicable energy efficiency policies, such as CALGreen and the most current Building Energy Efficiency Standards. Therefore, implementation of the approved Housing Element Update would result in a less than significant impact on transportation‐related energy uses and would not result in a wasteful, inefficient, or unnecessary consumption of energy resources.
Future housing developments would be reviewed for consistency with City policies related to renewable energy and energy efficiency, and with all Federal and State energy regulations, such as the California Energy Code Building Energy Efficiency Standards (CCR Title 24, Part 6), the CALGreen Code (CCR Title 24, Part 11), and Senate Bill (SB) 743 transportation-related impact analysis requirements. Future housing development would also be required to comply with Mitigation Measure SC ENE-2, which requires the applicant to comply with all requirements of Southern California Edison and to obtain all required permits. Therefore, compliance with the existing regulatory setting and City requirements would reduce impacts to a less than significant level.
The2022 IS-MND found that the following measures shall be implemented as standard conditions/conditions of approval for future housing projects:
Measure SC ENE-1: Applicant to incorporate energy conservation practices into the project.
These may include:
i. Use of energy efficient or gas air conditioning systems and appliances. ii. Low wattage or LED lighting, long-life bulbs, sensors to automatically turn off/on outdoor lighting, lights with dimmers, etc. iii. Adequate insulation.
iv. Clean-burning or energy-efficient water heaters.
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
22 v. Solar energy, if feasible.
Measure SC ENE-2: The applicant shall comply with all requirements of Southern California Edison and obtain all required permits.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. The City of Pico Rivera receives electricity from Pico Rivera Innovative Municipal Energy (PRIME) through Southern California Edison (SCE). In 2021, the most recent year with available data, SCE’s electricity generation and distribution infrastructure delivered approximately 29,735 giga-watt hours (GWh) of electricity to its residential customers (California Energy Commission [CEC] 2021a). The proposed Zone Amendment and Reclassification would result in approximately 6.4 GWh per year with respect to electricity (Appendix A). The proposed Project would utilize approximately 0.02 percent of SCE’s total supply. In addition, similar to the approved Housing Element Update, the proposed Project would implement Mitigation Measures SC ENE-1 and ENE-2.
Natural gas is provided to the City by Southern California Gas Company (SoCalGas). In 2020, a total of approximately 2,261 million therms of natural gas were consumed by SoCalGas’ residential customers (CEC 2021b). The proposed Project would result in approximately 229,275 therms of natural gas consumption per year. Development facilitated by the proposed Zone Amendment and Reclassification would utilize approximately 0.01 percent of SoCalGas supplies.
Similar to the approved Housing Element Update, all future housing development facilitated by the proposed Project would be subject to the City’s development review process and required to adhere to all federal, State, and local requirements for energy efficiency. This includes SB 32’s Scoping Plan that requires a 50 percent reduction in petroleum use in vehicles; SCAG’s 2020-2045 RTP/SCS, which calls for the support of land use and transportation planning strategies that reduce energy use and GHG emissions, the latest Title 24 standards, and applicable goals and policies under the City’s General Plan. In addition, the t design and materials for future developments would be subject to compliance with the most current Building Energy Efficiency Standards. Prior to issuance of a building permit, the City would review and verify that the individual project plans demonstrate compliance with the current version of the Building and Energy Efficiency Standards. Individual projects would also be required adhere to the provisions of CALGreen, which establishes planning and design standards for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants. Upon compliance with all applicable standards and requirements, along with implementation of Mitigation Measures SC ENE-1 and ENE-2, future housing development under the proposed Project would result in a less than significant impact on transportation‐related energy uses and would not result in a wasteful, inefficient, or unnecessary consumption of energy resources.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting energy. Potential energy impacts would be less than significant and would be consistent with the 2022 IS-MND and approved Housing Element Update.
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 23 Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact with Mitigation (Same as Approved Housing Element Update)
4.7 Geology and Soils
The 2022 IS-MND determined that implementation of the Housing Element Update would not result in impacts relating to rupture of a known earthquake fault, liquefaction, landslides, and soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems, and would result in less-than-significant impacts relating to seismic ground shaking, unstable soils, and expansive soils (Section 4.7, Geology and Soils, of the 2022 IS-MND). There are no known earthquake faults that traverse the City. In addition, all development facilitated under the Housing Element Update would be subject to the City’s development review process and adherence to all federal, State, and local requirements for avoiding and minimizing seismic-related impacts.
The 2022 IS-MND determined that while the potential for differential settlement, landslides, and seiches exist within the City, given soil, topographic and other conditions, their likelihood, and potential severity are generally limited. All future housing development facilitated by the Housing Element Update would be subject to the City’s development review process and be required to adhere to all local, State, and federal requirements for avoiding and minimizing seismic-related impacts. In addition, future housing development facilitated by the Housing Element Update would not create substantial risks to life or property associated with unstable and expansive soils.
Regarding septic tanks, housing developed through the approved Housing Element Update would be in areas currently served by the City’s sanitary sewer system and would not use septic tanks or other alternative wastewater disposal systems. Regarding paleontological resources, General Plan Environmental Resources Element Policy 8.7-4 requires that new development necessitating discretionary approval that could potentially impact paleontological resources to conduct a resource survey to ensure that potential sites are identified for avoidance or special treatment. Therefore, the overall impacts associated with geology and soils under the approved Housing Element Update were determined to be less than significant and mitigation would not be required.
There are no known earthquake faults that traverse the City. In addition, all development facilitated under the proposed Project would be subject to the City’s development review process and adherence to all federal, State, and local requirements for avoiding and minimizing seismic-related impacts. Similar to the approved Housing Element Update, adherence with statewide National Pollutant Discharge Elimination System (NPDES) Construction General Permit construction requirements would ensure erosion would not occur onsite through implementation of erosion and sediment control best management practices (BMP) during construction of individual projects under the proposed Project. Therefore, impacts regarding seismicity and soil erosion would be less than significant. Similarly, given the same number and location of candidate housing sites as the approved Housing Element Update, potential impacts associated with septic tanks and paleontological resources under the proposed Project would be less than significant.
All future housing development facilitated by the proposed Zone Amendment and Reclassification would be subject to the City’s development review process, and adherence to all federal, State, and City of Pico Rivera
Zone Code Amendments and Zone Reclassification
24 local requirements for avoiding and minimizing impacts concerning soil erosion or loss of topsoil, including the City’s Grading and Excavation Code (Municipal Code Section 15.08.220), which establishes minimum requirements for grading, excavating and filling of land, and provides for the issuance of permits. Construction-related erosion would be addressed through compliance with the NPDES program, which requires implementation of a Storm Water Pollution Prevention Plan (SWPPP) and BMPs intended to reduce soil erosion. Impacts would remain less than significant.
All future housing development facilitated by the proposed Zone Amendment and Reclassification would be subject to the City’s development review process, and adherence to all federal, State, and local requirements, including the City’s Building Code (Municipal Code Chapter 15.08), and the City’s Grading and Excavation Code (Municipal Code Section 15.08.220), which require sets of plans and specifications, a Soils Engineering Report, and an Engineering Geology Report before issuance of grading permits (Municipal Code Section 15.08.220). Therefore, future housing development would not create substantial adverse risks to life or property associated with liquefaction and impacts would be less than significant.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting geology and soils. As a result, development of the proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to geology, soils, and seismicity, and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact (Same as Approved Housing Element Update)
4.8 Greenhouse Gas Emissions
The 2022 IS-MND determined that future housing development facilitated by the approved Housing Element Update would have a less than significant impact on GHG emissions. The approved Housing Element Update does not include the rezoning of any parcels. Thus, future growth and development facilitated by the approved Housing Element Update would have been accounted for in the General Plan EIR and SCAG RTP. The approved Housing Element Update, and future development facilitated by the Housing Element Update, would not conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing GHG emissions. Impacts would be less than significant.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project.
SCAG’s RTP/SCS includes a commitment to reduce emissions from transportation sources by promoting compact and infill development to comply with SB 375. Consistent with the approved Housing Element Update, the proposed Zone Amendment and Reclassification would implement many of the SCAG policies related to high-density, infill development that are focused on public Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 25 transit opportunities, and would involve the revitalization of an already developed urban area with infill development that would make use of the existing circulation and utility infrastructure. The proposed Project would also introduce high density residential uses, thus creating a mixed-use environment in which residents would benefit from nearby shopping and employment opportunities. Future development would be within walking distance of the varying modes of public transportation, which would encourage the use of public transportation and reduce GHG emissions.
Similar to the approved Housing Element Update, the proposed Zone Amendment and Reclassification is consistent with the General Plan. The proposed Project would amend some General Plan land uses and zoning designations of parcels to implement the approved Housing Element Update. As a result, the City would coordinate with SCAG to adjust the City’s households forecast in future updates to the RTP/SCS. Overall, the proposed Project would not result in a conflict with the General Plan because it is generally consistent with the goals and policies of the General Plan that aim at enhancing Pico Rivera by introducing mixed uses and creating a pedestrianfriendly environment.
There are numerous State plans, policies, and regulations adopted for the purpose of reducing GHG emissions. The principal State plan and policy is AB 32, the California Global Warming Solutions Act of 2006, as well as SB 32. The quantitative goal of AB 32 is to reduce GHG emissions to 1990 levels by 2020 and the goal of SB 32 is to reduce GHG emissions to 40 percent below 1990 levels by 2030.
The 2022 Scoping Plan Update identifies plans and regulations and strategies that are to be implemented at the State and project level that will reduce GHG emissions consistent with State policies. The proposed Zone Amendments and Reclassification would be required to include all mandatory green building measures for new developments under the CALGreen Code. Therefore, the proposed Project would be consistent with the Scoping Plan measures through incorporation of these stricter building and appliance standards. The proposed Project’s GHG emission were also quantitatively analyzed and are provided in this analysis for informational purposes.
Amortized over a 30-year period pursuant to SCAQMD guidance, construction associated with the project would generate approximately 648 MT CO2e per year. As shown in Table 5, annual average operational GHG emissions for the proposed Project would be approximately 4,477 MTCO2e.
Table 5 Annual Emissions
Emissions Source Project Emissions
Construction 648.4
Operational
Area 464.0
Energy 2,688.0
Mobile 27.6
Waste 501.0
Water 146.0
Refrigeration 2.1
Total Proposed Project 4,477.1
See Appendix A for CalEEMod results.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project City of Pico Rivera
Zone Code Amendments and Zone Reclassification
26 would not result in a new significant impact affecting GHGs. As a result, implementation of the proposed Zone Amendment and Reclassification would not generate GHG emissions that would be significant, and impacts would be consistent with the approved Housing Element Update.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact (Same as Approved Housing Element Update)
4.9 Hazards and Hazardous Materials
The 2022 IS-MND determined that hazards and hazardous materials impacts from implementation of the approved Housing Element Update would be less than significant with mitigation incorporated. It was determined that impacts associated with the transport, use, or disposal of hazardous materials would be less than significant following compliance with the established regulatory framework. Potential impacts involving the accidental discovery of unknown wastes or suspect materials during construction would also be less than significant following compliance with the established regulatory framework. If a project is located within 0.25 miles of an existing or proposed school, adherence to California Hazardous Waste Control Law, California Health and Safety Code, and Resource Conservation and Recovery Act (RCRA) regulations would reduce potential impacts associated with the accidental release of hazardous materials.
Given the scope and location of the future housing development facilitated by the Housing Element Update, potential impacts associated with impairment or conflicts with implementation of emergency response plans would be less than significant. In addition, it was determined that there would be no impact to airports as there are no airports in Pico Rivera, and there would be no impacts in regard to exposure to wildfire resulting in a significant risk of loss, injury or death as the approved Housing Element Update area is fully urbanized, not adjacent to any wildland, and is located in a Non-Very High Fire Hazard Severity Zone.
However, the 2022 IS-MND discloses that the DTSC Envirostor database and State Water Resources Control Board Geo Tracker database identified 13 regulated facilities and 76 regulated facilities in the City, respectively. Future housing development facilitated by the approved Housing Element Update could occur near identified regulated facilities. Therefore, Mitigation Measure SC HAZ-1 was identified to ensure that any potential discovery of unknown wastes or suspect materials during construction that are believed to involve hazardous waste or materials are properly handled to reduce any hazards to the public or the environment. Upon implementation of this measure, potential impacts were found to be mitigated to a less than significant level.
The2022 IS-MND found that the following measures shall be implemented as standard conditions/conditions of approval for future housing project:
Measure SC HAZ-1: If the Applicant or Applicant’s contractor discovers unknown wastes or suspect materials during construction that are believed to involve hazardous waste or materials, the applicant or applicant’s contractor shall:
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 27
1. Immediately cease work in the suspected contaminant’s vicinity, remove workers and the public from the area, and secure the area.
2. Notify the applicant’s Environmental Professional and immediately implement proper remedial activities as recommended.
3. Notify the City Engineer and Planning Division Director and implement measures to further secure the area.
4. The Hazardous Waste/Materials Coordinator shall advise the responsible party of further actions that shall be taken, if required.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Small quantities of hazardous materials would be anticipated, including cleaning solvents, fertilizers, pesticides, and other materials used in regular maintenance. On the local level, the Los Angeles County Fire Department routinely provides inspections to ensure the safe storage, management, and disposal of any hazardous materials in accordance with the federal, State, and local regulations. Potential impacts involving the accidental discovery of unknown wastes or suspect materials during construction would be less than significant upon compliance with the established regulatory framework. If a project is located within 0.25 miles of an existing or proposed school, adherence to California Hazardous Waste Control Law, California Health and Safety Code, and Resource Conservation and Recovery Act (RCRA) regulations would reduce potential impacts associated with the accidental release of hazardous materials.
Similar to the approved Housing Element Update, it is not anticipated that implementation of the proposed Zone Amendment and Reclassification would impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan. Future housing development facilitated by the proposed Project would be subject to the City’s development review process and compliance with 2019 California Fire Code Chapter 503, Fire Apparatus Access Roads, which specifies how fire access roads are required to be designed for new developments. Impacts to emergency response plans or emergency evacuation plans would be less than significant. In addition, similar to the approved Housing Element Update, the proposed Project is located in a NonVery High Fire Hazard Severity Zone and would not expose people or structures to significant risk, injury, or death involving wildland fires.
Since all candidate housing sites are the same for the proposed Zone Amendment and Reclassification, future housing development facilitated by the proposed Project could occur near identified regulated facilities. Therefore, the proposed Zone Amendment and Reclassification would be required to incorporate Measure SC HAZ-1 from the 2022 IS-MND in order to reduce any hazards to the public or the environment.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact associated with hazards and hazardous materials. Thus, the proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to hazards and hazardous materials and would be consistent with the impact analysis provided in the 2022 IS-MND.
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
28 Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact with Mitigation (Same as Approved Housing Element Update)
4.10 Hydrology and Water Quality
The 2022 IS-MND determined that hydrology and water quality impacts from implementation of the approved Housing Element Update would be less than significant. Construction and operation of future development under the implementation of the approved Housing Element Update could result in discharges of hazardous materials, sediment, and stormwater that could contaminate downstream waters. Compliance with required laws, permits, ordinances, and plans, including but not limited to Low Impact Development (LID) and Construction General Permit requirements would reduce impacts to hydrology and water quality to a less-than-significant level. However, all housing opportunity sites are developed except for one, which would increase impervious surfaces and offsite runoff that would have the potential to degrade surface or groundwater quality. To minimize this impact, future housing development facilitated by the Housing Element Update would be subject to the City’s development review process, and requirements to install, implement, and maintain the BMPs identified in Municipal Code Section 16.04.110 and SC HYD-1 including, but not limited to materials storage; inspection, maintenance, and upgrade of BMPs, and the preparation of Standard Urban Stormwater Mitigation Programs (SUSMP). All new development would also be required to comply with existing water quality standards and waste discharge regulations set forth by the State Water Resources Control Board (SWRCB). Future developments facilitated by the Housing Element Update would comply with these regulations and waste discharges would be connected to the public wastewater system.
The 2022 IS-MND found that the following measure shall be implemented as a standard condition/condition of approval for future housing projects:
Measure SC HYD-1: The applicant shall implement various Best Management Practices (BMPs) during the construction process in order to control and filter potential stormwater runoff that may accumulate during the project’s construction.
These construction BMPs shall include the following:
Runoff, sediment, and construction debris shall not leave the site and enter the storm drain system.
Any sediment or other materials which are tracked off-site shall be removed the same day as they are tracked off-site. Where determined necessary by the authorized enforcement officer, a temporary sediment barrier shall be installed.
Drainage controls to prevent runoff from leaving the site shall be utilized as needed, depending on the topography of the site and extent of proposed grading. These controls may include but are not limited to the following: the detention ponds, sediment ponds, or infiltration pits; the installation of dikes, filer berms, or ditches; and the installation of down drains, chutes or flumes.
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 29 Plastic covering may be utilized to prevent erosion of an otherwise unprotected area, along with runoff devices to intercept and safely convey the runoff.
Excavated soil shall be located on the site in a manner that eliminates the possibility of sediments running off-site. Soil piles shall be covered until the soil is either used or removed.
No runoff from washing construction or other industrial vehicles on site shall be permitted to leave the site or enter the storm drain system. The City may, as a condition of granting a construction permit, set reasonable limits on the clearing of vegetation from construction sites, including but not limited to regulating the length of time during which soil may be bare and, in certain sensitive cases, prohibit bare soil.
The 2022 IS-MND analyzes the buildout of 1,332 units over 69 candidate housing sites but does not analyze the buildout of an additonal 400 ADUs. The proposed Zone Amendment and Reclassification does not change the number or location of any candidate housing sites in the city. The proposed Project would accommodate up to 1,732 total future residential units which includes a 30 percent buffer and 400 ADUs. Under the proposed Project, owners and developers may utilize the R-40 Zoning Overlay in order to increase housing density to 40 units per acre and encourage the development of low-income housing.
Similar to the approved Housing Element Update, if future developments disturb more than one acre of land surface, they would be required to obtain coverage under the NPDES storm water program. The NPDES Construction General Permit program calls for the implementation of BMPs to reduce or prevent pollutant discharge from these activities to the Maximum Extent Practicable for urban runoff and to meet the Best Available Technology Economically Achievable and Best Conventional Pollutant Control Technology standards for construction storm water. Construction activities would be required to comply with a Project-specific SWPPP that identifies erosion-control and sediment-control BMPs that would meet or exceed measures required by the Construction Activity General Permit to control potential construction-related pollutants. Additionally, the proposed Zone Amendment and Reclassification would be subject to the City’s development review process, and requirements to install, implement, and maintain the BMPs identified in Municipal Code Chapter 16.04 and Measure SC HYD-1 from the 2022 IS-MND in order to reduce construction and operational impacts to run off.
Implementation of the proposed Zone Amendments and Reclassification would not substantially alter drainage patterns or expose additional residents to flood-related hazards. Future housing development facilitated by the proposed Project would be subject to the City’s development review process and adherence to all federal, State, and local requirements for avoiding construction and operations impacts that could substantially alter the existing drainage pattern or alter the course of a stream or river, including the City’s Municipal Code and Measure SC HYD-1 from the 2022 IS-MND.
Similarly, the proposed Project would be required to comply with the City’s Urban Water Management Plan, Municipal Code standards, and SC HYD-1. As a result, future housing development facilitated by the proposed Project would not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting hydrology and water quality. Overall, the City of Pico Rivera
Zone Code Amendments and Zone Reclassification
30 proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to hydrology and flooding and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact with Mitigation (Same as Approved Housing Element Update)
4.11 Land Use Planning
The 2022 IS-MND determined that the approved Housing Element Update does not include infrastructure improvements that would bisect existing established communities. Out of the 69 candidate housing sites, 68 are developed in urban areas and would be considered in-fill developments. Further, candidate housing sites have been identified throughout the City, rather than concentrated in a single area, and therefore, would not divide an established community.
Future housing development facilitated by the approved Housing Element Update would be subject to the City’s development review process, and requirements to comply with applicable federal, State, and local laws and local policies and regulations, as applicable to new housing development.
As such, the approved Housing Element Update would be consistent with applicable land use and planning policies in the State, regional, and local context as necessary to meet that legislation. Land use impacts were found to be less than significant under the approved Housing Element Update.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Similar to the approved Housing Element Update, the proposed Project would not divide an established community. The candidate housing sites would remain to be considered as infill development that would be spread throughout the City rather than concentrated in a single area.
The proposed Zone Amendment and Reclassification would not result in direct housing construction but would facilitate future housing development as market conditions allow and at the discretion of the owners. In addition, the proposed Project would provide the option to owners and developers to utilize the R-40 Zoning Overlay to produce low-income housing in higher densities on the candidate housing sites. Future housing development facilitated by the proposed Project would be subject to the City’s development review process, and requirements to comply with applicable federal, State, and local laws and local policies and regulations, as applicable to new housing development. As such, the proposed Zone Amendment and Reclassification would be consistent with applicable land use and planning policies in the State, regional, and local context as necessary to meet that legislation.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting land use and planning. The proposed Project Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 31 would not introduce new impacts or substantially increased impacts related to land use and planning, and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact (Same as Approved Housing Element Update)
4.12 Mineral Resources
The area analyzed under the 2022 IS-MND consists of developed urban land. The Surface Mining and Reclamation Act of 1975 (SMARA) requires classification of land into mineral resource zones (MRZs) according to the area’s known or inferred mineral potential. The City is not located in an area identified as a locally important mineral resource recovery site. Further, the General Plan does not identify any part of the City as a locally important mineral resource recovery site. Therefore, the approved Housing Element Update would have no impact concerning mineral resources and no mitigation is required.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Similar to the approved Housing Element Update, the proposed Project would not be implemented in an area identified as a locally important mineral recovery site. In addition, the City’s General Plan does not identify any part of the City as a locally important mineral resource recovery site.
Although the proposed Project analyzes the additional 400 ADUs in comparison to the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting mineral resources. As a result, the proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to mineral resources and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact (Same as Approved Housing Element Update)
4.13 Noise
The 2022 IS-MND determined that noise and vibration-related impacts from new development under the approved Housing Element Update could be divided into construction impacts and operational impacts (see Section 4.13, Noise, of the 2022 IS-MND). New development would comply City of Pico Rivera
Zone Code Amendments and Zone Reclassification
32 with the City’s existing noise standards and daytime construction hours permitted by the City’s Municipal Code. Standard Conditions/Conditions of Approval have been identified for constructionrelated activities, including but not limited to preparation of a Noise Mitigation Plan; identification of a noise disturbance coordinator and provide a hotline number to allow community members to voice any noise complaints resulting from construction activities; and BMPs that applicants must comply with during construction to reduce noise impacts from the construction of housing developments. Future housing development facilitated by the approved Housing Element Update would result in additional housing, people, pets, and automobiles in the City. Noise would be generated by stationary operation-related sources, such as heating, ventilation, and air conditioning (HVAC) units, generators, lawn maintenance equipment, and swimming pool pumps.
All future housing development would be subject to the City’s development review process, compliance with Municipal Code standards, and adherence to the mitigation measures identified under the 2022 IS-MND (listed below). Therefore, upon compliance with applicable regulations and implementation of the applicable measures, construction and operation noise impacts would be mitigated to a less than significant level.
Similarly, construction facilitated by the approved Housing Element Update could adversely impact buildings located near construction sites depending on soil type, ground strata, and construction characteristics of the receiver buildings. To further lessen the potential vibration-related impacts to historic resources and sensitive uses (i.e., nonengineered timber and masonry buildings), the 2022 IS-MND includes measures related to the location and use of equipment. Alternative installation methods could reduce vibration impacts below the 0.2 inch/second threshold. Residential uses would not be anticipated to generate excessive groundborne vibration. Therefore, impacts related to groundborne vibration from construction or operation of the approved Housing Element Update would be mitigated to a less than significant level.
There would be no impacts regarding airport noise, as the nearest airport to the approved Housing Element Update area is the Long Beach Airport located approximately 15 miles south. The City of Pico Rivera is not within the Airport’s influence area and thus, no impact would occur.
The 2022 IS-MND found that the following measures shall be implemented as standard conditions/conditions of approval for future housing projects:
Measure SC NOI-1: The City shall consider all future developments to ensure their compliance with Policies 11.1-1 through 11.2-6 in the Noise Element of the General Plan Update and determine if operational noise levels generated by the development would exceed the City’s permissible noise standards for transportation and stationary noise sources established in the Noise Element.
If City noise standards would be exceeded, design measures shall be taken to ensure that operational noise levels would be reduced to levels that comply with the permissible City noise standards to the extent feasible. These measures may include, but are not limited to, the erection of noise walls, use of landscaping, and/or the design of adequate setback distances for the new developments.
Measure SC NOI-2: Concurrent with submittal of a project application at any of the Housing Opportunity locations, the project proponent shall submit a noise study to evaluate existing and projected noise levels that could affect residences within the project sites to assure that exterior and interior noise levels meet City noise standards. If noise standards are exceeded, measures to attenuate noise levels shall be required to attenuate noise to levels that in accordance Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 33 with City standards. Noise studies shall be prepared to the satisfaction of the City’s Community Development Director.
Measure SC NOI-3: All dwelling units shall maintain interior noise levels that do not exceed 45 dBA, when all windows and doors are closed.
Measure SC NOI-4: All construction activities shall take place only between the hours of 7:00 a.m. and 7:00 p.m. in compliance with Policies 11.3-1 and 11.3-2 in the Noise Element of the General Plan.
Measure SC NOI-5: Applicant shall submit a Noise Mitigation Plan to the Community and Economic Development – Planning Division for review and approval. The Plan shall depict the location of construction equipment storage and maintenance areas, and document methods to be employed to minimize noise impacts on adjacent noise sensitive land uses.
Measure SC NOI-6: During the construction phase, the applicant shall designate a noise disturbance coordinator who will be responsible for responding to neighborhood complaints about construction noise by determining the cause of the noise complaints and require implementation of reasonable measures to correct the problem. The noise disturbance coordinator and their responsibilities shall be identified and reflected within the Noise Mitigation Plan. The coordinator’s telephone number(s) shall be prominently displayed at construction locations.
Measure SC NOI-7: The applicant shall be responsible for providing a hotline number that adjacent residents or businesses may call with concerns or questions regarding construction activities. The hotline number shall be made available 24 hours a day, 7 days a week and shall be answered with a live person.
Applicant shall install and maintain a temporary construction sign displaying the hotline number within the project site during the construction phase. A site plan and to-scale elevations of the temporary construction sign shall be submitted to the Community and Economic Development Department – Planning Division for review and approval, prior to installation. The hotline number and its operation details shall be identified and reflected within the Noise Mitigation Plan.
Measure SC NOI-8: All construction equipment shall utilize noise reduction features (e.g., mufflers and engine shrouds) that are no less effective than those originally installed by the manufacturer.
Measure SC NOI-9: Approval of development permits shall ensure that the operation of jackhammers shall be prohibited within 25 feet of existing residential structures and 20 feet of institutional structures during construction activities associated with any project-specific development, to the extent feasible.
Measure SC NOI-10: The City shall require a preconstruction meeting with the City’s job inspector(s) and the general contractor or onsite project manager to confirm that noise and vibration mitigation and practices (including construction hours, sound mufflers on equipment, neighborhood notification, posted signs, etc.) are implemented.
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
34 Measure SC NOI-11: The City shall ensure that stationary construction noise sources be located as far from adjacent receptors as possible, and they shall be muffled and enclosed within temporary sheds, incorporate insulation barriers, or other measures to the extent feasible. Construction equipment staging and storage areas shall be located as far from nearby residential uses as possible. The City shall ensure that project approvals require that construction activities whose specific location on a construction site may be flexible (e.g., operation of compressors and generators, cement mixing, general truck idling) be conducted as far as possible from the nearest noise-sensitive land uses.
Measure SC NOI-12: During the construction phase, prohibit and post signs prohibiting unnecessary idling of internal combustion engines.
Measure SC NOI-13: During the construction phase, utilize “quiet” air compressors and other stationary equipment where feasible and available.
Measure SC NOI-14: All haul truck deliveries shall be subject to the same hours specified for construction. A haul truck route plan shall be provided to the Public Works Department for review and approval, prior to the commencement of any construction activities. The plan shall denote any construction traffic haul routes where heavy trucks would exceed 100 daily trips (counting those both to and from the construction site). To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings.
