4L(I
F&H CONSTRUCTION
LDA Partners
❑ESIGNERS & ARCHITECTS
Pismo Beach Public Safety Facility
29 March 2023
F&H Construction & LDA Partners
Our Team
•Collaboration, not
Conflict
•Integrated Team
•True Design Build
Team –Contractors
work collaboratively
with all the trades
•Commitment to
Pismo Beach
•65 sheets of design
drawings prepared to
dateKristien Wong
Project Manager
Chris Parker
FD Superintendent
Brian Haggstrom
PD Superintendent
100% Dedicated On-Site Pismo Beach Public Safety Facility Stephen Seibly
Project Director –F&H
Carolyn Natividad
Project Architect –LDA
Eric Wohle
Architect of Record -LDA
Core Design & Build Team
Who We Are
Who We Are
Relevant Design Build Experience
community partnership
Strategies
Community Partnership
Existing School
F&H’s goal to ensure that we
have measures in place to
eliminate chances of neighbor
disruption.
At the beginning of the project,
we will:
•Local outreach to abutting
residences, schools and the
neighborhood. Providing contact
information for F&H as first point
of contact.
•Gather neighborhood contact
information to keep all well
informed of activities regularly.
•On-site meet & greet with local
neighbors to establish
relationships with residents.
•Drone documentation at the
beginning of the project and bi-
monthly to document existing
conditions.
•Post work hours and notify of any
major activities.
•Provide access for traffic and
determine best delivery routes.
Existing
Pre-School
School Safeguards
Existing School
Safeguarding Schools
Entrance is further north on
Wadsworth Ave. from
construction impacts, but
special attention to be given
with noise, traffic and dust from
construction activities.
Special attention to be given to
noise, traffic and dust from
construction activities.
Existing Pre-School
Meet with each school prior to the
start of construction to outline
construction procedures, schedules
and mitigation measures.
Noise
•Will follow noise ordinance
for area.
•Will notify the community
in advance when there will
be heavy equipment/loud
noise.
Construction traffic
•Will provide traffic control
flaggers, as necessary.
•Will coordinate deliveries to
not impede on school drop
off and pick up times.
Community Partnership
Site Management
Existing School
Site Logistics
•Multiple off site storage and lay
down areas are available to F&H
Construction and will be used as
needed throughout construction
to minimize neighborhood
disruption.
•Church Parking Lot; F&H
Laydown/staging area: extents to
be coordinated with City and
Church.
•Concrete Washout: Phased and
relocated as needed during
construction.
•Misc. on-site storage units.
•Perimeter Security fencing.
•Construction Entrance with
stormwater and dirt mitigation to
maintain neighborhood. Phased
as needed during construction.
•Limits of Construction Traffic.Existing Pre-School
Community Partnership
Tentative Outline Schedule
CELEBRATE!!
Keep the community involved & they become a part of the project’s success.
Community Partnership
building organizations &
systems
Site
Design Considerations
•Staff patios
•More efficient staff parking
•Reduces gates
Building Organization & Systems
•Consolidates Public Parking
•Pedestrian access to Church Parking lot
•25’ from Bldg. to Wadsworth P.L. / 35’ from 2nd floor •30’ from Bldg. to Bello P.L / 38’-46’ from 2nd floor
Site Grading
Design Considerations
•Use of retaining walls to establish gradient
•Separated domestic & fire water services
•Keeps grade at 10% max
Building Organization & Systems
10%
Site Utilities
Design Considerations
•New wet utility services to site
•Underground retention SW vaults
•Reconstructed Off –Site frontage
Building Organization & Systems
Site Circulation
Design Considerations
•Allows for softer turning movements
•Allows for future 100’ ladder truck
•Separates vehicular & pedestrian paths
Building Organization & Systems
Landscape
•Design Considerations
•Low maintenance
•Exceeds requirements for Low irrigation
•Exterior spaces for PD & Fire
•Utilizes native plants
•Smart controllers
•Locations for future Memorials
Building Organization & Systems
Building Organization -PD
Police Department Organization -1st Floor
•Secure from general public -All access behind a
secure limit line
•Central corridor for ease of navigation
•Efficient layout
•Centralized vertical circulation
•Personnel flows –direct access to departments
•Direct access to parking lot
•Rooms have VRF HVAC control
Building Organization & Systems
Building Organization -PD
Police Department Organization –2nd Floor
•All access behind a secure limit line from 1st floor
•Central corridor for ease of navigation
•Stacking structural system
•Rooms have VRF HVAC control
•Privacy for staff
•Staff balconies
•Efficient administrative layout
•Exterior break areas for staff and dispatch
Building Organization & Systems
Access Options
Options for PD access:
•Oversized Training Room for flexibility
•Modify program spaces to create secondary direct
ingress /egress
•Does not encumber functionality
Building Organization & Systems
Building Elevations -PD
Building Organization & Systems
Experience in maintaining & restoring historic facades
Building Organization & Systems
Experience in maintaining & restoring historic facades
Building Organization & Systems
Why Demo existing Fire
Station Apparatus Bay and
internal walls instead of
infill?
