Text extracted from the city's file for reading and search. Open the original on pittsburgca.api.civicclerk.com. That file is the official record.

13Exported on April 17, 2023 3:41:48 PM PDT
104
DA Section Condition/Requirement Status Comments Action Items 139
Section 12.06 Construction. Each reference in this Agreement to this Agreement or any of the Project Approvals or Subsequent Approvals shall be deemed to refer to the Agreement, Project Approval or Subsequent Approval as it may be amended from time to time, whether or not the particular reference refers to such possible amendment. This Agreement has been reviewed and revised by legal counsel for both City and Developer, and no presumption or rule that ambiguities shall be construed against the drafting party shall apply to the interpretation or enforcement of this Agreement.

Compliant
140
Section 12.07 Other Miscellaneous Terms. The singular shall include the plural; the masculine gender shall include the feminine; “shall” is mandatory; “may” is permissive. If there is more than one signer of this Agreement, the signer obligations are joint and several.

Not Applicable
141
Section 12.08 Covenants Running with the Land. All of the provisions contained in this Agreement shall be binding upon the parties and their respective heirs, successors and assigns, representatives, lessees, and all other persons acquiring all or a portion of the Project, or any interest therein, whether by operation of law or in any manner whatsoever. All of the provisions contained in this Agreement shall be enforceable as equitable servitudes and shall constitute covenants running with the land pursuant to California law including, without limitation, California Civil Code § 1468. Each covenant herein to act or refrain from acting is for the benefit of or a burden upon the Project, as appropriate, runs with the Project Site and is binding upon the owner of all or a portion of the Project Site and each successive owner during its ownership of such property.

Not Applicable
142
Section 12.09 Notices. Any notice or communication required hereunder between City or Developer must be in writing, and may be given either personally, by fax (with original forwarded by regular U.S. Mail) by registered or certified mail (return receipt requested), or by FedEx or other similar courier promising overnight delivery. If personally delivered, a notice shall be deemed to have been given when delivered to the party to whom it is addressed. If given by facsimile transmission, a notice or communication shall be deemed to have been given and received upon actual physical receipt of the entire document by the receiving party’s facsimile machine. Notices transmitted by facsimile after 5:00 p.m. on a normal business day or on a Saturday, Sunday, or holiday shall be deemed to have been given and received on the next normal business day. If given by registered or certified mail, such notice or communication shall be deemed to have been given and received on the first to occur of (a) actual receipt by any of the addressees designated below as the party to whom notices are to be sent, or (b) five (5) days after a registered or certified letter containing such notice, properly addressed, with postage prepaid, is deposited in the United States mail. If given by Federal Express or similar courier, a notice or communication shall be deemed to have been given and received on the date delivered as shown on a receipt issued by the courier. Any party hereto may at any time, by giving ten (10) days written notice to the other party hereto, designate any other address in substitution of the address to which such notice or communication shall be given. Such notices or communications shall be given to the parties.

Compliant
143
Section 12.10 Entire Agreement, Counterparts And Exhibits. This Agreement is executed in two (2) duplicate counterparts, each of which is deemed to be an original. This Agreement consists of thirty-two (32) pages and three (3) exhibits which constitute in full, the final and exclusive understanding and agreement of the parties and supersedes all negotiations or previous agreements of the parties with respect to all or any part of the subject matter hereof. All waivers of any provisions of this Agreement shall be in writing and signed by the appropriate authorities of City and Developer. The following exhibits are attached to this Agreement and incorporated herein for all purposes: Exhibit A - Legal Description; Exhibit A-1 - Project Site Diagram; Exhibit B - Applicable Fees Not Applicable
144
Section 12.11 Recordation Of Development Agreement. Pursuant to California Government Code § 65868.5, no later than ten (10) days after City enters into this Agreement, the City Clerk shall record an executed copy of this Agreement, or Memorandum thereof, in the Official Records of the County of Contra Costa. The parties agree to cooperate as to preparation, execution, and recording of a Memorandum hereof.

See Comments/Action Items The DA was recorded at the Contra Costa County Clerk-Recorder on December 26, 2018 (DOC 2018-0205803-00)
145
146
147
148

Page 13 ends

13Exported on April 17, 2023 3:41:48 PM PDT
105
Resolution No. 23- 1 May 1, 2023

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Periodic Review of Liberty Subdivision )
Development Agreement Between The )
City of Pittsburg and Forecast Land ) R ESOLUTION NO. 23- Development, LLC and Determination )
as to Compliance With Development )
Agreement )

The Pittsburg City Council DOES RESOLVE as follows:

WHEREAS, a Development Agreement between the City of Pittsburg and Forecast La nd Investment, LLC , was executed on June 28, 2018, for the Liberty Subdivision; and

WHEREAS, California Government Code Section 65864 et seq. (“Development Agreement Statutes”) authorizes and regulates the execution of development agreements (“DAs") between certain public entities and persons who desire to develop private property within a public entity’s jurisdiction; and

WHEREAS, pursuant to the Development Agreement Statutes, the City established procedures for the consideration of DA applications by property owners or other persons having an interest in property within City’s jurisdiction; and

WHEREAS, Section 65865.1 requires City to conduct a periodic review of the City’s active Development Agreements, at which time each respective developer is required to demonstrate good faith compliance with the terms of the Devel opment Agreement (“Periodic Review”); and

WHEREAS, if, as a result of the Periodic Review, the City finds and determines, on the basis of substantial evidence, that a developer has not complied in good faith with the terms and conditions of the Development Agreement, the City may terminate or modify the DA pursuant to the Development Agreement Statutes; and

WHEREAS, t he last periodic review of t he Liberty Subdivision D evelopment Agreement was conducted , and on December 21 , 20 20, the City Counci l d etermined that the developer was in compliance with the terms of the Development Agreement.

NOW, THEREFORE, the City Council finds and determines as follows:

Section 1. Findings

The City Council hereby finds and determines that the above recitals are true and correct and have served as the basis, in part, for the findings and actions of the City 106
Resolution No. 23- 2 May 1, 2023

Council set forth below.

Section 2. Compliance with Development Agreement

The City Council hereby finds and determines that , based on the information provided by the Developer and City Staff, as well as the information contained in the "Liberty D A – 2022 Annual Review", attached hereto and incor porated herein by reference as "Exhibit 1, ” the Developer has demonstrated good faith compliance w ith the Liberty Development Agreement.

Section 3. Certificate of Compliance

The City Council hereby directs and authorizes the City Manager to issue a certificate codifying the " Finding of Compliance" for Liberty Subdivision Development Agreement in a form that can be recorded by the Developer.

Section 4. Certification

The City Clerk shall certify the adoption of this Resolution.

Section 5. Effective Date

This Resolution shall take effect immediately upon adoption.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 1st day of May, 2023, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

_____________________________
Shanelle Scales-Preston, Mayor

ATTEST:

______________________________
Alice E. Evenson, City Clerk

107
Exhibit 1 - Liberty DA - 2022 Annual Review Summary Table DA Section Condition/Requirement Status Comments Action Items 1 Article II - Effective Date; Term
2 Section 2.01 Effective Date. This Agreement shall become effective upon the date the ordinance approving this Agreement becomes effective (the “Effective Date”).

See Comments/Action Items The ordinance approving this development agreement was introduced by City Council on June 4, 2018 and adopted on June 18, 2018.
3 Section 2.02 Term. The term of this Agreement shall commence upon the Effective Date and continue for a period of ten (10) years (the “Term”). However, at such time as Developer has complied with all conditions in this Agreement, and upon the City Manager’s written authorization, this Agreement shall terminate and be of no further effect between the parties. The termination shall not alter any of the Project Approvals and related matters as to the Project.

See Comments/Action Items Based on the effective date of June 18, 2018, this development agreement would expire in 2028.
4 Article III - Obligations of
Developer
5 Section 3.01 Obligations of Developer Generally. The parties acknowledge and agree that the City’s agreement to perform and abide by the covenants and obligations of City set forth in this Agreement is a material consideration for Developer’s agreement to perform and abide by its long term covenants and obligations, as set forth herein. As material consideration for the long term assurances and vested rights provided by this Agreement and as a condition of approval to one or more of the Project Approvals, Developer agrees to each of the following:

Not Applicable
6 Section 3.02 Facility Reserve Charges. Developer agrees to pay City’s Facility Reserve Charges (“FRC”) as set or modified by the City Council from time to time.

Compliant These fees were paid as part of each building permit issued for the project.
7 Section 3.03 Water Infrastructure. Developer shall comply with the 2015 Water System Master Plan, as amended. Compliant 8 Section 3.04 Applicable Fees. City may levy development fees and charges during the term of this Agreement relative to the development of the Project Site which are in force and effect as of the Effective Date, or which are in effect at the time payment of those fees are due as more particularly described and according to the payment schedule set forth on Exhibit B (“Applicable Fees”). Unless otherwise provided in this Agreement, no development fees, or charges, or categories thereof, shall be imposed on the Project other than those fees (including categories within such fees), and charges identified as Applicable Fees on Exhibit B, which exhibit shall exclusively govern the Applicable Fee payment schedule. The parties agree that any and all Project development fees, charges or exactions related to schools, fire prevention, water, sewer, stormwater, and storm drainage facilities, which are to be paid by Developer directly to third-party governmental agencies, are not subject to or within the scope of this Agreement whether such third party charges exist or are subsequently imposed by such third parties, whether directly upon Developer or through City. This provision shall not be construed to benefit any Non-Assuming Transferees, as such term is defined in herein.

Compliant
9 Section 3.05 Applicable Fee Adjustments. Developer shall pay fees and charges consistent with Section 3.04 above, and the applicable adjustments currently provided in such fees, and as modified from time to time by the City, whether such adjustment or modification is an increase or decrease. Developer retains the right to challenge the imposition of any new fees not referenced in this Agreement or the modification, amendment or adjustment of all Applicable Fees pursuant to Government Code § 66000 et seq., not already authorized by ordinances, resolutions or policies in place at the time of this Agreement’s execution. Should the City Council approve a new AB 1600 fee study and/or authorize a decrease in any of the Applicable Fees during the term of this Agreement by ordinance or by resolution, Developer shall have the option, at its sole discretion, to pay the lower fee, as may be adjusted by the applicable CPI or ENR, unless otherwise bound by separate contract or memorandum of understanding with City. In no event shall Developer receive retroactive adjustments for lower fees.

Compliant
10 Section 3.06 City Local Traffic Mitigation Fee. Developer shall pay the City Local Traffic Mitigation Fee, which fee is necessary to finance unmet City traffic improvement needs in the amount in effect as of the Effective Date and subject to adjustment in accordance with Resolution No. 07-10917 with credit for certain improvements constructed by Developer per Section 4.04 below. If the City Council approves a new AB 1600 fee study and/or authorizes a decrease in any of the Applicable Fees during the term of this Agreement by ordinance or by resolution, Developer shall have the option, at its sole discretion, to pay the lower fee, as may be adjusted by the applicable CPI or ENR, unless otherwise bound by separate contract or memorandum of understanding with City. In no event shall Developer receive retroactive adjustments for lower fees.

Compliant These fees were paid as part of each building permit issued for the project.
11 Section 3.07 Regional Traffic Fee. Developer shall the ECCRFA Regional Transportation Development Impact Mitigation Fee (PMC Chapter 15.103) (the “RTDIM”) amount in effect when the Developer obtains a Building Permit. The RTDIM will be automatically increased or decreased on January 1 of each year based on the percent change in the Engineering News Record Construction Costs Index-San Francisco Bay Area between September 1 and September 1 of the preceding two calendar years.

Developer shall pay the fees prior to issuance of a Building Permit. If no Building Permit is required, then Developer shall pay the fees at a time consistent with PMC Section 15.103 in the amount in effect when the Project commences pursuant to PMC Section 15.103.

Compliant These fees were paid as part of each building permit issued for the project.
12 Section 3.08 Fees, Assessments and/or Taxes to be Paid by Developer. Developer agrees to pay its fair share of any levies imposed by any assessment district, landscaping and lighting district, community facilities district, tax-exempt financing mechanisms, or other funding mechanisms related to public safety; traffic; sewer; water; fire; the prevention, mitigation, abatement, or control of geologic hazards; or other infrastructure improvements (including, without limitation, design, acquisition, construction and maintenance costs) (collectively, “Funding Mechanisms”) within the Project Site, provided that such Funding Mechanism is referenced herein and/or was legally created pursuant to applicable law.

Compliant

Page 1 ends

12Exported on April 17, 2023 4:53:06 PM PDT
108
DA Section Condition/Requirement Status Comments Action Items 13 Section 3.09 Affordable Housing. Developer shall comply with PMC 18.86.080 by constructing six (6) rental secondary dwelling units within the Project. A covenant shall be recorded limiting the amount of rent that may be charged for these secondary units, consistent with the terms and conditions set forth in the affordable housing agreement. Prior to the City’s issuance of the first certificate of occupancy Developer agrees to enter into an affordable housing agreement with the City (the “Affordable Housing Agreement”) attached as Exhibit C which further memorializes the provisions of this Section

3.09 and is consistent with applicable law, including Pittsburg Municipal Code Chapter 18.50.

Developer agrees that the secondary dwelling units referenced in this Section shall not be built or otherwise allowed on adjoining lots without the prior written approval of the City Manager.

Compliant Deed-restricted ADUs built on Lot Nos. 7, 11, 16, 20, 26, and 42.

Staff has received copies of the Secondary Unit Regulatory Agreements for each of these ADUs.
14 a) Timing. The Affordable Housing Agreement shall establish provisions to implement the affordable housing requirements within this Agreement and shall include, but not be limited to, implementation and monitoring provisions to ensure compliance with municipal law related to affordable housing. The agreement shall include provisions for the reasonable reimbursement of costs to the City for the administration and monitoring of the agreement.

Compliant
15 b) Inclusionary Housing Ordinance. Notwithstanding any provision of this Agreement, in the event that the City has rescinded its respective previously adopted affordable housing ordinance and not replaced it with another affordable housing or similar ordinance, or such ordinance has been declared illegal, Developer shall not be obligated to comply with the provisions for affordable housing set forth in this Agreement. In the event, prior to or during the development of the Project, the City amends or replaces or eliminates its affordable housing ordinance which would result in a reduction in the number of secondary units Developer is obligated to construct, then the Affordable Housing Agreement shall be modified to provide for an equivalent reduction in the number of secondary units required to be constructed in the Project or elimination of the requirement.

Not Applicable The City has not rescinded its affordable housing ordinance as of the time of this periodic review.
16 Section 3.10 Security Improvements
17 a) Developer shall pay to the City the actual cost incurred by the City (not to exceed Fifty Thousand Dollars ($50,000.00) towards funding the acquisition and installation a security camera at the entrance to the Property or other location as determined by the City. The security cameras will be installed under the supervision of the City’s Police Chief. Developer shall pay such costs within thirty (30) days of receipt of invoice.

In Progress
18 b) Developer shall install the basic home security wiring implement wireless technology in the Project homes (defined herein as wiring for a basic home security system on the first floor windows and doors only). Developer shall offer one year of professional monitoring service to new homeowners.

The monitoring service shall be at the election of the new homeowner.

Compliant Planning staff inspected each home for compliance with this requirement prior to issuance of a certificate of occupancy. 19 Section 3.11 Solar Roof System. Developer shall install a solar roof system on one of its model homes for example purposes only (which may consist of a few panels with photovoltaic compatibility or other comparable technologies) and offer solar installation as an option at the homeowner’s expense.

Compliant The developer has installed pre-wiring for solar systems on all homes.
20 Section 3.12 The Developer shall replace any and all trees that are removed as part of the construction of the Project with the appropriate number of new trees pursuant to the City’s Tree Ordinance. Developer shall cause the Project to maintain said trees in an appropriate manner pursuant to the City’s Tree Ordinance.

Compliant To comply with the City's Tree Preservation Ordinance and the project's Tree Removal Permit, the developer has paid an in lieu fee of $4,800. Additionally, the developer has installed twelve (12), 24" box size trees along Central Avenue which will be designated protected trees. The trees have been mapped in the City's Protected Tree layer.
21 Section 3.13 Off-Site Improvements. Developer shall provide off-site improvements for a left turn lane from Central Avenue into the Project.

Compliant Planning staff confirmed there is a left turn lane from Central Avenue into the Project prior to issuance of last certificates of occupancy.
22 Article IV - Obligations of the
City
23 Section 4.01 Obligations of City Generally. The parties acknowledge and agree that Developer’s agreement to perform and abide by its covenants and obligations set forth in this Agreement, including Developer’s decision to process the siting of the Project in the City, is a material consideration for City’s agreement to perform and abide by the long term covenants and obligations of City, as set forth herein.

Not Applicable
24 Section 4.02 Availability of Public Services
25 a) General. To the extent permitted by law and consistent with its authority, City shall reserve such capacity for water services as may be necessary to serve the Project. This reservation of water infrastructure capacity shall be assured for the Term to the extent consistent with applicable law.

Compliant
26 b) Construction Water. City shall make construction water available to the Project by allowing the Project access to the City’s existing water supply infrastructure, at a location reasonably determined by the City, at Developer’s cost and on those terms and conditions and charges customarily applied by City to similar projects consistent with City standards. Developer shall provide backflow prevention for all points of connection to the City’s potable water supply system and the volume of water consumed shall be tracked with the use of a City-issued hydrant meter. City shall also allow Developer to install such temporary construction water pipelines and related infrastructure as reasonably necessary to provide construction water to the Project site for Developer’s use in any and all Project grading and construction operations, as long as such water is unrelated to potable use.

Compliant
27 Section 4.03 Developer’s Right to Rebuild. City agrees that Developer, in Developer sole’s discretion, may renovate or rebuild the Project within the Term of this Agreement should it become necessary due to natural disaster, changes in seismic requirements, acts of God, acts of terrorism, or damage to work in progress by reason of fire, floods or other casualties. Any such renovation or rebuilding shall be subject to the square footage and height limitations vested by this Agreement, and shall comply with the Project Approvals, the building codes existing at the time of such rebuilding or reconstruction, and the requirements of CEQA and this Agreement.

Compliant
28 Section 4.04 Reimbursement of Infrastructure Costs

Page 2 ends

12Exported on April 17, 2023 4:53:06 PM PDT
109
DA Section Condition/Requirement Status Comments Action Items 29 a) Reimbursement. Unless otherwise provided for herein, to the extent Developer incurs costs related to the planning and construction of traffic infrastructure, water delivery infrastructure, sewer infrastructure or other public infrastructure required by City or this Agreement for the Project that exceed the Project’s fair share obligation for such infrastructure, City shall reimburse Developer for the City’s portion of such costs (including any management fees provided for in this Agreement), subject to City’s prior verification through inspection of the construction that is subject to such reimbursement and upon final acceptance of the infrastructure by the City. This reimbursement shall be paid within sixty (60) days after City’s final acceptance or at such other time as mutually agreed upon in writing by the parties. Developer shall be entitled to a management fee of five percent (5%) for City’s share of approved infrastructure costs, including but not limited to design and special inspection costs. The management obligations of Developer hereunder shall include contracting and managing the construction of the infrastructure, retaining copies of records, photographs and “as builts” for the improvement(s) as well as attending meetings and providing necessary reports as reasonably requested by City.

Compliant
30 b) City’s Authorization of Reimbursement. Notwithstanding any other provision of this Section, or of this Agreement, or of VTM provisions, City shall not be responsible to reimburse or credit Developer for any costs, including as referenced in Section 4.04(a) herein, unless prior to Developer incurring any costs for which Developer will request reimbursement from City, Developer shall first provide written documentation as to the work to be performed, the estimated costs thereof, including a not-to-exceed cap, and such other details as reasonably requested by the City Manager and the City Manager approves the proposed costs and related work. If the City Manager fails to respond within thirty (30) days of its receipt of such estimated costs, Developer shall provide a second written notice to the City Manager and to the City Engineer, if neither responds within thirty (30) days of the City’s receipt of the second request, the request shall be deemed approved. The City Manager shall have the discretion to require Developer to obtain competitive bids on any work for which Developer may request reimbursement or credit from the City where the total cost (not just the City’s share) of that work is One Hundred Thousand Dollars ($100,000) or more. City shall also have the opportunity to inspect any and all infrastructure during its construction, as well as to review any work product for which Developer requests reimbursement or credits. If mutually agreed by the parties in writing, any reimbursement due Developer pursuant to this Agreement may be satisfied by City in the form of credits, which can actually be used by Developer to offset Developer’s payment of any Applicable Fees. In the event there are not enough credits to fully satisfy the reimbursement due Developer and subject to the terms of the mutual agreement between the parties referenced in the prior sentence, City shall reimburse Developer within thirty (30) days of invoicing.

Compliant
31 Section 4.05 Park In Lieu Fee. Developer and City agree that the park in-lieu fee valuation is currently Ten Dollars and Twenty Seven Cents per square foot ($10.27/sf unless City adopts a lower fee in which case the lower fee shall apply), increased annually by the CPI for the San Francisco-Oakland area, with the first increase implemented in January 2019 reflecting 2018 increases.

Compliant
32 Article V - Cooperation -
Implementation
33 Section 5.01 Processing Application for Subsequent Approvals. The parties agree that all Subsequent Approvals shall be processed by City in a manner consistent with the following provisions:
34 a) Standard of Review. By adopting the Project Approvals, City has made a final policy decision that the Project is in the best interests of the public health, safety and general welfare. Accordingly, City shall not use its discretionary authority in considering any application for a Subsequent Approval to change the policy decisions reflected by the Project Approvals or otherwise prevent or delay development of the Project as set forth in the Project Approvals. Instead, the Subsequent Approvals shall be deemed tools to implement those final policy decisions and shall be issued by City so long as they comply with this Agreement and Applicable Law, as defined below, and are not inconsistent with the Project Approvals as set forth above, and meet the intent and comply with any City adopted Designed Guidelines, as applicable. To the extent permitted by law, City shall not use its discretionary authority in considering these Subsequent Approval applications to revisit or frustrate the policy decisions or material terms reflected by the Project Approvals. Developer agrees that development under this Agreement shall comply with provisions reflected in Uniform Codes (whether building, fire, plumbing, or other applicable uniform codes) which may adopted subsequent to the Effective Date of this Agreement.

Compliant
35 b) Basis for Denial. City may deny an application for a Subsequent Approval only if such application does not comply with this Agreement or Applicable Law, defined below, or does not substantially comply with the Project Approvals (provided, however, that inconsistency with the Project Approvals shall not constitute grounds for denial of a Subsequent Approval which is requested by Developer as an amendment to that Project Approval). City may approve an application for such a Subsequent Approval subject to any conditions necessary to bring the Subsequent Approval into compliance with this Agreement or Applicable Law, or as is necessary to make this Subsequent Approval consistent with the Project Approvals. If City denies any application for a Subsequent Approval, City shall specify in writing the reasons for such denial and may suggest a modification which would be approved by City.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
36 Section 5.02 Timely Submittals by Developer. Developer acknowledges that City cannot expedite processing of the Subsequent Approvals until Developer submits complete applications on a timely basis.

Developer shall use its best efforts to (i) provide to City in a timely manner any and all documents, applications, plans, and other information necessary for City to carry out its obligations hereunder; and (ii) cause Developer’s planners, engineers, and all other consultants to provide to City in a timely manner all such documents, applications, plans and other necessary materials as set forth in the Applicable Law. It is the express intent of Developer and City to cooperate and diligently work to obtain any and all Subsequent Approvals consistent with this Agreement.

Compliant

Page 3 ends

12Exported on April 17, 2023 4:53:06 PM PDT
110
DA Section Condition/Requirement Status Comments Action Items 37 Section 5.03 Timely Processing by City. Upon submission by Developer of all appropriate applications and processing fees for any Subsequent Approval, City shall promptly and diligently commence and complete all steps necessary to act on the Subsequent Approval applications including, without limitation, (i) providing at Developer’s expense and subject to Developer’s request and prior written approval, reasonable overtime staff assistance and/or staff consultants for planning and processing of each Subsequent Approval application; (ii) if legally required, providing notice and holding public hearings; and (iii) acting on any such Subsequent Approval application. If Developer elects to request and approve the use of overtime staff assistance or staff consultants for planning and processing of any Subsequent Approval pursuant to this Section 5.03, Developer’s reimbursement to City for such services shall be made in amount equal to City’s actual costs of providing such services, in accordance with standard City practice.

Compliant
38 Section 5.04 Other Government Permits. At Developer’s sole discretion and in accordance with Developer’s construction schedule, Developer shall apply for such other permits and approvals as may be required by other governmental or quasi-governmental entities in connection with the development of, or the provision of services to, the Project. City shall cooperate with Developer in its efforts to timely obtain such permits and approvals and shall, from time to time, at the request of Developer, use its best efforts to ensure the timely availability of such permits and approvals.

Compliant
39 Section 5.05 Landscaping and Lighting District, Park Maintenance, C.3 Facilities. 40 a) Developer agrees that the Project Site will be annexed into the City’s existing Community Facilities District 2007-1 (Park Maintenance Services), and the City’s Community Facilities District 2016-1 (Maintenance of Project Facilities) for maintenance of off-site C.3 facilities. This process shall be completed to the satisfaction of the City Manager and City Attorney prior to the recordation of the first final map for the project. Each legal residential lot located within the Project Site will be required to pay the levy by the CFD no earlier than the issuance of a building permit for such lot. Developer understands that the project Site is included in the City’s existing Citywide Landscaping and Lighting Assessment District, as established pursuant to City Resolution No. 88-7324 (“LLD”)., To the extent permitted by law, that the Project shall be assessed in a manner consistent with the provisions herein.

Compliant
41 b) Developer agrees that the base assessment applies to the Project and is subject to increase, provided any such increase of the base assessment imposed uniformly or similarly situated properties by City in a manner consistent with State law. Developer further agrees that the base assessment shall be levied upon recordation of each of the Project’s final maps. The parties agree that the base LLD assessment described herein shall finance, among other things, the maintenance of any and all landscape improvements and the maintenance of the parks.

Compliant
42 Section 5.06 Police Services CFD. Developer agrees to take all steps necessary to include the Project Site into the City’s existing police services Community Facilities District 2005-1, as adopted pursuant to Resolution No. 05-10342 (Public Safety Services) at no cost to the City, to provide for police services for the Project Site. This process shall be completed to the satisfaction of the City Manager and the City Attorney, before recordation of the first final map for the Project. Each legal residential lot located on the Project Site will be required to pay the levy by the Police Services District no earlier than the issuance of a building permit for such lot.

Compliant
43 Section 5.07 Fire Services CFD. Developer agrees to annex the Project Site into the City’s existing Community Facilities District 2017-1 (Fire Facilities and Fire Safety and Emergency Services), as adopted pursuant to Resolution No. 17-13311, at no cost to the City, to provide fire protection and emergency services for the Project Site. This process shall be completed to the satisfaction of the City Manager, prior to the recordation of the first final map for the Project. Each legal residential lot located on the Project Site will be required to pay the levy by the CFD no earlier than the issuance of a building permit for such lot.

Compliant
44 Section 5.08 Parkland Dedication In-Lieu Fee. The Developer shall pay an In-Lieu Parkland Dedication Fee on a per permit basis to the Engineering Department prior to the issuance of a building permit for the project per PMC section 17.32.020.D.2. Developer shall receive a fee credit for fifty percent of the acreage of the private tot lot provided for the project. The park in-lieu fee valuation is currently ten dollars and twenty seven Cents per square foot ($10.27/sf), increased annually by the CPI for the San Francisco-Oakland area, with the first increase implemented in January 2019 reflecting 2018 increases. With the applied credit, Developer shall pay an in-lieu fee of $7,917 per dwelling unit.

Compliant These fees were paid as part of each building permit issued for the project.
45 Section 5.10 Assessment Districts or Other Funding Mechanisms. 46 a) City understands that City’s long term assurances to Developer concerning fees, taxes and assessments related to the Project are a material consideration for Developer agreeing to process the siting of the Project in its present location and to pay the fees, taxes and assessments described in this Agreement. City shall retain the ability to initiate or process applications for the formation of new assessment districts or other Funding Mechanisms, as defined in Section 3.08 of this Agreement, covering all or any portion of the Project site. Notwithstanding the foregoing, Developer retains all its rights to oppose the formation or proposed assessment of any new assessment district, Funding Mechanism, or any and all increases thereto, or to request or pursue assessment credits or reductions, unless otherwise provided for herein or unless such assessment, Funding Mechanism or related increases are in place and legally effective as of the date of this Agreement’s Effective Date.

Compliant
47 b) At the request of Developer, City shall cooperate in the formation of, or annexation to, those assessment districts, landscaping and lighting districts, community facilities districts, tax-exempt financing mechanisms, or other Funding Mechanisms that Developer and City determine are needed to fund infrastructure improvements and to ensure the orderly development of the Project, at no cost to the City. City shall diligently and expeditiously process applications by Developer necessary to establish such Funding Mechanisms as long as (i) the application complies with law, (ii) is consistent with City’s standards, and (iii) provides for a lien to value ratio and other financial terms that are reasonably acceptable to City, and which will result in no commitment of City. City shall diligently seek to sell any bonds to be issued and secured by such assessments upon the best terms reasonably available in the marketplace. Any and all costs associated with this Section shall be borne and/or advanced by Developer.