Measure SC NOI-15: Approval of development permits shall ensure that where a new development would be constructed adjacent to an existing historic building, the project developer shall require by contract specifications that a certified structural engineer be retained to submit evidence that the operation of vibration-generating equipment associated with the new development would not result in any structural damage to the adjacent historic building. Contract specifications shall be included in the construction documents for the new development, which shall be reviewed by the City prior to issuance of a construction permit.
Measure SC NOI-16: The City shall require that all construction truck traffic be restricted to routes approved by the City of Pico Rivera, which shall avoid residential areas and other sensitive receptors to the extent feasible.
Measure SC NOI-17: To avoid impacts to vibration-sensitive structures (i.e., non-engineered timber and masonry buildings) located within a 50-foot radius of pile driving activities, prior to demolition, grading, or building permit approval, the applicant shall provide for the following measures to be specified on the project plans and implemented prior to and during construction:
Construction equipment that generates high levels of vibration, such as large bulldozers, loaded trucks, and caisson drills, shall be prohibited within 45 feet of residential structures and 35 feet of institutional structures during construction of any project-specific development to the extent feasible. Small, rubber-tired construction equipment shall be used within this area during demolition and/or grading operations to reduce vibration effects, where feasible.
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 35 The applicant shall utilize temporary noise attenuation curtain suitable for pile driving equipment as needed. This noise attenuation device should be installed directly between the equipment and the nearest noise sensitive receptor to the construction site.
Pile driving within a 50-foot radius of identified vibration-sensitive structures shall utilize alternative installation methods (e.g., pile cushioning, jetting, predrilling, castin-place systems, resonance-free vibratory pile drivers) such that vibration velocities from the alternative construction activity would fall below the 0.2 the inch/second threshold.
Construction hours, allowable workdays, and the phone number of the job superintendent shall be clearly posted at all construction entrances to allow for surrounding owners and residents to contact the job superintendent. If the City or the job superintendent receives a complaint, the superintendent shall investigate, take appropriate corrective action, and report the action taken to the reporting party.
Measure SC NOI-18: Approval of development permits shall ensure that individual developments minimize noise impacts from mechanical equipment, such as ventilation and air conditioning units, by locating equipment away from receptor areas, installing proper acoustical shielding for the equipment, and incorporating the use of parapets into building design to ensure that noise levels shall not exceed the noise level standards for stationary noise sources in the Noise Element of the General Plan Update.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Similar to the approved Housing Element Update, the proposed Project would induce construction equipment such as backhoes, excavators, graders, loaders, compactors, cranes, trucks, pavers, pneumatic tools, generator sets, and air compressors.
As shown in Table 4.13-1 of the 2022 IS-MND, typical construction equipment can range from 77 to 90 dBA to a person or structure located 50 feet from the noise source. Similar to the approved Housing Element Update, the proposed Zone Amendment and Reclassification would be required to incorporate the mitigation measures, listed above, in order to reduce impacts related to construction noise to a less than significant level. Future housing development facilitated by the proposed Project would result in additional housing, people, pets, and automobiles in the City.
Noise would be generated by stationary operation-related sources, such as heating, ventilation, and air conditioning (HVAC) units, generators, lawn maintenance equipment, and swimming pool pumps. The proposed Project would require adherence to the mitigation measures identified under the 2022 IS-MND to reduce operational noise impacts from the Project. In addition, the proposed Zone Amendment and Reclassification would be subject to the City’s development review process and compliance with the Municipal Code standards regarding construction and operational noise.
Construction activities associated with future housing development facilitated by the proposed Zone Amendment and Reclassification could result in varying degrees of groundborne vibration impacts from heavy equipment operations, depending on the construction procedure and equipment used.
Construction equipment operations would generate vibrations that spread through the ground and diminish in amplitude with distance from the source. The effect on buildings located near a construction site often varies depending on soil type, ground strata, and construction characteristics City of Pico Rivera
Zone Code Amendments and Zone Reclassification
36 of the receiver building(s). The FTA architectural damage criterion for continuous vibrations (i.e., 0.2 inch/second) appears to be conservative even for sustained pile driving. Pile driving levels often exceed 0.2 inch/second at distances of 50 feet, and 0.5 inch/second at 25 feet without any apparent damage to buildings. Types of construction vibration impacts include human annoyance and building damage. As shown in Table 4.13-2 of the 2022 IS-MND, groundborne vibration peak particle velocity from 25 feet away can range from 0.003 inches per second to 0.210 inches per second for typical standard equipment. Similar to the approved Housing Element Update, the proposed Project would include the mitigation measures presented in the 2022 IS-MND to further lessen the potential vibration-related impacts to historic resources and sensitive uses. Residential uses would not be anticipated to generate excessive groundborne vibration. Future housing development facilitated by the proposed Project would not involve railroads or substantial heavy truck operations, and therefore would not result in vibration impacts at surrounding uses.
New development under the proposed Zone Amendment and Reclassification would be exposed to intermittent noise levels from aircraft overflights, similar to buildout under the approved Housing Element Update. However, the proposed Project area is not located within an airport’s noise contours and development would not impact air traffic patterns. The nearest airport is Long Beach Airport located approximately 15 miles south of the proposed Project area. Therefore, similar to the approved Housing Element Update, no noise impacts related to exposure of aircraft operations would occur under the proposed Zone Amendment and Reclassification.
Compliance with existing State regulations, approved Housing Element Update mitigation measures, regulations, and policies relating to noise, and requirements included in the City’s Municipal Code would collectively reduce noise impacts associated with the proposed Project. Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting noise. As a result, development under the proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to noise and vibration and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant with Mitigation (Same as Approved Housing Element Update)
4.14 Population and Housing
The 2022 IS-MND determined that the project would exceed SCAG’s population project of 67,400 by 2045. Future housing development facilitated by the approved Housing Element Update would result in population growth of approximately 4,942 persons. However, SCAG recognized that its growth projections do not constitute a prescriptive pattern for the General Plan or zoning code amendment. Potential exceedances may not be used to impede a jurisdiction’s compliance with the 6th Cycle RHNA requirements. In addition, future housing development facilitated by the Housing Element Update would be subject to the City’s development review process, and requirements to comply with applicable federal, State, and local laws and local policies and regulations, as applicable Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 37 to new housing development. As such, the approved Housing Element Update would be consistent with applicable land use and planning policies in the State, regional, and local context as necessary to meet that legislation. Impacts would be less than significant.
The 2022 IS-MND determined that compliance with SB 166 would minimize the potential for future housing displacement. All approved Housing Element Update actions would occur such that there is no net loss of residential unit capacity. Therefore, there would be no impact concerning displacements of substantial numbers of existing people or housing and the construction of replacement housing.
The proposed Zone Amendment and Reclassification does not change the number or location of any housing opportunity sites in the city. The proposed Project would accommodate up to 1,732 total future residential units which includes a 30 percent buffer and 400 ADUs. Under the proposed Project, owners and developers may utilize the R-40 Zoning Overlay in order to increase housing density to 40 units per acre and encourage the development of low-income housing. Similar to the approved Housing Element Update, the proposed Zone Amendment and Reclassification would exceed SCAG’s growth projection. The City has a total existing population of 61,338 people. A total of 1,732 units would increase the population of Pico Rivera by 6,426 residents. This would constitute a 0.5 percent increase over SCAG’s 2045 population projection of 67,400 residents. Similar to the approved Housing Element Update, the proposed Project would be required to be in compliance with all state housing law. Potential exceedances of the projected population may not be used to impede the City’s compliance with the 6th Cycle RHNA. Future housing development facilitated by the proposed Project would be subject to the City’s development review process, and requirements to comply with applicable federal, State, and local laws and local policies and regulations, as applicable to new housing development.
Similar to the approved Housing Element Update, compliance with SB 166 would minimize potential for future housing displacement. In addition, the R-40 Zoning Overlay aims to increase residential unit capacity. The proposed Project would have no impact concerning the displacement of substantial numbers of existing people or housing and the construction of replacement housing.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting population and housing. As a result, the proposed Zone Amendment and Reclassification would not introduce new or substantially increased impacts related to land use and would be consistent with the impact analysis provided in the approved Housing Element Update IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less Than Significant (Same as Approved Housing Element Update)
4.15 Public Services
The 2022 IS-MND determined that public services impact from implementation of the approved Housing Element Update would be less than significant with no mitigation required (Section 4.15, City of Pico Rivera
Zone Code Amendments and Zone Reclassification
38 Public Services). Implementation of the approved Housing Element Update would result in an increase in residential and commercial development, and thus, would increase demand for fire and police protection services and facilities, school facilities, and recreation facilities. However, 68 of all 69 sites are currently developed and are being serviced adequately by existing fire and police services. Housing Element Update implementation would result in intensification of development and/or change of use, or construction on previously vacant sites. However, all candidate housing sites are within urbanized areas, surrounded by development, and served by the Los Angeles County Fire Department (LACFD) and Los Angeles County Sheriff’s Department (LASD). Regarding school facilities, future applicants would be subject to school developer fees from the El Rancho Unified School District (ERUSD) and Montebello Unified School District (MUSD). The approved Housing Element Update determined that payment of the developers’ fees would provide an adequate financial base to construct and equip new and existing schools, and would be deemed full and complete mitigation of the impacts pursuant to Government Code Section 65995(3)(h).
Impacts related to parks and recreation may be found below in Section 16, Recreation. In addition, the 2022 IS-MND determined that future development resulting in population growth would incrementally increase demand for libraries. However, the Los Angeles County Library system has developed a Strategic Plan that identifies goals and objectives including financial management and fundraising strategies to maintain and enhance library facilities to meet future demands. Therefore, increased demand would not be substantial or such that it would warrant construction of a new facility.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Future housing development facilitated by the proposed Zone Amendment and Reclassification and the resulting population growth of approximately 6,426 persons, would increase the use of existing public facilities. Development under the proposed Project would occur on the same candidate housing sites which are currently served by LACFD and LASD, which would place an incrementally higher demand on police and fire services in the city compared to the approved Housing Element Update due to the increase in the projected population, and the potential for developers to utilize the R-40 Zoning Overlay increasing building density. However, all future housing development facilitated by the Housing Element Update would be subject to the City’s development review process, and adherence to 2019 California Fire Code and Municipal Code Section 15.44, Fire Code. Compliance with the established regulatory framework would minimize impacts to fire protection services. In addition, future housing development facilitated by the proposed Project would be required to submit a will-serve letter or service questionnaire to the Police Department in conjunction with development applications to ensure that police protection services are available to serve the proposed housing development.
The City is served by the ERUSD and MUSD, which provide public education for grades kindergarten through 6 and grades 7 through 12, respectively. Future housing development facilitated by the proposed Zone Amendment and Reclassification and the resulting population growth of approximately 6,426 persons would incrementally increase the demand for school services. Similar to the approved Housing Element Update, any future housing development facilitated by the Housing Element Update would be required to comply with SB 50 requirements, which allow school districts to collect impact fees from developers of new residential projects to offset the cost of new development pursuant to Government Code Section 665995(3)(h). Similar to the approved Housing Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 39 Element Update, the Los Angeles County Library system has developed a Strategic Plan that identifies long-term goals and objectives to maintain and enhance library facilities to meet future demands.
Overall, while the proposed Zone Amendment and Reclassification analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, no new or expanded public service facilities would be required. The proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to public services and would be consistent with the impact analysis provided in the 2022 approved Housing Element Update ISMND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact (Same as Approved Housing Element Update)
4.16 Recreation
The 2022 IS-MND determined that impacts to recreational facilities from implementation of the approved Housing Element Update would be less than significant with mitigation required (Section
4.16, Recreation,). As of 2021, the City has a parkland ratio of 1.9 acres per 1,000 residents.
General Plan Policy 10.7-1 Parks Master Plan strives to attain a parks standard of three acres per 1,000 people, meaning that the City currently has a deficit of recreational facilities. Future housing development facilitated by the approved Housing Element Update and the resulting population growth of approximately 4,942 persons, which would incrementally increase the use of existing recreational facilities. To avoid the overuse of existing recreational facilities, such that substantial physical deterioration would occur, payment of Park Land Dedication or In-Lieu fees would be required to mitigate potential effects to a less than significant level. The approved Housing Element Update IS-MND also determined that if construction of recreational facilities is warranted, that proposal would be subject to the City’s development review process and CEQA evaluation. A less than significant impact would occur regarding the construction and expansion of recreational facilities.
The 2022 IS-MND found that the following measure shall be implemented as standard condition/condition of approval for future housing projects:
Measure SC REC-1: The applicant shall in-lieu of dedicating park land pay park fees equal to the value of the land prescribed for dedication in Municipal Code Section
17.36.190 hereof in an amount determined in accordance with the provisions of Section 17.36.230.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Future housing development facilitated by the proposed Zone Amendment and Reclassification and the resulting population growth of City of Pico Rivera
Zone Code Amendments and Zone Reclassification
40 approximately 6,426 persons, and incrementally increase the use of existing recreational facilities such that substantial physical deterioration could occur or be accelerated, and potentially worsen the city’s existing parkland deficit.
To avoid the overuse of existing recreational facilities, such that substantial physical deterioration would occur, future housing developments would be subject to General Plan Policy 10.7-3, New Development, which requires new residential development, which include a subdivision, to dedicate land and/or contribute in-lieu fees at a standard of 3 acres per 1,000 population, and contribute park development fees, to finance acquisition, development, improvement, and maintenance of park and recreational facilities. Municipal Code Chapter 17.36, Article II, Park Land Dedication or InLieu Fees identifies that park and recreation impact land dedications and/or fees are applicable as a condition of approval of a final tract map. Payment of fees helps fund the acquisition and development of new or rehabilitating existing park and recreational facilities needed to accommodate demands created by the addition of residential dwelling units. Adherence to mandatory permit requirements and regulations for providing recreation would support the City’s goals for providing sufficient recreation opportunities for residents. The proposed Zone Amendment and Reclassification would utilize Measure SC REC-1 to mitigate potential impacts to recreational facilities to a less than significant level.
Future housing development facilitated by the proposed Project and the resulting population growth of approximately 6,426 persons would incrementally increase demand for park and recreation land by approximately 19.28 acres (based on General Plan Healthy Communities Element Policy 10.7-3, New Development). All future housing development facilitated by the proposed Zone Amendment and Reclassification would be subject to the City’s development review process and required to demonstrate consistency with General Plan Policy 10.7-3. If future development of recreational facilities is required, that proposal would be subject to the City’s development review process and CEQA evaluation to determine whether adverse effects on the environment. Therefore, a less than significant impact would occur regarding the construction or expansion of recreational facilities.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting recreation. As a result, the proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to parks or recreation and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant with Mitigation (Same as Approved Housing Element Update)
4.17 Transportation
The 2022 IS-MND determined that transportation impacts associated with implementation of the approved Housing Element Update would be less than significant (Section 4.17, Transportation, of Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 41 the 2022 IS-MND). The approved Housing Element Update does not include any goals, policies, or implementation programs that would conflict with plans or other regulations that address the circulation system, including roadways, transit, bicycle, pedestrian, and equestrian facilities. Future development projects would be reviewed on a case-by-case basis to ensure consistency with applicable regulations that address the circulation system, including regulations related to VMT and emergency access. Future housing development facilitated by the approved Housing Element Update would be required to comply with several General Plan policies which directly aim to reduce VMT. Any traffic demand management (TDM) measures required for mitigation would be required to comply with Los Angeles County’s VMT guidelines.
Since future housing development facilitated by the approved Housing Element Update would use existing roadways that are connected and adjacent to the existing transportation network, hazards due to a geometric design feature or incompatible uses are not anticipated. All future housing development on the candidate housing sites with the potential to substantially increase transportation-related hazards would be subject to the City’s development review and required to comply with applicable building and fire safety regulations required for the design of new housing and emergency access, as wells as and all State and local requirements for avoiding construction and operations impacts related to design and incompatible uses. In regard to emergency access, the City has adopted the California Fire Code, which sets standards for road dimension, design, grades, and other fire safety features. More stringent California Building Code standards apply regarding new construction and development of emergency access issues associated with earthquakes, flooding, climate/strong winds, and water shortages. Therefore, compliance with the code requirements would ensure adequate access issues, including emergency access. As a result, implementation of the approved Housing Element Update would result in a less than significant impact.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Similar to the approved Housing Element Update, the proposed Project does not include any goals, policies, or implementation programs that would conflict with plans or other regulations that address the circulation system, including roadways, transit, bicycle, pedestrian, and equestrian facilities as the proposed Project is meant to work with and be in compliance of the City’s General Plan. Future development projects would be reviewed on a case-by-case basis to ensure consistency with applicable regulations that address the circulation system. Future development projects would be reviewed on a case-by-case basis to ensure consistency with applicable regulations that address the circulation system, including regulations related to VMT and emergency access.
The City has adopted the Los Angeles County VMT Thresholds (Fehr and Peers 2020). The Steering Committee recommends that the County define VMT impacts for land use projects and plans based on the Air Resources Board target of 16.8 percent. A 16.8 percent VMT reduction threshold sets a higher standard than the suggested Office of Planning and Research threshold of 15 percent and would allow the County to align with state climate goals (Fehr and Peers 2020). A project would have a significant impact if the VMT rate for the plan would exceed 16.8 percent below the applicable baseline VMT rate.
A VMT Analysis was prepared by Translusions, Inc. for the proposed Zone Amendment and Reclassification (included as Appendix B). The VMT Analysis utilizes the SCAG RTP/SCS model’s base year of 2016 and horizon year of 2040. Through discussions with the City, the analysis was City of Pico Rivera
Zone Code Amendments and Zone Reclassification
42 conducted for the years 2020 and 2040. The analysis used the following thresholds to determine whether the proposed Zone Amendment and Reclassification would result in a significant Project generated VMT:
The baseline Project generated VMT per service population (VMT/SP) exceeds the baseline VMT/SP for the City, or
The cumulative Project generated VMT /SP exceeds the future year VMT/SP for the City.
Project-generated VMT was determined under the 2040 horizon to account for development under the proposed Project. It was determined that the baseline (2020) plus Project VMT/SP is 10.83 miles while the without Project VMT/SP is 10.88 miles. The Project related VMT/SP is 9.67, which is less than the baseline VMT/SP for the City (see Appendix B for complete results). Therefore, the Project has a less than significant VMT impact under baseline conditions. In regard to projected VMT, the year 2040 plus Project VMT/SP is 11.23 miles while the without Project VMT/SP is 11.30 miles. The Project related VMT/SP is forecasted to be 9.67, which is below the baseline VMT/SP for the City (Appendix B). Therefore, the VMT/SP is estimated to decrease with buildout of the proposed Project thereby resulting in fewer trips (i.e., mobile noise) when compared to buildout under existing land use designations, and VMT impacts would be less than significant. Additionally, a cumulative impact would occur if there would be a net increase in total regional VMT.
The total VMT in the City in the horizon year 2040 without the proposed Zone Amendment and Reclassification would be 2,564,970 (Appendix B). With the proposed Project, the total VMT for the City would be 2,659,363 (Appendix B). Therefore, there would be an increase in total VMT of 94,393 and may be considered significant. However, similar to the approved Housing Element Update, future housing development facilitated by the proposed Project would be required to comply with several General Plan policies which directly aim to reduce VMT. Given that the housing sites of the proposed Project have not changed, all candidate housing sites would still be located in urban and developed areas placing residents closer to employment and commercial areas, further increasing opportunities to reduce VMT and increase the ease of walking, cycling, and use of public transit.
In addition, the zone code amendments and reclassification of the proposed Zone Amendment and Reclassification would be consistent with Measure T-1 (Increase Residential Density) of the California Air Pollution Control Officers Association’s (CAPCOA) Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity, and therefore could have a reduction of 0.22 percent for every one percent increase in residential density (CAPCOA 2021). Applying this reduction indicates the proposed Zone Amendments and Reclassification would decrease overall VMT produced by the proposed Project. Cumulative transportation impacts would be reduced to a less than significant level.
Similar to the approved Housing Element Update, future housing projects facilitated by the proposed Zone Amendment and Reclassification would be required to comply with General Plan Circulation Element Policy 5.2-10, Traffic Studies, which requires the preparation of site-specific traffic studies for new development proposals that are determined by the City to have the potential to impact traffic. Future housing development facilitated by the proposed Project would be required to comply with applicable building and fire safety regulations required for the design of new housing and emergency access; and would be required to adhere to all State and local requirements for avoiding construction and operations impacts related to design and incompatible uses. As a result, future housing development facilitated by the proposed Project would not substantially increase hazards due to design features or incompatible uses.
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 43 Similar to the approved Housing Element Update, the proposed Project must be in compliance with the California Fire Code and California Building Code regarding new construction and development of emergency access issues associated with earthquakes, flooding, climate/strong winds, and water shortages. Therefore, compliance with the code requirements would ensure adequate access issues, including emergency access. Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting transportation.
Therefore, the proposed Zone Amendment and Reclassification would not result in new or substantially more severe impacts to transportation, and the proposed Project would therefore be consistent with the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact (Same as Approved Housing Element Update)
4.18 Tribal Cultural Resources
Chapter 532 Statutes of 2014 (i.e., AB 52) requires that lead agencies evaluate a project’s potential impact on “tribal cultural resources.” In compliance with PRC Section 21080.3.1(b), the City has provided formal notification to California Native American tribal representatives identified by the California Native American Heritage Commission. Native American groups may have knowledge about cultural resources in the area and may have concerns about adverse effects from development on tribal cultural resources as defined in PRC Section 21074. The City contacted a total of ten (10) tribes and received a response from one, the Gabrieleno Band of Mission Indians – Kizh Nation. While the approved Housing Element Update does not propose any development or ground-disturbing activities such as grading or excavation, it can be assumed that future housing development on the candidate housing sites facilitated by the approved Housing Element Update could directly or indirectly impact undiscovered subsurface tribal cultural resources through such activities. The likelihood of encountering tribal cultural resources is greatest where sites that have been minimally excavated in the past (e.g., undeveloped parcels, vacant lots, and lots containing undeveloped areas). In the likelihood that future housing development would impact tribal resources, compliance with the Measure SC TCR-1 addresses actions associated with tribal resources would mitigate potential impacts.
The 2022 IS-MND found that the following measure shall be implemented as standard condition/condition of approval for future housing projects:
Measure SC TCR-1 Unanticipated Discovery of Tribal Cultural and Archaeological Resources:
Upon discovery of any tribal, cultural, or archaeological resources during ground-disturbing activities, the applicant shall immediately cease such activities in the immediate vicinity. The find will then be assessed by a qualified archeologist retained by the Applicant and a tribal monitor/consultant approved by the consulting tribe. The applicant shall promptly notify the Director of Community and Economic Development to the discovery of resources. If the resources are Native American in origin, the City of Pico Rivera
Zone Code Amendments and Zone Reclassification
44 consulting tribe shall coordinate with the landowner regarding treatment and curation of these resources. Typically, the tribe will request preservation in place or recovery for educational purposes. At the direction of the qualified archaeologist and tribal monitor/consultant, and in coordination with the Community and Economic Development Division, work may continue on other parts of the affected site while evaluation and, if necessary, additional protective measures are completed at the affected portion of the site pursuant to State CEQA Guidelines Section 15064.5 [f]. If a resource is determined by the qualified archaeologist to constitute a “historical resource” or “unique archaeological resource,” time and funding to allow for sufficient implementation of avoidance measures must be made available.
The treatment plan established for the resources shall be in accordance with State CEQA Guidelines Section 15064.5(f) for historical resources.
Preservation in place (i.e., avoidance) is the preferred manner of treatment upon identification of unique archeological resources (Public Resources Code Section 21083.2(b)). If preservation in place is not feasible, treatment may include implementation of archaeological data recovery excavations to remove the resource along with subsequent laboratory processing and analysis. All tribal cultural resources shall be returned to the consulting tribe.
Any historic archaeological material that is not Native American in origin shall be curated at a public, non-profit institution with a research interest in the materials. Acceptance and curation of the historic archeological materials will be at the discretion of the institution. If no institution accepts the archaeological material, they shall be offered to the consulting tribe or the Pico Rivera History and Heritage Society for educational purposes.
While the candidate housing sites would remain the same as those in the approved Housing Element Update, the proposed Zone Amendment and Reclassification may still have an impact on tribal cultural resources. Development of the proposed Project would require the incorporation of Measure SC CUL-1 (noted above) from the approved Housing Element Update. In addition, all future housing development facilitated by the Housing Element Update would be subject to the City’s development review process and would be required to comply with federal, State, and local requirements for the protection of tribal cultural resources. This includes compliance with CEQA Section 21074 and the City’s Environmental Resources Element, Goal 8.7, which aims to preserve important historical, archaeological, and paleontological resources that contribute to the City’s identity and character. Compliance with this mitigation measure would ensure that impacts to tribal cultural resources would be less than significant.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting tribal cultural resources. Therefore, the proposed Zone Amendment and Reclassification would not introduce new impacts or substantially increased impacts related to tribal cultural resources and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 45 Conclusion
Less than Significant Impact with Mitigation (Same as Approved Housing Element Update)
4.19 Utilities and Service Systems
The 2022 IS-MND determined that utilities and service systems impacts from implementation of the approved Housing Element Update would be less than significant with mitigation required (Section
4.19, Utilities and Service Systems, of the 2022 IS-MND). Pico Rivera is served by the City of Pico Rivera Water Authority (PRWA), Pico Water District (PWD) and San Gabriel Valley Water Company (SGVWD). All candidate housing sites are located in the services area of either PRWA, PWD or SGVWD. In addition, all but one candidate housing site is currently developed with existing water infrastructure. The approved Housing Element Update is not anticipated to require or result in the relocation or construction of new or expanded water facilities that could cause significant environmental effects. The City of Pico Rivera’s Sewer Division is responsible for the collection of wastewater in the City and delivery to the trunk sewer mains of the Los Angeles County Sanitation Districts (LACSD). The forecasted population growth induced by the approved Housing Element Update is 4,942 persons. Additionally, the City’s forecast population including future housing development facilitated by the approved Housing Element Update of approximately 69,642 persons would be 542 persons greater than SCAG’s forecast population of 69,100 persons by 2040.
However, this difference in persons is less than one percent of SCAG’s forecast population by 2040 and would not be large enough of a change to significantly impact existing wastewater facilities.
The 2022 IS-MND also determined that project implementation would not require construction or relocation of new or expanded storm drainage facilities as the majority of the candidate housing sites are currently developed and surface flows are directed towards the City’s existing facilities.
Additionally, development facilitated by the proposed Project would be compliant with all applicable City policies regarding storm drainage such as Municipal Code Chapter 16.04 and the City’s Urban Greening Plan. Similarly, the approved Housing Element Update would have a less than significant impact on electrical power, natural gas, and telecommunication facilities as the approved Housing Element Update would be required to be consistent with the City’s various programs aimed at ensuring adequate supplies and service infrastructure.
Future housing development would be required to comply with Measure SC UTI-1, which mandates the incorporation of water conservation practices, designs, and technology into proposed structures. Future development satisfying certain criteria would be required to prepare a Water Supply Assessment (WSA) in order to verify sufficient water supply is available to meet the development’s water demand. Future housing development would be required to submit specific development plans to the City, PRWA, PWD and/or SGVWD substantiating that adequate water supplies would be available. Future housing development would also be subject to development review and required to comply with requirements related to wastewater treatment during construction and operations, including the City’s Sanitary Sewers and Industrial Waste Ordinance (Municipal Code Section 13.28.010) and the Construction General Permit. The City levies connection fees for new or expanded sewer connections, including those to new development. These connection fees help fund the costs associated with providing wastewater facility capacity to both new users requiring new connections, as well as existing users requiring additional capacity.
Compliance with the City’s regulations regarding the provision of sewer services would ensure the City has capacity to accommodate development of the approved Housing Element Update.
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
46 The approved Housing Element Update determined that future housing development would be subject to the City’s development review process and be required to adhere to all federal, State, and local requirements for solid waste reduction and recycling. Considering these requirements, the approved Housing Element Update’s implementation would not generate solid waste in excess of State or local standards, or in excess of local infrastructure’s capacity. In addition, the approved Housing Element Update would have no impact on regulations regarding solid waste, as development facilitated by the approved Housing Element Update would comply with all applicable policies regarding solid waste such as the CalGreen Code, AB 939, and SB 341.
The 2022 IS-MND found that the following measures shall be implemented as standard conditions/conditions of approval for future housing projects:
Measure SC UTI-1 Applicant shall include water conservation practices, designs, and technology into the proposed structures. These shall include low-flow showerheads, faucets, appliances, and toilets.
