City of Piedmont
COUNCIL AGENDA REPORT
DATE: December 2, 2024
TO: Mayor and Council
FROM: Rosanna Bayon Moore, City Administrator
SUBJECT: Consideration of a Resolution to Approve the Project and Adopt an Initial Study and Negative Declaration and a Mitigation Monitoring and Reporting Plan for the Sanitary Sewer Rehabilitation Project – Phase 6
RECOMMENDATION:
Approve the attached Resolution Adopting an Initial Study and Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program in Accordance with the California Environmental Quality Act.
BACKGROUND AND DISCUSSION:
An Initial Study/Mitigated Negative Declaration (IS/MND) and Mitigation Monitoring and Reporting Plan (MMRP) are required as a part of the Clean Water State Revolving Fund (CWSRF) loan application process to obtain a low interest State loan for the Phase 6 Sewer Rehabilitation Project.
The IS-MND concluded that the project would have less-than-significant impacts in the various topic areas required by CEQA Guidelines Appendix G including Aesthetics, Biological Resources, Energy, Geology, Greenhouse Gas Emissions, Hazardous Materials, Water Quality, Land Use, Mineral Resources, Housing, Public Services, Recreation, Utilities, and Wildfire. Air Quality, Noise, Traffic, and Cultural Resources impacts were identified as potentially significant, however, it was determined that the implementation of feasible mitigation measures would reduce these impacts to less than significant levels. A Mitigation Monitoring and Reporting Program (MMRP) was prepared and is attached to this report. The City of Piedmont has determined that an Initial Study/Mitigated Negative Declaration is the appropriate CEQA document.
The draft IS-MND was posted on October 22, 2024 for public review. The City submitted a Notice of Intent to the State Clearinghouse and the Alameda County Clerk-Recorder’s Office on October 22, 2024. The public comment period for the IS-MND and MMRP opened on October 25, 2024, and closed on November 25, 2025. The City received no comments on the draft IS-MND.
The IS-MND is provided through hyperlink: https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_13659739/File/Piedmont_Sewer%20Reha b_%20IS-MND_Draft_10_25_24.pdf?v=zSXQZCNjw&v=zSXQZCNjw
FISCAL IMPACT
There are no additional financial considerations for this item. All required mitigation will be implemented during construction and will be eligible to be funded via the CWSRF loan when approved.
CITY ATTORNEY REVIEW
The City Attorney has reviewed the Staff Report and Resolution.
ATTACHMENTS
1. Resolution
2. MMRP
By: Daniel Gonzales, Director of Public Works
Agenda Report Page 2
Resolution ______
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PIEDMONT ADOPTING
AN INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION AND
MITIGATION MONITORING AND REPORTING PLAN FOR THE SANITARY SEWER REHABILITATION PROJECT – PHASE 6 IN ACCORDANCE WITH THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT
WHEREAS, the City, acting as the Lead Agency as defined in Public Resources Code (PRC) §21067, prepared an Initial Study for the Project pursuant to the California Environmental Quality Act (“CEQA”) to ascertain whether the Sanity Sewer Rehabilitation Project – Phase 6 (the “Project”) may have a significant effect on the environment; and
WHEREAS, the City determined that a Mitigated Negative Declaration was the appropriate and proper environmental analysis, given that the incorporation of specified mitigation measures would result in the project having no significant effect on the environment; and
WHEREAS, the City shall incorporate into the Project all applicable mitigation measures identified in the IS/MND and MMRP; and
WHEREAS, an Initial Study-Mitigated Negative Declaration (IS-MND) was prepared and filed with the State Clearinghouse on October 22, 2024; and was circulated for public comment for 30 days; and
WHEREAS, the City received no comments on the draft IS-MND; and WHEREAS, the IS-MND identified certain potentially significant adverse environmental impacts from the Project and recommends certain mitigation measures regarding such effects; and
WHEREAS, the City considered the IS/MND and MMRP on December 2, 2024; and WHEREAS, the statements, findings, determinations, certifications, approvals and other actions set forth in this Resolution are based on the entire record before the City, including, without limitation, (i) the IS/MND and MMRP, both of which are on file at City Hall, 120 Vista Avenue, Piedmont, California and can be downloaded from the City’s website at:
https://piedmont.ca.gov/services___departments/public_works/city_projects; (ii) the staff report (including attachments thereto) accompanying this Resolution; and (iii) all written and oral testimony presented to the City.
NOW THEREFORE BE IT RESOLVED that the City Council of the City of Piedmont does hereby declare, determine, and order as follows:
Attachment 1 Agenda Report Page 3
SECTION 1. The City of Piedmont, on the basis of the whole record before it, and based on its independent judgment and analysis, hereby finds there is no substantial evidence that the Project will have a significant effect upon the environment.
SECTION 2. The City hereby approves and adopts the IS/MND for the Project based upon the findings specified in Section 1 above, and subject to the mitigation measures contained therein and in the MMRP.
SECTION 3. The City approves and adopts the MMRP for the Project, which is incorporated herein by reference, and directs staff to carry out the Project to implement and comply with: 1) the mitigation measures, which are described and referenced in the IS/MND; and 2) the MMRP.
SECTION 4. The City is the custodian of the documents and other material which constitute the record of proceedings upon which the decision to approve the IS/MND and MMRP is based. Documents and other materials are located in the City offices at 120 Vista Avenue, Piedmont, California.
SECTION 5. Once the Project is approved, the City Administrator is hereby authorized to file a Notice of Determination with respect to the IS/MND with the Alameda County Clerk and the State of California Office of Planning and Research.
Passed, approved and adopted at a regular meeting of the City Council this 2 nd day of
December 2024 by the following vote:
Ayes:
Noes:
Abstain:
Attest:
_________________________
Anna Brown
City Clerk
Attachment 1 Agenda Report Page 4
CITY OF PIEDMONT – Sanitary Sewer Rehabilitation Phase 6 Project
FINAL
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
AND
RESPONSES TO COMMENTS
State Clearinghouse Number
2024101230
December 2024
Lead Agency:
City of Piedmont
120 Vista Avenue
Piedmont, CA 94611
Prepared by:
2525 Warren Drive
Rocklin, California 95677
Attachment 2 Agenda Report Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 6
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Notice of Determination 1 December 2024
NOTICE OF DETERMINATION
TO: FROM:
Office of Planning and Research
1400 10th Street
Sacramento, CA 95814
City of Piedmont
120 Vista Avenue
Piedmont, California 94611
SUBJECT: Filing of Notice of Determination in compliance with Section 21108 of the Public Resources Code
PROJECT TITLE: City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project State Clearinghouse Number Contact Person Telephone Number 2024101230 Daniel Gonzales 510-420-3061
Project Approval
The City of Piedmont adopted the Initial Study/Mitigated Negative Declaration and approved the City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project on December 2, 2024.
Project Location
The Project Area collectively consists of approximately 4.08 acres of discontinuous property located in the unsectioned San Antonio (V. and D. Peralta) Land Grant as depicted on the 1997 “Oakland East, California” U.S. Geological Survey (USGS) 7.5-minute topographic quadrangle map. The Project Area is located in discontinuous sections throughout the City of Piedmont, primarily within City Right of Way (ROW). The Project Area is west of State Route (SR) 13, north of Interstate (I) 580, south of Moraga Avenue, and east of Broadway.
Summary Project Description
The Project proposes to rehabilitate 17,626 feet of existing sanitary sewer collection pipe utilizing the pipe bursting method (between 6 and 15-inch diameter pipes). The existing pipelines are located within existing paved roads and the front and backyard property lines of private properties in the City of Piedmont in Alameda County, California. The Project is phase 6 of the City’s ongoing Sanitary Sewer Rehabilitation Projects.
The State, as the Lead Agency, has approved the above-described Project and has made the following determinations:
There is no substantial evidence that the Proposed Project will have a significant effect on the environment;
In accordance with the California Environmental Quality Act (CEQA), a Mitigated Negative Declaration for the Proposed Project was prepared. The Mitigated Negative Declaration has been adopted by City of Attachment 2 Agenda Report Page 7
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Notice of Determination 2 December 2024
Piedmont which is the Lead Agency for the Proposed Project. The Mitigated Negative Declaration and record of project approval may be examined at the following website:
https://piedmont.ca.gov/services___departments/public_works/city_projects Mitigation measures were required to be made a condition of approval of the Proposed Project; A Statement of Overriding Considerations was not required to be adopted for the Proposed Project; and A Mitigation Monitoring and Reporting Plan was adopted for the Proposed Project.
This is to certify that the Final Initial Study/Mitigated Negative Declaration including comments and responses, the mitigation monitoring and reporting plan, and record of Project approval is available to the general public at:
https://piedmont.ca.gov/services___departments/public_works/city_projects Daniel Gonzales, Director of Public Works
City of Piedmont
Date
Date Received for Filing at OPR: __December 4, 2024__________ Attachment 2 Agenda Report Page 8
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 FINAL
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
AND
RESPONSES TO COMMENTS
State Clearinghouse Number
2024101230
December 2024
Attachment 2 Agenda Report Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 10
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Final Mitigated Negative Declaration i Decemebr 2024
CONTENTS
Final Initial Study/Mitigated Negative Declaration – City of Piedmont Mitigation Measures Incorporated into the Project to Avoid Significant Effects ........................................ i SECTION 1. Introduction ............................................................................................................................................................... 1-1 SECTION 2. Project Overview ...................................................................................................................................................... 2-1
2.1 Project Location ....................................................................................................................................................... 2-1
2.2 Project Description .................................................................................................................................................. 2-1 SECTION 3. Comments and Responses…………………………………………………………………………………… ..................... 3-1 SECTION 4. Revisions to the Draft Initial Study/ Mitigated Negative Declaration ................................................ 4-1 SECTION 5. Mitigation Monitoring and Reporting Plan .................................................................................................. 5-1 SECTION 6. List of Appendix ....................................................................................................................................................... 6-1 Appendix A – Notice of Intent
Appendix B – Proof of Publication
Appendix C – CDFW Filing Fee Receipt
Appendix D – Draft Initial Study and Mitigated Negative Declaration
LIST OF ACRONYMS AND ABBREVIATIONS
Term Definition
CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
IS Initial Study
MMRP Mitigation Monitoring and Reporting Program
MND Mitigated Negative Declaration
NAHC Native American Heritage Commission
NHPA National Historic Preservation Act
OPR Office and Planning and Research
Attachment 2 Agenda Report Page 11
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Final Mitigated Negative Declaration i December 2024
FINAL MITIGATED NEGATIVE DECLARATION
CITY OF PIEDMONT SANITARY REHABILITATION PHASE 6 PROJECT Summary
Lead Agency: City of Piedmont
Project Location:
The Project Area collectively consists of approximately 4.08 acres of discontinuous property located in the unsectioned San Antonio (V. and D. Peralta) Land Grant as depicted on the 1997 “Oakland East, California” U.S. Geological Survey (USGS) 7.5-minute topographic quadrangle map. The Project Area is located in discontinuous sections throughout the City of Piedmont, primarily within City Right of Way (ROW). The Project Area is west of State Route (SR) 13, north of Interstate (I) 580, south of Moraga Avenue, and east of Broadway.
Summary Project Description:
The Project proposes to rehabilitate 17,626 feet of existing sanitary sewer collection pipe utilizing the pipe bursting method (between 6 and 15-inch diameter pipes). The existing pipelines are located within existing paved roads and the front and backyard property lines of private properties in the City of Piedmont in Alameda County, California. The Project is phase 6 of the City’s ongoing Sanitary Sewer Rehabilitation Project.
Finding:
Based on the information contained in the attached Initial Study, the City finds that there would not be a significant effect on the environment because the mitigation measures described herein would be incorporated as part of the Proposed Project.
Mitigation Measures Incorporated into the Project to Avoid Significant Effects Air Quality
AQ-1: Adhere to Bay Area Air Quality Management District Basic Construction Best Management Practices.
All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. All haul trucks transporting soil, sand, or other loose material off-site shall be covered.
All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.
All vehicle speeds on unpaved roads shall be limited to 15 mph.
Attachment 2 Agenda Report Page 12
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Final Mitigated Negative Declaration ii December 2024
All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.
All trucks and equipment, including their tires, shall be washed off prior to leaving the site.
Unpaved roads providing access to sites located 100 feet or further from a paved road shall be treated with a 6- to 12-inch layer of compacted layer of wood chips, mulch, or gravel.
Publicly visible signs shall be posted with the telephone number and name of the person to contact at the lead agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s General Air Pollution Complaints number shall also be visible to ensure compliance with applicable regulations.
Cultural Resources
CUL-1: Archaeological (Spot Checking). In Project areas with moderate to low archaeological sensitivity, a program of intermittent monitoring (spot-checking) of insertion pit excavation shall be developed and implemented by a qualified archaeologist.
In the event that presently unanticipated prehistoric and/or historic period cultural resources of significance are encountered within excavation activities, all activity in the area of discovery shall cease until the City retains the services of a qualified archaeological consultant who shall examine the findings, assess their significance, and offer proposals for any procedures deemed appropriate to further investigate and/or mitigate adverse impacts to those cultural resources that have been encountered.
CUL-2 Unanticipated Discoveries. There always remains the potential for ground-disturbing activities to expose previously unrecorded cultural resources. Both CEQA and Section 106 of the NHPA require the lead agency to address any unanticipated cultural resource discoveries during Project construction. Therefore, the following procedures shall be implemented:
If subsurface deposits believed to be cultural or human in origin are discovered during construction, all work must halt within a 100-foot radius of the discovery. A qualified professional archaeologist, meeting the Secretary of the Interior’s Professional Qualification Standards for prehistoric and historic archaeology, shall be retained to evaluate the significance of the find, and shall have the authority to modify the no-work radius as appropriate, using professional judgment. The following notifications shall apply, depending on the nature of the find:
If the professional archaeologist determines that the find does not represent a cultural resource, work may resume immediately and no agency notifications are required.
Attachment 2 Agenda Report Page 13
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Final Mitigated Negative Declaration iii December 2024
If the professional archaeologist determines that the find does represent a cultural resource from any time period or cultural affiliation, the archaeologist shall immediately notify the lead agencies. The agencies shall consult on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined by CEQA or a historic property under Section 106 NHPA, if applicable. Work may not resume within the no-work radius until the lead agencies, through consultation as appropriate, determine that the site either: 1) is not a Historical Resource under CEQA or a Historic Property under Section 106; or 2) that the treatment measures have been completed to their satisfaction.
If the find represents a Native American or potentially Native American resource that does not include human remains, then he or she shall further notify [tribe]. The agencies shall consult with the tribes on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines. Preservation in place is the preferred treatment, if feasible. Work may not resume within the nowork radius until the lead agencies, through consultation as appropriate, determine that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) that the treatment measures have been completed to their satisfaction.
If the find includes human remains, or remains that are potentially human, they shall ensure reasonable protection measures are taken to protect the discovery from disturbance (AB 2641). The archaeologist shall notify the Alameda County Coroner (per Section 7050.5 of the Health and Safety Code). The provisions of Section 7050.5 of the California Health and Safety Code, Section 5097.98 of the California PRC, and AB 2641 will be implemented. If the coroner determines the remains are Native American and not the result of a crime scene, the coroner will notify the NAHC, which then will designate a Native American Most Likely Descendant (MLD) for the Project (Section 5097.98 of the PRC). The designated MLD will have 48 hours from the time access to the property is granted to make recommendations concerning treatment of the remains. If the landowner does not agree with the recommendations of the MLD, the NAHC can mediate (Section 5097.94 of the PRC).
If no agreement is reached, the landowner must rebury the remains where they will not be further disturbed (Section 5097.98 of the PRC). This will also include either recording the site with the NAHC or the appropriate Information Center; using an open space or conservation zoning designation or easement; or recording a reinternment document with the county in which the property is located (AB 2641).
Work may not resume within the no-work radius until the lead agencies, through consultation as appropriate, determine that the treatment measures have been completed to their satisfaction
Attachment 2 Agenda Report Page 14
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Final Mitigated Negative Declaration iv December 2024
Paleontological Resources
GEO-1: Unanticipated Discovery of Paleontological Resources. If any paleontological resources (i.e., fossils) are found during Project construction, construction shall be halted immediately in the subject area and the area shall be isolated using orange or yellow fencing until the City is notified and the area is cleared for future work. A qualified paleontologist shall be retained to evaluate the find and recommend appropriate treatment of the inadvertently discovered paleontological resources. If the City resumes work in a location where paleontological remains have been discovered and cleared, the City will have a paleontologist onsite to confirm that no additional paleontological resources are in the area.
Noise
NOI-1: Noise Mitigation. The Project improvement and construction plans will include the following requirements for construction activities:
Construction contacts must specify that all construction equipment, fixed or mobile, shall be equipped with properly operating and maintained mufflers and other staterequired noise attenuation devices. A sign, legible at a distance of 50 feet, shall be posted at the Project construction sites providing a contact name and a telephone number where residents can inquire about the construction process and register complaints. This sign shall indicate the dates and duration of construction activities. In conjunction with this required posting, a noise disturbance coordinator will be identified to address construction noise concerns received. The coordinator shall be responsible for responding to any local complaints about construction noise. When a complaint is received, the disturbance coordinator shall notify the City within 24 hours of the complaint and determine the cause of the noise complaint (starting too early, malfunctioning muffler, etc.) and shall implement reasonable measures to resolve the complaint, as deemed acceptable by the City. All signs posted at the construction site shall include the contact name and the telephone number for the noise disturbance coordinator. Identification of construction noise reduction methods. These reduction methods may include shutting off idling equipment (5 minutes), installing temporary acoustic barriers around stationary construction noise sources, maximizing the distance between construction equipment staging areas and occupied residential areas, and using electric air compressors and similar power tools. During construction, stationary construction equipment shall be placed such that emitted noise is directed away from sensitive noise receivers. Per Piedmont City Code Section 12.8, Noise Declared Nuisance, construction and demolition shall be prohibited between the hours of 6:00 p.m. and 8:00 a.m. Sunday evening through Saturday morning and between 6:00 p.m. and 9:00 a.m. Saturday evening through Sunday morning.
Attachment 2 Agenda Report Page 15
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Final Mitigated Negative Declaration v December 2024
NOI-2: Temporary Noise Barriers. In order to reduce construction noise, during the excavation and paving phases, all other portable stationary noise sources (e.g., excavators, compactors, generators, compressors, etc.) will be screened from sensitive receptors in a manner that breaks the line of sight between the construction equipment and these residences.
Temporary noise barriers/enclosures shall have a sound transmission class (STC) of 10 or greater in accordance with American Society for Testing and Materials Test Method E90, or at least 2 pounds per square foot to ensure adequate transmission loss characteristics. The temporary noise barrier can consist of a solid plywood fence at least 7/16-inch in thickness and/or flexible sound curtains, such as an 18-ounce tarp or a 2-inch-thick fiberglass blanket, attached to chain link fencing. The length, height, and location of the temporary noise barrier shall be adequate to assure proper acoustical performance. Specifically, the barrier must completely break the line of sight between the construction site and adjacent residences along the linear Project Site, must be free of degrading holes or gaps and must not be flanked by nearby reflective surfaces. All noise control barrier walls/enclosures shall be designed to preclude structural failure due to such factors as winds, shear, shallow soil failure, earthquakes, and erosion.
Transportation
TRANS-1: Construction Traffic Management Plan. Prior to commencing construction of the Proposed Project, a construction traffic management plan (Traffic Plan) shall be prepared by the Contractor, in coordination with the City. The management plan shall be detailed and comprehensive to adequately mitigate potential conflicts between baseline and construction-related traffic. The Traffic Plan will include, at a minimum, the following measures:
A. Adequate off-street worker parking shall be provided along the pipeline route.
B. A flagman or signal-controlled one-way traffic-control operation shall be provided where two-way traffic operation is impractical or unsafe.
C. Roadway disturbances shall be minimized during non-working hours; open trenches shall be covered with steel plates or by the use of temporary backfill during non-working hours.
D. Temporary steel plate trench crossings shall be provided as needed to maintain access to homes, farms, and businesses.
E. Construction sites shall be posted with appropriate warning signage at least one week prior to construction to allow local residents to select an alternative travel route.
F. Construction staging areas shall be provided to minimize storage of equipment and materials in the traffic lanes.
Attachment 2 Agenda Report Page 16
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Final Mitigated Negative Declaration vi December 2024
G. All paved surfaces disturbed during construction shall be repaved when work is complete.
H. The Contractor shall provide traffic control and diversion plans for review and approval by each appropriate jurisdiction.
I. To minimize delays in emergency response during project construction, emergency providers shall be notified in advance. Police, fire protection, and ambulance services shall be notified in advance of the times, duration, and location of construction activities throughout the project’s construction process.
Attachment 2 Agenda Report Page 17
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Final Mitigated Negative Declaration vii December 2024
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 18
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Introduction 1-1 December 2023
1.0 INTRODUCTION
This document is the Final Initial Study and Mitigated Negative Declaration (Final IS/MND) including the Responses to Comments and the Mitigation Monitoring and Reporting Plan for the City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project. It has been prepared in accordance with the California Environmental Quality Act (CEQA) (Public Resource Code Section 21000 et. seq.) and the State CEQA Guidelines (California Code of Regulations Section 15000 et seq.) as amended. This Final IS/MND and Responses to Comments document supplements and updates the Draft Initial Study/Mitigated Negative Declaration (Draft IS/MND) released for public review on October 29, 2024.
The City of Piedmont is the Lead Agency for the Proposed Project. On October 29, 2024, the City of Piedmont distributed the Draft IS/MND for the proposed Project to public agencies and the general public for review and comment. In accordance with the State CEQA Guidelines, a 30-day review period, which ended on November 27, 2024, was completed. During the public review period no comments were received.
This Final IS/MND is organized as follows:
Section 1.0 provides a discussion of the purpose of the document and discusses the structure of the document;
Section 2.0 contains a summary of the Project Description, and a discussion of why recirculation of the Draft IS/MND is not required;
Section 3.0 includes the comment letter received and responses to these comments; Section 4.0 includes corrections and revisions made to the Draft IS/MND in response to comments; Section 5.0 includes the Proposed Project’s Mitigation Monitoring and Reporting Program (MMRP), prepared pursuant to Public Resources Code Section 21081.6; and Section 6.0 includes the Notice of Intent, Proof of Publication, Environmental Filing Receipt, and the Draft IS/MND.
This Final MND document and the Draft IS/MND together constitute the environmental document for the proposed Project. As a result of comments received on the Draft IS/MND, minor revisions were required to the Draft IS/MND text, however, there were no substantial revisions that would require recirculation of the document. A substantial revision according to Section 15073.5 of the 2021 CEQA Statute Guidelines shall mean:
“(1) A new, avoidable significant effect is identified and mitigation measures or project revisions must be added in order to reduce the effect to insignificance, or (2) The lead agency determines that the proposed mitigation measures or project revisions will not reduce potential effects to less than significance and new measures or revisions must be required.”
Attachment 2 Agenda Report Page 19
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Introduction 1-2 December 2023
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 20
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Project Overview 2-1 December 2023
2.0 PROJECT OVERVIEW
2.1 Project Location
The Project site is located on the eastern side of Venture Parkway in the northern portion of Lot 11 (Lot 11A) within the Stillwater Business Park in the City of Redding. The site is designated APN 054-220-032 in Shasta County. The Project Site corresponds to a portion of Section 23, Township 31 North, and Range 04 West (Mount Diablo Base and Meridian) of the “Enterprise, California” 7.5-minute quadrangle. The approximate center of the Project Site is located at latitude 40.523666° and longitude -122.280451°. The Project Site corresponds with County Assessor’s Parcel number 054-220-032-000.
2.2 Project Description Summary
The Project proposes to rehabilitate 17,626 feet of existing sanitary sewer collection pipe utilizing the pipe bursting method (between 6 and 15-inch diameter pipes). The existing pipelines are located within existing paved roads and the front and backyard property lines of private properties in the City of Piedmont in Alameda County, California. The Project is phase 6 of the City’s ongoing Sanitary Sewer Rehabilitation Projects.
2.3 Decision Not to Recirculate Draft MND
According to Section 15073.5 of the State CEQA Guidelines, “A lead agency is required to recirculate a negative declaration when the document must be substantially revised after public notice of its availability has been given pursuant to Section 15072 but prior to its adoption.” Because no revisions were proposed, this Final MND does not meet the criteria for recirculation provided in Section 15073.5 (c) of the CEQA Guidelines. These criteria are provided below, along with an explanation regarding the reasons why the changes to the Project do not require recirculation.
Recirculation is not required under the following circumstances:
(1) Mitigation measures are replaced with equal or more effective measures pursuant to Section 15074.1.
a. No mitigation measures have been replaced.
(2) New Project revisions are added in response to written or verbal comments on the Project’s effects identified in the proposed negative declaration which are not new avoidable significant effects.
a. No revisions to the Project as described in the Draft IS/MND have been made. (3) Measures or conditions of Project approval are added after circulation of the negative declaration, which is not required by CEQA, which do not create new significant environmental effects, and are not necessary to mitigate an avoidable significant effect.
Attachment 2 Agenda Report Page 21
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Project Overview 2-2 December 2023
a. As discussed, two new mitigation measures were added. However, the project findings with incorporation of the new mitigation is less than significant. (4) New information is added to the negative declaration which merely clarifies, amplifies, or makes insignificant modifications to the negative declaration. a. No new information has been added to the MND.
Attachment 2 Agenda Report Page 22
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Comments and Responses 3-1 December 2023
3.0 COMMENTS AND RESPONSES
The 30-day public review period began on October 29, 2024 and ended on November 27, 2024. During this time, no comments were received on the proposed project.
Attachment 2 Agenda Report Page 23
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Comments and Responses 3-2 December 2023
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 24
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Revisions to the Draft IS/MND 4-1 December 2023
4.0 REVISIONS TO THE DRAFT INITIAL STUDY/MITIGATED NEGATIVE
DECLARATION
During the 30-day public review period, October 29, through November 27, 2024, no comments were received. As a result, no revisions to the document were necessary and recirculation of the document is not necessary.
Attachment 2 Agenda Report Page 25
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Revisions to the Draft IS/MND 4-2 December 2023
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 26
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-1 December 2023
5.0 MITIGATION MONITORING AND REPORTING PLAN
5.1 Introduction
In accordance with CEQA, an MND that identifies adverse impacts related to construction and operation of the Project was prepared. The MND identifies mitigation measures that would reduce or eliminate these impacts.
Section 21081.6 of the Public Resources Code and Sections 15091(d) and 15097 of the State CEQA Guidelines require public agencies to adopt a reporting and monitoring program for changes to the project which it has adopted or made a condition of project approval in order to mitigate or avoid significant effects on the environment. An MMRP is required for the proposed Project because the IS/MND identified potentially significant adverse impacts related to construction and operation of the proposed Project, and mitigation measures have been identified to mitigate these impacts. Adoption of the MMRP will occur along with approval of the proposed Project.
5.2 Purpose of the Mitigation Monitoring and Reporting Plan This MMRP has been prepared to ensure that all required mitigation measures are implemented and completed according to schedule and maintained in a satisfactory manner during the construction and operation of the Proposed Project, as required. The MMRP may be modified by the City of Piedmont during Project implementation, as necessary, in response to changing conditions or other Project refinements. Table 5-1 has been prepared to assist the responsible parties in implementing the MMRP.
This table identifies the category of significant environmental impact(s), individual mitigation measures, monitoring and mitigation timing, responsible person/agency for implementing the measure, monitoring, and reporting procedure, and notation space to confirm implementation of the mitigation measures. The numbering of the mitigation measures follows the numbering sequence in the IS/MND.
5.3 Roles and Responsibilities
The City of Piedmont is responsible for oversight of compliance of the mitigation measures in the MMRP.
5.4 Mitigation Monitoring and Reporting Plan
The column categories identified in Table 5-1 are described below.
Mitigation Measure – This column lists the mitigation measures by number.
Monitoring Activity/Timing/Frequency/Schedule – This column lists the activity to be monitored for each mitigation measure, the timing of each activity, and the frequency/schedule of monitoring for each activity.
Implementation Responsibility/Verification – This column identifies the entity responsible for complying with the requirements of the mitigation measure and provides space for verification initials and date.
Attachment 2 Agenda Report Page 27
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-2 December 2023 Responsibility for Oversight of Compliance/Verification – This column provides the agency responsible for oversight of the mitigation implementation and is to be dated and initialed by the agency representative based on the documentation provided by the construction contractor or through personal verification by agency staff.
Outside Agency Coordination – This column lists any agencies with which CAL FIRE and/or DGS may coordinate for implementation of the mitigation measure.
Comments – This column provides space for written comments, if necessary.
Attachment 2 Agenda Report Page 28
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-3 December 2024 Table 5-1.
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
Air Quality
AQ-1: Adhere to Bay Area Air Quality Management
District Basic Construction Best Management
Practices. The Project shall implement the following
Bay Area Air Quality Management Construction Best
Management Practices:
All exposed surfaces (e.g., parking areas, staging
areas, soil piles, graded areas, and unpaved
access roads) shall be watered two times per day.
All haul trucks transporting soil, sand, or other
loose material off-site shall be covered.
All visible mud or dirt track-out onto adjacent
public roads shall be removed using wet power
vacuum street sweepers at least once per day.
The use of dry power sweeping is prohibited.
All vehicle speeds on unpaved roads shall be
limited to 15 mph.
All roadways, driveways, and sidewalks to be
paved shall be completed as soon as possible.
Building pads shall be laid as soon as possible
Action:
Adhere to the Bay Area Air
Quality Management
District Construction Best
Management Practices.
Timing:
During Construction.
Construction
Manager
Initials
Date
Construction
Manager / City of
Piedmont
Initials
Date
Attachment 2 Agenda Report Page 29
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-4 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
after grading unless seeding or soil binders are
used.
All trucks and equipment, including their tires,
shall be washed off prior to leaving the site.
Unpaved roads providing access to sites located
100 feet or further from a paved road shall be
treated with a 6- to 12-inch layer of compacted
layer of wood chips, mulch, or gravel.
Publicly visible signs shall be posted with the
telephone number and name of the person to
contact at the lead agency regarding dust
complaints. This person shall respond and take
corrective action within 48 hours. The Air
District’s General Air Pollution Complaints
number shall also be visible to ensure compliance
with applicable regulations.
Cultural Resources
CUL-1: Archaeological (Spot Checking). In Project
areas with moderate to low archaeological sensitivity,
a program of intermittent monitoring (spot-checking)
of insertion pit excavation shall be developed and
implemented by a qualified archaeologist.
Action:
Spot Checking.
Timing:
Ongoing and as needed
during construction
activities.
Construction
Manager/Qualifie
d professional
archaeologist if
resources are
found
Construction
Manager / City of
Piedmont
Attachment 2 Agenda Report Page 30
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-5 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
In the event that presently unanticipated prehistoric
and/or historic period cultural resources of
significance are encountered within excavation
activities, all activity in the area of discovery shall cease until the City retains the services of a qualified
archaeological consultant who shall examine the
findings, assess their significance, and offer proposals for any procedures deemed appropriate to further
investigate and/or mitigate adverse impacts to those
cultural resources that have been encountered.
Initials
Date
Initials
Date
CUL-2 Unanticipated Discoveries. There always
remains the potential for ground-disturbing activities
to expose previously unrecorded cultural resources.
Both CEQA and Section 106 of the NHPA require the
lead agency to address any unanticipated cultural
resource discoveries during Project construction.
Therefore, the following procedures shall be
implemented:
If subsurface deposits believed to be cultural or
human in origin are discovered during
construction, all work must halt within a 100-foot
radius of the discovery. A qualified professional
Action:
Implement unanticipated
human remains protocol.
Timing:
Ongoing and as needed
during construction
activities.
Construction
Manager/Qualifie
d Professional
Archeologist.
Initials
Date
City of Piedmont
Initials
Date
Attachment 2 Agenda Report Page 31
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-6 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
archaeologist, meeting the Secretary of the
Interior’s Professional Qualification Standards for
prehistoric and historic archaeology, shall be
retained to evaluate the significance of the find,
and shall have the authority to modify the no-work
radius as appropriate, using professional judgment.
The following notifications shall apply, depending
on the nature of the find:
If the professional archaeologist determines that
the find does not represent a cultural resource,
work may resume immediately and no agency
notifications are required.
If the professional archaeologist determines that
the find does represent a cultural resource from
any time period or cultural affiliation, the
archaeologist shall immediately notify the lead
agencies. The agencies shall consult on a finding of
eligibility and implement appropriate treatment
measures, if the find is determined to be a
Historical Resource under CEQA, as defined by
CEQA or a historic property under Section 106
NHPA, if applicable. Work may not resume within
the no-work radius until the lead agencies, through
consultation as appropriate, determine that the site
either: 1) is not a Historical Resource under CEQA
Attachment 2 Agenda Report Page 32
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-7 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
or a Historic Property under Section 106; or 2) that
the treatment measures have been completed to
their satisfaction.
If the find represents a Native American or
potentially Native American resource that does not
include human remains, then he or she shall further
notify [tribe]. The agencies shall consult with the
tribes on a finding of eligibility and implement
appropriate treatment measures, if the find is
determined to be a Historical Resource under
CEQA, as defined in Section 15064.5(a) of the CEQA
Guidelines. Preservation in place is the preferred
treatment, if feasible. Work may not resume within
the no-work radius until the lead agencies, through
consultation as appropriate, determine that the site
either: 1) is not a Historical Resource under CEQA,
as defined in Section 15064.5(a) of the CEQA
Guidelines; or 2) that the treatment measures have
been completed to their satisfaction.
If the find includes human remains, or remains that
are potentially human, they shall ensure reasonable
protection measures are taken to protect the
discovery from disturbance (AB 2641). The
archaeologist shall notify the Alameda County
Coroner (per Section 7050.5 of the Health and
Attachment 2 Agenda Report Page 33
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-8 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
Safety Code). The provisions of Section 7050.5 of
the California Health and Safety Code, Section
5097.98 of the California PRC, and AB 2641 will be
implemented. If the coroner determines the
remains are Native American and not the result of a
crime scene, the coroner will notify the NAHC,
which then will designate a Native American Most
Likely Descendant (MLD) for the Project (Section
5097.98 of the PRC). The designated MLD will have
48 hours from the time access to the property is
granted to make recommendations concerning
treatment of the remains. If the landowner does
not agree with the recommendations of the MLD,
the NAHC can mediate (Section 5097.94 of the
PRC). If no agreement is reached, the landowner
must rebury the remains where they will not be
further disturbed (Section 5097.98 of the PRC). This
will also include either recording the site with the
NAHC or the appropriate Information Center; using
an open space or conservation zoning designation
or easement; or recording a reinternment
document with the county in which the property is
located (AB 2641). Work may not resume within the
no-work radius until the lead agencies, through
consultation as appropriate, determine that the
Attachment 2 Agenda Report Page 34
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-9 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
treatment measures have been completed to their
satisfaction.
Paleontological Resources
GEO-1: If any paleontological resources (i.e., fossils) are found during Project construction, construction shall
be halted immediately in the subject area and the area
shall be isolated using orange or yellow fencing until
the City is notified and the area is cleared for future work. A qualified paleontologist shall be retained to
evaluate the find and recommend appropriate
treatment of the inadvertently discovered
paleontological resources. If the City resumes work in a location where paleontological remains have been
discovered and cleared, the City will have a
paleontologist onsite to confirm that no additional
paleontological resources are in the area.
Action:
Notify City of Piedmont
and Qualified
Paleontologist in the event
of a discovery.
Implement appropriate
treatment of found
materials.
Timing:
Ongoing and as needed
during construction
activities.
Project
Paleontologist/
Construction
Manager
Initials
Date
City of Piedmont
Initials
Date
Noise
NOI-1 Noise Mitigation. The Project improvement
and construction plans will include the following
requirements for construction activities:
Construction contacts must specify that all
construction equipment, fixed or mobile, shall be
Action:
Construction noise
mitigation.
Timing:
Construction
Manager
Initials
City of Piedmont
Initials
Attachment 2 Agenda Report Page 35
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-10 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
equipped with properly operating and maintained
mufflers and other state-required noise attenuation
devices.
A sign, legible at a distance of 50 feet, shall be
posted at the Project construction sites providing a
contact name and a telephone number where
residents can inquire about the construction
process and register complaints. This sign shall
indicate the dates and duration of construction
activities. In conjunction with this required posting,
a noise disturbance coordinator will be identified to
address construction noise concerns received. The
coordinator shall be responsible for responding to
any local complaints about construction noise.
When a complaint is received, the disturbance
coordinator shall notify the City within 24 hours of
the complaint and determine the cause of the noise
complaint (starting too early, malfunctioning
muffler, etc.) and shall implement reasonable
measures to resolve the complaint, as deemed
acceptable by the City. All signs posted at the
construction site shall include the contact name
and the telephone number for the noise
disturbance coordinator.
Ongoing and as needed
during construction
activities.
Date Date
Attachment 2 Agenda Report Page 36
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-11 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
Identification of construction noise reduction
methods. These reduction methods may include
shutting off idling equipment (5 minutes), installing
temporary acoustic barriers around stationary
construction noise sources, maximizing the
distance between construction equipment staging
areas and occupied residential areas, and using
electric air compressors and similar power tools.
During construction, stationary construction
equipment shall be placed such that emitted noise
is directed away from sensitive noise receivers.
Per Piedmont City Code Section 12.8, Noise
Declared Nuisance, construction and demolition
shall be prohibited between the hours of 6:00 p.m.
and 8:00 a.m. Sunday evening through Saturday
morning and between 6:00 p.m. and 9:00 a.m.
Saturday evening through Sunday morning.
NOI-2: Temporary Noise Barriers. In order to reduce
construction noise, during the excavation and paving
phases, all other portable stationary noise sources (e.g., excavators, compactors, generators, compressors, etc.)
will be screened from sensitive receptors in a manner
that breaks the line of sight between the construction
equipment and these residences. Temporary noise
Action:
Temporary Noise Barriers.
Timing:
Ongoing and as needed
during construction
activities.
Construction
Manager
Initials
City of Piedmont
Initials
Attachment 2 Agenda Report Page 37
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-12 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
barriers/enclosures shall have a sound transmission
class (STC) of 10 or greater in accordance with
American Society for Testing and Materials Test
Method E90, or at least 2 pounds per square foot to
ensure adequate transmission loss characteristics. The
temporary noise barrier can consist of a solid plywood
fence at least 7/16-inch in thickness and/or flexible
sound curtains, such as an 18-ounce tarp or a 2-inchthick fiberglass blanket, attached to chain link fencing.
The length, height, and location of the temporary noise barrier shall be adequate to assure proper acoustical
performance. Specifically, the barrier must completely
break the line of sight between the construction site
and adjacent residences along the linear Project Site,
must be free of degrading holes or gaps and must not
be flanked by nearby reflective surfaces. All noise
control barrier walls/enclosures shall be designed to
preclude structural failure due to such factors as winds, shear, shallow soil failure, earthquakes, and erosion.
Date Date
Transportation
TRANS-1: Construction Traffic Management Plan.
Prior to commencing construction of the Proposed
Project, a construction traffic management plan
Action:
Prepare a Traffic
Management Plan.
Construction
Manager
Construction
Manager/ City of
Piedmont
Attachment 2 Agenda Report Page 38
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-13 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
(Traffic Plan) shall be prepared by the Contractor, in
coordination with the City. The management plan shall
be detailed and comprehensive to adequately mitigate
potential conflicts between baseline and constructionrelated traffic. The Traffic Plan will include, at a minimum, the following measures:
A. Adequate off-street worker parking shall be
provided along the pipeline route.
B. A flagman or signal-controlled one-way trafficcontrol operation shall be provided where twoway traffic operation is impractical or unsafe.
C. Roadway disturbances shall be minimized during
non-working hours; open trenches shall be
covered with steel plates or by the use of
temporary backfill during non-working hours.
D. Temporary steel plate trench crossings shall be
provided as needed to maintain access to homes,
farms, and businesses.
E. Construction sites shall be posted with
appropriate warning signage at least one week
prior to construction to allow local residents to
select an alternative travel route.
Timing:
Prior to Construction. Initials
Date
Initials
Date
Attachment 2 Agenda Report Page 39
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-14 December 2024 Mitigation Measure
Implementation Actions
and Timing
Implementation
Responsibility
Responsibility
for Oversight of
Compliance/
Verification
Agency
Coordination
Comments
F. Construction staging areas shall be provided to
minimize storage of equipment and materials in
the traffic lanes.
G. All paved surfaces disturbed during construction
shall be repaved when work is complete.
H. The Contractor shall provide traffic control and
diversion plans for review and approval by each
appropriate jurisdiction.
I. To minimize delays in emergency response during
project construction, emergency providers shall be
notified in advance. Police, fire protection, and
ambulance services shall be notified in advance of
the times, duration, and location of construction
activities throughout the project’s construction
process.
To be signed when all mitigation measures have been completed:
City of Piedmont
Signature
Attachment 2 Agenda Report Page 40
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project Final Mitigated Negative Declaration Approval
Mitigation Monitoring and Reporting Plan 5-15 December 2024 Printed Name Date
Attachment 2 Agenda Report Page 41
6.0 LIST OF APPENDICES
Appendix A – Notice of Intent
Appendix B – Proof of Publication
Appendix C – CDFW Filing Fee Receipt
Appendix D – Draft Initial Study and Mitigated Negative Declaration for the City of Piedmont Sewer Rehabilitation Phase 6 Project
Attachment 2 Agenda Report Page 42
APPENDIX A
Notice of Intent
Attachment 2 Agenda Report Page 43
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION AND INITIAL STUDY 1 DATE: October 25, 2024
TO: Responsible Agencies, Interested Parties, and Organizations SUBJECT: City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project The City of Piedmont (City) is the California Environmental Quality Act (CEQA) Lead Agency for the proposed City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project (Proposed Project). The City has directed the preparation of an Initial Study (IS) Mitigated Negative Declaration (MND) in compliance with CEQA.
Project Location: The approximately 17,626 linear feet of sanitary sewer collection lines are located in Piedmont, Alameda County, California. The Project is located in various locations within the City of Piedmont.
Project Description: The Project proposes to rehabilitate 17,626 feet of existing sanitary sewer collection pipe utilizing the pipe bursting method (between 6 and 15-inch diameter pipes). The existing pipelines are located within existing paved roads and the front and backyard property lines of private properties in the City of Piedmont in Alameda County, California. The Project is phase 6 of the City’s ongoing Sanitary Sewer Rehabilitation Projects.
Potentially Significant Environmental Impacts: Potentially significant impacts to air quality, cultural resources, paleontological resources, noise, and transportation were identified in the Initial Study. All impacts would be reduced to a less than significant level with the implementation of identified mitigation measures.
Hazardous Waste Sites: Pursuant to Section 15087(c)(6) of the Guidelines for California Environmental Quality Act, DGS acknowledges the non-existence of hazardous waste sites within the Project area reviewed by this Mitigated Negative Declaration (MND).
IS/MND Document Review and Availability: The public review and comment period for the Draft IS/MND will extend for 30 days starting October 25, 2024 and ending November 25, 2024. The Draft IS/MND can be viewed and/or downloaded at the following website:
https://piedmont.ca.gov/services___departments/public_works/city_projects Comments/Questions: Comments and/or questions regarding the IS/MND may be directed to:
Daniel Gonzales, City of Piedmont
120 Vista Avenue
Piedmont, CA 94611
[email protected]
cc: Amberly Morgan
2525 Warren Drive
Rocklin, CA 95677
[email protected]
Attachment 2 Agenda Report Page 44
APPENDIX B
Proof of Publication
Attachment 2 Agenda Report Page 45
Bay Area News Group • AdTaxi • Digital First Media
The Mercury News • Daily News • Silicon Valley Community Newspapers East Bay Times • East Bay Community Newspapers • Hills Newspapers Oakland Tribune • The Daily Review • The Argus
Milpitas Post • Berryessa Sun
Marin Independent Journal
Northern California Community Newspapers
Monterey County Herald • Santa Cruz Sentinel • La Ganga Especial Vacaville Reporter • Vallejo Times-Herald • Woodland Daily Democrat Lake County Record-Bee • Penny Saver •The Ukiah Daily Journal • Hometown Shopper Chico Enterprise-Record • Oroville Mercury-Register • Paradise Post • Red Bluff Daily News The Willits News • Fort Bragg Advocate-News • The Mendocino Beacon Eureka Times-Standard • Tri-City Weekly • Redwood Times Advertising Payment Receipt
ECORP CONSULTING, INC.
2525 WARREN DRIVE
ROCKLIN, CA 95677
Account Number:
916-782-9100
Customer:
Phone:
3822658
Credit Card Number:
Payment Method:
Payment Amount:
Transaction Type:
Transaction Date:
Order Number:
Reference Number:
Charge to:
Credit to Transaction Number:
Invoice Text:
Payment
0006859822
Expiration Date: 7/28/2029
261.06 Credit
Card
54532Q
North CNP
P1137000
10/22/2024
Invoice Notes: alloyd - City of Piedmont San Sewer Rehab Please note: If you pay by bank card, your card statement will show "CAL NEWSPAPER ADV" or "CALIFORNIA NEWSPAPER ADVERTISING SERVICES", depending on the type of card used.
Date printed: Tuesday, October 22, 2024 3515540 C:\Program Files\NEWSCYCLE Solutions\AdBase Services\AdbaseWebServices\583014b5-8ffb-48fd-b263-cfa94461db6d_BANG Payment Receipt.rpt r.BP331-04/07/16 Redacted
Attachment 2 Agenda Report Page 46
APPENDIX C
CDFW Filing Fee Receipt
To Be Provided Upon Filing Of Final Document
Attachment 2 Agenda Report Page 47
APPENDIX D
Draft Initial Study and Mitigated Negative Declaration
for the
Draft Initial Study and Mitigated Negative Declaration for the City of Piedmont Sewer Rehabilitation Phase 6 Project
Attachment 2 Agenda Report Page 48
DRAFT
Initial Study and Mitigated Negative Declaration
City of Piedmont – Sanitary Sewer Rehabilitation
Phase 6 Project
City of Piedmont, Alameda County, California
Lead Agency:
City of Piedmont
120 Vista Avenue
Piedmont, CA 94611
Prepared by:
2525 Warren Drive
Rocklin, CA 95677
October 2024
ECORP Consulting, Inc.
ENVIRONMENTAL CONSULTANTS
Attachment 2 Agenda Report Page 49
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 50
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 1-1 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2022-100
DRAFT MITIGATED NEGATIVE DECLARATION
Lead Agency: City of Piedmont
Project Location: The approximately 17,626 linear feet of sanitary sewer collection lines are located in Piedmont, Alameda County, California. The Project is located in various locations within the City of Piedmont.
Project Description
Summary:
The Project proposes to rehabilitate 17,626 feet of existing sanitary sewer collection pipe utilizing the pipe bursting method (between 6 and 15-inch diameter pipes). The existing pipelines are located within existing paved roads and the front and backyard property lines of private properties in the City of Piedmont in Alameda County, California. The Project is part of the City’s Sanitary Sewer Rehabilitation Project.
Public Review Period: October 25, 2024 to November 25, 2024 Mitigation Measures Incorporated into the Project to Avoid Significant Effects:
Air Quality
AQ-1: Adhere to Bay Area Air Quality Management District Basic Construction Best Management Practices. The Project shall implement the following Bay Area Air Quality Management Construction Best Management Practices:
All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. All haul trucks transporting soil, sand, or other loose material off-site shall be covered.
All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.
All vehicle speeds on unpaved roads shall be limited to 15 mph. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.
All trucks and equipment, including their tires, shall be washed off prior to leaving the site.
Attachment 2 Agenda Report Page 51
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 1-2 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Unpaved roads providing access to sites located 100 feet or further from a paved road shall be treated with a 6- to 12-inch layer of compacted layer of wood chips, mulch, or gravel.
Publicly visible signs shall be posted with the telephone number and name of the person to contact at the lead agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s General Air Pollution Complaints number shall also be visible to ensure compliance with applicable regulations.
Cultural Resources
CUL-1: Archaeological (Spot Checking). In Project areas with moderate to low archaeological sensitivity, a program of intermittent monitoring (spot-checking) of insertion pit excavation shall be developed and implemented by a qualified archaeologist.
In the event that presently unanticipated prehistoric and/or historic period cultural resources of significance are encountered within excavation activities, all activity in the area of discovery shall cease until the City retains the services of a qualified archaeological consultant who shall examine the findings, assess their significance, and offer proposals for any procedures deemed appropriate to further investigate and/or mitigate adverse impacts to those cultural resources that have been encountered
CUL-2: Unanticipated Discoveries. There always remains the potential for ground-disturbing activities to expose previously unrecorded cultural resources. Both CEQA and Section 106 of the NHPA require the lead agency to address any unanticipated cultural resource discoveries during Project construction. Therefore, the following procedures shall be implemented:
If subsurface deposits believed to be cultural or human in origin are discovered during construction, all work must halt within a 100-foot radius of the discovery. A qualified professional archaeologist, meeting the Secretary of the Interior’s Professional Qualification Standards for prehistoric and historic archaeology, shall be retained to evaluate the significance of the find, and shall have the authority to modify the no-work radius as appropriate, using professional judgment. The following notifications shall apply, depending on the nature of the find:
If the professional archaeologist determines that the find does not represent a cultural resource, work may resume immediately and no agency notifications are required.
If the professional archaeologist determines that the find does represent a cultural resource from any time period or cultural affiliation, the archaeologist shall immediately notify the lead agencies. The agencies shall consult on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined by CEQA or a historic property under Section 106 NHPA, if applicable. Work may not resume within the no-work radius until the lead agencies, through consultation as appropriate, determine that Attachment 2 Agenda Report Page 52
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 1-3 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 the site either: 1) is not a Historical Resource under CEQA or a Historic Property under Section 106; or 2) that the treatment measures have been completed to their satisfaction.
If the find represents a Native American or potentially Native American resource that does not include human remains, then he or she shall further notify [tribe]. The agencies shall consult with the tribes on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines. Preservation in place is the preferred treatment, if feasible. Work may not resume within the nowork radius until the lead agencies, through consultation as appropriate, determine that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) that the treatment measures have been completed to their satisfaction.
If the find includes human remains, or remains that are potentially human, they shall ensure reasonable protection measures are taken to protect the discovery from disturbance (AB 2641). The archaeologist shall notify the Alameda County Coroner (per Section 7050.5 of the Health and Safety Code). The provisions of Section 7050.5 of the California Health and Safety Code, Section 5097.98 of the California PRC, and AB 2641 will be implemented. If the coroner determines the remains are Native American and not the result of a crime scene, the coroner will notify the NAHC, which then will designate a Native American Most Likely Descendant (MLD) for the Project (Section 5097.98 of the PRC). The designated MLD will have 48 hours from the time access to the property is granted to make recommendations concerning treatment of the remains. If the landowner does not agree with the recommendations of the MLD, the NAHC can mediate (Section 5097.94 of the PRC). If no agreement is reached, the landowner must rebury the remains where they will not be further disturbed (Section 5097.98 of the PRC). This will also include either recording the site with the NAHC or the appropriate Information Center; using an open space or conservation zoning designation or easement; or recording a reinternment document with the county in which the property is located (AB 2641). Work may not resume within the no-work radius until the lead agencies, through consultation as appropriate, determine that the treatment measures have been completed to their satisfaction.
Paleontological Resources
PALEO-1: Discovery of Unknown Resources
If any paleontological resources (i.e., fossils) are found during Project construction, construction shall be halted immediately in the subject area and the area shall be isolated using orange or yellow fencing until the City is notified and the area is cleared for future work. A qualified paleontologist shall be retained to evaluate the find and recommend appropriate treatment of the inadvertently discovered paleontological resources. If the City resumes work in a location where paleontological remains have been discovered and Attachment 2 Agenda Report Page 53
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 1-4 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 cleared, the City will have a paleontologist onsite to confirm that no additional paleontological resources are in the area.
Noise
NOI-1: The Project improvement and construction plans will include the following requirements for construction activities:
Construction contacts must specify that all construction equipment, fixed or mobile, shall be equipped with properly operating and maintained mufflers and other staterequired noise attenuation devices. A sign, legible at a distance of 50 feet, shall be posted at the Project construction sites providing a contact name and a telephone number where residents can inquire about the construction process and register complaints. This sign shall indicate the dates and duration of construction activities. In conjunction with this required posting, a noise disturbance coordinator will be identified to address construction noise concerns received. The coordinator shall be responsible for responding to any local complaints about construction noise. When a complaint is received, the disturbance coordinator shall notify the City within 24 hours of the complaint and determine the cause of the noise complaint (starting too early, malfunctioning muffler, etc.) and shall implement reasonable measures to resolve the complaint, as deemed acceptable by the City. All signs posted at the construction site shall include the contact name and the telephone number for the noise disturbance coordinator. Identification of construction noise reduction methods. These reduction methods may include shutting off idling equipment (5 minutes), installing temporary acoustic barriers around stationary construction noise sources, maximizing the distance between construction equipment staging areas and occupied residential areas, and using electric air compressors and similar power tools. During construction, stationary construction equipment shall be placed such that emitted noise is directed away from sensitive noise receivers. Per Piedmont City Code Section 12.8, Noise Declared Nuisance, construction and demolition shall be prohibited between the hours of 6:00 p.m. and 8:00 a.m. Sunday evening through Saturday morning and between 6:00 p.m. and 9:00 a.m. Saturday evening through Sunday morning.
