Background:
In June 2017, the City of Pico Rivera (City) approved a Purchase and Sale Agreement with Southern California Edison (SCE) for the acquisition of 2,937 eligible SCE-owned streetlights. In January 2019, the City issued a Request for Proposal for Streetlight Acquisition, LED Conversion, and ongoing operation and maintenance. On March 26, 2019, the City Council awarded a three (3) year contract with Tanko Lighting Inc. (Tanko) ending on March 26, 2022. This contract included a provision to extend the contract for an additional three (3) years upon mutual agreement by the parties. On April 22, 2022, the City Council approved the provision to extend the contract to March 2025.
On March 11, 2025, City Council approved an agreement with Tanko Lighting (Tanko) for the maintenance and emergency services for the City’s streetlights through March 11, 2028, for an annual amount of $305,000.
Discussion:
When the City entered into its agreement with Tanko Lighting, budget projections were developed using historical data available at the time, including the average annual number of streetlight pole knockdowns resulting from traffic collisions, anticipated standby maintenance costs, and routine material requirements necessary to maintain the City's streetlight system. Since the agreement's execution, actual service demands have substantially exceeded those original projections, creating an immediate and unforeseen need for additional funding to maintain the City's streetlight infrastructure in a safe and operational condition.
Since July 1, 2025, the City has experienced nineteen (19) streetlight pole knockdowns, significantly exceeding the original estimate of approximately one pole knockdown per month. These incidents have primarily occurred along major arterial roadways, where functional streetlighting is critical to maintaining visibility, reducing traffic hazards, and ensuring the safety of motorists, pedestrians, and bicyclists. The severity of these collisions has varied considerably, with nine (9) incidents requiring complete foundation replacement in addition to pole replacement. Furthermore, several collisions caused secondary damage to adjacent streetlight infrastructure, resulting in repair costs that were two to three times greater than originally anticipated. These circumstances have accelerated expenditures beyond budgeted levels and created a backlog of necessary repairs that must be addressed to preserve public safety.
In addition to collision-related damage, the City has experienced a notable increase in streetlight vandalism and theft. These incidents include copper wire theft, unauthorized tampering to obtain electrical power, and physical damage to poles and electrical components. Such activity frequently occurs within commercial corridors and areas with limited nighttime pedestrian activity, resulting in prolonged outages if repairs are not CITY COUNCIL AGENDA REPORT – MEETING OF JUNE 9, 2026
AMENDMENT NO. 1 TO MAINTENANCE SERVICES AGREEMENT NO. 25-2428 WITH TANKO LIGHTING INC.
completed promptly. Damaged or inoperable streetlights create darkened areas that reduce visibility, increase safety concerns for residents and businesses, and heighten the City's potential liability exposure. Upon receiving reports of vandalism or outages, City staff coordinate with Tanko Lighting to assess the damage and implement repairs as quickly as possible to restore lighting and reduce associated risks.
Although the City diligently pursues insurance reimbursement for eligible collision-related repairs, processing insurance claims often takes several months before reimbursement funds are received. Given the critical nature of these repairs and the public safety risks associated with delayed response, the City cannot defer restoration work while awaiting claim settlements. As a result, repair and replacement activities are routinely performed before receiving insurance proceeds, placing additional strain on available maintenance funding.
The need for this amendment has also been driven by the ongoing challenges associated with aging infrastructure. Over time, streetlight systems deteriorate, affecting poles, foundations, wiring, and electrical components. The City has encountered increasing instances of pole decay, damaged underground and overhead wiring, and other infrastructure deficiencies that require immediate corrective action to maintain system reliability. Addressing these deficiencies is essential to preventing extended outages, maintaining adequate roadway illumination, and ensuring that the City's streetlight network continues to operate as intended.
At present, the City has several pending repairs and streetlight replacement projects that require immediate attention. Without additional funding, these repairs will be delayed, resulting in prolonged outages, increased safety concerns, heightened liability exposure, and further deterioration of critical public infrastructure. Approval of this amendment will provide the resources necessary to procure materials, authorize repairs, and maintain uninterrupted streetlight maintenance services through June 30, 2026. Most importantly, it will ensure that the City can continue to provide safe, reliable, and properly illuminated public roadways, commercial corridors, and pedestrian areas for residents, visitors, and businesses.