Measure SC UTI-2 The City shall not approve development beyond anticipated 2025 growth projections until securing additional water supplies or demonstrating in the UWMPs or project-specific Water Supply Assessment that water supply amounts are available to meet existing and project water demand.
While the 2022 IS-MND also acknowledges that an additional 400 ADUs would be developed atop the 1,332 housing units, it does not analyze a full buildout of 1,732 housing units. Therefore, this analysis considers impacts associated with the development of an additional 400 ADUs for a total of 1,732 housing units under the Proposed project. Future housing development facilitated by the proposed Project and the resulting population growth of approximately 6,426 persons, and incrementally increase the use of existing utilities.
Similar to the approved Housing Element Update, all candidate housing sites under the proposed Zone Amendments and Reclassification are located in the services area of either PRWA or PWD. In addition, all but one candidate housing site is currently developed with existing water infrastructure. The proposed Project is not anticipated to require or result in the relocation or construction of new or expanded water facilities that could cause significant environmental effects.
In addition, implementation of the proposed Project would not require construction or relocation of new or expanded storm drainage facilities as the majority of the candidate housing sites are currently developed and surface flows are directed towards the City’s existing facilities. Similar to the approved Housing Element Update, the proposed Project would have a less than significant impact on electrical power, natural gas, and telecommunication facilities as the Project would be required to be consistent with the City’s various programs aimed at ensuring adequate supplies and service infrastructure.
The proposed Zone Amendments and Reclassification is anticipated to require of approximately 198 acre-feet (AF) of water per year (Appendix A). According to the PWD 2020 Urban Water Management Plan (UWMP), and as shown in Table 6 through Table 8 below, PWD would have adequate water supplies through 2045 in normal, single dry year, and multiple dry year conditions (PWD 2021).
Table 6 Normal Year Supply and Demand Comparison (AF)
2025 2030 2035 2040 2045
Supply Totals 2,931 2,961 2,990 3,021 3,051
Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 47 Demand Totals 2,931 2,961 2,990 3,021 3,051
Difference 0 0 0 0 0
Source: Pico Rivera 2021
Table 7 Single Dry Year Supply and Demand Comparison (AF) 2025 2030 2035 2040 2045
Supply Totals 2,930 2,959 2,989 3,020 3,050
Demand Totals 2,930 2,959 2,989 3,020 3,050
Difference 0 0 0 0 0
Source: Pico Rivera 2021
Table 8 Multiple Dry Years Supply and Demand Comparison (AF) 2025 2030 2035 2040 2045
First Year Supply Total 3,279 3,312 3,345 3,379 3,413
Demand Totals 3,279 3,312 3,345 3,379 3,413
Difference 0 0 0 0 0
Second
Year
Supply Total 3,275 3,309 3,342 3,376 3,410
Demand Totals 3,275 3,309 3,342 3,376 3,410
Difference 0 0 0 0 0
Third
Year
Supply Total 3,379 3,414 3,448 3,483 3,518
Demand Totals 3,379 3,414 3,448 3,483 3,518
Difference 0 0 0 0 0
Fourth
Year
Supply Total 3,260 3,293 3,326 3,360 3,394
Demand Totals 3,260 3,293 3,326 3,360 3,394
Difference 0 0 0 0 0
Fifth Year Supply Total 2,848 2,877 2,906 2,936 2,965
Demand Totals 2,848 2,877 2,906 2,936 2,965
Difference 0 0 0 0 0
Source: Pico Rivera 2021
PWD has reduced its reliance on imported water supplies, through the Water Replenishment District of Southern California’s (WRD) replacement of imported water with recycled water for groundwater replenishment purposes. WRD primary water supply is collected from the Central Basin. In each drought cycle the Central Basin has been managed to maintain water levels.
Therefore, based on historical and on-going management practices, PWD will be able to rely on the Central Basin for adequate supply over the next 25 years under single dry years and a five consecutive year drought periods. In addition, the proposed Zone Amendments and Reclassification would incorporate Measures SC UTI-1 and UTI-2 to ensure that water would be used efficiently, and that development facilitated by the Project would not have a significant impact on supplies. Impacts to water supply and reliability would be less than significant.
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
48 Wastewater creation is conservatively assumed to be 100 percent of total water consumption. Thus, it can be anticipated that the proposed Zone Amendments and Reclassification would result in approximately 64,558,222 gallons (or 198 AF) of wastewater per year, or 176,872 gallons of wastewater per day. Similar to the approved Housing Element Update, wastewater from the proposed Project would be collected locally and delivered to the regional trunk lines, and wastewater flows south toward LASCD’s Los Coyotes Water Reclamation Plant in the City of Cerritos. Los Coyotes Water Reclamation Plant currently provides primary, secondary, and tertiary treatment for a design capacity of 37.5 million gallons of wastewater per day. The proposed Zone Amendments and Reclassification would utilize approximately 0.5 percent of the Los Coyotes Water Reclamation Plant current daily capacity. Future housing development under the proposed Project would be subject to development review and would be required to comply with requirements related to wastewater treatment during construction and operations, including the City’s Sanitary Sewers and Industrial Waste Ordinance (Municipal Code Section 13.28.010) and the Construction General Permit. The City levies connection fees for new or expanded sewer connections, including those to new development (Municipal Code Sections 13.16.120 and 13.16.140). These connection fees help fund the costs associated with providing wastewater facility capacity to both new users requiring new connections, as well as existing users requiring additional capacity. Considering these requirements, and the available capacity previously discussed, no new expansions of infrastructure facilities are required, and no direct physical impact on the environment would occur. Therefore, impacts would be less than significant.
Solid waste generated within the City is collected by NASA Services Inc. The residential, commercial, and industrial services include curbside collection of waste, commingled recyclables, and green waste. Pico Rivera has a number of waste diversion programs in place to minimize the need for landfill disposal of solid wastes, including a Demolition and Recycling ordinance in compliance with AB 939. The proposed Project would generate approximately 433 tons of water per year (Appendix A). It is anticipated that solid waste from future housing development would be disposed of at the closest landfills: Savage Canyon Landfill, Scholl Canyon Landfill, and the Azusa Land Reclamation Company Landfill. The Savage Canyon Landfill is permitted to receive 350 tons per day and has a remaining capacity of approximately four million tons. The Scholl Canyon Landfill is permitted to receive 3,400 tons per day and has a remaining capacity of approximately four million tons. The Azusa Land Reclamation Company Landfill is permitted to receive 8,000 tons per day and has a remaining capacity of approximately 59 million tons (County of Los Angeles Public Works 2019). All solid waste facilities have adequate remaining capacity to accommodate development facilitated by the proposed Zone Amendments and Reclassification. Impacts would be less than significant.
Regulations specifically applicable to the proposed Project include the California Integrated Waste Management Act of 1989 (AB 939), Section 4.408 of the CalGreen Code, and SB 341, which requires multi‐family residential development and commercial uses to implement recycling programs. The Integrated Waste Management Act, which requires every city and county in the State to prepare a Source Reduction and Recycling Element (SRRE) to its Solid Waste Management Plan, identifies how each jurisdiction will meet the State’s mandatory waste diversion goal of 50 percent by and after the year 2000. The diversion goal has been increased to 75 percent by 2020 by SB 341. The 2019 CalGreen Code Section 4.408 requires preparation of a Construction Waste Management Plan that outlines ways in which the contractor would recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition debris. As previously noted, the Project would not result in direct housing construction but would facilitate future housing development.
During the construction phase of future housing development, projects would comply with the CalGreen Code through the recycling and reuse of at least 65 percent of the nonhazardous Environmental Checklist and Impacts of the Proposed Zone Amendments and Reclassification Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 49 construction and demolition debris from the Project site. No conflict with statutes and regulations related to solid waste would occur.
Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact affecting utilities and service systems. As a result, the proposed Zone Amendments and Reclassification would not introduce new impacts or substantially increased impacts related to utilities and other service systems and would be consistent with the impact analysis provided in the 2022 IS-MND for the approved Housing Element. Impacts would be less than significant.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
Less than Significant Impact with Mitigation (Same as Approved Housing Element Update)
4.20 Wildfire
The approved 2022 IS-MND determined that the approved Housing Element Update would have no impact to any emergency response or evacuation plans, would not exacerbate wildfire risks, and would not expose people or structures to significant risk of flooding or landslides. According to CalFire Fire Hazard Severity Zone Map for Los Angeles County, the City is in a Non-Very High Fire Hazard Severity Zone (Non-VHFHSZ) within a local responsibility area (LRA). No candidate housing sites are near a fire hazard severity zone. There would be no impact to wildfire and mitigation would not be required.
Similar to the area of the approved Housing Element Update, the area for the proposed Zone Amendments and Reclassification includes urbanized development with residential uses. All 69 candidate housing sites would remain the same as in the approved Housing Element Update. The City is in a Non-VHFHSZ within a LRA. No candidate housing sites are near a fire hazard severity zone. Although the proposed Project analyzes the additional 400 ADUs not previously analyzed in the approved Housing Element Update, the additional residential units under the proposed Project would not result in a new significant impact regarding wildfire. Therefore, the proposed Project would not introduce new impacts or substantially increased impacts related to wildfire and would be consistent with the impact analysis provided in the 2022 IS-MND.
Effects and Mitigation Measures
No new significant impacts or substantial increase in previously identified significant impacts would occur related to aesthetics, and no new mitigation measures are necessary.
Conclusion
No Impact (Same as Approved Housing Element Update)
City of Pico Rivera
Zone Code Amendments and Zone Reclassification
50 5 Conclusion
As discussed in detail in Section 4, Environmental Checklist and Impacts of the Proposed Project, potential impacts associated with the proposed Zone Amendments and Reclassification are consistent with potential impacts characterized and mitigated for in the 2022 IS-MND for the approved Housing Element Update. Substantive revisions to the 2022 IS-MND are not necessary because no new significant impacts or impacts of substantially greater severity than previously described would occur as a result of the proposed Project. Therefore, the following determinations have been found to be applicable:
No further evaluation of environmental impacts is required for the proposed Project; No subsequent EIR or MND is necessary per Section 15162 of the CEQA Guidelines; and This Addendum is the appropriate level of environmental analysis and documentation for the proposed Project in accordance with Section 15164 of the CEQA Guidelines.
Pursuant to Section 15164(c) of the CEQA Guidelines, this Addendum will be included in the public record for the approved Housing Element Update. Documents related to this Addendum will be available at the City of Pico Rivera located at 6615 Passons Boulevard, Pico Rivera, California 90660.
References and Preparers
Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 51 6 References and Preparers
6.1 References
California Air Pollution Control Officers Association (CAPCOA). 2021. Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity.
https://www.airquality.org/ClimateChange/Documents/Handbook%20Public%20Draft_202 1-Aug.pdf (accessed February 2023).
California Energy Commission (CEC). 2021a. Electricity Consumption by Entity. http://www.ecdms.energy.ca.gov/elecbyutil.aspx (accessed February 2023). _____. 2021b. Gas Consumption by Entity. http://www.ecdms.energy.ca.gov/gasbyutil.aspx (accessed February 2023).
County of Los Angeles Department of Public Works. 2019. Los Angeles County Countywide Integrated Waste Management Plan.
https://dpw.lacounty.gov/epd/swims/ShowDoc.aspx?id=14372&hp=yes&type=PDF (accessed February 2023).
Pico Rivera, City of. 2021. Pico Rivera 6th Cycle Housing Element Update Initial Study and Mitigated Negative Declaration. December 2021. https://www.pico-rivera.org/wpcontent/uploads/2022/08/Pico-Rivera-HEU-IS-MND.pdf. (accessed February 2023).
Pico Water District (PWD). 2021. 2020 Urban Water Management Plan. https://www.picowaterdistrict.net/wp-content/uploads/2021/11/Final-Pico-Water-District2020-UWMP.pdf (accessed February 2023).
South Coast Air Quality Management District (SCAQMD). 2019. South Coast AQMD Air Quality Significance Thresholds. http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/scaqmd-air-quality-significance-thresholds.pdf (accessed February 2023).
Southern California Association of Governments (SCAG). 2020. The 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy of the Southern California Association of Governments. https://scag.ca.gov/sites/main/files/fileattachments/0903fconnectsocal-plan_0.pdf?1606001176 (accessed February 2023).
6.2 List of Preparers
This Addendum was prepared by Rincon Consultants, Inc. under contract to the City of Pico Rivera.
Persons and firms involved in data gathering, analysis, project management, and quality control include:
City of Pico Rivera (Lead Agency)
Julia Gonzalez, Deputy Director, Community and Economic Development Department Estefany Franco, Planner, Community and Economic Development Department City of Pico Rivera
Zone Code Amendments and Zone Reclassification
52 Rincon Consultants, Inc.
Kimiko Lizardi, Principal-In-Charge
Michael Rocque, Project Manager/Senior Environmental Planner Vanessa Villanueva, CEQA Project Manager/Senior Environmental Planner Susanne Huerta, Director of Environmental Planning
Antonia Davetas, Associate Planner
Nichole Yee, Associate Planner
Katherine Castanon, GIS Specialist
Translutions, Inc.
Sandipan Bhattacharjee, Principal
References and Preparers
Addendum to the Pico Rivera 6th Cycle Housing Element Update IS-MND 53 This page intentionally left blank.
Appendix A
CalEEMod Results
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 1 / 68
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year, Unmitigated
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
3. Construction Emissions Details
3.1. Demolition (2023) - Unmitigated
3.3. Site Preparation (2023) - Unmitigated
3.5. Grading (2023) - Unmitigated
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 2 / 68
3.7. Grading (2024) - Unmitigated
3.9. Building Construction (2024) - Unmitigated
3.11. Building Construction (2025) - Unmitigated
3.13. Building Construction (2026) - Unmitigated
3.15. Building Construction (2027) - Unmitigated
3.17. Building Construction (2028) - Unmitigated
3.19. Building Construction (2029) - Unmitigated
3.21. Building Construction (2030) - Unmitigated
3.23. Paving (2030) - Unmitigated
3.25. Architectural Coating (2027) - Unmitigated
3.27. Architectural Coating (2028) - Unmitigated
3.29. Architectural Coating (2029) - Unmitigated
3.31. Architectural Coating (2030) - Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 3 / 68
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.3. Area Emissions by Source
4.3.2. Unmitigated
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
4.10. Soil Carbon Accumulation By Vegetation Type
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 4 / 68
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 5 / 68
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 6 / 68
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
5.16.2. Process Boilers
5.17. User Defined
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 7 / 68
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 8 / 68
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Pico Rivera Zone Code Amendments and Zone Reclassification Project Lead Agency —
Land Use Scale Plan/community
Analysis Level for Defaults County
Windspeed (m/s) 1.80
Precipitation (days) 18.2
Location Pico Rivera, CA, USA
County Los Angeles-South Coast
City Pico Rivera
Air District South Coast AQMD
Air Basin South Coast
TAZ 4803
EDFZ 7
Electric Utility Southern California Edison
Gas Utility Southern California Gas
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Apartments Mid Rise 1,332 Dwelling Unit 91.7 1,278,720 0.00 0.00 4,942 — Apartments Low
Rise
400 Dwelling Unit 12.0 480,000 0.00 0.00 1,484 —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 9 / 68
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 8.12 18.8 39.8 111 0.07 1.81 21.1 21.7 1.66 10.2 11.8 — 28,078 28,078 1.18 1.51 85.7 28,635 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 8.06 18.7 37.4 96.2 0.07 1.59 21.1 21.5 1.47 5.02 5.39 — 27,048 27,048 1.10 1.51 2.22 27,516 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.50 13.3 21.0 69.3 0.05 0.92 15.0 15.2 0.85 3.55 3.81 — 19,518 19,518 0.78 1.08 24.5 19,874 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.00 2.43 3.84 12.6 0.01 0.17 2.73 2.78 0.15 0.65 0.69 — 3,231 3,231 0.13 0.18 4.05 3,290
2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 10 / 68
2023 4.80 4.03 39.8 36.9 0.06 1.81 19.9 21.7 1.66 10.2 11.8 — 6,887 6,887 0.28 0.06 1.22 6,914 2024 8.12 6.98 34.4 111 0.07 1.45 17.9 18.5 1.33 4.26 5.05 — 25,978 25,978 1.07 1.43 85.7 26,518 2025 7.73 6.65 22.5 103 0.07 0.52 17.9 18.4 0.44 4.26 4.70 — 25,514 25,514 1.07 1.43 79.2 26,048 2026 6.88 5.84 21.1 96.6 0.07 0.46 17.9 18.3 0.39 4.26 4.65 — 25,065 25,065 1.04 1.43 72.8 25,592 2027 7.76 18.8 21.5 107 0.07 0.40 21.1 21.5 0.37 5.02 5.39 — 28,078 28,078 1.18 1.51 76.7 28,635 2028 7.51 18.5 20.6 101 0.07 0.36 21.1 21.5 0.33 5.02 5.35 — 27,590 27,590 0.50 1.51 69.7 28,122 2029 7.27 18.3 19.4 95.6 0.07 0.33 21.1 21.5 0.31 5.02 5.33 — 27,111 27,111 0.49 1.51 63.0 27,636 2030 6.38 18.0 18.3 90.7 0.07 0.31 21.1 21.5 0.29 5.02 5.31 — 26,642 26,642 0.49 1.47 56.8 27,148 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2023 4.54 3.81 37.4 32.8 0.06 1.59 9.47 11.1 1.47 3.72 5.18 — 6,872 6,872 0.28 0.06 0.03 6,898 2024 8.06 6.89 34.4 96.2 0.07 1.45 17.9 18.5 1.33 4.26 5.05 — 25,061 25,061 1.10 1.46 2.22 25,526 2025 7.67 6.59 23.4 89.9 0.07 0.52 17.9 18.4 0.44 4.26 4.70 — 24,618 24,618 1.10 1.46 2.05 25,083 2026 6.87 5.80 21.9 84.8 0.07 0.46 17.9 18.3 0.39 4.26 4.65 — 24,190 24,190 1.07 1.43 1.89 24,646 2027 7.69 18.7 23.0 93.2 0.07 0.40 21.1 21.5 0.37 5.02 5.39 — 27,048 27,048 0.61 1.51 1.99 27,516 2028 7.47 18.4 21.6 88.7 0.07 0.36 21.1 21.5 0.33 5.02 5.35 — 26,581 26,581 0.53 1.51 1.80 27,046 2029 6.59 18.2 20.3 83.5 0.07 0.33 21.1 21.5 0.31 5.02 5.33 — 26,121 26,121 0.53 1.51 1.63 26,586 2030 6.31 17.9 19.2 79.1 0.07 0.31 21.1 21.5 0.29 5.02 5.31 — 25,669 25,669 0.49 1.47 1.47 26,120 Average
Daily
— — — — — — — — — — — — — — — — — —
2023 2.58 2.17 21.0 18.9 0.03 0.92 5.08 6.00 0.85 2.37 3.22 — 3,184 3,184 0.13 0.03 0.28 3,197 2024 4.85 4.13 20.5 55.3 0.05 0.62 10.7 11.3 0.58 2.89 3.47 — 13,688 13,688 0.59 0.71 17.7 13,932 2025 5.46 4.69 17.1 66.8 0.05 0.37 12.6 13.0 0.31 3.00 3.32 — 17,756 17,756 0.78 1.02 24.5 18,106 2026 4.89 4.13 16.0 62.9 0.05 0.33 12.6 13.0 0.28 3.00 3.28 — 17,446 17,446 0.76 1.02 22.5 17,793 2027 5.50 13.3 16.5 69.3 0.05 0.28 14.9 15.2 0.26 3.54 3.81 — 19,518 19,518 0.43 1.08 23.6 19,874 2028 5.33 13.2 15.5 65.8 0.05 0.26 15.0 15.2 0.24 3.55 3.79 — 19,233 19,233 0.38 1.08 21.6 19,586 2029 4.68 13.0 14.5 62.0 0.05 0.24 14.9 15.2 0.22 3.54 3.76 — 18,848 18,848 0.38 1.08 19.5 19,197 2030 1.50 3.86 5.75 19.7 0.02 0.13 4.25 4.38 0.12 1.01 1.13 — 5,705 5,705 0.12 0.30 4.96 5,802 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 11 / 68
Annual — — — — — — — — — — — — — — — — — —
2023 0.47 0.40 3.84 3.45 0.01 0.17 0.93 1.10 0.15 0.43 0.59 — 527 527 0.02 < 0.005 0.05 529 2024 0.89 0.75 3.74 10.1 0.01 0.11 1.95 2.06 0.11 0.53 0.63 — 2,266 2,266 0.10 0.12 2.93 2,307 2025 1.00 0.86 3.12 12.2 0.01 0.07 2.30 2.37 0.06 0.55 0.61 — 2,940 2,940 0.13 0.17 4.05 2,998 2026 0.89 0.75 2.93 11.5 0.01 0.06 2.30 2.36 0.05 0.55 0.60 — 2,888 2,888 0.13 0.17 3.72 2,946 2027 1.00 2.43 3.00 12.6 0.01 0.05 2.72 2.78 0.05 0.65 0.69 — 3,231 3,231 0.07 0.18 3.91 3,290 2028 0.97 2.41 2.82 12.0 0.01 0.05 2.73 2.78 0.04 0.65 0.69 — 3,184 3,184 0.06 0.18 3.57 3,243 2029 0.85 2.37 2.65 11.3 0.01 0.04 2.72 2.77 0.04 0.65 0.69 — 3,120 3,120 0.06 0.18 3.22 3,178 2030 0.27 0.70 1.05 3.60 < 0.005 0.02 0.78 0.80 0.02 0.18 0.21 — 944 944 0.02 0.05 0.82 961
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 13.2 51.1 36.4 114 0.23 2.90 0.07 2.97 2.91 0.01 2.92 1,003 55,415 56,418 88.9 0.49 12.7 58,800 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 4.22 42.6 35.5 15.6 0.23 2.87 0.07 2.94 2.87 0.01 2.88 1,003 55,145 56,148 88.9 0.47 12.6 58,523 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 7.11 46.8 8.12 71.2 0.05 0.63 0.07 0.70 0.63 0.01 0.65 1,003 19,783 20,786 88.2 0.42 12.6 23,129 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.30 8.55 1.48 13.0 0.01 0.11 0.01 0.13 0.12 < 0.005 0.12 166 3,275 3,441 14.6 0.07 2.09 3,829 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 12 / 68
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.07 0.06 0.04 0.59 < 0.005 < 0.005 0.07 0.07 < 0.005 0.01 0.01 — 170 170 0.01 0.01 0.09 172 Area 12.5 50.8 31.0 111 0.20 2.46 — 2.46 2.48 — 2.48 0.00 38,420 38,420 0.73 0.10 — 38,467 Energy 0.63 0.31 5.38 2.29 0.03 0.44 — 0.44 0.44 — 0.44 — 16,184 16,184 1.18 0.08 — 16,239 Water — — — — — — — — — — — 138 641 778 0.51 0.31 — 883 Waste — — — — — — — — — — — 865 0.00 865 86.5 0.00 — 3,027 Refrig. — — — — — — — — — — — — — — — — 12.6 12.6
Total 13.2 51.1 36.4 114 0.23 2.90 0.07 2.97 2.91 0.01 2.92 1,003 55,415 56,418 88.9 0.49 12.7 58,800 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 0.07 0.06 0.04 0.53 < 0.005 < 0.005 0.07 0.07 < 0.005 0.01 0.01 — 163 163 0.01 0.01 < 0.005 165 Area 3.52 42.2 30.1 12.8 0.19 2.43 — 2.43 2.43 — 2.43 0.00 38,157 38,157 0.72 0.07 — 38,197 Energy 0.63 0.31 5.38 2.29 0.03 0.44 — 0.44 0.44 — 0.44 — 16,184 16,184 1.18 0.08 — 16,239 Water — — — — — — — — — — — 138 641 778 0.51 0.31 — 883 Waste — — — — — — — — — — — 865 0.00 865 86.5 0.00 — 3,027 Refrig. — — — — — — — — — — — — — — — — 12.6 12.6
Total 4.22 42.6 35.5 15.6 0.23 2.87 0.07 2.94 2.87 0.01 2.88 1,003 55,145 56,148 88.9 0.47 12.6 58,523 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 0.07 0.06 0.05 0.55 < 0.005 < 0.005 0.07 0.07 < 0.005 0.01 0.01 — 165 165 0.01 0.01 0.04 167 Area 6.41 46.4 2.69 68.4 0.02 0.19 — 0.19 0.20 — 0.20 0.00 2,793 2,793 0.06 0.02 — 2,801 Energy 0.63 0.31 5.38 2.29 0.03 0.44 — 0.44 0.44 — 0.44 — 16,184 16,184 1.18 0.08 — 16,239 Water — — — — — — — — — — — 138 641 778 0.51 0.31 — 883 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 13 / 68
Waste — — — — — — — — — — — 865 0.00 865 86.5 0.00 — 3,027 Refrig. — — — — — — — — — — — — — — — — 12.6 12.6
Total 7.11 46.8 8.12 71.2 0.05 0.63 0.07 0.70 0.63 0.01 0.65 1,003 19,783 20,786 88.2 0.42 12.6 23,129 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.01 0.01 0.01 0.10 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 27.3 27.3 < 0.005 < 0.005 0.01 27.6 Area 1.17 8.48 0.49 12.5 < 0.005 0.03 — 0.03 0.04 — 0.04 0.00 462 462 0.01 < 0.005 — 464 Energy 0.11 0.06 0.98 0.42 0.01 0.08 — 0.08 0.08 — 0.08 — 2,679 2,679 0.20 0.01 — 2,688 Water — — — — — — — — — — — 22.8 106 129 0.09 0.05 — 146 Waste — — — — — — — — — — — 143 0.00 143 14.3 0.00 — 501 Refrig. — — — — — — — — — — — — — — — — 2.09 2.09