Compliant

Page 4 ends

12Exported on April 17, 2023 4:53:06 PM PDT
111
DA Section Condition/Requirement Status Comments Action Items 48 Section 5.11 Warranty Bonds. Developer agrees that every infrastructure improvement dedicated to City (except landscaping, unimproved real property or open space dedications) pursuant to this Agreement shall be accompanied by a one (1) year warranty bond in a form and in an amount, and with a surety acceptable to City, or otherwise as determined in the applicable Subdivision Improvement Agreement.

Compliant
49 Section 5.12 General Plan Maintenance Fee. Developer agrees to pay a development related fee to help fund the maintenance of the Pittsburg General Plan. The General Plan Maintenance Fee will be $125.00 per building permit.

In Progress These fees were paid as part of each building permit issued for the project.
50 Section 5.13 Refuse Management Plan. Prior to issuance of the first building permit, Developer shall submit to, and receive written approval from, the City Planning Manager of a proposed refuse management plan addressing, among other matters, the routes for the solid waste company servicing the Project to access and otherwise provide service to the Project.

Compliant
51 Article VI - Standards, Laws and
Proceedures Governing the Project
52 Section 6.01 Vested Right to Develop. Developer shall have a vested right to develop the Project on the Project Site in substantial conformance with the terms and conditions of this Agreement, the Project Approvals (as and when issued), the Subsequent Approvals (as and when issued), and amendments thereto as shall, from time to time, be approved pursuant to this Agreement. Nothing in this Section

6.01 shall be deemed to eliminate or diminish the requirement of Developer to obtain any required Subsequent Approvals.

Compliant
53 Section 6.02 Permitted Uses Vested by This Agreement. The permitted uses of the Project Site; the density and intensity of use of the Project Site; the maximum height, bulk and size of proposed buildings; provisions for reservation or dedication of land for public purposes and the location of public improvements; the general location of public utilities; and other terms and conditions of development applicable to the Project, shall be as set forth in the Project Approvals and, as and when they are issued (but not in limitation of any right to develop as set forth in the Project Approvals), the Subsequent Approvals.

Compliant
54 Section 6.03 Applicable Law. “Applicable Law” shall mean the existing rules, regulations, official policies, standards and specifications governing permitted uses of the project site; governing density; and governing design, improvements, and construction standards and specifications applicable to the Project and Project site as set forth in this Agreement and the Project Approvals, and in force and effect on the Effective Date of this Agreement. However, this Agreement and this Section shall not be construed to prevent the City, in any subsequent actions applicable to the Project Site, from applying any new rules, regulations, official policies, standards, and specifications that do not conflict with those rules, regulations, official policies, standards, and specifications existing as of the Effective Date of the Agreement.

Compliant
55 Section 6.04 Uniform Codes. Notwithstanding any other provision of this Agreement, City may apply to the Project Site, at any time during the Term, the then current Uniform Building Code and other uniform construction codes as properly modified by City and uniformly applied on a citywide basis, and City’s then current design and construction standards for road and storm drain facilities. In no event shall any such uniform code or standard be adopted for the purpose of preventing or otherwise limiting construction of all or any part of the Project.

Compliant
56 Section 6.05 Moratorium and Conflicting Enactments. To the extent consistent with State Law, if any ordinance, resolution or other measure is enacted, whether by action of City, by initiative, referendum, or otherwise, that imposes a building moratorium, a limit on the rate of development, or a voter-approval requirement which would otherwise affect the timely development of the Project on all or any part of the Project Site, City agrees that such ordinance, resolution or other measure shall not apply to the Project, the Project Site, this Agreement, the Project Approvals, or the Subsequent Approvals, if any, during the term of this Agreement, unless the building moratorium is imposed as part of a declaration of a local emergency or state of emergency as defined in Government Code Section 8558. Developer reserves the right to challenge in court any City action or inaction which Developer believes is in conflict with Applicable Law or this Agreement.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
57 Section 6.06 Life of Subdivision Maps, Development Approvals, and Permits. To the extent consistent with Applicable Law, the term of any subdivision map or any other map, permit, rezoning or other land use entitlement approved as a Project Approval or Subsequent Approval shall automatically be extended for the duration of this Agreement, including any extensions. The term of this Agreement and any subdivision map or other Project Approval or Subsequent Approval shall not include any period of time during which any applicable development moratorium (including, but not limited to, a water or sewer moratorium) or the actions of other public agencies that regulate land use, development or the provision of services to the land, prevents, prohibits or delays the construction of the Project. The term of this Agreement and any subdivision map or other Project Approval or Subsequent Approval shall not include any period of time during which any applicable court order or other legal requirement prevents the processing of any Subsequent Approval or prevents any Project development activities Compliant
58 Section 6.07 State and Federal Law. As provided in California Government Code § 65869.5, if any state or federal laws or regulations, enacted after this Agreement’s Effective Date prevent or preclude compliance with one or more provisions of this Agreement (“Changes in the Law”), such provision of the Agreement shall be modified or suspended as may be necessary to comply with such state or federal laws or regulations as may be necessary to comply with Changes in the Law, and City and Developer shall take such action as may be required pursuant to this Agreement including, without limitation, Article V and Section 10.05. Not in limitation of the foregoing, nothing in this Agreement shall preclude City from imposing on Developer any fee specifically required by State or Federal laws and regulations.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
59 Section 6.08 Timing of Project Construction and Completion.

Page 5 ends

12Exported on April 17, 2023 4:53:06 PM PDT
112
DA Section Condition/Requirement Status Comments Action Items 60 a) Project Phasing. The Project may be built in phases in response to then-existing market conditions over the Term of the Agreement. Except as otherwise specifically provided by this Agreement with respect to Project infrastructure timing, City and Developer expressly agree that there is no requirement that Developer initiate or complete development of the Project or any particular phase of the Project within any particular period of time, and City shall not impose such a requirement on any Project Approval. The parties acknowledge that Developer cannot at this time predict when or the rate at which or the order in which phases will be developed. Such decisions depend upon numerous factors which are not within the control of Developer, such as market demand, interest rates, competition and other similar factors.

Compliant The project is completely built-out.
61 b) The parties agree that Developer shall be able to develop in accordance with Developer’s own time schedule as such schedule may exist from time to time, and Developer shall determine which part of the Project Site to develop first, and at Developer’s chosen schedule. In particular, and not in limitation of any of the foregoing, since the California Supreme Court held in Pardee Construction Co. v. City of Camarillo, 37 Cal.3d 465 (1984), that the failure of the parties therein to consider and expressly provide for the timing of development resulted in a later-adopted initiative restricting the timing of development to prevail over such parties’ agreement, it is the parties’ desire to avoid that result by acknowledging that Developer shall have the right to develop the Project in such order and at such rate and at such times as Developer deems appropriate within the exercise of its subjective business judgment. Developer’s rights under this Section 6.08(b) shall be subject to the requirement that adequate infrastructure to serve each phase of the Project is constructed concurrently with such phase. The City Manager shall reasonably determine what infrastructure will be required to serve each phase of the Project, which determination shall be consistent with Applicable Law.

Compliant
62 c) Nothing in this Agreement shall exempt Developer from completing work required by a subdivision agreement, road improvement agreement or similar agreement in accordance with the terms thereof.

Compliant
63 Section 6.09 Exempting Fees, Mitigation Measures and Similar Requirements Imposed by Outside Agencies.

Notwithstanding any other provision of this Agreement, the City agrees to exclude Developer from any and all discretionary collection agreements regarding fees, mitigation measures and similar requirements including, but not limited to, development impact fees, which other public agencies request the City to impose at City’s discretion on the Project or on the Project Site after the Effective Date through the Term of this Agreement. This Section 6.09 shall not prohibit the City from imposing on Developer any fee, mitigation measure or similar requirement or obligation that is required by a local or regional agency in accordance with local, regional, State or Federal obligations and implemented by the City in cooperation with such local, regional, state or federal agency, provided such fee, mitigation measure or similar requirement or obligation is imposed in a similar manner on similarly situated properties within the City as, for example, stormwater-related C.3 requirements and increases thereto.

Compliant
64 Section 6.10 City’s Joint-Inspection Jurisdiction. Developer acknowledges that City has joint inspection jurisdiction within other third-party governmental entities within any and all City rights-of-way and easements.

Compliant
65 Article VII - Amendment
66 Section 7.01 Amendment to Project Approvals, Subsequent Approvals. To the extent permitted by State and Federal law, any Project Approval or Subsequent Approval may, from time to time, be amended or modified in the following manner:

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
67 a) Administrative Project Amendments. Upon the written request of Developer for an amendment or modification to a Project Approval or Subsequent Approval, the City Manager or his/her designee shall determine: (i) whether the requested amendment or modification is minor when considered in light of the Project as a whole; and (ii) whether the requested amendment or modification is consistent with this Agreement, Applicable Law, applicable uniform codes and State or Federal law. If the City Manager or his/her designee finds that the proposed amendment or modification is minor in the context of the entire Project, consistent with this Agreement and Applicable Law, and will result in no new significant environmental impacts not addressed and mitigated in the EIR, the amendment shall be determined to be an “Administrative Project Amendment” and the City Manager or his/her designee may, except to the extent otherwise required by law, approve the Administrative Project Amendment without notice and public hearing. Without limiting the generality of the foregoing, lot line adjustments, reductions in the density, intensity, scale or scope of the Project, minor alterations in vehicle circulation patterns or vehicle access points, changes in trail alignments, minor variations in lot layouts, substitutions of comparable landscaping for any landscaping shown on any final development plan or landscape plan, variations in the location of structures that do not substantially alter the design concepts of the Project, variations in the location or installation of utilities and other infrastructure connections or facilities that do not substantially alter the design concepts of the Project, and minor adjustments to the Project Site diagram or Project Site legal description shall be treated as Administrative Project Amendments.

Not Applicable
68 b) Non-Administrative Project Amendments. Any request of Developer for an amendment or modification to a Project Approval or Subsequent Approval which is determined not to be an Administrative Project Amendment as set forth above shall be subject to review, consideration and action pursuant to the Applicable Law and this Agreement.

Not Applicable
69 Section 7.02 Amendment of this Agreement. This Agreement may be amended from time to time, in whole or in part, by mutual written consent of the parties hereto or their successors in interest, as follows:

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
70 a) Administrative Agreement Amendments. The City Manager, or his/her designee, may, except to the extent otherwise required by law, enter into certain amendments of this Agreement on behalf of the City as long as any such amendment does not substantially affect (i) the Term of this Agreement, (ii) permitted uses of the Project Site, (iii) provisions for the reservation or dedication of land, (iv) conditions, terms, restrictions or requirements for subsequent discretionary actions, (v) the density or intensity of use of the Project Site or the maximum height or size of proposed buildings or (vi) monetary contributions by Developer (“Administrative Agreement Amendment”), and shall not, except to the extent otherwise required by law, require notice or public hearing before the parties may execute an amendment hereto. For purposes of this Section 7.02(a), the term “substantially affect” shall be evaluated in the context of the entire Project.

Not Applicable

Page 6 ends

12Exported on April 17, 2023 4:53:06 PM PDT
113
DA Section Condition/Requirement Status Comments Action Items 71 b) Amendment Exemptions. No amendment of a Project Approval or Subsequent Approval, whether done administratively or not, shall require an amendment to this Agreement. Instead, any such matter automatically shall be deemed to be incorporated into the Project and vested under this Agreement when written and executed by both parties.

Not Applicable
72 c) Amendment Limitations. In consideration of the scope of the benefits to City set forth in this Agreement, any amendment to this Agreement shall only be subject to such new terms and conditions, including new exactions or other obligations, as are reasonably related to the impacts on City directly attributable to such amendment.

Not Applicable
73 Article VIII - Assignment,
Transfer and Notice
74 Section 8.01 Assignment of Interests, Rights and Obligations. Developer may transfer or assign all or any portion of its interests, rights or obligations under this Agreement, the Project Approvals or Subsequent Approvals to third parties acquiring an interest or estate in the Project or any portion thereof including, without limitation, purchasers or ground lessees of lots, parcels or facilities.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
75 Section 8.02 Transfer Agreements See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
76 a) In connection with the transfer or assignment by Developer of all or any portion of the Project (other than a transfer or assignment by Developer to an affiliated party, any deed of trust beneficiary or mortgagee, or a “Non-Assuming Transferee” (as defined in Section 8.03), Developer and the transferee shall enter into a written agreement (a “Transfer Agreement”) regarding the respective interests, rights and obligations of Developer and the transferee in and under the Agreement, the Project Approvals, and the Subsequent Approvals. Such Transfer Agreement may (i) release Developer from obligations under the Agreement, the Project Approvals, or the Subsequent Approvals that pertain to that portion of the Project being transferred or assigned, as described in the Transfer Agreement, provided that the transferee expressly assumes such obligations, (ii) transfer to the transferee vested rights to improve that portion of the Project being transferred and (iii) address any other matter deemed by Developer to be necessary or appropriate in connection with the transfer or assignment.

Not Applicable
77 b) Any Transfer Agreement shall be binding on Developer, City and the transferee and, unless otherwise provided for in Section 8.03 of this Agreement, shall require the City’s prior written consent, which consent shall not be unreasonably withheld. Failure by City to respond within thirty (30) days of a written request by Developer for City’s consent shall be deemed City’s approval of the Transfer Agreement in question. City may refuse to give its consent only if, in light of the proposed transferee’s reputation and financial resources, such transferee would not in City’s reasonable determination be able to perform the obligations proposed to be assumed by such transferee. Such determination shall be made by the City Manager and is appealable to the City Council. In no event, however, shall City refuse to give its consent to a proposed transferee pursuant to this Section

8.02(b) if such transferee has a net worth of at least Ten Million Dollars ($10,000,000) documented in a manner reasonably acceptable to City. Upon recordation of any Transfer Agreement in the Official Records of Contra Costa County, Developer shall automatically be released from those obligations assumed by the transferee therein.

Not Applicable
78 c) Developer shall be free from any and all liabilities accruing on or after the date of any assignment or transfer with respect to those obligations assumed by a transferee pursuant to a Transfer Agreement.

No breach or default hereunder by any person succeeding to any portion of Developer’s obligations under this Agreement shall be attributed to Developer, nor may Developer’s rights hereunder be canceled or diminished in any way by any breach or default by any such person.

Not Applicable
79 Section 8.03 Non-Assuming Transferees. Except as otherwise required by Developer in Developer’s sole discretion, the burdens, obligations and duties of Developer under this Agreement shall terminate with respect to, and neither a Transfer Agreement nor City’s consent shall be required in connection with (i) any single residential parcel conveyed to a purchaser, (ii) any property transferred as fewer than ten (10) lots to a single retail builder or (iii) any property that has been established as one or more separate legal parcels for office, commercial, open space, park, school or other nonresidential uses. The transferee in such a transaction and its successors (“Non-Assuming Transferees”) shall be deemed to have no obligations under this Agreement, but shall continue to benefit from the vested rights provided by this Agreement for the duration of the Term. Nothing in this Section 8.03 shall exempt any property transferred to a Non-Assuming Transferee from payment of applicable fees and assessments or compliance with applicable conditions of approval.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
80 Section 8.04 Notice of Compliance Generally. Subject to City’s finding that the facts contemplated by clauses (i) through (iii) herein are true and accurate, within thirty (30) days following any written request which Developer may make from time to time, City shall execute and deliver to Developer (or to any party requested by Developer) a written “Notice of Compliance,” in recordable form, duly executed and acknowledged by City, that certifies that (i) this Agreement is unmodified and in full force and effect, or if there have been modifications hereto, that this Agreement is in full force and effect as modified and stating the date and nature of such modifications, (ii) there are no current uncured defaults under this Agreement or specifying the dates and nature of any such default, and (iii) any other information reasonably requested by Developer. City’s failure to deliver such notice within such time period shall constitute a conclusive presumption against City that this Agreement is in full force and effect without modification except as may be represented by the Developer and that there are no uncured defaults in the performance of the Developer, except as may be represented by the Developer. Developer shall have the right at Developer’s sole discretion, to record the Notice of Compliance.

See Comments/Action Items As of December 31, 2022 there was no need to exercise the provisions of this subsection.
81 Article IX - Cooperation in the
Event of Legal Challenge
82 Section 9.01 Cooperation

Page 7 ends

12Exported on April 17, 2023 4:53:06 PM PDT
114
DA Section Condition/Requirement Status Comments Action Items 83 a) Developer agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents and consultants from any and all administrative, legal or equitable actions or other proceedings instituted by any person not a party to this Agreement challenging the validity of the Agreement or any Project Approval or any Subsequent Project Approval, or otherwise arising out of or stemming from this Agreement. Developer may select its own legal counsel to represent Developer’s interests at Developer’s sole cost and expense. The parties shall cooperate in defending such action or proceeding. Developer shall pay for City's costs of defense, whether directly or by timely reimbursement on a monthly basis. Such costs shall include, but not be limited to, all court costs and attorneys' fees expended by City in defense of any such action or other proceeding, plus staff and City Attorney time spent in regard to defense of the action or proceeding. The parties shall use best efforts to select mutually agreeable defense counsel but, if the parties cannot reach agreement, City may select its own legal counsel and Developer agrees to pay directly or timely reimburse on a monthly basis City for all such court costs, attorney fees, and time referenced herein.

Compliant
84 b) Developer also agrees to indemnify, defend and hold harmless the City, its officials, officers, employees, agents and consultants from any claims, costs, damages or other liabilities for any personal injury or death, or property damage, resulting from the construction of the Project or of operations by the Developer, its officers, employees, agents or consultants, under this Agreement, except for such claims, costs, damages, or other liabilities which are caused by the sole or gross negligence of the City, its officials, officers, employees, agents, or consultants. Developer may select its own legal counsel to represent Developer’s interests at Developer’s sole cost and expense.

Compliant
85 c) The parties agree that this Section 9.01 shall constitute a separate agreement entered into concurrently, and that if any other provision of this Agreement, or the Agreement as a whole, is invalidated, rendered null, or set aside by a court of competent jurisdiction, the parties agree to be bound by the terms of this Section 9.01, which shall survive such invalidation, nullification or setting aside.

Compliant
86 Section 9.02 Cure; Reapproval
87 a) If, as a result of any administrative, legal or equitable action or other proceeding as described in Section 9.01, all or any portion of this Agreement, Project Approvals, or Subsequent Approvals are set aside or otherwise made ineffective by any judgment (a “Judgment”) in such action or proceeding (based on procedural, substantive or other deficiencies, hereinafter “Deficiencies”), the parties agree to use their respective best efforts to sustain and reenact or readopt this Agreement, Project Approvals, and/or Subsequent Approvals that the Deficiencies relate to, as follows, unless the parties mutually agree in writing to act otherwise:

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
88 i) If any Judgment requires reconsideration or consideration by City of this Agreement, Project Approval, or Subsequent Approval, then the City shall consider or reconsider that matter in a manner consistent with the intent of this Agreement. If any such Judgment invalidates or otherwise makes ineffective all or any portion of this Agreement or any Project Approval, or Subsequent Approval, then the parties shall cooperate and shall cure any Deficiencies identified in the Judgment or upon which the Judgment is based in a manner consistent with the intent of this Agreement and the Judgment.

Upon the parties cure of such Deficiencies, City shall then take steps consistent with the Judgment necessary readopt or reenact this Agreement and any applicable Project Approval, Subsequent Approval, or any portion thereof.

Not Applicable
89 ii) Acting in a manner consistent with the intent of this Agreement or a Judgment includes, but is not limited to, recognizing that the parties intend that Developer may develop a fifty seven (57) single- family residential unit project, and adopting such ordinances, resolutions, and other enactments, including but not limited to a general plan amendment, rezoning, vesting subdivision map approvals, development plan approvals, PD Plan approvals, design review, improvement agreements, use permits, grading permits, building permits, lot line adjustments, sewer and water connection permits, certificates of occupancy, final development plans, development agreements, permits, resubdivisions, and any amendments to, or repealing of, any of the foregoing as are necessary to readopt or reenact all or any portion of this Agreement, Project Approvals, and/or Subsequent Approvals without contravening the Judgment.

Not Applicable
90 b) The parties agree that this Section 9.02 shall constitute a separate agreement entered into concurrently, and that if any other provision of this Agreement, or the Agreement as a whole, is invalidated, rendered null, or set aside by a court of competent jurisdiction, the parties agree to be bound by the terms of this Section 9.02, which shall survive such invalidation, nullification or setting aside.

Not Applicable
91 Article X - Default, Remidies,
Termination

Page 8 ends

12Exported on April 17, 2023 4:53:06 PM PDT
115
DA Section Condition/Requirement Status Comments Action Items 92 Section 10.01 Defaults. Any failure by either party to perform any term or provision of this Agreement, which failure continues uncured for a period of thirty (30) days following written notice of such failure from the other party (the “Complaining Party”) (unless such period is extended by mutual written consent), shall constitute a default under this Agreement. The Complaining Party’s notice (“Default Notice”) shall specify the nature of the alleged failure and, may specify the manner in which the failure satisfactorily may be cured By the other party (the “Defaulting Party”). Any failures or delays by a Complaining Party in asserting any of its rights and remedies as to any default shall not operate as a waiver of a default or of any such rights or remedies. Delays by a Complaining Party in asserting any of its rights and remedies shall not deprive the Complaining Party of its right to institute and maintain any actions or proceedings, which it may deem necessary to protect, assert, or enforce any such rights or remedies. If the nature of the alleged failure is such that it cannot reasonably be cured within such 30-day period, then no fault shall be deemed to have occurred if: (a) the cure shall be commenced at the earliest practicable date following receipt of the Default Notice; (b) the cure is diligently prosecuted to completion at all times thereafter; (c) at the earliest practicable date (if no event later than thirty (30) days after the Defaulting Party’s receipt of the Default Notice), the Defaulting Party provides written notice to the Complaining Party that the cure cannot practicably be completed within such 30-day period; and (d) the cure is completed at the earliest practicable date. In no event shall Complaining Party be precluded from exercising remedies if a default is not cured within one hundred twenty (120) days after the Notice of Default is given. Complaining Party shall not send notice to any third party, including, but not limited to, bonding and surety companies, until such time as the cure opportunities set forth above have expired unless otherwise required by applicable law. Upon the occurrence of a default under this Agreement, the Complaining Party may institute legal proceedings to enforce the terms of this Agreement or, in the event of a material default, terminate this Agreement. If the default is cured consistent with this Section, then no default shall exist and the Complaining Party shall take no further action.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
93 Section 10.02 Termination. If City elects to consider terminating this Agreement due to a material default of Developer, then City shall give a notice of intent to terminate this Agreement and the matter shall be scheduled for consideration and review by the City Council at a duly noticed and conducted public hearing. As used herein, a finding of materiality shall be based on the effect of the default in relation to the size and scope of the Project. Developer shall have the right to offer written and oral evidence prior to or at the time of said public hearings. If the City Council determines that a material default has occurred and is continuing, and elects to terminate this Agreement, City shall give written notice of termination of this Agreement to Developer by certified mail and this Agreement shall thereby be terminated sixty (60) days thereafter; provided, however, that if Developer files an action to challenge City’s termination of this Agreement within such 60-day period, then this Agreement shall remain in full force and effect until a trial court has affirmed City’s termination of this Agreement and all appeals have been exhausted (or the time for requesting any and all appellate review has expired).

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
94 Section 10.03 Periodic Review
95 a) Conducting the Periodic Review. Throughout the Term of this Agreement, at least once every twelve (12) months following the execution of this Agreement, City shall review the extent of good-faith compliance by Developer with the terms of this Agreement. This review (the “Periodic Review”) shall be conducted by the City Manager or his/her designee and shall be limited in scope to compliance with the terms of this Agreement pursuant to California Government Code § 65865.1. Developer also agrees to pay City annually the greater of Five Thousand Dollars ($5,000) or the actual cost of Periodic Review Fee (not to exceed Ten Thousand Dollars ($10,000)). The Five Thousand Dollars ($5,000) shall be increased annually thereafter by the CPI for the San Francisco Oakland Area, with the first increase implemented in January 2019 reflecting 2018 increases. Such Periodic Review Fee shall only be paid in the years in which a Periodic Review is actually conducted.

In Progress
96 b) Notice. At least ten (10) days prior to the Periodic Review, and in the manner prescribed in Article XII of this Agreement, City shall deposit in the mail to Developer a copy of any staff reports and documents to be used or relied upon in conducting the review and, to the extent practical, related exhibits concerning Developer’s performance hereunder. Developer shall be permitted an opportunity to respond to City’s evaluation of Developer’s performance, either orally at a public hearing or in a written statement, at Developer’s election. Such response shall be made to the City Manager.

Compliant Notice of the Annual Review was given to the Developer on March 17, 2023.
97 c) Good Faith Compliance. During the Periodic Review, the City Manager shall review Developer’s good-faith compliance with the terms of this Agreement. At the conclusion of the Periodic Review, the City Manager shall make written findings and determinations, on the basis of substantial evidence, as to whether or not Developer has complied in good faith with the terms and conditions of this Agreement. The decision of the City Manager shall be appealable to the City Council. If the City Manager finds and determines that Developer has not complied with such terms and conditions, the City Manager may recommend to the City Council that it terminate or modify this Agreement by giving notice of its intention to do so, in the manner set forth in California Government Code §§ 65867 and 65868. The costs incurred by City in connection with the Periodic Review process described herein shall be shared equally by Developer and City.

Compliant
98 d) Failure to Properly Conduct Periodic Review. If, after thirty (30) days following Developer’s notice requesting a Periodic Review, City fails to initiate the Periodic Review, such failure shall be conclusively deemed an approval by City of Developer’s compliance with the terms of this Agreement.

Not Applicable
99 e) Written Notice of Compliance. With respect to any year for which Developer has been determined or deemed to have complied with this Agreement, City shall, within thirty (30) days following a written request by Developer, provide Developer with a written notice of compliance, in recordable form, duly executed and acknowledged by City. Developer shall have the right, in Developer’s sole discretion, to record such notice of compliance.

In Progress

Page 9 ends

12Exported on April 17, 2023 4:53:06 PM PDT
116
DA Section Condition/Requirement Status Comments Action Items 100
Section 10.04 Excusable Delay; Extension of Time of Performance. In addition to specific provisions of this Agreement, neither party shall be deemed to be in default where delays in performance or failures to perform are due to, and a necessary outcome of, war, insurrection, terrorism, strikes or other labor disturbances, walk-outs, riots, floods, earthquakes, fires, casualties, acts of God, restrictions imposed or mandated by other governmental entities (including new or supplemental environmental regulations), enactment of conflicting State or Federal laws or regulations, or judicial decisions.

Neither party shall be deemed to be in default where delays in performance or failure to perform are due to a court order arising out of or related to litigation attacking the validity of this Agreement, the Project Approvals, the Subsequent Approvals, or any permit, ordinance, entitlement or other action of a governmental agency other than City necessary for the development of the Project. Developer shall not be deemed to be in default where delays in performance or failure to perform are t due to Developer’s inability to obtain materials, power or public facilities (such as water or sewer service) to the Project and unrelated to Developer’s actions or inactions and beyond Developer’s control. Upon the properly noticed request of either party hereto, as required by Section 12.09, an extension of time for the performance of any obligation whose performance has been so prevented or delayed will be set forth in writing. The term of any such extension shall be equal to the period of the excusable delay, or longer, as may be mutually agreed upon in writing.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
101
Section 10.05 Legal Action. Either party may, in addition to any other rights or remedies, institute legal action to cure, correct, or remedy any default, enforce any covenant or agreement herein, enjoin any threatened or attempted violation thereof, recover damages for any default, enforce by specific performance the obligations and rights of the parties hereto, or to obtain any remedies consistent with the purpose of this Agreement.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
102 Section 10.06 California Law. This Agreement shall be construed and enforced in accordance with the laws of the State of California.

