prices as identified in Table 17.32.020-1 below:
TABLE 17.32.020-1
PRICE LIMITS FOR AFFORDABLE HOUSING UNITS
15% of the units in any
residential development
must be affordable
housing units and
reserved for:
Affordability
Proportion
Affordable
Housing Units (%)
Affordability Level
Percentage of Area Median
Income Used to Determine
Housing Costs
Income Used to
Determine
Affordable
Housing Costs (%)
Rental Developments
Very Low Income
UnitsOccupants
40% of affordable
units1
Very low income level based
on State Income Limits
(approximately 50% of Area
Median Income)below 50%
30%
Low Income
UnitsOccupants
60% of affordable
units1
Low income level based on
State Income Limits
(approximately 80% of Area
Median Income)below 80%
30%
Ownership Developments
Moderate Income
UnitsHouseholds
100% of affordable
units1
Moderate income level based
on State Income Limits
(approximately 120% or Area
Median Income)below 120%
30%
1Affordable units are at least 15 percent of total units, excluding density bonus units, as described in Section
17.32.020(A).
(Ord. 2010-02 § 1 (part), 2010)
17.32.030 EXEMPTIONS.
The requirements of this chapter shall not apply to the following types of development projects:
A. Manufactured Homes.
B. Pending Complete Applications. A project which has submitted an application for approval, which application was deemed complete by the Community Development Director prior to the effective date of this title.
C. Casualty Reconstruction Projects. The reconstruction of any residential units or structures which have been destroyed by fire, flood, earthquake, or other act of nature, which are being reconstructed in a manner consistent with the requirements of Chapter 17.14 (Nonconforming Uses and Structures). (Ord. 2010-02 § 1 (part), 2010)
17.32.040 INCENTIVES FOR ON-SITE HOUSING.
A. In the Affordable Housing Plan that is prepared and approved in accordance with Section 17.32.070 (Affordable Housing Plan Processing), the applicant shall identify the incentives or modifications requested and describe the exceptional circumstances that necessitate assistance from the city, as well as provide documentation of how such incentives increase the feasibility of providing affordable housing. Incentives will be offered only to the extent resources for this purpose are available and approved for such use by the City Council, as defined below, and to the extent that the project, with the use of incentives, assists in achieving the city's housing goals. Nothing in this chapter establishes, directly or through implication, a right of an applicant to receive any incentive from the city.
B. The following incentives may be approved for applicants who construct affordable housing units on-site:
1. Density Bonus. Consistent with California Government Code Sections 65915 through 65918, qualifying projects can receive a density bonus by right. Density bonus requirements are outlined in Chapter 17.38 (Density Bonus) of this code.
2. Fee Subsidy or Deferral. The City Council, by resolution, may subsidize or defer payment of city development impact fees and/or building permit fees applicable to the affordable housing units or the project of which they are a part. The affordability control covenant shall include the terms of the fee subsidy or deferral.
3. Design Modifications. The granting of design modifications relative to affordable housing requirements shall be the approving authority of the project. Projects qualifying for a density bonus shall be consistent with the applicable provisions under Chapter 17.38 Density Bonus and Government Code Sections 65915 through 65918, and shall require approval of the City Council and shall meet all applicable zoning requirements of the city. Modifications to typical development standards may include, but are not limited to, the following:
a. Reduced minimum setbacks;
b. Reduced minimum building separation requirements;
c. Reduced square footage requirements;
d. Reduced parking requirements;
e. Reduced minimum lot sizes and/or dimensions;
f. Reduced street standards (e.g., reduced minimum street widths); g. Reduced on-site open space requirements;
h. Increased height limitations;
i. Increased maximum lot coverage;
j. Increased floor area ratio;
k. Allowance for live-work units within multi-family residential zoning districts; l. In lieu of reduced setbacks, allowance for attached dwelling units, if shown to be necessary to make the project feasible; or
m. Other regulatory incentives or concessions proposed by the developer or the city that result in identifiable, financially sufficient, and actual cost reductions.
n. Priority Processing. After receiving the required discretionary approvals, the residential development that provides affordable housing units may be entitled to priority processing of building and engineering approvals, subject to the approval of the City Manager. (Ord. 2010-02 § 1 (part), 2010)
4. Park Fee Waivers for Additional Affordable Units. Additional deed-restricted affordable units beyond the minimum fifteen (15) percent inclusionary unit requirement, as described under Section 17.32.020, are eligible for waiver of park impact fees.
17.32.050 AFFORDABLE HOUSING DEVELOPMENT REQUIREMENTS.
Affordable housing units constructed pursuant to this chapter must conform to the following requirements:
A. Design. Except as otherwise provided in this chapter, affordable housing units shall be integrated within and reasonably dispersed throughout the project and shall be comparable in infrastructure (including sewer, water, and other utilities), construction quality, exterior design, and materials to the market-rate units. Affordable housing units may have different interior finishes and features than market-rate units so long as the interior features are durable, of good quality, and consistent with contemporary standards for new housing as determined by the Community Development Director.
B. Size. All affordable housing units shall reflect the range and numbers of bedrooms provided in the project as a whole, except that affordable housing units need not provide more than four (4) bedrooms.
A. Affordable units shall have the same exterior appearance and quality of construction as the market-rate units. Appliances and finishes in the affordable units shall be the same as in the market rate units with the same number of bedrooms.
B. Size. The size of affordable units shall be the same size as the market rate units in the development. For the purposes of this section, “same size” shall mean that the affordable units shall satisfy all of the following requirements:
1. The number of bedrooms in an affordable units shall be the same as the number of bedrooms in the market rate units. If the market rate units have varied numbers of bedrooms, the distribution of the number of bedrooms in the affordable units shall be the same percentages as in the market rate units.
2. The square footage of an affordable unit shall be no less than ninety percent (90%) of the median square footage of the market rate units with the same number of bedrooms.
3. If the affordable unit is alienable separate from the title to any other dwelling unit, the parcel on which the affordable unit is located shall be no less than ninety percent (90%) of the median square footage of the parcels on which market rate units with the same number of bedrooms are located.
C. Distribution. In a mixed-income development, affordable units shall be dispersed throughout the development. Without limiting the foregoing, in no event shall an affordable unit be adjacent to more than one other affordable unit (unless the adjacent affordable unit is located on a different floor in a multi-floor building).
Residents of affordable units shall be entitled to use all of the same amenities and facilities of the residential development as residents of market rate units within the residential development.
D .C. Availability. All affordable housing units shall be constructed concurrently with and be made available for qualified occupants at the same time as, or prior to, the market-rate units within the same project unless the city and developer agree in the Affordable Housing Agreement to an alternative schedule for development.
E. D. Affordable Housing Agreement. An Affordable Housing Agreement shall be made a condition of the discretionary planning entitlements for all qualifying projects granted a density bonus, fee subsidy, fee deferral, or design modifications.
The Affordable Housing Agreement shall include an affordable housing plan and shall be reviewed and approved by the City ManagerCity Council.
F. E. Duration of Affordability Requirement. Affordable housing units produced under this chapter must be legally restricted to occupancy by households of the income levels for which the units were designated pursuant to and in conformance with
the requirements of this title, any other applicable city regulation, and state law. (Ord. 2010-02 § 1 (part), 2010)
17.32.060 ALTERNATIVE METHODS OF COMPLIANCE.
A. Applicant Proposals. If it is not practical to construct on-site affordable housing units, the city will consider alternatives of equal value. Accordingly, the applicant may propose an alternative means of compliance with this chapter by submitting to the city an affordable housing plan. One (1) alternative the applicant may consider is the construction of affordable housing units, subject to the requirements listed below:
1. Off-site construction. All or some of the required affordable housing units may be constructed off-site if the Planning Commission (or City Council on appeal) finds that the combination of location, unit size, unit type, pricing, and timing of availability of the proposed off-site affordable housing units would provide equivalent or greater benefit than would result from providing those affordable housing units on-site as might otherwise be required by this chapter. Prior to the recordation of the final subdivision map for the proposed residential development, the applicant shall post a bond, bank letter of credit, or other security acceptable to the Community Development Director, in the amount equivalent to the cost of land and improvements for the affordable housing units, as determined by the Community Development Director, to be used by the city to meet the goals of providing affordable housing in the city in the event that the off-site affordable housing units are not completed (as evidenced by the issuance of a certificate of occupancy for such units) according to the schedule stated in the affordable housing plan submitted by the applicant.
B. Discretion and Required Finding. The approving authority for the project The Planning Commission (or City Council on appeal) may approve, conditionally approve, or reject any alternative proposed by an applicant as part of an affordable housing plan. Any approval or conditional approval must be based on a finding that the purpose of this chapter would be better served by implementation of the proposed alternative, in which the approving authority for the project Planning Commission or City Council should consider the extent to which other factors affect the feasibility of prompt construction of the affordable housing units, such as site design, zoning, infrastructure, clear title, grading, and environmental review. (Ord. 2010-02 § 1 (part), 2010)
17.32.070 AFFORDABLE HOUSING PLAN PROCESSING.
A. General. The submittal of an affordable housing plan and recordation of an approved city affordable control covenant shall be a precondition on the city approval of any Final Subdivision Map, and no building permit shall be issued for any development to which this chapter applies without full compliance with the requirement of this section. This section shall not apply to exempt projects.
B. Affordable Housing Plan. Every residential development to which this chapter applies shall include an affordable housing plan as part of the application submittal for either development plan approval or subdivision approval. No application for a tentative map, subdivision map, or building permit for a development to which this chapter applies may be deemed completed until an affordable housing plan is submitted to and approved by the Community Development Director as being complete. At any time during the formal development review process, the Community Development Director may require from the applicant additional information reasonably necessary to clarify and supplement the application or determine the consistency of the project's proposed affordable housing plan with the requirements of this chapter.
C. Required Plan Elements. An affordable housing plan must include the following elements or submittal requirements:
1. The number, location, structure (attached, semi-attached, or detached), and size (bedrooms, bathrooms, and square footage) of the proposed market-rate and affordable housing units and the basis for calculating the number of affordable housing units.
2. A floor or site plan depicting the location of the affordable housing units and the market-rate units.
3. The income levels to which each affordable housing unit will be made affordable.
4. The term of affordability for the affordable housing units.
5. The methods to be used to advertise the availability of the affordable housing units and the procedures for qualifying and selecting the eligible purchasers and/or tenants, including preference to be given, if any, to applicants who live or work in the city.
6. A schedule for completion and occupancy of the affordable housing units. For phased development, a phasing plan that provides for the timely development of the number of affordable housing units proportionate to each proposed phase of development.
7. A description of any incentives or modifications as listed in Section17.32.040 (Incentives for On-Site Housing) including a description of exceptional circumstances that necessitate assistance from the city, as well as documentation of how such incentives increase the feasibility of providing affordable housing.
8. Any alternative means, as designated in Section17.32.060.A, proposed for the development along with information necessary to support the findings required by Section 17.32.060.B for approval of such alternatives.
9. Except when prohibited by state or federal law, the plan shall require that preference shall be given to households that live or work in Pinole when selling or leasing affordable units within a development.
10.9. Any other information reasonably requested by the Community Development Director to assist with evaluation of the affordable housing plan under the requirements of this chapter.
D. Affordability Control Covenants. Prior to issuance of a grading permit or building permit, whichever is requested first, a standard City affordability control covenant must be approved and executed by the Community Development Director, executed by the applicant/owners, and recorded against the title of each affordable housing unit. If subdivision into individual property parcels has not been finalized at the time of issuance of a grading permit or building permit, an overall interim affordability control covenant shall be recorded against the residential development and shall be replaced by separate recorded affordability control covenants for each unit prior to issuance of a certificate of occupancy by the city for such units.
The affordability control covenants must identify any incentives, modifications, or terms of any fee waiver, as permitted pursuant to Chapter 17.38 (Density Bonus), approved by the city. (Ord. 2010-02 § 1 (part), 2010)
17.32.080 ELIGIBILITY.
A. General Eligibility for Affordable Housing Units. No household may purchase, rent, or occupy an affordable housing unit unless the city has approved the household's eligibility, and the household and city have executed and recorded an affordability control covenant in the chain of title of the affordable housing unit. Such affordability control covenant is in addition to the covenant required in Section 17.32.070.D.
B. Owner Occupancy. A household which purchases an affordable housing unit must occupy that unit as a principal residence, as that term is defined for federal tax purposes by the United States Internal Revenue Code. (Ord. 2010-02 § 1 (part), 2010)
17.32.090 ADJUSTMENTS.
A. Adjustments. The requirements of this chapter may be adjusted to propose an alternative method of compliance with the chapter in accordance with Section 17.32.060 (Alternative Methods of Compliance) by the city if the applicant demonstrates to the approving authority of the project Planning Commission (or the City Council on appeal) that applying the requirement of this chapter would be contrary to the requirements of the laws or the constitutions of the United States or California.
B. Timing of Waiver Request. To receive an adjustment or waiver, the applicant must make an initial request of the approving authority of the project Planning Commission for such an adjustment or waiver and provide an appropriate demonstration of the appropriateness of the adjustment or waiver required for when first applying to the Planning Commission for the review and approval of the proposed development plan or subdivision review as such review and approval is required by the City of Pinole Municipal Code.
C. Waiver and Adjustment Considerations. In making a determination on an application to adjust or waive the requirements of this chapter, the approving authority of the project Planning Commission (or City Council on appeal) may assume each of the following when applicable:
1. That the applicant is subject to the affordable housing requirements of Chapter 17.32 (Affordable Housing Requirements);
2. The extent to which the applicant will benefit from affordable housing incentives under Section 17.32.040 (Incentives for On-Site Housing); and
3. That the applicant will be obligated to provide the most economical affordable housing units feasible in terms of construction, design, location, and tenure, and subject to the requirements of Chapter 17.32 (Affordable Housing Requirements). (Ord. 2010-02 § 1 (part), 2010)
17.32.100 SEVERABILITY.
If any provision of this section or its application to any property is held to be invalid by any court of competent jurisdiction, invalidity shall not affect other provisions in this section that may be implemented without the invalid sections. To this end, the provisions and clauses of this section are declared severable. (Ord. 2010-02 § 1 (part), 2010)
8. Pinole Municipal Code Chapter 17.48 Parking and Loading Requirements [Amendment]
Full Chapter included.
Text to be removed shown in strikeout text.
Text to be added shown in bold and underline.
CHAPTER 17.48
PARKING AND LOADING REQUIREMENTS
Sections:
17.48.010 Purpose.
17.48.020 Applicability.
17.48.030 Permit and plan check requirements and exemptions.
17.48.040 General parking and loading berth requirements.
17.48.050 Number of parking spaces required.
17.48.060 Reductions in parking requirements.
17.48.070 Special parking standards for Old Town.
17.48.080 Parking requirements for the disabled.
17.48.090 Compact car requirements.
17.48.100 Parking and driveway design and development requirements.
17.48.110 Loading area requirements.
17.48.120 Bicycle parking requirements.
17.48.130 Maintenance.
17.48.010 PURPOSE.
This chapter establishes parking, loading and bicycle parking regulations in order to provide for safe, attractive, and convenient parking and ensure that parking areas are compatible with surrounding land uses. (Ord. 2010-02 § 1 (part), 2010)
17.48.020 APPLICABILITY.
A. The regulations contained in this chapter shall apply to the construction, change or expansion of a use or structure, and shall require that adequate parking spaces, loading areas, and bicycle parking areas are permanently provided and maintained for the benefit of residents, employees, customers, and visitors, within or outside of buildings or in a combination of both, in accordance with the requirements listed in this chapter. These requirements shall be in addition to any other development requirements contained elsewhere within the Zoning Code (e.g., landscaping).
B. Off-street parking and loading requirements of this chapter shall be recalculated as listed below.
1. New Uses and Structures. For all buildings or structures erected and all uses of land established after the effective date of this title, parking for vehicles and bicycles, and loading facilities shall be provided as required by this chapter.
2. Change in Use. When the use of any building, structure, or premises is changed, resulting in the required number of parking spaces to increase more than ten percent (10%), additional parking shall be provided consistent with Section
17.48.050 (Number of Parking Spaces Required). Previous parking modifications granted by the approving authority shall be null and void.
3. Change of Occupancy. Where a new business license is required, additional parking spaces shall be provided if the new occupancy would result in an increase of more than ten percent (10%) in the required number of parking spaces.
4. Modification to Existing Structures. Whenever an existing building or structure is modified such that it creates an increase of more than ten percent (10%) in the number of parking spaces required, additional parking spaces shall be provided in accordance with the requirements of this chapter. (Ord. 2010-02 § 1 (part), 2010)
17.48.030 PERMIT AND PLAN CHECK REQUIREMENTS AND EXEMPTIONS.
New parking lots and modifications or expansions to existing parking lots require the following entitlements:
A. Building Permit. New parking lot design and modifications to existing parking lots in conjunction with a substantial change in use to an existing structure shall be reviewed in conjunction with the building permit and any other land use or development permit.
B. Plan Check. Modification or improvements to an existing parking lot that impact the parking space layout, configuration, vehicular or pedestrian circulation, number of stalls or landscape planters shall require a site plan, drawn to scale, to authorize the change as consistent with the Zoning Code.
C. Exempt Activities. Parking lot improvements listed below shall be considered minor in nature if they do not alter the
number or configuration of parking stalls and therefore exempt from plan check requirements located in Section 17.12.030 (Plan Check). However, exempt activities listed herein may require other ministerial permits (e.g., building permit, grading permit).
1. Repair of any defects in the surface of the parking area, including repairs of holes and cracks;
2. Resurfacing, slurry coating, and restriping of a parking area with identical delineation of parking spaces;
3. Repair or replacement in the same location of damaged planters and curbs; and
4. Work in landscape areas, including sprinkler line repair, or replacement of landscape materials. (Ord. 2010-02 § 1 (part), 2010)
17.48.040 GENERAL PARKING AND LOADING BERTH REQUIREMENTS.
The layout of parking spaces, loading berths, and parking aisles shall comply with all the requirements listed below. These parking requirements apply to both on-street and off-street parking spaces, unless specifically stated otherwise.
A. The required parking spaces, loading berths, and parking aisles may not be located on any street right-of-way.
B. Parking Space and Drive Aisle Dimensions. Each parking space shall have a minimum size of nine (9) feet by eighteen (18) feet when outdoors and shall be free of obstructions such as columns or walls. Each parking space shall be ten (10) feet by twenty (20) feet when indoors or where columns or walls are located within the parking area. Loading space requirements and standards shall be as provided under Section 17.48.110. General parking space and drive aisle dimensions for parking lots are shown in Figure 17.48.040-1 (Parking Space and Drive Aisle Dimensions) below.
Proposed modifications to minimum aisle width may be granted upon demonstration that modifications meet applicable standards and requirements for safety and access to the satisfaction of the City Engineer and Fire Department Each loading berth shall be a minimum size of twelve (12) feet by thirty (30) feet whether indoors or outdoors.
Parking aisles shall have a minimum width of twelve (12) feet when spaces are parallel to the aisle or up to an angle of forty (40) degrees, seventeen (17) feet when spaces are at an angle of between forty (40) degrees and seventy (70) degrees, and twenty-three (23) feet when spaces are at an angle between seventy (70) degrees and ninety (90) degrees. See Figure
17.48.040-1 (Parking Space and Drive Aisle Dimensions) below for additional requirements.
FIGURE 17.48.040-1
PARKING SPACE AND DRIVE AISLE DIMENSIONS
C. Parking spaces and aisles shall have a maximum grade of seven percent (7%).
D. Each parking space and aisle shall have a minimum eight (8)-foot vertical clearance.
E. Each loading berth and access thereto shall have a minimum fifteen (15)-foot vertical clearance.
F. Each parking space and loading berth shall have vehicular access to the street, without passing over other parking spaces, unless as specifically allowed as tandem parking spaces.
G. Neither a required side yard abutting a street nor a front yard shall be used forto meet minimum off-street parking requirements. (Ord. 2010-02 § 1 (part), 2010)
17.48.050 NUMBER OF PARKING SPACES REQUIRED.
A. The following number of parking spaces shall be required to serve the uses or buildings listed, as established in Table 17.48.050-1 (Parking Requirements by Land Use). Multiple property owners may apply for an Administrative Use Permita use permit for shared parking pursuant to Section 17.48.060 (Reductions in Parking Requirements); otherwise all uses must provide the sum of the requirements for each individual use. Where the requirements result in a fractional space, the next larger whole number shall be the number of spaces required. In addition, the requirements listed below shall apply.
1. “Square feet” means “gross square feet” and refers to the sum gross square feet of the floor area of a building and its accessory buildings unless otherwise specified.
2. For the purpose of calculating residential parking requirements, dens, studies, or other similar rooms that may be used as bedrooms shall be considered bedrooms.
3. Where the number of seats is listed to determine required parking, seats shall be construed to be fixed seats. Where fixed seats provided are either benches or bleachers, such seats shall be construed to be not more than eighteen (18) linear inches for pews and twenty-four (24) inches for dining, but in no case shall seating be less than determined as required by the Building Code.
4. When the calculation of the required number of off-street parking spaces results in a fraction of a space, the total number of spaces shall be rounded up to the nearest whole number.
5. Where private streets are proposed for residential development, resident and guest parking shall be provided as determined by the approving authority in conjunction with the required planning entitlement(s). (Ord. 2010-02 § 1 (part), 2010)
TABLE 17.48.050-1
PARKING REQUIREMENTS BY LAND USE
LAND USE TYPE REQUIRED PARKING SPACES
Residential Uses
Boarding and Rooming Houses
1 space per family (based on designed
capacity) plus 0.8 spaces/employee during the
peak employment shift and 0.8 spaces per fulltime resident staff Dwelling, Single-Family
Studio unitsDwelling, Single-Family -– studio 1 space per dwelling unit (garage enclosed or covered)
One-bedroom unitsDwelling, Single-Family -
one bedroom
2 spaces per dwelling unit (garage enclosed or
covered), tandem parking spaces permitted
Two- to four- bedroom unitsDwelling, SingleFamily - two to four bedrooms 2 spaces per dwelling unit (1 space must be
garage enclosed or covered), tandem parking
spaces permitted in Old Town
Five or more bedroom unitsDwelling, SingleFamily - five or more bedrooms 3 spaces per dwelling unit (2 spaces must be
garage enclosed or covered and accessed
independently; the third space may be tandem)
SB 9 unit development See Chapter 17.71 (SB9 Urban Lot Split and Unit Development)
Dwelling, Multiple-Family
Studio units
1 space per dwelling unit (garage enclosed or
covered) plus 0.3 spaces per dwelling unit for
visitor parking
Dwelling, Multiple-Family
One-bedroom units
1 space 1.5 spaces per dwelling unit (1 space
must be garage enclosed or covered) plus 0.3
spaces per dwelling unit for visitor parking
Dwelling, Multiple-Family
Two- to three- bedroom units
1.5 spaces per dwelling unit
Four or moreTwo+ bedroom units
2 assigned spaces per dwelling unit (1 space
must be garage enclosed or covered) plus 0.3
spaces per dwelling unit for visitor parking
SB 9 unit development See Chapter 17.71 (SB9 Urban Lot Split and Unit Development)
Accessory Dwelling Unit
1 space per bedroom or ADU, whichever is less,
except parking may be waived as provided in
Chapter 17.70, Accessory Dwelling Units and
Junior Accessory Dwelling Units
Senior units, studio, one- and two-bedroom
units(Age 55 and Over) 1 space per dwelling unit. The minimum parking requirement may be waived if
affordable housing units are provided
consistent with Chapter 17.32 and the
proposed development has either paratransit
service or unobstructed access, within onehalf mile, to fixed bus route service that operates at least eight times per day.