Total 1.30 8.55 1.48 13.0 0.01 0.11 0.01 0.13 0.12 < 0.005 0.12 166 3,275 3,441 14.6 0.07 2.09 3,829
3. Construction Emissions Details
3.1. Demolition (2023) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
3.39 2.84 27.3 23.5 0.03 1.20 — 1.20 1.10 — 1.10 — 3,425 3,425 0.14 0.03 — 3,437 Demolitio
n
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 14 / 68
Off-Road
Equipment
3.39 2.84 27.3 23.5 0.03 1.20 — 1.20 1.10 — 1.10 — 3,425 3,425 0.14 0.03 — 3,437 Demolitio
n
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.93 0.78 7.49 6.44 0.01 0.33 — 0.33 0.30 — 0.30 — 938 938 0.04 0.01 — 942 Demolitio
n
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.17 0.14 1.37 1.17 < 0.005 0.06 — 0.06 0.06 — 0.06 — 155 155 0.01 < 0.005 — 156 Demolitio
n
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.08 0.07 0.08 1.23 0.00 0.00 0.20 0.20 0.00 0.05 0.05 — 217 217 0.01 0.01 0.92 220 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.08 0.07 0.09 1.04 0.00 0.00 0.20 0.20 0.00 0.05 0.05 — 205 205 0.01 0.01 0.02 208 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 15 / 68
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.02 0.02 0.03 0.30 0.00 0.00 0.05 0.05 0.00 0.01 0.01 — 57.1 57.1 < 0.005 < 0.005 0.11 57.8 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.45 9.45 < 0.005 < 0.005 0.02 9.58 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.3. Site Preparation (2023) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
4.70 3.95 39.7 35.5 0.05 1.81 — 1.81 1.66 — 1.66 — 5,295 5,295 0.21 0.04 — 5,314 Dust
From
Material
Movement
— — — — — — 19.7 19.7 — 10.1 10.1 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 16 / 68
Off-Road
Equipment
0.77 0.65 6.53 5.83 0.01 0.30 — 0.30 0.27 — 0.27 — 870 870 0.04 0.01 — 873 Dust
From
Material
Movement
— — — — — — 3.23 3.23 — 1.66 1.66 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.14 0.12 1.19 1.06 < 0.005 0.05 — 0.05 0.05 — 0.05 — 144 144 0.01 < 0.005 — 145 Dust
From
Material
Movement
— — — — — — 0.59 0.59 — 0.30 0.30 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.10 0.08 0.09 1.43 0.00 0.00 0.23 0.23 0.00 0.05 0.05 — 253 253 0.01 0.01 1.07 257 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.02 0.01 0.02 0.21 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 39.9 39.9 < 0.005 < 0.005 0.08 40.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 17 / 68
Worker < 0.005 < 0.005 < 0.005 0.04 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 6.61 6.61 < 0.005 < 0.005 0.01 6.70 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.5. Grading (2023) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
4.43 3.72 37.3 31.4 0.06 1.59 — 1.59 1.47 — 1.47 — 6,598 6,598 0.27 0.05 — 6,621 Dust
From
Material
Movement
— — — — — — 9.20 9.20 — 3.65 3.65 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
4.43 3.72 37.3 31.4 0.06 1.59 — 1.59 1.47 — 1.47 — 6,598 6,598 0.27 0.05 — 6,621 Dust
From
Material
Movement
— — — — — — 9.20 9.20 — 3.65 3.65 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 18 / 68
Off-Road 0.82 0.69 6.93 5.84 0.01 0.30 — 0.30 0.27 — 0.27 — 1,227 1,227 0.05 0.01 — 1,231 Equipment
Dust
From
Material
Movement
— — — — — — 1.71 1.71 — 0.68 0.68 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.15 0.13 1.27 1.07 < 0.005 0.05 — 0.05 0.05 — 0.05 — 203 203 0.01 < 0.005 — 204 Dust
From
Material
Movement
— — — — — — 0.31 0.31 — 0.12 0.12 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.11 0.09 0.10 1.63 0.00 0.00 0.26 0.26 0.00 0.06 0.06 — 289 289 0.01 0.01 1.22 293 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.11 0.09 0.12 1.39 0.00 0.00 0.26 0.26 0.00 0.06 0.06 — 274 274 0.01 0.01 0.03 277 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.02 0.02 0.02 0.27 0.00 0.00 0.05 0.05 0.00 0.01 0.01 — 51.6 51.6 < 0.005 < 0.005 0.10 52.3 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 19 / 68
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 8.55 8.55 < 0.005 < 0.005 0.02 8.66 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.7. Grading (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
4.19 3.52 34.3 30.2 0.06 1.45 — 1.45 1.33 — 1.33 — 6,598 6,598 0.27 0.05 — 6,621 Dust
From
Material
Movement
— — — — — — 9.20 9.20 — 3.65 3.65 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
4.19 3.52 34.3 30.2 0.06 1.45 — 1.45 1.33 — 1.33 — 6,598 6,598 0.27 0.05 — 6,621 Dust
From
Material
Movement
— — — — — — 9.20 9.20 — 3.65 3.65 — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 20 / 68
Onsite 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 truck
Average
Daily
——————————————————
Off-Road
Equipment
1.01 0.85 8.25 7.26 0.01 0.35— 0.35 0.32— 0.32— 1,588 1,588 0.06 0.01— 1,594 Dust
From
Material
Movement
—————— 2.22 2.22— 0.88 0.88———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Annual——————————————————
Off-Road
Equipment
0.18 0.15 1.51 1.33 < 0.005 0.06— 0.06 0.06— 0.06— 263 263 0.01 < 0.005— 264 Dust
From
Material
Movement
—————— 0.40 0.40— 0.16 0.16———————
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Offsite——————————————————
Daily,
Summer
(Max)
——————————————————
Worker 0.10 0.09 0.10 1.51 0.00 0.00 0.26 0.26 0.00 0.06 0.06— 282 282 0.01 0.01 1.11 287 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
——————————————————
Worker 0.10 0.09 0.11 1.28 0.00 0.00 0.26 0.26 0.00 0.06 0.06— 268 268 0.01 0.01 0.03 271 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 21 / 68
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.02 0.02 0.03 0.32 0.00 0.00 0.06 0.06 0.00 0.01 0.01 — 65.4 65.4 < 0.005 < 0.005 0.12 66.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.06 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 10.8 10.8 < 0.005 < 0.005 0.02 11.0 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.9. Building Construction (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.44 1.20 11.2 13.1 0.02 0.50 — 0.50 0.46 — 0.46 — 2,398 2,398 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.44 1.20 11.2 13.1 0.02 0.50 — 0.50 0.46 — 0.46 — 2,398 2,398 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 22 / 68
Off-Road
Equipment
0.68 0.57 5.34 6.24 0.01 0.24 — 0.24 0.22 — 0.22 — 1,140 1,140 0.05 0.01 — 1,144 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.12 0.10 0.97 1.14 < 0.005 0.04 — 0.04 0.04 — 0.04 — 189 189 0.01 < 0.005 — 189 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 6.21 5.59 5.97 94.1 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 17,608 17,608 0.73 0.59 69.5 17,871 Vendor 0.47 0.18 7.03 3.45 0.04 0.08 1.58 1.67 0.08 0.44 0.52 — 5,973 5,973 0.24 0.82 16.2 6,241 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 6.16 5.51 7.07 79.5 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 16,688 16,688 0.76 0.62 1.80 16,893 Vendor 0.47 0.18 7.31 3.53 0.04 0.08 1.58 1.67 0.08 0.44 0.52 — 5,976 5,976 0.24 0.82 0.42 6,228 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 2.92 2.61 3.35 39.8 0.00 0.00 7.66 7.66 0.00 1.79 1.79 — 8,053 8,053 0.36 0.29 14.2 8,164 Vendor 0.22 0.09 3.52 1.66 0.02 0.04 0.75 0.79 0.04 0.21 0.25 — 2,841 2,841 0.12 0.39 3.31 2,964 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.53 0.48 0.61 7.26 0.00 0.00 1.40 1.40 0.00 0.33 0.33 — 1,333 1,333 0.06 0.05 2.36 1,352 Vendor 0.04 0.02 0.64 0.30 < 0.005 0.01 0.14 0.14 0.01 0.04 0.04 — 470 470 0.02 0.06 0.55 491 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 23 / 68
3.11. Building Construction (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.35 1.13 10.4 13.0 0.02 0.43 — 0.43 0.40 — 0.40 — 2,398 2,398 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.35 1.13 10.4 13.0 0.02 0.43 — 0.43 0.40 — 0.40 — 2,398 2,398 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.96 0.80 7.46 9.31 0.02 0.31 — 0.31 0.28 — 0.28 — 1,713 1,713 0.07 0.01 — 1,719 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.18 0.15 1.36 1.70 < 0.005 0.06 — 0.06 0.05 — 0.05 — 284 284 0.01 < 0.005 — 285 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 24 / 68
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Worker 5.97 5.35 5.40 86.8 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 17,242 17,242 0.73 0.59 63.1 17,500 Vendor 0.42 0.17 6.68 3.27 0.04 0.08 1.58 1.67 0.04 0.44 0.48 — 5,874 5,874 0.24 0.82 16.1 6,142 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 5.91 5.29 5.99 73.6 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 16,343 16,343 0.76 0.62 1.64 16,548 Vendor 0.42 0.17 6.96 3.30 0.04 0.08 1.58 1.67 0.04 0.44 0.48 — 5,877 5,877 0.24 0.82 0.42 6,129 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 4.20 3.76 4.62 55.2 0.00 0.00 11.5 11.5 0.00 2.70 2.70 — 11,847 11,847 0.54 0.42 19.5 12,006 Vendor 0.30 0.12 5.00 2.33 0.03 0.06 1.12 1.18 0.03 0.31 0.34 — 4,197 4,197 0.17 0.59 4.98 4,381 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.77 0.69 0.84 10.1 0.00 0.00 2.10 2.10 0.00 0.49 0.49 — 1,961 1,961 0.09 0.07 3.23 1,988 Vendor 0.05 0.02 0.91 0.43 0.01 0.01 0.20 0.22 0.01 0.06 0.06 — 695 695 0.03 0.10 0.82 725 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.13. Building Construction (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 25 / 68
Off-Road 1.28 1.07 9.85 13.0 0.02 0.38— 0.38 0.35— 0.35— 2,397 2,397 0.10 0.02— 2,405 Equipment
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
——————————————————
Off-Road
Equipment
1.28 1.07 9.85 13.0 0.02 0.38— 0.38 0.35— 0.35— 2,397 2,397 0.10 0.02— 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
——————————————————
Off-Road
Equipment
0.91 0.77 7.04 9.26 0.02 0.27— 0.27 0.25— 0.25— 1,712 1,712 0.07 0.01— 1,718 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Annual——————————————————
Off-Road
Equipment
0.17 0.14 1.28 1.69 < 0.005 0.05— 0.05 0.05— 0.05— 283 283 0.01 < 0.005— 284 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Offsite——————————————————
Daily,
Summer
(Max)
——————————————————
Worker 5.18 4.59 4.84 80.5 0.00 0.00 16.3 16.3 0.00 3.82 3.82— 16,896 16,896 0.70 0.59 57.2 17,147 Vendor 0.42 0.17 6.36 3.08 0.04 0.08 1.58 1.67 0.04 0.44 0.48— 5,772 5,772 0.24 0.82 15.6 6,040 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
——————————————————
Worker 5.18 4.56 5.43 68.7 0.00 0.00 16.3 16.3 0.00 3.82 3.82— 16,017 16,017 0.73 0.59 1.48 16,213 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 26 / 68
Vendor 0.41 0.16 6.65 3.15 0.04 0.08 1.58 1.67 0.04 0.44 0.48 — 5,775 5,775 0.24 0.82 0.40 6,027 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 3.68 3.24 4.22 51.4 0.00 0.00 11.5 11.5 0.00 2.70 2.70 — 11,610 11,610 0.52 0.42 17.7 11,766 Vendor 0.30 0.12 4.78 2.23 0.03 0.06 1.12 1.18 0.03 0.31 0.34 — 4,124 4,124 0.17 0.59 4.81 4,308 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.67 0.59 0.77 9.38 0.00 0.00 2.10 2.10 0.00 0.49 0.49 — 1,922 1,922 0.09 0.07 2.92 1,948 Vendor 0.05 0.02 0.87 0.41 0.01 0.01 0.20 0.22 0.01 0.06 0.06 — 683 683 0.03 0.10 0.80 713 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.15. Building Construction (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.23 1.03 9.39 12.9 0.02 0.34 — 0.34 0.31 — 0.31 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.23 1.03 9.39 12.9 0.02 0.34 — 0.34 0.31 — 0.31 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 27 / 68
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.88 0.74 6.71 9.24 0.02 0.24 — 0.24 0.22 — 0.22 — 1,712 1,712 0.07 0.01 — 1,718 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.16 0.13 1.22 1.69 < 0.005 0.04 — 0.04 0.04 — 0.04 — 283 283 0.01 < 0.005 — 284 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 5.02 4.43 4.30 74.9 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 16,572 16,572 0.70 0.59 51.6 16,818 Vendor 0.37 0.17 6.09 2.90 0.04 0.04 1.58 1.63 0.04 0.44 0.48 — 5,661 5,661 0.24 0.78 14.8 5,915 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 4.96 4.34 5.37 63.5 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 15,711 15,711 0.22 0.59 1.34 15,894 Vendor 0.36 0.16 6.34 2.97 0.04 0.04 1.58 1.63 0.04 0.44 0.48 — 5,664 5,664 0.24 0.78 0.38 5,903 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 3.54 3.10 3.84 47.6 0.00 0.00 11.5 11.5 0.00 2.70 2.70 — 11,388 11,388 0.16 0.42 15.9 11,534 Vendor 0.27 0.12 4.55 2.10 0.03 0.03 1.12 1.15 0.03 0.31 0.34 — 4,044 4,044 0.17 0.56 4.55 4,220 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.65 0.57 0.70 8.69 0.00 0.00 2.10 2.10 0.00 0.49 0.49 — 1,885 1,885 0.03 0.07 2.63 1,910 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 28 / 68
Vendor 0.05 0.02 0.83 0.38 0.01 0.01 0.20 0.21 0.01 0.06 0.06 — 670 670 0.03 0.09 0.75 699 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.17. Building Construction (2028) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.18 0.99 8.92 12.9 0.02 0.30 — 0.30 0.28 — 0.28 — 2,397 2,397 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.18 0.99 8.92 12.9 0.02 0.30 — 0.30 0.28 — 0.28 — 2,397 2,397 0.10 0.02 — 2,406 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.85 0.71 6.39 9.26 0.02 0.22 — 0.22 0.20 — 0.20 — 1,717 1,717 0.07 0.01 — 1,723 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.15 0.13 1.17 1.69 < 0.005 0.04 — 0.04 0.04 — 0.04 — 284 284 0.01 < 0.005 — 285 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 29 / 68
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 4.85 4.26 4.25 70.3 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 16,276 16,276 0.16 0.59 46.4 16,502 Vendor 0.37 0.13 5.82 2.80 0.04 0.04 1.58 1.63 0.04 0.44 0.48 — 5,529 5,529 0.20 0.78 14.0 5,779 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 4.82 4.23 4.84 59.8 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 15,431 15,431 0.19 0.59 1.20 15,614 Vendor 0.36 0.12 6.06 2.83 0.04 0.04 1.58 1.63 0.04 0.44 0.48 — 5,532 5,532 0.20 0.78 0.36 5,770 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 3.44 3.01 3.45 44.8 0.00 0.00 11.5 11.5 0.00 2.70 2.70 — 11,216 11,216 0.14 0.42 14.4 11,360 Vendor 0.26 0.09 4.37 2.00 0.03 0.03 1.12 1.15 0.03 0.31 0.34 — 3,961 3,961 0.14 0.56 4.31 4,136 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.63 0.55 0.63 8.17 0.00 0.00 2.11 2.11 0.00 0.49 0.49 — 1,857 1,857 0.02 0.07 2.38 1,881 Vendor 0.05 0.02 0.80 0.37 0.01 0.01 0.21 0.21 0.01 0.06 0.06 — 656 656 0.02 0.09 0.71 685 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.19. Building Construction (2029) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 30 / 68
Off-Road
Equipment
1.15 0.97 8.58 12.9 0.02 0.28— 0.28 0.25— 0.25— 2,397 2,397 0.10 0.02— 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
——————————————————
Off-Road
Equipment
1.15 0.97 8.58 12.9 0.02 0.28— 0.28 0.25— 0.25— 2,397 2,397 0.10 0.02— 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
——————————————————
Off-Road
Equipment
0.82 0.69 6.13 9.22 0.02 0.20— 0.20 0.18— 0.18— 1,712 1,712 0.07 0.01— 1,718 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Annual——————————————————
Off-Road
Equipment
0.15 0.13 1.12 1.68 < 0.005 0.04— 0.04 0.03— 0.03— 283 283 0.01 < 0.005— 284 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Offsite——————————————————
Daily,
Summer
(Max)
——————————————————
Worker 4.69 4.10 3.71 65.8 0.00 0.00 16.3 16.3 0.00 3.82 3.82— 15,999 15,999 0.16 0.59 41.5 16,220 Vendor 0.37 0.13 5.53 2.67 0.04 0.04 1.58 1.63 0.04 0.44 0.48— 5,382 5,382 0.19 0.78 13.2 5,632 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00— 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
——————————————————
Worker 4.12 4.04 4.28 55.7 0.00 0.00 16.3 16.3 0.00 3.82 3.82— 15,170 15,170 0.19 0.59 1.08 15,352 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 31 / 68
Vendor 0.36 0.12 5.79 2.73 0.04 0.04 1.58 1.63 0.04 0.44 0.48 — 5,386 5,386 0.19 0.78 0.34 5,624 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 2.93 2.87 3.05 41.7 0.00 0.00 11.5 11.5 0.00 2.70 2.70 — 10,995 10,995 0.14 0.42 12.8 11,138 Vendor 0.26 0.09 4.16 1.93 0.03 0.03 1.12 1.15 0.03 0.31 0.34 — 3,846 3,846 0.14 0.56 4.06 4,019 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.53 0.52 0.56 7.62 0.00 0.00 2.10 2.10 0.00 0.49 0.49 — 1,820 1,820 0.02 0.07 2.12 1,844 Vendor 0.05 0.02 0.76 0.35 0.01 0.01 0.20 0.21 0.01 0.06 0.06 — 637 637 0.02 0.09 0.67 665 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.21. Building Construction (2030) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.12 0.94 8.39 12.9 0.02 0.26 — 0.26 0.24 — 0.24 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.12 0.94 8.39 12.9 0.02 0.26 — 0.26 0.24 — 0.24 — 2,397 2,397 0.10 0.02 — 2,405 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 32 / 68
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.22 0.19 1.68 2.57 < 0.005 0.05 — 0.05 0.05 — 0.05 — 478 478 0.02 < 0.005 — 480 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.04 0.03 0.31 0.47 < 0.005 0.01 — 0.01 0.01 — 0.01 — 79.2 79.2 < 0.005 < 0.005 — 79.5 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 4.01 3.93 3.18 61.8 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 15,739 15,739 0.16 0.59 36.9 15,956 Vendor 0.32 0.12 5.30 2.57 0.04 0.04 1.58 1.63 0.04 0.44 0.48 — 5,225 5,225 0.19 0.74 12.4 5,461 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 3.96 3.88 3.74 52.1 0.00 0.00 16.3 16.3 0.00 3.82 3.82 — 14,925 14,925 0.16 0.59 0.96 15,107 Vendor 0.32 0.12 5.55 2.63 0.04 0.04 1.58 1.63 0.04 0.44 0.48 — 5,228 5,228 0.19 0.74 0.32 5,453 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.78 0.77 0.75 10.9 0.00 0.00 3.22 3.22 0.00 0.75 0.75 — 3,023 3,023 0.03 0.12 3.18 3,062 Vendor 0.06 0.02 1.11 0.52 0.01 0.01 0.31 0.32 0.01 0.09 0.09 — 1,043 1,043 0.04 0.15 1.07 1,089 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.14 0.14 0.14 2.00 0.00 0.00 0.59 0.59 0.00 0.14 0.14 — 500 500 0.01 0.02 0.53 507 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 33 / 68
Vendor 0.01 < 0.005 0.20 0.09 < 0.005 < 0.005 0.06 0.06 < 0.005 0.02 0.02 — 173 173 0.01 0.02 0.18 180 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.23. Paving (2030) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.77 0.64 6.28 9.90 0.01 0.22 — 0.22 0.20 — 0.20 — 1,511 1,511 0.06 0.01 — 1,516 Paving — 0.00 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.23 0.19 1.89 2.98 < 0.005 0.07 — 0.07 0.06 — 0.06 — 455 455 0.02 < 0.005 — 457 Paving — 0.00 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.04 0.04 0.35 0.54 < 0.005 0.01 — 0.01 0.01 — 0.01 — 75.4 75.4 < 0.005 < 0.005 — 75.6 Paving — 0.00 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 34 / 68
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05 0.05 0.04 0.74 0.00 0.00 0.20 0.20 0.00 0.05 0.05 — 189 189 < 0.005 0.01 0.44 192 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.20 0.00 0.00 0.06 0.06 0.00 0.01 0.01 — 54.9 54.9 < 0.005 < 0.005 0.06 55.6 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.04 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.09 9.09 < 0.005 < 0.005 0.01 9.21 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.25. Architectural Coating (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.14 0.11 0.83 1.13 < 0.005 0.02 — 0.02 0.02 — 0.02 — 134 134 0.01 < 0.005 — 134 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 35 / 68
Architect — 12.1 — — — — — — — — — — — — — — — —
ural
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.14 0.11 0.83 1.13 < 0.005 0.02 — 0.02 0.02 — 0.02 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coatings
— 12.1 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.10 0.08 0.59 0.80 < 0.005 0.01 — 0.01 0.01 — 0.01 — 95.4 95.4 < 0.005 < 0.005 — 95.7 Architect
ural
Coatings
— 8.67 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.02 0.01 0.11 0.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 15.8 15.8 < 0.005 < 0.005 — 15.8 Architect
ural
Coatings
— 1.58 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 36 / 68
Worker 1.00 0.89 0.86 15.0 0.00 0.00 3.26 3.26 0.00 0.76 0.76 — 3,314 3,314 0.14 0.12 10.3 3,364 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.99 0.87 1.07 12.7 0.00 0.00 3.26 3.26 0.00 0.76 0.76 — 3,142 3,142 0.04 0.12 0.27 3,179 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.71 0.62 0.77 9.53 0.00 0.00 2.30 2.30 0.00 0.54 0.54 — 2,278 2,278 0.03 0.08 3.18 2,307 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.13 0.11 0.14 1.74 0.00 0.00 0.42 0.42 0.00 0.10 0.10 — 377 377 0.01 0.01 0.53 382 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.27. Architectural Coating (2028) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.13 0.11 0.81 1.12 < 0.005 0.02 — 0.02 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 37 / 68
Architect — 12.1 — — — — — — — — — — — — — — — —
ural
Coatings
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.13 0.11 0.81 1.12 < 0.005 0.02 — 0.02 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coatings
— 12.1 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.09 0.08 0.58 0.80 < 0.005 0.01 — 0.01 0.01 — 0.01 — 95.6 95.6 < 0.005 < 0.005 — 96.0 Architect
ural
Coatings
— 8.70 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.02 0.01 0.11 0.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 15.8 15.8 < 0.005 < 0.005 — 15.9 Architect
ural
Coatings
— 1.59 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 38 / 68
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Worker 0.97 0.85 0.85 14.1 0.00 0.00 3.26 3.26 0.00 0.76 0.76 — 3,255 3,255 0.03 0.12 9.28 3,300 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.96 0.85 0.97 12.0 0.00 0.00 3.26 3.26 0.00 0.76 0.76 — 3,086 3,086 0.04 0.12 0.24 3,123 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.69 0.60 0.69 8.96 0.00 0.00 2.31 2.31 0.00 0.54 0.54 — 2,243 2,243 0.03 0.08 2.88 2,272 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.13 0.11 0.13 1.63 0.00 0.00 0.42 0.42 0.00 0.10 0.10 — 371 371 < 0.005 0.01 0.48 376 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.29. Architectural Coating (2029) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 39 / 68
Off-Road 0.12 0.10 0.79 1.11 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Equipment
Architect
ural
Coatings
— 12.1 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.12 0.10 0.79 1.11 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coatings
— 12.1 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.09 0.07 0.57 0.79 < 0.005 0.01 — 0.01 0.01 — 0.01 — 95.4 95.4 < 0.005 < 0.005 — 95.7 Architect
ural
Coatings
— 8.67 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.02 0.01 0.10 0.14 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 15.8 15.8 < 0.005 < 0.005 — 15.8 Architect
ural
Coatings
— 1.58 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 40 / 68
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.94 0.82 0.74 13.2 0.00 0.00 3.26 3.26 0.00 0.76 0.76 — 3,200 3,200 0.03 0.12 8.31 3,244 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.82 0.81 0.86 11.1 0.00 0.00 3.26 3.26 0.00 0.76 0.76 — 3,034 3,034 0.04 0.12 0.22 3,070 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.59 0.57 0.61 8.35 0.00 0.00 2.30 2.30 0.00 0.54 0.54 — 2,199 2,199 0.03 0.08 2.57 2,228 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.11 0.10 0.11 1.52 0.00 0.00 0.42 0.42 0.00 0.10 0.10 — 364 364 < 0.005 0.01 0.42 369 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.31. Architectural Coating (2030) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 41 / 68
Off-Road 0.12 0.10 0.78 1.11 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Equipment
Architect
ural
Coatings
— 12.1 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.12 0.10 0.78 1.11 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect
ural
Coatings
— 12.1 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.02 0.02 0.16 0.23 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 27.4 27.4 < 0.005 < 0.005 — 27.5 Architect
ural
Coatings
— 2.50 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.03 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.54 4.54 < 0.005 < 0.005 — 4.56 Architect
ural
Coatings
— 0.46 — — — — — — — — — — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 42 / 68
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.80 0.79 0.64 12.4 0.00 0.00 3.26 3.26 0.00 0.76 0.76 — 3,148 3,148 0.03 0.12 7.39 3,191 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.79 0.78 0.75 10.4 0.00 0.00 3.26 3.26 0.00 0.76 0.76 — 2,985 2,985 0.03 0.12 0.19 3,021 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.16 0.16 0.15 2.25 0.00 0.00 0.66 0.66 0.00 0.16 0.16 — 622 622 0.01 0.02 0.65 630 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.41 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 103 103 < 0.005 < 0.005 0.11 104 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Mobile source emissions results are presented in Sections 2.6. No further detailed breakdown of emissions is available.
