Cities Index.
Agenda packet, regular meeting, first session

Pismo Beach City Council
November 15, 2022

Document
Agenda packet, regular meeting, first session
Meeting
November 15, 2022
Body
Pismo Beach City Council
Pages
7
Original file
736 KB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.
Page 1 of 7 ends

AGENDA
Pismo Beach City Council
Tuesday, November 15, 2022
Time Meeting Type Physical Location Virtual Participation Option 5:00 p.m. Closed Session Admin Conference Room, City Hall None 5:30 p.m. Regular Meeting 1 2 Council Chamber, City Hall https://us02web.zoom.us/j/84823715585 1 Live virtual participation is offered via Zoom.
2 Broadcast meeting also available, for viewing only, on cable Channel 20 and online at pismobeach.org/agenda.

0.HYBRID MEETING INSTRUCTIONS:

To continue conducting the people’s business within San Luis Obispo County, State of California, and CDC health and safety guidelines, meetings are being conducted in a hybrid format with both in-person and virtual public participation. Ways to watch this meeting and submit public comment are provided below.

Watch and participate in person:
•Regular Meeting: Visit the Council Chamber at City Hall, 760 Mattie Road, Pismo Beach, CA 93449. •To make Regular Meeting public comment, please submit an optional blue “speaker slip” to staff; the Mayor will ask you to approach the lectern to speak during the public comment period on your item of interest. •To make Closed Session public comment, please be present in the Chamber at the start of Closed Session; the Mayor will call for public comment prior to commencing the closed proceedings.

Watch and participate via Zoom:
•Regular Meeting only: Click this link on any computer or mobile device:
https://us02web.zoom.us/j/84823715585 . This URL may also be typed into a web browser. •To make Regular Meeting public comment, press the “raise your hand” button when the comment period for your item of interest begins. You will be notified when you’ve been unmuted and it’s your turn to speak.

Listen and participate via telephone:
•Regular Meeting only: Call 1-669-900-6833 to join by telephone audio only. Enter Meeting ID 848 2371 5585 when prompted.
•To make Regular Meeting public comment, press *9 to “raise your hand” when the comment period on your item of interest begins. You will be notified when you’ve been unmuted and it’s your turn to speak.

Watch online:
•Regular Meeting only: Visit www.pismobeach.org/agenda and scroll to “Upcoming Events.” When the live broadcast begins, an “In Progress” link will appear; click this link to watch the livestream. A recording of the meeting will be available on demand shortly after the meeting ends.

Watch on Channel 20:
•Regular Meeting only: Tune to local cable channel 20 in Pismo Beach; the meeting will be broadcast live.

Meetings are also replayed at 9:00 a.m., 6:00 p.m., and 1:00 a.m. each day the following week.

Submit written comment:
•Regular Meeting and Closed Session: In advance of the meeting, written comments may be emailed to [email protected] or mailed or delivered to the City Clerk’s Office, 760 Mattie Road, Pismo Beach, CA 93449. During the Regular Meeting no later than the start of the comment period for your item of interest, written comment may be hand-delivered to staff in the Council Chamber. Emails submitted after the start of the meeting may not be fully considered prior to any action taken on the item.

Submit voicemail comment:
•Regular Meeting and Closed Session: Call 805-773-7005 and leave a voicemail before the meeting.

Voicemails submitted after the start of the meeting may not be fully considered prior to any action taken on the item. This automated voicemail line will not be answered or monitored for other purposes.

Please note:
•Meetings may begin a few minutes after the scheduled start time. •Meetings will be recorded, except closed sessions; these recordings are public record. •Phone numbers of call-in participants may be visible to other meeting participants, or in meeting recordings. •Phone numbers of voicemail commenters may be visible in the public record along with transcripts.

Please contact City Clerk Erica Inderlied at [email protected] with questions.

Council Agenda 11-15-2022

Pismo Beach City Council Agenda November 15, 2022

Page 2 of 7 ends

Special Closed Session—5:00 p.m.

Administration Conference Room, City Hall, 760 Mattie Road, Pismo Beach, CA 93449

CALL TO ORDER: Mayor Waage

1. ROLL CALL:

Mayor: Waage
Mayor Pro Tem: Reiss
Council Members: Blake, Guthrie, Newton

2. PUBLIC COMMENT PERIOD
At this time, members of the public may comment on any item appearing on the agenda.

Please adhere to the following procedures when addressing the Council:
• Please limit your comments to 3 minutes or less.
• Unduly disruptive behavior will not be permitted.

Documents submitted to the Council become public record unless otherwise exempt from disclosure.

3. ANNOUNCEMENT OF CLOSED SESSION ITEM(S)

Item 3.A: Conference with Labor Negotiators (Government Code §54957.6) Agency designated representatives: James R. Lewis
Employee organization: Pismo Beach Police Officers Association (POA)

Item 3.B: Conference with Legal Counsel – Anticipated Litigation Initiation of litigation pursuant to paragraph (4) of subdivision (d) of Government Code §54956.9: One potential case

4. CLOSED SESSION REPORT
If a regular meeting follows this Closed Session, the Closed Session Report will be made during the regular meeting.

5. ADJOURNMENT

Meeting Time Date Location
Regular Meeting 5:30 p.m. Tuesday, November 15, 2022 Council Chamber, City Hall

Council Agenda 11-15-2022

Pismo Beach City Council Agenda November 15, 2022

Page 3 of 7 ends

Regular Meeting—5:30 p.m.

Council Chamber, City Hall, 760 Mattie Road, Pismo Beach, CA 93449

CALL TO ORDER: Mayor Waage

1. ROLL CALL:

Mayor: Waage
Mayor Pro Tem: Reiss
Council Members: Blake, Guthrie, Newton

2. PLEDGE OF ALLEGIANCE

3. ACCEPTANCE OF AGENDA

4. PRESENTATIONS

Item 4.A: Presentation: US 101 Pismo Congestion Relief Project Update (SLOCOG)

5. PUBLIC COMMENT PERIOD
At this time, members of the public may comment on any item NOT appearing on the agenda. For items appearing on the agenda, including the Consent Calendar, the public will be invited to make comments during Council consideration of the item. In accordance with state law, matters raised as part of this comment period cannot be discussed or acted upon by the City Council at this time.

However, in response to a matter raised as part of this comment period, the Council may, during Item 13, City Council Comments and Requests, direct staff to assist a speaker, or schedule the matter for consideration on a future agenda.

Please adhere to the following procedures when addressing the Council:
• Please limit your comments to 3 minutes or less.
• Unduly disruptive behavior will not be permitted.

Documents submitted to the Council become public record unless otherwise exempt from disclosure.

6. CITY MANAGER’S REPORT - No action to be taken

7. CITY ATTORNEY’S REPORT / CLOSED SESSION REPORT - No action to be taken

8. COUNCIL COMMITTEE REPORTS

1. Air Pollution Control District, SLO County (Waage/Newton)

2. California Coastal Coalition Board (Reiss/Blake)

3. California Joint Powers Insurance Authority Board (Reiss)

4. Central Coast Community Energy Policy Board (Mayor)

5. Chapman Estate Foundation Liaison (Reiss)

6. Coastal Cities Group, League of CA Cities (Waage)

7. CAPSLO Board of Directors (Reiss)

8. Conference and Visitors Bureau Board Liaison (Newton)

9. Friends of Price House Liaison (Waage)

10. Hazard Mitigation & Fire Safety (Blake/Waage)

11. Homeless Services Oversight Council (Guthrie)

12. Integrated Waste Management Authority (Newton)

13. Mobile Home Rent Stabilization Subcommittee (Blake/Waage)

14. REACH (formerly EVC) (Blake)

15. Regional Transit Authority, SLO (Waage/Reiss)

16. Shell Beach Improvement Group Liaison (Newton/Reiss)

17. SLOCOG (Waage/Reiss)

18. South County Chambers of Commerce Gov’t Affairs (Blake)

19. Visit SLO CAL Advisory Committee (Newton)

20. Water Resources Advisory Committee, SLO (Guthrie)

21. Zone 3 Water Advisory Committee, SLO (Guthrie)
(Govt Code Section 53232.3)

Council Agenda 11-15-2022

Pismo Beach City Council Agenda November 15, 2022

Page 4 of 7 ends

9. CONSENT CALENDAR
All Consent Calendar items will be acted upon by a single action of the City Council unless otherwise requested by an individual Council Member for separate consideration. Public comment on Consent Calendar items will be invited prior to action on the Calendar.

Item 9.A: Adoption of Meeting Minutes (Inderlied)

Recommendation:

Adopt Minutes of the November 1, 2022 Closed and Regular Meetings.

Item 9.B: Payroll Register and Register of Demands (Feeser)

Recommendation:

1. Approve the Summary of Payroll Register for October 23, 2022;

2. Approve the Register of Demands for October 21, 2022.

Item 9.C: Department Activity Reports for October 2022 (All)

Recommendation:

Receive reports as information only.

Item 9.D: Update on March 16, 2020 and January 12, 2017 Emergency Proclamations (Inderlied)

Recommendation:

No action required; information only.

Item 9.E: Acceptance of Grant Funds Allocated by the Office of Traffic Safety (OTS) and Authorization of Purchase of One Extrication System and Airbags from LN Curtis (Lee)

Recommendation:

Adopt a Resolution authorizing the acceptance of grant funds in the amount of $46,000 from the Office of Traffic Safety, and the purchase of an extrication system and airbags from LN Curtis, and appropriating related budget adjustments in Fiscal Year 2023.

Item 9.F: Traffic Safety Committee Recommendations to City Council (Fine)

Recommendation:

1. Adopt a Resolution authorizing the installation of up to 3 pedestrian and bicycle symbolled signs, up to 3 “yield to pedestrians” signs, and up to 3 “bikes reduce speed” signs along the Shell Beach Road multi-use path;

2. Receive a report on the items considered at the most recent Traffic Safety Committee meeting.

Council Agenda 11-15-2022

Pismo Beach City Council Agenda November 15, 2022

Page 5 of 7 ends

Item 9.G: Notice of Completion for the Bello Street Bridge Replacement Project (Fine)

Recommendation:

Authorize the City Manager to sign, and the City Clerk to record, a Notice of Completion for the Bello Street Bridge Replacement Project.

Item 9.H: Acceptance of Selective Traffic Enforcement Program (STEP) Funding Award From the Office of Traffic Safety (Smith)

Recommendation:

Adopt a Resolution accepting grant funds in the amount of $55,000 from the California Office of Traffic Safety, and appropriating $55,000 in grant revenues and $55,000 in various costs in the General Fund Police Department budget in FY 2023.

Item 9.I: Adoption of Findings Relating to AB 361 (Virtual Meetings) (Inderlied)

Recommendation:

Adopt the following findings with respect to the City of Pismo Beach’s utilization of the provisions of Assembly Bill 361, relating to Brown Act teleconferences:

1. The City Council has reconsidered the circumstances of the state of emergency created by the coronavirus pandemic.

2. The following circumstances exist:
• The state of emergency continues to directly impact the ability of the Council Members to meet safely in person.

10. ITEMS PULLED FROM CONSENT CALENDAR

11. PUBLIC HEARINGS - No earlier than 6:00 p.m.

GENERAL PROCEDURES FOR PUBLIC HEARINGS (Mayor/Presiding Officer reserves discretion to set speaking allowances):

1. City staff will present the staff report and recommendation, and respond to technical/clarifying questions from Council;

2. Mayor will open the public hearing, and invite the project applicant, or representative, to present the project (Limited to 10 mins);

3. In an Appeal Hearing, the Mayor will then invite the appellant, or representative, to present their appeal (Limited to 10 mins);

4. Mayor will then ask other interested persons to testify regarding the project (Limited to 3 mins per speaker);

5. Mayor will invite the project applicant, or representative, to make a rebuttal if desired (Limited to 5 mins);

6. In an Appeal Hearing, the Mayor will then invite the appellant, or representative, to make a rebuttal if desired (Limited to 5 mins);

7. Mayor will close the public hearing, following which the Council will deliberate and act on the matter.

Item 11.A: Adoption (Second Reading) of an Ordinance that Adopts by Reference and Amends the Latest Editions of the Constituent Codes of the California Building Standards Code, Makes Findings of Fact to Support the Amendments, and Makes a Determination of Exemption Under the California Environmental Quality Act (Downing)

Recommendation:

1. Conduct a public hearing to receive input;

2. Adopt an Ordinance amending Titles 8 and 15, Chapters 8.04, 8.08, 15.04, and 15.08 of the Pismo Beach Municipal Code; adopting by reference Council Agenda 11-15-2022

Pismo Beach City Council Agenda November 15, 2022

Page 6 of 7 ends

codes comprising the 2022 California Building Standards Code (California Code of Regulations, Title 24, Parts 1-12), including the California Fire Code (2022 Edition, incorporating and amending the 2021 International Fire Code); the California Building Code Volumes 1 and 2 (2022 Edition, incorporating and amending the 2021 International Building Code), the California Residential Code (2022 Edition, incorporating and amending the 2021 International Residential Code), the California Electrical Code (2022 Edition, incorporating and amending the 2020 National Electrical Code), the California Mechanical Code (2022 Edition, incorporating and amending the 2021 Uniform Mechanical Code, the California Plumbing Code (2022 Edition, incorporating and amending the 2021 Uniform Plumbing Code), the California Energy Code (2022 Edition), the California Historical Building Code (2022 Edition), the California Green Building Standards Code (2022 Edition), and the 2021 International Property Maintenance Code together with certain amendments thereto; adopting findings of facts to support the imposition of requirements other than those of the California Building Standards Code, and making a determination of exemption under CEQA.

12. BUSINESS ITEMS - May be reordered and heard prior to Public Hearings

Item 12.A: Water Supply Update (Fine)

Recommendation:

1. Receive an update on the City’s water supply; and

2. Discuss the purchase of additional drought buffer and provide staff with direction on how to proceed.

Item 12.B: Options for the Pier Avenue Stairs (Fine)

Recommendation:

Review options for the Pier Avenue Stairs and provide staff with direction on how to proceed.

Item 12.C: Consideration of Feasibility of a Permanent Outdoor Dining Study (Downing)

Recommendation:

Provide direction to staff on the implementation of an outdoor dining program, if desired.

Item 12.D: Technology Master Plan for FY 2023 Through FY 2028 (Feeser)

Recommendation:

Review and approve the City of Pismo Beach Technology Master Plan for FY 2023 through FY 2028.

13. CITY COUNCIL COMMENTS AND REQUESTS - No action to be taken

Council Agenda 11-15-2022

Pismo Beach City Council Agenda November 15, 2022

Page 7 of 7 ends

14. ADJOURNMENT

To the following meeting(s). Special and Closed Session times may be subject to change, as noticed. Meetings will be held in a hybrid in-person / virtual format unless otherwise noted:

Meeting Time Date Location
Regular Meeting 5:30 p.m. Tuesday, December 6, 2022 Council Chamber, City Hall Regular Council meetings will adjourn by 11:00 p.m. unless four-fifths of the Council votes to continue past that time. If the meeting is adjourned at 11:00 p.m., any remaining agenda items will be continued to the next regular meeting (R-97-04).

AFFIDAVIT OF POSTING
I, Erica Inderlied, City Clerk for the City of Pismo Beach, declare under penalty of perjury that the foregoing agenda for the November 15, 2022 meeting(s) of the Pismo Beach City Council was posted on November 10, 2022, at City Hall, located at 760 Mattie Road, Pismo Beach, CA, as well as on the City’s website.

Erica Inderlied, City Clerk

Meeting Schedule: The City Council of Pismo Beach regularly meets on the first and third Tuesdays of each month at 5:30 p.m., unless otherwise noticed. Closed and Special sessions will be duly noticed as needed.

Council Agendas: Agendas for Regular Meetings are available for public review on the City’s website at pismobeach.org/agenda and upon request from the City Clerk’s Office, typically by 4:00 p.m. on the Thursday prior to the meeting, but no later than 72 hours prior to the meeting. Agendas for Closed Sessions and other Special meetings are made available at least 72 hours prior to the meeting when possible, but no later than 24 hours prior to the meeting.

Related Materials: All materials submitted to the Council relating to items on this agenda are open for public inspection unless otherwise exempt by law. Staff reports and attachments published as part of this agenda packet, as well as copies of correspondence received relating to these agenda items and materials distributed at the meeting, may be obtained 1) in the consolidated online Agenda Center at pismobeach.org/agenda, 2) in the Access Pismo public records portal at pismobeach.org/accesspismo, 3) by request from the City Clerk at [email protected], or 4) in person at the City Clerk's Office, City Hall, 760 Mattie Road, Pismo Beach, Mon–-Fri 8:00 a.m.–-5:00 p.m. Please call (805) 773-7003 with any questions.

Broadcasting: Regular (televised) City Council meetings are available for viewing 24/7 at pismobeach.org/agenda, broadcast live on Channel 20, and re-broadcast during the week following the meeting on Channel 20 at 9:00 a.m., 6:00 p.m., and 1:00 a.m. each day.

Use of Equipment: Please contact the City Clerk’s Office if requesting to use the chamber equipment during public comment or as part of a scheduled presentation, 24 hours prior to the meeting at (805) 773-7003.

Notice Regarding Americans with Disabilities Act
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting or if you need agenda documents provided in an alternative format, please contact the City Clerk’s Office at 773-7003 as soon as possible prior to the meeting to ensure that reasonable arrangements can be made (28CFR 35.102-

35.104 ADA Title II).

Council Agenda 11-15-2022

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.A
` SUBJECT/TITLE:

ADOPTION OF MEETING MINUTES
RECOMMENDATION:

Adopt Minutes of the November 1, 2022 Closed and Regular Meeting.

BACKGROUND:

Attached for the Council’s consideration are the draft minutes of the subject meetings for review and adoption.

FISCAL IMPACT:

There is no fiscal impact associated with the preparation or adoption of meeting minutes.

ALTERNATIVES:

1. Adopt the minutes with revisions.

2.Decline to adopt the minutes; provide direction or request additional information.

ATTACHMENTS:

1.Draft Minutes for November 1, 2022
Submitted by: Erica Inderlied, City Clerk Meeting Date: November 15, 2022 City Manager Approval:

9.A-1Council Agenda 11-15-2022

DRAFT MINUTES
Pismo Beach City Council
Tuesday, November 1, 2022

Special Closed Session—5:00 p.m.

Administration Conference Room, City Hall, 760 Mattie Road, Pismo Beach, CA 93449

The City Council of the City of Pismo Beach met this date in a special closed session with Mayor Waage presiding.

CALL TO ORDER: Mayor Waage called the meeting to order at 5:00 p.m.

1. ROLL CALL:

Present: Absent:

Mayor Ed Waage None
Mayor Pro Tem Mary Ann Reiss
Council Member Sheila Blake
Council Member Marcia Guthrie (via teleconference)
Council Member Scott Newton

Staff Present:

Benjamin Fine, Public Works Director/City Engineer
David Fleishman, City Attorney
James R. Lewis, City Manager

2. PUBLIC COMMENT PERIOD

Call for public comment: No comment.

3. ANNOUNCEMENT OF CLOSED SESSION ITEMS

Mayor Waage announced the Closed Session items listed below.

Item 3.A: Conference with Legal Counsel – Existing Litigation (Paragraph (1) of subdivision (d) of Government Code §54956.9) Case Name Unspecified: Disclosure would jeopardize existing settlement negotiations

Item 3.B: Conference with Legal Counsel – Anticipated Litigation Significant exposure to litigation pursuant to paragraph (2) of subdivision (d) of Government Code §54956.9: One potential case

9.A-2Council Agenda 11-15-2022
Attachment 1
Packet Page 1

4. CLOSED SESSION REPORT

City Attorney Fleishman would report in the next regular open session that no reportable action was taken on the above items.

5. ADJOURNMENT
At 5:27 p.m.

9.A-3Council Agenda 11-15-2022
Attachment 1
Packet Page 2

Regular Meeting—5:30 p.m.

Council Chamber, City Hall, 760 Mattie Road, Pismo Beach, CA 93449

The City Council of the City of Pismo Beach met this date in a regular session with Mayor Waage presiding.

CALL TO ORDER: 5:30 p.m.

1. ROLL CALL:

Present: Absent:

Mayor Ed Waage None
Mayor Pro Tem Mary Ann Reiss
Council Member Sheila Blake
Council Member Marcia Guthrie
Council Member Scott Newton

Staff Present:

Matt Downing, Community Development Director
Nadia Feeser, Administrative Services Director
Benjamin Fine, Public Works Director/City Engineer
David Fleishman, City Attorney
Erica Inderlied, City Clerk
Gordon Jackson, Director of Tourism and Events
Paul Lee, Battalion Chief
James R. Lewis, City Manager
Jeff Smith, Chief of Police
Other staff present as noted below

2. PLEDGE OF ALLEGIANCE

Mayor Waage led the Pledge of Allegiance.

3. ACCEPTANCE OF AGENDA

No requests to reorder the agenda.

4. PRESENTATIONS

None.

9.A-4Council Agenda 11-15-2022
Attachment 1
Packet Page 3

5. PUBLIC COMMENT PERIOD

Call for public comment:

Steven West spoke.

6. CITY MANAGER’S REPORT

City Manager Lewis commented on various topics.

7. CITY ATTORNEY’S REPORT / CLOSED SESSION REPORT

City Attorney Fleishman reported that the Council had taken no reportable action during its 5:00 p.m. Closed Session.

8. COUNCIL COMMITTEE REPORTS

The Council reported on recent and upcoming meetings of various external bodies:

Mayor Waage:

San Luis Obispo Regional Transit Authority (SLORTA).

9. CONSENT CALENDAR

Call for public comment: No comment.

Action: Adopt Consent Calendar.

Motion: Guthrie
Second: Newton

Vote: The motion passed on the following vote (Items 9.A through 9.D; Items 9.F through

9.H):

Ayes: 5 Guthrie, Newton, Blake, Reiss, Waage
Noes: 0

Absent: 0
Abstain: 0
Recused: 0

Vote: The motion passed on the following vote (Item 9.E):

Ayes: 4 Guthrie, Newton, Reiss, Waage
Noes: 1 Blake

Absent: 0
Abstain: 0
Recused: 0

9.A-5Council Agenda 11-15-2022
Attachment 1
Packet Page 4

Item 9.A: Adoption of Meeting Minutes (Inderlied)

Recommendation:

Adopt Minutes of the October 18, 2022 and Regular Meeting.

Item 9.B: Payroll Register and Register of Demands (Feeser)

Recommendation:

1. Approve the Summary of Payroll Register for October 9, 2022;

2. Approve the Register of Demands for October 7, 2022 and October 14, 2022.

Item 9.C: Purchase of Eight Parking Pay Stations from IPS Group (Smith)

Recommendation:

Adopt a Resolution authorizing the purchase of eight replacement parking pay stations from IPS Group in the amount of $68,915.37 in Fiscal Year 2023.

Legislative Record: Resolution R-2022-092 adopted.

Item 9.D: Purchase of Ten Mobile License Plate Recognition Cameras from Vigilant Solutions (Smith)

Recommendation:

Adopt a Resolution authorizing the City Manager to enter into an agreement with Vigilant Solutions for the purchase of ten Mobile License Plate Recognition Cameras for a total cost of $119,943.75 over a five-year period.

Legislative Record: Resolution R-2022-093 adopted.

Item 9.E: Contract with San Luis Obispo County for Animal Care and Control Services for Fiscal Years 2023–2025 (Smith)

Recommendation:

Adopt a Resolution authorizing the City Manager to execute a three- year contract with the County of San Luis Obispo for Animal Care and Control Services from July 1, 2022 to June 30, 2025.

Legislative Record: Resolution R-2022-094 adopted.

9.A-6Council Agenda 11-15-2022
Attachment 1
Packet Page 5

Item 9.F: New Water Conservation Incentive Programs (Fine)

Recommendation:

Adopt a Resolution establishing the Hot Water Recirculation Pump Rebate, Washing Machine Rebate, Rain Barrel Rebate, and Smart Irrigation Controller Rebate programs.

Legislative Record: Resolution R-2022-095 adopted.

Item 9.G: Contract with Alexander’s Contract Services, Inc. to Provide Water Meter Reading Services (Feeser)

Recommendation:

Adopt a Resolution authorizing the City Manager to enter into an agreement with Alexander’s Contract Services, Inc. to provide water meter reading services from December 1, 2022 to November 30, 2027.

Legislative Record: Resolution R-2022-096 adopted.

Item 9.H: Adoption of Findings Relating to AB 361 (Virtual Meetings) (Inderlied)

Recommendation:

Adopt the following findings with respect to the City of Pismo Beach’s utilization of the provisions of Assembly Bill 361, relating to Brown Act teleconferences:

1. The City Council has reconsidered the circumstances of the state of emergency created by the coronavirus pandemic.

2. The following circumstances exist:
• The state of emergency continues to directly impact the ability of the Council Members to meet safely in person.

10. ITEMS PULLED FROM CONSENT

None.

11. PUBLIC HEARINGS

None.

9.A-7Council Agenda 11-15-2022
Attachment 1
Packet Page 6

12. BUSINESS ITEMS

Item 12.A: 2022 Paving Project Update (Fine)

Recommendation:

No action required; information only.

Presenting staff:

James R. Lewis, City Manager
Chad Stoehr, Engineer

Call for public comment: No comment.

Action: No action.

Item 12.B: Façade Improvement Rebate Program (Downing)

Recommendation:

Receive a report on the City’s existing Façade Improvement Rebate Program and provide direction to staff on how to publicize the program, and whether modifications are desired.

Presenting staff:

Matt Downing, Community Development Director
James R. Lewis, City Manager

Call for public comment: No comment.

Action: Consensus in support of directing staff to expand the current Façade Improvement Program to include all commercial areas of the city, with redesigned and clarified program informational materials for the public.

In support: 5 Blake, Guthrie, Newton, Reiss, Waage
In opposition: 0

Absent: 0
Abstain: 0
Recused: 0

9.A-8Council Agenda 11-15-2022
Attachment 1
Packet Page 7

Item 12.C: Residential Sidewalk Development Policy (Fine)

Recommendation:

Provide staff with direction on potential modifications to the current residential sidewalk development policy.

Presenting staff:

Benjamin Fine, Public Works Director/City Engineer
James R. Lewis, City Manager

Call for public comment: No comment.

Action: Provide the following direction to staff:

1. Return during goal-setting for the Fiscal Year 2024 & 2025 budget cycle with a workplan to fund a study to evaluate right-of-way width and sidewalk feasibility for residential streets citywide.

2. Until such time that a study is conducted and/or further Council policy is enacted, implement the following direction:

A. Require the project applicant to develop sidewalk, constructed to City standards, along the street frontage of a parcel for development projects involving:
i. New residential construction requiring a building
permit, including tear-down and rebuilds.
ii. The cumulative remodel and/or addition of 50% or
more of the floor area of a residential structure.

B. Exclude Accessory Dwelling Units (ADUs) from the definition of new construction, and exclude ADUs when calculating the percentage of remodel or addition work being performed, for purposes of determining whether sidewalk is required.

C. Do not require such sidewalk development where the street width does not permit the development of sidewalk.

Motion: Newton
Second: Guthrie

Vote: The motion passed on the following vote:

Ayes: 5 Newton, Guthrie, Blake, Reiss, Waage
Noes: 0

Absent: 0
Abstain: 0
Recused: 0

9.A-9Council Agenda 11-15-2022
Attachment 1
Packet Page 8

Item 12.D: Introduction (First Reading) of an Ordinance that Adopts by Reference and Amends the Latest Editions of the Constituent Codes of the California Building Standards Code, Makes Findings of Fact to Support the Amendments, and Makes a Determination of Exemption Under the California Environmental Quality Act (Downing)

Recommendation:

1. Introduce an Ordinance amending Titles 8 and 15, Chapters 8.04, 8.08,

15.04, and 15.08 of the Pismo Beach Municipal Code; adopting by reference codes comprising the 2022 California Building Standards Code (California Code of Regulations, Title 24, Parts 1-12), including the California Fire Code (2022 Edition, incorporating and amending the 2021 International Fire Code); the California Building Code Volumes 1 and 2 (2022 Edition, incorporating and amending the 2021 International Building Code), the California Residential Code (2022 Edition, incorporating and amending the 2021 International Residential Code), the California Electrical Code (2022 Edition, incorporating and amending the 2020 National Electrical Code), the California Mechanical Code (2022 Edition, incorporating and amending the 2021 Uniform Mechanical Code, the California Plumbing Code (2022 Edition, incorporating and amending the 2021 Uniform Plumbing Code), the California Energy Code (2022 Edition), the California Historical Building Code (2022 Edition), the California Green Building Standards Code (2022 Edition), and the 2021 International Property Maintenance Code together with certain amendments thereto; adopting findings of facts to support the imposition of requirements other than those of the California Building Standards Code, and making a determination of exemption under CEQA;

2. Schedule a public hearing and second reading (adoption) of the above- referenced Ordinance for November 15, 2022, pursuant to Government Code Section 50022.3.

Presenting staff:

Matt Downing, Community Development Director
Ian Livingston, Building Official
James R. Lewis, City Manager

Call for public comment: No comment.

Action:

1. Introduce an Ordinance amending Titles 8 and 15, Chapters 8.04, 8.08,

15.04, and 15.08 of the Pismo Beach Municipal Code; adopting by reference codes comprising the 2022 California Building Standards Code (California Code of Regulations, Title 24, Parts 1-12), including the

9.A-10Council Agenda 11-15-2022
Attachment 1
Packet Page 9

California Fire Code (2022 Edition, incorporating and amending the 2021 International Fire Code); the California Building Code Volumes 1 and 2 (2022 Edition, incorporating and amending the 2021 International Building Code), the California Residential Code (2022 Edition, incorporating and amending the 2021 International Residential Code), the California Electrical Code (2022 Edition, incorporating and amending the 2020 National Electrical Code), the California Mechanical Code (2022 Edition, incorporating and amending the 2021 Uniform Mechanical Code, the California Plumbing Code (2022 Edition, incorporating and amending the 2021 Uniform Plumbing Code), the California Energy Code (2022 Edition), the California Historical Building Code (2022 Edition), the California Green Building Standards Code (2022 Edition), and the 2021 International Property Maintenance Code together with certain amendments thereto; adopting findings of facts to support the imposition of requirements other than those of the California Building Standards Code, and making a determination of exemption under CEQA;

2. Schedule a public hearing and second reading (adoption) of the above- referenced Ordinance for November 15, 2022, pursuant to Government Code Section 50022.3.

Motion: Guthrie
Second: Newton

Vote: The motion passed on the following vote:

Ayes: 5 Guthrie, Newton, Blake, Reiss, Waage
Noes: 0

Absent: 0
Abstain: 0
Recused: 0

Legislative Record: Ordinance O-2022-XXX introduced.

13. CITY COUNCIL COMMENTS AND REQUESTS

No requests.

14. ADJOURNMENT

At 7:13 p.m.

APPROVED: ATTEST:

________________________________ ________________________________ Ed Waage, Mayor Erica Inderlied, City Clerk

9.A-11Council Agenda 11-15-2022
Attachment 1
Packet Page 10

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.B
SUBJECT/TITLE:

PAYROLL REGISTER AND REGISTER OF DEMANDS
RECOMMENDATION:

1. Approve the Summary of Payroll Register for October 23, 2022.

2. Approve the Register of Demands for October 21, 2022.

BACKGROUND:

Attached are the Summary of Payroll Register(s) and Register(s) of Demands (Check Registers) noted above, provided for Council approval.

FISCAL IMPACT:

As demonstrated in the attached payroll and check registers.

ALTERNATIVES:

1.Request additional information from staff.

ATTACHMENTS:

1.Payroll Summary

2. Registers of Demands
Submitted by: Meeting Date: November 15, 2022
Nadia Feeser, Administrative Services Director / City Treasurer City Manager Approval:

9.B-1Council Agenda 11-15-2022
Packet Page 11

FOR PERIOD ENDING 10/23/22
CHECKS DATED 10/28/22
PAYROLL CHECKS AND DIRECT DEPOSIT TRANSACTIONS
Checks 556906 ‐ 556909 4
ACH 121

EARNINGS
REGULAR 359,810.82
HOLIDAY 4,563.49
OVERTIME (Includes Comp Time Payouts)18,790.19
Administration 647.51
Building ‐
Conference & Visitors Bureau 676.41
Police Department 11,209.40
Parking ‐
Engineering ‐
Fire ‐
Recreation ‐
Public Works 3,155.72
Water 1,812.63
Wastewater 1,288.52
Motor Vehicles
Subtotal‐Overtime 18,790.19$
SALARY ADJUSTMENTS ‐
TRAINING / UNIFORM ALLOWANCE 817.00
OTHER EARNINGS 16,669.04
$400,650.54
LESS AUTHORIZED PAYROLL DEDUCTIONS
FEDERAL WITHHOLDING TAX 40,334.81
FICA & MEDICARE 28,175.94
STATE INCOME TAX 14,498.03
STATE DISABILITY INSURANCE 3,807.15
GARNISHMENTS 461.53
HEALTH 1,851.23
SUPPLEMENTAL DISABILITY 1,480.48
SECTION 125 2,110.65
PERS 33,567.50
DEFERRED COMPENSATION 9,746.42
ADDITIONAL LIFE INSURANCE 296.17
UNION DUES 2,474.62
PISMO ATHLETIC CLUB 170.00
OTHER
NET PAYROLL $261,676.01
DIRECT DEPOSIT DEDUCTION 259,536.49
NET PAYROLL AFTER ACH DEPOSIT 2,139.52
SUMMARY PAYROLL REGISTER

9.B-2Council Agenda 11-15-2022
Attachment 1
Packet Page 12

City of Pismo Beach
Final Disbursement List Check Date 10/21/2022

US BANK
ACH/Vendor Check Check
Check#Number Payee Date Amount Description
ACH 10002 Internal Revenue Service 10/21/2022 94,961.13$ Federal Income Tax PD 10.14.22 ACH 11305 Public Employees Retirement System 10/21/2022 69,389.50 PERS Retirement ER and EE PD 10/14/22 ACH 12260 dba: Mission Square ICMA Retirement Trust - 457 10/21/2022 23,141.80 ICMA 457 Deferred Comp PD 10/14/22 ACH 12305 Franchise Tax Board 10/21/2022 17,907.88 SDI & State Income Tax PD 10/14/22 ACH 12360 CalPERS 457 Plan 10/21/2022 291.67 PERS 457 Deferred Comp ER PD 10/14/22 ACH 12708 dba: Mission Square ICMA Retirement Trust-Roth IRA 10/21/2022 510.00 ICMA Roth IRA PD 10/14/22 ACH 13455 Wex 10/21/2022 934.44 Fuel for City Vehicles 9/7/22 - 10/7/22 123887 14215 Dino Navin Anciaux 10/21/2022 382.00 Reimbursement: Compliance Inspector Grade 1 Exam & CWEA Membership 123888 11382 Applied Technology Group, Inc. 10/21/2022 23,690.38 SCADA Radio Replacement & Labor 123889 12623 AT&T 9391012188 10/21/2022 3,364.58 Phone Bill - 09/10/22 - 10/09/22 123890 11589 Austin's Wet Pets and Pond Maintenance, Inc 10/21/2022 140.00 Pond Maintenance Aug 2022 - Chapman Estate 123891 10888 Bound Tree Medical LLC 10/21/2022 56.63 Medical Supplies - Fire 123892 14229 Brendler Janitorial Service 10/21/2022 16,152.00 Janitorial Services - City Facilities Sept 2022 123893 11392 Brenntag Pacific Inc. 10/21/2022 1,818.83 Sodium Bisulfite 123894 10028 Brisco Mill & Lumber Yard 10/21/2022 315.47 Maintenance Supplies 123895 14414 California State Disbursement Unit 10/21/2022 461.53 Garnishment Flat DCSS PD 10/14/22 123896 14349 Callander Associates Landscape Architecture, Inc 10/21/2022 27,667.13 Ventana Tennis Courts Design Aug 2022 123897 10085 Cannon Associates 10/21/2022 46,246.00 Paving Project CM - August 2022 123898 10677 Central Coast Kayaks 10/21/2022 2,310.00 JG Kayaking Tour-67 participants 123899 13951 Central Coast Portables 10/21/2022 688.80 Portable Toilets - Tennis Courts & Price House 8/20/22 - 9/17/22 123900 11451 Channel Islands Technology Integrators' Group 10/21/2022 11,956.00 2022 Q3 Help Desk Ticket Overage 123901 11986 Culligan/Central Coast Water 10/21/2022 216.00 Car Wash Filtration 8/22/22 123902 14217 Deltina Coffee Roasters 10/21/2022 62.50 Coffee Supplies 123903 14447 Sophia Downs 10/21/2022 250.00 Deposit Refund: DCP Event 9/16/22 123904 13697 Dudek 10/21/2022 290.00 Prof Svcs GP/LCP 7/30/22 - 8/26/22 123905 13283 Epic Entertainment DJS, Lighting & Photo BoothsLLC 10/21/2022 650.00 Band Review 2022 Audio - Balance Due 123906 12589 Ferguson Enterprises, Inc. 10/21/2022 3,383.35 Water Distribution System Repairs Sept 2022 123907 12035 Ben Fine 10/21/2022 487.63 M&IE/Mileage: ASCE Conference 10/23-10/26/22 123908 13575 Jorge Garcia 10/21/2022 511.00 M&IE: 2022 MMASC Annual Conference 11/1-11/4/22 123909 10732 Granite Construction Company 10/21/2022 411,527.90 Ocean Blvd Improvements Aug 2022 123910 13373 Heather Schuh Huston 10/21/2022 600.00 Clam Painting PCV & Visitors Center Oct 2022 123911 14348 Teresa Jacques 10/21/2022 350.00 Cash for Grass - 262 Esparto 123912 12038 Madeline Kacsinta 10/21/2022 193.00 M&IE: MMASC Annual Conf 11/1-11/4/22 123913 11833 Keylock Security Specialists 10/21/2022 225.07 Maintenance Supplies 123914 12019 James Lewis 10/21/2022 149.25 M&IE/Mileage: CJPIA Conference 10/5-10/6/22 123915 10656 LN Curtis & Sons 10/21/2022 249.55 FD Equipment Maintenance 123916 13416 Phoenix Resolutions, Inc Mail Plus 10/21/2022 22.89 Postage 123917 14388 Megan Martin 10/21/2022 193.00 M&IE: MMASC Conf 11/1 - 11/04/22 123918 13562 Wayne L. Martin 10/21/2022 2,499.00 Pumpkins & Delivery - Pumpkins Event 10/29/22 123919 13645 MDN Engineering, LLP 10/21/2022 1,375.00 Bello Bridge Habitat Mitigation Sept 2022 123920 10097 Miners Hardware 10/21/2022 184.28 Maintenance Supplies 123921 14405 Mission Linen Supply 10/21/2022 1,237.38 Uniforms Sept 2022 123922 14353 Motorola Solutions, Inc. 10/21/2022 5,360.56 PD Body Worn Cameras 123923 13138 National Business Furniture LLC 10/21/2022 21,722.48 Corp Yard Remodel Furniture 2022 123924 12199 Noble Saw, Inc 10/21/2022 25.00 Park Equipment Maintenance 123925 14343 ODP Business Solutions, LLC 10/21/2022 1,034.38 Office Furniture - PW 123926 12036 Erin Olsen 10/21/2022 193.00 M&IE: MMASC Annual Conf 11/1-11/4/22 123927 12315 Pacific Gas & Electric Company 10/21/2022 1,910.83 Electricity 09/07/22 - 10/05/22 123928 12912 Pegboard 10/21/2022 245.90 Business License Statement Envelopes 123929 13149 Pismo Beach Lifeguard Association 10/21/2022 5.00 Lifeguard Dues PD 10/14/22 123930 12022 Pismo Beach Police Officer's Association 10/21/2022 1,587.53 POA Dues PD 10/14/22 123931 12335 Procare Janitorial Supply Inc 10/21/2022 1,024.47 Janitorial Supplies 123932 10452 Rolson Music & Sound 10/21/2022 650.00 Mobile Stage Rental - Pumpkins Event 10/29/22 123933 12174 Rotary Club Of Pismo Beach 10/21/2022 105.12 Rotary Club Dues - September 2022 123934 11266 San Luis Auto Parts Inc 10/21/2022 96.17 Vehicle Maintenance 123935 14190 Santa Ynez Valley Elite Event Party Rentals 10/21/2022 667.96 Band Review 2022 Rentals - Bal Due 123936 11208 SEIU Local 620 AFL/CIO 10/21/2022 882.45 SEIU Dues PD 10/14/22 123937 11168 Sherwin-Williams 10/21/2022 85.34 Paint Supplies for MVR Office 123938 12031 Stanley Convergent Security Solutions 10/21/2022 2,164.26 Monthly Security & Fire Monitoring Oct 2022 123939 12629 Tetra Tech Inc 10/21/2022 767.50 Map Checking Services Aug 2022 123940 12860 Townsend Public Affairs 10/21/2022 3,500.00 State Lobbying Services Aug 2022 123941 13905 Tripepi, Smith and Associates, Inc 10/21/2022 657.50 General Public Outreach and Education July 2022 123942 12982 Ultrex Business Products 10/21/2022 1,155.55 City-Wide Copier Usage Sept 2022 123943 12132 White Flag Pest Control Inc 10/21/2022 1,408.00 Pest Control Services 123944 12686 Mark Wilson 10/21/2022 51.86 Reimb: DMV Commercial Driver's License Renewal 123945 13549 Ron Workman 10/21/2022 250.00 Cash for Grass - 87 Villa Ct. 123946 14444 Sheila Young 10/21/2022 1,453.00 Cash for Grass - 94 Coral Circle 123947 12897 Zero Waste USA 10/21/2022 10,403.26 Dog Waste Bags - 100 Cases Total 824,449.69

9.B-3Council Agenda 11-15-2022
Attachment 2
Packet Page 13

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.C
SUBJECT/TITLE:

DEPARTMENT ACTIVITY REPORTS FOR OCTOBER 2022
RECOMMENDATION:

Receive reports as information only.

BACKGROUND:

The attached monthly department activity reports are for Council’s information.

FISCAL IMPACT:

Not applicable.

ALTERNATIVES:

1.Request additional information from staff.

ATTACHMENTS:

1.Administrative Services Department (Feeser)

2.City Manager's Office (Lewis)

3.Community Development Department (Downing)

4.Fire Department (Lee)

5.Management Services Department (Garcia)

6.Police Department (Smith)

7.Public Works and Engineering (Fine)

8.Tourism and Events Department (Jackson)
Prepared by: Respective departments. Meeting Date: November 15, 2022 City Manager Approval:

9.B-1Council Agenda 11-15-2022
Packet Page 14

City of Pismo Beach - Administrative Services Department Monthly Report – October 2022

KEY REVENUES

Transient Occupancy Tax (TOT)

As of January 1, 2021, TOT revenues are 11% of gross lodging revenues. These revenues reflect approximately 51% of the City’s General Fund budgeted revenues. Preliminary data for September rentals indicate that September 2022 TOT revenues are $1,495,897 which is below the year ago September 2021 TOT revenues of $1,552,865 by $56,968, or -3.67%. This is a preliminary amount as not all properties have reported. The following chart illustrates TOT revenues received in FY 2022 and FY 2023 by month.

Sales Tax Revenues

Sales tax revenues represent 1% of taxable sales received by the City. Fiscal Year 2023 sales tax revenues collected through October 2022 amount to $690,798, which is above the year-ago total of $639,940 by $50,858 or 7.95% for the same reporting period. Sales tax revenues are typically received 3 months after the month for which it was collected. The following chart illustrates sales tax revenues received in FY 2022 and FY 2023 by the month in which the sales tax was collected.

9.B-2Council Agenda 11-15-2022
Attachment 1
Packet Page 15

ECONOMIC INDICATOR

Consumer Price Index (CPI): For the Los Angeles/Riverside/Orange County area, the percent change in the CPI for the twelve months ending in September 2022 was 7.81%.

OPERATIONS

Finance

Financial Reporting
• FY 2022 Audit: The City’s auditors performed the Final audit fieldwork during the week of October 24th. The Administrative Services Department prepared the requested audit schedules, gathered sample documentation, and responded to questions as needed for the auditors.
• GASB 87: The Administrative Services Department continued to work on implementing GASB 87 regarding leases with the software vendor, Debtbook. • GASB 75: Finance staff worked with the City’s actuarial consultant to produce the GASB 75 report, recording the net liability of Other Post Employment Benefits (OPEB), the City’s retiree health costs.

Staff
• Changes:
o The City’s Accounting Technician, who performed payroll and collected Transient Occupancy Tax revenues, resigned from the City. A temporary employee was hired to

9.B-3Council Agenda 11-15-2022
Attachment 1
Packet Page 16

assist with various job functions within the Department. ASD anticipates needing the extra assistance for the next few months.
o The Finance Division is going through a reorganization of the Accounting Technician and Accounting Clerk positions. This includes have two positions performing the same function so that if a future employee leaves, another Account Clerk will be able to step in and assist until the Department fills that position. • Recruitment: Recruitment for the Account Clerk position within the Administrative Services Department closed October 30th.
• Development: Finance Staff have been cross-training to perform two functions to help with sustainability of the work in the future.

Technology

Infrastructure
• Corporate Yard Remodel: IT assisted Public Works with moving and setting-up equipment into their newly remodeled office space.
• Council Chamber Automated Camera System Project: IT worked with MSD to begin the installation of the automated camera system for the Council Chambers. Phase 2 of the project will include new microphones, which will be completed later pending equipment. • City Hall:
o Phones: IT worked with all departments to adjust the City’s call flows to eliminate the on-hold music.
o Finance Department: IT assisted Finance with moving and setting-up equipment in their new workspaces.

Staff
• Recruitment: The Administrative Services Department welcomed Ian Huff, the new IT Help Desk Technician, to the team. Ian is training on how Pismo Beach delivers IT services. • Development:
o SunRidge User Conference: The IT Manager attended the annual SunRidge user conference for the Computer Aided Dispatch and Records Management Software. IT is assisting the Police Department in the process of migrating to this software. o MISAC 2022 Conference: The IT Manager attended the Municipal Information Systems Association of California (MISAC) 2022 Conference. The conference sessions focused on cybersecurity, staff retention, and working remotely.