NOI-2: In order to reduce construction noise, during the excavation and paving phases, all other portable stationary noise sources (e.g., excavators, compactors, generators, compressors, etc.) will be screened from sensitive receptors in a manner that breaks the line of sight between the construction equipment and these residences. Temporary noise barriers/enclosures shall have a sound transmission class (STC) of 10 or greater in accordance with American Society for Testing and Materials Test Method E90, or at least 2 pounds per square foot to ensure adequate transmission loss characteristics. The temporary noise barrier can consist of a solid plywood fence at least 7/16-inch in thickness and/or Attachment 2 Agenda Report Page 54
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 1-5 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 flexible sound curtains, such as an 18-ounce tarp or a 2-inch-thick fiberglass blanket, attached to chain link fencing. The length, height, and location of the temporary noise barrier shall be adequate to assure proper acoustical performance. Specifically, the barrier must completely break the line of sight between the construction site and adjacent residences along the linear Project Site, must be free of degrading holes or gaps and must not be flanked by nearby reflective surfaces. All noise control barrier walls/enclosures shall be designed to preclude structural failure due to such factors as winds, shear, shallow soil failure, earthquakes, and erosion.
Transportation
TRANS-1: Construction Traffic Management Plan. Prior to commencing construction of the Proposed Project, a construction traffic management plan (Traffic Plan) shall be prepared by the Contractor, in coordination with the City. The management plan shall be detailed and comprehensive to adequately mitigate potential conflicts between baseline and construction-related traffic. The Traffic Plan will include, at a minimum, the following measures:
A. Adequate off-street worker parking shall be provided along the pipeline route.
B. A flagman or signal-controlled one-way traffic-control operation shall be provided where two-way traffic operation is impractical or unsafe.
C. Roadway disturbances shall be minimized during non-working hours; open trenches shall be covered with steel plates or by the use of temporary backfill during non-working hours.
D. Temporary steel plate trench crossings shall be provided as needed to maintain access to homes, farms, and businesses.
E. Construction sites shall be posted with appropriate warning signage at least one week prior to construction to allow local residents to select an alternative travel route.
F. Construction staging areas shall be provided to minimize storage of equipment and materials in the traffic lanes.
G. All paved surfaces disturbed during construction shall be repaved when work is complete.
H. The Contractor shall provide traffic control and diversion plans for review and approval by each appropriate jurisdiction.
I. To minimize delays in emergency response during project construction, emergency providers shall be notified in advance. Police, fire protection, and ambulance services shall be notified in advance of the times, duration, and location of construction activities throughout the project’s construction process.
Attachment 2 Agenda Report Page 55
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 1-6 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Attachment 2 Agenda Report Page 56
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. i October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
TABLE OF CONTENTS
1.0 BACKGROUND ................................................................................................................................................................. 1-1
1.1 Summary ............................................................................................................................................................ 1-1
1.2 Introduction ...................................................................................................................................................... 1-1
2.0 PROJECT DESCRIPTION ................................................................................................................................................ 2-1
2.1 Project Background ....................................................................................................................................... 2-1
2.2 Project Location .............................................................................................................................................. 2-1
2.3 Project Characteristics .................................................................................................................................. 2-1
2.3.1 Existing Facilities ............................................................................................................................ 2-1
2.3.2 Proposed Project ........................................................................................................................... 2-2
2.4 Project Staging ................................................................................................................................................ 2-6
2.5 Project Timing ................................................................................................................................................. 2-6
2.6 Regulatory Requirements, Permits, and Approvals .......................................................................... 2-7
2.7 Consultation With California Native American Tribe(s) .................................................................. 2-8
3.0 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED AND Determination ......................................... 3-1
3.1 Environmental Factors Potentially Affected......................................................................................... 3-1
4.0 ENVIRONMENTAL CHECKLIST AND DISCUSSION ............................................................................................ 4-1
4.1 Aesthetics .......................................................................................................................................................... 4-1
4.1.1 Environmental Setting ................................................................................................................. 4-1
4.1.2 Aesthetics (I) Environmental Checklist and Discussion .................................................. 4-2
4.1.3 Mitigation Measures .................................................................................................................... 4-4
4.2 Agriculture and Forestry Resources ........................................................................................................ 4-4
4.2.1 Environmental Setting ................................................................................................................. 4-4
4.2.2 Agriculture and Forestry Resources (II) Environmental Checklist and Discussion ......................................................................................................................................... 4-4
4.2.3 Mitigation Measures .................................................................................................................... 4-6
4.3 Air Quality ......................................................................................................................................................... 4-6
4.3.1 Environmental Setting ................................................................................................................. 4-6
4.3.2 Ambient Air Quality ...................................................................................................................... 4-7
4.3.3 Regulatory Setting ........................................................................................................................ 4-8
4.3.4 Air Quality (III) Environmental Checklist and Discussion ............................................. 4-12
4.3.5 Mitigation Measures .................................................................................................................. 4-19
4.4 Biological Resources ................................................................................................................................... 4-19
4.4.1 Environmental Setting ............................................................................................................... 4-19 Attachment 2 Agenda Report Page 57
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. ii October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.4.2 Biological Resources (IV) Environmental Checklist and Discussion ......................... 4-22
4.4.3 Mitigation Measures .................................................................................................................. 4-24
4.5 Cultural Resources ....................................................................................................................................... 4-24
4.5.1 Environmental Setting ............................................................................................................... 4-24
4.5.2 Cultural Resources (V) Environmental Checklist and Discussion .............................. 4-27
4.5.3 Mitigation Measures .................................................................................................................. 4-28
4.6 Energy ............................................................................................................................................................... 4-29
4.6.1 Environmental Setting ............................................................................................................... 4-30
4.6.2 Energy (VI) Environmental Checklist and Discussion .................................................... 4-31
4.6.3 Mitigation Measures .................................................................................................................. 4-32
4.7 Geology and Soils ........................................................................................................................................ 4-32
4.7.1 Environmental Setting ............................................................................................................... 4-32
4.7.2 Geology and Soils (VII) Environmental Checklist and Discussion ............................ 4-36
4.7.3 Mitigation Measures .................................................................................................................. 4-40
4.8 Greenhouse Gas Emissions ...................................................................................................................... 4-40
4.8.1 Environmental Setting ............................................................................................................... 4-40
4.8.2 Regulatory Setting ...................................................................................................................... 4-40
4.8.3 Greenhouse Gas Emissions (VIII) Environmental Checklist and Discussion ....................................................................................................................................... 4-42
4.8.4 Mitigation Measures .................................................................................................................. 4-44
4.9 Hazards and Hazardous Materials ......................................................................................................... 4-44
4.9.1 Environmental Setting ............................................................................................................... 4-44
4.9.2 Hazards and Hazardous Materials (IX) Environmental Checklist and Discussion ....................................................................................................................................... 4-45
4.9.3 Mitigation Measures .................................................................................................................. 4-48
4.10 Hydrology and Water Quality ................................................................................................................. 4-49
4.10.1 Environmental Setting ............................................................................................................... 4-49
4.10.2 Hydrology and Water Quality (X) Environmental Checklist and Discussion ....................................................................................................................................... 4-51
4.11 Land Use and Planning .............................................................................................................................. 4-53
4.11.1 Environmental Setting ............................................................................................................... 4-53
4.11.2 Land Use and Planning (XI) Environmental Checklist and Discussion .................... 4-53
4.11.3 Mitigation Measures .................................................................................................................. 4-54
4.12 Mineral Resources ........................................................................................................................................ 4-54
4.12.1 Environmental Setting ............................................................................................................... 4-54 Attachment 2 Agenda Report Page 58
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. iii October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.12.2 Mineral Resources (XII) Environmental Checklist and Discussion ............................ 4-55
4.12.3 Mitigation Measures .................................................................................................................. 4-56
4.13 Noise ................................................................................................................................................................. 4-56
4.13.1 Environmental Setting ............................................................................................................... 4-56
4.13.2 Noise (XIII) Environmental Checklist and Discussion .................................................... 4-60
4.13.3 Mitigation Measures .................................................................................................................. 4-64
4.14 Population and Housing ........................................................................................................................... 4-65
4.14.1 Environmental Setting ............................................................................................................... 4-65
4.14.2 Population and Housing (XIV) Environmental Checklist and Discussion .............. 4-66
4.14.3 Mitigation Measures .................................................................................................................. 4-66
4.15 Public Services ............................................................................................................................................... 4-66
4.15.1 Environmental Setting ............................................................................................................... 4-66
4.15.2 Public Services (XV) Environmental Checklist and Discussion ................................... 4-67
4.16 Recreation ....................................................................................................................................................... 4-68
4.16.1 Environmental Setting ............................................................................................................... 4-68
4.16.2 Recreation (XVI) Materials Checklist .................................................................................... 4-69
4.16.3 Mitigation Measures .................................................................................................................. 4-69
4.17 Transportation ............................................................................................................................................... 4-69
4.17.1 Environmental Setting ............................................................................................................... 4-69
4.17.2 Transportation (XVII) Environmental Checklist and Discussion ................................ 4-70
4.17.3 Mitigation Measures .................................................................................................................. 4-71
4.18 Tribal Cultural Resources .......................................................................................................................... 4-72
4.18.1 Environmental Setting ............................................................................................................... 4-72
4.18.2 Regulatory Setting ...................................................................................................................... 4-74
4.18.3 Summary of Consultation ........................................................................................................ 4-75
4.18.4 Tribal Cultural Resources (XVIII) Environmental Checklist and Discussion ....................................................................................................................................... 4-76
4.18.5 Mitigation Measures .................................................................................................................. 4-77
4.19 Utilities and Service Systems ................................................................................................................... 4-77
4.19.1 Environmental Setting ............................................................................................................... 4-77
4.19.2 Utilities and Service Systems (XIX) Environmental Checklist and Discussion ....................................................................................................................................... 4-78
4.19.3 Mitigation Measures .................................................................................................................. 4-80
4.20 Wildfire ............................................................................................................................................................. 4-80 Attachment 2 Agenda Report Page 59
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. iv October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.20.1 Environmental Setting ............................................................................................................... 4-80
4.20.2 Wildfire (XX) Environmental Checklist and Discussion ................................................. 4-80
4.21 Mandatory Findings of Significance ..................................................................................................... 4-82
4.21.1 Mandatory Findings of Significance (XXI) Environmental Checklist and Discussion ....................................................................................................................................... 4-82
5.0 Compliance with Federal Regulations .................................................................................................................... 5-1
5.1 Federal Regulations Evaluation ................................................................................................................ 5-1
5.1.1 Archaeological and Historic Preservation Act .................................................................... 5-1
5.1.2 Clean Air Act .................................................................................................................................... 5-1
5.1.3 Coastal Barriers Resources Act ................................................................................................. 5-2
5.1.4 Coastal Zone Management Act ............................................................................................... 5-2
5.1.5 Endangered Species Act, Section 7 ........................................................................................ 5-3
5.1.6 Environmental Justice .................................................................................................................. 5-3
5.1.7 Farmland Protection Policy Act ................................................................................................ 5-6
5.1.8 Fish and Wildlife Coordination Act ......................................................................................... 5-6
5.1.9 Floodplain Management ............................................................................................................ 5-7
5.1.10 Magnuson-Stevens Fishery Conservation and Management Act .............................. 5-7
5.1.11 Migratory Bird Treaty Act of 1918 .......................................................................................... 5-8
5.1.12 National Historic Preservation Act, Section 106................................................................ 5-8
5.1.13 Protection of Wetlands ............................................................................................................... 5-9
5.1.14 Rivers and Harbors Act, Section 10 ...................................................................................... 5-10
5.1.15 Safe Drinking Water Act ........................................................................................................... 5-10
5.1.16 Wild and Scenic Rivers Act ...................................................................................................... 5-10
6.0 ALTERNATIVES DESCRIPTIONS AND ANALYSIS ................................................................................................. 6-1
7.0 LIST OF PREPARERS ....................................................................................................................................................... 7-1
7.1 City of Piedmont ............................................................................................................................................. 7-1
7.2 ECORP Consulting, Inc. ................................................................................................................................ 7-1
7.3 Bennett Engineering ..................................................................................................................................... 7-1
8.0 BIBLIOGRAPHY ................................................................................................................................................................. 8-1
LIST OF TABLES
Table 2-1 Construction Operations .......................................................................................................................................... 2-7 Table 4.3-1. Summary of Ambient Air Quality Data .......................................................................................................... 4-7 Attachment 2 Agenda Report Page 60
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. v October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Table 4.3-2. Attainment Status of Criteria Pollutants in the Alameda County Portion of the SFBAAB ......... 4-8 Table 4.3-3. BAAQMD Criteria Air Pollutants Significance Thresholds .................................................................... 4-11 Table 4.3-4. Federal General Conformity De Minimis Emissions Levels in Alameda County .......................... 4-11 Table 4.3-5. Construction-Related Criteria Air Pollutant Emissions .......................................................................... 4-14 Table 4.3-6. Construction-Related Emissions (USEPA Conformity Determination Analysis) ........................... 4-15 Table 4.6-1. Automotive Fuel Consumption in Alameda County from 2019 to 2023 ........................................ 4-30 Table 4.6-2. Proposed Fuel Consumption ........................................................................................................................... 4-31 Table 4.7-1. Soil Series Mapped in the Proposed Project Area................................................................................... 4-35 Table 4.8-1. Construction-Related Greenhouse Gas Emissions .................................................................................. 4-42 Table 4.13-1. ANSI Standard 12.9-2013/Part 3 A-weighted Sound Levels Corresponding to Land Use and Population Density .............................................................................................................................................. 4-59 Table 4.13-2. Construction Average (dBA) Noise Levels at Nearest Receptors (30 Feet Distant) ................. 4-61 Table 4.13-3. Representative Vibration Source Levels for Construction Equipment .......................................... 4-63 Table 4.13-4. Construction Vibration Levels at 30 Feet .................................................................................................. 4-63 Table 5.1.6-1 Housing Tenure by Race/Ethnicity in Piedmont ...................................................................................... 5-5
LIST OF FIGURES
Figure 2-1: Project Location and Vicinity ............................................................................................................................... 2-4 Figure 2-2: Project Area Map ...................................................................................................................................................... 2-5 Figure 2-3: Schematic of a Pneumatic Pipe Bursting Process........................................................................................ 2-6
LIST OF APPENDICES
Appendix A –Air Quality and Greenhouse Gas Emissions Assessment Memorandum, ECORP, 2022 Appendix B – Biological Resources Assessment. ECORP, 2022 Appendix C – Cultural Resources Inventory Report (Confidential), ECORP, 2022 Appendix D – Energy Consumption Assessment Memorandum, ECORP, 2022 Appendix E –Noise Impact Memorandum, ECORP, 2022
Appendix F – Engineering Project Report, Bennett 2024
Attachment 2 Agenda Report Page 61
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. vi October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
LIST OF ACRONYMS AND ABBREVIATIONS
Term Definition
µg/m3 Micrograms per cubic meter
˚F Degrees Fahrenheit
AB Assembly Bill
ABAG Association of Bay Area Governments
ACDEH Alameda County Department of Environmental Health AHPA Archaeological and Historic Preservation Act
AMIP Asset Management Implementation Plan
AMI area median income
amsl above mean sea level
ANSI American National Standards Institute
APE Area of Potential Effects
BAAQMD Bay Area Air Quality Management District
BRA Biological Resources Assessment
BSA Biological Study Area
CAAQS California Ambient Air Quality Standards
CAL FIRE California Department of Forestry and Fire Protection CalEEMod California Emissions Estimator Model
Caltrans California Department of Transportation
CAP Climate Action Plan
CAPCOA California Air Pollution Control Officers Association CARB California Air Resources Board
CBC California Building Code
CBRA Coastal Barrier Resources Act
CBRS Coastal Barrier Resources System
CCR California Code of Regulations
CEQ Council on Environmental Quality
CEQA California Environmental Quality Act
CFR Code of Federal Regulations
CH4 Methane
CHP California Highway Patrol
CIPP Cured-in-Place Pipe
CNEL Community Noise Equivalent Level
CO Carbon Monoxide
CO2 carbon dioxide
CO2e carbon dioxide equivalent
CPUC California Public Utilities Commission
CUPA Certified Unified Program Agency
CWSRF Clean Water State Revolving Fund
CZMA Coastal Zone Management Act
DAC Disadvantaged Community
dB Decibel
dBA A-Weighted Decibel
DHS Department of Health Services
DOC Department of Conservation
DOF Department of Finance
DPM Diesel Particulate Matter
Attachment 2 Agenda Report Page 62
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. vii October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Term Definition
DPS Distinct Population Segment
DTSC Department of Toxic Substances Control
DWR Department of Water Resources
EBMUD East Bay Municipal Utility District
EBRPD East Bay Regional Parks District
EFH Essential Fish Habitat
EIR Environmental Impact Report
EO Executive Order
ESA Endangered Species Acts
FEMA Federal Emergency Management Agency
FPPA Farmland Protection Policy Act
FTA Federal Transit Administration
GHG Greenhouse Gas
HCD Housing and Community Development
HDPE high-density polyethylene
hp Horsepower
IS Initial Study
LHMP Local Hazard Mitigation Plan
LRA Local Responsibility Area
MBTA Migratory Bird Treaty Act
MLD Most Likely Descendent
MND Mitigated Negative Declaration
MRZ Mineral Resource Zone
MSA Magnuson-Stevens Fishery Conservation and Management Act MWWTP Main Wastewater Treatment Plant
NAAQS National Ambient Air Quality Standards
NAHC Native American Heritage Commission
NEPA National Environmental Policy Act
NHPA National Historic Preservation Act
NIOSH Occupational Safety and Health
NMFS National Marine Fisheries Service
N2O Nitrous Oxide
NOx Oxides of Nitrogen
NRCS Natural Resources Conservation Service
NRHP National Register of Historic Places
NWI National Wetland Inventory
NWSRS National Wild and Scenic Rivers System
OEHHA Office of Environmental Health Hazard Assessment
OHP Office of Historic Preservation
PCC Piedmont City Code
PG&E Pacific Gas and Electricity Company
PM Particulate Matter
PM2.5 Particulate Matter with a Diameter of 2.5 Microns or Less PM10 Particulate Matter with a Diameter of 10 Microns or Less PPD Piedmont Police Department
PPV Peak Particle Velocity
PRC Public Resources Code
Attachment 2 Agenda Report Page 63
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. viii October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Term Definition
PRD Piedmont Recreation Department
PUSD Piedmont Unified School District
RHA Rivers and Harbors Act of 1899
ROG Reactive Organic Gases
ROW Right-of-way
RWQCB Regional Water Quality Control Board
SB Senate Bill
SDWA Safe Drinking Water Act of 1974
SFBAAB San Francisco Bay Area Air Basin
SFBRWQCB San Francisco Bay Regional Water Quality Control Board SIP State Implementation Plan
SMARA Surface Mining and Reclamation Act of 1975
SR State Route
STC Sound Transmission Class
SWRCB State Water Resources Control Board
TCRs Tribal Cultural Resources
UCMP University of California Museum of Paleontology
USACE U.S. Army Corps of Engineers
USC U.S. Code
USEPA U.S. Environmental Protection Agency
USFWS U.S. Fish and Wildlife Service
VCP vitrified clay pipe
VHFHSZ Very High Fire Hazard Severity Zone
VMT Vehicle Miles Traveled
VOC Volatile Organic Compound
WWTP Wastewater Treatment Plant
Attachment 2 Agenda Report Page 64
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 1-1 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Project 2023-080
1.0 BACKGROUND
1.1 Summary
Project Title: City of Piedmont Sanitary Sewer Rehabilitation Project (Phase 6) Lead Agency Name and Address: City of Piedmont
120 Vista Avenue
Piedmont, CA 94611
Contact Person and Phone
Number:
Daniel Gonzales, Director of Public Works
(510) 420-3061
[email protected]
Project Location: The Proposed Project is located in various locations within the City of Piedmont, Alameda County
General Plan Designation: Low-Density Residential
Zoning: Zone A – Single Family Residential
1.2 Introduction
The City of Piedmont (City) is the Lead Agency for this California Environmental Quality Act (CEQA) Initial Study. This Initial Study has been prepared to identify and assess the anticipated environmental impacts of the City of Piedmont Sanitary Sewer Rehabilitation Project – Phase 6 (Project) to satisfy CEQA (Public Resources Code [PRC], Section 21000 et seq.) and state CEQA Guidelines (Title 14, California Code of Regulations [CCR] 15000 et seq.). CEQA requires that all state and local government agencies consider the environmental consequences before approving those projects. The city will use this CEQA Initial Study to determine which CEQA document is appropriate for the Project: Negative Declaration, Mitigated Negative Declaration (MND), or Environmental Impact Report (EIR).
The City of Piedmont is seeking funding for the Proposed Project under the State Water Resources Control Board’s (SWRCB) Clean Water State Revolving Fund (CWSRF) Program, which is partially funded through the U.S. Environmental Protection Agency (USEPA). Because of the federal nexus with the USEPA, projects seeking funding through the CWSRF Program are subject to federal laws and regulations (e.g., federal “cross-cutters”). Under the CWSRF Program, SWRCB uses a project’s CEQA document along with federal cross-cutting documentation in place of a National Environmental Policy Act (NEPA) document; this document is termed a “CEQA-Plus” document. Section 5 and 6 addresses the Project’s compliance with federal laws and regulations to satisfy the CEQA-Plus requirements.
In accordance with CEQA, this Initial Study/Mitigated Negative Declaration (IS/MND) will be circulated for a 30-day public review and comment period. Written comments on the Draft IS/MND should be submitted to:
John Wanger, City Engineer
City of Piedmont
[email protected]
510-420-3050
Attachment 2 Agenda Report Page 65
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 1-2 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Project 2023-080
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 66
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 2-1 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
2.0 PROJECT DESCRIPTION
2.1 Project Background
In 2001, the City of Piedmont (City) started the City’s Sanitary Sewer Rehabilitation Project with the objective to rehabilitate all 22 sub-basins in order to comply with Regional Water Quality Control Board (RWQCB) and a Consent Decree (entered into on September 22, 2014) requirements to minimize the number and impact of sanitary sewer overflows as well as to take a proactive approach in addressing infiltration/inflow (I/I) into their sewer system. The system consists of nearly 49 miles of sewer mains and portions of the City system have been in service for over 75 years. To date, approximately 79.7% of the City’s sewer system has been replaced, primarily with high-density polyethylene (HDPE) pipe via pipe bursting. It is the intent that approximately 40% of the remaining pipes will be replaced in Phase 6, with the remainder of the system rehabilitation to be completed in one or two subsequent phases over the next 5-10 years.
In 2015, an IS/MND was prepared for Phase 5 (State Clearinghouse No. 2015112038). Pursuant to Section 15150 of the California Environmental Quality Act (CEQA) Guidelines, the 2015 IS/MND is incorporated by reference into this IS/MND and is available for review upon request.
2.2 Project Location
The Proposed Project includes segments in various locations within the City of Piedmont, Alameda County. Project location and vicinity map can be found in Figure 2-1.
2.3 Project Characteristics
2.3.1 Existing Facilities
The sanitary sewer system collects sanitary sewer flows from residential, public facilities, mixed use, and recreational areas. There are no industrial users within the city. The city owns and maintains a sanitary sewer collection system which discharges first to the Oakland sanitary sewer collection system and then to the East Bay Municipal Utility District (EBMUD) interceptor. The city’s existing sanitary sewer system collects sanitary sewer flows from the city as well as wastewater from Oakland as it makes its way to the EBMUD No. 1 District Interceptor (interceptor). Once the effluent flows into the interceptor it is carried to the EBMUD Wastewater Treatment Plant (EBMUD WWTP) near the east side of the Bay Bridge. At the WWTP, influent undergoes secondary treatment prior to being discharged to the San Francisco Bay.
The City’s sanitary sewer collection system is comprised of 22 sub-basins which totals approximately 49 miles of 6 to 21-inch pipes. This includes approximately 8 miles of vitrified clay pipe (VCP), 37 miles of plastic pipe, 0.6 miles of reinforced concrete pipe (RCP), 0.2 miles of ductile iron or cast-iron pipe and 3.2 miles of a combination of asbestos concrete pipe (ACP) and steel pipe. The sanitary sewer pipes and manholes are located in City Right of Way (ROW) and front yards and back yards along property lines of private properties. The City can access and maintain the sanitary sewer facilities on private property. As of 2024, the city has rehabilitated and replaced 79.7% of its sanitary sewer system.
Attachment 2 Agenda Report Page 67
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 2-2 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
2.3.2 Proposed Project
The Proposed Project (Project) consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method (Figure 2-2, Project Area Map). The project will include the following elements:
14,578 linear feet of 6-inch pipe,
451 linear feet of 8-inch pipe,
28 linear feet of 10-inch pipe,
1,267 linear feet of 12-inch pipe,
241 linear feet of 15-inch pipe,
39 Main cleanout/Lamp hole replacements,
280 Lateral reconnection/Two-way cleanout installations, 4 manholes; and
124,550 sq ft of pavement restoration via grind and overlay o Majority of pavement in project will be t-sections and repairs around manholes and sewer lateral reconnections with full street pavement grind and overlay accomplished via the City’s pavement rehabilitation schedule subsequent to the sewer rehabilitation project.
It is assumed that the existing manholes will be reused and reconnected to the new pipe. All sewer main cleanouts and lamp holes (which are small vertical pipes or shafts between manholes that allows light to be lowered for inspecting the sewer lines) are assumed to be replaced and two-way cleanouts will be installed at the upstream limit of the rehabilitated lower sewer lateral behind the curb, sidewalk, or backyard. There are 280 assumed lateral reconnections/two-way cleanout installations by estimating adjacent properties of each pipe segment. By the end of the Proposed Project, the city will have rehabilitated/replaced 86% of its sewer mains.
The project will be designed based on the City’s Design Standards and Standard Specifications. Fusible HDPE pipe will be installed via pipe bursting in most cases. Pipe bursting will be used when there is sufficient room and access for the equipment, within Public ROW, and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels. In rare cases where pipe bursting equipment cannot be used, Cured-in-Place Pipe (CIPP) will be considered. Open trench will only be utilized when installing two-way cleanouts and reconnecting laterals to the new sanitary sewer pipelines.
Streets identified for partial repaving include:
• Bonita Ave.
• Waldo Ave.
Attachment 2 Agenda Report Page 68
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 2-3 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 • Highland Ave.
• Oakland Ave.
• Hardwick Ave.
• Landon Ct.
• Park Way.
• Highland Ct.
• Kingston Ave.
Sidewalks identified for partial repaving due to lateral reconnection:
• Hillside Ave.
• Blair Ave.
• Mesa Ave.
• Monte Ave.
• Pala Ave.
The pipe bursting construction method will involve replacing the existing pipeline via pneumatic bursting.
This requires access pits at either end of the pipe bursting operation and is typically accomplished at existing manholes by excavating around the cone and lid section and removing the lid, rim, riser, and cone of the manhole. The existing pipeline penetrations are also broken out to make room for the new pipe. Pipe bursting for sewer mains requires insertion pits to be dug out due to the size of the new pipe and utilizes manholes as receiving pits using pneumatic percussive blows behind a cutting head, which bursts the existing pipe, and pulls the new pipe through the newly created void. This allows the same diameter or a larger diameter pipe to be installed without excavation of the pipe. Pipe bursting is suitable for bursting VCP, plastic pipe, ductile iron, and cast-iron pipe (USEPA 2019). This method of replacement only requires excavation above the pipeline to re-connect laterals to homes at the mainline.
Attachment 2 Agenda Report Page 69
Map Date: 3/26/2024
Sources: ESRI, USGS
Location: N:\2023\2023-080 City of Piedmont Sanitary Sewer\MAPS\Location_Vicinity\PSS LnV.aprx - Piedmont Sanitary Sewer LnV 20240208 (lgalvez - 3/26/2024) Oakland East (1997, NAD 27)
CA 7.5-minute Topographic Quadrangle
US Geological Survey.
Alameda County, California
Unsectioned San Antonio
(V. and D. Peralta) Land Grant
Latitude (NAD83): 37.828462°
Longitude (NAD83): -122.231645°
Watershed: San Francisco Bay (18050004)
I
0 1,000 2,000
Scale in Feet
2023-080 City of Piedmont Sanitary Sewer Rehab
Figure 2-1. Project Location and Vicinity
Proposed Project- 4.08 ac.
ECORP Consulting, Inc. ___ _ .,. ENVIRONMENTAL CONSULTANTS ___ .,,,. .......
, - - Berkeley . ~
r-r-7 ~ d ''v',
San Francisco• ------
'·
)
Attachment 2 Agenda Report Page 70
SR13 NB
OAKLAND AV
LAKESHORE
AV
HIGHLAND AV
GRAND AV
BROADWAY
BROADWAY TE
MANDANA BL
MACARTHUR BL
MORAGA AV
RAGA AV
LAKE PARK AV
LAKE PARK AV
CROCKER AV
PIEDMONT AV
HAMPTON RD
HAMPTON RD
PLEASANT VALLEY AV
PLEASANT VALLEY AV
WILDWOOD AV
PARK BL
COLLEGE AV
I580 WB
BROADWAY TE
MANDANA BL
I580 EB
I580 EB
SR13 SB
Maxar
Map Date: 2/9/2024
Sources: Esri Imagery, Maxar (2022), Alameda County
Location: N:\2023\2023-080 City of Piedmont Sanitary Sewer\MAPS\Aerial_Maps\PSS Aerial.aprx - PSS Project Area 20240209 (kedwards - 2/9/2024) Map Contents
Project Area - 4.22 ac.
Staging Area - 11.78 ac.
I
0 1,500
Feet
2023-080 City of Piedmont Sanitary Sewer Rehab
Figure 2-2. Project Area Map
ECORP Consulting, Inc. ENV IRONMENTA L CONSULTANTS
Attachment 2 Agenda Report Page 71
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 2-6 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 A schematic of a pneumatic pipe bursting process is provided in Figure 2-3 and more information about the engineering specifications for the project can be found in Appendix F of this document.
Figure 2-3: Schematic of a Pneumatic Pipe Bursting Process
2.4 Project Staging
Temporary staging would occur at the City’s corporation yard located at 898 Red Rock Road, Piedmont, CA 94611. This site is paved, graveled, and currently highly disturbed.
2.5 Project Timing
This schedule may be extended pending approval of the construction contract and issuing a notice of award, and for potential extended supply times for materials. Also, current supply chain issues have increased lead times for some materials (pipe and fittings) and may delay the start date for Attachment 2 Agenda Report Page 72
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 2-7 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 groundbreaking. See Table 2-1 for a detailed breakdown of anticipated construction activities and approximate timeframe to completion.
Table 2-1 Construction Operations
Description of Activity Duration (approximate)
Excavation Operations*
• Rubber tired backhoe loader(s) (sized up to Cat 450)
• Trench excavator(s) (mini X (Cat 303)
• Wheel loader(s) (likely no larger than Cat 938),
• Trenching machines (not expected)
• Rock removal by hydraulic hammer on excavator (not expected to be required or very limited based on geotechnical investigation) • Compaction via in-trench hand compaction (wacker, vibraplate) • Sweeper
• Air Compressor(s)
Approximately 4-5 months
Hauling Operations*
• Rubber tired dump truck(s)
• l transfer truck and trailers
• Semi bottom and end dumps possible but not likely considering narrow and winding access
Approximately 3 months
Final Paving Operations
• Roller compactor(s)
• Pavers
• asphalt grinders
• asphalt cutters
• concrete saw
• Sweeper
Approximately 1 month
Other Equipment*
• Sprayers,
• air compressor,
• portable generator
Approximately 3 months
Total Duration: 5-6 months
*Note: Some of these activities will be done concurrently
2.6 Regulatory Requirements, Permits, and Approvals
Work for this project is anticipated to occur within the City right-of-way and on private property.
According to the Asset Management Implementation Plan, there are various legal means for the City to obtain access to sewers located on private property thus access to private backyards will be coordinated.
An encroachment permit is anticipated for work in the Public ROW and temporary construction easements are anticipated for work outside the right-of-way. EBMUD permits are anticipated for temporary water use during construction.
Attachment 2 Agenda Report Page 73
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 2-8 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
2.7 Consultation With California Native American Tribe(s) On February 20, 2024, the City sent letters via certified mail and email to the potentially interested tribes that were identified by the Native American Heritage Commission (NAHC). The City sent follow up emails on March 7, 2024. ECORP received a response from the Amah Mutsun Tribal Band of San Juan Bautista, recommending cultural sensitivity training and requested a Native American Monitor be present during earth moving activities. The City received a response from the Confederated Villages of Lisjan Nation, requesting copies of the records search results and the final report. The City received a response from the Ohlone Indian Tribe, requesting a copy of the record search results and the NAHC contact list. One letter to the Ohlone Indian Tribe was undeliverable by email.
The City of Piedmont sent AB52 consultation letters to the following tribes on September 20, 2024: Amah Mutsun Tribal Band of Mission San Juan Bautista, Indian Canyon Mutsun Band of Costanoan, Confederated Villages of Lisjan Nation, Muwekma Ohlone Indian Tribe of the SF Bay Area, Northern Valley Yokut.Ohlone Tribe, the Ohlone Indian Tribe, Costanoan Rumsen Carmel Tribe, and Wuksachi Indian Tribe/Eshom Valley Band. Section 4.18 of this IS/MND provides a summary of the notification process.
Attachment 2 Agenda Report Page 74
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 3-1 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
3.0 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED AND
DETERMINATION
3.1 Environmental Factors Potentially Affected
The environmental factors checked below would be potentially affected by the Project, involving at least one impact that is a Potentially Significant Impact, as indicated by the checklist on the following pages.
Aesthetics Hazards/Hazardous Materials Recreation
Agriculture and Forestry Resources Hydrology/Water Quality Transportation Air Quality Land Use and Planning Tribal Cultural Resources Biological Resources Mineral Resources Utilities and Service Systems Cultural Resources Noise Wildfire
Energy Paleontological Resources Mandatory Findings of Significance Geology and Soils Population and Housing
Greenhouse Gas Emissions Public Services
Determination
On the basis of this initial evaluation:
I find that the Project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the Project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the Project have been made by or agreed to by the Project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the Project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
I find that the Project MAY have a “potentially significant impact” or “potentially significant unless mitigated” impact on the environment but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
I find that although the Project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the Project, nothing further is required.
____________________________________________
Daniel Gonzales, City of Piedmont
Date: _________________
Daniel J Gonzales
Digitally signed by Daniel J
Gonzales
DN: C=US,
[email protected],
O="City of Piedmont ", OU="Public
Works ", CN=Daniel J Gonzales
Date: 2024.10.25 10:46:29-07'00'
I!]
□
□
□
Attachment 2 Agenda Report Page 75
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 3-2 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 76
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-1 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.0 ENVIRONMENTAL CHECKLIST AND DISCUSSION
4.1 Aesthetics
4.1.1 Environmental Setting
4.1.1.1 Visual Character of the Project Site
According to the Design and Preservation Element of Piedmont’s General Plan (City of Piedmont 2009a), Piedmont’s setting is shaped by its landscapes and its views and vistas, and protecting and enhancing the public realm is top priority. Piedmont’s visual image is largely defined by relatively large single-family residences constructed during the early Twentieth Century. This image is characterized by spacious front and rear yards, pedestrian-oriented streets with sidewalks, large street trees, and traditional single-family development scale.
Important local landmarks in the City of Piedmont include the Oakland Avenue Bridge, the Civic Center complex, the Exedra at Piedmont Park, Piedmont Community Hall, the trees along Oakland Avenue, and the City’s religious institutions and schools.
The Proposed Project is located in various residential streets and alleys within the existing sewer lines in the City of Piedmont. The pipeline is currently located all underground and will be replaced by using pipe bursting methods to install the new sewer lines. Open trench will be only utilized when installing two-way cleanouts and reconnecting laterals to the new sanitary sewer pipelines. The primary group that would have views of project work include local residents using the neighborhood street system for daily activities.
4.1.1.2 Regional Setting
State Scenic Highways
The California Scenic Highway Program protects and enhances the scenic beauty of California’s highways and adjacent corridors. The California Department of Transportation (Caltrans) can designate a highway as scenic based on how much natural beauty can be seen by users of the highway, the quality of the scenic landscape, and if development impacts the enjoyment of the view.
There are no designated or eligible State Scenic Highways in Piedmont. The closest designated State scenic highway is Interstate 580 (I-580) located 0.3 miles west of Piedmont, and the second closest eligible State Scenic highway is State Route 13 (SR 13), located 0.5 miles east of Piedmont.
General Plan
City of Piedmont Design and Preservation Element
Piedmont’s Design and Preservation Element addresses the city’s setting, appearance, and historic resources. Goals and policies related to scenic views and visual character include:
Attachment 2 Agenda Report Page 77
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-2 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Policy 27.3: View Preservation: Recognize and protect significant views in the city, particularly Piedmont’s characteristic views of the San Francisco and Oakland skylines, Lake Merritt and San Francisco Bay, the Bay and Golden Gate Bridges, and surrounding hills, canyons, and geological features. Discourage the obstruction of such views by upper level additions, tall structures, and devices such as communication towers. Similarly, tree planting should avoid species or locations that will lead to the obstruction of desirable views.
Policy 27.8: Utility Undergrounding: Support neighborhood efforts to underground utilities throughout Piedmont, with due consideration given to the level of community support and the financial impacts on the City and its residents. Underground utilities shall be required for any new subdivision.
4.1.2 Aesthetics (I) Environmental Checklist and Discussion Except as provided in Public Resources Code Section
21099, would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) have a substantial adverse effect on a scenic
vista?
Less Than Significant Impact.
A scenic vista is a viewpoint that provides a distant view of highly valued natural or manufactured landscape features for the benefit of the general public. Typical scenic vistas are locations where views of rivers, ocean, hillsides, and open space areas can be obtained as well as locations where valued urban landscape features can be viewed in the distance. As previously discussed, per the Design and Preservation Element of Piedmont’s General Plan, Piedmont’s setting is shaped by its landscapes and its views and vistas, and protecting and enhancing the public realm is top priority. Piedmont’s visual image is largely defined by relatively large single-family residences constructed during the early Twentieth Century.
This image is characterized by spacious front and rear yards, pedestrian-oriented streets with sidewalks, large street trees, and traditional single-family development scale.
The Proposed Project involves installation of Fusible HDPE pipe via pipe bursting in most cases. Pipe bursting will be used when there is sufficient room and access for the equipment, within Public ROW, and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels. In rare cases where pipe bursting equipment cannot be used, CIPP will be considered. Open trench will be only utilized when installing two-way cleanouts and reconnecting laterals to the new sanitary sewer pipelines.
Any impacts to a scenic vista would be temporary during construction activities. Once the Proposed Project is completed there will be no change in the visual character or quality of public views of the site.
Therefore, the Proposed Project would have a less than significant impact to visual scenic vistas. □ □ □
Attachment 2 Agenda Report Page 78
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-3 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Except as provided in Public Resources Code Section
21099, would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Substantially damage scenic resources, including,
but not limited to, trees, rock outcroppings, and
historic buildings within a state scenic highway?
Less Than Significant Impact.
According to Caltrans’ list of designated Scenic Highways and the City of Piedmont General Plan, the Proposed Project is not located near or within a state scenic highway and therefore would not damage designated scenic resources, including but not limited to trees, outcroppings, and historic buildings within a state scenic highway. Additionally, at this time, project work does not involve tree removal. Any impacts would be less than significant.
Except as provided in Public Resources Code Section
21099, would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) In non-urbanized areas, substantially degrade the
existing visual character or quality of public views
of the site and its surroundings? (Public views are
those that are experienced from publicly
accessible vantage point). If the Project is in an
urbanized area, would the Project conflict with
applicable zoning and other regulations
governing scenic quality?
Less Than Significant Impact.
The proposed Project is within an urbanized, residential community (see Figure 2-1). Project construction activities would introduce equipment, including light trucks, backhoes, winch, bursting head, generator, and other similar machinery into the viewshed of all viewer groups, creating temporary effects on views of and from the Project Site during construction. Once the Proposed Project is completed there will be no change in the visual character or quality of public views of the site and surroundings and the Project would not conflict with zoning and other regulations governing scenic quality. Any impacts would be less than significant.
Except as provided in Public Resources Code Section
21099, would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Would the Project create a new source of
substantial light or glare, which would adversely
affect day or nighttime views in the area?
□ □ □
□ □ □
□ □ □
Attachment 2 Agenda Report Page 79
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-4 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 No Impact.
The Proposed Project involves replacing approximately 17,626 linear feet of sanitary sewer collection pipe.
No new lighting is proposed as part of the Project and the Project would not create a new source of substantial light or glare. There would be no impact and no mitigation is required.
4.1.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.2 Agriculture and Forestry Resources
4.2.1 Environmental Setting
The City of Piedmont lacks agricultural and forest lands. Neither agriculture nor forestry lands are a General Plan designation, zoning classification, or use within the City of Piedmont (City of Piedmont 2009a).
According to the California Department of Conservation (DOC) online Important Farmland Finder Map (2023a), the Proposed Project Site does not contain Prime Farmland, Unique Farmland, or Farmland of Statewide Importance, nor is the site zoned for agriculture or forestry use or is under Williamson Act contract (DOC 2023b). The California Important Farmland Finder Map identifies the site as primarily Urban and Built-Up Land.
4.2.2 Agriculture and Forestry Resources (II) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of
the California Resources Agency, to nonagricultural use? No Impact.
As discussed above, the California Important Farmland Finder Map identifies the Project Site as Urban and Built-Up Land. Thus, the Proposed Project would not convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use. There would be no impact and no mitigation is required.
□ □ □
Attachment 2 Agenda Report Page 80
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-5 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Conflict with existing zoning for agricultural use,
or a Williamson Act contract?
No Impact.
The Proposed Project Site and surrounding areas are not zoned for agricultural use and no nearby parcels are under Williamson Act contracts (DOC 2023b). The Proposed Project would not conflict with existing zoning for agricultural uses or a Williamson Act contract. Therefore, no impact would occur, and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in Public
Resources Code Section 12220(g)), timberland (as
defined by Public Resources Code Section 4526),
or timberland zoned Timberland Production (as
defined by Government Code Section 51104(g))?
No Impact.
As discussed above, the Proposed Project is within public ROW, and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels. The City Zoning Ordinance does not identify the Project Site as forest land (as defined in PRC Section 12220(g)), timberland (as defined by PRC Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g)). Thus, project implementation would not conflict with or cause the rezoning of any of the above zoning designations and there would be no impact and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Result in the loss of forest land or conversion of
forest land to non-forest use?
No Impact.
See discussion under item c). No impact would occur and no mitigation is required. □ □ □
□ □ □
□ □ □
Attachment 2 Agenda Report Page 81
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-6 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
e) Involve other changes in the existing
environment, which, due to their location or
nature, could result in conversion of Farmland to
non-agricultural use or conversion of forest land
to non-forest use?
No Impact.
See discussion under item a) and c), the Proposed Project would not result in conversion of Farmland to non-agricultural use or conversion of forest land to non-forest. No impact would occur and no mitigation measures are required.
4.2.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.3 Air Quality
The following section is based on information included in The City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project – Air Quality and Greenhouse Gas Emissions Assessment Memorandum completed by ECORP Consulting, Inc. (2024a). This document is included as Appendix A of this Initial Study.
4.3.1 Environmental Setting
The Project Area is located in the City of Piedmont in Alameda County. The California Air Resources Board (CARB) divides the state into air basins that share similar meteorological and topographical features. The Proposed Project is located in the San Francisco Bay Area Air Basin (SFBAAB). The SFBAAB is approximately 5,600 square miles in area and consists of nine counties that surround the San Francisco Bay, including all of Alameda, Contra Costa, Marin, San Francisco, San Mateo, Santa Clara, and Napa Counties; the southwestern portion of Solano County; and the southern portion of Sonoma County.
Both the U.S. Environmental Protection Agency (USEPA) and CARB have established ambient air quality standards for common pollutants. These ambient air quality standards are levels of contaminants representing safe levels that avoid specific adverse health effects associated with each pollutant. The ambient air quality standards cover what are called criteria pollutants because the health and other effects of each pollutant are described in criteria documents. The six criteria pollutants are ozone (O3), Carbon Monoxide (CO), Particulate Matter (PM), Oxides of Nitrogen (NOx), sulfur dioxide (SO2), and lead. Areas that meet ambient air quality standards are classified as attainment areas, while areas that do not meet these standards are classified as nonattainment areas.
□ □ □
Attachment 2 Agenda Report Page 82
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-7 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.3.2 Ambient Air Quality
Ambient air quality in the Project Area can be inferred from ambient air quality measurements conducted at nearby air quality monitoring stations. CARB maintains more than 60 monitoring stations throughout California. O3, coarse particulate matter (PM10), and fine particulate matter (PM2.5) are the pollutant species most potently affecting the Project region. As described in detail below, the region is designated as a nonattainment area for the federal O3 and PM2.5 standards and is also a nonattainment area for the state standards for O3, PM2.5, and PM10 (CARB 2022). The Oakland – West air quality monitoring station (1100 21st Street) located approximately 1.88 miles southwest of the Project Area monitors ambient concentrations of O3, and PM2.5. The Concord – 2975 Treat Boulevard air quality monitoring station, located approximately 14.5 miles northeast of the Project Area, monitors ambient concentrations of PM10.
Ambient emission concentrations will vary due to localized variations in emission sources and climate and should be considered “generally” representative of ambient concentrations in the Project Area.
Table 4.3-1 summarizes the published data concerning O3, PM10, and PM2.5 since 2020 for each year that the monitoring data is provided.
Table 4.3-1. Summary of Ambient Air Quality Data
Pollutant Standards 2020 2021 2022
O3 (Oakland – West Monitoring Station)
Max 1-hour concentration (ppm) 0.084 0.067 0.054
Max 8-hour concentration (ppm) (state/federal) 0.056/0.056 0.047/0.046 0.041/0.041 Number of days above 1-hour standard
(state/federal)
0/0 0/0 0/0
Number of days above 8-hour standard
(state/federal)
0/0 0/0 0/0
PM10 (Concord – 2975 Treat Boulevard Monitoring Station) Max 24-hour concentration (µg/m3) (state/federal) 167.0/165.4 26.0/25.0 35.0/25.0 Number of days above 24-hour standard
(state/federal)
*/11.5 0/0 0/0
PM2.5 (Oakland – West Monitoring Station)
Max 24-hour concentration (µg/m3) (state/federal) 159.7/159.7 25.4/25.4 33.8/33.8 Number of days above federal 24-hour standard 8.5 0 0
Note: μg/m3 = micrograms per cubic meter; ppm = parts per million * = Insufficient data available
Source: California Air Resources Board (CARB) 2023
The USEPA and CARB designate air basins or portions of air basins and counties as being in “attainment” or “nonattainment” for each of the criteria pollutants. Areas that do not meet the standards are classified as nonattainment areas. Acceptable exceedances of the maximum value vary for the National Ambient Air Attachment 2 Agenda Report Page 83
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-8 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Quality Standards (NAAQS) from 4th highest concentration for the 8-hour O3 standard to 99th percentile to the SO2 standard. The NAAQS for O3, PM10, and PM2.5 are based on statistical calculations over one- to three-year periods, depending on the pollutant. The California Ambient Air Quality Standards (CAAQS) are not to be exceeded during a three-year period. The attainment status for the Alameda County portion of the SFBAAB, which encompasses the Project Area, is included in Table 4.3-2.
Table 4.3-2. Attainment Status of Criteria Pollutants in the Alameda County Portion of the SFBAAB
Pollutant State Designation Federal Designation
O3 Nonattainment Nonattainment
PM10 Nonattainment Unclassified
PM2.5 Nonattainment Nonattainment
CO Attainment Unclassified/Attainment
NO2 Attainment Unclassified/Attainment
SO2 Attainment Unclassified/Attainment
Lead Attainment Unclassified/Attainment
Note: CO = Carbon Monoxide; NO2 = Nitrogen Dioxide; O3 = Ozone; PM2.5 = Fine Particulate Matter; PM10 = Coarse Particulate Matter; SFBAAB = San Francisco Bay Area Air Basin; SO2 = Sulfur dioxide Source: California Air Resources Board (CARB) 2022
The determination of whether an area meets the state and federal standards is based on air quality monitoring data. Some areas are unclassified, which means there is insufficient monitoring data for determining attainment or nonattainment. Unclassified areas are typically treated as being in attainment.
Because the attainment/nonattainment designation is pollutant-specific, an area may be classified as nonattainment for one pollutant and attainment for another. Similarly, because the state and federal standards differ, an area could be classified as attainment for the federal standards of a pollutant and as nonattainment for the state standards of the same pollutant. The portion of Alameda County encompassing the Project Area is designated as a nonattainment area for the state standards for O3, PM2.5, and PM10 and is also a nonattainment area for the state standards for O3 and PM2.5 (CARB 2022). It is noted that the Project would not be a source of lead emissions.
4.3.3 Regulatory Setting
4.3.3.1 Bay Area Air Quality Management District
The air quality regulating authority in Alameda County is the Bay Area Air Quality Management District (BAAQMD). The BAAQMD responsibilities include preparing plans for the attainment of ambient air quality standards, adopting and enforcing air pollution rules, issuing permits for and inspecting stationary air pollution sources, responding to citizen complaints, monitoring ambient air quality and meteorological conditions, and implementing state and federal programs and regulations. The BAAQMD has also Attachment 2 Agenda Report Page 84
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-9 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 adopted various rules and regulations that are designed to reduce and control pollutant emissions from a project’s construction and operational activities. The following provisions are applicable to the Proposed Project are summarized as follows:
Regulation 2, Rule 1, General Permit Requirements: Includes criteria for issuance or denial of permits, exemptions, appeals against decisions of the Air Pollution Control Officer and BAAQMD actions on applications.
Regulation 2, Rule 2, New Source Review: Applies to new or modified sources and contains requirements for Best Available Control Technology and emission offsets. Rule 2 implements federal New Source Review and Prevention of Significant Deterioration requirements. Regulation 6, Rule 1, General Requirements: Limits the quantity of particulate matter in the atmosphere by controlling emission rates, concentration, visible emissions and opacity. Regulation 6, Rule 6, Prohibition of Trackout: Controls trackout of solid material onto public paved roads from three types of sites: large bulk material sites, large construction sites, and large disturbed area sites. Under this regulation, the owners and operators of a construction site are required to clean up trackout on public roadways within four hours of identification and at the conclusion of each workday. The rule also includes requirements regarding the emission of fugitive dust during cleanup of trackout, and requirements for monitoring and reporting trackout at regulated sites.
Regulation 7, Odorous Substances: Regulation 7 places general limitations on odorous substances and specific emission limitations on certain odorous compounds. A person (or facility) must meet all limitations of this regulation but meeting such limitations shall not exempt such person from any other requirements of BAAQMD, state, or national law. The limitations of this regulation shall not be applicable until BAAQMD receives odor complaints from ten or more complainants within a 90‐day period, alleging that a person has caused odors perceived at or beyond the property line of such person and deemed to be objectionable by the complainants in the normal course of their work, travel, or residence. When the limits of this regulation become effective, as a result of citizen complaints described above, the limits shall remain effective until such time as no citizen complaints have been received by BAAQMD for one year. The limits of this Regulation shall become applicable again if BAAQMD receives odor complaints from five or more complainants within a 90‐day period. BAAQMD staff investigate and track all odor complaints it receives and make attempts to visit the site and identify the source of the objectionable odor and assist the owner or facility in finding a way to reduce the odor.
4.3.3.2 United States Environmental Protection Agency
General Conformity ensures that the actions taken by federal agencies do not interfere with a state’s plans to attain and maintain national standards for air quality. Established under the Clean Air Act (section 176(c)(4)), the General Conformity rule plays an important role in helping states improve air quality in those areas that do not meet the NAAQS. Under the General Conformity rule, federal agencies must work with state and local governments in a nonattainment or maintenance area to ensure that federal actions Attachment 2 Agenda Report Page 85
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-10 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 conform to the air quality plans established in the applicable state or tribal implementation plan. The overall purpose of the General Conformity rule is to ensure that:
Federal activities do not cause or contribute to new violations of NAAQS; Actions do not worsen existing violations of the NAAQS; and Attainment of the NAAQS is not delayed.
The General Conformity process begins with an “applicability analysis,” whereby it must be determined how and to what degree the Conformity Rules apply. According to USEPA’s General Conformity Guidance:
Questions and Answers (1994), before any approval is given for a Federal Action to go forward, the federal agency must apply the applicability requirements found at 40 Code of Federal Regulations (CFR) § 93.153 to the Federal Action and/or determine on a pollutant-by-pollutant basis, whether a determination of General Conformity is required. During the applicability analysis, the federal agency determines the following:
Whether the action will occur in a nonattainment or maintenance area; Whether one or more of the specific exemptions apply to the action; Whether the federal agency has included the action on its list of presumed-to-conform actions;
Whether the total direct and indirect emissions are below or above the de minimis levels; and/or
Where a facility has an emissions budget approved by the State or Tribe as part of the State Implementation Plan or Tribal Implementation Plan, the federal agency determines that the emissions from the proposed action are within the budget.