Senior units, three + bedroom units 1 space per dwelling unit plus 1 additional offstreet space Mobile Home Park 2 parking spaces per home site
Recreation, Education, and Public Assembly Uses
Arena, Auditorium, Theater, Assembly Hall,
and Religious Institutions with Fixed Seats
Lesser of the following calculations: 1 space per
4 seats of maximum seating capacity; or 1 space
per 300 sq. ft. of gross floor area
Dancehall, Assembly Halls without Fixed
Seats, Exhibition Halls
1 space per 50 sq. ft. of gross floor area used for
dancing or assembly
Retail, Service, Medical and Office Uses
Grocery Store, Food Market 1 space per 250 sf. ft. of gross floor area Retail Sales, Banks 1 space per 300 sq. ft. of gross floor area Retail (furniture, appliances) 1 space per 500 sq. ft. of gross floor area Retail (building materials, autos, boats, RVs)
1 space per 200 sq. ft. of gross floor area used
for offices and 1 space per 300 sq. ft. of gross
floor area for sales and sales display; plus 1
space per 600 sq. ft. of gross floor area used for
repair or service; plus 1 space per 2,000 sq. ft. of
outdoor sales, sales displays and storage areas
Restaurants, Bars, and Night Clubs 1 space per 100 sq. ft. of gross floor area, excluding kitchen and other non-public areas
Veterinary Hospitals 1 space per 250 sq. ft. of gross floor area Animal Boarding and Grooming 1 space per 500 sq. ft. of gross floor area Offices, Business and Professional, including
medical 1 space per 250 sq. ft. of gross floor area
Hotels and Lodging Places
1 space per unit plus 1 space/full-time resident
staff and 1 space/employee during the peak
employment shift
Nursing Homes 1 space per 3.5 beds
Hospitals and Sanitariums Parking study required to determine parking needs
Auto-Related Services
Automobile/Vehicle Service and Repair,
Minor
1 space per 300 sq. ft. of any convenience store
and/or office space plus 1 space per service bay
if repair occurs on-site (in addition to spaces at
pumps, queuing areas for pumps, and selfservice water and air areas) Automobile/Vehicle Service and Repair,
Major
1 space per service bay (not including areas for
auto service or auto storage), plus parking for
any towing vehicles used in the operation, and 1
space per 300 sq. ft. of office area
Auto Washing 1 space per 300 sq. ft. of any indoor sales, office, or lounge areas
Schools, Private
Business, trade and other schools or
colleges
1 space per 2 full-time equivalent students
enrolled plus 1 space per employee during the
peak employment shift
Elementary Schools 1.2 spaces per employee during the peak employment shift
Small Family Daycare No additional spaces required (besides the required spaces for the residential dwelling)
Large Family Daycare 1 space per employee, with a minimum of 3 spaces provided
High Schools
1 space per 4 daytime students plus 1 space for
each employee during the peak employment
shift
Industrial, Manufacturing, and Processing Uses
Warehousing, Wholesaling, Research, and
Other Industrial
1 space per 1000 sq. ft. of gross floor area plus
1 space per four employees
B. Uses Not Listed. Other uses not specifically listed in this section shall furnish parking as required by the approving authority in determining the off-street parking requirements. The Planning Commission shall be guided by the requirements in this section generally and shall determine the minimum number of spaces required to avoid interference with public use of streets and alleys.
(Ord. 2020-04 § 2, 2020; Ord. 2010-02 § 1 (part), 2010)
17.48.060 REDUCTIONS IN PARKING REQUIREMENTS.
The required number of parking spaces may be reduced in accordance with the following requirements.
A. Shared Parking. In order to encourage efficient use of parking spaces and good design practices, the total parking requirements for conjunctive uses shall be based on the number of spaces adequate to meet various needs of the individual uses operating during the peak parking period.
1. Use permit for shared parking. An Administrative Use Permit A use permit may be approved for shared parking facilities serving more than one (1) use on a site or serving more than one (1) property. The Administrative Use Permituse permit may allow for a reduction of the total number of spaces required by this chapter if the following findings are made:
a. The peak hours of parking demand from all uses do not coincide so that peak demand will not be greater than the parking provided;
b. The efficiency of parking provided will equal or exceed the level that can be expected if parking for each use were provided separately.
2. Shared parking agreement. A written agreement between the landowners and in some cases the city that runs with the land shall be filed, in a form satisfactory to the City Attorney, and include:
a. A guarantee that there will be no substantial alteration in the uses that will create a greater demand for parking without application for approval of an amended use permit; b. A reciprocal grant of nonexclusive license among the business operator(s) and the landowner(s) for access to and use of the shared parking facilities; and
c. Evidence that the agreement has been recorded in the County Recorder's office.
B. Other Parking Reductions. Required parking for any use except a single-family dwelling, accessory dwelling unit, or two (2)-family dwelling may be reduced through approval of an Administrative Use Permita use permit by the Planning Commission.
1. Criteria for approval. An Administrative Use Permit The Planning Commission will only grant a conditional use permit for reduced parking may be approved if it finds that the project meets all of the findings for an Administrative Use Permit in Section 17.12.060 (Administrative Use Permit) and conditional use permit criteria in Section 17.12.140 (Conditional Use Permits) and that three (3) or more of the circumstances listed below are true. a. The use will be adequately served by the proposed parking due to the nature of the proposed operation; proximity to frequent transit service; transportation characteristics of persons residing, working, or visiting the site; or because the applicant has undertaken a travel demand management program that will reduce parking demand at the site. b. Parking demand generated by the project will not exceed the capacity of or have a detrimental impact on the supply of on-street parking in the surrounding area.
c. The site plan is consistent with the objectives of the zoning district and incorporates features such as unobtrusive off-street parking placed below the ground level of the project with commercial uses above or enclosed parking on the ground floor.
d. The applicant has provided on-site parking for car share vehicles via a recorded written agreement between the landowner and the city that runs with the land. Agreement shall provide for proof of a perpetual agreement with a car share agency to provide at least one (1) car share vehicle on-site.
2. Application submittal requirements. In order to evaluate a proposed project's compliance with the above criteria, the Zoning Administrator may require submittal of a parking demand study that substantiates the basis for granting a reduced number of spaces.
(Ord. 2020-04 § 2, 2020; Ord. 2010-02 § 1 (part), 2010)
17.48.070 SPECIAL PARKING STANDARDS FOR OLD TOWN.
A. Purpose. Special parking standards are established for the Old Town area for the following primary purposes:
1. Spur growth in the core of old town by not requiring uses to provide more parking spaces than presently exist in the core;
2. Manage the growth of old town by limiting the number of businesses, offices, lodges, clubs and associations in the core of old town which may generate traffic or parking demands in excess of commercial, office and public assembly parking availability, causing the overflow of traffic and parking to spill over onto adjacent residential streets;
3. Manage traffic circulation and parking capacity by periodically assessing parking capacity in the core of old town;
4. Manage traffic circulation and parking by requiring reciprocal easement agreements between new parking lots and adjacent properties zoned for public facility, commercial, office or mixed use on which new parking lots can potentially be developed. The provision of reciprocal easements is intended to reduce street traffic and the number of on-street parking spaces used by allowing customers to find a space in an adjacent parking lot which may not be full.
B. Applicability. For the purposes of these zoning regulations, the Old Town boundaries are defined by the northern side of Park Street, the eastern side of John Street, the southern side of Plum Street, and the western side of Oak Ridge Road.
C. Special Parking Requirements for Non-Residential Uses. Generally, non-residential uses in the designated Old Town area are exempt from the parking requirements outlined in Table 17.48.050-1 (Parking Requirements by Land Use).
However, new non-residential uses and non-residential uses that propose to expand by fifty percent (50%) or more, which would result in a parking demand of thirty (30%) or more spaces, may be subject to parking requirements if required criteria are met through a subsequent parking capacity assessment outlined herein.
D. Parking Capacity Assessment. In order to provide development opportunity and adequate parking in Old Town, the redevelopment agency has assembled property for shared parking and reduced standards as outlined herein to rely on this shared parking rather than compelling each business to satisfy parking demand on-site. To ensure that adequate parking remains available, the Planning Commission will periodically evaluate parking conditions in the Old Town in the form of a parking capacity assessment. Through analysis of that assessment, the Planning Commission will determine whether the then current parking supply is adequate to meet the corresponding parking demand. The following standards and criteria apply to the parking assessment and determination:
1. Assessment Frequency. The city will evaluate and monitor parking supply and demand on a regular basis. A parking capacity assessment shall be conducted the sooner of every two (2) years or after every fifth new use, that would require ten (10) or more parking spaces as outlined in Table 17.48.050-1 (Parking Requirements by Land Use).
2. Responsibility and Content. City staff shall prepare the parking capacity assessment for Planning Commission consideration. The assessment shall include average and peak parking capacity in the designated Old Town area.
3. Determination of Parking Adequacy. The Planning Commission shall find that parking is adequate if parking demand does not exceed eighty-five percent (85%) of the available capacity within a two (2)-block radius of a project.
4. Parking Controls. The Planning Commission will implement parking controls (e.g., time limits, metered parking, and remotely located employee parking) before seeking to expand parking capacity.
5. Shared Parking. The Planning Commission will consider expanding available shared public parking (e.g., a parking garage) in order to relieve individual projects of the obligation to provide parking on-site as determined by a parking management study.
E. Reciprocal Easement Agreements. Property owners of new parking lots are required to provide reciprocal easements to adjacent properties zoned for public facility, commercial, office or mixed use on which new parking lots could potentially be developed as determined by the city engineer or Community Development Director. Placement of reciprocal easements will be determined by the city engineer and/or Community Development Director. (Ord. 2010-02 § 1 (part), 2010)
17.48.080 PARKING REQUIREMENTS FOR THE DISABLED.
A. Number of Spaces, Design Standards. Parking spaces for the disabled shall be provided in compliance with the Building Code and state and federal law.
B. Reservation of Spaces Required. The number of disabled accessible parking spaces required by this chapter shall be reserved by the property owner/tenant for use by the disabled throughout the life of the approved land use.
C. Upgrading of Markings Required. If amendments to state or federal law change standards for the marking, striping, and signing of disabled access parking spaces, disabled accessible spaces shall be upgraded in the time and manner required by law. (Ord. 2010-02 § 1 (part), 2010)
17.48.090 COMPACT CAR REQUIREMENTS.
The following requirements apply to parking provided for all uses or buildings except one (1) -family and two (2)-family dwellings:
A. Up to twenty-five percent (25%) of the required number of parking spaces may be sized for compact cars.
B. Compact car parking spaces shall be at least eight (8) feet in width and sixteen (16) feet in length, and shall be clearly marked, “COMPACT CARS ONLY,” “COMPACT,” or “C.”
C. Compact car spaces shall be distributed throughout the parking lot.
D. Where a section of the parking lot is restricted to compact parking with an angle of 90 degrees, the aisle width may be reduced from the standard twenty-three (23) feet to twenty- one (21) feet. Such compact sections should be located so as to minimize the distance from the section to the appropriate building or activity. (Ord. 2010-02 § 1 (part), 2010)
17.48.100 PARKING AND DRIVEWAY DESIGN AND DEVELOPMENT REQUIREMENTS.
A. Surface Parking Area. All surface parking areas shall have the following improvements:
1. Each parking space and aisle, except those accessory to one (1)-family and two (2) -family dwellings, shall be graded, drained, and surfaced so as to prevent dust, mud, or standing water, and shall be identified by pavement markings, wheel stops, entrance and exit signing, and directional signs, to the satisfaction of the City Engineer.
2. Lighting, giving a ground-level illumination of one (1) to five (5) foot-candles, shall be provided in the parking area during the time it is accessible to the public after daylight. Lighting shall be shielded to prevent glare on contiguous residential properties.
3. Where such parking area abuts a street, it shall be separated by an ornamental fence, wall, or compact evergreen hedge having a height of not less than two (2) feet and maintained at a height of not more than four (4) feet. Such fence, wall, or hedge shall be maintained in good condition.
4. Parking spaces shall be marked and access lanes clearly defined. Bumpers and wheel stops shall be installed as necessary.
5. Landscape materials are permitted to overhang the curb/wheel stop creating a reduction in impervious surface material.
B. Driveway Location Standards. Development projects located at intersections shall be accessed as follows:
1. Driveways to access parcels located at the intersection of two (2) streets shall be gained through driveways from the lesser street. Determination of which street is lesser shall be made based on total paving width, amount of traffic, adjacent traffic controls, and likely destinations along each street in question.
2. Driveways serving parcels located at the intersection of two (2) streets shall be situated at the maximum practical distance from the intersection.
3. Where a proposed driveway is located at least seventy-five (75) feet from the nearest cross street, the requirements of subsection 17.48.090.B.1 and 17.48.090.B.2 may be waived.
C. Driveway Size and Composition. All residential driveways shall be a minimum of twenty (20) feet in length and shall be constructed with a lasting, durable surface (i.e., concrete, asphalt, grasscrete, or similar material) and shall be constructed to appropriate requirements as determined by the city. (Ord. 2010-02 § 1 (part), 2010)
17.48.110 LOADING AREA REQUIREMENTS.
A. Required Loading Spaces for Delivery and Distribution. A building, or part thereof, having a floor area of ten thousand (10,000) square feet or more that is to be occupied by any use requiring the receipt or distribution by vehicles or trucks of material or merchandise must provide at least one (1) off-street loading space, plus one (1) additional such loading space for each additional forty thousand (40,000) square feet of floor area. The off-street loading space(s) must be maintained during the existence of the building or use it is required to serve. Truck-maneuvering areas must not encroach into required parking areas, travel ways, or street rights-of-way.
B. Required Loading Spaces for Customers. Customer loading spaces allow bulky merchandise to be loaded into customers' vehicles. Each home improvement sales and service use shall provide at least two (2) customer loading spaces per business establishment or one (1) customer loading space per forty thousand (40,000) square feet of floor area, whichever is greater. Customer loading spaces shall be located adjacent to the building or to an outdoor sales area where bulky merchandise is stored and shall be clearly visible from the main building entry or through directional signage visible from the main entry. Customer loading spaces shall be not be located in such a way that they impede on-site traffic circulation, as determined by the Director of Public Works.
C. Requirements for Off-street Loading Spaces.
1. Minimum size. Each off-street loading space required by this section must be not less than twelve (12) feet wide, thirty (30) feet long, and fifteen (15) feet high, exclusive of driveways for ingress and egress and maneuvering areas.
Loading spaces for customers may be twelve (12) feet wide, twenty-six (26) feet long and twelve (12) feet high.
2. Driveways for ingress and egress and maneuvering areas. Each off-street loading space required by this section must be provided with driveways for ingress and egress and maneuvering space adequate for trucks, per city standards.
3. Location of loading areas. An off-street loading space (excluding loading spaces for customers) required by this section must not be located closer than thirty (30) feet to any lot or parcel of land in a residential district, unless such offstreet loading space is wholly enclosed within a building or on all sides by a wall not less than eight (8) feet in height. Except in industrial zoning districts, a loading door or loading dock that is visible from a public street must be screened with an eight (8)-foot-high, solid masonry or other sound-absorbing wall, with landscaping planted between the wall and the right-of-way. (Ord. 2010-02 § 1 (part), 2010)
17.48.120 BICYCLE PARKING REQUIREMENTS.
A. Applicability. Bicycle parking shall be provided for all new construction, additions of ten percent (10%) or more floor area to existing buildings, and changes in land use classification. Single-family homes, duplexes, and multi-family dwellings of less than four (4) units are exempt.
B. Number of Required Bicycle Parking Spaces. The required minimum number of bicycle parking spaces for each use
category is shown on Table 17.48.120-1. Uses that are not listed in the table are not required to provide bicycle parking.
Required bicycle parking may be provided in floor, wall, or ceiling racks.
TABLE 17.48.120-1
REQUIRED BICYCLE PARKING
Use Classification Bicycle Parking Spaces
Residential
Multiple-Family Residential, Group Housing, or
Transitional Housing 1 space per 4 units
Public, Semipublic, and Service
Community Center, Religious Facility, or
Cultural Institution
1 space per 40 seats or 1 space per 500 sq. ft.
of assembly area, whichever is greater
Government Offices 1 space per 10,000 sq. ft.
Hospitals and Clinics
Hospitals 1 space per 50 beds
Clinics 1 space per 3,000 sq. ft.
Park and Recreation Facilities To be determined by the Zoning Administrator Parking Facilities, Public 1 space per 20 auto spaces
Schools, Public or Private
Elementary 2 spaces per classroom
Junior High, High School 4 spaces per classroom
Commercial and Entertainment
Animal Sales and Services (except Kennels) 1 space per 10,000 sq. ft., minimum of 2 spaces per establishment
Banks and Other Financial Institutions 1 space per 10,000 sq. ft., minimum of 2 spaces per establishment
Business Services 1 space per 10,000 sq. ft., minimum of 2 spaces per establishment
Commercial Recreation To be determined by the Zoning Administrator Eating and Drinking Establishments 1 space per 10,000 sq. ft., minimum of 2 spaces per establishment
Food and Beverage Sales Offices 1 space per 10,000 sq. ft., minimum of 2 spaces per establishment
Live/Work Unit 1 space per 4 units
Retail Sales 1 space per 10,000 sq. ft., minimum of 2
spaces per establishment
Theaters 1 space per 40 seats
Business and Professional Offices
Medical and Dental 1 space per 10,000 sq. ft., minimum of 2 spaces per establishment
Personal Service 1 space per 10,000 sq. ft., minimum of 2 spaces per establishment
C. Location. Bicycle parking must be located on the site of the use it serves, generally within fifty (50) feet of an entrance to the building it serves unless otherwise approved. In the case of a multi-tenant shopping center, bike parking must be located within fifty (50) feet of an entrance to each use it serves.
D. Bicycle Lockers. Where required bicycle parking is provided in lockers, the lockers must be securely anchored.
E. Bicycle Racks. Required bicycle parking may be provided in floor, wall, or ceiling racks. Where required bicycle parking is provided in racks, the racks must meet the following requirements:
1. The bicycle frame and one (1) wheel can be locked to the rack with a high-security U-shaped shackle lock if both wheels are left on the bicycle;
2. A bicycle six (6) feet long can be securely held with its frame supported so that the bicycle cannot be pushed or fall in a manner that will damage the wheels or components; and
3. The rack must be securely anchored.
F. Special Requirements for Long Term Bicycle Parking. Mixed-use and high-density residential development have
special long-term bicycle parking needs. As such, required spaces for such uses shall be designed and located to maximize security in one (1) or more of the following locations/ways:
1. In a locked room.
2. In an area that is enclosed by a fence with a locked gate. The fence must be either eight (8) feet high or be floor to ceiling.
3. Within view of an attendant, security guard or employee work area.
4. In an area that is monitored by a security camera.
5. Within a dwelling unit, dormitory, or other group housing unit, live/work unit, or artists' studio. If provided within a unit, racks or lockers are not required.
G. Parking and Maneuvering Areas. Each required bicycle parking space must be accessible without moving another bicycle. There must be an aisle at least five (5) feet wide adjacent to all required bicycle parking to allow room for bicycle maneuvering. Where the bicycle parking is adjacent to a sidewalk, the maneuvering area may extend into the right-of-way.
The area devoted to bicycle parking must be hard surfaced.
H. Visibility. If required bicycle parking is not visible from the street or main building entrance, a sign must be posted at the main building entrance indicating the location of the bicycle parking. (Ord. 2010-02 § 1 (part), 2010)
17.48.130 MAINTENANCE.
The minimum number of parking spaces required in this chapter shall be provided and continuously maintained. A parking, loading or bicycle parking area provided for the purpose of complying with the requirements of this chapter shall not be eliminated, reduced or converted unless equivalent facilities approved by the approving authority are provided elsewhere in compliance with this chapter. (Ord. 2010-02 § 1 (part), 2010)
Attachment C. Housing Element Programs Associated with
Revisions
Yellow highlighted text was addressed in set A (ADU, JADU, SB9) Green highlighted text was addressed in set B (ADU Amnesty) Blue highlighted text was addressed in set C (Parking, Affordable Housing, Review Process) Program 4. Facilitate ADU Production
To encourage and increase ADU production in the City, a number of efforts are included. The programs are intended to help the City meet its target projection of three ADUs per year.
This program works in conjunction with Program 23, ADU, JADU, and SB 9 Education. If annual production and affordability rates do not match the estimates included in the Housing Resources Section, the City will update the ADU strategy to ensure that the City continues to maintain adequate capacity for all income levels. • Updated ADU Ordinance. The City has submitted its ADU ordinance to the State and the State acknowledge that the ordinance was received. Should the State require revisions to the ordinance, it will be modified to reflect the requested revisions within one year upon receipt of the comments.
• ADU Tracking. The City will track and monitor its ADU production to ensure that annual production achieves the RHNA projections (3 ADUs/year). The City will begin to request information about ADU rents from applicants to better track the affordability of proposed ADUs. As a part of ADU tracking, the City will analyze geographic distribution of ADUs biennially to understand which neighborhoods are building ADUs. • ADU Fast Track Program. The City will develop a process to fast track ADU applications through plan check by moving them to the top of the queue and reducing plan check turnaround times.
• ADU Amnesty Program. To ensure safe and adequate housing, the City will develop an ADU amnesty program for existing, unpermitted ADUs to receive inspections and bring units into compliance with code and permits without risk of code enforcement action, significant fee reductions and assistance in determining necessary improvements. • Fee Waivers for Affordable ADUs. Current successor funds require an affordability covenant length of 55 years. The City will modify Zoning Ordinance Section 17.70.060 to shorten the required ADU covenant length (for example, for 5 – 15 years) pending alternate funding to offset the fee waivers for ADUs over 750 square feet that are made available to lower or moderate income households for a shorter period of time. The City will pursue funding sources, such as PLHA or in-lieu fees, funds for this effort.
Program 5. SB 9 Technical Assistance and Facilitation
The City is in the process of creating informational materials to assist applicants and property owners in submitting applications for the development of SB 9 projects, which would
highlight permit requirements and development standards to promote greater clarity in preparing submittals. Materials are anticipated to be completed in 2023. In the interim, City staff provides guidance to applicants and owners through correspondences by phone, email, and counter meetings to help applicants understand State standards and provisions under SB 9, discuss preliminary design concepts, and explain permit procedures. Additionally, the City is in the process of establishing objective design standards. Objective design standards would provide greater predictability and clarity regarding design attributes for new residential development and support ministerial review and are anticipated to be completed within two years of Housing Element adoption.
The City has recently received its first SB 9 application. In an effort to encourage and facilitate development in single family zone, the City will pursue a number of technical assistance and facilitation efforts including:
• Updating the zoning code. This will include a review of developmental standards that could constrain SB 9 development and updating the zoning code to remove such constraints.