Compliant
103
Section 10.07 Resolution of Disputes. With regard to any dispute involving development of the Project, the resolution of which is not provided for by this Agreement or Applicable Law, Developer shall, at City’s request, meet with City. The parties to any such meetings shall attempt in good faith to resolve any such disputes. If the parties are then unable to resolve their dispute, either party may commence mediation by providing to JAMS, or its successor, and the other party a written request for mediation, setting forth the subject of the dispute and the relief requested. The parties will cooperate with JAMS and with one another in selecting a mediator from JAMS’ panel of neutrals, and in scheduling the mediation proceedings. The parties covenant that they will participate in the mediation in good faith, and that they will share equally in its costs. All offers, promises, conduct and statements, whether oral or written, made in the course of the mediation by any of the parties, their agents, employees, experts and attorneys, and by the mediator and any JAMS employees, are confidential, privileged and inadmissible for any purpose, including impeachment, in any litigation or other proceeding involving the parties, provided that evidence that is otherwise admissible or discoverable shall not be rendered inadmissible or non-discoverable as a result of its use in the mediation. Either party may seek equitable relief prior to the mediation to preserve the status quo pending the completion of that process. Except for such an action to obtain equitable relief, neither party may commence a civil action with respect to the matters submitted to mediation until after the completion of the initial mediation session, or ninety (90) days after the date of filing the written request for mediation, whichever occurs first. Mediation may continue after the commencement of a civil action, if the parties both agree in writing. The provisions of this Section 10.07 may be enforced by any Court of competent jurisdiction, and the party seeking enforcement shall be entitled to an award of all costs, fees and expenses, including attorney’s fees, to be paid by the party against whom enforcement is ordered. Nothing in this Section 10.07 shall in any way be interpreted as requiring that Developer and City and/or City’s designee reach agreement with regard to those matters being addressed, nor shall the outcome of these meetings be binding in any way on City or Developer unless expressly agreed to in writing by the parties to such meetings.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
104
Section 10.08 Attorneys’ Fees. In any legal action or other proceeding brought by either party to enforce or interpret a provision of this Agreement, the prevailing party is entitled to reasonable attorneys’ fees and any related other costs incurred in that proceeding in addition to any other relief to which it is entitled.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
105 Section 10.09 Default by City or Developer. In the event City or Developer defaults under the terms of this Agreement, City or Developer shall have all rights and remedies provided herein and under law.

See Comments/Action Items As of December 31, 2022, there was no need to exercise the provisions of this subsection.
106
Article XI - No Agency, Joint
Venture or Partnership
107
It is specifically understood and agreed to by and between the parties hereto that unless otherwise expressly provided herein (i) the subject development is a private development; (ii) City have no interest or responsibilities for, or duty to, third parties concerning any improvements until such time, and only until such time, that City accepts the same pursuant to the provisions of this Agreement or in connection with the various Project Approvals or Subsequent Approvals; (iii) Developer shall have full power over and exclusive control of the Project herein described, subject only to the limitations and obligations of Developer under this Agreement, the Project Approvals, Subsequent Approvals, and Applicable Law; and (iv) City and Developer hereby renounce the existence of any form of agency relationship, joint venture or partnership between City and Developer and agree that nothing contained herein or in any document executed in connection herewith shall be construed as creating any such relationship between City and Developer. The City agrees that Developer’s obligations under this Agreement related to the construction of Project water, sewer and drainage infrastructure improvements, the grading and construction of traffic improvements, and the grading and construction of any other public improvements (collectively, the “Public Improvements”) are all public works of improvement the City is requiring as a condition of regulatory approval of the Project and that the Project is an otherwise private development. The City further agrees that it will contribute no more money, or the equivalent of money, to the overall Project than is required to construct the Public Improvements and that City maintain no proprietary interest in the overall Project.

Compliant
108
Article XII - Miscellaneous
109
Section 12.01 Incorporation of Recitals and Introductory Paragraph. The Recitals contained in this Agreement, and the introductory paragraph preceding the Recitals, are hereby incorporated into this Agreement as if fully set forth herein.

Not Applicable

Page 10 ends

12Exported on April 17, 2023 4:53:06 PM PDT
117
DA Section Condition/Requirement Status Comments Action Items 110
Section 12.02 Enforceability. City and Developer agree that unless this Agreement is amended or terminated pursuant to the provisions of this Agreement, this Agreement shall be enforceable by any party hereto notwithstanding any change hereafter enacted or adopted (whether by ordinance, resolution, initiative, or any other means) in any applicable general plan, specific plan, zoning ordinance, subdivision ordinance, or any other land use ordinance or building ordinance, resolution or other rule, regulation or policy adopted by City that changes, alters or amends the rules, regulations and policies applicable to the development of the Project Site at the time of the approval of this Agreement as provided by California Government Code § 65866. In the event of any conflict between the provisions of this Agreement and Applicable Law, the Project Approvals or any Subsequent Approval, this Agreement shall prevail.

Compliant
111
Section 12.03 Findings. City hereby finds and determines that execution of this Agreement furthers public health, safety and general welfare and that the provisions of this Agreement are consistent with the General Plan.

Not Applicable
112
Section 12.04 Severability. If any term or provision of this Agreement, or the application of any term or provision of this Agreement to a particular situation, is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining terms and provisions of this Agreement, or the application of this Agreement to other situations, shall continue in full force and effect unless amended or modified by mutual consent of the parties. Notwithstanding the foregoing, if any material provision of this Agreement, or the application of such provision to a particular situation, is held to be invalid, void or unenforceable, either City or Developer may (in their sole and absolute discretion) terminate this Agreement by providing written notice of such termination to the other party.

Compliant
113
Section 12.05 Other Necessary Acts. Each party shall execute and deliver to the other all such other further instruments and documents as may be reasonably necessary to carry out the Project Approvals, Subsequent Approvals and this Agreement and to provide and secure to the other party the full and complete enjoyment of its rights and privileges hereunder.

Compliant
114
Section 12.06 Each reference in this Agreement to this Agreement or any of the Project Approvals or Subsequent Approvals shall be deemed to refer to the Agreement, Project Approval or Subsequent Approval as it may be amended from time to time, whether or not the particular reference refers to such possible amendment. This Agreement has been reviewed and revised by legal counsel for both City and Developer, and no presumption or rule that ambiguities shall be construed against the drafting party shall apply to the interpretation or enforcement of this Agreement.

Not Applicable
115
Section 12.07 Other Miscellaneous Terms. The singular shall include the plural; the masculine gender shall include the feminine; “shall” is mandatory; “may” is permissive. If there is more than one signer of this Agreement, the signer obligations are joint and several.

Not Applicable
116
Section 12.08 Covenants Running with the Land. All of the provisions contained in this Agreement shall be binding upon the parties and their respective heirs, successors and assigns, representatives, lessees, and all other persons acquiring all or a portion of the Project, or any interest therein, whether by operation of law or in any manner whatsoever. All of the provisions contained in this Agreement shall be enforceable as equitable servitudes and shall constitute covenants running with the land pursuant to California law including, without limitation, California Civil Code § 1468. Each covenant herein to act or refrain from acting is for the benefit of or a burden upon the Project, as appropriate, runs with the Project Site and is binding upon the owner of all or a portion of the Project Site and each successive owner during its ownership of such property.

Not Applicable
117
Section 12.09 Notices. Any notice or communication required hereunder between City or Developer must be in writing, and may be given either personally, by fax (with original forwarded by regular U.S. Mail) by registered or certified mail (return receipt requested), or by Federal Express or other similar courier promising overnight delivery. If personally delivered, a notice shall be deemed to have been given when delivered to the party to whom it is addressed. If given by facsimile transmission, a notice or communication shall be deemed to have been given and received upon actual physical receipt of the entire document by the receiving party’s facsimile machine. Notices transmitted by facsimile after 5:00 p.m. on a normal business day or on a Saturday, Sunday or holiday shall be deemed to have been given and received on the next normal business day. If given by registered or certified mail, such notice or communication shall be deemed to have been given and received on the first to occur of (i) actual receipt by any of the addressees designated below as the party to whom notices are to be sent, or (ii) five (5) days after a registered or certified letter containing such notice, properly addressed, with postage prepaid, is deposited in the United States mail. If given by Federal Express or similar courier, a notice or communication shall be deemed to have been given and received on the date delivered as shown on a receipt issued by the courier. Any party hereto may at any time, by giving ten (10) days written notice to the other party hereto, designate any other address in substitution of the address to which such notice or communication shall be given. Such notices or communications shall be given to the parties.

Compliant
118
Section 12.10 Entire Agreement, Counterparts and Exhibits. This Agreement is executed in two (2) duplicate counterparts, each of which is deemed to be an original. This Agreement consists of 27 pages and four exhibits which constitute in full, the final and exclusive understanding and agreement of the parties and supersedes all negotiations or previous agreements of the parties with respect to all or any part of the subject matter hereof. All waivers of any provisions of this Agreement shall be in writing and signed by the appropriate authorities of City and Developer. The following exhibits are attached to this Agreement and incorporated herein for all purposes: Exhibit A - Legal Description; Exhibit A-1 - Project Site Diagram; Exhibit B - Applicable Fees; Exhibit C - Affordable Housing Agreement
Not Applicable
119
Section 12.11 Recordation of Development Agreement. Pursuant to California Government Code § 65868.5, no later than ten (10) days after City enters into this Agreement, the City Clerk shall record an executed copy of this Agreement, or Memorandum thereof, in the Official Records of the County of Contra Costa. The parties agree to cooperate as to preparation, execution, and recording of a Memorandum hereof.

Compliant
120
121
122

Page 11 ends

12Exported on April 17, 2023 4:53:06 PM PDT
118
DA Section Condition/Requirement Status Comments Action Items 123

Page 12 ends

12Exported on April 17, 2023 4:53:06 PM PDT
119
Resolution No. 23- 1 May 1, 2023

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Periodic Review of Trans Bay Cable )
Development Agreement Between The )
City of Pittsburg and Trans Bay Cable ) R ESOLUTION NO. 23- LLC and Determination as to )
With Development Agreement )

The Pittsburg City Council DOES RESOLVE as follows:

WHEREAS, a Development Agreement between the City of Pittsburg and Trans Bay Cable, LLC, was executed on November 27, 2006, for the Trans Bay Cable Project; and

WHEREAS, a 1st Amendment to the Development Agreement was executed on August 31, 2007; and

WHEREAS, a 2nd Amendment to the Development Agreement was executed on November 15, 2010; and

WHEREAS, California Government Code Section 65864 et seq. (“Development Agreement Statutes” ) authorizes and regulates the execution of development agreements (“DAs") between certain pu blic entities and persons who desire to develop private property within a public entity’s jurisdiction; and

WHEREAS, pursuant to the Development Agreement Statut es, the City established procedures for the consideration of DA applications by property own ers or other persons having an interest in property within City’s jurisdiction; and

WHEREAS, Section 65865.1 requires City to conduct a periodic review of the City’s active Development Agreements, at which time each respective developer is required to demonstrate good faith compliance with the terms of the Development Agreement (“Periodic Review”); and

WHEREAS, if, as a result of the Periodic Review, the City finds and determines, on the basis of substantial evidence, that a developer has not complied in good faith with the terms and conditions of the Development Agreement, the City may terminate or modify the DA pursuant to the Development Agreement Statutes; and

WHEREAS, t he last periodic review of t he Trans Bay Cable D evelopment Agreement was conducted , and on December 21 , 20 20, the City Council d etermined that the developer was in compliance with the terms of the Development Agreement.

NOW, THEREFORE, the City Council finds and determines as follows:
120
Resolution No. 23- 2 May 1, 2023

Section 1. Findings

The City Council hereby finds and determines that the above recitals are true and correct and have served as the basis, in part, for the findings and actions of the City Council set forth below.

Section 2. Compliance with Development Agreement

The City Council hereby finds and determines that , based on the information provided by the Developer and City Staff, as well as the information contained in the "Trans Bay Cable D A – 2022 Annual Review", attached hereto and incor porated herein by reference as "Exhibit 1,” the Developer has demonstrated good faith compliance with the Trans Bay Cable Development Agreement.

Section 3. Certificate of Compliance

The City Council hereby d irects a nd authorizes the City Manager to issue a certificate codifying the "Finding of Compliance" for Trans Bay Cable Development Agreement in a form that can be recorded by the Developer.

Section 4. Certification

The City Clerk shall certify the adoption of this Resolution.

Section 5. Effective Date

This Resolution shall take effect immediately upon adoption.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a r egular meeting on the 1st day of May, 2023, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:
____________________________
Shanelle Scales-Preston, Mayor

ATTEST:
______________________________
Alice E. Evenson, City Clerk

121
Exhibit 1 - Trans Bay Cable DA - 2022 Annual Review Summary Table DA Section Condition/Requirement Status Comments
1 Section 1 - General
Acknowledgements
2 The parties acknowledge that: (a) the City has entered into this Agreement pursuant to the Development Agreement Statutes and its police power in order to address public health and safety and general welfare concerns including those relating to the amount, density, intensity and timing of development on the Project Site and the need for public facilities and infrastructure in connection with the Project Site and other property in the area; (b) there is a certain authority under the police power to address public health and safety concerns that cannot be legally relinquished or restricted by this Agreement and that such authority intended to be reserved and hereby is reserved to City hereunder; and (c) nothing herein shall be construed to limit or restrict the exercise by the City of its power of eminent domain.

Not Applicable
3 Section 2 - General Provisions
4 2.01 Property Description. The legal description of the Project Site is specifically set forth on Exhibit A, attached hereto and made a part hereof.

Not Applicable
5 2.02 Location of Project Site. The Project Site is located in the City and consists of a total of approximately

7.72 acres.

Not Applicable
6 2.03 Effective Date. This Agreement shall be binding as to TBC upon TBC's execution hereof, with an effective date ("Effective Date") as of the effective date of the ordinance adopting the Agreement.

See Comments/Action
Items
Ordinance No. 06-1278 approving the DA was
adopted on November 27, 2006. 1st Amendment
allowing a reduction in the size of the converter
station and use of HVDC Plus Technology was
entered into on August 21, 2007. 2nd
Amendment extending the term of the DA to
November 27, 2036 was entered into on
November 15, 2010.
7 2.04 Term. The term of this Agreement shall commence upon the Effective Date and shall extend thirty (30) years thereafter, unless the term is otherwise terminated, modified or extended by circumstances set forth in this Agreement or by mutual, written consent of the parties.

Not Applicable This text is from the 2nd Amendment to the DA 8 2.05 Expiration of Term. Following the expiration of the term, this Agreement shall be deemed terminated and of no further force and effect.

Not Applicable
9 2.06 Time is of the Essence. Time is of the essence of this Agreement and of each and every term and condition hereof.

Not Applicable
10 2.07 Enforceability of Agreement. City and TBC agree that unless this Agreement is amended or terminated pursuant to the provisions of this Agreement, this Agreement shall be enforceable by any party hereto notwithstanding any change hereafter in any applicable general plan, specific plan, zoning ordinance, subdivision ordinance, the Existing Rules or any other land use ordinances or building ordinances, resolutions or ordinances or other regulations adopted by the City which changes, alters or amends the Existing Rules applicable to the development of the Project Site at the time of the approval of this Agreement as provided by Government Code Sections 65866 and 65867.5. This Agreement shall not prevent City from denying or conditionally approving any subsequent development project application by a third party not a successor-in-interest hereto on the basis of such existing or new rules, regulations and policies.

Not Applicable
11 2.08 Further Assurances. Each party shall execute and deliver to the other all such other further instruments and documents as may be reasonably necessary to carry out this Agreement in order to provide and secure to the other party the full and complete enjoyment of its rights and privileges hereunder.

Not Applicable
12 2.09 Enforcement of Covenants. All of the provisions of this Agreement shall be enforceable as equitable servitudes and constitute covenants running with the land pursuant to applicable law, including but not limited to, Section 1468 of the Civil Code of the State of California.

Not Applicable
13 2.10 Covenants Run With The Land. Except as otherwise specified herein, all of the terms, provisions, covenants and obligations contained in this Agreement shall be binding upon the parties and their respective heirs, successors, and assigns, and all other persons or entities acquiring all or any portion of the Project Site, or any interest therein, whether by operation of law or in any manner whatsoever, and the rights thereof shall inure to the benefit of such parties and their respective heirs, successors and assigns.

Not Applicable
14 2.11 Constructive Notice. Every person who now or hereafter owns or acquires any right, title or interest in or to any portion of the Project or the Project Site is and shall be conclusively deemed to have consented and agreed to every provision contained herein, whether or not any reference to this Agreement is contained in the instrument by which such person acquired an interest in the Project or the Project Site.

Not Applicable
15 Section 3 - Definitions
16 Reference in this Agreement to any of the following terms shall have the meaning set forth below for each such term.

Not Applicable
17 3.01 Approvals. Any and all permits or approvals of any kind or character required under the terms of this Agreement to develop the Project Site in the manner as described herein.

Not Applicable
18 3.02 Building Ordinances. Those building standards, of general application and not imposed solely with respect to the Project Site, in effect from time to time that govern building and construction standards, including, without limitation, the City's building, plumbing, electrical, mechanical, grading, swimming, pool, sign, and fire codes.

Not Applicable
19 3.03 CEQA. CEQA means the California Environmental Quality Act, California Public Resources Code section 21000, et seq., and the State CEQA Guidelines, (California Code of Regulations, title 14, section 15000, et seq.), as each is amended from time to time.

Not Applicable

Page 1 ends

8Exported on April 17, 2023 4:39:24 PM PDT
122
DA Section Condition/Requirement Status Comments
20 3.04 City. City of Pittsburg, County of Contra Costa, State of California. Not Applicable 21 3.05 Comprehensive Payment In Lieu of Fees. The comprehensive payment in lieu of fees ("CPIF") means a payment to City or PPC that represents the liquidated value of all application, processing and development impact fees and other monetary exactions on development of any form or description that exist as of August 2, 2004, or could thereafter be adopted or increased, as established by City, PPC, or any City entity, and which further represents payment in lieu of any other compensation of any kind or description to which City, Agency, PPC or any City entity could claim or be entitled to for having facilitated the Project as it exists as of November 15, 2010, and as described in this Agreement. The parties expressly acknowledge that, by virtue of the adoption of this Agreement, City is waiving any constitutional or statutory authority that may now exist or hereafter be established to levy and assess any application, processing or development impact fee as to the Project, or any general or special tax that is not generally applicable to all commercial property situated within the City, an is accepting the CPIF as full compensation and satisfaction thereof. The CPIF does not include and is not intended to replace (a) generally assessed property taxes, (b) generally assessed sales and use taxes, (c) generally assessed franchise fees, (d) lease payments to PPC for the real property located at 590 West Tenth Street, Pittsburg, (e) any fees, assessments, taxes or other levies of any type or nature which the City may validly impose on new applications for Project approvals submitted by TBC after November 15, 2010, or (f) any financial benefit to City, Agency or PPC from the Project received on or before the effective date of the Second Amendment hereto, or received thereafter under the Settlement Agreement.

Not Applicable This text is from the 2nd Amendment to the DA 22 3.06 Development. The improvement of the Project Site for purposes of constructing the structures, improvements and facilities comprising the Project including, without limitation: grading, the construction and installation of infrastructure and public facilities related to the Project whether located within or outside the Project Site; the construction of structures and building; and the installation of landscaping; but not including the maintenance, repair, reconstruction or redevelopment of any structures, improvements or facilities after the construction and completion thereof.

Not Applicable
23 3.07 Development Agreement Statutes. Sections 65864 through 65869.5 of the California Government Code as it exists on the Effective Date.

Not Applicable
24 3.08 Development Approval(s). Site-specific permits and other entitlements to use of every kind and nature approved or granted by the City in connection with the Development.

Not Applicable
25 3.09 Enacting Ordinance. Ordinance No. 06-1278 enacted by the City Council on November 27, 2006, approving this Agreement.

Not Applicable
26 3.10 Existing Land Use Ordinances. The Land Use Ordinances in effect as of the Effective Date of this Agreement.

Not Applicable
27 3.12 General Plan. The City of Pittsburg General Plan as adopted by the City Council. Not Applicable 28 3.13 Land Use Ordinances. The ordinances, resolutions, codes, rules, regulations and official policies of City, governing the development of the Project Site, including but not limited to, the permitted uses of land, the density and intensity of use of land, exactions, and the timing of development, all as applicable to the development of the Project Site. Specifically, but without limiting the generality of the foregoing, Land Use Ordinances shall include the City's General Plan, the Development Plan, the City's Zoning Code, and the City's Design Review standards. The term Land Use Ordinances does not include Regulations relating to the following: the conduct of business, professions and occupations generally; taxes and assessments; the control and abatement of nuisances; encroachment and other permits and the conveyances of rights and interests that provide for the use of or entry upon public property; and any exercise of the power of eminent domain.

Not Applicable
29 3.14 Manager. City Manager for the City of Pittsburg. Not Applicable 30 3.15 Persons. As used herein, any reference to or use of the word "person" shall mean, in addition to a natural person, any governmental entity and any partnership, corporation, joint venture or any other form of business entity.

Not Applicable
31 3.16 Project. The Trans Bay Cable Project ("Project") shall consist of a converter station located in Pittsburg, California, a converter station located in San Francisco, California, and a submerged cable connecting the two converter stations as more particularly described in Exhibit B.

Not Applicable
32 3.17 Project Site. That real property described in Exhibit A, attached hereto and incorporated herein. Not Applicable 33 3.18 Regulations. Constitutions, statutes, City ordinances, and codes, City resolutions and official policies of the City.

Not Applicable
34 3.19 Certain Other Terms. Certain other terms shall have the meanings set forth for such terms in this Agreement.

Not Applicable
35 Section 4 - General Development
of the Property
36 4.01 Project. The Project is further defined and described in the Project Description, attached hereto as Exhibit B, which specifies several Project requirements, including but not limited to: (i) proposed uses of the Project Site, (ii) height, size and location of buildings to be constructed on the Project Site, (iii) density and intensity of use of the property, and (iv) requirements for reservation or dedication of portions of the Project Site for public purposes. The Parties recognize that any changes or modifications to the Project, as set forth in the Project Description, may trigger legal requirements mandating City review and/or approval relating to, but not limited to, environmental, design, mitigation measures, building standards, or similar factors. Prior to implementing such changes or modifications that trigger such legal requirements, TBC shall timely seek and obtain City review and approval.

Compliant
37 4.02 General Development. Any development of the Project on the Project Site shall be conducted in accordance with the terms and conditions of this Agreement, the Project Agreements and the Project Description. TBC's development of the Project Site, including the converter station, shall be subject to City's building standards, Design Review process, and applicable rules and regulations.

Compliant

Page 2 ends

8Exported on April 17, 2023 4:39:24 PM PDT
123
DA Section Condition/Requirement Status Comments
38 4.03 Permitted Uses. The permitted uses of the Project Site, the density and intensity of use, the maximum height and size of proposed buildings, provisions for reservation or dedication of land for public purposes and location of public improvements, and other terms and conditions of development applicable to the Project Site shall include a transformer, a converter station, and related facilities, subject to the following:
(a) Final Environmental Impact Report ("FEIR"), and related Mitigation Monitoring Plan, (b) A landscaping buffer between Tenth Street and the actual facility, and (c) Such other uses permitted by this Agreement, insofar as this Agreement so provides or as otherwise set forth in applicable laws, ordinances, rules or regulations.

Compliant
39 4.04 Future Approvals. The City hereby agrees that land uses sought by TBC for the Project Site are approved or will be approved pursuant to the terms of this Agreement, provided that TBC satisfactorily complies with all preliminary procedures, actions, payments and criteria applicable as of the effective date of this Agreement and generally required of Developers by the City for processing applications for developments at such time. City agrees to grant and implement the necessary land use, zoning, or site plan approvals and to grant other approvals and permits, including the Ministerial Approvals, that will accomplish or facilitate development of the Project Site for the uses and to the density or intensity of development described and shown in this Agreement pursuant to those rules, regulation policies and conditions in force on the effective date of this Agreement. Future approvals may relate to design review, parcel map(s), and building permits.

Compliant
40 4.05 Vested Right to Develop; Applicable Rules, Regulations and Official Policies. Except as otherwise provided in this Agreement, the rules, regulations, official policies, and conditions of approval governing the permitted uses of the Project Site, the density or intensity of use, and the design, improvement, construction, building and occupancy standards and specifications applicable to the Project and the Project Site shall be those in force on the effective date of this Agreement ("Existing Rules"). The City shall have the right to impose reasonable conditions in connection with such subsequent discretionary permit actions which are not deemed Ministerial Approvals, but such conditions and actions shall not prevent development of the Project as contemplated,by this Agreement and the Development Permits.

TBC shall have the right to build and implement the Project on the Project Site consistent with the terms of this and other applicable Agreements, rules and regulations.

Compliant
41 4.06 Amendment to Applicable Ordinances. In the event the City Zoning Code is amended by the City in a manner which provides more favorable site development standards than those in effect as of the Effective Date, TBC shall have the right to notify City in writing of TBC's desire to be subject to the new standards for the remaining term of this Agreement. If City agrees, by resolution of the City Council or by action of a City official whom the City Council may designate, such new standards shall become applicable to the Project Site.

Not Applicable
42 4.07 Application of New Rules, Regulations and Policies. This Agreement shall not prevent City in subsequent actions applicable to the Project Site from applying new rules, regulations and policies which do not conflict with those rules, regulations, and policies applicable to the Project Site and set forth herein; nor shall this Agreement prevent City from denying or conditionally approving any subsequent development application on the basis of such existing or new rules, regulations, and policies.

Not Applicable
43 4.08 Changes in State and Federal Rules and Regulations. Nothing in this Agreement shall preclude the application to the development of the Project Site or changes in the City's laws, regulations, plans or policies, the terms of which are specifically mandated and required by changes in state or federal laws or regulations as provided in Government Code Section 65869.5.

Not Applicable
44 Section 5 - Periodic Review
45 City shall conduct a review of this Agreement as set forth in the following subsections. However, the City's failure to timely conduct such review shall not constitute default under this Agreement. 46 5.01 Annual Review. City shall review the extent of good faith compliance by TBC with the terms of this Agreement at least once every 12-month period from the Effective Date of this Agreement.

Compliant
47 5.02 Procedure. Such annual review shall be conducted in accordance with the City's duly adopted Development Agreement Procedures.

Compliant
48 5.03 Notice. City shall notify TBC in writing of the date of review at least thirty (30) days prior thereto. Compliant Notice of the Annual Review was given to the Developer on April 21, 2022.
49 5.04 Good-faith Compliance. During each annual review, TBC is required to demonstrate good faith compliance with the terms of this Agreement.

Not Applicable
50 5.05 Production of Documents and Other Evidence. TBC agrees to furnish such reasonable evidence and adequate documentation of good faith compliance as the City, in the exercise of its reasonable discretion, may require.

Not Applicable
51 5.06 Cost of Annual Review. The costs incurred by City in connection with the annual review shall be borne by TBC, up to a maximum of $10,000 per review. Upon written request by the City, TBC shall deposit with the City up to $10,000 per review to cover the City's costs. At the completion of the review, City shall refund any unused deposit to TBC. Failure, if any, by TBC to deposit the monies shall be grounds for declaring TBC to be in default of this Agreement and/or in noncompliance thereof, and for the City to take such action as provided herein.

In Progress On December 21, 2022, the City sent a request to the developer to pay the cost of the annual
review.
52 Section 6 - Obligations of TBC
53 6.01 General Obligations. In consideration of City entering into this Agreement, TBC has agreed to comply with the applicable provisions of the PDA and Project Description in developing the Project and to perform certain obligations and provide certain contributions set forth therein, which City acknowledges will have an overall benefit to the public and surrounding area.

Compliant
54 6.02 Nexus/Reasonable Relationship Challenges. TBC consents to, and waives any rights it may have now or in the future to challenge the legal validity of, the conditions, requirements, policies or programs required by the Existing Land Use Ordinances, Existing Rules or this Agreement including, without limitation, any claim that they constitute an abuse of the police power, violate substantive due process, deny equal protection of the laws, effect a taking of property without payment of just compensation, or impose an unlawful tax.

Not Applicable

Page 3 ends

8Exported on April 17, 2023 4:39:24 PM PDT
124
DA Section Condition/Requirement Status Comments
55 6.03 Cooperation By TBC. TBC will, in a timely manner, provide City with all documents, applications, plans and other information necessary for City to carry out its obligations hereunder, and cause TBC's planners, engineers, and all other consultants to submit in a timely manner all required materials and documents therefore.

Compliant
56 6.04 Other Governmental Permits. TBC shall apply in a timely manner for such other permits and approvals from other governmental or quasi-governmental agencies having jurisdiction over the Project Site as may be required for the development of, or provision of services to, the Project.

Compliant
57 6.05 Fees and Taxes This section (6.05) of the DA was deleted as a result of the 2nd Amendment to the DA
65 6.06 Mitigation and Monitoring Plan. TBC shall fully comply with the Mitigation and Monitoring Plan, adopted by the City Council on November 6, 2006.

Compliant
66 6.07 Continuing Obligations. Notwithstanding any other provision of this Agreement, TBC's obligations under Section 6.05.1- 6.05.3, inclusive, shall constitute a continuing obligation and bind TBC, its successors and/or assigns, but shall not transfer to the City, PPC, or the City's and/or PPC's successors and assigns, upon TBC's transfer of its interest(s) in the Project Site and/or Project Assets to the City and/or TBC.

TBC's obligations under Section 6 shall survive this Agreement's termination.

Not Applicable This section (6.07) of the DA was deleted as a result of the 2nd Amendment to the DA
67 Section 7 - Obligations of City
68 In consideration of TBC entering into this Agreement, City has agreed to the following with respect to the development of the Project Site:
69 7.01 Processing. Upon satisfactory completion by TBC of all required preliminary actions to the satisfaction of City, City shall promptly commence and diligently proceed to complete all required steps necessary for the implementation of this Agreement and the development by TBC of the Project Site in accordance with the provisions of this Agreement including, but not limited to, the following: (a) the holding of all required public hearings; and (b) the processing and approval of all Ministerial Approvals and related matters as necessary for the completion of the development of the Project. In this regard, TBC will, in a timely manner, provide City with all documents, applications, plans and other information necessary for City to carry out its obligations hereunder as required by the Existing Rules and shall cause TBC's planners, engineers and all other consultants to submit in a timely manner all required materials and documents therefore as required by the Existing Rules.