The General Conformity Rule allows for exemptions for emissions that are not reasonably foreseeable, will not result in an increase in emissions, are below de minimis limits, are the result of emergency actions, are included in stationary source air permits, are for routine maintenance and repair of existing structures, or are included in a transportation conformity determination undertaken by Federal Highway Administration or Federal Transit Administration (40 CFR 93.153(c)).
4.3.3.3 Thresholds of Significance
Bay Area Air Quality Management District
The significance criteria established by the applicable air quality management or air pollution control district (BAAQMD) may be relied upon to make the impact determination shown below in the Checklist Questions. The BAAQMD has published a guidance document for the preparation of the air quality portions of environmental documents that include thresholds of significance to be used in evaluating land use proposals. Thresholds of significance are based on a source’s projected impacts and are a basis from which to apply mitigation measures. BAAQMD’s CEQA thresholds have also been used to determine air quality impacts in this analysis. If a project’s individual emissions exceed its identified significance Attachment 2 Agenda Report Page 86
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-11 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 thresholds, the Project would be cumulatively considerable. Projects that do not exceed significance thresholds would not be considered cumulatively considerable. The BAAQMD’s established thresholds of significance for air quality for construction of land use development projects are shown in Table 4.3-3.
Table 4.3-3. BAAQMD Criteria Air Pollutants Significance Thresholds Construction Related
Air Pollutant Average Daily Emissions (pounds per day)
ROG 54
NOx 54
PM10 (exhaust) 82
PM2.5 (exhaust) 54
PM10 (fugitive dust) Best Management Practices
PM2.5 (fugitive dust) Best Management Practices
Local CO None
Note: BAAQMD = Bay Area Air Quality Management District; CO = Carbon Monoxide; NOx = Nitric Oxide; PM2.5 = Fine Particulate Matter; PM10 = Coarse Particulate Matter; ROG = Reactive Organic Gas Source: Bay Area Air Quality Management District (BAAQMD) 2023 By its very nature, air pollution is largely a cumulative impact. No single project is sufficient in size, by itself, to result in nonattainment of ambient air quality standards. Instead, a project’s individual emissions contribute to existing cumulatively significant adverse air quality impacts. If a project’s individual emissions exceed its identified significance thresholds, the project would be cumulatively considerable.
Projects that do not exceed significance thresholds would not be considered cumulatively considerable.
United States Environmental Protection Agency Conformity Determination A conformity determination would be required if the annual emissions of non-attainment pollutants generated by the Project were to exceed the General Conformity de minimis thresholds. The de minimis limits represent an emissions level that the USEPA has determined will have only de minimis impacts to the air quality of an area and are thus exempted from the General Conformity Rule. If the overall predicted increase in emissions of a criteria pollutant due to a federal action in a nonattainment area exceeds the de minimis limits as shown in Table 4.3-4, a conformity determination is required.
Table 4.3-4. Federal General Conformity De Minimis Emissions Levels in Alameda County Pollutant Attainment Status Classification
USEPA General
Conformity Threshold
(tons/year)
Ozone (VOCs or NOx) Nonattainment Marginal 50
PM10 Unclassified N/A 100
PM2.5 Nonattainment Moderate 100
CO Unclassified/Attainment Maintenance 100
Attachment 2 Agenda Report Page 87
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-12 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Table 4.3-4. Federal General Conformity De Minimis Emissions Levels in Alameda County Pollutant Attainment Status Classification
USEPA General
Conformity Threshold
(tons/year)
NO2 Unclassified/Attainment N/A 100
SO2 Unclassified/Attainment N/A 100
Lead Unclassified/Attainment N/A 25
Note: CO = Carbon Monoxide; NO2 = Nitrogen Dioxide; PM2.5 = Fine Particulate Matter; PM10 = Coarse Particulate Matter; SO2 = Sulfur dioxide; VOC = Volatile Organic Compound Source: U.S. Environmental Protection Agency (USEPA) 2023
4.3.4 Air Quality (III) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Conflict with or obstruct implementation of the
applicable air quality plan?
Less Than Significant Impact With Mitigation Incorporated.
As part of its enforcement responsibilities, the USEPA requires each state with nonattainment areas to prepare and submit a State Implementation Plan (SIP) that demonstrates the means to attain the federal standards. The SIP must integrate federal, state, and local plan components and regulations to identify specific measures to reduce pollution in nonattainment areas, using a combination of performance standards and market-based programs. Similarly, under state law, the California Clean Air Act requires an air quality attainment plan to be prepared for areas designated as nonattainment with regard to the NAAQS and CAAQS. Air quality attainment plans outline emissions limits and control measures to achieve and maintain these standards by the earliest practical date.
As previously mentioned, the Project Area is located within the SFBAAB, which is under the jurisdiction of the BAAQMD. The agency’s primary responsibility is ensuring that the NAAQS and CAAQS are attained and maintained in the Bay Area. The BAAQMD attains and maintains air quality conditions in Alameda County through a comprehensive program of planning, regulation, enforcement, technical innovation, and promotion of the understanding of air quality issues. The most recently adopted air quality plan is the BAAQMD’s 2017 Clean Air Plan, the primary goals of which are to protect public health and the climate.
The 2017 Clean Air Plan includes a wide range of control measures and actions to reduce combustionrelated activities, decrease combustion of fossil fuels, improve energy efficiency, and reduce emissions of potent greenhouse gases. Several measures address the reduction of multiple pollutants such as O3 precursors, PM, air toxics, and Greenhouse Gas (GHG) emissions.
Determination of whether a project supports the goals in the 2017 Clean Air Plan is achieved by a comparison of Project-estimated emissions with BAAQMD thresholds of significance. If project emissions □ □ □
Attachment 2 Agenda Report Page 88
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-13 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 would not exceed the thresholds of significance after the application of all feasible mitigation measures, the project is consistent with the goals of the 2017 Clean Air Plan. As shown below in Table 4.3-5 and Table 4.3-6, with the implementation of mitigation measure AQ-1, emissions generated during Project construction would not exceed the BAAQMD’s or the USEPA’s significance thresholds. Therefore, the Project would not conflict with or obstruct reduction measures presented in the 2017 Clean Air Plan or any NAAQS required SIP.
For these reasons, the Project would have a less than significant impact Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Result in a cumulatively considerable net increase
of any criteria pollutant for which the Project
region is non-attainment under an applicable
federal or state ambient air quality standard?
Less Than Significant Impact With Mitigation Incorporated.
By its very nature, air pollution is largely a cumulative impact. No single project is sufficient in size, by itself, to result in nonattainment of ambient air quality standards. Instead, a project’s individual emissions contribute to existing cumulatively significant adverse air quality impacts. If a project’s individual emissions exceed its identified significance thresholds, the project would be cumulatively considerable.
Projects that do not exceed significance thresholds would not be considered cumulative considerable.
Air quality impacts were assessed in accordance with methodologies recommended by the BAAQMD.
Where criteria air pollutant quantification was required, emissions were modeled using the California Emissions Estimator Model (CalEEMod), version 2022.1.1. CalEEMod is a statewide land use emissions computer model designed to quantify potential criteria pollutant emissions associated with both construction and operations from a variety of land use projects. Project construction-generated air pollutant emissions were calculated using CalEEMod model defaults for Alameda County. The Project would replace approximately 17,626 linear feet of sanitary sewer collection pipe. The existing sewer lines have exceeded their useful life and allow for excessive infiltration/inflow of groundwater in certain areas of the collection system. The Proposed Project would minimize the number and impact of sanitary sewer overflows as well as take a proactive approach in addressing infiltration/inflow into the sewer system.
4.3.4.1 Construction-Generated Emissions
Construction-generated emissions are temporary and short-term but have the potential to represent a significant air quality impact. The basic sources of short-term emissions that will be generated through Project construction will be from the operation of construction vehicles. The creation of fugitive dust during excavation and grading, construction vehicle traffic, and wind blowing over exposed soils would generate exhaust emissions and fugitive PM emissions that affect local air quality at various times during construction. Effects would be variable depending on the weather, soil conditions, the amount of activity □ □ □
Attachment 2 Agenda Report Page 89
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-14 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 taking place, and the nature of dust control efforts. The dry climate of the area during the summer months creates a high potential for dust generation. Construction activities would be subject to BAAQMD Regulation 6, Rule 1 (General Requirements) and Regulation 6, Rule 6 (Prohibition of Trackout) which require dust generating operations to limit particulate matter emissions. Rule 6-1 prohibits fugitive emissions onsite and Air District enforcement staff are trained to document visible emissions and fugitive dust using either the opacity or the Ringelmann test methods. For construction sites, the Rule does not prescribe mitigation measures, however operators are expected to utilize standard construction management practices to comply with the fugitive dust emissions prohibition. Rule 6-6 prohibits trackout.
For construction sites, the Rule does not prescribe mitigation measures, however construction operators are expected to use common operational measures and suppression techniques (i.e., trackout control devices) to minimize trackout.
Construction-generated emissions associated with the Proposed Project were calculated using the CARBapproved CalEEMod computer program, which is designed to model emissions for land use development projects, based on typical construction requirements. See Appendix A for more information regarding the construction assumptions, including construction equipment and duration, used in this analysis.
Predicted maximum daily emissions attributable to Project construction are summarized in Table 4.3-5.
Such emissions are short-term and of temporary duration, lasting only as long as Project construction activities occur, but would be considered a significant air quality impact if the volume of pollutants generated exceeds the BAAQMD’s thresholds of significance.
Table 4.3-5. Construction-Related Criteria Air Pollutant Emissions Description
Pollutant
(pounds per day)
ROG NOX
PM10
(exhaust)
PM2.5
(exhaust)
PM10
(fugitive
dust)
PM10
(fugitive
dust)
Construction
Year One 4.09 28.9 1.32 1.22 0.50 0.12
BAAQMD
Significant Impact
Threshold
54 pounds/day
54 pounds/day
82 pounds/day
54 pounds/day
Basic
Construction
Best
Management
Practices
Basic
Construction
Best
Management
Practices
Exceed BAAQMD
Threshold? No No No No No No
Notes: Emissions estimates account for the quantifiable dust-reduction measures that are also approved methods within the BAAQMD Basic Construction Mitigation Measures, such as watering unpaved portions of the construction site twice daily and limiting off-road equipment to slower speeds.
BAAQMD = Bay Area Air Quality Management District; NOx = Nitric Oxide; PM2.5 = Fine Particulate Matter; PM10 = Coarse Particulate Matter; ROG = Reactive Organic Gas Source: California Emissions Estimator Model (CalEEMod) version 2022.1.1. Refer to Appendix A for Model Data Outputs.
Attachment 2 Agenda Report Page 90
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-15 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 As shown in Table 4.3-5, emissions generated during Project construction would not exceed the BAAQMD’s thresholds of significance. It is noted that the BAAQMD thresholds for fugitive dust emissions are not numeric, but instead rely on the implementation of BAAQMD Basic Construction Best Management Practices to be considered less than significant. Thus, the Proposed Project would need to incorporate Basic Construction Best Management Practices in order to be considered less than significant.
With implementation of Mitigation Measure AQ-1, criteria pollutant emissions generated during Project construction would not result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is nonattainment under an applicable federal or state ambient air quality standard, and no health effects from Project criteria pollutants would occur. As such, the Project would have a less than significant impact.
4.3.4.2 USEPA Conformity Determination
As previously described, the Proposed Project is located in the Alameda County region, which is designated as a nonattainment area for the federal O3 and PM2.5 standards. Emissions generated during Project implementation would be short term and of temporary duration, lasting only as long as construction activities occur, but would be considered a significant air quality impact if the volume of pollutants generated exceeds the Conformity Determination thresholds. Predicted maximum annual construction-generated emissions for the Proposed Project are summarized in Table 4.3-6 and compared against the USEPA Conformity Determination thresholds.
Table 4.3-6. Construction-Related Emissions (USEPA Conformity Determination Analysis) Construction Year
Pollutant (tons per year)
VOC (ROG) NOX CO PM10 PM2.5
Construction Year One 0.11 0.75 0.92 0.05 0.03
USEPA Conformity Determination
Thresholds (40 CFR 93.153) 100 100 100 100 100
Exceed USEPA Conformity
Determination Thresholds? No No No No No
Note: CFR = Code of Federal Regulations; CO = Carbon Monoxide; NOx = Nitric Oxide; PM2.5 = Fine Particulate Matter; PM10 = Coarse Particulate Matter; ROG = Reactive Organic Gas; USEPA = U.S. Environmental Protection Agency; VOC = Volatile Organic Compound
Source: California Emissions Estimator Model (CalEEMod) version 2022.1.1. Refer to Appendix A for Model Data Outputs.
As shown in Table 4.3-6, emissions from construction of the Proposed Project would not exceed the USEPA Conformity Determination thresholds for the region.
Attachment 2 Agenda Report Page 91
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-16 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.3.4.3 Project Operational Emissions
The Proposed Project includes the rehabilitation of sanitary sewer mains and their associated lower sewer laterals to minimize the number and impact of sanitary sewer overflows. The amount of effluent pumped Would not increase beyond existing conditions. Therefore, there are no new operational emissions associated with the Proposed Project.
Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Expose sensitive receptors to substantial
pollutant concentrations?
Less Than Significant Impact.
As previously described, sensitive receptors are defined as facilities or land uses that include members of the population that are particularly sensitive to the effects of air pollutants, such as children, the elderly, and people with illnesses. Examples of these sensitive receptors are residences, schools, hospitals, and daycare centers. CARB has identified the following groups of individuals as the most likely to be affected by air pollution: the elderly over 65, children under 14, athletes, and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis. The nearest noise sensitive receptors to the Project Area are single-family residences, which are located at various distances, with the closest residence approximately 30 feet distant.
4.3.4.4 Construction-Generated Air Contaminants
Construction-related activities would result in temporary, short-term Proposed Project-generated emissions of diesel particulate matter (DPM), ROG, NOx, CO, and PM10 from the exhaust of off-road, heavy-duty diesel equipment (e.g., clearing, grading); soil hauling truck traffic; paving; and other miscellaneous activities. The portion of the SFBAAB which encompasses the Project Area is designated as a designated as a nonattainment area for the federal O3 and PM2.5 and is also a nonattainment area for the state standards for O3, PM2.5, and PM10 (CARB 2022). Thus, existing O3, PM10, and PM2.5 levels in the SFBAAB are at unhealthy levels during certain periods. However, as shown in Table 4.3-5 and Table 4.3-6, the Project would not exceed the BAAQMD or USEPA significance thresholds for emissions.
The health effects associated with O3 are generally associated with reduced lung function. O3 is not emitted directly into the air but is formed through complex chemical reactions between precursor emissions of ROG and NOx in the presence of sunlight. The reactivity of O3 causes health problems because it damages lung tissue, reduces lung function and sensitizes the lungs to other irritants. Scientific evidence indicates that ambient levels of O3 not only affect people with impaired respiratory systems, such as asthmatics, but healthy adults and children as well. Exposure to O3 for several hours at relatively low concentrations has been found to significantly reduce lung function and induce respiratory inflammation in normal, healthy people during exercise. This decrease in lung function generally is accompanied by symptoms including chest pain, coughing, sneezing and pulmonary congestion. □ □ □
Attachment 2 Agenda Report Page 92
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-17 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Studies show associations between short-term O3 exposure and non-accidental mortality, including deaths from respiratory issues. Studies also suggest long-term exposure to O3 may increase the risk of respiratory-related deaths. The concentration of O3 at which health effects are observed depends on an individual’s sensitivity, level of exertion (i.e., breathing rate), and duration of exposure. Studies show large individual differences in the intensity of symptomatic responses, with one study finding no symptoms to the least responsive individual after a 2-hour exposure to 400 parts per billion of O3 and a 50 percent decrement in forced airway volume in the most responsive individual. Although the results vary, evidence suggests that sensitive populations (e.g., asthmatics) may be affected on days when the 8-hour maximum O3 concentration reaches 80 parts per billion. Because the Project would not involve construction activities that would result in O3 precursor emissions (ROG or NOx) in excess of the BAAQMD thresholds, which are set to be protective of human health and account for cumulative emissions in the SFBAAB, the Project is not anticipated to substantially contribute to regional O3 concentrations and the associated health impacts.
CO tends to be a localized impact associated with congested intersections. In terms of adverse health effects, CO competes with oxygen, often replacing it in the blood, reducing the blood’s ability to transport oxygen to vital organs. The results of excess CO exposure can include dizziness, fatigue, and impairment of central nervous system functions. The Project would not involve construction activities that would result in CO emissions in excess of the BAAQMD thresholds, which are set to be protective of human health and account for cumulative emissions in the SFBAAB. Thus, the Project’s CO emissions would not contribute to the health effects associated with this pollutant.
Particulate matter (PM10 and PM2.5) contains microscopic solids or liquid droplets that are so small that they can get deep into the lungs and cause serious health problems. Particulate matter exposure has been linked to a variety of problems, including premature death in people with heart or lung disease, nonfatal heart attacks, irregular heartbeat, aggravated asthma, decreased lung function, and increased respiratory symptoms such as irritation of the airways, coughing, or difficulty breathing. For construction activity, DPM is the primary toxic air contaminant of concern. PM10 exhaust is considered a surrogate for DPM as all diesel exhaust is considered to be DPM and it contains PM2.5 exhaust as a subset. As with O3 and NOx, the Project would not generate emissions of PM10 or PM2.5 that would exceed the BAAQMD’s thresholds.
The increases of these pollutants generated by the Proposed Project would not on their own generate an increase in the number of days exceeding the NAAQS or CAAQS standards. Therefore, PM10 and PM2.5 emissions, when combined with the existing PM emitted regionally, would have minimal health effect on people located in the immediate vicinity of the Project Site. Additionally, the Project’s PM10 and PM2.5 emissions are not expected to cause any increase in related regional health effects from these pollutants.
In summary, Project construction would not result in a potentially significant contribution to regional concentrations of nonattainment pollutants and would not result in a significant contribution to the adverse health impacts associated with those pollutants. Furthermore, the Project has been evaluated against the USEPA Conformity Determination thresholds. Thus, the fact that onsite Project construction emissions would be generated at rates below the thresholds for NOx, CO, PM10, and PM2.5 demonstrates that the Project would not adversely impact vicinity sensitive receptors. A less than significant impact would occur.
Attachment 2 Agenda Report Page 93
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-18 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Would the Project:
Potentially
Significant
Impact
Less than
Significant
With
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Result in other emissions (such as those leading
to odors) adversely affecting a substantial
number of people?
Less Than Significant Impact.
Typically, odors are regarded as an annoyance rather than a health hazard. However, manifestations of a person’s reaction to foul odors can range from psychological (e.g., irritation, anger, or anxiety) to physiological (e.g., circulatory and respiratory effects, nausea, vomiting, and headache).
With respect to odors, the human nose is the sole sensing device. The ability to detect odors varies considerably among the population and overall is quite subjective. Some individuals have the ability to smell minute quantities of specific substances; others may not have the same sensitivity but may have sensitivities to odors of other substances. In addition, people may have different reactions to the same odor; in fact, an odor that is offensive to one person (e.g., from a fast-food restaurant) may be perfectly acceptable to another. It is also important to note that an unfamiliar odor is more easily detected and is more likely to cause complaints than a familiar one. This is because of the phenomenon known as odor fatigue, in which a person can become desensitized to almost any odor and recognition only occurs with an alteration in the intensity.
Quality and intensity are two properties present in any odor. The quality of an odor indicates the nature of the smell experience. For instance, if a person describes an odor as flowery or sweet, the person is describing the quality of the odor. Intensity refers to the strength of the odor. For example, a person may use the word “strong” to describe the intensity of an odor. Odor intensity depends on the odorant concentration in the air. When an odorous sample is progressively diluted, the odorant concentration decreases. As this occurs, the odor intensity weakens and eventually becomes so low that the detection or recognition of the odor is quite difficult. At some point during dilution, the concentration of the odorant reaches a detection threshold. An odorant concentration below the detection threshold means that the concentration in the air is not detectable by the average human.
During construction, the Proposed Project presents the potential for generation of objectionable odors in the form of diesel exhaust in the immediate vicinity of the site. However, these emissions are short-term in nature and will rapidly dissipate and be diluted by the atmosphere downwind of the emission sources.
Additionally, odors would be localized and generally confined to the construction area. Therefore, construction odors would not adversely affect a substantial number of people to odor emissions.
Land uses commonly considered to be potential sources of obnoxious odorous emissions include agriculture (farming and livestock), wastewater treatment plants, food processing plants, chemical plants, composting facilities, refineries, landfills, dairies, and fiberglass molding. The Proposed Project does not include any uses identified as being associated with odors. The replacement sanitary sewer collection pipes would not result in the introduction of any new processes that are considered to have a high odor- □ □ □
Attachment 2 Agenda Report Page 94
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-19 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 generation potential and would not result in substantial changes to the overall flow rates or treatment processes that are of primary concern with regard to odor generation (i.e., sludge handling or drying practices). Therefore, the Proposed Project would have a less than significant impact when it comes to odors.
4.3.5 Mitigation Measures
AQ-1: Adhere to Bay Area Air Quality Management District Basic Construction Best Management Practices. The Project shall implement the following Bay Area Air Quality Management Construction Best Management Practices:
All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. All haul trucks transporting soil, sand, or other loose material off-site shall be covered.
All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.
All vehicle speeds on unpaved roads shall be limited to 15 mph. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.
All trucks and equipment, including their tires, shall be washed off prior to leaving the site.
Unpaved roads providing access to sites located 100 feet or further from a paved road shall be treated with a 6- to 12-inch layer of compacted layer of wood chips, mulch, or gravel.
Publicly visible signs shall be posted with the telephone number and name of the person to contact at the lead agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s General Air Pollution Complaints number shall also be visible to ensure compliance with applicable regulations.
4.4 Biological Resources
This section is based on the analysis and recommendations presented in the Biological Resources Assessment prepared for the Proposed Project (ECORP 2024b, Appendix B).
4.4.1 Environmental Setting
The Biological Study Area (BSA) includes all areas where Project-related activities may result in impacts to sensitive biological resources. The BSA includes the approximately 4.22-acre Project Area and 11.78-acre Staging Area. The BSA corresponds to the Unsectioned San Antonia (V. and D. Peralta) Land Grant (Mount Attachment 2 Agenda Report Page 95
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-20 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Diablo Base and Meridian) of the “Oakland East, California” 7.5-minute quadrangle (U.S. Geological Survey 1997; Figure 1). The approximate center of the BSA is located at latitude 37.828462° and longitude 122.231645° (North American Datum 1983) within the San Francisco Bay watershed (Hydrological Unit Code 18050004; Natural Resources Conservation Service [NRCS] et al. 2016).
The BSA is located in an urban setting, including within existing paved streets, sidewalks, residential yards, and the City’s corporation yard at Red Rock Road, which is a paved and developed facility. The City corporation yard portion of the BSA is situated at an elevation of approximately 400 feet above mean sea level (amsl) and the streets portion of the BSA range from approximately 100 feet to 400 feet amsl in the San Francisco Bay Area subregion, Central Western California region of the California floristic province.
The average winter temperature is 51.7 degrees Fahrenheit (˚F) and the average summer temperature is
63.7˚F; the average annual precipitation is approximately 26.12 inches at the Berkeley, CA station, which is approximately 3 miles from the BSA.
There are no native or natural vegetation communities located within the BSA. The BSA is located on heavily sloped terrain. The streets are narrow and paved with asphalt with developed sidewalks, curbs, and gutters. Landscaping trees and shrubs are scattered along the sidewalks and residential yards. Trees and shrubs are made up of native and nonnative cultivars.
Land uses surrounding the BSA include urban development.
4.4.1.1 Soils
According to the Web Soil Survey (ECORP 2022b), four soil units have been mapped within the Study Area (Figure 4.4-1):
126– Maymen loam, 30 to 75 percent slopes
127 – Maymen-Los Gatos complex, 30 to 75 percent slopes 151 – Urban land-tierra complex, 5 to 15 percent slopes 159 – Xerorthents-Millsholm complex, 30 to 50 percent slopes
4.4.1.2 Vegetation Communities and Land Cover Types
The BSA is completely developed and consists of paved streets, sidewalks, curbs/gutters, and landscaped residential yards. There are no natural or native vegetation communities present.
4.4.1.3 Aquatic Resources
The field reconnaissance conducted on February 15, 2024 confirmed that there are no aquatic resources within the BSA. Review of the National Wetland Inventory (NWI) showed that there are no previously mapped aquatic features within the Proposed Project Area.
Attachment 2 Agenda Report Page 96
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-21 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.4.1.4 Wildlife
The developed setting of the BSA provides nesting and foraging habitat for a few common resident and migratory birds that are protected under the Migratory Bird Treaty Act (MBTA), such as Anna’s hummingbird (Calypte anna), American crow (Corvus brachyrhynchos), American robin (Turdus migratorius), and house finch (Haemorhous mexicanus), among others. Other wildlife species acclimated to the urban setting in the BSA include Virginia opossum (Didelphis virginiana), eastern fox squirrel (Sciurus niger), striped skunk (Mephitis mephitis), and common racoon (Procyon lotor).
Special-Status Species
No special-status species area expected to occur in the Project Area, due to absence of natural vegetation communities, the developed setting, and disturbances caused by the presence of vehicle traffic, pedestrians, and domestic dogs and cats. More information can be found within the Biological Resources Assessment in Appendix B.
4.4.1.5 Critical Habitat or Essential Fish Habitat
There is no designated Critical Habitat within the Project Area. Based on the literature review, the BSA may contain anadromous fish critical habitat for California Central Coast Distinct Population Segment (DPS) steelhead and Southern DPS green sturgeon, and Essential Fish Habitat for coho and Chinook salmon.
However, the field reconnaissance site visit on February 15, 2024 confirmed that there is no suitable aquatic habitat in the Project Area.
4.4.1.6 Wildlife Movement Corridors and Nursery Sites
There are no known migratory corridors and none are expected to occur due to the developed setting within the Study Area. The Study Area is not mapped as an area of interest under the California Essential Habitat Connectivity Project (California Department of Fish and Wildlife 2024). There is no suitable habitat for nursery sites (e.g., deer fawning grounds, waterbird rookeries).
4.4.1.7 City of Piedmont Heritage Trees
There are no designated Heritage Trees located in the vicinity of the Project Area.
Attachment 2 Agenda Report Page 97
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-22 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.4.2 Biological Resources (IV) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Have a substantial adverse effect, either directly
or through habitat modifications, on any species
identified as a candidate, sensitive, or specialstatus species in local or regional plans, policies, or regulations, or by the California Department of
Fish and Wildlife or U.S. Fish and Wildlife Service?
Less Than Significant Impact.
There are no potentially occurring special-status species in the Proposed Project Area. The Project is not expected to have adverse effects on special-status species. While not considered special-status species as defined, birds protected under the MBTA could potentially nest in close proximity to the Project. It is expected that birds nesting in this developed setting have become acclimated to human presence and disturbances. Consequently, any potential effects to MBTA protected birds would be less than significant.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community
identified in local or regional plans, policies,
regulations, or by the California Department of
Fish and Wildlife or U.S. Fish and Wildlife Service?
No Impact.
As discussed above, no sensitive natural communities were mapped within the Project Area (ECORP 2024, Appendix B), and none were observed during the February 2024 site visit. Therefore, implementation of the Proposed Project will not have an impact on sensitive natural communities or riparian habitats.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Have a substantial adverse effect on state or
federally protected wetlands (including, but not
limited to, marsh, vernal pool, coastal, etc.)
through direct removal, filling, hydrological
interruption, or other means?
□ □ □
□ □ □
□ □ □
Attachment 2 Agenda Report Page 98
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-23 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 No Impact.
As discussed above there are no aquatic resources located within the Proposed Project Area. Therefore, implementation of the Proposed Project would not have a substantial adverse effect on state or federally protected wetlands. There would be no impact and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife
species or with established native resident or
migratory wildlife corridors, or impede the use of
native wildlife nursery sites?
No Impact.
Since the majority of the Project is restricted to existing roadways, the Project will not impede habitat connectivity any more than the existing roads already affects habitat connectivity. Additionally, there is no fish habitat within the Project Area. Therefore, there will be no impact to migratory fish or wildlife movement within the Project Area.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?
Less Than Significant Impact.
The Proposed Project is within the existing public ROW, and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels. Implementation of the Proposed Project would not conflict with any local policies or ordinances protecting biological resources. Any impacts would be less than significant and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
f) Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural Community
Conservation Plan, or other approved local,
regional, or state habitat conservation plan?
□ □ □
□ □ □
□ □ □
Attachment 2 Agenda Report Page 99
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-24 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 No Impact.
The Proposed Project will take place within the existing ROW and will not modify habitat or impact natural communities. Therefore, the Project will not conflict with adopted Habitat Conservation Plans, Natural Community Conservation Plans, or other local, regional, or state habitat conservation plan.
4.4.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.5 Cultural Resources
ECORP Consulting, Inc. prepared a Historic Property Identification Report (ECORP 2024b) for the Proposed Project to determine if cultural resources were present in or adjacent to the Project Area and assess the sensitivity of the Project Area for undiscovered or buried cultural resources. Cultural resources include pre-contact archaeological sites, historic archaeological sites, and historic built environment sites. Precontact archaeological sites are places that contain the material remains of activities carried out by the native population of the area (i.e., Native Americans) prior to the arrival of Europeans in the Project Area.
Places that contain the material remains of activities carried out by people after the arrival of Europeans are considered historic archaeological sites. Historic built environment features include houses, garages, barns, commercial facilities, industrial facilities, community buildings, and other buildings, structures and facilities that are more than 50 years old. Historic built environment features may also have associated archaeological deposits, such as abandoned wells, cellars, privies, refuse deposits, and foundations of former outbuildings.
The information provided below is an abridged version of the Cultural Resources Inventory Report and is included here to provide a brief context of the potential cultural resources in the Project Area. Due to the sensitive nature of cultural resources and their records and documentation, which are restricted from public distribution by state and federal law, the IS/MND appendices do not include the report; however, all pertinent information necessary for impact determinations is included in this section.
4.5.1 Environmental Setting
The Proposed Project lies in the eastern area of the greater San Francisco Bay Area. The Project is located south of the Mountain View Cemetery, northeast of Lake Merritt, and east of the City of San Francisco.
Elevations range from 95 to 527 feet above mean sea level across the Project. The Proposed Project is less than 3 miles east of the Pacific Ocean and is 0.5 mile south of Indian Gulch.
The San Francisco Bay region is composed of three Mesozoic to Paleogene basement complexes. These complexes are overlain by Late cretaceous, Tertiary and Quaternary deposits, all of which have been offset by multiple faults along the Neogene San Andres fault system (ECORP 2024b).
To assess the potential for buried archaeological sites, ECORP reviewed reasonably available information regarding hydrology and soils. ECORP used geological data from the U.S. Department of Agriculture’s NRCS to characterize the geology of the local area in reference to archaeological history. Certain geological characteristics and formations are more likely to contain buried pre-contact archaeological Attachment 2 Agenda Report Page 100
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-25 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 materials. The underlying geomorphology of the Project area and immediate vicinity consists of Franciscan Complex (Coast Ranges) which date to 200 to 80 million years ago, and older Quaternary alluvium and marine deposits (ECORP 2024b).
According to the Historic Property Identification Report, the Project area has a low potential for buried pre-contact archaeological sites despite being in close proximity to several water sources, Lake Merritt, Indian Gulch, and the Pacific Ocean. Although alluvium deposits tend to preserve archaeological material and create an increased likelihood of pre-contact archaeological sites, the soils within the Project area are too old to have buried evidence of human occupation.
4.5.1.1 Project Area History
The Proposed Project is located in Alameda County, which was created in 1853 from portions of Contra Costa and Santa Clara counties. The Spanish word Alamo means poplar or cottonwood tree and Alameda means “a place where poplar trees grow” (ECORP 2024b). The county was named after the El Arroyo de la Alameda or Alameda Creek.
The beginning of the history of the City of Piedmont varies. One account stated 600 acres of land was purchased by a man named Walter Blair from the Peraltas. Others say the land was purchased by the US government from the Peraltas. The Peraltas family, namely Don Luis Maria Peralta, was granted 43,000 acres of land for his four decades of service. This land included what would become the cities of San Leandro, Oakland, Alameda, Emeryville, Piedmont, Berkeley, and Albany. Don Peralta divided his land between his four sons and the land that would become the City of Piedmont was included in portions belonging to Jose Domingo and Vicente Peralta. With the 1848 Treaty of Gudalupe Hidalgo and California’s statehood in 1850, ownership of these lands came into dispute. While the Peraltas retained some holdings, some of the land, including that of the City of Piedmont, would become property of the U.S. government (ECORP 2024).
4.5.1.2 Previous Research and Records
A total of 87 previous cultural resource investigations have been conducted in or within 1 mile of the Proposed Project, covering approximately 35 percent of the total area surrounding the project area within the records search radius. Of the 87 studies, 5 were conducted within the Proposed Project boundaries and the other 82 were within the 1-mile radius. These studies revealed the presence of historic-period sites, including structures and buildings either individually or as elements of a district, a cemetery, and pre-contact sites, including a shell scatter site and a cemetery. The previous studies were conducted between 2000 and 2018.
The results of the records search indicate that only approximately 80 percent of the Project area has been previously surveyed for cultural resources. Therefore, ECORP conducted a pedestrian survey for the Project under current protocols.
The records search also determined that 160 previously recorded pre-contact and historic-era cultural resources are located within 1 mile of the Project site. Of these 160 resources, two are believed to be associated with Native American occupation of the vicinity, and 158 are historic-era sites. These resources Attachment 2 Agenda Report Page 101
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-26 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 are associated with the Mountain View Cemetery District and are either individual buildings or structures; several are noted as being elements associated with a district in the area. There are no previously recorded resources within the Project site.
The Office of Historic Preservation’s (OHP) Built Environment Resource Directory for Alameda County (dated March 3, 2020) included three resources between sections of the Project area. One is the Wetmore House, located south of the Area of Potential Effects (APE) on Oakland Avenue and north of Piedmont Park, 0.14 mile south of the Project section on Bonita Avenue. Another is the Piedmont City Hall and Fire Station, located 158 feet southeast of the Wetmore House and 0.15 mile south of the section of the Project on Highland Avenue. The last one is the Piedmont Community Church, located approximately 500 feet south of the section of the Project on Oakland Avenue. There are no listed resources within the Proposed Project (ECORP 2024b).
The National Register Information System failed to reveal any eligible or listed properties within the APE.
The nearest National Register properties are Wetmore House, City Hall and Fire Station and Community Church, as described above.
ECORP reviewed resources listed as California Historical Landmarks by the OHP on March 8, 2024. The nearest listed landmark is #986 Piedmont Way. It is the first residential street design for Olmsted in 1865, which is a roadway that follows the natural contours of the landscape and is lined with foliage. It is located along Piedmont Avenue, between Gayley Road and Dwight Way. It is located 2.5 miles north-northwest of the nearest section to the above-mentioned streets of the Proposed Project.
A review of Historic Spots in California mentions the City of Piedmont is located on what was once Rancho San Antonio. This vast estate extended along the eastern shore of the San Francisco Bay, from San Leandro Creek to El Cerrito Creek.
The Bureau of Land Management’s patent database does not list any historic General Land Office land patent records for the Project area, as this land was a part of the Civil Colonies San Antonio Land Grant, which predates California becoming a state.
The Caltrans Bridge Local Bridge Inventory lists six bridges within 1 mile of the Proposed Project; the Oakland Avenue bridge is located approximately 200 feet to the west of the intersection of Oakland Avenue and Linda Avenue. The MacArthur Sidehill Viaduct is located 0.68 mile to the southwest of the Project site, south of SR-580 and north of MacArthur Boulevard. The Sausal Creek bridge is located 0.42 mile to the southwest of the Project site, southeast of Park Boulevard. The Park Boulevard Sidehill Viaducts #1, 2, and 3 are also approximately 0.4 mile east of the Project site, along Park Boulevard. These local bridges were all evaluated by Caltrans as Category 5 bridges, making them ineligible for inclusion in the National Register of Historic Places (NRHP).
The Caltrans State Inventory lists more than 20 state historic bridges within 1 mile of the Proposed Project. None of these bridges are within or in between any of the sections of the Project site. These state bridges lie along SR-580 to the south of the Proposed Project, along SR-13 (Monterey Boulevard) and SR24 to the north.
Attachment 2 Agenda Report Page 102
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-27 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.5.2 Cultural Resources (V) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Cause a substantial adverse change in the
significance of a historical resource pursuant to
Section 15064.5?
Less Than Significant Impact.
As mentioned in Section 4.5.1.2 above, the records search did not identify any historic-period or precontact cultural resources within the Proposed Project Area. Therefore, no Historic Properties under Section 106 of the National Historic Preservation Act (NHPA) or Historical Resources under CEQA will be impacted with implementation of the Proposed Project. Any impact will be less than significant.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Cause a substantial adverse change in the
significance of an archaeological resource
pursuant to Section 15064.5?
Less Than Significant With Mitigation.
The Proposed Project has a low potential for buried pre-contact archaeological sites despite being in close proximity to several water sources such as Lake Merritt, Indian Gulch, and the Pacific Ocean.
Although alluvium deposits tend to preserve archaeological material and create an increased likelihood of buried pre-contact archaeological sites, the soils within the Project area are too old to have buried evidence of human occupation. This potential is further reduced by the presence of the previously built environments within and surrounding the Proposed Project.
As mentioned above, the records search did not identify any historic-period or pre-contact cultural resources within the Proposed Project Area. Therefore, no Historic Properties under Section 106 of the NHPA or Historical Resources under CEQA will be impacted with implementation of the Proposed Project.
However, there always remains the potential for ground-disturbing activities to expose previously unrecorded cultural resources. Therefore, with implementation of mitigation measure CUL-1, which requires archeological spot checking, and CUL-2, which outlines procedures in the event of unanticipated discoveries, any impacts would be less than significant.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Disturb any human remains, including those
interred outside of dedicated cemeteries?
□ □ □
□ □ □
□ □ □
Attachment 2 Agenda Report Page 103
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-28 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Less Than Significant With Mitigation Incorporated.
There are no known burial or dedicated cemetery sites within the Project Area; however, as stated above in b) there always remains the potential for ground-disturbing activities to expose previously unrecorded cultural resources or human remains; therefore, with implementation of CUL-2, impacts to human remains will remain less than significant.
4.5.3 Mitigation Measures
CUL-1: Archaeological (Spot Checking). In Project areas with moderate to low archaeological sensitivity, a program of intermittent monitoring (spot-checking) of insertion pit excavation shall be developed and implemented by a qualified archaeologist.
In the event that presently unanticipated prehistoric and/or historic period cultural resources of significance are encountered within excavation activities, all activity in the area of discovery shall cease until the City retains the services of a qualified archaeological consultant who shall examine the findings, assess their significance, and offer proposals for any procedures deemed appropriate to further investigate and/or mitigate adverse impacts to those cultural resources that have been encountered
CUL-2: Unanticipated Discoveries. There always remains the potential for ground-disturbing activities to expose previously unrecorded cultural resources. Both CEQA and Section 106 of the NHPA require the lead agency to address any unanticipated cultural resource discoveries during Project construction. Therefore, the following procedures shall be implemented:
If subsurface deposits believed to be cultural or human in origin are discovered during construction, all work must halt within a 100-foot radius of the discovery. A qualified professional archaeologist, meeting the Secretary of the Interior’s Professional Qualification Standards for prehistoric and historic archaeology, shall be retained to evaluate the significance of the find, and shall have the authority to modify the no-work radius as appropriate, using professional judgment. The following notifications shall apply, depending on the nature of the find:
If the professional archaeologist determines that the find does not represent a cultural resource, work may resume immediately and no agency notifications are required.
If the professional archaeologist determines that the find does represent a cultural resource from any time period or cultural affiliation, the archaeologist shall immediately notify the lead agencies. The agencies shall consult on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined by CEQA or a historic property under Section 106 NHPA, if applicable. Work may not resume within the no-work radius until the lead agencies, through consultation as appropriate, determine that the site either: 1) is not a Historical Resource under CEQA or a Historic Property Attachment 2 Agenda Report Page 104
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-29 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 under Section 106; or 2) that the treatment measures have been completed to their satisfaction.
If the find represents a Native American or potentially Native American resource that does not include human remains, then he or she shall further notify [tribe]. The agencies shall consult with the tribes on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines. Preservation in place is the preferred treatment, if feasible. Work may not resume within the nowork radius until the lead agencies, through consultation as appropriate, determine that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) that the treatment measures have been completed to their satisfaction.
If the find includes human remains, or remains that are potentially human, they shall ensure reasonable protection measures are taken to protect the discovery from disturbance (Assembly Bill [AB] 2641). The archaeologist shall notify the Alameda County Coroner (per Section 7050.5 of the Health and Safety Code). The provisions of Section 7050.5 of the California Health and Safety Code, Section 5097.98 of the California PRC, and AB 2641 will be implemented. If the coroner determines the remains are Native American and not the result of a crime scene, the coroner will notify the NAHC, which then will designate a Native American Most Likely Descendant (MLD) for the Project (Section 5097.98 of the PRC). The designated MLD will have 48 hours from the time access to the property is granted to make recommendations concerning treatment of the remains. If the landowner does not agree with the recommendations of the MLD, the NAHC can mediate (Section 5097.94 of the PRC). If no agreement is reached, the landowner must rebury the remains where they will not be further disturbed (Section 5097.98 of the PRC). This will also include either recording the site with the NAHC or the appropriate Information Center; using an open space or conservation zoning designation or easement; or recording a reinternment document with the county in which the property is located (AB 2641). Work may not resume within the no-work radius until the lead agencies, through consultation as appropriate, determine that the treatment measures have been completed to their satisfaction.
4.6 Energy
This IS/MND analyzes energy consumption due to the potential direct and indirect environmental impacts associated with the Project. Such impacts include the depletion of nonrenewable resources (e.g., oil, natural gas, coal) and emissions of pollutants during the construction phase. As the Project is proposing the replacement of sanitary sewer collection pipes, the impact analysis focuses on the sole source of energy that is relevant to the Proposed Project: the equipment-fuel necessary for Project construction.
Attachment 2 Agenda Report Page 105
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-30 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.6.1 Environmental Setting
4.6.1.1 Electricity Services and Sources
California relies on a regional power system comprised of a diverse mix of natural gas, renewable, hydroelectric, and nuclear generation resources. Natural gas provides California with a majority of its electricity followed by renewables, large hydroelectric and nuclear. Pacific Gas and Electricity Company (PG&E) provides electricity and natural gas to Alameda County. It generates or buys electricity from hydroelectric, nuclear, renewable, natural gas, and coal facilities. PG&E provides natural gas and electricity to most of the northern two-thirds of California, from Bakersfield and Barstow to near the Oregon, Nevada, and Arizona State Line. It provides 5.2 million people with electricity and natural gas across 70,000 square miles. In 2022, approximately 40 percent of PG&E’s electricity came from renewable resources including biopower, geothermal, small hydroelectric, solar, and wind power. Overall 95 percent of the company's delivered electricity comes from greenhouse gas emission-free sources, including renewables, nuclear, and hydropower (PG&E 2024).
The California Public Utilities Commission (CPUC) regulates PG&E. The CPUC has developed energy efficiency programs such as smart meters, low-income programs, distribution generation programs, selfgeneration incentive programs, and a California solar initiative. Additionally, the California Energy Commission maintains a power plant database that describes all the operating power plants in the state by county.
4.6.1.2 Fuel Consumption
Vehicle fuel use is typically measured in gallons (e.g., of gasoline or diesel fuel), although energy use for electric vehicles is measured in kWh. CARB’s EMFAC Emissions Inventory extracts emissions from EMFAC2021, software that provides emissions from on- and off-road mobile sources in California (CARB 2021). Total automotive fuel consumption in Alameda County from 2019 to 2023 is shown in Table 4.6-1.
As shown, automotive consumption has decreased since 2019.
Table 4.6-1. Automotive Fuel Consumption in Alameda County from 2019 to 2023 Year Fuel Consumption (gallons)
2023 667,543,990
2022 670,489,751
2021 670,206,836
2020 604,228,941
2019 686,892,098
Source: California Air Resources Board (CARB) 2021
Attachment 2 Agenda Report Page 106
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-31 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.6.2 Energy (VI) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Result in potentially significant environmental
impact due to wasteful, inefficient, or
unnecessary consumption of energy resources,
during Project construction or operation?
Less Than Significant Impact.
The one source of energy associated with the Project includes the equipment fuel necessary for construction. For the purpose of this analysis, Project increases in construction fuel consumption are compared with the county-wide fuel consumption in 2023, the most recent full year of data (Table 4.6-2).
The amount of total construction-related fuel used was estimated using ratios provided in the Climate Registry’s General Reporting Protocol for the Voluntary Reporting Program, Version 2.1 (2016).
Table 4.6-2. Proposed Fuel Consumption
Energy Type Annual Fuel Consumed Percentage Increase
Countywide
Project Construction 15,172 gallons 0.002
Notes: The Project increase construction-related fuel consumption is compared with the countywide constructionrelated fuel consumption in 2023, the most recent full year of data.
Source: ECORP Consulting, Inc. using ratios provided in the Climate Registry’s General Reporting Protocol for the Voluntary Reporting Program, Version 2.1 (2016). See Appendix C.
As shown in Table 4.6-2, the Project’s gasoline fuel consumption during the construction period is estimated to be 15,172 gallons of fuel, which would increase the annual construction-related gasoline fuel use in the county by 0.002 percent during Project construction. As such, Project construction would have a nominal effect on local and regional energy supplies, especially over the long term. Additionally, construction equipment fleet turnover and increasingly stringent state and federal regulations on engine efficiency combined with state regulations limiting engine idling times and require recycling of construction debris, would further reduce the amount of transportation fuel demand during Project construction. For these reasons, it is expected that construction fuel consumption associated with the Project would not be any more inefficient, wasteful, or unnecessary than other similar development projects of this nature.
Operations of the Project would not generate any fuel consumption as it would not be contributing to any mobile sources. The Proposed Project includes the rehabilitation of sanitary sewer mains and their associated lower sewer laterals to minimize the number and impact of sanitary sewer overflows. The pipeline would not increase service capacity or extend service to areas that do not currently have service.
Additionally, the amount of effluent pumped would not increase as a result of the Project. Therefore, there are no operational emissions.
□ □ □
Attachment 2 Agenda Report Page 107
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-32 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?
No Impact.
The Project proposes the replacement of approximately 17,626 linear feet of sanitary sewer collection pipe to minimize the number and impact of sanitary sewer overflows as well as to take a proactive approach in addressing infiltration/inflow into the City’s sewer system. Overflows to the system occur because the City’s existing sanitary sewer system collects sanitary sewer flows from the city as well as wastewater from Oakland as it makes its way to the EBMUD No. 1 District Interceptor.
The City’s Climate Action Plan (CAP) 2.0 includes goals, policies, and strategies to reduce the City’s GHG emissions and support statewide climate efforts. Measure WW-2.1 promotes infrastructure improvements by repairing and maintaining existing water lines to prevent leaks. The Project would be designed in a manner that is consistent with relevant energy conservation plans designed to encourage development that results in the efficient use of energy resources. It does not conflict with or obstruct a plan for renewable energy or energy efficiency. Therefore, there would be no impact.
4.6.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.7 Geology and Soils
The Geology and Soils chapter of this document describes the geologic and soil characteristics of the Proposed Project Sites and evaluates the extent to which implementation of the Project could be affected by seismic-related ground failure and soil stability. Information sources for this evaluation include the City of Piedmont General Plan’s Environmental Hazards Element, and the NRCS.
4.7.1 Environmental Setting
4.7.1.1 Geomorphic Setting
Piedmont is located on the East Bay Plain (the Plain), a relatively flat area that extends 50 miles from Richmond in the north to San Jose in the south. The Plain is part of the larger Coast Ranges geomorphic province, one of the eleven geomorphic provinces in California. The Coast Ranges extend along the majority of California’s coast from the California-Oregon border to Point Arguello in Santa Barbara County in the south and consists of northwest-trending mountain ranges and valleys. The Coast Ranges are composed of Mesozoic and Cenozoic sedimentary, igneous, and metamorphic strata. The eastern side is characterized by strike-ridges and valleys in the Upper Mesozoic strata (Graymer, R.W. 2000). □ □ □
Attachment 2 Agenda Report Page 108
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-33 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.7.1.2 Regional Seismicity and Fault Zones
Classifying and Identifying Faults
Geologists have determined that the greatest potential for surface fault rupture and strong seismic ground shaking is from active faults, that is, faults with evidence of activity during the Holocene epoch (the last 11,700 years). Faults classified as potentially active (where there is evidence that movement has occurred during the last 1.6 million years), have a lower potential for surface fault rupture and strong seismic ground shaking. Pre-Quaternary faults have exhibited evidence of movement more than 1.6 million years Before Present, and therefore are not considered active. Pre-Quaternary faults are generally not considered to represent a surface fault rupture or strong seismic ground shaking hazard (unless those faults are influenced by human-caused activity such as construction of a large water-storage reservoir directly over a fault zone).
The City of Piedmont Local Hazard Mitigation Plan (LHMP) and the City of Piedmont Environmental Hazards Element noted that in the Central Bay Area, most earthquakes are associated with the San Andreas, Calaveras, and Hayward Faults. The San Andreas Fault traverses San Mateo County, about 15 miles west of Piedmont. The Calaveras Fault lies on the edge of the Diablo Range, about 15 miles to the east. The main trace of the Hayward Fault runs about 0.25 miles east of Piedmont, along an alignment that roughly parallels State Highway 13 (City of Piedmont 2009b, 2019).
Surface Fault Rupture
The 1972 Alquist-Priolo Earthquake Fault Zoning Act required the State Geologist to establish regulatory Earthquake Fault Zones around the surface traces of active faults, to mitigate the hazard of surface fault rupture to structures for human occupancy. For the purposes of the Act, an active fault is one that has ruptured in the last 11,000 years. The act only addresses the hazard of surface fault rupture and is not directed toward other earthquake hazards.
The City of Piedmont is not located within the Alquist-Priolo Zone of the Hayward Fault, thus the potential for surface rupture is low.
Seismic Ground Shaking
Ground shaking – motion that occurs as a result of energy released during faulting – could potentially result in the damage or collapse of buildings and other structures, depending on the magnitude of the earthquake, the location of the epicenter, and the character and duration of the ground motion. Other important factors to be considered are the characteristics of the underlying soil and rock and, where structures exist, the building materials used and the workmanship of the structures.
The U.S. Geological Survey and Association of Bay Area Governments (ABAG) have worked together to map the likely intensity of ground-shaking throughout the Bay Area under various earthquake scenarios.
The most intense ground-shaking scenario mapped in Piedmont assumes a magnitude 6.9 earthquake on the Hayward Fault. The predicted ground-shaking from such an earthquake would be “very violent” or “violent” throughout Piedmont (ABAG 2021).
Attachment 2 Agenda Report Page 109
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-34 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Liquefaction
Liquefaction is the sudden temporary loss of shear strength in saturated, loose to medium-dense, granular sediments to ground shaking. Liquefaction generally occurs when seismically induced ground shaking causes soil pore water pressure to increase to a point equal to the overburden pressure.
Liquefaction causes foundation failure of buildings and other structures due to the reduction of foundation bearing strength. The potential for liquefaction depends on the duration and intensity of earthquake shaking, particle size distribution of the soil, density of the soil, and elevation of the groundwater. Areas at risk due to the effects of liquefaction are typically those with a high groundwater table and underlying loose to medium-dense, granular sediments, particularly younger alluvium, and artificial fill. Piedmont is in an area identified by ABAG as having very low to low susceptibility to liquefaction except for a small portion of the city southeast of the intersection at Grand Avenue and Oakland Avenue, which is located in an area with high liquefaction risk. In addition, there may be areas of uncompacted fill, such as within Moraga Canyon.
The majority of the Proposed Project is within a very low liquefaction susceptibility area, with small portions being within a low liquefaction susceptibility area. (ABAG 2021).
Landslides
Ground failure including landslides is dependent on slope and geology as well as the amount of rainfall, excavation, or seismic activities. A landslide is a mass of rock, soil, and debris displaced down a slope by sliding, flowing, or falling. Steep slope sand downslope creep of surface materials characterize landslidesusceptible areas. Debris flows consist of a loose mass of rocks and other granular material that, if present on a steep slope and saturated, can move down slope. The rate of rock and soil movements can vary from a slow creep over many years to sudden mass movements.
Landslides occur throughout the State of California, but the density of incidents increases in zones of active faulting. Because of Piedmont’s varying topography, most the area is within moderate to very high landslide susceptibility zones. The western part of Piedmont generally has high landslide susceptibility, and the eastern part of the city generally has very high landslide susceptibility (City of Piedmont 2009b).