• Creating a simplified lot split form to process SB 9 projects and provide the form online
• Ensure objective design standards for SB 9 units (Program 13) • Provide enhanced technical assistance through Program 4, which includes implementing new software to provide residents and developers with tools to determine if an ADU or SB 9 unit can be put on their property. The software will provide information regarding zoning, rebate opportunities, opportunities for fee waivers available for affordable ADU and SB 9 development, and the ADU amnesty program. The objective design standards and simplified lot form for SB 9 units will be made available through the software.
This program works in conjunction with Program 23, ADU, JADU, and SB 9 Education, which provide a variety resources and outreach to homeowners regarding SB 9.
Program 6. Incentives for Mixed-Use Developments
The City will develop incentives to encourage residential mixed-use development in areas consistent with the Three Corridors Specific Plan Land Use Plans, and in particular along portions of the San Pablo Avenue, Pinole Valley Road, and Appian Way. Specific incentives for mixed-used development include:
• A waiver of park development impact fees for deed-restricted affordable units beyond the inclusionary requirement in a development in coordination with the development of a Housing Successor’s Low and Moderate Income Housing Asset Fund Policy (Program 7).
• Prepare, update, or revise EIR as appropriate to provide CEQA clearances for projects that comply with existing zoning . The City will review and update as necessary the EIR prepared for the GP and Specific Plan so that individual projects can utilize opportunities for tiering from environmental documentation and streamlining provided under CEQA, where applicable, which can reduce duplicative analyses and
streamline environmental review. The City will begin the review within 3 years of Housing Element adoption and complete it within 6 years of adoption. • Priority development project review and processing.
Additional incentives the City shall explore include but are not limited to:
• Increased densities.
• Providing flexibility in parking requirements.
Program 7. Development of Housing Successor’s Low and Moderate Income Housing Asset Fund Policy
The City will develop a Housing Successor’s Low and Moderate Income Housing Asset Fund Policy. The policy will set priorities and goals for the use of affordable housing funds in the City as well as investigate the creation of an in-lieu fee as an alternative to the inclusionary housing requirement. The policy guide will ensure efficient and productive use of the resources. The policy guide will consider RHNA requirements, local housing needs and demographics, and fair housing objectives, among other factors. To encourage housing mobility and choice across Pinole, the City will prioritize use of limited affordable funding to create affordable housing developments and provide ownership of housing for moderate and lower-income households in higher opportunity areas of the City, including those with healthy environment, access to transportation and resources, and higher education scores, more common in eastern Pinole. The City is also including a waiver of park impact fees for affordable units beyond the inclusionary housing requirement (per Program 8).
The City will continue to require 15 percent of the units located in new residential developments of four or more to be affordable, and of those units, 40 percent must be affordable to very low income households with the construction of units off-site as an alternative. The City will pursue creation of an in-lieu fee alternative for the inclusionary housing requirement to provide flexibility for smaller projects and to create a new funding source for affordable housing projects.
Program 8. Affordable Housing Incentives
Create and adopt a set of incentives for projects that provide a minimum of 15 percent of total units affordable to low and moderate income households, and provide additional affordable housing beyond the City’s 15 percent inclusionary requirement. Specific incentives include:
• Priority and expedited review for affordable housing developments. The City will create and adopt a process for expedited and priority review which may include, for example, completion of initial review within 20 days following the intake of a new application and providing subsequent review comments back to applicants at a targeted expedited review rate 50 percent faster than the regular review process. The expedited review process would apply to projects that include affordable housing beyond the City’s inclusionary requirement and would include factors such as affordability level, location in City, and developments targeting special needs
population.
• Waiver of park impact fees for all deed-restricted affordable units in excess of the 15 percent inclusionary units requirement.
The City will continue to provide incentives for lot consolidation requests made to facilitate low-income housing through strategies that may include, but are not limited to:
• Flexibility in development standards.
• Ministerial approval of lot consolidation requests made in order to facilitate development of affordable housing.
Additional incentives the City shall investigate include but are not limited to:
• Standard planning application fee waivers based on the affordability level proposed.
Program 9. Housing for Extremely Low, Very Low, Low, and Moderate Income Households and Special Needs Households, Including Persons with Disabilities To encourage and facilitate the development of housing for lower income households, especially extremely low income households and special needs households, including housing for persons with disabilities, the City is pursuing a number of efforts identified in this program and in coordination with other programs in the Housing Element. As identified in the needs analysis of this Housing Element, special needs households with the greatest identified need in Pinole include the elderly and persons with disabilities. Specific actions and timelines to assist in the development of housing for extremely low-, very low-, low-, and moderate-income households, as well as housing for persons with special needs are as follows:
• Develop a Housing Successor’s Low and Moderate Income Housing Asset Fund Policy that prioritizes affordable housing developments for extremely-low income households, households with special needs and households with persons with disabilities. The policy guide will consider RHNA requirements, local housing needs, such as the needs of special needs households, demographics, and fair housing objectives, among other factors and will be completed within 3 years of Housing Element adoption. (see Program 7).
• Develop a fee waiver program that would provide low or no-cost building permits to age-qualified, lower income households, and qualified special needs households to make improvements to their home for universal design. The fee waiver program will help reduce costs for qualifying special needs households to improve their homes.
The City will develop a list of qualifying households and qualifying upgrades for the program. Eligible improvements may include plumbing, roofing, water damage, accessibility/mobility modifications, and improvements to make moving around inside and outside the home easier, such as stair lifts and hand rails. The Program will be completed with 18 months of Housing Element adoption. • Reduce parking standards for lower-income household developments. Zoning Ordinance amendments for will be completed within two years of Housing Element adoption.
• Contact housing service providers within Contra Costa County to determine the best
way to facilitate development of housing for extremely low-income households and special needs households, including persons with disabilities within one year of Housing Element adoption
• Based on funding availability, explore, at least once a year, development assistance for multifamily and supportive housing to meet the needs of extremely low-income households and persons with disabilities (including persons with developmental disabilities), and other special needs households.
• Implement a waiver of park impact fees for all deed-restricted affordable units in excess of the 15 percent inclusionary units requirement within two years of Housing Element adoption (see Program 8.)
• A suite of actions to encourage development of housing for seniors as outlined Program 10. Actions include reducing parking for senior housing developments, a home sharing and tenant matching program, enhanced rebate options for energy efficient home improvements, and participation in regional programs. • Annually contact developers of special needs and lower income housing to assist in development where feasible by:
o Assisting and supporting new applications.
o Providing priority processing, in coordination with Program 8. o Evaluate fee deferrals or subsidies and design modifications. o Facilitating site acquisition.
o Hosting an annual workshop for developers to provide information on the City’s regulations regarding housing development, opportunities and sites available for development, and the City’s development incentives.
Program 10. Senior Housing Incentives
The needs analysis identified a special need for the development of housing for seniors in Pinole. In response to this need, the City will develop a set of incentives to encourage the development of housing for seniors. Specific incentives include:
• Reducing parking requirements for senior housing development. • Permit fee waivers for elderly residents for adaptation and modifications of households to accommodate universal design and aging in place (per Program 9). • Enhanced rebate incentives for homeowners to make it financially feasible to undertake energy efficient and weatherization projects (per Program 19). • Promote home match shared housing programs (per Program 11), such as Front Porch’s Home Match, for homeowners to turn an available room into an opportunity to earn income, save money, age-in place, provide affordable housing and create new social connections.
• Participation in regional programs to provide assistance to seniors. Continue the partnership with the Contra Costa and Solano Food Bank to provide food resources to the community and seniors.
Additional incentives the City shall investigate include but are not limited to:
• Investigate Density Bonus beyond state law.
• Allow smaller senior units via an equivalent density unit factor that would count one senior unit as a fraction of a regular dwelling unit.
Program 12. Zoning Amendments
The City is including a number of zoning amendments as identified in the constraints section to ensure compliance with state law and remove constraints to development. Amendments to the zoning ordinance are as follows.
• Amend the Emergency Shelter ordinance to comply with AB 139 and to ensure that standards for emergency shelters are subject to the same standards as other uses in the same zone and parking requirements are based on staffing levels only. • Amend the zoning ordinance pursuant to Government Code Section 65583 to allow for Low Barrier Navigation Centers by right in areas zoned for mixed uses and nonresidential zones that permit multifamily uses.
• Amend the zoning ordinance in RMU to permit manufactured homes on permanent foundations as if they were single-family homes.
• Amend the zoning ordinance to comply with SB 9 standards (California Government Code section 65852.21).
• Review and revise standards and definitions for both group homes and residential care facilities to ensure that they are fully compliant with all appropriate state laws and that there are no constraints on group homes in the Zoning Code. This includes an amendment to allow group homes in the R zone as a permitted use by right as is allowed in all other residential zones and adding a definition of group residential to the Zoning Code.
• Review the definition of family and revise as appropriate to ensure that the definition does not require, or imply that it requires a single lease or rental agreement. • Amend the zoning ordinance to comply with state density bonus law (California Government Code section 65915). Specifically the update will increase the maximum density bonus from 35 to 50 percent, add student housing as a housing type that is eligible for density bonus incentives, reduce parking from 2 to 1.5 spaces for two and three bedroom units and from 2.5 to 2 spaces for four or more bedroom units. The City is complying with state density bonus law though the code is not yet updated. • The City will reduce the level of approval for a parking reduction or shared parking agreement from a conditional use permit to an administrative use permit, which is approved by the Zoning Administrator. The City will review the four criteria for a parking reduction to evaluate additional criteria or/and reduce the minimum number of required criteria.
• The City will further study parking requirements and reduce them so they do not post a constraint on development. Specifically, the City will do one or more of the following:
remove or reduce guest parking, remove covered parking requirements, allow tandem parking, or reduce minimum parking requirements. The City is pursuing assistance with parking evaluation and reduction through MTC-ABAG’s parking policy technical assistance.
Program 13. SB 330 Objective Design Standards and SB 35 Streamlining Compliance SB 330 enacts changes to local development policies, permitting, and processes that will be in effect through January 1, 2025. SB 330 places new criteria on the application requirements and processing times for housing developments; prevents localities from decreasing the housing capacity of any site, such as through downzoning or increasing open space requirements, if such a decrease would preclude the jurisdiction from meeting its RHNA housing targets; prevents localities from establishing non-objective standards; and requires that any proposed demolition of housing units be accompanied by a project that would replace or exceed the total number of units demolished. Additionally, any demolished units that were occupied by lower-income households must be replaced with new units affordable to households with those same income levels.
The City will ensure compliance with SB 330, by requiring any demolished units that were occupied by lower-income households to be replaced with new units affordable to households with those same income levels and establishing objective design standards.
Pursuant to SB 330, the City will review and amend the Zoning Ordinance and Design Review Guidelines to ensure that all development standards, design guidelines, and findings are objective, and promote certainty in the planning and approval process. The objective standards will also include standards for SB 9 projects. The City has begun the process and is currently cataloging existing objective and subjective standards. Through implementing objective design standards, the City is aiming to reduce the time it takes to complete the comprehensive design review process.
The City will review its approval processes to accommodate SB 35 streamlined applications and by-right applications for permanent supportive housing and navigation centers. The City will provide information regarding the SB 35 process on its website.
Program 15. Permit Streamlining
The City is including multiple efforts to expedite the permitting and review process through reducing the necessary levels of approval. This is a response to public outreach, constraints, and needs analyses.
Specifically, the City will:
• Lower the approval authority of entitlements for all Density Bonus projects from City Council to Planning Commission.
• Process lot consolidations ministerially.
• Adopt a priority permitting process for developments with affordable units beyond the inclusionary requirement (Program 8)
The City is in the process of implementing an electronic permitting application and tracking system. The online permitting process will help to expedite permitting procedures and will make permitting submittals and subsequent reviews easier for applicants, including allowing applicants to review items needed for submittals, check current project status, and digitally submit materials.
Jan 21, 2025
City of Pinole
2131 Pear Street
Pinole, CA 94564
By Email: [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected] CC: [email protected]; [email protected]; [email protected]; [email protected]
Re: Proposed amendments to the City’s Accessory Dwelling Unit and Junior Accessory Dwelling Unit Regulations
Dear Pinole City Council,
The California Housing Defense Fund (“CalHDF”) submits this letter as a public comment concerning item 10B on the agenda for the City Council meeting scheduled for January 21, 2025, an amendment to the City’s regulations for ADUs and JADUs. This proposed ordinance fails to comply with state law in several ways, and the City should address these problems before approving the ordinance.
Background
The law gives local governments authority to enact zoning ordinances that implement a variety of development standards on ADUs. (Gov. Code, § 66314.) The standards in these local ordinances are limited by state law so as not to overly restrict ADU development. (See id.) Separately from local ADU ordinances, Government Code section 66323 establishes a narrower set of ADU types that local governments have a ministerial duty to approve. “Notwithstanding Sections 66314 to 66322 ... a local agency shall ministerially approve” these types of ADUs. (Id. at subd. (a).) This means that ADUs that satisfy the minimal requirements of section 66323 must be approved regardless of any contrary provisions of the local ADU ordinance. (Ibid.) Local governments may not impose their own standards on such ADUs. (Gov. Code, § 66323, subd. (b) [“A local agency shall not impose any objective development or design standard that is not authorized by this section upon any accessory dwelling unit that meets the requirements of any of paragraphs (1) to (4), inclusive, of subdivision (a).”].) 360 Grand Ave #323, Oakland 94610
[email protected]
In addition, ADUs that qualify for the protections of Government Code section 66323, like other ADUs, must be processed by local governments within 60 days of a complete permit application submittal. (Gov. Code, § 66317, subd. (a).) State law also prohibits creating regulations on ADU development not explicitly allowed by state law. Government Code Section 66315 states, “No additional standards, other than those provided in Section 66314, shall be used or imposed, including an owner-occupant requirement, except that a local agency may require that the property may be used for rentals of terms 30 days or longer.”
Impermissible Underlying Standards
City code section 17.70.040 imposes all underlying city zoning standards on ADUs, except as modified by that section. However, as discussed supra, Government Code section 66323 mandates that the City approve a specific class of ADUs subject only to specified height and setback requirements, notwithstanding any local code requirements to the contrary. This means, for example, that the City cannot impose landscaping regulations, floor area ratio regulations, parking requirements, front setbacks, etc. on ADUs that qualify for the protections of Government Code section 66323.
Impermissible Location Regulations
City code section 17.70.040(D)(5) mandates that new detached ADUs “shall be constructed at the rear or side of an existing single-family residence, and otherwise appear secondary in nature, and not be constructed in front of the primary dwelling unit.” However, Government Code section 66323, subdivision (a) does not permit any requirement for ADUs to be located to the side or rear of the primary dwelling, if the ADUs qualify for the protections of that section of law. There are many policy reasons for this. For instance, a homeowner may prefer to preserve a private backyard space while redeveloping the less useful front yard. While children may play in the backyard, the front yard is closer to the street and less safe for a variety of activities. The City therefore must allow front yard ADUs that comply with the standards in Government Code section 66323, subdivision (a) both on single family and on multifamily properties.
HCD has issued guidance (the January 2025 HCD ADU Handbook, page 18) affirming the duty of local agencies to allow ADUs protected by Government Code section 66323 in the front setback under all circumstances.
Additionally, this is not an objective standard, as it is impossible for an applicant to know, ex ante, what a reviewing official will consider to “appear secondary in nature.” Government Code section 66314, subdivision(b)(1) permits the imposition of objective standards, and 2 of 4
Government Code section 66315 prohibits the imposition of standards beyond what is provided for in § 66314. The City may therefore not impose this non-objective standard.
Additionally, City Code section 17.70.040(D)(2)(C) imposes a requirement that “detached ADUs shall not be less than six (6) feet from the primary dwelling unit, except if this would prohibit the construction of an eight hundred (800) square foot ADU with four (4) foot rear and side setbacks.”
As discussed supra, Government Code section 66323, subdivision (a) does not permit any locational requirements for detached ADUs other than that they be four feet from side and rear property lines (if newly constructed) or have setbacks sufficient for fire and safety (if converted from existing structures). As an example, this section of law would illegally prohibit the conversion of a garage to an ADU, if that garage were less than six feet from the primary dwelling. The City therefore may not impose this six-foot requirement on ADUs protected by Government Code section 66323.
Impermissible Design Standard
City code section 17.70.040(E)(6) requires “Modifications to the exterior of the residence in order accommodate [sic] a proposed JADU shall use exterior colors, materials, and architectural details that match the appearance of existing corresponding features on the residence.” However, as discussed supra, if the JADU qualifies for the protections of Government Code section 66323, subd. (a)(1), then the city must approve it ministerially, via building permit only, and cannot impose any such design regulations, as this section of state law only permits specified height and setback regulations, as discussed supra.
Impermissible Parking Requirements
City code section 17.70.040(F) requires parking for each new ADU, less certain exceptions.
However, as discussed supra, Government Code section 66323 mandates that the City approve a specific class of ADUs subject only to specified height and setback requirements, notwithstanding any local code requirements to the contrary. This means that the City cannot subject such ADUs to parking requirements.
⧫ ⧫ ⧫
CalHDF appreciates the City’s effort to implement state law governing ADU construction.
However, the City should amend its ordinance to ensure that it complies with state law.
CalHDF is a 501(c)3 non-profit corporation whose mission includes advocating for increased access to housing for Californians at all income levels, including low-income households.
You may learn more about CalHDF at www.calhdf.org.
3 of 4
Sincerely,
Dylan Casey
CalHDF Executive Director
James M. Lloyd
CalHDF Director of Planning and Investigations
4 of 4
Attachment E. Planning Commission Staff Report and Resolutions Planning Commission – December 9, 2024
Accessory dwelling units (ADUs), junior accessory dwelling units (JADUs), and unit and lot split projects proposed under Senate Bill 9 (SB 9)
Item H.3.
https://pinoleca.portal.civicclerk.com/event/123/files/agenda/740 Planning Commission – January 27, 2025
Parking standards, affordable housing requirements, and administrative review processes.
Item G.1.
https://pinoleca.portal.civicclerk.com/event/124/files/agenda/775 Planning Commission – February 24, 2025
ADU Amnesty Program
Item G.1.
https://pinoleca.portal.civicclerk.com/event/125/files
Attachment F. Example Pre-Submittal ADU Amnesty Checklist
Page of 13 1
Building & Safety Division
Planning & Development
Amnesty Program for
Unpermitted Dwelling Units
This pre-submittal checklist is provided to you, the owner of an unpermitted dwelling unit, for selfassessment of your property. It will assist you in exploring the possibility of legalization of your unit under the Amnesty Program for Unpermitted Dwelling Units. Please complete this checklist to identify possible code issues and to assess the possibility of pursuing legalization of your unit. Once completed, you may choose to schedule a free and confidential consultation with program staff to discuss possible pathways to legalization of your unit.
Note: The City of Berkeley cannot ignore any conditions that present an immediate danger to life safety.
Applicants must be aware of this risk before submitting an Amnesty Program Application and having your unpermitted unit inspected by a City Inspector. Any fire and/or life safety violations observed during the initial Housing Inspection must be corrected within 30 calendar days. Violations determined to be an immediate danger that are not corrected may be subject to code enforcement proceedings including assessment of fees.
Your Unit’s Information
Estimated Date of Construction/Conversion: Unit Square Feet:
Zoning District: Fire Zone: 1 2 3
Types of Unpermitted Dwelling Units
Other:
Attached ADU: An attached secondary unit with independent access, permanent spaces for living and sleeping, and a complete kitchen and bathroom. This includes converted ADUs from existing garages, basements, attics or other existing habitable or non-habitable spaces.
REV: 020425
1947 Center St. 3rd Floor, Berkeley, CA 94704
(510) 981-5444 TTY 6903
[email protected]
Detached ADU: A detached secondary unit with independent access, permanent spaces for living and sleeping, and a complete kitchen and bathroom. This includes converted ADUs from existing garages or other detached accessory structures serving the primary dwelling.
Converted JADU: A JADU that is contained entirely within the floor area of a Single Family Dwelling with a separate exterior entrance. JADUs may be converted garage or attic spaces with separate sanitation facilities or may share sanitary facilities with the Single Family Dwelling.
JADUs may also have efficiency kitchens as their permanent cooking facility.
OWNER’S PRE-SUBMITTAL
QUESTIONNAIRE AND CHECKLIST
Page of 13
Construction/Conversion Date:
Pathways to Legalization:
Only unpermitted dwelling units constructed or converted prior to January 1, 2020 are eligible for participation under the Amnesty Program for Unpermitted Dwelling Units.
Applicants seeking legalization under the Amnesty Program for Unpermitted Dwelling Units may request their construction documents and plans be reviewed under the building codes that were in effect at the time when the unit was first constructed or converted by providing documentation to verify the construction or conversion date of the unpermitted dwelling unit. All documentation is subject to review and approval by program staff. California Building Standards applied to the unit are subject to review and approval at the discretion of the Building Official.
Please indicate which type/types of documentation will be used to confirm the construction/conversion date of the unit:
The City of Berkeley’s Amnesty Program for Unpermitted Dwelling Units provides 2 pathways to legalization:
See the Amnesty Program for Unpermitted Dwelling Units Program Rules for more information on pathways to legalization and compliance.
A signed/stamped letter from a licensed professional
The County Assessor’s initial date recognizing the unpermitted dwelling unit Escrow documents identifying the unit and the year of construction Prior Official Building, Planning, or Code Enforcement records of the unpermitted dwelling unit Real estate transfer disclosure forms for unpermitted dwelling unit Legalization through the standard building permit process and issuance of a Certificate of Occupancy
Legalization through issuance of a Housing Certificate of Compliance.
Path 1:
Path 2:
Eligibility Criteria Checklist
Does the number of dwelling units to be legalized exceed the allowances for the SingleFamily Dwelling maximum per lot, which is 1 ADU and 1 JADU? Y N
Was the existing unpermitted dwelling unit constructed/converted prior to January 1, 2020? Property owners will be required to provide documentation for construction/conversion date.
See Program Rules for acceptable documentation types.
Is the unpermitted dwelling unit located in an area zoned for residential use? Unpermitted dwelling units located in an area other than what is zoned for residential use are not eligible for the amnesty program.
Does the owner occupy the primary dwelling or the secondary unit if the unpermitted unit is a Junior ADU (JADU)?
2
Page of 13
If the above information is not available, then a combination of the following can be utilized to establish the construction/conversion date:
Insurance documents
Notarized letters from previous owners or tenants
Photos (if available) Dated, showing approximate time of construction Other documents will be considered on a case-by-case basis Contractor
Fill in as much information as available.
Owner
Other:
Construction
Performed
by:
Structural:
Check all
that apply
Wall Type:
Attic: Roofing:
Roof Type:
Concrete Slab
2 x 4 studs at 16” o.c.
Vented Asphalt Shingle
Metal
2 x at ” o.c. roof rafters
Raised: 2x floor joists at ” o.c.
2 x 4 studs at 24” o.c.
Not Vented Tile Flat
Unknown
Other:
Other: Other:
Other:
Construction of the Unpermitted Dwelling Unit:
Electrical
Wiring:
Check all
that apply
Is all of the existing electrical wiring serving the unpermitted dwelling unit from the original primary building?
