DEPUTY CITY ADMINISTRATOR / PUBLIC SERVICES AND INFRASTRUCTURE FEBRUARY 1, 2022
SUBJECT: CONTRACT CHANGE ORDER NO. 2 FOR FISCAL YEAR 2021-22 SLURRY SEAL PROJECT, PROJECT NO. 1202
FISCAL
IMPACT. EXPENSE: $568,281.29 CONSTRUCTION CONTRACT AMOUNT $ 42,609.00 CHANGE ORDER NO.1
$ 74,152.30 CHANGE ORDER NO.2
$685,042.59 TOTAL CONTRACT AMOUNT WITH CHANGE ORDERS
BUDGET: $750.000.00 FY 2021-22 CIP PROJECT BUDGET
$250,000.00 MEASURE U (791202-6740)
$500,000.00 MEASURE M (181202-6740)
SUMMARY:
A Contract Change Order for the 2021-22 Residential Slurry Seal Project covering several unforeseen conditions and extra work is presented to the City Council for its consideration. Doug Martin Contracting Company, Inc. ("Doug Martin"), has been contracted by the City to construct the above-mentioned project. The original scope of work includes sealing approximately 1.66 million square feet of residential streets using a rubberized slurry pavement sealant in addition to removing and replacing approximately 1,000 square feet of damaged pavement, replacement of approximately 5,587 square feet of damaged sidewalk panels, replacement of damaged concrete curb and gutters, and replacement of all pavements striping and legends.
During construction several unforeseen conditions were found that were not included as part of the original scope of work. In addition, these change orders represent additional quantities of curb/gutter replacement and sidewalks due to excessive root intrusions found during construction.
Staff recommends approval for Change Order No. 2, in the amount of $74,152.30. Change Order No. 1 in the amount of $42,609.00 was authorized by the City Administrator since it was under his contract limit authority.
RECOMMENDATION:
It is recommended that City Council take the following action:
Authorize the City Administrator to approve Contract Change Order No 2 with Doug Martin Contracting Company, Inc. in the amount of $42,609.00.
1. d.
Feb. 1, 2022
City Council Agenda
February 1, 2022
DISCUSSION:
On October 5, 2021, the City Council awarded a Construction Contract to Doug Martin for the Fiscal Year ("FY") 2021-22 Slurry Seal Project ("Project") in the amount of $568,281.29. In addition, the City Council authorized the City Administrator to approve contract change orders for this project up to 10%, or $56,828.13. The scope of work for the Project entails the placement of approximately 1.66 million square feet of rubberized slurry sealant upon residential roadways in addition to removing and replacing approximately 1,000 square feet of damaged pavement, replacement of approximately 5,587 square feet of damaged sidewalk panels, replacement of damaged concrete curb and gutters, and replacement of all pavements striping and legends.
Change Order No.1 in the amount of $42,609.00 was authorized by the City Administrator since it was under his contract limit authority. Change Order No. 1 covered the cost for removal of 10 large tree roots that were discovered during the sidewalk replacements for the project. These Targe tree roots were very deep and were not anticipated during the design and bidding of the project. In addition, Change Order No.1 included milling and capping of 2,400 square feet of asphalt concrete pavement, where a sinkhole was discovered at the intersection of Bradford and Madison. This sinkhole was discovered after a severely rusted storm drain corrugated metal pipe collapsed under the heavy weight and vibrations caused by the steam rollers passing over the underground pipe.
Contract Change Order No. 2 is presented for Council consideration and approval and includes milling and capping of 5,655 square feet of existing roadway sections. The original bid included 1,000 square feet of full section pavement replacement; however, during construction it was determined that a 2 inch grind and overlay was a far better application to rehabilitate damaged sections of roadway area in lieu of a 1,000 square feet of full section pavement replacement. In addition, the contractor agreed to do this work utilizing the original bid pricing, which will be less expensive on a per square foot basis than the full section pavement replacement. Additional extraordinary repairs are included in Contract Change Order No. 2 which entails pavement restoration at the intersection of Madison and Bradford where a sinkhole developed due to a collapsed storm drain line and subsequent repair
FISCAL IMPACT:
The cost for Contract Change Order No. 2 amounts $74,152.30. The revised total construction contract amount is $685,042.59 and the total budget for this project amounts to $750,000. As such, sufficient funds exist for the recommended action.
Prepared by:
Masoud S
City Engi
er
Reviewed and approved:
en E .••son
Interim Director of Finance
City Council Agenda
February 1, 2022
401,4-*
4.4 Luis Estevez Damen R.-Arrula ��
ved: Reviewed and approved:
_.r
Deputy City Administrator
Attachment:
Contract Change Order No. 2
City Administrator