4.2. Energy
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 43 / 68
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 7,117 7,117 0.44 0.05 — 7,144
Apartme
nts
Low Rise
— — — — — — — — — — — — 2,236 2,236 0.14 0.02 — 2,244
Total — — — — — — — — — — — — 9,353 9,353 0.58 0.07 — 9,388 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 7,117 7,117 0.44 0.05 — 7,144
Apartme
nts
Low Rise
— — — — — — — — — — — — 2,236 2,236 0.14 0.02 — 2,244
Total — — — — — — — — — — — — 9,353 9,353 0.58 0.07 — 9,388 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — 1,178 1,178 0.07 0.01 — 1,183
Apartme
nts
Low Rise
— — — — — — — — — — — — 370 370 0.02 < 0.005 — 372
Total — — — — — — — — — — — — 1,548 1,548 0.10 0.01 — 1,554 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 44 / 68
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.44 0.22 3.74 1.59 0.02 0.30 — 0.30 0.30 — 0.30 — 4,741 4,741 0.42 0.01 — 4,755 Apartme
nts
Low Rise
0.19 0.10 1.65 0.70 0.01 0.13 — 0.13 0.13 — 0.13 — 2,090 2,090 0.18 < 0.005 — 2,096 Total 0.63 0.31 5.38 2.29 0.03 0.44 — 0.44 0.44 — 0.44 — 6,832 6,832 0.60 0.01 — 6,851 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.44 0.22 3.74 1.59 0.02 0.30 — 0.30 0.30 — 0.30 — 4,741 4,741 0.42 0.01 — 4,755 Apartme
nts
Low Rise
0.19 0.10 1.65 0.70 0.01 0.13 — 0.13 0.13 — 0.13 — 2,090 2,090 0.18 < 0.005 — 2,096 Total 0.63 0.31 5.38 2.29 0.03 0.44 — 0.44 0.44 — 0.44 — 6,832 6,832 0.60 0.01 — 6,851 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
0.08 0.04 0.68 0.29 < 0.005 0.06 — 0.06 0.06 — 0.06 — 785 785 0.07 < 0.005 — 787 Apartme
nts
Low Rise
0.04 0.02 0.30 0.13 < 0.005 0.02 — 0.02 0.02 — 0.02 — 346 346 0.03 < 0.005 — 347 Total 0.11 0.06 0.98 0.42 0.01 0.08 — 0.08 0.08 — 0.08 — 1,131 1,131 0.10 < 0.005 — 1,134 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 45 / 68
4.3. Area Emissions by Source
4.3.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 3.52 1.76 30.1 12.8 0.19 2.43 — 2.43 2.43 — 2.43 0.00 38,157 38,157 0.72 0.07 — 38,197 Consum
er
Products
— 37.6 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 2.85 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt
9.00 8.52 0.92 98.5 < 0.005 0.03 — 0.03 0.05 — 0.05 — 263 263 0.01 0.02 — 270 Total 12.5 50.8 31.0 111 0.20 2.46 — 2.46 2.48 — 2.48 0.00 38,420 38,420 0.73 0.10 — 38,467 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 3.52 1.76 30.1 12.8 0.19 2.43 — 2.43 2.43 — 2.43 0.00 38,157 38,157 0.72 0.07 — 38,197 Consum
er
Products
— 37.6 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 2.85 — — — — — — — — — — — — — — — —
Total 3.52 42.2 30.1 12.8 0.19 2.43 — 2.43 2.43 — 2.43 0.00 38,157 38,157 0.72 0.07 — 38,197 Annual — — — — — — — — — — — — — — — — — —
Hearths 0.04 0.02 0.38 0.16 < 0.005 0.03 — 0.03 0.03 — 0.03 0.00 433 433 0.01 < 0.005 — 433 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 46 / 68
Consum
Products
— 6.87 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.52 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt
1.13 1.07 0.12 12.3 < 0.005 < 0.005 — < 0.005 0.01 — 0.01 — 29.8 29.8 < 0.005 < 0.005 — 30.6 Total 1.17 8.48 0.49 12.5 < 0.005 0.03 — 0.03 0.04 — 0.04 0.00 462 462 0.01 < 0.005 — 464
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 106 493 599 0.40 0.24 — 679
Apartme
nts
Low Rise
— — — — — — — — — — — 31.9 148 180 0.12 0.07 — 204
Total — — — — — — — — — — — 138 641 778 0.51 0.31 — 883 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 106 493 599 0.40 0.24 — 679
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 47 / 68
Apartme — — — — — — — — — — — 31.9 148 180 0.12 0.07 — 204 nts
Total — — — — — — — — — — — 138 641 778 0.51 0.31 — 883 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 17.6 81.6 99.1 0.07 0.04 — 112
Apartme
nts
Low Rise
— — — — — — — — — — — 5.28 24.5 29.8 0.02 0.01 — 33.7
Total — — — — — — — — — — — 22.8 106 129 0.09 0.05 — 146
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 665 0.00 665 66.5 0.00 — 2,328
Apartme
nts
Low Rise
— — — — — — — — — — — 200 0.00 200 20.0 0.00 — 699
Total — — — — — — — — — — — 865 0.00 865 86.5 0.00 — 3,027 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 48 / 68
Apartme — — — — — — — — — — — 665 0.00 665 66.5 0.00 — 2,328 nts
Mid Rise
Apartme
nts
Low Rise
— — — — — — — — — — — 200 0.00 200 20.0 0.00 — 699
Total — — — — — — — — — — — 865 0.00 865 86.5 0.00 — 3,027 Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — 110 0.00 110 11.0 0.00 — 385
Apartme
nts
Low Rise
— — — — — — — — — — — 33.1 0.00 33.1 3.31 0.00 — 116
Total — — — — — — — — — — — 143 0.00 143 14.3 0.00 — 501
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 9.16 9.16
Apartme
nts
Low Rise
— — — — — — — — — — — — — — — — 3.44 3.44
Total — — — — — — — — — — — — — — — — 12.6 12.6
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 49 / 68
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 9.16 9.16
Apartme
nts
Low Rise
— — — — — — — — — — — — — — — — 3.44 3.44
Total — — — — — — — — — — — — — — — — 12.6 12.6
Annual — — — — — — — — — — — — — — — — — —
Apartme
nts
Mid Rise
— — — — — — — — — — — — — — — — 1.52 1.52
Apartme
nts
Low Rise
— — — — — — — — — — — — — — — — 0.57 0.57
Total — — — — — — — — — — — — — — — — 2.09 2.09
4.7. Offroad Emissions By Equipment Type
4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 50 / 68
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.8. Stationary Emissions By Equipment Type
4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.9. User Defined Emissions By Equipment Type
4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 51 / 68
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 52 / 68
Land TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Use
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 53 / 68
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 2/14/2023 7/4/2023 5.00 100 —
Site Preparation Site Preparation 7/5/2023 9/27/2023 5.00 60.0 — Grading Grading 9/28/2023 5/2/2024 5.00 155 —
Building Construction Building Construction 5/3/2024 4/12/2030 5.00 1,550 — Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 54 / 68
Paving Paving 4/13/2030 9/14/2030 5.00 110 —
Architectural Coating Architectural Coating 1/1/2027 4/15/2030 5.00 857 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Rubber Tired Dozers Diesel Average 2.00 8.00 367 0.40 Demolition Excavators Diesel Average 3.00 8.00 36.0 0.38 Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Site Preparation Rubber Tired Dozers Diesel Average 3.00 8.00 367 0.40 Site Preparation Tractors/Loaders/Backh
oes
Diesel Average 4.00 8.00 84.0 0.37
Grading Graders Diesel Average 1.00 8.00 148 0.41
Grading Excavators Diesel Average 2.00 8.00 36.0 0.38
Grading Tractors/Loaders/Backh
oes
Diesel Average 2.00 8.00 84.0 0.37
Grading Scrapers Diesel Average 2.00 8.00 423 0.48
Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Building Construction Forklifts Diesel Average 3.00 8.00 82.0 0.20 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Cranes Diesel Average 1.00 7.00 367 0.29 Building Construction Welders Diesel Average 1.00 8.00 46.0 0.45 Building Construction Tractors/Loaders/Backh
oes
Diesel Average 3.00 7.00 84.0 0.37
Paving Pavers Diesel Average 2.00 8.00 81.0 0.42
Paving Paving Equipment Diesel Average 2.00 8.00 89.0 0.36 Paving Rollers Diesel Average 2.00 8.00 36.0 0.38
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 55 / 68
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 15.0 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 0.00 20.0 HHDT
Demolition Onsite truck — — HHDT
Site Preparation — — — —
Site Preparation Worker 17.5 18.5 LDA,LDT1,LDT2
Site Preparation Vendor — 10.2 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 20.0 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 1,247 18.5 LDA,LDT1,LDT2
Building Construction Vendor 185 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Paving — — — —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 56 / 68
Paving Worker 15.0 18.5 LDA,LDT1,LDT2
Paving Vendor — 10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
Architectural Coating — — — —
Architectural Coating Worker 249 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area Coated
(sq ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 3,367,008 1,122,336 0.00 0.00 —
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Demolition 0.00 0.00 0.00 — —
Site Preparation — — 90.0 0.00 —
Grading — — 465 0.00 —
Paving 0.00 0.00 0.00 0.00 0.00
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 57 / 68
5.6.2. Construction Earthmoving Control Strategies
Non-applicable. No control strategies activated by user.
5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Apartments Mid Rise — 0%
Apartments Low Rise — 0%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2023 0.00 532 0.03 < 0.005
2024 0.00 532 0.03 < 0.005
2025 0.00 532 0.03 < 0.005
2026 0.00 532 0.03 < 0.005
2027 0.00 532 0.03 < 0.005
2028 0.00 532 0.03 < 0.005
2029 0.00 532 0.03 < 0.005
2030 0.00 532 0.03 < 0.005
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Total all Land Uses 26.7 26.7 26.7 9,762 259 259 259 94,393 Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 58 / 68
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Apartments Mid Rise —
Wood Fireplaces 0
Gas Fireplaces 1472
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 173
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0
Apartments Low Rise —
Wood Fireplaces 0
Gas Fireplaces 340
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 40
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 59 / 68
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
3367008 1,122,336 0.00 0.00 —
5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Apartments Mid Rise 4,882,891 532 0.0330 0.0040 14,794,315 Apartments Low Rise 1,534,018 532 0.0330 0.0040 6,522,270
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Apartments Mid Rise 49,648,702 0.00
Single Family Housing 14,909,520 0.00
5.13. Operational Waste Generation
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 60 / 68
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Apartments Mid Rise 333 0.00
Apartments Low Rise 99.9 0.00
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Apartments Mid Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Apartments Mid Rise Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00
Apartments Low Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Apartments Low Rise Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00
5.15. Operational Off-Road Equipment
5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
5.16. Stationary Sources
5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 61 / 68
5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr)
5.17. User Defined
Equipment Type Fuel Type
— —
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 62 / 68
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 13.1 annual days of extreme heat Extreme Precipitation 4.85 annual days with precipitation above 20 mm Sea Level Rise 0.00 meters of inundation depth
Wildfire 0.00 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider different increments of sea level rise coupled with extreme storm events. Users may select from four model simulations to view the range in potential inundation depth for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 50 meters (m) by 50 m, or about 164 feet (ft) by 164 ft.
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 63 / 68
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 59.7
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 64 / 68
AQ-PM 83.6
AQ-DPM 65.4
Drinking Water 56.2
Lead Risk Housing 90.6
Pesticides 0.00
Toxic Releases 84.5
Traffic 52.4
Effect Indicators —
CleanUp Sites 7.71
Groundwater 59.6
Haz Waste Facilities/Generators 20.3
Impaired Water Bodies 33.2
Solid Waste 11.6
Sensitive Population —
Asthma 66.1
Cardio-vascular 87.8
Low Birth Weights 33.1
Socioeconomic Factor Indicators —
Education 75.7
Housing 59.7
Linguistic 54.6
Poverty 51.2
Unemployment 72.5
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 65 / 68
Economic —
Above Poverty 47.27319389
Employed 40.16424997
Median HI 49.22366226
Education —
Bachelor's or higher 20.73655845
High school enrollment 100
Preschool enrollment 72.83459515
Transportation —
Auto Access 23.89323752
Active commuting 49.17233415
Social —
2-parent households 45.78467856
Voting 31.79776723
Neighborhood —
Alcohol availability 41.8324137
Park access 52.31618119
Retail density 83.19004235
Supermarket access 67.93276017
Tree canopy 41.55010907
Housing —
Homeownership 77.96740665
Housing habitability 44.12934685
Low-inc homeowner severe housing cost burden 19.72282818 Low-inc renter severe housing cost burden 56.70473502
Uncrowded housing 14.10239959
Health Outcomes —
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 66 / 68
Insured adults 21.95560118
Arthritis 0.0
Asthma ER Admissions 27.3
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 47.4
Cognitively Disabled 64.4
Physically Disabled 69.8
Heart Attack ER Admissions 4.5
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 88.3
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 15.5
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 67 / 68
Elderly 53.1
English Speaking 55.6
Foreign-born 61.4
Outdoor Workers 39.5
Climate Change Adaptive Capacity —
Impervious Surface Cover 33.7
Traffic Density 46.6
Traffic Access 23.0
Other Indices —
Hardship 72.0
Other Decision Support —
2016 Voting 39.3
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 74.0 Healthy Places Index Score for Project Location (b) 42.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) Yes Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
Pico Rivera Zone Code Amendments and Zone Reclassification Project Detailed Report, 2/24/2023 68 / 68
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
Screen Justification
Land Use City identified parcels with a total acreage of 91.7 acres, and estimated a population increase of 6,171 new residents. ADUs were conservatively assumed as single-family housing and acreage was determined using the maximum State allowed ADU sf of 1,200sf (0.03ac) times 400 units to get 12 acres.
Construction: Construction Phases Default construction, assumes architectural coating occurs simultaneously as building construction Construction: Architectural Coatings Pursuant to SCAQMD Rule 1113 Operations: Hearths Pursuant to SCAQMD Rule 445, no wood burning devices Operations: Architectural Coatings Pursuant to SCAQMD Rule 1113 Operations: Water and Waste Water Wastewater treatment plant 100% aerobic Appendix B
VMT Analysis
translutions, inc.
17632 Irvine Boulevard, Suite 200,
Tustin, California 92780
Phone (949)656-3131 Fax (949)445-3131
solutions @ translutions.com
the transportation solutions company...
February 8, 2023
Mr. Michael Rocque, MS, Senior Planner
Rincon Consultants, Inc.
2215 Faraday Ave Suite A,
Carlsbad, CA 92008
(via email)
Subject: VMT Analysis for the City of Pico Rivera 6th Cycle Housing Element Code Amendments Dear Michael:
Translutions, Inc. (Translutions) is pleased to provide this letter discussing the Vehicle Miles Traveled (VMT) analysis for the proposed Housing Element Code Amendments for the City of Pico Rivera (the Project). This analysis is consistent with the requirements for a VMT analysis established by the State of California to evaluate impacts to transportation under CEQA. Since this is a housing element update, this memorandum evaluates the change in VMT per Service Population under “without” and “with” project conditions. The VMT analysis for the project was conducted using year 2020 and 2040 data sets from the 2016 Southern California Association of Governments Regional Transportation Plan/Sustainable Communities Strategies (SCAG RTP/SCS) travel model (model).
PROJECT DESCRIPTION
The Housing Element is required to demonstrate the City’s capacity to plan for its share of housing growth. The City’s share of housing is determined by the Southern California Association of Governments (SCAG) via the Regional Housing Needs Assessments (RHNA).
The RHNA is the number of units that a city is required to plan for (not develop) by identifying sites throughout the City. For the 2021- 2029 Housing Element planning period, SCAG assigned the City 1,024 units. After the acreage calculations, 1,333 units were identified by the City. The area wise breakdown and number of units are included in Attachment A.
ANALYSIS METHODOLOGY
MODELING YEARS (2020 AND 2040)
The SCAG RTP/SCS model’s base year is 2016 and horizon year is 2040. However, based on discussions with the City, the proposed analysis was conducted for years 2020 and 2040. The model includes a 2020 dataset from SCAG which was used for the analysis.
MODELING METHODOLOGY
The SCAG RTP model uses a two-tier traffic analysis zone (TAZ) system – Tier 1 zones and Tier 2 zones. Two or more Tier 2 zones make up a Tier 1 zone. The model utilizes Tier 2 zone system for modeling steps such as trip generation, trip distribution, and mode choice while it uses Tier 1 zone system for assignment purposes. Given the inability to perform zone splits in the SCAG RTP model and based on how the guidelines require evaluation of plans and programs, the additive method was used for the analysis. Under this method, project related SED was added to the existing (or future) SED of the TAZs to evaluate with project VMT.
MODEL SOCIOECONOMIC DATA
The model consists of both residential (households and population) and non-residential land uses (employment by type/category) as inputs. For households, the travel model uses household characteristics such as household income, household size, and household workers etc., to determine the household travel patterns. The number of households by dwelling unit type were based on the Project information provided by the City. Further, based on discussions with the City, to account for multiple families living in the same unit, 400 additional households were included . Therefore, this evaluation is based on 1,732 units.
The average household size from 2016 SCAG RTP/SCS model for each TAZ was maintained and carried over to the number of new dwelling units proposed as part of the Project. Table A shows the change in households and population that is forecast to occur at each 2/8/2023 (Q:\Rincon - Pico Rivera Housing Element\VMT Letter.docx) 2 the transportation solutions company...
TAZ because of the Project. As shown on Table A, the Project will result in an increase of 1,732 households which would translate into a population increase of 6,171.
Table A: Project Related Increase in Households and Population by TAZ Tier 2 TAZ Proposed HH Population
21795100 0 0
21795200 263 1,007
21795300 0 0
21795400 57 207
21801100 95 283
21801200 0 0
21804100 0 0
21804200 0 0
21804300 81 307
21804400 255 932
21804500 0 0
21806100 14 49
21806200 0 0
21820100 0 0
21820200 0 0
21820300 0 0
21820400 109 441
21821100 0 0
21821200 34 144
21821300 228 763
21823100 361 1,233
21826100 0 0
21826200 0 0
21826300 109 300
21835100 43 188
21835200 38 145
21848100 0 0
21848200 0 0
21848300 46 171
21848400 0 0
Total 1,732 6,171
MODEL RUNS AND OUTPUTS
Model Runs were conducted for the 2020 and 2040 conditions for both without project and with project conditions with the above discussed SED and networks. Consistent to standard modeling practice, each model was run with conditions that at least 5-loops1 be run or until a convergence of 0.01 (i.e., 1.0%) is achieved. Detailed model outputs are shown in Attachment B.
VMT SIGNIFICANT IMPACT THRESHOLDS & RESULTS
For General Plans and Specific Plans, the following would result in a significant project generated VMT:
1. The baseline project generated VMT per service population exceeds the baseline VMT per service population (VMT/SP) for the City, or
1 Models are run with feedback loops wherein the output of one run is becomes the basis of the next run. In this process, the predicted speeds are used to re-compute highway and transit travel times, and the entire model sequence is repeated until input and output speeds are generally consistent with each other. Each iteration is referred to as a loop. The percentage change in total travel cost between one iteration and the next is referred to as “convergence”. A convergence of 0.01 means that the change in travel cost between one run and the next is 1%. Models in the SCAG region are generally run for 5 loops or a convergence of 0.01. 2/8/2023 (Q:\Rincon - Pico Rivera Housing Element\VMT Letter.docx) 3 the transportation solutions company...
2. The cumulative project generated VMT per service population exceeds the future year VMT per service population (VMT/SP) for the City.
Baseline (2020) plus Project Conditions
Table B shows the model outputs for the baseline (2020) conditions as well as the plus project conditions.
Table B: Year 2020 VMT Outputs
City of Pico Rivera 2020 No
Project
2020 With
Project
Net New
Project2
Population 55,019 61,190 6,171
Socio-Economic Data Employment 19,507 19,507 -
Service Population 74,526 80,697 6,171
Total Vehicle Trips (No Trucks) 218,030 228,049 10,019
Automobiles Only Total Vehicle VMT (No Trucks) 2,278,843 2,374,761 95,918 Average Vehicle Trip Distance (No Trucks) 10.45 10.41 9.57 Total Truck Trips 8,373 8,569 196
Trucks Only Total Truck VMT 184,064 186,907 2,844
Average Truck Trip Distance 21.98 21.81 14.53
Total Vehicle Trips (Include Trucks) 226,403 236,619 10,215 All Vehicles Total VMT (Include Trucks) 2,462,907 2,561,668 98,761 Total VMT Per Service Population (Include Trucks) 10.88 10.83 9.67 As shown in Table B, the baseline (2020) plus project VMT/SP is 10.83 miles while the without project VMT/SP is 10.88 miles. The project related VMT/SP is 9.67, which is significantly less than the baseline VMT/SP for the City. Therefore, the project has a less than significant VMT impact under baseline conditions.
Year 2040 plus Project Conditions
Table C shows the model outputs for the year 2040 conditions as well as the plus project conditions.
Table C: Year 2040 VMT Outputs
City of Pico Rivera 2040 No
Project
2040 With
Project Net New Project
Population 59,319 65,490 6,171
Socio-Economic Data Employment 21,301 21,301 -
Service Population 80,620 86,791 6,171
Total Vehicle Trips (No Trucks) 217,642 227,312 9,670
Automobiles Only Total Vehicle VMT (No Trucks) 2,298,403 2,391,268 92,865 Average Vehicle Trip Distance (No Trucks) 10.56 10.52 9.60 Total Truck Trips 9,431 9,524 92
Trucks Only Total Truck VMT 266,567 268,095 1,528
Average Truck Trip Distance 28.26 28.15 16.53
Total Vehicle Trips (Include Trucks) 227,073 236,836 9,762 All Vehicles Total VMT (Include Trucks) 2,564,970 2,659,363 94,393 Total VMT Per Service Population (Include Trucks) 11.30 11.23 9.67 As shown in Table C, the year 2040 plus project VMT/SP is 11.23 miles while the without project VMT/SP is 11.30 miles. The project related VMT/SP is forecast to be 9.67, which is significantly less than the baseline VMT/SP for the City. Therefore, the project VMT per 2 The average vehicle trip distances are not the trip lengths generated by the net new development directly, but the effect on vehicle trip and VMT for the whole project area. The effect of adding more housing to the study area will reduce trip length on average. In order to compute the average vehicle distance, the net new VMT should be divided by the net new vehicle trips, but this should not be interpreted to mean that the new development will have markedly different patterns than the existing development; rather the effects on travel of adding housing will be to bring everyone’s average down (including existing uses). 2/8/2023 (Q:\Rincon - Pico Rivera Housing Element\VMT Letter.docx) 4 the transportation solutions company...
service population is less than the VMT/SP under without project conditions and therefore, the project has a less than significant VMT impact under baseline conditions.
FINDINGS & CONCLUSION
The results of the VMT analysis shows that the project related VMT/SP is lower than the VMT/SP for the City. In fact, the Project reduces the Citywide VMT/SP under both analysis conditions. Therefore, the Project has a less than significant impact under both the baseline and future year conditions.
We hope you will find this information helpful. Should you have any questions, please don’t hesitate to call me at (949) 656-3131.
Sincerely,
translutions, Inc.
Sandipan Bhattacharjee, P.E., T.E., AICP, ENV SP
Principal
Exp. 03-31-24
No. 2847
TRAFFIC
STATE OF CALIFORNIA
Appendix B: Candidate Sites Analysis Page B‐15
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes 1 5272‐004‐035 C‐C C ‐ Commercial R40‐OV 0.62 0.62 8540 BEVERLY BLVD
PACE PHILLIP J
AND PHYLLIS M
TRS PACE FAMILY
TRUST
35 0.35 0 7 1 2 4 ‐ ‐
The corner property is the site of a paved
vacant lot. Adjacent uses include single‐family
residences.
2 5272‐005‐012 C‐C C ‐ Commercial R40‐OV 0.68 0.68 8642 BEVERLY BLVD
PACE PHILLIP J
AND PHYLLIS M
TRS PACE FAMILY
TRUST
35 0.35 0 8 1 2 5 2,396.0 27,126.7
The property is the site of a paved vacant lot
with 2 structures. Adjacent uses include a 7‐
Eleven and surface parking, single‐family
residences, and a large vacant lot.
3 5272‐005‐045 C‐C C ‐ Commercial R40‐OV 0.43 0.43 8554 BEVERLY BLVD
PACE PHILLIP J
AND PHYLIS M TRS
PACE FAMILY
TRUST
35 0.35 0 5 1 1 3 5,278.7 13,247.0
The corner property is the site of 2 vacant
structures and a large surface parking lot.
Adjacent uses include a large vacant lot and
single‐family residences.
4 5272‐017‐019 (1) C‐G C ‐ Commercial R40‐OV 0.90 0.90 4335 ROSEMEAD BLVD DUS SAMARTHA REAL ESTATE LLC 35 0.35 0 10 2 3 5 13,055.5 25,940.1 The property is the site of the Epic Hotel, an
older hotel with some recent improvements
and large surface parking lot. Adjacent uses
include single‐ and multi‐family residences, a
gas station, a dry cleaning business, and small
restaurant.
5 5272‐018‐900 P‐F PF ‐ Public Facility R40‐OV 5.51 5.51 IBSEN ST
EL RANCHO
UNIFIED
CONSOLIDATED
SCHOOL DIST
35 1 0 192 38 57 97 35,989.6 203,826.8
The property is the site of Pio Pico
Elementary School which has been closed for
many years. Property consists of 9 permanent
structures, open play areas, large areas of
grass, and a large surface parking lot.
Adjacent uses include single‐family
residences and St. Francis Xavier Catholic
Church.
6 5272‐018‐901 S‐F PF ‐ Public Facility R40‐OV 0.12 0.12 IBSEN ST PICO RIVERA CITY 35 1 0 4 0 1 3 ‐ ‐ See 5272‐018‐900.7 5272‐018‐902 S‐F PF ‐ Public Facility R40‐OV 1.03 1.03 8736 IBSEN ST
EL RANCHO
UNIFIED
CONSOLIDATED
SCHOOL DIST
35 1 0 36 7 10 19 ‐ ‐ See 5272‐018‐900.
8 5272‐018‐903 S‐F PF ‐ Public Facility R40‐OV 1.03 1.03 8804 IBSEN ST
EL RANCHO
UNIFIED
CONSOLIDATED
SCHOOL DIST
35 1 0 36 7 10 19 ‐ ‐ See 5272‐018‐900.
Attachment A
Appendix B: Candidate Sites Analysis Page B‐16
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes 9 5272‐022‐024 (1) C‐G C ‐ Commercial R40‐OV 0.98 0.98 8923 BEVERLY BLVD DOERGES MARY E VICTOR L SLOAN DECD TRUST 35 0.35 0 12 2 3 7 ‐ ‐ The property is the site of a dry‐cleaning
business and a restaurant with a large surface
parking lot. Adjacent uses include single‐
family residences, smaller commercial
businesses, the Epic Hotel, and a gas station.
10 5272‐022‐025 (1) C‐G C ‐ Commercial R40‐OV 0.61 0.61 8957 BEVERLY BLVD
TOGOOD JOYCE A
COSTRUSTEE ET AL
JOYCE A TOGOOD
TRUST
35 0.35 0 7 1 2 4 ‐ ‐
The corner property is the site of a Mobile
gas station. Adjacent uses include the Epic
Hotel, a dry‐cleaning business, and a small
restaurant.
11 5272‐023‐017 (1) C‐G C ‐ Commercial R40‐OV 0.57 0.57 8922 BEVERLY BLVD FARMERS AND GROWERS PLAZA LLC 35 0.35 0 6 1 1 4 12,836.6 12,018.4 The property is the site of a small strip mall
consisting of different businesses with a large
surface parking lot. Adjacent uses include a
strip mall, auto repair shop, and single‐family
residences.
12 5272‐023‐024 (1) (2) C‐G C ‐ Commercial R40‐OV 0.43 0.43 8914 BEVERLY BLVD ALMAGOR FREDERIC D ALMAGOR TRUST 35 0.35 0 5 1 1 3 2,543.4 15,959.3 This property is the site of an auto repair shop with a surface parking lot for vehicle storage. Adjacent uses include a grocery store and single‐family residences.13 5272‐023‐027 (1) C‐G C ‐ Commercial R40‐OV 0.64 0.64 8924 BEVERLY BLVD FARMERS AND GROWERS PLAZA LLC 35 0.35 0 7 1 2 4 10,295.4 17,652.2 The property is the site of a small strip mall
consisting of different businesses with a large
surface parking lot. Adjacent uses include a
grocery store, a U‐Haul rental business, and
single‐family residences.
14 5272‐023‐030 (2) C‐G C ‐ Commercial R40‐OV 0.26 0.26 4425 ROSEMEAD BLVD U HAUL REAL ESTATE CO 35 0.35 0 3 0 0 3 ‐ ‐ The corner property is the site of a U Haul, a truck rental business. Adjacent uses include a strip mall and single‐family residences.15 5272‐023‐031 (2) C‐G C ‐ Commercial R40‐OV 0.66 0.66 4425 ROSEMEAD BLVD U HAUL REAL ESTATE CO 35 0.35 0 8 1 2 5 ‐ ‐ See 5272‐023‐030.16 5272‐029‐011 (1) C‐G C ‐ Commercial R40‐OV 0.72 0.72 4525 ROSEMEAD BLVD 4525 ROSEMEAD BLVD LLC 35 0.35 0 8 1 2 5 ‐ ‐ The property serves as the parking lot for the
auto repair business located at 4525
Rosemead Boulevard. Adjacent uses include
single‐family residences and a medical office.
17 5272‐030‐028 (2) C‐G C ‐ Commercial R40‐OV 0.72 0.72 4525 ROSEMEAD BLVD 4525 ROSEMEAD BLVD LLC 35 0.35 0 8 1 2 5 17,965.4 13,282.9 The property is the site of an auto body repair
business with a large surface parking lot
(5272‐029‐011). Adjacent uses include single‐
family residences and a small restaurant with
a drive‐thru and surface parking lot.
Attachment A
Appendix B: Candidate Sites Analysis Page B‐17
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes 18 6368‐005‐028 I‐G I ‐ General Industrial R40‐OV 0.56 0.56 7801 ROSEMEAD BLVD 7925 ROSEMEAD BLVD PICO 35 0.35 0 6 1 1 4 2,311.1 22,099.2 The corner property is the site of a tire and
auto body repair business, Capital Tire
Center, with a large surface parking lot.
Adjacent uses include a large truck yard/lot.
19 6368‐005‐042 I‐G I ‐ General Industrial R40‐OV 5.43 5.43 7925 ROSEMEAD BLVD 7925 ROSEMEAD BLVD PICO RIVERA 35 0.35 0 66 13 19 34 26,146.6 210,142.1 The property is the site of a large truck
yard/lot. Adjacent uses include Capital Tire
Center, An El Rancho Unified School District
Building and large surface parking lot, and
train tracks. Multi‐Family residences are
located across the street on Rosemead Blvd.
20 6369‐002‐012 I‐G I ‐ General Industrial R40‐OV 3.61 3.61 8340 WASHINGTON BLVD PUBLIC STORAGE INC 35 0.35 0 44 8 13 23 80,542.6 76,590.1 The property is the site of Public Storage, a
large storage facility with large surface
parking lot areas surrounding the two main
storage buildings. Adjacent uses include
distribution warehouses and undeveloped
open space. Multi‐family residences and a gas
station are located directly across the street
on Washington Blvd.
21 6370‐013‐014 (1) C‐G C ‐ Commercial R40‐OV 0.64 0.64 6605 ROSEMEAD BLVD PATEL RAJESH & ANJANA PEMA NILESH & RADHA 35 0.35 0 7 1 2 4 ‐ ‐ The property is the site of a large vacant lot in between a motel and residential care facility. Other adjacent uses include single‐family residences.22 6370‐013‐021 (1) C‐C C ‐ Commercial R40‐OV 0.77 0.77 6623 ROSEMEAD BLVD
PATEL HARISH D
AND SARDA H TRS
F C AND M K
TOMLINSON LLC
35 0.35 0 9 1 2 6 9,788.6 23,735.3
The property is the location of a motel built in
1961. Adjacent uses include a large vacant
lot, single‐family residences, and a
commercial strip mall center with a large
surface parking lot.
23 6370‐013‐032 C‐C C ‐ Commercial R40‐OV 0.72 0.72 6505 ROSEMEAD BLVD PICO RIVERA VILLAS LLC 35 0.35 0 8 1 2 5 6,721.7 24,779.1 This corner property serves as a location for
an office building. Adjacent uses include
single‐family residences and an Adult
Residential Facility.
24 6370‐022‐025 C‐C C ‐ Commercial R40‐OV 1.16 1.16 8605 WASHINGTON BLVD LAGUNA PROPERTIES LLC 35 0.35 0 14 2 4 8 14,308.5 36,047.4 The property is the site of a retail shoe store
with a large surface parking lot. The site is
surrounded by Phaeton Ave. and
Bollenbacher Dr. and a small access road
connecting the two. Nearby uses include
single‐family residences and a small strip mall
with a surface parking lot.