Seismic Seiches
Earthquakes may affect open bodies of water by creating seismic sea waves and seiches. Seismic sea waves (often called tidal waves) are caused by abrupt ground movements (usually vertical) on the ocean floor in connection with a major earthquake. Because of the Proposed Project’s long distance from the Pacific Ocean, seismic sea waves do not represent a hazard. A seiche is the sloshing of water in an enclosed or restricted water body, such as a basin, river, or lake, which is caused by earthquake motion; the sloshing can occur for a few minutes or several hours. There are no large water bodies in the Proposed Project Area where seiches would represent a hazard. There are no Federal Emergency Management Agency- (FEMA) designated 100-year Flood Hazard Areas in the City and is not susceptible to seiches and tsunamis in the San Francsico Bay. (City of Piedmont 2009b).
Attachment 2 Agenda Report Page 110
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-35 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.7.1.3 Soils
ECORP staff obtained soil survey mapping for the BSA from the NRCS Web Soil Survey accessed on February 20, 2024. Table 4.7-1 provides an overview of the soil series mapped within the BSA and key features of the soil series:
Table 4.7-1. Soil Series Mapped in the Proposed Project Area Map Unit
Symbol Map Unit Name Rating Hydric Soil Rating
126 Maymen loam, 30 to 75 percent slopes Residuum weathered from sedimentary rock
No
127 Maymen-Los Gatos complex, 30 to 75
percent slopes
Residuum weathered from sedimentary
rock
No
151 Urban land-tierra complex, 5 to 15 percent
slopes
Alluvium No
159 Xerorthents-Millsholm complex, 30 to 50
percent slopes
Residuum weathered from sandstone
and shale
No
4.7.1.4 Paleontological Resources
Paleontological resources, or fossils, are the evidence of once-living organisms preserved in the rock record. They include both fossilized remains of ancient plants and animals and the traces thereof) e.g., trackways, imprints, burrows, etc.). Paleontological resources occur within bedrock geologic deposits that may or may not underly the soil layer and are almost exclusively preserved in sedimentary rocks; however, in rare cases, fossils can also be preserved in volcanic rocks and low-grade metamorphic rocks under certain conditions. The Society of Vertebrate Paleontology has defined fossils as being remains or traces of plants and animals that are greater than 5,000 years old (i.e., older than middle Holocene in age).
ECORP performed a database search of the paleontology locality and specimen collection records for Alameda County from the University of California Museum of Paleontology (UCMP) in December 2023.
None of the specimen localities listed resources within the City of Piedmont. Additional information from a query from the Paleobiology Database did not show any resources within the City of Piedmont.
Attachment 2 Agenda Report Page 111
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-36 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.7.2 Geology and Soils (VII) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Directly or indirectly cause substantial adverse
effects, including the risk of loss, injury, or death
involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on
other substantial evidence of a known fault?
Refer to Division of Mines and Geology
Special Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including
liquefaction?
iv) Landslides?
Less Than Significant Impact.
i) The Hayward Fault runs east of Piedmont, but no part of the City of Piedmont is within or directly adjacent to the Hayward Fault’s Alquist-Priolo Zone. The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method.
Implementation of the Proposed Project would not directly or indirectly cause substantial adverse effects to rupture a known earthquake fault. Any impacts would be less than significant and no mitigation is required.
ii) The City of Piedmont is located in a seismically active region of California and is subject to potential ground shaking associated with seismic activities. All construction associated with the Proposed Project would be consistent with City and County policies, in addition to the California Building Code (CBC).
Installation of the proposed piping would be reviewed by City engineers to ensure that Proposed Project components are consistent with standard engineering practices and requirements which are specifically designed to prevent structural damage during seismic ground shaking. These standards are in place to reduce damage associated with ground-shaking as a result of potential earthquakes. Thus, the implementation of the Proposed Project would result in a less than significant impact and no mitigation is required.
iii) Liquefaction occurs when loose sand and silt saturated with water behaves like a liquid when shaken by an earthquake. Liquefaction potential has been found to be greatest where the groundwater level and loose sands occur within a depth of about 50 feet or less. According to ABAG, the Proposed Project is located in zones that would be considered very low or low risk for liquefaction. Therefore, it is unlikely □
□
□
□
□
□
□
□
□
□
□
□
Attachment 2 Agenda Report Page 112
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-37 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 that liquefaction would pose a hazard for the planned Project Area. Any impacts would be less than significant and no mitigation is required.
iv) Steep slopes, in conjunction with certain soil types, can be prone to soil erosion and landslides.
Landslides occur as a result of topographical and soil conditions, where loose soils move down steep slopes. Some of the natural causes of this instability are earthquakes, week soils, erosion, and heavy rainfall. Human activities such as poor grading that undercuts steep slopes or overloads them with fill, excessive irrigation, and removal of vegetation can also contribute to ground failure.
According to the City of Piedmont’s Environmental Hazards Element and the DOC, the City generally has high landslide susceptibility in the western area of town and very high landslide susceptibility in the eastern side of town, with moderate to low susceptibility in the center of the city. The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. The Project would be in compliance with all Piedmont General Plan policies, Piedmont City Code, and CBC requirements, which would ensure that impacts associated with landslides would be less than significant.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Result in substantial soil erosion or the loss of
topsoil?
Less Than Significant Impact.
The Proposed Project involves installation of Fusible HDPE pipe via pipe bursting in most cases. Pipe bursting will be used when there is sufficient room and access for the equipment, within Public ROW, and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels.
Potential excavation activities would include those for pipe bursting entry pits, lateral disconnection and reconnection, point repair, manhole replacement, and other improvements. The depth of excavation for these activities is limited, generally ranging from 6 to 8 feet below ground surface, though in some areas excavations of up to 15 feet may be necessary due to the depth of the existing manholes. Any impacts to topsoil erosion or the loss of topsoil would be less than significant impact.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Be located on a geologic unit or soil that is
unstable, or that would become unstable as a
result of the Project, and potentially result in
onsite or offsite landslide, lateral spreading,
subsidence, liquefaction or collapse?
□ □ □
□ □ □
Attachment 2 Agenda Report Page 113
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-38 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Less Than Significant Impact.
Lateral spreading is a form of horizontal displacement of soil toward an open channel or other free face, such as excavation boundary. Lateral spreading can result from either the slump of low cohesion and unconsolidated material or, more commonly, by liquefaction of either the soil layer or a subsurface layer underlying soil material on a slope, resulting in gravitationally driven movement.
The Proposed Project involves installation of Fusible HDPE pipe via pipe bursting in most cases. Pipe bursting will be used when there is sufficient room and access for the equipment, within Public ROW, and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels.
Potential excavation activities would include those for pipe bursting entry pits, lateral disconnection and reconnection, point repair, manhole replacement, and other improvements. The depth of excavation for these activities is limited, generally ranging from 6 to 8 feet below ground surface, though in some areas excavations of up to 15 feet may be necessary due to the depth of the existing manholes.
Compliance with City of Piedmont requirements, CBC Code seismic mitigation standards, and the distance from active faults, the potential for settlement or collapse at the site is considered unlikely. Any impacts would be less than significant.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Be located on expansive soil, as defined in Table
18-1-B of the Uniform Building Code (1994),
creating substantial direct or indirect risks to life
or property?
Less Than Significant Impact.
Expansive soils are characterized by high clay content which expands when saturated with water and shrinks when dry, potentially threatening the integrity of buildings and infrastructure foundations. Soils within the Project area have “low” to “moderate” potential for shrink-swell behavior, or expansiveness. The Proposed Project is required to comply with existing State of California and local laws and regulations, such as CBC Section R401.4.3, Piedmont City Code (PCC) Sections 802.020.S, and General Plan Environmental Hazards Element polices 18.1 and 18.4, which ensure that the impacts from development associated with implementation of the Proposed Project on expansive soil are minimized by requiring the submittal and review of detailed soils and geologic reports prior to construction.
The Proposed Project would be constructed using the pipe burst method to an already existing sewer lateral system and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels. No new development, structures, or grading will be necessary, therefore reducing the potential for hazards from unstable and expansive soils to less than significant. Thus, the Proposed Project would result in a less than significant impact and no mitigation is required. □ □ □
Attachment 2 Agenda Report Page 114
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-39 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
e) Have soils incapable of adequately supporting
the use of septic tanks or alternative wastewater
disposal systems where sewers are not available
for the disposal of wastewater?
Less Than Significant Impact.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. Implementation of the Proposed Project would enhance the City of Piedmont’s existing wastewater disposal system. Any impact would be less than significant and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
f) Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?
Less Than Significant With Mitigation Incorporated.
A paleontological record search was queried by ECORP through the UCMP and Paleobiology Database.
Two nearby Pleistocene-aged sites suggest the possibility of subsurface finds in the Quaternary alluvium.
The first was UCMP locality V3933 in the Montclair Playground (now Montclair Park) at 6226 Moraga Avenue, found in 1939. The original locality description states: "yellow sandy clay below heavy black loam, some of which (loam) was graded out of the lake near at hand. Many pieces of large bones (fragmentary) were found in this member" The fossils retained in the museum were UCMP 34807, a Mammuthus lower molar, and UCMP 34839, a camelid foot bone. The second UCMP locality 168 is a well that was excavated in 1922 at the corner of 30th and Telegraph. Here a fossil pinecone (UCMP 20540) was found in the solid clay subsoil at 42 feet below the surface. This find was published by Metcalf in 1923 [Metcalf, W. 1923. American Forestry v. 29, p172.]
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. In rare cases where pipe bursting equipment cannot be used, CIPP will be considered. Open trench will be only utilized when installing two-way cleanouts and reconnecting laterals to the new sanitary sewer pipelines. Therefore, given the type of construction that the project is proposing, it is unlikely that implementation of the Proposed Project would directly or indirectly destroy a unique paleontological resource. However, there is always a possibility and therefore, implementation of Mitigation Measure PALEO-1, it would ensure that impacts would remain at a less than significant level.
□ □ □
□ □ □
Attachment 2 Agenda Report Page 115
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-40 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.7.3 Mitigation Measures
PALEO-1: Discovery of Unknown Resources. If any paleontological resources (i.e., fossils) are found during Project construction, construction shall be halted immediately in the subject area and the area shall be isolated using orange or yellow fencing until the City is notified and the area is cleared for future work. A qualified paleontologist shall be retained to evaluate the find and recommend appropriate treatment of the inadvertently discovered paleontological resources. If the City resumes work in a location where paleontological remains have been discovered and cleared, the City will have a paleontologist onsite to confirm that no additional paleontological resources are in the area.
4.8 Greenhouse Gas Emissions
4.8.1 Environmental Setting
GHG emissions are released as byproducts of fossil fuel combustion, waste disposal, energy use, land use changes, and other human activities. This release of gases, such as CO2, CH4, N2O, and chlorofluorocarbons, creates a blanket around the earth that allows light to pass through but traps heat at the surface, preventing its escape into space. While this is a naturally occurring process known as the greenhouse effect, human activities have accelerated the generation of GHGs beyond natural levels. The overabundance of GHGs in the atmosphere has led to an unexpected warming of the earth and has the potential to severely impact the earth’s climate system.
Each GHG differs in its ability to absorb heat in the atmosphere based on the lifetime, or persistence, of the gas molecule in the atmosphere. CH4 traps more than 25 times more heat per molecule than CO2, and N2O absorbs 298 times more heat per molecule than CO2. Often, estimates of GHG emissions are presented in Carbon Dioxide Equivalents (CO2e). Expressing GHG emissions in carbon dioxide equivalents takes the contribution of all GHG emissions to the greenhouse effect and converts them to a single unit equivalent to the effect that would occur if only CO2 were being emitted.
4.8.2 Regulatory Setting
4.8.2.1 Bay Area Air Quality Management District
The Project Area is located in Alameda County, which is regulated by the BAAQMD. To provide guidance to local lead agencies on determining significance for GHG emissions in CEQA documents, BAAQMD CEQA Guidelines include guidance on assessing GHGs and climate change impacts as required under CEQA Section 15183.5(b). On April 20, 2023, the BAAQMD 2022 CEQA Guidelines were adopted. These guidelines present a project-level operational threshold of significance for GHG emissions based on adherence to a suite of BAAQMD performance standards for land uses projects directly related to building design, transportation and consistency with the CEQA Guidelines Section 15183.5(b) or compliance with a Qualified GHG Reduction Strategy. BAAQMD has developed GHG-reducing performance standards for land uses projects based on typical residential and commercial land use projects and typical long-term communitywide planning documents such as general plans and similar long-range development plans.
Attachment 2 Agenda Report Page 116
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-41 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 According to the BAAQMD, these performance standards may not be appropriate for other types of projects that do not fit into the mold of a typical residential or commercial project or general plan update (BAAQMD 2023). The BAAQMD states that lead agencies should keep this point in mind when evaluating other types of projects (BAAQMD 2023). Additionally, the BAAQMD performance standards are intended for new land use development projects to achieve California’s long-term climate goal of carbon neutrality by 2045. The Proposed Project is not a typical residential or commercial project and does not involve new land use. Therefore, the BAAQMD performance standards for land uses projects based on typical new residential and new commercial land use projects are not appropriate for use in this analysis.
4.8.2.2 California Air Pollution Control Officers Association The California Air Pollution Control Officers Association (CAPCOA) is an association of air pollution control officers representing all 35 local air quality agencies across California, including the BAAQMD. Established in 1976, CAPCOA's primary objectives include the advancement of clean air initiatives and to provide a platform for the exchange of knowledge, experience, and information among air quality regulatory bodies statewide. The association is dedicated to fostering unity and efficiency, aiming to promote consistency in methods and practices pertaining to air pollution control. CAPCOA convenes regularly with federal and state air quality officials to formulate statewide regulations and ensure uniform adherence to established rules. CAPCOA has instituted a GHG significance threshold of 900 metric tons of CO2e annually for the evaluation of proposed land use development projects. This threshold, indicating a 90 percent capture rate, encompasses projects representing approximately 90 percent of GHG emissions from new sources.
The 900 metric tons of CO2e per year threshold is typically utilized to classify small projects within California as inconsequential, as it accounts for less than one percent of the future 2050 statewide GHG emissions target. CAPCOA considers the 900 metric ton threshold sufficiently low to capture a significant portion of future residential and nonresidential development necessary for accommodating statewide population and economic growth. Simultaneously, it establishes the emission threshold at a level that excludes small projects contributing a relatively minor fraction of cumulative statewide GHG emissions.
The Project is compared to the CAPCOA significance threshold of 900 metric tons annually.
4.8.2.3 City of Piedmont Climate Action Plan 2.0
The City’s current CAP program is an update to the City’s Climate Action Plan and was adopted in March 2018. The CAP includes goals, policies, and strategies to reduce the City’s GHG emissions and support statewide climate efforts. The City established a goal to reduce GHG emissions 40 percent from the 2005 baseline by 2030 to achieve an 80 percent GHG reduction by 2050; however, in July 2023 the GHG reduction goals were updated. The updated goals are to reduce GHG emissions 50 percent by 2030 and to achieve carbon neutrality no later than 2045. GHG reduction strategies identified in the CAP include several measures that promote GHG reduction strategies in several sectors including transportation, buildings and energy, adaptation, municipal, solid waste, water, and consumption (City of Piedmont 2024).
The overarching goal of the CAP is to identify strategies to direct the City’s GHG reduction efforts, provide guidance for residents and businesses, and to support current statewide climate efforts (City of Piedmont 2018).
Attachment 2 Agenda Report Page 117
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-42 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.8.3 Greenhouse Gas Emissions (VIII) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Generate greenhouse gas emissions, either
directly or indirectly, that may have a significant
impact on the environment?
Less Than Significant Impact.
The Project has been compared to the CAPCOA GHG significance thresholds for construction since the BAAQMD performance standards for land uses projects based on typical new residential and new commercial land use projects are not appropriate for use in this analysis.
4.8.3.1 Construction-Related GHG Emissions
Construction-related activities that would generate GHG emissions include worker commute trips, haul trucks carrying supplies and materials to and from the Project Area, and off-road construction equipment (e.g., dozers, loaders, excavators). Table 4.8-1 illustrates the specific construction generated GHG emissions that would result from construction of the Project. Once construction is complete, the generation of these GHG emissions would cease.
Table 4.8-1. Construction-Related Greenhouse Gas Emissions Emission Source CO2e (Metric Tons/Year)
Construction 154
CAPCOA Significance Threshold 900
Exceed Significant Impact Threshold? No
Note: CAPCOA = California Air Pollution Control Officers Association; CO2e = Carbon Dioxide Equivalent Source: California Emissions Estimator Model (CalEEMod) version 2022.1.1. Refer to Appendix A for Model Data Outputs.
As shown in Table 4.8-1, Project construction would result in the generation of approximately 154 metric tons of CO2e over the course of construction, which is below the significance threshold of 900 metric tons of CO2e. Once construction is complete, the generation of these GHG emissions would cease.
Furthermore, GHG emissions generated by the construction sector have been declining in recent years.
For instance, construction equipment engine efficiency has continued to improve year after year. The first federal standards (Tier 1) for new off-road diesel engines were adopted in 1994 for engines over 50 horsepower (hp) and were phased in from 1996 to 2000. In 1996, a Statement of Principles pertaining to off-road diesel engines was signed between the USEPA, CARB, and engine makers (including Caterpillar, Cummins, Deere, Detroit Diesel, Deutz, Isuzu, Komatsu, Kubota, Mitsubishi, Navistar, New Holland, WisCon, and Yanmar). On August 27, 1998, the USEPA signed the final rule reflecting the provisions of the Statement of Principles. The 1998 regulation introduced Tier 1 standards for equipment under 50 hp and □ □ □
Attachment 2 Agenda Report Page 118
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-43 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 increasingly more stringent Tier 2 and Tier 3 standards for all equipment with phase-in schedules from 2000 to 2008. As a result, all off-road, diesel-fueled construction equipment manufactured in 2006 or later has been manufactured to Tier 3 standards. Tier 3 engine standards reduce precursor and subset GHG emissions such as nitrogen oxide by as much as 60 percent. On May 11, 2004, the USEPA signed the final rule introducing Tier 4 emission standards, which were phased in over the period of 2008-2015. The Tier 4 standards require that emissions of nitrogen oxide be further reduced by about 90 percent. All off-road, diesel-fueled construction equipment manufactured in 2015 or later will be manufactured to Tier 4 standards.
4.8.3.2 Operational GHG Emissions
The Proposed Project includes the rehabilitation of sanitary sewer mains and their associated lower sewer laterals to minimize the number and impact of sanitary sewer overflows. The amount of effluent pumped would not increase. Therefore, there are no operational emissions.
For these reasons, the Proposed Project’s construction GHG emissions would have a less than a significant impact.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Conflict with an applicable plan, policy or
regulation adopted for the purpose of reducing
the emissions of greenhouse gases?
No Impact.
The City of Piedmont has developed a CAP to provide a framework for reducing GHG emissions. The measures in the CAP are projected to accomplish the goal to reduce GHG emissions 40 percent from the 2005 baseline by 2030 to achieve an 80 percent GHG reduction by 2050. In July 2023, the City updated the GHG reduction goals to reduce GHG emissions 50 percent by 2030 and to achieve carbon neutrality no later than 2045 (City of Piedmont 2018, 2024). CAP Measure WW-2.1 promotes infrastructure improvements by repairing and maintaining existing water lines to prevent leaks. The Project would be designed in a manner that is consistent with relevant energy conservation plans designed to encourage development that results in the efficient use of energy resources. It does not conflict with or obstruct a plan for renewable energy or energy efficiency.
As previously described, the State of California promulgates several mandates and goals to reduce statewide GHG emissions, including the goals to reduce statewide GHG emissions to 40 percent below 1990 levels by the year 2030 (Senate Bill [SB] 32) and 80 percent below 1990 levels by 2050 (Executive Order [EO] S-03-05). The Proposed Project would comply with CAPCOA’s threshold of 900 metric tons of CO2e per year, which was developed in consideration of statewide GHG reduction goals. CAPCOA considers the 900 metric ton threshold sufficiently low to capture a significant portion of future residential and nonresidential development necessary for accommodating statewide population and economic growth. Simultaneously, it establishes the emission threshold at a level that excludes small projects □ □ □
Attachment 2 Agenda Report Page 119
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-44 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 contributing a relatively minor fraction of cumulative statewide GHG emissions. Furthermore, the Project would not include new permanent sources of GHG emissions and would not generate new or unplanned permanent GHG emissions. Therefore, the Project would not interfere with the state’s goals of reducing GHG emissions 40 percent below 1990 levels by 2030 and 80 percent below 1990 levels by 2050, as established in SB 32 and EO S-03-05.
During construction, the Project would utilize equipment in compliance with CARB requirements. Mobile sources during construction would be subject to the requirements of California Assembly Bill 1493 (Pavley Standards), the Advanced Clean Cars Program, and the Low Carbon Fuel Standard Regulation. These regulations require projects to comply with specific standards related to energy efficiency construction practices.
For these reasons, the Project would not conflict with any applicable plan, policy, or regulation related to the reduction in GHG emissions. There is no impact.
4.8.4 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.9 Hazards and Hazardous Materials
4.9.1 Environmental Setting
A material is considered hazardous if it appears on a list of hazardous materials prepared by a federal, state, or local agency, or if it has characteristics defined as hazardous by such an agency. A hazardous material is defined by the California Health and Safety Code, Section 25501 as follows:
“Hazardous material” means any material that, because of its quantity, concentration, or physical or chemical characteristics, poses a significant present or potential hazard to human health and safety or to the environment if released into the workplace or the environment. "Hazardous materials" include, but are not limited to, hazardous substances, hazardous waste, and any material that a handler or the administering agency has a reasonable basis for believing that it would be injurious to the health and safety of persons or harmful to the environment if released into the workplace or the environment.
A hazardous material is defined in 22 CCR Section 662601.10 as follows:
A substance or combination of substances which, because of its quantity, concentration, or physical, chemical or infectious characteristics, may either (1) cause, or significantly contribute to, an increase in mortality or an increase in serious irreversible, or incapacitating reversible, illness; or (2) pose a substantial present or potential hazard to human health or environment when improperly treated, stored, transported or disposed of or otherwise managed.
Transporters of hazardous waste in California are subject to several federal and state regulations. They must register with the California Department of Health Services (DHS) and ensure that vehicle and waste container operators have been trained in the proper handling of hazardous waste. Vehicles used for the transportation of hazardous waste must pass an annual inspection by the California Highway Patrol (CHP).
Attachment 2 Agenda Report Page 120
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-45 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Transporters must allow the CHP or DHS to inspect its vehicles and must make certain required inspection records available to both agencies. The transport of hazardous materials that are not wastes is regulated by the U.S. Department of Transportation through national safety standards.
The Alameda County Department of Environmental Health (ACDEH) includes a Hazardous Materials Division which regulates clean water, Certified Unified Program Agency (CUPA), and waste tires within Alameda County. The ACDEH, through the Clean Water Program, helps: reduce or eliminate the pollution of receiving waters, including creeks and the San Francisco Bay; and protect and enhance the water quality in county water bodies, including watercourses, wetlands, creeks, and flood control facilities. The ACDEH is also the CUPA that coordinates and enforces numerous local, State, and federal hazardous materials management and environmental protection programs in the county, including in the City of Piedmont. The ACDEH was granted waste tire enforcement activity authority by CalRecycle for all of Alameda County which allows them to enforce requirements for the storage and disposal of waste tires.
Under Government Code Section 65962.5, both the Department of Toxic Substances Control (DTSC) and the SWRCB are required to maintain lists of sites known to have hazardous substances present in the environment. Both agencies maintain up-to-date lists on their websites. The Proposed Project sites are not listed by the DTSC as a hazardous substances site on the list of hazardous waste sites compiled pursuant to Government Code Section 65962.5 (Cortese List) (DTSC 2023). Per the SWRCB Cortese List, there is a site that had naturally occurring asbestos at the Frank C. Havens Elementary School, but the case was closed in 2010.
4.9.2 Hazards and Hazardous Materials (IX) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Create a significant hazard to the public or the
environment through the routine transport, use,
or disposal of hazardous materials?
Less Than Significant Impact.
The Proposed Project involves installation of Fusible HDPE pipe via pipe bursting in most cases. Pipe bursting will be used when there is sufficient room and access for the equipment, within Public ROW, and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels. In rare cases where pipe bursting equipment cannot be used, CIPP will be considered. Open trench will only be utilized when installing two-way cleanouts and reconnecting laterals to the new sanitary sewer pipelines.
Construction may include the use of hazardous materials, given that construction activities involve the use of heavy equipment, which uses small and incidental amounts of oils and fuels and other potentially flammable substances. The level of risk associated with the accidental release of hazardous substances is not considered significant due to the small volume and low concentration of hazardous materials used during construction. The construction contractor would be required to use standard construction controls □ □ □
Attachment 2 Agenda Report Page 121
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-46 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 and safety procedures that would avoid and minimize the potential for accidental release of such substances into the environment. Standard construction practices would be observed such that any materials released are appropriately contained and remediated as required by local, state and federal law.
The transport of hazardous materials by truck is regulated by federal safety standards under the jurisdiction of the U.S. Department of Transportation. The use of such materials would not create a significant hazard to the public and impacts would be less than significant. No mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Create a significant hazard to the public or the
environment through reasonably foreseeable
upset and accident conditions involving the
release of hazardous materials into the
environment?
Less Than Significant Impact.
Onsite storage and/or use of large quantities of hazardous materials capable of affecting soil and groundwater are not proposed; therefore, the potential risk associated with accidental discharge associated with use and storage of equipment-related hazardous materials during pipe construction is considered low. The Proposed Project is an infrastructure project that would not require the long-term use or storage of hazardous substances. No potential for the release of hazardous materials into the environment is expected. Furthermore, as indicated in the Project Description, the Proposed Project is a sewer rehabilitation project in the City’s service area. The existing sewer lines were previously installed before 1920 and have exceeded their useful life and allow for excessive infiltration/inflow of groundwater in certain areas of the collection system. Due to the existing pipes’ age and condition, there is an existing high risk due to pipeline failure. Implementation of the Proposed project would have a beneficial impact by reducing the risk of failure and any associated risk to public health and environment. A less than significant impact would occur and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or
proposed school?
Less Than Significant Impact.
Portions of the Proposed Project are within one-quarter mile of Wildwood Elementary School, Piedmont Middle School, and Piedmont High School. The use of hazardous materials would be limited during construction activities and would include traditional materials typically associated with public works construction projects such as gasoline, diesel, oil, paint, resin and epoxy concrete. All hazardous materials, □ □ □
□ □ □
Attachment 2 Agenda Report Page 122
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-47 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 substances, or waste would be handled consistent with federal, state, and local regulations. Any impacts would be less than significant.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a
result, would it create a significant hazard to the
public or the environment?
No Impact.
Under Government Code Section 65962.5, both DTSC and the SWRCB are required to maintain lists of sites known to have hazardous substances present in the environment. Both agencies maintain up-to-date lists on their websites. A search of the of the DTSC and SWRCB lists identified that the Proposed Project Sites are not located on a hazardous material site. However, a portion of the project is adjacent to Frank C.
Havens Elementary School, which had Naturally Occurring Asbestos. The case was closed in 2010. No impact would occur and no mitigation is required.
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
e) For a Project located within an airport land use
plan or, where such a plan has not been adopted,
within two miles of a public airport or public use
airport, would the Project result in a safety hazard
for people residing or working in the Project
Area?
No Impact.
There are no airport or airstrip facilities in Piedmont. The nearest airport is Oakland International Airport, which is located 7.8 miles south of Piedmont. Therefore, no safety hazards to people residing or working in the Project Area would result due to the proximity to a public or public use airport. No impact would occur.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
f) Impair implementation of or physically interfere
with an adopted emergency response plan or
emergency evacuation plan?
□ □ □
□ □ □
□ □ □
Attachment 2 Agenda Report Page 123
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-48 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Less Than Significant With Mitigation Incorporated.
The City of Piedmont adopted the LHMP in 2019 and is considered the primary document when discussing how disasters will be managed by the city. Most of the Project construction would occur within the ROW, which could be utilized during an emergency evacuation. Construction activities could impede the use of surrounding roadways. Therefore, the Proposed Project would require implementation of Mitigation Measure TRANS-1 (Section 4.17) that requires preparation and implementation of a Construction Traffic Management Plan. This mitigation measure would assist in maintaining traffic flow along roadways during construction activities. After construction of the Project is completed, the Project site would be restored to the existing condition. Therefore, implementation of the Proposed Project would not obstruct evacuation routes or access to critical emergency facilities. Once construction is completed, the Proposed Project would not interfere with the LHMP or any evacuation. This impact is less than significant with mitigation.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
g) Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury or
death involving wildland fires?
Less Than Significant Impact.
The Proposed Project is located within the City of Piedmont, which has an elevated risk of wildfires; Section 4.20 provides further discussion. The City of Piedmont is outside of a State Responsibility Area (California Department of Forestry and Fire Protection [CAL FIRE] 2024). Eastern portions of the City are considered to be at a very high risk for fires as recommended by CAL FIRE (2008), however, the Proposed Project is outside of these locations. The Proposed Project includes the rehabilitation of the existing sewer pipeline infrastructure, and no habitable structures are proposed as part of the Proposed Project.
The Proposed Project would be required to comply with existing City standards to provide adequate access, fire flows, and other facilities to maintain an appropriate level of fire protection. Additionally, the Project would be required to comply with the California Building Code and California Fire Code. Therefore, the Proposed Project would not exacerbate the existing conditions and would not expose people or structures to a significant risk of loss, injury or death involving wildfires. Therefore, impacts would be less than significant. No mitigation is required.
4.9.3 Mitigation Measures
Implement Mitigation Measure TRANS-1.
□ □ □
Attachment 2 Agenda Report Page 124
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-49 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.10 Hydrology and Water Quality
4.10.1 Environmental Setting
4.10.1.1 Regional Hydrology
Watersheds
The California Department of Water Resources divides surface watersheds in California into 10 hydrologic regions. Piedmont lies in San Francisco Bay Hydrologic Region (Bay Region), which contains 33 alluvial groundwater basins, covers approximately 4,500 square miles, and includes all of San Francisco County and portions of Marin, Sonoma, Napa, Solano, San Mateo, Santa Clara, Contra Costa, and Alameda counties. The Bay Region comprises numerous watersheds that drain directly into San Francisco Bay, downstream of other watersheds such as the Sacramento San-Joaquin River Delta and coastal creek watersheds in Marin and San Mateo counties that drain directly to the Pacific Ocean.
Piedmont is located on the eastern portion of the San Francisco Bay Area and is surrounded by the City of Oakland. There is one primary watershed within the city limits. The Indian Gulch/Pleasant Valley Creek Watershed covers about three-square miles, draining much of the City of Piedmont and parts of the Lower Hills District in the City of Oakland (Alameda County Flood Control & Water Conservation District 2023). The watershed in Piedmont utilizes five small creeks that converge downstream and flow into eastern Lake Merritt, and from there into the San Francisco Bay.
Surface Water
According to the City of Piedmont’s Natural Resources and Sustainability Element, there are several creeks, lakes and reservoirs within and adjacent to Piedmont. Within Piedmont, there is one reservoir (EBMUD Reservoir Number 2) and one privately-owned, man-made lake near LaSalle Avenue. There are a few lakes that slightly cross over the northern boundary of the city limits, but those are under the jurisdiction of the Mountain View Cemetery (City of Piedmont 2009d).
Groundwater
Piedmont lies within the East Bay Plain Subbasin for which the East Bay Municipal Utility District (EBMUD) serves as the Groundwater Sustainability Agency. Water supply in Piedmont is also provided by EBMUD.
The majority of the water delivered by EBMUD originates from the Mokelumne River watershed, and the remaining water originates as runoff from the protected watershed lands and reservoirs in the East Bay Hills.
4.10.1.2 Regional Water Quality
The San Francisco Bay region’s immediate watershed is highly urbanized, resulting in contaminant loads from point and nonpoint sources. Stormwater runoff pollutants vary with land use, topography, and the amount of impervious surface, as well as the amount and frequency of rainfall and irrigation practices.
Typically, runoff in developed areas contains oil, grease, litter, and metals accumulated in streets, Attachment 2 Agenda Report Page 125
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-50 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 driveways, parking lots, and rooftop. It also contains pollutants applied to landscaped areas. Other contaminants can include chemicals, dust, and smoke pollution that settles or settled out of the air, such as residual lead from leaded gasoline. Stormwater runoff generated in Piedmont eventually discharges into San Francisco Bay. The runoff is conveyed by storm drains, open channel creeks, and culverted creeks to the Bay. The San Francisco Bay Regional Water Quality Control Board (SFBRWQCB) is the primary agency charged with protecting and enhancing surface and ground water quality in the region (City of Piedmont 2009a).
The SFBRWQCB monitors surface water quality through implementation of the Basin Plan and designates beneficial uses for surface water bodies and groundwater. Four of the waterways within the Indian Gulch/Watershed are aboveground and have been assigned some beneficial uses by the San Francisco Bay RWQCB (SFBRWQCB 2023).
4.10.1.3 Site Hydrology and Onsite Drainage
The Proposed Project (Project) consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method (Figure 2-2). The project will include the following elements:
15,166 linear feet of 6-inch pipe,
949 linear feet of 8-inch pipe,
458 linear feet of 10-inch pipe,
1,267 linear feet of 12-inch pipe,
241 linear feet of 15-inch pipe,
39 Main cleanout/Lamp hole replacements,
280 Lateral reconnection/Two-way cleanout installations; and 4 manholes
It is assumed that the existing manholes will be reused and reconnected to the new pipe. All sewer main cleanouts and lamp holes are assumed to be replaced and two-way cleanouts will be installed at the upstream limit of the rehabilitated lower sewer lateral behind the curb, sidewalk, or backyard. There are 280 assumed lateral reconnections/two-way cleanout installations by estimating adjacent properties of each pipe segment. By the end of the Proposed Project, the city will have rehabilitated/replaced 73% of its sewer mains.
A Biological Resources Assessment report was prepared for the Proposed Project by ECORP Consulting, Inc. (ECORP 2024b, Appendix B). The report identified that the Project is within an urban setting, including within existing paved streets, sidewalks, residential yards, and the City’s corporation yard at Red Rock Road, which is a paved and developed facility. The field reconnaissance conducted on February 15, 2024 confirmed that there are no aquatic resources within the Project Area. Review of the NWI showed that there are no previously mapped aquatic features within the Proposed Project Area.
Attachment 2 Agenda Report Page 126
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-51 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.10.2 Hydrology and Water Quality (X) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Violate any water quality standards or waste
discharge requirements or otherwise substantially
degrade surface or groundwater quality?
Less Than Significant Impact.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. The existing sewer lines are in poor condition and are showing signs of structural failure. Implementation of the Proposed Project would actually protect against potential hazards to water quality standards because if the existing sewer lines fail, it would enable wastewater to migrate to underlying groundwater, or cause overflow, which would discharge to the storm drains or creeks. Additionally, the pipeline wouldn’t increase service capacity or extend service to areas that do not currently have service. As such, long-term operation of the Proposed Project will have less than significant impact on existing water quality standards or waste discharge requirements.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge
such that the Project may impede sustainable
groundwater management of the basin?
Less Than Significant Impact.
The Proposed Project would utilize the pipe bursting method for the replacement sanitary sewer collection when there would be sufficient room and access for the equipment and would be within the Public ROW, and within accessible private property via City’s “Right of Entry” on front yard and back yard private parcels. In rare cases where pipe bursting equipment cannot be used, CIPP will be considered.
Open trench construction will only be utilized when installing two-way cleanouts and reconnecting laterals to the new sanitary sewer pipelines. The pipeline wouldn’t increase service capacity or extend service to areas that do not currently have service. Due to the linear nature of the proposed pipeline and proposed restoration of any construction staging areas, any localized effects of the Proposed Project on groundwater recharge would be unsubstantial.
However, past projects that were part of the City’s Sanitary Rehabilitation Project, required limited dewatering due to encountering shallow groundwater. If necessary for the Proposed Project, the amount of dewatering is expected to be minimal as it would be limited to a small, localized area. Therefore, any impact to groundwater supplies is expected to be less than significant. □ □ □
□ □ □
Attachment 2 Agenda Report Page 127
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-52 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Substantially alter the existing drainage pattern
of the site or area, including through the
alteration of the course of a stream or river or
through the addition of impervious surfaces, in a
manner that would:
i) result in substantial erosion or siltation onsite
or offsite;
ii) substantially increase the rate or amount of
surface runoff in a manner which would
result in flooding onsite or offsite;
iii) create or contribute runoff water which
would exceed the capacity of existing or
planned stormwater drainage systems or
provide substantial additional sources of
polluted runoff; or
iv) impede or redirect flood flows?
Less Than Significant Impact.
The Proposed Project does not involve substantial alteration of the existing drainage pattern along the pipeline alignment. The Proposed Project involves replacing approximately 17,626 linear feet of sanitary sewer collection utilizing the pipe burst method. As mentioned previously in this document, pipe bursting is a trenchless method of replacing buried pipelines without the need for traditional construction trenching. Pipe bursting has substantially less construction work and surface disturbance than traditional dig-and-replace methods. Open trench construction will only be utilized when installing two-way cleanouts and reconnecting laterals to the new sanitary sewer pipelines.
The Proposed Project would be required to obtain an EBMUD permit and adhere to the PCC Sections 1805.4.3, 8.12.030, 30.10, and 30.11, which would control stormwater runoff and protect water quality. Any impacts to stormwater and drainage would be less than significant.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) In flood hazard, tsunami, or seiche zones, risk
release of pollutants due to Project inundation?
□
□
□
□
□
□
□
□
□
□ □
□
□
□
□
Attachment 2 Agenda Report Page 128
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-53 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 No Impact.
The Proposed Project is not located in an area that is at risk of flood hazard, tsunami, or seiche zones.
Therefore, there is not a risk of pollutant release during these events as a result of the Proposed Project.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
e) Conflict with or obstruct implementation of a
water quality control plan or sustainable
groundwater management plan?
Less Than Significant Impact.
As discussed above, the sewer pipe replacement would be constructed with the pipe bursting method.
The Proposed Project would be required to obtain an EBMUD permit and adhere to the PCC Sections 1805.4.3, 8.12.030, 30.10, and 30.11, which would control stormwater runoff and protect water quality. The Proposed Project is part of the City’s Sanitary Sewer Rehabilitation Project, which is to rehabilitate all 22 sub-basins in order to comply with RWQCB and a Consent Decree requirement to minimize the number and impact of sanitary sewer overflows as well as to take a proactive approach in addressing infiltration/inflow into the sewer system. Implementation of the Proposed Project would not conflict or obstruct implementation of a water quality control plan or sustainable groundwater management plan and would actually be consistent with the City’s Sanitary Sewer Rehabilitation Project. Any impacts would be less than significant and no mitigation is required.
4.10.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.11 Land Use and Planning
4.11.1 Environmental Setting
Within the Project limits, the proposed sewer pipeline would be located within the existing road ROW and the front and backyards of private properties. It would be in residential areas off of Park Way, Oakland Avenue, and Scenic Avenue. The extent of the Project construction would occur on land designated as ROW by the City of Piedmont General Plan Land Use Element. The parcels immediately surrounding the Proposed Project Area have Low Density Residential and Public Facilities land use designations. No land use designations will be altered with implementation of the Proposed Project.
4.11.2 Land Use and Planning (XI) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Physically divide an established community?
□ □ □
□ □ □
Attachment 2 Agenda Report Page 129
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-54 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 No Impact.
The Proposed Project involves rehabilitation of existing sewer lines, primarily within land designated as Public ROW. In some cases, the project includes land designated as residential, and would be accessed via the City’s “Right of Entry” on front yard and back yard private residences. The Proposed Project would not physically divide an established community and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Cause a significant environmental impact due to
a conflict with any land use plan, policy, or
regulation adopted for the purpose of avoiding
or mitigating an environmental effect?
No Impact.
The Proposed Project is consistent with the City of Piedmont’s adopted General Plan policy. The Proposed Project is part of a phased program to systematically replace the wastewater lines that are almost a century old. Thus, Project implementation would not cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. There would be no impact and no mitigation is required.
4.11.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.12 Mineral Resources
4.12.1 Environmental Setting
Minerals are defined as any naturally occurring chemical elements or compounds formed by inorganic processes and organic substances. Minable minerals are defined as a deposit of ore or minerals having a value materially in excess of the cost of developing, mining, and processing the mineral and reclaiming the Project Area. The conservation, extraction, and processing of mineral resources is essential to meeting the needs of society.
The Surface Mining and Reclamation Act of 1975 (SMARA) states that cities and counties shall adopt ordinances “...that establish procedures for the review and approval of reclamation plans and financial assurances and the issuance of a permit to conduct surface mining operations...” (PRC Section 2774). The intent of this legislation is to ensure the prevention or mitigation of the adverse environmental impacts of mining, the reclamation of mined lands, and the production and conservation of mineral resources are consistent with recreation, watershed, wildlife, and public safety objectives (PRC Section 2712).
SMARA requires the State Geologist to classify land into Mineral Resource Zones (MRZs) according to the known or inferred mineral potential of that land. The process is based solely on geology, without regard □ □ □
Attachment 2 Agenda Report Page 130
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-55 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 to existing land use or land ownership. The primary goal of mineral land classification is to ensure that the mineral potential of land is recognized by local government decision makers and considered before land use decisions, which could preclude mining, are made. Areas subject to California mineral land classification studies are divided into the following Mineral Resource Zone (MRZ) categories that reflect varying degrees of mineral potential:
MRZ-1: Areas of no mineral resource significance
MRZ-2: Areas of identified mineral resource significance MRZ-3: Areas of undetermined mineral resource significance MRZ-4: Areas of unknown mineral resource significance According to the Department of Conservation mapping software, the Project Area is listed as MRZ-2b (Stinson, Manson, and Plappert 1987). MRZ-2b are areas underlain by mineral deposits where geologic information indicates that significant inferred resources are present. However, the City of Piedmont General Plan stated that the city does not have significant mineral resources or active mining sites. The City’s main mineral resources are volcanic rocks, and two sandstone aggregate quarries that once existed.
The City’s quarries were converted to other uses through urbanization and are not expected to resume operation due to the City’s built up residential character and the lack of suitable sites. Piedmont contains no known oil, gas, or geothermal resources suitable for extraction (City of Piedmont 2009d).
4.12.2 Mineral Resources (XII) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Result in the loss of availability of a known
mineral resource that would be of value to the
region and the residents of the state?
No Impact.
The Proposed Project alignment is not within an area identified as having the potential for mineral resources by the County and is in a fully urbanized community. Therefore, implementation of the Proposed Project would not result in the loss of availability of a known mineral resource. No impact would occur.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Result in the loss of availability of a locallyimportant mineral resource recovery site delineated on a local general plan, specific plan
or other land use plan?
□ □ □
□ □ □
Attachment 2 Agenda Report Page 131
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-56 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 No Impact.
The Proposed Project alignment is not within an area identified as having the potential for mineral resources by the City (City of Piedmont 2009d). Therefore, implementation of the Proposed Project would not result in the loss of availability of a known mineral resource. No impact would occur.
4.12.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.13 Noise
4.13.1 Environmental Setting
4.13.1.1 Noise Fundamentals
Noise is generally defined as sound that is loud, disagreeable, or unexpected. The selection of a proper noise descriptor for a specific source is dependent on the spatial and temporal distribution, duration, and fluctuation of the noise. The noise descriptors most often encountered when dealing with traffic, community, and environmental noise include the average hourly noise level (in Leq) and the average daily noise levels/community noise equivalent level (in Ldn/CNEL). The Leq is a measure of ambient noise, while the Ldn and CNEL are measures of community noise. Each is applicable to this analysis and defined as follows:
Equivalent Noise Level (Leq) is the average acoustic energy content of noise for a stated period of time. Thus, the Leq of a time-varying noise and that of a steady noise are the same if they deliver the same acoustic energy to the ear during exposure. For evaluating community impacts, this rating scale does not vary, regardless of whether the noise occurs during the day or the night.
Day-Night Average (Ldn) is a 24-hour average Leq with a 10-dBA weighting added to noise during the hours of 10:00 pm to 7:00 am to account for noise sensitivity in the nighttime. The logarithmic effect of these additions is that a 60 dBA 24-hour Leq would result in a measurement of 66.4 dBA Ldn.
Community Noise Equivalent Level (CNEL) is a 24-hour average Leq with a 5-dBA weighting during the hours of 7:00 pm to 10:00 pm and a 10-dBA weighting added to noise during the hours of 10:00 pm to 7:00 am to account for noise sensitivity in the evening and nighttime, respectively.
Noise can be generated by a number of sources, including mobile sources, such as automobiles, trucks and airplanes, and stationary sources, such as construction sites, machinery, and industrial operations.
Sound spreads (propagates) uniformly outward in a spherical pattern, and the sound level decreases (attenuates) at a rate of approximately 6 dB for each doubling of distance from a stationary or point source. Sound from a line source, such as a highway, propagates outward in a cylindrical pattern, often Attachment 2 Agenda Report Page 132
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-57 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 referred to as cylindrical spreading. Sound levels attenuate at a rate of approximately 3 dB for each doubling of distance from a line source, such as a roadway, depending on ground surface characteristics.
Soft surfaces, such as soft dirt or grass, can absorb sound, so an excess ground-attenuation value of 1.5 dB per doubling of distance is normally assumed (Federal Highway Administration 2011).
The manner in which older structures in California were constructed generally provides a reduction of exterior-to-interior noise levels of about 20 to 25 dBA with closed windows (Caltrans 2002). The exteriorto-interior reduction of newer structures is generally 30 dBA or more (Harris Miller & Hanson Inc. 2006).
4.13.1.2 Human Response to Noise
The human response to environmental noise is subjective and varies considerably from individual to individual. Noise in the community has often been cited as a health problem, not in terms of actual physiological damage, such as hearing impairment, but in terms of inhibiting general well-being and contributing to undue stress and annoyance. The health effects of noise in the community arise from interference with human activities, including sleep, speech, recreation, and tasks that demand concentration or coordination. Hearing loss can occur at the highest noise intensity levels.
Noise environments and consequences of human activities are usually well represented by median noise levels during the day or night or over a 24-hour period. Environmental noise levels are generally considered low when the CNEL is below 60 dBA, moderate in the 60- to 70-dBA range, and high, above 70 dBA. Examples of low daytime levels are isolated, natural settings with noise levels as low as 20 dBA and quiet, suburban, residential streets with noise levels around 40 dBA. Noise levels above 45 dBA at night can disrupt sleep. Examples of moderate-level noise environments are urban residential or semicommercial areas (typically 55 to 60 dBA) and commercial locations (typically 60 dBA). People may consider louder environments adverse, but most will accept the higher levels associated with noisier urban residential or residential-commercial areas (60 to 75 dBA) or dense urban or industrial areas (65 to 80 dBA). Regarding increases in dBA, the following relationships should be noted in understanding this analysis:
Except in carefully controlled laboratory experiments, a change of 1.0 dBA cannot be perceived by humans.
Outside of the laboratory, a 3.0-dBA change is considered a just-perceivable difference. A change in level of at least 5.0 dBA is required before any noticeable change in community response would be expected. An increase of 5.0 dBA is typically considered substantial.
A 10.0-dBA change is subjectively heard as an approximate doubling in loudness and would almost certainly cause an adverse change in community response.
4.13.1.3 Sensitive Noise Receptors
Noise-sensitive land uses are generally considered to include those uses where noise exposure could result in health-related risks to individuals, as well as places where quiet is an essential element of their intended purpose. Residential dwellings are of primary concern because of the potential for increased and Attachment 2 Agenda Report Page 133
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-58 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 prolonged exposure of individuals to both interior and exterior noise levels. Additional land uses such as parks, historic sites, cemeteries, and recreation areas are considered sensitive to increases in exterior noise levels. Schools, churches, hotels, libraries, and other places where low interior noise levels are essential are also considered noise-sensitive land uses.
The Project Area is linear and traverses many different locations throughout the City of Piedmont in northwestern Alameda County. According to the City’s General Plan, the City is generally quiet thus domestic noise sources, such as noise from construction, are a concern in some neighborhoods. However, the General Plan acknowledges that ambient noise in the western portion of the City tends to be higher than the eastern portion due to greater population density and proximity to I-580 (City of Piedmont 2009a).
The nearest noise sensitive receptors to the Project Area are single-family residences, which are located at various distances, with the closest residence approximately 30 feet distant.
4.13.1.4 Vibration Fundamentals
Ground vibration can be measured several ways to quantify the amplitude of vibration produced, including through peak particle velocity (PPV) or root mean square velocity. These velocity measurements measure maximum particle at one point or the average of the squared amplitude of the signal, respectively. Vibration impacts on people can be described as the level of annoyance and can vary depending on an individual’s sensitivity. Generally, low-level vibrations may cause window rattling but do not pose any threats to the integrity of buildings or structures.
4.13.1.5 Existing Ambient Noise Environment
The Project Area, which is located throughout the City of Piedmont, is impacted by noise sources typical of a small city. It is subject to typical neighborhood noise such as noise generated by traffic, heavy machinery, and day-to-day outdoor activities. Mobile sources of noise, especially cars and trucks, are the most common source of noise in the community.
The American National Standards Institute (ANSI) Standard 12.9-2013/Part 3 Quantities and Procedures for Description and Measurement of Environmental Sound – Part 3: Short-Term Measurements with an Observer Present provides a table of approximate background sound levels in Ldn, daytime Leq, and nighttime Leq, based on land use and population density. The ANSI standard estimation divides land uses into six distinct categories. Descriptions of these land use categories, along with the typical daytime and nighttime levels, are provided in Table 4.13-1. At times, one could reasonably expect the occurrence of periods that are both louder and quieter than the levels listed in the table. ANSI notes, “95% prediction interval [confidence interval] is on the order of ±10 dB.” The majority of the Project Area would be considered ambient noise Category 4.
Attachment 2 Agenda Report Page 134
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-59 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Table 4.13-1. ANSI Standard 12.9-2013/Part 3 A-weighted Sound Levels Corresponding to Land Use and Population Density
Land
Use Land Use Land Use Land Use
Land Use
Typical
Ldn
Daytime
Leq
Nighttime
Leq
1 Noisy
Commercial &
Industrial
Areas and Very
Noisy
Residential
Areas
Very heavy traffic conditions, such
as in busy, downtown commercial
areas; at intersections for mass
transportation or other vehicles,
including elevated trains, heavy
motor trucks, and other heavy
traffic; and at street corners where
many motor buses and heavy
trucks accelerate.
63,840 67 66 58
2 Moderate
Commercial &
Industrial
Areas and
Noisy
Residential
Areas
Heavy traffic areas with conditions
similar to Category 1, but with
somewhat less traffic; routes of
relatively heavy or fast automobile
traffic, but where heavy truck traffic
is not extremely dense.
20,000 62 61 54
3 Quiet
Commercial,
Industrial
Areas and
Normal Urban
& Noisy
Suburban
Residential
Areas
Light traffic conditions where no
mass-transportation vehicles and
relatively few automobiles and
trucks pass, and where these
vehicles generally travel at
moderate speeds; residential areas
and commercial streets, and
intersections, with little traffic,
compose this category.
6,384 57 55 49
4 Quiet Urban &
Normal
Suburban
Residential
Areas
These areas are similar to Category
3, but for this group, the
background is either distant traffic
or is unidentifiable; typically, the
population density is one-third the
density of Category 3.
2,000 52 50 44
5 Quiet
Residential
Areas
These areas are isolated, far from
significant sources of sound, and
may be situated in shielded areas,
such as a small wooded valley.
638 47 45 39
6 Very Quiet
Sparse
Suburban or
rural
Residential
Areas
These areas are similar to Category
4 but are usually in sparse
suburban or rural areas; and, for
this group, there are few if any
nearby sources of sound.
200 42 40 34
Note: ANSI = American National Standards Institute; Ldn = Day-Night Average Sound Level; Leq = Equivalent Noise Level
Source: ECORP Consulting, Inc. 2024f
Attachment 2 Agenda Report Page 135
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-60 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.13.2 Noise (XIII) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Result in generation of a substantial temporary or
permanent increase in ambient noise levels in the
vicinity of the Project in excess of standards
established in the local general plan or noise
ordinance, or applicable standards of other
agencies?
Less Than Significant Impact with Mitigation Incorporated.
As previously described, noise-sensitive land uses are locations where people reside or where the presence of unwanted sound could adversely affect the use of the land. Residences, schools, hospitals, guest lodging, libraries, and some passive recreation areas would each be considered noise sensitive and may warrant unique measures for protection from intruding noise. The Project Area spans many different locations throughout the City of Piedmont in northwestern Alameda County, which is primarily made up of noise-sensitive residential receptors. Virtually all aspects of Project implementation would involve construction activity occurring adjacent to these land uses.
