PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #12.A

SUBJECT/TITLE:

PUBLIC SAFETY FACILITY UPDATE, DIRECTION, AND AMENDMENT #1 TO

AGREEMENT WITH MARY MCGRATH ARCHITECTS FOR PROFESSIONAL

SERVICES

RECOMMENDATION:

1. Adopt a Resolution authorizing the City Manager to execute Amendment #1 to the existing Professional Services Agreement with Mary McGrath Architects for Criteria and Bridging Documents for the Police and Fire Public Safety Facility in the amount of $116,400;

2. Provide additional direction to staff if desired.

BACKGROUND:

At the January 4, 2022, and January 25, 2022, City Council Meetings, staff received direction to provide the City Council with additional information related to the Public Safety Facility. The City Council requested that proposals for two project design options be requested from Design-Build Entity teams. The City Council also requested additional information on the turning radius and traffic control impacts because of the fire apparatus exit location on a diagonal and the proximity of Judkins Middle School. Staff has since received the necessary proposals and studies for consideration by the City Council.

Contract Amendment for Option B
On October 19, 2021, the City Council awarded a contract to Mary McGrath Architects for Criteria and Bridging Documents for the Police and Fire Public Safety Facility. Based on additional design work requested by the architect team, and direction by the City Council to prepare an additional option (known as Option B) for the prequalified Design- Build Entity teams to prepare as submittals, an amendment to the contract has been prepared.

The proposed contract Amendment #1 (Attachment 1.A) will cover the additional cost to complete both Option A (the original concept consisting of a single integrated Police and Fire facility) and the requested Option B (an alternative concept that would result in separate Police and Fire facilities, with less remodel work done on Police facilities) Criteria and Bridging Documents. Additionally, staff has requested a scope of work for Construction Document Review for the documents submitted by the selected Design- Build Entity to ensure that it is in conformance with the Criteria and Bridging documents and the design intent of the City Council.

Turn Radius and Traffic Control Study
At the January 25, 2022, City Council Meeting, staff received direction to obtain a Turn Radius and Traffic Control Study from a third-party firm. The existing project concept, as previously approved, includes the egress of fire apparatus (engines) on a diagonal trajectory into the intersection of Bello Street and Wadsworth avenue. The goal of the

12.A-1Council Agenda 3-15-2022

study was to determine if the diagonal exit would allow for the requisite turn radius for the fire apparatus, as well as to determine the necessary traffic control devices that would be required for such an exit. Additionally, staff received direction to evaluate the same considerations for an exit from the fire station onto Wadsworth Avenue at approximately 150 feet east of Bello Street.

Staff procured services from GHD, an engineering firm with expertise necessary to complete the study. Based on the results of the Turn Radius Study (Attachment 2), it has been confirmed that both the originally planned diagonal exit as well as the alternative exit would have sufficient turning radius to effectively deliver service to all parts of the community upon exit of the apparatus bay. The turn radius study was conducted with the currently specified equipment, using a “fixed base exit”. This provides for the maximum tolerance of equipment exiting straight from either of the outermost bays. In a real-world scenario, the fire engineers would utilize the driveway apron to create the safest and most efficient exit, however staff wanted to ensure that in a “worst-case” scenario, the equipment could effectively exit the fire station.

The second component of the study related to the traffic control devices that would be required. The study found that the diagonal exit was estimated to impact the intersection for up to 18 seconds, while the Wadsworth Avenue exit would delay response time by up to 25 seconds. In terms of traffic control devices, GHD and Cal Fire both recommended an Emergency Beacon notification system like those on Shell Beach Road adjacent to Fire Station 63 for consistency in the community. The attached study outlines the recommend traffic control devices based on the preliminary layout for the fire station. The study will be provided to the Design-Build Entities as a reference document, but it will ultimately be a requirement of the submittal documents to outline the traffic control devices necessary for the final approved design.

Recommendation and Next Steps
Staff recommends the Council adopt a Resolution (Attachment 1) authorizing the City Manager to execute Amendment #1 (Attachment 1.A) to the existing Mary McGrath Architects contract to allow Mary McGrath Architects to complete the Bridging and Criteria Documents, for the Public Safety Facility project.

FISCAL IMPACT:

The fiscal impact of approving the attached Resolution is $116,400. The FY 2022 Capital Projects Fund Public Safety Facility project budget includes sufficient budget to support this amendment.