Compliant
70 7.02 Standard of Review. The rules, regulations and policies that apply to any Ministerial Approvals which must be secured prior to the construction of any portion of the Project shall be the Existing Rules. Any Ministerial Approval, including without limitation a building permit, shall be approved by the City within a reasonable period of time after application is made therefore.

Compliant
71 Section 8 - Amendments
72 8.01 Major Amendments. A "Major Amendment" shall be any modification that makes a substantive change, modification or deviation in the terms of this Agreement or any Exhibits or Schedules attached hereto including the terms of the Project Description attached hereto as Exhibit B and related maps and attachments, as referenced in Recital F. Approval of any Major Amendment shall require a noticed hearing and must be authorized by formal action of the Planning Commission and the City Council.

Compliant
73 8.02 Minor Amendments. A "Minor Amendment" shall be any modification that does not make a substantive change, modification or deviation in the terms of this Agreement or any Exhibits or Schedules attached hereto, including the terms of the Project Description attached hereto as Exhibit B and related maps and attachments, as referenced in Recital F. Minor Amendments shall include, but are not limited to, the size of the proposed converter station. Minor Amendments may be approved by the prior written consent of the Manager.

Compliant
74 8.03 Discretion of Manager. The Manager has the sole discretion to determine whether any proposed change, modification, or deviation is a Major Amendment or Minor Amendment for purposes of this Agreement, or is neither and thus not requiring the Manager's or the City Council's review and approval. The Manager's determination as to the status of any Major or Minor Amendment is final. The Manager also may, at his/her discretion, determine that a Minor Amendment shall be reviewed and acted upon by the City Council and not by the Manager.

Compliant
75 Section 9 - Transfers and
Assignments
76 9.01 City's Intent. TBC has demonstrated, and the City finds that TBC possesses, the experience, reputation and financial resources to develop and maintain the Project Site in the manner contemplated by this Agreement. It is because of such qualifications, which assure the development of the Project Site to a high quality standard contemplated by the General Plan that the City is entering into this Agreement.

Accordingly, restrictions on the right of TBC to assign or transfer the rights and privileges contained in this Agreement are necessary in order to assure the achievement of the objectives of the City's General Plan and this Agreement.

Not Applicable
77 9.02 TBC's Right to Assign or Transfer. TBC may assign or transfer any of its rights or interests under this Agreement subject to the prior written consent of City, which shall not be unreasonably withheld.

Not Applicable
78 9.03 Restriction on Assignment Does Not Constitute an Unreasonable Restraint on Alienation. TBC agrees that the restriction on its right to transfer any of its rights or interests under this Agreement is not repugnant or unreasonable in that such a restriction is a material inducement to the City to enter into this Agreement since the restriction reserves for the City the power to prevent the transfer of any of the rights and obligations hereunder to an unreliable third party.

Not Applicable
79 9.04 Restriction on Assignment Shall Not Prevent TBC From Conveying the Project Site. The parties agree that the restriction on assignment is limited solely to those certain vested rights created under this Agreement and such restriction shall not affect TBC's right to convey the Project Site itself.

Not Applicable
80 9.05 Request Procedure. City shall administer the provisions of this Section through its City Manager. TBC shall notify the Manager in writing of its request for City's consent to an assignment or transfer under this Section.

Not Applicable

Page 4 ends

8Exported on April 17, 2023 4:39:24 PM PDT
125
DA Section Condition/Requirement Status Comments
81 9.06 Additional Information. Upon receipt of a request for an assignment or transfer under this Section, the City Manager shall have the authority to require the production of additional information relating to the qualifications of the proposed assignee or transferee from TBC. TBC shall promptly furnish any and all information required under this Section as the City considers TBC's request for consent to the proposed assignment or transfer.

Not Applicable
82 9.07 Approval of Assignment. The City Manager may, at his or her reasonable discretion, approve of the assignment or transfer in writing, deny the assignment or transfer, or refer the matter to the City Council for approval. In the event the City Manager determines that the assignment or transfer should be acted upon by the City Council, the City Manager shall notify TBC in writing of the need for City Council authorization. The City Council shall thereafter consider the proposed assignment or transfer. The proposed assignment or transfer may be approved or denied by formal action of the City Council.

Not Applicable
83 9.08 Notice of Proposed Assignment. TBC must provide City with adequate evidence that the proposed assignee, buyer or transferee is qualified using the standards and conditions described in this Section, and ability to comply with these standards and conditions will be the test of reasonableness.

Not Applicable
84 9.09 Conditions and Standards. The conditions and standards referred to above are as follows:
85 (a) Such assignee or transferee possesses the experience, reputation and financial resources to cause the Project Site to be developed and maintained in the manner contemplated by the City's General Plan and this Agreement;
Not Applicable
86 (b) Such assignee or transferee enters into a written assumption agreement, in form and content satisfactory to the City Attorney, expressly assuming and agreeing to be bound by the provisions of this Agreement; Not Applicable
87 (c) Such assignment or transfer will not impair the ability of City to achieve the objectives of its general Plan and this Agreement;
Not Applicable
88 9.10 Financing Exemption. Mortgages, deeds of trust, sales and lease­ backs, or other forms of conveyance required for any reasonable method of financing requiring a security arrangement with respect to the Project Site are permitted without the consent of the City, provided the City receives prior notice of such financing (including the name and address of the lender and the person or entities acquiring any such secured interest) and TBC retains over fifty percent of the legal or equitable interest in the Project Site and remains fully responsible hereunder. The words "mortgage" and "deed of trust," as used herein, include all other appropriate modes of financing real estate acquisition, construction and land development.

Not Applicable
89 9.11 Notice of Assignment. Upon receiving approval of an assignment, TBC shall provide City with written notice of such assignment and as part of such notice the assignee must execute and deliver to City an assumption agreement in which the name and address of the assignee is set forth and the assignee expressly and unconditionally assumes the obligations of all the provisions set forth in the Agreement.

Not Applicable
90 9.12 Unapproved Assignments. If City makes the determination not to consent to the assignment or transfer of the rights and privileges contained in this Agreement, and TBC conveys the Project Site to a third party, in whole or in part, TBC shall remain liable and responsible for all of the duties and obligations of this Agreement. Notwithstanding any other provision of this Agreement, TBC may assign this Agreement to PPC without City's prior consent in connection with PPC's acquisition of the Project Assets.

Not Applicable
91 Section 10 - Delays in
Performance
92 10.01 Permitted Delays. In addition to any other provisions of this Agreement with respect to delay, TBC and City shall be excused for performance of their obligations hereunder during any period of delay caused by acts of God or civil commotion, riots, strikes, picketing, or other labor disputes, shortage of materials or supplies, or damage to or prevention of work in process by reason of fire, floods, earthquake, or other casualties, litigation, acts or neglect of the other party, or restrictions imposed or mandated by governmental or quasi-governmental entities, enactment of conflicting provisions of the Constitution or laws of the United States of America or the State of California or any codes, statutes, regulations or executive mandates promulgated thereunder.

Not Applicable
93 10.02 Third Party Actions. Any court action or proceeding brought by any third party to challenge this Agreement, or any other permit or approval required from City or any other governmental entity for development or construction of all or any portion of the Project, whether or not TBC is a party to or real party in interest in such action or proceeding, shall constitute a Permitted Delay under this Section.

Not Applicable
94 10.03 Notice of Permitted Delays. If written notice of such delay is given to either party within (30) days of the commencement of such delay, an extension of time for such cause shall be granted in writing for the period of the enforced delay, or longer as may be mutually agreed upon.

Not Applicable
95 Section 11 - Default
96 11.01 Events of Default. Subject to any extensions of time by mutual consent in writing, and subject to the provisions of the Section regarding Permitted Delays, the failure or unreasonable delay by either party to perform any material term or provision of this Agreement for a period of thirty (30) days after the dispatch of a written notice of default from the other party shall constitute a default under this Agreement. If the nature of the alleged default is such that it cannot reasonably be cured within such 30- day period, the commencement of the cure within such time period and the diligent prosecution to completion of the cure shall be deemed a cure within such period. The nonperformance of a material provision of the Mitigation Monitoring Program shall constitute an event of default under this Agreement; provided, however, that the City shall have given TBC notice of such event and a prospective opportunity to cure, within the cure period described herein. The nonperformance of a provision of the Mitigation Monitoring Program that would not otherwise be considered material, as reasonably determined by the City, may become material if such provision is consistently repeated or ignored after several requests to address such matter from the City or representative thereof.

Not Applicable
97 11.02 Notice of Default. Any Notice of Default given hereunder shall specify in detail the nature of the alleged Event of Default and the manner in which such Event of Default may be satisfactorily cured in accordance with the terms and conditions of this Agreement.

Not Applicable

Page 5 ends

8Exported on April 17, 2023 4:39:24 PM PDT
126
DA Section Condition/Requirement Status Comments
98 11.03 Cure Period. During the time periods herein specified for cure of an Event of Default, the party charged therewith shall not be considered to be in default for purposes of termination of this Agreement, institution of legal proceedings with respect thereto, or issuance of any building permit with respect to the Project.

Not Applicable
99 11.04 General Default Remedies. After notice and expiration of the 30-day period without cure, the non- defaulting party shall have such rights and remedies against the defaulting party as it may have at law or in equity, including, but not limited to, the right to terminate this Agreement pursuant to Government Code Section 65868 or seek mandamus, specific performance, injunctive or declaratory relief.

Not Applicable
100

11.05 Remedies Cumulative. Any rights or remedies available to non­ defaulting party under this Agreement and any other rights or remedies that such party may have at law or in equity upon a default by the other party under this Agreement shall be distinct, separate and cumulative rights and remedies available to such non­ defaulting party and none of such rights or remedies, whether or not exercised by the non- defaulting party, shall be deemed to exclude any other rights or remedies available to the non-defaulting party. The non-defaulting party may, in its discretion, exercise any and all of its rights and remedies, at once or in succession, at such time or times as the non-defaulting party considers appropriate.

Not Applicable
101

11.06 Legal Action. Either party may, in addition to any other rights or remedies, institute legal action to cure, correct or remedy a default, enforce any covenant or agreement herein, enjoin any threatened or attempted violation hereof, or enforce by specific performance the obligations and rights of the parties hereto.

Not Applicable
102

11.07 No Damages Relief Against City. The parties acknowledge that City would not have entered into this Agreement had it been exposed to damage claims from TBC for any breach thereof. As such, the parties agree that in no event shall TBC be entitled to recover damages against City for breach of this Agreement. However, should a court issue a final judgment or other final determination that the City has adopted a tax or assessment, or increase thereof, in violation of Section 4.08 and TBC has paid such tax or assessment, or increase thereof, TBC shall be entitled a refund of such monies it has paid.

Additionally, during the period of time that TBC is a party to this Agreement, should the City voluntarily change the zoning on the Project Site, such that the Project may no longer be built on the Project Site, then the limitation under this section shall not apply to the extent of monies actually received by the City and paid by TBC.

Not Applicable
103

11.08 Effect of TBC Default. No building permit shall be issued or building permit application accepted for any structure on the Project Site after TBC is determined by City to be in default of the terms and conditions of this Agreement, and until such default thereafter is cured by the TBC or is waived by City.

Not Applicable
104

11.09 Waiver. All waivers must be in writing to be effective or binding upon the waiving party, and no waiver shall be implied from any omission by a party to take any action with respect to such Event of Default.

Failure by a party to insist upon the strict performance of any of the provisions of this Agreement by the other party shall not constitute waiver of such party's right to demand strict compliance by such other party in the future.

Not Applicable
105 11.10 Scope of Waiver. No express written waiver of any Event of Default shall affect any other Event of Default, or cover any other period of time specified in such express waiver.

Not Applicable
106

11.11 Attorneys' Fees. Should legal action be brought by either party for breach of this Agreement or to enforce any provision herein, the prevailing party in such action shall be entitled to reasonable attorneys' fees, court costs and such other costs as may be fixed by the court.

Not Applicable
107

11.12 Venue. In the event that suit shall be brought by either party to this contract, the parties agree that venue shall be exclusively vested in the State courts of the County of Contra Costa or where appropriate, or in the United States District Court for the Northern District of California, as consistent with applicable law.

Not Applicable
108
Section 12 - Termination
109 12.1 Effect of Termination. Upon termination of this Agreement, the rights, duties and obligations of the parties hereunder shall, subject to the following provisions, cease as of the date of such termination.

Not Applicable
110 12.2 Termination by City. If City terminates this Agreement because of TBC's default, then City shall retain any and all benefits, including money or land received by City hereunder.

Not Applicable
111

12.3 Termination by TBC. TBC shall have the right to terminate this Agreement at any time, prior to Commercial Operation, as defined in the PSA. Should TBC terminate this Agreement, prior to Commercial Operation, TBC agrees, at TBC's sole cost, to restore the Project Site to its condition prior to TBC asserting control over the Project Site or in such condition as may otherwise by approved in writing by the Manager. Such restoration shall be consistent with applicable federal, state, and local statutes, rules and regulations and shall also comply with the following: Promptly following the demolition and removal of structures, foundations and paving on the Project Site, and the cleaning, grubbing, and grading thereof. TBC shall create, at its sole expense, a visual record of the then-condition of the Project Site, in coordination with the City, which record shall include comprehensive photographic and videographic documentation ("the Record"). Both parties shall have copies of the Record. If TBC commences construction activities, but terminates the Agreement before the Project achieves Commercial Operation, TBC shall restore at its sole expense the Project Site to a rough graded and clean condition, with all aboveground structures, foundations and paving on the Project Site demolished and removed so that the Project Site is in substantially similar condition to that depicted in the Record, or in such condition as may be mutually agreed to in writing between TBC and the Manager.

Not Applicable
112
Section 13 - Relationship of
Parties
113 13.01 Independent Contractors. The parties agree that the Project is a private development and that neither party is acting as the agent of the other in any respect hereunder.

Not Applicable
114

13.02 No Joint Venture or Partnership. City and TBC hereby renounce the existence of any form of joint venture or partnership between them, and agree that nothing contained herein or in any document executed in connection herewith shall be construed as making City and TBC joint venturers or partners.

Not Applicable
115

13.03 No Third Party Beneficiaries. The only parties to this Agreement are TBC and City. There are no third party beneficiaries and this Agreement is not intended, and shall not be construed, to benefit, or be enforceable by any other person whatsoever.

Not Applicable

Page 6 ends

8Exported on April 17, 2023 4:39:24 PM PDT
127
DA Section Condition/Requirement Status Comments
116

13.04 Ambiguities or Uncertainties. The parties hereto have mutually negotiated the terms and conditions of this Development Agreement and this has resulted in a product of the joint drafting efforts of both parties.

Neither party is solely or independently responsible for the preparation or form of this agreement.

Therefore, any ambiguities or uncertainties are not to be construed against or in favor of either party.

Not Applicable
117
Section 14 - Applicable Law
118 This Agreement shall be construed and enforced in accordance with the laws of the State of California. Not Applicable 119
Section 15 - Supersedure of
Subsequent Laws of Judicial Action
120
The provisions of this Agreement shall, to the extent feasible, be modified or suspended as may be necessary to comply with any new law or decision issued by a court of competent jurisdiction, enacted or made after the effective date which prevents or precludes compliance with one or more provisions of this Agreement. Immediately after enactment of any such new law, or issuance of such decision, the parties shall meet and confer in good faith to determine the feasibility of any such modification or suspension based on the effect such modification or suspension would have on the purposes and intent of this Agreement.

Not Applicable
121
Section 16 - Cooperation in the
Event of Legal Challenge
122
In the event of any legal or equitable action or other proceeding instituted by any third party (including a governmental entity or official) challenging the validity of any provision of this Agreement, the parties hereby agree to cooperate in defending such action or proceeding.

Not Applicable
123
Section 17 - Hold Harmless
Agreement
124
TBC hereby agrees to, and shall defend, save and hold City and its elected and appointed boards, commissions, officers, agents, and employees harmless from, any and all claims, costs and liability for any damages, personal injury or death, which may arise, directly or indirectly, from TBC's or TBC's contractors', subcontractors', agents or employees' operations under this Agreement, whether such negligent operations be by TBC or by any of TBC's contractors, subcontractors, agents or employees.

Not Applicable
125
Section 18 - Indemnification
126
A. TBC agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents and consultants from any and all administrative, legal or equitable actions or other proceedings instituted by any person not a party to this Agreement challenging the validity of the Agreement or any action arising out of or stemming from this Agreement. TBC may select its own legal counsel to represent TBC's interests at TBC's sole cost and expense. The parties shall cooperate in defending such action or proceeding. TBC shall pay for City's costs of defense, whether directly or by timely reimbursement on a monthly basis. Such costs shall include, but not be limited to, all court costs and attorney's fees expended by City in defense of any such action or other proceeding, plus staff and attorney time spent in regard to defense of the action or proceeding. The parties shall use best efforts to select mutually agreeable defense counsel but, if the parties cannot reach agreement, City may select its own legal counsel and Developer agrees to pay directly or timely reimburse on a monthly basis City for all such court costs, attorney fees and time referenced herein.

Compliant
127
B. TBC also agrees to indemnify, defend and hold harmless the City, its officials, officers, employees, agents and consultants from any claims, costs, damages, or other liabilities for any personal injury or death, or property damage, resulting from the construction of the Project or of operations of TBC, its officers, employees, agents or consultants, under this Agreement, except for such claims, costs, damages, or other liabilities which are caused by the sole or gross negligence of the City, its officials, officers, employees, agents, or consultants. TBC may select its own legal counsel to represent TBC's interests at TBC's sole cost and expense.

Compliant
128
C. The parties agree that this Section 18 shall constitute a separate agreement entered into concurrently, and that if any other provision of this Agreement, or the Agreement as a whole, is invalidated, rendered null, or set aside by a court of competent jurisdiction, the parties agree to be bound by the terms of this Section 18, which shall survive such invalidation, nullification, or setting aside.

Compliant
129
Section 19 - Liability Insurance
130
A. TBC shall maintain, or cause to be maintained, in force during the construction of the Project, pursuant to this Agreement, public liability and property damage insurance, including personal injury, contractual, and owned and non-owned vehicles and equipment, with such coverage and limits as may be reasonably requested by City from time to time, but in no event for less than the sum of one million dollars per occurrence and two million dollars in the aggregate.

Compliant
131
B. Public liability insurance policy or policies shall name City as an additional insured, and any policy or policies shall contain cross-liability endorsements. An endorsement shall be provided which states the coverage is primary insurance and that no other insurance affected by City will be called upon to contribute to a loss under this coverage.

Compliant
132
C. TBC shall provide the City with a certificate and endorsement, in forms satisfactory to the City, evidencing such insurance coverage or coverages shall be filed with City prior to construction of the Project, and the certificate and endorsement shall provide that such insurance coverage will not be canceled or reduced without at least thirty (30) days' prior written notice to City.

Compliant
133
D. If such coverage is canceled or reduced, TBC shall, within fifteen (15) days after receipt of written notice from City of such cancellation or reduction in coverage, but in no event later than the effective date of cancellation or reduction, file with City a certificate showing that the required insurance has been reinstated or provided through another insurance company or companies. Upon failure to so file such certificate, City may, without further notice and at its option, procure such insurance coverage at TBC's expense, and TBC shall promptly reimburse City for such expense upon receipt of billing from City.

Compliant

Page 7 ends

8Exported on April 17, 2023 4:39:24 PM PDT
128
DA Section Condition/Requirement Status Comments
134
E. The insurance required under this Section shall neither supersede nor replace the insurance required under the terms of the PSA and the PM. The insurance policies required under this Section shall be in addition to the insurance requirements of the PSA and the PM; however, insurance obtained by TBC under the PSA or PM that affords the same or greater coverage than described in this Section shall satisfy these requirements.

Compliant
135
Section 20 - Notices
136
Any notice or communication required hereunder between City or TBC shall be in writing, and may be given either personally or by registered mail, return-receipt requested. Notice, whether given by registered mail or personal delivery, shall be deemed to have been given and received on the actual receipt by any of the addresses designated below as the party to whom notices are to be sent. Any party hereto may at any time, upon written notice to the other party hereto, designate any other address in substitution of the address to which such notice or communication shall be given. Such notices or communications shall be given to the parties at their addresses set forth below:

Not Applicable
137 (a) City of Pittsburg, Marc Grisham, 65 Civic Avenue, Pittsburg, CA 94565 138 (b) With copies to: Meyers Nave, Attn: Ruthann G. Ziegler, 555 Capitol Mall, Suite 1200, Sacramento, CA 95814
139 (c) And: Russ Townsend 440 Fifth Street West, Suite B, Sonoma, CA 95476 140
(d) Notices to TBC shall be addressed to: David J. Parquet, Trans Bay Cable LLC, c/o/ Babcock & Brown, Power Operating Partners LLC, 2 Harrison Street, Sixth Floor, San Francisco, CA 94105, Phone: (415) 512-1515, Fax: (415) 267-1500
141
(e) With a copy to: General Counsel, Trans Bay Cable LLC, c/o Babcock & Brown, Power Operating Partners LLC, 2 Harrison Street, Sixth Floor, San Francisco, CA 94105, Phone: (415) 512-1515, Fax: (415) 267- 1500
142
Section 21 - Exhibits
143

21.01 Designation of Exhibits. The reference to a specified Exhibit in this Agreement is a reference to a certain one of the exhibits listed below, as determined by the accompanying letter designation.

Not Applicable
144 Exhibit A: Project Site
145 Exhibit B: Project Description
146 21.02 Incorporation by Reference. All exhibits are deemed incorporated by reference into this Agreement Not Applicable 147
Section 22 - Severability
148
If any term, provision, covenant or condition of this Agreement is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall continue in full force and effect, unless enforcement of this Agreement as so invalidated would be unreasonable or grossly inequitable under all the circumstances or would frustrate the purposes of this Agreement.

Not Applicable
149
Section 23 - Entire Agreement
150
This Agreement and the Exhibits attached hereto contain all the representations and the entire agreement between the parties with respect to the subject matter hereof. Except as set forth in the PDA and certain confidentiality agreements or as otherwise specified in this Agreement and the Exhibits hereto, any prior correspondence, memoranda, agreements, warranties or representations are superseded in total by this Agreement and Exhibits hereto.

Not Applicable
151
Section 24 - Counterparts
152 This Agreement may be executed in duplicate counterpart originals, each of which is deemed to be an original, and all of which when taken together shall constitute one and the same instrument.

Not Applicable

Page 8 ends

8Exported on April 17, 2023 4:39:24 PM PDT
129
Resolution No. 23- 1 May 1, 2023

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Periodic Review of Edgewater )
Apartments Development Agreement )
Between The City of Pittsburg and ) R ESOLUTION NO. 23- Sunnyside Pittsburg, LLC. and )
Determination as to Compliance )
With Development Agreement )

The Pittsburg City Council DOES RESOLVE as follows:

WHEREAS, a Development Agreement between the City of Pittsb urg and Sunnyside Pittsburg, LLC, was executed on Apr il 18 , 2018, for the Edgewater Apartments project; and

WHEREAS, California Government Code Section 65864 et seq. (“Development Agreement Statutes”) authorizes and regulates the execution of development agreements (“DAs") between certain public entities and persons who desire to develop private property within a public entity’s jurisdiction; and

WHEREAS, pursuant to the Development Agreement Statutes, the City established procedures for the consideration of DA applications by property owners or other persons having an interest in property within City’s jurisdiction; and

WHEREAS, Section 65865.1 requires City to conduct a periodic review of the City’s active Development Agreements, at which time each respective developer is required to demonstrate good faith compliance with the terms of the Devel opment Agreement (“Periodic Review”); and

WHEREAS, if, as a result of the Periodic Review, the City finds and determines, on the basis of substantial evidence, that a developer has not complied in good faith with the terms and conditions of the Development Agreement, the City may terminate or modify the DA pursuant to the Development Agreement Statutes; and

WHEREAS, the last periodic review of t he Edgewater Development Agreement was conducted, and on December 21, 2020, the City Council determined that t he developer was in compliance with the terms of the Development Agreement.

NOW, THEREFORE, the City Council finds and determines as follows:

Section 1. Findings

The City Council hereby finds and determines that the above recitals are true and correct and have served as the basis, in part, for the findings and actions of the City 130
Resolution No. 23- 2 May 1, 2023

Council set forth below.

Section 2. Compliance with Development Agreement

The City Council hereby finds and determines that , based on the information provided by the Developer an d City Staff, as well as the information contained in the "Edgewater D A – 2022 Annual Review ", attached hereto and incorporated herein by reference as "Exhibit 1, ” the D eveloper has demonstrated good faith compliance with the Development Agreement.

Section 3. Certificate of Compliance

The City Council hereby directs and authorizes the City Manager to issue a certificate codifying the "Finding of Compliance" for Edgewater Development Agreement in a form that can be recorded by the Developer.

Section 4. Certification

The City Clerk shall certify the adoption of this Resolution.

Section 5. Effective Date

This Resolution shall take effect immediately upon adoption.

PASSED AND ADOPTED by the City Council of the Cit y of Pittsburg at a regular meeting on the 1st day of May, 2023, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

_____________________________
Shanelle Scales-Preston, Mayor

ATTEST:

______________________________
Alice E. Evenson, City Clerk
131
Exhibit 1 - Edgewater DA - 2022 Annual Review Summary Table Section and Title Terms Status Notes
1 DA Term
2 2.01 - Effective Date
3 2.01 - End Date
4 2.02 - Term
5 Obligations of Developer (ARTICLE IV)
6 3.01 - Obligations of Developer In Compliance
7 3.02 - Facility Reserve Charges
Developer agrees to pay City’s Facility Reserve Charges (“FRC”) as set or modified by the City Council from time to time
8 3.03 - Water Infastructure Developer shall comply with the 2015 Water System Master Plan, as amended. In Compliance 9 3.04 - Applicable Fees City may levy development fees and charges In Compliance 10 3.05 - Applicable Fee Adjustments
Developer shall pay fees and charges consistent with Section 3.04 above, and the applicable adjustments currently provided in such fees, and as modified from time to time by the City, whether such adjustment or modification is an increase or decrease. 11 3.06 - City TIF
Developer shall pay the City Local Traffic Mitigation Fee, which fee is necessary to finance unmet City traffic improvement needs in the amount in effect as of the Effective Date
12 3.07 - Regional TIF
Developer shall the ECCRFA Regional Transportation Development Impact Mitigation Fee (PMC Chapter 15.103) (the “RTDIM”) amount in effect when the Developer obtains a Building Permit.
13 3.08 - Fees, Assessments, Taxes Developer pay listed fees, assessments, taxes In Compliance 14 3.09 - C.3 Facilities Developer to construct biorention (C.3) facility offsite In Compliance 15 3.10 - Landscaping in C.3
Developer shall provide a Central Irrigation System that is compatible with Rainmaster DX 2 Evolution, or as specified in the City’s most current Standard Specifications, with a remote controller included with the package. The installation of this system shall be certified by a John Deere Landscapes United Greentech representative prior to the City’s acceptance of the installation.
16 3.11 - Security Improvements
Developer install security cameras with Chief of Police. Developer to pay costs within 30 days of receipt of invoice
In Compliance
17 3.12 - Bike Share Station
Developer shall pay to the City $9,000 per year, for five years, beginning with the effective date of this Agreement. The City shall use these funds to develop a bike share station which, at the City’s discretion, may be located on the same parcel as the C.3 facilities serving the Project. In the event the City does not maintain a bike share program, the developer shall not be required to provide these funds.

Delete City Currently does not maintain a Bike
Share Facility Contract
18 3.13 - Sidewalk Relating to Bus Stop
Developer to install 8ft sidewalk west of Loverridge; Curb ramp at the eastern side of driveway; two full trash capture devices
In Compliance Work completed in 2020.
19 3.14 - Offsite Recreational Amenities
Developer to install improvements to Assessor’s Parcel Number 073-190-012: 1) a six- foot wide multiuse trail, at least one-quarter mile in length; 2) two benches along the trail; 3) solar-powered trail lighting; 4) a six-foot wide sidewalk, and all necessary curb ramps, crosswalks, or other required safety and accessibility improvements In Progress
20 3.15 - Disclosure of Sourrounding Industrial Uses Developer to provide disclosure of industrial uses In Compliance 21 3.16 - Crime Free Multifamily Housing Program Developer to participate in the Police Crime Free MF Housing Program In Compliance 22 OBLIGATIONS OF CITY (ARTICLE IV)
23 4.01 - Obligations of City
The parties acknowledge and agree that Developer’s agreement to perform and abide by its covenants and obligations set forth in this Agreement, including Developer’s decision to process the siting of the Project in the City, is a material consideration for City’s agreement to perform and abide by the long-term covenants and obligations of City, as set forth herein.

