April 16, 2024

Document
Agenda packet
Meeting
April 16, 2024
Body
Pinole City Council
Pages
223
Original file
24.0 MB
Text extracted from the city's file for reading and search. Open the original on pinoleca.api.civicclerk.com. That file is the official record.

FISCAL IMPACT
Upon dissolution of the Successor Agency, all pass through payment agreements between the Agency and any taxing entities are automatically terminated, and no further property tax will be distributed to the Redevelopment Property Tax Trust Fund. Going forward, all property taxes will be distributed to the local taxing entities in their AB 8 percentage, including the City.

ATTACHMENTS
A. Resolution

Page 149 of 223 ends

RESOLUTION No. 2024-___

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PINOLE DECLARING

THAT THERE IS NO NEED FOR THE SUCCESSOR AGENCY TO THE

REDEVELOPMENT AGENCY TO FUNCTION IN THE COMMUNITY AND

REQUESTING THAT THE CONTRA COSTA COUNTY OVERSIGHT BOARD

APPROVE THE DISSOLUTION OF THE SUCCESSOR AGENCY
WHEREAS, the City Council of the City of Pinole created the Redevelopment Agency of the City of Pinole (the “Agency”) by adoption of Ordinance No. 313 on November 22, 1972; and
WHEREAS, the California Legislature dissolved all redevelopment agencies in 2012 and created successor agencies by adoption of the Redevelopment Dissolution Law (Health and Safety Code Section 34170 et seq.) (the “Dissolution Law”); and WHEREAS, pursuant to the Dissolution Law, the City Council adopted Resolution No. 2012-05 on January 17, 2012 electing to serve as the Successor Agency to the Agency (the “Successor Agency”); and
WHEREAS, pursuant to Section 34187(b) of the Dissolution Law, when all of the Successor Agency’s enforceable obligations have been repaid, all real property has been disposed of, and all outstanding litigation has been resolved, the successor agency shall, submit to the oversight board a request, with a copy of the request to the county auditor-controller, to formally dissolve the Successor Agency; and WHEREAS, this City Council desires to request that the Contra Costa County Oversight Board approve the dissolution of the Successor Agency and submit the City Council’s request to the California Department of Finance.

NOW THEREFORE BE IT RESOLVED by the City Council of the City of Pinole as follows:

Section 1. All of the recitals above are true and correct and incorporated herein.

Section 2. The City Council hereby requests that the Contra Costa County Oversight Board dissolve the Successor Agency and submit the request to the California Department of Finance in accordance with Health and Safety Code Section.

Section 3. The City Manager or his or her designee is hereby authorized to send this request to the Contra Costa County Oversight Board with a copy of the request to the county auditor controller.

Page 150 of 223 ends

Section 4. The City Manager or his or her designee is hereby authorized to execute all documents and take any other actions necessary to dissolve the Successor Agency and to meet any other requirements under this Resolution.

Section 5. This Resolution is effective on the date of its adoption.

APPROVED AND ADOPTED this 16th day of April 2024 by the following vote:

AYES: COUNCIL MEMBERS:

NOES: COUNCIL MEMBERS:

ABSENT: COUNCIL MEMBERS
ABSTAIN: COUNCIL MEMBERS:
____________________________
Heather Bell, CMC
City Clerk

Page 151 of 223 ends

CITY COUNCIL
REPORT 10.A.

DATE: APRIL 16, 2024
TO: MAYOR AND COUNCIL MEMBERS
FROM: MARKISHA GUILLORY, FINANCE DIRECTOR
SUBJECT: APPROVAL OF THE UPDATED USER AND REGULATORY FEES AND THE

MASTER FEE SCHEDULE

RECOMMENDATION
Staff recommends the City Council hold a Public Hearing and adopt the Resolution (Attachment B) updating the City’s user and regulatory fees and the updated Master Fee Schedule to be effective July 1, 2024.

BACKGROUND
Cities impose a user or regulatory fee for services related to an individual person or entity’s request or action. In accordance with industry best practice and California statute, user and regulatory fees should be set according to the estimated reasonable cost of service and should bear a fair and reasonable relationship to the payer’s burdens on, or benefits received from, the activities and/or services provided by the City.

The City’s Revenue Policy – User Fees and Charges, a component of the Financial and Investment Policies, states that the City is empowered to recapture, through fees, up to the full cost of providing specific services. Regular and consistent review of all fees is necessary to ensure that the costs associated with delivery of individual services have been appropriately identified, and that the City is fully recovering those costs.

The City conducted a comprehensive user and regulatory fee study in 2022. The results of the study led to a number of changes to existing fees as well as established several new fees.

Each fiscal year, user and regulatory fees are reviewed and set at the direction of the City Council. Through a public hearing, any new fees or fee increases are considered for adoption.

If the new fees proposed in the updated master fee schedule (Attachment A) are adopted by the City Council, staff recommends a July 1, 2024 effective date for fee changes.

REVIEW AND ANALYSIS
In order to keep pace with general cost inflation for services provided to the community, staff is recommending that most fees, as noted below, be increased by the growth in the Consumer Price Index (CPI) over the past year. The CPI for the San FranciscoOakland-Hayward region increased by 2.4% over the past twelve months, from February 2023 through February 2024.

Page 152 of 223 ends

The following sections have been updated in the attached Master Fee Schedule (Attachment A):
• Building Fees - Most fees are increased by 2.4% based on CPI, except for fees limited to amounts outlined in the California Government Code. • Planning Fees - Most fees are increased by 2.4% based on CPI, except for deposits and fees limited to amounts outlined in the California Government Code.
• Engineering and Encroachment Permit Fees – Most fees are increased by 2.4% based on CPI, except for deposits.
• Recreation Fees – The fees are increased by 2.4% based on CPI. • Police Fees – The fees remain unchanged. Staff may recommend to Council at a later time that some fees be increased.
• Police Fines and Penalties – The fees remain unchanged as they are regulated by Pinole Municipal Code.
• Development Impact Fees – The fees remain unchanged. Staff is conducting a nexus study on the development impact fees and might recommend changes based on the results of the study.
• Wastewater Utility Fees – The fees are subject to different approval thresholds and are determined by a different process. The current rates were established in 2018, based on the rate study conducted at that time. The new rate study is in progress and anticipated to be presented to the City Council in June. • Business Licenses Fees – The fees are determined by a different process.

Pursuant to Pinole Municipal Code, they are reviewed at the end of each calendar year and only adjusted upward or downward by 5% with each

Page 153 of 223 ends

cumulative 5% change in the CPI.
• Fire Prevention Fees – The fees align with those collected by the Contra Costa County Fire Protection District.

FISCAL IMPACT
Any additional revenue expected from the Proposed Master Fee Schedule is intended to offset the cost of providing existing services associated with those fee-related regulatory functions and other programs.

ATTACHMENTS
A. Master Fee Schedule effective 7-1-24
B. RESO Master Fee Schedule

Page 154 of 223 ends

Master Schedule of User and Regulatory Fees
Proposed: April 16, 2024
Effective: July 1, 2024

Page 155 of 223 ends

Fees Page
ADMINISTRATIVE FEES 1
BUSINESS LICENSE APPLICATION REVIEW FEES 3
RENTAL & BALCONY INSPECTION PROGRAM FEES 5
BUILDING FEES 6
DEVELOPMENT IMPACT FEES 12
PLANNING FEES 13
CODE ENFORCEMENT FEES 17
ENGINEERING AND ENCROACHMENT PERMIT FEES 18
FIRE PREVENTION FEES 21
POLICE FEES 40
SPECIAL EVENT AND FILM PERMIT APPLICATION REVIEW FEES 44 RECREATION AND FACILITY RENTAL FEES 45
WASTEWATER (SEWER) UTILITY FEES 51
City of Pinole
Table of Contents
Master Schedule of User and Regulatory Fees

Page 156 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - CITY CLERK ADMINISTRATIVE FEES
Fee Charge Basis Note
1 Hardcopy Records Request $0.10 per single sided page
2 Oversize documents $3 per page
3 Document Imaging $3 per sheet
4 Filing Fee - Notice of Intent to Circulate Initiative Petition $200 5 Garbage Service Exemption (Resolution No. 2005-39) $48 6 Administrative Fee for Waste Collection Lien (PMC

8.08.110(G)/Resolution No. 2008-165
$55
7 Appeal Fee for Business License Revocations, Massage Establishment /Operator Permits & Code Enforcement Actions (Resolution 2009- 122/11-19-2009)
$575 each
8 Requests Requiring Special Programming or Formatting Actual hourly rate plus cost of digital devices
[a]
Activity Description
[a] This fee applies to the creation of a new document or information not normally prepared, owned, used or retained by the City as part of the conduct of the Public's business. Fee also includes cost of any digital devices used to provide requested information. 1

Page 157 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FINANCE ADMINISTRATIVE FEES
Fee Charge Basis Note
1 Credit Card Transaction Processing Fee pass-through of vendor charge
% of amount paid by
credit card
[a]
2 Not Sufficient Funds Charge $25 each
3 Hourly Rates and Fees for Services Not Listed in this Fee Schedule a) Finance Personnel $134 per hour [b]
Activity Description
[a] Fee will only apply when credit card is used for payment of fees for development/fire-related fees, permits, plan review, etc. Fee is intended to serve as a pass-through based on vendor agreement.
[b] For services requested of City staff which have no fee listed in this Master Fee Schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the following hourly rates for staff time involved in the service or activity. 2

Page 158 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - BUSINESS LICENSES
Fee Charge Basis Note
1 Fixed Place of Business in Pinole (Includes Home Businesses & Pinole Contractors)
Per Year (includes one employee) $160
Additional Employees (2 to 19) $24 per employee
Additional Employees (over 20) $19 per employee
2 Rental Properties
Basic Fee for one Property (1 unit) $160
Each additional Unit (2-4 units) $19
Additional Units (5 or more) $10
3 Hotels and Motels
Basic Fee $160
Each Rental Unit $10
4 Bowling Alley
Basic Fee (includes 2 lanes) $160
Additional Lanes $54 each
5 Outside Licensed Contractors/Subcontractors
Annual fee for current calendar year $249
Semi-annual (6 consecutive months within the same calendar year) $137 Quarterly (3 consecutive months within the same calendar year) $82 6 Outside Personal/Professional Service $160 per year
7 Delivery Vehicles $160 per year
8 Public Amusements
Rides and Shows $134 per day
Carnival $1,364 per day
Circus
a) Base Fee $1,364 per day
b) Per Day, Per Show $272
9 Dance Hall $816 per year
10 Motion Picture Theatre $326 per year
11 Playhouse $326 per year
Activity Description
3

Page 159 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - BUSINESS LICENSES
Activity Description Fee Charge Basis Note
12 Pool Hall
Base Fee $160 per year
Per Table Over Two $80 per year
13 Advertising Vehicles
Per Vehicle $12 per day
Minimum Tax $87
14 Billboard $160 per year
15 Auctioneer
Daily Fee $134
Annual Fee $1,118
16 Pawnbroker $816 per year
17 Astrology, etc. $397 per month
18 Peddlers, solicitors $160 per year
19 Photographers
Daily Fee $27
Door-to-door solicitation for taking photographs, for enlargements, frames, etc. - per quarter
$80 per quarter
20 Fire Sale $272 per day
21 Distribution of Advertising Matter
Per Year (includes one employee) $160
Additional Employees (2 to 19) $24 per employee
Additional Employees (over 20) $19 per employee
Less than 40 weeks a year $19 per employee, per day
22 Transfer of Ownership Fee $7
23 Exemption Certificate $30
24 Penalty-Per Municipal Code 5.04.180 Sec. A (50% of license fee) 50% [a] 25 State Mandated Fee (AB 1379) (applies to All Licenses) $4 [a] Renewal must be postmarked, or hand delivered to City Hall by close of business on January 31 of calendar year for which business license applies to avoid penalty.
4

Page 160 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - RENTAL & BALCONY INSPECTION PROGRAM FEES Fee Note
1 Rental Inspection Program Fee
a) Base Fee (Covers Initial Inspection and First Reinspection) i) Single Family Unit, Duplex Unit, or Triplex Unit $387 ii) Multi-Family Unit Including Hotel/Motel Unit $242
b) Reinspection Fee (only applicable if required)
i) 2nd Reinspection 20% of initial fee
ii) 3rd Reinspection 30% of initial fee
iii) 4th Reinspection 40% of initial fee
2 Balcony Inpection Program Fee $194
Activity Description
5

Page 161 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - BUILDING FEES
Fee Note
1 HVAC Change-Out - Residential $194
2 Water Heater Change-Out - Residential $145
3 Residential Re-Roof
a) Up to 2,000 SF (Roof Area) $290
b) Each Add'l 1,000 SF or fraction thereof $97
4 Service Panel Upgrade - Residential $194
5 Battery Backup Storage - Residential $194
6 Electric Vehicle Charger - Residential $194
7 Generator - Residential $194
8 Residential Solar Photovoltaic System - Solar Permit
a) 15kW or less $225 [a]
b) Above 15kW $450 base fee, plus $15 per kW for each
kW above 15kW
[a]
9 Commercial Solar Photovoltaic System - Solar Permit
a) 50kW or less $1,000 [a]
b) 50kW – 250kW $1,000 base fee, plus $7 per kW for each kW above 50kW up to 250kW
[a]
c) Above 250kW $2,400 base fee, plus $5 per kW for each kW above 250 kW
[a]
10 Solar Thermal - Residential $315 [a]
11 Ground-Mount Solar - Residential $360 [a]
12 Swimming Pool / Spa Equipment Change-out Only $194
13 Swimming Pool Replaster - Residential $194
14 Residential Voluntary Seismic Retrofit – Push Piers Only (10 and fewer) $290 15 Retaining Wall
a) Wall Under 4' in height $387
b) Wall Over 4' in height
i) Up to 100 LF $774
ii) Each Additional 100 LF $48
16 CMU Wall
a) Wall Under 6' in height $387
b) Wall Over 6' in height
i) Up to 100 LF $774
ii) Each Additional 100 LF $48
17 Exterior Doors / Windows / Sliding Glass Doors - Retrofit / Repair a) Up to 5 $194
b) Over 5
18 Fences Requiring a Building Permit $194
19 Plumbing Permit $194
20 Mechanical Permit $194
21 Electrical Permit $194
22 Rooftop Solar Panel Removal and Replacement $194
[a] Total fees shall not exceed amounts outlined in California Government Code 66015(a)(1).