The additional expenditures are as follows:
ITEMS APPROXIMATE
COST
Pending Streetlight Pole Replacements $96,000
Outstanding Invoices (from theft and vandalism) $42,000 Infrastructure Deficiencies $16,000
TOTAL $154,000
Authorizing this amendment to the agreement will enable Tanko to continue responding CITY COUNCIL AGENDA REPORT – MEETING OF JUNE 9, 2026
AMENDMENT NO. 1 TO MAINTENANCE SERVICES AGREEMENT NO. 25-2428 WITH TANKO LIGHTING INC.
to emergency repairs, restore damaged infrastructure, address existing service backlogs, and maintain safe streetlight operations throughout the City. For emergency services related to traffic accidents, the City will continue to actively pursue recovery of residual costs from the respective insurance companies to offset repair costs.
Conclusion:
Staff recommend approval of Amendment No. 1 to Agreement No. 25-2428 with Tanko Lighting Inc., to increase the existing contract amount by $154,000, to a not-to-exceed amount of $459,000 for FY 2025-26. Additionally, it is recommended to amend the FY 2025-26 Adopted Budget of the Lighting Assessment District Fund (Fund 230) in the amount of $154,000 to provide streetlight maintenance services for this fiscal year and to fund the installation of streetlight pole replacements, repairs, and continued maintenance services.
Steve Carmona
SC:NN:ML:np
Enclosure: 1) Amendment No. 1
AMENDMENT NO. 1
TO THE MAINTENANCE SERVICES AGREEMENT
WITH TANKO LIGHTING INC., AGREEMENT NO. 25-2428
THIS AMENDMENT NO. 1 TO AGREEMENT NO. 25-2428 FOR MAINTENANCE SERVICES WITH TANKO LIGHTING, INC. (“Amendment No. 1”), effective as of the date specified in paragraph 7 hereof, is made and entered into by and between the CITY OF PICO RIVERA (“CITY”) and Tanko Lighting, Inc. (“CONTRACTOR”).
RECITALS
A. CITY and CONTRACTOR (collectively referred to as the “PARTIES”) have previously executed that certain Agreement for Maintenance Services, Agreement No. 25-2428 (“Agreement”) relating to streetlight maintenance and repair services in the City of Pico Rivera.
B. The PARTIES desire to amend said Agreement as set forth herein, pursuant to Section 7 of the Agreement.
NOW, THEREFORE, THE PARTIES AGREE AS FOLLOWS:
1. INCORPORATION OF RECITALS.
The foregoing recitals are true and correct and hereby incorporated into this Agreement.
2. MODIFICATION OF CONTRACTOR’S COMPENSATION.
The compensation to be paid by CITY to CONTRACTOR for the modified work and services identified in this Amendment No. 1 shall be amended to read as follows:
The City shall compensate CONTRACTOR for the services provided under this Agreement, and CONTRACTOR shall accept in full satisfaction for such services, payment in accordance with the CONTRACTOR’S approved Exhibit B for an amount not to exceed $459,00 (Four Hundred Fifty Nine Thousand Dollars) for fiscal year 2025-26, for a total agreement amount not to exceed $1,069,000 (One Million Sixty-Nine Thousand Dollars).
3. EFFECT OF AMENDMENTS.
Except as modified herein, either expressly or by necessary implication, the terms and provisions of the Agreement between the CITY and CONTRACTOR shall remain in full force and effect.
Enclosure 1
10a
Back to Agenda Outline
Amendment No. 1 to Maintenance Services Agreement No. 25-2428 TANKO LIGHTING INC.
4. EFFECTIVE DATE.
Unless otherwise specified herein, this Amendment No. 1 shall become effective as of the date set forth below on which the last of the parties, whether CITY or CONTRACTOR, executes this Amendment No. 1.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to be executed and attested by their respective officers hereunto duly authorized. “CITY” “CONTRACTOR”
CITY OF PICO RIVERA Tanko Lighting, Inc.
Steve Carmona, City Manager Jason Tanko, Chief Executive Officer Dated: Dated:
ATTEST: APPROVED AS TO FORM:
Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney To: Mayor and City Council
From: City Manager
Meeting Date: June 9, 2026
Subject: CONFLICT OF INTEREST CODE BIENNIAL REVIEW
Recommendation:
1. Direct the City Clerk’s Office to notify City Departments and applicable Agencies to review their Conflict-of-Interest Code pertaining to designated employees to determine if any changes or amendments are necessary.