Attachment A
Appendix B: Candidate Sites Analysis Page B‐18
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes 25 6370‐024‐033 (1) C‐G C ‐ Commercial R40‐OV 0.63 0.63 8701 WASHINGTON BLVD HOULE DIANE N JASIN CO TR R AND D HOULE TRUST 35 0.35 0 7 1 2 4 11,987.5 15,427.3 The property is the site of a small strip mall consisting of different businesses with a large surface parking lot. Adjacent uses include multi‐ and single‐family residences, and a Wells Fargo with a drive‐thru.26 6370‐025‐009 (1) C‐G C ‐ Commercial R40‐OV 0.87 0.87 8737 WASHINGTON BLVD UNITED CALIF BK REALTY CORP 35 0.35 0 10 2 3 5 8,131.1 29,846.2 The property is the site of a Wells Fargo Bank
with a drive‐thru and large surface parking
lot. Adjacent uses include a small strip mall
with a surface parking lot, multi‐ and single‐
family residences, and surface parking for El
Rodeo De Pico Rivera restaurant and
nightclub.
27 6370‐027‐014 (1) C‐G C ‐ Commercial R40‐OV 0.58 0.58 8809 WASHINGTON BLVD UNITED CALIF BK REALTY CORP 35 0.35 0 7 1 2 4 ‐ ‐ The property is the site of a large surface parking lot for Wells Fargo Bank. See 6370‐ 025‐009.28 6370‐027‐018 (1) C‐G C ‐ Commercial R40‐OV 2.85 2.85 8825 WASHINGTON BLVD MERCURY BOWL LLC AND GREEN RIVERA LLC 35 0.35 0 34 6 10 18 35,456.1 88,562.6 The property is the site of El Rodeo De Pico
Rivera restaurant/nightclub and large surface
parking lot space. Adjacent uses include LA
Fitness gym, surface parking for Pico Rivera
Marketplace, parking for Wells Fargo Bank,
and single‐family residences.
29 6370‐027‐021 C‐G C ‐ Commercial R40‐OV 8.22 8.22 8913 WASHINGTON BLVD PICO RIVERA HOLDINGS LVT LLC FRESH AND EASY MARKET LESSEE 35 0.35 0 100 20 30 50 89,357.7 268,696.0 Pico Rivera Marketplace. The property is the
site of an LA Fitness gym, retail stores, and
restaurants with a large surface parking lot.
The property has 6 separate structures.
Adjacent uses include a Wienerschnitzel fast
food restaurant, El Rodeo De Pico Rivera and
its surface parking, as well as single‐family
residences.
30 6371‐001‐026 (1) C‐G C ‐ Commercial R40‐OV 2.65 2.65 6101 ROSEMEAD BLVD 6003 DE LLC ET AL
PARK PLAZA
SHOPPING
CENTRE DE LL
35 0.35 0 32 6 9 17 31,297.6 84,009.6
The property is the site of a small shopping
center consisting of various restaurants, a
gym, and a large "Chuck E. Cheese's"
restaurant with a large surface parking lot.
See 6371‐001‐027. Adjacent uses include
single‐family residences, DD’s Discounts, a
commercial strip mall.
31 6371‐001‐027 (1) C‐G C ‐ Commercial R40‐OV 2.53 2.53 6003 ROSEMEAD BLVD 6003 DE LLC ET AL
PARK PLAZA
SHOPPING
CENTRE DE LL
35 0.35 0 30 6 9 15 29,126.1 80,871.1
The property is the site of a small shopping
center consisting of a restaurant and a "DD's
Discounts" store with large surface parking
lot. See 6371‐001‐026. Adjacent uses include
Attachment A
Appendix B: Candidate Sites Analysis Page B‐19
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes single‐family residences, the continued strip
mall, and surface parking.
32 6377‐003‐032 CPD C ‐ Commercial R40‐OV 4.99 4.99 9100 WHITTIER BLVD BRIDGES AMERICA FOUNDATION L P 35 0.35 0 61 12 18 31 62,220.6 155,081.4 The property is the site of a large Superior
Grocers, a grocery store with large surface
parking lot. Located within a larger shopping
center. Adjacent uses include fast food
restaurants, strip mall commercial uses, a
Dollar Tree store, and large surfacing parking
lot.
33 6377‐003‐033 CPD C ‐ Commercial R40‐OV 1.20 1.20 9050 WHITTIER BLVD CROSSROADS PLAZA LP 35 0.35 0 14 2 4 8 18,546.8 33,875.6 The property is the site of a small strip
consisting of restaurants and a mix of
businesses with large surface parking lot. See
6377‐003‐032.
34 6377‐003‐036 CPD C ‐ Commercial R40‐OV 0.80 0.80 5006 ROSEMEAD BLVD
MINTZ MARK M
MARK AND
LAUREN MINTZ
TRUST
35 0.35 0 9 1 2 6 9,605.2 25,349.9
The property is the site of a small strip mall
consisting of restaurants and a mix of
businesses with large surface parking lot. See
6377‐003‐032.
35 6378‐017‐001 (1) C‐G C ‐ Commercial R40‐OV 1.96 1.96 6508 ROSEMEAD BLVD UNION BUILDING CORP 35 0.35 0 24 4 7 13 14,524.3 70,795.0 The property is the site of a United Auto
Workers, a labor union building with a large
surface parking lot. Adjacent uses include
Knights Inn Pico Rivera and single‐family
residences.
36 6378‐017‐004 (1) C‐G C ‐ Commercial R40‐OV 4.43 4.43 6540 ROSEMEAD BLVD LIN AND SONS INVESTMENT INC 35 0.35 0 54 10 16 28 36,187.2 156,529.9 The property is the site of the Knights Inn, a
hotel with a large surface parking lot.
Adjacent uses include a Water District
building, single‐family residences, and a labor
union building.
37 6378‐019‐019 (1) C‐G C ‐ Commercial R40‐OV 0.62 0.62 6750 ROSEMEAD BLVD BRADLEY PAUL E JR & STEVE S 35 0.35 0 7 1 2 4 4,189.0 22,979.1 The corner property is the site of Jack in the
Box, a drive through restaurant with a large
surface parking lot. Adjacent uses include
restaurants and surface parking lots.
38 6378‐019‐037 (1) C‐G C ‐ Commercial R40‐OV 1.25 1.25 9055 WASHINGTON BLVD NAZIRI JACOB CO TR ET AL TERMECHI K 35 0.35 0 15 3 4 8 9,729.5 44,655.1 The corner property is the site of a small strip
mall consisting of a laundromat, dental office,
and liquor store with large surface parking lot
and vacant area in rear. Adjacent uses include
commercial offices and a large surface
parking lot, and multi‐family residences and
surface parking.
Attachment A
Appendix B: Candidate Sites Analysis Page B‐20
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes 39 6378‐019‐052 (1) C‐G C ‐ Commercial R40‐OV 0.54 0.54 9033 WASHINGTON BLVD MACKEL LAWRENCE O 35 0.35 0 6 1 1 4 6,658.8 16,681.2 The property is the site of a vacant 2‐story
office building with a large surface parking
lot. Previous tenants were health related.
Adjacent uses include a restaurant with a
large surface parking lot, a small strip mall,
and multi‐family residences.
40 6378‐019‐053 (1) C‐G C ‐ Commercial R40‐OV 0.55 0.55 9049 WASHINGTON BLVD TERMECHI KAMROUZ CO TR NAZIRI PEYMAN 35 0.35 0 6 1 1 4 6,502.9 17,426.4 The property is the site of a large building
with health‐related tenants and a large
surface parking lot. Adjacent uses include
another 2‐story office building with a large
surface parking lot, a small strip mall, and
multi‐family residences.
41 6378‐019‐058 (1) C‐G C ‐ Commercial R40‐OV 0.72 0.72 6730 ROSEMEAD BLVD PICO RIVERA LLC 35 0.35 0 8 1 2 5 4,769.2 26,572.5 The property is the site of a vacant building
with a large surface parking lot. Previous
tenant was a Sizzler's restaurant. Adjacent
uses include restaurants with surface parking
lots.
42 6378‐019‐071 (1) C‐G C ‐ Commercial R40‐OV 0.69 0.69 6722 ROSEMEAD BLVD KING TACO RESTAURANT INC 35 0.35 0 8 1 2 5 5,702.7 24,286.4 The property is the site of King Taco, a
restaurant with a large surface parking lot.
Adjacent uses include a strip mall, restaurant,
and multi‐family residences with surface
parking lots.
43 6378‐019‐072 (1) C‐G C ‐ Commercial R40‐OV 1.40 1.40 6620 ROSEMEAD BLVD MKC PROPERTIES INC 35 0.35 0 17 3 5 9 23,479.9 37,673.8 The property is the site of a small strip mall
consisting of restaurants and a mix of
businesses with large surface parking lot. Two
separate structures. Adjacent uses include
multi‐family residences with surface parking
and a restaurant with surface parking.
44 6378‐020‐026 C‐C C ‐ Commercial R40‐OV 0.75 0.75 9107 WASHINGTON BLVD SCI CALIFORNIA FUNERAL SERVICES 35 0.35 0 9 1 2 6 11,370.3 21,421.1 The property is the site of a funeral home
with large surface parking lot. Adjacent uses
include single‐family residences and a small
strip mall with surface parking across the
street along Bequette Ave.
45 6378‐029‐022 (2) C‐G C ‐ Commercial R40‐OV 0.52 0.52 9337 WASHINGTON BLVD WEST INVESTMENTS LLC 35 0.35 0 6 1 1 4 6,584.7 16,012.2 The corner property is the site of a retail
store with a surface parking lot. Adjacent uses
include the City of Pico Rivera Parks &
Recreation Department and a
communications utilities building.
46 6378‐029‐801 (2) C‐G C ‐ Commercial R40‐OV 0.58 0.58 9317 WASHINGTON BLVD GTE CALIF INC 35 0.35 0 7 1 2 4 11,559.5 13,754.4 The property is the site of Frontier Communications, a telecommunications provider with large surface parking lot. Adjacent uses include a convenience store, Attachment A
Appendix B: Candidate Sites Analysis Page B‐21
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes the City of Pico Rivera Parks & Recreation
Department, and single‐family residences
across the street.
47 6378‐029‐802 (2) C‐G C ‐ Commercial R40‐OV 0.12 0.12 GTE CALIF INC 35 0.35 0 1 0 0 1 2,868.3 2,289.8 The property is the site of a utility easement
for Frontier Communications, a
telecommunications provider. See 6378‐029‐
801.
48 6378‐029‐900 (2) C‐G C ‐ Commercial R40‐OV 0.62 0.62 6767 PASSONS BLVD PICO RIVERA CITY 35 0.35 0 7 1 2 4 7,430.8 19,538.2 The property is the site of The City of Pico
Rivera Parks and Recreation Department with
large surface parking lot. Adjacent uses
include a convenience store, communications
utilities building, surface parking, and single‐
family residences.
49 6379‐034‐024 (2) C‐G C ‐ Commercial R40‐OV 0.43 0.43 9437 WASHINGTON BLVD MORIARTY THADDEUS J JR CO TR STEWARD DALE 35 0.35 0 5 1 1 3 2,871.1 15,982.3 The property is the site of a drive through
liquor/convenience store with a large surface
parking lot. Adjacent uses include a strip mall
with commercial retail uses, single‐family
residences, and a Shell gas station and car
wash.
50 6379‐034‐025 (2) C‐G C ‐ Commercial R40‐OV 0.30 0.30 6750 PASSONS BLVD FIRST HOLDINGS LLC 35 0.35 0 3 0 0 3 6,171.6 7,028.7 The property is the site of a small strip
consisting of restaurants and a mix of
businesses with a surface parking lot in front.
Adjacent uses include a Shell gas station and
car wash, single‐family residences, and a
liquor/convenience store with surface
parking.
51 6379‐034‐026 (2) C‐G C ‐ Commercial R40‐OV 0.69 0.69 6758 PASSONS BLVD D AND L PROPERTIES INC 35 0.35 0 8 1 2 5 11,461.2 18,586.8 The property is the site of a small strip
consisting of restaurants and a mix of
businesses with a surface parking lot in front.
See 6379‐034‐025.
52 6379‐034‐027 (2) C‐G C ‐ Commercial R40‐OV 0.84 0.84 9411 WASHINGTON BLVD TESORO SOUTH COAST COMPANY LLC 35 0.35 0 10 2 3 5 5,249.7 31,386.7 The corner property is the site of Shell, a gas
station with a convenience store, a car wash,
and a large surface parking lot. Adjacent uses
include a strip mall with commercial retail
uses, a convenience/liquor store, and surface
parking.
53 6381‐014‐007 C‐C C ‐ Commercial R40‐OV 0.92 0.92 7226 ROSEMEAD BLVD BHAKTA GOKAL M & URMILA 35 0.35 0 11 2 3 6 13,978.3 26,045.9 The corner property is the site of America's Best Value Inn, a hotel with a large surface parking lot. Adjacent uses include Colonial Attachment A
Appendix B: Candidate Sites Analysis Page B‐22
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes Gardens Nursing Home and single‐family
residential.
54 6382‐018‐029 I‐L LI ‐ Light Industrial R40‐OV 1.96 1.96 9011 BERMUDEZ ST STORAGE EQUITIES PS PARTNERS 35 0.35 0 24 4 7 13 38,443.0 46,869.4 The corner property is the site of Public
Storage, a large storage facility with large
surface parking lot areas surrounding the five
storage buildings. Adjacent uses include an
office building and distribution warehouses.
Multi‐family residences are located directly
across the street on Rosemead Blvd.
55 6382‐021‐036 (2) C‐G C ‐ Commercial R40‐OV 0.62 0.62 9315 SLAUSON AVE OXNARD LAND LLC 35 0.35 0 7 1 2 4 2,360.5 24,841.0 See 6382‐021‐040.56 6382‐021‐038 (2) C‐G C ‐ Commercial R40‐OV 0.45 0.45 9335 SLAUSON AVE OXNARD LAND LLC 35 0.35 0 5 1 1 3 3,637.7 16,001.5 See 6382‐021‐040.57 6382‐021‐040 (2) C‐G C ‐ Commercial R40‐OV 1.28 1.28 9311 SLAUSON AVE OXNARD LAND LLC 35 0.35 0 15 3 4 8 24,479.2 29,435.9 The property is the site of a strip mall
consisting of restaurants and a mix of
businesses with large surface parking lot. 3
structures. Adjacent uses include fast food
restaurants and surface parking.
58 6382‐021‐041 (2) C‐G C ‐ Commercial R40‐OV 0.08 0.08 9335 SLAUSON AVE OXNARD LAND LLC 35 0.35 0 0 0 0 0 ‐ ‐ See 6382‐021‐040.59 6383‐001‐025 (2) C‐G C ‐ Commercial R40‐OV 1.08 1.08 9414 WASHINGTON BLVD SOLANKI PROPERTIES LLC 35 0.35 0 13 2 3 8 24,845.0 22,179.8 The property is the site of Big Saver Foods, a grocery store with large surface parking lot. Adjacent uses include single‐family residences.60 6383‐001‐026 (2) C‐G C ‐ Commercial R40‐OV 0.8 0.80 9414 WASHINGTON BLVD SOLANKI PROPERTIES LLC 35 0.35 0 9 1 2 6 2,205.0 32,673.6 See 6383‐001‐025.61 8121‐025‐017 C‐G C ‐ Commercial R40‐OV 0.87 0.87 4502 ROSEMEAD BLVD CHOW CECILIA L J M AND C L CHOW TRUST 35 0.35 0 10 2 3 5 12,742.4 25,169.7 The corner property is the site of a small strip mall with recent improvements, consisting of restaurants and a mix of businesses with a large surface parking lot in front. Adjacent Attachment A
Appendix B: Candidate Sites Analysis Page B‐23
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes uses included a large vacant site and a Norms
restaurant with a large surface parking lot.
62 8121‐026‐017 C‐G C ‐ Commercial R40‐OV 1.11 1.11 4518 ROSEMEAD BLVD
GONZALEZ
LUDIVINALUDIVINA
GONZALEZ TRUST
35 0.35 0 13 2 3 8 19,966.6 28,466.1
The property is the site of a small strip mall,
consisting of restaurants and a mix of
businesses with a large surface parking lot.
Adjacent uses include a Drive‐thru dairy
business, multi‐family residences, and a
utilities site.
63 8121‐026‐020 C‐G C ‐ Commercial R40‐OV 0.51 0.51 9001 BEVERLY RD KIM TAE K AND MYUNG H TRS KIM FAMILY TRUST 35 0.35 0 6 1 1 4 2,830.5 19,499.0 The corner property is the site of a drive
through liquor/convenience store with a large
surface parking lot. Adjacent uses include
multi‐family residences and a commercial
strip mall with surface parking.
64 8122‐005‐039 IPD LI ‐ Light Industrial R40‐OV 2.90 2.90 4334 SAN GABRIEL RIVER PKWY EXTRA SPACE PROPERTIES 103 LLC 35 0.35 0 35 7 10 18 57,064.6 69,121.2 The corner property is the site of Extra Space
Storage, a large storage facility with large
surface parking lot areas surrounding the
eight storage buildings. Adjacent uses include
the Albert Robles Center for water recycling
and environmental learning and the San
Gabriel River.
65 8122‐011‐027 IPD LI ‐ Light Industrial R40‐OV 2.74 2.74 9612 BEVERLY BLVD EXTRA SPACE OF PICO RIVERA LLC 35 0.35 0 33 6 9 18 58,778.9 60,110.9 The property is the site of Extra Space
Storage, a large storage facility with large
surface parking lot areas surrounding the
eight storage buildings. Adjacent structures
include the Pico Rivera Community Center
and industrial uses.
66 6368‐017‐002 (1) P‐A C ‐ Commercial R40‐OV 0.91 0.91 8345 TELEGRAPH RD RIO HONDO MEDICAL PLAZA LLC 25 1 0 22 4 6 12 ‐ 39,595.8 Rio Hondo Medical Plaza. The property
contains large surface parking lot areas,
including vehicle storage and several one and
two story dated medical office buildings. The
property is adjacent to existing multi‐family
residential uses along Telegraph Rd.
67 6368‐017‐003 (1) P‐A C ‐ Commercial R40‐OV 1.87 1.87 8359 TELEGRAPH RD RIO HONDO MEDICAL PLAZA LLC 25 1 0 46 9 13 24 ‐ ‐ See 6368‐017‐002.
Attachment A
Appendix B: Candidate Sites Analysis Page B‐24
Table B‐5: Sites to Accommodate RHNA
Note: 1. Sites used in previous housing element update cycles subject to by‐right per Housing Program 4D.
2. An analysis of small sites identified in the City’s inventory is shown in Table B‐3.
ID PARCEL NUMBER CITY ZONING CODE GP Overlay GROSS ACREAGE NET ACREAGE SITE ADDRESS Ownership Assumed Density Commercial Development Factor Existing Units Total Potential Units Low/Very Low Moderate Above Moderate Existing Building SF Remaining Lot SF Potential Notes 68 6368‐017‐005 (1) P‐A C ‐ Commercial R40‐OV 1.36 1.36 8432 BIRCHBARK AVE RIO HONDO MEDICAL PLAZA LLC 25 1 0 34 6 10 18 16,950.3 42,313.1 See 6368‐017‐002.69 6368‐017‐006 (1) P‐A C ‐ Commercial R40‐OV 1.14 1.14 8337 TELEGRAPH RD RIO HONDO MEDICAL PLAZA LLC 25 1 0 28 5 8 15 22,718.3 26,909.0 See 6368‐017‐002.
Attachment A
the transportation solutions company...
TAZ POP RES HH Tot_emp OD_CarP_VMT OD_CarA_VMT OD_TrkP_VMT OD_TrkA_VMT OD_TotP_VMT OD_TotA_VMT 21795000 4346 4197 1131 5890 200950 208466 44521 44560 245471 25302621801000 4374 4371 1341 1873 92057 93123 4690 5074 96747 9819721804000 6717 6634 1850 3509 181730 181876 12710 13095 194440 19497121806000 4920 4819 1327 370 64129 64709 2818 2589 66947 6729821820000 5964 5964 1434 885 88991 88425 995 988 89986 8941321821000 5670 5662 1485 2526 131079 134942 2517 2515 133597 13745721823000 2982 2982 874 225 45082 44105 770 770 45852 4487421826000 5970 5872 1683 1097 106214 106730 2031 2039 108245 10876921835000 5090 5090 1275 2016 97009 97127 11938 12045 108946 10917221848000 8986 8981 2352 1118 125949 126150 8352 9048 134302 135198 TAZ POP RES HH Tot_emp OD_CarP_VMT OD_CarA_VMT OD_TrkP_VMT OD_TrkA_VMT OD_TotP_VMT OD_TotA_VMT 21795000 5561 5412 1451 5890 209601 218860 45035 45102 254636 26396221801000 4657 4654 1436 1873 94429 95254 4840 5226 99269 10048021804000 7956 7873 2185 3509 191011 191087 12908 13277 203920 20436421806000 4969 4868 1341 370 64468 65270 2812 2588 67280 6785821820000 6405 6405 1543 885 92084 91678 1036 1031 93121 9270821821000 6576 6568 1746 2526 137502 140223 2627 2614 140129 14283721823000 4215 4215 1235 225 55350 54472 925 924 56275 5539621826000 6270 6172 1792 1097 108972 109250 2119 2127 111091 11137721835000 5424 5424 1356 2016 99765 100066 12068 12176 111833 11224121848000 9157 9152 2398 1118 127472 127945 8387 9087 135859 137032 Year 2020 Without Project
Year 2020 With Project
Attachment B - Model Outputs
Q:\Rincon - Pico Rivera Housing Element\MOdel Files\vmt_picorivera_he the transportation solutions company...
TAZ POP RES HH Tot_emp OD_CarP_VMT OD_CarA_VMT OD_TrkP_VMT OD_TrkA_VMT OD_TotP_VMT OD_TotA_VMT 21795000 4657 4495 1210 6480 200391 198962 65629 66826 266020 26578821801000 4464 4461 1365 1894 86127 86950 6264 6969 92391 9391921804000 7252 7162 1993 3888 183899 187065 18719 19751 202618 20681521806000 5542 5433 1494 405 70047 71850 3468 3133 73516 7498321820000 6656 6656 1624 1067 97153 98106 1384 1390 98538 9949621821000 6086 6078 1600 2678 131214 137657 3432 3482 134645 14113921823000 3044 3044 891 239 42171 42182 891 899 43062 4308121826000 6776 6671 1900 1297 112115 114518 2507 2536 114622 11705421835000 5693 5693 1440 2192 98744 100190 15343 15476 114086 11566521848000 9149 9144 2398 1161 117291 121771 13578 14891 130869 136662 TAZ POP RES HH Tot_emp OD_CarP_VMT OD_CarA_VMT OD_TrkP_VMT OD_TrkA_VMT OD_TotP_VMT OD_TotA_VMT 21795000 5872 5710 1530 6480 209580 207865 65751 66927 275331 27479221801000 4747 4744 1460 1894 87919 88810 6308 7008 94227 9581821804000 8491 8401 2328 3888 192529 195431 18881 19939 211411 21537021806000 5591 5482 1508 405 70378 72147 3470 3136 73848 7528321820000 7097 7097 1733 1067 100685 101459 1431 1436 102115 10289521821000 6992 6984 1861 2678 137907 144042 3555 3603 141461 14764521823000 4277 4277 1252 239 52403 52068 1059 1069 53462 5313721826000 7076 6971 2009 1297 114578 116992 2552 2583 117131 11957621835000 6027 6027 1521 2192 101491 102638 15386 15500 116877 11813821848000 9320 9315 2444 1161 118928 123417 13594 14905 132522 138323 Year 2040 Without Project
Year 2040 With Project
Attachment B - Model Outputs
Q:\Rincon - Pico Rivera Housing Element\MOdel Files\vmt_picorivera_he ORDINANCE NO. 1174
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PICO RIVERA, CALIFORNIA, AMENDING TITLE 18, ZONING, OF THE PICO RIVERA MUNICIPAL CODE ADDING CHAPTER 18.09 ESTABLISHING THE R-40
OVERLAY ZONE AS HEREIN REFERRED TO AS ZONE CODE
AMENDMENT NO. 190
WHEREAS, pursuant to its police power, the City may enact and enforce laws within its boundaries which promote the public health, morals, safety, or general welfare of the community, and are not in conflict with general laws; and WHEREAS, comprehensive zoning regulations lie within the police power of the City pursuant to the Pico Rivera Municipal Code Section 18.02.040; and WHEREAS, the Sixth Cycle 2021-2029 Housing Element requires zoning ordinance amendments and text changes in conformity with state law, which includes the amendments contained herein; and
WHEREAS, a new Mixed Use land use designation R-40 Overlay Zone was created and therefore requires the creation of development standards; and WHEREAS, the Planning Commission of the City of Pico Rivera conducted a public hearing on the matter of amendments of the Municipal Code including sections of Title 18, Zoning at a legally noticed public hearing held on June 5, 2023; and WHEREAS, the City Council of the City of Pico Rivera desires to amend the Pico Rivera Municipal Code as set forth herein.
NOW THEREFORE, BE IT ORDAINED by the City Council of the City of Pico Rivera as follows:
SECTION 1. The City Council finds that the above recitals are true and correct and incorporated herein as part of the findings.
SECTION 2. A Mitigated Negative Declaration (MND) Addendum was prepared in accordance with Section 15164 of the California Environmental Quality Act (“CEQA”) Guidelines, which based on substantial evidence set forth in the record, including but not limited to the Addendum, staff report, and public comment, the City Council finds, that an addendum to the MND is the appropriate document for disclosing the minor changes and additions that are necessary to assess the potential environmental impacts of the Project.
The City Council hereby finds and determines that none of the conditions under Section 15162(a)(1)-(3) of the CEQA Guidelines requiring subsequent environmental review have occurred.
Enclosure 2
5b
ORDINANCE NO. 1174
PAGE 2 of 34
SECTION 3. The City Council finds that the proposed amendments are consistent with the spirit and integrity of the General Plan and the adopted 2021-2029 Housing Element, as the purpose of the code is to protect the public health, safety and general welfare of the public.
SECTION 4. Chapter 18.09, R-40 Overlay Zone, of Title 18 of the Zoning Ordinance of the Pico Rivera Municipal Code is hereby amended to add Chapter 18.09 to read as follows:
CHAPTER 18.09 R-40 OVERLAY ZONE
18.09.010 Establishment.
18.09.020 Intent and purpose.
18.09.030 Applicability-Criteria.
18.09.040 Permitted uses.
18.09.050 Property development conditions.
18.09.060 Off-street parking.
18.09.070 Signs and advertising
18.09.010 Establishment.
There is hereby established an overlay zone which shall hereinafter be known as and referred to as the “R-40 Overlay Zone” and which shall function and serve as set out in this chapter.
18.09.020 Intent and purpose.
A. The R-40 Overlay Zone is intended to allow an integrated mix of residential and commercial uses, including stand-alone residential or commercial development.
B. The purpose of the overlay zone is to support the development of higher density housing while promoting the development of residential uses in non-residential areas to create a balance within the City. The purpose is to also encourage development that is pedestrianoriented, storefront-style shopping, creates additional employment opportunities and accommodates more units for a diversity of multi-family housing types and housing needs such as special needs and large families.
C. The R-40 Overlay Zone has the following major objectives:
1. Implement the City’s 6th cycle 2021-2029 Housing Element by facilitating residential development on identified parcels and enabling the development of affordable housing consistent with the requirements of State Government Code Article 10.6 (65580).
2. Facilitate well-designed standalone residential and mixed-use development that promote pedestrian-oriented design that creates a more vibrant and active street environment.
3. Contribute to the City’s mix of housing types.
4. Promote a compatible mix of residential, commercial and service uses with strong functional relationships.
ORDINANCE NO. 1174
PAGE 3 of 34
5. Strengthen the City’s economic base and provide employment opportunities close to home for residents of the City.
18.09.030 Applicability-Criteria.
A. Relationship between Base Zone Standards and Overlay Zone Standards. For properties within the R-40 Overlay Zone, the regulations allow standalone residential and mixed-use development as an alternative to the stand-alone base zone development allowed under the base (underlying) zone standards.
B. Base Zone Standards.
1. New projects may be developed in compliance with the existing underlying base zone, provided that all standards and requirements of the underlying base zone are met.