A. Fees for Commonly Requested and Minor Miscellaneous Building Permit Types. Fees shown in this section (Section A.) include all applicable inspection, and plan review fees. Additional permit processing fees apply. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies.

Fee Description
6

Page 162 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - BUILDING FEES
Total Valuation Permit Fee
$1 to $2,000 $194
$2,001 to $25,000 $290 for the first $2,000 plus $21 for each add'l $1,000 or fraction thereof, to and including $1,000
$25,001 to $50,000 $774 for the first $25,000 plus $27 for each add'l $1,000 or fraction thereof, to and including $1,000
$50,001 to $100,000 $1,452 for the first $50,000 plus $17 for each add'l $1,000 or fraction thereof, to and including $100,000
$100,001 to $500,000 $2,322 for the first $100,000 plus $13 for each add'l $1,000 or fraction thereof, to and including $500,000
$500,001 to $1,000,000 $7,354 for the first $500,000 plus $7 for each add'l $1,000 or fraction thereof, to and including $1,000,000
$1,000,001 and up $10,838 for the first $1,000,000 plus $5 for each additional $1,000 or fraction thereof over $1,000,000
For permits for new construction, additions, tenant improvements or residential remodels requiring plumbing, electric, or mechanical review, the following percentages shall be added to the base permit fee Mechanical inspection fee = Base permit fee x .10
Determination of Valuation for Fee-Setting Purposes
● Building Valuation shall be based on the higher of 1) the applicant’s estimated valuation or 2) the most current Building Valuation as printed and published by the International Code Council and adjusted using the most current City Cost Index printed and published by R. S. Means Building Construction Cost Data. CRC, R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor.

The final building permit valuation shall be set at an amount that allows the City to recover its costs of applicant plan check, permit and inspection activities.

Note: For construction projects with permit fees calculated using Section B, additional fees apply for permit issuance. Additional fees may apply for services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California). Additional fees apply for plan review, when applicable.

B. Base Permit Fee for New Buildings, Additions, Tenant Improvements, Residential Remodels, and Mechanical, Electrical, and/or Plumbing Permits Not Identified Elsewhere in This Fee Schedule
Plumbing inspection fee = Base permit fee x .10
Electrical inspection fee = Base permit fee x .10
7

Page 163 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note
1 Building Plan Check Fees - Building
a) Plan Review Fee, if applicable 75% % of permit fee [a] b) Expedited Plan Check - At Application Submittal (when applicable) 1.5x standard plan check fee
c) Over the Counter Plan Review Fee $194 Per Hour [b];[c] d) Revision Application Fee (per hour) (1-hour minimum) $194 Per Hour e) Tract Home / Master Plan Construction (Production Units) 20% of standard plan check fee
[d]
f) Alternate Materials and Materials Review (per hour) $194 Per Hour g) Excess Plan Review Fee (4th and subsequent) (per hour) $194 Per Hour h) Revisions (per hour) $194 Per Hour
2 Building Plan Check Fees - Planning
(Fees Only Applied to Projects Requiring Review)
a) Zoning Clearance Verification $116
b) Planning Plan Check
i) Alterations/Additions - Residential $289
ii) New Construction - Single Family Residential $520
iii) New Construction - 2-4 Residential Units $982
iv) New Construction - 5+ Residential Units $2,543
v) New Construction - Non-Residential $982
vi) Alterations/Additions - Non-Residential $520
3 Building Plan Check Fees - Public Works Engineering
(Fees Only Applied to Projects Requiring Review)
a) Swimming Pool $215
b) Block Wall $108
c) Fence $108
d) Sign $108
e) Alterations/Additions - Residential $161
f) New Construction - Single Family Residential $430
g) New Construction - 2-4 Residential Units $645
h) New Construction - 5+ Residential Units $1,290
i) New Construction - Non-Residential $860
j) Alterations/Additions - Non-Residential $215
k) Trash Capture, SWPPP, and NPDES Review Fees See Eng. Fee Schedule l) Permits / Plan checks not listed above See footnote [e] C. Building Plan Review Fees
Activity Description
8

Page 164 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note
C. Building Plan Review Fees
Activity Description
[a] Includes up to three plan checks. The City will bill hourly for additional plan review required. [b] For permits requiring only over the counter plan review, e.g. non-engineered plans.

When applicable, plan check fees shall be paid at the time of application for a building permit.

The plan checking fee is in addition to the building permit fee. Plan check fee applies to base building permit fee and mechanical, electrical, and plumbing inspection fees, when applicable.
[d] For identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time.
[e] Engineer/technician to determine hours and applicable fee at time of application. [c] Category added to fee schedule subsequent to initial adoption, allows for reduced plan check fee for over the counter / in-house plan check. 9

Page 165 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - BUILDING FEES
Fee Note
1 Permit Processing Fee $81
2 Fire Permit Processing Fee $81
3 Outside Contractor Business License Processing Fee $65 4 Business License Inspection Fee
a) Residential Home Occupation $65
b) Non-Residential $145
5 General Plan Maintenance Fee (% of base building permit fee) 10% 6 Technology Fee (% of base building plan review and base building permit fee) 10% 7 Strong Motion Instrumentation (SMI) Fee Calculation
a) Category 1 Construction (1 to 3 Story Residential) Greater of $0.50 or valuation x .00013
[a]
b) Category 2 Construction (Over 3 story Residential and all Commercial) Greater of $0.50 or valuation x .00028
[b]
8 Building Standards (SB 1473) Fee Calculation (Valuation) a) $1 - $25,000 $1
b) $25,001 - $50,000 $2
c) $50,001 - $75,000 $3
d) $75,001 - $100,000 $4
e) Each Add'l $25,000 or fraction thereof Add $1
9 Temporary Certificate of Occupancy (per 30 Days) $291 10 Permit Extension $194
11 Permit Reactivation Fee
a) Reactivation Fee if All Inspections Have Been Performed and Approved Up to But Not Including Final Inspection
$194 [c]
b) Reactivation Fee - All Other Scenarios
i) Permit Expired Up to One Year 50% of Original Base
Building Permit Fee
ii) Permit Expired More than One Year 100% of Original Base Building Permit Fee
12 Permit Reissuance Fee $97 [d]
13 Damaged Building Survey (Fire, Flood, Vehicle Damage, Etc.) $290 14 AB 838 Violation Fees
a) Investigation resulting in Violations under AB 838 (per hour) (1-hour minimum) $194 b) Inspection Report Production for Violations under AB 838 (per hour) (1-hour minimum) $194 D. Other Fees
Activity Description
10

Page 166 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - BUILDING FEES
Fee Note
D. Other Fees
Activity Description
Other Fees
15 Phased Inspection Fee (per inspection) $97
16 After Hours Inspection (per hour) (4-hour minimum) $232 17 Re-inspection Fee (2nd Time or More) (each) $97 [e]
18 Missed Inspection Fee $97
19 Duplicate Copy of Permit $65
20 Duplicate Copy of Certificate of Occupancy $32
21 Construction and Demolition Waste Management Review Fee $97 22 Fees for Services Not Listed in this Fee Schedule (per 1/2 hour) $97 Violation Fees
23 Investigation Fee For Work Done Without Permits
(In addition to applicable permit fees)
equal to
permit fee
Refunds
24 Refunds
a) Fees Erroneously Paid or Collected by the City 100% refund b) Refund of Plan Review Fees - Prior to Plan Review Commencing up to 80% refund c) Refund of Permit Fees - Prior to Inspection Commencing up to 80% refund d) 180 Days After Payment of Fees no refund
25 Hardcopy Records Request $0.10
per single side page
26 Oversize documents $3
per page
[c] For reactivation of expired building permits that are no longer valid. [d] Example; change of contractor.
[e] Reinspection fee applies after the first re-inspection. [a] Category 1 Construction includes residential buildings 1 to 3 stories in height, excluding hotels and motels. Single family houses, duplexes and quadruplexes are considered Category 1. Condominiums and apartment buildings which are 3 stories or less in height are considered Category 1. [b] Category 2 Construction includes all buildings not considered Category 1 (i.e. residential buildings over 3 stories, all office buildings, warehouses, factories and other manufacturing or processing facilities, restaurants, and other non-residential buildings). 11

Page 167 of 223 ends

City of Pinole
MASTER FEE SCHEDULE - DEVELOPMENT IMPACT FEES1,2
Single Family Multi-Family Office Commercial Industrial Institutional 1 Police $1,321.29 $1,000.98 $500.49 $160.16 $400.40 $40.04 2 Fire Protection $1,688.49 $1,279.16 $639.58 $204.67 $511.66 $51.16 3 Public Facilities &
Equipment
$2,278.48 $1,726.13 $863.06 $276.18 $690.45 $69.05
4 Wastewater $5,684.45 $4,263.05 $2,640.40 $2,640.40 $2,160.85 $1,439.80 5 Transportation $477.05 $338.71 $639.25 $1,598.13 $419.81 $1,211.72 6 Drainage $1,270.54 $76.23 $186.67 $186.67 $369.46 $437.52 7 Parks and Recreation $9,215.85 $6,981.71 n/a n/a n/a n/a 8 Subtotal $21,936.16 $15,665.97 $5,469.46 $5,066.21 $4,552.62 $3,249.29 9 Administration (3%) $658.08 $469.98 $164.08 $151.99 $136.58 $97.48 10 Total $22,594.24 $16,135.95 $5,633.54 $5,218.20 $4,689.20 $3,346.77 1 Adopted purusant to Resolutions 2008-92, 2018-29 and 2022-55; fees last adjusted for the percentage change in the Engineering News-Record Construction Cost Index-San Francisco Bay Area for the preceding twelve-month period calculated from April 1st to March 31st. 2 Additional impact Fees are required from other agencies, including the West Contra Costa Transportation Advisory Committee (WCCTAC) and the the West Contra Costa Unified School District (WCCUSD). The WCCTAC's West County Subregional Transportation Mitigation Program (STMP) fees are collected by the City of Pinole and transmitted to the WCCTAC. The WCCUSD collects school facilities development fees for new residential, commercial and industrial construction resulting in new assessable area. The City requires proof of WCCUSD review, and when applicable, a certificate of payment issued by the District to confirm that required District development fees have been paid.

Activity Description
Fee per Dwelling Unit Fee per 1,000 Building Square Feet 12

Page 168 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - PLANNING FEES
Fee Note
Design Review
1 Administrative Design Review: Single family residential additions; additions of less than 500 sf for multifamily and nonresidential
$780
2 Comprehensive Design Review – Small
New single family residence; new multifamily building with 2 to 4 units; multifamily and nonresidential additions 500 to 5,000sf
$3,978
3 Comprehensive Design Review – Medium
New multifamily building with 5 to 10 units; multifamily and nonresidential additions 5,001 to 10,000sf
$10,689
4 Comprehensive Design Review – Large
New multifamily building of 10 or more units; new nonresidential buildings; multifamily and nonresidential additions greater than 10,000sf
$20,000 Deposit;
$14,000 Minimum Fee
5 Sign Permit: New Sign/Approved Program, replace old sign as previously approved, etc. $462 6 Creative Sign Program: Encourage signs of unique design $806 7 Sign Program: 5 or more signs or greater than 200 sq. ft. of total aggregate sign area or building with 3 or more tenants.
$2,312
Use Permits
8 Similar Use Determination $349
9 Administrative Use Permits (AUP): Outdoor Dining $941 10 Temporary Use Permits (TUP) – Small.

Special one-day events, such as grand openings
Outdoor sales and display.

Seasonal sales (Christmas tree sales, pumpkin sales)
$376 [a]
11 Temporary Use Permits (TUP) – Large.

Construction yards and storage sheds
Expositions, concerts, clinics, amusement rides, and flea markets. $833 [a]
12 Conditional Use Permits (CUP) $5,575
13 Home Occupation Permit $151
14 Condo Conversion Permit $7,500 Deposit;
$5,000 Minimum Fee
15 Tree Removal Permit $231
16 Use Permit Amendments $2,774
17 Use Permit - Combined with Other Permits 100% of highest applicable permit fee, plus 50% of all other
applicable permit fees
Activity Description
13

Page 169 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - PLANNING FEES
Activity Description Fee Note
Variances
18 Minor Deviation $710
19 Single Family Variance $1,774
20 All Other Variance Requests $5,086
Policy / Plan Amendments
21 Prezoning / Annexation $20,000 Deposit;
$14,000 Minimum Fee
22 Rezoning / Zoning Code Amendment (Includes Map and Text) $10,171 23 Minor Development Plan Amendment $462
24 General Plan Amendment $10,000 Deposit;
$7,000 Minimum Fee
25 Specific Plan Amendment $10,000 Deposit;
$7,000 Minimum Fee
Subdivision / Mapping
26 Subdivision / Tentative Map
a) Minor Subdivision / Parcel Map (4 Lots or Less) $5,000 Deposit; $3,500 Minimum Fee
b) Major Subdivision / Tract Map (5 or More Lots) $7,500 Deposit; $5,000 Minimum Fee
27 Lot Line Adjustment $2,000 Deposit;
$1,400 Minimum Fee
28 Lot Merger $2,000 Deposit;
$1,400 Minimum Fee
29 Easement / Street Vacation / Existing Utility Review $2,000 Deposit; $1,400 Minimum Fee
30 Final Map
a) Parcel Map $5,000 Deposit;
$3,500 Minimum Fee
b) Tract Map $7,500 Deposit;
$5,000 Minimum Fee
Environmental Review
31 Categorical Exemption $269
32 Initial Study $3,500 or Consultant Cost + 15%
33 Negative Declaration $5,000 Deposit;
$3,500 Minimum Fee
34 Mitigated Negative Declaration $10,000 Deposit;
$7,000 Minimum Fee
35 Environmental Impact Report Consultant Cost + 15%; Deposit TBD
14

Page 170 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - PLANNING FEES
Activity Description Fee Note
Agreements
36 Development Agreement $10,000 Deposit;
$7,000 Minimum Fee
37 Affordable Housing Agreement $10,000 Deposit;
$7,000 Minimum Fee
38 Review of CC&R's $2,500 Deposit;
$1,750 Minimum Fee
Other Development Services
39 Extensions 1/2 Original Fee
40 Appeals of Department, Administrative and Planning Commission Actions (Per Appeal) $500 + $2,500 Deposit [b] 41 Zoning Administrator Hearing (Each Required Hearing) $521 42 Planning Commission / City Council Hearing (Each Required Hearing) $694 43 Records Research $100 per half hour after first hour 44 Address Assignment $330
Public Noticing
45 Project Notification Sign $269 per sign
(as needed)
46 Public Noticing (Administrative) $484
47 Public Noticing (Public Hearing Required) $753
48 Public Noticing (Deposit-Based Project) Deposit
Small Cell Wireless
49 Small Cell: Right of Way Pole Usage Fee $270 per pole annually [c] 50 Small Cell Wireless Attachment Fee $500 for first five + $100 for each additional
[c]
51 Small Cell Wireless New Pole $1,000 [c]
Affordable Housing Requests
52 Equity-Share Payoff Demand $347
53 Reconveyance $347
54 Density Bonus Application $462
Redevelopment (Successor Agency)
55 Loan Extension Application Fee (Commercial/Residential) $349 15

Page 171 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - PLANNING FEES
Activity Description Fee Note
Technology Enhancement Fee
56 Technology Fee (% of plan review and permit fee) 10% Violation Fees
57 Penalty for Work Without Planning Approval equal to
permit fee
Hourly Rates and Fees for Services Not Listed in this Fee Schedule 58 Rates for Services Not Listed Above
a) Planning Personnel (per hour) $231
b) Contract Planning, Peer Review, Architecture Review, Etc. Pass through of Actual Cost + 15% c) Specialized Attorney Services Pass through of Actual Cost 59 Hardcopy Records Request $0.10
per single side page
60 Oversize documents $3
per page
[a] Temporary use permit fee may be reduced to $0 (no charge) for non-profit entities. [b] Planning Commission Appeal requests initiated by the City Council members shall be accompanied by a $250 rather than $500 appellant fee.