ALTERNATIVES:

1. Decline approval of Amendment #1 and provide staff with direction on how to proceed.

12.A-2Council Agenda 3-15-2022

ATTACHMENTS:

1. Resolution

1.A Exhibit A to Resolution: Proposed Amendment #1

2. Turning Radius and Traffic Control Study
Submitted by: Meeting Date: March 15, 2022
Jorge Garcia, Assistant City Manager
City Manager Approval:

12.A-3Council Agenda 3-15-2022

RESOLUTION NO. R-2022-XXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PISMO BEACH, CALIFORNIA AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT #1

TO THE EXISTING PROFESSIONAL SERVICES AGREEMENT WITH MARY

MCGRATH ARCHITECTS FOR PREPARATION OF CRITERIA AND BRIDGING

DOCUMENTS FOR THE POLICE AND FIRE PUBLIC SAFETY FACILITY IN THE AMOUNT OF $116,400
WHEREAS, on October 19, 2021, Council awarded a contract to Mary McGrath Architects for preparation of Criteria and Bridging Documents for the Police and Fire Public Safety Facility; and
WHEREAS, on January 25, 2022, the City Council directed staff to obtain proposals from Design-Build Entities for both the originally-planned “Option A” (a fully integrated joint Police and Fire facility) and alternate “Option B” (separate facilities consisting of a new Fire facility and limited renovation of the Police facility); and WHEREAS, the proposed contract Amendment #1 will provide for additional scope of work to complete Option A documents, Option B criteria and bridging documents, and construction document review services; and
WHEREAS, Mary McGrath Architects and their subconsultants have the requisite knowledge and experience in essential services facilities to ensure the selected Design- Build Entity has submitted construction documents in conformance with the Bridging Documents and design intent of the City; and
WHEREAS, the FY 2022 Capital Projects Fund Public Safety Facility project budget includes sufficient budget to support this amendment.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pismo Beach hereby authorizes the City Manager to execute Amendment #1 (Exhibit A) to the existing Professional Services Agreement with Mary McGrath Architects for Criteria and Bridging Documents for the Police and Fire Public Safety Facility in the amount of $116,400.

UPON MOTION OF Council Member , seconded by Council Member , the foregoing resolution was adopted by the City Council of the City of Pismo Beach this 15th day of March 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

RECUSED:

Attachment 1

12.A-4Council Agenda 3-15-2022

Approved: Attest:
________________________ ________________________
Ed Waage, Mayor Erica Inderlied, City Clerk
Attachment 1

12.A-5Council Agenda 3-15-2022

AMENDMENT # 1
to the
OCTOBER 19, 2021 AGREEMENT BETWEEN THE CITY OF PISMO BEACH

AND MARY MCGRATH ARCHITECTS

Pursuant to the October 19, 2021 Agreement for Professional Services between the City of Pismo Beach, hereinafter referred to as “City,” and Mary McGrath Architects, hereinafter referred to as “Vendor,” City and Vendor hereby agree as follows:

1. Additional services shall be performed as set forth in the proposals dated February 24, 2022 and February 28, 2022, which are attached hereto and by this reference made a part hereof.

2. Compensation for the timing of the additional services shall be set forth in the referenced proposal. Compensation for the additional services shall not exceed the amount of one hundred sixteen thousand four hundred dollars ($116,400), without prior written approval of the City.

3. The revised feed under the October 19, 2021 contract, plus addendum 1, is two hundred six thousand nine hundred dollars ($206,900).

4. All other provisions of the Criteria and Bridging Documents for the Police and Fire Public Safety Facility agreement between City and Vendor shall remain in full force and effect.

CITY:

City of Pismo Beach, a Municipal Corporation

Signed:

Name: Jorge Garcia
Title: Assistant City Manager
Dated: ________________________________

Signed:

Name: James R. Lewis
Title: City Manager
Dated: ________________________________

ATTEST:

Signed:

Name: Erica Inderlied
Title: City Clerk

APPROVED AS TO FORM:

Signed:

Name: David M. Fleishman
Title: City Attorney
VENDOR:

Mary McGrath Architects

Signed:

Name: ________________________________
Title: _________________________________
Dated: ________________________________

Address for giving notice:
(if changed from prior agreement)
______________________________________
______________________________________

Email address for official communications:
(if changed from prior agreement)
______________________________________

Vendor Representative:
(if changed from prior agreement)
Name/Title: ____________________________

Attachment: Scope/Cost Proposal
Attachment 1.A

12.A-6Council Agenda 3-15-2022

Jorge Garcia
Assistant City Manager
City of Pismo Beach
760 Mattie Road
Pismo Beach, California 93449
Feburary 24, 2022
RE:   Pismo Beach Fire & Police Station Bridging Documents – Option B and Expanded Scope Option A
Dear Jorge:

Mary McGrath Architects (MMA) in Association with Manns Woodward Studios, Inc. (MWS) is pleased to present our proposal for the completion of Option B as presented in the attached concept documents.