9.B-4Council Agenda 11-15-2022
Attachment 1
Packet Page 17

Accounts Payable October September August
Invoices Entered / Checks Issued:404/269 779/343 671/244 New purchase orders issued:8 14 22
New contract purchase orders issued:2 12 10
Change Orders / Amended PO's issued:9 7 7
Total dollar amount of all PO's issued:202,450$ 1,222,363$ 2,894,219$ Total Invoices paid:2,767,378$ 2,337,290$ 3,499,674$ Total No. of Voids processed: 2 6 4
Total Dollar amount of Voids:1,426$ 2,479$ 1,884$ Business License Certificates
Renewed Licenses issued / New Licenses 304/39 518/56 183/26 Utility Billing
Downtown: Routine Utility Bills:2813 0 2811
Delinquent Utility Bills:0 172 0
Shell Beach: Routine Utility Bills:0 2,141 0
Delinquent Utility Bills: 157 0 140
Cash receipts:842,027$ 997,082$ 953,565$ Customer accts paid/ACH Direct/Online Bills:2104/256/608 2502/335/687 2526/257/605 48 Hour Notices / Water Lock-Outs:0/0 0/0 0/0
Meter Sets / Meter Change Outs / Demos:0/1/0 2/6/0 3/8/0 Change Orders / Closing Bills:40/32 40/34 50/33
Billing Adjustments / Deposits:10/26 5/53 12/46
Delinquent Closed Invoices / Write-Offs:0/0 0/0 0/0
Administrative Services Department
Statistical Activity Report - October 2022

9.B-5Council Agenda 11-15-2022
Attachment 1
Packet Page 18

CITY MANAGER’S OFFICE ACTIVITY REPORT OCTOBER 2022

 Met with Council Members to discuss various topics of interest.  Met with Department Heads to discuss various topics of interest.  Attended s Operations Board of Directors Meeting
 Met with Senator Laird to discuss continued operation of Diablo Canyon Nuclear Power Plant and next steps
 Provided a City update at the South County Chambers of Commerce luncheon  Participated in the Coastal Cities Group Leadership Committee monthly meeting  Traveled to Sacramento for the California City Management Foundation Board Meeting
 Met with Cal Cities and CalPERS senior staff to discuss issues of importance regarding staffing in cities particularly related to proposed regulations  Met with the Chapman Estate Foundation board members to discuss a new license agreement
 Participated in the League of CA Cities City Managers Department Executive Committee meeting
 Attended “Pumpkins in the Park” to assist with outreach for Pismo Voice

9.B-6Council Agenda 11-15-2022
Attachment 2
Packet Page 19

October 2022 CDD Monthly Report 1

PISMO BEACH COMMUNITY DEVELOPMENT DEPARTMENT
MONTHLY REPORT FOR OCTOBER 2022
BUILDING DIVISION٠CODE COMPLIANCE•PLANNING

BUILDING DIVISION

ISSUED PERMITS SUMMARY
Date Permit
Number
Address Description Valuation Total Fees
10/03/2022 B22-000342 791 Stratford
Street
Solar PV -
Residential
$ 12,014.00 $ 445.98
10/03/2022 B22-000390 2580 Spyglass
Drive
Plumbing,
Mechanical &
Electrical
$ - $ 139.22
10/03/2022 B22-000392 223 Indio Drive Plumbing,
Mechanical &
Electrical
$ - $ 452.09
10/03/2022 B22-000400 1055 Canyon
Lane
Solar PV -
Residential
$ 18,000.00 $ 459.98
10/03/2022 B22-000393 320 Foothill
Road
Residential
Alteration
$ 5,705.00 $ 518.72
10/03/2022 B22-000407 760 Mattie Road Commercial
Alteration
$ 56,000.00 $ -
10/04/2022 B22-000244 901 Oak Park
C102 & C103
Plumbing,
Mechanical &
Electrical
$ - $ 386.87
10/04/2022 R21-000015 1081 Longview
Avenue
Revision $ - $ 97.47 10/04/2022 B22-000418 2757 Shell Beach
Road
Re-roof
Commercial
$ 25,000.00 $ 190.32
10/06/2022 B22-000358 147 Stimson
Street
Sign -
Illuminated
$ 10,000.00 $ 957.49
10/06/2022 B21-000536 147 Stimson
Street
Commercial
Alteration
$ 80,000.00 $ 4,588.62

9.B-7Council Agenda 11-15-2022
Attachment 3
Packet Page 20

October 2022 CDD Monthly Report 2
10/07/2022 B22-000420 203 Cuyama
Avenue
Re-roof
Residential
$ 5,900.00 $ 99.59
10/13/2022 B22-000425 122 Santa Fe
Avenue
Re-roof
Residential
$ 7,200.00 $ 85.76
10/14/2022 B22-000444 2070 Costa Del
Sol
Residential
Alteration
$ 15,000.00 $ 541.84
10/14/2022 B22-000445 2084 Costa Del
Sol
Residential
Alteration
$ 15,000.00 $ 541.84
10/14/2022 B22-000436 2630 Spyglass
Drive
Re-roof
Residential
$ 29,000.00 $ 89.59
10/14/2022 B22-000440 428 Ocean View
Avenue
Re-roof
Residential
$ 5,866.00 $ 99.58
10/17/2022 B22-000292 185 El Portal
Drive
Residential
Alteration
$ 56,000.00 $ 3,474.05
10/19/2022 B22-000413 111 Surf Street Solar PV -
Residential
$ 6,669.00 $ 445.98
10/19/2022 B22-000104 2131 Price Street Commercial
Alteration
$ 20,000.00 $ 1,739.95
10/20/2022 B22-000462 971 Terry Drive Plumbing,
Mechanical &
Electrical
$ - $ 138.80
10/20/2022 B22-000459 507 San Luis
Avenue
Re-roof
Residential
$ 6,500.00 $ 85.67
10/20/2022 B22-000452 725 White Oak
Boulevard
Re-roof
Residential
$ 8,150.00 $ 85.88
10/20/2022 B22-000457 241 Pier Avenue Re-roof
Residential
$ 10,080.00 $ 86.13
10/21/2022 B22-000467 1270 Costa
Brava
Plumbing,
Mechanical &
Electrical
$ - $ 125.14
10/21/2022 B22-000416 113
Beachcomber
Residential
Alteration
$ 15,000.00 $ 1,052.73

9.B-8Council Agenda 11-15-2022
Attachment 3
Packet Page 21

October 2022 CDD Monthly Report 3
10/21/2022 B22-000463 341 Main Street Re-roof
Residential
$ 5,000.00 $ 85.47
10/24/2022 B22-000354 2295 Shell Beach
Road
Solar PV -
Residential
$ 60,589.00 $ 1,538.71
10/24/2022 B22-000397 201 Miguelito
Way
Solar PV -
Residential
$ 27,656.00 $ 643.58
10/26/2022 B22-000471 729 White Oak
Boulevard
Re-roof
Residential
$ 8,500.00 $ 85.93
10/26/2022 B22-000472 2042 Costa Del
Sol
Re-roof
Residential
$ 15,000.00 $ 86.77
10/26/2022 B22-000473 2142 Costa Del
Sol
Re-roof
Residential
$ 15,000.00 $ 86.77
10/26/2022 B22-000474 2000 Costa Del
Sol
Re-roof
Residential
$ 15,000.00 $ 86.77
10/28/2022 B22-000435 148 El Viento Solar PV -
Residential
$ 6,156.00 $ 445.98
10/28/2022 B22-000468 340 Harloe
Avenue
Plumbing,
Mechanical &
Electrical
$ - $ 138.80
10/28/2022 B22-000475 971 Taft Street Plumbing,
Mechanical &
Electrical
$ - $ 191.65
10/28/2022 B22-000464 677 Shamrock
Lane
Residential
Alteration
$ 40,000.00 $ 3,063.80
10/28/2022 B22-000415 330 Leeward
Avenue
Residential
Alteration
$ 5,000.00 $ 557.29
10/31/2022 B22-000423 200 Coral Court Solar PV -
Residential
$ 8,000.00 $ 445.98
Total 39 $ 612,985.00 $ 24,386.79

9.B-9Council Agenda 11-15-2022
Attachment 3
Packet Page 22

October 2022 CDD Monthly Report 4

NEW APPLICATIONS SUMMARY
Date Permit
Number
Address Description Valuation
10/03/2022 B22-000421 261 Encanto Avenue Solar PV - Residential $ 24,069.00 10/03/2022 B22-000420 203 Cuyama Avenue Re-roof Residential $ 5,900.00 10/04/2022 B22-000422 152 Naomi Drive Residential Alteration $ 20,000.00 10/06/2022 B22-000426 290 Reef Court Solar PV - Residential $ 28,400.00 10/06/2022 B22-000430 333 Five Cities Drive Commercial Alteration $ 400,000.00 10/07/2022 B22-000413 111 Surf Street Solar PV - Residential $ 6,669.00 10/07/2022 B22-000433 138 Summit Drive Residential Addition $ 150,000.00 10/07/2022 B22-000434 2689 Spyglass Drive Residential Alteration $ 80,220.00 10/10/2022 B22-000419 601 Cypress Street Fire Alarm $ 30,000.00 10/11/2022 B22-000397 201 Miguelito Lane Solar PV - Residential $ 27,656.00 10/11/2022 B22-000436 2630 Spyglass Drive Re-roof Residential $ 29,000.00 10/12/2022 B22-000402 690 Vista Pacifica Circle Solar PV - Residential $ 29,057.00 10/13/2022 B22-000432 2171 Costa Brava Road Solar PV - Residential $ 26,733.00 10/13/2022 B22-000435 148 El Viento Solar PV - Residential $ 6,156.00 10/13/2022 B22-000425 122 Santa Fe Avenue Re-roof Residential $ 7,200.00 10/13/2022 B22-000438 2171 Costa Brava Re-roof Residential $ 19,000.00 10/13/2022 B22-000440 428 Ocean View
Avenue
Re-roof Residential $ 5,866.00
10/14/2022 B22-000441 2737 Barcelona Single Family Residence $ 470,599.04 10/14/2022 B22-000444 2070 Costa Del Sol Residential Alteration $ 15,000.00 10/14/2022 B22-000445 2084 Costa Del Sol Residential Alteration $ 15,000.00 10/17/2022 R22-000071 1241 Dolliver Street Revision $ - 10/17/2022 R22-000072 591 Five Cities Drive Revision $ -

9.B-10Council Agenda 11-15-2022
Attachment 3
Packet Page 23

October 2022 CDD Monthly Report 5
10/17/2022 B22-000423 200 Coral Court Solar PV - Residential $ 8,000.00 10/17/2022 B22-000450 750 Price Street Sign - Illuminated $ 4,500.00 10/17/2022 B22-000449 110 Baker Lane Solar PV - Residential $ 19,891.20 10/17/2022 B22-000446 1090 Dolliver Street Solar PV - Residential $ 24,140.50 10/17/2022 B22-000385 241 Encanto Avenue Solar PV - Residential $ 34,686.00 10/17/2022 B22-000451 2121 Price Street Commercial Alteration $ 58,000.00 10/18/2022 B22-000454 1353 Shell Beach Road Solar PV - Commercial $ 66,800.00 10/18/2022 B22-000456 24 La Gaviota Solar PV - Residential $ 11,000.00 10/18/2022 B22-000447 2710 Spyglass Drive Residential Alteration $ 15,000.00 10/19/2022 B22-000458 113 Marian Way Residential Alteration $ 50,000.00 10/20/2022 B22-000462 971 Terry Drive Plumbing, Mechanical & Electrical
$ -
10/20/2022 B22-000453 333 Five Cities Drive Commercial Alteration $ 15,000.00 10/20/2022 B22-000452 725 White Oak
Boulevard
Re-roof Residential $ 8,150.00
10/20/2022 B22-000457 241 Pier Avenue Re-roof Residential $ 10,080.00 10/20/2022 B22-000459 507 San Luis Avenue Re-roof Residential $ 6,500.00 10/21/2022 B22-000467 1270 Costa Brava Plumbing, Mechanical & Electrical
$ -
10/21/2022 B22-000469 375 El Portal Drive Solar PV - Residential $ 18,980.00 10/21/2022 B22-000463 341 Main Street Re-roof Residential $ 5,000.00 10/24/2022 B22-000460 57 La Gaviota Solar PV - Residential $ 6,080.00 10/25/2022 B22-000471 729 White Oak
Boulevard
Re-roof Residential $ 8,500.00
10/25/2022 B22-000472 2042 Costa Del Sol Re-roof Residential $ 15,000.00 10/25/2022 B22-000473 2142 Costa Del Sol Re-roof Residential $ 15,000.00 10/25/2022 B22-000474 2000 Costa Del Sol Re-roof Residential $ 15,000.00

9.B-11Council Agenda 11-15-2022
Attachment 3
Packet Page 24

October 2022 CDD Monthly Report 6
10/25/2022 B22-000470 241 Pier Avenue Re-roof Residential $ 10,200.00 10/26/2022 B22-000468 340 Harloe Avenue Plumbing, Mechanical & Electrical
$ -
10/27/2022 B22-000475 971 Taft Street Plumbing, Mechanical & Electrical
$ -
10/28/2022 B22-000465 575 Price Street Commercial Alteration $ 55,000.00 10/31/2022 B22-000439 203 Palomar Avenue Solar PV - Residential $ 16,000.00 10/31/2022 B22-000477 2151 Shoreline Drive Plumbing, Mechanical & Electrical
$ -
10/31/2022 B22-000480 1972 Costa Del Sol Re-roof Residential $ 15,000.00 10/31/2022 B22-000481 1986 Costa Del Sol Re-roof Residential $ 15,000.00 Total 53 $ 1,923,032.74

SPECIAL PROGRAMS AND PROJECTS:
• Development Review Team Meeting was held weekly, and the pending review report was reviewed to ensure timely return on plan reviews among all divisions in the development process. • Staff continues to prepare the 2022 Code adoption
• Staff attended California Building Officials training • Staff completed interviews for a new Code Enforcement Officer and are working with HR regarding making an offer.

INSPECTIONS PERFORMED: 164

PLAN REVIEWS:
• Building: 48
• Planning: 4
• Engineering: 1

CODE COMPLIANCE

CASE SUMMARY:
• Cases Closed: 0
• Cases Opened: 6
• Site Visits: 4
• Notice of Violation / Citation: 4

PLANNING DIVISION

9.B-12Council Agenda 11-15-2022
Attachment 3
Packet Page 25

October 2022 CDD Monthly Report 7
CITY COUNCIL AND ADVISORY BOARD MEETINGS:
• City Council: Staff attended the October 4, 2022, and October 18, 2022, regular meetings. Staff also prepared reports for the November 1, 2022, and November 15, 2022, regular meetings. • Planning Commission: Staff attended the October 11, 2022, and October 25, 2022, regular meetings. • Parking Advisory Committee: The October PAC meeting was cancelled in preparation of a special meeting in November to continue work on the Parking Management Plan. Staff met with Jack Krasner to orient him to the PAC following his appointment.

NEW APPLICATIONS SUMMARY:

Project Number Date Received Address Description
P22-000115 10/04/2022 333 Five Cities Drive New wall and blade signs P22-000116 10/11/2022 246 Pomeroy New wall sign
P22-000117 10/17/2022 651 Dolliver New wall sign
P22-000118 10/26/2022 333 Five Cities Drive New wall sign P22-000119 10/26/2022 250 Elaine
Accessory storage shed – 120 sq.
ft.

P22-000120 10/26/2022 196 Irish Way Deck, terraces, retaining walls

PROJECT ADMINISTRATION:
• Administrative Reviews: 41
• Discretionary Reviews: 36
• Plan Checks: 34
• Site Inspections: 16

0%
10%
20%
30%
40%
50%
60%
70%
80%
Week 1 Week 2 Week 3 Week 4

ACTIVE PROJECT REVIEWS
Administrative Discretionary

9.B-13Council Agenda 11-15-2022
Attachment 3
Packet Page 26

October 2022 CDD Monthly Report 8
SPECIAL PROJECTS UPDATE/OTHER:
• APA California Conference: Staff attended the California Chapter of the American Planning Association conference in Anaheim from Saturday, October 1, to Tuesday, October 4, 2022. This was the first in-person conference for the Chapter since prior to the pandemic. • GP/LCP: Work continued on the revisions memos following the cancellation of the October Joint Workshop. Additionally, staff is comprehensively reviewing the Draft Zoning Code again considering comments made through the previous Joint Workshops. Staff had a discussion with one of the public commentors at the last Joint Workshop to better understand their comments. • Development Review Team: Staff attended the weekly development review team meetings. • Central Coast Blue: Staff coordinated a meeting with Coastal staff regarding CCB permitting. Staff attended a preliminary project team meeting regarding CCB in preparation for a meeting with Coastal Commission staff. Staff attended a meeting with Coastal Commission staff regarding Coastal Development Permit processing options. Staff attended a meeting with County planning regarding Coastal Development Permit processing options, including potential consolidation, and application materials required for processing.
• Personnel: A recruitment has been opened for the Administrative Secretary position in the Planning Division. Interviews were held for the Code Enforcement Officer position in the Building Division. Staff continues to cover administrative tasks while recruiting for a new Administrative Secretary. We would like to appreciate the City Clerk, Management Services, and all other City departments for their assistance during this period.
• Coastal Cities Group: Staff attended the SLR strategies staff meeting. • Training: Staff attended an LCW webinar training.
• SB 9: Staff continues to coordinate with Coastal Commission staff on analysis of parcels impacted by addressing sea-level rise in SB 9 applications.
• Price Historical Park: Staff met to discuss the intended improvements at the Price Historical Park. • Neighborhood Event: Staff attended the Highland Park event and helped at the Pismo Voice table. • Façade Improvement Rebate Program: Staff prepared a report evaluating the program for the City Council agenda on November 1, 2022.
• Housing Action Team Meeting: Staff attended the monthly regional housing action team meeting. • Management Training Academy: Staff participated in the monthly Management Training Academy hosted by the City’s Police Department.

9.B-14Council Agenda 11-15-2022
Attachment 3
Packet Page 27

MANAGEMENT SERVICES DEPARTMENT

MONTHLY ACTIVITY REPORT

October 2022

MANAGEMENT SERVICES DEPARTMENT

CITY CLERK

ADVISORY BODIES
• Onboarded one new Parking Advisory Committee Member for a partial term, to fill the vacancy left by a recent resignation.
• New automated Chamber camera equipment was launched for the October 25, 2022 Planning Commission meeting. Improvements and refinements will continue over the coming months.

ELECTIONS & POLITICAL REFORM
• Vote-by-mail ballot dropbox in the City Hall lobby opened on Monday, October 10, 2022. The box was available during the City’s business hours, through 5:00 p.m. on Election Day. • Remaining 2nd Pre-Election Statements (FPPC Form 460 Campaign Finance Statements) for the November 8, 2022 Election were received and posted.
• Received an amended 1st Pre-Election Campaign Statement (Form 460) for the November 8, 2022 General Election.
• Received two Form 497 24-hour contribution reports for filing.

RECORDS MANAGEMENT
• Ongoing review of numerous records requests.
• Ongoing coordination with the City’s claims handlers and counsel to provide relevant records. • Completed delivery of discovery in one litigation matter.

CPRA REQUESTS COMPLETED
• Boardman, 850 Merced Building Permits
• Butler, Pismo Lighthouse Suites and Shore Cliff Hotel • Clark, 1980s As-Built Plans
• Felix, Pismo Lighthouse Suites
• Felix, Shore Cliff Hotel
• Haupt, 2171 Shoreline Permit and Plans
• Honeycutt, 2131 Price Sprinkler Plans
• Jager, Cliffs Hotel 911 Call
• Lumanog, Ventana Tennis Courts Engineering Services
• Parolini, 850 Merced Building Records
• Pratt, Price House Lease Agreement
• Robinson, 229 Leeward Avenue Building Permit
• Rodgers, Pismo Lighthouse Suites
• Rodgers, Shore Cliff Hotel
• Rothermel, Pismo Lighthouse Suites
• Rothermel, Shore Cliff Inn

9.B-15Council Agenda 11-15-2022
Attachment 4
Packet Page 28

• Ryerson, Devoll Arrest Reports
• Schwaegerle, 850 Merced Building Permits
• Souza, Souza Records
• Walta, 372 Boeker Plans
• Wasemiller, 871 Shaffer Lane Plans
• Wasemiller, 871 Shaffer Lane Plans
• Wentzel, Rebecca Raymond

HUMAN RESOURCES
• Recruitment:
o PT Community Service Technician
o PT Recreation Coordinator I & II
o PT Recreation Office Assistant
o PT Maintenance Worker
o Administrative Secretary - CDD
o Parking Enforcement Technician
o Accounting Clerk
Maintenance Worker (Sanitation Tech, Landscape Tech) – To Open • Interviews:
o Code Enforcement Officer – Finals 10/10
o PT Community Service Technician – 10/27
o PT Recreation Office Assistant - TBD
o PT Recreation Office Assistant
o PT Recreation Coordinator I & II
o Administrative Secretary – CDD

• Backgrounds:
o Public Safety Dispatcher
o PT Parking Enforcement (2)
o IT Tech
o Maintenance Worker
o Code Enforcement Officer
o PT Community Service Technician

• Offers:
o Dispatch Lateral
o IT Tech
o Maintenance Worker

• New Employee Orientation
o Public Safety Dispatcher
o Parking Enforcement Officer
o IT Tech
o Dispatcher

9.B-16Council Agenda 11-15-2022
Attachment 4
Packet Page 29

TRAINING AND STAFF DEVELOPMENT
• The Assistant City Manager and HR Management Analyst attended the 27th Annual California JPIA Risk Management Educational Forum in Santa Barbara. • The Police Department hosted the most recent Management/Supervisory Academy program at the Police Station. Next month’s department will be Tourism and Events. • Management and mid-management staff attended a webinar training hosted by Liebert, Cassidy, Whitmore on Managing the Marginal Employee.

LEGISLATIVE AFFAIRS
• Continued coordination with State Lobbyist and various professional development associations on the implementation of new laws on January 1, 2023.
• Staff met with the City Attorney to review legislative impacts effecting employee labor laws and modifications to drug testing procedures for new hire employees.

PUBLIC OUTREACH / PUBLIC INFORMATION
• New Postings:
o Media Interview- Paving Project
o Water savings tips: Mulch
o Election Information on Voter Information Guide
o Chapman Estate Open Gates extended through the end of the year

RISK MANAGEMENT

LIABILITY CLAIMS RECEIVED

• 2022-10-17 Universal Precast Concrete, Gutierrez, Bravo, Beard - beach slide • 2022-10-20 Miracle Construction Company, Diaz, Brinkerhoff - beach slide

OTHER
• Conducted quarterly safety training for Management Services, on the subject email phishing and spoofing.
• Conducted Media interviews with KSBY on the Paving Project and the Pismo Clams. • Held quarterly Safety Committee meeting to review all the claims, workers compensation cases, trainings, inspections, and other items from the previous quarter, and receive an update from Tim Karcz from CJPIA.
• City Clerk clerked October 11 and 25, 2022 Planning Commission meetings • Chamber Equipment video installation has been completed and we are finalizing the settings and configuration with the vendor. We completed a run through during the Planning Commission meeting and were impressed with the system capabilities and will continue to refine the system over the next couple of months to ensure it is working as intended.

9.B-17Council Agenda 11-15-2022
Attachment 4
Packet Page 30

John Owens, Acting Unit Chief

Prepared by: Michelle Pearson, Administrative Assistant Submitted by: Paul Lee, Battalion Chief

Fire Prevention
• 31-Plan reviews (Building/Planning)
• 15-Site visits
• 7-Rough/hydro inspections-residential system
• 1-Public Service Assist
• 4-Fire Final
• 3-Emergency response
• 2-AB38 Inspection
• 4-Knox updates
• 4-Special Event inspection
• 1-Fire Investigation (Mutual Aid)
• 2-Commercial Fire System Issue with Firewatch
• Special Event Committee meeting
• Weed Abatement inspection/concerns
• Mobile Home Park Access Issue
• 4th St/Five Cities VMP Prep
• Building/Planning meeting
Administration/Vegetation Management
• Week of 10/3- An OTS grant for $46,000 has been awarded to the City for Extrication Equipment and Airbags for Rescue 64. This equipment will help reduce the amount of time someone is pinned or trapped in a vehicle. The overall goal is to get an injured person to the hospital in under 60 minutes (Golden Hour) after an accident. A new model of the jaws of life was demonstrated to the City and we are pleased with what we have seen. This new model is stronger, better battery life and works in salt water.

• The draft Pismo CWPP is being reviewed; it is an outstanding document. This document will help in the decision-making process as it relates to suppression October 2022 Activity Report

9.B-18Council Agenda 11-15-2022
Attachment 5
Packet Page 31

and prevention measures for wildland fires. This week a final meeting with the contractor was held prior to the document being reviewed by the FSC. • The Clam Festival weekend was well attended and without any significant incidents. Fire personnel assisted with burying “clams” for the kids, driving our vehicles in the parade as well as Captain Byrnes completing vendor inspections.

Lifeguards/Junior Lifeguard Program
• The Lifeguard season has officially ended but Captain Pacheco is able to utilize our Lifeguard staff to work the City Surfing Special Events such as the Scholastic Surf Competition scheduled for 10/30. We have two more longer surfing events scheduled for December and January that we intend on staffing as well.

9.B-19Council Agenda 11-15-2022
Attachment 5
Packet Page 32

October 2022 Stats

Number of Calls % Type of Incident
0 0.00%Debris
82 78.10%Emergency Medical
6 5.71%Fire Alarms
0 0.00%Fire Menace Standby
0 0.00% Flooding
0 0.00%Gas Leak
1 0.95%Other
12 11.43%Public Service Assistance
0 0.00%Smoke Check
0 0.00%Structure Fire
4 3.81%Traffic Collision
0 0.00%Vehicle Fire
0 0.00%Wildfire
105 100.00%
Incidents by City Response Area
Medicals Other % Descriptive Area
3 3 5.71% Palisades A
7 1 7.62% Spyglass B
4 1 4.76%Shell Beach Village C
1 1 1.90%Mattie Rd D
3 1 3.81%Shorecliff E
20 3 21.90% Downtown F
4 2 5.71% Heights G
11 5 15.24%Ventana H
17 3 19.05%Trailer Parks I
7 3 9.52%Five Cities Dr J
5 0 4.76%James Way K
Total 105 100.00%

9.B-20Council Agenda 11-15-2022
Attachment 5
Packet Page 33

Pismo Beach Police Department
1000 Bello Street, Pismo Beach, CA 93449
(805) 773-2208
www.pismobeach.org/police
Monthly Activity & Crime Statistics Report
October 2022
Date Posted_________
Submitted: 11/4/2022 9.B-21Council Agenda 11-15-2022
Attachment 6
Packet Page 34

PISMO BEACH POLICE DEPARTMENT
OCTOBER 2022

MONTHLY ACTIVITY AND CRIME STATISTICS

Table of Contents

Activity Report
Office of the Chief…………………………………………………………………….… 1
Training Report…………………………………………………………………………. 1
Volunteers Summary…………………………………….…………………………….. 2
Overtime & Salary………………………………………………………………………. 2

Investigations Statistics
Routine Investigations………………………………………………………………….. 3
Investigation Management…………………………………………………………….. 3
Property & Evidence……………………………………………………………………. 3
Compliance & Permits………………………………………………………………….. 3
Special Operations……………………………………………………………………… 4

Crime Statistics
Workload Trends & Crime Statistics………………………………………………….. 5 Arrests, Citations, & Traffic Activity…………………………………………………… 6 Heatmap & Activity Analysis…………………………………………………………… 7

9.B-22Council Agenda 11-15-2022
Attachment 6
Packet Page 35

PISMO BEACH POLICE DEPARTMENT
OCTOBER 2022

MONTHLY ACTIVITY AND CRIME STATISTICS

OFFICE OF THE CHIEF

1. In honor of Breast Cancer Awareness Month, all patrol staff wore pink badges throughout October.

2. From October 4 - 7, 2022, Chief Smith attended the JPIA Risk Management Education Forum.

This event features world-class keynotes and knowledge experts in the field of risk.

3. From October 14 – 18, 2022, Chief Smith and Commander Trimble attended the International Association of Chiefs of Police (IACP) Conference. These four days of education and networking included quality training and more than 600 vendors showcasing products and services to assist law enforcement.

4. On October 19 – 20, 2022, Police staff and students from both local schools escorted the ‘Honor Ride for Wounded Veteran’s’ through the city.

5. On October 27 and 31, 2022, Police staff, along with City Council Members and City Hall Staff, welcomed the students from Happy Time Preschool to walk our hallway to collect Halloween candy.

6. On October 28, 2022, patrol staff handed out candy and glow sticks to children at the Shell Beach Elementary Trunk or Treat Event.

7. On October 29, 2022, the Police Department participated at Pumpkins in the Park, including tours of the Mobile Command Vehicle.

8. On October 31, 2022, Police staff greeted the students in each classroom at Shell Beach Elementary to remind them of important safety tips while out Trick-or-Treating.

MONTHLY TRAINING REPORT

Type of Training Attending Personnel Hours
SWAT Monthly Training 2 Officers 30
Lexipol Daily Training Bulletins 20 Sworn, 9 Non-Sworn 43.5 IACP Annual Conference 1 Chief, 1 Commander 64
JPIA Risk Management Educational Forum 1 Chief 24
Post CPT Hearsay Testimony Training 20 Sworn 40
Dispatch Academy (Week 2) 1 Dispatcher 40
Total Hours 241.5 Hours

9.B-23Council Agenda 11-15-2022
Attachment 6
Packet Page 36

PISMO BEACH POLICE DEPARTMENT
OCTOBER 2022

MONTHLY ACTIVITY AND CRIME STATISTICS

POLICE VOLUNTEERS SUMMARY

Volunteers were active throughout October. They conducted court runs, records, parking enforcement, vacation checks and property/laboratory deliveries. They also assisted at Pumpkins in the Park.

Volunteer Service Hours
Patrol 13.50
Special Events 18.00
Administrative 89.25
Call-Outs 0.00
Training/Misc. 1.75
Total Hours 122.50

OVERTIME & SALARY

Total Overtime Budgeted FY 22/23 $272,877.00
Total Overtime Spent YTD $100,179.96
Percentage Overtime Spent YTD 36.71%

Total Salary Budgeted FY 22/23 $3,917,960.18
Total Salary Spent YTD $1,039,125.30
Percentage Salary Spent YTD 26.52%

9.B-24Council Agenda 11-15-2022
Attachment 6
Packet Page 37

PISMO BEACH POLICE DEPARTMENT
OCTOBER 2022

MONTHLY ACTIVITY AND CRIME STATISTICS

INVESTIGATIONS STATISTICS

Routine Investigations
Arrests 0
Total Cases Worked 20
- Property Crimes 7
- Person Crimes 0
- Sex Crimes 6
- Other Criminal 4
- Other Non-Criminal 3
Supplemental Reports Completed 16
- Closed Cases – Misdemeanor 1
- Closed Cases – Felony 5
- Cases Filed with DA – Misdemeanor 3
- Cases Filed with DA – Felony 3
- Informational only 4

Investigation Management
Cases Assigned – Current 18
Cases Reviewed 63
Missing Person Cases Reviewed 1

Property and Evidence
New Property Cases 1
Property Purged 486
Physical Property Booked 246
Digital Property Booked 295
Property Auction 0
Evidence Processed 4
Fingerprint Submitted 1

Compliance and Permits
Annual PC 290 Registration Renewals 0
CCW Background Investigations 1
H&S 11590 Registration 0
PC 451.7 Arson Registration 0
Massage Establishment/Practitioner Permits 9

9.B-25Council Agenda 11-15-2022
Attachment 6
Packet Page 38

PISMO BEACH POLICE DEPARTMENT
OCTOBER 2022

MONTHLY ACTIVITY AND CRIME STATISTICS

Special Operations
Massage Sting Operation 0
- Arrests 0
290 PC Compliance 0
Alcohol Sting Operation 0
- Arrests 0
Tobacco Sting Operations 0
Prostitution Sting Operations 0
Warrants Authored 4
Warrants Served 4

9.B-26Council Agenda 11-15-2022
Attachment 6
Packet Page 39

WORKLOAD Oct 2022 Oct 2021 Sep 2022 Variant % Change YTD 2022 YTD 2021 Variant % Change Calls For Service 2,107 2,350 2,281 -174 -7.6%23,134 25,080 -1,946 -7.8% Community-Generated Calls 1051 1424 1265 -214 -17%13,239 14,474 -1,235 -9% Self-Initiated Activities 1056 926 1016 40 4%9,895 10,606 -711 -7% Incident Reports 192 220 217 -25 -12%2,157 2,536 -379 -15% 9-1-1 Calls 639 609 719 -80 -11%8,061 7,429 632 9%
Arrests 125 155 128 -3 -2%1,185 1,589 -404 -25%
Citations & Warnings 244 338 240 4 2%2,250 2,596 -346 -13% Parking Citations 829 1,200 829 0 0%9,220 7,432 1,788 24% Total Workload 4,136 4,872 4,414 -278 -6%46,007 46,662 -655 -1% PART 1 CRIMES
Arson 0 0 0 0 0%1 0 1 100%
Assault (Aggravated)0 2 1 -1 -100%17 24 -7 -29%
Auto Theft 0 3 1 -1 -100%12 23 -11 -48%
Burglary 4 5 4 0 0%74 60 14 23%
Homicide 0 0 0 0 0%0 0 0 0%
Larceny 9 16 14 -5 -36%178 183 -5 -3%
Rape 0 0 1 -1 -100%3 1 2 200%
Robbery 0 0 0 0 0%7 5 2 40%
Total Pt 1 Crimes 13 26 21 -8 -38%292 296 -4 -1%
0 0%0%
PART 2 CRIMES
Assault (Simple)2 7 6 -4 -67%53 46 7 15%
Disorderly Conduct 4 11 8 -4 -50%84 99 -15 -15%
DUI 7 6 7 0 0%82 148 -66 -45%
Forgery/Fraud 4 4 8 -4 -50%33 46 -13 -28%
Narcotics Offenses 26 36 21 5 24%262 397 -135 -34%
Sex Offense 2 1 3 -1 -33%21 9 12 133%
Vandalism/Graffiti 7 4 2 5 250%81 76 5 7%
Warrant Arrest 55 41 33 22 67%403 410 -7 -2%
Weapons 2 4 3 -1 -33%25 54 -29 -54%
Total Pt 2 Crimes 109 114 91 18 20%1,044 1,285 -241 -19% OCTOBER 2022

PISMO BEACH POLICE DEPARTMENT

MONTHLY ACTIVITY AND CRIME STATISTICS
1424 1411 1322 1437 1299 1210 1271
2249
1407 1602
1339 1265 1051
926 931 787 775 879 1124 997
1309
890
1216
944 1016 1056
220 192 182 215 228 203 199 213 221 263 200 217 200
Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 WORKLOAD TREND Community-Generated Calls Self-Initiated Activities Incident Reports

9.B-27Council Agenda 11-15-2022
Attachment 6
Packet Page 40

ARRESTS Oct 2022 Oct 2021 Sep 2022 Variant % Change YTD 2022 YTD 2021 Variant % Change Adult 123 155 128 -5 -4%1,159 1,578 -419 -27%
Juvenile 2 0 0 2 %26 11 15 136%
Total Arrests 125 155 128 -3 -2%1,185 1,589 -404 -25%
0%
CITATIONS 0%
Traffic Violation Citations 104 115 101 3 3%1,053 1,226 -173 -14% Infraction 74 67 79 -5 -6%742 711 31 4%
Hazardous 0 0 0 0 0%0 2 -2 -100%
Misdemeanor 30 48 23 7 30%313 513 -200 -39%
Felony 0 0 0 0 0%0 2 -2 -100%
All Other Citations 111 148 146 -35 -24%1,246 1,406 -160 -11% Warnings 29 18 36 -7 -19%470 551 -81 -15%
Parking Citations 790 1,084 708 82 12%10,733 9,992 741 7% Total Citations 1,034 1,365 991 43 4%13,502 13,175 327 2% TRAFFIC ACTIVITY 0%
Traffic Stops 332 409 314 18 6%3,230 4,369 -1,139 -26%
Traffic Accidents 6 12 6 0 0%132 144 -12 -8%
DUI 0 0 0 0 0%15 24 -9 -38%
Hit & Run 0 0 2 -2 -100%24 29 -5 -17%
Injury 0 3 1 -1 -100%31 36 -5 -14%
Property Damage Only 6 9 5 1 20%100 107 -7 -7%
0 0 0 0 0
0 0
0 4
0 2
1 4

MONTHLY ACTIVITY AND CRIME STATISTICS
OCTOBER 2022

PISMO BEACH POLICE DEPARTMENT
273
314
332
172
168
165
37 48
34 AUG
SEP
OCT
3 MONTH TRAFFIC STOPS ACTIVITY
Led to Arrest
Led to Citation
Vehicle Stops
17%
17%
33%
33%

MONTHLY TRAFFIC COLLISION
CAUSES
DUI
Failed to Stop
Failed to Yield
Other
Unsafe Speed
Unsafe Start/Back
Unsafe Turn/Lane
Change

9.B-28Council Agenda 11-15-2022
Attachment 6
Packet Page 41

Jun 2019 Jul 2019
61%of reported actvity occurred between the hours of 7:00 a.m. and 6:59p.m. 39%of reported activity occurred between the hours of 7:00 p.m. and 6:59 a.m. 40%of reported activity occurred on the weekend.

Monthly Activity Analysis

PISMO BEACH POLICE DEPARTMENT
OCTOBER 2022

MONTHLY ACTIVITY AND CRIME STATISTICS
Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10 Zone 11 Zone 12 Zone 13 (OUT)
Percent 0.0%4.1%3.1%2.6%16.9%13.8%38.5%10.3%1.5%0.5%0.5%5.6%2.6% 0 8 6 5
33 27
75 20
3 1 1
11 5
Case Reports Per Zone
Sun
19%
Mon
12%
Tues
11%Wed
10%
Thurs
14%
Fri
13%
Sat
21%

ACTIVITY BY DAY OF WEEK
Days
61%
Nights
39%

ACTIVITY BY SHIFT

9.B-29Council Agenda 11-15-2022
Attachment 6
Packet Page 42

PUBLIC WORKS AND ENGINEERING DEPARTMENT
OCTOBER 2022 ACTIVITY REPORT

CAPITAL IMPROVEMENT PROJECTS
Police Department Annex
• Preliminary site layouts being development by consultant.

Pier Ave Stairs Closure
• Repair options will be presented to City Council on November 15, 2022.

Toucan Terrace Sewer Pipeline Trestle Bridge
• Authorization to Bid approved by Council on October 18, 2022.

North Shell Beach Road Storm Drain Repair
• Authorization to Bid approved by Council on October 18, 2022.

Chumash and Palisades Park Playgrounds
• Preliminary site layouts being development by consultant. • Project update to PRBC on November 4, 2022

Chapman House Shoreline
• Consultant is working on the study to update the 2013 shoreline stabilization recommendations report.

Price Historical House
• Friends of Price House has provided update preliminary event green layout for review by Planning Division and the PRBC.

St Jude’s Tunnel
• Decorative fence installation is complete.

Bello and Price Canyon Signal
• Topo survey, utility as-builts and traffic study being assembled.

Central Coast Blue
• JPA agreement approved by Council on October 4, 2022.

Bello Bridge
• Public Art – Installation of public art delayed based on supply chain issues.

Bello Bridge Trail Continuation
• Staff has received two quotes for construction of trail continuation, seeking third quote and discussions of potentially completing with in house staff. • Likely not entering into construction until Spring of 2023 based on Waterboard and California Department of Fish and Wildlife Permits.

Ocean Blvd Improvements
• Work continuing with construction of the bluff stabilization and new storm drain, and

9.B-30Council Agenda 11-15-2022
Attachment 7
Packet Page 43

curb, gutter and sidewalk.
• Anticipated completion July 2023, winter weather pending.

Corp Yard Remodel/Addition and City Hall Improvements
• City Hall
o Work on upstairs file room modification complete.
o Quote received from Paso Robles Glass for two new glass entry doors for employee lounge and upstairs employee entrance, staff reviewing. o Front counter modification complete.
o Finance department modification complete.
• Corp Yard
o IT installing server racks and apparatus.
o Final fire alarm testing.
o Final inspection for Building Department based on final fire alarm testing. o Working on final punch list items from Building Department, staff can occupy.

Paving Project
• Construction of new sidewalk and ADA curb ramps at intersection of Ventana and James Way.
• Concrete work on Solar way complete.
• Construction of concrete work in progress on Mattie Road. • Repaving of Bluff trail beginning week of October 24, 2022.

Chapman Estate ADA Bathroom
• Final plans received from Puglisi Architects for ADA bathroom. • Staff beginning to put together bid package for advertisement estimated in November 2022.

Chapman Estate Windows
• Received $100k quote from Pella Windows for all windows in house (material). • Staff and Hunter Smith Architecture has met with Paso Robles Glass (Milgard and Andersen suppliers) at the estate to view existing windows. • Staff has reached out to Andersen Windows and is organizing meeting at estate to also view windows.

Chapman Estate Interior Repairs
• Staff has met with Chapman Estate Foundation to view areas of needed plaster repair, parquet floor replacement and painting of interior of house.

James Way Beautification Project
• Structural Engineer has assessed the existing wall that abuts the sidewalk and the tracts. Staff is waiting for an official memo from the Structural Engineer. • Staff is waiting on 60% plans to be submitted.

Ventana Tennis Courts Project
• Consultant has submitted 90% plan for staff review.

9.B-31Council Agenda 11-15-2022
Attachment 7
Packet Page 44

PUBLIC WORKS OPERATIONS
Utilities Division
• Continue annual storm drain cleaning and trash assessment.

Public Facilities Division
• Red curb painting.
• 300 Main PD demo and construction prep.
• Normal operations.

ENGINEERING ACTIVITIES
Development Review/Permits
• 2655 Shell Beach Road – Mixed Use Senior Affordable Housing Units – HASLO – Final PIP approved. Construction of sidewalk on Seacliff anticipated to begin October 21st, 2022. Anticipate 3 weeks of construction.
• 478 Hinds – Parcel Map – Map approved by Council on October 4, 2022. • Hanford/Shaffer Lane Development – Contractor has begun traffic control and potholing to locate existing utilities and define new utility alignment along project development frontage.

Stormwater State Board Permit Compliance
• MS4 Annual report submitted on October 14, 2022.
• Trash Assessments – Full capture equivalency.
• Structural Stormwater Device Certifications.
• Mapping through 2nd Nature Software – Pollutant load modelling.

OTHER ACTIVITIES

During the month of October project development review, staff performed 17 plan checks.

Engineering staff issued 6 encroachment permits, 1 transportation permit, and performed 24 field inspections during the month.

9.B-32Council Agenda 11-15-2022
Attachment 7
Packet Page 45

March: N/A
YTD: N/A

VIC Walk-In Count: N/A
Daily Average: N/A

International visitors:

N/A

Inquiries/Comments
N/A

• Sent Visitors Guides to Virginia, Florida, Ohio, Pennsylvania, Virginia, North Carolina, Florida, Ohio, Illinois, Missouri, Texas, Colorado, Utah, Nevada and California. • Received Leads from Visit California and added respondents to our newsletter. • Received payment, insurance, health permits, business licenses from vendors for Clam Festival. • Coordinated with SLO County Health Agency for inspection of vendors at Clam Festival. • Sent photos of the Pismo Preserve and Dinosaur Caves Park to Visit SLO CAL. • Sent photos and press release of the Airstream Visitor Center to CCTC. • Scheduled holiday clam paintings for VIC and PCV. • Sent event information on Clam Festival to student for CSU Monterey Hospitality Event project. • Finalized all remaining invoices and balances for Clam Festival. • Finalized last minute details with McLintocks on beer garden and cook-off details. • Processed Check Requests for Flannel 101, Molly Ringwald Project and Resination. • Created signs for A-frame sign holders, table top sign holders and programs for Clam Festival and parade. • Created banners for City Council on the fire truck for the Clam Festival Parade and parade programs. • Sent out information to parade participants for placement in the parade. • Reached out to find Parade and Clam Chowder Cook-Off judges. • Submitted a lead to local lodging properties for PARMA event for October 2023. • Scheduled CVB/LBID Board Sub-Committee logo meeting. • CVB/LBID Board Meeting agenda prep. • Continued to receive Marching Band Review entries. • Corrected domain information through our website host. • Ordered trophies for Band Review. • Reached out to California Fresh to secure judges lunch for Band Review. • Verified domain name registration for classiccalifornia.com • Custom canopy for MSD came in this week. • Reached out to California Conservation Corps for Band Review event volunteers. • Processed Band Review payments for Epic Entertainment and SYV Elite Rentals. • Shared local school band information with Ampsurf for their ISA event. • Sent out Band Review schedules, rules and parade route information to Band Leaders. • Finalized judges rooms, route, schedule and rules with Head Judge. • Processed payments for judges and finalized hotel rooms and tabulation room for Band Review. • Reached out to California Conservation Corps, Pismo Chamber, Casa Solana, AGHS and other for volun- teers for Band Review. • Contacted parade entries who won awards to notify them of how to get their awards.

Visitors Information Center and Airstream Highlights • Reorganized and cleaned up the brochures at the VIC. • Worked with VIC host to get more brochures or-
dered. • Spent time training and answering questions with new hire at VIC. • Worked with staff to delegate duties for Clam Fes- tival. • Saw a lot of whale activity off the pier which brought more visitors to the airstream. • Clam Festival clean up and organizing. • Distributed flyers for downtown businesses and residents to notify them of road closures for Band
Review. • Delivered gift boxes to volunteers who wore clam costumes in the Clam Festival Parade.

Chapman Estate Highlights
• Processed Check Request for Docent Tour Fees to
Chapman Estate Foundation for September and
October. • Wedding and Reception held at the Estate. • Scheduled tentative date for CAPSLO Afternoon of Epicurean Delights for 2023. • Sent updated Visitor Log from September/ October to Chapman Estate Foundation. • Attended Chapman Luncheon with Foundation to discuss success from recent Swingin by the Sea
event. • Going into final week of Open Gates, the luxury portable restrooms are being removed end of
month. • Chapman Estate Foundation Licensing Agreement
Meeting.

9.B-33Council Agenda 11-15-2022
Attachment 8
Packet Page 46

PLATFORM TOTAL FANS/
VIEWS

NEW THIS
MO.

Facebook 204,719 0
Twitter 6,206 -3
Instagram 69,238 427
YouTube 642,956 250
E-Newsletter 48,370

ExperiencePismoBeach.com THIS MONTH YEAR TO DATE
Total Sessions 72,740 298,968
Average Daily Visitors 2,346 2,430
All Lodging Referrals 3,857 21,363
Jack Rabbit
Referrals
1,429 9,987
• Agenda Review Meeting • Department Head Meeting • Cal Travel Summit in Palm Springs • South Coast Chamber Installation Dinner • ISA World Para Surfing Championships LOC Meeting • SCCC Meeting • CLIA Meeting • Friends of Price House Meeting • Quarterly Safety Meeting • SLO CAL Strategy Workshop • SLO Wine Collective Planning Meeting • City Council Meeting • Pismo Chamber Board Meeting • South County Chamber Meeting • SEC Meeting • California Luxury Forum • Chapman Estate Licensing Agreement Meeting • Citig Sharepoint Meeting • Cuz We’re Pismo • https://keyt.com/news/san -luis-obispo-
county/2022/09/29/pismo-beach-welcomes-longboard
-competition/
• https://www.theinertia.com/surf/kai-sallas-and-sophia -culhane-win-the-surfing-for-hope-longboard-classic-in
-pismo-beach/
• https://moneyinc.com/cheapest-but-best-beach-
vacations-in-the-u-s/
• https://www.yahoo.com/video/surfing-hope-
longboard-competition-underway-023303608.html
• https://www.tripadvisor.com/Articles-lCxQYv5e8HbE-
Pismo_beach_weekend_guide.html
• https://www.ksby.com/news/local-news/pismo-beach
-reminding-community-about-harvesting-rules-ahead-
of-clam-festival
• https://www.nbclosangeles.com/worth-the-trip/this-
pismo-beach-chowder-cook-off-will-soon-simmer-
succulently/3003043/
• https://www.sfchronicle.com/projects/travel/highway - 1-california-road-trip/cambria-to-santa-barbara
• https://www.carvemag.com/2022/10/team-england-
adaptive-para-surfers-announced-for-2022-isa-world-
para-surfing-championships/
• https://www.ksby.com/news/local-news/76th-annual-
pismo-beach-clam-festival-returns
• https://www.ksby.com/news/local-news/76th-annual-
pismo-beach-clam-festival-comes-to-an-end
• https://www.ksby.com/community/ampsurf-seeks-
volunteers-for-upcoming-operation-restoration-event-
in-pismo-beach
• https://www.920kvec.com/2022/10/17/76th-pismo-
beach-clam-festival/
• https://www.youtube.com/watch?v=UHvE6ol8LaM
• https://www.newtimesslo.com/sanluisobispo/clams-
disappeared-from-pismo-beach-because-of-sea-otters/
Content?oid=13038985
• https://www.yahoo.com/lifestyle/california-dreamin-
pismo-beach-170212777.html

• Received SEC permit applications for Holiday Stroll,
Turkey Trot and beach wedding. • Verified vendor business licenses for Art in the Park. • Sent updated 2022 and 2023 SEC calendars to SEC members. • Issued SEC permit for Scholastic Surf Series. • Notified SEC permit applicants of their approval status and outstanding pending items for permitting. • Had Pismo Chamber alcohol forms signed by PD and returned to the Chamber for ABC licensing for Clam
Festival Wine Walk. • Worked with Amsurf, PD and PW on parking for Oper- ation Restoration parking. • Processed PO for Surfing For Hope Sponsorship.