If not, please describe the unpermitted alterations:
Y N
Plumbing
and
Mechanical
Amenities:
Check all
that apply
Are all of the fixtures and plumbing systems serving the unpermitted dwelling from the original primary building?
If not, please describe the unpermitted alterations:
Y N
2 x at ” o.c. ceiling joisters
3
Page of 13
Fire and Life Safety Criteria Questionnaire
Amnesty Program for Unpermitted Dwelling Units applicants will be required to address, at a minimum, all of the fire and life safety requirements listed below in order to be considered for legalization. If your unit does not meet one or more of these requirements, they will be considered violations. Applicants who do not address minimum life safety violations will be subject to code enforcement. Under no circumstances can a 5-year delay of code enforcement proceedings be requested for abatement of fire, life, and health safety violations. For each question, a “No” answer may indicate that a remediation, repair, or a degree of reconstruction is needed.
On the following questions, please select Yes, No or N/A (not applicable) for each question.
If N/A is not listed after a question, then you must select Yes or No.
If there is an * before the question and your answer to the question is No, then the item must be corrected before you can request a reprieve from code enforcement proceedings and continue to Certificate of Occupancy or Certificate of Compliance. A building permit may be required.
Answering “No” to questions with an ** will require the unit to be legalized through the standard building permit process (Path 1) and not through the issuance of a Housing Certificate of Compliance (Path 2).
a. ** Is the unit free of significant structural damage or defects due to deterioration, such as tilting walls or sagging roofs that present hazards? b. Is the unit free of any tripping hazards such as loose carpets, buckling and loose floor boards, delaminated floor finishing, or nails popping up? c. ** Is the ceiling height inside the unit at least 7 feet clear? a. * Are all interior walls straight and sound?
b. Are all interior walls finished with paint or with materials having protective qualities?
c. Are all interior walls free from loose plaster?
d. Do bathroom walls, including shower enclosures, have the required seal to prevent moisture intrusion into the building elements?
Plumbing - Hot and cold water piping, sanitary piping
Toilet
Lavatory - including faucets
Shower - including shower faucets,
head, and drain
Tub - including controls, spout, and drain
Clothes Washer Infrastructure
Clothes Dryer Infrastructure
Kitchen Sink
Water Heater
For the following plumbing fixtures and/or mechanical elements, please indicate which were added, altered or replaced without an approved building permit:
Structure related
Overall condition
Dishwasher
Heating System
Interior walls
Y N
Y N N/A
4
Page of 13
e. Are all interior walls free from holes allowing air or rodent intrusion? f. Are all interior walls free from visible mold?
g. Are all interior walls free of peeling paint? (See lead based paint notation) h. Does the ADU have common walls, ceilings and/or floors with the primary unit? i. * To your knowledge, is there an existing 1-hour firewall separation at all common walls and ceilings?
j. If existing, are the fire separation walls and ceiling between dwelling units free of damage, holes and leaks?
Interior walls (continued)
Y N N/A
a. * Are all exterior walls straight and sound?
b. Are all walls finished with paint or with materials having weather-resistant protective qualities on the exterior?
c. Are all wooden trims and sidings protected or have natural protective qualities? d. Are all walls free from loose stucco?
e. Are all walls free from holes or other damage allowing air or rodent intrusion? f. Are all walls free from peeling paint hazards?
g. ** If the ADU is detached from the primary dwelling or if the ADU was added to the primary dwelling increasing the ground footprint, are the ADU exterior walls within 3 feet of property lines?
h. ** Are there existing windows along the exterior walls that are located less than 36” from the property line?
i. * Does the exterior wall facing the property line have the required 1-hour fire wall separation?
j. If the ADU is detached from the primary dwelling, is the ADU less than 10 feet apart from the primary dwelling building?
k. * If less than 10 feet apart from the primary dwelling, does the ADU exterior wall facing the primary dwelling have the required 1-hour fire wall separation? Exterior walls (walls not common with the primary dwelling)
Y N N/A
a. * Are stairs accessing the unit, decks serving the unit and balconies serving the unit in good working condition? Please note ship’s ladders, alternating tread stairs or other types of elevation change components are not considered stairs. If answer is N/A skip questions b through h below and continue with Exterior Elevated Elements.
1. What is the current width of the stairs?
2. Does the measurement from the stair nosing (leading edge of the stair tread) to the ceiling directly above provide at least 6’8” headroom?
3. What is the current height of the stair risers?
4. What is the current width of the stair treads?
Stairways, Landings and Balconies
Y N N/A
5
Page of 13
b. Are all handrails and guardrails in good condition?
c. * Are all handrails and guardrails secure in their attachments? d. Do all balusters and guard openings serving stairways, decks and balconies meet the minimum approved max openings which would not allow a sphere of 4” diameter?
e. * Are all treads or steps in good condition free of tripping hazards? f. Are all structural supports of the stairways, decks and balconies in good condition?
g. Are all materials protected from weathering and damage or have natural protective features?
h. Is any point of the standing surface of the deck, balcony, and/or stair landing more than 30” above the adjacent ground level?
Stairways, Landings and Balconies (continued)
Y N N/A
a. * Is the dwelling served by any Exterior Elevated Elements such as exterior stairs, balconies or decks more than 6 feet above the adjacent ground surface as described in BMC Section 19.40.040?
Exterior Elevated Elements [E3]
Y N N/A
Interior Doors
Y N N/A
Entry Doors
a. Do all entry doors meet the following minimum required safety requirements:
1. Is the entry door in good working condition?
2. Does the entry door(s) have a locking latch keyed from the outside with the ability to unlock from the inside without the use of a key or special knowledge?
3. Does the entry door(s) have a dead bolt keyed from the outside with ability to unlock from the inside without the use of a key or special knowledge?
4. Are the hardware/hinges in good working condition and operate without difficulty?
5. Is the door frame and body in good condition without delamination, damaged or peeling paint?
6. On a door leading to and from a garage into the unit, does it have a selfclosing/latching device? Entry Doors
Doors and Windows
Y N N/A
a. Do all interior doors meet the following minimum required safety requirements:
1. Are all the interior doors in good working condition?
2. Privacy Locks – if the interior door is equipped with a privacy lock, is the locking mechanism working properly?
6
Page of 13
Interior Doors (continued)
3. Are the hardware/hinges in good working condition and operate without difficulty?
4. Is the door frame and body in good condition without delamination, damaged or peeling paint?
Y N N/A
a. Do all sliding doors meet the following ?
1. Are all the slider doors in good working condition?
2. Locks – are the locks in good operating condition?
3. Are the rollers and slides of the sliding door in good working condition and able to operate without difficulty?
4. Is the door frame and body in good condition without delamination, damaged or peeling paint?
Sliding Doors
Y N N/A
Windows
a. ** Do all sleeping rooms have an emergency egress window or an exterior door that opens to a yard or other exterior space that is accessible to the public right of way?
b. * Do the emergency egress windows serving sleeping room(s) meet the minimum clear opening requirements of 24 inches in height, 20 inches in width, and a minimum clear opening area of 5.7 square feet (5.0 square feet for ground level windows)?
Y N N/A
Safety/Tempered Glass Requirement Other Than Windows
a. Is the glass in any swinging, sliding or bifold doors tempered glass? b. Is the glass in any walls along stairways and ramps tempered glass? c. Is any glass within 24 inches of a doors edge and less than 60 inches above the walking surface tempered glass?
d. Is the exposed area of any pane of glass larger than 9 square feet, bottom edge of the glass less than 18 inches above the floor, the top edge of the glass higher than 36 inches above the floor and located less than 36” measured horizontally from a walking surface tempered glass?
e. If your property is in Fire Zone 2 or 3, do all of the windows have at least one pane of tempered glass?
f. In bathrooms, is there glass located in or within 60 inches of a tub and/or shower and within 60 inches of the walking or standing surface? g. Is any glass in wall enclosures containing bathtubs, showers saunas, steam rooms or spas tempered glass?
Y N N/A
7
Page of 13
a. ** Is the ADU located within 150 ft of the Public Right of Way curb? Fire Safety and Access:
Alarm and Fire Protection Systems
Y N N/A
Smoke Detectors
a. * Are smoke detectors installed in the following required locations:
1. In hallways or spaces outside each sleeping area, in the immediate vicinity of the bedrooms?
2. In each bedroom?
3. On every level/floor including basement?
4. Is a detector located within 3 feet of a bathroom door, forced air registers, or the tip of a ceiling fan blade? (if yes, then that detector must be moved) Carbon Monoxide
(carbon monoxide alarms are required when the dwelling has natural gas service, has a wood burning or natural gas fireplace or is directly connected to a garage or carport) a. * Does the dwelling have natural gas appliances, a wood or natural gas fireplace or is it connected to a garage or carport?
b. If the answer above is Yes, are carbon monoxide alarms installed in the following required locations:
1. On every level/floor in the immediate vicinity of each sleeping area?
2. In every sleeping room where a fuel-burning appliance is located within a bedroom or in an attached bathroom.
3. In basements?
Y N N/A
Y N N/A
a. Is an audible exterior alarm installed as required and approved by the Fire Marshal?
Y N N/A
Fire Alarm System (for properties located in Fire Zone 3 only) a. Is the unit free of any exposed electrical wiring?
b. Do all the outlets and switches have cover-plates?
c. Are the existing coverplates in good condition that are not cracked or deteriorated? Electrical
Electrical, Mechanical and Plumbing systems serving the ADU/JADU
Y N N/A
8
Page of 13
Electrical (continued)
d. Are all electrical receptacles in the following locations GFCI (ground fault circuit interrupters ) protected?
1. In the kitchen?
2. In the bathroom(s)?
3. In the basement?
4. At the exterior outlet locations?
5. In the attic?
6. In the garage?
e. Are all three-prong receptacles grounded?
f. Is the electrical service panel readily accessible and in safe operating condition? g. Does the panel have a required dead front cover allowing only the exposure of circuit breaker handles?
h. Are any open slots in the dead front cover covered with a proper device? i. Are all circuit breakers in good and operating condition? j. Are all circuit breakers labeled with proper amperage? k. Are all circuit breakers identified and labeled to their corresponding location or equipment?
l. Is there a dedicated and separate electrical shut off for the dwelling unit? m. Is all metal piping serving the unit properly bonded? The following pipes shall be properly bonded if they are metal:
i. Gas Pipe,
ii. Hot and Cold water pipes
iii. Piping adjacent to the water heater
iv. Fire Sprinkler pipes
Y N N/A
Heating and Ventilating Mechanical Systems
a. * Does the unit have its own heating system with a thermostat or is the unit connected to a heating system that is capable of maintaining a minimum of 68 degrees Fahrenheit within any and all portions of the unit? b. Does the unit have a thermostat in good working condition? (Exceptions: For units that do not have a thermostat or controlling devices, the temperature inside the habitable spaces shall be maintained at 68 degrees Fahrenheit)
c. Do all supply and return air vents have a vent cover?
Y N N/A
9
Page of 13
d. Does the bathroom(s) have an exhaust fan in good working condition? (Exceptions: In dwelling units built/converted prior to 2010, bathrooms with an operable window are not required to have an exhaust fan) e. Does the Kitchen have an exhaust fan in good working condition? f. Are the connections of the ducts free of screws? Yes No N/A (In other words, no screws are used to connect sections of duct together)
g. Are the exhaust ducts equipped with an approved termination with a damper in good working order?
h. Is the kitchen exhaust duct a smooth-wall type (not corrugated or flex-type)? Heating and Ventilating Mechanical Systems (continued)
Y N N/A
a. Are the built-in appliances such as ranges, ovens, refrigerators, etc in good operating condition with no missing knobs and handles?
Y N N/A
N/A
a. * Overall, is the sanitary system in good working order? b. Is all sanitary drainage piping free from leaks and properly installed? c. Does the sanitary drainage piping have the correct minimum slope of ¼ inch per foot towards the public sewer main?
d. Are there proper clean-outs installed at the following required locations:
1. Within 24 inches from exterior of building?
2. At every straight run of pipe exceeding 100 feet?
3. Is there a cleanout at each aggregate horizontal change in direction exceeding 135 degrees?
Sanitary System
Y N N/A
Built-In Appliances
Plumbing System
a. Is all existing water piping free from leaks?
Y N
Piping
Cold Water System
a. Are all plumbing fixtures able to deliver adequate amount of cold water? Y N
a. Are all plumbing fixtures required to deliver hot water able to deliver adequate amount of hot water with a minimum temperature of 110 degrees? Y N
Hot Water System
N/A
10
Page of 13
Plumbing Fixtures
a. Are the toilets in good working order?
b. Are the toilet anchor screws tight?
c. Does the toilet’s flush valve completely shut off the flow of water into the tank? d. Are the bathroom lavatory(s) in good working order, free of leaks and rust? e. Are the lavatory faucets free of leaks and the valves and handles in good working order?
f. Is the lavatory properly set, caulked and sealed at the countertop to prevent water intrusion into walls and/or cabinets below?
g. Are bathtub and/or shower faucets and handles in good working order free of leaks and rust?
h. Is the kitchen sink in good working order, free of leaks and rust? i. Is the kitchen sink faucet free of leaks and the valves and handles in good working order?
j. Is the kitchen sink properly set, caulked and sealed at the countertop to prevent water intrusion into walls and/or cabinets below?
Y N N/A
Water Heater
a. * Is there a dedicated water heater serving the dwelling unit? b. What type of water heater is it? I.e. gas, electric, tank, tankless, heat pump, etc. c. To your knowledge, when was current water heater installed? d. If the water heater is a tank type water heater, does the water heater have state approved seismic straps installed?
1. If seismic straps are installed, is there a strap installed on the upper and lower 1/3 of the water heater and a minimum of 4” above the water heater controls?
e. Is there a drain pan under the water heater with the drain piping daylighting to the outside of the unit or garage? (A drain pan is required where damaged can occur in the event of a leak or malfunction. An Overflow Sensor may be installed in lieu of the drain piping.)
f. Is there a temperature/pressure relief valve (TPRV) for the water heater? g. Does the drainage piping from the TPRV terminate outside the unit or garage between 6 and 24 inches from grade? (Please note: The termination cannot be threaded or capped.)
Y N N/A
11
Page of 13
Any additional information regarding the unpermitted dwelling unit you may want to provide? Once you have completed this checklist, assess whether you want to proceed. You may contact our offices for an additional confidential meeting to discuss what you have assessed and to answer any questions you may have. If you decide not to continue, please be aware of the fire and life safety issues you have discovered and it is our hope that you address these items in the near future for the safety of the occupants of the unpermitted dwelling unit. As the property owner, it is your responsibility to ensure your property meets habitability standards adopted by the City of Berkeley. By completing this form and contacting our offices in regards to your findings of unpermitted conditions you agree to defend, indemnify and hold harmless the City of Berkeley and it’s officers and employees from any and all claims arising from discovery of safety violations.
e. Regarding the Water Heater Venting:
1. Is the Water Heater properly vented?
2. Is the venting properly secured and fastened in place?
3. Is any horizontal vent pipe sloping upwards with a minimum of ¼ inch per foot?
4. Is there a minimum of three screws connecting the vent flue to the vent hood?
5. Does the vent terminate properly above the roof? (24 inches above any object within 10 feet horizontally.)
Water Heater (continued)
Y N N/A
12
Page of 13
Fire Separation Wall Construction Assemblies
For examples of fire separation wall construction assemblies, see the GA-600 Fire Resistance and Sound Control Design Manual.
• For 1-hour exterior walls see GA File No. WP 8105.
• For 1-hour interior walls see GA File No. WP 3242, GA File No. WP 3243, GA File No. WP 3244, GA File No. WP 3245, GA File No. WP 3430, GA File No. WP 3510, Ga File No. WP 3520, FA File No. WP 3605, or GA File No. WP 3614.
• For 1-hour ceiling assemblies see GA File No. FC 5241, GA File No. FC 5242, GA File No. FC 5250, GA File No. FC 5300, GA File No. FC 5410, GA File No. FC 5420, or GA File No. FC 5503.
A hard copy of the GA-600 Fire Resistance and Sound Control Design Manual is available for reference at the City of Berkeley Permit Service Center.
Path 1: Certificate of Occupancy - Site Plan Requirements For applicants seeking the full legalization of an unpermitted dwelling unit, a building permit and construction documents must be submitted. Site plans, floor plans and other drawings are required during the permit process, as if the project were new construction. After a permit is issued, an approved final inspection is required to obtain a Certificate of Occupancy and to fully legalize the unit.
It is recommended that you retain an experienced consultant to draft plans for your unpermitted unit.
The consultant does not have to be a licensed professional as long as the structure is not structurally unusual. The plans must include the following drawings at a minimum:
1. Site Plan
2. Existing floor plan before the unpermitted unit was constructed if the unit is attached or converted.
3. New floor plan with the unpermitted unit addition, including electrical, plumbing, and mechanical systems in the same floor plan drawing or as a separate plan.
4. Reflected Ceiling Plan
5. Roof Plan
6. Building Section(s)
7. Building Elevations
8. Window and door schedules
9. Building details such as an eave details, wall details, floor details, etc.
10.Structural notes and specifications
11. Foundation Plan
12.Floor Framing Plan
13.Ceiling-Roof Framing Plan
14.Structural Details
15.Structural Calculations (by a licensed professional)
16.Setback dimensions to property lines and/or other structures on the same property. 13
CITY COUNCIL
REPORT 12.A.
DATE: MARCH 4, 2025
TO: MAYOR AND COUNCIL MEMBERS
FROM: Markisha Guillory, Finance Director, 510-724-9823, [email protected] SUBJECT: FY 2024/25 MID-YEAR BUDGET REVIEW (SECOND QUARTER FINANCIAL
REPORT)
RECOMMENDATION
Staff recommends that the City Council receive the Fiscal Year (FY) 2024/25 Second Quarter Financial Report.
BACKGROUND
The quarterly financial report is intended to provide the City Council, City staff and management, and the community a general update on the financial activities and condition of the City.
The City operates on an annual budget cycle. Through the budget, the City Council approves revenue estimates and authorizes City staff to expend the City’s limited financial resources. As one of the many activities that the City undertakes to help ensure its financial soundness, staff provides quarterly financial reports on the City’s budget condition.
The Second Quarter Financial Report (Attachments A and B) covers financial activity through the second quarter of FY 2024/25, ending December 31, 2024. It provides preliminary yearend results.
REVIEW AND ANALYSIS
At its meeting on June 25, 2024, the City Council adopted the FY 2024/25 Operating and Capital Budget. The FY 2024/25 budget is a status quo budget, meaning that the revenue sources and service and staffing levels included in the budget are similar to those included in the prior year’s budget. The City remains in a stable financial position and is able to fund its operating and capital expenditures through annual, recurring funding sources. The budget does include the use of unassigned fund balance (residual, unrestricted funds) primarily for several one-time, Council-directed initiatives, which is an acceptable use of unrestricted funds.
An important part of managing the City’s budget performance is through the mid-year budget review which includes a projection through the end of the fiscal year. The mid-year budget, excluding any one-time adjustments, serves as the baseline budget for the subsequent fiscal year and for the long-term financial forecast. The mid-year budget review involves a detailed analysis of budget-to-actuals from July 1 to December 31 and helps us determine if adjustments to anticipated revenue and planned expenditures are necessary. At the mid-point
of the fiscal year most revenues and expenditures are expected to be at 50% of budget, although this may vary based on the timing of certain receipts and spending trends.
Overall, revenues and expenditures are mostly on target with budgeted amounts as expected at this point in the fiscal year. However, staff is recommending several revenue and expenditure adjustments to better align some areas of the budget with current projections and operating needs. The Second Quarter (Mid-Year) Financial Report (Attachment A) outlines this information.
The FY 2024/25 budget and actual revenue, expenditures, and estimated beginning and ending fund balance for each City fund is listed in the Financial Summary (Attachment B).
FISCAL IMPACT
The fiscal impact of the proposed budget adjustments is as follows:
Total Proposed
Adjustments
(Increase/(Decrease)
General Fund (Fund 100)
Revenues $ (93,319)
Expenditures (261,840)
Measure S 2006 Fund (Fund 105)
Revenues (31,000)
Measure S 2014 Fund (Fund 106)
Revenues (31,000)
Expenditures 150,000
Measure I 2024 Fund (Fund 107)
Revenues 600,000
Equipment Reserve Fund (Fund 160)
Expenditures 92,891
Recreation Fund (Fund 209)
Revenues 177,050
Expenditures 231,050
Building and Planning Fund (Fund 212)
Revenues (34,500)
Expenditures (76,400)
Growth Impact Fund (Fund 276)
Revenues (1,039,594)
Cable Access TV Fund (Fund 505)
Expenditures (85,000)
Information Systems Fund (Fund 525)
Indirect Cost Allocations (34,230)
Expenditures $ (34,230)
ATTACHMENTS
A. FY 2024-25 Q2 Financial Report
B. FY 2024-25 Q2 Financial Summary by Fund
C. Resolution - FY 2024-25 Mid-Year Budget Adjustments
0 City of
Pinole
Prepared by Finance Department
March 4, 2025
FY 2024/25 Second Quarter
(Mid-Year) Financial Report
0 This page intentionally blank
FY 2024/25 Second Quarter Financial Report
Table of Contents
1 Table of Contents
Introduction.................................................................................................................................3 General Fund Overview ................................................................................................................4 General Fund Revenue.................................................................................................................6 Sales Tax ..............................................................................................................................7 Property Tax..........................................................................................................................9 Utility Users’ Tax .................................................................................................................10 Intergovernmental Tax.........................................................................................................11 Franchise Tax......................................................................................................................12 Transient Occupancy Tax (TOT) ...........................................................................................13 Business License Tax ..........................................................................................................14 Public Safety Charges .........................................................................................................15 Other Revenue....................................................................................................................16 Transfers In.........................................................................................................................16 General Fund Expenditures ........................................................................................................17 Salaries and Wages.............................................................................................................19 Employee Benefits ..............................................................................................................20 Professional and Administrative Services.............................................................................21 Other Operating Expenses...................................................................................................22 Materials and Supplies........................................................................................................22 Interdepartmental Charges .................................................................................................22 Asset/Capital Outlay...........................................................................................................22 Debt Service .......................................................................................................................22 Transfers Out......................................................................................................................22 Non-General Funds....................................................................................................................23 Special Revenue Funds ..........................................................................................................23 Gas Tax Fund (Fund 200) .....................................................................................................23 Public Safety Augmentation Fund (Fund 203) .......................................................................23 Supplemental Law Enforcement Services Fund (Fund 206)...................................................24 NPDES Storm Water Fund (Fund 207) ..................................................................................24 Recreation Fund (Fund 209) ................................................................................................24 Building and Planning Fund (Fund 212) ................................................................................25 Refuse Management Fund (Fund 213)..................................................................................25
FY 2024/25 Second Quarter Financial Report
Table of Contents
2 Solid Waste Fund (Fund 214)...............................................................................................26 Measure J Fund (Fund 215)..................................................................................................26 Development Growth Impact Fund (Fund 276) .....................................................................27 Housing Assets for Resale Fund (Fund 285)..........................................................................27 Lighting and Landscape District Fund (Fund 310) .................................................................27 Capital Project Funds .............................................................................................................28 City Street Improvement Fund (Fund 325)............................................................................28 Arterial Streets Rehabilitation Fund (Fund 377) ....................................................................28 Enterprise Funds ....................................................................................................................28 Sewer Enterprise Fund (Fund 500) .......................................................................................28 Cable Access TV Fund (Fund 505)........................................................................................29 Information Systems Fund (Fund 525)..................................................................................29 Financial Summary by Fund .......................................................................................................30
FY 2024/25 Second Quarter Financial Report
Introduction
3 Introduction
The quarterly financial report is intended to provide the City Council, City staff and management, and the community a general update on the financial activities and condition of the City.