Strategic Priority:
1 - Fiscal & Organizational Sustainability - Create a City government build to adapt to change
Strategy:
1.1 Build a more transparent and sustainable fiscal system to improve trust and efficiency.
Fiscal Impact:
There is no fiscal impact on the General Fund.
Background:
The Political Reform Act requires a biennial review of the City’s Code in even-numbered years (Government Code Section 87306.5). The City’s Code requires designated officials and employees to disclose sources of income, interests in real property, investments and business positions if such interests are located within the jurisdictional boundaries of the City of Pico Rivera.
Discussion:
The City Council must notify City departments and agencies not covered under the City’s Conflict-of-Interest Code (Code) to review its Code no later than July 1 of each even numbered year and submit a biennial notice to the City Council by October 1, 2026. 11 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF JUNE 9, 2026
CONFLICT OF INTEREST CODE BIENNIAL REVIEW
The Council action taken at this meeting represents the first step in the Code review process. As directed by City Council, the Code will be reviewed to determine whether the position classifications and/or disclosure categories are accurate and up to date. Staff will then notify the City Council of any required amendments and present the City Council with an updated Conflict-of-Interest Code for Council review and approval. A proposed amended Code is not effective until approved by the City Council.
Steve Carmona
SC:CA:gsm
To: Mayor and City Council
From: City Manager
Meeting Date: June 9, 2026
Subject: CANCELLATION OF REGULAR CITY COUNCIL MEETINGS OF AUGUST 11, 2026, AND AUGUST 25, 2026
Recommendation:
1. Approve the cancellation of the August 11, 2026 and August 25, 2026 City Council Regular meetings; and
2. Direct the City Clerk to post a Notice of Cancellation for both meetings.
Strategic Priority:
1 - Fiscal & Organizational Sustainability - Create a City government build to adapt to change.
Strategy:
1.3 Improve organizational effectiveness to reduce costs and streamline efforts.
Fiscal Impact:
There is no fiscal impact to the General Fund associated with the recommended actions.
Background:
On September 8, 2015, the City Council approved and passed Resolution No. 6827, which states that the second meetings of July, November, and December will be cancelled. This decision was made in consideration of vacations and holiday schedules.
Since the adoption of Resolution No. 6827, the responsibilities and demands placed on both the City Council (Council) and City staff (staff) have evolved. In recent years, Council and staff have become increasingly involved in regional partnerships, training opportunities, conferences, and other initiatives that require travel and participation outside of regular City operations. As a result, the proposed meeting cancellations would not only continue to accommodate vacation and holiday schedules but would also provide 12 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF JUNE 9, 2026
CANCELLATION OF REGULAR CITY COUNCIL MEETINGS OF AUGUST 11, 2026, AND AUGUST 25, 2026
Council and staff with additional time to advance high-priority projects, programs, and strategic initiatives during the summer months. This additional flexibility helps ensure that important work can continue efficiently without conflicting with scheduled Council meetings.
Discussion:
After conferring with City staff, City Management has determined that canceling the August City Council meetings will not affect City services or delay important City business.
Any items that need City Council review can be brought forward at the next regular meeting on September 8, 2026. If an urgent matter comes up during the break, a special meeting can be scheduled.
Residents will still have opportunities to participate in local government during the recess.
Public comments may be submitted to the City Clerk’s Office and will be included in the record at the next regular City Council meeting. Community members are also encouraged to connect with City Council Members at summer programs, community events, and other City activities.
The City is committed to being responsible, transparent, and efficient. The proposed meeting recess provides Council Members and staff with a planned break while ensuring that important City business can continue when needed.
Conclusion:
It is recommended that the City Council authorize the cancellation of the August 11, 2026 and August 25, 2026 City Council regular meetings and direct the City Clerk to post a Notice of Cancellation for both meetings ensuring that the necessary posting and noticing requirements are met and that a timely communication about the recess has been provided to the public.
Steve Carmona
SC:CA:gsm
To: Mayor and City Council
From: City Manager
Meeting Date: June 9, 2026
Subject: PICO RIVERA MAJOR CORRIDORS MEDIAN AND PARKWAY BEAUTIFICATION PROJECT, CIP NO. 50075, CCL-5351(041) –
NOTICE OF COMPLETION
Recommendation:
1. Accept the work as completed for the Pico Rivera Major Corridors Median and Parkway Beautification Project, CIP No. 50075, CCL-5351(041) constructed by Urban Habitat and authorize the City Clerk to file the Notice of Completion with the Los Angeles County Registrar-Recorder; and
2. Authorize the City Manager to release the retention and all other monies due to Urban Habitat, following the mandatory waiting period from the date the Notice of Completion is recorded.