• https://www.youtube.com/watch?v=nIpsfBAHvzc
• https://www.ksby.com/news/local-news/veterans-
find-healing-through-the-ocean-at-the-17th-annual-
operation-restoration-event
• https://www.travelawaits.com/2817248/best-hotels-
pismo-beach-california/
• https://www.msn.com/en-us/travel/tripideas/the-14-
most-amazing-attractions-in-san-luis-obispo/ss-
AA13pAcC?li=BBnbklE#image=2
• https://santamariatimes.com/news/local/disabled-
veterans-find-healing-during-central-coast-ampsurf-
event/article_30517fe8-1bf1-5cdd-8f64-
5e54529f2870.html
• https://keyt.com/news/san-luis-obispo-
county/2022/10/20/ampsurfs-annual-event-for-
veterans-kicked-off-in-pismo-beach/ 9.B-34Council Agenda 11-15-2022 Attachment 8
Packet Page 47

RECREATION PROGRAMS
•Enrollment for fall programs continue for both youth and adult programs. •Fall adult programs for October; programming for both outdoor and indoor classes include Acrylic Art, Yoga, Dog Obedience, Tae Kwon Do, Qi Gong, watercolor, Judo and Latin/Ballroom Dance and a Low Impact Fitness class.
•Recreation registered 65 participants for recreation programs in October. •The free community pickleball clinic for October had over 15 participants. •Recreation continues to register participants over the phone to answer questions relating to upcoming clas- ses and programs. For our active adults, phone transactions and registrations are preferred. •Instructor payments/invoices/weekly cash reconciliation completed as scheduled. •Flyers for upcoming classes and camps were created and translated, with flyers uploaded onto Peachjar to promote these activities (school district promotional distribution service).

ACTIVITY GUIDE
•Planning for the Winter/Spring 2023 activity guide is in full swing. This edition is due for distribution in the first week of December and staff are actively working with instructors and programs to offer the highest quali- ty programs for our seniors, adults, and youth. Our guide includes special events, camps, classes, trainings, and even travel opportunities!

SPECIAL EVENTS
•Recreation held the Senior Dance on October 3rd, with approximately 20 in attendance. This month’s theme was “Halloween Costume Party”. Staff provided a meal which included chili and a baked potato bar. Music was again provided by the Swingin’ Bridge Band.
•Fall into Fun, a neighborhood event on October 7th, was well attended. With about 150 in attendance, fami- lies and neighbors enjoyed music, refreshments, and activities for all ages. Members of City council and other city departments were in attendance to welcome our neighbors. Our next neighborhood event will be on No- vember 4th at Boosinger Park.
•This year’s Pumpkins in the Park was as successful as ever. Preparation for this event beginnings in late Au- gust, preparing marketing and sponsorship material for local businesses. Staff mailed (letters and emails) local businesses and followed up with phone calls for participation in the Downtown trick-or-treating events as well as, visiting businesses in person for donations for costume contest winners. Over 50 downtown business par- ticipated in the trick-or-treating events, and 30 donating the Pumpkins Event at Dinosaur Caves Park. Great weather and over 80 volunteers helped make this a smooth event. Over 2000 people enjoyed games, a pump- kin patch, bounce houses, and a costume contest. One of recreations divisions premier events, we were very happy to see a great turnout and support from our local community. •Planning for Holiday Harmony has begun. This annual event and tree-lighting ceremony will take place at the Pismo Beach Pier and promenade on December 2nd. This event will feature snow, crafts, cookie decorating, bounce houses, and holiday goodie bags from Santa himself. Snow on the pier will also return this year!

9.B-35Council Agenda 11-15-2022
Attachment 8
Packet Page 48

RECREATION DIVISION HIGHLIGHTS CONT.

FACILITIES
•The Facility Coordinator position has been vacant since mid-August. Interviews to fill staff positions will hap- pen in November. Recreation staff is currently filling in by taking in all park/hall reservations and review- ing current rentals on the books.
•Requests for rentals have been steadily increasing heading into the fall. •13 Park rental applications and 5 hall reservations were booked for the month of October, including an 8-day convention at the Pismo Beach Veterans Hall.
•Staff completed the third quarter insurance report for the months of July-September for Alliant. •The Facility Attendant, Security Guard, and Janitorial service schedule is constantly updated to reflect new rentals. Recreation also is working with a new security provider to fulfill the needs of our increase in facili- ty rental requests.
•Recreation communicated with special events regarding park application, fees, and rental details. Recreation sent the Janitorial service the monthly calendar for programs and cleaning schedule. •Adopt-a-bench inquires continue with currently the only benches along Shell Beach Road Streetscape and pier picnic tables available for adoption. Recreation staff are developing a plan and schedule to strategi- cally replace worn benches in need of replacement. One new plaque has been installed with three cur- rently in process.
•The Wadsworth volleyball courts had 1 rental for the month of October.

PUBLIC ART PROJECTS l PRBC
•The Bello Street Bridge project is still on hold due to a printing of one last panel. Expected delivery for this panel is mid-November with completion of project being completed in December. •Recreation continues to work with Engineering regarding the upcoming playground projects for Chumash/ Palisades Park. A report will be presented at the next PRBC meeting scheduled for November 3rd.

• Recreation Manager met with PRBC Chair for update on current projects/agenda.

ADMINISTRATIVE
•Instructor payments and cash reconciliation were completed on a weekly basis. •Follow-up with instructors on enrollment and logistics for upcoming classes. •Invoices, contracts processed.
•Inquiries regarding recreational programs.
•Recreation Manager attended the monthly SEC meeting.
•Staff attended the CPRS District 8 Fall Forum in Solvang on October 14. The general theme from all the speakers was “wellness” both in the workplace and for the public. Recreation staff from Ventura, Santa Barba- ra, San Luis Obispo, Monterey counties, and Bakersfield attended the forum to share their experience and ex- pertise with neighboring municipalities.

9.B-36Council Agenda 11-15-2022
Attachment 8
Packet Page 49

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.D

SUBJECT/TITLE:

UPDATE ON MARCH 16, 2020 AND JANUARY 12, 2017 EMERGENCY

PROCLAMATIONS

RECOMMENDATION:

No action required; information only.

BACKGROUND:

Chapter 2.32 of the Pismo Beach Municipal Code empowers the City Manager, acting as the Director of Emergency Services, to proclaim the existence of a local emergency when the City is affected by an emergency and the City Council is not in session. An emergency exists when conditions are beyond the control of the services, personnel, equipment, facilities, and existing laws of this City. The declaration is an acknowledgement of the need for additional resources and expedited procedures to deal with the emergency. The Director of Emergency Service’s declaration is subject to City Council ratification within seven days.

As required by the Emergency Declarations ratified by Resolution R-2020-026 on March 17, 2020, relating to the COVID-19 health threat, and by Resolution R-2017-012 on January 17, 2017, relating to winter storm damage, the following status report is provided for information purposes.

March 17, 2020 Proclamation: COVID-19
A severe acute respiratory illness caused by a novel (new) coronavirus, known as COVID- 19, has spread globally and rapidly, resulting in illness and death around the world. The World Health Organization has described COVID-19 as a global pandemic. On March 4, 2020, California Governor Gavin Newsom declared a State of Emergency in response to the increased spread of COVID-19. Additionally, on March 13, 2020, the County of San Luis Obispo declared a countywide emergency. And on March 13, 2020, the President of the United States declared a federal emergency as a result of COVID-19.

The City Manager, acting as the Director of Emergency Services, proclaimed the existence of a local emergency on March 16, 2020, which declaration was ratified by Council Resolution R-2020-0261 on March 17, 2020. The Council further proclaimed that a local emergency existed as of the date of the Governor’s March 4, 2020 declaration of emergency, and that the local emergency continued to exist. The City also partially activated its Emergency Operations Center on March 16, 2020 and the EOC team has met periodically to address the changing conditions presented by the various emergency declarations and other state and county health guidance.

1 Full URL:
https://accesspismo.pismobeach.org/WebLink/DocView.aspx?id=250354&dbid=0&repo=Laserfiche

9.D-1Council Agenda 11-15-2022
Packet Page 50

Actions taken to date with respect to COVID-19 response have included the continued procurement of sanitation supplies, the temporary closure of City Hall and other City facilities to the public, additional software licensing to increase public access to the City’s online records, and the development of virtual meeting models to allow the City Council, staff, the business community, and residents to participate remotely in critical meetings.

The City ordered Pismo Beach-branded bandanas to be used as face coverings, and provided them to lodging properties and other businesses for distribution to customers.

As a result of seasonal crowds, staff ordered and posted signage promoting keeping physical distance. The City has allowed the use of the right-of-way for queuing of customers, and developed a pilot Temporary Outdoor Dining Area Certification (TODAC) program allowing businesses to place tables for their customers in approved outdoor areas such as parking lots. The City Council has also authorized the use of certain street rights-of-way for temporary outdoor dining as part of the City’s COVID-19 Support Dining Encroachment Permit program, which is still in effect.

During the initial closure of City facilities, the City adopted work-from-home policies and procedures to allow “essential” staff to continue their work and offer many public services virtually. At a special meeting of the City Council held on December 11, 2020, the Council authorized the Mayor to support a regional initiative for the counties of San Luis Obispo, Santa Barbara, and Ventura to be considered separately from the “Southern California” region for purposes of state COVID-19 metrics that dictate which counties are able to “re- open,” as the rates of infection and ICU occupation remain much lower in the tri-county area than the remainder of the counties currently considered to be part of the “Southern California” region. A joint Mayors’ letter asking for the state’s consideration of this request was transmitted the week of December 14, 2020. At this same meeting, the Council affirmed its support for this City’s continued enforcement of what were then known as state “purple tier” health and safety restrictions.

On May 19, 2020, the Council adopted Urgency Ordinance O-2020-004 which implemented a requirement that employees of any business open to the public wear face coverings when unable to maintain adequate physical distance from customers, as well as a requirement that each such business post signage encouraging patrons to wear masks, and providing information about CDC recommendations relating to hand washing and other topics. This Ordinance became effective on May 20, 2020. Staff delivered direct messaging to the business community using contact information provided in business licensing records. On June 15, 2021, following the relaxing of state health directives relating to the virus, the City Council adopted Urgency Ordinance O-2021-002 which repealed the City’s local face covering mandates.

The City provided messaging to the community encouraging the public to pursue vaccination, and has ensured that City Council Members and staff members are enrolled in vaccination opportunities as appropriate. On April 27, 2021, it was announced that San Luis Obispo County would be moved to what was then known as the state’s “orange” tier of state-mandated health and safety restrictions, effective April 28, 2021, enabling the transition to certain activities, such as limited indoor gatherings of individuals, with certain restrictions. As such, staff implemented a hybrid model for City Council and Planning

9.D-2Council Agenda 11-15-2022
Packet Page 51

Commission meetings, where a majority of legislative body members and some staff are present in person, and some legislative body members, some staff, and all members of the public are present virtually.

In late May of 2021, the State of California announced the planned repeal of most temporary health and safety restrictions relating to COVID-19 on June 15, 2021. In anticipation of a grace period allowing local jurisdictions to return to pre-pandemic practices shortly after the emergency orders were lifted, staff prepared logistically for the full return of the public in-person access to City Hall, other City facilities, and City Council Meetings. At the time of the update presented on August 17, 2021, nearly all City staff had returned to the office full-time, and CalOSHA guidance relating to the use of face coverings in the workplace had been implemented.

As of late 2021, City was monitoring concerns relating to the delta variant of the coronavirus, and the full return to in-person legislative meetings had yet to be implemented. In accordance with face covering guidance issued by the County Health Officer effective September 1, 2021, the City had issued a directive requiring employees to return to the use of face masks indoors and in vehicles when in proximity to other employees, as well as requiring visitors to wear masks inside City facilities.

The California Governor ended the state’s indoor mask mandate for vaccinated people on February 15, 2022, and at that point, vaccinated employees and officials were no longer required to wear face coverings inside City work facilities. A hybrid in-person/virtual legislative meeting model was implemented for meetings of the City Council and advisory bodies, with legislative body members, staff, and the public participating both in the Council Chamber and virtually.

Due to a relatively high number of COVID-19 cases at City Hall in late May and early June 2022, a number of staff resumed work-from-home practices on a temporary basis, and in addition to following standard CalOSHA guidance, enhanced guidance for masking upon returning to the office was implemented. Legislative meetings in the first half of June were held entirely virtually, and have since returned to fully in-person, with a virtual access option. Staff is monitoring state and county regulatory changes, including Assembly Bill 2449, which will become effective January 1, 2023, and affect logistics relating to the implementation of the teleconferencing under the Brown Act for legislative meetings.

January 17, 2017 Proclamation: Winter Storms
Summary of Current Events
The storm drain failure at Cliff Avenue and Ocean Boulevard required a Phase II Environmental Study per Caltrans Local Assistance (LA) and the City’s environmental subconsultant. The Phase II Environmental Study fieldwork is complete and National Environmental Policy Act (NEPA) clearance has been provided. Staff submitted a time extension request to Caltrans LA in mid-August 2022, and is waiting on approval of that request. Staff has also submitted a request for authorization for the Right of Way (RW) phase of this project and is awaiting Caltrans review and approval before moving forward.

9.D-3Council Agenda 11-15-2022
Packet Page 52

Contracts were awarded by Council on December 21, 2021 to Granite Construction, Inc. (Granite) and Cannon Associates (Cannon) for construction and construction management services for the Ocean Boulevard Improvement Project, respectively. A pre- construction meeting for the project was held the week of February 7, 2022 and construction is ongoing. The project is anticipated to be complete in early Summer 2023.

Staff executed a contract with Eikhof Design Group, Inc., which has prepared 100% engineering plans for inhouse review and comments. The consultant is also preparing a bid document package and technical specifications. Staff anticipates requesting Council approval for authorization to advertise for construction bids in late October 2022.

Summary of Past Events
The Pismo Beach City Council declared a state of emergency on January 12, 2017, via Resolution R-2017-0122, in response to the January 2017 winter storms. Shortly after the Council’s declaration, the County of San Luis Obispo declared an emergency which was followed by a declaration by Governor Jerry Brown for the region. On February 14, 2020 and March 16, 2020 President Donald Trump declared a major disaster for the early and late January storms, making federal disaster aid available. The storms, which began the first week of January, took a toll on the community, culminating with a Caltrans storm drain failure on Highway 101, which caused flooding of two hotels on Price Street, blockage of the City’s Franklin storm drain outfall and debris scattered along Highway 101, Price Street and sidewalk, on Franklin Drive and various private parcels on January 20, 2017. Damage from the storms includes but is not limited to the following:
 Bluff failure on Ocean Boulevard (Caltrans purview)
 Bluff failure at Memory Park (FEMA purview)
 Franklin Avenue storm drain failure (FEMA purview)
 City Hall storm damage (FEMA purview)
 Bluff failure at Ebb Tide Park (FEMA purview)
 Bluff failure at Cypress Street at Harloe Avenue (FEMA purview)  Storm drain failure on the City’s outfall located adjacent to the Dolphin Bay Resort (FEMA purview)
 Storm drain failure on Cliff Avenue at Ocean Boulevard (adjacent to Dinosaur Caves Park) (Caltrans Purview)
 Storm drain failure at the end of Harbor View Avenue (FEMA purview)  Slope/road failure on Price Canyon Road (Caltrans purview)

Staff took immediate cleanup and protective measures of the sites where possible and has been working with FEMA through the California Governor's Office of Emergency Services (CalOES) and FHWA through Caltrans for reimbursement for work and funds required to cleanup and secure the various sites. Staff attended a Recovery Scoping Meeting with FEMA on May 16, 2017 and a Damage Assessment Site Inspection Meeting with Caltrans on May 18, 2017. The application and approval process for cost recovery

2 Full URL:
https://accesspismo.pismobeach.org/WebLink/DocView.aspx?id=107586&dbid=0&repo=Laserfiche

9.D-4Council Agenda 11-15-2022
Packet Page 53

and permanent restoration at each site under FEMA purview is complete and checks have been issued based on FEMA scoping and estimated construction costs with a reimbursement of 93.75% FEMA/State and a 6.25% City match. Completed work for sites under FEMA purview includes removal of the fallen tree on the beach below Ebb Tide Park. It was anticipated that the actual cost of repairs at each site will exceed the amount approved and checks issued by FEMA. The City also filed insurance claims for each of these sites to potentially assist in completion of the repairs. After FEMA review, the following sites are deemed ineligible for federal aid as observed erosion and bluff failure was defined by FEMA representatives as naturally occurring over time:

 Bluff failure at Memory Park
 Bluff failure at Cypress Street at Harloe Avenue

Permanent restoration at these two sites will have to rely solely on insurance claim funding and/or grants that City staff is consistently in search of and pursuing.

The City has received all reimbursement checks from the State and Federal Emergency Management Agency (FEMA) for damages at various sites under FEMA purview during the 2017 storms totaling $101,833. The next step is for City staff to further evaluate each site, issue requests for proposals (RFPs) for engineering design and environmental services and/or pursue cost estimates from contractors for permanent restoration of these sites which include:

 Franklin Avenue storm drain failure (FEMA purview)
 City Hall storm damage (FEMA purview)
 Bluff failure at Ebb Tide Park (FEMA purview)
 Storm drain failure on the City’s outfall located adjacent to the Dolphin Bay Resort (FEMA purview)
 Storm drain failure at the end of Harbor View Avenue (FEMA purview)

Construction of repairs and drainage improvements to address leaking issues at the Fire Administration and Conference and Visitors portion of City Hall is complete.

The City received authorization from the Federal Highway Administration (FHWA) through the California Department of Transportation (Caltrans) for engineering design and environmental studies for the following three sites:

 Bluff failure on Ocean Boulevard
 Storm drain failure on Cliff Avenue at Ocean Boulevard (adjacent to Dinosaur Caves Park)
 Slope/road failure on Price Canyon Road

Costs for these services are reimbursed at 88.53% by FHWA/Caltrans with an 11.47% City match. The environmental/design phase for both the Ocean Boulevard Improvement Project and the Price Canyon Road Slope Repair Project began by TerraCosta Consulting Group and Yeh and Associates, Inc., respectively in early 2019. Environmental, cultural

9.D-5Council Agenda 11-15-2022
Packet Page 54

resource and temporary access impacted the design schedule and City staff pursued one- year time extensions from Caltrans for each project which we were subsequently granted.

Construction for the Price Canyon Road Slope Repair project is complete along with the 3-month plant establishment period. A Notice of Completion was approved by the City Council on May 17, 2022.

The City has included the permanent repair of all sites (both Caltrans and FEMA purview) damaged during the January 2017 storms in an insurance claim and has provided all required documentation to the insurance company. City staff was presented with a Partial Proof of Loss and Subrogation Agreement for the Morro stairs and storm drain outfall sites during a meeting with our insurance representative on February 15, 2019, and the City has received an initial payment in the amount of $504,324. This amount is based on the estimated cost of repair for the Morro Stairs and outfall. The City is currently waiting on a response from the City’s insurance representative on an initial payment amount that could be expected for all other sites. The City’s insurance representative has also indicated that the cost of engineering and environmental services for each site can be added to the total amount of the claim.

Staff is also pursuing a grant from the California Governor’s Office of Emergency Services (CalOES), through the Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program (HMGP) as well as the Building Resilient Infrastructure and Communities (BRIC) program for stabilization of a portion of the bluff near the City’s lift station at the end of Harloe Street. The City submitted a full HMGP subapplication to CalOES on April 8, 2022. CalOES is expected to select projects for further review by FEMA in late summer/early fall 2022. The City also submitted a Notice of Interest (NOI) to CaloOES for the BRIC program on September 16, 2022. Staff expects to receive notification within 30 days on the BRIC NOI, and will submit a full subapplication if the NOI is approved.

FISCAL IMPACT:

There is no direct fiscal impact from this report.

COVID-19
Costs related to the COVID-19 emergency are continuing on an ongoing basis, and as such, a precise total is difficult to assess at the current time. Staff will continually update Council as appropriate on anticipated future costs and reduced revenues as a result of the emergency.

January 2017 Winter Storms
The cost of damage from the January 2017 storms is estimated to be between $3,000,000 and $6,000,000. Once the damage can be fully assessed, staff will be able to formulate a better cost estimate.

ALTERNATIVES:

None, for information only.

9.D-6Council Agenda 11-15-2022
Packet Page 55

ATTACHMENTS:

None.

Prepared by: Meeting Date: November 15, 2022
Chad Stoehr, P.E., Engineer
Erica Inderlied, City Clerk
Submitted by: Erica Inderlied, City Clerk
City Manager Approval:

9.D-7Council Agenda 11-15-2022
Packet Page 56

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.E

SUBJECT/TITLE:

ACCEPTANCE OF GRANT FUNDS ALLOCATED BY THE OFFICE OF TRAFFIC

SAFETY (OTS) AND AUTHORIZATION OF PURCHASE OF ONE EXTRICATION

SYSTEM AND AIRBAGS FROM LN CURTIS

RECOMMENDATION:

Adopt a Resolution authorizing the acceptance of grant funds in the amount of $46,000 from the Office of Traffic Safety, and the purchase of an extrication system and airbags from LN Curtis, and appropriating related budget adjustments in Fiscal Year 2023.

BACKGROUND:

In January of 2022, staff applied for a “Regional Collision Response and Extrication Improvement Program” grant through the California Office of Traffic Safety (OTS) in the amount of $46,000. Staff was able to show that the equipment that is on the City’s Rescue Vehicle 64 is old and older tools either do not have enough power to cut or manipulate metal in the new vehicles, or cost more to repair than to replace. Rescue 64 is a first-out response vehicle, and having the new extrication equipment is essential. The new tools meet industry standard with a stronger and longer-lasting battery. The City purchased new extrication equipment for Engine 64, Engine 63, and Engine 264 with funds from an OTS grant received in 2018.

Staff was notified in October that the City had been awarded the grant in the amount of $46,000 to be used to purchase an extrication system and airbags for the City of Pismo Beach Rescue Vehicle. A quotation for the purchase of the extrication equipment and airbags from LN Curtis is provided as Attachment 1.A.

Conclusion and Recommendation
Staff recommends that the Council adopt a Resolution (Attachment 1) authorizing the acceptance of grant funds in the amount of $46,000 from the Office of Traffic Safety, the purchase of an extrication system and airbags from LN Curtis, and the appropriation of related budget adjustments in Fiscal Year (FY) 2023.

FISCAL IMPACT:

The fiscal impact of approving the attached Resolution is an increase of $47,175.28 in expenditures in the Motor Vehicle Replacement Fund offset by $46,000 of OTS grant revenues and $1,176.00 from General Fund Fire Department operating supplies and maintenance account. There is currently no budget available for the lift and extrication equipment.

Staff recommends that Council appropriate $46,000 in State government grant revenues in the Motor Vehicle Replacement Fund and $47,176 of expenditures in the in the Motor Vehicle Replacement Fund budget, Motor Vehicle Replacement activity, and capital outlay for machine and equipment. In addition, staff recommends that Council

9.E-1Council Agenda 11-15-2022
Packet Page 57

deappropriate $1,176 in the General Fund Fire Department operating supplies and maintenance account, appropriate a transfer of those funds to the Motor Vehicle Replacement Fund to support the Extrication System and Airbags in FY 2023, and appropriate any related transfers between funds.

FY 2022-23 Proposed Appropriations
Sources
Motor Vehicle Replacement Fund OTS Grant Revenues $46,000 General Fund Fire Department operating supplies & maintenance account 1,176 Total Sources $47,176
Uses
Motor Vehicle Replacement Fund Capital Equipment $47,176 Net Fiscal Impact $0
ALTERNATIVES:

1. Decline to adopt the resolution; reject the grant award.

2. Provide direction to staff.

ATTACHMENTS:

1. Resolution

1.A. Exhibit A to Resolution: Quotes from LN Curtis
Prepared by: Meeting Date: November 15, 2022
Michelle Pearson, Administrative Assistant
Submitted by: Paul Lee, Battalion Chief
City Manager Approval:

9.E-2Council Agenda 11-15-2022
Packet Page 58

RESOLUTION NO. R-2022-XXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PISMO BEACH,

CALIFORNIA AUTHORIZING THE ACCEPTANCE OF GRANT FUNDS IN THE AMOUNT OF $46,000 FROM THE OFFICE OF TRAFFIC SAFETY, AND THE

PURCHASE OF AN EXTRICATION SYSTEM AND AIRBAGS FROM LN CURTIS, AND APPROPRIATING RELATED BUDGET ADJUSTMENTS IN FISCAL YEAR 2023 WHEREAS, the City was successful in its application for a California Office of Traffic Safety grant which will be used to purchase an Fire Department Extrication System; and WHEREAS, the equipment currently on the City's Rescue 64 Emergency Vehicle is outdated, does not meet industry standards, and is completely out of service; the new equipment will meet industry standard and can be used regionally as this modern equipment is on all of the County Fire Engines; and
WHEREAS, the new Hurst Extrication System will be placed on City of Pismo Beach apparatus and provide potential life-saving measures to residents of and visitors ti Pismo Beach; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pismo Beach hereby accepts the grant funds of $46,000 from the California Office of Traffic Safety and authorizes the purchase an Extrication System and Airbags from L.N. Curtis in the amount of $47,175.28 (quotation provided as Exhibit A).

BE IT FURTHER RESOLVED that the City Council of the City of Pismo Beach hereby appropriates $46,000 in State government grant revenues in the Motor Vehicle Replacement Fund and $47,176 of expenditures in the Motor Vehicle Replacement Fund budget, Motor Vehicle Replacement activity, and capital outlay for machine and equipment.

BE IT FINALLY RESOLVED that the City Council of the City of Pismo Beach hereby deappropriates $1,176 in the General Fund Fire Department operating supplies and maintenance account and appropriates a transfer of those funds to the Motor Vehicle Replacement Fund to support the Extrication System and Airbags in FY 2023, including appropriating any related transfers between funds.

UPON MOTION OF Council Member , seconded by Council Member , the foregoing resolution was adopted by the City Council of the City of Pismo Beach this 15th day of November 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

9.E-3Council Agenda 11-15-2022
Attachment 1
Packet Page 59

RECUSED:

Approved: Attest:
________________________ ________________________
Ed Waage, Mayor Erica Inderlied, City Clerk

9.E-4Council Agenda 11-15-2022
Attachment 1
Packet Page 60

Ph: 510-839-5111
TF: 800-443-3556
Fax: 510-839-5325
[email protected]
UEI#: DDLSADSWN7U7
Pacific North Division
6723 Sierra Court, Suite C
Dublin, CA 94568
www.LNCurtis.com
Quotation No. 240978

Page 1 of 2 ends

Quotation
CUSTOMER:SHIP TO:

Pismo Beach City Fire
Department
760 Mattie Road
Pismo Beach CA 93449
Pismo Beach City Fire
Department
760 Mattie Road
Pismo Beach CA 93449
QUOTATION NO.ISSUED DATE EXPIRATION DATE
240978 10/20/2022 11/19/2022

SALESPERSON CUSTOMER SERVICE REP
Randy Royal
[email protected]
831-535-9541
Randy Royal
[email protected]
831-535-9541
REQUISITION NO.REQUESTING PARTY CUSTOMER NO.TERMS OFFER CLASS Robert Gorman C35311 Net 30 FR
F.O.B.SHIP VIA DELIVERY REQ. BY
FTSP Standard Shipping

NOTES & DISCLAIMERS
Thank you for this opportunity to quote. We are pleased to offer requested items below. If you have any questions, need additional information, or would like to place an order, please contact your Customer Service Rep as noted above.

Safety Warning Notice: Products offered, sold, or invoiced herewith may have an applicable Safety Data Sheet (SDS) as prepared by the manufacturer of the product. Any handlers or users of product should refer to applicable SDS prior to handling or utilizing the product. Applicable SDS are included with shipment of products. For other important product notices and warnings, or to request an SDS, please contact Curtis or visit https://www.lncurtis.com/product-notices-warnings

LN QTY UNIT PART NUMBER DESCRIPTION UNIT PRICE TOTAL PRICE 1 1 22889050G2 PARA
PKG
MODEL 50 81.2 TON- 5 LIFT BAG SET,
CONSISTING OF THE BELOW 4 LINE
ITEMS:
$5,079.75 $5,079.75
2 1 22-888140G2 PARA KPI12 13.7 Ton Maxiforce Air Lifting Bag 3 2 22-888150G2 PARA KPI17 19 Ton Maxiforce Air Lifting Bag 4 2 22-888160G2 PARA KPI22 25.6 Ton Maxiforce Air Lifting Bag

9.E-5Council Agenda 11-15-2022
Attachment 1.A
Packet Page 61

Ph: 510-839-5111
TF: 800-443-3556
Fax: 510-839-5325
[email protected]
UEI#: DDLSADSWN7U7
Pacific North Division
6723 Sierra Court, Suite C
Dublin, CA 94568
www.LNCurtis.com
Quotation No. 240978

Page 2 of 2 ends

LN QTY UNIT PART NUMBER DESCRIPTION UNIT PRICE TOTAL PRICE 5 1 22-890800 PARA Operations Manual for Bag and Control Package
6 1 22889050G2 PARA
PKG

END PKG
Small Business
CAGE Code: 5E720
DUNS Number: 009224163
SIC Code: 5099
Federal Tax ID: 94-1214350
This pricing remains firm until 11/19/2022. Contact us for updated pricing after this date.

Due to market volatility and supply shortages, we recommend contacting your local L.N. Curtis and sons office prior to placing your order to confirm pricing and availability. This excludes our GSA Contract and other Fixed Price Contracts which are governed by contract-specific prices, terms, and conditions.

Subtotal $5,079.75
Estimated Tax Total $393.68
Transportation $150.00
Total $5,623.43
View Terms of Sale and Return Policy

9.E-6Council Agenda 11-15-2022
Attachment 1.A
Packet Page 62

Ph: 510-839-5111
TF: 800-443-3556
Fax: 510-839-5325
[email protected]
UEI#: DDLSADSWN7U7
Pacific North Division
6723 Sierra Court, Suite C
Dublin, CA 94568
www.LNCurtis.com
Quotation No. 239490

Page 1 of 2 ends

Quotation
CUSTOMER:SHIP TO:

Pismo Beach City Fire
Department
760 Mattie Road
Pismo Beach CA 93449
Pismo Beach City Fire
Department
760 Mattie Road
Pismo Beach CA 93449
QUOTATION NO.ISSUED DATE EXPIRATION DATE
239490 10/05/2022 11/30/2022

SALESPERSON CUSTOMER SERVICE REP
Randy Royal
[email protected]
831-535-9541
Randy Royal
[email protected]
831-535-9541
REQUISITION NO.REQUESTING PARTY CUSTOMER NO.TERMS OFFER CLASS Michelle Pearson C35311 Net 30 FR
F.O.B.SHIP VIA DELIVERY REQ. BY
DEST Standard Shipping

NOTES & DISCLAIMERS
Thank you for this opportunity to quote. We are pleased to offer requested items below. If you have any questions, need additional information, or would like to place an order, please contact your Customer Service Rep as noted above.

Safety Warning Notice: Products offered, sold, or invoiced herewith may have an applicable Safety Data Sheet (SDS) as prepared by the manufacturer of the product. Any handlers or users of product should refer to applicable SDS prior to handling or utilizing the product. Applicable SDS are included with shipment of products. For other important product notices and warnings, or to request an SDS, please contact Curtis or visit https://www.lncurtis.com/product-notices-warnings Transportation is included in below pricing.

LN QTY UNIT PART NUMBER DESCRIPTION UNIT PRICE TOTAL PRICE 1 1 EA 272889000-9
HURST
S789 E3 eDraulic Cutter 9Ah Package,
Includes:
- 1ea. S789 E3 Cutter
- 2ea. 9Ah Batteries
- 1ea. 110V Charger
Replace standard 9AH batteries for Item #
90-53-18 (Saltwater Battery)
$13,356.00 $13,356.00
2 1 EA 271855000-9
HURST
SP555 E3 eDraulic Spreader 9Ah Package,
Includes:
- 1ea. SP555E3 Spreader
- 2ea. 9Ah Batteries
- 1Ea. 110V Charger
Replace standard 9AH batteries for Item #
90-53-18 (Saltwater Battery)
$14,616.00 $14,616.00

9.E-7Council Agenda 11-15-2022
Attachment 1.A
Packet Page 63

Ph: 510-839-5111
TF: 800-443-3556
Fax: 510-839-5325
[email protected]
UEI#: DDLSADSWN7U7
Pacific North Division
6723 Sierra Court, Suite C
Dublin, CA 94568
www.LNCurtis.com
Quotation No. 239490

Page 2 of 2 ends

LN QTY UNIT PART NUMBER DESCRIPTION UNIT PRICE TOTAL PRICE 3 1 EA 274886000-9
HURST
R522 E3 Ram 9Ah Package, Includes:
- 1ea. R522 E3 Ram
- 2ea. 9Ah Batteries
- 1ea. 110V Charger
Replace standard 9AH batteries for Item #
90-53-18 (Saltwater Battery)
$10,591.20 $10,591.20
Small Business
CAGE Code: 5E720
DUNS Number: 009224163
SIC Code: 5099
Federal Tax ID: 94-1214350
This pricing remains firm until 11/30/2022. Contact us for updated pricing after this date.

Due to market volatility and supply shortages, we recommend contacting your local L.N. Curtis and sons office prior to placing your order to confirm pricing and availability. This excludes our GSA Contract and other Fixed Price Contracts which are governed by contract-specific prices, terms, and conditions.

Subtotal $38,563.20
Estimated Tax Total $2,988.65
Transportation $0.00
Total $41,551.85
View Terms of Sale and Return Policy

9.E-8Council Agenda 11-15-2022
Attachment 1.A
Packet Page 64

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.F
SUBJECT/TITLE:

TRAFFIC SAFETY COMMITTEE RECOMMENDATIONS TO CITY COUNCIL RECOMMENDATION:

1. Adopt a Resolution authorizing the installation of up to 3 pedestrian and bicycle symbolled signs, up to 3 “yield to pedestrians” signs, and up to 3 “bikes reduce speed” signs along the Shell Beach Road multi-use path;

2. Receive a report on the items considered at the most recent Traffic Safety Committee meeting.

BACKGROUND:

The Traffic Safety Committee (TSC) met on October 18, 2022, and the following summary outlines the results of this meeting. The Public Works Department will implement the Traffic Safety Committee recommendations, unless otherwise directed by the City Council.

Item 1 – Shell Beach Multi-Use Path Signage
The TSC reviewed a request from a resident to install pedestrian and bicycle signage along the multi-use path on Shell Beach Road.

TSC Recommendation:

The TSC heard from several community members who voiced various concerns, the primary concern was bicyclists and pedestrians conflicts on the multi-use path. The community members spoke on how they believe that signage or striping would give users a better sense of awareness and knowledge.

The Public Works Director/City Engineer discussed why a center line was not striped on the multi-use path when the path was installed. The City did not want to give users a false sense of security or narrow the path for users. By installing a stripe down the middle to divide pedestrians and bicyclists, the path would not allow families to walk together without encroaching onto the bike lane. The Public Works Director also noted that Shell Beach Road was intended for commuters on bicycles to use and is striped for bicycle usage. Unfortunately, commuters do not prefer this route due to the stop signs, and often opt for the multi-use path, which they are also allowed to use.

The committee discussed that all bicyclists have to obey vehicle laws. The issue with adding signage along the multi-use path is that there is not an enforceable speed limit. A yellow speed limit sign would need to be posted as a suggested speed limit. It was also noted that there is no difference between electric and standard bicycles in the Vehicle Code.

Council Agenda 11-15-2022Council Agenda 11-15-2022 9.F-1 Packet Page 65

A suggestion was made by the TSC to reach out to the San Luis Obispo Bicycle Coalition to encourage bicyclists to use Shell Beach Road or Mattie Road when commuting through the area.

A motion was made to install up to 3 pedestrian and bicycle symbolled signs (red diamond on Attachment 2), up to 3 “Yield to pedestrians” signs (green square on Attachment 2), and up to 3 “bikes reduce speed” signs (yellow circle on Attachment 2) and communicate to Bike Coalition to use Mattie Road or Shell Beach Road if commuting through the area.

Motion by Jim Lewis seconded by Jorge Garcia, to approve the TSC recommendation.

Passed: 6/0/1
Ayes: Jim Lewis, Jorge Garcia, Benjamin Fine, Matt Downing, Daniel Herlihy, Paul Lee
Noes: None

Absent: Dave Daguerre
Staff recommends that the City Council approve the TSC’s recommendation by adoption of a Resolution (Attachment 1). An exhibit is provided as Attachment 2.

Item 2 – Multi-Stop or Yield at Norma and Frances
The TSC discussed a request from a resident to install a multi-way stop or yield at the intersection of Norma Drive and Frances Way.

TSC Recommendation:

The TSC noted that there is a multi-way stop at the intersection on Elaine Way and Norma Drive; however, this intersection is different from the subject intersection because Elaine Way is a through street. The TSC did not have any collision reports for this intersection.

A motion was made to not take action at this time based on the fact that the intersection does not meet Federal Highway Administration Manual on Uniform Traffic Control Devices MUTCD warrants and there is no collision data to support a multi-way stop.

Motion by Benjamin Fine seconded by Matt Downing, to approve the TSC recommendation.

Passed: 6/0/1
Ayes: Jim Lewis, Jorge Garcia, Benjamin Fine, Matt Downing, Daniel Herlihy, Paul Lee
Noes: None

Absent: Dave Daguerre
No action is required by City Council. An exhibit is provided as Attachment 3.

Council Agenda 11-15-2022Council Agenda 11-15-2022 9.F-2 Packet Page 66

Item 3 – Baxter Lane Parking
The TSC discussed a request from a constituent to remove one side of no parking on Baxter Lane between Shafer Lane and the stub end.

TSC Recommendation:

The Fire Chief noted that originally this area was marked for no parking because response time for wildfires in that area is a concern. The Fire Department would be able to get fire engines into the area, but would not be able to get vehicles out and evacuate residents at the same time. The Fire Chief offered to work with the constituent to assign 3 parking passes with terms and conditions that would allow them to park in this area temporarily during construction.

A motion was made for the Fire Chief to handle this administratively.

Motion by Benjamin Fine seconded by Paul Lee, to approve the TSC recommendation.

Passed: 6/0/1
Ayes: Jim Lewis, Jorge Garcia, Benjamin Fine, Matt Downing, Daniel Herlihy, Paul Lee
Noes: None

Absent: Dave Daguerre
No action is required by City Council. An exhibit is provided as Attachment 4.

Item 4 – No Parking 373 Park Avenue
The TSC discussed a request from a resident to paint a red curb in front of 372 Park Avenue (Tract 2164).

TSC Recommendation:

A motion was made to reach out to the requesting resident and recommend if people are blocking the driveway to contact the Police Department for enforcement.

Motion by Benjamin Fine seconded by Jim Lewis, to approve the TSC recommendation.

Passed: 6/0/1
Ayes: Jim Lewis, Jorge Garcia, Benjamin Fine, Matt Downing, Daniel Herlihy, Paul Lee
Noes: None

Absent: Dave Daguerre
No action is required by City Council. An exhibit is provided as Attachment 5.

Council Agenda 11-15-2022Council Agenda 11-15-2022 9.F-3 Packet Page 67

Item 5 – No Parking 851 and 861 Visalia
The TSC discussed a request from a resident to install 10 feet of no-parking red curb, between 851 and 861 Visalia Street in support of mail delivery.

TSC Recommendation:

The TSC discussed the Vehicle Code, which allows vehicles to park in front of mailboxes.

If the City had to no-park in front of every mailbox, then there would be little parking left in certain neighborhoods.

A motion was made to deny the request and reach out to the requesting resident to communicate why.

Motion by Benjamin Fine seconded by Jorge Garcia, to approve the TSC recommendation.

Passed: 6/0/1
Ayes: Jim Lewis, Jorge Garcia, Benjamin Fine, Matt Downing, Daniel Herlihy, Paul Lee
Noes: None

Absent: Dave Daguerre
No action is required by City Council. An exhibit is provided as Attachment 6.

Item 6 – Price Street Lighting and Signage
The TSC discussed a request from staff to discuss lighting and signage on Price Street.

TSC Recommendation:

The TSC discussed the existing lighting on Price Street and that lighting along the corridor will not be upgraded until the Price Street Streetscape project is completed in the future.

The TSC does not see an issue with lighting or signage and sees only an enforcement issue.

The TSC did not take any action and will continue to monitor the safety aspect of Price Street and look at further implementation of modifications with the Price Street Master Plan.

Motion by Benjamin Fine seconded by Jim Lewis, to approve the TSC recommendation.

Passed: 6/0/1
Ayes: Jim Lewis, Jorge Garcia, Benjamin Fine, Matt Downing, Daniel Herlihy, Paul Lee
Noes: None

Absent: Dave Daguerre
No action is required by City Council. An exhibit is provided as Attachment 7.

Council Agenda 11-15-2022Council Agenda 11-15-2022 9.F-4 Packet Page 68

Conclusion and Recommendation
Staff recommends that the Council adopt the Resolution provided as Attachment 1.

FISCAL IMPACT:

There is no fiscal impact associated with receiving this report or implementing the Committee’s recommendation.

ALTERNATIVES:

1. Do not adopt the Resolution; provide alternative direction to staff.

ATTACHMENTS:

1. Resolution – Shell Beach Road Multi-Use Path Signage

2. Exhibit – Shell Beach Road Multi-Use Path Signage

3. Exhibit - Multi-Stop or Yield at Norma and Frances

4. Exhibit - Baxter Lane Parking

5. Exhibit - No Parking 373 Park Avenue

6. Exhibit - No Parking 851 and 861 Visalia Street

7. Exhibit - Price Street Lighting and Signage
Prepared by: Meeting Date: November 15, 2022
Madeline Kacsinta, Engineering Technician
Submitted by: Benjamin A. Fine, P.E., Director of Public Works/City Engineer City Manager Approval:

Council Agenda 11-15-2022Council Agenda 11-15-2022 9.F-5 Packet Page 69

RESOLUTION NO. R-2022-XXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PISMO BEACH, CALIFORNIA AUTHORIZING THE INSTALLATION OF UP TO 3 PEDESTRIAN AND BICYCLE SYMBOLLED SIGNS, UP TO 3 “YIELD TO PEDESTRIANS” SIGNS, AND UP TO 3 “BIKES REDUCE SPEED” SIGNS ALONG THE SHELL BEACH ROAD

MULTI-USE PATH
WHEREAS, the Traffic Safety Committee (TSC) met on October 18, 2022; and WHEREAS, the TSC heard from various community members who voiced concerns about bicyclists and pedestrians not having the proper signage along the Shell Beach Road multi-use path; and
WHEREAS, the multi-use path is intended for both pedestrians and bicyclists; and WHEREAS, a goal is to have bicyclists slow down and pedestrians be more cautious; and
WHEREAS, the primary objective is to reduce accidents with pedestrians and bicyclists; and
WHEREAS, the TSC would like to encourage commuting bicyclists to use Shell Beach Road and Mattie Road in lieu of the multi-use path.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pismo Beach hereby authorizes the installation of up to 3 pedestrian and bicycle symbolled signs, up to 3 “yield to pedestrians” signs, and up to 3 “bikes reduce speed” signs along the Shell Beach Road multi-use path.

UPON MOTION OF Council Member , seconded by Council Member , the foregoing resolution was adopted by the City Council of the City of Pismo Beach this 15th day of November 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

RECUSED:

Approved: Attest:
________________________ ________________________
Ed Waage, Mayor Erica Inderlied, City Clerk
Council Agenda 11-15-2022Council Agenda 11-15-2022 9.F-6 Attachment 1
Packet Page 70

Shell Beach Road
Multi-Use Path Signage
11/15/2022 Attachment 211
BIKES
REDUCE
SPEED
Attachment 2
Council Agenda 11-15-2022 9.F-7
Packet Page 71

Multi-Stop or Yield at
Norma and Frances
11/15/2022 Attachment 311
Attachment 3
Council Agenda 11-15-2022 9.F-8
Packet Page 72

Baxter Lane
11/15/2022 Attachment 411
Both sides of
Baxter Lane
were painted
red as a
result of the
February TSC
meeting.

Attachment 4
Council Agenda 11-15-2022 9.F-9
Packet Page 73

Tract 2164 – 372 Park
11/15/2022 Attachment 511
Attachment 5
Council Agenda 11-15-2022 9.F-10
Packet Page 74

No Parking between
851 & 861 Visalia Street
11/15/2022 Attachment 611
Photo provided by requesting resident
Photo provided by requesting resident
Attachment 6
Council Agenda 11-15-2022 9.F-11
Packet Page 75

Price Street
11/15/2022 Attachment 711
Attachment 7
Council Agenda 11-15-2022 9.F-12
Packet Page 76

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.G
SUBJECT/TITLE:

NOTICE OF COMPLETION FOR THE BELLO STREET BRIDGE REPLACEMENT

PROJECT
RECOMMENDATION:

Authorize the City Manager to sign, and the City Clerk to record, a Notice of Completion for the Bello Street Bridge Replacement Project.

BACKGROUND:

On April 21, 2020, the City Council awarded a contract to Papich Construction Co., Inc. (Papich Construction) for the Bello Street Bridge Replacement Project. Staff successfully obtained a Federal Highway Bridge Program (HBP) grant to fund the project, which replaced the existing bridge to restore a viable crossing of Pismo Creek and improve public safety and traffic circulation.

Conclusion and Recommendation
Papich Construction has completed the contracted services and the Bello Street Bridge Replacement project has been completed in accordance with the plans, specifications, and contract documents. Staff recommends that the City Council accept the project as complete and authorize the Notice of Completion (Attachment 1) to be recorded at the County Clerk’s office.

FISCAL IMPACT:

There is no direct fiscal impact associated with this action.

ALTERNATIVES:

1. Since Papich Construction has completed its contractual obligations, the only option recommended is for City Council to approve the Notice of Completion.

ATTACHMENTS:

1. Notice of Completion
Prepared by: Meeting Date: November 15, 2022
Erin Olsen, Management Analyst
Submitted by: Benjamin A. Fine, P.E., Director of Public Works/City Engineer City Manager Approval:

Council Agenda 11-15-2022 9.G-1
Packet Page 77

RECORDING REQUESTED BY:

WHEN RECORDED, RETURN TO:

CITY CLERK

CITY OF PISMO BEACH
760 MATTIE ROAD
PISMO BEACH, CA 93449

NO TRANSFERORS

This document is recorded for the benefit of the City of Pismo Beach, a Municipal Corporation, and is exempt from fee per Government Code Section 27383.

NOTICE OF COMPLETION AND ACCEPTANCE

FOR BELLO STREET BRIDGE REPLACEMENT PROJECT

NOTICE IS HEREBY GIVEN by the City of Pismo Beach in the County of San Luis Obispo, State of California, as follows:

1. That on the 15th of November 2022, the project hereunder described was considered completed and accepted by the City Council of the City of Pismo Beach.

2. That the description of said project is the construction of Bello Street Bridge Replacement Project, for the City of Pismo Beach.

3. That the name of the political subdivision controlling said project, and the owner of the land upon which the project was constructed, is the City of Pismo Beach, in the County of San Luis Obispo, State of California, whose address is 760 Mattie Road, Pismo Beach, CA 93449.

4. That the name of the owner/contractor on said project is Papich Construction Co., Inc., 398 Sunrise Terrace, Arroyo Grande, CA 93420.

5. The name of the Surety on the project is Arch Insurance Company, 865 S.

Figueroa St. #2700, Los Angeles, CA 90017.

I certify (or declare) under penalty of perjury that the foregoing is true and correct.