We have composed the following scope of work based upon the direction received form the City of Pismo Beach Project team.  We have tailored this scope of work to develop both options equally and reuse as much information developed in Option A as possible in the refinement of Option B.  The proposal for Option B is additive to Option A and depends on reusing similar work project The total added fee proposal for the expanded scope of Option A is $7,500 and the total proposed fee for the further development of Option B is $61,300 for a total contract amendment of $68,800.  A task level breakdown of the fee for Option B is located at the end of the scope document.  Please let us know if you have any questions regarding the scope and fee included herein.  Thank you for the opportunity to continue to serve the City of Pismo Beach on this important public safety project.

Respectfully Submitted,
Mary McGrath, President
Mary McGrath Architects
CA No.  C24435
E:   [email protected]
P:   510‐565‐0300 (direct)
Attachment 1.A

12.A-7Council Agenda 3-15-2022

PROJECT UNDERSTANDING
The design team has been requested to provide additional services for an alternate design option for the Pismo Beach Public Safety Building.  All work associated with the original design options, referred to as Option A, shall remain as originally contracted.  The design for the new scope of work shall be referred to as Option B.

Both Option A and Option B shall be prepared as two complete and separate deliverable packages. Each package shall consist of separate building program worksheets, room component diagrams and room data worksheets, concept floor plans/bubble diagrams, site plans/diagrams, Architectural narratives, MEP narratives, Structural narratives, and outline specifications.

OPTION A:

1.) BRIEF DESCRIPTION OF SCOPE:  This option consists of the master planning of a combined Public Safety Building including all program spaces for the Fire operations, Police operations and shared public spaces. It is understood that the existing Police Station (approximately 8,300 gsf) shall receive major renovations and be designed to tie into the new construction to provide a single cohesive building with one centralized entrance located at the shared public spaces.  The police program shall have visual oversight of the public access/entrance. The façade of this building shall reuse the façade of the existing school which is slated to be demolished to allow for construction of the new building.
a.Additionally, there is a separate existing 3‐bay Fire Station (approximately 2,500 gsf) located partially in front of the existing Police Station. This building shall generally remain undisturbed, however minor interior renovations shall occur consisting of modifications to storage spaces to be used by the Police. No exterior work is anticipated.

OPTION B:

1.) DESCRIPTION OF SCOPE:  This option consists of the master planning of two separate buildings (Building 1 and Building 2); creating a Public Safety Campus. a.Building 1 shall consist of all program spaces for the fire operations and the shared public spaces. The façade of this building shall reuse the façade of the existing school which is slated to be demolished to allow for construction of the new building. b.Building 2 shall consist of all program spaces for police operations. This building will consist of interior renovations and an addition to the existing Police Station building. The existing station is approximately 8,300 gsf. It is anticipated that the structure and exterior of the existing building will remain unchanged with the exception of the areas of the building receiving the proposed addition.  It is anticipated that the addition will consist of approximately 2,200 to 2,500 gsf of new program spaces and shall generally be located on the south‐east side of the existing station.
c.Identical to Option A, there is a separate existing 3‐bay Fire Station (approximately 2,500 gsf) located partially in front of the existing Police Station. This building shall generally remain  undisturbed,  however  minor  interior  renovations  shall  occur  consisting  of modifications to storage spaces to be used by the Police. No exterior work is anticipated.

Attachment 1.A

12.A-8Council Agenda 3-15-2022

OPTION B – WORK PLAN & ASSOCIATED TASKS
TASK 1 – PROJECT INITIATION

1.) PROGRAMMING VALIDATION
Based on the programming efforts associated with Option A, we will meet with Owner to validate which program spaces shall be associated with Building 1 and Building 2. It is anticipated that there will be some duplication of program spaces as required to have two separately functioning buildings.