Strategic Priority:
3 - Infrastructure - Plan, fund, build, and maintain reliable and cost-effective infrastructure that contributes to enhancing quality of life.
Strategy:
3.3 Complete construction of necessary infrastructure projects to implement master plans in a timely manner.
Fiscal Impact:
This project has total budget of $8,726,557, as detailed in the table next page. The total estimated project expenditure is approximately $7,935,000. The remaining balance will be unencumbered and returned to the respective funding sources for future capital projects. No additional appropriation is necessary at this time. 13 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF JUNE 9, 2026
PICO RIVERA MAJOR CORRIDORS MEDIAN AND PARKWAY BEAUTIFICATION PROJECT, CIP NO. 50075, CCL-5351(041) – NOTICE OF COMPLETION
Discussion:
In 2022, the City of Pico Rivera was successful in securing grant funding for two (2) projects under the Clean California Local Grant Program, Cycle 1: the Major Corridors Median and Parkway Beautification Project and the Rosemead Boulevard Median and Parkway Beautification Project. This report pertains solely to the completion of the Pico Rivera Major Corridors Median and Parkway Beautification Project, CIP No. 50075. A separate agenda report will be presented to address the completion of the Rosemead Boulevard Median and Parkway Beautification Project.
The Pico Rivera Major Corridors Median and Parkway Beautification Project, CIP No. 50075, was designed in 2022, publicly advertised and competitively bid in 2023, and construction commenced in late 2023. Construction activities reached completion in December 2025. The project was delivered within the approved budget, with a total estimated construction cost of $7,935,000. This amount includes approved change orders necessary to address unforeseen field conditions, including but not limited to, additional boring, soil amendments, tree removals, installation of new trees, and removal and disposal of unsuitable soils. Due to unforeseen issues affecting several planted trees along Paramount Boulevard and Slauson Avenue, additional tree remediation work is currently underway, along with the remediation of monument lighting fixtures.
A summary of the overall project budget and estimated expenditures is provided below:
Budget Funding Source Total
Clean California Grant (Fund 699) $4,216,167
Capital Improvement Fund (Fund 400) $985,390
Proposition A (Fund 205) $100,000
Proposition C (Fund 206) $1,975,000
Measure R (Fund 207) $1,350,000
Measure W (Fund 209) $100,000
Total Funding: $8,726,557
Project Activity Amount
Design $ 311,100
Construction $ 6,606,822
Construction Change Orders $ 547,000
Construction Management and Inspection $ 383,000
Project Administration $ 87,078
Total Estimated Project Cost $ 7,935,000
CITY COUNCIL AGENDA REPORT – MEETING OF JUNE 9, 2026
PICO RIVERA MAJOR CORRIDORS MEDIAN AND PARKWAY BEAUTIFICATION PROJECT, CIP NO. 50075, CCL-5351(041) – NOTICE OF COMPLETION
The total estimated project cost is considered substantially complete; however, some additional expenditures are anticipated as staff finalizes the remaining administrative and closeout activities associated with the project.
Conclusion:
Staff recommend accepting the project as complete, authorizing the filing of a Notice of Completion with the Los Angeles County Registrar-Recorder’s Office and releasing the retention payment to Urban Habitat following the statutory waiting period, provided no claims are filed within 35 days after recordation.
Steve Carmona
SC:NN:NC:np
Enclosure: 1) Notice of Completion
RECORDING REQUESTED BY
NAME: ____________________________________________________ WHEN RECORDED MAIL TO:
NAME: _________________________________________________ ADDRESS: _________________________________________________ CITY / STATE / ZIP: ____________________________________________ (DOCUMENT WILL ONLY BE RETURNED TO NAME & ADDRESS IDENTIFIED ABOVE) (SPACE ABOVE FOR RECORDER’S USE)
____________________________________________________________________________________ (DOCUMENT TITLE)
SEPARATE PAGE, PURSUANT TO CA. GOV’T. CODE 27361.6
Genevie Martinez
City of Pico Rivera
6615 Passons Blvd.
Pico Rivera, CA 90660
Notice of Completion
13a
Enclosure 1
2. The full name of the owner is
3. The full address of the owner is
4. The nature of the interest or estate of the owner is: in fee.
NAMES ADDRESSES
NAMES ADDRESSES
7. A work of improvement on the property hereinafter described was completed on The work done was:
8. The names of the contractor, if any, for such work of improvements was
9. The property on which said work of improvement was completed is in the City of County of , State of , and is described as follows:
10. The street address of said property is:
City of Pico Rivera
Dated:
City Manager,
(Personal signature of the individual who is swearing that the contents of the Notice of Completion are true) I, the undersigned, say: I am the ___________________________, the Declarant of the foregoing Notice of Completion; I have (President of, Manager of, Partner of, Owner of, Etc.)