Date:

James R. Lewis, City Manager
Attest:

Erica Inderlied, City Clerk
Council Agenda 11-15-2022 9.G-2
Attachment 1
Packet Page 78

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.H
SUBJECT/TITLE:

ACCEPTANCE OF SELECTIVE TRAFFIC ENFORCEMENT PROGRAM (STEP)

FUNDING AWARD FROM THE OFFICE OF TRAFFIC SAFETY
RECOMMENDATION:

Adopt a Resolution accepting grant funds in the amount of $55,000 from the California Office of Traffic Safety, and appropriating $55,000 in grant revenues and $55,000 in various costs in the General Fund Police Department budget in FY 2023.

BACKGROUND:

The California Office of Traffic Safety (OTS) strives to eliminate traffic deaths and injuries by making available grants to local and state public agencies for programs that help them enforce traffic laws, educate the public in traffic safety, and provide varied effective means of reducing fatalities, injuries, and economic losses from collisions. OTS draws from several federal government funding sources for its grants and mounts public awareness campaigns, acting as the primary traffic safety resource in order to enlist the help of the general public and the media encouraging traffic safety. Each year, OTS notifies eligible agencies regarding the opportunity to participate in the grant program and the requirements to compete for available funds. Proposals are submitted addressing traffic safety problems from all interested and eligible agencies. A major area of concentration for awarded funding is in the area of alcohol-impaired driving.

The City has applied for and successfully obtained grant funding from OTS in the past.

Several of the grant awards were specific to driving under the influence (DUI) and impaired driver enforcement. The funding allowed for the procurement of DUI checkpoint equipment, a DUI Trailer, and DUI training to include travel, and funding overtime for officers working checkpoints and suppression patrols. The grant award will financially compensate overtime hours used by the Police Department to selectively enforce impaired driving throughout the holiday season to include spring break and the 4th of July celebrations. All equipment needed, advertising, educational material, and grant management cost is covered by the terms of the grant.

Some of the activities this grant will fund include but are not limited to: Traffic Safety education presentations with an effort to reach community members, DUI checkpoint operations, DUI saturation patrols, development and maintenance of a “DUI BOLO” program to notify patrol and traffic officers to be on the look-out for repeat DUI offenders, participating in data reporting for several different OTS campaigns, and sending law enforcement personnel to DUI related training courses.

Conclusion and Recommendation
Staff recommends that the Council adopt a Resolution (Attachment 1) authorizing the acceptance of grant funds in the amount of $55,000.00 from the Office of Traffic Safety for DUI prevention and enforcement activity, and appropriating $55,000 in grant revenues

9.H-1Council Agenda 11-15-2022
Packet Page 79

and $55,000 in various costs in the General Fund Police Department budget in FY 2023.

The grant agreement is provided as Attachment 2.

FISCAL IMPACT:

The fiscal impact of approving the attached Resolution is an additional $55,000 of grant revenues and $55,000 of expenditures in the FY 2023 General Fund Police Department budget, for a net $0 fiscal impact. This grant does not have a matching funds stipulation, nor are there any recurring costs.

If approved, staff recommends that Council appropriate the following in the FY 2023 General Fund Police Department Budget in the OTS grant:

FY 2023 General Fund Police Department Proposed Budget Adjustments Revenues
State Government Grant revenues $55,000
Expenditures
Overtime $44,000
Benefits 7,098
Training 2,575
Operating Supplies & Maintenance 1,327
Total Expenditures $55,000
Net Fiscal Impact (Revenues less Expenditures) $0 ALTERNATIVES:

1. Do not adopt the resolution; provide direction to staff.

2. Modify as appropriate and approve staff’s recommendations.

ATTACHMENTS:

1. Resolution

2. OTS Grant Agreement
Prepared by: Chris Trimble, Commander Meeting Date: November 15, 2022 Submitted by: Jeff Smith, Chief of Police
City Manager Approval:

9.H-2Council Agenda 11-15-2022
Packet Page 80

RESOLUTION NO. R-2022-XXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PISMO BEACH, CALIFORNIA ACCEPTING GRANT FUNDS IN THE AMOUNT OF $55,000 FROM THE CALIFORNIA OFFICE OF TRAFFIC SAFETY, AND APPROPRIATING $55,000 IN GRANT REVENUES AND $55,000 IN VARIOUS COSTS IN THE GENERAL FUND POLICE DEPARTMENT BUDGET IN FY 2023
WHEREAS, the California Office of Traffic Safety (OTS) strives to eliminate traffic deaths and injuries by making available grants to local and state public agencies for programs that help them enforce traffic laws, educate the public in traffic safety, and provide varied and effective means of reducing fatalities, injuries, and economic losses from collisions; and
WHEREAS, each year, OTS requests applications from more than 3,000 eligible law enforcement agencies outlining the opportunity to participate in the program and the requirements to compete for available funds; and
WHEREAS, the Pismo Beach Police Department applied for one of these grants and has been successfully awarded the amount of $55,000; and
WHEREAS, this funding will allow for additional proactive enforcement of impaired driving, traffic safety educational presentations with an effort to reach community members, DUI checkpoint operations, DUI saturation patrols, and additional DUI-related training for law enforcement personnel.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Pismo Beach hereby accepts the grant funds in the amount of $55,000 from the California Office of Traffic Safety to support the Traffic Safety Project as outlined in the Office of Traffic Safety Grant Agreement (Exhibit A).

BE IT FURTHER RESOLVED that the City Council of the City of Pismo Beach hereby appropriates $55,000 in State government grant revenues in the General Fund Police Department budget and $55,00 of expenditures (overtime, benefits, training, and operating supplies and maintenance) in the General Fund Police Department budget in Fiscal Year 2023.

UPON MOTION OF Council Member , seconded by Council Member , the foregoing resolution was adopted by the City Council of the City of Pismo Beach this 15th day of November 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Attachment 1

9.H-3Council Agenda 11-15-2022
Packet Page 81

RECUSED:

Approved: Attest:
________________________ ________________________
Ed Waage, Mayor Erica Inderlied, City Clerk
Attachment 1

9.H-4Council Agenda 11-15-2022
Packet Page 82

Packet Page 83

Attachment 2

9.H-6Council Agenda 11-15-2022
Packet Page 84

Attachment 2

9.H-7Council Agenda 11-15-2022
Packet Page 85

Attachment 2

9.H-8Council Agenda 11-15-2022
Packet Page 86

Attachment 2

9.H-9Council Agenda 11-15-2022
Packet Page 87

Attachment 2

9.H-10Council Agenda 11-15-2022
Packet Page 88

Attachment 2

9.H-11Council Agenda 11-15-2022
Packet Page 89

Attachment 2

9.H-12Council Agenda 11-15-2022
Packet Page 90

Attachment 2

9.H-13Council Agenda 11-15-2022
Packet Page 91

Attachment 2

9.H-14Council Agenda 11-15-2022
Packet Page 92

Attachment 2

9.H-15Council Agenda 11-15-2022
Packet Page 93

Attachment 2

9.H-16Council Agenda 11-15-2022
Packet Page 94

Attachment 2

9.H-17Council Agenda 11-15-2022
Packet Page 95

Attachment 2

9.H-18Council Agenda 11-15-2022
Packet Page 96

Attachment 2

9.H-19Council Agenda 11-15-2022
Packet Page 97

Attachment 2

9.H-20Council Agenda 11-15-2022
Packet Page 98

Packet Page 99

Attachment 2

9.H-22Council Agenda 11-15-2022
Packet Page 100

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #9.I

SUBJECT/TITLE:

ADOPTION OF FINDINGS RELATING TO AB 361 (VIRTUAL MEETINGS)

RECOMMENDATION:

Adopt the following findings with respect to the City of Pismo Beach’s utilization of the provisions of Assembly Bill 361, relating to Brown Act teleconferences:

1. The City Council has reconsidered the circumstances of the state of emergency created by the coronavirus pandemic.

2. The following circumstances exist:
• The state of emergency continues to directly impact the ability of the Council Members to meet safely in person.

BACKGROUND:

Assembly Bill 361 (Rivas, 2021) amends and codifies the relaxed Brown Act provisions that were originally implemented by Executive Orders of the Governor in response to the coronavirus pandemic. Among the provisions of the Brown Act that were relaxed by the Governor’s Orders were provisions for participation in legislative meetings by teleconference (phone, or virtual platform such as Zoom). Prior Brown Act provisions required that, in the event any legislative body member(s) wished to participate in a meeting remotely, the exact address of the remote location(s) be published in advance on the meeting agenda, the remote location(s) be disabled-accessible, and the public be provided the opportunity to observe the meeting and make public comment at the remote location(s).

Governor’s Orders N-29-20 and N-08-21 effectively suspended all of these provisions for health and safety reasons, making it possible for legislative body members to join a meeting virtually without the need for conducting advance noticing or providing direct public access to the location. AB 361, effective October 1, 2021, functionally codifies these provisions through January 2024, allowing agencies to avail themselves of the continued teleconferencing option if desired, provided that the legislative body makes certain findings as outlined below (Government Code Section 54953(e)(3)):

(3) If a state of emergency remains active, or state or local officials have imposed or recommended measures to promote social distancing, in order to continue to teleconference without compliance with paragraph (3) of subdivision (b), the legislative body shall, not later than 30 days after teleconferencing for the first time pursuant to subparagraph (A), (B), or (C) of paragraph (1), and every 30 days thereafter, make the following findings by majority vote:
(A) The legislative body has reconsidered the circumstances of the state of emergency.
(B) Any of the following circumstances exist:
(i) The state of emergency continues to directly impact the ability of the members to meet safely in person.

Council Agenda 11-15-2022 9.I-1
Packet Page 101

(ii) State or local officials continue to impose or recommend measures to promote social distancing.

The City Council inaugurated its use of AB 361 provisions by holding a totally teleconferenced meeting via Zoom on October 5, 2021, and then adopted the recommended findings at each of its regular meetings since October 19, 2021. Following the state’s removal of the indoor mask mandate for vaccinated individuals on February 16, 2022, the City Council transitioned to fully hybrid meetings where the legislative body members, staff, and the public may attend the meeting either in person, or virtually.

Procedural Flexibility
The circumstances surrounding the impact of the coronavirus pandemic are continually evolving, and the progression of the pandemic, along with accompanying governmental health and safety directives, are difficult to foresee. While the Council has determined to transition to hybrid City Council meetings with a certain level of in-person participation, staff recommends that the adoption of these findings, as recommended, remain on the Council’s consent agenda for the foreseeable future, until such time that the Council determines that it can no longer make the findings due to a change in circumstance.

Adoption of the recommended findings at each meeting will provide continued flexibility should the Council need or desire to make a change to its meeting practices at any point in the future. Adoption of the findings in no way commits the City to holding virtual or hybrid meeting proceedings, providing full flexibility under uncertain circumstances.

Other Provisions of AB 361
AB 361 also requires that the public be given the opportunity to address the legislative body with their comments in real time, which the City has provided continuously since the start of the pandemic, and will continue to. In addition, the bill requires that meeting proceedings be stopped in the event that the public’s virtual access to a meeting is disrupted, for example due to an internet outage. When holding a hybrid meeting with some or all members participating in person, and some or all of the public participating virtually, staff will monitor the virtual meeting to component to assure that public access is not interrupted, and pause meeting proceedings in the event of a disruption.

Conclusion and Recommendation
In order to provide both legal compliance and practical flexibility during ongoing uncertain circumstances, staff recommends that, by minute order, the City Council make the following findings with respect to the City of Pismo Beach’s utilization of the provisions of Assembly Bill 361, relating to Brown Act teleconferences:

1. The City Council has reconsidered the circumstances of the state of emergency created by the coronavirus pandemic.

2. The following circumstances exist:
• The state of emergency continues to directly impact the ability of the Council Members to meet safely in person.

Council Agenda 11-15-2022 9.I-2
Packet Page 102

FISCAL IMPACT:

There is no fiscal impact associated with adoption of the recommended findings.

ALTERNATIVES:

1.Do not adopt the findings; provide other direction to staff.

ATTACHMENTS:

None.

Submitted by: Meeting Date: November 15, 2022
Erica Inderlied, City Clerk
City Manager Approval:

Council Agenda 11-15-2022 9.I-3
Packet Page 103

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #11.A

SUBJECT/TITLE:

ADOPTION (SECOND READING) OF AN ORDINANCE THAT ADOPTS BY

REFERENCE AND AMENDS THE LATEST EDITIONS OF THE CONSTITUENT

CODES OF THE CALIFORNIA BUILDING STANDARDS CODE, MAKES FINDINGS

OF FACT TO SUPPORT THE AMENDMENTS, AND MAKES A DETERMINATION OF

EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

RECOMMENDATION:

1. Conduct a public hearing to receive input;

2. Adopt an Ordinance amending Titles 8 and 15, Chapters 8.04, 8.08, 15.04, and

15.08 of the Pismo Beach Municipal Code; adopting by reference codes comprising the 2022 California Building Standards Code (California Code of Regulations, Title 24, Parts 1-12), including the California Fire Code (2022 Edition, incorporating and amending the 2021 International Fire Code); the California Building Code Volumes 1 and 2 (2022 Edition, incorporating and amending the 2021 International Building Code), the California Residential Code (2022 Edition, incorporating and amending the 2021 International Residential Code), the California Electrical Code (2022 Edition, incorporating and amending the 2020 National Electrical Code), the California Mechanical Code (2022 Edition, incorporating and amending the 2021 Uniform Mechanical Code, the California Plumbing Code (2022 Edition, incorporating and amending the 2021 Uniform Plumbing Code), the California Energy Code (2022 Edition), the California Historical Building Code (2022 Edition), the California Green Building Standards Code (2022 Edition), and the 2021 International Property Maintenance Code together with certain amendments thereto; adopting findings of facts to support the imposition of requirements other than those of the California Building Standards Code, and making a determination of exemption under CEQA.

BACKGROUND:

The City is required to comply with the building and fire codes adopted by the State of California, which are updated every three years. The code editions recently adopted by the State will be effective January 1, 2023. These codes can be modified locally to reflect unique situations or special needs, and the City must adopt these local modifications as part of the Municipal Code in order to coordinate the City's building and fire codes with the State's codes.

On November 1, 2022, the City Council voted to introduce an ordinance (Attachment 1) adopting the aforementioned codes by reference, making certain local amendments to the codes, and making a determination of exemption under the California Environmental Quality Act. The ordinance is now being returned to the Council for second reading and adoption.

Council Agenda 11-15-2022 11.A-1
Packet Page 104

The agenda report for the November 1, 2022 agenda item, which includes background and technical analysis, including full strike-and-underscore markup for all code changes, is available in the Access Pismo public records portal at www.pismobeach.org/accesspismo1 , or upon request from the City Clerk’s Office.

Procedural Considerations
Government Code Sections 50022.1 through 50022.10 set forth the procedures by which a city may adopt codes by reference. In accordance with these Code Sections, the date of a public hearing is set at the Ordinance’s introduction (first reading), and the public hearing on the Ordinance occurs at the time of its adoption (second reading).

Accordingly, following the introduction and full reading of the title of the Ordinance (Attachment 1) on November 1, 2022, the Council set this public hearing date for adoption (second reading) of the ordinance.

Conclusion and Recommendation
To provide consistency with State of California construction code mandates and enable local amendments to the new constituent codes, staff recommends that the City Council conduct a public hearing to receive public input, and then adopt an Ordinance (Attachment 1) amending Titles 8 and 15, Chapters 8.04, 8.08, 15.04, and 15.08 of the Pismo Beach Municipal Code; adopting by reference, and making certain local amendments to, certain codes comprising the 2022 California Building Standards Code and the 2021 International Property Maintenance Code, and making a determination of exemption under CEQA.

If the Council acts to adopt the ordinance at this juncture, it will become effective by statute on December 15, 2022, and be implemented beginning January 1, 2023.

FISCAL IMPACT:

There is no direct fiscal impact from staff’s recommended action. Costs associated with codification of this ordinance and enforcement of its provisions will be absorbed by the adopted budget.

ALTERNATIVES:

1. Pismo Beach Municipal Code 2.04.340 automatically waives full readings of Ordinances unless the Council directs otherwise; the Council may opt to have staff conduct a second reading in full, and then take action on the Ordinance.

2. Amend the Ordinance and return it for another first reading and introduction.

3. Decline to adopt the Ordinance. Compensation would remain unchanged.

ATTACHMENTS:

1. Ordinance as introduced

1 Full URL:
https://accesspismo.pismobeach.org/WebLink/DocView.aspx?id=451924&dbid=0&repo=Laserfiche Council Agenda 11-15-2022 11.A-2
Packet Page 105

Prepared by: Erica Inderlied, City Clerk Meeting Date: November 15, 2022 Submitted by: Matthew Downing, Community Development Director City Manager Approval:

Council Agenda 11-15-2022 11.A-3
Packet Page 106

ORDINANCE NO. O-2022-XXX

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PISMO BEACH, CALIFORNIA AMENDING TITLES 8 AND 15, CHAPTERS 8.04, 8.08, 15.04, AND

15.08 OF THE PISMO BEACH MUNICIPAL CODE; ADOPTING BY REFERENCE CODES COMPRISING THE 2022 CALIFORNIA BUILDING STANDARDS CODE (CALIFORNIA CODE OF REGULATIONS, TITLE 24, PARTS 1-12), INCLUDING THE CALIFORNIA FIRE CODE (2022 EDITION, INCORPORATING AND AMENDING THE 2021 INTERNATIONAL FIRE CODE), THE CALIFORNIA BUILDING CODE VOLUMES 1 AND 2 (2022 EDITION, INCORPORATING AND AMENDING THE 2021 INTERNATIONAL BUILDING CODE), THE CALIFORNIA RESIDENTIAL CODE (2022 EDITION, INCORPORATING AND AMENDING THE 2021 INTERNATIONAL RESIDENTIAL CODE), THE CALIFORNIA ELECTRICAL CODE (2022 EDITION, INCORPORATING AND AMENDING THE 2020 NATIONAL ELECTRICAL CODE), THE CALIFORNIA MECHANICAL CODE (2022 EDITION, INCORPORATING AND AMENDING THE 2021 UNIFORM MECHANICAL CODE), THE CALIFORNIA PLUMBING CODE (2022 EDITION, INCORPORATING AND AMENDING THE 2021 UNIFORM PLUMBING CODE), THE CALIFORNIA ENERGY CODE (2022 EDITION), THE CALIFORNIA HISTORICAL BUILDING CODE (2022 EDITION), THE CALIFORNIA EXISTING BUILDING CODE (2022 EDITION), THE CALIFORNIA GREEN BUILDING STANDARDS CODE (2022 EDITION), AND THE 2021 EDITION

OF THE INTERNATIONAL PROPERTY MAINTENANCE CODE TOGETHER WITH CERTAIN AMENDMENTS THERETO; ADOPTING FINDINGS OF FACT TO

SUPPORT THE IMPOSITION OF REQUIREMENTS OTHER THAN THOSE OF THE CALIFORNIA BUILDING STANDARDS CODE; AND MAKING A DETERMINATION

OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT WHEREAS, the California Health and Safety Code Section 18938(b) provides that building standards adopted by the Building Standards Commission, including those contained in certain model codes and adopted by reference into the most recent edition of the California Building Standards Code, shall apply to all occupancies in the state and shall become effective 180 days after publication in the California Building Standards Code by the California Building Standards Commission (the “Commission”) or at a later date after publication established by the Commission; and WHEREAS, the California Building Standards Commission published the 2022 Edition of the California Building Standards Code on July 1, 2022, with an effective date of January 1, 2023, including the 2022 California Building, Residential, Electrical, Mechanical, Plumbing, Energy, Historical Building, Fire, Existing Building, and Green Building Codes, incorporated into Title 24 of the California Code of Regulations as Parts 2, 2.5, 3, 4, 5, 6, 8, 9, 10, and 11, respectively; and
WHEREAS, California Government Code Section 50022.1, et seq. authorizes the City to adopt codes by reference, in whole or in part, as a primary code, and that the primary code may adopt by reference a secondary code, in whole or in part; and Attachment 1
Council Agenda 11-15-2022 11.A-4
Packet Page 107

WHEREAS, it is the desire and intent of the City Council of the City of Pismo Beach to adopt Codes comprising the 2022 California Building Standards Code (Title 24, Parts 1- 12, of the California Code of Regulations), including the 2022 California Building, Residential, Electrical, Mechanical, Plumbing, Energy, Historical Building, Fire, Existing Building and Green Building Codes and to adopt the 2021 International Property Maintenance Code; and

WHEREAS, the City Council held a public hearing on November 15, 2022, at which time all interested persons had the opportunity to appear and be heard on the matter of adopting the Codes, as amended therein; and

WHEREAS, it is the desire and intent of the City Council of the City of Pismo Beach to provide citizens with the greatest degree of fire, life and structural safety in buildings in the most cost-effective manner by adopting that body of regulations referred to as the California Building Standards Code with amendments specific to the City of Pismo Beach; and

WHEREAS, the California Health and Safety Code, Section 17958 provides that the California Building Standards Code shall be applicable to cities and shall become effective 180 days after publication by the California Building Standards Commission provided cities do not make any modifications or changes to the California Building Standards Code; and

WHEREAS, Section 17958.7 and Section 18941.5, require the City Council, before making any modifications or changes to the California Building Standards Code pursuant to Health and Safety Code Sections 18941.5 and 17958.5, to make an express finding that each such modification or change is needed; and

WHEREAS, the California Health and Safety Code Section 17958.7 requires that such changes must be determined to be reasonably necessary because of local climatic, geological, or topographical conditions; and

WHEREAS, such findings must be made available as a public record and a copy thereof with each such modification or change shall be filed with the State of California Building Standards Commission; and

WHEREAS, the City Council hereby determines that Sections 502.1, 903.2, 903.3, 903.3.5, 905.3.1, 907.6.6, 1030.1, 1506, 3201, and 3202 of the 2022 California Building Code, Sections R310.1, R312.1.5, R313.2, R313.3.1.2, R313.3.5, R319.1, R326.1 and R904 of the 2022 California Residential Code, Article 230.70(A)(1) of the 2022 California Electrical Code, Sections 1501.3, 1503.1.1 and 1503.7 of the 2022 California Plumbing Code, and Sections 405.7, 503, 504.3, 505, 507.5.1, 603, 903.2, 903.3, 903.3.5, 905.3.1, 907.6.6, 2306.2.3, 5504.3, 5601, 5704, 5706 and 6104.2 of the 2022 California Fire Code, are required to be modified due to the findings contained herein to requirements other than those set forth in the California State Building Standards Code; and Attachment 1
Council Agenda 11-15-2022 11.A-5
Packet Page 108

WHEREAS, the City Council finds that each of the changes or modifications to measures referred to therein are reasonably necessary because of local climatic, geological, or topographical conditions in the area encompassed by the boundaries of the City of Pismo Beach, and the City Council further finds that the following findings support the local necessity for the changes or modifications:

FINDING 1
That the City of Pismo Beach lies approximately midway between the major population centers of San Francisco and Los Angeles, making mutual aid resources from these centers delayed. Furthermore, within San Luis Obispo County, organized fire departments are characteristically at such distance and of such limited resources that they may not present a reliable rapid response mutual aid alternative, although agreements currently exist. The continued development in new residential areas within the City and potential annexation areas will increase response times for personnel, creating a substantial threat to human life and public safety. The afore-described conditions support the imposition of fire protection requirements greater than those set forth in the California State Building Standards Code and, in particular, support the imposition of greater requirements than set forth in Sections 502.1, 903.2, 903.3.5.3, 905.3.1, 1030.1 and 1506 of the 2022 California Building Code, Sections R310.1, R313.2, R313.3.1.2, R313.3.5, R319.1 and R904.5 of the 2022 California Residential Code, and Sections 503, 504.3, 505.1, 903.2, 903.3.5, 905.3.1, 907.6.6, 2306, 5601.1, 5704.2.9.6, 5706.2.4.4, and 6104.2 of the 2022 California Fire Code.

FINDING 2
That on the inland side of the City of Pismo Beach lie large expanses of steep, undeveloped terrain with moderate to high wild-land fuel loading. Furthermore, a wild- land fire in these areas, in conjunction with coastal winds, Santa Ana winds, and similar dry, conditions could threaten the City with burning embers traveling thousands of feet that will ignite structures. City fire-suppression resources will be inadequate to resist this threat. The protection of human life and the preservation of property in the event of such an occurrence support the imposition of fire protection requirements greater than those set forth in the California State Building Standards Code and in particular support the imposition of greater requirements than set forth in Sections 502.1, 903.2, 903.3.5.3, 905.3.1, and 1506.4 of the 2022 California Building Code, Sections R310.1, R313.2, R313.3.1.2, R313.3.5.4, R319.1 and R904.5 of the 2022 California Residential Code, and Sections 503, 504.3, 505.1, 903.2, 903.3.5.3, 905.3.1, 907.6.6, 2306.2.3, 5601.1.3, 5704.2.9.6, 5706.2.4.4, and 6104.2 of the 2022 California Fire Code.

FINDING 3
That the City of Pismo Beach is bisected by Highway 101, and there are only six arterial crossovers along seven miles of City boundary bisected by said highway. This condition increases the response times for fire apparatus, especially during peak traffic flows. A delayed response due to this condition poses a substantial threat of fire to human life, public safety, and the preservation of property and support the imposition of fire protection requirements greater than those set forth in the California State Building Standards Code, and in particular, support the imposition of greater requirements than set forth in Sections Attachment 1
Council Agenda 11-15-2022 11.A-6
Packet Page 109

502.1, 903.2, 903.3.5.3, 905.3.1, and 1506.4 of the 2022 California Building Code, Sections R310.1, R313.2, R313.3.1.2, R313.3.5.4, R319.1 and R904.5 of the 2022 California Residential Code, and Sections 405.7, 503, 504.3, 505.1, 903.2, 903.3.5.3, 905.3.1, 907.6.6, 5601.1.3, 5704.2.9.6, 5706.2.4.4, and 6104.2 of the 2022 California Fire Code.

FINDING 4
That the City of Pismo Beach is bisected by a major freeway (Highway 101), traversing in the north/south direction, and is subject to floods and earthquakes which create impassable roads and collapsed bridges. Emergency personnel responding to a fire may be unduly impeded or delayed in accomplishing an emergency response as a result of this situation, with the potential result of undue and unnecessary risk to the protection of life and public safety, particularly in those buildings or structures without the protection of automatic fire sprinklers. The afore-described conditions support the imposition of fire protection requirements greater than those set forth in the California State Building Standards Code, and in particular support the imposition of greater requirements than set forth in Sections 502.1, 903.2, 903.3.5.3, 905.3.1, and 1506.4 of the 2022 California Building Code, Sections R310.1, R313.2, R313.3.5.4 Rand R904.5 of the 2022 California Residential Code, Section 230.70(A)(1) of the 2022 California Electrical Code, and Sections 503, 504.3, 505.1, 903.2, 903.3.5.3, 905.3.1, 2306.2.3, 5601.1.3, 5704.2.9.6, 5706.2.4.4, and 6104.2 of the 2022 California Fire Code.

FINDING 5
That the City of Pismo Beach lies in a coastal climate zone associated with the Pacific Ocean that creates corrosive moisture conditions damaging to exterior building system components supports the imposition of greater fire sprinkler system component requirements than set forth in Section 903.3.10 of the 2022 California Building Code and Section 903.3.10 of the 2022 California Fire Code.

NOW, THEREFORE, the City Council of the City of Pismo Beach does ordain as follows:

SECTION 1.

The foregoing recitals are adopted as findings of fact in support of this ordinance.

SECTION 2.

The provisions of Part 9 of the California Building Standards Code, known as the California Fire Code, are hereby modified, changed and amended, as provided for in this ordinance, based upon the foregoing recitals and findings. The City Council takes said action because of the public interest in protecting life and preserving public safety and property. Chapters 8.04 and 8.08 of the Pismo Beach Municipal Code are hereby repealed and replaced by new Chapters 8.04 and 8.08 as follows.

Attachment 1
Council Agenda 11-15-2022 11.A-7
Packet Page 110

Chapter 8.04 GENERAL PROVISIONS

8.04.010 Adoption of fire code.

One document on file in City offices, marked and designated as the 2022 edition of the California Fire Code is hereby adopted, including chapters and sections not adopted by agencies of the State of California, and including appendices thereto, as the Fire Prevention Regulations of the City of Pismo Beach. The provisions of such are hereby referred to, adopted, and made a part hereof as if fully set out in this Chapter except as modified in Chapter 8.08.

8.04.020 Fire code official designated.

The Fire Chief is hereby designated as the fire code official for the City of Pismo Beach.

8.04.030 Referenced codes and standards.

Where other codes and standards are referred to in the code adopted in Section

8.04.010, the following shall apply:

A. International Building Code shall mean California Building Code or California Residential Code, as applicable.

B. International Plumbing Code shall mean California Plumbing Code.

C. International Fuel Gas Code shall mean California Plumbing Code.

D. International Mechanical Code shall mean California Mechanical Code.

E. NFPA 70 and National Electrical Code shall mean California Electrical Code.

F. International Residential Code for One- and Two-family Dwellings shall mean California Residential Code.

G. International Fire Code shall mean California Fire Code.

H. International Existing Building Code shall mean the California Existing Building Code.

Chapter 8.08 FIRE PREVENTION REGULATIONS

8.08.010 Amendments; California Fire Code.

The California Fire Code adopted in Section 8.04.010 is modified, amended and/or supplemented as follows:

Attachment 1
Council Agenda 11-15-2022 11.A-8
Packet Page 111

A. Delete Appendices A, D, E, G, J, K, L, M, and N.

B. Amend Section 101.1 to read as follows:

101.1 Title. These regulations shall be known as the California Fire Code, hereinafter referred to as “this Code”.

C. Amend Section 102.3 to read as follows:

102.3 Change of use or occupancy. A change of occupancy in a building or structure shall not be made unless such building or structure is made to comply with this code, the California Building Code and the California Existing Building Code.

Exception: Where approved by the building official and the fire code official, a change of use or occupancy shall be permitted without complying with all requirements of this code, the California Building Code and the California Existing Building Code, provided that the new or proposed use or occupancy is less hazardous, based on life and fire risk, than the existing use or occupancy.

D. Amend Section 103.1 to read as follows:

103.1 General. The bureau of fire prevention is established within the jurisdiction under the direction of the fire code official. The function of the bureau shall be the implementation, administration and enforcement of the provisions of this code.

E. Add Section 103.3.1 to read as follows:

103.3.1 Fire prevention bureau personnel and police. The chief of the fire department and other members of the California Department of Forestry and Fire Protection/Pismo Beach Fire Department designated by the chief of the fire department have the authority of peace officers or public officers pursuant to California Penal Code sections 830.2(g), 830.7(d) and 836.5(a) in performing their duties under the California Fire Code.

F. Add Section 104.5.1 to read as follows:

104.5.1 Citations. The fire code official, or duly authorized agent, is granted the authority as provided in Section 836.5(a) of the California Penal Code to issue citations for violations of this chapter.

Attachment 1
Council Agenda 11-15-2022 11.A-9
Packet Page 112

G. Amend Section 105.3.3 to read as follows:

105.3.3 Occupancy and use prohibited before approval. The building or structure shall not be occupied prior to the fire code official issuing a permit and conducting associated inspections indicating that applicable provisions of this code have been met. No appliance, device, equipment, or system shall be operated or used until the installation has been approved and permitted by the fire code official and all applicable provisions of this code have been met. It shall be the duty of the permit applicant or contractor or both to cause the work to remain accessible and exposed for inspection purposes.

H. Add Section 105.6.52 to read as follows:

105.6.52 Commercial barbecue pits. All commercial barbecues shall comply with the requirements set forth in Chapter 8.36 of the Municipal Code.

I. Amend Section 109.1 to read as follows:

109.1 Board of appeals established. In order to hear and decide appeals of orders, decisions or determinations made by the fire code official relative to the application and interpretation of this code, there shall be and is hereby created a board of appeals. The City Manager shall provide staff services for the board. The board of appeals shall be appointed on an “as needed” basis by the City Council and shall hold office at its pleasure. The fire code official shall be an ex officio member of said board but shall have no vote on any matter before the board. The board shall adopt rules of procedure for conducting its business, and shall render all decisions and findings in writing to the appellant with a duplicate copy to the fire code official. The fee for appeals shall be consistent with the fees established by the City Council.

J. Amend Section 110.4 to read as follows:

110.4 Violation penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, alters, or repairs a building or structure in violation of the approved construction documents or directive of the fire code official, or of a permit or certificate issued under the provisions of this code and from which no appeal has been taken, or who shall fail to comply with such an order as affirmed or modified by the board of appeals within the time fixed herein, shall be guilty of a misdemeanor, and is subject to the penalty as provided for in Chapter 1.20 of the City of Pismo Beach Municipal Code. The imposition of one penalty for any violation shall not excuse the violation or permit it to continue. All such persons shall be required to correct or remedy such violations or defects within a reasonable time and, when not otherwise Attachment 1
Council Agenda 11-15-2022 11.A-10
Packet Page 113

specified, each day that prohibited conditions are maintained shall constitute a separate offense. The application of the above penalty shall not be held to prevent the enforced removal of prohibited conditions.

K. Amend Section 112.4 to read as follows:

112.4 Failure to comply. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to the penalties and code enforcement procedures set forth in Chapters 1.20, 1.24 and 1.28 of the City of Pismo Beach Municipal Code.

L. Amend Section 405.7 to read as follows:

405.7 Initiation. Where a fire alarm system is provided, emergency evacuation drills shall be initiated by activating the fire alarm system. Prior to initiating an alarm, the person initiating the alarm shall contact the fire alarm monitoring company and advise the company’s dispatcher of the fire drill. In cases where the fire alarm system is not monitored by a central station, notification shall be provided to the fire department dispatch center.

M. Add Section 503.1.2.1 to read as follows:

503.1.2.1 Maximum dead-end road lengths. The maximum length of dead-end road, including all dead-end roads accessed from that dead-end road, shall not exceed 500 feet (152 m).

N. Amend Section 503.2.7 to read as follows:

503.2.7 Grade. The grade of the fire apparatus access road shall not exceed 16% without approval of the fire code official.

O. Amend Section 504.3 to read as follows:

504.3 Stairway access to roof. New buildings two or more stories above grade plane, except those with a roof slope greater than four units vertical in 12 units horizontal (33.3-percent slope), shall be provided with a stairway to the roof or other access to the roof for emergency personnel approved by the fire code official. Stairway access to the roof shall be in accordance with Section 1011.2. Such stairway or other approved access shall be marked at street and floor levels with a sign indicating that the stairway or access continues to the roof. Where roofs are used for roof gardens or for other purposes, stairways shall be provided as required for such occupancy classification.

Attachment 1
Council Agenda 11-15-2022 11.A-11
Packet Page 114

P. Amend Section 505.1 and add Section 505.1.1 to read as follows:

505.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in apposition that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Numbers shall not be spelled out. Address numbers shall be Arabic numbers or alphabetical letters. Each character shall be not less than 6 inches (152.4 mm) high for residential buildings and 8 inches (203.2 mm) for non-residential buildings, with a minimum stroke of 0.5 inch (12.7 mm), unless otherwise required to be greater in height or of reflective material as determined by the fire code official during the jurisdiction’s development review process for a specific project. Where required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole other sign or means shall be used to identify the structure. Address identification shall be maintained.

505.1.1 Directories. When required by the fire code official, complexes with multiple buildings may be required to provide directories, premises maps and directional signs. The scale, design and location of directory signs shall be approved by the fire code official and may be required to be illuminated.

Q. Amend Section 507.5.1 to read as follows:

507.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.

Exception: For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section R313 of the California Residential Code or Section 903 of the California Building Code and this code, as amended, the distance requirement shall be not more than 600 feet (183 m).

R. Amend Section 603.1.4 to read as follows:

603.1.4 Fuel oil. The grade of fuel oil used in a burner shall be that for which the burner is approved and as stipulated by the burner manufacturer. Oil containing gasoline shall not be used.

Attachment 1
Council Agenda 11-15-2022 11.A-12
Packet Page 115

S. Amend Section 603.9 to read as follows:

603.9 Gas meters. Above-ground gas meters, regulators and piping subject to damage shall be protected by a barrier complying with Section 312 or otherwise protected in an approved manner. Gas meters shall be permanently marked identifying the building or system served.

T. Delete Sections 903.2 through 903.2.11.3. Add new Sections 903.2 and 903.2.1 through 903.2.11.3 to read as follows:

903.2 Where required. An approved automatic fire sprinkler system shall be installed:

1. Throughout new buildings.

Exceptions:

1. A single-story building that contains any occupancy other than Group R, H or I where floor area does not exceed
1000 square feet (92.9 m2).

2. A building containing a Group R, Division 3 occupancy not more than three stories above grade plane in height shall comply with the automatic fire sprinkler system
requirements of Section R313 of the California Residential Code.

3. A building that contains only a Group A, Division 5
occupancy. Notwithstanding the foregoing exception,
concession stands, retail areas, press boxes and other
accessory use areas in excess of 1,000 square feet (93
m2) shall be provided with an automatic fire sprinkler
system.

2. Throughout existing and new sections of an existing building where floor area is increased by 1000 square feet (92.9 m2) or where the floor area of a room or rooms altered exceeds fifty (50) percent of the existing building floor area. Increase in floor area and area of alterations shall be cumulative from January 1, 2008, with each issuance of a building permit, regardless of any change of ownership.

Exceptions:

1. Alterations limited to replacement of exterior coverings, windows, roofing, electrical services, sewer laterals,
retaining walls, and routine plumbing, electrical and
mechanical repairs.

2. A building containing a Group R, Division 3 occupancy not more than three stories above grade plane in height shall comply with the automatic fire sprinkler system
Attachment 1
Council Agenda 11-15-2022 11.A-13
Packet Page 116

requirements of Section R313 of the California Residential Code.

3. Throughout existing and new sections of an existing building where an additional story is added.

Exception: A building that contains a Group R, Division 3 occupancy that will not be more than three stories above grade plane in height shall comply with the automatic fire sprinkler system requirements of Section R313 of the
California Residential Code.

4. In additions to existing buildings equipped with an automatic fire sprinkler system.

5. Throughout existing and new sections of an existing building where there is an occupancy classification change resulting in a higher hazard as determined by Table 903.2(5).

Table 903.2(5)
Hazard Categories

6. In buildings, or portions thereof, where cellulose nitrate film or pyroxylin plastics are manufactured, stored or handled in quantities.

7. Throughout a manufactured home, multi-family manufactured home, commercial coach, or mobile home.

Exceptions:

1. A commercial coach where floor area does not exceed
1,000 square feet (92 m2).

2. A temporary commercial coach not equipped with
automatic fire sprinklers.

3. A mobile home constructed before March 13, 2011 and not equipped with automatic fire sprinklers.

For the purpose of requiring the automatic fire sprinkler systems specified in this chapter, the floor area within the surrounding exterior walls shall be considered as one building. For the purpose of calculating square footage Relative Hazard Occupancy Classifications
1 (Highest Hazard) H
2 I-2, I-3, I-4
3 A, E, I-1, M, R-1, R-2, R-4
4 B, F-1, R-3, S-1
5 (Lowest Hazard) F-2, S-2, U
Attachment 1
Council Agenda 11-15-2022 11.A-14
Packet Page 117

for the application of fire sprinkler requirements and fire flow requirements, the floor area shall be as defined by Floor Area Gross found in Section 202 of this code.

903.2.1 through 903.2.11.3 not used. Text continues with Section 903.2.11.4.

U. Add Section 903.3.5.3 to read:

903.3.5.3 Minimum water supply. The minimum water supply for an automatic residential fire sprinkler system designed in accordance with Section R313 of the California Residential Code or NFPA 13D shall be not less than a 1-inch nominal pipe size for the service lateral from the water main to the water meter location and not less than a 1-inch water meter.

V. Add Section 903.3.10 to read as follows:

903.3.10 Exterior locations. Automatic fire sprinklers installed at exterior locations shall be approved corrosion-resistant devices.

W. Amend Section 905.3.1, with all Exceptions to remain unmodified, to read as follows:

905.3.1 Building height and area. In other than Group R-3 and R-3.1 occupancies, Class III standpipe systems shall be installed throughout at each floor where any of the following occur:

1. Buildings where the floor level of the highest story is located more than 30 feet (9144 mm) above the lowest level of the fire department vehicle access.

2. Buildings where the floor level of the lowest story is located more than 30 feet (9144 mm) below the highest level of fire department vehicle access.

3. Buildings that are two or more stories below the highest level of fire department vehicle access.

4. A parking structure.

A building that is greater than 20,000 square feet (1.858 m2) of floor area and greater than 18 feet (5.49 m) in height shall have a dry or wet standpipe system with a 2-½ inch (64 mm) outlet at the roof near the roof access.

Location of the outlet and the fire department connection to the standpipe shall be labeled and approved by the fire code official.

Attachment 1
Council Agenda 11-15-2022 11.A-15
Packet Page 118

X. Amend Section 907.6.6 to read as follows:

907.6.6 Monitoring. Fire alarm systems required by this chapter or by the California Building Code shall be monitored by an approved central station service listed by Underwriters Laboratory for receiving fire alarms in accordance with NFPA 72 and this section. The central station shall contact and notify the police/fire dispatch center immediately on notification of an alarm and prior to making contact with the protected premises.

Exceptions: Monitoring by a central station is not required for:

1. Single- and multiple-station smoke alarms required by Section 907.2.11.

2. Group I-3 occupancies shall be monitored in accordance with Section 907.2.6.3.

3. Automatic sprinkler systems in one- and two-family dwellings.

Y. Amend Section 2306.2.3 to read as follows:

2306.2.3 Above-ground tanks located outside, above grade. Above- ground tanks shall not be used for the storage and dispensing of Class I, II, or III liquid motor fuels except when approved by the fire code official and in accordance with this Section, Section 5704.2.7 and Sections 5704.2.9.6 through 5704.2.9.6.3 and the stored fuels will not be offered for resale.

1. Above-ground tanks used for outside, above-grade storage of Class I liquids shall be listed and labeled as protected above-ground tanks in accordance with UL2085 and shall be in accordance with Chapter

57. Such tanks shall be located in accordance with Table 2306.2.3.

2. Above-ground tanks used for outside, above-grade storage of Class II or IIIA liquids shall be listed and labeled as protected above-ground tanks in accordance with UL2085 and shall be installed in accordance with Chapter 57. Tank locations shall be in accordance with Table 2306.2.3.

3. Tanks containing fuels shall not exceed 8,000 gallons (30 274 L) in individual capacity or 16,000 gallons (60 549 L) in aggregate capacity. Installations with the maximum allowable aggregate capacity shall be separated from other such installations by not less than 100 feet (30 480 mm).

4. Tanks located at farms, construction projects, or rural areas shall comply with Section 5706.2.

5. Above-ground tanks used for outside storage of Class IIIB liquid motor fuel shall be listed and labeled in accordance with UL 142 or Attachment 1
Council Agenda 11-15-2022 11.A-16
Packet Page 119

shall be listed and labeled as protected above-ground tanks in accordance with UL 2085 and shall be installed in accordance with Chapter 57. Tank locations shall be in accordance with Table 2306.2.3.

Z. Amend Section 5504.3 to read as follows:

5504.3 Outdoor storage. Storage of flammable cryogenic fluids in stationary containers outside of buildings is prohibited, except when permitted by the City and approved by the fire code official. Where outdoor storage of cryogenic fluids is allowed, containers of cryogenic fluids shall not be located within an area surrounded by a dike and containing other hazardous materials and shall be in accordance with Sections 5504.3.1 through 5504.3.1.2.3.

AA. Amend Section 5601.1.3 to read as follows:

5601.1.3 Fireworks prohibited. The possession, manufacture, storage, sale, handling and use of fireworks, including without limitation, “Safe and Sane” fireworks, are prohibited.

Exception: Use and handling of fireworks for professional display in accordance with Title 19, California Code of Regulations, Chapter 6 and with a written waiver from the Fire Code Official approving the public display.

5601.1.3.1 Seizure of Fireworks. The fire code official shall have the authority to seize, take and remove fireworks stored, sold, offered for sale, used or handled in violation of the provisions of Title 19, California Code of Regulations, Chapter 6 and California Health and Safety Code, Chapter 9.

BB. Amend Sections 5704.2.9.6 and 5704.2.9.6.1 to read as follows:

5704.2.9.6 Above-ground tanks outside of buildings. Above-ground tanks outside of buildings shall comply with Sections 5704.2.9.6.1 through 5704.2.9.6.3 and Section 2306.2.3.

5704.2.9.6.1 Locations where above-ground tanks are prohibited.

Storage of Class I, Class II, and Class III liquids in unprotected above- ground tanks outside of buildings is prohibited. Tanks containing fuels shall not exceed 8,000 gallons (30 274 L) in individual capacity or 16,000 gallons (60 549 L) in aggregate capacity. Installations with the maximum allowable aggregate capacity shall be separated from other such installations by not less than 100 feet (30 480 mm).

Attachment 1
Council Agenda 11-15-2022 11.A-17
Packet Page 120

CC. Amend Section 5706.2.4.4 to read as follows:

5706.2.4.4 Location where above-ground tanks are prohibited. The storage of Class I liquids in above-ground tanks outside of buildings is prohibited. Class II and III liquids may be stored in approved above-ground containers for the purpose of dispensing only at facilities complying to Section 5706.1 where no sales to the public occur. Above-ground tanks containing Class II and Class III liquids shall not exceed 2,000 gallons.

Plans for the installation of above-ground tanks shall be submitted to the fire code official approval and in conformance with applicable codes and standards. When required, a Conditional Use Permit shall be obtained from the City.

DD. Amend Section 6104.2 to read as follows:

6104.2 Maximum capacity within established limits. The installation of any liquefied petroleum gas tank over 500 gallons (1 892 L) water capacity is prohibited unless approved by the fire code official.

Exception: In particular installations, this capacity limit shall be determined by the fire code official, after consideration of special features such as topographical conditions, nature of occupancy, proximity to buildings, capacity of proposed LP-gas containers, degree of fire protection to be provided and capabilities of the local fire department.

SECTION 3.

The provisions of State Building Standards Code are hereby modified, changed and amended, as provided for in this ordinance, based upon the foregoing recitals and findings. The City Council takes said action because of the public interest in protecting life and preserving public safety and property. Chapters 15.04 and 15.08 of the Pismo Beach Municipal Code are hereby repealed and replaced by new Chapters 15.04 and

15.08 as follows:

Chapter 15.04 GENERAL PROVISIONS

15.04.010 Adoption of construction codes.

Ten documents, each of which are on file in City offices, marked and designated as (1) the 2022 edition of the California Building Code (Volumes 1 and 2) (Part 2 of Title 24 of the California Code of Regulations), (2) the 2022 edition of the California Residential Code (Part 2.5 of Title 24 of the California Code of Regulations), (3) the 2022 edition of the California Electrical Code (Part 3 of Title 24 of the California Code of Regulations), (4) the 2022 edition of the California Mechanical Code (Part 4 of Title 24 of the California Code of Regulations), (5) the Attachment 1
Council Agenda 11-15-2022 11.A-18
Packet Page 121

2022 edition of the California Plumbing Code (Part 5 of Title 24 of the California Code of Regulations), (6) the 2022 edition of California Energy Code (Part 6 of Title 24 of the California Code of Regulations), (7) the 2022 edition of the California Historical Building Code (Part 8 of Title 24 of the California Code of Regulations), (8) the 2022 edition of the California Existing Building Code (Part 10 of Title 24 of the California Code of Regulations), (9) the 2022 edition of the California Green Building Standards Code (Part 11 of Title 24 of the California Code of Regulations, and (10) the 2021 edition of the International Property Maintenance Code published by the International Code Council are hereby adopted, including chapters and sections of the 2021 International Building Code, 2021 International Residential Code, 2021 Uniform Mechanical Code, 2021 Uniform Plumbing Code, and 2020 National Electrical Code not adopted by agencies of the state of California not adopted by agencies of the State of California, and including appendices thereto, as the Building Construction Regulations of the City of Pismo Beach. The provisions of such are hereby referred to, adopted, and made a part hereof as if fully set out in this Chapter except as modified in Chapter 15.08.