TASK 2 – PRELIMINARY SITE & BUILDING INVESTIGATIONS

1.) PRELIMINARY BUILDING UTILIZIATION
We  will  review  the  proposed  program  spaces  associated  with  each  building  to  ensure  the programmed spaces fit with the proposed building and site footprints.

2.) SITE DIAGRAM REFINEMENT
We will review the site plan to graphically depict the approximate proposed footprint of both buildings and associated drive aisles, response/return aprons, and parking and with the Owner to validate all vehicular maneuvering clearances are adequately accounted for.

TASK 3 – INITIAL CONCEPT PLANNING

1.) PRELIMINARY CONCEPT PLANNING
Our team will meet with Owner to discuss the selected refined site diagram in detail and address comments  generated  during  the  previous  meetings.    We  will  develop  conceptual  level  bubble diagrams depicting room sizes and associated adjacencies. Our team will create, based upon these discussions, a series of refined architectural concept site plans, and refined floor plan bubble diagrams for the two buildings that demonstrate the validity of the project program of requirements.

TASK 4 – SCHEMATIC DESIGN

1.) PROJECT NARRATIVE AND REPORT
Our team will develop a preliminary project narrative outlining the technical requirements associated with the anticipated future scope of work.  The narrative will include all applicable information obtained during the study and outline the intended quality of work to take place during future design phases and construction.

2.) FINAL FLOOR PLANS & SITE RENDERINGS
Our team will issue final refined floor plan diagrams and site diagrams of the project satisfying all previously agreed upon commentary.  Plans will be colored and include diagrammatic language as necessary to explain the critical functionality of spaces.

TASK 5 – FINAL DELIVERABLES

1.) BRIDGING DOCUMENTS
Our team will prepare a final package incorporating all relevant schematic design comments.  The Bridging document package will be developed with the intent of clearly communicating the project requirements to prospective design build contractors.  Deliverables will include:
a.Project Program
b.Executive Summary
Attachment 1.A

12.A-9Council Agenda 3-15-2022

c.Schematic Level Floor Plan Bubble Diagrams
d.Schematic Level Finish Diagrams
e.Schematic Level Massing Studies
f.Project Narrative & Diagrams Outlining:
i.Architectural Requirements (MMA and MWS)
ii.Structural Requirements (CSEG)
iii.MEP Requirements (EDesignC)
iv.A/V Requirements (MWS)
v.CCTV, Access Control, Security Requirements (MWS and City Consultant) vi.Ballistic Requirements (MWS)
vii.Special Equipment Requirements (MWS and City Consultant) g.Concept Architectural Site Plans
h.Civil Engineering Storm Drain Requirements (Above Grade Engineering) i.Site Utility Requirements (Above Grade Engineering)
All work shall be provided in .pdf format and native files.

OPTION B FEE SUMMARY
ATTACHMENTS: OPTION A AND B – SITE PLAN AND BUILDING 2 ZONING DIAGRAMS Total Fee:

Task 1 Project Initiation $3,000
Task 2 Preliminary Site and Building Investigations $9,250 Task 3 Initial Concept Planning $10,750
Task 4 Schematic Design, Project Narrative Report $16,700 Task 5 Bridging Documents $21,600
Professional Services Fee:$61,300
Attachment 1.A

12.A-10Council Agenda 3-15-2022

Jorge Garcia
Assistant City Manager
City of Pismo Beach
760 Mattie Road
Pismo Beach, California 93449
February 28, 2022
RE:   Pismo Beach Fire & Police Station– Construction Document Review Services Dear Jorge:

Mary McGrath Architects (MMA) in Association with Manns Woodward Studios, Inc. (MWS) is pleased to present our proposal for construction document review services. Our team will review the materials prepared by the selected Design Build Team for conformance with the Bridging Documents and design intent. Please see the following  task description and hours/rate summary.

Please contact  me with any questions or comments.

Respectfully,
Mary McGrath
President
Mary McGrath Architects
License No. C24435
Attachment 1.A

12.A-11Council Agenda 3-15-2022

SCOPE OF WORK
Task 1:  Construction Document Review/Design Intent Review Approach:

This scope of work provides consultation by the bridging team by reviewing the selected Design‐ Build Team designs and construction document development. The construction documents are reviewed to validate compliance with the Bridging Document design intent. We anticipate that there  will  be  both  informal  and  formal  design  review  stages.  Our  approach  is  to  work collaboratively with the design/build team to understand their approach for meeting the required scope and quality and providing direction where necessary. We anticipate 4–6‐month process for the development of the construction documents and have anticipated a total of 6 virtual team meetings.