The $250 may be refundable if the appeal initiated by a majority of the City Council members that hear the appeal request.

Applicants for full cost (deposit-based) submittals shall pay for all City staff and contract service provider time and materials required to process the application. A full cost reimbursement agreement shall be included with the project application submittal package. Projects outside the scope of this fee schedule will be subject to a full cost reimbursement agreement to be approved by the City Manager and/or City Council. This reimbursement agreement will include the identification of a work program and will include cost estimates for both City staff time and consultant services based on a defined scope of work.

Initial deposits will be collected and held by the City in a deposit account at the time the application is submitted. Project billing amounts will be drawn from the deposit account. If the deposit is reduced to below 20% of the initial deposit amount, the applicant will be notified and required to supplement the deposit account with an additional amount.

When more than one full cost application is submitted, the sum total of the initial full cost deposit amount may be reduced by up to 20% at the discretion of the Planning Director.
[c] Total fees shall not exceed amounts outlined in California Government Code 66015(a)(1).

Funds expended for staff time shall not be dependent upon the City’s approval or disapproval of the application request. Any deposit amounts remaining after final project close out will be returned to applicant (less bond amounts held by the City).

As may be required by the Planning Department or Public Works Department for project evaluation or environmental review, all payment for attorney and consultant work shall be the responsibility of the applicant.

Overview of Fee Structure
Fees may be either fixed fees, or Full Cost Recovery with Minimum Amount Due. When a fee is Full Cost Recovery with Minimum Amount Due, the minimum amount charged shall be the Minimum Fee. The City reserves the right to collect amounts in excess of the minimum fee when City costs or other review costs (e.g. consultant, County, attorney, etc.) exceed this amount.

Use of Full Cost Recovery with Minimum Amount Due
For fees collected using Full Cost Recovery with Minimum Amount Due, the City will provide an accounting of internal costs and other related costs (e.g. consultant, County, attorney, etc.), to support any amounts billed in excess of the minimum amount due.

Full Cost Deposits and Deposit Replenishment Policy
16

Page 172 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - CODE ENFORCEMENT FEES
Fee Note
1 Courtesy Inspection
a) First Inspection No Charge
b) Second Inspection to Verify Violation Corrected No Charge c) Each Additional Inspection $83
2 Re-Inspection Fee $83
3 Abatement Warrant $331
4 Serving Notice $41
5 Lien Approval Fee $161
6 Special Assessment Approval Fee $161
7 Lien Release Fee $161
8 Tobacco Retailer License
a) New $225
b) Renewal $225
c) Late Renewal Same as Business Lic.
d) Suspension Appeal $225
e) Citation Appeal e
)
9 Request for Extension of Time C
a) First Request No Charge
b) Second and Subsequent Requests (each) $38
10 Oversized and Non-Motorized Vehicle Visitor Parking Permit bill hourly; 1-hour min. [a] 11 Appeals
a) Notice and Order Appeal $618
b) Notice of Violations Appeal $618
c) Administrative Citation Appeal $27
12 Technology Fee (% of Fee) 10%
13 Late Payment Penalty 5% of unpaid amount
14 Rates for Services Not Listed Above
a) Code Enforcement Personnel (per hour) $166
b) Specialized Services Including, but not limited to, Attorney and Abatement Services Pass through of Actual Cost 15 Hardcopy Records Request $0.10
per single side page
16 Oversize documents $3
per page
[a] Pinole Municipal Code Section 8.24.035.C.3
Activity Description
17

Page 173 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - ENGINEERING AND ENCROACHMENT PERMIT FEES Fee Note
Encroachment Permit Fees
1 Permit Issuance Fee (applies to all encroachment permits) $161 2 Permit Renewal Fee / Time Extension $108
3 Permit Fee
a) Sewer Lateral
i) Base Permit Fee $215
ii) Video Inspection, If Required $108
b) Concrete Flat Work or Under Sidewalk Drain
i) Up to 500 SF $430
ii) Add for Each Additional 500 SF $108
c) Street Cut or Drainage Modifications
i) < 10 CY excavated $645
ii) Add for Each Additional 10 CY $323
d) Utility Pole - Set, Relocate or Remove $430
e) Utilities Structure Inspection $323
f) Storage in Public Right-of-Way for Moving Pods $108
g) Landscape Maintenance $108
h) Temporary Staging for Items Not Listed Above $108
i) Block Party Permit Permit Issuance Fee
j) Vendor Permit Permit Issuance Fee
k) Traffic Control Only $215
l) Major Project [a]
i) First Day $645
ii) Each Additional Day $323
m) Projects Greater than Two Weeks in Duration $4,000 Deposit n) Permit Types Not Listed $215
4 Other Applicable Fees, if Required
a) Traffic Control Plan Review $323
b) Revocable Encroachment Permit / Hold Harmless Agreement $538 5 Permit Bond / Deposit
a) One-year maintenance bond for street cuts equal to the value of the work or as determined by Public Works Director / City Engineer.

Varies - See description
b) Bond for concrete work, including curb, gutter and sidewalk drains. Deposit is equal to the value of the work or as determined by Public Works Director / City Engineer. Deposit is returned upon passing final inspection for concrete work.

Varies - See description
c) One-year maintenance bond for storm drainage modifications equal to the value of the work or as determined by Public Works Director / City Engineer.

Varies - See description
Activity Description
18

Page 174 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - ENGINEERING AND ENCROACHMENT PERMIT FEES Activity Description Fee Note
Grading Fees
6 Grading Plan Review
a) 0 - 50 CY
b) 50 to 10,000 CY $968
c) 10,001 to 100,000 CY $1,398
d) Add for Each 10,000 CY above 100,000 $323
7 Grading Permit Issuance $215
8 Grading Permit Bond (per CY) $5
9 Grading Inspection
a) 0 - 50 CY
b) 50 to 10,000 CY $1,290 [b]
c) 10,001 to 100,000 CY $2,580 [c]
d) Add for Each 10,000 CY above 100,000 $215
Erosion and Clean Water (Including Full Trash Capture System) 10 Stormwater Pollution Prevention Construction Permit: C.6 Inspections (Permits for Construction Projects that Require Stormwater Pollution Prevention, Includes Monthly Inspection)
a) Less than 1-Acre Hillside Site, Requiring an Erosion and Sediment Control Plan $645 [d] b) More than 1-Acre Requiring an Erosion and Sediment Control Plan $1,290 [d] c) Re-Inspections (Due to Fail in Maintaining BMP's) $215 [d] 11 C.3 Fees for Projects Which Create or Replace More than 10,000 SF of Impervious Surface a) Stormwater Control Plan Review / Approval $968 [d]
b) Operations and Maintenance Plan Review / Approval $538 [d] c) Annual Inspection Fee
i) Up to 25,000 SF $860 [d]
ii) Greater than 25,000 SF $1,720 [d]
Oversize Load Permit Fee
12 Oversize Load Permit Fee
a) Per Day $17
b) Annual $97
Temporary Barricade Delivery / Pickup
13 Temporary Barricade Delivery / Pickup
a) Temporary Barricade Delivery / Pickup $215
b) Refundable Security Deposit TBD by Public Works Director / City Engineer
19

Page 175 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - ENGINEERING AND ENCROACHMENT PERMIT FEES Activity Description Fee Note
Other
14 After Hours Inspection (per hour) (4-hour minimum) $258 15 Re-inspection Fee / Missed Inspection / Excessive Inspection Fee (2nd Time or More) $215 [e] 16 Excessive Resubmittals $215 [e]
17 Revisions $215
Expedited Permit / Plan Review Fees
18 Expedited Permit / Plan Review Fees 1.5x standard fee Technology Enhancement Fee
19 Technology Fee (% of plan review and permit fee) 10% Violation Fees
20 Investigation Fee For Work Done Without Permits
(In addition to applicable permit fees)
equal to
permit fee
Hourly Rates and Fees for Services Not Listed in this Fee Schedule 21 In-House Public Works Personnel $215
22 Contract Service Providers Pass through of Actual Cost + 15%
23 Attorney Services Pass through of Actual Cost
[b] Fee includes up to 8 inspections. Any additional inspections will be charged at hourly rate. [c] Fee includes up to 16 inspections. Any additional inspections will be charged at hourly rate. [a] Major Projects include ground disturbing activities, projects lasting longer than three days, or projects that require permanent traffic control for the duration of the project (e.g. excavation, trenching, boring, etc.). [e] All fees include up to three plan checks and inspection and re-inspection. The City will bill hourly for additional plan review and inspections required.
[d] If a contract service provider is used for these reviews, the City may pass through of actual cost, plus 15% to the applicant, rather than fixed fee amounts listed.
20

Page 176 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Fee * Note

OPERATIONAL PERMITS
1 Aerosol Products
Permit to store, manufacture, or handle an aggregate quantity of Level 2 or Level 3 aerosol products in excess of 500 pounds net weight.
$316
2 Amusement Buildings
Permit to operate a special amusement building.
$316
3 Aviation Facilities
Permit to use Group-H or Group-S occupancies for aircraft servicing or the repair of aircraft, including aircraft fuel-servicing vehicles.

Does not include permits for hot works, flammable/combustible spraying operations, or hazardous materials.
$632
4 Carbon Dioxide Systems used in Beverage Dispensing Applications Permit to operate a carbon dioxide system used for beverage dispensing having more than 100 pounds of carbon dioxide.
$316
5 Carnivals, Fairs, Festivals, and Exhibitions
a) Permit to operate a carnival, fair, festival, or exhibition. Inspections conducted during normal work hours – (1.25 hours).
$395
b) Additional inspection time during normal business hours, per ½ hour. $158 c) Additional inspection time after normal business hours, per hour. $316 d) Overtime and Weekend Inspections: Two hour minimum fee. $632 6 Cellulous Nitrate Film
Permit to store, use, or handle cellulose nitrate film in a Group A occupancy. $474
7 Combustible Dust Production
Permit to operate facility with operations producing combustible dust (e.g., grain elevator, flower starch milk, fee mill, or a plan pulverizing aluminum, coal, cocoa, magnesium, spices or sugar, etc.).
a) Up to 2500 sq. ft. $316
b) More than 2500 sq. ft. $632
8 Combustible Fibers
Permit to store or handle combustible fibers in excess of 100 cu. ft. $632
9 Compressed Gas
Permit to store, use, or handle compressed gases at normal temperature and pressure in excess of the amounts listed in Table 105.6.9 of the CFC.
$395
10 Covered and Open Mall Buildings
Permit for the placement of retail fixtures and displays, concession equipment, displays of highly combustible goods, liquid or gas-fired equipment, and the use of open flame or flame producing equipment in the mall.
$395
11 Cryogenic Fluids
Permit to produce, store, transport on site, use, handle, or dispense cryogenic fluids in excess of the amounts listed in Table 105.6.11 of the CFC.
$395
Activity Description
21

Page 177 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
12 Cutting and Welding
Permit to conduct cutting or welding operations.
$395
13 Dry Cleaning
Permit to engage in dry cleaning operations or to change to a more hazardous cleaning solvent in existing dry cleaning equipment.
$395
14 Explosives
Permit to manufacture, store, handle, sell, or use any quantity of explosives or explosive materials. See Pyrotechnic Special Effects Material section. a) Up to 100 lbs. $632
b) More than 100 lbs. $948
15 Gunpowder Sales
Permit for the resale of gunpowder (does not include inspection fees required in FC – 15b.3). a) Up to 100 lbs. $2
b) More than 100 lbs. $10
c) Inspection time, per ½ hour. $158
16 Fire Hydrants and Valves
Permit to use or operate fire hydrants or valves intended for fire suppression.

See Engineering Fee Schedule for temporary construction water supplies. $316
17 Flammable and Combustible Liquids
a) Permit to use or operate a pipeline for the transportation within facilities of flammable or combustible liquids.
$395
b) Permit to store, handle, or use Class I liquids. In excess of 5 gallons – Inside. $395 c) In excess of 10 gallons – Outside. $632
d) Permit to store, handle, or use Class II or Class III liquids. In excess of 25 gallons – Inside. $395 e) In excess of 60 gallons – Outside. $395
f) Permit to store, handle, or use class IIIB liquids in tanks or portable tanks for fueling motor vehicles at motor fuel dispensing facilities or where connected to fuel-burning equipment. $395
g) Permit to remove Class I or Class II liquids from an underground storage tank used for fueling motor vehicles by any means other than the approved, stationary on-site pumps normally used for dispensing purposes.
$395
h) Permit to place temporarily out of service (for more than 90 days) an underground, protected above-ground, or above-ground flammable or combustible liquid tank. $948
i) Permit to change the type of contents stored in a flammable or combustible liquid tank to a material that poses a greater hazard than that for which the tank was designed and constructed.
$395
j) Permit to manufacture, process, blend, or refine flammable or combustible liquids. $632 18 Floor Finishing
Permit to use Class I or Class II liquids for the refinishing of floorings in excess of 350 sq. ft. $395
19 Fruit and Crop Ripening
Permit to operate a fruit or crop ripening facility or conduct a fruit-ripening process using ethylene gas.
$316
22

Page 178 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
20 Fumigation and Insecticidal Fogging
Permit to operate a business of fumigation or insecticidal fogging and to maintain a room, vault, or chamber in which a toxic or flammable fumigant is used.