2. Regulations, development standards, and requirements in the underlying base zone shall continue to apply to those projects that are currently developed according to the existing standards.
C. For legal nonconforming uses (i.e., uses that do not comply with the provisions of the base zone), the provisions in Chapter 18.54 (Nonconforming Uses) shall apply.
D. Option to Apply R-40 Overlay Zone Development Standards. The owner or developer of any property within the R-40 Overlay Zone may choose to exercise the R-40 Overlay development standards or continue to utilize the standards of the underlying zone. An applicant may choose to develop standalone multi-family developments or mixed-use within the R-40 Overlay Zone.
18.09.040 Permitted uses.
Regulations governing permitted uses of land in the R-40 Overlay Zone are specifically set forth in Chapter 18.40, Land Use Regulations, of this title.
18.09.050 Property development conditions.
Regulations governing the development of property for uses in the R-40 Overlay Zone are specifically set forth in Chapter 18.42, Property Development Regulations of this title.
18.09.060 Off-street parking.
Regulations governing off-street parking requirements for uses and development of property in the R-40 Overlay Zone are calculated per the land use proposed to be developed as specifically set forth in Chapter 18.44, Off-Street Parking and Loading of this title, except as provided below:
Minimum off-street parking requirements, inclusive of accessible parking and guest parking, shall comply with California Density Bonus Law (California Government Code section 65915).
18.09.070 Signs and advertising
Regulations governing permitted signs and advertising for uses and development of property in the R-40 Overlay Zone are permitted per the land use zone specifically set forth in Chapter 18.46, Signs and Advertising of this title.
ORDINANCE NO. 1174
PAGE 4 of 34
SECTION 5. Table 18.40.40, Land Use Chart, of Title 18 of the Zoning Ordinance of the Pico Rivera Municipal Code is hereby amended to read the following:
Table 18.40.040 LAND USE CHART
(For explanation of notes see Section 18.40.050C; for prohibited uses see Section
18.40.050B)
Land Use Zone
A. Public Uses* O-S Public Facilities M-U Overlay R-40 Overlay
1. Civic or social associations 2, 63
2. Educational institutions, public 2 2, 63
3. Flood control facilities X 2, 63
4. Government agencies; local, county, state or federal 2, 63
5. Libraries, public 2, 63
6. Off-street parking facilities 1, 32 2 2
7. Parks and playgrounds 2 2 2
8. Permanent and interim open spaces 2 2 2
9. Public utility facilities and structures 2 2, 63
10. Recreational facilities 2
11. Riding, hiking and bicycle trails 1 2, 63
12. Nurseries, wholesale 2 2, 63
13. Temporary uses 42 42
14. Wireless telecommunication facilities 65 65
* Refer to Zoning Administrator determinations, on file in community development department planning division.
Land Use Zone
B. Residential Uses* R-E S-F R-I PUD R-M P E-S
M-U
Overlay
R-40 Overlay
1. Accessory buildings and uses X X X X X X, 76 X
2. Animals, poultry and fowl, keeping 3 3 3 3 3
3. (Unassigned)
4. Boardinghouses 2, 4
5. Farms, limited to agriculture crops only 2 2
ORDINANCE NO. 1174
PAGE 5 of 34
6. Guest houses, limited to one only X X
7. Multiple-family dwellings 1, 76, 35 1, 35, 76 1, 35, 76 Land Use Zone
B. Residential Uses* R-E S-F R-I PUD R-M P E-S
M-U
Overlay
R-40 Overlay
8. Planned residential unit developments 1, 76 1, 76
9. Single-family dwellings 6 6 76 76 X
10. Two-family dwellings 5
11. Senior citizen housing 1, 76 76 76
12. Community care facility (<6 persons) X X X X X
13. Community care facility (7+ persons) 1 1 1 1 1
14. Emergency shelters, up to 20 occupants
within the city
73 Land Use Zone
B. Residential Uses* R-E S-F R-I PUD R-M P E-S
M-U
Overlay
R-40
Overlay
15. Emergency shelters, more than
20 occupants within the city
1, 73
16. SRO (efficiency units) 74 74 74, 76 74,76
17. Supportive housing X X X X X X X
18. Transitional housing X X X X X X X
19. Second dwelling units 75 75 75
* Refer to Zoning Administrator determinations, on file in community development department planning division.
Land Use Zone
C. Special Uses* R-E S-F R-I PUD R-M P
M-U
Overlay
R-40 Overlay
1. Cottage food operations 11 11 11 11 11
ORDINANCE NO. 1174
PAGE 6 of 34
2. Day care centers 2, 7, 8 2, 7, 8 2, 7, 8 2, 7, 8 2 2 2
3. Educational institutions, private 2, 7 2, 7 2, 7, 9
4. Electric distribution substations 1 1 1 1 1 1
5. Foster care homes 10 10
6. Gas metering and control stations 1 1 1 1 1 1
7. Home occupations 11 11 11 11 11 11 11
8. Hospitals 2 1 1
Land
Use
Zone
C. Special Uses* R-E S-F R-I PUD R-M P
M-U
Overlay
R-40 Overlay
9. Mobilehome parks 1
10. Off-street parking facilities 1 1
11. Private recreation and open spaces 2 2 2 2 1 1
12. Ranches, limited to livestock only 1, 3
13. Religious places of worship 1 1 1 1 1 1 1
14. Rest homes 1
15. Water facilities 1 1 1 1 1 1
16. Satellite dish receiving antenna X, 52 X, 52 X, 52 X, 52 X, 52
17. Amateur radio/CB radio antennas 2, 38 2, 38 2, 38 2, 38 2, 38
18. Family day care homes 8, 40 8, 40 8, 40 2, 8,
40 2, 40 2, 40 2,40
19. Garage sales 41 41 41 41 41
20. Temporary uses 42 42 42 42 42 42 42 42
21. Wireless telecommunication facilities 65 65 65 65 65 65 65 65
22. Modular classroom/offices 2, 70 2, 70 2, 70 2
* Refer to Zoning Administrator determinations, on file in community development department planning division.
Land Use Zone
ORDINANCE NO. 1174
PAGE 7 of 34
Land Use Zone
D. Commercial Uses* (Every permitted
use of land shall be conducted within
an entirely enclosed building except
as otherwise designated below.)
P-A C-M C-N C-C C-G CPD
M-U
Overlay
R-40
Overlay
7. Automobile leasing and renting 20, 24,
51, 55
20, 24,
51, 55
20, 24,
51, 55
1, 20,
24, 51,
55 8. Automobile parts and
accessories stores
20, 29,
55, 57
20, 29,
55, 57
20, 29,
55, 57
1, 29,
55, 57
9. Automobile repair shops 1, 28,
36 1, 28,
36 1, 28,
36 1, 28
10. Automobile sales, new and used 2, 13,
28 2, 13,
28 2, 13,
28 11. Automobile service stations 1, 28,
81 1, 19,
28 1, 19,
28, 39,
62, 81
1, 19,
28, 39,
62, 81
12. Automobile upholstery shops 2, 57 1 1
13. Automotive related sales and
installation
2 2 2
D. Commercial Uses* (Every permitted
use of land shall be conducted within
an entirely enclosed building except
as otherwise designated below.)
P-A C-M C-N C-C C-G CPD
M-U
Overlay
R-40
Overlay
1. Adult uses 60
2. Animal hospitals 20, 23,
55, 57
20, 23,
55, 57
20, 23,
55, 57
20, 23,
55, 57
20, 23, 55,
57 3. Antique shops 12, 20,
27, 55,
57 12, 20,
27, 55,
57 1, 12,
27, 55,
57 1, 12,
27, 57
1, 12, 27,
57 4. Appliance sales, rentals, repairs, service 20, 28, 55 5. Automated teller machinesinterior55 55 55 55 55 1, 55 55 55
6. Automated teller machinesexterior61 61 61 61 61 61 61 61 ORDINANCE NO. 1174
PAGE 8 of 34
14. Bakeries 15, 20,
55, 57
15, 20,
55, 57
15, 20,
55, 57
15, 20,
55, 57
1, 15,
55, 57
15, 55,
57 15, 55, 57
15. Banks, savings and loan associations,
and other similar lending institutions, but
excluding pawnshops
20, 55,
57, 61
20, 55,
57, 61
20, 55,
57, 61
1, 55,
57, 61
55, 57,
61 55, 57, 61
16. Barbershops and beauty shops 20, 55,
33, 57
20, 55,
57 20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
17. Bars and cocktail lounges 1, 25 1, 25 1, 25
18. Bicycle shops 20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
19. Bookstores 20, 55,
33, 57
20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
20. Bowling alleys, skating rinks and similar
recreational facilities
1 2 1 1 1
21. Brewery 1, 80 1, 80 1, 80 1, 80 1, 80 1, 80 1, 80
22. Building materials, new 20, 55
23. Business offices and services 20, 55,
57, 81
20, 55,
57, 81
20, 55,
57, 81
20, 55,
57, 81
1, 55,
57, 81
20, 55,
57, 81
20, 55, 57,
81 24. Cafés and restaurants 20, 33,
55, 56,
66, 67
20, 55,
56, 66,
67 20, 55,
56, 66,
67 20, 55,
56, 66,
67 1, 55,
56, 66,
67 1, 20,
55, 56,
66, 67
1, 20, 55,
56, 66, 67
Land Use Zone
D. Commercial Uses* (Every permitted
use of land shall be conducted within
an entirely enclosed building except
as otherwise designated below.)
P-A C-M C-N C-C C-G CPD
M-U
Overlay
R-40
Overlay
25. Carwashes, automatic or coinoperated only2 1 1
26. Ceramics, stone, tile products 20, 55
27. Check cashing establishments 55, 57,
72 55, 57,
72 28. Clothing and wearing apparel stores of
new retail merchandise only
20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
ORDINANCE NO. 1174
PAGE 9 of 34
29. Coin-operated games and game
arcades
1, 53,
55, 57
1, 53,
55, 57
1, 53,
55, 57
1, 53,
55, 57
30. Confectionery stores 20, 55,
57 20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
31. Craft and hobby shops 20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
32. Dental laboratories or scientific
research centers
1 1 1
33. Drapery shops 17, 20,
55, 57
17, 20,
55, 57
17, 20,
55, 57
1, 17,
55, 57
17, 55,
57 17, 55,
57 34. Dressmaking and millinery shops 17, 20,
55, 57
17, 20,
55, 57
1, 17,
55, 57
17, 55,
57 17, 55,
57 35. Drive-in and drive-thru business
establishments
1, 18,
28 1, 18,
28 1, 18,
28 1, 18,
28 1, 18,
28 1, 18,
28 36. Drug or alcohol outpatient
treatment facilities
1 1 1
37. Drugstore 20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
38. Dry cleaning, laundry and
pressing establishments
20, 33 20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
39. Electric distribution substation 1, 55 1 1 1
40. Electronic components and
supplies
20, 58
41. Equipment (light) rentals 20, 55
42. Florist shops 20, 33,
55, 57
20, 55,
57 20, 55,
57 20, 55,
57 1, 55,
57 20, 55,
57 20, 55,
57 43. Food markets 20, 55,
57 20, 55,
57 20, 55,
57 1, 55,
57 1, 55,
57 1, 55,
57 44. Fortune telling 1, 37
ORDINANCE NO. 1174
PAGE 10 of 34
Land Use Zone
D. Commercial Uses* (Every permitted
use of land shall be conducted within
an entirely enclosed building except
as otherwise designated below.)
P-A C-M C-N C-C C-G CPD
M-U
Overlay
R-40
Overlay
45. Fire cell generator 1, 55 1, 55 1, 55 1, 55
46. Furniture and appliance stores 20, 22,
55, 57
20, 22,
55, 57
20, 22,
55, 57
1, 22,
55, 57
20, 22,
55, 57
20, 22,
55, 57
47. Furniture, cabinet making 20, 58
48. Furniture upholstery 20, 55,
57 20, 55,
57 20, 55,
57 49. Galleries, works of art and
collections
20, 33,
55, 57
20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
50. Gas metering and control
stations
1, 55 1 2 2
51. Hardware stores 20, 55,
57 20, 55,
57 1, 55,
57 1, 55,
57 1, 55,
57 52. Home occupations 11 11 11 11 11
53. Hospitals/medical facilities 1 1 1 1 1
54. Hotels and motels 1 1
55. Jewelry stores 20, 33,
55, 57
20, 55,
57 20, 55,
57 1, 55,
57 1, 20,
55, 57
1, 20,
55, 57
56. Laundromats 2, 20,
55, 57,
81 2, 20,
55, 57,
81 2, 20,
55, 57,
81 1, 55,
57, 81
1, 55,
57, 81
1, 55,
57, 81
57. Liquor stores, packaged off-sale only 1, 81 1, 81 1, 81 1, 81 1, 81 1, 81
58. Live/work 78 78 78 78 77, 78 77, 78
59. Locksmith shop 20, 55,
57 20, 55,
57 20, 55,
57 20, 55,
57 55, 57 55, 57
60. Medical clinic 2 2 2 2 2 2 2 2
61. Medical laboratories 2 2 2 2 2
62. Mobilehome sales, new and used 2, 14
63. Motorcycle sales, repairs,
rentals, new and used
1 1 1
ORDINANCE NO. 1174
PAGE 11 of 34
64. Muffler shops, automobile only 1 1
65. Multifamily dwellings 1, 34,
57 1, 34 1, 34 1, 34 1, 76 1, 76
66. Newspaper publishing 1 1 1
Land Use Zone
D. Commercial Uses* (Every permitted
use of land shall be conducted within
an entirely enclosed building except
as otherwise designated below.)
P-A C-M C-N C-C C-G CPD
M-U
Overlay
R-40
Overlay
67. Nightclubs 1 1
68. Nurseries and retail building 20, 55 20, 55 1, 55
69. Off-sale of alcoholic beverages 1, 39 1, 39
70. Off-site hazardous waste facility 1, 43,
45 Land Use Zone
D. Commercial Uses* (Every permitted
use of land shall be conducted within
an entirely enclosed building except
as otherwise designated below.)
P-A C-M C-N C-C C-G CPD
M-U
Overlay
R-40
Overlay
71. Off-street parking facilities privately
owned and operated
2 2 2 1 1 1
72. On-site hazardous waste facility 44, 45,
55 73. On-site sale or tasting of
alcoholic beverages
1, 25 1, 25 1, 25 1, 25 1, 25 1, 25 1, 25
74. Packaging and assembly of nonhazardous products20, 28, 58 75. Parcel delivery 1
76. Pet shops and grooming 20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
77. Pharmacies 20, 33,
55, 57
20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
ORDINANCE NO. 1174
PAGE 12 of 34
78. Physical fitness clubs, physical
training including gyms
2 2 2 2 2
79. Physical therapy 2 2 2 2 2
80. Picture frames and framing 20, 55,
57 20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
81. Printing and reproduction
establishments
20, 28,
55, 57
20, 54,
55, 57
20, 54,
55, 57
1, 54,
55, 57
55, 57 55, 57
Land Use Zone
D. Commercial Uses* (Every permitted
use of land shall be conducted within
an entirely enclosed building except
as otherwise designated below.)
P-A C-M C-N C-C C-G CPD
M-U
Overlay
R-40
Overlay
82. Private clubs, fraternities, sororities,
lodges and institutions of nonprofit or
charitable nature
2 2 55, 57 55, 57
83. Religious places of worship 1 1 1
84. Resthomes 2 2 2
85. Retail sales and personal service
businesses
20, 55,
57, 81
20, 55,
57, 81
1, 55,
57, 81
55, 57,
81 55, 57,
81 86. Satellite dish receiving antenna 30 30 30 30 30 30 1 1
87. Self-storage facility 1, 71,
82 88. Shoe repair shops 20, 55,
57 20, 55,
57 55, 57 55, 57
89. Sign shops 28, 55 20, 55,
57 20, 55,
57 55, 57 55, 57
90. Small boat sales and service 20, 28,
55 91. Stationery stores, including
incidental printing
20, 55,
57 20, 55,
57 1, 55,
57 55, 57 55, 57
92. Studios (dance, martial arts, music, and
photography, except motion picture)
2, 20,
55, 57
2, 20,
55, 57
1, 55,
57 1, 55,
57 1, 55,
57 93. Temporary uses 42 42 42 42 42 42 42 42
94. Theaters 1 1 1 1 1
ORDINANCE NO. 1174
PAGE 13 of 34
95. Trade schools 1 1 1 1 1 1 1
96. Truck, trailer, camper, recreational
vehicle sales, new and used
1 97. Unclassified uses 1, 48 1, 48 1, 48 1, 48 1, 48 1, 48 1, 48 1, 48
98. Wireless telecommunication
facilities
45 45 45 45 45 45 1 1
99. Wrought-iron work shops 20, 28,
55 100. Yardage stores 20, 55,
57 20, 55,
57 1, 55,
57 SECTION 6. Note 76 of Section 18.40.050, Special Use Conditions and Chart Notes, of Title 18 of the Zoning Ordinance of the Pico Rivera Municipal Code is hereby amending the following:
Note 76. A project shall be approved with a streamlined administrative site plan/zoning consistency review only for properties identified in the 2014-2021 2021-2029 Housing Element to meet the Regional Housing Needs Assessment. To utilize the streamlined approach, the developer must restrict a minimum of 20% of the units as affordable to lower income households as defined under Section 50079.5 of the Health and Safety Code.
Landowners and developers that propose uses, structures, designs and site improvements shall comply with the following:
a. Application. The applicant shall submit a site plan application/zoning consistency review to the Zoning Administrator with the number of prints of the plans specified, together with a filing fee. The contents of the site plan review shall be specified by the Zoning Administrator. The Zoning Administrator shall require if deemed necessary, a parking, traffic, noise or any other study.
b. Completeness. If the Zoning Administrator determines the application to be incomplete, the applicant will be notified within thirty days, indicating what additional information is required to complete the application. The application will not be processed until that information is received by the Zoning Administrator. If no determination is made by the Zoning Administrator within thirty days, the application shall be deemed complete. c. Findings. The Zoning Administrator shall make the following findings in approving an application for review:
(i) That the site plan is consistent with the goals and policies of the general plan; (ii) That the proposed development is in accordance with all applicable and objective provisions of the Pico Rivera Municipal Code;
ORDINANCE NO. 1174
PAGE 14 of 34
(iii) That the proposed development shall not have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact without rendering the development unaffordable to low- and moderate-income households. As used in this paragraph, a “specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. Inconsistency with the zoning ordinance or general plan land use designation shall not constitute a specific, adverse impact upon the public health or safety.
d. Building Permit. A building permit shall be issued pursuant to administrative site plan/zoning approval. If there is a substantial change from the original site plan as determined by the Zoning Administrator, a revised application shall be resubmitted. e. Appeal. Denial of the application by the Zoning Administrator may be appealed pursuant to Chapter 18.64 of Title 18 of the Pico Rivera Municipal Code.
SECTION 7. Table 18.42.040, Property Development Chart-Contents, of Title 18 of the Zoning Ordinance of the Pico Rivera Municipal Code is hereby amended to read as follows:
[This space intentionally left blank]
ORDINANCE NO. 1174
PAGE 15 of 34
PROPERTY DEVELOPMENT REGULATIONS
CHART
(Part 1—R-E, S-F, R-I, PUD, R-M, and M-U and R40 Overlay Zones) Regulations
Zone
R-E S-F R-I PUD1R-M M-U
Overlay
R-40
Overlay A B
A. Lot Frontage and
Access
(1) (1) (2) (2) (2) (1, 3) (1,3) (1,3)
B. Size, Area &
Frequency of Zone
0.5<2.5 Acres
(Gross)
N/A 2.5 Acres
(Gross)
C. Lot Area 15,000sq. ft.
(8)
6,500 sq.
ft. (8)
4,200 sq. ft. (6) 1,500 sq.
ft. (6)
2,600 sq.
ft. (6)
12,500
sq. ft. (8,
9, 44)
D. Dwelling Unit One per One per One per lot 1—30 1—30 30 DUs 30 DUs Density lot (10) lot (11) DUs2 per
acre (12,
DUs2 per
acre
per
acre
(14)
per acre
(14)
40 DUs per
acre
13)
E. Floor Area per
Dwelling Unit. 1—6
deleted.
500 sq. ft.
(15)
500 sq. ft.
(15)
500 sq. ft (15)
7. Senior citizens
housing
F. Lot Size
1. Lot width
a. Corner or
reverse
corner lot
100 feet
(8)
70 feet
(8)
40 feet N/A 40 feet (19) (19) (19)
b. Interior lot 100 feet
(8)
60 feet
(8)
40 feet (42) 25 feet 40 feet
(42)
(19) (19) (19)
2. Lot depth 150 feet
(8)
100 feet
(8, 18)
N/A 65 feet
(42)
(19) (19) (19)
G. Yards
ORDINANCE NO. 1174
PAGE 16 of 34
Regulations
Zone
R-E S-F R-I PUD1R-M M-U
Overlay
R-40
A B Overlay
1. Front 30 feet
(20)
20 feet
(20)
20 feet to
garage, 15 feet to
residence (any
portion) Minimum
50% of front
setback 20 feet
N/A 18 feet to
garage, 15 feet
to residence
(any portion)
25 feet
(20, 31)
15 feet
(60)
15 feet (60)
2. Side
a. Interior 10 feet
(20)
5 feet
(20)
4 feet (56) N/A 4 feet (56) 5 feet (20,
23)
10 feet
(20, 61)
10 feet
(20, 61)
b. Street 20 feet
(20)
10 feet
(20)
8 feet (56) N/A 8 feet (56) 10 feet
(20, 23)
10 feet
(20)
10 feet
(20)
3. Rear
a. Case I 10 feet
(20, 25)
5 feet
(20, 25a)
50% minimum
20 feet and 50%
minimum 15
feet
N/A 50%
minimum 20
feet
and 50%
minimum 15
feet
10 feet
(20, 25a)
(26) (26)
b. Case II 15 feet
(20, 25b)
10 feet
(20, 25b)
N/A 15 feet
(20, 25b)
(26) (26)
c. Case III 20 feet
(20, 25c)
15 feet
(8,
20,
25 c)
20 feet
(20, 25c)
(26) (26)
4. Projections (8, 27) (8, 27) (27g) N/A (27f) (27) (62) (62) H. Building Heights 24 feet
(28)
24 feet
(28)
26 feet (28, 29) 26 feet
(28, 29)
26 feet
(28, 29)
28 feet
(28, 29)
60 feet
(58)
60 feet
(58)
I. Lot Coverage 35% lot
area (30)
40% lot
area
(30)
50% 80% lot
area (30)
50% 50% lot
area (30)
J. Location and
Relationship of
Buildings, Structures
and Uses
(31) (31) (31a, b, c, d, e, f) (31f, g, h,
i)
(31f, g, i, j) (31) (31a, b) (31a, b)
K. Fences, Hedges and
Walls
(32a, b, c,
d)
(32a, b,
c,
d)
(32c) (32a, b,
c, d,
e)
(32a, c,
h)
(32 a, c,
h)
L. Objective Design
Standards
64 64 64
M. Other Conditions,
Requirements
(33—39,
47, 49,
50, 53,
54, 55,
57, 65)
(33—39,
47, 49,
50, 53,
54, 55,
57, 65)
(33, 40, 49, 50,
53, 54, 55, 57,
65)
(33—39,
49, 50, 53,
55, 57, 65)
(33—39,
40, 49,
50, 53,
55, 57,
65)
(33—39,
41, 42,
47, 48,
50, 53,
55, 57,
65)
(34, 35, 36
37—39,
41, 44,
45, 47,
50, 53,
55, 57,
63, 65)
(34, 35, 36
37—39,
41, 44,
45, 47,
50, 53,
55, 57, 65,
66,)
ORDINANCE NO. 1174
PAGE 17 of 34
PROPERTY DEVELOPMENT REGULATIONS
CHART (continued) (Part 2—P-A, C-N, C-C, C-G,
C-M, I-L and I-G Zones)
Regulations Zone
P-A C-N C-C C-G C-M I-L I-G
A. Lot Frontage and
Access
(1, 3) (1, 3, 4) (1, 3) (1, 3) (1, 3) (1, 3) (1, 3)
B. Size, Area and
Frequency of Zone
1—1/2
acres
(5, 7)
4—20
acres
(7)
10 acres
(7)
3 acres
(7)
5 acres
(7)
10 acres
(7)
C. Lot Area 10,000
sq. ft.
12,000
sq. ft.
D. Dwelling Unit
Density
E. Floor Area Per
Dwelling Unit
1. Senior Citizens
Housing
F. Lot Size
1. Lot width
a. Corner or
reverse lot
b. Interior lot
2. Lot depth 120 feet 150 feet
G. Yards
1. Front 15 feet
(20, 22)
15 feet
(20, 22)
15 feet
(20, 22)
15 feet
(20, 22)
20 feet
(20, 22)
25 feet
(20, 21,
22)
25 feet
(20, 21,
22)
2. Side
a. Interior (24) (20, 23,
24)
(8, 20,
23, 24)
(23, 24) (23, 24) (23, 24) (23, 24)
ORDINANCE NO. 1174
PAGE 18 of 34
b. Street (23, 24) (23, 24) (8, 20,
23, 24)
(23, 24) (23, 24) (23, 24) (23, 24)
3. Rear (23, 26) (23, 26) (23, 26) (23, 26) (23, 26) (23, 26) (23, 26) a. Case I
Regulations Zone
P-A C-N C-C C-G C-M I-L I-G
b. Case II
c. Case III
4. Projections (27) (27) (27) (27) (27) (27) (27)
H. Building Height 42 feet
(28)
24 feet
(28)
38 feet
(28)
42 feet
(28, 48)
38 feet
(28, 48)
38 feet
(28, 48)
38 feet
(28, 48)
I. Lot Coverage 60% lot
area (30)
45% lot
area (30)
60% lot
area (30)
60% lot
area (30)
60% lot
area (30)
60% lot
area (30)
60% lot
area (30)
J. Location and
Relationship of Buildings,
Structures and Uses
(31-e, f,
g)
(31-e, f,
g)
(31-e, f,
g)
(31-e, f,
g)
(31-e, f,
g)
(31-e, f,
g)
(31-e, f,
g)
K. Fences, Hedges and
Walls
(32-a, c,
d, f, i)
(32-a, c,
d, f, i)
(32-a, c,
d, f, i)
(32-a, c,
d, f, i)
(32-a, c,
d, f, i)
(32-a, c,
d, f, i)
(32-a, c,
d, f, i)
L. Objective Design
Standards
64 64 64 64 64
M. Other Conditions,
Requirements and Use
Limitations
(33—39,
43, 44,
45, 50,
51, 53,
55, 57,
65, 66,)
(33—39,
44, 45,
50, 51,
53, 55,
57, 65)
(34—
39, 44,
45, 50,
51, 52,
53, 55,
57, 65,
66)
(34—39,
44, 45,
50, 51,
52, 53,
55, 57,
65, 66)
(34—39,
44, 45,
50, 51,
52, 53,
55, 57)
(34—39,
44, 45,
50, 52,
53, 55,
57, 65, 66)
(34—39,
44, 45,
50, 52,
53, 55,
57, 65, 66)
SECTION 8. Note 63 of Section 18.42.050, Special Use Conditions and Chart Notes, shall be amended to read the following:
Note 63. A conditional use permit shall be required for all mixed-use developments whether standalone residential or commercial. Multi-family developments located on the housing ORDINANCE NO. 1174
PAGE 19 of 34
opportunity sites (Housing Element sites identified in the General Plan) shall be approved by-right provided the development standards for the zone and the streamlined administrative review under Section 18.40.050 Note (76) are met. A minimum of twenty dwelling units per acre and maximum of thirty dwelling units per acre for the housing opportunity sites shall be required.
SECTION 9. Note 66 of Section 18.42.050, Special Use Conditions and Chart notes, of Title 18 of the Pico Rivera Zoning Ordinance is hereby created as follows:
Note 66. The underlying zone shall dictate whether an entitlement is required for standalone development. Multi-family developments located on the Housing Element sites (2021-2029 Housing Element sites identified in the General Plan) shall be approved by-right provided the development standards for the zone and the streamlined administrative review under Section 18.40.050 Note (76) are met. A minimum of twenty dwelling units per acre and maximum of forty dwelling units per acre for the housing opportunity sites shall be required.
In order to utilize the streamlined approach, the developer must restrict at least 20% of the units as affordable to lower income households as defined under Section 50079.5 of the Health and Safety Code.