The City operates on an annual budget cycle. Through the budget, the City Council approves revenue estimates and authorizes City staff to expend the City’s limited financial resources.
As one of the many activities that the City undertakes to help ensure its financial soundness, staff provides quarterly financial reports on the City’s budget condition.
The First Quarter Financial Report covers financial activity through the first quarter of the FY 2024/25, July 1, 2024 through December 31, 2024. It also provides projected year-end results.
The City’s full budget document, FY 2024/25 Operating and Capital Budget, and other financial reports, can be found on the City’s website at https://www.pinole.gov/financialreports/.
FY 2024/25 Second Quarter Financial Report
General Fund Overview
4 General Fund Overview
The FY 2024/25 budget is a status quo budget, meaning that the revenue sources and service and staffing levels included in the budget are similar to those included in the prior year’s budget. The City remains in a stable financial position and is able to fund its operating and capital expenditures through annual, recurring funding sources. The budget does include the use of unassigned fund balance (residual, unrestricted funds) primarily for several onetime, Council-directed initiatives, which is an acceptable use of unrestricted funds.
Additionally, the City maintains a separate General Reserve Fund, which is required by the City’s Cash Reserve Policy to maintain a reserve balance equal to 50% of total on-going General Fund expenditures. To close the budget gap for FY 2024/25, the City Council approved a one-time transfer of $843,790 from the General Reserve to balance the budget.
The General Reserve fund balance will be approximately $9.7 million after the transfer is processed, which is approximately 42% of total on-going General Fund expenditures.
At its meeting on June 25, 2024, the City Council adopted the FY 2024/25 budget, which included the use of the General Fund’s unassigned fund balance to fund several Councildirected initiatives as well as several capital improvement projects. The FY 2024/25 adopted budget includes the use of General Fund (including Measure S 2006 and 2014) unassigned fund balance for a net deficit of $9 million.
The majority of the use of fund balance is for several large, multi-year capital improvement projects. It is important to note that the total estimated costs of capital projects are budgeted in year one (FY 2024/25) of the Capital Improvement Plan (CIP) although some projects may take several years to complete. The total costs are budgeted up front to earmark the full amount of funding needed to complete the CIP projects. An itemized list of the capital projects funded by the General Fund unassigned fund balance can be found on page 7 of the FY 2024/25 Operating and Capital Budget: https://www.pinole.gov/wpcontent/uploads/2024/08/Budget-for-FY2024-2025.pdf.
The City is projecting to end FY 2024/25 with a net deficit of $9 million, with total revenues projected at $28.7 million and expenditures at $33.9 million, and an estimated ending fund balance of $2.4 million, if all one-time initiatives and capital projects were to be completed within FY 2024/25. The table below summarizes the General Fund budget to actuals through the second quarter.
General Fund (including
Measure S 2006 and 2014)
FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of
Amended
Budget
Projected
Year-End
Revenues $ 28,219,433 $ 28,219,433 $ 444,681 $ 28,664,114 $ 11,558,900 40% $ 28,664,114 Expenditures 37,215,683 37,282,733 (121,840) 37,160,893 16,100,945 43% 34,280,893 Net surplus/deficit (8,996,250) (9,063,300) 566,521 (8,496,779) $ (4,542,044) (5,616,779) Beginning Fund Balance 7,978,729 7,978,729 7,978,729 7,978,729 Ending Fund Balance $ (1,017,521) $ (1,084,571) $ (518,050) $ 2,361,950 Page 282 of 320 FY 2024/25 Second Quarter Financial Report
General Fund Overview
5 Since the second quarter represents 50% of the fiscal year, it is expected that actual revenues and actual expenditures will be around 50% of budget. However, this may vary depending on the timing of certain receipts (e.g., property tax) and disbursements (e.g., debt payments).
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
6 General Fund Revenue
The City Council authorized revenues in the amount of $28,219,433 in the original FY 2024/25 General Fund budget, including Measure S 2006 and 2014. General Fund actual revenues through the second quarter of FY 2024/25 totaled $11,558,900, which is 40% of the budget. This is consistent with actual revenue received in the second quarter of prior fiscal years. The table below summarizes General Fund revenue activity through the second quarter.
Although actuals are mostly in line with budget, staff is recommending several adjustments, as outlined in the table above, resulting in a net increase of $444,681 in the Geneal Fund revenue budget. See the Second Quarter Financial Summary by Fund on page 30 for detailed explanations of the proposed budget adjustments.
The following section describes each revenue category and provides historical trend information as well as financial activity for the second quarter of FY 2024/25.
Category FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals
% of Amended
Budget
Projected
Year-End
Property Taxes $ 6,168,067 $ 6,168,067 $ - $ 6,168,067 $ 3,267,490 53% $ 6,168,067 Sales and Use Taxes 4,536,436 4,536,436 (77,280) 4,459,156 1,657,166 37% 4,459,156 Sales and Use Taxes - Measure S 2006 2,581,000 2,581,000 (31,000) 2,550,000 969,991 38% 2,550,000 Sales and Use Taxes - Measure S 2014 2,581,000 2,581,000 (31,000) 2,550,000 963,511 38% 2,550,000 Sales and Use Taxes - Measure I 2024 - - 600,000 600,000 - 0% 600,000 Utility Users Tax 2,285,000 2,285,000 - 2,285,000 1,282,245 56% 2,285,000 Franchise Taxes 850,000 850,000 - 850,000 336,185 40% 850,000 Other Taxes: TOT 460,000 460,000 (60,000) 400,000 159,558 40% 400,000 Other Taxes: Business License 464,599 464,599 - 464,599 164,343 35% 464,599 Intergovernmental Taxes 2,402,673 2,402,673 - 2,402,673 1,187,655 49% 2,402,673 Public Safety Charges 1,774,307 1,774,307 - 1,774,307 1,045,496 59% 1,774,307 Total Other Revenue 847,561 847,561 43,961 891,522 525,260 59% 891,522 Revenue Total: 24,950,643 24,950,643 444,681 25,395,324 11,558,900 46% 25,395,324 Transfer In from Section 115 Trust 2,425,000 2,425,000 2,425,000 - 0% 2,425,000 Transfer In from General Reserve 843,790 843,790 843,790 - 0% 843,790 Revenue/Sources Total: $ 28,219,433 $ 28,219,433 $ 444,681 $ 28,664,114 $ 11,558,900 40% $ 28,664,114 Page 284 of 320 FY 2024/25 Second Quarter Financial Report
General Fund Revenue
7 Sales Tax
Sales tax is the City’s largest general revenue stream at 34% of total General Fund revenues.
Through the second quarter, sales tax revenue collected through November, was $3,590,669, 38% of the budget. There is a typically a two-month delay in the timing of sales tax receipts. The receipts are consistent with revenue received for the same time period in previous fiscal years.
City staff meets with the sales tax consultant, HdL, quarterly to get updates on the previous quarter’s sales tax performance. Highlights from the last quarterly sales tax update for the period July through September 2024 were:
• Overall sales tax receipts were down 0.7% compared to the same period in 2023; • A relatively new business in town boosted general consumer goods revenues, offsetting decreases in other sectors such as electronics/appliances and specialty stores;
• The City’s allocation from the countywide use tax pool jumped 2.3% as the City’s pool share increased;
• Casual dining revenues were lower, but partially offset by growth in quick-service and fast-casual restaurants;
• The price of crude oil fell during the period and directly affected fuel-service station receipts—with revenues falling 19%.
HdL provided updated sales tax projections for FY 2024/25. We expect to receive $139,280 less than originally budgeted. Therefore, staff is recommending an adjustment to reduce the revenue budget by $139,280 (General Fund and the Measure Ss). However, the reduction will be partially offset by an additional $600,000 that we expect to receive from new local sales tax (Measure I), which was passed by voters in the November 2024 election. The $600,000 represents one quarter of the new revenue sinceMeasure I goes into effect on April 1, 2025. The net increase to the sales tax revenue budget is $460,720.
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
8 FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Amended
Budget
Total 8,928,361 9,613,625 9,328,351 9,430,219 3,590,669 10,159,156 Q4 2,427,536 2,322,856 2,307,279 2,425,993
Q3 2,006,633 2,428,400 2,387,064 2,360,669
Q2 2,272,917 2,502,822 2,341,406 2,338,691 1,455,878
Q1 2,221,275 2,359,547 2,292,602 2,304,865 2,134,791
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
9 Property Tax
Property tax is the City’s second largest revenue stream at 22% of total General Fund revenues. It is comprised of four segments – secured, unsecured, supplemental, and transfer tax. The largest segment is secured property tax. It is received in three installments in December (55%), April (40%), and June of each year (5%). Secured property tax revenue includes the basic 1% property tax and the Redevelopment Property Tax Trust Fund (RPTTF).
This is revenue that has resulted from the dissolution of the former Pinole Redevelopment Agency and represents the shift from the Agency receiving tax increment revenue to the various taxing entities receiving the tax revenue. The RPTTF revenue will convert to “normal” property tax revenue this fiscal year as all of the former Agency’s outstanding debt is paid off and the Successor Agency is formally dissolved.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Budget
Total 4,091,345 4,307,208 5,055,790 5,948,810 3,267,489 6,168,067 Q4 1,371,016 1,492,871 2,060,252 2,816,214
Q3 1,176,332 1,221,885 1,311,320 1,351,164
Q2 1,520,406 1,564,444 1,670,279 1,765,376 3,212,512
Q1 23,591 28,007 13,939 16,056 54,977
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
10 Utility Users’ Tax
Utility Users’ Tax (UUT) of 8% is levied on telecommunication, electricity, gas, and mobile telephones. Through the second quarter, UUT revenue collected was $1,282,245, 56% of the budget. The amount collected is consistent with the timing of receipts.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Budget
Total 1,938,422 2,063,773 2,312,830 2,445,715 1,282,245 2,285,000 Q4 442,236 471,356 572,657 581,069
Q3 556,691 622,765 699,442 714,965
Q2 491,940 493,892 520,972 596,338 637,672
Q1 447,554 475,760 519,759 553,343 644,573
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
11 Intergovernmental Tax
Intergovernmental Tax is comprised of the Motor Vehicle License Fee (VLF), which is the City’s share of motor vehicle license fees levied, collected, and apportioned by the State.
This category also includes the Homeowners Property Tax Relief, which is a reimbursement from the State to offset loss of property tax for the state-imposed homeowner exemption.
Through the second quarter, the first half of the allocation was received in the amount of $1,187,655. The second half will be received in June.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Budget
Total 2,004,884 2,079,739 2,219,137 2,319,153 1,187,655 2,402,673 Q4 995,289 1,028,682 1,099,865 1,147,883
Q3 14,306 22,376 19,408 23,388
Q2 995,289 1,028,682 1,099,865 1,147,883 1,187,655
Q1 - - - - -
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
12 Franchise Tax
Franchise Tax is levied on gas (1%), electricity (2%), cable (5%), and refuse (10%). Through the second quarter, revenue collected was $336,185, 40% of the budget. The amount collected is consistent with the timing of receipts.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Budget
Total 751,598 788,146 813,494 901,208 336,185 850,000
Q4 145,103 332,661 322,641 402,957
Q3 150,062 157,804 165,387 167,826
Q2 308,525 149,190 162,326 167,133 169,109
Q1 147,908 148,492 163,140 163,292 167,075
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
$900,000
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
13 Transient Occupancy Tax (TOT)
Transient Occupancy Tax (TOT), also known as the “hotel tax,” is levied at 10% on persons staying 30 days or less in a motel or lodging facility within City limits. Through the second quarter, revenue collected was 159,558, 40% of the amended budget. Due to the downward trend in short-term lodging in the City, staff is recommending an adjustment to reduce the revenue budget by $60,000.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Amended
Budget
Total 446,105 487,687 456,288 401,499 159,558 400,000
Q4 122,023 130,974 114,768 105,338
Q3 96,052 105,958 101,466 96,822
Q2 107,042 114,050 106,897 87,439 64,364
Q1 120,989 136,705 133,158 111,900 95,194
$-
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
14 Business License Tax
Business License Tax is assessed on all businesses doing business within City limits.
Through the second quarter, revenue collected was $164,343, 35% of the budget. The bulk of this revenue is typically received in December and January during the annual business license renewal.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Budget
Total 349,733 441,779 438,329 464,672 164,343 460,000
Q4 9,878 38,852 42,421 34,119
Q3 201,190 223,061 287,509 263,646
Q2 127,710 135,421 86,522 145,533 141,476
Q1 10,956 44,445 21,876 21,374 22,867
$-
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
15 Public Safety Charges
Public safety charges are received for dispatch services provided to the cities of Hercules and San Pablo under an Intergovernmental Service Sharing agreement. The revenue is received on a quarterly basis. Through the second quarter, $1,045,496, or 59% of the budget, was collected.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Budget
Total 1,316,878 1,447,934 1,568,849 1,803,884 1,045,496 1,743,807 Q4 337,192 353,105 368,748 415,192
Q3 326,562 353,105 368,748 415,192
Q2 326,562 353,105 368,748 415,192 457,486
Q1 326,562 388,620 462,606 558,308 588,009
$-
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
$1,800,000
FY 2024/25 Second Quarter Financial Report
General Fund Revenue
16 Other Revenue
Other revenue includes permits, fees, fines and forfeitures, rental income, proceeds from the sale of property, investment income, and grants. All revenues in this category totaled $525,260, 59% of the budget. Some revenue sources within this category are trending significantly higher than originally budgeted; therefore, staff is recommending adjustments to increase the grants and fines and forfeitures revenue budgets totaling $43,961.
Transfers In
The transfer in comes from the Section 115 Trust to offset the increase in pension costs in the General Fund. For FY 2024/25, $2,425,000 is budgeted, but the actual amount of the transfer will be based on total expenditures at year-end.
Also, the City Council approved a one-time transfer of $843,790 to the General Fund from the General Reserve to balance the budget for FY 2024/25. The transfer will be made later in the fiscal year.
FY 2024/25 Second Quarter Financial Report
General Fund Expenditures
17 General Fund Expenditures
The City Council authorized expenditures in the amount of $37,215,683 in the original FY 2024/25 General Fund budget. During the first quarter the General Fund expenditures budget was revised to $37,282,733. General Fund actual expenditures plus encumbrances through the second quarter of totaled $16,100,945, 43% of the amended budget. The tables below summarize General Fund expenditure activity through the second quarter.
Actual expenditures in most departments were at or below 50%. Those that were above 50% are discussed below.
• Several departments, including City Treasurer, Finance, and Human Resources were slightly over 50% due to the workers compensation and general liability annual premiums being paid in full at the beginning of the fiscal year. • City Attorney expenditures were at 52% of budget due the time lag in reimbursements (credits) from other City departments for legal services. Reimbursements are processed in the month following the end of each quarter. • Non-Departmental expenditures were at 90% due to the annual debt payment for 2006 pension obligation bonds which was paid in full at the beginning of the fiscal year, operating subsidies being transferred to Recreation and PCTV, and contributions to the Equipment Replacement Fund, and the City Street Improvement and Arterial Streets Rehabilitation Funds.
Department FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of
Amended
Budget
Projected YearEnd
City Council $ 202,339 $ 202,339 $ - $ 202,339 $ 67,037 33% $ 202,339 City Manager 683,857 683,857 - 683,857 273,010 40% 683,857 City Clerk 717,294 717,294 13,930 731,224 338,058 46% 731,224 City Treasurer 10,148 10,148 - 10,148 5,167 51% 10,148
City Attorney 297,031 297,031 - 297,031 154,856 52% 297,031 Finance Department 971,117 971,117 3,000 974,117 526,305 54% 974,117 Human Resources 888,867 888,867 - 888,867 452,836 51% 888,867 Non-Departmental 3,257,051 3,257,051 - 3,257,051 2,930,034 90% 3,257,051 Police Department 12,358,037 12,358,037 19,230 12,377,267 6,070,778 49% 12,377,267 Fire Department 6,433,461 6,433,461 - 6,433,461 3,037,077 47% 6,433,461 Public Works 10,368,528 10,368,528 (95,500) 10,273,028 1,841,783 18% 7,393,028 Community Development 585,788 652,838 (52,500) 600,338 266,694 44% 600,338 Community Services 442,165 442,165 - 442,165 137,311 31% 442,165 Expenditure Total: $ 37,215,683 $ 37,282,733 $ (111,840) $ 37,170,893 $ 16,100,945 43% $ 34,290,893 Page 295 of 320 FY 2024/25 Second Quarter Financial Report
General Fund Expenditures
18 Actuals in most of the expenditure categories were at or below 50%. Those that were above 50% are discussed below.
• Benefits were at 54% of budget primarily due to the workers’ compensation annual premium being paid in full at the beginning of the fiscal year. • Other operating, mostly comprised of utilities, was at 57% but fluctuates throughout the fiscal year.
• Debt service was at 100% due to the annual payment being paid in full at the beginning of the fiscal year.
Although actuals are mostly in line with budget, staff is recommending several adjustments, as outlined in the tables above, resulting in a net savings of $111,840 in the Geneal Fund expenditure budget. See the Second Quarter Financial Summary by Fund on page 30 for detailed explanations of the proposed budget adjustments.
The following section describes each expenditure category and provides historical trend information as well as financial activity through the second quarter of FY 2024/25.
Category FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals
w/ Encumb.
% of
Amended
Budget
Projected
Year-End
Salaries & Wages $ 10,343,285 $ 10,343,285 $ 10,343,285 $ 4,805,374 46% $ 10,343,285 Benefits 7,399,988 7,399,988 7,399,988 3,972,929 54% $ 7,399,988 Professional/Admin Services 9,482,105 9,549,155 108,930 9,658,085 4,385,302 45% $ 9,658,085 Other Operating 322,711 322,711 322,711 184,985 57% $ 322,711 Materials and Supplies 185,033 185,033 185,033 55,944 30% $ 185,033 Interdepartmental Charges (719,548) (719,548) 29,230 (690,318) 239,916 -35% $ (690,318) Asset/Capital Outlay 8,004,702 8,004,702 (250,000) 7,754,702 439,302 6% $ 4,874,702 Debt Service 636,107 636,107 636,107 636,015 100% $ 636,107 Transfers Out 1,561,300 1,561,300 1,561,300 1,381,177 88% $ 1,561,300 Expenditure Total: $ 37,215,683 $ 37,282,733 $ (111,840) $ 37,170,893 $ 16,100,945 43% $ 34,290,893 Page 296 of 320 FY 2024/25 Second Quarter Financial Report
General Fund Expenditures
19 Salaries and Wages
The FY 2024/25 budget includes salaries and wages based on the City’s staffing level of 113.14 full-time equivalents (FTEs), salary increases for different classifications already agreed upon in the City’s current labor memorandums of understanding (MOUs). The budget includes a savings factor equal to 3% of total annual salary and benefits expenditures to account for savings resulting from position vacancies. Through the second quarter, salaries and wages were $4,805,374, 46% of budget.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Budget
Total 9,687,549 10,550,396 11,006,433 10,113,758 4,805,374 10,343,285 Q4 2,912,795 3,282,972 2,534,186 2,609,792
Q3 2,242,815 2,405,510 3,025,957 2,772,505
Q2 2,577,121 2,814,371 2,822,048 2,405,708 2,341,722
Q1 1,954,817 2,047,542 2,624,243 2,325,753 2,463,651
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
FY 2024/25 Second Quarter Financial Report
General Fund Expenditures
20 Employee Benefits
The cost of retirement benefits is the City’s annual required contribution for employees’ pension to the California Public Employees’ Retirement System (CalPERS). The City’s annual required contribution is determined by an annual actuarial valuation report, the most recent of which is as of July 2023. The budget reflects the net cost to the City (the required total contribution minus the employee contributions). All classic employees currently contribute the required employee contribution plus a portion of the employer’s contribution for a total of 15%.
Other benefits include employee medical/dental/vision care, workers’ compensation, and others. The benefits cost in the forecast is based primarily trends and information provided by service providers. Through the second quarter, benefits were $3,972,929, 54% of the budget. As previously stated, the overage is primarily attributable to the workers’ compensation and general liability annual premiums being paid in full at the beginning of the fiscal year.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Budget
Total 5,492,537 6,030,608 6,884,786 6,843,938 3,972,929 7,399,988 Q4 1,393,224 1,493,949 1,556,478 1,583,218
Q3 1,289,356 1,386,804 1,643,164 1,616,513
Q2 1,273,509 1,850,799 1,856,854 1,796,869 1,678,685
Q1 1,536,448 1,299,057 1,828,289 1,847,339 2,294,244
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
FY 2024/25 Second Quarter Financial Report
General Fund Expenditures
21 Professional and Administrative Services
Professional and administrative services include consulting services, legal services, temporary services, network and software maintenance, and equipment and building maintenance. Contract services with other government agencies, such as the County animal services and library services, are also included in professional services. This category is primarily projected based on contractual obligations and historical trends.
Through the second quarter, professional and administrative services were $3,995,393, 41% of the budget.
This category also includes the City’s fire services agreement with the Contra Costa County Fire Protection District (CCCFPD) to provide fire protection services to Pinole residents. For FY 2024/25, the cost is $5.7 million per the approved five-year agreement. The monthly contract costs are included in the actuals shown below.
Staff is recommending adjustments to increase the professional services category by $108,930 primarily for consulting services.
FY 2020/21
Actual
FY 2021/22
Actual
FY 2022/23
Actual
FY 2023/24
Actual
FY 2024/25
YTD Actual
FY 2024/25
Amended
Budget
Total 3,120,915 4,083,329 5,686,937 9,049,450 3,995,393 9,658,085 Q4 1,375,657 2,003,524 2,861,758 2,927,276
Q3 599,961 825,459 1,236,020 2,050,634
Q2 683,627 785,639 867,167 2,116,252 2,065,092
Q1 461,671 468,707 721,992 1,955,288 1,930,301
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
FY 2024/25 Second Quarter Financial Report
General Fund Expenditures
22 Other Operating Expenses
Other operating expenses include all other expenditure categories, such as travel/training, office expenses, and utilities. Through the second quarter, expenditures including encumbrances were $184,985, 57% of the budget.
Materials and Supplies
Materials and supplies include fuel, supplies, and maintenance materials. Through the second quarter, expenditures were $55,944, 30% of the budget.
Interdepartmental Charges
Interdepartmental charges include indirect costs for personnel costs allocated to other funds, information systems, legal charges, and general liability. Through the second quarter, expenditures were $239,916. This was due to the general liability premium being paid in full at the beginning of the fiscal year. Staff is recommending adjustments to increase interdepartmental charges by $29,230 primarily for various information technology services.
