Public Safety Facility
Project Update
By Jorge Garcia, Assistant City Manager
Mary McGrath Architects
Manns Woodward Studios
Vanir Construction Management
September 6, 2022

Agenda •Project Update
•Overview of Options A-D
•Review of Option D
•Estimated Costs
•Recommendation
•Questions

Project Update
•Relocation of Fire Department Living Space
•Future relocation of the Police Station during construction •Development of Option D

2022 Options
Option A: Combined Facility -Fire Station Diagonal Exit at Bello St. / Wadsworth Ave.

Option B: Separate Facilities –Fire Station Diagonal Exit at Bello St. / Wadsworth Ave.

Option C: Separate Facility -Fire Station Exit at Bello Street Adjacent to Existing Police Station Option D: New Police Station Closer to Wadsworth -Fire Station Remodel of Existing Police Station

Option A

Option B

Option C

Option D

Option D
Police Station-First Floor
Police Station-Second Floor
Fire Department

PLAN LEGEND

ADMIN / RECORDS
■ PATROL

DETECTIVES

STO RAG E
PATROL

DETECTIVES
OPTION D - BUILDING 1 - ZONING - 1ST FLOOR

TRAINING / EOC

SUPPORT SPACES

VERTICAL CIRCULATION
PATROL
PATROL

STORAGE

ADMIN / RECORDS

MAIN ENTRY

TRAINING /
EOC
PATROL
__ STORAGE

SUPPORT SPACES

TRAINING / EOC
1 MARY MCGRATH I ARCHITECTS

PISMO BEACH

JOINT -USE PUBLIC SAFETY CENTER
1000 BELLO STREET
PISMO BEACH, CA 93449
BUILDING 1 - ZO
••

STUDIOS

ARCHITECTURE MASTER PLANNING
Phone: 510.208, 00
www. morymcymlhorch Bec,s.c om
09/06/22 I A113

PLAN LEGEND
MAI

STUDIOS
ARCHITECTURE • MASTER PLANNING

ADMINISTRATION

DISPATCH

LOCKER ROOMS

SUPPORT SPACES

VERTICAL CIRCULATION

ADMINISTRATION
ADMIN.

SUPPORT
SPACES

ADMINISTRATION
OPTION D - BUILDING 1 -ZONING - 2ND FLOOR

LOCKER ROOMS
61016TH STREET, SUITE 219
OAKLAND, CA 96612
Phone: S10.200.9600
www.morvmommhoLmneol..00m

PISMO BEACH

JOINT -USE PUBLIC SAFETY CENTER
1000 BELLO STREET
PISMO BEACH, CA 93449

DISPATCH
BUILDING 1 -ZONING - 2ND FLOOR
09/06/22 I A114

PLAN LEGEND

APPARATUS BAYS

APPARATUS & BUILDING

SUPPORT SPACES

PRIVATE -

BUNKS/LOCKERS

SEMI -PRIVATE - LIVING

PUBLIC -

OFFICE/CONFERENCE

SUPPORT SPACES

OUTDOOR LIVING AREA
MAI

STUDIOS
BUNKS
1-

OFFICE /

CONFERENCE

LOCKERS

OUTDOOR LIVING AREA
LIVING

OFFICE /

CONFERENCE

MAIN ENTRY
OPTION D - BUILDING 2 - ZONING

MARY MCGRATH I ARCHITECTS

PISMO BEACH

JOINT -USE PUBLIC SAFETY CENTER
61016TH STREET, SUITE 219 1000 BELLO STREET
OAKLAND. CA 96612
PISMO BEACH, CA 93449

SUPPORT
SPACES

APPARATUS

SUPPORT

BUILDING

SUPPORT

APPARATUS

SUPPORT
_APPARATUS

SUPPORT

APPARATUS BAYS
_ 11 _0 1-r1
Ak

APPARATUS BAYS
BUILDING 2 - ZONING

Cost Estimates
Site Plan Estimated Cost
•Option A $25M to $30M
•Option B $24M to $29M
•Option C $26M to $31M
•Option D $28M to $34M

Recommendation
Police and Fire Chief Option Recommendations
Staff Report Recommendation

Staff Report Recommendation
Staff recommends that the City Council select and direct staff to finalize the Bridging and Criteria Documents for one of the four options outlined and begin the design completion.

Design-Build Entity Teams
•Three Team were prequalified by the City Council
•F&H/LDA
•Erickson-Hall/PBK-WLC
•Swinerton/Ten Over
•Teams were selected based on firm history, completion of similar projects, work on essential services facilities, insurance, workers’ compensation/safety history, references, financial information, and a 38-page questionnaire

Next Steps
•Anticipated RFP release would be December 2022
•Responses would be due by February 2023
•Evaluation, Proposal Interviews with City Council March 2023 •Design-Build Entity Selection-April/May 2023