•Existing structure was single
wythe CMU with limited
reinforcing. Maintaining
would require significant
structural upgrades
•Allows for a longer
Apparatus Bay apron for
vehicles reducing gradient to
street
•Right sizes internal spaces
based upon programmatic
need.
•Eliminates internal ramps
and stairs
•Places day room as direct
adjacency to Apparatus bays
•Reduction in Response
Time!
Building Organization -FD
Building Organization & Systems
Building Organization -FD Fire Station Overview
•Dorm rooms all equal size
•Right sizes internal spaces
based upon programmatic
need.
•Gender neutral restrooms
•Eliminates internal ramps
and stairs
•Allows for a potential future
bay.
•3 means of direct access to
apparatus bay
•Safer for Public Safety Staff
•Reduction in Response
Time!
Building Organization & Systems
Building Elevations -FD
Building Organization & Systems
Structure
Structural Systems
Overview
•Drilled Piers with Grade
Beams
•PD –Steel Framed with
Concrete/ metal deck at
second floor
•FD –Wood framed to match
existing structure
•Seismic joints between new
and existing at FD
•Established Per Criteria
Building Organization & Systems
Site Electrical
Design Considerations
•Common Emergency Generator
•Central electrical hub
•Utilization of Solar panels
Building Organization & Systems
•Redundancy for diversity of ISP
Potential Value Engineering
Value Engineering
Overview
•Review with City ideas that
have cost savings potential
•Review ideas that may
improve on bldg.
functionality and operational
efficiency
•Establishes conformed
design criteria
•Still “future –proofed”
Building Organization & Systems
Potential Value Engineering
Value Engineering
Overview
•Review criteria foundation
systems
•Review elevation options
•Review generator needs &
size
•Review Low V infrastructure
needs
•Validate with City
Building Organization & Systems
Potential Savings: 2.266%
Potential VE Options Potential
Savings
Remove EV chargers from generator 0.235%
Reduce criteria from City sound ordinance for emergency generator 0.559% Relocate FD ATS in PD electric room 0.144%
Reduce generator runtime to 24 hours for non-COPS functions 0.040% Change from (3) 1.5" sleeves to (1) 3" sleeve for low voltage wiring 0.025% Relocate the Fire Station electric room closer to the PD electric room 0.035% Relocate the generator closer to Elect. Room 0.035%
Reduce oversized neutral conductors at both feeder and branch wiring 0.042% Change (9) of the (15) data racks from 4-post seismic racks to 2-post seismic racks 0.084% Only install (1) data cable at each work area outlet where currently 2 cables are shown 0.051%
Reduce the fire station alerting speaker spacing requirements 0.013% Utilize MC cable in lieu of EMT in non DCOA areas 0.169% Reduce access control doors 0.020%
Revise Fire Station Façade to reduce amount of Brick 0.056% Revise PD 2nd floor deck from 3 1/4 lt. wt. conc over 3" x18 gage deck to 2 1/2" lt. wt. conc over 3" x 20 gage. Fire rating of this deck is 1-hour. 0.012% Revise FD foundation system from drilled piers, grade beams and 12" slab. Utilize Over-excavated site, remove expansive soil and place 3 feet of imported engineered fill and 6" of base rock. Install 18" thick concrete mat foundation with #6 @ 12" oc each way, top and bottom.0.294%
Revise PD foundation system from drilled piers, grade beams and 18" slab. Over- excavate site, remove expansive soil and place 3 feet of imported engineered fill and 6" of base rock. Install 24" thick concrete mat foundation with #6 @ 12" oc each way, top and bottom. 0.452%
design
&
construction
management
Communication is Key
•Understand the City’s expectations, design criteria,
Code requirements & City Standards
•Establish open & continuous dialogue with all trades,
the City & the Community throughout design &
construction, and AHJ
•Respond to City & Community needs and concerns
•Establish weekly design meetings that continue
through construction / regular job site meetings
•Review lessons learned from past projects
•Promptly resolve issues.