Deliverables and Meetings:

1.During the construction document phase, we will meet with the D/B team during the initial stages of the CD development and provide formal reviews of the 50% and 90% submissions.

2.Act  as  liaison  between  City  Design  Team,  the  selected  Design‐Build  team  architect  and engineers,  and  the  stakeholders  to  assure  design  intent  compliance. Provide written documentation of review comments.

3.Meet monthly with the City Design Team to report findings and present review comments.

HOURLY FEE SUMMARY
Task 1
Construction Documents
Review/Design Intent Review
Mary McGrath
Architects/MWS
Principal
in Charge
(Mary, Gary
or Rob)Totals
rate $195
hours 60
total amount $11,700 $11,700
Consultant Struct. MEP Civil Totals
Rate (Average) $  190.00   $     185.00   $     185.00
Hours 50 80 40
total amount $9,500 $14,800 $7,400 $31,700
Task 1 $43,400
Total Estimated Hourly Fee:

Task 1 $55,100
$55,100
$2,204
Reimbursable expenses would include travel expenses, printing and report publishing.

Construction Documents
Review/Design Intent Review
Attachment 1.A

12.A-12Council Agenda 3-15-2022

The Power of Commitment
12574500 1
March 03, 2022
To Ben Fine, Director of Public Works Email [email protected] From Jake Hudson, Sr. Trans. Plnr/Engr Ref. No.12574500 Subject DRAFT Site Study for Public Safety Center Plan Expansion Site

1. Executive Summary
The City of Pismo Beach commissioned GHD to study access geometrics for the proposed Public Safety Center. The scope of the study included analysis of two potential access points and the turning radii of fire apparatus given the surrounding roadway geometry and current/forecasted future traffic volumes. This study also assessed the likely roadway reconstruction necessary to accommodate either driveway.

Due to the street widths on Wadsworth & Bello, fire apparatus would track into parking lanes from either driveway location, therefore its recommended that parking be restricted at various locations so as not to obstruct exiting fire apparatus.

During the AM peak hour, the intersection of Bello & Wadsworth operates below City level of service standards and experiences vehicle queues of up to 166’ from the intersection. Under Option 1: Bello & Wadsworth intersection drivewayNB Bello queues will temporarily obstruct exiting apparatus and are estimated to delay response times by up to 18 seconds. Under Option 2: Wadsworth drivewayWB Wadsworth queues will temporarily obstruct exiting apparatus and are estimated to delay response times by up to 25 seconds for apparatus turning WB to proceed thru the Bello & Wadsworth intersection. There are a number of options to offset these delays:

1. Parking could be restricted along Wadsworth & Bello providing area for queued vehicles to pull over and allow fire apparatus to pass.

2. Emergency Hybrid-Signals could be installed on WB Wadsworth and NB Bellow in advance of the intersection, during an emergency response the beacons would prevent vehicles from queuing at the intersection.

3. The intersection of Bello and Wadsworth could be signalized with emergency vehicle preemption allowing queues obstructing fire apparatus to clear the intersection.

Keep clear pavement markings are also recommended, however only under the Wadsworth driveway option.

ItV recommended that a 80’-90’ keep clear area be established at that driveway. This would cause maximum queue lengths to extend up to 260’. Keep clear pavement markings under the diagonal Bello & Wadsworth driveway RSWLRQare not recommended as they would conflict with the stop controls.

Attachment 2

12.A-13Council Agenda 3-15-2022

12574500 2

2. Turning Radius Assessment
To evaluate turning movements from the proposed driveways, GHD scaled conceptual drawings of the safety site center to approximate the proposed driveway location and size. GHD also obtained manufacturer specifications on the design of planning emergency vehicle apparatus. Using these specifications (noted in the exhibits), GHD prepared turning movement diagrams for the proposed driveway at the corner of Bello St and Wadsworth Ave and the alternative driveway location 150’ north of Bello St on Wadsworth Ave. GHD assessed turning movements from various starting positions within the driveway. Two figures below represent potential exit positions from the apparatus bay.

2.1 Wadsworth & Bello Driveway
Turning movements from a diagonal driveway at Wadsworth & Bellow would track over the SB Wadsworth Lane while attempting to go Northbound on Wadsworth. Apparatus in the right position of the driveway would track over on the opposite side of the street when traveling Northbound on Wadsworth. Apparatus in the left position of the driveway would not track over sidewalk on the opposite side of the street when traveling Eastbound on Bello.