Asset/Capital Outlay
Asset/capital outlay includes non-major asset acquisition and improvements, such as computer equipment and furniture, as well as several major capital projects to be funded by the General Fund unassigned fund balance. Through the second quarter, asset/capital outlay expenditures were $439,302, 6% of the budget. Staff is recommending adjustments to decrease asset/capital outlay by $250,000 because the City budgeted funds for Pinole Energy Enhancement Rebate (PEER) but made the payment to the County at the end of the prior fiscal year.
Each fiscal year, capital needs are assessed and prioritized through the CIP planning process. Capital improvement projects are detailed in a separate Five-Year Capital Improvement Plan (CIP): https://www.pinole.gov/wp-content/uploads/2024/08/FinalProposed-FY-2024-45-through-2028-29-CIP-6-18-24.pdf.
Debt Service
Debt service includes the payment of debt for the 2006 pension obligation bonds (POBs) that were issued to finance the City’s unfunded accrued actuarial liability with CalPERS. This category was at 100% of the revised budget due to the debt payment being paid in full at the beginning of the fiscal year.
Transfers Out
Transfers out includes the transfers from the General Fund and Measure S to other funds to support Recreation programs, Pinole Community Television (PCTV), vehicle and equipment replacement. The transfers are processed later in the fiscal year
FY 2024/25 Second Quarter Financial Report
General Fund Expenditures
23 Non-General Funds
The following analysis provides explanations of the financial activity for select non-general funds.
Since the second quarter represents 50% of the fiscal year, it is expected that actual revenues and actual expenditures will be around 50% of budget. However, this may vary depending on the timing of certain receipts and disbursements. Also, these funds include capital improvement projects which may take several fiscal years to be completed.
Special Revenue Funds
Gas Tax Fund (Fund 200)
The Gas Tax Fund accounts for revenue from State excise taxes on gasoline and diesel fuel sales (referred to as the Highway Users Tax Account (HUTA)) as well as revenue from the Road Repair and Accountability Act of 2017 (SB1) (referred to as the Road Maintenance and Rehabilitation Account (RMRA)). Gas Tax Fund resources are restricted for use in the construction and maintenance of public streets. These funds support both annual operating and capital projects. Through the second quarter, revenues were $534,063, 51% of the budget. Expenditures including encumbrances were $211,331, 9% of the budget. Actual expenditures were low due to the timing of budgeted capital projects.
Public Safety Augmentation Fund (Fund 203)
The Public Safety Augmentation Fund (PSAF) accounts for monies allocated by the County Auditor-Controller under Proposition 172 from the statewide 0.5% sales tax based on a share of statewide taxable sales. These funds are used for public safety personnel costs and safety equipment purchases. Through the second quarter, revenues were $115,927, 46% of the budget. There is typically a one-month delay in receiving the funds for the previous month. Expenditures were $250,725, 46% of the budget.
Gas Tax Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of
Amended
Budget
Projected
Year-End
Revenues $ 1,046,400 $ 1,046,400 $ 1,046,400 $ 534,063 51% $ 1,046,400 Expenditures 2,203,189 2,203,189 - 2,203,189 211,331 9% 2,203,189 Net surplus/deficit (1,156,789) (1,156,789) - (1,156,789) $ 322,732 (1,156,789) Beginning Fund Balance 1,589,060 1,589,060 1,589,060 1,589,060 Ending Fund Balance $ 432,271 $ 432,271 $ 432,271 $ 432,271 Page 301 of 320 FY 2024/25 Second Quarter Financial Report
Non-General Funds
24 Supplemental Law Enforcement Services Fund (Fund 206) The Supplemental Law Enforcement Services Fund (SLESF) accounts for funds received from the County under AB 3229, which enacted the Citizens Option for Public Safety (COPS) Program, through which the City receives $100,000 annually. In addition to the $100,000 annual payment, the City receives a Growth Allocation payment. The funds are used for officer personnel costs and safety equipment purchases. Through the second quarter, revenues were $183,189, 105% of the budget. Expenditures were $151,929, 52% of the budget. The overage was due to the purchase of a vehicle, which is budgeted.
NPDES Storm Water Fund (Fund 207)
The NPDES Storm Water Fund accounts for assessments collected by the County via property tax bills and provided to the City for stormwater programs pursuant to the National Pollutant Discharge Elimination System (NPDES) regulations, a federally mandated program. Assessments are levied at $35 per Equivalent Runoff Unit (ERU). Revenues are received in December, April, and June through property tax assessments. Through the second quarter, expenditures were $271,262, 71% of the budget. The overage was attributable to one-time costs for the storm drain master plan and project management support.
Recreation Fund (Fund 209)
The Recreation Department Fund accounts for funds received from fees for participation in recreational programs. While the recreation programs of the Community Services Department have operated on a limited basis in some areas, program participation and facility rentals are starting to increase. Through the second quarter, program revenues were Public Safety Augmentation FundFY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 249,855 $ 249,855 $ 249,855 $ 115,927 46% $ 249,855 Expenditures 546,413 546,413 546,413 250,725 46% 546,413 Net surplus/deficit (296,558) (296,558) - (296,558) $ (134,797) (296,558) Beginning Fund Balance 359,962 359,962 359,962 359,962
Ending Fund Balance $ 63,404 $ 63,404 $ 63,404 $ 63,404 Supplemental Law
Enforcement Services
Fund
FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 175,000 $ 175,000 $ 175,000 $ 183,189 105% $ 175,000 Expenditures 294,962 294,962 - 294,962 151,929 52% 294,962 Net surplus/deficit (119,962) (119,962) - (119,962) $ 31,260 (119,962) Beginning Fund Balance 303,559 303,559 303,559 303,559
Ending Fund Balance $ 183,597 $ 183,597 $ 183,597 $ 183,597 NPDES Storm Water Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 253,272 $ 253,272 $ 253,272 $ 147 0% 253,272 Expenditures 379,829 379,829 379,829 271,262 71% 379,829 Net surplus/deficit (126,557) (126,557) - (126,557) $ (271,114) (126,557) Beginning Fund Balance (123,627) (123,627) (123,627) (123,627) Ending Fund Balance $ (250,184) $ (250,184) $ (250,184) $ (250,184) Page 302 of 320 FY 2024/25 Second Quarter Financial Report
Non-General Funds
25 $459,175, 91% of the budget. With the General Fund operating subsidy, revenues were $1,030,352, 82% of the budget. Expenditures were $1,019,722, 43% of the budget.
Community Services received a $167,050 contribution from the West Contra Costa Youth Soccer League to renovate the soccer field and a $10,000 contribution to go toward youth programs. Therefore, staff is recommending adjustments to increase the revenue budget by $167,050. Staff is also recommending increasing the expenditure budget by $231,050 to appropriate the funds received from the contributions and to bring the recreation coordinators from part-time to full-time.
Building and Planning Fund (Fund 212)
The Building & Planning Fund accounts for funds received from fees and permits for building and planning services. Fees are collected to recover the cost primarily related to inspections and plan checks performed. Through the second quarter, revenues were $604,259, 41% of the budget. Expenditures were $1,031,891, 48% of the budget. Staff is recommending the adjustments to reduce the revenue budget by $34,500 related to CEQA studies. Also, staff is recommending reducing the expenditure budget by $76,400 as implementation of the Housing Element notifications/materials are anticipated to be less than projected, CEQA assistance will not be needed this fiscal year, and less backfill is anticipated for permit techs, inspections, and building official. Lastly, staff is recommending adding one full-time, permanent Associate Planner; there is no fiscal impact as funds will be reallocated from the outside contract.
Refuse Management Fund (Fund 213)
The Refuse Management Fund accounts for resources received from the City’s franchise waste hauler, Republic Services, from a monthly fee imposed under AB 939 on all residential customers in Pinole. These revenues are restricted to programs and activities that promote Recreation Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues
Program Revenue $ 504,356 $ 504,356 $ 177,050 $ 681,406 $ 459,175 91% $ 681,406 Transfers In 751,300 751,300 751,300 571,177 76% 751,300 Total Revenues 1,255,656 1,255,656 177,050 1,432,706 1,030,352 82% 1,432,706 Expenditures 2,380,256 2,380,256 231,050 2,611,306 1,019,722 43% 2,611,306 Net surplus/deficit (1,124,600) (1,124,600) (54,000) (1,178,600) $ 10,630 (1,178,600) Beginning Fund Balance (13,804) (13,804) (13,804) (13,804) Ending Fund Balance $ (1,138,404) $ (1,138,404) $ (1,192,404) $ (1,192,404) Building and Planning Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 1,415,526 $ 1,415,526 $ (34,500) $ 1,381,026 $ 604,259 43% $ 1,381,026 Transfers In 67,000 67,000 - 67,000 - 0% 67,000
Total Revenues $ 1,482,526 $ 1,482,526 $ (34,500) $ 1,448,026 $ 604,259 41% 1,448,026 Expenditures 2,039,558 2,219,558 (76,400) 2,143,158 1,031,891 48% 2,143,158 Net surplus/deficit (557,032) (737,032) 41,900 (695,132) $ (427,632) (695,132) Beginning Fund Balance (2,226,679) (2,226,679) (2,226,679) (2,226,679) Ending Fund Balance $ (2,783,711) $ (2,963,711) $ (2,921,811) $ (2,921,811) Page 303 of 320 FY 2024/25 Second Quarter Financial Report
Non-General Funds
26 recycling of solid waste and source reduction. Through the second quarter, revenues were $31,097, 47% of the budget. Expenditures were $70,764, 38% of the budget.
Solid Waste Fund (Fund 214)
The Solid Waste Fund accounts for funds received from Republic Services from a monthly fee it assesses on customer rates for solid waste services. These funds are set aside for future solid waste capital projects and for a rate stabilization fund. Revenues are received on a quarterly basis and the first installment is typically received in October. Through the second quarter, revenues were $278,018, 76% of the budget. Expenditures were $56,121, 32% of the budget.
Measure J Fund (Fund 215)
The Measure J Fund accounts for special sales tax revenues collected by the Contra Costa Transportation Authority (CCTA) and reapportioned to the cities for local street projects. The City must submit a checklist each year to confirm compliance with a Growth Management Program in order to receive these funds. Estimates of annual funding are provided by the CCTA, and jurisdiction allocations are based on a formula that considers both population and road mileage. Additionally, the fund accounts for funds received from State grants, including the Transportation Land-Use Connections (TLC) grant, One Bay Area Grant (OBAG), and Highway Safety Improvement Program (HSIP) grant. Through the second quarter, revenues from partial grant reimbursements were $145,982, 13% of the budget.
Revenue from CCTA is expected to be received later in the fiscal year. Expenditures were $218,090, 13% of the budget. Actual expenditures align with the timing of capital projects.
Refuse Management Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 66,060 $ 66,060 $ 66,060 $ 31,097 47% $ 66,060 Expenditures 187,102 187,102 187,102 70,764 38% 187,102 Net surplus/deficit (121,042) (121,042) - (121,042) $ (39,666) (121,042) Beginning Fund Balance 31,420 31,420 31,420 31,420
Ending Fund Balance $ (89,622) $ (89,622) $ (89,622) $ (89,622) Solid Waste Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 368,000 $ 368,000 $ 368,000 $ 278,018 76% $ 368,000 Expenditures 173,666 173,666 173,666 56,121 32% 173,666 Net surplus/deficit 194,334 194,334 - 194,334 $ 221,897 194,334 Beginning Fund Balance 2,915,815 2,915,815 2,915,815 2,915,815 Ending Fund Balance $ 3,110,149 $ 3,110,149 $ 3,110,149 $ 3,110,149 Measure J Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 1,152,257 $ 1,152,257 $ 1,152,257 $ 145,982 13% $ 1,152,257 Expenditures 1,705,126 1,705,126 1,705,126 218,090 13% 1,705,126 Net surplus/deficit (552,869) (552,869) - (552,869) $ (72,107) (552,869) Beginning Fund Balance 2,357,194 2,357,194 2,357,194 2,357,194 Ending Fund Balance $ 1,804,325 $ 1,804,325 $ 1,804,325 $ 1,804,325 Page 304 of 320 FY 2024/25 Second Quarter Financial Report
Non-General Funds
27 Development Growth Impact Fund (Fund 276)
The Growth Impact Fund accounts for development fees collected to mitigate the impact of new development. Specifically, it provides for the expansion, design, construction, or upgrade to facilities, roadways, and equipment. The City collects impact fees for police, fire protection, municipal, community, wastewater, roadways, and drainage. Through the second quarter, impact fee revenue from interest was $49,810. Staff is recommending an adjustment to reduce the revenue budget as the amounts budgeted were carried forward from the prior fiscal year. The capital projects budgeted will be funded by the available fund balance.
Housing Assets for Resale Fund (Fund 285)
The Housing Assets for Resale Fund accounts for activities associated with administering housing programs of the former Pinole Redevelopment Agency, use of Housing Set Aside funds, and the provision of affordable housing within the community. Through the second quarter, revenue from interest was $49,561, 90% of the budget. Expenditures were $95,964, 30% of the budget.
Lighting and Landscape District Fund (Fund 310)
The Lighting and Landscape District Fund accounts for assessments to property owners to maintain median lighting and landscaping within the Pinole Valley Road North and South areas. Revenue is received in December, April, and June with property tax payments.
Through the second quarter, revenue was $32,758, 51% of the budget. Expenditures were $8,575, 10% of the budget.
Growth Impact Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 1,039,594 $ 1,039,594 $ (1,039,594) $ 0 $ 49,810 5% $ 0 Expenditures 1,623,000 1,623,000 1,623,000 - 0% 1,623,000 Net surplus/deficit (583,406) (583,406) (1,039,594) (1,623,000) $ 49,810 (1,623,000) Beginning Fund Balance 3,503,560 3,503,560 3,503,560 3,503,560 Ending Fund Balance $ 2,920,155 $ 2,920,155 $ 1,880,561 $ 1,880,561 Housing Assets for Resale
Fund
FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 55,000 $ 55,000 $ 55,000 $ 49,561 90% $ 55,000 Expenditures 323,243 323,243 323,243 95,964 30% 323,243 Net surplus/deficit (268,243) (268,243) - (268,243) $ (46,403) (268,243) Beginning Fund Balance 8,267,770 8,267,770 8,267,770 8,267,770 Ending Fund Balance $ 7,999,527 $ 7,999,527 $ 7,999,527 $ 7,999,527 Landscape and Lighting
District Fund
FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 63,911 $ 63,911 $ 63,911 $ 32,758 51% $ 63,911 Expenditures 85,175 85,175 85,175 8,575 10% 85,175
Net surplus/deficit (21,264) (21,264) - (21,264) $ 24,184 (21,264) Beginning Fund Balance 76,278 76,278 76,278 76,278
Ending Fund Balance $ 55,014 $ 55,014 $ 55,014 $ 55,014 Page 305 of 320 FY 2024/25 Second Quarter Financial Report
Non-General Funds
28 Capital Project Funds
City Street Improvement Fund (Fund 325)
The City Street Improvements Fund accounts for an annual $250,000 transfer from Measure S 2014 for street improvement projects. Additionally, it accounts for funds received from various grants, including the Highway Bridge Program (HBP) grant, Strategic Management Planning Program (STMP) grant, and Transportation Development Act (TDA) grant. Grant revenue is received on a reimbursement basis, after expenditures are incurred. Through the second quarter, revenues were $423,152 (including the General Fund transfer), 20% of the budget. Expenditures were $161,511, 4% of the budget. Actual expenditures are low due to the timing of capital projects.
Arterial Streets Rehabilitation Fund (Fund 377)
The Arterial Streets Rehabilitation Fund accounts for an annual $250,000 transfer from Measure S 2014 for street rehabilitation projects. Through the second quarter, revenue was $250,000 which was the transfer in from the General Fund. There were no expenditures.
Enterprise Funds
Sewer Enterprise Fund (Fund 500)
The Sewer Enterprise Fund accounts for fees charged to residents and businesses for sewer utilities. Fees are used to operate the Pinole-Hercules Wastewater Treatment Plant, which serves the Pinole and Hercules areas. Hercules remits payment for services to Pinole on a monthly basis. Revenue from charges for services are received with the property tax assessments in December, April, and June. Through the second quarter, revenues were $4,925,877, 48% of the budget. Expenditures were $4,804,447, 13% of the budget. Actual expenditures are low due to the timing of capital projects.
City Street Improvement
Fund
FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 2,064,683 $ 2,064,683 $ 2,064,683 $ 423,152 20% $ 2,064,683 Expenditures 3,687,304 3,687,304 3,687,304 161,511 4% 3,687,304 Net surplus/deficit (1,622,621) (1,622,621) - (1,622,621) $ 261,640 (1,622,621) Beginning Fund Balance 2,051,278 2,051,278 2,051,278 2,051,278 Ending Fund Balance $ 428,657 $ 428,657 $ 428,657 $ 428,657 Arterial Streets
Rehabilitation Fund
FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 250,000 $ 250,000 $ 250,000 $ 250,000 100% $ 250,000 Expenditures 895,000 895,000 895,000 - 0% 895,000
Net surplus/deficit (645,000) (645,000) (645,000) $ 250,000 (645,000) Beginning Fund Balance 1,003,071 1,003,071 1,003,071 1,003,071 Ending Fund Balance $ 358,071 $ 358,071 $ 358,071 $ 358,071 Page 306 of 320 FY 2024/25 Second Quarter Financial Report
Non-General Funds
29 Cable Access TV Fund (Fund 505)
The Cable Access TV Fund accounts for revenue received from cable franchise fees, video production and broadcast charges, and Public, Educational, and Governmental (PEG) access fees. PEG access fees are designated for equipment purchases. Transfers from the General Fund also help support the operating costs. Revenues are generally received on a quarterly basis. Through the second quarter, revenues were $240,230, 65% of the budget.
Expenditures were $301,330, 36% of the budget. Staff is recommending adjustments to reduce the expenditure budget by $85,000 as staff will be completing the PCTV master plan ($25,000) in house and the studio live truck cameras ($60,000) will not be replaced this fiscal year.
Information Systems Fund (Fund 525)
The Information Systems Fund is an internal service fund used to account for activities that provide technology goods or services to other City funds and departments on a costreimbursement basis. Through the second quarter, expenditures and reimbursements were $877,742, 56% of the budget. Staff is recommending adjustments to increase the expenditure and cost allocation (reimbursements) budgets by $34,230 for the Stancil Multi Channel Voice Logging Recorder System used in the dispatch center ($19,230) and for the increase in support services related to the online permitting system ($15,000). Also, the City will be transitioning the Information Technology (IT) function from a contracted service to an internal department. Therefore, staff is recommending adding one full-time, permanent IT Manager. There is no fiscal impact as funds will be reallocated from the outside contract.
Sewer Enterprise Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 10,364,403 $ 10,364,403 $ 10,364,403 $ 4,925,877 48% $ 10,364,403 Expenditures 37,771,365 37,771,365 - 37,771,365 4,804,447 13% 37,771,365 Net surplus/deficit (27,406,962) (27,406,962) - (27,406,962) $ 121,430 (27,406,962) Beginning Fund Balance 21,657,361 21,657,361 21,657,361 21,657,361 Ending Fund Balance $ (5,749,601) $ (5,749,601) $ (5,749,601) $ (5,749,601) Cable Access TV Fund FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Revenues $ 368,533 $ 368,533 $ - $ 368,533 $ 240,230 65% $ 368,533 Expenditures 829,463 833,883 (85,000) 748,883 301,330 36% 748,883 Net surplus/deficit (460,930) (465,350) (85,000) (380,350) $ (61,100) (380,350) Beginning Fund Balance 2,120 2,120 2,120 2,120
Ending Fund Balance $ (458,809) $ (463,229) $ (378,229) $ (378,229) Information Technology
Fund
FY 2024/25
Original
Budget
FY 2024/25
Revised
Budget
Proposed
Adjustments
FY 2024/25
Amended
Budget
FY 2024/25
YTD Actuals w/
Encumb.
% of Amended
Budget
Projected
Year-End
Expenditures 1,572,339 1,572,339 34,230 1,572,339 877,742 56% 1,606,569 Indirect Cost Allocations (1,572,533) (1,572,533) (34,230) (1,572,533) (877,742) 56% (1,606,763) Net surplus/deficit (194) (194) - (194) (0) (194)
Beginning Fund Balance (3,129) (3,129) (3,129) (3,129)
Ending Fund Balance $ (3,323) $ (3,323) $ (3,323) $ (3,323) Page 307 of 320 FY 2024/25 Second Quarter Financial Report
Financial Summary by Fund
30 Financial Summary by Fund
The Second Quarter Financial Summary by Fund (Attachment B) summarizes all City funds’ revenues, expenditures, and estimated beginning and ending fund balances. It includes preliminary year-end financial results. Also, it contains explanations of all proposed midyear budget adjustments.
Projected
Year-End Notes
6,168,067 6,168,067 6,168,067 3,267,490 3,267,490 (2,900,577) 53% 6,168,067 4,536,436 4,536,436 (77,280) 4,459,156 1,657,166 1,657,166 (2,801,990) 37% 4,459,156 [1] 2,581,000 2,581,000 (31,000) 2,550,000 969,991 969,991 (1,580,009) 38% 2,550,000 [2] 2,581,000 2,581,000 (31,000) 2,550,000 963,511 963,511 (1,586,489) 38% 2,550,000 [3] - - 600,000 600,000 - - (600,000) 0% 600,000 [4]
2,285,000 2,285,000 2,285,000 1,282,245 1,282,245 (1,002,755) 56% 2,285,000 850,000 850,000 850,000 336,185 336,185 (513,815) 40% 850,000 924,599 924,599 (60,000) 864,599 323,901 323,901 (540,698) 37% 864,599 460,000 460,000 (60,000) 400,000 159,558 159,558 (240,442) 40% 400,000 [5] 464,599 464,599 464,599 164,343 164,343 (300,256) 35% 464,599 2,402,673 2,402,673 2,402,673 1,187,655 1,187,655 (1,215,018) 49% 2,402,673 - - 33,461 33,461 33,461 33,461 0 100% 33,461 [6]
95,882 95,882 95,882 59,789 59,789 (36,093) 62% 95,882
47,025 47,025 47,025 1,000 1,000 (46,025) 2% 47,025
251,700 251,700 251,700 110,689 110,689 (141,011) 44% 251,700 25,500 25,500 25,500 847 847 (24,653) 3% 25,500
65,854 65,854 65,854 56,441 56,441 (9,413) 86% 65,854
47,000 47,000 47,000 8,932 8,932 (38,068) 19% 47,000
15,550 15,550 10,500 26,050 23,388 23,388 (2,662) 90% 26,050 [7] 1,774,307 1,774,307 1,774,307 1,045,496 1,045,496 (728,811) 59% 1,774,307 200,000 200,000 200,000 (1,110) (1,110) (201,110) -1% 200,000 81,450 81,450 81,450 43,983 43,983 (37,467) 54% 81,450
11,500 11,500 11,500 182,535 182,535 171,035 1587% 11,500 5,100 5,100 5,100 4,139 4,139 (961) 81% 5,100
1,000 1,000 1,000 1,165 1,165 165 116% 1,000
24,950,643 24,950,643 444,681 25,395,324 11,558,900 - 11,558,900 (13,836,424) 46% 25,395,324 2,425,000 2,425,000 - 2,425,000 - - (2,425,000) 0% 2,425,000 843,790 843,790 - 843,790 - - (843,790) 0% 843,790
28,219,433 28,219,433 444,681 28,664,114 11,558,900 - 11,558,900 (17,105,214) 40% 28,664,114 NOTES:
[1] Reduce the sales tax revenue budget based on updated projections provided by HdL, the City's sales tax consultant. [2] Reduce the Measure S 2006 sales tax revenue budget based on updated projections provided by HdL, the City's sales tax consultant. [3] Reduce the Measure S 2014 sales tax revenue budget based on updated projections provided by HdL, the City's sales tax consultant. [4] Establish the budget for Measure I 2024 sales tax revenue budget. The City will receive one quarter of the revenue since the measure is effective 4/1/2025. [5] Reduce the TOT revenue budget based on current trends in short-term lodging in the City. [6] Increase the federal grants revenue to account for a reimbursement received from FEMA from a prior year's fire incident. [7] Increase the fines and forfeitures revenue budget to account for upward trend in violation fees.