•Always solution driven.
•Don’t put off tomorrow what can be done today. Be
proactive, voice opinion/concern early & often.
•Don’t skip steps -Do it right and reinforce the Public Trust
Guiding Principals
Design and Construction Management
Construction Tools
•Procore
•Live streaming webcam
•BIM
Administration
•Manage any RFIs
•Approvals of submittals
•Track design changes to the field
Above & Beyond
•Proactive approach
•Regular meetings & Job Walks
•with City
•Promptly resolve field related
Issues
•Respond to community concerns
Working Together
•Avoid red tape issues
•Safeguard the City and its
Stakeholders
•Project is not complete until
closeout is complete
•Don’t point fingers,
help foster solutions!
Design and Construction Management
8 Weeks
16 Weeks Site Design Development / Construction Documents Program Validation & Schematic Design
10 weeks City Final Approval/
Sub-trade Bidding
4 Months Construction
4 weeksCommissioning & Closeout
NTP DBE Selection
COMPLETE
Tentative Outline Schedule
Ci
t
y
A
p
p
r
o
v
a
l
31 Weeks Building Design Development /
Construction Documents
12 weeks City Final Approval/ Sub-
trade Bidding
18 Months Construction
Ci
t
y
A
p
p
r
o
v
a
l
SD
2 Months
DD+ CD
7 Months
Permit
2.5 Months
Construction
18 Months
Move
InRe
v
i
e
w
Re
v
i
e
w
Design and Construction Management
Why Local Subcontractors
•Availability and Proximity to the Project
•Services Capability
•Warranty Services Proximity
•Commitments from Local Carpenters and
Laborers Union
Outreach
•Local Builders’ Exchanges –SLO County BE
•Personal Outreach –Phone calls and email
•Procore and SmartBid, Bluebook/ Dodge, etc.
Local Business Participation
•Thoma Electric –Electrical Design Build
•Boneso Plumbing & Mechanical
•S&M Fire Protection
•Atascadero Glass
•BKF -Civil
•Engeo –Geotechnical
Certified Small Business
•LDA Partners
Local / Small / Disadvantaged Outreach
Design and Construction Management
our shared vision
Elevations
Our Shared Vision
Birds eye
Our Shared Vision
Northwest
Our Shared Vision
North
Our Shared Vision
Police Memorial
Our Shared Vision
West
Our Shared Vision
Entry
Our Shared Vision
Public Lobby Option
Our Shared Vision
Public Lobby Option
Our Shared Vision
Night
Our Shared Vision
Fire Station -West
Our Shared Vision
Fire Station -West Option
Our Shared Vision
Fire Station -West Option
Our Shared Vision
Memorial Plaza
Our Shared Vision
SouthWest
Our Shared Vision
Day Room
Our Shared Vision
Night
Our Shared Vision
Night
Our Shared Vision
Your Public Safety Facility
Our Shared Vision
Your Public Safety Facility
Our Shared Vision
We have the right goals, project
type, & true design build
experience
Proven Work results with users & City
to design and construct a facility
that is functional & meets budget
We are honest & open(we have
hard discussions about costs)
Enjoyable to work with for the next
three years
Why Us?
questions
4L(I
F&H CONSTRUCTION
LDA Partners
❑ESIGNERS & ARCHITECTS
West