In Compliance
24 4.02 (a) - Availability of Public Services (General) Capacity for Water Services In Compliance 25 4.02 (b) - Construction Water
City shall make construction water available to the Project by allowing the Project access to City’s existing water supply infrastructure, at a location reasonably determined by the City, at Developer’s cost and on those terms and conditions and charges customarily applied by City to similar projects consistent with City standards. Developer shall provide backflow prevention for all points of connection to the City’s potable water supply system and the volume of water consumed shall be tracked with the use of a City-issued hydrant meter. City shall also permit Developer to install such temporary construction water pipelines and related infrastructure as reasonably necessary to provide construction water to the Project site for Developer’s use in any and all Project grading and construction operations, as long as such water is unrelated to potable use.

In Compliance
26 4.03 - Developer's Right to Rebuild
City agrees that Developer, in Developer sole’s discretion, may renovate or rebuild the Project within the Term of this Agreement should it become necessary due to natural disaster, changes in seismic requirements, acts of God, acts of terrorism, or damage to work in progress by reason of fire, floods or other casualties.

Not Applicable

Page 1 ends

10Exported on April 17, 2023 1:04:20 PM PDT
132
Section and Title Terms Status Notes
27 4.04 - Reimbursement of Infrastructure Costs (a) (b) Unless otherwise provided for herein, to the extent Developer incurs costs related to the planning and construction of traffic infrastructure, water delivery infrastructure, , sewer infrastructure or other public infrastructure required by City or this Agreement for the Project that exceed the Project’s fair share obligation for such infrastructure, City shall reimburse Developer for the City’s portion of such costs (including any management fees provided for in this Agreement), subject to City’s prior verification through inspection of the construction that is subject to such reimbursement and upon final acceptance of the infrastructure by the City.

Not Applicable
28 4.05 - Park Fee Credit
Developer and City agree that the park in-lieu fee valuation is currently Ten Dollars and Twenty-Seven Cents per square foot ($10.27/sf foot unless City adopts a lower fee in which case the lower fee shall apply), increased annually by the CPI for the San Francisco-Oakland area, with the first increase implemented in January 2019 reflecting 2018 increases. Developer and City agree that Developer shall receive partial park fee credit for the on-site recreational improvements in the Project.

In Compliance
29 COOPERATION - IMPLEMENTATION (ARTICLE V)
30 5.01 - Processing Application for Subsequent
Approvals
The parties agree that all Subsequent Approvals shall be processed by City in a manner consistent with the following provisions.(a)Standard of Review. By adopting the Project Approvals, City has made a final policy decision that the Project is in the best interests of the public health, safety and general welfare. Accordingly, City shall not use its discretionary authority in considering any application for a Subsequent Approval to change the policy decisions reflected by the Project Approvals or otherwise prevent or delay development of the Project as set forth in the Project Approvals. Instead, the Subsequent Approvals shall be deemed tools to implement those final policy decisions and shall be issued by City so long as they comply with this Agreement and Applicable Law, as defined below, and are not inconsistent with the Project Approvals as set forth above and meet the intent and comply with any City adopted Designed Guidelines, as applicable. To the extent permitted by law, City shall not use its discretionary authority in considering these Subsequent Approval applications to revisit or frustrate the policy decisions or material terms reflected by the Project Approvals. Developer agrees that development under this Agreement shall comply with provisions reflected in Uniform Codes (whether building, fire, plumbing, or other applicable uniform codes) which may be adopted subsequent to the Effective Date of this Agreement. (b)Basis for Denial. City may deny an application for a Subsequent Approval only if such application does not comply with this Agreement or Applicable Law, defined below, or does not substantially comply with the Project Approvals (provided, however, that inconsistency with the Project Approvals shall not constitute grounds for denial of a Subsequent Approval which is requested by Developer as an amendment to that Project Approval). City may approve an application for such a Subsequent Approval subject to any conditions necessary to bring the Subsequent Approval into compliance with this Agreement or Applicable Law, or as is necessary to make this Subsequent Approval consistent with the Project Approvals. If City denies any application for a Subsequent Approval, City shall specify in writing the reasons for such denial and may suggest a modification which would be approved by City.

Compliant
31 5.02- Timely Submittals by Developer
Developer acknowledges that City cannot expedite processing of the Subsequent Approvals until Developer submits complete applications on a timely basis. Developer shall use its best efforts to (a) provide to City in a timely manner any and all documents, applications, plans, and other information necessary for City to carry out its obligations hereunder; and (b) cause Developer’s planners, engineers, and all other consultants to provide to City in a timely manner all such documents, applications, plans and other necessary materials as set forth in the Applicable Law. It is the express intent of Developer and City to cooperate and diligently work to obtain any and all Subsequent Approvals consistent with this Agreement.

Compliant
32 5.03- Timely Processing by City
Upon submission by Developer of all appropriate applications and processing fees for any Subsequent Approval, City shall promptly and diligently commence and complete all steps necessary to act on the Subsequent Approval applications including, without limitation, (a) providing at Developer’s expense and subject to Developer’s request and prior written approval, reasonable overtime staff assistance and/or staff consultants for planning and processing of each Subsequent Approval application; (b) if legally required, providing notice and holding public hearings; and (c) acting on any such Subsequent Approval application. If Developer elects to request and approve the use of overtime staff assistance or staff consultants for planning and processing of any Subsequent Approval pursuant to this Section 5.03, Developer’s reimbursement to City for such services shall be made in amount equal to City’s actual costs of providing such services, in accordance with standard City practice.

Compliant
33 5.04-Other Government Permits
At Developer’s sole discretion and in accordance with Developer’s construction schedule, Developer shall apply for such other permits and approvals as may be required by other governmental or quasi-governmental entities in connection with the development of, or the provision of services to, the Project. City shall cooperate with Developer in its efforts to timely obtain such permits and approvals and shall, from time to time, at the request of Developer, use its best efforts to ensure the timely availability of such permits and approvals.

Compliant
34 5.05 - Lighting and Landscaping District, Park
Maintenance, C.3 Facilities
Developer understands that the Project Site is included in the City’s existing Citywide Landscaping and Lighting Assessment District, as established pursuant to City Resolution No. 88 7324 (“LLD”). Developer agrees that the base assessment applies to the Project and is subject to increase, provided any such increase of the base assessment imposed uniformly or similarly situated properties by City in a manner consistent with State law.

Developer further agrees that the base assessment shall be levied upon recordation of each of the Project’s final maps. The parties agree that the base LLD assessment described herein shall finance, among other things, the maintenance of any and all landscape improvements and the maintenance of the parks.

Compliant

Page 2 ends

10Exported on April 17, 2023 1:04:20 PM PDT
133
Section and Title Terms Status Notes
35 5.06- Park Maintenance CFD 2007
Developer agrees that the Project Site will be annexed into the City’s existing Community Facilities District 2007-1 for Park Maintenance (CFD 2007-1). The rate of the CFD 2007-1 fee is subject to City Council Resolution No. 07-10698. Developer shall complete annexation of the subject property into the CFD 2007-01 prior to the issuance of any building permits.

Compliant
36 5.07- Maintenance of Project. Facilities CFD 2016-1
Developer agrees that the Project Site will be annexed into the City’s existing Community Facilities District 2016-1 for maintenance of stormwater treatment facilities (CFD 2016-1), such as the bioretention basin as described in Section 3.09. Developer shall complete annexation of the property into the CFD 2016-01 prior to the issuance of any building permits.

Compliant
37 5.08 - Public Safety Services CFD 2005-1
Developer agrees that the Project Site will be annexed into the City’s existing Community Facilities District 2017-1 for Fire Facilities and Fire Safety and Emergency Services (CFD 2017-1). The rate of the CFD 2017-1 fee is subject to City Council Resolution No. 17- 13311. Developer shall complete annexation of the property into the CFD 2017-01 prior to the issuance of any building permits.

Compliant
38 5.09 - Fire Facilities/Safety and Emergency Services CFD 2017-1
Developer agrees that the Project Site will be annexed into the City’s existing Community Facilities District 2017-1 for Fire Facilities and Fire Safety and Emergency Services (CFD 2017-1). The rate of the CFD 2017-1 fee is subject to City Council Resolution No. 17- 13311. Developer shall complete annexation
Compliant
39 5.10 - Parkland Dedication In Lieu Fee
Developer shall pay an In-Lieu Parkland Dedication Fee to the Engineering Department prior to the issuance of a building permit for the Project per PMC Section 17.32.020.D.2.

The park in-lieu fee amount shall be calculated using the rate in place at the time of issuance of a building permit, which is increased annually by the CPI for the San Francisco-Oakland area, with the first increase implemented in January 2018 reflecting 2017 increases.

Compliant
40 5.11- Assessment Districts or Other Funding
Mechanisms
Developer understands that the Project Site is included in the City’s existing Citywide Landscaping and Lighting Assessment District, as established pursuant to City Resolution No. 88 7324 (“LLD”). Developer agrees that the base assessment applies to the Project and is subject to increase, provided any such increase of the base assessment imposed uniformly or similarly situated properties by City in a manner consistent with State law.

Developer further agrees that the base assessment shall be levied upon recordation of each of the Project’s final maps. The parties agree that the base LLD assessment described herein shall finance, among other things, the maintenance of any and all landscape improvements and the maintenance of the parks.

Compliant
41 5.12 - Warrany Bonds
Developer agrees that every infrastructure improvement dedicated to City (except landscaping, unimproved real property or open space dedications) pursuant to this Agreement shall be accompanied by a one (1) year warranty bond in a form and in an amount, and with a surety acceptable to City, or otherwise as determined in the applicable Subdivision Improvement Agreement.

Complaint
42 5.13 General Plan Maintenance Fee
Developer agrees to pay a development related fee to help fund the maintenance of the Pittsburg General Plan. The General Plan Maintenance Fee will be One Hundred Twenty-Five Dollars ($125) per dwelling unit.

Compliant
43 Standards, Laws, and Procedures Governing the
Project (ARTICLE VI)
44 6.01-Vested Right to Develop
Developer shall have a vested right to develop the Project on the Project Site in substantial conformance with the terms and conditions of this Agreement, the Project Approvals (as and when issued), the Subsequent Approvals (as and when issued), and amendments thereto as shall, from time to time, be approved pursuant to this Agreement.

Nothing in this Section 6.01 shall be deemed to eliminate or diminish the requirement of Developer to obtain any required Subsequent Approvals.

Not applicable
45 6.02-Permitted Uses Vested by this Agreement
The permitted uses of the Project Site; the density and intensity of use of the Project Site; the maximum height, bulk and size of proposed buildings; provisions for reservation or dedication of land for public purposes and the location of public improvements; the general location of public utilities; and other terms and conditions of development applicable to the Project, shall be as set forth in the Project Approvals and, as and when they are issued (but not in limitation of any right to develop as set forth in the Project Approvals), the Subsequent Approvals.

Not applicable
46 6.03- Applicable Law
“Applicable Law” shall mean the existing rules, regulations, official policies, standards and specifications governing permitted uses of the project site; governing density; and governing design, improvements, and construction standards and specifications applicable to the Project and Project site as set forth in this Agreement and the Project Approvals, and in force and effect on the Effective Date of this Agreement. However, this Agreement and this Section shall not be construed to prevent the City, in any subsequent actions applicable to the Project Site, from applying any new rules, regulations, official policies, standards, and specifications that do not conflict with those rules, regulations, official policies, standards, and specifications existing as of the Effective Date of the Agreement.

Not applicable
47 6.04-Uniform Codes
Notwithstanding any other provision of this Agreement, City may apply to the Project Site, at any time during the Term, the then current Uniform Building Code and other uniform construction codes as properly modified by City and uniformly applied on a citywide basis, and City’s then current design and construction standards for road and storm drain facilities. In no event shall any such uniform code or standard be adopted for the purpose of preventing or otherwise limiting construction of all or any part of the Project.

Not applicable

Page 3 ends

10Exported on April 17, 2023 1:04:20 PM PDT
134
Section and Title Terms Status Notes
48 6.05-Moratorium and Conflicting Enactments
To the extent consistent with State Law, if any ordinance, resolution or other measure is enacted, whether by action of City, by initiative, referendum, or otherwise, that imposes a building moratorium, a limit on the rate of development, or a voter-approval requirement which would otherwise affect the timely development of the Project on all or any part of the Project Site, City agrees that such ordinance, resolution or other measure shall not apply to the Project, the Project Site, this Agreement, the Project Approvals, or the Subsequent Approvals, if any, during the term of this Agreement, unless the building moratorium is imposed as part of a declaration of a local emergency or state of emergency as defined in Government Code Section 8558. Developer reserves the right to challenge in court any City action or inaction which Developer believes is in conflict with Applicable Law or this Agreement.

Not applicable
49 6.07-State and Federal Law
As provided in California Government Code § 65869.5, if any state or federal laws or regulations, enacted after this Agreement’s Effective Date prevent or preclude compliance with one or more provisions of this Agreement (“Changes in the Law”), such provision of the Agreement shall be modified or suspended as may be necessary to comply with such state or federal laws or regulations as may be necessary to comply with Changes in the Law, and City and Developer shall take such action as may be required pursuant to this Agreement including, without limitation, Article V and Section 10.05. Not in limitation of the foregoing, nothing in this Agreement shall preclude City from imposing on Developer any fee specifically required by State or Federal laws and regulations.

Not applicable
50 6.08-Timing of Project Construction and Completion
(a)Project Phasing. The Project may be built in phases in response to then-existing market conditions over the Term of the Agreement. Except as otherwise specifically provided by this Agreement with respect to Project infrastructure timing, City and Developer expressly agree that there is no requirement that Developer initiate or complete development of the Project or any particular phase of the Project within any particular period of time, and City shall not impose such a requirement on any Project Approval. The parties acknowledge that Developer cannot at this time predict when or the rate at which or the order in which phases will be developed. Such decisions depend upon numerous factors which are not within the control of Developer, such as market demand, interest rates, competition and other similar factors. (b)Project Time Schedule. The parties agree that Developer shall be able to develop in accordance with Developer’s own time schedule as such schedule may exist from time to time, and Developer shall determine which part of the Project Site to develop first, and at Developer’s chosen schedule. In particular, and not in limitation of any of the foregoing, since the California Supreme Court held in Pardee Construction Co. v. City of Camarillo, 37 Cal.3d 465 (1984), that the failure of the parties therein to consider and expressly provide for the timing of development resulted in a later-adopted initiative restricting the timing of development to prevail over such parties’ agreement, it is the parties’ desire to avoid that result by acknowledging that Developer shall have the right to develop the Project in such order and at such rate and at such times as Developer deems appropriate within the exercise of its subjective business judgment. Developer’s rights under this Section 6.08(b) shall be subject to the requirement that adequate infrastructure to serve each phase of the Project is constructed concurrently with such phase. The City Manager shall reasonably determine what infrastructure will be required to serve each phase of the Project, which determination shall be consistent with Applicable Law. (c)Developer Agreements. Nothing in this Agreement shall exempt Developer from completing work required by a subdivision agreement, road improvement agreement, or similar agreement in accordance with the terms thereof.

Not applicable
51 6.09-Exempting Fees, Mitigation Measures,...

Notwithstanding any other provision of this Agreement, the City agrees to exclude Developer from any and all discretionary collection agreements regarding fees, mitigation measures and similar requirements including, but not limited to, development impact fees, which other public agencies request the City to impose at City’s discretion on the Project or on the Project Site after the Effective Date through the Term of this Agreement. This Section 6.09 shall not prohibit the City from imposing on Developer any fee, mitigation measure or similar requirement or obligation that is required by a local or regional agency in accordance with local, regional, State or Federal obligations and implemented by the City in cooperation with such local, regional, state or federal agency, provided such fee, mitigation measure or similar requirement or obligation is imposed in a similar manner on similarly situated properties within the City as, for example, stormwater-related C.3 requirements and increases thereto.

Not applicable
52 6.10-City's Joint-Inspection Jurisdiction Developer acknowledges that City has joint inspection jurisdiction within other third-party governmental entities within any and all City rights-of-way and easements.

Not applicable
53 AMENDMENT (ARTICLE VII)
54 7.01- Amendment to Project Approvals, Subsequent
Approvals
Developer acknowledges that City has joint inspection jurisdiction within other third-party governmental entities within any and all City rights-of-way and easements.

Not applicable

Page 4 ends

10Exported on April 17, 2023 1:04:20 PM PDT
135
Section and Title Terms Status Notes
55 7.02- Amendment of this Agreement
To the extent permitted by State and Federal law, any Project Approval or Subsequent Approval may, from time to time, be amended or modified in the following manner:
(a)Administrative Project Amendments. Upon the written request of Developer for an amendment or modification to a Project Approval or Subsequent Approval, the City Manager or his/her designee shall determine: (i) whether the requested amendment or modification is minor when considered in light of the Project as a whole; and (ii) whether the requested amendment or modification is consistent with this Agreement, Applicable Law, applicable uniform codes and State or Federal law. If the City Manager or his/her designee finds that the proposed amendment or modification is minor in the context of the entire Project, consistent with this Agreement and Applicable Law, and will result in no new significant environmental impacts, the amendment shall be determined to be an “Administrative Project Amendment” and the City Manager or his/her designee may, except to the extent otherwise required by law, approve the Administrative Project Amendment without notice and public hearing. Without limiting the generality of the foregoing, lot line adjustments, reductions in the density, intensity, scale or scope of the Project, minor alterations in vehicle circulation patterns or vehicle access points, changes in trail alignments, minor variations in lot layouts, substitutions of comparable landscaping for any landscaping shown on any final development plan or landscape plan, variations in the location of structures that do not substantially alter the design concepts of the Project, variations in the location or installation of utilities and other infrastructure connections or facilities that do not substantially alter the design concepts of the Project, and minor adjustments to the Project Site diagram or Project Site legal description shall be treated as Administrative Project Amendments.
(b)Non-Administrative Project Amendments. Any request of Developer for an amendment or modification to a Project Approval or Subsequent Approval which is determined not to be an Administrative Project Amendment as set forth above shall be subject to review, consideration and action pursuant to the Applicable Law and this Agreement.

Not applicable
56 ASSIGNMENT, TRANSFER AND NOTICE
(ARTICLE VIII)
57 8.01-Assignment of Interests, Rights/Obligations
Developer may transfer or assign all or any portion of its interests, rights or obligations under this Agreement, the Project Approvals or Subsequent Approvals to third parties acquiring an interest or estate in the Project or any portion thereof including, without limitation, purchasers or ground lessees of lots, parcels or facilities.

Not applicable
58 8.02-Transfer Agreements
(a)In connection with the transfer or assignment by Developer of all or any portion of the Project (other than a transfer or assignment by Developer to an affiliated party, any deed of trust beneficiary or mortgagee, or a “Non-Assuming Transferee” (as defined in Section

8.03), Developer and the transferee shall enter into a written agreement (a “Transfer Agreement”) regarding the respective interests, rights and obligations of Developer and the transferee in and under the Agreement, the Project Approvals, and the Subsequent Approvals. Such Transfer Agreement may (i) release Developer from obligations under the Agreement, the Project Approvals, or the Subsequent Approvals that pertain to that portion of the Project being transferred or assigned, as described in the Transfer Agreement, provided that the transferee expressly assumes such obligations, (ii) transfer to the transferee vested rights to improve that portion of the Project being transferred and (iii) address any other matter deemed by Developer to be necessary or appropriate in connection with the transfer or assignment.
(b)Any Transfer Agreement shall be binding on Developer, City and the transferee and, unless otherwise provided for in Section 8.03 of this Agreement, shall require the City’s prior written consent, which consent shall not be unreasonably withheld. Failure by City to respond within thirty (30) days of a written request by Developer for City’s consent shall be deemed City’s approval of the Transfer Agreement in question. City may refuse to give its consent only if, in light of the proposed transferee’s reputation and financial resources, such transferee would not in City’s reasonable determination be able to perform the obligations proposed to be assumed by such transferee. Such determination shall be made by the City Manager and is appealable to the City Council. In no event, however, shall City refuse to give its consent to a proposed transferee pursuant to this Section 8.02(b) if such transferee has a net worth of at least Ten Million Dollars ($10,000,000) documented in a manner reasonably acceptable to City. Upon recordation of any Transfer Agreement in the Official Records of Contra Costa County, Developer shall automatically be released from those obligations assumed by the transferee therein. (c)Developer shall be free from any and all liabilities accruing on or after the date of any assignment or transfer with respect to those obligations assumed by a transferee pursuant to a Transfer Agreement. No breach or default hereunder by any person succeeding to any portion of Developer’s obligations under this Agreement shall be attributed to Developer, nor may Developer’s rights hereunder be canceled or diminished in any way by any breach or default by any such person.

Not applicable
59 8.03-Non-Assuming Transferees
Except as otherwise required by Developer in Developer’s sole discretion, the burdens, obligations and duties of Developer under this Agreement shall terminate with respect to, and neither a Transfer Agreement nor City’s consent shall be required in connection with (a) any single residential parcel conveyed to a purchaser, (b) any property transferred as fewer than ten (10) lots to a single retail builder or (c) any property that has been established as one or more separate legal parcels for office, commercial, open space, park, school or other nonresidential uses. The transferee in such a transaction and its successors (“Non-Assuming Transferees”) shall be deemed to have no obligations under this Agreement but shall continue to benefit from the vested rights provided by this Agreement for the duration of the Term. Nothing in this Section 8.03 shall exempt any property transferred to a Non-Assuming Transferee from payment of applicable fees and assessments or compliance with applicable conditions of approval.

Not applicable

Page 5 ends

10Exported on April 17, 2023 1:04:20 PM PDT
136
Section and Title Terms Status Notes
60 8.04-Notice of Compliance Generally
Subject to City’s finding that the facts contemplated by clauses (a) through (c) herein are true and accurate, within thirty (30) days following any written request which Developer may make from time to time, City shall execute and deliver to Developer (or to any party requested by Developer) a written “Notice of Compliance,” in recordable form, duly executed and acknowledged by City, that certifies that (a) this Agreement is unmodified and in full force and effect, or if there have been modifications hereto, that this Agreement is in full force and effect as modified and stating the date and nature of such modifications, (b) there are no current uncured defaults under this Agreement or specifying the dates and nature of any such default, and (c) any other information reasonably requested by Developer. City’s failure to deliver such notice within such time period shall constitute a conclusive presumption against City that this Agreement is in full force and effect without modification except as may be represented by the Developer and that there are no uncured defaults in the performance of the Developer, except as may be represented by the Developer. Developer shall have the right at Developer’s sole discretion, to record the Notice of Compliance.

Not applicable
61 Cooperation in the Event of Legal Challenge
62 9.01-Cooperation
(a)Developer agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents and consultants from any and all administrative, legal or equitable actions or other proceedings instituted by any person not a party to this Agreement challenging the validity of the Agreement or any Project Approval or any Subsequent Project Approval, or otherwise arising out of or stemming from this Agreement. Developer may select its own legal counsel to represent Developer’s interests at Developer’s sole cost and expense. The parties shall cooperate in defending such action or proceeding. Developer shall pay for City's costs of defense, whether directly or by timely reimbursement on a monthly basis. Such costs shall include, but not be limited to, all court costs and attorneys' fees expended by City in defense of any such action or other proceeding, plus staff and City Attorney time spent in regard to defense of the action or proceeding. The parties shall use best efforts to select mutually agreeable defense counsel but, if the parties cannot reach agreement, City may select its own legal counsel and Developer agrees to pay directly or timely reimburse on a monthly basis City for all such court costs, attorney fees, and time referenced herein. (b)Developer also agrees to indemnify, defend and hold harmless the City, its officials, officers, employees, agents and consultants from any claims, costs, damages or other liabilities for any personal injury or death, or property damage, resulting from the construction of the Project or of operations by the Developer, its officers, employees, agents or consultants, under this Agreement, except for such claims, costs, damages, or other liabilities which are caused by the sole or gross negligence of the City, its officials, officers, employees, agents, or consultants. Developer may select its own legal counsel to represent Developer’s interests at Developer’s sole cost and expense. (c)The parties agree that this Section 9.01 shall constitute a separate agreement entered into concurrently, and that if any other provision of this Agreement, or the Agreement as a whole, is invalidated, rendered null, or set aside by a court of competent jurisdiction, the parties agree to be bound by the terms of this Section 9.01, which shall survive such invalidation, nullification or setting aside.

Not applicable
63 9.02-Cure,Reapproval
(a)If, as a result of any administrative, legal or equitable action or other proceeding as described in Section 9.01, all or any portion of this Agreement, Project Approvals, or Subsequent Approvals are set aside or otherwise made ineffective by any judgment (a “Judgment”) in such action or proceeding (based on procedural, substantive or other deficiencies, hereinafter “Deficiencies”), the parties agree to use their respective best efforts to sustain and reenact or readopt this Agreement, Project Approvals, and/or Subsequent Approvals that the Deficiencies relate to, as follows, unless the parties mutually agree in writing to act otherwise:
(i)If any Judgment requires reconsideration or consideration by City of this Agreement, Project Approval, or Subsequent Approval, then the City shall consider or reconsider that matter in a manner consistent with the intent of this Agreement. If any such Judgment invalidates or otherwise makes ineffective all or any portion of this Agreement or any Project Approval, or Subsequent Approval, then the parties shall cooperate and shall cure any Deficiencies identified in the Judgment or upon which the Judgment is based in a manner consistent with the intent of this Agreement and the Judgment. Upon the parties cure of such Deficiencies, City shall then take steps consistent with the Judgment necessary readopt or reenact this Agreement and any applicable Project Approval, Subsequent Approval, or any portion thereof.
(ii)Acting in a manner consistent with the intent of this Agreement or a Judgment includes, but is not limited to, recognizing that the parties intend that Developer may develop a sixty-two (62) unit multi-family residential project, and adopting such ordinances, resolutions, and other enactments, including but not limited to a general plan amendment, rezoning, vesting subdivision map approvals, development plan approvals, PD Plan approvals, design review, improvement agreements, use permits, grading permits, building permits, lot line adjustments, sewer and water connection permits, certificates of occupancy, final development plans, development agreements, permits, resubdivisions, and any amendments to, or repealing of, any of the foregoing as are necessary to readopt or reenact all or any portion of this Agreement, Project Approvals, and/or Subsequent Approvals without contravening the Judgment.
(b)The parties agree that this Section 9.02 shall constitute a separate agreement entered into concurrently, and that if any other provision of this Agreement, or the Agreement as a whole, is invalidated, rendered null, or set aside by a court of competent jurisdiction, the parties agree to be bound by the terms of this Section 9.02, which shall survive such invalidation, nullification or setting aside.

Not applicable
64 DEFAULT; REMEDIES;TERMINATION

Page 6 ends

10Exported on April 17, 2023 1:04:21 PM PDT
137
Section and Title Terms Status Notes
65 10.01-Defaults
Any failure by either party to perform any term or provision of this Agreement, which failure continues uncured for a period of thirty (30) days following written notice of such failure from the other party (the “Complaining Party”) (unless such period is extended by mutual written consent), shall constitute a default under this Agreement. The Complaining Party’s notice (“Default Notice”) shall specify the nature of the alleged failure and, may specify the manner in which the failure satisfactorily may be cured by the other party (the “Defaulting Party”). Any failures or delays by a Complaining Party in asserting any of its rights and remedies as to any default shall not operate as a waiver of a default or of any such rights or remedies. Delays by a Complaining Party in asserting any of its rights and remedies shall not deprive the Complaining Party of its right to institute and maintain any actions or proceedings, which it may deem necessary to protect, assert, or enforce any such rights or remedies. If the nature of the alleged failure is such that it cannot reasonably be cured within such 30-day period, then no fault shall be deemed to have occurred if: (a) the cure shall be commenced at the earliest practicable date following receipt of the Default Notice; (b) the cure is diligently prosecuted to completion at all times thereafter; (c) at the earliest practicable date (if no event later than thirty (30) days after the Defaulting Party’s receipt of the Default Notice), the Defaulting Party provides written notice to the Complaining Party that the cure cannot practicably be completed within such 30-day period; and (d) the cure is completed at the earliest practicable date. In no event shall Complaining Party be precluded from exercising remedies if a default is not cured within one hundred twenty (120) days after the Notice of Default is given. Complaining Party shall not send notice to any third party, including, but not limited to, bonding and surety companies, until such time as the cure opportunities set forth above have expired unless otherwise required by applicable law. Upon the occurrence of a default under this Agreement, the Complaining Party may institute legal proceedings to enforce the terms of this Agreement or, in the event of a material default, terminate this Agreement. If the default is cured consistent with this Section, then no default shall exist, and the Complaining Party shall take no further action.

Not applicable
66 10.02-Termination
If City elects to consider terminating this Agreement due to a material default of Developer, then City shall give a notice of intent to terminate this Agreement and the matter shall be scheduled for consideration and review by the City Council at a duly noticed and conducted public hearing. As used herein, a finding of materiality shall be based on the effect of the default in relation to the size and scope of the Project.

Developer shall have the right to offer written and oral evidence prior to or at the time of said public hearings. If the City Council determines that a material default has occurred and is continuing, and elects to terminate this Agreement, City shall give written notice of termination of this Agreement to Developer by certified mail and this Agreement shall thereby be terminated sixty (60) days thereafter; provided, however, that if Developer files an action to challenge City’s termination of this Agreement within such 60-day period, then this Agreement shall remain in full force and effect until a trial court has affirmed City’s termination of this Agreement and all appeals have been exhausted (or the time for requesting any and all appellate review has expired).