N/C
21 Hazardous Materials
Permit to store, transport on site, dispense, use, or handle hazardous materials in excess of the amounts listed in Table 105.6.21 of the CFC.
a) 1-5 products. $316
b) 5-10 products. $948
c) 11 or more products. $1,580
22 HPM Facilities
Permit to store, handle, or use hazardous production materials. $1,580
High-Piled Storage
23 Permit to use a building or portion thereof for high-pile storage in excess of 500 square feet. $632 24 Up to 5,000 sq. ft. More than 5,000 sq. ft. $948
25 Hot Work
Permit to conduct hot work.
$158
26 Industrial Oven
Permit to operate an industrial oven.
$632
27 Lumber Yards and Woodworking Plants
Permit for the storage or processing of lumber exceeding 100,000 board feet. $632
28 Liquid- or Gas-Fueled Vehicles or Equipment in Assembly Buildings Permit to operate, display, or demonstrate liquid- or gas-fueled equipment in assembly buildings.
$316
29 LPG
a) Permit to dispense, store, and use LPG. $395
b) Permit to operate a plant/facility. $632
c) Permit to exchange cylinders only – no refilling. $316 30 Magnesium
Permit to melt, cast, heat, cast, or grind more than 10 lbs. $474
31 Miscellaneous Combustible Storage
Permit to store in any building or upon any premises in excess of 2,500 cu. ft. gross volume of combustible empty packing cases, boxes, barrels or similar containers, rubber tires, rubber, cork, wood or plastic pallets, or similar combustible materials. $632
Motor Fuel-Dispensing Facilities
32 Permit to operate automotive, marine, and fleet motor fuel-dispensing facilities. $632 33 Permit to dispense liquid fuels from tank vehicles into the fuel tanks of motor vehicles, marine craft, and other special equipment at approved locations. Also includes the limited or temporary fueling operations for special events (e.g., the fueling of watercraft from shore, piers, floats, or barges).
$316
23

Page 179 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
34 Open Flames and Torches
Permit to remove paint with a torch, or to use a torch or open flame device in a wildfire risk area.
$316
35 Open Flames and Candles
Permit to use open flames or candles in connection with restaurants, public assemblies, or drinking establishments.
$316
36 Organic Coatings
Permit to manufacture any organic coating in excess of 1 gallon in one day. $316
37 Public Assemblies
Permit to operate place of assembly.
a) Occupancy load 50-100 $395
b) Occupancy load 101-200 $632
c) Occupancy load 201-299 $632
d) Occupancy load 300 + $948
38 Pyrotechnic Special Effects Material
Permit to use or handle fireworks or pyrotechnics.
a) Inspections during normal work hours – (2 hours). $632 b) Additional inspection time during normal business hours, per ½ hour $158 c) Additional inspection time after normal business hours, per hour $316 d) Overtime and weekend inspections: Two-hour minimum fee. $632 39 Permit to use or handle fireworks or pyrotechnics, including fireworks aerial displays. a) Inspections during normal work hours – (2.5 hours). $790 b) Additional inspection time during normal business hours, per ½ hour. $158 c) Additional inspection time after normal business hours, per hour $316 d) Overtime and weekend inspections: Three hour minimum fee. $948 40 Pyroxylin Plastics
Permit to store or handle more than of 25 lbs. of cellulose nitrate (pyroxylin) plastics, or to assemble or manufacture articles involving pyroxylin plastics. $316
41 Refrigeration Equipment
Permit to operate a mechanical refrigeration unit or system. $474
42 Repair Garages
Permit to operate an engine or motor vehicle repair garage, including automotive, marine and similar fueled apparatus.
a) 1 – 4 repair bays $395
b) 5 – 8 repair bays $474
c) More than 8 repair bays $632
43 Rooftop Heliport
Permit to operate a rooftop heliport.
$316
24

Page 180 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
44 Spraying or Dipping
Permit to conduct spraying or dipping operations utilizing flammable or combustible liquids or the application of combustible powder.
$395
45 Storage of Scrap Tires and Tire Byproducts
Permit to establish, conduct, or maintain storage of scrap tires and tire byproducts in excess of 2,500 cu. ft. of total volume. See Tire Storage section $632
46 Temporary Membrane Structures and Tents
Permit to operate an air-supported temporary membrane structure, including tents and canopies, having an area in excess of 400 sq. ft. (inspections during normal work hours only). a) 401 sq. ft. to 699 sq. ft. $158
b) 700 sq. ft. to 5,000 sq. ft. $316
c) More than 5,000 sq. ft. $474
d) Additional inspection time during normal business hours, per ½ hour. $158 e) Additional inspection time after normal business hours, per hour. $316 f) Overtime and weekend inspections: Two-hour minimum fee. $632 g) Permit to extend the use of a tent, canopy, or air-supported structure for an additional 180 days. (1 extension per structure)
$316
47 Tire Rebuilding Plant
Permit to operate and maintain a tire rebuilding plant. $632
48 Waste Handling Facility
Permit to operate a wrecking yard, junkyard, or waste handling facility. $632
49 Wood Products
Permit to store chips, hogged material, lumber, or plywood in excess of 200 cu. ft. $632
50 Asbestos Removal
Permit to conduct asbestos removal operations.
$316
51 Automobile Wrecking or Dismantling Yard
Permit to operate an automobile wrecking or dismantling yard. $632
52 Battery Systems
Permit to operate stationary lead-acid battery systems having a liquid capacity of more than 50 gallons.
$316
53 Christmas Tree Sales
Permit to operate a Christmas Tree lot.
$632
54 Emergency Responder Radio Coverage
Permit to operate a facility with emergency responder radio coverage systems. $158
55 Model Rockets
a) Permit to sell model rocket motors or launch model rockets in excess of three launches per event. Permits are per site and are effective as long as site conditions remain unchanged. $316
b) Additional site inspection time, per half hour. $158 25

Page 181 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
56 Tire Storage
Permit to store tires in excess of 1,000 cu. ft. inside buildings. $395
57 Oil Extraction Process
Permit to extract oil from organic material by a process that uses a volatile solvent or liquid carbon dioxide.
$316
58 Indoor Growing Operation
Permit to conduct an indoor growing operation, except agricultural greenhouses in an agricultural zone.
$316
LICENSED CARE FACILITY - 24 HOURS
59 Inspection of a 24-hour licensed care facility, including: Social Rehabilitation Facility, Residential Care Facility, Assisted Living, Residential Care Facility for the Elderly, Halfway Houses, Community Correction Centers, Re-entry Centers, Treatment Programs, Work Furlough, Alcoholism or Drug Abuse Recovery/Treatment Facility, Congregate Living Health Facility, Group Homes, Immediate Care Facility, and Infant Care Facility. a) Base Fee. $316
b) Plus $ 4.00 per unit/occupant. $4
c) Inspection of a 24-hour Infant Care Facility for children 2 ½ years of age and younger. i )Base Fee. $316
ii) Plus $ 4.00 per unit/occupant. $4
60 LICENSED CARE FACILITY - LESS THAN 24 HOURS
Inspection of a non-24-hour license care facility with occupant load greater than 6, including:

Adult Day Care, Adult Day Support Center, Child Day Care, Infant Day Care, and Large Family Day Care Home.
a) Adult or Day Care Facility (non-ambulatory) $316
b) Adult or Child Large Family Day Care $316
c) Adult or Child Day Care Center $316
d) Inspection of a Licensed Clinic $316
61 SCHOOLS - (E Occupancy)
Permit to operate and maintain a school.
a) Occupant load less than 50. $395
b) Occupant load 50-149. $632
c) Occupant load 150-499. $632
d) Occupant load 500 or greater. $948
62 HIGH-RISE/MID-RISE - FIRE & LIFE SYSTEM

SAFETY INSPECTION
a) High Rise Inspection of a Hi-Rise building (State certification inspection) - Pre 1974. $2,528 b) High Rise Inspection of a Hi-Rise building (State certification inspection) - Post 1974. $632 c) Plus $.006 per sq. ft. .006 / sq. ft.
26

Page 182 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
63 Mid-Rise
a) Inspection and test of life safety systems (e.g., smoke management), including where such systems are installed in lieu of fire department access or when required for the mitigation of other life safety issues or requirements.
$632
b) Plus $.006 per sq. ft. .006 / sq. ft.
64 HOSPITALS – INSTITUTION / JAILS - Hospitals (medical, surgical, and psychiatric) and Nursing Homes
a) Inspection of hospital or nursing home. $632
b) Plus $ 4.00 per patient/bed. $4
65 Out-Patient Clinics
a) Inspection of out-patient clinic with more than 5 patients. $316 b) Plus $ 4.00 per unit/occupant. $4
66 Police Services Facilities (holding cells)
Inspection of police services facilities and DOJ review (includes the approval of Evacuation & Life Safety Procedures).
$316
67 Adult/Juvenile Detention Facilities
Inspection of adult and/or juvenile detention facilities. $948
MULTI-RESIDENTIAL - (hotel, motel, apartments, condominiums) 68 Motel/Hotel
a) Inspection of a hotel or motel. $474
b) Plus $ 4.00 per unit. $4.00 / unit
69 Apartments/Condominiums
a) Inspection of apartments or condominiums, three stories or more. $474 b) Plus $ 4.00 per unit. $4.00 / unit
c) Inspection of apartments or condominiums, less than three stories. i) 3 – 12 units, base fee. $115
ii) 13 - 30 units, base fee. $158
iii) Plus $ 3.00 per unit. $3.00 / unit
iv) 31 or more units, base fee. $158
v) Plus $ 4.00 per unit. $4.00 / unit
70 BURNING PERMIT - Agricultural Burn Permit - BAAQMD 5-401.11 a) Range Management. $158
b) Open Burning: Recreational-Bonfire Permit. Religious $316 c) Service Burn Permit. N/C

FALSE ALARMS
71 Nuisance (Repeated) False Alarms
Engine company response, after three (3) reported false alarms within a 180- day period.

Includes: alarm sounding, water-flow alarms, and smoke or heat detectors. $457
27

Page 183 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note

MISCELLANEOUS INSPECTIONS
72 Change of Occupancy/Site Inspection/Miscellaneous Inspection Site, miscellaneous, or requested inspection for a change of occupancy, including, but not limited to, inspections conducted when required by Building Official, Planning, or other governmental agency, and where not elsewhere listed. Provides 1 hour of inspection time. $316
73 Third or Non-Compliant Inspections
Inspection for third and/or non-compliant inspections, per inspection. $316
74 Group B/M Occupancy
a) Inspection of Group B/M Occupancy. Provides 1/2 hour of inspection time. $158 b) Additional inspection time, per 1/2 hour. $158
75 HOURLY INSPECTION – OVERTIME - INSTRUCTIONAL RATES
a) Additional inspection or instructional time during normal business hours, per half hour. $158 b) Additional inspection time or instructional time after normal business hours, per hour. $316 76 Overtime and weekend inspections: Two hour minimum fee. $632

COPY SERVICES
77 Photocopies
Letter or legal size, per page.
$ .20 / page
78 Laserfiche Retrieval
a) Minimum fee, provides ¼ hour. Additional time, per ¼ hour. $11 b) Plus $.20 per page. $ .20 / page
79 Copies of Photos - Fee, per ¼ hour. Plus actual cost of photos. $11 ● Inspection fees are based on $316.00 per hour during normal business hours. ● Normal business hours are between 8am - 5pm, Monday – Friday. ● Inspection and/or permit fees will be assessed at the time of the primary inspection. ● All inspection/permit fees include one (1) primary and one (1) re-inspection, unless otherwise noted.
● Occupancies requiring three (3) or more inspections for compliance will be assessed an additional $316.00 fee for each inspection.

Authority
Health & Safety Code: §§ 12101, 12640, 13109, 13113, 13116, 13131.5, 13143.2 (b), (c), (d), (e), 13143.9, 13145, 13146(a)(1)(b), (c), (e), 13146.1, 13146.2 (a), (b), 13146.3, 13916, 13235, 13862, 13869, 13869.7, 13875, 13874, 17921, 17948, 17962; Government Code: §§ 6103.7, 6253(b); California Fire Code: §§ 101.1, 101.2, 103.1, 103.2, 103.3, 105.1, 105.4, 901.2; Title 19, CCR: §§ 1.12, 3.28, 982, 1565.1, 1033, 1034, and 1035; Fire District Ordinance No. 2019-37. 28

Page 184 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Fee * Note

FIRE ENGINEERING AND PLAN REVIEW FEES

PLAN REVIEW
Preliminary Plan Review - Consultations - Meetings
1 In office design review/preliminary plan consultation meetings. Per half hour $158 2 Out of office design and/or consultation meetings.
$316.00 per hour, two (2) hour minimum
$632
Land Development
3 Major Subdivision Plan Review (5 or More Lots/Parcels) a) Review for access, hydrant placement
Fee includes two (2) hours plan review and one (1) visual inspection $948
b) Each additional site inspection, per hour $316
c) Re-submittals or revision $316
d) Additional plan review time, per half hour $158
4 Minor Subdivision Plan Review (1 to 4 Lots/Parcels)
a) Review for access, hydrant placement
Fee includes 1/2 hour plan review and one (1) visual inspection $474
b) Each additional site inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
5 Single Family Home Review - access and water supply
a) Review for access, hydrant placement
Fee includes 1/2 hour plan review and one (1) visual inspection *(Does not includes review of fire sprinkler systems - see Section 5.4) $158
b) Each inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
6 Multi-Family Home Review - access and water supply
a) Review for access, hydrant placement
Fee includes two (2) hours plan review and one (1) visual inspection $948
b) Each additional site inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
7 Commercial Facility review - access and water supply
a) Review for access, hydrant placement
Fee includes one (1) hour plan review and one (1) visual inspection $632
b) Each additional site inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
Activity Description
29

Page 185 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
Temporary Access Roads and Water Supply
8 Install a Temporary Access Road - Residential and Commercial a) Minimum plan review base fee for one (1) and two (2) homes $316 b) Minimum plan review for large developments and commercial projects Fee includes one (1) hour plan review and one (1) field inspection $632
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
9 Install a Temporary Water Supply System
a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) field inspection $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
Water Supply - Fire Service Mains - Fire Hydrants
10 Fire Service - Emergency Repair
a) Review of underground piping, placement and size
Fee includes one (1) hour plan review and one (1) visual inspection $632
b) Each additional inspection, per hour $316
c) Additional plan review time, per half hour $158
11 Private Fire Service Mains
a) Minimum plan review base fee of system
Fee includes one (1) hour plan review and one (1) visual inspection $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour
Fire service main installation also requires hydro and flush. See 12 and 13. $158
12 Flush - Private Fire Service System
a) Minimum inspection base fee
Fee includes one (1) hour onsite inspection time
$316
b) Each additional inspection, per hour $316
13 Hydrostatic Test - Private Fire Service System
a) Minimum inspection base fee
Fee includes one (1) hour onsite inspection time
$316
b) Each additional inspection, per hour $316
14 Water Flow Information (office only, no field test required) a) Fee for water flow information
(Fire District information must be current within 6 months) $158
15 Water Flow Information Field Test
a) Minimum field test base fee
Fee includes field test for available fire flow for Hydrant and Fire Sprinkler Systems $632
b) Additional or multiple flow tests, per half hour $158 30

Page 186 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
16 Rural Water Supply
a) Minimum plan review base fee of tank and underground piping Fee includes one (1) hour plan review and one (1) visual inspection $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
e) Rural water supply flush $316
Building Construction - New Buildings and Tenant Improvements 17 New Construction or Building Additions Plan Review
a) Minimum plan review base fee $948
b) Plus $.07 per square foot in excess of 2000 sq. ft.