15.04.020 Building Official designated.

The Building Official is hereby designated as the building official and code official for the City of Pismo Beach. Where the “authority having jurisdiction” is used in the adopted codes, it shall mean the building official.

15.04.030 Referenced codes and standards.

Where other codes and standards are referred to in the codes adopted in Section

15.04.010, the following shall apply:

A. International Building Code shall mean California Building Code or California Residential Code, as applicable.

B. International Plumbing Code shall mean California Plumbing Code.

C. International Fuel Gas Code shall mean California Plumbing Code.

D. International Mechanical Code shall mean California Mechanical Code.

E. NFPA 70 and National Electrical Code shall mean California Electrical Code.

F. International Residential Code for One- and Two-family Dwellings shall mean California Residential Code.

G. International Fire Code shall mean California Fire Code.

Attachment 1
Council Agenda 11-15-2022 11.A-19
Packet Page 122

H. International Existing Building Code shall mean California Existing Building Code.

I. International Zoning Code shall mean applicable provisions of Chapters 16 and 17 of the City of Pismo Beach Municipal Code.

Chapter 15.08 CONSTRUCTION REGULATIONS

15.08.010 Amendments; California Building Code.

The California Building Code adopted in Section 15.04.010 is modified, amended and/or supplemented as follows:

A. Delete Appendices A, B, D, F, and K, M, N, O.

B. Amend Section 101.1 to read as follows:

101.1 Title. These regulations shall be known as the California Building Code, hereinafter referred to as “this code.”

C. Amend Section 101.4 to read as follows:

101.4 Referenced codes. The other codes listed in Sections 101.4.1 through 101.4.8 and referenced elsewhere in this code shall be considered part of the requirements of this code to the prescribed extent of each reference.

D. Add Section 101.4.8 to read as follows:

101.4.8 Electrical. The provisions of the California Electrical Code shall apply to the installation of electrical systems, including alterations, repairs, and replacement of electrical equipment, appliances, fixtures, fittings and appurtenances thereto.

E. Amend 103.1 to read as follows:

103.1 Creation of enforcement agency. The Building Division is hereby created and the official in charge thereof shall be known as the building official.

F. Add Section 104.3.1 to read as follows:

104.3.1 Citations. The building official, or duly authorized agent, is granted the authority as provided in Section 836.5(a) of the California Penal Code to issue citations for violations of this chapter.

Attachment 1
Council Agenda 11-15-2022 11.A-20
Packet Page 123

G. Add Section 104.12 to read as follows:

104.12 Discovery of archaeological resources. In the event archaeological resources are unearthed or discovered during any construction activities, the building official shall be notified so that the extent and location of discovered materials may be recorded by a qualified archaeologist and/or Native American, and disposition of artifacts may be accomplished in accordance with applicable laws and ordinances. If discovered archaeological resources are found to include human remains, or in any other case when human remains are discovered during construction, the building official shall notify the county coroner. If human remains are found to be of an ancient age and of archaeological and spiritual significance, the building official shall notify the Native American Heritage Commission.

H. Amend Section 105.2, Building exemptions only, to read as follows:

105.2 Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following:

Building:

1. One-story detached accessory structures used as tool and storage shed, playhouses and similar uses, provided the floor area is not greater than 120 square feet (11 m2).

2. Fences not over 6 feet (1829 mm) high.

3. Oil derricks.

4. Retaining walls and non-retaining walls, including masonry and concrete free-standing walls, that are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or IIIA liquids.

5. Water tanks supported directly on grade if the capacity is not greater than 5,000 gallons (18 925 L) and the ratio of height to diameter or width is not greater than 2:1.

6. Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade, and not over any basement or story below and are not part of an accessible route.

7. Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work.

8. Temporary motion picture, television and theater stage sets and scenery.

Attachment 1
Council Agenda 11-15-2022 11.A-21
Packet Page 124

9. Prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches (610 mm) deep, are not greater than 5,000 gallons (18 925 L) and are installed entirely above ground.

10. Shade cloth structures constructed for nursery or agriculture purposes, not including service systems.

11. Swings and other playground equipment accessory to detached one- and two-family dwellings.

12. Window awnings in Group R-3 and U occupancies, supported by an exterior wall that do not project more than 54 inches (1372 mm) from the exterior wall and do not require additional support.

13. Non-fixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches in height.

I. Amend Section 105.3.2 to read as follows:

105.3.2 Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 365 days after the date of filing, unless a permit has been issued; except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 90 days each. No extension of time granted by the building official shall extend the application beyond the effective date of the next edition of the triennial California Building Standards Code. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.

J. Add Section 109.2.1 to read as follows:

109.2.1 Plan review fees. When submittal documents are required by Section 107.1, a plan review fee shall be paid at the time of submitting the submittal documents for plan review. Said plan review fee shall be in accordance with the schedule as established by the applicable governing body.

Separate plan review fees shall apply to permits for retaining walls and major drainage structures in conjunction with grading. For excavation and fill on the same site, the plan review fee for grading shall be based on the volume of excavation or fill, whichever is greater.

The plan review fees specified in this section are separate fees from the permit fees specified in Section 109.2 and are in addition to the permit fees.

Where submittal documents are incomplete or changed so as to require additional plan review, or where the project involves deferred submittal items as defined in Section 107.3.4.1, an additional plan review fee may be charged at a rate established by the applicable governing authority.

Attachment 1
Council Agenda 11-15-2022 11.A-22
Packet Page 125

K. Amend Section 109.4 to read as follows:

109.4 Work commencing before permit issuance.

109.4.1 Investigation. Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.

109.4.2 Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law.

L. Delete the exception to Section 110.3.5.

M. Add Section 112.4 to read as follows:

112.4 Underground utility services. All new electric, telephone, television, and other communication service connections, for all new, altered, or enlarged buildings shall be provided by underground wiring. Extension of electric or communication distribution lines to serve such projects shall be underground wiring.

Exceptions:

1. Replacement or relocation of electric service equipment served by existing overhead wiring.

2. Where determined by the building official to be impractical or infeasible within the standards and practices of the utility or other companies providing such services.

Where the utility or other company’s distribution system is underground, the service lines shall terminate at a connection point designated by the utility company. Where the utility or other company’s distribution is overhead, the service lines shall terminate as a pole riser on a pole designated by the utility company.

N. Amend Chapter 113 to read as follows:

113.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the building official relative to the application and interpretations of the California Building Standards Code and the International Property Maintenance Code, there shall be and is hereby created a Board of Appeals. Said Board shall also serve as the Housing Attachment 1
Council Agenda 11-15-2022 11.A-23
Packet Page 126

Appeals Board and the Local Appeals Board referenced in the California Building Standards Code. The building official shall be an ex officio member and shall act as secretary to said board but shall have no vote upon any matter before the board. The Board of Appeals shall be appointed on an “as needed” basis by the City Council and shall hold office at its pleasure. The board shall adopt rules of procedure for conducting its business. The fee for appeals shall be consistent with fees established by the applicable governing authority.

113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of the California Building Standards Code or the rules legally adopted hereunder have been incorrectly interpreted, the provisions of the California Building Standards Code do not fully apply or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of the adopted codes. For appeals relating to accommodations for the disabled, the authority of the board shall include the ability to authorize reasonable alternatives to disabled access requirements imposed by the California Building Standards Code.

113.3 Qualifications. The board of appeals shall consist of five members who are qualified by experience and training to pass on matters pertaining to building construction and building service equipment and are not employees of the jurisdiction. For matters subject to the appeal process referenced in Section 1.9.1.5 of the California Building Code regarding accommodations for persons with physical disabilities, the board of appeals shall consist of two members experienced in construction, two members that are persons with disabilities as defined in the California Building Code, and one public member.

O. Amend Section 114.1 to read as follows:

114.1 Unlawful acts. It shall be unlawful for any person, firm or corporation to erect, construct, alter, extend, repair, move, remove, demolish or occupy any building, structure or equipment regulated by this code, or cause same to be done, in conflict with or in violation of any of the provisions of this code.

It shall be unlawful for any person, firm or corporation to use for habitation, storage or any structural purpose, any discarded, salvaged, abandoned or replaced travel trailer, trucking trailer, cargo container, streetcar, bus body, rail car or other vehicle body. It shall be unlawful for any person, firm or corporation to use a travel trailer or recreational vehicle for residential purposes, except in an approved campground or recreational vehicle park.

P. Amend Section 114.4 to read as follows:

114.4 Violation penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, Attachment 1
Council Agenda 11-15-2022 11.A-24
Packet Page 127

constructs, alters, or repairs a building or structure in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provisions of this code and from which no appeal has been taken, or who shall fail to comply with such an order as affirmed or modified by the board of appeals within the time fixed herein, shall be guilty of a misdemeanor, and is subject to the penalty as provided for in Chapter 1.20 of the City of Pismo Beach Municipal Code. The imposition of one penalty for any violation shall not excuse the violation or permit it to continue. All such persons shall be required to correct or remedy such violations or defects within a reasonable time and, when not otherwise specified, each day that prohibited conditions are maintained shall constitute a separate offense. The application of the above penalty shall not be held to prevent the enforced removal of prohibited conditions.

Q. Amend Section 115.3 to read as follows:

115.3 Failure to comply. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to the penalties and code enforcement procedures set forth in Chapters 1.20, 1.24 and 1.28 of the City of Pismo Beach Municipal Code.

R. Amend Section 116.1 to read as follows:

116.1 Conditions. Structures or existing equipment that are or hereafter become unsafe, unsanitary or deficient because of inadequate means of egress facilities, inadequate light and ventilation, or which constitute a fire hazard, or are otherwise dangerous to human life or public welfare, or that involve illegal or improper occupancy or inadequate maintenance, shall be deemed an unsafe condition. Unsafe structures shall be taken down and removed or made safe, as the building official deems necessary and as provided for in this section and the 2021 edition of the International Property Maintenance Code, as adopted. A vacant structure that is not secured against entry shall be deemed unsafe.

S. Amend Section 502 to read as follows:

502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in apposition that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Numbers shall not be spelled out. Address numbers shall be Arabic numbers or alphabetical letters. Each character shall be not less than 6 inches (152.4 mm) high for residential buildings and 8 inches (203.2 mm) for non-residential buildings, with a minimum stroke of 0.5 inch (12.7 mm), unless otherwise required to be greater in height or of reflective material as Attachment 1
Council Agenda 11-15-2022 11.A-25
Packet Page 128

determined by the fire code official during the jurisdiction’s development review process for a specific project. Where required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole other sign or means shall be used to identify the structure. Address identification shall be maintained.

T. Delete Sections 903.2 through 903.2.11.3. Add new Sections 903.2 and 903.2.1 through 903.2.11.3 to read as follows:

903.2 Where required. An approved automatic fire sprinkler system shall be installed:

1. Throughout new buildings.

Exceptions:

1. A single-story building that contains any occupancy other than Group R, H or I where floor area does not exceed
1000 square feet (92.9 m2).

2. A building containing a Group R, Division 3 occupancy not more than three stories above grade plane in height shall comply with the automatic fire sprinkler system
requirements of Section R313 of the California Residential Code.

3. A building that contains only a Group A, Division 5
occupancy. Notwithstanding the foregoing exception,
concession stands, retail areas, press boxes and other
accessory use areas in excess of 1,000 square feet (93
m2) shall be provided with an automatic fire sprinkler
system.

2. Throughout existing and new sections of an existing building where floor area is increased by 1000 square feet (92 m2) or where the floor area of a room or rooms altered exceeds fifty (50) percent of the existing building floor area. Increase in floor area and area of alterations shall be cumulative from January 1, 2008, with each issuance of a building permit, regardless of any change of ownership.

Exceptions:

1. Alterations limited to replacement of exterior coverings, windows, roofing, electrical services, sewer laterals,
retaining walls, and routine plumbing, electrical and
mechanical repairs.

2. A building containing a Group R, Division 3 occupancy not more than three stories above grade plane in height shall Attachment 1
Council Agenda 11-15-2022 11.A-26
Packet Page 129

comply with the automatic fire sprinkler system
requirements of Section R313 of the California Residential Code.

3. Throughout existing and new sections of an existing building where an additional story is added.

Exception: A building that contains a Group R, Division 3 occupancy that will not be more than three stories above grade plane in height shall comply with the automatic fire sprinkler system requirements of Section R313 of the
California Residential Code.

4. In additions to existing buildings equipped with an automatic fire sprinkler system.

5. Throughout existing and new sections of an existing building where there is an occupancy classification change resulting in a higher hazard as determined by Table 903.2(5).

Table 903.2(5)
Hazard Categories

6. In buildings, or portions thereof, where cellulose nitrate film or pyroxylin plastics are manufactured, stored or handled.

For the purpose of requiring the automatic fire sprinkler systems specified in this chapter, the floor area within the surrounding exterior walls shall be considered as one building. For the purpose of calculating square footage for the application of fire sprinkler requirements and fire flow requirements, the floor area shall be as defined by Floor Area Gross in Section 202 of this code.

903.2.1 through 903.2.11.3 not used. Text continues with Section 903.2.11.4.

Relative Hazard Occupancy Classifications
1 (Highest Hazard) H
2 I-2, I-3, I-4
3 A, E, I-1, M, R-1, R-2, R-4
4 B, F-1, R-3, S-1
5 (Lowest Hazard) F-2, S-2, U
Attachment 1
Council Agenda 11-15-2022 11.A-27
Packet Page 130

U. Add Section 903.3.5.3 to read:

903.3.5.3 Minimum water supply. The minimum water supply for an automatic residential fire sprinkler system designed in accordance with Section R313 of the California Residential Code or NFPA 13D shall be not less than a 1-inch nominal pipe size for the service lateral from the water main to the water meter location and not less than a 1-inch water meter.

V. Add Section 903.3.10 to read as follows:

903.3.10 Exterior locations. Automatic fire sprinklers installed at exterior locations shall be approved corrosion-resistant devices.

W. Amend Section 905.3.1, with all Exceptions to remain unmodified, to read as follows:

905.3.1 Building height and area. In other than Group R-3 and R-3.1 occupancies, Class III standpipe systems shall be installed throughout each floor where any of the following occur:

1. Buildings where the floor level of the highest story is located more than 30 feet (9144 mm) above the lowest level of the fire department vehicle access.

2. Buildings where the floor level of the lowest story is located more than 30 feet (9144 mm) below the highest level of fire department vehicle access.

3. Buildings that are two or more stories below the highest level of fire department vehicle access.

4. A parking structure.

A building that is greater than 20,000 square feet (1.858 m2) of floor area and greater than 18 feet (5.49 m) in height shall have a dry or wet standpipe system with a 2-½ inch (64 mm) outlet at the roof near the roof access.

Location of the outlet and the fire department connection to the standpipe shall be labeled and approved by the fire code official.

X. Amend Section 907.6.6 to read as follows:

907.6.6 Monitoring. Fire alarm systems required by this chapter or by the California Fire Code shall be monitored by an approved central station service listed by Underwriters Laboratory for receiving fire alarms in accordance with NFPA 72 and this section. The central station shall contact Attachment 1
Council Agenda 11-15-2022 11.A-28
Packet Page 131

and notify the police/fire dispatch center immediately on notification of an alarm and prior to making contact with the protected premises.

Exception: Monitoring by a central station is not required for:

1. Single- and multiple-station smoke alarms required by Section 907.2.10.

2. Group I-3 occupancies shall be monitored in accordance with Section 907.2.6.3.

3. Automatic sprinkler systems in one- and two-family dwellings.

Y. Amend Section 1030.1 to read as follows:

1030.1 General. In addition to the means of egress required by this chapter, emergency escape and rescue openings shall be provided in Group R occupancies. Basements and sleeping rooms below the fourth story above grade plane shall not fewer than one exterior emergency escape and rescue opening in accordance with this section. Where basements contain one or more sleeping rooms, emergency escape and rescue openings shall be required in each sleeping room, but hall not be required in adjoining areas of the basement. Such openings shall open directly into a public way or to a yard or court that opens to a public way.

Exceptions:

1. In Groups R-1 and R-2 occupancies constructed of Type I, Type IIA, Type IIIA or Type IV construction equipped throughout with an approved automatic sprinkler system in accordance with Section 903.3.1.1.

2. Group R-2.1 occupancies meeting the requirements for delayed egress in accordance with Section1010.1.9.8 may have operable windows that are breakable in sleeping rooms permanently restricted to a maximum 4-inch open position.

3. Basements with a ceiling height of less than 80 inches (2032 mm) shall not be required to have emergency escape and rescue openings.

4. Emergency escape and rescue openings are not required from basements or sleeping rooms that have an exit door or exit access door that opens directly into a public way or to a yard, court or exterior exit balcony that opens to a public way.

5. Basements without habitable spaces and having not more than 200 square feet (18.6 m2) in floor area shall not be required to have emergency escape and rescue openings.

6. In Group R-2.2 occupancies a certified fire escape is acceptable as a secondary means of egress for existing buildings for this section of the code.

Attachment 1
Council Agenda 11-15-2022 11.A-29
Packet Page 132

Z. Add Section 1506.4 to read as follows:

1506.4 Wood shake and shingle roof covering limitations. Wood shake or shingle roof coverings shall not be installed on any building. A roof covering shall not be applied over existing wood shakes or shingles.

Exception: A wood shake or wood shingle system listed as a Class A-rated roof covering.

AA. Amend Section 3201.1 to read as follows:

3201.1 Scope. The provisions of this chapter and Chapter 12.32 of the Municipal Code shall govern encroachment of structures into the public right-of-way.

BB. Amend Section 3201.3 to read as follows:

3201.3 Other laws. The provisions of this chapter shall not be construed to permit violation of other laws or ordinances regulating the use and occupancy of public property. The projection of any structure or portion thereof into a right-of-way shall be subject to an encroachment permit issued by the City of Pismo Beach, State of California, or other agency having jurisdiction over the public right-of-way.

CC. Amend Section 3201.4 to read as follows:

3201.4 Drainage. Drainage water collected from a roof, awning, canopy or marquee, and condensate from mechanical equipment shall not flow over a public walking surface unless specifically approved by the City Engineer.

DD. Delete Sections 3202.2.1, 3202.2.2 and 3202.2.3 and amend section 3202.2 to read as follows:

3202.2 Encroachments above grade and below 8 feet in height.

Encroachments into the public right-of-way above grade and below 8 feet (2438 mm) in height shall be prohibited. Doors, windows and stairs shall not open or project into the public right-of-way.

EE. Amend Section 3202.3.1 to read as follows:

3202.3.1 Awnings, canopies, marquees, roof overhangs, roof projections, and signs. Awnings, canopies, marquees, roof overhangs, roof projections, and signs shall be constructed so as to support applicable loads as specified in Chapter 16. Roof overhangs or projections shall not be used for human occupancy. Awnings, canopies, marquees, roof overhangs, roof projections and signs with less than 15 feet (4572 mm) Attachment 1
Council Agenda 11-15-2022 11.A-30
Packet Page 133

clearance above the sidewalk shall not extend into or occupy more than two-thirds the width of the sidewalk measured from the building to the face of curb. Stanchions or columns that support awnings, canopies, marquees, and signs shall not be located on the public right-of-way.

FF. Add Exception to Section 3202.3.2 to read as follows:

3202.3.2 Windows, architectural features and mechanical equipment.

Where the vertical clearance above grade to projecting windows, architectural features or mechanical equipment is more than 8 feet (2438 mm), 1 inch (25 mm) of encroachment is permitted for each additional 1 inch of clearance above 8 feet (2438 mm), but the maximum encroachment shall be 4 feet (11219 mm).

Exception: For windows and architectural features projecting over a public sidewalk, the minimum vertical clearance may be 8 feet (2438 mm) for the maximum encroachment length of 4 feet (11219 mm) and the maximum projection shall be not less than 2 feet (610 mm) from the face of curb.

GG. Amend Appendix Section G104.1 to read as follows:

G104.1 Permit application and processing. Any person, owner, or owner’s authorized agent who intends to conduct any development in a flood hazard area shall first make application to the building official and shall obtain the required permit. The processing and administration of a permit application shall be as prescribed in Sections 105 and 107.

HH. Amend Appendix Section H101.2 to read as follows:

H101.2 Signs exempt from permits. The following signs are exempt from the requirement to obtain a permit from the building official before erection or alteration of a sign:

1. Signs where a Planning Permit is not required.

2. Temporary signs announcing the sale or rent of property.

3. Signs erected by transportation authorities.

II. Add Appendix Section H106.3 to read as follows:

H106.3 Sign Operation. Illuminated signs shall remain off pending final inspection approval.

Attachment 1
Council Agenda 11-15-2022 11.A-31
Packet Page 134

JJ. Add Appendix Sections J101.3 and J101.4 to read as follows:

J101.3 Hillsides. The term hillside area is defined as all properties with slopes of 10 percent or more. No grading shall commence on slopes greater than 30 percent, including but not limited to access roads and driveways unless approved by the Planning Commission or the City Council. The hillside development regulations of the city zoning ordinance and General Plan/Local Coastal Plan Policy C0-10 shall apply in addition to the standards and procedures set forth in this code for all properties in this category.

J101.4 Approval for building construction. Prior to commencement of any building construction, pursuant to a building permit for the graded site, a benchmark shall be provided to verify that the building site is graded in conformance with the approved grading plan. No building construction shall be started until the building official or city engineer has verified that the rough grading conforms to the approved plan, including any interim or permanent erosion control measures deemed necessary.

KK. Amend Appendix Section J103.2 and add Appendix Sections J103.3 and J103.4 to read as follows:

J103.2 Exempted work. A grading permit shall not be required for the following:

1. Grading in an isolated, self-contained area, provided there is no danger to the public, and that such grading will not adversely affect adjoining properties.

2. Excavation for construction of a structure permitted under this code.

3. Cemetery graves.

4. Refuse disposal sites controlled by other regulations.

5. Excavations for wells, or trenches for utilities.

6. Mining, quarrying, excavating, processing, or stockpiling of rock, sand, gravel, aggregate, or clay controlled by other regulations, provided such operations do not affect the lateral support of, or significantly increase stresses in, soil on adjoining properties.

7. Exploratory excavations performed under the direction of a registered design professional.

8. An excavation which does not exceed fifty cubic yards and (1) is less than 2 feet (610 mm) in depth or (2) does not create a cut slope greater than 5 feet (1524 mm) in height and steeper than 1 unit vertical to 2 units horizontal.

9. A fill less than 1 foot (305 mm) in depth and placed on natural terrain with a slope flatter than 1 unit vertical to 5 units horizontal, not intended to support structures, on any one lot and does not obstruct a drainage course.

Attachment 1
Council Agenda 11-15-2022 11.A-32
Packet Page 135

10. A fill less than 3 foot (38.3 mm) in depth and placed on natural terrain with a slope flatter than 1 unit vertical to 5 units horizontal, not intended to support structures, that does not exceed 50 cubic yards (38.3 m3) on any one lot and does not obstruct a drainage course.

Exemption from the permit requirements of this appendix shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction.

J103.3 Early grading. A grading permit shall not be issued prior to issuance of a building permit for the project unless:

1. Approval of a tentative subdivision or tract map, use permit, planning permit or similar authorization has been granted; and

2. Related street and utility grades have been established and approved; and

3. A surety bond in accordance with Section J103.4 is deposited to guarantee restoration of the site to a natural or other condition acceptable to the building official should the project not proceed to completion.

J103.4 Bonds. The building official may require bonds in such form and amounts as may be deemed necessary to ensure that the work, if not completed in accordance with the approved plans and specifications, will be corrected to eliminate hazardous conditions or restore a graded site to the original condition. In lieu of a surety bond, the applicant may file a cash bond or instrument of credit with the building official in an amount equal to that which would be required in the surety bond.

The city engineer may require that bonds be posted to recover the full costs of any damage to public right-of-way which may occur because of the peculiar nature or large scope of the project, such as transportation of fill or heavy equipment on local streets not designed to accommodate the traffic.

LL. Amend Appendix Section J104.2 to read as follows:

J104.2 Site plan requirements. In addition to the provisions of Section 107, a grading plan shall show the existing grade and finished grade in contour intervals of sufficient clarity to indicate the nature and extent of the work and show in detail that it complies with the requirements of this code.

The plans shall show the existing grade on adjoining properties in sufficient detail to identify how grade changes will conform to the requirements of this code. The plans shall show existing drainage conditions and drainage devices and all proposed changes thereto. The plans shall include the location and dimension of all trees on the site to remain and to be removed Attachment 1
Council Agenda 11-15-2022 11.A-33
Packet Page 136

which are 3 inches (76.2 mm) in diameter or larger at the trunk, measured at 4.5 feet (1.37 m) above ground level. A preservation plan shall be submitted for all trees to remain. The plans shall indicate where excess material, rocks, or rubble will be disposed of.

MM. Add Appendix Section J110.3 to read as follows:

J110.3 Other standards. Erosion control measures shall conform to the following standards and approval processes:

1. The City of Pismo Beach Storm Water Management Plan.

2. The most current “Erosion and Sediment Control Field Manual” published by the California Regional Water Quality Control Board, San Francisco Bay Region.

3. NPDES permit requirements.

4. The 2022 California Green Building Standards Code.

15.08.020 Amendments; California Residential Code.

The California Residential Code adopted in Section 15.04.010 is modified, amended and/or supplemented as follows:

A. Delete Appendices A, B, C, D, E, F, G, I, J, K, L, M, N, O, P, Q, R, T, U, and W.

B. Amend Section R101.1 to read as follows:

R101.1 Title. These provisions shall be known as the California Residential Code and shall be cited as such and shall be referred to herein as “this code”.

C. Amend Section R103.1 to read as follows:

R103.1 Creation of enforcement agency. The Building Division is hereby created and the official in charge thereof shall be known as the building official.

D. Add Section R104.3.1 to read as follows:

R104.3.1 Citations. The building official, or duly authorized agent, is granted the authority as provided in Section 836.5(a) of the California Penal Code to issue citations for violations of this chapter.

Attachment 1
Council Agenda 11-15-2022 11.A-34
Packet Page 137

E. Add Section R104.12 to read as follows:

R104.12 Discovery of archaeological resources. In the event archaeological resources are unearthed or discovered during any construction activities, the building official shall be notified so that the extent and location of discovered materials may be recorded by a qualified archaeologist and/or Native American, and disposition of artifacts may be accomplished in accordance with applicable laws and ordinances. If discovered archaeological resources are found to include human remains, or in any other case when human remains are discovered during construction, the building official shall notify the county coroner. If human remains are found to be of an ancient age and of archaeological and spiritual significance, the building official shall notify the Native American Heritage Commission.

F. Amend Section R105.2 and the Building exemptions only to read as follows:

R105.2 Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following:

Building:

1. One-story detached accessory structures, provided the floor area does not exceed 120 square feet (11.15 m2).

2. Fences not over 6 feet (1829 mm) high.

3. Retaining walls and non-retaining walls, including masonry and concrete free-standing walls, that are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge.

4. Water tanks supported directly on grade if the capacity does not exceed 5,000 gallons (18 927 L) and the ratio of height to diameter or width does not exceed 2 to 1.

5. Sidewalks and driveways.

6. Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work.

7. Prefabricated swimming pools that are less than 24 inches (610 mm) deep.

8. Swings and playground equipment.

9. Window awnings supported by an exterior wall which do not project more than 54 inches (1372 mm) from the exterior wall and do not require additional support.

10. Decks not attached to a dwelling and not more than 30 inches (762 mm) above grade at any point.

Attachment 1
Council Agenda 11-15-2022 11.A-35
Packet Page 138

G. Amend Section R105.3.2 to read as follows:

R105.3.2 Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 365 days after the date of filing, unless a permit has been issued; except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 90 days each. No extension of time granted by the building official shall extend the application beyond the effective date of the next edition of the triennial California Building Standards Code. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.

H. Add Section R108.2.1 to read as follows:

R108.2.1 Plan review fees. When submittal documents are required by Section R106.1, a plan review fee shall be paid at the time of submitting the submittal documents for plan review. Said plan review fee shall be in accordance with the schedule as established by the applicable governing body.

Separate plan review fees shall apply to permits for retaining walls and major drainage structures in conjunction with grading. For excavation and fill on the same site, the plan review fee for grading shall be based on the volume of excavation or fill, whichever is greater.

The plan review fees specified in this section are separate fees from the permit fees specified in Section R108.2 and are in addition to the permit fees.

Where submittal documents are incomplete or changed so as to require additional plan review, an additional plan review fee may be charged at a rate established by the applicable governing authority.

I. Amend Section R108.6 to read as follows:

R108.6 Work commencing before permit issuance.

R108.6.1 Investigation. Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.

R108.6.2 Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The payment of such investigation fee shall not exempt any Attachment 1
Council Agenda 11-15-2022 11.A-36
Packet Page 139

person from compliance with all other provisions of this code nor from any penalty prescribed by law.

J. Add Section R111.4 to read as follows:

R111.4 Underground utility services. All new electric, telephone, television, and other communication service connections, for all new, altered, or enlarged buildings shall be provided by underground wiring.

Extension of electric or communication distribution lines to serve such projects shall be underground wiring.

Exceptions:

1. Replacement or relocation of electric service equipment served by existing overhead wiring.

2. Where determined by the building official to be impractical or infeasible within the standards and practices of the utility or other companies providing such services.

Where the utility or other company's distribution system is underground, the service lines shall terminate at a connection point designated by the utility company. Where the utility or other company's distribution is overhead, the service lines shall terminate as a pole riser on a pole designated by the utility company.

K. Amend Section R112.1 to read as follows and delete Sections R112.2 through R112.4:

R112.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the building official relative to the application and interpretation of this code, the provisions of Section 113 of the California Building Code, as amended, shall apply.

L. Amend Section R113.1 to read as follows:

R113.1 Unlawful acts. It shall be unlawful for any person, firm or corporation to erect, construct, alter, extend, repair, move, remove, demolish or occupy any building, structure or equipment regulated by this code, or cause same to be done, in conflict with or in violation of any of the provisions of this code. It shall be unlawful for any person, firm or corporation to use for habitation, storage or any structural purpose, any discarded, salvaged, abandoned or replaced travel trailer, trucking trailer, cargo container, streetcar, bus body, rail car or other vehicle body. It shall be unlawful for any person, firm or corporation to use a travel trailer or recreational vehicle for residential purposes, except in an approved campground or recreational vehicle park.

Attachment 1
Council Agenda 11-15-2022 11.A-37
Packet Page 140

M. Amend Section R113.4 to read as follows:

R113.4 Violation penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, alters, or repairs a building or structure in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provisions of this code and from which no appeal has been taken, or who shall fail to comply with such an order as affirmed or modified by the board of appeals within the time fixed herein, shall be guilty of a misdemeanor, and is subject to the penalty as provided for in Chapter 1.20 of the City of Pismo Beach Municipal Code. The imposition of one penalty for any violation shall not excuse the violation or permit it to continue. All such persons shall be required to correct or remedy such violations or defects within a reasonable time and, when not otherwise specified, each day that prohibited conditions are maintained shall constitute a separate offense. The application of the above penalty shall not be held to prevent the enforced removal of prohibited conditions.

N. Amend Section R114.2 to read as follows:

R114.2 Failure to comply. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to the penalties and code enforcement procedures set forth in Chapters 1.20, 1.24 and 1.28 of the City of Pismo Beach Municipal Code.

O. Amend Section R310.1 by deletion of Exception 2.

R310.1 Emergency escape and rescue opening required. Basements, habitable attics and every sleeping room shall have not less than one operable emergency escape and rescue opening. Where basements contain one or more sleeping rooms, an emergency escape and rescue opening shall be required in each sleeping room. Emergency escape and rescue openings shall open directly into a public way, or to a yard or court that opens to a public way.

Exception: Storm shelters and basements used only to house mechanical equipment not exceeding a total floor area of 200 square feet (18.58 m2).

P. Add Section R312.1.5 to read as follows:

R312.1.5 Glazing. Where glass is used to provide a guard or as a portion of the guard system, the guard shall also comply with Section 2407 of the California Building Code. Where the glazing provided does not meet the strength and attachment requirements of Section 1607.8 of the California Attachment 1
Council Agenda 11-15-2022 11.A-38
Packet Page 141

Building Code, complying guards shall also be located along glazed sides of open-sided walking surfaces.

Q. Amend Section R313.2 to read as follows:

R313.2 One- and two-family dwellings automatic fire systems. An automatic residential fire sprinkler system shall be installed in one- and two- family dwellings.

Exceptions:

1. Existing dwellings, not already provided with an automatic residential fire sprinkler system, where additions or alterations do not increase the existing floor area by more than 1,000 square feet (92.9 m2) or create an additional dwelling unit.

2. Accessory Dwelling Unit, provided that all of the following are met:

2.1 The unit meets the definition of an Accessory Dwelling unit as defined in the Government Code Section 65852.2.

2.2 The existing primary residence does not have automatic fire sprinklers.

2.3 The accessory detached building does not exceed 1,200 square feet (111.5 m2) in size.

2.4 The unit is on the same lot as the primary residence.

R. Amend Section R313.3.1.2 to read as follows:

R313.3.1.2 Required sprinkler locations. Sprinklers shall be installed to protect all areas of a dwelling unit.

Exceptions:

1. Attics, crawl spaces and normally unoccupied concealed spaces that do not contain fuel-fired appliances do not require fire sprinklers. In attics, crawl spaces and normally unoccupied concealed spaces that contain fuel-fired equipment, a sprinkler shall be installed above the equipment; however, sprinklers shall not be required in the remainder of the space.

2. Clothes closets, linen closets and pantries not exceeding 24 square feet (2.2 m2) in area, with the smallest dimension not greater than 3 feet (915 mm) and having wall and ceiling surfaces of gypsum board.

3. Bathrooms not more than 55 square feet (5.1 m2) in area.

4. Detached garages where the floor area does not exceed 1000 square feet (92.9 m2); carports with no habitable space above; open attached porches; unheated entry areas, such as mud rooms, that are adjacent to an exterior door; and similar areas.

Attachment 1
Council Agenda 11-15-2022 11.A-39
Packet Page 142

S. Add Section R313.3.5.4 to read:

R313.3.5.4 Minimum water supply. The minimum water supply for an automatic residential fire sprinkler system designed in accordance with Section R313 or NFPA 13D shall be not less than a 1-inch nominal pipe size for the service lateral from the water main to the water meter location and not less than a 1-inch water meter.

T. Amend Section R319.1 to read as follows:

R319.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in apposition that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Numbers shall not be spelled out. Address numbers shall be Arabic numbers or alphabetical letters. Each character shall be not less than 6 inches (152.4 mm) high with a minimum stroke of 0.5 inch (12.7 mm), unless otherwise required to be greater in height or of reflective material as determined by the fire code official during the jurisdiction’s development review process for a specific project. Where required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole other sign or means shall be used to identify the structure.

Address identification shall be maintained.

U. Add Section R326.1 to read as follows:

R326.1 General. The design and construction of pools and spas shall comply with the California Building Code and Appendix V of this code.

V. Add Section R904.5 to read as follows:

R904.5 Wood shake and shingle roof covering limitations. Wood shake or shingle roof coverings shall not be installed on any building. A roof covering shall not be applied over existing wood shakes or shingles.

Exception: A wood shake or wood shingle system listed as a Class A-rated roof covering complying with Section R902.2 of this code.

15.08.030 Amendments; California Existing Building Code.

The California Existing Building Code adopted in Section 15.04.010 is modified, amended and/or supplemented as follows:

A. Delete Appendix Chapter A4.

Attachment 1
Council Agenda 11-15-2022 11.A-40
Packet Page 143

B. Amend Section 101.1 to read as follows:

101.1 Title. These regulations shall be known as the California Existing Building Code, hereinafter referred to as “this code.”

C. Amend 103.1 to read as follows:

103.1 Creation of enforcement agency. The Building Division is hereby created and the official in charge thereof shall be known as the building official. For the purposes of this code, building official shall mean code official.

D. Add Section 104.3.1 to read as follows:

104.3.1 Citations. The code official, or duly authorized agent, is granted the authority as provided in Section 836.5(a) of the California Penal Code to issue citations for violations of this chapter.

E. Add Section 104.12 to read as follows:

104.12 Discovery of archaeological resources. In the event archaeological resources are unearthed or discovered during any construction activities, the building official shall be notified so that the extent and location of discovered materials may be recorded by a qualified archaeologist and/or Native American, and disposition of artifacts may be accomplished in accordance with applicable laws and ordinances. If discovered archaeological resources are found to include human remains, or in any other case when human remains are discovered during construction, the building official shall notify the county coroner. If human remains are found to be of an ancient age and of archaeological and spiritual significance, the building official shall notify the Native American Heritage Commission.

F. Amend Section 105.3.2 to read as follows:

105.3.2 Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 365 days after the date of filing, unless a permit has been issued; except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 90 days each. No extension of time granted by the building official shall extend the application beyond the effective date of the next edition of the triennial California Building Standards Code. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.

Attachment 1
Council Agenda 11-15-2022 11.A-41
Packet Page 144

G. Add Section 108.2.1 to read as follows:

108.2.1 Plan review fees. When submittal documents are required by Section 106.1, a plan review fee shall be paid at the time of submitting the submittal documents for plan review. Said plan review fee shall be in accordance with the schedule as established by the applicable governing body.

Separate plan review fees shall apply to permits for retaining walls and major drainage structures in conjunction with grading. For excavation and fill on the same site, the plan review fee for grading shall be based on the volume of excavation or fill, whichever is greater.

The plan review fees specified in this section are separate fees from the permit fees specified in Section 108.2 and are in addition to the permit fees.

Where submittal documents are incomplete or changed so as to require additional plan review, or where the project involves deferred submittal items as defined in Section 106.3.4, an additional plan review fee may be charged at a rate established by the applicable governing authority.

H. Amend Section 108.4 to read as follows:

108.4 Work commencing before permit issuance.

108.4.1 Investigation. Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.

108.4.2 Fee. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this code. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law.

I. Delete the exception to Section 109.3.5.

J. Add Section 111.4 to read as follows:

111.4 Underground utility services. All new electric, telephone, television, and other communication service connections, for all new, altered, or enlarged buildings shall be provided by underground wiring. Extension of electric or communication distribution lines to serve such projects shall be underground wiring.

Attachment 1
Council Agenda 11-15-2022 11.A-42
Packet Page 145

Exceptions:

1. Replacement or relocation of electric service equipment served by existing overhead wiring.

2. Where determined by the building official to be impractical or infeasible within the standards and practices of the utility or other companies providing such services.

Where the utility or other company's distribution system is underground, the service lines shall terminate at a connection point designated by the utility company. Where the utility or other company's distribution is overhead, the service lines shall terminate as a pole riser on a pole designated by the utility company.

K. Amend Section 112.1 to read as follows and delete Sections 112.2 and 112.3:

112.1 General. In order to hear and decide appeals of orders, decisions or determinations made by the code official relative to the application and interpretation of this code, the provisions of Section 113 of the California Building Code, as amended, shall apply.

L. Amend Section 113.1 to read as follows:

113.1 Unlawful acts. It shall be unlawful for any person, firm or corporation to erect, construct, alter, extend, repair, move, remove, demolish or occupy any building, structure or equipment regulated by this code, or cause same to be done, in conflict with or in violation of any of the provisions of this code.

It shall be unlawful for any person, firm or corporation to use for habitation, storage or any structural purpose, any discarded, salvaged, abandoned or replaced travel trailer, trucking trailer, cargo container, streetcar, bus body, rail car or other vehicle body. It shall be unlawful for any person, firm or corporation to use a travel trailer or recreational vehicle for residential purposes, except in an approved campground or recreational vehicle park.

M. Amend Section 113.4 to read as follows:

113.4 Violation penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, alters, or repairs a building or structure in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provisions of this code and from which no appeal has been taken, or who shall fail to comply with such an order as affirmed or modified by the board of appeals within the time fixed herein, shall be guilty of a misdemeanor, and is subject to the penalty as provided for in Chapter 1.20 of the City of Pismo Beach Municipal Code. The imposition Attachment 1
Council Agenda 11-15-2022 11.A-43
Packet Page 146

of one penalty for any violation shall not excuse the violation or permit it to continue. All such persons shall be required to correct or remedy such violations or defects within a reasonable time and, when not otherwise specified, each day that prohibited conditions are maintained shall constitute a separate offense. The application of the above penalty shall not be held to prevent the enforced removal of prohibited conditions.

N. Amend Section 114.3 to read as follows:

114.3 Failure to comply. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to the penalties and code enforcement procedures set forth in Chapters 1.20, 1.24 and 1.28 of the City of Pismo Beach Municipal Code.

O. Amend Section 115.1 to read as follows:

115.1 Conditions. Structures or existing equipment that are or hereafter become unsafe, unsanitary or deficient because of inadequate means of egress facilities, inadequate light and ventilation, or which constitute a fire hazard, or are otherwise dangerous to human life or public welfare, or that involve illegal or improper occupancy or inadequate maintenance, shall be deemed an unsafe condition. Unsafe structures shall be taken down and removed or made safe, as the building official deems necessary and as provided for in this section and the 2021 edition of the International Property Maintenance Code, as adopted. A vacant structure that is not secured against entry shall be deemed unsafe.

P. Amend Section A102.1 to read as follows:

A102.1 General. The provisions of this chapter shall apply to all existing buildings having at least one unreinforced masonry bearing wall. The elements regulated by this chapter shall be determined in accordance with Table A102.1. Except as provided herein, other structural provisions of the building code shall apply. This chapter does not apply to the alteration of existing electrical, plumbing, mechanical or fire safety systems.

Exceptions:

1. Warehouses or similar structures not used for human habitation unless housing emergency equipment or supplies.

2. A building having five living units or less.

3. A building previously strengthened to standards in effect at the time of strengthening.

Attachment 1
Council Agenda 11-15-2022 11.A-44
Packet Page 147

Q. Add new Appendix Section A115 entitled "Administrative Provisions" to read as follows:

SECTION A115 ADMINISTRATIVE PROVISIONS

A115.1 Compliance requirements previously established (Ordinance 2010-008). The city’s building stock and records were surveyed to identify buildings within the scope of this chapter, and said building owners were notified of the determination by notice and order sent by certified mail on dated January 11, 1990. The owner of a building within the scope of this chapter shall cause a structural analysis of the building to be made either by California-licensed engineer or architect. The engineer or architect may provide sufficient evidence to establish that the building is not within the scope of this chapter. The structural analysis shall be subject to the approval of the building official and shall be submitted in accordance with the following time limits:

1. By no later than February 1, 2011, a structural analysis and other substantial evidence which demonstrates that the building is not within the scope of this chapter shall be submitted.

2. By no later than February 1, 2011, a structural analysis and plans for alterations required to conform to this chapter shall be submitted.

3. By August 1, 2011, permits for the seismic retrofitting work necessary to achieve conformance with this chapter shall be obtained.

Where compliance with this chapter would displace low- and moderate- income residential uses, the building official may extend special and reasonable consideration to the time limits in this section so as to minimize the displacement of persons.

In order for an owner of a building within the scope of this chapter to comply with this chapter, the following elements shall be made to comply:

1. Unreinforced masonry walls to resist normal and in-plane seismic forces.

2. The anchorage and stability of exterior parapets and ornamentation.

3. The anchorage of unreinforced masonry walls to floors and roof.

4. Floor and roof diaphragms.

5. A complete bracing system to resist earthquake forces.

A115.1.1 Subsequent determinations. Where a building, not otherwise identified in the original inventory of buildings subject to Ordinance 2010- 08, is determined to be within the scope of this chapter, the owner shall structurally alter the building to comply with this chapter within 180 days of receipt of a notice and order, or as otherwise determined by the building official.

Attachment 1
Council Agenda 11-15-2022 11.A-45
Packet Page 148

A115.2 Notice and order.

A115.2.1 General. The building official shall, within 30 days of the determination that a building is of unreinforced masonry construction issue a notice and order as provided in this section to the owner of a building within the scope of this chapter.

A115.2.2 Service of notice and order. A notice or order issued pursuant to this section shall be in writing and shall be served either personally or by certified or registered mail upon the owner as shown on the last equalized assessment roll, and upon the person, if any, in apparent charge or control of the building. The failure of any such person to receive such notice or order shall not affect the validity of any proceedings taken under this chapter or relieve any such person from any duty or obligation imposed on him by the provisions of this chapter.

A115.2.3 Content of notice and order. The notice shall specify that the building has been determined by the building official to be within the scope of this chapter and, therefore, is subject to the minimum seismic standards of this chapter. The order shall direct the owner to obtain a building or demolition permit as required by this chapter and cause the building to be structurally altered to conform to the provisions of this chapter, or cause the building to be demolished. The notice or order shall be accompanied by a copy of Section A115.1 of this code, which sets forth the owner's responsibilities.

A115.3 Appeal. The owner of the building may appeal the building official's initial determination that the building is within the scope of this chapter to the Board of Appeals established by Section 113 of the California Building Code, as adopted. Such appeal shall be filed with the Board within 60 days from the service date of the order described in Section A115.2. Any appeal shall be decided by the Board no later than 90 days after filing and the grounds thereof shall be stated clearly and concisely. Appeals or requests for modifications from any other determinations, orders or actions by the building official pursuant to this chapter shall be made in accordance with the procedures established in Section 104.10 of the California Building Code.

A115.4 Recordation. At the time that the building official serves the aforementioned notice, the building official shall also file and record with the office of the county recorder a certificate stating that the subject building is within the scope of this chapter and is a potentially earthquake hazardous building. The certificate shall also state that the owner thereof will be ordered to structurally analyze the building to determine compliance with this chapter.

Attachment 1
Council Agenda 11-15-2022 11.A-46
Packet Page 149

If the building is either demolished, found not to be within the scope of this chapter, or is structurally capable of resisting minimum seismic forces required by this chapter as a result of structural alterations or an analysis, the building official shall file and record with the office of the county recorder a form terminating the status of the subject building as being classified within the scope of this chapter.

A115.5 Enforcement. If the owner in charge or control of the subject building fails to comply with any order issued by the building official pursuant to this chapter within the time limit set forth in Section A115.1, the building official shall verify that the record owner of this building has been properly served. If the order has been served on the record owner, then the following provisions apply:

1. The building official may order that the entire building be vacated and that the building remain vacated until such order has been complied with. If compliance with such order has not been accomplished within 90 days after the date the building has been ordered vacated or such additional time as may have been granted by the Board of Appeals, the building official may order its demolition in accordance with the provisions of Sections 107, 108, 109 and 110 of the International Property Maintenance Code.

2. Any person who violates any provision of this chapter is guilty of a misdemeanor, and is subject to the penalty as provided for in Chapter

1.20 of the City of Pismo Beach Municipal Code.

15.08.040 Amendments; California Mechanical Code.

The California Mechanical Code adopted in Section 15.04.010 is modified, amended and/or supplemented as follows:

A. Delete Division II of Chapter 1, Table 104.5, and Appendices A, B, C, D, E, F, and G.

B. Administration of the mechanical code shall be as set forth in Division II of Chapter 1 of the California Building Code.

15.08.050 Amendments; California Plumbing Code.

The California Plumbing Code adopted in Section 15.04.010 is modified, amended and/or supplemented as follows:

A. Delete Division II of Chapter 1, Table 104.5, and Appendices C, E, F, G, K and L.

Attachment 1
Council Agenda 11-15-2022 11.A-47
Packet Page 150

B. Administration of the plumbing code shall be as set forth in Division II of Chapter 1 of the California Building Code.

C. Amend Section 1501.3 by deletion of Exception.

D. Amend Section 1503.1.1 to read as follows:

1503.1.1 Clothes washer system. A clothes washer system in compliance with all of the following is not exempt from the construction permit specified in Section 1.8.4.1 and shall not be installed or altered without a construction permit and shall comply with this chapter and the following:

(1) The installation, change, alteration or repair of the system does not include a potable water connection or a pump and does not affect other building, plumbing, electrical, or mechanical components including structural features, egress, fire-life safety, sanitation, potable water supply piping, or accessibility.