Not applicable
67 10.03-Periodic Review
(a)Conducting the Periodic Review. Throughout the Term of this Agreement, at least once every twelve (12) months following the execution of this Agreement, City shall review the extent of good-faith compliance by Developer with the terms of this Agreement.

This review (the “Periodic Review”) shall be conducted by the City Manager or his/her designee and shall be limited in scope to compliance with the terms of this Agreement pursuant to California Government Code § 65865.1. Developer also agrees to pay City annually the greater of Two Thousand Five Hundred Dollars ($2,500) or the actual cost of Periodic Review Fee (not to exceed Ten Thousand Dollars ($10,000)) for the first annual review and, for subsequent reviews, the Developer’s obligation to pay annually shall be the greater of Two Thousand Five Hundred Dollars ($2,500) or the actual cost of Periodic Review Fee (not to exceed Five Thousand Dollars ($5,000)). The Two Thousand Five Hundred Dollars ($2,500) shall be increased annually thereafter by the CPI for the San Francisco Oakland Area, with the first increase implemented in January 2019 reflecting 2018 increases. Such Periodic Review Fee shall only be paid in the years in which a Periodic Review is actually conducted.
(b)Notice. At least ten (10) days prior to the Periodic Review, and in the manner prescribed in Article XII of this Agreement, City shall deposit in the mail to Developer a copy of any staff reports and documents to be used or relied upon in conducting the review and, to the extent practical, related exhibits concerning Developer’s performance hereunder. Developer shall be permitted an opportunity to respond to City’s evaluation of Developer’s performance, either orally at a public hearing or in a written statement, at Developer’s election. Such response shall be made to the City Manager. (c)Good Faith Compliance. During the Periodic Review, the City Manager shall review Developer’s good-faith compliance with the terms of this Agreement. At the conclusion of the Periodic Review, the City Manager shall make written findings and determinations, on the basis of substantial evidence, as to whether or not Developer has complied in good faith with the terms and conditions of this Agreement. The decision of the City Manager shall be appealable to the City Council. If the City Manager finds and determines that Developer has not complied with such terms and conditions, the City Manager may recommend to the City Council that it terminate or modify this Agreement by giving notice of its intention to do so, in the manner set forth in California Government Code §§ 65867 and 65868. The costs incurred by City in connection with the Periodic Review process described herein shall be shared equally by Developer and City. (d)Failure to Properly Conduct Periodic Review. If, after thirty (30) days following Developer’s notice requesting a Periodic Review, City fails to initiate the Periodic Review, such failure shall be conclusively deemed an approval by City of Developer’s compliance with the terms of this Agreement.
(e)Written Notice of Compliance. With respect to any year for which Developer has been determined or deemed to have complied with this Agreement, City shall, within thirty (30) days following a written request by Developer, provide Developer with a written notice of compliance, in recordable form, duly executed and acknowledged by City. Developer shall have the right, in Developer’s sole discretion, to record such notice of compliance.

Compliant

Page 7 ends

10Exported on April 17, 2023 1:04:21 PM PDT
138
Section and Title Terms Status Notes
68 10.04-Extension of Time of Performance
In addition to specific provisions of this Agreement, neither party shall be deemed to be in default where delays in performance or failures to perform are due to, and a necessary outcome of, war, insurrection, terrorism, strikes or other labor disturbances, walk-outs, riots, floods, earthquakes, fires, casualties, acts of God, restrictions imposed or mandated by other governmental entities (including new or supplemental environmental regulations), enactment of conflicting State or Federal laws or regulations, or judicial decisions.

Neither party shall be deemed to be in default where delays in performance or failure to perform are due to a court order arising out of or related to litigation attacking the validity of this Agreement, the Project Approvals, the Subsequent Approvals, or any permit, ordinance, entitlement or other action of a governmental agency other than City necessary for the development of the Project. Developer shall not be deemed to be in default where delays in performance or failure to perform are due to Developer’s inability to obtain materials, power or public facilities (such as water or sewer service) to the Project and unrelated to Developer’s actions or inactions and beyond Developer’s control.

Upon the properly noticed request of either party hereto, as required by Section 12.09, an extension of time for the performance of any obligation whose performance has been so prevented or delayed will be set forth in writing. The term of any such extension shall be equal to the period of the excusable delay, or longer, as may be mutually agreed upon in writing.

Not applicable
69 10.05-Legal Action
Either party may, in addition to any other rights or remedies, institute legal action to cure, correct, or remedy any default, enforce any covenant or agreement herein, enjoin any threatened or attempted violation thereof, recover damages for any default, enforce by specific performance the obligations and rights of the parties hereto, or to obtain any remedies consistent with the purpose of this Agreement.

Not applicable
70 10.06-California Law This Agreement shall be construed and enforced in accordance with the laws of the State of California.

Not applicable
71 10.07-Resolution of Disputes
With regard to any dispute involving development of the Project, the resolution of which is not provided for by this Agreement or Applicable Law, Developer shall, at City’s request, meet with City. The parties to any such meetings shall attempt in good faith to resolve any such disputes. If the parties are then unable to resolve their dispute, either party may commence mediation by providing to JAMS, or its successor, and the other party a written request for mediation, setting forth the subject of the dispute and the relief requested.

The parties will cooperate with JAMS and with one another in selecting a mediator from JAMS’ panel of neutrals, and in scheduling the mediation proceedings. The parties covenant that they will participate in the mediation in good faith, and that they will share equally in its costs. All offers, promises, conduct and statements, whether oral or written, made in the course of the mediation by any of the parties, their agents, employees, experts and attorneys, and by the mediator and any JAMS employees, are confidential, privileged and inadmissible for any purpose, including impeachment, in any litigation or other proceeding involving the parties, provided that evidence that is otherwise admissible or discoverable shall not be rendered inadmissible or non-discoverable as a result of its use in the mediation. Either party may seek equitable relief prior to the mediation to preserve the status quo pending the completion of that process. Except for such an action to obtain equitable relief, neither party may commence a civil action with respect to the matters submitted to mediation until after the completion of the initial mediation session, or ninety (90) days after the date of filing the written request for mediation, whichever occurs first. Mediation may continue after the commencement of a civil action, if the parties both agree in writing. The provisions of this Section 10.07 may be enforced by any Court of competent jurisdiction, and the party seeking enforcement shall be entitled to an award of all costs, fees and expenses, including attorney’s fees, to be paid by the party against whom enforcement is ordered. Nothing in this Section 10.07 shall in any way be interpreted as requiring that Developer and City and/or City’s designee reach agreement with regard to those matters being addressed, nor shall the outcome of these meetings be binding in any way on City or Developer unless expressly agreed to in writing by the parties to such meetings.

Not applicable
72 10.08-Attorneys' Fees
In any legal action or other proceeding brought by either party to enforce or interpret a provision of this Agreement, the prevailing party is entitled to reasonable attorneys’ fees and any related other costs incurred in that proceeding in addition to any other relief to which it is entitled.

Not applicable
73 10.09-Default by City of Developer In the event City or Developer defaults under the terms of this Agreement, City or Developer shall have all rights and remedies provided herein and under law.

Not applicable
74 NO AGENCY, JOINT VENTURE, PARTNERSHIP
75 MISCELLANEOUS
76 12.01-Incorporation of Recitals and Introductory The Recitals contained in this Agreement, and the introductory paragraph preceding the Recitals, are hereby incorporated into this Agreement as if fully set forth herein.

Not applicable
77 12.02-Enforceability
City and Developer agree that unless this Agreement is amended or terminated pursuant to the provisions of this Agreement, this Agreement shall be enforceable by any party hereto notwithstanding any change hereafter enacted or adopted (whether by ordinance, resolution, initiative, or any other means) in any applicable general plan, specific plan, zoning ordinance, subdivision ordinance, or any other land use ordinance or building ordinance, resolution or other rule, regulation or policy adopted by City that changes, alters or amends the rules, regulations and policies applicable to the development of the Project Site at the time of the approval of this Agreement as provided by California Government Code § 65866. In the event of any conflict between the provisions of this Agreement and Applicable Law, the Project Approvals or any Subsequent Approval, this Agreement shall prevail.

Not applicable
78 12.03-Findings
City hereby finds and determines that execution of this Agreement furthers public health, safety and general welfare and that the provisions of this Agreement are consistent with the General Plan.

Not applicable

Page 8 ends

10Exported on April 17, 2023 1:04:21 PM PDT
139
Section and Title Terms Status Notes
79 12.04-Severability
If any term or provision of this Agreement, or the application of any term or provision of this Agreement to a particular situation, is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining terms and provisions of this Agreement, or the application of this Agreement to other situations, shall continue in full force and effect unless amended or modified by mutual consent of the parties. Notwithstanding the foregoing, if any material provision of this Agreement, or the application of such provision to a particular situation, is held to be invalid, void or unenforceable, either City or Developer may (in their sole and absolute discretion) terminate this Agreement by providing written notice of such termination to the other party.

Not applicable
80 12-05-Other Necessary Acts
Each party shall execute and deliver to the other all such other further instruments and documents as may be reasonably necessary to carry out the Project Approvals, Subsequent Approvals and this Agreement and to provide and secure to the other party the full and complete enjoyment of its rights and privileges hereunder.

Not applicable
81 12.06-Construction
Each reference in this Agreement to this Agreement or any of the Project Approvals or Subsequent Approvals shall be deemed to refer to the Agreement, Project Approval or Subsequent Approval as it may be amended from time to time, whether or not the particular reference refers to such possible amendment. This Agreement has been reviewed and revised by legal counsel for both City and Developer, and no presumption or rule that ambiguities shall be construed against the drafting party shall apply to the interpretation or enforcement of this Agreement.

Not applicable
82 12.07- Other Miscellaneous Terms
The singular shall include the plural; the masculine gender shall include the feminine; “shall” is mandatory; “may” is permissive. If there is more than one signer of this Agreement, the signer obligations are joint and several.

Not applicable
83 12.08-Covenants Running with the Land
All of the provisions contained in this Agreement shall be binding upon the parties and their respective heirs, successors and assigns, representatives, lessees, and all other persons acquiring all or a portion of the Project, or any interest therein, whether by operation of law or in any manner whatsoever. All of the provisions contained in this Agreement shall be enforceable as equitable servitudes and shall constitute covenants running with the land pursuant to California law including, without limitation, California Civil Code § 1468. Each covenant herein to act or refrain from acting is for the benefit of or a burden upon the Project, as appropriate, runs with the Project Site and is binding upon the owner of all or a portion of the Project Site and each successive owner during its ownership of such property.

Not applicable
84 12.09- Notices
Any notice or communication required hereunder between City or Developer must be in writing, and may be given either personally, by fax (with original forwarded by regular U.S.

Mail) by registered or certified mail (return receipt requested), or by Federal Express or other similar courier promising overnight delivery. If personally delivered, a notice shall be deemed to have been given when delivered to the party to whom it is addressed. If given by facsimile transmission, a notice or communication shall be deemed to have been given and received upon actual physical receipt of the entire document by the receiving party’s facsimile machine. Notices transmitted by facsimile after 5:00 p.m. on a normal business day or on a Saturday, Sunday or holiday shall be deemed to have been given and received on the next normal business day. If given by registered or certified mail, such notice or communication shall be deemed to have been given and received on the first to occur of (a) actual receipt by any of the addressees designated below as the party to whom notices are to be sent, or (b) five (5) days after a registered or certified letter containing such notice, properly addressed, with postage prepaid, is deposited in the United States mail. If given by Federal Express or similar courier, a notice or communication shall be deemed to have been given and received on the date delivered as shown on a receipt issued by the courier. Any party hereto may at any time, by giving ten (10) days written notice to the other party hereto, designate any other address in substitution of the address to which such notice or communication shall be given. Such notices or communications shall be given to the parties at their addresses set forth below:

If to City, to:City Manager
City of Pittsburg
Civic Center
65 Civic Avenue
Pittsburg, CA 94565-2830
With Copies to:Ruthann G. Ziegler
City Attorney
Meyers Nave
555 Capitol Mall, Suite 1200
Sacramento, CA 95814
If to Developer, to:Albert D. Seeno, III
Sunnyside Pittsburg, LLC
4061 Port Chicago Hwy., Ste. H
Concord, CA 94520
With Copies to:

Sunnyside Pittsburg, LLC
Attn: Legal Department
4021 Port Chicago Hwy.

Concord, CA 94520
Not applicable
85 12.10 Entire Agreement, Counterparts and Exhibits
This Agreement is executed in two (2) duplicate counterparts, each of which is deemed to be an original. This Agreement consists of twenty-seven (27) pages and four (4) exhibits, which constitute in full the final and exclusive understanding and agreement of the parties and supersedes all negotiations or previous agreements of the parties with respect to all or any part of the subject matter hereof. All waivers of any provisions of this Agreement shall be in writing and signed by the appropriate authorities of City and Developer. The following exhibits are attached to this Agreement and incorporated herein for all purposes:

EXHIBIT A -Legal Description
EXHIBIT A-1 -Project Site Diagram
EXHIBIT B -Applicable Fees
Not applicable

Page 9 ends

10Exported on April 17, 2023 1:04:21 PM PDT
140
Section and Title Terms Status Notes
86 12.11 Recordation of Development Agreement
Pursuant to California Government Code § 65868.5, no later than ten (10) days after City enters into this Agreement, the City Clerk shall record an executed copy of this Agreement, or Memorandum thereof, in the Official Records of the County of Contra Costa. The parties agree to cooperate as to preparation, execution, and recording of a Memorandum hereof.

Not applicable
87 88
89

Page 10 ends

10Exported on April 17, 2023 1:04:21 PM PDT
141
Resolution No. 23- 1 May 1, 2023

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Periodic Review of Belle Harbor )
Development Agreement and ) RESOLUTION NO. 23-
Determination as to Compliance )
With Development Agreement )

The Pittsburg City Council DOES RESOLVE as follows:

WHEREAS, a Development Agreement between the C ity of Pittsburg and Discovery Homes, Inc. , was executed on July 22 , 20 16, for the Belle Harbor (Waterstone) Subdivision; and

WHEREAS, California Government Code Section 65864 et seq. ( “Development Agreement Statutes”) authorizes and regulates the execution of development agreements (“DAs") between certain public entities and persons who desire to develop private property within a public entity’s jurisdiction; and

WHEREAS, pursuant to the Development Agreement Statutes, the City established procedures for the consideration of DA applications by property owners or other persons having an interest in property within City’s jurisdiction; and

WHEREAS, Section 65865.1 requires City to co nduct a periodic review of the City’s active Development Agreements, at which time each respective developer is required to demonstrate good faith compliance with the terms of the Development Agreement (“Periodic Review”); and

WHEREAS, if, as a result o f the Periodic Review, the City finds and determines, on the basis of substantial evidence, that a developer has not complied in good faith with the terms and conditions of the Development Agreement, the City may terminate or modify the DA pursuant to the Development Agreement Statutes; and

WHEREAS, the last periodic review of t he Belle Harbor Development Agreement was conducted, and on December 21, 2020, the City Council determined that the developer was in compliance with the terms of the Development Agreement.

NOW, THEREFORE, the City Council finds and determines as follows:

Section 1. Recitals

The City Council hereby finds and determines that the above recitals are true and correct and have served as the basis, in part, for the findings an d actions of the City Council set forth below.

142
Resolution No. 23- 2 May 1, 2023

Section 2. Compliance with Development Agreement

The City Council hereby finds and determines that , based on the information provided by the Developer and City Staff, as well as the information contained i n the "Belle Harbor DA – 2022 Annual Review", attached hereto and incorporated herein by reference as "Exhibit 1, ” the Developer has demonstrated good faith compliance with the Belle Harbor Development Agreement.

Section 3. Certificate of Compliance

The City Co uncil hereby directs and authorizes the City Manager to issue a certificate codifying the "Finding of Compliance" for Belle Harbor in a form that ca n be recorded by the Developer.

Section 4. Certification

The City Clerk shall certify the adoption of this Resolution.

Section 5. Effective Date

This Resolution shall take effect immediately upon adoption.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 1st day of May, 2023, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

_____________________________
Shanelle Scales-Preston, Mayor

ATTEST:

______________________________
Alice E. Evenson, City Clerk

143
Exhibit 1 - Belle Harbor (Waterstone) DA - 2022 Annual Review Summary Table DA Section Condition/Requirement Status Comments Action Items 1 Article II - Effective Date; Term
2 Section 2.01 Effective Date. This Agreement shall become effective upon the date the ordinance approving this Agreement becomes effective (the “Effective Date”).

Compliant Ordinance No. 16-1409 approving the DA was adopted on June 20, 2016, with an effective date of July 22,
2016.
3 Section 2.02 Term. The term of this Agreement shall commence upon the Effective Date and continue for a period of ten (10) years (the “Term”).

Compliant Based on the effective date of July 22, 2016, the DA will expire on July 22, 2026
4 Article III - Obligations of
Developer
5 Section 3.01 Obligations of Developer Generally. The parties acknowledge and agree that the City’s agreement to perform and abide by the covenants and obligations of City set forth in this Agreement is a material consideration for Developer’s agreement to perform and abide by its long term covenants and obligations, as set forth herein. As material consideration for the long term assurances and vested rights provided by this Agreement and as a condition of approval to one or more of the Project Approvals, Developer agrees to each of the following:

Compliant to date.
6 Section 3.02 Facility Reserve Charges. Developer agrees to pay City’s Facility Reserve Charges (“FRC”) as set or modified by the City Council from time to time.

Compliant to date. Fees have been collected upon issuance of all building permits issued thus far, in accordance with those fee
rates set forth in Exhibit B of the DA.
7 Section 3.03 Water Infrastructure. Developer shall comply with the 2015 Water System Master Plan, as amended. Compliant to date. Fees have been collected upon issuance of all building permits issued thus far, in accordance with those fee
rates set forth in Exhibit B of the DA.
8 Section 3.04 Applicable Fees. City may levy development fees and charges during the term of this Agreement relative to the development of the Project Site which are in force and effect as of the Effective Date, as more particularly described and according to the payment schedule set forth on Exhibit B (“Applicable Fees”). Unless otherwise provided in this Agreement, no development fees, or charges, or categories thereof, shall be imposed on the Project other than those fees (including categories within such fees), and charges identified as Applicable Fees on Exhibit B, which exhibit shall exclusively govern the Applicable Fee payment schedule. The parties agree that any and all Project development fees, charges or exactions related to schools, fire prevention, water, sewer, stormwater, and storm drainage facilities, which are to be paid by Developer directly to third-party governmental agencies, are not subject to or within the scope of this Agreement whether such third party charges exist or are subsequently imposed by such third parties, whether directly upon Developer or through City. This provision shall not be construed to benefit any Non-Assuming Transferees, as such term is defined in herein.

Compliant to date. Fees have been collected upon issuance of all building permits issued thus far, in accordance with those fee
rates set forth in Exhibit B of the DA.
9 Section 3.05 Applicable Fee Adjustments. Developer shall pay fees and charges consistent with Section 3.04 above, and the applicable adjustments currently provided in such fees, and as modified from time to time by the City, whether such adjustment or modification is an increase or decrease. Developer retains the right to challenge the imposition of any new fees not referenced in this Agreement or the modification, amendment or adjustment of all Applicable Fees pursuant to Government Code § 66000 et seq., not already authorized by ordinances, resolutions or policies in place at the time of this Agreement’s execution. Should the City Council approve a new AB 1600 fee study and/or authorize a decrease in any of the Applicable Fees during the term of this Agreement by ordinance or by resolution, Developer shall have the option, at its sole discretion, to pay the lower fee, as may be adjusted by the applicable CPI or ENR, unless otherwise bound by separate contract or memorandum of understanding with City. In no event shall Developer receive retroactive adjustments for lower fees.

Compliant to date. Fees have been collected upon issuance of all building permits issued thus far, in accordance with those fee
rates set forth in Exhibit B of the DA.
10 Section 3.06 City Local Traffic Mitigation Fee. Developer shall pay the City Local Traffic Mitigation Fee, which fee is necessary to finance unmet City traffic improvement needs in the amount in effect as of the Effective Date and subject to adjustment in accordance with Resolution No. 07 10917 with credit for certain improvements constructed by Developer per Section 4.04 below. If the City Council approves a new AB 1600 fee study and/or authorize a decrease in any of the Applicable Fees during the term of this Agreement by ordinance or by resolution, Developer shall have the option, at its sole discretion, to pay the lower fee, as may be adjusted by the applicable CPI or ENR, unless otherwise bound by separate contract or memorandum of understanding with City. In no event shall Developer receive retroactive adjustments for lower fees.

Compliant to date. Fees have been collected upon issuance of all building permits issued thus far, in accordance with those fee
rates set forth in Exhibit B of the DA.
11 Section 3.07 Regional Traffic Fee. Developer shall pay the ECCRFA regional traffic fee should it be imposed by the City in an amount equal to or less than the amount paid by projects in the Cities of Antioch, Brentwood, and Oakley or in accordance with the existing valid Memorandum of Understanding dated June 29, 2010, as amended, whichever is less.

Compliant to date. Fees have been collected upon issuance of all building permits issued thus far, in accordance with those fee
rates set forth in Exhibit B of the DA.
12 Section 3.08 Fees, Assessments and/or Taxes to be Paid by Developer. Developer agrees to pay its fair share of any levies imposed by any assessment district, landscaping and lighting district, community facilities district, tax-exempt financing mechanisms, or other funding mechanisms related to public safety; traffic; sewer; water; fire; the prevention, mitigation, abatement, or control of geologic hazards; or other infrastructure improvements (including, without limitation, design, acquisition, construction and maintenance costs) (collectively, “Funding Mechanisms”) within the Project Site, provided that such Funding Mechanism is referenced herein and/or was legally created pursuant to applicable law.

Compliant to date. Fees have been collected upon issuance of all building permits issued thus far, in accordance with those fee
rates set forth in Exhibit B of the DA.

Page 1 ends

11Exported on April 17, 2023 11:08:36 AM PDT
144
DA Section Condition/Requirement Status Comments Action Items 13 Section 3.09 Affordable Housing. Developer shall comply with PMC 18.86.080 and City Council Resolution No. 16-13210 Condition of Approval No. 5, by constructing at least eight (8) rental secondary dwelling units within the Project. A covenant shall be recorded limiting the amount of rent that may be charged for these secondary units, consistent with the terms and conditions set forth in the affordable housing agreement. Prior to the City’s issuance of the first certificate of occupancy Developer agrees to enter into an affordable housing agreement with the City (the “Affordable Housing Agreement”) attached as Exhibit C which further memorializes the provisions of this Section 3.09 and is consistent with applicable law, including Pittsburg Municipal Code Chapter 18.50. Developer agrees that the secondary dwelling units referenced in this Section shall not be built or otherwise allowed on adjoining lots without the prior written approval of the City Manager. City agrees that Developer shall not be required to pay any additional fees (building permit, sewer, water, traffic fees, etc.) associated with any attached, affordable secondary/accessory dwelling units.

Compliant Affordable Housing Agreements were recorded for lots 11, 16, 22, 27, 32, 37, 43, and 48.
14 (a) Timing. The Affordable Housing Agreement shall establish provisions to implement the affordable housing requirements within this Agreement and shall include, but not be limited to, implementation and monitoring provisions to ensure compliance with municipal law related to affordable housing.

The agreement shall include provisions for the reasonable reimbursement of costs to the City for the administration and monitoring of the agreement.

Compliant
15 (b) Inclusionary Housing Ordinance. Notwithstanding any provision of this Agreement, in the event that the City has rescinded its respective previously adopted affordable housing ordinance and not replaced it with another affordable housing or similar ordinance, or such ordinance has been declared illegal, Developer shall not be obligated to comply with the provisions for affordable housing set forth in this Agreement. In the event, prior to or during the development of the Project, the City amends or replaces or eliminates its affordable housing ordinance which would result in a reduction in the number of secondary units Developer is obligated to construct, then the Affordable Housing Agreement shall be modified to provide for an equivalent reduction in the number of secondary units required to be constructed in the Project or elimination of the requirement.

Compliant
16 Section 3.10 C.3 Facilities. Developer shall construct C.3 facilities as provided in the Project Approvals. In accordance with the City’s NPDES permit, provision C.3.e.i.and ii., developer shall have the right to construct or participate in the funding of offsite C.3 facilities as approved by the City Engineer and memorialized by separate agreement with the City. Developer to provide appropriate funding mechanism for the continuous maintenance of these facilities in perpetuity.

Compliant Developer has annexed into 2016-1 CFD to meet requirements for alternate compliance and long term
maintenance
17 Section 3.11 Security Improvements. (a) Developer shall pay to the City the actual cost incurred by the City (not to exceed Fifty Thousand Dollars ($50,000)) towards funding the acquisition and installation of security camera(s) at the entrance to the Property. The security cameras will be installed under the supervision of the City’s Police Chief. Developer shall pay such costs within thirty (30) days of receipt of invoice. (b) Developer shall install the basic home security wiring in the Project homes (defined herein as wiring for a basic home security system on the first floor windows and doors only).

Developer shall offer one year of professional monitoring service to new homeowners. The monitoring service shall be at the election of the new homeowner.

In Progress The Police Department has secured a camera project design and estimate for installations near the entrance, and the City’s Finance Department will issue a
purchase order shortly. Once the installations have
been completed, the City will be reimbursed by the
Developer.
18 Section 3.12 Solar Roof System. Developer shall install a solar roof system on one of its model homes for example purposes only (which may consist of a few panels with photovoltaic compatibility or other comparable technologies) and offer solar installation as an option at the homeowner’s expense.

Compliant
19 Section 3.13 Tree Preservation. Developer shall replace any and all trees that are removed as part of the construction of the Project with the appropriate number of new trees pursuant to the City’s Tree Ordinance. Developer shall cause the Project to maintain said trees in an appropriate manner pursuant to the City’s Tree Ordinance. Developer shall not be required to mitigate for trees that need to be removed that are on City property.

Compliant to date. As a condition of the approved tree removal permit, the developer is required to plant 60 new trees throughout
the development as part of the approved landscaping
plan. All required trees shall be planted prior to final acceptance of the subdivision.
20 Article IV - Obligations of the
City
21 Section 4.01 Obligations of City Generally. The parties acknowledge and agree that Developer’s agreement to perform and abide by its covenants and obligations set forth in this Agreement, including Developer’s decision to process the siting of the Project in the City, is a material consideration for City’s agreement to perform and abide by the long term covenants and obligations of City, as set forth herein.

Not Applicable
22 Section 4.02 Availability of Public Services.
23 (a) General. To the extent permitted by law and consistent with its authority, City shall reserve such capacity for water services as may be necessary to serve the Project. This reservation of water infrastructure capacity shall be assured for the Term to the extent consistent with applicable law.

Compliant to date.
24 (b) Construction Water. City shall make construction water available to the Project by permitting the Project to hook up to existing City water supply infrastructure, at a location reasonably determined by the City, at Developer’s cost and on those terms and conditions and charges customarily applied by City to similar projects consistent with City standards. City shall also permit Developer to install such temporary construction water pipelines and related infrastructure as reasonably necessary to provide construction water to the Project site for Developer’s use in any and all Project grading and construction operations, as long as such water is unrelated to potable use.

Compliant to date.
25 Section 4.03 Developer’s Right to Rebuild. City agrees that Developer, in Developer sole’s discretion, may renovate or rebuild the Project within the Term of this Agreement should it become necessary due to natural disaster, changes in seismic requirements, acts of God, acts of terrorism, or damage to work in progress by reason of fire, floods or other casualties. Any such renovation or rebuilding shall be subject to the square footage and height limitations vested by this Agreement, and shall comply with the Project Approvals, the building codes existing at the time of such rebuilding or reconstruction, and the requirements of CEQA and this Agreement.

Compliant to date. There has been no need to exercise this provision of the agreement.
26 Section 4.04 Reimbursement of Infrastructure Costs.

Page 2 ends

11Exported on April 17, 2023 11:08:36 AM PDT
145
DA Section Condition/Requirement Status Comments Action Items 27 (a) Reimbursement. Unless otherwise provided for herein, to the extent Developer incurs costs related to the planning and construction of traffic infrastructure, water delivery infrastructure, the off-site water tank, pump station, sewer infrastructure or other public infrastructure required by City or this Agreement for the Project that exceed the Project’s fair share obligation for such infrastructure, City shall reimburse Developer for the City’s portion of such costs (including any management fees provided for in this Agreement), subject to City’s prior verification through inspection of the construction that is subject to such reimbursement and upon final acceptance of the infrastructure by the City. This reimbursement shall be paid within sixty (60) days after City’s final acceptance or at such other time as mutually agreed upon in writing by the parties. Developer shall be entitled to a management fee of five percent (5%) for City’s share of approved infrastructure costs, including but not limited to design and special inspection costs. The management obligations of Developer hereunder shall include contracting and managing the construction of the infrastructure, retaining copies of records, photographs and “as builts” for the improvement(s) as well as attending meetings and providing necessary reports as reasonably requested by City.