Fee includes two (2) hours plan review and one (1) field inspection $.07 / sq ft
c) Additional inspections, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
18 Tenant Improvement Plan review (for building additions see 17) a) Minimum plan review base fee $632.00 $632
b) Plus $.07 per square foot in excess of 2000 sq. ft.

Fee includes one (1) hour plan review and one (1) field inspection $.07 / sq ft
c) Additional inspections, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
Fire Protection System
19 Tenant Improvement Fire Sprinklers (without calculations) a) Minimum plan review base fee $632
b) Plus $.50 per head in excess of 10 heads
Fee includes 1.5 hours plan review and one (1) field inspection $.50 / head
c) Each additional inspection (e.g., weld-o-let, hydro, visual, etc.), per hour $316 d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
20 Tenant Improvement Fire Sprinklers (with calculations) a) Minimum plan review base fee $790
b) Plus $.50 per head in excess of 10 heads
Fee includes 1.5 hours plan review and one (1) field inspection $.50 / head
c) Each additional inspection (e.g., weld-o-let, hydro, visual, etc.), per hour $316 d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
31

Page 187 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
21 New Commercial Fire Sprinkler System (13 and 13 R systems) a) Minimum plan review base fee per riser $1,264
b) Plus $.50 per sprinkler head
Fee includes two (2) hours plan review and two (2) field inspections $.50 / head
c) Each additional inspection (e.g., weld-o-let, hydro, visual, etc.), per hour $316 d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
22 Residential Fire Sprinkler System (single family home) a) Minimum plan review base fee
Fee includes one (1) hour plan review, one (1) overhead hydro and one (1) final inspection $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
23 Residential Fire Sprinkler System (multiple homes)
a) Minimum plan review base fee per model
For model only - Fee includes one (1) hour plan review, one (1) overhead hydro and one (1) final inspection
$790
b) Each additional lot (hydrostatic test and final inspection) $474 c) Each additional inspection (e.g., models, individual homes), per hour $316 d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
24 Standpipe System
a) Minimum plan review base fee
Fee includes two (2) hours plan review and one (1) field inspection $948
b) Each additional inspection (e.g., hydro, flush, flow test, etc.), per hour $316 c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
25 Spray Booth
a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) field inspection $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
26 Pre-Action Fire Suppression System
a) Minimum plan review base fee
Fee includes one (1) hour plan review and two (2) field inspections *(Does not include fire alarm review - see Section 6.1) $948
b) Each additional inspection, per hour $316.00 $316
c) Re-submittals or revisions $316.00 $316
d) Additional plan review time, per half hour $158
32

Page 188 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
27 Fixed Fire Suppressions System - (wet/dry chem, water mist, etc.) a) Minimum plan review base fee $632
b) Each additional separate system at same location
Fee includes one (1) hour plan review and one (1) field inspection $316
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
28 Clean Agent Fire Suppression System
a) Minimum plan review base fee
Fee includes one (1) hour plan review and up to three (3) hours of inspection time *(Does not include fire alarm review - see Section 6.1) $1,264
a) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
29 Fire Pump Installation
a) Minimum plan review base fee
Fee includes two (2) hours plan review and up to (5) hours of field inspection time *(Does not include review of generator or separate fuel storage tank) $2,212
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
30 Commercial Cooking (Hood and Duct ) Fire Suppression System a) Minimum plan review base fee $632
b) Each additional system review
Fee includes one (1) hour plan review and one (1) hour of inspection time $316
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
31 Smoke and Heat Vents $632
a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) hour of inspection time $316
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $158
d) Additional plan review time, per half hour
32 Smoke Management/Control System
a) Minimum plan review base feex
Fee includes three (3) hours plan review and up to four (4) hours of field inspection time $2,212
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
33

Page 189 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
33 Explosion Control (includes: vents, dust collection, etc.) a) Minimum plan review base fee
Fee includes two (2) hours plan review and up to two (2) hours field inspection time $1,264
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
Fire Alarm System
34 Fire Alarm System
a) Minimum plan review base fee $790
b) Plus $10.00 per initiating and notification device
Fee includes two (2) hours plan review and up to one (1) hour of field inspection time $10.00 / device
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
f) Pre-wire inspections, per hour $316
35 Dedicated Function Fire Alarm System (i.e. sprinkler monitoring, elevator recall, etc.) a) Minimum plan review base fee $632
b) Plus $10.00 per initiating and notification device in excess of 4 devices Fee includes one (1) hour plan review and one (1) hour field inspection time $10.00 / device
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
36 Fire Alarm Panel Replacement Only
a) Minimum plan review base fee $632
b) Plus $10.00 per initiating and notification device, if altered Fee includes one (1) hour plan review and one (1) hour field inspection time $10.00 / device
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
37 High-Rise Fire Alarm (new and/or system upgrade)
a) Minimum plan review base fee $2,536
b) Plus $10.00 per initiating and notification device
Fee includes four (4) hours plan review and up to four (4) hours of field inspection time $10.00 / device
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
f) Pre-wire inspections, per hour $316
34

Page 190 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
Flammable and Combustible Liquids Under/Aboveground Tanks-Piping-Dispensing 38 Install Underground Tanks
a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) hour of site inspection time $632
b) Each additional tank $316
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
39 Remove Underground/Above-Ground Tank
a) Minimum plan review base fee
Fee includes one (1) hour plan review and two (2) hours of inspection/site time $948
b) Each additional inspection, per hour $316
40 Install Aboveground Tank
a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) hour of site inspection time $632
b) Each additional tank $316
c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
41 Abandon Underground/Above-Ground Tank in Place
a) Minimum plan review base fee
Fee includes one (1) hour plan review and two (2) hours of inspection/site time $948
b) Each additional inspection, per hour $316
42 Fuel Dispensing Modification (EVR, Dispenser change out, other component change out, etc.) a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) hour of site inspection time $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
43 Apply Interior Coating to Flammable Liquid Tanks
a) Minimum plan review base fee
Fee includes one (1) hour plan review and two (2) hours of inspection/site time $948
b) Each additional inspection, per hour $316
44 Compressed Gas Systems: LPG-CNG - Medical-Cryogenics Container Exchange Programs; LPG Tank Installation Without Dispensing a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) hour of site inspection time $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
35

Page 191 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
45 LPG-CNG-Hydrogen (Tank Install and/or Dispensing)
a) Minimum plan review base fee
Fee includes 1.5 hours of plan review and two (2) hours of site inspection time $948
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
46 Medical or Compressed Gas Systems
a) Minimum plan review base fee
Fee includes one (1) hour plan review and two (2) site inspections $948
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
47 Cryogenics Fixed Installation
a) Minimum plan review base fee
Fee includes one (1) hour plan review and two (2) site inspections $948
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
48 Compressed Gas Storage
a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) field inspection $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
Energy Storage System
49 Battery Systems/Energy Storage
a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) field inspection $632
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
Special Hazards - Hazardous Materials, Mechanical System, etc. 50 Dust Collection Systems
a) Minimum plan review base fee
Fee includes one (1) hour plan review and two (2) site inspections $790
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
36

Page 192 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
51 Explosives Storage
a) Minimum plan review base fee
Fee includes two (2) hours plan review and two (2) site inspections $1,264
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
52 Hazardous Materials Compliance review
a) Minimum review of MSDS, HMMP and/or HMIS submittals
Fee includes one (1) hour of review time
$316
b) Additional plan review time, per half hour $158
53 Hazardous Materials - Storage - Dispensing - Open/Closed Systems a) Minimum plan review base fee
Fee includes two (2) hours plan review and two (2) site inspections $1,264
b) Each additional system plan review, minimum two (2) hours $632 c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
54 High-Pile or Rack Storage
a) Minimum plan review base fee
Fee includes 1.5 hours of plan review and 1.5 hours of site inspection time $948
b) Additional field inspection time, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
55 Mechanical Refrigeration System
a) Minimum plan review base fee
Fee includes one (1) hour plan review and two (2) site inspections $948
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
56 Plant Extraction System
a) Minimum plan review base fee
Fee includes two (2) hours plan review and one (1) site inspection $948
b) Each additional inspection, per hour $316
c) Re-submittals or revisions $316
d) Additional plan review time, per half hour $158
37

Page 193 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
Miscellaneous Submittals - Alternative Means and Methods 57 Miscellaneous Submittals or Plans Review
Plans or submittals not described elsewhere
a) Minimum plan review base fee
Fee includes one (1) hour plan review and one (1) field inspection $632
b) Additional plan review time will be charged on hourly basis $316 c) Each additional inspection, per hour $316
d) Re-submittals or revisions $316
e) Additional plan review time, per half hour $158
58 Alternative Means and Methods Requests or Code Interpretation Review a) Minimum review base fee
Fee includes two (2) hours of plan review/consultation time $632
b) Additional plan review time, per half hour $158
59 Expedite Plan Review Requests and Reviews Expedited as a Result of Working without Approved Plans
a) Working without approved plans
i) Minimum plan review fees (overtime), two (2) hour minimum plus applicable plan review fees
$632
ii) Additional plan review time, per hour $316
b) Expedited Plans
i) Minimum plan review fees (reviewed after normal business hrs.), two (2) hours minimum plus applicable plan review fees
$632
ii) Additional plan review time, per hour $316
All revisions will be performed on an expedited/overtime basis at $316.00 per hour with a two hour minimum
Total fees will include all applicable plan review fees plus expedite/overtime fees 60 Demolition Permit Pursuant to Chapter 14, CFC $316
Copies, Laserfiche Retrieval
61 Photocopies - Minimum fee per page, letter or legal size $.20 / page 62 Laserfiche Retrieval
a) Minimum fee per 1/4 hour of review $11
b) Minimum fee per page, letter or legal size $.20 / page 63 Copies of Photos -$11.00 per 1/4 hour
Plus the actual cost of photos
$11
64 Instructional Services
a) Minimum instructional fee
Fee includes two (2) hours of instruction service during normal working hours $632
b) Additional plan review time, per half hour $158
38

Page 194 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee * Note
Additional Charges and Inspection Time
65 Additional inspection during normal business hours, per 1/2 hour $158 66 Additional inspection time after normal business hours, per hour $316 67 Overtime and weekend inspections, two (2) hour minimum $632 68 Re-submittals or revisions $316
69 Additional plan review time, per half hour $158
Plan Archival
70 Plan Archival - Fee to archive plans electronically, per page $2 ● Minimum review and inspection fees are based on $316.00 per hour during normal business hours, unless otherwise noted. ● Normal business hours are between 8am - 5pm, Monday – Friday. ● All overtime fees are assessed at $316.00 per hour for a two-hour minimum, unless otherwise noted. ● Overtime rates apply to weekends, holidays, and all times outside normal business hours. ● Expedited plan reviews are conducted after normal business hours. ● Total fees assessed will be the sum of all applicable plan review fees including expedite/overtime fees. ● Revisions to previously submitted plans, including plans requiring re-submittal and/or client generated changes, will be assessed $316.00 for each hour of plan review. Reviews conducted and requiring more than one hour of plan review time during normal business hours will be assessed $158.00 per half hour.