Note: The pump in a clothes washer shall not be considered part of the gray water system.

(2) The gray water shall be contained on the site where it is generated.

(3) Gray water shall be directed to and contained within an irrigation or disposal field.

(4) Ponding or runoff is prohibited and shall be considered a nuisance.

(5) Gray water systems shall be designed to minimize contact with humans and domestic pets.

E. Amend Section 1503.7 to read as follows:

1503.7 Drawings and specifications. The Authority Having Jurisdiction may require the following information to be included with or in a plot plan before a permit is issued for a gray water system, or at a time during construction thereof:

(1) Plot plan drawn to scale and completely dimensioned, showing lot lines and structures, direction and approximate slope of surface, location of present or proposed retaining walls, drainage channels, water supply lines, wells, paved areas and structures, number of bedrooms and plumbing fixtures in each structure, location of private sewage disposal system or building sewer connecting to the public sewer, and location of the proposed gray water system.

Attachment 1
Council Agenda 11-15-2022 11.A-48
Packet Page 151

(2) Details of construction necessary to ensure compliance with the requirements of this chapter, together with a full description of the complete installation, including installation methods, construction, and materials.

(3) Details for holding tanks shall include dimensions, structural calculations, bracings, and such other pertinent data as required.

(4) A log of soil formations and groundwater level as determined by test holes dug in proximity to proposed irrigation and/or disposal area, together with an analysis of water absorption characteristics of the soil and underground movement of water at the proposed site as determined by a professional geotechnical engineer duly licensed as such by the State of California.

(5) Distance between the plot and surface waters such as lakes, ponds, rivers, or streams, and the slope between the plot and the surface water, where in close proximity.

15.08.060 Amendments; California Electrical Code.

The California Electrical Code adopted in Section 15.04.010 is modified, amended and/or supplemented as follows:

A. Annexes are informative only and not adopted.

B. Administration of the electrical code shall be as set forth in Division II of Chapter 1 of the California Building Code.

C. Amend Article 230.70(A)(1) to read as follows:

(1) Readily accessible location. The service disconnecting means shall be installed at a readily accessible location either outside the building or other structure, or inside nearest the point of entrance of the service conductors. The disconnecting means shall be accessible to emergency personnel, either directly or by a remote actuating device, without requiring transit of the building interior. Dedicated electrical equipment rooms located at the building perimeter and providing direct access to the outside shall satisfy accessibility for emergency personnel.

15.08.070 Amendments; International Property Maintenance Code.

The International Property Maintenance Code adopted in Section 15.04.010 is modified, amended and/or supplemented as follows:

Attachment 1
Council Agenda 11-15-2022 11.A-49
Packet Page 152

A. Amend Section 101.1 to read as follows:

101.1 Title. These regulations shall be known as the Property Maintenance Code of the City of Pismo Beach, hereinafter referred to as “this code”.

B. Amend Section 102.3 to read as follows:

102.3 Application of other codes. Repairs, additions or alterations to a structure, or changes of occupancy, shall be done in accordance with the procedures and provisions of the California Building Standards Code and other applicable laws and ordinances.

C. Amend Section 103.1 to read as follows:

103.1 General. The office of property maintenance inspection is hereby created and the executive official in charge thereof shall be known as the code official.

D. Amend Section 103.5 to read as follows:

103.5 Fees. The fees for activities and services performed by the code official under this code shall be in accordance with the schedule as established by the applicable governing authority.

E. Add Section 104.5.1 to read as follows:

104.5.1 Citations. The code official, or duly authorized agent, is granted the authority as provided in Section 836.5(a) of the California Penal Code to issue citations for violations of this chapter.

F. Amend Section 106.4 to read as follows:

106.4 Violation penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who fails to comply with an order as affirmed or modified by the board of appeals within the time fixed herein, shall be guilty of a misdemeanor, and is subject to the penalty as provided for in Chapter 1.20 of the City of Pismo Beach Municipal Code.

The imposition of one penalty for any violation shall not excuse the violation or permit it to continue. All such persons shall be required to correct or remedy such violations or defects within a reasonable time and, when not otherwise specified, each day that prohibited conditions are maintained shall constitute a separate offense. The application of the above penalty shall not be held to prevent the enforced removal of prohibited conditions.

Attachment 1
Council Agenda 11-15-2022 11.A-50
Packet Page 153

G. Amend Section 111.2 to read as follows, and delete Sections 111.2.1 through 111.2.5.

111.2 Membership of board. The board of appeals shall be the board of appeals established in Section 113 of the California Building Code as amended in Section 15.08.010 of the Pismo Beach Municipal Code.

H. Amend Section 112.4 to read as follows:

112.4 Failure to comply. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to the penalties and code enforcement procedures set forth in Chapters 1.20, 1.24 and 1.28 of the City of Pismo Beach Municipal Code.

SECTION 4.

Under the provisions of the California Environmental Quality Act (CEQA) Guidelines Section 15061 (b) (3), this ordinance is covered by the general rule that CEQA applies only to projects which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, such as the adoption the regulations contained herein, the activity is not subject to CEQA.

SECTION 5.

This ordinance shall not be interpreted in any manner to conflict with controlling provisions of state or federal law, including, without limitation, the Constitution of the State of California. If any section, subsection, or clause of this ordinance shall be deemed to be unconstitutional or otherwise invalid, the validity of the remaining sections, subsections and clauses shall not be affected thereby. If this ordinance, or any section, subsection or clause of this ordinance shall be deemed unconstitutional or invalid as applied to any particular appeal, the validity of this ordinance and its sections, subsections, and clauses in regard to other contracts shall not be affected.

SECTION 6.

This ordinance shall become effective on January 1, 2023.

SECTION 7.

The City Clerk shall certify to the passage and adoption of this ordinance, shall enter the same in the book of original ordinances of the City and shall make a minute of the passage and adoption thereof in the records of the meeting at which the same is passed and adopted.

Attachment 1
Council Agenda 11-15-2022 11.A-51
Packet Page 154

Before the expiration of fifteen (15) days after the passage of this ordinance, the City Clerk shall cause the same to be posted in three public places within the City of Pismo Beach, to wit: 1) City Hall, 760 Mattie Road, Pismo Beach, 2) U.S. Post Office, Shell Beach Road, Pismo Beach, 3) U.S. Post Office, Crest Drive, Pismo Beach, CA.

SECTION 8.

The Building Official is hereby authorized and directed to transmit a copy of this ordinance to the California Building Standards Commission as required by California Health and Safety Code Section 17958.7.

INTRODUCED at a regular meeting of the City Council held this 1st day of November, 2022, on motion of Council Member Guthrie, seconded by Council Member Newton, and on the following roll call vote, to wit:

AYES: 5 Guthrie, Newton, Blake, Reiss, Waage
NOES: 0
ABSENT: 0
ABSTAIN: 0
RECUSED: 0

Approved: Attest:

________________________ ________________________
Ed Waage, Mayor Erica Inderlied, City Clerk

ADOPTED at a regular meeting of the City Council held this th day of , 2022, on motion of Council Member , seconded by Council Member , and on the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

RECUSED:

Approved: Attest:

________________________ ________________________
Ed Waage, Mayor Erica Inderlied, City Clerk

APPROVED AS TO FORM:

______________________________
David M. Fleishman, City Attorney
Attachment 1
Council Agenda 11-15-2022 11.A-52
Packet Page 155

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #12.A

SUBJECT/TITLE:

WATER SUPPLY UPDATE

RECOMMENDATION:

1. Receive an update on the City’s water supply; and

2. Discuss the purchase of additional drought buffer and provide staff with direction on how to proceed.

BACKGROUND:

On November 16, 2021 staff provided an update to the City Council on the City’s water supply and committed to return to the Council at the second meeting every other month to provide an update on the City’s water supply.

The staff report for that meeting can be found in the Access Pismo online public records portal1 or by scanning the QR Code at right.

In response to the worsening drought, the City Council has taken actions to protect the City’s water supply and to encourage conservation. On June 1, 2021, the City Council declared a Moderately Restricted Water Supply Condition via Resolution R-2021-049, on January 18, 2022 the City Council declared a Severely Restricted Water Supply Condition via Resolution R-2022-004, and most recently, the City Council declared a Critical Water Supply Condition via Resolution R-2022-043 and adopted an urgency ordinance enacting a prohibition on the installation of natural turf.

Water Use Restrictions
Section 13.24.060 of the City’s municipal code, which defines a Critical Water Supply Condition, states “In addition to the conditions specified in Section 13.24.050, the city council may impose any water rationing requirement as it deems appropriate to protect public health, safety, welfare, comfort and convenience.” The water use restrictions in section 13.24.050 are:

A. Use of water which causes runoff onto adjacent properties, non-irrigated areas, private and public walkways, roadways, gutters, parking lots, or structures is prohibited.

B. Outdoor water use for washing vehicles, boats, paved surfaces, buildings, and other similar uses shall be attended and have hand-controlled water devices, which shut off the water immediately when not in use.

C. No water shall be used for cleaning driveways, patios, parking lots, sidewalks, streets, or other such uses except as found necessary by the city to protect the public health or safety.

D. Outdoor irrigation
1) Outdoor irrigation is prohibited between the hours of ten a.m. and four p.m.

1 Full URL:
https://accesspismo.pismobeach.org/WebLink/DocView.aspx?id=362819&dbid=0&repo=Laserfiche Council Agenda 11-15-2022 12.A-1
Packet Page 156

2) Applying water to outdoor landscapes during and within 48 hours after measurable rainfall is prohibited.
3) Irrigation of private and public landscaping, turf areas and gardens is permitted at even-numbered addresses only on Mondays and Thursdays, and at odd-numbered addresses only on Tuesdays and Fridays. All customers are directed to use no more water than necessary to maintain landscaping.

E. Restaurants shall serve drinking water only in response to a specific request by a customer.

F. Using water in a fountain or other decorative water feature, except where the water is part of a recirculating system, is prohibited.

G. Use of potable water for compaction or dust control purposes in construction activities is prohibited.

H. Emptying and refilling swimming pools and commercial spas is prohibited except to prevent structural damage and/or to provide for the public health and safety.

In addition to the above water use restrictions the Council directed the following water use restrictions be imposed:
 Water leaks be repaired within 72 hours of notification by the City  Extending the prohibited hours for outdoor irrigation from 10 a.m. to 4 p.m. to 8 a.m. to 6 p.m.
 No new lawns to be allowed in the City

Other Agencies
Staff has reached out to other local agencies as well as agencies throughout California through the League of California Cities Public Works Department and have found that other municipalities have adopted the following water use restrictions:
 Mandatory water reduction based upon 2020 usage
o Amount of reduction ranges from 0% to 30% depending on amount of usage o Irrigation meters must reduce use 25%
o Fines for noncompliance with a one-time “water school” to have the fine dismissed
 Landscape irrigation limited to 10 minutes per station on an allowed watering day  Outdoor watering limited to one day per week
 All pools must be covered when not in use
 Mandatory 10% reduction based on 2020 usage

Update on Water Supply
The City’s water supply portfolio is made up of three sources: State Water, Lopez Lake Water, and groundwater from the Santa Maria Groundwater Basin (SMGB).

Santa Maria Groundwater Basin
The SMGB is an adjudicated basin, and the City of Pismo Beach has the right to extract 700 acre-fee per year (AFY) from the basin.

Council Agenda 11-15-2022 12.A-2
Packet Page 157

The NCMA TG has established a “Deep Well Index Threshold” level of 7.5 feet as a level that can induce seawater intrusion into the basin if the basin remains below that level for an extended period of time.

Previous Index Level
Data Collection Date: April 5, 2022
Deep Well Index Level (DWIL): 7.98 feet

0.48 feet above than the Deep Well Index Threshold

Most Current Index Level
Data Collection Date: July 11, 2022
DWIL: 5.34 feet

2.64 feet lower than the Deep Well Index Threshold

The current DWIL is 2.64 feet lower than the previous level and 1.91 feet lower than one year ago (January 2021).

Lopez Lake
Lopez Lake is still operating under the Low Reservoir Response Plan (LRRP), and because the level in Lake Lopez is below 15,000 acre-feet (AF) and expected to drop below 10,000 AF, Zone 3 agencies have reduced their entitlements by 20%. The full list of recommended reductions in municipal diversions under the LRRP are shown in Table

1. Table 1: LLRP Recommended Municipal Diversion Reduction Targets

Amount of Water In
Storage (AF)
Recommended Municipal
Diversion Reduction
Targets
Recommended
Municipal Diversion
(AFY) Targets for Pismo
20,000 0% 892.0
15,000 10% 802.8
10,000 20% 713.6
5,000 35% 579.8
1,700 100% 0

Table 2: Lake Lopez Levels November 2, 2021 – November 4, 2022 Measurement
Date
Lake Level
(AF)
%
Change
November 2, 2021 14,763.0
January 12, 2022 14,942.8 1.2%
March 9, 2022 14,508.7 -2.9%
April 5, 2022 14,331.6 -1.2%
September 9, 2022 11,942.1 -16.7%
November 4, 2022 11,226.1 -6.0%

Council Agenda 11-15-2022 12.A-3
Packet Page 158

The current lake level is 716 AF lower than it was on September 9, 2022.

Current projections show that if the area receives “average rainfall” between now and January of 2023, that storage in the lake will be approximately 10,000 AF in the middle of December 2022, as shown in Figure 1 below.

Figure 1: Lopez Reservoir Storage Projections

State Water
There are two components of State Water: Table A allocations and Drought Buffer. “Table A” refers to the amount of water an agency contracts for, while Drought Buffer is an additional allocation that can be delivered when deliveries are set below 100%. The total water delivered (Table A plus Drought Buffer) cannot be more than an agency’s Table A allocation. Further, State Water can be stored, and the amount of storage calculated based upon the total available water (Table A plus Drought Buffer) and the delivery percentage. The City has a contract for 1,240 AFY Table A allocation and 1,240 AFY of Drought Buffer.

On December 1, 2021, the State Department of Water Resources (DWR) set initial 2022 State Water Project (SWP) available supplies on a basis that ensures the SWP long-term water supply contractors can meet their outstanding minimum human health and safety Council Agenda 11-15-2022 12.A-4
Packet Page 159

demands for water (health and safety allocation). This allocation is based on minimum unmet water demands to meet domestic supply, fire protection, and sanitation needs during the year. These health and safety needs are determined to be not more than 55 gallons per capita per day (gpcd), consistent with the recent State Water Resources Control Board (SWRCB) emergency curtailment regulations. Agencies with stored water, or other sources of water will not receive a SWP delivery at this time.

On January 20, 2022 the DWR increased SWP deliveries to 15%, however on March 18, 2022 the deliveries were reduced to 5% This means that the City of Pismo Beach can expect to receive 62 AF of Table A allocation and 62 AF of Drought Buffer for a total of 124 AF of State Water. However, the County of San Luis Obispo has agreed to make its subcontractors whole, meaning the City can take delivery of 1,240 AF of State Water from the County.

The City’s current water supplies without additional State Water from the County are shown in Table 3, below.

Table 3: Current Pismo Beach Water Supplies

Source
Full
Allocation
(AF)
Percent of
Allocation Allocation (AF)
SMGWB* 700 30% 210.0
State Water** 1,240 5% 62.0
Drought Buffer*** 1,240 5% 62.0
Stored State Water 0.0
Lopez Water# 892 80% 713.6
Lopez Surplus 300.8
Total 2,692 1348.4
*Santa Maria Groundwater Basin
**In previous reports the City’s Table A water was reported as 1,140 AF, however since the last update to the City Council the City reached a settlement with an outside agency for the return of 100 AF of State Water that was previously sold to the outside agency.
***Drought buffer is an additional allocation of water that can only be delivered when State Water Deliveries are less than 100%. The total amount of State Water delivered including drought buffer cannot exceed 1,240 AF in a given year.
#Lopez Lake is projected to drop below 10,000 AF in December of 2022. At that time allocations from the lake would drop to 80% retroactively, therefore for planning purposes an 80% allocation is assumed.

Taking into account the State Water the County has agreed to deliver to the City of Pismo Beach, the City’s total available water supply is 2,464.4 AF for 2022.

Council Agenda 11-15-2022 12.A-5
Packet Page 160

Precipitation
The City’s two local water supplies, Lopez Lake and the Santa Maria Groundwater Basin, are highly dependent on rainfall. Calendar year 2020 saw a significant short fall in precipitation, while 2021 saw only a small surplus of rain. So far, 2022 has proven to be drier than both of the previous years. Rainfall data for these years is shown in Table 4, below.

Table 4: Average and Actual Rainfall from January 2020 to October 2022

Month
Average
Rainfall
(in) *
2020
Rainfall
(in)
Delta
(in)
2021
Rainfall
(in)
Delta
(in)
2022
Rainfall
(in)
Delta
(in)
Jan 3.59 0.61 -2.98 6.46 2.87 0.0 -3.59
Feb 3.87 0.0 -3.87 0.03 -3.84 0.08 -3.79
Mar 3.46 8.02 4.56 2.53 -0.93 1.08 -2.38
Apr 1.13 1.72 0.59 0.0 -1.13 0.49 -0.64
May 0.41 0.0 -0.41 0.1 -0.31 0.0 -0.41
Jun 0.07 0.0 -0.07 0.0 -.07 0.0 -0.07
Jul 0.03 0.0 -0.03 0.03 0.0 0.0 -0.03
Aug 0.02 0.0 -0.02 0.0 -0.02 0.0 -0.02
Sep 0.32 0.0 -0.32 0.0 -0.32 2.62 2.30
Oct 0.62 0.04 -0.58 1.95 1.33 0.0 -0.62
Nov 1.7 0.49 -1.21 0.46 -1.24
Dec 2.57 1.21 -1.36 7.69 5.12
Total 17.79 12.09 -5.7 19.25 1.46 0.08 -9.25**
*Average rainfall from http://longrangeweather.com/
** total difference for only the months shown

Options for Drought Mitigation: Purchase Additional Drought Buffer Through State Water

The Department of Water Resources administers long-term water supply contracts to 29 local water agencies for water service from the State Water Project. The County of San Luis Obispo Flood Control and Water Conservation District (District) is one of the 29 State Water Contractors with a contract for 25,000 AF of water and has subcontracts with local agencies within San Luis Obispo County. Table 5, below, shows the eleven State Water Subcontractors with the District as well as their Table A and Drought Buffer contracted amounts.

Council Agenda 11-15-2022 12.A-6
Packet Page 161

Table 5: Table A and Drought Buffer allocations by subcontractor Agency Table A
(AFY)
Drought
Buffer
(AFY)
Total
(AFY)
Subscription
Percentage
CSA 16 (Shandon) 100 0 100 0.40%
Morro Bay 1,313 2,290 3,603 14.41%
CMC 400 400 800 3.20%
County Ops Center 425 425 850 3.40%
Cuesta College 200 200 400 1.60%
Pismo Beach 1,240 1,240 2,480 9.92%
San Miguelito MWC 275 275 550 2.20%
Avila Beach CSD 100 100 200 0.80%
Avila Valley MWC 20 60 80 0.32%
San Luis Coastal USD 7 7 14 0.06%
Subcontractor Total 4,830 5,747 10,577
District’s Unsubscribed Total 14,423

In the past, including this year, the District has used its unsubscribed State Water Allocation and Stored State Water to make its subcontractors whole (i.e. delivered their full Table A allocation) when State Water Deliveries have been low. At the July 8, 2022 State Water Subcontractors Advisory Committee meeting, County staff, representing the District, informed the subcontractors that the District would be announcing by the end of the year a “first right of refusal” to the subcontractors to purchase the District’s unsubscribed allocation. Any portion of the unsubscribed allocation that is not purchased by subcontractors will likely be sold, or otherwise obligated and would not be made available to subcontractors to make them whole in the future.

The District is currently gathering information as to how much, if any, additional State Water each subcontractor would like to add to their portfolio. Once District staff receives requests from each of the subcontractors, it will be able to determine if the full request can be fulfilled, or if requests will need to be modified to accommodate all of the subcontractors’ requests.

Staff has looked at different scenarios of how a portion of the unsubscribed allocation could be put to beneficial use for the City of Pismo Beach and has included two of them in this report for the Council’s consideration.

Option A – Full State Water Allocation at 20% DWR Delivery This option provides for the City of Pismo Beach to take full delivery of the 1,240 AF Table A allocation when deliveries from the State Water Project are set to 20%. This would be achieved by increasing the City’s drought buffer allocation by 3,720 AFY from 1,240 AFY to 4,960 AFY. At a 20% delivery, the City could expect to receive 248 AF of Table A deliveries plus 992 AF of drought buffer for a total delivery of 1,240 AF. The cost of drought buffer is approximately $205/AFY, therefore this option would have a fiscal impact of an additional $762,600 per year to the Water Enterprise Fund.

Council Agenda 11-15-2022 12.A-7
Packet Page 162

Option B – 1,800 AF of Total Water Supply at 20% DWR Delivery The goal of this option is for the City to be able to take delivery of 1,800 AF of water when SWP deliveries are set to 20%. This option assumes that the City can take delivery of 80% of its Lopez Lake deliveries (or 713.6 AFY) and pump 200 AF from the Santa Maria Ground Water Basin. That means the City would need to take delivery of 886.4 AF of State Water. This could be achieved by increasing the City’s drought buffer allocation by 1,952 AFY from 1,240 AFY to 3,192 AFY. This option would have a fiscal impact of an additional $400,160 per year to the Water Enterprise Fund.

When evaluating the available options, State Water Storage must be considered. State Water storage follows a series of equations depending on the delivery percentage. When deliveries are from 0–50%, the maximum storage amount is 25% of the total available water (Table A plus drought buffer). When deliveries are from 51–74%, the maximum storage amount is 25% plus 1% for every point over 50%. Finally, when deliveries are over 74%, the maximum storage amount is 50% of the total available water.

Option A gives a total contracted amount (Table A plus drought buffer) of 6,200 AFY, while Option B gives a total contracted amount of 4,432 AFY. Table 6, below, shows the amount of storage that could be generated from each option under different delivery scenarios

Table 6: Total Available Water and Maximum Storage Amounts for Various Deliveries for Option A and Option B
Delivery
Percentage
Option A Option B
Total
Available
Max
Storage
Total
Available
Max
Storage
10% 620 155 443.2 110.8
25% 1,550 387.5 1,108 277
50% 3,100 775 2,216 554
65% 4,030 1,612 2,880.8 1,152.3
85% 5,270 2,635 3,767.2 1,883.6
100% 6,200 3,100 4,432 2,216

The actual amount that will be put into storage is equal to the maximum storage amount minus the amount of State Water used.

, below shows the amount of water available to the City at the beginning of each year from 2021 for our current water supply, as well as the two options being considered for additional State Water Drought Buffer. The chart assumes a full Lopez entitlement and 300 AF of groundwater. , below, shows the amount of stored State Water generated each year for our current water supply as well as the two options being considered.

Council Agenda 11-15-2022 12.A-8
Packet Page 163

Figure 2: Amount of Available Water at Start of Year

Figure 3: Amount of Stored State Water Generated by Year

Should the City Council choose to add additional drought buffer to the City’s water supply portfolio, staff recommends that the City consider relinquishing a portion of or all of the additional state water back to the County after Central Coast Blue is online and producing water.

0.00 1000.00
2000.00
3000.00
4000.00
5000.00
6000.00
7000.00
2013 2014 2015 2016 2017 2018 2019 2020 2021
Water  at Start of Year
Current Opt A Opt B

0.00 200.00
400.00
600.00
800.00
1000.00
1200.00
1400.00
1600.00
1800.00
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Stored State Water
Current Option A Option B
Council Agenda 11-15-2022 12.A-9
Packet Page 164

Conclusion and Recommendation
Staff recommends that the City Council discuss the options for increasing State Water Drought Buffer and provide staff with direction on how to proceed. Should the Council direct staff to move forward with increasing State Water Drought Buffer, staff will return at the next available Council meeting with a Resolution to that effect.

FISCAL IMPACT:

An increase to the City’s State Water Drought Buffer would be paid for from the Water Enterprise Funds.
Option A, increasing State Water Drought Buffer to 4,960 AFY would cost an additional $762,600 per year for fiscal years (FY) 2023 through 2026 for a total of $3,050,400.
Option B, increasing State Water Drought Buffer to 3,192 AFY would cost an additional $400,160 per year for FY 2023 to FY 2026, for a total of $1,600,640.

The proposed Water/Wastewater Rate Study includes approximately $379,000 per year for water main replacement as a preventive measure for FY 2023 through FY 2026.

Should the Council direct staff to purchase additional drought buffer, staff recommends postponing this maintenance and using the funds for the additional expenditure associated with the additional drought buffer.

ALTERNATIVES:

1. Purchase other quantities of drought buffer.

2. Provide Staff with direction to seek other alternatives for water delivery.

3. Request more information.

ATTACHMENTS:

None
Submitted by: Meeting Date: November 15, 2022
Benjamin A. Fine, P.E., Director of Public Works/City Engineer City Manager Approval:

Council Agenda 11-15-2022 12.A-10
Packet Page 165

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #12.B

SUBJECT/TITLE:

OPTIONS FOR THE PIER AVENUE STAIRS

RECOMMENDATION:

Review options for the Pier Avenue Stairs and provide staff with direction on how to proceed.

BACKGROUND:

The Pier Avenue Stairs have been a fixture of Shell Beach dating back to the 1970s.

Records of the construction of the stairs are no longer available; however, based upon historic photographs from the California Coastal Records Project1, it appears the stairs date back to at least May of 1979 and possibly as far back as 1972. This means that the stairs are 40 or more years old, and are nearing or past the end of their design service life. The City has regularly maintained the stairs, including a significant repair project in August of 2005.

The Pier Avenue Stairs provided access to approximately 800 feet of coastline within an isolated pocket beach, extending from the intersection of Ocean Boulevard and Windward Avenue to the north, to the tip of Margo Dodd Park to the south.

On October 26, 2021, the City closed the stairway due to a lower bluff failure caused by storm activity, which left a portion of the third landing (from the top down) unsupported and hanging in space. In addition, it appears the storm sheared the supports of the bottom section of the stairs from their footings. With the closure of the Pier Avenue Stairs, there is no beach access south of Boeker Avenue until the beach access located at the Inn at the Cove, which is approximately a half-mile walk from Margo Dodd Park.

Staff retained the services of ENGEO Incorporated (ENGEO), formerly TerraCosta Consulting Group, Inc., to inspect the stairs and adjacent bluff and to make recommendations to restore beach access in this part of Shell Beach.

In its report (Attachment 1), ENGEO noted several portions of the coastal bluffs that are experiencing erosion, including a sea cave, previously noted by staff, that extends under the shoulder of Ocean Boulevard near the intersection with Windward Avenue. ENGEO also noted that the existing seawall protecting the bluff near Margo Dodd Park is in critical need of maintenance to reduce the risk of accelerating the loss of public resources and access, including potentially a portion of Ocean Boulevard.

1 www.californiacoastline.org
Packet Page 166

Options for Repair/Replacement of the Pier Avenue Stairs ENGEO examined the existing conditions of the bluff from Windward Avenue to Margo Dodd Park, the available parking along the bluff top and anticipated future site conditions, taking into account sea level rise and developed the following options.

Option 1 – Temporary Repairs to Existing Stairway, $1,500,000 This option includes the minimum interim temporary repairs to reopen the Pier Avenue Stairs to the public. The project includes the installation of a 4-foot-diameter concrete pier extending from the middle of the partially-unsupported third landing down into the shore platform bedrock. This would require the removal of the third landing and the installation of temporary shoring of the second and third flight of stairs.

The anticipated cost of this project is $1,500,000 and does not include repair of the lower stainless steel foundations or any Building Code-required upgrades, nor does it include repairs to the sea wall near Margo Dodd Park.

Because the rest of the staircase is past its useful life and may need to be rebuilt within 3–5 years in its entirety, in addition to the cost of this repair, staff does not recommend this option.

Option 2 – Replace Stairway within Existing Alignment, $2,350,000 This option includes the installation of new, deepened foundations at all of the landings and an entirely new stairway system. The new deepened foundations would provide long- term survivability of the stairway as additional erosion and bluff failures continue to reduce the size of the existing headland that currently supports the stairway. ENGEO provided the option for a solid pedestrian parapet on the bottom section of stairs, similar to the Memory Park Stairs, or an open pedestrian parapet with the installation of either real or faux rocks at or slightly above the High Tide Line to dissipate wave energy within the cove.

The anticipated cost of this project is $2,350,000 and does not include repairs to the seawall near Margo Dodd Park. While this option results in a new staircase, the staircase is vulnerable to wave energy and further erosion, and it does not protect the bluff from further erosion.

Option 3 – New Stairway with Beach Access from Margo Dodd Park, $4,800,000 Option 3 involves construction of a new public beach access stairway near the entrance to Margo Dodd Park. The new stairway would be incorporated into the Margo Dodd seawall repairs and outlet onto the beach immediately upcoast and behind the existing headland having two existing sea caves. Moving the stairs to Margo Dodd Park also has the advantage of approximately 30 more parking spaces in close proximity.

The beach at this location is relatively narrow, but it is less exposed to direct wave energy than the existing landing of the Pier Avenue Stairs. However, the adjacent steep bluff is vulnerable to collapse and therefore it is recommended that additional bluff scaling be performed to create a buffer for the bottommost stairway landing. This project also Packet Page 167

includes the infilling of the two sea caves to maximize public safety and revitalize the natural protection to the bottom section of the proposed stairway.

The anticipated cost of this project is $4,800,000 and includes the repair of the existing seawall, sea caves and stabilization, by scaling and laying back the steep bluff near the bottom section of the stairs.

Option 4 – New Stairway with Beach Access from Palisade Avenue, $5,200,000 This final option is similar to Option 3, however the entrance to the new stairway would start across from Palisade Avenue instead of at Margo Dodd Park. This option calls for the stairway to be built on-grade. One possible advantage of this option is that the upper portion of the stairway would provide a more gradual and natural descent down the upper portion of the bluff, providing a more visually and physically comfortable user experience when compared to Option 3. However, this option also has the disadvantage of the entrance not being as favorable for accommodating congregating when compared with the Margo Dodd Park access.

The anticipated cost of this option is $5,200,000.

Option 5 – Removal of the Existing Stairway, $430,000
Staff also prepared an estimate to remove the existing stairs and restore the beach and bluff. This project would be anticipated to cost $430,000.

Exploring Potential Partnerships
In addition to making repairs to the stairway and bluff area, there are also bluff issues and a need to repair drainage at the end of Cliff Ave. Including this work in the project would be advisable for a complete repair of the bluff area along Ocean Boulevard and could increase total repair costs to $10-15 million dollars. In this instance, the City may wish to pursue partnerships with other state and federal agencies to bring in additional dollars and technical assistance to the project. The City has partnered with the Army Corps of Engineers in the past on a CAP 103 project to build the stairs and protect the lift station in the St. Andrews Tract. Due to the significant cost of these projects, the City Council may wish to direct staff to pursue partnerships like these before determining which option to proceed with.

Conclusion and Recommendation
The Pier Avenue Stairs are currently unusable and could be a hazard to public health and safety should the public not obey the closure signs. Staff recommends that the City Council discuss options for the Pier Avenue Stairs and provide staff with direction on how to proceed.

FISCAL IMPACT:

The fiscal impact of the Pier Avenue Stairs depends on which option is implemented.

These potential costs range from $430,000 to $5,200,000, which would need to be supported by the General Fund. Depending on the option chosen and the cost, it is likely Packet Page 168

that Council will need to consider delaying or reducing other planned projects. Staff would come back to Council to appropriate the funds.

ALTERNATIVES:

1. Do not provide direction at this time.

2. Request more information.

ATTACHMENTS:

1. ENGEO Alternative Analysis
Submitted by: Meeting Date: November 15, 2022
Benjamin A. Fine, P.E., Director of Public Works/City Engineer City Manager Approval:

Packet Page 169

GEOTECHNICAL

ENVIRONMENTAL

WATER RESOURCES

CONSTRUCTION SERVICES

COASTAL/MARINE GEOTECHNICS
Project No.
19892.000.001
November 4, 2022
Mr. Eric Eldridge
City of Pismo Beach
760 Mattie Road
Pismo Beach, California 93449
Subject: Pier Avenue Stairs
Pismo Beach, California

ALTERNATIVES ANALYSIS
Dear Mr. Eldridge:

We are pleased to present the following alternatives analysis for repairing, replacing, and/or creating additional points of public beach access in the vicinity of the Pier Avenue Stairs, located near the intersection of Ocean Boulevard and Pier Avenue in Pismo Beach, California. Our alternatives analysis is based upon our preliminary site reconnaissance performed with you on October 29, 2021, our more thorough site reconnaissance performed on March 27, 2022, our review of freely available historic imagery of the project site area, and our work on other nearby projects having similar geotechnical and marine characteristics. This includes our 40+ years of experience associated with designing, permitting, and constructing these types of specialty coastal projects. Provided below is a discussion of the background, geologic setting, existing site conditions, anticipated future site conditions, stairway alternatives, and preliminary construction cost estimates for each stairway alternative.

BACKGROUND
Based on our review of the historic photographs available on the California Coastal Records Project website ( www.californiacoastline.org) , we believe some version of the Pier Avenue public access stairway may have existed in May of 1979, and possibly as far back as 1972. However, the quality and resolution of these early photographs make it difficult to determine the year in which the beach access stairway was established. Minimally, we would suggest that the stairway may now be approximately 40+ years in age (nearing its design service life). However, the stairway also appears to have been regularly maintained and had significant repairs completed in August 2005, based on our review of the City-provided Garing Taylor & Associates as-built plans.

While a majority of the stairway’s treads are now pressure-treated timbers, a number of the original concrete treads still exist within the upper two flights of the stairway. The hand railings and balusters within the upper three flights are painted galvanized steel (upper approximately 80%), while the hand railings and balusters within the lowest flight (lower approximately 20%) are stainless steel, designed as a result of being located more proximally to the corrosive wave impact zone.

On October 26, 2021, the stairway was closed due to a lower bluff failure (resulting from storm damage) that left a portion of the third landing (from the top down) unsupported and hanging in Council Agenda 11-15-2022 12.B-1
Attachment 1
Packet Page 170

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 2

space (Photo 1, Figure A1 in Appendix A). In addition, the storm appears to have damaged the lowest flight of the stairway (the stainless steel section), which is now bent and sheared from two of its footings, slightly shifting the bottom alignment of the stairway landward (Photo 2, Figure A1).

During our two site visits, we also observed spalling concrete and exposed rebar within many of the existing shallow footings (Photo 3, Figure A1), corrosion of the painted galvanized steel railings and balusters in the upper three flights (Photo 4, Figure A1), and spalling concrete in a majority of the original treads (Photo 5, Figure A1), including loose screws and graffiti along the stringers of the lowest flight (Photo 6, Figure A1).

With respect to coastal access in this general area, the closure of the Pier Avenue stairway, accompanied by the closure of the Morro Avenue stairway in October 2015 (also due to storm damage), currently leaves approximately 1.2 miles of coastline inaccessible to the public between the next two closest beach access stairways located at Vista del Mar Avenue and the privately owned Inn at the Cove (Vicinity Map, Figure 1). Given the relatively tall bluff along this section of coastline, which further limits beach access and also intensifies and concentrates public use at the few available remaining access locations, it is no surprise that the public has been regularly observed circumventing the closure barriers/warnings and continuing to use the stairway despite its aged and damaged condition, making it apparent that additional points of public beach access are needed in this region. Exhibit 1 provides a view of the lower portion of the stairway, and exemplifies the potential danger that the stairway presents to beachgoers.

Recognizing the significant public use of the area (via official and unofficial means) and the California Coastal Commission’s goals of providing vertical public beach access along the coastline at an approximately 500-foot interval (where feasible), temporarily repairing the existing access and, for the long term, providing additional public access alternatives would aid in dispersing concentrated public use along what is currently about a 1.2-mile gap between the limited number of available points of public beach access.

EXHIBIT 1: Pier Avenue Stairway (Source: ENGEO Incorporated, March 2022)

Council Agenda 11-15-2022 12.B-2
Attachment 1
Packet Page 171

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 3

GEOLOGIC SETTING

The Pier Avenue stairway provides access to an approximately 800-foot stretch of coastline within an isolated pocket beach, extending from the intersection of Ocean Boulevard and Windward Avenue at the upcoast end of the cove, to the western tip of Margo Dodd Park at the downcoast end of the cove (Figure 2). The entrance to the stairway sits atop an approximately 40-foot-tall coastal bluff that is part of the gently southwesterly sloping coastal terrace between the Pacific Ocean shoreline and the lower foothills of the San Luis Range in the Coast Ranges geologic and geomorphic province.

Structurally, the project area is situated on the southwesterly flank of a long synclinal (concave) fold with a northwest/southeast-trending axis of the Pismo Syncline (Figure 3). This major structural feature (estimated to be 4- to 5-miles wide and 25± miles long) was formed, along with associated faulting, during a long period of regional tectonic activity and continued to grow throughout most of Miocene and Pliocene time, thus creating the Pismo Depositional Basin, which extends from Arroyo Grande on the southeast to coastal Point Buchon on the northwest.

Our review of California Geological Survey’s Special Publication 42 indicates that the coastal bluff along Ocean Boulevard is not located within or crossed by a State-delineated Alquist-Priolo Earthquake Fault Zone. Alquist-Priolo Earthquake Fault Zones are typically delineated along active faults. An active fault is defined as one that has “had surface displacement within Holocene time” (approximately the last 11,000 years). At the top of the coastal bluff at the Pier Avenue stairs, the cove area is underlain by late Pleistocene-age marine terrace deposits consisting of beach and nearshore sands and gravels covered by alluvium and colluvium. Underlying these deposits is an older emergent wave-cut shore platform that has been regionally uplifted (tilted and folded), and locally consists of Miocene-age Obispo Formation. The Obispo Formation is predominantly comprised of yellow to brown tuffacous siltstone and claystone. The Obispo Formation is the predominant relatively resistant basal cliff-forming unit that is observed and mapped locally along this section of coastline and, more importantly, is within the tidal/wave impact zone. When this unit is exposed to wave energy over time, the folded broken up and softer layers within the unit slowly erode, leading to surge channel development, overhanging notches, sea caves, and eventually roof collapse with upper-bluff failures eventually extending up through the terrace deposits. An example of this long-term geologic process can be seen at the nearby Dinosaur Caves Park with its multitude of sea caves that are in various stages of growth and collapse, which can be sudden and may not necessarily coincide with a storm event. It is also worth noting that this geology (tilted bedding), coupled with marine-based erosion occurring along the toe of bluff, contributes to the ominous nature of the locally overhanging bluffs, particularly at the bottom landing of the Pier Avenue stairway, which should be addressed to mitigate potential public safety issues.

EXISTING SITE CONDITIONS

On October 29, 2021, just a few days after the lower bluff failure occurred at the Pier Avenue stairway, we performed a preliminary site reconnaissance with you. We observed the clearly visible unsupported third landing. However, the high tide and rough surf conditions at the time did not allow for an in-depth evaluation. To perform a more thorough observation of the stairway and the entire Pier Avenue beach area in which alternative public access could be implemented, we performed an additional site reconnaissance on March 27, 2022, and again on May 18, 2022, both during tidal lows. The following subsections discuss the existing Pier Avenue cove area Council Agenda 11-15-2022 12.B-3
Attachment 1
Packet Page 172

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 4

conditions based on our site visits and review of freely available historic imagery, starting at the upcoast end of the cove near the intersection of Ocean Boulevard and Windward Avenue, and making our way toward the western tip of Margo Dodd Park at the downcoast end of the beach.

Region Upcoast of Pier Avenue Stairway

Exhibit 2 provides an oblique aerial view in 2018 of the region upcoast of the Pier Avenue stairway.

EXHIBIT 2: View of Region Upcoast of the Pier Avenue Stairway (Source: Shell Beach Coastal Conservancy Preserve, Steve Perry, February 2018)

The furthest point upcoast within the cove is defined by a northwesterly trending, developing sea cave and two northerly wave-cut notches (Photos 7 and 8, Figure A2), the approximate landward limits of which are depicted below on Exhibit 3, and is essentially where public parking along the seaward side of Ocean Blvd begins. Notably, we estimate that there are currently approximately 15 parallel parking spaces (9’x22’) between Windward Avenue and the Pier Avenue Stairway, and another 30 potential parking spaces downcoast of the stairway towards Margo Dodd Park and Cliff Avenue, suggesting this stairway handles significant pedestrian traffic, including kayaking and youth day camp field trips to the area.

Council Agenda 11-15-2022 12.B-4
Attachment 1
Packet Page 173

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 5

EXHIBIT 3: Limits of Sea Cave and Notches in the Region Upcoast of the Pier Avenue Stairway (Source: Nearmap, August 2019)

The northwest portion of this large section of overhanging bluff currently extends approximately 35 feet horizontally beneath the top-of-bluff (and the adjacent unimproved roadway shoulder).

The two adjacent notches currently extend horizontally between approximately 10 and 15 feet beneath the top-of-bluff. The supporting roof material currently consists of 20± feet of a relatively thick section of the Obispo Formation. While this area is not presently a concern, the roof rock thickness should continue to be monitored for potential future loss of the existing relatively thick roof rock section. Based on rough order of magnitude field measurements, the distance between Ocean Boulevard and the top-of-bluff in this area ranges from 25 to 30 feet. Our review of California Coastal Records Project ( www.californiacoastline.org) aerial photographs dating back to 1972 (Image 7227066, Image 7940042, Image 8708072, Image 8910119, Image 2356, Image 200403918, Image 200510183, Image 201007243, Image 201317456, Image 201503102, Image 201902554) suggests this overhanging bluff area has existed for at least the past 50 years. The 2002 California Coastal Records Project photographs, which are of higher quality than many of the earlier historical photographs, also suggest that only a couple feet of erosion may have occurred in this area over the last 20 years. This is in stark contrast to the 20 to 30 feet of documented erosion that has occurred in other nearby regions of the Pismo/Shell Beach area over the last 20 years. At this location, it is our opinion that this localized lower erosion rate is likely attributable to the relatively consistent presence of many large nearshore formational outcrops within the shore platform that help dissipate wave energy originating from both the north and south.

As we move downcoast from this overhanging bluff area, there are three distinct northeasterly trending erosional features (nooks/recesses) within the bluff and back beach immediately upcoast Council Agenda 11-15-2022 12.B-5
Attachment 1
Packet Page 174

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 6

of the Pier Avenue stairway (Photos 9 through 12, Figure A2). Based on our review of the offshore bathymetry, aerial imagery, and geologic maps, we infer that there likely exists a relatively small nearshore localized depression in the bedrock shore platform allowing increased wave energy from the south/southwest, locally increasing erosion within the Obispo Formation (see Exhibit 4).

The increased wave energy within the depicted westerly corridor is likely contributing to the overhanging bluff condition previously discussed and shown on Exhibit 3, along with the nook/recess development and erosion in the vicinity of the Pier Avenue stairway. Horizontal depth measurements of the southerly two (larger) nooks/recesses are approximately 60 to 70 feet landward from the adjacent headlands. Our review of the available aerial imagery suggests these features may have advanced tens of feet landward over the last 50 years. Along the top-of-bluff, there is approximately 10 feet between the Ocean Boulevard curb, just above the middle nook/recess, which then descends to beach level at an approximately 1/2:1 (H:V) gradient. At the nook/recess immediately upcoast from the Pier Avenue stairway, there is approximately 13 feet between the Ocean Boulevard curb and the top-of-bluff (which is reduced to approximately 5 feet from the top-of-bluff if you include the shoulder parking area). From the top-of-bluff, this nook/recess descends at a near-vertical slope down to beach level. It should also be noted that a storm drain outfall pipe and top-of-bluff concrete headwall existed in this nook/recess until about 2005, which may have been rerouted/abandoned. Overall, the City should anticipate that these nooks/recesses will continue to expand (growing landward and laterally), and will eventually threaten both Ocean Boulevard and the Pier Avenue Stairway.

EXHIBIT 4: Nearshore environment of the Pier Avenue Stairway (Image Source: Google Earth, September 7, 2018)

Pier Avenue Stairway Region

Currently, the Pier Avenue Stairway is located on a headland that extends approximately 80-feet seaward of Ocean Boulevard. Due to the overall height and topography of the bluff, the stairway Council Agenda 11-15-2022 12.B-6
Attachment 1
Packet Page 175

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 7
is comprised of a circuitous series of four flights and five landings, shown in Exhibit 5), and where the overall alignment takes advantage of the existing topography, to descend down the face of the bluff. Additionally, there exists a lower-bluff shelf within the Obispo Formation in which Landing 3 is founded, which is now partially unsupported due to the bluff collapse that occurred on October 26, 2021 (forcing the City to close the stairway). Based on our site visits and review of readily available historical imagery, we estimate that approximately 8 feet of erosion/bluff loss occurred during this single event. We believe that the failure is also associated with the presence of a relatively small sea cave that is located directly beneath the landing. Post-collapse, the remaining portion of the sea cave is now on the order of 6’x6’x6’ (LxWxH), noting that the mid-interior of the cave balloons to approximately 12 feet in width. Coastal Records 2002 image 2356 provides historic context of the stairway, landings, geologic site conditions (including the lower-bluff shelf), and the sea cave almost 20 years prior to the recent bluff collapse.

EXHIBIT 5: Existing Condition - Pier Avenue Stairway (Image Source: Nearmap, July 3, 2021)
With respect to the current stairway alignment and bottommost landing, we believe it has been as optimally located as possible given the need to strike a balance between the two main potential public safety issues (i.e., rockfall and wave impacts). Historically, it has withstood continued erosion and the developing steepening and overhanging bluff condition within this overall beach area. In the future, the coastal bluffs around this isolated pocket beach will continue to steepen, requiring ongoing scaling of the bluffs. With any additional loss of sand or sea level rise, there is also a narrowing of the beach face, forcing the public closer to the coastal bluffs.

Region Downcoast of Pier Avenue Stairway (Margo Dodd Seawall and Park) Exhibit 6 provides an oblique aerial view from 2018 of the region downcoast of the Pier Avenue stairway, from the existing CMP storm drain outfall pipe to the western tip of Margo Dodd Park.

Council Agenda 11-15-2022 12.B-7
Attachment 1
Packet Page 176

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 8

As mentioned previously, we estimate that there exists double the available parking in this area on the downcoast side of the Pier Avenue stairway, approximately 30 parallel parking spaces (9’x22’) along the seaward side of Ocean Boulevard, adjacent to Margo Dodd Park, and ending near the intersection of Cliff Avenue, making it an approximately 1,000-foot trek to the beach below. While not a significant distance, it is the likely impetus contributing to the numerous unofficial goat paths that have developed over the years around Margo Dodd Park and along the top of the Margo Dodd seawall. Arguably, the area along the top of the seawall is attractive for fishing and exploration, and we have regularly observed visitors in these areas during our site visits over the years.

EXHIBIT 6: View of Region Upcoast of the Pier Avenue Stairway. Orange arrow points to recent bluff failure discussed below (Source: Shell Beach Coastal Conservancy Preserve, Steve Perry, February 2018)

Our review of the bluff between the existing CMP storm drain outfall pipe (located approximately 85 feet southeast of the Pier Avenue stairway) and the downcoast end of the Margo Dodd seawall suggests that only a few feet of erosion has occurred over the last 20 years. However, the bluff face in this region has become noticeably steeper over the last 50 years. Typically, an oversteepening of the coastal bluff eventually leads to episodic increased bluff failures and landward migration of the top-of-bluff. This is exemplified where the orange arrow is shown on Exhibit 6, where a sizeable bluff failure occurred in between two of our site visits in the absence of any large storms. Presently, the distance between Ocean Boulevard and the top-of-bluff in this area ranges between 30 and 55 feet.