4.13.2.1 Onsite Project Construction Noise
Construction noise associated with the Proposed Project would be temporary and would vary depending on the specific nature of the activities being performed. Noise generated would primarily be associated with the operation of off-road equipment for onsite construction activities as well as construction vehicle traffic on area roadways. Construction noise typically occurs intermittently and varies depending on the nature or phase of construction (e.g., site preparation, excavation, paving). Noise generated by construction equipment, including earth movers, pile drivers, and portable generators, can reach high levels. Typical operating cycles for these types of construction equipment may involve one or two minutes of full power operation followed by three to four minutes at lower power settings. Other primary sources of acoustical disturbance would be random incidents, which would last less than one minute (such as dropping large pieces of equipment or the hydraulic movement of machinery lifts). During construction, exterior noise levels could negatively affect sensitive land uses in the vicinity of the construction site.
The Piedmont City Code Section 12.8, Noise Declared Nuisance, states that loud, unnecessary, and unusual noise which disturbs the peace and quiet of any neighborhood or which causes discomfort or annoyance to any reasonable resident of normal sensitivity is a nuisance and is unlawful. The City Code prohibits construction and demolition between the hours of 6:00 p.m. and 8:00 a.m. Sunday evening through Saturday morning and between 6:00 p.m. and 9:00 a.m. Saturday evening through Sunday morning.
Therefore, the Project would be required to limit construction to the daytime hours as specified in the City Code.
□ □ □
Attachment 2 Agenda Report Page 136
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-61 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 To estimate the worst-case onsite construction noise levels that may occur at the nearest noise-sensitive receptors and in order to evaluate the potential health-related effects (physical damage to the ear) from construction noise, the construction equipment noise levels were calculated using the Roadway Construction Noise Model and compared against the construction‐related noise level threshold established in the Criteria for a Recommended Standard: Occupational Noise Exposure prepared in 1998 by the National Institute for Occupational Safety and Health (NIOSH). A division of the U.S. Department of Health and Human Services, NIOSH identifies a noise level threshold based on the duration of exposure to the source. The NIOSH construction-related noise level threshold starts at 85 dBA for more than 8 hours per day; for every 3-dBA increase, the exposure time is cut in half. This reduction results in noise level thresholds of 88 dBA for more than 4 hours per day, 92 dBA for more than 1 hour per day, 96 dBA for more than 30 minutes per day, and up to 100 dBA for more than 15 minutes per day. For the purposes of this analysis, the lowest, more conservative threshold of 85 dBA Leq is used as an acceptable threshold for construction noise at the nearby sensitive receptors.
It is acknowledged that the majority of construction equipment is not situated at any one location during construction activities, but rather spread throughout the Project Area and at various distances from sensitive receptors. Table 4.13-2 presents the anticipated short-term construction noise levels generated for the necessary equipment for each construction phase.
Table 4.13-2. Construction Average (dBA) Noise Levels at Nearest Receptors (30 Feet Distant) Equipment
Estimated Exterior Construction
Noise Level @ Closest Noise
Sensitive Receptor (dBA Leq)
Construction Noise
Standards (dBA Leq) Exceeds Standards?
Excavation 91.4 85 Yes
Hauling 82.3 85 No
Final Paving 92.2 85 Yes
Notes: Leq = The equivalent energy noise level, is the average acoustic energy content of noise for a stated period of time. Thus, the Leq of a time-varying noise and that of a steady noise are the same if they deliver the same acoustic energy to the ear during exposure. For evaluating community impacts, this rating scale does not vary, regardless of whether the noise occurs during the day or the night.
Source: Federal Highway Administration 2008. Refer to Appendix F for Model Data Outputs.
As shown in Table 4.13-2, Project onsite excavation and paving activities would exceed the NIOSH threshold of 85 dBA Leq at the nearest noise-sensitive receptors. Implementation of Mitigation Measures NOI-1 and NOI-2 would substantially reduce construction-generated noise levels. Noise barriers or enclosures such as that recommended in Mitigation Measure NOI-2 can provide a sound reduction of 35 dBA or greater (Western Electro-Acoustic Laboratory, Inc. 2021), which would be a reduction robust enough to maintain construction noise levels less than 85 dBA. Temporary noise barriers can consist of a solid plywood fence and/or flexible sound curtains, such as an 18-ounce tarp or a 2-inch-thick fiberglass blanket attached to chain link fencing. Therefore, Project construction activities would not expose persons to and generate noise levels in excess of NIOSH health protective standards with implementation of Mitigation Measure NOI-1 and Mitigation Measure NOI-2.
Attachment 2 Agenda Report Page 137
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-62 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.13.2.2 Offsite Project Construction Traffic Noise
Project construction would result in additional traffic on adjacent roadways over the period that construction occurs. According to CalEEMod, which is used to predict the number of construction-related automotive trips, the maximum number of Project construction trips traveling to and from the Project Area during a single construction phase would not be expected to exceed 62 daily trips in total (60 construction worker trips and 2 vendor trips). According to Caltrans Technical Noise Supplement to the Traffic Noise Analysis Protocol, a doubling of traffic on a roadway is required to result in an increase of 3 dB (outside of the laboratory, a 3-dBA change is considered a just-perceivable difference) (Caltrans 2013).
While Project construction workers would instigate their trip to the Project Area from differing locations, the addition of 62 daily trips spread over the various roadway facilities that would be used to reach the Project Area would not result in a doubling of traffic on any of these roadway facilities, and therefore its contribution to existing traffic noise would not be perceptible. Additionally, it is noted that construction is temporary, and construction-related trips would cease upon completion of construction.
4.13.2.3 Project Operational Noise
The Project proposes necessary upgrades to the City’s sanitary sewer system including the rehabilitation of sanitary sewer mains and their associated lower sewer laterals. The Project would not expand its capacity in a manner that would induce population or employment growth. Once upgrades are complete, the sanitary sewer system would not be a greater source of operational noise beyond current conditions.
For the reasons listed above, this impact is less than significant.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Result in generation of excessive ground-borne
vibration or ground-borne noise levels?
Less Than Significant Impact.
4.13.2.4 Construction Vibration Analysis
Excessive groundborne vibration impacts result from continuously occurring vibration levels. Increases in groundborne vibration levels attributable to the Proposed Project would be primarily associated with short-term, construction-related activities. Construction in the Project Area would have the potential to result in varying degrees of temporary groundborne vibration, depending on the specific construction equipment used and the operations involved. Ground vibration generated by construction equipment spreads through the ground and diminishes in magnitude with increases in distance.
Construction-related ground vibration is normally associated with impact equipment such as pile drivers, jackhammers, and the operation of some heavy-duty construction equipment, such as dozers and trucks.
Vibration decreases rapidly with distance, and it is acknowledged that construction activities would occur □ □ □
Attachment 2 Agenda Report Page 138
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-63 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 throughout the Project Area and would not be concentrated at the point closest to sensitive receptors.
Groundborne vibration levels associated with construction equipment are summarized in Table 4.13-3.
Table 4.13-3. Representative Vibration Source Levels for Construction Equipment Equipment Type Peak Particle Velocity at 25 Feet
(inches per second)
Large Bulldozer 0.089
Pile Driver 0.170
Loaded Trucks 0.076
Hoe Ram 0.089
Jackhammer 0.035
Small Bulldozer/Tractor 0.003
Vibratory Roller 0.210
Source: Federal Transit Administration (FTA) 2018
The Piedmont City Code does not have an ordinance for vibration associated with temporary construction or demolition. However, a discussion of construction vibration is included for full disclosure purposes. For comparison purposes, Caltrans recommended standard of 0.3 inches per second peak particle velocity (PPV) with respect to the prevention of structural damage for older residential buildings is used as a threshold. This is also the level at which vibrations may begin to annoy people in buildings (Caltrans 2020).
Based on the representative vibration levels presented for various construction equipment types in Table
4.13-3 and the construction vibration assessment methodology published by the FTA (2018), it is possible to estimate the potential project construction vibration levels. The FTA provides the following equation:
[PPVequip = PPVref x (25/D)1.5]
Table 4.13-4 presents the expected Project related vibration levels at a distance of 30 feet.
Table 4.13-4. Construction Vibration Levels at 30 Feet
Receiver PPV Levels (in/sec)1
Peak
Vibration Threshold Exceed Threshold Large Bulldozer,
Caisson Drilling,
& Hoe Ram
Loaded
Trucks Jackhammer Pile Driver Vibratory Roller
0.0677 0.0578 0.0266 0.1293 0.1598 0.1598 0.3 No
Note: in/sec = inches per second; PPV = Peak Particle Velocity Source: California Department of Transportation (Caltrans) 2020; Federal Transit Administration (FTA) 2018 Attachment 2 Agenda Report Page 139
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-64 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 As shown in Table 4.13-3, vibration as a result of construction activities would not exceed 0.3 PPV. Thus, Project construction would not exceed the recommended threshold. This impact is less than significant.
4.13.2.5 Project Operational Vibration
Project operations would not include the use of any stationary equipment that would result in excessive groundborne vibration levels. Therefore, the Project would result in no groundborne vibration impacts during operations. No impact would occur.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) For a Project located within the vicinity of a
private airstrip or an airport land use plan or,
where such a plan has not been adopted, within
two miles of a public airport or public use airport,
would the Project expose people residing or
working in the Project Area to excessive noise
levels?
No Impact.
The Project Area is located approximately 5.5 miles northwest of Oakland International Airport. The Project Area is located outside of the noise contours of this airport facility (Oakland Airport 2006). Aircraft noise does not significantly impact the City of Piedmont and the Proposed Project would not expose people visiting or working on the Project Area to excess airport noise levels. Therefore, no impact would occur.
4.13.3 Mitigation Measures
NOI-1: The Project improvement and construction plans will include the following requirements for construction activities:
Construction contacts must specify that all construction equipment, fixed or mobile, shall be equipped with properly operating and maintained mufflers and other staterequired noise attenuation devices. A sign, legible at a distance of 50 feet, shall be posted at the Project construction site providing a contact name and a telephone number where residents can inquire about the construction process and register complaints. This sign shall indicate the dates and duration of construction activities. In conjunction with this required posting, a noise disturbance coordinator will be identified to address construction noise concerns received. The coordinator shall be responsible for responding to any local complaints about construction noise. When a complaint is received, the disturbance coordinator shall notify the City within 24 hours of the complaint and determine the cause of the noise complaint (starting too early, malfunctioning □ □ □
Attachment 2 Agenda Report Page 140
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-65 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 muffler, etc.) and shall implement reasonable measures to resolve the complaint, as deemed acceptable by the City. All signs posted at the construction site shall include the contact name and the telephone number for the noise disturbance coordinator. Identification of construction noise reduction methods. These reduction methods may include shutting off idling equipment (5 minutes), installing temporary acoustic barriers around stationary construction noise sources, maximizing the distance between construction equipment staging areas and occupied residential areas, and using electric air compressors and similar power tools. During construction, stationary construction equipment shall be placed such that emitted noise is directed away from sensitive noise receivers. Per Piedmont City Code Section 12.8, Noise Declared Nuisance, construction and demolition shall be prohibited between the hours of 6:00 p.m. and 8:00 a.m. Sunday evening through Saturday morning and between 6:00 p.m. and 9:00 a.m. Saturday evening through Sunday morning.
NOI-2: In order to reduce construction noise, during the excavation and paving phases, all other portable stationary noise sources (e.g., excavators, compactors, generators, compressors, etc.) will be screened from sensitive receptors in a manner that breaks the line of sight between the construction equipment and these residences. Temporary noise barriers/enclosures shall have a sound transmission class (STC) of 10 or greater in accordance with American Society for Testing and Materials Test Method E90, or at least 2 pounds per square foot to ensure adequate transmission loss characteristics. The temporary noise barrier can consist of a solid plywood fence at least 7/16-inch in thickness and/or flexible sound curtains, such as an 18-ounce tarp or a 2-inch-thick fiberglass blanket, attached to chain link fencing. The length, height, and location of the temporary noise barrier shall be adequate to assure proper acoustical performance. Specifically, the barrier must completely break the line of sight between the construction site and adjacent residences along the linear Project Site, must be free of degrading holes or gaps and must not be flanked by nearby reflective surfaces. All noise control barrier walls/enclosures shall be designed to preclude structural failure due to such factors as winds, shear, shallow soil failure, earthquakes, and erosion.
4.14 Population and Housing
4.14.1 Environmental Setting
The Proposed Project alignment spans a distance of approximately 17,626 linear feet, among various sewer lines within the City of Piedmont, California. U.S. Census data reports that population growth in the City of Piedmont, has decreased 4.1 percent from 11,277 in 2020 to 10,811 in 2022 (US Census Bureau 2022). According to the Department of Finance (DOF), in 2023 there are 3,979 houses available with a vacancy rate of 3.2% (DOF 2023).
Attachment 2 Agenda Report Page 141
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-66 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.14.2 Population and Housing (XIV) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Induce substantial unplanned population growth
in an area, either directly (for example, by
proposing new homes and businesses) or
indirectly (for example, through extension of
roads or other infrastructure)?
No Impact.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. The pipeline wouldn’t increase service capacity or extend service to areas that do not currently have service. Upon completion of the Proposed Project, the Project Area would be returned to existing conditions. Implementation of the Proposed Project would not induce substantial population growth in the area. Furthermore, minimal operation and maintenance of the pipeline would be required and no permanent employees would be hired as a result of the Proposed Project. No impact would occur and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Displace substantial numbers of people or
existing housing, necessitating the construction
of replacement housing elsewhere?
No Impact.
As described above, the Proposed Project will replace the existing pipeline within the roadway alignment and would not involve land outside the roadway ROW. The Proposed Project alignment would not displace any existing housing and therefore, no impact would occur and no mitigation is required.
4.14.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.15 Public Services
4.15.1 Environmental Setting
4.15.1.1 Police Services
The Piedmont Police Department (PPD) provides police protection services to Piedmont. The PPD’s only police station is located at 403 Highland Avenue.
□ □ □
□ □ □
Attachment 2 Agenda Report Page 142
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-67 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 The Piedmont General Plan Community Services and Facilities Element indicates the PPD has a response time goal of three minutes or less for ninety percent of calls (City of Piedmont 2009e).
4.15.1.2 Fire Services
The Piedmont Fire Department (PFD) provides fire protection and emergency medical services for the City of Piedmont. The PFD operates a single fire station including two Type 1 engines, one Type 6 engine, one 65-foot aerial ladder truck, two ambulances, one utility truck, and one command vehicle. The PFD is organized into two divisions: Fire Prevention Bureau and Operations and Training. Both divisions are under the Office of the Fire Chief. The PFD’s only fire station is located at 120 Vista Avenue.
The Piedmont General Plan Community Services and Facilities Element indicates the PFD has a response time goal of three minutes or less for ninety percent of calls (City of Piedmont 2009e).
4.15.1.3 Schools
The Piedmont Unified School District (PUSD) operates three elementary schools (grades K-5), one middle school (grades 6-8), one traditional high school, one alternative high school, and one adult education (PUSD 2023).
4.15.1.4 Parks
The City of Piedmont Recreation Department (PRD) administers recreation centers and programs and maintains some of the parks within city limits. According to the General Plan Parks, Recreation, and Open Space Element, Piedmont has approximately 59 acres of parkland, of which approximately 44 acres are city-owned and operated parks, approximately 6 acres are operated by the City of Oakland but are within the city limits, and approximately 8.5 acres are school recreational facilities (Piedmont 2009e).
4.15.2 Public Services (XV) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) result in substantial adverse physical impacts associated with the provision of new or physically altered
governmental facilities, need for new or physically
altered governmental facilities, the construction of
which could cause significant environmental impacts, in order to maintain acceptable service ratios, response
times or other performance objectives for any of the
public services:
Fire Protection?
Police Protection?
□
□
□
□ □
□ □
□ □
Attachment 2 Agenda Report Page 143
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-68 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Would the Project:
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Schools?
Parks?
Other Public Facilities?
Less Than Significant Impact With Mitigation Incorporated.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. The proposed pipeline would be maintained by the City and would not require public services beyond existing conditions. During construction, partial roadway closures would be required. The City would consult with affected property owners as to what specific requirements could apply to the use of their property during construction. TRANS-1 requires preparation and implementation of a traffic management plan to ensure access along the project roadways is maintained for both emergency and residential use during construction. With implementation of TRANS-1 the Proposed Project would have a less than significant impact on public services.
Mitigation Measures
See Section 4.17, Transportation, for Mitigation Measure TRANS-1.
4.16 Recreation
4.16.1 Environmental Setting
As mentioned above in Section 4.15.1.4, Public Services-Parks, the PRD administers recreation centers and programs and maintains some of the parks within the city limits. According to General Plan Parks, Recreation, and Open Space Element, Piedmont has approximately 59 acres of parkland, of which approximately 44 acres are city-owned and operated parks, approximately 6 acres are operated by the City of Oakland but are within the city limits, and approximately 8.5 acres are school recreational facilities (Piedmont 2009c).
There are no regional parks within Piedmont. However, Piedmont is within the East Bay Regional Parks District (EBRPD), a special district that owns and manages 55 parks encompassing 91,000 acres in Alameda and Contra Costa Counties. The EBRPD facilities in the vicinity of Piedmont include Lake Temescal, Anthony Chabot Regional Park, and Redwood Regional Park (in Oakland), and Tilden Regional Park (in Berkeley). In addition, Piedmont residents may also recreate at Lake Merritt, Joaquin Miller, and Knowland parks, which are facilities owned and operated by the City of Oakland (City of Piedmont 2009e). □
□
□
□
□
□
Attachment 2 Agenda Report Page 144
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-69 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.16.2 Recreation (XVI) Materials Checklist
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Increase the use of existing neighborhood and
regional parks or other recreational facilities such
that substantial physical deterioration of the
facility would occur or be accelerated?
No Impact.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. The Proposed Project would not increase city population and would be implemented consistent with all adopted General Plan policies and implementation measures.
Thus, the Proposed Project would not increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated. There would be no impact.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Include recreational facilities or require the
construction or expansion of recreational
facilities, which might have an adverse physical
effect on the environment?
No Impact.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. The Proposed Project would not increase city population and would be implemented consistent with all adopted General Plan policies and implementation measures.
Thus, the Proposed Project would not increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated. There would be no impact.
4.16.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.17 Transportation
4.17.1 Environmental Setting
The City of Piedmont is in northwest Alameda County. The city has a land area of about 1.7 square miles with mostly hilly terrain throughout. The Project area is west of SR 13, north of I-580, south of Moraga Avenue, and east of Broadway Avenue. The Project includes rehabilitation of the sewer mains in several □ □ □
□ □ □
Attachment 2 Agenda Report Page 145
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-70 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 areas of the City of Piedmont. The Proposed Project is not intended to increase service capacity in the City of Piedmont system and, as such, would not directly or indirectly result in future growth and development not served by existing facilities.
4.17.2 Transportation (XVII) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Conflict with a program, plan, ordinance, or
policy addressing the circulation system,
including transit, roadway, bicycle and pedestrian
facilities?
Less Than Significant Impact With Mitigation Incorporated.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. No long-term modifications to roadway features are Proposed that would conflict with adopted policies, plans, or programs regarding alternative transportation. Traffic disruption during project construction, however, may adversely impact access to roadways for alternative transportation. This is considered short-term but potentially significant impact. Implementation of Mitigation Measure TRANS-1 will reduce this impact to less than significant with mitigation incorporated.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Conflict or be inconsistent with CEQA Guidelines
Section 15064.3, subdivision (b)?
No Impact.
CEQA Guidelines Section 15064.3 subdivision (b) addresses the criteria for analyzing transportation impacts and establishes the Vehicle Miles Traveled (VMT) metric as the most appropriate measure of transportation impacts in a CEQA document. The Proposed Project is a pipeline infrastructure project and will not result in a permanent increase in VMT. Consequently, there would be no impact and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Substantially increase hazards due to a geometric
design feature (e.g., sharp curves or dangerous
intersections) or incompatible uses (e.g., farm
equipment)?
□ □ □
□ □ □
□ □ □
Attachment 2 Agenda Report Page 146
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-71 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 No Impact.
The Proposed Project involves installation of a below-ground sewer pipeline. After Project installation, the site would return to existing conditions above-ground. No modifications to roadway features are proposed as part of the Project. The Project would not introduce transportation hazards and related impacts. No impact would occur.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Result in inadequate emergency access?
Less than Significant with Mitigation Incorporated.
Traffic disruption during Project construction would be short-term but may adversely affect access to roadways within the Proposed Project Area. This is considered a short-term but potentially significant impact. Implementation of Mitigation Measure TRANS-1 will reduce this impact to less than significant with mitigation incorporated.
4.17.3 Mitigation Measures
TRANS-1: Construction Traffic Management Plan. Prior to commencing construction of the Proposed Project, a construction traffic management plan (Traffic Plan) shall be prepared by the Contractor, in coordination with the City. The management plan shall be detailed and comprehensive to adequately mitigate potential conflicts between baseline and construction-related traffic. The Traffic Plan will include, at a minimum, the following measures:
A. Adequate off-street worker parking shall be provided along the pipeline route.
B. A flagman or signal-controlled one-way traffic-control operation shall be provided where two-way traffic operation is impractical or unsafe.
C. Roadway disturbances shall be minimized during non-working hours; open trenches shall be covered with steel plates or by the use of temporary backfill during non-working hours.
D. Temporary steel plate trench crossings shall be provided as needed to maintain access to homes, farms, and businesses.
E. Construction sites shall be posted with appropriate warning signage at least one week prior to construction to allow local residents to select an alternative travel route.
F. Construction staging areas shall be provided to minimize storage of equipment and materials in the traffic lanes.
□ □ □
Attachment 2 Agenda Report Page 147
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-72 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 G. All paved surfaces disturbed during construction shall be repaved when work is complete.
H. The Contractor shall provide traffic control and diversion plans for review and approval by each appropriate jurisdiction.
I. To minimize delays in emergency response during project construction, emergency providers shall be notified in advance. Police, fire protection, and ambulance services shall be notified in advance of the times, duration, and location of construction activities throughout the project’s construction process.
4.18 Tribal Cultural Resources
ECORP Consulting, Inc. was retained to conduct a cultural resources inventory of the Proposed Project and assisted with tribal coordination efforts. The information provided below is an abridged version of the Cultural Resources Inventory Report and is included here to provide a brief context of the potential cultural resources in the Project Area. Due to the sensitive nature of cultural resources and their records and documentation, which are restricted from public distribution by state and federal law, the IS/MND appendices do not include the report; however, all pertinent information necessary for impact determinations is included in this section.
4.18.1 Environmental Setting
Ethnographically, the Project area is in the southern portion of the northern half of the Costanoan territory. The territory extended from the Carquinez Strait from the north down to Carmel in the south.
Native Californians settled in the Menlo Park area, approximately 21 miles northwest of the Project area, between 14,000 and 6,000 years ago. Subsequent Penutian peoples migrated into central California around 4,500 years ago and were firmly settled around San Francisco Bay by 1,500 years ago. The people who lived between the Carquinez Strait and the Monterey area when Europeans first arrived were referred to as the Ohlone by ethnographers, although they are often referred to by the name of their linguistic group, Costanoan, which was a name incorrectly bestowed by the Spanish.
The word Costanoan comes from the Spanish word Costanos meaning coast people which was given to the tribes in 1770 when the first mission was established in their territory. The Costanoan represented a group of people who spoke eight separate languages, but whose dialects were most similar to their geographic neighbors. In all, the Costanoan consisted of approximately 50 different tribelets or politically autonomous nations, each having their own village with an average of 200 inhabitants. Today, the Ohlone are represented by autonomous tribes like the Muwekma, Amah Mutsun, and Tamien Nation.
The Ohlone and neighboring Miwok to the east were placed within the Penutian stock since the two languages were more similar than to any of the other surrounding languages. The City of Piedmont is located on the ethnolinguistic boundary of Tamyen/Chochenyo language group.
Tamyen (also written as Thámien in earlier documents or, today, as Tamien), or the Santa Clara language group, is traditionally spoken in the area at the southern end of San Francisco Bay and within the lower Santa Clara Valley. They descended from those who resided at Mission Santa Clara, Mission Santa Cruz, Attachment 2 Agenda Report Page 148
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-73 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 and Mission San Juan Bautista. Contemporary Tamien are direct descendants of Chief Tulum and Yaayaye and others who were taken to Mission Santa Clara. The typical Ohlone household consisted of approximately 15 individuals, and these households would group together, forming villages. Ethnographic studies have documented approximately 40 discrete Ohlone groups, with each typically consisting of 200 to 250 people. The group consisted of a principal village that was occupied year-round; smaller hamlets and resource gathering, and processing locations were occupied intermittently or seasonally. Each group consisted of one or two main villages with smaller surrounding camps. According to early Spanish explorers, the inhabitants were not willing to go outside of their territory because of hostility from neighboring groups. Groups were headed by a single chief who may have been a man or woman, but the responsibility was usually passed down from father to son. The title was usually passed down to the daughter or sister of the chief if there were no male heirs.
The Ohlone villages and temporary campsites within the San Jose area were located near sources of fresh water, and adjacent to the marshlands that once bordered the San Francisco Bay. As with many Native Americans in California, the Ohlone relied on the acorn as a dietary stable. Poles were used to knock acorns from the trees; the acorns were leached with water to remove bitter tannins and then eaten as mush or turned into bread. Other plant resources utilized by the Ohlone included the toyon berries, goose berries, Manzanita berries, elderberries, strawberries, buckeye, California laurel, wild carrots, wild grapes, wild onion, cattail, amole, clover, and chuchupate. Game animals that the Ohlone hunted included antelope, black-tailed deer, Roosevelt elk, and marine mammals, as well as smaller animals like waterfowl, fish, mollusks, skunk, rabbit, raccoon, squirrel, and dog. The Bay Area’s natural resources provided sustenance and raw materials for clothing, shelter, medicine, cordage, twined basketry, bone tools, and boats, the latter of which was also used to obtain foodstuffs.
Based on archaeological evidence, between 2,500 and 1,000 years ago, many of the bay shore midden sites grew into mounds and were inhabited off and on until the Spanish arrived. These midden mounds supported stable villages with mortuaries. Flexed burials with occasional cremations were the main interment custom during this time period. A shift in village and burial practices occurred approximately 1,500 years ago, as cemeteries were established away from the main village site and involved extended burials. There were more frequent seasonal shifts between villages during this time.
Traditional oral narratives throughout west-central California regarding the nature and creation of the universe share a common over-arching theme. They relay how modern events occurred and places in nature gained importance through the actions of a prehuman race of supernatural beings from a former mythological age. The specific narratives state that each group is linked to their local landscape, which served as a charter establishing that group’s origins and provided them with rights of ownership to their territory. Other stories discuss how flooding or wildfires were a consequence of rule breaking or greed.
Seven Spanish missions were founded in Ohlone territory between 1776 and 1797. While living within the mission system, the Ohlone commingled with other groups, including the Yokuts, Miwok, and Patwin.
Members of the Puichon tribelet went to Mission San Francisco between 1781 and 1794 and Mission Santa Clara from 1781 to as late as 1805. Mission life was devastating to the Ohlone population. When the first mission was established in Ohlone territory in 1776, the Ohlone population was estimated to be 10,000. By 1832, and because of introduced disease, harsh living conditions, and reduced birth rates, the Attachment 2 Agenda Report Page 149
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-74 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Ohlone numbered less than 2,000. The Mexican government began to earnestly secularize the mission lands in 1834 and divided the former mission land among loyal Mexican subjects. The Ohlone opted to remain in their ancestral territory and were considered squatters. This led to several multi-ethnic Native American communities comprised of Northern Valley Yokuts, Plains Miwok, Coast Miwok, Patwin, and Chochenyo individuals within the Ohlone territory.
Ohlone recognition and assertion began to move to the forefront during the early 20th century. This movement was enforced by legal suits brought against the U.S. Government by the Indians of California between 1928 to 1964 for reparations due to them for the loss of traditional lands. The Ohlone participated in the formation of political advocacy groups, which brought attention to the community and resulted in a re-evaluation of the rights due to its member. In recent years, the Ohlone have become increasingly organized as a political unit and developed an active interest in preserving their ancestral heritage. Many Ohlone are active in maintaining their traditions and advocating for Native American issues.
4.18.2 Regulatory Setting
4.18.2.1 Assembly Bill 52
Effective July 1, 2015, AB 52 amended CEQA to require that: 1) a lead agency provide notice to those California Native American tribes that requested notice of projects proposed by the lead agency; and 2) for any tribe that responded to the notice within 30 days of receipt with a request for consultation, the lead agency must consult with the tribe. Topics that may be addressed during consultation include Tribal Cultural Resources (TCRs), the potential significance of project impacts, type of environmental document that should be prepared, and possible mitigation measures and project alternatives.
Pursuant to AB 52, Section 21073 of the PRC defines California Native American tribes as “a Native American tribe located in California that is on the contact list maintained by the NAHC for the purposes of Chapter 905 of the Statutes of 2004.” This includes both federally and non-federally recognized tribes.
Section 21074(a) of the PRC defines TCRs for the purpose of CEQA as:
1) Sites, features, places, cultural landscapes (geographically defined in terms of the size and scope), sacred places, and objects with cultural value to a California Native American tribe that are either of the following:
a. included or determined to be eligible for inclusion in the California Register of Historical Resources; and/or
b. included in a local register of historical resources as defined in subdivision (k) of Section 5020.1; and/or
c. a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. In applying the criteria set forth in subdivision (c) of Section 5024.1 for the Attachment 2 Agenda Report Page 150
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-75 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 purposes of this paragraph, the lead agency shall consider the significance of the resource to a California Native American tribe.
Because criteria a and b also meet the definition of a Historical Resource under CEQA, a TCR may also require additional consideration as an Historical Resource. TCRs may or may not exhibit archaeological, cultural, or physical indicators.
Recognizing that California tribes are experts in their tribal cultural resources and heritage, AB 52 requires that CEQA lead agencies provide tribes that requested notification an opportunity to consult at the commencement of the CEQA process to identify TCRs. Furthermore, because a significant effect on a TCR is considered a significant impact on the environment under CEQA, consultation is used to develop appropriate avoidance, impact minimization, and mitigation measures.
4.18.3 SWRCB Tribal Consultation
Per SWRCB requirements, ECORP sent letters on February 20, 2024 via certified mail to each of the contacts provided by the NAHC. The letters provided a Project description and a map depicting the Project Area. ECORP, through experience with projects in the vicinity, learned that the Confederated Villages of Lisjan Nation had a new address. ECORP sent a letter via certified mail to this new address.
On February 20, 2024, ECORP sent letters via certified mail and email to the potentially interested tribes that were identified by the NAHC. ECORP sent follow up emails on March 7, 2024. ECORP received a response from the Amah Mutsun Tribal Band of San Juan Bautista, recommending cultural sensitivity training and requested a Native American Monitor be present during earth moving activities. ECORP received a response from the Confederated Villages of Lisjan Nation, requesting copies of the records search results and the final report. ECORP received a response from the Ohlone Indian Tribe, requesting a copy of the record search results and the NAHC contact list. One letter to the Ohlone Indian Tribe was undeliverable by email
4.18.4 Summary of Consultation Under AB 52
Consultation letters under AB 52 were provided to interested tribes on September 20, 2024 addressing their initial requests for information. Contacts included the Amah Mutsun Tribal Band of Mission San Juan Bautista, Indian Canyon Mutsun Band of Costanoan, Confederated Villages of Lisjan Nation, Muwekma Ohlone Indian Tribe of the SF Bay Area, Northern Valley Yokut.Ohlone Tribe, the Ohlone Indian Tribe, Costanoan Rumsen Carmel Tribe, and Wuksachi Indian Tribe/Eshom Valley Band. The City of Piedmont did not receive a response from any of the listed tribes. .
Attachment 2 Agenda Report Page 151
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-76 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
4.18.5 Tribal Cultural Resources (XVIII) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Cause a substantial adverse change in the
significance of a tribal cultural resource, defined
in Public Resources Code Section 21074 as either
a site, feature, place, cultural landscape that is
geographically defined in terms of the size and
scope of the landscape, sacred place, or object
with cultural value to a California Native
American tribe, and that is:
i) Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in
Public Resources Code Section 5020.1(k), or
ii) A resource determined by the lead agency, in
its discretion and supported by substantial
evidence, to be significant pursuant to
criteria set forth in subdivision (c) of Public
Resources Code Section 5024.1. In applying
the criteria set forth in subdivision (c) of
Public Resources Code Section 5024.1, the
lead agency shall consider the significance of
the resource to a California Native American
Tribe.
Less Than Significant With Mitigation Incorporated.
As conveyed in the Historic Property Identification Report conducted by ECORP Consulting, Inc., the record search determined that 160 previously recorded pre-contact and historic-era cultural resources are located within 1 mile of the Project Area. Of these 160 resources, two are believed to be associated with Native American occupation of the vicinity, and 158 are historic-era sites. There are no previously recorded resources within the Project site. The Project Site has not been identified as either a site, feature, place, cultural landscape, sacred place, or object with cultural value to a California Native American tribe.
However, unanticipated, and accidental discovery of California Native American TCRs are possible during Project implementation, especially during excavation, and have the potential to impact unique cultural resources.
As mentioned above, per SWRCB requirements, ECORP sent letters on February 20, 2024 via certified mail to each of the contacts provided by the NAHC. The Amah Mutsun Tribal Band of San Juan Bautista responded by recommending cultural sensitivity training and requested a Native American Monitor be present during earth moving activities. Additionally, a response came from the Confederated Villages of Lisjan Nation, requesting copies of the records search results and the final report. ECORP also received a □ □ □
□ □ □
Attachment 2 Agenda Report Page 152
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-77 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 response from the Ohlone Indian Tribe, requesting a copy of the record search results and the NAHC contact list.
Consultation letters under AB 52 were provided to interested tribes on September 20, 2024 addressing their initial requests for information. Contacts included the Amah Mutsun Tribal Band of Mission San Juan Bautista, Indian Canyon Mutsun Band of Costanoan, Confederated Villages of Lisjan Nation, Muwekma Ohlone Indian Tribe of the SF Bay Area, Northern Valley Yokut.Ohlone Tribe, the Ohlone Indian Tribe, Costanoan Rumsen Carmel Tribe, and Wuksachi Indian Tribe/Eshom Valley Band. The City of Piedmont did not receive a response from any of the listed tribes.
Therefore, with implementation of mitigation measure CUL-1 and CUL-2, impacts to tribal cultural resources to a less than significant level.
4.18.6 Mitigation Measures
Implement Mitigation Measures CUL-1 and CUL-2.
4.19 Utilities and Service Systems
4.19.1 Environmental Setting
4.19.1.1 Water Service
Water service to the City of Piedmont is provided by EBMUD, a privately owned utility. EBMUD is responsible for service connections and water delivery to most of Alameda County and much of Contra Costa County. Approximately 1.4 million people are currently served by EBMUD’s water system in a 332- square mile area extending from Crockett on the north, southward to San Lorenzo and portions of Hayward (encompassing the major cities of Oakland and Berkeley), eastward from San Francisco Bay to Walnut Creek, and south through the San Ramon Valley (including Alamo, Danville, and San Ramon) (EBMUD 2020).
4.19.1.2 Wastewater
As described in Section 2.1 Project Background, the City of Piedmont owns and maintains its own sewerage collection system. The system was developed by the Piedmont Sanitary District shortly after the City’s incorporation. There are 47 miles of collection pipes, ranging in size from 6 inches to 21 inches in diameter built mainly between the years of 1900 to 1940. Wastewater collected from Piedmont is discharged through the City of Oakland to EBMUD Special District No. 1 interceptor, where the interceptor transports the flows to the EBMUD Main Wastewater Treatment Plant (MWWTP). After providing secondary treatment, the MWWTP discharges through a submerged outfall to the San Francisco Bay (EBMUD 2023).
Attachment 2 Agenda Report Page 153
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-78 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Solid Waste
The City of Piedmont contracts with Republic Services which is a waste disposal company whose services include non-hazardous solid waste collection, waste transfer, and waste disposal, recycling and energy services.
4.19.1.3 Electricity and Natural Gas
Telecommunication services in Piedmont are provided by private companies, including AT&T and Comcast Cable which provides Internet, phone, and television.
AVA, formerly East Bay Community Energy, supplies electricity to Piedmont using transmission infrastructure operated and maintained by Pacific Gas & Electric (PG&E). PG&E also provides natural gas service to Piedmont.
4.19.2 Utilities and Service Systems (XIX) Environmental Checklist and Discussion Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Require or result in the relocation or construction
of new or expanded water, wastewater treatment
or storm water drainage, electric power, natural
gas, or telecommunications facilities, the
construction or relocation of which could cause
significant environmental effects?
Less Than Significant Impact.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method and would not require new or expanded water or wastewater facilities. Therefore, a less than significant impact would occur and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Have sufficient water supplies available to serve
the Project and reasonably foreseeable future
development during normal, dry, and multiple
dry years?
No Impact.
The Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. The Proposed Project would be operated by the City and no new or expanded water demand is associated with the Proposed Project. Therefore, no impact would occur and no mitigation is required.
□ □ □
□ □ □
Attachment 2 Agenda Report Page 154
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-79 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Result in a determination by the wastewater
treatment provider, which serves or may serve
the Project that it has adequate capacity to serve
the Project’s projected demand in addition to the
provider’s existing commitments?
No Impact.
As discussed previously, the Proposed Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe bursting method. The Proposed Project would actually enhance the wastewater capacity to better serve the community of Piedmont. Any impact would be less than significant and no mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Generate solid waste in excess of state or local
standards, or in excess of the capacity of local
infrastructure, or otherwise impair the attainment
of solid waste reduction goals?
Less Than Significant Impact.
The Proposed Project would be installed using the pipe bursting method. This process involves leaving the existing sewer mains and laterals in place, thus minimizing waste generation. Construction activities will generate limited amounts of green waste, asphalt, concrete, and miscellaneous construction debris.
No recycling or solid waste disposal would be required for operation and maintenance of the Proposed Projects. Contractors would be responsible for disposing of construction-related debris in local construction-material dumpsters. A less than significant impact would occur. No mitigation is required.
Would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
No Impact.
As previously described above the Proposed Project would be installed via the pipe bursting method, and no recycling or waste disposal would be required for operation and maintenance of the Proposed Project.
The City’s contractors would be responsible for disposing of construction-related debris in local □ □ □
□ □ □
□ □ □
Attachment 2 Agenda Report Page 155
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-80 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 construction-material dumpsters and insuring compliance with all federal, state, and local statues and regulations related to solid waste. Therefore, no impact would occur and no mitigation is required.
4.19.3 Mitigation Measures
No significant impacts were identified and no mitigation measures are required.
4.20 Wildfire
4.20.1 Environmental Setting
Typically, the California fire season extends from spring to late fall. Fire conditions arise from a combination of hot weather, an accumulation of vegetation, and low moisture content in the air. These conditions, when combined with high winds and years of drought, increase the potential for wildfire to occur.
The southeastern area of the City of Piedmont is in a Very High Fire Hazard Severity Zone (VHFHSZ) in a Local Responsibility Area (LRA). There is no land in a State Responsibility Area within the City. A portion of the Proposed Project on La Salle Avenue borders portions of the VHFHSZ in the City.
4.20.2 Wildfire (XX) Environmental Checklist and Discussion If located in or near state responsibility areas or
lands classified as very high fire hazard severity
zones, would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Substantially impair an adopted emergency
response plan or emergency evacuation plan?
Less Than Significant Impact With Mitigation.
A portion of the Proposed Project Area is designated as Very High fire severity zone. However, the project will be constructed entirely within ROW, front or rear property lines to improve sewer infrastructure. While the Project Area is within fire severity designated zone, construction activities will not occur on vegetated areas prone to fire. As an infrastructure improvement project located underneath roadways, the site will return to its preconstruction state after project completion. Therefore, there will be no change to the local population or development.
Additionally, according to the City of Piedmont’s Environmental Hazards Element, there are no formally designated evacuation routes in Piedmont. In the event of an emergency, the evacuation routes are designated by the Police Chief and the Public Works Director based on the nature of the emergency and the direction or movement of the threat. The project will however implement Mitigation Measure TRANS-1 which requires a Traffic Management Plan to be prepared by the contractor. Therefore, with implementation of Mitigation Measure TRANS-1, this impact would be less then significant. □ □ □
Attachment 2 Agenda Report Page 156
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-81 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 If located in or near state responsibility areas or
lands classified as very high fire hazard severity
zones, would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose
Project occupants to, pollutant concentrations
from, a wildfire or the uncontrolled spread of a
wildfire?
No Impact.
Although the Proposed Project borders an area that is in an LRA classified Very High, the Proposed Project does not exacerbate an existing condition by the addition of structures, machinery, people, or recreational opportunities that would encourage the use of flammable materials or create situations that could lead to increase fire risk. The pipeline will be entirely underground, and as an infrastructure improvement project underneath roadway, the site will be returned to its pre-construction state after project completion. There will be no change to the local population or increase in development associated with the Project that would increase fire risk to the local community. Consequently, the Project would not exacerbate wildfire risks or expose people to pollutant concentrations. No impact would occur, and no mitigation is required.
If located in or near state responsibility areas or
lands classified as very high fire hazard severity
zones, would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Require the installation or maintenance of
associated infrastructure (such as roads, fuel
breaks, emergency water sources, power lines or
other utilities) that may exacerbate fire risk or
that may result in temporary or ongoing impacts
to the environment?
No Impact.
As discussed in item b), the Proposed Project does not exacerbate fire risk under existing conditions. The Proposed Project does not include installation or maintenance of associated structures (i.e., roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment. There would be no impact and no mitigation would be required.
□ □ □
□ □ □
Attachment 2 Agenda Report Page 157
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-82 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 If located in or near state responsibility areas or
lands classified as very high fire hazard severity
zones, would the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
No Impact.
See discussion in items b) and c). The Project would not expose people or structures to significant risks, including downslope or downstream flooding or landslides, because of runoff, post-fire slope instability, or drainage changes. Therefore, there would be no new impact as a result of the Proposed Project.
4.21 Mandatory Findings of Significance
4.21.1 Mandatory Findings of Significance (XXI) Environmental Checklist and Discussion
Does the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Have the potential to substantially degrade the
quality of the environment, substantially reduce
the habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below selfsustaining levels, threaten to eliminate a plant or animal community, substantially reduce the
number or restrict the range of a rare or
endangered plant or animal or eliminate
important examples of the major periods of
California history or prehistory?
Less Than Significant Impact With Mitigation Incorporated.
As stated previously in Section 4.4, Biological Resources, no significant impacts were identified to the habitat of wildlife species or population, on any plant or animal community, and would not restrict the range of a rare or endangered plant or animal. Furthermore, as stated above in Section 4.5, Cultural Resources, with the implementation of proposed Mitigation Measures CUL-1 and CUL-2, development of the Proposed Project would not result in significant impacts to Cultural Resources. □ □ □
□ □ □
Attachment 2 Agenda Report Page 158
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-83 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Does the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
b) Have impacts that are individually limited, but
cumulatively considerable? (“Cumulatively
considerable” means that the incremental effects
of a project are considerable when viewed in
connection with the effects of past projects, the
effects of other current projects, and the effects
of probable future projects)?
Less Than Significant Impact.
Project impacts would not be cumulatively considerable. No mitigation is required relevant to potential cumulative impacts.
For natural resource subjects (Aesthetics, Agriculture and Forest Resources, Biological Resources, Cultural Resources, Geology and Soils, Hydrology and Water Quality, and Mineral Resources), there would be no cumulative effects because all impacts would be less than significant or would be reduced to less than significant with mitigation incorporated. The Proposed Project involves the rehabilitation of existing sewer pipeline to increase flow and improve the distribution system reliability. The Project Area would be returned to pre-project conditions after completion of construction. In addition, the project would temporarily involve minimal hazardous materials use associated with construction and would not result in a cumulative effect on the environment.
The nature of the Proposed Project would not induce population growth or result in the development of new housing or employment-generating uses. Therefore, the Proposed Project would not result in a cumulative effect regarding increased demand or expansion for services or utilities. Furthermore, there are no approved or planned projects within proximity to the Proposed Project that would contribute to cumulative effects.
Does the Project:
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
c) Have environmental effects that will cause
substantial adverse effects on human beings,
either directly or indirectly?
Less Than Significant Impact With Mitigation Incorporated.
Direct and indirect impacts to human beings would be less than significant with the implementation of mitigation measures listed in this Initial Study.
□ □ □
□ □ □
Attachment 2 Agenda Report Page 159
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 4-84 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 160
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-1 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
5.0 COMPLIANCE WITH FEDERAL REGULATIONS
City of Piedmont is seeking funding for the Proposed Project under the SWRCB’s Clean Water State Revolving Fund (CWSRF) Program, which is partially funded through the USEPA. Because of the federal nexus with the USEPA, projects seeking funding through the CWSRF Program are subject to federal laws and regulations (e.g., federal “cross-cutters”). Under the CWSRF Program, SWRCB uses a project’s CEQA document along with federal cross-cutting documentation in place of a NEPA document; this document is termed a “CEQA-Plus” document. This section addresses the Project’s compliance with federal laws and regulations to satisfy the CEQA-Plus requirements.
5.1 Federal Regulations Evaluation
5.1.1 Archaeological and Historic Preservation Act
The Archaeological and Historic Preservation Act (AHPA) is a salvage bill that provides for the preservation of historical and archaeological materials and data that might be lost or destroyed through federally funded or licensed activities or programs (54 U.S. Code [USC] sections 312501-312508). This includes flooding, the construction of access roads, relocation of railroads and highways, or any other federally funded activity that is associated with the construction of a dam or reservoir. The AHPA authorizes federal agencies to transfer up to 1 percent of the total amount authorized for the project to the Secretary of the Interior for archeological salvage. Under this law, historical and archaeological resources do not have to be eligible, or considered eligible, in the National Register of Historic Properties for an impact to occur.
Pursuant to the terms of the Programmatic Agreement on Historic Preservation for the CWSRF, the USEPA requires that the State Water Board carry out the requirements of federal regulation 36 CFR Section 800.4 through 800.6, and other applicable sections of 36 CFR Part 800. The USEPA retains the responsibility for compliance with AHPA requirements.
The records search conducted for the project determined that 160 previously recorded pre-contact and historic-era cultural resources are located within 1 mile of the Project site. Of these 160 resources, two are believed to be associated with Native American occupation of the vicinity, and 158 are historic-era sites.
These resources are associated with the Mountain View Cemetery District and are either individual buildings or structures; several are noted as being elements associated with a district in the area. There are no previously recorded resources within the Project site. No resources were observed during the field survey.
There always remains the potential for ground-disturbing activities to expose previously unrecorded cultural resources. Implementation of Mitigation Measures CUL-1 and CUL-2 would reduce impacts to cultural resources to less than significant.
5.1.2 Clean Air Act
General Conformity ensures that the actions taken by federal agencies do not interfere with a state’s plans to attain and maintain national standards for air quality.
Attachment 2 Agenda Report Page 161
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-2 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Established under the Clean Air Act (section 176(c)(4)), the General Conformity rule plays an important role in helping states improve air quality in those areas that do not meet the NAAQS. Under the General Conformity rule, federal agencies must work with state and local governments in a nonattainment or maintenance area to ensure that federal actions conform to the air quality plans established in the applicable state or tribal implementation plan. The overall purpose of the General Conformity rule is to ensure that:
Federal activities do not cause or contribute to new violations of NAAQS; Actions do not worsen existing violations of the NAAQS; and Attainment of the NAAQS is not delayed.
Predicted annual construction-generated emissions for the Proposed Project are summarized in Table 4.3-
1. Construction-generated emissions are short term and of temporary duration, lasting only as long as construction activities occur, and would not be considered a significant air quality impact since the volume of pollutants generated does not exceed the Conformity Determination thresholds.
5.1.3 Coastal Barriers Resources Act
The Coastal Barrier Resources Act (CBRA) of 1982 designated various undeveloped coastal barriers for inclusion in the Coastal Barrier Resources System (CBRS). The CBRA encourages the conservation of storm-prone and dynamic coastal barriers by withdrawing the availability of federal funding and financial assistance within the CBRS (U.S. Fish and Wildlife Service [USFWS] 2024c).
The Proposed Project is not within the CBRS, as it is in the State of California. The CBRS encompasses areas along the Atlantic, Gulf of Mexico, Great Lakes, U.S. Virgin Islands, and Puerto Rico coasts but not the Pacific Coast. Therefore, the Coastal Barriers Resources Act does not apply to the Project.
5.1.4 Coastal Zone Management Act
The Coastal Zone Management Act (CZMA) was passed by Congress to encourage coastal states to develop and implement a Coastal Zone Management Program. The intents of CZMPs are to: protect natural resources; manage development in high hazard areas; give development priority to coastaldependent uses; provide public access for recreation; prioritize water-dependent uses; and coordinate state and federal actions (National Oceanic and Atmospheric Administration 2024). The federal government certified the California Coastal Management Program in 1977, the enforceable policies of which are found in Chapter 3 of the California Coastal Act of 1976, as amended (California Coastal Commission 2024).
The Project would be located in the City of Piedmont within Alameda County, approximately 13 miles east of the Pacific Coast. None of the Project’s components would be located within the coastal zone, thus the CZMA does not apply to the Project.
Attachment 2 Agenda Report Page 162
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-3 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
5.1.5 Endangered Species Act, Section 7
This section is based on the analysis and recommendations presented in the Biological Resources Assessment (BRA) prepared for the Proposed Project (ECORP 2024b, Appendix B).
The federal Endangered Species Act (ESA, 16 USC 1531 et seq.) and subsequent amendments establish legal requirements for the conservation of endangered and threatened species and the ecosystems upon which they depend. The ESA is administered by the USFWS for terrestrial species, and by the National Marine Fisheries Service (NMFS) for marine species and anadromous fish. Under the ESA, species may be listed as either endangered or threatened. Section 7(a)(2) of the ESA requires that for actions authorized, funded, or carried out by a federal agency, that the agency shall consult with USFWS and/or NMFS to ensure that their actions are not likely to jeopardize the continued existence of any threatened or endangered species, or result in the destruction or adverse modification of critical habitat of the endangered or threatened species.
There are no potentially occurring special-status species in the Project Area and the Proposed Project is not anticipated to have any adverse effects on special-status species. Therefore, the Project would not have the potential to violate the ESA.
5.1.6 Environmental Justice
In 1994, President Clinton issued the Executive Order (EO) 12898, “Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations,” to focus federal attention on the environmental and human health effects of federal actions on minority and low-income populations with the goal of achieving environmental protection for all communities (USEPA 2024a). EO 12898 directs federal agencies to:
Identify and address the disproportionately high and adverse human health or environmental effects of their actions on minority and low-income populations, to the greatest extent practicable and permitted by law
Develop a strategy for implementing environmental justice Promote nondiscrimination in federal programs that affect human health and the environment, as well as provide minority and low-income communities access to public information and public participation.
The Council on Environmental Quality (CEQ) oversees federal compliance with EO 12898 (CEQ 1997).
According to the CEQ environmental justice guidelines, minority populations should be identified if:
A minority population percentage either exceeds 50 percent of the population of the affected area, or
If the minority population percentage of the affected area is meaningfully greater than the minority population percentage in the general population or other appropriate unit of geographic analysis (e.g., a governing body’s jurisdiction, neighborhood census tract, or other similar unit).
Attachment 2 Agenda Report Page 163
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-4 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 A project may involve an environmental justice concern if the project could create new disproportionate impacts on minority, low-income, or indigenous populations; exacerbate existing disproportionate impacts on minority, low-income, or indigenous populations; or present opportunities to address existing disproportionate impacts on minority, low-income, or indigenous populations that are addressable through the project (SWRCB 2017).