Authority
Health & Safety: §§ 13114, 13131.5, 13143.2 (b, c, d, e), 13145, 13147, 13143.9, 13146 (a) (1) (b), (d), e), 13862, 13869, 13869.7, 13875, 13916, 17921, 17951, 17962 Government Code § 7303.7, 6253(b)
Fire District Ordinance: No. 2019-37
Title 19, CCR: § 1.12(a) & 3.28
California Fire Code: § 101.1, 101.2, 103.1, 103.2, 103.3, 105.1, 105.4, 901.2 * These fees are intended to mirror fees authorized by the Contra Costa County Fire Protection District. The District provides fire prevention services to the City of Pinole, under contract. If the District updates fees subsequent to the adoption of this schedule, this schedule shall be presumed to reflect updated amounts. In the case of discrepancies, fee amounts authorized by the District shall supersede the amounts listed above.
39

Page 195 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - POLICE FEES
Fee Charge Basis Note
1 Vehicle Release
a) Vehicle Release $120
b) Victim (stolen car, etc.) Reduction No Charge
2 Fingerprinting fee
a) Live Scan-Residents (Service Fee) $40
b) Live Scan- Non-Residents (Service Fee) $50
c) Live Scan FBI Clearance $19 set by FBI
d) Live Scan DOJ Clearance $32 set by DOJ
3 Clearance Letter: Local Criminal History Check - Resident $25 4 Report Copies (No charge for domestic violence victims 530.5 PC(Identity Theft) and Face Page of Traffic Collision)
$1 per each 5 pages
5 Citation sign-offs
a) Residents Free per citation
b) Non-Residents (non-Pinole issued citation) $10 per citation 6 VIN Verification $30 per verification
7 Weapons Seizure, Storage & Return $125 each
8 Non-civil Subpoenas Actual Cost*
9 Sealing of Records Action Cost*
10 Audio/Video Tape Copies Actual Cost* + m'tls cost
11 Photographic prints Actual Cost* + m'tls cost
12 Restitution & Cost Recovery Actual Cost*
13 Statistical Report (datatrieve) Actual Cost*
14 Military Records Checks $15
15 Inspection of Records No Fee (per GC 6253(a)
16 Criminalistics Analysis and Investigative Services Actual Cost* 17 Civil Subpoena $6 per 1/4 hour per person
plus reproduction costs
18 Civil Subpoena appearance Actual Costs ($150
deposit) (Per GC 68096.1)
Activity Description
40

Page 196 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - POLICE FEES
Activity Description Fee Charge Basis Note
19 Repossession Reimbursement $15.00 (Per GC 41612)
Police Permits
20 Firearms Dealer's Licensing
a) Firearms Dealer's Licensing (initial fee) $325
b) Firearms Dealer’s Licensing (annual fee) $200
c) Penalty for Late Application of Firearms Dealer's License 50% of License fee + License fee
21 Carry Concealed Weapon Permit
a) Initial Application $200
b) Renewal & Amendments Actual Cost*
c) Psychological Testing Initial Application $150
22 Rotation Tow Franchise Fee $300
a) New driver (annual) $25
b) Renewal driver (annual) $10
Miscellaneous Permits
23 Taxi Permit Processing Fee (each) PMC 5.16.030 $104
24 Parade Permit $30
25 Special Event Permit $30
26 Alcohol Beverage Fee (per event) $75
27 Solicitor License PMC 5.16.130 $104
28 Massage Operator Permit-Resident $675
29 Massage Operator Permit-Non-Resident $680
30 Special Requests for Police Services Overtime Rate
41

Page 197 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - POLICE FINES
Fee Code Note

PARKING VIOLATION FINES
1 Stop/Stand/Park within any Parkway $40 PMC 10.40.020
2 Parking in violation of curb markings $40 PMC 10.40.030B 3 Unlawful Parking—Div. Island $40 PMC 10.40.040A
4 Parking in Red Zone $40 PMC10.40.040B
5 Red Zone $40 PMC 10.40.040C
6 No Parking Zone $40 PMC 10.40.040D
7 Parking-Traffic Hazard $60 PMC 10.40.040F
8 Temporary No Parking $40 PMC 10.40.040G
9 Red Zone $40 PMC 10.40.040H
10 Storage of Vehicles Prohibited $60 PMC 10.40.050
11 Parking for Demonstration $40 PMC 10.40.060
12 Repairing/Greasing Vehicles on the Street $60 PMC 10.40.070 13 Washing/Polishing Vehicles $40 PMC 10.40.080
14 Parking Adjacent to Schools $40 PMC 10.40.090
15 Parking Prohibited on Narrow Streets $40 PMC 10.40.100 16 Parking on Grades $60 PMC 10.40.110
17 Unlawful Parking on Grade $60 PMC 10.40.110
18 Vending on Streets-Permit Required $60 PMC 10.40.120 19 Emergency Parking-Signs $40 PMC 10.40.130
20 Twenty-Four (24) Minute Parking $40 PMC 10.40.140
21 Forty (40) Minute Parking $40 PMC 10.40.150
22 One Hour Parking $40 PMC 10.40.160
23 Two Hour Parking $40 PMC 10.40.170
24 Parallel Parking—One-way Street $40 PMC 10.40.180
25 18 Inches from Curb $40 PMC 10.40.180A
26 Posted No Parking Zone $40 PMC 10.40.180B
27 Diagonal Parking $40 PMC 10.40.190
28 Parking Outside of Line $70 PMC10.40.190A
29 Parking Space Markings $40 PMC 10.40.200
30 Parking Space Markings $40 PMC 10.40.200B
31 No Stopping Zones $40 PMC 10.40.210B
32 Commercial Vehicle—Parking Restrictions $120 PMC 10.40.220 33 Off Truck Route $120 PMC 10.40.220B
Activity Description
42

Page 198 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - POLICE FINES
Activity Description Fee Code Note
34 Commercial Vehicle—Curb Parking $120 PMC 10.40.230
35 Private Parking Facilities $40 PMC 10.40.240
36 Vehicle Longer 20’—Parking Restrictions $40 PMC 10.40.250 37 Preferred—Local Authority Designation $40 PMC 10.40.260 38 Disabled Parking $300 PMC 10.40.270
39 Unlawful Parking—Off Roadway $40 PMC 10.40.280
40 Unlawful Parking—Off Road $40 PMC 10.40.280A
41 Unlawful Parking—Private Property $40 PMC 10.40.280B 42 Curb Markings $40 PMC 10.44.020
43 Red Zone $40 PMC 10.44.020A
44 Yellow Zone $40 PMC 10.44.020B
45 White Zone $40 PMC 10.44.020C
46 Blue Zone $300 PMC 10.44.020D
47 Green Zone $40 PMC 10.44.020E
48 Adherence to Curb Markings $40 PMC 10.44.020F
49 Loading and Unloading $22 PMC 10.44.030
50 Parking in Passenger Loading Zone $40 PMC 10.44.040
51 Parked in Bus Zone $250 PMC 10.44.050E
52 Parked Off Truck Route $120 PMC 10.48.040B
43

Page 199 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - SPECIAL EVENT AND FILM PERMIT APPLICATION REVIEW FEES Fee Note
1 Special Event Permit
a) Application Fee
i) Event that requires limited site/plan review, no closures, etc. (i.e. park rentals/activities, misc. events, etc.)
$162 [a]
ii) Event that requires, but not limited to, street/parking lot closures, site/plan review, etc. (i.e. fun runs, festivals, etc.)
$323 [a]
b) Service Charges actual costs
c) Park/facility rental fee varies by location
2 Photography and Filming Permit
a) Application Fee
i) Cast and Crew Totaling One to Three Persons $162 [a],[b] ii) Cast and Crew Totaling Four or More Persons; or with Street Closure $323 [a],[b] b) Service Charges actual costs
[a] Application fees are non-refundable.

Activity Description
[b] Non-commercial photography and photography/film not requiring exclusivity does not need a permit. Film permit application fees may be waived for bona fide student film/photography projects and non-profit projects. The permitting process for filming/photography is still applicable for these projects (i.e. permit is required). Service charges are still applicable. 44

Page 200 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - RECREATION DEPARTMENT FEES
Fee Note
1 Tiny Tots
a) M/W/F a.m.
i) Resident Monthly $298
ii) Non-resident Monthly $347
b) M/W/F p.m.
i) Resident Monthly $247
ii) Non-resident Monthly $289
c) T/Th
i) Resident Monthly $167
ii) Non-resident Monthly $192
d) Summer M/W/F
i) Resident (per 4 week session) $328
ii) Non-Resident (per 4 week session) $381
e) Summer T/Th
i) Resident (per 4 week session) $272
ii) Non-Resident (per 4 week session) $317
f) Late Pick Up
i) Within 15 minutes After Grace Period $22
ii) Every 10 Minutes Thereafter $22
g) Late Payment
i) After the 7th of the Month $14
ii) After the 15th of the Month $43
h) Administrative
i) Membership Fee $54/ per session
2 Athletic Fields
a) Youth and Adult Leagues
i) Resident/Pinole Organizations-Hourly $17
ii) Non-Resident/Non-Pinole Org.- Hourly $25
b) Restroom Key Deposit-refundable $54
c) Lighting Fee at Fernandez Park $13
3 Tennis Courts
a) Weekdays
i) Resident $6.00 / hr / court
ii) Non-Resident $8.00 / hr / court
b) Weekends and Holidays
i) Resident $8.00 / hr / court
ii) Non-Resident $11.00 / hr / court
c) Commercial Use—Instructor Fee $11.00 / hr / court
Activity Description
45

Page 201 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - RECREATION DEPARTMENT FEES
Activity Description Fee Note
Park Rentals
1 Fernandez Park BBQ Area- per day
a) Resident $130
b) Non-Resident $163
2 Gazebo-per day
a) Resident $296
b) Non-Resident $370
3 Inflatable Jumper Fee
a) Resident $54
b) Non-Resident $81
4 Pinole Valley Park BBQ Area-per day-per area
a) Resident $65
b) Non-Resident $98
5 Restroom Key Deposit- refundable $54
6 Cleaning / Damage Deposit - refundable $215
Youth Center
7 Enrichment Sessions at Schools
a) Resident Varies based on enrichment
sessions and provider
b) Non-Resident Add 10% to resident
8 Enrichment Sessions at PYC
a) Resident Varies based on enrichment
sessions and provider
b) Non-Resident Add 10% to resident
9 Summer Camp-Weekly
a) Resident $237
b) Non-Resident $276
10 Camp Extended Hours (camp Participants Only)
a) Resident $45
b) Non-Resident $51
11 Leader In Training Program-Summer
a) Resident $118
b) Non-Resident $142
12 Contract Camps 20% to 40% markup
46

Page 202 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - RECREATION DEPARTMENT FEES
Activity Description Fee Note
13 School Break Camps
a) Resident $237
b) Non-Resident $276
14 Drop-In Activities Varies
15 Late Payment $15/week & increases $11 each
subsequent week
16 Late Pick Up $1.00/minute after
5-minute grace period
17 Days Off Care (Hours 8:30am – 6:00pm)
a) Members/Resident $57 day
b)Non-Members/Resident $76 day
c) Member/Non-Resident $62 day
d) Non-Member/Non-Resident $94 day
18 Extended Care (7:00-8:30 am) $36 day
Senior Center
19 Drop-In Classes
a) Member $2 - $8 per class
b) Non-Member $3 - $9 per class
20 Daily Lunch Program
a) Member $8 - $13
b) Non-Member $10 - $15
21 Special Activities/Food Items $1 - $15
22 Special/Themed Luncheons
a) Member $15 - $20
b) Non-Member $17 - $22
23 Salon Services $15 - $45
a) Shampoo/Set/Blow Dry $15
b) Hair Cut and Blow Dry $25
c) Hair Cut $15
d) Shampoo and Set $15
e) Color $35
f) Perm $60
g) Highlights $45 & up
24 Fundraiser Events $5 - $80
25 Monthly Social Dance $12
26 Alcoholic Drinks $3 - $12
27 Annual Pancake Breakfast $10 - $12
28 Annual Membership $30
29 Travel Varies based on trip cost
47

Page 203 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - RECREATION DEPARTMENT FEES
Activity Description Fee Note
Classes
30 Adult and Youth Classes
a) Resident 40% of Instructor Fee plus $7.00
Processing fee
b) Non-Resident Add 10% to Resident fee
Community Events
31 Booth Fees
a) For Profit Pinole Business $89
b) For Profit-Non-Pinole Business $118
c) Non-Profit $35
32 Senior Center Craft Fair $25 - $55
Facility Rental
(Non-Profit Rates Apply to 501(c)3 Nonprofits, Faith Organizations and Schools only) 33 Alcohol Permit $78
34 Certificate of Insurance Purchase (for Quinceaneras only/per Diversified Risk Mgmt) (Certificate required but may be provided by renter’s insurance company at no cost) $189
35 Alcohol Use Insurance
(Must be purchased in conjunction with Certificate of Insurance or provided by renter’s insurance at no cost)
$621
36 Senior Center Main Hall (100-250 Capacity)
a) Booking $56
b) Deposit
i) Deposit without alcohol permit $563
ii) Deposit with Alcohol Permit $845
c) Table and Chair Setup $59
d) Table and Chair Takedown $59
e) Decoration/Clean Up Time (up to 2 hrs) $51 per hour; 2-hr max. f) Rental Rate
i) Resident (5 hours) $739
ii) Non-resident (5 hours) $917
iii) Resident for each add'l hour $106
iv) Non-resident for each add'l hour $142
g) Change of Date Fee
i) Change of Date Fee $237
ii) Change of Date Fee (Less than 75 Days) $355
48

Page 204 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - RECREATION DEPARTMENT FEES
Activity Description Fee Note
37 Senior Center Main Hall - Non-Profit Rates (Weekends) a) Booking $56
b) Deposit $282
c) Table and Chair Setup $56
d) Table and Chair Takedown $56
e) Decoration/Clean Up Time (up to 2 hrs) $51 per hour; 2-hr max. f) Rental Rate
i) Pinole Organization (5 hours) $451
ii) Non-Pinole Organization (5 hours) $563
iii) Pinole Org. each add'l hour $56
iv) Non-Pinole Org. each add'l hour $79
38 Senior Center - Computer, Arts/Crafts, & Board Room – M-F 8:30am– 4:30pm a) Non-Profit Organizations $40/rental Includes 2 hours $17/hr after
b) Private or Commercial Organizations $56/rental Includes 2 hours $29/hr after
c) Deposit $45
39 Senior Center - Computer, Arts/Crafts, & Board Room – M-F 4:30pm– 7:30pm a) Non-Profit Organizations $56/rental Includes 2 hours $29/hr after
b) Private or Commercial Organizations $85/rental Includes 2 hours $40/hr after
c) Deposit $45
40 Youth Center Main Area (120 Person Capacity)
a) Booking $56
b) Deposit
i) Deposit without alcohol permit $282
ii) Deposit with alcohol permit $563
c) Rental Rate
i) Resident (4 Hours) $282
ii) Non-Resident (4 Hours) $366
iii) Resident for Each Add’l hour $73
iv) Non-Resident for Each Add’l Hour $96
d) Decoration Time (up to 2 hours) $51.00/hr
e) Change of Date/Late Fee $84
49