Immediately upcoast of the Margo Dodd seawall, there exists a westerly extending headland with two sea caves that we used to access the front face of the wall (Photos 13 through 16, Figure A3). The larger, more landward sea cave is approximately 24-feet long in the north-south direction, ranges from 20- to 32-feet long in the east-west direction, and ranges from 4 to 9 feet in height, while the smaller, more seaward sea cave is approximately 17-feet long in the north- south direction, ranges from 6- to 27-feet long in the east-west direction, and ranges from 4 to 6 feet in height.

Council Agenda 11-15-2022 12.B-8
Attachment 1
Packet Page 177

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 9

Based on our review of the City-provided background information associated with the Margo Dodd seawall, our understanding is as follows:

1. The seawall is an existing approximately 150-foot-long by 21-foot-tall wall (18-feet tall with an average 3-foot concrete keyway) located immediately upcoast from Margo Dodd Park.

2. While there exists very little information to review pertaining to the age and design of the original triangular-shaped multi-tiered concrete gravity mass seawall, the documentation suggests erosion and wave overtopping were of concern to both a resident (428 Ocean Boulevard ) and the City in the late 1980s.

3. Mr. Fred Schott was retained to design an approximately 8-foot-tall wall extension that was constructed atop the original triangular mass, circa 1991. This repair primarily consisted of placing a thin wearing surface or architectural cladding over the front face of the existing triangular mass, adding a 7’8”-tall by 1’3”-thick wall extension with wave deflector, thereby increasing the overall wall height, and constructing a series of shallow counterforts with footings along the landward side of the wall extension spaced roughly 20 to 28 feet apart. Negating the tiedowns and doweling into existing concrete or formation that is a signature of Mr. Schott’s designs, these counterforts and footings do not extend (vertically) lower than the top-of-tier of the original triangular gravity mass.

4. Circa 1993, Mr. Dennis Schallenberger with Earth Systems Consultants performed a site reconnaissance to observe a developing erosional void behind the southern wall end and recommended filling the void with slurry. However, it is not clear from the documentation (and our recent site visits) if this infilling actually occurred.

5. In early February 1998, Mr. Schallenberger and Mr. Rick Gorman (both with Earth Systems Consultants) performed another site reconnaissance to observe a much larger void developing in the same area along the southern end of the wall, which revealed several interconnected caves. At the time, they opined that collapsed formational blocks from the outer cave would form a pile near the entrance of the inner cave, forming a protective barrier that reduced the potential for future erosion. However, their recommendations also describe a series of steps for repairing the void in the wall to mitigate additional surficial slope failures that could eventually propagate further into the park near the gazebo. Again, based on our review of the provided information and our site visits, it is not clear if these repairs were completed.

Regardless of whether or not the suggested 1993 and 1998 erosional maintenance infill repairs were completed, it has been 30 years since the Fred Schott wall extension was completed. Given our contemporary review of the nearshore and offshore environment in this region (e.g., wave exposure depicted on Exhibit 4), it is our opinion that this approximately 150-foot-long seawall and the adjacent geologic outcrops (Photos 17 and 18, Figure A4) continue to provide vital protection to the coastal bluff, Margo Dodd Park, and the Ocean Boulevard corridor, and equally important, preserve public access and recreational opportunities along this scenic section of Pismo Beach. Today, based on our assessment of this wall, it is our opinion that it is time to perform critically needed maintenance or risk accelerating the loss of these public resources and a portion of the roadway. This is based on the following observations:

Council Agenda 11-15-2022 12.B-9
Attachment 1
Packet Page 178

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 10

1. The 3-foot-thick concrete keyway (original triangular gravity mass wall) at the toe of the seawall is now notched and scoured, and no longer in intimate contact with the underlying formational shore platform laterally along the wall in numerous locations, with some of these voids extending as much as 6.5-feet deep from the seaward face of the concrete keyway, and others typically on the order of 2.5 feet in depth (Photo 19, Figure A4).

2. At the downcoast end of the seawall, a sea cave extends under Margo Dodd Park, wrapping around and behind the wall, which opens up to a large void where extensive piping (soil loss) of the wall backfill has occurred (Photo 20, Figure A4). While it is unclear if this area has been previously repaired, it is apparent from the historical imagery that there exists regular uncontrolled public use of the area, as noted by the presence of orange construction fencing visible in the 2002 California Coastal Records Project photographs ( www.californiacoastline.org , Image 2357). This construction fencing was likely installed in the vicinity of the top-of-wall to alert the public using the unofficial access to the presence of the developing void.

3. More recently, possibly sometime in 2019 or later, an additional void began to develop behind the middle section of the seawall (Photos 21 and 22, Figure A4). The location of this void is directly above a 6.5-foot-deep (horizontal) void extending beneath the concrete keyway at the bottom of the original triangular gravity mass wall. As these voids continue to extend landward beyond the more resilient concrete face and into the weaker formation, erosion from wave energy accelerates, eventually leading to the observed slumping and collapse of the fill soils above/behind the Fred Schott repairs.

4. Beyond the downcoast end of the seawall, a southwesterly trending headland extends from the western end of Margo Dodd Park. The headland has a number of developing sea caves and notches, varying between 4 and 12 feet in depth from the dripline. Based on our review of historic photographs, it is difficult to determine if these sea caves have experienced significant growth over the last 50 years.

Overall, and regardless of the alternatives or additional beach access locations that the City ultimately decides upon, it is our opinion that this seawall should be made a priority for rehabilitation as soon as feasible to help preserve its vital function. Also, and in consideration of the type of repairs that would be involved, including contractor ingress/egress and staging and phasing (disturbance footprint), it is our opinion that this repair work would be an ideal opportunity for the City to add formal public beach access in the vicinity of Margo Dodd Park for the following reasons:

1. There exists double the amount of available parking opportunities downcoast and nearer the Margo Dodd Park seawall, and the public already navigates a number of unofficial, and arguably unsafe, bluff-top paths to access this area, further legitimizing the need for developing additional official access in this location.

2. It would facilitate achieving the previously discussed goals of the California Coastal Commission to provide public beach access at regular intervals along the coastline.

3. While arguably a maintenance project, adding a public access component to the repair work should help facilitate regulatory approvals needed to repair the wall.

Council Agenda 11-15-2022 12.B-10
Attachment 1
Packet Page 179

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 11

4. Enhances the attributes and functionality of Margo Dodd Park.

5. Access along the top of the Margo Dodd seawall would provide a long and wide intermediate bluff landing that may be an attractive alternative to the steep, narrow, and circuitous Pier Avenue stairway, and may be more desirable for kayak/paddle board portage, where there exists a larger available staging area at the top-of-bluff in the park.

6. Adding a walkway with a pedestrian parapet and wave deflector also enhances the wall for wave overtopping and sea level rise, providing improved protection for the fill slope above the wall and Ocean Boulevard.

ANTICIPATED FUTURE SITE CONDITIONS

Past and possible future changes in mean sea level (MSL) are of interest in design and planning for coastal projects, with the subject beach access stairway project being no exception. Global mean sea level rose at least 300 feet, and perhaps as much as 400 feet, during the past 18,000 years or so (CLIMAP, 1976). Exhibit 7 shows the relative sea level trend observed at the Port San Luis Tide Gauge from 1945 to 2021. These data are routinely tabulated by the National Oceanic and Atmospheric Administration (NOAA) as part of their national tide gauging program (Flick et al., 2003). The sea level trend from 1945 through 2021 has been relatively linear over the past century, with the relative sea level trend of 0.97 mm per year equivalent to a change of 0.32 foot in 100 years.

EXHIBIT 7: Relative Sea Level Trend for Port San Luis, 1945-2021 (Source: NOAA, 2021).

While mean sea level rise (MSLR) has increased linearly at a relatively slow rate over the past century, it is generally concluded that MSLR will likely accelerate along the California coast over the next few decades (OPC, 2018). The Ocean Protection Council’s (OPC’s) 2018 update to the State of California Sea-Level Rise Guidance document offers a new strategy for presenting MSLR trajectories as functions of emission scenarios as well as probability of occurrence. For example, for Port San Luis, the low-emissions 2100 endpoint value of 1.3 feet of MSLR has a 50 percent chance of being exceeded, while the corresponding high-emissions 2100 endpoint is 2.1 feet. For additional perspective, the low-emissions 2100 MSLR value has a 66 percent chance of rising between 0.7 and 2.1 feet, while the high-emissions range suggests 1.3 to 3.1 feet. Notably, there is a 5 percent chance that MSLR will be 2.9 feet (low) or 4.1 feet (high) by 2100, and a 0.5 percent chance of 5.4 feet (low) or 6.7 feet (high). Finally, the extreme scenario postulates 9.9 feet MSLR by 2100 in case of rapid Antarctic ice loss (see Exhibit 8).

Council Agenda 11-15-2022 12.B-11
Attachment 1
Packet Page 180

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 12

EXHIBIT 8: Projected Sea-Level Rise for Port San Luis (Source: Table 19, OPC, 2018).

Council Agenda 11-15-2022 12.B-12
Attachment 1
Packet Page 181

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 13

Minimally, it should be anticipated that any increase in sea level will result in increased rates of coastal erosion and a narrowing of the available beach. While annualized erosion rates for the subject area over the past 20 years appear to be on the order of 0.1 to 0.2 foot per year, we anticipate that erosion rates may double over the next few decades, particularly given the observed steepening of the bluff face.

Given the preceding, we have developed the following stairway alternatives for the City’s use in the further evaluation of providing and maintaining coastal access to this heavily utilized area.

PIER AVENUE STAIRWAY ALTERNATIVES

Option 1 – Temporary Repairs to Existing Stairway

Option 1 involves implementing the minimum interim temporary repair measures necessary to reopen the Pier Avenue stairway to the public (Figure 4). The most significant component of this repair consists of installing a single 4-foot-diameter, steel-reinforced concrete pier extending from the middle of the partially unsupported third landing down into the underlying shore platform bedrock. Logistically, this likely involves temporarily shoring in-place the second and third flight of stairs before detaching/dismantling the third landing; excavating and scaling approximately 20 feet of overhanging fractured and loose formational material within the mid-bluff shelf to create a clear unobstructed vertical space and a safe work area; placing a reinforcing cage into the drilled hole; placing a sonotube up to within a couple feet of the bottom of the landing; pumping concrete; and subsequently structurally connecting the landing to the new pier.

The City should also:

1. Preemptively excavate/scale and lay back the surrounding tall bluff above the bottommost Landing 5 and Flights 3 and 4, and repair the storm-displaced existing lower stainless steel flight with new foundations.

2. Have our structural engineer observe the condition of the structural connections at each of the flights and landings to determine if any other maintenance repairs should be completed as part of this work.

3. Determine if any other code upgrades become necessary as part of completing interim repairs.

Given the age of the overall structure it might be prudent to also consider installing drilled piers at Landings 4 and 5 in lieu of reattaching the bent flight to the existing shallow foundations for the interim.

Option 2 – Replace Stairway within Existing Alignment

Option 2 involves new deepened foundations at all of the landings and an entirely new stairway system that could consist of a combination of either stainless steel or possibly FRP (Fiber Reinforced Polymer) at the top of the bluff, and transitioning to reinforced concrete (with a solid parapet and wave deflector) when the flights and landings descend below approximately elevation 30 feet NAVD 88 within the wave runup and impact zone. The deepened foundations are intended to provide long-term survivability of the stairway access as additional erosion and bluff failures Council Agenda 11-15-2022 12.B-13
Attachment 1
Packet Page 182

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 14

continue to reduce the size of the existing headland in which the stairway currently rests. While FRP has clear advantages for corrosion resistance, lower cost, and lightweight properties, we cannot endorse implementing FRP within the wave impact zone due to longshore transient sediment abrasion issues. Additionally, it remains uncertain to us if FRP implemented above the wave impact zone would withstand the intense public use of this area (e.g., top rail being used as a sliding surface to help portage heavy plastic kayaks down to the beach).

While we generally prefer to not have an open railing surface within the wave impact zone, the existing robust stainless steel (Flight 4) has performed well at this location, suggesting the continued use of robust stainless steel. Also, and in lieu of having a solid concrete pedestrian parapet with a wave deflector within the wave impact zone, this option could include strategically placing a couple of 8-ton rocks or faux carved and colorized concrete rocks embedded into the formational shore platform at or slightly above the High Tide Line (6.85 feet NAVD 88; Exhibit 9), possibly mitigating the need for a solid parapet, but also allowing the existing bottom landing to remain aligned in the current position. Also, these real or fake rocks would benefit the area by dissipating wave energy within the cove and protect anyone caught unaware in the wave runup zone near the bottom landing.

EXHIBIT 9: Example of faux rocks we have designed and implemented at a limited- access site to reduce wave energy impacting a nearby walkway, Sunset Cliffs area, San Diego (Source: ENGEO, April 2022)

Note that we only recommend the implementation of faux rocks for limited access sites when it is cost-prohibitive to mobilize large equipment needed to place so few rocks. Given that a crane would likely be needed for the minimum repairs, and that pumped concrete is also a component of the work, the City has the option for either real or faux rocks should this be desired for the Pier Avenue stairway. Negating cost comparisons, the faux rocks may be more desirable in that they can be in-situ custom-shaped for the appropriate anchorage and wave baffling effect, and would Council Agenda 11-15-2022 12.B-14
Attachment 1
Packet Page 183

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 15

also blend in with the surrounding natural formational outcrops. Otherwise, large rocks that would be obtained from a quarry and placed with a crane should likely be hand-selected for similar favorable attributes. Option 2 also renews the service life of the stairway on the order of 40+ years with regular maintenance.

With either option, there is still a concern over public safety. If the landings are located or rotated toward the back beach, then additional stabilization measures will likely be necessary to mitigate rockfall and bluff collapse. With regard to opening handrails in the presence of kelp wrack and debris (which can accumulate on an open railing system), high wave loads on this accumulated debris can destroy the railing system. Recognizing that these loads can be very high, we have determined that solid concrete parapets in the lower flights are preferred to help mitigate both the wave impact safety hazard and reduce the available surface area in which kelp and debris can attach/accumulate. That is not to say that we believe the existing stainless steel lower flight needs to be replaced, as it appears to have performed well in this environment despite being bent and dislocated from the footings. However, this recent damage illustrates the high periodic wave forces acting on these structures.

MARGO DODD PARK AND SEAWALL STAIRWAY ALTERNATIVES

Option 3 – New Stairway with Beach Access from Margo Dodd Park

Option 3 involves construction of an additional public beach access stairway downcoast of Pier Avenue near the entrance of Margo Dodd Park (Figure 6). The stairway would be incorporated into the previously discussed Margo Dodd seawall repairs, and outlet onto the beach immediately upcoast and behind the existing headland having two existing sea caves (Exhibit 10).

Council Agenda 11-15-2022 12.B-15
Attachment 1
Packet Page 184

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 16

EXHIBIT 10: Stairway Landing Area, Options 3 and 4, prior to bluff failure - arrows point to approximate area (Source: ENGEO, March 27, 2022)

While the beach at this location is relatively narrow, it is less exposed to direct wave energy when compared to the exposure at the Pier Avenue stairway, as shown previously on Exhibit 4.

However, the adjacent steep formational bluff is vulnerable to collapse, as shown on Exhibit 11.

Although there has been a bluff failure at this location, we would recommend that additional bluff scaling is still warranted, particularly to create a buffer for the bottommost stairway landing originating from the top of the repaired Margo Dodd seawall. With the introduction of a stairway over the unofficial trail, we would also recommend infilling of the two sea caves within this headland to minimize public safety/nuisance issues, and also to revitalize the natural protection to the bottom section of the stairway shown on Figure 6.

Council Agenda 11-15-2022 12.B-16
Attachment 1
Packet Page 185

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 17

EXHIBIT 11: Stairway Landing Area, Options 3 and 4, subsequent to bluff failure that occurred between March 27 and May 18, 2022 (Source: ENGEO, May 18, 2022)

To rehabilitate the seawall and incorporate a stairway and walking path, we would suggest the following measures (as conceptually shown on Figures 6 and 7):

1. Filling the voids along the front face of the existing wall beneath the keyway and bedrock shore platform with an estimated 30 cubic yards of pumpable 3-sack slurry or controlled low strength material (CLSM).

2. Sawcutting, demolishing, and removing the existing wave deflector atop the 1991 Fred Schott wall repairs.

3. Placing approximately 275 cubic yards of a 5,000 psi shotcrete tied-back structural skin over both the original triangular mass concrete gravity wall and the Fred Schott repairs, keyed into the formational shore platform a minimum of 2 feet, and extending vertically above the top of the existing wall an additional 5 feet to form a new parapet and wave deflector (see Figure 7). At this time, we estimate that this would likely include two rows of tiebacks spaced 10 feet on center, horizontally and vertically, over the entire length of the existing wall (approximately 150 feet), totaling 30 tiebacks.

4. Placing approximately 165 cubic yards of 12-inch-thick carved and colorized architectural sculptor coating over the structural skin.

5. Infilling the existing sea cave at the downcoast end of the wall with an estimated 20 cubic yards of pumpable 3-sack slurry or CLSM. This includes removal of all transient sand and loose cobble from the floor of the sea cave (to be left on the beach) prior to infilling.

Council Agenda 11-15-2022 12.B-17
Attachment 1
Packet Page 186

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 18

Depending upon contractor means and methods, work to infill the sea cave may also require temporary shoring of the outside face of the sea cave to allow for worker safety.

6. Backfilling and compacting the large void behind the downcoast end of the seawall with on the order of 100 to 150 cubic yards of 3-sack slurry or CLSM, along with the small void behind the middle portion of the seawall with approximately 10 cubic yards of 3-sack slurry or CLSM.

7. Infilling the larger, more landward sea cave associated with the westerly extending headland at the upcoast end of the seawall with an estimated 150 cubic yards of 3-sack slurry or CLSM. We would also recommend including integral color or applying an architecturally carved and colorized surface to any exposed faces of the slurry or CLSM to blend the appearance with the adjacent natural formational outcrops. This would include infilling the smaller, more seaward sea cave associated with the westerly trending headland with an estimated 40 cubic yards of slurry or CLSM, totaling 190 cubic yards.

8. Removing the existing elevated upcoast section of the headland that the seawall is tied into to prevent the walking path from going up and then down, and to allow for westerly drainage resulting from slope runoff or wave splash/overtopping.

9. Constructing an approximately 1,720-square-foot new variable-width concrete walking surface with seat wall along the top perimeter of the wall totaling approximately 120 cubic yards.

10. Installing two new sections of pile-supported stainless steel stairway on either end of the rehabilitated Margo Dodd seawall. At this time, there is insufficient topographic information from which to prepare representative concepts for the stairs, recognizing that building codes require that landings be placed vertically not more than every 12 feet, and also distributed equally along the alignment.

11. Scale and lay back the steep bluff in proximity to the bottommost stairway se ction on the beach.

Option 4 – New Stairway with Beach Access from Palisade Avenue

Option 4 is similar to Option 3, except that the entrance to the new stairway would start across from Palisade Avenue (Figure 8) instead of at Margo Dodd Park. For this option, we suggest that the stairway be on-grade at this location given the proximity to the retreating bluff that we are recommending for further scaling, which may eventually require alteration of the alignment to accommodate additional erosion in this area. One possible advantage of this option is that the upper portion of the stairway would provide a more gradual and natural descent down this portion of the bluff, providing a more visually and physically comfortable user experience when compared to Option 3. One disadvantage of this option is that the entrance is not as favorable for accommodating congregating when compared with the Margo Dodd Park access.

Council Agenda 11-15-2022 12.B-18
Attachment 1
Packet Page 187

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 19

GENERAL RECOMMENDATIONS

1. Possibly on an emergency basis, the City might consider scaling the tall and overhanging bluff encircling the cove where the Pier Avenue stairway exists, and place all excavated materials within the cove and on the beach above the HTL.

2. Implement the minimum necessary repairs to enable reopening the Pier Avenue Stairway, including:
a. Inspect all existing structural connections at landings and flights, and determine suitability for continued use (e.g., maintenance repairs to treads and galvanized railings where applicable).
b. Construct drilled pier at Landing 3.
c. Consider adding two additional drilled piers at Landings 4 and 5. d. Reattach/anchor stainless section (Flight 4) to new piers. e. Consider strategically placing three to four 8-ton rocks (or faux rock) in front of Flight 4 and Landing 5.

3. In parallel, develop and permit repair plans for the Margo Dodd seawall rehabilitation incorporating additional new public beach access at Margo Dodd Park and along the top of the seawall down to the beach behind the headland, including infilling of the sea caves and scaling the nearby bluff.

In consideration of the currently estimated construction costs for the options discussed below, notably the high costs associated with what are arguably temporary repairs to the Pier Avenue Stairs (due to the challenging site conditions), it might be more appropriate for the City to focus on the significant repairs that are needed for the Margo Dodd Seawall, and incorporate improved public access as part of that work. If that is the direction the City ultimately decides upon, we would then suggestion demolition and removal of the existing stairway, costs for which are outlined below.

PRELIMINARY CONSTRUCTION COST ESTIMATES

Based on our prior construction-related experience, we contacted J.C. Baldwin Construction (information below), who specializes in limited-access coastal stabilization and construction projects, to discuss the site constraints and stairway repair and replacement alternatives.

J.C. Baldwin Construction
Paul McKee and Danny Cohen
2469 Impala Drive, Carlsbad CA 92010
Website: http://jcbaldwin.com
Phone: (760) 438-9274

J.C. Baldwin Construction provided preliminary (rough order of magnitude) cost estimates for the five stairway options as shown in Table 1. The cost estimates are based upon providing this letter and figures to the contractor, along with a phone call to discuss the background information and drawings.

Council Agenda 11-15-2022 12.B-19
Attachment 1
Packet Page 188

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 20

TABLE 1: Preliminary Construction Cost Estimates
Stairway Alternative
Preliminary
Construction Cost
Estimate
Option 1 $1,500,000
Option 2 $2,350,000
Option 3 $4,800,000
Option 4 $5,200,000
Demo & Remove
Existing Pier Ave
Stairway
$360,000

With respect to contractor selection, there exists a multitude of potential contractors (large and small) from which bids could be solicited. However, this type of work is highly specialized, involving work within a fluctuating marine, tidally influenced environment that is prone to wave impacts, variable site conditions, and unstable bluffs. As a result, the selected contractor will need to be able to anticipate problems that will arise throughout the duration of the project. This includes work in a corrosive (saltwater) beach environment, dynamic wet conditions, additional site safety measures (such as temporary shoring), and shortened work days due to unfavorable tides limiting access to areas of work, which routinely slow progress, increasing the time and costs to complete a project.

With respect to construction costs, construction activities for all types of projects have remained at a heightened level during the entirety of the COVID-19 pandemic. As a result, price increases are being reported by contractors and material suppliers associated with not only increased demand for construction materials, but also limited availability of inventory due to past disruptions (complete stoppage in some cases) in manufacturing and delivery supply chains. Contractors are also reporting that typical price guarantees (fixed pricing) on material quotes are being removed from estimates, further contributing to uncertainty in overall project costs.

While we have done much preliminary work to help estimate the anticipated construction costs, there remains additional detailed design work that would need to be completed should you decide to proceed with the recommended repairs, including:

1. Obtain detailed topographic site surveys at both Pier Avenue and Margo Dodd Park and seawall.

2. Prepare a formal geotechnical report, including a more detailed discussion on sea level rise.

3. From topographic survey data, evaluate rise and run of new flights of stairway sections to optimize the configuration and alignment.

4. Develop site-specific sand mitigation fee calculations.

Council Agenda 11-15-2022 12.B-20
Attachment 1
Packet Page 189

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 21

5. Prepare supporting structural calculations and detailing.

6. Develop formal design plans for permitting and contractor bidding.

7. Perform preliminary environmental site reviews for (avoidance of) cultural resources and possibly old dump/burn pits.

LIMITATIONS AND CONDITIONS OF USE

This document is intended to provide the City of Pismo Beach with a preliminary understanding and overview of site conditions, and alternatives for possible repairs and opportunity for additional points of public beach access, including preliminary (order of magnitude) estimates of potential construction costs for the various alternatives presented. As such, it should be anticipated that the information and order of magnitude probable costs are subject to change, particularly given the absence of detailed topographic survey data.

We strived to perform our professional services in accordance with generally accepted principles and practices currently employed in the area; there is no warranty, express or implied. Risks of earth movement are inherent of development within the coastal environment, and it should be expected that there will continue to be changes to the site, which may be sudden and episodic.

As we are unable to eliminate all risks, we cannot guarantee or warrant the results of our services.

CLOSING

If you have any questions or comments regarding this letter, please call and we will be glad to discuss them with you.

Sincerely,

ENGEO Incorporated

Gene Spineto Walter F. Crampton, GE, D.CE
Senior Project Manager Principal

gds/wfc/crh/jg

Attachments: Select References
Figures
Appendix A – Site Photographs

Council Agenda 11-15-2022 12.B-21
Attachment 1
Packet Page 190

City of Pismo Beach 19892.000.001
Pier Avenue Stairs November 4, 2022
ALTERNATIVES ANALYSIS Page 22

SELECT REFERENCES

Bromirski, P.D., A.J. Miller, R.E. Flick, and G. Auad, 2011, Dynamical Suppression of Sea Level Rise Along the Pacific Coast of North America: Indications for Imminent Acceleration, J.

Geophys. Res. C., 116, C07005.

CLIMAP, 1976, The Surface of the Ice-Age Earth, Science, 191, 1131-1137.

Flick, R.E., Murray, J.F., and Ewing, L.C., 2003, Trends in United States Tidal Datum Statistics and Tide Range, J. Waterway, Port, Coastal and Ocean Eng., Amer. Soc. Civil Eng., 129(4), 155-164.

Fugro West, Inc., April 24, 2002, 1992 Bluff Erosion Study Update, Private Lots, North Cypress Street to Bluff Drive, Pismo Beach, California.

NOAA, Tides & Currents, Tides/Water Levels website,
https://tidesandcurrents.noaa.gov/sltrends/sltrends_station.shtml?id=9412110 accessed on 4/21/2022.

Ocean Protection Council, 2018, State of California Sea-Level Rise Guidance, 2018 Update, https://opc.ca.gov/webmaster/ftp/pdf/agenda_items/20180314/Item3_Exhibit- A_OPC_SLR_Guidance-rd3.pdf

Wiegers, M.O., 2011, Preliminary Geologic Map of the Pismo Beach 7.5’ Quadrangle, San Luis Obispo County, California, published by the California Geological Survey.

Council Agenda 11-15-2022 12.B-22
Attachment 1
Packet Page 191

19892.000.001
November 4, 2022

FIGURES

Figure 1 – Vicinity Map with Beach Access Stairways
Figure 2 – Overall Site Plan – Pier Avenue & Margo Dodd Park Figure 3 – Geologic Map
Figure 4 – Option 1 - Temporary Repairs to Existing Stairway Figure 5 – Option 2 – Replace Existing Stairway
Figure 6 – Option 3 - Beach Access from Margo Dodd Park Figure 7 – Seawall Rehabilitation – Section
Figure 8 – Option 4 - Beach Access from Margo Dodd Park

Council Agenda 11-15-2022 12.B-23
Attachment 1
Packet Page 192

Council Agenda 11-15-2022 12.B-24
Attachment 1
Packet Page 193

Council Agenda 11-15-2022 12.B-25
Attachment 1
Packet Page 194

Council Agenda 11-15-2022 12.B-26
Attachment 1
Packet Page 195

Council Agenda 11-15-2022 12.B-27
Attachment 1
Packet Page 196

Council Agenda 11-15-2022 12.B-28
Attachment 1
Packet Page 197

Council Agenda 11-15-2022 12.B-29
Attachment 1
Packet Page 198

Council Agenda 11-15-2022 12.B-30
Attachment 1
Packet Page 199

Council Agenda 11-15-2022 12.B-31
Attachment 1
Packet Page 200

19892.000.001
November 4, 2022

APPENDIX A – SITE PHOTOGRAPHS

Figure A1 – Photos of Existing Stairway Condition
Figure A2 – Photos Upcoast of Stairway
Figure A3 – Photos of Sea Caves near Margo Dodd Seawall Figure A4 – Photos of Margo Dodd Seawall

Council Agenda 11-15-2022 12.B-32
Attachment 1
Packet Page 201

PHOTO 1 - SUSPENDED SUPPORT LEG AND FOOTING PHOTO 2 - SUPPORT LEGS SHEARED OFF OF FOOTINGS PHOTO 3 - SPALLING CONCRETE AND EXPOSED REBAR IN

FOOTING
PHOTO 4 - CORRODING RAILING AND BALUSTERS
PHOTO 5 - SPALLING CONCRETE TREADS PHOTO 6 - LOOSE SCREWS AND GRAFFITI

PHOTOS OF EXISTING STAIRWAY CONDITION

PIER AVENUE STAIRS

PISMO BEACH, CALIFORNIA
PROJECT NUMBER: 19892.000.001
SCALE: NO SCALE
DRAWN BY: CRH CHECKED BY: WFC
FIGURE NO.

A1

ORIGINAL FIGURE PRINTED IN COLOR
CO
P
Y
R
I
G
H
T

@
2 0
2 2

B
Y

E
N
G
E
O

I
N
C
O
R
P
O
R
A
T
E
D
.

T
H
I
S

D
O
C
U
M
E
N
T

M
A
Y

N
O
T

B
E

R
E
P
R
O
D
U
C
E
D

I
N

W
H
O
L
E

O
R

I
N

P
A
R
T

B
Y

A
N
Y

M
E
A
N
S

W
H
A
T
S
O
E
V
E
R
,

N
O
R

M
A
Y

I
T

B
E

Q
U
O
T
E
D

W
I
T
H
O
U
T

T
H
E

E
X
P
R
E
S
S

W
R
I
T
T
E
N

C
O
N
S
E
N
T

O
F

E
N
G
E
O

I
N
C
O
R
P
O
R
A
T
E
D
.

Council Agenda 11-15-2022 12.B-33
Attachment 1
Packet Page 202

PHOTO 7 - NOTCHES EXTENDING UNDER BLUFF PHOTO 8 - NOTCH EXTENDING UNDER BLUFF PHOTO 9 - FIRST NOOK/RECESS PHOTO 10 - SECOND NOOK/RECESS PHOTO 11 - THIRD NOOK/RECESS PHOTO 12 - COLLAPSED ROCK IN THIRD NOOK/RECESS

PHOTOS UPCOAST OF STAIRWAY

PIER AVENUE STAIRS

PISMO BEACH, CALIFORNIA
PROJECT NUMBER: 19892.000.001
SCALE: NO SCALE
DRAWN BY: CRH CHECKED BY: WFC
FIGURE NO.

A2

ORIGINAL FIGURE PRINTED IN COLOR
CO
P
Y
R
I
G
H
T

@
2 0
2 2

B
Y

E
N
G
E
O

I
N
C
O
R
P
O
R
A
T
E
D
.

T
H
I
S

D
O
C
U
M
E
N
T

M
A
Y

N
O
T

B
E

R
E
P
R
O
D
U
C
E
D

I
N

W
H
O
L
E

O
R

I
N

P
A
R
T

B
Y

A
N
Y

M
E
A
N
S

W
H
A
T
S
O
E
V
E
R
,

N
O
R

M
A
Y

I
T

B
E

Q
U
O
T
E
D

W
I
T
H
O
U
T

T
H
E

E
X
P
R
E
S
S

W
R
I
T
T
E
N

C
O
N
S
E
N
T

O
F

E
N
G
E
O

I
N
C
O
R
P
O
R
A
T
E
D
.

Council Agenda 11-15-2022 12.B-34
Attachment 1
Packet Page 203

PHOTO 13 - VIEW OF SEA CAVES LOOKING EAST PHOTO 14 - VIEW OF SEA CAVES LOOKING NORTH PHOTO 15 - VIEW OF SEA CAVES LOOKING NORTH PHOTO 16 - VIEW OF SEA CAVES INCLUDING SEAWALL

PHOTOS OF SEA CAVES NEAR MARGO DODD SEAWALL

PIER AVENUE STAIRS

PISMO BEACH, CALIFORNIA
PROJECT NUMBER: 19892.000.001
SCALE: NO SCALE
DRAWN BY: CRH CHECKED BY: WFC
FIGURE NO.

A3

ORIGINAL FIGURE PRINTED IN COLOR
CO
P
Y
R
I
G
H
T

@
2 0
2 2

B
Y

E
N
G
E
O

I
N
C
O
R
P
O
R
A
T
E
D
.

T
H
I
S

D
O
C
U
M
E
N
T

M
A
Y

N
O
T

B
E

R
E
P
R
O
D
U
C
E
D

I
N

W
H
O
L
E

O
R

I
N

P
A
R
T

B
Y

A
N
Y

M
E
A
N
S

W
H
A
T
S
O
E
V
E
R
,

N
O
R

M
A
Y

I
T

B
E

Q
U
O
T
E
D

W
I
T
H
O
U
T

T
H
E

E
X
P
R
E
S
S

W
R
I
T
T
E
N

C
O
N
S
E
N
T

O
F

E
N
G
E
O

I
N
C
O
R
P
O
R
A
T
E
D
.

Council Agenda 11-15-2022 12.B-35
Attachment 1
Packet Page 204

PHOTO 17 - VIEW OF WESTERN END OF WALL PHOTO 18 - VIEW OF EASTERN END OF WALL PHOTO 19 - TYPICAL VOID BETWEEN CONCRETE KEYWAY AND

SHORE PLATFORM
PHOTO 20 - VOID AT DOWNCOAST END OF WALL
PHOTO 21 - VOID IN MIDDLE OF WALL PHOTO 22 - VIEW OF SEAWALL FROM MARGO DODD PARK

PHOTOS OF MARGO DODD SEAWALL

PIER AVENUE STAIRS

PISMO BEACH, CALIFORNIA
PROJECT NUMBER: 19892.000.001
SCALE: NO SCALE
DRAWN BY: CRH CHECKED BY: WFC
FIGURE NO.

A4

ORIGINAL FIGURE PRINTED IN COLOR
CO
P
Y
R
I
G
H
T

@
2 0
2 2

B
Y

E
N
G
E
O

I
N
C
O
R
P
O
R
A
T
E
D
.

T
H
I
S

D
O
C
U
M
E
N
T

M
A
Y

N
O
T

B
E

R
E
P
R
O
D
U
C
E
D

I
N

W
H
O
L
E

O
R

I
N

P
A
R
T

B
Y

A
N
Y

M
E
A
N
S

W
H
A
T
S
O
E
V
E
R
,

N
O
R

M
A
Y

I
T

B
E

Q
U
O
T
E
D

W
I
T
H
O
U
T

T
H
E

E
X
P
R
E
S
S

W
R
I
T
T
E
N

C
O
N
S
E
N
T

O
F

E
N
G
E
O

I
N
C
O
R
P
O
R
A
T
E
D
.

Council Agenda 11-15-2022 12.B-36
Attachment 1
Packet Page 205

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #12.C

SUBJECT/TITLE:

CONSIDERATION OF FEASIBILITY OF A PERMANENT OUTDOOR DINING STUDY

RECOMMENDATION:

Provide direction to staff on the implementation of an outdoor dining program, if desired.

BACKGROUND:

Throughout the COVID-19 pandemic, one of the City Council’s top priorities was supporting local businesses as they adapted to the ever-changing health crisis. One of the actions the Council took to specifically support local restaurants was to close parking on portions of Pomeroy Avenue, Cypress Street, Shell Beach Road, and Hinds Avenue to allow restaurants to use the public right-of-way for outdoor dining parklets. That program ended on September 30, 2022, and encroachments into the public right-of-way were required to be removed by October 3, 2022.

At the September 20, 2022, City Council meeting, the Council directed staff to return with an agenda item to provide the Council an opportunity to discuss the potential hiring of a consultant to conduct a study regarding the feasibility of a permanent outdoor parklet program, an outdoor dining on private property program, and/or conversion of Pomeroy Street to a public promenade.

Parklets (Outdoor Dining on Public Property)
The Council most recently considered outdoor dining options at its February 1, 2022, meeting. That staff report (Attachment 1) focused primarily on implementation of a parklet program, but contains relevant information to aid in the Council’s current discussion.

In addition to the practical considerations outlined in that report, another consideration is the issue of public perception, such as conflicts that may arise when non-restaurant retailers feel that nearby restaurants benefit disproportionately from the use of public space in the form of outdoor dining. In other cities, retailers have expressed frustrations with restaurants being allowed to utilize parking spaces or otherwise blocking visibility of storefronts. While staff has not received direct reports of this locally, it is potentially a matter for the Council to consider.

If the Council wishes to develop a permanent parklet program, in addition to staff time pursuing Local Coastal Program (LCP) amendments and Coastal Commission approval, costs of approximately $20,000–$30,000 could be incurred for a consultant to develop the permanent parklet design standard and associated policies/best practices.

Outdoor Dining on Private Property
Through the pandemic, restaurants with onsite parking were temporarily permitted to utilize these parking lots for the placement of outdoor dining through the Temporary

12.C-1Council Agenda 11-15-2022
Packet Page 206

Outdoor Dining Area Certification process. This was accomplished by the Council allowing the temporary waiver of onsite parking requirements contained in the Pismo Beach Municipal Code (PBMC) in conjunction with the public health orders from the State and County.

The PBMC dictates the amount of onsite parking required by land use. In general, restaurants are required to have one parking space per 75 square feet of dining and waiting area. Should the Council wish to direct staff to pursue a permanent outdoor dining on private property program, it is anticipated that the program would need to include revisions to the PBMC regarding parking requirements for restaurants and outdoor dining, as well as requiring the payment of parking in-lieu fees.

Pomeroy Avenue Closure
The concept of closing Pomeroy Avenue to vehicular traffic has been raised a number of times over the years. The intent of this closure would be to allow the development of a pedestrian- and publicly-oriented square to allow for outdoor dining and other activities.

Should the Council be interested in pursuing this action, staff would develop a Request for Proposals for a consultant to lead the development of a plan to address the varying aspects of the closure of Pomeroy Avenue, including, but not limited to:
 Vehicular circulation
 Emergency access and response
 Public Works access for maintenance and trash duties
 Loss of parking
 Commercial deliveries
 Public space allocation
 Impacts to coastal resources

Staff anticipates that this type of effort would cost approximately $65,000.

Risk Management
Since the February 1, 2022, City Council meeting, staff has examined the practical and legal issues surrounding the extent of a city’s obligation to reduce risk and liability associated with parklets. In general, the best practices include making these temporary facilities a permanent fixture of the community. This typically includes:
 Structural integration
 Permanent curbing
 Stormwater and draining considerations
 Disabled access
 Permanent utilities
 Fire safety
 Additional liability and insurance costs

A number of these items were identified as needing further research in the February 1, 2022, report. Should the Council direct staff to further consider a permanent program, research would include risk reduction wherever possible.

12.C-2Council Agenda 11-15-2022
Packet Page 207

Conclusion and Recommendation
Outdoor dining has been a topic of discussion by the City Council throughout the COVID- 19 pandemic. While outdoor dining has benefits, it also has tradeoffs. Staff recommends that the City Council provide staff direction regarding the Council’s desire to proceed with any options related to outdoor dining.

FISCAL IMPACT:

There is no additional fiscal impact associated with this report. Direction provided by the Council would result in future fiscal impacts which are undetermined at this time.

ALTERNATIVES:

1. Do not provide direction; defer this matter to the Goal-Setting Workshop in February 2023.

ATTACHMENTS:

1. February 1, 2022, City Council staff report
Submitted by: Meeting Date: November 15, 2022
Matthew Downing, Community Development Director
City Manager Approval:

12.C-3Council Agenda 11-15-2022
Packet Page 208

February 1, 2022 Staff Report

12.C-4Council Agenda 11-15-2022
Attachment 1
Packet Page 209

February 1, 2022 Staff Report

12.C-5Council Agenda 11-15-2022
Attachment 1
Packet Page 210

February 1, 2022 Staff Report

12.C-6Council Agenda 11-15-2022
Attachment 1
Packet Page 211

February 1, 2022 Staff Report

12.C-7Council Agenda 11-15-2022
Attachment 1
Packet Page 212

February 1, 2022 Staff Report

12.C-8Council Agenda 11-15-2022
Attachment 1
Packet Page 213

February 1, 2022 Staff Report

12.C-9Council Agenda 11-15-2022
Attachment 1
Packet Page 214

February 1, 2022 Staff Report

12.C-10Council Agenda 11-15-2022
Attachment 1
Packet Page 215

February 1, 2022 Staff Report

12.C-11Council Agenda 11-15-2022
Attachment 1
Packet Page 216

February 1, 2022 Staff Report

12.C-12Council Agenda 11-15-2022
Attachment 1
Packet Page 217

February 1, 2022 Staff Report

12.C-13Council Agenda 11-15-2022
Attachment 1
Packet Page 218

February 1, 2022 Staff Report

12.C-14Council Agenda 11-15-2022
Attachment 1
Packet Page 219

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #12.D

SUBJECT/TITLE:

TECHNOLOGY MASTER PLAN FOR FY 2023 THROUGH FY 2028

RECOMMENDATION:

Review and approve the City of Pismo Beach Technology Master Plan for FY 2023 through FY 2028.

BACKGROUND:

The City Council included funding in the Fiscal Year (FY) 2020 Adopted Budget to develop an updated Technology Master Plan (TMP). In September 2019, the City issued a Request for Proposals for a firm to prepare a five-year Information Technology Strategic Plan, IT Assessment, and Disaster Recovery Plan. After a thorough evaluation process, the City selected ClientFirst Technology Consulting (ClientFirst) to provide this service.

On December 3, 2019, the City Council approved an agreement with ClientFirst to prepare the Technology Master Plan (TMP) and Disaster Recovery Plan. The majority of the plan was completed prior to the COVID-19 global pandemic beginning in March 2020.

With this significant event, various components of the City’s technology solutions were implemented to provide employees with remote working capabilities, virtual meetings, more services delivered online at a faster rate than anticipated, and several new cybersecurity initiatives that became a requirement in order to remain insured. As such, City staff paused the TMP until the rapid pace of implementing technology slowed and decisions about cybersecurity requirements were better defined. In 2022, City staff picked the TMP back up and ClientFirst worked with representatives from all aspects of City operations and management staff to update and finalize the TMP (Attachment 1).

Why Does the City Need a Technology Master Plan?
The City went through its first Five-Year Technology Master Plan, which was developed by a consultant, prioritized at the Department Head level, and adopted and funded by the City Council. That Five-Year Technology Master Plan was highly successful, moving the City from basic operations to a fully robust technology infrastructure with updated virtual servers, cloud solutions, improved security, improved backup storage, increased bandwidth to allow for cloud storage and increasing internet communication, fully capable on-line payment options, improved technology governance, and automated software solutions.

As technology is more accepted by the public and required with various agencies and vendors, IT projects are popular solutions to help City staff handle increasing requirements with a limited amount of time and resources. With numerous initiatives from various departments, there is a need to help prioritize the needs of all the various Department requests. In addition, the City’s technology efforts must continue to evolve in the technology world’s fast-changing environment and there is a need to help ensure that technology is meeting best practices. Finally, while the City does have redundant backup solutions with off-site and cloud storage, in the event of a cybersecurity attack or physical

12.D-1Council Agenda 11-15-2022
Packet Page 220

disaster, the City does not have a formal Disaster Recovery Plan that is accepted by the Council and staff based on a risk tolerance level.

Technology Master Planning Process
The Technology Master Planning process is intended to capture all the various technology needs for the City for the next five years. The first step included taking an inventory of all the City’s technology and identifying the key stakeholders. Then, ClientFirst held interviews with various Departments’ staff to determine needs, strategies, goals, and objectives. Third, ClientFirst developed preliminary initiatives and projects based on staff recommendations, research, and alternative solutions. On August 23, 2022 the Technology Steering Committee (City Manager and Department Heads) met with ClientFirst to plan and prioritize the various IT initiatives. Since that date, ClientFirst put together an estimated budget by fiscal year based on the prioritization meeting, which has been reviewed by the Technology Steering Committee. In parallel, ClientFirst met with IT staff in the City to develop technology best practices for operations, governance, infrastructure, and other needs to support the backbone of the City. The result of this work is the TMP.

Report: Technology Master Plan – November 2022
The TMP (Attachment 1) includes the purpose and background of the document, including a technology assessment, strategies, goals, and objectives, key issues and initiatives, and various IT and Departmental initiatives, and a budget and prioritization plan.

Key Initiatives
There are 43 initiatives in the TMP that are recommended to be funded and implemented over five and a half years from FY 2023 to FY 2028. These initiatives include projects that came out of the interviews with City staff and where the City needs to go to meet best practices, and the IT operations, infrastructure, telecommunication, and IT staffing needed to support the City staff. Finally, the initiatives include cybersecurity initiatives to meet requirements of the City’s insurance provider. Below is a list of some of the key initiatives in the TMP, where the details and the proposed budget can be found in the TMP.

Departmental Applications and Systems
 Land Management System gap analysis and improvements
 Management of digital evidence and storage requirements  Police scheduling and time tracking system
 Enterprise Asset Management system improvements

Smart Cities
 Automated Water Meter reading
 Smart parking (meter and management)
 Downtown public and staff wi-fi

IT Infrastructure

12.D-2Council Agenda 11-15-2022
Packet Page 221

 Replacing workstations on a 4-year cycle
 Wi-fi mesh downtown network, largely for Police and Tourism  Radio upgrades, redundant connection to Public Safety Facility, increase signal strength to support public safety needs
 Internet bandwidth to support applications
 Facility access and security cameras; additional disk storage to meet legal requirements

Cybersecurity
 City Hall and Police Station backups to restore in 24 hours  Multi-factor authentication
 SCADA security improvements to meet requirements of federal law  Managed detection and response solution to meet requirements  Records and data retention to include electronic records and data

Disaster Recovery Plan
City staff are also working with ClientFirst on a Disaster Recovery Plan, which has been split into a Staff-facing IT Incident Response Plan, which will be shared internally and provided as a mandatory training to City staff, and a Cybersecurity Incident Response Plan which outlines IT actions in the event of an incident. These documents will serve as important action plans in the event of a malware, ransomware, or other cybersecurity incident.

Return on Investment
The City has grown very quickly in the past 10 years in terms of its budget and technology requirements. Currently, the City spends about 2.31% of its operating budget on IT operations. This is below the recommended low benchmark of 3.0%, where the average is 3.82% for similar-sized municipalities. Investments in technology help City staff perform their duties more efficiently and have proven to reduce the number of operational staff needed. In order to maintain level staffing for most of the past decade, staff has used technology to keep up with demand. Each initiative in the proposed TMP provides more tools for staff to be more efficient with their time. For example, upgrading the radio system that supports Police, Water, and Wastewater SCADA systems, and Public Works field workers is critical for their communications and the safety of the public and its water and wastewater system. Implementation of the recommended upgrades would support the ability to help support improved radio coverage and would better support the incident command system, E911 radio dispatch, officer safety, public safety, coordinated support for emergency responders, etc.

Conclusion and Recommendation
Staff recommends that Council review and approve the City of Pismo Beach Technology Master Plan for FY 2023 through FY 2028 (Attachment 1).

FISCAL IMPACT:

The fiscal impact of approving the attached TMP for FY 2023 and FY 2028 includes a commitment to providing sufficient funding for various initiatives laid out in the document.

12.D-3Council Agenda 11-15-2022
Packet Page 222

FY 2023 includes $554,150 of projects, of which, $481,621 is already budgeted, leaving an additional need of $72,529.

FY 2024 through FY 2028 project budgets are not yet budgeted, and these numbers would be refined through budget development to ensure that these projects can be supported based on all the various priorities of the City’s budget. This includes approximately $4.28 million of additional funding over the next 5 years, or $856 thousand on average per year. Below is a summary of the TMP project funding, which would most likely be included in the City’s Technology Services Fund. This fund is supported by various funding, including approximately 80% from the General Fund and 20% by all other funds.