The City’s 6th Cycle Housing Element (2023-2031) provides race and ethnicity characteristics and income information for City of Piedmont based on the U.S. Census 2020 American Community Survey (City of Piedmont 2023). In 2020, the population of Piedmont was estimated to be 11,453. Piedmont has a higher share of residents identifying as White, Non-Hispanic than the county and region, and a smaller share of residents identifying as American Indian or Alaska Native, Asian/Asian Pacific Islander, Non-Hispanic, Black or African American, and Hispanic or Latinx than compared to the county and region. The breakdown by race and ethnicity is as follows:
American Indian or Alaska Native, Non-Hispanic-less than 1% Black or African American, Non-Hispanic- less than 1% Other Race or Multiple Races, Non-Hispanic-6%
Asian/Asian Pacific Islander, Non-Hispanic-18%
White, Non-Hispanic- 71%
Hispanic or Latinx – 4%
The California Department of Housing and Community Development (HCD) identifies income categories based on the area median income (AMI) of City of Piedmont. The AMI for City of Piedmont in 2021 was $125,600 for a hypothetical family of four. HCD’s categories include the following:
Extremely low-income: household earning up to 30 percent of the AMI Very low-income: households earning between 31 to 50 percent of the AMI Low-income: households earning between 51 to 80 percent of the AMI Moderate-income: households earning between 81 to 120 percent of the AMI Above moderate-income: households earning over 120 percent of the AMI The homeownership rate is about 88 percent in Piedmont compared to about 54 percent in Alameda County. However, not all racial and ethnic groups have a similar probability of owning a home. Table
5.1.6-1 shows the Housing Tenure by Race/Ethnicity in Piedmont below:
Attachment 2 Agenda Report Page 164
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-5 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Table 5.1.6-1 Housing Tenure by Race/Ethnicity in Piedmont Race/Ethnicity
Renters Owners Total Occupied
Units Number % Number %
White alone, not Latino 399 85.8% 2,780 82.4% 3,179
Black or African American
alone
24 5.2% 22 0.7% 46
American Indian and Alaska
Native alone
0 0.0% 0 0.0% 0
Asian alone 33 7.1% 539 16.0% 572
Native Hawaiian/Other
Pacific Islander alone
0 0.0% 0 0.0% 0
Some other race alone 9 1.9% 0 0.0% 9
Two or more races 0 0.0% 32 0.9% 32
Hispanic or Latino origin 9 1.9% 89 2.6% 98
Total: 474 100.0% 3,462 100.0% 3,936
Source: City of Piedmont 2023
The established requirements under SB 535 (2012) for minimum funding levels to disadvantaged communities (DACs) and made CalEPA responsible for identifying DACs based on “geographic, socioeconomic, public health, and environmental hazard criteria.” Additionally, AB 1550 (2016) directed CalEPA to identify DACs and establish minimum funding levels. In May 2022, CalEPA updated the DAC designation to formally designate the following four categories of disadvantaged geographic areas (California Office of Environmental Health Hazard Assessment [OEHHA] 2024):
Census tracts receiving the highest 25 percent of overall scores in CalEnviroScreen 4.0 (1,984 tracts);
Census tracts lacking overall scores in CalEnviroScreen 4.0 due to data gaps, but receiving the highest 5 percent of CalEnviroScreen 4.0 cumulative pollution burden scores (19 tracts); Census tracts identified in the 2017 DAC designation as disadvantaged, regardless of their scores in CalEnviroScreen 4.0 (307 tracts); and
Lands under the control of federally recognized Tribes.
CalEPA’s SB 535 Disadvantage Communities Map tool shows the DACs census tracts and tribal areas as of 2022. The Project Area does not fall within the overlay area and therefore does not contain any DACs (OEHHA 2024).
The California Department of Water Resources (DWR) Disadvantaged Communities Mapping Tool is designed to assist in the evaluation of DACs throughout the state, as defined within the various grants programs that are the responsibility of DWR’s Financial Assistance Branch. Based on this mapping tool, is not within any census tracts, places, or block groups of Disadvantage Communities (DWR 2024).
Attachment 2 Agenda Report Page 165
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-6 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 On February 20, 2024, ECORP sent letters via certified mail and email to the potentially interested tribes that were identified by the NAHC. ECORP sent follow up emails on March 7, 2024. ECORP received a response from the Amah Mutsun Tribal Band of San Juan Bautista, recommending cultural sensitivity training and requested a Native American Monitor be present during earth moving activities. ECORP received a response from the Confederated Villages of Lisjan Nation, requesting copies of the records search results and the final report. ECORP received a response from the Ohlone Indian Tribe, requesting a copy of the record search results and the NAHC contact list. One letter to the Ohlone Indian Tribe was undeliverable by email.
Searches of the Sacred Lands File by the NAHC failed to indicate the presence of Tribal Cultural Resources in the Project Area. If no tribal cultural resources are identified during the consultation process, a potentially significant impact to known tribal cultural resources would not occur. However, subsurface construction disturbances (e.g., trenching, excavation, grading) associated with the Proposed Project would have the potential to impact unknown tribal cultural resources. To ensure proper protection of any unknown resources, should they be encountered during project-related ground disturbance activities, Mitigation Measures CUL-1 and CUL-2 discussed in Section 4.5.5 and Section 4.18.4 of this report would reduce potential impacts to cultural resources and TCRs to a less than significant level. Therefore, the Project would not have a disproportionate impact upon indigenous populations or tribes.
5.1.7 Farmland Protection Policy Act
The Farmland Protection Policy Act (FPPA) is intended to minimize the contribution of federal programs to the unnecessary and irreversible conversion of farmland to nonagricultural uses. It assures that to the extent possible federal programs are administered to be compatible with state, local units of government, and private programs and policies to protect farmland. It does not authorize the federal government to regulate the use of private or nonfederal land, or in any way affect the rights of property owners. Under the FPPA, farmland includes prime farmland, unique farmland, and land of statewide or local importance.
Farmland subject to FPPA requirements does not have to be currently used for cropland. It can be forest land, pastureland, cropland, or other land, but not water or urban built-up land (DOC 2023a).
The California Important Farmland Finder Map identifies the site as primarily Urban and Built-Up Land (DOC 2023b). The Project Area is not currently used for agriculture and no Prime or Unique Farmlands or Farmland of Statewide Importance is located within the Project Area. As such, the Project would not convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance.
5.1.8 Fish and Wildlife Coordination Act
This section is based on the analysis and recommendations presented in the BRA prepared for the Proposed Project (ECORP 2024b, Appendix B).
The Fish and Wildlife Coordination Act (16 USC 661-666(e)), approved in 1934 and amended in 2020, directs USFWS to investigate and report on proposed federal actions that affect any stream or other body of water and to provide recommendations to minimize impacts on fish and wildlife resources. The provisions of Section 662(a) and Section 663(a) do not apply to those projects for the impoundment of water where the maximum surface area of such impoundments is less than ten acres, nor to activities for Attachment 2 Agenda Report Page 166
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-7 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 or in connection with programs primarily for land management and use carried out by federal lands under their jurisdiction (SWRCB 2017).
There is no designated Critical Habitat within the Biological Study Area. Based on the literature review, the Biological Study Area may contain anadromous fish critical habitat for California Central Coast DPS steelhead and Southern DPS green sturgeon, and Essential Fish Habitat for coho and Chinook salmon.
However, the field reconnaissance site visit on February 15, 2024 confirmed that there is no suitable aquatic habitat in the BSA.
5.1.9 Floodplain Management
EO 13690, The Federal Flood Risk Management Standard (January 30, 2015) revises EO 11988, Floodplain Management (May 24, 1977), and directs federal agencies to take the appropriate actions to reduce risk to federal investments, specifically to update their flood-risk reduction standards. The goal of this directive is to improve the resilience of communities and federal assets against the impacts of flooding. These impacts are anticipated to increase over time due to the effects of climate change and other threats.
FEMA’s FIRMs are official community maps that shows special flood hazard areas and risk premium zones.
The City of Piedmont has not been included in the FEMA Flood Map Service Center (060011), and has not been designated as being within a flood hazard zone (FEMA 2024). Project implementation would not redirect or impede flood waters. Therefore, no impacts related to flood hazards or flood water flows would occur.
5.1.10 Magnuson-Stevens Fishery Conservation and Management Act The Magnuson-Stevens Fishery Conservation and Management Act (MSA) (Public Law 104-267) passed in 1976 and was amended by the Sustainable Fisheries Act of 1996 (Public Law 104-297) and the MagnusonStevens Fishery Conservation and Management Reauthorization Act in 2007. The MSA, as amended, governs marine fisheries management in U.S. federal waters out to 200 nautical miles from shore and encourages “long-term biological and economic sustainability of our nation's marine fisheries.” The goals of the MSA are to prevent overfishing, to rebuild overfished stocks, to increase long-term economic and social benefits, and to ensure a safe and sustainable supply of seafood. The act is in place to protect our natural resources, to maximize the possible use of these resources, and to make sure the use of marine resources is done in a safe manner. Amendments to the 1996 MSA require the identification of Essential Fish Habitat (EFH) for federally managed species and the implementation of measures to conserve and enhance this habitat. Any project requiring federal authorization is required to complete and submit an EFH Assessment with the application and either show that no significant impacts to the essential habitat of managed species are expected or identify mitigations to reduce those impacts. Under the MSA, Congress defined EFH as “those waters and substrate necessary to fish for spawning, breeding, feeding, or growth to maturity” (16 USC § 1802(10)). The EFH provisions of the MSA offer resource managers a means to heighten consideration of fish habitat in resource management. Pursuant to section 305(b)(2), federal agencies shall consult with the National Marine Fisheries Service regarding any action they authorize, fund, or undertake that might adversely affect EFH. The Proposed Project is within an urban area and would not affect any fisheries or EFH. Therefore, the MSA does not apply to the Project.
Attachment 2 Agenda Report Page 167
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-8 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
5.1.11 Migratory Bird Treaty Act of 1918
The MBTA of 1918 (16 USC 703-712) prohibits the take (including killing, capturing, selling, trading, and transport) of protected migratory bird species, including eggs or active nests, except as permitted by regulation (e.g., licensed hunting of waterfowl or upland game species) by the USFWS. The MBTA states that it applies only to migratory bird species that are native to the United States or U.S. territories, and that a native migratory bird species is one that is present as a result of natural biological or ecological processes.
The developed setting of the BSA provides nesting and foraging habitat for a few common resident and migratory birds that are protected under the MBTA, such as Anna’s hummingbird (Calypte anna), American crow (Corvus brachyrhynchos), American robin (Turdus migratorius), and house finch (Haemorhous mexicanus), among others.
There are no potentially occurring special-status species within the Project Area. Birds protected under the MBTA could potentially nest in close proximity to the Project. However, it is expected that birds nesting in this developed setting have become acclimated to human presence and disturbances. Therefore, implementation of the Proposed Project would not have an impact to migratory bird species. .
5.1.12 National Historic Preservation Act, Section 106
The National Historic Preservation Act (NHPA) of 1966, as amended sets forth the responsibilities that federal agencies must meet in regard to cultural resources, especially in regard to Section 106 as set forth in the regulations (36 CFR Part 800). The NHPA establishes a national preservation program and a system of procedural protections, which encourage both the identification and protection of historic resources, including archeological resources, at the federal level and indirectly at the state and local level. Federal agencies must conduct the necessary studies and consultations to identify cultural resources that may be affected by an undertaking, evaluate cultural resources that may be affected to determine if they are eligible for the NRHP (that is, whether identified resources constitute historic properties), and assess whether such historic properties would be adversely affected. Historic properties are resources listed on or eligible for listing on the NRHP (36 CFR 800.16[l][1]). A property may be listed in the NRHP if it meets criteria provided in the NRHP regulations (36 CFR 60.4). Typically, such properties must also be 50 years or older (36 CFR 60.4[d]). The quality of significance in American history, architecture, archaeology, engineering, and culture is present in districts, sites, buildings, structures, and objects that possess integrity of location, design, setting, materials, workmanship, feeling, or association and: (A) That are associated with events that have made a significant contribution to the broad patterns of our history; or (B) That are associated with the lives of persons significant in our past; or (C) That embody the distinctive characteristics of a type, period, or method of construction, or that represent the work of a master, or that possess artistic value, or that represent a significant and distinguishable entity whose components may lack individual distinction; or (D) That have yielded, or may be likely to yield, information important in prehistory or history. Section 106 defines an adverse effect as an effect that alters, directly or indirectly, the qualities that make a resource eligible for listing in the NRHP (36 CFR 800.5[a][1]). Consideration must be given to the property’s location, design, setting, materials, workmanship, feeling, and association, to the extent that these qualities contribute to the integrity and significance of the resource. Adverse effects Attachment 2 Agenda Report Page 168
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-9 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 may be direct and reasonably foreseeable or may be more remote in time or distance (36 CFR 8010.5[a][1]).
As discussed in Section 4.5 (Cultural Resources) of this IS/MND, the Historic Property Identification Report completed by ECORP (2023), analyzed the APE based on the provisions for the treatment of cultural resources contained within Section 106 of the NHPA. A record search was conducted in order to determine the potential for the Project to adversely affect cultural resources eligible for listing on the NRHP. As part of this process, the horizontal APE consists of all areas where activities associated with a project are proposed and, in the case of this Project, equals the Project Area subject to environmental review under the National Environmental Policy Act and CEQA. This includes areas proposed for excavation, pipe bursting, and other elements described in the Project Description.
The vertical APE is described as the maximum depth below the surface to which excavations for project foundations and facilities will extend. Therefore, the vertical APE for this Project includes all subsurface areas where archaeological deposits could be affected. The subsurface vertical APE varies across the Project Areas. The maximum depth is assumed to extend as deep as 15 feet below the current surface, which is typically the greatest depth for buried utilities; therefore, a review of geologic and soils maps was necessary to determine the potential for buried archaeological sites that cannot be seen on the surface.
The vertical APE also is described as the maximum height of structures that could impact the physical integrity and integrity of setting of cultural resources, including districts and traditional cultural properties.
For this Project, all above ground impacts will be temporary and consist of the equipment needed to complete the project.
The records search yielded 160 previously recorded cultural resources within the records search radius.
However, the records search and the 2024 field survey did not identify any historic-period or pre-contact cultural resources in the APE. Therefore, no Historic Properties under Section 106 of the NHPA or Historical Resources under CEQA will be affected by the Proposed Project.
5.1.13 Protection of Wetlands
The purpose of EO 11990 (May 24, 1977) is to minimize the destruction, loss or degradation of wetlands and to preserve and enhance the natural and beneficial values of wetlands, and to preserve and enhance the natural and beneficial values of wetlands in carrying out the agency’s responsibilities for (1) acquiring, managing, and disposing of Federal lands and facilities; and (2) providing Federally undertaken, financed, or assisted construction and improvements; and (3) conducting Federal activities and programs affecting land use, including but not limited to water and related land resources planning, regulating, and licensing activities. To meet these objectives, EO 11990 requires federal agencies, in planning their actions, to consider alternatives to wetland sites and limit potential damage if an activity affecting a wetland cannot be avoided (USEPA 2024b).
As described in Section 4.4 (Biological Resources) of this Initial Study, the field reconnaissance conduction on February 15, 2024 confirmed that there are no aquatic resources within the Project Area. Review of the NWI showed that there are no previously mapped aquatic features within the Project Area.
Attachment 2 Agenda Report Page 169
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-10 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
5.1.14 Rivers and Harbors Act, Section 10
The Rivers and Harbors Act of 1899 (RHA) (33 USC Section 401 et seq.) is the initial authority for the U.S.
Army Corps of Engineers (USACE) regulatory permit program to protect navigable waters in the development of harbors and other construction and excavation. Section 10 of the RHA requires authorization from the Secretary of the Army, acting through USACE, for the construction of any structure in or over any navigable water of the United States. Structures or work outside the limits defined for navigable waters of the United States require a Section 10 permit if the structure or work affects the course, location, or condition of the water body. The law applies to any dredging or disposal of dredged materials, excavation, filling, rechannelization, or any other modification of a navigable water of the United States, and applies to all structures. It includes, without limitation, any wharf, dolphin, weir, boom breakwater, jetty, groin, bank protection (e.g., riprap, revetment, bulkhead), mooring structures such as pilings, aerial or subaqueous power transmission lines, intake or outfall pipes, permanently moored floating vessel, tunnel, artificial canal, boat ramp, aids to navigation, and any other permanent, or semipermanent obstacle or obstruction.
The Project does not include the construction of any structure in or over any navigable water of the United States and would not require a Section 10 permit. The RHA does not apply to the Project.
5.1.15 Safe Drinking Water Act
The Safe Drinking Water Act of 1974 (SDWA) was established to protect the quality of drinking water in the U.S. This law focuses on all waters actually or potentially designated for drinking use, whether from above ground or underground sources. The SDWA authorizes USEPA to establish minimum standards to protect tap water and requires all owners or operators of public water systems to comply with these primary (health-related) standards. The USEPA also establishes minimum standards for state programs to protect underground sources of drinking water from endangerment by underground injection of fluids.
Under this SDWA, Congress emphasizes preventing contamination of aquifers that are the sole source of drinking water for a community under the SDWA (USEPA 2024c).
The Proposed Project is located in the City of Piedmont, within the Alameda County. Designated sole source aquifers in California are located in Fresno County, Scotts Valley, and on the California/Mexico border, none of which would be in the vicinity of the Proposed Project (USEPA 2024d). Therefore, the SDWA does not apply to the Project.
5.1.16 Wild and Scenic Rivers Act
The Wild and Scenic Rivers Act (16 USC Section 1271 et seq.) establishes the National Wild and Scenic Rivers System (NWSRS) for the protection of certain selected rivers with important scenic, recreational, geologic, fish and wildlife, historic, cultural, or other similar values. These rivers shall be preserved in freeflowing conditions and they and their immediate environments shall be protected. Rivers are classified as wild, scenic, or recreational. The Act designates specific rivers for inclusion in the NWSRS and prescribes the methods and standards by which additional rivers may be added. Regardless of classification, each river in the NWSRS is administered with the goal of protecting and enhancing the values that caused it to be designated. Designation neither prohibits development nor gives the federal government control over Attachment 2 Agenda Report Page 170
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-11 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 private property. Recreation, agricultural practices, residential development, and other uses may continue.
The Act purposefully strives to balance dam and other construction at appropriate sections of rivers with permanent protection for some of the country's most outstanding free-flowing rivers. To accomplish this, it prohibits federal support for actions such as the construction of dams or other instream activities that would harm the river's free-flowing condition, water quality, or outstanding resource values.
There are no wild and scenic rivers within the vicinity of the Proposed Project. The nearest designated wild and scenic river in the National Wild and Scenic Rivers System is American (Lower) River within Sacramento County, located approximately 92 miles northeast of the City of Piedmont (NWSRS 2024).
Therefore, no portion of the Project is located within or near a designated wild and scenic river.
Attachment 2 Agenda Report Page 171
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 5-12 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 172
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 6-1 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
6.0 ALTERNATIVES DESCRIPTIONS AND ANALYSIS
CWSRF projects must undergo an alternatives analysis except for projects that are statutorily or categorically exempt.
The alternatives analysis is included in the CWSRF Grant Funding Project Environmental Report submitted as part of the CWSRF technical package. Please refer to Appendix F.
Attachment 2 Agenda Report Page 173
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 6-2 October 2024
City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 174
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 7-1 October 2023
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
7.0 LIST OF PREPARERS
7.1 City of Piedmont
Lead Agency
Daniel Gonzales, Director of Public Works
7.2 ECORP Consulting, Inc.
CEQA Documentation/Air Quality/Biological Resources/Cultural Resources/Greenhouse Gas/Noise Chris Stabenfeldt, AICP, Program Director
Amberly Morgan, Project Manager
Brianna Gustafson, Associate Planner
Seth Myers, Air and Noise Specialists
Samantha Alfaro, Associate Environmental Planner
Molly Enloe, Senior Biologist
Keith Kwan, Senior Biologist
Erica Ramirez-Schroeder, Associate Archaeologist
Eveyln Hildebrand, Associate Archaeologist
Brian Marks, Archaeologists
Christa Westphal, Archaeologists
Lisa Westwood, Archaeologist
Niranjala Kottachchi, Paleontologists
Laura Hesse, Technical Editor
Kimberly Edwards, GIS and Mapping
7.3 Bennett Engineering
Engineering
Mike Massaro, P.E./Principal
Ali Holladay, EIT
Jessica Ginnever, EIT
Attachment 2 Agenda Report Page 175
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 7-2 October 2023
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2 Agenda Report Page 176
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 8-1 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080
8.0 BIBLIOGRAPHY
Alameda County Flood Control & Water Conservation District. 2023. Indian Gulch and Pleasant Valley Creeks Watershed. https://acfloodcontrol.org/the-work-we-do/resources/indian-gulch-andpleasant-valley-creeks-watershed/. Accessed November 2023.
Association of Bay Area Governments. 2021. MTC/ABAG Hazard Viewer Map. https://mtc.maps.arcgis.com/apps/webappviewer/index.html?id=4a6f3f1259df42eab29b35dfcd08 6fc8 (accessed November 2023).
Bay Area Air Quality Management District (BAAQMD). 2023. 2022 CEQA Guidelines – Chapter 3 Thresholds of Significance, https://www.baaqmd.gov/~/media/files/planning-and-research/ceqa/ceqaguidelines-2022/ceqa-guidelines-chapter-3-thresholds_final_v2- pdf.pdf?rev=a976830cce0c4a6bb624b020f72d25b3&sc_lang=en.
California Department of Forestry and Fire Protection (CAL FIRE). 2024. Fire Hazard Severity Zones in State Responsibility Area. https://osfm.fire.ca.gov/what-we-do/community-wildfire-preparedness-andmitigation/fire-hazard-severity-zones Accessed May 2024. _______. 2008. Very High Fire Hazard Severity Zone in LRA. https://34c031f8-c9fd-4018-8c5a4159cdff6b0d-cdn-endpoint.azureedge.net/-/media/new-folder- (2)/piedmont.pdf?rev=a8d558380e904b248a9e14fb736c458b&hash=A3DCFE541658DC7969C6EC D5339145C6. Accessed November 15, 2023
California Air Resources Board (CARB). 2022. State and Federal Area Designation Maps, https://ww2.arb.ca.gov/resources/documents/maps-state-and-federal-area-designations. _______. 2021. EMFAC Emissions Inventory, https://arb.ca.gov/emfac/emissionsinventory/dd1be11edd6d6e471fe0df1142bbc652a1e92f96.
California Coastal Commission. 2024. Maps Coastal Zone Boundary. https://coastal.ca.gov/maps/czb/.
Accessed May 2024.
California Department of Water Resources (DWR). 2023. DAC Mapping Tool, https://gis.water.ca.gov/app/dacs/. Accessed August 14, 2023.
California Office of Environmental Health Hazard Assessment (OEHHA). 2024. SB 535 Disadvantaged Communities, https://oehha.ca.gov/calenviroscreen/sb535. Accessed May 2024.
City of Piedmont. 2024. City of Piedmont Climate Action Program, https://piedmont.ca.gov/services___departments/planning___building/general_plan___other_policy _documents/climate_action_plan. Accessed January 23, 2024. _______. 2023. 6th Cycle Housing Element. https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_13659739/File/Government/Departments/Planning %20Division/General%20Plan/LWC_Piedmont_HEU_Final_083123_compiled_compressed.pdf?v=s QnDXRfDQ&v=sQnDXRfDQ Accessed May 2024.
Attachment 2 Agenda Report Page 177
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 8-2 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 _____. 2019. Local Hazard Mitigation Plan.
https://piedmont.hosted.civiclive.com/common/pages/DisplayFile.aspx?itemId=15970372 Accessed November 15, 2023
_____. 2018. Piedmont Climate Action Plan 2.0, https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_13659739/File/Government/Departments/Planning %20Division/Climate%20Action%20Program/CAP_2.0.pdf?v=QFlSuoJ4X&v=QFlSuoJ4X. _____. 2009a. City of Piedmont General Plan, Design and Preservation Element. https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_13659739/File/Government/Projects/General%20Pla n%20and%20Housing%20Element/08-Design&Preservation.pdf?v=nO2N4V77O&v=nO2N4V77O Accessed November 15, 2023.
_____. 2009b. City of Piedmont General Plan Environmental Hazards Element. https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_13659739/File/Government/Departments/Planning %20Division/General%20Plan/GP%20EHE%20adopted%202020-2-
18.pdf?v=DoBZIH6KG&v=DoBZIH6KG Accessed November 2023
_____. 2009c. Parks, Recreation, and Open Space Element. https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_13659739/File/Government/Projects/General%20Pla n%20and%20Housing%20Element/07-Park-Rec-Openspace.pdf?v=e89Qy5F12&v=e89Qy5F12 .
Accessed November 2023.
_____. 2009d. Natural Resources and Sustainability Element. https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_13659739/File/Government/Projects/General%20Pla n%20and%20Housing%20Element/05-Conservation.pdf?v=XgO5oUbt2&v=XgO5oUbt2 Accessed November 2023.
_____. 2009e. Community Services and Facilities Element. https://cdnsm5- hosted.civiclive.com/UserFiles/Servers/Server_13659739/File/Government/Projects/General%20Pla n%20and%20Housing%20Element/09-CommunityServices.pdf?v=DWudO7j0t&v=DWudO7j0t Accessed November 2023.
California Department of Transportation (Caltrans). 2023. California State Scenic Highway System Map. https://caltrans.maps.arcgis.com/apps/webappviewer/index.html?id=465dfd3d807c46cc8e805711 6f1aacaa Accessed November 15, 2023
_____. 2020. Transportation and Construction Vibration Guidance Manual, https://dot.ca.gov/-/media/dotmedia/programs/environmental-analysis/documents/env/tcvgm-apr2020-a11y.pdf. _____. 2013. Technical Noise Supplement to the Traffic Noise Analysis Protocol. _____. 2002. California Airport Land Use Planning Handbook.
Climate Registry. 2016. General Reporting Protocol for the Voluntary Reporting Program Version 2.1, Attachment 2 Agenda Report Page 178
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 8-3 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Council on Environmental Quality (CEQ). 1997. Environmental Justice Guidance Under the National Environmental Policy Act, https://www.epa.gov/sites/default/files/2015- 02/documents/ej_guidance_nepa_ceq1297.pdf. Accessed April 7, 2024.
Department of Conservation (DOC). 2023a. California Important Farmland Finder. https://maps.conservation.ca.gov/DLRP/CIFF/. Accessed November 15, 2023. _____. 2023b. California Williamson Act Enrollment Finder. https://maps.conservation.ca.gov/dlrp/WilliamsonAct/App/index.html Accessed November 15, 2023.
Department of Toxic Substance Control (DTSC). 2023. EnviroStor. https://www.envirostor.dtsc.ca.gov/public/profile_report?global_id=60001157 Accessed November 2023.
California Department of Finance (DOF). 2023. E-5 Population and Housing Estimates for Cities, Counties and the State, January 1, 2021-2023. Piedmont, California. https://dof.ca.gov/Forecasting/Demographics/Estimates/estimates-e5-2010-2021/ East Bay Municipal Utility District (EBMUD). 2023. Wastewater Treatment. https://www.ebmud.com/wastewater/collection-treatment/wastewater-treatment. Accessed November 2023.
_____. 2020. Urban Water Management Plan 2020. https://www.ebmud.com/water/about-yourwater/water-supply/urban-water-management-plan . Accessed November 2023.
ECORP Consulting, Inc. 2024a. Piedmont Sanitary Sewer Rehab Project Detailed Report: Air Quality and Greenhouse Gas Emissions Assessment Memorandum. January. _____. 2024b. Biological Resources Assessment for the City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project. March.
_____. 2024c. Historic Property Identification Report for the City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project. April 2024.
_____. 2024c. Piedmont Sanitary Sewer Rehab Project Energy Consumption Memorandum. January 2024. _____. 2024d. Piedmont Sanitary Sewer Rehab Project Noise Memorandum. January 2024.
Federal Highway Administration. 2011. Effective Noise Control During Nighttime Construction, http://ops.fhwa.dot.gov/wz/workshops/accessible/schexnayder_paper.htm. _______. 2008. Roadway Construction Noise Model, Version 1.1.
Federal Transit Administration (FTA). 2018. Transit Noise and Vibration Impact Assessment Manual, https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/research-innovation/118131/transit-noiseand-vibration-impact-assessment-manual-fta-report-no-0123_0.pdf.
Attachment 2 Agenda Report Page 179
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 8-4 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 Federal Emergency Management Agency (FEMA). 2024. Flood Map Products, https://www.fema.gov/flood-maps/products-tools/products. Accessed May 2024.
Graymer, R.W. 2000. Geologic map and map database of the Oakland metropolitan area, Alameda, Contra Costa, and San Francisco Counties, California. United States Geological Survey, Miscellaneous Field Studies Map MF-2342, scale 1:50,000.
Harris Miller, Miller & Hanson Inc. 2006. Transit Noise and Vibration Impact Assessment, Final Report.
National Oceanic and Atmospheric Administration. 2024. Office for Coastal Management. https://coast.noaa.gov/czm/about/. Accessed May 2024.
National Wild and Scenic Rivers System. 2024. Find a River. https://www.rivers.gov/map. Accessed May 2024.
Resources Conservation Service (NRCS), U.S. Geological Survey (USGS), and U.S. Environmental Protection Agency (USEPA). 2016. Watershed Boundary Dataset for California. https://datageteway.nrcs.usda.gov. Accessed February 2024.
Oakland Airport. 2006. Community Noise Equivalent Level (CNEL) Contours 2004 and 2010, https://www.oaklandairport.com/wp-content/uploads/2016/05/2010_CNEL_v_2004.pdf.
Pacific Gas & Electric (PG&E). 2024. Clean Energy Solutions, https://www.pge.com/en/about/corporateresponsibility-and-sustainability/taking-responsibility/clean-energysolutions.html#energysources.
Piedmont Unified School District (PUSD). 2023. Our Schools. https://www.piedmont.k12.ca.us/our-schools.
Accessed November 2023.
San Francisco Bay Regional Water Quality Control Board (SFBRWQCB). 2023. Water Quality Control Plan (Basin Plan) for the San Francisco Bay Basin.
https://www.waterboards.ca.gov/sanfranciscobay/basin_planning.html. Accessed November 2023.
State Water Resources Control Board (SWRCB). 2017. Appendix I: State Environmental Review Process, https://www.waterboards.ca.gov/water_issues/programs/grants_loans/srf/docs/policy0513/appen dix_i_envguide.pdf. Accessed May 2024.
Stinson, Manson, and Plappert. 1987. Mineral Classification: Aggregate Materials in the San Francisco/Monterey Bay Area.
https://maps.conservation.ca.gov/cgs/informationwarehouse/index.html?map=mlc.
U.S. Census Bureau. 2022. QuickFacts Piedmont City, California. https://www.census.gov/quickfacts/fact/table/piedmontcitycalifornia/PST045222. Accessed November 16, 2023.
U.S. Environmental Protection Agency (USEPA). 2024a. Summary of Executive Order 12898. https://www.epa.gov/laws-regulations/summary-executive-order-12898-federal-actions-addressenvironmental-justice. Accessed May 2024.
Attachment 2 Agenda Report Page 180
Draft Initial Study and Mitigated Negative Declaration
ECORP Consulting, Inc. 8-5 October 2024
City of Piedmont – Sanitary Sewer Rehabilitation Phase 6 Project 2023-080 _____. 2024b. Protection of Wetlands (Executive Order 11990). https://www.epa.gov/cwa-404/protectionwetlands-executive-order-11990. Accessed May 2024. _____. 2024c. Summary of the Safe Drinking Water Act, https://www.epa.gov/laws-regulations/summarysafe-drinking-water-act. Accessed May 2024. _____. 2024d. Sole Source Aquifers,
https://epa.maps.arcgis.com/apps/webappviewer/index.html?id=9ebb047ba3ec41ada1877155fe3 1356b. Accessed May 2024.
_____. 2023. De Minimis Tables, https://www.epa.gov/general-conformity/de-minimis-tables. _____. 2019. Water Technology Fact Sheet: Pipe Bursting. https://www.epa.gov/sites/default/files/2019- 08/documents/pipe_bursting_fact_sheet_p100il70.pdf . Accessed December 1, 2023. _____. 1994. General Conformity Guidance: Questions and Answers U.S. Fish & Wildlife Service. 2024. Coastal Barrier Resources Act. https://www.fws.gov/program/coastalbarrier-resources-act. Accessed May 2024.
U.S. Geological Survey (USGS). 1997 Oakland East, California 7.5-minute Quadrangle. United States Department of the Interior, Geological Survey, Denver.
Western Electro-Acoustic Laboratory, Inc. 2021. Sound Transmission Sound Test Laboratory Report No.
TL 21-227.
Attachment 2 Agenda Report Page 181
LIST OF APPENDICES
Appendix A –Air Quality and Greenhouse Gas Emissions Assessment Memorandum, ECORP 2024 Appendix B – Biological Resources Assessment. ECORP, 2024 Appendix C – Historic Property Identification Report for the City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project. ECORP, 2024
Appendix D – Energy Consumption Analysis Memorandum, ECORP 2024 Appendix E –Noise Impact Memorandum, ECORP, 2024
Appendix F –City of Piedmont Sanitary Sewer Rehabilitation Phase 6 Project Report, Bennett Engineering, 2024
Attachment 2 Agenda Report Page 182
APPENDIX A
Air Quality and Greenhouse Gas Emissions Assessment Memorandum, ECORP 2024
Attachment 2 Agenda Report Page 183
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 2 / 25
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
Attachment 2 Agenda Report Page 184
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 3 / 25
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
Attachment 2 Agenda Report Page 185
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 4 / 25
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
Attachment 2 Agenda Report Page 186
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 5 / 25
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Piedmont Sanitary Sewer Rehab Project
Construction Start Date 7/1/2024
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 3.90
Precipitation (days) 41.0
Location 37.822884936876804, -122.23119954743467
County Alameda
City Piedmont
Air District Bay Area AQMD
Air Basin San Francisco Bay Area
TAZ 1504
EDFZ 1
Electric Utility Pacific Gas & Electric Company
Gas Utility Pacific Gas & Electric
App Version 2022.1.1.21
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 3.34 Mile 10.1 0.00 0.00 — — Pipeline Replacement
Attachment 2 Agenda Report Page 187
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 6 / 25
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 4.87 4.09 28.9 35.6 0.06 1.32 0.50 1.82 1.22 0.12 1.33 — 6,241 6,241 0.24 0.07 2.33 6,271 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 4.85 4.08 28.9 35.3 0.06 1.32 0.50 1.82 1.22 0.12 1.33 — 6,203 6,203 0.24 0.07 0.06 6,230 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.70 0.59 4.09 5.02 0.01 0.18 0.08 0.25 0.16 0.02 0.18 — 925 925 0.04 0.01 0.16 930 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.13 0.11 0.75 0.92 < 0.005 0.03 0.01 0.05 0.03 < 0.005 0.03 — 153 153 0.01 < 0.005 0.03 154
2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
-------------------
-------------------
Attachment 2 Agenda Report Page 188
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 7 / 25
2024 4.87 4.09 28.9 35.6 0.06 1.32 0.50 1.82 1.22 0.12 1.33 — 6,241 6,241 0.24 0.07 2.33 6,271 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2024 4.85 4.08 28.9 35.3 0.06 1.32 0.50 1.82 1.22 0.12 1.33 — 6,203 6,203 0.24 0.07 0.06 6,230 Average
Daily
— — — — — — — — — — — — — — — — — —
2024 0.70 0.59 4.09 5.02 0.01 0.18 0.08 0.25 0.16 0.02 0.18 — 925 925 0.04 0.01 0.16 930 Annual — — — — — — — — — — — — — — — — — —
2024 0.13 0.11 0.75 0.92 < 0.005 0.03 0.01 0.05 0.03 < 0.005 0.03 — 153 153 0.01 < 0.005 0.03 154
3. Construction Emissions Details
3.1. Excavation (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
2.02 1.69 12.4 15.1 0.02 0.55 — 0.55 0.50 — 0.50 — 2,263 2,263 0.09 0.02 — 2,271 Dust
From
Material
Movement
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
-------------------
Attachment 2 Agenda Report Page 189
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 8 / 25
Off-Road 2.02 1.69 12.4 15.1 0.02 0.55 — 0.55 0.50 — 0.50 — 2,263 2,263 0.09 0.02 — 2,271 Equipment
Dust
From
Material
Movement
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.44 0.37 2.71 3.32 0.01 0.12 — 0.12 0.11 — 0.11 — 496 496 0.02 < 0.005 — 498 Dust
From
Material
Movement
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.08 0.07 0.49 0.61 < 0.005 0.02 — 0.02 0.02 — 0.02 — 82.1 82.1 < 0.005 < 0.005 — 82.4 Dust
From
Material
Movement
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.12 0.11 0.07 1.24 0.00 0.00 0.25 0.25 0.00 0.06 0.06 — 265 265 0.01 0.01 1.13 269 Vendor < 0.005 < 0.005 0.03 0.01 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 27.1 27.1 < 0.005 < 0.005 0.07 28.4 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Attachment 2 Agenda Report Page 190
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 9 / 25
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.11 0.10 0.09 1.10 0.00 0.00 0.25 0.25 0.00 0.06 0.06 — 246 246 0.01 0.01 0.03 249 Vendor < 0.005 < 0.005 0.04 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 27.1 27.1 < 0.005 < 0.005 < 0.005 28.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.02 0.02 0.02 0.23 0.00 0.00 0.05 0.05 0.00 0.01 0.01 — 54.2 54.2 < 0.005 < 0.005 0.11 55.0 Vendor < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 5.93 5.93 < 0.005 < 0.005 0.01 6.21 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.04 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 8.98 8.98 < 0.005 < 0.005 0.02 9.11 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 0.98 0.98 < 0.005 < 0.005 < 0.005 1.03 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.3. Hauling (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.70 0.58 4.05 3.52 0.01 0.15 — 0.15 0.13 — 0.13 — 1,453 1,453 0.06 0.01 — 1,458 Dust
From
Material
Movement
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 -------------------
Attachment 2 Agenda Report Page 191
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 10 / 25
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.70 0.58 4.05 3.52 0.01 0.15 — 0.15 0.13 — 0.13 — 1,453 1,453 0.06 0.01 — 1,458 Dust
From
Material
Movement
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.11 0.10 0.67 0.58 < 0.005 0.02 — 0.02 0.02 — 0.02 — 239 239 0.01 < 0.005 — 240 Dust
From
Material
Movement
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.02 0.02 0.12 0.11 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 39.5 39.5 < 0.005 < 0.005 — 39.7 Dust
From
Material
Movement
— — — — — — 0.00 0.00 — 0.00 0.00 — — — — — — —
Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.04 0.02 0.41 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 88.3 88.3 < 0.005 < 0.005 0.38 89.7 Attachment 2 Agenda Report Page 192
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 11 / 25
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.03 0.37 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 81.9 81.9 < 0.005 < 0.005 0.01 83.0 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.06 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 13.6 13.6 < 0.005 < 0.005 0.03 13.8 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.24 2.24 < 0.005 < 0.005 < 0.005 2.28 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.5. Paving (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.91 1.60 12.3 14.4 0.02 0.63 — 0.63 0.58 — 0.58 — 1,968 1,968 0.08 0.02 — 1,975 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 -------------------
Attachment 2 Agenda Report Page 193
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 12 / 25
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Off-Road
Equipment
1.91 1.60 12.3 14.4 0.02 0.63 — 0.63 0.58 — 0.58 — 1,968 1,968 0.08 0.02 — 1,975 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.10 0.09 0.67 0.79 < 0.005 0.03 — 0.03 0.03 — 0.03 — 108 108 < 0.005 < 0.005 — 108 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.02 0.02 0.12 0.14 < 0.005 0.01 — 0.01 0.01 — 0.01 — 17.9 17.9 < 0.005 < 0.005 — 17.9 Onsite
truck
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.08 0.07 0.05 0.83 0.00 0.00 0.17 0.17 0.00 0.04 0.04 — 177 177 < 0.005 0.01 0.75 179 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07 0.07 0.06 0.73 0.00 0.00 0.17 0.17 0.00 0.04 0.04 — 164 164 < 0.005 0.01 0.02 166 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Attachment 2 Agenda Report Page 194
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 13 / 25
Worker < 0.005 < 0.005 < 0.005 0.04 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.04 9.04 < 0.005 < 0.005 0.02 9.17 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.50 1.50 < 0.005 < 0.005 < 0.005 1.52 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Attachment 2 Agenda Report Page 195
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 14 / 25
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
-------------------
Attachment 2 Agenda Report Page 196
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 15 / 25
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Excavation Linear, Grading &
Excavation
7/1/2024 10/18/2024 5.00 80.0 —
Hauling Linear, Drainage, Utilities, &
Sub-Grade
8/1/2024 10/23/2024 5.00 60.0 —
Paving Linear, Paving 9/26/2024 10/23/2024 5.00 20.0 —
Attachment 2 Agenda Report Page 197
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 16 / 25
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Excavation Excavators Diesel Average 2.00 8.00 36.0 0.38 Excavation Rubber Tired Loaders Diesel Average 2.00 8.00 150 0.36 Excavation Sweepers/Scrubbers Diesel Average 1.00 8.00 36.0 0.46 Excavation Plate Compactors Diesel Average 1.00 8.00 8.00 0.43 Excavation Generator Sets Diesel Average 4.00 8.00 14.0 0.74 Excavation Air Compressors Diesel Average 2.00 8.00 37.0 0.48 Hauling Dumpers/Tenders Diesel Average 2.00 8.00 16.0 0.38 Hauling Off-Highway Trucks Diesel Average 2.00 4.00 376 0.38 Paving Rollers Diesel Average 2.00 8.00 36.0 0.38
Paving Pavers Diesel Average 1.00 8.00 81.0 0.42
Paving Air Compressors Diesel Average 1.00 8.00 84.0 0.37 Paving Other Construction
Equipment
Diesel Average 2.00 8.00 82.0 0.42
Paving Sweepers/Scrubbers Diesel Average 1.00 8.00 36.0 0.46 Paving Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Excavation — — — —
Excavation Worker 30.0 11.7 LDA,LDT1,LDT2
Excavation Vendor 1.00 8.40 HHDT,MHDT
Attachment 2 Agenda Report Page 198
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 17 / 25
Excavation Hauling 0.00 20.0 HHDT
Excavation Onsite truck — — HHDT
Hauling — — — —
Hauling Worker 10.0 11.7 LDA,LDT1,LDT2
Hauling Vendor 0.00 8.40 HHDT,MHDT
Hauling Hauling 0.00 20.0 HHDT
Hauling Onsite truck — — HHDT
Paving — — — —
Paving Worker 20.0 11.7 LDA,LDT1,LDT2
Paving Vendor 0.00 8.40 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Control Strategies Applied PM10 Reduction PM2.5 Reduction Water unpaved roads twice daily 55% 55%
Limit vehicle speeds on unpaved roads to 25 mph 44% 44%
5.5. Architectural Coatings
Phase Name Residential Interior Area Coated
(sq ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Attachment 2 Agenda Report Page 199
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 18 / 25
Phase Name Material Imported (Cubic Yards) Material Exported (Cubic Yards) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Excavation — — 10.1 0.00 —
Hauling — — 10.1 0.00 —
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
Water Demolished Area 2 36% 36%
5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Road Construction 10.1 100%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2024 0.00 204 0.03 < 0.005
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
Attachment 2 Agenda Report Page 200
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 19 / 25
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 8.03 annual days of extreme heat Extreme Precipitation 9.40 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 15.0 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events.
Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Attachment 2 Agenda Report Page 201
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 20 / 25
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation 3 0 0 N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation 3 1 1 3
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
Attachment 2 Agenda Report Page 202
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 21 / 25
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 3.12
AQ-PM 40.7
AQ-DPM 29.1
Drinking Water 4.21
Lead Risk Housing 61.2
Pesticides 0.00
Toxic Releases 52.3
Traffic 4.65
Effect Indicators —
CleanUp Sites 11.8
Groundwater 61.5
Haz Waste Facilities/Generators 76.0
Impaired Water Bodies 12.5
Solid Waste 52.9
Sensitive Population —
Asthma 21.5
Cardio-vascular 5.96
Low Birth Weights 0.60
Socioeconomic Factor Indicators —
Attachment 2 Agenda Report Page 203
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 22 / 25
Education 0.00
Housing 4.74
Linguistic 1.81
Poverty 0.04
Unemployment 10.7
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 96.57384833
Employed 60.23354292
Median HI 99.84601566
Education —
Bachelor's or higher 99.83318363
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 70.20402926
Active commuting 69.35711536
Social —
2-parent households 97.60041062
Voting 93.35300911
Neighborhood —
Alcohol availability 75.18285641
Park access 81.35506224
Retail density 55.01090722
Attachment 2 Agenda Report Page 204
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 23 / 25
Supermarket access 16.70730142
Tree canopy 97.8570512
Housing —
Homeownership 98.42166046
Housing habitability 94.39240344
Low-inc homeowner severe housing cost burden 93.54548954 Low-inc renter severe housing cost burden 54.20248941
Uncrowded housing 88.2586937
Health Outcomes —
Insured adults 99.92300783
Arthritis 0.0
Asthma ER Admissions 78.8
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 95.8
Cognitively Disabled 95.5
Physically Disabled 74.5
Heart Attack ER Admissions 96.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 19.6
Physical Health Not Good 0.0
Attachment 2 Agenda Report Page 205
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 24 / 25
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 13.5
SLR Inundation Area 0.0
Children 78.7
Elderly 21.4
English Speaking 78.3
Foreign-born 26.3
Outdoor Workers 74.0
Climate Change Adaptive Capacity —
Impervious Surface Cover 86.3
Traffic Density 9.6
Traffic Access 63.4
Other Indices —
Hardship 0.7
Other Decision Support —
2016 Voting 93.8
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 0.00 Healthy Places Index Score for Project Location (b) 100 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Attachment 2 Agenda Report Page 206
Piedmont Sanitary Sewer Rehab Project Detailed Report, 1/31/2024 25 / 25
Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
Screen Justification
Construction: Construction Phases Phases adjusted per information provided by project proponent.
Construction: Off-Road Equipment Equipment based on list provided by project proponent Attachment 2 Agenda Report Page 207
APPENDIX B
Biological Resources Assessment
Attachment 2 Agenda Report Page 208
Biological Resources Assessment
for the
City of Piedmont Sanitary Sewer Rehabilitation
Phase 6 Project
City of Piedmont, Alameda County, California
Prepared For:
Bennett Engineering Services
Prepared By:
2525 Warren Drive
Rocklin, California 95677
ECORP Consulting, Inc.
ENVIRONMENTAL CONSULTANTS
Attachment 2 Agenda Report Page 209
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
i DRAFT
2023-080
CONTENTS
1.0 INTRODUCTION .............................................................................................................................................................. 1-1
1.1 Project Location and Description............................................................................................................. 1-1
1.2 Biological Study Area.................................................................................................................................... 1-3
1.3 Purpose of this Biological Resources Assessment ............................................................................ 1-3
2.0 REGULATORY SETTING ................................................................................................................................................. 2-1
2.1 Federal Regulations ....................................................................................................................................... 2-1
2.1.1 Federal Endangered Species Act ............................................................................................. 2-1
2.1.2 Migratory Bird Treaty Act ........................................................................................................... 2-1
2.1.3 Federal Clean Water Act ............................................................................................................. 2-1
2.2 State or Local Regulations .......................................................................................................................... 2-2
2.2.1 California Fish and Game Code ............................................................................................... 2-2
2.2.2 Porter-Cologne Water Quality Act ......................................................................................... 2-4
2.2.3 California Environmental Quality Act..................................................................................... 2-4
2.2.4 City of Piedmont General Plan ................................................................................................. 2-7
2.2.5 City of Piedmont Heritage Tree Program ............................................................................ 2-8
3.0 METHODS .......................................................................................................................................................................... 3-1
3.1 Literature Review ............................................................................................................................................ 3-1
3.2 Site Reconnaissance ...................................................................................................................................... 3-1
4.0 RESULTS .............................................................................................................................................................................. 4-2
4.1 Site Characteristics and Land Use ............................................................................................................ 4-2
4.2 Soils and Geology .......................................................................................................................................... 4-2
4.3 Vegetation Communities and Land Cover Types .............................................................................. 4-4
4.4 Aquatic Resources ......................................................................................................................................... 4-4
4.5 Wildlife ............................................................................................................................................................... 4-4
4.6 Special-Status Species .................................................................................................................................. 4-4
4.7 Critical Habitat or Essential Fish Habitat ............................................................................................. 4-27
4.8 Wildlife Movement Corridors and Nursery Sites ............................................................................. 4-27
4.9 City of Piedmont Heritage Trees ............................................................................................................ 4-27
5.0 IMPACT ASSESSMENT AND RECOMMENDATIONS ......................................................................................... 5-1
5.1 California Environmental Quality Act Checklist Criteria IV(a) – Special-Status Species ..... 5-1
5.2 California Environmental Quality Act Checklist Criteria IV(b) – Sensitive Natural Communities .................................................................................................................................................... 5-1
5.3 California Environmental Quality Act Checklist Criteria IV(c) – Aquatic Resources ............. 5-1
5.4 CEQA Checklist Criteria IV(d) – Movement Corridors and Nursery Sites ................................. 5-2 Attachment 2 Agenda Report Page 210
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
ii DRAFT
2023-080
5.5 California Environmental Quality Act Checklist Criteria IV(e) – Conflicts with Local Policies or Ordinances .................................................................................................................................................. 5-2
5.6 California Environmental Quality Act Checklist Criteria IV(f) – Conflicts with Conservation Plans .................................................................................................................................................................... 5-2
6.0 REFERENCES ...................................................................................................................................................................... 6-1
LIST OF FIGURES
Figure 1. Project Location and Vicinity ................................................................................................................................... 1-2 Figure 2. Soils .................................................................................................................................................................................... 4-3 Figure 3. NWI Mapping ................................................................................................................................................................. 4-5
LIST OF TABLES
Table 1. Soil Series Mapped in the BSA .................................................................................................................................. 4-2 Table 2. Potentially Occurring Special–Status Species ..................................................................................................... 4-6
LIST OF APPENDICES
Appendix A – Results of Database Queries
LIST OF ACRONYMS AND ABBREVIATIONS
Term Definition
°F Degrees Fahrenheit
amsl Above mean sea level
ARD Aquatic Resources Delineation
BCC Birds of Conservation Concern
BRA Biological Resources Assessment
BSA Biological Study Area
CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
CFR Code of Federal Regulations
City City of Piedmont
CNDDB California Natural Diversity Database
CNPS California Native Plant Society
CRPR California Rare Plant Ranks
CWA Clean Water Act
DPS Distinct Population Segment
ESA Endangered Species Act
HCP Habitat Conservation Plan
LSAA Lake or Streambed Alteration Agreement
Attachment 2 Agenda Report Page 211
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
iii DRAFT
2023-080
Term Definition
MBTA Migratory Bird Treaty Act
MCV Manual of California Vegetation Online
NCCP Natural Community Conservation Plan
NMFS National Marine Fisheries Service
NOAA National Oceanic and Atmospheric Administration
NPDES National Pollutant Discharge Elimination System
NPPA Native Plant Protection Act
NRCS Natural Resources Conservation Service
NWI National Wetlands Inventory
OHWM Ordinary High Water Mark
RWQCB Regional Water Quality Control Board
SSC Species of Special Concern
USACE U.S. Army Corps of Engineers
USC U.S. Code
USFWS U.S. Fish and Wildlife Service
Attachment 2 Agenda Report Page 212
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
1-1 DRAFT
2023-080
1.0 INTRODUCTION
ECORP Consulting, Inc. conducted a Biological Resources Assessment (BRA) at the request of Bennett Engineering Services, for the proposed City of Piedmont Sanitary Sewer Rehabilitation Project, Phase 6 (Project) located in the City of Piedmont, Alameda County, California. The results of this assessment will support environmental review of the Project in accordance with the California Environmental Quality Act (CEQA) and provide the basis for identifying appropriate measures to lessen or avoid significant impacts to biological resources.
1.1 Project Location and Description
The Project includes segments in various locations within the City of Piedmont, Alameda County (Figure 1).
The Project consists of replacing approximately 17,626 linear feet of sanitary sewer collection pipe utilizing the pipe-bursting method. The Project will include the following elements:
15,166 linear feet of 6-inch pipe,
949 linear feet of 8-inch pipe,
458 linear feet of 10-inch pipe,
1,267 linear feet of 12-inch pipe,
241 linear feet of 15-inch pipe,
39 Main cleanout/Lamphole replacements,
280 Lateral reconnection/Two-way cleanout installations; and Four manholes
It is assumed that the existing manholes will be reused and reconnected to the new pipe. All sewer main cleanouts and lampholes are assumed to be replaced, and two-way cleanouts will be installed at the upstream limit of the rehabilitated lower sewer lateral behind the curb or sidewalk. There are 280 assumed lateral reconnections/two-way cleanout installations by estimating adjacent properties of each pipe segment. By the end of the Proposed Project, the City of Piedmont (City) will have rehabilitated/replaced 73 percent of its sewer mains.
The Project will be designed based on the City and County of Alameda Design Standards and Standard Specifications. Fusible high-density polyethylene pipe will be installed via pipe bursting in most cases.
Pipe bursting will be used when there is sufficient room and access for the equipment, within public rightof-way, and within accessible private property via the City’s “Right of Entry” on front yard and back yard private parcels. In rare cases where pipe-bursting equipment cannot be used, Cured-in-Place Pipe will be considered. Open trench will be only utilized when installing two-way cleanouts and reconnecting laterals to the new sanitary sewer pipelines.
Attachment 2 Agenda Report Page 213
Map Date: 2/8/2024
Sources: ESRI, USGS
Location: N:\2023\2023-080 City of Piedmont Sanitary Sewer\MAPS\Location_Vicinity\PSS LnV.aprx - Piedmont Sanitary Sewer LnV 20240208 (kedwards - 2/8/2024) Oakland East (1997, NAD 27)
CA 7.5-minute Topographic Quadrangle
US Geological Survey.
Alameda County, California
Unsectioned San Antonio
(V. and D. Peralta) Land Grant
Latitude (NAD83): 37.828462°
Longitude (NAD83): -122.231645°
Watershed: San Francisco Bay (18050004)
I
0 1,000 2,000
Scale in Feet
2023-080 City of Piedmont Sanitary Sewer Rehab
Figure 1. Project Location and Vicinity
Biological Study Area - 4.22 ac.
Staging Area - 11.78 ac.