Compliant to date. There has been no need to exercise this provision of the agreement.
28 (b) City’s Authorization of Reimbursement. Notwithstanding any other provision of this Section, or of this Agreement, or of VTM provisions, City shall not be responsible to reimburse or credit Developer for any costs, including as referenced in Section 4.04(a) herein, unless prior to Developer incurring any costs for which Developer will request reimbursement from City, Developer shall first provide written documentation as to the work to be performed, the estimated costs thereof, including a not-to-exceed cap, and such other details as reasonably requested by the City Manager and the City Manager approves the proposed costs and related work. If the City Manager fails to respond within thirty (30) days of its receipt of such estimated costs, Developer shall provide a second written notice to the City Manager and to the City Engineer, if neither responds within thirty (30) days of the City’s receipt of the second request, the request shall be deemed approved. The City Manager shall have the discretion to require Developer to obtain competitive bids on any work for which Developer may request reimbursement or credit from the City where the total cost (not just the City’s share) of that work is One Hundred Thousand Dollars ($100,000) or more. City shall also have the opportunity to inspect any and all infrastructure during its construction, as well as to review any work product for which Developer requests reimbursement or credits. If mutually agreed by the parties in writing, any reimbursement due Developer pursuant to this Agreement may be satisfied by City in the form of credits, which can actually be used by Developer to offset Developer’s payment of any Applicable Fees. In the event there are not enough credits to fully satisfy the reimbursement due Developer and subject to the terms of the mutual agreement between the parties referenced in the prior sentence, City shall reimburse Developer within thirty (30) days of invoicing.

Compliant to date. There has been no need to exercise this provision of the agreement.
29 Section 4.05 Park Fee Credit. Developer and City agree that the park in-lieu fee amount will be Nine and 40/100ths Dollars ($9.40) per square foot (unless City adopts a lower fee in which case the lower fee shall apply), increased annually by the CPI for the San Francisco-Oakland area, with the first increase implemented in January 2017 reflecting 2016 increases. Developer is eligible for partial park fee credit of thirty five percent (35%) of the land area devoted to private recreational area on site.

Compliant
30 Article V - Cooperation -
Implementation
31 Section 5.01 Processing Application for Subsequent Approvals. The parties agree that all Subsequent Approvals shall be processed by City in a manner consistent with the following provisions:
32 (a) Standard of Review. By adopting the Project Approvals, City has made a final policy decision that the Project is in the best interests of the public health, safety and general welfare. Accordingly, City shall not use its discretionary authority in considering any application for a Subsequent Approval to change the policy decisions reflected by the Project Approvals or otherwise prevent or delay development of the Project as set forth in the Project Approvals. Instead, the Subsequent Approvals shall be deemed tools to implement those final policy decisions and shall be issued by City so long as they comply with this Agreement and Applicable Law, as defined below, and are not inconsistent with the Project Approvals as set forth above, and meet the intent and comply with any City adopted Designed Guidelines, as applicable. To the extent permitted by law, City shall not use its discretionary authority in considering these Subsequent Approval applications to revisit or frustrate the policy decisions or material terms reflected by the Project Approvals. Developer agrees that development under this Agreement shall comply with provisions reflected in Uniform Codes (whether building, fire, plumbing, or other applicable uniform codes) which may adopted subsequent to the Effective Date of this Agreement.

Compliant to date.
33 (b) Basis for Denial. City may deny an application for a Subsequent Approval only if such application does not comply with this Agreement or Applicable Law, defined below, or does not substantially comply with the Project Approvals (provided, however, that inconsistency with the Project Approvals shall not constitute grounds for denial of a Subsequent Approval which is requested by Developer as an amendment to that Project Approval). City may approve an application for such a Subsequent Approval subject to any conditions necessary to bring the Subsequent Approval into compliance with this Agreement or Applicable Law, or as is necessary to make this Subsequent Approval consistent with the Project Approvals. If City denies any application for a Subsequent Approval, City shall specify in writing the reasons for such denial and may suggest a modification which would be approved by City.

Compliant to date. The City has not denied any application for subsequent approvals as of 12/31/22.
34 Section 5.02 Timely Submittals by Developer. Developer acknowledges that City cannot expedite processing of the Subsequent Approvals until Developer submits complete applications on a timely basis.

Developer shall use its best efforts to (i) provide to City in a timely manner any and all documents, applications, plans, and other information necessary for City to carry out its obligations hereunder; and (ii) cause Developer’s planners, engineers, and all other consultants to provide to City in a timely manner all such documents, applications, plans and other necessary materials as set forth in the Applicable Law. It is the express intent of Developer and City to cooperate and diligently work to obtain any and all Subsequent Approvals consistent with this Agreement.

Compliant to date. Developer has not submitted any applications for subsequent approvals for the project.

Page 3 ends

11Exported on April 17, 2023 11:08:36 AM PDT
146
DA Section Condition/Requirement Status Comments Action Items 35 Section 5.03 Timely Processing by City. Upon submission by Developer of all appropriate applications and processing fees for any Subsequent Approval, City shall promptly and diligently commence and complete all steps necessary to act on the Subsequent Approval applications including, without limitation, (i) providing at Developer’s expense and subject to Developer’s request and prior written approval, reasonable overtime staff assistance and/or staff consultants for planning and processing of each Subsequent Approval application; (ii) if legally required, providing notice and holding public hearings; and (iii) acting on any such Subsequent Approval application. If Developer elects to request and approve the use of overtime staff assistance or staff consultants for planning and processing of any Subsequent Approval pursuant to this Section 5.03, Developer’s reimbursement to City for such services shall be made in amount equal to City’s actual costs of providing such services, in accordance with standard City practice.

Compliant to date. Developer has not submitted any applications for subsequent approvals for the project.
36 Section 5.04 Other Government Permits. At Developer’s sole discretion and in accordance with Developer’s construction schedule, Developer shall apply for such other permits and approvals as may be required by other governmental or quasi-governmental entities in connection with the development of, or the provision of services to, the Project. City shall cooperate with Developer in its efforts to timely obtain such permits and approvals and shall, from time to time, at the request of Developer, use its best efforts to ensure the timely availability of such permits and approvals.

Compliant to date. Developer has applied for and received all necessary permits for construction.
37 Section 5.05 Lighting and Landscaping District, Park Maintenance, C.3 Facilities. 38 (a) Developer agrees that the Project Site will be annexed into the City’s existing Lighting and Landscaping District, as established pursuant to City Resolution No. 88 7324 (“LLD”), as well as the City’s Community Facilities District 2007 1 for park maintenance and the City’s Community Facilities District 2016-1 for maintenance of C.3 facilities and, to the extent permitted by law, that the Project shall be assessed in a manner consistent with the provisions herein.

Compliant Annexation completed.
39 (b) Developer agrees that the base assessment applies to the Project and is subject to increase, provided any such increase of the base assessment imposed uniformly or similarly situated properties by City in a manner consistent with State law. Developer further agrees that the base assessment shall be levied upon recordation of each of the Project’s final maps. The parties agree that the base LLD assessment described herein shall finance, among other things, the maintenance of any and all landscape improvements and the maintenance of the parks.

Compliant Project is already in LLD
40 Section 5.06 Police Services CFD. Developer agrees to take all steps necessary to include the Project Site into the City’s existing police services Community Facilities District 2004 1, as adopted pursuant to Resolution No. 04 10071 (the “Police Services District”) at no cost to the City, in order to provide for police and other emergency services to the Project Site. This process shall be completed, to the reasonable satisfaction of the City Manager and the City Attorney, before filing the first final map on the Project. Each legal residential lot located on the Project Site will be required to pay the levy by the Police Services District no earlier than the issuance of a building permit for such lot.

Compliant Annexation completed.
41 Section 5.07 Fire Services CFD. In the event the City forms a City Community Facilities District to provide for fire protection services in the City for the Contra Costa Fire Protection District and acquisition or replacement of equipment primarily situated in the fire stations located in the City, Developer agrees to take all steps necessary to include the Project Site into the district. This inclusion of the Project into the district shall be completed, to the reasonable satisfaction of the City Manager and the City Attorney, before filing the first final map on the Project. City agrees that the levy to be assessed on each legal residential lot in the Project shall be no greater than Seventy-five Dollars ($75) and increased annually by the CPI for the San Francisco-Oakland area, with the first increase implemented in January 2016 reflecting 2015 increases. Each legal residential lot located on the Project Site will be required to pay the levy by for this district no earlier than the issuance of a certificate of occupancy for such lot (such levy shall not go into effect for any certificate of occupancy issued for model homes in the Project until such model home is transferred to a third party homebuyers).

Compliant Annexation completed.
42 Section 5.08 Railroad Avenue Specific Plan CFD. The subject property has been previously annexed into the Railroad Avenue Specific Plan (RASP) Community Facilities District 2014-1, and requires the developer pay a one-time special tax to finance the construction and/or acquisition of public facilities.

Each legal residential lot located on the Project Site will be required to pay the levy by CFD 2014-1 upon the issuance of a building permit for such lot. The rate of the CFD is subject to City Council Ordnance No. 14-1383.

Compliant to date. Fees have been collected upon issuance of all building permits issued thus far, in accordance with those fee
rates set forth in Exhibit B of the DA.
43 Section 5.09 Parkland Dedication In-Lieu Fee. The Developer shall pay an In-Lieu Parkland Dedication Fee to the Engineering Department per PMC section 17.32.020.D.2.The park in-lieu fee amount is nine dollars and forty cents ($9.40) per square foot, increased annually by the CPI for the San Francisco-Oakland area, with the first increase implemented in January 2017 reflecting 2016 increases.

Compliant
44 Section 5.10 Assessment Districts or Other Funding Mechanisms. 45 (a) City understands that City’s long term assurances to Developer concerning fees, taxes and assessments related to the Project are a material consideration for Developer agreeing to process the siting of the Project in its present location and to pay the fees, taxes and assessments described in this Agreement. City shall retain the ability to initiate or process applications for the formation of new assessment districts or other Funding Mechanisms, as defined in Section 3.08 of this Agreement, covering all or any portion of the Project site. Notwithstanding the foregoing, Developer retains all its rights to oppose the formation or proposed assessment of any new assessment district, Funding Mechanism, or any and all increases thereto, or to request or pursue assessment credits or reductions, unless otherwise provided for herein or unless such assessment, Funding Mechanism or related increases are in place and legally effective as of the date of this Agreement’s Effective Date.

Compliant to date. The City has not proposed forming any new assessment districts.

Page 4 ends

11Exported on April 17, 2023 11:08:36 AM PDT
147
DA Section Condition/Requirement Status Comments Action Items 46 (b) At the request of Developer, City shall cooperate in the formation of, or annexation to, those assessment districts, landscaping and lighting districts, community facilities districts, tax-exempt financing mechanisms, or other Funding Mechanisms that Developer and City determine are needed to fund infrastructure improvements and to ensure the orderly development of the Project, at no cost to the City. City shall diligently and expeditiously process applications by Developer necessary to establish such Funding Mechanisms as long as (i) the application complies with law, (ii) is consistent with City’s standards, and (iii) provides for a lien to value ratio and other financial terms that are reasonably acceptable to City, and which will result in no commitment of City. City shall diligently seek to sell any bonds to be issued and secured by such assessments upon the best terms reasonably available in the marketplace. Any and all costs associated with this Section shall be borne and/or advanced by Developer.

Compliant to date.
47 Section 5.11 Warranty Bonds. Developer agrees that every infrastructure improvement dedicated to City (except landscaping, unimproved real property or open space dedications) pursuant to this Agreement shall be accompanied by a one (1) year warranty bond in a form and in an amount, and with a surety acceptable to City, or otherwise as determined in the applicable Subdivision Improvement Agreement.

Compliant City accepted the public improvements for continuous maintenance in 2017, warrant bonds have since expired
48 Section 5.12 General Plan Maintenance Fee. Developer agrees to pay a development related fee to help fund the maintenance of the Pittsburg General Plan. The General Plan Maintenance Fee will be $125.00 per building permit.

Compliant to date. The Developer has paid the General Plan Maintenance Fee upon issuance of each building permit.
49 Article VI - Standards, Laws
and Proceedures Governing the
Project
50 Section 6.01 Vested Right to Develop. Developer shall have a vested right to develop the Project on the Project Site in substantial conformance with the terms and conditions of this Agreement, the Project Approvals (as and when issued), the Subsequent Approvals (as and when issued), and amendments thereto as shall, from time to time, be approved pursuant to this Agreement. Nothing in this Section

6.01 shall be deemed to eliminate or diminish the requirement of Developer to obtain any required Subsequent Approvals.

Compliant to date.
51 Section 6.02 Permitted Uses Vested by This Agreement. The permitted uses of the Project Site; the density and intensity of use of the Project Site; the maximum height, bulk and size of proposed buildings; provisions for reservation or dedication of land for public purposes and the location of public improvements; the general location of public utilities; and other terms and conditions of development applicable to the Project, shall be as set forth in the Project Approvals and, as and when they are issued (but not in limitation of any right to develop as set forth in the Project Approvals), the Subsequent Approvals.

Compliant to date.
52 Section 6.03 Applicable Law. “Applicable Law” shall mean the existing rules, regulations, official policies, standards and specifications governing permitted uses of the project site; governing density; and governing design, improvements, and construction standards and specifications applicable to the Project and Project site as set forth in this Agreement and the Project Approvals, and in force and effect on the Effective Date of this Agreement. However, this Agreement and this Section shall not be construed to prevent the City, in any subsequent actions applicable to the Project Site, from applying any new rules, regulations, official policies, standards, and specifications that do not conflict with those rules, regulations, official policies, standards, and specifications existing as of the Effective Date of the Agreement.

Compliant to date.
53 Section 6.04 Uniform Codes. Notwithstanding any other provision of this Agreement, City may apply to the Project Site, at any time during the Term, the then current Uniform Building Code and other uniform construction codes as properly modified by City and uniformly applied on a citywide basis, and City’s then current design and construction standards for road and storm drain facilities. In no event shall any such uniform code or standard be adopted for the purpose of preventing or otherwise limiting construction of all or any part of the Project.

Compliant to date.
54 Section 6.05 Moratorium and Conflicting Enactments. To the extent consistent with State Law, if any ordinance, resolution or other measure is enacted, whether by action of City, by initiative, referendum, or otherwise, that imposes a building moratorium, a limit on the rate of development, or a voter-approval requirement which would otherwise affect the timely development of the Project on all or any part of the Project Site, City agrees that such ordinance, resolution or other measure shall not apply to the Project, the Project Site, this Agreement, the Project Approvals, or the Subsequent Approvals, if any, during the term of this Agreement, unless the building moratorium is imposed as part of a declaration of a local emergency or state of emergency as defined in Government Code Section 8558.

Developer reserves the right to challenge in court any City action or inaction which Developer believes is in conflict with Applicable Law or this Agreement.

Compliant to date. No moratoria or conflicting enactments were adopted during this review period.
55 Section 6.06 Life of Subdivision Maps, Development Approvals, and Permits. To the extent consistent with Applicable Law, the term of any subdivision map or any other map, permit, rezoning or other land use entitlement approved as a Project Approval or Subsequent Approval shall automatically be extended for the duration of this Agreement, including any extensions. The term of this Agreement and any subdivision map or other Project Approval or Subsequent Approval shall not include any period of time during which any applicable development moratorium (including, but not limited to, a water or sewer moratorium) or the actions of other public agencies that regulate land use, development or the provision of services to the land, prevents, prohibits or delays the construction of the Project. The term of this Agreement and any subdivision map or other Project Approval or Subsequent Approval shall not include any period of time during which any applicable court order or other legal requirement prevents the processing of any Subsequent Approval or prevents any Project development activities.

Compliant Construction of project is scheduled to be completed prior to the expiration of all approvals.

Page 5 ends

11Exported on April 17, 2023 11:08:36 AM PDT
148
DA Section Condition/Requirement Status Comments Action Items 56 Section 6.07 State and Federal Law. As provided in California Government Code § 65869.5, if any state or federal laws or regulations, enacted after this Agreement’s Effective Date prevent or preclude compliance with one or more provisions of this Agreement (“Changes in the Law”), such provision of the Agreement shall be modified or suspended as may be necessary to comply with such state or federal laws or regulations as may be necessary to comply with Changes in the Law, and City and Developer shall take such action as may be required pursuant to this Agreement including, without limitation, Article V and Section 10.05. Not in limitation of the foregoing, nothing in this Agreement shall preclude City from imposing on Developer any fee specifically required by State or Federal laws and regulations.

Compliant There has been no need to exercise this provision of the agreement.
57 Section 6.08 Timing of Project Construction and Completion. 58 (a) Project Phasing. The Project may be built in phases in response to then-existing market conditions over the Term of the Agreement. Except as otherwise specifically provided by this Agreement with respect to Project infrastructure timing, City and Developer expressly agree that there is no requirement that Developer initiate or complete development of the Project or any particular phase of the Project within any particular period of time, and City shall not impose such a requirement on any Project Approval. The parties acknowledge that Developer cannot at this time predict when or the rate at which or the order in which phases will be developed. Such decisions depend upon numerous factors which are not within the control of Developer, such as market demand, interest rates, competition and other similar factors.

Compliant to date. Construction of project is scheduled to be completed in multiple phases.
59 (b) The parties agree that Developer shall be able to develop in accordance with Developer’s own time schedule as such schedule may exist from time to time, and Developer shall determine which part of the Project Site to develop first, and at Developer’s chosen schedule. In particular, and not in limitation of any of the foregoing, since the California Supreme Court held in Pardee Construction Co. v. City of Camarillo, 37 Cal.3d 465 (1984), that the failure of the parties therein to consider and expressly provide for the timing of development resulted in a later-adopted initiative restricting the timing of development to prevail over such parties’ agreement, it is the parties’ desire to avoid that result by acknowledging that Developer shall have the right to develop the Project in such order and at such rate and at such times as Developer deems appropriate within the exercise of its subjective business judgment. Developer’s rights under this Section 6.08(b) shall be subject to the requirement that adequate infrastructure to serve each phase of the Project is constructed concurrently with such phase. The City Manager shall reasonably determine what infrastructure will be required to serve each phase of the Project, which determination shall be consistent with Applicable Law.

Compliant to date.
60 (c) Nothing in this Agreement shall exempt Developer from completing work required by a subdivision agreement, road improvement agreement or similar agreement in accordance with the terms thereof.

Compliant to date.
61 Section 6.09 Exempting Fees, Mitigation Measures and Similar Requirements Imposed by Outside Agencies.

Notwithstanding any other provision of this Agreement, the City agrees to exclude Developer from any and all discretionary collection agreements regarding fees, mitigation measures and similar requirements including, but not limited to, development impact fees, which other public agencies request the City to impose at City’s discretion on the Project or on the Project Site after the Effective Date through the Term of this Agreement. This Section 6.09 shall not prohibit the City from imposing on Developer any fee, mitigation measure or similar requirement or obligation that is required by a local or regional agency in accordance with local, regional, State or Federal obligations and implemented by the City in cooperation with such local, regional, state or federal agency, provided such fee, mitigation measure or similar requirement or obligation is imposed in a similar manner on similarly situated properties within the City as, for example, stormwater-related C.3 requirements and increases thereto.

Compliant to date.
62 Section 6.10 City’s Joint-Inspection Jurisdiction. Developer acknowledges that City has joint inspection jurisdiction within other third-party governmental entities within any and all City rights-of-way and easements.

Compliant to date.
63 Article VII - Amendment
64 Section 7.01 Amendment to Project Approvals, Subsequent Approvals. To the extent permitted by State and Federal law, any Project Approval or Subsequent Approval may, from time to time, be amended or modified in the following manner:
65 (a) Administrative Project Amendments. Upon the written request of Developer for an amendment or modification to a Project Approval or Subsequent Approval, the City Manager or his/her designee shall determine: (i) whether the requested amendment or modification is minor when considered in light of the Project as a whole; and (ii) whether the requested amendment or modification is consistent with this Agreement, Applicable Law, applicable uniform codes and State or Federal law.

If the City Manager or his/her designee finds that the proposed amendment or modification is minor in the context of the entire Project, consistent with this Agreement and Applicable Law, and will result in no new significant environmental impacts not addressed and mitigated in the EIR, the amendment shall be determined to be an “Administrative Project Amendment” and the City Manager or his/her designee may, except to the extent otherwise required by law, approve the Administrative Project Amendment without notice and public hearing. Without limiting the generality of the foregoing, lot line adjustments, reductions in the density, intensity, scale or scope of the Project, minor alterations in vehicle circulation patterns or vehicle access points, changes in trail alignments, minor variations in lot layouts, substitutions of comparable landscaping for any landscaping shown on any final development plan or landscape plan, variations in the location of structures that do not substantially alter the design concepts of the Project, variations in the location or installation of utilities and other infrastructure connections or facilities that do not substantially alter the design concepts of the Project, and minor adjustments to the Project Site diagram or Project Site legal description shall be treated as Administrative Project Amendments.

Compliant to date. The developer has worked with staff to implement a revised refuse pickup plan.
66 (b) Non-Administrative Project Amendments. Any request of Developer for an amendment or modification to a Project Approval or Subsequent Approval which is determined not to be an Administrative Project Amendment as set forth above shall be subject to review, consideration and action pursuant to the Applicable Law and this Agreement.

Compliant to date The developer has worked with staff to request non- administrative project amendments to date, including
changes to proposed subdivision signage.
67 Section 7.02 Amendment of this Agreement. This Agreement may be amended from time to time, in whole or in part, by mutual written consent of the parties hereto or their successors in interest, as follows:

Page 6 ends

11Exported on April 17, 2023 11:08:36 AM PDT
149
DA Section Condition/Requirement Status Comments Action Items 68 (a) Administrative Agreement Amendments. The City Manager, or his/her designee, may, except to the extent otherwise required by law, enter into certain amendments of this Agreement on behalf of the City as long as any such amendment does not substantially affect (i) the Term of this Agreement, (ii) permitted uses of the Project Site, (iii) provisions for the reservation or dedication of land, (iv) conditions, terms, restrictions or requirements for subsequent discretionary actions, (v) the density or intensity of use of the Project Site or the maximum height or size of proposed buildings or (vi) monetary contributions by Developer (“Administrative Agreement Amendment”), and shall not, except to the extent otherwise required by law, require notice or public hearing before the parties may execute an amendment hereto. For purposes of this Section 7.02(a), the term “substantially affect” shall be evaluated in the context of the entire Project.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.
69 (b) Amendment Exemptions. No amendment of a Project Approval or Subsequent Approval, whether done administratively or not, shall require an amendment to this Agreement. Instead, any such matter automatically shall be deemed to be incorporated into the Project and vested under this Agreement when written and executed by both parties.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.
70 (c) Amendment Limitations. In consideration of the scope of the benefits to City set forth in this Agreement, any amendment to this Agreement shall only be subject to such new terms and conditions, including new exactions or other obligations, as are reasonably related to the impacts on City directly attributable to such amendment.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.
71 Article VIII - Assignment,
Transfer and Notice
72 Section 8.01 Assignment of Interests, Rights and Obligations. Developer may transfer or assign all or any portion of its interests, rights or obligations under this Agreement, the Project Approvals or Subsequent Approvals to third parties acquiring an interest or estate in the Project or any portion thereof including, without limitation, purchasers or ground lessees of lots, parcels or facilities.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.
73 Section 8.02 Transfer Agreements.
74 (a) In connection with the transfer or assignment by Developer of all or any portion of the Project (other than a transfer or assignment by Developer to an affiliated party, any deed of trust beneficiary or mortgagee, or a “Non-Assuming Transferee” (as defined in Section 8.03), Developer and the transferee shall enter into a written agreement (a “Transfer Agreement”) regarding the respective interests, rights and obligations of Developer and the transferee in and under the Agreement, the Project Approvals, and the Subsequent Approvals. Such Transfer Agreement may (i) release Developer from obligations under the Agreement, the Project Approvals, or the Subsequent Approvals that pertain to that portion of the Project being transferred or assigned, as described in the Transfer Agreement, provided that the transferee expressly assumes such obligations, (ii) transfer to the transferee vested rights to improve that portion of the Project being transferred and (iii) address any other matter deemed by Developer to be necessary or appropriate in connection with the transfer or assignment.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.
75 (b) Any Transfer Agreement shall be binding on Developer, City and the transferee and, unless otherwise provided for in Section 8.03 of this Agreement, shall require the City’s prior written consent, which consent shall not be unreasonably withheld. Failure by City to respond within thirty (30) days of a written request by Developer for City’s consent shall be deemed City’s approval of the Transfer Agreement in question. City may refuse to give its consent only if, in light of the proposed transferee’s reputation and financial resources, such transferee would not in City’s reasonable determination be able to perform the obligations proposed to be assumed by such transferee. Such determination shall be made by the City Manager and is appealable to the City Council. In no event, however, shall City refuse to give its consent to a proposed transferee pursuant to this Section

8.02(b) if such transferee has a net worth of at least Ten Million Dollars ($10,000,000) documented in a manner reasonably acceptable to City. Upon recordation of any Transfer Agreement in the Official Records of Contra Costa County, Developer shall automatically be released from those obligations assumed by the transferee therein.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.
76 (c) Developer shall be free from any and all liabilities accruing on or after the date of any assignment or transfer with respect to those obligations assumed by a transferee pursuant to a Transfer Agreement.

No breach or default hereunder by any person succeeding to any portion of Developer’s obligations under this Agreement shall be attributed to Developer, nor may Developer’s rights hereunder be canceled or diminished in any way by any breach or default by any such person.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.
77 Section 8.03 Non-Assuming Transferees. Except as otherwise required by Developer in Developer’s sole discretion, the burdens, obligations and duties of Developer under this Agreement shall terminate with respect to, and neither a Transfer Agreement nor City’s consent shall be required in connection with (i) any single residential parcel conveyed to a purchaser, (ii) any property transferred as fewer than ten (10) lots to a single retail builder or (iii) any property that has been established as one or more separate legal parcels for office, commercial, open space, park, school or other nonresidential uses. The transferee in such a transaction and its successors (“Non-Assuming Transferees”) shall be deemed to have no obligations under this Agreement, but shall continue to benefit from the vested rights provided by this Agreement for the duration of the Term. Nothing in this Section 8.03 shall exempt any property transferred to a Non-Assuming Transferee from payment of applicable fees and assessments or compliance with applicable conditions of approval.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.
78 Section 8.04 Notice of Compliance Generally. Subject to City’s finding that the facts contemplated by clauses (i) through (iii) herein are true and accurate, within thirty (30) days following any written request which Developer may make from time to time, City shall execute and deliver to Developer (or to any party requested by Developer) a written “Notice of Compliance,” in recordable form, duly executed and acknowledged by City, that certifies that (i) this Agreement is unmodified and in full force and effect, or if there have been modifications hereto, that this Agreement is in full force and effect as modified and stating the date and nature of such modifications, (ii) there are no current uncured defaults under this Agreement or specifying the dates and nature of any such default, and (iii) any other information reasonably requested by Developer. City’s failure to deliver such notice within such time period shall constitute a conclusive presumption against City that this Agreement is in full force and effect without modification except as may be represented by the Developer and that there are no uncured defaults in the performance of the Developer, except as may be represented by the Developer. Developer shall have the right at Developer’s sole discretion, to record the Notice of Compliance.

Not Applicable (at this time) There has been no need to exercise this provision of the agreement.

Page 7 ends

11Exported on April 17, 2023 11:08:36 AM PDT
150
DA Section Condition/Requirement Status Comments Action Items 79 Article IX - Cooperation in
the Event of Legal Challenge
80 Section 9.01 Cooperation.
81 (a) Developer agrees to indemnify, defend, and hold harmless the City, its officials, officers, employees, agents and consultants from any and all administrative, legal or equitable actions or other proceedings instituted by any person not a party to this Agreement challenging the validity of the Agreement or any Project Approval or any Subsequent Project Approval, or otherwise arising out of or stemming from this Agreement. Developer may select its own legal counsel to represent Developer’s interests at Developer’s sole cost and expense. The parties shall cooperate in defending such action or proceeding. Developer shall pay for City's costs of defense, whether directly or by timely reimbursement on a monthly basis. Such costs shall include, but not be limited to, all court costs and attorneys' fees expended by City in defense of any such action or other proceeding, plus staff and City Attorney time spent in regard to defense of the action or proceeding.

The parties shall use best efforts to select mutually agreeable defense counsel but, if the parties cannot reach agreement, City may select its own legal counsel and Developer agrees to pay directly or timely reimburse on a monthly basis City for all such court costs, attorney fees, and time referenced herein.

Compliant to date. There has been no need to exercise this provision of the agreement.
82 (b) Developer also agrees to indemnify, defend and hold harmless the City, its officials, officers, employees, agents and consultants from any claims, costs, damages or other liabilities for any personal injury or death, or property damage, resulting from the construction of the Project or of operations by the Developer, its officers, employees, agents or consultants, under this Agreement, except for such claims, costs, damages, or other liabilities which are caused by the sole or gross negligence of the City, its officials, officers, employees, agents, or consultants. Developer may select its own legal counsel to represent Developer’s interests at Developer’s sole cost and expense.