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
General Fund (including Measure S 2006 and 2014)
Revenue
311- Property Taxes
312- Sales and Use Taxes
312- Sales and Use Taxes-Meas S 2006
312- Sales and Use Taxes-Meas S 2014
313- Utility Users Tax (UUT)
314- Franchise Taxes
315- Other Taxes
312- Sales and Use Taxes-Meas I 2024
Other Tax/Transient Occupancy Tax (TOT)
Other Tax/Business License
321- Intergovernmental Taxes
322-Federal Grants
323- State Grants
324- Other Grants
332- Permits
341- Review Fees
342- Other Fees
343- Abatement Fees
351- Fines and Forfeiture
361- Public Safety Charges
370- Interest and Investment Income
381- Rental Income
383- Reimbursements
384- Other Revenue
392- Proceeds from Sale of Property
Revenue Total:
399- Pension Trust 115 Transfer
399-General Reserve Transfer
Sources Total:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
202,339 202,339 202,339 67,037 67,037 135,302 33% 202,339 683,857 683,857 683,857 273,010 273,010 410,847 40% 683,857 [8] 717,294 717,294 13,930 731,224 338,058 338,058 393,166 46% 731,224 [9] 10,148 10,148 10,148 5,167 5,167 4,981 51% 10,148
297,031 297,031 297,031 154,856 154,856 142,175 52% 297,031 581,131 581,131 581,131 226,982 226,982 354,149 39% 581,131 (284,100) (284,100) (284,100) (72,127) (72,127) (211,973) 25% (284,100) 966,217 966,217 3,000 969,217 525,885 525,885 443,332 54% 969,217 [10] 888,867 888,867 888,867 452,836 452,836 436,031 51% 888,867 [11] 1,059,644 1,059,644 1,059,644 912,842 912,842 146,802 86% 1,059,644 4,825,397 4,825,397 16,930 4,842,327 2,729,691 - 2,729,691 2,112,635 56% 4,842,327 6,952,098 6,952,098 6,952,098 3,514,916 3,514,916 3,437,182 51% 6,952,098 1,582,951 1,582,951 1,582,951 658,877 658,877 924,074 42% 1,582,951 2,548,869 2,548,869 19,230 2,568,099 1,342,922 1,342,922 1,225,177 52% 2,568,099 [12] 3,582,500 3,582,500 3,582,500 1,658,042 1,658,042 1,924,458 46% 3,582,500 14,666,418 14,666,418 19,230 14,685,648 7,174,757 - 7,174,757 7,510,891 49% 14,685,648 622,287 622,287 (245,500) 376,787 248,486 248,486 128,302 66% 376,787 [13] 486,573 486,573 486,573 252,354 2,888 255,241 231,332 52% 486,573 929,920 929,920 929,920 400,859 38,781 439,640 490,280 47% 929,920 356,460 356,460 356,460 197,330 197,330 159,130 55% 356,460 2,395,240 2,395,240 (245,500) 2,149,740 1,099,029 41,668 1,140,697 1,009,043 53% 2,149,740 17,148 17,148 17,148 5,358 5,358 11,790 31% 17,148
399,687 399,687 (27,500) 372,187 192,832 192,832 179,355 52% 372,187 [14] 148,953 148,953 (25,000) 123,953 35,934 22,876 58,811 65,142 47% 123,953 [15] 565,788 565,788 (52,500) 513,288 234,124 22,876 257,000 256,287 50% 513,288 3,500 3,500 3,500 869 869 2,631 25% 3,500
202,430 202,430 202,430 36,830 36,830 165,600 18% 202,430 220,935 220,935 220,935 99,612 99,612 121,323 45% 220,935 426,865 426,865 - 426,865 137,311 - 137,311 289,554 32% 426,865 636,107 636,107 636,107 636,015 636,015 92 100% 636,107 777,800 777,800 777,800 597,677 597,677 180,123 77% 777,800 24,293,615 24,293,615 (261,840) 24,031,775 12,608,603 64,545 12,673,148 (11,358,627) 53% 24,031,775 2,450 2,450 2,450 60 60 2,390 2% 2,450
1,147,981 1,147,981 1,147,981 489,165 489,165 658,816 43% 1,147,981 1,478,192 1,478,192 1,478,192 715,014 715,014 763,178 48% 1,478,192 1,750,000 1,750,000 1,750,000 - - 1,750,000 0% 400,000
1,530,000 1,530,000 1,530,000 - - 1,530,000 0% -
5,908,623 5,908,623 - 5,908,623 1,204,239 - 1,204,239 4,704,384 20% 3,028,623 NOTES:
[8] Reclassify the Assistant to the City Manager position to Communications Director and redirect funds from professional services to temporary staffing for a seasonal/limited term admin coordinator position. No fiscal impact as the increases can be offset by savings in the current budget [9] Increase the expenditure budget to account for higher than projected costs related to the November 2024 election. [10] Increase expenditure budget for continued support related to the online permitting system. [11] Reclassify the Human Resources Technician to Human Resources Specialist. No fiscal impact as the increase can be offset by savings in the current budget. [12] Increase expenditure budget for carry forward of Stancil Multi Channel Voice Logging Recorder System. [13] Reduce the expenditure budget as the one-time payment was made to the County for the Pinole Energy Enhancement Rebate (PEER) at the end of the prior fiscal year (FY 2023/24).
Increase expenditure budget for continued support related to the online permitting system ($4,500). [14] Reduce the expenditure budget for: printing related to the tobacco grant ($10,000); abatement ($20,000). Increase expenditure budget for continued support related to the online permitting system ($2,500).
[15] Reduce the expenditure budget for economic development final branding strategy as work has been stalled due to staffing.
Fund: 100- General Fund
Expenditures
Division: 110- City Council Total:
Division: 111- City Manager Total:
Division: 112- City Clerk Total:
Division: 113- City Treasurer Total:
Division: 114- City Attorney Total:
City Attorney Services
City Attorney Indirect Cost Allocations
Division: 115- Finance Department Total:
Division: 116- Human Resources Total:
Division: 117- General Government Total:
Total Administrative:
Division: 221- Police Operations Total:
Division: 222- Police Support Services Total:
Division: 223- Dispatch WBCC Total:
Division: 231- Fire Total:
Total Public Safety:
Division: 341- Administration/Engineering Total:
Division: 342- Road Maintenance Total:
Division: 343- Facility Maintenance Total:
Division: 345- Park Maintenance Total:
Public Works Total:
Division: 461- Planning Total:
Division: 465- Code Enforcement Total:
Division: 466- Economic Development Total:
Community Development Total:
Division: 551- Recreation Administration Total:
Division: 560- Library Services Total:
Division: 561 Animal Control Services Total:
Community Services Total:
Debt Service:
Operating Transfer Out:
Expenditure Total:
Fund: 105 - Measure S -2006
Expenditures
Division: 115- Finance Department Total:
Division: 221- Police Operations Total:
Division: 231- Fire Total:
Division: 342- Road Maintenance Total:
Division: 343- Facility Maintenance Total:
Expenditures Total:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
- - - - - - 0% -
2,450 2,450 2,450 360 360 2,090 15% 2,450
- - - - - - 0% -
2,450 2,450 - 2,450 360 - 360 2,090 15% 2,450
- - - - - - 0% -
126,138 126,138 126,138 64,898 64,898 61,240 51% 126,138 1,372,769 1,372,769 1,372,769 664,020 664,020 708,749 48% 1,372,769 1,498,907 1,498,907 - 1,498,907 728,918 - 728,918 769,989 49% 1,498,907 229,895 229,895 150,000 379,895 36,444 161,261 197,706 182,189 52% 379,895 [16] 854,730 854,730 854,730 61,209 73,744 134,953 719,777 16% 854,730 1,898,663 1,898,663 1,898,663 78,398 128,931 207,329 1,691,334 11% 1,898,663 1,450,000 1,450,000 1,450,000 27,899 133,199 161,098 1,288,902 11% 1,450,000 260,000 260,000 260,000 - - 260,000 0% 260,000
4,693,288 4,693,288 150,000 4,843,288 203,951 497,135 701,086 4,142,202 14% 4,843,288 20,000 87,050 87,050 9,694 9,694 77,356 11% 87,050
20,000 87,050 - 87,050 9,694 - 9,694 77,356 11% 87,050
- - - - - - 0% -
15,300 15,300 15,300 - - 15,300 0% 15,300
- - - - - - 0% -
15,300 15,300 - 15,300 - - - 15,300 0% 15,300
6,229,945 6,296,995 150,000 6,446,995 942,923 497,135 1,440,058 5,006,937 22% 6,446,995 783,500 783,500 783,500 783,500 783,500 - 100% 783,500
7,013,445 7,080,495 150,000 7,230,495 1,726,423 497,135 2,223,558 5,006,937 31% 7,230,495 37,215,683 37,282,733 (111,840) 37,170,893 15,539,265 561,680 16,100,945 21,069,948 43% 34,290,893 (8,996,250) (9,063,300) 556,521 (8,506,779) (3,980,365) (561,680) (4,542,045) (3,964,734) 53% (5,626,779) Fund Balance July 1, 2024 7,978,729 7,978,729 7,978,729 7,978,729 7,978,729 Estimated Fund Balance June 30, 2025 (1,017,521) (1,084,571) (528,050) 3,998,363 2,351,950 309,000 309,000 309,000 273,628 273,628 (35,372) 89% 309,000 309,000 309,000 - 309,000 273,628 - 273,628 (35,372) 89% 309,000 843,790 843,790 843,790 - - (843,790) 0% 843,790
(534,790) (534,790) - (534,790) 273,628 273,628 808,418 -51% (534,790) Fund Balance July 1, 2024 10,266,058 10,266,058 10,266,058 10,266,058 10,266,058 Estimated Fund Balance June 30, 2025 9,731,268 9,731,268 9,731,268 10,539,687 9,731,268 NOTES:
[16] Increase expenditure budget for increase to SKL Solutions contract for staff augmentation.
Fund: 106 - Measure S-2014
Expenditures
Division: 110- City Council Total:
Division: 115- Finance Department Total:
Division: 118- Information Systems Total:
Total Administrative:
Division: 221- Police Operations Total:
Division: 222- Police Support Services Total:
Division: 231- Fire Total:
Total Public Safety:
Division: 341- Admin/Engineering Total:
Division: 342- Road Maintenance Total:
Division: 343- Facility Maintenance Total:
Division: 344- NPDES Storm Drain Total:
Division: 345- Park Maintenance Total:
Public Works Total:
Division: 466- Economic Development Total:
Community Development Total:
Division: 552- Senior Center Total:
Division: 553- Tiny Tots Total:
Division: 554- Youth Center Total:
Community Services Total:
Sub-Total:
Operating Transfer Out:
Expenditure Total:
General Fund and Measure S Expenditure Total:
General Fund and Measure S Net Results:
Fund: 150 - General Reserve
370- Interest and Investment Income
Revenue Total:
499- Transfer Out Total:
General Reserve Net Results:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
- - - - - - 0% -
- - - - - - - - 0% -
150,000 150,000 150,000 150,000 150,000 - 100% 150,000
150,000 150,000 - 150,000 150,000 - 150,000 - 100% 150,000 - - - 6,886 6,886 (6,886) 0% -
120,000 120,000 21,275 141,275 - 110,783 110,783 30,492 78% 141,275 [17] 80,000 80,000 80,000 1,277 68,673 69,950 10,050 87% 80,000 5,000 5,000 5,000 - - 5,000 0% 5,000
- - 47,744 47,744 47,744 47,744 1 100% 47,744 [18]
- - 23,872 23,872 23,872 23,872 0 100% 23,872 [19]
205,000 205,000 92,891 297,891 79,779 179,456 259,235 38,656 87% 297,891 (55,000) (55,000) (55,000) 70,221 (179,456) (109,235) 38,656 199% (147,891) Fund Balance July 1, 2024 378,780 378,780 378,780 378,780 378,780 Estimated Fund Balance June 30, 2025 323,780 323,780 323,780 449,002 230,889 1,033,764 1,033,764 1,033,764 511,702 511,702 (522,062) 49% 1,033,764 5,000 5,000 5,000 22,361 22,361 17,361 447% 5,000
7,636 7,636 7,636 - - (7,636) 0% 7,636
1,046,400 1,046,400 - 1,046,400 534,063 - 534,063 512,337 51% 1,046,400 - - - - - - 0% -
2,203,189 2,203,189 2,203,189 206,292 5,039 211,331 1,991,858 10% 2,203,189 2,203,189 2,203,189 - 2,203,189 206,292 5,039 211,331 1,991,858 10% 2,203,189 (1,156,789) (1,156,789) (1,156,789) 327,771 (5,039) 322,732 1,479,521 -28% (1,156,789) Fund Balance July 1, 2024 1,589,060 1,589,060 1,589,060 1,589,060 1,589,060 Estimated Fund Balance June 30, 2025 432,271 432,271 432,271 1,916,831 432,271 3,175 3,175 3,175 - - (3,175) 0% 3,175
36,816 36,816 36,816 - - (36,816) 0% 36,816
- - - - - - 0% -
39,991 39,991 - 39,991 - - - 39,991 0% 39,991
26,000 26,000 26,000 7,963 7,963 18,037 31% 26,000
26,000 26,000 - 26,000 7,963 - 7,963 18,037 31% 26,000
13,991 13,991 13,991 (7,963) (7,963) (21,954) -57% 13,991 Fund Balance July 1, 2024 133,438 133,438 133,438 133,438 133,438 Estimated Fund Balance June 30, 2025 147,429 147,429 147,429 125,475 147,429 239,855 239,855 239,855 112,477 112,477 (127,378) 47% 239,855 10,000 10,000 10,000 3,451 3,451 (6,549) 35% 10,000
249,855 249,855 - 249,855 115,927 - 115,927 (133,928) 46% 249,855 546,413 546,413 546,413 250,725 250,725 295,688 46% 546,413 546,413 546,413 - 546,413 250,725 - 250,725 295,688 46% 546,413 (296,558) (296,558) (296,558) (134,797) (134,797) 161,761 45% (296,558) Fund Balance July 1, 2024 359,962 359,962 359,962 359,962 359,962 Estimated Fund Balance June 30, 2025 63,404 63,404 63,404 225,165 63,404 NOTES:
[17] Increase expenditure budget to allocate funds for an asphalt spreader for the road maintenance division. [18] Increase expenditure budget to allocate funds for a vehicle for the building division. [19] Increase expenditure budget to allocate funds for a vehicle for recreation.
Fund: 160 - Equipment Reserve
392- Sale of Property
Revenue Total:
399- Transfers In Total:
Sources Total:
Expenditures
Division: 341- Admin and Engineering Total:
Division: 342- Road Maintenance Total:
Division: 345- Park Maintenance Total:
Division: 461- Planning Total:
Division: 462- Building Total:
Division: 551- Recreation Admin Total:
Expenditures Total:
Equipment Reserve Net Results:
Fund: 200 - Gas Tax Fund
321- Intergovernmental Taxes
370- Interest and Investment Income
383- Reimbursements
Revenue Total:
Expenditures
Division: 341- Admin and Engineering Total:
Division: 342- Road Maintenance Total:
Expenditures Total:
Gas Tax Fund Net Results:
Fund: 201 - Restricted Real Estate Maintenance Fund
342- Other Fees
381- Rental Income
384- Other Revenue
Revenue Total:
Expenditures
Division: 343- Facility Maintenance Total:
Expenditures Total:
Restricted Real Estate Maint Fund Net Results:
Fund: 203 - Public Safety Augmentation Fund
321- Intergovernmental Taxes
370- Interest and Investment Income
Revenue Total:
Expenditures
Division: 221- Police Operations Total:
Expenditures Total:
Public Safety Augmentation Fund Net Results:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
45,000 45,000 45,000 10,082 10,082 (34,918) 22% 45,000
1,500 1,500 1,500 4,134 4,134 2,634 276% 1,500
- - - - - - 0% -
46,500 46,500 - 46,500 14,216 - 14,216 (32,284) 31% 46,500 21,845 21,845 21,845 5,066 5,066 16,779 23% 21,845
35,000 35,000 35,000 - - 35,000 0% 35,000
56,845 56,845 - 56,845 5,066 - 5,066 51,779 9% 56,845
(10,345) (10,345) (10,345) 9,150 9,150 19,495 -88% (10,345) Fund Balance July 1, 2024 290,591 290,591 290,591 290,591 290,591 Estimated Fund Balance June 30, 2025 280,246 280,246 280,246 299,741 280,246 165,000 165,000 165,000 178,849 178,849 13,849 108% 165,000 10,000 10,000 10,000 4,340 4,340 (5,660) 43% 10,000
175,000 175,000 - 175,000 183,189 - 183,189 8,189 105% 175,000 294,962 294,962 294,962 151,929 15,794 167,723 127,239 57% 294,962 294,962 294,962 - 294,962 151,929 15,794 167,723 127,239 57% 294,962 (119,962) (119,962) (119,962) 31,260 (15,794) 15,466 135,428 -13% (119,962) Fund Balance July 1, 2024 303,559 303,559 303,559 303,559 303,559 Estimated Fund Balance June 30, 2025 183,597 183,597 183,597 334,818 183,597 253,272 253,272 253,272 - - (253,272) 0% 253,272
- - - - - - 0% -
- - - 147 147 147 0% -
- - - - - - 0% -
253,272 253,272 - 253,272 147 - 147 (253,125) 0% 253,272 7,974 7,974 7,974 3,575 3,575 4,399 45% 7,974
371,855 371,855 371,855 267,687 267,687 104,168 72% 371,855 379,829 379,829 - 379,829 271,262 - 271,262 108,567 71% 379,829 (126,557) (126,557) (126,557) (271,114) (271,114) (144,557) 214% (126,557) Fund Balance July 1, 2024 (123,627) (123,627) (123,627) (123,627) (123,627) Estimated Fund Balance June 30, 2025 (250,184) (250,184) (250,184) (394,741) (250,184) Fund: 205 - Traffic Safety Fund
351- Fines and Forfeitures
370- Interest and Investment Income
384- Other Revenue
Revenue Total:
Expenditures
Division: 227- Police Grants Total:
Division: 342- Road Maintenance Total:
Expenditures Total:
Traffic Safety Fund Net Results:
Fund: 206 - Supplemental Law Enforcement Svc Fund
323- State Grants
370- Interest and Investment Income
Revenue Total:
Expenditures
Division: 227- Police Grants Total:
Expenditures Total:
Sup Law Enforce Svc Fund Net Results:
Fund: 207 - NPDES Storm Water Fund
321- Intergovernmental Taxes
332- Licenses and Permits
370- Interest and Investment Income
399- Operating Transfer In
Revenue Total:
Expenditures
Division: 342- Road Maintenance Total:
Division: 344- NPDES Storm Drain Total:
Expenditures Total:
NPDES Storm Water Fund Net Results:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
109,246 109,246 167,050 276,296 220,150 220,150 (56,146) 80% 276,296 [20] 196,300 196,300 196,300 99,049 99,049 (97,251) 50% 196,300 112,010 112,010 112,010 72,117 72,117 (39,893) 64% 112,010 7,800 7,800 10,000 17,800 18,878 18,878 1,078 106% 17,800 [21] - - - - - - . -
79,000 79,000 79,000 48,981 48,981 (30,019) 62% 79,000
- - - - - - 0% -
- - - - - - 0% -
504,356 504,356 177,050 681,406 459,175 - 459,175 (222,231) 67% 681,406 751,300 751,300 751,300 571,177 571,177 (180,123) 76% 751,300 1,255,656 1,255,656 177,050 1,432,706 1,030,352 - 1,030,352 (402,354) 72% 1,432,706 -
7,500 7,500 7,500 3,915 3,915 3,585 52% 7,500
887,733 887,733 180,550 1,068,283 431,447 431,447 636,836 40% 1,068,283 [22] 663,944 663,944 13,500 677,444 237,333 237,333 440,112 35% 677,444 [23] 257,431 257,431 13,500 270,931 114,780 114,780 156,151 42% 270,931 [24] 358,107 358,107 23,500 381,607 135,950 135,950 245,658 36% 381,607 [25] 205,540 205,540 205,540 96,298 96,298 109,242 47% 205,540 2,380,256 2,380,256 231,050 2,611,306 1,019,722 - 1,019,722 1,591,584 39% 2,611,306 (1,124,600) (1,124,600) (54,000) (1,178,600) 10,630 - 10,630 1,189,230 -1% (1,178,600) Fund Balance July 1, 2024 (13,804) (13,804) (13,804) (13,804) (13,804) Estimated Fund Balance June 30, 2025 (1,138,404) (1,138,404) (1,192,404) (3,174) (1,192,404) 40,000 40,000 40,000 - - (40,000) 0% 40,000
476,916 476,916 476,916 242,599 242,599 (234,317) 51% 476,916 403,275 403,275 (34,500) 368,775 182,113 182,113 (186,662) 49% 368,775 [26] 433,117 433,117 433,117 156,595 156,595 (276,522) 36% 433,117 - - - - - - 0% -
29,218 29,218 29,218 - - (29,218) 0% 29,218
20,000 20,000 20,000 22,952 22,952 2,952 115% 20,000
7,000 7,000 7,000 - - (7,000) 0% 7,000
- - - - - - 0% -
6,000 6,000 6,000 - - (6,000) 0% 6,000
1,415,526 1,415,526 (34,500) 1,381,026 604,259 - 604,259 (776,767) 44% 1,381,026 67,000 67,000 67,000 - - (67,000) 0% 67,000
1,482,526 1,482,526 (34,500) 1,448,026 604,259 - 604,259 (843,767) 42% 1,448,026 683,669 863,669 (37,500) 826,169 350,514 50,000 400,514 425,654 48% 826,169 [27] [28] 1,355,889 1,355,889 (38,900) 1,316,989 581,377 50,000 631,377 685,612 48% 1,316,989 [29] 2,039,558 2,219,558 (76,400) 2,143,158 931,891 100,000 1,031,891 1,111,266 48% 2,143,158 (557,032) (737,032) 41,900 (695,132) (327,632) (100,000) (427,632) 267,500 62% (695,132) Fund Balance July 1, 2024 (2,226,679) (2,226,679) (2,226,679) 115,802 (2,226,679) Estimated Fund Balance June 30, 2025 (2,783,711) (2,963,711) (2,921,811) (211,831) (2,921,811) NOTES:
[20] Increase the revenue budget to account for donation from the West Contra Costa Youth Soccer League (WCCYSL) to renovate the soccer field. [21] Increase the revenue budget to account for a contribution for youth programs. [22] Increase the expenditure budget for: costs related the soccer field renovation ($167,050); increase related to recreation coordinator going from part-time to full-time ($13,500) [23] Increase the expenditure budget for increase related to recreation coordinator going from part-time to full-time ($13,500) [24] Increase the expenditure budget for increase related to recreation coordinator going from part-time to full-time ($13,500) [25] Increase the expenditure budget for: increase related to recreation coordinator going from part-time to full-time ($13,500); instructor payments to be paid from youth program contribution ($10,000). [26] Reduce review fees revenue budget related to CEQA studies. [27] Reduce expenditure budget for as implementation of the Housing Element notifications/materials anticipated to be less, and traffic studies and CEQA assistance which not needed this fiscal year.