Calculations for the required affordable housing resulting in a fraction of 0.5 or more shall be rounded up to the next whole number. A streamlined housing project proposed under SB 35 shall comply with all requirements of Government Code 65913.4.
SECTION 10. Note 64 of Section 18.42.050, Special Use Conditions and Chart Notes, of Title 18 of the Pico Rivera Zoning Ordinance is hereby amended to read as follows:
Note 64. Design Guidelines.
a. Mixed Use/Residential Design Guidelines.
1. First floors shall clearly be distinguished from upper floors by a change in materials, colors, and style.
2. All visible building frontages shall be detailed with a similar level of architectural treatment as the primary frontage.
3. Primary building entries shall be accented with strong architectural definition such as distinctive building forms, design elements and materials.
4. Building façades shall include openings, recesses, changes in wall planes, doors, windows, and other elements to avoid large expanses of un-articulated walls.
ORDINANCE NO. 1174
PAGE 20 of 34
5. Articulations shall add three-dimensional interest to the façade and not rely on “false” detailing.
6. Detailing of the building façades shall be integral to the architectural design and a permanent feature of the surface.
7. Building façades shall incorporate architectural detail, recessed widows, awnings, overhands and other elements that relate to the scale of a person.
8. Entrances to residential, office or other upper story uses shall be clearly distinguishable in form and location from retail entrances. b. Building Elevations/Architecture. To ensure that buildings, particularly large structures, are designed with elements that relate to a human scale, the following should be incorporated into the design.
1. Commercial buildings shall be articulated to reflect a small-scale street frontage rhythm, with building bay widths of approximately twenty-five feet.
2. A ground floor retail use should have a minimum floor-to-ceiling height of twelve feet and maximize transparency into the retail space.
3. Where multiple-tenant spaces are incorporated into a building, individual tenant spaces shall be located within the building bays. This can be achieved by any of the following:
A. Placing a column, pier or pilaster between façade elements.
B. Applying vertical slot or recess between façade elements.
C. Providing variation in plane along the building wall.
D. Varying the building wall by recessing the storefront entrance or creating an opportunity for landscaping or pedestrian area.
c. Materials.
1. Within a design theme, a variety of durable material and textures is strongly encouraged. Materials such as granite, marble, polished stones, and other panels should be used as accent materials on the building’s base.
2. In concert with the primary building material(s), a variety of materials is encouraged to articulate different building elements, such as the ground floor façade, the building base, horizontal break bands, pier or column bases, roof terminations, sills, awnings and similar ORDINANCE NO. 1174
PAGE 21 of 34
building components.
d. Roofs. Roof design shall contribute to the overall building design.
1. The form, color and texture of the roofs shall be an integral component of the building design.
2. Roofline ridges and parapets should not run unbroken for more than seventy-five feet.
Vertical or horizontal articulation is required.
3. Roofs should be compatible with the architectural style of the building.
4. The roof shape should reflect the configuration of the building’s mass and volume, and should be consistent in its character from all vantage points.
5. False fronts, applied mansard forms and other artificial rooflines that are not an integral component of the architectural design should be avoided.
6. All buildings shall provide cornice or parapet detailing in order to delineate a strong roofline along the primary façades.
7. Cornices and horizontal bands of genuine materials, such as wood trim rather than foam are strongly encouraged.
8. Reflective roofing materials shall not be used on roof surfaces that are visible from either ground level or elevated viewpoints, such as freeways. e. Windows.
1. Upper story windows shall be detailed with architectural elements, such as projecting sills, molded surrounds and/or lintels.
2. Deeply tinted glass or applied films should be avoided.
3. Windows should maintain consistency in shape and location across the façade.
Unifying patterns should include common windows and doors. The overall effect should create a harmonious pattern along the streetscape.
f. Awnings/Canopies.
1. Awning/canopies over building entries shall be incorporated into the design of the building, including colors and material detailing.
2. Backlighting of transparent or translucent awnings is discouraged.
ORDINANCE NO. 1174
PAGE 22 of 34
3. Awnings on multi-tenant buildings should be the same color and style.
4. Awning design should be consistent with the character and design of the building.
5. The awning material should be compatible with the overall design of the building. The use of vinyl and plastic awnings are discouraged.
g. Exterior Lighting.
1. All exterior lighting should be designed to minimize glare, light trespass, and energy conservation. Full cut-off fixtures, mounting heights, and shielding should be utilized to effectively control glare and light trespass.
2. Pedestrian areas needs to be well-marked and well-lit. Pedestrian scale lighting should be incorporated into plazas, along paths, common open space and other pedestrian areas.
3. Lighting fixtures shall be attractively designed to complement the architecture of the project, signify building entry locations and improve visual identification of residences and businesses.
h. Mechanical Equipment. Rooftops should be designed in a way that acknowledges their visibility from other buildings and the street. Equipment shall be screened on all four sides from both the street and neighboring buildings using parapets. Should parapets not be used the mechanical equipment shall be enclosed within the attic space or ground mounted.
i. Walls.
1. A six-foot high masonry wall shall be constructed along the property line of any lot where construction of any mixed-use development is adjacent to property zoned and used for residential purposes. Breaks in walls may be provided to provide pedestrian access between mixed-use and adjacent residential developments where desired. A perimeter planter, minimum five feet in depth shall be provided along the wall. A landscape planter of one foot shall be provided for block walls facing an alley or public street to deter graffiti.
2. Walls shall have a decorative texture that matches the walls of the development.
3. All walls shall be painted with anti-graffiti coating. j. Service Areas, Refuse Areas and Backflow Preventers.
1. Service areas, garbage receptacles, utility meters and mechanical and electrical equipment shall be located away from streets, pedestrian traffic and activity areas, and ORDINANCE NO. 1174
PAGE 23 of 34
project and building entries.
2. Screening of these areas shall be integrated into the overall building and landscape design.
3. Trash enclosures shall be constructed to match the color, texture and architectural detailing that shall be consistent with the overall site and building design and with a six-foot high wall/gate.
4. Roofs of enclosures should be designed to complement the project buildings, roof style and colors.
5. Where trash compactors are visible, they shall be screened from public view within a trash enclosure or within a building volume.
6. Backflow prevention devices shall be fully screened from public view through the use of landscaping, berms, low walls or other screening techniques. They should be located inside the building where possible.
k. Shared Parking. Two or more uses may share parking facilities, subject to the approval of the community development director and the provisions of this section. A parking demand analysis for the uses proposed to share parking facilities shall be prepared. The parking demand analysis shall be prepared by a registered traffic engineer. When such analysis demonstrates, to the satisfaction of the director, that the uses have different peak parking requirements, then the parking space requirement may be reduced by the director.
In no event, however, shall the parking requirement be reduced below the highest peak parking requirement of the use demanding the most parking. The following conditions shall apply.
1. The uses sharing the parking facilities shall be located on the same lot or contiguous lots.
2. A legal agreement shall be signed by all parties sharing parking facilities. Such agreement shall be approved by the city attorney and community development director, shall be recorded with the Los Angeles County recorder’s office, and shall continue to be valid upon change of ownership of any property subject to the agreement or any lawfully existing building or structure on said properties.
l. Landscaping.
1. Development in the mixed-use overlay should have extensive landscaping of large parking areas, along streetscapes and for pedestrian-oriented spaces. Landscaping can also help to define areas and separate areas thereby bringing a human scale to these intense uses.
ORDINANCE NO. 1174
PAGE 24 of 34
2. Parking lots shall be landscaped to improve the views of parking areas and to help reduce the apparent size and amount of impervious surface as further defined in Section 18.44.050, Note 18.
3. Parking lots, loading and maintenance areas shall be screened to reduce the negative visual impact of parking lots and parked vehicles. Screening also improves the edge of the streetscape and helps to define the street.
4. All landscaping shall comply with the water efficient landscape provisions of Chapter 13.90.
m. Screening of Above-Ground Parking Garages. Parking floors within multi-story parking garages must be screened or concealed by one or more of the following methods:
1. Ground-Floor Retail/Office. When a parking garage is proposed for a street where the predominant use is retail or office, the garage’s ground-level street frontage (except for driveways and pedestrian entrances) must be improved with retail, office or other active use types as permitted by the zoning district.
2. Ground-Floor Residential. Ground-floor residential uses may be used to conceal a parking garage.
3. Landscaping is required for all parking garages (except fully enclosed garages) at ground level or on each street façade above ground-level in the form of perimeter planters with openings and the incorporation of hanging baskets, flower boxes or planting trellises.
4. A parking garage that does not incorporate ground-floor nonresidential or residential use or is not otherwise screened or concealed at street frontages on the ground level, must provide a densely planted landscape perimeter that is a minimum ten feet in depth. n. Maintenance of Buildings, Structures and Parking Lots. All buildings, structures and parking lots shall be maintained to protect the appearance, character and integrity of nonresidential zoned properties and promote a safe and decent environment by establishing minimum standards as they relate to the maintenance of nonresidential buildings and structures.
o. Underground Utilities. All utilities shall be underground and aboveground equipment shall be located away from major pedestrian streets and corners. Equipment boxes and vaults must be placed in back of the sidewalk and where landscaping can minimize or screen their impact.
p. Usable Open Space Defined. Usable open space areas are an open area or an indoor or outdoor recreational facility which is designed and intended to be used for outdoor living and/or recreation. Usable open space shall not include any portion of parking areas, streets, ORDINANCE NO. 1174
PAGE 25 of 34
driveways, sidewalks, or turnaround areas.
q. The following standards shall apply to the requirements for open space:
1. Private Residential Open Space.
A. For stand-alone multi-family residential projects or as part of a mixed-use development, each residential unit shall be provided with at least one area of private open space accessible directly from the living area of the unit, in the form of a fenced yard or patio, a deck or balcony at a minimum area of one hundred fifty square feet per unit for 1st floor units or one hundred square feet per unit for upper floors. (Mechanical equipment may not be located within the open space area.)
B. The minimum dimension, width or depth, of a patio, deck or balcony shall be six feet.
C. The minimum dimension, width or depth of a yard shall be ten feet.
2. Common Residential Open Space.
A. For stand-alone multi-family residential developments of over twenty units, each residential unit shall be provided with at least two hundred square feet of common residential open space.
B. All common open space shall be conveniently located and accessible to all dwelling units on the site.
C. Common open space areas may include landscaping, pedestrian paths, and recreational facilities. These recreational facilities could include:
i. Clubhouse.
ii. Swimming pool.
iii. Tennis court (one per court).
iv. Basketball court (one per court).
v. Racquetball court (one per court).
vi. Weightlifting facility.
vii. Children’s playground equipment.
viii. Sauna.
ORDINANCE NO. 1174
PAGE 26 of 34
ix. Jacuzzi.
x. Day care facility (two).
xi. Other recreational amenities deemed adequate by the community development director.
D. In projects containing twenty or more units, the minimum width and depth shall be twenty feet.
r. This section provides operational and compatibility standards for the development of live/work units within the mixed-use overlay.
1. Allowed Uses.
A. The nonresidential component of a live/work unit shall only be a nonresidential use allowed within a mixed-use overlay zone, except that certain uses are determined to not be appropriate within a residential environment and are therefore prohibited as provided in subsection B, below.
B. The residential component of a live/work unit shall only be a residential use allowed within the MU overlay zone.
2. Any use or activity not identified in Table 18.40.040, or any use or activity not interpreted by the community development director, shall be prohibited.
3. Site Planning and Design Standards.
A. Each live/work unit fronting a public right-of-way shall have a pedestrian-oriented frontage.
B. Each live/work unit shall have a clearly identified, separate access from other live/work units within the structure or development. Access to individual units shall be from common access areas, parking lots, or walkways. Access to each unit shall be clearly identified to provide for emergency services.
C. The living space within the live/work unit shall be contiguous with the working space, with direct access between the two areas.
4. Operational Standards.
A. No portion of a live/work unit shall be separately sold or rented.
B. The owner or developer of a structure containing live/work units shall provide written ORDINANCE NO. 1174
PAGE 27 of 34
notice to all occupants, tenants, and users that the surrounding area may be subject to higher impacts associated with nonresidential uses (e.g., noise) than exist in more predominantly residential areas.
C. All activities related to the “work” component of a live/work unit shall be conducted within a completely enclosed building.
D. Up to two additional persons who do not reside in the live/work unit may work in the unit.
E. Client and customer visits to live/work units are allowed.
F. A live/work unit shall not be converted to either entirely a residential use or entirely a nonresidential use.
G. A live/work unit shall be limited to forty percent office or commercial use of floor area within a mixed use development.
H. A live/work use may display a window or building-mounted sign up to a maximum of five percent of the building frontage area used for commercial purposes. Signs shall not be illuminated, including neon signs.
s. Signage. All development within the mixed-use overlay zone shall have a “sign program” as part of the project design. The sign program shall identify the location for all signage that may be located on the building or freestanding, the allowable sign materials, lighting methods and sign design. The sign program will also require coordination for multiple buildings within a defined complex. In addition, temporary signs and banners will be included in the sign program, as to whether or not they are allowed, and if they are allowed, then where these signs may be located within the development project. At no time, shall the sign program allow for signage in excess of those standards within Chapter 18.46 (Signs and Advertising). “Box” signs, “canister” or “can” signs, painted signs, foam letters and neon signs are prohibited.
Note 64. Objective Design Standards for Multi-family, Mixed-Use Development. The objective Design Standards shall apply to all ministerial reviews per state housing law.
a. Site Design. Site planning refers to the arrangement of-and relationships between buildings, parking areas, common and private open space, landscaping and pedestrian connections.
1. Building entries shall be visible at the street and shall incorporate a minimum of one (1) of the following:
A. A projection (e.g., porch) or recess, or combination of projection and recess with minimum area of 50 square feet.
B. A change in roof pitch or form, such as a gable, that extends a minimum of ORDINANCE NO. 1174
PAGE 28 of 34
one foot past the sides of the door jamb.
C. A difference in roof height of at least one (1) foot.
2. All building entries shall incorporate wood, stone, tile, or brick accent materials covering a minimum of 30 percent of the entryway wall surface area, inclusive of windows and doors.
3. Shared entries for larger residential buildings shall be through a prominent entry lobby or courtyard facing the street.
4. Buildings that are not adjacent to a street shall have front entries that are oriented to interior common areas such as paseos, courtyards, and useable open space.
5. Where applicable, active commercial uses, including retail, restaurant, and personal services shall be located on the ground floor fronting the sidewalk.
6. Where applicable, private amenities, such as plazas and open space shall be located in the interior of the site or otherwise away from the public right of way.
7. All structures, entries, facilities, amenities, and parking areas shall be internally connected with pedestrian pathways.
8. Direct pedestrian access shall be provided between the public sidewalk and primary building entrance.
9. Direct pedestrian access shall be provided between any back of house retail entry and the public sidewalk and between mid-block courtyard space and surface parking.
10.Garage Doors. For projects containing five (5) or more units, garage doors shall not face a public street(s) but may be oriented toward an alley or a private street/driveway that is internal to the project. All garage doors shall be recessed a minimum of six (6) inches from the surrounding building wall and shall include trim of at least one and a half (1.5) inches in depth.
b. Building Form, Massing and Façade Articulation. The design shall incorporate building form, massing and façade articulation of individual units, or groups of units, through varied heights, projections, setbacks, and recesses. Materials and colors emphasize changes and hierarchy in building form
1. Treat the ground floor with materials such as stone, concrete, or other similar masonry or cementitious materials that are distinct from the remainder of the structure.
2. All exterior building façades visible from the primary street shall not extend more than 30 feet in length without either an architectural element or a five-foot variation in depth in the wall plane. In addition, all facades shall include at least two of the following features: windows, trellises, arcades, balconies, different exterior material, or awnings.
3. Buildings shall be designed and articulated with details articulation, materials, and elements on all sides. The street- facing façade(s) shall feature additional elements or materials. Entirely blank walls are not allowed along any façade.
4. Architectural window detailing, such as sills, trim, and/or awnings shall be provided.
5. Windows located on upper floors within 15 feet of an adjacent structure shall ORDINANCE NO. 1174
PAGE 29 of 34
utilize one or more of the following techniques to minimize privacy impacts on adjacent properties and/or structures:
a. Use clerestory windows located at a minimum height of 5 feet measured from the finished floor;
b. Use of non-transparent or frosted glazing.
6. Locate the taller portions of residential projects away from adjoining residential properties, in order to provide height transitions between taller and lower buildings, and to maximize light, air, and privacy for units. c. Corner Buildings
1. Treatment of Corner Buildings. Corner buildings, end units of townhouses or other attached housing that face the street shall include the following features on their building frontage:
A. A minimum of 30 percent fenestration area.
B. At least one facade modulation with a minimum depth of 18 inches and a minimum width of two feet. Examples: Wrap around front porch, bay window.
C. A different material application, color or fenestration pattern of windows from the rest of the façade.
d. Roof and Parapets
1. Roofs shall consist of a single style and slope throughout the project. On a building with a pitched roof, no portion of the main roof shall be flat.
2. Parapets shall be capped with precast treatment, continuous banding, or projecting cornices, dentils, or similar edge treatment.
3. Where rooftop equipment is located within 10 feet of a roof edge, a parapet shall be provided that is a minimum of six inches taller than all roof-top equipment.
4. Interior side of parapet walls shall not be visible from a common open space or public right-of-way.
5. Parapet material shall match the building façade.
e. Materials and Colors
1. Affordable units and market rate units within the same development shall be constructed of the same materials and details such that the units are not distinguishable from one another.
2. The primary exterior siding material for buildings shall be wood, composite wood, stone, stone veneer, granite, slate, brick, brick veneer, stucco, plaster, fiber cement, vinyl, aluminum, or steel. The use of exposed plywood or glass curtain walls is prohibited.
3. A neutral color, such as beige, tan, cream, sand, light gray, etc., shall be the dominant wall color, bolder colors may be used if City staff determines they are consistent with the character of the project, surrounding properties, and/or the streetscape. Material with integral color, such as brick, shall be left natural.
ORDINANCE NO. 1174
PAGE 30 of 34
4. Changes in material or color shall occur at inside corners of intersecting walls or at architectural features that break up the wall plane, such as columns. f. Windows and Doors
1. Windows and doors shall be located so they do not directly align with windows and doors of adjacent dwelling units.
2. Windows shall either be recessed at least three inches from the plane of the surrounding exterior wall or shall have a trim or windowsill at least one-half inch in depth.
3. Windows facing a public street shall feature enhanced window treatments, such as decorative architectural brackets, trim, shutters, awnings, and/or trellises. g. Fences and Wall- Site walls shall be constructed to match the primary building colors and materials. Fences and walls shall be constructed of materials such as wood, vinyl, wrought iron, brick, and stone. Chain link is prohibited. For additional regulations see 18.42.050 Note 32
1. Both sides of all perimeter walls and fences shall be architecturally treated.
Walls shall be finished with a trim cap.
2. Where fences and walls of different materials or finishes intersect, a natural transition or break (such as a column or pilaster) shall be provided.
3. All walls shall be painted with anti-graffiti coating. h. Parking Design
1. Parking areas shall be located behind or within the building or buildings so that it is not visible from the primary street frontage.
2. Vehicle access shall be located on alleys or side streets where available.
3. Paving treatment using patterned and/or colored pavers, brick, or decorative colored and/or scored concrete shall be used for entrance driveways, a minimum of 15 feet in length, and spanning the width of the entrance driveway.
4. Projects with controlled entrances, including vehicular access gates to parking areas, shall accommodate at minimum the length of one vehicle (20 feet) entering the site without queuing into the street or public sidewalk. i. Landscaping. Landscaping shall be used for all outdoor areas that are not specifically used for parking, driveways, walkways, and open space.
1. Landscaping must comply with Chapter 13.90, Water Efficient Landscape Ordinance (WELO), where applicable.
2. Plant materials are limited to native or non-invasive drought-tolerant species.
3. A landscape buffer of minimum width of five feet shall be located between all ground-level restricted open spaces and pedestrian walkways. The buffer shall be planted with dense evergreen shrubs and/or vines which grow to or are maintained at a minimum height of four feet.
ORDINANCE NO. 1174
PAGE 31 of 34
4. Rear and side lot lines adjoining residential properties shall provide a minimum 5 feet wide landscape planter with a combination of trees and bushes to provide a privacy buffer.
5. Pedestrian walkways shall be flanked on both sides with landscaping, and shall include a mix of turf, groundcover, and shrubs. Both sides of walkways shall provide trees which shall be spaced to shade at least 25 percent of the overall walkway length at maturity.
6. A minimum of one 15-gallon tree or equivalent box size and 10 five-gallon shrubs shall be planted for every 1,000 square feet of required landscape area.
7. Groundcover shall be sized and located to cover at least 75 percent of all landscape areas that are not planted with shrubs or trees within 5 years of installation.
8. Artificial or synthetic plants, except for turf, are prohibited. Artificial turf is not permitted in front or street side setbacks.
9. Landscaping shall not obstruct solar access to adjacent solar collectors for water heating, space heating or cooling, or electricity generation. j. Lighting
1. All entryways, porch areas, pedestrian pathways, parking areas, and gates shall include lighting for safety and security. Lighting shall be fully shielded, directed downward (not above the horizontal plane), and shall not spill onto adjacent properties.
2. The average maintained lighting levels for mixed-use and multi-family units shall not exceed the following:
a. 0.5 foot-candles at lot line boundaries.
b. 1.0 foot-candles at buildings, parking lots or other areas.
3. Lighting shall not spill beyond the intended area and shall not extend across a property line.
k. Usable Open Space Defined. Usable open space areas are an open area or an indoor or outdoor recreational facility which is designed and intended to be used for outdoor living and/or recreation. Usable open space shall not include any portion of parking areas, streets, driveways, sidewalks, or turnaround areas. The following standards shall apply to the requirements for open space:
1. Private Residential Open Space.
i. For stand-alone multi-family residential projects or as part of a mixed-use development, each residential unit shall be provided with at least one area of private open space accessible directly from the living area of the unit, in the form of a fenced yard or patio, a deck or balcony at a minimum area of one hundred fifty square feet per unit for 1st floor units or one hundred square feet per unit for upper floors. (Mechanical equipment may not be located within the open space area.)
ORDINANCE NO. 1174
PAGE 32 of 34
ii. The minimum dimension, width or depth, of a patio, deck or balcony shall be six feet.
iii. The minimum dimension, width or depth of a yard shall be ten feet.
2. Common Residential Open Space.
A. For stand-alone multi-family residential developments of over twenty units, each residential unit shall be provided with at least two hundred square feet of common residential open space.
B. All common open space shall be conveniently located and accessible to all dwelling units on the site.
C.Common open space areas may include landscaping, pedestrian paths, and recreational facilities. These recreational facilities could include:
i. Clubhouse.
ii. Swimming pool.
iii. Tennis court
iv. Basketball court
v. Racquetball court
vi. Weightlifting facility.
vii. Children’s playground equipment.
viii. Sauna.
ix. Jacuzzi.
x. Day care facility
xi. Other recreational amenities deemed adequate by the community development director.
D. In projects containing over twenty units, the minimum width and depth shall be twenty feet.
E. Where roof decks are proposed, landscape planters such as planter boxes, potted plants, and/or boxed trees, shall be located along the edges of the roof deck to provide a screening buffer.
F. For mixed-use developments, the open space provided for residents must be secured and accessible only from the residential area of the project. Publicly accessible open space such as plazas and courtyards does not count open space for residential uses.
l. Trash Enclosure- Service areas, garbage receptacles, utility meters and mechanical and electrical equipment shall be located away from streets, pedestrian traffic and activity areas, and building entries. Screening of these areas shall be integrated into the overall building and landscape design.
1. Trash enclosures shall be constructed to match the color, texture and architectural detailing that shall be consistent with the overall site and building design and with a six-foot high wall/gate.
ORDINANCE NO. 1174
PAGE 33 of 34
2. Roofs of enclosures shall be designed to complement the project buildings, roof style and colors.
3. Where trash compactors are visible, they shall be screened from public view within a trash enclosure or within a building.
m. Mechanical Equipment- Rooftop equipment that is not able to be concealed within the architecture of the building shall be screened from view behind a parapet wall.
If parapets are not be used, the mechanical equipment shall be enclosed within the attic space or ground mounted.
1. Above-ground utilities, transformers, and other mechanical equipment placed behind the front yard setback shall be screened from view by a solid fence, wall, or landscaping.
2. Backflow prevention devices shall be fully screened from public view through the use of landscaping, berms, low walls or other screening techniques. They shall be located inside the building where possible.
3. All wall mounted utility elements shall be located to ensure they are concealed from public view. All flashings, sheet metal, vents, exhaust fans/ventilators, and meter boxes shall be painted to match building wall material and/or color. n. Signage. All development within the R-40 Overlay Zone shall have a “sign program” as part of the project design. The sign program shall identify the location for all signage that may be located on the building or freestanding, the allowable sign materials, lighting methods and sign design. The sign program will also require coordination for multiple buildings within a defined complex. In addition, temporary signs and banners will be included in the sign program, as to whether or not they are allowed, and if they are allowed, then where these signs may be located within the development project. At no time, shall the sign program allow for signage in excess of those standards within Chapter 18.46 (Signs and Advertising). “Box” signs, “canister” or “can” signs, painted signs, foam letters and neon signs are prohibited.
o. Mixed-Use Standards.
1. The ground floor of a mixed-use building shall have a minimum floor height of 12 feet, measured from finished ground floor to the bottom of the finished second floor.
2. Exterior walls facing a public street shall include transparent windows and doors for at least 50 percent of the building wall area located between three and seven feet above the elevation of the sidewalk. Parking garages are not required to meet the ground floor transparency requirement.
SECTION 11. If any section, subsection, subdivision, paragraph, sentence, clause ORDINANCE NO. 1174
PAGE 34 of 34
or phrase of this article, or any part thereof, is for any reason held to be unconstitutional or invalid or ineffective by any court of competent jurisdiction, such decision shall not affect the validity or effectiveness of the remaining portions of this article or any part thereof. The City Council hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause or phrase of this article irrespective of the fact that one or more sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases be declared unconstitutional or invalid or ineffective. To this end, the provisions of this article are declared to be severable.
SECTION 12. The City Clerk shall certify to the passage and adoption of this Ordinance, and it shall take effect thirty (30) days after its passage.
APPROVED AND ADOPTED this ____ day of _____ 2023.
________________________________
Erik Lutz, Mayor
ATTEST: APPROVED AS TO FORM:
________________________________ _________________________________ Cynthia Ayala, Jr. Deputy City Clerk Arnold M. Alvarez-Glasman, City Attorney
STATE OF CALIFORNIA )
) §
COUNTY OF LOS ANGELES )
I, Cynthia Ayala, Jr. Deputy City Clerk of the City of Pico Rivera, do hereby certify that the foregoing Ordinance No. ____ was adopted at a regular meeting of the City Council of the City of Pico Rivera, held on __________________, with the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________
Cynthia Ayala, Jr. Deputy City Clerk
To: Mayor and City Council
From: City Manager
Meeting Date: September 12, 2023
Subject: MEMORANDUM OF UNDERSTANDING WITH THE PICO
RIVERA CHAMBER OF COMMERCE
Recommendation:
1. Approve a Memorandum of Understanding (MOU) between the City and the Pico Rivera Chamber of Commerce for fiscal year (FY) 2023-24.
Fiscal Impact:
The total cost of $40,000 has been included in the FY 2023-24 adopted budget within the General Fund (Account No. 100.30.3000-54100).
Discussion:
Since the City of Pico Rivera’s (City) incorporation in 1958, the City has been working cooperatively with the Chamber of Commerce (Chamber) to provide opportunities as a dedicated resource for the City’s business community. This partnership has been memorialized in an agreement between the two (2) entities in the form of an MOU (Enclosure 1). Included in this MOU is a list of services the Chamber will provide to the Pico Rivera business community through June 30, 2024. Services include facilitation of grand openings, advertising, publicizing, distribution of educational materials, marketing special events and local business support necessary to stimulate the local economy.
As part of the MOU maintenance and oversight, staff reviews quarterly performance and accomplishments. Payment to the Chamber occurs in installments of $10,000 per quarter and only upon compliance with conditions outlined in the MOU. The MOU between the entities requires the Chamber to submit quarterly invoices with a report of activities to the City for disbursement.
The partnership with the Chamber represents an investment in the Pico Rivera business community. Through Chamber functions, they provide programming for networking, 6 CITY COUNCIL AGENDA REPORT – MEETING OF SEPTEMBER 12, 2023
MEMORANDUM OF UNDERSTANDING WITH THE PICO RIVERA CHAMBER OF