read said Notice of Completion and know the contents thereof; the same is true to my own knowledge. I declare under penalty of perjury that the foregoing is true and correct.
Executed on ___________________________, 20___ at ________________________________, __________.
6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements therein reffered to:
(If no street address has been officially assigned, insert "none".) (Signature of Owner or coporate officer of Owner named in paragraph 2, or his agent)
VERIFICATION
NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. (See reverse side for complete requirements.) Notice is hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described. (If other than Fee, strike "in fee" and insert, for example, "purchaser under contract of purchase," or "lessee")
5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are:
City of Pico Rivera
6615 Passons Boulevard, Pico Rivera, California 90660
6615 Passons Boulevard, Pico Rivera, California 90660
Los Angeles
Pico Rivera
CA
City Clerk
Steve Carmona
23 Urban Habitat
December 2025
Beautification of median islands along Slauson Ave, Paramount Blvd, Washington Blvd & Whittier Blvd.
Pico Rivera - Major Corridors Median and Parkway Beautification Project, CIP No. 50075, CCL-5351(041) Improvements include new trees,
shrubs, cobblestone, mulch, irrigation system, art elements, entrance monuments, solar lighting, wayfinding signs, benches & trash bins To: Mayor and City Council
From: City Manager
Meeting Date: June 9, 2026
Subject: ROSEMEAD BOULEVARD MEDIAN AND PARKWAY
BEAUTIFICATION PROJECT, CIP NO. 50076, CCL-5351(042) –
NOTICE OF COMPLETION
Recommendation:
1. Accept the work as completed for the Rosemead Boulevard Median and Parkway Beautification Project, CIP No. 50076, CCL-5351(042) constructed by Urban Habitat and authorize the City Clerk to file the Notice of Completion with the Los Angeles County Registrar-Recorder; and
2. Authorize the City Manager to release the retention and all other monies due to Urban Habitat, following the mandatory waiting period from the date the Notice of Completion is recorded.
Strategic Priority:
3 - Infrastructure - Plan, fund, build, and maintain reliable and cost-effective infrastructure that contributes to enhancing quality of life.
Strategy:
3.3 Complete construction of necessary infrastructure projects to implement master plans in a timely manner.
Fiscal Impact:
This project has total budget of $5,746,557, as detailed in the table on next page. The total estimated project expenditure is approximately $5,100,000. The remaining balance will be unencumbered and returned to the respective funding sources for future capital projects. No additional appropriation is necessary at this time 14 Back to Agenda Outline
CITY COUNCIL AGENDA REPORT – MEETING OF JUNE 9, 2026
ROSEMEAD BOULEVARD MEDIAN AND PARKWAY BEAUTIFICATION PROJECT, CIP NO. 50076, CCL-5351(042) – NOTICE OF COMPLETION
Discussion:
In 2022, the City of Pico Rivera was successful in securing grant funding for two (2) projects under the Clean California Local Grant Program, Cycle 1: the Pico Rivera Major Corridors Median and Parkway Beautification Project and the Rosemead Boulevard Median and Parkway Beautification Project. This report pertains solely to the completion of the Rosemead Boulevard Median and Parkway Beautification Project, CIP No. 50076.
A separate agenda report will be presented to address the completion of the Major Corridors Median and Parkway Beautification Project.
The Rosemead Boulevard Median and Parkway Beautification Project, CIP No. 50076, was designed in 2022, publicly advertised and competitively bid in 2023, and construction commenced in late 2023. Construction activities reached completion in December 2025.
The project was delivered within the approved budget, with a total estimated construction cost of $5,100,000. This amount includes approved change orders necessary to address unforeseen field conditions, including but not limited to additional AC removals, soil amendments, tree removals, installation of new trees, and removal and disposal of unsuitable soils. Due to unforeseen issues affecting several planted trees along Rosemead Boulevard, additional tree remediation work is currently underway, along with the remediation of monument lighting fixtures.