___ .,,,. .......
, ~-
Berkeley • i
' r-r-7 ~ d ''v'
San Francisco • ..-:o...---. • ~ '·
)
ECORP Consulting, Inc. ...._. __ .,. f.N\"IROl\\l~\TAL CO Sl'LTA\T Attachment 2 Agenda Report Page 214
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
1-3 DRAFT
2023-080
Temporary staging would occur at the City’s corporation yard located at 898 Red Rock Road, Piedmont, California 94611. This site is paved, graveled, and currently highly disturbed.
1.2 Biological Study Area
The Biological Study Area (BSA) includes all areas where Project-related activities may result in impacts to sensitive biological resources. The BSA includes the approximately 4.22-acre Project Area and 11.78-acre Staging Area. The BSA corresponds to the Unsectioned San Antonia (V. and D. Peralta) Land Grant (Mount Diablo Base and Meridian) of the “Oakland East, California” 7.5-minute quadrangle (U.S. Geological Survey 1997; Figure 1). The approximate center of the BSA is located at latitude 37.828462° and longitude -122.231645° (North American Datum 1983) within the San Francisco Bay watershed (Hydrological Unit Code 18050004; Natural Resources Conservation Service [NRCS] et al. 2016).
1.3 Purpose of this Biological Resources Assessment
The purpose of this BRA is to assess the potential for occurrence of special-status plant and animal species or their habitats, and other sensitive or protected resources such as migratory birds, sensitive natural communities, riparian habitat, oak woodlands, and potential Waters of the U.S. or State, including wetlands, within the BSA. This assessment does not include determinate field surveys conducted according to agency-promulgated protocols. The conclusions and recommendations presented in this report are based upon a review of available literature and the results of a site reconnaissance field survey.
For the purposes of this assessment, special-status species are defined as plants or animals that:
are listed, proposed for listing, or candidates for future listing as threatened or endangered under the federal Endangered Species Act (ESA);
are listed or candidates for future listing as threatened or endangered under the California ESA;
meet the definitions of endangered or rare under Section 15380 of the CEQA Guidelines; are identified as a Species of Special Concern (SSC) by the California Department of Fish and Wildlife (CDFW);
are birds identified as Birds of Conservation Concern (BCC) by the U.S. Fish and Wildlife Service (USFWS);
are plants considered by the California Native Plant Society (CNPS) to be "rare, threatened, or endangered in California" or “rare, threatened, or endangered in California but more common elsewhere” (California Rare Plant Ranks [CRPR] 1 and 2); are plants listed as rare under the California Native Plant Protection Act (California Fish and Game Code, Section 1900 et seq.); or
are fully protected in California in accordance with the California Fish and Game Code, Sections 3511 (birds), 4700 (mammals), 5050 (amphibians and reptiles), and 5515 (fishes).
Attachment 2 Agenda Report Page 215
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
2-1 DRAFT
2023-080
2.0 REGULATORY SETTING
2.1 Federal Regulations
2.1.1 Federal Endangered Species Act
The federal ESA protects plants and animals that are listed as endangered or threatened by the USFWS or the National Marine Fisheries Service (NMFS). Section 9 of the ESA prohibits the taking of listed wildlife, where take is defined as “harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, collect, or attempt to engage in such conduct” (50 Code of Federal Regulations [CFR] 17.3). For plants, the ESA prohibits removing or possessing any listed plant on federal land, maliciously damaging or destroying any listed plant in any area, or removing, cutting, digging up, damaging, or destroying any such species in knowing violation of state law (16 U.S. Code [USC] 1538). Under Section 7 of ESA, federal agencies are required to consult with the USFWS if their actions, including permit approvals or funding, could adversely affect a listed (or proposed) species (including plants) or its designated Critical Habitat. Through consultation and the issuance of a Biological Opinion, the USFWS may issue an incidental take statement allowing take of a listed species that is incidental to an otherwise authorized activity provided the activity will not jeopardize the continued existence of the species. Section 10 of the ESA provides for issuance of incidental take permits where no other federal actions are necessary provided a Habitat Conservation Plan (HCP) is developed.
2.1.2 Migratory Bird Treaty Act
The Migratory Bird Treaty Act (MBTA) implements international treaties between the United States and other nations devised to protect migratory birds, any of their parts, eggs, and nests from activities such as hunting, pursuing, capturing, killing, selling, and shipping, unless expressly authorized in the regulations or by permit. The protections of the MBTA extend to disturbances that result in abandonment of a nest with eggs or young. The USFWS may issue permits to qualified applicants as authorized by the MBTA for the following types of activities: falconry, raptor propagation, scientific collecting, special purposes (rehabilitation, education, migratory game bird propagation, and salvage), take of depredating birds, taxidermy, and waterfowl sale and disposal. The regulations governing migratory bird permits can be found in 50 CFR part 13 General Permit Procedures and 50 CFR part 21 Migratory Bird Permits.
2.1.3 Federal Clean Water Act
The purpose of the federal Clean Water Act (CWA) is to “restore and maintain the chemical, physical, and biological integrity of the nation’s waters.” Section 404 of the CWA prohibits the discharge of dredged or fill material into Waters of the U.S. without a permit from the U.S. Army Corps of Engineers (USACE). The definition of Waters of the U.S. includes rivers, streams, estuaries, the territorial seas, ponds, lakes, and wetlands. Wetlands are defined as those areas:
“…that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a Attachment 2 Agenda Report Page 216
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
2-2 DRAFT
2023-080
prevalence of vegetation typically adapted for life in saturated soil conditions” (33 CFR 328.3 7b).
The U.S. Environmental Protection Agency also has authority over wetlands and may override a USACE permit.
Substantial impacts to wetlands may require an individual permit. Projects that only minimally affect wetlands may meet the conditions of one of the existing Nationwide Permits. A Water Quality Certification or waiver pursuant to Section 401 of the CWA is required for Section 404 permit actions; this certification or waiver is issued by the Regional Water Quality Control Board (RWQCB).
2.2 State or Local Regulations
2.2.1 California Fish and Game Code
2.2.1.1 California Endangered Species Act
The California ESA (California Fish and Game Code Sections 2050-2116) generally parallels the main provisions of the federal ESA, but unlike its federal counterpart, the California ESA applies the take prohibitions to species proposed for listing (called candidates by the state). Section 2080 of the California Fish and Game Code prohibits the taking, possession, purchase, sale, and import or export of endangered, threatened, or candidate species, unless otherwise authorized by permit or in the regulations. Take is defined in Section 86 of the California Fish and Game Code as “hunt, pursue, catch, capture, or kill, or attempt to hunt, pursue, catch, capture, or kill.” Section 2081 allows CDFW to authorize incidental take permits if species-specific minimization and avoidance measures are incorporated to fully mitigate the impacts of the project.
2.2.1.2 Fully Protected Species
The State of California first began to designate species as fully protected prior to the creation of the federal and California ESAs. Lists of fully protected species were initially developed to provide protection to those animals that were rare or faced possible extinction and included fish, amphibians and reptiles, birds, and mammals. Most fully protected species have since been listed as threatened or endangered under the state and/or federal ESAs. Previously, the regulations that implement the Fully Protected Species Statute (California Fish and Game Code Sections 4700 for mammals, 3511 for birds, 5050 for reptiles and amphibians, and 5515 for fish) provided that fully protected species may not be taken or possessed at any time. However, on July 10, 2023, Senate Bill 147 was signed into law, authorizing CDFW to issue take permits under the California ESA for fully protected species for qualifying projects through 2033. Qualifying projects include:
a maintenance, repair, or improvement project to the State Water Project, including existing infrastructure, undertaken by the Department of Water Resources; a maintenance, repair, or improvement project to critical regional or local water agency infrastructure;
Attachment 2 Agenda Report Page 217
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
2-3 DRAFT
2023-080
a transportation project, including any associated habitat connectivity and wildlife crossing project, undertaken by a state, regional, or local agency, that does not increase highway or street capacity for automobile or truck travel;
a wind project and any appurtenant infrastructure improvement, and any associated electric transmission project carrying electric power from a facility that is located in the state to a point of junction with any California based balancing authority; or a solar photovoltaic project and any appurtenant infrastructure improvement, and any associated electric transmission project carrying electric power from a facility that is located in the state to a point of junction with any California-based balancing authority.
CDFW may also issue licenses or permits for take of these species for necessary scientific research or live capture and relocation, and may allow incidental take for lawful activities carried out under an approved Natural Community Conservation Plan (NCCP) within which such species are covered.
2.2.1.3 Native Plant Protection Act
The Native Plant Protection Act (NPPA) of 1977 was created with the intent to “preserve, protect and enhance rare and endangered plants in this State.” The NPPA is administered by CDFW and provided in California Fish and Game Code Sections 1900-1913. The Fish and Wildlife Commission has the authority to designate native plants as endangered or rare and to protect endangered and rare plants from take. The California ESA of 1984 (California Fish and Game Code Sections 2050-2116) provided further protection for rare and endangered plant species, but the NPPA remains part of the California Fish and Game Code.
2.2.1.4 California Fish and Game Code Special Protections for Birds Sections 3503, 3513, and 3800 of the California Fish and Game Code specifically protect birds.
Section 3503 prohibits the take, possession, or needless destruction of the nest or eggs of any bird.
Subsection 3503.5 prohibits the take, possession, or destruction of any birds in the orders Strigiformes (owls) or Falconiformes (hawks and eagles), as well as their nests and eggs. Section 3513 prohibits the take or possession of any migratory nongame bird as designated in the MBTA. Section 3800 states that, with limited exceptions, it is unlawful to take any nongame bird, defined as all birds occurring naturally in California that are not resident game birds, migratory game birds, or fully protected birds. These provisions, along with the federal MBTA, serve to protect all nongame birds and their nests and eggs, except as otherwise provided in the code.
2.2.1.5 Lake or Streambed Alteration Agreements
Section 1602 of the California Fish and Game Code requires that a Notification of Lake or Streambed Alteration be submitted to CDFW for “any activity that may substantially divert or obstruct the natural flow or substantially change the bed, channel, or bank of any river, stream, or lake.” The notification must incorporate proposed measures to protect affected fish and wildlife resources. CDFW may suggest additional protective measures during their review. A Lake or Streambed Alteration Agreement (LSAA) is the final proposal mutually agreed upon by CDFW and the applicant. Projects that require an LSAA often Attachment 2 Agenda Report Page 218
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
2-4 DRAFT
2023-080
also require a permit from the USACE under Section 404 of the CWA. The conditions of the Section 404 permit and the LSAA frequently overlap in these instances.
2.2.2 Porter-Cologne Water Quality Act
The RWQCB implements water quality regulations under the federal CWA and the Porter-Cologne Water Quality Act. These regulations require compliance with the National Pollutant Discharge Elimination System (NPDES), including compliance with the California Storm Water NPDES General Construction Permit for discharges of storm water runoff associated with construction activities. General Construction Permits for projects that disturb 1 or more acres of land require development and implementation of a Storm Water Pollution Prevention Plan. Under the Porter-Cologne Water Quality Act, the RWQCB also regulates actions that would involve “discharging waste, or proposing to discharge waste, within any region that could affect the water of the state” (Water Code 13260(a)). Waters of the State are defined as “any surface water or groundwater, including saline waters, within the boundaries of the state” (Water Code 13050 (e)). The RWQCB regulates all such activities, as well as dredging, filling, or discharging materials into Waters of the State, that are not regulated by the USACE due to a lack of connectivity with a navigable water body. The RWQCB may require issuance of Waste Discharge Requirements for these activities.
2.2.3 California Environmental Quality Act
Per CEQA Guidelines Section 15380, a species not protected on a federal or state list may be considered rare or endangered if the species meets certain specified criteria. These criteria follow the definitions in the federal and California ESAs, and Sections 1900-1913 of the California Fish and Game Code, which deal with rare or endangered plants or animals. Section 15380 was included in the CEQA Guidelines primarily to deal with situations where a project under review may have a significant effect on a species that has not yet been listed by either the USFWS or CDFW.
2.2.3.1 CEQA Significance Criteria
Sections 15063-15065 of the CEQA Guidelines address how an impact is identified as significant.
Generally, impacts to listed (i.e., rare, threatened, or endangered) species are considered significant.
Assessment of impact significance to populations of non-listed species (e.g., SSC) usually considers the proportion of the species’ range that will be affected by a project, impacts to habitat, and the regional and population level effects.
Section 15064.7 of the CEQA Guidelines encourages local agencies to develop and publish the thresholds that the agency uses in determining the significance of environmental effects caused by projects under its review. However, agencies may also rely upon the guidance provided by the expanded Initial Study checklist contained in Appendix G of the CEQA Guidelines. Pursuant to Appendix G, impacts to biological resources would normally be considered significant if the project would:
have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by CDFW or USFWS;
Attachment 2 Agenda Report Page 219
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
2-5 DRAFT
2023-080
have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by CDFW or USFWS; have a substantial adverse effect on federally protected Waters of the U.S. including wetlands as defined by Section 404 of the CWA (including, but not limited to, marsh, vernal pool, and coastal) through direct removal, filling, hydrological interruption, or other means; interfere substantially with the movement of any native resident or migratory fish or wildlife species, or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites;
conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance; or
conflict with the provisions of an adopted HCP, NCCP, or other approved local, regional or state HCP.
An evaluation of whether an impact on biological resources would be substantial must consider both the resource itself and how that resource fits into a regional or local context. Substantial impacts would be those that would diminish, or result in the loss of, an important biological resource, or those that would obviously conflict with local, state, or federal resource conservation plans, goals, or regulations. Impacts are sometimes locally important but not significant according to CEQA because although the impacts would result in an adverse alteration of existing conditions, they would not substantially diminish or result in the permanent loss of an important resource on a population-wide or region-wide basis.
2.2.3.2 Species of Special Concern
SSC are defined by the CDFW as a species, subspecies, or distinct population of an animal native to California that are not legally protected under the ESA, the California ESA or the California Fish and Game Code, but currently satisfy one or more of the following criteria:
The species has been completely extirpated from the state or, as in the case of birds, it has been extirpated from its primary seasonal or breeding role. The species is listed as federally (but not state) threatened or endangered, and meets the state definition of threatened or endangered but has not formally been listed. The species has or is experiencing serious (noncyclical) population declines or range retractions (not reversed) that, if continued or resumed, could qualify it for state threatened or endangered status.
The species has naturally small populations that exhibit high susceptibility to risk from any factor that if realized, could lead to declines that would qualify it for state threatened or endangered status.
SSC are typically associated with threatened habitats. Projects that result in substantial impacts to SSC may be considered significant under CEQA.
Attachment 2 Agenda Report Page 220
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
2-6 DRAFT
2023-080
2.2.3.3 USFWS Bird of Conservation Concern
The 1988 amendment to the Fish and Wildlife Conservation Act mandates the USFWS “identify species, subspecies, and populations of all migratory nongame birds that, without additional conservation actions, are likely to become candidates for listing under ESA.” To meet this requirement, the USFWS published a list of BCC (USFWS 2021) for the U.S. The list identifies the migratory and nonmigratory bird species (beyond those already designated as federally threatened or endangered) that represent USFWS’ highest conservation priorities. Depending on the policy of the lead agency, projects that result in substantial impacts to BCC may be considered significant under CEQA.
2.2.3.4 California Rare Plant Ranks
The CNPS maintains the Rare Plant Inventory (CNPS 2024b), which provides a list of plant species native to California that are threatened with extinction, have limited distributions, or low populations. Plant species meeting one of these criteria are assigned to one of six CRPRs. The rank system was developed in collaboration with government, academic, non-governmental organizations, and private sector botanists, and is jointly managed by CDFW and the CNPS. The CRPRs are currently recognized in the California Natural Diversity Database (CNDDB). The following are definitions of the CNPS CRPRs:
Rare Plant Rank 1A – presumed extirpated in California and either rare or extinct elsewhere Rare Plant Rank 1B – rare, threatened, or endangered in California and elsewhere Rare Plant Rank 2A – presumed extirpated in California, but more common elsewhere Rare Plant Rank 2B – rare, threatened, or endangered in California but more common elsewhere
Rare Plant Rank 3 – a review list of plants about which more information is needed Rare Plant Rank 4 – a watch list of plants of limited distribution Additionally, the CNPS has defined Threat Ranks that are added to the CRPR as an extension. Threat Ranks designate the level of threat on a scale of 0.1 through 0.3, with 0.1 being the most threatened and 0.3 being the least threatened. Threat Ranks are generally present for all plants ranked 1B, 2B, or 4, and for the majority of plants ranked 3. Plant species ranked 1A and 2A (presumed extirpated in California), and some species ranked 3, which lack threat information, do not typically have a Threat Rank extension. The following are definitions of the CNPS Threat Ranks:
Threat Rank 0.1 – Seriously threatened in California (greater than 80 percent of occurrences threatened/high degree and immediacy of threat)
Threat Rank 0.2 – Moderately threatened in California (20 to 80 percent occurrences threatened/moderate degree and immediacy of threat)
Threat Rank 0.3 – Not very threatened in California (less than 20 percent of occurrences threatened/low degree and immediacy of threat or no current threats known) Attachment 2 Agenda Report Page 221
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
2-7 DRAFT
2023-080
Factors, such as habitat vulnerability and specificity, distribution, and condition of occurrences, are considered in setting the Threat Rank; and differences in Threat Ranks do not constitute additional or different protection (CNPS 2024b). Depending on the policy of the lead agency, substantial impacts to plants ranked 1A, 1B, 2A, or 2B are typically considered significant under CEQA Guidelines Section 15380.
Significance under CEQA is typically evaluated on a case-by-case basis for plants ranked 3 or 4.
2.2.3.5 Sensitive Natural Communities
Sensitive natural communities are vegetation communities that are imperiled or vulnerable to environmental effects of projects. CDFW maintains the California Natural Community List (CDFW 2023), which provides a list of vegetation alliances, associations, and special stands as defined in A Manual of California Vegetation Online (MCV; CNPS 2024a), along with their respective state and global rarity ranks, if applicable. Natural communities with a state rarity rank of S1, S2, or S3 are considered sensitive natural communities. Depending on the policy of the lead agency, impacts to sensitive natural communities may be considered significant under CEQA.
2.2.3.6 Wildlife Movement Corridors and Nursery Sites
Impacts to wildlife movement corridors or nursery sites may be considered significant under CEQA. As part of the California Essential Habitat Connectivity Project, the CDFW and California Department of Transportation maintain data on Essential Habitat Connectivity areas. This data is available in the CNDDB.
The goal of this project is to map large intact habitat or natural landscapes and potential linkages that could provide corridors for wildlife. In urban settings, riparian vegetated stream corridors can also serve as wildlife movement corridors. Nursery sites include but are not limited to concentrations of nest or den sites such as heron rookeries, bat maternity roosts, and mule deer critical fawning areas. These data are available through CDFW’s Biogeographic Information and Observation System database or as occurrence records in the CNDDB and are supplemented with the results of the field reconnaissance.
2.2.4 City of Piedmont General Plan
The General Plan contains the City’s official policies on land use, transportation, housing, natural resources, sustainability, environmental hazards, public services, parks, and community design (City of Piedmont 2009, amended 2020). The Natural Resources and Sustainability Element of the General Plan addresses the protection and management of Piedmont’s earth, water, air, and biological resources. The following General Plan goals, policies and actions are pertinent to this biological assessment report:
Goal 13: Natural Features – Protect and enhance Piedmont’s natural features, including its hillsides, creeks, and woodlands.
Policy 13.3 – Creek Protection
Policy 13.4 – Conserving Native Vegetation
Policy 13.5 – Protection of Special Status Species
Action 13.A – Biological Assessment Requirements
Attachment 2 Agenda Report Page 222
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
2-8 DRAFT
2023-080
2.2.5 City of Piedmont Heritage Tree Program
The Piedmont Heritage Tree Program was created by the City Council, acting upon a recommendation from the Park Commission, on January 16, 2018. The overall intent of the Heritage Tree Policy is to:
Recognize and identify special and distinctive trees that are noteworthy by their size, unique species, prominent location or historical context in our parks or open spaces. Encourage residents to visit City parks and open spaces to find trees eligible for heritage tree designation.
Promote the study of nature through the use, enjoyment, and greater awareness of our public parks, streets, and medians.
Since its inception, the Park Commission has designated 19 trees (or groups of trees) as City of Piedmont Heritage Trees.
Attachment 2 Agenda Report Page 223
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
3-1 DRAFT
2023-080
3.0 METHODS
3.1 Literature Review
ECORP biologists performed a review of existing available information for the BSA. Literature sources included current and historical aerial imagery, any previous biological studies conducted for the area, topographic mapping, soil survey mapping available from the NRCS Web Soil Survey, USFWS National Wetlands Inventory (NWI) mapping, USFWS Critical Habitat Mapper, NMFS Essential Fish Habitat Mapper, and other relevant literature as cited throughout this document. ECORP reviewed the following resources to identify special-status plant and wildlife species that have been documented in or near the BSA:
The CDFW CNDDB for the “Oakland East, California” 7.5-minute quadrangle and the surrounding eight quadrangles (CDFW 2024);
The CNPS Rare Plant Inventory data for the "Oakland East, California" 7.5-minute quadrangle and the surrounding eight quadrangles (CNPS 2024b);
The USFWS Information for Planning and Consultation Resource Report List for the BSA (USFWS 2024);
The NMFS Resources data for the “Oakland East, California” 7.5-minute quadrangle (NOAA 2022).
The results of the database queries are provided in Appendix A. Each special-status species identified in the literature review is evaluated for its potential to occur in the BSA in Section 4 based on available information concerning species habitat requirements and distribution, occurrence data, and the findings of the site reconnaissance.
3.2 Site Reconnaissance
ECORP Senior Biologist Keith Kwan conducted the site reconnaissance visit on February 15, 2024. The biologist visually assessed the BSA while walking meandering transects through all portions of the site, using binoculars to scan inaccessible areas. The biologist collected the following biological resource information:
Characteristics and approximate boundaries of vegetation communities and other land cover types; and
Plant and animal species or their sign directly observed.
The biologist qualitatively assessed and mapped vegetation communities, if present, based on dominant plant composition. There were no vegetation communities in the BSA, as the entire BSA is developed.
Data were recorded on a Global Positioning System unit, field notebooks, and/or maps.
Attachment 2 Agenda Report Page 224
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-2 DRAFT
2023-080
4.0 RESULTS
4.1 Site Characteristics and Land Use
The BSA is located in an urban setting, including within existing paved streets, sidewalks, residential yards, and the City’s corporation yard at Red Rock Road, which is a paved and developed facility. The City corporation yard portion of the BSA is situated at an elevation of approximately 400 feet above mean sea level (amsl) and the streets portion of the BSA range from approximately 100 feet to 400 feet amsl in the San Francisco Bay Area subregion, Central Western California region of the California floristic province (Jepson eFlora 2024). The average winter temperature is 51.7 degrees Fahrenheit (˚F) and the average summer temperature is 63.7˚F; the average annual precipitation is approximately 26.12 inches at the Berkeley, CA station, which is approximately 3 miles from the BSA (NOAA 2024a).
There are no native or natural vegetation communities located within the BSA. The BSA is located on heavily sloped terrain. The streets are narrow and paved with asphalt with developed sidewalks, curbs, and gutters. Landscaping trees and shrubs are scattered along the sidewalks and residential yards. Trees and shrubs are made up of native and nonnative cultivars.
Land uses surrounding the BSA include urban development.
4.2 Soils and Geology
ECORP staff obtained soil survey mapping for the BSA from the NRCS Web Soil Survey accessed on February 20, 2024 (Figure 2). Table 1 provides an overview of the soil series mapped within the BSA and key features of the soil series.
Table 1. Soil Series Mapped in the BSA
Map Unit
Symbol Map Unit Name Rating Hydric Soil Rating
126 Maymen loam, 30 to 75 percent
slopes
Residuum weathered from sedimentary rock No
127 Maymen-Los Gatos complex, 30 to
75 percent slopes
Residuum weathered from sedimentary rock No
151 Urban land-tierra complex, 5 to 15
percent slopes
Alluvium No
159 Xerorthents-Millsholm complex, 30
to 50 percent slopes
Residuum weathered from sandstone and
shale
No
Attachment 2 Agenda Report Page 225
151
149
I
Location: N:\2023\2023-080 City of Piedmont Sanitary Sewer\MAPS\Soils_and_Geology\PSS Soils and Geology.aprx - PSS Soils 20240208 (kedwards - 2/8/2024) 0 60 120
Scale in Feet
Map Date: 2/8/2024
Sources: Esri Imagery, Maxar (2022), Alameda County
Natural Resources Conservation Service (NRCS)
Soil Survey Geographic (SSURGO) Database for
Alameda County, CA
2023-080 City of Piedmont Sanitary Sewer Rehab
Figure 2. Soils
Map Features
Project Area - 4.22 ac.
Staging Area - 11.78 ac.
NRCS Soil Type
Series Number - Series Name
151 - Urban land-Tierra complex, 5 to 15 percent
slopes
Consulting Inc
ENTAL CO S L~A T;
c:?
'.)) .,,.,- ,.,. Piedm
ont
"'
- © '\I
0 ,~
- ~
Attachment 2 Agenda Report Page 226
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-4 DRAFT
2023-080
4.3 Vegetation Communities and Land Cover Types
The BSA is completely developed and consists of paved streets, sidewalks, curbs/gutters, and landscaped residential yards. There are no natural or native vegetation communities present.
4.4 Aquatic Resources
The field reconnaissance conducted on February 15, 2024 confirmed that there are no aquatic resources within the BSA. Review of the NWI showed that there are no previously mapped aquatic features within the BSA (Figure 3).
4.5 Wildlife
The developed setting of the BSA provides nesting and foraging habitat for a few common resident and migratory birds that are protected under the MBTA, such as Anna’s hummingbird (Calypte anna), American crow (Corvus brachyrhynchos), American robin (Turdus migratorius), and house finch (Haemorhous mexicanus), among others. Other wildlife species acclimated to the urban setting in the BSA include Virginia opossum (Didelphis virginiana), eastern fox squirrel (Sciurius niger), striped skunk (Mephitis mephitis), and common racoon (Procyon lotor).
4.6 Special-Status Species
Table 2 presents the list of special-status plant and animal species identified through the literature review.
For each species, the table provides the listing status, a brief description of habitat requirements and/or species ecology, a determination of the potential to occur within the BSA, and the rationale for that determination. The potential for each species to occur onsite was assessed using the following criteria:
Present – Species was observed during the site visit or is known to occur within the BSA based on recent documented occurrences within the CNDDB or other literature. Potential to Occur – Suitable habitat (including soils and elevation requirements) occurs in the BSA and the species is known or expected to occur in the Project vicinity based on available data sources or professional knowledge/experience. Low Potential to Occur – Marginal or limited amounts of habitat occur or the species is not known to occur in the vicinity of the Project based on CNDDB records and other available information.
Absent – No suitable habitat (including soils and elevation requirements) and the species is not known to occur within the vicinity of the Project based on CNDDB records and other documentation.
Attachment 2 Agenda Report Page 227
OAKLAND AV
HIGHLAND AV
HIGHLAND AV
MORAGA AV
MORAGA AV
GRAND AV
HAMPTON RD
HAMPTON RD
MORAGA AV
CROCKER AV
PIEDMONT AV
PLEASANT VALLEY AV
PLEASANT VALLEY AV
WILDWOOD AV
RAMONA AV
0 400 800
I
Scale in Feet
Location: N:\2023\2023-080 City of Piedmont Sanitary Sewer\MAPS\Aquatic_Resources\PSS Aquatic Resources.aprx - PSS NWI 20240209 (kedwards - 2/9/2024) Figure 3. NWI Mapping Map Date: 2/9/2024
Sources: Esri Imagery, Maxar (2022), Alameda County, USFWS 2023-080 City of Piedmont Sanitary Sewer Rehab
Map Contents
Project Area - 4.22 ac.
Staging Area - 11.78 ac.
NWI Features
Freshwater Pond
Riverine
Consulting I
ENTAL co s ' nc. LTA TS ---
11 11
CJ
I
' I ,, L<oomis
I
I ,,-
I
,_ / /
If
I
Rockdin
/ / '?,'
I /_,£\ I 'if,'?,
~ @
_ _,,ston ridg
\ nch
)
Attachment 2 Agenda Report Page 228
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-6 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Plants
Bent-flowered
fiddleneck
(Amsinckia lunaris)
– – 1B.2 Cismontane woodland,
coastal bluff scrub, and
valley and foothill
grasslands.
Elevation: 10’–1,640’
Bloom Period: March–June
Absent. There is no suitable
habitat in the BSA.
California androsace
(Androsace elongate
ssp. acuta)
– – 4.2 Chaparral, cismontane
woodland, coastal scrub,
meadow and seeps, pinyon
and juniper woodland, and
valley and foothill
grasslands. Elevation: 490’-
4,280’. Bloom period:
March-June.
Absent. There is no suitable
habitat in the BSA.
Pallid manzanita
(Arctostaphylos pallida)
FT CE 1B.1 Siliceous shale, sandy, or
gravelly areas of
broadleaved upland forest,
chaparral, closed–cone
coniferous forest,
cismontane woodland, and
coastal scrub.
Elevation: 605’–1,525’
Bloom Period: December–
March
Absent. There is no suitable
habitat in the BSA.
Alkali milk-vetch
(Astragalus tener var.
tener)
– – 1B.2 Alkaline playas and vernal
pools, and alkaline adobe
clay soils in valley and
foothill grasslands.
Elevation: 5’–195’
Bloom Period: March–June
Absent. There is no suitable
habitat in the BSA.
Big-scale balsamroot
(Balsamorhiza
macrolepis)
– – 1B.2 Chaparral, cismontane
woodland, and valley and
foothill grassland,
sometimes on serpentine
soils.
Elevation: 150’–5,100’
Bloom Period: March–June
Absent. There is no suitable
habitat in the BSA.
Big tarplant
(Blepharizonia plumosa
ssp. plumosa)
– – 1B.1 Valley and foothill grassland.
Elevation: 100’–1,655’
Bloom Period: July–October
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 229
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-7 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Mt. Diablo fairylantern
(Calochortus
pulchellus)
– – 1B.2 Chaparral, cismontane
woodland, riparian
woodland, and valley and
foothill grassland.
Elevation: 100’–2,755’
Bloom Period: April–June
Absent. There is no suitable
habitat in the BSA.
Coastal bluff morningglory
(Calystegia purpurata
ssp. saxicola)
– – 1B.2 Coastal bluff scrub, coastal
dunes, coastal scrub, and
North Coast coniferous
forest.
Elevation: 0’–345’
Bloom Period: April–
September
Absent. There is no suitable
habitat in the BSA.
Bristly sedge
(Carex comosa)
– – 2B.1 Mesic (Jepson eFlora) valley
and foothill grassland,
coastal prairie, and lake
margins of marshes and
swamps.
Elevation: 0’–2,050’
Bloom Period: May–
September
Absent. There is no suitable
habitat in the BSA.
Congdon’s tarplant
(Centromadia parryi
ssp. congdonii)
– – 1B.1 Valley and foothill grassland
with alkaline soils.
Elevation: 0’–755’
Bloom Period: May–October
Absent. There is no suitable
habitat in the BSA.
Point Reyes bird’sbeak
(Chloropyron
maritimum ssp.
palustre)
– – 1B.2 Coastal salt marshes and
swamps.
Elevation: 0’–35’
Bloom Period: June–October
Absent. There is no suitable
habitat in the BSA.
Soft salty bird’s-beak
(Chloropyron molle
ssp. molle)
FE CR 1B.2 Coastal salt marshes and
swamps.
Elevation: 0’–10’
Bloom Period: July–
November
Absent. There is no suitable
habitat in the BSA.
San Francisco Bay
spineflower
(Chorizanthe cuspidata
var. cuspidata)
– – 1B.2 In sandy substrate coastal
bluff scrub, coastal dunes,
coastal prairie, and coastal
scrub.
Elevation: 10’–705’
Bloom Period: April–July
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 230
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-8 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Robust spineflower
(Chorizanthe robusta
var. robusta)
FE – 1B.1 Sandy or gravelly soils
within maritime chaparral,
cismontane woodland,
coastal dunes, and coastal
scrub.
Elevation: 10’–985’
Bloom Period: April–
September
Absent. There is no suitable
habitat in the BSA.
Bolander’s waterhemlock
(Cicuta maculata var.
bolanderi)
– – 2B.1 Coastal, fresh, or brackish
marshes and swamps.
Elevation: 0’–655’
Bloom Period: July–
September
Absent. There is no suitable
habitat in the BSA.
Franciscan thistle
(Cirsium andrewsii)
– – 1B.2 Mesic, sometimes
serpentine soils in
broadleafed upland forest,
coastal bluff scrub, coastal
prairie, and coastal scrub.
Elevation: 0’–490’
Bloom Period: March–July
Absent. There is no suitable
habitat in the BSA.
Presidio clarkia
(Clarkia franciscana)
FE CE 1B.1 Coastal scrub and
serpentine soils on
valley/foothill grasslands.
Elevation: 80’–1,100’
Bloom Period: May–July
Absent. There is no suitable
habitat in the BSA.
Western leatherwood
(Dirca occidentalis)
– – 1B.2 Mesic areas in broadleaf
upland forest, closed–cone
coniferous forest, chaparral,
cismontane woodland,
North Coast coniferous
forest, riparian forest, and
riparian woodland.
Elevation: 80’–1,395’
Bloom Period: January–
March
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 231
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-9 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Tiburon buckwheat
(Eriogonum luteolum
var. caninum)
– – 1B.2 Serpentine, sandy to
gravelly areas of chaparral,
cismontane woodland,
coastal prairie, valley and
foothill grassland.
Elevation: 0’–2,295’
Bloom Period: May–
September
Absent. There is no suitable
habitat in the BSA.
Jepson’s coyote thistle
(Eryngium jepsonii)
– – 1B.2 Clay soils of valley and
foothill grassland, and
vernal pools.
Elevation: 10’–985’
Bloom Period: April–August
Absent. There is no suitable
habitat in the BSA.
San Joaquin spearscale
(Extriplex joaquinana)
– – 1B.2 Occurs in alkaline areas
within chenopod scrub,
meadows and seeps, playas,
and valley and foothill
grassland.
Elevation: 5’–2,740’
Bloom Period: April–October
Absent. There is no suitable
habitat in the BSA.
Minute pocket moss
(Fissidens pauperculus)
– – 1B.2 Damp soil, dry streambeds,
and stream banks in north
coast coniferous forest and
redwood communities.
Elevation: 35’–3,360’
Bloom Period: N/A
Absent. There is no suitable
habitat in the BSA.
Fragrant fritillary
(Fritillaria liliacea)
– – 1B.2 Cismontane woodland,
coastal prairie, coastal scrub,
and valley and foothill
grassland, often on
serpentine substrates.
Elevation: 10’–1,345’
Bloom Period: February–
April
Absent. There is no suitable
habitat in the BSA.
Blue coast gilia
(Gilia capitata ssp.
chamissonis)
– – 1B.1 Coastal dunes and coastal
scrub.
Elevation: 5’–655’
Bloom Period: April–July
Absent. There is no suitable
habitat in the BSA.
Dark-eyed gilia
(Gilia millefoliata)
– – 1B.2 Coastal dunes.
Elevation: 5’–100’
Bloom Period: April–July
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 232
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-10 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Diablo helianthella
(Helianthella castanea)
– – 1B.2 Usually rocky, axonal soils in
broadleaf upland forest,
chaparral, cismontane
woodland, coastal scrub,
riparian woodland, valley
and foothill grassland, often
in partial shade.
Elevation: 195’–4,265’
Bloom Period: March–June
Absent. There is no suitable
habitat in the BSA.
Congested-headed
hayfield tarplant
(Hemizonia congesta
ssp. congesta)
– – 1B.2 Valley and foothill grassland
and sometimes roadsides.
Elevation: 65’–1,835’
Bloom Period: April–
November
Absent. There is no suitable
habitat in the BSA.
Water star-grass
(Heteranthera dubia)
– – 2B.2 Alkaline (pH of 7 of higher),
still or slow–moving, and
usually slightly eutrophic
waters of marshes and
swamps.
Elevation: 100’–4,905’
Bloom Period: July–October
Absent. There is no suitable
habitat in the BSA.
Loma Prieta hoita
(Hoita strobilina)
– – 1B.1 Mesic areas in chaparral,
cismontane woodland, and
riparian woodland, usually
on serpentine substrates.
Elevation: 100’–2,820’
Bloom Period: May–July
Absent. There is no suitable
habitat in the BSA.
Santa Cruz tarplant
(Holocarpha
macradenia)
FT CE 1B.1 coastal prairie, coastal scrub,
and valley and foothill
grassland, often on clay or
sandy substrates.
Elevation: 35’–720’
Bloom Period: June–October
Absent. There is no suitable
habitat in the BSA.
Kellogg’s horkelia
(Horkelia cuneata var.
sericea)
– – 1B.1 Sandy or gravelly openings
within closed–cone
coniferous forest, maritime
chaparral, coastal dunes,
and coastal scrub.
Elevation: 35’–655’
Bloom Period: April–
September
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 233
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-11 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Carquinez goldenbush
(Isocoma arguta)
– – 1B.1 Alkaline soils in valley and
foothill grasslands.
Elevation: 5’–65’
Bloom Period: August–
December
Absent. There is no suitable
habitat in the BSA.
Contra Costa
goldfields
(Lasthenia conjugens)
FE – 1B.1 Mesic sites within
cismontane woodland,
playas with alkaline soils,
valley and foothill grassland
and vernal pools.
Elevation: 0’–1,540’
Bloom Period: March–June
Absent. There is no suitable
habitat in the BSA.
Beach layia
(Layia carnosa)
FT CE 1B.1 Coastal dunes and coastal
scrub.
Elevation: 0’–195’
Bloom Period: March–July
Absent. There is no suitable
habitat in the BSA.
Rose leptosiphon
(Leptosiphon rosaceus)
– – 1B.1 Coastal bluff scrub.
Elevation: 0’–330’
Bloom Period: April–July
Absent. There is no suitable
habitat in the BSA.
Hall’s bush-mallow
(Malacothamnus hallii)
– – 1B.2 Chaparral and coastal scrub.
Elevation: 30’–2,495’
Bloom Period: May–
September
Absent. There is no suitable
habitat in the BSA.
Oregon meconella
(Meconella oregana)
– – 1B.1 Coastal prairie and coastal
scrub.
Elevation: 820’–2,035’
Bloom Period: March–April
Absent. There is no suitable
habitat in the BSA.
Woodland
woollythreads
(Monolopia gracilens)
– – 1B.2 Serpentine substrates in
openings in broadleaf
upland forest and chaparral,
cismontane woodland,
openings in North Coast
coniferous forest, and valley
and foothill grassland.
Elevation: 330’–3,935’
Bloom Period: March–July
Absent. There is no suitable
habitat in the BSA.
Antioch Dunes
evening-primrose
(Oenothera deltoides
ssp. howellii)
FE CE 1B.1 Inland dunes.
Elevation: 0’–100’
Bloom Period: March–
September
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 234
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-12 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Choris’ popcornflower
(Plagiobothrys
chorisianus var.
chorisianus)
– – 1B.2 Mesic areas in chaparral,
coastal prairie, and coastal
scrub.
Elevation: 10’–525’
Bloom Period: March–June
Absent. There is no suitable
habitat in the BSA.
San Francisco
popcornflower
(Plagiobothrys diffusus)
– CE 1B.1 Coastal prairie and valley
and foothill grassland.
Elevation: 195’–1,180’
Bloom Period: March–June
Absent. There is no suitable
habitat in the BSA.
Hairless popcornflower
(Plagiobothrys glaber)
– – 1A Alkaline meadows and
seeps; coastal salt marshes
and swamps.
Elevation: 50’–590’
Bloom Period: March–May
Absent. There is no suitable
habitat in the BSA.
Marin knotweed
(Polygonum
marinense)
– – 3.1 Coastal salt or brackish
marshes and swamps.
Elevation: 0’–35’
Bloom Period: May–August
Absent. There is no suitable
habitat in the BSA.
Adobe sanicle
(Sanicula maritima)
– CR 1B.1 Clay or serpentine soils
within chaparral, coastal
prairie, meadows and seeps,
and valley and foothill
grassland.
Elevation: 100’–785’
Bloom Period: February–
May
Absent. There is no suitable
habitat in the BSA.
Long-styled sandspurrey
(Spergularia
macrotheca var.
longistyla)
– – 1B.2 Alkaline meadows, seeps,
marshes, and swamps.
Elevation: 0’–835’
Bloom Period: February–
May
Absent. There is no suitable
habitat in the BSA.
Most beautiful
jewelflower
(Streptanthus albidus
ssp. peramoenus)
– – 1B.2 Serpentine soils in chaparral,
cismontane woodland, and
valley and foothill grassland.
Elevation: 310’–3,280’
Bloom Period: April–
September
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 235
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-13 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Northern slender
pondweed
(Stuckenia filiformis
ssp. alpina)
– – 2B.2 Assorted shallow freshwater
marshes and swamps.
Elevation: 985’–7,055’
Bloom Period: May–July
Absent. There is no suitable
habitat in the BSA.
California seablite
(Suaeda californica)
FE – 1B.1 Coastal salt marshes and
swamps.
Elevation: 0’–50’
Bloom Period: July–October
Absent. There is no suitable
habitat in the BSA.
Suisun Marsh aster
(Symphyotrichum
lentum)
– – 1B.2 Brackish and freshwater
marshes and swamps.
Elevation: 0’–10’
Bloom Period: May–
November
Absent. There is no suitable
habitat in the BSA.
Saline clover
(Trifolium
hydrophilum)
– – 1B.2 Marshes and swamps, mesic
and alkaline areas in valley
and foothill grassland, and
vernal pools.
Elevation: 0’–985’
Bloom Period: April–June
Absent. There is no suitable
habitat in the BSA.
San Francisco owl’sclover
(Triphysaria floribunda)
– – 1B.2 Usually serpentine soils in
coastal prairie, coastal scrub,
and valley and foothill
grassland.
Elevation: 35’–525’
Bloom Period: April–June
Absent. There is no suitable
habitat in the BSA.
Oval-leaved viburnum
(Viburnum ellipticum)
– – 2B.3 Chaparral, cismontane
woodland, and lower
montane coniferous forest
communities.
Elevation: 705’–4,595’
Bloom Period: May–June
Absent. There is no suitable
habitat in the BSA.
Invertebrates
Crotch’s bumble bee
(Bombus crotchii)
– CC – Primarily nests underground
in open grassland and scrub
habitats from the California
coast east to the Sierra
Cascade and south to
Mexico.
Survey Period: MarchSeptember
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 236
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-14 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Western bumble bee
(Bombus occidentalis)
– CC – Meadows and grasslands
with abundant floral
resources. Primarily nests
underground. Largely
restricted to high elevation
sites in the Sierra Nevada,
although rarely detected on
the California coast.
Survey Period: AprilNovember
Absent. There is no suitable
habitat in the BSA.
Vernal pool fairy
shrimp
(Branchinecta lynchi)
FT – – Vernal pools/wetlands.
Survey Period: November–
April when surface water is
present.
Absent. There is no suitable
habitat in the BSA.
Monarch butterfly –
California
overwintering
population
(Danaus plexippus)
FC – – Overwinters along coastal
California in wind-protected
groves of eucalyptus,
Monterey pine and cypress
with nearby nectar and
water sources; disperses in
spring throughout
California. Adults breed and
lay eggs during the spring
and summer, feeding on a
variety of nectar sources;
eggs are laid exclusively on
milkweed plants.
Absent. There is no suitable
overwintering habitat in the
BSA.
Bay checkerspot
butterfly
(Euphydryas editha
bayensis)
FT – – All suitable habitats are on
shallow, serpentine-derived
or similar soils that support
the two host plants the
larvae are dependent on;
dwarf plantain (Plantago
erecta) and purple owl’s
clover (Castilleja exserta spp.
exserta).
Absent. There is no suitable
habitat in the BSA.
Fish
Green sturgeon
(Acipenser medirostris)
FT – SSC Anadromous; undammed
cold-water rivers having
relatively deep pools with
large substrates.
Survey Period: N/A
Absent. There is no suitable
aquatic habitat in the BSA.
Attachment 2 Agenda Report Page 237
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-15 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Sacramento perch
(Archoplites
interruptus)
– – SSC Ponds, rivers, backwaters,
reservoirs, and lakes in the
Central Valley.
Survey Period: N/A
Absent. There is no suitable
aquatic habitat in the BSA.
Tidewater goby
(Eucyclogobius
newberryi)
FE – – Relatively still, shallow,
brackish waters of Coastal
lagoons, estuaries, and
marshes from Tillas Slough
in Del Norte County to Agua
Hedionda Lagoon in
northern San Diego County.
Survey Period: N/A
Absent. There is no suitable
aquatic habitat in the BSA.
Steelhead (CA Central
California Coast
Distinct Population
Segment [DPS])
(Oncorhynchus mykiss
irideus)
FT – – Fast-flowing, welloxygenated rivers and
streams. This DPS includes
naturally spawned
anadromous steelhead
originating below natural
and manmade impassable
barriers from the Russian
River to and including Aptos
Creek, and all drainages of
San Francisco and San Pablo
Bays eastward to Chipps
Island at the confluence of
the Sacramento and San
Joaquin Rivers.
Survey Period: N/A
Absent. There is no suitable
aquatic habitat in the BSA.
Longfin smelt
(Spirinchus
thaleichthys)
FC CT SSC Freshwater and coastal
estuaries.
Survey Period: N/A
Absent. There is no suitable
aquatic habitat in the BSA.
Amphibians
Attachment 2 Agenda Report Page 238
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-16 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
California red-legged
frog
(Rana draytonii)
FT – SSC Lowlands and foothills of
the northern and southern
Coast Ranges and Sierra
Nevada. Found in deep
standing or flowing water
with dense shrubby or
emergent riparian
vegetation; requires 11-20
weeks of permanent water
for larval development.
Adults require aestivation
habitat to endure summer
dry down.
Survey Period: January –
Sept.
Absent. There is no suitable
aquatic habitat in and no
suitable upland habitat
adjacent to the BSA.
Foothill yellow-legged
frog
West/Central Coast
Clade
(Rana boylii)
FT CE SSC Partly shaded shallow
streams and riffles in variety
of habitats. Needs cobblesized substrate for egglaying and at least 15 weeks of permanent water to
attain metamorphosis. Can
be active all year in warmer
locations; become inactive
or hibernate in colder
climates. San Francisco
Peninsula and Diablo Range
to southern inner Coast
Ranges.
Survey Period: May–
October.
Absent. There is no suitable
aquatic habitat in and no
suitable upland habitat
adjacent to the BSA.
California tiger
salamander (Central
California DPS)
(Ambystoma
californiense)
FT CT CDFW
WL
Breeds in vernal pools and
seasonal wetlands in
grassland or oak woodland
habitats; adults are
terrestrial using
underground refuges such
as ground squirrel or
gopher burrows. Central
Valley and Inner Coast
Range.
Survey Period: WinterSpring.
Absent. There is no suitable
aquatic habitat in and no
suitable upland habitat
adjacent to the BSA.
Reptiles
Attachment 2 Agenda Report Page 239
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-17 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Northern California
legless lizard
(Anniella pulchra)
– – SSC The most widespread of
California’s Anniella species.
Occurs in sandy or loose
soils under sparse
vegetation from Antioch
south coastally to Ventura.
Bush lupine is often an
indicator plant, and two
melanistic populations are
known.
Survey Period: Generally
spring, but depends on
location and conditions
Absent. There is no suitable
habitat within or around the
BSA.
Northwestern pond
turtle
(Actinemys marmorata)
FPT – SSC Requires basking sites and
upland habitats up to 0.5
km from water for egg
laying. Uses ponds, streams,
detention basins, and
irrigation ditches.
Survey Period: AprilSeptember
Absent. There is no suitable
habitat within or around the
BSA.
Green sea turtle
(Chelonia mydas)
FT – – Found in fairly shallow
waters (except when
migrating) inside reefs, bays,
and inlets. The turtles are
attracted to lagoons and
shoals with an abundance of
marine grass and algae.
Open beaches with a
sloping platform and
minimal disturbance are
required for nesting.
Survey Period: N/A
Absent. There is no suitable
habitat within or around the
BSA.
Attachment 2 Agenda Report Page 240
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-18 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Alameda whipsnake
(Coluber lateralis
euryxanthus)
FT CT – Occurs in coastal scrub and
chaparral communities, but
also forages in a variety of
other communities in the
inner Coast Range, including
grasslands and open
woodlands. Rock outcrops
with deep crevices or
abundant rodent burrows
are important habitat
components.
Survey Period: March –
October
Absent. There is no suitable
habitat within or around the
BSA.
Birds
Aleutian cackling
goose
(Branta hutchinsii
leucopareia)
Delisted– CDFW
WL
Overwintering habitat
includes mudflats, shallow
tidal waters, salt marsh, wet
grasslands, freshwater
marsh, lakes, reservoirs and
rivers (breeds in Alaska on
various Aleutian Islands;
winters in California’s
Central Valley, with a small
wintering population in
southwestern Oregon, and
migration staging areas
around Humboldt Bay and
Crescent City in California
and New River bottoms in
Oregon.
Wintering: October-March
Absent. There is no suitable
wintering habitat in or
adjacent to the BSA.
Yellow rail
(Coturnicops
noveboracensis)
– – BCC,
SSC
Found in sedge meadows,
dense stands of bulrush,
high marshlands dominated
by sedges and grasses (in
California, found in Lassen,
Plumas, Siskiyou, Modoc
counties, and San Francisco
Bay and Tomales Bay
regions).
Nesting: May-September
Absent. There is no suitable
habitat in or adjacent to the
BSA.
Attachment 2 Agenda Report Page 241
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-19 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
California black rail
(Laterallus jamaicensis
coturniculus)
– CT CFP Salt marsh, shallow
freshwater marsh, wet
meadows, and flooded
grassy vegetation. In
California, primarily found in
coastal and Bay-Delta
communities, but also in
Sierran foothills (Butte,
Yuba, Nevada, Placer, El
Dorado counties).
Nesting: March-September
Absent. There is no suitable
habitat in or adjacent to the
BSA.
Ridgway's rail
(California Ridgway’s
rail)
(Rallus obsoletus
obsoletus)
FE CE CFP Occur within a range of tidal
and brackish waters along
the perimeter of San
Francisco and San Pablo Bay
in tidal marshes, sloughs,
with pickleweed (Salicornia
spp.), cordgrass (Spartina
spp.), and gum plant
(Grindelia spp.).
Nesting: February-August
Absent. There is no suitable
habitat in or adjacent to the
BSA.
Western snowy plover
(Coastal population)
(Charadrius nivosus
nivosus)
FT – SSC Nests on the ground, on
open sandy coastal beaches
and barrier islands.
Nesting: March-September
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
California least tern
(Sternula antillarum
browni)
FE CE CFP Nests along Pacific Coast
from San Francisco Bay
south the Mexico; nests
colonially, on sand or dried
mudflats, sand or shell
islands, and gravel and sand
pits and rarely in agricultural
fields, parking lots, airports,
and flat/graveled rooftops.
Nesting: April-August
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Attachment 2 Agenda Report Page 242
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-20 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Black skimmer
(Rynchops niger)
– – BCC,
SSC
Coastal beaches and islands
near oceans or Gulf of
Mexico; occasionally seen
inland, particularly sites such
as Salton Sea. Nests on
sparsely vegetated beaches,
dredge-spoiled islands, and
salt marshes.
Nesting: April-September
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Double-crested
cormorant
(Nannopterum
auritum)
– – CDFW
WL
Nests near ponds, lakes,
artificial impoundments,
slow-moving rivers, lagoons,
estuaries, and open
coastlines and typically
forages in shallow water.
Non-nesters are found in
many coastal and inland
waters.
Nesting: April-August
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
White-tailed kite
(Elanus leucurus)
– – CFP Nesting occurs within trees
in low elevation grassland,
agricultural, wetland, oak
woodland, riparian,
savannah, and urban
habitats.
Nesting: March-August
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Attachment 2 Agenda Report Page 243
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-21 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Golden eagle
(Aquila chrysaetos)
– – CFP,
CDFW
WL
Nesting habitat includes
mountainous canyon land,
rimrock terrain of open
desert and grasslands,
riparian, oak woodland/
savannah, and chaparral.
Nesting occurs on cliff
ledges, river banks, trees,
and human-made structures
(e.g. windmills, platforms,
and transmission towers).
Breeding occurs throughout
California, except the
immediate coast, Central
Valley floor, Salton Sea
region, and the Colorado
River region, where they can
be found during Winter.
Nesting: February-August
Absent. There is no suitable
breeding or foraging habitat
in or adjacent to the BSA.
Northern harrier
(Circus hudsonius)
– – BCC,
SSC
Nests on the ground in
open wetlands, marshy
meadows, wet/lightly
grazed pastures, (rarely)
freshwater/brackish
marshes, tundra, grasslands,
prairies, croplands, desert,
shrub-steppe, and (rarely)
riparian woodland
communities.