Apparatus starting from the centerline of the driveway would have least amount of tracking over opposing travel lanes. Apparatus left or right of the center positions would more likely track over the opposite street lane while attempting to go Northbound on Wadsworth.

Centerline of driveway
right
left
Attachment 2

12.A-14Council Agenda 3-15-2022

12574500 3

2.2 Wadsworth Driveway
Turning movements from the second driveway option at the north end of the site would accommodate the trailing rear wheels turning movements from this access point without tracking over the opposite sidewalk for either the right or left side of the driveway based on the driveway width as shown.

In all cases parking removal along Wadsworth and Bello would be necessary to accommodate apparatus turning movements.

The exhibits are listed and shown below:

Truck Turning Exhibits
x Figure A: Truck Turn – Option 1 (Right Position)
x Figure B: Truck Turn – Option 1 (Left Position)
x Figure C: Truck Turn – Option 2 (Right Position)
x Figure D: Truck Turn – Option 2 (Left Position)
left
right
Attachment 2

12.A-15Council Agenda 3-15-2022

The Power of Commitment
12574500 4
Attachment 2

12.A-16Council Agenda 3-15-2022

12574500 5
Attachment 2

12.A-17Council Agenda 3-15-2022

12574500 6
Attachment 2

12.A-18Council Agenda 3-15-2022

12574500 7
Attachment 2

12.A-19Council Agenda 3-15-2022

The Power of Commitment
12574500 7

3. Intersection and Queueing Operations
In addition to the overall roadway and driveway geometrics, traffic operations and congestion around the proposed access points also affect emergency response from the site. GHD evaluated intersection operations and queueing at the intersection of Wadsworth & Bellow in addition to geometrics.

3.1 Data Collection
Turning movement counts were collected on-site February 03, 2022. The study intersection was analyzed during the weekday AM and PM peak hour periods, during the morning drop off at the nearby school, and during the PM peak hour commute from 4 pm to 6 pm. Future volumes were obtained from the City’s Draft Circulation Element and the Pismo Beach Travel Demand Model.

3.2 Existing Intersection Analysis
The Existing conditions scenario represents baseline traffic conditions. Existing weekday AM & PM peak hour intersection operations were quantified using on-site traffic volumes and intersection lane geometrics and control. Table 1 presents the current LOS operations for the intersection. Figure 1 below illustrates the peak hour volumes.

Table 1 Existing LOS Operation
Intersection Control
Type
Target
LOS
AM Peak Hour PM Peak Hour
Delay LOS Delay LOS
Bello St / Wadsworth Ave AWSC C 15.4 D 8.8 A

1. LOS = Delay average of all approaches for AWSC
As presented in Table 1, the intersection is currently operating at acceptable LOS “C” OR better during Existing conditions.

3.3 Existing Queue Analysis
The results of the intersection operational analysis include an estimate of the 95th percentile and max queue lengths. The existing storage capacity (where applicable) and the calculated 95th percentile and max queue lengths are presented in Table 2. The storage capacities reported in Table 2 are based on measurements from available aerial photographs. Calculated 95th or max queue lengths that exceed the storage capacity are indicated in bold type.

Table 2 Existing Intersection Queueing Summary
Intersection Existing Storage *
Capacity
Calculated 95th and Max Percentile Queue Length (ft.)
95th Percentile Max Percentile
Approach AM PM AM PM
Bello St / Wadsworth Ave
EB Wadsworth 370 106 67 127 68
WB Wadsworth 725 111 55 166 78
NB Bello 500 65 53 79 73
SB Bello 220 38 34 31 31
* Approximate distance to nearest intersection
Attachment 2

12.A-20Council Agenda 3-15-2022

12574500 9

3.4 Future Intersection Analysis
The Future conditions scenario represents forecasted traffic conditions based on the City General Plan growth projections. The Pismo Beach travel demand model was also used to develop forecast volumes for operations analysis. Table 3 below presents the projected AM & PM traffic operations based on the on-site traffic volumes and intersection lane geometrics and control.

Table 3 Future LOS Operation
Intersection Control
Type
Target
LOS
AM Peak Hour PM Peak Hour
Delay LOS Delay LOS
Bello St / Wadsworth Ave AWSC C 78.6 F 10.9 B

1. LOS = Delay average of all approaches for AWSC
As presented in Table 3, the intersection is projected to operate deficiently in the AM peak hour. In addition, the intersection is not projected to meet the Warrant 3 conditions.