Page 205 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - RECREATION DEPARTMENT FEES
Activity Description Fee Note
41 Youth Center Workshop Room (40 Person Capacity)
a) Booking $56
b) Deposit
i) Deposit without alcohol permit $282
ii) Deposit with alcohol permit $563
c) Rental Rate
i) Resident (2 hours) $83
ii) Non-resident (2 hours) $118
iii) Resident for each add'l hour $41
iv) Non-resident for each add'l hour $59
d) Decoration Time (up to 2 hours) $30.00/hr
e) Change of Date/Late Fee $59
42 Youth Center Main Area - Non-Profit Rates (Weekends) a) Booking $56
b) Deposit $282
c) Rental Rate
i) Pinole Organization (4 hours) $213
ii) Non-Pinole Organization (4 hours) $308
iii) Pinole Organization each add’l hour $47
iv) Non-Pinole Organization each add’l hour $71
d) Decoration Time (up to 2 hours) $47.00/hr
43 Alex Clark Room (50 Person Capacity) - Nonprofit meetings only a) Security Deposit $154
b) Rental Rate
i) Pinole Organization $12.00/2 hr. mtg
ii) Non-Pinole Organization $30.00/2 hr. mtg
c) Key Replacement Fee $54
50

Page 206 of 223 ends

City of Pinole

MASTER FEE SCHEDULE - WASTEWATER (SEWER) UTILITY FEES
July 1, 2018 July 1, 2019 July 1, 2020 July 1, 2021 July 1, 2022 Residential Users – Per Dwelling Unit
Single-Family $65.40 $67.37 $69.34 $71.44 $73.62
Multiple-Family [1] $55.59 $57.26 $58.94 $60.72 $62.58
Non-Residential Users, Minimum charge – based on water service size as provided by East Bay Municipal Utility District 5/8” $15.00 $15.45 $15.92 $16.40 $16.90
3/4” $22.50 $23.18 $23.85 $24.60 $25.35

1.0” $37.50 $38.63 $39.75 $41.00 $42.25

1.5” 75 $77.25 $79.50 $82.00 $84.50

2.0” $120.00 $123.60 $127.20 $131.20 $135.20

3.0” $240.00 $247.20 $254.40 $262.40 $270.40

4.0” $375.00 $386.25 $397.50 $410.00 $422.50

6.0” $750.00 $772.50 $795.00 $820.00 $845.00

8.0” $1,200.00 $1,236.00 $1,272.00 $1,312.00 $1,352.00

10.0” $1,875.00 $1,931.25 $1,987.50 $2,050.00 $2,112.50 Non-Residential Volumetric Rates are per 100 cubic feet (CCF) of water consumed, as provided by East Bay Municipal Utility District All Non-Residential $6.30 $6.49 $6.68 $6.88 $7.09
Sewer Lateral Video Inspection $85.00 $100.00
[1] Includes Accessory Dwelling Units
Activity Description
51

Page 207 of 223 ends

RESOLUTION NO. 2024-XX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PINOLE, COUNTY OF

CONTRA COSTA, STATE OF CALIFORNIA, UPDATING USER AND

REGULATORY FEES AND THE MASTER FEE SCHEDULE
WHEREAS, user and regulatory fees are established by the City Council; and
WHEREAS, the City completed a study in June 2022 to identify the cost of providing various user and regulatory fee-related services; and WHEREAS, the study examined fee-related services provided by the City, the costs reasonably borne by the City in providing those services, the beneficiaries of those services, and the revenues produced by those paying fees and charges for special services; and
WHEREAS, the City Council finds that providing these services is of special benefit to applicants both separate and apart from the general benefit to the public; and therefore, in the interests of fairness to the general public, the City desires to better recover the costs of providing these services from applicants who have sought or require the City's services by revising its schedule of fees; and WHEREAS, the City Council desires that annually the City Manager may update the fees based on the annual percentage change in the all-urban Consumer Price Index (CPI) for San Francisco-Oakland-Hayward, CA. If the CPI does not change or goes down in a given year, no change shall be made to the fee schedule that year; and
WHEREAS, in adopting this Resolution, the City Council is taking action only on those fees for the services, programs or products set forth in Exhibit “A” which have been modified from prior resolutions of the City Council. The remaining fees that have not been modified from prior resolutions shall remain in full force and effect.

NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Pinole does hereby resolve as follows:

SECTION 1: That the foregoing recitals and findings are true and correct and are incorporated herein by reference.

SECTION 2: That the City Council hereby adopts the fees, charges, and rates as set forth in attached Exhibit "A" and incorporated by this reference.

SECTION 3: That any new or adjusted fees adopted by this Resolution shall go into effect July 1, 2024.

Page 208 of 223 ends

PASSED AND ADOPTED at a regular meeting of the Pinole City Council held on the 16th day of April 2024 by the following vote:

AYES: COUNCILMEMBERS
NOES: COUNCILMEMBERS
ABSENT: COUNCILMEMBERS
ABSTAIN: COUNCILMEMBERS
_________________________________
Heather Bell, CMC
City Clerk

Page 209 of 223 ends

CITY COUNCIL
REPORT 10.B.

DATE: APRIL 16, 2024
TO: MAYOR AND COUNCIL MEMBERS
FROM: ERIC CASHER, CITY ATTORNEY
SUBJECT: CONDUCT FIRST READING OF AN ORDINANCE AMENDING SECTION

1.02.010 OF THE PINOLE MUNICIPAL CODE TO ADOPT A NEW CITY SEAL

RECOMMENDATION
Staff recommends the City Council conduct a first reading of an ordinance amending Section

1.02.010 of the Pinole Municipal Code to adopt a new City seal.

BACKGROUND
The City of Pinole first adopted its official seal on April 5, 1965. It portrayed a Native American man with arms crossed against a natural background containing water, mountains, birds, sun, and sky with a floral border frame and text: City of Pinole California 1903. In the 1990’s, the seal design and color scheme was slightly modernized. In 2013, the City Council adopted Ordinance 2013-01 adding Chapter 1.02 “City Seal, Logo and City Name” to the Municipal Code. Section 1.02.010 “City Seal” provides:

The seal of the city of Pinole is the same as that heretofore used and depicted below: A die; the form of the die shall be two circles, one inside the other. Within the smaller circle shall be a depiction of a Native American crossing his arms with the rugged eastern foothills, San Pablo Bay, the sun and three flying birds behind him. Within the larger circle on the upper part of the circle shall be imprinted the words “City of Pinole, California.” On the lower part of the circle shall be imprinted the date the city was incorporated, “1903”.

In the 1990’s, the seal design and color scheme was slightly modernized. The City of Pinole currently uses this modern version of the seal and it can be found throughout City facilities and is used in documents and media as the primary logo. Recently, the City of Pinole was prompted to examine its branding strategy as part of the Communication and Engagement Plan, adopted by City Council on October 18, 2022. A coherent brand identity represents a key piece of the City Council’s 2020-2025 Strategic Plan goal of developing marketing and branding strategies congruent with the communication plan and economic development strategies.

The City hired Tripepi Smith to design a new logo and create branding guidelines as part of

Page 210 of 223 ends

the Communication & Engagement Plan. Logo design options were presented for discussion at a City Council meeting on March 21, 2023, however, none of the initial design concepts were adopted at that meeting. Instead, the City Council approved the formation of the City Seal Ad Hoc Subcommittee to further explore options for a new City seal and logo.

The City Seal Ad Hoc Subcommittee retained Tripepi Smith and worked with staff, community members, and members of the Confederated Nations of Lisjan (Ohlone) on an extensive process which included three (3) rounds of community outreach and over twenty (20) meetings and discussions to develop the City’s new seal, logo, and branding guidelines, upon which City Council direction is now desired.

Staff gathered insights on the community's perceptions and values pertaining to the visual representation of Pinole using surveys. Survey results (Attachment B) revealed the community’s desire to include representation of the area’s Ohlone roots, and identified several natural symbols, colors, and feelings associated with Pinole. The City Seal Ad Hoc Subcommittee and staff agreed that it was important to incorporate the community’s perceptions to ensure that final designs are a collective representation of the City’s identity.

On March 19, 2024, the City Council adopted a resolution approving the City Logo and authorizing staff to bring forward an ordinance amending the Municipal Code to incorporate and formally adopt the new City Seal.
“The seal of the City of Pinole is depicted below: A die; the form of the die shall be two circles, one inside the other. Within the inner circle shall be a scene of a hawk flying into Pinole Valley. Depicted in the scene is Pinole Creek with cattails leading to San Pablo Bay, rolling fog, oak trees nestled in the foothills, and the sun behind the hawk’s silhouette. The scene shall be bordered by an acorn pattern with a green and gold ring enveloping the outside of the inner circle. Within the outer circle on the upper part of the circle shall be imprinted the words "City of Pinole." On the lower part of the circle shall be imprinted “California” and on the right and left sides of the circle shall be the date the city was incorporated, "1903.” Four stars shall separate the four worded sections in the outer circle. The outermost circle shall be a gold The City of Pinole first adopted its official seal on April 5, 1965. It portrayed a Native American man with arms crossed against a natural background containing water, mountains, birds, sun, and sky with a floral border frame and text: City of Pinole California 1903. In the 1990’s, the seal design and color scheme was slightly modernized. In 2013, the City Council adopted Ordinance 2013-01 adding Chapter 1.02 “City Seal, Logo and City Name” to the Municipal Code. Section 1.02.010 “City Seal” provides:

The seal of the city of Pinole is the same as that heretofore used and depicted below: A die; the form of the die shall be two circles, one inside the other. Within the smaller circle shall be a depiction of a Native American crossing his arms with the rugged eastern foothills, San Pablo Bay, the sun and three flying birds behind him. Within the larger circle on the upper part of the circle shall be imprinted the words “City of Pinole, California.” On the lower part of the circle shall be imprinted the date the city was incorporated, “1903”.

In the 1990’s, the seal design and color scheme was slightly modernized. The City of Pinole currently uses this modern version of the seal and it can be found throughout City facilities and

Page 211 of 223 ends

is used in documents and media as the primary logo.

Recently, the City of Pinole was prompted to examine its branding strategy as part of the Communication and Engagement Plan, adopted by City Council on October 18, 2022. A coherent brand identity represents a key piece of the City Council’s 2020-2025 Strategic Plan goal of developing marketing and branding strategies congruent with the communication plan and economic development strategies.

The City hired Tripepi Smith to design a new logo and create branding guidelines as part of the Communication & Engagement Plan. Logo design options were presented for discussion at a City Council meeting on March 21, 2023, however, none of the initial design concepts were adopted at that meeting. Instead, the City Council approved the formation of the City Seal Ad Hoc Subcommittee to further explore options for a new City seal and logo.

The City Seal Ad Hoc Subcommittee retained Tripepi Smith and worked with staff, community members, and members of the Confederated Nations of Lisjan (Ohlone) on an extensive process which included three (3) rounds of community outreach and over twenty (20) meetings and discussions to develop the City’s new seal, logo, and branding guidelines, upon which City Council direction is now desired.

Staff gathered insights on the community's perceptions and values pertaining to the visual representation of Pinole using surveys. Survey results (Attachment B) revealed the community’s desire to include representation of the area’s Ohlone roots, and identified several natural symbols, colors, and feelings associated with Pinole. The City Seal Ad Hoc Subcommittee and staff agreed that it was important to incorporate the community’s perceptions to ensure that final designs are a collective representation of the City’s identity.

On March 19, 2024, the City Council adopted a resolution approving the City Logo and authorizing staff to bring forward an ordinance amending the Municipal Code to incorporate and formally adopt the new City Seal. The ordinance would amend Chapter 1.02.010 of the Municipal Code, as follows:
“The seal of the City of Pinole is depicted below: A die; the form of the die shall be two circles, one inside the other. Within the inner circle shall be a scene of a hawk flying into Pinole Valley.

Depicted in the scene is Pinole Creek with cattails leading to San Pablo Bay, rolling fog, oak trees nestled in the foothills, and the sun behind the hawk’s silhouette. The scene shall be bordered by an acorn pattern with a green and gold ring enveloping the outside of the inner circle. Within the outer circle on the upper part of the circle shall be imprinted the words "City of Pinole." On the lower part of the circle shall be imprinted “California” and on the right and left sides of the circle shall be the date the city was incorporated, "1903.” Four stars shall separate the four worded sections in the outer circle. The outermost circle shall be a gold ring.

The City seal can also be applied in monochromatic color schemes.

Page 212 of 223 ends

At its regular meeting on March 25, 2024, the Municipal Code Update Subcommittee unanimously approved the ordinance amending Section1.02.010 of the Pinole Municipal Code with the updated image and description. The attached Ordinance (Exhibit A) reflects the amendment as approved by the subcommittee.

REVIEW AND ANALYSIS
The proposed ordinance reflects efforts to provide a coherent brand identity consistent with a key piece of the City Council’s 2020-2025 Strategic Plan goal of developing marketing and branding strategies congruent with the communication plan and economic development strategies. The proposed logo and seal is the result of input form the community including the community's perceptions and values pertaining to the visual representation of Pinole using surveys and input and design from consultant Tripepi Smith.

The City logo design was drafted by Tripepi Smith. The City seal design was illustrated by Fiona Epps, Assistant to the City Manager and Pinole resident, and vectorized by Tripepi Smith. The updated seal, new logo and branding guidelines (Attachment C) revitalizes the City's visual identity while conveying an authentic brand for the City of Pinole. Moreover, the proposed new City seal and logo incorporate elements that align with the community's identity as discovered through the community survey results.

Upon approval of the proposed Ordinance, staff will begin rolling out the new brand across both digital assets (email, social media, videos, website, etc.) and physical assets (vehicles, business cards, signage, etc.). Staff will also develop resources to assist City departments, employees, Council, and others to properly deploy the new brand assets.

FISCAL IMPACT
Funding to implement the new seal, logo and branding guidelines will largely be covered within existing department budgets. Fiscal impact for the areas of deployments that fall outside of the adopted budgets, such as City vehicle decals, and wayfinding signage, will be included as part of supplemental budget requests reviewed with the Fiscal Year 2024/25 budget in June. Larger costs, such as seal replacements inside and on the City Hall and Public Safety buildings will be considered capital improvement projects and will also be reviewed with the FY 24/25 budget.

ATTACHMENTS

Page 213 of 223 ends

A. Pinole_Ordinance City Seal & Logo

Page 214 of 223 ends

ORDINANCE NO. 2024-XXXX
AN ORDINANCE OF THE CITY OF PINOLE AMENDING SECTION 1.02.010 OF THE

PINOLE MUNICIPAL CODE TO ADOPT A NEW CITY SEAL AND LOGO WHEREAS, the City Council of the City of Pinole has adopted Ordinance 2013-01 adding Chapter 1.02 “City Seal, Logo and City Name” to the Municipal Code, adopting an official seal, which is used in the authentication of the official documents and in the conduct of official City business; and
WHEREAS, Chapter 1.02 Section 1.02.010 “City Seal” provides a description and image of the approved City seal; and
WHEREAS, the City Council has determined that a coherent brand identity consistent with a key piece of the City Council’s Strategic Plan goal of developing marketing and branding strategies congruent with the communication plan and economic development strategies is needed; and
WHEREAS, the proposed revised logo and seal is the result of input form the community including the community's perceptions and values pertaining to the visual representation of Pinole using surveys and input and design from our consultant Tripepi Smith.