Nesting: April-September
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Sharp-shinned hawk
(Accipiter striatus)
– – CDFW
WL
Nests in trees in most forest
types with at least some
conifers. In California,
nesting occurs in Sierra
Nevada and Cascade
Ranges (foothills to tree
line) and northwestern
coastal range.
Nesting: April-August
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Attachment 2 Agenda Report Page 244
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-22 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Cooper’s hawk
(Accipiter cooperii)
– – CDFW
WL
Nests in trees in riparian
woodlands in deciduous,
mixed and evergreen
forests, as well as urban
landscapes (Rosenfield et al.
2020).
Nesting: March-July
Absent. There is no suitable
nesting or foraging habitat in
or adjacent to the BSA.
Bald eagle
(Haliaeetus
leucocephalus)
DelistedCE CFP Typically nests in forested
areas near large bodies of
water in the northern half of
California; nest in trees and
rarely on cliffs; wintering
habitat includes forest and
woodland communities near
water bodies (e.g., rivers,
lakes), wetlands, flooded
agricultural fields, open
grasslands.
Nesting: FebruarySeptember Wintering:
October-March
Absent. There is no suitable
breeding or foraging habitat
in or adjacent to the BSA.
Burrowing owl
(Athene cunicularia)
– – BCC,
SSC
Nests in burrows or burrow
surrogates in open, treeless,
areas within grassland,
steppe, and desert biomes.
Often with other burrowing
mammals (e.g., prairie dogs,
California ground squirrels).
May also use human-made
habitat such as agricultural
fields, golf courses,
cemeteries, roadside,
airports, vacant urban lots,
and fairgrounds.
Nesting: February-August
Absent. There is no suitable
breeding or foraging habitat
in or adjacent to the BSA.
Attachment 2 Agenda Report Page 245
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-23 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
American peregrine
falcon
(Falco peregrinus
anatum)
DelistedDelistedCFP In California, breeds in
coastal region, northern
California, and Sierra
Nevada. Nesting habitat
includes cliff ledges and
human-made ledges on
towers and buildings.
Wintering habitat includes
areas where there are large
concentrations of
shorebirds, waterfowl,
pigeons or doves.
CA Residents nest in
February-June
Absent. There is no suitable
breeding or foraging habitat
in the BSA.
Suisun song sparrow
(Melospiza melodia
maxillaris)
– – SSC Resident of brackish
marshes of Suisun Bay.
Year-round resident; nests
March-July
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Alameda song sparrow
(Melospiza melodia
pusillula)
– – BCC,
SSC
Resident of salt marshes
skirting south San Francisco
Bay.
Year-round resident; nests
February-August
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
San Pablo song
sparrow
(Melospiza melodia
samuelis)
– – BCC,
SSC
Resident of salt marshes of
San Francisco and San Pablo
bays.
Year-round resident; nests
March-July
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Yellow-headed
blackbird
(Xanthocephalus
xanthocephalus)
– – BCC,
SSC
In California, breeds in the
Great Basin region, along
Colorado River south to Baja
California, Salton Sea, Kern,
Ventura, Riverside, San
Diego and possibly Orange,
Lake counties and locally in
the Central Valley, Nests are
constructed over deep water
in emergent vegetation of
prairie wetlands, quaking
aspen parklands, mountain
meadows, forest edges,
large lakes.
Nesting: April-July
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Attachment 2 Agenda Report Page 246
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-24 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Saltmarsh common
yellowthroat
(Geothlypis trichas
sinuosa)
– – BCC,
SSC
Breeds in salt marshes of
San Francisco Bay; winters
San Francisco south along
coast to San Diego County.
Nesting: March-July
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Yellow warbler
(Setophaga petechia)
– – SSC Breeding range includes
most of California, except
Central Valley (isolated
breeding locales on Valley
floor, Stanislaus, Colusa, and
Butte counties), Sierra
Nevada range above tree
line, and southeastern
deserts. Nesting habitat
includes riparian vegetation
near streams and meadows.
Winters in Mexico south to
South America.
Nesting: May-August
Absent. There is no suitable
breeding habitat in or
adjacent to the BSA.
Mammals
Pallid bat
(Antrozous pallidus)
– – SSC Crevices in rocky outcrops
and cliffs, caves, mines, trees
(e.g. basal hollows of
redwoods, cavities of oaks,
exfoliating pine and oak
bark, deciduous trees in
riparian areas, and fruit trees
in orchards). Also roosts in
various human structures
such as bridges, barns,
porches, bat boxes, and
human occupied as well as
vacant buildings (WBWG
2024).
Survey Period: AprilSeptember
Absent. There is no suitable
roosting habitat in the BSA.
Attachment 2 Agenda Report Page 247
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-25 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Townsend's big-eared
bat
(Corynorhinus
townsendii)
– – SSC It has been reported in a
wide variety of habitat types
ranging from sea level to
3,300 meters. Habitat
associations include:
coniferous forests, mixed
meso-phytic forests, deserts,
native prairies, riparian
communities, active
agricultural areas, and
coastal habitat types.
Roosting can occur within
caves, mines, buildings, rock
crevices, trees.
Survey Period: AprilSeptember
Absent. There is no suitable
roosting habitat in the BSA.
Western mastiff bat
(Eumops perotis
californicus)
– – SSC Maternity roosts found in
exfoliating rock on cliffs, and
less frequently in similar
crevices in large boulders
and buildings (WBWG 2024).
Survey Period: AprilSeptember
Absent. There is no suitable
roosting habitat in the BSA.
San Pablo vole
(Microtus californicus
sanpabloensis)
– – SSC Salt marshes of San Pablo
Creek, on the south shore of
San Pablo Bay. Survey
Period: any season
Absent. There is no suitable
habitat in the BSA.
San Francisco duskyfooted woodrat
(Neotoma fuscipes
annectens)
– – SSC Dense chaparral, mixed
deciduous forest with thick
understory, coniferous
forest, and coastal sage
scrub (Reid 2006). Builds
large houses that are made
of twigs, leaves, and other
debris (Reid 2006).
Survey Period: Any Season
Absent. There is no suitable
habitat in the BSA.
Attachment 2 Agenda Report Page 248
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-26 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
Big free-tailed bat
(Nyctinomops
macrotis)
– – SSC It roosts mainly in the
crevices of rocks in cliff
situations, although there is
some documentation of
roosting in buildings, caves,
and tree cavities (WBWG
2024). Survey Period: AprilSeptember
Absent. There is no suitable
roosting habitat in the BSA.
Salt-marsh harvest
mouse
(Reithrodontomys
raviventris)
FE CE CFP Saline emergent marsh.
Survey Period: Any season
Absent. There is no suitable
habitat in the BSA.
Alameda Island mole
(Scapanus latimanus
parvus)
– – SSC Only known from Alameda
Island. Found in annual and
perennial grassland.
Absent. There is no suitable
habitat in the BSA.
Salt-marsh wandering
shrew
(Sorex vagrans
halicoetes)
– – SSC Salt marshes of the south
arm of San Francisco Bay.
Survey Period: Any season
Absent. There is no suitable
habitat in the BSA.
American badger
(Taxidea taxus)
– – SSC Drier open stages of most
shrub, forest, and
herbaceous habitats with
friable soils.
Survey Period: Any season
Absent. There is no suitable
habitat in the BSA.
Status Codes
FESA Federal Endangered Species Act
CESA California Endangered Species Act
FE FESA listed, Endangered
FT FESA listed, Threatened
FPT Formally Proposed for FESA listing as Threatened
FC Candidate for FESA listing as Threatened or Endangered BCC USFWS Bird of Conservation Concern (USFWS 2021)
CE CESA- or NPPA listed, Endangered
CT CESA- or NPPA-listed, Threatened
CR CESA- or NPPA-listed, Rare
CC Candidate for CESA listing as Endangered or Threatened CFP California Fish and Game Code Fully Protected Species (§ 3511-birds, § 4700-mammals, §5050- reptiles/amphibians)
SSC CDFW Species of Special Concern
CDFW
WL
CDFW Watch List
1A CRPR/Presumed extinct
Attachment 2 Agenda Report Page 249
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
4-27 DRAFT
2023-080
Table 2. Potentially Occurring Special–Status Species
Common Name
(Scientific Name)
Status
Habitat Description/
FESA Species Ecology Potential to Occur Onsite
CESA/
NPPA Other
1B CRPR/Rare or Endangered in California and elsewhere
2B CRPR/Plants rare, threatened, or endangered in California but more common elsewhere
0.1 Threat Rank/Seriously threatened in California (over 80% of occurrences threatened / high degree and immediacy of threat)
0.2 Threat Rank/Moderately threatened in California (20-80% occurrences threatened / moderate degree and immediacy of threat)
0.3 Threat Rank/Not very threatened in California (<20% of occurrences threatened / low degree and immediacy of threat or no current threats known)
Delisted Formally Delisted
No special-status species area expected to occur in the BSA, due to absence of natural vegetation communities, the developed setting, and disturbances caused by the presence of vehicle traffic, pedestrians, and domestic dogs and cats.
4.7 Critical Habitat or Essential Fish Habitat
There is no designated Critical Habitat within the BSA (USFWS 2024b). Based on the literature review, the BSA may contain anadromous fish critical habitat for California Central Coast Distinct Population Segment (DPS) steelhead and Southern DPS green sturgeon, and Essential Fish Habitat for coho and Chinook salmon (NOAA 2024b). However, the field reconnaissance site visit on February 15, 2024 confirmed that there is no suitable aquatic habitat in the BSA.
4.8 Wildlife Movement Corridors and Nursery Sites
There are no known migratory corridors and none are expected to occur due to the developed setting within the BSA. The BSA is not mapped as an area of interest under the California Essential Habitat Connectivity Project (CDFW 2024). There is no suitable habitat for nursery sites (e.g., deer fawning grounds, waterbird rookeries).
4.9 City of Piedmont Heritage Trees
There are no designated Heritage Trees located in the vicinity of the BSA.
Attachment 2 Agenda Report Page 250
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
5-1 DRAFT
2023-080
5.0 IMPACT ASSESSMENT AND RECOMMENDATIONS
This section specifically addresses questions raised by the Biological Resources section of the Environmental Checklist Form in Appendix G of the CEQA Guidelines.
5.1 California Environmental Quality Act Checklist Criteria IV(a) – SpecialStatus Species Would the Project:
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
There are no potentially occurring special-status species in the BSA. The Project is not expected to have adverse effects on special-status species. While not considered special-status species as defined, birds protected under the MBTA could potentially nest in close proximity to the Project. It is expected that birds nesting in this developed setting have become acclimated to human presence and disturbances.
Consequently, any potential effects to MBTA protected birds should be less than significant.
5.2 California Environmental Quality Act Checklist Criteria IV(b) – Sensitive Natural Communities
Would the Project:
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
There are no riparian habitats or sensitive natural communities in the BSA. The Project is not expected to have adverse effects on riparian habitat or sensitive natural communities.
5.3 California Environmental Quality Act Checklist Criteria IV(c) – Aquatic Resources
Would the Project:
c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Attachment 2 Agenda Report Page 251
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
5-2 DRAFT
2023-080
There are no aquatic resources in the BSA. The Project is not expected to have adverse effects on aquatic resources.
5.4 CEQA Checklist Criteria IV(d) – Movement Corridors and Nursery Sites Would the Project:
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
There are no migratory corridors or nursery sites in the BSA. The Project is not expected to have adverse effects on migratory corridors or nursery sites.
5.5 California Environmental Quality Act Checklist Criteria IV(e) – Conflicts with Local Policies or Ordinances
Would the Project:
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
The Project is not expected to conflict with local policies or ordinances.
5.6 California Environmental Quality Act Checklist Criteria IV(f) – Conflicts with Conservation Plans
Would the Project:
f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? The Project is not subject to provisions of an adopted HCP, NCCP, or other approved local, regional, or state HCP.
Attachment 2 Agenda Report Page 252
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
6-1 DRAFT
2023-080
6.0 REFERENCES
California Department of Fish and Wildlife (CDFW). 2024. RareFind Natural Diversity Data Base Program.
Version 5. California Department of Fish and Wildlife. California Natural Diversity Database.
Available at: https://wildlife.ca.gov/Data/CNDDB/Maps-and-Data. (Accessed February 2024). _____. 2023. California Natural Community List. Dated June 1, 2023. Available online:
https://wildlife.ca.gov/Data/VegCAMP/Natural-Communities#natural%20communities%20lists.
Accessed February 2024.
California Native Plant Society (CNPS). 2024a. A Manual of California Vegetation, Online Edition. California Native Plant Society, Sacramento, CA. Available online at: https://vegetation.cnps.org/. Accessed February 2024.
_____. 2024b. Rare Plant Inventory (online edition, v9-01 1.5). California Native Plant Society. Sacramento, CA. Available online: http://www.rareplants.cnps.org/. Accessed February 2024.
City of Piedmont General Plan. 2009 (amended 2020). Available online:
https://piedmont.ca.gov/services___departments/planning___building/general_plan___other_policy _documents. Accessed February 2024.
Jepson Flora Project (eds.) 2024. .Jepson eFlora. Available online: https://ucjeps.berkeley.edu/eflora/.
Accessed February 2024.
National Marine Fisheries Service (NMFS). 2022. National Marine Fisheries Service West Coast Region.
Intersection of USGS 7.5” Topographic Quadrangles with NOAA Fisheries ESA List Species, Critical Habitat, Essential Fish Habitat, and MMPA Species Data with California. Available online:
https://svctenvims.dot.ca.gov/bio_link/. Accessed February 2024.
National Oceanic and Atmospheric Administration (NOAA). 2024a. National Centers for Environmental Information, U.S. climate Normals Quick Access, 1991-2020, Berkeley, CA. Available online:
https://www.ncei.noaa.gov/access/us-climate-normals/#dataset=normalsannualseasonal&timeframe=30&location=CA&station=USC00040693. Accessed February 2024.
_____.2024b. NOAA Essential Fish Habitat Mapper. Available online at:
https://www.fisheries.noaa.gov/resource/map/essential-fish-habitat-mapper. Accessed February 2024.
_____. 2022. National Marine Fisheries Service West Coast Region. Intersection of USGS 7.5” Topographic Quadrangles with NOAA Fisheries ESA List Species, Critical Habitat, Essential Fish Habitat, and MMPA Species Data with California. Available online: https://svctenvims.dot.ca.gov/bio_link/.
Accessed February 2024.
Attachment 2 Agenda Report Page 253
Biological Resources Assessment
ECORP Consulting, Inc.
Piedmont Sanitary Sewer Rehab Phase 6
6-2 DRAFT
2023-080
Natural Resources Conservation Service (NRCS), U.S. Geological Survey (USGS), and U.S. Environmental Protection Agency (USEPA). 2016. Watershed Boundary Dataset for California. https://datageteway.nrcs.usda.gov. Accessed February 2024.
Rosenfield, R. N., K. K. Madden, J. Bielefeldt, and O. E. Curtis. 2020. Cooper's Hawk (Accipiter cooperii), version 1.0. In Birds of the World (P. G. Rodewald, Editor). Cornell Lab of Ornithology, Ithaca, NY, USA. https://doi.org/10.2173/bow.coohaw.01.
U.S. Fish and Wildlife Service (USFWS). 2024. Information for Planning and Consultation (IPaC) Species List for the Biological Study Area. Available online: https://ipac.ecosphere.fws.gov/location/index.
Accessed February 2024.
_____. 2021. Birds of Conservation Concern 2021. USFWS, Division of Migratory Bird Management, Arlington, Virginia. (Online version available at
https://www.fws.gov/migratorybirds/pdf/management/birds-of-conservation-concern2021.pdf.
U.S. Geological Survey (USGS). 1997. “Oakland East, California” 7.5-minute Quadrangle. United States Department of the Interior, Geological Survey, Denver.
Western Bat Working Group (WBWG). 2024. Western Bat Species Accounts. Available online:
https://wbwg.org/western-bat-species/. Accessed February 2024.
Attachment 2 Agenda Report Page 254
LIST OF APPENDICES
Appendix A – Results of Database Queries
Attachment 2 Agenda Report Page 255
APPENDIX A
Results of Database Queries
Attachment 2 Agenda Report Page 256
CALIFORNIA
NATIVE PLANT SOCIETY
CNPS Rare Plant Inventory
Search Results
67 matches found. Click on scientific name for details
Search Criteria: 9-Quad include [3712272:3712282:3712281:3712283:3712262:3712271:3712261:3712273:3712263] 4 SCIENTIFIC NAME COMMON NAME FAMILY
Amsinckia lunaris bent-flowered Boraginaceae
fiddleneck
Androsace elongata California Primulaceae
~p.acuta androsace
Anomob,yum slender silver Bryaceae
julaceum moss
ArctostaP-!Jy.w. pallid manzanita Ericaceae
f}.allida
Astragalus tener alkali milk-vetch Fabaceae
var. tener
Balsamorhiza big-scale Asteraceae
macro/eW,S_ balsam root
8/ef}.harizonia big tarplant Asteraceae
f}.iumosa
Calochortus Mt. Diablo fairy- Liliaceae
f}.Ulchellus lantern
Calochortus Oakland star- Liliaceae
uml,.1:.llat!,!i tulip
Cal}'2tegjg_ coastal bluff Convolvulaceae
f}.Urf}.urata ssp. morning-glory
saxicola
LIFEFORM
annual herb
annual herb
moss
perennial
evergreen shrub
annual herb
perennial herb
annual herb
perennial
bulbiferous herb
perennial
bulbiferous herb
perennial herb
BLOOMING FED
PERIOD LIST
CA RARE
STATE GLOBAL STATE PLANT
LIST RANK RANK RANK
Mar-Jun None None G3 S3 1B.2
Mar-Jun None None GS? S3S4 4.2
T3T4
None None GS? S2 4.2
Dec-Mar FT CE G1 S1 1 B.1
Mar-Jun None None G2T1 S1 1B.2
Mar-Jun None None GZ S2 1 B.2
Jul-Oct None None G1G2 S1S2 1 B.1
Apr-Jun None None GZ S2 1 B.2
Mar-May None None G3? S3? 4.2
(Mar)Apr- None None G4T2T3 S2S3 1B.2
Sep
CA DATE
ENDEMIC ADDED PHOTO
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
1974-
01-01
1994-
01-01
2001-
01-01
1974-
01-01
1994-
01-01
1974-
01-01
1994-
01-01
1974-
01-01
1980-
01-01
2001-
01-01
© 2011 Neal
Kramer
© 2008Aaron
Schusteff
© 2013 Scot
Loring
No Photo
Available
No Photo
Available
©1998 Dean
Wm. Taylor
No Photo
Available
No Photo
Available
No Photo
Available
No Photo
Available
Attachment 2 Agenda Report Page 257
(qreK c.omQsq bristly sedge Cyperaceae perennial May-Sep None None GS S2 2B.1 1994- rhizomatous herb 01-01
Dean Wm.
Taylor 1997
(astilleia ambigw johnny-nip Orobanchaceae annual herb Mar-Aug None None G4T 4 S3S4 4.2 2009- var. ambigua (hemiparasitic) 02-04
©2011 Dylan
Neubauer
Centromadia P-fil[Y.i Congdon's Asteraceae annual herb May- None None G3T2 S2 1 B.1 Yes 1994- ~P--congdonii tarplant Oct(Nov) 01-01 No Photo
Available
Chlorowf on Point Reyes salty Orobanchaceae annual herb Jun-Oct None None G4?T2 S2 1B.2 1974- maritimum ssi;1. bird's-beak (hemiparasitic) 01-01
p_alustre
©2017 John
Doyen
Chloropymn mQl/e soft salty bird's- Orobanchaceae annual herb Jun-Nov FE CR G2T1 S1 1 B.2 Yes 1974- ~i;1.molle beak (hemiparasitic) 01-01
© 2014John
Doyen
Chorizanthe San Francisco Polygonaceae annual herb Apr- None None G2T1 S1 1 B.2 Yes 1994- cusp_idata var. Bay spineflower Jul(Aug) 01-01 No Photo wpidata Available
Cb.orizaat/J.e CQb!JS.tq robust Polygonaceae annual herb Apr-Sep FE None G2T1 S1 1 B.1 Yes 1980- var. robusta spineflower 01-01 No Photo
Available
Cicuto macu/ata Bolander's water- Apiaceae perennial herb Jul-Sep None None G5T4T5 S2? 2B.1 1974- v,!r. bQlqng_eri hemlock 01-01
© 2007
Doreen L
Smith
Qrsiy_m and.rewsii Franciscan thistle Asteraceae perennial herb Mar-Jul None None G3 S3 1 B.2 Yes 1974- 01-01 No Photo
Available
Clarkia concinna Santa Clara red Onagraceae annual herb (Apr}May- None None G5?T3 S3 4.3 Yes 1994- ~P--automixa ribbons Jun(Jul) 01-01 No Photo
Available
Qm}gQ_{Iandscana Presidio clarkia Onagraceae annual herb May-Jul FE CE G1 S1 1 B.1 Yes 1974- 01-01 No Photo
Available
Dirca occidentalis western Thymelaeaceae perennial Jan- None None G2 S2 1 B.2 Yes 1974- leatherwood deciduous shrub Mar(Apr) 01-01
© 2017 Steve
Matson
ftiQgQilJJfil Tiburon Polygonaceae annual herb May-Sep None None G5T2 S2 1B.2 Yes 1974- /y_teQIY.m var. buckwheat 01-01 No Photo
rnnim!m. Available
Iry.ngiYinjgp_sonii Jepson's coyote- Apiaceae perennial herb Apr-Aug None None G2 52 1B.2 Yes 2016- thistle 09-13 No Photo
Available
Attachment 2 Agenda Report Page 258
£ryJ/JrQn1h£. cut-leaved Phrymaceae annual herb
laciniata monkeyflower
ExtriR@}oaguinana San Joaquin Chenopodiaceae annual herb spearscale
Fissidens minute pocket Fissidentaceae moss
/2@~ moss
Fritillaria agrestis stinkbells Liliaceae perennial
bulbiferous herb
Fritillaria liliaru1. fragrant fritillary Liliaceae perennial bulbiferous herb
yJ1jgsg~p_, blue coast gilia Polemoniaceae annual herb
chamissonis
Gilia mille[oliata dark-eyed gilia Polemoniaceae annual herb Helianthella Diablo Asteraceae perennial herb
~ helianthella
He.mizQnig_ ._g_ng.eillJ. congested- Asteraceae annual herb ~fMQ!lg.eillJ. headed hayfield
tarplant
Hesp_erevax hogwallow Asteraceae annual herb
caulescens starfish
Heteranthera dubia water star-grass Pontederiaceae perennial herb (aquatic)
Apr-Jul None None G4 S4 4.3 Yes 1974-
01-01
Apr-Oct None None G2 S2 1 B.2 Yes 1988-
01-01
None None G3? S2 1 B.2 2001-
01-01
Mar-Jun None None G3 S3 4.2 Yes 1980-
01-01
Feb-Apr None None G2 S2 1 B.2 Yes 1974-
01-01
Apr-Jul None None G5T2 S2 1 B.1 Yes 2001-
01-01
Apr-Jul None None G2 S2 1B.2 2001-
01-01
Mar-Jun None None G2 S2 1B.2 Yes 1974-
01-01
Apr-Nov None None G5T2 S2 1 B.2 Yes 1988-
01-01
Mar-Jun None None G3 S3 4.2 Yes 2001-
01-01
Jul-Oct None None GS S2 2B.2 2013-
10-10
© 2017 Steven
Perry
No Photo
Available
©2021 Scot
Loring
© 2016Aaron
Schusteff
© 2004Carol
W.Witham
© 2017 John
Doyen
© 2017 John
Doyen
© 2013
Christopher
Bronny
© 2015
Vernon Smith
© 2017 John
Doyen
©2010 LouisM. Landry
Attachment 2 Agenda Report Page 259
tiil.1is,us. las/Qrnff2Q5. woolly rose- Malvaceae
var. occidentalis mallow
Hoita strobilina Loma Prieta hoita Fabaceae
~p_ha Santa Cruz
macradenia tarplant
Horkelia cuneata Kellogg's
V,!r ~erice_a horkelia
Iris longjp_etala coast iris
lsocoma arguta Carquinez
golden bush
-1.Yglans cali[ornica Southern
California black
walnut
Lasthe_niQ ,QniU9!ffil Contra Costa
goldfields
J.Qxia c;arnQsa beach layia
fgp_tosip_hon aureus bristly
leptosiphon
fgp_tosip_hon
grandiflorus
large-flowered
leptosiphon
Asteraceae
Rosaceae
lridaceae
Asteraceae
Juglandaceae
Asteraceae
Asteraceae
Polemoniaceae
Polemoniaceae
perennial Jun-Sep
rhizomatous herb
(emergent)
perennial herb MayJul(AugOct)
annual herb Jun-Oct
perennial herb Apr-Sep
perennial Marrhizomatous herb May(Jun)
perennial shrub Aug-Dec
perennial Mar-Aug
deciduous tree
annual herb Mar-Jun
annual herb Mar-Jul
annual herb Apr-Jul
annual herb Apr-Aug
None None G5T3 S3 1B.2 Yes 1974-
01-01
None None G2? S2? 1 B.1 Yes 2001-
01-01
FT CE G1 S1 1 B.1 Yes 1974-
01-01
None None G4T1? S1? 1 B.1 Yes 1988-
01-01
None None G3 S3 4.2 Yes 2006-
10-12
None None G1 S1 1 B.1 Yes 1994-
01-01
None None G4 S4 4.2 Yes 1994-
01-01
FE None G1 S1 1 B.1 Yes 1974-
01-01
FT CE G2 S2 1 B.1 1988-
01-01
None None G4? S4? 4.2 Yes 1994-
01-01
None None G3G4 S3S4 4.2 Yes 1994-
01-01
© 2020 Steven
Perry
© 2004Janell
Hillman
© 2011 Dylan
Neubauer
© 2018 Neal
Kramer
© 2014Aaron
Schusteff
No Photo
Available
© 2020Zoya
Akulova
© 2013 Neal
Kramer
© 2007 Aaron
Schusteff
© 2007 Len
Blumin
© 2003
Doreen L.
Smith
Attachment 2 Agenda Report Page 260
rose leptosiphon Polemoniaceae annual herb
rosaceus
Lessingia hololeuca woolly-headed Asteraceae annual herb lessingia
Malacothamnus Hall's bush- Malvaceae perennial
hallii mallow deciduous shrub
Meconel/a oregQllil Oregon Papaveraceae annual herb
meconella
Monolop_ia gracilens woodland Asteraceae annual herb
woollythreads
Oenothera deltoides Antioch Dunes Onagraceae perennial herb ~p.howellii eveningprimrose
E]p_eria michaelii Michael's rein Orchidaceae perennial herb orchid
EJggiobothrvs. Choris' Boraginaceae annual herb
c.hor~ianY.S. v,lr popcornflower
chorisianus
Plagiobothrvs_ San Francisco Boraginaceae annual herb
gjff_usus popcornflower
Plagiobothr'ld hairless Boraginaceae annual herb
glfilli:[ popcorn flower
EQ{ygonum Marin knotweed Polygonaceae annual herb
marinense
Ranunculus lobbii Lobb's aquatic Ranunculaceae annual herb buttercup (aquatic)
SQ.nirnlg_ mg_ritimg_ adobe sanicle Apiaceae perennial herb Sp_ergularia long-styled Caryophyllaceae perennial herb macrotheca var. sand-spurrey
longjgy.Jg
Apr-Jul None None G1 51
Jun-Oct None None G2G3 5253
(Apr)May- None None G2 52
Sep(Oct)
Mar-Apr None None G2G3 52
(Feb)Mar- None None G3 53
Jul
Mar-Sep FE CE GST1 51
Apr-Aug None None G3 53
Mar-Jun None None G3T1Q 51
Mar-Jun None CE G1Q 51
Mar-May None None GX SX
(Apr)May- None None G2Q 52
Aug(Oct)
Feb-May None None G4 53
Feb-May None CR G2 52
Feb-May None None GST2 52
1 B.1
3 1B.2
1 B.1
1B.2
1 B.1
4.2 1B.2
1 B.1
1A
3.1 4,2
1 B.1
1B.2
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2001-
01-01
1994-
01-01
1974-
01-01
1974-
01-01
2010-
04-06
1974-
01-01
1984-
01-01
1984-
01-01
1974-
01-01
1974-
01-01
1974-
01-01
1974-
01-01
1974-
01-01
2017-
06-16
© 2013 Aaron
Schusteff
© 2015 Aaron
Schusteff
© 2017 Keir
Morse
© 2021 Scot
Loring
© 2016
Richard
Spellenberg
No Photo
Available
No Photo
Available
No Photo
Available
No Photo
Available
No Photo
Available
No Photo
Available
No Photo
Available
No Photo
Available
No Photo
Available
Attachment 2 Agenda Report Page 261
Stre~ most beautiful Brassicaceae annual herb (Mar)Apr- None None G2T2 S2 1B.2 Yes 1988- albidus ssP-, jewelflower Sep(Oct) 01-01
p_eramoenus © 1994 Robert
E. Preston,
Ph.D.
Stuckenia filjf.ormis northern slender Potamogetonaceae perennial May-Jul None None GSTS S2S3 2B.2 1994- ~p. alp_ina pondweed rhizomatous herb 01-01
(aquatic)
Dana York
(2016)
Suaeda califg_rnica California Chenopodiaceae perennial Jul-Oct FE None G1 S1 1 B.1 Yes 1988- seablite evergreen shrub 01-01 No Photo
Available
Sy.mp__hyotrichum Suisun Marsh Asteraceae perennial (Apr)May- None None G2 S2 1B.2 Yes 1974- lentum aster rhizomatous herb Nov 01-01 No Photo
Available
Ir]f.olium saline clover Fabaceae annual herb Apr-Jun None None G2 S2 1B.2 Yes 2001- hy.sirsJ,milum 01-01
© 2005 Dean
Wm Taylor
Ir]P-hY.5.aria San Francisco Orobanchaceae annual herb Apr-Jun None None G2? S2? 1B.2 Yes 1974- fjoribundo owl's-clover 01-01 No Photo
Available
Viburnum oval-leaved Viburnaceae perennial May-Jun None None G4GS S3? 2B.3 1974- ellip_ticum viburnum deciduous shrub 01-01
© 2006Tom
Engstrom
Showing 1 to 67 of 67 entries
Suggested Citation:
California Native Plant Society, Rare Plant Program. 2024. Rare Plant Inventory (online edition, v9.5). Website https://www.rareplants.cnps.org [accessed 12 February 2024].
Attachment 2 Agenda Report Page 262
Element Code Species Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
AAAAA01181 Ambystoma californiense pop. 1
California tiger salamander - central California DPS
Threatened Threatened G2G3T3 S3 WL
AAABH01022 Rana draytonii
California red-legged frog
Threatened None G2G3 S2S3 SSC
AAABH01054 Rana boylii pop. 4
foothill yellow-legged frog - central coast DPS
Threatened Endangered G3T2 S2
ABNFD01020 Nannopterum auritum
double-crested cormorant
None None G5 S4 WL
ABNGA04010 Ardea herodias
great blue heron
None None G5 S4
ABNGA06030 Egretta thula
snowy egret
None None G5 S4
ABNGA11010 Nycticorax nycticorax
black-crowned night heron
None None G5 S4
ABNJB05035 Branta hutchinsii leucopareia
cackling (=Aleutian Canada) goose
Delisted None G5T3 S3 WL
ABNKC06010 Elanus leucurus
white-tailed kite
None None G5 S3S4 FP
ABNKC10010 Haliaeetus leucocephalus
bald eagle
Delisted Endangered G5 S3 FP
ABNKC11011 Circus hudsonius
northern harrier
None None G5 S3 SSC
ABNKC12020 Accipiter striatus
sharp-shinned hawk
None None G5 S4 WL
ABNKC12040 Accipiter cooperii
Cooper's hawk
None None G5 S4 WL
ABNKC22010 Aquila chrysaetos
golden eagle
None None G5 S3 FP
ABNKD06071 Falco peregrinus anatum
American peregrine falcon
Delisted Delisted G4T4 S3S4
ABNME01010 Coturnicops noveboracensis
yellow rail
None None G4 S2 SSC
ABNME03041 Laterallus jamaicensis coturniculus
California black rail
None Threatened G3T1 S2 FP
ABNME05011 Rallus obsoletus obsoletus
California Ridgway's rail
Endangered Endangered G3T1 S2 FP
ABNNB03031 Charadrius nivosus nivosus
western snowy plover
Threatened None G3T3 S3 SSC
Query Criteria: Quad<span style='color:Red'> IS </span>(Oakland East (3712272)<span style='color:Red'> OR </span>Briones Valley (3712282)<span style='color:Red'> OR </span>Walnut Creek (3712281)<span style='color:Red'> OR </span>Richmond (3712283)<span style='color:Red'> OR </span>San Leandro (3712262)<span style='color:Red'> OR </span>Las Trampas Ridge (3712271)<span style='color:Red'> OR </span>Hayward (3712261)<span style='color:Red'> OR </span>Oakland West (3712273)<span style='color:Red'> OR </span>Hunters Point (3712263))
Report Printed on Monday, February 12, 2024
Commercial Version -- Dated February, 2 2024 -- Biogeographic Data Branch Page 1 of 6 Information Expires 8/2/2024
Selected Elements by Element Code
California Department of Fish and Wildlife
California Natural Diversity Database
Attachment 2 Agenda Report Page 263
Element Code Species Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
ABNNM08020 Hydroprogne caspia
Caspian tern
None None G5 S4
ABNNM08103 Sternula antillarum browni
California least tern
Endangered Endangered G4T2T3Q S2 FP
ABNNM14010 Rynchops niger
black skimmer
None None G5 S2 SSC
ABNSB10010 Athene cunicularia
burrowing owl
None None G4 S2 SSC
ABPBX03010 Setophaga petechia
yellow warbler
None None G5 S3 SSC
ABPBX1201A Geothlypis trichas sinuosa
saltmarsh common yellowthroat
None None G5T3 S3 SSC
ABPBXA301K Melospiza melodia maxillaris
Suisun song sparrow
None None G5T3 S2 SSC
ABPBXA301S Melospiza melodia pusillula
Alameda song sparrow
None None G5T2T3 S2 SSC
ABPBXA301W Melospiza melodia samuelis
San Pablo song sparrow
None None G5T2 S2 SSC
ABPBXB3010 Xanthocephalus xanthocephalus
yellow-headed blackbird
None None G5 S3 SSC
AFCAA01031 Acipenser medirostris pop. 1
green sturgeon - southern DPS
Threatened None G2T1 S1
AFCHB03010 Spirinchus thaleichthys
longfin smelt
Proposed
Endangered
Threatened G5 S1
AFCQB07010 Archoplites interruptus
Sacramento perch
None None G1 S1 SSC
AFCQN04010 Eucyclogobius newberryi
tidewater goby
Endangered None G3 S3
AMABA01071 Sorex vagrans halicoetes
salt-marsh wandering shrew
None None G5T1 S1 SSC
AMABB02031 Scapanus latimanus parvus
Alameda Island mole
None None G5T1Q SH SSC
AMACC02010 Lasionycteris noctivagans
silver-haired bat
None None G3G4 S3S4
AMACC05032 Lasiurus cinereus
hoary bat
None None G3G4 S4
AMACC08010 Corynorhinus townsendii
Townsend's big-eared bat
None None G4 S2 SSC
AMACC10010 Antrozous pallidus
pallid bat
None None G4 S3 SSC
AMACD02011 Eumops perotis californicus
western mastiff bat
None None G4G5T4 S3S4 SSC
Report Printed on Monday, February 12, 2024
Commercial Version -- Dated February, 2 2024 -- Biogeographic Data Branch Page 2 of 6 Information Expires 8/2/2024
Selected Elements by Element Code
California Department of Fish and Wildlife
California Natural Diversity Database
Attachment 2 Agenda Report Page 264
Element Code Species Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
AMACD04020 Nyctinomops macrotis
big free-tailed bat
None None G5 S3 SSC
AMAFD03061 Dipodomys heermanni berkeleyensis
Berkeley kangaroo rat
None None G4T1 S2
AMAFF02040 Reithrodontomys raviventris
salt-marsh harvest mouse
Endangered Endangered G1G2 S3 FP
AMAFF08082 Neotoma fuscipes annectens
San Francisco dusky-footed woodrat
None None G5T2T3 S2S3 SSC
AMAFF11034 Microtus californicus sanpabloensis
San Pablo vole
None None G5T1T2 S1S2 SSC
AMAJF04010 Taxidea taxus
American badger
None None G5 S3 SSC
ARAAD02030 Emys marmorata
western pond turtle
Proposed
Threatened
None G3G4 S3 SSC
ARACC01020 Anniella pulchra
Northern California legless lizard
None None G3 S2S3 SSC
ARADB21031 Masticophis lateralis euryxanthus
Alameda whipsnake
Threatened Threatened G4T2 S2
CTT37C10CA Northern Maritime Chaparral
Northern Maritime Chaparral
None None G1 S1.2
CTT42110CA Valley Needlegrass Grassland
Valley Needlegrass Grassland
None None G3 S3.1
CTT42130CA Serpentine Bunchgrass
Serpentine Bunchgrass
None None G2 S2.2
CTT52110CA Northern Coastal Salt Marsh
Northern Coastal Salt Marsh
None None G3 S3.2
IICOL02101 Cicindela hirticollis gravida
sandy beach tiger beetle
None None G5T2 S2
IIDIP07010 Efferia antiochi
Antioch efferian robberfly
None None G1G2 S1S2
IIHYM24252 Bombus occidentalis
western bumble bee
None Candidate
Endangered
G3 S1
IIHYM24380 Bombus caliginosus
obscure bumble bee
None None G2G3 S1S2
IIHYM24480 Bombus crotchii
Crotch bumble bee
None Candidate
Endangered
G2 S2
IILEPK4055 Euphydryas editha bayensis
Bay checkerspot butterfly
Threatened None G5T1 S3
IILEPP2012 Danaus plexippus plexippus pop. 1
monarch - California overwintering population
Candidate None G4T1T2Q S2
ILARA47040 Microcina leei
Lee's micro-blind harvestman
None None G1 S1
Report Printed on Monday, February 12, 2024
Commercial Version -- Dated February, 2 2024 -- Biogeographic Data Branch Page 3 of 6 Information Expires 8/2/2024
Selected Elements by Element Code
California Department of Fish and Wildlife
California Natural Diversity Database
Attachment 2 Agenda Report Page 265
Element Code Species Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
ILARA47050 Microcina lumi
Lum's micro-blind harvestman
None None G1 S1
IMGASC2362 Helminthoglypta nickliniana bridgesi
Bridges' coast range shoulderband
None None G3T1 S1S2
IMGASJ7040 Tryonia imitator
mimic tryonia (=California brackishwater snail)
None None G2 S2
IMGASJ9020 Pomatiopsis californica
Pacific walker
None None G1 S1
NBMUS2W0U0 Fissidens pauperculus
minute pocket moss
None None G3? S2 1B.2
NBMUS80010 Anomobryum julaceum
slender silver moss
None None G5? S2 4.2
PDAPI0M051 Cicuta maculata var. bolanderi
Bolander's water-hemlock
None None G5T4T5 S2? 2B.1
PDAPI0Z130 Eryngium jepsonii
Jepson's coyote-thistle
None None G2 S2 1B.2
PDAPI1Z0D0 Sanicula maritima
adobe sanicle
None Rare G2 S2 1B.1
PDAST11061 Balsamorhiza macrolepis
big-scale balsamroot
None None G2 S2 1B.2
PDAST1C011 Blepharizonia plumosa
big tarplant
None None G1G2 S1S2 1B.1
PDAST2E050 Cirsium andrewsii
Franciscan thistle
None None G3 S3 1B.2
PDAST4M020 Helianthella castanea
Diablo helianthella
None None G2 S2 1B.2
PDAST4R0P1 Centromadia parryi ssp. congdonii
Congdon's tarplant
None None G3T2 S2 1B.1
PDAST4R0W1 Hemizonia congesta ssp. congesta
congested-headed hayfield tarplant
None None G5T2 S2 1B.2
PDAST4X020 Holocarpha macradenia
Santa Cruz tarplant
Threatened Endangered G1 S1 1B.1
PDAST57050 Isocoma arguta
Carquinez goldenbush
None None G1 S1 1B.1
PDAST5L040 Lasthenia conjugens
Contra Costa goldfields
Endangered None G1 S1 1B.1
PDAST5N010 Layia carnosa
beach layia
Threatened Endangered G2 S2 1B.1
PDAST6G010 Monolopia gracilens
woodland woollythreads
None None G3 S3 1B.2
PDBOR01070 Amsinckia lunaris
bent-flowered fiddleneck
None None G3 S3 1B.2
Report Printed on Monday, February 12, 2024
Commercial Version -- Dated February, 2 2024 -- Biogeographic Data Branch Page 4 of 6 Information Expires 8/2/2024
Selected Elements by Element Code
California Department of Fish and Wildlife
California Natural Diversity Database
Attachment 2 Agenda Report Page 266
Element Code Species Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
PDBOR0V061 Plagiobothrys chorisianus var. chorisianus
Choris' popcornflower
None None G3T1Q S1 1B.2
PDBOR0V080 Plagiobothrys diffusus
San Francisco popcornflower
None Endangered G1Q S1 1B.1
PDBOR0V0B0 Plagiobothrys glaber
hairless popcornflower
None None GX SX 1A
PDBRA2G012 Streptanthus albidus ssp. peramoenus
most beautiful jewelflower
None None G2T2 S2 1B.2
PDCAR0W062 Spergularia macrotheca var. longistyla
long-styled sand-spurrey
None None G5T2 S2 1B.2
PDCHE041F3 Extriplex joaquinana
San Joaquin spearscale
None None G2 S2 1B.2
PDCHE0P020 Suaeda californica
California seablite
Endangered None G1 S1 1B.1
PDCON040D2 Calystegia purpurata ssp. saxicola
coastal bluff morning-glory
None None G4T2T3 S2S3 1B.2
PDCPR07080 Viburnum ellipticum
oval-leaved viburnum
None None G4G5 S3? 2B.3
PDERI04110 Arctostaphylos pallida
pallid manzanita
Threatened Endangered G1 S1 1B.1
PDFAB0F8R1 Astragalus tener var. tener
alkali milk-vetch
None None G2T1 S1 1B.2
PDFAB400R5 Trifolium hydrophilum
saline clover
None None G2 S2 1B.2
PDFAB5Z030 Hoita strobilina
Loma Prieta hoita
None None G2? S2? 1B.1
PDONA050A1 Clarkia concinna ssp. automixa
Santa Clara red ribbons
None None G5?T3 S3 4.3
PDONA050H0 Clarkia franciscana
Presidio clarkia
Endangered Endangered G1 S1 1B.1
PDONA0C0B4 Oenothera deltoides ssp. howellii
Antioch Dunes evening-primrose
Endangered Endangered G5T1 S1 1B.1
PDPAP0G030 Meconella oregana
Oregon meconella
None None G2G3 S2 1B.1
PDPGN04081 Chorizanthe cuspidata var. cuspidata
San Francisco Bay spineflower
None None G2T1 S1 1B.2
PDPGN040Q2 Chorizanthe robusta var. robusta
robust spineflower
Endangered None G2T1 S1 1B.1
PDPGN083S1 Eriogonum luteolum var. caninum
Tiburon buckwheat
None None G5T2 S2 1B.2
PDPGN0L1C0 Polygonum marinense
Marin knotweed
None None G2Q S2 3.1
Report Printed on Monday, February 12, 2024
Commercial Version -- Dated February, 2 2024 -- Biogeographic Data Branch Page 5 of 6 Information Expires 8/2/2024
Selected Elements by Element Code
California Department of Fish and Wildlife
California Natural Diversity Database
Attachment 2 Agenda Report Page 267
Element Code Species Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
PDPLM040B3 Gilia capitata ssp. chamissonis
blue coast gilia
None None G5T2 S2 1B.1
PDPLM04130 Gilia millefoliata
dark-eyed gilia
None None G2 S2 1B.2
PDPLM09180 Leptosiphon rosaceus
rose leptosiphon
None None G1 S1 1B.1
PDROS0W043 Horkelia cuneata var. sericea
Kellogg's horkelia
None None G4T1? S1? 1B.1
PDSCR0J0C3 Chloropyron maritimum ssp. palustre
Point Reyes salty bird's-beak
None None G4?T2 S2 1B.2
PDSCR2T010 Triphysaria floribunda
San Francisco owl's-clover
None None G2? S2? 1B.2
PDTHY03010 Dirca occidentalis
western leatherwood
None None G2 S2 1B.2
PMCYP032Y0 Carex comosa
bristly sedge
None None G5 S2 2B.1
PMLIL0D160 Calochortus pulchellus
Mt. Diablo fairy-lantern
None None G2 S2 1B.2
PMLIL0V0C0 Fritillaria liliacea
fragrant fritillary
None None G2 S2 1B.2
PMPON03010 Heteranthera dubia
water star-grass
None None G5 S2 2B.2
PMPOT03091 Stuckenia filiformis ssp. alpina
northern slender pondweed
None None G5T5 S2S3 2B.2
Record Count: 115
Report Printed on Monday, February 12, 2024
Commercial Version -- Dated February, 2 2024 -- Biogeographic Data Branch Page 6 of 6 Information Expires 8/2/2024
Selected Elements by Element Code
California Department of Fish and Wildlife
California Natural Diversity Database
Attachment 2 Agenda Report Page 268
IPaC U.S. Fish & Wildlife Service
IPaC resource list
This report is an automatically generated list of species and other resources such as critical habitat (collectively referred to as trust resources) under the U.S. Fish and Wildlife Service's (USFWS) jurisdiction that are known or expected to be on or near the project area referenced below. The list may also include trust resources that occur outside of the project area, but that could potentially be directly or indirectly affected by activities in the project area. However, determining the likelihood and extent of effects a project may have on trust resources typically requires gathering additional site-specific (e.g., vegetation/species surveys) and project-specific (e.g., magnitude and timing of proposed activities) information.
Below is a summary of the project information you provided and contact information for the USFWS office(s) with jurisdiction in the defined project area. Please read the introduction to each section that follows (Endangered Species, Migratory Birds, USFWS Facilities, and NWI Wetlands) for additional information applicable to the trust resources addressed in that section.
Location
Alameda County, California
Loca I office
Sacramento Fish And Wildlife Office
\. (916) 414-6600
Iii) (916) 414-6713
Federal Building
2800 Cottage Way, Room W-2605
Sacramento, CA 95825-1846
Attachment 2 Agenda Report Page 269
Endangered species
This resource list is for informational purposes only and does not constitute an analysis of project level impacts.
The primary information used to generate this list is the known or expected range of each species.
Additional areas of influence (AOI) for species are also considered. An AOI includes areas outside of the species range if the species could be indirectly affected by activities in that area (e.g., placing a dam upstream of a fish population even if that fish does not occur at the dam site, may indirectly impact the species by reducing or eliminating water flow downstream). Because species can move, and site conditions can change, the species on this list are not guaranteed to be found on or near the project area. To fully determine any potential effects to species, additional site-specific and project-specific information is often required.
Section 7 of the Endangered Species Act requires Federal agencies to "request of the Secretary information whether any species which is listed or proposed to be listed may be present in the area of such proposed action" for any project that is conducted, permitted, funded, or licensed by any Federal agency. A letter from the local office and a species list which fulfills this requirement can only be obtained by requesting an official species list from either the Regulatory Review section in IPaC (see directions below) or from the local field office directly.
For project evaluations that require USFWS concurrence/review, please return to the IPaC website and request an official species list by doing the following:
1. Draw the project location and click CONTINUE.
2. Click DEFINE PROJECT.
3. Log in (if directed to do so).
4. Provide a name and description for your project.
5. Click REQUEST SPECIES LIST.
Listed speciesl and their critical habitats are managed by the Ecological Services Program of the U.S.
Fish and Wildlife Service (USFWS) and the fisheries division of the National Oceanic and Atmospheric Administration (NOAA Fisheries2-).
Species and critical habitats under the sole responsibility of NOAA Fisheries are not shown on this list.
Please contact NOAA Fisheries for species under their jurisdiction.
1. Species listed under the Endangered Species Act are threatened or endangered; IPaC also shows species that are candidates, or proposed, for listing. See the listing status pag~ for more information.
IPaC only shows species that are regulated by USFWS (see FAQ).
2. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce.
The following species are potentially affected by activities in this location:
Mammals
NAME STATUS
Attachment 2 Agenda Report Page 270
Salt Marsh Harvest Mouse Reithrodontomys raviventris
Wherever found
No critical habitat has been designated for this species. httQs:/ /ecos.fws.gov/ecQ/SQecies/613
Birds
NAME
California Least Tern Sternula antillarum browni
Wherever found
No critical habitat has been designated for this species. httQs:/ /ecos.fws.gov/ecQ/SQecies/8104
California Ridgway"s Rail Rallus obsoletus obsoletus
Wherever found
No critical habitat has been designated for this species. httQs:/ I ecos. fws.gov / ecQISQeci es/ 4240
Western Snowy Plover Charadrius nivosus nivosus
There is final critical habitat for this species. Your location does not overlap the critical habitat.
httQs:/ I ecos. fws.gov / ecQISQeci es/8035
Reptiles
NAME
Alameda Whipsnake (=striped Racer) Masticophis lateralis euryxanthus
Wherever found
There is final critical habitat for this species. Your location does not overlap the critical habitat.
httQs:/ I ecos. fws.gov / ecQISQeci es/5524
Northwestern Pond Turtle Actinemys marmorata
Wherever found
No critical habitat has been designated for this species. httQs://ecos.fws.gov/ecQISQecies/1111
Amphibians
NAME
California Red-legged Frog Rana draytonii
Wherever found
There is final critical habitat for this species. Your location does not overlap the critical habitat.
httQs:/ /ecos. fws.gov/ecQ/SQecies/2891
Endangered
STATUS
Endangered
Endangered
Threatened
STATUS
Threatened
Proposed Threatened
STATUS
Threatened
Attachment 2 Agenda Report Page 271
California Tiger Salamander Ambystoma californiense
There is final critical habitat for this species. Your location does not overlap the critical habitat.
httP-s:/ /ecos. fws.gov/ecP-ISP-ecies/2076
Foothill Yellow-legged Frog Rana boylii
No critical habitat has been designated for this species. httP-s:/ /ecos.fws.gov/ecP-ISP-ecies/5133
Fishes
NAME
Tidewater Gaby Eucyclogobius newberryi
Wherever found
There is final critical habitat for this species. Your location does not overlap the critical habitat.
httP-s:/ / ecos. fws.gov / ecP-ISP-eci es/5 7
Insects
NAME
Monarch Butterfly Danaus plexippus
Wherever found
No critical habitat has been designated for this species. httP-s:/ I ecos.fws.gov I ecP-ISP-eci es/97 43
Crustaceans
NAME
Vernal Pool Fairy Shrimp Branchinecta lynchi
Wherever found
There is final critical habitat for this species. Your location does not overlap the critical habitat.
httP-s:/ I ecos. fws.gov / ecP-ISP-eci es/ 498
Flowering Plants
NAME
Pallid Manzanita Arctostaphylos pallida
Wherever found
No critical habitat has been designated for this species. httP-s:/ / ecos. fws.gov / ecP-/s P-ecies/8292
Presidio Clarkia Clarkia franciscana
Wherever found
No critical habitat has been designated for this species. httP-s:/ / ecos. fws.gov / ecP-IS P-ecies/3890
Threatened
Threatened
STATUS
Endangered
STATUS
Candidate
STATUS
Threatened
STATUS
Threatened
Endangered
Attachment 2 Agenda Report Page 272
Robust Spineflower Chorizanthe robusta var. robusta
Wherever found
There is final critical habitat for this species. Your location does not overlap the critical habitat.
httP-s:// ecos. fws.gov I ecP-IS P-ecies/9287
Critical habitats
Endangered
Potential effects to critical habitat(s) in this location must be analyzed along with the endangered species themselves.
There are no critical habitats at this location.
You are still required to determine if your project(s) may have effects on all above listed species.
Bald & Golden Eagles
Bald and golden eagles are protected under the Bald and Golden Eagle Protection Act1 and the Migratory Bird Treaty Act2.
Any person or organization who plans or conducts activities that may result in impacts to bald or golden eagles, or their habitats3, should follow appropriate regulations and consider implementing appropriate conservation measures, as described in the links below. Specifically, please review the "Su1212lemental Information on Migratory Birds and Eagles".
Additional information can be found using the following links:
• Eagle Management https://www.fws.gov/program/eagle-management • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/collections/avoiding-and-minimizing-incidental-take-migratory-birds • Nationwide conservation measures for birds
https://www.fws.gov/sites/default/files/documents/nationwide-standard-conservation-measures.pdf • Supplemental Information for Migratory Birds and Eagles in !Pac https://www.fws.gov/med ia/su P-P-lementa 1-i nfo rmati o n-m igrato r:y-b i rds-a n d-ba Id-and-golden-eaglesmay-occu r-P-J:Qject-action There are bald and/or golden eagles in your project area.
For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, see the PROBABILITY OF PRESENCE SUMMARY below to see when these birds are most likely to be present and breeding in your project area.