Compliant to date. There has been no need to exercise this provision of the agreement.
83 (c) The parties agree that this Section 9.01 shall constitute a separate agreement entered into concurrently, and that if any other provision of this Agreement, or the Agreement as a whole, is invalidated, rendered null, or set aside by a court of competent jurisdiction, the parties agree to be bound by the terms of this Section 9.01, which shall survive such invalidation, nullification or setting aside.

Compliant to date. There has been no need to exercise this provision of the agreement.
84 Section 9.02 Cure; Reapproval.
85 (a) If, as a result of any administrative, legal or equitable action or other proceeding as described in Section 9.01, all or any portion of this Agreement, Project Approvals, or Subsequent Approvals are set aside or otherwise made ineffective by any judgment (a “Judgment”) in such action or proceeding (based on procedural, substantive or other deficiencies, hereinafter “Deficiencies”), the parties agree to use their respective best efforts to sustain and reenact or readopt this Agreement, Project Approvals, and/or Subsequent Approvals that the Deficiencies relate to, as follows, unless the parties mutually agree in writing to act otherwise:

Compliant to date. There has been no need to exercise this provision of the agreement.
86 (i) If any Judgment requires reconsideration or consideration by City of this Agreement, Project Approval, or Subsequent Approval, then the City shall consider or reconsider that matter in a manner consistent with the intent of this Agreement. If any such Judgment invalidates or otherwise makes ineffective all or any portion of this Agreement or any Project Approval, or Subsequent Approval, then the parties shall cooperate and shall cure any Deficiencies identified in the Judgment or upon which the Judgment is based in a manner consistent with the intent of this Agreement and the Judgment.

Upon the parties cure of such Deficiencies, City shall then take steps consistent with the Judgment necessary readopt or reenact this Agreement and any applicable Project Approval, Subsequent Approval, or any portion thereof.

Compliant to date. There has been no need to exercise this provision of the agreement.
87 (ii) Acting in a manner consistent with the intent of this Agreement or a Judgment includes, but is not limited to, recognizing that the parties intend that Developer may develop a eighty two (82) single- family residential unit project, and adopting such ordinances, resolutions, and other enactments, including but not limited to a general plan amendment, rezoning, vesting subdivision map approvals, development plan approvals, PD Plan approvals, design review, improvement agreements, use permits, grading permits, building permits, lot line adjustments, sewer and water connection permits, certificates of occupancy, final development plans, development agreements, permits, resubdivisions, and any amendments to, or repealing of, any of the foregoing as are necessary to readopt or reenact all or any portion of this Agreement, Project Approvals, and/or Subsequent Approvals without contravening the Judgment.

Compliant to date. There has been no need to exercise this provision of the agreement.
88 (b) The parties agree that this Section 9.02 shall constitute a separate agreement entered into concurrently, and that if any other provision of this Agreement, or the Agreement as a whole, is invalidated, rendered null, or set aside by a court of competent jurisdiction, the parties agree to be bound by the terms of this Section 9.02, which shall survive such invalidation, nullification or setting aside.

Compliant to date. There has been no need to exercise this provision of the agreement.
89 Article X - Default, Remidies,
Termination

Page 8 ends

11Exported on April 17, 2023 11:08:36 AM PDT
151
DA Section Condition/Requirement Status Comments Action Items 90 Section 10.01 Defaults. Any failure by either party to perform any term or provision of this Agreement, which failure continues uncured for a period of thirty (30) days following written notice of such failure from the other party (the “Complaining Party”) (unless such period is extended by mutual written consent), shall constitute a default under this Agreement. The Complaining Party’s notice (“Default Notice”) shall specify the nature of the alleged failure and, may specify the manner in which the failure satisfactorily may be cured By the other party (the “Defaulting Party”). Any failures or delays by a Complaining Party in asserting any of its rights and remedies as to any default shall not operate as a waiver of a default or of any such rights or remedies. Delays by a Complaining Party in asserting any of its rights and remedies shall not deprive the Complaining Party of its right to institute and maintain any actions or proceedings, which it may deem necessary to protect, assert, or enforce any such rights or remedies. If the nature of the alleged failure is such that it cannot reasonably be cured within such 30-day period, then no fault shall be deemed to have occurred if: (a) the cure shall be commenced at the earliest practicable date following receipt of the Default Notice; (b) the cure is diligently prosecuted to completion at all times thereafter; (c) at the earliest practicable date (if no event later than thirty (30) days after the Defaulting Party’s receipt of the Default Notice), the Defaulting Party provides written notice to the Complaining Party that the cure cannot practicably be completed within such 30-day period; and (d) the cure is completed at the earliest practicable date.

In no event shall Complaining Party be precluded from exercising remedies if a default is not cured within one hundred twenty (120) days after the Notice of Default is given. Complaining Party shall not send notice to any third party, including, but not limited to, bonding and surety companies, until such time as the cure opportunities set forth above have expired unless otherwise required by applicable law. Upon the occurrence of a default under this Agreement, the Complaining Party may institute legal proceedings to enforce the terms of this Agreement or, in the event of a material default, terminate this Agreement. If the default is cured consistent with this Section, then no default shall exist and the Complaining Party shall take no further action.

See Comments/Action Items As of December 31, 2022, there has been no need to exercise this provision of the agreement.
91 Section 10.02 Termination. If City elects to consider terminating this Agreement due to a material default of Developer, then City shall give a notice of intent to terminate this Agreement and the matter shall be scheduled for consideration and review by the City Council at a duly noticed and conducted public hearing. As used herein, a finding of materiality shall be based on the effect of the default in relation to the size and scope of the Project. Developer shall have the right to offer written and oral evidence prior to or at the time of said public hearings. If the City Council determines that a material default has occurred and is continuing, and elects to terminate this Agreement, City shall give written notice of termination of this Agreement to Developer by certified mail and this Agreement shall thereby be terminated sixty (60) days thereafter; provided, however, that if Developer files an action to challenge City’s termination of this Agreement within such 60-day period, then this Agreement shall remain in full force and effect until a trial court has affirmed City’s termination of this Agreement and all appeals have been exhausted (or the time for requesting any and all appellate review has expired).

See Comments/Action Items As of December 31, 2022, there has been no need to exercise this provision of the agreement.
92 Section 10.03 Periodic Review.
93 (a) Conducting the Periodic Review. Throughout the Term of this Agreement, at least once every twelve (12) months following the execution of this Agreement, City shall review the extent of good-faith compliance by Developer with the terms of this Agreement. This review (the “Periodic Review”) shall be conducted by the City Manager or his/her designee and shall be limited in scope to compliance with the terms of this Agreement pursuant to California Government Code § 65865.1. Developer also agrees to pay City annually the greater of Five Thousand Dollars ($5,000) or the actual cost of Periodic Review Fee (not to exceed Ten Thousand Dollars ($10,000)). The Five Thousand Dollars ($5,000) shall be increased annually thereafter by the CPI for the San Francisco Oakland Area, with the first increase implemented in January 2017 reflecting 2016 increases. Such Periodic Review Fee shall only be paid in the years in which a Periodic Review is actually conducted.

Compliant to date.
94 (b) Notice. At least ten (10) days prior to the Periodic Review, and in the manner prescribed in Article XII of this Agreement, City shall deposit in the mail to Developer a copy of any staff reports and documents to be used or relied upon in conducting the review and, to the extent practical, related exhibits concerning Developer’s performance hereunder. Developer shall be permitted an opportunity to respond to City’s evaluation of Developer’s performance, either orally at a public hearing or in a written statement, at Developer’s election. Such response shall be made to the City Manager.

See Comments/Action Items Notice of the Annual Review will be given to the Developer on/or before April 21, 2023.
95 (c) Good Faith Compliance. During the Periodic Review, the City Manager shall review Developer’s good-faith compliance with the terms of this Agreement. At the conclusion of the Periodic Review, the City Manager shall make written findings and determinations, on the basis of substantial evidence, as to whether or not Developer has complied in good faith with the terms and conditions of this Agreement. The decision of the City Manager shall be appealable to the City Council. If the City Manager finds and determines that Developer has not complied with such terms and conditions, the City Manager may recommend to the City Council that it terminate or modify this Agreement by giving notice of its intention to do so, in the manner set forth in California Government Code §§ 65867 and 65868. The costs incurred by City in connection with the Periodic Review process described herein shall be shared equally by Developer and City.

Compliant to date.
96 (d) Failure to Properly Conduct Periodic Review. If, after thirty (30) days following Developer’s notice requesting a Periodic Review, City fails to initiate the Periodic Review, such failure shall be conclusively deemed an approval by City of Developer’s compliance with the terms of this Agreement.

Compliant to date.
97 (e) Written Notice of Compliance. With respect to any year for which Developer has been determined or deemed to have complied with this Agreement, City shall, within thirty (30) days following a written request by Developer, provide Developer with a written notice of compliance, in recordable form, duly executed and acknowledged by City. Developer shall have the right, in Developer’s sole discretion, to record such notice of compliance.

Complaint to date. Written Notice of Compliance will be sent to the Developer upon conclusion of the Annual Review.

Page 9 ends

11Exported on April 17, 2023 11:08:36 AM PDT
152
DA Section Condition/Requirement Status Comments Action Items 98 Section 10.04 Excusable Delay; Extension of Time of Performance. In addition to specific provisions of this Agreement, neither party shall be deemed to be in default where delays in performance or failures to perform are due to, and a necessary outcome of, war, insurrection, terrorism, strikes or other labor disturbances, walk-outs, riots, floods, earthquakes, fires, casualties, acts of God, restrictions imposed or mandated by other governmental entities (including new or supplemental environmental regulations), enactment of conflicting State or Federal laws or regulations, or judicial decisions.

Neither party shall be deemed to be in default where delays in performance or failure to perform are due to a court order arising out of or related to litigation attacking the validity of this Agreement, the Project Approvals, the Subsequent Approvals, or any permit, ordinance, entitlement or other action of a governmental agency other than City necessary for the development of the Project. Developer shall not be deemed to be in default where delays in performance or failure to perform are t due to Developer’s inability to obtain materials, power or public facilities (such as water or sewer service) to the Project and unrelated to Developer’s actions or inactions and beyond Developer’s control. Upon the properly noticed request of either party hereto, as required by Section 12.09, an extension of time for the performance of any obligation whose performance has been so prevented or delayed will be set forth in writing. The term of any such extension shall be equal to the period of the excusable delay, or longer, as may be mutually agreed upon in writing.

Compliant to date. As of December 31, 2022, there has been no need to exercise the provisions of Section 10.04.
99 Section 10.05 Legal Action. Either party may, in addition to any other rights or remedies, institute legal action to cure, correct, or remedy any default, enforce any covenant or agreement herein, enjoin any threatened or attempted violation thereof, recover damages for any default, enforce by specific performance the obligations and rights of the parties hereto, or to obtain any remedies consistent with the purpose of this Agreement.

Compliant to date. There has been no need to exercise this provision of the agreement.
100 Section 10.06 California Law. This Agreement shall be construed and enforced in accordance with the laws of the State of California.

Compliant to date.
101
Section 10.07 Resolution of Disputes. With regard to any dispute involving development of the Project, the resolution of which is not provided for by this Agreement or Applicable Law, Developer shall, at City’s request, meet with City. The parties to any such meetings shall attempt in good faith to resolve any such disputes. If the parties are then unable to resolve their dispute, either party may commence mediation by providing to JAMS, or its successor, and the other party a written request for mediation, setting forth the subject of the dispute and the relief requested. The parties will cooperate with JAMS and with one another in selecting a mediator from JAMS’ panel of neutrals, and in scheduling the mediation proceedings. The parties covenant that they will participate in the mediation in good faith, and that they will share equally in its costs. All offers, promises, conduct and statements, whether oral or written, made in the course of the mediation by any of the parties, their agents, employees, experts and attorneys, and by the mediator and any JAMS employees, are confidential, privileged and inadmissible for any purpose, including impeachment, in any litigation or other proceeding involving the parties, provided that evidence that is otherwise admissible or discoverable shall not be rendered inadmissible or non-discoverable as a result of its use in the mediation. Either party may seek equitable relief prior to the mediation to preserve the status quo pending the completion of that process. Except for such an action to obtain equitable relief, neither party may commence a civil action with respect to the matters submitted to mediation until after the completion of the initial mediation session, or ninety (90) days after the date of filing the written request for mediation, whichever occurs first. Mediation may continue after the commencement of a civil action, if the parties both agree in writing. The provisions of this Section 10.07 may be enforced by any Court of competent jurisdiction, and the party seeking enforcement shall be entitled to an award of all costs, fees and expenses, including attorney’s fees, to be paid by the party against whom enforcement is ordered. Nothing in this Section 10.07 shall in any way be interpreted as requiring that Developer and City and/or City’s designee reach agreement with regard to those matters being addressed, nor shall the outcome of these meetings be binding in any way on City or Developer unless expressly agreed to in writing by the parties to such meetings.

Compliant to date. There has been no need to exercise this provision of the agreement.
102
Section 10.08 Attorneys’ Fees. In any legal action or other proceeding brought by either party to enforce or interpret a provision of this Agreement, the prevailing party is entitled to reasonable attorneys’ fees and any related other costs incurred in that proceeding in addition to any other relief to which it is entitled.

Compliant to date. There has been no need to exercise this provision of the agreement.
103 Section 10.09 Default by City or Developer. In the event City or Developer defaults under the terms of this Agreement, City or Developer shall have all rights and remedies provided herein and under law.

Compliant to date. There has been no need to exercise this provision of the agreement.
104
Article XI - No Agency, Joint
Venture or Partnership
105
It is specifically understood and agreed to by and between the parties hereto that unless otherwise expressly provided herein (i) the subject development is a private development; (ii) City have no interest or responsibilities for, or duty to, third parties concerning any improvements until such time, and only until such time, that City accepts the same pursuant to the provisions of this Agreement or in connection with the various Project Approvals or Subsequent Approvals; (iii) Developer shall have full power over and exclusive control of the Project herein described, subject only to the limitations and obligations of Developer under this Agreement, the Project Approvals, Subsequent Approvals, and Applicable Law; and (iv) City and Developer hereby renounce the existence of any form of agency relationship, joint venture or partnership between City and Developer and agree that nothing contained herein or in any document executed in connection herewith shall be construed as creating any such relationship between City and Developer. The City agrees that Developer’s obligations under this Agreement related to the construction of Project water, sewer and drainage infrastructure improvements, the grading and construction of traffic improvements, and the grading and construction of any other public improvements (collectively, the “Public Improvements”) are all public works of improvement the City is requiring as a condition of regulatory approval of the Project and that the Project is an otherwise private development. The City further agrees that it will contribute no more money, or the equivalent of money, to the overall Project than is required to construct the Public Improvements and that City maintain no proprietary interest in the overall Project.

Compliant to date.
106
Article XII - Miscellaneous
107
Section 12.01 Incorporation of Recitals and Introductory Paragraph. The Recitals contained in this Agreement, and the introductory paragraph preceding the Recitals, are hereby incorporated into this Agreement as if fully set forth herein.

Not Applicable

Page 10 ends

11Exported on April 17, 2023 11:08:36 AM PDT
153
DA Section Condition/Requirement Status Comments Action Items 108
Section 12.02 Enforceability. City and Developer agree that unless this Agreement is amended or terminated pursuant to the provisions of this Agreement, this Agreement shall be enforceable by any party hereto notwithstanding any change hereafter enacted or adopted (whether by ordinance, resolution, initiative, or any other means) in any applicable general plan, specific plan, zoning ordinance, subdivision ordinance, or any other land use ordinance or building ordinance, resolution or other rule, regulation or policy adopted by City that changes, alters or amends the rules, regulations and policies applicable to the development of the Project Site at the time of the approval of this Agreement as provided by California Government Code § 65866. In the event of any conflict between the provisions of this Agreement and Applicable Law, the Project Approvals or any Subsequent Approval, this Agreement shall prevail.

Not Applicable
109
Section 12.03 Findings. City hereby finds and determines that execution of this Agreement furthers public health, safety and general welfare and that the provisions of this Agreement are consistent with the General Plan.

Not Applicable
110
Section 12.04 Severability. If any term or provision of this Agreement, or the application of any term or provision of this Agreement to a particular situation, is held by a court of competent jurisdiction to be invalid, void or unenforceable, the remaining terms and provisions of this Agreement, or the application of this Agreement to other situations, shall continue in full force and effect unless amended or modified by mutual consent of the parties. Notwithstanding the foregoing, if any material provision of this Agreement, or the application of such provision to a particular situation, is held to be invalid, void or unenforceable, either City or Developer may (in their sole and absolute discretion) terminate this Agreement by providing written notice of such termination to the other party.

Not Applicable
111
Section 12.05 Other Necessary Acts. Each party shall execute and deliver to the other all such other further instruments and documents as may be reasonably necessary to carry out the Project Approvals, Subsequent Approvals and this Agreement and to provide and secure to the other party the full and complete enjoyment of its rights and privileges hereunder.

Not Applicable
112
Section 12.06 Construction. Each reference in this Agreement to this Agreement or any of the Project Approvals or Subsequent Approvals shall be deemed to refer to the Agreement, Project Approval or Subsequent Approval as it may be amended from time to time, whether or not the particular reference refers to such possible amendment. This Agreement has been reviewed and revised by legal counsel for both City and Developer, and no presumption or rule that ambiguities shall be construed against the drafting party shall apply to the interpretation or enforcement of this Agreement.

Not Applicable
113
Section 12.07 Other Miscellaneous Terms. The singular shall include the plural; the masculine gender shall include the feminine; “shall” is mandatory; “may” is permissive. If there is more than one signer of this Agreement, the signer obligations are joint and several.

Not Applicable
114
Section 12.08 Covenants Running with the Land. All of the provisions contained in this Agreement shall be binding upon the parties and their respective heirs, successors and assigns, representatives, lessees, and all other persons acquiring all or a portion of the Project, or any interest therein, whether by operation of law or in any manner whatsoever. All of the provisions contained in this Agreement shall be enforceable as equitable servitudes and shall constitute covenants running with the land pursuant to California law including, without limitation, California Civil Code § 1468. Each covenant herein to act or refrain from acting is for the benefit of or a burden upon the Project, as appropriate, runs with the Project Site and is binding upon the owner of all or a portion of the Project Site and each successive owner during its ownership of such property.

Not Applicable
115
Section 12.09 Notices. Any notice or communication required hereunder between City or Developer must be in writing, and may be given either personally, by fax (with original forwarded by regular U.S. Mail) by registered or certified mail (return receipt requested), or by Federal Express or other similar courier promising overnight delivery. If personally delivered, a notice shall be deemed to have been given when delivered to the party to whom it is addressed. If given by facsimile transmission, a notice or communication shall be deemed to have been given and received upon actual physical receipt of the entire document by the receiving party’s facsimile machine. Notices transmitted by facsimile after 5:00 p.m. on a normal business day or on a Saturday, Sunday or holiday shall be deemed to have been given and received on the next normal business day. If given by registered or certified mail, such notice or communication shall be deemed to have been given and received on the first to occur of (i) actual receipt by any of the addressees designated below as the party to whom notices are to be sent, or (ii) five (5) days after a registered or certified letter containing such notice, properly addressed, with postage prepaid, is deposited in the United States mail. If given by Federal Express or similar courier, a notice or communication shall be deemed to have been given and received on the date delivered as shown on a receipt issued by the courier. Any party hereto may at any time, by giving ten (10) days written notice to the other party hereto, designate any other address in substitution of the address to which such notice or communication shall be given. Such notices or communications shall be given to the parties at their addresses set forth below...

Not Applicable
116
Section 12.10 Entire Agreement, Counterparts and Exhibits. This Agreement is executed in two (2) duplicate counterparts, each of which is deemed to be an original. This Agreement consists of 27 pages and four exhibits which constitute in full, the final and exclusive understanding and agreement of the parties and supersedes all negotiations or previous agreements of the parties with respect to all or any part of the subject matter hereof. All waivers of any provisions of this Agreement shall be in writing and signed by the appropriate authorities of City and Developer. The following exhibits are attached to this Agreement and incorporated herein for all purposes:

Not Applicable
117 EXHIBIT A Legal Description Not Applicable
118 EXHIBIT A-1 Project Site Diagram Not Applicable
119 EXHIBIT B Applicable Fees Not Applicable
120 EXHIBIT C Affordable Housing Agreement Not Applicable 121
Section 12.11 Recordation of Development Agreement. Pursuant to California Government Code § 65868.5, no later than ten (10) days after City enters into this Agreement, the City Clerk shall record an executed copy of this Agreement, or Memorandum thereof, in the Official Records of the County of Contra Costa. The parties agree to cooperate as to preparation, execution, and recording of a Memorandum hereof.

See Comments/Action Items The DA was recorded at the Contra Costa County Clerk-Recorder on August 30, 2016 (DOC 2017-
0176165)

Page 11 ends

11Exported on April 17, 2023 11:08:36 AM PDT
154
Resolution No. 23- 1 May 1, 2023

BEFORE THE CITY COUNCIL OF THE CITY OF PITTSBURG

In the Matter of:

Periodic Review of the Sky Ranch II )
Development Agreement and ) RESOLUTION NO. 23-
Determination as to Compliance )
With Development Agreement )

The Pittsburg City Council DOES RESOLVE as follows:

WHEREAS, a Development Agreement between the C ity of Pittsburg and SkyRanch Land Investors, LLC , was executed on July 21, 2017, for the Sky Ranch II Property; and

WHEREAS, California Government Code Section 65864 et seq. (“ Development Agreement Statutes”) authorizes and regulates the execution of development agreements (“DAs") between certain public entities and persons who desire to develop private property within a public entity’s jurisdiction; and

WHEREAS, pursuant to the D evelopment Agreement Statutes, the City established procedures for the consideration of DA applications by property owners or other persons having an interest in property within City’s jurisdiction; and

WHEREAS, Section 65865.1 requires City to conduct a periodic review of the City’s active Development Agreements, at which time each respective developer is required to demonstrate good faith compliance with the terms of the Development Agreement (“Periodic Review”); and

WHEREAS, if, as a result of the Periodic Review, the City finds and determines, on the basis of substantial evidence, that a developer has not complied in good faith with the terms and conditions of the Development Agreement, the City may terminate or modify the DA pursuant to the Development Agreement Statutes; and

WHEREAS, the last periodic review of the Sky Ranch II Development Agreement was conducted, and on December 21, 2020, the City Council determined that the developer was in compliance with the terms of the Development Agreement.

NOW, THEREFORE, the City Council finds and determines as follows:

Section 1. Recitals

The City Council hereby finds and determines that the above recitals are true and correct and have served as the basis, in part, for the findings and acti ons of t he City Council set forth below.

155
Resolution No. 23- 2 May 1, 2023

Section 2. Compliance with Development Agreement

The City Council hereby finds and determines that , based on the information provided by the Developer and City Staff, as well as the information contained in the "Sky Ranch II DA – 2022 Annual Review", attached hereto and incorporated herein by reference as "Exhibit 1, ” the Developer has demonstrated good faith compliance with the Sky Ranch II Development Agreement.

Section 3. Certificate of Compliance

The City Council hereby directs and authorizes the City Manager to issue a certificate codifying the " Finding of Compliance" for Sky Ranch II in a form that can be recorded by the Developer.

Section 4. Certification

The City Clerk shall certify the adoption of this Resolution.

Section 5. Effective Date

This Resolution shall take effect immediately upon adoption.

PASSED AND ADOPTED by the City Council of the City of Pittsburg at a regular meeting on the 1st day of May, 2023, by the following vote:

AYES:

NOES:

ABSTAINED:

ABSENT:

_____________________________
Shanelle Scales-Preston, Mayor

ATTEST:

______________________________
Alice E. Evenson, City Clerk

156
Exhibit -1 Sky Ranch DA - 2022 Annual Review Summary Table Primary Column Column2 Status Notes Action Items?
1 Article II: Effective Date; Term
2 2.01 Effective Date. This Agreement shall become effective upon the date the ordinance approving this Agreement becomes effective (the "Effective Date").

See Comments/Action
Items
Ordinance No. 17-1431 approving the DA
was adopted on June 5, 2017, with an
effective date of July 21, 2017
3 2.02 Term. The term of this agreement shall commence upon the date the ordinance approving this agreement and continue for a period of twenty (20) years (the "Term") See Comments/Action
Items
Based on the effective date of July 21,
2017, the DA will expire on July 21, 2037
4 Article III: Obligations of Developer
5 3.01 Drainage Improvements. Subject to the terms of this Agreement, as a condition of approval to one or more of the Project Approvals, Developer agrees to construct and offer dedication to the City those Project storm water drainage improvements to be located within City's boundaries and required to serve the Project Site ("Drainage Improvements"). The City shall accept the offer of dedication of the Drainage Improvements, as long as the Drainage Improvements comply with the City's standards, applicable rules and regulations, and this Agreement. The parties agree that the construction of the Drainage Improvements shall be phased according to a construction schedule determined by Developer, subject to the written approval of the City Manager.

City shall not require any improvements to onsite or offsite drainage facilities to address pre-existing deficiencies provided that Developer demonstrates to City's reasonable satisfaction that impact to downstream facilities are not being exacerbated.

See Comments/Action
Items
As of December 31, 2022, the Developer
has not submitted applications for
engineering or building permits for the
project. The City shall seek performance of
Developer's obligations prior to or as part
of project development.
6 3.02 Facility Reserve Charges. Developer agrees to pay City's Facility Reserve Charges ("FRC" as set or modified by the City Council from time to time.

Not Applicable (at this
time)
7 3.03 Water Infrastructure. (1) Developer shall comply with the 2016 Water System Master Plan, as amended. Developer shall have the option subject to the written approval by the City Manager to provide water infrastructure facilities in phases subject to a storage requirement pursuant to the 2016 Water System Master Plan, as amended. (2) Developer shall have the right to obtain a certain number of building permits for homes on lots which are in the Zone II water service, even if the new Zone II water reservoir and appurtenant improvements have not yet been constructed at such time. [financing information...] (3) Developer shall design and construct a Zone IV water reservoir and all appurtenant improvements relating to the reservoir on the 1.23 acre parcel in accordance with the most current Water Master Plan. [financing information...] (4) The City's 2016 Water Master Plan requires the Segment 1E pipeline to be constructed prior to the issuance of the 807th equivalent single family dwelling unit in the Zone II infill and SE Hills service areas. The pipeline segment shall be designed, constructed, and managed by the City in accordance with the most current Water Master Plan. [payment....] Not Applicable (at this
time)
8 3.04 School Facilities Impact Mitigation. Developer shall pay in lieu school impact fees in accordance with Government Code 65995 et seq. Compliance with this Section shall satisfy all of Developer's obligations required by City to mitigate school impacts resulting from the Project.

Not Applicable (at this
time)
9 3.05 Applicable Fees. City may levy development fees, and charges during the term of this Agreement relative to the development of the Project Site which are in force and effect as of the Effective Date, as more particularly described and according to the payment schedule set forth on Exhibit B "Applicable Fees". Unless otherwise provided in this Agreement, no development fees or charges or categories shall be imposed on the project other than those fees. All fees related to third-party government agencies that are paid directly to third-party government agencies are not within the scope of this Agreement.

Not Applicable (at this
time)
10 3.06 Applicable Fee Adjustments. Developer shall pay fees consistent with Section 3.05 and the applicable adjustments currently provided in such fees, and as modified from time to time by the City, whether such adjustment or modification is an increase or decrease.

Developer retains the right to challenge the imposition of any new fees not referenced in this Agreement or the modification, amendment or adjustment of all Applicable Fees pursuant to Government Code 66000 et seq., not already authorized by ordinances, resolutions, or policies in place at the time of the Agreement's execution. Should the City Council approve a new AB 1600 fee study and/or authorize a decrease in any Applicable Fees during the term of this Agreement by ordinance or by resolution, Developer shall have the option, at its sole discretion, to pay the lower free, as may be adjusted by the applicable CPI or ENR, unless otherwise bound by separate contract or memorandum of understanding with City. In no event shall Developer receive retroactive adjustments for lower fees.

Not Applicable (at this
time)
11 3.07 City Local Traffic Mitigation Fee. Developer shall pay the City Local Traffic Mitigation Fee, in the amount in effect as of the Effective Date and subject to adjustments in accordance with Resolution No. 07-10917 with credit for certain improvements constructed by Developer per Section 4.04 below. If the City Council approved a new AB 1600 fee study and/or authorizes a decrease in any of the applicable fees during the term of this Agreement by ordinance or resolution, Developer shall have the option at its sole discretion to pay the lower fee, as may be adjusted by the applicable CPI or ENR, unless otherwise bound by separate contract or memorandum of understanding with City. In no event shall Developer receive retroactive adjustments for lower fees. Developer agrees that City may use the Local Traffic Mitigation Fee paid by Developer pursuant to this Section for the City's share of the James Donlon Expressway. This use by the City shall not decrease or otherwise modify Developer's other obligations under this Agreement, including/not limited to Section 3.13.

Not Applicable (at this
time)