NOW THEREFORE, BE IT RESOLVED, the City Council of the City of Pinole does hereby ordain as follows:

Section 1. Recitals.

The above recitals are true and correct and made a part of this Ordinance.

Section 2. Amendment.

Pinole Municipal Code Chapter 1.02 Section 1.02.010 “City Seal” is hereby repealed and replaced in its entirety follows:
“1.02.020 CITY LOGO.

The seal of the City of Pinole is depicted below: A die; the form of the die shall be two circles, one inside the other. Within the inner circle shall be a scene of a hawk flying into Pinole Valley. Depicted in the scene is Pinole Creek with cattails leading to San Pablo Bay, rolling fog, oak trees nestled in the foothills, and the sun behind the hawk’s silhouette. The scene shall be bordered by an acorn pattern with a green and gold ring enveloping the outside of the inner circle. Within the outer circle on the upper part of the circle shall be imprinted the words "City of Pinole." On the lower part of the circle shall be imprinted “California” and on the right and left sides of the circle shall be the date the city was incorporated, "1903.” Four stars shall separate the four worded sections in the outer circle. The outermost circle shall be a gold ring. The City seal can also be applied in monochromatic color schemes.

Page 215 of 223 ends
Page 216 of 223 ends

Section 3. Severability.

If any section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of competent jurisdiction, such decision will not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance and each of every section, subsection, sentence, clause, or phrase not declared invalid or unconstitutional without regard to whether any portion of the ordinance would be subsequently declared invalid or unconstitutional.

Section 4. Effective Date and Duration.

This ordinance shall take effect thirty (30) days after its final adoption.

Section 5. Publication.

The City Clerk is directed to cause this ordinance to be published in a manner required by law.

PASSED AND ADOPTED at a regular meeting of the Pinole City Council held on April 16, 2024, the City Council passed this urgency ordinance by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

IN WITNESS of this action, I sign this document and affix the corporate seal of the City of Pinole on April 16, 2024.
____________________________
Heather Bell, CMC
City Clerk

Page 217 of 223 ends

CITY COUNCIL
REPORT 11.A.

DATE: APRIL 16, 2024
TO: MAYOR AND COUNCIL MEMBERS
FROM: DAVID HANHAM, PLANNING MANAGER
SUBJECT: RECEIVE UPDATE ON STATUS OF DEVELOPMENT OF

PARKLET/OUTDOOR DINING REGULATIONS IN PINOLE AND PROVIDE

DIRECTION

RECOMMENDATION
Staff recommends that the City Council receive an update from Staff on findings from business interviews conducted in early 2024 and set a schedule for the development of permanent parklet regulations.

BACKGROUND
Outdoor dining extends eating establishments seating into the sidewalk, street and underutilized areas that can enliven the street, support economic development, and help reprioritize public space for human use.

The City of Pinole’s current regulations regarding outdoor dining were established in 2010 with a major Zoning Code Amendment in coordination with the adoption of the General Plan and Three Corridor Specific Plan. The regulations allow for outdoor dining in all zoning districts, except for residential zoning districts, with approval of an Administrative Use Permit and an Encroachment Permit (if City property is involved). An Administrative Design Review (staff-level approval) or Comprehensive Design Review (Planning Commission-level approval) may also be required depending on the size of the proposed structure.

During the COVID-19 pandemic, the City Council established an expedited, modified process through an Urgency Ordinance which allowed eating establishments the ability to utilize existing parking lots, street rights-of-way and open spaces between buildings to serve food to customers through Temporary Use Permits. On April 4, 2023, staff provided an overview of the current regulations related to outdoor dining and sought direction from the Council on the development of a recommended framework for requirements applicable to outdoor seating areas on sidewalks, in street parking areas, and on public and private property.

The framework that was reviewed and recommended by the Planning Commission included:
• Defining categories of outdoor dining
• Establishing the permitting process for outdoor dining • Describing the locations and/or zoning districts where the use is allowed. • Establishing standards of design, materials, size, and landscaping (etc.) • Considering encouraging other elements such as public art and bicycle parking • Establishing standards that address uses of the area. • Addressing parking requirements
• Addressing the transition from temporary outdoor eating areas to permanent outdoor eating areas At the April 2023 meeting the City Council reviewed the Planning Commission’s recommendation, took comments, and provided the following directions:

Page 218 of 223 ends

1. Extended the active temporary use permits through the end of the year (2023).

2. Directed Staff to review the Old Town Pinole Parking and Pedestrian Safety Study and return with suggestions regarding the report including parklets, bulb outs, wayfinding, and other goals outlined in the study.

3. Directed Staff to conduct some outreach with the goal of finding out if there was interest in creating permanent parklets or outdoor dining eating facilities and identifying the constraints among businesses (businesses with business licenses that had a component of food service and that also had storefronts or dining in the City) that would keep them from having outdoor dining The Council received an update and took the following actions at the December 5, 2023 meeting:

1. Extended the Temporary Use Permits for outdoor dining at Tina's Place and Sue's place though June 30, 2024 to provide additional time to conduct outreach and develop permanent regulations if so desired by Council; and

2. Agendize as an Old Business item on the February 20, 2024 Council meeting an update from Staff on findings from the business interviews and setting a schedule for development for permanent regulations; and

3. Directed that the development of the Active Transportation Plan consider and incorporate recommendations from the Old Town Pinole Parking and Pedestrian Safety Study, as appropriate.

This item provides an update on findings from the business interviews and sets a schedule for the development of permanent regulations.

REVIEW AND ANALYSIS
Business Interviews
Following the December 5, 2023, Council direction, Staff met with 20 food service businesses. Businesses were organized into five categories by location, as shown below:
• Downtown/Old Town
• San Pablo Avenue
• Appian Way
• Fitzgerald Drive
• Pinole Valley Road
Table 1 below summarizes results from business interviews conducted between December 2023 and January 2024. The interviews were conducted either in-person or by phone, based on the respondent's schedules.

Table 1—Results of Business Interviews
Questions Downtown
Corridor
Respondents:

Antlers, Tina’s
Place, East Bay
Coffee
Company, Bear
Claw, Sabor
San Pablo
Avenue
Corridor
Respondents:

Kimchi House,
Tachikawa,
Hunan Villa, La
Famigila
Appian Way
Corridor
Respondents: Bo
ba Birds,
Ristorante Due
Rose, Tandoor
Restaurant,
Taqueria Morena
Fitzgerald Drive
Corridor
Respondents: Me
l’s Diner, The
Cheese Steak
Shop, Mountain
Mikes, Pho
Craze
Pinole
Valley
Road
Corridor
Respondent
s: Pinole
Valley Road
-- Pho Hua,

Page 219 of 223 ends

Latino 17,
Sue’s Cafe
Five Guys,
Ala Mode
Donuts, the
Original
Red Onion
What are
your
thoughts on
parklets or
outdoor
dining areas
in Pinole, in
general? Do
you have
any
concerns
that come to
mind related
to parklets?
Business
owners think
outdoor dining
and parklets
could increase
downtown foot
traffic,
particularly on
weekends with
good weather.

Businesses
owners
expressed
concerns about
the speed on
San Pablo
Avenue and
advocate for
wider sidewalks
or traffic
calming
measures.otent
ial loss of
parking areas
and would
need additional
sidewalks.

Business
owners in this
area like the
idea of parklets
and outdoor
dining, but
based on the
placement of
the buildings,
they felt that
outdoor dining
would be more
appropriate.

The main
concern is the
wideness of
their sidewalks
and the
potential loss
of parking
areas.

The owners in
this area like the
idea of parklets
and outdoor
dining. All the
eateries in this
area would like
outdoor dining.

Their main
concern is the
need to expand
their sidewalk
areas and their
loss of parking
areas
Owners in this
area prefer
outdoor dining
over parklets,
citing feasibility
concerns. They
believe outdoor
dining facilitates
more enjoyment
of good weather.

Like other areas,
their main
concern is the
potential loss of
parking spaces
and the need for
additional
sidewalks.

The owners
like the
concept of
outdoor
dining and
parklets.

The owners
felt that in
some areas
they have
enough
room on the
sidewalk but
would not
have the
ability to
use the
parking
areas in
shopping
centers.

If the City
developed a
permanent/
enhanced
process for
parklets and
outdoor
dining, what
would you
like to see in
the
process?
For
example,
would you
prefer the
process to
remain
administrati
ve if a
business
met a
specified
set of
All owners favored a streamlined staff-level review process without a public hearing.

They preferred a 30-day timeline and specified standards to expedite approvals, enabling them to simply check off approved standards.
.

Page 220 of 223 ends

standards,
or should
there be a
discretionar
y process
(public
meetings)?
Please
specify any
constraints
(such as
monetary
cost,
physical
limitations,
staffing
limitations)
that would
hinder you
from having
outdoor
dining at
your
business?
All the
businesses in
the Downtown
corridor had
constraints.

Most of the
businesses had
cost and
staffing
limitations.

Other owners
had monetary
issues. All the
businesses had
areas they
could use for
either parklets
or outdoor
dining.

The owners in
the San Pablo
Cooridor had
staffing
limitations and
monetary
issues. The
businesses in
this corridor
that were in
favor of
outdoor dining
did not have
physical
limitations.

The Appian Way
corridor
businesses had
physical
limitations for
outdoor dining
areas. They also
had staffing
limitations. Cost
limitations are
also an issue.

The Fitzgerald
Drive corridor
businesses
constraints
consist of staff
limitations and
monetary costs.

The Pinole
Valley
businesses
have
physical
limitations
as well as
staffing
limitations
for parklets
and outdoor
dining
areas.

Would you
like to
design and
develop
your own
outdoor
dining area
or choose
from the
preapproved
option for
parklets and
outdoor
dining area?
The Downtown
Corridor
businesses
would like to
have preapproved
options for
parklets with
the ability to
add a personal
touch such as
signage, or
landscaping.

However, they
prefer to
individually
design outdoor
dining areas.

The San Pablo
Avenue
corridor
respondents
didn’t feel
parklets would
be feasible.

The owners
would like to
design their
own outdoor
dining areas.

The Appian Way
corridor
businesses
wanted to design
their own outdoor
dining areas.

However, if they
were to use a
parklet design in
the parking lots,
they would want
to have a preapproved parklet
design.

The Fitzgerald
Drive businesses
prefer to design
their own outdoor
dining areas.

They would
consider a preapproved design
only if it
expedites the
process
significantly.

Pinole
Valley Road
businesses
prefer the
flexibility to
design their
own areas.

Given their
limited
space,
implementin
g parklets or
outdoor
dining in
parking lots
would pose
challenges
for Pinole
Valley
businesses.

Would you
prefer your
area to be
private or
shared by
others? If
the area was
for
All respondents prefer private use of parklets and support an annual fee similar to an annual lease payment. They advocate for a minimal fee structure given their responsibility for maintaining their own areas.

Page 221 of 223 ends

exclusive
use, would
you or
would you
be willing to
pay an
annual use
fee?
Would you
prefer to
have
outdoor
dining area
in the
parking lot
or a parklet
on the
street?
The Downtown
businesses
were in favor of
both parklets
and outdoor
dining. They
indicated an
interest in
parklets on San
Pablo only if
the city
implements
traffic calming
measures on
San Pablo
Avenue.

The San Pablo
Avenue
business
respondents
preferred outdo
or dining in
parking lots.

The Appian Way
business
respondents
preferred outdoor
dining in parking
lots.

The Fitzgerald
Drive business
respondents
preferred outdoor
dining areas
along the
sidewalks of the
shopping centers
or in the parking
lots.

The Pinole
Valley Road
business
respondents
preferred to
have their
outdoor
dining areas
either along
the
sidewalks of
the
shopping
centers or in
the parking
lots.

Ideally, how
many
table/chairs
would you
like to see in
your
outdoor
eating area?
In the
Downtown
corridor,
business
respondents
prefer four to
five tables
allowed to seat
15–20 people.

In the San
Pablo Avenue
corridor,
business
respondents
prefer three or
four tables
allowed to seat
12–16 people.

In the Appian
Way corridor,
business
respondents
prefer two to
four tables
allowed to seat
4–8 people.

In the Fitzgerald
Drive corridor,
business
respondents
prefer three to
five tables
allowed to seat
6–12 people.

In the
Pinole
Valley Road
Corridor,
business
respondents
prefer three
to five
tables
allowed to
seat 6–10
people.

Would you
willing to be
responsible
for
maintenanc
e of the
area?
All business respondents indicated that they would be willing to be responsible for maintenance of their own outdoor dining areas.

Setting a Schedule for Adoption of Permanent Regulations Based on the Council's previous direction in 2023 and the favorable feedback from business owner interviews, Staff recommends that the Council explore permanent parklet regulations and improved outdoor dining regulations. Considering the workload of the Community Development Department, the development schedule outlined in Table 2 could be considered.

Table 2: Schedule for Development/Adoption of Permanent Regulations Month, 2024 Activity
April - May Planning Ad-Hoc Subcommittee meetings to

Page 222 of 223 ends

develop draft regulations
June Municipal Code Subcommittee meeting to
review draft regulations
July-August Planning Commission meetings to review draft regulations
September Municipal Code Subcommittee meeting to
review revised draft regulations
October City Council considers adoption of the
regulations
Temporary Use Permits
The two active parklets/outdoor dining spots permitted under Temporary Use Permits remain at Tina’s Place (2300 San Pablo Avenue) and Sue’s Place (2265 Pear Street). Both business owners express interest in pursuing permanent alternatives while simultaneously being allowed to retain their outdoor dining. The Council extended the Temporary Use Permits for both establishments until June 30, 2024, to facilitate outreach and permanent regulation development. Pursuant to the schedule for the development of permanent regulations in Table 2, there would be a lapse in time between the expiration of the Temporary Use Permits and the development of permanent regulations. To bridge this gap, the Council could consider extending the Temporary Use Permits once more.

FISCAL IMPACT
There is no fiscal impact to receiving this report.

ATTACHMENTS
None

Page 223 of 223 ends