3.5 Future Queue Analysis
The results of the intersection operational analysis include an estimate of the 95th percentile and max queue lengths. The projected storage capacity (where applicable) and the calculated 95 th percentile and max queue
lengths are presented in Table 4. The storage capacities reported in Table 4 are based on measurements from available aerial photographs. Calculated 95th or max queue lengths that exceed the storage capacity are indicated in bold type.

Table 4 Future Intersection Queueing Summary
Intersection Existing Storage *
Capacity
Calculated 95th and Max Percentile Queue Length (ft.)
95th Percentile Max Percentile
Approach AM PM AM PM
Bello St / Wadsworth Ave
EB Wadsworth 370 317 84 425 94
WB Wadsworth 725 196 66 282 76
NB Bello 500 64 58 74 67
SB Bello 220 47 43 51 31
* Approximate distance to nearest intersection
The exhibits are listed and shown below:

Existing Queueing Exhibits
x Figure E: Existing Intersection Queueing & Truck Turning Overlay – Option 1 (Right Position) x Figure F Existing Intersection Queueing & Truck Turning Overlay – Option 1 (Left Position) x Figure G: Existing Intersection Queueing & Truck Turning Overlay – Option 2 (Right Position) x Figure H: Existing Intersection Queueing & Truck Turning Overlay – Option 2 (Left Position) Future Queueing Exhibits
x Figure I: Future Intersection Queueing & Truck Turning Overlay – Option 1 (Right Position) x Figure J: Future Intersection Queueing & Truck Turning Overlay – Option 1 (Left Position) x Figure K: Future Intersection Queueing & Truck Turning Overlay – Option 2 (Right Position) x Figure L: Future Intersection Queueing & Truck Turning Overlay – Option 2 (Left Position) Attachment 2

12.A-21Council Agenda 3-15-2022

12574500 10

3.6 Traffic Congestion & Queue Conflicts.

Under both existing and cumulative conditions, if an emergency response was initiated from the project site during either the AM or PM peak hour, fire apparatus would be obstructed by vehicles queuing along NB & SB Wadsworth as well as WB Bello. Under both scenarios if GHD recommends installing “ keep clear” markings at and beyond driveways as well as preempted emergency beacons or signals to clear queued traffic and allow apparatus to exit within their turning radius limitations as well as clearing queue traffic that maybe obstructing their exit.

Attachment 2

12.A-22Council Agenda 3-15-2022

The Power of Commitment
12574500 9
Attachment 2

12.A-23Council Agenda 3-15-2022

12574500 12
Attachment 2

12.A-24Council Agenda 3-15-2022

12574500 13
Attachment 2

12.A-25Council Agenda 3-15-2022

12574500 14
Attachment 2

12.A-26Council Agenda 3-15-2022

12574500 15
Attachment 2

12.A-27Council Agenda 3-15-2022

12574500 16
Attachment 2

12.A-28Council Agenda 3-15-2022

12574500 17
Attachment 2

12.A-29Council Agenda 3-15-2022

12574500 18
Attachment 2

12.A-30Council Agenda 3-15-2022

The Power of Commitment
12574500 17

4. Intersection and Queueing Effects on Emergency
Response.

Emergency vehicle exits from both the Wadsworth/Bello Intersection driveway option, and the Wadsworth driveway option were modeled using VISSIM to determine potential delays to emergency response times. Only movements that had potentially obstructing queues were analyzed. For the purposes of this analysis two worst case scenarios were assumed. First it was assumed that on-street parking would be fully utilized preventing queued vehicles from moving to side to clear the fire apparatus. Second The fire apparatus would not be able to turn contraflow upon exiting the driveway. The analysis also assumed parking restrictions to geometrically accommodate fire apparatus exits, keep clear areas restricted queuing directly in front of the driveway, and under an alternative scenario emergency Hybrid-Beacons are provided.

As shown in table 5 below the diagonal driveway option at Bello & Wadsworth would likely experience up to 18s of emergency response delay clearing the intersection during the AM peak hour. Providing a beacon system could reduce that delay by 3 or more seconds depending on when the beacon is activated.