ALTERNATIVES:

1. Do not approve the Technology Master Plan.

2. Provide staff with alternate direction.

ATTACHMENTS:

1. City of Pismo Beach Technology Master Plan FY 2023 through FY 2028 Prepared by: Meeting Date: November 15, 2022
Nadia Feeser, Administrative Services Director
City Manager Approval:

FY 2023 FY 2024* FY 2025 FY 2026 FY 2027 FY 2028
Initiatives 554,150$ 6,131,150$ 1,093,050$ 1,005,850$ 740,448$ 850,913$ Funding Sources (Funded,
Planned, and/or estimated) 481,621 5,218,200 93,200 43,200 43,200 143,200 Net New Funding 72,529$ 912,950$ 999,850$ 962,650$ 697,248$ 707,713$ *FY 2024 includes an estimated $5 million project for Automated Water Meters that would be included as part of the upc oming Water and Wastewater rate study, planned for Council approval in 2023.

12.D-4Council Agenda 11-15-2022
Packet Page 223

PISMO BEACH COUNCIL AGENDA REPORT
Agenda Item #12.D

SUBJECT/TITLE:

TECHNOLOGY MASTER PLAN FOR FY 2023 THROUGH FY 2028

RECOMMENDATION:

Review and approve the City of Pismo Beach Technology Master Plan for FY 2023 through FY 2028.

BACKGROUND:

The City Council included funding in the Fiscal Year (FY) 2020 Adopted Budget to develop an updated Technology Master Plan (TMP). In September 2019, the City issued a Request for Proposals for a firm to prepare a five-year Information Technology Strategic Plan, IT Assessment, and Disaster Recovery Plan. After a thorough evaluation process, the City selected ClientFirst Technology Consulting (ClientFirst) to provide this service.

On December 3, 2019, the City Council approved an agreement with ClientFirst to prepare the Technology Master Plan (TMP) and Disaster Recovery Plan. The majority of the plan was completed prior to the COVID-19 global pandemic beginning in March 2020.

With this significant event, various components of the City’s technology solutions were implemented to provide employees with remote working capabilities, virtual meetings, more services delivered online at a faster rate than anticipated, and several new cybersecurity initiatives that became a requirement in order to remain insured. As such, City staff paused the TMP until the rapid pace of implementing technology slowed and decisions about cybersecurity requirements were better defined. In 2022, City staff picked the TMP back up and ClientFirst worked with representatives from all aspects of City operations and management staff to update and finalize the TMP (Attachment 1).

Why Does the City Need a Technology Master Plan?
The City went through its first Five-Year Technology Master Plan, which was developed by a consultant, prioritized at the Department Head level, and adopted and funded by the City Council. That Five-Year Technology Master Plan was highly successful, moving the City from basic operations to a fully robust technology infrastructure with updated virtual servers, cloud solutions, improved security, improved backup storage, increased bandwidth to allow for cloud storage and increasing internet communication, fully capable on-line payment options, improved technology governance, and automated software solutions.

As technology is more accepted by the public and required with various agencies and vendors, IT projects are popular solutions to help City staff handle increasing requirements with a limited amount of time and resources. With numerous initiatives from various departments, there is a need to help prioritize the needs of all the various Department requests. In addition, the City’s technology efforts must continue to evolve in the technology world’s fast-changing environment and there is a need to help ensure that technology is meeting best practices. Finally, while the City does have redundant backup solutions with off-site and cloud storage, in the event of a cybersecurity attack or physical

12.D-1Council Agenda 11-15-2022
Packet Page 224

disaster, the City does not have a formal Disaster Recovery Plan that is accepted by the Council and staff based on a risk tolerance level.

Technology Master Planning Process
The Technology Master Planning process is intended to capture all the various technology needs for the City for the next five years. The first step included taking an inventory of all the City’s technology and identifying the key stakeholders. Then, ClientFirst held interviews with various Departments’ staff to determine needs, strategies, goals, and objectives. Third, ClientFirst developed preliminary initiatives and projects based on staff recommendations, research, and alternative solutions. On August 23, 2022 the Technology Steering Committee (City Manager and Department Heads) met with ClientFirst to plan and prioritize the various IT initiatives. Since that date, ClientFirst put together an estimated budget by fiscal year based on the prioritization meeting, which has been reviewed by the Technology Steering Committee. In parallel, ClientFirst met with IT staff in the City to develop technology best practices for operations, governance, infrastructure, and other needs to support the backbone of the City. The result of this work is the TMP.

Report: Technology Master Plan – November 2022
The TMP (Attachment 1) includes the purpose and background of the document, including a technology assessment, strategies, goals, and objectives, key issues and initiatives, and various IT and Departmental initiatives, and a budget and prioritization plan.

Key Initiatives
There are 43 initiatives in the TMP that are recommended to be funded and implemented over five and a half years from FY 2023 to FY 2028. These initiatives include projects that came out of the interviews with City staff and where the City needs to go to meet best practices, and the IT operations, infrastructure, telecommunication, and IT staffing needed to support the City staff. Finally, the initiatives include cybersecurity initiatives to meet requirements of the City’s insurance provider. Below is a list of some of the key initiatives in the TMP, where the details and the proposed budget can be found in the TMP.

Departmental Applications and Systems
 Land Management System gap analysis and improvements
 Management of digital evidence and storage requirements  Police scheduling and time tracking system
 Enterprise Asset Management system improvements

Smart Cities
 Automated Water Meter reading
 Smart parking (meter and management)
 Downtown public and staff wi-fi

IT Infrastructure

12.D-2Council Agenda 11-15-2022
Packet Page 225

 Replacing workstations on a 4-year cycle
 Wi-fi mesh downtown network, largely for Police and Tourism  Radio upgrades, redundant connection to Public Safety Facility, increase signal strength to support public safety needs
 Internet bandwidth to support applications
 Facility access and security cameras; additional disk storage to meet legal requirements

Cybersecurity
 City Hall and Police Station backups to restore in 24 hours  Multi-factor authentication
 SCADA security improvements to meet requirements of federal law  Managed detection and response solution to meet requirements  Records and data retention to include electronic records and data

Disaster Recovery Plan
City staff are also working with ClientFirst on a Disaster Recovery Plan, which has been split into a Staff-facing IT Incident Response Plan, which will be shared internally and provided as a mandatory training to City staff, and a Cybersecurity Incident Response Plan which outlines IT actions in the event of an incident. These documents will serve as important action plans in the event of a malware, ransomware, or other cybersecurity incident.

Return on Investment
The City has grown very quickly in the past 10 years in terms of its budget and technology requirements. Currently, the City spends about 2.31% of its operating budget on IT operations. This is below the recommended low benchmark of 3.0%, where the average is 3.82% for similar-sized municipalities. Investments in technology help City staff perform their duties more efficiently and have proven to reduce the number of operational staff needed. In order to maintain level staffing for most of the past decade, staff has used technology to keep up with demand. Each initiative in the proposed TMP provides more tools for staff to be more efficient with their time. For example, upgrading the radio system that supports Police, Water, and Wastewater SCADA systems, and Public Works field workers is critical for their communications and the safety of the public and its water and wastewater system. Implementation of the recommended upgrades would support the ability to help support improved radio coverage and would better support the incident command system, E911 radio dispatch, officer safety, public safety, coordinated support for emergency responders, etc.

Conclusion and Recommendation
Staff recommends that Council review and approve the City of Pismo Beach Technology Master Plan for FY 2023 through FY 2028 (Attachment 1).

FISCAL IMPACT:

The fiscal impact of approving the attached TMP for FY 2023 and FY 2028 includes a commitment to providing sufficient funding for various initiatives laid out in the document.

12.D-3Council Agenda 11-15-2022
Packet Page 226

FY 2023 includes $554,150 of projects, of which, $481,621 is already budgeted, leaving an additional need of $72,529.

FY 2024 through FY 2028 project budgets are not yet budgeted, and these numbers would be refined through budget development to ensure that these projects can be supported based on all the various priorities of the City’s budget. This includes approximately $4.28 million of additional funding over the next 5 years, or $856 thousand on average per year. Below is a summary of the TMP project funding, which would most likely be included in the City’s Technology Services Fund. This fund is supported by various funding, including approximately 80% from the General Fund and 20% by all other funds.

ALTERNATIVES:

1. Do not approve the Technology Master Plan.

2. Provide staff with alternate direction.

ATTACHMENTS:

1. City of Pismo Beach Technology Master Plan FY 2023 through FY 2028 Prepared by: Meeting Date: November 15, 2022
Nadia Feeser, Administrative Services Director
City Manager Approval:

FY 2023 FY 2024* FY 2025 FY 2026 FY 2027 FY 2028
Initiatives 554,150$ 6,131,150$ 1,093,050$ 1,005,850$ 740,448$ 850,913$ Funding Sources (Funded,
Planned, and/or estimated) 481,621 5,218,200 93,200 43,200 43,200 143,200 Net New Funding 72,529$ 912,950$ 999,850$ 962,650$ 697,248$ 707,713$ *FY 2024 includes an estimated $5 million project for Automated Water Meters that would be included as part of the upc oming Water and Wastewater rate study, planned for Council approval in 2023.

12.D-4Council Agenda 11-15-2022
Packet Page 227

Op
t
i
m
a
l

T
e
c
h
n
o
l
o
g
y

G
u
i
d
a
n
c
e
Technology Master Plan
October 2022
Client Locations
Coast-to-Coast
Practice Locations
California
Illinois
North Carolina
Texas
800.806.3080
www.clientfirstcg.com

12.D-5Council Agenda 11-15-2022
Attachment 1
Packet Page 228

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
2 | 29
Table of Contents
ENGAGEMENT PURPOSE AND BACKGROUND .................................. 3 Technology Master Plan Objective ......................................................................... 3 Deliverables ............................................................................................................ 3 Methodology and Approach .................................................................................... 4 TECHNOLOGY ASSESSMENT SUMMARY .......................................... 5 Overview ................................................................................................................. 5 Current Technology Environment ........................................................................... 6 Key Statistics and Metrics ....................................................................................... 7 TECHNOLOGY STRATEGIES, GOALS, AND OBJECTIVES ................. 11 TECHNOLOGY DECISION-MAKING PRINCIPLES .............................. 15 Vision / Mission Statement ................................................................................... 15 IT INITIATIVE SUMMARIES ............................................................ 16 Introduction ........................................................................................................... 16 IT Initiative Categories .......................................................................................... 16 KEY ISSUES AND INITIATIVES ....................................................... 19 SUMMARY PLAN BUDGET ANALYSIS ............................................ 23 CONCLUSION .............................................................................. 26 Moving Forward .................................................................................................... 26 Benefits ................................................................................................................. 27 Immediate Next Steps .......................................................................................... 27 TECHNOLOGY MASTER PLAN CAPITAL BUDGET ........................... 28

TECHNOLOGY CURRENT STATE ASSESSMENT (PROJECT
INITIATIVES) ........................................................................... 29

12.D-6Council Agenda 11-15-2022
Attachment 1
Packet Page 229

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
3 |29
Engagement Purpose and
Background
Technology Master Plan Objective
The objective of the Technology Master Plan is to develop and articulate a vision for the effective use of technology to support the work of the City, assuring the proper technical resources and organizational structure to effectively manage information technology and the applications utilized by the departments. This plan identifies strategies for developing and implementing technology initiatives and projects in support of the organization’s operational needs. The recommendations in this plan focus on improvements to the City’s IT infrastructure and business applications to make technology more effective in supporting the departments and goals of the organization.

A well-documented plan will guide the IT function and the City’s operational departments over the next several years by planning, procuring, implementing, and managing current and future technology investments, as well as resources related to operational technology and information technology service delivery. The plan is the result of a thorough analysis of the following:
x Interviews and workshops involving all levels of the City’s operational staff,including the management team, end-users, and other stakeholders, while recognizing limited staff availability
x Existing hardware and network infrastructure, staffing, funding, applications, business systems, projects, processes, telecommunications, training, and other investments and resources currently in use by the City
x Identification and prioritization of initiatives and projects to undertake over the next five years
x Identification of the resources required to accommodate current and future technology requirements, such as IT operations and management, legal requirements, cybersecurity requirements, service delivery, cloud computing, staffing, et cetera.

Deliverables
The assessment includes:
x Project Purpose and Background
x Methodology for Implementation and
Maintenance of the Assessment
x Current Technology Environment
Summary
x Key Benchmarking Metrics
x Strategies, Goals, and Objectives
x IT Initiatives (Projects) by Priority
x Key Issues
x Timelines
x IT Plan Budgets

12.D-7Council Agenda 11-15-2022
Attachment 1
Packet Page 230

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
4 |29
Methodology and Approach
The project adopted a five-phase methodology for Technology Master Planning. The phased approach served as the cornerstone of the project, allowing a collaborative process to shape and develop the recommendations.

12.D-8Council Agenda 11-15-2022
Attachment 1
Packet Page 231

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
5 | 29
Technology Assessment Summary
Overview
The City’s major business applications are generally capable of meeting the departments operational requirements. IT infrastructure capital equipment replacement has generally been able to keep up with replacement of critical components prior end-of-life. Cybersecurity needs have increased dramatically over the last three years. The City will be required invest significant resources to meet new cybersecurity insurance requirements and reduce risk. In addition, Public Safety and Public Works have identified several new technology initiatives to improve efficiencies.

Staff have also identified many gaps in the capabilities of the City’s Enterprise Asset Management system. An assessment and gap analysis of the system is recommended to assist in developing a plan to improve system capabilities and usage.

The Transient Occupancy Tax (TOT) is an important revenue source for the City. The current Business License system processes Transient Occupancy Taxes and is cumbersome to use.

This system may require replacement.

Staff realize that updates and improvements to business applications and business processes are necessary to meet the needs of constituents. An increased desire to leverage business applications that serve constituents has resulted in a desire to increase investment in technology, leading to the creation of this plan. We recommend that, over time, detailed assessments and process reviews be undertaken to improve efficiency and resident services in the majority of business applications.

COVID-19 has also increased the demand for flexible communications, technology, and mobile computing. The demand for more flexible working capabilities continues to be strong even as the virus has waned. The City’s existing file sharing methodology must be updated, and staff trained to use tools supporting mobility and collaboration. Improving Microsoft 365 OneDrive and SharePoint adoption rates will provide staff with additional tools that are expected to improve communication and overall productivity.

Over the past three years, cybersecurity threats have increased significantly, requiring government agencies to increase spending on cybersecurity, risk mitigation, and resiliency.

Increased spending to improve core infrastructure, the resiliency of the technology infrastructure and additional cybersecurity tools have been included in the initial years of the plan.

The demand for IT services exceeds available resources. Several major projects are planned, which will further stretch technology staff. Additional investment in improving and managing business applications are necessary to support increased communications, applications, data sharing, and reporting needs. With the many needs, technology governance will be important to the successful implementation of the plan. Successful implementation will also require additional resources dedicated to cybersecurity and business application analyst(s) assisting departments to improve application utilization and efficiency.

Due to limitations, staff training, and underutilization of some software systems, department staff have created numerous manual workarounds that increase reliance on external shadow systems to bridge application business process shortcomings. The goal of the plan is to affect a Digital Transformation at the City, reducing the reliance on paper and shadow systems while increasing automation and efficiency.

12.D-9Council Agenda 11-15-2022
Attachment 1
Packet Page 232

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
6 | 29
Current Technology Environment
The majority of IT infrastructure is aging and will require a refresh within the next two years.

The City Hall structured cabling system was not installed according to best practices and should be replaced to reduce maintenance costs and increase bandwidth. Additional investment in cybersecurity mitigation efforts, disaster recover planning, and system resiliency are outlined in the below plan. We recommend that the City expand capital replacement planning to include all technical equipment and a long-term sustainability plan to institutionalize ongoing investment in technology.

The table below summarizes the current technology environment at the City:

Item Quantities
Number of Agency Facility Addresses 17
IT FTE (including contracted IT Staff) 2
Number of Employees (FT/PT) 64/52
Telephones 110
Smart phones 65
Tablets 35
Desktops/Workstations 75
Laptops 31
Printers 24
Physical Servers 20
Virtual Servers 30
Network Devices
(e.g., routers, switches, access pointes, etc.) 41

Additionally, the City currently utilizes over 100 application systems and software modules.

Major enterprise application systems include:

Application Functionality Vendor
Financial Management Springbrook
Budgeting - Operating Manual/Spreadsheets / Springbrook Budgeting – CIP Manual/Spreadsheets
Human Resources Springbrook / NeoGov
EAM (Enterprise Asset Mgmt./Work Orders &
Maintenance Management) iWorQ
Land Management/Community Development (Licensed
but not implanted or used) Citizenserve
Police – CAD Dispatch and Records Management SunRidge
Electronic Document and Records Management Laserfiche
Geographic Information System (GIS) ESRI ArcGIS

12.D-10Council Agenda 11-15-2022
Attachment 1
Packet Page 233

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
7 |29
Key Statistics and Metrics
The following analysis provides feedback on key measurements regarding technology investments and IT support operations:

Technology Budgeting/Expenditures Technology Spending vs. Operating Related Budgets IT Staffing IT Staffing Ratios
IT Capital Replacement Schedules Equipment Replacement Schedules Technology Spending versus Operating Related Budgets
Technology Spending versus Operating Budgets provides an overall indication of whether the technology systems and IT support function receive a sufficient level of organizational resources to provide the necessary services. Over time, underfunding typically reduces the IT Department’s ability to respond to requests, reduces system availability, and negatively impacts organization-wide productivity.

The following table depicts Pismo Beach’s Technology Spending versus Recommended Best Practices and a local government benchmark of 30 agencies.

Pismo Beach
FY21 (Actual)
Pismo Beach
FY22 (Budgeted)
Pismo Beach
FY23 (Budgeted)
Recommended
Low Benchmark Recommended
High

2.31% 2.24%2.31%3.00%3.82%6.0%

12.D-11Council Agenda 11-15-2022
Attachment 1
Packet Page 234

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
8 |29
The City’s total operating expenditures for FY20 (actual), FY21 (budgeted), and FY22 (budgeted) totaled $32,575,172, $35,019,300,and $46,062,371, respectively. Technology expenditures approximated $751,173, $785,646, and $1,065,750, respectively. The municipal spending benchmark in the survey ranges between 2% and 8%. Survey results have an average technology expenditure of 3.82%. The historical percentage of technology expenditures versus operating-related budgets at Pismo Beach have been below municipal industry standards. This can be indicative of an agency that is under-investing in technology and has lower IT staffing levels than peer agencies.

Based on a heightened level of cyber threats and increasing cybersecurity insurance requirements, we are recommending a significant increase in the City’s ongoing investment in cybersecurity. The report also recommends improvements to the Land Management system (Permits, Inspections) which will provide benefits to developers, contractors, and residents.

Further recommendations include improvements to the majority of major application systems at the City. We expect these infrastructure improvements and application system enhancements to result in increased productivity throughout the City. Increase support of public safety technology initiatives and improved resident services through technology are also expected.

IT Staffing Ratios
The following table depicts Pismo Beach’s IT Staffing Ratios per employee and computer equipment versus a municipality benchmark of 50 similar agencies. These are commonly used measures in the industry to validate staffing levels. As the number of individuals served and the amount of equipment increases, staffing levels should also increase.

Pismo Beach Municipality
Benchmark
Recommended
Best Practice
Employees per IT Staff 75 72 75
Servers per IT Staff 25 10 10
Computers/Laptops per IT Staff 75 67 60
id d d Thi can b
s
f
e
i
u
a
o

CC FF SF T C
75 59 60
0 30
60 90 Computers/Devices Per IT
Staff Pismo Beach
Municipality
Benchmark
Recommended
Best Practice
e
a
b c
v
o e
r e
u h
h a
d resident services through technology are also e
25 9 10
0 10
20 30
40 Servers Per IT Staff
Pismo Beach
Municipality
Benchmark
Recommended
Best Practice
y a
6 i $
n %
e technology expenditure of 3 82%Thehistoric
75 64
75 0
30 60
90 Employees Per IT Staff
Pismo Beach
Municipality
Benchmark
Recommended
Best Practice

12.D-12Council Agenda 11-15-2022
Attachment 1
Packet Page 235

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
9 |29
In the above comparison, the City’s IT staff supports more computers, and servers than recommended when compared to peer agencies. We were impressed by the productivity of the IT staff and their ability to work on many projects simultaneously. The City has had a long-term relationship with a third-party provider to assist with help desk requests and projects. Recent staffing changes at the provider have made their services less effective. We recommend the City investigate additional third-party resources to assist staff in the short term.

The volume of operational tasks required of IT continue to increase as additional cybersecurity requirements are added to the workload. The City should consider adding an additional IT team member within the next two or three years.

Equipment Replacement
Capital Equipment Replacement is an important measure of the ability of hardware to adequately support the ongoing vendor changes to application software. These changes often require additional resources and hardware that are more robust. Slow capital replacement cycles can result in overall increased downtime and slower system response times.

The following table represents IT equipment replacement recommended best practices and a municipal benchmark of 53 agencies.

Pismo Beach Municipality
Benchmark
Recommended
Best Practice
Laptops 4 4 4
PCs 4 4 5
Servers 5 5 5
444
0 2
4 6
Ye
a
r
s
Laptops
Pismo Beach
Municipality
Benchmark
Recommended
Best Practice
44 5
0 2
4 6
8 Ye
a
r
s
PCs
Pismo Beach
Municipality
Benchmark
Recommended
Best Practice
555
0 2
4 6
8 Ye
a
r
s
Servers
Pismo Beach
Municipality
Benchmark
Recommended
Best Practice

12.D-13Council Agenda 11-15-2022
Attachment 1
Packet Page 236

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
10 | 29
The City does a good job of replacing aging equipment in a timely manner. Staffing issues are slowing some server operating system upgrades and cybersecurity improvements. We recommend the City expand computer equipment replacement to include all IT infrastructure.

We have included an initiative with an expanded list of IT infrastructure components and their expected lifecycles in this report.

12.D-14Council Agenda 11-15-2022
Attachment 1
Packet Page 237

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
11 | 29
Technology Strategies, Goals, and
Objectives
Strategies for leveraging and maximizing information system utilization in delivering City services are listed below. Within each strategy, initial goals and objectives are identified. The goals and objectives have been translated into specific initiatives later in the Technology Current State Assessment section of the report. Outlined in the report are the budgetary costs for each initiative, prioritization, and implementation time frame.

Ensure Technology Governance
Goals and Objectives
x Utilize the Technology Steering Committee and governance mechanism. Š Focus Committee meetings on prioritizing technology projects and training needs. Š Monitor the Plan and recommend adjustments on an annual basis. Š Utilize the Committee to improve collaboration on projects and initiatives. ƒ Focus on applications integration across departments. ƒ Identify key business process issues and improve.
Š Establish training goals and develop analytical skills throughout the organization.

Improve Application Utilization
Goals and Objectives
x Develop improvement plans for departmental and enterprise applications. Š Identify and implement improvements that benefit City constituencies. Š Continue to work with departments to increase efficiency by leveraging application software functionality to streamline and automate processes. x Plan for and fund adequate user training and support for business application systems. x Maintain a culture of departmental enterprise application ownership for core applications. Š Continue to adapt and improve processes and data availability while integrating business application software.
x Increase the availability of IT resources capable of assisting departments and improve business processes and application utilization.
x Follow Application Management Best Practices.

12.D-15Council Agenda 11-15-2022
Attachment 1
Packet Page 238

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
12 | 29
Establish a City-wide Technology Training Program
Goals and Objectives
x All departments requested some technology training, include Microsoft Office classes and department software applications.
x Utilize the Technology Steering Committee to develop citywide training priorities and create an annual budget item to fund training.
x Incorporate sufficient training in business application improvement or replacement projects. x Train staff on Microsoft 365 OneDrive and SharePoint to improve utilization and collaboration.

Develop a GIS Master Plan
Goals and Objectives
x Geospatial Information Systems (GIS) are a key strategic component of Enterprise Asset Management, Land Management and Smart City applications. x GIS data is fragmented with applications utilizing data sets unique to the application. x Centralizing GIS data management can result in an enterprise GIS system capable of functioning as the master address and parcel database.
x Conduct a citywide GIS Master Planning project to identify department resources working on GIS and existing GIS data sets. The Master Plan should outline long term resource requirements to improve GIS capabilities and services to staff and the public.

Strengthen Infrastructure Resilience and Disaster Recovery Capabilities Goals and Objectives
x Continue to implement redundant high-speed Internet connections. x Expand current information technology security efforts to include additional monitoring and advanced threat-protection tools.
x Implement Microsoft 365 and an electronic mail archiving/backup solution. x Develop a Cybersecurity Emergency Response Plan.
x Develop and test a Disaster Recovery Plan.
Š Identify high-priority systems and recovery time frames. Š Exercise and test Disaster Recovery Plans regularly.

12.D-16Council Agenda 11-15-2022
Attachment 1
Packet Page 239

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
13 | 29
Adopt Digital Transformation as a Strategy
Goals and Objectives
x Enhance or procure business application systems to automate and streamline departmental operations.
x Inventory manual application system interfaces and automate. x Improve business application access and training for all users. x Leverage business systems to improve cumbersome business processes. x Inventory unmet reporting needs by department and application system. Š Include currently maintained/created manual and shadow system (e.g., Excel) data tracking and reporting.
Š Develop plans to automate reporting.
Š Create dashboards to assist in ongoing management and decision-making. x Obtain vendor report writer training for applicable systems and City staff.

Expand Business Analysis Capabilities
Goals and Objectives
x Consider increasing IT staff to include a Business Systems Analyst position to assist departments with business process improvements.
Š Assist with application assessments and implementations. Š Work with departments to improve business processes.
Š Develop dashboards, reports, and information sources for staff and constituents. x Depending on the amount of available funding, utilize third parties to assist departments with business process related improvements.

Land Management Improvements
Goals and Objectives
x Staff are not satisfied with the capabilities of the current Land Management system. x Efforts are underway to work with the vendor to improve system utilization, including online permitting and reporting capabilities.
x Consider documenting all City requirements to determine if the current vendor can meet those requirements.
x If the vendor has the capability, utilizing implementation project management best practices to continue working with the vendor.
x If the vendor does not have the capability, utilize software selection best practices to select a replacement vendor.

12.D-17Council Agenda 11-15-2022
Attachment 1
Packet Page 240

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
14 | 29
Downtown Wireless
Goals and Objectives
x The City is interested in Smart Parking improvements in the downtown area. x The Police Department has requested additional connectivity to city systems from the portable command center.
x Expansion of public safety video and other wireless based applications can be expected in the downtown area.
x Providing residents and visitors with limited wireless capabilities would be beneficial. x The City owns the majority of light posts in the downtown area. Light posts are excellent locations for wireless and Internet of Things devices.
x Design and implement a downtown wireless mesh system to support Public Safety, Smart City applications and provide limited wireless capabilities for residents and visitors.

Business License System Improvements
Goals and Objectives
x Staff report that the Transient Occupancy Tax (TOT) tracking is cumbersome within the existing business license system.
x TOT is a significant source of revenue for the City and efforts to improve TOT processes would improve efficiency and reporting capabilities.
x Consider documenting all City requirements to determine if the current vendor can meet those requirements.

Improve Cybersecurity
Goals and Objectives
x Over the last few years, cybersecurity incidents in local government have increased dramatically.
x Cybersecurity insurance carriers are rapidly increasing base requirements for maintaining cybersecurity insurance.
x Additional cybersecurity requirements have been codified for critical infrastructure including water and wastewater.
x Improving the City’s cybersecurity posture to meet these increasing requirements will require significant resources over the duration of this plan.

12.D-18Council Agenda 11-15-2022
Attachment 1
Packet Page 241

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
15 | 29
Technology Decision-Making
Principles
Vision / Mission Statement
The City of Pismo Beach is dedicated to providing the highest quality technology-based services in the most cost-effective manner to deliver services effectively and efficiently on a sustained basis that reflects the organization's dedication to excellent customer service. The City will ensure its information systems are maintained in a secure environment, are capable of supporting information technology advancements made by the City and will exist in an integrated environment that fosters an open, collaborative, and unifying culture. x Technology is committed to the values of:
Š Reliability
Š Professionalism and Integrity
Š Efficiency and Effectiveness
Š Innovation
Š Excellence
Š Collaboration and Teamwork
x Given Limited IT Resources, the City will focus these resources on the most productive and cost-effective projects.
x City departments will agree on a Collaborative Long-Term IT Vision and Strategies, which requires active participation in setting IT priorities through an IT Committee consisting of department leadership.
x The City will strive to Maximize Utilization of Existing Systems and prior investments in application software, as well as to expand functionality and seek enhancements to existing applications.
x The City is committed to ensuring Sufficient Staff Training and Application Software Knowledge of existing vendor systems.
x Department Ownership is fundamental to achieving maximum return-on-investment of applications. Departments recognize the importance of assuming responsibility for managing and implementing their specific core business applications, with the support of IT staff. City departments are committed to taking responsibility for adapting and improving processes to best integrate them with the application software.

12.D-19Council Agenda 11-15-2022
Attachment 1
Packet Page 242

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
16 |29
IT Initiative Summaries
Introduction
Technology Planning is a process to assess, research, prioritize, budget, and plan future technology initiatives. Some of the following initiatives are ready for approval and implementation, while others require further assessment and research before the City can make a final determination of priority, resource requirements, and cost-benefit.

Productivity Improvement –Many of the following initiatives will have a direct impact on overall productivity within the organization. Some of these initiatives will significantly impact business processes, reducing staff time required to complete certain tasks, while others will ease or speed up delivery of services to City residents.

Reporting and Data Availability –Many of the initiatives outlined will have direct impact on the data that is available for reporting and management decision-making. New application systems and in some cases improvement of existing software systems are necessary before certain can be made available.

Infrastructure Improvements –The technical initiatives are focused on improving the City’s technological infrastructure to provide secure, reliable, and supportable network services to staff and residents. Infrastructure improvements may involve equipment upgrades, cybersecurity enhancements, or operational improvements that are focused efficient and effective delivery of business applications to City users.

IT Initiative Categories
The assessment process resulted in over 70 major initiatives and projects, as well as hundreds of recommendations. Combined, there are hundreds of findings and recommendations throughout the report. ClientFirst classified the major initiatives into eight categories, including:

Best Practices Smart
Technologies IT Operations Cybersecurity
Departmental
Applications
and Systems
IT Infrastructure Tele-
communications IT Staffing

12.D-20Council Agenda 11-15-2022
Attachment 1
Packet Page 243

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
17 |29
The following are the total initiatives by priority and initiative category.

Priority
Categories High Medium Low Total
Best Practices 2 13 0 15
Department Applications and
Systems 69419
Smart Cities 3 3 2 8
IT Infrastructure 14 9 0 23
IT Operations 5 1 0 6
Cybersecurity 13 3 0 16
IT Staffing 0 1 0 1
Telecommunications 1 0 0 1
Total 44 39 6 89
0 5
10 15
20 25
30 35
40 45
High Medium Low
44 39
6 Initiative Totals by Priorities

12.D-21Council Agenda 11-15-2022
Attachment 1
Packet Page 244

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
18 |29
0 2
4 6
8 10
12 14
Priorities by Initiative Category
High Medium Low

12.D-22Council Agenda 11-15-2022
Attachment 1
Packet Page 245

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
19 | 29
Key Issues and Initiatives
The following are the key issues and initiatives identified during the planning process. These initiatives could also be considered high priority. The key initiatives listed below either provide long-term building blocks for the success of the plan or mitigate risk. The City has made note of these as the initiatives from this plan that should be kept in the forefront during future implementation of this plan.

Technology
Governance
x Technology Governance provides a vehicle for
departments to work together to manage the Technology
Master Plan and coordinate its recommendations.
x Utilizing a Technology Steering Committee mechanism,
departments, City management, and IT can work
together to prioritize and execute the technology plan. x The City should revitalize the Technology Steering
Committee, focusing on departmental application and
business process improvements.
x Based on department feedback identifying and satisfying user training needs should also be a focal point for the Technology Steering Committee.

User Training
x All City departments expressed a desire for extensive application software training to improve departmental
operations.
x Application software training is a key component in
increasing application utilization and operational
effectiveness and efficiency.
x The Technology Steering Committee should gather
department training needs and prioritize.
x During the initial year of the plan, focus on training for Microsoft SharePoint file sharing and collaboration to
increase staff productivity.

12.D-23Council Agenda 11-15-2022
Attachment 1
Packet Page 246

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
20 | 29
Centralized Land
and Parcel
Management
x Citizenserve, is the primary system for permitting,
inspections, and other Land Management features.
x Staff feel that the system needs improvements to serve residents and contractors in an efficient manner.
x The plan recommends creating a gap analysis and
documenting requirements to determine if Citizenserve is the proper long-term solution for the City or if another system should be implemented.
x Leveraging additional GIS integration with Land
Management would also provide efficiencies and
improved information availability.

Enterprise Asset
Management
Replacement (EAM)
x There are significant gaps in EAM system functionality as implemented.
x Staff reported that additional implementation work is required to fully utilize the system.
x The plan recommends identifying EAM system gaps and
development of an improvement plan to close gaps
between current and desired processes.
x Asset management systems are one of the five most
complicated systems at a municipality. The City will
reduce risk by contracting with a subject matter expert to assist in the assessment and business process reviews.

Business License
and Transient
Occupancy Tax
(TOT)
x The City implemented a new business license system in 2017.
x TOT is a significant revenue source for the City.
x Staff report difficulties processing license renewals and TOTs.
x We recommend using recent experience to gather all
TOT requirements. Then determine if the current system can meet those requirements.
x If the current system is insufficient, then perform a Best Practices software selection for Business Software and
TOT processing.

12.D-24Council Agenda 11-15-2022
Attachment 1
Packet Page 247

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
21 | 29
GIS Improvements
x GIS and spatial maps are a key component in the
management of the City’s assets and development.
x GIS also provides critical information and data elements that benefit many of the City’s operations including future Smart City initiatives.
x GIS systems can be integrated with land management,
asset management, and document management
applications to improve field-based information storage and retrieval.
Š Expanded integration with the City’s enterprise
applications will improve application effectiveness.
x The City recently expanded its contract with a third-party GIS consultancy to provide additional services.
x Departments have a backlog of requests for GIS
improvements and integration.
x The plan recommends a GIS-specific Assessment and
Strategic Plan to identify all GIS needs and develop a
multi-year plan to address those needs and provide
ongoing support.

Microsoft Office
(SharePoint/Teams)
x The City has moved to Microsoft Office 365 and begun
to use several Teams applications.
x Additional training is necessary to gain the full benefit of OneDrive and SharePoint file sharing and collaboration
tools.

Disaster Recovery
Planning
x The City does not have a Cybersecurity Incident
Response or Disaster Recovery Plan.
x Incident Response Planning can reduce the time
required to respond to a cybersecurity issue, potentially reducing its impact.
x We recommend the City develop an Incident Response
Plan as soon as practical.
x Disaster Recovery Planning has changed recently due to the prevalence of cloud-based backup and restoration
services.
x Once cloud-based backup and recovery have been fully
tested, a Disaster Recovery Plan should be created to fit upgraded technology.

12.D-25Council Agenda 11-15-2022
Attachment 1
Packet Page 248

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
22 | 29
Backup Systems
x City backup systems are sufficient to insure eventual recovery of city business applications and data.
x Recent advances in cloud-based backup systems have
led to turnkey systems that backup application data and provide for rapid restoration of business applications. x These systems also have features that reduce the
likelihood of successful attack by malware.
x We have included funding for improved backup systems
with disaster recovery capabilities in the plan.

Business Analysis
and Project
Management
Skillset Needs
x The plan outlines business process improvement needs
for the majority of City systems. These improvements
will save staff time and, in many cases, improve resident services.
x The plan also recommends much needed cybersecurity
improvements which will be a major focus of current
staff.
x Successfully implementing the plan will require additional business analyst and project management skills beyond
those that are currently available.
x There are many manual processes in place that could be automated without significant investment in equipment of software.
x We believe automation will result in a significant return on investment and improved services.

12.D-26Council Agenda 11-15-2022
Attachment 1
Packet Page 249

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
23 |29
Summary Plan Budget Analysis
The Technology Assessment budget is not an entirely new set of spending requirements. The plan encapsulates all information technology issues and the needs of all departments in the City. Some initiatives are normally funded by departments themselves, and some may already have capital reserves set aside, while others are part of the normal annual IT budgeting process. These are estimated budgets for each project initiative. All project approvals will follow normal City annual budget request and procurement policies and procedures required by the City.

Budgets by Initiative Category
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
FYE
2023
FYE
2024
FYE
2025
FYE
2026
FYE
2027
FYE
2028
Recommended 6 Year Plan
Telecommunications
IT Staffing
Cybersecurity
IT Operations
IT Infrastructure
Smart Cities
Department Applications
and Systems
Best Practices
Categories FYE 2023 FYE 2024 FYE 2025 FYE 2026 FYE 2027 FYE 2028 Totals Best Practices $ - $ 20,000 $ 23,200 $ 10,000 $ 10,000 $ 10,000 $ 73,200 Department Applications
and Systems $ 338,000 $ 300,000 $ 267,500 $ 290,250 $ 123,275 $ 266,603 $ 1,585,628 Smart Cities $ - $ 5,200,000 $ 80,000 $ 80,000 $ 80,000 $ 145,000 $ 5,585,000 IT Infrastructure $ 145,600 $ 340,400 $ 490,400 $ 327,400 $ 222,900 $ 267,400 $ 1,794,100 IT Operations $ 11,400 $ 8,000 $ 42,000 $ 34,250 $ 35,563 $ 8,000 $ 139,213 Cybersecurity $ 27,150 $ 248,350 $ 175,550 $ 130,550 $ 130,550 $ 10,800 $ 722,950 IT Staffing $ - $ - $ - $ 119,000 $ 123,760 $ 128,710 $ 371,470 Telecommunications $ 32,000 $ 14,400 $ 14,400 $ 14,400 $ 14,400 $ 14,400 $ 104,000 Totals $ 554,150 $ 6,131,150 $ 1,093,050 $ 1,005,850 $ 740,448 $ 850,913 $ 10,375,560

12.D-27Council Agenda 11-15-2022
Attachment 1
Packet Page 250

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
24 |29
Total Plan Budget by Priority and Fiscal Year
Below are total funding amounts included in the plan by priority. This includes items already funded and items funded through special funds or grants.

Categories FYE 2023 FYE 2024 FYE 2025 FYE 2026 FYE 2027 FYE 2028 Totals High Priority $ 554,150 $ 6,062,750 $ 442,550 $ 408,800 $ 412,613 $ 312,800 $ 8,193,663 Medium Priority $ - $ 68,400 $ 615,500 $ 577,050 $ 272,835 $ 303,113 $ 1,836,898 Low Priority $ - $ - $ 35,000 $ 20,000 $ 55,000 $ 235,000 $ 345,000 Totals $ 554,150 $ 6,131,150 $ 1,093,050 $ 1,005,850 $ 740,448 $ 850,913 $ 10,375,560 $-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
FYE 2023 FYE 2024 FYE 2025 FYE 2026 FYE 2027 FYE 2028
Budgets by Priority and Fiscal Year
High Priority Medium Priority Low Priority

12.D-28Council Agenda 11-15-2022
Attachment 1
Packet Page 251

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
25 |29
Unfunded Projects included in the Plan by Priority and Fiscal Year The below summarizes projects recommended by the plan that are currently unfunded. These projects would be funded through increased General Fund spending or increased allocations to the Technology Service Fund.

Categories FYE 2023 FYE 2024 FYE 2025 FYE 2026 FYE 2027 FYE 2028 Totals High Priority $ 111,950 $ 844,150 $ 399,350 $ 365,600 $ 369,413 $ 169,600 $ 2,260,063 Medium Priority $ - $ 68,400 $ 565,500 $ 577,050 $ 272,835 $ 303,113 $ 1,786,898 Low Priority $ - $ - $ 35,000 $ 20,000 $ 55,000 $ 235,000 $ 345,000 Totals $ 111,950 $ 912,550 $ 999,850 $ 962,650 $ 697,248 $ 707,713 $ 4,391,960 $-
$200,000
$400,000
$600,000
$800,000
$1,000,000
FYE 2023 FYE 2024 FYE 2025 FYE 2026 FYE 2027 FYE 2028
Budgets by Priority and Fiscal Year
High Priority Medium Priority Low Priority

12.D-29Council Agenda 11-15-2022
Attachment 1
Packet Page 252

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
26 |29
Conclusion
Moving Forward
Moving forward over the next 18 to 24 months, the key areas of focus for information technology include Land Management, GIS, and
cybersecurity improvements. We are also
recommending increased applications
training, initially focused on Office 365 file
sharing and collaboration. Additional
projects for Public Safety video and a new
Public Safety building will also require
significant IT staff time.

Also recommended are implementation of
a Technology Governance methodology, creation of a central parcel data base and improvements to business license and TOT processing.

Developing a Cybersecurity Incident Response Plan and updating the Disaster Recovery Plan will also be critical components of a successful Technology Plan implementation.

This report contains ambitious and costly technology objectives for the City. If the City chooses to implement these systems rapidly, organizational change management and strategic oversight will be critical to the City’s success. In many cases, we continue to work with agencies on these issues during assessment, planning, and implementation. We have found slow and steady progress following best practice methodologies leads to improved likelihood of success, higher quality implementations, and improved staff utilization and data management of new systems.

Cybersecurity –Cybersecurity resource demands continue to increase. Developing policies and procedures, expanding the City’s cybersecurity toolset, and improving resiliency and recoverability are important components of a cybersecurity program that will reduce risk of compromise and improve recoverability.

Application Utilization –City departments want to improve their core business processes and fully utilize their applications. The City should work to encourage a sense of application ownership and continuous improvement by the departments. Improved application utilization is the most effective way to increase data availability, staff productivity, and improve customer service.

IT Staffing –City IT staff have many responsibilities. Expanding business analysis and project management capabilities over time will provide IT staff with additional skills necessary to assist departments in making business process and application improvements.

It is expected that the projects outlined in this report to result in improved productivity and customer service, as well as improved resiliency and sustainability.

Third-party subject-matter experts will be helpful for projects that are high priority, beyond the scope of City skill sets, and/or lacking internal resource availability.

The City should review and update the Plan annually, using an abbreviated version of this assessment and planning methodology. In this way, the plan will be a vehicle to continuously guide the information technology activities of the City. Annual plan updates should be synchronized with the City’s annual budget process, so technology initiative costs can be properly represented.

12.D-30Council Agenda 11-15-2022
Attachment 1
Packet Page 253

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
27 | 29
Benefits
The completed Plan should not be viewed as static, but rather as a dynamic tool to be revised and updated as business conditions and requirements change. If the planning function is not an ongoing process, certain objectives and benefits will not be realized, because the objectives themselves may change as the organization and its environment evolves.

Major benefits that should be realized through the implementation of this Technology Assessment and Plan include:
x Increased collaboration and communication on technology projects within the organization x Transformation of the organization’s overall understanding, knowledge, and stewardship of information technology
x Clear direction for IT operations and technology projects for the next several years, focused on meeting the organization’s needs
x Citywide department consensus and understanding of all technology initiatives and their priorities
x A roadmap for the selection, implementation, and improvement of business applications to better serve residents and staff
Immediate Next Steps
It is recommended that the City create a Technology Steering Committee to begin work by reviewing the Plan and budget and advising on priorities. Next, assign lead and participatory resources to the top priority technology initiatives, as well as all other high-priority initiatives.

Initiative leaders should report status updates for active initiatives to the Technology Steering Committee as part of each meeting agenda.

Major issues for each initiative should be discussed by the Committee providing general feedback, collaboration, and lessons learned, as many of the initiatives cross departmental boundaries.

In order to improve application utilization, management, and support, it is also recommended a series of training seminars be developed for key department stakeholders and enterprise business application users. This is an effective way to maintain momentum and kick off the tremendous change that is to occur in improving operations and constituent services.

12.D-31Council Agenda 11-15-2022
Attachment 1
Packet Page 254

Technology Master Plan

CLIENTFIRST TECHNOLOGY CONSULTING

OPTIMAL TECHNOLOGY GUIDANCE
28 | 29
Technology Master Plan Capital
Budget
The following section provides the five-year master planning budget detail by project initiative.

Please note these subtotals are not the annual IT Department operating budget. These are estimated budgets for each project initiative. All project approvals will follow normal City annual budget request and procurement policies and procedures required by the City.

12.D-32Council Agenda 11-15-2022
Attachment 1
Packet Page 255

Technology Master Plan
Budget
Low High
Best Practices
1 Technology Governance
Best Practice for managing and prioritizing the limited resources of the IT function and technology project initiatives. Conduct a Technology Governance Training Workshop that will include a governance guideline binder for City's future use and reference.

H All $0 $10,000 $5,000 Tech Svc Fund
2 IT Project and Services Portfolio Document IT roles and responsibilities for all services, including SLA, for business application support.M IT $0 $12,500 $8,200 Tech Svc Fund 3 Project Planning and Implementation Best Practices Best Practice focused on utilizing project planning techniques to deliver projects in a timely manner with less risk.M All n/a n/a Tech Svc Fund 4 Maintaining Software Updates Maintaining consistent software versions across users.M All n/a n/a Tech Svc Fund 5 Cloud Computing
Utilize return-on-investment methodologies to make decisions regarding options for Cloud/hosted solutions vs. traditional on- premise licensing models.

M IT n/a n/a Tech Svc Fund
6 Mobile Computing Consideration for additional and new mobile technology utilization throughout the City.M All n/a n/a Tech Svc Fund
7 Applications Management Best Practices Identify application owners and champions within the Departments to lead improvement efforts.M All n/a n/a Tech Svc Fund
8 Software Selection Best Practices
Best Practice focused on reducing risk and improving software selection outcomes while maximizing value through a competitive selection process.

M All n/a n/a Tech Svc Fund
9 User Training and Support Initially train on SharePoint/OneDrive uses. Then ongoing Office and Departmental training budget year-over-year. Recurring budget item.H All $15,000 $10,000 $10,000 $10,000 $10,000 Tech Svc Fund 10 Training Room
The City currently uses Council Chambers or Executive Conference Room for large meetings and software training. The recommended applications improvements and implementation of a new ERP system will require space for computers, screens, and printers for configuration and training for the duration of the plan.

M All TBD TBD Tech Svc Fund
11 Centralized Land and Parcel Data Management Maintaining consistent data and integrations through the GIS system.M CD, PW n/a n/a Tech Svc Fund 12 Sustainability Planning Develop a long-range plan to continue to support applications and underlying technology with updates as needed.M All $0 $7,500 $5,000 Tech Svc Fund 13 Return-On-Investment Considerations
Policy and practices the City will follow per the initiative recommendations. Topic will be covered in the Technology Governance Workshop noted in that initiative.

M All n/a n/a Tech Svc Fund
14 COBIT (Control Objectives for Information and Related Technologies)
Utilize COBIT Best Practices to improve IT services planning and life cycle management.M All n/a n/a Tech Svc Fund
15 ITIL (Information Technology Infrastructure Library)ITIL is a standard for delivering IT services.M IT n/a n/a Tech Svc Fund Departmental Applications and Systems
16 ERP Gap Analysis and Utilization Improvements
Conduct a needs assessment to close functional gaps and improve work flows, reporting, data availability, and integrations with other applications.

L All $50,000 $125,000 $35,000 $75,000 Tech Svc Fund
17 Budgeting Process Improvements Focuses on a process review and plan to improve the budget creation process.M All $10,000 $35,000 $15,000 Tech Svc Fund
18 Time and Attendance System Online employee time tracking system with integration to payroll.H All $25,000 $75,000 $50,000 Tech Svc Fund Ongoing
FundFYE 2028
In
i
t
i
a
t
i
v
e
IT Initiative Comments
Pr
i
o
r
i
t
y
Departments
Affected
Budget Range
FYE 2023 FYE 2024 FYE 2025 FYE 2026 FYE 2027

Page 1 of 512 ends
← All documents from this meeting