Increase expenditure budget for continued support related to the online permitting system ($2,500). [28] Add one full-time Associate Planner. No fiscal impact as funds will be reallocated from contract planning services. [29] Reduce expenditure budget as less backfill is anticipated for permit techs, inspections, and building official.Increase expenditure budget for continued support related to the online permitting system ($2,500).
Fund: 209 - Recreation Fund
Division: 551- Recreation Administration
Division: 552- Senior Center
Division: 553- Tiny Tots
Division: 554- Youth Center
Division: 555- Day Camp
Division: 557- Swim Center
Division: 558- Memorial Hall
Division: 559- Tennis
Revenue Total:
Operating Transfers in:
Sources Total
Expenditures
Division: 117- General Government Total:
Division: 551- Recreation Administration Total:
Division: 552- Senior Center Total:
Division: 553- Tiny Tots Total:
Division: 554- Youth Center Total:
Division: 557- Swim Center Total:
Expenditures Total:
Recreation Fund Net Results:
Fund: 212 - Building & Planning
323- State Grants
332- Permits
341- Review Fees
342- Other Fees
343- Abatement Fees
344- Impact Fees
351- Fines and Forfeiture
370- Interest and Investment Income
383- Reimbursements
384- Other Revenue
Revenue Total:
Operating Transfers In:
Sources Total
Expenditures
Division: 461- Planning Total:
Division: 462- Building Inspection Total:
Expenditures Total:
Building & Planning Net Results:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
60,060 60,060 60,060 31,007 31,007 (29,053) 52% 60,060
6,000 6,000 6,000 90 90 (5,910) 2% 6,000
66,060 66,060 - 66,060 31,097 - 31,097 (34,963) 47% 66,060 -
187,102 187,102 187,102 70,764 70,764 116,338 38% 187,102 187,102 187,102 - 187,102 70,764 - 70,764 116,338 38% 187,102 (121,042) (121,042) - (121,042) (39,666) (39,666) 81,376 33% (121,042) Fund Balance July 1, 2024 31,420 31,420 31,420 31,420 31,420 Estimated Fund Balance June 30, 2025 (89,622) (89,622) (89,622) (8,246) (89,622) - - - - - - 0% -
8,000 8,000 8,000 41,551 41,551 33,551 519% 8,000
360,000 360,000 360,000 236,467 236,467 (123,533) 66% 360,000 368,000 368,000 - 368,000 278,018 - 278,018 (89,982) 76% 368,000 -
173,666 173,666 173,666 56,121 56,121 117,545 32% 173,666 - - - - - - 0% -
173,666 173,666 - 173,666 56,121 - 56,121 117,545 32% 173,666 194,334 194,334 - 194,334 221,897 - 221,897 27,563 114% 194,334 Fund Balance July 1, 2024 2,915,815 2,915,815 2,915,815 2,915,815 2,915,815 Estimated Fund Balance June 30, 2025 3,110,149 3,110,149 3,110,149 3,137,712 3,110,149 - - - 115,802 115,802 115,802 0% -
722,619 722,619 722,619 - - (722,619) 0% 722,619
421,638 421,638 421,638 - - (421,638) 0% 421,638
8,000 8,000 8,000 30,180 30,180 22,180 377% 8,000
1,152,257 1,152,257 - 1,152,257 145,982 - 145,982 (1,006,275) 13% 1,152,257 - - - - - - 0% -
201,919 201,919 201,919 66,609 66,609 135,310 33% 201,919 1,501,207 1,501,207 1,501,207 69,758 81,722 151,481 1,349,727 10% 1,501,207 2,000 2,000 2,000 - - 2,000 0% 2,000
1,705,126 1,705,126 - 1,705,126 136,368 81,722 218,090 1,487,036 13% 1,705,126 (552,869) (552,869) - (552,869) 9,615 (81,722) (72,107) 480,762 13% (552,869) Fund Balance July 1, 2024 2,357,194 2,357,194 2,357,194 2,357,194 2,357,194 Estimated Fund Balance June 30, 2025 1,804,325 1,804,325 1,804,325 2,366,809 1,804,325 - - - 3,072 3,072 3,072 0% -
- - - - - - 0% -
- - - - 3,072 - 3,072 3,072 0% -
- - - - - - 0% -
- - - 3,072 3,072 3,072 0% -
Fund Balance July 1, 2024 216,046 216,046 216,046 216,046 216,046 Estimated Fund Balance June 30, 2025 216,046 216,046 216,046 219,118 216,046 - - - 151 151 151 0% -
- - - 282 282 282 0% -
- - - - 434 - 434 434 0% -
20,544 20,544 20,544 - - 20,544 0% 20,544
20,544 20,544 - 20,544 - - - 20,544 0% 20,544
(20,544) (20,544) - (20,544) 434 434 20,978 -2% (20,544) Fund Balance July 1, 2024 18,835 18,835 18,835 18,835 18,835 Estimated Fund Balance June 30, 2025 (1,709) (1,709) (1,709) 19,268 (1,709) Fund: 213 - Refuse Management Fund
323- State Grants
370- Interest and Investment Income
Revenue Total:
Expenditures
Division: 346- Waste Reduction Total:
Expenditures Total:
Refuse Management Fund Net Results:
Fund: 214 - Solid Waste Fund
323- State Grants
370- Interest and Investment Income
383- Reimbursements
Revenue Total:
Expenditures
Division: 342- Road Maintenance Total:
Division: 345- Park Maintenance Total:
Expenditures Total:
Solid Waste Fund Net Results:
Fund: 215 - Measure C and J Fund
322- Fed Grant/Misc
323- State Grant/Misc
324- Other Grants
370- Interest and Investment Income
Revenue Total:
Expenditures
Division: 117- General Government Total:
Division: 341- Administration/Engineering Total:
Division: 342- Road Maintenance Total:
Division: 343- Facility Maintenance Total:
Expenditures Total:
Measure C and J Fund Net Results:
Fund: 216 - Rate Stabilization Fund
370- Interest and Investment Income
383- Reimbursements
Revenue Total:
Expenditures Total:
Rate Stabilization Fund Net Results:
Fund: 225 - Asset Seizure-Adjudicated Fund
351- Fines and Forfeiture
370- Interest and Investment Income
Revenue Total:
Expenditures
Division: 221- Police Operations Total:
Expenditures Total:
Asset Seizure-Adjudicated Fund Net Results:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
- - - 3,608 3,608 3,608 0% -
- - - - 3,608 - 3,608 3,608 0% -
- - - - - 0% -
- - - - 3,608 3,608 3,608 0% -
- - -
Fund Balance July 1, 2024 49,439 49,439 49,439 49,439 49,439 Estimated Fund Balance June 30, 2025 49,439 49,439 49,439 53,047 49,439 1,039,594 1,039,594 (1,039,594) 0 - - (0) 0% 0 [30]
- - - 49,810 49,810 49,810 0% -
1,039,594 1,039,594 (1,039,594) 0 49,810 - 49,810 49,810 12452582% 0 700,000 700,000 700,000 - - 700,000 0% 700,000
58,000 58,000 58,000 - - 58,000 0% 58,000
265,000 265,000 265,000 - - 265,000 0% 265,000
600,000 600,000 600,000 - - 600,000 0% 600,000
1,623,000 1,623,000 - 1,623,000 - - - 1,623,000 0% 1,623,000 (583,406) (583,406) (1,039,594) (1,623,000) 49,810 - 49,810 1,672,810 -3% (1,623,000) Fund Balance July 1, 2024 3,503,560 3,503,560 3,503,560 3,503,560 3,503,560 Estimated Fund Balance June 30, 2025 2,920,155 2,920,155 1,880,561 3,553,371 1,880,561 50,000 50,000 50,000 49,561 49,561 (439) 99% 50,000
- - - - - - 0 -
- - - - - - 0% -
- - - - - - 0% -
5,000 5,000 5,000 - - (5,000) 0% 5,000
55,000 55,000 - 55,000 49,561 - 49,561 (5,439) 90% 55,000 47,376 47,376 47,376 26,005 26,005 21,371 55% 47,376
275,867 275,867 275,867 69,959 69,959 205,908 25% 275,867 323,243 323,243 - 323,243 95,964 - 95,964 227,279 30% 323,243 (268,243) (268,243) - (268,243) (46,403) (46,403) 221,840 17% (268,243) Fund Balance July 1, 2024 8,267,770 8,267,770 8,267,770 8,267,770 8,267,770 Estimated Fund Balance June 30, 2025 7,999,527 7,999,527 7,999,527 8,221,367 7,999,527 56,411 56,411 56,411 32,758 32,758 (23,653) 58% 56,411
7,500 7,500 7,500 - - (7,500) 0% 7,500
63,911 63,911 - 63,911 32,758 - 32,758 (31,153) 51% 63,911 39,795 39,795 39,795 4,739 4,739 35,056 12% 39,795
45,380 45,380 45,380 3,835 3,835 41,545 8% 45,380
85,175 85,175 - 85,175 8,575 - 8,575 76,600 10% 85,175
(21,264) (21,264) - (21,264) 24,184 24,184 45,448 -114% (21,264) Fund Balance July 1, 2024 76,278 76,278 76,278 76,278 76,278 Estimated Fund Balance June 30, 2025 55,014 55,014 55,014 100,461 55,014 15,000 15,000 15,000 - - (15,000) 0% 15,000
15,000 15,000 - 15,000 - - - (15,000) 0% 15,000
14,942 14,942 14,942 - - 14,942 0% 14,942
14,942 14,942 - 14,942 - - - 14,942 0% 14,942
58 58 - 58 - - (58) 0% 58
Fund Balance July 1, 2024 (983) (983) (983) (983) (983) Estimated Fund Balance June 30, 2025 (925) (925) (925) (983) (925) NOTES:
[29] Remove revenue budget as the budgeted amounts carried forward from the prior fiscal year.
Fund: 226 - CASp Certification and Training Fund
342- Other Fees
Revenue Total:
Expenditures Total:
CASp Certification and Training Fund Net Results:
Fund: 276 - Growth Impact Fund
344- Impact Fees
370- Interest and Investment Income
Revenue Total:
Expenditures
Division: 343- Facility Maintenance Total:
Division: 344- NPDES Storm Drain Total:
Division: 345- Park Maintenance Total:
Division: 642- Sewer Collections Total:
Expenditures Total:
Growth Impact Fund Net Results:
Fund: 285 - Housing Land Held for Resale
370- Interest and Investment Income
383- Reimbursements
384- Other Revenue
392- Sale of Property
393- Loan/Bond Proceeds
Revenue Total:
Expenditures
Division: 461- Planning Total:
Division: 464- Housing Administration Total:
Expenditures Total:
Housing Land Held for Resale Net Results:
Fund: 310 - Lighting & Landscape Districts
321- Intergovernmental Taxes
383- Reimbursements
Revenue Total:
Expenditures
Division: 347- Landscape & Lighting PVR North Total:
Division: 348- Landscape & Lighting PVR South Total:
Expenditures Total:
Lighting & Landscape Districts Net Results:
Fund: 317 - Pinole Valley Caretaker Fund
381- Rental Income
Revenue Total:
Expenditures
Division: 345- Park Maintenance Total:
Expenditures Total:
Pinole Valley Caretaker Fund Net Results:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
60,000 60,000 60,000 - - 60,000 0% 60,000
10,000 10,000 10,000 - - 10,000 0% 10,000
70,000 70,000 - 70,000 - - - 70,000 0% 70,000
(70,000) (70,000) - (70,000) - - 70,000 0% (70,000)
Fund Balance July 1, 2024 541,649 541,649 541,649 541,649 541,649 Estimated Fund Balance June 30, 2025 471,649 471,649 471,649 541,649 471,649 41,394 41,394 41,394 18,055 18,055 (23,339) 44% 41,394
- - - - - - 0% -
1,773,289 1,773,289 1,773,289 154,817 154,817 (1,618,472) 9% 1,773,289 - - 279 279 279 0% -
- - - - - - 0% -
1,814,683 1,814,683 - 1,814,683 173,152 - 173,152 (1,641,531) 10% 1,814,683 250,000 250,000 250,000 250,000 250,000 - 100% 250,000
2,064,683 2,064,683 - 2,064,683 423,152 423,152 (1,641,531) 20% 2,064,683 3,687,304 3,687,304 3,687,304 28,192 133,319 161,511 3,525,793 4% 3,687,304 3,687,304 3,687,304 - 3,687,304 28,192 133,319 161,511 3,525,793 4% 3,687,304 (1,622,621) (1,622,621) - (1,622,621) 394,960 (133,319) 261,640 1,884,261 -16% (1,622,621) Fund Balance July 1, 2024 2,051,278 2,051,278 2,051,278 2,051,278 2,051,278 Estimated Fund Balance June 30, 2025 428,657 428,657 428,657 2,446,238 428,657 - - - - - - 0% -
- - - - - - - - 0% -
250,000 250,000 250,000 250,000 250,000 - 100% 250,000
250,000 250,000 - 250,000 250,000 - 250,000 - 100% 250,000 895,000 895,000 895,000 - 618 618 894,382 0% 895,000
895,000 895,000 - 895,000 - 618 618 894,382 0% 895,000
(645,000) (645,000) - (645,000) 250,000 (618) 249,382 894,382 -39% (645,000) Fund Balance July 1, 2024 1,003,071 1,003,071 1,003,071 1,003,071 1,003,071 Estimated Fund Balance June 30, 2025 358,071 358,071 358,071 1,253,071 358,071 10,164,403 10,164,403 10,164,403 4,650,317 4,650,317 (5,514,087) 46% 10,164,403 200,000 200,000 200,000 259,019 259,019 59,019 130% 200,000 - - - 16,541 16,541 16,541 0% -
- - - - - - 0% -
- - - - - - 0% -
10,364,403 10,364,403 - 10,364,403 4,925,877 - 4,925,877 (5,438,526) 48% 10,364,403 - - - 7,361 7,361 (7,361) 0% -
11,911,529 11,911,529 11,911,529 2,350,865 359,669 2,710,534 9,200,995 23% 11,911,529 24,163,267 24,163,267 24,163,267 546,487 1,094,978 1,641,465 22,521,802 7% 24,163,267 85,000 85,000 85,000 - - 85,000 0% 85,000
1,611,568 1,611,568 1,611,568 445,087 445,087 1,166,481 28% 1,611,568 37,771,365 37,771,365 - 37,771,365 3,349,799 1,454,647 4,804,447 32,966,918 13% 37,771,365 (27,406,962) (27,406,962) - (27,406,962) 1,576,077 (1,454,647) 121,430 27,528,391 0% (27,406,962) Fund Balance July 1, 2024 21,657,361 21,657,361 21,657,361 21,657,361 21,657,361 Estimated Fund Balance June 30, 2025 (5,749,601) (5,749,601) (5,749,601) 23,233,438 (5,749,601) Fund: 324 - Public Facilities Fund
Expenditures
Division: 343- Facility Maintenance Total:
Division: 345- Park Maintenance Total:
Expenditures Total:
Public Facilities Fund Net Results:
Fund: 325 - City Street Improvements
322- Federal Grants
323- State Grants
324- Other Grants
332- Permits
383- Reimbursements
Revenue Total:
Operating transfers in Total:
Sources Total:
Expenditures
Division: 342- Road Maintenance Total:
Expenditures Total:
City Street Improvements Net Results:
Fund: 377 - Arterial Streets Rehabilitation Fund
322- Federal Grants
Revenue Total:
Operating transfers in Total:
Sources Total:
Expenditures
Division: 342- Road Maintenance Total:
Expenditures Total:
Arterial Streets Rehabilitation Fund Net Results:
Fund: 500 - Sewer Enterprise Fund
363- Sewer Enterprise Charges
370- Interest and Investment Income
383- Reimbursements
384- Other Revenue
392- Proceeds from Sale of Property
Revenue Total:
Expenditures
Division: 117- General Government Total:
Division: 641- Sewer Treatment Plant/Shared Total:
Division: 642- Sewer Collections Total:
Division: 643- Sewer Projects/Shared Total:
Division: 644- WPCP Equipment/Debt Service Total:
Expenditures Total:
Sewer Enterprise Fund Net Results:
Projected
Year-End Notes
Second Quarter Financial Summary by Fund
City of Pinole, CA For FY2024/25 Period Ending: 12/31/24 Variance
Favorable
(Unfavorable)
Original
Budget Revised Budget
Proposed
Adjustments Amended Budget YTD Actual Encumbrances Total Percent
Used
26,486 26,486 26,486 7,258 7,258 (19,228) 27% 26,486
179,047 179,047 179,047 72,972 72,972 (106,075) 41% 179,047 - - - - - - 0% -
3,000 3,000 3,000 - - (3,000) 0% 3,000
208,533 208,533 - 208,533 80,230 - 80,230 (128,303) 38% 208,533 160,000 160,000 160,000 160,000 160,000 - 100% 160,000
368,533 368,533 - 368,533 240,230 - 240,230 (128,303) 65% 368,533 -
829,463 833,883 (85,000) 748,883 301,330 301,330 447,553 40% 748,883 [31] 829,463 833,883 (85,000) 748,883 301,330 - 301,330 447,553 40% 748,883 (460,930) (465,350) 85,000 (380,350) (61,100) - (61,100) 319,250 16% (380,350) Fund Balance July 1, 2024 2,120 2,120 2,120 2,120 2,120 Estimated Fund Balance June 30, 2025 (458,809) (463,229) (378,229) (58,979) (378,229) - - - - - - - 0% -
- - - - - - - - 0% -
1,572,339 1,572,339 34,230 1,606,569 735,595 142,147 877,742 728,827 55% 1,606,569 [32] [33] 1,572,339 1,572,339 34,230 1,606,569 735,595 142,147 877,742 (728,827) 55% 1,606,569 (1,572,533) (1,572,533) (34,230) (1,606,763) (735,595) (142,147) (877,742) 729,021 55% (1,606,763) (194) (194) - (194) (0) (0) (0) 194 0% (194)
Fund Balance July 1, 2024 (3,129) (3,129) (3,129) (3,129) (3,129) Estimated Fund Balance June 30, 2025 (3,323) (3,323) (3,323) (3,129) (3,323) 700,000 700,000 700,000 504,709 504,709 (195,291) 72% 700,000 700,000 700,000 - 700,000 504,709 - 504,709 (195,291) 72% 700,000 50,000 50,000 50,000 36,022 36,022 13,978 72% 50,000
2,425,000 2,425,000 2,425,000 - - 2,425,000 0% 2,425,000 2,475,000 2,475,000 - 2,475,000 36,022 36,022 (2,438,978) 1% 2,475,000 (1,775,000) (1,775,000) - (1,775,000) 468,687 468,687 2,243,687 -26% (1,775,000) Fund Balance July 1, 2024 13,585,182 13,585,182 13,585,182 13,585,182 13,585,182 Estimated Fund Balance June 30, 2025 11,810,182 11,810,182 11,810,182 14,053,869 11,810,182 NOTES:
[30] Reduce revenue budget as the budgeted amounts carried forward from the prior fiscal year. [31] Reduce expenditure budget as the PCTV master plan will be done in house ($25,000) and studio live truck cameras will not be replaced ($60,000) this fiscal year. [32] Increase the budget to carry forward the Stancil Multi Channel Voice Logging Recorder System ($19,230) and costs related to the online permitting system ($15,000). [33] Add one full-time IT Manager as part of the plan to bring the IT function in house. No fiscal impact as funds will be reallocated from contract IT services.
Fund: 505 - Cable Access TV
314- Franchise Taxes
365- Cable TV Charges
370- Interest and Investment Income
384- Other Revenue
Revenue Total:
Operating transfers in Total:
Sources Total
Expenditures
Division: 119- Cable Access TV Total:
Expenditures Total:
Cable Access TV Net Results:
Fund: 525 - Information Systems
399- Operating Transfers In
Sources Total:
Expenditures
Division: 118- Information Systems Total:
Expenditures Total:
Indirect cost allocations Total:
Information Systems Net Results:
Fund: 700 - Pension Fund
370- Interest and Investment Income
Revenue Total:
Expenditures
Division: 115- Finance Total:
Transfers Out Total:
Expenditures Total:
Pension Fund Net Results:
RESOLUTION NO. 2025-xx
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PINOLE
COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA,
AMENDING THE CITY BUDGET FOR FISCAL YEAR 2024/25
WHEREAS, the City Council did adopt a Budget for City Operations by Resolution number 2024-51 on June 25, 2024; and
WHEREAS, the Finance Director has presented proposed
recommendations for amendment of the Adopted Fiscal Year 2024/25 Operating and Capital Budget as part of a Mid-Year Budget Review at the regular City Council Meeting held on March 4, 2025; and
WHEREAS, the City Council has considered these recommended changes, as to the matter of the City budget; and
WHEREAS, the City Council has solicited public input on the proposed amendments to the Fiscal Year 2024/25 Operating and Capital Budget.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Pinole as follows:
Amendments to the budget and program of services for the City of Pinole for Fiscal Year 2024/25 commencing July 1, 2024 and ending June 30, 2025 are hereby approved and adopted, as set forth in Exhibit #1 (herein incorporated).
PASSED AND ADOPTED this 4th day of March 2025, by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ABSTAIN: COUNCILMEMBERS:
I hereby certify that the foregoing resolution was introduced, passed and adopted on this 4 th day
of March, 2024.
______________________________________
Heather Bell, CMC
City Clerk
Mid-Year Budget Adjustments Exhibit 1
Total Proposed
Adjustments
General Fund (Fund 100)
Revenues $ (93,319)
Expenditures (261,840)
Measure S 2006 Fund (Fund 105)
Revenues (31,000)
Measure S 2014 Fund (Fund 106)
Revenues (31,000)
Expenditures 150,000
Measure I 2024 Fund (Fund 107)
Revenues 600,000
Equipment Reserve Fund (Fund 160)
Expenditures 92,891
Recreation Fund (Fund 209)
Revenues 177,050
Expenditures 231,050
Building and Planning Fund (Fund 212)
Revenues (34,500)
Expenditures (76,400)
Growth Impact Fund (Fund 276)
Revenues (1,039,594)
Cable Access TV Fund (Fund 505)
Expenditures (85,000)
Information Systems Fund (Fund 525)
Indirect Cost Allocations (34,230)
Expenditures $ (34,230)
Mid-Year Position Changes
Reclassify Human Resources Technician to Human Resources Specialist Change Recreation Coordinators from part-time to full-time Add Associate Planner