Table 5 Bello & Wadsworth Intersection
Movement AM Peak Hour PM Peak Hour
Baseline
Hybrid-
Beacon Baseline
Hybrid-
Beacon
To SB Bello 11s 9s 10s 8s
To EB Wadsworth 18s 15s 12s 8s
As shown in table 6 below the traditional driveway option on Wadsworth would likely experience up to 25s of emergency response delay clearing the Bello & Wadsworth intersection during the AM peak hour. Providing a beacon system could reduce that delay by 2 or more seconds depending on when the beacon is activated.

Table 6 Wadsworth Driveway
Movement AM Peak Hour PM Peak Hour
Baseline
Hybrid-
Beacon Baseline
Hybrid-
Beacon
To SB Bello 25s 23s 20s 18s
To EB Wadsworth 10s 6s 9s 6s
To reduce these delays the following alternatives are recommended:

1. Parking could be restricted along Wadsworth & Bello providing area for queued vehicles to pull over and allow fire apparatus to pass.

2. Emergency Hybrid-Signals could be installed on WB Wadsworth and NB Bellow in advance of the intersection, during an emergency response the beacons would prevent vehicles from queuing at the intersection.

3. The intersection of Bello and Wadsworth could be signalized with emergency vehicle preemption allowing queues obstructing fire apparatus to clear the intersection.

Attachment 2

12.A-31Council Agenda 3-15-2022

12574500 19
Keep clear pavement markings are also recommended, however only under the Wadsworth driveway option. It recommended that a 80’-90’ keep clear area be established at that driveway. This would cause maximum queue lengths to extend up to 250’. Keep clear pavement markings under the diagonal Bello & Wadsworth driveway would conflict with stop controls.

5. Preliminary Grading Assessment
Wadsworth Ave slopes at 4%-5% along the project site, whereas Bello St is relatively flat. Based on survey data received by the City, GHD performed a preliminary assessment to determine how much roadway and sidewalk reconstruction could be expected and identify potential conflicts with reconstruction and underground utilities. Figures M & N below depicts possible roadway reconstruction and call out potential utility conflicts.

Attachment 2

12.A-32Council Agenda 3-15-2022

The Power of Commitment
12574500 18
Attachment 2

12.A-33Council Agenda 3-15-2022

12574500 19
Attachment 2

12.A-34Council Agenda 3-15-2022

The Power of Commitment
12574500 19

6. Concept Signing & Striping Plans.

Attachment 2

12.A-35Council Agenda 3-15-2022

STRIPING PLAN OPTION 1
This document shall not be used for
construction unless signed and sealed for
construction.Sheet No.

Original Size
Title
Project
ClientDesignerDrawn
Scale
Plot Date:Filename:3 March 2022 - 8:07 PM N:\US\San Luis Obispo\Projects\561\12574500\Digital_Design\ACAD\Figures\12574500-GHD-0000-STP-CI-0001-Striping.dwg ANSI B
Date
Plotted By: Joe Ramirez-Moreno
Project No.

Sheet of
Reuse of Documents
This document and the ideas and designs incorporated
herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2022 GHD
Drafting
Check01"
Bar is one inch on
original size sheet
Design
Check
IssueNo.Drawn Approved Date
Project
Manager

PRELIMINARY
GHD Inc.
943 Reserve Drive, Suite 100
Roseville California 95678 USA
T 1 916 782 8688 W www.ghd.com

CITY OF PISMO BEACH
Attachment 2

12.A-36Council Agenda 3-15-2022

STRIPING PLAN OPTION 2
This document shall not be used for
construction unless signed and sealed for
construction.Sheet No.

Original Size
Title
Project
ClientDesignerDrawn
Scale
Plot Date:Filename:3 March 2022 - 8:00 PM N:\US\San Luis Obispo\Projects\561\12574500\Digital_Design\ACAD\Figures\12574500-GHD-0000-STP-CI-0001-Striping2.dwg ANSI B
Date
Plotted By: Joe Ramirez-Moreno
Project No.

Sheet of
Reuse of Documents
This document and the ideas and designs incorporated
herein, as an instrument of professional service, is the property of GHD and shall not be reused in whole or in part for any other project without GHD's written authorization. © 2022 GHD
Drafting
Check01"
Bar is one inch on
original size sheet
Design
Check
IssueNo.Drawn Approved Date
Project
Manager

PRELIMINARY
GHD Inc.
943 Reserve Drive, Suite 100
Roseville California 95678 USA
T 1 916 782 8688 W www.ghd.com

CITY OF PISMO BEACH
Attachment 2

12.A-37Council Agenda 3-15-2022