A summary of the total project budget and estimated expenditures is provided below:
Budget Funding Source Total
Clean California Grant (Fund 699) $3,916,167
Capital Improvement Fund (Fund 400) $455,390
Proposition A (Fund 205) $155,000
Proposition C (Fund 206) $1,020,000
Measure W (Fund 209) $200,000
Total Funding: $5,746,557
Project Activity Amount
Design $ 255,500
Construction $ 4,025,400
Change Orders $ 258,100
Construction Management and Inspection $ 465,000
Project Administration $ 96,000
Total Estimated Project Cost $ 5,100,000
CITY COUNCIL AGENDA REPORT – MEETING OF JUNE 9, 2026
ROSEMEAD BOULEVARD MEDIAN AND PARKWAY BEAUTIFICATION PROJECT, CIP NO. 50076, CCL-5351(042) – NOTICE OF COMPLETION
The total estimated project cost is considered substantially complete; however, some additional expenditures are anticipated as staff finalize the remaining administrative and closeout activities associated with project.
Conclusion:
Staff recommend accepting the project as complete, authorizing the filing of a Notice of Completion with the Los Angeles County Registrar-Recorder’s Office and releasing the retention payment to Urban Habitat following the statutory waiting period, provided no claims are filed within 35 days after recordation.
Steve Carmona
SC:NN:NC:np
Enclosure: 1) Notice of Completion
RECORDING REQUESTED BY
NAME: ____________________________________________________ WHEN RECORDED MAIL TO:
NAME: _________________________________________________ ADDRESS: _________________________________________________ CITY / STATE / ZIP: ____________________________________________ (DOCUMENT WILL ONLY BE RETURNED TO NAME & ADDRESS IDENTIFIED ABOVE) (SPACE ABOVE FOR RECORDER’S USE)
____________________________________________________________________________________ (DOCUMENT TITLE)
SEPARATE PAGE, PURSUANT TO CA. GOV’T. CODE 27361.6
Genevie Martinez
City of Pico Rivera
6615 Passons Blvd.
Pico Rivera, CA 90660
Notice of Completion
14a
Enclosure 1
2. The full name of the owner is
3. The full address of the owner is
4. The nature of the interest or estate of the owner is: in fee.
NAMES ADDRESSES
NAMES ADDRESSES
7. A work of improvement on the property hereinafter described was completed on The work done was:
8. The names of the contractor, if any, for such work of improvements was
9. The property on which said work of improvement was completed is in the City of County of , State of , and is described as follows:
10. The street address of said property is:
City of Pico Rivera
Dated:
City Manager,
(Personal signature of the individual who is swearing that the contents of the Notice of Completion are true) I, the undersigned, say: I am the ___________________________, the Declarant of the foregoing Notice of Completion; I have (President of, Manager of, Partner of, Owner of, Etc.)
read said Notice of Completion and know the contents thereof; the same is true to my own knowledge. I declare under penalty of perjury that the foregoing is true and correct.
Executed on ___________________________, 20___ at ________________________________, __________.
6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements therein reffered to:
(If no street address has been officially assigned, insert "none".) (Signature of Owner or coporate officer of Owner named in paragraph 2, or his agent)
VERIFICATION
NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. (See reverse side for complete requirements.) Notice is hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described. (If other than Fee, strike "in fee" and insert, for example, "purchaser under contract of purchase," or "lessee")
5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are:
City of Pico Rivera
6615 Passons Boulevard, Pico Rivera, California 90660
6615 Passons Boulevard, Pico Rivera, California 90660
Los Angeles
Pico Rivera
CA
City Clerk
Steve Carmona
23 Urban Habitat
December 2025
Improvements include new trees,
shrubs, cobblestone, mulch, irrigation system, art elements, entrance monuments, solar lighting, wayfinding signs, benches & trash bins Beautification of median islands along Rosemead Blvd.
Rosemead Boulevard Median and Parkway Beautification Project, CIP No. 50075, CCL-5351(042)
COUNCIL
MEETING
DATE
COUNCIL MEMBER REQUEST DETAIL DIRECTOR(S)
ACTION TAKEN: Memo; Staff
Report; Closed Session;
Presentation; Follow-up
Meeting; City Manager Reports;
Informal Action
DISCUSSION
ITEM
ACTION
ITEM DATE
STATUS:
Complete;
Pending;
On-going;
In-Progress